23715 84TH AVE W.PDF11 lill 111111
7975
23715 84TH AVE W
0
ADDRESS: �tj D-:3 111,5 cD— 3'� 1 —7 S (4 A
TAX ACCOUNTIPARCEL NUM13ER: 4 0 C?-cr-D
BUILDING PERMIT (NEW STRUCTURE). 0 1
COVENANTS (RECORDED) FOR:
CRITICALAREAS: —DETERMINATION: [] Conditional Waiver 0 Study Required Waiver
DISCRETIONARY PERMIT #'S:
466 cla-ol 7
DRAINAGE PLAN DATED:— 1 g. I ) (1.1 q q
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
PERMITS (OTHER):
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
SEWER LID FEE S:
SHORTPLAT
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S).#:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT
WATER METER TAP CARD DATED:
OTHER:
LID ff:
LOT: BLOCK:
9 9 5
�V h2> LIL',;-:�? -:9 3(L9--(f
LATEMP\DS'rs\Fornis\Street File Checklist.doe
C. o QJ
City of Edinonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT Permit Number.
Wue Date: C1
A. Address or Vicinity of Construction: Z3171 3JZ-3-715- 13 4 11� Ale- tA)'
B. Type of Work (be specific): PER- 14L�P_>APn&-,eD
C. Contractor: Kjew��UoJL.P_., Lkh I th 1!,Scontact: q�)1-40
_UF
Mailing Address-. C) 1276--4 1116011 Phone: * <, L4 S, I C� 2, 1 L
State License #: Oor—KN" 01 Liability Insurance: Bond: $
D. Building Permit # (if applicable)
E. El Commercial E] Subdivision
D9 Multi -Family E] 'Single Family
INSPECTOR: rrouqr—
F. Pavement or Concrete Cut: Yes
Side Sewer Permit,# (if applicable):
1,
W,
�,I�ity Project ''0' Utility (PUD', GTE, WNG, CABLE, WATER).
F1 Other
114SPECTOR:
[]No G. Size of Cut: x H. Chargq�_$
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmlessfrom injuries, damages, oi� claims ofany
kind or description. whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, oranv bf its departments or
employees, including �r not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of granting. this per M"It.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREETPATCHIS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR.CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT i
Two sets of construction drawings of proposed work required with permit application.
A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220,
Work and material is to be inspected during progress and at. completiona
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffi6 Control and Public Safety shall be in accordance with City regplffions as required by the City Engineer.
All street cut tretich work shall be patched with asphalt or. City approved material prior to the end of the working day;
NO EXCEPTIONS.
I have read the above statements and understand the permit requirements and the pink copy of the permit will be
available on siteat all times for inspection purposes.
4 ',Signature:
Date:
(Contractor or Agent)
CALL DIAL. -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY. 6?C14 -
TIME AUTHORIZED: VOID AFTER DAYS
SPECIAL CONDITIONS: PC1Z.__APPo9o,1+'D
RIGHT OF WAY FEE:
DISRUPTION FEE/FUND I 11:
RESTORATION FEE:
T OTAL FEE: -
RECEIPT NO.:
ISSUED BY:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div 1997
FIELD INSPECTION NOTES
I Comments:
I Diagram.
(Fund 111 - Route copy to Street Dept.)
CONTRACTOR CALLED FOR INSPECTION E] YES NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
LICENSE DETAIL INFORNWION Form
Page I of I
STATE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES
Specialty Compliance Services Division
P. 0. Box 44000 Olympia, WA 98504-4000
TBE RESULT OF YOUR INQUIRY FOR LICENSE NUMBER SELECTED IS:
LICENSE DETAIL INFORMATION
Current Filter: None
Registration# or License NORTHU*1 01 MZ
Name
NORTHLAKE UTILITIES
Address
PO BOX 1691
Address
City
WOODINVILLE
State
WA
Zip
98072
Phone Number
4254819212
Effective Date
7/9/90
Expiration Date
7/19/99
Registration Status
ACTIVE
Type
CONSTRUCTION CONTRACTOR
Entity
CORPORATION
Specialty Code
GENERAL
Other Specialties
LIBI Number
601245642
* * *VIEW PRINICPAL OWNER(S) FOR THIS LICENSE* * -
* * *VIEW CONTRACTOR BOND/SAVINGS INFORMATION * * *
* * THECK INQUIRY FOR SUMMONS AND COMPLAINTS* * *
* * * VIEW CONTRACTOR INSURANCE INFORMATION * * *
New inquiry by CITY, NAME, PRINCIPAL OWNER NAME, NUMBER, UBI NUMBER or
return to the L&I Construction Compliance Home Pag
http://www.Ini.wa.gov/contractors/TF2Form.asp?License=NORTHU*IOIMZ 3/5/99
4"i .
in - -ocj
C. I's
-City of Edmonds
RIGHT-OF-WAY CONSTRUCTION
PERMIT Permit Number.
Issue Date: C)q
A. Address or Vicinity of Construction: Z--*' 7 111 Z-6-7 12; B SrM IOHQ_��
B. Type of Work (be specific)-7:6-P, ckzk�a�j
C. Contractor: Contact:
Mailing Address: q (9 S"� Phone:
State License #: L RW 0 Liability Insurance: Bond:$
D. Building Permit # (if applicable):
Side Sewer Permit # (if applicable):
E. n Commercial El Subdivision El City Project EJ Utility (PUD, GTE, WNG, CABLE, WATER)
Multi -Family EJ Single Family Other
INSPECTOR: rCCA.&-1,
INSPECTOR:
F. Pavement or Concrete Cut: 0 Yes E]No G. Size of Cut: x H. Chargq�,$
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmlessfrom.injuries, damages, or cl6i ; mi�of any
kind or description whats oever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or
employees, including or not limited to the defense of any legal proceedings including defense costs and atiorneyfees by reason of granting thi s permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC-
TION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WffL`BE HELD -UNTIL THE FINAL STREETPATCHIS COMPLETED
BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT . .
Two sets of construction drawings of proposed work required with permit application.
A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street'shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with, City regulations as required by the City Engineer.
All street cut trench work shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS:
I have rea ' d the above statements and- understand the permit requirements and the pink copy of the permit will be
available on site at all timesfor inspection purposes.
Signature:
Date: -9 9
or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: nvt'� !2
0J,
TIME AUTHORIZED: VOID AFTER Ve 6�_� DAYS
SPECIAL CONDITIONS:
RIGHT OF WAY FEE:
DISRUPTION FEEIFUND I I I
RESTORATION FEE:
T OTAL FEE: 5-C
RECEIPT NO.:
ISSUED BY:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div 1997
FIELD INSPECTION NOTES
Comments:
Diagram
CONTRACTOR CALLED FOR INSPECTION
Partial Work Inspection by P.W.:
Work Disapproved By:
FINAL APPROVAL BY:
(Fund 111 - Route copy to Street Dept.)
13 YES
Date:
Date:
El NO
'b,
Date:
To:
From:
Subject:
MEMORANDUM
December 23, 1998
Don Fiene, Hydraulics Engineer
Jamal Mahmoud, Traffic Engineer
Gordy Hyde, Development Services Engineerl?��'
Building Permit Application for Ofteson at 23713/5 — 84" Ave. W.
(ADB-98-17) (Plan Check 98-323)
The Building Division received the attached revised building permit
application information today. I included your latest plan review mark-ups and/or
notes for your information. If you need more information, please check with me,
as I have the ADB file and earlier correspondence with the applicant.
Please review and return your comments to me as soon as possible so I may
prepare review correspondence no later than January 5. Your cooperation in
initiating a prompt review and a rapid response is appreciated. Thank you.
CITY OF EDMONDS
ENGINEERING DIVISION
b8323b.doc
ft
-0
MEMORANDUM
Date: January 5, 1999
To: Gordy Hyde, Development Services Engineer
From: Jamal Mahmoud, Traffic Engineer � M
Subject: Building Permit Application for Otteson at 23713 — 84th Ave W. (ADB 98-
17) (Plan Check 98 — 323)
In order to complete the review of your building permit application, the following
traffic issues should be addressed:
The school bus stop sign could be located to the north only. Please coordinate
with Community Transit.
City of Edmonds
..................
Community Services Department
Engineering Division
City of Edmonds
RIGHT-OF-WAY CONSTRUCTION PERMIT*
A. Address or Vicinity of Construction:—`
Permit No: Y7
Issue Date:
B. Type of Work (be specific): PERMIT REQUEST TO INSTALL A 1-1/4". PLASTIC PIPE — GAS MAIN IN
84 AVE W TIE INTO EXISTING MAIN AT + 3001 N, 121 W OF THE CENTERLINE OF 84TH AVE W &
238TO ST SW AND EXTEND 50' EAST TO SERVE TARGET,
C. Contractor: PUGET SOUND ENERGY
Mailing Address: 1122 75TH SW EVERETT
Contact: DOLJ4 USITALO
Phone: 425-356-7520
State License #: -Liability Insurance: Bond- $
I/ — 9 * 9
D. Building Permit # (if applicable): Side Sewer Permit # (if applicable):
E. Commercial Subdivision EUC (PUD, GTE, PSE, CHAMBERS, OVWD)
[—] City Project
Multi -Family Single Family Other
INSPECTOR.
F. PAVEMENT: El YES Dfl NO G. SIZE OF CUT x H. Charge: $
CONCRETE CUT: YES' W NO
APPLICANT TO READ AND SIGN
IDEMNITY. Applicant uind&stands by his/her signature to this application helshe holds the City of Edmonds harmlessfrom injuries,
damages or claims cfany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including but not limited to the defense of any legabp�o'ceedi�gs including defense costs and
attorneyfee§ by reasotfi5fgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS
COMPLETED BY CITY FOOCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT.
* Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every
hagger must 'be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the
required training in their possession.
+ Restoration is�to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -
approved material prior to the end of the workday — NO EXCEPTIONS.
* Three sets of construction drawings of proposed work are required with the permit application.
IHAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE
THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS
FELMA H LOPEZ—FUGUIAO
Signature: Date.
(Contractor or Agent)
8/31/99
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
Approved by:
Time Authorized: Void After 0
Special Conditions: C 044
o� fe, ve L,, � e 6 , 4—
E ONLY
Right-of-way Fee:
Disruption Fee/Fund 111:
Restoration. Fee:
Total Fee:
Receipt No:
issued byl.
UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL
INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS
COMMUNITY DEVELOPMENT CODE. '
FINAL APPROVAL.OF PERMITTED WORK.
INSPECTOR'S SIGNATURE DATE:
For inspection requirements see Engineering Information Handout.
: I
236th ST. S.W.
I
. PAY.
W ID
C?
co
r- CD
'0
Re
4" CONDUIT
TIE-IN a + 300 ' N, 12' W
(2 x 1-1/4" TAP TEE)
1-1/4" PE IP t 300'N CL
3 MTR MANIFOLD
PROPOSED 1-1/8" SERVICES
END MAIN i 38'E, t 300'N CL
23715
3 MTR MANIFOLD
N
cy)
E-
C�
10
01 t- ;0
oo
238th T. S.W.
F
NOTES:
1. CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555
CITY OF EDMONDS:
Maintain a minimum of Whorizontal
and 3' vertical clearance from all
city utilities and appurtenances.
Cuts in paving are shown as
_Aq_ cuts in paving anticipated.
Notify Engineering Division 24 hrs
prior to construction - 425-771-0220
PROJECT MANAGER: DOUG USITALO - 425-356-7520
4" CONDUIT TO BE INSTALLED 300' NORTH OF THE CENTERLINE OF 238 ST. S.W.
GAS MAIN INSTALLATIONRETIREMENT
I R
SIZE
L
N.GTH
TYPE
JURER
11/ 4 /1
50'
MPE
CALL 1-800-424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIC CVE"TrU NinT Tn Pi: Ppiipn iipnN FnR FXACT IOCATION OF FACILITIES
5
REAL ESTATE/EASEMENT
-------------------------
PERMIT
EDMONDS
-----------------------
4
--
--------
----------------------
3
FUNCTION
NAME
PHONE NO
DATE
2
PROJECT MGR:
D.USITALO
(425 .) 356 -7520
08/30/99
ENGINEER:
-----------
--------
--
REV#
DATE
BY
DESCRIPTION
DRAWN BY:
C.S.
--------
08/30/99
COUNTY
IMER SEC
Work Center
_NSNHG_
CHECKED B Y:
T M
W_ ---
--- --------
F_ /V —
-Iqq
APPROVED BY:
(J��) � 5 �- 7 5)0-
(j / JO/
1/4 SEC
SE - 31 - 27 - 04
OP MAP
164.68
PLAT MAP
167.69 - -
-------------
-----------
--------
--
-------------
-----------
--------
--
U-MAP# (POWER
CIR MAP#
CIRCUIT#
-------------
-----------
--------
--
MAPPING:
------------
JOINT FACILITIES ARRANGEMENTS
UTILITIES-------------------
--------------------------------------
------------------
CONTACT---------------------------------------------
------------------
PHONE#
----------------------------------------------------------
------------------
1-1/4" PE IP- MAIN EXTENSION TO
PUGET SERVE: 23713, 23715 64 AVE. W.
SOUND
ENERGY PRELIMINARY ONLY
Nnt for Construction
INCIDENT#
- - - - - - - - - -
DRAWING#
107006825
----------
SAP SUPERIOR ORDER#
107006825
----------
SCALE: 50 1�