242 4TH AVE S.PDF111111111111 5064 242 4TH AVE S ENGINEERING REQUIREME14TS FOR COHMERCIAL b"�EET A14D APARTME14T BUILDING PROJECTS Name McConnachie - 4-Unit &pt. 517 4th Avenue S. Date February 25, 1976 STREETS AND ACCESS 1. Right -of -Way Requirements: 60-foot existing 2. Road Bed'Width: 36 ft asphalt concrete existing - L.I.D. 100 3. Turn Around: Required on property 4. Sidewalks: -5-foot sidewalk required 5. Parking Strip: None Off Street parking 6. Access Easements: None UTILITIES 1. Water Mains: ' 4-inch C.I. existing 2. Fire Hydrants: Existing 3. - Sewers or Septic Tanks: Connection to Banitary sewer required FILE 4. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan and City Standards. Where drainage is across adjacent private property, all parties having any ownership interest in the'lands being developed shall provide, as a restriction on the title running with the land, that the City of Edmonds shall be held harmless from any and all claims for damages which may be occasioned to adjacent land by reason of the construction and operation of the drainage system, unless, releases of ddmages and/or drainage easements are obtained from the other property owners affected by said drainage. Any drainage problems created by change of contour during development must be corrected prior to occupancy permits or release of performance bond. Final approval (or release of bond) will be withheld until actual drainage as installed has been inspected by the City Engineer. Engineering ifluirements for Comm'l & Apartment BuWing Projects - LMe I 5. Utility Easements: 6. Underground Utilities: To be provided Street lighting shall also be provided standards and underground wiring. in accordance with Ordinance No. 1387. with the necessary street light TOPOGRAPHY 1. Excavation and Grading: Excavation and grading shall conform to the requirements outlined in Chapter 70 of the Uniform Building Code, latest adopted edition, Vol. 1. Where extensive grading and fill are involved in the development, a grading plan and specifications shall be prepared. QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS 11.02.025(f) Utilities and Street !Mrovements. No building permit shall be issued for the construction of any building or structure of any kind or description unless the plans and specifications include the construction for clarbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and storm drainage necessitated by the new construction or improvement, to be built to applicable City standards, provided, however, if found by the City Engineer to be impractical to construct at the time of application for said building permit, construction may be waived by the City Engineer and in lieu thereof a performance bond filed with said engineer to cover the estimated cost of construction to City standards for said improvements, provided further, in areas zoned single family residential at the time of said application for building permit in which the applicant has received final approval for a plat or sub -division and has compiled with requirements therein compliance with this subsection shall be deemed by compliance with the sub -division or plat requirements. COMMENTS Connection to existing storm sewer s_vstem required. For location, refer to site plan for "Baskin -Robbins" developrwnt filed with the Building Dept. Ci Fy—Engineer Rev. April 2, 11371 F'orm 5 AMENITIES DESIGN BOA1:',D - MAY -42, 1974 - PAGE 3 installed on the site. A MOTION WAS MADE BY MR. LATOUTRELL To ArPROVE ADB-35-74. 140TION SECONDED BY MR. GOLDSMITH AND CARRIED. /ADB-38-74 Obrien's Turkev House - 240th & 99 Hwy.. Sign attached to building. Mr. Wallis stated that there was not a representative present deferred to represent Obrien's Turkey House. The item was until the next meeting. ADB-32-74 io - 19 unit townhouse apartment development at zjil-2 - 76th West -(11!ML) Mr. Wallis showed slides of the site stating that the request is for development and construction of 19 townhouse units Mr. Wallis and using the existing house for the manager. pointed out that the site is nicely wooded and would strongly encourage the,Board to consider retention of the natural ,here Wallis stated there were parking areas i vegetation . 14r . the natural vegetation could be used ve!ry effectively for screening. 11r. DiPangrazio presented plans to the Board for up There was general discussion regarding landscapino, their review. parking and lighting for the parking area with Mr. DiPangrazio J answering questions After further reviewing discussion, Mr. Latourell stated that he v-puld be in favor of approving Mr. D-;Panzrazio's application subject to a more detailed d for the north, east and south si e indicating landscape design 0 CJ some rather s . ubstantial high growing plants; and that lights in the parking area be shielded from off -site viewing. in form of a Mr. Latourell stated that he would put that the THE MOTION WAS SECONDED BY MR. GOLDS111IT11 AND CARRIED. MOTION. ADB-33-74 Donald L. Himilton - Addition to existing structure at M-1-4-aliTs tree t (BC) Mr. Wallis showed slides of the existing structure, stating that the main floor is used as a retail fishing tackle and accessory shop, and the second floor is a two -bedroom apartment. Mr. Hamilton, the applicant, presented plans to the Board stating that the addition to the existing structure would be used as a small commercial shop. There was general discussion regarding the proposed landscaping plans with Mr. Hamilton stating that hi also has plans for a sign and would submit an application to this Board at that time. A 140TION WAS MADE BY MR. LATOURELL TO ACCEPT ADB-33-74. MOTION SECONDED BY MR. GOLDSMITH AND CARRIED. 74 K-Mart Laundry - Construction of Coin -op laundry at 76th and ig way 9T---Don Bodine. H F— Mr. Wallis stated that Mr. Bodine was not present and the item was deferred until the next meeting. APD,37-74 C. A. McConnachie - Apartme.nt-Condominium - 252- 4th Ave. S(Pd-'I) Mr. Wallis showed slides of the site, stating that the property is presently zoned R14 and that the application is for an apartment -condominium. The Board reviewed Mr. Connachie's AMENITIE'S DESIGN BOARD MAY 22, 1974 - PAGE 4 i I ding and landscaping plans commending him on its design c' T and compatibility with the site. Mr. Goldsmith stated that t._�Xthe landscape plans were also very complete and he would therefore make a !.'OTION TO APPROVE ADB-37-74. MOTION SECO14DED BY 1U), LATOURELLAND CARRIED. B-39-74 Stevens Dental Center - Signing, landscaping and parking lot lighting - 7 th Avenue West. Mr. Wallis showed slides of the Stevens Dental Center pointing out that there is substantial mechanical equipment located to the front of the building that would need to be screened. Dr. Sogn presented signing and landscaping plans to the Board for their review. There was considerable discussion regarding the landscape plan with the question raised as -to how the mechanical equipment would be screened. Dr. Sogn stated they were proposing a solid evergreen screen in front of the mechanical equipment that would be trimmed or pruned to approximately 31�,- or 4 feet. Mr. Wallis asked if there was enough room in front of the mechanical equipment to create an earth burm. Dr. Sogn stated that there was some earth there now, but a burm would not be necessary with the proposed screening. The Board reviewed the proposed signing and parking lot lighting and found them to be acceptable. A MOTION WAS ITADE BY IMR. GOLDSMITH AND SECONDED BY MR. LATOURELL TO ACCEPT ADB-39-74. MOTION CARRIED. L.'_�B-40-74 William D. Barr - Addition to existing day care building Maple Bar Ranch (RML) Mr. Barr had previously made a request for construction of an octagonal building. Mr. Wallis stated that 1"Ir. Barr's request at this time is for an addition to the existing building. Mr. Wallis showed slides pointing out the location of the existing building and stating that the existing plants and shrubs would not be disturbed. Mr. Barr stated they would prefer to build the octagonal building, but they had run out of time in order to provide a new structure before school begins in September. There was general discussion regarding parking with 1-1r. Barr stating that the plans will provide for a drive through whereby the parents could drive in, drop the children off and drive on through. After general discussion of the landscaping plan, MR. GOLDSMITH MADE A MOTIOIN TO ACCEPT THE PLAN FOR ADB-40-74 AS SUBMITTED. SECONDED BY _MR. LATOURELL AND CARRIED. Chairman Bernhoft then referred back to ADB-27-74, Project Management Associates - Park View Firs tor tinal landscape review, Jerry Schlatter, representarive for Park View Firs, presented their landscape plan. Ile was commended for sensitive handling C� of the landscape plan, particularly the detailed plans presented. A MOTION WAS M�hl)E TO APPROVE THE PLANS FOR ADB-27-74 AS PRESENTED. MOTION SECONDED AND CARRIED. 0 ST�---i-'EET FILE ENGINEERING REQUIREMENTS FOR COMMERCIAL AND APARTME14T BUILDING PROJECTS Name MC CONNACHIE 6-UNIT APARTMENT - 242 4th Avenue South Date May 9, 1974 STREETS AND ACCESS 1. Right -of -Way Requirements: 60' existing 2. Road Bed Width: Alley used for access to be gravelled 3. Turn Around: None 4. Sidewalks: Existing 5. Parking Strip: None 6. Access Easements: None UTILITIES 1. Water Mains: 4-inch existing 2. Fire Hydrants: None required 3. Sewers or Septic Tanks: Connection to sanitary sewer required 4. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan and City Standards. Where drainage is across adjacent private property, all parties having any ownership interest in the lands being developed shall provide, as a restriction on the title running with the land, that the City of Edmonds shall be held harmless from any and all claims for damages which may be occasioned to adjacent land by reason of the construction and operation of the drainage system, unless, releases of damages and/or drainage easements are obtained from the other property owners affected by said drainage. Any drainage problems created by change of contour during development must be corrected, prior to occupancy permits or release of performance bond. Final approval (or release of bond) will be withheld until actual drainage as installed has been inspected by the City Engineer. Engineering, Requi4 ents for Commll & Apartment Buildingkojects - Page 2 5. Utility Easements: 6. Underground Utilities: To be provided in accordance with Ordinance No. 1387. Street lighting shall also be provided with the necessary street light standards and underground wiring. TOPOGRAPHY 1. Excavation and Grading: Excavation and grading shall conform to the requirements outlined in Chapter 70 of the Uniform Building Code, latest adopted edition, Vol. 1. Where extensive grading and fill are involved in the development, a grading plan and specifications shall be prepared. QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS 11.02.025(f) Utilities and Street Improvements. No building permit shall be issued for the const7uction of any building or structure of any kind or description unless the plans and specifications include the construction for cbrbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and storm drainage necessitated by the new construction or improvement, to be built to applicable City standards, provided, however, if found by the City Engineer to be impractical to construct at the time of application for said building permit, construction may be waived by the City Engineer and in lieu thereof a performance bond filed with said engineer to cover the estimated cost of construction to City standards for said improvements, provided further, in areas zoned single family residential at the time of said application for building permit in which the applicant has received final approval for a plat or sub -division and has compiled with requirements therein compliance with this subsection shall be deemed by compliance with the sub -division or plat requirements. COMMENTS Rev. April 2, 1971 L CVtv Engineer ST�`--'i'EET FILE CITY OF FE93MONDS 200 DAYTON ST. - EDMONDS. WASHINGTON 98020 - (206) 771-3202 DEPARTMENT OF PUBLIC WORKS March 17, 1983 Mr. E. Stime 242"4th:Ave. S. Edmonds, WA 98020 Dear Mr. Stime: SUBJECT: CROSS CONNECTION/IRRIGATION SYSTEMS HARVE H. HARRISON MAYOR An irrigaiton system located on your property may be in violation of State of Washington and City of Edmonds ordinances related to backflow prevention. To protect the potable, or drinking water supply, an approved backflow' device is mandatory on all irrigation systems. Please call the Water Department Cross Connection Inspector, Lee Willeiksen, at 771-3202, extension 294, for information or an appointment for inspection of your irrigation system. Requirements to meet State and City Codes need to be completed within thirty (30) days from receipt of this notification. Sincerely, ZZAnRCHIE26BR�ENA Water/Sewer Division Supervisor ml 4j 174-3 MILLS DT M RCH DT 7 11q'1C'1?30 �V' APPLICATION for The City of Edmonds SIDE SEWER PERNaT . EASEMENT No . ................................. NEW, CONSTRUCTION 0 REPAIRS lol-Q9209 OWNER................ PA"01AAA ...... A11.44 .................................................... CONTRACTOR ........................................................................... ...................... PERMIT No . ...................... 242 4th Ave* Se ADDRESS, ............ ---- — ----------------------------------------------------- ........... LEGAL DESCRIPTION: LOT No ................................................ BLOCK No . .................. ......................... NAMEOF ADDITION ............................................................................. ............................................................ LU LL LLJ uj Dye Tested On Sewer Ju4e, 1972 Approved - DATE........................ . ...................... By ................................. ............... ................ STREET fILE W CITY OF EDMONDS ENGINEERING DEPARTMENT 505 BELL STREET EDMONDS, WASHINGTON 98020 APPLICATION FOR INVASION OF RIGHT-OF-WAY (Submit In Duplicate) Permit to be issued to: — For work at: (4,4dress.or vicini Type of work.to be done:. (Attach Drawing When Applicable) RKsc—v4 4 A k- c [-I 'y -.CA C, Owner:— Ni " iN, C-�4 Name Mailing Address Contractor: Name Mailing Address Telephone Number Telephone Number 1, Signature: 71- Owner or Agent Date Signed DO NOT WRITE BELOW THIS LINE (To becompleted by Issuing Agency) Permit Issued (date) I/ �� z Remarks: '— ?-I , - �/- 74" Permit Number — A ZL/ I Upon issuance of this permit, the contractor is responsible Work subject to inspection and restoration in accordence for workmanship and materials for a period of one year with city code. A 24 hour notice is required for inspection. following inspection of the restoration by the Engineering Call 775-2525 Dept. CITY OF EDMONDS ENGINEERINPI DEPAPTIVENT Insp Date, ................ By_� ..................... Remark,�3 . ..... . ..... inspDate ........... ..... By_ ------- ....... ..... r p r, p Date ------ . ........ 3y ............. ..... R ark.sfmq .................. Insp Date ............... By ----------- ........ . .. Rema*rfGTQWCoT7?pfo Final.0(41-5. BY ...... ) ff-r- V-9. ..... CZ�m . ........ . N OT F_ C_01A`[-_U1-T ONA POLE lm�-::;TA . "LL_ PC'5T HEAD I IG ARP��_7�5TGIRI om \'N/00D ARM1 FU'�:)E 100 AMP5, M,6,�S Cot,�ME-C-TI,C)�-A (,P'-: CLO,5& C-U-TOLIT Du OF 2f PLA,,ZTT I C_ DLY___T- �=)L �F_ .LA,--v` ?_�;Y77' �C_NZL�_7 MAKF—:.- P 0, TRAMt)FORNAER - -7 5 1-, 1 /7 2- — 2_47�, I alzc_ \JCx- U =E(:gFD\AD- F1 POLE. OA_:R�AE AD 1-\WF= 0. �,HEKAXT� D�_:_AICD 0 0 IVATIC, UNDERGROUND MATERIAL FORM CREDIT STOCK IS�UE DATE 197�_ DELIVER TO. SUPPLIES Labor Accounts Install Transfer Remove P.G. EQ. & MAT., COND. GROS. 8t RODS. SERVICES TRANS. & CUT-OUTS Uj 100 N - C,:�c)-7 0 < z LIJ Uj _j j U 0 a- (L Q �z Ut U 0 0 w CL LL LL < () 2 CC Z ch 0 w w Uj Code Acct. S U B Prop. nit Quantity Iss. Ord. Material Code Acct. S Prop. Unit Quantity 1w Ord. Material 90 220 GROUND ROD 5/BX6* 77 743 No. 2 PR I. SPLICE 88 070 GROUND ROD CLMPS. 49 L.B.C.O. 77 761 1/0 SPLICE 87 730 C.O. BKT. 34 FUSE 77 G01 PEDESTAL -SEC. 25. 762 NYLON INSULINER 78 585 88 SL SEC. CONN. 13AR 88 776 1 J-HOOK 78 578 33 SL SEC. CONN, BAR 92 C) KELLUM GRIP 'i� M(ZM 78 579 44 SL SEC. CONN;- BAR 78 581 55 SL SEC. CONN. BAR 76 A 12 STAND OFF BKT. 78 612 LUGS 2/0 AL, COMP. 76 132 PIPE CLMPS, 2" 78 614 LUGS 410 AL. COMP. 76 134 PIPE CLMPS. 3" 78 616 LUGS 350 4L� COMP. 76, 136 PIPE CLMPS. 4" 78 626 ___5__LUGS 500 AL. COMP, 78 522 PLUGS 33 SLEEVE LAG SCREWS 78 523 PLUGS 77 SLEEVE 78 524 PLUGS LP SLEEVE 25 030 10' 2" RIGID CONDUIT 78 506 COVER L&SLEEVE 25 032 3" RIGID CONDUIT 78 507 COVER L7 SLEEVE 78, 508 5 COVER L8 SLEEVE 25 002 1" PLASTIC DUCT 78 502 LO D.E. COVER 25 005 2" PLASTIC DUCT 25 007 3" PLASTIC DUCT 25 009 4" PLASTIC DUCT 25 GRND. BUSH. 2- STEEL90OX '2f 76 200 VAULT TRANS. 2X2 25 PLASTIC 90ox 25 4- STEEL TO PLST. ADAPT. 2-" 38 523 WARNING STICKERS 76 230 STANDOFF INS. 77 70+ POTHEAD No. 2 77 709 POTHEAD 1/0 76 111-7 POTHEAD BKT.:O�,.) 48 257 LIGHTNING ASSTR. 77 722 STRESS CONE No. 83 211 WIRE No. 2 AL. PRI. 77 723 STRESS CONE 1/0 84 512 WIRE No. 2 CU. PRI. 83 212 IRE 1/0 AL. PRI. 76 240 4 TERM J-BOX 76 238 2 WAY J-BOX 83 389 WIRE 4/0 AL. SEC. 83 386 WIRE 350 AL. SEC. 83 220 WIRE 500 AL. SEC. 78 532 No. 2 ELBOW 78 535 1/0 ELBOW 83 306 No. 8 AL. DUPLEX 22 159 6 AMP. ST. LT. FUSE 31 240 No. 159 S.E. SLEEVES 77 606 600 AMP PLUG CONN. 31 260 ST. LT. FUSE HOLDER 77 610 600 AMP PLUG D.E. 71 130 D.B. STEEL ST. LT. STO. 76 125 No. 2 D.E. CAP 70 G.'LUMIRE. REIMBURSIBLE MATERIAL NO. TRANSF.-7r;,K\1N"7,')4'.1 Lj FILLED lvl'��I`IERIAL RECEIVED MATERIAL CODE CP'ECKED w (A S.R. NO.- Dall"ork Completed_ by Foreman Work Order No. I.I.G.-46:570 765 12-7-73 98-1 /Vork Authorizea uy I. - Lim - 4--7 - -L--T URD COND KV JOINT— 7EL-, �I� -T.\/. ADD CKT FT PH WATER— RP-11-47 REM CKT FT PH SEWER — NET CKT FT GAS— VCIM7Y w d, ON.