Loading...
24208 FIRDALE AVE.PDFiiiiiiii iiiiii 11304 24208 FIRDALE AVE V CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 40 so 35/45 30 60 25/30 20 40 co Ch 0 - k o p Co c6 e I CNI >C cc 242 S7- SW ft _16bb.. Pilchuck Job #107012522 6 Feb 02 Sheet 1 / 1 J. Buss National Barricade Co U P_ NO a) IQ a 10 Notes: 1. All signs and spacing shall conform to the MUTCD and City of Edmonds specs. 2. Work zone is 25'w/o Firdale AVE & 11' n/o c/l 242 ST SW 3. Flaggers will control alternating one-way traffic on 242 ST SW only. 4. Ale'rt.affected residents. 5. Channelizing devices are 28" cones. 6. All signs are 48" x 48" B/O unless otherwise specified. jr�,) - 0 ROAD) WORK 0 AHEAD Z W , 20-1 T NOT TO SCALE RIGHT -OF City of Edmonds? Permit No: WAY CONSTRUCTION PERMIT IssueDate: 00' A. Address or Vicinity of Construction: 0 B;_ specific): e- ,�)ype of Work (be. Li � F_xAe_yx & o e-w In- -_7� 75 ' V. CL, t�v C�0 (2.14- &P 4+ C. Contractor:\Dt�Pi�d�iuo_L 60yx� Contact: Mailing'Address: Phone:,:W9` 44�1 41�)9 0-i-H wcx_ q �6_ State License #: 101 —IrR 6- A: i.le 6; 1 aFiIii371iNurdrice: Bond: D. Building Permit # �if applicable): Side Sewer Permit # (if applicable): E. F� Commercial' Subdivision City Project E] EUC (PUD,-GTE; PSE, CHAMBERS, OVWD) Multi -Family E] Single Family F] Other fNSPECTOR- F. PAVEMENT: YES F� NO G. SIZE OF CUT x H. Charge: $ CONCRETE CUT: F-1 YES F� NO ,Its IDEMNITY.- Applicant understands by hislher signature�l is application helshe holds the City of Edmonds harmless`ftzon� inj'uries',' damages or claims of an . y kind or description wha tsbever, foreseen or unforeseen, that may be made against the City ;. ofjEd?�-onds or dny of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfqes by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLEFOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL'—o' INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. Traffic control and public safety shall be in accordance with City regulations as required by the City Prigineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the,end of the workday — NO EXCEPTIONS., Three sets of construction drawings of proposed work are required with the permit application. I RA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENE-V AND ACKNO WLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: Date: _0 (Contractor or Agent) CALL DIAL -A -DIG (1-800'424-5555) PRIOR TO BEGINNING WORK 'FOR ClTrUW ONLY A'Oproved by -a Right;-of-wayFee:. "it.- 'fter Disruption,'Fee/Fund I It; !Time AuthorizedP V7t-oil 6A, 1$pecia1ConditioRs,-_­ jw-IA-itj 51 Restoration Fee: �eP63F_ A I- TotalFee:- hA_-Ter,_ �-gon!�miz�s. If Str,��m)AL4 S96T(ook Receipt No Y, -doe: F-mAign, rr4myr" W jrUti 4jbk�.5, VP��9;61ssued b 0-1 01`trl� g4dtodgLL Juwc retaw4- V UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAI INSPE'CTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMpT CC tDE W A FINAL APPROVAL OF PERMITTED WORK.-- I I % A a I A INSP&,,*ORW61�iTURE DATE: /111,21 ffv For inspection requirements see Engineering Information Handout. V SCALE - I" - 50' EOM 150V, +/-467q LOC A PROP 2" PE EP MAIN \NIV I 50V LOC PROP 2" PE IP MAIN A45 LOC 2"X 90 ELL 150V, I I'N LOC STANDARD NCC GAS CONSTRUCTION NOTES: 1. FIELD LOCATE ALL UNDERGROUND UTILITIES. CALL "ONE— CALL" TWO WORKING DAYS'PRIOR TO CONSTRUCTION, 1-800-424-5555. 2. ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS STANDARDS PROCEDURES MANUAL. 3. INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. 4. ANY CHANGE IN ROUTE, TIE—IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY PROJECT MANAGER. 5. COMPLETE "PIPE CONDITION REPORT" ON ALL EXPOSED EXISTING PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 6. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARDS 14.2 AND 14.5. 7. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARDS 10.3 8. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS STANDARDS PROCEDURES P0201 AND P0303 AND PSE GAS OPERATING STANDARD 10.2. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 9. REFER TO PSE GAS OPERATING STANDARD 6.8 FOR MAIN AND SERVICE COVER REQUIREMENTS. 10. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 6.14 AND 6.17. 11. CUSTOMER TO PROVIDE ALL TRENCHES ON PRIVATE PROPERTY PER PSE STANDARDS. 12. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 13. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEM, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY A PSE REPRESENTATIVE. 14. SYSTEM MAOP DENOTED BY SYSTEM MAOP 45 — PSIG. 15. COORDINATE INSTALLATION WITH CORROSION CONTROL _E2 _VOQ9_T__!9_6_=:_3.26=Z!QL- 2" SVC TEE +/-I 1'N, 25V LOC VICINITY MAP CONSTRUCTION FITTER (CHECK BOX IF COMPLETE) Work area left in Clean & Safe condition Complete all Pipe Tables and Gas Pressure Stamp El Field changes Red —Lined on as —built ID Material verified and Changes noted on paperwork All Valve & Tie—in Locations noted on as —built Note beginning of Main, EOM & Line of Main locations Show Rope Locations & Cul—de—sac Radius Foreman's Signature Company Employee ID# GAS MAIN INSTALLATION RETIREMENT I R SIZE PROP.FT- ACTUAL FT. TYPE MANUFACTURER 2" 160' PE PROJECT PHASE NOTIF # ORDER # GAS MAIN 107012522 X073144529 SERVICE 1106079792 1 xq71q7c*t?- I I ' CNAIZ� �/!A[N-FIRLE�S-`�Jjl - I TYPE TEST:, PRESSURE; TESTED BY: DATE ON: TIME ON: DATE OFF: TIME OFF: DESIGN: 60 PSIG MAOP: 45 COST CODES: -CONSTRUCTION 011 —' 103-1 Terry Wagner 24208 Firdale AV Edmonds, WA 98020 206-542-3559 CALL 1-800-424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES 5 REAL ESTATE/EASEMENT Req'd PERMIT EDMONDS 4 3 FUNCTION NAME PHONE NO DATE 2 PROJECT MGR: DOUG USITALO (206) 418-4236 01/31/02 1 ENGINEER: REV# DATE BY DESCRIPTION DRAWN BY: PEGGYSHULL (206) 418-4253 01/31/02 COUNTY SNO EMER SEC 5 Work Center MCNS EG CHECKED BY: DOUG USITALO (206) 418-4236 APPROVED BY: DOUG USITALO (206) 418-4236 1/4 SEC SE-36-27-3 OP MAP 1 164.062 PLAT MAP 1 167.067 MAPPING: 1 1( JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE <@>PUCET SOUND ENMW DESIGNED BY PILCHUCK COWRXM, INC., Terry Wagner 2" PE IP MAIN EXTN 24208 Firdale AV Edmonds, WA 98020 107012522 1 SCALE: 1* - 50