Loading...
305 ADMIRAL WAY.PDFiiiiii iiiiiiii 13770 305 ADMIRAL WAY �5 A -A Vh I ra., I TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) CRJTICALAREASA�-I,�D M-I(PA DETERMINATION: ElConditional Waiver Ej Study Required Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DA EASEMENT(S) RECORDED PERMITS (OTHER): Iq PLANNING DATA CHECKLIST DATED: SCALEDYLOT PLAN DATED:. �2 SEWER LID FEE LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: SOILS REPORT DATED: STREET USE / ENCROACHMENT PERMIT FOR: WATER METER TAP CARD DATED: OTHER: ti L:\TEMP\Dsrs\Fonns\Sftwt File Checklist.doc (-:A FILE NO. ,Wical Areas Checklist . -�,Go Site Information (soils t graphy/hydrology/vegetation)o q�j , 1. Site Address/Location: AcPr��zl A Adn�i,,_t 'D,� v 2. Property Tax Account Number: bd1Kkr-4'. -Z-60t-,XX.0 A 3. Approximate Site Size (acres or square feet): �4LL ;327e) 3 -44- 15 4. Is this site currently developed? ')( yes; — no. If yes; how is site developed? 5. Describe the general site topography. Check all that apply. X Flat: less than 5 -feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: - grades of greater than 30%, present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): rncAt%c,_ bQ t KKArtd is a- I'. i r>tope- or!arn::t�er r^&.r; r4L V-n b 1' -5 (1)RgC( 6. Site contains areas of year-round standing water: r-10 Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year?, 8. Site is in the floodway r­�o floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? no Flows are seasonal? no (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,sbrubs etc) 11. Obvious wetland is present on site: r,.o For City Staff Use Only-- 1. Site is Zoned? N._) 2. SCS mapped soil type(s)? L693AH LaA *4 _11D 3. Wetland inventory or C.A. map indicates wetland present on site? 4;.:- :-,..Critical Areas inventory or C.A. map indicates Critical Area on site? 5. *Site within' designated earth subsidence landslide hazard area? 6. esignated on the Environmentally Sensitive Areas Map? 4�n aA DETERNfrNATION -`STUDY REQUIRED CONDfTfONAL WAIVER W AIVER* Reviewed by: A0ek�0CA,/_—_. Planner date R9VOYON94 C.A 07, 0 0 9 City of Edmonds Critical Areas Checkli st The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whet -her any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist,'sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for i-n—dividual lots of the parcel with enough detail that City staff can find and -identifythe subject parcel(s)_ In addition, theapplicant shall include other Pertment information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site - I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner I Applicant: Por-+ n� Name r�M Street Address tOXI-Or�VS, LJA q,262,.D -7 -7 9 - oSqq Cfty"�$t� �'f Phone - Altfll Signature I'll Date Applicant Representative: Le,stle, so4,ia Name 9 ;VI �4or 4, 7 & K- S �rr� Street Address te- W A, Ci ? 10 3 7S4k-(-9aG City, State, ZIP Phone g�05b Qzt-'� ( , Signature Date OW '. 7 7 OILE NO. C Critical Areas Checklist I L�_ 1 (01-11 Site Information (soils/topography/hydrology/vegetntio 1. Site Address/Location: 92+77h���� Z IQ 41 -1 _-t!)005 2. Property Tax Account Number: L 4� ��ft ­­7 3. Approximate Site Size (acres or square feet): (�)OO 4. Is this site currently developed? —Zyes; no. If yes; how is site developed?FAV62 FAIObL� LOT 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes. present on site of more than 15 % and less than 30 % ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: E1,=- Appr ox. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? �\ 11 Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: --For City.Staff Use Only n*6d?-* I Site:is:Zo 2. SCS mapped s . o il type(sr A LA t4l-::) Wetland+ inventory or C.A.+ map indicates wetland present on site? 4. Critical.Areas inventory or C.A. map indicates Critical Area on site? T. .5.: Site within designated earth subsidence landslide hazard area? JIC2 6. Site desig gnated on the Environmentally Sensitive Areas Map? DETERMINATION STUDY REQUIRED ER Reviewed by-7 Planner CONDITIONAL WAIVER bate Rev 04/2919-4 8 9 0 . 19 q - City of Edlmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. With a signed copy of this form, the applicant should also submit a vicinity map or plot plan for individual lots of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant shall include other pertinent information (e.g. site plan, topography Map,, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: ME SIX -- MIEWMAN AL 6v� " I ,. uft� Street Address Applicant Representative: a I E e '�" M, -, - S. Name 1(op'z? /C>qf- ftj�-' Nk- Street Address Vh Tiq &60(4 5�ity, State, ZIP Phone City, State, ZIP Phone ig ur D. te 1, �gn Date i LI SECTION .23, T27N) R3,El W.M. BURLINGTON NORTHERN RAILROAD NO-&- bOLLAAD TO RIM— x M, S4 233-1frW 634.33' L.rC CA .6 Qj rp'. 4- -rf- it 11 1 1 ..Lft AS - lie w -.M I it it I, 'I 11 er it It I G L 2L JL J'0 L , - -j L L L , - . 0 TO. bwew-m A. ON, Gt! cc cc 0 7 1173 A n 0 C"O. C I C AKC, -T 1C AWMIRAL-�AY fr. F-I TI, �,- I I I OEMOLITION NOTES ffe. TO Ac".w —Awlt c6-k aroceme �Te. kc— s. PC- 3 8CMOW POST WAT PADS ae.."PeNce `c� 11 — --- 4 CONTACT CITY W.TeS cer"Tucal, To ltrume WATM NCIERS PSSCONNE� CLEC`RUCA� LINCS AMO "ANOON I CL— —e PaCKTKNALLT LppT 6LAkK U XZ-Oft PCHCE AA10 STOCKPM � �T r REAR;Vc P—eucur To SOUTH mat w � ftec, "CHcH 0 LHUHT"Le TO &CARM ASANDOWD TeLCPHOME VAULT P-WW.T AND SwCwA,,CS TO C�w )I i race$ To Achw 5. be Rt.OVC0 or OrMeAS 0 cc �SOW~ 0) 1;.;Fd T. �V I I " I I I \ T, I I I OfMOLITION SEQUENCE ALL EROSION ANO SCOIMCNTAIOM CONTROL OtVICES SMALL - lKSTAl.Lm PRIOR TO OR AS THE IRST STAGE OP O—OLITION. CC CROSION CONTROL PLAN SHORELINE PERMIT SUBMITTAL �RT OF EDMONDS IARINA IMPROVEMENTS 1i ( e Peratrovich, Nottingham & Oracie, Inc. Engineering Consultants Ell Fk.1 A ...... Wt. 200 S-116, W-hft,qlan. 90104 1205162�1361 FAk-120.1524-UaR FILL AREA DEMOLITION PLAN >-ia. CL.Tia os'. 0 0 � 06 C� a LEGEND mozi QUARTER mmm cwmm MONUMENT (AS DESCRIBEE, IN DPAWM) DNR LEASE NO. 22-002684 4'� I v,4 SCALE IN FEET 100 0 IOD .2w UWE ir EnREME LOW TIDE ELEY -4 40 *0,5' LINE OF MEAN LOW TIDE Em - Lw LINE (f MEAN W" I" EM MAW 2.PKE" PUGEr SOUND HONEST ESIDWED TIDE - 14.00 *MW = Ww= - 110-90, MEhM (HALF) TIDE LEVEL - IL043 or Nm . Sm. MEAN LOW WATER 2,00' MEM LOWER LOW WATER - mool LOWEST ESTIMATED TOE - -6.50 *00 U 0 LEGAL DESCRIPT10 N I POINT OF BEGINNING Ab LEASED PARM AREA - SM494 SOL FT. OR ISM ACRES PER AREA INTHIN LEASM PARCEL - 14.70D SO. FT. 4cb, sdw5y2n emir RECORDING CERTIFICA7E A.F.No. MED FOR RECORD BY MOM 0. WMUM= TNTS 27 DAY OF:yUkv 2QA& A60. AT " momES Pw-&-ocuoaLAAL. AM I P En IN VOLUME MIRYM ON PACL--=----,RECS)M OF 9BOHMM CDBXW, WASHNITIM A. CULINTY AUonuR re �,* DEPUTY a.AiAVMmwVo'Iw- ENCASED CONCRETE MONUMENT-- I 'o WITH 2' BRASS DISK & *)r Z� ORTH WARTER CMIER NWSM'i 30D.W NWSrOrW 303.00' 0, L LEASE DESCRIPTION AND '-,V N ENCASED CONCRETE MONUMENT U & 0 LEGAL DESCRIPTION 10- WIN LEAD PLUD & COPPEB Ip V I� 00 DEEP. N4232'51'f. PMA POINT OF 00 0.9 03 FROM SECTION U`c NO. 2V-80026 MMENCEM�r/ EDMONDS TIDELMDS Tp-b= 1 EDMONDS MAMMA LEASE DESCMpnoNr POINT OF BEGINNIN MONUMENT WORDINATES A TABLE MOM NORTHING! ustm �l MI&FIV-51 1071M"27 20MIJ5 I 1257641." ob "74"M 257t97.3a wvERNmmr uff i PARCEL 1 VERTIC-41, DATUNI - AWM LOWER WIT WATER AM - M EEWDAV= . USC&M BRASS CAP MONUMENT OR772 244 ACRES 110M. G.' AT SIT CORNER OF PORT Or WCHT CLUB BUILDINM ELEWMOM - t5.67 FEET .04 HORMONTAL DAIM WASHMM PLANE ENCASED CONCRETE MONUMENT CDOR0QQk7ES. MAD891901) WITH 2' BRFSS DISK At ')r O.W DEEP. N5lrlZ42W. OAW THIS SURIYV MEETS OR.EMODS THE SIMON= FROM PROPERTY CORNER SET FORM 0 RON 50.09 AND WAC 332.130 AV I EASE DESCRIPTION THAT PORTION OF THE HANSON AREA IN IIRW Of IN SECTION 20. TOWNSHIP 27 NORTH, RANGE 3 EAST. WTILCIDE'SiCERNEOD"DAIS 30.7 COMMENDING AT*THE NORTHWESTERLY CORNER OF SAID TRACI 1. THENCE SMITH IB`5r46" WEST ALONG THE WMMY BOUNDARY OF SAID TRACI 1. SAID BOUNDARY ALSO OEM THE 00" HARBOR UNL A DISTANCE OF 4511,14 FMT TO THE POINT OF BEGINNING; THENCE NORTH 4r27'09' WEST 055.02 FEET TO THE WIER HARBOR LINE. PIER TRA= It A THENCE SMITH IB3S`48` WEST ALONG THE WIER HARBOR LINE A DISTANCE OF f391411 AREA - 63AM SO, FF. FEEf. THENCE SOUIN W53*2r EAU 630.12 FEET TO PC MIER HMO= UME. VOICE OR 1.40 ACRES� MOM ISW*4r IMST MAW THE KKR HARBOR IN& A DISTANCE OF 9MIQ FEET TO roW3r R w 1RULOW700FA ll�C= ASIOMARAO XE OR LE R SOM 978 SUITE L - 137JW DEPARTMENT OF TRANSPOROUICIN ON= NUMBER 51-035910'. AND SUBIECF TIT SWRM ORMN EASEMENT RECORDED IN THE RECORDS BF SHOMSM COUNTY. WLVNINM 2OF EASOM IN UTILITY AND ON= MM" FILIE NUMBER 11112=180, MAINTENANCE ACCESS PER _mw 'D` SUE AmmDeff LEG& DESCRIPMN FOR THE UNAUTHORIZED USE AND OCCUPATION 3- AREA (U & 01 21 -,DW27&- "m PoRnom cr YK am um Or Pum som mmm THE WTER Nomm LINE DO FRONT Or IDUCT 1. EDMONDS TIDELANDS IN SECTION M TOOMW " MORTK 2 RANGE 3 EAST. W.M. DESCRIBED M FOuLCft AREA 54,353 COMMMAGING AT THE NORTHWESTERLY CORMER OF JAID TFMCI 1. TWENCE SOUTH OR I" IlY5S`W WEST ^04 THE WESSERLY' BOUNDARY OF SAID TRACT 1. SAID BOUNDARY ALSO BOND ?HE 0111131 HARBOR LINE. A DISMICE OF 45IL14; TWENCE ?=lH 477rW 4,.. WEST. 655M FEET M THE INEMM SoUll IV53 TOM ALOW THE OUMR HARBOR I= A =CrOFMOM FEET TO THE POW OF BESIMMING, ITIS'SS, THMCE CONTINUING SOUTH 1813`46" WEST ALONG INE OUTER HARSOR LINE A R IOMaO` DISTANCE Or 43DAW. THENCE NORTH 7rOIrIV MR. 167.64 FUr THENCE - L 324.31' im"40' EAST 430AD FEEP IMENC[ 71W14 EAST. 197,54 FEET 10 THE POW OF COMPA" 4068=1 FEET, OR 125 ACAM mow OR LESL CONCRETE MONUMUff SW CORNER OF HIT 1/4 &W4 X= 29 mvs3,av Inser RANGE 3 EAST. ISM RECORD OF SURVff-F6R-- " suRvEy6Rs cEmwATE CITY OF EDMONDS IN THE RK 1/4, MW 1/4. SECTION 26. T.27N-. R-3E.. W.M. THIS IIIAP CORRECTLIr REPAF9F rI9 , S URVEY WX BY ME OR UNDER w . DIRECTION IN CONFORALANCE WITH THE mmmmaxm or THE suRvEy RECORD AT THE IMIUEST Or CRY OF EDMC*= EDMONDS. SNOHOMISH COUNTY. WASHINGTON ?m ualsm 51 - 56 sma 525 THIS .......... Im - tomaw Fk 45 741-M 12-07-gPl - L& No. 17672 REGISTERED LAW SUwwTm - -1 '�' -01 -717 0'w,� -2 17:13, z T v 6dm- ull u"l aji. cm uj 0 C:) C3 -I C:) LEGEND QUARTER SECTION CORNER MONUMENT (AS DESCRIBED IN DRAWING) SCALE IN FEET 100 0 100 200 PUGET SOUND 64 c c -vi-* too clv!q 4F a Ci IT *c) Ar -0 0'a. cj 0 0 604' 0 ENCASED CONCRETE MONUMENT #1 WITH 2" BRASS DISK & "X* NORTH QUARTER CORNER. UZ A .0 SECTION 26, TOWNSHIP N N -.0 68&1. 27 NORTH. RANGE 3 EAST WIR LVACE D's 0 2" ?v A - N88*57'09"W 300.08' N88'57'09"W 303.8 0' 411?�#2 10 N88!57'09"W 688.03' 23 o* �3 26 LEASE* DESCRIPTION AND lb C) g, ENCASED CONCRETE MONUMENT 8 N88'57 '09' L SE DES� RIPTI 26 I -I k n I rr'Al nil rE MONU ENT U & 0 LEGAL DESCRIPTION WITH LEAD PLUG & COPPER. f T PMA POINT OF COMMENCEMENT TACK, 0.9' DEEP, N42'32'51"E, NO. 22-80026 0.03' FROM SECTION LINE EDMONDS TIDELANDS TRACT 1 0 1910. -F 4p a 0 .0, ;-?o /40 ls�Mzff 4,, �P; �4' I blo 144 3, 40, 46 %of� > "'o ,,, 21. "e'*' %� ��j' 06, 04, 0're ",b) �';ow!lvp Al LEASE DESCRIPTION EDMONDS MARINA kAl POINT OF BEGINNING MONUMENT COORDINATES LN, TABLE LINE OF EXTREME LOW TIDE ELEV = -4.50 ±0.5' LINE OF MEAN LOW TIDE - ELEV = 2.80' LINE OF MEAN HIGH TIDE - ELEV = 10.06' PER SOUNDINGS TAKEN DECEMBER 7. 2001 TIDE VARIATION TABLE ov (96 - EDMONDS) A HIGHEST ESTIMATED TIDE = 14.00 ±0.5' co MEAN HIGHER WATER 10.91 MEAN HIGH WATER 10.06' co MEAN (HALF) TIDE LEVEL = 6.43 v- co NGVD = 5.89' C-7 MEAN LOW WATER 2.80' MEAN LOWER LOW WATER - 0.00' LOWEST ESTIMATED TIDE = -4.50 ±0.5' U & 0 LEGAL DESCRIPTION POINT OF BEGINNING PIER: LEASED PARCEL AREA = 693,494 SQ. FT. OR 15.92 ACRES PIER AREA WITHIN LEASED PARCEL = 14,700 SQ. Fr. 600, S88'53'29"E 630.12' RECORDING CERTIFICATE A.F.NO. FILED FOR RECORD BY MICHAEL 0. MICKIEWICZ THis-2-7 DAY OF Tk- he 20-a A.D., AT __4L MINUTES PAST_.L4_) O:CLOCK 4-M.. AND RECORDED IN VOLLIM E* OF SURVEYS ON PAGE AECORDS OF SNOHOMISH COUNTY, WASHINGTON. 119 7 COUNTY AUDITOR /I REGISTERED LAND SUR _Q� 0 MON NORTHING EASTING' 1 298379.51 1257804.27 2 298201.95 1257641-29 0 W, I t9' 19.% 14 297496.57 1257197.38 GOVERNMENT LOT 1 C3 co PARCEL I VERTICAL DATUM = MEAN LOWER LOW WATER AREA 88,772 SQ. FT. rj BENCHMARK = USC&GS BRASS CAP MONUMENT, OR 2.04 ACRES "TIDAL 9," AT SW CORNER OF PORT OF EDMONDS YACHT CLUB BUILDING. ELEVATION = 15.67 FEET #4 q) .0 HORIZONTAL DATUM: WASHINGTON PLANE . 0. ENCASED CONCRETE MONUMENT COORDINATES, NAD83(1991) . j WITH 2" BRASS DISK & "X" 0.5' DEEP, N58*1242"W O.OS' THIS SURVEY MEETS OR,EXCEEDS THE STANDARDS FROM PROPERTY CORNEh SET FORTH IN RCW 58.09 AND WAC 332.130 97. 5' 4 *a) 292- LEASE DESCRIPTION I U) THAT POR71ON OF THE HARBOR AREA IN FRONT OF TRACT 1, EDMONDS TIDELANDS -IN b pi .7 SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. DESCRIBED AS FOLLOWS: STERLY CORNER. OF SAID TRACT 1, THENCE SOUTH 7 TO THE OUTER HARBOR LINE; BEGINNING; THENCE NORTH 4727'09" WEST. 655.02 FEE t4sor3e3gE 389 COMMENCING AT'THE NORTHWE 18'53'46" WEST ALONG THE WESTERLY BOUNDARY OF SAID TRACT 1. SAID BOUNDARY ALSO BEING THE INNER HARBOR LINE, A DISTANCE OF 458.14 FEET TO THE POINT OF .PIER TRACT THENCE SOUTH 1 tr53'46" WEST ALONG THE OUTER HARBOR LINE A DISTANCE OF* 1383.46 AREA = 63,633 SO. FT. FEET: THENCE SOUTH 88-53-29- EAST 630.12 FEET TO THE INNER HARBOR LINE; THENCE OR 1.46 ACRES NORTH 18*53*46" EAST Alnmr' THE Immro uAoo,,- Wit A VISIMCE OF 928,19 FEET TO 'r 18'35" THE POINT OF BEGINNING; CONTAINING 15.92 ACRES MORE OR LESS; R = 1076.60' SUBJECT TO A STORM DRAIN EASEMENT GRANTED JULY 20. '1978 TO WASHINGTON STATE L = .137.35' DEPARTMENT OF TRANSPORTATION UNDER NUMBER 51-035919; AND SU13JECT To STORM DRAIN EASEMENT RECORDED IN THE RECORDS OF SNOHOMISH COUNTY, WASHINGTON. 20' EASEMENT FOR UTILITY AND UNDER AUDITOR'S FILE NUMBER 8112230188. 256. 91 MAINTENANCE ACCESS PER EXHIBIT "D" SALE AGREEMENT LEGAL DESCRIPTION FOR THE UNAUTHORIZED BV3 3eE USE AND OCCUPATION AREA (U & 0) NO 21-000275: THAT PORTION OF THE BED LANDS OF PUGET SOUND ABUTTING THE OUTFF? 14APRnP LINE IN FRONT OF TRACT 1, EDMONDS TIDELANDS IN SECTION 26, TOWNSHIP 27 NORTH, PARCEL 2 RANGE 3 EAST, W.M. DESCRIBED AS FOLLOWS: AREA = 54.353 SO. Fr. COMMENCING AT THE NORTHWESTERLY CORNER OF SAID TRACT 1. THENCE SOUTH OR 1.25 ACRES 18*53*46" WEST ALONG THE WP!IzrgrPlv an"Kin- - 1, WMU DUUNUAKT ALSO BEING THE INNER HARBOR LINE, A DISTANCE OF 458.14.' THENCE NORTH 47*27'090 WEST, 655.02 FEET TO THE OUTER HARBOR LINE; THENCE SOUTH .18*53'46" WEST ALONG THE OUTER HARBOR LINE A DISTANCE OF 953.46 FEET TO THE POINT OF BEGINNING; A = 17*15'35* THENCE CONTINUING SOUTH 18'53'46" WEST ALONG THE OUTER HARBOR LINE A R = 1076.60' DISTANCE OF 430,00; THENCE NORTH 71'06'14" WEST. 187.64 FEET; THENCE NORTH L = 324.31' 18*53'46" EAST, 430.00 FEEF; THENCE SOUTH 71-06-14- EAST, 187.64 FEET TO THE POINT OF BEGINNING; CONTAINING 80,684 SQUARE FEET, OR 1.85 ACRES. MORE OR LESS. CONCRETE MONUMENT SW CORNER OF NW 1 4 OF NE 11/4 SECTION 26 TOWHSHIP 27 NORTH S7 S88'53'29'*E 1526.68' ,2.01, - I __l_______w. RANGE'3 EAST. WM 191v t RECORD OF SURVEY FOR IDS 'IV G. mr CITY OF EDIVION IKI TUC* KRAI 4 THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER /'rp Nvy 1/-t, or-ullUN ZO, 1.Z/Nol Ko%5t.2 Woms MY DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE SURVEY EDMONDS, SNOHOMISH COUNTY, WASHINGTON RECORDING ACT, AT THE REQUEST OF CITY OF EDMONDS THIS_S"611_ OF"Ags'A_ 20_0g. 17872 728 * 134th Skeet SW - Suite 200 525 '�N88'53'29"W 191.56, SURVEYORS CERTIFICATE 1 Everett, Washiington 98204 -;a Ph: 425 741-3800 12-07-01 L.S. NO. 17672 DWN fff WE mk =on BY WE CHEM SME -01-013 REV 03-08-02 S:\DRAWINGS\21\01\013\015-80\01580.DWG AWP 1,12-13-01 MGM X l" loo ;k 55�w E � n. J,41 (3d NOTE- NOTE- I FOR ;=ACP PLANTER, FURNISH AND IN5TALL PLACE NOZZLE6 IN 12 "x12 " MIRAFl 400 FILTER FA15RIC TIGPT CENTER OF PLANTER FIT TO R18ER (3/4" POLE) AND CONTINUOU6 PERIMETER SEAL W1 SIKAFLEX COVER 50TTOM W1 3" PEA GRAVEL, FILL W1 5PECIAL RAINI51RD STREAM PREMIUM TOP501L. TER f—FINISP BUE35LER w1PC6 SCREEN PLANTER GRADE (24"-36" DI RAIN51FZD PA-aS SHRUB ADAPTER 1/21, SCIP, (90 PVC RISER 2411 3-WAY MARLEX SWING JOINT AT 3-W,4Y MARLEX SUNG JOINT EACP RISER 5CP. B0 AT EACP RISr=R (TYf PVC TEE ... (TYPICAL) 2 D IA. FILTER FABRIC ONTINUOUS, 1/20" 5EAC) POLE SIKAFLEX SEALANT AT r) TYP,) RIM OF ALL FLANTER6 NEW ro 7 ol OVERLAY (TYPICAL) 47-�,P) 2.11 '**�CONNECT ELL TEE 3611 MIN, TO P . DFE 3/4 STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITEI STEPHEN GEORGE WOR CERTIFIED No. 235 1P =9" 00 � RON 5U55LER NOZZLES ]DOCK ENTRY OVER-(50K *2 6EE &PEET L. 6EE 64�ET L-2 5U5 -ZONE 1i0-,&- 5EE 5�4EET L-3 01 — I . 1 1. - _. . - - - - " 1/2" SCk. 80 PVC RISER ,,-2" DRILLED DRAIN POLE III ­ 211 MAXI CORROSION PROOF UN18TRUT MODEL "J" HANI3�=R AT EACH PLANTER AND FOR UNSUPPORTED PIPE LENGTHS, OVER 3(011 OVERLOOK:'] 6EE 5HEET L-2 5Ue;ZONE 10.6 G;FM 5E5 15�4EET L-3 PIPE HANGERS OVERLO01< 5EE 5HEET .-2 2 " �4DFEi/ 0. GALVANIZED ANCPOR 5OLT. \— 3/4" PVC LATERAL 11/2"0, i4" LENGTH SCH. aO PVC 211 �41)FE--/ 5U5-ZONE ro-2 CrF ""N `7 5EE eHEET L-3 --------------- '510, ZONE 1*1 44.2 C:;PM -T L��]� -UTUfRE METEfR, E)OU5LE CHECK V,4LVE F ANID CONTROLLrER NOT IN CONTR,4CT ... .. .. . .. WORTHY AND ASSOCIATES Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these LANDSCAPE ARCHITECTURE RECREATIONAL PLANNING AND DESIGM drawings. Drawing's are for use on this project only and are not intended for reuse 1932 FIRST AVENUE SUITE NUMBEM 606 without written approval from PN&D. Drawings are also not to be used in any manner . that would constitute a detriment directly or indirectly to PN&D. SEATTLE, WASHINGTO N 98101 TEL.206-448-9270 FAX.206-448-0607 N-T-1s. 1.1'....1.1.- 1. � 1.11- . .. ....... 1.11 ­/ -"qNF_'10,(o GFM EET L-3 r ­111 Designed: MN/RF/5W- Drawn: MJN Checked- ell, G W Project No.: e(o -25x Date: 121-9-91 Scale: 11 T__/ 11 17, dz� A- MA APPROVED BY PLANNING (Z Peratrovich, Nottingham & Drage, Inc. Engineering Consultants 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-1388 I R RIG ATIO'N' PLAOP4 IM11111110 Sheet Ll of D I 1 13% S M x -,F= ( oc m y - F EM EM EM I - CE3 sm 0 1 51 10 TYPICAL TH15 5HEET; HDIFE TO PVC CONECTION RA15EID CONCRETE CUR5 CUR5 RAMP f=ARKING/DRIVEWAY WITH A5PPALT OVERLAY IRRIGATION HEAD 5CHEDULE Dr=T,4[L 5YM50L M,4NlJF,4C;TlJRER MODEL NOJIDE5GRIPTION F,,41DIUe &=M (D f;RAINSIfRID f=cs-ow 21 0.13 0 R,4IN5IfRD 5F-5, 1=G5-040 11 .0.4 STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT STEPHEN GEORGE WOVrHY CERTIFIED No. 235 & A 155UEED FOR FERMI 5 WORTHY AND ASSOCIATES LANDSCAPE ARCHITECTURE RECREATIONAL PLANNING AND DESIGN 1932 FIRST AVENUE SUITE NUMBER 606 SEATTLE, WASHINGTON 98101 TEL.206-448-9270 FAX.206-448-0607 Overlook #1 (Occurs once) , , A._.,_ " __,L A�_ Overlook #2 (Occurs twice) NOR., MIN MM Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not intended for reuse without written approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or indirectly to PN&D. Designed: MN/RF/ft � Drawn: MJN Checked: eGW 11 Project No.: 'B625X Date: lb-S-1211 Scale- AS SHOWN RA15ED CONCRETE CUR5 A5PPALT OVERLAY RAISED CONCRETE CURB A5PPALT OVERLAY PORT OF EDMONDS SOUTH MARINA IMPROVEMENTS Peratrovich, Nottingham & Drage, Inc. Engineering Consultants 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-1388 IRRIGATION DESIGN Shoot 11.2 of D TC2418 SECURITY SCREEN 5RU5H FINISHED CONCRETE OVERLAY RA15EID GONG RETE CURB ASPHALT OVERLAY IM S arc PIPE HANDRAIL, TYPE '5' DOCK CART STORAGE (NOT IN CONTRACT) M� HANDRAIL, TYPE 'A'' PEDESTRIAN WALKWAY BRUSH FINISHED w/GRID PATTERN CONCRETE OVERLAY PLANTER CTU5GAN'5ERIE5 BY MAGNALITE) 601 x 15"H x 36"W (typical both sides) PLANTER CTUSCAN' 55RI55 BY MAGNALITIE) 36"D x 24"H (typical both sides) PLANTERS ('TUSCAN ''SERI E5 BY MAGNALITE) 24"ID x lb"H (typical both side) RA15ED CONCRETE CURB CURB RAMP ;zA=e1N1,-�/t-)=I\A=11IAY 111ITLI LJUQIR C1 ILF Y F- ItIl I lLVV1%o1UJ ASPHALT OVERLAY LIGHT 01 DOCK DESIGNATION LETTERS L122 OCK ENTRY, 4'xV w/ LOCK SET NOTES: MT r-UMI. t-NL.)V1L.)l= D BENCHESAND TABLES BY TlM5ERFCfRM HEAVY DUTY 3001b. PINGE5. COLUM51A CASCADE (NW RECREATION (Pipe 4 Mesh Panel System 1-800440-4&5,5) ARE ALL SPECIAL Of"NDER Dock Entry - Front Eleva'tion HANDRAIL HT DOCK ENTRY ITEMS WITH BENCH LE-NGTHb t� -0" A D [-t--Cs LENGTH& FOP, ALL TA5LE5 AND 5ENCHE5 (o" LONGER THAN STANDARD (FOR 5LA5 OVERLAY.) ALL METAL PARTS TO 5E GALVANIZED PER GENERAL NOTES. 2J CONTRACTOR SHALL USE SHOP DRAWING5 AND ACCURATELY FIELD LOCATE AND MARK ALL FURNISHINGS, PLANTERS, TA5LE6 AND BENCHES PRIOR TO DRILLING DRAIN POLE5 AND FASTENERS ANCHOR5. CONFIRM ALL LOCATIONS WITH OWNER. 3.) FILL PLANTERS WITH SPECIFIED PREMIUM TOP501L AND PEA GRAVEL. INSTALL FILTER PA5RIC WITH SEALANT AT 501TOM OF PLANTER PIPE HANDRAIL WITH MESH INFILL PANEL STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT STEPHEN GEORGE WOR CERTIFIED No. 235 TFR60363ro 424 TC2424 TC,3630 TC3630 Overlook #1 (Occurs once 1F%=F=" 01 51 1�1 A 1/1, A /% A 1/\ /111 /\ /\ /\ A, /\. ^� /\- -A, j\ /\ /\ /\ A WORTHY AND ASSOCIATES LANDSCAPE ARCHITECTURE RECREATIONAL PLANNING AND DESIGN 1932 FIRST AVENUE SUITE NUMBER 606 SEATTLE, WASHINGTON 98101 TEL.206-448-9270 FAX.206-448-0607 Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not intended for reuse without written approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or indirectly to PN&D. Designed- RLE/5GW- Drawn: RLF/MJN Checked: SGW LProject No.: 'B&25X -16- EDate: lb-13-lbl - c ScaIZA6 SHOWN PIPE HANDRAIL, TYPE 151 WOOD BENCH - 'PARKWAY' BY TIM15ERFORM - 2Q 5' CIRCULAR PLANTERS BEHIND 5ENCHE6 CTU5CAN'6ERIE5 BY MAGNALITE) IQ 36"D x 30"HAND la 24"D x 24"H (typical both sides) RIFRAF HANDRAIL, TYPE 'A' PLANTER CTU5CAN'5ERIE5 5Y MAGNALITE) 60"L x 36"H x 3(o"W H05E 515 (TYF,) BRUSH FINISHED CONCRETE OVERLAY PLANTERS CTUSCAN'5ERIE6 BY MAGNALITE) 24"D x IVP (typical both side) PLANTER CTUSCAN' SERIES BY MAGNALITE) 36"D x 24"P (typical both sides) PLANTER ('TU5CAN' SERIES BY MAGNALITE) 60"L x la"P x 36"W (typical both -sides) RAISED CONCRETE CURB ASPHALT OVERLAY PIPE HANDRAIL, TYPE 151 T11-15ERFORM 'PA`I;;�KWAY'TA5LE WITH SEATING. MODIFIED PER DETAIL - PLANTER ('TUSCAN' SERIES 5Y MAGNAL ITE) 361 x 30"H x 3(o"W (typica I each end) -- (corners to be square, not rounded, where end planters meet center rectangular planter.) HANDRAIL, TYPE 'A' PLANTER CTU5CAN'5ERIE5 BY MAGNALITE) 601 x 36"H x 3(o"W (planters to be flush whers edees meet - no rounded corners) BRUSH FINISHED CONCRETE OVERLAY PLANTERS CTU6CAN' SERIES BY MAGNALITE) 24"D x la"P (two per side) PLANTER (7U5CAN'5ERIES BY MAGNALITE) 3611D x 2411P (typical both sides) PLANTER CTU5CAN' SERIES BY MAGNAL ITE) 601 x 15"P x 36"W (typical both sides) RA15EID CONCRETE CURB ASPHALT OVERLAY PORT OF EDMU00"INDS Su"UnITH MARINA IMPROVEMENTS , Peratrovich, Nottingham & Drage, Inc. Engineering Consultants - 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-1388 FURNISHHL)IGS Sheet IL3 of t A 30� SECTION 02800 SITE FURNISHINGS PART I - GENERAL 1.01 WORK INCLUDED A, Work in this section includes Layout, furnishing and installing picnic tables, benches, and planters with topsoil, complete with all fasteners, sealants and drain holes, 1,02 RELATED WORK A, Concrete B, Metal Fasteners C, Concrete Drilling PART 2 - PRODUCTS 2,01 PLANTERS A, Furnish and install forty-five (45) planters, Planters shall be TUSCAN series by MAGNALITE, color NS42, Sizes and numbers are shown on plans. Custom drIL[ 2" center -drain holes, fabric, tightly with continuous bead Cover drain holes Sikaftex to planter with 12' x 12' bottom and fit Mlra�i 400 heavy duty geotextite tightly to irrigation riser. Cover seated planter bottom with 4" depth pea gravel, Planters available from MAGNALITE at 1-80 * 0-356-2462, B, Fit[ planters with "Premium Garde n# special blend topsoil manufactured by Iddings, phone 1-800-270-7645, Planters are to be f iUed to 3' f rom top of planter (watersettled). Furnish sp ec sheet and one cubic f oot sampte f or Owner approval, 2,02 PICNIC TA LES Table Columbia Cascade 2054-P and one (1) A, Furnish and install one (1) regular pedestal mounted Picnic pedestal mounted ADA accessible' Picnic Table Columbia Cascade 2055-P, both CU5t0MIZed with galvanized finish and 6" Longer legs than standard (due to overlay stab). Available from Columbia Cascade, phone 1-800-547-1940. All leg supports, bolts and hardware are to be galvanized per General Notes, sheet 6-1. Install per manufacturer's recommendations, as directed by Owner. 2,03 BENCH A. Furnish and install two (2) customized pedestal mount wood benches Columbia Cascade 2016-GP factory modified to 5' 0' in length and adding 6" to posts due to overlay stab, AvallabLe from Columbia Cascade, phone 1-800-547-1940. All leg supports, bolts and hardware are to be galvanized per General Notes, sheet G-1, Install per manufacturer's recommendations, as directe*d by Owner, PART 3 - EXECUTION 3,01 INSTALLATION OF FURNISHINGS p drawings showing customized lengths, dimensions and galvanized A, Provide Owner with catalog cuts or sho finishes of all site furnishings prior to manufacture. B, Install at[ items accurately, within tolerances of 1/4', in Locations. marked by Contractor, C, Contractor shall obtain Location approval from.Owner's Representative prior to installation, D, Install 0 site furnishings in accordance with the Owner's directions and man0acturer's recommendations, Benches and picnic tables are to be installed prior to concrete stab overlay to cover pedestal bases, bolts and hardware, E. Pedestal mount picnic tables and benches using galvanized anc�or bolts, washers and nuts that have been approved by the manufacturer and the Owner, 3.02 QUANTITIES The Contractor shall provide the following types and quantities o I f site furnishingsi Planters 45 Benches 2 Picnic Tables 2 END OF SECTION 02800 SECTION 02811 IRRIGATION PART 1 GENERAL 1,01 WORK INCLUDE (but not limited tol) A, Pipe, fittings, sprinkler heads, and pipe hangers for an irrigation lateral Line serving planters, 1.02 COORDIN.ATION A, Coordinate with the installation of HDPE Line shown on plan sheet M3, 1,03 REFER.ENCES A, ANSI/AST, D2564 - Solvent cements for Poly Vinyl Chloride plastic pipe and fittings, B, ASTM D2241 - Poly Vinyl, Chloride plastic pipe (SDR-PR). C, APWA Standard Specifications, Section 49-2.11, Sprinkler System, 1,04 SYSTEM DESCRIPTION astic pipe and fittings, connections to HPDE pipe, A. A complete hanger supported sprinkler system of PVC pl drawings and specifications, complete and and fittings, pipe hangers, and spray heads, in accordance with the ready for activation when the Drystack Building project (not in contract) follows with future irrigation main, meter, backflow preventer and controller, Inctuded shall be all tabor of installation, including concrete drilling for hangers, plumbing, and at( other items of tabor necessary for a satisfactory operating system, 1,05 SUBMITTALS water Lines, sprinkler heads, pipe sleeves, and drains at completion A, Record Drawings showing location of at[ ize set and additional sets reduced to 1/2 size and enclosed of work. The Contractor shalt provide one fu.(L-s in waterproof package and stored with controller, 1,06 STANDARDS AND QUALIFICATIONS A. Contractor must be a sto'Lte licensed Landscape irrigation contractor. The irrigation system must be instatteof by a journeyman irrigation mechanic or journeyman plumber, 1,07 SCHEDULING OF WORK A, Mark planter locations and pipe routing to show Owner's Representative that Contractor has coordinated with aU trades, 1,08 PROTECTION I before Final A, Contractor responsible for any damage to any work covered by these specificatons Acceptance of the work, B, Securely cover at( openings into pipe both before and after being set in place to prevent obstructions in pipes and breakage, misuse, or disfigurement. 66UEED FOR FER�IIT6 1,09 VERIFICATION OF DIMENSIONS A, Before proceeding with any work, carePutly check and verify all dimensions on record drawings.j report any variation to Owner, 1,10 WARRANTY A. Irrigation is part of the one-year warranty required' by the Contract Documentsj irrigation system repairs shalt be guaranteed by the Contractor to give complete and satisfactory service as to material and workmanship for a period of one year from day of Final Acceptance of the work by the Owner, Should any trouble develop within one year, which, in the opinion of the Owner, is due to inferior or faulty material and/or workmanship, the trouble shalt be corrected, without delay, to the satisfaction of the Owner and at the Contractor's expense. 1,11 INSTRUCTIONS TO OWNER A, Contractor shall instruct the Owner's maintenance personnel in operation and care of the equipment and systems and shall provide data as needed. PART 2 PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A, Manufacturers shalt be as Listed on the plan schedules, B, Any substitution of products shall be reviewed by the Owner after review of product specifications provided by the contractor, Substituticn requests shalt be made prior to the award of contract, 2.02 PIPE MATERIALS A, Pipe 1, Poly Vinyl Chloride pipe shall be in accordance to ASTM-D-2241 and shalt be National Sanitation Foundation (NSF) approved, All supplied PVC pipe and. fittings shall be homogenous throughout and free from visual or physical defects, ALL materials shalt be new and of domestic manufacture. PVC pipe shall be nontoxic, free from taste and odor and self -extinguishing. AA PVC pipe shalt be continuously and permanently marked with the following informationi Manufacturer's nane, kind of pipe, pipe size, National Sanitation Foundation (NSF) approval and schedule number or class designation, Irrigation mainline and lateral tines are to be Schedule 40, Exposed pipe and fittings under promenade are to be HDPE, See mechanical plan. 2. Sleeves and conduit for all irrigation water (Ines and wiring under pavement shalt be Schedule 40 PVC, sized two (2) times the diameter of inserted pipe to allow for easy installation of piping and wiring within the sleeving. 3, Coordinate, provide and instal( all Owner approved connections to HDPE pipe, B, Fittingsi Type and style of connection to match pipe, C, Solvent Cement: ANSI/ASTM D2564 for PVC pipe and fittings, Primer and 717 only- no 725 or 721 2,03 SPRINKLER HEADS A, Provide fixed riser spray heads with MPR inserts and nozzles per plan schedule, 2.04 MISCELLANEOUS EQUIPMENT A, Flexible irrigation risersi Provide triple swing joi'nts using three (3) 90( mar(ex street e((s, No flex or 'f unny pipe". B, HDPE connectioni As needed, provide adapters and 100% stainless steel clamp connectors f or all HDPE to .PVC pipe sections, C. Pipe hangers: Pipe hangers to be co-rosion proof and built for intended use, Provide 3/8" diameter galvanized anchor bolts and Unistrut hohgers, or equal, D, Drainsi Provide 100% corrosion proof Owner -approved plastic ba(L valves at at( system low points, not to exceed 50 feet on center, to winterize the system, PART 3 EXECUTION 3,01 PREPARATION A, Review Layout requirements with planters and other affected work, Coordinate Locations. B, Protect features remaining as final vork, 3.02 INSTALLATION A, The Contractor shall provide at[ concrete cutting, drilling, and miscellaneous Labor, equipment and supplies as needed, 3.03 CONDUIT AND PIPE HANGERS A, Drill and instal( pipe hangers and supporting conduit to. prevent damage to lateral lines during and following installation. 3,04 INSTALLATION A, Welded joints shall be given at (east fifteen minutes set-up time before moving or handling, No water shall be permitted in pipe until a period of at (east four hours has elapsed for solvent weld setting and curling, a, Irrigation sprinkler heads: Minimum riser shall be Sch, ' 80 PVC threaded nipples, size shall be the same as the sprinkler inlet, At( threaded joints are to have teflon tape or paste teflon compound applied to male threads, Risers are to he capped a�t�r installation in preparation for pressure testing, Care must be taken to not overtighten the pipe intc the PVC fltting at the sprinkler tine -riser connection, or into other PVC threaded joints. C, Sprinkler heads are to be adjusted to provided matched preci . pitation at 20 p,s,!, per Owner's approvoJ. 3.05 DAMAGE TO PROPERTY A, Any of Owner's property, including equipment, piping, pipe covering, sewers, sidewalks, Landscaping, etc,, damaged by Contractor during course of his work shall be replaced or repaired by Contractor in a manner satisfactory to Owner at Contractor's own expense before final payment will be made. B, Contractor responsible for all damages, Repair all damage caused at Contractor's expense, At( repair done in a manner satisfactory to Owner, 3.06 TESTS A, Contractor to provide temporary water supply at 20 p,s,!, with 50 gpm flow for performance test, and 60 p,s,!, static pressure test with heads capped. Repair any ' Leaks, adjust heads for matched precipitation coverage, and prove system function lo Owner, All lateral Lines shalt be flushed and pressure tested with att joints exposed to 60 p,s.1, pressure, Loss 'in Lines wit[ be visually checked and shalt not be . more than 5 p,s,!, in fifteen minutes, To be valid, all tests musl be performed under the direction and supervision of the Owner. Any failure in the system to pass this test will require prompt correction by the Contractor and testing wit[ continue until proven correct, 3,07 SYSTEM DEM.ONSTRATION A, Before the sprinkler system will be accepted, the Contractor, in the presence of the Owner, shall perform a water coverage test to determine if the water coverage and operation of the system is complete and satisfactory, If any part of the system affected by repairs is inadequate, in the opinion of the Owner, due to the Contractor's poor workmanship or materials, it shalt be repaired or replaced at the Contractor's expense and testing will be continued until acceptable to the Owner, END OF SECTION 02811 Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not intended for reuse without written approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or indirectly to PN&D. Designed: 5W Drawn: MN Checked; 5W ProJect No.: 'i)62E�X Date: =9- 9 - 91 Scale: FOR STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT STEP CERTIFIED No. 235 WORTHY AND ASSOCIATES LANDSCAPE ARCHITECTURE RECREATIONAL PLANNING AND DESIGN 1932 FIRST AVENUE SUITE NUMBER 606 SEATTLE, WASHINGTON 98101 TEL.206-448-9270 FAX.206-448-0607 141 L Peratrovich, Notting am & Drage, Inc. �__'Engineering Consultants 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-1388 Sheet L4 of C(; D a J C14 V LO N Lo .01 z c4c L04, *C AT APPROACH DOCK SE!r: NOTES. L FLUSH (NOT TO EXCF-ED 1/211) 0 J N 1 6. W L- %w# tN I UNCOVERED OR CONCRETE OVF_RLAY, PROVIDE- BROOM FINISH FOR OVERLAY. WALKWAY� PATTERN AT LOOKOUT ^ ^ &I I "r" Ir k I I I = ^ I I n M e—% m S9 3/811 r:XPANSION EXCFED 1/211) JOINT ­�' Rk NOTE-5: 2) 3) 4) 6 r ��M !I;= Drawn: DRH Checked: Project FDatq- SEPT. 197 scalw. wo; -1 THESE! DETAILS PROVIDE THE GENERAL LAYOUT PATTERNS FOR THE WALKWAY. CONTRACTOR TO SUPPLY COMPLETE LAYOUT FOR APPROVAL PRIOR TO POURING CONCRETE. PROVIDF_ TOOLF-D PATTERN BP-TWF-F-N STA. 1+40.5 AND STA. 9+29 BF-TWF-F-N STA. 1+40.5 AND STA. 5+37 THE! RAISE!D CURB SHALL ACT AS THF_ 1-FOOT BAND. Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not intended for reuse without written approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or indirectly to PN&D. P"ORT OF EDMONDS- ouuTm MARINA IMP ROVEMENT %Pi� Peratrovich, Nottingham & Dra, Engineering Consultants 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-1388 PROMENADE --WALKWAY PATTERN Inc. Shoot L 5 of D ul-- ""WRB RAMP DETAIL <0 �: I 00- NOTE: PROVIDE! CURB RAMR AT FACH I DOCK ENTRY LOCATION. oo-op aP� Nano sEp 1 M7 151 F 26- ICI IDI SOUTH MARINA 0 Ir NORTH MARINA p IHI sQI "RI Isl rr lut IJI MID-MARIN4 'A' lK' N' tv, 101 r U OE LANE MMMMM"M Now m /�N )E NEIN BoA r LIF T JC0 R A C: (3) -N E VV 0 ERHEAD ""sea W L <W Y & TR IL PORT 0 F F T r, F 5; FFFnTT LLL . . . . . . . . . . 0 RAILROAD( DESIGNATED FILL ARE Z), z NOTE! M:�INTAIN SAr FIRE LANES lit v AROUND STAGING AREAS p V. F5, * ADDITIONAL 1 ACRE STAGING AREA PORT OF EDMONDS OT IS AVAILABLE ACROSS THE RAILROAD TRACKS ON THE UNICAL PROPERTY. SOUTH MARINA IMPROVEMENTS C40) E *0 CONTACT THE PORT Or EDMONDS U) FOR ACCESS, ma� pp LOU Pe a h�N no hat�m& D�raa �Inc. Dram QRH 'c Ott' 'r0V r I C� 0 ulta s Wz MARINA PLAN �En neerin na n n< lot Check*& 811 Fi,.t All. . 8 t. 28 0 40 80 160 240 ftettlo, WaWngton, 98104 UA =4j PH: (206) 824-1387 FAX: 1206) 824-1388 I Dpm -A049 Peratrovich, Nottinghm & Drags, Inc. (PN&D) Is not responsible for _j rams methods, procedures of operation, or the construction of the ds*Iqn=Tth..' drawings. Drawings we far use on this project only and or* not Intended for rouse ADDENDUM No. 1 9-17-97 without written appro�al from PNAO. Drawings or* also not to be used In any mann PROJECT SITE PLAN C3 f that would constitute a detriment directly or Indirectly to P1,180. 0 0 r!- C14 to I— z 0 A Csito 00- ON) 0) r W0 OZ <0 00- J N�l U .1 �10 30, 0- 0 SSMH S591 E 81 83.61V' C13 TOP = 13.39 9! GONG. W. IE — 10.99 C CONG. N, 1 — 11 59 P_V_ C S, I E = 12.-0.5. - - YARD DRAIN TOP = 13.39 4! PVC N, IE = 2.49 OW OF— "y C 1 A" too W OP R cjs f7fr P D LLAR T -EXISTING FENCE, WALL, PAD MOUNT AND BOLLARD TO REMAIN 15' x 160.' EASEMENT TO PUD AF 8202030133 CENTERLINE RAILROAD SPUR F 3 HB 97 A HB H13 J- ETER 0 16 09111P 1 51 4�PVC E, E = 12.79 1 'EASEMENT PUD AF 1301 B 6 4ErOO'4eE 228.77' EE.JJJ 8' CHAIN. LINK 8"C ­ %� A IrCao_ 11P SECTION 23, T27N, R3ff,.WM, BURLINGTON NORTHERN RAILROAD 1101 tj�R W� j_ W Ig H13 B rpm EJI1 ? 6 5 6 7 U rT7 E3 �13 116 0� =1 .6 PE = 13.b1i I 4b ABANDON EXISTING WATER LINES & POWER ALONG CONCRETE WALL S4T33'1 V'W 834.33' (T) CENTERLINE RAILROAD SPUR N-0 LLWI*R�i_tJ9,H#I_L1116_ 0' ago= W z :3 M W1 FENCE TO REMA CENTERLINE RAILROAD SPUR 0 EJ EJQ LICU # EJB _41 At r14AIN 1-MV 6 ""� PJW7) ti (TjB (-6-)H rid 7 ) H13 ro TEJB(a-NB B _B (1 6)T EJ B & H 0 �+TER 1VPW 70c( M Q r6o 6 7' B '9 L _J L ,P, L 11P 16 GRAVEL GRAVEL B5 1�0 GRAVEL EAS Dr P __7 10, E EME 0 PUD Nro 1 91 P&WITEN UNDEFINE? .10 &_� 12 11 f F 8108130181 WCH�INLINK 1 7.5' L_ EJO & t W4JER MAIN H -'----TOP = 14.75 16 Ir CONC. NW, IE 13.30 TJ 0 43- C V r VM 0 SSMH CROWN C 0 MH 73!40'01" 0 Z Sl 2 MONUMENT �ISSING = . , , (�;, P, (�? 0 TOI 4w DEMOLITION NOTES ITEM TO REMAIN REMOVE- CBIS, STOCKPILE GRATES FOR PORT, ABANDON U.G. PERF PIPr- INTENTIONALLY LEFT BLANK G) INTENTIONALLY LEFT BLANK INTENTIONALLY LEFT BLANK REMOVE HOSE BIBBS, ABANDON WATER LINE, CONTACT CITY WATER DEPARTMENT TO REMOVE WATER METEERS , n 7 DISCONNECT ELECTRICAL LINES AND ABANDON 21 BELOW GRADE INTENTIONALLY LEFT BLANK REMOVE FENCE AND STOCKPILE FOR PORT 10 REMOVE PAVEMENT TO INSTALL STORM DRAIN LINE. 11 REMOVE RACKS QD LIGHTPOLE TO REMAIN 15 INTr=NTIONALLY Lr=FT BLANK 14 PAVEMENT AND SIDE -WALKS TO REMAIN 15 TREES TO REMAIN REMOVE LIGHT POLE AND BASE. ABANDON POWER LINE. SALVAGE FOR USE BY PORT. REMOVE PAVEMENT TO INSTALL SEDIMENT POND 13 co GVW P/M @ MW Mvm am lfflvw 0 AOM -JAWAV MW tWMZ ratrkllM JACIM pox V0 ==RrAOIL affigr W CAWMAL VAL4Lr er ZZWZ01f. TWAWAVIOMM lieff P= -0- Pr Mar P= W AW" -9- M MC ff=W 04 W WAnx mior Wff WArff M= 0 to /*Wpp &Z�r C 0 '*5M I RAL WAY A 16, 11� CROWN NO N1b SARITARY SEWER Be -'VW#A= COMM VAWr W TMePff0AV.&#A7M Pox IV 7zz"710AC VANT 13 POAr 10ff OWMW PO -Or G Cz4W r rm MOM" W= 0 t"M#2W fit " kxxtreffOUND , rayff I" WAxwerMV e/10 LM RIM= I" x x )OF < HOALffew 1JW FROMM Y IM lt� *1 IJ 11P J6 E J B0 7 p 6). C 4.3' EL u 0 TEL P ST EO HB ST ?.1 2 04 U. 6 z wo TRENCH M W �51 20 z 00 rH SAWCUT ASPHALT (TYPICAL) B H B H B4ft EOdl IJP 10 E3 TE3 13 N4 . E3 E3 13 ".Pm 0 . -PC FH 4� CROWN 141 Al 1z I Dookwied: TR Drawre. TR/DRH Chocked - Project No.-25427,14 Peratrovich, Nottingham & Drage, Inc. (PN&D) Is not responsible for safety programs, Detw. SEPT. 197 methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not intended for reuse ecow NOTED without written ' approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or indirectly to PN&D. 0 ASPHALT R/W DEMOLITION SEQUENCE ALL EROSION AND SEDIMENTAION CONTROL DEVICES SHALL BE INSTALLED PRIOR TO OR AS THE- FIRST STAGE OF DEMOLITION. SEE EROSION CONTROL PLAN SOUTH MARINA IMPROVEMENTS Z Peratrovich, Nottingham & Dra �Un Engineering Consultants 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (206) 824-1387 FAX: (206) 624-1388 Inc. C.1 3 Of J C*4 0 z 0 0-1-� f::�T C*40 03 "o too- r wo az <0 B 0 SSMH S58* 1 E 83.61' CB TOP = 13.39 8!' CONC. W, IE = 10-99 6' CONC. N, IE = 11.59 4!' PVC S, IE = 12.05 15' x 160' EASEMENT TO PUD AF 8202030133 YARD DRAIN TOP = 13-39 F 4!' PVC N, IE 12.49 CENTERLINE RAILROAD SPUR ROW OF— /8 C 8, 'r "��'C 1�3 QV ,4ye P P1 ------------- P )U 1 EASEMENT TO D AF 81301 CV N48*00'44!'E 228.717Y 8' CHAIN LINK 10' WIDE EASEMENT TO PUD POSITION UNDEFINED AF 8108130181 0 SSMH CROWN @ SDMH DELTA 73'40'01" RADIUS = 20.00' TANGENT 14,98' FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS: USE STAPLES OR WIRF- RINGS TO ATTACH FABRIC TO WIRE WIRr= MESH SUPPORT Fr-NCE I�POR SLIT FILM FABRICS 211 X 211 POST AT 61 O.C. MAX BURY BOTTOM OP PILTE-R MATE-RIAL IN 811 BY 1211 TRENCH FILTER FABRIC MATERIAL WIRE Mr-SH SUPPORT FMNCI! FOR SLIT FILM FABRIC PROVIDr= WASHr=D GRAVF-L- BACKFILL OR COMPACTED NATIVE SOIL. 21-011 51-011 21-611 211X 211 WOOD POST STANDARD OR BETTER OR EXISTING PENCE MIN 211X 211 WOOD POST STANDARD OR BETTER OR EXISTING PENCE FILTER FABRIC FENCE DETAIL N.T.S. S-ECTION 23, T2.7N R3E BURLINGTON NORTHERN RAILROAD /—CONVEYANCE CHANNEL (SEE DETAILS) lip --- 13— - "b,? ,Ib MONUMENT MISSING SSMH TOP = 16.36 9' CONC. E, 1E 9.92 9' N & S, CTR CHAN 5.40 1001, 07-1 FILTER FABRIC PENCE S42*33'18"W 834.33' CENTERLINE RAILROAD SPUR CONVEYANCE CHANNEL (SEE DETAILS) W3M3 TOP OF BERM ELEV, +151 1 *�"% POND BOI ELEV. +101 B5 STABILIzeD CONSTRUCTION ENTRANCE (SEE DETAILS1 SIDEWALK DRIV ADMIRAL WAY CROWN 6' SANITARY SEWER 7 7 77 11151110 7 1211 M N X 411-811 QUARRY SPAL PROVIDF= FULL WID OF INGRESS/15GREASP-A. STABILIZEb CONSTRUCTION ENTRANCE N.T.S. 2. 'ESC Minimum Rgquirement Stabilization o Exp�sed Areas. All soils exposed by land disturbing activities shall be siabilized by suitable application of BMPs, including, but not limited to, sod, hydroseeding, or other vegetation', plastic covering, or mulching. All BMPs shall be selectedi designed, and maintained in accordance with the Manual. The exposed solls sball be stabilized according to an approved timetable. (4picallY, no SLOPI!- PER PLAN soils shall remain exposed for more than two (2) days from October I through April 30 and no more, than seven (7) days from May I tfirough September . I 30). EL 16.3 MIN 2 CONVEYANCECHANNEL It:,, N42*A3'1 C DRIVEWAY U.1 J 0 CL CENTERLINE RAILROAD SPUR 6' CHAIN K c) C� -MimENTAT ON POND 0 (SEE DETAILS ON DRAWING CL Iz- r T ON PON A ILF ON z,o c) n I tco) 0) M c) LIMITS OF WORK z F, < CROWN ATER SEPARATOR C B-2 X X JP -P IJI CONNECT TO EXISTING NW .......... 27 R/W11\ SSMH R/W TOP = 15.60 N & S, CTR CHAN 6.76 (INVERT) SITE DATUM TEMPORARY BENCH MARK 7' FASFMFNT TO PIJD EROSION/SEDIMENTATION CONTROL NOTES: 1. ALL F-ROSION AND SE!DIME-NTAION CONTROL DE-VIC155S SHOWN ON THIS DRAWING SHALL BE INSTALLED PRIOR TO OR AS THE FIRST STAGE OP SITE PREPARATION. 2. ALL WORK ASSOCIATC-D WITH STABILIZING THE DISTURBP-D A . REAS SHALL, BC- IN ACCORDANCC- WITH SECTION 8-01 OP THE 1994 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION, AND CHAPTER 18.50, CITY OF EDMONDS DEVELOPMENT CODE, AND THE STORM WATER MANAGr=MF-NT MANUAL PRE-PARF-D BY THF- DF-PT. OP ECOLOGY 5. TH15- NECESSARY PACILITIr=S SHALL BE MAINTAINED IN GOOD WORKING ORDER TO PREVENT DF-BRIS, DUST, AND MUD PROM ACCUMULATING ON THr= RIGHT-OF-WAY AND STORM DRAIN SYSTEM. 4. INSTALL SEDIMENT POND AND DRAINAGC- CONTROL SYSTEM PER,DC-TAILS -T C5 PRIOR TO INTRODUCING PILL TO THrz SITr=. ON SHr:C ILL APPROVED e" V A", �] TR Drawre. TRIDRH Checked: Project No.: 9-5427.14 ADDENDUM No. 1 - 9-17-97 Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, Datw- SEPT. 197 methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not Intended for reuse —D scale:. NOTED without written approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or Indirectly to PN&D. X T tMIN", "41111'111`1�m -t JV11:C Peratrovich, Nottingham & Drage, !nc. i17PA-�- <jn Engineering Consultants 811 First Avenue, Suite 280 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-1388 Ahoot C14of GRADING Sf-QUENCf- 1) INSTALL EROSION CONTROL DEVICES 2) INSTALL SEDIMENT POND AND DRAINAGE CONVEYANCE SYSTEMS 3) COMPLETE SITE DEMOLITION 4) STRIP TOP 8-INCHES OF GRAVEL, STOCKPILE FOR REUSE ON TOP OF FILL. 5) STOCKPILE DREDGE! OR EXCAVATION SOIL MATERIAL REQUIRING DEWATERING ALONG DITCH SO WATER IS DIRECTED INTO SEDIMENT POND. 6) COORDINATE SOIL SAMPLING IN ACCORDANCE WITH THE GENERAL NOTES. 7) COMPACT FILL MATERIAL IN LIFTS NOT EXCEEDING 8-INCHES TO A RELATIVE COMPACTION OF 90 PERCENT AS DETERMINED BY ASTM D-1557. 8) COMPLETE GRADING WORK IN SUCH A MANNER TO PROMOTE DRAINAGE 04 TO THE SEDIMENT POND DURING ALL PHASES OF CONSTRUCTION. 9) FINAL STABILIZATION OF THE SITE TO INCLUDE PLACEMENT AND COMPACTION OF THE GRAVEL SURFACING FOR USE AS A PARKING AREA AND HYDROSEEDING OF ALL:5H:lV SIDE SLOPE AREAS AND CHANNEL BOTTOM. INSTALL EROSION CONTROL BLANKET OVER HYDROSEEDED AREAS. z M%J WO az ADENDUM No. 1 - 9-17-97 SOILS BALANCE PHASE 1 FILL FROM MAINTENANCE DREDGING = 100 Cu. Yd. FILL FROM BULKHEAD EXCAVATION = 4,400 Cu, Yd. PHASE II (NOT IN CONTRACT) FILL FROM PROPOSED DRYSTACK FACILITY = 3,500 Cu. Yd, TOTAL FILL = 8,000 Cu. Yd. Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for use on this project only and are not intended for reuse without written approval from PN&D. Drawings are also not to be used In any manner that would constitute a detriment directly or indirectly to PN&D. Dealgried: GW Mo= TRIDRH Chwked: ��ooct No.: 95427,14 o� Eww.SEPT, 197 Scalle.- NOTED MJr, Oki Peratrovich, Nottingham & Drage, [nc, Engineering Consultants 811 First Avenue,, Suite 260 Seattle, Washington, 98104 PH: (206) 624-1387 FAX: (206) 624-138S WEST PROPERTY LINE! 15AST PROPERTY LIN (EXISTING FENCE TO (EXISTING -WALL ANC REMAIN) PENCE TO REMAIN) /-811 MIN. SALVAGED GRAVEL TOP COURSE x 2% 1 —3 x EXISTING GRADE :51 SETBACK PER UBC STRIP TOP 1211 OF GRAVEL & ROCK, STOCKPILE AND REUSE AS SURFACING ON TOP OF NEW FILL. 21 CHANNEL BOTTOMJ SLOPE! AT 0.25% HORIZONTAL SCALE 111 , 2.01 VERTICAL SCALE 111 , 21 EXISTING PENCE x x DITCH INSTALL ER0510N CONTROL MATTING PER MANUFACTURERS RECOMMENDATIONS, TYP. TOP OF WALL r-L.-16.5 'TAINING EXISTING RE WALL v mor-r-A ARn L611 WATER DEPTH 0 100-YEAR DESIGN STORM .7 5% EXISTING GRADE CB-3 TOP OF BERM = 15. RIM 16.56 CB-2 I.E. 12.20 (IN)t RIM 14.86 I.E. 13;07 (OUT) 1. E. 12.47 11 MIN PREMBOAR ABOVE 100 YR EL 100 YR EL= NORMAL EL - 1307�7 ----------- 3 120 LP 1011 DIP CL 2 50 LF 1011 DIP CL 52 SEDIMENTATION , 0 0.51 ;4 SLOPE 0 0.5% SLOPE 0 0.5% 51SETBACK POND PER UBC II! = 11.50 TRASH 60 LP 1011 DIP CL -52U RACK SLOPE 0 0.5% BOTTOM EL 10.0 CONNECT TO EXISTIN NOTE: FIELD VERIFY RIM ELEVATIONS II! = 12.22 USE YPF 2 CATCH BASINS w/ STANDARD INLET GRATE rB B P`MD/DRAINAGE U �,_J HORIZONTAL SCALE 111 , 201 VERTICAL SCALE I" , 21 PHASE I FILL 1V L 1V 4,500 Cu. Ycle. 3H i 31H EXISTING GRADE I HORIZONTAL SCALE III = 201 VERTICAL SCALE 111 , 21 ,0- MD 'R Q r!- C*4 U') z 0 0- 04, *1 U) (3) ..00, < V_ 01�_ <0 �:_J INrERMEDIATE SLOPE BETWEEN PHASE I & PHASE II FILL. PROVIDE TEMPORARY STABILIZATION WITH PLASTIC BETWEEN PHASE I & PHASE II FILL SEQUENCES. PHASE II FILL MZN, 5,500 Cu. Yda. I �,��(NOT IN CONTRACT) 151 ACCESS RAMP 1V V L . 3 \H 3H EXISTING CB-1 EXISTING 2-811 DIP DISCHARGE TO SOUND PORTOF EDMONDS MAINTAINED 4r ON 'I, Ono Br=RM,*. 15.0 C11116 .4A% SEDIMENT PON Peratrovich, Nottingham & Drage, Inc. (PN&D) is not responsible for safety programs, methods, procedures of operation, or the construction of the design shown on these drawings. Drawings are for 'use on this project only and are not Intended for reuse without written approval from PN&D. Drawings are also not to be used in any manner that would constitute a detriment directly or indirectly to PN&D. SAWCUT & RESTORATION SAWCUT 811 811 EXISTING A.C. MIN. MIN. PAVEMENT. X 0- 0 0- 44%k�.. x 6-4 /N TRENCH WIDTH TRENCILJI SECTION - NOT TO SCALE EXISTING BASE COURSE CRUSHED ROCK WSDOT 9-05.90) COMPACTED TO 96% PER ASTM D1557 BEDDING GRAVEL WSDOT 9-05.12 (3) A P PROVIED e, C � ti Elf? J ') Deccm�er, ctl MI-7 (rp Peratrovich, Nottingham & Drage, Ind. Engineering, Consultants 811 First Avenue, Suite 260 Seattle, Washington, 98104 PH: (208) 624-1387 FAX: (206) 624-1388 je 31H 1338"I's q T d.3,� . i : 11-41-47,09