Loading...
24026 107TH PL W.PDFiiiiiiiiii 477 , 24026 107TH PL W 8 9 0 . 199 - City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT �ermit Number. Issue Date: ��69_ �:35_9 0400J��7 7V F? A. Address or Vicinity of Construction: 107 B. Type of Work (be specific): JZeL_CJfA7Z,', WAJE�6Z ME77� C. Contracton'OLYMPICC"', vew Contact: Mailing Address: �a_-3_10S i�4:7)Mb&&25 Phone: -77 State License #: Liability Insurance: _ Bond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. [:]Commercial []Subdivision E) City Project Utility (PUD, GTE, WNG, CABI_4:-.�/W�VrATER) n Multi -Family [] SingleFamily E] Other INSPECTOR: INSPECTOR: x F. Pavement or Concrete Cut 0 Yes )XNo G. Size of Cut: H. Chargq-$ APPLICANT TO READ AND SIGN INDEMNITY. Applicant understands and by his signature to this application, agrees to hold t]" City ofEdmonds harmles from in uries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmond8, or any of its departments or employees, including or not limited to the defense ofany legalproceedings including defense Costs, and attorney fees by reason ofgranting thispermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working dhLy; NO EXCEPTIONS. Ihavereadthea o e statements and wzderstand the permit requirements and the pink copy of thepermit will be 11 tim 1p available on site Ot "alltim for &S , C rposes. Signature: Date: 0-7 (CoRtractor r _ W'ent) �V E-AJ454q*FT14 14 IC T '.LL IAL- - I IOR TO BEGINNING WO�K FOR CITY USE, ONLY APPROVED BY. Flyd RIG'HT OF WAY DEPOSIT TIME A UTHORIZED: VOID AFTER —DAYS SPECIAL CONDITIONS: VA COMMENTS: DISRUPTION FEE/FUND Ill: RESTORATION FEE: PERMrrFEE:,, 10. TOTAL FEE: RECEIPT FEE: to DATE: ISSUED NO WORK SHALL BEGIN PRIOR'TU, PERMIT ISSUANCE Eng. Div. 1994 FIELD INSPECTION NOTES Comments: Diagram.: CONTRACTOR CALLED FOR INSPECTION Partial Work Inspection by P.W.: Work Disapproved By: FINAL APPROVAL BY: (Fund 111 - Route copy to Street Dept.) El YES Date: Date: El NO