23632 HIGHWAY 99.PDF11111111111111
11549
23632 HIGHWAY 99
F�<OM GRAMOR (206)672-0622
8.21.1990 8:21
ORRHOR DEUELOPMENT, INC.
4211 200th S,W. #202
LynnLV00d, WR 98036
(206) 774-ooge
(206) 672-0622 FRH
To: T-T— rAH -z-sa - S4"71
a ate; 1 1610 sent By:
# Of Pages Including this sheet:
Remarks:
(#24).
60-4 -S�,
AP PV-c.,,JA.L— RV YA I
p . 1
2
j 2
1,4 6
ot-4-n4s 'Dv� M44p, ;?,Po&j-
A k- ,
�2 6,0w
1?a -r\4
7.1
Ps
RAPID LETTER
FROM
TO
SUBJECT
5.
DATE
�0 /Ai- az;4�eaJ
REPLY DATE
SIGNED
TOPS NO. 3701
LITHO - USA RECIPIENT: REPLY ON PINK COPY — RETAIN WHITE COPY
DATE:
TECHNICAL REVIEW STAFF: MAy 01? &VI o
Project C has been scheduled for
�/o
Review. Such review should be'completed and comments and/or
approvals returned to MARY PETRO by
Monica McLaughlin
C-9
'P IC,�02-
..
�l fax M.
b�s
io -� A-aw tq
TO
BuojE,CT
Z.
RE Ck E' -D
jV11) I*-? 119SO
CLERICAL
COMMUNITY DEVELOPMENT
r- DATE 9,0
MESSAGE
4.� W,:�, /eve
%&Aoo,
SIGNED
ops 9 FORM3801 LITHOINUSA RECIPIENT: REPLY ON PINK COPY — RETAIN WHITE COPY --
0" 0
ADDRESS:
1-.1
TAX ACCOUNT/PARCEL NUMBER:
BUILDING PERMIT (NEW STRUCTURE):
COVENANTS (RECORDED) FOR:
CRITICAL AREAS: DETERMINATION: E] Conditional Waiver E] Study Required E] Waiver
DISCRETIONARY PERMIT #IS: AQB 1999-115, AQB 1999-147, SD 2001-102, ADB 2002-47, ADB 2002-202
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
PERMITS (OTHER): 19960606(tnnt imp) 199607S7(sign) 19970434(sign) 19970660(sign) 19980270(sign)
19980387(sign) 19980420(mech) 19980515(sign) 19990123(alt int) 19990127(demo int) 19990130(fire
sprnkir) 19990153(mech) 19990154(alt int) 19960185(mech) JL9990332(alt int) 19990333(alt int)
19990365(mech) 19990388(sign) 19990414(l!lumb) 19990419(sign) 19990447(mech) 19990546(tnnt imp)
19990629(sign) 19990756(fire sup)20000065(tnnt imp)20000069(sign)20000346(sign)20000403(aI
int)2000043S(mech)20010466(mech)20010601(tnnt imp)20010674(fire sRrnkir)20010825(sign)
20020030(demo int)20020049(mech)20020105(mech)20020106(tnnt imR) 20 20107(plumb)20020114ILire
alarm)20020116(fire sRrnkir)20020200(sign)20020967(sign)20020969(sign)20030134(sign)
20030388(sign)20040102(tnnt imp)20040127(fire sRrnkir)20040188(sign)20040257(plumb)20050691(demo
int)20050734 tnnt imp)20050753(alt int)20050754((pavinq)20050772(plumb)20050777(plumb)
20050816(sign)20050834(fire sprnklr)20050837(fire supp)20050890(sign)20050929(sign)
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
�t±
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION-236th Street/SR-104
AREA TYPE ..... OTHER
ANALYST ....... ZMM
DATE .......... 09/06/89
TIME .......... 4:45-5:45 PM PEAK
COMMENT ....... Future 1990 without project + 3% annual Growth Rate
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 20 25 85 35 LTR 12.0 LTR 12.0 L 12.0 L 12.0
TH 70 25 1235 780 12.0 12.0 T 12.0 T 12.0
RT 35 30 20 50 12.0 12.0 TR 12.0 TR 12.0
RR 5 4 3 7 12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
M M YIN Nm Nb YIN min T
EB 2.00 0.00 N 0 0 0.90 5 Y 25.8 3
WB -3.00 1.00 N 0 0 0.90 5 Y .25.8 3
NB 0.00 1.00 N 0 0 0.90 5 Y 13.8 3
SB 0.00 2.00 N 0 0 0.90 5 N 13.8 3
--------------------------------------------------------------------------
. SIGNAL SETTINGS CYCLE LENGTH 60.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 PH-4
EB LT x NB LT, x
TH x TH x
RT x RT x
PD x PD x
WB LT x SB LT x
TH x TH x
RT x RT x
PD x PD x
GREEN 10.0 0.0 0.0 0.0 GREEN 44.0 0.0 0.0 0.0
YELLOW 3.0 0.0 0.0 0.0 YELLOW 3.0 0.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. VIC G/C DELAY LOS APP. DELAY APP. LOS
EB LTR 0.517 0.167 16.0 C 16.0 C
WB LTR 0.329 0.167 14.5 B 14.5 B
NB -L 0.220 0.733 2.0 A 2.5 A
TR 0.557 0.733 2.5 A
8B L 0.315 0.733 2.6 A 2.0 A
TR 0.370 0.733 1.9 A
--------------------------------------------------------------------------
INTERSECTION: Delay = 3.3 (sec/veh) VIC = 0.550 LOS = A
C-7 ) I f I L� V--� ev.-A lv�
1985 HCM: SIGNALIZED INTERSECTIONS
SUMMARY REPORT
INTERSECTION-236th Street/SR-104
AREA TYPE ..... OTHER
ANALYST ....... ZMM
DATE .......... 09/06/89
TIME .......... 4:45-5:45 PM PEAK
COMMENT ....... Future 1990 with project + 3% Annual Growth rate
--------------------------------------------------------------------------
VOLUMES GEOMETRY
EB WB NB SB EB WB NB SB
LT 20 25 85 42 LTR 12.0 LTR 12.0 L 12.0 L 12.0
TH 79 34 1247 790 12.0 12.0 T 12.0 T 12.0
RT 35 37 20 50 12.0 12.0 TR 12.0 TR 12.0
RR 5 4 3 7 12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.0
12.0 12.0 12.0 12.-0
--------------------------------------------------------------------------
ADJUSTMENT FACTORS
GRADE HV ADJ PKG BUSES PHF PEDS PED. BUT. ARR. TYPE
M M Y/N Nm Nb Y/N min T
EB 2.00 0.00 N 0 0 0.90 5 Y 25.8 3
WB -3.00 1.00 N 0 0 0.90 5 Y -25.8 3
NB 0.00 1.00 N 0 0 0.90 5 Y 13.8 3
SB 0.00 2.00 N 0 0 0.90 5 N 13.8 3
--------------------------------------------------------------------------
SIGNAL SETTINGS CYCLE LENGTH 60.0
PH-1 PH-2 PH-3 PH-4 PH-1 PH-2 PH-3 -PH-4
EB LT x NB LT x
TH x TH x
RT x RT x
PD x PD x
WB LT x SB LT x
TH x TH x
RT x RT x
PD x PD x
GREEN 10.0 0.0 0.0 0.0 GREEN 44.0 0.0 0.0 0.0
YELLOW 3.0 0.0 0.0 0.0 YELLOW 3.0 0.0 0.0 0.0
--------------------------------------------------------------------------
LEVEL OF SERVICE
LANE GRP. V/C G/C DELAY LOS APP. DELAY APP. LOS
EB LTR 0.554 0.167 16.5 C 16.5 C
WB LTR 0.398 0.167 14.9 B 14.9 B
NB L 0.224 0.733 2.0 A 2.5 A
TR 0.563 0.733 2.5 A
SB L 0.391 0.733 3.4 A 2.0 A
TR 0.375 0.733 1.9 A
----------------------------------------------------------------- ----------
INTERSECTION: Delay 3.5 (sec/veh) V/C = 0.561 LOS.= A
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 45
PEAK HOUR FACTOR .................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 236th Street
NAME OF THE NORTH/SOUTH STREET ................... SR-99
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. 5:00-6:00 PM PEAK
OTHER INFORMATION: Existing Tuesday 08/29/89
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB
SB
---- ---- ----
LEFT 3 27 42
----
19
THRU 2 4 1668
1026
RIGHT 24 17 21
30
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 2 2
LANE USAGE LTR LTR*
ADJUSTMENT FACTORS Page-2
---------------------------------------------------------------------
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
-------
-4.00
----------
90
----------------
20
-----------------
N
WESTBOUND
4.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0. 00
90
20
N
VEHICLE COMPOSITION
---------------------------------------------------------------------
% SU TRUCKS
% COMBINATION,
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
0
-------------
0
-------------
0 -
WESTBOUND
0
4
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
2
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 6.10
6.10
0.00
6.10
EB 6.10
6.10
0.00
6.10
MAJOR LEFTS
SB
5.80.
5.80
0.00
5.80
NB
5.80
5.80
0.00
5.80
MINOR THROUGHS
WB
7.40
7.40
0.00
7.40
EB
7.40
7.40
0.00
7.40
MINOR LEFTS
WB
7.90
7.90
0.00
7.90
EB
7.90
7.90
0.00
7.90
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
43
45
34
>
34
>
-9 >
F
THROUGH
6
60
47
>
52 47
>
-24 41 >F
E
RIGHT
27
344
344
>
344
>
317 >
B
MINOR STREET
EB LEFT
2
45
31
>
31
>
>
E
THROUGH
2
60
47
>
158 47
>
135 45 >D
E
RIGHT
19
530
530
>
530
->
511 >
A
MAJOR STREET
NB LEFT
42
252
252
252
209
C
SB LEFT
19
115
115
115
�6
E
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------- 7 ----------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 45
PEAK HOUR FACTOR .................................. I
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 236th Street
NAME OF THE NORTH/SOUTH STREET ................... SR-99
NAME OF THE ANALYST ............................... ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. 5:00-6:00 PM PEAK
OTHER INFORMATION: Future 1990 without project + 3% GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB
SB
LEFT 5 30 45
20
THRU 5 5 1720
1055
RIGHT 25 20 25
35
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 2 2
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
-4.00
----------
90
----------------
20
-----------------
N
WESTBOUND
4.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
EASTBOUND
-----------
0
-------------
0
-------------
0
WESTBOUND
0
4
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
2
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 6.10
6.10
0.00
6.10
EB 6.10
6.10
0.00
6.10
MAJOR LEFTS
SB
5.80'
5.80
0.00
5.80
NB
5.80
5.80
0.00
5.80
MINOR THROGGHS
WB
7.40
7.40
0.00
7.40
EB
7.40
7.40
0.00
7.40
MINOR LEFTS
WB
7.90
7.90
0.00
7.90
EB
7.90
7.90
0.00'
7.90
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
48
45
THROUGH
8
60
RIGHT
32
331
MINOR STREET
EB LEFT
4
45
THROUGH
4
60
RIGHT
20
519
MAJOR STREET
NB LEFT
45
241
SB LEFT
20
115
32
46
331
30
46
519
241
115
> 32 > -15 > F
> 50 46 > -37 38 >F E
> 331 > 299 > C
> 30 >
> 107 46 >
> 519 >
241
115
26 "> E
79 -4 2 > E E
499 >'A.
195 D
95 E
(f) 11, f 0 "//
1985 HCM: UNSIGNALIZED INTERSECTIONS Page -I
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 45
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 236th Street
NAME OF THE NORTH/SOUTH STREET ................... SR-99
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. 5:00-6:00 PM PEAK
OTHER INFORMATION: Future 1990 with project + 3% GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 5 39 45 20
THRU 5 5 1748 10-81
RIGHT 25 20 34 35
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB St
------- ------- ------- -------
LANES 1 1 2 2
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (it)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
-------
-4.00
----------
90
----------------
20
-----------------
N
WESTBOUND
4.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
EASTBOUND
-----------
0
-------------
0
-------------
0
WESTBOUND
0
4
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
2
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 6.10
6.10
0.00
6.10
EB 6.10
6.10
0.00
6.10
MAJOR LEFTS
SB
5.80-
5.80
0.00
5.80
NB
5.80
5.80
0.00
5.80
MINOR THROUGHS
WB
7.40
7.40
0.00
7.40
EB
7.40
7.40
0.00
7.40
MINOR LEFTS
WB
7.90
7.90
0.00
7.90
EB
7.90
7.90
0.00
7.90
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB
LEFT
62
45
32
>
32
>
- 3 0 >
J,
THROUGH
8
60
45
>
46 45
>
-55 _36 >F
E
RIGHT
32
322
322
>
322
>
290 >
C
MINOR
STREET
EB
LEFT
4
45
29
>
.29
>
25
F
THROUGH
4
60
45
>
106 45
>
78 41 >E
E
RIGHT
20
509
509
>
509
->
489 >
A
MAJOR
STREET
NB
LEFT
45
232
232
232
187
D
SB
LEFT
20
115
115
115
95
E
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 35
PEAK HOUR FACTOR, ................................ I
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 236TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... 84TH AVENUE W
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: Existing Conditions
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION.TYPE: 4-LEG
MAJOR STREET DIRECTION: NORT.H/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 30 5 5 15
THRU 50 45 230 90
RIGHT 15 25 5 25
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 1 1 1
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
-ANGLE
----------
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
0.00
90
----------------
20
-----------------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
0
-------------
1
-------------
0
WESTBOUND
0
0
NORTHBOUND
0
0
SOUTHBOUND
0
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 5.70
5.70
0.00
5.70
EB 5.70
5.70
0.00
5..70
MAJOR LEFTS
SB
5.10
5.10
0.00
5.10
NB
5.10
5.10
0.00
5.10
MINOR THROUGHS
WB
6.30
6.30
0.00
6.30
EB
6.30
6.30
0.00
6.30
MINOR LEFTS
WB
6.80
6.80
0.00
6.80
EB
6.80
6.80
0.00
6.80
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph). c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
THROUGH
RIGHT
MINOR STREET
EB LEFT
THROUGH
RIGHT
MAJOR STREET
NB LEFT
SB LEFT
5 479
45 584
25 858
30
482
51
592
15
992
5
998
15
952
445
>
445
>
439
> A
577
>
634 577
>
558 532
>A A
858
>
858
>
832
> A
446
584
992
998
952
> 446 > -41-6 > _&
> 566 584 > 470 534 >A A
> 992 >- 977 > A
998
952
993
937
A
A
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 35
PEAK HOUR FACTOR .................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ...................... 236TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... 84TH AVENUE W
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: Future 1990 without project + 3% GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 35 5 5 15
THRU 55 50 235 95
RIGHT 15 30 5 25
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
0.00
----------
90
----------------
20
-----------------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
0
-------------
1
-------------
0
WESTBOUND
0
0
NORTHBOUND
0
0
SOUTHBOUND
.0
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)*
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 5.70
5.70
0.00
5.70
EB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.10
5.10
0.00
5.10
NB
5.10
5.10
0.00
5.10
MINOR THROUGHS
WB
6.30
6.30
0.00
6.30
EB
6.30
6.30
0.00
.6.30
MINOR LEFTS
WB
6.80
6.80
0.00
6.80
EB
6.80
6.80
0.00
6.80
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB
LEFT
5
469
433
>
433
>
428
>
A
THROUGH
51
577
570
>
632 570
>
546 519
>A
A
RIGHT
30
853
853
>
853
>
822
>
A
MINOR
STREET
EB
LEFT
35
469
430
>
430
>
aU
>
B
THROUGH
56
584
577
>
547 577
>
441 521
>A
—A
RIGHT
15
987
987
>
987
X
972
>
A
MAJOR
STREET
NB
LEFT
5
997
997
997
992
A
SB
LEFT
15
947
947
947
932
A
ll�o "J/
ral
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 35
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 236TH STREET SW
NAME OF THE NORTH/SOUTH'STREET ................... 84TH AVENUE W
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: Future 1990 with project + 3% GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB
WB NB SB
----
LEFT 35
---- ---- ----
5 5 15
THRU 71
66 263 121
RIGHT 15
30 5 25
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 1 1
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
-------
0.00
----------
90
----------------
20
-----------------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES % MOTORCYCLES
----------- ------------- -------------
EASTBOUND 0 0
WESTBOUND 0 0
NORTHBOUND 0 0
SOUTHBOUND 0 0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RI'GHTS
--------
-----------
------------
WB 5.70
5.70
0.00
5.70
EB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.10
5.10
0.00
5.10
NB
5.10
5.10
0.00
5.10
MINOR THROUGHS
WB
6.30
6.30
0.00
6.30
EB
6.30
6.30
0.00
MINOR LEFTS
WB
6.80
6.80
0.00
6.80
EB
6.80
6.80
0.00
6.80
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB
LEFT
5
424
379
>
379
>
374
>
B
THROUGH
67
539
532
>
581 532
>
479 465
>A
A
RIGHT
30
825
825
>
825
>
794
>
A
MINOR
STREET
EB
LEFT
35
424
377
>
377
>
-341
>
B
THROUGH
72
545
538
>
503 538
>
381 467
>B
A
RIGHT
15
960
960
>
960
>-
945
>
A
MAJOR
STREET
NB
LEFT
5
993
993
993
988
A
SB
LEFT
15
920
920
920
905
A
---------------------------------------------------------------------------------------------------------------------------------------
Intersection
'Prepared
228th Street 0 84th
i
Designed by: Zaher Mekkaoui 11
by
'Checked by
'Date
UK
TLG
1M U L T I - W A Y
1
S T 0 P
I K T 9 R S 9 C T 10 N 1
of Inallsis
'Date of Coun
09106189
Rxisting conditions
IL 0 S / C A P A C
I T Y C
A h C U h A T I O'K F 0 R K
- - ---------------------------------------------------------------------------------------------------------------------------
D A T A
I K P
0 T 'Step 1
'last Leg Volume
: 120 iRight-Turn Volume
last Leg
: 20 Suit X_W
ast L g =
120
'West Leg Volume
1
z 90 'Right -Turn Volume
1
West Leg
: 20 ----------------- 100 :30.2 %
'Sum
est Leg :
o th eg :
90
155
'North Leg Volume
1
: 155 'Right -Turn Volume
1
North Leg
Total VoluRe
35
o th Leg :
R Leg RT :
330
20
1
ISouth Leg Volume
: 330 lRight-Turn Volume
1
South Leg
25 Sum Total RY
W Leg RT :
N Leg RT :
20
35
Total
: 695
Total
1 ----------------- 100 :14.3 %
100 ISum Total Volume
S Leg RT :
1% Trucks :
'Area
25
2
----------------------------------- Area Type: ----------- 2
'Step IPercent
Type z
2
1 2
1 of Commercial
Vehicles (Trucks 4 Buses)
2.00 -----
CBD ----
Others --
1
2
'Step 3
lIntersection Capacity From Chart Below
...... 1 CBD
1547 1 2 Other
'Intersection
Type
2 2 'Step 4
----- -----
'Chart Capacity *
Right -Turn Adj. (+0.2% Per 1% RT) :
1591
----- 'Intersection Type: 2 2
'Step 5
'Step 4 * 0.95 (CBD/Interm. Areas) or 1.0 for others
:1591
'Step 6
1
'Step 7
'Step 5 * Commercial Vehicle adj. H% Per 1% T&B) : 1559 DRMAND SPLIT To 30
1 lvjwv I
'Total Inters. Vol. / Adj. Capac. Vol. : V/C Ratio - 0.44
�c
--------- -----------------------------------------------------
lint Typel 2t2
2*3 2*4 3*3 4*4
- -------------------------------
'LOS-CRITHRII FOR 4-WAY STOP
--- V/C Ratio
----------
---
Split
--- --- ---
---
LOS A : 0.00 TO 0.53
B : 0.53 TO 0.66
C : 0.66 TO 0.78
50/50
1900
2180 2460 2450
3000
D : 0.78 TO 0.91
R : 0.91 TO 1.00
55/45
1789
2088 2386 2264
2738
F ) 1.00
60/40
1678
1995 2312 2077
2476
65/35
1612
1944 2277 1956
2300
'This Intersection Operate
1
--------------------------------------------------------------------------------------------------------------------------------------
1 70/30
1547
1895 2241 1635
2124
lat L.O.S -------------
RRFEREHCRS:
------------
The methodology presented in this table is based on the following publications
01 Jaiues Reber ' S Study of Four -Way Stop Intersection Capacities.
'h cord 7, Highway esearch Board, Washington, D.C. (1963).
Rig way Researc Re 2 R
12 Inergy_Saving Traffic Operations Project Manual.
Barton Aschman Associates Inc., lvanston, III. (Sept. 1981)
13 Highway Capacity Manual -Special Report 209, Transportation Research Board,
Washington, D.C. (1985)
14 1965 Highway Capacity Manual, Rigway Research Board, Washington D.C., (1965)
#5 Hannson RT AL. " Capacity of Unsignalized Intersections-Swedish.Cagacity
Manual" Tran;rtation Research Record 667, Transportation Rese rc Board,
Washingion, D. . (1980)
--------------------------------------------------------------------------------------------------------------------------------------
Intersection
'Prepared
228th Street @ 84th
'Designed by: Zaher Mekkaoui
by
'Checked b y
'Date
ZHK
TLG
1M 9 L T I - W A Y
S T 0 P
I N T I R S 9 C T 1 0 K
of Anal
C
'Date of oun
vis
09/06/89
Future 1990 without
project + 3% GF
IL 0 S / C A P i C
I T Y C
A L C U L A T 1 0 N F 0 R M
D A T A
-------------------------------
I N P U T iStep I
- - - --
ilast Leg Volume
- --- ----------- ------
125 iRight-Turn Volume
---- ---
East Leg
- --
20
1 Sun I-W
ast L g :
125
1
lWest Leg Volume
95 'Right -Turn Volume
West Leg
20 1 ----------------- 100 :30.1
est Leg :
o th eg :
95
165
'North Leg Volume
: 165 'Right -Turn Volume
North Leg
40 'Sum Total Volume
South Leg :
9 Leg RT :
345
20
'South Leg Volume
: 345 'Right -Turn Volume
South Leg
: 25 San Total RT
1
W Leg RT :
20
1
----------------- 100 :14.3 %
N Leg RT :
40
Total
: 730
Total
: 105 'Sum Total Volume
1S Leg RT :
% Trucks :
'Area Type z
25
2
2
--------- ----------------------------------------------------------
step 2 Percent of Commercial Vehicles (Trucks +
'Area Type: ----------- > 2
Buses) 2.00 1 -----
1
I
1
CBD ----
1 Others --
I
2
IStep 3
'Intersection Capacity From Chart Below
----- 1 : CBD
1547 2 : Other
'Intersection
Type
2 2 'Step 4
'Chart Capacity *
Right -Turn Adj. (+0.2% Per
1% RT)
: 1591
Type: 2 2
'Step 5
'Step 4 t 0.95 (CBD/Interm. Areas) or 1.0
for others
:1591
'Step 6
'Step 5 t Commercial Vehicle adj. (-I% Per
1% T&B) :
1559 DEMAND SPLIT 70 30
'Step 7
'Total Inters. Vol. / Adj. Capac. Vol. : V/C
Ratio : 46
(19
-------------------------------
ILOS-CRITIRIA FOR 4-WAY STOP
I I
----------------------------------------------------------
lint Typel 2*2
2*3 2*4 3*3
4*4
1 Y/C Ratio
--- ----- ---
--- --- ---
---
LOS A : 0.00 TO 0.53
Split I I
I I I
I
B : 0.53 TO 0.66
C : 0.66 TO 0.78
1 50/50
1 1900
2180 2460 2450
3000
D : 0.78 TO 0.91
9 : 0.91 TO 1.00
55/45
1 1789
II
2088 2386 2264
2738
1 F > 1.00
60/40
1 1678
1995 2312 2077
2476
-------------------------------
1
65/35
1 1612
1944 2277 1956
2300
'This Intersection Operate
70/30
1 1547
1895 2241 1835
2124
lat LAS ------------- ) A
--------------------------------------------------------------------------------------------------------------------------------------
REFERENCES:
------------
The methodology presented in this table is based on the following publications
11 Jac ues Heber , *S Study of Four -Way Stop Intersection Capacities.
RgMy Research Record 27, Highway Research Board, Washington, D.C. (1963).
#2 Knergy_Saving Traffic Operations Project Manual.
Barton Aschman Associates Inc., Evanston, 111. (Sept. 1981)
#3 Highway Capacity Manual -Special Report 209, Transportation Research Board,
Washington, D.C. (1985)
#4 1965 Highway Capacity Manual, Higmay Research Board, Washington D.C., (1965)
#5 Hannson, IT AL. ' ' Capacity of Unsignalized Intersections -Swedish Ca
Manual* oTrans�ortation Research Record 667, Transportation Researlaciatyrd,
Washingi n I D. . (1980)
--------------------------------------------------------------------------------------------------------------------------------------
Intersection 228th Street @ 84th Designed by: Zaher Mekkaoui
'Prepared by ZMM
'Checked by TLG IN U L T I - W A Y S T 0 P I v T I R S I C T 1 0 K
'Date of Analysis 09/06/89 1 1
'Date of Count Future 1990 with project f 3% G? IL 0 S / C I P I C I T Y C I L C U L I T 10 K F 0 R K
D A T A I H P U T 'Step I 'last Leg Volume : 127 illight-Turn Volume Rast Leg 20 Sum R
------------------------------- I I _W
ast Leg : 127 Nest Leg Volume z 98 'Right -Turn Volume West Leg 23 ----------------- 100 =28.6
est L g z 98 1 1 'Sum Total Volume
0 th Leg z 18 'North Leg Volume : 186 'Right -Turn Volume North Leg 40
outh eg : 373 1 1
R Leg RT : 20 'South Leg Volume : 373 'Right -Turn Volume South Leg 27 Sum Total RT
W Leg RT : 23 1 1 1 ----------------- 100 :14.0 %
H Leg RT : 40 Total : 784 Total 110 'Sum Total Volume
I
S Leg RT : 27
1% Trucks : 2 --------- I ---------------------------------------------------------- 11rea Type: ----------- 2
'Area Type : 2 'Step 2 'Percent of Commercial Vehicles (Trucks + Buses) 2.00 -----
I CBD ---- I I I - 1 z CBD
Others -- 2 'Step 3 'Intersection Capacity From Chart Below 2 : Other
I I (ED I I
'Intersection Type 2 2 'Step 4 'Chart Capacity * Right -Turn Adj. (40.2% Per 1% RT) : 159
----- ----- I I .-! k,
Intersection Type: 2 2
'Step 5 'Step 4 * 0.95 (CBD/Interm. Areas) or-4—. Mor—others :i�i I I
I I ------ V51 o I
'Step 6 IStep 5 * Commercial Vehicle adj. (-I% Per 1% T&B) : 6f D SPLIT 70 30
1 1 _J_� ---- 11 MY
'Step 7 lTotal Inters. Vol. / Adj. Capac. Vol. : V/C Ratio : Q:.51 1)
__1 _ I
----------- --- ----- ----
'LOS-CRITRRII FOR 4-WAY STOP
-------------------------------------- - --- I I
----------------- V/C Ratio
lint Type 2*2 2*3 2*4 30 04 ----------
--- : ----- I --- --- --- --- --- LOS A : 0.00 TO 0.53
SRlit I I I B : 0.53 TO 0.66
C : 0.66 TO 0.78
D : 0.78 TO 0.91
1 50/50 1 1900 2180 2460 2450 3000 1 : 0.91 TO 1.00
55/45 1 1789 2088 2386 2264 2738 F 1.00
II -------------------------------
60/40 1 1678 1995 2312 2077 2476
65/35 1 1612 1944 2277 1956 2300 'This Intersection Operate
70/30 1 1895 2241 1835 2124 lat L.O.S ----- 7 -------
--------------------------------------------------------------------------------------------------------------------------------------
RURRINCKS:
------------
The methodology presented in this table is based on the following publications
#1 Jac ues Reber , "S Study of Four -Way Stop Intersection Capacities.
RiRvay Research Record 27, Highway Research Board, Washington, D.C. (1963).
92 Knergy_Saving Traffic Operations Project Manual.
Barton Ischman Associates Inc., Ivanston, III. (Sept. 1981)
03 Highway Capacity Manual -Special Report 209, Transportation Research Board,
Washington, D.C. (1985)
#4 1965 Highway Capacity Manual, Higway Research Board, Washington D.C., (1965)
#5 Hannson, RT AL. " Capacity of Unsignalized Intersections -Swedish Ca�acity
Manual", Transp;rtation Research Record 667, Transportation Researc Board,
Washington, D.C. (1980)
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 40
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ....................... 238TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... SR-104
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. 4:45-5:45 PM PEAK
OTHER INFORMATION: Existing Wednesday 08/30/89 count
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- ----
LEFT 9 8 17 77
THRO 8 7 106*8 662
RIGHT 18 126 57 10
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 2 3 2
LANE USAGE LTR LT + R
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
----------
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
4.00
90
----------------
20
-----------------
N
WESTBOUND
-4.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
0
-------------
14
-------------
0
WESTBOUND
0
1
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
2
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 5.90
5.90
0.00
5.90
EB 5.90
5.90
0.00
5.90
MAJOR LEFTS
SB
5.70
5.70
0.00
5.70
NB
5.70
5.70
0.00
5.70
MINOR THROUGHS
WB
7.10
7.10
0.00
7.10
EB
7.10
7.10
0.00
.7.10
MINOR LEFTS
WB
7.60
7.60
0.00
7.60
EB
7.60
7.60
0.00
7.60
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
6
60
38
>
45 38
>
33 32
>E_�.
THROUGH
6
75
58
>
58
>
53
>
E
RIGHT
101
634
634
634
533
A
MINOR STREET
EB LEFT
18
60
40
>
40
>
21
>
E
THROUGH
16
75
58
>
90 58
>
18 42
>E
E
RIGHT
37
678
678
>
678
X
641
>
A
MAJOR STREET
NB LEFT
17
508
508
508
491
A
SB LEFT
79
283
283
283
205'
c
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 40
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ...................... 238TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... SR-104
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: FUTURE 1990 W/O PROJECT + 3 % GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB
WB
NB
SB
----
LEFT 10
----
10
----
20
----
80
THRU 10
10
1100
685
RIGHT 20
130
60
10
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 2 3 2
LANE USAGE LTR LT + R
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
----------
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
4.00
90
----------------
20
-----------------
N
WESTBOUND
-4.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
EASTBOUND
-----------
0
-------------
14
-------------
0
WESTBOUND
0
1
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
2
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 5.90
5.90
0.00
5.90
EB 5.90
5.90
0.00
5.00
MAJOR LEFTS
SB
5.70
5.70
0.00
5.70
NB
5.70
5.70
0.00
5.70
MINOR THROUGHS
WB
7.10
7.10
0.00
7.10
EB
7.10
7.10
0.00
7.10
MINOR LEFTS
WB
7.60
7.60
0.00
7.60
EB
7.60
7.60
0.00
7.60
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB
LEFT
8
60
35
>
43 35
>
27 _�D_>E
E
THROUGH
8
75
56
>
56
>
48 >
E
RIGHT
105
623
623
623
518
A
MINOR
STREET
EB
LEFT
20
60
37
>
37
>
17 >
E
THROUGH
20
75
56
>
84 56
>
2 36 >E
E
RIGHT
41
667
667
>
667
>
626 >
A
MAJOR
STREET
NB
LEFT
20
493
493
493
473
A
SB
LEFT
82
270
270
270
188
D
f----
CD ( q 10 V4 fl&oowt-T,-
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 40
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 238TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... SR-104
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: FUTURE 1990 W/PROJECT + 3 % GF
INTERSECTION TYPE AND CONTROL
------------------------------------------- -------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB
WB
NB
SB
----
LEFT 10
----
10
----
20
----
110
THRU 10
10
1087
672
RIGHT 20
162
60
10
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 2 3 2
LANE USAGE LTR LT + R
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
----------
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
4.'00
90
----------------
20
-----------------
N
WESTBOUND
-4.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
0
-------------
14
-------------
0
WESTBOUND
0
1
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
2
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 5.90
5.90
0.00
5.90
EB 5.90
5.90
0.00
5.90
MAJOR LEFTS
SB
5.70
5.70
0.00
5.70
NB
5.70
5.70
0.00
5.70
MINOR THROUGHS
WB
7.10
7.10
0.00
7.10
EB
7.10
7.10
0.00
7.10
MINOR LEFTS
WB
7.60
7.60
0.00
7.60
EB
7.60
7.60
0.00
7.60
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) C = C v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
8
60
30
>
37 30
>
21 22
>E
E
THROUGH
8
75
49
>
49
>
>
_E
RIGHT
130
627
627
627
497
A
MINOR STREET
EB LEFT
20
60
31
>
31
>
11
>
E
THROUGH
20
75
49
>
72 49
>
-10 28
>F
E
RIGHT
41
673
673
>
673
>
632
>
A
MAJOR STREET
NB LEFT
20
502
502
502
482
A
SB LEFT
112
275
275
275
163.
D
f �ajTyya
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 35
PEAK HOUR FACTOR ................................. 1
AREA POPULATION ................................... 150000
,NAME OF THE EAST/WEST STREET ..................... 238th Street
NAME OF THE NORTH/SOUTH STREET ................... 84TH AVENUE
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: Existing condition
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB
NB
SB
---- ----
LEFT 45 20
----
10
----
60
THRU 95 95
115
35
RIGHT 5 80
25
15
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 1 1
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT RIGHT TURN CURB RADIUS (ft) ACCELERATION LANE
GRADE ANGLE FOR RIGHT TURNS FOR RIGHT TURNS
------- ---------- ---------------- -----------------
EASTBOUND 0.00 90 20 N
WESTBOUND 0.00 90 20 N
NORTHBOUND 0.00 90 20 N
SOUTHBOUND 0.00 90 20 N
VEHICLE COMPOSITION
----------------------------------------------------------------------
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES % MOTORCYCLES
----------- ------------- -------------
EASTBOUND 0 0
WESTBOUND 0 0
NORTHBOUND 0 0
SOUTHBOUND 0 0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
-------
VALUE .
ADJUSTMENT
CRITICAL GAP
7
MINOR RIGHTS
--------
-----------
------------
WB 5.70
5.70
0.00
5.70
EB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.10
5.10
0.00
5.10
NB
5.10
5.10
0.00
5.10
MINOR THROUGHS
WB
6.30
6.30
0.00
6.30
EB
6.30
6.30
0.00
6.30
MINOR LEFTS
WB
6.80
6.80
0.00
6.80
EB
6.80
6.80
0.00
6.80
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB
LEFT
20
542
469
>
469
>
449
>
A
THROUGH
96
680
651
>
718 651
>
521 555
>A
A
RIGHT
81
966
966
>
966
>
885
>
A
MINOR
STREET
EB
LEFT
45
482
398
>
398
>
-Asp
>
THROUGH
96
675
647
>
547 .647
>
401 551
>A
A
RIGHT
5
998
998
>
998
>
993
>
A
MAJOR
STREET
NB
LEFT
10
1000
1000
1000
990
A
SB
LEFT
61
994
994
994
933
A
e "
(D3 li5--" 6-�- 14",
1985 HCM: UNSIGNALIZED INTERSECTIONS Page -I
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 35
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 238TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... 84TH AVENUE W
NAME OF THE ANALYST ................. ............ ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/o6/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: Future 1990 without project + 3% GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB
NB
SB
LEFT 45 20
10
65
THRU 100 100
120
40
RIGHT 5 85
30
15
NUMBER OF.LANES AND LANE USAGE
------------------------------------------------------------ i --------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 1 1
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
-----------------
EASTBOUND
-------
0.00
----------
90
----------------
20
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
VEHICLES
% MOTORCYCLES
EASTBOUND
-----------
0
-------------
1
-------------
0
WESTBOUND
0
1
0
NORTHBOUND
0
1
0
SOUTHBOUND
0
1
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
--------------
MINOR RIGHTS
--------
-----------
------------
WB 5.70
5.70
0.00
5.70
EB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.10
5.10
0.00
5.10
NB
5.10
5.10
0.00
5.10
MINOR THROUGHS
WB
6.30
6.30
0.00
6.30
EB
6.30
6.30
0.00
6.30
MINOR LEFTS
WB
6.80
6.80
0.00
6.80
EB
6.80
6.80
0.00
6.80
CAPACITY AND LEVEL -OF -SERVICE . Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c - v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
20
524
447
>
447
>
427
>
A
THROUGH
101
665
634
>
704 634
>
497 533
>A
A
RIGHT
86
958
958
>
958
>
872
>
A
MINOR STREET
EB LEFT
45
463
375
>
375
>
�ju
>
THROUGH
101
658
628
>
528 628
>
377 527
>B
A
RIGHT
5
998
998
>
998
>_
993
>
A
MAJOR STREET
NB LEFT
10
1000
1000
1000
990.
A
SB LEFT
66
993
993
993
927
A
1985 HCM: UNSIGNALIZED INTERSECTIONS Page -I
IDENTIFYING INFORMATION
---------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET .............. 35
PEAK HOUR FACTOR ................................. 1
AREA POPULATION .................................. 150000
NAME OF THE EAST/WEST STREET ..................... 238TH STREET SW
NAME OF THE NORTH/SOUTH STREET ................... 84TH AVENUE W
NAME OF THE ANALYST .............................. ZMM
DATE OF THE ANALYSIS (mm/dd/yy) .................. 09/06/89
TIME PERIOD ANALYZED ............................. PM PEAK HOUR
OTHER INFORMATION: Future 1990 with project + 3% GF
INTERSECTION TYPE AND CONTROL
---------------------------------------------------------------------
INTERSECTION TYPE: 4-LEG
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
CONTROL TYPE WESTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB
----
NB
SB
----
LEFT 45 29
----
10
----
91
THRU 130 132
120
40
RIGHT 5 113
39
15
NUMBER OF LANES AND LANE USAGE
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 1 1 1 1
LANE USAGE LTR LTR
ADJUSTMENT FACTORS Page-2
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
-------
ANGLE
----------
FOR RIGHT TURNS
FOR RIGHT TURNS
EASTBOUND
0.00
90
----------------
20
-----------------
N
WESTBOUND
0.00
90
20
N
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
% SU TRUCKS
% COMBINATION
AND RV'S
-----------
VEHICLES
% MOTORCYCLES
EASTBOUND
0
-------------
-------------
0
WESTBOUND
0
0
NORTHBOUND
0
0
SOUTHBOUND
0
0
CRITICAL GAPS
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
--------------
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------
-----------
------------
WB 5.70
5.70
0.00
5.70
EB 5.70
5.70
0.00
5.70
MAJOR LEFTS
SB
5.10
5.10
0.00
5.10
NB
5.10
5-10
0.00
5.10
MINOR THROUGHS
WB
6.30
6.30
0.00
6.30
EB
6.30
6.30
0.00
.6.30
MINOR LEFTS
WB
6.80
6.80
0.00
6.80
EB
6.80
6.80
0.00
6.80
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c c v LOS
p M SH R SH
------- -------- --------- ------------ ------------ ---
MINOR STREET
WB LEFT
THROUGH
RIGHT
MINOR STREET
EB LEFT
THROUGH
RIGHT
MAJOR STREET
NB LEFT
SB LEFT
29 480 383 > 383 > 354 > B
133 639 600 > 661 600 > 385 466 >B A
114 954 954 > 954 > 839 > A
45
401
297
> 297
> 2-5-1
> C,'
131
629
591
> 478 591
> 296 459
>C A
5
998
998
> .998
X 993
> A
10
1000
1000
1000
990
A
92
991
991
991
899
A
4C
1985 HCM: UNSIGNALIZED INTERSECTIONS Page-1
IDENTIFYING INFORMATION
----------------------------------------------------------------------
AVERAGE RUNNING SPEED, MAJOR STREET.. 45
PEAK HOUR FACTOR ..................... 1
AREA POPULATION ....................... 150000
NAME OF THE EAST/WEST STREET ......... PRIMARY ENTRA14CE
NAME OF THE NORTH/SOUTH STREET ....... SR-99
NAME OF THE ANALYST .................. T GIBSON
DATE OF THE ANALYSIS (mm/dd/yy) ...... 10/23/89
TIME PERIOD ANALYZED ................. PM PEAK HOUR
OTHER INFORMATION .... FUTURE 1990 CONDITIONS W/PROJECT + 3 % GF
INTERSECTION TYPE AND CONTROL
----------------------------------------------------------------------
INTERSECTION TYPE: T-INTERSECTION
MAJOR STREET DIRECTION: NORTH/SOUTH
CONTROL TYPE EASTBOUND: STOP SIGN
TRAFFIC VOLUMES
---------------------------------------------------------------------
EB WB NB SB
---- ---- ---- - ----
LEFT 71 71 0
q,() Ae Pon Sl
THRU 0 0 69
RIGHT 73 0 1019
NUMBER OF LANES
---------------------------------------------------------------------
EB WB NB SB
------- ------- ------- -------
LANES 2 2 2
ADJUSTMENT FACTORS Page-2
---------------------------------------------------------------------
PERCENT
RIGHT TURN
CURB RADIUS (ft)
ACCELERATION LANE
GRADE
ANGLE
FOR RIGHT TURNS
FOR RIGHT TURNS
-----------------
EASTBOUND
-------
0.00
----------
90
----------------
20
N
WESTBOUND
-----
---
---
NORTHBOUND
0.00
90
20
N
SOUTHBOUND
0.00
90
20
N
VEHICLE COMPOSITION
----------------------------------------------------------------------
% SU TRUCKS % COMBINATION
AND RV'S VEHICLES % MOTORCYCLES
---------- 7 ------------- -------------
EASTBOUND
0
0
0
WESTBOUND
---
---
---
NORTHBOUND
0
1
0
SOUTHBOUND
0
1
0
CRITICAL GAPS
---------------------------------------------------------
7 -----------
TABULAR VALUES
ADJUSTED
SIGHT DIST.
FINAL
(Table 10-2)
VALUE
ADJUSTMENT
CRITICAL GAP
MINOR RIGHTS
--------------
--------
-----------
------------
EB
6.10
6.10
0.00
6.10
MAJOR LEFTS
NB
5.80
5.80
0.00
5.80
MINOR LEFTS
EB 7.90 7.90 0.00 7.90
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET ...... PRIMARY ENTRANCE
NAME OF THE NORTH/SOUTH STREET .... SR-99
DATE AND TIME OF THE ANALYSIS ..... 10/23/89 PM PEAK HOUR
OTHER INFORMATION .... FUTURE 1990 CONDITIONS W/PROJECT + 3 % GF
Jk I .' 'w - I .-V .
CAPACITY AND LEVEL -OF -SERVICE Page-3
---------------------------------------------------------------------
POTEN- ACTUAL
FLOW- TIAL MOVEMENT SHARED RESERVE
RATE CAPACITY CAPACITY CAPACITY CAPACITY
MOVEMENT v(pcph) c (pcph) c (pcph) c (pcph) c = c v LOS
p M SH R SH
------- -------- --------- ------------- ------------ ---
MINOR STREET
EB LEFT 71 279 223 223 152 D
RIGHT 73 508 508 508 4-3-5 IT
MAJOR STREET
NB LEFT 72 264 264 264 192 D
IDENTIFYING INFORMATION
NAME OF THE EAST/WEST STREET ...... PRIMARY ENTRANCE
NAME OF THE NORTH/SOUTH STREET .... SR-99
DATE AND TIME OF THE ANALYSIS ..... 10/23/89 ; PM PEAK HOUR
OTHER INFORMATION .... FUTURE 1990 CONDITIONS W/PROJECT + 3 % GF
�t-4 C. 18 9 11
July 15, 2002
-CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 1 (425) 771-0220 * FAX (425) 771-0221
Website: wwwdedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
Planning - Building - Engineering
Safeway
National Retail Partners
10135 SE Sunnyside Road, #250
Clackamas, OR 97015
RE: Safewav Marketplace Store Located in Edmonds, W
Dear Property Owner,
GARY HAAKENSON---
MAYOR
Our records indicate that you are the owners of the subject property at Highway 99 and 236h
Street SW in Edmonds, Washington. We have received a complaint that "near misses" have
occurred near your store entrance along 236th Street SW. The pavement markings at this ingress
and egress location have worn off, and some drivers perceive this access point as having three
lanes while others perceive it as only having two lanes.
In order to reduce the hazard and enhance public safety, the City of Edmonds is requesting that
you restripe the ingress and egress channelization at this access location. This should
significantly enhance public safety and reduce your liability.
We encourage you to complete this work by the end of the summer. Please feel free to call me
with any questions at 425-771-0220, Ext. 1328.
Sincerely,
DARRELL C. SMITH, P.E.
Traffic Engineer
DCS/cmc
c: Jason Tourtellot, Code Enforcement Officer
David K. Gebert, City Engineer
Jim Kammerer, Street Division Manager
S:WNGR\DARRELLkTrafric*Concem\Safeway LMcr.&c * Incorporated August 11, 1890
Sister City - Hekinan, Japan
AV
MEMORANDUM
Date: June 28, 1999
To: File ADB-99-1 15
Street File 23632 Hwy 99 suite#Al
Plan Check #
From: Steve Bullock -W�
Senior Planner
Subject: ADMINISTRATIVE DESIGN REVIEW APPROVAL FOR SIGN
REPLACEMENT.
Since the proposed sign is a replacement of an existing individual letter sign, and because it is
within the area allowed for its tennant space, and because the proposed sign colors and design are
determined to be consistant with existing signs and design of the building, Planning Staff
administratively approves the design of the Papa Murphy's Pizza sign at 23632 Highway 99 #Al.
City of Edmonds cQ Planning Division
99032SR 'DOC
06/28/99.
PLANNING DATA
NAME:
SITE ADDRESS: q —DATE:
±E.
ZONING: r PLAN CHK�.
C,
PROJECT DESCRIPTION:
'2-
U\j
USE(S) PROPOSED:—t6 — P'Lt ALLOWED?:
LEGA� NONQPNFORMING LAND USE DOTERMINATION ISSUED11A (Y/N)
CUP File: IV in
ADS FILE [A OR DATE WAIVED:
PLANS MATCH APPROVED PLAN:
PARKING
use: No. Spaces Required:
X (floor area, # employees, etc.)
Use: No. Spaces Required:
X (floor area, # employees, etc.)
Total Required: Actual Provided:
SETBACKS:
Required Setbacks- A114
Front: Left Side:_ Right SIde:_Rear:
Actual Setbacks:
Front: Left Side: -Right Side: Rear:
Street map checked for additional setback required? —(Yes/No)
MAXIMUM FLOOR AREA:
Maximum Allowed Actual:
BUILDING HEIGHT:
Maximum Allowed:-O -Actual Height: —
Modulation Allowed?-' Modulation Height:
Datum Point: ---Datum Elevation: —
LANDSCAPING:
Matches ADS approved: -
Bond:
SUBDIVISION:
CRITICAL AREAS
GAfi1c3%permPrPLANDAa.D0C C over )
a
SEPA DETERMINATION: VIA,
SHORELINE REQUIRED?: 1A
LOT AGGREGATION REQUIREM:
i
cAfflas\parmi\t^FLANDAc,D0C
Adh .rN. -
The following items are required with your permit application: I
EXI
I I
00
I I
[X1
This form must be submitted with the application
• traffic study must be submitted with the application
• traffic study is not required
• Development Application Review Fee must be paid $
• Development Application Review Fee is not required
Route application to DPW for review
Do not route application to DPW
1 . DATE 5C 7 1Y
2.
s T Z/V R I-F
3. DEVELOPER /"y
4. REPRESENTATIVE
5. NAME OF DEVELOPMENT
t,2
6. TYPE OF DEVELOPMENT Z'wu�z
SIZE
7. LOCATION OF SITE 9,2:
AREA
8. COMPREHENSIVE PLANNING
9. DEVELOPMENT'S ROAD SYSTEM (TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMATION PROVIDED BY THE
DEVELOPER:
I KI A TRAFFIC STUDY IS NOT REQUIRED
(The developer may choose to perform a traffic study, however, to show that the proposed development does not
place three or more peak hour trips through a specific location)
I A TRAFFIC STUDY IS REQUIRED
(See Traffic Study Checklist C-4200-2 for specifics)
I A REGIONAL TRAFFIC STUDY MUST BE COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE PROCESSED
(Se egionaL Traffic Study Checklist C-4200-5 for specifics)
17 7
TY
0 ISH COUNTY DATE FOR DEViLbPER DATE
REVISED MARCH 7, 1991 PAGE 1 OF 2 CHECKLIST C-4200-1
YELLOW COPY - APPLICANT PINK COPY - DPW FILE
11. BASED ON INFORMATION PROVIDED BY THE APPLICANT AT THE PRESUBMITTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE
FOLLOWING TRAFFIC IMPACTS HAVE BEEN IDENTIFIED AND WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS
NEEDED TO DETERMINE IMPACT MITIGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
12.
COMMENTS/OTHER PERTINENT DATA DISCUSSED:- a-s a" -c
7 c
-27-71
SNOHOMIS� COUNTY DATE
FOR DEVELOPER DATE
REVISED MARCH 7, 1991 PAGE 2 OF 2 CHECKLIST C-4200-1
YELLOW COPY - APPLICANT PINK COPY - DPW FILE
0
ST,
0 0
A 0
cfn) _AL-�
0(5.
OFFICE
WILLIS D. TUCKER PROJECT
Countv Executive
0
OF COMMUNITY DEVELOPMENT
4th Floor, County Administration Building
Everett, Washington 98201
259-9388 or 259-9311
Tall Free: 1-800-562-4367 Scan Prefix: 649
ADDRESS.
AZ(R�OAVA
PLEASE BE 'AWARE THAT THE FOLLOWING CONDITIONS APPLY TO THIS PROJECTr
All construction is subject to fie] d inspections, corrections and final field
approval.
The issuance of a Certificate of Occupancy prior to the building being occupied.
No concrete shall be poured without inspections. Notify the Division of Inspection
Compliance at least twenty-four (24) hours in advance.
An approved set of plans shall be kept at -the job site at all times during con-,'
struction.
A separate permit shall be require d for mechanical -heating and venting systems.
A separate permit shall be required for plumbing work.'
11K, To Obtai n., electrical permit and' -inspection contact the*State Department of
Labor t Industries, Electrical Division at (206) ZE4- 2,992-
Use of Building: &F4-1/m 2A4X_T Construction Type:
basemenL
rirst ,)zor�y
�)econa btory
Third Story
Area:
Occ. Group:
Occ. Load:
Area:-/ A66 SF
Occ. Group:
Occ. Load: 36
Area:
0 cc.*Group:
Occ. Load:
Area:
Occ. Group:
Occ. Load:
If we can be of any further *assistance to you, please feel free to contact
US.
Date:
Plan Check#.
Code Compifiance Inspector
DIVISION OF TECHNICAL REVIEW DIVISION OF INSPECTION & COMPLIANCE
a.m. - 5 p.m. a,68-;-3_Tf1 8'-a.m. - 9 a.m.
DIVISION OF DIVISION OF' DIVISION OF
INFORMATION . SERVICES TECHNICAL REVIEW INSPECTION & COMPLIANCE
? lo
SNOHOMISH COUNTY DEPARTMENT OF V
PRESUBMITTAL CONFERENCE REVI
THIS BOX FOR COUNTY USE ONLY
IP-z-', eg 09.4
x
IC ZiRKS
FOR
NOTICE TO CDD COUNTER STAFF AND PERMIT APPLICANT:
The following items are required with your permit application:
[X] This form must be submitted with the application
A traffic study must be submitted with the application
[X] A traffic study is not required
A Development Application Review Fee must be paid $
[X] A Development Application Review Fee is not required
Routs application to DPW for review
Do not route application to DPW
1 DATE 2. S T ;� 7 R
3. DEVELOPER j�� 2 /0,0CW et:L%�
4. REPRESENTATIVE
5. NAME OF DEVELOPMENT "6 r,2 Ire T- 1 1.74 if
zew SIZE
6. TYPE OF DEVELOPMENT &5 0 --!!!V
74
7. LOCATION OF SITE es e Ale-ryl 03,� '51 'e. 4)
8. COMPREHENSIVE PLANNING AREA
9. DEVELOPMENT'S ROAD SYSTEM (TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMATION PROVIDED BY THE
DEVELOPER:
I A TRAFFIC STUDY IS NOT REQUIRED
(The developer may choose to perform a traffic study, however, to show that the proposed development does not
place three or more peak hour trips through a specific location)
I A TRAFFIC STUDY IS REQUIRED
(See Traffic Study Checklist C-4200-2 for specifics)
C I A REGIONAL TRAFFIC STUDY MUST BE COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE PROCESSED
(See Regional Traffic Study Checklist C-4200-5 for specifics)
ZSNOMISH COUNTY DATE DE 0 4PE D ��E
REVISED MARCH 7, 1991 PAGE 1 OF 2 CHECKLIST C-4200-1
YELLOW COPY - APPLICANT PINK COPY - DPW FILE
11. -4ASED ON INFORMATION PROVIDEC(RY THE APPLICANT AT THE PRESUBMITTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE
FOL,Li)WfNG TRAFFIC IMPACTS HAVE BEEN IDENTIFIED AND WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS
REEDED TO DETERMINE IMPACT MITIGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
FUTURE CAPACITY:
12. COMMENTS/OTHER PERTINENT DATA DISCUSSED:- Zpv /'? IV j s
REVISED MARCH 7, 1991
YELLOW COPY - APPLICANT
PAGE 2 OF 2
CHECKLIST C-4200-1
PINK COPY - DPW FILE
I
OFFICE OF COMMUNITY DEVELOPMENT
41h Floor, County Administration Building
Everett, Washington 98201
259-9388 or 259-9311
Toll Free: 1-800-562-4367 Scan Prefix: 649
IN
WILLIS D. TUCKER PROJECT N
County Executive
ADDRESS
A -A
PLEASE BE AWARE THAT -THE FOLLOWING CONDITIONS APPLY TO THIS PROJECTr
All construction is subject to field inspections, corrections and final field
approval.
The issuance of a Certificate of Occupancy prior to the building being occupied.
No concrete shall be poured without inspections. Notify the Division of Inspection
Compliance at least twenty-four (24) hours in advance.
An approved set of plans shall be kept at --the job site at all times during con-
struction.
P< A separate permit.shall be required for mechanical heating and venting systems.
A sep*arate permit shall be required for plumbing work.
To obtain electrical permit and'inspection contact the State Department of
Labor & industries, Electrical Division at (2o6) ZS-47 2,99Z
Use of Building: g�0 'A Construction Type:
DdbemenL
rirsT z)-cory
')econa btory
Third Story
Area:
Occ. Group:
Occ. Load:
Area: 1196
Occ. Group:
Occ-. Load:
Area:
Occ. Group:
Occ. Load:
Area:
Oc'c. Group:
Occ. Load:
If we.can be of.any further assistance to you, please feel free to contact
US.
Date
Plan Check Igo,- c
Code Co liance Inspector
DIVISION OF TECHNICAL REVIEW DIVISION OF INSPECTION & COMPLIANCE
3" -39-PO 9 a.m. - 5 p.m.* . a88`-351'1. 8**a.m. - 9 a.m.
DIVISION'OF DIVISION OF DIVISION OF
INFORMATION SERVICES TECHNICAL REVIEW INSPECTIO14 COMPLIANCE
SNOHOMISH Serving the Public Health of Snohomish County and its Incorporated Cities and Towns
HEALTH M. WARD HINDS, M.D., M.P.H.,
DISTRICT Health Officer
Vital Statistics (206) 339-5280 Administration Office . (206) 339-5210
Clinic Service (206) 339-5220 Community Health Division (206) 339-5230
Sanitation Program (206) 339-5270 Environmental Health Division (206) 339-5250
FAX (206) 339-5216
October 16, 1991
Bob Christensen
3417 228th S.E.
Bothell, Washington 98021
Subject: Proposed, Mr. C's Espresso Bar, 1715 228th S.E., Bothell
Dear Mr. Christensen:
Your plans have been reviewed for compliance with the Rules and Regulations of the State Board
of Health, and with the policies of the Snohomish Health District. With the addition of the
following items, the plans are approved.
All equipment must be new and listed by the National Sanitation Foundation. The use of used
equipment will require prior written approval by Snohomish Health District.
2. All interior cabinetry must meet the Architectural Woodwork Institute Quality Standards.
3. The Health District operating permit. application process has been completed. The permit
will be issued after a pre -operational inspection verifies compliance with the Rules and
Regulations of the State Board of Health for Food Service Sanitation.
A pre -operational inspection -is required prior to opening for business. Please contact the Food
Section office about one week in advance to schedule an appointment.
If there are an y significant changes or additions to your layout or equipment, the Snohomish
Health District must be notified. -
Please contact me if you have any questions. My office number is 339-5250.
Sincerely,
Rick Za alka, R.S.
Environmental Health Specialist
RZ:sei
Snohomish County Building Department
Environmental Health Division, 3020 Rucker Ave., Suite 102, Everett, WA 98201-3971
ser, Vor FRUITLAND ACRES DIV 2-
[.'FRUITLAND ACRES,."".TO "LAKE BALLINGER TO LAKE BALLINGER (4A
20
If L
2-36th. ST S.W
0 B 8 7 �rW-L7,LOW
LLI ww
A 7 to cord*)
00 01 11 OV >< f6997)
LA MIRAa
S 21 - 15',
7 6 6 0)
R 231
C)
�/64) 5
(6/22 lf� Ir
2
4 5 4 DIV 4
At A I A A A DD fA
Vf
u I C,
12 1 WLEL
02 0/ 6 5 4
01-ev,R Z31(6/2-2/64) JO
0
02, 1301 15 16. 17 1 18 19 A 20 21 22 69 7 8th. Pi
R60 1956 02-
04- 01
00
05 700
238th. ST SW
-T 7-
3!
8 00 9 17
R 5� 4 0/ 00 — 05 JO- L Oil
0/ 2 /0 16
7 7
8' -7102 0014;
6 5 - 4' a) 15
co 6 01//
3
5 021,2:1 D 01\
02 0/
2
U2
c\1 ;G/- A 7 / D12
C/
jj7)-- F
01. k
18 JQ)
tzoA 16 of i:, 171 0311902 20 2
0, 01. 6 7 8
15
Ccm' 0 K 14
T 7 0 14.0
00 04 0 07 0+11 0 D
mct"01CA ! / Cc)
(JK.
—Z-40 01— -ST-5—W.—
wi LM I
-T
Ob bot,
tr0b,
06 01 1 04
L,14
4i'
N�:
"-tO
;'A
Snohomish County Community Development
Crcff_4 R. Ladiser, Director
4th Floor, Administration Bldg.
Everett, Washington 98201
Willis D. Tucker, County Executive
October 18, 1991
Richard Embry, Project Manager
Gramor Development, Inc.
4211 - 200th Street S.W., "#202
Lynnwood, Washington 98036
RE: AURORA MARKETPLACE
Commercial Building Permits: 51753-51759
Commercial Building Permit Application: C8910481
ccount--Nux er: -004;;0-lM
_45 W
Dear Richard:
Regarding your question during oui meeting yesterday about zoning of
the Aurora Marketplace project site, please see the enclosed c6py of a
zoning map for the subject property. A change in zoning is indicated
by the black dashed lines. The long -short dashed line indicates a
city limit boundary. Note that the entire site is zoned GC -General
Commercial, with MR -Multiple Residential zoning to the west.
The building permits, as issued, indicate our approval for zoning code
compliance (Snohomish County Code - Title 18).
I hope this information is helpful.
questions, please call.
S incerely,
A17-n gldtlnly_)5�
Ron Alldredge
Site Review Supervisor
RA/se
Should you have any further'
cc: Tracy Justice, Snohomish County Inspection Department
(206) 388-3311
Toll Free: 1-800-562-4367
An Equal Opporturdty Employer
44
(46 9) Noov �Jlln,
FRUITLA
TO LAKE
256 h. 9T S.W
238th. ST SW
116)
Snohomish County Community Development
Ernie Berg, Manager
4th Floor. Administration Bldg,
Everett.'Washington 98201
Willis D. Tucker. County Executive
SPECIAL CONDITIONS FOR COWERCIAL PERKT #51753,51754, 51755, 51756, 51757, 51758 &
51759
COMMNITY DEVELOPMENT DIVISION
1) C 8910481
2).Prior to any issuance of a Certificate of Occupancy, the applicant shall:
a) Complete all arking areas and site landscaping per approved plans (sheets
A-2.1 and L_15
b).Submit for approval a Bond or Assignment of Funds for landscape maintenance
(total shall be 110% of est. landscape and irrigation costs and shall run for
period of 2 years from date of approval). I
3) Project/Business Identification and advert is ing/di splay signs shall require
separate permits and shaljC�eTsubjejg.4. the signage allotment approved 10-10-90 a
FTRF. -RF.VTF.W- n-r.-r)- ities 040.
2)
3)
DEPARTMENT OF PUBLIC WORKS
DRAINAGE:
I
Prior to building o._,cupancy, a drainage inspection approval -will be required.
2)
3)
4) i
TRAFFIC:
Road improvements along the subject property frontage shall be. completed prior to
the issuance of any occupancy permits- and in compliance with WSDO`T Developer
Agreement regarding the subject property.
2) Improvements at the intersection of 236th St SW and SR99 as approved by DPW and
WSDO`T shall be completed prior to the issuance of any occupancy permits, and in
compliance with WSDOT Developer Agreement regarding the subject property.
(206) 259-9311
Toll Free: 1-800-562-4367
An Equal Opportunity Employer
SNOHOMISH COUNTY
Commercial Contact PerSion Form
C,9 10 3 0 8,1'
YOUR PROJECT FILE NUMBER IS
CONTACT PERSON:
FIRM:
ADDRESS: I - zevt: !ED. L4J. -tL- -,7 C)
CITY: STATE: L.J
( &-iONE NUMBER: -7-74 - on98
SIGNED:
ZIP CODE: '1930-3&
DATED:
Should you have any questions regarding your project or
should you wish to check on the status) You can contact
us at 259-9390 between the hours of 8:00am and 5:00pm
Monday through Friday. Please have your commercial
project number available.
60
PRESUBMITTAL CONFERENCE REVIEW FORK
1 DATE 2. S T R 0 A-
3. DEVELOPER NAME t>r--Ve—��MM -1�
L
ADDRESS-4 i Zov -s" V, A:r- 7-0 z TELEPHONE -7-74 5
4. REPRESENTATIVE NAME ff?g�j
ADDRESS TELEPHONE
I
5. NAME OF DEVELOPMENT AAJ F-tS) VI& MA, I — C— L—EA6-w U
6. TYPE OF DEVELOPMENT SIZE Ll 11,5
7. LOCATION OF SITE tL t;, S
8. COMPREHENSIVE PLANNING AREA
9. DEVELOPMENT'S ROAD SYSTEM (TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMA71ON PROVIDED BY THE DEVELOPER:
I A TRAFFIC STUDY IS NOT REQUIRED
(THE DEVELOPER MAY CHOOSE TO PERFORM A TRAFFIC STUDY HOWEVER TO SHOW THAT THE PROPOSED DEVELOPMENT DOES NOT
PLACE THREE OR MORE PEAK HOUR TRIPS THROUGH A SPECIFIC LOCATION)
I A TRAFFIC STUDY IS REQUIRED
(SEE TRAFFIC STUDY CHECKLIST C-4200-2 FOR SPECIFICS)
E I
COMMENTS:
A REGIONAL TRAFFIC STUDY MUST BE COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE: PROCESSED
(SEE REGIONAL TRAFFIC STUDY CHECKLIST C-4200-5 FOR SPECIFICS)
T
,�L
0
cc"
j
PUBLIC WORKS
January 29, 1991 PAGE 1 OF 2 Checklist C-4200-1
11. BASEC- ON INFORMATION PROVIDED BY THE APPLICANT AT THE PRESUBMITTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE FOLLOW-
INIT TRAFFIC IMPACTS HAVE BEEN IDENTIFIED AND WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS NEEDED TO DE-
TERMINE IMPACT MITGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
FUTURE CAPACITY:
12. OTHER PERTINENT DATA DISCUSSED:
V, kh
f7eQ, (TO BE PAID AT TIME OF APPLICATION SUBMITTAL)
13. DEVELOPMENT APPLICATION REVIEW FEE: $ �j
SNOHOMISH DATE FOR DEVELOPER DATE
PUBLIC WORKS
January 29, 1991 PAGE 2 OF 2 Checktist C-4200-1
0
0
A L)
U, A,
=C*M>-FA- CIF-
oc>c;>
y
Usc-
-4 S- A-)
/I boa)
ZL
'T
7-7
ra
99
jos-O:E�
-11 u4--1 I
PRESUBMITTAL CONtERENCE REVIEW FORM
I
DATE
2. fc;
->I T R
3.
DEVELOPER NAME
ADDRESS I k zx9v
TELEPHONE
-T74 '0041 S
4.
REPRESENTATIVE NAME
L e_Lx&F-1C> e-" (Sj�-�v
ADDRESS
TELEPHONE
5.
NAME OF DEVELOPMENT ArQ
F4> V,& L-A-C-F—
N�-� C- L-Soa-"
U
6.
TYPE OF DEVELOPMENT
C-e" t-le-mcl 6.L-
SIZE
7.
LOCATION OF SITE
3-2-
E-t> Pn tL r-�, r.-,
9b I
B.
COMPREHENSIVE PLANNING AREA
LIJ
9. DEVELOPMENT'S ROAD SYSTEM (TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMATIONPROVIDED BY THE DEVELOPER:
COMMENTS:
A TRAFFIC STUDY IS NOT REQUIRED
(THE DEVELOPER MAY CHOOSE TO PERFORM A TRAFFIC STUDY HOWEVER TO SHOW THAT THE PROPOSED DEVELOPMENT DOES NOT
PLACE THREE OR MORE PEAK HOUR. TRIPS THROUGH A SPECIFIC LOCATION)
A TRAFFIC STUDY IS REQUIRED
(SEE TRAFFIC STUDY CHECKLIST-C-4200-2 FOR SPECIFICS)
A REGIONAL TRAFFIC STUDY MUST BE -COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE PROCESSED
(SEE REGIONAL TRAFFIC STUDY CHECKLIST C-4200-5 FOR SPECIFICS)
()CUA
L
oA,vk-�,�j
1z
k4,v-o r-c�-
�C,o-ce-- ,
PUBLIC WORKS
January 29, 1991. PAGE 1 OF 2 Checklist C-4200-1
BASED -ON INFORMATION PROVIDED BY THE,APPLICANT AT THE PRESUB'MiTTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE FOLLOW -
_,I NG '; RAFFIC IMPACTS HAVE BEEN IDENTIFIED AND WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS NEEDED TO DE-
TERMINE -IMPACT MITGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
FUTURE CAPACITY
LEVEL -OF -SERVICE:
INADEQUATE ROAD CONDITION:
FRONTAGE IMPROVEMENTS:
RIGHT-OF-WAY:
1;. OTHER PERTINENT DATA D ISCUSSED
a -
13. DEVELOPMENT APPLICATION REVIEW FEE: $ (TO BE PAID AT TIME OF APPLICATION SUBMITTAL)
FOR DEVELOPER
SNOHOMISH COUNTY DATE
DATE
PUBLIC WORKS
January 29, 1991 PAGE 2 OF 2 CheckList C-4200-1
SN.OHOMISH COUNTY
Co.mmercial Contact Per%son Form
YOUR PROJECT FILE NUMBER IS 10-3083
CONTACT PERSON:
FIRM:
ADDRESS:
CITY: STATE: ('J ZIP CODE:
( &.,ONE NUMBER: -7-74 - noie
SIGNED: z�"Z';� 5�- ,
DATED:
Should you have any questions regarding your project or
should you wish to check on the status, YOU can contact
us at 259-9390 between the hours of 8:00am and 5:00prn
Monday through Friday. Please have your commercial
project number available.
PRESUBMITTAL CONVERENCE REVItW FORM
1 . DATE 2. S T Z-7 R
3. DEVELOPER NAME
.ADDRESS S4"01!= L'i TELEPHONE -- -7-74 -'oo-ie
4. REPRESENTATIVE NAME k e, 14pr- I> V--v
ADDRESS TELEPHONE
5. NAME OF DEVELOPMENT
6. TYPE OF DEVELOPMENT SIZE 2,f 20 s
7. LOCATION.OF SITE k1a
8. COMPREHENSIVE PLANNING AREA Lo . :5"e>140 M I S, i4 C-.4>L-) t..A
9. DEVELOPMENT'S ROAD SYSTEM (TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMATION PROVIDED BY THE DEVELOPER:
I A TRAFFIC STUDY IS NOT REQUIRED
(THE DEVELOPER MAY CHOOSE TO PERFORM A TRAFFIC STUDY.HOWEVER TO SHOW THAT THE PROPOSED DEVELOPMENT DOES NOT
PLACE THREE OR MORE PEAK HOUR TRIPS THROUGH A SPECIFIC LOCATION)
I I A TRAFFIC STUDY IS REQUIRED.
. . (SEE TRAFFIC STUDY CHECKLIST C-4200�2 FOR SPECIFICS)
COMMENTS.
I A REGIONAL TRAFFIC STUDY MUST BE COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE PROCESSED
. (SEE REGIONAL TRAFFIC STUDY CHECKLIST-C-4200-5 FOR SPECIFICS)
aAAW,ous L", L,
v A, . %-j
cAdm
t\o VC C,CAJ� ?hko, "tt m V twvL,�4 to,, cl� -k4
PUBLIC WORKS
January 29, 1991 PAGE 1 OF 2 Checklist C-4200-1
BASED ON INFORMATION PROVIDED BY THE APPLICANT AT THE PRESUBMITTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE FOLLOW-
ING TRAFFIC IMPACTS HAVE BEEN IDENTIFIED AND -WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS NEEDED TO DE-
TERMINE IMPACT.MITGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
FUTURE CAPACITY:
LEVEL -OF -SERVICE:
INADEQUATE ROAD CONDITION:
1,13
FRONTAGE IMPROVEMENTS
RIGHT-OF-WAY:
12. OTHER PERTINENT DATA DISCUSSED:
"ve-wo."al Vvp ry oe ,-,,.vl
13. DEVELOPMENT APPLICATION REVIEW FEE: $ (TO BE PAID AT TIME OF APPLICATION SUBMITTAL)
21-v 9
SNOHOMISH COUNTY DATE
FOR DEVELOPER _�ATE
PUBLIC WORKS
January 29, 1991 PAGE 2 OF 2 Checktist C-6200-1
0
A� 0
0
0
*_0
�-3
En
WILLIS D. TUCKER
County Executive,
OFFICE OF COMMUNITY DEVELOPMENT
41h - Floor, Cou�ty Administration Building
Everett. Washington 98201
259-9388 or 259-9311
Toll Free: 1-800-562-4367 Scan Prefix: 549
P ROJECT NAM.6
ADDRESS
PLEASE BE AWARE THAT THE FOLLOWING CONDITIONS APPLY TO THIS PROJECT!'
All construction is subject to field inspections', corrections and final field
approval.
The issuance of a Certificate of Occupancy prior to' the-buil ding being occupied.
No concrete shall be poured without inspections. Notify the Division of Inspection
Compliance at least twenty-four (24) hours in advance.
An approved set of plans shall be kept at -the job site at all times during Con-
struction.
A separate permit shall be requir ed for mechanical heating and venting systems.
A separate permit shall be required for plumbing*work.
N/
To obtain electrical permit and' -inspection con.tact the State Departinent of
Labor & Industries', Electrical Division iat (2o6) ZS-4-2,1332_
4
Use of Constructi*on Type: VA)
54-
basemenz
rirsL
jecona story
Third Story
Area:
cc. G r
0 . L oad.
Area:
Occ. Group:
Occ. Load:
Area:
OCC oup:
Occc.*Loadp:-
Area:
Oc'c. Grou p�
0 cx_-_�o a d
I f we can be, of any f urther ass i stance to you, please feel f ree to contact
US.
Date:
Plan Check # —C Li
Code Compliance Inspector
DIVISION OF TECHNICAL REVIEW DIVISION OF INSPECTION & COMPLIANCE
366-33-903 a.m. 5 p.m. ac?8-32TH 8`a.m. - 9 a.m.
DIVISION OF DIVISION OF DIVISION OF
INFORMATION SERVICES TECHNICAL REVIEW INSPECTION & COMPLIANCE
-A lc4e, i
11
-0
va u, o, P: r,- Fcft�.TA- C.. - I F-
--r- M, e-ex,�Ts. 'r . .4 5 Jq (on
—I I M A-TMI=�
USC-
--7 -7 8
-761
IkEuk.4j.& .-VED
MAR 0 5 1991
PUCOUNTER
COMMUNITY VIEVELOPMENTI
PRESUBMITTAL CONFERENCE REVIEW FORK
2. /--S31
T R
1 .
DATE
3.
DEVELOPER NAME
ADDRESS
TELEPH ONE
—7-74
4.
REPRESENTATIVE NAME
I e—u&r— I>
ADDRESS
TELEPHONE
5.
NAME OF DEVELOPMENT
6.
TYPE OF DEVELOPMENT
SIZE 42400s-
7.
LOCATION.OF SITE
VX" C�4 C?'S. k.0
8.
COMPREHENSIVE PLANNING
AREA 35Nk>p'e>
m I
i
9.
DEVELOPMENT'S ROAD SYSTEM
(TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMATION PROVIDED BY THEDEVELOPER:
3 A TRAFFIC STUDY IS NOT REQUIRED
(THE DEVELOPER 14AY CHOOSE TO PERFORM A TRAFFIC STUDY.HOWEVER TO SHOW THAT THE PROPOSED DEVELOPMENT DOES NOT
PLACE THREE OR MORE PEAK HOUR TRIPS THROUGH A SPECIFIC LOCATION)
I
I I
COMMENTS:
A TRAFFIC STUDY IS REQUIRED
(SEE TRAFFIC STUDY CHECKLIST C-4200-2 FOR SPECIFICS)
A REGIONAL TRAFFIC STUDY MUST BE COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE PROCESSED
(SEE REGIONAL TRAFFIC STUDY CHECKLIST C-4200-5 FOR SPECIFICS)
-T,t,4vL
v �-j
ej "� A\ dA ko
Wtcurl,w ? LAL t
. uttwil,14
PUBLIC WORKS
January 29, 1991 PAGE 1 OF 2 Checktist C-4200-1
11. BASED ON INFORMAT16N PROVIDED BY THE APPLICANT -AT THE'PRESUBMITTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE FOLLOW-
ING TRAFFIC IMPACTS HAVE BEEN IDENTIFIED AND WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS NEEDED TO DE-
TERMINE IMPACT MITGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
12. OTHER PERTINENT DATA DISCUSSED:
13. DEVELOPMENT APPLICATION REVIEW FEE: S "ve"A&V rt 001y'-O (TO BE PAID AT TIME OF APPLICATION SUBMITTAL)
SNOHOMISH COUNTY DATE FOR DEVELOPER 6ATE
PUBLIC WORKS
January 29, 1991 PAGE 2 OF 2 CheckList C-4200-1
F_
TEGRIS FIRE PROTECTION, INC.
FIRL PROTECTION SYSTEMS
14415 Southeast 128th Street
L RENTON, WASHINGTON 98056
(206) 255-6644 FAX (206) 228-2909
am�
T
0
WE ARE SENDING YOU Attached
the following: 9
R� Shop Drawings E] Specif ications
F1 Prints F1 Plans
LETTM 01: TRANSMITTAL
r-JOB NO. 7
17 _33
DATE Z
ATTENTION
RE:
AWWU yz_,g,-T 10L.4ee,
MWIN
F-1 under separate cover via
E] Copy of letter F] Change order
F� Samples F1
r-COPJES
DATE
NUMBER
DESCRIPTION
4 9D
A-0
C'
fk07,
&VSV&,�Ad V2�
f6V16ti)
2—C-4—
P6cuz?o.
lor-1
Ak&udyaw-rs
-ro L671w-
enr- Ocz:24,
Fri
I
I
I
TH,ZTRANSMISSIONS ARE:
For your approval
r your use
Asper your request
For your review and comment(s) El
FORBIDS DUE 19—
Approved as submitted
Approved as noted
Corrections noted
E]
Resubmit with —_ copies for approval
Submit copies for distribution
Return corrected prints
PRINTS RETURNED AFTER LOAN TO US
r- REMARKS:
Excli, P-&�s r
5 IkOR-17EP 12-�v BA) 11/301
e4r, e2_e_111_0k 51 14a A got (J'a— e14 0 —Y
/7
COPY TO:
16.
SIGNATURE: Vo -7
1 1%6dlr"z�
FORM 705-3 'MCJEE - 1055 EAST STATE ST. - ATHENS. OHIO 45701
To Reorder Call Toll -Free I-WO-526-1272
IF ENCLOSURES ARE NOT AS DESCRIBED, PLEASE NOTIFY US IMMEDIATELY
LETT* OF TRANSMITTAL
T91131RI9 F"IRE PROTECTION, INC.
FIRL PROTECTION SYSTEMS
14415 Southeast 128th Street
L RENTON, WASHINGTON 98056 1
(206) 255-6644 FAX (206) 228-2909
Z! 00 M.; T. NJ
T 60*jfitL)A)jE\j
0 4*TbL Rmj& CDowni AOJIA)jjr?� 61-D6
C-VF'�M-rl 1 W4. Tezol
W= Al2C QCtinimi-a vn" 1--�
the following: ,Aftacle, F] under separate cover via —
F� Shop Drawings Specifications E] copy of letter Ej Change order
F1 Prints E] Plans [—] Samples El
NO. -Z
DATE
LJOB
T,
A-TTENTION n4 74-
VIZU6 1 POP,? UM
gjw4y qj -Z-r egA_ :;r Stj
.;g�Wkniisit C-7-Y. &JA,,
.10
r`COPfS
DATE � � I
NUMBER
DESCRIPTION
2+91
1 - I -z-
14 Y 14zo CA Gcs .)(e/2o-00 1-7 ZZ4)
3
0 V f -
1Hh5V_ THANSMISSIONS ARE:
6 For your approval
_For your use
Asper your request
E] For your review and comment(s)
[] FORBIDS DUE
F] Approved as submitted
Approved as noted
Corrections noted
Resubmit with __ copies for approval
Submit copies for distribution
F1 Return corrected prints
19 F] PRINTS RETURNED AFTER LOAN TO US
REMARKS:
�C- I,
T%
V
]MLALL
V DLY
V'/
C4-
P, 12 1991
- '_ 1991
UNT
romMUNIITY DEVELOPM IT
"U'x0o,
SIGNATURE:
FORM 705-3 MCBEE - 1055 EAST STATE ST. - ATHENS. OHIO 45701
To Reorder Call Toll -Free 1-800-526-1272
IF ENCLOSURES ARE NOT AS DESCRIBED, PLEASE NOTIFY US IMMEDIATELY
SNOHOMI.SH. COUNTY
Co--mmercial Contact Person Form
YOUR PROJECT FILE NUMBER IS 59,04el
CONTACT PERSON: Thomas K. (Tim) Hall
FIRM: Commercial Design Architects, Inc. (CDA)
ADDRESS: 4230 198th Street SW
CITY: Lynnwood STATE: WA ZIP CODE: 98036
PHONE NUMBER:
SIGNED:
DATED: 12/28/89
Should you have any questions regarding your project or
should you wish to check on the status, you can contact
us at 259-9390 between the hours of 8:00am and 5:00pm
Monday through Friday. Please have your commercial OA
project number available. /n) .'It
YKV J
1�4nv<t
V
COMMERCIAL
P4ESIGN ARCHITECTS, INC.
4230 198th Street 8W
LYNNWOOD, WA 98036
(206) 771-2300
TO �boj:jphjA (S4 Cott A21, P-4
Fb a YLTA Ek�_ 0 P_
AO" 1�[S-MAT(ok)
VA9)Z-6 _7T_/ WA4 - -1 (T-2,0 I
LIECIrcIrrE12 W, TMUSEUCTUL
DATE Z
JOB NO.
ATTEN11ON
RE -
Au"
L�" kh) i
WE ARE SENDING YOU U:.6ttached 0 Under separate cover via the following items:
• Shop drawings Prints 0 Plans 0 Samples 0 Specifications
• Copy of letter 0 Change order coh n-z�j A0z.1r'0';,J * (4'l;.1 ,,I, /?Z'L�k
W,qA ,
P02-A4(_r APRir_,�772IAJ
COPIES
DATE
NO.
DESCRIPTION
z 0/0-
IPZ.,9-1,) 104f^/
(
lv�
16
.5�'Jl V
ULU 2
THESE ARE TRANSMITTED as checked below:
X For approval
For your use
0
As requested
-Yf-
For review and comment
0
FOR BIDS DUE
REMARKS
0 Approved as submitted
EJ Approved as noted
0 Returned for corrections
0—
,;e Resubmit --copies for approval
0 Submit —copies for distribution
CJ Return —corrected prints
19 El PRINTS RETURNED AFTER LOAN TO US
COPY
SIGNED:
I.. Gmft, U,. 014 11
PRODUC72402 LI= It enclosures are not as noted, kindly notify us at once.
A.
MEROAL
D
D
INC.
�\R(NA--TS
4230 198th ST. S.W. LYNNWOOD, WASHINGTON 98036 (206) 771-2300,1, FAX: (206) 672-4244
GRAMOR DEVELOPMENT
Aurora Marketplace
Tax Account No.
10/24/89
AMOUNT AMOUNT
OWNER TAX ACCOUNT NO.
YEAR
BILLED
PAID BALANCE
TRACT NO.
Dontos 4519-001-009-0005
1989
3,918.21
0.00 3,918.21
9
Marmsoler 4519-001-014-0503
1989
1,317.06
0.00 1,317.06
2
Chapman
1988
1,066.60
0.00 1,066.60
2
Dawson 4519-001-014-0404
1989
307.01
0.00 307.01
4
4519-001-013-0108
1989
943.98
0.00 943.98
4
4519-001-013-0109
1989
1,061.38
4
Storm 4519-001-007-0007
1989
1,500.22
0.00
10
4519-001-008-0006
1989
1,371.55
0.00
10
4519-001-016-0006
1989
2,771.44
0.00
10
4519-001-017-0104
1989
39.37
0.00
10
4519-001-017-0203
1989
857.47
0.00
10
4519-001-017-0401
1989
238.75
0.00
10
Martin 4519-001-005-0108
1989
1,341.48
0.00
12
4519-001-005-0207
1989
2,585.93
0.00
12
4519-001-018-0103
1989
275.23
0.00
12
Lee 4519-001-015-0106
1989
1,214.07
0.00
6
4519-001-015-0205
1989
827.15
0.00
6
Saadatmandi ,/4519-001-004-0109
1989
1,580.91
0.00
11
1988
1,341.28
0.00
4519-001-004-0208
1989
911.35
0.00
11
1988
907.92
0.00
4519-001-006-0008
1989
1,585.48
0.00
11
1988
1,279.16
0.00
.Hanby 4519-001-014-0305
1989
679.83
0.00
3
Earp 4519-001-017-0302
1989
2,093.92
0.00
5
SNOHOMISH COUNTY OFFICE OF COMMUNITY DEVELOPMENT
4th Floor —Snohomish County Administration Building
Everett, Washington 98201
ADDRESS APPLICATION
TAX ACCOUNT NUMBER
ee
SECTION -TOWNSHIP -RANGE: PLAT NAME: —
SHORT PLAT* AND/OR LOT# IF APPLICABLE:
(If ,P,&r,,ty igv�1yeAja.Iots-tjtus, BLA or access is by private easement please attach vicinity map with parcel
and��_—�hLhi?fff gd!
ACCESS ROAD NUMBER OR NAME:
NAME:
ADDRESS TO VERIFY:
PHONE NUMBER:
e 0-do
-,?/ - 3L3 J'\�
ADDRESS ON EITHER SIDE OF SUBJECT PROPERTY IF KNOWN
OFFICE USE ONLY BELOW THIS LINE
ADDRESS ASSIGNMENT 2 � -3
W
CS'4"h I () 49f
PE AING W14N PER�MIT APPLICATION 0 YES PLAN CHECK NO.
PENDING ACCESS PERMIT 0 YES
CD-17 CDP 4-81/19
SNOHOMISH COUNTY
Cornmercial Contact Person Form
(Ile
YOUR PROJECT FILE NUMBER IS
CONTACT PERSON:
FIRM: Commercial Design Architects, Inc. (C.D.A. Inc.)
ADDRESS: 4230 198th Street SW
CITY: Lynnwood STATE: WA ZIP CODE: 98036
PHONE NUMBER: 771-2300
SIGNED:
DATED: 10-24-89
Should you have any questions regarding your project or
should you wish to check on the status, you can contact
us at 259-9390 between the hours of 8:00am and 5:00pm
Monday through Friday. Please have your commercial
project number available.
JOB
SHEET NO OF
ENGEL INC.
GENERAL CONTRACTORS LIC. =ENGELI 169N3 CALCULATED BY OAT
CHECKED BY DATE
SCALE-
om:
Al,'ubj ect:
Date:
Attach:
Certify:
Forwarded by:
11 MZ"RWW-
Frank Wyckoff@Com-Dev@Snoco
Janet-Little@Com-Dev@SnoCo
Tuesday, June 13, 1995 11:38:04 PDT
N
----------------------------------------------------------------------------
This is to let you know that we have followed normal procedures to turn over
files to the City of Edmonds.
1 8 9 0 - 19 9 - .
May 16,1994
CITY OF EDMONDS LAURA'M. HALL
250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning Parks and Recreation 9 Engineering
EXECLITIVE OFFICE
Dennis Derickson f 0 1995
Snohomish County Planning
3000 Rockefeller
Everett, WA 98201
RE: Parking lot plans, building plans and building uses for commercial buildings in newly
annexed areas
Dear Mr. Derickson:
With the completion of the Aurora Marketplace neighborhood annexation the City now is in the
process of reviewing applications for tenant improvements to the commercial buildings.
Unfortunately we have no information regarding the existing buildings, uses and parking. As
new businesses apply for business licenses and tenant improvement permits, . we must determine
if the particular uses meet the zoning code and the parking requirements. To do this we need to
know what uses were previously located in the buildings, what square footage of the building
any particular use occupied, and how many parking stalls were allocated to that use.
Therefore, the City is requesting your assistance in obtaining the following information if it is -
available: all.d6frimercial building plans—; com me'ribial parking 16-f YrO site plans; .. ind b6ildin� �se
, �" .- . - �� _:i�. I �
infoiffi"a'tioH�: ViF� opi� * '.1 i n'i " " i
h this informat o s available as it W613'ld gir-6idt y assist the City to serve the
n '"Iy annexed areas. If your office is not the correct office for this information, please forward
ew
this request to the proper agency, or notify me as to who to contact.
If you have any questions, please feel free to contact me at 771-0220. The requested information
can be sent to the City of Edmonds Planning Division, 250 5th Avenue North, Edmonds, WA
98020.
Sincerely,
Z.,
John Bissell
Associate Planner
tz�
C. Mary Lou Block
1:\tcmp\jb\files\letters\snoco.doc
0 Incorporated August 11, 1890 *
Sister Cities International — Hekinan, Japan
..COUNTY OF SNOHOMISH — COMMUNITY DEVELOPMENT DIVISION
CERTIFICATE OF OCCUPANCY
17—cv I —ao—'l —c/1'06? EXPIRES —
TAX ACCOUNT NO.
OCCUPANT
STREET NO. 11wv qq
bCC. GROUP .2
OWNER USE ZONE
ADDRESS _:V011 �7kf,' 4��.-2 41ww.1,94W TYPE OF BLDG.
BUILDING PERMIT NO. :5-qf a 9.zgg�Fqz
HAS BEEN INSPECTED AND THE FOLLOWING OCCUPANCY THEREOF IS HEREBY AUTHORIZED:
FLOORS
OCCUPANCIES
AREA UNDER
THIS CERTIF.
SQUARE FT.
MAXIMUM
OCCUPANT
LOAD
MAX. ALLOWABLE
FLOOR LOADS
LOS. PER SO. FT.
_T_
Z215,7 <2�<_
REMARKS
CODE COMPLIANCE INSPECTOR: DATE 16
BY:
Building Official
POSTING: The Certificate of Occupancy shall be posted in a conspicuous place on*the premises
and shall not be removed except by the Building Official.
CO-2
SrM TNSPE(�MON Ej OK El Bonded Improvements Bonded Drainage
.... .........
e ep one.,:
e FT
OPERAIIONS- oK.' -Bonded
E Un-
1 -=7.
e, I i `e
T n
% e:
7FJ�M_ QDPW El OR 11 Bonded
elepnone*
a e ::i*,., 0'
T
TEMP D 30 Day 90 DaY 11120 Day
FINAL
11
Y.S1 TEM
0
Ducr oijpi�-v-- w I"
, - 1;
OIL
6 P p
56
SUBJECTTO FIELD INSPECTIGNS, CGOR ffr-T-r*
IS1014S nF PLAN CHMK
71
-7,4M EXAMINER, BUILDING DEPAR—fM—M'-
SWHMM cnffNTY
Aurora Marketplace
EXHIBIT `A-2'
LEGAL DESCRIPTION
That portion of Lots 4 through 18, block 1, plat of Fruitland Acres to Lake Ballinger, according
to the plat recorded In volume 10 of plats, page 47, records of Snohomish County. Washington
lying west of the westerly margin of Pacific Highway (Highway 99 North), north of the
northerly margin of 238th Street S.W., south of the so6therly margin of 236th Street S.W. and
east of the following described line:
Beginning at the Intersection of the west line of the east 120.0 feel of lots 9, 10 and 11 of said
block I of said plat with the south margin of 2361h Street S.W.; thence south along said west
line to the south line of said lot 11; thance west along said south line a distance of 70.0 feet to
intersect the west line of the east 190.0 feet of lots 12, 13 and 14 In said block I in said plat;
thence south along said last named west line to the north margin of 2381h Street S.W. and the
terminus Of said described line.
SNOHOMISH CO.UNTY
Commercial Contac.t Person Form
'd4-P
YOUR PROJ CT FILE NUMBER IS
.CONTACT*PERSON:
FIRM:
C9106264
ADDRESS q 2-
T (A'�9
CITY: S ATE ZIP CODE:
-PHONETUMBER:
SIGNED: DATED:
Should you have any questions regarding your project or
should you wish to check on the status, you can contact
us at 388-3390 -between the hours of 8:00am ind 5:00�ni
Monday through Friday. Please have your comercial
project nunber available.
0
0
June 28, 1991
Snohomish County
Community Development
4th Floor, Administration Building
Everett, Wa 98201
Attn: Vi'cki Nulle
GRAWHIC -1 Re: DryClean U.S.A. sign permit.
X Dear Vicki,
DISPLAY
SIGN COMPANY Thank you so much for allowing me to send in this application
rather than bringing it in.
14 505 N. E. 9 1 st Street
Redmond, Washington 98052
206/441-2070
206/869-5273
FA)< 206/869-5439
I have corrected all that we had discussed (enclosed on
drawings). The only problem I came across was with the
scale on the site plan. The landlord did not have an
original, and said that my copy had been reduced and enlarged
many times. I have ordered an original copy, and sent
someon : e down to measure the store frontage (also on drawings
enclosed).
I hope this is sufficient for applying. If you have any
questions, please feel free to call me at (206) 441-2070.
Once again, thank you for working with me on this, it
has saved me a lot of time.-
S i n c e r e 1 y ,
JUWXJ�
Judi Martinez
Office Manager
JRM/im
enclosures
Mr. Donald Penn
CHEC Medical, Inc.
2600 Michaelson Dr., #1130
Irvine, California 92715
Re: Aurora Marketplace - Tenant Signage
Dear Don:
We have been allotted by Snohomish County, the reviewing� governmental agency, a
certain square footage of signage for the entire project. Your portion of the allotment is
84, which must be a consideration of your sign design in addition to the design
parameters of Exhibit 'C' - Sign Criteria" in the Lease.
We also remind you that according to "Section 11 - Signs of the Lease, Landlord is to
review and approve the signage prior to sign construction and installation.
I understand that occasionally Snohomish County requires the - sign permit submittal plan
sets to be signed off by the Landlord. as approved before the sign permit application is
accepted, so you can see it is extremely important for you to obtain Landlord's approval.
We look forward to working with you, and if you have any questions, feel free to call.
Sincerely,
GRAMOR DEVELOPMENT N.W., INC.
Anne Kleinheinz
Marketing
AK:kp
enclosure
A
(CNRAHAM 4211 200TH ST. S.W./ SUITE 202 /LYNNWOOD, WA98036 (206)774-0098 FAX (206)672-0622 C'u-0
SAN DIEGO C-;,�
SEATTLE / PORTLAND / LAS VEGAS
June 20, 1991
Mr. Donald Penn
CHEC Medical, Inc.
2600 Michaelson Dr., #1130
Irvine, California 92715
Re: Aurora Marketplace - Tenant Signage
Dear Don:
We have been allotted by Snohomish County, the reviewing governmental agency, a
certain square footage of signage for the entire project. Your portion of the allotment is
84, which must be a consideration of your sign design in addition to the design
parameters of Exhibit 'C' - Sign Criteria" in the Lease.
We also remind you that according to "Section 11 - Sia ns of the Lease,, Landlord is -to
review and approve the signage prior to sign construction and installation.
I understand that occasionally Snohomish County r6quires the sign permit submittal plan
sets to b * e signed off by the Landlord as approved before the sign permit application is
accepted, so you can see it is extremely important for you to obtain Landlord's approval.
We look forward to working with you, and if you have any questions, feel free to call.
Sincerely,
GRAMOR DEVELOPMENT N.W., INC.
Anne Kleinheinz
Marketing
AlK*p
enclosure
A
ttFRA,HAJ4 4211 200TH ST. S.W. /SUITE 202 /LYNNWOOD, WA96036 (206)774-0098 FAX (206)672-0622
SEATTLE / PORTLAND i LAS VEGAS SAN DIEGO
L.-
Sn
e& V! ' � ; ' v: ' - C'ne:c
SNOHOMISH �COUINTY
Co*mmercial Contact Person Form
CONTACT PERSON:
YOUR PROJECT FILE NUM . BER IS 0106265_ .
k ) AJ E-
J— &
FIRM: At,/4�7 L ai�� f AJ rS�X #4, -1,6 Alk L
ADDRESS: 37A) aae- --AV-1
CITY: STATE: ZIP CODE: qp.2
PHONE NUMBER: & -6 fl- 0 IF 1171 /
SIGNED:
DATED:
elf - —P LW
Should you have any questions regarding your' projector
should you wish to check on the status, you can contact
us at 388-3390 - between the hours of 8:00am and 5: OOpm
Monday through Friday. Please have your commercial
project number available.,
. / . ` J1J/V 19
91
0
0
SNOHOMISH COUNTY DEPARTMENT OF PUBLIC WORICS
PRESUBMITTAL CONFERENCE REVIEW FORM U9106265;
THIS BOX FOR COUNTY USE ONLY
NOTICE TO CDD COUNTER STAFF AND PERMIT APPLICANT:
The following items are required with your permit application:
[X] This form must be submitted with the application
A traffic study must be submitted with the application
A traffic study is not required
A Development Application Review Fee must be paid $
A Development Application Review Fee is not r,oquired
Route application to DPW for review
Do not route application to DPW
199,
1 DATE 2. S T
3. DEVELOPER VIDVkAR
4. REPRESENTATIVE %P0LTUV1a S�-
5. NAME OF DEVELOPMENT. -I" M K4a-C42- -
6. TYPE OF DEVELOPMENT SIZE �X()Cto (,0%,\.ATL&Cz
7. LOCATION OF SITE n
8. COMPREHENSIVE PLANNING AREA
9. DEVELOPMENT'S ROAD SYSTEM (TSA)
10. BASED ON THE NATURE OF THE DEVELOPMENT, ANY EXISTING INFORMATION AND SUPPLEMENTAL INFORMATION PROVIDED BY THE
DEVELOPER:
X1 A TRAFFIC STUDY IS NOT REQUIRED— T4-
(The developer may choose to perform a traffic study, however,lto show that the proposed development does not
place three or more peak hour trips through a specific location)
I A TRAFFIC STUDY IS REQUIRED
(See Traffic Study Checklist C-4200-2 for specifics)
I A REGIONAL TRAFFIC STUDY MUST BE COMPLETED BEFORE DEVELOPMENT APPLICATION CAN BE PROCESSED
(S R I T ff' Study Checklist C-4200-5 for specifics)
C—
qj
SNOHOMISH COUNTY DATE FOR DEVELOPER 45ATF
REVISED MARCH 7, 1991 PAGE 1 OF 2 CHECKLIST C-4200-1
YELLOW COPY - APPLICANT PINK COPY - DPW FILE
11. BASED ON INFORMATION PROVIDED BY THE APPLICANT AT THE PRESUBMITTAL CONFERENCE FOR THE PROPOSED DEVELOPMENT, THE
FOLLOWIkG TRAFFIC IMPACTS HAVE BEEN IDENTIFIED AND WILL REQUIRE IMPACT MITIGATION. IF ADDITIONAL INFORMATION IS
NEEDED TO DETERMINE IMPACT MITIGATION REQUIREMENTS, IT WILL BE INDICATED BELOW.
12. COMMENTS/OTHER PERTINENT DATA DISCUSSED:
ra,
SNOHOMISH COUNTY
I d - Igwd /4'x
/4f /L
DATE FOR DEVELOPER DATE
REVISED MARCH 7, 1991 PAGE 2 OF 2 CHECKLIST C-4200-1
YELLOW COPY - APPLICANT PINK COPY - DPW FILE
91
0
COMMERCIAL PERMIT
CONDITION PAGE
COMMERCIAL PERMIT NO. -1/yz
TAX ACCOUNT NO.: 4519-001-004-0109
APPLICANT: BRADLEY-SISK ENTERPRISES DBA TRAVEL AGENTS INTERNATIONAL
SITE ADDRESS: 23632 HIGHWAY 99, EDMONDS, WA
COMMERCIAL APPLICATION NO.: C9106265
CONDITIONS TO BE SATISFIED PRIOR TO OCCUPANCY
SITE:
1. BUSINESS IDENTIFICATION SIGN(S) SHALL REQUIRE SEPARATE PERMITS
AND BE SUBJECT TO SCC TITLE 18.44.040 AND THE APPROVED SIGNAGE
ALLOTMENT FOR AURORA MARKETPLACE DATED 9-6-90.
COMMENTS - CALL RON ALLDREDGE AT 388-3390.
0 C9106224
J U N 0 5 1991
PC/COUNTER
COMMUNITY DEVELOPMENT]
March 15, 1991
Mr. Bill Gore
Superc ' uts, Inc.
1080 Esplanade Place
Walnut Creek, California 94596
Re: f I Aurora Marketplace - Ten -ant Signage,
Dear Bill:
We have been allotted by Snohomish County, the reviewing governmental agency, a
certain square footage of signage for the entire project. �Your portion of the allotment is
40 s.f., which must be a consideration of your sign design in addition to the design -
parameters of Exhibit V - Sign Criteria" in the Lease.
43 , I
We also remind you that according to "Section 11 - LaW of the Lea, e Land ord is to
review and approve the signage prior to sign construction and installation.
I understand that occasionally Snohomish County requires the sign permit submittal plan
sets to be signed off by the Landlord as approved before the sign permit application is
accepted, so you can see it is extremely important for you to obtain Landlord's approval.
We look forward to working with you, and if you have any questions, feel free to call.
Sincerely,
GRAMOR DEVELOPMEN-r N.W., INC.
Richard Embry, Project Manager
RE:kp
enclosure
tigRA HA W, 421 1 200TH ST.S W / SUITE 202 LYNN1-,'0,X'.WA98C3C- 1(20e.)774-0098 FAX(206)(572-062,'
F ')F;-. L 4%. LA�, VfCL5
K SAN DIEGO
,0(5( ", - *
I LLI
LS
WIN
Od
-iG; '6 L
3s
-Ica.
C.X-ICC-L
-Sol
-Gas--' ca
vVA vis".
I wo I