23916 HIGHWAY 99.PDF11111111111111
14079
23916 HIGHWAY 99
CITY OF EDMONDS
PUBLIC VICM - EMINIMING
C� - -: - , , I "r ' -,", 7---- " . I'll
ACTIC)��EkRn,,
2675 -
SUSPENSE DATE:
Date: Time: File #
Attachments: =Yes
SUBJECT: =No
REQUESTOR: NAME: Aa� u - a /0�u 4141W Mu
ADDRESS: v Q,:s 9,1(4
REQUEST RECEIVED BY: PHONE: 22k,?v51q
TELEPHONE
CONTACT IN OFFICE
OTHER:—
i � A -
RECEIVED BY:
MITF Tn
.
M
All Concerned Notified =
Action Completed/File MERL—
EDA,
Purpose of Checklist:
Ank A&
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the
environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all
proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide
information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it
can be done) and to help the agency decide whether an EIS is required.
Instructionsfor Applicants.
This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS Answer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your -knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or
if a question does not apply to your proposal, write "do'not know" or does not apply". complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions
if you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if
there may be significant adverse impact.
Use of checklistfor nonprojeetproposals.
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION,
complete the SUPPLENIENTAL SBEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as
"proposer," and "affected geographic area," respectively.
A. BACKGROUND
1. Name of proposed project, if applicable: _6-P4%QEA1 WLX57- OOTL-rL AvSkF-Y
2. Name of applicant: ED4JA90 10CW0&R
3. Address and phone number of applicant and contact person:
FIX-4- M 1111W Mi�6t'YIWTPW�
Page I of 24
CHKLT.D=t-NOV-93
MASTEMPEA
4. Date checklist prepared: e7 01 IR
S. Agency requesting checklist: City of Edmonds.
6.
Proposed timing or schedule (including phasing, if appl.icable): A61le-DI /-
Al.
(STAFF COMMENTS)
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
r-0 UNI7'A0,01V,—QA IPKI
rlo-- ..' ' -5'Z1-1Vd-8(jno14
71f )7—
'3 WIV-1 .14 6&6ST--,'�oon j,-roa4a Ba')&01Wd-"
(STAFF COMMENTS)
S. List any environmental - information you know about that has been prepared, or will be prepared, directly related
to this proposal.
(STAFF COMMENTS)
9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by your proposal? If yes, explain.
A/0
(STAFF COMMENTS)
CHUTDOMI-NOV-93 Page 2 of24
MASrER%SPFA
0
0
10. List any government approvals or permits that will be needed for your P Tr proposal, if known.
A10AAS
(STAFF COMMENTS)
11. Give brief, complete description of your proposal, including the propo!oqposed uses and size of the project and site.
There are several questions later in this checklist that ask you to descrilh:ribe certain aspects of your proposal. You
do not need to repeat those answers on this page.
M077CL IcWO / 5 - , 55 �fc/ f er5 -7,
OF Fk45 5/7-G- / 5 PG-VEI-Oja�S-o 4JI774r-g )
A 1.4 J (r-- A 2) 7-,4t- Q.E ?- 157 -2ULs-5 7' IQ cow - w S PL u f -4 "IVA, &$,-4r4 VA) ( T
,�Fx/ 5, ZZ6(6- .44t ZZL t-� y 6 - 30 Xg-Ae—S n QLQ Z;5ZE7 Afiz-ckJz�AI-Al 62C
Z :5 J r-1edZF-- 57A,-V 0 /W 6- 5 7-0 9,-/ ZI? 1,)IVI 7' 7' 41*VAe�< APW-71W 9627'
13u1LV11V4- AiLx-k-,
-/ RiEL-A772� PAPXIHC-
AAI 0 LAN 0.5 CAPIW6—
(STAFF COMMENTS)
12. Location of the proposal. Give sufficient information for a person to - oto understand the precise location of your
proposed project, including a street address, if any, and section, townslannship, and range, if known'. If a proposal
would occur over a range of area, provide range or boundaries of the sitefiesite(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you z atu should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitTtimifted with any permit applications related
to this checklist. I
.&W.Re5 5 Z !2Z 6, eALk�f AJ2A�24, TH606,14 &47 7-Z)
414:72H A V(-=- /I
':'TS7A/ � R
(STAFF COMMENTS)
Page 3 of 24
:HKLT.DOC\I-NOV-93
VAMR\,SPRA
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one):(EDrolling, hilly, steep slopes, mountainous other:
- TH 5-: 'S-111 4-LA 9 K r,--W-r L�-( U '��12 A'�, PA42k-I Ob A;ZP A e, ov �, r �-o
11") 1 1�4 6qV"EL., AtJr? A6PHAI.1- -24i- S.0-F, 16
r;%1L-121kjG'5 ot'i TWO 4A"
(STAFF COMMENTS)
b. What is the steepest slope on the site (approximate percent slope)? 10 0 T Ot.,
I\A O-L-t- ro Z W r-
,,,,4,rZ
(STAFF COMMENTS)
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you
know the classification of agricultural soils, specify them and note any prime farmland.
4, st g, 1, A 0 r) A,�;,r-i4 A�--r rov r-,&z z:�, i 'a A,, L- -r
rpooasL-e- wr 7z sov2pAce--
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
00
(STAFF COMMENTS)
CHUTDON-NOV-93 Page 4 of 24
MASrEMSPRA
e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source
Of fill.
200 CY ot-- 6wL_�21�J& 'z;!i_A6 .
A- Q P . rW7_V_ I tj G, 1, 01- L, C) C, A L- a V-- A \1 e_� L, --, LA P P I- J� ;Z
(STAFF COMMENTS)
f. Could erosion occur as a result of clearing, construction, or use? If so, gene rally describe.
�J L9, E'L-�f F L-A I
K�r?_ A �JC
(STAFF COMMENTS)
g. About what percent of the sit ' e will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
(STAFF COMMENTS)
h.. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
GIL�1- A-�J�) ngA\/FL-
KJ-TlZ'A KJ e;;, LA�� P,
(STAFF COMMENTS)
�. i� "-I I
a. What types of emissions to the air would result from the proposal (Le.9 dust, automobile, odors, industrial
wood smoke) during construction and when the project is completed? If any, generally describe and give
approximate quantities if known.
�J QCA1r-'�_A0J'F eX
5 Ki Qn/"10
(STAFF COMMENTS)
CHUTD001-NOV-93 Page 5 of24
MASTEMSPEA
0
E
b. Are there any off -site sources of emissions or odor that may effect your proposal? If so, generally describe.
�J to
(STAFF COMMENTS)
C. Proposed measures to reduce or control emissions or other impacts to the, if any:
(STAFF COMMENTS)
3. WATER
a. Surface:
(1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into.
�J C)
(STAFF COMMENTS)
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
-JJ 0
(STAFF COMMENTS)
(3) Estimate the amount of rill and dredge material that would be placed in or removed from surfa . ce
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
0
(STAFF COMMENTS)
CHXLT.DOC\I-NOV-93 Page 6 of 24
MASEMSPEA
0
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
(STAFF COMMENTS)
(5) D oes the proposal lie within a 100-year floodplain? If so, note location on the site plan.
0
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface waters? H so, describe the
type of waste and anticipated volume of discharge.
'5-To IZ �A LAJ Arf LA �j o r— F�, 0 , I o 6-rks' 100
(STAFF COMMENTS)
b. Ground:
(1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
00
(STAFF COMMENTS)
C I HKLTDCOMOV-93 Page 7 of24
MASTEMSPEA
0
(2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals ... ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
(STAFF COMMENTS)
C. Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this
water flow into other waters? If so, describe.
—��-7H L�,-r rLO\/J �-'LAMQr-r-, r-r-oO r7A-IZ�-JM(-, L-�
,A- Q t-2 00 1 L, r) 61
1!,rl C--
CA:I:CA PA��IKJ I�j
(STAFF COMMENTS)
(2) Could waste materials enter ground or surface waters? If so, generally describe.
(STAFF COMMENTS)
I Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
PFODV'�,72 -'rO A-M�QUATe -04E-
-100 Yv,6-12 �Z+ -proWz -:5-ryo�A P,;qg OT.
(STAFF COMMENTS)
CHKLTDOCU-NOV-93 Page 8 of24
MASTEMSPEA
4. Plants
a. Check or circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other.
evergreen tree: fir, cedar, pine, other: OAI�7— -T-12E,9
shrubs
- grass
- pasture
- crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other:
water plants: water lily, eelgrass, milfbil, other:
other types of vegetation:
(STAFF COMMENTS)
b. What kind and amount of vegetation will be removed or altered?
:THAKJ 2000 Sr- or -
(STAFF COMMENTS)
C. List threatened or endangered species known to be on or near the site.
(STAFF COMMENTS)
Page 9 of 24
CHXLT.DCC%I-N0V-93
MASTERWEA
0
d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the
site, if any:
-�znzoe-r6c%kCE CLAW-rW(v AtosjG
'2' H 12 0 5-1) �j J A- tJA E IZO"tj
(STAFF COMMENTS)
5. Animals
a. Check or circle any birds and animals which have been observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle<���other: (—[2oyJx�7
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other:
(STAFF COMMENTS)
b. List any threatened or endangered species known to be on or near the site.
0 H
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
00
(STAFF COMMENTS)
Page 10 of 24
CHXLT.DOOI-NOV-93
MASTERWELA
0
d. Proposed measures to preserve or enhance wildlife, if any:
--- FJOO&
(STAFF COMMENTS)
6. Energy and Natural Resources
a. What kinds of energy (electridl,"natural ga Koil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
HeA 7- /Ou M /0-S ?�`b (E-VE S 729, 00 ty-2 3
(STAFF COMMENTS)
b. Would your project affect the potential use of solar energy by adjacent properties? If so, 'generally
describe.
(STAFF COMMENTS)
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any:
V /�,V 01= 6)
IN 5"Cl 14
(STAFF COMMENTS)
Page I I of 24
CHKUMMI-NOV-93
MASTER\SPeA
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
ArO
(STAFF COMMENTS)
(1) Describe special emergency services that might be required.
Afe'
hy C4MMUA117"'I
7F
(STAFF COMMENTS)
(2) Proposed measures to reduce or control environmental health hazards, if any:
AJOAZE -- "0 A/e-�1-4,77Y 11494-WF
(STAFF COMMENTS)
b. Noise
(1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
IVO ArE
(STAFF COMMENTS)
Page 12 of 24
CHKLT.DOOI-NOV-93
hLAMERWRA
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise
would come from the site.
M4 5 C10,'J 5- 71e(J C77-0 A/ AC T/
C/<
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
/1/0 Al
(STAFF COMMENTS)
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
ZZ) 7'1-16- AJ Od. 6-4-577 ;f -sb C'//I-(. 4,-72 v1 7-/ �FJ
6,5
(STAFF COMMENTS)
b. Has the site been used for agriculture? If so, describe.
(STAFF COMMENTS)
Page 13'of 24
CHKUD001-NOV-93
MASTERWEA
C. Describe any structures on the site.
&0 A/ L57 /A) DQ/R,0Pn7SoV—r
(STAFF COMMENTS)
d. Will any structures be demolished? If so, what?
'A'10
(STAFF COMMENTS)
e. What is the current zoning classification of the site?
&AJ SIeAC� C4 44 M Cd /!R,
(STAFF COMMENTS)
E What is the current comprehensive plan designation of the site?
(STAFF COMMENTS)
g. If applicable, what is the current shoreline master plan designation of the site?
6
(STAFF COMMENTS)
Page 14 of 24
CHKLT.DOC%I-NOV-93
MAMRXSPEA
0
h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
/VO
(STAFF COMMENTS)
i. Approximately how many people would reside or work in the completed project?
(STAFF COMMENTS)
j. Approximately how many people would the completed project displace?
.r
(STAFF COMMENTS)
k Proposed measures to avoid or re uce displacement impacts, if any:
Ato A4-r Y 14 -
(STAFF COMMENTS)
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
C --r 1"5. /1 All) /-Zw r>c I/ $rx") �o 4 P— r-�
f - - Az&�Oy
YC-J1&I01W6 IV7Z5
(STAFF COMMENTS)
Page 15 of 24
CWLTDC01-NOV-93
MASTERWEA
0 . 0
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income
housing.
(STAFF COMMENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-
income housing.
/V OAJ $—;-
(STAFF COMMENTS)
C. Proposed measures to reduce or control housing impacts, if any:
N 0 A. s 4 AO 11V 6�- 7-04-,A0A412q
0 3 /,A/
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
'251
(STAFF COMMENTS)
Page 16'of24
CHXLT.DCC\I-NOV-93
MASTEMSPEA
0
b. What views in the immediate vicinity would be altered or obstructed?
/VO 141* G-5- -
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
Al 6rl-1 slulqEJ
(STAFF COMMENTS)
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
A/ d AJ 6-
(STAFF COMMENTS)
b. Could light or glare from the finished project be a safety hazard or interfere with views?
(STAFF COMMENTS)
C. What existing off -site sources of light or glare may affect your proposal?
Al-0 IJM'
(STAFF COMMENTS)
CHKLT.D=I-NOV-93 Page 17 of24
MASMSPEA
0
d. Proposed measures to reduce or control light and glare impacts, if any:
EA2�11- hAJ 6:- /- 16-1+- 72A] & D9 5 Af/V L.2 7-6 CeEX7-5- A/ n 6�44-AIe-
7-0 Ar67^) A4-07�TL�-, A"—TIL. L16;6L7-1,41Cr- (0')LQ00,-0,I
n 0 CA Z 0 A/ 4 Al 0 0 C/ 6—
(STAFF COMMENTS)
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
(STAFF COMMENTS)
b. Would the proposed project displace any existing recreation uses? If so, describe.'
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
provided by the project or applicant, if any:
(STAFF COMMENTS)
Page 18 of 24
CHKLT,DOL\I-NOV-93
MASMR\SPFA
0 0
13. Historic and Cultural Preservation
a. Are there any places or objects fisted on, or proposed for, national, state., or local preservation registers
known to be on or next to the site? If so, generally describe.
wqot;';� LOOVA
(STAFF COMMENTS)
b. Gener i ally describe any landmarks or evidence of historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
0 0
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts, if any:
(STAFF COMMENTS)
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing street
system. Show on site plans, if any.
(STAFF COMMENTS)
Page 19 of 24
CHKLTDOCU-NOV-93
MASTERWEA
b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit
stop?
00
(STAFF COMMENTS)
C. How many parking spaces would the completed project have? How many would the project eliminate?
Al-ci
(STAFF COMMENTS)
d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not
including driveways? If so, generally describe (indicate whether public or private).
(STAFF COMMENTS)
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
(STAFF COMMENTS)
Page 20 of-24
CHUTDOMI-NOV-93
MASTEMSPEA
f How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur.
ON A/ IV 0 r-V AJ — 72,0 4-/ /IF--/ C 60 Al S UC— =/�� IV / e�
111JFo7i4?mA7-1,4A-J
(STAFF COMMENTS)
g. Proposed measures to reduce or, control transportation impacts, if any:
�-J 0 �-J �'�
(STAFF COMMENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection., health care, schools, other)? H so, generally describe.
(STAFF COMMENTS)
b. Proposed measures to reduce or control direct impacts on public services, if any:
- QD�Je' -
(STAFF COMMENTS)
Page 21 of 24
CHKLT.DCOI-NOV-93-
MAVERWEA
16. Utilities
a. CirdX _utilities currently available at the site: ������fuse �servic�e��
ii;r
(—sanitarY er�,septic system, other:
(STAFF COMMENTS)
b. Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
C'ITY 'nt� RVMVK)r-w-,
Ry �Z� - cowgrrcr N 44A S,'r. VJ
(STAFF COMMENTS)
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to
make its decision.
Signature of Proponent
Date Submitted
CHKLT.D=I-NOV-93 Page 22 of24
MASTERWEA
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheetfor project actions)
Because these questions are very general, it may be helpful to -read them in conjunction with the list of the elements of the
environment.
When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the
proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond
briefly and in general terms.
I. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of
toxic or hazardous substances; or production of noise?
if\J&P�A47r,D e:�;,'Fop-tA �JA-i-i�_-�
Proposal measures to avoid or reduce such increases are:
,:�,-rof:Z'LA WA,�,fV
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
):5P-'t 0'0 S '�-62 LAIVO S�CAP�,',M16- A1161— 1A171_e0QUC,!5- AJ!5'14J . P4_41VZ--
//Vcr- /-4_7- IS 0,C 1��A.So"U,4,9&E-
4CII-JICH
)Do- a V zo Z &RD W 65 S 7/,,,V 6- oR50'1
?7()IVI
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
^19 A/ /V %:, 00 V
3. How would the proposal be likely to deplete energy or natural resources?
"0
Proposed measures to protect or conserve energy and natural resources are:
,P CE S7 / & /"-/ 0 r= /0 /q"D TES I . W /&(- J- S 4 0/'-9
klWd' WN, OXZ"� L—iye-?Qd�
CHKLT.DW1-N0V-93 Page 23 of24
MASrER\SPEA
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or
under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered
species habitat, hist c or cultural sites, wetlands, floodplains, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land
or shoreline uses incompatible with existhig plans?
11611A
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transpor . tation or public services and utilities?
WO IV 6-�, d 5 V1 c 5
A u P e-Y �RAIQ IAI
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the
protection of the en ronment.
CHKLT.DOC\I-NOV-93 Pap 24 of 24
MASrER\SPEA
JUL-08-1998 09:24 ED MCHUGH ARCHITECT
206 957 4562 P.03
Oitical Areas Checklist
T�
m--s—fl—o—u --------------------------------------------
(SOilaltopogmphy/hydrology/vegetadon)
I. Sift Ad&tn[Locjnion: 9)(0 dMtLOV 2y ag"Of
2, Properry Tax Account Number: 00 00 0
I Aivmxirnste Site Size (ac rax or square feet): A C.
4. IS this sjtO CW=tly developed? —k6a, — no.
Ifyes, how is site dsvel-OpW
5. Desc;ribe the Stneml sht topography. cbcck R]l tbAt 4pply.
Flat- Im them 5-&rt alcyation cbmgc over entire 31tt.
Rolling: slopes on site ge=r&fty ICS5 than 15% (a vcrtical rise of 10jee over it
horizontal &Wce of 60-fea).
MAY-. SIQPW RMSCUI M Site Of More than 151/4 nd less than 31p/9 vellical rise of
I Meet over a hortzontal diftnce of 3 3 to 6&feet).
Steep, grades of greiter than 3 0% present on Ats (a vertical rise of 1 0-fvft over a
horlwaW diewce of lei's thaa 334400.
Omer (Please dw.,ribe):
6. Site contsim am" of year-mund otmding water. )V40 —; Amum. Dmh:
7. Site cooWhs areas of smonal =ftg waw.- Approx. Depth:
Wbat swu*#) of tho yoar?
8. Site is in the floodway ArO floodplain of a -water course.
0 - 930 emmim 4 wmk of an MT& Wbcm wamr fluw3 a=53 the grounds surface.? Flews M year-
round? IVW — flows am seasonal? A10 (What time of year?
10, She is prwuay-, fomftd Meadow shrubs Mixed
urban landscaimd (Im,"bs M) Z,
11. ObvionwWoridispreml on site:
/V
a
AtiviN
W
-0-0"m U. ]Go%"
TOTRL P.03
JUL-08"1995 09,23 ED MCHUOH ARCHITECT
206 957 4562 P.O?
ED. W-4jGw ogo4mcr
Pty d# UMOnds
COT-
ICIAL AREA!
1719�DfdcQ Arm Chm"St c6mm!"A 04 thi, lbrm is
to b4 fhk*d out 4 =y pmft Mrarl4g
lk'"10MAt PM=ft App1j,:a4Q4'gV ft City Of
Edmonfi prfor to hipjw 3uWu4 of a d"JopMad
pftmit to the city.
-n* PUTM of Lhe chedust islo anabla cif'y staff to
&tonmim "row "y pg*zWgl ClitfeW Ar= Ar#%, of
Mw be.. PLC=x on the Stbjoa wop&f�'. Tho
mftma6cm awed to C=Pwte *0 cimewim 'h"'ad
be way avaWIC fmm Vbxmtj0= of tL
d&4 m9able at City Hall (Cliticol Atm . ste cr
maps, or Sm Imnys). ifty*=dtSp
4:6Z teF
R
JUL 0 �
CHECKLIST
An W'mt Or ftiAer rapeaenrative, mut fw out
ft ctmz�' sign and &te N And ffuha�t it V *0
City. The cf1y wiu mv�llw tit chmkfis� mLah a
prm=m site %q;ft, MA 4mkc detemminarionOf
a .
6ut0quftt Xtel" ACC&SM7 to ramplem a dL-Ve1Qpmtnt
pemit gyp"cation. -
Plauf Eubm1i st jr"T 1"V A;0na v4th to S."fud
99py dc tulL eann V Lssim Civ $=' ib fin&ug W
focaft '4-' YP"'J'ac V=c C)f FOWZY described on
thi3 fh"a. In ad"oM the qplicUt shdl jWjud.
wher PeftcDt iu�Ors (0,9,, site plan, mpMphy
=P. etc.) or St4a in Coqiu=�'Dn V�jLh tm� chcust
IG M&W" =ff id empleing t6ir PZri'm
"Sw=t= of thg She
I have C*Woctw dzg &now Crftic4 -'-PM CbftkW dMd f'rAS% thM 011D m1w=
bw c(my imvdt* (Au mg the 4w0p3j&tc col.rm. 1.10w), ' pZoVided Iwo famid, to the
OwnwfAp*msw.
.1.4
�4 ;P914
SUM ftimv
zip
4-2* q
APPOcant RapreSentagm
JaL—
SkMAddms
city
zip
Telvhoxx
Siam
-7—
DW
Dee
(over)
loc. 18 9`1
July 9, 1998
Richard Hsue
23916 Highway 99
Edmonds, WA 98026
CITY OF EDMONDS BARBARA FAHEY
MAYOR
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works 9 Planning /Building 9 Parks and Recreation Engineering * Wastewater Treatment Plant
Subject: Determination regarding Critical Areas Checklist # 98-186
Dear Applicant:
Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City
is located on the reverse side of the form (bottom of page).
It is very important for yo u to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records.
-IMPORTANT INFORMATION TO BE NOTED:
PLEASE EXAMINE THIS" DETERMINATION" FOR ADDITIONAL REQUIREMENTS. YOU MAY NEED TO SUBMIT
ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHECKLIS OR CRITICAL AREAS STUDY.
The 'DETERMINATION' for the Critical Areas Checklist you submitted is a site -specific determination not a
project -specific determination.
moo. You must submit a copy of the CRITICAL AREAS CHECKLIST and DETERMINATION WITH ALL
PERMIT APPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED.
Permit applications include the following:
Building Permits
Conditional Use Permits
Subdivisions
Variances
Applications to the ADB* Land Use Applications
Any other development permit applications.
Enc: Critical Areas Determination
*Architectural Design Board
Thank you.
Sharla Graham
Acting Planning Secretary
C:Reception\Jana\CRLTR.doc
0 Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
...............
5
EX. POWER
POLE
SITE BM 'B'
AREA TO BE CLEARED
Ilk
R OVE
AT PAV
18"
cn
V)
co
CC)
Lli
C-D
Ld
X
Ld
TEMPORARY FROSION SEDIMENTATION CONTROL PLAN
NORTH SCALE: 1"=20.0'
CONSTRUCTION SEQUENCE
A. SCHEDULE AND ATTEND PRECONSTRUCTION MEETING WITH
CITY OF EDMONDS OFFICIALS.
B. ESTABLISH CLEARING AND GRADING LIMITS. FLAG AS SHOWN ON PLAN
C. CONSTRUCT PERIMETER FILTER FABRIC FENCE.
INSTALL CATCH BASIN PROTECTION
D. BEGIN AND COMPLETE DEMOLITION.
E. SITE CLEARING AND GRADING SHALL NOT BEGIN UNTIL
ALL EROSION CONTROL MEASURES ARE IN PLACE
F. CLEAR AND GRADE SITE. AMEND ESC FACILITIES AS REQUIRED.
G. INSTALL UNDERGROUND UTILITIES, INCLUDING SEWER, WATER AND
STORM DRAIN. INSTALL MANHOLES, CATCH BASINS, VALVES, ETC.
H. COMPLETE BUILDING AND PAVE SITE
1. AFTER COMPLETION OF PAVING, CONNECT ROOF DRAIN SYSTEM
TO THE STORM DRAIN SYSTEM.
J. HYDROSEED ALL LANDSCAPED AREAS UPON COMPLETION OF GRADING
ACTIVITIES AND IN ACCORDANCE WITH GRADING AND TEMPORARY EROSION
AND SEDIMENTATION CONTROL PLAN.
K. MAINTAIN ESC FACILITIES UNTIL ALL RISK OF EROS] ON/SEDI M ENTATION
DRAINAGE HAS PASSED AND PERMANENT STORM DRAINAGE SYSTEM IS
AND FUNCTIONAL.
L. REMOVE TESC FACILITIES UPON FINAL SITE STABILIZATION AND APPROVAL
FROM THE CITY OF EDMONDS OFFICIAL.
TEMPORARY SEDIMENTATION & EROSION CONTROL NOTES
ESC MINIMUM REQUIREMENT — STABILIZATION OF EXPOSED AREAS.
ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION
OF BMP'S, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING
OR MULCHING. ALL BMP'S SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL.
THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL
REMAIN EXPOSED FOR MORE THAN TWO (2) DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN
(7) DAYS FROM MAY 1 THROUGH SEPTEMBER 30).
2. ALL EROSION AND SEDIMENTATION CONTROL, MEASURES SHALL COMPLY WITH THE CITY OF EDMOND'S REQUIREMENTS ANT THE UNIFORM
BUILDING CODE SECTION 7013.
3. PLAN AND IMPLEMENT PROPER CLEARING AND GRADING OF THE SITE. CLEAR ONLY AREAS NEEDED FOR CONSTRUCTION ACTIVITY.
PHASE CLEARING SO THAT ONLY THOSE AREAS THAT ARE ACTIVELY BEING WORKED ARE UNCOVERED.
4. ALL MATERIAL EXCAVATED FROM THE SITE SHALL BE REMOVED IMMEDIATELY FROM THE PROJECT SITE, EXCEPT FOR SMALL QUANTITIES OF
MATERIAL REQUIRED FOR FILL. DO NOT STOCKPILE MATERIAL ON SITE,
5. ALL AREAS STRIPPED OF VEGETATIVE COVER, OR COVERED W/ SOIL SHALL BE SUBJECT TO EROSION & SEDIMENTATION CONTROL MEASURES.
PERMANENT MEASURES SHALL CONSIST OF SEEDING, FERTILIZING AND MULCHING, OR PLACEMENT OF LANDSCAPE MATERIALS AS SHOWN ON
THE DRAWINGS.
6. TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IMPLEMENTED IN THE EVENT THAT SEEDING WAS
NOT ACCOMPLISHED BY THE REQUIRED DATES, OR DURING PERIODS OF INCLEMENT WEATHER. TEMPORARY EROSION AND SEDIMENTATION
CONTROL MEASURES SHALL CONSIST OF PLACEMENT OF CLEAR PLASTIC SHEETING, SODDING, STRAW MULCHING OR EROSION CONTROL
BLANKETS AS NECESSARY TO STABILIZE THE SLOPES. AT ALL TIMES, THE CONTRACTOR SHALL HAVE AVAILABLE ON SITE, SUFFICIENT QUANTITIES
OF THESE MATERIALS TO BE APPLIED TO EXPOSED SLOPES IN THE EVENT OF INCLEMENT WEATHER.
7. TO REDUCE THE AMOUNT OF SOIL ADHERING TO TIRES OF CONSTRUCTION VEHICLES, APPLY GRAVEL OR CRUSHED ROCK TO THE
CONSTRUCTION DRIVEWAY AREA AND RESTRICT TRUCK TRAFFIC TO THIS ONE ROUTE. DRIVEWAY PAVING CAN BE INSTALLED DIRECTLY OVER
THE GRAVEL. THE ACCESS SHOULD BE PERIODICALLY INSPECTED AND MAINTAINED BY WASHING, TOP DRESSING WITH ADDITIONAL
STONE AS NECESSARY, REWORKING AND COMPACTION.
8. PROVIDE FOR PERIODIC STREET CLEANING TO REMOVE ANY SEDIMENT THAT MAY HAVE BEEN TRACKED OUT. SEDIMENT SHOULD
BE REMOVED BY SHOVELING OR SWEEPING AND CAREFULLY REMOVED TO A SUITABLE DISPOSAL AREA WHERE IT WILL NOT ERODE AGAIN.
9. THE CONTRACTOR SHALL CLEAN ALL STORM DRAINAGE PIPING TO BE FREE FROM SILT SUBSEQUENT TO SITE STABILIZATION.
CONTRACTOR SHALL REMOVE ALL EROSION AND SEDIMENTATION CONTROL MEASURES SUBSEQUENT TO SITE STABILIZATION.
10. EROSION CONTROL MEASURES SHOWN ARE A MINIMUM: ADDITIONAL MEASURES MAY BE REQJIRED AS CONDITIONS WARRANT,
0
VEX. LIGHT POLE
I
n
SS CO
/EXISTING PHONE EX. CATCH BASIN/
TREES BOOTH RIM — 443.12
(SOLID LID)
051
EX. CATCH BASIN
RIM — 441.15'
IE 12" ESE — 439.20
EX. CATCH BASIN
RIM — 442.19'
(SOLID LID)
CB
GEOTEXTILE FILTER FABRIC
MIRAFI 10OX OR EQUAL
p
2"x 2" WOOD POST
ol OR METAL POST
8'-0" ON CENTER
WASHED GRAVEL
rl_'� FILTER FABRIC FENCE
NO SCALE
STANDARD SILT FENCE NOTES
A. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO
THE LENGTH OF THE BARRIER TO AVOID USE OF JOINTS. WHEN JOINTS ARE
NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT
POST, WITH A MINIMUM 6- OVERLAP, AND BOTH ENDS SECURELY FASTENED TO
THE POST.
B. POSTS SHALL BE SPACED A MAXIMUM OF 6' APART AND DRIVEN SECURELY
INTO THE GROUND A MINIMUM OF 30 INCHES (WHERE PHYSICALLY POSSIBLE).
C. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 8" WIDE AND 12" DEEP
ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. THE
TRENCH SHALL BE CONSTRUCTED TO FOLLOW THE CONTOUR.
D. WHEN SLIT FILM FILTER FABRIC IS USED, WIRE MESH SUPPORT
FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE
POSTS USING HEAVY—DUTY WIRE STAPLES AT LEAST 1- LONG, TIE WIRES OR
HOG RINGS. THE WIRE SHALL EXTEND INTO THE TRENCH A MINIMUM OF 4"
AND SHALL NOT EXTEND MORE THAN 36" ABOVE THE ORIGINAL GROUND SURFACE.
E. SLIT FILM FILTER FABRIC SHALL BE WIRED TO THE FENCE, AND 20" OF THE
FABRIC SHALL EXTEND INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND
MORE THAN 36" ABOVE THE ORIGINAL GROUND SURFACE. FILTER
FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. OTHER TYPES OF
FABRIC MAY BE STAPLED TO THE FENCE.
F. WHEN EXTRA —STRENGTH OR MONOFILAMENT FABRIC AND CLOSER POST
SPACING ARE USED, THE WIRE MESH SUPPORT FENCE MAY BE ELIMINATED.
IN SUCH A CASE, THE FILTER FABRIC IS STAPLED OR WIRED DIRECTLY TO THE
POSTS WITH ALL OTHER PROVISIONS OF STANDARD NOTE "E" APPLYING.
EXTRA CARE SHOULD BE USED WHEN JOINING OR OVERLAPPING
THESE STIFFER FABRICS.
MAINTENANCE
INSPECT IMMEDIATELY AFTER EACH RAINFALL, AND AT LEAST DAILY DURING
PROLONGED RAINFALL. REPAIR AS NECESSARY.
SEDIMENT MUST BE REMOVED WHEN IT REACHES APPROXIMATELY ONE—THIRD
THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED.
ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE FILTER FENCE IS
NO LONGER REQUIRED SHALL BE SPREAD TO CONFORM WITH THE EXISTING
GRADE, PREPARED AND SEEDED.
ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED
30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE
TEMPORARY BMP'S ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE
REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM
REMOVAL SHALL BE PERMANENTLY STABILIZED.
91
JQCITY OF EDMONDS, DEVELOPMENT SERVICES
CC? i o fe'7
DATE
Ito
I I m
ru-p g as 't (o - 0 o
:A_
in
ry
z to
Z
UJ
Lo
0 Lo
z ,
F- in
0
cn
z
0
u
SHEET NO.
c
SHEET
OF
EX. POWER
POLE
SITE BM 'B'
44E
44J
44E
44.1;
444
443
442
441
440
4.39
438
437
436
435
0
Lli
:1z'
00
t
NORTH
TAPER A.C. @
10:1 TO MATCH
EX. PVMT.
1:12 SIDEWALK----\
RAMP
5? F4 -44-.2 OT _T_C L
5�,\1443.70 TPI/--
\ \ \ I /
TYP. CONC. Sd ALK�
SECTION. SEE
DETAIL I/C-4
VERTICAL C R
U,
CUTTER. SEE
DETAIL 2/C-4 c�
TYP. PAVEMEN
SECT ON. SEE
DETAL 3/C-4 12.0'
TC
4 TP
HIGH FRAFFIC LOAD---�
' E VAY ACCEPS
DR'V
SEE 'TAIL 4/1-4
1
B ----
z
LLJ
m 11)
441,20 1
4270
z
LLJ
>
LLJ
CD
LLJ
SAWC0
LINE 7___f_�
1441.81
1441.31
1:12 SIDEWALK -
RAMP
TAPER A.C. @
10:1 TO MATCH
EX. PVMT.
F" Pr, r N-1
[W.-IT119
SITE PLAN
SCALE: 1 "=20.0'
1445.00 FG
EXISTING
RETAINING WALL
rT� DIG - 1445.0) FG TO REMAIN
- - -- - -- - --
4\6
EXIST. BUILDING
EXISTING
PARKING
REMOVE �2dSEXISTING S
GUESTRO
EXIST. BUILDING
-444- r3 6 3 9 W T4 6-2 ir 4 4-3 -7
1/ 7 7 1 7 7 7 7 7 7 -77 7
L
NEW MOTEL ANNEX I
_ SULDING 4 - TWO STORY
19 6LIE&T ROOMS PLUS NEW
MANAGER 'AP-�. -AND NEW LAUNDRY
(6,800 SF TOTAL TRff-A)-
443.40 TP
443.48 TP
F.F. 443.50
0
0 �,,.-EX. SS CO
6 Lo TP
J III EX POWER/.-
U)
S��VICE
1:12 1:12
443.2 TP I LLJ 0
Lo
0 4 3.15 TIC 3.15 TC !1442.65 TIC F443.15 TC :2
4 2.65 TP 4' .65 TIP p 442.65 TP (OD
�\R= 18e! Qf STEPS
�444 "s
4,43.15 T
44Z.65�7
LLJ
EXISTING MOTEL
EX. WM 1B
BUILDING I - ONE STORY
EX. POWER SERVICE
FF 443.62' 5 GUEST ROOMS PLUS
MANAGER/REGISTRATION
EX. ASPHALT PAVEMENT
1+4FJ UU I cn
442'
.50 TP 57< -
TP :D
442.20 RIM 442.68 TP / Ld 00
- - - - - - -- - - - - - - - - - - - - --------- ---- : - - : - - - - - - - - - - - - --------
442.70 TP
443.00 TC �44220 RIM
i 442.70 i M
442.50 TP 443.13 TlC
Tr 442.63 T., P
443.5p
R= 18' 443. 44,3,E -
TIC F443.5-0TC]
43.001 Tp
1443.00 fP
WM
EB
011L EXISTING
12"CEDAR
TO REMAIN
EX. LIGHT POLE
GRADI'Nk'G PLAN
SCALE: 1 "=20.0'
EXIST. BUILDING
EX. Y�RD DRAIN-,
IRIM 442 ' 56' EXISTING MOTEL/
I.E. KNOWN M BUILDING 2 - ONE STORY
4 6 GUEST ROOMS
EB
EX. POWER SERVIC FF = 443.29'
.....................
6
S 88'36'39" E 275.22'
443.90 Tcl LIGHT POLE
443.40 TIP
=3
z-
-- -----
____�X__l_S
-TI-N-G-
_LDl_Nq____
B U I
-
---------------
- -----------
--
S'
SQ. 42
S=
AS0HALT
24"
COATED
S"E�
Cl
P
ASOHALT
CDATED
!---SD-DE
Cmp
TE*T10
-------
Y. WATER
-lYIPE
2 CATU
BASIN
'BEHIND
"\-TYPE
2 (ATCH
EYSIN
\--TYPE
2
CATCH BASIN
EX. SEWER-/ V-_-00NNECT
. i
I.E.
_ I I
= 4
AT EXIST.
L Bu
8.25
-
-OIL/WNTER
SE
TRATOR
I
T
0 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00
DRIVEWAY / PARKING LOT PROFILE
SCALE: 1 " = 20.0' HORIZONTAL
SCALE: 1" = 4.0' VERTICAL
449
448
447
446
445
444
443
442
441
440
439
438
437
436
435
44
SS co
6" 017D
40-
_J/EXISTING
BILLBOARD TREES PHONE EX. CATCH BASIN/
SUPPORTS BOOTH RIM - 443.12
(SOLID LID)
0)
COGE
Aq�
-z'
442
EX. CATCH BASIN
RIM - 441.15'
IE 12" ESE - 439.20
EX. CATCH BASIN
_442- RIM - 442.19'
(SOLID LID)
CB
EX. LIGHT POLE
LA N D SC
A P E A RI
A
//-CONCRETE
STEM
WA-L
-LANDSCAPE
AR
A
LANDSCAPE
ARE
/-EXIIII
ING GRADE
NEW BUILDING
Z__
CONC.
CU
RB
F.F.
1443.5
-S
ZI
Sil
)EWALK
1.5%
z
CL
-TYPE-' ,
___C-ATCH
BASIN—
SITE CROSS SECTION
SCALE: 1" = 20.0' HORIZONTAL
SCALE: I" = 4.0' VERTICAL
FA
10
APPROVED1
OF EDMONDS, DEVELOPMENT SERVICES
00
Lu
cc
co
zI.-
04
W219
w
to
co Z to
0
co
LL Z
0
L6
U4
=3
a
1 12"' x 6" TAPPING TEE (FL) - ___1
1 �" GATE VALVE (FLXMJ), 6LF OF 6" D:1.
I CAST IRON VALVE BOX
I FIRE HYDRANT ASSEMBLY PER
OLYMPIC VIEW WATER DISTRICT STANDARDS
CONCRETE BLOCKING
1 12" x 3' TAPPING TEE (FL)
1 3" GATE VALVE (FLxMJ)
I CAST IRON VALVE BOX
CONCRETE BLOCKING
1 1/2- CORPORATION STOP
v$1 r
cn
co
00
EX. POWER
POLE
SITE BM 'B'
SEWER SADDLE
CONNECTION
FIELD VERIFY I.E.
iPovAr I I M-9
IN
IYPE 1
COVER
RIM
LF 7
CONNECT
TYPE I C
I.E. = 43
8
ci
001
bi
i
I/ soun
L ICOLLECTI
I
'co
—4— WI
E
SIT.
3n PoSt INDICATOR VALVE (MJxFL)
3" DOUILE DETECTOR CHECK VALVE ASSEMBLY
W/ METERED BYPASS, IN CONC. VAULT.
SIZE TO BE VERIFIED BY MECHANICAL DESIGNER
1 11/2"�DOMESTIC METER. SIZE TO BE
VERIFIED BY MECHANICAL DESIGNER
IRRICA11ON CONNECTION
SEE IRRIGATION PLAN FOR CONTIN NG
RIM �45.00 RETAINING WALL
I.E. 443-00 TO REMAIN
_-7Ex1s11
A" qn
YARD DRAIN
SEE DET. 2/C3.0, TYP.
RIM = 443.00
I.E. = 441.00
V, EXIST. BUILDING
rr- 77777-
r-4 PP---r-
nczC
Ds-
f
NEW MOTEL ANNEX
"-BLULDING 4 - TWO STORY lcn
CL /116
19 GUEST ROOMS PLUS NEW In
\CLEANOUT MANAGER V-T- AND NEW LAUNDRY
RIM 443
RIM 445-00 (6.800. SF JOTAL iR_EjA 1/ I.E. 440.
I.E. 440.65
DEr7 3/C3.0, TYP.
14
---"4 PP- ---------------------------
--- ---- Op
ONC. DRAIN
DS S E DET. YD EX. SS CC
I C3.0 '443.4 1 D EX POWI
RM =
S6VICE
441.Oq
I.E.
RIM = 443.
001
V), L'i R
I.E. = 440.65 V)
(0/ 00
CONNECT 4- P
:�i �! gg
RIM 442.65_1 INTO Ca a 18-,
I.E. 441 15 I.E. 441.0
�:—�!444— j-bs— — —
—6" SEWER CLEANOLW — Ds, / , I= u C'n
AT RIGHT OF WAY C IL--4" LLJ
6" SEWER % I / Lf) 5 ,
ASPHALT; COATED CMp S=1.0% (MIN.) ASPHALT COATED CMP co
�t ILL
PON 24m SD DETENTION, L=45.5- 24N SD DErENTJON:__�-' �65 X
13 u L �Lj
T E 2 C8, 48"0 TYPE 2 CB74V8"O
R RIM 442.20 RIM = 442.50
Y
,EX SS CC
'o
p 7
1. EM. = 438.50 I.E. 438.50
W
$5k% CONT. STRUCTURE PE. 2 CB, 48-0
1
S E DETAIL 4/C3.0 RIM = 442.20
I.E. = 438.50
LEANOUT
RIM N- 442.40
I.E. = 43940�_ F\ —
EXI�TING
12 CEDAR
TO REMAJN
EX. LIGHT POLE
EXIST. BUILDING
REFER TO SHEET Al FOR PARKING DIMENSIONS AND AISLE WIDTH
UTILITY PLAN
SCALE: 1 "=20.0'
9" 0 CAST IRON DECK DRAIN
W/ SUPPORT FLANGE, 6" 0 OUTLET _6" GREEN FLAT GRATE
POLISHED BRONZE GRATE, ZURN MODEL NDS MODEL 80 AT LAWN AREAS
Z-533-ZB, OR EQUAL.
CONCRETE SIDEWALK /11r
6" DIAMETER
SEE PLAN FOR INVERT
ELEVATION
ILI NDS "SPEED-D-BASIN"
MODEL 300
rl"� CONCRETE DRAIN
ELOIJ NO SCALE
FINISH GRADE, LAWN
6" DIAMETER
SEE PLAN FOR INVERT
ELEVATION
NDS "SPEED- D- BASIN"
MODEL 300
YARD DRAIN
NO SCALE
N EEF3739" W 346.22' 0
--d pm
77717
EX. WM gi EXISTING MOTEL
EX. POWER SERVICE BUILDING 1 - ONE STORY
FFF 443.62, 5 GUEST ROOMS PLUS
CONNECT EX. BUILDING MANAGER/REGISTRATION
SEWER TO NEW 6" SEWER
REMOVE EX. SEWER TO WEST.���//
FIELD VERIFY I.E. I
STEPS
SEWER CLEANOUT
FIELD VERIFY I.E.
EX. YARD DRAIN WM
RIM - 442.56
I.E. UNKNOWN
91
EX. POWER SERVICE--�
/-CAST IRON LOCKING
COVER AND FRAME
18" SQ. x 6" THICK
CONCRETE COLLAR
FINISHED
GRADE
10 .7 =111==
t! -A,
4" DIAMETER
u1mmr 1
PLUG SEE PLAN FOR INVERT
ELEVATION, AND SIZE
�5 CLEANOUT
NO SCALE
EX. ASPHALT PAVEMENT
EXISTING MOTEL'
BUILDING 2 - ONE STORY
6 GUEST ROOMS
FF = 443.29'
M��S 88*36'39" E 275.22'
LIGHT POLE
RIM = 442.20
DETENTION TANK DETAIL
NO SCALE
SS Co
XT,
0
_JEXISTING PHONE
BILLBOARD & TREES BOOTH �_EX. CATCH BASIN/
SUPPORTS RIM - 443.12
(SOLID LID)
GE C5
J*
_A1
CIA
_z_
EX. CATCH BASIN
RIM 441.15'
J#
0
VEX. LIGHT POLE
i STORM DRAIN
MANHOLE
IE 12 ESE - 439.20
CATCH BASIN
RIM - 442.19'
(SOLID LID)
CB
NOTE:
VOLUME OF DETENTION SYSTEM
EQUALS 364 CUBIC FEET. VOLUME
REQUIRED EQUALS 332 CUBIC FEET.
;ER, DRILLED
DIAMETER = 1 7/16"
FA
OF EDMONDS, DEVELOPMENT SERVICES
OLYMPIC VIEW WATER AND SEWER DISRCT
DATE
I- Z�3 _1�
cf)
ry
bi fl,
Df W 04
z Lo
Lu 5 Lo
Z
La
V)
Lo
0 _J 04
z
cq
04
0
CC)
w
L�q W-4
z
0
C4
Ash,
0
IV 6a
�k
c\2
rip
SHEET NO.
C-3:
9
1201
SHEET OF
RMS
61 --A
51-71
ASPHALT
2"ACP
4" ROCX
0.02 FTJ FT.* CONCRETE
. Z% �- '? * ::4k
510 TYPICAL
6" DRIVEWAY
CITY OF EDMO'k'D . ENGINEERIN
Im s D I v I u 0 N
,REVISIONS STANDARD DETAILS
TYPICAL SIDEWALK
..... .......... ........
N01
tSGALE: NTS
BACK OF SIDEWALK
)ATE:
TYPICAL SIDE--W_ALK
NO SCALE
I ACP DRIVEWAY
IRAMP (TyP)j
VARIARLE PER CODE
TYPE "A" CURB & GUTTER -"q
CONCRETE GUTTER CARRIED THROUGH INTERSECTION
ISOMETRIC VIEW SIDEWALK RAMP
(7'WIDE SIDEWALK)
'�k
18" TRANSITION (TYP)
71
11
1211
F
24'
GUTTER SECTION
CITY OF EDMONDS' ENGINEERING
I V I S 10 �N
AND RD DETA
IRT
ILS
REVISIONS
H
91].,HIGH TRAFFIC LOAD DRIVEWAY ACCESS.
scAl-FE- NTS DNG- Na.
HIGH TRAFFIC LOAD DRIVEWAY ACCESS
NO SCALE
5 1/2"
I" BATTER
1" R.
lot R.
0�.05 FT. �// FT�-
1211 PAVEMENT WIDTH
W "
18" STANDARD
24" ARTERIAL
6'f
SHOULDER PAVEMENT
MINIMUM THICKNESS
4" LEVEL COURSE 2" ACP PAVEMENT
7A,
2" AGG LEVELING COURSE
Ck
N\
41 4" AGG BASE COURSE
APPROVED SUBBASE
ENGINEERING
CITY OF
IL A ENGINEERING
ED O&'DS
Ivi IN *DIVIS-ION
IS
CITY OF
EDMOK1'q'DS - 'DIVISION-
ONAL'S
----------
REVISIONS
-STANDARD DETAILS
REVISIONS
I
STANDARD DETAILS
TYPICAL PAVEMENT SECTION
VERTICAL CURB AND GUTTER
SCALE NTS
ONG. NOr
DATe
%ALE: NTS DNG� NOr
VERTICAL
CURB AND GUTTER
Y PICAL
PAVEMENT SECTION
w r-
NO SCALE
NO SCALE
Z LO
LLJ 0 LO
z
W LO
V) z
1
Ln
-i C14
LL- V)
z
0
U
"�z
)10
'1, 100,
ilyl,AV 0�1
lie AV
Ov"
4�� /y
411-8" QUARRY SPALS
PROVIDE FULL WIDTH OF INGRESSI EGRESS AREA
FILTER FABRIC MATERIAL
211 BY 2" BY 14 GA. WIRE FABRIC OR EQUIV
,�a
PROVIDE 3/4" TO 1.5" WASHED GRAVEL BACKFILL-----"-[,,
IN TRENCH AND ON BOTH SIDES OF FILTER FENCE
FABRIC ON THE SURFACE
211 BY 411 WOOD POST ALT: STEEL FENCE POSTS
CITY
,REVISIONS
611
21011
5101f
tl 2 it
E N G I N E E R I N 0
OF EDMONDS 'DIVISION
STANDARD DETAILS
FILTER FABRIC FENCE AND
STABILIZED CONSTUCTION ENTRANCE
SCALE: NTS 1.�NG. Nor
El��� 11
OF EDMONDS, DEVELOPMENT SERVICES
cq
0
14
TO
0
X
0
Z
f4
Zm
0
0)
c'",
CQ
44
�?10
00
-b
C3
LL:
<
01
V)
SHEET NO.
C-4
SHEET Of