Loading...
250 4TH AVE S (3).PDFiiii, 11111111 5066 250 4TH AVE S "D PLANNING DATA."\ New Commercial Proiefts' SITE ADDRESS: Z� ZONING: USE(S) PROPOSED: ALLOWED?: LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (Y/N) CUP File: —To Allow What Uses?: ADB FILE #: -ADE2 ­191-7 6 PARKING: Use: Of V1 t No. Spaces Required: 1/4-00 X' (floor area, # employees, etc.) = Use: No. Spaces Required: X (floor area, # employees, etc.) = Use: No. Spaces Required: X (floor area, # employees, etc.) = Use: No. Spaces Required: X (floor area, # employees, etc.) = Total Required: 1/1, Actual Provided: zt-0 SETBACKS: Required Setbacks: Front: Q5- Left Side: Right Side: /0 Rear: Actual Setbacks: Front: Z) U Left Side: I C-:) Right Side: Rear: Street map checked for additional setback required?���(Yes/No) MAXIMUM FLOOR AREA: Maximum Allowed: Actual: BUILDING HEIGHT: Maximum Allowed: ActualHeight: Modulation Allowed?: Modulation Height: z Datum Point: Datum Elevation: I/yo-.0 Elevator Penthouse > 3 feet over height limit? If so,VAR# LANDSCAPING: .65 Matches ADB a=roved: t-1114or— 1 f4 A K17 koh:�-- Bid Provided? Bond Amount (100% bid): DATE: PLAN CHK#:_',I',/ NAME OF BUILDING PERMIT APPLICANT: N1u-_)CL_4'0H OmCE &-_,D6-7 Continued ... 1Ahbrary\^P1andatNewComm.doc PROJECT DESCRIPTION: 7 K 1-5- Zot--1 E7 1p MCC 1H 0 r,4p-(6tmt-,. ADB FILE #: 97— 1 (,o OR DATE WAIVED: PLANS MATCH APPROVED PLAN: SUBDIVISION: 1 7& I O� CRITICAL AREAS #: SEPA DETERMINATION: D H,!5 - SHORELINE REQUIRED?: N� LOT AGGREGATION REQUIRED?: REDUCED SITE PLAN (8.5Xll) PROVIDED FOR STREET FILE? OTHER: Plan Review By: + -f,--�ot4D 6 .9 1Alibrary\APlandatNewComm.doc 09 40 & 9 0 . I o 9 - City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be fifled out by any person preparing a Development Permit Application for the City of Edmondsprior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any . potentiat Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, A;4 and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in coWunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: /Z all;1i4A, *'/4 Name Street Address zt-k 779--5T7�� City, State, ZIP Phone Signature Applicant Representative: Name Street Address City, State, ZIP Phone —Date gignature Date 0 cAku_r_- NO. %itical Areas Checklis /1 A - QV_ �, t& 14-1 Site Information (soils/topography/hydrology/vegetation) 1. Site Address/Location: 2. Property Tax Account Number: R12 7-0 3 000<? 3. Approximate Site Size (acres or square feet): 7 5'� 130 7571? 4. Is this site currently developed? no. _�Lyes; If yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows *_ross the grounds surface? Flows are year- round? k10 Flows are seasonal? �-IU (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: �,A-2 _for City Staff Use Only Site is Zo nM? 2.:.�.:.�SCS mapped soil type(s Z&yq-� .... Waland inventory or C.A. map indicates wetland present on site?. 44­ ni tical: Areas inventory or C.A. map:�indicaties Critical Area on site? . ..... ........... ... ... wi ide: hazard area) :Site: 'thin designated earth subsidence1andsli .. — designated on the Environmentally: Sensitive Areas Map9 . .. .. .... ... ... . .... .. DETERMINATION STUDY REQUIRED CONDITIONAL WAIVER __4,,:��_WAIVER Reviewed by:.. . ... .. ..... - \<_-Pinner Date Rcv01/004 It* itical CA IWO. A rm -n f6,n i- le 1; + . /1 11 - 19V �- M� 1-4-el, Site Information (soils/topography/hydrology/vegetation) 1 Site Address/Location: 2. Property Tax Account Number: 000<? 3. Approximate Site Size (acres or square feet): 7 5�( 130 4. Is this site currently developed? K no. --L—yes; If yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( 4,vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: k10 Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows agaross the grounds surface? Flows are year- round? A)O Flows are seasonal? VO (What time of year? Site is primarily: forested urban landscaped (lawn,shrubs etc) meadow 11. Obvious wetland is present on site: Y')r shrubs mixed .. ... .. . City Staff Use Only 1__ Site is Zoned? 77 A"- 2....:,:..SCS mapped soil type(s)l Z&*^,--- :3 .. ....... Wetland inventory or C.A. map indicates wetland present on site?, 4." "'Critical Areas inventory or C.A. map indicates Critical Area on site? S. Site within designated earth subsidence landslide hazard area? X)o 6__ ..... Site designated on the Environmentally Sensitive Areas Map9 DETERMMATION STUDY REQUIRED ___,4:'--'WAIVER �Reviewed by:. \,zz:*1a'nner CONDMONAL WAIVER LZZL49 & Date Rcv01/04(94 00 & 90 - 199- City of Edmon& Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, XP and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in CoWunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: Name Street Address City, State, ZIP Phone Applicant Representative: Name Street Address City, State, ZIP Phone I Signature Date Signature Date 0 a 9 * - 19 " - 0 Ar. Lie, Nf; Criticat Are''a""'s�-'Ch6ck-list The Critical Areas Checklist contained on ads fbrm is to be filled out by any person preparing a Development Permit Application fo ' r the City of Edmondsprior to his/her submittal of a development pwrnit to the City. - The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to compleft the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and3ubmit it to ft City. ne City will review the checklist, malm a precursory site visit, and malm a determination of the subsequent steps necessary to complete IL development permit application. With a signed copy of this form, the wolicant should also submit a vicinity Map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). addition, the applicant shall Include other pertinent information (e.g. site plan, topography map, etc.),or studies in .conjunction with this Checklist to assidt staff In completing their preliminary a wment of the site. I have wmpleted the Ittached CridcW Area Checklist and attest that the answers provided am factual, zo the best of my knowledge (fill out the appropriate column below).' Owner / Applicant: Za 1? 4. VI-z--Z i2XI-le-.7 Nam ;�5­0 11Z"a44e Stma AddrM F64 �ga 4,4 Z?9-5-9;Y ,,Z city, state, ZIP Phono Dam Applicant Representative: 0 ;e.s NUM SUVMA Ad&m city, &ate, ZIP sigma= Date I Critical Areas Checklist e .7r7 011 eg ormation (soilshopography/hydrology/v on Site Inf L Site�Address/Location- A 5­0 .4/ cc. Nu'mb Tax A ount' er- P 2 Property' g2-o.3, 3. Approximate Site Size (acres or square feet): `7 4. Is this site currently developed? -X—Yes; no. IC4 If yes; how Is site'developed? OL graph 5. Describe the general site topo y Che'& all'that app y. Flat: less than 5-feet elevation change over entire site. K Rolling: slopes -on site generally less d,= 15% (a veitical rise of 10-feet over, a horizontal distance of 66-fed). Hilly: slopes present on site of more than 15% and less than 30% ( jv4rticafrise of 10-feet over a horizontal distance of 33 to 66-fea). Steep: grades of greater than 30 % present on site (a vertical rise of I Veet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal stabding water: Approx. Depth: What season(s) of the year? .8. Site is in the floodway floodplain' Atb of a water courm 9. Site contains a creek or an area where water flows agXoss the grounds surface? Flows are year- round? LI-0 Flows are seasonal? VU (What time of year? 10. Site is primarily: tbrested meadow _; shrubs mixed urban landscaped (lawn,shrubs, 11. Obvious wetland is present on site: al� Staff use 01,4Y 77 van . t.dry or d+premtoasit Ll C.A. mp indi wii1in A _A.'=p.%di'Wa QifiW Arm on sitc? P.4 tim mvect,60 or C W Within i�"9+­M,t" m** subsidiii4i:16drAW fi� ArW th� Eh on VIVOnmed .. . ....... Al ty to �k N', 7<b -A I Zate K"011004 APPLICATION for 0 The City of Edmonds SEDE SEWER PERMIT EASEMENT No . .......................................... NEW CONSTRUCTION C] REPAIRS E] lol-og600 OWNER................ Rawl -e y. -,...T-r.ac.y ........................................................ CONTRACTOR .................................................................................................. PERMIT No . ...................... ADDRESS........... 2.5.0 ... 4-th ... Axe�* ... z . . ................................................... LEGAL DESCRIPTION: LOT No . ............................... I ............... BLOCK No . ............................................ NAMEOF ADDITION ......................................................................................................................................... Uj .j UL CD Dye Tested On Sewer June, 1972 Approved: DATE................................................ By ...................................................................... 890 . 19,91- % V % VN City of Edmonds Critical Area- . s -'Chocklist-". The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. Ile information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and' submit it to the City. The City will review the checklist, make a precursory. site visit, and make a determination -of the subsequent steps necessary to complete a development permit application. With asigned copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent infonnation (e.g. site plan, topography map, etc.) 'Or studies in cogiunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and anest that the answers provided are factual, to the best of my knowledge (fill out'the appropriate column below). Owner I Applicant: 41 ;A1 Name -2,5-0 Street Address Fdong7o,,Wr City, State, ZIP Phone Applicant Representative: 33- Street Address 7-3 9 5>5 City, State, ZIP Phone 17 Signature Date Signature Date FILE NO. *Critical Areas Checklit Site',biformafloP (soil's./.topography/hydrology/vey,(etation) dd I Site, A, ress/Location: 2.4;��' Prop6rty'Tax Account'Number':'A, 97-o3-q-14o�T-ovocl 3. Approximate Site Size (acres or square feet): 75:r,/3071 750 4. Is this site currently developed? yes; no. If yes; how is site' developed) 5. Describe the general site topography': Check alfthai a'pply- Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a v4rti cal rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: kV Approx. Depth: 7. Site contains areas of seasonal standing water: ye� —; Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain A10 of a water course. 9. Site contains a creek or an area where water flows oss the grounds surface? Flows are year- round? klo Flows are seasonal? M (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped Oawn,shrubs etc) 11. Obvious wetland is present on site: I -A d rL" ReVOU004 NOTICE: No warranty of accuracy. The information shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of Edmonds does not warrant the accuracy of anything set forth on these map(s). Any person or entity requesting a copy should conduct an independent inquiry regarding the information shown on the map(s), including, but not limited to, the location of any sewer stub shown. Such sewer stubs may or may not exist and may or may not exist at the location shown. Neither the City of Edmonds nor its employees or officers shall be liable for the information given on map(s), nor for any one representation provided based upon said map(s). d u 0: 0 z C4 W z 0 z 0 z z 0 LO 0 c Oil r-li ;dupe-ndent h1quiry 's;'IA nl -A !to !4,1^1FT.cfl of wri smwr sub busm St& may or n, ay Int exist v,,,,d n, ay or may not exist at ft kcca,Nr, shmin. Neither the CIRy of Ediunds nor Its employees of officers shail bo Rabig tcf the Info!m a -ton given on this map, no; for any oral jepres�nWl on pruAded basecl upon said map. City of Edmonds Traffic Impact Analysis Worksheet Name of Proposed Project: ? &(- Owner/Applicant _��N �_T Name Street/Mailing Address EdVVM&Sj \AJA- 91M city — .1 State Zip Telephone: Applicant Contact Person: Name Street/Mailing Address city Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: THRESHOLD LEVELS OF ANALYSIS Contact Name E-mail: %-9 Z State Zip Project Traffic Levels Sections to Complete 1. Less than 25 peak -hour trips generated I and 7 only (Worksheet/Checklist) 11. More than 25 peak -hour trips generated All sections 1. PROJECT DESCRIPTION a. Location - Street address: Avv-- (Attach a vicinity map and site plan.) b. Specify existing land use: of(l c-e- c. Specify proposed type and size of development: oxq_,�'Ce (# of residential units andlor 5 footage of building) Revised on 6124110 E82 - Traffic Impact Analysis Worksheet Page I of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. Fee for prior use shall be based *on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 iffipact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use u $ x 5 Z, Prior Use -(10 $ X I Z— Fee $7 1 1$ ) � NewUseFee: Prior Use Fee: $ $ 0 NEW DEVELOPMENT ITE Land Use Category Per Unit I Fee Rate New Use El OTHER Units in square feet, # of dwelling, vfp, etc. X I � = . Fee MITIGATION FEE RECOMMENDATION: S INDEPENDENT FEE CALCULATION: $200.QEt consultant fee) $ TOTAL TRAFFIC IMPACT FEE $ City of Division Approval f Z"Zl/ Date No impact fees will be due, nor. will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124110 E82 - Traffic Inipact Analysis Worksheet Page 5 of 5 1:` - 1 - - , oV E Q Af '00 , CJ CITY, OF EDMONDS RECEIVED ISC JUN 2 41999 ENVIRONMENTAL CHECKLIS \ 44,-, DEVELOPMENT SERVICES CTR. %ori CIT CITY OF EDMONDS Purpose of Checklist: The State Environmental Policy Act (SEPA). chapter 43.21C RCW. requires all govcnimcnial agencies to consider the crivironnictital impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable sigrdficant adverse impac(s on the quality of the environment. The purpose of this checklist is to provide inforination to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Ii,"structionsfor Applicants: This crivironnicrital checklist asks you to describe sonic basic information about your proposal. Governmental agencies use this checklist to dcterininc whether the environmental impacts of your proposal arc significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise inforination known, or give the best description you can. You niust answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your o%%­n observations or project plans without the need to hire experts. If you really do no( know (he answer, or if a question does not apply to your proposal, write "do not know" or does not apply". complete answers to the questions now may avoid unnecessary delays later. Sonic qucstions ask about govcrunicrital rcgulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the govcrniiicn(al agencies can assist you. The checklist questions apply to all parts of ),our proposal, even if you plan to do (hern over a period of time or on different parcels of land. Attich any additional inrormation that will help dcscfibc your proposal or its environmental cffccls. The agency to which you subrnit this checklist may ask you to explain ),our answers or provide additional inrormition reasonably related to dc[cmiining if there may be significant adverse impact. Use of checklistfor nonprojectproposals: Conipictc this cliccklist for nonproject proposals, C%-Ctl though questions may be answered "does no( apply," * IN ADDITION, SUPPLE , MENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as .proposcr," and "affected geographic area," respectively. A. BACKGROUND 1. Narne of proposed project, if applicable: 2. 3. Name of applicant: Nickolson Office Buil-ding @ 250 4th Avenue South Brad BuLterfield Address and phone number of applicant and contact person: Brad Butterfield Butterfield Design Group 400 Dayton Street, Suite C, Edmonds, Wash. 980TO 425/775-0564 CHKLTCCC,1-N0%*-91 Page I of 24 0 0 I ; 4. 5. Date checklist prepared: June I , 1998 Agency requesting checklist: City of Edmonds. 6. Proposed timing or schedule (including phasing, if applicable): - Aj)ply ing f or AD13 a ovrova I and a bu i Iding pe rmi t by la te summe r 1998 (STAFF COMMENTS) 7. Do you have any plaus for future additions, expansion, or rurlher activity rela(cd to or connected with this proposal? If yes, explain. Do not know. (STAFF COMMENTS) 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None . (STAFF COMMENTS) 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No . (STAFF COMMENTS) CRUT ' DCCNI-NOV-93 Page 2 of 24 KkMR\SPFA 0 0 10. List any government approvals or permits that will be needed for your proposal, if known. ADII Board approval and buildinp permit - City of Edmonds. (STAFF COMMENTS) IL Give brief, complete description of your proposal, including lite proposed uses and size of the project and site. There are several questions later in this checklist that ask you to dvicribc certain RspCCts of your proposal. You do not need to repeat those answers on this page. Office -Building of approximntely 8,690 ,;.f. (STAFF COMMENTS) 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. Ir a proposal would occur over a range of area, pro%ide range or boundaries of the site(s). Provide legal description, site plan, Vicinitv map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans sub'mitted with any permit applications related to this chccklisL Property Address: 250 Fourth Avenue South Ednionds, WA 98020 (Legal Description Attached) (STAFF COMMENTS) P.- I -kI IA 0 - 0 TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1. Earth - a. General descrip(ion of the site (circle one): 171,11, rolling, hillY, steep SIOPcs, mountainous, other: Flat to sloping. (STAFF COMMENTS) 1). What is the steepest slope on (he site (approximate percent Slope)? The property slopes from 0' to Vin 130' (loss than 7%) (STAFF COMMENTS) C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricul(ural soils, specify them and note any prime farmland. See aLtarlipd- (STAFF COMMENTS) d. Are (here surface indications or history of unMable soils in the immediate vicinity? If so, describe. N o . (STAFF COMMENTS) 01KLT ' DWI-NOV-93 Page 4 of 24 NLkMR11SPF#k 0 0 C. Describe the purpose, type and approximate quantities or any filling or grading proposcd. Indicate source or fill. See at tached . (STAFF COMMENTS) Could erosion occur as a resul(of clearing, construction, or use? irso,gcncrallydescrille. No . (STAFF COMMENTS) 9. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Approximately 71%. (STAFF COMMENTS) h. Proposed measures to reduce or control erosion, or other impacts to the earth, ir any: See attached. (STAFF COMMENTS) 2. Al It IL What types of emissions to the air would result from the proposal (i.e., (lust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. Possible dust during construction, no emissions after project is complete, other than automobiles. (STAFF COMMENTS) Cli�T DC-CNINOV-41 Page 5 of 24 0 1). Are (here any off -site sources of emissions or odor that may cffcc( your proposal? If so, generally describe. N o . (STAFF COMMENTS) C. Proposed measures to reduce or control emissions or other impacts to the, if any: None (STAFF COMMENTS) 3. WATER a. Surface: (1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal s(reams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. if appropriate, state what stream or river it flows into. No . (STAFF COMM ENTS) (2) Will the project require any work over, in, or adjacent to (within 200 feet) (he described waters? If yes, please describe and attach available plans. N o . (STAFF COMMENTS) (3) Estimate the amount of rill and dredge material that would be place(] in or r(!mo%-(!(f front surface water or wetlands and indicate the area of the site that would be affected. Indicate the source or rill material. None . (STAFF COMMENTS) MUT * DCOI-NOV.93 Page 6 of 24 PLAUMMSPEA 0 0 (4) Will file proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quanti(ics if known. N o . (STAFF COMMENTS) (5) DOCS (fie proposal lie within a 100-yearnoodplain? If 30, note location on the site plan. B.ased oil the Feb. 19, 1986 Flood Insurance Rate Map, no portion of the pruject lies within the 100 year f loodplain (STAFF CONIMENTS) (6) Does tile propoiai involve any discharges of waste materials to surface wafers? If so, describe the type of waste and anficipa(ed'volume of discharge. N o . (STAFF CONIAIENTS) b. (;round: (1) Will ground water be withdrawn. or will water be discharged to ground water? Give general description, Purl)OsC, and approximate quantities if known. N o . (STAFF CONII%IENTS) , 'r r*-w'% I vAt. - Pa ve 7 nf 7.1 (2) Describe waste material that will he discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing (he following chemicals ... ; agricultural; etc.). Describe the general size of the system, tile number or such systems, the number of houses to be served (if applicabic), or the number of animals or humans the systcm(s) arc expected to serve. None . (STAFF COMMENTS) C. Water Runoff (including storm water): (1) Describe file source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this waternow? Will this waternowinto other waters? If so, describe. See attached. (STAFF COMMENTS) (2) Could waste materials enter ground or surface waters? If so, generally describe. See attached. (STAFF COMMENTS) d. Proposed measures to reduce or control surface, ground, and runoff water imllac(s, if any: See attached. (STAFF COMMENTS) CMUTD001-NOV-93 Page 8 of 24 MASTERWFA 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other:. x evergreen tree: Fir, cedar, pine, other: x shrubs X grass - pasture - crop or grain wct soil plants: cattail, buttercup, bulrush, skunk cabbage, other: water plants: water lily, eclgrass, milfoil, other: other types of vcgc(a(ion: (STAFF COMMENTS) b. What kind and amount of vcgc(ation will be rctnovcd or aftered? The existing grass and marginal shrubs will be replaced with new landscaping which will meet the E.C.D.C. landscape reuuirement. (STAFF COMMENTS) C. List threatencd or cndangercd species known to be on or near the site. None . (STAFF COMMENTS) Page 9 of 24 d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation On the site, if any: The existing grass and shrubs will be replaced with new 1aiidscaDi11R WhiCh Will Meet Lhe L.G.D.C. landscape requirenient. (STAFF COMMENTS) 5. Animals a. Check or circle any birds an(] animals which have been observed on or near (he site or are known to be on or near (he site: None . birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: (STAFF COMMENTS) h. List any threatened or endangered species known to be on or near (he site. No ne . (STAFF COMMENTS) C. Is the site part of a migration route? If so, explain. N o . (STAFF COMMENTS) CHUT D001-90V-93 Page 10 of24 WASnRWEA 0 0 d. Proposed measures to preserve or enhance wildlife, if any: None . (STAFF COMMENTS) 6. Fnergy and Natural Resources a. What kinds or energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will he used for healing, manufacturing, C(C. Electric, natural gas for heating and lighting. (STAFF COMMENTS) b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No. (STAFF COMMENTS) C. What kinds of energy consen,ation features are included in the plans of this proposal? Lis( other proposed measures to reduce or control energy impacts, if any: This project will meet all requirements of the energy codes. (STAFF COMMENTS) OWLTDC01-MOV43 Page I I of 24 7. Environmental Health a., Arc there any environmen(al health hazards, including exposure to toxic chemicals, risk or fire and explosion, spill, or hazardous waste, that could occur as a result or this proposal? ir so describe. (STAFF COMMENTS) (1) Describe special emergency sen-ices (hat might be required. None . (STAFF COMMENTS) (2) Proposed measures to reduce or control environmental health hazards, if ally: None (STAFF COMMENTS) b. Noise (1) What types of noise, exist in file area which may affect your project (for example: traffic, cquipmen(, operation, other)? None . (STAFF COMMENTS) Page 12 of 24 C14KLT MOI-NOV-9) MASTEPLISPEA 0 (2) What types and levels of noise would be created by or associated with (lie project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the si(e- Short-term: Typical construcLion noises during construction hours. (7:00a.m.to 4:30 p.m.) (STAFF COMMENTS) (3) Proposed measures to reduce or control noise impacts, if any: No n e. (STAFF COMMENTS) 8. Land and Shoreline Use a. What is the current use or (lie site and adjacent properties? Current use is single-family resi:dence with a C.U.P. for office. Adjacent properties are single-family residences and multi- family residences and multi -family complexes and business uses with C.U.P. and PA.D. substation. (STAFF COMMENTS) b. Has the site been used for agriculture? If so, describe. N o . (STAFF COMMENTS) rage 13 of 24 C. Describe any structures on (fie site. Sitiple familv residence. (STAFF COMMENTS) d. Will any structures be demolished? If so, what? Single fainily residence. (STAFF COMMENTS) C. What is the current zoning classification of the site? R1.1 1.5 - Multiple Residential - High Density. (STAFF COMMENTS) f. What is the current comprehensive plan designation of the si(e? R H 1 . 5 (STAFF COMMENTS) g. If applicable, what is the current shoreline master plan designaflon of the site? N / A (STAFF COMMENTS) Page 14 or24 CHUT ' DCOI-NOV43 KA.SnRXSPEA 0 0 h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No . (STAFF COMMENTS) i. Al)l)ro]LiM2tC[y how many people would reside or work in the completed project? Do not know. The project will provide off-street parking as per tile square fooLage parking requirements for the building occupan : ts per the E.C.D.C. (STAFF COMMENTS) i. Approximately how many people would the completed project displace? None . (STAFF COMMENTS) k. Proposed measures to avoid or reduce displacement impacts, if any: 14 / A (STAFF COMMENTS) 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 'Fliis project is compatible with existing andprojected land uses and plans. (STAFF COMMENTS) Page IS of 24 rmLLTnmi.Nov.q1 1 0 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. (STAFF COMMENTS) b. Approximately how many units, if any would be eliminated? Indicate whether high, mid0e, or low- income housing. None . (STAFF COMMENTS) C. Proposed measures to reduce or control housing impacts, if any: None . (STAFF COMMENTS) 10. Aesthetics a. What is (lie talicst height of any proposed struchirc(s), not including antennas; what is (lie principle exterior building matcrial(s) proposcd7 30' tall with Pitched roof is themaximuni height allowed as per the E.C.D.C. Exterior materials of cedar shingles for exterior walls. (STAFF COMMENTS) CHUT ' DWINOV-93 Pap 16 of 24 KkMp%Spr-A 0 - 0 1). What views in the immediate vicinity would be altered or obstructed? None . (STAFF COMMENTS) C. Proposed measures to reduce or control aesthetic impacts, if any: —Approval of aesthetics by the Edmonds Architectural 6esipn —Board required to continue this project. (STAFF COMMENTS) Light and Glare a. What tvpco'f light or glare will the proposal produce? What time of day would it mainly occur? None . (STAFF COMMENTS) b. Could light or glare front the finished project be a safety hazard or interfere with views? N o (STAFF COMMENTS) C. What existing off-sitc sources of light or glare may affect your proposal? Do not know any. (STAFF COMMENTS) Poge 17 of 24 0 d. 11roposcd measures to reduce or control light and glare impacts, if any: None . (STAFF COMMENTS) 12. Recreation a. What designated and informal recreational opportunitici are in the immediate vicinity? City parks, Puget Sound beaches, City recreation center, private athletic club. (STAFF COMMENTS) b. Would (lie proposcd project displace any existing recreation uses? ir so, describe. N o . (STAFF COMMENTS) C. Proposed measures to reduce or control impacts on rccrcafion, including recreation opportunifies to be provided by (lie projcct or applicant, if any: Notle . (STAFF COMMENTS) Page IS of 24 C"UTD001-NOV-93 MAMMSPEA 13. Historic and Cultural Preservation a. Arc there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. No . (STAFF COMMENTS) b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to (he site. None . (STAFF COMMENTS) C. Proposed measures to reduce or control impacts, if any: None . (STAFF COMMENTS) 14. Transportation a. Identify public streets and highways serving (lie site, and describe proposed access to the existing street system. show on site plans, if any. Public streets at project are: 4th AvQnue South, Dayton and Walnut Streets. (STAFF COMMENTS) Page 19 of 24 0 0 1). Is site currently served by public transit? If no, what is the approximate distance to the nearest transit Stoll? One block. (STAFF COMMENTS) C. How many parking spaces would the completed project have? How many would the project clintina(c? 22 Parkitig spaces. (STAFF COMMENTS) d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). N o . (STAFF COMMENTS) C. Will the project use (or occur in (lie innnediate vicinity of) water, rail, or air transportation? If so, genet -ally describe. (STAFF COMMENTS) Page 20 of 24 CHKI.T.CC01-NOV-93 "MRISPEA 0 0 f. How many vehicular trips per day would be generated by (lie completed project? If known, indicate when peak volumes would occur. Approximately 8690 s.f. (gross) with required parkinp per E.C. D.C. of 22 standard parking stalls, including ( 1) H.C. accessable. Approximately 40 vehicular trips/day with peak times during normal business hours of 9:00 a.m. - 5:00 p.m. (STAFF COMMENTS) g. Proposed measures to reduce or control transportation impacts, if ally: Tile primary incentive to control trips is due to building design and location. The building location is easily accessible by public transportation. (STAFF COMMENTS) 15. Public Sen-ices a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. Normal fire and police protection. (STAFF COMMENTS) b. Proposed measures to reduce or control direct impacts on public services, if any: Project will meet or exceed all current fire code requirements for new buildings. (STAFF COMMENTS) Page 2 1 of 24 16. Utilities a. Circle titilifies curren(ly available at (lie site: a n i t y sciveDsel)(ic system, other: (STAFF COMMENTS) b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Snohomish Coun ty P . U . D . , Geric ra 1 Telephone Co . , Washing ton Natural Gas, City of Edmonds Sewar System (STAFF COMMENTS) C. SIGNATURE The above answers are true and complete to (lie best of my knowledge. I understand that the lead agency is relying on them (o make its decision. Signature of Proponent Date Submitted Page 22 of 24 CHUT.D001-NOV-93 KkMF0SPF-k 0 0 ATTACHMENT TO CITY OF EDMONDS ENVInONMENTAL CHECKUST B. I ENVIRONMENTAL ELEMENTS- Earth c. What general 01)es of soils are found on Me site (for eximple clay. sand, gravel, peal. inuck)? 11you know Me classification of agricultural soils, specify them arid note any prin)o farmland. Do not know, no agricultural soils were found on the subject property. e. Describe (lie purpose, 1K)e arid approximate quantities of any filling or grading proposed. Indicate source of fill. Approximately 3,500 cubic yards of material will be removed for construction of underground parking, and approximately 1,000 cubic yards of filling will be required to adjust suoice elevations to accommodate the drain;3qe and ptirking improvements. Consistent with Community Development Code City ot Edmonds Environmental Section: soils and topography. grading and filling on the silo will proceed In accordance with the following policies: Glading will not jeopardize the stability of any slope or of any adjoining property. Teq1po1irY--%osion-con1to1 measures will be undertaken to reduce erosion during construction. Proposed measures to reduce or ccrilrol erosion, or other impacts to the earth, if any. Drainage protection is proposed around the building ind development areas, with the use of foundation arid toot dtain systems that ninply into a tiUlit-lined stormwiter system. The storin water system will be tied to the existing system in Fourth Avenue South. Erosion protection of the exposed soils areas will benchieved through contlininent of potential tunoff on the site or on the adjacent property. Willi the planling of cleared areas with lawns and shrubs In the landscape areas, post - construction potential for erosion w ill be negligible and Is not expected to exceed pre-consimclion levels. All erosion control measures Imposed by tile City of Edmonds Engineering Department will be followed. 0 0 B.3. ENVIRONMENTAL ELEMENTS- Water C. Water Runoff (including storm water): (1) Oescribe (tie source of runoff (including storm water) and me. thod of collection arid disposal, if any (including quarilifies, if known). Where Mil this water flow? Will this water Ilow into other waters 7 it so, describe. The principal source of runoff will be rainwater and snow n-ielt from root, parking arid landscape Impervious sutfaces. storm water runoff will be collected In a system of catch basins arid underground pipes and conducted to a detention system which will discharge Into Ilia existing storm system on 4th Ave. S. which eventually discharges into Puget Sound. (2) Could waste truterials enter ground or surface waters 7 If so, generally describe. Typical components of storm water from Impervious surfaces such as roads and parking areas and runoff from yard arid other open spaces are petrochemicals, automotive waste products. fertilizers and pesticides. In the completed project. storm water runoff from imperious surfaces on Ilia site will be collected in Ilia catch basin collection system and tr9ated with oil/water separation before being routed to the adjoining storm sewer system for eventual discharge into Puget Sound. Sanitary sewer service will be provided by the City of Edmonds. d. Proposed measures to reduce or control surface, ground, and runoff water Uppacls, it any., During construction temporary nicasures will be employed to control runoff and water quality. including approptiale best nianager-rient practices. in 1110 completed project, oillwater separation and detention will control impact of runoff from impervious suifaces, including those subject to vehicle uses. I'loof runoff is relatively clean and does not generally require water quality treatment. DRAINAGE REPORT FOR THE NICKOLSON OFFICE BUILDING AT 250 4TH AVE. S., EDMONDS WITHIN SEC. 23, TWN. 27 N., R. 3E., W.M. SNOHOMISH COUNTY, WASHINGTON JRR # 99-36 PREPARED FOR: BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 (425) 771-8475 PREPARED BY: RONALD K. RIACH, P.E. d.b.a. JRR ENGINEERING 16030 52ND AVENUE WEST EDMONDS, WA 98026-4724 PN. (425) 787-6020 qli� FAX (425) 742-5221 ? /9 502 1 �he-t 7 0 0 This report has been prepared by JRR Engineering for Bruce Nickolson, as support information for a Commercial Site development within the City of Edmonds. Any revisions to the proposed project may not use or depend upon this report without the written permission of JRR Engineering. City approval for the commercial site will require items which are generally as follows: I . Provide an off -site analysis 2. Identify existing conditions and possible development impacts 3. Show compliance with City code requirements for drainage Calculations and design plans are based on good engineering practice, City of Edmonds code requirements, methods and procedures in the Department of Ecology Stormwater Management Manual for the Puget Sound Basin (1992), and investigation of the existing system in the project area. General Site Description/Condition The subject property (site) consists of one lot totaling approximately 9750 SF (.22 acres) and is located on the West side of 4th Ave. S. approximately 250' North of Walnut Street. Said property has a street address of 250 4th Avenue South, Edmonds, and is within the SE quarter of the SE quarter of the SE quarter of section 23, township 27 North, range 3 East, W.M., Snohomish county, Washington. The site is bounded o ' n the South by a power substation, on the West by an alley with multifamily residential buildings beyond, on the North by a multifamily residential building and on the East by 4th Avenue South. Existine Drainame Existing drainage at and around this site consists of urban runoff. At this time there is no storm drainage system on the site to collect runoff. The existing building on the site utilizes splash blocks and no downstream drainage is currently impacted. No wetlands have been identified on or adjacent to the site. The Project is outside the floodplain and contains no shorelands. On the West and the South edge of property are catch basins that are the collection points for upstream runoff. These catch basin are connected through piping with varying diameters. Flow direction from catch basin to catch basin is determined with existing pipe invert elevations and catch basin rim elevations. Pipe diameter, rim elevation, invert. elevation, and flow direction information can be found on the General Site Plan. A merging point was found in a catch basin located West of the SW comer of the property. 4 15- 0 Proposed Drainage It is anticipated that developed runoff from the site will continue to flow in the Westerly direction as in the present condition. An increase in impervious area is proposed, and runoff from the new commercial site, and the paved access and parking areas will be collected via catch basins and conveyed by a combination of PVC & corrugated high density polyethylene pipe (CPEP) to an oil/water separator which will contain an outlet control tee. The conveyance system will also act as the detention system. Development Impacts The parking configuration, landscaping and drainage improvements are proposed to provide access and parking for the proposed use and improve the collection of surface water runoff on the site. Runoff water quality will be improved by.the installation of a baffle type oil/water separator. No significant erosion has been observed around the existing grading and no significant erosion is. anticipated on the subject property or adjacent properties, due to the proposed development. Post development peak flows are expected to have no significant impact on existing downstream conditions as described in the following off -site Analysis & Downstream Conditions summary information. It is also anticipated that: (1) Modifications to the existing drainage system will not cause runoff to be diverted onto or away from the adjacent downstream property. (2) The proposed improvements are not expected to aggravate an existing drainage problem or create a new drainage problem on adjacent or downstream properties. (3) An oil/water separator with a two orifice control structure is proposed for treatment and for releasing runoff at pre -developed rates (see plan). (4) The proposed project conveyance system will contain and convey the 100-year design storm. (5) The Clearing Limits which are anticipated consist of and coincide with the property lines, which will be marked prior to construction to. indicate and delineate proposed improvements. Erosion/Sedimentation Control Desien Silt fencing, construction entrance and typical cover techniques will be employed to minimize the potential for erosion and sedimentation A complete erosion and sedimentation control plan will be provided in the construction drawing submittals. ;.,_ 4 15 0 0 Off Site Analysis The site is generally at the same grade as the abutting properties, and is generally not affected by toupstream off -site areas". Storm runoff is limited to that which is generated "on -site". Downstream conditions consist of a storm drainage system. Minimal erosion has been observed around the exist ' ing grading. No significant erosion is anticipated on the subject property due to the proposed development. Post development peak flows are expected to have no significant impact on existing downstream conditions. Downstream Conditions Site Visit: June 9, 1999 Weather: Overcast and Dry Observer: Jason E. Schaefer Beginning near the Southwest comer of the site at 250 4th Avenue South: Observer noted an elevation drop of approximately 5 feet from the East to West Edge of property. Numerous catch basins are located at or near the edge of property on the South and West sides. A catch basin is located near the Southwest comer of the property which receives flows from an eight inch diameter pipe from the North and a six inch diameter pipe from the East. Flows continue via an eight inch concrete pipe to the South approximately 30 feet to a type I catch basin, and from this CB through an 8-inch concrete pipe to the West, apparently traveling along a common property line between two multifamily residential buildings and discharging into a catch basin on the East side of 3rd Ave. S. which also collects street runoff from the East side of 3rd Ave. S. The elevation drop from the West Edge of Said Property to this catch basin is approximately 5.5 feet. From this catch basin, a pipe continues in the westerly direction and tees into a storm drain fine running North to South in 3rd Ave. S. This drain pipe travels approximately 570 feet from said catch basin in the Southerly direction to Shelleberger Creek. Along this 570 foot lengthrunoff is received from numerous catch basins and curb inlets and apparently discharges into Shelleberger Creek at its crossing under 3rd Avenue South where the creek is contained within a 24" diameter concrete pipe. On the West side of 3rd Ave. S. the Creek resumes an open channel flow traveling in the Westerly direction. 3 a� 15 Summary of Desi2n Soils: Alderwood Series Hydrologic Group "C" Runoff Characteristics: Existing & Proposed C,: 85 Meadow 98 Impervious surfaces Design Storms: 2 Year Design storm precipitation = 1.5 inches 6 Month Design storm precipitation 1. 5(.64) = .96 inches (Not Used) 10 Year Design storm precipitation 2 inches 100 Year Design stonn precipitation = 3 inches i Pre -Development Condition: Site Area = 9750 SF (.22 ac.) Landscape area = 9750 SF (.22ac.) Impervious Area = 0 SF (0 ac.) 2 Year design storm peak runoff 0 1 10 Year design storm peak runoff = .03 100 Year design storm peak runoff = .07 Post -Development Condition: Site Area = 9750 SF (.22 ac.) Landscape area = 2750 SF (.063ac.) Impervious Area — 7000 SF (. 161 ac.) 2 Year design storm peak runoff = .08 10 Year design storm peak runoff = . I I 100 Year design storm peak runoff 18 Detention Required: 466 W Detention Provided: 466 W tj o f Printed fmm TOPOI 0 1997 Wbffbwer 10 (www.topo.com) I t-k (Tw� HAP 5� -4- 6 �i z r- cQ 0 z 0 0 JRR ENGINEERIN 16030 52nd Avenue West Edmonds, WA. 98026-4724 (425) 787-6020 Fax: (425) 742-5221 HMOS am% HIt I i 6 0 1100 % III At it THE NICKOLSON OFFICE BUILDING job no. 99-36 BRUCE NICKOLSON design RKR 9829 CHERRY ST. drawn JES Opp Ydo RKR EDMONDS, WA 98020 dwg. NICKOLSON/95?— DATE: 6/18/99 (0 0� 0 JRR ENGINEERING 16030 52nd Avenue West Edmonds, WA. 98026-4724 (425) 787-6020 Fax: (425) 742-5221 job n design RKR drawn JES Opp 9 V do RKR dwg. NICKOLSON/TESC 71 i to d t. THE NICKOLSON OFFICE BUILDING BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 DATE: 6/18/99 ENONEERiNq & PIANNiNq SERViCES 16030 52nd Avenue WeSte Edmonds. WA 98026-4724 (425) 745-1766 * Fax (425) 742-S221 Project I a r6mK 11:k it a^&. eA 4— 1.6 46 odar&+al y fft. '04 Cp, . -rAA. 251 O.IAOV P)01 m4p ^C/.-CA45 or 4-sA se-f ;,e s 6a 4, Aan 7 S-0 so,$ F (T-9u.%t 7000SF (.)(.1 lot.' r 100 yr 12- i M, Mile, eit I�w 7 (44zy AleACA VJ if 129 .37 1 f. 711= li I ?-X. � 0 �05 L-� Sheet 'S oF / 0 - SHEET NUMBER 56 z (Joks iftet C. doesif 341 R- -1 F- plirlu * L:VUIN-1 I 2E rl C%d 1,-: 2 MILES i -15 1 4 :i z rl- c*3 cla 6 0 z 0 pC4 0 I MA HlnOS aMaAV Hl* NJ w-- ft�� ,I �04lk Vi a3AOMV 38 OL 3Srl0H OHLLSDG JS 00$pt . zg 4 ,if I a //fi' r JRR ENGINEERIN THE NICKOLSON OFFICE BUILDING 16030 52nd Avenue West job nQ6.— 99—H BRUCE NIC I KOLSON Edmonds, WA. 98026-4724 dealgri MR (425) 787-6020 &3" AS 9829 CHERRY ST. Fax: (425) 742-5221 app*Vd" RKR EDMONDS, WA 98020 dwv- 'RcML'oNM3c DATE: 6/18/99 .10 0� Is SPECIFY STORM OPTION: 1 S.C.S. TYPE-lA RAINFALL DISTRIBUTION ENTER: FREWYEAR), DURATION(HOUR), PRECIP(INCHES) 2,24,1.5 ---------------------------------------------------------------------- S.C.S. TYPE-lA DISTRIBUTION .2-YEAR 24-HOUR STORM **** 1.50" TOTAL PRECIP. ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .22, 85, 0, 98, 19.25 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .2 85.0 .0. 98.0 19.3 PEAK-Q(CFS) T-PEAK(HRS) VOL (CU- FT) .01 7.83 359 ENTER [d:][pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: nic2pr ------------- ---------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .063,86,.161,98,1.1 DATA PRINT-OUT: AREA( . ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .1 86.0 .2 98.0 1.1 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT). .08 7.,67 861 ENTER [d:1[pathjfilename[.ext1 FOR STORAGE OF COMPUTED HYDROGRAPH: nic2po SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP I I Orr )s' ;C.S.' TYPE-lA RAINFALL DISOBUTION :NTER: FREQ(YEAR), DURATION(HOUR), PRECIP(INCHES) .0,24,2.00 ---------------------------------------------------------------------- S.C.S. TYPE-lA DISTRIBUTION 10-YEAR 24-HOUR STORM **** 2.00" TOTAL PRECIP. ---------------------------------------------------------------------- ZNTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .22,85,0,98,19.25 F__ DATA PRINT-OUT: J,--K I S 7- AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .2 85.0 .0 98.0 19.3 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .03 7.83 633 ENTER [d:1[path]filename[.ext1 FOR.STORAGE OF'COMPUTED HYDROGRAPH: niclOpr SPECIFY STORM OPTION: 1 S.C.S. TYPE-3-A RAINFALL DISTRIBUTION ENTER: FREQ(YEAR), DURATION(HOLJR), PRECIP(INCHES) 100,24,3.00 ---------------------------------------------------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .063,86,.161,98,1.1 .063,86,.161,98,1.1 r DATAPRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .1 86.0 .2 98.0 PEAK-Q(CFS) T-PEAK(HRS) VoL(Cu_FT) .11 7.67 1231 ENTER (d:][pathlfilenamel.ext) FOR STORAGE OF COMPUTED HYDROGRAPH: niclOpo SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP n STORM OPTIONS: I - S.C.S. TYPE-lA 2 - 7-DAY DESIGN STORM 3 - STORM DATA FILE SPECIFY STORM OPTION: . /Z d 1'5� S.C.S. TYPE-lA DISTRIBUTION 100-YEAR 24-HOUR STORM **** 3.00" TOTAL PRECIP. ..; ---------------------------------------- ; ------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .22,85,0,98,19.25 DATA PRINT-OUT: loo YEA R ARKA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) .2 .2 85.0 .0 98.0 19.3 PEAK-Q(CFS.) T-PEAK(HRS) VOL(CU-FT) .07 7.83 1263 ENTER Ed:][pathlfilename[.ext) FOR STORAGE OF COMPUTED HYDROGRAPH: nicloopr woe -- - - - - - - - - - - - - - - - - - - - ENTER: A(PERV), CN(PERV), A(IMPERV). CN(IMPERV), TC FOR BASIN NO. 2 .,063,86,.161,98,1.1 DATA PRINT-OUT: Io c - oye- AREMACRES) PERVIOUS IMPERVIOUS TC(MINEITES) A CN A CN .2 .1 86.0 .2 98.0 1.1 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .18 7.67 1998 ENTER [d:][pathlfilenamel.ext] FOR STORAGE OF COMPLITED HYDROGRAPH: niclOOpo SPECIFY: C CONTINUE, N - NEWSTORM, P - PRINT, S - STOP 13 dr- 19 is SUMMARY OF INPUT ITEMS 1) TYPE OF FACILITY: TANK 2) TANK DIAMETER(ft), STORAGE DEPTH(ft): 3.00, 3.00 3).VERTICAL PERMEABILITY(min/in): .00 4) PRIMARY DESIGN HYDROGRAPH FILENAME: niclOOpO. 5) PRIMARY RELEASE RATE(cfs):. .07 6) NUMBER OF TEST HYDROGRAPHS: 2 TEST HYD, I FILENAME: nic2po TARGET RELEASE(Cfs): .01 TEST HYD 2 FILENAME: niclOpo TARGET RELEASE(cfs):. .03 7) NUMBER -OF -ORIFICES, RISER-HEAD(ft), RISER-DIAM(in):' 2, 3.00, 8 8) ITERATION DISPLAY: NO ENTER ITEM NUMBER TO BE REVISED (ENTER ZERO IF NO REVISIONS ARE REQUIRED): ..... ..... ... . /Y BOTTOM ORIFICE: ENTER Q-MAX(CfS) .012 .4157 DIA.= �&t INCHES TOP ORIFICE: ENTER HEIGHT(ft) 1.65 DIA.- 1.36 INCHES PERFORMANCE: INFLOW TARGET -OUTFLOW DESIGN HYD: .18 .07 TEST HYD 1:1 .08 .01 TEST HYD 2: .11 .03 SPECIFY: D - DOCUMENT, R - REVISE, ROUTING DATA: ACTUAL -OUTFLOW PK-STAGE STORAGE .07 Z-99 3,0 +661130 -olt90 .01 i. I'va *6 .03 1.88 9-&62M A - ADJUST ORIF, E - ENLARGE, S - STOP STAGE(FT) DISCHARGE(CFS.) STORAGE(CU-FT) .00 .00 .0 .30 .00 24.3 .60 .01 66.5 .90 .01 117.9 PERM-AREA(SQ-FT) .0 .0 .0 1.20 .01 174.6 .0 1.50 .01 233.7 .0 1.65 .01 263.4 .0 1.8,0 o3 292.8 .0 2.10 .04 349.4 .0 2.40 2.70 .05 .06 400.8 443.0 .0 .0 3.00 .07 467.4 .0 3.10 .28 467.4 .0 3.20 .66 467.4 .0 3.30 3.40 1.00 1.14 467.4 467.4 .0 .0 3.50 1.27 467.4 .0 AVERAGE VERTICAL PERMEABILITY: o.MINUTES/INCH SPECIFY: F - FILE, N - NEWJOB, P - PRINT IF/OF, R REVISE, S STOP 3,3 2- (,;q 44' 2-. q5,. Z. f 4 3 ok VS4 600, pw_ -F 15- 'V6 A May: 25, 1999 Buffettield Design Gtoup 400 Dopon Edmonds, Washington 98020 T61: 425.775.0564 Fax: 425.776.5746 Jeannin 'Graf e City. of Edmonds *Community Services Dept. Building Division 1215 1h Ave. N. Edmonds, WA 98020 th Reference:* Nickolson Office Building/4 Ave. South Dear Jeannine: Regarding submittal of construction-documbnts for thqabove referenced project, -enclosing a letterfrom Steve per our conversation with Lara Knaak, we are Bullock'which states that application for a building permit.is the only th.ing that will vest the Conditional Use Permit. It is our understanding that the City has agreed to. allow us to submit the geotechnical soil test after removal of the building currently occupying the property. If there are any further questions or clarifications, please contact our office immediatelyso we can resolve any issues that would'imppct the July 2,. 999, expiration of the Conditional Use Permit for this project. Sincerely, Bradley J. Butterfield UP BUTTERFIELD DESIGN GRO Cc: Ray Miller Bruce Nickolson 09 r 0 Inc. a MONDS CITY OF ED 121 SM AVENUE NonTH - EDMONDS. WA 98020 - (425) 771-022U - FAX (423) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Plannhig - Buildhig - Engineering Monday. May 10, 1999 Brad Butterfield Butterfield Design GlOuP 400 Dayton St. Edmonds, WA 98020 BARi3ARA FAHEY MAYOR L)car Brad: This letter is ill 1cply to your qucstion-5 of when your cuff ent Conditional Use Permit expires and if you may apply for another extension. I talked with ilic Planuing Supmisor, Jeff Wilson, aj)out the expiration of tile Conditional Use pcillil( (cull) for your project on 4'h Ave. S. and ieviewing tile code and previous decisions, we reached tile conclusion that application for a building pcitnit is tile only thing that will vest tile CUP ill your situation. The decisions issued on this Conditional -Usc Pe"llit also limit it to one extension. This all adds up to tile expiration Of (Ile appioved CUP on July 2 of this year. I'm soff y I don't have wlY better "ews- have on tilis issue. cc: street file for 316 Main St. Glaf, Jeanninc Feel free 10 contact Ile will, ally questions you might 0 inromorotedAuQU51 11. 1890 9 TUTPL P.02 CITY OF EDMONDS BARBARA FAHEY MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planninn/Buildinri e Parks and Recreation En-ineering 9 Wastewater Treatment Plant it, C. S'4'� Transmittal R E cria. 1, V E D Date: July 16, 1998 JUL 16 1998. To: Brad Butte rfield 5NGINEEi9ING Subject: CU-97-31 Transmitting PLANNING DIVISION EXTENSION REQUEST DECISION For Your Information: -X As you requested: For your file: Comment: Note attachments: X Sincerely, CC: B. Bruce Nicholson Ct—ng -iri-eeri —ng. Drviis­lorl�' Fire Department Parks Division Planning Division Public Works Division Sharla Graham, Administrative Assistant 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 0 0 CITY OF EDMONDS 121 5TH AVENUE NORTH, EDMONDS, WA 98020 PLANNING DIVISION EXTENSION REQUEST DECISION To: File # -97-3 From: v ;Stev ullock, AICP Senior Planner Date: JULY 15,1998 File: CU-97-31 1. INTRODUCTION A. Application 1. Applican : Brad Butterfield, Butterfield Design Group (see Attachment 2). 2. Site Location: 250 4h Ave. S. (see Attachments I and 2). 3. Regues: An extension of an approved Conditional Use Permit to allow an office building in an RM- 1.5 zone. 4. Review Process: Extension of Time, Planning Staff makes final decision. 5. Major Issues: a. Compliance with Edmonds Community Development Code (ECDC) Chapter 20.05.020.0 (CONDITIONAL USE PERMITS — General Requirements). b. Compliance with Edmonds Community Development Code (ECDC) Chapter 20.95 (Application and Staff Review). B. Description of Proposal The applicant has submitted a letter requesting an extension to their Conditional Use Permit which was issued July 2, 1997. C. Decision Based on statements of Fact, Conclusions and Attachments in this report, we approve the extension request. II. FINDINGS OF FACT AND CONCLUSIONS A. Request 1. Facts: 1h a) The extension request was filed prior, April 15 , to the expiration date, July 2d, of the originally approved Conditional Use Permit. It has been filed in a timely manner. b) The code allows for one 1 -year extension for approved Conditional Use permits. 9703 1 xtn.doc / July 15, 1998 / Staff Report Funtasia File No. CU-98-30 Page 2 of 2 2. Conclusion: a) The extension should be granted. III. RECONSIDERATION AND APPEALS The following is a summary of the deadlines and procedures for filing reconsideration's and appeals. Any person wishing to file or respond to a recommendation or appeal should contact the Planning Department for further procedural information. A. Request for Reconsideration Section 20.100.010.G allows for the Hearing Examiner to reconsider his decision or recommendation if a written request is filed within ten (10) working days of the date of the initial decision by any person who attends the public hearing and signs the attendance register and/or presents testimony or by any person holding an ownership interest in a tract of land which is the subject of such decision or recommendation. The reconsideration request must cite specific references to the findings and/or the criteria contained in the ordinances governing the type of application being reviewed. B. Appeals Section 20.105.020.A & B describe how appeals of a Hearing Examiner decision or recommendation shall be made. The appeal shall be made in writing, and shall include the decision being appealed along with the name of the project and the date of the decision, the name of the individual or group appealing the decision, their interest in the matter, and reasons why the appellant believes the decision to be wrong. The appeal must be filed with the Community Development Director within 14 calendar days after the date of the decision being appealed. IV. LAPSE OF APPROVAL Section 20.05.020.0 states'Unless the owner obtains a building permit, or if no building is required, substantially commences the use allowed within one year from the date of approval, the conditional use permit shall expire and be null and void, unless the owner files an application for an extension of the time before the expiration date.' V. APPENDICES V Attachments I throug�y- 1. Vicinity and Zoning Map 2. Extension request VI. PARTIES OF RECORD Brad Butterfield Butterfield Design Group 400 Dayton St. Suite C Edmonds, WA 98020 B. Bruce Nicholson 9829 Cherry St. Edmonds, WA 98020 Engineering Division Planning Division Fire Department Public Works Division Parks Division 9703 1 xtn.doc / July 15, 1998 / Staff Report �j WTTERFiELD DESIGN GROUP 400 Dayton Street, Suite C Edmonds, Washington 98020 Telephone: 425/775-0564 Facsimile: 425/776-5746 April 15,1998 Mr. John Bissell Community Services Department 121 Fifth Avenue North Edmonds, Washington 98020 Re: Conditional Use Permit Number CU-97-31 Dear Mr. Bissell: RECEIVED APR 15 1998 COMMUNITY SERVICES We have been issued a Conditional Use Permit of our project at 250 Fourth Avenue South. That permit expires on July 2, 1998. We respectfully request an extension on that permit, as our other projects in Edmonds have delayed development of that site. We intend to proceed with our ADB permit forthwith. If you require further information on this request, please contact me. Sincerely, Brad Butterfield JH cc: Mr. Bruce Nickolson Sep-14-99 09:53A 0 P . 0 1 BUTTERFIELD DESIGN GROUP TRANSMITTAL To: Company: - Date: project: Mossago: RECE IVED SEP 14 mg Cj T _'. I Vic-, I [v% orler W� .4e I mezi A 4 P'A�L ea*a -k;fow 44, k um u —ALI 6. *_ �& I FROM: ATTACHMENTS: CC: :42.5.1 10-ar— ds. VVA 98020 Telephone: 4251775-0564, Fax y1on Sirool. Edmon �Lx -4 1 A740 �ST R N Ta L . 11 , 6" 0 7 .9. j - V�e, I A Z V4 OARA r2 Cp, 10 I or- N lie2 3. 4,9 IH& 'j�MSYIE3.EVWSTAJR N( PVA'- � 04r,4 I C) els CITY OF EDMONDS SIDE SEWER PERMIT 18 90 - PERMIT ��10 9151 Address of Construction: Property Legal Description (Include all easements): Owner and/or Contractor: State License No. 11 Single Family 11 Multi -Family (No. of Units-) ?KCommercial Public Building Permit No. .r, //..� e �?009U 3 EDMO E Invasion into City Right -of -Way: El No L; ATMEN ..9 RW Construction Permit No.= _LL Cross other Private Property:,E5,No 'El Yes Attach legal description and copy of recorded easement I cO� �yal*fiave read and sh'aA comply with all city requirements as indicated on the back of the Permit Card. * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3N ",UBLIC ORKS DEPT. Permit Fee: 30 t S Issued By Trunk Charge: zo Date Issued: I f Assessment Fee: Receipt No.: Lid No.: - Partial Inspection: nu� 9fl) _/6 co 4 J 0 Date 61 nitial - Comments Reason Rejected: Date -Initial Final Inspection Approved: Datel-22-01 lnitialt;-�' .1 PERMIT MUST BE POSTED ON JOB SITE White Copy; File Green Copy: Inspector Buff Copy: Applicant Re�,sed 3190 (b < The City of Edmonds Side Sewer Drawing 10 EASEMENT NO . ............................................ NEW CONSTRUCTION REPAIRS LID NO . ................... ASMT. NO . .................. OWNER....................................................................... ........................ CONTRACTOR ..... ....... ns. t! ....................................... PERMIT NO. Tk.- -5, ..... . ...................... JOB ADDRESS ....... 1.4 ..... T (Zi 00 3 > FR r", I,', f, on �J, prop,,� I;. ry i IT 0 0 PWW-0001-11/75 (REV.11/78) T C, U) c LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . .................................... NAMEOF ADDITION ....................................................................................................................... goo. 0 Approved: DATE...... /Z�� .............. By ....... C4� ................... RECEIVED MAR 0 6 2000 oEVELOPMENT SERVICES CTR. WY OF EDMONDS Ms. Maryanne Zukowski Traffic Engineer Community Services Department Engineering Division City of Edmonds 00 121 5th Avenue North Edmonds, WA 98020 Re: Nickolson Office Building Traffic Impact Analysis L 5 0=0 ENGINEERS / SURVEYORS / PLANNERS / DEVELOPMENT (ONSULTANTS March 3, 2000 LSA No. 4141 LA C-D e'l rip) C 0 q*y(y' 14 P'K The purpose of this letter is to provide traffic information regarding the proposed Nickolson Office Building, a proposed commercial building to be located in downtown Edmonds. The proposed building location is on the west side of 4 1h Avenue S north of Walnut Street. The proposed structure will have two occupied stories and a lower level dedicated to parking. The front of the building faces 4 Ih Avenue where a driveway is located. The building garage entrance will have a second entrance on the alley west of the building. Trip Generation The total number of vehicle trips expected to be generated by the project were determined using the ITE Trip Generation Manual, 6th Edition, 1997. The expected trip generation is gross building square feet. Traffic would be generated primarily by employees, visitors and deliveries. The expected trip generation from the proposed building is shown in Table 1. The net trip generation is that of the proposed new structure less that of the existing house located on -site. Trip Distribution The projected trip distribution for the 84 ADT and 12 p.m. peak hour trips generated by the project is shown in on Figure 1, Trip Distribution. Since trip generation is primarily staff and visitors, most of trip distribution is expected to be on arterials accessing areas of residential land use. The trip distribution indicates that half of the traffic will access the site via SR-104 south of Edmonds. The remainder of the traffic is expected to travel by major routes to and from north, major routes to and the east, and a smaller portion diffused through the City of Edmonds surface streets. No segment of the WSDOT road system will have 10 or more project generated AM or PM peak hour trips. Traffic to and from the east could use the intersection of 5th and Dayton as an alternative route. The estimated maximum number of trips through this intersection is 8 ADT and 1 p.m. peak hour trip. Lovell-Sauerland & Associates, Inc. 19400 33rd Ave. W., Suite 200. Lynnwood, WA 98036 800-775-7663 425-775-1591 425-672-7998 fax I i % Mr. Maryanne Zukowski MAR 0 6 2000 DEVELOPMENT SERVICES CTR. March 3, 2000 CITY OF EDMONDS Page 2 Total Average Weekday Trips (ADT) Office Building less 10 ADT from existing house ................................... 84 AM Peak Hour Trips Office Building less existing house .............................................. 13 Inbound Trips (88%) ......................................................... 12 Outbound Trips (12%) ........................................................ 1 PM Peak Hour Trips Office Building less existing house .............................................. 12 Inbound Trips (17%) ......................................................... 2 Outbound Trips (83%) ........................................................ 10 1. Trip rates are average rates from the ITE Trip Generation Manual, 6th Edition Traffic Mitigation The City of Edmonds has a traffic concurrency mitigation program whereby the City has identified projects designed10 maintain an acceptable level of service within the City. The City has an ongoing review. VVith this trip generation and distribution 4nfQrmat*Qn- the City will determine if the Droiect meets the threshold for voiect related traffic imr)acts. Therefore —the aDDlicant is not Drovidina traffic miticiation at this time. Sincerely, Dale B. Watkins, P.E. APA" 23395 *10 X, NAL 313100 [�IRE31' / S 030S LEGEND XX% = % DISTRIBUTION' INECEIVED XX = AVERAGE WEEKDAY TRIPS MAR 0 6 2000 XX = PM PEAK HOUR DEVELOPMENT TRIPS C4Ty OF SERVICES CTR. 'EpA4ONt)S EDMONDS 9/v <) sl ui EDMONDS CITY LIMITS- WOODWAY CITY LIMITS Q:�ro ERBENIDR PINE ST. L P4 19- CASPERS ST 25% 21 2 35%. 10% 29 8 3 MAIN ST 1 DAYTON ST 10% 8 WALNUT ST HOLLY DR HOMELAND DR 50 42 HEMLOCK WY 5 2E_AMONT LN 04 TRAFFIC GENERATION 50% NET WEEKDAY ADT ................ 84 4 A2, 5 NET PM PEAK HOUR ............ G NICKOLSON BUILDING TRAFFIC DISTRIBUTION MAP FIGURE NO. 1 NO. 4141 "TREET FILE 2000 DEVE-Irjph"ENT SF E '�� C '3 CITY OF Jog C GEOTECHNICAL ENGINEERING STUDY THE NICKOLSON OFFICE MELDING 250 FOURTH AVENUE SOUTH EDMONDS9 WASHINGTON -G- 1166 Prepared for Gram Construction Services, Inc. 1506 Tenth Place North Edmonds, Washington 98020 January 25, 2000 Geo Group Northwest, Inc. 13240 NE 20th Street, Suite 12 Bellevue, Washington 98005 Phone: (425) 649-8757 Geotechnical Engineers, Geologists Eel r9] Group Northwest, Inc. & Environmental Scientists January 25, 1999 G-1 166 Mr. Greg Mummy Gram Construction Services, Inc. 1506 Tenth Place North Edmonds, Washington 98020 Subject: Geotechnical Engineering Study The Nickolson Office Building 250 Fourth Avenue South Edmonds, Washington Dear Mr. Mummy: Geo Group Northwest, Inc., is pleased to present our geotechnical engineering study report for the site referenced above in Edmonds, Washington. The purpose of this study was to evaluate the geotechnical issues regarding the proposed construction of a new three-story office building at the site. These issues include earthwork guidelines, foundation support, slab -on -grade floors, drainage, and pavement subgrades. These services have been provided in accordance with the terms of our proposal dated January 14, 2000 PROJECT DESCRIPTION The site is located on the west side of the 200 South block of Fourth Avenue in the downtown neighborhood of Edmonds, Washington. The site is currently developed with a single -floor wood-fi-ame building that is a former residence converted to an office. The location of t�e site is shown on Plate I - Vicinity Map. We understand the existing building will be removed from the site or demolished, and a new. three-story office building (two stories of office space over an at -grade parking garage) will be 13240 NE 20th Street, Suite 12 a Bellevue, Washington 98005 Phone 425/649-8757 e FAX 425/649-8756 0 January 25, 2000 G-1 166 Mr. Greg Mummy - Gram Construction Services, Inc. Page 2 built on the site. The proposed development is expected to involve minimal grading, although a limited amount of fill will need to be placed at the east end of the site. The location of the existing site features and an outline of the proposed new building location are illustrated on Plate 2 - Site Plan. The proposed grading for the project is shown on Plate 2A - Development Plan. Foundation loads are expected to be typical for this type of building. SCOPE OF WORK The purpose of this study is to provide geotechnical recommendations for the proposed development of the site. . Our scope of work included the following: Excavated four exploratory test pits at the site using a backhoe, The test pits were located near the comers of the site, at the direction of Gram Construction. The test pits were completed to depths of 7.5 to 8.5 feet below the ground surface. Both borings were logged by an experienced-Geo Group Northwest geologist and soil samples were collected for laboratory testing for moisture content at our office; Performed engineering analyses for foundation support, slab -on -grade garage floor, and earthwork and grading considerations; Prepared this geotechnical report of our activities, findings, conclusions, and recommendations for the design and construction of the proposed office building at the site. SITE CONDITIONS Surface Conditions The site is a rectangular property that measures 75 feet by 130 feet and is located in downtown Edmonds, Snohomish County, Washington. The site currently is developed with a vacant single - floor office building converted from being a residence. Geo Group Northwest, Inc. January 25, 2000 G- 1166 Mr. Greg Mummy - Gram Construction Services, Inc. Page 3 The site is relatively flat, but has a small slope (about 3 feet high) that drops from FourthAvenue to the site. Site elevations range from approximately 115 feet in the east part of the site to I I I feet in the west part of the site. Vegetation on the site generally consists of grass lawn area on the east, south, and west sides of the existing building, fiuit trees and planter beds in the west part of the site, and some shrubbery along the north side of the site. We understand the site will be redeveloped as a new three-story office building that will occupy essentially the entire site. The building will consist of an at -grade parking garage with a concrete slab floor, and two floors of office space above the garage. The proposed finished floor elevations in the parking garage range between 114 feet in the east part and I I I feet in the west part. Anticipated building -loads are understood to be typical for buildings of this type. ' We understand that grading of the site will consist of minimal cutting and filling. - Up to about 3 feet of fill will be needed in the east part of the site for the grade transition between the parking garage and the street. Subsurface Exploration Subsurface site conditions were evaluated by excavating four exploratory test pits (TP- I through TP4) at the site on January 18,,2000. The test pits were excavated under the supervision of a Geo Group geologist by using a backhoe. The test pits were completed to depths of 7.5 to 8.5 feet below ground surface. The loc ' ations of the test pits are shown on Plate 2 - Site Plan. Test pit logs and a legend describing the soil classification system and other nomenclature used on the logs are presented in Appendix A of this report. Soil samples were collected from the test pits for analysis for moisture content. The analysis results are presented. on the test pit logs. Soil Conditions Subsurface soils encountered in the borings consist of a layer of topsoil between I -and 2 feet thick in each of the test pits. The topsoil was very dark grayish brown in color and contained roots to about 6 to 12 inches below ground surface. Medium dense to dense mixtures of sand, silty sand, and silt were encountered below the topsoil layer in each of the test pits. These native soils typically were damp to moist, and exhibited variable degrees of rust -colored oxide staining in the sandier layers and around gravel clasts. The sand and silt layers typically exhibited weak Geo Group Northwest, Inc. January 25, 2000 G-1 166 Mr. Greg Mummy - Grain Construction Services, Inc. Page 4 to moderate degrees of bedding. At depths of 2 to 4 feet, however, the soils were typically moist to wet due to the presence of seepage. In test pits TP-3 and TP-4, a layer of dense to very dense, damp, grayish fine to medium grained silty sand with gravel was. encountered below the bedded sediments at depths'of 6 to 7 feet and extended to the bottom of the test pits. These dense, unsorted soils appeared to be glacial till. In test pit TP-2, occasional lenses of unsorted silty sand with gravel were noted at 5 to 7 feet below ground surface, but were situated between layers of bedded sand and silt immediately above and below. No unsorted, till -like soils. were encountered in test pit TP- 1. Groundwater Conditions Water seepage was encountered in the test pits, typically at depths of 2 to 3 feet during our exploration. The seepage was typically located in the uppermost part of the native soils. Moderate to heavy seepage, resulting in some limited caving of the test pit walls, was observed in test pit TP- I in the northeast comer of the site. Light seepage with minimal to no sloughing or caving was observed in the other three test pits. CONCLUSIONS AND RECOMMENDATIONS General In our opinion, the site is geotechnically suitable for the proposed development. The proposed building can be supported on conventional spread footings that bear directly on the dense, native soils, or on structural fill or lean -mix concrete that is placed directly on the dense native soils. Based on the soil conditions encountered during our investigation, it is our opinion that the topsoil layer and the wet loose to medium dense soils present to depths of 2 to 3 feet below existing ground surface are unsuitable to support the proposed building, sidewalks, and pavements. These soils will need to excavated down to the dense, native soils and replaced with a free -draining structuraI fill material (such as a free -draining pit.run or crushed rock)approved by the geotechnical engineer. Ile depth of removal of soft subgrade soils in the- sidewalk and pavement areas can be limited to 12 inches. Geo Group Northwest, Inc. 0 January 25, 2000 G-1 166 Mr. Greg Mummy - Gram Construction Services, Inc. Page 5 We also recommend that an exterior foundation footing drain system be installed around the building to drain water seepage away from the building. The footing drain pipe should be placed at the elevation of the bottom of the footing. Our detailed recommendations for use in the design and construction of the project are presented in the following sections of this report. Site Preparation and Earthwork We anticipate that earthwork at this site will generally consist of the following tasks: clearing and grubbing of the existing vegetation and improvements, removal of the topsoil layer, excavation to dense native soils in the building area, excavation of up to 12 inches of soft wet soils in sidewalk and pavement areas, replacement of over -excavated areas with structural fill material, and placement of up to about 2 feet of additional structural fill east of the building to build the driveway to the street. The on -site soils typically contain a high percentage of fines (silt) and are highly moisture - sensitive. These soils also tend to have higher than optimum moisture contents, because of the presence of water seepage at depths of about 2 to 3 feet. It is possible that the depth to dense soils mayvary somewhat in areas that have been disturbed by previous development (such as the existing building area, the vicinity of the mature trees on the site, and possible on -site sewerage systems). These areas may need fin-ther over -excavation and backfilling. The on -site soils will be highly susceptible to disturbance (softening and rutting) by construction equipment when exposed during construction. If subgrade,disturbance occurs in the building, sidewalk, or pavement areas, the disturbed soils shpuld be replaced with compacted structural fill. We recommend using imported material consisting of clean sand and gravel with less than 5 percent fines (material passing the U.S. Standard #200 sieve by weight relative to the fraction of material passing the 3/47inch sieve). Structural fill should be placed in lifts eight to 10 inches in .loose thickness and should be compacted to at least 95 percent of the maximum dry density in a ccordance with ASTM D-1557 Compaction Test Procedure. If the on -site soils have near - optimum moisture contents, are free of organics and debris, and can be successfully compacted to the required degree, they can be used as structural fill during dry weather conditions. Geo Group Northwest, Inc. 0 0 January 25, 2000 G- 1166 Mr. Greg Mummy - Gram Construction Services, Inc. Page 6 Structural Fill All structural fill material used to achieve design site elevations below the building area and below non -structurally supported sidewalks, driveways, and patios, should meet the requirements for structural fill. During wet weather conditions, material to, be used as structural fill should have the following specifications: 1. Be free draining, granular material containing no more than five (5) percent fines (silt and clay -size particles passing the No. 200 mesh sieve); 2. Be free of organic material and other deleterious substances; 3. Have a maximum size of three inches in diameter. All fill material should be placed at or nearits optimum moisture content. The optimum moisture content is the water content in soil that enables the soil to be compacted to the highest dry density for a given compaction effort. We anticipate that the on -site material will be unsuitable in its existing condition for use'as. structural fill, especially during wet weather, due to its high moisture content and silty natu re. During dry weather, however, the on -site soil may be used as structural fill, provided the material is near its optimum moisture content for compaction purposes. It should be noted that an imported granular fill material may provide more uniformity and be easier to compact to structural fill specifications than the on -site silty soils. If the on -site soils are to be used as engineered structural fill, it will be necessary to segregate the topsoil and any other organic- or debris from the soil. Also, the soil will need to be moisture' . conditioned to bring it near to its optimu M moisture content for compaction. The soil' will need to be protected (such as by covering it with plastic sheeting) from weather and from contamination with unsuitable materials until it is used. Structural fill should be placed in thin horizontal lifts not exceeding ten inches in loose thickness. Structural fill placed in areas with slopes greater than 15 percent shall be placed on, horizontal benches cut into dense soil, to prevent possible later lateral movement. Structural fill under building areas (including foundation and slab areas), should be compacted to at least 95 percent of the maximum density, as determined by ASTM Test Designation D- 1557-91 (Modified Geo Group Northwest, Inc. 0 0 January 25, 2000 Mr. Greg Mummy - Gram Construction Services, Inc. G-1 166 Page 7 Proctor). Structural fill below sidewalk and driveway areas should be compacted to at least 90 percent of the maximum density. We recommend that Geo Group Northwest, Inc., be retained to evaluate the suitability of. structural fill material and to monitor the compaction work during construction for quality assurance of the, earthwork. Building Foundations The proposed building can be supported on conventional spread footings that bear directly on the dense native soils, or on structural fill or lean -mix concrete that is placed directly on the dense native soils. Based on the findings from our soil investigation at the site, we anticipate that medium dense to dense, native soils are present at approximately 2 to 3 feet below the existing -ground surface in the proposed building location. Soft soils present below the foundation footing locations should be over -excavated down to dense, native soil. The footings then can be extended to the depth to the dense soils, or the over - excavated areas below the base of the footings can be replaced with compacted structural fill. Alternatively, the over -excavated areas below the foundation footings can be backfilled with lean -mix concrete. Individual spread footings may be used for supporting columns and strip footings for bearing walls. Our recommended design criteria for these foundations are as follows: - Allowable bearing pressure, including all dead and live loads Dense native soil 2,000 psf , Compacted structural fill = 2,000 psf - Minimum depth to bottom of perimeter footing below adjacent final exterior grade = 18 inches - Minimum depth to bottom of interior footings below top of floor slab = 12 iiiches - Minimum width of wall footings = 16 inches Geo Group Northwest, Inc. January 25, 2000 G- 1166 Mr. Greg Mummy - Gram Construction Services, Inc. Page 8 Minimum lateral dimension of column footings = 24 inches - Estimated post -construction settlement = Y2inch - Estimated post -construction differential settlement; across building width = %inch A one-third increase in the above allowable bearing pressures can be used when considering short-term transitory wind or seismic loads. Lateral loads can also be resisted by friction between the foundation and the supporting compacted fill subgrade or by. passive earth pressure acting on the buried portions of the foundations. For the latter, the foundations must be poured "neat" against the existing undisturbed soil or be backfilled with a compacted fill meeting the requirements for structural fill. Our recommended parameters are as follows: Passive Pressure (Lateral Resistance) - 350 pcf equivalent fluid weight for compacted structural flll - 350 pcf equivalent fluid weight for native dense soil. Coefficient of Friction (Friction Factor) - 0.35 for compacted structural fill - 0.35 for native dense soil We recommend that footing drains be placed around all perimeter footings. More specific details of perimeter foundation drains'are provided in the "Drainage Considerations" section of this report. Slab -On -Grade Floors To avoid moisture build-up on the subgrade, slab -on -grade floors should be placed on a capillary break, which is in turn placed on the prepared subgrade. The capillary break should consist of a minimum of a six (6) inch thick layer of free -draining crushed rock or gravel containing no more than five (5) percentfiner than No. 4 sieve. A vapor barrier, such as a 6-mil plastic membrane, is recommended to be placed over the capillary break beneath the slab to reduce water vapor Geo Group Northwest, Inc. 0 January 25, 2000 Mr. Greg Mummy - Gram Construction Services, Inc. transmission through the slab. Two to four inches of. sand may be placed over the barrier membrane for protection during construction. G- 1166 Page 9 Prior to placing the capillary break, the barrier membrane and.the concrete for slabs -on -grade, we recommend the final subgrade be proof -rolled with a piece of heavy construction equipment. Any soft spots or disturbed areas detected should be re -compacted or excavated, replaced and compacted. Drainage Considerations The finished ground at the site should be graded such that surface water is directed off the site. Water should not be allowed to stand in any area where footings, slabs or pavements are to be constructed. During construction, loose surfaces should be sealed at night by compacting the surface to reduce the potential for moisture infiltration into the soils. Final site grades should allow. drainage away from the building. We suggest that the ground be sloped at a gradient of three (3) percent for a distance of at least ten feet away from the building except in areas that are to be paved. Groundwater seepage was encountered at depths of 2 to 4 feet in. the test pits excavated on site. The observed seepage at test pit TP- I in the northeast comer of the site was moderate to heavy, and the test pit walls were subject to caving. Light to moderate seepage and minor caving were observed in test pit TP-2 near. the southeast comer of the site. Based on these observations, we anticipate that groundwater seepage at the site may be significant where grading or excavations for footings intersect seepage zones. Any seepage that does occur during construction should be collected by ditching that drains to a sump from where the water can be removed. We recommend that a foundation drain system be installed around the outside of the building foundation. The drain system should be constructed of perforated PVC pipe a mui miu'm of 4** inches.in diameter (larger if significant seepage is encountered in the excavation) and surrounded with a layer of washed gravel drain rock or crushed rock. The PVC pipe should be placed along the base of the footing. A non -woven geotextile such as Mirafi 140NL, or other, as approved by the geotechnical engineer, should be placed between the drain rock (or crushed rock) and backfill soils to prevent movement of soil into the drain material. A generalized illustration of a typical footing drain detail is presented in Plate 3 - Typical Footing Drain. Please note that backfill soils placed below sidewalk and pavement areas need to meet structural fill requirements. Geo Group Northwest, Inc. January 25, 2000 G- 1166 Mr. Greg Mummy Grain Construction Services, Inc. Page 10 The foundation drains should be connected to tightUnes that discharge into the storm sewer disposal system. Under no circumstances should roof downspout drain lines be connected to the footing drainage system. All roof downspouts must be separately tightlined to discharge into the storm water collection system. We recommend that sufficient cleanouts be installed at strategic locations to allow for periodic maintenance of the footing drains and downspout tightlines. Pavement Subgrades We recommend the driveway area subgrade be prepared as described in the Site Preparation and General Earthwork section of this report. Following removal of the topsoil layer, pavement areas that have soft, we4 or unstable subgrade soils should be excavated to a depth of 12 inches below proposed pavement subgrade elevation, and the excavated area should be backfilled with free - draining structural fill or crushed rock and compacted following the recommendations in the "Structural Fill" section of this report. Areas of soft, wet or unstable subgrade may still exist after this process. If so, over -excavation of the unsuitable material and replacement with compacted structural fill or crushed rock may be required. LEWITATIONS This report has been prepared for the specific application to the proposed construction at this site as described in this report, and for the exclusive use of Grain Construction Services, Inc., and its authorized representatives. Third-partY reliance on findings, conclusions, or recommendations in this report will be at that party's sole risk. We recommend that this report be included in its entirety in the project contract documents for reference during project design and construction. Our findings and recommendations stated herein are based on field observations, our experience and judgement. The recommendations are our professional opinion derived in a manner consistent with the level of care and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area and within the budget constraints for this project. No warranty,' expressed or implied, should be understood. Variations in subsurface soil or groundwater conditions are possible in areas between exploration locations and may also occur with the passage of time. In the event that.subsurface conditions are found to vary from those anticipated, Geo Group Northwest, Inc. should be notified and the conclusions and recommendations in this report should be re-evaluated. Geo Group Northwest, Inc. 0 January 25, 2000 Mr. Greg Mummy - Gram Construction Services, Inc. ADDITIONAL.SERVICES G-1 166 Page I I We 'recommend that Geo, Group Northwest Inc. be retained to perform wreview of the final design and specifications for the proposed development to verify that the geotechnical recommendations provided in this report are properly interpreted and incorporated into the design and construction documents. We also recommend that Geo Group Northwest Inc. be retained to provide monitoring and testi rig services for geotechnically-related work during construction, including earthwork activity, foundation, sidewalk, and pavement subgrade verification, and drainage installation. A Geo Group Northwest, Inc., representative should observe geotechnically-related construction work for compliance with the geotechnical recommendations in this . report, and should be available to discuss and recommend design changes, it needed, in the event substance conditions differ from those anticipated prior to the start of construction. The scope of these services does not include monitoring construction safety measures, nor directing the contractor's methods except as specifically described in this report. Respectfully Submitted, &&A^dL& NM -#'� Geo, Group Northwest Inc. CA 20114 'UNAL Keith Johnson William Chang, PE LOMS 21191 Z,40,j Geologist Principal Attachments: Plate I - Vicinity Map Plate 2 - Site Plan Plate 2A - Development Plan Plate 3 - Typical Footing Drain Appendix A - Boring Logs Geo Group Northwest, Inc. f N eW=Or C 000a Z� r TP-4 Ivor Tp-1 .7.7 0-or 0 m o u . -.41 Z-50 4r" A/C:. Z�. ........... CArr" > IL- M3826 W drar TP-3 TP-2 wor 4� wr N .pg N 8VP=O(:p LEGEND EXPLORATORY TEST PIT TP-1 (APPROXIMATE LOCATION) .0 0 40 SCALE: 1 inch 20 feet SITE PLAN Group Northwest, Inc. THE NICKOLSON OFFICE BUILDIN . G Gootechnical Eminsers. CieologW & 250 FOURTH AVENUE SOUTH Envirorunental Scientists EDMONDS, WASHINGTON SCALE: 1 2&. 1 DRAWN: KJ I CHECKED: WC DATE; 1/20/00 1 PROJECT; G- 1166 1 PLATE 2 F r M W 0 LEGEND EXPLORATORY TEST PIT 0 0 40 TP-1 (APPROXIMATE LOCATION) SCALE: I inch 20 feet DEVELOPMENT PLAN Group Northwest, Inc. — THE NICKOLSON OFFICE BUILDING GmftdvMW Emkmm. C'swoolft, & 250 FOURTH AVENUE SOUTH Emkornentw scwvuw EDMONDS, WASHINGTON SCALE: 1 20' DRAWN: KJ CHECXED: WC DATE: V20/00TPROJECT: G- 1166 1 PLATE 2A 0 . Relatively impermeable, compacted bacAfill Ge otextile fi Iterfabric (Mirqfi 140 NS, or equivalent) Free draining material (Washed crushed rock or drain rock) Minimum 4-inch diameter slotted or perforated PVCpioe with positive gradient to discharge Slope to drain S40 i.:7 CAPaLARYBREAK -X X X.: ................. X.: FOOTWO NOT TO SCALE NOTES: 1.) Do not replace rigid PVC pipe with flexible corrugated plastic Pipe. 2.) Perforated or slotted PVC pipe should be tight jointed and laid with perforations or slots down, with positive gradient to discharge. 3.) Do not connect roof downspout drains into the footing drain lines. 4.) Backfill should be compacted to 90% of maximum dry density based on Modified Proctor. The top 12 inches shall be compacted to 95% of maximum dry density if backfill is to support sidewalks, driveway, etc. � E Agmh6 TYPICAL FOOTING DRAIN . �Group Northwest, Inc. --E THE NICKOLSON OFFICE BUILDING r 1111111P Geotechalcal Rughmrs, Geologlets, & 250 FOURTH AVENUE SOUTH Envirown"td Sckndm EDMONDS, WASHINGTON SCALE NONE D ATE 1/20/00 MADE KJ CKKD WC JOBNo. G-1166 LATE 3 I - I 1 1 P I APPENDIX A G- 1166 BORING LOGS Geo Group Northwest, Inc. LEGEND,O&IL CLASSIFICATION AND PEARATIONT'EST UNIFIED SOIL CLASSIFICATION SYST M (USCS) MAJOR DIVISION GROUP t TYPICAL DESCRIPTION LABORATORY CLASSIFICATION CRITERIA I'SYMBOL I CLEAN GRAVELS GRAVELS (little or rho COARSE. (More Than Had GRAINED SOILS Comma Grains Larger Then No. 4 Slave) DIRTY GRAVELS t4ft some on") SANDS CLEAN SANDS Mon Than Hall by Weight Larger Than No. 2DO Sim Wore Than Hoff Coarse Grain* Smaller Than No. 4 Sieve) I 00a or no DRTY SANDS lfwIth Some anes) SiLTS Liquid Lima (Below A-Lina on Plas"Chart, Liquid LLTA FINE-GRAINED Negligible SOILS Organic) 3-50%. CLAYS Liquid Limit (Above A -Line on -930% Plas" Chalt. — Liquid Limit Negligible Organic) fift More Than Hal by Weight Larger Than No. 200 Sleve ORGANIC SILTS & CLAYS (Below A -Line on plut%Ck/ OMM Liquid Lima .50% Liquid Limit W 50% HIGHLY ORGANIC SOILS SOIL PARTICLE 822 U.& STANDARD SIEVE FRACTION Passing Retainei size sieve sieve (MM) SILT I CLAY 0.075 A6112 FINE W 0.425 4!)MM MEDIUM 010 zoo M COARSE $4 t7s #10 FINE 19 04 COARSE 78 COBBLES 70 mm to 203 nun BOULDERS x- 203 min ROCK 76 min FRAGMENTS ROCK �0.70 cubic meter In volume aw WELL GRADED GRAVELS, GRAVEL -SAND , Cu - (DW I D10) greater than 4 MIXTURF- LITTLE OR NO FINES DETERMINE PERCENTAGES OF Cc - (D30') I P10 - D09 between I and 3 OF POORLY GRADED GRAVELS. AND GRAVEL -SAW GRAVEL AND SAND NOT MEETING ABOVE REQUIREMENTS MIXTURES LITTLE OR NO FINES FROM GRAIN SIZE DISIRIBUTION CURVE ATTERBERG LIMRS �OW GM SILTY GRAVELS. QRAVEL41hND49LT MIXTURES W LINE CONTENT OF FINES EXCEEDS 12PA or P.I. LESS THAN 4 CLAYEY GRAVELS, GRAVEL-VWD-CLAY ATFERSERG LIMITS ABOVE GC MIXTURES COARSE GRAINED "A" LINE SOILS ARE CLASSIFIED AS or P.I. MORE THAN 7 - -- SW WELL GRADED SANDS, GRAVELLY SANDS FOLLOWS: Cu a peo 1010) greaw sm a LITTLE OR NO FINES -c 5% Fine Grained: Cc - (D301) 1 (010 * D11% betwoom I and 3 SIR POORLY GRADED SANDS, GRAVELLY SANDS. NOT MEETING A13OVE REOUIREMENTS LITTLE OR NO FINES OW. Gp. 6W. SP w 12% Fine Gmbmkt ATTERSERG; LIMITS �OW SM SILTY SANDS SMD43ILT MIXTURES "A"LINE GM. GICt SM, SC 5 10 12% Fine CONTENT OF FINES EXCEEDS M with P.I. LESS THAN 4 ATnMBERG LIMITS ABOVE SC CLAYEY SANDS, SAND -CLAY MIXTURES Grained: use dud 'A"LINE symbols with P.I. MORE THAN 7 Ml. MH I p1q ON �0 0.075 0.425 200 4.75 Is PMGANIC SILTS ROCK FLOUP, SANDY SILTS OF SLIGHT PLASTK31Y W 50 INIORGANIC SILTS, MICACEOUS OR DIATOMACEOUS. FINE SANDY OR SILTY SOIL 40 INORGANIC CLAYS OF LOW PLASTICITY. GRAVELLY SANDY OR SILTY CLAYS. CLEAN CLAYS 30 INORGANIC CLAYS OF HIGH PLAIFFICITY. FAT CLAYS 20 ORGANIC SILTS AND ORGANIC SILTY CLAYS OF LOW PLASTICITY 10- .r ORGANIC. CLAYS OF HIGH PLASTKXIY 4 0 oil IN RIMINI 151101 1 Am- - 1. 1 1. 0 10 20 30 40 50 00 70 81) 90 1W 110 PEAT AND OTHER HIGHLY ORGANIC SOILS UQUIDLW(%) GENERAL GUIDANCE OF SOL ENGINEERING PROPERTIES FROM STANDARD PENEMTION TEST (SPT) SANDY BOILS SILTY A CLAYEY SOILS slow Relative File" Blow Unconfined Counts Density Angle D-o"on counts Strength Description N % 4. degree N qU. bit 0-4 0-16 Very Loom -92 -c 0.25 very soa 4.10 16-35 25-30 I=" 2.4 0.25-0.50 Son 10-30 35-85 25-35 Medium Dense 4-8 0.50 - 1.00 Medlurn Sliff 30-50 65-85 35-42 Ow" 6-15 1.00-2.00 Still 3-50 85-100 38-40 VeryOw" 15-30 2.00-4.00 veryaw 2-30 3-4.00 Hard Group Northwest, Inc. Goo tee hnical Engineers, Goo I* gists, & Environmental 13240 NE 2ft l9beet, Sure 12 Bellevus.-WA 98(XG Phaft (4M ""757 I= (4115) 840,6758 PLATE Al TEST PIT NO. TP-3 LOGGED BY: KJ TEST PIT DATE: 1118/00 GROUND ELEV: 112 feet DEPTH tL USCS I SOIL DESCRIPTION SAMPLE No. Water % OTHER TESTS/ COMMENTS SILTY SAND, damp to moist, loose to medium dense, very fine Sm to medium grained sand, rootlets to 6" depth, very dark grayish brown (TOPSOIL). 19.9 -------------------------------------------------------- SM/ SILTY SAND and SILT, moist medium dense to dense, mostly 2 ML fine to medium grained sand, oxide staining, bedded, tan to gray (NATIVE SOIL). Light water seepage at 3 fect. m S2 20A 4 5 - -------------------------------------------------------- SM/ As above, grades to grayish SILTY SAND with light gray to tan ML -------------------------------------------------------- SILT Iona. 6 S3 19.0 SM SILTY SAND, medium dense to dense, moist fine to medium grained sand, some oxide staining, bedded, brownish gray. 7 ------------------------------ ----------------------- Sm SILTY SAND, dense, damp, fine grained, contains rounded gravel, massive, unsorted� occasional oxide staining, gray. 0 S4 13.4 Bottom of test pit: 8 feet. 9 Light groundwater seepage encountered at 3 feet. No caving from seepage zone observed. 10 Group Northwest, Inc. Geotechnical Engineers, Geologists, & Environmental Scientists TEST PIT LOG THE NICKOLSON OFFICE BUILDING 250 FOURTH AVENUE SOUTH EDMONDS, WASHINGTON JOB NO: G- I I WT-DATE: 1/19/00 PLATE A4 TEST PIT NO. TP-4 LOGGED BY: KJ TEST PIT DATE: 1/18/00 GROUND ELEV: 112 feet DEPTH ft. USCS SOIL DESCRIPTION. SAMPLE No. Water % OTHER TESTS/ COMMENTS SAND to SILTY SAND, damp, loose to medium dense, very fine - Sp- to medium grained sand, roots to 18" depth, very dark grayish SM brown ffljPSOIL).� a S1 23.9 -------------------------------------------------------- - SAND and SILTY SAND, damp to moist loose to medium Sp/ dense, very fine to medium grained sand, roots to 18" depth. — SM reddish to yellowish brown (NATIVE SOIL). S2 31.3 2 ------------------------------------------------------- SM SILTY SAND, moist to wet medium dense, contains 10-20% gravel, mostly fine to medium grained sand, some silt layers, 1I S3 24.2 gray. 3 Light water seepage at 2.5 to 3 feet; dense soil at 3 feet. 4 ----- ------------------------------------------------- ML SILT, damp, dense, contains little fine sand, trace gravel, weWy bedded, some sand lenses, brownish gray. 6 S4 31.4 6 -------------------------------------------------------- 7 Sm- SILTY SAND to SILT, very dense, damp, predominantly ML unsorted silty sand with gravel, gray. 0 S5 13.3 Bottom of test pit: 7.5 feeL Light groundwater seepage encountered at 2.5 to 3 feeL No 9 caving from seepage zone observed. '10 4M& Group Northwest, Inc.. Geotechnical Engineem, Geologlats, EnvironmentW Sclentlate . I TEST PIT LOG , THE NICKOLSON OFFICE BUILDING 250 FOURTH AVENUE SOUTH EDMONDS, WASHINGTON JOB NO: G-1 i�6 TDATE: 1/19/00 PLATE A5 I DISTRIBUTION G- 1166 Mr. Greg Mummy 3 Copies Gram Construction Services, Inc. 1506 Tenth Place North Edmonds, Washington 98020 Geo Group Northwest, Inc. I Copy Project File Geo Group Northwest, Inc. RECEIVED NOV 19 1999 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS DRAINAGE REPORT FORTHE NICKOLSON OFFICE BUILDING AT 260 4T" "E. S., EDMONDS WITHIN SEC. 23, TWN. 27 N., R. 3E., W.M. SNOHOMISH, COUNTY, WASHINGTON JRR # 99-36 PREPARED FOR: BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 (425) 771-8475 c"�t PREPARED BY: RONALD K. RIACH, P.E. d.b.a. JRR ENGINEERING 16030 52ND AVENUE WEST EDMONDS, WA 98026-4724 PN. (425) 787-6020 FAX (425) 742-6221 s 0 JD I ft a This report has been prepared by JRR Engineering for Bruce Nickolson, as support information for a Commercial Site development within the City of Edmonds. Any revisions to the proposed project may not use or depend upon this report without the written permission of JRR Engineering. City approval for the commercial site will require items which are generally as follows: I . Provide an off -site analysis 2. Identify existing conditions and possible development impacts 3. Show compliance with City code requirements for drainage Calculations and design plans are based on good engineering practice, City of Edmonds code requirements, methods and procedures in the Department of Ecology Stormwater Management Manual for the Puget Sound Basin (1992), and investigation of the existing system in the project area. General Site Description/Condition The subject property (site) consists of one lot totaling approximately 9750 SF (.22 acres) and is located on the West side of 4h Ave. S. approximately 250' North of Walnut Street. Said property has a street address of 250 4th Avenue South, Edmonds, and is within the SE quarter of the SE quarter of the SE quarter of section 23, township 27 North, range 3 East, W.M., Snohomish county, Washington. The site is bounded o ' n the South by a power substation, on the West by an alley with multifamily residential buildings beyond, on the North by a multifamily residential building and on the East by 4th Avenue South. Existing Drainame Existing drainage at and around this site consists of urban runoff. At this time there is no storm drainage system on the site to collect runoff. The existing building on the site utilizes splash blocks and no downstream drainage is currently impacted. No wetlands have been identified on or adjacent to the site. The Project is outside the floodplain and contains no shorelands. On the West and the South edge of property are catch basins that are the collection points for upstream runoff. These catch basin are connected through piping with varying diameters. Flow direction from catch basin to catch basin is determined with existing pipe invert elevations and catch basin rim elevations. Pipe diameter, rim elevation, invert. elevation, and flow direction information can be found on the General Site Plan. A merging point was found in a catch basin located West of the SW comer of the property. . � 15- 4b Proposed Drainaze It is anticipated that developed runoff from the site will continue to flow in the Westerly direction as in the present condition. An increase in impervious area is proposed, and runoff from the new commercial site, and the paved access and parking areas will be collected via catch basins and conveyed by a combination of PVC & corrugated high density polyethylene pipe (CPEP) to an oil/water separator which will contain an outlet control tee. The conveyance system will also act as the detention system. Development Impacts The parking configuration, landscaping and drainage improvements are proposed to provide access and parking for the proposed use and improve the collection of surface water runoff on the site. Runoff water quality will be improved by the installation of a baffle type oil/water separator. No significant erosion has been observed around the existing grading and no significant erosion is anticipated on the subject property or adjacent properties, due to the proposed development. Post development peak flows are expected to have no significant impact on existing downstream conditions as described in the following off -site Analysis & Downstream Conditions surnmary information. It is also anticipated that: (1) Modifications to the existing drainage system will not cause runoff to be diverted onto or away from the adjacent downstream property. (2) The proposed improvements are not expected to aggravate an existing drainage problem or create a new drainage problem on adjacent or downstream properties. (3) An oil/water separator with a two orifice control structure is proposed for treatment and for releasing runoff at pre -developed rates (see plan). (4) The proposed project conveyance system will contain and convey the 100-year design storm. (5) The Clearing Limits which are anticipated consist of and coincide with the property fines, which will be marked prior to construction to, indicate and delineate proposed improvements. Erosion/Sedimentation Control Desian Silt fencing, construction entrance and typical cover techniques will be employed to minimize the potential for erosion and sedimentation A complete erosion and sedimentation control plan will be provided in the construction drawing submittals. 4b. a Off Site Analysis The site is generally at the same grade as the abutting properties, and is generally not affected by 11upstream off -site areas". Storm runoff is limited to that which is generated "on -site". Downstream conditions consist of a storm drainage system. Nfinimal erosion has been observed around the existing grading. No significant erosion is anticipated on the subject property due to the proposed development. Post development peak flows are expected to have no significant impact on existing downstream conditions. Downstream Conditions Site Visit: June 9, 1999 Weather: Overcast and Dry Observer: Jason E. Schaefer Beginning near the Southwest comer of the site at 250 4th Avenue South: Observer noted an elevation drop of approximately 5 feet from the East to West Edge of property. Numerous catch basins are located at or near the edge of property on the South and West sides. A catch basin is located near the Southwest comer of the property which receives flows from an eight inch diameter pipe 67om the North and a six inch diameter pipe f7orn the East. Flows continue via an eight inch concrete pipe to the South approximately 30 feet to a type I catch basin, and from this CB through an 8-inch concrete pipe to the West, apparently traveling along a common property line between two multifamily residential buildings and discharging into a catch basin on the East side of 3rd Ave. S. which also collects street runoff from the East side of 3rd Ave. S. The elevation drop fi7om the West Edge of Said Property to this catch basin is approximately 5.5 feet. From this catch basin, a pipe continues in the westerly direction and tees into a storm drain fine running North to South in 3rd Ave. S. This drain pipe travels approximately 570 feet from said catch basin in the Southerly direction to Shelleberger Creek. Along this 570 foot length runoff is received from numerous catch basins and curb inlets and apparently discharges into Shelleberger Creek at its crossing under 3rd Avenue South where the creek is contained within a 24" diameter concrete pipe. On the West side of 3rd Ave. S. the Creek resumes an open channel flow traveling in the Westerly direction. 4b 17� Summary of Design Soils: Alderwood Series Hydrologic Group "C" Runoff Characteristics: Existing & Proposed Cn: 85 Meadow 98 Impervious surfaces Design Storms: 2 Year Design storm precipitation = 1. 5 inches 6 Month Design storm precipitation 1.5(.64) =.96 inches (Not Used) 10 Year Design storm precipitation 2 inches 100 Year Design storm precipitation = 3 inches Pre -Development Condition: Site Area = 9750 SF (.22 ac.) Landscape area = 9750 SF (.22ac.) Impervious Area = 0 SF (0 ac.) 2 Year design storm peak runoff = . 0 1 10 Year design storm peak runoff = .03 100 Year design storm peak runoff = .07 Post -Development Condition: Site Area = 9750 SF (.22 ac.) Landscape area = 2750 SF (.063ac.) Impervious Area = 7000 SF (. 161 ac.) 2 Year design storm peak runoff = .08 10 Year design storm peak runoff = . I I 100 Year design storm peak runoff 18 Detention Required: 466 W Detention Provided: 466 W 41 0 f /-5- 0 Prbited fbom TOPOI 0 1997 4b Pmdwtiozw (www.topo-com) VIC-I�A(Tle MAP . 5� 4- 6 0 zi z L%- cil cla 6 pa cn r%4 0 z 0 9 P4 0 JRR ENGINEERING 16030 52nd Avenue West Edmonds, WA. 98026-4724 (425) 787-6020 Fax: (425) 742-5221 job n design RKR drawn ES OPP I V 'd, RKR dwg. NICKOLSONIGSP THE NICKOLSON OFFICE BUILDING BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 DATE: 6/18/99 60 0� Ig hel MA HlflOS HfINaAV Hlt - Pitml ka aWYM 38 OL 3SrM 9MISM 4 oftl cQ Id" a to cQ I It is C3 .0 z 0 0 JRR ENGIUEERIN job no- 99-36 THE NICKOLSON OFFICE BUILDING 16030 52nd Avenue West design RKR BRUCE NICKOLSON Edmonds, WA. 98026-4724 9829 CHERRY ST. (425) 787-6020 drawn Fax: (425) 742-5221 Opp RVIde RKR EDMONDS, WA 98020 dwg. NlQK0=NZjE$.Q.- , DATE: 6/18/99 7 5� ENqiNEER!Nq & PtANNiNq SERViCES 16030 S2nd Avenue West 9 Edmonds, WA 98026-4724 (425) 7454766 e Fax (425) 742-SZM ProJect Name- 4ji-c-Icc, n I ICIMO No.: 11-23G 44 0 ac6awi ',aec.,o, f SVIL 0" lb �O 044,4, MAP 105-6 1 ^CI. -CA 4's ser;ex) 6*4k, ?57 57SO ?r Z -05F 7S Iq 7000SF (.)(.1 r eL4"%;I kes Ar- lo too Y'r 07: e.k i�* 4 fj=@24 ANEAd"'J", *all peAw W4 t, it 37 129 711= /.I 4 94? 0 �, 0 35 Sheet 0 of 0 0 - SHEET NUMBER 56 Z: CuuLm"l-Y FZ MILES 1 4- Is I I kidLLIUbi MiNJAV kiLh7 I :i z r— CQ i Vi 02 0 z 0 9 0 136@ .4 JRR ENGINEERIN THE NICKOLSON OFFICE BUILDING 16030 52nd Avenue West Job no..-- 29—A BRUCE NICKOLSON Edmonds, WA. 98026-4724 de*ii MR 9829 CHERRY ST. (425) 787-6020 ch a WR----Az— Fax: (425) 742-5221 awyds RKR EDMONDS, WA 98020 #09- 'WOLIM"EW DATE: 6/18/99 10 0� IS 0 SPECIFY STORM OPTION: 1 S.C.S. TYPE-lA RAINFALL DISTRIBUTION ENTER: FREQ(YEAR), DURATION(HOUR), PRECIP(INCHES) 2,24,1.5 ---------------------------------------------------------------------- S.C.S. TYPE-lA DISTRIBUTION 2-YEAR 24-HOUR STORM **** 1.50" TOTAL PRECIP. ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .22,85,0,98,19.25 2- F_ &li"Z, DATA PRINT-OUT: AREMACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .2 85.0 .0. 98.0 19.3 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .01 7.83 359 ENTER [d:1[pathlfilename[.ext1 FOR STORAGE OF COMPUTED HYDROGRAPH: nic2pr - - - - - - - - - - - - - ------- - - - - - - - - - - - - - - - ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .063,86,.161,98,1.1 DATA PRINT-OUT: AREMACRES) .2 PEAK-Q(CFS) .08 PERVIOUS A CN .1 86.0 T-PEAK(ERS) 7.67 '2. %-? F, A R, IMPERVIOUS A CN .2 98.0 VOL (CU- FT) 861 TC (MIN S) 1.1 ENTER [d:1[pathlfilename[.extj FOR STORAGE OF COMPUTED HYDROGRAPH: nic2po SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP It Of- )S- 31C.S. TYPE-lA RAINFALL DISOBUTION ENTER: FREWYEAR.), DURATION(HOUR), PREC . IP(INCHES) 10,24,2.00 ----------------------------------------- S.C.S. TYPE-lA DISTRIBUTION 10-YEAR 24-HOUR STORM **** 2.00" TOTAL PRECIP. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .22,85,0,98,19.25 DATA PRINT-OUT: AREA(ACRES) .2 PEAK-Q(CFS) .03 PERVIOUS A CN .2 85.0 T-PEAK(HRS) 7.83 IMPERVIOUS A CN .0 98.0 VOL (CU`- FT) 633 I (D 1� 9 4 1;�_ TC(MINUTES) 19.3 ENTER [d:][pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: niclOpr SPECIFY STORM OPTION: 1 S.C.S. TYPE-lA RAINFALL DISTRIBUTION ENTER: FREQ(YEAR.), DURATION(HOUR), PRECIP(INCHES) 100,24,3.00 ---------------------------------------------------------------------- ------------------------------- -- - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - ENTER: A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .063,86,.161,98,1.1 .063,86,.161,98,1.1 DATA PRINT-OUT: 10 \�EAP, AREA(ACRES) PERVIOUS IMPERVIOUS A CN TC(MINUTES) A CN .2 .1 86.0 .2 98.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU`_FT) .11 7.67 1231 ENTER [d:][pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: niclOpo SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP n STORM OPTIONS: 1 - S.C.S. TYPE-lA 2 - 7-DAY DESIGN STORM 3 - STORM DATA FILE SPECIFY STORM OPTION: 1.50 0 0 S.C.S. TYPE-lA DISTRIBUTION 100-YFJ�R 24-HOUR STORM **** 3.00" TOTAL PRECIP. ---------------------------------------------------------------------- ENTER: A(PERV), CN(PERV)l A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 1 .22,85,0,98,19.25 I DATA PRINT-OUT: E X, AREMACRES) PERVIOUS IMPERVIOUS A CN A CN .2 .2 85.0 .0 98.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU`-FT) .07 7.83 1263 iw YEA R TC(MINUTES) 19.3 ENTER [d:][pathlfilename[.ext] FOR STORAGE OF COMPUTED HYDROGRAPH: nic100pr w1ow -------------------------- I- . - - .. __ I - - - - - �. _; - - - - ' '-m_ - _: --------- : A(PERV), CN(PERV), A(IMPERV), CN(IMPERV), TC FOR BASIN NO. 2 .,063,86,.161,98,1.1 DATA PRINT-OUT: yrA-k, AREMACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A Cm A CN .2 .1 86.0 .2 98.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-PT) .18 7.67 1998 ENTER [d:1[path]filename(-eXt1 FOR STORAGE OF COMPUTED HYDROGRAPH: nicloopo SPECIFY: C - CONTINUE, N - NEWSTORM, P - PRINT, S - STOP 13 dr- 15; SUMMARY OF INPUT ITEMS 1) TYPE OF FACILITY: TANK 2) TANK DIAMETER(ft), STORAGE DEPTH(ft): 3.00, 3.00 3).VERTICAL PERMEABILITY(min/in): .00 4) PRIMARY DESIGN HYDROGRAPH FILENAME: niclOOpO 5) PRIMARY RELEASE RATE(cfs): .07 6) NUMBER OF TEST HYDROGRAPHS: 2 HYD, 1 FILENAME: nic2po TARGET RELEASE(Cfs): .01 TEST TEST HYD 2 FILENAME: niclOpo TARGET RELEASE(Cfs): .03 7) NUMBER -OF -ORIFICES, RISER-HEAD(ft), RISER-DIAM(in): 2, 3.00, 8 8) ITERATION DISPLAY: NO ENTER ITEM NUMBER TO BE REVISED (ENTER ZERO IF No REVISIONS ARE REQUIRED): -------- --- /y otl� BOTTOM ORIFICE: ENTER Q-MAX(CfS) .012 .625 DIA.= .64 INCHES TOP ORIFICE: ENTER HEIGHT(ft) 1.65 DIA.= 1.96 INCHES 1.2's PERFORMANCE: INFLOW TARGET -OUTFLOW DESIGN HYD: .18 .07 TEST HYD 1: .08 .01 TEST HYD 2: .11 .03 SPECIFY: D - DOCUMENT, R - REVISE, ROUTING DATA: ACTUAL -OUTFLOW .07 .01 .03 A ADJUST ORIF, PK-STAGE STORAGE R. 99 310 4-&6q,30 am -ae.&190 1.88 9-&e2m E - ENLARGE, S - STOP STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) pERM-AREA(SQ-FT) .00 .00 .00 .0 24.3 .0 .0 .30 .60 .01 66.5 .0 .90 1.20 .01 .01 117.9 174 .6 ..0 .0 1.50 .01 * 233.7 1.65 .01 263.4 .0 1.8,0 .03 292.8 .0 2.10 .04 349.4 .0 2.40 2.70 .05 .06 400.8 443.0 .0 .0 A7 3.00 .07 467.4 .0 3.10 .28 467.4 .0 3.20 .66 467.4 .0 3.30 1.00 467.4 .0 3.40 1.14 467.4 .0 3.50 1.27 467.4 .0 AVERAGE VERTICAL PERMEABILITY: .0,MINUTES/INCH SPECIFY: F FILE, N - NEWJOB, p PRINT IF/OF, R - REVISE, S STOP LA :5 �or tv 3 pro tu /� X 3, r, 4-0 1, V 2- ( ;7q F) ok > q, pw_ a 0 0 0 0 0 0 0 0 0 . 0 0 0 0 a . 0 0 0 0 0 0 0 0 0.0. . 0 0 . ..0 0 0 a 010 0 0 0 0 0 0 0 0 1 0 0 0 . 0 0 . 0 a o May 26,,1999 1 Mr. Gordon Hyde. Development Service Engineer City of Edmonds 121 5t'Ave. K Edmonds, WA 98020 _1 <7 SIR, ME Subject: Proposed Nickolson Office Building 2504 th Ave. S., Edmonds, WA Dear Gordy:, Butterfield Design Group 400 Dayton Edmonds, Washington 98020 Tel: 425.775.0564 Fax: 425.776.5746 Attached is a proposed parking plan dated 5-25-99 for the above project, showing4he following: - One way entra ' nce and exit at parking. - A 12 foot wide entrance drive from 4 Avenue and a 16 foot wide exit drive to the alley. th A 14%'driveway ramp from 4 Avenue to the building parking'garage. If this plan is acceptable to. you, please, indicate in the space below and return to me. If you have any questions, please don't hesitate to contact me. We must apply for a building permit by June 25, 1999, -prior to the conditional �use permit expiration for this project, soyour prompt attention is appreciated. Sincerely, Bradle Butterfield BUTTERFIELD DESI fNGRCUP I concur with the proposed attached plan. Gordon C. Hyde .11) C. 10 , CITY t EDMONDS is 121 SDI AVENUE NoATH - EDMONDS. WA 98020 - (425) 771,022(). FAX (425) 171-0221 C)EVFLOPMF-NT SERVICES DErARTMENT planfillig - BuildI118 - [ngillecring Monday, May 10, 1999 Brad Butterficid Buttctfield Dcsign GIOUP 400 Dayton St. Edinonds, WA 98020 Dear Brad: BARBARA FAHEY MAYOR ,,e permit expires and Tilis letter is ill leply to your qucsti011., of wlIcn your cuff ent Condifional Ur if you may apply for another extension. I talked with the plall,ling Supervisor, Jeff Wilson. tional Use Petullt ((:(jP) for your project on 4d' Avc. S. and j1pplication for a about the expiration of the Condl ,eviewing the code and previous decisions, we reached tile conclusion that building pellnit is tile only thing that will vest tile CUP ill your situatioti. The decisions issued on this Conditional Use Pcnnit also limit it to one extcnsion. This all adds up to tile expiration of (11c appioved CUP on July 2 of this year. 1, In soff y I don't havc any better news. Fccifrectocotitactiiiewitilaiiyquestiolisy0umigilt have on t1lis issue. . I# cc: Strect file for 316 Main 51, Giaf, Jeannine a InrornorciedAuClust 11. 1890 9 TUIAL P.13-2 0 0 0 0 0 0 0 0 0 0 9 0 0 0 0. 0 . . . . . 0 0 0 0 . . . . . . . .. M'y� 25 1999 a Butterfield Design Gioup 400 Dayton Edmonds, Washington 98020 TA 425.175.0564 'Graf Fax: 425.716.S746 'Jeannine City of Edmonds 'Community Services Dept. Building Division 1h 121 5 Ave. N. Edmonds, WA .'98020 th Reference:' Nickolson Office Building/4 Ave. South Dear Jeannine, % documents for theabove referenced project, Regarding submittal of construction enclosing a letter. frorn'Steve per our conversation with Lara Knaak, we are Bullock'which states that application for a building permit.is the, only th.ing that will. vest the Conditional Use Permit., It is our understanding that the City has agreed to. allow us to submit the geotechni Is il test after removal of the building currently occupying the. ca o 1y. proper If there are any further questions or clarifications, pl�ase contact our office immediately.so we can resolve any issues that would'imppct. the.J,uly 2,, i 99.91. expiration of -the Cbnditional Use Permit for this project. Sincerely, Bradley J. Butterfield BUTTERFIELD DESIGN GROUP Cc: Ray Miller Bruce Nickolson mum 1=1111111 ri CITY OF EDMONDS COMMERCIAL TENANT IMPROVEMENT/ REMODEL COVER SHEET Directions* Applicants are to complete the Information In the WHITE BOXES ONLY (Shaded boxes are for City use only). This cover sheet must accompany each building permit application for a commercial tenant Improvementiremodel project. PLAN CHECK # APPLI , CANT' DATE RECEIVED PROJECT ADDRESS QL,0 (-1 '!!' /4'VJZ, UNIT # PROPERTY TAX ACCOUNT PARCEL If ;13- a 7 k/ 3 DESCRIPTION OF WORK / / 4=a OWNER J JAe�� PHONE 7L) CONTACT PERSON �r-ONA/ P H 0 N E Z&,C- -34-49' FAX Zjd:� C- �3& 4 -7 o, 1 -7 E-MAIL MAILING ADDRESS R7-10 dr e-4- t%J %-A & E7 L rZ _-a FAX CORRECTIONS MAIL CORRECTIONS E-MAIL CORRECTIONS 6 Y SIGNING THIS STATEMENT I UNDERSTAND THAT I AM THE CONTACT PERSON FOR THIS PROJECT. IT IS MY RESPONSIBILITY TO COORDINATE ALL SUBMITTALS WITH THE CITY AND ONLY I CAN MAKE INQUIRIES ON THE STATUS OF THE APPLICATION. I UNDERSTAND IT IS MY RESPONSIBILITY TO DETERMINE IN ADVANCE OF PERMIT SUBMITTAL ANY DISCRETIONARY PERMITS THAT MA Y BE APPI. AS 0 MS PROJECT. I ACKNOWLEDGE THAT TO THE EST OF MY ABILITY I HAVE SUBMITTED ALL NECESSARY UMENTAT�C .N'�tT FID DOC =M)nPLETE APPLICATION AND NO DISCRETIONARY APPROVALS ARE REQUIRED. SIGNATURE DATE CODE, EDITIONS 1997 UBC, UMC, UPC, WSEC, VIAO WITH AMENDMENTSJInclucling State Barrier Free Code) TYPE OF CONSTRUCTION OCCUPANCIES NUMBER OF STORIES I- BASEMENTS NUMBER OF EMPLOYEES_ TOTAL PARKING SPACES DEDICATED TO TENANT BARRIER- FREE PARKING SPACES EXISTING PROPOSED STRUCTURAL CALCS PROVIDED LIGHTING BUDGET PROVIDED EXIST ING AUTOMATIC SPRINKLER SYSTEM MANUAL AUTO NONE EXISTING FIRE ALARM SYSTEM 1:1 YES NO DISCRETIONARY APPROVALS. ADB CU OTHER FIRE PROTECTION INFORMATION (City Use Only) ALTERATIONS TO EXISTING SPRINKLER SYSTEM ALTERATIONS TO EXISTING FIRE ALARM SYSTEM FIRE EXTINGUISHER TYPEIRATING QUANTITY (See plans for locations) STAFF COMMENTS PLUMBING FIXTURES - WAC Table 29-A (City Use Only) SQ,FT, : �WATER CLOSETS LAVATORIES —Stina -Proposed Existing Proposed At E E It - E K. '-.E BARRIER FREE RESTROOMS EXISTING_ STAFF COMMENTS I . PROP 0 BE D PARKING INFORMATION (City Use Only) USE SO�FT. FACTOR SPACES R E QUIRED TOTAL SPACES REQUIRED TOTAL SPACES PROVIDED BARRIER FREESPACES REQUIRED BARRIER FREE SPACES PROVIDED STAFF COMMENTS SEPARATE PERMITS (City Use Only) MECHANICAL/HVAC FIRE SPRINKLER El PLUMBING GREASETRAP El Any request for modification, variance or other administrative deviation (herinatter "variance " I must be, specifically called out and Identified. Approval of any plat or plan containing provisions which do not comply with the city code and for which a variance has not been specifically identified, requested and considered by the appropriate city offical In accordance with the :ro riate provision of city code or ptateplaw does not approve any Items not to code specification. VIAO CODE COMPLIANCE INFORMATION (Table 3-4) OCC.LOAD/ C-M TOTAL SO,FT FACTOR ffm STAFF COMMENTS OCCUPANT LOAD CALCULATIONS (City Use Only) AREA FACTOR OCC. LOA D TOTAL OCCUPANT LOAD STAFF COMMENTS* PERMIT ISSUANCE APPROVALS (City Use Only) PLANNING REVIEW & APPROVAL :L2 1 �:2 DAT CONDITIONS OF APPROVAL: FIRE REVIEW & APPROVAL DATE CONDITIONS OF APPROVAL: BUILDING REVIEW & APPROVAL CONDITIONS OF APPROVAL: DATE w— L:\temp\building\forms�Tl-rvw.vsd -- 7/00 CITY OF EDMONDS PUBLIC WORKS DIVISION 9 n 1 SIDE VV4k,/HAZARDlqUS CONDITION REPORT ................... %jvvf4vlm. M_f :$ v u it, I I t. , I I I 1 11 1 1 1 - , ADDRESS -250 4th Ave".1k.8. - - I/ . . 4_0 NAME OF REPORTING PERSON 0105 HORIZONTAL CRACKS 1" No VERTICAL MISALIGNMENT 11)2"_LeS LOCATION OF HAZARD: I COST OF REPAIRS: $121.50 PROPERTY OWNER'S SIGNATURE FOR REPAIR: I NAME OF PERSON(S) I WITNESS VED DATE OF INSPECTIOM TIME REPORT RECEIVED tEA TO BE SAWCUT WIDTH 5 - 5 LENGTH 15 TOTAL L.F. TOTAL SIDEWAIX WIDTH 5 - 5 - 5 LENGTH— 2 - 2 - 2 -TOTAL SO. FT. TOTAL SQUARE FEET 90 AGE ADDRESS PHONE AGE ADDRESS PHONE - - RESULTS OF ON -SITE INSPECTION COST OF REPAIRS V, 1,40 - 01- PHOTO REQURIED YES NO INFORMATION ROUTED TO STREET SECTION COMPLETED BY DEPT. PHONE TO BE COMPLETED BY RESPONDING DEPARTMENT HEAD DATE WHAT CORRECTIVE MEASSURES WERE TAKEN OR ASSISTANCE GIVEN? (IF NONE PLEASE EXPLAIN) I I— — — — __ __ - I 1-4 WALK, Eg k�:7 [9 0 T Ug - ,-" . - - - a. U)l STREET SUPERVISOR �e" j (4// DATE FINAL REVIEW (TO BE COMPLETED BY P.W. SUPERINTENDENT) DAI I[' IL-CEIVED P.W. SUPERINTENDENT DATE COMPLETED FORM TO BE FILED IN ADDRESS FILE (WHrM—RESIDENT COPY) (CM&AW—STRELrr ADDRESS FUM COPY) (PINK—STRELrr CREW COPY) (GOLDENROD—PUB11C WORK COPY) PLANNING DATA -- Sign5 -- Name: Date: Site Address: Plan Check #: BLD-200 - Project Description: Reduced Site Plan Provided: F�S)/ NO) Zoning: Comprehensive Plan Designation: PA-) —[Comer Map Page: J Lot: (YES t Fla Lot: (YES/ ADB File # (or date waived): TOTAL Area per Typw of Type of Sign Allowed in zone? Matrix conditions met? Allowed area per unit Unit TOTAL sign area allowed for this sign Proposed sign area ExRMPle Wall wlInternal AluminatIbn Yes with condItions Yes I sq. It.11ineal /t. attached Wd// 41 It attached W1311 41 square feet 20 square feet Sign # 1 Sign #2 Sign #3 TOTAL Sign Area for TenantlSi4p- Max Permitted: 57� Previous Total: JX 47� (40 Proposed Total: D-4 Sign Height Sign Type: Max Permitted: Actual Height: Sign Type: Max Permitted: Actual Height: Sign Type: Max Permitted: Actual Height: 5ign Ligh6nq Sign Typ e: Proposed: VV Allowed in Zone: Sign Type: Proposed: V Allowed in Zone: PLANNING DATA 5igns -- Colors Proposed: %j 'It- --,e Acceptable? Requirejs ADB Approval? V\_ L) *01OCaMOf 7 If freestanding and 3-feet or over (unless a fence) meets setbacks? �Reqgined ett eks &a Street: Side: Side: Street: Side: Rear: L4 Ay �Free��Adi Signs Size: Location: Critical Areas Determination Study Required Waiver Otheir r% La-� YN- �CUYL�Scar_� Plan Review By: City of Edmonds Building Department PLAN Jeu MAI G 01 V APPR E GIN I Date: 4'-4" 4'-0" F 3'-8" :24 Nfl. NOTICE REQ. !FOR INSPECTION SITE PLANIJOBSITE VICINITY MAP Scale:l"=50' DECORATIVE TRIM BOX .063"ALUMINUM 2" 1/2" BOLTS TOP & BOTTOM PVC/BRUSHED ALUMINUM LETTERS 1/2"STANDOFF MOUNT, 1/2"THICK 31-0- 2'-0" 1.5"x 1.5" x.125"ALUMINUM TUBE FRAME (WELDED) 1.5" x 3" x.250" STEEL TUBE THROUGH SIGN .090"ALUMINUM SIGN FACE -4— DECORATIVE TRIM BOXES 2- .063"ALUMINUM T 6" I �J PVC/BRUSHED ALUMINUM LETTERS GRADE C 4�/ OWNER/CON'TkAuTOR IS RESPONSIBLE Z� FOR EROSION CONTROL AND DRAINACE 2' C <=> Z� zn 0 r Applicant shall repair/replace all damage ti �\ c � utilities or frontage Improvements in City rictht-of-way ner Cltv standards that is cau-c 0 ',-A or occur, during the permitted project. C) SIGN DETAIUEAST ELEVATION Scale: 1.5"= 1'-0" Y-0"H x 4 -O"W REPLA NT SIGN I/.' SURFACE MOUNT, 1/4' THICK CONCRETE BASE 5 SACK MIX S"'O"PIREET FILE RECEIVED A Hr. I I I A I J 4UII C> BUILDING DEPARTMENT CITY OF EDMONDS SIGN DETAIUSOUTH ELEVATION Scale: 1.5" = V-0" Customer Name: CG Engineering Project Address: 250 4th Ave S, Edmonds WA 98020 IISN&AWNING Date: 8/13/11 Design #:kylene/CG Eng neerng Approved by.- Date: :7D Approved by., - I n-tp. 0 4� In 0 L11k 01 0 01 1 4. 14 wt CITY OF 8bm- ONDS,;I, BUILDING DE RP, E NT_;,,� Ail WORK ct> ADDRESS 7- OWNER r APPROVED DATE: 13LDG. OFFICIAL PERMUT N MBER �At STREET FILE T I I A, RECEIVED AUG 2 3 2011 dUILDING DEPARTMENT t k aTy OF EDMONDS No PERMIT-sToP WORK -REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMYLY WITH ALL APPLICABLE CITY CODES. [__j CONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND PERMIT - STOP WORK. MAKE WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE. STOP WORK - UNTIL AUTHORIZED To CONTINUE BY CITY INSPECTOR. CORRECTIONS LISTED BELOW MUST BE MADE: BEFORE WORK CAN BE APPROVED AND/Oft THE NEXT PHASE IS STARTED; To AVOID POSTING OF A STOP WORK ORDER, ORDER To CORRECT, OR ABATEMENT PROCESS. F—A JOB CARD MUST BE POSTED ON SITE AND BE VISIBLE FROM STREET. F-1 APPROVED PLANS MUST BE AVAILABLE To INSPECTOR ON SITE. F-1 WORK DESCRIBED BELOW HAS BEEN INSPECTED AND Is APPROVED. F-A CONTACT INSPECTOR AND ARRANGE FOR APPOINTMENT. FA RECALL FOR INSPECTION. 41'ni 'q_/ 11r1J_J_1) )A] 1./JJZJ9 Af 1_5' OF ,[;,-Y) 7- 1� I _ t4t �OftbM cu" pri mi ,-�kiAl� 00 V49) eVACC 412-- 5 1 kfifi OWOg' F>kv<-::- 6 1 'r OVE ARE REQUIRED WITHIN 7 JWE;ACTIO-NS'OR CORRECTI NS INDIA I r- wo 6A A,DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTIONS CALL 771-0220. LjBuilding Division 0 Planning Department LoEngineering Department FIFire Department CITY OF EDMONDS 'T M'(0 Inspector �&b ( Date _=11b EXIbl. �)�) �,-U-' STA. 5 + 21.9 RIM EL. 110.23 S IE 103.63 BEGIN ALLEY GUTTER, MATCH EXISTING GRADE.-----\ INSTALL 44 LF OF ALLEY GUTrER, SEE DETAIL ON THIS SHEET. DIRECT RUNOFF TO EXIST. CB TRASH ENCLOSURE — EXIST. CB (TYPE 1) RIM EL. 109.76- RAISE TO 110-09 SW IE 108.26, 6" CP N IE 108. 26, 6" SP NW IE 108.56, 6" SP RAISE FRAME & GRATE INSTALL (1) 4- RISER SECT. EXIST. CB (TYPE 1) RIM EL. 109.68 SE IE 108.48 0 ull BENCH MARK 0 PIK NAIL IN ACP E—LE;7A—TION = 110.06 I STA 3+35.0. IE 102-3± 10. 19 INSTALL 6" TAP ON SEWER MAIN PER CII Y OF ED!vION�7D�z- Ty PICAL SID" EXIST. CB (TYPE 1) RIM EL. 109.12 NE IE 107.72, 6" CP S IE 106.90, 8: CP W IE 106.90, 8 CMP 001 .:-XIST. CB (TYPE 1) - RIM EL. 109.91 N IE 106.81 8" CP S IE 106.81 8" CP E IE 106.91, 6" CP S=. 9--; - Se L: �!Tlwmlr 147;jll.w BASOM FRAMES. GRAT, SHALL CowpLy W" C STANDARDS. CATCH BASIN 11 (TYPI RIM EL 110-50 W IE 106.99, 8" CPEF E IE 106.99. 8- CPEP CATCH BASIN J2 (TYPI RIM EL 110-44 S IE 107.22, 24" CIVIF E IE 107.22, 24m CMF 10 130.00' 'L N 89*52'01" E Lrl D J'CONCRETE URB AIL SHT. CT I 8.50 0 cy) MID 5% m ! t)=.uuo wl CB# cl-4 Do V- I RK PIPES 9 -oj crs � c b r- ;, owi tq olm HAvE L�F-S� 7-HAIg 0 F I- Fr eoQF 3"0 7 SLAB FF EL.) 112.1 LOBE FF E 11 A, 4 0 GA'l E ------- 81.1 2.0'0 LANDING 19 CmP PE, SDR 7 \—LANDINd� .001 "� * BE V'b 4 A OIL/WATER 'X6 SD - SEPARATOR, SEE SHT C-3 CO N F I Pu4S-t� 1� 4� MI6 FlEf-b 00-sE-RtlA'T%0m'-'5 SSW-i (TtX'STING) S ; 4. 3 5 Zl� ;Zo.oc) 2' - 0, " EXIST. CB (TYPE 1) RIM EL. 112.37 FT W IE 108.37 JOINT 15"0 DI FOR PL 1> I -,e_- " o ce, 1p 0.05 Fr./FT. 0.05 FT -/FT' 31 "I ", q 116 GHT M MAX Nb 1\10 R ,A _L 2" ME�E SEMBLY- SEE SHEET C-5 PE 1) m FT 9.8 ti /12 Pr)w) - 116.98 REMAIN SIDEWALK sok—,-, i " = 10, RE[)UCA_R ,�X I C,OL.Jjjt�-LING & GAT11-1 VALVE 8 L 3/4" T"(PE K, C04,', ER FROM EXIS�J,-ING METER 64 EXISTING 5/8X3/4 WATER METER TO R MAIN PE MET R AS LANDSCA INSTALL NEW DRIVEWAY. 14' WIDE THROAT CENTERED ON FRJNTAGE OF PROPERTY. SEE! DETAIL — 6. F )w ON SHEET C LINE EL. APPROX. 117.7 42 .4 q 4>� roo 7t -CONCRETE CURB & GU-qER W 'SEE SHT. C-4 FOR .,COMPLETE SE ER & WATER! -TALL 2 "D" lNFORMATiON �_FDDLE C"" )P. SEE DE EET C­5 tBENCH MARK ELEVATION = 118.17 FT. PK NAIL IN ACP —MATCH EXISTING GRAD EL. 118.10 \—WATER METER 9.8** ........ . ..... Ji U u u ul 39.37' ACO DRAIN 100 2 EL. 1' REMOVABLE WATEf COUPLING OR FU Ell NO' OVERFLC PROVID' AND OIL ELEV. = Bc 3 INN RESTRIC SHARP SHOP I BUTTERFIELD DESIGN GROUP TRANSMITTAL lz,fy) r Iva Gompany Date: N Project: message: - - ShA O'K" Ile q1 I 4/Wq P 1:00 1% it 4QA v 0 W. kt W& rf �n a .. I I- I FROM: ATTAGHMENTS: GC: , I � 98020 Telephone: 425/776-0564. Fax:425.776-5746 C, Edmonds. WA 400 Dayton Streo W "A dMM� sow_, RA gj; Will Lt amw 1111i. Allis At* A 2 FCA 12 rogr: �g 4 0 �ov.! X�, City of Edmond's Permit No: 2- RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: A. Address or Vicinity of Construction:,�: 250, 4 vkl� B. T e of Work (be specific): PERMISSION IS REQUESTED TO INSTALL 250' 2" MPE IP GAS MAIN 021'x cP1 4 AV S FROM 259's c/1 DAYTON ST TO 259's c/1 DAYTON ST TO SERVE 250 4 AV S. 16_7 01 00 G 11 C. Contractor:_1EG Mailing Addres State License #: 1122 75th ST D. Building Permit # (if applicable Contact: DOUG USITALO 452-5656-7520 Phone: Liability Insurance:— Bond: $ 'Side Sewer Permit # (if applicable): E. Commercial Subdivision E] City Project 0 EUC (PUD, GTE, PSE, CHAMBERS, OVWD) Multi -Family Single Family F] Other INSPECTOR-- F. PAVEMENT: [N YES F-1 NO G. SIZE OF CUT 2 X 4 H. Charge: $ CONCRETE CUT: E] YES F� NO IDEMNITY. Applicant understands- by hislher signature t� th]is dppliedtioni-helshe holds the City of Edmonds harmlessfrom. injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. * Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday — NO EXCEPTIONS. * Three sets of construction drawings of proposed work are required with the permit application. I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENE-V AND A CKNO WLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS / d A/boo 0 (Contractor or Agent) CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK Approved by: Time Authorized: Void After -1'2- Special Conditions; -V?-ff?MC_ CCAJ-12-OL- pmn�etl� pe!A� 14,C).O. W-eq— CA-Tu E ONLY Right-of-way Fee:_q'_�O + SO Disruption Fee/Fund 111: Restoration Fee: Total Fee: :::::J!5V4W Receipt No: Issued bZ-.0]7_ UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE. FINAL APPROVAL OF PERMITTED WORK:- JNSfiE�TOR'S SIGNATURE DATE: For inspection requirements see Engineering Information Handout. I NO WORK SUIAIA, BEGIN PRIOR TO PERMITISSUANCE k 11 0 MEMORANDUM Date: October 25, 2000 To: PSE From' Pamela Lemcke Engineering Special0SF____ Subject: Right of Way Permit Traffic Control Conditions of Approval Traffic Control in the City Right-of-W All signs, barricades and related equipment and their use must be in accordance with Part IV, -"Traffic Controls for Highway Construction and Maintenance Operations," of the Manual on Uniform Traffic Control Devices, as prepared by the National Joint Committee on Uniform Traffic Control Devices and per the City of Edmonds Developmental Standards. Reasonable accommodations shall be made for distance. requirements in signage for geometrical conflicts. Coordination with the City Inspector prior to all work for traffic control inspection. Particular attention should be made to the following items: There shall be at all times reasonable pedestrian and vehicular access to and egress from the properties adjacent to the project, so far as possible. Contact the affected homeowners/business owners directly to prevent conflicts. The Public Safety Department (police and fire), 771-02.00 and 771-0215, Edmonds Public Works Department 771-0235, and the Edmonds School District Transt)ortation Department, 24-hours prior to construction. Proper provisions shall be made for public convenience, safety and travel. Any asphalt concrete pavements, crushed surfacing, gravel base or water required for maintaining traffic during the life of the project shall be placed by the contractor immediately upon request by the engineer and/or inspector. All unattended excavations shall be properly barricaded so as to prevent accidents. Construction along or across the City right-of-way shall be as per the contract documents, City of Edmonds Standards, or as directed by the engineer and/or inspector. City of Edmonds NOTES ke i 1f, j "I'l, I SCALE S1 N 7) SI Pi S1 Q) .OLJ 4-) 0 a. I 60' DAYTON ST. T'­STW I P 21 'N (CP) S T W T-P - T_7 EX 2 1 N 7C 0 J-2 1960 7 6 3: to t�& 11/ 4" STUB ILI30' 30 C.) V) Cr L-Li <1 A 206'Sl u A 1 2 0 7 S I 30'W— ............ --- - -- - - - -- - --- ---------- EX. 2" PE :P 21'W 11,4" 252's 01505-17". 1 1995 C Lr, 4 .TIE—IN TO EX. 2 MPE IP @ 21'W & 259'S C/L INSTALL 2" MPE IP MAIN @ 21'W 0�) END 2" MPE IP MA IL N - — @ 21'W & +/-509'S C/L (@ N P/L OF 250 — 4 AVE. S) G) CROSS SECTION A -A N. T. S EX. 2" MPE IP MAIN 2 I'W _j TIE-IN TO EX. 2" MPE IP MAIN (D21'W AND INSTALL 2' MPE @ 21'W C/L 11 \_ EX. WATER - 28.5' E C/L E� CURB/GUTTER/-.SIDE.VA.LK-- X x X x X X X X X X X X X X X X, X X X X C7, x X F I( TEN, F'APRI'C' x,UNDER, 'B- GRA-TE X 'x' CB INLET PROTECTION EXIST PAVED STREET NO SCALE 1) FIELD LOCA-I-E ALL UTILITIES 48 HRS. PRIOR TO CONSTRUCTION AT 1-800- 424-555. 2) INSTALL ONE POUND ANODE EVERY 1000' OF DETECTION WIRE / INSTALL ANODE AND TEST LEAD WIRES PER PSE STANDARDS. 3) ALL MAIN TIE-INS SHALL BE GAUGED AND MONITORED FOR CHECKING FEEDS. 4) INSTALL VALVES OUT OF TRAFFIC WHERE POSSIBLE. 5) ANY CHANGE IN ROUTE OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY A PSE REPRESENTATIVE. 6) ALL ACTIVE SERVICES ARE SHOWN AS 7) ALL PROPOSED SERVICES ARE SHOWN AS 8) ALL 2' X 4' PAVING CUTS SHOWN AS IM 9) ALL WORK WITHIN THE COUNTY TO COMPLY WITH EROSION & SEDIMENTATION CONTROL REQUIREMENTS OF CHAPTER 24-30-020 OF THE SNOHOMISH COUNTY DRAINAGE ORDINANCE, WHICH INCLUDES THE FOLLOWING: A. PAVED SURFACES TO BE CLEANE D OF SEDIMENT AT THE END OF EACH DAY. B. SOIL STOCKPILES, IF ANY, SHALL BE STABILIZED AND PROTECTED WITH SED- IMENT RETENTION BMP's WITHIN 24 HRS. EXCAVATED MATERIALS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, AS SITE AND SAFETY CONSTRAINTS ALLOW. C. DISTURBED AREAS MUST BE STABILIZED WITHIN 2 DAYS. EROSION CONTROL MATERIALS MUST BE KEPT ON SITE AND IN ADEQUATE CUANITIES AT ALL TIMES. NO MORE THAN 500 FEET OF CONTINUOUS TRENCH MAY REMAIN OPEN AT ONE TIME UNLESS CHECK DAMS ARE INSTALLED. D. STORM SEWER INLETS THAT RECEIVE STORM WATER RUNOFF DURING CON- STRUCTION SHALL BE PROTECTED WITH FILTER FABRIC OR OTHER MEANS TO MINIMIZE SEDIMENT FROM ENTERING THE INLET. 10) CALL SNOHOMISH COUNTY INSPECTOR 48 HRS. PRIOR TO CONSTRUCTION AT (425) 388-3385. 11 ) RETURN ALL AS-BU I LTS TO DOUG US I TALO, EVT-01 - 13 12 11 10 9 8 7 6 5 4 1 1 12"MPE CAP 52-00649 3 1 2" ELECTROFUSION FITTING 58-00470 2 250' #14 CP WIRE 85-00940 1 250' 2" MPE PIPE 70-00261 ITEM CITY DESCRIPTION PART NO. BILL OF MATERIAL FITTER (Check Box if Complete) Work area left in Clean/Safe condition. 0 Complete all Pine Tables and 0jas Pressure Stamp. C3 • Field changes Red -Lined on as -built. 0 • Material verified and Changes noted on paperwork. 0 • All Valve and Tie-in Location i noted on as -built. 0 • Note beginning of Main, EOM. & Line of Main Locations. C3 • Show Rope Locations & Cul-(Ie-sac Radius. C3 Fitter's Signature Company Employee ID# GAS MAIN INSTALLATION SAP W/O # SIZE LEN61H I YPE - MANUF AC I URER GAS MAIN RETIREMENT SAP W/O # SIZE MATERIAL EST. LENGTH ACT. LENGTH ORIG YEAR ORIG. JOB# F__1 GAS MAIR PRESSURE & TESTING TYPE TEST: PRESSURE; TESTED BY: DATE ON: TIME ON: DATE OFF; TIME OFF: IDESIGN: IINSTALLE 26 Ll 1 r 0. VICINITY MAP JOB SITE / Z.- MonsM slam, 25 )OTI ST T! PSIG SYS MAOP: PSIG D BY: CALL 1-800-424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES 5 REAL ESTATE/EASEMENT PERMIT 4 CITY OF EDMONDS 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR: D. USITALO (425) 356-7520 10/03/00 1 ENGR - POWER: REV#j DATE BY DESCRIPTION ENGR - GAS: COUNTY EMER SEC Work Center DRAWN BY: KAY KRISKO 10/03/00 SNOKOMISH NSNHG CHECKED BY: 1/4 SEC OP MAP PLAT MAP APPROVED BY: SE-23-27-0-3 _.. 160-062 163-065 FOREMEN #1: U-MAP# (POWER) C I R MAP# CIRCUIT# FOREMAN #2: MAPPING: JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# INCIDENT# EgGET 2", MPE IP MAIN EXTENSION SOUND TO SERVE PROJECT# SAP SUPERIOR ORDER# L?NER(;Y 250 - 4 AVE S 1070100097 SCALE: 1 40-7 CADD NO: ... \1 0701 0097SI. DGN q, ilia i�v JIM , it A 11101 �` fj Z LO Permit No: City of Edmonds N RIGHT-OF-WAV,CONSTRUCTION PERMIT Issue Date:q:/,:2 A. Address or Vicinity of Construction: 250 4t,h B. Type of Work (be specific): Verizon to place UG Cable xing 4th Av to supply new service to the Work Order # 2100-9PO01GR506 Acct Code 2422.10 C. Contractor: VERIZON Contact: bob) 6AANALEV Mailing Address: 2312-C W. Casino RD. Phone: 4/J5- 7/0- WT, State ri-ce'nse D. Building Permit # (if Liability Insurance: Bond: Side Sewer Permit # (if applicable) "�� I i'�) E. Commercial ff.�SiibdiVi�iqn ].-GityProjeC_v_�r'[_] Er-,,(1�,UP,,gTE, PSE, CHAMBERS, OVWD) MultifF'amily Single Family 6tl;er WO#2100-9POOIGR506 INSPECTOR- 401 F. PAVEMENT: YES E] NO G. SIZE OF CUT x H. Charge: $ CONCRETE CUT: YES NO, .? APPLICANT TO READ AND SIGN IDEMNITY. Applicant understands by his/her signature to this application helshe holds the City ofEdmonds harmlessfrom injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments'or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgra�ting this permit. - #q6 THE CONTRACTOR IS RESPONSIBLE FOR WOPMMANgffip.-AND MATERIALS FOR A Ioff i.AR-FOLLOWING THE FINAL U INSPECTION AND ACCEPTANCE OF THE WORK. ESTT4ATb-RESTORAT[ON FEES WILL BE HE . UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH, TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THEAPPLICANT. xt �;;" be in accor a + Traffic control and public s d nce with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession.. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved mai�jrial prior to the end of the workday — NO EXCEPTIONS. * Three sets of construction drawings of proposed work are required with the permit application. IRAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THA T I MUST MAKE THE PINK C9PY Of THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: Date: Dave Haw-k1n­s_-_Group Mgr. (Contractor or Agent) Access Design CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CITY ro'ved I by':rlm�" fil Time Authorized.-' Void After I 100 ,E ONLY Right-of-way Fee: Disruption Fe e/Tund 111: Restoration Fee: Total Fee: 00. Receipt Issued b�y�� UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPe ER 18.OQ OFTHE EDMONDS COMMUNITY DEVEL ME�if CODE. FINAL APPROVAL OF PERMITTED WORK:- iNsPEcT6R'S SIGNATURE DATE: For inspection requirements see Engineering'Information Handout. 9. I %--I z _0 cy) cr V- DCN:1226-1237 r�_, pn� "4- LL V-4 B- OF12X24----, tr INSIDE Q9 Lo Lo N CN:1251-1300 CN:1201-1300 3 AKF50-24 AKFI-24 �p 125" LAP 100" LAP ACC# 2422 10 DEVELOPER PLACED PVC N cn EDMDNDS PUD SUB _p TO FLD (_0 co z u cy) Ln C\ I uu CN.-1201-1275+25DD - OKFI-26 < 'VERIZON PLACE 25X 415856 125`1-21PVC W/ RISER 2303 DCN:1226-1250 SEE PLACING DETAIL ACC# 2422.10 PIF5 0 25X 47+43 #15855 - D696 DCN:1201-1225 TO CO 1-1(\l il�_ 11 u COUNT BEFORE AFTER WKR VAC DEF WKR I VAC DEF CN-1251-1275 10 15 0 10 15 0 CN.-1276-1302 0 25 0 0 25 0 IN COUNT 50+ (WKR =WKR + DED) DCA TRACKER POSTED EDMS RSU PLACING DETAIL CITY OF EDMS LLJ LU 0 �:> <l: NEW VERIZON CABLE UG 2303 D696 PRIORITY ECAS CONSTRUCTION 9-5-00 START DATE IN SERVICE DATE 9-15-00 ALL WORK COMPLETE DATE DRIVERS FOR WORK ORDER PLANT EXTENSION / DOR PUBLIC REQUIREMENT PERMITS CONSTRUCTION 0 BLANKET El STATE [d DIAL. A DIG 0 COUNTY A FLAGGING ki CITY El BRUSHING El NONE SPECIAL El CIRCUITS CAUTION POWER A UG El AE CUTS REQUIRED El YES A NO OTHER If UG El AE TELCO A UG El AE JOINT POLE 0 PUD JOINT TRENCH El PSP_&J_ El PUD El CATV El PF El GTE El cAi v R NONE El GTE FEES RETS POINT OF CONTACT El G OP El LEC 0 SP�C.CONST. 56 NONE ENGINEER DOW BRANDLEY PHONE NO.425-710-4118 TECH. BOB V. PHONE No.425-710-4144 FIELDED BY BOB FOSTER MATERIAL MATERIAL ENGR CONST CODE DESCRIPTION EST ACT 280450 125' 280480 -AKF50-24 AKFI-24 100, 398820 4688-F/50 1 FIEER GLASS WED I CERTIFY THAT THE WORK I COMPLETED ON THIS WORK ORDER AND AS -BUILT IS IN COMPLIANCE WITH VERIZON DUALITY STANDARS AS IDENTIFIED ON THE IPQIP CHECKLIST. (SIGNATURE AND DATE) 03= EXCHANGE COUNTY HALLS LAKE kNOHOMISH TITLE.PLACE ENT. CABLE FOR NEW OFFICE BLDG. NICHOLSEN BUILDING 07 -0 250-4TH AV S z 0 APPROVED BY DATE :K ac) T. 27N R. 3E SEC. SHEET1 or 1 NO.- 0') 23DD Date: To: From: Subject: MEMORANDUM September 7, 2000 Verizon 240 — 4th Ave S. Maryanne Zukowski Traffic Engineer Right of Way Permit traffic control conditions of approval The inspector shall inspect all traffic control prior to work. Traffic Control in the City Right-of-Wa All signs, barricades and related equipment and their use must be in accordance with Part IV, "Traffic Controls for Highway Construction and Maintenance Operations," of the Manual on Uniform Traffic Control Devices, as prepared by the National Joint Committee on Uniform Traffic Control Devices and per the City of Edmonds Developmental Standards. Reasonable accommodations shall be made for distance requirements in signage for geometrical conflicts. Coordination with the City Inspector prior to all work. Particular attention should be made to the following items: There shall be at all times reasonable pedestrian and vehicular access to and egress from the properties adjacent to the project, so far as possible. Contact the affected homeowners directly to prevent conflicts. The Public Safety Department (police and fire), 771-0200 and 771-0215, Edmonds School District Transportation, and the Edmonds Public Works Department 771-0235 shall be notified 24 hours prior to the construction. Proper provisions shall be made for public convenience, safety and travel. & Any asphalt concrete pavements, crushed surfacing, gravel base or water required for maintaining traffic during the life of the project shall be placed by the contractor immediately upon request by the engineer and/or inspector. 0 All unattended excavations shall be properly barricaded so as to prevent accidents. 0 Construction along or across the City right-of-way shall be as per the contract documents, City of Edmonds Standards, or as directed by the engineer and/or inspector. 0 Coordination with all other construction activities within the vicinity prior to all work. City of Edmonds 0 DCN11237 B— AE12X24-, Io C 1 0 cNdm-l= CNd2ll-l= 4 AKF50-24 ACCO 2422.10 25, ur Ac DEVELOPER PLACED PVC EDMONDS PUD SUB STA P4 —A -AKF9- TO FLO CN.-1201-1275+25DD — AKFI-26 .a— VEREWN PLAM 25X *15856 LWI-28PVC W/ 2303 DCN-12,01-1?-50 WE RJCM MTA& 0 2422AS Ac - DATE D=jjL_ LD P 0 1� STA 0 R - -- LL -�5 :,e C G 25 T 60 47+4'A (9, *15855 0 25X D696 DCN.4201-1225 TO CO LL _V <E UG --UG -*A, DLRS 3600 3600 5RJd-4OO*4RJ:f5O w w 2OOXD-JRJ:24O1-Zj HH3 DCN.4-2400 OUT LL C\l 1 147+71 c\j L—L P3 PVC-5 WAY y 149 /-32FT F3-24K' ZP3S2 LUG—MKF12-2PQQ� �3-2401-2�700 + OEM EOMS RSU PLACING DETAIL <r 3: _j W W C3 > U) �,L 0 NEW VERIZON CABLE — UG ----39'----- LVJ IPRIORITY=ECAS_l IN 8MMM DATE AU VROM C0ltPI= IDAU DRIVERS FOR WORK ORDER PLANT EXTENSION / DOR PUBLIC REOUIREMENT PERMITS CONSTRUCTION C3 BLANKET 0 COUNTY 0 FLAGGING CITY OF EDMS a CITY I BRUSHING 0 NONE - 2303 0696 CAUTION CUTS REOUIRED POWER RLIG OR 0 YES W No OTHER :UG 01 — TELCO UG C3 JOINT POLE --- 0 PUD JOINT TRENCH 0 PSP&L C] PUD 13 cATv 0 PSP&L 0 GTE 0 CATV M NONE C3 GTE FEES RED'S POINT OF CONTACT 13 GOP 0 LEc C3 SPEC. CONST. 6 NONE ENGINEER DOW BRANDLEY PHONE NO.425-710-4118 TEML BOB V. PHONE NO.42S-710-4144 FIELDED BY 4ATERI ALI R I WEST . DESNP-TICiN WACT Iq IF ICERTIF-Y THAT THE WORK I COMPLETED ON THIS WORK ORGER AND AS-BMT 19 IN COMPLIANCE WITH vmzom OIAALITY STANDARS AS ON THE VOW CHECKLIST. (SIGNATURE AND DATE) umm — HALT —LAKE I SNOHOMISH �PLACE ENT.CABLE F WE—W OFFICE BLDG. NICHOLSEN BUILDING 250-4TH AV S JRN [TI. F27NR. 37—E EC. m"I I C , , — -P City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT A. Address or Vicinity of Construction B. Type of Work (be specific): 1J0 Permit No: 0 0C (do Issue Date: 3- -/�V C. Contractor: 4UM 5^0,Vlef& Contact: 4v- E-t- Mailing Address: flt tj' A;b/V*,10C 'V#Jzphone: 4f-z 3f 7-0 State License #: 6qz4— f 5�r Or? 0 7-9 Liability Insurance: LK Bond: $ D. Building Permit # (if appliea . Side Sewer Permit # (if applable,Z:. E. F_� Commercial F] Subdivision E] City Projbct F] EUC (PUD, GTE, PSE, CHAMBERS, OVWD) F1 Multi -Family E] Single Family F] Other INSPECTOR- F. PAVEMENT: E] YES �],NO. G. SIZE OF CUT X H.,Charge CONCRETE i�UT: YES NO' IDEMNITY.- Applicant understands by his/her signatur . e to this application helshe holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City ofEdmonds or any,of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by*reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK, ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT. * Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger musi be trained as required by (WAQ 296-155-305 and must have certification verifying completion of the required'training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday — NO EXCEPTIONS. + Three sets of construction drawings of proposed work are required with the permit application.' I HA VE READ. THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQ UIREMENEV AND A CKNO WLED GE THA T I MUST Wn THE PVVK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS -1-/4-3 or Agent) CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CIT) A�,proved b," ;-'Titne Authorize,&., Void After 01 / 01 Spe'Cial Conditions: E ONLY Right-of-way Fee: - Disruption Fee/Fund Ill: Restoration Fee: Total,Fee-. 7:15 Rece ip tNo: Issued tj�� UPON COMPLETION OF PERMITTED WORK, ANENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CO E. FINAL APPROVAL OF PE RMITTED WORK. INSP�'CW' II*A�UR,�,DATE: For� inspection requiremeM9 see Engineerid" Information Handout. e g 11 I NO WORK SFIAI.I-, BEGIN I'RIOR TO PERMIT ISSUANCE I of 1:01)000 N 5(:�-'5V`01 t t">r-o pUILDINro UNC (A"RO — — — — — — — - -- - — — — — — — — — — — — — lcr V'r If. - 105ZG !!!W fr. - 105.,y- NW fr-. 1052�G N; Z — — — — — — — — — 777— -7 ------------- tl N 5c> 52200 IFT ION - ""r OUARTCK ,rMA-r FOfMON or -rtir �>r ounimnz or Tmr-,!!�r- ouAgTrg or Ttir ,-D Wjl.,�NOHOMI�->rl or!�,>r-C-TION 2.n,TOWN1�111!;E NOlZ-r;WANMr-A T Dr _r> ro C,oUt-M,WA,�511IN(BTON Zlt�,r _ IZ,5 Fr. t,5OLjrrj of, -rtlr- NE COIZNr-g ornic 0�rfelNNINa rrmr-�fr MD nz or 8rcrlON 7-�,,-roWN!�5111F !!�>r- OUAKI _ MIZ Or TMr- �r- OUARMZ OF Ttlr!�5r- OUAlZr Z-7 NOgTrl RANer '-5 r-A!5T,W J'l rm r-Ncr- !�-;bLjrrt -1-5 Fr, TMt!NCr-V/r-'!5'r 1��O f-r-I Trt MNGM NOK-rrl T5 Fr ) -rrtr-Nr-r- r- A,�:>T ��O rr.Tormr- Paw or E>r-61NNIM5. lb IF 4 ll\�� ,*'\ ?P LrnLrry I-OLr- uz� - oRwrwAy orr-NiNe I w,4crr—R MCMIZ (ML-CV:!5 Ar t0l) eNGIMIERIM 250 4TH AVE. S.. SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 C, 1Z V WA 17 L ONAL z 0 /3"N f 107 % it ---------- F_ 'lox A -4 TNS V111,12 4195 irY 1*7f, 44- 17 < A �di t. GAG DESIGN: �, 1-a % 6'a 1 j ' I, b -co KAJ!�F_- f A g� aLob 49 L V wor^.j DRAWN: zos CHECI,: GAG JOB NO: 14047.10 DATE: 02/14/14 F 10, 7=R9,� 7�4 If F"Zftl,( wwo L A UA m- 4ri A P, _j J-1 _j ul tu > Ld J4 0 �Ri Q1: lip KA" I C14 Y ,SS 00 V) V) z uj _j 1W.0, Rs�r( �V,Nwep, T y Fx Li < LJ > 3i: m :;�i Lj V) mw z E/i Ld af m z Itz w _z uj > 0 z SITE PLAN L) 04 LAJ SCALE: 1/8"= V-O" SHEET: STREET FILE FEB 14 2014 A-2 BUILDING CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS 1� ll,� Ir k�lyllz_'6 Lu MAILING ADDRESS z CITY ZIP1 ITELEPHONE liAA rj,�v q M9 n ajf;__jejj,C, -F-_� �W t U uj cc 4 ZIP T, M ("0;q4rU1,fiW 4tiorvia"e, cc ADDRESS 0 f—,)j U 104 � r i CITY ZIP TELEPHONE z A, I 0ol, L) 0 STATE LICENSE NUMBER EXPIRATIONDATE 1_�CHECKED6Y) 6f RA06e2 I Oq 0, 1 q 4 00y 4f W) ZILEGAL DESCRIPTION OF PROPEPITYr)NCLUDE ALL EASEME14TS 0 LL 40 0- P _j COUNT ��CELj _ I i4aonoq '6 NEW 14 0 RESIDENTIAL f 1 PLUMBING / MECH ADDITION fjLj COMMERCIAL COMPLIANCE OR CHANGE OF USE REMODEL APARTMENT f SIGN REPAIR GITDING YDS FENCE x DEMOLISH TANK OTHER 4 GARAGE RETAINING WALL CARPORT RENEWAL ROCKERY (TYPE OF USE U NESS OR ACT EXeLAIN kIV1 NUMBER OF NUMBER OF DWELLING CRITICAL AREAS STORIES -3-1 UNITS NA NUMBER DESCRIBE WORK TO BE DONE r-� rIA10 )P)ld QlAee I f 1PERMITEXPIRES USE PERMIT ZONE Vffj 1, 1 — NUMBER JOB SUITE/APT# ADDRESS A�t �j� LEGAL DESCRIPTION CHECK SUBDIVISION NO. LID NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved EXISTING L' REQUIRED DEDICATION RW Permit Required 0-- Street Use Permit Req'd O� Inspection Required 0-,- PROPOSED Sidewalk Required ,?.e 0 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YE NO 0 REMARKS W IAII- //1/�`,P;­­r/,, e- I V I I Z W ENGINEERING MEMO DATED REVIEWED BY ,317-7100 FIRE MEMO DATED -k- ---��JREVIEWED BY I � A LL VARIANCE OR CU ADB# SHORELINE # �171- 97- 211 /1 1?b- -9 1 - -16 SEPA REVI64 SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED E X, P I I fq LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (FT.) FRONT UR SIDE REAR t_), %h 44 vo J-)­ IV, /0// v j -) z 2 z ­ I LOT AREA 9 _ PLANNING REVIEW BY 6ATE I ­_ 11-- 1 — " I 11U1 0' ^A r,TTJ A A' I FT) CHECKED BY TYPE OF CONSTRUCTION CODE OCCUPANT /e. IA�,,q 1 7- / /-,a 6,pIVIC I qq_ . GROUPq SPECIAL INSPECT OCCUPANT' REQUIRED 2 YES LOAD A-74-2 all 15 t REMARKS PROGRESS INSPECT16NS PER'UBC 108 C-DV w FINAL INSPECTION REQUIRED IVALUATION ' I FEE 4�7 1034 Ill:;;p PLAN I CHECK FEE FrEAT §06FICE 421,0 jt(jl�_A Z I N9 % LOT SLOPE % 4,07, BUILDING 4/1- PLAI;lIrtHECK NO q0j 136 VESTED DATE PLUMBING 4Uhg- MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT CO ERS WORK TO V GRADING/FILL BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ONTHE PUBLIC zi DOMAIN (CURBS,SIDEWALKS, DRIVEWAYS, MARQUEES,ETC.) WILL REQUIRE SEPARATE PERMISSION. STATE SURCHARGE M W PERMIT APPLICATION: 180 DAY S PERMIT LIMIT. 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS _S_T.ORM_PP,.AftgUEES w "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AN D* SUCCESORS ENG INSPECTION -FEE IN INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF cc EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROV'ANY AND x ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY Air i dW ou 0 FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE _j DEEMED To MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 PLAN CHECK DEPOSIT 4yv�­ Wa< NOR LIMIT INANYWAYTHE CITY'SABILITYTO ENFORCE ANYORDINANCE PROVISION." TOTALAMOUNTDUE /0 !jr�116_1 r I I HEREBY ACKNOWLEDGE THAT � HAVE READ THIS APPLICATION; THAT THE INFORMATION / GIVEN IS CORRECT; AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION: AND IN DOING CALL THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED This application is not a permit until signed by the IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION Building Official or his/her Deputy: and Fees are paid. and WORKMEN'S COM P ENSATI ON.1 NSU RANCE AND RCW 18.27. receipt is acknowledged in space provided. (425) OW E I N OR,,AGENT) ATE SIGNED D&. OFFICIALS SIGNATURE DATE fGNA:TURE � _�A I 7A, q9 " " 12 — 771-0220 1�/ I? A17ENTION " I IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 5/98 RELEASED BY�,, DATE ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR �Z E RECEIVED CITYOF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS 11ye MAILING ADDRESS CITY ZIP TELEPHONE NAME CITY ZIP TELEPHONE q.-4 7;6 - 6-1 NAME ADDRESS A�� /07%A-d-,,a /y, CITY � ZIP TELEPHONE !Sg�� z9!2.:g �,Ia r- 771- �; oao STATE LICENSE NUMBER ' EXPIRATIONDATE 'CHECKEDBY PROPERTY TAX ACCOUNTdPARCEL NO. - 0 NEW � F] RESIDENTIAL PLUMBING / MECH 0 ADDITION COMMERCIAL 0 COMPLIANCE OR CHANGE OF USE REMODEL C3 APARTMENT El SIGN REPAIR E3 GRADING o FENCE CYDS X FT) DEMOLISH TANK OTF!j�&, o GARAGE 3 RETAINING WALL E 0 RENEWAL Z CARPORT ROCKERY (TYPE OF USE, B USINESS OR ACTIVITY) EXPLAIN: & "!'� 4Z isit2c NUMBER NUMBER OF NU r CRITICALAPAI OF DWELLING V AREAS o STORIES UNITS U -UMBER qi_pla� 7? DESCRIBE WORK TO BE DONE M.- 10 d PERMIT EXPIRES USE ZONE PERMIT NUMBER JOB SLtlTEIAPT# ADDRESS P P�T NAME/SUBDIVISION NO. L LOT NO. LID NO. LID FEE $ P U PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TIESCP Apprwed 0 RW Permit Required 0 Street Use Perinit Req'd (3 EXISTING PROPOSED Impection Required 0 Sidewalk Required (3 REQUIRED DEDICATION— FT Underground Wiring required 0 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED Y y S 0 ES0 NO 0 . cc REMARKS LU z 0 DWI WNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE z a z Uj ENGINEERING . REVIEWED/DATE DATE LU U. /VARIANCE OR Cut SHORELINE OR ADB# INSPECTION I PBOND j REO'D OSTED 0 YES 0 NO SEPA REVIEW SIGN AREA HEIGHT COMPLETE I EXEMPT ALL OWED PROPOSED ALLOWED PROPOSED EXP I I LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT LIR SIDE REAR z z PARKING LOT AREA PLANNING REVIEWED BY DATE 15 REO'D I PROVIDED I (L H CKEDBY ITYPEQFCINSTRUCTION COD OCCUPANT 1z: GROUP SPECIAL INSPECTOR JAREA OCCUPANT REQUIRED [3 YES I's Ck) son— LOAD REMARKS PROGRESS INSPECTIONS PER UBC,108/FINAL INSPECTION RE0'Dj VALUATION FEE PLAN CHECK FEE Jdt HEAT SOURCE GLAZING % LOT SLOPE % BUILDING 01 PLAN CHECK NO: VESTED DATE- PLUMBING 0 1 — I �, '--I MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE 48A=G�FILL D SEPARATE PERMISSION. 2 STATE SURCHARGE uj PERMIT APPLICATION: 180 DAYS PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS -ENS REVI I EW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION 4WC-INSPECTION FEE 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS. ASSIGNS AND SUCCESORS (A W j IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS. WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND cc Wfn6AV7,*eAe ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE RECEIP PLAN CHECK DEPOSIT ^7 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION." RECYPX7,�,_ TOTAL AMOUNT DOE I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THEOWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building Official or his/her Deputy: and Fees are paid. and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is acknowledged in space provided. WORKMEN'S COMPENSATION INSUR��E AND RCW 18.27. OF =ALS R DATE (OWNER ORyfNT) D�r (425) 771-0220 A— 1) A4C 41,41- R SE By DATE ATTENTIdf4____'---- EXT/333 IT IS UNLAWFU� TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 1 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI_ 771-022 CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL -FILE - YELLOW- INSPECTOR 5/98 FAX PINK - OWNER - GOLD - ASSESSOR kWPRT RECEIV�D �21). Aoo PERMIT EXPIR S USE ZONE PERMIT 21D0089 CITY OF EDMONDS NUMBER JOB SUITE/APT# CONSTRUCTION PERMIT APPLICATION ADDRESS OWNER NAME/NAME OF BUSINESS 4 e )�9 /11 (-- 6 IVY C- )e� t-9 L 5`�7 PLAT NAM E/SUBDIVI SION NO. LOT NO. LID NO. ft MAILING ADDRESS LID FEE Uj z TESCP Approved 0 3: — PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP RW Permit Required 0 0 00 44-- Roe Y Street Use Permit Req'd 0 CITY ZIP ELEPHONE EXISTING — PROPOSED Inspection RequIred 0 Sidewalk Required 0 REQUIRED DEDICATION FT Underground Wiring required 0 NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 0 z 7 1 P_ r- / I 1—,-- 4 1) /) � , e -, " 0 1 1 M W ADDRESS REMARKS z z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAG,E cc z 4 ��o 1p,41"Vr-" 71:6 CITY ZIP TELEPHONE be _/Z/�t /7,/- oc T j5-7ZW,<) A/'A e1,?0.;20 1/-/ 951 7 71-- 4 CAP 117� /Y �W'IIPIIVIII�,1511a_J- NAME 6- V,4 Iv2' 10eW57-,e41<:�, r/O/V ENGINEE�ING REVIEWED/DATE cc ADDRESS 0 l'- 5_0 6 PL , A/ FIRE REVIEWED BY DATE W t- CITY ZIP NE Cc z 0 .20 LL ITELEPHO `/15- ///-. 341(.7-0 STATE LICENSE NUMBER EXPIRATION DATE CHECKE15-BY VARIANCE OR CU SHORELINE OR ADB# INSPECTION [PBOND REO'D OSTED 0 YES 0 NO /4 <:�5 /05 470 _Tq SEPA REVIEW SIGN AREA HEIGHT PRO TY TAX CCOUNT PARCEL NO' COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED ED < 71 PROPOS W V _j afl; , 1 :,7? 006 9 EXP 0 NEW RESIDENTIAL PLUMBING / MECH LOT COVERAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOWED PROPOSED FRONT SIDE REAR FRONT UR SIDE REAR M ADDITION Ej COMMERCIAL COMPLIANCE OR CHANGE OF USE z I PLANNING D. BY DATE PARKING LOT AREA REVIEWE 1 F-1 REMODEL APARTMENT SIGN REQ'D I PROVIDED REPAIR C:] GRADING 0 FENCE CYDS X FT) REMARKS DEMOLISH TANK 0 OTHER Z GARAGE RETA' MING WALL C3 RENEWAL 0 CARPORT ROCKERY P: (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: X) d5 A4 0 4 CHECKEDBY. ITYPEOF% ,qNSTRUCTION CODE OCCUPANT yq- GROUP NUMBER NUMBER OF CRITICAL r ('V OF DWELLING AREAS SPECIAL INSPECTOR 17REA OCCUPANT 0 S ORIES. UNITS 4__� REQUIRED C:] YES LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REQ'D t b") y VALUATION FEE PLAN CHECK FEE HEAT SOURCE GLAZING % LOT SLOPE % BUILDING 46) PLAN CHECK NO: VESTED DATE PLUMBING MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE GRADING/FILL SEPARATE PERMISSION. STATE SURCHARGE cc PERMIT APPLICATION: 180 DAYS W PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION "APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS ENG. INSPECTION FEE w IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF, LANDSCAPING _j 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND" cc INSPECTION FEE ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE RECEIPT PLAN CHECK DEPOSIT DEEMEDTO MODIFY, WAIVE OR REDUCEANY REQUIREMENT OF ANY CITY ORDINANCE 0 NOR LIMIT IN ANYWAYTHE CITY'SABILITYTO ENFORCE ANY ORDINANCE PROVISION." x RECEIPTLnf TOTAL AMOUNT DL f I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED, AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This appli I cation is not a permit until signed by the TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION r ceigi is acknowledged in space provided. WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGN TURY OWNER OR AGENTe DATE LPN15D OFFIQIAVS SIGNATURE )ATE (425) A"I't ./ 7c) ;9/410_A� , z / I I ; i i c /(, 771-02:20 RELEASED BY DATE ATTENTION V IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL EXT 333 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 771-0221 CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 ORIGINAL - FILE YELLOW -'JNSPECTOR 5/98 FAX PINK - OWNER GOLD - ASSESSOR ME CITY OF EDMONDS ;6-NE PERMIT CONSTRUCTION PERMIT APPLICATION joB NUMBER OWNER NAME NAME OF BUSINESS ADDRESS L AtJ A \A1 (11 16- 4T ]LEGAL DESCRIPTION CHECKI SUBDIVISION NO. LID NI -61 T Y ZIP A.) c 0' NAME ADDRESS FELEPHONE NUMBER PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. oEXISTING REOUIRED DEDICATION METER SIZE LINE SIZE I NO. OF FIXTURES NUMBER T_ A N, K I o f -!� & -, 44' ADORE SS a '36 /1 U C1r_ 'S 2 CITY ZIP TELEPHONE NUMBER -7 Z '73 L) STATE LICENSE NUMBER RATION DATE Legal Description of Property - include all easements ,z S_ L 0 , t-T t P 6f 5-F, 8 AL L T H I�-i 0 r, C- YLL ".1 —,A k �. I -re, uj M A ih P 3L '7 AJ J� A ik-1 (I E ir L) 3 pa. :;77 4 W 0 CD Ile 41.� A s'V_ L - L3 Gl­tl—, 0 S � s I N 44 T I,, Lo fu 4 4 ro " 4 . IL C Property Tax Account Parcel NO. A3A 7 -03 - f- 11Y 0 FlNEW 1:1 RESIDENTIAL F1 PLUMBING ADDITION 1:1 COMMERCIAL E] MECHANICAL REMO DEL 1:1 APT. BLDG. El SIGN GRADING FENCE REPAIR — CYOS. El I x_ FT) DEMOLISH WOODSTOVE SWIM POOL INSERT El HOT TUB/SPA GARAGE RETAINING WALL/ CARPORT E] ROCKERY RENEWAL Z o (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: NUMBER NUMBER OF CRITICAL 0 OF DWELLING AREAS 03 STORIES UNITS INUMBER 5� DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN) fu-*v I r­1 " I 1"VX A 1,� , , " � A V Liz- L T AA-) k SUITE:APT 4 TESCP Approved 0 RW Permit Required 0 Street Use Permit Req*d 0 inspection Required 0 Sidewalk Required 0 Cc PAV REQUIRED W YES 0 NO 0 Z M W W Z 0 Z MEMO DATED REVIEWED BY SIGN AREA I COMP SEPA REVIEW ADB NO. ALLOWED I PROPOSED LETE IEXEMPT I I I EXP I I VARIANCE OR CU PLANNING REVIEW BY I DATE SETBACKS — FEET HEIGHT I LOT COVERAGE Z Z FRONT SIDE REAR REMARKS CHECKED BY I TYPE OF CONSTRUCTION I CODE IOCCUPANT SPECIAL INSPECTOR AHhA OCCUPANT REQUIRED YES LOAD REMARKS PROGRESS INSPECTIONS PER LIBC 305 FINAL INSPECTION REOUIRED FEE PLAN CHECK FEE BUILDING Z HEAT SOURCE: GLAZING I % PLUMBING Plan Check No. MECHANICAL T his Permit covers work to be done on private property ONLY. GRADINGIFILL Any construction on the public domain (curbs, sidewolks, driveways, marquees, etc.) will require separate permission. STATE SURCHARGE Permit Application: 180 Days Permit Limit: 1 Year - Provided Work Is Started Within 180 Days STORM DRAINAGE FEE "Applicant. on behalf of his or her spouse, heirs, assigns and ENG. INSPECTION FEE successors I n interest, agrees to indemnify, defend and hold ow harmless the City of Edmonds, Washington, its officials, i employees, and agents from any and all claims for damages of < whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT modify, waive or reduce any requirement of any city ordinance 0 3: nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE Z 4; provision." --- I hereby acknowledge that I have read this application; that the ATTE14TION APPLICATION APPROVAL information given is correct; and that I am the owner, or the duly authorized agent of the owner. I agree to comply with city and THIS PERMIT This application is not a permit until state laws regulating construction; and In doing the work authoriz- AUTHORIZES signed by the Building Official or his/her ed thereby, no person will be employed in violation of the Labor ONLY THE Code of the State of Washington relating to Workmen's Compensa- WORK NOTED Deputy; and fees are paid, and receipt is tion Insurance and RCW 18.27. INSPECTION acknowledged in space provided. SIGNATURE (OWNER OR AGENT) SIG NEO DEPARTMENT JDATE ' W CITY OF T OFF C DATE I 'S ;VA U EDMONDS A4 7 CALL FOR RELEASED BY: DATE ATTENTION INSPECTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR 771-0220 ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY . HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor E104 ow- 0741 CITY OF EDMONDS COMMERCIAL TENANT IMPROVEMENT/ REMODEL COVER SHEET Directions: Applicants are to complete the information in the WHITE BOXES ONLY (Shaded boxes are for City use only). This cover sheet must accompany each building permit application for a commercial tenant improvement/remodel project. PLAN CHECK:, # APPLICANTT re DATE RECEIVED U —9� PROJECT ADDRESS,=;�15t-) PROPERTY TAX ACCOUNT PARCEL # DESCRIPTION OF WORK -17� \f-,e OWNER CONTACT PERSON CC UNIT # PHONE Q c-)G- 44c-,- S---7�� PHONE FAX E-MAIL MAILING ADDRESS M FAX CORRECTIONS MAIL CORRECTIONS E-MAIL CORRECTIONS BY SIGNING THIS STATEMENT I UNDERSTAND THAT I AM THE CONTACT PERSON FOR THIS PROJECT. IT IS MY RESPONSIBILITY TO COORDINATE ALL SUBMITTALS WITH THE CITY AND ONLY I CAN MAKE INQUIRIES ON THE STATUS OF THE APPLICATION. I UNDERSTAND IT IS MY RESPONSIBILITY TO DETERMINE IN ADVANCE OF PERMIT SUBMITTAL ANY DISCRETIONARY PERMITS THAT MAY BE APPLICABLE TO THIS PROJECT. I ACKNOWLEDGE THAT TO THE BEST OF MY ABILITY I HAVE SUBMITTED ALL NECESSARY DOCUMENTATION IN ORDER TO MAKE A COMPLETE APPLICATION AND NO DISCRETIONARY APPROVA�S ARE �,EQUIRED. SIGNATURE DATE CODE EDITIOiiS-,'- 1997 UBC, UMC, UPC, WSEC, VIAO WITH AMENDMENTS (including State Barrier Free Code) . --J TYPE OF CONSTRUCTION NUMBER OF STORIES ?, OCCUPANCIES BASEMENTS NUMBER OF EMPLOYEES TOTAL PARKING SPACES DEDICATED TO TENANT EXISTING ............ PROPOSED STRUCTURAL CALCS PROVIDED LIGHTING BUDGET PROVIDED 11 EXISTING AUTOMATIC SPRINKLER SYSTEM [] MANUAL AUTO NONE EXISTING FIRE ALARM SYSTEM YES NO R T Y APPROVALS ADB CU OTHER PLUMBING FIXTURES WAC Table 29-A (City Use Only) OCC. SQ.FT. -WATER CLOSETS LAVATORIES Existing Propos A Existing Proposed R E M E . M E At- E BARRIER FREE RESTROOMS EXISTING PROPOSED PARKING INFORMATION (City Use Only) SPACES USE SQ.FT. FACTOR REQUIRED TOTAL SPACES REQUIRED TOTAL SPACES PROVIDED BARRIER FREE SPACES REQUIRED BARRIER FREE SPACES PROVIDED STAFF COMMENTS SEPARATE PERMITS (City Use Only) MECHANICAL/HVAC E] FIRE SPRINKLER PLUMBING GREASE TRAP Any request for modification, variance or other administrative deviation (herinafter "variance") must be specifically called out and identified. Approval of any plat or plan containing provisions which do not comply with the city code and for which a variance has not been specifically identified, requested and considered by the appropriate city offical in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. i VIAO CODE COMPLIANCE INFORMATION (Table 3-4)t7 USE OCC, LOAD/ CFM TOTAL SQ,FT FACTOR CEM STAFF COMMENTS OCCUPANT LOAD CALCULATIONS (City Use Only) USE AREA FACTOR OCC.LOAD TOTAL OCCUPANT LOAD STAFF COMMENTS PERMIT ISSUANCE APPROVALS (City Use Only) PLANNING REVIEW & APPROVAL DATE CONDITIONS OF APPROVAL: FIRE REVIEW & APPROVAL DATE CONDITIONS OF APPROVAL: BUILDING REVIEW & APPROVAL DATE CONDITIONS OF APPROVAL: L:\temp\building\forms\Tl-rvw.vsd -- 7/00 A PORTION OF SEC. 23, TWN. 27 N.2 R. 3 E*2 W.M, FIRE HYDRANT WATER VALVE-\ EXIST. SS C.O. STA. 5+21.9 RIM EL. 110.22 S IE 103.63 ALLEY GUTTER, SHEET C-3 TRASH ENCLOSURE EXIST. CB (TYPE 1) RIM EL. 109.76- RAISE TO 110.09 SW IE 108.26, 6" CP N IE 108.26, 6" SP NW IE 108.56, 6" SP RAISE FRAME & GRAr INSTALL (1) 4" RISER SECT. EXIST. CB (TYPE 1) RIM EL. 109.68 SE IE 108.48 BENCH MARK ELEVATION = 110.06 PK NAIL IN ACP STA 3+35.0. IE 102.3± INSTALL 6" TAP ON SEWER MAIN PER CITY OF EDMONDS TYPICAL SIDE SEWER DETAIL. SEE SHT. C-5. EXIST. CB (TYPE 1) RIM EL. 109.12 NE IE 107.72, 6" CP S IE 1106.90, 8" CP W IE 106.90, 8" CMP 00 EXIST. CB (TYPE 1) RIM EL. 109.91 N I E '10 6.81, 8:: C P S IE 106.81, 8 CP E IE 106.91, 6" CP U) V) NJ I l3UT7ER L'O � L./ 10. 1 1 LF .UU01 I CB# 1 q INSJ ALL- 1161bFW�LK C-L-O'Scb AkkF&t>�' I ZL AT ArMN ?Piofz 'ro 30'(1/2 ROW) SCALE: 1 "= 10' \> EXISTING ROCKERY TO REMAIN EXISTING BIR(J-1 MATCH EXISTING G7ADI, EL. 116.98 DO NOT REMOVE EXISTING LILAC EXISTING CAMELIA DO NOT REMOVE DO NOT REMOVE --116 ------ /-EXISTING UTILITY POLE TO REMAIN MAT XIS. - A.A-� A rE '130.00, N 80-52T01" E 4 y 14 /-NEW SIDEWALK .4 X UA .4 4 . L CXR& !SHALL e- E t" F6 BY �4' A 4 TXT A L 'd 4 4. Iq P_ 4 L '.4 -4 A 4 OWN F PPFDVFb rOVA A �,; L 3/4.1'X1" REDUCER 0 4 4 A-. COUPLING & 1 GATF VALVE 4 - q' % E--q TV 8 L F� 3/4- TY E .4% CORPER FIR SLAB LANDSCARE OMI c_-) /j EXT UDED CONCF ETE CURB FF EL. 112.19 IRRIGATIO EXIS. ING METE� f? F_ K, KSTALL SEE it., SHI.- C-5 I-c! 7-OTi L­ LLJ SYSTEM 4.: V 1:�Fk 0 No 1 110 VI BE DESKNED r -4, IN' o�LL MISWU) fT 2 7 3 4 5 6 7 8 9> 3"0 0 4,* 44 BY OTHEtS 1 " L -4 SCH NSTA DOUBL 4 8.5' 0" DT EC V .4 HEC VALVE EXISTING 5/8X3/4 CL L '/ I 'A A' DF EEM NDS M 4SSEh LY PER C WATER METER TO, RE MAIN AS LANDSCAPE ETER PR POSED 14 U- 0, NE k D DETi _j = :�o 0 1/11 11 A PARIKING W c (p I I I L0 0 K) En M '4 INSTALL NEW DRIVEWAY. BLDG ABO q 14' WIDE THRO�T W X 4% 57 LF 24,"w'MP 57. o B#3 27 LF 6"PVC -14% A �,x CENTERED ON FRONTAGE 0 4.3 \15 4- S=.005 S=2% M OF PROPERTY. I SEE DETAIL - A. CB#2 EXISTING ACP 4,. ON SHEET C-6. FLOW 57<'. TO BE REMOVE :, . LINE EL. APPR X. 117 uj 12 LF'TRENCH ui M t>r- wV\If4EI1t T 1z r-A I- I 1i I .'.' , . . . . . I. 4z DRAIN -"SEE 066 - . A . A pjpr� AAV 1� L-F-54 �-1101 ��v (f) f>AimT cuRS V -(-U)vJ FOC 52 THIS 'SHEET. 0 0 �L I --e-_ , ,,- 0 -F - T­ or IIZ,07 0 __D r _r 5' F -rp-r ON C_tf IDE 0- �'l 1�j L0 0 NrEVQ -bF1 F-V % j 4>� A 0 ! ]B Al 4 5 VE �D A C) r QR 4 (n 00 _31 4 12" DT 45 2 14 4 18 1p CONCRfTE CURB 4,: , ' I . 4 M 7 3"0 LOBBY 15 GUTTER r �.j L-1 FF EL. 112.19 0- ooio !1_r 40 N PVC 6" DT y-1 16 F4 P, I PF_ (TYP) G. 1/6,� �IILF 6"OPV -4 se F_ 15 P E(_ 15"T C-'7 "A 'A 8.!5, S=. 0 A4 C. J4 4 '14 "SEE SHT. C-4 FOR 14. W w A. COMPLETE ISEWER WATER 4". 4 .4 i � . . ' -:4 MP i RINFORMATION ; . . . :4 4 . /I 1 4 -4. 4.,.: 0, 1MAX* 4 CITY WILL INSTALL -4 �'4 AMP. 1-12 41 -T VkVE I v A L-1- In, -MA - 2" DOUBLE STRAP 2" CATE R�Mpol:l '!14 8rp, �­o LANDING SERVICE SADDLE Rcm PE, SDR 7 \LANUIN(3A'_L. 87 LF 9"0 P R 7 4 0 L F �OTY P�E R CORP STOP. SEE =.005 130.00' 4 ". - X 16 ­­ I ___LTB�CH MARK DETAIL SHEET C-5 2 X 0* ff -8 9-'5-2- - 0 Y ff- - - 'T'_ - I ROCKERY, HEIGHT BE D VARIES TO 3' MAX .4.4 ELEVATION = 118.17 FT. EXISTING LILAC 7.% N1b PK NAIL IN CP DO NOT REMOVE 7 7,3 CIAF-e-K A�&�KIBGY INSTALL 06ER 4'X6' OIL/WATER �EK CITY,,R6C>'_e, ASSEMBLY. SEE MATCH EXISTING GRADE, EL. 118.10 SLI SEPAR1\1OR, SEE SHT C-3 15"0 DETENTION PIPE FOP, FtkF- LI-N.6, DETAIL SHEET C-5 FOR PUD PROPERTY WATER METER SSMH (EXISTING) STA. 0+00 RIM EL 1114.35 N. IE. 1,00.00 LEGEND: [3 T BUI�LDING TELEPHONE LINE -P,T- UN I DERGROUND POWER AN P TELEPHONE LINE P OVERHEAD POWER LINE - S - D SA I NITARY SEWER LINE ST6RM DRAIN LINE - W - W#ER LINE G GAS LINE - X FE CE LINE CONTOURS CATCH BASIN 0 S�NITARY SEWER MANHOLE 0 STORM DRAIN MANHOLE Ff IIE HYDRANT GATE VALVE I ER -0- WATER METER P8WER POLE I ELEV St I au I ELEVATION \--EXIST. CB (TYPE 1) RIM EL. 112.37 FT W IE 108.37 (3ENERAL SITE PLAN A SCALE: 1 " = 10' " 1W "M BUILDING OR STRUCTURE CONCRETE SIDEWALK ASPHALT ROAD OR PARKING CONTOURS SILT FENCE SANITARY SEWER PIPE -S STORM DRAIN PIPE -D- WATER PIPE _w UNDERGROUND ELEC. -E SIGN CATCH BASIN TYPE I CATCH BASIN TYPE 11 GATE VALVE WATER METER SANITARY SEWER CLEANOUT 0 EXIST. CB (TYPE 1) RIM EL. 113.01 FT W IE 108.91 JRR ENGINEERING SCALE: 1 is = 10, Iwo DATE: 05/21/99 CION'TIZOLLEb ID015-11-Y rl Q For we_ Z" C-OV DRAWN: JES 10/16/99 PER CITY REVIEW COMMENTS ICHECKED: RKR No. DATE RE14SION CURRENT/NICKOLSON/C-1j.DWG DATE PREPARED: MAY 21, 1999 C-1 GENERAL CIVIL SITE PLAN C-2 DEMOLITION & EROSION CONTROL PLAN C-3 GRADING AND DI AINAGE PLAN C-4 SEWER AND WATER IMPROVEMENTS C-5 SEWER AND WATER DETAILS C-6 TYPICAL DETAILS C-7 SPECIFICATIONS f SURVEY NOtES: 1. THIS SURVEY WAS FERFORMED BY FIELD TRAVERSE USING A 10 SECOND "TOTAL STATION" THEODOLITE SUPPLEMENTED WITH A 100 Fr. STE EL TAPE. 2. CONTOUIR INTERVAL 1 FT. 3. PARCEL -AREA = 9,750 SQ. FT. 4. UTILITIES - UNDERGROUND STORM AND WATER LOCATIONS ARE BASED UPON AS-BLILT UTILITY INFORMATION' PROVIDED BY THE CITY OF EDMONDS. UNDERGROUND WATER INFORMATION PROVIDED BY THE CITY OF EDMONDS IS INADEQUATE TO DETERMINE ACTUAL UNDERGROUND LOCATIONS. HOWEVER ALL SURFACE UTILITY STRUCTURES SHOWN HEREON WERE ACCURATELY LOCATED BY FIELD MAPPING. 5. VERTICAL DATUM = %SSUMED ELEVATION 100 FT. AT INVERT ELEVATION FOR SANITARY SEWER LOCATED 170' WESTERLY OF THE INTERSECTION OF 4TH AVE. S. AN[ 1 WALNUT ST. GENERAL NoTco; IT THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION, AND SHALL CALL THE UTILITIES UNDERGROUND I.00ATION CENTER AT (1 -800-424-5555) TWO WORKING DAYS BEFCRE BEGINNING EXCAVATION. ALL EXISTING UTILITIES MAY N BE SHOWN ON THE PLANS. THOSE UTILITIES SHOWN ARE APFIROXIMATE. THE CONTRACTOR SHALL USE DUE CARE AND CAUTION DURING EXCAVATION FOR NEW UTILITIES AND ALL COSTS OF IDENTIFYING, MAINTAINING, PROTECTING, STABILIZING ND/OR REPAIRING SAID UTILITIES SHALL BE INCLUDED IN T-IE PROJECT BID AMOUNT. CONTRACTOR SHALL RECORD THE LOCATION OF ALL EXISTING UTILITIES ENCOUNTERED AND IMPRCVEMENTS INSTALLED DURING CONSTRUCTION ON THE RECORD DRAWINGS. THE CONTRACTOR SHALL 7AKE ALL NECESSARY PRECAUTIONS TO AV016 EROS ION/SEDI M -_NTATI ON DURING CONSTRUCTION. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE DISPOSED CONTRACTOR I A MANNER CONSISTENT WITH STATE AND- LOCAL REGULATIONS. UNLESS OTHERWISE AGREED, NO SEPARATE PAYMENT WILL BE ALLOWED FOR REMOVAL OR DISPOSAL OF MATERIAL. ALL WORK ASSOCIATED WITH THIS TASK SHALL BE CON TAL TO THE PROJECT. THIS PLAN SHEET IS NOT INTENDED -TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOR IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTUIRAL, ELECTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. .81QNA(3E: CONSTRUCTION PERIOD RI HT -OF -WAY SIGNAGE SHALL COMPLY WITH CITY OF EDMONDS EQUIREMENTS AND PART VI OF THE MANUAL ON UNIFORM T FFIC CONTROL DEVICES (MUTCD). k, APF-7.1- IN DATE:--M am� V7; CITY ENGINEER iED I Z�- THE NICOXOLSON OFFICE BUILDING OWNER: BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 (425) 771-8475 ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering 16030 52ND Ave. W., Edmonds, WA. 98026 1(425) 787-6020, FAX 742-5221 1 SHEET c - 1 OF1��,4, 7 SHEETS t A PORTION OF SEC. 23, TWN. 27 N, R. 3 E*j W.M. I FIRE HYDRANT VVAI.t.N VALVE-\ EXIST. SS C.O. STA. 5+21.9 RIM EL. 110.23 S IE 103.63 EXIST. CB (TYPE 1) RIM EL. 109.76------�, SW IE 108.26, 6" CP N IE 108.26 ' 6" SP NW IE 108.56, 6" SP EXIST. CB (TYPE 1) RIM EL. 109.68 SE IE 108.48 BENCH MARK ELEVATION = 110.06 PK NAIL IN ACP LOCATE EXISTING SEWER SERVICE, CUT & CAP AT PROPERTY LINE & ABANDON cN4 SIDE SEWER IN PLACE. P EXIST. CB (TYPE 1) RIM EL. 109.12 NE IE 107.72, 6" CP S IE 106.90, 8" CP 00 EXIST. CB (TYPE 1) - RIM EL. 109.91 N IE 106.81 8" CP S IE 106.81: 8" CP E IE 106.91, 6" CP FILTER FABRIC MATERIAL 2" BY 2" BY 14 GA. WIRE FABRIC OR EQUIV. PROVIDE 3/4')-1.511 WASHED GRAVEL BACKFILL IN TRENCH AND ON BOTH SIDES OF FILTER FABRIC ON THE SURFACE 2X4 WOOD POST ALT: STEAL FENCE POSTS 6' O.C. (TYP.) U) (n PLACE FILTER FABRIC UNDEf 1, GRATE T I I,,-- S c SIMH EXIII ING) STA. 0 0 0 RIM E 114.35 N. IE. 100.00 NOT TO SCALE IME r CD C-4 SAWCUT EXISTING ACP AT NORTH PROPERTY LINE & 1' WEST OF WEST PROPERTY LINE AND REMOVE & DISPOSE OF APPROXIMATELY 1970±SF AS REQUIRED. ALTERNATIVELY, CONTRACTOR MAY SAWCUT & PULVERIZE IN PLACE. —EXISTING BIRCH DO NOT REMOVE 130.00' 89-52'01" E 2 C14 1970±SF. ACP TO BE REMOVED LO 61, REMOVE EXISTING TREES XCEPT WHERE OTHERWISE SHOW SEE ARCHITECTURAL PLANS FO ADDITIONAL LANDSCAPE AND VEGETATI N I RETENTION REQUIREMENTS 16" DT 12" DT EXISTING LILAC DO NOT REMOVE DISCONNECT EXISTING OVERHEAD SERVICE & RECONNECT FOR TEMPORARY SERVICE CONNECTION.---\ EXISTING ROCKERY TO REMAIN EXISTING CAMELIA_\ DO NOT REMOVE 0 :�E 0 LLJ ct� C/) x M 0 V) 0 V) 0 D 0 30'(1/2 ROW) I SAWCUT EXISTING SIDEAALK AT PROFERTY /1' LINE AND REMOVE & DISPOSE OF CONCRETE ALONG FRONTAGE AS REQUIRED. SEE NOTEQITHIS SHEET /-EXISTING UTILITY POLE T RE -4 SAWCUT EXISTING CL 3 AND GUTTER EACH S DE OF EXISTING DRIVEWW & 4 REMOVE & DISPOSE )F CONCRETE 0 4 IZZ::Z Cl) T.4 EXISTING 5/8X3/4 4 WATER METER TO REMAIN AS LANDSCAPE METEF SHUT OFF ETER & - q4 CONFIRM PE & W CONDITION EXISTING OF RVICE 4 SAWCUT & REMOVE LINE. DISC NNECT EXISTING CURB AND EXISTING ATER GUTTER AT THIS LOCATION SERVICE METER Ld '4 IFOTHER THAN COPPER R C) 0 'Coll POLYETH ENE IN 6 GOOD C DITION. r_ 4.4 q 00 : , 4 ... /—CONCRETE CURB 4 GUTTER 4 4 W SAWCUT EXISTING 31DEWALK AT '.4q . '4 PROPERTY LINE A D REMOVE C DISPOSE OF CONC ETE ALONG FRONTAGE AS REQ IRED. SEE NOTEQ)THIS SHEET IBENCH MARK �F89*52 00" _E ROCKERY, HEIGHT ..4.4 ELEVATION = 118.17 FT. E\7 71 PROPERTY LIN VARIES TO 3' MAX PK NAIL IN ACP EXISTING LILAC COINCIDES WITH DO NOT REMOVE 113 CLEARING LIMITS ON I-N \ NORTH & SOUTH 15"0 DETENTION PIPE r_1 FOR PUD PROPERTY I WATER METER EXIST. CB (TYPE 1) RIM EL. 112.37 FT W IE 108.37 SCALE: 1 " = 1 14" DT EXIST. CB (TYPE 1) RIM EL. 113.01 FT W IE 108.91 41 W I VJF.NF.KAL NUT 15: THE CONTRACTOR SHALL TAKE17LLNECESSARY PRECAUTIONS TO AVOID EROSION/SEDIMENTATION DURING CONSTRUCTION. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE DISPOSED OF BY THE CONTRACTOR IN A MANNER CONSISTENT WITH STATE AND LOCAL REGULATIONS. UNLESS OTHERWISE AGREED, NO SEPARATE PAYMENT WILL BE ALLOWED FOR REMOVAL OR DISPOSAL OF MATERIAL. ALL WDRK ASSOCIATED WITH THIS TASK SHALL BE CONSIDERED IN"31DENTAL TO THE PROJECT. THIS PLAN SHEET IS NOT INTEN DIED TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOR IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, AND SCALE: 1"=10' THE FOLLOWING CIVIL SHEETS FDR ADDITIONAL CONSTRUCTION ITEMS. NOTE(D EXISTING CURB, GU7 R AND SIDEWALK TO BE INSPECTED BY CI�Y ERGINEERING INSPECTOR. [PHONE: (425) 771j-0220 EXT. 329] REMOVE AND REPLACE AS REQUIRED. JRR ENGINEERING SCALE: 1 it = 10' DATE: 05/21/99 DRAWN: JES CHECKED: RKR FILE NAME: NICKOLSON/C-2DEMO 4 4 STABILIZATION OF EXPOSED AR ALL SOILS EXPOSED BY LAND DISTURBING ..4 ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMP's, INCLUDING, BUT NOT LIMITED TC, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCH[ ALL BMP's SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANC WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDIN TO AN APPROVED TIMETABLE. (TYPICALLY, NO 44 SOILS SHALL REMAIN EXPOSED OR MORE THAN TWO (2) DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NOICORE THAN SEVEN (7) DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 4v' 44 4.. CONSTRUCT1011 SEQUENCE 1I.Schedule and attend Pre-coistruction meeting w/City of Edmonds. Call one -call at 1-800-424-5555 V) 2.Provide construction staking or limits of clearing, line and grade of proposed utilities and misceflaneous structures as shown on the approved construction plans. Z' 4' Ln. 3.lnstall temporary erosion anc sedimentation control (TESC) measures as shown on x these plans and required by t e City. 4.Sawcut, remove and dispose of pavement from areas to receive landscape, 4 . J building, or other improvements. 4>� WQ 5.Clear, grub and haul material from the site and dispose of as required. 6.Rough grade for proposed access construction, drainage improvements, and 4<1� utility alignments. 7.Construct improvements as hown on the approved plans (drainage, utilities, paving, etc.). A V A 8.Perform final grading, cleanlp and application of ground cover. 4 9.Remove TESC measure /1\ 10/18/991 PER CITY REVIEW COMMENTS No. d DATE I REVISION I DATE PREPARED: MAY 21, 1999 \AG �p R = 25' MIN.--1 ,+"-8" QUARRY SPALLS 12" MIN. THICKNESS AS REQUIRED 100' MIN. EXCEPT MAY BE REDUCED TO 50' MIN. FOR SITES WITH LESS THAN 1 ACRE OF EXPOSED SOIL. !'gy;ev PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA NOT TO SCALE ";top Will AW-7 W. a M y r c -2 7 2000 CITY ENGINEER SHEET TITLE: THE NICKOLSON OFFICE BUILDING DEMOLITION & OWNER: BRUCE NICKOLSON TESC PLAN 9829 CHERRY ST. EDMONDS, WA 98020 JOB NUMBER: (425) 771-8475 SHEET RKIR 99-36 ENGINEER: Ronald K. Rlach, P.E., d.b.a. JRR Engineering C — 2 APP'D WENT NO.: 16030 52ND Ave. W., Edmonds, WA. 98026 OF (425) 787-6020, FAX 742-5221 7 99-36 SHEETS 1! 41 it TIM K -me r, CS-ev 1 5 V, \j� CAMELjjA it _1k 41 W- x- rq m- -t-* 4- -4. L__ A. -1 A T -4 -T 1�01 WROo2 T15 Pe+2, OlTy,15TIF -2 r Ei� tm!5q P�WKSFZ� it 0 L it, _R It It _a� it LILL& li�� . -.6 q!p -W, U. 7� �j I W/O ro H \A/, Pj:;�NS— K� t5, IPA W�y � % a 'k 7 Mll P': zA 01TT 15TP5 .0 -MOLIT]ON PLAN - 1/16 T. q DE ALI *qT fa;�hc, K, % 7 1! 1 W, ww! I it I I , I LANDSCAPING NOTES. 1% Contractor �hall be responsible for familiarizing himself with all other site improvements prior to starting landscape work. 2. Contractor shall use caution while excavating to avoid disturbing any existing utilities. If any are encountered, contractor is to promptly advise general contractor. 3. Notify general contractor or architect if any drainage problems are found during const ruction. . 4. Upon, completion of finish grading, perform fine grading re�uired in planting areas, using S. oil obtained from the site. All plant material shall conform to AAN standards for nursery stock, latest edition. Bare root material shall be accepted for those plants for which it is appropriate if planting occurs st between October 31 and March 15t'. Verify with architect. 6. Plant nursery stock immediately upon delivery to the site and approval by the owner except that, if this -is not feasible,'heel-in all bare root and balled materials with damp soil and protect from sun and wind. 7. Planting: Fill holes with backfill mixture of three parts soil taken from the 11ole and one parl peat moss by volume. 8. Fertilize all plant material with Agro transplant fertilizer 4-2-2 (per manufacturers. recommendation) and 21 gram tablets (4 per tree, 2 per shrub, and 25.gram. tables per groundco'ver). 9. Install a minimum of 2" medium bark mulch in all planting beds. it D C&A P ^H` D-1 I -PLAN T I N G ut i1SYMBOL "ROTANW�&L./COMMONNAME' QUANITY. SIZE ....SPAWNG �s65K 619Z '14TUN\ PW Ag� APP�t5` I W, 16 if 120,! 5) V&r P nc� Hy pl;Z'i P U 1�� At,�, EP� ­��-T * 0 K- - I W H i fe 5 F I H r, nz r14e9*T1.HA (.0 qwb, R p 7 uq� -upw PF191 WN H07C-o", rp�,Ov I P 5 N-,\ I cKoo- Po Z- L,7kep F I ri, P�kpg 6H I P, L) 9 10 /V\ 1.1f. r-, IkL-L.- P��Wrllllls_ 1X\F_5A05# 1.40 I �'qV7, -e — - 40; 6� lo 11 /P 1. e) & * 0 1 LI W LU T _W -�-,)'Q'rFL4)PW 62Pt�6 A LEV �.E A NO H 7r *Lo?�V All --clew 4:� 19j- - - -, - I x jor 7M& N, �7 Flom 7: 10 - . I �L =\. !1 .4, . KANIe 17, 'KAAAr j Clio* r !VV. -Y T),j OC&D 00000, A0 MNI PAC I to, 1 �4 5, T e SiTE.'! -PL N. 14�1_ Tr -A ftRMNOTLAR., .... .. .... A � rze_o LA 7 A K F=-,Y' 7- WuHr�"H(VT Cot ns, Dad _7' KI _J� -20 1999 1.1 f z z \ j DEVEL PMENT SERVICES CTQ_ Pvp ITY OF EDMONDS X. _=*9440"M 0 "To JUAI OP".. 1999 op V1 .Z ff D6,S CrR. �VAh"LAIJON OF AVELRAU, ELXVAjJVa2,UML. 'Ille el MGM 1111111111bers indic, tied bclOw Were difCcIlySpolled at die proposed b i ig IR comets or tare lideq3olations of EXE,'UING GRADE for flie Pfojectcd Comers (froin survey prepared by Chadwick and Wbilers, 111C., P.S.. May. 1998.) qv,Te:. Q1150ELW �AAIT Kep- NORTI IWEsT CORNER SPO-n-ED (@: 112.15 NOwni FA' Tl* CORN r- R INTERPOLATED (0: 114.51 souTi iwEs*r CORNER -SPOITED rd: 111.26 C. 111WRN I CORNER SPOTTED 11,114.50 > T(A'ALS: 452.42' 4 3.11, 113'- 1 5/16"(AVERAGE- ELFVJVFION) 0 W Z W 0 "o, W Too. UJI X -S D. BY 3 S 0 s, 0 60 /@ A040 Q0)/ 0/ —50 t NN U�114 07, 60 t ING '_LA NDS CAPE PL A* A j!rA,/4L_ 07.'! it QF191�.. ON ��46 �o I OCT 20 1999 Vic ,Rl'y O"F"'ESDFA4RfLwcD-,Ss crq, Cape 111. 7�q r-T-AT 101) V6 H l\J11. 5�45 WW cee \ : Q —1, rA p fl I/ L41 f;�r C42' wl'W'Ai�vvl; W'of' 11 1-�2 119, 7, Owl kkX -A v�A 5; . 2 r." e"'�/ ,Ile EXIST. SS C.O. STA. 5 + 21.9 RIM EL. 110.2" S IE 103.63 ALLEY GUTTER, SHEET C-3 TRASH ENCLOSURE EXIST. CB (TYPE 1) RIM EL. 109.76- RAISE TO 110.09 SW IE 108.26, 6" CP N IE 108.26 ' 6" SP NW IE 108.56, 6" SP RAISE FRAME & GRATE INSTALL (1) 4" RISER SECT. EXIST. CB (TYPE 1) RIM EL. 109.68 SE IE 108.48 BENCH MARK ELEVATION = 110.06 PK NAIL IN ACP STA 3+35.0. IE 102.3± INSTALL 6" TAP ON SEWER MAIN PER CITY OF EDMONDS TYPICAL SIDE SEWER DETAIL. SEE SHT. C-5. EXIST. CB (TYPE 1) RIM EL. 109.12 NE IE 107.72, 6" CP S IE 106.90, 8" CP W IE 106.90, 8" CMP IQL v) Is 0 134 R 0 6 0 L.L -, I N D c-,111 VUTIER 04 u) L.A 10. 1 wl A PORTION OF SEC. 23, TWN. 27 N., R. 3.E.) W.M. EXISTING BIRCH DO NOT REMOVE 130.00' N 89-5i7017' E .4 4 -.4 4 4 4.- :4 1.4 rA -I V-7 1\ It �y \ V SLAB EXTR .,UDED CONCRETE CURB FF EL. 112.19 <STALL SEE DETAII., SHT. C- 3 14 No 1 L� 3"o 2 3 4 ZN I/ SCH 0 PI f 0 8.5' TYP 0 -.4. PRI POS -D 3: to 0 PARIKING W to V) BLDG ABOVE. 4% 57. ->%9.1 57 LF 24 CMP CB# S=.005 . I - EXISTING ACP /-i TO BE REMOVE� ():5e t>F- LuWf4Et%( ' TOIZM �IHAk PAV6 Lessx _r(No r-FE T­ or OVE-7p, 12 13 0 LI - FIRE HYDRANT WATER VALVE-, " \_ INS -TALL- 1�61bF �LK_ C_L-05C[> ZL Sl&�bk6-F_ AfT '>A) T-OM PIP'loo. -ro C-LOSIMC, -61bF7u)ALIC Fk>Z c_0Ne.-rp_0c_T 10;q. 30' (1 /2 ROW) EXISTING ROCKERY TO REMAIN XISTING LILAC EXISTING CAMELIA M I ATCH EXISTING GRADIf, EL. 116.98 DO NOT REMOVE DO NOT REMOVE CEXISTING UTILITY POLE TO REMAIN 144 SCALE: 1 "= 10' S I ALL JIK_1�.CAS corts:5 As _,SHOWN /-INLW NUtWALK T A L 'ST-4�S- CORG SHALL 3-F_ t- F6 By csiz )4 11 Vj Ir*_'1 op- 4. A. if, i.:: - I 1�/ ��I'Xl REDUCER 3/4, FrwVFb r.-OVAL�.­) <�;, �w - -7 5 0 " DT 14 12" DT LOBBY FF EL. 112.19 �Vc k/ 16)" DT A I COUPLING & 1 GAT� VALVE 4 A, I, TYPE 44.. 8 � Fj 3/4 N1 4 4 71 4 LANDSCAWE A -y 4 p z 2 Tw COPPER FROM 77T A IRRIGATIC q EXIEYING ME�l rER R.5, 1-ij /"A, SYSTEM "0 4.: V IN T&LL NF�qm, -.10 4 6 7 8 9> BE DESK NED 4q, BYOTHEIS G-, 44 7�- Al S > 4 N TA DOUBIL 4: HEC VALVE LJ EXISTING 5/8X3 14 . .0 4. SSEN LY PER 11� A' 00 0 IZ: Eli- 4 WATER METER TO, RE MAIN AS LANDSCAPE METER 'A. F EIM NDS 11 1-41 0 TAN E k D DQ < v) M > �4 INSTALL NEW DRIVEWAY. >< W W Qj 14' WIDE THROA CB#3 1/27 LF 6"PVC I d 'T 0 M0. Y CENTERED ON , FRONTAGE 0 0C 9': S=2% MIN. OF PROPERTY. ISEE DETAIL 4,. ON SHEET C-6. F W 12 LFF` TRENCH .4 LINE EL. APPROX. 117.7 Ld 4Z 4 DRAI�-'*SEE DETAIL 0 THIS 11 HEET. 41 S 0 N '0 R S. V u;pvj FOf PAimT cu 6 r;l 6�,RAT E e I Z,07 D q "04 5' r-F-r:;-T- oN CH 0 ul CI_ t" P % j �4>� W fA A. F 61 14 "PVC MIN. CH D T IL E 7A cl cQ 0 .4 �.i I R F-i 010 � L6 tlerM11,11111D. 00- 31 45 .4. 4, 15 1P/ 17 .18 q /-CONCR6E CURB G UT�' 9 .4 ER C.O.#2 Q2 Per .4�2 ------ 4 4 CATEE�- R MP. RAMP. I % 27 VAL, F S 00 Q, EXIST. CB (TYPE 1) RIM EL. 109.91 N I E 10 6.81, 8:: C P S D S IE 106.81, 8 CP T E IE 106.91, 65" CP SSMH (EXISTING) STA ' 0+ 0 RIM EL P114.35 N. IE. 100.00 LF 2"0 LANDING E, SDR 7 -j 87 LF 9"0 PE- 130.001 2 X 0* N 89*52'06" E_ BE D EXISTING LILAC DO NOT REMOVE 4'X6' OIL/WATER SEPARATOR,,SEE SHT C-3 15"0 DETENTION PIPE FOR PUD PROPERTY LEGEND: ED BUI�LDING T - TELEPHONE LINE -P,T UN DERGROUND POWER AN TELEPHONE LINE P - OV RHEAD POWER LI�E - S S�NITARY SEWER LINE D - STORM DRAIN LINE - w WA�TER LINE I G - GAS LI N E - X FE�CE LINE CONTOURS C TCH BASIN 0 SAINITARY, SEWER MANHOLE 0 STORM DRAIN MANHOLE \c� FIff HYDRANT M GATE VALVE I ER W�TEIR METER -0- P?WER POLE . ELEV SPOT ELEVATION EXIST. CB (TYPE 1) RIM EL. 112.37 FT W IE 108.37 I p F_ (Typ) !4 5FF_ '5�PEC_ S'AT C-7 '4 q.* .,4 '4 W 4 S EE SHT. r'-A FOR E TS A� OMPLET EVER & WATER . . . . . . . . .4 4' -CITY WILL INSTALL A 41 2" DOUBLE STRAP SERVICE SADDLE & CORP STOP. SEE --,,,�DIR 7 4' 40 LF _�O TYPE K COPPER - - ROCKERY, \7.VARIES I 7_W�T7�__ HEI HT 9:.,.4 \-44 1 - 18 '�H MARK IDETAIL SHEET C-5 TO 3' MAX 15. ELEVATION = 118.17 FT. 74 INST6u, bigL-WECIOR 1, . 19. PK NAIL IN ACP C(AF-e-K Ae,,Sl�,KISGY INSTALL 2" METER e�/ T' LE F, C IT Y,,�R FQCS ASSEMBLY. SEE MATCH EXISTING GRADE, EL. 118.10 F-OP, FtkE LIN9, DETAIL SHEET C-5 GENERAL SITE PLAN A SCALE: 1 " = 10' BUILDING OR STRUCTURE CONCRETE SIDEWALK ASPHALT ROAD OR PARKING CONTOURS SILT FENCE SANITARY SEWER PIPE -S STORM DRAIN PIPE -D- WATER PIPE W_ UNDERGROUND ELEC. -E SIGN CATCH BASIN TYPE I CATCH BASIN TYPE 11 GATE VALVE WATER METER M SANITARY SEWER CLEANOUT 0 EXIST. CB (TYPE 1) RIM EL. 113.01 FT W IE 108.91 WATER METER IL,e � LL. rth INSrA "':5-1bF-vJALk C-L-Osl - A14F-4b'/ Ar WALMU7- -!5�TP_('F_Tj. Pi-,10e To c"s11,14, - 60' ROW 'S1bj;�VJ4\LK- FSk JRR ENGINEERING SCALE: 1 90 = 10, 1 1 DATE: 05/21/99 A\ C'0N'T90tLEb 'DVII.Ify rILL For-e- Z## DRAWN: JES 10/1009 PER CITY REVIEW COMMENTS rwrrterne PVP KI n A +C- V. r% r_ V 101 V114 FILE NAME: CURRENT/NICKOLSON/C- 1j.DWG DATE PREPARED: MAY 21, 1999 C-1 GENERAL CIVIL SITE PLAN C-2 DEMOLITION & EROSION CONTROL PLAN C-3 GRADING AND DRAINAGE PLAN C-4 SEWER AND R IMPROVEMENTS C-5 SEWER AND WATER DETAILS C-6 TYPICAL DETAILS C-7 SPECIFICATIONS SURVEY N0`+E-9: 1. THIS SURVEY WAS FERFORMED BY FIELD TRAVERSE USING A 10 SECOND "TOTAL STATION" THEODOLITE SUPPLEMENTED WITH A 100 FT. STEEL TAPE. 2. CONTOUR INTERVAL = 1 FT. 3. PARCEL AREA = 9,750 SQ. FT. 4. UTILITIES - UNDERGROUND STORM AND WATER LOCATIONS ARE BASED UPON AS-BLILT UTILITY INFORMATION PROVIDED BY THE CITY OF EDMONDS. UNDERGROUND WATER INFORMATION PROVIDED BY THE CITY OF ED14ONDS IS INADEQUATE TO DETERMINE ACTUAL UNDERGROUND LOCATIONS. HOWEVER ALL SURFACE UTILITY STRUCTURES SHOWN HEREON WERE ACCURATELY LOCATED BY FIELD MAPPING. 5. VERTICAL DATUM = �SSUMED ELEVATION 100 FT. AT INVERT ELEVATION FOR SANITARY SEWER LOCATED 170' ± WESTERLY OF THE INTERSECTION OF 4TH,AVE. S. AND WALNUT ST. GENERAL N0TES: THE CONTRACTOR SHALL ERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION, AND SHALL CALL THE UTILITIES UNDERGROUND I.00ATION CENTER AT (1-800-424-5555) TWO WORKING DAYS BEFCRE BEGINNING EXCAVATION. ALL EXISTING UTILITIES MAY NDT BE SHOWN ON THE PLANS. THOSE UTILITIES SHOWN ARE APFIROXIMATE. THE CONTRACTOR SHALL USE DUE CARE AND CAUTION DURING EXCAVATION FOR NEW UTILITIES AND ALL COSTS OF IDENTIFYING, MAINTAINING, PROTECTING, STABILIZING AND/OR REPAIRING SAID UTILITIES SHALL BE INCLUDED IN TIE PROJECT BID AMOUNT. CONTRACTOR SHALL RECORD THE LOCATION OF ALL EXISTING UTILITIES ENCOUNTERED AND IMPRCVEMENTS INSTALLED DURING CONSTRUCTION ON THE RECORD DRAWINGS. THE CONTRACTOR SHALL TAKE ALL-W, -CESSARY- PRECAUTIONS TO AVOID EROSION/SEDIMENTANON -4 - DORIN��_%CONSTRUCTION. MATERIAL TO BE REMOVED FROM THE SITE SHALL BE DISPOSED OF BY THE CONTRACTOR IN A MANNER CONSISTENT WITH STATE AND LOCAL REGULATIONS UNLESS OTHERWISE AGREED, NO SEPARATE PAYMENT WILL BE ALLOWED FOR REMOVAL OR DISPOSAL OF MATERIAL. ALL WORK ASSOCIATED WITH THIS TASK SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. THIS PLAN SHEET IS NOT INTENDED TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOR IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTUIZAL, ELECTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. ISMNAGE: CONSTRUCTION PERIOD HT OF -WAY SIGNAGE SHALL COMPLY WITH CITY OF EDMON DS EQI; IREMENTS AND PART VI OF THE MANUAL ON UNIFORM Tj FFIC CONTROL DEVICES (MUTCD). `0 R AP EMTg:._M 1 -7 �zo dr p CITY ENGINEER SHEET TITLE: THE NICKOLSON OFFICE BUILDING GENERAL CIVIL OWNER: BRUCE NICKOLSON SITE PLAN 9829 CHERRYST. EDMONDS, WA 98020 ZKk JOB NUMBER: (425) 771-8475 SHEET RKR 99-36 ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering C - 1 APP'D WENT NO.: 16030 52ND Ave. W., Edmonds, WA. 98026 OF 99-36 (425) 787-6020, FAX 742-5221 7 SHEETS EXIST. SS C.O. STA. 5 + 21.9 RIM EL. 110.2� S IE 103.63 EXIST. CB (TYPE 1) RIM EL. 109.76----\ SW IE 108.26 ' 6" CP N IE 108.26, 6" SP NW IE 108.56, 6" SP EXIST. CB (TYPE 1) - RIM EL. 109.68 SE IE 108.48 BENCH MARK ELEVATION = 110.06 PK NAIL IN ACP LOCATE EXISTING SEWER SERVICE, CUT & CAP AT PROPERTY LINE & ABANDON SIDE SEWER IN PLACE.- EXIST. CB (TYPE 1) RIM EL. 109.12 NE IE 107.72, 6" CP S IE 106.90, 8" CP EXIST. CB (TYPE 1) - RIM EL. 109.91 N IE 106.81 8" CP S IE 106.81: 8:: CP E IE 106.91, 6 CP U) 0 0 00 LL_ -PLACE FILTER FAB IC UNDE GR E 00 V__ FILTER FABRIC MATERIAL 2" BY 2" BY 14 GA. WIRE FABRIC OR EQUIV. PROVIDE 3/4"-1.5" - WASHED GRAVEL BACKFILL IN TRENCH' AND ON BOTH SIDES OF FILTER FABRIC ON THE SURFACE 2X4 WOOD POST ALT: STEAL FENCE POSTS 6' O.C. (TYP.) SSMH (EXISfING) STA. 0+00 1 RIM EL 114.�5 N. IE. 100.00 NOT TO SCALE SD C) - I C-4 �A PORTION OF SEC. 23, TWN. 27 N*2 R. 3 E., W.M. SAWCUT EXISTING ACP AT NORTH PROPERTY LINE & 1' WEST OF WEST PROPERTY LINE AND REMOVE & DISPOSE OF APPROXIMATELY 1970±SF AS REQUIRED. ALTERNATIVELY, CONTRACTOR MAY SAWCUT & PULVERIZE IN PLACE. EXISTING BIRCH DO NOT REMOVE P 130.00' 'L N 89*52'01" E CA 1970±SF ACP TO BE REMOVED CD 1�� 070 REMOVE EXISTING TREES �XCEPT WHERE OTHERWISE SHOWN. SEE ARCHITECTURAL PLANS FO� ADDITIONAL LANDSCAPE AND VEGETATION RETENTION REQUIREMENTS1' 16" DT EXISTING LILAC DO NOT REMOVE 5% a Is] t, EXIST. CB (TYPE 1) RIM EL. 112.37 FT W IE 108.37 SCALE: 1 1 12" DT EXISTING LILAC DO NOT REMOVE 14" DT DISCONNECT EXISTING OVERHEAD SERVICE & RECONNECT FOR TEMPORARY SERVICE CONNECTION.--\ EXISTING ROCKERY TO REMAIN EXISTING CAMELIA DO NOT REMOVE LLJ > 0 0 LLJ �7 n-, V) M x LL] 0 Cf) 0 0 0 ----116 SHUT OFF PETER & CONFIR M PE & N CONDITION OF EXISTING "Ill RVICE SC LINE. DISC NNECT EXISTING ATER A SERVICE METER R IF OTHER THAN Tl' COPPER R R POLYETH ENE IN GOOD C DITION. __j 3QQp' N 89'52 00" E ROCKERY, HEIGHT - \\\—PROPERTY LINE\7VARIES TO 3' MAX COINCIDES WITH 113 CLEARING LIMITS ON RTH & SOUTH PROPERTY EXIST. CB (TYPE 1) RIM EL. 113.01 FT W IE 108.91 41 30'(1/2 ROW) I FIRE WATER VALVE AWCUT EXISTING SIDE:ALK AT PROFERTY LINE AND REMOVE & I ISPOSE OF CONCRETE ALONG.FRQNTAGE AS REQUIRED. SEE NOTEQ�THIS SHEET —EXISTING UTILITY POLE T REMAIN SAWCUT EXISTING CU B AND GUTTER EACH S E OF EXISTING DRIVEW&I REMOVE & DISPOSE CONCRETE 0 C/I T1 EXISTING 5/8X3/4 WATER METER TO RE MAIN AS LANDSCAPE METER W -SAWCUT & REMOVE EXISTING CURB AND GUTTER AT THIS LOC*ATION <!� CL 00 /—CONCRETE CURB GUTTER -SAWCUT EXISTING IDEWALK AT PROPERTY LINE A D REMOVE & C DISPOSE OF CONC ETE ALONG FRONTAGE AS RE6 IRED. SEE NOTE�DTHIS SHEE IBENCH M WATER METER SCALE: 1 10' -4 4 4 4 .. Aj* 44 . . . . . * . -* A"'. q... 4. 4 Z' x 411 4>� CL* : A �4 _1- 1 '4 -4 '.I. A /ATION =1 118.17 FT. NAIL IN ACP NOTE�a> EXISTING CURB, G R AND SIDEWALK TO BE INSPECTED BY CI"U7EI � ENGINEERING INSPECTOR. [PHONE: (425) 771j-0220 EXT. 329] REMOVE AND REPLACE AS REQUIRED. JRR ENGINEERING SCALE: 1 10, DATE: 05/21/99 DRAWN: JES CHECKED: RKR FILE NAME: NICKOLSON/C-2DEMO /1\ 10/18/991 PER CITY REVIEW COMMENTS No. DATE I REVISION I DATE PREPARED: MAY 21, 1999 THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO AVOID EROSION/SEDIMENTATION DURING CONSTRUCTION. MATERIAL TO BE REMOVED FROM . THE SITE SHALL BE DISPOSED OF BY THE CONTRACTOR IN A MANNER CONSISTENT WITH STATE AND LOCAL REGULATIONS. UNLESS OTHERWISE AGREED, NO SEPARATE' PAYMENT -WILL BE ALI.OWED FOR REMOVAL OR DISPOSAL OF MATERIAL. ALL W)RK ASSOCIATED WITH THIS TASK SHALL BE CONSIDERED IN'JIDENTAL TO THE PROJECT. THIS PLAN SHEET IS NOT INTEN DED TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOR IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. STABILIZATION OF EXPOSED AMC. ALL SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE STABILIZED BY SUITABLE APPLICATION OF BMP's, INCLUDING, BUT NOT LIMITED TC, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMP's SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANC- WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDIN"7" TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED :'OR MORE THAN TWO (2) DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO AORE THAN SEVEN (7) DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 1.Schedule and attend Pre—collstruction meeting w/City of Edmonds. Call one —call at 1-800-424-5555 2.Provide construction staking for limits of clearing, line and grade of proposed utilities and miscellaneous struotures as shown on the approved construction plans. 3.Install temporary erosion anc sedimentation control (TESC) measures as shown on these plans and required by the City. 4.Sawcut, remove and dispose of pavement from areas to receive landscape, building, or' other improvementg. 5.Clear, grub and haul matericl from the site and dispose of as required. 6.Rough grade for proposed a.-cess construction, drainage improvements, and utility alignments. 7.Construct improvements as shown on the approved plans (drainage, utilities, paving, etc.). 8.Perform final grading, cleanjp and applicaflon of ground cover. 9.Remove TESC measur( R 25' MIN.--1 4"-8" QUARRY SPALLS 12" MIN. THICKNESS AS REQUIRED 100' MIN. EXCEPT MAY BE REDUCED TO 50' MIN. FOR SITES WITH LESS THAN 1 ACRE OF EXPOSED SOIL. 16 PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA NOT TO SCALE . FZAP 11 A, M cat rc -2 7 2 00 0 CITY ENGINEER SHEET TITLE: DEMOLITION & TESC PLAN THE NICKOLSON OWNER: OFFICE BUILDING BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 (425) 771-8475 SHEET C — 2 OF 7 SHEETS JOB NUMBER: 99-36 ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering 16030 52ND Ave. W., Edmonds, WA. 98026 (425) 787-6020, FAX 742-5221 RKR APP'D WENT NO.: 99-36 NO) R# 3 E, W.M. FIRE HYDRANT--\,,,\ GENERAL A PORTION OF SEC. 23, TWN. 27 VVA I tt< VALVE-\ THIS PLAN SHEET IS NOT INTENDED TO SHOW ALL ITEMS TO BE ID ONTRACTOR IS DIRECTED TO REVIEW ALL CONSTRUCTED. THE C ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, AND DRAINAGE SYSTEM INFORM ATI THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. CONTRACTOR IS CAUTIONED THAT POTENTIAL CONFLICTS WITH EXISTING UNDERGROUND UTILITIES AND STRUCTURES EXIST. PROPOSED CATCH BASIN LOCATIONS ARE PROVIDED BASED ON AVAILABLE INFORMATION MAY REQUIRE MINOR ADJUSTMENTS. CONTRACTOR SHALL NOTIFY EXIST. SS C.O. AND OWNER OF CONFLICTS ENCOUNTERED. DETENTION SYSTEM, CATCH STA. 5 + 21.9 RIM EL. 110.23 BASINS, FRAMES, GRATES, MATERIALS AND INSTALLATION METHODS SHALL COMPLY WITH CITY OF EDMONDS DESIGN AND CONSTRUCTION W S IE 103.63 STANDARDS. CATCH BASIN #1 (TYPE 1) CATCH BASIN #3 (TYPE 2) RIM EL. 110.50 RIM EL. 111.60 W IE 106.99, 8" CPEP W IE 107.51, 24" CMP E IE 106.99, 8- CPEP E IE 108.71, 6- PVC CATCH BASIN #2 (TYPE 2) CONNECT DOWNSPOUTS & 30'(1/2 ROW) EL. 110.35 SCALE: 1 10, 8110 CMP BEGIN ALLEY GUTTER, RIM EL. 110.44 FOOTING DRAINS AS REQUIRED. RISER MATCH EXISTING GRADE.------\ + S IE 107.22, 24" CMP E IE 107.22, 24" CMP EXISTING ROCKERY REMOVABLE WATERTIGHT COUPLING OR FLANGE-----__,_,_.__ TO REMAIN MATCH EXISTING GRAD�, -rM,AT,( EL. 116.981 INSTALL 44 LF OF ALLEY GUTTER, SEE UTILITY POLE T� ORIFICE REMAIN i I.E. 108.55 DETAIL ON THIS ,,/-EXISTING 4 T 130.00' A SHEET.+ DIRECT NEW SIDEWALK RUNOFF TO EXIST. 89'52'0 1 E :.4 W A. CB .4 4 U rMf%l n(ZHOP 4 4 �L �4 LA "Xl" REDUCER 01 3/4p 4 16" MAX.1 I I Mi VALV E :4 GAT EXIST. CB (TYPE 1) .4 14. LATE 8 L 0! 3/4" TYPE V. RESTRICTOR P W/ I- --Mir ICE .5tuo RIM EL. 109.76 COPpER FROM LANDSCA 'E .09 v 4N EXISTING METER SHARP -EDGED RAISE TO 110 V) 4/ 0 26 6" CP U) SLAB SHOP DRILLED SW IE 108. FF EL. 112.19 IRRIGATIO ] I / ... . . I 6" SP UDED CONCRETE CURB SYSTEM''O 4.' N IE 108.26 EX 4: 44 NW IE 10836 6" SP SEE It, SHT. C- BE DESIC NED S ELBOW RESTRICTOR BY OTH E . ...... RAISE FRAME & GRATE INSTALL (1) 4" RISER SECT. 14 LF 3"0' NSTAL DOUBL' NOT TO SCALE (TYPE 1) SCH 0 P �A EXIST. CB ( .0 11 G 5/8X3/4 4.. 8.51 -CHEC� VALVE EXISTIN ET U RIM EL. 109.68 4' ER METER TO RQMAIN > TYP 00 ASSEN LY PER C WAT 4. .9V AS LANDSCAPE METI SE IE 108.48 F E[ M NDS n 0 A�- F) n FT; .0 OVERFLOW ELEV. TO LL 5TAN E PROVIDE DETENTION BENCH MARK r- I -i . + INSTALL NEW DRIVEI�AY- 0 cn W Lr) 0 A AND OIL SEPARATION 1'- 0" MIN. (D ELEVATION = 110.U6 n W 14' WIDE THROAT ELEV. 110.35 r PK NAIL IN ACP #3 27 LF 6"PVC CENTERED ON FIR NTAGE 4+' Z' OF PROPERTY. SEE, DETAIL> A' -�1�57 LF 24 CMP 5% M on I .. ­ . . PIPE SUPPORTS: > S=2% MIN. ON SHEET C-6. F , W X. 3N.090 GAGE Uj 0 4 0- U) S=.005 N w 4 17 4z U) CB#2 a 21' LINE EL. APPROX. .7 BOLTED OR IMBEDDED 12 LF TRENCH 0. v 2" IN WALL AT MAX. Pas g 0 '00 ND L) S F­ c- t4 vq RK Pi c!) 12: DRAIN SEE ��L 0 * 4 �7' 3' SPACING, MINIMUM U- 0 'FF-Sr 6OUERl- t4 4 4 S F 4 L\F24 0 5t �A�VF- L.F-!!�§ r-QA THIS SHEET. 4 OF TWO SUPPORTS 4>� C14 ! 1 L, 5' V) 0 U R ELBOW RESTRICTOR C14 E­­1 00 SEE DETAIL ABOVE. STA 3+35-0. IE 102,3± LO L. 10-19 8' 1 4L 4 INSTALL 6" TAP ON SEWER '0 CMP MAIN PER CITY OF EDMONDS 8"0 CMP CONCRETE CURB : 4 TYPICAL SIDE SEWER DETAIL. S,'=0.005 4. 4 - GUTTER LOBBY SEE SHT. 4 51, . : 0 20 L, YO FF EL. 112.19 Ni N SCH -P,O.C. c INVERT ELEV. 107.05 p 4'' -­0 -11 LF Al 1 LF 6% PVC S=. c Ebb .44 EE SHT. C-4 FOR C.O,#2 6 OMPLETE SE ER WATER, i -INSTALL 2" DOUBLE d 17-F INFORMATION 1811 4 4 414 A M \ 2 RA p. \1 - 1 .14 STRAP SERVICE 4 EXIST. CB (TYPE -A '4 GA $PC .4 4 STOP. SEE DETAIL 4 --LANDIb4 EL. 110 UZ 116 MID 7 SADDLE & CORP 11 RESTRICTOR PLATE F. 3 /4 RIM EL. 109.12 P 8LF 2 Q"0-/ 4 SHEET C-5 *V-r&+"0 ORIFICE NE IE 107.72, 6" C S=.005 CB#j LANDING �-7Lr `DR 7 40 SHARP EDGED S IE 106.90 8" CP C 4 L r- 19"0 CMP PE, S- D* R 7 -'t�UNDIN C. 130. BENnH MARKI SHOP DRILLED -P-89*52 00" E ROCKERY, HEIGHT W IE 106.9d, 8" CMP 005 005� 0' 2.0",90' ELEVATION =1 118.17 FT. RIES TO 3' MAX PK NAIL IN AjCP BE D 7 NN 2 N1b N MATCH EXISTING GRAD EL. 118.10 CONTRI INSTALL METER NOT TO SCALE 00 4'X6' OIL/WATER ASSEMBLY. SEE SEPARATOR, SEE SHT C-3 DETAIL SHEET C-5 15"0 DETENTION PIPE EXIST. CB (TYPE 1) WATER METER SD FOR PUD PROPERTY RIM EL. 109-91 to C CO N F i v4r--b j>I4-,C-HAF-c--F- IS TO N IE 106.81, 8 P FIELb 00,1SE-12-V %OM!5 cf;� IN ALLEY. I S IE 106. 81, 8:: CP E IE 106.91, 6 CP EXIST. CB (TYPE 1) A EXIST. CB (TYPE 1) RIM EL. 113.01 FT I ROW RIM EL. 112.37 FT W IE 108.91 W IE 108.37 9.8 9. 8 tiv 0 Anima a DRAINAGE PLAN Al ................. ........... SSMH (EXIqTING) STA. 0+00� RIM EL 11 1.35 N. IE. 100-100 2 9 - off ------ aft- o.05 FT -/FT' FT./FT. J> t> it -Opp NOTES: 1 FOR INTEGRAL POUR CONSTRUCTION, 1/4" EDGED GROOVE MAY REPLACE EXPANSION JOINT INT RFACE BETWEEN THE CURB AND ADJACENT DRIVEWAY. 2. AT CATCH BASIN PROVIDE 1 FOOT WIDTH OF SECTION SHOWN ON ALL SIDES. CEMENT CONCRETE AL a NOT TO SCALE I SCALE: 1 " = 10' JOINT CEMENT CONCRETE PAVEMENT DRIVEWAY, SEE PLAN. R=111 NEW PAVEMENT - DEPTH PER PLAN. NOT TO SCALE R=11.5" 6"0 (NOM.) ELBOW ALUMINUM ROD, 1/,,2" ROUND STOCK i7HANDLE TO BE 18 MAX. FROM RIM WITH GATE DOWN. SQUARE INSPECTION COVER MARKED "STORM" WITH LOCKING BOLTS, UNLESS OTHERWISE APPROVED BY CITY. . t, .. .4 MAX. W. - 110, 3.;- CLEANOUT SHEAR GATE. (PER WSDOT STD. B-3) 0 4 UTILITY VAULT COMPANY, MODEL # 660-SA SEPARATOR W 660-ST TOP SECTION AND 660-SB VAULT W� (2) 12" 660-LA RISERS & SLOPED LID To MATCH PROPOSED FINISH GRADE. TOP 111.3 SEE PLAN FOR INLET LUUAIIUN 5.2" SEE CONTROL 3.9 STRUCTURE DETAIL 39.37" SHEET THIS \"4.E. 107.05 IZ110 13 H 8" CMP, IE. 107.05 F#�bZICPTDP, TO CPkLV- Atr-TF-R r-hBRIC-6,1710H, ACO DRAIN 100 2 OILMATER 5,51EPARATOR DETAIL If- .- � Ark 4" PVC -J H Oimension K100-1 = 5.9" NOT TO SCALE ON& . 11� �j �P R Outlet K100-2 = 7.9" APr- K100-3 = 9.8" 3 --up-4 3.5- -a*-- A4 ACO POLYMER RODUCTS INC. rc 0 0 0 TRENCHDRAIN 800/543-4764� TOLL -FREE NOT TG SCALE C ENCAINEE14 JRR ENGINEERING SHEET TITLE: DING GRADING & OWNER: BRUCE NICKOLSO -ILL F09<71 Cp DRAINAGE PLAN 9829 CHERRY ST. -T) D r V 9- R zq-\ C-04T FOLL r =95 ITI f2K EDMONDS, WA 98020 0. 11-0 3&Ao -Dps;,�r\ rtucsiovx 4�r Ijy 11, N- -8475 SHEET SCALE: 10, /2 Lep JOB NUMBER: (425) 771 3 (oloa -P;P-,r ceji-a"i JRR Engineering C 3 DATE: 05/21/99, - RKR 99-36 ENGINEER: Ronald K. Riach, P.E., d.b.a [IF DRAWN: JES 10/18/99 PER CITY REVIEW COMMENTS JAPP'D CLIENT NO.: 16030 52ND Ave. W., Edmonds, WA. 98026 7 CHECKED: RKR N No. DATE REVISION 99-36 (425) 787-6020, FAX 742-5221 SHEETS FILE NAME: NICK,-/C-3DRAIN.DWG DATE PREPARED: MAY 21, 1999 A PORTION OF SEC. 23, TWN. 27 N.; R. 3 E. 2 W.M. z CS1 EXIST. SS C.O. STA. 5+21.9 RIM EL. 110.22 S IE 103.63 TRASH ENCLOSURE EXIST. CB (TYPE 1) RIM EL. 109.76- ... ... . ...... SW IE '108.26, 6" C P N IE 108.26 ' 6" SP NW IE 108-56, 6" SP--------"' EXIST. CB (TYPE 1) - RIM EL. 109.68 SE IE 108.48 BENCH MARK 0' ELEVATION = 110-06 PK NAIL IN ACP r n 0 STA 3+35.0. IE 102.3± Lo INSTALL 6" TAP ON SEWER MAIN PER CITY OF EDMONDS TYPICAL SIDE SEWER DETAIL. SEE SHT. C-5. 1� I EXIST. C13 (TYPE 1) RIM EL. 109.12 NE IE 107 72 ' 6" CP S IE 106.90, 8" CP 0 - IS co EXIST. CE3 (TYPE 1) RIM EL. 109.91$' N IE 106.81 8 CP S IE 106.81: 8" CP E IE 106,91, 6" CP X� FINISHED GRADE �WK 0 ID 130.00, 7 TE-N 89-52'01" E 4. 4 d. .4 T\ NSFORNER & VAU PER SLAB :1U REQUI REMENTS. I[NNLTALL FF EL. 112.19 BOLLA 7DS NS SHOWN (6 TOTAL) 1 LF 3"0 'SCH 0 P` 8.5' �3 PR POSED U Lo PARIKING W/ n V) 0 P BLDG ABOVE. .4 �E TR S U LL FF 112 OTAL) B. 5 P R P O� 5% 4% wgremom Iml n�j SSMH (EXISTING) STA. O+bO RIM EL 1114.35 N. IE. 1,00.00 COMPACTED � BACKFILL UNDISTURBED EARTH SD "-USE SPECI�L CARE IN PLACING BACKFiLL TO THIS POINT TO MINIMIZE ROCK/PIPE CONTACT. INSTALL COPPER WIRE WITH PIPE IF FUTURE LOCATING IS DESIRED. I OLYETHYLENE (PE), PVC OR COPPER PIPE. PIPE MATERIAL AND SIZE AS REQUIRED TO TO COMPL� W/ CODE. PE & PVC PIPE MUST NOT BE IN�TALLED UNDER ANY STRUCTURE OR MOBIL HOME TO COMPLY W/ UPC - /010 LOBBY LI 3"0 - FF EL. H. VC P.O.C. 1C 417-,f C.O.#� �j :.j4 GAT 2 A 14 .4 V ALVE, 81 F 9-0"0-1 LANDING P E S 1) IR 7 87 LF 2"o P� �LAND.11,NG/ EL. 116.1 ----j 30.D 2 2 1 -A' IS 89'bZ 00 E BE D EXIST. C8 (TYPE 1) RIM EL. 112.37 FT W IE 108.37 15"0 DLE-TENTION PIP FOR PUD PROPERTY r-ikile�l ir'r% f%DAME" ----116 30'(1/2 ROW) FIRE HYDRANT TER VALVE-\. EXISTING UTILITY POLE TO REMAIN SCALE: 1 "= 10' a Mye,:T N-v :.4 3/49X1" REDUC R COU.' LING & 1 4 GAT0- VALVE E 14. 8 LIt, 3/4' TYPE A 4 COPOER FROM 4 CA-NDSCAPE---' V- EXIONG METER IRRIGATION SYSTEM TO A� . BE DESIGNED 4 A BY OTHERS 44 NSTAL DOUBIL CHECK VALVE EXISTING 5/8X3/4 4.. SSEM LY PER CIT� WATER METER TO IRE MAIN AS LANDSCAPE METER F ED NDS NDA D D V) .4 w 4- A V) 4 U-1 .4 41 .4 0 Cq 4>� L0 0 Qw 0 oCL CL, V) 00 q "�TE CURB CONCRIi 4. (,-UTTER 4 .4 4 'qd A F-6 Ik- 4- JIN:$TALL 695 4 C-Iry or L lvALU -6% ..A 1 Eb CA 6M INSTALL 2" DOU13LE k)(4 4- 4. P-j- L2 Ak., STRAP SERVICE '4 /SADDLE & CORP BY (-ITY 4 ----E- 11 576'2� 1161 STOP. SEE DETAIL \SDR 7 1 40 LF TYPE K COPPER SHEET C-5 ROCKERY, HEIGHT \1�7VARIES TO 3' MA 71 z N "N� N I e1A INSTA 2" R ASSEMBLY. SEE DETAIL SHEET C-5 EXIST. CB (TYPE 1) RIM EL. 113.01 FT \N IE 108.91 Z 16 A" A YELLOW PLASTIC INDICATOR TAPE MARKED "ELECTRICAL" COMPACTED BACKFILL UNDISTURBED EARTH SAND BEDDING MATERIAL SCH 40 PVC OR DIRECT BURIAL CABLE ADDITIONAL AS REQUIRED I SECTION IBENCH MARK EL PK NAIL IN /,CP I�W R METER Secondary Distribution Trench With Joint Utilities Fhal Grade f Conductor 24!' Min. 36' Max Water/ 36" Sewer 127 Min. � �- �i -�a ; 1-0. Telephone Natural Gas: Staked or Shaded vvith backfin every 101 as required to maintain separation. JRR ENGINEERING SCALE: 1 to = 10, -[-- DATE: 05/21/99 Mo/ro Per YP- U � P,- - e- V-1 vv%.-e 14- --; - DRAWN: JES 16/18/9'a PER CITY REVIEW COMMENTS CHECKED: RKR No. REVISION FILE NAME: NICKOLSON/C-lS&W.DWG I DATE PREPARED: MAY 21, 1999 THIS PLAN SHEET IS NOT INTEND D * TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOF IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTURAL, ELE ' CTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. CONTRACTOR IS CAUTIONED THAT POTENTIAL CONFLICTS WITH EXISTING UNDERGROUND UTILITIES AND STRUCTURES EXIST. PROPOSED SEWER ACCESS POINTS (MANHOLES) AND WATER LINE ANGLE POINT LOCATIONS ARE PROVIDED BASED ON AVAILABLE INFORMATION AND MAY REQUIRE AINOR ADJUSTMENTS. CONTRACTOR SHALL NOTIFY OWNER OF CONFLICTS ENCOUNTERED. ALL SEWER AND WATER IMPROVEMENTS SHALL COMPLY WITH CITY OF ED ONDS DESIGN AND CONSTRUCTION STANDARDS. UNLESS OTHERWISE INDICATED, Al SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) SDR 35, WITH RING TITE JOINTS. WATER SERVICE PIPE SHALL BE COPPER, TYPE K OR POLYETHYLENE (PE) SDR-7-:)E 3408, AND SHALL CONFORM TO ASTM D2239-81. PRESSURE REDUCING VALVES MAr BE REQUIRED TO COMPLY WITH MAXIMUM PRESSURES ALLOWED BY THE UNIFORM PLUMBING CODE. C.O. #11, 6"0 RIM EL. 110.60 IE 105.60 C.O. #2, 6"0 RIM EL. 112.15 IE 109.65 I 6"(T-YP) (TYP) 01 0 0 0 0 EXIST GROUND I lur VILVV RESILIENT SEATED SHUTOFF TEST COCKS VALVES (2 REO'D) 3- (TYP) (4 REO-D) 0 J: 2 UNIONS REO'D PLASTIC OR CEMENT METER BOX to --- >77 SIDE VIEW GRAVEL (12 MIN) 1. APPROVED DOUBLE CHECK VALVE ASSEMBLY TO LAY HORIZONTAL WITH 2. DESIGNED FOR BACK SIPHONAG-- AND BACK PRESSURE. 3. TEXT COCKS TO EITHER FACE OUTWARDS OR UPWARDS FROM ASSEMBLY. 4. ALL TEXT COCKS MUST BE PRCVIDED WITH PVC PLUGS OR EQUAL. 5. THOROUGHLY FLUSH LINES PRIOR TO INTALLATION OF BACKFLOW PREVENTER. 6. THE DCVA CAN BE INSTALLED /BOVE OR BELOW THE GROUND PROVIDED ALL CLEARANCES ARE MET. 7. DO NOT INSTALL IN AN AREA SJBJECT TO FLOODING. 8. MUST BE PROTECTED FROM FR,,EZING CONDITIONS. VED MODEL. 9. THE 13ACKFLOW PREVENTION AS3EMBLY MUST BE A WASHINGTON STATE APPRO MUST BE TESTED AFTER INSIALLATION AND YEARLY THEREAFTER! BY A WASHINGTON STATE CERTIFIED BACKFLOW ASSEMBLY TESTER, THE TEST REPORT MUST BE SENT TO THE CITY OF EDMONDS WATER DIVISION R E\,'I S 10 N S STANDARD DETAIL_ I: R-MMBLY (STANDARD D.C.U.'X'AND SMALLER) I SCALE .�, DATE 1 /400 DWG NO. "U90-199u 1 1 1 VIAPIF ron i WN Vt U00 CITY ENGINEER SHEET TlTil: THE NICKOLSON OFFICE BUILDING SEWER & WATER OWNER: BRUCE NICKOLSON IMPROVEMENTS 9829 CHERRY ST. EDMONDS, WA 98020 SHEET (425) 771-8475 JOB NUMBER: 99-36 ENGINEER: C - 4 OF Ronald K. Riach, P.E., d.b.a. JRR Engineering RKIR 16030 52ND Ave. W., Edmonds, WA. 98026 7 APP'D CUENT NO.: (425) 787-6020, FAX 742-5221 99-36 -SHEETS NOT TO 2 (FOR FUTURE DEVELOPMENT) PLACE 2X4 AT END OF SIDE SEWER STUB AND CUT TO LENGTH TO INSURE 3 FEET EXTENDS ABOVE GRADE. PAINT TOP 18 INCHES WHITE. IN 3 INCH HIGH LETTERS STENCIL THE NUMBER OF EVEN FEET FROM GROUND ELEVATION TO THE SEWER STUB INVERT. 8 GAUGE WIRE TO BE DOUBLE WRAPPED AROUND PIPE AND 2X4 - LAMPHOLE COVER TO BE PLACED AT FINISHED GRADE (SEE STD SEWER CLEANOUT DETAIL) 6" WYE AND 45* BEND 6" LATERAL SEWER LINE PE- 2% MIN. TO 50% MAX y RUBBER JOINT BISCUIT PLUG OR OTHER APPROVED WATERIGHT PLUG NOTE: AN INSERTA-TEE SHALL [EBE USED. 22.5* OR 1. WHEN TAPPING INTO EXISTING MAIN PLACEMENT OF TEE SHA. L DEPEND 45* BEND ON DEPTH OF SEWER MAIN. AS A MINIMUM, THE TEE SHALL BE PLACED AT A 45 DEGREE ANGLE� 2. IF CONNECTING SIDE SEWER TO EXIST CONCRETE LATERAL, A CONCRETE/PVC ADAPTER SHALL BE USED AND SECURED PER MFGR'S INSTRUCTIONS. I EDM,ONDS STANDARD DETAIL TYPICAL SIDE SEWER FINISHED GRADE SEAL SAWCUT JOINTS W/ AR-400OW TO SCALE .0 0,19 MENT REPAIR NOT TO SCALE TRENCH EDGES MUSI BE SAW -CUT AND TACKED PRIOR TO FINAL TRENCH PATCH 6" MIN DEPI 5/8" CSTC U- LO �7_ cn z ui cc wM !� D V) a. M M g 0 C-) 0 LjLj z 0 REFER TO SPECI 11TIONS ui FOR TYPES OF PIP9 CL (L E C) o'09 IP 6" TEE POSSIBLE SEWER MAIN LOCATION POSSIBLE SEWER MAIN LOCATION WHERE TRENCHING THROUGH EXISTING ACP IS REQUIRED, MATCH EXISTING ASPHALT DEPTH OR 3" MIN., PROVIDE 6" COMPACTED DEPTH OF CRUSHED SURFACING TOP COURSE BELOW. MAX TRENCH PATCH PAY WI DTH (SEE TABLE BELOW) ------------------ ------------------ ------------------ R TO CITY OF EDMONDS MODIFICATION TO THE )ARD SPECIFICATIONS FOR TYPE AND GRADATION. TABLE 1: MAX TRENCH PATCH PAY WIDTH TRENCH DEPTH PAY WI DTH 3" MIN DEPTH CL 'B' AC TRENCH PATCH BACKFILL MATERIAL (SEE NOTE BELOW) u-se- C_bF wHEN 4�� PIPE- 6-0\JEP- IS LF-5-S "FH A N 1 '-4p 40" 4'- 10' 60" 10'-20' 72" DMONDS STANDARD DETAIL NOT TO SCALE NOT TO CLEAN uj z ZI RESIDENCE 0 CLEANOUT WITH 45* COL: BENDAND CAP CLEANOUT (WYE WITH CAP AND LAMPHOLE COVER) 12"+/- WATER TIGHT CAP RISER 4" OR 6" SIDE SEWER GENERAL CLEANOUT DETAIL 12- ASPHALT SURFACE LAMPHOL 12" PV( SLEEVE 601 RI! 6" WYE AND 45* AND 1/8 BENC 4" OR 6" SIDE SEWE CLEAN OUT DETAIL AT PROP z < Lu V) C-ITY 1MS-FAt_L_F_b tN5TA M ER BOX & LID, 3 PIECE BALL ANGEL METER VALVE W/DROP IN C.I. READER LID. 8" TOP SECTION, 10" BOTTOM SECTION INSTALL METER BOX BROOKS 65 4" BEHIND CURB OR SIDEWALK FINISHED STREET :011 CURB GRADE CHECK VALVE 12" F3 METER 30" 36" �Iuvr_r% 2-90' ELBOWS 2" COMPRESSION X 2X2.5 RLPf ttTft F.I.P.T. COUPLING eewfq:E 0 1 (MUELLER CAT. NO. H-15454 OR APPROVED EQUAL) -2-T 10 COPPER TUBING TYP INSTALL 15" METER YOKE CAT. (MUELLER NO. B2422-2 'ORPORATION STOP - 2-5r' PE SERVICE ITEM #660-999 OR APPROVED kWWA INLET x I.P. OUTLET LINE TO BLDG. EQUAL) )ONES J-45 METER LAYING LENGTHS: WATER MAIN 1-1/2" = 13" 2" = 17" PLUS 1/2" FOR GASKETS SER VICE SADDLE DOUBLE STRAP ROCKWELL TYPE 313 STUB to STANDARD 2 WAT R SERVICE T TO SCALE LINE LAMPHOLE COVER (OLYMPIC FOUNDRY CO 6" RISER MODEL 5931 OR EQUAL 12" PV"-�SLEEVE PVC CAP NOTE: SIDE SEWER JOINTS SHALL BE t GASKETED TYPICAL C - NOUT UNDER ASPHALT OR CONCRETE EDMONDS STANDARD D ETAI L SEWER CLEANOUT DETAILS NOT TO SCALE LIMIT OF PIPE ZOI"f_ IMPORTED MATERIAL REQUIRED PER SPECIFICATIONS AND TYPE OF PIPE FOUNDATION LEVEI IPE BASE Kp NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES 3. COMPACT BEDDING MATERIAL TO 95% MAX DENSITY EDMONDS STANDARD DETAIL PIPE BEDDING NOT TO SCALE JRR ENGINEERING SCALE: AS NOTED DATE: 05/21/99 &\ 31QYloo c b I= -6 A c K F I L L_ P e E, e- IT Y 6 0 M DRAWN: JES PEF , 0TY Revievi eomj-jet,(I-� CHECKED: RKR No. DATE REVISION FILE NAME: CURR-/NICKOLSON/C-5 DATE PREPARED: MAY 21, 1999 cn V) �1 z D w Lu >0 0 PIN" M" V) z D 9 to a C<L M 0 T E CH EDGES MUST BE AW-CUT AND TACKED PRIOR TO FIN %L TRENCH PATCH 40" MAX. TF ENCH CL "B" ASPHALT TRENCH PATCH fwef+_f;kA%f..4 vlr%.ri 1 (2" MIN DEPTH -COLLECTOR STREETS) ,,—(3l' MIN DEPTH -MAIN MATERIALS) MIN 5/8- CSTC SEE SPECFICATIONS FOR BACKFILL MATERIALS GRADATION SEE SPECIFICATIONS FOR DOMESTIC SERVICE AND A.R.V. CONNECTION DETAILS 45 1/4 PIPE O.D. MIN. 4'w MIN 4. __A PIPE BASE SHALL BE REQUIRED ONLY AS DIRECTED BY THE ENGINEER. SEE SPECIFICATIONS FOR PIPE BASE CIl.ASS 52 DUCTICLE IRON PIPE MATERIAL GRADATION. UNLESS SPECIFIED OTHERWISE A� TYPICAI NOT TO SCALE SHEET TITLE: SEWER & WATER DETAILS JOB NUMBER: 99-36 5?kR CLIENT NO.: APP'D 99-36 LINE T�ENCH SECTION U JON NEM _`KOLSON OFFICE BUILDING THE NIC OWNER: BRUCE NICKOLSON 9829 CHGERRY ST. EDMONDS, WA 98020 (425) 771- 8475 SHEET ENGINEER: Ronald K. Riach, P.E., cl.b.a. JRR Engineering C-5 OF 16030 52ND Ave. W., Edmonds, WA. 98026 (425) 787-6020, FAX 742-5221 7 SHEETS 10112,30.2 1", Lei \7 4 ': d.' 4" MIN. 'd -d TRENCH WIDTH EXISTING OR /-NEW UTILITY CEMENT CONC. CLASS 2000 PIPE UNDISTURB EARTH UTILITY 12" CROSSING MIN�- M I NOTES: 1. CONTRACTOR SHALL PROVIDE CONCRETE PIPE ENCASEMENT WHERE NECESSARY TO TO PROTECT EXISTING UTILITI�S IN THE EVENT THAT A 6" SEPARATION CANNOT BE PROVIDED. CONTRACTOR SHALL BECOME FAMILIAR WITH THE DRAWING TO ANTICIPATE CONFLICTS AND PROVIDE AND INSTALL CONCRETE ENCASEMENT WHERE NECESSARY. I NOT TO SCALE NOT TO SCALE 2" COMPACTED DEPTH CLASS "B" ACP 4" COMPACTED DEPTH, CRUSHED SURFACING, TOP COURSE (CSTC) 6" COMPACTED DEPTH GRAVEL BORROW OR EXISTING MATERIAL, AS DETERMINED BY ON -SITE GEOTECHNICAL ENGINEER. REMOVE DELETERIOUS MATERIAL AND COMPACT AS REQUIRED TO ACHIEVE 95% OF MAXIMUM DRY DENSITY BY ASTM D-1557 (MODIFIED PROCTOR) ,NY. INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR EXPANSION JOINT DUMMY JOINT -4 4 4 4.1 4 14 .4 10, O.C. 5' O.0 5' TO 7' .. A. 7 COMPACTED NATIVE MATERIAL UNLESS OTHERWISE SP�CIFIED BY ENGINEER FULL DEPTH 1/2' EXPANSION JOINT MATERIAL NOTES: 1. CONCRETE SHALL BE CLASS 3- 300OPSI 2. CONCRETE SHALL BE BROOM FINISHED 3. SIDEWALK THICKNESS SHALL BE 5-1/2" AND 6" THICK AT DRIVEWAYS 4. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK 5. CONCRETE SHALL BE SPRAYED WITH CLEAR CURING COMMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS. EDMONDS STANDARD DETAIL CONCRETE SIDEWALK DETAIL NOT TO SCALE F. RESIDENTIAL — 10'-0" MIN. 20'-0" MAX. COMM./INDUSTR. 25'-0" MIN. 35'-0" MAX. 6- VARIES 0.0 M 2- FT./FT. AX- 3 O.01LH_-/_F.T. MAX. RIGHT-OF-WAY LINE CEMENT CONCRETE MATCH EXISTING DRIVEWAY 5" THICK DRIVEWA( GRADE SECTION A- K. WAS 9 01 '9 TSS $ 110 sh EXPIRES: 10-25-2001 NOT TO SCALE JRR ENGINEERING RIGHT-OF-WAY LINE Y r8 ;;,* �pjv CURB TAPER 0. SIDEWALK PLANTING STRIP, IF ANY NOTES: 1 . A REVERSE SLOPE DRIVEWAY IS SUBJECT TO APPROVAL BY ENGINEER CONSIDERING NEED FOR AND COMPATIBILITY OF THIS FEATURE. 2. COMMERCIAL/INDUSTRIAL DRIVEWAYS WIDER THAN 35' MAY BE APPROVED CONSIDERING TRAFFIC SAFETY AND NEEDS OF THE ACTIVITY SERVED. ALL COMM ERCIAL/IN DUSTRIAL DRIVEWAYS SHALL HAVE AN EXPANSION JOINT LOCATED MID -WIDTH. SEE SEC. 3.04. 3. A STORM SEWER INLET SHALL BE LOCATED WITHIN 20' BUT NO CLOSER THAN 10' UPGRADE FROM NEAREST EDGE OF CURB TAPER. 4. SEE SEC. 3.01. 5. SEE SEC. 4.01 FOR SURFACING REQUIREMENTS. ROUND TO RECTANGU R OR REDUCER COUPLER TO CONNECT TO DOWNSPOUTS. FINISHED GRADE SHEET TITLE: TYPICAL DETAILS 4" ADS RISER LENGTH AS REQUIRED 4" ADS TO 4" PVC ADAPTER COU 4" PVC I =LING.- 4" PVC PIPE-+—, NOT TO GROUT FRAME TO CATCH BAS SCALE: AS NOTED DATE: 05/21/99 JOB NUMBER: DRAWN: JES 10�18/99 PER CITY REVIEW COMMENTS RKR 99-36 -CHECKED: RKR No. D ATE I REVISION APP'D CLIENT NO.: FILE NAME: CURR--/NICKOLSON/C-6 DATE PREPARED: MAY 21, 1999 99-36 0 00 LL_ 10 01p a 0 uj _j 00 00 Z uj V) M 00 0C.0 C,00 0 0000 0 0 ('0 0 000 0 00 0 OE GROUT pq N P LAC E---f 4 MIN (TYP.) NOT TO SCALE BURIED FILT R FABRIC BLDG BY OTHERS "-4" PERF. PVC PIPE WITH MIN. 4" DEPTH 1 1/2- WASHED ROCK ABOVE AND BELOW. WRAP W/ FILTER FABRIC. UNDISTURBED EARTH FILTER FABRI /--DUCTILE IRON FRAME AND SLOTTED GRATE DEPRESSED X BELOW ELEV. SHOWN ON PLANS GRATES SHALL BE MARKED "DUMP NO WASTE DRAINS TO STREAM" — CONCRETE RISER — CORRUGATED HDPE WITH ,--SMOOTH INTERIOR UNLESS NOTED OTHERWISE. PRECAST CONCRETE CATCH BASIN TYPE I OR TYPE IL CONCRETE INLET AND TYPE 2 SIMILAR. FOUNDATION GRAVEL AS REQUIRED TO PROVIDE ADEQUATE SUPPORT. UNDISTURBED EARTH. CATCH BASIN INLET PROTECTION (TYP) NOT TO SCALE or �A If - - I = c; FOR .. a U!'X81" ION ?-c z -7 ze 0 0 MIGINEER THE N CKOLSON OFFICE BUILDING OWNER: BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 (425) 771— 8475 SHEET ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering C-6 16030 52ND Ave. W., Edmonds, WA. 98026 OF (425) 787-6020, FAX 742-5221 7 SHEETS A PORTION OF THE SE 1/4 OF SEC. 23, TWN. 27 Nt R. �3 E, W.M. GENERAL NOTES 1 All work and materials shall be in accordance with these Plans and Specifications, City Design & Construction Standards and Specifications and Washington State Department of Transportation 1998 Standard Specifications for Road, Bridge, and Municipal Construction - (WSDOT). 2. Prior to any site construction to incluce clearing/logging or grading the site/lot clearing limits shall be located and field identified. 3. All work within the site and City right-of-way (R.O.W.) shall be subject to the inspection of the City inspector or a designated re resentative. Prior to any site work, the Contractor shall contact the Engineering Division at ( 1125) 771-0220 to schedule a pre construction conference. Field changes (revisions) will require engineered as-builts be supplied prior to site approval. 4. The temporary erosion/sedimentation cpntrol measures shall be constructed prior to any grading or extensive land clearing in accordance with the approved temporary erosion/sedimentation control plan. The Contractor is responsible to satisfactorily maintain these facilities until construction and andscaping is complete and the potential for on -site erosion has passed. 5. Trench backfill of new utilities and sto m drainage facilities shall be compacted to the percentage of maximum density (modfied proctor) as indicated on these plans. 6. Noncompliance with erosion control recuirements, water quality requirements, or clearing limits may result in violations and/or revocation of project permits, plan approval, and bond foreclosures. STORM DRAINAGE NOTES 1. Unless otherwise noted, all storm drainage (SD) pipe shall be corrugated high density polyethylene pipe (CPEP) with smooth interior. CPEP shall be ADS N-12 or Hancor Hi-q or equal as approved by the city prior to construction. Where other pipe is indicated, it shall be concrete pipe (CP) nonreinforced,. M C-14 (24" diameter and larger to be reinforced ASTM C-76), or corrugated metal pi CMP to be galvanized steel with treatment 1 asphalt coating or better. All CP and CMP s all have rubber gaskets. Minimum coverage requirements for pipe shall be per manufacturer's requirements. 2. All pipe shall be placed on stable eart I h, or if the existing foundation is unsatisfactory, the Contractor shall over excavate and ba I ckfill with a gravel material as necessary to support the pipe. 3. Pipe backfill shall be placed equally on I both sides of the pipe or pipe -arch in layers with a loose average depth of 6", maximu depth 8", thoroughly tamping each layer. These compacted layers must extend for one diameter on each side of the pipe or to the side of the trench. Materials to complete the filli over pipe shall. be as shown on the plans and indicated in these and the referenced specifications. 4. All grates (inlet and catch basin) shall be depressed 0.1 feet below pavement level. 5. All catch basins shall conform to WSDOT Standard Type 1. unless otherwise noted. 6. The Contractor shall be responsib,le for adju*sting all manhole, inlet, and catch basin frames and grates just prior to pouring of c, rbs and paving. 7. All catch basins with a depth over 5.0 feet to the flow line shall be a Type 2 CB. 8. All catch basins shall h1ave lock%ig lids. 9. Standard ladder steps shall be provide in all catch basins/manholes exceeding 5 feet in depth. 10. Catch basins shall have standard cast iron frame and grates and shall be Olympic Foundry or approved equal. 11. All storm drain work must be staked for line and grade prior to starting construction. 12. Storm drainage stub outs shall be marked with a 2x4 and labeled "STORM." Locations of these installations shall be placed on the Record Drawings and submitted to the City. 13. Storm water retention/detention facilities, storm drainage pipe and catch basins shall be flushed and cleaned prior to City of Edmonds acceptance. 14. Prior to any site work pertaining to di I "inage, the Contractor shall contact the City of Edmonds to schedule an inspection. 15. The drainage system shall be installed in accordance with the approved plan. 16. One set of approved drainage plans shall be on -site at all times for drainage inspection. 17. No part of the drainage system shall be covered, concealed, or put into use until it has been tested, inspected, and accepted by t e City. 18. Stencil storm drain grates with 'I DUMP NO WASTE, DRAINS TO STREAM". SITE GRADING AND T.E.S.C.P. �OTES 1 . All site work must comply to Appendix 33 of the Uniform Building Code. (1997 edition). 1 2. The Temporary Erosion and Sedimenta�,un Control System shall be installed and inspected by the Public Works Inspector prior to all other construction. 3. If cut and fill slopes exceed a maximum of two feet horizontal to one foot vertical, a rock or concrete retaining wall may be required. All rock retaining walls greater than four (4) feet in height are to follow City specifications and to be designed and certified by a Civil Engineer experienced in soils mechanics. 1 4. As construction progresses and seasonal conditions dictate, the erosion control facilities shall be maintained and/or altered as req ired by the City Engineer to ensure continuing erosion/sedimentation control. 5. Temporary siltation ponds and all temporary siltation controls shall be maintained in a satisfactory condition until such time that clearing and/or construction is completed, permanent drainage facilities are operational, and the potential for erosion has passed. 6. All disturbed land areas shall be stabiized as required by the City of Edmonds. See sheet C-2 7. Where possible, natural vegetation will be maintained for silt control. 8. Stockpiles are to be located in safe areas and adequately protected by temporary seeding and mulching. HYDROSEED preferred. I 9. The public ROW shall be kept clean. in work stoppage. ITracking of mud and/or debris from the site will result TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 1. INSTALLATION: The area of the entrance should be cleared of all vegetation, roots, and other objectionable material. The gravel shall be placed to the specified dimensions. Any drainage facilities required because of washing should be constructed according to specifications in the plan. If wash racks are used, they should be installed according to manufacturer's specifications. 2. AGGREGATE: 4" to 6" crushed rock, quarry spall. 3. ENTRANCE DIMENSIONS: The aggregate layer must be at least 6 inches thick. It must extend the full width of the vehicular ingress and egress area. The length of the entrance must be at least 20 feet. 4. WASHING: If conditions on the site are such that most of the mud is not removed from vehicle tires by contact with the gravel, then the tires must be washed before vehicles enter a public road. Wash water must be carried away from the entrance to a settling area to remove sediment. A wash rock may also be used to make washing more convenient and effective. 5. MAINTENANCE: The entrance shall be maintained in a condition ' which will prevent tracking or flow of mud onto public rights -of -way. This may require perliodic top dressing with 2-inch stone, as conditions demand, and repair and/or cleaning of any structures used to trap sediment. All materials spilled, dropped, washed or tracked from vehicles onto roadway or into storm drains must be removed immediately. HYDROSEEDING GENERAL NOTES 1. CONSTRUCTION ACCEPTANCE: Will be subject to a well established ground cover which fulfills the requirement of the approved construction plans and these specifications. 2. All seeded areas shall be protected from trespass and trampling by erecting temporary fences, barriers, signs, and the like as required. Do not work in, over, or adjacent to seeded areas without proper protection and safeguards. Seeded areas shall be kept moist until well - established, and showing a vigorous, uniform stand of gross. 3. All disturbed surfaces within the site, or affected R.O.W., not otherwise covered by buildings, asphalt, gravel, concrete, mulch, or other plant material/landscape items as indicated on Plans shall be hydroseeded. Hydroseeding shall be in accordance with these plans and requirements of the City of Edmonds. Install seed, fertilizer, and mulch for hydroseed mix at the following application rates: Seed: 4 pounds per thousand square feet. Fertilizer: 12 pounds per thousand square feet. Mulch: 60 pounds per thousand square feet. Jute or excelsior matting shall be placed on all regraded slopes steeper than 2 1/2:1. regardless of whether slope is seeded or planted. 4. PREPARATION OF SURFACE: All areas to be seeded shall be cultivated to the satisfaction of the City Inspector. This may be accomplished by discing, raking, harrowing or other acceptable means. EXCAVA,i"10.11, GRADING, AND FILL 1. Excavation, fill, and grading shall conform to the 1998 WSDOT Standard SpecilcoUlons, UBC Appendix 33, 1997 edition, and City requirements. Work shall proceed to the finished surfaces at the elevations and contours shown on the drawings. 2. Approximate locations of existing utilities have been obtained from available records and are shown for convenience. The Contractor shall be responsible for verification of locations and to avoid damage to any additional utilities not shown. If conflicts with existing utilities arise during construction, the Contractor shall notify the Engineer and any changes required shall be approved by the Engineer prior to commencement of related construction on the project. 3. Materials excavated in areas requiring cut grading may be used as fill if they meet the requirements for fill material outlined below. No boulders, concrete or asphalt chunks greater than 4" in its largest dimension may be used. Such material shall be disposed of off -site. 4. After clearing & grubbing is complete, the ground surface shall be prepared as fcllows: a. All areas to be surfaced with pavement, concrete, walks or steps, and building slabs shall have the top 12" of existing soils stripped and recompacted to at least 95% of the maximum density determined by ASTM D-1557 (Modified Proctor). b. Prior to recompaction of the stripped material all areas shall be proof rolled in the presence of the geotechnical engineer of the Owner's choice. Any areas deemed unsuitable by the geotechnical engineer shall be overexcavated and replaced with compacted fill material at an agreed unit price based on truck measure of replacement fill. 5. Imported fill shall be free -draining granular material without organics, and shall conform to WSDOT Section 9-03.10 for Gravel Base, 9-03.14 for Gravel Borrow, or alternate material approved by the Engineer in writing prior to its use. Fill shall have no more than 5% passing the, #200 sieve. 6. Submit samples of proposed fill material for testing for the determination of the optimum moisture - density relationship per ASTM D-1557 (Modified Proctor), pHor to any filling or overexcavation and replacement. 7. Place fill in 10" thick maximum lifts (loose) and compact to 95% of the maximum dry density per ASTM D-1557 (Modified Proctor). 8. Compact all fill using suitable compaction equipment. 9. Add moisture to the soils or scarify to dry soils as necessary to achieve specified compaction. 10. Contractor is responsible for soil and compaction testing in conformance with these specifications. 11. Soils may also be tested by Owner. 12. Contractor shall strip and re -compact all soils not meeting specified compaction at no additional cost to Owner. 13. For placement of ballast, gravel base, and/or crushed surfacing beneath Asphalt Concrete Paving (ACP), refer to the typical pavement section sheet C-6. MAINTENANCE OF SILTATION BARRIERS I 1. Siltation Barriers shall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Close attention shall be paid to the repair of damaged bales, end runs and undercuttingl beneath bales. Necessary repairs to barriers or replacement of bales shall be accomplished promptly. Sediment deposits should be removed after each rainfall. They must be removed1when the level of deposition reaches approximately one-half the height of the barrier. Any sediment deposits remaining in place after the straw bale barrier is no longer required sho 11 be dressed to conform to the existing grade, prepared and seeded. ASPHALT CO�CRETE PAVING 1. Materials and, workmanship shall conform to the 1998 WSDOT Standard Specifications. Contractor should possess and be familiar with these Standard Specifications. 2. Paving work shall consist of new Asphalt Concrete Pavement (ACP) as shown on the approved drawings. 3. All edges of existing ACP shall be sawcut to provide for neat joints with new asphalt or other surfaces where new grades meet existing. Removed asphalt chunks shall be disposed of off site in an approved manner, or broken into pieces with 4" maximum dimension and compacted within the fill greater than 6" below subgrade. 4. Class "B" As halt Concrete Pavement shall be furnished and placed in conformance with the materials, methods and tolerances of the WSDOT Standard Specifications Sections 5-04.1 through 5-04.3(21 . Final compacted depth of asphalt concrete pavement shall be a minimum of 2" or as shown on the approved plans. PAVEMENT MARKINGS 1. Point stripinc I shall be accomplished as indicated on the approved plans and details. 2. Unless other7ise noted, painted stripes shall be 4" in width. 3. Striping point shall be as listed in these specifications, or one of the following or an equal approved in I advance by the Owner. Sherwin -Will ams Pro -Mar Traffic Marking Paint White 829 W 1 i Yellow B29 Y 2 OR Preserva I tive Traffic Point OR Norton/Morris Application hall be in accordance with manufacturer's directions. 4. Paint stripes! for handicapped stalls shall conform with the current city and state barrier free code provisions and the City of Edmonds requirements. WATER DISIRIBUTION 1. All materialsishall be new and undamaged. Unless otherwise approved by the Engineer, the some manufacturer of each item shall be used throughout the work. Contractors shall furnish a watertightl plug of the appropriate size which shall be installed in the end of the water main anytime work is delayed or stopped. 2. All-weter-miain-distribution-piping-shajILbe--ductile-iron-pipe,cement-4ined,standard--tb-takness- No VJATF--P- Z _1a -ss- - 5 d-sholt_=nform to the Stari-d- ds of USA-Standard--A-21-.51-(AVT'i�iA-"C'-I-!51), and -rHis PRO'Tic-r, be installed in accordancqL.-witft--the-manuac"' i ini ic ess sholl-be-irf=:acuo--r.ddiFce--*w'- ith- USA -Sta ndo rd -A2-1-. -G-1 04).r 3-.2, No connection to the existing mains will be allowed except by means of an approved backflow prevention device prior to satisfactory flushing, testing, disinfection, and receipt of satisfactory bacteriological test results. "O� -4-.3, Taps on ex ting mains will be made by the _hGi4V­_4nspertionr- 5; q, All work and materials must conform to City of Edmonds Standards. -&.51 The City of Pdmonds Utility Inspector must be notified at least 24 hours prior to commencing construction. -7-G The Owner a r the Owner's authorized agent shall notify Utilities of a person who can be contacted regarding problems during construction on a 24 hour basis. SANITARY SEWER NOTESA 1. Sanitary sewer pipe to be PVC conforming with ASTM D-3034, SDR 35. Pipe bedding shall compl I with City of Edmonds requirements. Z' Adi-manholes,-sholl-have-a-.ia-feet--drop-between-4nver-t-4rr-and-4nvert-out-unless:�t-qo s5MH 1-141S l"r_0.TF_CT, etherwise-speeified-. -All- m an h a lee-sholl-have-iocking=rovers.-- 7�- 4:2, Side sewer I ocations to be verified in the field prior to construction. -All-new-n ioll-conform-to-eity-of-Edmonds , re uirements-. 6-.,3. All side sewers shall be capped with a water�ight plug and shall be marked for location with a 2"x 4" board, painted white, marked sewer" and noting the depth of the stub. I 10 gouge locator wire is required on all plastic pipe. -7-.,1. All testing a I d connec ions to existing mains shall be done in the presence of a representati e from the City of Edmonds. .&5. Sewers shall be pressure tested per City of Edmonds requirements. Tests will be at a minimum of : psi for 15 minutes. 9/. - 4he-eentreetler--shalHnstaii,---at--a3I Ito Innectione-to-existing-downstream--menholes,---Otms X- tG-pr-eyent4efeign-debri n-entering-existing--systemr--J-he-plug--eha"main-4n- -pleGe-unti"naHnspection-and-after-the-debilts-is-pumped-from-the--structu, e. +9-.6. All sewer pipe shall be placed on stable earth. Where the existing foundation is unsatisfactory it shall be excavated below grade and backfilled as required by %J the City of Edmonds. Sewer bedding shall be placed to proper grade and shall provide unyielding continuous support for the pipe. Z000 , Fw_ JRR ENGINEERING 4 9 SCALE: AS NOTED 18 TS f �6 '-tOIXAL 271, DATE: 05/21/99 DRAWN: JES EXPIRES: 10-25- CHECKED: RKR to_X9;_Z00\ I FILE NAME: CURR,-,/NICKOLSON/C-7 SHEET TITLE: SPECIFICATIONS I JOB NUMBER: Wishm ?r:-?, CrrY -P�vievi comrirur.5 P_ I<e 99-36 No. DATE REVISION APPD WENT NO.: I DATE PREPARED: MAY 21, 1999 99-36 0.. 1 "' CM ENGINEER— -- THE NICXOLSON OFFICE BUILDING OWNER: BRUCE NICKOLSON .9829 CHGERRY ST. EDMONDS, WA 98020 (425) 771- 8475 SHEET ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering C-7 16030 52ND Ave. W., Edmonds, WA. 98026 OF (425) 787-6020, FAX 742-5221 7 SHEETS ON OF SEC. 23, TWN. 27 N., R. 3 E-2 W.M. FIRE HYDRANT--\.,\ GENERAL NOTES: A PORTI WATER VALVE-\, ...... ..... THIS PLAN SHEET IS NOT INTENDED TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOR IS DIRECTED TO REVIEW ALL DRAINAGE SYSTEM INFORMATION ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. CONTRACTOR IS CAUTIONED THAT POTENTIAL CONFLICTS WITH EXISTING UNDERGROUND UTILITIES AND STRUCTURES EXIST. PROPOSED CATCH BASIN LOCATIONS ARE PROVIDED BASED ON AVAILABLE INFORMATION AND MAY REQUIRE MINOR ADJUSTMENTS. CONTRACTOR SHALL NOTIFY EXIST. SS C.O. OWNER OF CONFLICTS ENCOUNTERED. DETENTION SYSTEM, CATCH STA. 5+21.9 BASINS, FRAMES, GRATES, MATERIALS AND INSTALLATION METHODS RIM EL. 110.23 SHALL COMPLY WITH CITY OF EDMONDS DESIGN AND CONSTRUCTION S IE 103-63 STANDARDS. C CH BASIN #1 (TYPE 1) CATCH BASIN #3 (TYPE 2) AT RIM EL. 110.50 RIM EL. 111.60 W IE 106.99, 8" CPEP W IE 107.51, 24" CMP E IE 106.99, 8- CPEP E IE 108.71, 6" PVC 30' (11 /2 ROW) EL. 110.35 CATCH BASIN #2 (TYPE 2) CONNECT DOWNSPOUTS & BEGIN ALLEY GUTTER RIM EL. 110.44 FOOTING DRAINS AS REQUIRED. SCALE: 1 1 Of 8"0 cMP RISER MATCH EXISTING GRAbE.-----\ S IE 107.22, 24" CMP REMOVABLE WATERTIGHT E IE 107.22, 24" CMP EXISTING ROCKERY COUPLING OR FLANGE- 6"0 (NOM.) TO REMAIN -4-MATCH EXISTING GRAD�, EL. 116.981 I ELBOW JNZ�IMLL 'rr 1_* I ALLEY GUTTER, SEE ORIFICE U) /-EXISTING UTILITY POLE T REMAIN I.E. 108.55 DETAIL ON THIS 130.00, 4 . �y 4 SHEET. DIRECT 1 .0 /-NEW SIDEWALK RUNOFF TO EXIST. 89-52'01" 1 :.4. kz 41'. CB 47' . .<4 . _7T_ 7 .4 A LING & 1 4 4 C 0 Upi TRASH ENCLOSURE 4 3/4RX1" REDUCER 6" MAX] GATO,, VALVE EXIST. CB TYPE 1) 1.4 E 14 4 / .1 RIM EL. 1006- 8 L 3/4'- TYPE 4 RESTRICTOR PLATE 4. k COPr .09 g ER FROM A W/ 1.56"0 ORtME- RAISE TO 110 0) 9FI _D§C`A-ff__' 4 EXIS�TING METER SHARP -EDGED SW IE 108.26 6" CP (n SLAB IRRIGATIO 42. 4 N IE 108.26 6" SP DIED CONCRETE LCURB FF EL. 112.19 SHOP DRILLED EX U S�ST'EIM - '0 4. NW IE 108-56, 6" SP SEE 1, / .. RAISE FRAME & GRATE SHT. C- 5 BE DESI(NED 4 4 4o- 44 BY OTHE'S N_ 41 4 INSTALL (1) 4" RISER SECT. or E�- ELBOW RESTRICTCIR '14 LF )'q) I I A M, A EXIST. CB (TYPE 1) FU r - I // ) NSTAL DOUBL 4 i : . NOT TO SCALE FT 8.5' _'HEC� VAUVE EXISTING 5/8X3/4 4., RIM EL. 109.68 > TYP T<1 . , SE IE 108.48 ASSEN U� PER CIT� 4. WATER METER TO RqMAIN 0 OF EE M NDS AS LANDSCAPE METjj To 0 0, STAN D D ET/ I I OVERFLOW ELEV. TO BENCH MARK a_- 0 LO 0 cn INSTALL NEW DRIV PROVIDE DETENTION F 0" MIN. ELEVATION = 110.06 (f) +4+H r 14' WIDE THROAT �14 W AND OIL SEPARATION 1' ELEV. = 110.35 PK NAIL IN ACP iv Ri: . 0'. 1 14% CENTERED ON FRONTAGE Z' 5% 0 B#3 27 LF 6"PVC zr 4 IL S=.005 wl- ON SHEET C-6. F -OW PIPE SUPPORTS: 4 N 0 w 3"x.090 GAGE V) 1 0 21' LINE EL. APPROX. 117.7- 4z A CB#2 %p1 - BOLTED OR IMBEDDED N�o 57 LF 24 CMP_ M OF PROPERTY. SEE DETAIL> > S=2% MIN. go 12 LF TRENCH 00 Ly's c-be wt4FN Rrk PI F 5 1 -F 2" IN WALL AT MAX. A f DRAIN SEE DETAIL ND ".. J Tl� Fr COU6 '0 3' SPACING, MINIMUM I.A�VC L 5 114A 0 'FE THIS SHEET. 0 LLE-f \ r 04 4>� OF TWO SUPPORTS C'4 UMR ui C) 04 ELBOW RESTRICTOR Q2 STA 3+35-0. IE 102.3 L. 10.19 0 Lo E 00 SEE DETAIL ABOVE. 4 INSTALL 6" TAP ON SEWER (n MAIN PER CITY OF EDMONDS 4<1" 8"0 CMP CONCR.TE CURB 14 4 w TYPICAL SIDE SEWER DETAIL. 4 S=0.005 SEE SHT. C-5.------\ A B 4 GU 'ER EXIST. CB (TYPE 1) RIM EL. 109.12 NE IE 107 72 6" '8" C =.00! S IE 106.60 CP W IE 106.96, 8" CMP 00 EXIST. CB (TYPE 1) RIM EL. 109-91 N IE 106 81, 8:: CP S IE 106:81, 8 CP E IE 106.91, 6" CP ALUMINUM ROD, ld2" ROUND STOCK HANDLE TO BE 1 , MAX. FROM RIM WITH GATE DOWN. ,/--SQUARE INSPECTION COVER MARKED "STORM" WITH LOCKING BOLTS, UNLESS OTHERWISE APPROVED BY CITY. . C. . .4 MAX. W.S. 110.3�_ 20 3" 112-19 1 4.. S C i 0 PVC -P.O.C. 4 4 V C14 04 �1 LF 6"Opw 11LEV. 107.05 S= < 9 .4 '�EE SHT. 1, 1 011 04 ,_7VC - C V-) '.4 4 11 LF 6"0 .042 1. - . - ilbOMPLETE SEV� ER & WATER 9 T '14'M 4 <A 'INFORMATION INSTALL 2 DOUBLE 4 2 RAY c) :4 4 D"."'GATE X "P STRAP SERVICE z A- V t 4 44-.' -E 14 --LANDIU.9- LL. 115-15' 116 RESTRI"IOR PLATE RAM *1 1444�� SADDLE & CORP 8LF 2.1 LANDING J.. 40 LF 2"0 TYPE K COPPER STOP. SEE DETAIL w// .81'0 ORIFICE g=.CM al CMP PE, SDR 7 -CANDING 87 4 SHEET C-5 SHARP EDGED CB#1 ro-/ L5 00 00 1,30.00' .0" \90' 9*5210001 E ROCKERY, HEIGHT BENCH MARK! SHOP DRILLED 2 ELEVATION =1 118.17 Fr. BEI`- D 7VARIES TO 3' MAX 71 PK NAIL IN 4CP IN 1\1b 11,3 x I CONTROL STR CTURE LL 2" METER I N STA MATCH EXISTING GRAD , EL. 118.10i 4'X6' OIL/WATER ASSEMBLY. SEE NOT TO SCALE SEPARATOR, SEE SHT C-3 DETAIL SHEET C-5 15"0 D�ETENTIO, t�!� SD FOR PUD PROPERTY WATER METER CZ N F (PuVIS-t� j>IdSCt4,A1?.1rmE IS 'TO FIELb IN ALLEY. SSMH �LAI�IINU) STA. 0+00 1 RIM EL 114.35 N. IE. 100.,00 2f - Of' lha- o.05 Ff-/FT' 0.05 FT./FT. A 1> > t> t> T71 1> tj' NOTES: 1. FOR INTEGRAL POUR CONSTRUCTION1, 1/4" EDGED GROOVE MAY REPLACE EXPANSION JOINT AT INT RFACE BETWEEN THE CURB AND ADJACENT DRIVEWAY. 2. AT CATCH BASIN PROVIDE 1 FOOT WIDTH OF SECTION SHOWN ON ALL SIDES. CEMENT CONCRETE ALLEY G NOT TO SCALE i CLEANOUT SHEAR GATE (PER WSDOT STD. B-3) EXIST. CB (TYPE 1) 1 V I EXIST. CB (TYPE 1) RIM EL. 113.01 FT 60' ROW R'IM EL. 112.37 FT W IE 108.37 W IE 108.91 UTILITY VAULT COMPANY, MODEL # 660-SA SEPARATOR 9. 6" 9.6" W/ 660-ST TOP SECTION AND 660-SB VAULT W1 (2) 12- 660-LA RISERS & SLOPED LID TO MATCH PROPOSED FINISH GRADE. GRADING & DRAINAGE PLAN A A C 0 . . . . . . . n.q. . SCALE: 1 " = 1 Of JOIN CEMENT CONCRETE PAVEMENT DRIVEWAY, SEE PLAN. R=1 NEW PAVEMENT - DEPTH PER PLAN. NOT TO SCALE 100 5" R-1 * 511 5.2" TOP 111.3 SEE PLAN FOR INLET LOCATION 3.9" SEE CONTROL 39.37" ISO- STRUCTURE DETAIL SHEET THIS 8" CMP, IE. 107.05 I.E. 107.05 IZ"O ACO DRAIN =--m-K 100 2 H FiNbRICATOP, TO CALV- Ar-*rF-(Z Fh6RIC46rTION, -w 11 OILMATER 1EIEPARATOR DETAIL 4" PVC Outlet L_ _j H Dimension K100-1 = 5.9" NOT TO SCALE -^R K100-2 = 7.9" Apr K100-3 = 9.8" 3.5- COW ACO POLYMER PRODUCTS INC. rc TRENCH DRA N, 800/543-4764 TOLL -FREE NOT TO SCALE CRY ENGINE5K JRR ENGINEERING SHEET TITLE: THE NICKOLSON OFFICE BUILDING GRADING & OWNER: BRUCE NICKOLSON DRAINAGE PLAN 9829 CHERRY ST. lq\ C-0WP0U_[-:D DEASITV r-ILL r-OR<7-' COVER EDMONDS, WA 98020 SCALE: 1 1 Of /2K 3&A0 1>e5hLjr, rtutsio-A (425) 771-8475 SHEET JOB NUMBER: DATE: 05/21/99 316,100 99-36 ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering C - 3 DRAWN: JES 10/18/99 PER CITY REVIEW COMMENTS RKR WENT NO.: 16030 52ND Ave. W., Edmonds, WA. 98026 OF DATE REVISION APP'D -5221 7 D, CHECKED: RKR No. 99-36 (425) 787-6020, FAX 742 SHEETS FILE NAME: NICK,-/C-3DRAIN.DWG DATE PREPARED: MAY 21, 1999 EXIST. SS C.O. STA. 5 + 21.9 RIM EL. 110.2"' S IE 103.63 TRASH ENCLOSURE EXIST. C13 (TYPE 1) T RIM EL. 109,76--- SW IE 108.26, 6" C P N IE 108.26 , 6",SP NW 1E 108,56, 6' SP-,----' EXIST. C13 (TYPE 1)- [RIM EL. 109.68 SE IE 108.48 BENCH MARK ELEVATION = 110.06 0 , PK NAIL IN ACP 11 I STA 3+35.0. IE 102.3± L0 INSTALL 6" TAP ON SEWER MAIN PER CITY OF EDMONDS TYPICAL SIDE SEWER DETAIL. SEE SHT. C-5. 0 EXIST. CB (-rYPE 1) RIM EL. 109.12 NE IE 107.72, 6" CP S IE 106.90, 8" CP 0 W ^ Is EXIST. C13 (TYPE 1) RIM EL. 109-91 N IE 106 ' 81 8" CP S IE 106.81: 8:: CP E IE 106,91, 6 CP A PORTION OF SEC. 23, TWN. 27 N-2 R. 3 E.2 W.M. 130.00' Tit- N 89052'0.1 E R7L .4- 4 -A 1 4 4 4 z 4 4 4 :-1 .4 L 1.4 NSFORNER & VAU-T PER SLAB U REQUIREMENTS. INSTALL FF EL. 112.19 U DS SHOWN (6 TOTAL) 1 LF 3"0 �SCH 0 P"d 8.5' TYP TAL) S F 112 P P0 .Rt SED U PARIK I N G ; W to 0 0\ V) (n E. BLDG A B 'I -v .5% 1 I q) <\ Aco /A� 0 @ OQ\ LOBBY FF EL. 112.19 C. LF 6-0 2 I:L 3 OV V P P C 0 P LF 6-0 Ir - I .4 4 2.0"-` GATE. P 141 .1412 2-- 4 4- R �14 VALV r EILF 2.0"0 LANDING PE, SDR 7 I-A-RDING/EL. I I j. 11 130. 87 LF 2"0 PE �0' , 2 89*52 00' E B D 15"0 - -EF-E1JTIQ-N-0-P-E-------- S D FOR PUD PROPERTY SSMH ( XISTING) STA. 0 + 0 RIM EL 114.35 N. I E. 1 FINISHED GRADE 0 01 X� COMPACTED BACKFILL C14 �> X� < x EARTH UNDISTURB D 49' USE SPECI�L CARE IN PLACING BACKFILL TO THIS POINT TO MINIMIZE ROCK/PIPE CONTACT. . . . . . . . . . INSTALL COPPER WIRE WITH PIPE IF FUTURE LOCATING IS DESIRED. I OLYETHYLENE (PE), PVC OR COPPER PIPE. PIPE MATE�IAL AND SIZE AS REQUIRED TO To COMPLY1 W/ CODE. PE & PVC PIPE MUST NOT BE IN�TALLED UNDER ANY STRUCTURE OR MOBIL HOME TO COMPLY W1 UPC - EXIST. C8 (P(PE 1) RIM EL. 112.37 FT W IE 108.37 f-lkllf�tAffr% JMDAnC' YELLOW PLASTIC INDICATOR TAPE MARKED "ELECTRICAL" COMPACTED BACKFILL UNDISTURBED EARTH SAND BEDDING MATERIAL SCH 40 PVC OR DIRECT BURIAL CABLE ADDITIONAL AS REQUIRED 30' (1/2 ROW) FIRE HYDRANT TER VALVE --\- � 1 Ij I . 11/-EXISTING UTILITY POLE TO REMAIN SCALE: 1 "= 10' .14 4 3/0-X I REDUCER 4 .. LING & 1 4 COU. A GATI�� VALVE 14, 4 8 L95 3/4" TYPE C A P [A-NDSCAP-E 4 COPO ER FROM 4 T '0 N IRRIGATION EXISTING METER C) 4. 4 T S SYSTEM TO 4 BE DESIGNED A: q 4 4 i 44 HER BY OTHERS LLN 2 L NSTAL DOUBLE ' C O'HECK VALVE EXISTING 5/8X3/4 TO IREMAIN 4.. �'S _ M CIT NSSEM LY PER CIT� WATER METER DF EDMbNDS AS LANDSCAPE METER -- 14% co 6% 4. 4x4 4 4 -2 4 -P-A- kip 1: ..- ." -4 El 11 11R D .4 z* 477� 4" 4' 57<'. 4 Ld Lij .1 4 v -04 4>� Ui C) Q 0 DO .4. 4<4. U CONATE CURB 4. .4 & GUTTiER 14 r I "i �4, .4 '1 -4 .4 lNsTAu- Ibr>L, DE-TSCTI� 4 ro 4 VALVF-. Ar!!ZF-MP,4,y cirV or -P 0 1 rx in E7� trs. EbMW Fc INSTAL L 2" DOUBLE TAX CZTPAP 4Z;7PVlrF' - ROCKERY, HEIGHT�� \-177.g RIES TO 3' MA .1-N Nb INSTALL 2- 4�ER--�,- ASSEMBLY. SEE DETAIL SHEET C-5 EXIST. C8 (TYPE 1) RIM EL, 113.01 FT W IE '108.91 A 4 SADDLE & CORP A 13Y C, I TY 40 [F-2'0- TYPE COP STOP. SEE DETAIL .. 4 ER SHEET C-5 WATER METER Secondary Distribution Trench With Joint UU11ties Final Grade B&CM Conductor 24'Min. 36"Max Water I 36" Sewer 127 Min. Ca ble Telephone Natural Gas: Staked or Shaded with backfil every 1V as required to maintain separatior. JRR ENGINEERING IBENCH MARK ELEVATION = 118.17 FT. PK NAIL IN ACP W SCALE: 1 10, 1 5/ V01 1� V'P-U�ee� 4_-Oe-,V-Uewx�� DATE: 05/21/99 Mo/ izi DRAWN: JES 11�1/18/991 PER C11Y REVIEW COMMENTS I 17 CHECKED: RKR No. DATE REVISION -- F" E NAME: NICKOLSON/C- 1 S&W.DWG 1 1 DATE PREPARED: MAY 21, 1999 THIS PLAN SHEET IS NOT INTEND D'TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTO IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTURAL, EL CTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FO ADDITIONAL CONSTRUCTION ITEMS. �1 CONTRACTOR IS CAUTIONED THAT POTENTIAL CONFLICTS WITH EXISTING UNDERGROUND UTILITIES AND STRUCTURES EXIST, PROPOSED SEWER ACCESS POINTS (MANHOLES) AND WATER LINE ANGLE POINT LOCATIONS ARE PROVIDED BASED ON AVAILABLE INFORMATION AND MAY REQUIRE AINOR ADJUSTMENTS. CONTRACTOR SHALL NOTIFY OWNER OF CONFLICTS ENCOUNT ED. ALL SEWER AND WATER IMPROVEMENTS SHALL COMPLY WITH CITY OF ED JONDS DESIGN AND CONSTRUCTION STANDARDS. UNLESS OTHERWISE INDICATED, A-L SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) SDR 35, WITH RING TITE JOINTS. WATER SERVICE PIPE SHALL BE COPPER, TYPE K OR POLYETHYLENE (PE) SDR-7-3E 3408, AND SHALL CONFORM TO ASTM D2239-81. PRESSURE REDUCING VALVES MA' BE REQUIRED TO COMPLY WITH MAXIMUM PRESSURES ALLOWED BY THE UNIFORM PLUM31NG CODE. C.O. #1, 6"0 RIM EL. 110.60 IE 105.60 C.O. #2, 6"0 RIM EL. 112.15 IE 109.65 6"(TYP) 3" (TYP) D 0 0 EXIST GROUND All- LINIMNINTA TEST CqCKS RESILIENT SEATED SHUTOFF VALVES (2 REQ-D) 3- (TYP) (4 REO D) U0 0 2 UNIONS REQ'D PLASTIC OR CEMENT METER BOX PL I I A-/ SIDE VIEW GRAVEL (12" MIN) I . APPROVED DOUBLE CHECK VALVE ASSEMBLY TO LAY HORIZONTAL WITH GROUND. 2. DESIGNED FOR BACK SIPHONAG--- AND BACK PRESSURE. 3. TEXT COCKS TO EITHER FACE OUTWARDS OR UPWARDS FROM ASSEMBLY. 4. ALL TEXT COCKS MUST BE PRC VIDED WITH PVC PLUGS OR EQUAL. ' 5. THOROUGHLY FLUSH LINES PRIOR TO INTALLATION OF BACKFLOW PREVENTER. 6. THE DCVA CAN BE INSTALLED I BOVE OR BELOW THE GROUND PROVIDED ALL CLEARANCES ARE MET. 7. DO NOT INSTALL IN AN AREA SUBJECT TO FLOODING. 8. MUST BE PROTECTED FROM FREEZING CONDITIONS. 9. THE BACKFLOW PREVENTION AS3EMBLY MUST BE A WASHINGTON STATE APPROVED MODEL. MUST BE TESTED AFTER INSIALLATION AND YEARLY THEREAFTER BY A WASHINGTON STATE CERTIFIED BACKFLOW ASSEMBLY TESTER THE TEST REPORT MUST BE SENT TO THE C17Y OF EDMONDS WATER DIVISION .0MION.D.S.: RE\JISIONS STANDARD DETAIL RESIDENTIAL DOUBLE CHECK ASSEMBLY (STANDARD D.C.V.A. 2" AND SMALLER) DATE SCALE NO. 1a90-199V - J/ 1 I/WW I " Ivi. U00 -7 CrrY ENGINEER SHEET TITLE: THE NCKOLSON OFFICE BUILDING SEWER & WATER IMPROVEMENTS OWNER: BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 SHEET C - 4 OF 7 - SHEETS (425) 771-8475 JOB NUMBER: 99-36 ENGINEER: Ronald K. Rlach, P.E., d.b.a. JRR Engineering 16030 52ND Ave. W., Edmonds, WA. 98026 (425) 787-6020, FAX 742-5221 RKR APP'D CUENT NO.: 99-36 NOT TO SCALE z RUBBER JOINT BISCUIT P OTHER APPROVED WATER7 (FOR FUTURE DEVELOPMENT) PLACE 20 AT END OF SIDE SEWER STUB AND CUT TO LENGTH TO INSURE 3 FEET EXTENDS ABOVE GRADE. PAINT TOP 18 INCHES WHITE. IN 3 INCH HIGH LETTERS STENCIL THE NUMBER OF EVEN FEET FROM GROUND ELEVATION TO THE SEWER STUB INVERT. 8 GAUGE WIRE TO BE DOUBLE WRAPPED AROUND PIPE AND 2X4 - LAMPHOLE COVER TO BE PLACED AT FINISHED GRADE (SEE STD SEWER CLEANOUT DETAIL) 6" WYE AND 45* BEND 6" LATERAL SEWER LINE S PE- 2% MIN. TO 50% MAX OR PLUG NOTE: AN INSERTA-TEE SHALL BE USED. 2-2.5 1. WHEN TAPPING INTO EXISTING MAIN * OR PLACEMENT OF TEE SHA-L DEPEND 45* BEND ON DEPTH OF SEWER MAIN. AS A MINIMUM, THE TEE SHALL BE PLACED AT A 45 DEGREE ANGLEJ 2. IF CONNECTING SIDE SEWER TO EXIST CONCRETE LATERAL, A CONCRETE/PVC ADAPTER SHALL BE USED AND SECURED PER MFGR'S INSTRUCTIONS. FINISHED GRADE SEAL SAWCUT JOINTS W/ AR-400OW I EDMONDS STANDARD DETAIL NOT TO SCALE MENT REPA NOT Td SCALE TRENCH EDGES MUS1 BE SAW -CUT AND I TACKED PRIOR TOI FINAL TRENCH PATCH 6" MIN DEPI 5/8" CSTC: LO U- y cn (n z <M Lu an -p W:2 0 cn CL :2 C-) z r14 REFER TO SPECIFICA ,TIONS Lu FOR TYPES OF PIP� q: IrF RESIDENCE 6" TEE CLEANOUT WITH 45* POSSIBLE NDAND CAP SEWER MAIN LOCATION NOT TO EXCEED 100' BETWEEN CLEAN OUTS CLEANOUT (WYE WITH CAP AND LAMPHOLE COVER) SEWER MAIN LOCATION POSSIBLE 12-+/- WATER TIGHT CAP RISER WHERE TRENCHING THROUGH EXISTING ACP IS REQUIRED, MATCH EXISTING ASPHALT DEPTH OR 3- MIN., PROVIDE 6" COMPACTED DEPTH OF CRUSHED SURFACING TOP COURSE BELOW. MAX TRENCH PATCH PAY WI DTH (SEE TABLE BELOW) --------------- -- ------------------ ------------------ NOTE: REFER TO CITY OF EDMONDS MODIFICATION TO THE STANDARD SPECIFICATIONS FOR TYPE AND GRADATION. ElI TABLE 1: MAX TRENCH PATCH PAY WIDTH TRENCH DEPTH PAY WIDTH 3" MIN DEPTH CL 'B' AC TRENCH PATCH BACKFILL MATERIAL (SEE NOTE BELOW) 4/,A\ U�se C-:t>F WHEN E_ C-O\j E P, 5-S -T-H A H 1 *-4* 40" 4'- 10' 60" 10'-20' 72" DMONDS STANDARD DETAIL NOT TO SCALE 4" OR 6" SIDE SEWER GENERAL CLEANOUT DETAIL 12- ASPHALT SURFACE z M �7_ CL 0 CL LAMPHOL 12" PV( SLEEVE 6" Rl� 6" WYE, �ND 45* AND 8 BENE 4" OR 6" SIDE SEWE CLEAN OUT DETAIL AT PROP z uj cn LAMPHOLE COVER (OLYMPIC FOUNDRY CO MODEL 5931 OR EQUAL 6" RISER 12" P , 'VC SLEEVE NOTE: PVC Cel-'p SIDE SEWER JOINTS GASKEI'ED TYPICAL C_ NOUT UNDE,i� ASPHALT OR CONCRETE EDMONDS STANDARD D ETAI L NOT TO LIMIT OF PIPE ZOt"- IMPORTED MATERIAL REQUIRED PER SPECIFICATIONS ANC TYPE OF PIPE FOUNDATION LEVEI E BASE NOTES: 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES 3. COMPACT BEDDING MATERIAL TO 95% MAX DENSITY EDMOND1r__3 STANDARD DETAIL PIPE BEDDING NOT TO SCALE JRR ENGINEERING STUB LINE SHALL BE SCALE: AS NOTED I DATE: 05/21/99 Cbr- BNCKFILL PeP_ 61TV 6OM' DRAWN: JES _PF_K CITY RFV(FtAj e0Mj-jr_j1,( CHECKED: RKR No. DATE REVISION - FILE NAME: CURR-/NICKOLSON/C-5 DATE PREPARED: MAY 21, 1999 QTY 1jtS-j-ALLF_b C_ ITY JN5T (METER BOX)& LID, 3 PIECE B W/DROP IN C.I. READER LID. 8" TOP SECTION, 10" BOTTOM SECTION BROOKS65 12?' CHECK VALVE METER -2-T COPPER TUBING --"'OYINSTALL 15" METER YOKE gieo (MUELLER CAT. NO. B2422-2 2-So PE SERVICE ITEM �660-999 OR APPROVED LINE TO BLDG. EQUAL) METER LAYING LENGTHS: 1- 1 /2" = 13" 2" = 17" PLUS 1/2- FOR GASKETS STANDARD 2 NOT TO SCALE TRENCH EDGES MUST BE AND TACKED PRIOR TO F1 PATCH 40" MAX. z uj V) (n H Z ui >0 0 LO CD z 0 0 ANGEL METER VALVE INSTALL METER BOX 4" BEHIND CURB OR SIDEWALK FINISHED STREET I -,--CURB GRADE 119 30" - 36" 2 90* ELBOWS COVER 2" COMPRESSION X F.I.P.T. COUPLING (MUELLER CAT. NO. H-15454 7 OR APPROVED EQUAL) - 10 RATION STOP INLET x I.P. OUTLET J-45 WATER MAIN SERVICE SADDLE DOUBLE STRAP ROCKWELL TYPE 313 -CUT TRENCH H CL "B" ASPHALT TRENCH PATCH MIN DEPTH -COLLECTOR STREETS) (2 /.--(3- MIN DEPTH -MAIN MATERIALS) MIN 5/8- CSTC SEE SPECFICATIONS FOR BACKFILL MATERIALS GRADATION SEE SPECIFICATIONS FOR DOMESTIC SERVICE AND A.R.V. CONNECTION DETAILS 45 _T7 1/4 PIPE O.D. MIN. 4' MIN L. ... 2' " - " '. .. . , * A PIPE BASE SHALL BE REQUIRED ONLY AS DIRECTED BY THE ENGINEER. SEE CIASS 52 DUCTICLE IRON PIPE SPECIFICATIONS FOR PIPE BASE MATERIAL GRADATION. U�LESS SPECIFIED OTHERWISE EDMONDS STANDARD DETAIL &TYPICAL WATER LINE TRENCH SE NOT TO SCALE SHEET TITILE: SEWER & WATER DETAILS THE Nl('.%,OKOLSON OWNER: OFFICE BUILDING BRUCE NICKOLSON 9829 CHGERRY ST. EDMONDS, WA 98020 (425) 771- 8475 JOB NUMBER: 99-36 SHEET C-5 OF 7 SHEETS ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering 16030 52ND Ave. W., Edmonds, WA. 98026 (425) 787-6020, FAX 742-5221 APP'D CUENT NO.: 99-36 UTIL11Y 112"1 � CROSSING EXISTING OR TY NEW UTILITY 3" MIN. CLEARANCE Z CEMENT CONC. CLASS 2000 d 4" MIN PIPE UNDISTURBED—/""X TRENC H EARTH 12*0 WIDTH MIN. 1\ NOTES: 1 CONTRACTOR SHALL PROVIDEJ CONCRETE PIPE ENCASEMENT WHERE NECESSARY TO TO PROTECT EXISTING UTILITIES IN THE EVENT THAT A 6" SEPARATION CANNOT BE PROVIDED. CONTMCTOR SHALL BECOME FAMILIAR WITH THE DRAWING TO ANTICIPATE CONFLICTS AID PROVIDE AND INSTALL CONCRETE ENCASEMENT WHERE NECESSARY. NOT TO SCALE NOT TO SCALE 2" COMPACTED DEPTH CLASS "B" ACP 4" COMPACTED DEPTH, CRUSHED SURFACING, TOP COURSE (CSTC) 6" COMPACTED DEPTH GRAVEL BORROW OR EXISTING MATERIAL, AS DETERMINED BY ON —SITE GEOTECHNICAL ENGINEER. REMOVE DELETERIOUS MATERIAL AND COMPACT AS REQUIRED TO ACHIEVE 957. OF MAXIMUM DRY DENSITY BY ASTM D-1557 (MODIFIED PROCTOR) RIGHT—OF—WAY LINE RIGHT—OF—WAY LINE \-- NOVIEUXIMME CRETE DRIVEWAY 5" THICK NOT TO SCALE 7 k 6' 00f-P, 5'�-0'1 I 15L0pF_, — SIDEWALK PLANTING STRIP, IF ANY. RIGHT-OF-WAY LINE INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR //—DUM� —EXPANSION JOINT AY JOINT A -4 4 At 4" V .,Ad 4 4. .4 '40. 'A .4: 4 4 4 4. .4 4 4. A A .,A 444 .4. A -4 4 4 4 . J. .,. . <� . A . 4 -.4 10, O.C. 5, O.0 5' TO 7' -----2% A A 4. V UT A .4 A TT VA 4, .4 4 A V4 X7 COMPACTED NATIVE MATERIAL UNLESS OTHERWISE SPECIFIED BY ENGINEER FULL DEPTH 1/2- EXPANSION JOINT MATERIAL NOTES: 1. CONCRETE SHALL BE CLASS 3— 300OPSI 2. CONCRETE SHALL BE BROOM FINISHED 3. SIDEWALK THICKNESS SHALL BE 5-1/2" AND 6" THICK AT DRIVEWAYS 4. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK 5. CONCRETE SHALL BE SPRAYED WITH CLEAR CURING COMMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS. EDMONDS` STANDARD DETAIL CONCRETE SIDEWALK DETAIL NOT TO SCALE RESIDENTIAL - 10'-0" MIN. 20'-0" MAX. COMM./INDUSTR. 25'-0" MIN. 35'-0" MAX. 6" VARIES VARIES CEMENT CONCRETE DRIVEWAY 5" THICK RIGHT-OF-WAY LINE -.od- L.02 FT.LFT. _MAX. )3 FT./F.T. MAX.3 MATCH EXISTING DRIVEWA'( GRADE SECTION Az K. WA 8,�, '71 S T -tONAL Sh F-EXPIRES: 10-25-2001 NOT TO SCALE JRR ENGINEERING SCALE: AS NOTED DATE: 05/21/99 DRAWN: JES _jL1 CHECKED: RKR No. FILE NANE: CURR—/NICKOLSON/C-6 7�y w w CURB TAPER 0. SIDEWALK PLANTING STRIP, IF ANY NOTES: 1 . A REVERSE SLOPE DRIVEWAY IS SUBJECT TO APPROVAL BY ENGINEER CONSIDERING NEED FOR AND COMPATIBILITY OF THIS FEATURE. 2. COMM ERCIAL/INDUSTRIAL DRIVEWAYS WIDER THAN 35' MAY BE APPROVED CONSIDERING TRAFFIC SAFETY AND NEEDS OF THE ACTIVITY SERVED. ALL COMMERCIAL/INDUSTRIAL DRIVEWAYS SHALL HAVE AN EXPANSION JOINT LOCATED MID -WIDTH. SEE SEC. 3.04. 3. A STORM SEWER INLET SHALL BE LOCATED WITHIN 20' BUT NO CLOSER THAN 10' UPGRADE FROM NEAREST EDGE OF CURB TAPER. 4. SEE SEC. 3.01. 5. SEE SEC. 4.01 FOR SURFACING REQUIREMENTS. —00 �18/99 PER CITY REVIEW COMMENTS ATE REVISION DATE PREPARED: MAY 21, 1999 mm ROUND TO RECTANGUIAR OR REDUCER COUPLER TO CONNEC TO DOWNSPOUTS. FINISHED GRADE 4" ADS RISER LENGTH AS REQUIRED u CIO 4" ADS TO 4" PVC uj _j ADAPTER COUPLING. w-j'_ u_ U- 4" PVC WYE — �d Z uj 0 V) 4" PVC PIPE 0 00 000 oftk-'O. 000 0 00 0 OG C, 0 0 0 00 E NOT TO GROUT FRAME TO CATCH BASIN V) - - GROUT P� >< N PLACE SHEET TITLE: TYPICAL DETAILS JOB NUMBER: 99-36 CLIENT NO.: 99-36 NOTTO SCALE BURIED FIU FABRIC NOT TO SCALE BLDG BY OTHERS "-4" PERF. PVC PIPE WITH MIN. 4" DEPTH 1 1/2- WASHED ROCK ABOVE AND BELOW. WRAP W/ FILTER FABRIC. UNDISTURBED EARTH FILTER FABRI 'DUCTILE IRON FRAME AND SLOTTED GRATE DEPRESSED .1' BELOW ELEV. SHOWN ON PLANS GRATES SHALL BE MARKED "DUMP NO WASTE DRAINS TO STREAM" CONCRETE RISER CORRUGATED HDPE WITH SMOOTH INTERIOR UNLESS NOTED OTHERWISE. PRECAST CONCRETE CATCH BASIN TYPE I OR TYPE IL CONCRETE INLET AND TYPE 2 SIMILAR. FOUNDATION GRAVEL AS REQUIRED TO PROVIDE ADEQUATE SUPPORT. UNDISTURBED EARTH. Er FOR TION .4 M. ENGINEF.R THE NICKOLSON OFFICE BUILDING OWNER: BRUCE NICKOLSON 9829 CHERRY ST. EDMONDS, WA 98020 (425) 771— 8475 SHEET ENGINEER: Ronald K. Riach, P.E., d.b.a. JRR Engineering C-6 16030 52ND Ave. W., Edmonds, WA. 98026 OF (425) 787-6020, FAX 742-5221 7 SHEETS A PORTION OF THE SE 1/4 OF SEC. 23, TWN. 27 N2 Ro 3 E2 W.M9 GENERAL NOTES 1 All work and materials shall be in acc?r�ance with these Plans and Specifications, City Design & Construction Standards and Specifi tions and Washington State Department of Transportation 1998 Standard Specific tions for Road, Bridge, and Municipal Construction - (WSDOT). 2. Prior to any site construction to include clearing/logging or grading the site/lot clearing limits shall be located and field identified. 3. All work within the site and City right of -way (R.O.W.). shall be subject to the inspection of the City inspect or a designated re resentative. Prior to any site work, the Contractor shall contact the Eng?inreering Division at ( 25) 771-0220 to schedule a pre construction conference. Field changes (revisions will require engineered as-builts be supplied prior to site approval. 4. The temporary erosion/sedimentation cpntrol measures shall be constructed prior to any grading or extensive land clearing in accordance with the approved temporary erosion/sedimentation control plan. The Contractor is i responsible to satisfactorily maintain these facilities until construction and landscaping is complete and the potential for on -site erosion has passed. 5. Trench backfill of new utilities and sto m drainage facilities shall be compacted to the percentage of maximum density (modi I fied proctor) as, indicated on these plans. 6. Noncompliance with erosion control/reauirements, water quality requirements, or clearing limits may result in violations and or revocation of project permits, plan approval, and bond foreclosures. I STORM DRAINAGE NOTES Unless otherwise noted, all storm drairlage (SD) pipe shall be corrugated high density polyethylene pipe (CPEP) with smooth I interior. CPEP shall be ADS N-1 2 or Hancor Hi-q or equal as approved by the city prior to construction. Where other pipe is indicated, it shall be concrete pipe (CP) nonreinforced, ASTM C-14 (24" diameter and larger to be reinforced ASTM I (CMP). CMP to be galvanized steel with treatment 1 asphalt C-76), or corrugated metal pipeMP coating or better. All CP and C sl�iall have rubber gaskets. Minimum coverage requirements for pipe shall be per m9nufacturer's requirements. 2. All pipe shall be placed on stable eart I , or if the existing foundation is unsatisfactory, the Contractor shall over excavate and backfill with a gravel material as necessary to support the pipe. 3. Pipe backfill shall be placed equally on both sides of the pipe or pipe -arch in layers with a loose average depth of 6", maximum depth 8", thoroughly tamping each layer. These compacted layers must extend for one diameter on each side of the pipe or to the side of the trench. Materials to complete the fill, over pipe shall be as shown on the plans and indicated in these and the referenced specifica ). ions. 4. All grates (inlet and catch basin) shall, be depressed 0.1 feet below pavement level. 5. All catch basins shall conform to WSD I T Standard Type 1, unless otherwise noted. 6. The Contractor shall be responsible for- adjusting all manhole, inlet, and catch basin frames and grates just prior to pouring of cirbs and paving. 7. All catch basins with a depth over 5.0 feet to the flow line shall be a Type 2 CB. 8. All catch basins shall have locking lids.. 9. Standard ladder steps shall be provide n a ca ch basins/manholes exceedlig 5 feet in depth. 10. Catch basins shall have standard cast iron frame and grates and shall be Olympic Foundry or approved equal. 11. All storm drain work must be staked for line and grade p6or to starting construction. 12. Storm drainage stub outs shall be ma ked with a .2x4 and labeled "STORM." Locations of these installations shall be placed on the Record Drawings and submitted to the City. 13. Storm water retention/detention facilities, storm drainage pipe and catch basins shall be flushed and cleaned prior to City of Edmonds acceptance. 14. Prior to any site work pertaining to clLinage, the Contractor shall contact the City of Edmonds to schedule an inspection. 15. The drainage system shall be installed in accordance with the approved plan. 16. One set of approved drainage plans s all be on -site at all times for drainage inspection. 17. No part of the drainage system shall be covered, concealed, or put into use until it has been tested, inspected, and accepted by t e City. 18. Stencil storm drain grates with "DUMP NO WASTE, DRAINS TO STREAM". SITE GRADING AND T.E.S.C.P. �OTES 1 All site work must comply to Appendix 33 of the Uniform Building Code. (1997 edition). 1 2. The Temporary Erosion and Sedimentation Control System shall be installed and inspected by the Public Works Inspector prior t6 all other construction. 3. If cut and fill slopes exceed a maxim[im of two feet horizontal to one foot vertical, a rock or I concrete retaining wall may be required. All rock retaining walls greater than four (4) feet in height are to follow City specifications and to be designed and certified by a Civil Engineer experiienced in soils mechanics. 4. As construction progresses and seasogal conditions dictate, the erosion control facilities shall be maintained and/or altered as required by the City Engineer to ensure continuing erosion/sedimentation control. 1 5. Temporary siltation ponds and all temporary siltation controls shall be maintained in a satisfactory condition until such time that clearing and/or construction is completed, permanent drainage facilities are operational, and the potential for erosion has passed. 6. All disturbed land areas shall be stabi ized as required by the City of Edmonds. See sheet C-2 7. Where possible, natural vegetation will be maintained for silt control. 8. Stockpiles are to be located in safe areas and adequately protected by temporary seeding and mulching. HYDROSEED preferred. 9. The public ROW shall be kept clean. Tracking of mud and/or debris from the site will result in work stoppage. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 1. INSTALLATION: The area of the entrance should be cleared of all vegetation, roots, and other objectionable material. The gravel shall be placed to the specified dimensions. Any drainage facilities required because of washing should be constructed according to specifications in the plan. If wash racks are used, they should be installed according to manufacturer's specifications. 2. AGGREGATE: 4" to 6" crushed rock, quarry spoll. 3. ENTRANCE DIMENSIONS: The aggregate layer must be at least 6 inches thick. It must extend the full width of the vehicular ingress and egress area. The length of the entrance must be at least 20 feet. 4. WASHING: If conditions on the site are such that most of the mud is not removed from vehicle tires by contact with the gravel, then the tires must be washed before vehicles enter a public road. Wash water must be carried away from the entrance to a settling area to remove sediment. A wash rock may also be used to make washing more convenient and effective. 5. MAINTENANCE: The entrance shall be maintained in a condition which will prevent tracking or flow of mud onto public rights -of -way. This may require periodic top dressing with 2-inch stone, as conditions demand, and repair and/or cleaning of any structures used to trap sediment. All materials spilled, dropped, washed or tracked from vehicles onto roadway or into storm drains must be removed immediately. HYDROSEEDING GENERAL NOTES 1. CONSTRUCTION ACCEPTANCE: Will be subject to a well established ground cover which fulfills the requirement of the approved construction plans and these specifications. 2. All seeded areas shall be protected from trespass and trampling by erecting temporary fences, barriers, signs, and the like as required. Do not work in, over, or adjacent -to seeded areas without proper protection and safeguards. Seeded areas shall be kept moist until well - established, and showing a vigorous, uniform stand of gross. 3. All disturbed surfaces within the site, or affected R.O.W., not otherwise covered by buildings, asphalt, gravel, concrete, mulch, or other plant mate ria I/la ndsca pe items as indicated on Plans shall be hydroseeded. Hydroseeding shall be in accordance with these plans and requirements of the City of Edmonds. Install seed, fertilizer, and mulch for hydroseed mix at the following application rates: Seed: 4 pounds per thousand square feet. Fertilizer: 12 pounds per thousand square feet. Mulch: 60 pounds per thousand square feet. Jute or excelsior matting shall be placed on all regraded slopes steeper than 2 1/2:1, regardless of whether slope is seeded or planted. 4. PREPARATION OF SURFACE: All areas to be seeded shall be cultivated to the satisfaction of the City Inspector. This may be accomplished by discing, rc!",ing, harrowing or other acceptable means. EXCAVATION, GRADING, AND FILL 1 Excavation, fill, and grading shall conform to the 1998 WSDOT Standard Specifications, UBC Appendix 33, 1997 edition, and City requirements. Work shall proceed to the finished surfaces at the elevations and contours shown on the drawings. 2. Approximate locations of existing utilities have been obtained from available records -and are shown for convenience. The Contractor shall be responsible for verification of locations and to avoid damage to any additional utilities not shown. If conflicts with existing utilities arise during construction, the Contractor shall notify the Engineer and any changes required shall be approved by the Engineer prior to commencement of related construction on the project. 3. Materials excavated in areas requiring cut grading may be used as fill if they meet the requirements for fill material outlined below. No boulders, concrete or aspbjIt chunks greater than 4" in its largest dimension may be used. Such material shall be disposed of off -site. 4. After clearing & grubbing is complete, the ground surface shall be prepared as follows: a. All areas to be surfaced with pavement, concrete, walks or steps, and building slabs shall have the top 12" of existing soils stripped and recompacted to at least 95% of the maximum density determined by ASTM D-1557 (Modified Proctor). b. Prior to recompaction of the stripped material all areas shall be proof rolled in the presence of the geotechnical engineer of the Owner's choice. Any areas deemed unsuitable by the geotechnical engineer shall be overexcavated and replaced with compacted fill material at an agreed unit price based on truck measure of replacement f ill. 5. Imported fill shall be free -draining granular material without organics, and shall cc)nform to WSDOT Section 9-03.10 for Gravel Base, 9-03.14 for Gravel Borrow, or c1ternaie material approved by the Engineer in writing prior to its use. Fill shall have no MDre than 5% passing the #200 sieve. 6. Submit samples of proposed fill material for testing for the determination of the optimum moisture - density relationship per ASTM D-1557 (Modified Proctor), prior to any filling or overexcavation and replacement. 7. Place fill in 10" thick maximum lifts (loose) and compact to 95% of the maximum dry density per ASTM D-1557 (Modified Proctor). 8. Compact all fill using suitable compaction equipment. 9. Add moisture to the soils or scarify to dry soils as necessary to achieve specified compaction. 10. Contractor is responsible for soil and compaction testing in conformance with these specif ications. 11. Soils may also be tested by Owner. 12. Contractor shall strip and re -compact all soils not meeting specified compaction at no additional cost to Owner. 13. For placement of ballast, gravel base, and/or crushed surfacing beneath Asphalt Concrete Paving (ACP), refer to the typical pavement section sheet C-6. K. WA $1 a 1 9 '(0 1 Mi/I �7/5 9 I S T 4�101RAL EXPIRES: 10-25-1999 (a_X-T_ZQ0\ MAINTENANCE OF SILTATION BARRIERS I 1. Siltation Barriers snail be inspected immediately after each rainfall and at least daily during prolonged rainfall. Close attention shall be paid to the repair of damaged bales, end runs and undercuttingl beneath bales. Necessary repairs to barriers or replacement of bales shall be accomplished promptly. Sediment deposits should be removed after each rainfall. They must be removed1when the level of deposition reaches approximately one-half the height of the border. Any sediment deposits remaining in place after the straw bale barrier is no longer required shall be dressed to conform to the existing grade, prepared and seeded. ASPHALT CO CRETE PAVING 1. Materials and workmanship shall conform to the 1998 WSDOT Standard Specifications. Contractor s I hould possess and be familiar with these Standard Specifications. 2. Paving work shall consist of new Asphalt Concrete Pavement (ACP) as shown on the approved drawings. 3. All edges of �existing ACP shall be sawcut to provide for neat joints with new asphalt or other surfaces where new grades meet existing. Removed asphalt chunks shall be disposed of off site in an a I pproved manner, or broken into pieces with 4 of maximum dimension and compacted within the fi I I greater than 6" below subgrade. 4. Class -'B" Asphalt Concrete Pavement shall be furnished and placed in conformance with the materials, methods and tolerances of the WSDOT Standard Specifications Sections 5-04.1 through 5­04.3(21�- Final compacted depth of asphalt concrete pavement shall be a minimum of 2" oras sh I own on the approved plans. PAVEMENT MARKINGS 1. Paint striping I shall be accomplished as indicated on the approved plans and details. 1 2. Unless otherwise noted, pointed stripes shall be 4" in width. 1 3. Strilping paint shall be as listed in these specifications, or one of the following or an equal approved in I advance by the Owner. Sherwin-Williams Pro -Mar Traffic Marking Point White 829 W 1 Yellow B29 Y 2 OR Preserva�ive Traffic Point OR Norton/Morris I Application shall be in accordance with manufacturer's directions. 4. Point stripesl for handicapped stalls shall conform with the current city and state barrier free code provisions and the City of Edmonds requirements. WATER DIST IBUTION 1. All materials shall be new and undamaged. Unless otherwise approved by the Engineer, the some manufacturer of each item shall be used throughout the work. Conti -actors shall furnish a watertightl plug of the appropriate size which shall be installed in the end of the water main anytime wo is delayed or stopped. -2r----4lI­weter-ma n-dis - i u ion -piping -shall - be-d uctile-- iron- pipe,-cement-4ined,stc.ndo rd-t h-tiekness- NO VJATF-P- CI6`s`s52_,0 cl-shafL�_ of®rm to the Standards of-USA-Standard-A-21-.51-(AAfWA7�-151), and be installed in accordanq% -1 11 TH 1,5 p p-o j --wit"- he-monufactUi�o mmendations. Cement lining thickness s WI-be-i cub-f-difffi-c -with-USA-Standard-A21-. :7(AWWAP"- 04), 3-.2, No connection to the existing mains will be allowed except by means of an approved backflow pr vention device prior to satisfactory flushing, testing, disinfection, and receipt of satisfactory bacteriological test results. -4-3, Taps on exi ting mains will be made by the otor__wAh_G!ty-4nspeGtion.,- 5; q, All work and mate-rials must conform to City of Edmonds Standards. f) -. 5, The City of Edmonds Utility Inspector must be notified at least 24 hours pi�ior to commencing construction. -7-.6 The Owner a r the Owner's authorized agent shall notify Utilities of a person who can be contacted r garding problems during construction on a 24 hour basis. SANITARY SEWER NOTES A 1. Sanitary sew I er pipe to be PVC conforming with ASTM D-3034, SDR 35. Pipe bedding shall compl�, with City of Edmonds requirements. 1 ,Z. Ad [-man holes-sholl-have-a--.40400t-d rop-between-4nyert-in--and-4nvert-out-u n I eseNt-qo e,:sMH -r(4,s �ro.TSCT, otherwise--sp,eeified-. -All-manholes -shall-have -Iocking­��. Side sewer I I ocations to be verified in the field prior to construction. -All­-new-mart I holes-shalf-conform-to--eity of -E mords-requirements-.9 6-.,3. All side sewers shall be capped with a watertight plug and shall be marked for location with a 2"x 4" board, pointed white, marked "sewer" and noting the depth of the stub. I 10 gauge locator wire is required on all plastic pipe. -7-.1. All testing and connections to existing mains shall be done in the presence of a representative from the City of Edmonds. �8,.'5- Sewers shall� be pressure tested per City of Edmonds requirements'. Tests will be at a minimum of fd�- psi for 15 minutes. I '.tiv 4+ve--eentr-eet-or--shelHnstallr-at--alF-eonnections-to-existing-downstreem--munhoieu, plugs tG-pr-event-for-eign-debria-4f-em-enter-ing-existing-systemv--T-he-plug-ehal4-rem,eiF,r4fi.- -plaGe-until-f4*naHnspection-and-after-Ahe-debris-is-pumped-from-the--structuie. I 44.(o. All sewer pipe shall be placed on stable earth. Where the existing foundation is, unsatisfactory it shall be excavated below grade and backfilled as required by the City of dmonds. Sewer bedding shall be placed to proper grade and shall provide unyielding continuous support for the pipe. JRR ENGINEERING SCALE: AS NOTED DATE: 05/21/99 DRAWN: JES CHECKED: RKR FILE NAME: CURRr-/NICKOLSON/C-7 ±I /1\ I011'VJ11I Y0�, CITY No. d DATE I DATE PREPARED: VIG,w -r-or"t-Ir RE\/ISION MAY 21, 19 9 9 SHEET TlnE: SPECIFICATIONS JOB NUMBER: 99-36 APP'D WENT NO.: 99-36 THE NI OWNER: ENGINEER: FOR TION A A 7 -7,000 Ui C" ENGINEER 0- 0. ,KOLSON OFFICE BUILDING BRUCE NICKOLSON 9829 CHGERRY ST. EDMONDS, WA 98020 (425) 771- 8475 SHEET C-7 Ronald K. Riach, P.E., d.b.a. JRR Engineering 16030 52ND Ave. W., Edmonds, WA. 98026 OF (425) 787-6020, FAX 742-5221 7 SHEETS /-70 1-z� A,��Z�W5