Loading...
306 6TH AVE N.PDF111111111111 5353 306 6TH AVE N ADDRESS: TAX ACCOUNT/PARCEL NUMBER: 00 4134a / 00 00 *0 0 0 BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) CRITICAL AREAS: DETERMINATION: 0 Conditional Waiver 0 Study Required Xwaiver DISCRETIONARY PERMIT #'S: Abb - 6Q 1?2p DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID SHORT PLAT FILE:— LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DA OTHER: LATEMP\DSTs\Fonns\Sbreet File Checklist.doc Fz- T- pup-- V 411- 1 () Fr, -4� I L c ire- f, i6 0471 S-I'At 4'e ir 1<1 131 F-C I r6 F 1, . C-t u� I> CD C ol C= C.0 m N.3 .C= C" CIO,( AAL�zf 4e LL c r Civic Field Skate Park Site & Storm Water Drainage Detail conce ca"Crim S"Im mm 131 -- 0 , v Concrete 49-0008-2-2 Edmonds, WA - Option #2 rev 2 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 9 1 10 1 11 1 12 1 13 1 14 A B FTT 1�u aj @ c D A B c D 0 0 14 CD 13 Q�l H H ULftabaCkub www skatec=cm =2=046554m sEdmonds, VIA Skatepork '4 " L'IOU( 0 ti #2 rev 2 1 49-4D=-a-2 conceprt-,. MAY i110-6 N.T*S. CDNCIWM SKKM FAMM K.U. 2 4 6 9 10 11 12 13 14 <� Lo nol COMPONENT LIST ALL DIMS ARE NOMINAL *INDICATES CUSTOM PIECE 1 02 2120 QUARIERPIPE W/ PI,6.lF(jRW, 10'-8'1 x 8'-3"W x 4'H 2 R22120-12 RtMP EI'L x a'-.5'W � 4'H 2 3 022081 OUARTERPIP[ W/ PLATFORM W-8-L -x 8'-:`W x 2'- 8*H 2 4 SPS220W SPINE RAMP ll*-5'L x 8'-3'W x 2'-B"H 5 R21120-12 RAVIP 81 x 4'-I'W 4'H 5 BP2060-12 BANK W1 FLATFORM W-51 8'-3"W Y. 2'H 7 LANK 7'-6"L x 8'-3"W x SH 13 S00120-12 SPEEDRkMP V-41 . 3'-7*W .4'11 9 SK2150 SPEEDRAMP 12'-IO'L x 8'-3-W x 5'H 10 jB2060-12 HL15D HUBBA LEDGE 12'-6'L x V-15"N x 5'H 1; W096 HUSBA LEDGE 10'-6"L x l'-6W X 3*-311 2 T3120--.- PLAffTORNI 9'-8"L X 8'-3'4 � 4*H 13 Oi3D03 IWO IIRED MANUAL PAD 8'-3"L K 5*W 2'H 14 PRMT120 TRANSITION CORNER RAMP TO SPEEDRAMP 7'-4"L 0'-7"W 4'H I 15 TR120--i STA.IR W/ PLATFORM g'-5"L � !'-7'W 4'H 'I 16 CBCC3 CURVED GRIND DOX 101 x 2V , V-4`11 i HPODI GALV. SQUARE GGRIND RAIL 24ft. CALV. COPING 7cft. 24, S.S. EDGE PROIECTION l9fl. -x:' S.S. EDGE PROIECIION 73ft. 3.S. TRALSPION PLArE 1 1 Ift SHORT GUARD VILS I-ONG GUARD RAILS 0061 Location _FR' (O-V I AT. C, Civic Field Skate Park will be located at 306 6!h—A-venwNorttrin-Edmcirfdra:nd-is-6ersily— accessed by various streets surrounding this multi use athletic field. General Requirements Contractor will be required to complete the detailed scope of work as specified in Skate Park specifications. Gradinix Reauirements To construct this skate park 740 yards of soil will have to removed in order to place cement slab on a solid foundation. Approximately 500 yards of 5/8 inch rock chips and approximately 140 yards of soil and sand or as needed for project. Then 100 yards of cement will be installed to construct cement slab as stated in construction specifications. Drainaae Requirements A detention and drainage system will be installed per City of Edmonds requirements. Detailed site reports are attached. A silt filter fence will be installed around site and all storin'water catch basins will be protected with filter fabric. Security Fence Approximately 750 feet of 6 feet tall security fence will be installed around site to protect the public during construction. Modular Eguipment & Fencin When cement has cured, Skate Park modular pieces will be placed on cement slab and fencing will be installed per construction specifications. Landscapina After contractor has completed installing skate park modular pieces and perimeter fence new turf will be installed around Skate Park to match with existing turf in the area. Recommendations are that no plant material be installed around Skate Park due to the heavy use this entire site receives as a multi -use sports field and skate park. Any landscaping that would be installed would surely be damaged by soccer and baseball activity in this area. Continued Df ")s 16 Skate Park Signage & Regulations Regulation signs will be designed to meet standards of other skate parks in the area. Two 6 foot long benches will be installed on south side of Skate Park so users and the public can enjoy this wonderful sport. Please see skate park regulations below. Edmonds Civic Field Skate Park Regulations Open Dawn to Dusk. This Park is Not Supervised. Skate at Your Own Risk. Parents Supervise Beginners and Small Children. Helmets and Pads Recommended. Skate Respectfully. No Bikes Allowed Within Skate Park Please Keep Park Clean. City of Edmonds Parks & Recreation If any other information is needed or required please contact the names listed below. Brian McIntosh, Parks & Recreation Director 425-771-0230 Rich Lindsay, Parks Manager 425-771-0289 Jim Roberts, Engineering Specialist 425-771-0220 r'V Civic Center Playfield Skate Park Background/History At the October 26, 1999 City Council meeting, the Edmonds Police Foundation donated $4,500 toward the future development of a skate park facility in downtown Edmonds. At that time, Mayor Fahey, Council, and city staff recognized the health and social benefits of skate boarding and the success of the new Lynndale Skate Park, jointly funded by both Edmonds and Lynnwood after a lengthy development process. It was also identified that the park was heavily used and many younger, inexperienced skateboarders had difficulty getting to use the park. The need for a local skate park was identified in the 2001 Parks, Recreation & Open Space Plan and has been included in the Capital Improvement Plan since that time. On March 23, 2004, staff met with the Edmonds Police Foundation to discuss the possibility of building a skate park in the downtown area, and it was decided to form a Skate Park Work Group. On May 17, 2004, members of the Police Foundation and the Parks & Recreation staff organized a meeting. Edmonds skaters, parents, and community members who believed a skate facility in downtown Edmonds would be a valuable asset to the community's youth attended to form an ad hoc committee. On July 13, 2004, staff and committee members met with the City Council Community Services Committee and were encouraged to move ahead with planning the development of a skate park in the downtown area. On January 26, 2005, the Skate Park Work Group presented a report to the Edmonds Planning Board with their findings to date. Committee members reported on different aspects of the proposal which included health benefits; growth and popularity of the sport; the 40 Developmental Assets, nationally recognized building blocks that help young people grow up healthy, caring and responsible; safety; risk management; the Recreation Immunity Act; pictures of skate parks in surrounding communities; criteria for selecting a skate park site; and the proposed location at the Civic Center Playfields. A Public Hearing was scheduled for March 9, 2005. On March 9, 2005, a Public Hearing was held at the Planning Board. Many comments, questions and suggestions were received from the public. At the conclusion of the Public Hearing, the Skate Park Work Group was asked to return later to answer questions from the Planning Board concerning noise impacts on the surrounding neighborhood and provide an accurate site plan of the park. On October 26, 2005, the Greenbusch Company, Inc., presented a comprehensive noise study to the Planning Board. Two other refinements to the original proposal were presented; 1) a location change within the Civic Center Playfields; and 2) a significant change in the product proposed for the site. On November 16, 2005, a Public Hearing was held at the Planning Board. At the conclusion, the Planning Board unanimously approved moving the recommendation to approve the skate park at Civic Center Playfield to City Council. At the City Council Meeting on November 29, 2005, the Skate Park Work Group gave a presentation and proposal to locate the skate park at Civic Center Playfield. A public hearing was scheduled for December 6,2005. At the December 6, 2005 City Council Meeting, a public hearing was held regarding the skate park. Following the public hearing, the City Council unanimously approved locating the skate park at the Civic Center Playfield. -.0% 00 1,4F.-V tb4t�TkJCTIDN SPEC IF ICA TIONS: GENERALi All prospective bidders must visit the project site with the Project Manager prior to submitting rd-161d, 7 A 12' x 12' concrete sample Illustrating color and texture must be submitted and approved by the City prIor.to placement of concrete. TW13RARY C13NSTRUCTI13N FENCE, The contractor will be required -to install opprox1matety 750 tf of 6' high temporary construction fence Qs directed -by the project nonager. ;ITE PREPARATIONo Remove approximately 745 cubic yards of material <approximately 2.5' deep) De -water site prior to Otacing base rock. DRAINAGE ROCK BASE, Place, level, compact and configure approximately 500 cubic yards of 5/8' CHIPS as required -to accept stab and -thickened edge. Utilize Fitter Fabric as depicted In the detalt drawing. CONCRETE SLABi Construct a concrete stab 6' nominal thickness using 3,500 PSI @ 28 day concrete, Slope stab at 2% to the north. Place #4 rebar at 2' 0,C.(both directions) typ. and as shown In the detail drawing. Concrete to. contain f1ber mesh to address cracking, Install Appropriate Steel Sleeves (to accept fence posts) In the thickened concrete edge at centers specified. Imbed appropriate 'Conbiform' brand metal key ways #CT512KK In concrete stab at 16,4' oc longitudinally Qncl 14.19' oc transversally to prevent cracking. Finish Concrete Stab to a smooth finish until all pours are closed. All concrete shatt have Cadman 'Antique Mix' or approved eclulvalent color Impregnated Into all the concrete products. DRAIN SYSTEM (SKATE BOARD COURT AND CONNECTING SLAB SURFACE) Instait a 'Dura Slope' Part No. DS-232 continuous track drain system Inc. Ductile Iron Frame Inc. Ductile Iron metal grate. Slope track draln system as shown. Tie Into an approved detention system. Discharge detention system Into existing catch basin. DRAIN SYSTEM (UNDERGROUND DETENTION) (6,465 sq ft total Impervious surface) Construct detention system to comply with the conditions outlined In the cletall olrQwlng. Tle oletentlon system outfQlt Into existing catch basin approximately 251f north of the structure DRAIN SYSTEM (PERIMETER INTERCEPTOR DRAIN- APPROXIMATELY 380 LF) Install a 6' perforated perimeter drain line as Indicated In the cletall drawing. Place 3/4' washed drain rock around perforated tine. Wrap system with hter fabric. Tie the perforated line to the existing drain system Qpproxlmatety 25' north of the siab via tight line. FENCE CONFIGURATION, (All fabric to be 8 gauge gQtvanizecl. Ati. posts and ralts to be Btack Vinyl Coated) Imbed approl5riate gatvanized metal pipe. sleeves at a depth of 18' to accept 3' Schedule 40 Metal Corner Posts as shown on cletalt, Imbed appropriate gatvanIzed metat pipe sleeves at a depth of 18' to accept 2 112' Schedule 40 Metal Central Posts Qs shown on the , detail. Install 1 5/8' m1d and bottom and top rails In oil areas where the fence Is 6' or 10' high. Fasten top rall with knuckle fittings. Install 1 5/8' bottom and top ralts only where the fence Is 4' high. Fasten top rail with knuckle fittings. Install 8 gauge galvanized 'cyclone' type fence fabric as depicted. Prior to Installing the fence Into the sleeves, the contractor will leave the site to allow for the Instaltation of the skateboard ;:omponents by others. Following Instaitatlon of the components, the contractor will return and complete the Instattation of the fence. I Rebar (Typ) 3 0;0. —21 Pipe Track Where Required Slope Sleeves Drain Terrain @ 21l (Typ) (TIp) to create trwwFdn to existing play fletcl surf ace f Seed ckil Cgst,,bed areas a s reqLdred 00.0 00,06 zi lig >0M!, ;9 K41 Filter FoLbrIc 3/4' Washed River Rock Native Earth 6' Perforated Interceptor Line Wrapped With Filter Fabric 5/8' Chip Drain Rock if Filter FcbrIc Native Sand I ase 11 6# 31 CONCRETE SLAB WITH THICKENED EDGE DETAIL AND PERIMETER INTERCEPTOR DRAIN DETAIL 'Civic Center Play Field Skateboard Park (E5MD C233)', ILI t �ft.lstlng Garage Building T" -Tle track drains toQeth w W Ith 4' ABS Sch 40 TIgh- Construct 8' x 23' Concrete Stab to tie kckte Park to exist Ora TRe.1mbed Track Dral Into Ickened Edge. 2 _.��Instait 3' dameter sch 401i7nd —posts 5' Wlde�atl T112, coo, sc-h 40 cent�,*I pos!�� Dpen�,lng West Fence 4' High-.-' CU, Install Steel Sleeves +; � 10' 3 112' D.C. Vertically -6. 0; 4- Note, Dura Slope DS0232 W >1 Track Drain System (4 maintains appropriate Internal grade North F 6' 1 1/ 21 --*--46'5' (-typf- South Fence 14'0' (typ) 4' High bi 4. Slope Concrete Stalo -F W M k drain 0 Q. @ 2% to trac Q. N L 4; c U U 0 U U 4. A Is :3 M 0. CU CU P cu _d 4- Install Steel Sleeves at 11' 3' O.C. Horizontally CL: W: East Fence 10' High-------* I nstalt 2 V2 entrat it 2 1'. dla sch 4/0 posIts �Instail 3" diameter sch 40 end posts Z �49' �2 SCHEDULE 1 SKATEBOARD STRUCTURE AND APPURTENANCES e I r I line ASW Qp cwkile 0A1 IF" %EW OVA nssc = I I. soees) IE TRACK DRAIN INTO DETENTION SYSTEM A 25* SYSTEM TO EXISX. (25 If) TIGHT LINE PERIMETER DRAIN INTO EXIST CB (25 If) (SCHEDULE 1) NED AS NOTED ENGINEERING RECENED OCT 0 9 2006 BUILDING DEPARTMENT ScTg-n;; fPMONDS ITUILE — DETENTION SYSTEM NUNN at)3 W z z C3 W W 8 L In OD V) 0 0z Z ZZO 0 2 LJ 6 U) Z C-4 LJ I- z 0 z C:� _J LAJ LLI -,z _J Q� a- < a_ LLJ I.-_ z LJJ El M L) LJ U < U " n.t.s. v. 801a n.t.s. SHM 1 m a � -/, CITY OF EDIVIC BUILDING DEPAF OWNER APPROVED DATE BLDG. OFFICIAL AgROD�El) By PLANNING MBER mEET FILE R E C E,,V E D OCT 0 9 2006 BUILDING DEPARTMENT CITY OF EDMONDS City of Edmonds Civic Center Skateboard Park E5MD / c233 SPECIFICATIONS AND CONTRACT DOCUMENTS o&6 MW STRET FIL 6-1k && i�J Specifications and Contract Documents Civic Center Skateboard Park E5MD / c233 CITY OF EDMONDS, WASHINGTON MA YOR Gaty Haakenson CITYENGINEER David K. Gebert, P.E. CITY CLERK Sandra S. Chase CONTACTPERSON Jim Roberts 425-771-0220 CITY COUNCIL Deanna Dawson Richard Marin Mauri Moore Peggy Olson David Orvis Michael Plunkett Ron Wambolt TABLE OF CONTENTS PART I BIDDING DOCUMENTS Invitation to Bid Location, Scope of Project, and Basis of Award Information to Bidder Contractor & Bidder's Checklist Proposal Form of Bid Bond Non -Collusion Affidavit Certificate of Equal Employment Opportunity Report Insurance Certificate (Sample) Prevailing Wage Rates PART 11 CONTRACT FORMS Agreement Performance and Payment Bond PART III SPECIAL PROVISIONS / GENERAL REQUIREMENTS PART IV MODIFICATIONS TO STANDARD SPECIFICATIONS x Modifications to Division I — General Requirements x Modifications to Division 2 — Earthwork X. Modifications to Divisions 3 through 8 x Modifications to Division 9 - Materials x Material Modifications — Divisions 7, 8 and 9 PART V ON SITE DETENTION SYSTEM DETAIL PART VI CONSTRUCTION DRAWINGS I PART I BIDDING DOCUMENTS Invitation to Bid Location, Scope of Project, and Basis of Award Information to Bidder Contractor and Bidder's Checklist Proposal Form of Bid Bond Non -Collusion Affidavit Certificate of Equal Employment Opportunity Report Insurance Certificate (Sample) Prevailing Wage Rates 11 INVITATION TO BID CITY OF EDMONDS Sealed bids will be received at the office of the City Clerk at 121 Fifth Avenue North, Edmonds, Washington, until 2:00 p.m., October 2006, for the construction of the Civic Center Skateboard Park and the furnishing of all labor, materials, and equipment necessary for this project. The sealed bids will be opened and publicly read aloud at 2:15 p.m., October 17, 2006 at the City Clerk's Conference Room, 121 Fifth Avenue North, Edmonds. Plans and specifications and form of contract documents may be examined at the office of the City Engineer located in the Development Services Department, 121 Fifth Avenue North, and a set thereof purchased for a non-refundable fee of $25 each. A certified check, cashier's check, or bid bond in the amount equal to at least five percent of the total amount bid, including sales tax, if applicable, must accompany each bid as evidence of good faith and as a guarantee that, if awarded the contract, the bidder will execute the contract and give a performance and payment bond as required. The check will be given as a guarantee that the bidder shall execute the contract in conformity with the contract documents if it is awarded to him and shall provide a performance and payment bond as specified therein within fifteen days after notification of the award of contract to the bidder. The City of Edmonds reserves the right to reject any or all bids, and to waive irregularities or � I informalities in the bid or in the bidding. No bidder may withdraw his bid after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding sixty days. Sandra S. Chase, City Clerk City of Edmonds, Washington iii LOCATION, SCOPE OF PROJECT, AND BASIS OF AWARD The project covered within these documents involves the construction of a skateboard park to be located at the Civic Center Playfield, as described in the contract documents and drawings. The successful bidder will be required to furnish the necessary equipment, materials and labor. All of the above shall be accomplished in accordance with these bid documents, plans and special provisions. The City shall award a contract based on the lowest acceptable bid for one, all or a combination of the bid schedules in the contract proposal. The combination of bid schedules awarded shall be at the sole discretion of the City. The specifications are the WSDOT 2006 Specifications referenced on Page 11B- I and 1-1, except as revised, supplemented or replaced in the Contract Document. Pre -bid Site Visit — A mandatory pre -bid site visit will be held on October 10, 2006 at 2:00 PM at the project site. All bidders shall be required to attend. Any bid received from a bidder who did not attend the pre -bid site visit may be rejected at the sole discretion of the City. Contact Jim Roberts (425-771-0220) or Rich Lindsay (425-771-0230) with questions regarding the pre -bid site visit. IV I INFORMATION TO BIDDERS Specifications and Contract Manual - The Washington State Department of Transportation (WSDOT) and APWA 2006 Standard Specifications for Road, Bridge and Municipal Construction are the specifications for the project, including the General Requirements, Technical Specifications (Divisions 2 through 9), Standard Details and Drawings, except as amended, modified, clarified, deleted or expanded in this project manual and the design drawings and plans. The combination of all specifications, plans and drawings hereinafter shall be referred to as the "Contract Documents." Bid Submittal Bid subrm'ttal shall include five percent Bid Bond, Proposal, Addendum, Non -Collusion Affidavit and Certificate of Equal Employment Opportunity Report. Award of Contract The City intends to award a contract within thirty days of bid opening. Execution of Contract Successful bidder shall submit to the City within fifteen days of the Notice of Award the executed Agreement, one hundred percent Performance and Payment Bond, and Certificate of Insurance with the City named as an additional insured. I= I CONTRACTOR AND BIDDER'S CHECKLIST THE BIDDER'S ATTENTION IS ESPECIALLY CALLED TO THE FOLLOWING FORMS WHICH MUST BE EXECUTED IN FULL AS REQUIRED: AT BID OPENING (a) Proposal The unit prices must be shown in the spaces provided. All pages in proposal must be filled in. Receipt of all addenda must be acknowledged on page P-5. All subcontractors supplying over ten percent of the total contract bid amount must be listed on Proposal Sheet P-4 or supplied within twenty-four hours of the bid opening or the bid will be rejected. (b) Bond Accompan3jng Bid This form is to be executed by the bidder and the surety company unless bid is accompanied by a cashier's or certified check. The amount of this bond shall be not less than five percent of the total amount of bid, including sales tax, if applicable, and may be shown in dollars or on a percentage basis. (c) Non -Collusion Affidavit This form must be filled in and signed before a Notary Public. (d) Certificate of Equal EMployment Opportunity Rep�grt This forin must be filled in and signed by the bidder. AFTER NOTICE OF AWARD (a) Contract This agreement to be executed by the successful bidder. (b) Performance and PayMent Bond To be executed by the successful bidder and his surety company. (c) Certificate of Insurance Thirty day cancellation notice by certified mail and City named in policy and certificate. CBC-1 (d) Progress Schedule Prior to beginning any work on site, an approved progress schedule, either in the form of a C.P.M. or Bar Chart, shall be submitted showing: (1) each element of work, (2) dates each element of work will be accomplished, and (3) materials order and delivery dates. (e) Intent to Pay Prevailing Wages Certificate The Contractor is responsible for submitting a Department of Labor and Industries Certificate and Certificates for all subcontracts and is responsible to pay all costs. Certificates are required prior to the first progress payment. (f) Prevailing Wages A list is to be posted on the job site. (g) Shop Submittals Contractor shall provide a list of submittals for approval, including the following: 1. Project schedule 2. Truck route plan 3. Sample of concrete surface (color and texture) 4. Other submittals as required by the bid documents (h) Progress PUMents Contractor shall sign payment requests and certify prevailing wages are being paid. Sales taxes paid are to be coded to City of Edmonds Tax Code No. 3104. (i) Contract Completio Contractor requests final inspection in writing to Engineer. After final inspection, City executes punch list and issues Certificate of Substantial Completion, stopping the contract time and starting the one-year warranty period. City confirms work on punch list has been done and executes letter of Physical Completion. Final payment, less retainage and/or claims, may be executed. City to give final acceptance and start 45-day appeal period. 0) Release of Retainag Retainage shall be released after City receives Affidavit of Wages Paid, Department of Labor and Industries Release pursuant to RCW 51.12.050 and RCW 51.12.070, Certification for Payment of Excise Tax from the Department of Revenue and release of any claims filed in accordance with RCW 60.28.0 10 on retainage and RCW 39.08.03. I CBC-2 I PROPOSAL FOR THE CITY OF EDMONDS, WASHINGTON To: Honorable Mayor and Council City of Edmonds Office of the City Clerk 121 Fifth Avenue North Edmonds, Washington 98020 The Bidder, in compliance with your Invitation for Bids for the construction of Civic Center Skateboard Park having examined the specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the work of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies, and to perform the work in accordance with the Contract Documents, of which this proposal is a part. Bidder hereby agrees to commence work under this contract on a date to be specified in written "Notice to Proceed" of the City and to ftilly complete the project within 60 calendar days. Bidder ftirther agrees to pay liquidated damages calculated using the formula in Standard Specifications Section 1-08.09 "Liquidated Damages". The quantities stated in connection with the price schedule for the contract submitted herewith are approximate only and payment shall be made on the prices named for the actual quantities incorporated in the completed work. Any significant changes in the bid quantities shall be negotiated in accordance with the terms and conditions of Standard Specification Section 1.04.4. The undersigned submits the unit prices set forth herein as those with which he will perform the work involved. The extensions in the colurrin headed "TOTAL" are made for the sole purpose of facilitating comparison of bids, and if there are any discrepancies between the unit prices and the total amounts shown, the unit prices shall govern. The above prices shall include all labor, equipment, materials, supplies, overhead, profit, insurance, licenses, fees,, etc., to cover the finished work. All schedule items for which blanks are provided herein shall be completed in full by showing a unit price or lump sum price for each item thereof Unit prices, or lump sum prices for combination items as herein named, shall be used as the basis for computation of the total compensation to be received by the undersigned, all in accordance with the completed schedule of items and prices as follows: P-1 I Proposal for City of Edmonds, Washington CIVIC CENTER SKATEBOARD PARK Project No. E5MD/c233 NOTE: Bidder agrees to perform all work described in the specifications and as shown on the plans, for the following prices. In cases of discrepancies, the unit prices shall govern. Unit prices for all items, all extensions, and total amount of bid shall be shown in figures only. SCHEDULE 1 - Skate[)ark Structure and Aonurtenances 'ITEM APPROX. UNIT PRICE TOTAL PRICE NO. QUANTITY UNITS DESCRIPTION OF ITEM Dirs. Cents Dirs. Cents 1 1 LS Mobilization 2 750 LF Temporary construction fence 3 745 CY Site excavation (removal and disposal of existing materials) 4 500 TN Crushed rock (5/8-inch chips) installed Skatepark structure and all appurtenances, 5 1 LS perimeter drain and fence and all other work complete as required by bid documents not included in other bid items Site restoration including restoration of grass surfaces surrounding the structure 6 1 LS and all grass areas disturbed as a result of construction, both within and outside the construction zone SUBTOTAL SALES TAX @ 8.9% SCHEDULE 1 TOTAL .Rr.l4FntlLF 2 - nptpntinn sv_qtPrn ITEM APPROX. UNIT PRICE TOTAL PRICE UNITS DESCRIPTION OF ITEM NO. QUANTITY DIrs. Cents DIrs. Cents On -site detention system, including 1 LS connection to existing storm system and I I appropriate site restoration NAME OF BIDDER SUBTOTAL SALES TAX @ 8.9% SCHEDULE 2 TOTAL TOTAL ALL SCHEDULES 10) 1. The bidder certifies the truthfulness and accuracy of the following information: a. Firm name and address: d. Contractor's State of Washington License No. e. Name and title of officers: b. Telephone c. Fax d. Type of firm (check one) Individual Corporation Partnership Other 1 2. The following statements of experience, personnel, equipment, and general qualifications of the Bidder are submitted as a part of the Proposal and the Bidder represents and guarantees the truthfulness and accuracy thereof. (If additional space is required, attach information to proposal.) a. Our organization has been in business continuously from b. Our organization has had experience in construction comparable to that required under the I proposed contract as a prime contractor for years, or as a subcontractor for years. c. Following is a list of the projects our organization has completed in the last three years which are similar in character and in magnitude to that required in the proposed contract (or attach a separate job listing): Year Owner Location Phone Number Contract Amount P-3 I I d. The following subcontractors are proposed to be employed to furmsh portions of the construction (subcontractors supplying less than ten percent of the total contract bid amount need not be listed): I Name/Address I TvDe of Construction I % of Total Construction Costs I e. The following information shall be furmshed for any subcontractor proposed to be employed for twenty-five per cent or more of the contract bid amount. The following project list for the last three years shall be for projects similar to the type of construction listed in the above paragraph. —Subcontractor Year . Project Location Contract Amt — f, The following is a listing of all projects we have undertaken in the last five years which have resulted in partial or final settlements of the contract by arbitration or litigation: Nameof Project/Client Original Contract Amount Total Claims Arbitrated or Liquidated Amount of Settlement of Claims Bidder understands that the City reserves the right to reject any or all bids and to waive any informality in the bidding. Bidder agrees that this bid shall be good and may not be withdrawn for a period of sixty calendar days after the scheduled closing time for receiving bids. P-4 I I I I Upon receipt of written Notice of Award of this bid, the Bidder will execute the formal contract within fifteen days and deliver a Surety Bond or Bonds to the City Clerk. The Bid Security, in the form of certified check, cashier's check, cash, or Bid Bond, which is five percent of the total bid, including sales tax, if applicable, is to become the property of the City in the event the contract and bond are not executed within the time set forth above, as liquidated damages for the delay and additional expense to the City caused thereby. Bidder agrees to perform all work described in the contract manual and listed in the proposal for the sum of ($ ) (amount to be in both words andfigures to agree with total amount of bid above). Respectfully submitted: By: Title: (Seal - if bid is by corporation) The Bidder agrees to complete all work awarded to him within the time limit previously stated. Further stipulations on bid, if any: Receipt of Addendum Number through is hereby acknowledged. If written notice of the acceptance of this bid is mailed, telegraphed or delivered to the undersigned within sixty (60) days after the date of the bids, or at any time thereafter before this bid is withdrawn, the undersigned agrees that (he) (she) (they) will execute and deliver a contract, in the form attached hereto as required by the contract manual, in accordance with the bid as accepted, and that (he) (she) (they) will give payment and performance bonds as specified with good and sufficient surety or sureties, all within fifteen days (unless a longer period is allowed) after the prescribed forms are presented to (him) (her) (them) fo r signature. Enclosed is security as required consisting of certified check or bid bond) in the amount of less than five percent (5%) of the total bid, including sales tax, if applicable. (cashier's check, which amount is not The party by whom this bid is submitted and by whom the contract will be entered into in event the award is made to him is a corporation/partnership/individuaI (indicate which), doing business at to which address notice of acceptance should be sent. P-5 IContractor's Registration No. (UBI No.) Legal Name of Person, Firm or Corporation By: Title: ME, FORM OF BID BOND Herewith find deposit in the form of a (state whether certified check, cashier's check or bid bond) for the amount of I which amount is not less than five percent of the total bid, including sales tax. NEITHER PERSONAL CHECK NOR CASH WILL BE ACCEPTED AS A BID BOND. Signature BID BOND KNOW ALL MEN BY THESE PRESENTS: That we, , as Principal, and as Surety, are held and firmly bound unto the City of Edmonds as Obligee, in the penal sum of for the payment of which the Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The Condition of this obligation is such that if the Obligee shall make award to the Principal for the construction of the Civic Center Skateboard Park, City of Edmonds, Washington, according to the terms of the proposal or bid made by the Principal therefore and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award, and shall give bond for the faithful performance thereof with Surety, or Sureties, approved by the Obligee; or, if the Principal shall in case of failure to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and void; otherwise, it shall be, and remain in full force and effect, and the Surety shall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of this bond. SIGNED, SEALED AND DATED THIS DAY OF 20 Received return of deposit in the sum of Date: By: PRINCIPAL By: SURETY Signature: MW CITY OF EDMONDS ENGINEERING DEPARTMENT NON -COLLUSION AFFIDAVIT STATE OF WASHINGTON) )ss COUNTY OF SNOHOMISH) being first duly sworn, on (his) (her) oath, says that (he) (she) is the owner of and that the bid above submitted is a genuine and not a sham or collusive bid, or made in the interest or on behalf of any person not therein named; and he further says that the said bidder has not directly or indirectly induced or solicited any bidder on the above work or supplies to put in a sham bid, or any other person or corporation to refrain from bidding; and that said bidder has not in any matter sought by collusion to secure to (himself) (herself) as an advantage over any other bidder or bidders. SIGNATURE Subscribed and sworn to before me this day of 520 Notary Public in and for the State of Washington, residing at NCA-1 CERTIFICATION OF EQUAL EMPLOYMENT OPPORTUNITY REPORT Certification with regard to the performance of previous contracts or subcontracts subject to the Equal Opportunity clause and the filing of required reports. The bidder, , proposed contractor, hereby certifies that (he) (she) has has not participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that (he) (she) has , has not - . filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a federal government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. Company By: Title: Date: Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally, only contracts or subcontracts of $ 10,000 or under are exempt.) Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations. Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7 (b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. EOR-1 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED1 NAMED ABOVE FOR THE. POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. [LTOR TYPE OF INSURANCE POUCYNUMBER POUCY-EFFECTFVE I POLICY EXPIRATION I I I DATE(MMMOA-4 IYATE (MM/001M LIMITS GENERAL LIABILITY COMMERCIAL GENERAL LIABILITY --] CLAIMS MADE FIOCCUR OWNER'S & CoNTRACrofrs PROT AUTOMOBILE LIABILITY ANY AUTO ALL OWNED ALITOS SCHEDULED ALMOS HIREDAUTOS NON -OWNED AUTOS GGREGA TE PRODU S - COMP P AGG PERSONAL JURY OGENERALA EACH OCCURRENCE ff FIRE DAMAGE ( Any one fire) $ mED ExP (Anyone pemon) $ COMBINED SINGLE LIMIT —�DILY INJURY BODILY INJURY (Per person) $ 1 million BODILY INJURY (Per accident) $ PR E 0 PROPERTY DAMAGE P:7 D s I million s I million G A GARAGE R A G E UAJ31UTY L A N Y ANY AUTO A < JO 14LY AUTO,01ALY - EAAcCIDENT EWA S s Y. OTHER THANAUTO ONLY. 7 1 H ACCIDENT S AGGREGATE $ E EXCESS CE L 1A LIABILITY U U M MBRELLA FORM - TH 0 OTHER THAN UMBRELLA FORM EACH OCCURRENCE $ AGGREGATE S S C WORKERS COMPENSATION AND , Z EMPLOYERS' LIABILITY 0 E THE PROPRIETORP tNCL PARTNERVE PARTNERSIEXECUTIVE ' E PROPRI RF- 0 "CER, OFFICERS A EXCL .T" OTHER —7 WC S3TAjThU- ]:--TI IF-�- OTT I I TOR 'LIMITS ER EL EACH ACCIDENT EL DtSEASE - POLICY LIMIT $ EL DISEASE - EA EMPLOYEE $ :15CRIPTION OF OPERATIONSfLOCATtONSIVEHICLESISPECIAL ITEMS The City of Edmonds, its officers, agents, and employees are named as additional insured with respect to the (name specific project). City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Should any of the above described policies be cancelled or reduced as to coverage before the expiration date thereof, the issuing insurer will mail 30 days written notice to the certificate holder(s) narn4to —the left by certified mail. AUTHORIZED REPRESENTATIVE State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, workers'wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. SNOHOMISH COUNTY Effective 08-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL $34.36 IM 5D BOILERMAKERS JOURNEY LEVEL $46.32 IC 5N BRICK AND MARBLE MASONS JOURNEY LEVEL $42.47 1M 5A CABINET MAKERS (IN SHOP) JOURNEY LEVEL $23.92 2M 5C CARPENTERS ACOUSTICAL WORKER $41.43 IM 5D BRIDGE, DOCK AND WARF CARPENTERS $41.33 1M 5D CARPENTER $41.33 1M 5D CREOSOTED MATERIAL $41.37 IM 5D DRYWALL APPLICATOR $41.31 im 5D FLOOR FINISHER $41.40 1M 5D FLOOR LAYER $41.40 im 5D FLOOR SANDER $41.40 IM 5D MILLWRIGHT AND MACHINE ERECTORS $42.27 IM 5D PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING $41.47 1M 5D SAWFILER $41.40 1M 5D SHINGLER $41.40 IM 5D STATIONARY POWER SAW OPERATOR $41.40 IM 5D STATIONARY WOODWORKING TOOLS $41.40 11M 50 CEMENT MASONS JOURNEY LEVEL $42.26 IM 5D DIVERS & TENDERS DIVER $85.75 11M 5D 8A DIVER TENDER $44.22 IM 5D DREDGE WORKERS ASSISTANT ENGINEER $42.02 IT 5D 8L ASSISTANT MATE (DECKHAND) $41.51 IT 5D 8L BOATMEN $42.02 IT 5D 8L ENGINEER WELDER $42.07 IT 5D 8L LEVERMAN, HYDRAULIC $43.64 IT 5D 8L MAINTENANCE $41.51 IT 5D 8L MATES $42.02 IT 5D 8L OILER $41.64 IT 5D 8L DRYWALL TAPERS JOURNEY LEVEL $41.14 1E 5P ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL $13.82 I Page 1 SNOHOMISH COUNTY Effective 08-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code ELECTRICIANS - INSIDE CABLE SPLICER $47.53 1D 5B CONSTRUCTION STOCK PERSON $19.10 1 D 5B JOURNEY LEVEL $44.29 1 D 5B ELECTRICIANS - MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLINE CONSTRUCTION CABLE SPLICER $52.38 4A 5A CERTIFIED LINE WELDER $47.88 4A 5A GROUNDPERSON $34.87 4A 5A HEAD GROUNDPERSON $36.75 4A 5A HEAVY LINE EQUIPMENT OPERATOR $47.88 4A 5A JACKHAMMER OPERATOR $36.75 4A 5A JOURNEY LEVEL LINEPERSON $47.88 4A 5A LINE EQUIPMENT OPERATOR $40.87 4A 5A POLE SPRAYER $47.88 4A 5A POWDERPERSON $36.75 4A 5A ELECTRONIC TECHNICIANS ELECTRONIC TECHNICIANS JOURNEY LEVEL $30.10 1 ELEVATOR CONSTRUCTORS MECHANIC $55.22 4A 6Q MECHANIC IN CHARGE $60.60 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 FENCE ERECTORS FENCE ERECTOR $14.00 FLAGGERS JOURNEY LEVEL $29.68 IM 5D GLAZIERS JOURNEY LEVEL $42.41 1H 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $44.68 is 51 HEATING EQUIPMENT MECHANICS MECHANIC $20.00 1 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $34.84 im 5D INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.07 INLAND BOATMEN CAPTAIN $37.34 1K 5B COOK $31.23 1K 5B DECKHAND $30.90 1K �5B ENGINEER/DECKHAND $33.65 1K 5B MATE, LAUNCH OPERATOR $35.32 1K 5B INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR $9.73 1 GROUT TRUCK OPERATOR $11.48 1 HEAD OPERATOR $12.78 1 Page 2 SNOHOMISH COUNTY Effective 08-31-06 Over PREVAILING Time Holiday Note Classification WAGE Code Code Code TECHNICIAN $7.63 1 TV TRUCK OPERATOR $10.53 1 INSULATION APPLICATORS JOURNEY LEVEL $41.27 1M 5D IRONWORKERS JOURNEY LEVEL $46.25 10 5A LABORERS ASPHALT RAKER $34.84 1M 5D BALLAST REGULATOR MACHINE $34.36 1M 5D BATCH WEIGHMAN $29.68 IM 5D BRUSH CUTTER $34.36 1M 5D BRUSH HOG FEEDER $34.36 1M 5D BURNERS $34.36 IM 5D CARPENTER TENDER $34.36 1M 5D CASSION WORKER $35.20 1M 5D CEMENT DUMPER/PAVING $34.84 1M 5D CEMENT FINISHER TENDER $34.36 1M CHANGE -HOUSE MAN OR DRY SHACKMAN $34.36 IM 5D CHIPPING GUN (OVER 30 LBS) $34.84 1M 5D CHIPPING GUN (UNDER 30 LBS) $34.36 1M 5D CHOKER SETTER $34.36 1M 5D CHUCKTENDER $34.36 1M 5D CLEAN-UP LABORER $34.36 1M 5D CONCRETE DUMPER/CHUTE OPERATOR $34.84 1M 5D CONCRETE FORM STRIPPER $34.36 1M 5D CONCRETE SAW OPERATOR $34.84 1M 5D CRUSHER FEEDER $29.68 1M 5D CURING LABORER $34.36 1M 5D DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED $34.36 1M 5D DITCH DIGGER $34.36 1M 5D DIVER $35.20 11M 5D DRILL OPERATOR (HYDRAULIC, DIAMOND) $34.84 11M 5D DRILL OPERATOR, AIRTRAC $35.20 IM 5D DUMPMAN $34.36 IM 5D EPDXY TECHNICIAN $34.36 IM 5D EROSION CONTROL WORKER $3436 IM 5D FALLER/BUCKER, CHAIN SAW $34.84 IM 5D FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, vAndow cleaning; NOT $27.36 1M 5D construction debris cleanup) FINE GRADERS $34.36 1M 5D FIRE WATCH $29.68 1M 5D FORM SETTER $34.36 1M 5D GABION BASKET BUILDER $34.36 IM 5D GENERAL LABORER $34.36 1M 5D GRADE CHECKER & TRANSIT PERSON $34.84 1M 5D GRINDERS $34.36 IM 513 GROUT MACHINE TENDER $34.36 1M 5D GUARDRAIL ERECTOR $34.36 11M 5D HAZARDOUS WASTE WORKER LEVEL A HAZARDOUS WASTE WORKER LEVEL B $35.20 $34.84 IM im 5D 5D HAZARDOUS WASTE WORKER LEVEL C $34.36 1M 5D HIGH SCALER $35.20 IM 5D Page 3 I I SNOHOMISH COUNTY Effective 08-31-06 Classification HOD CARRIER/MORTARMAN JACKHAMMER LASER BEAM OPERATOR MANHOLE BUILDER-MUDMAN MATERIAL YARDMAN MINER NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER PILOT CAR PIPE POT TENDER PIPE RELINER (NOT INSERT TYPE) PIPELAYER & CAULKER PIPELAYER & CAULKER (LEAD) PIPEWRAPPER POTTENDER POWDERMAN POWDERMAN HELPER POWERJACKS RAILROAD SPIKE PULLER (POWER) RE-TIMBERMAN RIPRAP MAN RODDER SCAFFOLD ERECTOR SCALE PERSON SIGNALMAN SLOPER (OVER 20") SLOPER SPRAYMAN SPREADER (CLARY POWER OR SIMILAR TYPES) SPREADER(CONCRETE) STAKE HOPPER STOCKPILER TAMPER & SIMILAR ELECTRIC, AIR & GAS TAMPER (MULTIPLE & SELF PROPELLED) TOOLROOM MAN (AT JOB SITE) TOPPER-TAILER TRACKLABORER TRACK LINER (POWER) TRUCK SPOTTER JUGGEROPERATOR VIBRATING SCREED (AIR, GAS, OR ELECTRIC) VIBRATOR VINYL SEAMER WELDER WELL -POINT LABORER LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER PIPE LAYER LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS Page 4 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code $34.84 1 M 5D $34.84 IM 5D $34.84 IM 5D $34.84 1M 5D $34.36 1 M 5D $35.20 1M 5D $34.84 1 M 5D $34.84 1M 5D $29.68 1 M 5D $34.84 1M 5D $34.84 1M 5D $34.84 1M 5D $35.20 1M 5D $34.84 1M 5D $34.36 1 M 5D $35.20 1 M 5D $34.3� 1 M 5D $34.84 1M 5D $34.84 1 M 5D $35.20 1 M 5D $34.36 1 M 5D $34.84 1 M 5D $34.36 1 M 5D $34.36 1 M 5D $34.36 1 M 5D $34.84 IM 5D $34.36 IM 5D $34.84 1 M 5D $34.84 1 M 5D $34.36 1 M 5D $34.36 1 M 5D $34.84 1M 5D $34.84 im 5D $34.36 1M 5D $34.36 IM 5D $34.36 1M 5D $34.84 1M 5D $34.36 1M 5D $34.84 1M 5D $34.36 1M 5D $34.84 1M 5D $34.36 1 M 5D $34.36 1 M 5D $34.84 1 M 5D $34.36 1 M 5D $34.84 1M 5D $12.66 $10.58 SNOHOMISH COUNTY Effective 08-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code LANDSCAPING OR PLANTING LABORERS $9.63 1 LATHERS JOURNEY LEVEL $41.31 IM 5D METAL FABRICATION (IN SHOP) FITTER/WELDER $15.38 1 LABORER $9.79 1 MACHINE OPERATOR $8.84 1 PAINTER $9.98 1 MODULAR BUILDINGS JOURNEY LEVEL $9.00 1 PAINTERS JOURNEY LEVEL $32.73 2B 5A PLASTERERS JOURNEY LEVEL $41.23 IIR 5A PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $9.63 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $47.77 IG 5A POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $39.57 11M 5D 8L BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $42.35 11M 5D 8L BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $42.84 11M 5D 8L BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH $43.39 11M 5D 8L BACKHOES, (75 HP & UNDER) $41.93 1M 5D 8L BACKHOES, (OVER 75 HP) $42.35 1M 5D 8L BARRIER MACHINE (ZIPPER) $42.35 1M 5D 8L BATCH PLANT OPERATOR, CONCRETE $42.35 1M 5D 8L BELT LOADERS (ELEVATING TYPE) $41.93 im 5D 8L BOBCAT (SKID STEER) $39.57 1M 5D 8L BROOMS $39.57 1M 5D 8L BUMP CUTTER $42.35 IM 5D 8L CABLEWAYS $42.84 IM 5D 8L CHIPPER $42.35 IM 5D 8L COMPRESSORS $39.57 IM 5D 8L CONCRETE FINISH MACHINE - LASER SCREED $39.57 IM 5D 8L CONCRETE PUMPS $41.93 1M 5D 8L CONCRETE PUMP -TRUCK MOUNT WITH BOOM ATTACHMENT $42.35 1M 5D 8L CONVEYORS $41.93 11M 5D 8L CRANES, THRU 19 TONS, WITH ATTACHMENTS $41.93 1M 5D 8L CRANES, 20 - 44 TONS, WITH ATTACHMENTS $42.35 1M 5D 8L CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $42.84 1M 5D 8L JIB WITH ATACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $43.39 1M 5D 8L WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $43.96 1M 5D 8L WITH ATTACHMENTS) CRANES,A-FRAME, 10TONANDUNDER $39.57 1M 5D 8L CRANES, A -FRAME, OVER 10 TON $41.93 1M 5D 8L CRANES, OVER 300 TONS, OR 300'OF BOOM INCLUDING JIB WITH $44.52 im 5D 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE (20 - 44 TONS) $42.35 IM 5D 8L CRANES, OVERHEAD, BRIDGE TYPE (45 - 99 TONS) $42.84 1M 5D 8L CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $43.39 11M 5D 8L Page 5 SNOHOMISH COUNTY Effective 08-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code CRANES, TOWER CRANE UP TO 175* IN HEIGHT, BASE TO BOOM $43.39 11M 50 8L CRANES, TOWER CRANE OVER 175'IN HEIGHT, BASE TO BOOM $43.96 IM 5D 8L CRUSHERS $42.35 IM 5D 8L DECK ENGINEERIDECK WINCHES (POWER) $42.35 1M 5D 8L DERRICK, BUILDING $42.84 1M 5D 8L DOZERS, D-9 & UNDER $41.93 1M 5D 8L DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $41.93 1M 5D 8L DRILLING MACHINE $42.35 1M 5D 8L ELEVATOR AND MANLIFT, PERMANENT AND SHAFT -TYPE $39.57 1M 5D 8L EQUIPMENT SERVICE ENGINEER (OILER) $41.93 1M 5D 8L FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $42.35 1M 5D 8L FORK LIFTS, (3000 LBS AND OVER) $41.93 1M 5D 8L FORK LIFTS, (UNDER 3000 LBS) $39.57 IM 5D 8L GRADE ENGINEER $41.93 1M 5D 8L GRADECHECKER AND STAKEMAN $39.57 IM 5D 8L GUARDRAIL PUNCH $42.35 1M 5D 8L HOISTS, OUTSIDE (ELEVATORS AND MANLIFTS), AIR TUGGERS $41.93 IM 5D 8L HORIZONTAUDIRECTIONAL DRILL LOCATOR $41.93 IM 5D 8L HORIZONTAUDIRECTIONAL DRILL OPERATOR $42.35 1M 5D 8L HYDRALIFTS/BOOM TRUCKS (10 TON & UNDER) $39.57 IM 5D 8L HYDRALIFTS/BOOM TRUCKS (OVER 10 TON) $41.93 1M 5D 8L LOADERS, OVERHEAD (6 YD UP TO 8 YD) $42.84 IM 5D 8L LOADERS, OVERHEAD (8 YD & OVER) $43.39 1M 5D 8L LOADERS, OVERHEAD (UNDER 6 YD), PLANT FEED $42.35 1M 5D 8L LOCOMOTIVES, ALL $42.35 im 5D 8L MECHANICS, ALL $42.84 1M 5D 8L MIXERS, ASPHALT PLANT $42.35 IM 5D 8L MOTOR PATROL GRADER (FINISHING) $42.35 1M 5D 8L MOTOR PATROL GRADER (NON -FINISHING) $41.93 1M 5D 8L MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $42.84 1M 5D 8L OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $39.57 1M 5D 8L OPERATOR PAVEMENT BREAKER $39.57 1M 5D 8L PILEDRIVER (OTHER THAN CRANE MOUNT) $42.35 1M 5D 8L PLANT OILER (ASPHALT, CRUSHER) $41.93 1M 5D 8L POSTHOLE DIGGER, MECHANICAL $39.57 IM 5D 8L POWER PLANT $39.57 IM 5D 8L PUMPS,WATER $39.57 1M 5D 8L QUAD 9, D-10, AND HD-41 $42.84 1M 5D 8L REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $42.84 IM 5D 8L EQUIP RIGGER AND BELLMAN $39.57 1M 5D 8L ROLLAGON $42.84 1M 5D 8L ROLLER, OTHER THAN PLANT ROAD MIX $39.57 1M 5D 8L ROLLERS, PLANTMIX OR MULTILIFT MATERIALS $41.93 1M 5D 8L ROTO-MILL, ROTO-GRINDER $42.35 1M 5D 8L SAWS, CONCRETE $41.93 IM 5D 8L SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $42.35 IM 5D 8L OFF -ROAD EQUIPMENT (UNDER 45 YD) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING $42.84 IM 5D 8L OFF -ROAD EQUIPMENT (45 YD AND OVER) SCRAPERS, CONCRETE AND CARRY ALL $41.93 1M 5D 8L SCREED MAN $42.35 1M 5D 8L Page 6 SNOHOMISH COUNTY Effective 08-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code SHOTCRETE GUNITE $39.57 1 M 5D 8L SLIPFORM PAVERS $42.84 IM 5D 8L SPREADER, TOPSIDE OPERATOR - BLAW KNOX $42.35 11M 5D 8L SUBGRADE TRIMMER $42.35 1M 5D 8L TOWER BUCKET ELEVATORS $41.93 Im 5D 8L TRACTORS, (75 HP & UNDER) $41.93 im 5D 81- TRACTORS, (OVER 75 HP) $42.35 IM 5D 8L TRANSFER MATERIAL SERVICE MACHINE $42.35 1M 5D 8L TRANSPORTERS, ALL TRACK OR TRUCK TYPE $42.84 1M 5D 8L TRENCHING MACHINES $41.93 1M 5D 8L TRUCK CRANE OILER/DRIVER (UNDER 100 TON) $41.93 1M 5D 8L TRUCK CRANE OILER/DRIVER (100 TON & OVER) $42.35 1 M 5D 8L TRUCK MOUNT PORTABLE CONVEYER $42.35 IM 5D 8L WHEEL TRACTORS, FARMALL TYPE $39.57 1 M 5D 8L YO YO PAY DOZER $42.35 1 M 5D 8L POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE $34.75 4A 5A SPRAY PERSON $33.00 4A 5A TREE EQUIPMENT OPERATOR $33.43 4A 5A TREE TRIMMER $31.10 4A 5A TREE TRIMMER GROUNDPERSON $23.43 4A 5A REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC $47.77 1G 5A RESIDENTIAL BRICK & MARBLE MASONS JOURNEYLEVEL $30.74 1 RESIDENTIAL CARPENTERS JOURNEY LEVEL $19.91 RESIDENTIAL CEMENT MASONS JOURNEY LEVEL $14.00 RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL $41.14 IIE 5P RESIDENTIAL ELECTRICIANS JOURNEY LEVEL $30.91 RESIDENTIAL GLAZIERS JOURNEY LEVEL $27.89 1H 5G RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL $17.59 RESIDENTIAL LABORERS JOURNEY LEVEL $13.61 RESIDENTIAL PAINTERS JOURNEYLEVEL $12.00 RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL $22.95 RESIDENTIAL REFRIGERATION & AIR CONDITIONING JOURNEY LEVEL $27.93 1G 5A RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $32.09 1E 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $33.76 1B 5A Page 7 SNOHOMISH COUNTY Effective 08-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $29.51 1B 5C RESIDENTIAL TERRAZZO/TILE FINISHERS JOURNEY LEVEL $21.60 ROOFERS JOURNEY LEVEL $35.78 1R 5A USING IRRITABLE BITUMINOUS MATERIALS $38.78 1R 5A SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $49.97 1E 6L SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL $26.17 SIGN MAKERS & INSTALLERS (NON -ELECTRICAL) JOURNEY LEVEL $34.36 1M 5D SOFT FLOOR LAYERS JOURNEY LEVEL $33.76 1B 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $7.63 1 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $51.84 1H 5C STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $13.23 1 SURVEYORS CHAIN PERSON $9.35 1 INSTRUMENT PERSON $11.40 1 PARTY CHIEF $13.40 TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $22.38 TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $29.89 2B 5A HOLE DIGGERIGROUND PERSON $16.81 2B 5A INSTALLER (REPAIRER) $28.68 2B 5A JOURNEY LEVEL TELEPHONE LINEPERSON $27.82 2B 5A SPECIAL APPARATUS INSTALLER 1 $29.89 2B 5A SPECIAL APPARATUS INSTALLER 11 $29.30 2B 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $29.89 2B 5A TELEPHONE EQUIPMENT OPERATOR (LIGHT) $27.82 2B 5A TELEVISION GROUND PERSON $15.96 2B 5A TELEVISION LINEPERSON/INSTALLER $21.17 2B 5A TELEVISION SYSTEM TECHNICIAN $25.15 2B 5A TELEVISION TECHNICIAN $22.64 2B 5A TREE TRIMMER $27.82 2B 5A TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL $40.33 1B 5A TILE, MARBLE & TERRAZZO FINISHERS FINISHER $34.16 1B 5A TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $34.90 1K 5A TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) $39.04 1T 5D ASPHALT MIX (OVER 16 YARDS) $39.62 1T 5D DUMPTRUCK $37.94 1 R 5A DUMP TRUCK & TRAILER $38.52 1 R 5A Page 8 8L 8L SNOHOMISH COUNTY Effective 01-31-06 (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code Code Code OTHER TRUCKS $38.52 1R 5A TRANSIT MIXER $28.75 20 61 WELL DRILLERS & IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER $17.05 '1 OILER $13.93 1 WELL DRILLER $19.01 1 I I I I I Page 9 BENEFIT CODE KEY - EFFECTIVE 08-31-06 OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A* ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. C. T14E FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY. AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. D. THE FIRST TWO (2) HOURS BEFORE OR AFTER A FIVE - EIGHT (8) HOUR WORKWEEK DAY OR A FOUR - TEN (10) HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL ADDITIONAL HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDAYS S14ALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. E. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-RALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. F. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. G. THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE 140URLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-14ALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. J. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (10) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. L. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. M. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID AT ONE AND ONE-RALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. N. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. 0. THE FIRST TEN (10) HOURS WORKED ON SATURDAY S14ALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE (12) HOURS, MONDAY THROUGH FRIDAY, AND AFTER TEN (10) HOURS ON SATURDAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. P. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID AT ONE AND ONE- HALF TIMES THE.HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE I HOURLY RATE OF WAGE. I - 1 BENEFIT CODE KEY - EFFECTIVE 08-31-06 -2- IF] THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN (10) HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. S. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-14ALF TIMES THE HOURLY RATE OF WAGE. ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. T. ALL HOURS WORKED ON SATURDAYS, EXCEPT MAKE-UP DAYS, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED AFTER 6:OOPM SATURDAY TO 6:OOAM MONDAY AND ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLYRATE OF WAGE. V. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. W. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. D. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-14ALF TIMES THE HOURLY RATE OF WAGE. E. ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS (EXCEPT LABOR DAY) S14ALL BE PAID AT ONE AND ONE- 14ALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. G. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY. H. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-14ALF TIMES THE HOURLY RATE OF WAGE. 1. ALL HOURS WORKED ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. J. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-14ALF TIMES THE HOURLY RATE OF WAGE, INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. BENEFIT CODE KEY - EFFECTIVE 08-31-06 -3- 2. K. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY. M. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. 0. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. P. THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT 8) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. 4A. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. HOLIDAY CODES 5. A. HOLIDAYS: NEW YEAR!S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). B. HOLIDAYS: NEW YEAR!S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSG WING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8). C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). D. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). E. HOLIDAYS: NEW YEAR!S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, PRESIDENTIAL 11 ELECTION DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). F. HOLIDAYS: NEW YEAR!S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (11). G. HOLIDAYS: NEW YEAWS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7). H. HOLIDAYS: NEW YEAR!S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS (6). 1. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6). J. HOLIDAYS: NEW YEAR!S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (7). N. HOLIDAYS: NEW YEAR!S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9). P. HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). Q PAID HOLIDAYS: NEW YEAR!S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, T14ANKSGIVING DAY, AND CHRISTMAS DAY (6). R. PAID HOLIDAYS: NEW YEAR!S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, T14ANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (7 1/2). S. PAID HOLIDAYS: NEW YEAR!S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (7). T. PAID HOLIDAYS: NEW YEAR!S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY BEFORE OR AFTER CHRISTMAS (10). BENEFIT CODE KEY - EFFECTIVE 08-31-06 -4- I 5. V. PAID HOLIDAYS: SIX (6) PAID HOLIDAYS. W. PAID HOLIDAYS: NINE (9) PAID HOLIDAYS. X. HOLIDAYS: AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080 HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8). Y. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8). Z. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). 6. A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). B. PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE'S DAY, AND CHRISTMAS DAY (9). C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). D. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY BEFORE OR THE DAY AFTER CHRISTMAS DAY (9). F. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (11). 1. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). L. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (8) Q PAID HOLIDAYS: NEW YEAWS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY (8). UNPAID HOLIDAY: PRESIDENTS'DAY. T. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE. DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). U. HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAWS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY, CHRISTMAS DAY (9). V. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (9). W. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAWS DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY (10). X. PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR!S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (11). NOTE CODES 8. A. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50'TO 100'- $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 175'- $2.25 PER FOOT FOR EACH FOOT OVER 100 FEET BENEFIT CODE KEY - EFFECTIVE 08-31-06 -5- OVER 175'TO 250'- $5.50 PER FOOT FOR EACH FOOT OVER 175 FEET OVER 250'- DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS T14AN THE SCALE LISTED FOR 250 FEET C. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50' TO 100'- $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 150'- $1.50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150'TO 200'- $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 200'- DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL $1.00 PER HOUR. L. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $0.75, LEVEL B: $0.50, AND LEVEL C: $0.25. M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A & B: $1.00, LEVELS C & D: $0.50. N. WORKERS ON RAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $1.00, LEVEL B: $0.75, LEVEL C: $0.50, AND LEVEL D: $0.25. PART 11 CONTRACT FORMS Agreement Performance and Payment Bond AGREEMENT THIS AGREEMENT AND CONTRACT, made and entered into at Edmonds, Washington, this day of 9 2006, by and between the CITY OF EDMONDS, a municipal corporation, hereinafter called the CITY and hereinafter called the CONTRACTOR. WITNESSETH: THAT WHEREAS, the CITY has heretofore caused to be prepared certain plans, specifications, including Invitation to Bid, Addendum Proposal, Agreement, Performance and Payment Bond, all attached hereto, for its project entitled Civic Center Skateboard Park, and the CONTRACTOR did on the day of ', 2006 file with the CITY a proposal to furnish equipment, labor, material, supplies and appurtenances for the construction of said project as set forth in the plans and specifications, and agreed to accept as payment therefore the sums fully stated and set forth in the proposal; and WHEREAS, the said plans and specifications and proposal full and accurately set forth and describe the terms and conditions upon which the CONTRACTOR proposes to furnish said equipment, labor, material, supplies and appurtenances and perform said work, together with the manner and time of furnishing same; IT IS THEREFORE AGREED, that in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows: The CONTRACTOR shall do all work and furnish all labor, materials, supplies, and equipment for Civic Center Skateboard Park in accordance with and as described in the attached plans and specifications and the Standard Specifications, which are by this reference incorporated herein and made a part hereof, and shall perform and make alterations, in or additions to, the work provided under this contract and every part thereof Work shall start on the day specified on the notice to proceed and be completed in 60 calendar days. If said work is not completed in the time specified, the Contractor agrees to pay to the City liquidated damages for each and every day said work remains uncompleted after expiration of the specified time. Liquidated damages shall be calculated using the formula in Standard Specifications Section 1-08.9, "Liquidated Damages". The CONTRACTOR shall provide and bear the expense of all equipment, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the CITY OF EDMONDS. I A- I I I The CITY hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the ternis and conditions herein contained; and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or lump sum prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. That, in consideration of faithful compliance with the terms and conditions of this Agreement, the City shall pay to the Contractor, at the times and in the manner provided in said specifications, the total sum of ($ which sum is subject, however, to increase or decrease in such proportion as the quantities named in I said proposal are so changed, all as in said specifications and proposal provided. IN ADDITION TO THE INCORPORATED TERMS, PLANS AND CONDITIONS, the Contractor specifically agrees and stipulates as follows: II . The Contractor shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, losses or liability, including attorney's fees, arising I from injury or death to persons or damage to property occasioned by an act, omission or failure of the Contractor, its officers, agents, and employees, in performing the work required by this agreement (contract). With respect to the performance of this agreement and as to any claim against the City, its officers, agents and employees, the Contractor expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees and agrees that the obligation to indemnify, defend and hold harmless provided for in this paragraph extends to any claim brought by or on behalf of any employee of the Contractor. This waiver is mutually negotiated by the parties. This paragraph shall not apply to damage resulting from the sole negligence of the City, its agents and employees. To the extent any of the damages referenced by this paragraph were caused by or resulted ftom the concurrent negligence of the City, its agents or employees, this obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Contractor, its officers, agents and employees. 2. Provision for Cost and Attome3�s Fees. In the event that any suit is commenced by the City to enforce the terms of this contract or any bond securing the obligations of this contract, the City shall be entitled to recover, in addition to any other sums due and owing hereunder, its costs incurred in such enforcement, such costs to include, but not be limited to, reasonable attorney's fee. A-2 I IN WITNESS WHEREOF, three identical counterparts of this contract, each of which shall, for all purposes be deemed an original thereof, have been duly executed by the parties hereinbefore named on the day and year in the Agreement first above written. CITY OF EDMONDS: By GARY HAAKENSON, MAYOR ATTEST: SANDRA S. CHASE, CITY CLERK APPROVED AS TO FORM: CITY ATTORNEY SOLE PROPRIETOR CONTRACTOR: By Sole Proprietor doing business as: STATE OF )ss COUNTY OF On this day of � 20 _ before me personally appeared and on his/her oath swore that he/she is an owner or duly authorized agent of the firm that executed the within and foregoing instrument and is duly authorized to execute said instrument on behalf of the partnership as its free act and deed. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. Notary Public in and for the State of Washington, residing at A-3 PARTNERSHIP CONTRACTOR: STATE OF )ss COUNTY OF By Partner or authorized agent for: (Name of partnership) On this day of 5 20 _ before me personally appeared and on his/her oath swore that he/she is a partner or duly authorized agent of the partnership that executed the within and foregoing instrument and is duly authorized to execute said instrument on behalf of the partnership as its free act and deed. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. Notary Public in and for the State of Washington, residing at A-4 CORPORATION CONTRACTOR: (PLACE CORPORATE SEAL HERE) By _ Title STATE OF )ss COUNTY OF On this - day of 20_, before me personally appeared known to be the (president, vice president, secretary, treasurer, or other authorized officer or agent, as the case may be) of the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and upon oath stated that he/she was authorized to execute said instrument and that the seal affixed hereto is the corporate seal of said corporation. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. Notary Public in and for the State of Washington, residing at A-5 I IPERFORMANCE AND PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS: That whereas the CITY OF EDMONDS, WASHINGTON, has awarded , hereinafter designated as the "Principal", a contract for the construction of the Civic Center Skateboard Park, which consists of Invitation to Bid, referenced Standard Specifications, Technical Specifications, Plans, Accepted Proposal and Agreement, all as hereto attached and made a part hereof-, and whereas, said principal is required under the terms of said contract to furnish a bond for the faithful performance and payment of said contract. NOW, THEREFORE, we the principal and I a corporation, organized and existing under and by virtue of the laws of the State of I and duly authorized to do business in the State of Washington, as surety, are held and firmly bound unto the CITY OF EDMONDS and the State of Washington, for and in behalf of the City of Edmonds for the Civic Center Skateboard Park in the sum of ($ ) lawful money of the United States, for the payment of which sum well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly, severally, and firmly by those presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above bonded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements of any and all duly authorized modifications of said contract that may hereafter be made, at the time and in the manner therein specified, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shall supply such person or persons or subcontractors with provisions and supplies for the carrying on of such work, on his or their parts, and shall indemnify and save harmless the CITY OF EDMONDS, WASHINGTON, its officers and agents, and shall further save harmless and indemnify said CITY OF EDMONDS, WASHINGTON from any defect or defects in any of the workmanship or materials entering into any part of the work or designated equipment covered by said contract, which shall develop or be discovered within one (1) year after the final acceptance of such work, then this obligation shall become null and void, otherwise, it shall be and remain in full force and effect, provided that the liability hereunder for defects in materials and workmanship for a period of one year after the final acceptance of such work. THE SURETY, for value received, further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder of the specifications accompanying the same shall in any way affect its obligation on this bond, and the Surety does hereby waive notice of any change, extension of time, alterations or additions to the terms of the contract or the work or to the specifications. The Surety hereby agrees that modifications and changes may be made in the terms and provisions of the aforesaid contract without notice to the Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this Performance Bond in a like amount, such increase, however, not to exceed twenty-five percent (25%) of the original amount of this bond without the consent of the Surety. I I IN WITNESS WHEREOF, this instrument is executed in three counterparts, each of which shall be deemed an original, this _ day of 2006. Principal By Title TWO WITNESSES: ATTEST (if corporation): Surety By _ Title Its Address of local office and agent of surety company is: APPROVED AS TO FORM: City Attorney NOTE: Date of bond must not be prior to date of contract. If Contractor is partnership, all partners should execute bond. PART III ISPECIAL PROVISIONS / GENERAL REQUIREMENTS I I I 11 I I I I I SPECIAL PROVISIONS 1. Scope of Project — The work consists of furnishing all labor, equipment and materials necessary to construct the Civic Center Skateboard Park located in the Civic Center in the vicinity of Sixth Avenue North and Sprague Street in Edmonds, Washington. The Contractor will be required to construct this project in two phases. The first phase will include the excavation and disposal of all required materials, the construction of all concrete and related appurtenances including the detention system and the installation of fence post sleeves. At the completion of this work, the Contractor will be required to leave the site for approximately ten days to allow another contractor to install the modular skateboard components. Following the installation of the components, the second phase of the project will commence. The Contractor will return to install the fence system as specified. The Contractor shall perform all operations in strict accordance with the specifications and drawings and shall be subject to the terms and conditions of the contract. 2. Work Hours — Work hours shall be from 7:00 AM to 6:00 PM Monday through Friday. No work shall be done at night or on weekends or City -observed holidays without prior approval from the City Engineer. 3. Protecting the Public — The Civic Center Playfield is heavily used by the public. In addition, this project site is located contiguous to the Edmonds Boys and Girls Club. The Contractor is required to take extreme measure to assure that this work environment remains safe at all times. .Flaggers and spotters must be utilized whenever materials are delivered or removed from the construction site. 4. Contract Duration — The Contractor shall be given 60 calendar days to complete the project. 5. Pre -bid Site Visit — A mandatory pre -bid site visit will be held on October 10, 2006 at 2:00 PM at the project site. All bidders shall be required to attend. Any bid received from a bidder who did not attend the pre -bid site visit may be rejected at the sole discretion of the City. Contact Jim Roberts (425-771-0220) or Rich Lindsay (425-771-0230) with questions regarding the pre -bid site visit. I SP-1 GENERAL REQUIREMENTS 1. Preconstruction Conference — The Contractor shall meet with the City in a preconstruction meeting to discuss the Contractor's construction program and also to provide the City with their plan to control traffic. Work shall not commence until the schedule and traffic control plan have been approved by the City. 2. Permits — City of Edmonds building and grading permits will be issued to the Contractor at no charge. 3. Verification — The Contractor shall verify all measurements and notify the City Representative of any known discrepancies in the contract documents prior to the start of construction. All layouts shall be performed by the City Representative. 4. Traffic Control — Local traffic shall be maintained. Access to all properties shall be provided at the end of each day. Construction signing shall be specified and in accordance with the Manual on Uniform Traffic Control Devices (MUTCD). All traffic control personnel, signs and barricades required by construction activities for the control of traffic shall be maintained by the Contractor. This shall apply to detours and traffic control, both within and outside the limits of the project. 5. Cleanup and Street Sweeping — All street sweeping shall be the Contractor's responsibility. Any street sweeper used must be capable of capturing all debris. Upon completion of the work each day, the Contractor shall clean the right-of-way and all properties on which he has. operated in the construction of this project, including removing all discarded materials, rubbish and debris and dust control by water -spraying the Job site. The Contractor shall do all things necessary to put the right-of-way and the project in a safe and orderly condition. 6. Removal of Existin Materials — The Contractor is responsible for the removal and appropriate disposal of all excavated materials. 7. Temporary Construction Fence — Under the direction of the City's Project Manager, the Contractor will be required to install approximately 750 LF of six-foot high temporary fence. This fence must be locked at the end of each work day. 8.. Concrete Slab — The Contractor is required to provide all concrete materials with color impregnated into the concrete product. Use Cadman "Antique Mix" or approved equivalent. Concrete to contain fiber mesh to limit surface cracking. 9. Detention System — A detention system must be installed per the attached plan parameters. The system must be installed to parallel the north edge of the concrete stab. 10. Perimeter Fence — All fence posts to be black vinyl coated Schedule 40 material. All fencing to be eight -gauge galvanized fabric. 11. Crushed Base Rock — Note that the base rock for this project is 5/8-inch Fii�PA (not 5/8-inch minus). SP-2 PART IV MODIFICATIONS TO STANDARD SPECIFICATIONS 1. Modifications to Division 1 — General Requirements 2. Modifications to Division 2 - Earthwork 3. Modifications to Divisions 3 through 8 4. Modifications to Division 9 — Materials 5. Material Modifications — Divisions 7, 8 and 9 STANDARD SPECIFICATIONS CITY OF EDMONDS MODIFICATIONS DIVISION I — GENERAL REQUIREMENTS The Standard Specifications for the Municipal Public Works Construction, as prepared by the Washington Department of Transportation 2006 Standard Specifications for Road, Bridge, and Municipal Construction (English Version), hereinafter referred to as "Standard Specifications," hereby by references are made a part of this contract, except as amended and/or supplemented by the "Special Provisions." Copies of the Standard Specifications are available for review and inspection at the office of the Engineer. Copies of the Standard Specifications may be purchased from: Department of Transportation Transportation Building Attention: Precontract 21110 Olympia, WA. 98504 (360) 753-7252 AMENDMENTS: Modifications and Clarifications to Division I of the General Requirements of the Standard Specifications: 1-01 DEFINITIONS AND TERMS Ci Add: City shall mean City of Edmonds, Washington Contracting Agenc Add: Contracting agency shall mean City of Edmonds, Washington Departing - Department of Transportation Add: Definition shall also mean City where applicable Engineer Insert: The City Engineer, acting directly or through his authorized representative. Secreta!y - Secretary of Transportation Substitute: City for Secretary State Substitute: City for State where applicable Da A day or contract day shall mean a calendar day linport or I!Eport Material Insert: Materials that are imported from offlite and from approved sources. 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Delete 1-02.1 1-02.2 Plans and Specifications Delete and insert: Copies of plans and specifications (bidding documents) will be on file in the office of the City Engineer. Contract documents (bidding documents) may be obtained at the City at the cost defined in the Invitation to Bid. After award of contract, three (3) sets of plans and specifications will be issued without charge. All additional copies of the specifications shall be at $25.00 and $5.00 for each design drawing. 1-1 1-02.3 Estimated Quantities Add: The City reserves the right to establish bid ceilings in the proposal, and after contract award, delete an entire bid item at the bid price and decrease or increase the bid items listed below, which normally represent less than twenty (20) percent of the total bid price, by any amount at the bid price. Bid item list: Imported pipe base material Imported pipe zone material Native backfill material Imported backfill material Patching or temporary patching Curb and gutter Sidewalks Utility adjustments (manholes, valve boxes, catch basins, monuments) 1-02.5 Proposal Forrns Insert: Proposal Forms are bound in the Contract Document. 1-02.8 Non -Collusion Certificate Add: Non -Collusion Affidavit (Certificate) required 1-02.13(ta) Delete 1-02.14 Disqualifications of Bidders Add: (11) The Bidder's Statement of Qualifications is found to be in error, questionable, or not in the best interest of the City. 1-03 AWARD AND EXECUTION OF CONTRACT 1-03.3 Execution of Contract Delete first paragraph and insert: The successful bidder shall sign and execute the contract within fifteen (15) days from the Notice of Award. The City shall execute a Notice to Proceed within ten (10) days after receipt of executed contract. The contract time shall begin ten (10) days from receipt of Notice to Proceed, the date specified in the Notice to Proceed as specified in the Special Provisions, or the first day of work by the bidder (contractor), whichever comes first. A day of work shall mean any activity, including delivery of equipment or materials. 1-04 SCOPE OF WORK 1-04.4 Changes Add: 1-02.3 (see previous paragraph) 1-04.6 Increased or Decreased Quantities Add: 1-02.3 (see above) 1-04.8 Progress Estimates and Payments Add: Progress payments shall be signed by the Contractor, City Representative and City Engineer, to be considered approved and valid. Payments shall be for work completed by the end of each month. Estimating ahead will not be allowed. Payments by the City will normally be made within ten (10) days from date of approval. 1-05 CONTROL OF WORK 1-05.3 Plans and Workiniz Drawinjzs Add: The Contractor shall prepare working drawings when specified in the Special Provisions. 1-2 1-05.5 Add: Construction Stakes The Engineer will provide on the plans the location of the survey control and bench marks used for the design. The Contractor shall provide all construction staking. The Contractor shall provide reference points for all of the existing monumentation within the project boundary under the supervision of a licensed land surveyor retained by the Contractor. All monurnentation shall be replaced by the Contractor's licensed land surveyor prior to final acceptance. The Contractor and/or his surveyor shall work closely with the Engineer in establishing grades, alignments, and resolving any discrepancies. Unless otherwise specified in the Special Provisions, the Contractor shall detennine if a licensed surveyor is needed for field staking. The Contractor shall field station the project as shown on the plans. All subgrades and top courses for street and road projects shall be "blue top" at a minimum of 50-foot stations. All surveying and construction staking shall be considered incidental to the Contractor's bid proposal. The City reserves the right, after the Contractor has field established final grades, to require the Contractor to have the grades checked by the Contractor's licensed surveyor or the City's surveyor. If the grades are determined to be incorrect, the Contractor shall pay all costs. If the grades are found to be correct, the City will pay for the Contractor's direct cost for the surveyor and an additional fifteen (15) percent of the direct cost to cover overhead, profit and any inconveniences or delays resulting from checking the finished grades. 1-05.6 Inspections of Work and Materials Add: It is understood by the Contractor that the Engineer or his representative will not be on the job site full- time, and the City will rely on the Contractor to follow the contract plans and specifications, schedule, and request inspections at the appropriate times as required herein and testing required in 1-06.2. The Engineer will make an effort to provide inspections on short notice, but if unable to, the requirements for proper notice shall apply. The project schedule prepared by the Contractor and approved by the Engineer shall also be used as a guide for the Contractor to schedule inspections. The Contractor shall provide 24 hours written request for inspections and 48 hours for testing, but in no case, shall there be more than 72 hours notice. The request shall state the date and approximate time the inspection or test is requested. If the Contractor establishes a history of requesting inspections and/or tests and is not prepared or ready for said inspection test, the Contractor shall pay the costs for all improperly scheduled requests. Three (3) improper requests for inspections or tests shall constitute a history. At the beginning of the project, or each major construction operation, the Contractor shall meet with the Engineer and establish, in the field, the product which meets the specifications for survey staking and control, pavement cuts, utility trenches, trench bedding, patches, curb and gutter alignment, grade and finish, sidewalk finish, paving finish and any other activities determined by the Engineer to be important to the project. No major amount of work shall proceed until this is established. Approximately 100 feet of work will be considered as the baseline measure. It is understood the intent of this requirement is to have as a reference at the beginning of the project or activity to be used for comparison throughout the project. This does not waive the Contractor's requirements in the specifications for quality control or ma ' terials used. Inspections and testing, as required in 1-06.2, are mandatory prior to backfilling any utility trenches; placing base course and top course for streets; paving, and placing sidewalks, curbs and gutters. The Engineer shall be present for all testing of utilities. Scheduling for all surveys and associated delays shall be considered incidental to the project. 1-05.8 Add: Protection of Work and Utili!y Trenches It is mutually understood that the weather patterns in the City consist of large amounts of annual rainfall. The Contractor can obtain precipitation records from the National Climatic Data Center for review. The Contractor shall include in his bid prices and work schedule, the necessary means to protect the work and cleanup measures. Materials placed or installed and then damaged or contaminated by rainfall requiring rejection by the Engineer shall be replaced at the Contractor's expense. Materials which are stockpiled, at the site, including trench backfill materials, shall also be protected and replaced at the Contractor's expense if contaminated by the weather and determined to be unusable. Cold patching or rock used to protect utility trenches from the weather, shall be considered incidental to the project and bid proposal items. 1-3 1-05.1 la Substantial Completio Add: The Engineer may issue a certificate of Substantial Completion when the project is substantially completed and in use by the City. Substantial completion shall start the warranty period for work accepted in the statement and stops the contract time, but is not a notice of project acceptance and does not release the Contractor from making immediate repairs for work found to be defective after issuance of the statement which would be required for release of retainage. Raising to final grade of all utility castings and final patching work must be completed prior to issuance of substantial completion. 1-05.12 Final Acceptance Insert: Upon satisfactory completion of all contract requirements, the City will approve Final Acceptance. A forty-five (45) day appeal period will begin the day after Final Acceptance. The retainage shall be released after the appeal period and in accordance with Washington State RCW's. (See 1-09.9a Retainage) 1-06 CONTROL OF MATERIALS 1-06.2(l) Sa!nples and Tests for Acceptance Add: The City reserves the right to have field testing of materials, including moisture content and compaction, at its discretion. The City will pay all testing cost except as stipulated below for City constructed projects. Testing costs for work under private contracts shall be paid by the Contractor or developer, not the City. The Contractor shall schedule, in his work, testing required in the specifications and the minimum tests listed below to be performed by the City or its testing company. The Contractor shall provide the equipment and labor provide test sites and/or pits (holes) at the locations and depths selected by the Engineer. If a test fails, additional tests will be performed to establish the limits of failure. After any rejected work is done, the testing procedure shall be implemented again. If a test fails again, additional tests will be performed to identify the area of failure at the Contractor's expense. The testing and rework will be done at the cost of the Contractor until the work is accepted by the Engineer. All costs to the Contractor associated with testing, including delays and scheduling, shall be incidental to the bid price(s). 1 1-06.2(2) Concrete pours: Two (2) slump and four (4) cylinders per ten (10) cubic yards Asphalt: Two (2) sample compaction tests per street unless otherwise directed by the Engineer Base rock compaction: Two (2) plus one (1) per 300 square feet or two (2) tons Embank. compaction: Two (2) plus one (1) per one (1) c. y. (allow 48 hrs for proctor test) if native material is used Trench compaction: Two (2) plus one (1) per fifty (50) feet (allow 48 hours for proctor test) if native material is used The following compaction requirements of the test method shown shall be met: Asphalt - 98% maximum field compaction or 91% AASHTO T230-68 (Rice) Base rock - 95% ASTM D 1557 or 95% WSDOT test Method No. 606 Trench pipe zone (native material) - 90% ASTM D 1557 or 95% WSDOT test Method 609 Class D trench backfill - 95% ASTM D 1557 or 95% WSDOT test Method No. 606 Class C trench bac'kfill - 90% ASTM D1557 Soil embankment - 95% ASTM D 1557 Granular embankment - 95% WSDOT test Method 606 or 95% ASTM D1557 For any other materials not addressed in this Section, Chapter 9 of the WSDOT Construction Manual shall be followed. Statistical Evaluations of Materials for Acceptance Delete 1-06.2(2) except Paragraph C. 14 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.1 Laws to be Observed Add: The Contractor shall observe all ordinances, codes, and permit requirements of the City. 1-07.9 Wages Add: The Contractor shall pay all required fees established in WAC 296-127-045 and consider said fees incidental to the project. 1-07.11(3) Delete 1-07.11(4) Delete 1-07.11(5) Delete 1-07.11(6) Delete 1-07.11(7) Delete 1-07.11(9) Delete 1-07.11(10) Delete 1-07.16 Protection and Restoration of Pro]2e 1-07.16(t) Add: In the event that damage occurs and a claim for damages is filed by an individual, -the Contractor will request that its insurance company personally contact the claimee. The Contractor shall provide written evidence of the request to the City. Any settlement for insurance claims shall be strictly an act restricted to the claimee, the Contractor, and his insurance company. 1-07.17 Utilities and Similar Facilities Add: The Contractor shall use the one call (1-800-424-5555) for field locates in accordance with RCW 19.122 prior to excavation. Water system valves shall be operated by City personnel only. 1-07.18 Public Liabili1y and PropeM Insurance Add: The City shall be named as coinsured in the Contractor's policy. The insurance policy and certificate of insurance shall name the City as additional insured and indemnifies and holds harmless all officers and employees of the City for any claims arising from the project. No termination or changes in coverage or language shall be without a 30-day written notice to the City by certified mail. The Contractor shall provide a copy of the policy upon request to the City within 10 days of the request. The minimum property damage insurance shall include $1,000,000 for bodily injury and $1,000,000 for property damage with combined aggregate of $2,000,000 for general liability and $1,000,000 for both bodily and property damage for automobile liability, with a total of $2,000,000. Conditions in this paragraph shall govern. 1-08 PROSECUTION AND PROGRESS 1-08.9 Liquidated Damages Change "working day(s)" to "calendar day(s)". 1-09 MEASUREMENT AND PAYMENT 1-09.1 Measurement of Ouantities Add: Concrete and truck tickets shall be delivered to the Engineer or his representative within four (4) hours of delivery of material to the job site. If the Engineer's office is closed, tickets will be delivered to the City Police Department, with a message for said tickets to be delivered to the Engineer. Truck tickets not delivered within the specified time shall constitute grounds for rejection by the Engineer. In resolving discrepancies or conflicts regarding crushed rock or asphalt tickets, the Engineer shall use 1.90 tons per compacted cubic yards of crushed rock and 2.05 tons per compacted cubic yards for asphaltic concrete. The Contractor, with the Engineer's approval and prior to delivery of materials, establishes a project conversion factor approved by the Engineer using a minimum of ten (10) tons of material. 1-5 1-09. 1 a Add: Incidental Items Any materials, equipment, or work that is required to complete the project as shown on the drawings, in the specifications, applicable building codes, and not specifically listed in the Proposal, shall be considered incidental to the project and bid items, except for adequate safety systems in accordance with RCW 49.17 for trenches exceeding four (4) feet in depth. 1-09.5 Deleted or Terminated Work Add: Materials which are estimates, paragraph 1-02.3, shall not apply to paragraph 1-09.5. 1-09.8 Payment for Material on Hand Add: The Engineer shall decide if any payment for materials on hand will be paid. The contractor shall be responsible for securing material on site and any loss shall be at the contractor's expense. Payments for materials shall not exceed 90% of the actual invoice costs. 1-09.9(1) Retainage Add: In conformance to RCW 60.28.010, retainage in the amount of five (5) percent shall retained from each payment. The retainage will be released after the 45-day appeal period following final acceptance (I- 05.12), receipt of certification of payment for excise tax from Department of Revenue, receipt of "Affidavit of Wages Paid" from Department of Labor and Industries and releases from Department of Labor and Industries regarding RCW 51.12.050 and RCW 51.12.070. 1-09.11(3) Time Limitations and Jurisdictions Substitute: Superior Court of Snohomish County for Superior Court of Thurston County 1-99 APWA SUPPLEMENT Delete the APWA Supplement Section 1-99. 1-6 C\Docuffients and ScuingsTurtisNy Docun=ts\Engsec\SPECS\Modificwions\Cunent\])ivl.Revise April.06.doe Revised April 2006 2.09 STANDARD SPECIFICATIONS CITY OF EDMONDS MODIFICATIONS DIVISION 2 — EARTHWORK STRUCTURE EXCAVATION 2.09.1 Description This section covers the work necessary for trench excavation and backfill for all pipelines, complete. A. B. C. Ha Trench Excavation Excavation is unclassified. Complete all excavation regardless of the type of materials encountered. The contractor shall do an estimate of the kind and extent of the various materials that will be encountered in the excavation. Type of Bedding Bedding consists of pipe base and pipe zone material. Pipe zone material shall be required for all pipe. Pipe base material will be required for pipes except ductile iron pipe. Pipe base material for ductile iron shall be required when, in the opinion of the Engineer, the native trench bottom is not suitable for laying pipe. Types of Backfill For bidding purpose, the class of backfill to be used above the pipe zone is indicated on the plans or class C if not shown. The City reserves the right to modify the use, location, and quantities of the various types of backfill during construction according to the established bid item prices. The Engineer will designate the type of backfill to be used in each location throughout the construction of the project. The general classifications of backfill are as listed below: 1. Class B Class B backfill will be used in unsurfaced areas where compaction and subsequent settlement are not critical. 2. Class C Class C backfill will be used in unsurfaced areas or road shoulders where reseeding, sod replacement, or shoulder replacement will be required. Compaction in these applications is important, as the subsequent settlement must be held to a minimum. 3. Class D Class D backfill will be used in unsurfaced and surfaced areas where compaction is critical to ensure that no settlement occurs. Pavement replacement and shoulder replacement will be made shortly after backfilling. Water for Trench Compactio The contractor shall make all arrangements for a source of water. All City water shall be metered and supervised by the City. The contractor shall be responsible for any deposit fees. 2-1 I 1 ",9*, I I I I Construction Requirements A. Surface Preparation for Excavation Conform to subsection 2.01 Cleariniz, Grubbiniz and Roadside Cleanup B. Trench Excavation and Shoring Open Trench Limited The length of trench excavated in advance of the pipe laying operation shall be kept to a minimum, and in no case shall it exceed three hundred (300) feet, unless specifically authorized by the Engineer. 2. Trench Width Contractor shall conform to state and federal laws. Minimum width of unsheeted trench in which pipe is to be laid shall be eighteen (18) inches greater than the outside diameter of the pipe, or as approved. Sheeting requirements on each side shall be independent of trench widths. The maximum permissible trench width from the bottom of the trench to the crown of the pipe shall be as follows: 15 inch diameter and smaller 40 inches 18 inch diameter and larger 1-1/2 times the inside diameter of the pipe plus 18 inches If the maximum trench width at the crown of the pipe is exceeded by the contractor without the written authorization of the Engineer, the contractor will be required, at his own expense, to provide pipe of higher strength classification or to provide a higher class of bedding, as approved by the Engineer. Maximum permissible trench widths shall be as shown on the plans. If the maximum permissible trench width is exceeded, contractor shall be solely responsible for all costs associated with the additional trench width including, but not limited to, backfill and surface restoration. 3. Trench Safe!y Systems Safety systems shall be provided in conformance to Washington Industrial Safety and Health Act, Chapter 49.17 RCW. 4. Grade Excavate the trench to the lines and grades shown or as established by the Engineer (Section 1-05.4) with proper allowance for pipe thickness and for pipe bedding (base) material as required. If the trench is excavated below the required grade, correct any part of the trench excavated below. the grade with material of the type specified for pipe bedding at no additional cost to the City. Bell (Joint) Holes At the location of each joint, the contractor shall dig bell (joint) holes of ample dimensions in the bottom of the trench and at the sides where necessary to permit the joint to be made properly and to permit easy visual inspection of the joint. I 2-2 6. Disposal of Excess Excavated Material Contractor shall make arrangements for the disposal of all excess material and bear all costs. 7. Shoring, Sheeting, and Bracing of Trenches All sheeting, shoring, and bracing of trenches shall conform to the safety requirements of the federal, state, or local public agency having jurisdiction and as required to protect the pipe. The most stringent of these requirements shall apply. 8. Location of Excavated Materials During trench excavation, contractor shall place the excavated material only within the construction easement, right-of-way, or approved working area in such a manner that it will cause a minimum of inconvenience to the traveling public and provide for merging traffic where necessary. Contractor shall not obstruct both lanes of traffic on any private or public traveled roadways or streets. The contractor shall also take the necessary steps to control erosion of the excavated material. C. Dewatering The contractor shall furnish, install, and operate all necessary machinery, appliances, and equipment to keep excavations free from water during construction, and shall dewater and dispose of the water so as not to cause injury to public or private property or to cause a nuisance or a menace to the public. E. Trench Backfill I General When backfill is placed mechanically,- push the backfill material onto the slope of the previously placed and allow the material to slide down into the trench. Do not push backfill into the trench in such a way as to pern-tit free fall until two (2) feet of cover or more is provided over the top of the pipe. Under no circumstances, allow sharp or heavy pieces of material to drop directly onto the pipe or the tamped material around it. All backfill, regardless of class, shall be placed in successive layers not to exceed eight (8) inches in loose thickness and each layer shall be compacted to the density specified herein. At no time shall backfill material be placed in the trench if the moisture content exceeds two percent (2%) of optimum moisture for the approved backfill material. If the moisture content is less than two percent (2%) of the optimum, additional water may 6e required based on the recommendations of the City's soils testing consultant or approval from the City Engineer. Backfilled trenches shall be reasonably smooth, free from ruts and material neatly windowed over the trench and excess removed. If the trench is over driveways, roadways or paved shoulders, the surface shall be temporarily covered with two (2) inches of cold mix per the standard trench detail. Unpaved surfaces shall have material neatly mounded not more than six (6) inches above the existing ground for the entire width of the trench. Estimate and provide the amount of backfill material required so after non-nal settlement, the finished surface will meet the existing grade. Any excess or deficiency after normal settlement shall be corrected accordingly. Screen all boulders and stones from the backfill material that are two (2) inches in diameter or larger in the upper twelve (12) inches of the backfill. When, in the opinion of the Engineer, selected backfill material is unsatisfactory, the contractor shall furnish imported backfill material as approved by the Engineer. 2-3 F 2. Class B Backfill Backfill the trench above the pipe zone and compact to ninety percent (90%) of maximum density as determined by ASTM D1557 (see 1-06.2). Determine the type of compaction required to prevent subsequent settlement. Class C Backfill Backfill the trench above the pipe zone and compact to ninety percent (90%) of the maximum density as determined by ASTM D 15 57 (see 1-06.2). Detern-line the type of compaction required to prevent subsequent settlement. 4. Class D Backfill Backfill the trench above the pipe zone with approved backfill material to a minimum of ninety-five percent (95%) as. determined by ASTM D1557 (see 1-06.2). If the native material does not comply with the specifications, the contractor shall use imported material as approved by the Engineer. Maintenance of Trench Backfill Any subsequent settlement of the finished surface during the warranty period shall be considered a result of improper or insufficient compaction and/or excessive moisture content and shall be promptly repaired by the contractor at no cost to the City. Maintain the backfilled trench surface until the following applicable operations have been completed and approved by the Engineer: a. Service connections, installed and backfilled. b. Valves, valve boxes, and hydrants installed. C. Pressure testing. d. Cleaning, flushing, and steriUation. e. Cleanup and restoration of all physical features. f. Utilities restored to their original condition or better. 9. All work required between the two valves or manholes accomplished, with the exception of final surfacing. This maintenance shall include, but not limited to, keeping the surface of backfilled trenches reasonably smooth, free from ruts and potholes, and suitable for non-nal traffic flow, where applicable. No additional payment will be made for the maintenance of the trench backfill before completion of the work outlined above, except for cold mix asphalt when directed or requested by the Engineer. - No final pavement replacement shall be undertaken until all items outlined above have been completed and approved by the Engineer. Maintenance of backfilled trenches is considered to be incidental to this item of work, and payment for such maintenance will be considered as included in payment for class of backfill. CoLnpaction of Backfill Mechanical compaction is generally recommended for trenches. Contractor will supply, operate and maintain the proper equipment to compact the classification of material relative to the field conditions. Water settlement may be used to compact sand, pit run, and gravel type 2-4 G. H. 1. K. backfills. If the contractor desires to use water settling, he shall submit in detail to the Engineer for approval, the procedure to be used. The contractor, as directed by the Engineer and at no additional cost, shall excavate test holes to review the effectiveness of compaction. If, in the opinion of the Engineer, the specified compaction and densities are not being achieved in accordance with 1-06.2, the contractor shall recompact the backfill material. If required, water saturated material shall be removed, dried, and placed back in lifts or replaced with imported backfill material. The contractor shall be responsible for all costs for labor, materials, and delays resulting from improper compaction and recompaction. Embankments Structural Embankment Construct embankment to support the pipeline in accordance with the details shown on the plans. Spread excess excavated trench material in maximum one (1) foot lifts for the full width of the embankment cross section and compact to a minimum of ninety- five percent (95%) of maximum density for the full depth of the fill as determined by ASTM D 15 5 7 (see 1-06.2). Compact the embankment to its final cross section before the trench excavation for the pipe is made. Additional Pipe Cove In locations where insufficient pipe cover exists, place selected native material over the pipe as shown or directed to provide a minimum cover of three (3) feet. Slope pipe cover to prevent blockage of surface runoff. No additional payment will be made for furnishing additional pipe cover. Drainage Ditch Restoration Undercrossings of ditches shall be backfilled with imported granular backfill material or as approved to within the top one (1) foot of the ditch bottom. Place approved rock or rip -rap material in the top foot. Correct any ditch damage as a result of contractor's operations at no cost to the City. Payment for ditch restoration will be considered as incidental to the project. Cold Mix Asphalt Cold mix asphalt used for temporary repair of utility trenches or other small areas shall be placed by hand, then raked to a smooth and uniformly dense layer before compacting. On large areas, which have been determined by the Engineer to be temporarily repaired with cold mix asphalt, the rnix shall be spread with mechanical spreading equipment, such as a "Layton Paver," to a smooth and uniformly dense layer before compacting. In areas inaccessible to the mechanical spreading equipment, cold mix shall be placed by hand. Resurfacing Resurfacing, including asphalt patching, graveling, and landscaping shall be performed after the maintenance of trench backfill. Settlement Any settlement observed in the backfill, embankment, or in structures, including pipelines and manholes built over compacted material or embankment within the warranty period will be considered to be caused by improper compaction methods and/or pumping due to excessive moisture and shall be corrected and repaired at no cost to the City. Pipelines and structures which have settled shall be removed and reconstructed to the original condition at time of acceptance at no cost to the City. 2-5 1*09*5 Paymen, A. Unit Price Payment shall be made at the unit prices as stated in the contractor's bid proposal for the backfill classification using imported materials. Native materials used for base, bedding and backfill shall be considered incidental to the unit price for pipe. Payment shall be consideredfull compensation, including all labor, equipment, and materials for excavation, dewatering, backfill, compaction, hauling, maintenance, and testing, complete. Trench safety systems shall be at the unit bid price in the bid proposal. Measurement shall be the length of the centerline of the pipe, fittings, and valves in place. Extra excavation and backfill at ends of pipes, fittings, and valves shall be considered incidental to the bid items. Trench excavation and payment for lump sum items shall not be paid for under this item. 2.12 CONSTRUCTION GEOTEXTILE 2.12.5 Payment Payment for all labor, materials, tools and equipment required for the installation of the construction geotextile in accordance with the Construction Documents shall be included by the Contractor in the unit contract price for "Subsurface Drain" bid itern. 2-13 IMPERMEABLE MEMBRANE 2-13.1 Description This section described furnishing and installing an impermeable membrane as part of the subsurface drain. 2-13.1(1) Definitions Installer: The party responsible for field handling, storing, deploying, and other site aspects of impermeable membrane installations. Also responsible for transportation of these materials to the site. Also called Contractor. PVC Geomembrane Manufacturer: The party responsible for the production of the PVC geomembrane rolls. 2-13.1(2) Field Quality Control The Contractor shall inspect each impermeable membrane in its entirety. Any area showing a defect shall be marked and repaired in accordance with these Specifications. During the construction phase, each impermeable membrane shall be continuously inspected for uniformity, damage, and imperfections (for example, holes, cracks, thin spots, or foreign materials). Immediately after installation, each impermeable membrane shall be inspected to confirm the absence of tears, punctures, or blisters. Any imperfections shall be immediately repaired and re -inspected. 2-13.1(3) Transportation, Handlina, Storage, and Protection Use all means necessary to protect the material and Work of this Section before, during, and after installation. 2-6 2-13.2 Impermeable membranes shall be marked and tagged with the following infon-nation: A. Manufacturer's name. B. Product identification. Promptly inspect shipments to assure that materials comply with requirements, quantities are correct, and materials are undamaged. Arrange storage of material to pern-ift access for inspection. Periodically inspect to assure materials are undamaged and are maintained in acceptable conditions. Store panels in their original unopened package in a dry area protected from direct heat or sunlight. Store impermeable membranes to protect from puncture, dirt, grease, water, moisture, mud, mechanical abrasions, excessive heat, or other damage. Store impermeable membrane on prepared flat surface (not on wooden pallets). Use appropriate handling equipment for deployment. Impermeable membrane damaged during handling shall be repaired to the satisfaction of the Engineer. Impermeable membrane irreparably damaged, as determined by Engineer, shall be immediately removed from the site and replaced. Repair, removal, and replacement shall be solely at Contractor's expense. Materials The material supplied under these Specifications shall be first quality industrial grade products designed and manufactured specifically for the purposes of this work, and which have been satisfactorily demonstrated by prior use to be suitable and durable for use intended. The impermeable membrane material shall be PVC. The impermeable membrane shall conform to the properties detailed below: Test Test Designation Requirement 30 mil Thickness ASTM D 1593 28.5 mil Density ASTM D 792 1.20 Tensile Strength ASTM D 882 70 lbs/in. width Elongation ASTM D 882 300% Tear Resistance ASTM D 1004, Die C 8 lbs All specification values are minimum roll values. The impermeable membranes shall be a homogeneous material uniform in color, thickness and surface texture, free of undispersed raw materials, streaks, foreign material, gels, and any signs of delanunation, blisters, cracks, tears or pinholes. Impermeable membrane materials shall be chemically and temperature stable under the conditions in which they will be subjected, and shall contain no additives or filler which can leach out and cause deterioration over time. The sheeting shall be suitably formulated from a homopolymer vinyl chloride resin of Type GP in accordance with ASTM D 1755 to impart durability (ASTM D 3083). Use of water-soluble compounding ingredients is prohibited. Plasticizers that are resistant to migration, mildew, and bacterial degradation shall be used. The sheeting shall be pigmented to produce a uniform color and UV stabilized with carbon black. The sheeting shall be capable of being repaired with the use of solvent cement. 2-13.2(l). Local Suppliers To assist the contractor, the names of the following local suppliers are provided: A. Northwest Lining and Geotextile Products, Inc., Kent, WA (253) 872-0244 2-7 B. Layfield Plastics. Bellevue, WA (800) 796-6868 Other local suppliers may also be available. 2-13.3 Construction Requirements 2-13.3(l) Inspection The Engineer will inspect the subgrade and give approval that it is suitable. 2-13.3(2) Installation 1. The impermeable membrane panels shall be installed to overlap by I foot as necessary. 2. During installation of the impermeable membrane, the following requirements shall be met: a. Install impermeable membrane using method that will not damage, stretch, or crimp impermeable membrane and protect underlying surface from damage. b. Personnel working on impermeable membranes shall not engage in activities that could damage the impermeable membrane. c. Unroll impermeable membrane using method that shall not damage, stretch, or crimp impermeable membrane and protect underlying surface from damage. 3. Membrane shall be laid underneath and on the north side of the subsurface drain trench, as shown on the contract drawings. 2-13.3(3) Visual Inspection During installation, visually examine all areas of overlap of the impermeable membrane for defects, holes, blister, undispersed raw materials, and any sign of contamination by foreign matter. Clean surface of the impermeable membrane prior to examination. Mark areas suspected of deficiencies. Repair each suspect location. 2-13.3(4) Repair Repair any portion of the impermeable membrane exhibiting a flaw or failing a visual inspection test in accordance with manufacturer's instructions. Patches shall be made from the same material as the impermeable membrane and shall extend a minimum of 4 inches beyond the defect. Repair, removal, and replacement shall be at Contractor's expense. 2-13.4 Measurement Impermeable membrane shall be measured by the square foot. 2-13.5 Payment Payment for all labor, materials, tools, and equipment required for the installation of the impermeable membrane in accordance with the Contract Documents shall be included by the Contractor in the unit contract price for "Subsurface Drain" bid item. 2-8 2-14 CONCRETE SEGMENTAL BLOCK WALL 2-14.1 Description This section describes a small retaining wall enclosure constructed of concrete segmental blocks to be installed to replace the existing retaining wall on -site. 2-14.1(1) Subn-dttals A. Submit the following: 1. Product Data: Material description and installation instructions for each manufactured product specified 2. Samples a. Furnish one unit in the color and face pattern specified. 3. Test Reports: Independent laboratory reports stating moisture absorption and compressive strength properties of the concrete retaining wall units meet the Project Specifications when tested in accordance with ASTM C140, Sections 6, 8 and 9. 2-14.1(2) DeliverV Storage and Handling 2-14.2 A. Deliver, store, and handle materials in accordance with manufacturer's recommendations, in such a manner as to prevent damage. Check the materials upon delivery to assure that proper material has been received. Store above ground on wood pallets or blocking. Remove damaged or otherwise unsuitable material, when so determined, from the site. I . Exposed faces of concrete wall units shall be free of chips, cracks, stains, and other imperfections detracting from their appearance, when viewed from a distance of 10 feet. 2. Prevent mud, wet cement, adhesives and similar materials which may harm appearance of units, from coming in contact with system components. Materials A. Concrete Blocks I Meet requirements of ASTM C 13 72, except the maximum water absorption shall be limited to 7 percent, and unit height dimensions shall not vary more than Plus or minus 1/ 16 inch from that specified in the ASTM reference, not including textured face. 2. Unit Face Area: Not less than 0.33 square feet. 3. Color: Selected by the Engineer from manufacturer's full range of standard colors. 4. Face Pattern Geometry: Straight or tri-plane 5. Texture: Split Rock Face. 6. Include an integral concrete shear connection flange/locator. B. Construction Adhesive: Exterior grade adhesive as recommended by the retaining wall unit manufacturer. 2-9 2-14.3 Construction Requirements 2-14.3(l) Examination A. Examine the areas and conditions under which the retaining wall system is to be erected, and notify the Engineer in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected. B. Verify the location of existing structure, features and utilities prior to excavation. 2-14.3(2) Excavation A. Excavate to the lines and grades shown on the Drawings. Over -excavation not approved by the Engineer will not be paid for by the Owner. Replacement of these soils with compacted fill and/or wall system components will be required at the Contractor's expense. Use care in excavating to prevent disturbance of the base beyond the lines shown. 2-14.3(3) Foundation Preparation A. Excavate foundation soil as required for footing or base dimension shown on the Drawings, or as directed by the Engineer. B. The Engineer will determine if the foundation soils will require special treatment or correction to control total and differential settlement. C. Fill over -excavated areas with suitable compacted backfill, as recommended by the Engineer. 2-14.3(4) Base Course Preparation A. Place base materials to the depths and widths shown on the Drawings. 1. Extend the leveling pad laterally at least 6 inches in front and behind the lowermost concrete retaining wall blocks. 2. Provide aggregate base compacted to 6 inches thick (minimum). 3. The Contractor may at their option, provide a concrete leveling pad, in lieu of the aggregate base. B. Compact aggregate base material to provide a level, hard surface on which to place the first course of blocks. C. Prepare base materials to ensure complete contact with retaining wall blocks. Gaps are not allowed. 2-14.3(5) Erection A. General: Erect units in accordance with manufacturer's instructions and recommendations, and as specified herein. - B. Place first course of concrete wall units on the prepared base material. Check units for level and aligninent. Maintain the same elevation at the top of each unit within each section of the base course. C. Ensure that foundation units are in full contact with the compacted base. D. Place concrete wall blocks side -by -side for ftill length of wall alignment. Alignment may be done by using a string line measured from the back of the block. Gaps are not allowed between the foundation concrete wall blocks. E. Check each course for level and alignment. Adjust units as necessary to maintain level and alignment prior to proceeding with each additional course. 2-10 F. Install each succeeding course. Backfill as each course is completed. Pull the units forward until the locating surface of the unit contacts the locating surface of the units in the preceding course. Interlock wall segments that meet at comers by overlapping successive courses. Attach concrete retaining wall units at exterior comers with adhesive specified. 2-14.3(6) Backfill Placement A. Place fill and compact with only lightweight hand -operated compaction equipment 2-14.3(7) Cap Unit Installation A. Apply adhesive to the top surface of the unit below and place the cap unit into desired position. B Cut cap units as necessary to obtain the proper fit. 2-14.3(8) Tolerances A. Site Construction Tolerances I Vertical Alignment: Plus or minus 1- 1/2 inches over any I 0-foot distance, with a maximum differential of 3 inches over the length of the wall. 2. Horizontal Location Control From Grading Plan a. Straight Lines: Plus or minus 1- 1/2 inches over any I 0-foot distance. b. Comer and Radius Locations: Plus or minus 12 inches. 3. Immediate Post Construction Wall Batter: Within 2 degrees of the design batter of the concrete retaining wall units. 4. Bulging: Plus or minus 1- 1/4 inches over any I 0-foot distance. 2-14.3(9) Adousting and Cleaning A. Replace damaged units with new units as the work progresses. B. Remove debris caused by wall construction and leave adjacent paved areas broom clean. 2-14.4 Measurement Measurement of segmental block wall shall be on an installed square foot basis computed on the total face area of wall installed. Wall face area includes the bottom of the base course of blocks to the top of the wall, and the entire length of the wall. 2-14.5 Payment Payment for the wall will be made on a square foot basis at the agreed upon Contract Unit Price. 1. Payment should be considered ftill compensation for labor, materials, equipment and testing required to install the wall in accordance with these specifications and the Drawings. 2. Quantities may vary from that shown on the Drawings depending on existing topography. Change to the total quantity of wall face area will be paid or withheld at the agreed upon Contract Unit Price. STANDARD SPECIFICATIONS CITY OF EDMONDS MODIFICATIONS DIVISIONS 3 THROUGH 8 The following technical specifications shall be modified, clarified, or superseded as described below. 5-04 HOT MIX ASPHALT 5-04.3(4) Rollers Pneumatic tire rollers shall not be used unless specified in the Special Provisions. 5-04.3(17) Paving Under Traffic Open trenches within the traveled way or auxiliary lane shall have a steel -plate cover placed over therri. A wedge of suitable materials, if required, shall be placed for a smooth transition between the pavement and the steel plate at the discretion of the Engineer. Warning signs shall be used to alert motorists of the presence of the steel plates. 5-04.5 Payment Payment for tack coat shall be incidental to the bid items. Cold patch or temporary patch, as directed by the Engineer, shall be paid for as a two (2) inch thickness per unit measure as defined in the proposal. 6-02 CONCRETESTRUCTURES 6-02.3(l) Classification of Structural Concrete Class 3000 concrete, minimum 5 1/2 sack (94 pound sacks) mix, shall be used for all concrete work, including sidewalks, curb and gutter, curbs, retaining walls, and small structures. 6-02.3(6)A Weather and Temperature Limitations Protection of Concrete A clear, not white, curing compound shall be brushed or sprayed on all exposed concrete immediately after the finishing work. Other protective measures for weather constraints are still required, including protection from excessive hot and cold temperatures (including wind chill). 6-02.3(12) DumM Joints Dummy joints shall consist of a tooled 1/4- inch joint into the concrete pour and shall be placed at 10-foot intervals. All work shall be perpendicular and straight. 6-02.3(13) Expansion/Contraction Joints The following requirements apply to all curb, curb and gutter, and sidewalk work. Full depth expansion joints, consisting of 1/2-inch thick premolded material (AASHO M213), shall be placed perpendicularly when abutting to existing improvements at each side of driveway cuts and at a maximum spacing of ten feet. Curb and gutter installations will require an additional 2-inch cut or the installation of a 1-inch by 4-inch wedge into the heel of the pour. All work shall be perpendicular and straight. 6-02.3(14) Finish Concrete Surfaces The finished improvements shall be true to grade, straight with smooth transitions or curves. Grade checked with a ten -foot straight edge placed anywhere on the slab in any direction and shall not deviate more than 1/8 inch, and alignment shall not vary more than 1/4 inch. 113al The finish shall be a light broom finish as approved by the Engineer in 1-05.6 Inspections. The City will not accept finishes that are non -uniform, overworked, discolored, spalling, damaged by weather, or where a cement layer has formed. 7-04 STORM SEWERS 7-04.2 Materials See approved material listings MM- I through MM-4 as contained in City of Edmonds Material Modifications, Divisions 7, 8 and 9. 7-04.3(l) Cleaninp, and Testing All pipes shall be tested for exfiltration. 7-04.3(3) Add: Backfilling Storm Sewer Trenches Storm sewer pipes shall be bedded and backfilled as specified in Section 2.09. 7-04.5 Pa3mien Same as water mains for pipelines. (See Section 7-09.5) 7-05 MANHOLES, INLETS, CATCH BASINS AND DRYWELLS 7-05.3(5) Add: Connection to Existing Line, Catch Basin, Curb Inlet or Manhole (New Section) Where shown on the plans, new stormwater pipes shall be connected to existing lines, catch basins, curb inlets and/or manholes. The Contractor shall not tap directly into stormwater main pipes but shall install a structure to make said connection. The Contractor shall be required to core drill into the structure, shape the new pipe to fit, and regrout the opening in a workmanlike manner. Where directed by the Engineer or where shown on the plans, additional structure channeling may be required. 7-05.4 Measurement Replace paragraph four with: Structure excavation Class B, including haul, shall be included as part of the applicable unit or lump sum bid item. 7-05.5 Paymen Payment shall include adjustments of frames and grates to final grade. See Special Provisions. 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 7-08.3(1)C Bedding the Pipe Pipe bedding for PVC pipe shall be placed to a depth of 6" below the bottom of the pipe and extending up 6" above the crown on all pipes. The hand -placed bedding around the pipe and to a point 6 inches above the crown shall be rammed and tamped by use of shovels or other approved hand held tools so as to provide firm and uniform support over the full length of all pipes. All other requirements for pipe bedding shall be per Section 9.03. Pipe bedding shall be considered incidental to the unit price for all pipe and no further compensation shall be made. 7-09 WATER MAINS 7-09.2 Materials See approved material listings MM- I through MM-4 as contained in City of Edmonds Material Modifications, Division 7, 8 and 9. M-2 7-09.3(11) CoLnpaction of Backfill See 1-06.2(l) Samples and Tests. 7-09.3(23) Hydrostatic W ter Pressure Test Tests shall be for all pipe sizes and the test pressure shall be 225 psig two hours. A pressure drop of more than five psig during the test period shall constitute rejection. 7-09.3(24)D Dry Calcium Hypochlorite Calcium Hypochlorite shall be added and placed upstream end of the first section of pipe and each branch main, and at 500-foot intervals. The amount of Calcium Hypochlorite to be added to the pipe shall be as outlined in the table below. Pipe Diameter (Inches) Quantily (Oz.) 4 1.7 6 3.8 8 6.7 10 10.5 12 15.1 7-09.5 Paymen Payment also shall include thrust blocks, couplings, restrained joints, testing, flushing and disinfection. Special connections or connection to existing pipelines shall be considered incidental unless a separate bid item is in the proposal. Separate bid items shall include all materials, equipment, and labor to make the connections. See Special Provisions. 7-12 VALVES FOR WATER MAINS See approved materials list MM- I through MM-4 7-14 HYDRANTS See approved materials list MM- I through MM-4. 7-15 SERVICE CONNECTIONS See approved materials list MM- I through MM-4 7-17 SANITARY SEWERS 7-17.2 Materials See approved materials list MM- I through MM-4. 7-17.3(l) Protection of Existiniz Sewerage Facilities Add: When extending an existing sewer, the downstream system shall be protected from construction debris by placing a screen or trap in the first existing manhole downstream of the connection. It shall be the Contractor's responsibility to maintain this screen or trap until the new system is placed in service and then to remove it. Any construction debris which enters the existing downstream system shall be removed by the Contractor at his expense, and to the satisfaction of the Engineer. When the first manhole is set, the outlet shall be plugged until acceptance by the Engineer. M-3 7-17.3(2)A General See Section 1-05.4. 7-17.3(2)1 Add: Sewer Line Connections Add: Unless otherwise approved by the Engineer, all connections of lateral sewers to new ductile iron pipe or existing mains shall be made through a cast iron saddle secured to the sewer main with stainless steel bands. The main shall be core drilled. Connections to concrete manholes shall be core drilled, and shall have an "0" ring rubber gasket meeting ASTM C-478 in a manhole coupling equal to the Johns -Manville asbestos - cement collar, or use a conical type flexible seal equal to Kore-N-Seal. 7-17.4 Measurement Add: All costs associated with structure excavation Class B, including haul, shall be included in other contract pay items. Add: Measurement of imported granular trench backfill material for Class D, including haul, material shall be by the cubic yard as described in Section 2-09.4. 7-17.5 PayLnen Add the following: See the Special Provisions for a description of pay items utilized for the project. It 135 IKI! C:\Docun=ts and Se"ings\Curtis\My Docun=ts\Engscc\SPECS\Modifimtiom\CummtU:)iv3-8. Revise April 06.doc Revised April, 2006 9.03 9.03.16 L11 I I I 11 I I I I STANDARD SPECIFICATIONS CITY OF EDMONDS MODIFICATIONS DIVISIONS 9 - MATERIALS AGGREGATES Add: Bedding Materials A. Rigid Pipe Bedding material for rigid pipe shall be free from wood waste, organic material and other extraneous or objectionable materials. Bedding material shall conform to the following gradations when tested in accordance with ASTM D422. Maximum particle size for ductile iron pipe shall be 1- 1/2 inches. 1. Base Material Select: Selected excavated material for pipe base shall not contain particles larger than 5/8 inches. Import: Imported base material shall be clean granular sand, or sand and gravel mix conforming to the following gradation: Passing 3/4 inch square opening 100% Passing 3/8 inch square opening 95%-100% Passing U.S. #8 sieve 0%-10% Passing U.S. #200 sieve 0%-3% Sand equivalent 35 min. 2. Pil2e Zone Pipe zone material shall be crushed, processed or naturally occurring granular material or pea gravel, conforming to the following gradation: Passing 3/4 inch square opening 100% Passing 3/8 inch square opening 95%-100% Passing U.S. #8 sieve 0%-10% Passing U.S. #200 sieve 0%- 3% Sand equivalent 35 min. B. Thermoplastic Pipe Bedding material for thermoplastic pipe shall be free from wood waste, organic material and other extraneous or objectionable materials. Bedding material shall conform to the following gradations when tested in.accordance with ASTM D422. Pipe zone material shall be crushed, processed or naturally occurring granular material or pea gravel conforming to the following gradation: Passing 3/4 inch square opening 100% Passing 3/8 inch square opening 95%-100% Passing U.S. #8 sieve 0%- 10% Passing U.S.. #200 sieve 0%- 3% Sand equivalent 35 min. I 9-1 I I 9*01,19 Bank Run Gravel for Trench Backfill All backfill material shall be free from wood waste, organic material and other extraneous objectionable materials. Material shall be uniformly graded from course to fine and conform to the following gradation when tested in accordance with ASTM D422: I . Select Maximum particle size for this material shall be T/2 inches. 2. I!Dport Particle size for this material shall be 11/4" munus CSBC. 11 I I I I I -1 1 9-2 CADocuTnents and Settings\CurtisWly Documents\Engsec\SPECS\Modifications\CurrentNodDiv9.Revise April 06.doc Revised April 2006 CITY OF EDMONDS MATERIAL MODIFICATIONS "11%)IIrQWI-%xTQ �y a A Nr" a I I The following material specifications shall clarify, supplement and supersede where applicable the standard specifications. MATERIALS A. City of Edmonds approved materials: * approved only when shown in the plan, proposal, or special provisions. 1. WATER SYSTEMS MATERIAL DESCRIPTION -MANUFAt-TlJkER:' Pipe Class 52 ductile iron (AWWA C151) (or class as noted on plans) Fittings Class 250 cement mortar lined cast iron or ductile iron (AWWA C 153) Nuts, bolts Ductile iron or alloy steel A 303, grade B Mechanical couplings Cast iron type for cast iron Rockwell or ductile iron pipe, steel type for steel pipe Dresser Romac Restrained joints Flanged US pipe, Clow locking type pipe US pipe field lock gaskets US pipe uni-flange Uni-Flange kwik-flange Standard Int retainer gland Clow F 1058 couplings with anchor pins Romac, Rockwell Dresse Joint lubricant U. S. Pharmacopoeia No. P39 *Gate valves (10" and smaller, Clow Clow Corporation AWWA C500) Manhole No. 67 Dresser Kennedy Kennedy Valve Mueller Mueller Co. Gate valves, resilient wedge (10" & Clow Clow Corporation smaller, AWWA C 509) Metroseal 250 U. S. Pipe Series 500 AFC American Flow Control Mueller Mueller Co. Butterfly valves (10" & greater, Groundhog Pratt AWWA C 504) Adap-Torq Kennedy Lineseallll Mueller Co. Tapping valve Cl with MJ joints and tapping valve Mueller, Clow Valve boxes Seattle Style 940 Fire hydrants (all bronze fitted, I- Centurion Mueller Co. 1/4" operating nut, AWWA C 502, Guardian, K-8 I -A Kennedy Valve international yellow paint), 4" Storz Reliant 929 Dresser Adapter (with two 2-1/2" hose Medallion Clow nozzles and one 4-1/2" NST pumper B-62-B American Darling nozzle) Pacer (WB-67-250) Waterous Combination air relief/vaccurn relief Series 140c APCO valve (ARV) Model 202c Val-Matic Model Ul-20 Crispin MM-1 IWater Services and Connections MATERIAL DESCRIPTION MANUFACTtRER: Copper pipe (std service) Soft, type K, ASTM B 88 Polyethylene pipe (I - 1/2" & larger Driscopipe 5 100, high molecular, high density tubing Phillips services) 160 psi min rating IPOD Service clamps (I - 1/2" & larger, I P Model 313 Rockwell thread) Model 202S Romac Model FS202 Ford Model H- 16113 Mueller Co. Ball Corp. stops direct tap with F600 Ford copper service (cc threads) H-15000, H-15008 Mueller Co. 4701-Q A.Y. McDonald *Corp. stops direct tap with H- 15005 Mueller Co. polyethylene service (cc threads) 47013-T A.Y. McDonald Corp. stops with saddle clamps FB 500 Ford (11/2" & larger) H-9968 Mueller Co. 4701-Q A.Y. McDonald Curb stops B I I series Ford Orisel H, H-10283 Mueller Co. 6101 A.Y. McDonald Fittings - copper to copper H-15400, H-15403 Mueller C22 series Ford 4758-Q A.Y. McDonald Polyethylene connections (11/2 & Compression with stainless steel insert Mueller Co. larger) Pack joint with stainless steel insert Ford 4758-3T A.Y. McDonald Meter boxes: Mid -States 0 3 /4" - I" MS I I x I 8x 12 with MS I I x 18 ductile lid & 9"x 61/2" 0 1 V2" — 2" reader MS 17x3Oxl2 with NIS 1700 ductile lid w/9"x 61/2" reader Tracer wire for I" & greater 14 gauge, PVC coated copper wire polyethylene services 1 2. I 11 SEWER SYSTEM sewer pipe) MATERIAL-:,'� DESCIUPTION'. MANUFAiCTLUiklk:­-'.,,-,', Pipe Concrete class 2 (non -reinforced) ASTM C14 or AASHTO M 86 *Concrete (reinforced) ASTM C76 or AASHTO M 170 PVC, SDR 35, ASTM D3034 Fittings and sewer service Same material as pipe PVC sand collars Manholes Precast ASTM C478, 48" min. at bottom. top concentric to 24" opening Steps 3/4" galvanized deformed bar Manhole steps Polypropylene, ASTM D-4101 material over ASTM A- Lane, MA Industries 615, grade 60 steel reinforcing bar, step to comply with ASTM C-478 Frames and covers ASTM A48, class 40, cast iron, East Jordan Ironworks bituminous coated, "sewer" embossed in top Transition couplings Longitudinally bolted coupling with gasketed joi7nT��Romac, Dresser, Rockwell MM-2 3. STORM DRAIN SYSTEM MATERIAL DESCRIPTION MANUFACTURER Pipe *Concrete, reinforced, ASTM C76 or AASHTO M 170 Concrete (non -reinforced) ASTM C14 or AASHTO M86, class 2 *PVC, SDR 35, ASTM D3034 Aluminum CMP, AASHTO M 196, 16 ga. or as shown on plans, gasketed and coupling banded *Aluminum smooth wall pipe, 16 ga. or as shown on Cascade Culvert, Kaiser Aluminum plans, recorrugated ends with annular bands and gaskets *PVC, SDR 35, ASTM D3034 Ductile iron, class 50 Pen-na-loc series 46 by J.M. Manufacturing Co. HDPE; smooth interior pipe, watertight ADS AASHTO M252, M294 Type S Hancor ASTM D 2321 ASTM D 1248 Type III Category 4 Grade P33 Class C ASTM D 3350 (2' Minimum cover under pavement areas) Fitting Same as pipe material PVC sand collars Manholes Precast ASTM C478, 48" min. at bottorr� flat slab top, 8" min. thickness, 24" opening, steps 3/4" galvanized deformed bar Manhole steps Polypropylene, ASTM D-4 101 material over ASTM A- Lane, MA Industries 615, grade 60 steel reinforcing bar, step to comply with ASTM C-478 Frames and covers ASTM A48, class 40, cast iron, East Jordan Ironworks bituminous coated, "drain" embossed in top Transition couplings Longitudinally bolted coupling with gasketed joints Romac, Dresser, Rockwell SUBSTITUTIONS B. .-MATERIAL DESCRIPTION MANUFACTURER Provide submittals for substitute materials to the Engineer for approval in accordance with the Standard Specifications MM-3 CADocuments and SatingsTunisNy Docunients\Engsec\SPECS\Modifications\Current\Mtr[Mod.7-9.Revise April 06.doc Rcvised April, 2006 PART V ON -SITE DETENTION DETAIL DRAWING (5000 SF OR LESS) ADDRESS: CALC. BY: PHONE: DATE: IMPERVIOUS SUFACE AREA PIPE DIA DIA. PE LE NGTH FORIFICE . -ruuj-'IvL� Vj%,4jjVZ)' ��JIALL NOT RIM 6LEV. DETENTION PIPE LENGTH FINISHED GRADE /0 g 4, 4— TIGHTLIN M*4-9- �O� NV. ELEV. UPPER CATCH BASIN M CONTROL CB BE CONNECTED TO OCKING LID (TYP.) IM ELEV. _ 6" Min, clearance Measured from top of Conc. box or riser. DETENTION SYSTEM RIM ELEV, k l" /' � CL� 0 ve. lev flee - TO CITY CONVEYANCE NV. INV. ELEV, ELEV. '�'—oUTLET "-�ONTROL 9.1 T TIN. RIFICE 2" DEEP CONTROL CATCH BASIN UARRY SPALLS OR EQUAL) /***'� FROM CONTROL CS IN. 6" COVER L///SHALIL BE PERPENDICULAR CONTROLCB TO SPREADER TRENCH TRENCH SHALL BE LINED PERF. PIPE SHALL BE WITH MIRAF1 & ON TOP LEVEL & CAPPED AT ENDS RIPRAP OUTLET 7/8" WASHED DRAIN ROCK SPREADER TRENCH NOTES 1. CALL ENGINEERING DIVISION (771-0220 EXT. 1326) 24 HOURS IN ADVANCE FOR A TIGHTLINE AND DETENTION SYSTEM INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS, 2. Responsibility for operation and maintenance of drainage systems on private property is the responsibility of the property owner. Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times, CITY STORM CONVEYANCE SYSTEM SPREADER TRENCH SHALL BE AMIN. OF 10'LONG AND PERPENDICULAR TO CONTROL CB. APPROVEL o1r, �- DATE Table I — Detention Pipe Sizes Impervious Surface Required Pipe Diameter Area So. Ft- Vol Cu Ft 1511, 18" 24" 30" 2000 50 40 28 16 10 2500 62 50 35 20 13 3000 75 60 42 24 15 Required pipe 3500 87 70 49 28 18 length in feet 4000 100 80 56 32 21 4500 112 90 63 36 23 5000 125 100 70 40 25 *NOTE: Use the next highest surface area to. determine detention size if calculated impervious surface area is greater than 1/2 the value between numbers. (i.e., 2280 use 2500) Table 2 Outlet Orifice Sizes Impervious Surface Area Sq. Ft- Outlet Orifice Diameter (Inches) 2000-2999 5/8 3000-3999 3/4 4000-5000 7/8 Table 3 -- Rectangular Catch Basin Requirements Detention Max. Size Catch Basin pipe diameter knockout Type < 18" 20" Type 1, CB 15 18" to 24" 26" Type IL, CB 16 24" to 36" 36" Type 11, CB 19 19 (48" Basin) 36" to 42" 42" Type 11, CB 19 19 (54" Basin) -Source: Assoc. Sand & Gravel Co. Standards ALLLOWABLE STORM DRAINAGE DETENTION OR CONVEYANCE MATERIALS: Reinforced Concrete (right-of-way) Non -reinforced Concrete (non -right-of-way) AluminizedSteel Aluminum 16 GA or better CMP Asphalt Coated N-12 ADS HDPE (Min. 2' cover required under paved areas) water tight PVC-SDR 35, ASTMD-3034 or better Ribbed PVC pipe' ASTM D-2444 Ducticle iron pipe Class 50 Tightlines system: - N-12 ADS (Smooth Wall) - PVC-SDR 35, ASTMD-3034, or better - Hancor F-810 S:NENGR\HANDOUTSkDrainage tables E21 I Civic Center Skateboard Park Stormwater Management Report 1. Predeveloped condition assumptions: 6,465 sq ft site;= 0. 15 Acres; Land use condition; Meadow, Soil Type: Alderwood, Hydrologic Type C Runoff Curve Number--- 85 Time of Concentration: 130' of Sheet flow at 2%= 0.42 hrs (see attached spreadsheet) = 25.2 minutes. 2. Developed Condition assumptions: Impervious area=. 6,465 sq ft, = 0. 15 Acres Runoff Curve Number--- 98 Time of Concentration = 10 rMinutes (minimum, conservative assumption) P eA U 4 A fr'911n S U pot " -2 Yj- loy /00 Yr pre �'e Ve /0 61-ewevel're.l --L- 01 0 0 V -:- 0' 0 Z- C-(�- pre'C'6.-IZ -� 0, 0 (-/ C rs 2- r ro J Oir 1'red 0 0 401-v () � C(� 07 c4s '/0 cc-, ee 44- J 73 cr :z 10-7 11rieJ 4 if v 0 e rt -f� e -e- (4,9 Hoe, 0 0 t-1 r-? '-e ec - (j, . z � r j / otir- re 0 z-( -s 100yr r e- 0 '( C�r ( e- '-, C--) I C -F-� ) Worksheet 3: Time of concentration (Tc) or travel time (Tt) Project: Skateboard Park Location: Developed Condition TC Sheet flow (Applicable to Tc only) Segment ID 1 . Surface description (table 3-1) .. 2. Manning's roughness coeff., n (table 3-1) 3. Flow length, L 4. Two year 24-hr rainfall 5. Land slope, s 6. Compute Tt By: Date: Checked: Date: File: T2 0.24 ft. 130 1.5 ft./ft. 0.02 hr. 0.428513 + M = 0.428513 Results; Elevation Flow Rate Storage (Cf) .00 .00 .00 .00 .20 .00 33.67 .00 .40 .00 67.35 .00 .60 .01 101.02 .00 .80 .01 134.69 .00 1.00 .01 168.36 .00 1.20 .02 202.04 .00 1.40 .02 235.71 .00 1.50 .02 252.55 .00 1.60 .03 269.38 .00 1.80 .03 303.05 .00 2.00 .04 336.73 .00 2.10 ------ 1-5-3-!7-6. 0 0 2.20 .92 370.40 .00 2.30 1.65 387.24 .00 2.40 2.44 404.07 .00 2.50 2.72 420.91 .00 2.60 2.98 437.74 .00 .00 .00 .00 .00 PART VI CONSTRUCTION DRAWING I jrj NNI _,jig J" i0v r r..::i . "I . --->) -�-. VJ Nv 1%, r% 'RUCTION SPECIFIC:&`T�IONS- GENERAI-i All prospective bidders must visit the project site with the Project Manager prior to submitting a bid. A 12' x 12' concrete sample Illustrating color and texture must be submitted and approved by the City prior to placement of concrete. TEMPORARY CONSTRUCTION FENCE, The contractor will be requilred to Install approximately 750 If of 6' Ngh temporary construction fence as directed by the project manager. SITE PREPARATION, Remove approximately 745 cubic yards of material (approximately 2.5' deep) De-wQter site prior to placing base rock. DRAINAGE ROCK BASE, Place, level, compact and configure approximately 500 cubic yards of 5/8' CHIPS as required to accept stab and thickened edge, Utilize Fitter Fabric as depicted In the detail drawing. CONCRETE SLAB, Construct a concrete stab 6' nominal thickness using 3,500 PSI @ 28 day concrete, Slope stab at 2% to the north. Place #4 i-ebar at 2' O.C.(both directions) typ. and as shown In the detail drawing. Concrete to contain fiber mesh to address cracking. Install Appropriate Steel Sleeves (to accept fence posts) In the thickened concrete edge at centers specified. Imbed appropriate 'Conbiform' brand metal key ways #CT512KK In concrete stab at 16.4' oc longitudinally and 14.19' oc transversatly to prevent cracking. Finish Concrete Stab to a smooth finish until all pours are closed. All concrete shatt have Cadman 'Antique Mix' or approved equivalent color Impregnated Into ati. the concrete products. DRAIN SYSTEM (SKATE BOARD COURT AND CONNECTING SLAB SURFACE) Install a 'Dura Slope' Part No. DS-232 continuous track drain system Inc. Ductile Iron Frame Inc. Ductile Iron metal grate. Slope track drain system as shown. Tie Into an approved detention system. Discharge detention system Into existing catch basin. DRAIN SYSTEM (UNDERGROUND DETENTION) (6,465 sq ft total Impervious surface) Construct detention system to comply with the conditions outlined In the detail drawing. Tie detention system outfalt Into existing catch basin approximately 251f north of the structure DRAIN SYSTEM (PERIMETER INTERCEPTOR DRAIN- APPROXIMATELY 380 LF) Install a 6' perforated perimeter drain time as Indicated In the detail drawing. Place 3/4' washed drain rock around perforated line. Wrap system with fitter fabric. Tie the perforated line to the existing drain system approximately 25' north of the stab via tight line. FENCE CONFIGURATIONi (Ali fabric to be 8 gauge galvanized. Ali posts and ralls to be Black VInyL Coated) Imbed appropriate galvanized metal pipe sleeves at a depth of 18' to accept 3' Schedule 40 Metal Corner Posts as shown on detail. Imbed appropriate galvanized metal pipe sleeves at a depth of 18' to accept 2 112' Schedule 40 Metal Central Posts as shown on the detail. Install 1 5/8' mid and bottom and top ralts In at( areas where the fence Is 6' or 10' high. Fasten top roll with knuckle fittings. Install 1 5/8' bottom and top ralts only where the fence Is 4' high. Fasten top ralt with knuckle fittings. Install 8 gauge galvanized 'cyclone' type fence fabric as depicted. Prior to Installing the fence Into the sleeves, the contractor will leave the site to allow for the Installation of the skateboard components by others. Following Installation of the components, the contractor will return and complete the Installation of the fence. 5/8' Chip Drain Rock — Fitter Fabric — Native Sand Base — Rebar PI-S (Typ) S 3 <T% V 6 -21 Track Where Required Slope ves Drain Terrain @ 2el (Tip)\ to create trarsl+lon to existIng ptay fIetd surface Seed I all dk-tllbed areas as required 0.0 3/ i I/ --+-- 1/ --�- 1/ Fitter Fabric 3/4' Washed River Rock Native Earth 6' Perforated Interceptor Line Wrapped With Fitter Fabric CONCRETE SLAB WITH THICKENED EDGE DETAIL AND PERIMETER INTERCEPTOR DRAIN DETAIL Civic Center Play Field Skateboard Park (E5MDC24J- ;Existing Garage Bultdir Construct 8' x 23' Concrete Stab to tie kate Park to exist TRe, mbed Track Dral Into Ickened Edge. 3' 5 01 127' 8 112 Tie track drains toneth e r with 14' ABS Sch 40 Tight line Ide staLL 2 1/2' dia sch 40 cent 'at post I ri West Fence 4' Hlgl.�� enIn Install Steel Sleeves 10' 3 112' O,C. Vertic Notei Dura Track Drain Slope DS0232 System maintains appropriate Internal grade Metal Ke� Wo,,., North Fence Expansion JoIrts 6' High 6'5' (typ South Fence 4 High 14'0' (typl Slope Concrete Stab 4- in 0 0. tA 2% to track drain 0 Q. — 15 L c u U U in U 14 'a ai CU CU d +- 0 in el Sleeves at 11' 3' O.C. Horizontally East;Fence 10, . HIgh—,,-,..� 0 ce C Instatt 2 1,121 d3m schzntr(Lt P,)Sts ---- Inst*tt 3'1 diameter sch 40 end looi;ts 1 .4 49' 2 1/2' -1 SCHEDULE I I SKATEBOARD STRUCTURE AND APPURTENANCES NOW M coam"it. S7XUCzW" C44 FV.6 it 3/4 it Lr 015044� W sper-S) rIIE TRACK DRAIN INTO DETENTION SYSTEM OUTA"."I"M- r- �—CONNECT DETENTION SYSTEM TO EXIST C.B. (25 if) p & �o I Iteg C 12 [- LINE PERIMETER E DRAIN INTO EXIST CB (25 if) (SCHEDULE 1) Innis In- fl- IN a C4 00 0 0 0 zZZO 02WI3 U) Z L,J ol 0 0 �g r, W r, ZEZ:z 0 -tR P� -J Li LL. LQ Ld < y —J W < CL LLI F— z LL1 U LJ > Z/5 U s" n.t.s. v. 5=z n.t.s. SHMT 1 SCHEDULE 2 DETENTION SYSTEM - (reV131On3F9:T3:0W— OF I SHEETS 20060928-0584 -g Date: TO: FROM: SUBJECT: CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.ci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering ADDENDUM NO. 1 October 11, 2006 All Plan Holders David K. Gebert, P.E., City Engineer xx� Civic Center Skateboard Park (E5MD/c233) GARY HAAKENSON MAYOR Please incorporate the following change into the Specifications and Contract Documents for the above -referenced project. PART I — BIDDING DOCUMENTS Invitation to Bid REPLACE Page iii with the attached Page iii-Addendurn 1, extending bid due date to 2:00 p.m. on November 14, 2006. PART III — SPECIAL PROVISIONS/GENERAL REOUIREMENTS Page SP-1 —Add Paragraph 6 as follows: 6. Pre -bid Site Visit — Another mandatory pre -bid site visit will be held on October 24, 2006 at 2:00 PM at the project site. All bidders shall be required to attend either this pre7bid site visit or the previous pre -bid site visit that was held on October 10, 2006. Any bid received from a bidder who did not attend one of these pre -bid site visits may be rejected at the sole discretion of the City. Contact Jim Roberts (425-771-0220) or Rich Lindsay (425-771-0230) with questions regarding the pre -bid site visit. Bidders must acknowled2e receipt of this addendum on Page P-5 of the Proposal form. CADOcuments and SatingsTurtiAMy Docunients\Engsec\PROJECrS\E5MD.Skateboard Park\Addendumi.Hid.doc 0 Incorporated August 11, 1890 " z 0 0 INVITATION TO BID CITY OF EDMONDS Sealed bids will be received at the office of the City Clerk at 121 Fifth Avenue North, Edmonds, Washington, until 2:00 P.m., November L4, 2006, for the construction of the Civic Center Skateboard Park and the furnishing of all labor, materials, and equipment necessary for this project. The sealed bids will be opened and publicly read aloud at 2:15 p.m., November 14, 2006 at the City Clerk's Conference Room, 121 Fifth Avenue North, Edmonds. Plans and specifications and form of contract documents may be examined at the office of the City Engineer located in the Development Services Department, 121 Fifth Avenue North, and a set thereof purchased for a non-refundable fee of $25 each. A certified check, cashier's check, or bid bond in the amount equal to at least five percent of the total amount bid, including sales tax, if applicable, must accompany each bid as evidence of good faith and as a guarantee that, if awarded the contract, the bidder will execute the contract and give a performance and payment bond as required. The check will be given as a guarantee that the bidder shall execute the contract in conformity with the contract documents if it is awarded to him and shall'provide a perfortriance and payment bond as specified therein within fifteen days after notification of the award of contract to the bidder. The City of Edmonds reserves the right to reject any or all bids, and to waive irregularities or inforinalities in the bid or in the bidding. No bidder may withdraw his bid after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding sixty days. Sandra S. Chase, City Clerk City of Edmonds, Washington iii — Addendum I