Loading...
314 5TH AVE S.PDF� III 1 11 11111111 5179 314 5TH AVE S Water Service Drawing I The City of Edmonds EASEMENT NO . ............................................ NEW CONSTRUCTION R REPAIRS R LID NO . .................. . ASMT. NO . .................. IT NO-q��q��kl OWNER.............. ... .. ............................................................. CONTRACTOR .................................................................................... PERM ......................... AL DESCRIPTION: LOT,.NO . ...................................... BLOCK NO . .................................. JOB ADDRESS ....... ........ ...... . ........ 5 ............. LEG .............................................................................................................................................................. I 31('0 NOTICE: 00 VARRAM OF AMMU. TM L*MdOn dmwn 'On 90 abchzd m* was comolad for un by do My d EbWW% 1b wwr-17-p-m- od conWtsnts. The My of E&MU 4= nd W&Md tW &WMq If ariybng set todh an the map. Any pefem 0 oft M*W" A 4W should cmduct an Wepiderd htqft leguft go MMWOR Ihm 49 63 UWA M&ft bd Rd IMW ft 00 10CdOn Of MY WM 06 dOft Such sew oh& may or may nd odd ar4 mq of MAY W Odd At 00 kc9on shm& N&w fm 04 d E&WrAs ra Is 94*YM Of dim Sha bO UAWO tOf ffM 1ftf0FMd00 fVW On 01006 w fu ol ord npoaftdon pwi&d buW q= ON M* t WAV-0001-1 1175 (REV.! 1178) NAMEOF ADDITION ..: ............................................................................................ ....................... - —11 !! I 11�� $11 ljj:�� , 111,11", : Zi i: 7 No. a) 4- Q rY Lo 5' 6 -a) App-oved: DATE......... ... . ............ B, ............................... Site Improvement Bond Quantity Worksheet S15 Webdate: 02/22/2013 La King County Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600. 206-296-6600 TrY Relay 711 Project Name: Date: Location: Project No.: Activity No.: Clearing greater than or equal to 5,000 board feet of timber? yes If yes, Forest Practice Permit Number: (RCW 76.09) Rv-e- Page 1 of 9 Site Improvement Bond Quanity Worksheet.xls 1001 17- Z-, —7 / Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. --r - Ose" = A S4el r4ovJ -* es- yo r! Unit prices updated: 02/12/02 Version: 11/26/2008 Report Date: 3/26/2014 Site Improvement Bond Quantity Worksheet S15 Webdate: 02/22/2013 Reference # Unit Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTROL Number Backfill & compaction -embankment ESCA $ 5.62 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditching ESC-4 $ 8.08 CY Excavation -bulk ESC-5 $ 1.50 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF Fence, Temporary (NGPE) ESC-7 $ 1.38 LF Hydroseeding ESC-8 SWIDM 5.4.2.4 $ 0.59 SY 40 2— Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY Mulch, by hand, straw, 3" deep ESCA 0 SWDM 5.4.2.1 $ 2.01 SY Mulch, by machine, straw, 2" deep ESCA I SWDM 5.4.2.1 $ 0.53 SY Piping, temporary, CPP, 6" ESC-12 $ 10.70 LF Piping, temporary, CPP, 8" ESC-13 $ 16.10 LF Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF Plastic covering, 6mm thick, sandbagged ESCA 5 SWDM 5.4.2.3 $ 2.30 SY Rip Rap, machine placed; slopes ESCA 6 WSIDOT 9-13.1(2) $ 39.08 CY Rock Construction Entrance, 50'xl5'xl' ESCA 7 SWDM 5.4.4.1 $ 1,464.34 Each Rock Construction Entrance, 1 00'xl 5'xl' ESCA 8 SWIDM 5.4.4.1 $ 2,928.68 Each Sediment pond riser assembly ESCA 9 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWIDM 5.4.5.1 $ 17.91 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWIDM 5.4.5.1 $ 68.54 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY ESC-23 SWDM 5.4.2.5 $ 6.03 SY Sodding, 1 " deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY TESC Supervisor ESC-25 $ 74.75 HR Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR WRITE -IN -ITEMS **** (see Dacie 91 Each ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 Site Improvement Bond Quanity Worksheet.xis Unit prices updated: 02/12/02 Version: 11/26/2008 Report Date: 3/26/2014 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Quantity Completed (Bond Reduction)* Quant. Completel Cost T- Unit Price Unit QuantT. Cost Quant. Cost Quant. T Cost GENERAL ITEMS No. Backfill & Compaction- embankment G1 - 1 $ 5.62 CY Backfill & Compaction- trench G1 - 2 $ 8.53 CY Clear/Remove Brush, by hand G1 - 3 $ 0.36 SY Clearinq/Grubbing/Tree Removal G1 - 4 $ 8,876.16 Acre Excavation - bulk G1 - 5 $ 1.50 CY Excavation - Trench G1 - 6 $ 4.06 CY Fencing, cedar, 6'high G1-7 $ 18.55 LF Fencing, chain link, vinyl coated, 6'high G1 - 8 $ 13.44 LF Alow, 60 Fencinq, chain link, gate, vinyl coated, Z G1 - 9 $ 1,271.81 Each Fencing, split rail, Thigh G1 - 10 $ 12.12 LF Fill & compact � common barrow GI - 11 $ 22.57 CY Fill & compact - gravel base GI - 12 $ 25.48 CY Fill & compact - screened topsoil GI - 13 $ 37.85 CY Gabion, 12" deep, stone filled mesh G1 - 14 $ 54.31 SY Gabion, 18" deep, stone filled mesh G1 - 15 $ 74.85 SY Gabion, 36" deep, stone filled mesh G1 - 161 $ 132.48 SY Grading, fine, by hand G1 - 17 $ 2.02 SY Grading, fine, with grader G1 - 18 $ 0.95 SY Monuments, 3' long G1 - 19 $ 135.13 Each Sensitive Areas Sign G1 - 20 $ 2.88 Each Sodding, 1 "deep, sloped ground G1 - 21 $ 7.46 SY Surveying, line & grade G1 - 221 $ 788.26 Day Surveying, lot location/lines G1 - 231 $ 1,556,64 Acre Traffic control crew ( 2 flaggers G1 - 24 $ 85.18 HR Trail, 4" chipped wood G1 - 25 $ 7.59 SY Trail, 4" crushed cinder G1 - 26 $ 8.33 SY Trail, 4" top course G1 - 27 $ 8.19 SY Wall, retaining, concrete G1 - 28 $ 44.16 SF lWall, rockery JGI - 291 $ 9.49 SF Page 3 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Site Improvement Bond Quanity Worksheet.xls Report Date: 3/26/2014 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way I Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. I Comnlate� Cost Unit Price Unit Quant. Cost Quant. Cost Quant. Cost ROADIMPROVEMENT No. AC Grinding, 4'wide machine< 1000sy RI-1 $ 28.00 SY AC Grinding, 4'wide machine 1000-200( Rl - 2 $ 15.00 SY AC Grinding, 4'wide machine > 2000sy RI - 3 $ 7.00 SY AC Removal/Disposal/Repair RI - 4 $ 67.50 SY Barricade, type I RI - 5 $ 30.03 LF Barricade, type III ( Permanent RI - 6 $ 45.05 LF Curb & Gutter, rolled RI - 7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12.50 LF 016 0 Curb and Gutter, demolition and disposa RI - 9 $ 18.00 LF Curb, extruded asphalt RI - 101 $ 5.50 LF Curb, extruded concrete RI - 11 $ 7.00 LF Sawcut, asphalt, 3" depth RI - 12 $ 1.85 LF Sawcut, concrete, per. 1 " depth RI - 13 $ 1.69 LF Sealant, asphalt RI - 14 $ 1.25 LF Shoulder, AC, ( see AC road unit price ) RI - 15 $ - SY Shoulder, gravel, 4" thick Rl - 161 $ 15.00 SY Sidewalk, 4" thick R1 - 17 $ 35.00 SY Sidewalk, 4" thick, demolition and dispos RI - 18 $ 29.50 SY Sidewalk, 5" thick Rl - 19 $ 38.50 SY Sidewalk, 5" thick, demolition and dispos Rl - 20 $ 37.50 SY Sign, handicap RI - 21 $ 85.28 Each Striping, per stall RI - 221 $ 5.82 Each Striping, thermoplastic, ( for crosswalk RI - 231 $ 2.38 1 SF Striping, 4" reflectorized line RI - 241 $ 0.25 1 LF I Page 4 of 9 SUBTOTAL IWI - 50 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Site Improvement Bond Quanity Worksheet.xis Report Date: 3/26/2014 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way T Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. compietel Cost Unit Price Unit Quant. Cost Quant. I Cost Quant. T-Cost ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course� For'93 KCRS 6.5" Rock= 5" base & 1.5" top course) For KCRS'93, (additional 2.5" base) add RS - 1 $ 3.60 SY AC Overlay, 1.5" AC RS-2 $ 11.25 SY AC Oveday, 2" AC RS-3 $ 15.00 SY AC Road, 2", 4" rock, First 2500 SY RS-4 $ 21.00 SY AC Road, 2", 4" rock, Qty. over 2500SY RS - 5 $ 19.00 SY AC Road, 3", 4" rock, First 2500 SY RS-6 $ 23.30 SY AC Road, 3", 4" rock, Qty. over 2500 SY RS-7 $ 21.00 SY AC Road, 5", First 2500 SY RS-8 $ 27.60 SY AC Road, 5", Qty. Over 2500 SY RS-9 $ 25.00 SY AC Road, 6", First 2500 SY RS - 1 Q $ 33.10 SY AC Road, 6", Qty. Over 2500 SY RS - 111 $ 3000 SY Asphalt Treated Base, 4" thick RS - 1 $ 2000 SY Gravel Road, 4" rock, First 2500 SY RS - 1 $ 15.00 SY Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 $ 8.50 SY PCC Road, 5", no base, over 2500 SY RS - 1 $ 27.00 SY PCC Road, 6", no base, over 2500 SY RS - 1 $ 25.50 SY Thickened Edge RS - 1A $ 8.60 LF Page 5 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version.- 11/26/08 Site Improvement Bond Quanity Worksheet.xis Report Date: 3/26/2014 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant Completel Cost Unit Price Unit ------ Cost Quant. Quant. Cost Quant. I Cost DRAINAGE (CPP Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Av rage of 4'cover was assumed. Ass me perforated PVC is same price as solid pipe. Access Road, R/D D - 1 1 $ 21.00-1 SY-1 Bollards - fixed D-2 1 $ 240.74-1 Each Bollards - removable D-3 $ 452.34 1 Each * (CBs include frame and lid) CB Type I D-4 $ 1,257.64 Each CB Type IL D-5 $ 1,433.59 Each CB Type 11, 48" diameter D-6 $ 2,033.57 Each for additional depth over 4' D-7 $ 436.52 FT CB Type 11, 54" diameter D-8 $ 2,192.54 Each for additional depth over 4' D-9 $ 486.53 FT CB Type 11, 60" diameter D-101 $ 2,351.52 Each for additional depth over 4' D - 11 $ 536.54 FT CB Type 11, 72" diameter D - 12 $ 3,212.64 Each for additional depth over 4' D - 13 $ 692.21 FT Through -curb Inlet Framework (Add) D - 14 $ 366.09 Each Cleanout, PVC, 4" D - 15 $ 130.55 Each Cleanout, PVC, 6" D - 161 $ 174.90 Each Cleanout, PVC, 8" D - 17 $ 224.19 Each Culvert, PVC, 4" D - 18 $ 8.64 LF Culvert, PVC, 6" D - 19 $ 12.60 LF Culvert, PVC, 8" D - 20 $ 13.33 LF Culvert, PVC, 12" D - 21 $ 21.77 LF Culvert, CMP, 8" D - 221 $ 17.25 LF Culvert, CMP, 12" D-23 $ 26.45 LF Culvert, CMP, 15" D - 24 $ 32.73 LF Culvert, CMP, 18" D - 25 $ 37.74 LF Culvert, CMP, 24" D - 26 $ 53.33 LF Culvert, CMP, 30" D - 27 $ 71.45 LF Culvert, CMP, 36" D - 281 $ 112.11 LF Culvert, CMP, 48" D - 29 $ 140.83 LF Culvert, CMP, 60" D - 30 $ 235.45 LF Culvert, CMP, 72" D - 31 $ 302.58 LF Page 6 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Site Improvement Bond Quanity Worksheet.xis Report Date: 3/26/2014 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. Completel Cost No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Culvert, Concrete, 8" D - 32 $ 21.02 LF Culvert, Concrete, 12" D - 33 $ 30.05 LF Culvert, Concrete, 15" D - 34 $ 37.34 LF Culvert, Concrete, 18" D - 35 $ 44.51 LF Culvert, Concrete, 24" D - 36 $ 61.07 LF Culvert, Concrete, 30" D - 371 $ 104.18 LF Culvert, Concrete, 36" D - 38 $ 137.63 LF Culvert, Concrete, 42" D - 39 $ 158.42 LF Culvert, Concrete, 48" D-40 $ 175.94 LF Culvert, CPP, 6" D - 41 $ 10.70 LF Culvert, CPP, 8" D - 42 $ 16.10 LF Culvert, CPP, 12" D - 431 $ 20.70 LF Culvert, CPP, 15" D - 44 $ 23.00 LF Culvert, CPP, 18" D-45 $ 27.60 LF Culvert, CPP, 24" D-46 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP, 36" D - 48 $ 55.20 LF Ditching D - 491 $ 8.08 CY Flow Dispersal Trench (1,436 base+) D - 50 $ 25.99 LF French Drain (3'depth) D - 51 $ 22.60 LF Geotextile, laid in trench, polypropylene D - 52 $ 2.40 SY Infiltration pond testing D - 53 $ 74.75 HR Mid -tank Access Riser, 48" dia, 6'deep D - 54 $ 1,605.40 Each Pond Overflow Spillway D - 551 $ 14.01 SY Restrictor/Oil Separator, 12" D - 56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D - 57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D - 58 $ 1,146.16 Each Riprap, placed D - 59 $ 39.08 CY Tank End Reducer (36" diameter) D - 60 $ 1,000.50 Each Trash Rack, 12" D - 611 $ 211.97 1 Each Trash Rack, 15" D - 621 $ 237.27 Each ITrash Rack, 18" D - 63 $ 268.89 Each ITrash Rack, 21" D - 641 $ 30 .84 Each Page 7 of 9 SUBTOTAL Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Site Improvement Bond Quanity Worksheet.xls Report Date: 3126/2014 Site Improvement Bond Quantity Worksheet Web date: 12/02/2008 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Bond Reduction* Quant. Complete Cost T Unit Price Unit _Q`ua_nt_F Price Quant. Cost Quant. Cost PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 21.00 SY 2" AC, 1.5" top course & 2.5" base cour PL - 2 $ 28.00 SY 4" select borrow PL - 3 $ 4.55 SY 1.5" top course rock & 2.5" base course PL - 4 $ 11.41 SY UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Statement Utility Pole(s) Relocation Lump Sum Street Light Poles w/Luminaires I UP-21 Each I I WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. WI - 1 Each WI -2 SY WI - 3 CY WI -4 LF WI - 51 FT WI - 6 1 Wl - 7 Wl - 8 wl - 9 wl - 10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: B Page 8 of 9 D E Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 11/26/08 Site Improvement Bond Quanity Worksheet.xis Report Date: 3/26/2014 OV EDV 0 TP CITY OF EDMON 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: APPROVED ENG20130227 Permit Number: ENG20130227 Address of Public Use/Encroachment: 314 5TH AVE S. EDMONDS ARBO LLC 320 5TH AVE S EDMONDS, WA 98020-3401 architectural marque extending over sidewalk (originally permitted 2002) STREET USE. Placement of any temporary or movable objects in any portion ofpublic space or City right-of-way shall meet all code requirements as setforth in thefollowing chapters of the Edmonds Community Development Code. ENCROACHMENT. Permanent structures encroaching upon any portion ofpublic space, City right-of-way or easement area shall meet all Code Requirements as setforth in thefollowing chapter of the Edmonds Community Development Code. CODE APPLICATION. Chapter 18.70,17.65, and 17.70.040 of the Edmonds Community Development Code. All terms of the adopted ordinance are incorporated herein as if setforth in full and this permit therefore is subject to the terms of those chapters. FOR THE TERM IN WHICH THIS PUBLIC USEIENCROA CHMENT IS IN EFFECT, THE 0 KNER SHA LL COMPL Y WITH THE PERMIT CONDITIONS SET FOR TH B Y THIS PERMIT NOTE. The issuance of this permit is understood by the owner to be of a temporary nature, shall vest no permanent right and shall be issued and may in any case be revoked at the sole discretion of the City per ECDC 18.70.040. Applicant is responsible to provide a copy of the insurance certificate to the City at the beginning of each calendar year, no later than the 21st day of January. INDEMNITY. The Applicant understands and agrees to hold the City of Edmonds harmlessftoin any injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City ofEdmonds, or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs, court cost, and attorneyfees by reason ofgranting this permiL In addition, the applicant understands that helshe shall provide and continually maintain during the term of the permit a ceritificate of insurance naming the city as an additional insured, with respect to liability, andproviding that it shall be primary as to any otherpolicy of insurance. THIS APPLICATION IS NOT A PERNHT UNTIL SIGNED BY THE CITY ENGINEER OR HISMER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOwLEDGED IN el -I SPACE PROVIDED. RELEASED BY Printed: Wednesday. ADril 17. 2013 107-1190 F-] FILE COPY F--] INSPECTOR COPY [—] APPLICANT COPY STATUS: APPROVED ENG20130227 The proposal will not adversely impact public space open to vehicular or pedestrian travel. Architectural Design Board Approval has been granted or the process has been administratively approved. The proposal will not unreasonably interfere with the rights of the public. The proposal either benefits the public interest, safety or convenience (e.g., supports or protects the city street) or is an accessory structure such as fence normally associated with residential use of the property as fully complies with the requirements of criteria above. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00prn on weekdays and I 0:00arn and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fa this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to ehforce any ordinance provision. 0 None