Loading...
316 WALNUT ST.PDF11111111111111 13720 316 WALNUT ST ADDRESS: TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: al) /; le, wj Ye 5 > CRITICAL AREAS:. �/, Zle, DETERMINATION: 0 Conditional Waiver F] Study Required aiver 11 - DISCRETIONARY PERMIT #'S: _0 XW DRAINAGE PLAN DATED: S)Ie4 108 - dwl is (0) ZV3 -Qf 11110 k� V I I I PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: NIS SCALED PLOT PLAN DATED: I 12711YI, SEWER LID FEE LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: 111c�I-DE2 STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: LATEMP\DS'Ps\Fomis\Street File Checklist.doc CITY OF EDMONDS Nos, WA 98020 121 5TH AVE N. EDMO DEVELOPMENT SERVICES jgs�' z Z) lz�� PITNIV BOWES 02 1M $00-4611 9008007451 APRO3 2013 MAILED FROM ZIP CODE 9 80 20 Cascade Bank Assistant Branch Manager 437 Fifth Ave S, Suil- Edmonds, WA 9802; 980 5 E- I OG 04/05/13 RETURN TO SENDER �?94 T D.EL11,',E-'1ZAE1LE AS ADDRESSED 'Aj,.wAgLE TO F 1 0 R I. -VIA R D, 2 0 3 14 5 2 1 18 2 6 - 0 8 8 0 - 0 3 - 4 3 j q­j.­f CITY OF EDMONDS 03 A -FIR 20- . 121 5TH AVE N. EDMONDS, WA 98020 TrJIEV BOWES DEVELOPMENT SERVICES ';C. 02 1M $ 00.460 0008007451 APR03 2013 MAILED FROM ZIPCODE 980 20 Cascade Bank Assistant Branch Manager 437 Fifth Ave S, Sul:-- 4­1 V_ Edmonds, WA 9802 N G 5-E 1 00 .04-/ 0 5../ 1- 3 l)KETUR-N TO SENDER ELI.V RABLE AS ADDRESSED L E T 0 F 0 R W A RD M314521 *1826-04153-03-42 B C a� '01 '�j j I I I I I 11-1 f'j If Ii t'l I 11111 111. (tt"t? of eb oub DEPARTMENT OF BUILDINGS feelitttmte jet __Otc"An PER International Building Code Section I 10 At: Occupancy established by this certificate: R2/S2 Building -Permit # I __ Dwellina Units: **7** Type Construction: VA BLD2008-0031 No. Stories: 4 Basement: No Maximum Occupant Load 126** (Per IBC 1004) Room capacity signs, when required, must remain posted at all times. I Building Owner: Michel Construction Owner Address: 790t. 212t' St SW, #102: Edmonds, WA 98026 THE Michel 7 Unit Condo HAS BEEN INSPECTED AND APPROVED AS COMPLYING WITH THE REQUIREMENTS OF THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE AS ADOPTED BY THE CITY FOR THE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. Issued this 181h day- of March, 2011' CIAL This certificate shall be posted in a conspicuous public area and shall not be removed. mutilated or ob:��ed��.�sh.11 1. rr�aml.,. �.�dition at all times. Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. 1k sees 0 0, F.-A OV LI)Af CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDSWA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 fjp) C. C) STATUS: ISSLTED 2/13/2009 Pernit #: BLD20080031 BUILDING PERMIT Expiration Date: 2/13/2014 Project Address: 316 WALNUT ST, EDMONDSi Parcel No: 27032300414400 PROPERTYONVNER APPLICANT CONTRACTOR 316 WALNUT ST CONDO MICHEL CONSTRUCTION MICHEL CONSTRUCTION 7907 212TH ST SW # 102 7907 212TH ST SW # 102 7907 212TH ST SW # 102 DWIGHT MCGREW EDMONDS, WA 98026 EDMONDS, WA 98026 EDMONDS, WA 98026 425-776-2211 425-776-2211 425-776-2211 LICENSE #: MICHECIO61 D5 EXPA/19/201 0 7 UNIT CONDOMINIUM - MCLUDES RETAINING WALJ, TRASH ENCLOSURE AND 3 FT RAIL FENCE TO BE RELOCATED EPROPERTYUNE) VALUATION: $1,871,450 Ps 6 141 P -IL =Ec T F D PERMIT TYPE: Commercial PERMIT GROUP: 6 - Apartmcnt/Condo New GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: VA RETAININGWALLROCKERY: Y OCCUPANT GROUP: R2/S2 OCCUPANT LOAD: 126 FENCE: Y ( 0 X 0 FT.) CODE: 2006 IBC OTHER: N ------- OTHER DESC: IZONE: RM-1.5 INUMBER OF STORIES: 4 1 VESTED DATE: INUMBER OF DWELLING UNITS: 7 ILOT #: LXISTING AREA PROPOSED ARE-k BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 6087 2ND FLOOR: 5843 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 5709 GARAGE: 6369 DECK: 1336 OT HER: 0 FRONTSETBACK SIDESETBACK REARSETBACK REQUIRED: N 15 PROPOSED: 16.5 IREQUIRED: W 10 PROPOSED: � �REQUIRED: E 15 PROPOSED: 15 HEIGHT ALLOWED:30 PROPOSED:29.65 I REQUIRED: S 10 PROPOSED: 12.9 SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIArOR HISfHER DEPUTY AND ALL FEES ARE PAID. Signature 1-?W.11, #/ c b�:2- ,,2 -,12- of ( V1 911311,9 ATTENTION ag-ed IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED, UBCI 09/ IBCI I 0/JRCI I 0.� ARCHIVE APPUCkNT ASSESSOR T. STATUS: ISSUED BLD20080031 0 SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING: By the Geotechnical Engineer of Record I . Fmavation, grading and site preparation, including backfill of foundation waIls 2. Shoring installation and monitoring 3. Soil bearing verification r 4. Foundation drainage r 5. Final Letter from Geotechnical Engineer of Record 6. General Site Monitoring During Wet Weather construction By WABO Special Inspector or State licensed Professional Engineer: I . Structural Steel Construction 2. Concrete 1 3. Reinforcing Steel 4. High Strength Bolting 5. Wood Construction, including shear walls (nailing 4" o.c. or less), wood diaphragms, drag struts and holddowns 6. Welding By a Qualified Building Enclosure Inspector: oe 1. Building Enclosure - Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required FromAll Special Inspectors. Subrnit Special Inspection Field reports on a weekly basis to the City Building Department. • Separate Permit/SubrTiittals Required For: Plumbing, mechanical, fire sprinkler, fire alarm, fire connection, state electrical, state elevator, firestopping assemblies, shop drawings for floor and roof trusses, signs, emergency guide, maintenance bond, building enclosure inspector quafifications, side sewer, water service line and water meter, right of way construction, landscaping and irrigation system • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, exended, re -built or relocated electrical utility and/or service shall be placed underground. • Seperate Permit Required For: • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Cbeck the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specificatly requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Fences, gates, and arbors shall be located on private property. Property owner responsible for determining property lines. Fence shall not enclose or prevent access to any City maintained utilities. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise lirnits of ECC Chapter 5.30 only during the hours of 7:00arn to 6:00prn on weekdays and I 0:00arn and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible firomthe street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a '/2 inch min. stroke width on a contrasting background. I INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT., SEE ECDC 19.00.005(A)(6) I BUMDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 ME (425) 771-0215 1 I PUBLIC WOMS (425) 771-0235 1 PR&TREATMENT (425) 72-5755 1 RECYCLING (425) 275-4801 IWhen calling for an inspection please leave the follo-Mirig information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. I • B-Retaining Wall Forms/Location • E-Fire/Aid Address Sign • E-Engineering Final • B-Setbacks • B-Footings • B-Foundation Wall • B-Isolated Footings/Piers • 13-Retaining Wall • B-Slab Insulation • B-Plumb Ground Work • B-First Floor Framing • B-Plumb Rough In • B-Gas Test/Pipe • B-Equipment-Mech • B-FAerior Sheathing • 13-ShearNailing • B-Height Verification • B-Framing • 13-Wall Insulation/Caulk • B-Floor Insulation/Caulk • B-Ceifing Insulation/Caulk • B-Sheetrock Nail • B-Building Final • F-F-dinguishers • F-Fire Dept Inspection • F-Addressing Visibility • F-Fire Final • P-Planning Final • B-Hydronics • X-Special Inspection Mf I's H rmw L 'UCTION INC. July 3, 2008 Alex Moroseos ' Custom Design and Engineering, Inc. 11006 60'h Ave. West Mukilteo, Washington 98275 1,!1rHOF1LM -k HOLD HARMLESS AGREEMENT This Hold Harmless and Indemnification Agreement ("Agreement") is entered into by and between Michel Construction Inc., a Washington Corporation, hereinafter "Promisor", and Custom Design and Engineering . Inc., a Corporation, hereinafter "Promisee", on this3L�_day o 2008, in Edmonds, Washington. Recitals Promisor desires to construct a condominium building located at 316 Walnut St., Edmonds, Washington. Agreement For consideration received, Promisor waives any claims, demands or, 4 causes. of action that it may make against Promisee or its officers, directors or employee ' s related in any way to defects in the building envelope of the building -to be built at 316 Walnut St. in Edmonds, Washington (-the Project-), whether caused by design deficiencies,'construction deficiencies or a combination thereof. The claims waived hereby include claims for direct, indirect and consequential damages and include, without limitation, claims based on negligence breach, of contract, breach of expressed or implied warranty and indemnification or contribution. Further for consideration received, Promisor covenants that it shall not assign any interest in any agreement between Promisor and Promisee relatedRESUB the Project, whether-4uring or after performance, to any person or entity. UL 10 2008 51� 613IN&WAOF M rr'6V N 7907-212THSW,#102 - ED.MON-DS,WA98026 - (425)776-2211 - FAX(42-5)778-9086 - #MICHEC106IDS Further for consideration received, and. to the extent permitted by applicable law, Promisor will defend, indemnify and hold harmless Promisee and its officers, directors and employees from. any and all claims, actions an . d judgments arising out of or related in anyway to actual or alleged deficiencies in the building einvelope of the Project, regardless of cause or alleged cause. Promisee shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event Promisor shall indemnify and hold harmless Promisee for any such claims paid, including Promisee's reasonable attorney's fee's incurTed resulting from such claim. In the event any claim or suit is. brought against Promisee within the�:Scope of this Agreement, Promisor shall pay for legal counsel chosen by Promisee to defend against same. In the event either party files suit in a court of law to interpret or to enforce the terms of. this Agreement, the party prevailing in such action shall be entitled, in addition to any legal fees and costs incurred in defending against any third party claim, to its reasonable legal fees and costs incurred in such action to interpret or to enforce the terms of this Agreement This Agreement shall be interpreted under the laws of the state of Washington. esign and Engineering Inc. K..t 1. 4 A Alex K. Moroseos VE. I&MUZ Vice President 0631 4p ju� NQL,. CUSTOM DESIGN & ENGINEERING, INC. 1100660 TH Ave West Mukilteo WA 98276 (425) 343-7517 — fax (425) 493-8388 July 3, 2008 References: 316 Walnut, Edmonds Washington House Bill 1848 Structural Analysis Structural Design Design Services Upon review design drawings and documents provided by the architect, I find that these satisfy the, rNijimmots of w-tiQns 1 thrgpgh 10 of the, 4bgve, m-f0ogf"d A.�t (How, Bill 1848). An independent inspector shall verify compliance of said documents and provide report(s) to the building department, architect, developer and to our office. Alex K Moroseos, PE, SE E rA^FIM RESUB JUL 10 2008 BLWN&WAg%E"T M S 0 9 CONSTRUCTION - - a AMU"& Diane Glenn OF WASHINGTON, LLC August 29, 2008 Michel Construction, Inc. 7907 212" St. SW, #102 Edmonds, WA 98026 Re: 616 Glen St. Edmonds,, WA Condominium units Final inspection report for 616 Glen St. Edmonds, WA All inspections performed at the project were based on the builder's specifications, product manufacturer's specifications, and project plans. All references made are to the plans and specifications developed specifically for the project. as submitted to the City of Edmonds. Course of construction inspections were performed of the building enclosure for the purpose of quality application of material to meet plans and specifications. Construction of the building enclosure has been constructed insubstantial compliance with requirements of Engrossed BB 1848. Inspections were performed by Construction Consultants of Washington for the following: Window flashing materials Window installation Sliding door flashing Sliding door installation Weather Barrier material Siding material and trim Office (425)709-6100 Cell (425)351-0940 40 Lake Bellevue, Suite 100, Bellevue, VA 98005 0 0 Stone material Deck flashing and wall caps Roof material and flashing Other exterior flashing details Water penetration resistance testing of a representative sample of windows and sliding doors was performed with an induced air pressure difference. All tests performed passed with no failures. Windows and sliding doors (Alpine): Window and sliding door nailing was inspected for nailing per product manufacturer's specifications. All areas inspected were completed with no outstanding correction items. Weather barrier (Fortifiber Jumbo Text The weather barrier material (building paper) was inspected for installation to manufacturer's specifications and building code. Consultations were performed in the field to assure siding company had a clear understanding of procedure and- a consistent follow through. The weather barrier was inspected to assure no tears, gaps or missing areas. Inspection was made for correct overlap of material and taping or sealing of all penetrations. Building paper was installed with 20" minimum overlap creating two layers at wall. All areas inspected were completed with no outstanding correction items. Flashing (Waterblock system): Window and slidmig door flashing was inspected for correct application of material per product'manufacturer's recommendations. Flexible flashing (Waterblock) was installed before window installation at sides and bottom of windows. Flexible flashing (Waterblock) was installed after building paper at the sides of the windows. All areas inspected were completed with no outstanding correction items. Flashing (me1jl Areas were inspected for correct application of metal flashing over all wood trim. All areas inspected were completed with no outstanding correction items. Doors: Man doors were inspected for installation per builder" s specifications. All sills were inspected for correct sealing against water intrusion. All areas inspected were completed with no outstanding correction items. Decks: Deck flashing was inspected for correct application of flashing at deck to wall areas. Deck surfaces at decks were inspected for correct application of materials to assure consistency and for prevention of water intrusion. Deck wall caps were inspected for sealing of joints and flashing at wall connections. Decks are constructed with a solid surface and a scupper system to drain water to the outside. All areas inspected were completed with no outstanding correction items. Siding (cedar Igp and shake): All siding and trim was inspected for correct installation per product manufacturer's and builder's specifications. Inspections were performed for complete application of all siding pieces and trim. Inspections were performed for sealing of all penetrations at siding. All areas inspected were completed with no outstanding correction items. Roofing flashing - Roof flashing was inspected for correct installation at all required locations before installation of roofing. All flashing at eaves was inspected for correct application by product manufacturers, builder's specifications and building code. All area inspected were completed with no outstanding correction items. 0 0 MasopM. Stone areas were inspected for correct installation per product manufacturer's and builder's specifications. Inspections were performed for complete application of all stone areas and installation of metal flashing at ledges. All areas inspected were completed with no outstanding correction items. Final: All exterior material applications are completed to builder's specifications, manufacturer's specifications, building code, and good building industry standards. This letter will serve as notice that the building enclosure has been inspected during the course of construction and is in substantial compliance with the building enclosure design documents submitted to the City of Edmonds as part of the plans as required by Engrossed HB1848. ImittedZZ Diane Glenn The Construction Consultants Building Enclosure inspector 0 .LAUTYTISTINGiNc. 3310 Hill Avenue, Everett, WA 98201 Phone: (425) 259-6799 FAX: (425) 259-4936 email: info@qtitest.com WATER LEAKAGE FIELD TEST REPORT FT2008-415 REPORT TO: MICHEL PROPERTIES 7907212 TH SW 5 #102 EDMONDS, WA 98020 TEST DATE: 06/18/2008 REPORT DATE: 06/19/2008 PRODUCTS: TWO WINDOW SYSTEMS AND ONE SLIDING GLASS DOOR SYSTEM AS INSTALLED AT THE 161 GLEN STREET PROJECT LOCATED IN EDMONDS, WA. 10 FT2008415 Page I of 5 EOAO A 0 11TY L�A Hit ING K 3310 Hill Avenue, Evereft, WA 98201 Phone: (425) 259-6799 FAX: (425) 259-4936 email: info@qtitest.com REPORT TO: Michel Properties - 7907 212' SW, #102 Edmonds, WA 98026 TEST DATE: 6/18/2008 TEST STANDARDS/MIETHODS: AAMA 502-02 Voluntary Specification for Field Testing of Windows and Sliding Glass Doors. ASTM E 1105-00 Standard Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Curtain Walls, and Doors by Uniform or Cyclic Static Air Pressure Difference. TEST PURPOSE: Testing was performed on 2 window system and I sliding glass door systems as installed at the Ifat Glen St. project located in Edmonds, WA. 4 i 6 TEST CONDITIONS: Conditions on 06/18/2008 at the time of testing were cloudy skies, wind conditions calm-10 mph, with the outside ambient air temperature from 50* to 60' Fahrenheit. - TMS SPACE LEFT INTENTIONALLY BLANK - FT'2008-415 Page 2 of 5 EOAO 0 0 ASTM E1105-00 EQUIEPMENT A spray nozzle grid was formed using a spray rack consisting of two columns wide by three rows high. The nozzles used were "Full -Jet 1/4 HH 12 SQ' manufactured by Spraying Systems Company. A gate valve and pressure gauge were used at the inlet of the spray rack header to measure and control the water supply. The spray rack was spaced 48" from the exterior face of the test sample and the water pressure adjusted to 25-30 psi. matching the calibration conditions necessary to apply a uniform spray pattem.at a rate of five gallons per hour per square foot of tested surface area. The rainfall equivalent of the water delivery is 8" of rain per hour. A test chamber consisting of 1 x 4 lumber and 10 mil clear poly -vinyl was installed around the rough opening on the interior side. A vacuum motor with a variable speed controller and a 2 inch gate valve was used to create the specified test pressure through a 2 inch diameter semi - flexible hose. The hose was attached to the clear vinyl with a flange and quick connect system. The pressure was monitored with a Dwyer Digital Manometer. This gage gives a digital read-out in 0.0 1 inch of water increments. The pressure tap consisted of clear vinyl tubing. The pressure tap was placed in the diagonally opposite comer of the test sample from the pressure hose. EQUIPMENT CALIBRATION The calibr-ation of all equipment used was in ftill compliance with the calibration requirements of ASTM E 1105-00 at the time of testing. TEST SAMTLE DESCRIPTIONS AND RESULTS TEST SAMYLE NUMMER ONE (TESTED ON 06/18/2008): LOCATION: Unit 102, First Floor, East Elevation, Living Room. CONFIGURATION: 6'wide by 8'high, OY, Sliding Glass Door, TEST RESULTS: Failed: Water leakage was noted coming through the pan in the lower left hand comer, thirty seconds into the first of three 5 minute cycles at 2.86 psf. NOTE: The back leg of the pan was caulked and the window was retested at its full rating of 3.75 psf. TEST RESULTS: Passed: No water leakage noted after three 5 minute cycles at 3.75 psf, FT'2008-415 Page 3 bf 5 EOAO 0 0 TEST SAMPLE DESCRIPTIONS AND RESULTS (CONTINUED TEST SAMPLE NUMBER TWO (TESTED ON 06/18/2008): LOCATION: Unit # 102, First Floor, East Elevation. CONFIGURATION: 4' wide by 5' high, OX, Horizontal Slider, utilizing a passive air vent over the fixed lite. TEST RESULTS: Passed: No water leakage noted after three 5 minute cycles 2.86 psf NOTE: The test pressure was bumped up to 3.75 psf and the window was retested. TEST RESULTS: Passed: No water leakage noted after three 5 minute cycles 3.75 psf TEST SAMPLE NUMBER THREE (TESTED ON 06/18/2008): LOCATION: Unit # 102, First Floor, East Elevation. CONFIGURATION: Twide by 5'6" high, Picture Window. TEST RESULTS: Passed: No water leakage noted after three 5 minute cycles 4.0 psf - This space left intentionally blank - I FT'2008-415 Page 4 of 5 EOAO The results within this report were secured by using the designated test methods. The above test results indicate compliance with the above referenced test methods. This report does not constitute certification of this/these product(s), which may only be granted by the Administrator of the Certification Program. No test can wholly eliminate uncertainty regarding the potential for water penetration. Our test is intended to reduce, but not eliminate, uncertainty regarding the potential for water penetration at a designated site. This report is based on conditions that existed at the time the test was performed. The fitidings and conclusions of this report may be affected by the passage of time and by events such as weathering, vibration, expansion, and contraction. Our services have been executed in accordance with generally accepted practices for this type of test that are in effect at the time this report was prepared. No warranty or other conditions, express or implied, should be understood. This report is the joint property of Quality Testing, Inc. and the Client to whom it is issued. Permission to reproduce this report by anyone other than Quality Testing; Inc. and the Client must be granted in writing by both of the above parties. This report may not be reproduced except in its entirety. The results in this report are actual -tested values and are applicable to the sample(s) tested only. 1 2� Jeffrey M. Douglas Structural & Field Test Manager Nathan R Van Voorst Field Test Technician FT2008-415 - Page 5 of 5 EOAO NO. 4� I F, 2 FEB,12.2009.. 2:40PM H AT L I S� UCTION,, INC. MICROFILM February 12, 2009 Ann Bulbs Buildincy Official 0 City of Edmonds 121 5th Avenue North Edmonds, Washington 98020 Re: BLD2008-0031 CONTPLACTOR RESPONS113ELITY Site Address: 316 Walnut St. Dear Ms. Bulbs: 0 FEB 12 2033 WILDING DEPARNEK7 CM OF EDMONDs This letter serv.es to acknowledge Michel Construction Inc. as responsible for the following special inspections noted on P1 of the construction documents item #43 and qualified by item #42: 43, EXCAVATION, GRADING AND SITE PREPARATION, INCLUDING 5ACKFILL OF FOUNDATION WALL5, SHORING INSTALLATION AND MONITORING, 501L 15EAKING VERIFICATION, FOUNDATION DRAINAGE, AND FINAL LETTER. FROM THE GgOTECHNICAL 9NOINEE-F, OF 99CORP. 5Y WA950 IN&FECT09 OK,5TAT9 �ICEN5RP PKOFE55INAL ENGINEER: CONCRETE, STRUCTU RAL 5TEEL CONSTR., INCLUDING 5HEARWALL5 (NAILING *�O.C. OK LE55), WOOD DIAPHRAGMS, QKAG STRUTS AND HOLDOWN5, WELDING. 42, SPECIAL INSPECTIONS HAVE 13EEN CALLED FOR, ON THIS PROJECT & AKE NOTEP ON THE APPROVED CONSTRUCTION PLANS & DUILDING PERMIT. IT IS THE OWNER WOK CONTRACTORS KESPONSIDLRY TO A55UKE THAT REPOR —15 AKE PROVIDED To THE CITY IN A TIMELY MANNER. DE ADV15E[)--IF SPECIAL INSPECTION KEFOKT5 AKE NOT FORTHCOMING, THE f5UILDING OFFICIALS MAY 155UE A STOP WOkORDEK & No CITY INSPECTIONS WILL 15E PROVIDED UNTIL SUCH TIME A5 THE KEFOKTING AGENCY HA5 COMPLIED & REPORTS AKE REVIEWED & APPROVED 13Y THE CITY. We acknowledge: 1. We are aware of the special requirements contained in the statement of special inspections. 7907 - 212TH SW, #102 - EDMONDS, WA 98026 - (425) 776-2211 - FAX (425) 775-9086 e #MICHEC1061D5 FEB.12,2009 2:40PM 0 NO. 4� I P. 3 2. Control will be exercised to obtain conformance with the construction documents approved by the building official. 3. Procedures for exercising control within the contractor's organization, the method and frequency of reporting and the distribution of the reports; and 4. Identification and qualification of the person(s) exercising such control and their positions(s) in the organization. If you have any further questions please call or e-mail. Thank you, 'K�4- � t'4/ Robin W. Michel President Michel Construction Inc. 425.776.2211 michelbz@nwlink.co CUSTOM DESIGN & ENGINEERING,, INC STRUCTURAL ANALYSIS & DESIGN FIELD REPORT Date: February 17, 2009 Reference project: 316 WALNUT STREET, EDMONDS Permit No: #20080031 We performed an on -site visit at the above referenced project to inspect the continuous footing reinforcement. We found the reinforcement size, spacing and the footing width meets our design intent. av'�' a ?Fot�-� - &) Below are pictures of the footings inspected. 11006 60TH AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 0 ' 1 0.1 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN 11006 6CP AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 0 0 CUSTOM DESIGN & ENGINEERING, INC Alex K Moroseos, P.E., S.E. STRUCTURAL ANALYSIS & DESIGN 11006 60TH AVE W EST - M U KI LTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 q OCT-23,2010 11:20AM NO. 137 P. 1 4 0 is Mc TRUCTION Mki-ROFILM. &S� Diane Glenn OF WASHINGTONr LLC September 10, 2010 UP 2 9 201D Michel Construction, Inc. 7907 212" St. SW, #102 Edmonds, WA 98026 Ref- 316 Walnut St. Edmonds, WA Condominium units Final inspection report for 316 Walnut St., Edmonds, WA All 'inspections performed at the project were based on the builder's specifications, product manufacturer's specifications, and project plans. All references made aTe to the plans and specifications developed specifically for the project as submitted to the City of Edmonds. Course of construction inspections were performed of the building enclosure for the purpose of quality application of material to meet plans and specifications. Construction of the building enclosure has been constructed in substantial compliance with requirements of Engrossed BB 1848. Inspections were performed by Construction Consultants of Washington for the folloNving-. Window flashing materials Window installation Sliding door flashing Mce (425)709-6100 Cell (425)351-0940 40 Lake Bellevue, Suite 100, Belleyue, WA 98005 OCT-23,2010 11:20AM % 0/ 0 NO, 137 P. 2 Sliding door installation Weather Barrier material Siding waterial =d trim, Stone material Deck flashing and wall caps Roof material and flashing Other exterior flashing details Water penetration resistance testing of a representative sample of windows and sliding doors was performed with an induced air pressure difference. yLmdows and sliding doors LAW ae: Window and sliding door nailing was inspected for nailing per product matufacturer's specifications. All areas inspected were completed with no outstanding correction items. Weather barrier (Eortifiber Jumbo Tex).: The weather barrier material (building paper) was inspected for installation to manufacturer's specifications and building code. Consultations were performed in the field to assure siding company had a clear understanding of procedure and a consistent follow through. The weather barrier was inspected to assure no tears, gaps'or missing areas. Inspection was made for correct overlap of material and taping or sealing of all penetrations. Building paper was installed with 2V minimura overlap creating two layers at wall. All areas inspected were completed with no outstanding correction items. Flasbing (Sure Flash System): Window and sliding door flashing was inspected for correct application of material per product manufacturer's recommendations. Flexible flashing (Sure Flash) was installed before and after window installation per manufacturer's system recommendations, Specifications are allached to this report. All areas inspected were completed with no outstanding correction items. OCT,23.2010 11:21AM N 0. 1317 P. 3 Flashing (metal) Area were inspected for correct application of metal flashing over all wood trim, All areas inspected were completed with no outstanding correction items. Doors: Man doors were inspected for installation per builder's specifications, All sills were 'inspected for correct scaling against, water intrusion, All areas inspected were completed with no outstanding correction items. Decks: Dark flashing was inspected for correct application of flashing at deck to wall awas. Deck surfaces at decks were inspected for correct application of materials to assure consistency and for. prevention of water intrusion. Deck wall caps were inspected for sealing ofjoints and flashing at wall connections. Decks are constructed with a solid surface and an open railing system. All areas inspected were completed with no outstanding correction items, Siding (cedar lqR and sh&je-. All siding and trim was inspected for correct installation per product manufacturer's and builder's specifications. Inspections were performed for complete application of all siding pieces and trim. Inspections were performed for scaling of all penetrations at siding. All areas inspected were completed with no outstanding correction items. Roofing flashinw. Roof flashing was inspected for correct installation at all required locations before installation of roofing. All flashing at eaves was inspected for correct application to builder's specifications. All area inspected were completed with no outstanding correction items. Masom.. Stone areas were inspected for correct 'installation per product manufacturer's and builder's specifications. OCT-23,2010 11:21AM NO.137 P. 4 1 1 1 0 ie inspections were performed for complete application of all . stone areas and installation of metal flashing at ledges. All areas inspected were cmupletod wiih no outstanding correction item. Water penetration resistance testing of a representative sample of windows and sliding doors was performed with an induced air pressure difference. Final: All exterior material applications am completed to builder's specifications, manufacturer's specifications, building code, and good building industry standards. This letter will serve as notice that the building enclosure has been inspected during the course of construction and is in substantial compliance with the building enclosure design documents submitted to the City of Edmonds as part of the plans M required by Engrossed BB 1848 bmitted b ZL Diane Glenn The Construction Consultants Building Enclosure inspector Height Calculation Worksheet Date hl, i R 0 R L M Pem-lit NU er_ZX6 023.1 Address-3�& w&4bA, zA, inspector Average Grade �3,3 Max Height (25'+Ave.) Et� �,), & 1-7/ Actual Height (A+B+C) r 1-2.-1 1 -?" K Elevation of Transit (B) 69 1 Iq Datum C(,,� �� WIA-levation (A) 15(4p- =(C 0) )CO STRUCTION 97 OF WASHINGTON, LLC SEP 2 9 2010 September 10, 2010 Michel Construction, Inc. 7907 212"' St. SW, #102 Edmonds, WA 98026 Re: 316 Walnut St. Edmonds, WA Condominium units IR E C E I V E D OCT 0 4 2010 OEVELOPMENT SERVICES CTR. CITY OF EDMONDS k it , i -%Aft IL ill"' �A.0 F m Final inspection report for 316 Walnut St., Edmonds, WA &��,# -goo ? - 00 g ) Diane Glenn All inspections performed at the project were based on the builder's specifications, product manufacturer's specifications, and project plans. All references made are to the plans and specifications developed specifically for the project as submitted to the City of Edmonds. Course of construction inspections were performed of the building enclosure for the purpose of quality application of material to meet plans and specifications. Construction of the building enclosure has been constructed in substantial compliance with requirements of Engrossed BB 1848. Inspections were performed by Construction Consultants of Washington for 'the following: Window flashing materials Window installation Sliding door flashing Office (425)709-6100 Cell (425)351-0940 40 Lake Bellevue, Suite 100, Bellevue, WA 98005 0 Sliding door installation Weather Barrier material Siding material and trim Stone material Deck flashing and wall caps Roof material and flashing Other exterior flashing details Water penetration resistance testing of a representative sample of windows and sliding doors was performed with an induced air pressure difference. Windows and sliding doors (Alsidej- Window and sliding door nailing was inspected for nailing per product manufacturer's specifications. All areas inspected were completed with no outstanding correction items. Weather barrier (Fortifiber Jumbo Tex): The weather barrier material (building paper) was inspected for installation to manufacturer's specifications and building code. Consultations were performed in the field to assure siding company had a clear understanding of procedure and a consistent follow through. The weather barrier was inspected to assure no tears, gaps or missing areas. Inspection was made for correct overlap of material and taping or sealing of all penetrations. Building paper was installed with 20" minimum overlap creating two layers at wall. All areas inspected were completed with no outstanding correction items. Flashing (Sure Flash SysLemh Window and sliding door flashing was inspected for correct application of material per product manufacturer's recommendations. Flexible flashing (Sure Flash) was installed before and after window installation per manufacturer's system recommendations. Specifications are attached to this report. All areas inspected were completed with no outstanding correction items. 0: 0, Flashing (metal) Areas were inspected for correct application of metal flashing over all wood trim. All areas inspected were completed with no outstanding correction items. Doors: Man doors were inspected for installation per builder's specifications. All sills were inspected for correct sealing against water intrusion. All areas inspected were completed with no outstanding correction items. Decks - Deck flashing was inspected for correct application of flashing at deck to wall areas. Deck surfaces at decks were n spected for correct application of materials to assure consistency and for prevention of water intrusion. Deck wall caps were inspected for sealing ofjoints and flashing at wall connections. Decks are constructed with a solid surface and an open railing system. All areas inspected were completed with no outstanding correction items. Siding (cedar IgR and shgkgl All siding and trim was inspected for correct installation per product manufacturer's and builder's specifications. Inspections were performed for complete application of all siding pieces and trim. Inspections were performed for sealing of all penetrations at siding. All areas inspected were completed with no outstanding correction items. Roofing flashin&. Roof flashing was inspected for correct installation at all required locations before installation of roofing. All flashing at eaves was inspected for correct application to builder's specifications. All area inspected were completedwith no outstanding correction items. MasopW. Stone areas were inspected for correct installation per product manufacturer's and builder's specifications. Inspections were performed for complete application of all stone areas and installation of metal flashing at ledges. All areas inspected were completed with no outstanding correction items. Water penetration resistance testing of a representative sample of windows and sliding doors was performed with an induced air pressure difference. Final: All exterior material applications are completed to builder's specifications, manufacturer's specifications, building code, and good building industry standards. This letter will serve as notice that the building enclosure has been inspected during the course of construction and is in substantial compliance with the building enclosure design documents submitted to the City of Edmonds as part of the plans as required by Engrossed HB 1848. S itted by: iane Glenn The Construction Consultants Building Enclosure inspector 'W� MICHEL PROPERTIES OCT 0 DEVELOpIWENT S OF E ERVfCES CITY DMI CTR - ONDS ME ��l 7907 212fh SW, #102 Edmonds, WA 98026 P (425) 776-2211 F (425) 778-9086 www.MichelProperties.com #1,11CHECI061D5 FEB. 7,2011 3:27AM NU. Nofthefn%em In IRRIGATION & LANDHAPE LIQNTING PO Box 1293, Edmonds, WA 98020 1-800-459-7785 / Ph 425-672-9242 / Fax 425-672-4350 ANNUAL BACKFLOW PREVENTION ASSEM13LY TEST REPORT j z I r , i MiCAOFILM ACCOUNT#: METER# ASSEMBLY IDN NAMEOFPREMISE VOMW4 7 ommerclal 0 Residentisix SERVICEADDRESS W01414)t L C [TV bdl*l 8 11 P6 ZIP !�?OAO CONTACT PERSON PHONE ZIZI 776a� FAX q�s zzf LOCATION OF ASSEMBLY r) Va4f Al 114c 0r,6UAd14V DOWNSTREAM PROCESS R-tV �447'15 DCVA 13 RPBA 13 PV`BA 0 OTHER)0!!�M NEW INSTALW EXISTING 0 REPLACEMENT 0 OLD SER. 4 PROPER INSTALLATION? YES 0 NO 0 MAKE OF ASSEMBLY �7"T-MODEL00-7/lAa SERIALNO. 20), 70 SIZEkY j ' DCVA/RPBA DCVA / RFBA RPBA PVBA/SVBA INITIAL CHECKVALVENO.11 CHECKVALVENO.2 AIR fNLET TEST OPENED AT PSID OPENED AT PSID LEAKED 0 LEAKED 0 #ICHECK PSID PASSE FAILEEF-*13 D 2,q 4. Lf DID NOT OPEN 0 PSID PSID AIR CAP OK? CRECK VALVE NEW CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART HELD AT PSID PARTS LEAKED 0 AND 0 13 0 13 0 0 REPAIRS 0 0 0 0 13 0 CLEANED 11 13 13 CI 0 0 0 REPAIRED 0 0 Ll 0 0 0 0 TEST AFTER REPAIRS LEAKED 0 LEAKED 0 OPENED AT PSiD AIR INLET PSID PASSED(3 PSID PSID #1 C14ECK PSID CHK VALVE PSID FAILED LO AIR CAP INSPECTION: Required minimum air gap separation provided? Yes 13 No 13 Detector Meter Reading REMARKS: LINE PRESSURE Of PSI' CONFINED SPACE? A 0 TESTERS NAME PRINTED: Joshua PODiCh TESTERS PHONE N (425) 672-9242 TESTERS SIGNATURE: Z2 - CERT. NO. — B4477 DATE )) — I re1o'HX4Alehrfe, and I hove used WA C 246-290-490 appro ved test methods and test equipment � �i �lt CALIBRATION DATE:,07/01/2010 GAUGE#08040796 MODEL Mid- West 845 SERVICE RESTORED? YE5e NOO � .............................................................................................. ........ REPAIRED BY —NAME PRINTED: PHONE# (425) 672-9242 RE -TEST BY — SIGNATURE: CERT. NO. DATE IcerfJ& that this report is accurate, andlhave used WAC246-290-490 approvedtest methods andiest equipmew. CALIBRATION DATE: GAUGEM MODEL SERVICE RESTORED? YES 0 NO 13 YU1 I J : 2 /AM ej x0affn Mrs. IRRIGATION & LANDSCAPE LIGHTING PO Box 1293, Edmonds, WA 98020 1-800-459-7785 / Ph 425-872-9242 / Fax 425-672-4350 ANNUAL BACKFLOW PREVE kyrry^wlr A - E I ST REPORT ACCOUNT#: ASSEMBLY ID# NAME OF PREMISE 1 ­7 ommercial 0 Residential 0 SERVICE ADDRESS CITY 0.7de zip CONTACTPERSONAt7�t,_PHONE q�,Y 776' FAX"OS ;�V ?0& LOCATION OF ASS MBLY or DOWNSTREAM PROCESS DCVA 1,+r RPBA 0 PVBA Ir OTHER 694 NEW INSTALW EXISTING 13 REPLACEMENT 0 OLD SER. #—PROPER INSTALLATION? YE5�`No 13 MAKE OF ASSEMBLY k/4114 4 1 MODEL7L5'7 - ---SERIAL NO.k C _S07 SIZE r . METER # INITIAL PCVA/RPBA CHECK VALVE NO.1 DCVA/RPBA CHECK VALVE NO.2 RPBA PVBA1SVBA TEST AIR INLET I OPENED AT PSID LEAKED 0 LEAKED 0 #ICHECK PSID OPENED AT ?SID PASSE0_ FAILED 0 q.0 DID NOT OPEN 0 PSID PSID AIR GAP OK? CHECKVALVE NEW CLEAN REPLACE PART CLEAN REPLACE PART CLEAN REPLACE PART HELD AT PSID PARTS LEAKED E3 AND 13 13 0 13 13 12 REPAIRS 13 13 0 13 [3 0 CLEANED 0 0 [3 13 0 0 0 REPAMED El 13 11 13 13 13 TEST AFTER REPAIRS LEAKED El LEAKED 0 OPENED AT PSID AIR INLET PSM PASSED 0 PSID PSID NICHECK PSID CHK VALVE PSID FAILED 0 AIR GAP INSPECTION: Required minimum air gap separation provided? Yes 11 No 0 Detector Meter Reading REMARKS: LINE PRESSURE) ad- PSI --CONFINED SPACE? ko- TESTERS NAME PRINTED: Joshua Ponich TESTERS PHONE # (425) 672-9242 TESTERS SIGNATURE: CAAZI CERT. NO. B4477 DATE .,06 repoft f afeu rate, and I hae u'sed WA C 24-6-290490 appro ved test methods and test equ ipmant, — CALIBRATION DATE. 07/01/2olo GAUGE # 08040796 MODEL Mid -West 845 SERVICE RESTORED - ? iE� NO 0 ---------------------------------------------------- I --------------------------------------------------- REPAIRED BY - NAME PRINTED:' PHONE N (425) 672-9242 RE -TEST BY - SIGNATURE: CERT. NO. DATE I ceHify that this repon is accurat4 and 1have used WAC246-290-490 approved ten methods andiest _equipme"L CALIBRATION DATE: GAUGE M6DEL SERVICE RESTORED? YES 13 NO 0 FEB. 7. 2011 3: 28AM Seattle Public Utilities (206-694-3536) LIU LUCI 'L?9w W CSB - Inspection Services --- h Ldlef&gn IRRIGATION A LANDSCAPE LIGHTING 700 56Avenue, Suite 4900 PO Box 1293, Edmonds, WA 98020 PO Box 34018 1-800-459-7785 / Ph 425-672-9242 1 Fax 425-672-4350 Seattle. WA 981244018 ANNUAL BACKFLOW -PREVENTION ASSEMBLY TEST REPORT ACCOUNT4: ASSEMBLY ID# NAMEOFPREXISE Wct)1444 7 Comxnercial 11 Residenfi*4r SERVICE ADDRESS .3 1wq)n -.44 54 CITY fd/�VOc6 Zip W000 CONTACT PERSON PHONE FAX LOCATION OF ASSEMBLY po" 10-p- DOWNSTREAM PROCESS tr DCVA RPBA 0 PVBA 0 OTHER NEW INSTAILLX EXISTING 0 REPLACEMENT 0 OLD SER. # PROPER INSTALLATION? YES [I No [I MAKE OF ASSEMBLY W/41111f MODEL _9� SERIAL NO. 33-� 414� e 4/ SIZE ) �/ METER #' DCVA/RPBA DCVA/RPBA' RPBA PVBA/SVB INITIAL , CHECK VALVE NO.1 CHECK VALVE NO.Z AIR INLET TEST OPENED AT PSID OPENED AT PSID LEAKED 11 LEAKED 0 #ICHECK PSID PASSEDA� � 1 7 �, 6 DID NOT OPEN 11 FAMED 0 PSID PSID AIR GAP OK? NEW CLEAN REPLACE PART CLEAN RULACE PART CLEAN U21ACE PART CHECK VALVE HELD AT PSID PARTS 13 D 13 11 LEAKED 13 AND 13 'D 0 El 11 11 REPAIRS 11 13 D 11 0 0 CLEANED 11 11 0 11 11 11 0 REPAIRED 11 TEST AFTER REPAIRS LEAKED 0 LEAKED OPENED AT PSID ArRrNLET PSID PASSED 11 PSID PSID #1 CHECK PSID CHK VALVE PSID FAMED 13 AIR GAP INSPECTION: Required Ininimurn air gap separation provided? Yes 13 No 13 Detector Meter Reading REMARKS: LINE PRESSURE PSI CONFINED SPACE? JW TESTERS NAME PRINTED- Joshua PoRich TESTERS PHONE N (425) 672-9242 TESTERS SIGNATURE: W & . -CERT.NO. B4477 DATE /- �J-)j 7 1 caNY14 06 report is &c'u rale, and I h a ve used WA C 246-29X4 9 0 appro ved test meth ads and lot e qu ipment CALIBRATION DATE: 07/01/2010 GAUGE N 08040796 MODEL Mid -West 845 SERVICE RESTORED? YEMr NOD ------------------------------------------------------- ------------------------------------ : 4 ......... REPAIRED BY - NAME PRINTED: PHONE 0 (425) 672-9242 RE -TEST BY - SIGNATURE: CERT. NO. DATE I cerfify that fkv report Is accurate, and1have used WAC246-290-490 upprovedfest methods andW equipment CALIBRATION DATE: GAUGE N: MO'DEL ERVICi RESTORED? YES 11 NO 13 PERMIT# CITY OF EDMON,& SOIAL INSPECTION AND TESWG AGREEMENT Imm 2 7 DATE: PROJECT SITE ADDRESS:- ;316 (VICV61T :SZ*7 PROJE CT NAME: jW Job4(-A/0 -r SPECIAL INSPECTION AGENCY ARVk j5-1 Mfv-4RO 5: *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRE D: Special inspections are required for this project in accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testing/inspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO tinder the Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION RE, GARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION DATTACHED DAPPROVED PLAN SHEET • Fabrication (1704.2) o Wood Constniction (1704.6) • Steel Construcfio�11704.3) oSoils(1704.7) • Concrete (1704A) _ o Bolts installed in Concrete (1704.13) • Special Moment Resisting Concrete Frames (1704 )J Reinforcing Steel, Prestressing Steel Tendons (I 704A) • Structural Weldigg (1704.3j) o High Strangth Bolting (1704.3.3) • Masomy (1704.5) o Reinforced Gypsum Concrete (1704.4) • Structural Masonry for Seismic Resistance (1708, 1) o Structural Observation (1709) • Insulating Concrete Fill (1704.4) o Spray Applied Fire -Resistive Materials 1704, 10) Ei Piling, Drilled Piers, and Caissons (1704,8, 1704 Shotcrete (1 04.4) • Pier Foundations (1707.5) --o o Structural Steel (1707.2) • Grading, Excavation, Fill, Proof Rolling (1704.7) o Smoke -Control Systems (1704.14) • Exterior Insulation and Finish Systems (1704- 1 o Designated Seismic Systems (1707.9) • Mechanical Components (1707.8) o Cold Formed Steel FTaming_(1707.4) • Storage Racks (1707.6) o Architectural Components (1707.7) • Structural Wood (1707.3) o Special Cases (1704.13) • Seismic lsolatiou System (1707. 1.0) *S#d:AeXAt4.V (4"6e. • Mastic, Intumescent Fire Resistant Coatings (1704. tl) AldW OtAi% Me ms' Lo High Load Diaphragms (1704.6. 1) -)p - BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements, and return, to the Building Division for approval prior to permit issuance. WABu1Iding\HANDOUT ICODES\FORMS\SPECIAL INSPECTION AGREENENT FORM.doc7/07 �APPROVAL OF SPECIAL WECTORS; Each special inspectoall be approved by the Building Official prior to performing M duties or inspections. The compailnerforming inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of HIC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector L OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY RE' PORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description and date of daily inspections and tests made with applicable locations List of all non -conforming items and locations Report on status of non -conforming items (how each was resolved or unresolved) Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. W:\Dui1din9\HAND0UT ICODESTORMSNSPECIAL INSPECTION AGREEMENT FORM.doc7/07 5. FINAL CONSTRUCI&N REPORT The special inspecto]W inspection' agency shall submit alk signed report or Certificate of Compliance to th ' e City stating that, all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conforinance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifica4 addressed in this report. B. Contractor., Responsibilities 1. NOTIFY THE' SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPE CTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the.contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RE, TAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities I. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE Or OCCUPANCY The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the I'mal report have been submitted and accepted by the City. D- Owner ResDonsibilitics 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engi ieer or Architect of Record Responsibilitie 1. Prepare Matement of special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and Provide corrective action for work that may not conform, to the approved plans. WABuildingXHANDOUT ICODES\FORMS\SPECIAL INSPECTION AGREEMENT FORM.doc7/07 QM11- Z I. LVV7 I I ; VZMIVI NO. 427- P. 4, AqQqOWLEDG1&WWTS I I ham read Og,,e to CONTlY H" the terms and co,49 f thi.7 'Wemat Owuerume 'so MPPPrintorme) General Contractor f-. Special Arehitoct&ngineer of Rpcopo name / Date name lease print or type) Date print or type) Date Return the Original signed agreement to the Building Diu-si-on City Of FAM60di Building Division 1215"' Aven u�e NOrth, CiV Hall Second Floor Edmonds, WA 9802,0 ACCF'P'M;By CITY OF ]EDMONDS BUILDING DIVISION: City Official Signature "ate Title- 4-44, W-%uHd"W9UiANWUT 1CODMFORMSPECIAL INSPECMON AGREEMENT FORM.doc7/07 0 0 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN FIELD REPORT Date: September 28, 2009 Reference project: 316 WALNUT ST Reference permit#: 2008-0031 Item #1 — (2) CS 14 straps bent around the W-flange beam is acceptable to anchor the shear wall above. Install (2) #10 TEK (self tapping screws) to secure the straps to the beam lower flange. Item #2 — HSS 4 x 4 x 14' column is acceptable as the hold-down of the shear wall framing into it. Install (2) 2 x 6 boundary members and bolt onto the HSS 4 x 4 x 'A" column. Use 1h" diameter bolts Ca) 24" o.c. Item #3 — See detail 4 below for beam connector attached to W10 x 30 beam. 3.5 X 11.875 f SIMPSON (B412) B-STYLE CONNECTION TO W1 0 X 30 NO SCALE 11006 60TH AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 '0q 0 0 LuSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN FIELD REPORT Date: October 6, 2009 Reference project: 316 WALNUT STREET, EDMONDS Permit No: #20080031 kkip nprformpri ;in nn-gitp visit ;it thp ;ihnvp rPTPrpnr.pd nrniprr tn insnprt thp r.nnr.rpi-P basement walls reinforcement & thickness. We found the reinforcement size, spacing and the wall thickness meets our design intent. We approve the concrete basement walls. The concrete strength (for this project) of 2500 psi (5-1/2 sack mix) is acceptable (footings, Yyidiib, LAU). NU bpt!Lidi inbIptiLLIUris at e i equii ed. FUr Fidi SUI IdLL-S whet e 3000 Pbi LUIM tAt! IS specified, no special inspections are required. L., .3 L- S 0 COD 0 36923 L 11006 60'" AVE WEST - M U Ki LTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN FIELD REPORT Date: October 24, 2009 Reference project: 316 WALNUT STREET - EDMONDS Permit No: #20080031 We performed an on -site visit to inspect the shear walls, hold-downs and drag struts. The following were found the following items that need correction. We consider these items are minor and we do not need to re-insr)ect. Exterior sidina mav be installed concurrently with the required exterior straps (as noted below). We approve the shear wall sheathing, drag struts and hold-downs. THIRD LEVEL • Shear wall nailing was found to be acceptable and therefore approved. • All double top plates where vent pipes occur, install 16Ga x 2" wide x 24" long strap. Center strap at center line of drain pipe. • Add 16 Ga x 2" wide x 24" long per below: 11006 60TH AVE WEST - M U KI LTEO WA 98 275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN 0 Interior shear wall to truss attachment is acceptable as framed. Acceptable connection Add exterior MST48 strap to tie top plate @ all locations where steel columns interrupt the top plates and an interior strap cannot be installed. All exterior straps maybe installed concurrently with the siding. FIRST & SECOND LEVEL • At all locations where the top plates are interrupted by the steel columns, install MST48 strap in the exterior OR interior. Exterior straps maybe done concurrently with the siding. • All drag struts are acceptable (as installed). PARKING GARAGE 0 No discrepancies found. 11006 60TH AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CITY OF EDMOW AWAL MPECTION AND TE9WG AGREEMENT PERAMT# 1,60& DATE:— J4��J 2cle PROJECT SITE ADDRESS: 7-V(0 W4tAXT ST PROJECTNAME: SPE CIAL INSPECTION AGENCY_ CIfS Lg,2C67 *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testing/inspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2: FOR SPECIFIC INFORMATION RE, GARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION DATTACHED OAPPROVED PLAN SHEET o Fabrication (1704.2) o Wood Constniction (1704.6) )(Steel Construction (1704.3) o Soils (170 .7) AConcrete (1704-4) o Bolts installed in Concrete (1704.13) o Special Moment Resisting Concrete Frames (1704.4) XStructural WeMng (1704.3.1) o Reinforcinr, Steel, Prestressing Steel Tendons (1704.4) Strength Bolting (1704.3.3) • Masoruy (1704.D _XHigh o Reinforced Gypsum Concrete (1704.4) • Structural Masonry for Seismic Resistanc (1708.1) o Structural Observation (1709) • Insulating Concrete Fill (1704.4) o_ Spray Applied Fire-Resisfive Materials (1704. 10) • Piling, Drilled Piers, and Caissons (1704.8, 1704 o Shotcrete (1704.4) • Pier Foundations (1707.5) �Otructural Steel (1707.2) • Grading, Excavation, Fill, Proof Rolling (1704.7) o Smoke -Control Systems (1704.14) • Exterior Insulation and Finish Systems (1704- 12) o Designated Seismic Systems (1707.9) • Mechanical Components (1707.8) 0 Cold Formed Steel FTaming (1707.4) • Storage Racks (1707.6) o Architectural Components (1707.7) • Structural Wood (1707.3) o Special Cases (1704.13) • Seismic Isolation System (1707. 10) 0 • Mastic, Intumescent Fire Resistant Coatings (1704. 11) 0 • High Load Diaphragms ( 1704.6. 1) BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector SIM complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval prior to permit issuance. W:�Building\HANDOUT ICODESXFORMS\SPECIAL INSPECTION AGREEMENT FORM-doc7/07 'APPROVAL OF SPECIAL ECTORS: Each special inspectooll be approved by The Building Official prior to performing vavy duties or inspections. The compan-T performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector I. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections arc to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY RE, PORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: Description and date of daily inspections and tests made with applicable locations List of all non -conforming items and locations Report on status of non -conforming items (how each was resolved or unresolved) Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. W:\Building�HANDOUT ICODES\FORMSNSPECIAL rNSPECTION AGREEMENT FORM.doc7/07 5. FINAL CONSTRUCW REPORT The special inspectoMW inspection agency shall submit alk signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPE CTOR OF ALL REQUIRED SPECIAL INSPE MONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RE' TAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPE CTION - The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE, WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Official may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D- Owner Responsibilities 1- The p, 'ect owner or the engineer or architect of record acting as the owner's agent shall fund roi special inspection services. E. KI n2ineer oriArchitect of Record ReWonsibilities 1. PrepareStatement of Special inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform � to the approved plans. WABuilding\14ANDOUT ICODES\FORMS\SPECIAL INSPECTION AGREEMENT FORM-doc7/07 JAN. 2 1. 2009 - 10: � 1AM Owner name NO. 426 ACKIqOWLEDGEMENU 10 I kne read and agree to comply widi the &= and condidow of jkjs agrument. P. General COI'tmctOrCompany/Ownernme—kV/t,;Ag/, /4-cn 'P"MW "e sigeflhireA4Y-,e—��. Date SPedal InspectortAgency name AnflitOctffingWeer of Rpcoro name (pleme print or type) print or type) 0 W VA-Cv- Return Ote original signed agreement to the Building Division CifY of Ulmonds Building Division 121 5"� AV, enue No rth, City Han Second Floor rsdmonds,' WA 98020 ACICTMD BY ciTy OF city ofmaisinature It 10 S BUILDING DIVISION: . 4 - Date Z2 Date W' '�Buifdir-e"ANDOUT 'CODESWORMSSPECAL INSPEC71ON AGREEMENT FORM.4ac7/07 a CASCADE TESTIM- , LABORATORY, INC. TESTING & INSPECTION PREVIOUS 3'.% 9 9 0 0 12919 N.E. 126TH PLACE REPORT No. No. KIRKLAND, WASHINGTON 98034 (425) 823-9800 EVERETT (425) 259-0817 DATE CERT.,N\O.,,_ FIELD REP ORT PROJECT ��) �' \ (C LOCATION TO: 0*7 Q- A- sk. BLDG. PERMIT No. OWNER e 2 00 1 A Alca WEATHER TEMP. AM PM ENGINEER i A o" ARCHITECT ATTN: CONTRACTQJ)� (2) (3) INSPECTION PERFORMED L� RAL WOOD ITEMS INSPECTED FOUNDATIONS RESTEEL/CONCRETE S 'L ONLY FOOTINGS SLAB VRES T RESTEEL/MASONRY TR.STAMELDING AUGER CAST PILES COLUMNS ZE STR.STIBOLTING DRILLED PIERS — WALLS BEAMS HER — (4) LOCATION (AREAS) tyz IV AQV -S 2,1 (5) CONCRETEIMASONRY MIX NO. DESIGN STRENGTH (f'c) SUPPLIER TOTAL CU. YD. PLACED SLUMP (INCHES) SPECIMENS.CAST AIR CONTENT CYLINDER REPORT NO. ITEMS INSPE CTED WERE IN CONFORMANCE WITH BLDG. DEPT. APPROVED PLANS YES NO REMARKS: N CA i Q c\-, �A Q� v-- 0 C\< \)c C�' cl\e -921A j 'ro \/v & okfal'� kr-'--� TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED. THIS REPORT SHALL NOT INSPECTOR(S), NAME(S) BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY. INC. INSPECTOR SIGNATURE REVISED 3109 COPIES TO: SIGNED BY a a CASCADE TESTIpmG LABORATORY, INC. TESTING & INSPECTION PREVIOUS :136990 12919 N.E. 126TH PLACE REPORT No. No. KIRKLAND, WASHINGTON 90034 (425) 823-9800 EVERETT (425) 259-0817 DATE vo CERT.440 C) /—I --;o FIELD REPORT PROJECI LOCATION 2, " 6 0 Itz Ag; TO: BLDG. PERMIT NO. OWNER 20ps 00 1, k WEATHER TEMP. AM PM C[902L= ENGINEER ARCHITECT ATTN: —CO—NTRACTM (2) (3) INSPECTION PERFORMED LATERAL WOOD ITEMS INSPECTED — FOUNDATIONS RESTEELICONCRETE ONLY FOOTINGS — SLAB .;R?E.1�1511_ T � RESTEEUMASONRY STR.ST/WELDING 'T' — AUGER CAST PILES — COLUMNS ST R.ST/BOLTING — DRILLED PIERS — WALLS V OTHER — BEAMS (4) CLIO_ C!,, LOCATION (AREAS) V62 S 2,,l (5) CONCRETE/MASONRY MIX NO. DESIGN STRENGTH (f'c) SUPPLIER TOTAL CU. YD. PLACED SLUMP (INCHES) SPECIMENS CAST AIR CONTENT (%) CYLIN�7REPORT NO. ITEMS INSPECTED WERE IN CONFORMANCE WITH BLDG. DEPTAPPROVED PLANS YES E2"000' NO [:1 REMARKS: -rl (_\� -e & OM�IiZ C\< 0 TEST RESULTS APPLY ONLY TO THEITEMS I HEREIN TESTED. THIS REPORT SHALL NOT INSPECTOR(S), NAME(S) PRI BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY, INC. I INSPECTOR SIGNATURE F21Z NOV - 4 2069 DEVELOPMENT SERVIUES CT, Cin, nF FMIONDS V�zo %--�) REVISED 3/09 1 SIGNED BY COPIESTO: M .0 elqokr OCT.29.2009 8:29AM As a NU, /I If r. i CASCADE TEST7.Wi LABORATORY, INC"' TESTING & INSPECTION PREVIOUS 12919 N.E. 126TH PLACE KIRKLAND. WASHINGTON 99034 (425) 823-9800 EVERETT (425) 259-0617 REPORT No. No.136990 DATE CERT. /?, v4Z ko FIELD REPORT PROJECT (o LOCATION �Wa TO. BLDG. PERMIT NO. OWNER Zoo c Olt S WEATHER TEMP. AM PM LIRV 9W2_1.::> ENGINEER ARCHITECT ATTN: REGE! D 2009 CONTRACTOJ%N�, CV,\� (2) INSPECTION PERFORMED 7_��ERALWOOJWILDING DEPARTMENT C4TY OF EDMONDS ITEMS INSPECTED — FOUNDATIONS RESTEEIJCONCRETE S 'L ONLY — FOOTINGS — SLAB VRES T RESTEEUMASONRY TR.STAWELDING — AUGER CAST PILES — COLUMNS STR.STfBOLTING low,\ :121R — DRILLED PIERS — WALLS BEAMS (4) LOCATION (AREAS) Ak. 4 \<./k2 ake_v S2.1 _C\CC 26NCRET&MIASONRY MIX NO. DESIGN STRENGTH (I-C) SUPPLIER TOTAL CU. YD. PLACED SLUMP (INCHES) SPECIMENSCAST AIR CONTENT(%). CYLINDERREPORT NO. ITEMS INSPECTED WERE IN CONFORMANCE WITH BLDG. DEPT. APPROVED PLANS YES NO n REMARKS: V" QAiQ �- o< CVvo \/v & TEST RESULTS APPLY ONLY TO T=S I HEREIN TESTED. THIS REPORT S OT INSPECTOR(S), NAME(S) BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY, INC. I INSPECTOR SIGNATURE 0 %Z) REVISED 3(09 COPIES TO: SIGNED By ASCADE TESTINIOX,130RATORY, INC. TESTIN & INSPECTION 12919 N.E. 126TH PLACE KIRKLAND, WASHINGTON 98034 (425) 823-9800 EVERETT (425) 259-0817 FIELD REP 0., R T m � cv-e� ( 0 k. CV -I C, ell z Q- A- skz) AZA VVA� k-> V%, � s kTTN: (2) 'INSPECTION PERFORMED LATERAL WOOD RESTEEUCONCRETE _4TE �L ONLY S RESTEEUMASONRY R.STIWELDING / Ep STR.ST/BOLTING -e TH E R (4) or CN, LOCATION (AREAS) (e7 A00 -f-s- (5) CONCRETEIMASONRY MIX NO. SUPPLIER SLUMP (INCHES) AIR CONTENT PREVIOUS REPORT No. No. 13'6990 DATE CERT. 0 hl�.ej PROJECT LOCATION BLDG. PERMIT NO. OWNER 9nnlz co k I WEATHER TEMP. @ AM I I I Pm ENGINEER M Oka (3) ITEMS INSPECTED FOOTINGS AUGER CAST PILES DRILLED PIERS ,ex c-p 0<1 DESIGN STRENGTH (f'c) TOTAL CU. YD. PLACED SPECIMENS CAST_ CYLINDERREPORT NO. ITEMS INSPECTED WERE IN CONFORMANCE WITH BLDG DEPT. APPROVED PLANS YES E]/' NO 0 \ I-O'd Nrl ( It D x CA Q c\4 \Q�V-- 0( REMARKS: k / , x � -j cl< w I '(0 \/-q TEST RESULTS APPLY ONLY TO THE ITEMS HEREIN TESTED. THIS REPORT SHALL NOT INSPECTOR(S), NAME(S) PRI BE REPRODUCED EXCEPT IN FULL, WITH- OUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY. INC. INSPECTOR SIGNATURE 'REVISED 3109 SIGNED BY FOUNDATIONS SLAB - COLUMNS WALLS BEAMS PA COPIES TO: DEC. 2,2008 4:47PM NO. 401 E'040 11 4-t-ol So ary OF EDIVM8 ACIAL 1NS*P'ECT'1ON AND TESM AGRE EW NT PERMIT 4 BUILDING DEPARTMENT C DATE:102/0,0i - FROJE CT SITE ADDRESS; al�� a&Az ST. PROJECT NAME: �S& 141&,Ak)T c-r SPECIAL INSPECTION AGENCY T)EV*WS' W 5-0)0: R-9f, *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPE CTIONS REQUIRED: Special inspections am required for this project In accordance with IBC Chapter 17 or in accordance with IRC R109.2 as applicable. IBC Section 1704.1 requires the owner or the registered design professional in charge to employ an independent testingfinspection agency/special inspector to perform required special inspections. The independent agency hired to perform the duties of special inspection is required to be a registered agency with WABO under the Special Inspection Registmfion Program (SIRP). The special inspector shall be a qualified person with competence for inspection of the particular type of construction or operation requiring special inspection (SOQ may be required by the Building Official). The owner, registered professional, contractor and special inspector/agency shall complete the attached form and submit directly to the Building Division. WORK REQURING SPECIAL INSPECTION. Special inspections will be required for the following categories of work in accordance with IBC Chapter 17 and IRC R109.2-. FOR SPECIFIC INFORMATION RE, GARDING REQUIRE D SPECIAL INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION OATTACHED DAPPROVE D PLAN SHEET * Fabrication (1704.�) c3 Woo Consiniction (1704-6) * Steel CoD3truction ( 1704.3) oib (170 7) -- * Concrete (1704A) oBolts installed in Concrete (1704.13) -0 S ecial Moment Resisting Concrete Frmnes (1704.4) o Rcinforcing Steel, Pmtressing Steel Tendons (1704.4) • Structural WeMng (1704-3.1) oHighS ength Bolting (1704.3.3) • Masonry (1704.5) u Reinfomed Gypsum Concrele (1704.4) -- • Structural Masonry for Seismic Rwistance (1708. 1) a Structural Observation (1709) • Insulating Canci-ete Fill (1704.4) c3 SpM Applied Fire-Resisfive MateriaJs (1704. 10) Piling, Drilled Piepy, ajid Caissons (1704.8, 1704.9) o Shotcrete (1704.4) -a a Pier Foundations (1_707.5) 13 Structuml Steel (I 707.?J— )KGrading, Excavation, fill, Proof Rellhig (17043) a Smok&C21��l S)jjern� Q 704-14) Exterior Insulalion and Finish Systems (1704-12) o Designated Seismic Syslems (1707.9) —c3 J3 Mechanical Components (1707-8) o Cold Formed Steel Ftaming (1707.4) D Storage Rocks Q 707.6) ct Architectural Components (1707.7) -a Snucmml Wood (17073) Seismic Isolation System (1707. 10) o Special Cases (1704.13) n nmA ---- fwy IF— -a o Mastic, Intumesceiii Fire Resistant Coatings (1704. 11) qffighloadDisp gms(1704.6.1) 10al" 6wra L BEFORE A PERMIT CAN BE ISSUEI)-. The owner and contractor and special inspector shall complete this agreement and the attached Special Inspection Information Form, including the required acknowledgements and return to the Building Division for approval pjior to permit issuancc. WABuildingWANDOUT ICODESWORMS\SPECIAL INSPECTION AGREEMENT FORM.doc7/07 DEC. 2,2008 4:48PM NO.401 P. 3 APPROVAL OF SPECIAL &U, CTORS., * 'rAch,,1pcciaJ inspector 4 be approved by The Building Officistl prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special lnsPcctOr 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisions of the IBC- Architect or Engineer reviewed shop drawings may be used only as an aid to inspection. Special inspections are to be performed on a continuous basis —meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in die approved project plans in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections way be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifientions, and approved by the Building Official. 2. RE PORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely mainier shnil be immediate cause of the special inspector to notify tile Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly uotif� the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inWetions. The dailY reports shall remiin at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following: • Description and date of dmly inspections and tests made with applicable locations • List of all non -conforming items and locations • Report on status of non-conformitig items (how each was resolved or unresolved) • Field changes authorized by the Architect, Engineer or City Inspector if Dot included in non-conformance items. W.\BuildingWANDOUT ICODESTORMS\SPECIAL INSPECTION AGREEMENT FORM,doc7/01 DEC. 2,2008 4:48PM NO-401 P. 4 5. FINAL CONSTRU* REPORT ­ The special inspector or inspection agency shall submit arm4psigned report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And$ to the best of his/ber knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Itenis not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed iuspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE'SPECIAL INSPECTOR OF ALL REQUIRE D SPECIAL INSPE, CTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specirwations are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the jobsite. 3. RE, TAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division ResponAbilities 1. APPROVE, SPECIAL INSPECTION The Budding Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEIKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Official way issue a Certificate of Occupancy after all wmwy special inspection reports including the fmal report have been submitted and accepted by the City. D. Owner Resoonsibilities 1. The project owner or the engineer or arehitect of record acting as the owner's agent shall fund special inspection services. E. Eng�ncer or Architect of Record Responsibilities I. ftepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not conform to the approved plans. W:\BtdIding\)MNDOUT ICODES\FORMS\SPECIAL INSPECTION AGREEMENT FORM.docl[07 NO, 401 p. �P- 5 DEC. 2. 2008 NO, al. I- Me IV: I-LIJ15 AGMVLXDGVAM am mwdwa to Como w1h at &mod couuwwl% qmmt 4 P1111t or W" 0# . 0 Date ."I.- � tvl�. amome tt V ICA ak A 99 -&W - 6da (pkrm PTki #r type) �-er- — Date - &Of* -r46- q U 10 AnUhttlWour or qpot 1 Lz- 41 lUiwm *o oyWW dlxtd %memut ts As SAWke Dlvkbo avelldwah Bombs Mbin 121 Ob Avaus Nork City Vog Somd VWr 'Edmm* Wit 9M ACCVM BY CM Of RDNOWN BUUA14C C* omad fflpldvr�-- cu�//,/y a�� 21(o %4PjUU1T.Sr. #Ajcoe%- CDOAT. 43-c" 42601toe)31 /! zf4 t N WMIMANAMMT IC=WMMWWAL RWWM AGRUMW FORMAN70 M 08-03 RECEIVED Dennis M. Bruce, P.E. JAN 1.8 2008 BUILDING DEPARTIAENT M.S.C.E., M.B.A. Geotechnical /Civil Engineer January 15, 2008 'PV City of Edmonds MR�ROFILM'm* CITY COJL A c/o Michel Construction 7907 212t' St. SW, # 102 Edmonds, WA 98026 Subject: Geotechnicall Evaluation — Foundation i Shoring Recommendations Proposed 7-Unit Building 316 Walnut St., Edmonds, Washington This engineering report presents the results of a geotechnical evaluation of the Michel Construction property at 316 Walnut St., Edmonds, Washington. This evaluation was required by City of Edmonds Building Department. REFERENCES: • Project Plans by McGrew Michel Building Design da :e • Site photographs L BACKGROUND: The overall property at 316 Walnut St., Edmonds, W shi shape (approximately 130 feet by 110 feet). See plans. The 'overall site is gently sl I oped with no significant geotechnical features. The existing building, driveways, concrete fences, etc. are to be removed in conjunction with the proposed development for a 3-story building (with underground garage) as indicated on the site plan. Visual evaluation of the overall property reveals no evidence of any geotechnical distress: no slides, no soil tension cracks or any evidence of erosion al degradation. EVALUATION: In order to augment the existing site geotechnical information, 4 si were hand dug by this engineer on December 19,2007. All 4 test holes similar sub -grade conditions, namely: MIN, 2 1i 2" L ;� i EECE SOILS * FOUNDATIONS, * SITE DEVELOPMENT * INSPECTION a DRAINAGE e DESIGN & PERMIT * LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Pity of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 2 0" to 6" 6" to 38" (bottom of test holes) Organics, roots, and organic silt Dense native sands No groundwater was encountered in any of the 4 test holes. All test hole walls remained vertical and stable. No sloughing or caving occurred. NOTE: This engineer has performed many soil investigations and follow-up inspections in the vicinity of this site and verifies dense, native, sub -grade soils allowing for normal / standard reinforced concrete footings'. CONCLUSIONS I RECOMMENDATIONS: Based on the findings of this investigation, and experience with similar sites in the area, the Michel property at 316 Walnut St., Edmonds, Washington is -geotechnically approved for the proposed 7-unit building,, subject to the following: Temporary shoring: The proposed excavation cuts of up to 9 feet may be'open cut" within the property if the soil cuts are sloped at 1: 1 (temporary declination) This engineer's experience recommends temporary Eco-Block shoring to allow for a "cleaner" excavation and foundation zone during construction (see attached temporary Eco-Block shoring design). • Standard rced co inuous and spread footings. Allowable bearin I pressur; 3, . 000 ps.f. • Equivalent fluid pressure of 35 p.c-f. is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. For retaining wall design, use fricfion factor of 0.55 and passive pressure of 350 p.c.f. Geotechnical inspections by this engineer prior to any foundation concrete placement. The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have minimum widths of eighteen (18) and twenty-four,(24) inches, respectively, and sh be bottomed at least eighteen (18) inches below the lower adjacent finish ground surface. Pity of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 3 Depending on the final site grades, some over -excavation may be required below footings to expose* competent native soils. Unless lean concrete is used to fill the over excavate * d hole, the width of the over -excavation at the bottom must be at least as wide as the sum of two times the depth of the over -excavation and the footing width. For example, an over -excavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Footings constructed according.to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (P.S.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: Paramete Coefficient of Friction Passive Earth Pressure Where: Design Value 0.55 350 p.c.f. (1) P.C.f. is pounds per cubic foot. (2) Passive earth pressure is computed using the equivalent fluid density. We recommend that a safety factor of at least 1.5 be used for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE: Slab -on -grade floors may be supported on undisturbed, competent native soils or on structural fill. The slabs may be supported on the existing soils provided these soils can be re -compacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We City of Edmonds clo Michel Construction, Inc. January 15, 2008 Page 4 also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following recommended design parameters are for walls less than twelve (12) feet in height, which restrain level backfill: Parameter Desi-qn Value Active Earth Pressure* 35 p.c.f. Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. Where: (1) P.O. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which cannot deflect at least 0.002 times the wall height, a uniform lateral pressure of one hundred,(100 p.s.f. should be added to the active equivalent fluid pressure). The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the -additional lateral pressures resulting from the equipment. Placement City of Edmonds 0 0 C/o Michel Construction, Inc. January 15, 2008 Page 5 and compaction of retaining wall ba.ckfill should be accomplished with hand -operated equipment. Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. The purpose of these backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Structural Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. EXCAVATION AND SLOPES: As stated, the excavation for the garage level may be undertaken at a 1:1 temporary cut. Experience recommends that temporary Eco-Block shoring be utilized to minimize excavated material and result in a "clean" foundation zone during construction (see attached Eco-Block shoring design). In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a - height greater than four (4) feet' , the cut should have an inclination no steeper than 1: 1 (Horizontal:Verfical) from the top of the slope to the bottom of the excavation. Under specific recommendations by the geotechnical* engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 2H, IV. It is important to note that sands do cave suddenly, and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. City of Edmonds 0 1 9 c/o Michel Construction, Inc. January 15, 2008 Page 6 DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch -minus washed rock wrapped in non -woven geotextile filter fabric, (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. No groundwater was observed in any of the 4 test holes during the fieldwork. Seepage into the planned excavation is possible, and likely if excavation occurs during winter months, -and if encountered should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation of the site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. GENERAL EARTHWORK AND STRUCTURAL FILL: The proposed building and pavement areas should be stripped and cleared of all Surface vegetation, all organic matter, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and after excavation prior to placement of any structural fill. I . All structural fill should be placed in horizontal lifts with a moisture content at or near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils - is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the City of Edmonds 0, c/o Michel Construction, Inc. January 15, 2008 Page 7 lifts exceed twelve (12) inches in loose thickness., The following table presents recommended relative compaction for structural fill: Location of Fill Placement Beneath footings, slabs or walkways Behind retaining walls Beneath pavements Minimum Relative Compaction 95% 90% 95% for upper 12 inches of Sub -grade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the max imum dry density, as determined in accordance with ASTM Test Designation D-1557-78 (Modified Proctor). Use of On -Site Solis If grading activities take place during wet weather, or when the sandy, on -site soils are very wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally sandy and thus are not highly moisture sensitive. Grading operations will be difficult when the moisture content of these soils greatly exceeds the optimum moisture content. a Moisture sensitive soils will also be susceptible to excessive softening and pumping" from construction equipment traffic when the moisture content is greater than the optimum moisture content. Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5). percent silt or clay particles. The percentage of.particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic materials are segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: No drainage problems were evident with the existing building and overall property at 316 Walnut St. It is understood that the new 7-unit building will comply with City of Edmonds clo Michel Construction, Inc. January 15, 2008 Page 8 City of Edmonds requirements for gutters, downspouts and storm water control tight lines into the existing City of Edmonds storm water system. CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-U2 sacks per cubic yard of concrete mix. TEMPORARY ECO-BILOCK SHORING: As previously mentioned, - it is a contractor choice to open cut the excavation at no steeper than 1: 1 declination. However, practical experience strongly recommends the use of temporary Eco- Block shoring to minimize removal of excavated material and result in a "clean" foundation zone during construction (see attached Eco-Block shoring design). INSPECTIONS: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: 0 Soil cuts • Foundation sub -grade verification • Temporary Eco-Block shoring, if required • Any retaining wall, or rockery placement • Any fill placement • Subsurface drainage installation • Temporary and permanent erosion control measures SUMMARY: The proposed Michel Construction 7-unit building at 316 Walnut St., Edmonds, Washington is geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspections during construction. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results City of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 9 of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are anyquestons, do not hesitate to call. a iowz 'A DMB:abj 100. Dennis M. Bruce, P.E. Geotechnical I Civil Engineer -459 WALNUT STREET MMNO "FWCE BENCHMARK '1013EKEMOVED .-W w W TOP 56M W. 5410 02-N) E)affnNo 4v mHe N SID SIDEWALK SX; ;_W .... 166.4o'N 89 "E _>1 I TOW2" Da w 00. 10 C 0 BLACKFLOW ge IV SE PKEVERMK EM11 h. ............... `7 W/ or.An up mp. 50-90 IE Q4a) 3f H CONP. C5_3 WALL REJOVED PBA ------ 17 ------- --- --- --------- 53 EX6nt* i4MArLe--\,A IE(53'... -IN I TO MERE] 5 N21 pra Egy OFE xv Do \_+l-VHIGHCONC. TO E E F EMOVED WALL & V RAIL FENCE 3co 0 DF VEWAY— mk_ RE40 IV- ---------- . ........... .... . . . .. .... 5P wol r To BE OVEDD PROPOS 7 1 TNHT BLM, VL GARAGE 6LA& DRIVEWAY FRON CENTER - 5LS(' WK - 5LW loo, ............. SPREADER 10.0a A............................ ......... 81 1, 1 E)OM* HOUBE Ld _ rl 10 OE MdO/ED VA� CONC. WALL TO 13E REMOVED maz LTor.saw ID BE KEL40VED 600affm[Nm5p'%wVeMffr voorw 10. alEm OF FARM D. TO 9 TOE,04A& mm,64.W 3P 13? FAIL FJJNC 03MW, W ME W _.—W w W W W > W W W 30.0a W I 'HE10fiTCA A 62--U 11 642Z C 65�5z Q 60-76 /4 . 63ZO . AVE GRADE MAX HEIGHT: SZ25? BASEMENT. 51ha IST FLOOR. GO�W 2ND FLOOR- 70-96 3RD FLOOR: &IDV E)UsFnNGGKADE PROPOSED GRADE PAKrJNG REQUATMEUM I IBM - I.5)Z . 1.5 (1) 2 BED - IhXi . Ih (5) 3 BED = 2)5. 10 TOTAL RM = 14 SPOT5 ACTUAL . 14 SPOTS 6417516A4296.02 = 457.. LOT SLOPE-. 77.E-W Immomous BUILDING (+ EAVES): 6-475.08 Sa Fr. DRIVEWAY. 675jO2 Sa Fr. PATIO: 171.77 Sa Fr TOTAL: 6,021.57 Sa Fr. M. PARCEL A:2703-230-04t-4400 PARCEL 6- 2705-230-0413800 PARCEL C� 2703-230-044-4900 OTTE BENCHMAM- TOP OF EXSTING CATCH BASIN ON THE NW PROPEKY COMER OF FARCEL A ELEVATION: 563& "R'IN MUELLER ON FIRE HYDRANT LOCATED ATTHE INTERSECTION OF WALNUT ST. & 3KP AVE 5 ON THE NE COMER. ELEVATION: 50.77 GRADE PIANE AVERAGE PER IBC 502 la6l.9v Q964-35- 066.05, aw.05! /4 = 63.0 . AVE GRADE T5Z A U 9611 VA V410A A z 0 ­4 z C-4 Lu Lu < u z (D z ul u z 0 x Z Jan 25 09 05:59p D. Bruce, P.E. 206-546-8442 P.1 Dennis M. Bruce, P.E. TAIj A31 goo(? M.S.C.E., M.B.A. Geotechnical /Civil Engineer E)s m 0 p W AL 0 0_1 7-- C) 0 Z C) tA C;4 Cops 4 cc 0 S, .� '�. 7 '� 6i5ro-rEre_4fAj . ((mL, IL nkowlss At*-p&tcvF-& PcA-,;vs 66:0T&eW, R"p-po&-r 9,0 6, 8k c) esc, E7. sc-re:- IMpro-T E, -rV6Trm(5 6r4,4j 190-kPokAmt (0A36'D(#j6) 'bAj 51-rr (NgpErC-r(C1'#j.0 rols L15-Ai6k. 4 OY jF)ceA\WT10�0 ecirre-A (86�Low �j 'L� -B LLI W6 6 to Uj if,g _t)& INSPECT CUT- b �;-c L(W got -r ree)- BLOCK Sgop_(N6 .0ij e-pofoitz. .p,lj T-. INSPE Atilb 4�vre- (0,0 Lj.�J�4 I " _b 7r to t5 0_Ft,,D6t4 I Amb -T'Lml- T E�A 5 E- A T ---I " -Jrr - Tos sk-rIE7 LAU-'-? L rot t'o Uj 0 P LEASr SOILS * FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN PERMIT 0 LEGAL MVED P.O. Box 55502 - Shoreline, WA 9B155 - (206) 546-9217 - FAX (206) 546-8442 REC-- -JAN 27 2009 DMWPMEW SENCES CTF Cffy OF EDMONDS 0 0 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical / GMI Engineer January 30, 2009 City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Subject: Field Reports/ Geotechnical Inspections 316 Walnut St., Edmonds, Washington Michel Construction Multi -Unit Building City of Edmonds Permit No. 2008-0031 RECEIVED 2009 ENGINEERING DIASION This engineering report presents the results of ongoing geotechnical inspections for the multi -unit building at 316 Walnut Street. These inspections were required by the City of Edmonds Special Inspection Agreement dated December 2, 2008. REFERENCES: • Geotechnical Report by D. Bruce, P.E., dated January 15, 2008 • July 8, 2008 Soil Cut Temporary Shoring Plan by D. Bruce, P.E. • City of Edmonds Inspection Authorization Agreement • Site photographs INSPECTIONS: This engineer performs daily inspections during excavation, shoring installation, and grading operations. 1. Excavation: Excavation encountered silty sandy soils for approximately three feet (3) of depth. Below this nominal three-foot level, extremely dense glacially consolidated "till" soils were encountered. Project excavator measured and planned on installing temporary eco-block shoring in accordance with the July 8, 2008 plan. All cuts were geotechnically stable. SOILS * FOUNDATIONS * SITE DEVELOPMENT * INSPECTION * DRAINAGE * DESIGN & PERMIT * LEGAL P.O. Box 55502 * Shoreline, Washington 98155 * (206) 546-9217 * FAX (206) 546-8442 0. 0 City of Edmonds Re: Michel Construction, Inc., 316 Walnut January 30, 2009 Page 2 This engineer made an on -site recommendation to "trim" the upper three to four feet (3'- 4') by "back grading" to a 1:1 slope. (This back grading greatly reduces any possibility of erosional sloughing). Additionally, this engineer recommended specific locations (similar to the original locations in the July 8, 2008 plan) regarding extent of eco-block shoring. Further,. based on the extreme density of the native soils, this engineer recommended that the excavation be re -measured in order to avoid any over - excavation. (it makes no geotechnical sense to over -excavate "rock hard" soil and replace with eco-blocks). 2. Tempora[y Shoring: On -site inspections verified proper placement of temporary eco-block shoring along the majority of the south excavation zone, and approximately one-third (1 /3) of the east excavation zone. See photographs. This engineer verified that all base blocks were properly embedded in compacted crushed rock. Subsequent eco-blocks were properly linked and battered. All temporary eco-blocks are approved, as placed. 3. Soil Bearing: The extremely dense native soils easily provide a minimum of 4,000 p.s.f. bearing capacity. OK to proceed with foundation formwork, reinforcing steel and concrete in accordance with City of Edmonds approved plans. NOTE: The dense glacial till provides superb bearing capacity, however, is highly subject to "mushiness" during seasonal rains. Contractor may choose to lay crushed rock to avoid cleaning out formwork at a later date, prior to concrete placement. This is merely a construction expediency suggestion. 4. Subsurface Drainacie Installation: Not yet installed. 5. Erosion Control: Contractor has established a proper rocked construction entrance off the rear alleyway. All work is confined within property lines and all exposed soil cuts have been properly protected with plastic tarps. See photographs. All temporary erosion control measures are approved through this date (January 30, 2009). 0 0 City of Edmonds Re: Michel Construction, Inc., 316 Walnut January 30, 2009 Page 3 SUMMARY: Ongoing geotechnical inspections have verified the overall stability of the excavation, proper placement of temporary eco-block shoring, and proper stability and erosion control measures installed. 0 Geotechnical inspections are ongoing. If there are any questions, do not hesitate to call. C " M. WAS 4 17405 N Dennis M. Bruce, P.E. Geotechnical /Civil Engineer DMB:vIb cc: Michel Construction, Inc. -77 S, 00 'AJJW�� VOW :. 1) f-a 9t Of "RPM i�4i Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical / Civil Engineff March 6, 2009 City of Edmonds 121 Fifth Avenue North . . F'P M Edmonds, WA 98020 Subject: Field Reports/ Geotechnical Inspections 316 Walnut St., Edmonds, Washington Michel Construction Multi -Unit Building City of Edmonds Permit No. 2008-0031 RE:CE:1Ve0 MAR 12 20og DEVE,IORABIT C,TY 0i: ESDERVICES CTR. &03 This engineering report presents the results of ongoing geotechnical inspections for the multi -unit building at 316 Walnut Street. These inspections were required by the City of Edmonds Special Inspection Agreement dated December 2, 2008. REFERENCES: • Geotechnical Report by D. Bruce, P.E., dated January 15, 2008 • July 8, 2008 Soil Cut Temporary Shoring Plan by D. Bruce, P.E. • City of Edmonds Inspection Authorization Agreement • Previous inspection reports and photographs INSPECTIONS: This engineer continues to perform on -site inspections as required by the City of Edmonds Testing Agreement regarding geotechnical aspects. 1. Excavation: As previously discussed, the excavated soils are extremely dense and stable. The majority of the excavation did not require temporary shoring. The southeast corner did require temporary eco-blocks. See photographs. Contractor has properly protected all excavation cuts with very effective plastic tarp covering. The entire excavation is stable through this date (March 6, 2009). 2. Temporary Shoring: This engineer has verified placement of the temporary eco- block shoring for the majority of the south property line excavation, and a portion of the east property line excavation. See project plans and photographs. SOILS * FOUNDATIONS * SITE DEVELOPMENT * INSPECTION * DRAINAGE * DESIGN & PERMIT * LEGAL P.O. Box 55502 * Shoreline, Washington 98155 * (206) 546-9217 * FAX (206) 546-8442 0 .0 City of Edmonds Re: Michel Construction, Inc., 316 Walnut March 6, 2009 Page 2 All temporary eco-block shoring continues to perform properly, with no evidence of any geotechnical distress. No bulging, no slippage, nor any evidence of movement. All temporary shoring is approved, through this date, March 6, 2009. 3. Soil Bearing: This engineer previously verified extremely dense native subgrade soils providing a minimum of 4,000 p.s.f. bearing capacity. Subsequent geotechnical inspections verified proper placement of formwork, reinforcing steel and concrete foundations. All concrete foundations and stem walls are geotechnically approved. 4. Subsurface Drainage Installation: Not yet installed. 5. Erosion Control: Contractor continues to properly maintain the temporary erosion control measures: rocked alleyway construction entrance, perimeter siltation fencing, and plastic tarp protection of all exposed earth surfaces (excavated zones). There have been no adverse erosion control problems to date (March 6, 2009). Inspections ongoing. SUMMARY: Continuing geotechnical inspections have verified stability of all excavations, temporary eco-block shoring performance, proper placement of foundation footings and stem walls, and temporary erosion control measures that are well maintained. 0 Geotechnical inspections are ongoing. If there are any questions, do not hesitate to call. a"'� A 4 -N�� I P n r% r%; K A 0 D C: %I- Q . I U%Wquo' . . Geotechnical /Civil Engineer DMB:vIb cc: Michel Construction, Inc. IN jzl "Pw WR kN fit Am. 0 0 M.S.C.E., M.B.A. Dennis M. Bruce, P.E. June 1, 2009 City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Subject: Field Reports/ Geotechnical Inspections 316 Walnut St., Edmonds, Washington Michel Construction Multi -Unit Building City of Edmonds Permit -No. 2008-0031 Geotechnical /Civil Engineer cou 6 0 NRf This engineering report presents the results of ongoing geotechnical inspections for the multi -unit building at 316 Walnut Street. These inspections were required by the City of Edmonds Special Inspection Agreement dated December 2, 2008. REFERENCES: • Geotechnical Report by D. Bruce, P.E., dated January 15, 2008 • July 8, 2008 Soil Cut Temporary Shoring Plan by D. Bruce, P.E. • City of Edmonds Inspection Authorization Agreement • Previous inspection reports and photographs INSPECTIONS: This engineer continues to perform on -site inspections as required by the City of Edmonds Testing Agreement regarding geotechnical aspects. 1. Excavation: All excavation has remained stable throughout the project. As previously discussed, portions of the site required temporary eco-block shoring, which was installed successfully. The temporary shoring had no adverse impacts, and has since been properly backfilled. All excavation is stable through this date (June 1, 2009). 2. Tempora[y Shoring: Previously discussed and verified. All temporary shoring has been successfully backfilled. 3. Soi Bearina: The dense, native subgrade soils provided 4,000 p.s.f. bearing capacity. All foundations have been properly placed and are geotechnically approved. SOILS e FOUNDATIONS SITE DEVELOPMENT e INSPECTION * DRAINAGE 0 DESIGN& PERMIT 0 LEGAL P.O. Box 55502 Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 City of Edmonds Re: Michel Construction, Inc., 316 Walnut June 1, 2009 Page 2 4. Subsurface Drainage Installation: This engineer's inspections verified proper placement of subsurface drainage and drainage material along the exterior foundation stem walls. See photographs. Approved. 5. Erosion Control: Contractor continues to properly maintain the temporary erosion control measures: rocked alleyway construction entrance, perimeter siltation fencing, and confinement of all work within property lines. There have been no adverse erosion control problems to date (June 1, 2009). Inspections ongoing, as required by City of Edmonds. SUMMARY: Continuing geotechnical inspections have verified the stability of the foundations, excavation, subsurface drainage, backfill (to date) and temporary erosion control measures. 0 Periodic geotechnical inspections will continue, as required by City of Edmonds. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical /Civil Engineer DMB:vlb cc: Michel Construction Inc. 0 16CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN MEMO Date: July 7, 2009 Reference project: 316 Walnut Reference Permit# 2008-0031 It is acceptable to use I inch diameter x 12" Simpson expansion bolts to attach the steel tube columns to the footings. Alex K Moroseos, P.E., S.E. 0 0q 369 "61 L ONTAI. 11006 60TH AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 0 Dennis M. Bruce, P.E. M.S.C.E., MBA Geotechdcal / Civil Engineer October 9, 2009 City of Edmonds 1-21 Fifth Avenue North Edmonds, WA 98020 Subject: Field Reports/ Geotechnical Inspections 316 Walnut St., Edmonds, Washington Michel Construction Multi -Unit Building City of Edmonds Permit No. 2008-0031 kfic,ROFILM This engineering report presents the results of ongoing geotechnical inspections for the multi -unit building at 316 Walnut Street. These inspections were required by the City of Edmonds Special Inspection Agreement dated December 2, 2008. REFERENCES: • Geotechnical Report by D. Bruce, P.E., dated January 15, 2008 • July 8, 2008 Soil Cut Temporary Shoring Plan by D. Bruce, P.E. • City of Edmonds Inspection Authorization Agreement • Previous inspection reports and photographs INSPECTIONS: This engineer continues to perform on -site inspections as required by the City of Edmonds Testing Agreement regarding geotechnical aspects. 1. Excavation: As previously discussed, all excavation for this site has remained stable throughout the project. Portions of the site did require temporary eco- block shoring, which was properly installed, and has since been properly backfilled. 2. Temporary Shoring: All temporary eco-block shoring was properly placed, remained stable throughout the entire project, and has been successfully backfilled. Approved. 3. Soil Bearing: The dense, native subgrade soils provided 4,000 p.s.f. bearing capacity. All foundations have been properly placed and are geotechnically approved. SOILS * FOUNDATIONS * SITE DEVELOPMENT * INSPECTION * DRAINAGE * DESIGN & PERMIT * LEGAL P.O. Box 55502 * Shoreline, Washington 98155 * (206) 546-9217 * FAX (206) 546-8442 0 0 City of Edmonds Re: Michel Construction, Inc., 316 Walnut October 9, 2009 Page 2 4. Subsurface Drainacie Installation: This engineer's inspections verified proper placement of subsurface drainage and drainage material along the exterior foundation stem walls. See photographs.' Approved. 5. Backfill: This engineer inspected and verified that all backfilled was properly completed. Free draining granular material was placed in compacted lifts under this engineer's inspections. Approved. 6. —Erosion Control: To date (October 9, 2009), contractor continues to properly maintain the temporary erosion control measures: rocked alleyway construction entrance, perimeter siltation fencing, and confinement of all work within property lines. There have been no adverse erosion control problems to date (October 9, 2009). Inspections ongoing, as required by City of Edmonds. SUMMARY: Continuing geotechnical inspections have verified the stability of the foundations, excavation, subsurface drainage, all backfill for entire project, and proper temporary erosion control measures. 0 Periodic geotechnical inspections will continue, as required by City of Edmonds. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical /Civil Engineer DMB:vIb cc: Michel Construction, Inc. 0 VAR 12 2010 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical/CiW Engineer March-8,2010 Vil 4 ROPLA City of Edmonds Development Services Division 121 Fifth Avenue North Edmonds, WA 98020 Subject: Final. Report - Geotechnical Inspections 61 ' 8 Glen Street Michel Construction Multi-Unft Project Permit No. 2006-0955 This engineering report presents the final results of geotechnical inspections for the mult-unit Michel Construction project at 618 Glen Street. These inspections were . required as a condition of permit by the Cfty of Edmonds Testing Agreement dated February 7, 2007. REFERENCES: • City of Edmonds approved project plans • Geotechnical and Inspection Reports by D_ Bruce, P.E. • Site photographs IN$PECTIONS: This engineer has performed on -site geotechnical inspections as required by the City of Edmonds. All geolechhical'ihs""pection items have noW been properly completed, including permanent erosion control measures, landscaping and rockeries. Edmonds lngMction Items / Summa[y: 1. Excavatign: Previously verified and approved. 2. Soil Bearing: Previously verified as to proper placement of structural fill and all foundation elements properly placed. 3. Structural Fill: Previously inspected and approved. SOILS * FOUNDA77ONS - SITE DEVELOPMENT * INSPEC77ON w DRAINAGE * DESIGN& PERMIT * LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-6442 City of Edmonds Re: Michel Project, 618 Glen Street March 8, 2010 Page 2 4. Foundation Bea "n: Previously inspected --and approved. , � 5. Subsurface Drainage: Installed and approved. 6. Erosion Control: This engineer has performed periodic inspections, particularly during periods of heavy rains and any snowfall events. No adverse erosional impacts -were observed. Contactor properly maintained siltation fencing, rocked construction entrance, and confinement of all work within property limits. Ei—nal inspection verified all permanent erosion control measures have been properly completed: landscaping rockeries and landscaping (including beauty bark placement, shrubbery, and lawn). There are no exposed earth surfaces. All permanent erosion control measures have been properly completed and are geotechnically approved. SUMMARP. All geotechnical inspection items per City of Edmonds have been properly completed, including all permanent erosion control measures and stabilization rockery walls. 0 This report completes geotechnical inspection duties by D. Bruce, P.E. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical /Civil Engineer DMB:vlb cc: Michel Construction OCT-23-2010 11:12AM NO, 133 P. 1 Dennis M. Bruce, RE, M.S.C.E., M.B.A. Geotechnical /Civil Engineer October 12,2009 City of 5dmonds jo 121 Fifth Avenue North WAOFILM Edmonds, WA 96020 Subject: Final Report/ Geotechnical Inspections 316 WaIntst St., Edmonds, Washington Michel Construction MUM -Unit Building City of Edmonds Permit No. 2008-0031 This engineering repdrt presents the ftW results of ongoing geotechnical inspections for the multl-unit building at 316 Walnut Street, These Inspections were required by the City of Edmonds Special Inspection Agreement dated December 2, P-008, EMMERNGES: * Gootachriloal Report by 0, Bruce, P.E,, dated January 16, 2008 9 July 8, 2008 Soil Out Temporary Shoring Plan by D, Bruce, P,E. # City Of 50monds Inspection Authorization Agreement is Previous inspection reports and photographs 1N$EE_CTIJ0NS: This engineer has pefformed on -site inspections as required by the City of 5-dMonds Testing Agreement regarding geotechnical aspeots. 1 - 9namdLm: Stable throughout#*4�Mject and properly backfilled. ApjItMd. 2. lomporary Sibprtng�. All'temporary eco-block shoring was properly plamd, remained stable throughout the entire projeot, and has been successfully backfilled. Ap-prQyAd. 3. UlLgmdW: The dense, native subgrade soils provided 4,000 p,s.f. bearing capacity. All foundations have been properly placed and are geotechnically aniammed SOILS 9 FOUNDATIONS * S17 DEVELOPMENT P INSPECTION 4, DRAINAGE P DESIGN& PERMIT * LEGAL I P.O. Box 55502 - Shoreline, WA 9s155 - (206) 546-9217 - FAX (206) 64.6-8442 OCT,213.2010 11:12AM 10 le NO. 13 3 P. 2 City of Edmonds Ple: Michel Construction, Inc., 316 Walnut October 12, 2010 page 2 4, inomn InMA11 : This engineer's Inspections X91KM proper placement of subsurface drainage and drainage material along the exterior. foundation stem walls, See photographs. AjaMygA. BAOUL This enginoor Inspecteo and verified that all bgokfilled was properly Completed. Free draining granular mat erial was placed in compacted lifts under this engineer's inspections, AVAMod. 6. Eros!Qa _Control: Throughout the project, the contractor properly maintained all temporary erosion control measures,, rocked alleyway construction entrance, perimeter siltation fencing, and confinement of all work within property lines. Permanent Erosion Control Measures: This engineer's recent (October 6, 2010) inspection "M Ue that ail permanent erosion control measures were properly installed, There are no exposed earth Surfaces, Landscaping, plarifts, beauty bark, eta., has all been properly placed, The overall site Is gootechnically ft&, Ail special gootechnical inspection Items, Including permanent erosion control measures, have been properly completed and are mwtmd. I This report completes special engineering inspections by D. Bruce, RE. If there are any questions, do not hesitate to call. M. WA8 I Dennis M, Bruce, RE. Gootechnioal /Civil Engineer DMB:vlb 00: Michel Constrwotion, Ift 0 9 Inspection Comments BLD20080031 6 - Apartment/Condo New Applied: 01/18/2008 Issued: 02/13/2011 Address: 316 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION 1001 - E-Erosion Control/Mobilization 03/17/2009 Zulauf INC 01/07/2011 LAMBERTJ CMP 1013 - E-Storm Tightline 05/01/2010 ZULAUF COM 05/13/2010 lambertj INC 06/29/2010 ZULAUF 03/03/2011 LAMBERTJ 1015 - E-Storm Detention System 05/07/2010 lambertj 01/07/2011 LAMBERTJ 03/03/2011 LAMBERTJ 1052 - B-Retaining Wall Forms/Location 01/07/2011 LAMBERTJ 03/03/2011 LAMBERTJ 1060 - E-Fire/Aid Address Sign 03/03/2011 LAMBERTJ 1077 - E-Engineering Final 10/26/2010 MCCONNELL 01/07/2011 LAMBERTJ 03/03/2011 LAMBERTJ 03/08/2011 LAMBERTJ 1106 - B-Setbacks 09/28/2009 steinike 11/05/2009 steinike 1108 - B-Footings 04/14/2010 steinike 1110 - B-Foundation Wall 04/14/2010 steinike 1126 - B-Plumb Rough In 11/12/2009 steinike 04/12/2010 steinike 1132 - 13-Exterior Sheathing 09/22/2009 steinike 11/05/2009 steinike 1136 - B-Shear Nailing 05/18/2010 steinike 1140 - B-Height Verification 09/22/2009 steinike 4/21/2011 2:39:04 PM COM CMP Keydslam Expires: 02/13/2012 tesc adequate J. McConnell on site - OK to final t/I along east and north side of building. ok to b/f Partial - Verified mudding and connection to detention system (see civils) west t/I connected to outfall end of detention-ok to backfill OK to final INC OK to backfill - Verified mudding COR J.McConnell was on site - Correction notice given - See attached CMP Final Approved COR Correction notice given - See attached CMP OK to final CMP Building inspected Com Final Geotech report attached. COR J.McConnell on site - Correction Notice given - See attached COR OK to final once abandoned water service line has been cut and capped at the main CMP Per J.McConnell - Public Works will cut and cap water service line - Final Approved INC CMP CMP CMP INC CMP INC CMP CMP CMP Meet on site gave correction notice. Reviewed Engineering letter. Reviewed Engineering letter. Not ready! Roof Sheathing Only! Page 1 of 2 ID DATE INSPECTOR ACTION COMMENT 1142 - B-Framing 04/06/2010 steinike INC Wrote correction Notice, Top Floor only! 04/07/2010 steinike INC Wrote Correction Notice! 04/14/2010 steinike INC Wrote Correction Notice. 04/20/2010 steinike INC Ok to Insulate, Waiting on Revision. 05/04/2010 steinike CMP 1144 - B-Wall Insulation/Caulk 04/22/2010 steinike INC 1 st and 2nd Floor Only! 05/04/2010 steinike CMP 1146 - B-Floor Insulation/Caulk 05/20/2010 steinike CMP 1150 - B-Sheetrock Nail 04/27/2010 lawler INC partial approval, shaft patches okay, shafts interiors complete 05/05/2010 steinike INC First Layer on lid ok. 05/11/2010 steinike INC 2nd layer ok! 05/25/2010 steinike INC Garage ok. 05/28/2010 steinike INC 1st layer lid in Garage and Column's. 06/04/2010 steinike CMP 1158 - B-Building Final 03/08/2011 STEINKE COR Gave Correction Notice! 03/17/2011 STEINKE CMP 1955 - F-Extinguishers 03/16/2011 SMITHM CMP APPROVED 1975 - F-Fire Dept Inspection 03/16/2011 SMITHM CMP APPROVED 1980 - F-Addressing Visibility 03/16/2011 SMITHM CMP APPROVED 1985 - F-Fire Final 03/16/2011 SMITHM CMP APPROVED 2000 - P-Planning Final 01/10/2011 CLUGSTON CMP Facades match approved ADB-06-149-, landscaping matches revised landscaping plan approved 11/3/10 3000 - B-Hydronics 04/14/2010 steinike CMP 3004 - X-Special Inspection 03/17/2011 STEINKE CMP 4/21/2011 2:39:04 PM Page 2 of 2 0 January 15, 2009 Ann Bullis Building Official City of Edmonds 121 5th Avenue North Edmonds, Washington 98020 Re: PCK20080031 Site Address: 316 Walnut St. Dear Ms. Bullis: This letter serves to request a plan check extension for 360 days on the above referenced plans due to the fact that this is a multi -family permit. If you have any further questions please call or e-mail. Sincerely, P Dwight McGrew Vice President UP Michel Construction Inc. 425.776.2211 E 0 July 3, 2008 Ann Bullis Building Official City of Edmonds 121 5th Avenue North Edmonds, Washington 98020 Re: BLD2008-0031 Site Address: 316 Walnut St. Dear Ms. Bullis: RECEIVED JUL 0 7 20M %TTY1'*0F"=W This letter serves to request a plan check extension for 180 days on the above referenced plans due to the fact that this is a multi -family permit. If you have any further questions please call or e-mail. Thank you, ra Dwight R. McGrew Michel Construction Inc. 425.776.2211 michelbz(? ,imlink.com -7 Umbaugh, Theresa From: Bullis, Ann Sent: Monday, July 07, 2008 6:53 AM To: Urnbaugh, Theresa Subject: FW: BLD2008-0031 Theresa, Please process and I will sign. Thanks, 1InI7 BUIUS, CBO Building Of .ficial City of Edinonds (425) 771-0220 bullis@ci. ednionds. wa. us ----- Original Message ----- From: Dwight McGrew [mailto:dwight@michelproperties.com] Sent: Thursday, July 03, 2008 12:52 PM To: Bullis, Ann Subject: BLD2008-0031 Am, Congratulations on the promotion, I suppose it has its good and bad points. Any way, I just wanted to get this plan check extension in as I will be out of town when it expires. Please email or call if you have any questions. WINKIIII-91 GARY HAAKENSON ITY OF EDMONDS MAYOR f 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmonds-wa.us DEVELOPMENT SERVICES DEPARTMENT 117 C. Planning - Building - Engineering June 20, 2008 Michel Construction Dwight McGrew 7907 212th St SW #102 Edmonds, WA 98026 Re: Building Permit Application: BLD2008-00-3) I / 7 Unit Condo Site Address: 316 Walnut Street Expiration Date: 7/18/08 Dear Dwight McGrew: The purpose of this letter is to inform you that the above refierenced permit application will expire on 7/18/08. According to Edmonds Cornmunity Development Code Chapter 19.00.005(A)(5), applications are only valid for a period of' 180 days unless a written request for extension is submitted to the Building Offictial. If an application extension is I granted it may only be extended for an additional 180 days For a total period of one year. If you need an extension on the subject permit application you must submit a request in writing to the Building Offictial prior to plan review expiration. Please be advised, once the permit application expires, the application materials and plans will be destroyed within ten working days. Also, if the project is pursued in the future a new permit application and new fees will be required. If you have any questions, please feel free to call our offices at 425-771-0220. S I rice -ely, Z --- T /R Otmua/ug//Pl/� h/ re Senior Permit Coordinator 1-\"1'emp\DST's\Master Letters\App Due to expire 10/2 1 /00 Incorporated August 11, 1890 Sister City - Hekinan, Japan Umbaugh, Theresa From: Bullis, Ann Sent: Wednesday, September 09, 2009 8: 10 AM To: Umbaugh, Theresa Cc: Steinike, Russell Subject: FW: Setbacks at 316 Walnut 9fi—EL LIU 4929 BLDG KING.pdf (16 KB FYI -- Russ will be notifying them of the deficiencies in the survey document. Ann Bullis, CBO Building Official City of Edmonds 121 5th Ave N Edmonds, WA 98020 425-771-0220 ----- Original Message ----- From: Rob Michel [maiIto:Rob@micheIproperties.com] Sent: Tuesday, September 08, 2009 9:35 AM To: Steinike, Russell; Bullis, Ann Subject: Setbacks at 316 Walnut Michael S. Morris, PLS Survey Manager LSA Engineering, Inc. 19400 33rd Avenue W. Lynnwood, WA. 98036 425-775-1591 mikem@lsaengineering.com 0 WALNUT STREET 32.50, 0, 32.50' 16.50' qll\3- 9 L -P�- r--f- :7 FTI z C-- FTI Cf) CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN RESPONSE LETTER 2 Date: 10-04-08 Reference project: PERMIT #2008-0031 ITEM 22 SEISMIC DESIGN Maximum considered earthquake spectral response accelerations Given position: Washington,Snohomish ....... WA,Area Lat = 47.805, Long = - 122.371 Short period, �� = 121.7 % of g I second period, S I = 42.7 % of g Site class and adjusted maximum spectral accelerations: Site class = D Site coefficient, F, = 1.01 Table 11.4-1 - Interpolated Site coefficient, F, = 1.57 Table 11.4-2 - Interpolated The adjusted maximum spectral response per § 11.4.3 S ms= F�Ss= 1.0](1.22) 1.23g Eq 11.4-1 S m 1 = F, S I = 1.5 7(0.43) 0.67g Eq 11.4-2 Design spectral accelerations parameters: S DS = 2/3S ms = 2/3(l.23g) = 0.82g Eq 11.4-3 S DI = 2/3S m, = 2/3(0.67g) = 0.45g Eq 11.4-4 !RUB Building category and importance factors: PF Category = I I (per Table 11.5-1) 0 Category = I (as defined per footnote a) Importance factor, 1, = 1.00 Seismic Design Category (SDC) Table 11.6-1, Pg 116 For S DS = 82.21g, SDC = D Table 11.6-2, Pg 116 For S DI = 44.78g, SIDC = D SDC D controls. Building system K. Light frame walls with shear panels - wood structural panels/sheet steel panels 11006 60'rH AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN R = 6.5 (Table 12.2- 1) 0 0 = 3.0 (2.5 for flexible diaphragm - Note 9) C,j = 4.0 Building element weights Level 3, Roof weight = 15.0 psf Exterior wall weight = 12.0 psf Interior partition wall weight = 10.0 psf Level 2, Floor weight = 22.0 psf Exterior wall weight = 12.0 psf Interior partition wall weight = 10.0 psf Level 1, Floor weight = 22.0 psf Exterior wall weight = 12.0 psf Interior partition wall weight = 10.0 psf Building weights lumped on roof and floor diaphragms Total levels = 3 At Roof Level W R = Roof weight x Area + 1/2 x Partition weight x Area + 1/2 x Ext Wall weight x Perim x Height W R = 15.0 psf x 5714 sq.ft. + 1/2 x 10.0 psf x 5714 sq.ft. + 1/2 x 12.0 psf x 325 ft x 8.0 ft = 129880 lb At Floor Level 2 At typical floor level, Wp- Floor weight x Area + Partition weight � Area + (1/2 Ext Wall-upr + 1/2 Ext Wall-lwr) x Ave Perim x Ave Height W2= 22.0 psf x 5828 sq.ft. + 10.0 psf x 5828 sq.ft. + (1/2 x 12.0 psf + 1/2 x 12.0 psf) x 328 ft x 9.0 ft = 221896 lb At Floor Level I 141 22.0 psf x 6090 sq.ft. + 10.0 psf x 6090 sq.ft. + (1/2 x 12.0 psf + 1/2 x 12.0 psf) x 330 ft x 10.0 ft = 234480 lb Total weight 129880 + 221896 + 234480 586256 lbs Compute structure period Structure type: All other structures Cl = 0.020 (Table 12.8-2) Structure height, h. = 28.00 ft. T. = C7-(h� )34 = 0.020(28.00 )114 = 0.243 sec. (Eq 12.8-7) Compute base shear 11006 60'm AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTON ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN The design value of C, is the smaller value of 1,S DS/ R = 1.00(0.82)/6.50 0. 1265 EQ 12.8-2 and C, = 1, S (R T,, 1.00(0.45)/[(6.50)(0.24)] = 0.2830 EQ 12.8-3 but not less C' =0.01 EQ 12.8-4 Therefore C, = 0. 1265 Design base shear, V= C, W= 0.126(586256) = 74145 lbs (74.1 kips) Eq 12.8-1 Vertical distribution of force F� = C�., V EQ 12.8-11 where Wx h k C" = - EWihi k Eq 12.8-12 Compute distribution component, k k = 1.0 for T,,:5 0.5 seconds, and k= 2 for T,> 2.5. Interpolate k for T,,between this range. T� = 0.243, k = 1.00 Level x k hx h lvx k ivx-h CIX Fx=C,,xV Fxlivx=S,, 3 28.0 28.0 129.9 k 3637 0.349 25.9 k 0.199 2 20.0 20.0 221.9 k 4438 0.426 31.6 k 0.142 1 10.0 10.0 234.5 k 2345 0.225 16.7 k 0.071 sum 586 k 10419 k-ft 74 k Compute diaphragm shear(s) per ASCE 7-05 §12.10.1.1 n I Fj Fp, = 1. =x W 11 Px Wi Min Fpx 0.20S DS 1, lVpx Max F,,., 0.40S DS I, lVp-, Level I vpx Fj Fp� Min F,,x Max Fp, Design Fpx 3 129.9 k 25.9 k 25.9 k 21.4 k 42.7 k 25.9 k 2 221.9 k 31.6 k 36.2 k 36.5 k 73.0 k 36.5 k 1 234.5 k 16.7 k 29.7 k 38.6 k 77.1 k 38.6 k Level Before Now %-dif 3 2S.7 25.9 1% 2 2S.6 31.6 23% 1 13.6 16.7 23% 11006 60"'" AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN Design Loads @ Level 3 Direction Wall Wind Force lb Seismic before(l) lb Seismic after(2) lb SW Length ft Total shear (3) Shear I b/ft SWID(4) REVISE DWG UPLIFT (5) I Grid 1 2355 7343 7416 23.17 7416 224.1 SW-2 1255 1 Grid 2 2791 8703 8790 57.51 8790 107.0 SW-1 599 1 Grid 3 2120 6611 6677 16.5 6677 283.3 SW-3 1586 1 Grid 4 1684 5251 5304 35.43 5304 104.8 SW-1 587 2 Gri A 2373 7449 7523 17.01 7523 309.6 SW-3 1734 2 Grid B 4503 14137 14273 44.51 14273 224.5 SW-2 REVISE 3.2.57 2 Grid C 2129 6683 6750 1 35.58 65��- SW-1 744 Notes: 1. Seismic design forces from original analysis. 2. Seismic design forces with additional gyperete loads. 3. Total shear is the summation of the shear forces above this level. 4. The original SW mark. 5. The revised SW mark. Des3xin Loads @ Level 2 Direction Wall Wind Force lb Seismic before lb Seismic after - lb SW length -------- --- ft Total shear Shear lb/ft SW ID REVISE DWG UPLIFT 1 Grid 1 2788 7149 8793 22.88 16210 495.9 SW-5 4463 1 Grid 2 330S 8473 10422 57.38 19212 234.4 SW-2 REVISE 2109 1 Grid 3 2S10 6437 7918 16.5 1459S 619.2 SW-5 5572 1 Grid 4 1994 5113 6289 33.76 11S93 240.4 SW-2 2163 2 Grid A 2672 6894 8480 19.63 16003 570.7 SW-6 5136 2 Grid B 5399 14021 17246 44.51 31519 495.7 SW-4 4461 2 Grid C 2727 1 7127 8766 30.13 15516 360.5 SW-4 REVISE 1 3244 11006 60' M AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN es±gn Loads @ Level 1 Direction Wall Wind Force lb Seismic before lb Seismic after lb SW length ft Total shear Shear lb/ft SW ID REVISE DWG UPLIFT 1 Grid 1 2938 3649 4488 18.89 20698 767.0 SW-6 6903 1 Grid 2 3483 4325 5320 1 42.51 24S32 404.0 SW-4 REVISE 3636 1 Grid 3 2646 3286 4042 74.63 18636 174.8 SW-1 1573 1 Grid 4 2101 2610 3210 40.14 14803 258.1 SW-3 REVISE 2323 2 Grid A 2833 3586 4411 29.01 20414 492.6 SW-4 REVISE 4433 2 Grid B 5690 7201 8857 45.25 40376 624.6 SW-5 5621 2 Grid C 2856 3616 1 4448 1 21.38 19964 653.6 1 SW-6 5883 ITEM 23 - See detail 1/S-2.4. ITEM 24 - The concrete wall w/its continuous footings can support the vertical loads. The columns which contact the slab have their own footings. Item 25 - Rockery to be designed by GEO-TECH. Item 26 - See attached deck post detail. This will be added to the arch. plans. ITEM 27 - Note e applies to abutting edges as the response before. We have added a new detail IC/S-1 to show stagger nailing @ double members. ITEM 28 - No blocking is required as the previous response and figure from the Til manufacturer indicates. Item 29- Detail 2B/S-2.2 shows maximum 1/4" over -hang. Item 30 - This is revised to detail 7/S-2.3. Item 31 - Same as item 29. Item 32 - See detail 2/S-2.1& 3/S-2.1. These details are referenced from section 1/S-2.1. Item 33 - See detail 3/S-2.1 & 3/S-2.2. Item 34 - See detail 1/S-2.4 (as stated before). 11006 60M AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 CUSTOM DESIGN & ENGINEERING, INC STRUCTURAL ANALYSIS & DESIGN Item 35 - See detail 1/S-2.3 (as stated before). The wall is fully reinforced at the ledge support the reaction is only 20 kips. Item 36 - See detail 1/S-2.4 (as stated before). Item 37 - Same as item 36. Item 38 - TJI's can be used provided the deck, is fully water proofed. Item 39 - Detail 1/S-2.2 can eb used. Item 40 - See details 3/S-2.3 & 4/S-2.3. Item 41 - Again, see detail 10/S-2.3. Item 42 - CCQ connectors are shown on plan. Item 43- Detail 3/S-2 shows the HI clips for uplift. Alex K Moroseos, P.E., S.E. 1100660 TH AVE WEST - MUKILTEO WA 98275 PHONE (425) 343-7517 - FAX (425) 493-8388 0 2 X PT PLATE (RIP FROM 2 X 12) JOIST PER PLAN 0 4X4 PTHF1 POST 9 5 FT O.C. (MAX) (4) 16d COMMONS (JOIST TO PLATE) (4) 16d COMMONS 2 x 10 PT BLOCKING TYPICAL DECK POST MOUNTING DETAIL 4X4 PTHF1 POST 9 5 FT O.C. (MAX) 2 X MOUNTING PLATE 24" -�_ \\— 2 X 10 PT BLOCKING JOIST PER PLAN 2 X 10 PT BLOCKING I McConnell, Jeanie From: Rob Michel [rob@michelproperties.com] Sent: Thursday, April 17, 2008 8:17 AM To: Gebert, David Cc: Bowman, Duane; McConnell, Jeanie; Donna L. Breske; Dwight McGrew Subject: Re: 316 Walnut - bld20080031 Plan Review Comments *2nd request* Two Reasons: In order not to have over 14% driveway grade. we cannot provide a CB in the alley with a 1211 pipe and provide COE policy coverage over that pipe. We want grade the alley to have drainage flow to existing CB. If I recall those were similar reason for the change on 4th Ave S. Also the change granted on 4th Ave S was not only a 2% to a 4% slope from the crown, you allowed a 4% slope from the gutter on west side of the roadway all the way to the east gutter. Thanks Rob On Apr 17, 2008, at 7:53 AM, Gebert, David wrote: > Rob, > If there is a good, compelling reason, we should be able to approve > 4%. • However, we will need to know the reason and agree that it is • compelling. * Can you please give us an explanation of the reason why you must * have a * 4% cross slope in the alley. > Dave • ----- Original Message ----- • From: Rob Michel (mailto:rob@michelproperties.comI • Sent: Thursday, April 17, 2008 7:42 AM • To: Gebert, David - • Cc: Bowman, Duane; McConnell, Jeanie; Donna L. Breske; Dwight McGrew • Subject: Re: 316 Walnut - bld20080031 Plan Review Comments *2nd • request* • Dear David: • We will be submitting a change with the majority of the alley sloping • 4% to the east just like you approved for 4th Ave S. • I wanted your approval before your retirement so there would be no • confusion when you are gone. • I hope to get a response before tomorrow. • Good luck on your future and thank you for your years of service to • Edmonds. • Sincerely, • Rob > On Apr 17, 2008, at 7:08 AM, Gebert, David wrote: >> Rob, 1 *>'In looking at your clearing and grading plans, they show fat the >> majority o * f the alley between 3rd and 4th will slope at 1% down from >> east to west. Your plans show a small area at the north end of the >> alley sloping at 4% where the alley transition to the street >> which is >> shown to slope 5.4% down from east to west. If this is what you are >> talking about, this is acceptable and we can approve it. >> If you are talking about something else, please provide us further >> explanation. >> Dave >> ----- original Message ----- >> From: Rob Michel [mailto:rob@michelproperties.comI >> Sent: Thursday, April 17, 2008 6:41 AM >> To: Gebert, David; Bowman, Duane >> Cc: Mctonnell, Jeanie; Donna L. Breske; Dwight McGrew; Scott >> Schlumberger >> Subject-: Re: 316 Walnut - bld20080031 Plan Review Comments *2nd >> request* >> Dear David and Duane: >> You may remember the three of us had a meeting at 4th Walnut to >> discus ' s site,distance challenges at my apartments because the City of >> Edmonds allowed the developer at 400 Walnut street to grade 4th >> Avenue >> without a crown and slope the entire street West to East at 4% grade. >> I claimed this would cause site distance problem with my property but >> you both disagreed. >> Now we are requesting to grade the alley between 4th Avenue and 3rd >> avenue off of Walnut at 4% West to East. If you are not going to >> grant >> this request then I am requesting a meeting with you both as soon as >> you both are available. Thank you. >> Rob O� OV LQ41, CITY OF EDMONDS 121 5T H AVENUE NORTH - EDMONDS,WA 98020 P HONE: (425) 77 1-0220 - FAX: (425) 77 1-0221 STATUS: ISSUED 12/9/2008 Pem& #: BLD20080984 BUILDING PERMIT Expiration Date: 12/9/2009 Project Address: 316 WALNUT ST, EDMONDS Parcel No: 27032300414400 PROPERTY OWNER APPLICANT CONTRACTOR 316 WALNUT sT CONDO WALNUT STREET 7-UNIT CONDO WALNUT STREET 7-UNIT CONDO 7907 212TH ST SW # 102 7907 212TH ST SW # 102 7907 212TH ST SW # 102 EDMONDS, WA 98026 EDMONDS, WA 98026 EDMONDS, WA 98026 425-776-22 1 1 425-776-2211 425-776-2211 LICENSE MICHEC1061 D5 EXPA/19/201 0 JOB DESCRIPTION GRA DfNG/SHORrNG ONLY VALUATION: $0 PERMIT TYPE: Commercial PERMIT GROUP: 28 - Fill/Grade/Excavate GRADING: Y CYDS: 2790 TYPE OF CONSTRUCT IONi GRADE/SHORING RETAININGWALLROCKERY: Y OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2006 OTHER: N ------- OTHER DESC: ZONE: RM-1.5 NUMBER OF STORIES: 0 VESTED DATE� NUMBER OF DWELLING UNITS: 0 F-XIS'nNG AREA IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 PROPOSED AREA IBASEMENT: 0 1 ST FLOOR: 0 —2ND FLOOR. 0 13RD FLOOR: 0 GA RAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GA RAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDESETBACK REAR S ETBACK REQUIRED: PROPOSED: — IREQUIRED: PROPOSED: IREQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. TH,l&VP&fA/J0q,4 N031�'PERMIT UNTIL SIGNED BY THE BUILDI�G OFFICIAL OR HISIHER DEPUTY AND ALL F S . AR AID. � IWAVI&��. � ', 1W - ),Q /M12 ��7 FEN 0 0 Blatlelz IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUP A NCY HAS BEEN GRANTED. UBC109/IBC I 10/ 1 RC 110. ARCHIVE APPLICANT ASSESSOR �IOTI*R 0 0 STATUS: ISSUED BLD20080984 CONDITIONS 0 SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING. Excavation., Grading, and Site Preparation Shoring Installation and Monitoring Submit Special Inspection Field reports on a weekly basis to the City Building Department. • This permit is issued for grading, temporary shoring and utility/civil work only. Any work done outside the scope of this permit will result in quintuple building investigation fees pursuant to city ordinance 967. • REQUIRED SPECIAL INSPECTIONS FORTHIS PROfECT: 1) Excavation, grading, & site preparation 2) Subsusrface Drainage Installation 3) Temporary Erosion Control 4) Final Erosion Control 5) Shoring Installation and Monitoring. 6) General site monitoring 7) Final letter from geotechnical engineer of record • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. • Any request foralternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval ofany plat orplan containing provisions which do not comply with city code and forwhich avariance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. 9 Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 0 Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests. agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees ., and agents from any and all claims for damages of whatever nature, aris ing directly or indirectly from the issuance fo th is permit, Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to en force any ordinance provision. 0 Cross -Connection control assemblies, for back -flow prevention, are required on the following fixtures, Verify meeter/backflow assembly type and specifications. 0 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, ext. 1326. 9 Maintain erosion & sedimentation control per city standards. 0 Call for required inspections as noted and prior to backfill. 0 Maintain 19 seper-ation between the sanitary side sewer and the water service line. 0 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the pen-nitted project. I iNsPEHIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECOC 19.00.005(A)(6) F BUILDING (425) 771-0220 EXT. 1333 1 fNGUYMUNG (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 PUBLIC WORKS (425) 7 1-0235 1 PRE-TREATMENT (425) 72-5755 RECYCLING (425) 275-4801 When calling for an inspection please leaw the follov�ing information: Permit Number, Job Site Address, Type of Inspection being 0 0 I requested, Contact Name and Phone Number, Date Prefereed, and %hether you prefer morning or afternoon. I EPre-Con • EErosion Control/Mobilization • ETraffic Control • EStorm Tightline • EStorm Detention System • E-Footing Drywell • E-Sewer Lateral/Main Inspection • ESewer Lateral/Main Pressure Test • E-Water Service Line • EDouble Check Detector Assem Vault • E-Remote Reader Installation • B-Retaining Wall Special Inspection • E-Retaining Wall Drainage • E-Trash Enclosure • E-Cross Connection Final • E-Engineering Final • B-Building Final • E-Double Check Valve Assembly 0 9 Inspection Comments BLD20080984 28 - Fill/Grade/Excavate Applied: 12/01/2008 Issued Address: 316 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION 1001 - E-Erosion Control/Mobilization 03/17/2010 ZULAUF COM 01/07/2011 LAMBERTJ CMP 1002 - E-Traffic Control 03/03/2011 LAMBERTJ CMP 1013 - E-Storm Tightline 06/29/2010 ZULAUF INC 03/03/2011 LAMBERTJ CMP 1015 - E-Storm Detention System 03/03/2011 LAMBERTJ CMP 1025 - E-Sewer Lateral/Main Inspection 01/07/2011 LAMBERTJ CMP 1034 - E-Water Service Line 06/09/2010 MCCONNELL CMP 1036 - E-Double Check Detector Assem Vault 03/08/2011 LAMBERTJ CMP 1037 - E-Remote Reader Installation 01/28/2011 MCMURPHY CMP 1054 - E-Retaining Wall Drainage 03/03/2011 LAMBERTJ CMP 1075 - E-Trash Enclosure 01/07/2011 LAMBERTJ CMP 1076 - E-Cross Connection Final 01/28/2011 MCMURPHY CMP 1077 - E-Engineering Final 01/07/2011 MCCONNELL Cory 03/08/2011 LAMBERTJ CMP 1158 - B-Building Final 03/18/2011 LAWLER CMP 3000 - E-Fire vault gutter drain 06/03/2010 LAMBERTJ CMP 3012 - E-Double Check Valve Assembly 01/28/2011 MCMURPHY CMP 12/09/2008 COMMENT tesc ok Final Approved Final Approved Expires: 12/09/2009 connection to nw catch basin, ok to b/f OK to final Final Approved Lateral was not replaced Okay to backfill. Public Works installed meter setter. Copper pipe ran from setter to building, around east side of DCDA vault. Shut off on east side of vault installed for future connection of irrigation system & backflow. See separate fire connection permit signed off To be inspected by the Geotechnical Engineer J.McConnell on site - Final Approved signed off Corrections - attached. Per J.McConnell Public Works will cut and cap the water service line - Final Approved Per Jeanie McConnell - OK to connect gutter drain of the fire vault lid to the tightline system - Verified connection Cross connection approved 4/21/2011 2:12:41 PM Page 1 of 1 OV E 1) 'If 0 UP CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX (425) 771-0221 STATUS: ISSUED 10/17/2008 Pennit #: BLD200808691 BUILDING PERMIT Expirution Date: 4/15/2009 Project Addre.ss: 4 04 4TH AVE S, EDMONDS Parcel No: 27032300413800 PROPERTYOWNER APPLICANT CONTRACTOR ROB MICHEL ROB MICHEL MICHEL CONSTRUCTION 7907 212TH ST SW # 102 7907 212TH ST SW # 102 7907 2- 1 2T H SIX # 102 EDMONDS, WA 98026 EDMONDS, 'A"A 98026 EDMONDS. WA 98026 LICENSE #: MICHEC1061D5 EXPA/1-9/201 0 JOB DESCRI[PTION DEMOLISH APPROXIMATELY 3600 SF SFR. TO BE USED FOR FIRE AND POLICE TRArNING. :J PSCAA4 200802786 VALUATION: $0 CL PERMIT TYPE: Residential PERMIT GROUP: 23 - Demolition GRADING� N CYD& 0 TYPE OF CONSTRUCTION: DEMO RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N 1, 0 X 0 FT.) CODE: 2006 JOTHER: N ------- OTHER DESC: IZONE INUMBER OF STORIES: 0 VESTED DATE: INUMBER OF DWELLING UNITS: 0 J EUSTLNG AREA JBASEMENT� 0 1 ST FLOOR: 0 2ND FLOOR: 0 PROPOSEDAREA IBASEMENT: 0 1 ST FLOORi 0 ND FLOOR: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDESETBACK REARSETBACK REQUIRED: PROPOSED: IREQUIRED: PROPOSED: IREQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCErND RCW 18:27. L THISAPPLICATIT ISNOT A PERMIT UNTIL SIGNED BY THE BUILDINGOFFICI \0 R HISJHAR QEPUTY AND ALL FEESIRE PID. 7//) V Signature f \ Print Name Date ATTENTION IT IS LIN LAWFUL TO USE OR OCCUPY ABU I LDING OR STRUCTU RE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CER-nFiCATE OF OCCUP A NCYHAS BEEN GRANTED. UBC109, I BC I 10, IRCI 10. ARCHIVE APPLICANT ASSESSOR E 0 STATUS: ISSUED BLD20080869 CONDITIONS • *Pre -inspection required. *Street to be cleaned of debris. *Side sewer must be capped at property line. *Water Service must be disconnected iromWater meter and orhose bib with AVB installed. *Dump at approved dump site only. *See demolition inspection check -list oil back ofjob card for inspection requirements. • Final approval on a project or filial occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and filial occupancy inspections. • Any request for alternate design, modification. variance or other adininistrative deviation (hereinafter-v arian ce") from adopted codes, ordinances orpolicies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval ofany plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Sound/Noise originating from temporary construction sites as a result of construction activitv are exempt from the noise limits ofECC Chapter 5.30 only during the hours of 7:00am to 6:00pmon weekdays and 10:00am and 6:00pmon Saturdays- excluding Sundays and Federal Holidays. At all othertinles tile noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Applicant.. on behalf of his or her Spouse. heirs. assigns. and successors in interests. agrees to indemni�- defend and hold harmless the City of Edmonds, Washington, its officials, employees. and agents from any and all claims for damages of whatever nature. ans Ina directly or indirectly from the issuance fo this pen -nit. Issuance of this perrilit shall not be deemed to modil�, waive or reduce any requirements of any City ordinance not limit in any way the City's abilit\ to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL POR INS PECTIONS BUILDING (425) 771-0220 EXT. 1333 ENGINEERING (425) 771-0220 EXT. 1326 FIRE (425) 771-0215 I PUBLIC WORKS (425) 771-0235 1 PR&TREkTNIENT (425) 672-5755 1 RECYCLING (425) 275-4801 When calling for an inspection please leave the folloAing information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and "bether you prefer morning or afternoon. • E-Pre-Demolition SeNver Cap • E-Pre-Derno Water Sen, Discnct/AVB • E-Pre-Demo Erosion Control • E-Engineering Final Derno • B-Pre-Demolition • B-Asbestos PSCAA Permit • B-Cleaned Site/Bld Final Demolition 0 0 Inspection Comments BLD20080869 23 - Demolition PERMIT Applied: 10/17/2008 Issued: 10/17/2008 Expires: 04/15/2009 Address: 404 4TH AVE S, EDMONDS ID DATE INSPECTOR ACTION COMMENT 1078 - E-Pre-Demolition Sewer Cap 10/23/2008 larnbertj CMP Sewer Cap Verified 1079 - E-Pre-Demo Water Sery Discnct/AVB 10/24/2008 Sibrel CMP Approved. 1080 - E-Pre-Demo Erosion Control 10/24/2008 Sibrel CMP Tesc OK 1081 - E-Engineering Final Demo 03/17/2009 Zulauf CMP ok to final 1104 - B-Cleaned Site/Bid Final Demolition 03/18/2011 LAWLER CMP 4/21/2011 2:14:54 PM Page 1 of 1 OV E D'If Lr- CITY OF EDMONDS 121 5T H AVENUE NORTH - EDMONDS,WA 98020 P HONE� (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 10/17/2008 Pernit#: BLD20080868 Expiration Date: 4/15/2009 Project Address: 320 WALNUT ST, EDMONDS Parcel No: 27032300414900 PROP-V,"rl ONVVIN Af'PL1CAP;T C1vf1'1'01-II,C'1'I1w& ROB MICHEL ROB MICHEL MICHEL CONSTRUCTION 7907 212TH ST SW # 102 7907 212TH ST SW# 102 7907 212T H SW # 102 EDMONDS, WA 98026 EDMONDS. "'A 98026 EDMONDS, WA 98026 LICENSE #: MICHECI06ID5 EXPA/19/2010 JOB DESCRIPTION DEMOLISH APPROYJMATELY2500 SF SFR. TO BE USED FOR FIRE AND POLICE TRAINING. PSCAA# 200802786 -,7q VALUATION: $0 PERMIT TYPE: Residential PERMIT GROUP: 23 - Demolition GRADING: N CYDS: 0 TYPE OF CONSI'RUCT ION: DEMO RETAININGWALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE 2006 IOT HER: N ------- OTHER DESC: IZONE INUMBER OF STORIES: 0 VESTED DATE- INUMBER OF DWELLING UNITS: 0 EUSnNG AREA BASEMENT: 0 1 ST FLOOR- 0 2ND FLOOR: 0 PROPOSED AREA IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 13R.D FLOOR: 0 GARAGE. 0 DECK: 0 OTHER: 0 13RD FLOOR� 0 GA RAGE: 0 DECK: 0 OTHER: 0 FRONTSMACK SIDESETBACK REARSMACK REQUIRED: PROPOSED: IREQUIRED: PROPOSED: IREQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O IREQUIREDi PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WIT H CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING T HE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANC ND RCW 13:27. THISAPPLICATION IS�AOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIUA OR HISIRIiR DEPUTY AND ALL FEESARE PAID. U, F/T-, AIM L M WE � Mo I z Name Date ATTENTION By IT IS UNLAWFUL TO I. ISE OR OCCUPY A Bt: I LDING OR STRUM: RE I INTIL A FINAL INSPE(-TION 14 AS BEEN MADE AND A PPROVAL ORA CERTIFICATE OF OCCUPANC) HAS BEEN GRANTED. L 13009 IBC1 10 IRCI 10. ARCRIVE APPLICANT ASSESSOR THER D�o 0 0 STATUS: ISSUED BLD20080868 CONDITIONS • *Pre -inspection required. *Street to be cleaned ot'debris. *Side sewer must be capped at property line. *WaterService must be disconnected fi-oni Water meter and orhose bib with AVB installed. *Dump at approved dump site only. *See demolition inspection checklist on back- ofJob card for inspection requirements. • Final approval on a proJect or final occupancy appro\ al must be granted by the Building Official prior to use or occupancy of the buildin- or structure. Check, the Job card ibr all required City ilispections including final project approval and final occupancy inspections. • Any request foralternate design. modification. variance or other adrninistrative deviation (hereinafter "valiance") from C; adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a valiance has not been specifically identified.. requested and considered bv the appropriate city official in accordance with the appropriate provision of city code orstate law does not approve any Items not to code specification. • SoundfNoise originating from temporary construction sites as a result of construction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of'T.00arn to 6:00prn on weekdays and 10:00am and 6:00prn on Saturdays. excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with tl�e noise limits ot'Chapter 5.30. unless a valiance has been granted pursuant to ECC 5.30.120. • Applicant. on behalf'of his or her spouse. heirs. assigns. and successors in interests. agrees to indemni�- defend and hold harm.less the City of Edmonds, Washington.. its officials. emplo\ ces- and agents from any and all claims for damages of whatever nature. ansing, directly or indirectl\ from the issuance I-o this perrnit. Issuance of this perrnit shall not be deemed to modif�, waive or reduce anv requirements of an\ Cit\ ordinance not limit in an,,. way the City's ability to enforce any ordinance provision. I INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS. MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INS PECTIONS I BUILDING (425) 771-0220 EXT. 1333 E:NGINEERING (425) 771-0220 EXT. 1326 FIRE (425) 771-0215 1 I PUBLIC WORKS (425) 771-0235 1 PRE-TREATNIENT (425) 672-5755 RECYCLING (425) 2754801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E-Pre-Dernolition Sewer Cap • E-Pre-Demo Water Sery Discnct/AVB • E-Pre-Demo Erosion Control • E-Eneineerine Final Demo • B-Pr�-Dernolition • B-Asbestos PSCAA Pern-lit • B-Cleaned Site/Bid Final Demolition E E Inspection Comments BLD20080868 23 - Demolition PERMIT" Applied: 10/17/2008 Issued: 10/17/2008 Expires: 04/15/2009 Address: 320 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION COMMENT ...... ........... . ... .............. . .. ..... 1078 - E-Pre-Demolition Sewer Cap 10/23/2008 larnbertj CMP Sewer Cap Verified 1079 - E-Pre-Demo Water Sery DiscncVAVB 10/24/2008 Sibrel CMP Approved 1080 - E-Pre-Demo Erosion Control 10/24/2008 Sibrel CMP TESC OK 1081 - E-Engineering Final Demo 03/17/2009 Zulauf CMP ok to final 1104 - B-Cleaned Site/Bid Final Demolition 03/18/2011 LAWLER CMP 4/21/2011 214:20 PM Page 1 of 1 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS.WA 98020 PHONE: (425) 771-0220 - FAX� (425) 771-0221 C) STATUS: ISSUED 10/17/2008 Pe rnjit #: B LD-2-0 0 8 0 86 7 BUILDING PERMIT Expikation Date: 4/15/2009 f1r9ject Address: 318 WALNUT ST, EDMONDS. Parcel No: 27032300414400 PROPERTYOWNER APPLICANT CONTRACTOR ROB MICHEL ROB MICHEL MICHEL CONSTRUCTION 7907 212TH ST SW # 102 7907 212TH ST SW # 102 7907 2 1 2T H SW # 102 EDMONDS, WA 98026 EDMONDS, WA 98026 EDMONDS: WA 98026 LICENSE 4: MICHEC1061 D5 EXPA/19/201 0 JOB DESCRtPTION DEMOLISH APPRO)UMATELY 1900 SF SFR. TO BE USED FOR FIRE AND POLICE TRAINING PSCAA# 200802786 VALUATION: $0 PERMIT TYPE: Residential PERMIT GROUP� 23 - Demolition GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: DEMO RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD - FENCE: N ( 0 X 0 FT.) CODE: 2006 OTHER: N ------- OTHER DESC: ZONE: INUMBER OF STORIES: 0 VESTED DATE: INUMBER OF DWELLING UNITS: 0 EUSTLNG AREA PROPOSEDARIE-A IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 13 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13 RD FLOOR. 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONT S ETBACK S tDE S ETBACK REAR S ETBACK REQUIRED� PROPOSED: IREQUIRED: PROPOSED� IREQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSE �O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OFTHE STATE OF WASHINGTON RELATINGTO WOR.KMEN'S COMPENSATION INSURANCE AND RCW 18:27� THIS APPLICATION ISNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFIC)AT'QR HISI)JERfDEPUTY AND ALL FEESA�E PAIQ. Signature N Print Name Date ATTENTION By IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTU RE UNTIL A FINAL INSPECTION HAS BEEN MADE AND A PPROVAL ORA CERTIFICATE OF OCCUPANC)'HAS BEEN GRANTED. LIBC1091 IBCI I0,'IRCI 10. ARCHIVE APPLICANT = ASSESSOR OTHER 0 0 STATUS: ISSUED BLD20080867 CONDMONS • *Pre -inspection required. *Street to be cleaned of debris. *Side sewer must be capped at property line. *Water Service must be disconnected fromWater meterand or hose bib with AVB installed. *Dump at approved dump site only. *See demolition inspection checklist on back ofjob card for inspection requirements. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card ior all required City inspections including final project approval and final occupancy inspections. • Any request foralternate design, modification. variance or other administrative deviation (hereinafter "variance") from adopted codes. ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not con -ply with city code and for which a variance has not been specifically identified .. requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a resu It of construction activity are exerript from the noise limits of ECC Cliapter 5.30 only during the hours of 7:00am to 6.00pm on weekdays and I 0:00am and 6:00pm on Saturdays. excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant. on behalf of his or her spouse, heirs, assigns, and successors in interests. aprees to indemni� defend and hold harmless the City of Edmonds., Washington, its officials, en-ployees. and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fo this pen -nit. Issuance of this permit shall not be deemed to modifv. waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enibrce any ordinance provision. INS PECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUELDING (425) 771-0220 EXT. 1333 FIRE (425) 771-0215 I PUBLIC WORKS (425) 771-0235 1 PRE-TREATIVIENT (425) 672-5755 1 RECYCLING (425) 275-4801 When calling for an inspection please leave the folloving information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and"bether you prefer morning or afternoon. • E-Pre-Deniolition SexN-erCap • E-Pre-Demo Water Sery Discnct/AVB • E-Pre-Demo Erosion Control • E-Frip-ineerinq Final Demo • B-Pre-Demolition • B-Asbestos PSCAA Pen -nit • B-Cleaned Site/Bld Final Demolition 0 0 Inspection Comments BLD20080867 23 - Demolition P E R M I T-'-'-- Applied: 10/17/2008 Issued: 10/17/2008 Expires: 04/15/2009 Address: 318 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION COMMENT 1078 - E-Pre-Demolition Sewer Cap 10/23/2008 larnbertj CMP Sewer Cap Verified 1079 - E-Pre-Demo Water Sery Discnct/AVB 10/24/2008 Sibrel CMP Approved 1080 - E-Pre-Demo Erosion Control 10/24/2008 Sibrel CMP TESC OK 1081 - E-Engineering Final Demo 03/17/2009 Zulauf CMP ok to final 1104 - B-Cleaned Site/Bid Final Demolition 03/18/2011 LAWLER CMP 4/21/2011 2:13:59 PM Page 1 of 1 of E D'V CITY OF EDMONDS PHONE: (425) 771-0220 - FAX: (425) 771-0221 121 5TH AVENUE NORTH - EDMONDS,WA 98020 STATUS: ISSUED 1/15/2010 Pemdt#: BLD20100006� BUILDING PERMIT Expiration Date: 7/15/2010 Proiect Address: 316 WALNUT ST, EDMONDS! Parcel No: 27032300414400 1PROPERTYOWNER APPLICA11T CO11'14UkCT1f1A MICHEL CONSTRUCTION PROGRESSIVE AIR SYSTEMS PROGRESSIVE AIR SYSTEMS 7907 212TH ST SW # 102 17711 INTERURBAN BLVD 17711 INTERURBAN BLVD EDMONDS, WA 98026- SNOHOMISH, WA 98296- SNOHOMISH, WA 98296- (425) 776-2211 Ext. (360) 668-9948 Ext. (360) 668-9948 Ext. LICENSE #: PROGRAS002KC EXP:6/19/201 I JOB DESCRIPTION INSTALL ALL RELATED HVAC WORK TO INCLUDE INSTALLATION & VENTfNGOF FANS, VENTINGOF RANGEHOODS & DRYERS, GAS PIPrNQ rNSTALLINGHYDRONIC WALL HEATER SYSTEMS, FURNACES & AIRCONDITIONrNG. VALUATION: $0 �' ej� ��k 11 P-1 '� PERMIT TYPE: Commercial PERMIT GROUP: 40 - Mechanical/SolTr-". GRADING: N CYDS: 0 T YP E OF CONST RUCT ION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 06 OTHER: N ------- OTHER DESC: IZONE: RM-1.5 NUMBER OF STORIES: 0 lVESTED DATE: NUMBER OF DWELLINGUNITS: 0 ILOT #: LXISTING ARE-k IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 —FB—ASEMENT: PROPOSED AREA 0 1 ST FLOOR: 0 2ND FLOOR: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDESMACK REARSETBACK REQUIRED: PROPOSED: REQUIRED: PROPOSED: JREQUIRED:1 PROPOSED: HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: I SETBACK NOTES: Approved building plans indicate a 13 feet set back along the southern property line. AC units are shown to be less than three feet from building, so appear to meet setbacks. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED, THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. HIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HISMER "PUTY AND ALL FEES ARE PAID. WIN& M, W . - MMW-11 1110MI �Signature W -111 Print�me Date Released Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. ONLJNE APPLICANT ASSESSOR OTHER STATUS: ISSUED BLD20100006 CONDITIONS • Installer shall provide the manufacturers installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Obtain Electrical Pennit from State Department of Labor & Industries. 425-290-1309 • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction s Res as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction s Res/activities must comply with the noise lirnits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fo this permit. Issuance of this pennit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not litnit in any way the City's ability to enforce any ordinance provision. INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT 11ME LIMIT: SEE ECDC 19.00.005(A)(6) I B UELDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 PUBUC WORKS (425) 1-0235 PRE-TREATMENT (425) 672-5755 RECYCLING (425) 275-4801 _J When calling for an inspection please leave the folloMng information: Pertnit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, andAhether you prefer morning or afternoon. • B-Gas Test/Pipe • 13-Equipment-Mech • B-Fire Stopping • B-Mechanical Final 0 0 Inspection Comments BLD20100006 40 - Mechanical/Solar PERMIT Applied: 01/05/2010 Issued: 01/15/2010 Expires: 07/15/2010 Address: 316 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION COMMENT 1128 - B-Gas Test/Pipe 04/01/2010 lawler CMP Test approved, but missing a couple of nail plates as written in correction. 1130 - B-Equipment-Mech 01/19/2010 steinike INC Pre -Insulation Duct Sealing ok. 04/12/2010 steinike INC Ok For Shafts only will check again for firestopping and relocation of ducts in 2nd f1lor by closet on 4/14. 03/18/2011 LAWLER CIVIP 1141 - B-Fire Stopping 03/18/2011 LAWLER CMP 1156 - B-Mechanical Final 03/18/2011 LAWLER CMP 4/21/2011 2:18:48 PIVI Page 1 of 1 4- OV ED41 CITY OF EDMONDS 121 5T H AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED .10/29/2009 Pennit#: BLD20090222, BUILDING PERMIT Expiration Date: 4/29/2010 Project Address: 316 WALNUT ST, EDMONDS Parce I No: 27032300414400 'PROP rxTY OWI!rx' APPLICA 1. 0CITAWLCTOR MICHEL CONSTRUCTION. OLYMPIC HILLS PLUMBING OLYMPIC HILLS PLUMBING 7907 212TH ST SW # 102 14221 LAKE ROAD 14221 LAKE ROAD DWIGHT MCGREW EDMONDS, WA 98026- LYNNWOOD, WA 98087- LYNNWOOD, WA 98087- (425) 776-2211 Ext. (423) 775-5829 Ext. (425) 775-5829 Ext. LICENSE #: OLYMPHP 1 20B8 EXP:8/4/2011 PERMIT TYPE: Commercial PERMIT GROUP: 47 - Plumbing/Water Service Line/Fountain GRADING: N CYDS: 0 T YP E OF CONST RUCT ION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE N ( 0 X 0 FT.) CODE: OTHER: N ----- - OTHER DESC: IZONE: NUMBER OF STORIES: 0 1 VESTED DATE: NUMBER OF DWELLING UNITS: 0 ILOT #: F-XISTI[NG AREA IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 7B—ASEMENT: PRO POSED AREA 0 1 ST FLOOR: 0 2ND FLOOR: 0 13R.D FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK 0 OTHER: 0 FRONTSETBACK SIDESEMACK REAR S ETBACK REQUIRED: PROPOSED: IREQUIRED: PROPOSED: JREQUIRED� PROPOSED: HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OFTHE LABORCODE OFTHE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. TH!�APPLICA ISNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR H[_WER DEPUTY AND ALL FEESARE PAIP. /0- 2--7---,1 ,oO' ZI 6fariaf-ure- Print Narne Date Kglei s bdZy Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FIN A L INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC I 10/ IRC 110. F--] ARCHIVE APPLICANT ASSESSOR OTHER 0- 0 STATUS: ISSUED BLD20090222 CONDITIONS • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In add it ion to the required press ure/relief valve, an approved listed expansion tanks hall be installed on all hot water tanks. Per UPC 608. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. • Provide combustion air per INIC Chapter 7 for commercial and multi -family residential installations, and IRCChapter 17forone and two-farnily dwellings. • Any request for alternate des ign, modification, variance or other adi-ninistrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply %vith city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound[Noise originating from temporary construction s ites as a result of construction activity are exerript fromthe noise limits of ECC Chapter 5.30 only during the hours of 7:00arn to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must coniply with the noise Iii-nits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold han-rdess the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly firomthe issuance fo this permit. Issuance ofthis perrnit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not lirnit in any way the City's ability to enforce any ordinance provision. INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 FNGESIMING (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 I PUBLIC WORKS (425) 771-0235 1 PRE-TRE4,TMENT (425) 672-5755 1 RFCYCLING (425) 2754801 1 When calling for an inspection please leaw the following information: Permit Number, Job Site Address, Type of Inspection being reauested Contact Name and Phone Number, Date Prefereed, and whether vou Prefer morninL), or afternoon. B-Plumb Ground Work B-Plumb Rough In B-Fire Stopping B-Plumbing Final WALNUT STREET APP�OVED By r--NGlNEi.RlNG 5 .5 'a i R 44 �IGN 5 e ii LF-6" P @ PVC 20 LF-6 .:;�-28 LF-6' PVC 4. OIL 1,4 4 YD 0 Co AILP CO-IE=55.- OCAP CT F^ CO-IE=53.65 L& 60 58 56 iR I L413 RAGE 9. C3 / 'o 1E 1 011, O"IE ---------- dl, S71NG SSCO IE=48. 10 ---------------- - GARAGE SLAB aEVA71ONS- , tGE E X� IE t--4 DRIVEWAY FROIVT=52.JO CEN7ER=51.30 BACk=51.80 4, �D ro 1 5 LF+I- 6" PVC @ 2.07- MIN. CL (6 TYP.) -- (b LA'- 1-b + k,/z 1010 4 22 LF-6' PVC ?0 LF-6" PVC 18 LF-6" PVC 2.0% 3F 30C X, mi--*r\ -,- @ 2. W OUND Ift&I SIDE SEWER DESIGN FOR MICHEL CONS TRUCI TON, INC p 27367 Pol SITE. J16 WALNUT STREET EDMONDS, KA GISTE DA TE. 8-10-09 AL (bl, \0 SCALE.- 17-20' EXPIRES: 11/05/09 0 0 Inspection Comments PERMIT- BLD20090222 47 - Plumbing/Water Service Line/Fountain Applied: 04/21/2009 Issued: 10/29/2009 Expires: 04/29/2010 Address: 316 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION COMMENT 1126 - B-Plumb Rough In 11/12/2009 steinike INC Not Ready. 04/12/2010 STEINKE CMP 1152 - B-Plumbing Final 03/17/2011 STEINKE CMP 4/21/2011 2:17:05 PM Page 1 of 1 of EDAf CITY OF EDMONDS 121 ST H AVENUE NORTH - EDMONDSWA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 g9l) 114! STATUS: ISSUED 3/9/2010 BUILDING PERMIT Expiration Date: 3/9/2 0 11 Pro ect Address: 316 WALNUT ST, EDMONDS Parcel No: 27032300414400 PROPERT1'OWNER APPLICANT COMMkC.UOIR MICHEL CONSTRUCTION PROTECTION & COMMUNICATIONS, PROTECTION & COMMUNICATIONS, INC. 7907 212TH ST SW # 102 INC. 19630 40TH AVE W EDMONDS, WA 98026- 19630 40TH AVE W LYNNWOOD, WA 98036- LYNNWOOD, WA 98036- (425) 776-2211 Ext. (425) 774-9099 Ext. (425) 774-9099 Ext. LICENSE #: PROTECI I 65L8 EXP:5/3112011 JOB DESCRIPTION INSTAUINGNEW ADDRESSABLE FIRE ALARM SYSTEM INNEW CONDOS. VALUATION: $0 PERMIT TYPE: Commercial PERMIT GROUP: 79 - Fire AWPOV,b-�` tj �1 . GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: FIRE ALARM RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2006 OTHER: N ------- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VEST ED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: LXISTING ARE-k IBASFMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 —7BASEMENT: PROPOSED 0 1 ST FLOOR: 0 ARE-% 2ND FLOOR: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR� 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDESETBACK REAR S L-I'BACK REQUIRED: PROPOSED: IREQUIRED: PROPOSED: �QUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O JRFQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL 0 ER DEPUTY AND ALL FE�§ AU PAID. z�,Zlf - 31-711,s // 1)4 3 f Ild re -' Print Name ATTENTION rr IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANT-ED. UBC109/ IBC1 10/ IRC 110. ONLINE APPLICANT ASSESSOR t��fOTIIER 'A STATUS: ISSUED BLD20100114 CONDITIONS • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Cbeck the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for afternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt from the noise limits of ECC Cbapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to BCC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to inderrinify defend and hold harinless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fo this pen -nit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not lirnit in any way the City's ability to enforce any ordinance provision. I INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) I BUffDING (425) 771-0220 EXT. 1333 1 ENGriMUNG (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 _J I PUBLIC WORKS (425) 771-0235 1 PRETREATMENT (425) 672-5755 1 RECYCLJNG (425) 2754801 1 When calling for an inspection please leave the folloAing information: Permit Number, Job Site Address, Type of Inspection being refuipsterl. Irontnet Name and Phone Number. Date Prefereed. and -Abether you prefer morning or afternoon. • F-Fire Alarm System Acceptance • F-Fire Final 0 Inspection Comments BLD20100114 79 - Fire Alarm PE:RM1T;,!­'­ Applied: 02/18/2010 Issued: 03/09/2010 Address: 316 WALNUT ST, EDMONDS .. ...... . .... .... . ....... ID DATE INSPECTOR— ACTION .-COMMENT ............... . 1935 - F-Fire Alarm System Acceptance 03/16/2011 SMITHM CMP APPROVED 1985 - F-Fire Final 03/16/2011 SMITHM CMP APPROVED Expires: 03/09/2011 4/21/2011 2:10:48 PM Page 1 of 1 OV EbAf CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDSWA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 2/1/2010 Permit #: BLD20090859� BUILDING PERMIT Expiration Date: 2/1/2011 Proj ct Address: 316 WALNUT ST9 EDMONDS�: Parcel No: 27032300414400 MICHEL CONSTRUCTION 7907 212TH ST SW # 102 EDMONDS, WA 98026- (425) 776-2211 Ext. ADVANCED FIRE PROTECTION PO BOX 1543 WOODINVILLE, WA 98072- (425) 483-5657 Ext. rNSTALLATION OF A NEW NFPA 13 FIRE SPRrNKLER SYSTEM. VALUATION: $51,750 ADVANCED FIRE PROTECTION PO BOX 1543 WOODINVILLE, WA 98072- (425) 483-5657 Ext. LICENSE#: AQyANWRlq-qB6.,-_ EXP PERMIT TYPE: Commercial PERMIT GROUP: 30 - Fire Sprinkler GRADING: N CYDS: 0 T YP E OF CONST RUCT ION: RETAININGWALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 06 JOTHER: N ------- OTHER DESC: IZONE: INUMBER OF STORIES: 0 1 VESTED DATE: INUMBER OF DWELLING UNITS: 0 ILOT #: EXIS-nN(; ARFX IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 7(BASEMENT: PRO POSED ARFt 0 1 ST FLOOR: 0 2ND FLOOR: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 IREQUIRED: PROPOSED: IREQUIRED: PROPOSED: IREQUIRED: PROPOSED: I 1HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: I SETBACK NOTES: I AGREE T 0 COMP LY W IT H CIT Y AND ST AT E LAW S REGULAT ING CONST RUCT I ON AND IN DOING T HE WORK AUT HORIZED T HEREBY, NO P ERSON WILL BE EMPLOYED IN VIOLAT ION OF T HE LABOR CODE OF T HE ST AT E OF WASHING7 ON RELAT ING T 0 WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27, HI S AP P LICAT ION IS NOT A P E RM IT UNT IL SIGNED BY T HE BUI LDING OFFICIAL OR HLS"ER DEP UT Y AND A LL FEESARE, P AID. D-xl�� A 1*�K NC V�� LVIO "-� / �x -.1 0// r— Signatuq/,-- Print Name Date Released By /Datl4 ATTENTION ITIS UNLAWFUL TO USE OROCCUPY A BUILDING ORSTRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10, ONLINE APPLICANT ASSESSOR �O STATUS: ISSUED BLD20090859 CONDITIONS • Final approval on a project or final occupancy approval must be granted by the Budding Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request foralternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Cbapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, ernployees, and agents from any and all claims for damages of whatever nature, aris ing directly or indirectly from the issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not lirnit in any way the City's ability to enforce any ordinance provision. I INSPECTIONS I THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCT10N ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) I BURDING (425) 771-0220 EXT. 1333 1 ENGINEEMG (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 1 I PUBLIC WORKS (425) 771-0235 1 PRE-TRFATMENT (425) 672-5755 1 PXJCYCUNG (425) 2754801 1 When calling for an inspection please leave the follo-Aing information: Permit Number, Job Site Address, Type of Inspection being reaues ted. Contact Name and Phone Number. Date Prefereed, and vvbether you prefer morning or afternoon. • F-Fire Sprinkler Insulation • F-Fire Sprinkler Pressure Test • F-Fire Sprinkler Acceptance 0 Inspection Comments BLD20090859 30 - Fire Sprinkler PERMIT7-1-1-:�". Applied: 12/14/2009 Issued: 02/01/2010 Address: 316 WALNUT ST, EDMONDS ID DATE INSPECTOR ACTION COMMENT . . ...................... -------- 1915 - F-Fire Sprinkler Insulation 03/16/2011 SMITHM CMP APPROVED 1925 - F-Fire Sprinkler Pressure Test Expires: 02/01/2011 04/07/2010 SMITHM CMP Hydro 200+psi for 2 hrs 11/16/2010 SMITHM CMP Dry System H yd ro, spacing, bracing and head location OK 1930 - F-Fire Sprinkler Acceptance 03/16/2011 SMITHM CMP APPROVED 4/21/2011 2:09:01 PM Page 1 of 1 0 0 Ov ED CITY OF EDMONDS 121 5T H AVENUE NORTH - EDMONDS,WA 98020 I PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 2/13/2009 Pernlit#: BLD20080971, BUILDING PERMIT Expiration Date: 2/13/2010 Proiect Address: 316 WALNUT ST, EDMONDS Parcel No: 27032300414400 PROPERTYOWNER APPLICMIT C011,11-RAC1,11111 R. 316 WALNUT ST CONDOS 316 WALNUT ST CONDOS ADVANCED FIRE PROTECTION 7907 212TH ST SW # 102 7907 212TH ST SW # 102 PO BOX 1546 DWIGHT MCGREW EDMONDS, WA 98026 EDMONDS, WA 98026 WOODINVILLE, WA 98072 425-776-2211 425-483-5857 LICENSE 4: ADVANFP 199136 EXP:5/l/2009 FMCONN=ON VALUATION: $0 PERMIT TYPE: Commercial PERMIT GROUP: 56 - Fire Connection GRADING, N CYDS: 0 TYPE OF CONSTRUCTION: RETAININGWALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: OTHER: N ------- OTHER DESC: IZONE: [NUMBER OF STORIES: o VESTED DATE: [NUMBER OF DWELLING UNITS: 0 LOT #: LXISTINTG ARF�k BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 PROPOSED AIZF-% BASEMENT: 0 1 ST FLOOR: 0 !ND FLOOR: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONT S ETBACK SIDESFFBACK REARSETBACK REQUIRED: PROPOSED: — IREQUIRED: PROPOSED: �j REQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION ' OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIACbR HIS(HER DEPUTY AND ALL FEES ARE PAID. 'f-t' � &17 '; � � la Adl --? //-// C //' e-:z , " 2 -/ � - 0 9 �- �>')// -3� C-/ Signature Date ATI'ENTION TTIS UNLAWFUL TO USE OR OCCUPY A BUfLDfNG OR STRUCTURE UNT7L A FINALINSPECTION HAS BEEN MADE AND APPROVAL ORA CERITFICATEOF OCCUPANCY HAS BEEN GRANTED. UBC109/IBCI 10/1RCI 10. ARCHWE APPLICANT ASSESSOR 1�1-� ' 0 0 STATUS: ISSUED BLD20080971 CONDITIONS • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request foralternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon subrnittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and cons idered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise lirnits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indernnify defend and hold harrnless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance fo this permit. Issuance of this perrrdt shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT. SEE ECDC 19.00.005(A)(6) I BUMDING (425) 771-0220 =. 1333 1 E14GINEEPING (425) 771-0220 EXT. 1326 1 MIX (425) 771-0215 1 I PUBLIC WORKS (425) 71-0235 1 PRETREATNIENT (425) 72-5755 1 RECYCUNG (425) 275 801 1 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being reaues ted. Contact Name and Phone Number. Date Prefereed and whether vou t3refer mornina or afternoon. • E-Cross Connection Final • EEnginecring Final 0 0 Inspection Comments BLD20080971 56 - Fire Connection PERMIT-'�-- — Applied: 11/20/2008 Issued: 02/13/2009 Address: 316 WALNUT ST, EDMONDS I D DATE INSPECTOR . .. ACTION COMMENT ........ 1076 - E-Cross Connection Final 01/28/2011 MCMURPHY CMP signed off 1077 - E-Engineering Final 03/03/2011 LAMBERTJ CMP Final Approved 1908 - F-Fire Connection Thrust Blocking 06/02/2010 SMITHM CMP Approved 1910 - F-Fire Connection Pressure Test 06/02/2010 SMITHM CMP APPROVED 1975 - F-Fire Dept Inspection 06/03/2010 SMITHM CMP APPROVED Expires: 02/13/2010 4/21/2011 2:06:59 PM Page 1 of 1 0 0 CITY OF EDMONDS 121 5th AVENUE NORTH * EDMONDS, WA 98020 0 (425) 771-0220 * FAX (425) 771-0221 www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT April 2, 2013 Cascade Bank Assistant Branch Manager 43 7 Fifth Ave S, Suite 10 1 Edmonds, WA 98020 DAVE EARLING MAYOR Re: Maintenance Bond # 6501008401,Charles Ainsile, 316 Walnut St. Edmonds, WA Dear Sir or Madam: The City of Edmonds hereby authorizes the release of $1,8521.13 from the above referenced account (site maintenance bond). All interested City departments have approved release of this bond amount. Sincerely, Marie arnso Senior Permit Coordinator Cc: Applicant File Incorporated August 11, 1890 Sister City - Hekinan, Japan ah -g/13 MA10ENANCE BOND RELEAO FORM MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE PLEASE SIGN DATE SENT TO: DUE BACK: RECEIVED: PERMIT # ADB# DATE INSPECTED NO 170 )VIIA -C-Wa�� I PROJECT Zt)4i 1z)J44(Z P11A AAAA LA le IfA A2 LAWAl"VI 31 SITE ADDRSS OIL, OWNERS OWNER ADDRESS TYPE OF BOND TO BE RELEASED BOND DATE POSTED BOND EXPIRES Please field inspect at your earliest convenience for the release of the subject bond. If there are outstanding requirements, please note in the space provided. Failure to respond by the noted bond expiration date constitutes Department approval and automatic release of the bond. It is each Department's responsibility to contact the developer/owner when outstanding issue prevent the release of the bond. Please copy the Permit Coordinator on all City correspondence sent regarding this bond. �1%�jIKLND IS APPROVED FOR RELEASE BOND IS NOT APPROVED — OUTSTANDING REQUIREMENTS NOTED 1. 2. 3. WORK TO BE COMPLETED WITHIN DAYS COPY TO FILE SUSPENSE TO COPY TO DEVELOPER CONTRACTOR L:\TEMP\BUILDING\FORMS\Certificate 0ccupancy\bondre1.D0C7/17/2009 A;� MICHEL OFF SITE & ON SITE DEVELOPMENT COST ESTIMATES 12/2/2008 SITE LOCATION: 316 Walnut St UNIT Plan Check# 2008-0031 START DATE: 11/15/2008 COMPLETION DA- 12/15/2009 CONTRACT(MIC , HEL CONST. INC 776-2211 - ROB DESCRIPTION: QUANTIT' UNIT COST TOTAL CONTINGENCY Off Site: CURB - Vertical (Ln. Ft.) 150 $12.00 $1,800.00 $360.00 SIDEWALK & Ram (Ln. Ft.) 15'0 4-S& $26.00 '"60 $806.00 PAVING (Sq. ft) 1,800 $1.20 $2,160.00. $432.00 STORM DRAINAG.6" PVC 7 $8.20 $57.40 $11.48 Sub -Total: aq , 01-11yom 1 ci Sr 1,100-00 $,T,'9b=O $792.00 Contingency, r Total: , 44roe 0#,V. Ev $t*09-48 On-Site: ------------- STORM DRAINAGE 36" ADS 52 $43.00 $2,236.00 $447.20 CATCH BASIN 3 $650.00 $1,950.00 $390.00 4" PVC 237 $11.20 $2,654.40 $530.88 6" PVC 23 $8. 20 $188.60 $37.72 2" PVC Sch 40 36 $12.00 $432.00 $86.40 YARD DRAINS 6 $105.* 00- $630.00 $126.00 Control Structur 1 $84.00 $84.00 $16.80 SEWER 6" PVC �41 10 $8.20 $355.88 -Z-4(o.00 Water Line 4 17 $14.00 $238.00 $47.60 Erosion Control (Ln. Ft.) 180 $4.00 $720.00 $144.00 DCDA Vault & Ass. LS 1 $6,500.00 $6,500.00 $1,300.00 Footing Trench LS 1 $744.00 $744.00 $148.80 Retaining Walls (Ln. Ft.) 0 $0.00 $0.00 Traffic Control Gemesw 1. 42-11 48.80 to -see" $7.20 Trash Enclosure (Ln. Ft.) 40 $14.00 $560.00 $112.00 Sub TOTAL: 18' $18 75 $3,750.48 Contingency 20% $3 Oj48 TOTAL: 502.88 X$28,07 Grand Total: 8 0 6 City Fee: 2.2% $617.59 too/o gato &,A/0..� �# P� 140, 08 0 r lot 691.&0 00 0 <YrAr L_ MICHEL OFF SITE & ON SITE DEVELOPMENT COSTESTIMATES 12/2/2008 SITE LOCATION: 316 walnut st 7 - Unit Plan Check*11 2008-0031 START DATE: 11/15/2008 COMPLETION DA- 12/15/2009 CONTRACT(MICHEL CONST. Inc 776-2211 - ROB DESCRIPTION: QUANTIT' UNIT COST TOTAL CONTINGENCY Off Site: , CURB - Vertical (Ln. Ft.) 150 $12.00 $1,800.00 $360.00 SIDEWALK & Ram (Ln. Ft.) 155 $26.00 $4,030.00 $806.00 PAVING (Sq. ft) 1,800 $1.20 $2,160.00' $432.00 STORM DRAINAG 6" PVC 7 $8.20 $57.40 $11.48 Sub -Total: $3,960.00 $792.00 Contingency $1,609.48 Total: $5,569.48 On -Site: STORM DRAINAGE 36" ADS 52 $43.00 $2,236.00 $447.20 CATCH BASIN 3 $650.00 $1,950-00 $390.00 4" PVC 237 $11.20 $2,654.40 $530.88 6" PVC 23 $8.20 $188.60 $37.72 2" PVC 8ch 40 36 $12.00 $432.00 $86.40 YARD DRAINS 6 $105.00 $630.00 $126.00 Control Structur 1 $84.00 $84.00 $16.80 SEWER 6" PVC 217 $8.20 $1,779.40 $355.88 Water Line 4 17 $14.00 $238.00 $47.60 Erosion Control (Ln. Ft.) 180 $4.00 $720.00 $144.00 DCDA Vault & Ass. LS 1 $6,500.00 $6,500.00. $1,300.00 Footing Trench LS 1 $744.00 $744.00 $148.80 Retaining Walls (Ln. Ft.) 0 $0.00 $0.00 Traffic Control Cones 12 $3.00 $36.00 $7.20 Trash Enclosure (Ln. Ft.) 40 $14.00 $560.00 $112.00 Sub TOTAL: $18,752.40 $3,750.48 Contingency 20% $3,750.48 TOTAL: $22,502.88 Grand Total: $28,072.36 City Fee: 2.2% $617.59 MAR.21.2011 10:42PM 4"n C. I sc)%) 0 CITY OF EDMONDS Date PO Z �m J 7P P. --- i Date Expires Y HAAKENSON MAYOR 121 M AWME NOWH 4 MMOMS. WkW= M 7714M 0 PAX (426) 7714M W0ftwwd.9d=nds.w&u2 DEVELOPMENT SERVICES DEPARTMENT PW*9 6 EU1109 - 94mming MAINTENANCE 110M - F N EM 4PW*�04t-'A& - WN Edmon&/Subdivision/PlattFermitNo. APOP-t)021 Project N=e 7- baprovements Bonded For g(_7,*C KNOW ALL MEN BY TBESE PRESENIS: f, CC�Fo-beveloper/Ombwtor) as Principal, nat we and C A S CA-D E 13AtJ y- (Bank), a corporation orgardwd and existing �a�ndby virtue of the lam of the State of w Surety, are held 6d firmly bound unto the CITY OF EDMONDS, WASM%TQN, in ' the P" susn of 1,4? for the payment of which well and tr* 4 - Mud& Me y bind ourselves, eacb of our heirs, executors, administrators, od anajj�Jem4y =d:ievwW1y,,- by these presents. THE CONDMON OF THE foregoing obligati -op is' -such that the above named principal has r 3& 4yo.4-1re, r ,=plr,ted improvements in the developmw knovig as And the furffier condition that the pfincipal will - maintain all pa amnoved. plans in said developmed fbr a period of not less thgatwent-Y ho—ur M ESMW from the dateof the execution of this bond. Principal and Surety Wier a9m to Promptly reimburse the = OF EDMONDS.for all emergency repairs mWor mefidenance necessaty to F"arve and maintain prublic safety azi welfare of the public. Otha neccpary maintmance da be pm*pned by the Prmpal on rekelpt *f seven (7) days notice ftm ffie CITY OF EDMONDS directing the performance of such work; failing this, the CITY OF EDMONDS win perfim the work at the expense of the Principal and/or Surety� At the end of inaintenwice by the Prblc�, the CITY OF EDMONDS will inspect subject improvements and if in condition nfift4orY to dw CnT OF wmoNDs PLANNI:N6 DivisioNiBuiLDiNG DIVISIONIENGINEERM DIVISION/ FW DEPARTMENT, thm this obligation shall be void', othcr-wifie. to rmain in full force and effect. U) LU a U in the event that any W g It is hereby spoccificAy agreed by and between ft PgrfieB hereto t1latt cc legal action must be taken to enforce the provisions of d& bmd or to coUwt Wd bond, the C= C5 > " �-W prevailing patty shall be entitled to collect its cost and reasonable attorneys'.fms as a part of the W 00 z Iz reasonable cost of securing the obligation hereunder. In the event of settlammt Or rMlAdon 0 UJ = 20 ce- a. 0 these issues, prior to the filing of any suit, the achW costs incurred by the City, including C:J) LU reasonable attorneys' few, shall be recoverable by the prevailing part34 not only from the W judicial CC > proceeds of this bond but also over and above said body as a part of any recovery in any proceeding, in addition to recovery on the bond. Incorporated Augu�t 11, 1890 Q.efow P;+I I . 14altianskri lihMAIN MAR.21.2011a10:43PM NO.379 P. 2 MOW== Bond - From Pap 2 SIGNEDo salad wd delivered this 2-5r'14 - day of MAI-w 20 h CA-5c-ADU 6*tJ V- 777f,.,v,5 11L NAU"F FD"ML INSTr=ON 0=0 5P1PRAqDR SIGNATURE "W- 43-7 5,41Te—jol INSTMMON MAIUNG ADDRESS PEDAte,A05, &J 19 "2-01 Crry/STATFJw MAWGADDMS CnY/STATRW (-qZ6) -7-71,-&51 q ACCEPTED: PHONE CrrY OF EDMONDS G60 I 0o 9,q al ACCOUNTNUMBER, DATB IMAN CIAL OfiTITUTION ACXNg_V=QE-NZNT- STATE OF WASHINGTON ) ) sq. COUNTY OF k4s,�) -1 e- day of , before me, the under -signed, a on this - jtgo& _, 20 Notaxy Public in and fDr the Stjk of WashhVon, digy, oommmoned, and swom -parsoully V�eamd of TITLE 0 FINANCIALINRITEMON TO ME KNOWN TO BE THE the cowation that excouted the f0r0gDiq ingrument, and acknowledged the add histrment to be the fiw end voluntary act and doed of Wd corporation, for the uses and purposas thertin, mentioned, and On oath stgitod that kt- was authorized to oxmute said instrument and that the peg affixed is the corporme sal of said corporation. WMBSS my hand and official seal hereto affixed the day and you above written. fl I A P ZLI Notary Public NOTARY PUBUC in and for the 4tdle ol Washlri6ton I VERNON WOODS. State of W residing at MyA06ointriientlExplies Jon 4. 2012 WA q-8,2pj I BONDMMIDW WSW "/% MAR.21.2011stlO:43PM NO.379 P. 3 �4wzm=90 Pop 3 QMMMLMQMR/CQMMT 0RAQ9QMjLDGM= STAIE OF WASHNGTON COLJNTYOF't��-gk) Sa. l On this day of — 01Wk--.4 20-LI before me, the under -I 4 a mp Notary Public in and for to $t k#IM f W appeam — tu a o ashington, duly conunissimed and sworn, personally ctt46 I Us &:, e, TO NE KNOWN TO BE TIM t)w�� tv4v- of Title CmVm kaTm— cogromadn) dW executed the foregoing mstnmant� and aelmowledged the said i n-arument to be the free and voluntozy ad and deed of said lndhlduak�4�Shiplcorporafion, for the uses and putposes therein mentiow4 and on oath stated that __,W_ was authorized to execute said kstrument and that the seal affixed is the cm-porate seal, of mid corporatioa. WrMEIS my hand and offmW seal hereto affixed the day and ym first above written. Notary PubUc State of Wasm4on NOTAkRY "LIC in and for the VERNONWOODS State of W as=pm� ding at My Appolntnm�fbokes,-Jon 4.2012 DONDMTPF.DOC ROVIRod 09196 /'� C. I Boo 0 6 CITY OF EDMONDS 121 5th AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT April 2, 2013 Cascade Bank Assistant Branch Manager 437 Fifth Ave S, Suite 101 Edmonds, WA 98020 DAVE EARLING MAYOR Re: Maintenance Bond # 6501008336,Charies Ainsile, 316 Walnut St. Edmonds, WA Dear Sir or Madam: The City of Edmonds hereby authorizes the release of $1,851.90 from the above referenced account (landscape maintenance bond). All interested City departments have approved release of this bond amount. Sincerely, !e�Z &a Senior Permit Coordinator Cc: Applicant File Incorporated August 11, 1890 Sister City - Hekinan, Japan MAR.21.2011 10:44PM 0 nV EDAr 4 CFA! & 't co NO. 379 - P. 4 DOW Posted Date Expires Acmunt CitY of Edmonds 121 P Me= Nmlb - Edmonds - WA 9#= . (425) 77 I.M0 pgx (425) 771.022, W"te: wWW-rjjedtnonds,nMg DEVELOPMENT SEPLVICES DEPARTMENT I i Planning -Building - ringmemuig CIZ.FROZI9NEVND-A!QCQ1M 40P�&CAPX Edmonds Building Pminit No. CW�0 Off— 04 ProjoctAddress 21t, LjYd 7' .2 WHEWSI—oc hereinafter re1hrred to as '�dte Principar, has Constructed and installed OWW11 improvements in connection with a projec, known as M&W - T--7-- - — onasitelocawat- . . the City of Edmonds, and WOREAS, in order to provide wourity for the obligation of dw P improvement which proves defective within rigojoj to rephir or replace any -?)—VO year(s) (not to exceed two years) from acceptance of the imptovment by the City of Edmonds herein referred to as "the City, and to enable the City to relem the performance bondtfrozen fund account provided in connection with said improvements, this bond has been secured and is hereby submitted to the City. NOW, THEREFORz, the undersigned Principe and CA-SCAVIF- -6hV Y— --.A R Fiftaricial butitution authorized to transact financial �U'Slnm in the StW Of Washington, herelru&r referred to as "the Institudon", agree and bW themLselves. their heirs, executors, administrators and assigns, unto the City in the sum of' jP rl lawful money of the United Sufts, according to the rbllowing��andd cionditions: 1) The Principal and 1=9tution agree that in the event that any of the improvements ingaLled by the Principal or lutitution purstwt to the above re&Tenced piano, conditions aW file fail to remain fte ftom defiwts in matmials, workmanship or installation or in the can of landscapin& fill to sumve for a period of _JkLjoar(s) from the date of acceptance of the instalWon by the City, the lastitution shall, upon demand of the City and the failure to cure the ddect widdu a reasonable time as determined and specified by the City, remit to the City wift ton (10) days of rcooipt of demand fbr remittance, the amount of this bond or such lesser amount 43 may be specified in the demand. 2) If the Principal fails to cure any defeat within the, time period requested by the City, its employees and agents are hereby authorized to enter onto said property and peribrm said work. This provision shall not be construed as creating an obligation on the part of the City or its representatives. 3) In the event any lawsuit Is instituted by ft City of Edmonds, the Principal or the Witution to enforce the terms of this bond or to debminc the rights of any party hereunder, the prevailing party in such litigation shall be entitled to =over ftom the losing party its costs, including re"onable attorneys' *w, incurred as a result of such lawsuit. RECEIVED r -%Tva4vinT rTr nT?jn%PnR nnr7iA7 MAR 28 20il DEVELJOPMENT SERVICES COUNTER MAR.21.2011 10:44PM NO.379 P. 6 6ty of Edmonds Maintwa:nce Frozen Fund Amount Pago Three DIEVELOPRIVOWNER-ACENMERgUMT brtnershig STATS OF WASHNaToN COUNTY OF 50t On this -2-64— , day of . A before me, the under signed, Reptary Pub ir, in and fOf the State of Woshington, duly commissioned and sworn, personally appeared to me Irnown to be dw lot �&ZjAaa::� the VNE N&I'M emuted the foregoing instruumm, and acknowledged the said instrument to be � r that the free and voluntary act and deed of said partnership, for the useg and purposes therein mentioned, and on oath stated that — - - �1, was authorized to execute said instrument W7NESS my hand and official seal hereto affixed the'day and year fipt #ive written. NOTARY PUBLIC in and for the r State of Wash' n, residing at Notcuy Public Ildle ol Washfh-gtdn VERNQN W000$ POOM FMYAP' lh 9MIXOR63-jan4,2012 r VM% X"m Tir VN0,%r--r(A-7 MAR,21-2011 10:44PM NO.379 P. 5 Chy of %onds Maitnoce, Frozen Fund Account Page TM 4) This ftown fund amount or savings amount "I remain in force and eff oblipdons secured hereby have be= fWly pc&med and until sad ng Oct und, the MPW Of the Institution or the Principal. relea irL writi bY the City at the DATED this 15'r0 day of tvA-V-t-4 2,) L A�/ (ZZ' Fi n De U4 A4#Ff*Z4,q_ 51— i_ Offi qf D 0,,Lo 0%, t./A Print Name 3'7 PP�t-,tvF6. Ulailin Addrcs:Rhone Address - (,5clobq-.33G Account Number Phone Number MNCLA.L R=VTION ACXNOWLEDGMNT STATE OF WASHINGTON ) ) ss. COUNTY OF tit kal ) on this day of, dEvlk I befbre me, the under-sivied, a Notary Public in and for the State of Wwhingt=4 duly commissioned and swop, personaHy appeared I - I UA V-111 -A ':::�P I Afi to rne known to be the �Lj WtA'4&WA/.f UAC"4— the corporation that executed the foregomigomistrument, and acknowledged the said instrument to be the fte and voluntary act and deed of said corporation, for the uses and purp oses therein mentioned, and on oath stated that - —Was authorized to exetcute said instrument and that the seal affixed is the corpotate seW of said corporation. WITNESS my hand and official sal hereto affixed the day NOTARY PUBLIC in and for the Not" Public ,itdto of Washington VERNON WOODS My Appointment Expires Jon'4, 2012 I - __ , . - r%0%0­1Pft State of W110"Pri, residing at -&/w , UJA q b2t) A�& ANCE BOND RELEASAFORM MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: ENGINEERING DIVISION DATE PLEASE SIO A6. PLANNING DIVISION DATE sit PLEASE SIP DATESENTTO: D U E B A C K: — C E I V E D: oe OF Wa! r/A 7271.��� PROJECT �W/ MIND nzwAorm pro Vs., , 0, OWNER ADDRESS TYPE OF BOND TC BOND DATE POST ATE INSPECTED 2— / 2 S— �t —�� Please field inspect at your earliest convenience for the release of the subject bond. If there are outstanding requirements, please note in the space provided. Failure to respond by the noted bond expiration date constitutes Department approval and automatic release of the bond. It is each Department's responsibility to contact the developer/owner when outstanding issue prevent the release of the bond. Please copy the Permit Coordinator on all City correspondence sent regarding this bond. BOND IS APPROVED FOR RELEASE BOND IS NOT APPROVED — OUTSTANDING REQUIREMENTS NOTED 1 . 2. WORK TO BE COMPLETED WITHIN DAYS COPY TO FILE SUSPENSE TO COPY TO DEVELOPER CONTRACTOR L:\TENP\BUILDING\FORMS\Cer-tificate 0ccupancy\bondre1.D0C7/17/2009 010� CITY OF EDMONDS A&I. �M__ 121 5th AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwwdedmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT /17C. jSC)Qj Mar. 30, 11 Builders Financial Services, LLC 23103 100"' AVE W Edmonds, WA 98020 Re: Performance Frozen Fund Account #0000062 for 316 Walnut Street 7 Unit Condo BLD2008-0031 To Whom it May Concern: MIKE COOPER MAYOR The City of Edmonds hereby authorizes the release $12,141.00 from the above referenced Performance Frozen Fund. All interested City departments have approved the release of the Performance Frozen Fund. Sincerely, Theresa mbaugh Permit Coordinator cc: Applicant, Mr. Michel File UTemp/DST's/MasterLetters/Re I ease Performan ce02/0 I Incorporated August 11, 1890 Sister City - Hekinan, Japan Date Posted Date Expires /g/ �K�= Account NumbeV City of Edmonds 121 5h Avenue North - Edmonds - WA 98020 - (425) 771-0220 Fax (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering PERFORMANCE FROZEN FUND Edmonds Building Permit No. ':�Xo OF — 0 0 J Project Address T/ 6 Owner/Developer With reference to the above identified project, this will certify that this Banking Institution has a frozen fund account/savings account (or loan) for the above -referenced developer/owner for the project so identified. In consideration of the permitted development of the property this institution hereby agrees that it will. freeze the sums of money for the indicated site improvements pending written authorization for release of said funds by the City of Edmonds in the atnount of $—ZR? a 0 The total sum indicated will be withheld by this Banking Institution from any disbursements of any kind until written authorization has been received by the institution from the City of Edmonds to release the sum of money indicated by the written authorization from the City. The design, location, materials and other specifications for the indicated site improvements are those required by the City of Edmonds and appear in the above -referenced Edmonds building permit file and are in compliance with the Edmonds Community Development Code of said City. In the event the owner/developer fails to complete the indicated improvements within —e-'5W -weeksfion:t�_ (not to exceed 24 months) the City of Edmonds may demand, and the'institution shall make, payment to the City ofsaid funds so that the improvements can be installed or completed immediately to City standards. The institution shall not be liable to the owner for any disbursement of said funds to the City of Edmonds. It is hereby specifically agreed by and between the parties hereto that in the event that any legal action must be taken to enforce the priovisions of this agreement or to collect said frozen fiind, that the prevailing party shall be entitled to collect its cost and reasonable attorneys' fee§ as a part of the reasonable costs of securing the obligation hereunder. In the event of settlement or resolution of these issues, prior to the filing of any suit, the actual costs incurred by the City, including reasonable attorneys' fees, shall be considered a part of the obligation hereunder secured. Said costs and reasonable legal fees shall be recoverable by the prevailing party, not only from the proceeds of this frozen fund account, but also over and above said body as a part of any recovery in any judicial proceeding, in addition to recovery of the funds. L:\TEMP\BUILDING\FORMS\BONDPerformartr,eFrozen.DOC City of Edmonds Performance Frozen Fund Account Page Three DEVELOPER/OWNER ACKNOWLEDGEMENT STATE OF WASHINGTON ) ) ss. COUNTY OF Joohory�)'Svl) On this 9 4VI —, day of - _Dece-WIOCK 0) W& before me, the under -signed, a Notary Public in and for the State of Washington, duly commissioned and -sworn, personally appeared to me known to be the __ F(es) de'eLr of the general partnership that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said partnership, for the uses and purposes therein mentioned, and on oath stated that was authorized to execute said instrument. WITNESS my hand and official seal hereto affixed the day and year first above written. S10 P4 IJB%�p A 7o os Z' A� OP W A.S\NN NOTARY PUBLIC in and for the State of Washing on, residing at tb C'o V\/\. rA 2--p - to —9 ­01 L:\TEUT\BUELDING\FORMS\BONDPerformanceFrozen.DOC City of Edmonds Performanc4 F .y6zen Fund Account y ' --V Financial Institution Owner/Developer/Principal M_qVX"4V- Officer/Title a3Q-1S [(5z4`2Akt bi Ma4g Addre 9 '3 Q(�,Q bJA Account Number ' o::r /0% Print Name r e7*'l'(- Mailing Address , —Oc-e-ov--4-, r,"*-4c '2 ? C - '02 .4 Telephone Number FINANCIAL INSTITUTION ACKNOWLEDGEMENT STATE OF WASHINGTON) ) ss COUNTY OF Socino)-A)5 On this 941 -dayof DeCe-MOer , c;DOS/ before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and swom, personally appeared PD(Pe(_�_ to me known to be the MeMtOew' the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that hz —was authorized to execute said instrument and that the seal affixed is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year first above written. �';14 EXP/4' .0 0 0 Puw- qz�. Z. NZ, ko jku'tQ� NOTARY PUBLIC in and for the State of Washington, residing at C�V� 9�0 Co "go L:\TEMP\BLTILDING\FORMS\BONDPerfomianceFrozen.DOC INAF.43(8-NE) ro elm, TvP r5oZ3 INV 54.10 Q2" TEJ Em W TnMIM�E w Em'n N1 95 W1 OKAM UD r % . z v - i zu- ISS4 FENCE TO IErlml± V c V c a 61`4 WALNUT STREET Date: E)"TNO &'9rFWCE TO SE rZMOVED I W -.-W -z-W —W -.-W --w OWTV40 6"PtNE w -J F m Be fmmovm I - -.1 '�� � mp=, SiMVALK I 1E (M E"r,TM* TO DE KE TOEA2.00 BLACKFLOW PKEVEWM +I- 3� H1 H CONP. WALL 1Z ul.VED CB-3 TH ------------ EXt6nf* 14MAn -fN I lo DE rm % 2 TO EWT*#Gg WOOD FOXE ALOW, 90UtHNWWEDTeI0ErrDrEtcr OF rAKCEL 0. TO OE KEUOVED ./- 3� HrH CONC� WALL & 3? RAIL FENCE m b1h ME -4 FROM CENTER = BI-' BACK.61.15CP 2� V-WCONC'.WALL rO BE KBMMV )VED AS NOTED ENGINEERINGL / Pml� -to Im ve mmovw EWT1140 10, CHOMY 0 cc KEMMED Tortes" voeocw V —V - 5 64.2Z 'C 655Z CO 60.79 MAX HEIGRT.- 93.25? BA5EMENT: 51W IST FLOM- GOB& ZND FLOOR. 7O-9V 3KV FLOOK: 81.OV W EX15T11*GRADF FKMSCD GRAVE W NTS 2 BE 1.8)0 = 1.8 E =2)5=10 W wTAL REa PM j: 14 r )n comq- 5POT5 Flag 6417--lW296 = 45%. )t k ReqW d I Actual 6417",-14'2-96 IN LOT appr= -57. E-W 4 4r F t Af IMPERVIOUS r t Af EAVES): Sa Ff 5id es w 100 VEWAY.-.!5�55.02 Sa FT. W TOTAL 8.621.87 5Q. FT. RUT 5 to PARCEL A2703-2301041-4400 kf -.r fARCEL B: 270-5-23.9-041-3--W 10 W PARCEL C: 2703-2&)-041-4900. leight 301 TOP OF E)OSTING CAXH 13AS414 ON THE NW MOPM CORNER OF PARCEL A HEEVATtON, 56W 'K* IN MUELLEFZ ON HIM HYDRANT LOCATED AT THE V LAt I Wa INTEK5ECTION OF WALNUT ST. & 39D AVE 5 ON THE NE COKNEF. SMVATION: 503Z > IB64211' 14 . 6315 = AVE CRAVE APPTRVED -BY PLA NNNG ' - / tz.?'ojc� 04SO . ..... Cit JL Y COPY RESUB j 3? RAIL FWX INE Cm.nNG W RHE IL NCV 10' 2008 8%LRNG A%16EIVr C M k-04. ' FW C-0 cm edit, m IF mil, 0,1k IWAA .-V' W-DYA 9- w�� z z W cu 0 u z C) -j .1 1ch z ,a 0 02 — 0!:`12404 tco) C1 w ;It x o Ad & - 21 MICHEL OFF SITE & ON SITE DEVELOPMENT COST ESTIMATES 12/2/2008 SITE LOCATION: 316 Walnut St UNIT Plan Check# 2008-0031 START DATE: 11/15/2008 COMPLETION DA- 12/15/2009 CONTRACT(MICHEL CONST. INc 776-2211 - ROB DESCRIPTION: QUANTIT' UNIT COST TOTAL CONTINGENCY Off Site: CURB - Vertical (Ln. Ft.) 150 $12.00 $1,800.00 $360.00 SIDEWALK & Ram (Ln. Ft.) 150 $26.00 '"M $4-,6ftta $806.00 PAVING (Sq. ft) 1,800 $1.20 $2,160.00 $432.00 STORM DRAINAG 6" PVC Sub 7 $8.20 $57.40 $11.48 -Total: 64r I'LCO-60 M 96"0 $792.00 Contingency, $t,*89�48 Total: 010 1 ow. r)v On-Site: ------------- 10,01- AID Y 100/0 STORM DRAINAGE 36" ADS 52 $43.00 $2,236.00 $447.20 CATCH BASIN 3 $650.00 $1,950.00 $390.00 4" PVC 237 $11.20 $2,654.40 $530.88 6" PVC 23 $8.20 $188.60 $37.72 2" PVC Sch 40 36 $12.00 $432.00 $86.40 YARD DRAINS 6 $105.00 $630.00 $126.00 Control Structur 1 $84.00 $84.00 $16.80 SEWER 6" PVC Water Line 4 Erosion Control (Ln. Ft.) DCDA Vault & Ass. LS Footing Trench LS Retaining Walls (Ln. Ft.) Traffic Control Trash Enclosure (Ln. Ft.) b TOTAL: Contingency TOTAL: Grand Total: ,vtm-4 1,*4700b 17 180 1 1 0 42- 11 40 $8.20 $+-,;?L� $355.88 J4(p.00 $14.00 $238.00 $47.60 $4.00 $720.00 $144.00 $6,500.00 $6,500.00 $1,300.00 $744.00 $744.00 $148.80 $0.00 $0.00 -$Be." $7.20 $14.00 $560.00 $112.00 $18,752,40 $3,750.48 20% N, $3.750.48 $28,07N6 City Fee: 2.2% $617.59 * 11, 36 3 vt to '14 2 0 1 6 Sl - &0 gzak) &ivo_� �01:�140-08 4 3 31 00 0 <Orpf L- T - 10/0 1 to 5WIT f ws r- A -124 . of - , MICHEL OFF SITE & ON SITE DEVELOPMENT COST ESTIMATES 12/2/2008 SITE LOCATION: 316 walnut st 7 - Unit Plan Check42008-0031 START DATE: 11/15/2008 COMPLETION DA- 12/15/2009 CONTRACTf MICHEL CONST. Inc 776-2211 - ROB DESCRIPTION: QUANTITI UNIT COST TOTAL CONTINGENCY Off Site: CURB - Vertical (Ln. Ft.) 150 $12.00 $1,800.00 $360.00 SIDEWALK & Ram (Ln. Ft.) 155 $26.00 $4,030.00 $806.00 PAVING (Sq. ft) 1,800 $1.20 $2,160.00 $432.00 STORM DRAINAG 6" PVC 7 $8.20 $57.40 $11.48 Sub -Total: $3,960.00 $792.00 Contingency $1,609.48 Total: $5,569.48 On -Site: STORM DRAINAGE 36" ADS 52 $43.00 $2,236.00 $447.20 CATCH BASIN 3 $650.00 $1,950.00 $390.00 4" PVC 237 $11.20 $2,654.40 $530.88 6" PVC 23 $8.20, $188.60 $37.72 2" PVC Sch 40 36 $12.00 $432.00 $86.40 YARD DRAINS 6 $105.00 $630.00 $126.00 Control Structur 1 $84.00. $84.00 $16.80 SEWER 6" PVC 217 $8.20 $1,779.40 $355.88 Water Line 4 17 $14.00 $238.00 $47.60 Erosion Control (Ln. Ft.) 180 $4.00 $720.00 $144.00 DCDA Vault & Ass. LS 1 $6,500.00 $6,500.00 $1,300.00 Footing Trench LS 1 $744.00 $744.00 $148.80 Retaining Walls (Ln. Ft.) 0 $0.00 $0.00 Traffic Control Cones 12 $3.00 $36.00 $7.20 Trash Enclosure (Ln. Ft.) 40 $14.00 $560.00 $112.00 Sub TOTAL: $18,752.40 $3,750.48 Contingency 20% $3,750.48 TOTAL: $22,502.88 Grand Total: $28,072.36 City Fee: 2.2% $617.59 TITY COPY RESUIS "V 10 2008 LANDSCAPE CWN COST ESTIMATES' 1 M11/08 SITE LOCATION: 316 Walnut St 7 - UNIT Plan Check# 2008-0031 START DATE: 11/15/08 COMPLETION DATE: 12/15/09 CONTRACTOR: MICHEL CONST. INC 776-2211 -ROB DIESCR10'FION: QUANTrry UNIT COST TOTAL Install Automatic irrigation system'- 5 zones $4,000.00 $4,000.00 Landscaping plants $4,130.00 $4,130.00 Sod $320.00 $320.00 Topsoil 25 $15.00 $375.00 Bark 12 $21.75 $261.00 Labor $3,260.00 $3,260.00 TOTAL: $12,34.6.00 WALNUT STREET Ep BY FNGINE RINIG App -R. qv� 51 5 R 5�565. -j PARKNG.' dA f7 13 LF-6 PVC - @ 16.57. 20 LF-6' PVC Y,— Z=7- 28 LF-6" Pvc c @ 2. 07. 0 CAP CO-IE=53.65 60 56,11 56 --j Q� El/ 7R A 49- MLI co�l ------------ EXIS77NG SSCO IE= 48. 10 --- --------------- - -------------- - - -4' 4- GARAGE SLAB ELEVVIONS. DRI VFWA Y FR01V T=52.30 CEN7ER=51.30 -- - - - - - - - - - BACk=51.80 r PVC @ 2.07- MIN. rn 1 5 LF+1 (6 TYP.) lb lb' Al + 58 - -------------- P 2 221 -6- PVC 18 LF-6" PVC -6" PVC L 2 LF 20 F 920% -.)331E:u Z.ux —N @ 15.1 (r5 WA 04 L-XV I R PIN SIDE SEWER DESIGN FOR MICHEL CONS7RUCITON, INC. 27367 co f 'a, < G ; 05� cp Z-4 C= S17E. 316 WALNUT S7REET, EDMONDS, WA GISTQ� AL DA 7E. 8- 10- 09 SCALE.- 1 "=20' EXPIRES: 1 �105 �O9 Momox City Edmonds Development Services Department Planning Division Phone: 425.771.0220' Fax: :.425.771.0221.. _� this form i- The Critical Areas Checklist contained on s td" be filled out *by any person preparing a Development Permit Application for the City - okEd n or to Mogo pri his/her submittal of the application . '�o the City. The. purpose. of the Checklist is to - enable City sta ' ff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be. easily available. from observations of the site or data available at City Hall (Critical areas inventories; maps, or soil surveys). Date Received: City Receipt #: Critical Areas File #: Critical Areas Checklist Fee:- $135.00 Date Mailed to ADolicant: property o -or his/her authorized representative, wrier, must fill out the,checklist sign and. date it, and submit it t6the Pity. Ibe City will review the checklist makea precursory slie"-Visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signp4,copy of this form to assist City staff in finding and locating'..the specific piece of property described ' on* this form. In addition, the applicant shall . mclude other pertinent information (e.g. site plan, top oigraphy map, etc.) 'or .sbidies mi conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees. to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including r6asonable attorney's fees, arising from any action or infractidil'--based in whole or part upon- false, misleading, inaccurate or, incomplete information fimiished by the applicant his/hei/its agents or employees. Bymy signature, I cerbf�r that the informationand exhi�its herewith submitted are trw and correct to the best of my knowledge and that I am authorized to fil on on the bebalf of the owner as listed below. 0:� �3\wli — — SIGNATURE oF A.PpLicANT/AGENT DA-It- Property Owner's Authorization By my signature, I certify that I have authorized the above Applicant(Agent to apply for the subject land use application, and grant my permissioil.for the public officials and the staff.of the City of Edmonds to enter the subject property forthe purposes of inspection and postin attendant to this li ti SIGNATURE OF OWNER DATE PLEASE PRINT CLEARLY OwnefZ"Joicant. L Name 7 9,,9 7-* 2,_ Street Address I-- d h, " all - city State zip Telephone: Z2 S_ __2 :2 Email address (optional): ApplicantRepresentative: Name ;?'�d 7- 2— Street Address ��dML&� city State zip Telephone: X�ZS_ :2 7(a 2- /Z Email Address (optional): j. #P20 c *769 Critical Areas Che klist cA F'le NO: Site Information (Sofls/topogaphy/ ydrolog /vegetation) 1. ..Site Address/Location: 7 2- Property Tax Account Number.. 70 3 A 3��: oO 41t .3 /_/7 eo 0 3. Approximate Site Size (acres or squarel et')a 6et): _t"�20 4L Is this site currently developed? no. k"yes; If yes; how is'site developed? A, �41�* 5. Describe the general site topography. Check all that apply. Flat less flian 5-feet elevation change. over entire site. R.olling- slopes on site generally less than 157o (a vertical rise of 10-feet over a horizontal t distance of 66-feet). Hilly: slopes present an site of more than 15% and less than 30% (a vertical rise of 10-feet over a -horizontal distance -of 33 to 66-feet). Steep: grades of greater than 30%.present on site (a vertical rise of 10-feet 'over a horizontal distance of less than 33-feet). Other (please describe): 6.. -Site. contains areas of year-round standing water: ;Approx.Depth-- Site -contains areas of seasonal standing water: ;Approx-Depth- What season(s) of the year? 8. Site 1�ih-the f1b.,6 way flobd -of a p! urse. 3 9. Site contains a creek or an area -where tvater flows across the grounds surface? Flows are year-round? Flows are seasonal? (What time of year? io. Site is primarily:.. forested, meadow ;shrubs mixed urban.landscaped (lawn, shrubs etc) 11. Obvioxi�s �Ve�aAd`ls on site: Use Only For City Staff I. Plan Check Number, if applicable? 2. Site is Zoned? 9. M, Z, -t 3. SCS mapped soil type(s)? - 2-'7 1164 04- W�, 0 -k'& f4p�r 5 - 41 At, �—A , W-b.1, I t�,,r 7, 4, V� 4. Critical Areas inventory or CIA. map indicates Critical Area on site? No C 5. . Site within designated earth subsidence landsli& hazard area? tj.. DKUAhgNATI0N STUD YREQUIRED Reviewed b3r. Date: /0& Critical Areas Chc.cidist/3-2-5.2004 UA PLANNING DATA 0." 1 STREET-- - - New Commercial I Multi -Family Projects Na Date: A Site Address: oict Plan Check BLD - Project Description: Use(s) Proposed: S(C&,Lf(��J Allowed Use: ()V I NO) CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES 14* Reduced Site Plan Provided: �E) NO) Zoning: �em Map Page: Comp Plan Designation: /41L/1�( FC4/4( Corner Lot: QED)NO) Flag Lot: (YES A D 6 F i I e N u m b e r (4atE-w—a—f We-d): AP6 - (96 — Iq Lot Area: q6 Lb / I/ Plans Match ADB Approved ?_ V1 NO) Shoreline Required: (YES AEO Critical Areas Determination fl.- (,4+Z_o06o0&9 El Study Required V�Waiver SEPA Determination: NVExempt 7 IN e -7 500 ctb, 7 � VQ Needed (for sites with c yards W-gradding or w�th-Z1402feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form)- 9equired.Setbacks Stree1V Side. Adlual. Setbacks Street.- S— Side: Side: / ?_ A, Lot Coverage/F-AR Required: Lot Coverage/FAR Pr-evided! Lot Coverage/FAR-Galeu4ations: ...Building Height Datum Point: 4M %kw�_ Datum Elevation:-,� Maximum Height: Actual Height: 71i� roo _r Subdivision: Lot Aggregation Required: "in _)9-e Landscaping Matches ADB Approved: h 6 ok c, (vc4d /a - L I andscaping Bid Provided.- (YES No Bond Amount (100% Bid): Plan Review By: ut I o,A PLANNING DATA New Commercial I Multi -Family Projects Commercial Aarking A ��lj Business Name Type/Use Parking Tenant F R I Ratio Area Total Parking Required -- Total Parking Pi-ovided-- Multi-Family Pa rking Am� # Bedrooms per Dwelling Unit Parking Ratio 9 Units Required Parking Studio 1.21D.U_ I Bedroom 1.51D.U. -2- 2 Bedrooms 1.8/D.U- 3 + Bedroomsjf_,�r 2.0/D.U_ 5 Total Parking Required. Total Parking Provided. 060r, cc, �rak 0 1,'101nCrKt:2.C> ,4� X61. I L 2,5 1 C -6s� , 51. Z. �A At C9 �) ( � J� OA vilckfnf�4� �Z_ -7 (CVIJSC��e_ 61V q-'7-,7 z Iq 6�. -so 5) e0CL)t- Cl'�ROJ OP' �ItA nu _C9 60- 7'� Plan Review By: o iv%.A-v- or e/tvicld- FRIECEIVED JAN 1-8,2008 Dennis M.- Bruce, 'P.E. BUILDING DEPARTMENT CITY OF EDMONDS M.S.C.E., M.B.A. Geotechnical /Civil Engineer January 15, 200 r, t i FILE fmSm"a City of Edmonds - c/o Michel Construction 7907 2121h St. SW, # 102 Edmonds, WA 98026 � Subject: Geotechnical Evaluation — Foundation / Shoring Recommendations Proposed 7-Unit Building 316 Walnut St., Edmonds, Washington This engineering report presents the results of a geotechnical evaluation of the Michel Construction property at 316 Walnut St., Edmonds, Washington. This evaluation was required by City of Edmonds Building Department. REFERENCES: " Project Plans by McGrew Michel Building Design dated November 5, 2007 Site photographs BACKGROUND: The overall property at 316 Walnut St., Edmonds, Washington is rectangular in shape (approximately 130 feet by 110 feet). See plans. The overall site is gently sloped with no significant geotechnical features. The existing building, driveways, concrete fences, etc. are to be removed in conjunction with the proposed development for a 3-story building (with underground garage) as indicated on the site plan. . Visual evaluation of the overall property reveals no evidence of any geotechnical distress: no slides, no soil tension cracks or any evidence of erosional degradation. EVALUATION: In order to augment the existing site geotechnical information, 4 soil test holes were hand dug by this engineer on December 119,2007. All 4 test holes revealed similar sub -grade conditions, namely: SOILS - FOUNDATIONS - 81TE DEVELOPMENT - INSPECTION - DRAINAGE DESIGN& PERMIT - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 City of Edmonds 0. C/o Michel Construction, Inc. January 15, 2008 Page 2 0" to 611 6" to 38" (bottom of test holes) 0 Organics, roots, and organic silt Dense native sands No groundwater was encountered in any of the 4 test holes. All test hole walls remained vertical and stable. No sloughing or caving occurred. NOTE: This engineer has performed many soil investigations and follow-up inspections, in the vicinity of this site and verifies dense, native, sub -grade soils allowing for normal / standard reinforced concrete footings. CONCLUSIONS I RECOMMENDATIONS: Based on the findings of this investigabon, and experience with similar sites in the area, the Michel property at 316 Walnut St., Edmonds, Washington is -gootechnically approved for the proposed 7-unit building, subject to the following: Temporary shoring: The proposed excavation cuts of up to 9 feet may be uopen cuf within the property if the 'soil cuts are sloped at 1: 1 (temporary declination). This.engineer's experience recommends temporary Eco-Block shoring to allow - for a "cleaner" excavation and foundation zone during construction (see attached temporary Eco-Block shoring design). Standard reinforced continuous and spread footings. Allowable bearing pressure: -3,000 p.91 Equivalent fluid'pressure of 35 p.c.f. is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. For retaining wal-I.design, use friction factor of 0.55 and passive pressure of 350 p.c.f. Geotechnical inspections by this engineer prior to any foundation concrete placement. The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structunal Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have minimum widths of eighteen (18) and twenty-fbur�(24) inches, respectively, and should be b o--ftomed at least eighteen (18) inches below the lower adjacent finish ground surface. City of Edmonds c/o Michel Construction,, Inc. January 15, 2008 Page 3 Depending on the final site grades, some over -excavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the -'over excavated hole, the width of the over -excavation at the bottom must be at least as wide as the'sum of two times the depth of the over -excavation and the footing width. For example, an over -excavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of three thousand (3,000) pounds per square foot (p.s.f.). A one-Ahird increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria it is anticipated that total post-construction'settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in thickness) Will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the * vertical, embedded portions of the foundations. For the latter condifion, the foundations must either be poured directly against undisturbed soil or the backfill pl . aced around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral, loading: Paramete Coefficient of Friction Passive Earth Pressure Where: Design Value 0.55 350 p.c.f. P.O. is pounds per cubic foot. (2). Passive earth pressure i& computed using the equivalent fluid density. We recommend that a safety factor of at least 1.5 be used for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE,: Slab -on -grade floors may be supported on undisturbed, competent native soils or on structural fill. The slabs may be ' supported on the existing soils provided these soils can be re -compacted prior to placement of thelree-draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We City of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 4. - - also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inche's for sealing purposes. PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following. recommended design parameters are for walls less than twelve (12) feet in height, which restrain level backfill: Parameter . Desi-qn Value Active Earth Pressure* 35 p.c.f. Passive Earth Pressure 350 p.c.f. Coefficient of Friction 0.55 Soil Unit Weight 125 p.c.f. Where: (1) p.c-fAs pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which, cannot deflect at. least 0.002 times the wall height, a uniform. lateral pressure of one hundred,(100'p.s.f. should be added to the active equivalent fluid pressure).. The values given above are to be used fordesign of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above. design values do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will need .to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement City of Edmonds c/o Mi6hel Construction, Inc. January 15, 2008 Page 5 and compaction of retaining wall backfill should be accomplished with hand -operated equipment. Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent sift or clay particles and have no particles greater than four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high sift content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. The purpose of these backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled General Earthwork and Str6ctural Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. EXCAVATION AND -SLOPES: As stated, the excavation for the garage level may be undertaken at a 1: 1 temporary cut. Experience recommends that temporary Eco-Block shoring be utilized to minimize excavated material and result in a "clean" foundation zone during construction (see attached Eco-Block shoring design). In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a height of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a height greater than four (4) feet, the cut should have an inclination no steeper than 1:1 (Horizontal:Verfical) from the top of,the,slope to the bottom of the excavation. Under specific recommendations by the geotechnical engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 2H: IV. It is important to note that sands do cave suddenly; and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of -soil. City of Edmonds clo Michel Construction, Inc. January 15, 2008 Page 6 DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch -minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. All roof and surface water drains, must be kept separate from the foundation drain system. No groundwater was observed in any of the 4 test holes during the fieldwork. Seepage into the planned excavation is possible, and likely if excavation occurs during winter months, and if encountered should be drained away from the site by use of drainage ditches, perforated pipe, French drains, or by pumping from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation of the site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. GENERAL EARTHWORK AND STRUCTURAL FILL: The proposed building and pavement areas should be stripped and cleared of all surface vegetation, all.organic matter, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. . Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and, after excavation prior to placement of any structural fill. . All structural fill should be placed in horizontal lifts with a moisture content at or near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction. process. The allowable thickness of the fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the City of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 7 lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: Location of Fill Placement Beneath footings, slabs or walkways Behind retaining walls Beneath pavements Minimum Relative Compaction 95% 90% 95% for upper 12 inches of Sub -grade, 90% below that level Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1557-78 (Modified Proctor). Use of on -Site Soils If grading activities take place during wet weather, or when the sandy, on -site soils are very wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally sandy and thus are not highly moisture sensitive. Grading operations will be difficult when the moisture content of these soils greatly exceeds the optimum moisture content. Moisture sensitive soils Will also -be susceptible to excessive softening and pumping" from construction equipment traffic when the moisture content is gre6terthan the optimum moisture content. Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5)r, percent silt or clay particles. The percentage of particles passing the No. 200 sieve.should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic. materials are segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: No drainage problems were evident with the existing building and overall property at 316 Walnut St. It is understood that the new 7-unit building will comply with City of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 8 City of Edmonds requirements for gutters, downspouts and storm water control tight lines into the existing City of Edmonds storm water system. CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. TEMPORARY ECO-BLOCK SHORING: As previously mentioned, it is a contractor choice to open cut the excavation at no steeper than 1: 1 declination. However, practical experience strongly recommends the use of temporary Eco- Block shoring to minimize removal of excavated material and result in a "clean" foundation zone during construction (see attached Eco-Block shoring design). INSPECTIONS: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer *during construction: 0 Soil cuts • Foundation sub -grade verification • Temporary Eco-Block shoring, if required • Any retaining wall, or rockery placement • Any fill placement • Subsurface drainage installation • Temporary and permanent erosion control measures SUMMARY: The proposed Michel Construction 7-unit building at 316 Walnut St., Edmonds, Washington is geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspections during construction. . CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and practice. No other warranty, either express or implied, is made. The conclusions are based on the results City of Edmonds c/o Michel Construction, Inc. January 15, 2008 Page 9 of the field exploration and -interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different .than those described in this report, this engineer should be notified to observe the situation and review and verify or modify the recommendations. If there are anyquestions, do not hesitate to call. IOU ME DMB:abj Dennis M. Bruce, P.E. Geotechnical / Civil Engineer A62" a 494.2z WAilNUr STREET C 655Z 0 60,75' 14 - 63.30 - AVE GRAVE MAX KEIGfff: $329 BASEMENT: 51W IST FLOM- 650h& 2ND FLOOK. 70�W E)2DTWGW5rWllCE H MARK It 'ED PE KEMOVEP 50 FLOOR: SIOW w w _.-W --_w _.-W _._w ­ .-W —W _._w w ___w W ---- E)osnNG GKA"O'E' PROPOSED GMADE 410 02" 69Da w PARKING FOUREMENM 4,08 WSW) TJ3JL-- ..11jo -E)affT?*WCEVAr, N SWEWAL" C*). Y TO 0 REWOVEP (1) 2 BED . th)a - 1,13 fm 3 BED . w . 10 TOT)kL RUL . 14 SPOTS ACTUAL . $4 SFOtS j6o.4o'N8q044:WE W LOTCOVERAGEt TO. 6075GA4,2�*,02-45%. LOT SLOPE! 0 p 8LA.CKFLCW--N, .5TU* HOME Mixv 7% E-W TO VE K I FrEVENTOP. LO TODErZACIVEP BUILDING (+ EAVES); 6,W/5.06 SQ FE DRIVEWAY: 875.02 M FT. Q151-4P 07 . . . . . . . . RATIO. M.77 Sa FT w TCUL: 6,021,87 Sa Fr. .. .. .. ......... .. . =.. llARCLL To IA4" FARM 5:2703-230-041-3WO 3P HP PARCEL C. 2703,-230-04(-4900. w WALL TO 3E p M-3 ly I-L 7,00' SITE BENCHMARIC ... WITH - in ...... . I TOP OF E)(ISnNG CATCH BASIN ON YH ;l r B . ...... h CMEK OF PARCEL A ELEVAnCO W, VERTWAL -IN! TO DE KEI (MB Ir IN KOLLER ON FIRE HYDRANT LO -MK3%YLAI W INlERSEcnoN OF WALNUT ST. & 5KD 2 4 NE COKNEF_ ELEVATION: 50.7Z GrAPE FLANE AVERAGE FER IW % ol%- C 30 til /4 - 6335 - AVE GFAVE F�wm IE4 w xal 7� /- V HIGH CONC. TO f E f Emo�w WALL&3'RAILFENCE Rsmovsp _ TI 13 VEWAY— - ----------- q TOKEIAO VV­ ........ . .. . ..... . ..... . ­_ 11 WE w *41% AITP PROPO BIHI ARAGESLA& DRIVEWAY FRON a CENTER - 51.3( WK. 51.80' x ------ -r(O A/ V_W CONC. WALL -to TO BE REMONED p Tabs" 7r 7V .............. I �. - 32 1- : A zij -- - _-W I I =7v �' � I TWO ol . ..... . .... ------ ...... ------ --------- ------- -E)(151114 31 RAIL . ..... SOB PLOT/ P-2 . ........... ..... . W Imm w 130-00 N 89044'14" E I EWTUO WPOIC 10 \_ VOST"r, l(T CHEMY w ft KEMOVED BUILOING 08 N SITE/ �10?.062W orrya%Er.)P4RTM T081644W MON8V SCALE: i" - 2o-o 71 CA FILE NO. c1q Z99 46itical Areas Checklist* ------------------------------------------------------- Site Information (soils/topography/hydrolog,,y/vegetation) ��-Mwry % A 40, *01/ 40 1 . Site Address/Location: 2. Property Tax Account Number: �.3_27_a3 3. Approximate Site Size (acres or square feet): 33 0 0 4. Is this site currently developed? X yes; no. If yes; how is site developed? �21ne &( . ore-k,4 /c, )Ce-3 LC "e-p- 5. Describe the general site topography. Reck all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of I 0-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of I 0-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ; Approx. Depth: _ 7. Site contains areas of seasonal standing water: IZc2 Approx. Depth: What season(s) of the year? 8. Site is in the floodway /-7cf_-> floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flo . ws are year- round? Flows are seasonal9 (What time of year? 10. Site is primarily: forested ; meadow shrubs mixed K-69�an �scae �n,shrubs etc) 11. Obvious wetland is present on site: e�> ------------------------------------------------------ For City Staff Use Only ---------------------- I. , site 'is Zoned? DETERMINATION Aca_chk.doc; Rev 10103/97 City of Edmonds CRITICAL AREAS CHECKLIST The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City. of Edmonds prior to his/her submittal of a development permit to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, 'or may be, present on the sub ect property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map along with the signed copy of this form to assist City staff in finding and locating the specific, piece of property described on this form. In addition, the applicant shall include other pertinent infor m-ation (e.g., site plan, topography map, etc.) or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site I have completed the attached Critical Areas Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner/Applicant: Bkla�a Name s ') 'Y Street Address e� aw ncL Yi city State. Zip L/a5- �? 2& -) (00 G Telephon Signature &=12 -.9 �! Date Applicant Representative: Name Street Address City State Zip Telephone Signature Date c:reccption\jana\cac1.doc (over) ()Q� November 23, 1999 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA M020 - (425) 771-0220 - FAX.(425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering I Brian Bums 318 Walnut St. Edmonds, WA 98020 Subject: Determination regarding Critical Areas Checklist # 99-299 BARBARA FAHEY MAYOR Dear Applicant: Enclosed please find a copy of the Critical Areas Checklist you submitted. The "DETERMINATION" reached by the City is located on the reverse side of the form (bottom of page). It is very important for you to retain a copy of this Critical Areas Checklist "DETERMINATION" for your records. IMPORTANT INFORMATION TO BE NOTED: PLEASE EXAMINE THIS" DETERMINATION" FOR ADDITIONAL REQUIREMENTS. YOU MAY NEED TO SUBMIT ADDITIONAL INFORMATION SUCH AS AN ENVIRONMENTAL CHECKLIS OR CRITICAL AREAS STUDY, The -DETERMINATION' for the Critical Areas Checklist you submitted is a site -specific determination not a project -specific determination. You mus t submit a copy of the CRITICAL AREAS CHECKLIST and DETERMINATION MTH ALL 40 PERMIT APPLICATIONS or YOUR APPLICATION WILL NOT BE PROCESSED. Permit applications include the following: Building Permits Conditional Use Permits Subdivisions Variances Applications to the ADB* Land Use Applications Any other development permit applications. Enc: Critical Areas Determination * Architectural Design Board C:ReceptionUana\CRLTR.d0c Thank you. Sharla Graham Planning Secretary Incorporated August 11, 1890 Sister City - Hekinan, Japan 0 3) F m vt& S�.- ctrtp of DEPARTM At: 316 Walnut Street Occupancy established by this .-certific R2/S2 e (1b 011b ENT OF BUILDINGS kilt International Building Cod Section I '�Q BLD2008-0031 —Buildina-Permit Dwelling Units: **7** No. Stories: 4 Ty piRZonstruction: VA Basement: No d er Maxirnum'�06cu�ant -oa.,- (P IBC 1004) --remain Roohi,&bpacitj-sigii�,'_Whe'n req,-uhred" t Oosted at a'filimes. A --S -#102: Edmohds, WA 98026 r 07r2lit' t�SW. Building Owner: Michel Construction OW It P CdMP'L, -REQUIREMENTS OF THE 2006 THE Michel 7 Unit Condo HAS.-,�BEEN'*�INS'P,.E'Clkp�l�ND A RROVED!,AS,� �YIN6 WITH THE EDITION OF THE INTERNATIONAL 951—LDINGCODE AS ADO D BY-THEi'CITY,FOR'THE-GROURIAND DIVISION OF OCCUPANCY AND THE USE I �� � 11 FOR WHICH THE PROPOSED OCCUPANCY IS CLASSI FIED. s th Issued this 18 da ICIAL BY: — This certificate shall be posted in a conspicuous public area and shall not be removed, mutilated or ition at all times. Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. I.E.B. 111. 2 0 0 9 A : 3 1 PM NO. 450 P. 4 "#Jlw U11SIGN & ENGINEERIN01 INC. 11006 60"' Ave West structural Analysis Mukjlt96 WA 98275 Structural Design (425) 143-1117— [,lx (425) 493-83"B's Design Services July 3, 2008 References: 316 Walnu% Edmond I s Washington House BiU 1848 Upon review design drawings and documents Provided by the architect, I find that these sAtisfy the reqUireMonts qf S 'ection$ I throiggh 19 of the ,4bove Mff 1848). House sin An independent inspector shall verifY compliance of said documents and provide rePOrt(s) to the building department, architect, developer and to our office. Alex K Moroseos, PE, SE 100 STREET FILE RESUB FEB 12 2009 Wz��� &%To%;: -ET FILE Crff OF EDMONDS RECEIVED TRAFFIC IMPACT ANALYSIS JAN 18 2008 BUILDING DEPARTMENT WORK SHEET CIT)f OF EDMONDS Name of Proposed Project: - Owner/Apoficant: � Name svg StreeMailing Address E-T) City State zip Telephone: 2ZI � Applicant Contact Person: 601T Sct4LUIA �,EVL, Na= 90 SNAG Streetimailing Address city state zip Telephone: Traffic: Engineer who prepared the Traffic Impact Analysis: Firm Name I. PROJECT DESCRIPTION a. Street address Qfknown):. Ve Contact Name 15T b. Location: [All r c. Specify existing land use: Telephone (Attach a vicinity map and'siteplan.) d. Specify proposed type and size of development: —+ 1yo V"r kk V e. When will the project begin construction and when will it be completed.? 56AsAw— 2mli� f Define proposed access locations: AwtLf GFT- OF t1AAL-WVr g. . Define proposed sight distance at site egress locations: 7(%) 3co 1 Ll TRIEP GENERATION a- Ex'sfing Site Trip Generation Table: Land Use (Af b. Proposed Project Trip Generation Table: Daily (ADT) Land Use. Daily (ADT) Lt V's %-r c. Net New Project Trip Generation Table: PM, Peak-Hmr -Trips IN _ OUT. 2.13 _2 -5 PM Peak -Hour Trips IN OUT w"', d. State assumptions and methodolo y for internal, link -diverted or passby trips: .9 f�-Y�ears A�fter �Oeni�nLo&- With Project: Without Project: Note any assumptions/variations to standard analysis default values and justifications: 7. WTIGATION RECOM3UNDATIONS State recommended measures and fees required to mitigate Project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as id ti ' in ECDC 18-82.120, except as otherwise pr' en fi ed ovided for independent fee calculations in ECDC 18.82.130. 6ZMiri72=�TIt , Zpf r:p— DWO !L SAI 14. 7- (040--,Z) ,0 1W 1ZW 'AT T 544,49/Mi-T 4 A. 1-7 Xt Drainage Report for Walnut Street Condos 3'Diameter Detention Pipe Date Prepared: Prepared for: Site Address: Z(f 00 4 Is May 2, 2008 Michel Construction, Inc. 7907 212th ST SW Edmonds, WA 98026 (425) 776-2211 316 Walnut Street Edmonds, INA APPROVED AS NOTED BY ENGINEERING RESUB L A T- I K r-,.-): 1 1 11 yj'Lv� JUL 10 2008 m&w&mwvSTREET FILE MICHEL CONSTRUCTION, INC. 316 WALNUT STREET CONDOMINIUM DEVELOPMENT 5-2-08 OVERVIEW: A condominium complex is proposed for the property located at 316 Walnut Street, Edmonds, WA. The site slopes downward from the eastern to the western sides of the site from approximately 4.5% to 7.5%. A total impervious area, (rooftop, concrete walkways, and driving surface) used for calculating the on -site detention system is 7,687 sf. DETENTION SYSTEM: The site area is 14,294 square feet. The site is less than one acre in size and. is within the Shell Creek Drainage Basin. The storm water detention system is designed in accordance with the SCS method and the ECDC 18.30.060.A.1l.a for the 2, 10, and 100- year 24-hour storm events. The release structure is designed to release flows for the three storms events at the calculated pre -developed peak flows for the corresponding 2, 10, and 100-yr, 24-hour design storms. A chart of the pre -developed, post -developed, and controlled flows is shown below: DESCRIPTION PRE -DEVELOPED FLOWS DEVELOPED FLOWS CONTROLLED RELEASE DEV FLOWS 2-YR, 24-HR 0.02 cfs 0.07 cfs 0.02 cfs I 0-YR, 24-HR 0.05 cfs 0.10 cfs 0.05 cfs I 00-YR, 24-HR 0. 11 cfs 0.17 cfs 0. 11 cfs The detention system consists 52 LF-3' diameter pipe coupled together with the storage in two Type I -L catch basins. Per the Soil Conservation Service Soil Survey of Snohomish County, the soil for the above referenced site is listed as Alderwood Urban Land Complex and Kitsap Silt Loam. Alderwood and Kitsap soil types are listed as Hydrologic Soil Group "C" per Table 111-1.6 of the 1992 Stormwater Management Manual for the Puget Sound Basin. Soil Map -Snohomish County Area, Washington (Michel Walnut Street Condo's) -4bZ4U �oqbJJU Z)4b4ZU 54b!) I U 5466UU 545690 546780 546870 Edmond A LZ.J Wit 4.7 fir ix:7 4 r 'LL j 046 Ilk LL JI A 104 Iry ' W, 'ijp' I*W :'ISITE A ,07 7r 546240 541 546420 546510 546600 546690 546780 51,470 N -Meters 0 50 100 200 300 .aFeet A .0 200 400 800 1,200 USDA Natural Resources Web Soil Survey 2.0 aW conservation service National Cooperative Soil Survey 12/11/2007 Page 1 of 3 0 0 0 SYMBOL N A M1,E I Ahlenwod gravelly sandy lost". 2 to a percent slopes 2 Atcletwood gravelly saintly loom, 8 to,16 percent slope$ 3 Alderwood gravelly sandy loam, IS tq.25 percent slopes 4 Aldorwood�Evarettqrovolly sandy loamt;, 26 to 70 patient slopes 6 Aldirwood-Urban 1" complex. 2 to II pereq,til slopes 6 Alderwood-Utban land complex, 0 to 15 percent slope$ 7 arsillowlefyi silty clay loam 8 BelOngham Variant mucky silty clay.loom, 9 Cathcart loam, 3 lot S percent $top" 10 Cathcart loam. IS to 26 percept slopes I I Callicatt too ' m ' 2S to SO percent slopes 12 Cty0hermists, nearly level 13 CuIxel fine sandy loam 14 E"It sill a (*am, 3 to 30 percent slopes Is Eivnil-djopterun t c*nV!ex,.l S�to 30 percent slopes 16 Efirpolt-Olonsouni-Rock outcrop complex. 30 to 60 percent slopes I I Everett gravvily sandy:laarn, 0 to 8 percent slopes is Everett firwelly sently, loam, 8 to IS percent %topaz 19 Everett gravelly sandy loam. IS to 25 percent slopes 20 Fluvowents, tidal 21 Golchell silt loam, 3 to 30 percent slopes 22 Gotchell�Oso consplex, �S to 30 percent st"s 23 Getchall-0so-Flock outcrop complex, 30 to 65 percent slopes 24 Greepwaror loomy tend 25 Harinit-Potchub-flock outcrop comlotox, 65to 90 percent slopes 26 Indianola toamy send, 16 to 2S percent slopes pmswr� 21 Kitsop silt loam 6 to 8 percent slopes 28 Kitsap silt loam, 8 to 25 portent slopes 29 Xilsop silt loam, 26 to 50 percent slopes 30 Lynnymod $oomy $and. 0 to,3 percent slopes 31 LVnnvwqod-Norgsr consplets,165 to go percent slopes 32 McKenna gravelly silt loam. 0 to'$ powAnt'slopet 33 Menzel ditJoarn. Q to 3 percent slopes 34 Mukilsee, inuck 36 Notgar fine sandy loom, 0 to 15 percent slopes 36 NorW fine sandy fisam� 15 to 30 patient slopes 37 Nargar-Lynnwood coxhirlex, 30 to 6S percent slopes is Natgw Variant sandy town, 3 to 30 percent slopes 39 Neff"is loom 46 Norms Variant loom '41 OgartV.Tolotsl -Rock outcrop complex, 65 to 96 percent slopes 42 otorrownt gravelly loam. 3 to Is percent slopes I , 43 Olamoun t-Elwat I -Rock outcrop complex. 66 to 90 percent slopes 44 orcas peat 45 Oso gravelly loom; 3 to I S,parcons, stopes 46 040-Gatchell-Rock puttreip',complex, 6S to 90 percent slopes 47 Poilik silt loam, 0 to 8 percent slopes - 48 Pastik silt loom, 8 to 26 portent slopes, 49 Postik silt loom, 25 to 60 percent.slopes so I'llchuck losmy send 61 Pit$ 62 Potchub silt loam . 3 1* 30 patient slopes 53 Potchub-HarmIt consplex. IS to 30 percept stop- 54 Polch.b�Hartpl;- Flock outcrop complex, 30 to 66 percent slope s 55 Puget silty clay learn 56 Puyallup fine sandy loom 57 Regnar fine sandy loam. 0 to 8 percent slopes 1511 Rognor fine.sandy loam. 8 to 15 portent slopes 69 Riv*rvash 60 Robe( silt loom, 0 to 06 percent slopes 63 Robot slit loom. 15 to 30 percent slopes 62 Robot silt loom, 30 to 65 percept slopes �63 Skykomlsh gravelly loom, 0 to 30 percent slopes .64, Snohomish slit loam 65 sulsever orwelly loam, 0 to 8 percent slopes 66 Sultan sal(loam, 67 Sultan vatiant slit town 68 Sum", silt loam 69 Torric Mocilsoprists, neatly,levol 70 Tokut silt loom. 2 to 8 percent slopes 71 Tokul W t loam, 0 to 16 percent slopes 72 Tokul gravelly loom. 0 to 6 percent slopes 73 Takul gr"ty loom'. a to I S percent slopes 74 Tokut gravelly loom, 15 to 25 petcont slopes 76 Tokul-ClIfuty-Flock outcrop complex, 0 to 2S percept slopes 76 Terkul-02orty4jock outcrop complex, 25 to,65 percent slopes 77 Tokul-Winston gravelly loams, 25 to,65 percent slopes JS Us ban land 79 Vadoi mucky silt loam, 3 so 25 parve nt slopes so Winston gravelly loam, Itto:3 percent slopes 8 ' I Winston gravelly loam. 3 to 30 percent slopes 82 x0rarthents. nearly, level 9 0 Table 2.2 Hydrologic Soil Series for.Selected Soils in Washl gton State . Soil Type — Hydrol2gic Soil Grou p soill�ype Hydrologic Soil Group Ague w . C 14oko C Ahl H I loodsporl C Aits C Hoogdal C -7Td—emmd Tjoypus A r Arents, (CM100 'voo lluel A Arenis, Everett B Indianola- A Ashoc7 B Jonas Boldhill 13 junipc B Barneston C Cn K.11alocl) C Baunigard Kapowsin C /D Beausite B Katula C Belrast C Kilchis C Beffingliarn D I sap Bellingham variant C — _R IOUs C Boistrurt 13 Klonc D Bow 1) Lates C Briscot 1) Lcbnni B Buckley C Lurnmi D Bunker B Lynnwood A. Cagey C Lystair B Carlsborg A Mal C Cney D Manley B Cassolary C Mashel 8 Cathcart B Mayiown C Centralia B McKenna D Chehalis B McMurray D Chesaw A Melbourne B Cinebar a Men7el B Clallarn C Mixed Alluvial variable Clayton B Molson Coastal beaches variable Mukilteo C/D Colter C Naff a Custer D Nargar A Custer, Drained C National B Dabob C Ncilton A Delphi D Newb, . erg Dick A Nisquially Dirnal 0 Nooksack C Dupont D Nornm CA) Earlmont C Ogart Y* C Edgewick C Olete C Eld 8 010111ount C Elwell 0 Olympic B Esquatzel 13 Orcas D Everett A Oridia D Everson D Orting D Galvin Oso C Getchell A 'Oval] C Giles 8 Pastik C Godfrey D Illeency C Greenwater A Phelan D Grove C Pilchuck C liarstine C Potchub C Ulartnit C Poulsbo C Hoh B Prather C August 2001 Volume III - Hydrologic Analysis and Flow Control BMPs 2-19 STORKWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN Table 111-1.3 (Published by SCS in 1982) scs western Washington Runoff curve Numbers . Runoff curve numbers for selected agricultural,. -suburban and urban 4.04&� CURVE NUMBERS BY LAND USE DESCRIPTION HYDROLOGIC SOIL GROUP A B* C D Cultivated land(l): winter condition 86 91 94 95 Mountain open areas: low growing brush A grasslands 74 82 89 492 Meadow or pasture:__ 65 78__(�5 89 Wood or forest land: undisturbed 42 64 76 81 wood or forest land: young second growth or brush 55 72 ell 86 Orchard: with cover crop 81 as 92 94 open spaces# lawns, parks, golf courses, cemeteries, landscaping. Good condition: grass cover on 05% of the 68 80 90 Fair condition: area grass cover on 50-75% of 77 as 90 92 the area Gravel toads & parking lotet '76 85 89 9i Dirt roads & parking lots: 7 1 2 82 87 89 Impervious surfaces, pavement, roofs etc. 98 9 98 open water bodies: lakes, wetlands, ponds etc., 100 100 100 100 single family residential(2)-., Dwelling Unit/Gross Acre %1mperv1ioue(3) separate curve number 1.0 DU/GA is shall be selected for I.S DU/GA pervious & impervious 2.0 DU/GA 25 portions of'the site 2.5 DU/GA 36 or basin 3.0 DU/GA 34 3.5 DU/GA 38 4.0 DU/GA 42- 4.S DU/GA �46 5.0 DU/GA 48 5.5 DU/GA so 6.0 DU/GA 52, 6.5 DU/GA 54 7.0 DU/GA 156 PUD's, condos, apartments, %impervious commerc*. 1 businesses must be industrial areas computed (1) For a moredetAiled description of agricultural land use curve.numbers refer to National Engineering Handbookj Sec. 4, Hydrology, Chapter 9, August 1972. (2) Assumes roof and driveway ruhoff.is directed into street/stor'm system. (3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers. FEBRUARY, 19,92 IMPERVIOUS AREA: BUILDING. 6, JJ6 SF PA VEMEN T- 94J SF SIDEWALKS: 408 SF TO TA L: 7,687 SF (0. 176 � ACRES) SITE AREA: 14,294 SF (O.J28 ACRES) IMPERWOUS AREA EXHIBIT 12-11-07 MICHEL WALNUT SWET CON00"S 10063 EX C9 EX CB EW 5&56(8-E) 1W 511,78(12-S) 1� 4 NY, :0.90(12'S) !NV. O.:�8-0 5&5 a M!) INV. 60. 9-W) INV, 5-3,4" Ej - — — — — — — — — — — — — — — — — — WALNUT STREET �1. N) 41 7SD ss— 3M.V5 N 89*4,V34' E 160.00. EX ca :Nv. 54.10(12r-H) NY. 54.08(8*S) 7 T r --- ... .. . ... T T;777:;*., .. x F TV SIGN 130.00' 6 AR CE ICY F FH EX. 3- BRASS PLATE -- — — — — — — — — — — E 70.00' w wom 30* 3Q' n Dt ca FENCE p D SIGN MV. 61,7 12* la z Nv. stwe WATER < 2'-V HIGH Mw 33VAULT COW,', PARCEL C CoNc )o L' 01 CoNrl CA r-:� C3 to 13 ci PARCE (D z A Z 0 APLEML) EX. HOUSE Ln I 0 )o 130 rn �2 (A C5 D cs. U! C) N F5� =1 t-t WE 3' RAIL ';�:woo 60.001 k Ot Ci 01 84 1 C) (n EX C8 I @ Tw MAW LAY 0 6 0 INV. �s RAL 1� IN, FEN CA -0 INV. S4.07(IrN EX. BLDG SD m CHERRY ca c� Nv. 81,74(t PARCEL 8 :Nv. 81,40c. NV. W62( Nv. 5&85( SECTION LINE ZZZ//////Z E. '-tf 2"MNE _--ld 2' 14 RNE 30.00, FENCE 1M 00' -*"HIGH CONQ WALL Do' :5 338.62' N 89-44'14* E FOUND EX. [RON PIN 1, —7-w� FOUND EX. IRON PIN I C waw—J WTH PLASTIC AP INV. 5&SX4-SW) cs INV. S&q'x4*E) NTH PLASTIC CAP EXTRU CUREI NO'D LSA#17970 1W 5&514-W) NY. S&8%4-%V) NO'D LSA#17970 FOUND EX. IRON PIN D INV. 57 71 1 Er E) "V' m:�' 8* N) (0,40-E & 0.03'N) VATH PLASTIC CAP (0.55*E & OJON) INV. 57'62(lirl,l) INV. Eim 8-w) NO'D LSA#22969 U) 0 D U N P L AT T E D 71ME OF CONCEN7RARON EXHIBIT E MICHEL WALNUT SIREET CONDO'S 0 0063 12-12-07 R 41"v T, ---------------------- S'S"4eAle:4 M�5Abe)W,=eAtz- 2� i5 vv4 vaeb �5;,o A1.4 /,r/ /,5- 2, A CR c r 76 A CROS TH6 7—F,,z i5rcz�c 5/1/08 4:31:49 page 1 dr 316 Walnut- Street 31 DIA DETENTION PIPE BASIN SUMMARY BASIN ID: A10OX SCS METHODOLOGY TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : NAME: 100 YR, 24 HR EXISTING 0.33 Acres TYPElA 3.00 inches 10.00 Min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.11 cfs VO L: I . BASIN ID: AIOX SCS METHODOLOGY TOTAL AREA ....... RAINFALL TYPE.�..: PRECIPITATION .... : TIME INTERVAL .... : BASEFLOWS: AREA. . : CN.... : TC.... : 0. 00 cf s PERV 0,33 Acres 85'.00 13.86 min 0.04 Ac-ft TIME: 510 min NAME:.10 YR 24 EXISTING 0.33 Acres BASEFLOWS TYPEIA 2.00 inches AREA..: 10. 00 min CN. TC.:!::: 0. 00 cf s PERV 0.33 Acres 85.00 13.86 min ABSTRACTION COEFF: .0.20 PEAKRATE: 0.05 cfs VOL: 0.02 Ac-ft TIME: 510 min BASIN ID; A2X . SCS METHODOLOGY TOTAL AREA ...... RAINFALL TYPE .... PRECIPITATION .... TIME INTERVAL ...... NAME: 2-YR 24 EXISTING 0.33 Acres TYPElA 1.50 inches 10.00 min BASEFLOWS: AREA. . : CN .... : TC .... : 0. 00 cf s PERV 0.33 Acres 85.00 13.86 min ABSTRACTION COEFF: 0.20 TcReach - Sheet L: 84.00 ns:0.1500 p2yr: 1.50 s:0.0476 TcReach - Sheet L:, 53.00 ns:0.1500 p2yr: 1.50 s:0.0755 PEAK RATE: 0.02 cfs VOL: 0.01 Ac-ft TIME: 510 min BASIN ID: B100D SBUH METHODOLOGY TOTAL AREA.....,.�..: RAINFALL TYPE .... PRECIPITATION .... TIME INTERVAL .... NAME: 100 YR 24 HR, DEVELOPED 0.33 Acres TYPElA 3.00 inches 10.00 min BASEFLOWS: AREA. . : CN .... TC .... 0. 00 cf s PERV 0.15 Acres 86.00 6.30 min ABSTRACTION COEFF: 0.20 ' PEAK RATE:. 0.17 cfs VOL: 0.06 Ac-ft TIME: 480 min IMP 0.00 Acres 0.00 0.00 min IMP 0.00 Acres 0.00 0.00 min IMP 0.00 Acres 0.00 0.00 min IMP 0.18 Acres 98.00 6. 3 0 min 5/1/08 4:31:,49 page 2 w 316'Walnut Street 0 3" DIA DETENTION PIPE - -------------------- BASIN SUMMARY BASIN ID: B10D NAME:.10.YR 24 NRI DEVELOPED SCS METHODOLOGY TOTAL AREA ....... : 0.33 Acres BASEFLOWS: 0.60 cfs RAINFALL TYPE .... : TYPElA PERV IMP PRECIPITATION .... : 2.00 inches AREA..: 0.15 Acres 0.18 Acres TIME INTERVAL ... 0. 10. 00 min CN.' 86.00 98.00 TC.:.**.:: 6.10 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0,10 cfs VOL: 0.04 Ac-ft TIME: 500 min BASIN ID: B2D NAME: 2 YR 24 HR DEVELOPED SCS METHODOLOGY TOTAL AREA ....... 0.33 Acres BASEFLOWS: 0.00,cfs RAINFALL TYPE—.: TYPElA PERV IMP PRECIPITATION.... : 1.50 inches AREA..: 0.15 Acres 0.18 Acres TIME INTERVAL.o..: 10.00 min CN.�t.: 86.00 98.00 TC.... 6.30 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.07 cfs VOL: 0.02 Ac-ft TIME: 500 min 3 5/1/08 4 .-3 1: 4,Vm 316 Wa lnut Streeo page 31 DIA DETENTION PIPE HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres 1 0.021 510 519 cf 0.33 2 0.048 510 917 cf 0.33 3� 0.113 510 1836 cf 0.33 4 0.068. 500 1068 cf 0.33 5 0.102 500 1570 cf 0.33 6 0.166 480 2714 cf 0.33 11 0.019 640 1068 cf 0.33 12 0.054 530 1570 cf 0.33 13 0.108 500 2714 cf 0.33 5/1/08 4:33:1 v m 3116 'Walnut Street* page 31 DIA DETENTION PIPE STORAGE STRUCTURE LIST UNDERGROUND PIPE ID No. P1 Description: 31 DIA DETENTION PIPE Diameter: 3.00 ft. . Length: Slope... : 0.0000 ft/ft upstr:- [)e4-errn,jje J)ecreose I VI Pe Od 1 57. 00 ft. dnstr: % 13 S2-' 3 I -3 6.34 7R� 316 Walnut Sttee 31 DIA DETENTI PIPE ------------------- DISCHARGE STRUCTURE LIST MULTIPLE ORIFICE ID No. 01 Description: ORIFICE Outlet Elev: 55.00 Elev: 54.85 ft Orifice Diameter: 0.7500 in. Elev: 56.60 ft Orifice 2 Diameter: 1.6500 in. 5/2/08 11:56 m page 2 316 Walnut Streeo 31 DIA DETENTION PIPE LEVEL POOL TABLE SUMMARY KATCH INFLOW -STO- -DIS- <-PEAK-> STORAGE M)j-r(H < -------- DESCRIPTION --------- > (Cfd) (cfs) --id- --id- <-STAGE> id VOL (cf) WAK 2 YR, 24 HR .................. 0.02 .0.07 PI 01 56.53 11 - 206.85 cf o .0 2. 10 YR, 24 HR ................. 0.05 O.1D Pi 01 56.81 12 254.43 ef 0. OS' 100 YR 24 HR ................. 0.11 0.17 PI 01 57.86 13 395.58 cf 0 1( 11 F. CUT FILL EL. CUT (SF) nLL (SF) 50.9 6,460 0 52 6,607 0 54 7, IX 0 56 9,495 0 58 8,901 0 60 8,74J 156 62 J,616 0 Ol 64 1,402 0 66 259 0 GRADING CALCULA 71ONS WALNUT S77?EET CONDO'S 66 1-13-08 006J 0 Grading Quantities Walnut Street Condo's Section 50.9 52 54 56 58 60 62 64 66 Total Cut (CY) 3,658 Net cut this estimate = Cut Ave End Distance Volume (sq M (ft) (cy) 6460.0 6,534 2.00 484 6607.0 6,869 2.00 509 7131.0 8,313 2.00 616 9495.0 9,198 2.00 681 8901.0 8,822 2.00 653 8743.0 6,180 2.00 458 3616,0 2,509 2.00 186 1402.0 831 2.00 62 259.0 130 2.00 10 f0ject No.: 0063 Date: 14-Jan-08 By: MPI Total Fill (CY) 12 3,647 cubic yards Fill Ave End Distance Volume (so M (ft) (cy) 2.00 2.00 2.00 78 2.00 6 156.0 78 2.00 6 2.00 2.00 2.00 Page 1 i . I CITY OF EDMONDS ARCHITECTURAL DESIGN BOARD MEETING Synopsis - 1 .1 S 2001> MARCH 7, 2007 Chair Valerie Kendall called the March 7, 2007 meeting of the Architectural Design Board to order at 7:00 p.m., at the City Council Chambers, 250 6" Avenue North, Edmonds, Washington. I ROLL CALL: Board members Dresent Valerie Kendall Richard Schaefer Betti Jo Smith Michael Mestres Board member Utt was absent. Staff presen Gina Coccia, Planner Linda Aynd, Recorder APPROVAL OF ARCHITECTURAL -DESIGN BOARD MEETING MENUTES: BOARD MEMBER SCHAEFER MOVED, SECONDED BY BOARD MEMBER MMSTRES, TO APPROVE THE MINUTES OF FEBRUARY 7,2007. THE MOTION CARRIED UNANIMOUSLY. APPROVAL OF AGENDA: BOARD MEMBER SCHAEFER MOVED, SECONDED BY BOARD MEEMEBER SMITH, TO APPROVE THE AGENDA FOR MARCH 7,2007. THE MOTION CARRIED UNANIMOUSLY. AUDIENCE CONEVIENTS: None. CONSENT AGENDA: None PUBLIC HEARINGS - MINOR PROJECTS: None. PUBLIC HEARINGS - MAJOR PROJECTS: I FILE NO. ADB 2006-149: Application by Michel Construction for a new 5-Unit Multi -Family buildi�g located at 316 Walnut Street in the Multiple Residential (RM-2.4) zone. BOARD MEEMBER NMSTRES MOVEDTO APPROVE THE PROJECT UNDER THE GUIDELINES THAT HAVE BEEN ILLUSTRATED BY STAFF AND THAT THE PROJECT MEETS ALL CODES AND REGULATIONS. HE THOUGHT IT WOULD BE A POSITIVE NEW BUILDING FOR EDMONDS. Architectural Design Board Meeting Page I March 7,2007 - Synopsis -Chaii-woman Kendall and Board member Schaefer suggested Mr. Mestres provide a more detailed motion. BOARD MEMBER MESTRES AMENDED THE PREVIOUS MOTION, SECONDED BY BOARD MEMIBER SMITH, TO APPROVE THE PROJECT DESIGN CONDITIONED UPON THE FOLLOWING ITEMS: 0 THE LANDSCAPE PLAN IS REVISED TO REFLECT THE DESIGNATED TREES, I.E., GINGKO BIELOBA,'PRINCETON SENTRY'AND/OR MAII)ENHAIR. TREE ON WALNUT STREET; IT IS THE RESPONSIBILITY OF THE APPLICANT TO APPLY FOR AND OBTAIN ALL NECESSARY PERMITS. THE BOARD FINDS WITH THESE CONDITIONS THE PROPOSAL IS CONSISTENT WITH THE COMPREHENSIVE PLAN AND OTHER ADOPTED CITY POLICIES, AND THE PROPOSAL SATISFIES THE CRITERIA AND PURPOSES OF ECDC CHAPTER 20.10 — ADB CRITERIA AND ECDC CHAPTER 20.12 — LANDSCAPING, AND THAT STAFF HAS FOUND THE PROPOSAL MEETS THE REQUIREMENTS OF THE ZONING ORDINANCE. MOTION CARRIED UNANIMOUSLY (4-0). CONSOLIDATED PERMIT APPLICATIONS (No Public Participation): FILE NO. ADB-2006-154: Application by Robert & Judy Reichler for a second -story addition to an existing medical office building located at 21827 76th Avenue West in the RM-2.4 zone. BOARD MEMBER 'SCHAEFER MOVED, SECONDED BY BOARD MEMBER MESTRES, TO RECOMMEND APPROVAL BY THE ARCHITECTURAL DESIGN BOARD TO THE * HEARING EXAMINER OF ADB FILE NO. 2006-154 WITH THE FOLLOWING CONDITIONS: INDIVIDUAL ELEMENTS OF TTIE PROJECT ARE REQUIRED TO MEET ALL APPLICABLE CITY CODES: 0 SPECIFICALLY, THE ADDITION MUST BE DESIGNED SO THAT IT CLEARLY REMAINS OUTSIDE OF THE 15-FOOT WEST STREET SETBACK; SPECIFICALLY, THE PROPOSED USE OF THE BUI[LDING WILL NEED TO BE CONFIRMED SO THAT IT CLEARLY MEETS THE PARKING REQUIREMENTS; SPECIFICALLY, T.HE- ROOF WILL NEED TO 'BE DESIGNED SO THAT IT ENCLOSES THE MECHANICAL EQUIPMENT AND CLEARLY MEETS THE 4/12 PITCH REQUIREMENT FOR THE HEIGHT OF THE ROOF BETWEEN 25 AND 30 FEET. IT IS THE RESPONSIBILITY OF THE APPLICANT TO APPLY FOR AND OBTAIN ALL NECESSARY PERMITS. THE PEDESTRIAN ACCESS FROM 76' AVENUE SHALL BE MODIFIED TO AVOID HAVING TO TRAVEL THROUGH A PARKING AREA. THE BOARD FINDS WITH THESE CONDITIONS THAT THE PROPOSAL IS CONSISTENT WITH THE COMPREHENSIVE PLAN AND OTHER ADOPTED CITY POLICIES, AND THE PROPOSAL SATISFIES THE CRITERIA AND PURPOSES Of ECDC CHAPTER 20.10 — ADB CRITERIA AND EeDC CHAPTER Architectural Design Board Meeting Page 2 March 7,2007 - Synopsis of EI)Af "04', CPO CITY OF EDMONDS 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220 RCW 197-11-970 Determination of Nonsignificance (DNS) DETERMINATION OF NONSIGNIFICANCE Description of proposal: The proposal is to construct a new 5-unit multi -family condominimum building on a lot of approximately 14,294 squareJeet in the Multiple Residential (RM-2.4) zone. There is a pending Architectural Design Board (ADB) file for the design review of the project (ADB-2006-149) and'the public hearing will be held on March 7, 2007 at 7:00 PM in the Council Chambers (250 5th Avenue North). The project also proposes to cut approximately 2000 cubic yards of material in order to keep the building under the height limit. Proponent: Michel Construction, Inc., represented by Dwight McGrew. Location of proposal, including street address if any: 318 and 320 Walnut St. and 404 4h Ave S. Lead agency: CITY OF EDMONDS The lead agency has determined that the requirements for environmental analysis and protection have been adequately addressed in the development regulations and comprehensive plan adopted under chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW 43.21C.240 and WAC 197-11-158 and/or mitigating measures have been applied that ensure no significant adverse impacts will be created. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. XX This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below. Comments must be submitted by February 28, 2007. Project Planner: Gina Coccia, Planner Responsible Official: Rob Chave, Planning Manager Contact Information: City of Edmonds 1121 5th Avenue North, Edmonds WA 98020 1425-771-0220 Date: D-P-l+-,'J-0DT Signature: r-012- F-oe, (,HAVV, XX You may appeal this. determination to Rob Ch6ve, Planning Manager, at 121 5th Avenue North, Edmonds WA 98020, by filing a written, appeal citing the sp ecific reasons for the appeal with the required appeal fe ' e, adjacent property owners list and notarized affidavit form no later than February. 28, 2007. You should be prepared to make specific factual objections. Contact Gina Coccia to read or ask about the procedures for SEPA appeals. XX Posted on February 14, 2007, at the Edmonds Public.Library, Edmonds Com ' munity Services Building, and the Edmonds Post Office.. XX Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of. the Checklist. Page I of 2 SEPA DETERNONATIONJIMALNUTDOC 2114/07.SEPA Mailed to the following along with tihe-En'ir6n' "Checklist: V mental XX Environmental Review Section XX Department of Ecology P.O. Box 47703 Olympia, WA 98504-7703 XX XX COMCAST Outside Plant Engineer, North Region 410 Valley. Ave NW #12 Puyallup, WA 98371-3317 XX XX ApRlicant: Michel Construction, Inc Dwight MVrew 7907212 StreetSW#102 Edmonds WA 98026 Attachments pc: File No. ADB-2006-149 SEPA Notebook 0 Q. I-? I73a DA" crry or SEVJA.OE EDWNDS TREATMENT PLANT -1 09f UNDOWNE) (A CONDO, 11 L S 4-097 10 0 011..-W.111-­'1111.� r 4-157 4-099 STELLA'S LANDING (A (8433) 4-103 4- 1-012 Olympic View Water & Sewer District 23725 Edmonds Way Edmonds, WA 98020 Puget Sound Energy Attn: Elaine Babby PO Box 90868, M/S XRD-1W Bellevue, WA 98009 Dean Saksena, Senior Manager Snohomish Co. PUD' PO Box 1107 Everett, WA 98206-1107 -054 1: [ 4 g7atl� ,[WEzw 14 A 40-49 A ST co jr t, to. fo E-71711 4-067 jr-W r, I' U010 bp r AVE S 4-071 2_�2w_mla) (A =ff) 06 .4- 7, 4-072: 4-095 4-066 14-079 4-066 4-073. THEATINUM 4-0741 (A d(W601 4-080 4-076; 4 R8 I GA TE A A I CONDO 1 427 0 4-128 (78551 -0-12 4A +143 4- 6 1 �A 00 4-121 4-130 SEAGArl j, EO4 AVENUE C'O'w i ZJ4 6 4-142 Mao 4-098 rmi* J 4-137 1 1 L11 2 4- 141 j 2 4-118 X 4-132 Do fP14 2: F02 4-112 PLACE -4 4- 4" MW SEA 26 25 !? Page 2 of 2 SEPA DETERNONATION_316WALNUTDOC 2/14/07.SEPA AV41im-F-W m- 1=1-a I CITY OF ED-M'* ONDS ENVIRONMENTAL CHECKLIST St. Purpose of Checklik The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all governmental agencies to consider the envirom-nental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. Te purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations- Answer, these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there maybe significant adverse impact. NOTE: Projects generating new traffic will be required to submit a Traffic Study prepared by a licensed Professional Civil Engineer. Specific requirements for the Traffic Study may vary depending upon the project, and will be provided by the City Engi ' neer upon request.- Please contact the Engineering Divisi ;o;;q i4qpq fo V- r specific study requirements. City review of the Traffic Study on at may require assessment of the "Development ProjectE�er iew" fee of $45 plus the cost of the review. :�'+-4-5 - -711 , 0 L-2, 0 Use of checklistfor nonproject proposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "prqject," "applicant," and "property or site" should be read as "proposer," and "affected geographic area," respectively. A. BACKGROUND 1. Name of proposed project, if applicable: A/At AJ 04 3. 5-(A V1 ( 2 Address and phone number of applicant and contact person: Page ) of 24 4. Date checklist prepared:. 5. Agency requesting checklist: City ofEdmonds 6. Proposed timing or schedule (including phasing, if applicable): 007 t�" ASTAFF COMMENTS) 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. A16 (STAFF COMMENTS) 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. C6 CyAld�--J( (STAFF COM f V1 a C"Vk" F1'j C, C, R- A- — D (,p — 0 D (0 Fs 11 VV C[ i VICAI " .9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? Ityes, explain. (STAFF COMMENTS) Page 2 of 24 sepa checklist - public.8.30.2001 0 0 10. List any government approvals or ?ermits that will be needed for your proposal, if known. A A& W-N46WEIr. �AW4AWJ'OffffrA Jr5--IMMK.�Ffffr, fAr (STAFF COMMENTS) _A-D J5 '::� A-I-C�Vl I iTA_-hA rC4 D­e_,�, p,a r 11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site. There are several questions later in this -checklist that ask you to describe, certain aspects of your proposal. You do not need to repeat those answers on this page. 4 YNC 4 W1 —5 (STAFF COMMENTS) -MR- C7 i fC Ub�,�7 i �2� f CL VV� AA (aunuLt 1+ a, �� + - s 4) imn i a vric-O-) 12. Location of the proposal. Give sufficient information for a person to understand: the precise location of your proposed. project, including a street address, i,f anyi and -section, township, and,range, if known. If a proposal would occur over a range of area, provide range or boundaries of the site(s). Providle-legal description, site;p1an, vicinity map, and topographic map, if reasonably available. While 'you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans.submitted with any permit applications related to this checklist. 4- 5: I-akd 44� Ade, �:5; S (STAFF COMMENT LA_ CL V+CA/- Page 3 of 24 TO BE COMPLETED BY APPLICANT B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other: (STAFF COMMENTS) b. What is the steepest slope on the site (approximate, percent slope)l ro C. d. (STAFF COMMENTS) -- What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If you know th I e classification' of agricultural soils, specify them and note any prime farmland. (STAFF COMMENTS)�A� 2 -1- 10 �0yl �O �-F— �9<'� Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. A10 (STAFF COMMENTS)K Page 4 of 24 sqa checkfw - public-.8.30.2001 0 e. Describe the purpose, type and approximate quantities of any filling or grading,proposed. Indicate source of fill. (STAFF COMMENTS) L Could erosion occur as a result of clearing, construction, or use? If so, generally describe. AID (STAFF COMMENTS)--!!j_j+C, V;, f�&[XhVCW [CLt - g. About what percent of the site will be covered with impervious surfaces after project construction (for exam le, asphalt or buildings)? p ; ro (STAFF COMMENTS t5Y- 01 V t GV V tffri A ftw QLA P-M ('\"o� � YlGt LA de, a V t cu-ca 51 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: (STAFF COMMENTS)_ft (fALkOft-d 0A 2. AIR 2. What types of. enussions to the air would result from the proposal (i.e., dust, automobile, odors, and industrial wood smoke) during construction and when the project is completed'? If any, generally describe and give approximate quantities if known. 6- - 6040M) C-71'061 C60S7 (STAFF COMMENTS Page5 of24 0 b. Are there any offmsite sources of eniissions or odor that may effect your proposal? If so, generally describe. Alo (STAFF COMMENTS C. Proposed measures to reduce or control emissions or other impacts to the, if any: (STAFF COMMENT 3. WATER a. Surface: (1) Is there any surface water body on or in the immediate vicinity of the'site (inc luding year-round and seasonal streams, saltwater, lakes, ponds, and wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Cr ITL- you iyn (STAFFCOMMENTS) A-400tAi t' LOtOUV— 6()kA-1-0. (2) Will the project require any, work 9ver,inil or adjacent to. (within 200 feet) the described waters? If yes, please describe and attach available plans. ISTAFF COMMENTS (3) Estimate the amount of rill and dredge material tha ' t would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. (STAFF COMMENTS Page 6 of24 sqm checklist - public:8.30.2001 (4), Will the proposal require -surface water withdrawals or diversions? Give general description, purpose, and approx imate quantities if known. Alb (STAFF COMMENTS) (5) Does the proposal lie within a 100-year floodplain? If.so, note location on the site plan. Ala (STAFFCOMMENTS No - (6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. (STAFF COMMENTS) b. Ground: (1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and,approximate quantities if known. A10 (STAFF COMMENTS) Page 7 of 24 0 0. (2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals"; agricultural; etc.). Describe the general siie of the�system, the numberof such systems, the number of houses to be served (if applicable)"- or the number of animals or humans the system(s) are expected to serve. (STAFF COMMENT C. Water Runoff (including storm water): (1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. r.%" W 'URF 'Ir " Y/710T_6 Ktl I (STAFFCOMMENTS - A-fo aAkAire-d bLA tvie, Gnagine_eKn� ovyfs,'". (2) Could waste materials enter ground or surface waters? If so, generally describe. A10 (STAFF COMMENTS d. Proposed measures to reduce or control surface, ground;- and runoff water impacts, if any: (STAFF COMMENTS Page 8 of 24 sepa checkfist - puNk:8.30.2001 4. Plants a. Check or circle types of vegitation found on the site: a , as deciduous tree: alder.e� pen, Other: evergreen tree: fir<c:e:d� other: -5p76- V/ shrubs -7 grass — pasture — crop or grain wet soil.plants: cattail, buttercup, bulrush, skunk cabbage, other: water plants: water lily, eelgrass, milfoil, other: other types of Vegetation: (STAFF COMMENTS). I L QI C-7 d tAl -h (A i V F— ?—t-rA--h DY-1 b. What kind and amount of vegetation will be removed or altered? (STAFF COMMENTS) C. List threatened or endangered species known to be on or near the site. AbA.C. (STAFF COMMENTS Page 9 of 24 d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site, if any: ACL WpAtlnp 6ea4S AMU (STAFF COMMENTS) LA f KT—& -hne AYLWij-GGjj'tKAj 5. Animals a. Check or circle any birds and animals that have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: (STAFF COMMENTS) 6 J--Vi ff V),e,61rd 4'6 �J*C(VA�hj Cjk-kVAVI� -17Y\C, 0-670-- I . 1.11 b. List any threatened or endangered species known to be on or near the site. (STAFF COMMENTS) C. Is the site part of a n-dgration route? If so, explain. (STAFF COMMENTS) Page 10 of 24 sq� ch-kfiss - public- 8 30 2001 d. - Proposed measures to preserve or enhance wildlife if any: A]nL4.p (STAFF COMMENT 6. Energy and Natural Resources a. What kinds of energy electri atural as oil, wood stove, solar) will be used to meet the completed project's en . ergy needs? tepscribe owh�et �erit will -be used, for heating, manufacturing, etc. (STAFF COMMENTS) b. Would your project affect the potential use of solar energy'by adjacent properties? If so, generally describe. Ak (STAFF COMMENTS) C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control - energy impacts, if any: %-z V r%.W1_-,W% - (STAFF COMMENTS) Page I I of 24 7. Environmental Health - - 2. Are there any environmental health hazards,—iticluding exposure to . toxic chemica . Is, risk of fire and explosion, spill, or hazardotts waste, that could occur as a result of this proposal? If.s.o describe. (STAFF COMMENTS (1) . Describe special emergency services that might be required. (STAFF COMMENTS) (2) Proposed measures to reduce or control environmental health hazards, if any: (STAFF COMMENTS) b. Noise (1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? (STAFF COMMENTS) Page 12 of 24 sepa chockfw - pubfi�9.30.2001 (2) What types and levels of noise would be created,by or associated with the project on a short-term or a long-term' basis (for example: traffic, construction,,bperation, other)? Indicate what hour's noise would come from the'�site. (STAFF COMMENTS) (3) Proposed measures to reduce or control noise impacts, if any: (STAFFCOMMENTS) &C/DC- Mike -5-30 NDiC;7e_, 8. Land and,Shoreline Use a. What is.the current use of the site and adjacent properties? —31 tp_ : si=!e 0�lc AP 3: ME WF IA/ ., SF (STAFF COMMENTS) 21 f, ro R C11-i tD toe \/Ve-G-t (7,fl?CCJ1(,5 -f7> of Cu c2inAkc fay,/0 r '01VAA C-11A r"' LAA Qk __Y LILAJ BP k, C_ d to --h'6( k\A — 1, b. Has the site been used for agriculture4 If so, describe. (STAFF COMMENTS Page 13 of 24 C. Describe any structures on the site. -11NIT !V! (STAFF COMMENTS d. Will any structures be demolished? If so, what? (STAFF COMMENTS) e. What is the current zoning classification of the site? 12-+ (STAFF COMMENTS) P—M —7,-�t) L What is the current comprehensive plan designation of the site? (STAFF COMMENTS) ML41fi F�-Clmj� —�hqVi 0�eri,9itY, g. If ap lic ble, what is the current shoreline master plan designation of the site? (STAFF COMMENTS) {x)e- - Page 14 of 24 sepa chmkfist - pubfic:8.30.2001 0 h. Has any part of the site been classified as an "environmentally sensitive" area? If so, s cify , I- . pe (STAFFCOMMENTS) ND- 0- 4wafirty- 11 wol!� -tjne, C-rf-hca A-cca6 d avyi� A V1 a -b co ( ;q o c,"jn- c-Q t a ,-cq 5 u ri qY7 D Y, CLOI I'll CtAi f- tp -A-H-rl PYV j2fj�fY.-. i. Approximately how many people would reside or work in the completed project? (STAFF COMMENTS) dMfflA1f1n1q IAIV131-5, j Approximately how many people would the completed project displace? (STAFF COMMENTS Wc r7oc*70-rae, IL Proposed measures to avoid or reduce displacement impacts, if any: ,A/01A 42- (STAFF COMMENT 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: (STAFFCOMMENTS) (19-1A) 'PIC --r= -Z "Id itv-h` V L 4 Page 15 of 24 0 a- 9. Housing a. Approximately how many units would be provid6d, if any? Indicate whether high, middle, or low4ncome housing. ljAl( 71C #tJ10,C) (STAFF COMMENTS b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income housing. (STAFF COMMENTS) C. Proposed measures to reduce or control housing impacts, if any: (STAFF COMMENTS) 10. Aesthetics 2. What is the tallest height of any proposed structure(s), not including antennas; what is the principle exterior building material(s) proposed? (STAFF COMMENTS CkX V A e4'CA Y� r D Of C'n tLA i F a pq,(�"z5 of -A -vie Moom j-Ni-f_ �,T-rA-tr'ct C4 e- a- 1� 10 12 4r, D V1 0 Y" /IV,- . F-A ;p 61-'a b rl c <- cL '5 e119 ) C" vr 1 po!�-'Gilok->- C,4�,&A r _fO C*A'a, Page 16 of 24 sepa chccklist - pubfic:8.30.2001 b. - What views in the immediate vicinity Would be altered or obstructed? (STAFF COMMENTS). C. Proposed measures to reduce or control aesthetic impacts, if any: ,#AM — — - '- I - — If (STAFF COMMENTS) _AYL/V) � tLC-I-JA V-14 -0 a . 1 4 - V' IL Light and Clare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? (STAFF COMMENTS).. Uoitn b. Could light or glare from the finished project be a safety hazard or interfere with views? 't I (STAFF COMMENTS) C. What existing off�site sources of light or glare may affect your proposal? A /- (STAFF COMMENTS) Page 17 of24 d. Proposed measures to reduce or control light and glare impacts, if any: (STAFF COMMENTS) 12.. Recreation a. What designated and, informal recreational opportunities are in the immediate vicinity? (STAFF COMMENTS) b� Would the proposed project disp lace any existing recreation uses? If so, describe. (STAFF COMMENTS C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: A-bA -e- (STAFF COMMENTS) Page 18 of 24 scpa ckcklist - public:8.30.2001 0 � � 1.. 0 13. Historic and Cultural Preservation a. Are there any places or oV1jects listed on, or proposed for, national, . state, or local preservation registers ,known to be on or next to the site? If so,*generally describe- 11 (STAFF COMMENTS) b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. (STAFF COMMENTS) C. Proposed measures to reduce or control impacts,. if any: (STAFF COMMENTS) 14. Transportation Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if anv. (STAFF COMMENTS)--bA-4—Q---(L0V a --j-1--r� C rbi.-D off we�?+ Gl�dp- ( Qkftj� - Page 19 of24 b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit stop? (STAFF COMMENTS C. How many parking spaces would the completed project have?- How many would the project.elinlinate? ML (STAFFCOMMENTS) v- �y a+ d. Will the proposal require any new roads, streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). (STAFF COMMENTS A -a re-qu i rr- i-ne- ew viee,"'v'iq ofV(SI'DY-7. 'J e. Will the project use (or occur in the immediate Vicinity Of) Water, rail, or air transportation? If so, generally describe. A)d (STAFF COMMENTS) Pag� 20 of 24 sepa dxckhst - pubFw--9.30.2001 How -InanT yehicular trips per day would be generated � by the completed project? peak volumes would occur. If known, indicate when (STAFF COMMEN — () � V1 IX VVI - 9. Fro osed m . eas . ure to reduce.or control transportati . on impacts, if any: 77 (STAFF COMMENTS _ 4:a rLq LA I- rr I ri A�n 4 1 15- Public Services a. I Would the project result in an increased need for public services (for example: fire pro tection, police protection, health care, schools, other)? If so, generally describe. (STAFFCOMMENTS)_15 V1 I' til:;�7 121% n 12 UV\ a j/\ qe b. Proposed measures to reduce or control direct impacts on public services, if any: (STAFF COMMENTsj--- -V1 Page 21 of 24 16. Utilities a. C ju!e ptlities-c.urreptly available at the site: 6g�k =natural gas �efuse service (sanft—VT—se—wiereptic' systeinj other: (STAFF COMMENTS b. Describe the utilities h p ry .J at�are,pro osed for -the projectL the utility providing. the -se ice, and the general construction activities on the site or in the immediate vicinity which might be needed. CO ftfASE (STAFF COMMENTS) C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its deci<o—h. of Proponent Date Submitted Page 22 of 24 scp� d=Uisl - pubfic:8.30.2001 Of EDA, CITY OF EDMONDS 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425)771-0220. ADDENDUM TO EXISTING ENVIRONMENTAL DOCUMENT Addendum to (check appropriate box) DNS EIS El Other Description of current proposal: Increase in dwelling units from 5 to 7 for previously approved multi family project at 318 an d 320 Walnut Street (previous SEPA QNSs for files ADB-2006-149 and R-2007-28). Proponent: Michel Construction Location of proposal, including street address if any 318 and 320 Walnut Street Title of document being added to. Determination of Nonsignificance Agency that prepared document being adopted City of Edmonds Date document was issuect. February 14, 2007 (ADB-2006-149) and May 4, 2007 (R-2007-2,1 �8) Addendum:- The DNS issued for ADB-2006-149 was based on existina zonina of RM-2.4 and a 5-unit multi family Pro6ect. The applicant has reauested a rezone which will increase the nurn . ber of units located within the Previousiv aDDroved building, and submitted a SEPA checklist to address the environ ental impacts associated with the rezone. A DNS for the rezone has been issued on May 4, 2007. Even though the rezone is increasing the number of units in the building, the Prooect design and site plan is not changing. The combination of the DNSs issued for the original 5-unit Proiect and the subsequent rezone address all foreseeable environmental impacts related to the current 7-unit multi family Proiect, and is the basis for this addendum. Name of agency making addendum: - Citv of Edmonds Contact person, if other than responsible official: Phone:. (425) 771-0220 Responsible official: Robert Chave Position/Title: Planning Manager Phone:— 425.771.0220 Date: 5/4/2007 Fj WAC (411 . 5/98j C:T'1dRcports\McheW-2007-28 SEPA Addendum.doc 5/4/07 of E L) A, 0 D C1 * �TY OF-EDMON . S: 121 5TH AVENUE. NORTK EDMONDS, WA. 98020 (425) 771-0220 RCW 197-11-970 Determination of Nonsignificance (DNS) DETERMINATION OF NONSIGNIFI CANCE Description of.proposal.: Rezone. property located at 318 and 320 Walnut Street from RM-2A to RM-1.5 (File N6.: R-N07-28). Proponent: Michel -Construction Location. of proposal, including -street address if any: 318 and 320 Walnut Street Lead agency: CITY OF EDMONDS The, lead agency has determined that the requirements. for environmental analysis and protection have been adequately addressed in the development regulations and comprehensive plan adopted under chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW 43.21C.240 and W4C 197w-11-158 and/or mitigating measures have been 'applied that ensure no significant adverse impacts will be created. An environmental impact.statement is not required under RCW 43.21.030(2)(c). - This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. xx This DNS is issued under 197-11-340(2);.the lead agency will not act on this proposal for 14 days ffom the date below. Comments must be submitted by May 18 2007. Project Planner: Responsible Official: RobertChav Positionffitle: M�nager - Planning Division Phone: 425-771-0220 Address: City of Edmonds, 121 5th Avenue North, Edmonds, WA 98020 Date: May 4, 2007 Signature:_ xx *You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue North, Edmonds, WA 98020, by filing a written appeal citing the specific reasons for the appeal with the.required appeal fee, adjacent. property owners list and notarized affidavit form no later than. May 18, 2007. You should be prepared t o make specific factual objections. Contact Rob Chave to read -or ask about the procedures for SEPA . appeals. XX Posted on. —May 18, 2007, at the Edmonds Public Library, Edmonds Community Services Building, and the Edmonds Post Office. XX Distribute to "Checke . d" Agencies on the rever . se.side of this form, along with a copy of the Checklist.. R-2007-29-SEPA_DNSDOC Page I of 2. 5/4107.SEPA R E COVED WAC 197-11-960 Environmental checklist. APR 2 6 2007 ENVIRONMENTAL CHECKLIST PMIT WMER Purpose ofchecklist: The State Environmental Policy Act (SEPA), chapter 4321C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS). must be prepared for all proposals with probable significant adverse impacts on the quality of the environment The purpose of this. checklist is to provideinformation to help you and the agency identify impacts from your proposal (laid. to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. �nstrucfionsfor applican.ts; This environmental checklist asks you to describe some basic infortnation about your proposal. Governmental agencies us6'.this checklist to- determine whether the environmental impacts of your proposal are signieicant. requiring', preparation * of an- EIS Answer the questions briefly, with the most precise information known, or give the best description you can. You must answe I r each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply." Complete answers to the questions now may avoid unnecessary delays later. . Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you. can. If youhave problems, -the governmental agencies can assist you' ' The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or itsenvironmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use ofchec'khsifor norprojeciproposals: Complete this checkl ' ist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION . complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (partD). ior non -project actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area," respectively. A. 'BACKGROUND. BLANK SPACES MEANS NO CHANCE TO PR EVIOUS SEPA, REQUESTED ADDITIONS TO SEPA ARE BOLD 12 PONT FONT 1. Name of proposed project, if applicable: 316 Walnut 2. Name of applicant: Michel Construction 3. Address and phone number of applicant and contact person: 4. Date checklist -prepared: April 26, 2007 (Addendum to rezone SEPA R-2007-28 a nidAbB 2006-149) 5. Agency requesting checklist:. 6. Proposed timing or schedule (including phasing, if . applicable): 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. Build 5-7 unitxesiden'tial condominium S. List any environmental. information you know about that has been prepared, or will be prepared, directly related to this proposal* ,97 Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. 1] - Give brief, complete description of your proposal, including the pro osed uses and the size of the p Ject and site. 'nere are p r0i several'questions plater in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencie& may modify this form to include additional specific information on project description.) Rezone from RM 2.4 to RM 1.5, thus increasing project size to 7 units (from- 5 units). Building structure will remain the same size, parking will remain the same as previous SEPA at 14 stalls. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably. available. While you sl�ould'submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. B. ENVIRONMENTAL ELEMENTS 1. tarth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other ...... b. What is the steepest slope on the s ite (approximate per -cent slope)? c. . What general types of soils are found on the site (for example, clay, sand, -gravel, peat, muck)?, If you know the classification of agricultural soils, specify them and note any prime farmland. d. Are there surface indications.or history of unstable soils in the immediate vicinity? If so, describe.' e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, construction, or use? If so, generally descri be. g. About what percent of the site will be covered with impervious surfaces after project construction (for, example, asphalt or buildings)? h. Proposed measures to, reduce or control ero�ioq, or other impacts to the earth, if any: - 2 2. Air a. What types of emissions to the air would result from theproposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any,.generally describe and give approximate quantities if known. b. Are there any 9ff-site sources* of emissions or odor.that may affect your proposal? If so, generally describe. c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface: 1) Is there any surfacemater body on or in. the immediate vicinity. of the site (including year-round and seasonal strearns, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project. reqO ire any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge material that would be placed in or removed iiom surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 5) D(>es*the proposal lie within a I 00-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. c. Water runoff (including stormwater): 1) Describe th.e source ofrunoff (including storm water) and method of collection and disposal, if any (include ' quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. 2) Could waste materials enter ground, or sUrfac6mat&s? Ifso -g6nerall des' y cribe. 3 0 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree:, alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs grass _.pasture crop or grain wet soil plants: cattafl, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfbil, other other types of vegetation b. What kind and amount of vegetation will.be removed or altered? c. List threatened -or endangered species known to be on or near the site, d. Proposed. landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: 5. Animals . a. Circle 'any birds and animals which have been observed on or ne* ar the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, othen. fish:. bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: 6. Energy and natural resources a. What kinds o f energy (electric, natural gas, oil, wood stove, solar) will be used to meet Ahe completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. b. Would your project affect the potential use of solar ener I gy by adjacent properties? If so, generally describe. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: 7. Environmental health a.. Are there any environmental health hazards, including exposure to t rii - 1. 1 . -,:. , I "I I- I :. :�. I ' 1. 1 oxiccher cals,risk Pffirei-and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 4 1) Pescr.ibe special emergency services that might be required. 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise ])What types of noise exist in the area which may affect yourproject (f6r example:tr affic, equipment, operation, other)?, I 2)'What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: trafFic, construction, operation, other)? . Indicate what hours noise would come from the site. 3) Proposed measures to reduce or control -noise impacts', if any: S. Land and shoreline use a,. What is.the current use of the. site and adjacent properties? b. Has the site been used for agriculture? If so, describe. c. Describe any structures on the site. 0. Will any.structures be demolished? If so, what?. e. What is the current zoning classification of the site? f What is the current comprehensive plan designation of the site? 9. If applicablej what is the current shoreline master program designation of the site? h. Has any part*of the site been classified as an "environmentally sensitive" area?'. If so, specify. i. Approximately how many people would.reside or work in the completed project? 14 Approximately how many people would the completed project displace? k. Propose . d measures to avoi . d or reduce displacement impacts, if any: 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 9. Housing a. Approximately bow many units would be provided., if any? Indicate whether high, mid�- dl.e, or low-income housing. 7 units —mid income b. Approximately how man y units if any, would be eliminated? Indicate whether high, middle, or low-income housing. 5. 0: C. Proposed measures to reduce or control Ousinguripacts, if any: 10. Aesthetics a. What is the tallest height of any p m . aten I al(s),proposed? roposed.Structure(s), not including antennas; what is the principal . exterior building b. What views in the immediate vicinity would be altered or obstructed? c. Proposed measures I to reduce. or control aesthetic impacts, if any: 11. Light and glare a. What type of lightor glare will the proposal produce? What time of day would it mainly occur? b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off -site sources of light or glare may affec . t your proposal? d. Proposed measures to reduce or control light and'glare impacts, if any: 12. Recreation a. What. designated and informal recreational opportunities are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so, describe. c. . Proposed measures to reduce or control impacts on recr . eation, including recreation . opportunities to be provided by the project or applicant, if any: 13. Histon*c and cultural preservation a. Are there any places or objects listed on, or proposed for, national, state, or local Preservation registers known to be . on,or next to the site? If so, generally describe. - . . q b. Generally describe any landmarks or evidence of historic, archaeological, scientific, orcultural importance known to be on or next to the site. c.. Propose4 measure� to reduce or control impacts, if any: 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to t . he existing street system. Show on.site plans, if any. b. IS Site currently served by public transit? if not, what -is the approximate dista - nce to the nearest transit stop? c. How many parking spaces would the comp!�ted project have?, How many would the project eliminate? d. Will the proposal require'any new roads or streets, or improvements to existing roads of streets, not including driveways? If so, generally' descri . be (indicate whether public or private). 6 0 e. Will the roject uisefor occur in the i" p mmediatei vicinity of) water, rail, or air transportation? If so', generally describe. f. How many Yehidular trips per day would be generated by the.completed.project? If known, . indicate when eak volumes woul d occur. p g. Proposed measures to reduce or control transport I ation impacts, if any 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. . . b- Proposed measures to reduce or control direct impacts on public services, if any. 16. Utilities a. Circle utilities currently availableat the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. b. Describe the utilities that are proposed'for the project, the utility providing the service,and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: .... . ... ..t4Aj:k ...................... ........ ....... ....... ............................................................................................... Date Submitted: ...... 7 TO BE CONIPLETE . D BY APPLICANT EVALUATION FOR AGENCY USE ONLY D. SUPPLEMENTAL -SHEET FOR NONPROJECT ACTIONS (do not use this sheet for project actions) Because these questions are very general, it may be helpful to, read them in conjunction with the list of the elements of the environment. When a.nswerihg.these questions, be aware of the extent.the proposal, or the types of acti ikely to result from the vities li proposal,-, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water;. emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? The rezonewill-not affect any of the above. Any subsequent project ma y slightly increase the above items during construction. Proposed measures to avoid or reduce such increases are: Typical best practices to mmiftnize construction run-off and- debris. 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Rezone will not affect the above. Proposed measures to protect or conserve plants, animals, fish, or marine life are: N/.A 3, How would the proposal be likely to deplete energy or natural resources? Rezone will not affect above. Subsequent project may inerease,or decrease net energy usage due to more efficient construction methods and systems,* Proposed measures to protect or conserve energy and natural resources are: I N/A byl '�OW'40-ri V, 4. How would. the.proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmland . s? None present at.site Proposed measures to protect such resourcesor to avoid or reduceimpacts are:. N/A 8 TO BE COWLETED BY APPLICANT. EVALUATION FOR AGENCY USE ONLY 5. How would the proposal be likely to affect land and shoreline.use, including whether it would allow or encourage land'or shoreline uses incompatible with existin g Plans? S, Nn Not likely to affect any of the.above 60 y- . 'I' - Proposed measures to avoid or reduce shoreline and land use impacts -are - N/A 6. How would the proposal be likely to increase demands on transportation or public services and utilities? el k 'A Rezone will not. Subsequen- t project may result in slight increased demand Proposed -measures to reduce or respond to such demand(s) are: De minimis impacts are foreseen, hence.no'ne deemed necessary 7. Identify, Jf possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environ ment. Proposal will follow and. adhere to all appropriate. laws and requirements. 9 JA At 2008 41TREET FILE RECEIVED JAN 18 2008 BUILDING DEPARTMENT CITY OF EDMONDS Pump Sizing Report for Walnut Street Condos Date Prepared: Prepared for: Site Address: January 15, 2008 Michel Construction, Inc. 7907 212th ST SW Edmonds, WA 98026 (425) 776-2211 316 Walnut Street Edmonds, WA of V, I �ST EXPIRES: 11/05/09 Prepared by.- Donna L. Breske, P.E. 6621 Foster Slough Road, Snohomish, Wa. 98290 Phone: (425) 334-9980, Fax: (425) 334-7380 ........... FILE' d 0 . JA IV 2008 R,ECEIVED JAN. 1:8 2008 BUILDING DEPARTMENT CITY'OF F-FAVIONOS Pump Sizing Report for Walnut Street' Condos Date Prepared: January 15, 2008 Prepared for: Michel Construction, Inc. 7907 212th ST SW Edmonds, WA 98026 (425) 776-2211 Site Address: 316 Walnut Street Edmonds, WA �Is TL S/O NA L �r F E—XPIR-ES: 1 1 /05/09 Prepared by. - Donna L. Breske,, P.E. 6621 Foster Slough Road, Snohomish, Wa. 98290 Phone: (425) 334-9980, Fax: (425) 334-7380 PUMP SIZING REPORT MICHEL CONSTRUCTION, INC. 316 Walnut Street CONDOMINIUM DEVELOPMIENT OVERVIEEW: This pump is sized to pump only a small amount of the flows on site. These are the flows released from an on -site trench drain at the base of the driveway. The trench drain captures runoff from only 800 square feet of driving surface. The proposed pump will be placed in a pump basin, (a Type I -L CB). The flows will then be pumped uphill to the detention vault at the northwest comer of the site. Flows from the detention vault are released via gravity flow to a cb, in the city ROW. DESIGN: The pump is sized to purap the un-detained flows from the 100 year, 24 hr storm. Pump Sizing Parameters are listed below: Maximum Inflow Rate: 4.5 gpm Equivalent Friction Head of pressured conveyance system: 4 feet Elevation Difference from pump to outfall: 8 feet TOTAL HEAD: 12 feet This report includes pump curve data that will meet the above total head and maximum flow rate parameters. A Goulds 1/3 Horsepower Pump is Specified. PUMP CYCLE CALCULATIONS: This report also includes pump cycle calculations to ensure the pump cycle time is greater than one minute per the manufacturer's recommendations. In order to achieve this the on/off float switch setting are set 2 feet apart to allow water volume accumulation before triggering the pump. DRI VEWA Y 800 SF 7RENCH DRAIN BUILDING IMPERWOUS AREA EXHIBIT 1-15-08 AREA THAT IS ROU IED TO 7RENCH DRAIN 0 Goulds Pumps., Submersible 3887ZBHF Sewage Pump FEATURES 0 Impeller: Cast iron, enclosed, non -clog, dynamically balanced with pump out vanes for mechanical seal protection. Optional silicon bronze impeller available. 0 Casing: Cast iron flanged volute type for maximum efficiency. Designed for easy installation on Al 0-20 slide rail. 0 Mechanical Seal: SILICON CARBIDE VS. SILICON CARBIDE sealing faces for superior abrasive resistance, stainless steel metal parts, BUNA4 elastomers. 0 Shaft: Corrosion resistant, 400 series stain- less steel. Threaded design. Locknut on three phase models to guard against component damage on accidental reverse rotation. M Fasteners: 300 series stainless steel. 0 Capable of running dry without damage to components. 0 Designed for continuous operation, when fully submerged. Wastewater R(SOULDS PUMPS Goulds Pumps is a brand of ITT Corporation. www.goulds.com Engine'ered.for life 0 0 HW�* ITT GOULDS. PUMPS Wastewater APPLICATIONS MOTORS Specifically designed for the following uses: Homes Sewage systems Dewatering/Effluent Water transfer Light industHal Commercial applications Anywhere waste or drainage must be disposed of quickly, quietly and efficiently. SPECIFICATIONS Pump Solids handling capabilities: 2" maximum. Capacities: up to 220 GPM. Total heads: up to 58 feet TDH. Discharge size: 2" NPT threaded companion flange standard. 3" option available but must be ordered separately. (Order no. A1-3) 2" or 3" BSPP Connection (optional). Temperature: 1040F (400C) continuous 140OF (600C) intermittent. See order numbers on reverse side for specific HP, voltage, phase and RPMs available. 'ro ial head 12-( 11 Fully submerged in high grade turbine oil for lubrica- ton and efficient heat transfer. All ratings are within the working limits of the motor. 0 Class B insulation. - All single phase models feature capacitor start 'motors for maxim u m"sta rting torque. Single phase (50 Hz): * Built-in overload with automatic reset. * '/3 and '/2 HP — 16/3 SJTOW with bare leads. * % to 11/2 HP — 14/3 STOW with bare leads. Three phase (50 Hz): Overload protection must be provided in starter unit. % and 1/2 HP — 14/4 STOW with bare leads. 0 Designed for Continuous Operation: Pump ratings are within the motor manufacturer's recommended working limits, can be operated continuously without damage. .0 Bearings: Upper and lower heavy duty ball bearing construction. 0 Power Cable: Severe duty rated, oil and water resistant. Epoxy seal on motor end provides secondary moisture barrier in case of outer jacket damage and to prevent oil wicking. 20 foot standard with optional lengths available. 0 Motor Cover 0-ring: Assures positive sealing against contaminant and oil leakage. GDulds Pumps is ISO 9001 Registered. METERS FEET 7-W�157"BHF.- L_1�_ SERIES: 3887ZBHF! 54 SIZE: 2' SOLIDS 1 RPM: 2900 50 HZ I r it; . �_: ENCLOSED IMPELLER 15- 48 ! ! ­-E:1oJ- 10 GPM ------ 3 Fr 42 J VVS07,13HF1 36 1'-*�---_!----�-- 7— -7 < 10- 30 �WS05:13HF- 24 7 18 WS03-8HF___ J 6 OL 0 L GPM 0 30 60 90 120 150 180 210 240 L L 0 10 A 'A m3/h 20 30 40 50 CAPACITY L�.Tornr cafWLCA 3f as- <& iTT COMPONENTS FOR REFERENCE ONLY item No. Description I Impeller 2 Casing Silicon carbide vs. 3 silicon carbide Mechanical sea[ 4 Shaft 5 Motor 6 Ball bean'nqs 7 Power cable 8 O-ring . 7 --t YA1, HE V7 4 2 5 6 8 NOTE: Re fropair parts may be ordered m repair parts list. DIMENSIONS (All dimensions are in inches. Do not use for construction purposes.) ROTATION 6 I/V 19" K t63/4" 73/4 - -7-L-L MODELS Order No. - P Volts Phase RPM Impeller Diameter Max. Amps Wt. (Ibs.) WS0329BHF 220 1 2900 31/16" 6.7 63 WS0346BHF 380 3 1.7 63 WS0529BH 1h 220 1 3 'A 6" 7.8 65 WS05468HF 1 380 3 2.0 1 65 1 WS07298HF 1220 1 3"/,,' 9.4 70, W50746BHF 380 3 2.7 70 WS1029BHF 220 380 1 3 V 133 75 3.4 75 WS1529BHF 11h 1 . 220 380 1 1 3 1 4M 6 17.0 80 d8 IWS1546BHFI 4.8 0 Complete System Components available in the accessory section of this catalog. GOULDS PUMPS Wast6water 1/15/08 12:30.:7.am page 316 Walnut Street Trench Drain Flows - 000 Sr Drt'vexv,�( BASIN SUMMARY BASIN ID: B100D NAME: 100 YR 24 HR, TRENCH DRAIN SCS METHODOLOGY. TOTAL AREA ....... : 0.02 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV PRECIPITATION .... : 3.00 inches AREA..: 0.00 Acres TIME INTERVAL .... : 10.00 min CN.... 0.00 TC.... 0.00min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.01 cfs VOL: 0.00 Ac-ft TIME: 500 min BASIN ID: B10D NAME: 10 YR 24 HR SCS METHODOLOGY TOTAL AREA ....... : 0.02 Acres BASEFLOWS: cfs RAINFALL TYPE .... : TYPE1A PERV PRECIPITATION .... : 2.00 inches AREA..: 0.00 Acres TIME INTERVAL .... : 10.00 min CN.....: 0.00 TC.... 0.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.01 cfs VOL: 0.00 Ac-ft TIME: 500 min IMP 0.02 Acres 98.00 6.30 min IMP 0.02 Acres 98.00 6.30 min BASIN ID: B2D NAME: 2 YR 24'HR DEV-TRENCH DRAIN SCS METHODOLOGY TOTAL AREA.... *** : 0.02.Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE.... : TYPE1A PERV IMP PRECIPITATION-,.: 1.50 inches AREA..: 0.00 Acres 0.02 Acres TINE INTERVAL.... 10'.00 min CN.... 0.00 98.00 TC. . 0.00 min 6.30 min ABSTRACTION COEFF: 0.20 PEAK RATE: .0.01 cfs VOL: 0.00 Ac-ft -TIME: 500 min Pdo Si'a, t y7q V/S/108 to accorviodate flows f*rorvl deja�je-d re I ea s e Cro m 1,00 yr . S fo rw, Pea. I(- � F to W o - ( c, Froyv, w,ter tAjoy-ks 1,TOTPL HEqD DF:: TER M'tN'/i-T[6 Length O� 40 _PVC 2- 0 One ctO6 St-andro-d Elbow - ElYi Va(emi- Len . q f A o( 11 Aq (v e - 0,&-r) Elyivalefif- Len o� 2 Check- 'UatLe 0 LF 'COMVEU C�3 -F0 Peak F(ovv 100 Yr 0, C-FS C on vers iarl 7.+8. Et2 5ec 0- , 7, *9 '�� -:7 57 4, 5 Pomp Ar fVs may. , m m c har-f (,Cf 104, . head in ' &-ef- p e4-' 7oo L:F 11 _!�CA Ajo PVC p IP& � (3 5- adz 006 x &0 Ft PFrt!m ttead Loss Ele, Vo f-�vn DlkFkmri,�e i�rvrn Pory �0 00f-ra To ial Head , 0 (2 r&- Fofihn I H ea 5'0. 7 %7 32 Yo to me-. — x 4S-�C 6ould5 Por?lf),. L-i So 32 11311::7, 113 HP 7.4-8 6,qltons per 7, 1 From ro Data Pev-�-rrnqnce Rcd�yVs -�h&, jpm 1�. 3pm 12 head 93,12L ryl(n Mi f_e. ok 9 prn CARRYING CAPACITY AND FRICTION LOSS FOR SCHEDULE 40 THERMOPLASTIC PIPE (independent variables: Gallons per minute and nominal pipe size O.D. Dependent variables: Velocity, friction head and pressure drop per 100 feet of pipe, interior smooth v 0 A M 22 02. -&&F Z r CC2 T C,C, Z 2 ;:�s�;&.O��;j ;V C M -0: Z ca Z -'M10A 0 rA m1w.Z 1:0 Z �..Z 77, Z C) C, Z. M CT M f) b Z Z' ;C, .0 C. 0 14. 112 IN. 3/4 IN. I IN. 1-1/2 IN, 2 IN. 2-1/2 IN. 3 IN. -1 1.13 2.08 0.90 0.63 0.51 0.22 2 2.26 4.16, 1.60 1.26 1.02 0.44 0.77 0.55 0.24 0.44 0.14 0.00 0.33 0.07 0 1 5.64 23.44 10.15 3.16 6.73 2.48 1.93 1.72 0.75 1.11 0.44 0.19 0.81 0.22 .03 0.09 0.49 w 0.029 0.30 0,038 0.016 0.22 0.015 0.007 7 7.90 43.06 13 .64 4.43 10.52 4Z6 2.72 3.17 1.37 1.55 0.81 0.35 1.13 0.38 0.17 0.69 0.048 (1 .49 0.051 0.023 0.31 0.021 0.009 10 11. 28 82.02 35.51 6.32 20.04 8.68 3.86 6.02 2.61 2.21 1.55 0.67 1.62 0.72 0.31 0.98 0.21 D.091 0.68 0.09 0.039 0.44 0.03 0.013 15 4 IN. 9 48 42A6 18.39 5.79 12.77 5.53 3.31 3.28 1 * 42 2.42 1.53 0.66 1.46 0.45 0.19 1.03 0.19 0.082 0.66 0.07 0.03 20 0.51 0.03 0.013 12.65 72.34 31.32 7.72 21.75 9.42 4.42 5.59 2.42 3.23 2.61 1.13 1.95 0.76 0.33 1 .37 0.32 0.14 0.88 0.11- 0.048 25 0.64 0.04 0.017 5 IN. 9.65 32M 14.22 5S2 8.45 3.66 4.04 3.95 1.71 2.44 1.15 0.50 1.71 0.49 021 1.10 0.17 0.074 30 0.77 0.00 0.026 0.49 0.02 0 . OD9 11.68 46.08 19.95 6.63 11.86 5.13 4.85 .5.53 2.39 2.93 1.62 0.70 2.05 0.6a 0.29 1.33 0.23 0.10 35 1 0.89 0.08 0.035 0.57 0.03 0.013 7.73 15.76 6.82 5.66 7.36 3.19 3.41 2.15 0.93 2.39 0.91 0.39 ISS 0.31 0.13 40 45 1.02 1.15 0.11 0.046 0.65 0.03 0.013 6 IN. 8.84 20.18 8.74 6.47 9.43 4.08 3.90 2.75 1.19 2.73 1.16 0.50 1-77 0.40 0.17 0.13 0.056 0.73 0.04 0.017 9.94 25.10 10.87 7.27 11.73 5.08 4.39 3.43 1.49 3.08 1.44 0.62 1'99 0.50 0.22 50 1.28 0.16 0.069 0.81 0.05 0.022 0.56 0.02 0.009 11-05 30.51 13.21 8.08 1425 6.17 4.88 4.16 1.80 3.42 1.76 0.76 2'21 0.60 0.26 - 60 1.53 0.22 0.095 0.97 0.07 0.030 0.67 0.03 0.013 9.70 19-98 8.65 5.85 5.84 2.53 4.10 2.46 1.07 2'65 0.85 0.37 70 1.79 0.30 0.13 1.14 0.10 0.043 0.79 0.04 0.017 6.83 7.76 3.36 4.79 3.27 1.42 3'09 1.13 0.49 75 1.92 0.34 0.15 1.22 0.11 0.048 0.84 0.05 0.02 2 7.32 8.82 3.82 5.13 3.71 1.61 3.31 1.28 0.55 80 2.65 0.38 0.16 1.30 0.13 0.056 0.90 0.05 0.022 8 IN. 7.80 9.94 4.30 5.47 4.19 1.81 3.53 1.44 0.62 90 2.30 0.47 0.20 1.46 0.16 O.D69 1.01 0.06 0.026 - 8.78 12.37 5.36 6.15 5.21 2.26 3,98 1.80 0.78 100 2S6 0.58 0.25 1.62 0.19 0.082 1.12 0-08 0.035 0.65 0.03 0.012 9.75 15.03 6.51 6.84 6.33 2.74. 4.42 2.18 0.94 125 320 0.88 0.38 2.03 029 0.126 1.41 0.12 0.052 0.81 0.035 0.015 BS5 9.58 4.15 5.52 3.31 1.43 150 3.84 1.22 0.53 2.44 0.40 0.17 1.69 0.16 0.069 0.97 0.04 0.017 10 IN. 10.26 13.41 5.81 6.63 4.63 2.00 175 4.48 1.63 0.71 2.84 0.64 0.235 1.97 0.22 0.096 1.14 0.056 0.024 7.73 6.16 2.67 2W 6.11 2.08 0.90 3.25 0.69 0.30 2.25 0.28 0.12 .30 0.07 0.030 0.82 0.027 0.012 6.83 7.88 3.41 250 6.40 3.15 1.36 4.06 1.05 0.45 2.81 0.43 0.19 1.63 0.11 0.04a im o.o35 o.o15 12 IN. 11.04 11.93 SAT 300 1.67 4.41 1.91 4.87 1.46 0.63 3.37 0.60 0.26 1.94 0.16 0.069 1.23 0.05 0.022 350 8.95 5.87 2.55 6.69 1.95 0.85 3.94 0.79 0.34 2.27 0.21 0.091 1.44 O.M 0.028 .027 0.012 400 1023 7.52 3.26 6.50 2.410 1.08 4.49 1.01 0.44 2.59 0.27 0.12 1.64 0.09 0.039 1.18 0.04 0.017 450 Soo 7.31 3.09 1.34 5.06 1.26 0.55 2.92 0.33 0.14 1.85 0.11 0.048 1.30 0.05 0.022 8.12 3.76 1.63 5.62 1.53 0.66 3.24 0,40 0.17 2.06 0.13 0.056 1.45 0.06 0.026 750 _F00-0 0.43 3.25 1.41 4.86 0.85 0.37 3.08 0.28 0.12 2.17 0.12 0.052 -450.63- 1250 11.24 6.54 2.40 6.48 1 ' 4.11 0.48 0,21 2.89 0.20 0.087 1500 8.11 220 0.95 5.14 0.73 0.32. 3.62 0.31 0.13 noo 9.72 3.07 1.33 6.16 1.01 0.44 4.34 0.43 0.19 2500 8.21 1.72 0.74 5.78 0.73 0.32, 0.49 3000 3500 8.68 1.55 0.67 14000 111.07 10.12 2.07 0.90 2.88 1.15 0 X -n 10 Z Cl) IT! :5 0 > 0 M > 0 M > Cal - r- --i M -< (1) M 0 > ;U 0 00 Q 0 Z 0 0 0 (1) Cn -n 0 ;u 0CA m m m cn m 0 Cl do 4 -4& T 0 0 OF - r') 1 CY6 06 EL 31, �Z�Zzl CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building Engineering May 16, 2002 Mr. Brian Bums f-3ill91Wa41huhStr dft', Edmonds, WA Y9620 RE: Alley Obstruction at 318 Walnut Street Dear Mr. Bums, GARY HAAKENSON . MAYOR In response to your complaint dated January 7, 2002, the Engineering Division, Building Division and Police Department have been diligently pursuing resolution to the alley obstruction issue off Walnut Street. The following is a summary of our findings and planned actions: I . The motor home has been licensed and moved from the alley right-of-way to private property. 2. We do not plan to install "No Parking" signs in the alley. 3. Per requirements of the City of Edmonds Community Development Code, your neighbors have been requested to keep at least a ten foot clear travel lane in the alley. Access via the alley to all adjacent property shall be maintained at all times. 4. The regulatory 72-hour parking limit will be enforced and monitored by Edmonds Police Department. 5. We welcome the opportunity to meet with you and your neighbor to arrive at a mutually agreeable access and parking plan*. June 4, 2002 would be an acceptable date for this meeting. I understand you and your neighbors may have other civil issues that need to be addressed. I encourage you to contact Disputes Resolution Center of Snohomish County at 425-339-1335 or 1-800-280-4770. Please feel free to call me With any questions at 425-771-0220, Ext. 1328. 4.cerely, DARRELL C. SNHTH, P.E. Traffic Engineer DCS/cmc c: Jerry Kaczka, 403 Third Avenue South Terry and Sharon Dalton, 409 Third Avenue South Jason Tourtellot, Code Enforcement Officer Gerry Gannon, Assistant Police Chief David K. Gebert, City Engineer Jim Kammerer, Street Division Manager S:\ENGR\DARULL\TmfficConce=\Wainut Alley Letter.doe Incorporated August 11, 1890 Sister Citv - Hekinan. Japan 0 0 0�- CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,.WA 98020 - (425) 771-0220 - FAX (425) 771-0221 k_1 �� DEVELOPMENT SERVICES DEPARTMENT I -%%Rlmmw� �) Planning - Building - Engineering lic. Matelf-r5,-.2002 - Bri'an Bums ,318 Walnut Street Edmonds, WA 98020 RE: Connection to Storm Stub,Provided by Ci Dear Mr. B urns: GARY HAAKENSON MAYOR This letter is a follow up to our previous correspondence dated January 8 and January 18, 2002, regarding proper connection to the City stonn system. In late January, the.City of Edmonds, Street Division, provided a storm stub to your lot. As previously stated, you are required to mak e proper connection to the City's storm system. Please make connection to the stub provided to your lot. The following is a list of approved tightline materials: • SDR35 (ASTM D-3034) PVC • N-12 ADS (DOUBLE WALLED) • SCHED 40 PVC 0 HANCOR(F81O)PVC. Please call 771-0220, Ext. 1326, for an Engineering inspection of the connection, prior to backfill. Inspection must be called for prior to March 29, 2002 in order to prevent further Code Enforcement action. Sincerely, DON FIENE, P.E. Assistant City Engineer DF/JM/cmc D:\MyDocunients\Engsec�DEVELOP\JeanieL&Ueri\318walnub."corporated August 1], 1890 Sister Citv - Hekinan. Jar)an ), � 1) r2c. 189 January 18, 2002 Brian Bums CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering 3�10W-ailnut-:Strleet- � Edmonds, WA 98020 RE: Connection to City Storm System in Alle Dear Mr. Bums: GARY HAAKENSON MAYOR This letter is to follow up our phone conversation on January 10, 2001, regarding the drainage problems you are experiencing at your site. At present, the City does not have plans to change the layout of the alley. The City of Edmonds Street Division will, however, provide a storm . connection from the catch basin in the alley to your property. As stated in the correction notice, posted January 8, 200 1, you will be required to make proper connection to the City's storm system. You will no longer be required to obtain a right-of-way permit, as all work in the right- of-way will now be performed by City crews. Prior to January - 31, 2002, please either remove the hose and tightline currently draining to the City catch basin or contact Tod Moles, Storm Lead for the Street Division, to coordinate the installation of the stub to your lot. in order to prevent further Code Enforcement actions. You may reach Tod at 425-771-0235, Ext. 1640. Sincerely, DON FIENE, P.E. Assistant City Engineer DCS/cmc GAENGRVEANM\Con-mWnde=\318 Walnut-stormdm a Incorporated August 11, 1890 0 Sister City - Hekinan, Japan R '22= CAt+T'jLCVMr--l7-) 3>E-C--� 97 U 13 ,ITY OF EDMONDS KJILDING DEPARTMENT wor4ff ADDP-r-.Ss OWNER ...... APPROVED DATE: 10-3 BLDG. [P[SERMOT -//3 AA 14 — A/ 6/7 APPROVED 13Y PLANNING -fXAl i CITY COPY . . . . . . . . . . ................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............. ................... . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPRAISAL DIATA DEPUTY :W REMARKS: 75 -R4&ja-.. NON C-OwrOP� lh4 L'al F��. PVhL,ZoNe :74 2.0 A Z. -PCC4 -1-0 —be- C,(A,7— -EAcf4- TO . & t�. APPROVED BY PLANNINP. .P6ttH4i- DeM- fg-Dt ' 6- AT14446D -FH0705 q:b4 t� rl 4.7 "pt 4 kIC ISM Nit" Rip 0 Drawing The ON of Edmonds EASEMENT NO . ............................................ NEW CONSTRUCTION E] REPAIRS R LID NO . .................. ASMT. NO... � ............... OWNER------------------------------------------------------------------------------------------------ CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO . .................... JOB ADDRESS ...... (�>.T--- uc. -------- ---------- I Al DESCRIPTION: LOT NO . ...................................... BLOCK NO . ........... I' r 7- c -i (f, 4 P. PcbL.(L P. VAu LT PWW-0001-11/75 PIPE- 0 COUPL104G - u cc V fL �REV. 11/78) ------------------------------------------------------------------------------------------------------------------------------------------------ ................. NAME OF ADDITION `3 1 S WAL-N u-r -3/4�'C-OPPEQ APPROY- 2,' DEf-P Approved: DATE,,,Zg ....... ... 9 --- 9 ... 3.. By ------------------------- APPLICATION for The CitY of Edmonds SIDE SEWER PERMIT NEW CONSTRUCTION C) REPAIRS EASEMENT No . .......................................... 10 jn-o�c)n OWNER.... Land ------ J?cn ................................................... CONTRACTOR ....................... ................................................... ---------------- ..... PERMIT No . ...................... ADDRESS W . ............................................ LEGAI, DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ NAME OF ADDITION JUAC, /q,7a DYq- Teskd On 6,zKcr Approved: DATE................................................ By ...................................................................... 0 CITY OF EDMONDS GARY HAAKENSON MAYOR i21 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT ; . 0 NA; . C. ; r- lann ng U "K "6 MU1 Hs qQ1 March-15�*2002 Brian Bums Slf?EETFILE 318 Walnut Street Edmonds, WA 98020 RE: Connection to Storm Stub Provided by City Dear Mr. Bums: This letter is a follow up to our previous correspondence dated January 8 and January 18, 2002, regarding proper connection to the City Storm system. In late January, the City of Edmonds, Street Division, provided a Storm stub to your lot. As previously stated, you are required to mak e proper connection to the City's storm system. Please make connection to the stub provided to your lot. The following is a list of approved tightline materials: SDR35 (ASTM D-3034) PVC N- 12 ADS (DOUBLE WALLED) SCHED 40 PVC HANCOR(F81O)PVC. Please call 771-0220, Ext. 1326, for an Engineering inspection of the connection, prior to backfill. Inspection must be called for prior to March 29, 2002 in order to prevent ftirther Code Enforcement action. Sincerely, DON FIENE, P.E. Assistant City Engineer DF/JM/cmc D:WyDDcun,entsXEngscc\DEVELOP\JeanieLencrs\31BWainut.dklcorporated August 11, 1890 0 q;c+ar ri+iy - 1-4zPWn;%n JnnAn CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98090 - (425) 771-0220 - FAX (425) 771-0221 DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering January 18, 2002 Brian Bums 318 Walnut Street Edmonds, WA 98020 RE: Connection to City Storm System in Alley Dear Mr. Bums: GARY HAAKENSON MAYOR This letter is to follow up our phone conversation on January 10, 2001, regarding the drainage problems you are experiencing at your site. At present, the City does not have plans to change the layout of the alley. The City of Edmonds Street Division will, however, provide a storm connection from the catch basin in the alley to your property. As stated in the correction notice, posted January 8, 2001, you will be required to make proper connection to the City's storm system. You will no longer be required to obtain a right-of-way permit, as all work in the right- of-way will now be performed by City crews. Prior to4anuary 31, 2002, please either remove the hose and tightline currently draining to the City catch basin or contact Tod Moles, Storm Lead for the Street Division, to coordinate the installation of the stub to your lot. in order to prevent further Code Enforcement actions. You may reach Tod at 425-771-0235, Ext. 1640. Sincerely, DON FIENE* , P.E. Assistant City Engineer DCS/cmc GAENGRVEANMC0ff=pon&=%318 Walnut-stwmdm 0 Incorporated August 11 " 1890 Sister City.- Hekinan, Japan .� J7. c. 18 () 13 MOTIC TO PERMITTEE AND/OR OWNER Ej PARTIAL APPROVAL La VIOLATION 5f" ShLb Q('� anyle-fe- bV 'Ptt'bll� wo-f's. .Wj CORRECTIONS REQUIRED Permit Number Owner Job Address 5/,q W,4LAjW-r No PERMIT -STOP WORK -REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMPLY Lj WITH ALL APPLICABLE CITY CODES. F-A CONSTRUCTION Is NOT IN ACCORDANCE WITH APPROVED PLANS AND PERMIT - STOP WORK. MAKE WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE. FA STOP WORK - UNTIL AUTHORIZED To CONTINUE By CITY INSPECTOR. FA CORRECTIONS LISTED BELOW MUST BE MADE: BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE IS STARTED; To AVOID POSTING OF A STOP WORK ORDER, ORDER To CORRECT, OR ABATEMENT PROCESS. F-1 JOB CARD MUST BE POSTED ON SITE AND BE VISIBLE FROM STREET. LjAPPROVED PLANS MUST BE AVAILABLE To INSPECTOR ON SITE. WORK DESCRIBED BELOW HAS BEEN INSPECTED AND Is APPROVED. CONTACT INSPECTOR AND ARRANGE FOR APPOINTMENT. 71 RECALL FOR INSPECTION. M WYL I W, Tf. rf 0, 'A WRTA MAW Rl" All Zi A A n- WT AF � FA IN; U. #12AN THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR PENALTIES MAY BE APPLIED. FOR INSPECTIONS CALL 425-771-0220 F-1 F" Building Division Planning Department, /J'QrJ Engineering Department LJ Fire Department CITY OF EDMONDS 11(0 N Inspector Date 1� 1 p 13 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website: wwaci.edm6ndsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering , February 28, 2007 Mr. Rob Michel Michel Construction, Inc. 7907212 1h Street SW # 102 Edmonds,WA 98026 GARY HAAKENSON MAYOR STREET FILE RE: Installation of Fire Line and 2 Inch Domestic Connection — 320 Walnut Street Dear Rob: The City has awarded a capital project construction contract that will include installation of new water main along Walnut Street from 3rd Avenue S. to 4th Avenue S. You have requested that, during the installation of the City's water main, we have the contractor install a new 4 inch fire line and 2 inch domestic line per City of Edmonds Standard detail E 7.18 (and as shown on the enclosed drawing) to the property that you plan to develop at 320 Walnut Street. We agree to have our contractor install the fire/domestic connection as requested, provided that you submit payment to the City, prior to installation of the connection, to cover the estimated full cost to the City of this additional contract work, including the City's administrative cost. The estimated cost for the fire/domestic connection installed under the contract, based upon the contract unit prices and estimated quantities, will be $6,933.94 including sales tax, as indicated in the enclosed cost breakdown. We will also require an additional 15% to cover the estimated amount of the City's administrative costs. Therefore, the estimated total cost to you will be $7,974.03 as follows: • 1 Fire Line and 2 " Domestic Service Connection $6,367.25 • Plus: Sales Tax (8.9%) $ 566.69 • Subtotal $6,933.94 • Plus: 15% City Admin Cost $1,040.09 • Total $7,974.03 j The $6,367.25 amount is based upon the contract unit prices and estimated quantities. It assumes that no unforeseen conditions are present for your fire/domestic connection installation such as dewatering, which we believe will be the cage. However, if any unforeseen conditions are discovered directly affecting the fire. and domestic line installation, or if the actual quantities are greater than those estimated, it will increase the contract cost to the City based upon the contract unit prices and actual quantities installed for these items, and you will be required to provide additional payment in the amount of Incorporated August 11, 1890 0 � q;.f— 1-;+., - .1-- the additional contract cos - t for these items plus 15% for City administrative cost. Likewise, if the actual quantities installed are less than the estimated quantities such that the contract cost to the City is less than the estimated cost, we will provide to you a refund of any overpayment. The fire and domestic connection to be installed will include all parts listed per City of Edmonds standard detail E 7.18 including stubbing the 4 inch and 2 inch lines to the right-of-way/property line, traffic control, shoring, restoration and connection to the City's water main in Walnut Street, for future connection of the structure you plan to construct on the lot. Upon installation, the fire and domestic water lines from the water main to ' the edge of the right of way will be owned and maintained by the City. In addition, the City's standard water connection charge and other applicable fees willl still be required. If you want the City to install the requested fire and domestic lines to your property, please submit a check made payable to the City of Edmonds in -the amount of'$7,974.03, with a cover letter confirming your understanding of the above conditions, addressed to Mr. Duane Bowman, Development Services Director, prior to March 7, 2007. Also, please return the enclosed drawing with the specific location along Walnut Street annotated as to where you want us to install the fire and domestic lines. It will be most helpful if you identify the location as a specific dimension from a distinctive surface feature, such as face of curb, survey monument, etc. If you have any questions, please don't hesitate to call Pam Lemcke or me at 7710220. TFAVID K GEBERT, PE City Engineer Cc: Duane Bowman, Development Services Director Noel Miller, Public Works Director 9 0 SCHEDULEF 2005 Waterline Replacement Project City of Edmonds E5JA/c1 83 Interwest Construction, Inc. Change Order #2 80th PI W. - Sierra Drive to end of Cul cle Sac, Services Only Walnut Street 3rd Ave to 4th Ave CONTRACT/Change Order Item QtY Unit Description Unit Price Total Price 1 1 LS Traffic Control $ 17,000.00 $ 17,000.00 2 1 LS Shoring and Safety $ 3,000.00 $ 3,000.00 3 1 EA 8" x 8" Tee $ 550.00 $ 550.00 4 7 EA 8"RSGV $ 790.00 $ 5,530.00 5 1 EA 4"RSGV $ 590.00 $ 590.00 6 2 EA 8" x 4" Tee $ 500.00 $ 1,000.00 7 1 EA 8" x 8" Cross $ 1,200.00 $ 1,200.00 8 1 EA 8-inch MJ Plug $ 200.00 $ 200.00 9 1 EA 2" RSGV $ 390.00 $ 390.00 10 350 LF 8-inch Class 52 D.I.P. $ 32.00 $ 11,200.001 11 1 33 1 LF 4-inch Class 52 D.I.P. $ 27.00 $ 891.00 12 1 LS 2-Inch Domestic Parts $ 1,600.00 $ 1,600.00 13 380 LF Import Backfill for 8-inch D.I.P. $ 2.00 $ 760.00 14 380 LF Import Base for 8-inch D.I. P. $ d. -25- $ 95.00 15 4 EA 3/4" Service - short side $ 450.00 $ 1,800.00 16 9 EA 3/4" Service - long side $ 850.00 $ 7,650.00 17 1,266 SF Tempora Cold Mix Patch $ 2.00 $ 2,532 .00 18 1,266 SF Class B Trench Patch 2" Depth $ 2.20 $ 2,785.20 19 13 EA Water Meter Assembly $ 380.00 $ 4,940.00 20 2 EA Special Connection $ 3,000.00 $ 6,000.00 21 1 LS I Restoration - 80th Pl. $ 3,000.00 $ 3,000.00 22 18 CY lControl Density Fill 1 $ 80.00.1 $ 1,440.001 Subtotal $ 74,153.20 8.9% Tax $ 6,599.63 TOTAL SCHEDULE F TOTAL $ 80,752.83 Item Qty Unit Description Unit Price Total Price 1 0 LS Traffic Control $ 17,000.00 $ 2 0 I-S Shoring and Safety $ 3,000.00 $ 3 0 EA 8" x 8" Tee $ 550.00 $ 4 2 EA 8" RSGV $ 790.00 $ 1,580.00 5 1 EA 4- RSGV $ 590.00 $ 590.00 6 2 EA 8" x 4" Tee $ 500.00 $ 1,000.00 7 0 EA 8" x 8" Cross $ 1,200.00 $ - 8 0 EA 8-inch MJ Plug $ 200.00 $ 9 1 EA 2" RSGV $ 390.00 -- $ 390.00. 10 0 LF 8-inch Class 52 D.I.P. $ 32.00 $ - 11 33 LF 4-inch Class 52 D.I.P. $ 27.00 $ 891.00 12 1 I-S 2-Inch Domestic Parts $ 1,600.00 $ 1,600.00 13 33 LF Import Backfill for 8-inch D I.P. $ 2.00 $ 66.00 14 33 LF Import Base for 8-inch D.I. P. $ 0.25 $ 8.25 15 0 EA 3/4" Service - short side $ 450.00 $ 16 0 EA 3/4" Service - long side $ 850.00 $ 17 0 SF Temporary Cold Mix Patch $ 2.00 $ - 18 110 SF Class B Trench Patch 2" Depth $ 2.20 $ 242.00 19 0 EA Water Meter Assembly $ 380.00 $ - 20 0 EA Special onnection $ 3,000.00 $ - 21 0 LS I Restoration - 80th Pl. $ 3,000.00 $ - 22 0 CY lControl Density Fill $ 80.00 $ - Subtotal $ 6,367.25 8.9% Tax $ 566.69 TOTAL ROB MICHEL TOTAL $ 6,933.94 SAE�GR\CAPITAL PROJECTS\E5JA 2005 watermaiMproject spreadsheetsIChangs Order 2 Spreadsheet for RobAs CMC BRICK SLFP13RT Fl. X FL X 4' TEE mm House #325 0 MAIN NJ FIL X NJ RSGV FLANGE VITH 2' FIPT THREAD CTYPICAL) 2- V BRASS STREET ELLS 4' FL X KJ RSGV - 3' BRASS NIPPLE MIPT RSGV (FlP.T. X FIP.T.) BRASS- KEPT x CTS PAC JBINT (IF CUPPER) 0. -MIPT x IPS PAC JOINT (IF PM_Y) Ld 217 w S TA. 3f w w w w _w _w Vik,r jr __IF'NL 8 DIP STA 2+81 2 8" RSGV FL X MJ .1 4" RSGV FL X MJ 1 2" RSGV FIPT X FIPT 2 8" X 4" TEE FL X FL 2 8" LONG BODY COUPLING 6 LF 8" DIP 2 — CONC THRUST BLOCKS ROW SEE COE DETAIL E7.18 TERMINATE AND CAP AT ROW 320 WALNUT w I STA 3+50 " RSGV FL X FL A16' lo,,�l I 1 1 8" RSGV FL, X MJ w IF 1 8" X 8" CROSS FL X MJ 2 8" LONG BODY COUPLING 1 8" PLUG X MJ 6 LF 8" DIP - 3 — CONC THRUST BLOCKS SEE COE DETAIL E7.9 FOR BLOCKING REQUIREMENTS 00 I- 2' -5/8' CSTC Ld L'i Of z -c U Ld u L) 0 -J _j D P4 im 14 u Ld 0 z LJ m rk CONC, BRICK SUPPORT MI . N. FLX FLX4' A TEE 3' MIN, MJ X A/ MJ D.I. LONG BODY COUPLING I G MAIN mi FL X MJ RSGV--�i (TYPICAL) 4' FL X MJ RSGV Ck. 2 -J w 940 STYLE CAST IRON VALVE BOX AND EXTENSION ACP SURFACE - MATCH THICKNESS <3' MINIMUM) NOTE, WCDF SHALL BE :Y4 SACK MIX DESIGN PER WSDOT STANDARDS T INSTALL 12' RIBBED PVC PIPE (ASTM D-3034) WHEN USING CDF BACKFILL ONLY FOR ALL VALVES) 0 MAIN 9 I WATER MA w CL IL Ll D D ---BLIND FLANGE WITH 2' FIPT THREAD -- 2' BRASS STREET ELLS 1- 3' BRASS NIPPLE MIPT 2' RSGV (F.I.P.T. X F.I.P.T.) 2' BRASS- MIPT x CTS PAC JOINT (IF COPPER) 2 2' 3 1 2. 1 -MIPT x IPS PAC JOINT (IF POLY) u TH 2' HI-MOL POLY (160 PSI) A 2' STAINLESS STEEL, STIFFENER AND w 2' MIPT X IPS PAC JOINTS REQUIRED (S (SEE WATER SERVICE STD DETAIL E-7.6.1) C3 p - uo C [INC. BRICK SUPPORT NUMBER OF BRICKS REQUIRED DEPENDS ON AMOUNT OF OVER EXCAVATION -0- C.-I-TY REVISIONS AMROVED BY DATE STANDARD D ETAI L D. GEBERT 8/17/06 FIRE LINE AND 2" DOMESTIC SERVICE CONNECTIONS (DETAILS) DATE SCALE I N 07/12/05 NTS E7.18 IWO O-ol = I 1%-aoi4 . -3,1 tf IDS STRE�-- cT FILE Wei 'law QL 'T -3 -11 C) Y, 0 -LnN-Ivm C ?V tp aid �D-r P FILE CITY OF EDMONDS APPLICATION FOR ARCHITECTURAL DESIGN BOARD OWNER/REPRESENTATIVE DATE 5/tpqrx FILE # AVB-G;I-% SITE PLAN --" SIGN EXHIBITS BUILDING PLANS (3): ELEVATIONS LANDSCAPE PLAN w-�' ENVIRONMENT —DATA FEE RECT # PLAN MODIFICATIONS, 7 FILE # HEARING DATE 0 ARAW lt�lckeLl PHONE 7 75-,44 8�) ADDRESS. �?-/O/O 76-�� hV-r-- U), ah'�L -ZIP CODE, ARCH I TECT/ DESIGNER ;4�elA_t 1'(111C4e L_ PHONE -7'7_,5;:-44e0 ADDRESS. A'4� 1z,), ZIP CODE yyx�dp PROPERTY ADDRESS- 3 2_0 _ZONING_2eA'1 ';Lv LEGAL DESCRIPTION PLANS SUBMITTED FOR APPROVAL: 1 Building Plans - Preliminary _ Final )< Site Plan Landscape Plan X Elevations- )( 2. Sign Elevations AtIA- Site Plan x Landscape Pla_n__�< 3. Modifications of previous approval EXISTING USE OF PROPERTY pAzq;z_>� I - DESCRIPTION OF PROPOSAL 7v­�tWal-V_, 11V' Z-07- 7-0 JGkA-7_11)& Zze�?�O APPROXIMATE DATE WORK WILL BEGIN ON PROJECT ESTIMATED TIME FOR COMPLETION OF WORK. 4 — RELEASE/HOLD HARMLESS AGREEMENTS: The undersigned applicant, his heirs and assigns, in consideration for the City processing the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages and/or claims for damages, including reasonable attorney fees, arising from any action or inaction of the City whenever such action or inaction is based in whole or in part upon false, misleading or incomplete information furnished by the applicant, his agents or employees. PERMISSION TO ENTER SUBJECT PROPERTY: The undersigned applicant grants his, her or its permission for public officials and the staff of the City of Edmonds to enter the subject property for the purpose of inspection and posting attendant to this application. r- APPADBI/PFORMS / Vgnature of Applicant 2. c ii PPC) AUG 3 0 1988 ,"ERMIT COUNTER .5.) Muk�\ LA� -rAc- -F (Pe, I'A) 6 WALAWF CM�6T- v c- DRAINAGE PLAN cf) q :33 m -n r� m The City of Edmonds Side Sewer Drawing EASEMENT NO - -------------------------------------------- lol-04700 NEW CONSTRUCTION E] REPAIRS [I LID NO - ------ ----------- - ASMT. NO. ----------- OWNER -------- I -VAR --- all-LLIVAH ---- --------------- ------------------------------ CONTRACTOR - ---------------------------------------------------------- ----------------------- PERMIT NO. jOB ADDRF ,SS ....... 3aQ..- WALNUT STREET - --- ----- --------- --------------------------------------------- LEGAL DESCRIPTION: LOT NO. - ----------------------------------- BLOCK NO. --------- uj A-- LU ui cc W NAME OF ADDITION ............... --------------------- DYE TESTED ON SEWER Approved: PWW-OWl-11175 (REV.11178) DATE -------------------------------------------- By ------------------------------------------------------------ I -3 a 0 W A L. JW T � R 0 T-Er Cl' -r k? - �ls-- r t A-T�%- Avia, Cp,.o&4 SEc,-riooj-s 0 STR'E--T i' :u ;: SCAL FL * 15LSJ. I ItVL- SIE\I. tk� //S 8 90 . 19 ') STREET FILE CITY OF EDMONDS 250 - 5th AVE N. -EDMONDS. WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works e Planning * Parks and Recreation * Engineering March 15, 1989 Mr. Mark Mehlhoff 320 Walnut Edmonds, WA. 98020 Dear Mr. Mehlhoff: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR I have tried to research City Codes and policy thoroughly regarding your property at approximately 8th and Sprague. You would be allowed to access over undeveloped 8th Ave. from Daley St., but you would need to make all necessary improvements to the public right-of-way, including 20 feet of asphalt paving per City standards. Any necessary rockeries or retaining walls would have to be built at your expense. If you choose to access the property from the alley, you again would have to improve the right-of1way to City standards. The standards, in the case of alleys, vary according to the number of units to be served. I will be glad to provide you with the information after you decide how many houses you will, have accessing the alley. You should also note one of the requirements of the short plat S-2-82 is that an on -site vehicle turnaround is required on each lot. I trust I have answered all of your questions, Mark, but if I can be of further assistance, do not hesitate to call. Very truly yours, GORDON C. HYDE Engineeri,.ng Coordinator, GCH/sdt MEHLHF2/TXTST530 Q:2 Alberts 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan I 8 9 0.19 9 CITY OF EDMONDS ' 250 - 5th AVE N. * EDMONDS. WA 98020 o (206) 771-3202 cbmMUNITY SERVICES: Public Works e Planning e Parks and Recreation e Engineering March 20, 1989 I -?M STRE-L"'I FILE Mr. Mark Mehlhoff 320 Walnut St. Edmonds, WA. 98020 Dear Mark: LARRY S. NALIGHTEN MAYOR PETER E. HAHN DIRECTOR As I indicated in our conversation on Friday morning, any improvements required to be made in public right-of-ways must be completed before certificates of occupancy can be issued. This is not to imply that you could not construct a temporary access across or through a public right-of-way prior to or during home building. My letter of March 15 indicated that paving width would be 20 feet. Following a meeting with my supervisor, we have determined that you would be allowed to pave 16 feet only plus a 1 1/2 foot thickened edge, as long as 20 feet of clear distance was provided. For clarity, please see attached drawing. If you have further questions, do not hesitate to call. Very truly yours, GORDON C. HYDE Engineering Coordinator GCH/sdt Attachment Alberts MEHLHF3/TXTST530 " Incorporated August 11, 1890 * Sister Cities International — Hekinan, Japan I-M -d2LjJI)9Ig-a.-)--;, CLI-- -T 22-141 50 SHEETS OIL . 22-142 100 SHEETS 22-144 200 SHEETS QCO-J/rKn- 2-a L�2 ry " -V,, 2,tl,3. CU9 Nsn'AD. 1:2N I A. VJ, 91 /00 r C2 i S N-�- I Y--? --La�a-2J-1 S H-La Ll :Z�j ,,I 0 Lo r ST -RE""T F-1- 0 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 107 COMMUNITY SERVICES DEPARTMENT q2w Public Works e Planning e Parks and Recreation * Engineering 8 9 0 Q$ December 7, 1994 Mailed 12/8/94 Mike McCann 6114 - 185th Pl. S.W. Lynnwood, WA 98037 Re: Right-of-way invasion corrections at 320 Walnut Ave. Dear Mr. McCann, LAURA M. HALL M AYOR This letter is a follow-up to the on -site inspection and our previous telephone conversations with regards to the subject corrections. The fill material has been moved back to the edge of the road surface, sloped properly and reseeded,. All work associated with removing the fill from the road, thus reestablishing previous road width, resloping and reseeding has been accomplished to the City's satisfaction. If you have any questions, please call me at 771�0220. Sincerely, - 4�� ADDISON L. CBRISMAN IV Engineering Inspector ALC/sf . apA� Wa!?ker MCCANN.DOC e Incorporated'August 11, 1890 * Sister Cities International — Hekinan, Japan A MICAEL t. �,e-uc-E M�M � �. E-. IZ umiT APT 3ao 'WALNUT RP, 13 3 P, A TIOA-,� iFssl SITE �lj_pM s P1 Up IC14L- L S I T6- IS CUReEzAl-rZ-�- bEV,6L(oP4r4 -A L L -- C- T S, -rO oe m w A -rF A, -r zF / -r /-s 7o e5-XfS'rl Aj 6, ClAlrett eAC.IAI 0,0i T Y, aP7 M 0 tJ6 -5 c�A16 P- FAJ 0 -rE7 5 L)d 6,FS-rS U -rl AJ 6- /,AJ,4 (9 -&- )A=4 0 LAJ m E-7 y IoA A14 E 4 -rff AvE7 opF- SI-rE Amo Ackoss WA t-A) u r 4 jr. //,J/7-/,41- 9,AJAL-7-SI.5 ASSUMES FYePIV4,�c4 47-P ills PAR T -r Y 7o- 9c P CIZ, 0) o. --5� (AAQ.) 11Z 9,4 01- A U e, r!-- k 2--hA [7. Yt -k- V 1 0, rT '17 -- e -.Op-r a 3 -act 04- OSE- Ar\j A L �r 1-5 o S TeFE, /VoT 6 3 7 4 ;t s— -4 \Js 7,5-1 S-0. - nal- I Is -7 7 rP (C Fl- o I ct3 'foe. 1740�__q COLUMBIA LAND SURVEYING & ENGINEERING Tom Reisdorff, P.L.S., P.E. 6605 228th S.W. Mountlake Terrace, Wa. 98043 776-3935 STORM WATER DETENTION SYSTEM CALCULATIONS for PROPOSED 3-UNIT APARTMENT BUILDING at 320 Walnut St. on Ptn. SE 1/4, SE 1/4 23-27-3 CITY OF EDMONDS Existing Site Information Area 0.16 Acres, Off5ite are; - 0.06 Slope - 8 % draining toward the West side of property Ex. ground cover: bare dirt Tc L/(VxSO) + 10 = 130/(3.00x6O) + 10 - 10.8 min i 1.65 in/hr Sno. Co. 10yr Gallowable - cia 0 x j"6'5* X 9'2-z'= 0 .-2-M c f 5 .411 1.9 -:31 zo& Required volume of detention for this development: future runoff coefficient: Apartment dwelling area: C = 0.8s Go = Gallowable/(CxA)= 0.2.36 / (0.8S x 0.22)= J-r2t-cfs/Ac QW,= o, 4-74k, Assume orifice conditions eXi5t: T - -25 + \/225S/Qo -25 + \/2255/1.26'= J-7-3 V7.40q Vs = 3607T/(T + 25) 400oT = 3607xl7.3/(17.3 + 25)-40xl.26xl7.3 =6e'Ccf/ac C V =604 x0.22xO.85=1-��cf storage volume required Storage provided by 60 LF of 18"*CMP pipe -106 cf Storage'provided by 2 catch basins - 7 cf 113 cf . total provided Or if i.ce: ' 0' 2-6,6, 0 - CdA\/j�� A = +-.m431(@.63x\/�2x32.2x3 A = 0. 14 sf � ::: -3 . co - e usejt::F�diameter orifice 6utlet to the storm sewer adjacent to this project on Wal'nut St. Assuming the grate elevation of the re5trictor catch basin is I' above the top 'of the riser and an underground detention system by extrapolation, a 10" riser Will be I&t ­11 I 'i 11 � - � I � 11 ­ I ­ �­. I - I I I ­ � .1 I I I � , I I , ­ ­11 � I ­­ I ­ ' I -11 ­_1_­""" . " " , " _­ , - , , , , , , -, - " ­'. ­­ -, ­ ... � "-, � � .1- - 11 I 1­1 ­11 11­'_"___ __ �, - "I ­ 1_­__1_­1__­ "­ _'.____­1 I - I "I � , , , I " 7'7�,�,�,",',,��,,-""I'��,�,'�"", " `,'7 � ',' " ',, , ­- � '; "-, --- , I , I - I I -, I �' ',- 777 ,', -­ , - - ',',""I """""""'� i:-"� I "': ' :�"' '�"_' �� ;-" � "'�'�""""":­"'_­ " -"'""""-""","""7- _'___ ' , I - - - I , � 1, "I I I e I 11 I I 1, I I - ­�'" 11 I , ' "' , ; 7, e " � "I'7: 7 ( e , _' , " � , I 'f"' I I I � ­ � , I I I 11 , I I 11 I , , , I " '�� , , , . I I I I , , , I I , � , I I I 1, , , � " I 1, I , " � , , �" , ' "' ' " " ,,, " "7 ;" """'�'­":T " � """"' I I I I " I ,,, ' I I I I , , I I I I , I ' I 1, I I I � �'� ' , � . . I I � I I I I � I I I I I , , , I 11 I I " I I I I I , " , I , , " � , "� , I I " I . I I , I �' I I I , I I 11 , �111 , , I 1, I I I " � , ' ' ' , I , , � , , , I " " , "' �'' " , " I � '� 1, I I I I I I I I �" I I I I I " ", � 11� , ,,, '' 1, " 1, I I ; I I I I I I I , " 1", I � , ' ' :' I 1, I I I I 1;' 1, I I I I � I I I I � I I I I I " I I � I I I I I I 1, 1� ' , I I , 1, I I ,� I I I - I I I '' 11 I ''I I ­1 I I 11 I 1, 11 I I I I , I , I I , I . . I I I I , ; I I I I I I I I " I �' I , 1: , ;" : I I I I � I I I � I , I I I I , I I I � I 1, ;1 " 'I, " I I 11 I I , I I I . . I I I I I I 11 I ; , 1, I � I I I I I I I " I I I I I I I I I I I 11 I I I I I I I I I , I I I I I I I . I I I I I I I . . I I I I I . . I I � I . I . I . I ,. � � I � I ' � . � I I I I . � I . . . I � . I . I � � I I . SE I/ 4 9 S 1 � a I >. M j a I W - " U U U W - X = U U 1- I z � , W !-g >. I 1� r: , W - , > " 0 0 :) 0 :; � I In a. < he g 8 .' 96 6 j L_ z Z. AB. 80 \_/ ir A11 O.12 4.89 ' \_/ \_/ \_/ 4th 0+25 quttetA8.26 0+75 t drives grA3.20 1+00/1%4.09 1+2A4. 58 . 0+5 Al. 49 1 1+501%4.23 * '0010 -*" I Ave . S-Pl4hish floor 49.61 . I -.0 � �V"` I - -1 � __Iqm� ­""� \_/ '�_ - - I ___-_ _;'�4*7 U.3 * 0+29 -.98 ­_'_ \_/ IXY-­­ 0+50'_�OA 140. 0 I --- - --- , 00;0 ' E - \_/ __'___­P _P� \_/ - - � - * - * A * * * * - 2+25 '48. \_/ IN +9X10.l.5l 1+00 2 .311+25 , hub 3.33 ?� 48.69 2+50 48.03 2+75 1 6 3+00 48.17 3+25 48.64 3+50 45.39 * . setup X"49.35 I 0 0 b 0 \_/ 00 AP * 3+75 48.19 found 48.17 � I � gw4er/ k. 01 \_/ N \_/ \_/ 0+7AO. 40 \_/ 0 0 Z) X 1 \_/ S 00*02'33"W - * 64_.'_--_--_--_--_-- -..-..--.e 5_9'.'7_8­­_­­ * "' * 2+50 48.68 ne"%9.52 1+OAO. 83 1+2A 1. 64-i ttdr� 51.34 2+00 50.06 rim Cd47.59 rim CB 47.78 2+25 49.18 A- S 00. OWPOPPE I \k( z 1 * * 4+00 48.74 * 1 3+00 45.39 3+75 48.35 1 'blaor;(010. 07 cortnerv, I 'Itl.26 I 3-1-23 2+8. GO * I . - X urb 49. 61 " hc 47.83 I ?� b 0 0 0 �) � 0 (D Z) 0) . z I . 0 0 0 0 . Z) L_ 55.00 0 0 I a2, M '� �) I I - k 0) I I I x ret wall" 42.64 1 r z f . U) . . I r - I �' ?� � b b . 0 0 . . �) �) I � � � I . F=====1 i I . +-) 0 0 Olympic View unrecorded.) I - - ' . I a) I � 0) 0 10 20 . 40 D z z - 1 r C . . T --- 4 r I f g . M I � 1 :39: 1 ft 55.00 1400 55.00 \.-4 1 '.� � I I IN-,- N 00* 00!.nO"�F 11 I tty,_ -Washington. - � I ,, � -11 I - - I I -_ �A­ 41 ­ -"- - I ,- I ­ , ­_- ­­­ ''-.---,, ___' I I - I 11 I ­1 I I , I 11 � � � r1fM CA8.96 0*_615 1+00 2+00 1 3+00 f 4+00 5+00 ....................................... : .............. : ....................................... : ............... I ....... 11 ............. : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ............................ � .......... V., ..... 11 ............ 11 .... ­ .... ­.'.: ....................... I .... I .......... : ............... I .......... � ............ i ................. I .... � ................ : ....................................... : ....................................... : ............... � ....................... : ............................. I ......... : ....................................... : .......... � ...... � ..... � ................. .... _1 .... I ......................... :_ ............... � ............ . � ...... ; ..... * ...... ­ ...... ­ ............... : ......... I ...... * ... ** ........ * .... 1­;­­­­­ ... ** ........... *,*"""i**""""*�*"**"*�1*11 .... "I-I*1*1*t",*,***""'**"*"""",*I .......... V***­­1 ................... ! ............................. I ......... t ....................................... : ..................... I ................. : ...... I .................. : : : : : I : : : : : : : ; . : : ; : : : : ; �­**­.­­ .... * .... " : : : : : : : : : : : ......... : ......... : ....... ­; ......... : ......... : ....... ­: ......... : ......... : .... .... : ......... : ......... :....' _ � - ......... :' .. I I .. . ....... ! I ........ : ......... ........ .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ......... : ......... : ......... : . ! : ......... : .. . .... _ : : f � ..... : ........ � . '' . '' : : : : : : : : : : : : : t ; : : : : : : : : : t : : z ; i : : . ......... : ..... I ... : ......... : ......... : ...... ­.: ......... : ......... : ......... :.. I ...... : ......... : ....... I.: ......... : ......... : ......... : ......... :11-1-1 ... : - I - I ..... : ...... 1. - ...... � : - . ­: . . ..... : � ........ : I ...... I.: .. I : .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : . : : : : : : : : : : : : : : i ; : ! ! : . ...; : : ::.. : I : : : : : : : : ..... : ......... : ......... : ......... : ......... : ......... : ... ­ � ... : ....... I.: ......... : ......... : ......... : ......... : ........ � : ......... : ......... : ...... I ... ! ......... : ... I ......... .... 1:1* ­1111:1­ ...... : ..... : ... I I I - I * i I I - . I—:......... : ... I ..... : ......... : ......... : ......... : ......... : ......... : ......... : ........ I : .... . : : : t : : : . : : .:.. : : : : : : : ; : : : : : : : : i : : : ; : i ...... : ......... : ......... ; ......... : ......... : ......... ..... �..:: ......... : ..... � ... :.1.111 ... : � ........ : ......... ......... : ......... : ... ..... : ......... : ......... : ........ � ! ......... :.. I .... ­: - .. ' - .. .... . ;1 .... I ... :... I ..... : ........ 1 ......... :..: - - : - : : ; .... : ..... I ... : ......... : ......... : ......... :.. I ...... : ......... : ... I : ' : : : : ; ! : : ; : : : : t : . . .... : : : : : : : : : : : : ; . 1. ..... ......... : ......... : ......... ......... : ......... : .... .... : I ....... � ! ......... :. I ..... I ..... ......... ........ :.. I I .... :.. . . .... : ......... : ......... : ......... : .......... : ......... : ......... : ......... : ....... I.: ......... : ......... : ......... : ......... : ......... : ......... : ......... :... 1. I : * ..... , '': .... : : : ... * '' * ' *; '' ­ : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ! : : ! : . .... : ..... I ... : ......... : ......... : ......... : ........ I : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ; ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ........ � : ......... : ..... � , ­1 ­ .... �;11*111 *: I ........ ; ......... : ......... : : '': ­ ­:: : : : : : : : : : : : : I : : : : : : : : : : : : ; : : : : : : : ... 1:. I ....... : ......... : .......... : ......... : ......... : ......... : ......... : ......... t ......... : ......... : ......... : ......... : ......... : ......... : ......... :.. I I ­..: ......... : ......... : ......... : ......... : ......... :.. � ...... t ......... : ......... : ..... ­ ... :.. � ...... : ... ..... :­ ...... : ......... : ... I ... I.: ......... z ......... : .. .... : : : : : ; : : : : : : : : : : : : : : : : ; ! ; ; : : : � : : : .... I .... :.. I ...... : I ........ : ......... : ......... : ......... : ......... : ......... : ......... : .......... : ......... : ......... : ......... :. ­.. � ­: ... I ..... : ......... : ......... : ......... : ......... : * * ....... : ... * ..... : ......... : � ...... ''!_ ..... 1. i ........ �:. I I ...... : ......... : ......... : ......... : ......... : .... t : : : : : : : : : : : ; : : t : : i : : : : : ; ; : : : : : : : : :80:: - .. .. - - .. .. - -:: .......... :: ......... : ......... : ......... : ......... :..... ....... : ......... : ....... : ......... : ......... : ......... :. I ... � ... : ......... : ......... : .... I....:.. I ...... : ......... ......... :111­111:­ ...... : ......... : ......... : ......... : .... � .... :' � ....... : ......... ; .... .... : ..... ... !. ­ � ..... : ......... : ... � ..... :.. .8*0: : - - : : : : : : : : : . : : : ... ... : : : : : : : : : : : : ... ....... :_ ........... i : ... .... :.... ; ;. . ................................... : ....................................... t., ..................................... : ....................................... t ....................................... t­ ...... I .......... I ... I .............. : ...................................... It ................ � ...................... : ................. _­­­­ ......... : ....................................... : ....................................... : ....................................... t ....................................... : ....................................... : . ................................ : ....................................... ! ............. � .......... I ........ � ..... : ....................................... ! ........ ­ ........ ­ ................ ­:.­ ....... � ..... I ...... I .............. �% .................... � ....... I .......... ; ...................... I ..... I .......... : ....................................... : ....................................... ; ....................................... 1 ....... ... .. , : .......................... I ..... : ................................ : .. . ................. I ............ I.: ....................................... V.....' ..... I ... I .................. i... : : ... ..... I., ..... t., ..................................... : ....... 11 ....... I ...................... : .... V.. �. � ..... : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : .... t ........ I : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :.. 1. I .... : ... I ..... : ......... : ......... :. I .... ''I.:. : : : : : : : : : : : : : ; ! : : : : : : : : : : ! : : : : : : : .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .... 1­11: ......... :11 ­11 111:1 ''I ..... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :­1.1 .... : ....... I-_ � ...... : ......... :.. � ...... :.. � ...... : ... I ..... :.. I. ­ ­: ...... ... : : : : : : : : . : : : : : : : : : : : : ; : : : : : : : : : : : I ... .... ......... ......... :.. I ...... : ... I ..... : ......... ; ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ...... I—: ......... ! ......... : ......... : ..... ... : - - � ...... : ......... : ......... : ......... : ......... : ......... : ......... .... :. I I ...... : ......... : ......... : .......... ! ......... : ......... : ......... :. . : : : ; : : : : : : ; : : : : : : : : : : : : ! ; : : : : : : ; ! : : .... :.. I ...... : ......... ! ... I ..... : ......... : ......... : ......... :. I 1. I .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ... ­...: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ....... I.: ....... _: ......... :. I I - 1. - I.: .... I .... :. I ....... :.. I ...... : ....... 1. Z. I ....... : : : : : : ; : ; : : : : ! : t : : : : : : : t : : : : : : : : : .. I.: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :111111111:1­11111: .... 11111: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .. ...... : ......... : � ....... I : ...... 1. �: ...... �..; ......... : ..... I. I.: I .... ... I:— I ...... 1 .... . : : ; : : : : : : : : : : : : : : : : : ; : ......... : ......... : ..... � ... ........ : ::: : : : : : : : : : : : .. � ...... ..... ......... ..... . � ....... : ......... : ......... ; ......... ; ......... : ... . ... : - * ...... : : .. I ..... : ......... : ......... : ......... : ......... ! ......... : ......... : ......... : :11 11", * ­:­' : : ......... : .... : : : : : : : : : :' ­:.: ... .... : ......... ; ......... : ......... ; ......... : ......... : ......... : ......... : * . ; : ; : : ; : : : : : : : .... � : : : : : : : : : : ......... t ......... : ......... :..... � ... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :. � ....... : ... I � .... ; ......... : ......... :.. I ...... :.. I ...... : ......... : ..... : ........ : -:: ... I : ......... : ......... : ......... : .... 1. I..; ...... 1- ......... : ......... : ......... : ......... : ......... : ......... ; ......... : ; : . . : : : ! : : : I : : . : : : : : : ; : : : : : : : : : : : : : ......... : ......... : ......... : . . ....... :. I ....... :. I ....... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ........ � : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : I ' ' I ..... ;.. I ...... : I ........ : ....... _: ..... ... : ......... : : : ; ; ; : : : : ; : : t : : ! : : : : : : : : : : : : : : : ; ; . 7:0.1 : ......... : ......... : ......... : ......... : ......... : ......... : .... I .... : ......... : ......... :1*­1­: ......... : ......... : ......... : ......... : ......... :­­ ... : � ........ : ......... : ......... :..... ....... : ......... : ......... ; ......... : ......... : ....... ­: ......... : ......... : ......... : ......... : ... � ..... : ......... : ..'' .... : .... ; : : ; : ; : : : :701 ......... : '' . . ................................ : ....................................... ; ....................................... : ... � ................................... : ...................................... �: ............................... I ....... : .......... I .................. � ......... : ....................................... : .......................... � ............ : ....................................... : ........ � ....... I : ; ..; : : : : : ; : : : : : : : : : : : : : : : ........ I .... I ........ ;: .................. I ... " ............... t ......... I ...... I ...................... t .... I .......... :1 .......... :...: ... :.. ............. ......: ............... I ....................... : ............... I ....................... : ..................................... : ....................................... : ....................................... : ....................................... : .......... I ............................ : ....................................... : ....................................... : ................. I ..................... : ............... I ............... I ....... t ....................................... ! ....................................... i ....................................... : ....................................... : ....................... ­ ............. : ....................................... : ....................................... : .................................. .... : ... : ; : : : : ; : ; : : : : : : : : : : : : : : : : : : : : : : .... : ......... : ......... : ......... : ..... I ... : ......... : ......... :' ­ * I I I I 1: ' '' * ..... : ......... : ......... : ......... : ......... :. � ....... ; ......... : ......... : ..... ­ ­: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ... I ... I.: ......... : ......... ; ......... : ......... : .... I .... � I ........ : � I.,— : : : ; : : : : : : : : : : : : : : : ; : : : : : I : : : : : I ; : .. I.: ......... : ......... : - I. I ..... : ......... : ......... : ......... : ......... : ... I ..... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .... � ­ ­: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ..... � ... : ...... I—: ......... : ......... : ......... : ......... : ... I ..... : ......... ; I ........ ;. I ....... : : : : : : : : : : : : : : ! :. . . : ....... :: I : ! .... .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ; ......... : ........ : ......... : ......... : ......... : : : : , : : : : : : : : : : : ; ......... : ......... : ......... : ......... : ......... ! .... I .... : ........ �! .... � 1. I.: ......... : ......... : ..... � ... : ­ I.....: . ... I.: .... : ......... : ......... : ......... : ......... ! ......... : ......... : : : ! : : : : : : : : : : : : : : : 1: : : : : : : : : : : : : : ......... ......... : ......... ; ......... : ......... : ......... : ......... : ........ I ........... t ......... : ......... : ......... t ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ....... .... :.. I ...... : ......... : ......... : ......... : ......... : ....... I.: , '' ­ .... : ......... : : I : : : : i : : : : : : : : : : : : : : : : : : : : : : : : : : : : ........ ­.. I I ..... : ..... I I—: ......... : ......... : ......... i ......... : ......... : ... I ..... .... 1 ......... : ...... I—: ..... I ... : ......... : ......... : .... I .... : I ........ : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :.....".. 1: ......... : ......... : ......... ; ......... : ...... I—: ......... : ......... ; : I : : : : : : : : : : . : : : : ... : : ........ : ... : I t : : : : : : : : : : : : .. I ... : ...... I—: � ..... ­:. .... 1: I ........ : ... ::'''' ......... : ... I ..... : ......... ......... :.. I ...... : ......... ......... ; .... I .... : I ........ : ...... I .. ......... ......... : ......... ! ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .......... :.. I ...... : ... ! : - - .... : ........ I : ... I ..... : ......... : : : : : : i ..: : : : t : : : : . : : : ! : : : : : : ! : : : : : : : : : ; : : : : .... : ......... :: ........ : ......... : ......... : ......... : - , , , ..... ;''*,* .... :*­ ..... : ......... : ......... : ......... :. � ....... : ......... ; ......... : ......... : .... I... 1: ......... : ......... :''­'111:*­ ..... : ......... : ......... : ......... : ......... : ....... I- I ....... : ......... ! ......... : ......... : ......... : ......... : . I ... I I I:— . . : : : : ; : : : : : : : ; : : : - : : : : : : t : : : ! : ; : . t ... I I... . . ......... : ......... : ......... : ......... ......... ......... ......... : ..... I ... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :. I ....... : ......... : ......... ! ......... : ....... I.: ......... : ......... : ........ I : ......... : ......... : ....... I.: . : ... :6.0.. . ...... : ... I I ... : ......... :.'' ...... ; : : : . : : : : : : : : : : : : : : : : : : : : : ; : : : : ; : : : : : : '��A ... ...... : ... � ..... : ...... ­: ...... ...; ......... : ......... : ..... I ... : ..... I ... : I ... I .... :... . I. . . :­ ...... : ......... :1 ........ : ......... : ......... : ... I ..... :. I ....... : ......... ......... : ......... : ......... : . ........ : . : ...'....: ......... : ......... : .... I .... : ......... : ......... : ......... : ......... ! ... : : . ! I : :­ ...... : * ' ' ' .... : * ..... * '':' ; : : : : : : : : : : : : : :.... .... : : : : : : : : .... . .. . ......................... I ...... : .. . ........... I ....... � ............ : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ............... � ....................... ! ..................... I ................. : ....................................... t ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : .................... ! .................. : ........... : ... � ........... � ... : ...... : : ! : ..... ............................ " ......... t .. . ................................ t .. .................. I ................. ; ....................................... t ........................................ : .'.. . : .... I .................. � ......... I ..... : ....................................... : ....................................... ! ....................................... : ....................................... ! ................................ � ...... :_ .................................... : ....................................... : . . ................................ : . : : : . t : . : ; : . : : : : : : : : : : : : : : : .... : : : : : : : ...... : ... I .... � : ......... : ......... : ......... : ......... : ......... : ....... I . ......... : I ........ : ......... : ......... : ......... : ..... I ... ! ......... : ......... : ......... : ......... : ......... : - - - - .: ......... : .... � .... : ......... : ......... : ......... : ......... : . . : : : : : ; . I—:....... ­: ......... ; ......... : ......... :.. I I ..... : : ......... !':..::.. , : : ; : : ; : : ! : : : : : : : : : ; : : : : : : : : 1. I.: ......... : ......... :.. I ...... : ..... I ... : ......... : ......... : ......... :11*111,11; ......... : ......... : ......... : ......... : ......... : ......... : ......... : ....... � �:. � ....... : ......... : ......... : ......... : ......... : ......... : , ........ : * ........ : ......... : ......... : ......... : ­ � ..... ; ... ­ I—: ......... : ......... : ......... ! . . : : : : ! : : : : : : : : : : : : : : : : : : : : : : ! : : : ; : ........ : : : � : : : ; : .... : ......... : ......... : ......... : ......... : 7 ........ : ..... I ... :. I ....... : ......... : ......... : ......... : ......... : ......... : ......... : . ......... :.....'. 1. .: ......... ......... : ......... : ......... : ......... : ......... : ......... ......... :. � ....... : ......... ; ......... : ......... : ......... � .... I .... : ......... : ......... : ....... : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ......... : ......... : ... � ..... : ......... : ......... : ......... : ...... ­ ''I'll''*:- ...... ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ....... - : : : : : : : : I ... : .... I .............. :. � ..... ­: ......... ......... : ......... :. I ....... ......... : ......... : ......... ......... : ......... : ......... : ......... : : : : : : : : : ; : : : : : : : : : : : : : : : : : : ; : .... : ......... : ......... : : ........ : : ........ : ......... : ....... I ': ....... * *: ... I ..... : ......... : ......... : ......... : ..... I ... : ....... I.:. I ....... : ......... : .... I... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :.. I ...... : ......... : � ........ : ......... : ......... : ......... : ......... : ......... : : : : : : : : : : : : : : : : : : : : : : : : : : : : ; : : : ......... ......... : .... I ..... : ..... ......... ....... : ......... : ......... : ......... ; ......... : .... � ... 1: ......... : ......... ......... : ......... : ......... : ......... : ......... : ........ _.. � ...... : ......... ...... I- ......... : ......... : ......... : ......... :. I ....... : ... ... ... .... : ......... : ......... : - I ...... : ........ : : :­ ...... :' * '' : : '' : : : : : t ; : : : : : : : : . . : : : t : : : : : : t i : : : : . ......... : ......... : ......... : ......... : ......... : ......... : ......... : ... I ..... : ......... : ......... : ......... . ... ..... : ......... ; ......... : ............... ... ........ e:x .................. : .... I ... �:.. I ...... : ......... : ......... : ......... : ......... : ......... : : : : .... �.. I .... I.: ......... : ........ : ... ... ... :. I ....... : ......... : . 111111- .... � ... ­111 . : : : : : : : : : : : : : ; : : ; t : : : : : : : : . : . .. an ... ... ."... :1 ........ : ......... : ......... : ..... '­.: ......... : ......... : ......... : ......... : ......... ! ... ..... : ......... :.. I ...... : ......... : ......... : ......... : ......... : .... .... . ......... : ......... : ......... : ......... : ..... .� �. ... �. : . ..... :.. : . : ......... : - . A. I ....... : ­ I .... � : ......... : ......... : ......... : .. - : : : : : : : : . . : . : . . : : ; : : ; : : : : : : . .. . . , . : t: .................................. I...., ........ I., ... ­ ... ! ............. I ......................... : ... I ................................... : ................ I ...................... : : : I : : ......... :. ............ : ....... ......... t ..... : ........ �: ........ �: I ........ : ... I I .... ! ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :. I ....... : ......... : ......... : ....... I.; I ....... : : ........ I : ......... : ......... : ......... .... : ... I : : : : : : : : : : : : : ......... : ..... ...... ':' s .!� *. : : : : . ............ : ................................. ;.=i ... ? .............. :: .................... ��'.: .......... ' ... ... ... : ..':'� : : : ....... � .......... I ...... �* . ... ... ... : . ........ Q ........ : I . ... . ......... I.: ........................................ : ............. I .......... 1. ............. : ............................... 1. ...... : ....................................... : ................... I ................... : ............. I ......................... : ....................................... ; .......... ... : .............................. I ........ : ....................................... : ....................................... : ....................... I ............... : ........................ I .............. : ....... I— ....... I ............... . :. .. . .... . : I : . : : : : : ; - ;iaw: ....................................... : .......................... . . ... I . : ....................................... : ....................................... : .................................. ­­:... ..... I ... I ......... I ................ : ....................................... : ....................................... ; ....................................... : ............... i : : : : : : ! - . : : : : : : : : : : : : I - '-..'! ....... : ......... : ......... : ......... : ......... ;.. ­... ...... : ................... : ......... : ......... :.. I ...... � .... I ....... ..... : ......... : ......... : ......... : ........ I : ......... : ......... .... : ......... : ......... : ......... t ......... : ......... : ........... : ........ ..... ... : : � - : . ! I . : : . : , , , " ­ � ..... � : : . : ... . : : : : . -.-,.? . . ..;e".��' ­P: : : : : : : . . , . ". . �-� : �'. -1!1� ...... : ......... : ......... : ......... : ....... I . t ......... : ......... : ........ ................ : ......... : ......... : ...... . : ......... ; ......... : ......... : . ..... : ......... ......... : I .... ­ .... : ......... : ......... : ................. . : .+ - � - - - - : ! . I . : : .. . - o I . : : ; . . : � d ; - : : : : : : : : : : : : : : ! : : . : : . : : : � : ......... ... : .... . ...... : ... : ......... : ......... : ......... : ......... : ......... : .... I ... : I .... I ... ; ......... : ......... : ......... : ......... : ......... : .... I .... : ......... : ......... ......... ......... : ......... : ......... : ......... : ......... ........ . - I . . : ......... : ....... : ...... ... I ...... . : . : : : : : : : : : : : : : .... : ... ­ ... . ; ... . . : : : : : : : ::: ::.. I.- . : : : : : : : : : : : : : ....... � : . . I ... I . . ! . I . . . : : ......... ......... : ......... : ......... : ......... : ........ : ......... : ......... ! ....... I . ; ......... : ......... : ......... : ......... ; ......... : ......... : ......... : ......... : ......... : .......... ; . . . . . ....: ......... : ......... :..' ...... ......... ; ......... : ......... : ......... : ......... : ......... : ......... : : . : : : : : : : : : : : : : : : . : : : ; : : : : : : : : .: ......... : ..... ....: ......... : ...... ...:. ........ . � ....... ..... ......... : ......... : ......... ........ .: .... : : : : : : ; . . ." ...... : ......... : ......... ......... ......... ..... I ... : ......... : ......... : ......... : .... ­1 : ..... I ... : ......... : ........ : : ...... ... : .... : : : ......... : ... .... : ......... : ......... : ......... :...... ... : ......... : ......... : : : : . : : : .... ''. : : : : : : : : : : : : : : : : : : � : : : : : : : : : : : : : I .... : ......... : ......... � .......... ......... ......... : ......... : ......... : ......... : ......... : ......... : ......... : ........ I ! ......... : ......... : ......... : ......... : I ........ : ......... : ......... : .......... : ......... : I ........ : ......... : .1.1 ..... : ......... : , : ...... � I .... : ......... : ....... I.: ......... : .... : : . . : :' .... '.'.­i'::'::::'� : : : : : : : : : : : : : ; : : : : : : : : : : : : : : : : : : : .... ; ........ I : ......... ; ....... ­ : ......... : ......... ; ......... t ..... I ... : ......... : ......... : ......... : ......... : ......... : ......... : ....... I. : ......... : .... I..'': ......... : ­ ....... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ! ..... ­­ : ......... : . ....... : ......... : ..... : I ' : : ; : : : : : : : : . : : : : : : : : : : : : : : : : : : : : : ........ : ........ : :: ...' . :. ......... : ........ 1:1 ........ : ......... : ......... : ......... : ......... : ......... : ........ 1: ..... I ... : ......... : ......... : ......... : ......... : ....... I.: ......... : ......... : ......... : ........ I:— ....... :­11 .... :­ ...... :. . , . ....... : ......... : ......... : ..... I ... : ....... ­: ...... ­.; : : : : : : : : . : ::40: � :: : : : : : : : : : : : : : : ; : : : : : ..... I � ......... : I., ... 1:. ; ......... : I ........ ; ......... : ......... : ......... : ......... ! ... � ..... : ......... %. I ....... : ......... : ......... : ......... : ......... ; ......... : ......... : ........ : ..... � ... : ..... I ... : ... I ..... : ......... : ......... ! ......... : ......... : ......... : ......... : ......... : ..... ... ;. I ....... : ......... : . . ; t. :40: ......... : '' : : ; : : : : : : : : . : : : : : : : : : : . � I : : : : : : : : : ..' ..................... I ......... "....­ .................. : ......................... I ............. t ....................................... : ....................................... ; ....................................... � ....................................... : ....................................... : .......... 11 ........................... t ... � ............................... '..':­'­:­*­1­*­­ .... 1­­'­t­­­­ .... ­­­,­*­­­­%** ... ' .... ­­­* ..... *'**­­­­:1 ...... ­­­­­' .... ­­1-'­:­ .... ­­ .... ,-*","",*,-,"""--.**"",*,***"**"***"* ........ * ... ,-*:"*,***"*,*,**,*""",***"**"",***: ... ­*­­* .... ­'­­'­ .... "':1­1 ... ***** ..... ­­1­1111111*111t, ... "I, ... **'­­*­­'­­ ... "V­ ...... *­'­ ... *­'­ ... *""**:,*""*",""",*,,1*11 ............... : ....... � ...................... " ... ­­.­­ .... ­ .... *' ..... * ... * ...... I'll: .... ,"**"****"*'*"**""-*,-**,"":,*,***",*"*'*",--*I ... 11-1 .......... : ................. I ..................... : ....................................... t� ..................................... % ....................................... : ............................ � .......... : ....................................... : ....................................... : ....... : ............................ : : : : : : : : : : : : : : : : : : : ; : : : : : : : : : : : : i .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : . ....... : ......... : ......... : ......... : ......... : ......... : ......... : I ... ... I : ... I ..... : ......... : ......... ; ......... : ......... : .......... : ......... : ......... : .... � .... : ......... : ........ �: � ........ : � ........ : ......... : ......... : ....... : . ..... I . � ; : : : : : : : : : : ; : : : : : : : : : i : : : ..... ......... : ......... ! ......... t ......... ::: ...... I . : : : : : : ..... : . . . ....... : ......... : ......... : ......... : ......... : ......... :..... I 1. : ....... I.: ......... : ......... : ..... I ... : ......... : ......... : ......... : ......... : .......... t * * ' ' I I * I 1: ' I . - : : : : * I ...: ........ �:.. I ...... : .......... : ......... : ......... : .... : I ..... I . : ......... : . ....... : . : : : : : : : : : : : . : : : : : : : : : : : : : : : : : : : : : ........ . .: .*,:: ':: . ­.; ... ... I—: ... .... .: ......... :.. I ...... : ......... : ......... : ......... :. I ....... : ......... : ......... : ......... : ......... : ......... : ......... : ........ � ! ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .......... : ......... : ......... : ......... : ......... : . ; ...... It, : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ......... : : .... :.:: ...... � .............. * * * ... ­: ........ ': * ........ :­­ ... : '' * ...... : * ­ * ..... : ..... I ... : ......... : ......... : ......... ; ......... : ......... : ......... : ........ : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : � ........ : ......... : ......... : ......... : ......... : ......... : . : ......... : ....... : : : : : : : : : : : : : : : : : I : : : : : : : : : : : : : : : : ......... ......... : ......... : ......... : ......... : ......... ......... ......... : ......... : ........ � : ....... ...... ......... : ......... ......... : ......... : ......... ......... : ......... : ........ I : ......... : ......... : ... ­.. : ......... : ......... ; ......... : ......... : ......... : ......... : : : : : .... : . :..... I ­ 1: ......... : ......... : ......... : : : . : I : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ......... : ......... : ......... : I ....... I : ......... : ......... i .......... � ... I ..... : ......... : ......... : ......... : ......... : .......... : ......... : ........ � : ......... : ......... : ......... : ......... I ......... ! .. ..... .... : ......... :. I ...... � : ......... : ......... ; ......... : ......... : .: : I : - - �'_: ..... : ......... : ......... ; ......... : ......... : ......... : : �:: , : : : : : : : : : : : : : : : : : : : : : : : : : : : : : I ... : ......... : ...... I—: ......... ! ......... : ......... : ......... : ... I ..... : ......... : ......... : ......... : ......... : ......... : ......... :. I ... I ... : ......... : .... ... I : ......... : ......... : ......... : ......... : ......... : ......... : .... I .... : ......... : ......... :. I ...... �.: ......... : ......... : ... ­ ...: ..... ­.:.. I ...... : ......... : .. ... : : : t : ; : : : : : : : : ! . : : : : : : ; : : : : I : : : : : : : : : ...... I.: ... I ..... :.''. .... I : ......... : ......... : ......... : ......... : ......... : ......... : .... I .... : ......... : ......... : ......... : ........ : .... 1. ­ : � ........ : ........ � : ......... : ......... : ......... : ......... : ......... : ....... I.: ......... : ..... I ... : ......... : ......... : ......... :.. I ...... : ......... : ......... : ... :30.. : : : : : : : : : : : : : : : : : i : : : : : : : : : : : : : : ! . . : ......... : ......... : . � ......... : : ........... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ..... I-- - - � ......... : .... .... : ......... ; ......... ! ......... : ......... : ......... :.. I ...... ; ......... : ......... : ......... : ......... : ......... : ......... : ......... ! .......... : - - - 30: ......... : - ' . . : : : : : : : : : : : ; : : : : : t : :: : : : : : : : : : ............. d ..... I .................. t ....................................... : ....................................... : ....................................... :: .... I ................ I .......................................................... ; ..... I.: ....................... : ...... ... ... .... ................................... t ....................................... : ....................................... : ........................... . .......... : ....................................... ! ....................................... : ....................................... : ....................................... 1 ....................................... : ............ � ................. � ....... 1 ....................................... : ................... 4 ................... : ....................................... t ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... :. ........ I ......... :..' ..... 1.4 ...................... t...­ ............................. 1 ....... : ...... 1* ............... � ........... :; ... I ..................... I ............. : ... ........ I ...... I ................ : .......................... I ............ t ... : � : : : : : : : : : : : : : : : : ; : : : : : : : : : : : : : . ..... : ......... : ......... : ......... : ......... : ......... : ......... : .... ­ ­ ! ......... : ......... : ......... : ......... : ......... : ......... : ..... I .... : ......... : ..... I ... : ......... : ......... ; ......... : ......... t I ....... I : ......... ; ......... : . ..... . : . ......... :. � ...... : ....... I . .... : : .... : ......... : ......... : . ....... : ......... : ........ : : : : : : : : : : : : ; : : .. i : : ; : : : : : : : : : : : : : : ..... . ........ : ......... : ......... :.. � ..... . . ......... : ......... : ......... : ......... ......... : ......... : .......... : ......... :........': ......... : ......... : 4 ........ : ......... : ......... : ......... : ......... : ......... : ..... � ... : .... I .... : ......... : ....... ..... _ I ...... : : : : : : : : : : . : . . .... : ......... : ......... : : ..... ... : * I I 1, - 4 1:1 I 11 : : : ; : : : : ::.-�EII'�'��%" * .... : * t : : : ! : : : : : : : : : .......... : ........ I : ......... : ......... : .... I .... : ......... : ......... ; ......... : ......... : ...... I—: ......... : ......... : ......... : ..... .n'.0:4. ......... : ......... : ..... � ... : %4 ..... : ......... : . . . : : . . ......... : ......... : ......... : : , I ... :.. I ...... : ......... : '' ..... : ........ : ...... I.: ......... : ......... : ......... : : : : : : : : : : : : ......... : ......... : ......... : ......... : ......... : ... I ..... : ......... : ......... : ...... .'! %'. : : .. ......... : ......... ......... : ......... : ......... : ......... : ..... ­ : ......... : ......... : ......... : : : : : : : : .: I ........ : I .. I . . .... : : : . : ! : : .. % R�l - I :-:8'893: :: ... ; : .. ......... ......... : : : �� 0 � JOb' . . : : : : ; : ......... : ......... : ......... : ......... ; ..... � ... : � ....... � : ......... . I! �k ..� .... : ......... : ......... : ....... :. I ....... : ........ : ......... : ....... : : : : : : : : . . : : : : : : ; : ....' ..: ....... I.:- ... ­ I i ......... : ... .... : : : : : . : : : : : . . . . . . . . . : . . . . . . . . . . . . . . . . . . : . . . . . . . . . : . . . . . . I . . : . . . . . . . . . : . . � . . . . . I : . . . . . . . . . : . . . . . . . . I ; . . . . . . . . . : . . . . . . . . . : . ...4.4' , - "s : .... : ......... : ......... ......... : ......... : ........ ......... : ......... : ......... ......... : : : : : : . 0, : : : : : : : : : : : : : : : : : : : : : : : : ; : : do I ' .. : : : .. ...... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ; ..... ... : 'Z' ... .0� . # . : ......... ..... ... : : : : : : : : : : ; : : : : : : ; 4 '�" *' ; : *11,1111, : I 11 * : : ; : I ......... I .......... : ......... : ......... : ......... .... .... ' : ' ' 10;:�§ I ..'�� 0 . ; ........ : ! : ..:: :: : . ......... : ......... : ......... : ......... : .... : ­'­**: ......... : ......... : ......... : ........ � : ......... : . � .� ... : ......... : � ........ : ......... : ......... : ........ : ......... : 0 : : : : . . . . . . . . . . : . . I ,. . � . . , : . . . . . . . . . : . . . . . . . . . . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . : I .'e.!` I W / . � . : . . . . . . I . . . . . . . . . . . . : . . . : : : � , : . . . . . . . . . . : : : : '�0 � .... : ......... : ......... : .... I .... :1 ........ : ........ : ......... : ......... : : : : : : 4 .44 " P : A : ........ : : ..... :.,. I : : : : : : : : : : : : : : . . . � . . ?,.v - : : : : : : : : : : : . . . . . . . . . . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : .* . i � . . O'l..."'A". : ! . .: ......... : ......... : ......... : ......... : ......... : ......... : ....... _ : ......... : ........ 1: .... 1. ... : ......... : ......... : ...... ...: .... . ': . � : : : : : : . I . : : . . . . . . : . . . . . . . . . : . . - . - - .0. . . 0 : . . . . . . . . : I . . � : . . . . . . : . I . . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : : : : : : ; : : : . . . . . : . . . . . , . ". : A.� iiftr�;j : 1:0 6 108- ; : : : : : : : : : ......... .... I ... �: ......... : ......... : ......... : ......... : ......... : ......... : .... * - - . ........ ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : : - , - : . � :­ ... I I.: ......... ! ..... I ... : ........ : ......... : - ; . : 0 - : . : : : : : : : : : : : : : : : : : : : : '20 ......... :­ ....... : ....... I ......... I ' ' ........... : ....................................... : ....................................... : ....................................... : .E-IVED- - 1 ... .. �d . ..."* ... i ............... � ............ I—.. ..... : ........................ I ........ I ..... : ....................................... : ...................................... k8t :20:: . ................. � .................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ............................... : ....... : ....................................... : ................... I ................... : ................... I ................... :1 ...................................... : ........................ .. ........... ........... A.:,..:..-!!.: ... :1 ... A .......... Z­ ... ......... ...................... I .......... I ... . ...... 1.4 ....................................... :.... ..... : ..................... : ....................................... : ....................................... : ....................................... : ... � ................................... : ....................................... : ............................ . : : ... S.. �%... , ..j%..'1'0: ...... : I :7 "Illl*""**""*"***"**"",:", "I,*,*""",*,*,*,,",**","*:* .... *­**'­­­­­ .... **'­1­1:­*­­­­** . : : : : : : : : : : : : : : : : : : ; : : : : : : i : : : : ..................................................................... : ......... : ......... :.. ... ... 1: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : . , : ......... ; ......... : ......... : ......... .... : : : : ! : : : ; : : : . UP . :. I ....... : ..... � ... : ........ : ........ : ... ..... : .......... : I 0 . Vr . ....... : : : : : . : ..... : ......... : ... 1. ­ 1: ......... : ......... ! ......... : ......... : ......... : ......... : ......... : ...... 0� 1-8, ­: .... � .... :.. I ...... ; ... 0 ....... ..*I: ......... : : : .... : ......... : . . I ...... : ........ ........ : ......... : ......... : ... : V­' I : : I . . : '. : ' : : : : .... . . .... .... : . ..... : ......... :..... I—: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ...... . ...: ......... : ..... � . * "' 'Sheet: 2::o,f: .31 1 * I I I I * : : ...... : : : : : : : : : ,T;j. , . . : . . . vo * .9, - si'l '�/ * 40. : . . . . . . . . . � . . : : : : : : : : . Iq : : : : , '8 : .P ... zoo , t : : : . . . . . . : . . . . : . . . . . , , li�� k. I . . . . : . . . . . . . . . ! . . . . . . . . . : . . . . . . . I . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . : 0. : : : : : : : . . . . . . . . ; : : : : : : . : : . . : . . ......... : ......... : - -PR..QF ILE , * *0'F * * '4't"' h* ... AVE' - - . : . S .0. . : . ......... : ......... : ......... ; ......... : I ........ : .... I .... : . . . . 0.1%. STE �..k.jo:. :: .......... : ......... : ...... I . . : ..... I ... . : : : : : : : . . . . : .... . .... . . .... . : ......... : .... � . � . . : ......... : ......... : ......... : . : ........ : : ......... : ......... . . : 6 : : : : I .... : ......... : ......... : ......... ; . . : : : : : : ; : : : : : : : : : .1 : : .... # ;!�� *,q .!* '�. ; ...... : : : : : : ......... : ......... : ......... : I ........ : ......... : ......... ; ......... : ......... : . . I ...... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : . J'l . ....t . . : : : : ... : ......... ! ......... : ......... : ......... 6 :'',:.. ':­­ ... :­­ .... :*''* .... *: ... '­ .... : ......... : ......... : ......... : . ....... : .... 1. : : : : : : : : : : : : : : : : : : : ......... : ......... : ......... : ......... : ........': ......... : ......... : ......... : ......... ; ......... : ......... : ......... : ... ..: ......... : ......... : It . : ....... :.. ... : , : : : : : : : : : : : ..... ..: ..... I ... : ......... : I— :....... I. ; ......... : ......... : ......... : � ........ : ......... : - : ....... : ......... : ......... : ......... : : ......... : : ... ENC-11VEERNG - : . . i, I : : : : : : : : : : : : : : : : : : : : : : : : : : . : : . . ........ : ......... : . ....... ..... : ......... I ......... : ......... : ......... :11,11,111:111, ..... ; ......... : ......... : ......... : ......... : ......... : ......... : ........ 1: ......... : ......... : .... ... ! ......... : ......... :.. .. ..: ......... : ......... : . ....... : .. ... ... ! : : : : : : : : : : : : : : : : : : . .... :..' ...... ! ....... I.: ......... : ......... : : ....... **:'''' : : : : : : : . ff � : . ­.' ... : ...: ......... : ......... : ......... : ......... :... ...... : ......... : ........ �: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ........ 1: ......... : ......... : ......... : ... ... ..: ......... : ......... :: : : : ......... : ... I ..... : ......... : ......... : ......... : ......... : ...... .. :­ ..... 1: ......... : ......... : ..... : : : ...... : ......... : ....... I. 11 ...... : ... : ' ''' ; : . : I . : ......... : ......... : ......... : ......... : ........ : ......... :­ ... ­: ......... : ...... : : : : : : : t ; : : : : : : : : : : .... : ... : � : I : : : ..... : ......... : ......... :.1 ....... : ......... : ......... : ......... : ....... ­:11.1.1 ... : . I : . : ....... I.: ......... : ......... : . ...... : ......... : ......... : ......... : ......... : .... : : : : : : I . i : : :.... : : : : : . : : ............... : . .. . . ..... .... I ....... :.. 1:0: . : ... :.... :.... .... .... .... ....................................... : ....................................... : ....................................... : .............................................................. � ................. : ...................................... �: ....................................... t .................. I ..... % ....................................... : ... ... .. ... . 1.0' * . : : : . .................. : ........ I— ... I ........ !� ...... I ..... : .... ................................ V. . ................................ : .. . ................................ : .. . ................................ : .. . ........... I .................... : .. . ................................ : .. . ................................ : : .... : ... : ... I .......... :...."1111111.­11 ... I ... "--*",**t".*",:"""*,"*""*-1111*1*1"""Z""*'ll"""'*'*'***11*11"*-"",*":",*"",*111111*""*""**'* ... *1­­:­­'­'­'­ ... **"",",,-""",:,I'll"*,*'*"*,*'*'I ..... 1­1­1­1"; ..... ­­*­­* .... ­­'­*­­t'­­ .... ' .... ** .... *",*-"*,*,"*":*",*,***"*,*"**,* . - : . : : ; . ....... : :7 : : : : : : : : . .... I ............. % ..... I ................................. ; ... I ................................... : .. . ....... I ........................ t .. . ........................ : ................. I ....... .... ...... I ... : .... I .................... : : : : : : : : : : : : : : : : : : : : : .. ..... : ........ : . ....... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ... ­­t ......... : ......... : ..... I ... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :.' ....... ! ......... :: ......... : ......... ! ......... : ...... .. I ... ; ......... i ......... : ......... : . ...... : ......... : .... : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ...: .... : : : . . . . . . . . � I : : : : : : : : : - ! . ....... : ......... . : : : : : : : ; . . . .. . . .... :.. . . . .... I I .. ..... : .......... . : . :. ­.: ... ......: .... . : I . . . . . . ......; . . ... . . ... .. :. : . : : I : : : : : : : : ..... I. . . . .. . .... ... ....... : ......... : ... .: ......... : ......... : ......... : ......... : .... ''..':..'' ..... : ....... .... . . : . . . . . . . . I .... : . . ... . . ... ..; . . . ! : I - - 1-1- I : : . .... : ' . : . . . . . . . . O'R'tS' CERT I F:I*CATE' ' '' :­'' .... : ' . . . S . . . . I -AiN: -A*R*Y'' : SEWER: ::: : :: : I ......... : .... .. 'VEMENTS ...... STO R M .'' * D R AIN ... &'':'S .... F; ": IT' I . . ... .... . . . . .. � .... ... . . .. . . ..... : ......... : ....... ......... : * '' * ' * ­ ..... : TREET':''1'MP'R:0 .... :..:C,O: ... : . . . LU ........ . : i : : L ; ! : : : : : : : : : : : : . . . . . . . . ... � : A ........... ........ : ......... . ...... : ......... : ......... : ......... : ........ . . ....: ... I ..... : ........ I : ......... : ....... : ....... I.: ..... : I ........ : ....... : . : ' . . . : . -EI -� ''! ... .... : . ....... : ......... : ......... : ......... ! . ... : ... : ....... . : ; : : : : : : : : : : : : : : : : I : : : : : : : . - (� 0 rLS ( 0'(� - I �/' * ' ' ' * '' ' r�ts' ' ' .... *' .... * ': **''*' ' ......... : ...... .... : ......... : ......... : ......... : ......... : ......... ! ......... : ......... : ......... : ......... : ......... : : . : Tt')'i'5 'r��Lo' * . . nepres.(� . ,a 'Surv.ey. . .... : ...... ­ ..... : ......... : ......... : ......... : ......... : ......... : ......... . t� : : : : : : : : : : : : : : I : : : : : : : : : : : : :i ... '. .' ' I .' *1 ......... : ......... : .... 0 .... ......... : ......... : ......... ; -b : : ......... : ......... : ......... ......... : . : : .; ......... : ......... : ......... : ........ 1: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... :. : , ........... * I : ::* ..... : ......... : ......... : : : ... ­­ : ' - ­ ­­ :'''' ..... : -made -by:,: -me - or. -under - -my - di rect-i-on: i n ...... * : ­­ ­ 1 ­ ..... * : ........ ' : ' ..... *** : ' ­­** : .... *''** : '' ... : : : : : : : : : : : : : . : ! : : : : : : : : : : : .. : : - . . ... : ......... : ......... : ......... : ......... ! ......... : ......... : ......... : ... I ..... : ......... : ....... 1. : .......... : ......... :. I ..... : .... I .... ; ......... ; .... .... . : : : : : : ; ......... : *h 1 . ..... lb . ..... r�.et;tUin . A n t. :..* ... b.'f" ..... . ........ : ................. : ...... ..: ............ : : : : : : : : .0**:­­ .... :' ........ : . ....... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ' .. - . ' ................. : ................ ... :..!;;�qn,f�.Qj��m...,.n*z.!��..*..�W'!....h. . .Q. . ..O.fn ia .. 5. ... * . ............ I .... I ......... I ....... V., ......... I ... I ...................... : ......................... I .... I ....... : I ..... : ........... 1. ........... I ............... : : . : : : . . : . I .......... : ....... ... X ............... I ............. i .... "IL ...... I ... I ............ : : I. ' ­ .... ** ....... ­­ *** * . .. ................. : ............................... ................... � .............. : ............... � .................................................. I ............................................ : ....................................... :1 .............. I ....................... : ..... I ................ ' ' * * ' 11­1­ '' .... * ­ - - - - ........................ I ................ . . . ......... ..................... �----.-- -� ....... ;t , _- -.I.- - - � - - ... - ..'. - - , -'�� ........... � I I I : !-'�'� ... !,,I,. : : : : : : the y-Re . ...... ....... I ! ......... .:. .... : ......... ; . .:.. - : . .... : ..... ...­­: ......... : ..... ... ... . ...: i : ; . c-or,d i ng -Act.. : : : : : : . : : ; : : ' - - - ' " - - : : . : ' ... . .... : ......... : ... ..... : ..... . . . .. : ......... : ....... ... ... . . ... . . I . . . ... ...... : ...... . . . . : I.. .. . : . . . �4_ .... : ...... I - : ......... ' ' .... : ... . . ..... : ... . . : . . -0 - : 0 ........ : .. . . : .. : : z : : ; � : . . : : . . ...... : ...... . . .... . : � : .... : ......... : ......... : : : : : : : : . .. : : . �0�� . ......... : ......... : ...... . . . : 320:':'W:A'L'N:UT .... : : 1. .: : : 4 : b .. . . _D ... .n. : TME4 "'UILDING : .1 .... . - - `­"­­'­'­*U­N­1* ... T­­­'*`A­P­A*'R­ ... *'***'*'*"*"'*"*"*"*"*'*** T :: ... : ... :6 ...... E3 ... (1). ........... "")... ... � "O"N' : _,Surk/e .. - . ., ­T-1. * '­­'P ... E ..... 1� ..... : ........... 7"7"*6-.***'*'********3"9:*'3**5 : ­ ........ * ... '­ ..... 2 ' FOR—' ... ' .... "O.- : 28 - S'­ ......... W: H .: ....... ..... � :. .. .. .... :1 ........ : ... 4 ..... ......... : ......... : ......... : .... : ......... : ..... I ... : ......... : ......... : ......... :. I ....... : ......... : ......... : ........ ..:. I ... :.... . . . I .. . . . : : I , . : : : : : : : : : �.�AA ­ - -I I - �' &-, �_ -Y ........ : : : ; : : . : ......... : . . _____ - ; : : : : : : : : : : ... : . . .... .... : .... 4 .... : ......... : ......... : ......... : ......... : ........ : ......... : ........ .. .. ... . . . .......... : ......... ..... ......... : ......... : ......... : ......... : ......... : ......... : ...... .... : ......... t ......... :1 ........ ; ..... I ... : ... I .... 1: ......... : ..... . : � - z - . ,*ff.J&-- I - !*''*,*''*:, ... : ;­1­''::1­1 ' : : . _:_ rl lt*� ' _%r : : : : : : : : : : ! : ; : : : : : : : : : : : : .:.c _. ...= ........ : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ..... � ... : .......... : ... I .... :1 .... I ... : ....... I.: ... I ..... : .... : ......... : I ........ : ......... : ........ � : ......... ; ....... I . : ......... : ......... : ......... : ......... : ......... : ..... 1. . : 6'rb*t i f i i::'ate * no*.* 1* !9-7S - - - I __ : . : : : ::::::::: ' ' : : : : : : : : : . : : : : : : : : : : : : . . ......... : .... I .... : ......... ......... : ...... : ......... :1 ........ : : : : ........ . . . ..: ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ..... ... : : , : : i .... : ......... : ......... : ..... I ... : ......... : ......... t ......... : .. ....... : ......... : ......... : ......... : ......... : ......... : ......... : ......... 4�7 ' ' ' . : . . . : : . . . : : : : : : : : V-. I . ' : : : : : : : : . : : : : ::: ...... i ...... � .. . ....... ; ......... I . : : ... : ......... : : : : : : .... P. I ........ . . I I . : : : ..... : ... :..' ..... : . : : : : : : : ... :.. ..'..: .... . :*­: ..': ........ ..... *.­.: ... 11 .............................. ­1 .... : ......... : ......... : .... ....... : ......... : ......... : ... 1. ....: .... I .... : ..... ...... ' : M.O.-k- IDS ...... ............ ; ... W.-A : . : . ..... : . .... : : : : : : : : I . .. . .: . :.. . . . : . .0 ... : ..... !.. : : : . : . . : : : : .10. : ..... ...... 0 ........ A) ............. . . . . IN: : 0).. . . ; ... I . : . -N ' : 1 ....... . ....... . ...... I . .................. I . ...... : - n. ... . E - - - ....&..-: ... ...... M.-II.C.H.E.L...* ... * ... *2...- :0: 1:01-;-�76 I : : : :: , '' * ..... :: , , , , ­ - , .... * ­ *:, ­ * , , , ­ I ....... : *,:: * ...... '..' ''. I , , * ..... . ..N �H):::W­­ ...... ' ... ­­­­ ..... ­­­­ ... ­ ­ * * ...... : .... ­ * ... ' ... ' ... *:, * ' ' ' ... * t . ..:. . . : . . . . .... : .... � .... ; ......... : ........ I : ........ : ......... : .... t V ..'E.D. .:, * � *:M' :98' '' � ... : ...... .... , .-.I:O*UNTLAKE:':TERR'A*C:E:::::::W*A'*''*:..'.- .043 . ... .... .. ....... .. ... ... ... A.-VE...-- . ...... :...- ' ; : . '91*''*. * : : : ... ... : ... ' ... : ...............................................i .............................. :::, . ... t ..... ,I.* I ...... . ....... : ..................................... ... ....................................... : .............. � ....... " ............... : ......... I ............ I ............................................ 4. .......... ; ............................................................................... : ....................................... : ............................................................................................................................................................... : ....................................... : ............................................................................... : .................. I ............. I ..... : ....................................... : ................ . . .. . : . . +) Q) Q) I I I I I I � I , I I I I I I I � I � I I � I , I I I � 11 I I I I I I I I I I I I 11 I I . I - I I I , � I I , � I I I I I I , I � . I 11 I I I I I f �' I I I , L I I , I � 11 . 1 97534 � Uj --%:: HERCULENP 11.11C '�EE.11.11111G 111M I I I I . I I , I . PAN fC- CRYSTALENE'll TRACING PAPER I . - I 11 I . � . I � ? PATTERN NO I � � I I I � � . � . I I . I I ' I L . I I ; I . I ; ) � I 1% I - I I I I I . I - . .. I- . . � I . I . � . I I I I I � � . � I I I . I I . I . I I I . I � I I I I I I I I I I � . I I I I . I . I I I I I I . I I I . I I �'. I 1� I � I I I I I I � I � I . . I I ! I I I ! I I I . I ! I i 3 1 I I . � I I I . I I I I � I I � 11�- I i --,--,-, � � I � - ��� . . ; . 0+ 50 I . � 30.00 � I I I I I . . 0 - - 30.00 . . ! , I - - - ! , - - I . � 1 ! . I + 1 . 00 I 7 ! I . . ! . 1 -�- I I - - - I- . <--2% 1 2:-1 side slopes 148.SO, 1 <--2% 1 - 5.i 1', / 0 0 �l'�49 ! I I ! I . I . � ! I . I I ! I I I � � 49 � i� - 5z q =-t 20.00 -!q�� : n-b -0 I . ;====:I I i 1p:--- I I �-W I I a N 00*0010011E i -- 1 =. S.00 �- , ,, 4,- 11 ! O.So r I I I 20.50 I 0 1 - ----- - 01 ! I I b I I N I 88OS1'1511E I O.So I I- ! ! I -- L-- I - . I ; c 1 S 0000010011E i 0.33 � ! I I I 1, ---,-� 11 I I I ---------_�- I I d I I S 00000'00"E 1 O.G7 - i i . I . , ! ---�- ! e ` 11 N 000 00'00"E 11 1.00 I � . I I I I - -1, I - ;>% --,---- I 49.SO <--20% , �/� 1 f 1 N 000 00'00"E 11 O.So 1 i . , . ! . . - --- � cl 20.00 b 5.0 5.00 I 1 9 �� 11 S 00*00'00"E 1, O.So I W I R / I i . I . i R/W . I . . -r- 4-9 I ::7 M MI- ""AX - I / I /' C4- 1 V V I . . - 20.So I ---41'U _ , ��� ,_,_� - I 5.00 -1- 4 9 I I I W 1< 1 I , I , I I I . � I . , - ! . I � I 0 I ! ! ! 1-- I i I I I 1 30.00 1 - ,a - 30.00 � I I . i ! � R�/W I i I . I I . 11 \ I I I ,� ! I . 'I 1 R/W I , >- M . . i i i . I � I W& I 30.00 . : ap -4 I I 30.00 . 0-1 . . 1 30.00 . . 1 - I 30-.00 I i. - - I I ! i � � 10t25 ! � . ! i . �,. � . . . - � I I � : i I I i i , � � 30.00 � � I ,30.00 . 1 I 1 C 0 W W V x bd �d ! . .i I I ! 1 I . 1 R/W I I I I i i I 0+75 I . "I ! . I . x x I I . I I I I i U U � 01 z i W . ���� r.al 1 . ' <--2% i t . � ! 11 I I W In �- � * . r- 0 I I -�-�48 �����< �--2%1 �16 I . 1 48. 00 2%-> I 20.00 b 5.00 1 1 - ; - I I �2 I i � 5 ao-�. I .� - - CL < Ix , . C.J!- . ---I U 48 I � . I I . J I ! 1 I -- I R/W I I 20.So . I I . � -- se 9 - 8 to � ! 1 � I . I . I I - I I . I I I i I I Ui 96 I.- 0 6 I I � . i . i . - . 1 <--2% -7---ill- ! I . " z z . I i � . , . I -­1 -49 - -IN I - ----- 3 P? , i 49.00 20.00 -----� 13 5.00 .. :�/ - U ---aL;j . -r- 49 I I � ! I . I 1 I ! , I 1 V - T1 I I - - 20.50 . , 5.00 . I I 1 I I I 1 i � I I I I I i I I . 1 � I I . I ! 1 30.00 ! 1 30.00 1 i i I I -� I - , X, ,- - - --� I I I P- - I � � i '? " I . 11 I R/W I I , - to 'r, D6 7, f COLA ar .1 ­ I � I � � � I I I : I i . I i 1 J( 4 'SASt,: 60cAr'-ca 'EE-' ! R/W 11 � I � 0 Sect 1 ons '- : I -0 30.00 . ! 1 30.00 I I . I I I I . I . %- 144 . I - - � -0. . I I I + (n . I + � , - I il . , . I k..s I - t:,- t:7, I 11-�- ! � I - I ". I i I � I I , , -�-- 11 .� �-,� ---" --- - 11 -1-1 I " /, --/ - - -,-, -�-� f -1 -1.1 - - I- - - I I -- 1, - - -- 2+,00, --- ,� 4+00 .11 I . � I I 1-,-.�-­­-,� ....................................... : ................................... ............................. � ......... : ............ � .......................... : ....................................... : ....................................... : ..................................... , ............ � . --.- ............................... � .... I.- ...................... � .................. I .............................. I ... t ...... � ..................... I ....... I-: ..................... ... I ....... �, ..................................... 1;1 .... I-- ... � ...... � ..... 111.1 ...... ;- .................... � ................ �- ......... - ..... � ..... ; ....... I ..... 1-1 ........... I .... - I ) 10+00 ........ : ....................................... : -,-1+00-.- ...... ..1',-.4-3tQ=P1 .......................... t ................... � .................. ,-.--------- ..... * ... 1- ... :",*,*,*"*,***,*""""""**,"**,*,: ... , .................................. I .... t ....................................... : ............................... .............................. I ........ : ................. :.1 ......... � ......... : ....................................... 1 . �. . -," ....................................... : . : : : : : : : : I - : : : 1-111-:1-11111-1111-111 ............... 1.11-:11-1- ... � .... 1-1-1-1-1-11-11:11 I ... I ....... I ... ! . : : : . .... I ..... : : ! . . ................. � ............. : : : ..: .......... : ......... : ......... : .... ;.. -:. I ....... : ..... I ... : ......... : ......... : ......... : ......... : ......... : ......... : ....... ..: ......... : ......... : ... I ..... : ......... : ........ I : ......... ! ......... : ...... I � : ; : 7 ... ---, I I i . ; : - * ..... . I . .. ... I ... I ... - : ; I .... : ........ : ......... : ....... I I .... I.:- I � ..... : : : 1. : : : - I : (0 : :..... ... : : : : : : : : : : ; � , - -;,- : ..... � ... t ......... �. � ....... 1 ......... : . ; : : : ....... ........ . : ......... : ......... : ......... ......... : ...... -: ......... : ......... : ......... : ... . : I ..... -.: ......... ! ......... : ...... - 1: ......... : ......... : ......... : ...... I... : : : .... : .... ::.. M: ......... : � ........ : ......... :.. : , : : : : : � . : ..... I I �: : ::,:: .... I ! ..... ........ . . . .... ..... - ; , � : . : . : : : : : : : : : : I : ......... : ....... , ..... I . 1. : : : .: ....... :. � ....... i , ..... ::: : i ......... : ......... : ......... : - - ........ : I ... I ... I : ......... ......... : ........ 1. � ........ : : : : ..: ..... I I ......... 11.1 ..... : � : .... ­­t ....... * *: . ....... : ... * , '' ­ t, : : : . : ... I ..... : ......... ; ......... ....... : - I .. . . :". I ... * '': .... .... I . . ; : : .... .. : ......... : ... : . - . . . - - * .... .. * . ''. 1. - 1. ; � � .... : : : : : : : : : : : ; : ......... ; . ..... -:. I ... 1. 1. : ; : : ; ;1 .... : ......... ; ......... ' ... . ' : -1 : ! I I : co! : : ! : : 1. : : : : : : : : - .1...: : : ! : : : : . : : .... I .... ;. I ....... :. � ....... : ......... : ........ I : ..... I ... : .... I .... : I .... : ........ ::. ........ :.. . ....... : ......... : ......... :- . A. A. -1 - .. ... : . . . .... .!.. �: ........ : : ; ! : ; : : : : ......... : A � . .... : .: ....... : ......... :.. : . I ....... : ......... :- . . ,.: ... : : .... ... �-.'.. -. - : ; i ; - . .. : I I I.... . -- -:* ... * , *:: .... : ......... : .... : : - . . . ... ... . . , . F. .... : ... : .... 11-1: ....... : .......... : ......... : ......... : ..... : . : ....... : , : : : : .0 . , ... ... , . . . . r. -%, - ... F ... .. A .... ai Q- * - : :-111 --;I',,- .... ...: ......... t. ......... : .... . -V * - " ... R 0 ... : V E::': " S ... � '''TO ..... W ... LNUT'''': ....... ` .... . .. : ......... :­' ..... :---1----: ' ' ::.. ..... . . . ......... : ......... : .... : ......... : PR FIL E ... 0 F ''' S TO R m­:'S'E-'N ' " * M­4th'' � .. I.: .......... 1 ......... ..... ... �- : : : .... I .... : : . .... .. : , . . . (1) ..:.. I ...... : ......... : ......... : ..... ... :111 ...... : ......... : ...... I I.: ......... :.. : : ..... . : : : : : ..... : ......... : ........ . .... .. 1111-11-:-.1 . . , I : : : . . : ......... : ......... : ......... : ......... : .... . : . : . I I .... ; ........ 1:.. . ... . . : : : : : .... : ........ 11: ......... : ......... ; ....... . : : : : : : : : . : � : ...... I.: ......... ..... . . ...... I : ......... ! .... : : ; : : , : ..... t ; : : : . : ! : . I ... : ......... : ......... ..: ......... ......... : ......... : I ........ : � .... - 1: ......... : ......... : ......... : ......... ; ......... : ....... , ......... : ......... : ........ : : : . : .... - 1. : : : . .!. I ... I I..; I .......... I ... - �:: : I ...... ......... ! ......... : ......... : ......... : ......... : : ......... : ......... : ......... : ... : � : t : *1 : : : ; : : : I : � ........ : ..... � -.: .... I : ......... : F=! : : : : : : : : ......... ......... : ... --.: ......... : ......... ......... ....... : ......... : ......... : ......... : ......... : ...... �. I.: � ..... 1. �: ... I ... : : : ...... : ......... : ......... : ......... : ......... : ......... : ......... : : : :111:1 ....... . : : ...... . : : : : � ; : : : : : .... : ........ :... . : ..: ...... I I.: ......... : ... I L.: ................................ : ....... : : : . GO: , : ......... : . , I ...... : : . COL�UMBIA- LAND:SURVEYING :&, ENGINEERING -.� ..... : I .......................................... 1 ....................................... : ..... ................................ : .... -.- ..... . . ...... I ..... : ...... I ................................ :: ......... I ............................. t ........ � ..... I ...... � ...... : . : : � .............. : : ....... ! : . .. : : : : ....... .... ..... : .:: ............. I ......................... :: ............... I ....................... : ................................... � ... i., .......... - ..... i ....................................... : ....................................... : .......... a ................. ............... E) ................... : ....................................... : ....................................... � ..................... � ........ "Ill"*,:",*****'*'*'***'*'**"* .... -*- .... : ........ I ...... I ...... I ......... ... ..., ................................ :: .................. .... .......... 11 .... 1: ....................................... : ....................... I ............... : ... ... ..... ...I., .................... � ................. : ................ �P.P-J ... * ...... . .......... I ........ P=$1 .. . .......... I ................ : ......... I ............................ : 0 : : : : : : : : : : . . ................ 11 ..... 1 ............................. � ......... V., .................................... I ................... : : : : : : : : .... .... : ... .... : ......... : ......... : ......... : ......... : ..... - . � ......... : ...... I . . : ......... : . . : : ; . I . . : ........ 1r: : ......... : �, : . Im--- ....... : ......... : ......... : ......... : ......... . : : ........ : ......... : ......... : .... I .... ; ....... * - : * , *, ,�A' - * * , : ..... * , , , : r a : : : : . I . . I ) ... : ... I ... I . :: ........ : I : : : : : ; : : : : : ......... :.. ! - : : : ; : : : I : : : . : ......... : ......... : : ... � . . I . I I ......... : ......... : ...... I . . : : : Tom, Relsd! r%ff ; -P.-L.- ; . . : ....... :-: ... :-7,", . . : ......... : ......... : . . I ...... � : ......... ... I .... : ..... .. . . . : . . I . ....... , : ......... : ......... : ......... : ......... : ......... ; . I .... i ... : . I ....... : : - : ....... .... : I ........ : ........ : ......... : ....... : , ; ... : : : : : , * , * I I * I - : '- 9 ........ S�-,,: P,.E,., , .. . : .... . . � : : : : ..... . : : : : : . : : : " ; : : : : : : � : : : .. I . I : ..... I ... : , . I ..... : ......... : ......... : ......... : ......... :: ... I . . . . . ; ......... : ......... : ......... : ......... : ......... : : : . :1 ........ : ... - . :. . : : i : 19..: .......... : ...... I . . : ......... : . : ......... : ........ 0: ..... I ... : ......... : ......... ....... � . ......... : ......... : ......... : . I . I . . i. . . : ......... : : : * , * , , .... ; , : : : :-- : : : : : : : : . : : : : : : : � : : ! : .... : ........ 0 : ... Go. : ............ : ............ : '. ' '. 'cb'. ' - '. : * ' . : : : : : . I : : : . : ......... : .... . . 0. . . : : . I . . I .... : I , * ....... �t: ......... ! : . I ..... : : : : . : ......... : ..... I ... : ......... : ......... : ......... � ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ; ......... : ..... i380 :226th . : : I : : I I , I I I ... : : : : : : : : , : : : : : : : : : . : : . . : 1 ........ (D:: : : ... : ....... ......... : ... (Y) ..... :: ......... : ......... : .... (Y) .... ..... t ..... : ......... : ......... : ......... : ......... ; .1 ... I ... : ......... : ......... : ......... : ......... : ......... : ......... : . : ... I , . . I . . $ W ......... : ......... : ......... : ..... :::: ............. ; . ... . : ......... : ......... : , ; : ...... I . :: ......... : : : : : : : : : : : ; : : : : ; : : ! : . . � ...... : ......... : ......... : ....... I : : .. : : . .: : : : ! : ......... : ......... ! ......... : ......... : ......... : ......... : ......... : ......... : ......... : ...... ... : ......... : ......... : . . : : . ......... : ......... : ......... : . ....... : : : ......... : ..... : : r� ; . ......... ; : : : : 11-1-1 I : I I I I . . , . . .... 1 ......... : * ' * ' * ... * : ' ' : : '::­ : : : ....... �: I .... :Moun-t-lake. Terv-ace,- V : ..... : , .... : . ...... .. : : : : : : : : : : t .:11 ....... :.., ..... 1:.. : ., ! : ..... I ... : .... I .... : ......... : ......... : ......... : ......... : ....... - : . ....... ; : : : : ..: ... .: ......... ; ......... : .... . ....... : ........ : ........ : ....... : : . : ......... : ...... �, . . :: ......... : .... I .... : ....... I . : : : : . . .... : .... : ... il. - - . . : ......... : ......... : ......... : ......... : : : ....... a�. 98043 : . ; ....... l] : : : : : : . : . . ; ...... 1. . ; ......... : ......... : .... I .... : ..... I . . �-: - - , - , :: .... ,­ * I * ­­ ­ * I ......... I— , : 11 : : : : : : : ; :,.:* ......... : ..... a . . : ..... 0 ... : ......... : ......... ; ......... ......... : ...... � . I I : .... I .... : ......... ; ....... I . : ......... : ......... :: : � ... ! ......... : : ......... : .. : : ...... 1. � : : ; . - . 0 : : : : : : : : : : : : : : : . ....... : ..... � ... . ; ; : ......... : ......... : ......... : ......... : ......... : ......... : .... I .... : ..... ... : : : : : . . . : ...... - . : ................... . : ......... : ......... ! . . . ....... : ......... ! ......... 776-3935 , - : I .. ... ( . C-1) . ....... I : ......... - n: t I ........ : ........ ;.- ..... :..... .... : ........ 1: ... . : : : : : ' ' I .� ..... : ........ � : I ... I .... : ... 11 ... : : : : �� : : 10 : : ................... - : : : : : : : : : : : : : : . : . .. ...... I ......... ...... 1. : .... .... . . . . . : ... ..... '--:---------, .......... : : : ! : . : , ............ ....................................... ..... ": ....................................... : ....................................... : ...... :1111-1111111- ... *-**-'- .... -,:- .... -* ... , .... ---11----1:--**,* ..... ---- ... - ...... **:,**"*'*'**,*"**'**"""**,"* ... -:--11-1111-1-111 ... "*,*"**"":**"**"*""*",""***""*,**",*,*-:"*:"""""*",***11,l**"*I ... * .... :*,--,-,--*,,*,"*"-,l---*--"***"*,*,:**""*I .... --*1111111-1 ......... 11:1-1-1 .................. � ..................................................... t ....................... I ............... : .................... I ... ..... i : ! : ........ : : .... 55: : . : : ......... . ...: ......... : ... I ..... : ......... : : : . . . ............ : ....... 1:- ..... : :, * ... !f> ............. : ................ .... ...i. - - . ... ... ... . 1. .. ....0 !$` , , "'..., ... " .. ... ... !.!.t ....... : ................. "...* .... I ..... �: .... � .............................. ........... 1 : ... - ... **----*,- ... , .... : ­­­-, ... ­­ 4 . . .... : : : : : : >,, : : : : : : : : : : : : : : . : .... : . ........ I ....... ..... ..... I .......... : ....... : ...................................... . It .... .. : ... ... : ......... : ......... : ......... : ......... : ..... � ...: ......... : ......... : ........ : ......... : ......... :.. : : ** ...... :,4.4.iw,w.*-ji,ii*.iv*-*���**.iiwi*'iii.i�l.iv.ii*.i;.*iwii,iwiw"**"**********.**.i**"*"'****'**'*'*"****"'****'* ... 4 ** ......... : .: : : ....... I.: ...... . ... . . - V. . . . ... ..... : ................ .... ; 7r: ...... *-* . . : ......... : ......... : 5 :5. ....... : ......... : ......... : ........ *--- ..... **** .... ***"*' #.#W***W*#*. . ** � ... :... I .... : ......... : ......... . . : ........ : . : : : : ......... ..... . : ......... : ......... : ......... : ......... : - : ......... ; .... I .... : .... : ......... : . : : : : .... � ... : ......... : ... I ..... :.. I : , , : : - ........ : ......... : ......... : ..... - I:- : : ; .t !. : : : : : : : : : : . . I . : ........ , : : ! ,.I. : : : : : : : : : . : . . . . . : . � ..... 'STEM S- . : I : �>: : C--4 ... . . : .... C- - - : .... C. (Y) . . .... � I . . : .... � : : ! ......... : .......... - I - . STORM -WATER -D'ETENT-ION. SY -CALCULATION : . . I I ..... : . I ....... : ......... ........ ......... : ......... : ........ 1: 1 : . ......... :.- ..... : ...... -.: ..... .... : : : . : ... I ..... ! ......... : ......... : ......... : ..... ! ... : ......... : ......... : ......... ; - - ........ : : : ... :..'' ..... : ......... :- ... : ......... : ......... :* : ....... :- . ......... : ...... -.: ... 1-..: ........ : C: : . > bi .... . . ..-I . . . . . ", ,It . . : : : : I : ; ! I i .. . . . . : ........ : ......... : ....... , .1H."t : : : : : : : : : i ... : ......... : : I : : : : : I . : ! : , � " :: : , : ......... : ................... : ......... : ......... : : :- I .: ......... : ......... : .... I .... : : : ......... 1-4: ... I ..... ........ C ....M ........ : : : ......... : ......... : ......... ......... ........ : ......... ! ..... : ......... : ......... ......... : ........ � : .... � . ! . . : I : : : : I :� ..... ...: ......... : ........ .... : . : : : : : : ; : : : ..... I ... : : : : : : I ... : ......... ::for,-PROP08ED -3-UN-IT-APARTMENT -61JILD-ING- 1 ; : : : ....... I : : ........ ...... ......... : ......... : ......... : I : .... I .... : ......... : ......... : ......... : ... I ..... : ......... : ......... : ......... : I - . ........ : . . - .... : , - - ! ! .... : ......... : ..... � ... : - : ....... ,q: ..... : ......... : ... N. - . : - : ... . . . : � : : : : : : : : : : : : : : : : . .... : ......... : ......... : ........ : : , : .... : : I I : : :: , * * 'M 11* , * :: * * , �t 11 ... :; ......... : ......... � ......... : ... - I : . . �, .. ....... : ......... : ... � ...... : ......... : ......... : .... I .... : ......... : ......... : ... �- I - : at; '32'0' Walhut'St.- - -- : ..... : : � : :11 ........ : - ...... : ......... . � . . .. . ..... .... : ......... : .... 4 .... ... ... : - ...... : ......... : : : : .... : ........ (n: : ........ : . ....... : : : , ,­...: ......... : .... - I.: ......... :.. I : : : : : : : : ! : : : : : : : : : : f : : ; : - . I . . . . : . . . . . . . . . : . . , . . . . . . : . . . . . . . . . : I . . I : � : : : : . . i . . . # #. : . . . . . . . . . : . . . . . . . . . . . � . . , . . . : . . . . . . . . I ; I . . . . . . . I I .... : ..... : : . Q� ...... ... : . . ..... , : I ........ ......... : ....... ..... ..... I ... : ......... : .... .... � ... .... : ......... : ......... : .... : ......... : ......... : ......... t ......... : ......... : ......... : ..... � . . : ......... : ..... I ... .. : z : : : 1-4. : : : : .. : : ; : : : : : : : : : : : . i. : : ; ........ � . ....... : : i : ......... : ......... : ..... . : ........ I . : ......... : ......... : ......... : I ........ : ...- ... : ......... : ......... : ......... : ......... : ......... : ......... : ......... ..... ... : .... I .... : .1 : : . : : : : : .. -E ... : � on.Ptn.. :SE -1/4, SE: 1/4. .23---:27'.-b ... * .... : ­ ....... : ......... t ..... � ... I ....... ; * ....... 4: 1�� . .. E ... : ... E. - I .5 - . ....... : ......... : ....... : : : : ; : : I ........ 1 .......... : ......... : ......... : : I : : . : . : , : : : M � . . ; ... M- . : : : : : : : : : I : : : : : : ! : i. ....... ; ........ I ... I ........ : ........ : ....... : . .M .... ......... : ......... : I * I * : . : ......... : ......... : ......... : ......... : I''.. � . . I - * ........ : ......... : ......... : I ........ : ......... : . ........ : ......... : ..... I ... : ......... : ......... : ......... : ......... : ... ; . � : : : : . . . ...... : ......... : ': ....... P..: .: ... I : : ... ­ , : : : ; ......................... .... : .... : : *- ... * : ......... : - : ; . . . .: ... ....... ..... � ..... ; ....................................... : ......... � .............. . : -.411 ................................ :: ....................................... : : : .......................... ,"**"**"**:,",",""",*"* ....... """11111-il-11- .......... * , .... -----:-1 ......... , ..... -**- ...... : : : . I - ........ : .. . .................................... . .................. ;- ........... : . ................................ : .. . ................................ : .... 0-1-TY .... OF ..... EOKONDS .................. : : : : - : : t : ... I ........ I .......................... : ....................................... ; ........ � ..... I ........... I ............ : ........ ... � ........... I ...................... ...A: .., ........... I .... ...... ML : .. .......... -1- ............. I, .............. U..L ........ I ..... � ............................. I ......... t ....................................... � ................ - --t ............. : .............. k.)..f ................ ; ....... I ... 11:- ... ---- :::, ........ : .. . ................................ : .. . ................................ : ....................................... : ....................................... : ....... .... .- ... ... .... *­ i ....... - .................... I ......... t ......... M. U - : : . : : : : : : : : : : : : : : r .. . : I ........ : ... I . !. . I : ......... : ...... I . . : I . . I ..... ; ......... : ......... ......... : ......... :: : -.1-5.0. t ......... : : '40 -LF - o.-P - - : : : : � ... I .... : . . : ......... ; ......... :: : : : : : : : : : .... ...... ..... ! ......... : ......... : : : : : : -P - : : ! : ......... : ...... : . : : ! : . ....... ......... : ......... : ....... I . . . : .... : . . 8.11: :P ..... : ......... : . . � I - . . . : ......... : ......... : ......... : ......... : ......... ......... : ......... :: : : : i : . ' L - ' 0' ....... . I .- . : . 1. � . . :f ......... : . I .. ........ : ......... : ......... : ......... : ......... : ......... .... i. . . : : ! : X: , : .... I . . I . : ........ I ..... U:_ : 50. : : : : : : : : : : ......... ; ........ 1: :.- ...... : , t . . . . . . . . . . : . . . . . . . . . : I 59 . ; . . . . . . . . : . . . . . . . . . : . I . . . . . . : I . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : I I : - - ' : . . .. .. * , * * , I * : : . . . . . . : . . . � . . I . . . PVC ... . . . . : ....... : ........ I : ...... I . . : : : : : : : : : : : : : : . , . . . , . ! . . � ... .... I ... : ... I ..... ; . ....... : ......... : ......... : ......... $ . , t rha t f (5 ri : : .... : ... I .... I ........ ....... : ........ 1: ........ : : . . I ; : : : . : : : . VC : : : E: .1 h-Pbr. : �): : . . : ......... ... : : - . . I � . I tie, ...... : ........ I : ......... : ... I ..... : ......... : ......... : .... I .... : ........ : ...... -: - .... : ; : : . . .... I ... : . I ...... I : ......... : ......... : ......... : ......... ........ : ......... ; ......... : ........ . : : : : : : ........ : : : : : ......... ...... @- :6 - % ..... : - . . * ..... : ... ! : . . ... . ! ......... : ......... : ......... : ......... : ...... : . -" � I� 0!1. :S: ............. : ......... : ... I .... 1 : : � ... I : I .... I ... : ......... : ....... : I ........ : ...... : : : t : I .* : : : : : .. : ......... : ......... : ......... : : : : : . ... ......... : ......... *,.S,..% .... f ......... ! . I ...... : i ; ;�i� .... ... � ... : ......... : ......... : ......... : ......... : ......... : ; : - .. ...... : ......... : ......... : ......... : ......... : ......... : .. ... : : : . : : ......... : ......... : ......... : ..... Aroe Act- 1. .... . : ... 11.1 - : : : : : ! : : : : : : . es - - * -o.0,61 - : I : : : : : : ......... : ......... ! ......... : ........ ..... : .......... .... . I.: .......... : ......... : ......... : ......... : ......... : ......... : ......... :: -11 . : .... � ....... -: : : : . : i�::::::..:.1 ....... : ......... : ......... : : .1 .... 1. . : . . * .. : .... .... . : ......... : ......... : ......... : ..... 4 d --,�, �:-.� : : . . I ...... : ......... : - - - .... ........ � : . :j : , e:�� - & . �3� ; : � . I .. : ..... I ... ; .. I ...... : : : : : � Slo %. dr-a I n I ng - tdwarvd- the-w6st -sId . : Pr6 : ......... : ......... : ........ I . : : : : : : : : . ....... : ......... : . : ......... : ......... : ......... : ......... : ......... : ......... : ......... ; ......... : .... : ......... : ......... : ......... : ......... : ......... : ... V .... : . . . . . . . : : : : : : ; : e : .; ......... : ......... : ....... I.: ......... : ......... : . I . : : : : : ... I .... : : . : : : : : : . ...... .. : .......... : ......... : ......... ! ......... ......... � 'i * , gnou ,=ov6r%: - bar%e -diint ...... . I .. : I : : : : : : : Ex� : ! : I : : ; : : : ........ : ......... : ......... : ......... : ......... ..... : . .1 ...... : ......... : . I . . --- I - ; ......... : ......... : ......... : ......... : ......... : ......... : ......... : : 11 : . : . : : .. . ......... : ... I ..... :. . . . . ...: ... I ..... : ......... : ......... ......... : ......... : ....... : ........ : : . : : ......... : ......... : . : : : . : : : : . : ; : : : : : : ....... !,..- ... : ... I ..... : ... : : : : ......... : ......... : ......... ......... ...... : . .1 ...... ; ........ . . . . . . I : ......... : ......... ; ......... : ......... . I ....... : , : I : : � : *1 ...... : : :1 ... .... : ...... ...... : ......... : ... : ......... : ... ....... . . : . . .. ... .... 1. . .......... :- : . : ...... :.. - ... I : : - . : : : : ! : � : ......... :: ... : .., .: .. . : ......... : . : : : : : � T& - t. v * , ):-+.: ... X.P.:..��.,:..i.qqle...(:P,t,Q,.Q'X ........ t - . : : : : : . . : : � ...................................... : ....................................... : ....................................... : ....................................................... I ......... I ...... ...................... .. �. ................ ! ....................................... � .................. ............. .... ............ I ........... �, ....... : ... - ................................. t ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ....................................... : ........ -.1- ........ -f .... =, .... . I ... " i : : .,....�g.,K.... : ..... ;.�.�: t ..................... I ...... I ... I . ....... I ..................... I ... ... ... ..................... � ... � ............. ................................ � ...... : ...................... . . ...: .................................... : ... I ................................... : : : : -.�qQ1,..:� ...... I ..... =..A.Q,.A ......... 6i.h.' * * ' ' : ....... � ! : : : : : : : : : : : � . .1 .................. I . ...................... I ... -...: .............. I ................... . : ... . I � .0 ............... 1-:1 t � : : : ..: ..... : _: .... �, . . : : ......... : ......... ................... : ......... ....... .... : ......... : ......... i ... G% ..... .... ... ... I . . � : ......... ! ......... : ......... ; ......... : I ......... : ......... : .... : : : ; . I . . . i . . . ... : : . : : : : I : ..... : ......... : ..... �" . . .1.65 .1 .... * r%i Sno. .Co. .1--0yr ......... ' ' .I... : ......... : ... � .. ... ... :----45.:.. ; ! I . ..: : : : : : : : ......... ! .... .... : .... I .... : : : : : : : : : � : : ......... : ......... ! ....... ...... .. ....... : ... I . I 1: ......... : ......... : ......... : ......... : ......... : ......... : ......... :1 ......... , : : ;.. I ... . .... : ......... : . I : . 'L F, - '6-P. - : .... . 70:; LF - 0 f', V"! -PVC- -@ -1: % ... �- - I . . ;60 - LF -0-P: -1 iB-"- . ADS- :@ - I - ,% ... : : : : : I - - I * J Qa I t. owab 1.e , �a,=.0.65 -k -1,65. x - 0*,:G=, , 0* . I 71.6 ::c.-Ps ....... :: .... : ..... t I ..... I . . ; ....... : : ! : : ......... : ...... I I . : ......... : .... I .... : ......... : ......... : ......... : ......... : ........... . . . . : ......... : ..... :,- . : ......... : ......... :: : : : : : �. . ; .1 ....... : ....... . : .......... : ......... : . . I ...... : ......... : . . I . . I . . .... I ............ lk.'.'40. 1. .. ..... : ......... : : ! : : : . : : : .1 . : : : : ; : : : . : ......... : ......... : ......... : ......... ; ......... : ............... ... : ...... : : : i ; : . : : : : : ......... : ......... : ......... : ......... : ......... : ................... :.... . .. . . . . : : ; : : : : : ; . : .... : ......... : .... ..... t ......... : ......... : .... I .... : ......... : ......... : .......... : ........ : : . . : : � .... : ........ ,:. I ..... : .... I .... :. I ....... : . . : ......... : . � : ; : : : : ! : : : : : � vo I . : : : : : : : : ..... ! lum' -of-deten . : : .. .. : ......... : ......... : ..... - . ; ......... : ......... : ......... : ......... : ........ I : .. ReqOfrved I , , -P , I �2?" , , , I : ..... : ..... i ... � ......... : ......... : ... I ... .: ......... : ... � .... 1 ........ I ... �0. . : ......... : ...... : ......... : ......... : ......... : ....... . : ......... : . I ....... : ......... : .... ti'an, T - thfs-devel*opm�ent,: ...... :: ......... :: ......... : ........ � & : : : : ! : 01 : : : . : : : ! . : I : : : ...... : ... I . I ... : ...... I . . t ...... . I - : : : : : . .... : ......... : - ...... ; ......... : ..... ... : .. ... . ... : ......... : ......... ..... ... : ......... ; ........ I . : ......... : .... I .... : ......... ... i : . . � : : .. I - . : .... I .... : ......... : ......... : ... . : ; ...... : ......... : .. ....... : ... . .... ; ... I ..... ; .... concriete ...... : * ... ­'­:­*' .... : .... * ... *:**' . . . . .5% . . I ... : ......... :.. I : . : : : : : ! . !.. : i : . : : ... : : . . .. ... : ......... : ......... : . . . . . , - ......... : ......... : ......... : ......... I : - .... : ....... ... : : : ! 10 '. . . : ........ . : . . . . . . . . I . I . . . . .. . - . . . .. . P .. . . . . . . . . . : . . . , , : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : . fo�L:ril� 'r-I;.,�no,.-Pp, : 0,-Ppf(�(,�ri�-:, , , , : 1 "4 . . . . : . . . . . . . . . : - - . . � . . ; . . � . . . . . . : - : . . : . I . . . . . 4 . . P . . . . . . ; : ; : - : ....... I ........ :1 .... I ... I ..... :...1111. . . . . . ; . . . . . . . . . : . . . . . . . . : . . I . . � . . : . . . . . . . . . : . . . . . . . . . : . . . . . . I . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . : : : : ; ......... : ......... 1 : : : : : -- *tment. -dwe.111 g-enea:- :; ... C. =' 6 *. �!� * .. . . : I ........ : 1. ... I ... . .... e X,., : : ........ : : : : : . : : @ '1 . 25 '7- * : : ,_qr�q�jpo * ; . I . ! .... - - : . : .... ... :7 .......... ...... ;�! 1 � . : : : .... .. ... 1. I ! - ...... : ......... -", . , : : ......... ; .1 ....... ! � ..... Apan ! : - ; . : : . 0 �, ............ ......... : ......... : ......... : ......... : - ; . - . �� .. : . . , .- ... :. i I ..�i i � �� : : : : : : : ; ; : ... 2 * * - .. . ...... : .... ... : ......... : ......... : ..... ._.: : ......... .... I .... .... 1- . : ........ I : ....... . : :11 .... .Qo,4'-Qa1-1-owab-1b/ A=-0.-1- ' .6 V. -( O.. 8 5.:: x - 0 , ' ' . . : . . . -L--�-� : ....................................... : ....................................... : ............................................................... : ........... 4 ........ -, ....... I ................... : . . ................................ :... - ..... I ........................ : .. . .......................... 1.,.% .. . ................................ : ..................... I ................. : :: : : .I......-.1 ........... : ........ . I I . . ................................... .... � .... ...................... 1 . : ! : : : '­ : ........ � .......................... t..1.1 ........ I ......................... i ....... . .......... I ..... I.; ....... I ..... -1...... .......... I ............ --... . : : : . .... 1: ...... I ............................... : .............. : .................. I .... � ........... I-: I : . : . . : : : : ; : : t ......................... I ............. : .................................. I .... t .... I ............................... -.: ........................... � ........... : ........... .................... .... : ....................................... : ..... I ...................... I ..... : : ... :..' . . . : ! : : : ....... : .... I .... : ....... I . : ......... : ......... : ..... ............. : ......... : ......... : ......... ......... : ......... : ......... : ......... : ...... : , * O.' : : ­ : : : : : :: : . : : I I - : * I I - : � 16)= -V-26- cfs/A ; : ......: ....... : ....... , ... *J-.-7-,-, , * * , - : .: ... : ... : ... : ... . ................... ... ....... : ................. ....... , , * ... * : .... .... . ... ..... ..... c .4.0 ... I ...................................... �: ................................. � ..... : .... : ..... ..... �*-: ... : ... A . .... I .: ... I I .... . ---..1.....1-.1...-f ......... : ......... : .... : . . . , : : : � ! : . : : : : : ; : . .... : ... ...... . -4- : : : : : ss: e:con It : ..... : . . , .... 7 , . : . : : I . : : : pme 'orvi,f,Ic : -: ... : ......... .... : ... : . . . -77 : : . . . . . . . . : . . . . . . . : . . . . . . . : . . . . . . . . . : . . . . : : : : -7-7 . . . . . . . . . . . . . . . : . . . . . . . . . . . . . : : . . . . . . . . . . . . : . . . . . . . . . : . . . . . . . . . . . . . . . . . . : . . . . . . . . . : - - - - . . . . � . . . . . . . . . : . . . . . . . . . I . . . . . . . . : . . . . . . . . . : . . . . . . : : : ; I . . .... i It. * , , * * , ­ : ''' , ......... .... : .... .. ri!� *efx,i*st I ..... .... I : .... ..... : . I ....... . . . . 7 : . : : : . . . . . : . I . - I . . I : . . I . . . . . . : . . . . . � . : : . . . . . . . . . . 4 III ' i : : . . : . - : : : i� . . . . . . . . . . . : . . . : , . * . . . . , , : , : : , ...... :.. I ;: �0 : : :: ..: ............ -------+-'-'.7 ... :.111 ......... ----..,-+-,- : : : : ! I - : : : : : I ... , I . . . . : .... .... : I ........ : ......... ......... : .... I .... : . ... ...: ......... : ......... ......... : ......... : ......... : ...... : : : I � : . .... : ........ : ....... � ... 110 .... : i ....... . . . . : : ... : ......... : ......... ...... . : . : : ; : * : : : - - - ..... ...:.. I ..... I : : : ..... : . .: " : : -�-,��-." . I ... V ......... . ...... :.. - ...: ......... : ......... :� ......... : ......... : ... ....... : I ........ : ......... : ......... : ......... : I ........ : ......... : ......... : ......... : ..... � .-::-7:25.+ v --�-'-7,:25 *-� \�/2255/1.26­---� 'i-�..'J ' : .. ..::: .... i . I ...... : I :1 . .... � � i -I- .. . : ......... ! ... � : : : : : ...... : - . : : : : : : 'T " . : � : , : . . . : ; : : : : : : : : : : : ..... - .. ... z ......... : : : ...... : ......... : ......... : ......... : ......... 0 ..... � ... : ......... : ......... : ........ : : � . . I . � -- 11 * - - : , : ......... : ......... : ..... t ............ ...... :� ... I .... :.- .... : : : i . 1! ... i : : : , ; ......... : . '' . . : . . . . : : : : : �: : : ; : : : : - : .. : .1. - : , - : .: .................. : ......... : - : .... : ........ : ......... : .... : ......... : ... 1 �A ' '. ' I * :-.'. ­ : ......... i ....... I ... : ... ::. 1. : -.;- ��� - : . .... : ....... 11 .... . : : ......... : ......... ; ....... : : ......... ... : ......... : ......... ......... : ........ I : ........ 0 ..... �- . : ......... : ......... : I ........ : . ..., ... : ......... : ...... I : - - : : i : : : : : : ; I : . . . -�s - " ,3607-T,/.(T. 4- - 5 ) - - - 0QoT -=. 3607x � 7.; 3/ (.17..3 -4- 25.)-40xl:2'6' : ,.,:: ::*:, : : : : : : : : : : : ; : ---:-, ..... : .... . 4 . . I . . I ... : ......... : ......... : : ! t . . .... � ... : . . I ........ : ......... : ......... : ......... : ......... : .... I .... : : ........ : ......... ; ......... : ....... ......... : ......... : ......... : ......... : xl-7.,3 - :: I - -1- : -1 ..... : ....... , : 4 : ...... : ......... : ...... . : : : : : : � .1-:1 ........ : ......... : .... i .. 11 I- I ... : . : . : . - =604 ,cf/ac- ..... : ........ : .... : ........ ::.- I . : : : : : : : ....... ....: .... : : : t� ....... : : : : : : : . 0 * * I I : ......... : ........ Ld ..... - . : - ....... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ...... i. . .: ... I .... � : I .... : : .1 ........ �; ......... ..: ......... : ......... : ......... : . : : : : : : : : : : : : : : : : . I ! ... 1. : ......... : ......... :: ... ...... : ......... : .... . . . : : � : : ...... 2:0 :LF:: :' * ' ' ........ I .. .... : ......... : ........ ... I ......... : ......... : ......... : ......... : ......... : - ....... : ...... - : ......... : ... : : : -!.....- * ...... I - - : ........ .. : ......... : ......... : ......... I ............. :: ...... ­. :: ....... q .. ... 0 ,� . : : : . . � ..... : ......... : ......... : .... ,e : . . . . I : : .... : ... I ... - : : : : : : . : : llz� I I I * I : : : : : , ,61-.,a�g.*e.,...�,..b..i.�ih.,�..,.t-.6.ci.u.i,r...� .,d* ............................. 1 : . . . I-, ................ I ... :�;, ......... ... I ......................... : : . -.� : : : -P .. . ... t .............................................................................. : ....................................... : ....................................... : ........................... � . : .... I ...... I ...... � .................... t ....................................... : ............................... . . :-1111:1111 *1*1*1"**",*""*""***,*'*****"*,*"***""**"",""*"l*":, I 1-1-1-11-1-1- ......... : ....................................... : .......... i ....................................... : ............................ I .......... : .......................... I ............ : ...... . .... :M , . -.c.6.5= .... . .... 1 .. .................................... : ....................................... : .......................... ....... .... S . .......... : . ..... 'o'....-, .*.. O.: - .3 '. . ....... : : : : ..a.-O-11. -*4� ..... 4b *- . ... ... * ... *...,. .. " # 0. 4...'x'.Q.'.. , , � if��c -.5 : ....................................... :- ... I .. ............. -1- .... - k.- : . ... ... :315 - . ..... * : ! : I ............ I .......................... : .. . ................................ :� .............. : ... : ....... :11 ..... :1. ! t : : : : ......... : ....... . : -t .... : : . : : : . . ... : ... : ...... : ......... ..: ........ I ....... : ......... : ... : : : � : - . ! :* ...... : ..... I ... : ......... : ......... : .... ......: ......... :. ..... ... :.... .: : : . ...: ......... Z ........ .. � ...... : .... I .... : ......... : ......... : I : : : : : I : : : : . ....... .. I ...... : I ........ : : . : : : : ......... : ....... � : ........ : ......... : .... 0 : : ...... ..... ......... ! ......... : ......... : ....... . . ....... : * * ....... : : : - N .... : ......... : ....... . I I; : : : : : ........ . : ......... : ......... ! ... I : : i : : ; . . . : : : 19' :2 * %' ' ' ' : ......... ..... : ......... : . lf,,�. 1..:" C " . : ......... : ......... : ......... : I . . I ..... : . . I * : I ... : ......... ; : ....... : ........ t : ..... . I . ... : .... : : : : : : : : (D, ; .% -, I - .Stor*age - O-V-idtd- by. .6 -LF - - .18". CMP-pipe - -= 1106. cf .... : : : : ! : : : : I ; : .. : : : : : . : ......... : ......... : . . I ......... : ......... : ......... : ......... : ......... : . I ....... : ......... : . . : ..... I ... : ....... : : . . � ...... ! ......... : ......... : . . : ......... : ......... : . . � ... � . . : ..... Ii. . . : ... .... I : .... . . : ...... I . . ; .... ' * 'r * : ... . . : : : .4 ..... . . . . '. . : , - E) ..... : . . : : ; ! . . . f : ! : : : : � : .... ...... : . . I .... : ........ : � ........ : ......... : : : &4 V -r, . . . : ......... : ......... : : t : : : : � : . : : . .... : ..... I . I . : ........ : : . ; : . ; ....... : : ; . : ...... � . . : ......... : ......... : ......... : ......... : ......... : ......... : ......... ! ......... I ......... :0. I . . , - . . : ......... : ......... : ......... : ......... : ......... : .. I .... - : ..... : : : : ...... . : : : i - - . : . .... : . � . I � .1. . . : .. ...... : ......... : I ........ ........ ..... ; ......... I , , : , : : , , * : ... : ::::. . : : : : : : , : .... ' :: e ' : . : ......... : ... ...... > ... . . . . .. . : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .... I : : . . '. . . : ... : : .e:X ,* ',!�3,j��W�e*.r� 'Manha-1: : : : i : .... ! ......... :: ....... : . : . . ......... : ...... .. : ........ : : : : . -.-.: ...... �..: ......... !,. : : : : ... .... Iro- - : Or" I -P * ,6: .... - :: : : : : .... ........ : ......... : ......... : ......... ; ......... : ......... : ......... : ...... : I .... : ...... . : : : : : : : . : : . . ; , : : : : : : : : . . : ......... : ......... . . . - ... : : : : : . . - : ...... ... : .::, ..... : ... - ... : ......... : ......... : ......... ......... : ....... - : .... ;0. . co : : : : ..... : . I ....... : ......... : ......... ; . . I ... : ......... : .... ... : ........ : ......... . : : C. ........ ; : : : : : I : : : : : : : : .188 ....... : ......... : ......... : ......... : ...... 1 ............. : ....... . ­ ': * * '' :,.: - : .... ::; ..... : ......... : ........ ... I-: I ........ : ......... : ......... : . : : : : : : . : ... : ........ :: . : ......... : ......... : ......... ; ......... : ......... : ......... : ' ' 0 PT I P)' ' : : : ......... : ......... : . ...... : ......... : ......... : ........ � I ....... : ......... : ......... : ......... : . - ... I .1- : ... .... 1. : . - ..... : .. I : : .... ...... : ........ : : : : : : :,4,zt - : : : .9 : ....... : ......... : ..... -, : : : : : , : ......... : .... ... , .1. . ; ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ...... � : - : I : : : : ..... : ......... : ......... ; .............. .... ... .. 1. . : : : : . . . . b'-:dd4'�/!�gH- ' : ­ .......... :: .' *­ ..... : : ! : , : : : : : : : : . � : : : : : : : : : ; : .. : ......... : ......... : .......... : : : : : ; ......... : ......... :: .... C. 0. . I :: ......... : ........ I ! ... I ....... \ : ......... : ........ : I ....... ........ : .... I .... : .. ....... : ......... ; ......... : ......... : - ...... : . .... . : . � ....... : ......... : ......... : .... I ............. . . I .� : : . ....... : ......... : ......... I : : : : : . J -=:1.-26/-(-0-.63k\/2x32.�2xq -) ........ ; : : ......... : : : : : :3r : : : � .. ..: ....................................... : ............ I .......................... : ................ I ...................... : ............ -.."--qt ............. .......... : ................................... (D-1-1 .......... : : : : ! : -): -A .... =,-;-0-;--1-4 .... s-P ............ : ......................... . .......... I ......... : .......... � .......................... :: : : : .... : ....................................... : ....................................... : ....................................... : ............ . . , : : - 30 I .... - **:: - - -, I ........ : .... -* : '' ..... * : ­­­ , : ­­­ : ­ ..... * : ... * ........... I ............ ENGINURING ............................ : * ... * * ... : , * * , * , * , , : ......... : , , , ................... I ... I ............... :: .......... I ................ I ........... : ....................................... : ....... : .................. .. I I : : : ..... : .......... � ......... 11: ..... ; ! .... ........................ I .......... : ....................................... : ....................................... : ......................... I ........ : .............. I ........................ : ....................................... : ... ............................... . . I : .................................. : ....................................... : ............................ ... ... .. I : : : : : : : I : . . : ..Z ...... . � . ..... . ! ......... : ......... : ......... : ......... : . . I ...... : ......... : ......... : ....... I . ..... � : : : : I ......... : ....... : ... :-: .... ----* .... ..... # : : ....... : ... ..... : I ... I .... : ......... : ......... : ... I...., ........ : ....................................... : .................... � ............. ... � : . .............. : ................. ! : ; : : : : : : : : : .... ; . . I ...... : ........ : .. -1 -i nO ......... : .... I .... : ......... : ........ : ......... - .. : ......... : ....... : ... :: --- : I : : : : : : ; : : ! : . ... . . . ....... : ......... : ......... : ........ I . : : : : eX., * s .. . .. : ....... . :E' - - . . � ......... : ........ I : ......... : . I ....... : . . use : 2 ,S/e"*d*J amj�ter- or,, I f f de , - I . I . . ; .... I I ... ! ........ : : . : ......... : ......... : ....... --;--:-.:-�� 1-1 ... : ......... : ........ --!.- ; ......... : ......... : : : : . . .:-. - �---.:.-- - - -��A --+.----- : : -7---�: - - - - --- : : : : : : : : : : : ' * .... 6tAtidt; 'to� .... :: ......... : : ! I � : ... � ... ; .... . I : . . ! ... ....... ..... _____4_____- �: . ---..-.----�-. . . . . ....... . .. . . : . : I 11 ...... ! - : ....... : ......... : ........ : - _ -T- .... : - - * * * I I I - : , : .... I .... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : : : ..... : : : .... ! ... ..... : . . � ... I . 4" I ....... : . .. . : : : :W. ... I ; ........ . . . . I ...... : ......... : ......... : ......... : ........ : " ...... *the: it ' *m. �s ... : **** ............... : ...... : : : : I : : ...--t - - - - - - - -- Ir : : : : : . : : .M .;. - ; : : : . : : : : .... : ......... ; ...... � . . : . . : ..... : ......... : ......... : ......... ; ......... : ......... : ......... : ......... : ... , , : , I * * , , . : ......... : ......... : . I ....... is or%. ewer -.adjacent ::to. ' V , * �. : . ....... ....... I . : I ...... 1. : ! : : : : : : . .,�* : : . : : : : . -th.1s. pr%0ject.on - a.,Inu. , St.. . : , - , , * , * * , t * , , * , , * , , : , , , , * , - : : : : .... : ......... ... ... : ......... : ......... P. � , , ,.-..* . t ......... ; ......... I ........ : ......... : ......... : : ; . : : . : : : ......... ....... : ......... ; ......... : ......... : ......... : ........ I : ......... : ..... -: : . : ......... : ......... : ...... .... I . . . : ...... - : ......... ! ......... : ......... : : : : .... : ......... : ......... :- : : . : : . ... ......-.: ......... ; ......... ! ......... I : : : : : : M -4 ... : : : : : : : : ! : : : : : : : : ......... : ......... : ... : ......... : ......... i .. . ...,.. . : ......... : ......... : ......... : ......... : ....... I . : ......... : ........ I : ......... ....... I : ....... � . : ......... : . I ....... : . : : ..... : ......... : ......... : ......... : ......... : . . : t I ... : .... I .... : ......... :I ... ......... : ......... : ......... : . : : : : ........ : ......... : : : : i : : : : : : : : : : : : : . : .... .....: ......... : ......... : ......... : ....... : ; : : : ......... : ......... : ......... : ......... : ......... : ... QL- - - 1 . . : ..... 1. - . .: ......... : ......... : ......... : ......... : ......... ! ... ...... : ......... : ......... ..... I . . . : ....... 1. : ......... : ...... ... : . : : : � .... : ....... I.: ......... : ......... : ......... : ......... : ........ 1: ......... : . : : . . . ........ : ......... ........ : : : : : : : : : : : : : : : : I : : : : : .: ......... : ......... I ..... : .... ...... : ......... : ......... : ......... : ......... :: ......... : ......... : ... : : . . : : . ...... : ....... 1. : ......... : ........ I : ......... : ......... :: : ............. I ! ......... : - - I ...... : ....... : ......... : ......... : ......... ! .... ....... I . ......... ......... : ......... : ..... : ......... ; ......... : .... I... . t ......... : ... : : : : : . : : i : : : . : : : : : : : : : : : : ; : : : : : : : : : ......... : ......... : , : : : :# . : : ....... : ......... : ......... : ......... : ......... : ......... : .......... : ......... : ......... : ......... : I ........ : ... I.... . ! I . I ...... : . ....... : ......... : ......... : ......... : ........ I :: ......... : ...... .. : ... I ..... : ......... : ......... : ......... i ......... : ......... : .......... : ......... : . , � 1::� : ; ......... ! ......... : ......... t, I ...... :.. - : . : : : : . : : : : : : : .. : : : : . : : : ! : ! ! ....................... ! ............. .... ................ .... : .... ...................................... ... ........................................................ ..... ........... I ......................... I...., ...... I. ... ... .... : ....................................... : ....... -.. . ...., ..................................... : ....................................... : ....................................... � ....................................... : ............. I ......................... : ... I .......... I ......... : .............. ....... I ... : ........ I ....... I ... lim.!!e ..... : : : : � ; i � .......... - ................................ .: .............................. I ..................................... � ... .... I ....... I ................ . ........ : : : .25-1 ....... i - . . ................................ :... ... : ........... � ........................... : : : : z : : : : : ; ; . : ....................................... : ............................ : ....... ..... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : ......... : .... 111. .: ......... : ......... ; ......... ; ......... : ......... ; ... I . -P-i : ! ! : ! . i .... : ......... ::::: ..... ! : : : : � .1 : ! : . - : :.: ......... : ......... . ............... :. . : . . . I ... 1 .... *-,:::: ....... : ......... : ......... : ......... : ......... : ......... : ......... ......... .... : ... I-- . : .... I .... : ....... ; : : : ; : ! : : : : : : : : : : i - ....... -:.- ..: ......... : ......... : ......... :. : : I : : i : .... : ...... I-: ..... : ....... :. . : : , ........ : ........... .: ......... : ......... : ..... I ... : ......... t ....... - : : : : : : ! : : : : : ; : : t : : : : : . ..... ......... : .......... ; ....... I . : ................. I ... .. ... : .... 1. .. . ; ......... : ......... : ... : : � 1. . . ....... I . .1 ......... % ......... -0 .... : ......... : ......... : ......... : ......... : ................... : ......... : ......... : .... : . ...... : ......... : ......... : ........ : : . I : : . I .: ......... : ......... : ......... : ... t : I ! ' . . . . .. 6"M qf*.16!-#%,,, . . . : : : : : : : : . . . . . . : . . . . . . I . . : . . . . I . . . : . . . . . . . . . :: . . . . . I . . . : . . . . . . . . . : . . . . . . . . . : . . . . . . . . . ' ' . . . . : . . . : . . . . - . . : . ........... I ... I .... : ... ..: ..... : : : : : : : : : : : ....::.. : : , , .............. ............................................ : ......... : ..... ...: ......... : ......... : ......... :... ...... : : : : : . . . . . . . . . . . . . : . . . . . . : . . . . . . : . . : . : : : : ...... :.1 ... ... . ...... : ......... : ........ : . . . I . . I -- i� - : ; : ; : : : 0 : I I �J- -b - : . . . . . . : - k- - - - .. ... - - - : i:N - . . . . . ....: ..... � fs. . :: I ... I . : ' ' * D, -/?- : .... . : : .... . : . . . . .,.!. �� .!.: . /', . : � : . . .... . . .. I . . � . . . ... . .. . . . . . . ... ... : . . . . ...... : ... 1. ... : . . ... I . � ..... : .... I .... : ........ : , , : : 0 : . : .... I ..... : ......... : .... ...... : .... 1-11 I : :: -.# ) I .. . .. I ............ : .......... : . . ... . .. . . . . . . . . ... ... : . . . . ...... ; ..... ... : . . . : - ... 11 . : : : : : : : : : -i . 1q" . : : . . . . : : : .... : ......... : .. , , ... ­ , * * : , , * *: , ­ , : ''' 'm : . I Q. . - :no - : . : : : : : : : .,;� .. , :.. :.. , ..: ...... I ........ 88450 : : : ......... : ......... : ......... ..... : ... . . � -�-t, . -RA- - :--PROFILE ... & * ''S'T'REE IONS .. .. ...... I-: ......... : ......... I I ` ... ' : ; �- , . i- M D . :-C-0.LU-M---,BJA-LA-N-D -;S�'::U:,;R.,��:VEY*I'NG''.&.'-''*'E'N*G'I"""E'E'R'I':N'G .... * S'T'C P.- - ''' I N- , "I".. I ... :11-1-1: -1/ : * * , , ....... . . . . : : Ii., , . . ...... : I ........ : ......... : ........ ..: ......... : ..'s... ... ........: ......... f ......... : ......... : ..... I ... : .... : : : : : : : : ....... ...... 1 ......... : ......... .. -0 . : ....... . : ... : : : : . : : . . . . : : le I : . - . .. : : ..... : ......... : ......... : ......... : ......... : ......... : ....... I.: ..... . -: ......... : ......... ......... t . - 9" : - .... : * ........ : ........ : ...... ... : .................... : ......... : .... .... :.. ....: ......... : ............... ..: ......... : ......... : ......... : ......... : ......... : ............. .... I I-: ......... : I ........ : ......... : ......... : . : : : : : : � ; : . :;::, ,�� * *. * '' : : : : : : , : : : : : : : : : 'r, 'O' .. . . . :---�,:* ...... : ......... ...... I : : : . : : : : : : : I : : : I - : : I ..: ... I . ...: ...... : ..... ... I ......... : ..... � . ....... :. ... � ... ................ : ....................................... : ....................................... t ... ... 11 ................. ..... : ..................... . ................ : ....................................... : ....................................... : ....................................... : ....................................... : ................................. : .0.;=.61 ........ ft-in .............. : - .......... - ............. : . ............................ : ........................ ..." ... I .... I .1: : : : . 2 0':: ­'* .... :** : ­ . . - ... :1 ......................... � ........... : ....................................... : ....................................... ; ......... : ....................................... : ....................................... : ....................................... : .... : ....................................... : ... I ..................... I ............. : ....................................... : .................................... ... ............ : ............. I 00 ... ***,,;* ...... : ... I ... ....... ..... : ........ : : : ....... I:-, ..: ................................ I ...... : ....................... : ... : ... : ... : .:..., ..: ... * ... : : ............... *0 .... .... 4- 4 . .............. ................ .............................. ................................... ..: ...... I ............... . i ... .. ....... .. ... ... 1: . . -.11 -.1 . . : : : : E36 . . I . : : : : . ; . . . . : I : : ; : ....... : ... :..: . : ...... I..; ......... : .... : : : .. : ... 0 1 : : : : : : .... I . .,C� .... . . -. .011. ..... i ......... : ......... ......... : ......... : ......... : ......... : ......... : ......... ......... : ..... ... :. 1. . . . . : ....... I.: .... .... .. . : : : : 0 1 Z . ........ : - : : . : : I i : - . ..I, . .N. :: ...... . .... . S....... -.... .1 ' ; : : : : ..... . . I.: ......... :. I ....... ! ...... . ..: -.... : . ... ... . : : : : : : . I : ... . . . . . ........ : ......... :: : : : : : ­ : !,:::: - * , 9 9 1 , - I , , , , :- :1 -*-, I I I . , - vk� .111 1! 1: ... . . : .... - - - - -: -:. . . I.: - . . : : . . . . ..... . I.: ......... : ...... ...:. I ..... I.:::: ...... . ..: : ..... :. . : : ­�­­ : .... : . ..: ....... : . . ... . .. , .. . : .. I -* , - : ... . . . . . .:. . : : ; : - ; : : . : : .1 : , : ...: : . : : 0 - . : :0. : . : .... : ......... :: ... : ......... : ........ : .. . .:.. I ... ......... : ......... : ......... : ......... : ......... ::: . 1.92g..: *..:..l ........ . . -f : . . . I . . : ... . . . . . ... ....... ..... ..... ... : ... . . . : : : : : i", t . : - 0: :'32'0: ... WALNUT— STREET''--:---': I .0 .... . : ;.. - . ;0: .... : : ..... ..... : ......... �:: .. . .. . .. : - * , ''.:::: , ..#. .. . .... � i.,.: ..... . -F0-R`--- - -:3: ... U:N--I-T­;APT:-- @ *: : : i � : ..... PHO"E: : *:: - .: - h- 1: , ... :1 05': ...... 2:2'8:t ' 11'.''' * S ''' . .1 I : 4 : : 4 , : ......... : .......... : ......... : ....... : ..... I ... : ......... : 4 . : : : . . , : .... : ' * ' . : . . :: : : : . , I : 1�' : : : : : : . , , ;�. . . : - ...... : ... ........ : ......... : ....... ! : : : : : ..... ! ......... :.. . : . I . . . . . . . . � I "STEVIV9..., 0 : ......... : - - - - - - - . . . ... : ......... : ......... : I ........ :. I ....... : ......... : ..... ... :.. .. .. ..3, , , , , i .... - - : : : : : .. : * : : : : : : -: .... . : .9 .:. I ... I ... : ......... : ......... : ......... : : : . . : : 1 ... ........ .... : * * * - - -:�,,::,: . . ...... : . . . : : : * 14...,.#W.��,, hdd-,t'* 3 * bf : : :::: 'I., -.., * 1 , , , - . i ......... : ......... : , , : : : : ; I ... : ......... : ......... : : ........ ......... : . . :.. - � ... :.. I ...... : ......... : ......... : ......... : ......... .... I-: ......... : ......... : ......... : ......... : ......... : ..... ... : ......... : ......... : ..... : ......... ; .... : : : : : : : 11 : : : : I . .... ... ! ! : : : : . . E,4,6NV.,-1.-!-: .......... : : . : : : : : : i .... : : : ......... : ......... : ......... : ......... : ............ ....... : ....... I �: ......... : ......... : ......... : ......... : ......... :: .....:.. ..... : . . . . : " ; : ; : : - . : ......... : ......... : ......... ; .... . ....... : ......... : ..... .............. : ....... I.: ..... : ......... :.. : : : : ,�,1,:""-%,:: !::: . . .. . *:1 . I. .:: ........ : ......... :.... I .... : ..... I ... : ......... : ......... : .................... : ......... : ..... .. . . .................................. : ......... : ......... : *- : .... : ......... : .... : : .... : ......... : ......... : ......... : .......... : , - - * *:: !:::,, ...... : . I : : : . .... : ..... * .... , . . . ..�, : : : : : : : : : : : : ! : . : � ., : : ........ : : : I ,,;�01 ; . . : : : : .. ...: .... I .... : ..... ... : ......... : ......... :.::::. ...: ......... : ........ . "' ! I : : . . : ......... : ......... : .. ..... �%%,%qb ..... : ..... ., . . : : : : : : : : : : : * : : : : . i - - ----y- - ..�,: I'll ... :. ' * ' , z ..... . : : : : : : : : : * : ... : ... I : . . - . . . . .... . ......... ......: ... : ... : ... '.. . . . ................ I ......................................... I ............ :1 ................... : .................. : .... I ........................... I ....... ..: ..................................... : ... : ... : .......... � ......... 1. .... 'C. J--J F ... - - -()---'-J ...... * .... . ....... ! ............... . . . . . .... . . .*:.'' ...:..... . : . . ....: ................................... I ....................... I ..................................................... ................ ........................... : ................. I ...................................... ..: ... IPI ... I.... . . .... .... M--'--I: ... * --'----,!--'--E-----L .............. 2-1` 0 .. ..... i ... 6 .... *-t-*h-'---* ........ A--'V--E ..... . 6" ........... W--'--o* .0--m-0-N. *08* , , , , '': * * , , - * '': , , - * * * , *:, , . : , 4....: ... ... ... W--A-----0: ................. 9-8-0-4-3; . ... ------- AK - 4'. "I '�- - . "' --N'-N-:E-:O-* ... ' ... * ... & .................. ' I ''I .... : ... :.: . . ..;.'. .... ...... .... 1. - -E.:R --" , ---'M-0**UN:-T'L-' JE: ... * ... :,,,*T,* '' --'R----A-,----C E I �! 97534 II-&,Xt HERCULENE' SATIC FREE DRAFTING FILM Wir f4-- CRYSTALENE'li ,,,,r,.. ,,A,E. ' SJATfLE ARANCH 007 PAIYEAN No I 4� EX. 613 50 51) NINV,TOP 55.51 6 53.56(6"E) V V V. '53.75 (12" 5) I I - 53,51 (5`W) I IN .53.49 (611 NE) -w EXI NG TREE TO �,El REMOVED EX15TI KOCKEKY TO E3E i.GEMOVEO TYPE 1-L 05 W1 GRATE LID TOP= 55.20 IE (N&E) 554 N z W [NEW A5P -JP FENCE 5'Wo TO 13E EMOVEP 10'00'OPKEAPEK TKENCH "Uk "r"w IV" 7,% 'w" "" v if off Lj- H, .—.—.—.—.—WALA un'T STINAIJ."L. 6) 13ENCH MARK .-L-EZ,C5 .—.-w .---W ---w ---w ---w TOP 56.33 INV. 54.10 (12"N) INV, 54.05 (5115w) T.D.R. TYPE I-L ®r TOP= roo.00, -NEW51PEWALK IE (W) = 55.0 Y AA [a Ilk -8�� i ---i JR.9 —0- - EXIOTING 6WOOD FENCE ALONG C90UTH AND WE5T!31[)E PROPERTY OF PARCEL 13. TO DE REMOVED. EMOTING 5"OPRUCE TO 13E REMOVED I ._w ---w ---w ---w EX15TING 6" PINE FTO 13E REMOVED I 13o.00l N 89044'1411 E TOP:64.50' TOE:62.50' 50 ---51) APPROVED AS NOTED BY ENGINEERIN"- Date: 12LANTING 5GHEPULE AZELEA: 5 GALLON 5EMPERVIREN5/ ITALIAN CYPRUS& 6-10' TOUGA MERTEN51ANA/ MOUNTAIN HEMLOCK- 6-121 PINUO NIGRA /AUSTRIAN PINE: 6-12' ®R ACER CIRCINATUMIVINE MAPLE: 5'-10' CORNUO KOU5A/ KOUSA 'W, 000: &-10, GINKO 1311-013A'PRINCETON 5ENTPY'R5 MAIDEN HAIR" 5'-10' street trees must have a 2" caliper 0' d M VEM "MrMI f , otr I a n 0. UMMIT ASH: 8'-10' street trees must have a Z' caliper & 61 brane. I t2tftWL12ed?f3tdMUL— M PYRAMIDAL& 5' VIBURNIUM PAVIPII/ DAVID All, VIBURNIUM 2 GALLON 13ER13ER15 THUM / ROYAL f3UIZGANDY 13AK13EKRY: 1 GALLON HOOTA: 1 GALLON PHORMIUM TENAX KUBKUM NEW ZEALAND FLAX: 6 GALLON RHODAI)ENPRON/'UNIQUE': 24"-30" CHO15YA TERNATA/ MEXICAN ORANGE: 5 GALLON PRUNUO LAUROCERASU5/ OTTO LUYKEN; 5 GALLON VINCA MINOR: 4" POT5/ 24" O.C. LAWN AKCT05TAPHYLOS UVA-URSI/ KINNIKINNICK: 4" POT5/ 24" O.C. CISTUO 5ALVIFOLIUS / SAGELEAF ROCKROSE: 1 GALLON/24" O.C, FTC7 IRRIGATION CONTROL PANEL ro'CEPAR FENCE LIGHTING 5CHEDULE 100 WATT MAX PORCH LIGHT HEIGHT: 7-0" STYLE: CASUAL 13.5" HIGH 964,5CV OUTDOOR CANYON VIEW BY KlrHI FR KROI 11 Y L G M GARBAGE ENCLc,-'.Ic.!URE DET A IL 6CEPAR GARDAGE ENCL05URE 1X4 FENCE [30ARL) I U z 0 U 0 LU LU U z (D 0 w as I— I 0%.e W, REVISIONS: 11.06.08 UIN I EV: .06.08 RESUB NOV 10 2008 BULUNG '%FmA'W'T crryoF oN STREET FILE REBUB Moll 10 EX. C-13 50 - TOP 55.51 I INV 53.M(a)JE) V V 110) 55,76 (12 1 53,51 (611 W) I IN .53,49 (511 NE) —W EXI NG TKEE---/q TO �,El KEMOVED EXIOTI ROCKER.Y TO 13E �,CEIVIOVEP TYPE 1-L 55 W1 CRATE LIP TOP� 55,20 IE (N&E) 551 LU Q) z 19 00, NEW A5PHALT ALLEY e5, 5'WOOI[) FENCE TO 11E EMOVED . - 51) — . _91) — - _51) — - — 5P — m _51) — - — 5r) — - 11C EX15TING 6"51"RUCE DENCH MAU TO E3E, KEMOVEL) i C 5 . — .—W .---W ---w ---w ___w ___W _._w _.—W ___W TOP 5 0.33 INV 54-10 (1211N) MOTING 0" PINE INV. 54-0.5 (6 115 TYPELl-L TO f3E REMOVE[) TO P = (65- 0. �O 0 IE (W) E555.0 IS 4471411 E .......... W-) 0 w - _51) _. - 51) - - - 51) EXI5JNG 6" CEPAR. TO 13 REMOYED rtvlq ri EXIOTING 10" CHERRY TO 13E REMOVED TOP:66.25' TOE:64.25' 59.00, Amm 510 Er", U�A 21 7.001 N, 3.0'X3.0fN DING iOWN IN F �X. 7" R101 TOF:64.60' TOE:62.60' 30.00 1 '.04 -MOVE EX TING 3'KAIL F NCE TO PKOP INE EXIOTING 14" PINE __W w W W W W W JLJ W W V 30.001 PLANTING-5CHEDULE FRAXINUS P505YVANICASUMMIT OUMMITACPH: 6-101 9 street trese must have a Z'callper & Go' �ratichimg to avoid Gomflicts wi peclestriame. GINKO 131LO13A'PKINCETON SENTRY'P5 MAIDEN HAIR': 6-10' 0 street trove must have a 2" dallper & 01 1;ronching to avoid conflicts wl pedeetriame. ACER /JAPANEOE MAPLE: 6-10' ACER /LACELEAF MAPLE: 6-10, ACER CIRCINATUM/VINE MAPLE: (3'-10' MAGNOLIA OL./LITTLE GEM: 51-10, TOUGA MERTENOIANA/ MOUNTAIN HEMLOCK: 6-12' -0 H 5EMPERVIRENO/ HINOKI CYFRE65: 6-101 6EMPERVIKEN5/ CY 55: 5,rlo, 0 PRUNU5 LAUROCERA5US/ OTTO LUYKEN: 5 GALLON CHO15YA TERNATA/ MEXICAN ORANGE: 5 GALLON RHOPADENDKON/'UNIQUE': 24"-30" E5CALLONIA F.: 2411-3011 PHORMIUM TENAX RU13RUM NEW ZEALAND FLAX: 5 GALLON V113URNIUM PAVIDII/ DAVID Vlf3URNIUM 2 GALLON AzrLEA: 5 GALLON 13ERDERIS THUN. / ROYAL 13URGANDY 13AP,13ERRY: I GALLON + 13LUE OATORA55; 1 GALLON/24" O.C. CAREX VARIGATA: 1 GALLON/24" O.C. 13OXWOOD HEDGE: 1 GALLON/24" O,C. THUJA F'YKAMIDAL15 PYRAMIDALIO: 5' YINCA MINOR: 4" POTO/ 24" O.C, AKCTOOTAPHYL05 UVA-URSI/ KINNIKINNICK: 4" POTO/.24" O.C. LAWN H HOOTA: 1 GALLON C=ROCKERY FTc7lKRlGATION CONTROL PANEL 61 CEDAR FENCE LIGETINC 2 5GHEPUL 100 WATT MAX PORCH LIGHT HEIGHT. 71-011 5TYLE: CAOUAL 13.5" HIGH 9045CV OUTDOOR CANYON VIEW BY K Ir.Hl M? RECEIVED OCT 2 7 2010 DEVELOPMENT SERVICES COUNTER APPROVED BY LANNI G z U 0 z 0 U 0 lr_ cq LU 0 LU cl) U Z 0 j < Z y) to ON U 0 Ul) C) Z U 1 0 1 - # I w %,.0 REVISIONS: 11-06.08 01-27.09 06-15.09 10-14.10 10 OCT 2 7 2010 BUILDING DEPARTLIENT 0rFY OF EDMONDS EX. CB EX. CI3 TOP 55.51 TOP 63.47 NV. 53.86(8-E) INV. 60.901 NV. 53.78(12-S) INV. 60.1 INV. 53.51(8-VO INV. 50.1 INV. 53.49(8-NE) EX SS�Ij TOP 56.39 NV. 42.11 N) WALNUT STREET 42.16(OUT W) S6 SD SPECIRCA77ON FOR , OPTION. CO it XDIA CUP-16GA 121,pig�A EENNDD w 2 % x Y2 fEGAWN ALUMINIZED w 7 338.75' STEEL OR 'tPICHOMPEGIREA 7ED. 2* RGV"X 2 RGV` Ss N 89*44'34" E t 110 0 . I SIGN I INV. 61. . 73(12'N) CDCDCDO ROCKERY 0. nt, MIMMUM KtWUNYMNI - UIMM 11i Ab MWIVIMU BY I'M CITY, OTHER APPROPRIATE BYPS TO M1776-ATE 0* �_Ex W Eap. INV. 61.53(1 THE &TECTS OF INCREASED RUNOFF SHALL BE APPLIED. OIL Z. f 0 alT &CAP %VATER CAP WAIIER SERVICE 93VAULT 8 6. EROSION AND SEDIMENT CONIROL REQUIREMENT - UNDERGROUND U77UTY CONSTRUC770N. THE C0NS7RUC77ON OF 10.6' AT THE MAIN. I PR-O-P-DSED UNDERGROUND U77UTY LINES SHALL SPECIRCALLY ADDRESS THE FOLLOWNG. cn EX. CB @ S70RM DRAIN MANHOLE . EROSION CONIROL. FOR EXCAVATED AND STOCKPILED MATERIALS, r a THE PLACEMENT OF EXCAVATED MATERIAL WERE CONSISTENT INTH SAFETY AND SPACE CONSIDERA77ONS WALL BE Cn .0 INV. 61.87(8'S) 0 CATCH BASIN PLACED ON 7HE UPHILL SIDE OF TRENCHES�' > INMERTICULMERT C, TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT 7RAPS, SEDIMENT PONDS, OR OTHER AC15EPTABLE Z" SEUR MANHOLE MEANS)v MU T.O.R. o D. IRACKING AND SPILLING OF MATERIALS ON SIREEIS DUE 70 HAWK 4� CA C! 12W FIRE HYDRANT 0 E DAILY CLEANUP AND STREET MAINTENANCE. p p (14 0 (0 . 7 a WATER MEIER 0 Cj H VAL W Z ADD177ONAL ESC MINIMUM REQUIREMENTS FOR LARGER DEMOPMENIS, ALL NEW DEVELOPMENT AND c76 REDEVELOPMENT THAT INCLUDES LAND DISWROING AC771#77ES OF GREATER THAN, OR EQUAL 70, ONE ACRE /8 . ... / 1 3., r- \'__4 BEND ADD177ON 70 MEETING THE MINIMUM REQUIREMENTS SET FORTH ABOW SHALL COMPLY WTH ESC REQUIROWENIS LISTED _171 'A 7FE BELow ),64-50 0 THRUST BLOCKING 1;1�21�06'2506 8. ESC MINIMUM REQUIREMENT - DELINEATE CLEARING AND EASEMENT LIM17S IN THE FIELD, MARK CLEAPING L107S 10% C) REDUCER I MACE DROP MD10R ANY EASEMENTS, SE79ACKS, SENS171VE1CR177CAL AREAS AND 7HE BUFFEM% IREES AND DRAINAGE CRIRSES. 3 13-S) RAISED CAPAUG OR MECH. JOINT SHALL 9. ESC MINIMUM REQUIREMENT - SEDIMENT 7RAPPING. PRIOR TO LEAVING THE STE, STORM WATER RUNOFF C" 70 1 6 (4% C PUSH -ON JOINTAUB PASS THROUGH A SEDIMENT POND OR SEDIMENT IRAA OR 07HER APPROPRIATE' BYPS SEDIMENT PONDS ANP IRAPS; TCH EXIST ir3 OW WALL # COUPLING PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER BMPS INTENDED 70 TRAP SEDIMENT ON-97F SHALL BE ROCKRY C0NSIRUC7ED AS A FIRST STEP IN GRADING, THESE BYPS SHALL BE FUNC77ONAL BEFORE LAND DIS7URSING !-HIGH CA CAMCM ROCKERY A017W77ES TAKE PLACE. EARM S7RUC7URES; SUCH AS DAMS� DIKES, AND DIVERSIONS SHALL FE SEEDED MD MODULAR BLOCK WALL MULCHED ACCORDING 70 AN APPROVED TIMETABLE ey r rriowi^ q 5"CH RY CP 10 ESC MINIMUM REQUIREMENT - CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE DESIGNED AND -EX_9L_ I .. � �X W TaR. -X- FENCE CONSIRUCIED IN A MANNER 7HAT WILL MINIMIZE EROSION. IN ADDIIION, SLOPES SHALL BE STABILIZED IN TOP 56.53 EX C13 XVT & aV THE CLEARING LIMITS ACCORDANCE WTH ESC REQUIREMENT Na 2. INV. 5.9:33,3:ESI &Z. 4 523(6 2 v 'E) NV 5 ) /"� 11 ---------- B VAAER SERVICE INV. 61.74(8 :NV. 54.977t8"N) %",f- 4 AT WE MAIN, INV. 61.45(4-S MOVE C8 AR u / 1 5 It. ESC 14INIMUM REQUIREMENT - CONTROLLING 01ii EROSION. PROPER77ES AND WATER WAYS D00STREAM FROM INV. 59.1 C" / DEVELOPMENT SITES SHALL BE PROTECTED FROM EROSION DUE 70 INaMASES IN THE VaUM& VELOCIT11, AND PEAK INE NOR]. :06 .2 --66- INV. 58.85(12-E) HEIGHT CALCULA 77ON FLOW RATE* OF STORM WATER RUNOFF FROM THE PROJECT 97E SEC_nON LINE / / / '/ z x /Z z z x z z zz x z EX. TACK IN LE ) PLUG IN -60 -- - - - - 2" IRON PIPE 11' -ASING WOOD �O 10'CHERRY 1+"PI 30.00' 30.00 (SECTION CORN 2 4 k. FENCE cq 30.00 e-�HIGH CONC. 23 -- N 89*44'14" E 18 62' 338.62' 1 EX. CB N I39'4,�14' E EX. C8 b 351.36' 25 FOUND EX. IRON Pl� TOP 60.45 TOP 60.38 EXTRUD C REI 351.42'(LD) 26 WITH PLAS11C CAP cc"p 110, INV. 58.93�4-E) INV. 58.59(4-SW) 4 FOUND EX. IRON PIN NOID LSA#17970 INV. 58.51(4-W) INV. 58.88 4-YO FOUND EX. IRON IN INV. 57.71(18' E) I WITH PLASTIC CA WITH PLASTIC CAP (0.55'E & 0.10'N) INV. 57.62(18"N) INV. i 14ZAJ11-70-7n NO'D LSA#22969 IN SE114, SE114, SECTION 23., T.27 Noy R.3 E01 W.M. 18=050 DEVELOPMENT APPROVAL STANDARDS FM MOSON AND SEDIMENTATIDII! CONMM (M) PLAN, %IN LEGEND A. ESC MINIMUM REQUIREMENTS ALL AC7IW77ES NECESSITATING A CLEARING OR GRADING PERMIT AND AU U77UTY N4L----�D PROJECTS CONWS77NG OF MORE MAN 500 LINEAL FEET OF TRENCH EXCAVATION SHALL, BE REQUIRED TO CONTROL wV EROSION AND SEDIMENT DURING CONSIRUC77ON AND TO PERMANENTLY STABILIZE EXPOSED SOfL RESUL77NG FROM EXISTIN CONSIRUC`770N. PROJECTS INVOL VING A CRI77CAL AREA MA Y ALSO BE REQUIRED TO COMPL Y W7H ANY COMBINA RON OF THE ESC MINIMUM REQUIREMENTS. COMPLIANCE WILL BE DEMONSIRATED THROUGH THE IMPLEMENTAIION OF AN @ EXISTING MONUMENT AS NOTED APPROVED ESC PLAN. GUIDELINES FOR PREPARING ESC PLANS ARE FROWDED IN THE MANUAL IHE PLAN MUST 0 067ING PIPEAEBAR AS NOTED ADDRESS 7HE FOLLOWNG REQUIRSWENTS- I. ESC MINIMUM REQUIREMENT - CONSIRUCIION ACCESS ROUIE, CONSTRUCTION VEHICLE ACCESS SHAU BE, SD CA (LD) COURSE OR DISTANCE PER LEGAL DESC. VIER PRACTICAL. LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WTH QUARRY SPALLS' OR EB ICV IRRIGA77ON CONTROL VALW CRUSHED ROCK 70 MINIM12E THE IRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ON70 A EB WM WA TO METER ROAD SURFACE, 7HE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY SEDIMFJVT SHAU OE REMOVED FROM ROADS By SHOVELING OR SKEPING AND BE IRANSPORIED 70 A CONTROLLED SEDIMENT DMSAL EX. 3" BRASS PLATE FH FIRE HYDRANT AREA INTHIN 24 HOURS. STREET WASHING SHALL BE AUOWM ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. WV WA TER VAL W r0^ MA111011A DrA1110MMIT L' IMOILILMI14AY wr r-ArVXU AffCM-)- ALL aW1.0 CArV=U LIT LAW VialUMIM 160.00' -0- PIP POKR POLE AC77W71ES SHALL BE STABILIZED BY SUITABLE APPLICAIION OF BYPS, INCLUDING, BUT NOT LIMITED 70, SOD, C- GA GUY ANCHOR H?EIROSEEDING, OR OTHER VEGETATION, PLASIIC COVERING, OR MULCHINa ALL BYPS SHALL BE SELECTED, DE-9GNED, EX. CB C4 AND MAINTAINED IN ACCORDANCE Iff TH THE MANUAL 7HE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN TOP 56.33 ci NV. 54.10(12-NII) VN -X-X- FENCE APPROVED TMETASLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TO DAYS MOM OCTOBER I NV. 54,0B(i TO BE G XA70 \0p aEARiNolowwo uws-\ !4. 'IN THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY I THROUGH SEPTEMBER 30). G _'_v7 - i I (A El CB CATCH BASIN I - - GAS LINE I ESC MINIMUM REQUIREMENT - PROTEC77ON OF ADJACWT PROPER77M ADJACMT PROPER77ES SHALL BE PR07ECND T T G FROM SEDIMENT DEPOS17ION BY APPROPRIATE USE OF' WXTA77W BUFFER STRIPS, SEDIMENT BARRIERS OR'F1LIVi Ir --afg. W X CEI 4 � �64.7(�� -SW) -SD- S7ORM DRAINAGE LINE MAINTENANCE. ALL. EROSION AND SEDIMENT CONIROL SUPS SHALL BE REGULARLY EX. CEI �PAN as ur 55 55 W- WA TER LINE DIKES OR MULCHINa OR BY A COMBINA71ON OF THESE MEASURES AND OTHER APPROPRIATE' BYPS j ._,I NV. 61.82(12 n 4. ESC MINIMUM REQUIREMENT 11 '49 %V", A 1, 0 1/ All 'F INSPECTED AND MAINTAINED BY 7HE OIWER TO ENSURE CON77NUED PERFORMANCE OF THDR INTEND M7M _SS- SANITARY SEM LINE ED FUNC90N. ALL �29 Ju.uu MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE NIH 7HE MANUAL IN I 1. 01 .00' 30' 5' WOOD Ii K 17 M EE 1)u EX. CB OSSIVIH SANITARY SEWER MANHOLE VN TOP 64 03 FENCE 0) -2'-3- H 8 Ln CONC MALL/ cn CONC. Ar ._p Q r EX SPIGOT WR-`� C3 CA 0 C'MAPLE(DBL) Q) A 5 6 .1 1_1 I !SE 13.6' M .. ........ 5' WOOD 7 GARAGE FENCE RAIL y CENTER 51.30 b) 70.00' ..4 130.00, S 8574T1,i� SS. LIMITS 6 1, 7NCE 3 1 V 17.7' 77-1 EX. DRAWAGE T.al?. W. ASPHAL.TrqW011i 3' \1 .29 FEP E X�LDG 12 ESC MINIMUM REQUIREMENT - STABIUZA77ON OF TEMPORARY CONVEYANCE CHANNELS AND OUTLETS ALL TEMPORARY ON -SITE CONVEYANCE CHANNELS SHALL BE DESIGNED, CONSTRUCTED AND STABILIZED 70 Fii EROSION FROM 7HE EXPECTED MOC17Y OF FLOW FROM A 7%0- YEAR, 24-HOUP FREQUENCY STORM FOR THE DEVELOPED CONDMON. STABILIZA 77ON ADEQUA TE 70 PREVENT EROSION OF OUXEM ADJACENT STREAM BANKS, SLOPES AND DOWSTRE4M REACHES SHALL BE PROWDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS 13. ESC MINIMUM REQUIREMENT - STORM DRAIN INLET PROTEC710110. ALL STORY DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTE07ED SO IHAT S70RM WATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WTHOUT FIRST BEING FILTERED OR OTHERMSIE TREATED TO REMOVE SEDIMENT. T.B.R. T.B.R. (0.40'E & 0.03'N) 14. ESC REQUIREMENT - REMOVAL OF TEMPORARY BYPS. ALL TEMPORARY EROSION AND SEDIMENT -CONTIM Me U N P L A T T E D aEUAWVG11tWRM�N0 LUMMITS SHALL BE REMOVED WTHIN 30 DAYS AFTER FINAL SITE STABIUZA77ON IS ACHIEVED OR AFTER THE TEMPOR I AR t BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED OR STABILIZED ON S17E DISAIRSED SOILp)EAS RESUL77NO FROM REMOVAL SHALL BE PERMANENTLY STABILIZED. 15 EROSION AND SEDIMENT CONTROL REQUIREMENT - DEWATERING C0NS7RUC770N SITES DEWATERING SYST&S DISCHARGE INTO A SEDIMOVT IRAP OR SEDIMENT POND. t5 OL�FIAM161 55'u 16. EROSION AND SEDIMENT CONTROL REQUIREMENT - CONIROL OF POLLUTANTS OTHER THAN SEDIMENT ON RLTER C C0NS7RUC710N MIES ALL POLLUTANTS 07HER INAN SEDIMENT MAT OCCUR ON 97E DURING CONSIRUC710N SHALL POO- 61R*pjAj&1 7M ?OZA p 'y SECU ED TO 2" X 2" FILTER FABRIC MATERIAL IN BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINA77ON OF SIORM WATER. CS 14 . WIRE FABRIC CONTINOUS ROLLS. USE STAPLES 1Z EROSION AND SEDIMENT CONTROL REQUIREMENT - FINAN04AL LIABILITY. PERFORMANCE BONDINa OR OTHER 00� E L OR WIRE RINGS TO ATTACH APPROPRIATE FINANCIAL INSTRUMENM SHALL BE REQUIRED FOR ALL PROJECTS TO ENSURE COMPLIANCE Wrn-77HE 5RTV-1/tJ61,4fJt> 0VLi-j-t11C-,1 VIL FABRIC TO WIRE. APPROVED EROSYON AND SEDIMENT CONTROL PLAN. [ORD. 3013 0 1, 19951 C ol W04C-K- 04LY. AN V WM9- j9a[C, 2" X * WOOD CIS R=10' EQ L ENT 2, 0U7-5(PC IrUe:�'Co,00 or- T'�MS WIRE MESH SUPPORT Fi 0r::;'b Af TA CHODADT Vill TrO CADC If � CASPERS STREET z C3 z w z (0 ry BELL SIrr ju MAIN STREET w DAYTON STREET w cf) V) WALNUT STREET In w w z V) z V) PINE STREET VICINITY MAP N.TS. LEGAL DESCRIP77ON PARCEL A: qmwq j5i.42 FrEr VEST AND 55 FEET NORTH OF THE SOUTHEAST CORNER OF THE SOUTHEAST WARM? OF THE SOUTHEAST QUARTER OF SECIION 23, TOIWSHIP 27 NORTR, RANGE 3 EAST, WM., 7HENCE NORTH 55 MT, THENCE KST 7o Furr To THE iRuE POINT or BEGINNING, THENCE REST 60 FEET, 7HIENCE SOUIH 55 FEET, THENCE EAST 60 FEET, THENCE NORTH 55 FEET TO IHE MUE POINT OF BEGINNING, (ALSO KNOW AS KEST 60 FEET OF L07S I AND Z BLOCK 4, OLYMPIC VIEW ACCORDING TO THE UNRECORDED PLAT 7HEYEOF) MIUATE IN 7HE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. APN. 27032300414400 PARCEL a - ALL THAT POR71ON OF THE SOU7HEAST QUARTER OF SE077ON 23; TONNSHIP 27 Ni RANGE 3 EAST, WM., DESCRIBED AS FOLLOW BEGINNING AT A POINT J41.42 FrET KEST OF THE SOUTHEAST CORNER OF SAID SEC770N; 7HENCE NEST 130 FEET, 7HENCE NORTH 55 FEET, THENCE EAST 130 FEET; THENCE SOUIH 55 FEET TO THE POINT OF BEGINNING, (ALSO KNOIW AS LOIS J AND 4 BLOCK 4 OLYMPIC VIEW, ACCORDING 70 THE UNRECORDED PLAT THEREOF). APN.- 27032300413600 PARCEL C, BEGINNING AT A POINT 341.42 FEET KEST AND 55 FEET NORTH OF THE SOUTHEAST CORNER OF THE SOUTHEAST QUARTER OF SEC77ON 24 TOONSHIP 27 NORIH, RANGE 3 EAST, WM.; THENCE NOR7H 55 FEET, 7HENCE WEST 70 FEET, THENCE SOUTH 55 FEET; THENCE EAST 70 FEET TO THE 7RUE POINT OF BEGINNING; (ALSO KNO1W AS THE EAST 70 FEET OF LOIS I AND 2, BLOCK 4, OLMPIC WEW, ACCORDING TO THE UNRECORDED PLAT 7HENEOF). APN. 27052300414900 -0 CITY INSPECTION REQUIRED ON ALL ERDS113N CONTROL GRATE P-1 I I MEASURES BEFORE WORK CAN BEGIN, 6N NIN, I)IN770ft-49' 0016-PIA10 8'- 12" CONSMUCTION SEQUIENM 1>1 1� 1. CALL ENGINEERING INSPEC71ON LINE (425-771-0220, EXT 1326) TO SET UP A PRE-CONSTRUC77ON 1A1VCe'_S7`1Cv�0A1 FgU5 CB MEE77NG WTH OWNER, CONTRACTOR, DESIGN ENGINEER AND CITY ENGINEER. 2. TEMPORARY EROSION CONTROL MEASURES TO BE IN PLACE AND INSPECTED PRIOR TO ANY -6" BURY BOTTOM OF FILTER CONSTRUCTION OR S17F CLEARING. 110, 61VI 090, 967 818 MATERIAL 8" TO 12" 3. REWEW EROSION & SEDIMENTA71ON CON7ROL NOTES. 4/4, 6' MAX. 4. CONTRACTOR IS TO PROVIDE DUST CON7ROL MEASURES AS REQUIRED INCLUDING STREET SWEPING. PL CE 3/4--1.5' WASHED GRAVEL IN 5. ROUGH GRADE, INSTALL U77LI77ES & STORM SYSTEM PER PLANS. E TRENCH AND ON BOTH SIDES OF 6. DESIGN ENGINEER- SHALL INSPECT KEY PROJECT ASPECTS DURING CONS7RUC770N. 0 0-� ILTER FABRIC FENCE ON THE SURFACE. Z FINAL GRAD& PLACE AND HYDROSEED PER N07ES & DETAILS. 2" X 2" WOOD POSTS OR EQUIVALENT REMOVE TE.S.C, FACIL177ES PER CITY APPROVAL AND ONCE EXPOSED SOILS ARE PERMANENTLY STABILIZED. FILTER SOCK WITH Aor_ sutipil4e, caj!�rpuc-noW 13VER FL13W H13LES CO CTOR/DEVELOPER SHALL MAINTAIN AND REPLACE TEMPORARY GRAVEL RAW BALES TO INSURE PROPER EROSION CONTROL. ERMON & SMIME-VTAllON =TR-QL NOMS: 4. CONSTRUCTION ENTRANCE 1 1. DURING CONSTRUCTON, STRAW OR OTHER MATERIAL To COVER EXPOSED EAR7H SHALL BE ON LOCAPON N. T. S. AND READY TO USE. F THE NEXT WEATHER DAY FORECAST IS RAIN, THE SITE SHALL BE COVERED AT 774E CITY INSPECTION REQUIRED ON ALL CATCH BASIN END OF THE DAY. THE S17E SHALL BE COVERED IF THE NEXT DAY IS A NON -WORKING DAY EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN, 2. SOIL STOCKPILES ARE TO BE COVERED M7H VISQUEEN WITHIN 24 HOURS. 3. IMMEDIATELY FOLLOWING FINISH GRADING, FINAL LANDSCAPING IS TO BE INSTALLED OR HYDROSEED OR MULCH AREAS OF EXPOSED EAR774. 8" MIN. LOW PERMEABLE KEYS F; D M` . . . ........ �IW EDMONDS TONE CAP UNIT OF geup-p OF KE TONE COMPA C UNIT REVISION5 BUILDINIG?DEPARETMEf), W=110M N07F., STANDARD DETAIL e"']" ET. _wffj Ali BY DATE WORK J t1jjj/) CALL THE CITY ENGINEER INSPEC71ON UNE (425-771-0220, EXT 1326) 24 HOURS IN ADVANCE ex4+V,477o&1) 4�"P/A[4* ANP 1" - 1 114" A004RE, FOR ALL ENGINEERING INSPEC77ONS. Ej FILTER FABRIC FENCE FILTRATION SYSTEMS R STRAW BALES MAY BE USED IN Ow, FINISHED GRADE DATE N Ula CERTAIN CIRCUMSTANCES (SEE APPROVED BY PLANNING UNIT DRAINAGE F7LL ,&go- 9910 7/24/ NTS E1.1 DETAIL E1.11), THIS APPLICAITOK TIMES DURING CONSTRUCIT13N BLDG OFFICIAL ROCK OR STONE) 4�Ij _ET FILE (314* CRUSHED _" M 1. : III APPROVED DATE SHALL BE MAINTAINED AT ALL ie r, Era ... ... au k I-T-L 5-- PERIOD. STRE _T[ TT APPROXIMATE LIMITS _j 0 OF EXCA VA 77ON V INF`ORCED CONCRETE OR A4,OAI I n P-( N 61 PERMIT UMSF-H SHEET ld=- 4" PERFORA7FD PVC CRUSHED STONE LEVELING PAD TEMPORARY FILTER 2 _oqa� SHEE T I OF 4 CLEARING, TESC. & GRADIN PLAN 132- -...A S*W.F,-T e's- SHEET 2 OF 4 ROAD, DRAINAGE, SEWER & WATER REDS UB* DRAINAGE TfLE WRAPPED IN FABRIC FENCING -Ti _sii etrr ----___,5HEET 3 OF 4 DETAILS & NOTES FILTER FABRIC XIIOWA16 W/2 SHEET 4 OF 4 MAMC CONMOL PLAN NOV 10 2008 13L�LUN �R M .WPA N MODULAR BLOCK ("KEYSTONE) WALL .,Pwa rmAg nnionaine nmftent ilz, 0A&_,V 'ON'& I M N. TS. V - 1 M-11ty %NA 1-4--\ Ir-Ml-UMAMT Z-)r_L)`1Mt1V I IMAf- rUK (,LTZ) BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION aN SURVEYED BY. LOVELL-SAUERLAND & ASSOCIATES, INC. DATUM- CITY OF EDMONDS SEWER SYSTEM BA SIS OF CENTERLINE OF WALNUT STREET PER BOUNDARY LINE ADJUSTMENT RECORDED BEARING., UNDER A.F.N. 199911015001 BENCHMARK: "R" IN MUELLER ON FIRE HYDRANT LOCATED AT THE INTERSECTION OF WALNUT STREET AND 3RD AVENUE S.ON THE NORTHEAST CORNER. ELEVA71ON = 50.72 SURVEYOR NOTE. THE LOCATION OF UNDERGROUND U77LI77ES SHOWN HEREON ARE APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL U77L/7IES Iff 7HE 10 a 10 20 30 AREA TO DETERMINE THE LOCA77ON AND DEPTH OF ALL UTILITIES ON AND i@ ADJACENT TO THE PROPERTY Scale 1" 20' NOT TO SCALE Edmonds STD E1.3 AP GAMOM QUAN77 CUT, Z790 CY FILL: 12 CY GRADING QUAN7771ES ARE ROUGH CALCULATIONS THAT DO NOT TAKE INTO ACCOUNT SHRINKAGE OR SWEUAGE. S17F ADDRESS 316 WALNUT STREET C'n r1kin IAJA nOnf)n REV. I DESCR[PTION DA TE >z I Revise per City review comments of March 12, 2008, Revise alley grading, Raise FF 61. 5-2-08 PREPARED BY.- CLEARING, TE.S.C., & GRADING PLAN 2. Update to match revisions on other sheets per review city review comments of 8- 14-08. 10-JO-08 "71 L I (17 DONNA L. BRESKE., P.E. r uR V, v 4 6621 FOSTER SLOUGH RD. 5 SNOHOMISH, WA 98290 WALNUT STREET CONDO S U=7 CONFUCT NOTE: TAX IDS: 2703000414400 270=00413800 Iz I N - IST PHONE:. (425) 334-9980 27032300414900 PFN. THE CONIRACTOR SHALL BE RESPONSIBLE FOR VERIF)ING THE LOC4710N, DIMENSION AND DEPTH OF ALL EAIS77NO U77UIIES AHETHER T/ONAL SHOW ON THESE PLANS OR NOT, BY P07HOLING IHE U77UIIES AND SURVEYING THE HORIZONTAL AND WR77CAL LOCA77ONS PRIOR TO DEVELOPER. Michel Construcdon, Inc., 7907 212th ST SW 1102, Edmonds, WA, 98026, (425) 776-2211 CONSIRUC7701V. THIS SHALL INCLUDE CALLING U77UTY LOCA IF AT 1-800-424-5555 AND THEN POTHOLING ALL OF THE EAIS71NO FAX: (425) 334-7380 UTILITIES AT THEIR LOCA71ONS OF NEW UTILITY CROSSWGS 70 PHYSICALLY VERIFY ;WE7HER OR NOT CONFLICTS EXIST LOCA77ON OF EXPIRES: 11/0 /09-] SC".. I �__ 20, ISSUE DA7W.- 1-16-08 SET NO. I OF 4 SAID UTILITIES AS SHOW ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIA770N. I I I I IN SE114, SE114., SECTION 23., T.27 N.2 R.3 E05 W.M. DEIFNII0N VOLUME REQUIRED. 394.66 OF DE7EN710N VOLUME PROVIDED. 402.72 CF VA RAMP 0 000S SID E2.15 EX SS�Ij TOP 56.39 NV. 42.16(fN N) NV. 42.1 6(OUT VO _�' �'_7_,ZZ C4 c� EX. CB SAKUT UNE X FROM EX. C13 P 55.51 TOP 63.47 NV. 53 86(8-E) PROPOSED FACE OF NV. 60.90(12-S) NV. 53'78(12-S) (f_4 CURB TO ALLOW MR :NV. 60.84(8-E) INV. 53.51 (8-W) MINIMUM 2'ASPHALT INV. 60.80(8-W) PA MH BACK. HEAT & TACK SEAL- IVIH- WALNUT STREET A SPHA L T SEA LER :w� ;:�� --- z so ,-so ;P SIDEWALK WRII 7 It Q:: CA PEI? SID Ez. I -C\L 9 2.8 (b 00 "ca 3' DIA CMP-160A 12S� ENDS DCJXA 96§;T�_ / �_p \-:I/ 2 % x Y2 IN. 770N'ALUMINIZED 1pA;9;FwLT v 2' RGV 2 ' WDE SIFEL OR ASPHA T TREATED. EZA E78.1, & E7.20 2" RG ASPHALT INDENING EX. 3" BRASS PLATE ss- ss N 89*44'34" E VAULT DIMENSONS- 1O'x5*-6'_' % L PAINT CURB 160.00' 7E I NEW 3 HR L I REA(OVE EX15qING INCOMING PAINT CURB % TYPE I-L C8 G SION gs wuOw1 5 FT. UPGRADE � CURB RAMP TYPE 4 PIPE FROM 7HE S0U7H. EX. CO MIOW, 5 FT. I tu mumne 07h rg 17 w1A TED UD TO 56. 3 6 % MP=6aO C4 RE-LOC4 7E .3 HR INV. 54-.10(12-N) 0 -4- L4 rap f-) '- 6 vc r PARKING SIGN Mtw)-55.0 ( ) \ � _* REPLACE DROP CURB & T, GUT7ER FOR WDTH OF NEW f A '4 EX. CB ,65- 55� 5r Al .4 TOP 64.70 ASPHALT ALLEY APPROACH 55-65 -j1ARKk 5r (V INV. 61.82(12-SW) I Mu' f 03N No "_IW 0,L 0.0 F 6 P/v t ip_mC_EELE_CB0_XL1D _W1 7R-AFRC- Ot4 E .0 14v - - - v 30, 3Q' EX. CB LOADING& ADJUST FLUSH 70 ASPHALT 11 70 vx LE STOP" IE-51 70 TOP 64.03 4 0. A 4" FIRE SIGN INV. 61.7jk12"N) Pvc LINE 0 INV. 61.53(6-E) "'%1wfG'OT z _., f 40 3 IL 0 J 4" p WATER 8 8 ff]VAULT pr r- L (n 01, '/oo BEGIN 18' cf) m EX. CB IE=58.1 a 7rE I-L CS u TOP 64.11 R%OED EDGE J WIURAW, LID -S) GA ______FINV. 61.87(8 � r PROP. CONC. m C3 TOP=59.9 1E(N&E)-55. 0 �­PAD FOR USPS RCE_ c§,4 TYPE 14-� CBU MAILBOXES z cu EAIS77NG SS TO WAOUD LID (f) . 'I / BE USED FOR PPUMP 8AS_q1N m 2 17�4" PVC 0 41- 0 �sw I - NEW BUILDING P 0 co 7 1AE 0 0ox IE(S) =50. 72- .61 0 7 GARAGE 40 VC 0 1 q CC) Z GARAGE Pvc PERF I, 61"CO "w/1 r 0 _q T110 , I ' I CA J am a-wo A. rn PIPE CONNECT TO YARD BASIN AT GARAGE 70.00' S 89*44'14 'cz INSTALL CLEAN OUT AT T3 0. 66 m 0 4" DROP 7H END OF CITY MAIN, 6--_`?R1WCH DRAIN YB 4 REPLA( 3 Z6 SSCOI CURB I AAISED CA EXIS77NG SS MP=51.75 I , 1, 1 i� AX& 6 SIDEW SIDE SEAER IE-50.75 ca WRI70 L CURB 1. ASPHALT �,-4" PVC PERF PIPE MAXW EXIST GUTIV? CONNECT TO TRENCH DRAIN PEI? A40NDS C.14 L STA DET41i M E2. 8 0 -FY--CJ3 TOP 56: 53 STREET 7RE�S PER iNV. 5 33(3-S) 3 LANDSCAPE"OLAN (TW.) TOP 64.60 NV. 55 23(6-E) INV. 61.74(8-E) NV. 54'97(8-N) N HARCEL B 4 INV. 61.45(4-S) I IR, -N) INV. 59.62(8 5 REMOVE C8 & PIPE�- ZZ) L - - - -- - - - - - - - :mp"NA-L� -E) TO THE NORN 15' B" L 0 - YB INV. 58.85(12 SECTION LINE 84-4* PVC 0 110% EX. TACK IN LEAD PLUG IN (D I zo --- 01 2" IRON PIPE IN CASING REFUsgr, 4NcyaE 0i --------------- 30.001 30.0 (SECTION CORNER) 24 ENa W 130. r 23 7� ob­ 00' 18.62' 338.62' N 89'44'14" E N 89*44'14" E FOUND EX. IRON PIN Z:j CLEANOUT 351.36' 2 '25 Z� to ", 351.42'(LD) WITH PLASTIC CAP (Typ) EXTRUD CURB FOUND EX. IRON PIN NO'D LSA#17970 YARD BA FO D E IRON IN NTH PLASTIC CAP (0.55'E & 0.10-N) WITH PLASTIC CAP NO'D LSA#17970 NO'D LSA#22969 4' P VC PERF PIPE (040'E & 0.03'N) F007ING INFIU-- CONNECT 70 YARD BASIN U N P L A T T E D IRENCH NO- 5-1/2" 1" R 18 1" BATTER 4 . 1 "R CITY INSPECTION REQUIRED ONI FORM WORK PRIOR TO POUR 0 FT/FT .05 NOTE: IF A THICKENED EDGE IS ADDED TO EMS77NO PA WMEN T 4w A PAVEMENT OR APPLIED AFTER NEW PAVEMENT IS PLACED, IHICKNESS 4 7HE ASPHALT SURFACE SHALL BE 7HOROUGHLY TACKED. A 6" q A .4 A. A. 4" 4 A,*Dt-I`1AL I t:Utit 1006� N.TS STD. E2. 11 - � �- ASPHALT VALLEY GUTTER ALLEY rot a DRIVEWAY �_24_� ASPHALT GUTTER NOT TO SCALE 18" STANDARD 24" ARTERIAL = 5/8" MINUS CSTC NOTES: 1. FORMS SHALL BE TRUE TO LINE AND GRADE AND SECURELY STAKED. 2. THRU JOINTS SHALL BE PLACED ADJACENT TO CATCH BASINS. 3. EXPANSION JOINTS SHALL BE EVERY 10 FEET AND DUMMY JOINTS EVERY 5 FEET. 4. THRU JOINTS SHALL HAVE 1/2" TO 5/8" WIDE PREMOLDED JOINT FILLER. 5. CONCRETE SHALL BE CLASS 3- 300OPSI. 6. FINISH SHALL BE LIGHT BROOM. 7. CURB SHAH BE SPRAYED WITH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS. 8. ALL SIDEWALKS POURED BEHIND CURB IN DRIVEWAY AREAS SHALL 13E 6" THICK OVER 2" OF CSTC NTH SUBGRADE COMPACTED TO 957c MAXIMUM DENSITY. S TA NDA RD TYPE of A 0.0 CURBIGUTER DETAIL 107" N. T. S. PER EDMONDS STD. 2.8 BOUNDARY AND TOPOGRAPHIC SURVEY INFORMA77ON SURVEYED BY. LOVELL-SAUERLAND & ASSOCIATES, INC. DA TUM.' CITY OF EDMONDS SEWER SYSTEM BASIS OF CENTERLINE OF WALNUT STREET PER BOUNDARY LINE ADJUSTMENT RECORDED BEARING: UNDER A.F.N. 199911015001 BENCHMARK: "R" IN MUELLER ON FIRE HYDRANT LOCATED AT THE INTERSECTION OF WALNUT STREET AND 3RD AVENUE S.ON THE NORTHEAST CORNER. ELEVA77ON = 50.72 SURVEYOR NOTE, THE LOCA77ON OF UNDERGROUND U77LITIES SHOWN HEREON ARE APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL U77LI77ES IN THE AREA TO DETERMINE 7HE LOCA77ON AND DEPTH OF ALL UTIL177ES ON AND ADJACENT TO THE PROPERTY. FH L (A C� MIN. TYPE 1-L C8 S7RAP " Pvc OUTLET IE=55.0 . 4,0 9" MIN. 4 RIU=59.9 SEWER CONNEC77ON NOTE. - THE EXIS77NO SEKER LA7FIAL SHALL BE TVd BY IHE CITY PUBLIC KVRKS DEPAR7UENT 70 DEMMINE F THE LA7ERIAL CAN BE REUSED. F THE LA7ERAIL CANNOT BE REUSED, IT SHALL BE REPLACED BY 771E CON7RACTUR FROM THE MAIN 70 THE PROPERTY LINE. F THE M77NO SANITARY SIDE SERW IS PROPOSED TO BE REUSM 7HE SIDE MO SHALL BE TVd BY THE CONTRACTOR11PROPERTY OMER AND A COPY OF THE WDEO PROWDED TO THE PUBLIC WORKS DEPARIMENT FOR APPROVAL TO REUSE ME LIEN. CHECK VALVE BALL VALVE IN VALVE BOX jjq' MIA/ GROUND ELEVAIION-510 QUICK RELEASE UNION 70 NEMA 4X PANEL! CHAIN OR POLY ROPE PER MANUFACTURER'S RECOMMENDA7701VS P -11, Pvc SCH 40 CONDUIT FOR POMR 4' PVC -IN 2" SCH 40 PVC r IE-51.7+1- ON I)nj '0_� MERCURY ON/OFF IE=50. 72 FLOAT SKITCH ON a-5127 OFFa-417 BOTIOMM OF C9=46.7 4- SUMP PUMP C812-PUMP BASIN GOULDS 1/3 HP TYPE I-L CS 3887BHF OR EQUIVALENT -TRENCH DRAIN PUMP DETAIL N. TS. 0WRFLOW EL=58.0 ELBOW IE=56.6 ORIFICE DIA.=1.65 6" PVC 6" x 6' x 6' PVC 7EE RESTRICTOR DEVICE - CB-1 N. T. S. 10" 6" MIN. on 5" 2 1/210 -.002 1/2" NOTE. 9- EX7RUDED CURB SHALL BE LOCA7ED ON PRIVAT PROPERTY NOTES: 1. EXIRUDED CEMENT CONCRETE CURB SHALL BE BONDED TO THE PAWMENT WIN TACK COAT OR SLURRY MIX7URE ADHESIVE. I LONTS IN EX7RUDED CEMENT CONCREIE CURB 94ALL BE cur wRi7cAaY AT 10 FOOT IN7ERVALS TO A MINIMUM DEPTH OF 5 INCHES. SAIIIED CUTS SHALL BE 1/8 INCH MINIMUM WD7H. EXTRUDED CURB DETAIL /009 ORInCE EL=54.85 +/_ P VC INSIDE DIA ME IER CA P 5R-ILL o 75" oRIncE IN CEN7ER OF CAP. SECURE KITH ADHESIVE & 4 STAINLESS SIEEL SCREWS. N.TS. S 7D E2. 7 INSTALL 2" DIA PIPE IN ORDER TO PREVENT UPS7REAM AIR LOCK ce #1 C8 #2 DETENTION PIPE UPSTREAM AIR LOCK DETAIL NOTES 1. CATCHSASINS TO BE CONSIRUCTED IN ACCORDANCE WMI ASTM C 478 (AASHTO M 199) & AS7M C 890 UNLESS OTHERWISE SHOWN ON PLANS OR NOTED IN THE WSDOT / APWA SPECIRCA77ONS Z REINFORCING SHALL BE EQUIVALENT TO WELDED WIRE FABRIC HAVING A MINIMUM AREA OF 0. 12 SQUARE INCHES PER FOOT WELDED WIRE FABRIC SHALL COMPLY TO ASIM A 497 fAASHTO M221). MRE FABRIC SHALL NOT BE PLACED IN THE KNOCKOUTS. 3. THE BOTTOM OF THE PRECAST BASE SECTION MAY BE ROUNDED. FRAME AND GRATE GRATE IN ROW SHALL BE LOCKING, VANED GRATE. 2'X4'X8" SOLID BRICK USED FOR FINAL ADJUSTMENT TO GRADE. 6" HIGH AIAX. 4. PRECAST BASES SHALL BE FURNISHED WITH CUTOUTS OR KNOCKOUTS. KNOCKOU73 SHALL HAVE A WALL THICKNESS OF 2' MINIMUM. 6' OR 12' CONCRETE RISER 5. KNOCKOUTS MAY BE ON ALL 4 SIDES WITH SEC17ON CLASS 4000 KNOCKOUTS MAY BE CONCRETE MAXIMUM DIAMETER OF 28". EITHER ROUND OR "D" SHAPED, PIPE TO BE INSrALLED IN FACTORY SUPPLIED KNOCKOUTS. 0 6. KNOCKOUT OR CUTOUT HOLE SIZE IS EQUAL 70 PIPE OUTER D14METER PLUS CONCRETE (0 INLET WALL THICKNESS. Z THE TAPER ON THE SIDES OF THE 6" CONCRETE REDUCING TOP SLAB CLASS 4000 PRECAST BASE SEC77ON AND RISER SEC71ON CONCRETE SMU NOT EXCEED 112" PER FT. 8. CONCRETE INLET FRAME AND GR47E` SHALL BE (0 IN ACCORDANCE W17H THE WSDOT / APWA SPECIRCA77ONS AND MEET THE STRENGTH REQUIREMENTS OF FEDERAL SPECIFICATION RR-F-621D. MA77NG SURFACES SH4U BE FINISHED PRECAST RASE SEC77ON TO ASSURE NON -ROCKING RT. (MEASUREMENT AT THE TOP OF THE BASE) 9. FRAME AND GRATE MAY BE INSTALLED WITH FLANGE DOWN OR CAST INTO RISER. 00 z 0 a ... I—— 10, O.C. IN 5' O.C. PLA #21 mid. 5' TO 7' z ;AwWr 2X 4- 1' A EARTH OR FULL DEPTH 1/2" COMPACTED NATIVE MATERIAL EXPANSION UNLESS OTHERWISE SPECIFIED JOINT MATERIAL BY ENGINEER SEC TZ ON CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR NOTES: 1. CONCRETE SHALL BE CLASS 3- 300OPSI 2. CONCRETE SHALL BE BROOM FINISHED 3. SIDEWALK THICKNESS SHALL 13E 5-1/2". 4. SIDEWALK THICKNESS AT DRIVEWAYS SHALL BE 6" THICK. 5. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK. 6. CONCRETE SHALL BE SPRAYED NTH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS 7. SAW CUT AND REMOVE ACIP PAVEMENT A MIN. OF 2' FROM GUTTER FACE M INSURE ADEQUATE COMPACTION OF ACP AND GUTTER SUBGRADE. CONCRETE SIDEWALK DETAIL N.TS. EDMONDS STD. E2.13 CATCH BASIN TYPE 1-L DETAIL N.TS. kl__ OR CASTIRON GRATE 0 IM I 4' IN It 70 I(r N-12 OR RCP SPE - -AF LI NOTE-. CORE -DRILL HOLES IV TO 6" PVC PIPE FOR YARD BASINS GROtJT PIPE TO BASIN VATH MULTIPLE CONNECTIONS 41A 6' CONCRETE BASE YARD BASIN DETAIL 3 N. T. S. \411.- YARD BASIN SCHEDULE NUMBER RIM INVERT YB- 1 60.00' 55.73' Y8-2 60.00' 56.23' YB-3 60.00' 56.40' Y8-4 60.00' 56.68' Y8-5 60.0 5ZO6' YB-6 59.90' 5Z90' PPROVED FOR CONSTRUC71ON ml%�ml a I thb /Wv. fTY ENGINEERIA16 DivisleAl DA TE SM ADDRESS 316 WALNUT STREET EDMONDS, WA. 98020 IN SE114., SE114., SECTION 23., T.27 N.2 R.3 E., W.M. 1/2' LNOMINAL DIMENSIONS TAAZ 1-1/,40 1/4" A TRACTION GRID PATTERN TACTILE WARNING TEXTURING DETAIL A MIN. MAX. A 1 5/8" 2 3/8' B 5/8" 1 1/2" C 7/16" 3/4" L D 7/8" 1 7/16' 0 .2. UL0L,,1Tr_tr Qf7f" Dr. OrnAlCM Win A Wativii %ovmrvwtvu wn xTm" or. wyrnrw movu nIII mwor rL/fx fdC "VWIA%?, 4. DETECTABLE WARNING PATTERNS (TRUNCA TED DOMES) SHALL BE REQUIRED ON ALL PUBLIC STREETS AND PRIVATE siREErs sERwNG nvE OR MORE LOIS. TRAC71ON GRID (DIAMONDS) 70 BE USED AS INDICAMD. 5. DETECTABLE WARNING PATTERNS SHALL BE II I IN CaOR, SET AND SECURED IN CONCRETE, AND SHALL, MET THE DIMENSIONS AND SPACING giOw. 6. TAC71LE WARNING TEX7URING SHALL BE DONE NTH AN EXPANDING METAL GRATE PLACED AND REMOM FROM YET CONCRETE 70 LEAVE A DIAMOND PATTERN AS SHOW. THE LONG AAIS OF THE DIAMOND PATTERN SHALL BE PERPEND10LAR 70 THE CURB. GROOVES SHALL BE 1/80 DEEP AND 114' WIDE ADA RAMP NOTES TYPE 2 & 5 !A -0 SAW CUT AS REQUIRED 1'-0" TAC11LE STRIP 6" CONC. CURBING SHALL EXTEND TO THE LIMITS OF THE SIDE SLOPE AND SHALL MATCH THE TOP OF THE SIDEWALK SEE DETAIL B T U C T RUNCATED DOMEVS) 1/2" EXPANSION JOINT SAW CUT OR REMOVE TO NEAREST JOINT ADA RAMP DETAIL (TYPE 5) N. T. S. Edmonds SM's E2.17 6.0 5.0' (TYP) N 6 4WD OR' %018 A A( MAIN RAMP- 2X S SIDEWALK THICKNESS SHALL B E 5.5'v REMOVE AND REPLACE CURB AND GUTTER B-1 11�1 DETECTABLE WARNING PATTERN (TRUNCATED DOMES) SEE RAMP DETAIL B DWG# E2.22/ 00. REMOVE AND REPLACE CURB AND GUTTER WARNING PATTERNS ;��(TRUNCATED DOMES) V WIDE TACTILE STRIP (TYP) e-ALL LOCA71ONS VARIES RAMP $HALL BE FLUSH AT THE GUTTO LINE 2X SLOPE CONCRETE CURB AND GUTTER 95% COMPACTED SUBGRADE. ADD SEE DETAIL E-18 (NEW CONSTRUCTION ONLY) CRUSHED ROCK BASE AS REQUIRED 11r FULL DEPTH EXPANSION JOINT MATMAL SECTION B-1 CURB AT 1:12 6050;0 000000 f% f% R I 1 L-L L I L1 Ll w w w 00000 00000 0 0 00000 0 0 0 0 0 0 0 0 KAMP AT 1: 12 -1 0000 00 .0..0 0000 0 0 000 000000 0 01 0 NO INSTALL 1/2" EXPANSION JOINT MATERIAL (TYPICAL) EXIS71NG SIDEWALK SAW CUT AS REQUIRED LTIkCTIUE MING STRIP CURB RAMP--' I' Tw, a- I WIDE CAL) 2.5' LONG 31 LANDING REFER TO DETAIL TYPICAL ON E222 FOR SPACING ALL RAMPS AND SPECIFICAITONS 6.0' MINIMUM CURB LENGTH RAMP SMALL BE FLUSH 3' LANDING VARIES SIDE CURB SHALL BE AT A 1:12 SLOPE WITH GUTTER LINE [_�IAD THE DISTANCE OF THE RAMP `1: 12 MAX SLID —I CONCRETE CURB AND GUTTER 95X COMPACTED SUBGRADE. SEE DETAIL E-2.8 2' ADD CRUSHED ROCK BASE AS REQUIRED (NEW CONSTRU07ION ONLY) go. 11Z FULL DEPTH EXPANSION JOINT MATERIAL ZDETECTABLE WARNING PATTERN SECTION B-1 (TRUNCATED DOMES) ADA RAMP DETAIL (TYPE 2) N. T. S. Edmonds STD E2.15 5# 10" 0.62`1 THICKENED EDGE 0.62 EXIS77NG -2% ALLEY 18.62 18' WArAK A ROW rt 10" ALLEY PAVEMENT SECTION of A —A## rA N. T. S. 2 ALLEY 18.62' 18' 1-2% 10" 16 it 6 16 -�6 . . . . . . . 7�\ 2" AC PAVEMENT APPROVED SUBGRADE 2 ATB I$ 4 1-1/4" CSBC A L L E Y PA VEMEN T SEC T/ ON "B — B N. T. S. DRIVEWAY 24 10. . . . . . . . 0 2" AC PAVEMENT APPROVED SUBGRADE 2 AT13 4 1-1/4" CSBC DRIVEWAY SECTION $PC— C p) N. T S. .30' J-HR PARKING �2' MIN. SAWCUT NOTE. NEAT LINE CUT, CLEAN, NEAT &--/ Nl� TACK EDGES K17H SEALER CSS-1 AND SEAL MTH HOT ASPHALT CEMENT CUT SHALL BE AT LEAST 1.0' INSIDE EXIS77NG EDGE OF PAVEMENT. BACKFILL EXIST DITCH W/ GRAVEL BORROW WALNUT STREET FRONTAGE IMPROVEMENT N. T. S. 7.0# 2.5 SIDEWALK -2% VER77CAL CURB 2 3* COMP. DEPTH CLASS "I ASPHALT CONCRETE 3" COMP. DEPTH AT9 BIN MIN. COMP. DEPTH GRA VEL BASE LANDSCAPE WALL 3' HIGH MAX. %PPROVED FOR CONSTRUC77ON I 19 NTY ENGINEERIA05 D)V1510a DA TE REV. I DESCRIP77ON DATE U. PREPARED BY: 2 WA 3 DONNA L. BRESKE, P. E. 4 6621 FOSTER SLOUGH RD. 5 SNOHOMISH, WA 98290 IV= CONMCT NOTE: "I - IST PHONE: (425) 334-9980 7HE CONTRACTOR SHALL BE RESPONSIBLE FOR ffl?"NG THE LOC47701I DIMENSON AND DEPTH OF ALL EXIS77NG U77UTIES WETHER /ONAL OD SHOW ON THESE PLANS OR NOT, BY POTHOUNG THE U77U71ES AND SURVEWNG THE HORIZONTAL AND If R71CAL LOCA 17ONS PRIOR TMO CONSTRUCTION. THIS SHALL /NaUDE CALLING U77UTY LOCATE AT 1-800-424-5555 AND THEN P07HOIJNG ALL OF 7HE EXIS77NG F".- (425) 334-7380 U17LITIES AT THEIR LOCA77ONS OF NEW U71UTY CROSSIN;S TO PHMCALLY M?IFY IWETHER OR NOT CONI EXIST LOCA77ON OF EXPIRES: 11/05/09 SAID U71UTIES AS SHOIW ON THESE PLANS ARE BASED UPON THE UNVERIRED PUBLIC INFORMA7701V AND ARE SUMECT TO VARIA7101V. S17E ADDRESS 316 WALNUT STREET EDMONDS, WA. 98020 DETAILS & NOTES FOR NOV 10 2q WALNUT STREET CONDO'S eUL CWC, PA" OpT olAC TAX ID's: 27032300414400 27032300413800 27032300414900 PFN: DEVROPER. Michel Construction, Inc., 7907 212th Sr SW 1102, Edmondg, WA, 98026, (425) 776-2211 SCALE: 1�­- 20' 1 ISSUE DATE.' 4-2-08 1 SJIT NO. 3 OF 4 I mz 0 -n 2 BLOCK-1 3 BL005,-- ounmon ECOLOGYbLOCK5 SCALE: 1.00" = 20.00' E�D OF RING a I i"V NOTICE: DENNIS M. BRUCE, P.E. TO MONITOR INSTALLATION v:j,;o� OF SHORING vo plewfe- PIZOPO�hj AT ILU ILIA z z 15.50' 13.0 ID- HL FIN15H GKAPE 1:1 OLOPE la FINI5H GKAPE I oj� NN\ FOUNr>A'nON\ FOUNPATIONNN WALL WALL NN N (p .0 N 24'X24�'X72" 2,VX24'X72' ECOLOGY 13LOCK (TYP) ECOLOGY 13LOCK (TYP) DEN9E OTA13LE PENOE 5TA13LE qATIVE50IL NATIVE 5OIL I "No Fr\EE PKAINAGE 2.00' FKEE PKAINAGE 200 5ANPO & GKAVEL5 5ANP5 & GKAVEL5 N'll v IF - i,-ONNECTION TO N� d eeee I ""'>' N'N N % N % N N -, .1 o " CONNECTION TO % .. e .1 .1 N 5T0KM5Y5TEM 11 " % ... % '%NN %NN% % % N .1 eNeNeNe 0 e e "NON"N" % N N 5TOKM 5Y5TEM 'N 'N"N' ')OWN 5TKEAM OF % N%'.O % ro" EM13EDMENT e e 11 % POWN 5TKEAM OF KE9TKICTION A55EM13LY UNP15TURMI) 5011- Oil EML3EPMENT �IE5TKICTION A55EIV15LY IJNPI5TLlKI3EP 501L LEVEL L3A5E AAA.650-MC114- LEVEL 13A5E -LYA, A u EM v "o IL B'-1 1/4 = 1.00 APPROVED AS NOTED BY EN INEERING cm —04MM Date: —L'IyoN4� 740. cq (ON 0 cl Lo Lo 9 00 z CA 0 Lo Lo Lo C) d z l'--1 IN z Z C) c\I 0 00 cn z r) Z C) u u C) .4 7-8-08 REVISIONS: STABILIZATION I RESUB i4OV 10 2008 1 IN SE114., S.F114., SECTION 23, T.27 N.2 R.3 E., W.M. WHITE REFLECTIVE TAPE (TYP) EX. CD AN71CFAia aosm OF TOP 55.51 OF J-HWR PANIC AWA F� INV. 53.86(8-E) z z rn INV. 53.78(12-S) J DAM J6 HRS TOTAL 0 VFV INV. 53.51(8-W) INV. 53.49(8'NE) 3-- 00-z EX SS�H- Cq TOP 55.39 NV. 42.16(IN WALNUT STREET N)M 42.16(OUT I Z�Zz 1177 sdczz ze4 N w Vie EX SSMH MP) /fUP-443.25 ORA GE C4 00 'Ica NV. 38.65(IN E) 36.65(OUT W E) CONE "Id W 51 12' RGV 2' RGV 338.751 Ss- Ss- _SS 338.7 N 89*44'34-0 E t / UP AREA i T-OF-�W� Y ASSOCIA 7ED THE CON, i C", x CB (A Syr ITION OF,.�� SIDEWAL.K EX. CONCRETE MONUMENT TOP 56.33 7HE EXIS77NO WR77CA4 CURB. WITH 1 1/2" BRASS CAP INV. 54.10(12-N) INV. 54,08(8*S) I> 7;@> WITH "X" IN CASIN9% A- .001 T T T ROAD T -T - �;�6 'T1 I N E (3 -C -D MEW 6 E d- 21 A A PANK[No 55.65 A -0 JEL I) TV 0- (W20 5 SIGN N e I . - � 70.00' 60.00 (A 01 z 0 0 C5 CI1 5� N) N C% I C� �A 01 00 NO 01 EX. CB TOP 63.47 INV. 60.90(12-S) INV. 60.84(8-E) WV FH INV. 60.80(8-Vo WV L SD ROAD Nsmumm MEA W (W20-1) EX. 3" BRASS PLATE 30' 5' WOOD Ir ,,, / '. � I 1 100 %, FENCE c 4 0. loop r- OIL z OCAP 0 0* P- ol CC NC., m CONC WALL/ J '1 0- CONC. -PATIP C�' 0- 0 0/ w PARCE A 0 8 *MAPLE(DBL) ,6-11 1 5 EX. HO� ISE 13.6' m �2 rARAGE ski 5' WOOD /Z/// zzz/ 3' RAIL 4 fz�e' r- F, TT- 'N U L -7 ot ED 60.01 70 00' x - S 89'44-'l 4" _w\\ 13"0'.00' -m -tv 6 1 ONCE 3 '7 S L-5 FE 0 Y. BLDG - - - - - - 77 EX. CQ TOP 55.53 0 NV. 55.33(3-S) 11 C' NV. 55.23(6-E) RARCE B INV. 54.97(8*N) 4 7 SECTION LINE (D L _N,&2'PINE -��5 WOOD NCE 1 0.00, 0-!� HIGH M'40. WALL -18.62' '44-14- E EK. CB 3,38.62' B 77 b TOP 60 38 FOUND EX. IRON PIN ET046-0.45--/' d INV. 58'93(4-E) WITH PLASTIC CAP INV. 58.59(4"S%V) NO'D LSA#17970 NV. 58.51(4"VV) INV. 58.813(4-W) EX. CONCRETE MONUMENT INV. 57.71(18- E) INV. 5B.33(18-N) WITH 1 1/2" BRASS CAP (0.55'E & 0.10'N) INV. 57.62(18-N) INV. 58.46(18-W) WITH "X" IN CASING (NW COR. E1/2, NE1/4, NE1/4, U N P L A T T E D SEC. 26-27-3) Ikk/. "r- I LrA w CA SPERS STREET z w z z F- BELL MAIN STREET DAYTON STREET V) WALNUT STREET w (n w z w M w D z z z sIrpr w cn z in 0 PINE STREET HAUL ROUTE N.TS. Cn m C� 0 WV (-4 0 G G 0 OJID f-OftO "P.14. EX . CB (IS TOP 64.70 INV. 61.82(12-SW) 30, n EX. CB *STOP" TOP 4.03 SIGN INV. 61.73(12-N) INV. 61.53(6-E) WATER 8 [BVAULT EX. CB I INV. 61.87(8-S) z 0 �zw 4' (A 0 (0 7 C� 0 CC) 0 n V 00.0 1 / (0 6 E IA CH RY EX. C8 INV. 61.74(8"E) INV. 61.45(4"S) "111-2 INV. 59.62(8-N) 5 -06- INV* 58.85(12-E) G IN 13 EX. TACK IN LEAD PLU 2" IRON PIPE IN CASING 14*PI 30.00, 30.00' (SECTION CORNER) 23 24 r N E39*44'14" E 351.36' 25 26 Ei LID CURB 351.42'(LD) FOUND EX. IRON PIN FOUND EX -I ON IN TIC CAP WITH PLAS WITH PLASTIC CAP NO'D LSA#17970 NO'D LSA#22969 (0.40'E & 0.103-N) TRAFFIC CONTROL PLAN FRONTAGE IMPROVEMENT CONSTRUCTION z w BOUNDARY AND TOPOGRAPHIC SUPVEY INFORMATION z SURVEYED BY- LOVELL-SAUERLAND & ASSOCIATES, INC. DA TUM: CITY OF EDMONDS SEWER SYSTEM BASIS OF CENTERLINE OF WALNUT STREET PER BOUNDARY LINE ADJUSTMENT RECORDED BEARING; UNDER A.FN. 199911615001 BENCHMARK: `pR" IN MUELLER ON FIRE HYDRANT LOCATED AT THE INTERSECTION OF WALNUT STREET AND SRD AVENUE S.ON THE NORTHEAST CORNER. ELEVATION = 50.72 SURVEYOR NOTE.- THE LOCATION OF UNDERGROUND UTILITIES SHOWN HEREON ARE APPROXIMATE ONLY THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL U77LITIES IN THE AREA TO DETERMINE THE LOCATION AND DEPTH OF ALL U77LI71ES ON AND ADJACENT TO THE PROPERTY. REV. I DES0070N DA TE -�rl - I Per J-12-08 c* comments; Add Haul Route Map, Remove Detail for Seoer Une Install 5-2-08 L - 1�1 C' 2 Per B-14-08 city review comments. Revise Haul Route. Add J-Hr Parking Closure Note. 10-JO-08 i Revise Closure time III for Parkng along Walnut street 12-1-08 4 5 -27367 UTIL177 CONFUCT NOTE: GIs T THE CONTRACTOR SHALL BE RESPONSIBLE FOR VFR/F)7NG THE LOCA77ON, DIMENSION AND DEPIH 0 ' F ALL EVSTING U17LIlIES WETHER 6*/ONAL SHOW ON THESE PLANS OR NOT, SY POTHOUNG 7HE U77LI17ES AND SUR"NG THE HORIZONTAL AND III LOCA77ONS PRIOR 70 CONSTRUVION. 7HIS SHALL INCLUDE CALLING U77UTY LOCA TF AT 1-800-424-5555 AND THEN POTHOLJNG ALL OF 7HE EXIS77NG U71UTIES A T THVR LOCA 77ONS, OF NEW U77UTY CROSSNGS TO PHYSICALL Y WRIFY WIETHER OR NOT CONFLICTS 09ST LOCA 77ON OF EXPIRES: 11/05/09 SAID U77U77ES AS SHOW ON THESE PLANS ARE BASID UPON THE UNIVERVED PUBLIC INFORMA 77ON AND ARE SU8JECT TO VARIA 170N. PREPAMD B Y.- DONNA L. BRESKE, P.E. 6621 FOSTER SLOUGH RD. SNOHOMISHo WA 98290 PHONE: (425) 334-.9980 FAX.- (425) 334-7380 ?I PPROVED FOR CONS77?UCTION n eld mhhoas ,17Y ENGINEER10 PIVISMAJ DA TE S1 T ADDRESS 316 WALNUT STREET EDMONDS, WA. 98020 TRAFFIC CONT&I'VOL & HAUL ROUTE PLAN F F70R , U WALNUT STREET CONDO'S TAX ID's: 27032300414400 27032300413800. 2702300414900 PFM- DE*10PER., Michel Construction, Inc., 7907 212th ST SW 1102, Edmonds, WA, 98026, (425) 776-2211 SCALE.- I p!-- 201 ISSUE DATE: 1-16-08 SET NO. 4 OF 4 EX. 613 TOP 55.51 INV 53.&r5(6l'E) V V 53.76 (12"5) 1 53.51 (a" W) IN .53.49 (61 NE) EM NG TREE--) TO REMOVED EX15TI KOCKERY- TO 13F �Ca:,MOYED TYPE 1-L 55 W1 GRA-M LID TOP� *511,21) IE (N&E) 55,( Lu z NEW A5FH1ALT ALLEY 55 T.O.5. 6048, 6WOCID FENCE TO 13E EMOVED -F4 SCOM)c jr3arbagefrecycle collection orWandosure 1&77/ 019,54J AM) and location approved br. acjs;0 Pdf1T1m.(. i&*zo 0FA) 1R&qyc­r,n9-Fo�oreinator"Z4j1/& Date F f ( 10'00'OPKEAPER TRENCH . - 5D - - -!13D - - _50 - - - CID BENr ,H MAP, __EK CI3 :W 7 TOP 56.33 INV. 54.10 (1211N) INV. 54.05 (5" 5W) T13-K. TYPE I-L (010.11 ly/ ToP= (30.00, NEW51PEWALK IE (w) = 5E5,o �7 ........... 71 50 to SI""REET EXIOTING 5"OPKLICE TO'13E REMOVED --W :zLu 6" FINE 1- Lu �-EXIOTING TO 139 REMOVE 1) roz., INZ, IL z z to .-E3[) ___5D ___51) EX15JNG 6" CEP�R TO 13 REMOVED 59.00, yfo-boN RQOAA'-tA" E X Mb PKEVENI-EK 64 'OP:64,00 X14 'OE:62,00 z"'M u-10 '00. EMOTING EE5 Cq C) TO 5E REN VEP EX15TINGHOUOE MAX 21 n TO 5E KEIAOVE[) t-Z/ ! a KO 3KEKY X-4 b..f -ar Ijqm%Lw�= y ...... 0 .5 . r., 7K, T.0.6. 60.681 E3 Y A2. ................ .. ........... ... --- - --------- ........ ... 4 d . . . . P w Ira 0 a w TO 1:64.00' TO" .:62.00 31 HIGH CO�C. WALL TO 3E KqMOVEP C13 3 TYPE 1-L ......... 7.00 ---------- ------------- PORP BAF4 *�W EXIOTIJ 6": MAPLE IE(b�= 50,.72-1 TO 13F Rl_��VED 4 M N 3 O'X3 0' ANDING ro N, 5 OW� IN kE M X. 7" RIOE L 450 001 457,?�TVC Vt� Tyribb, w 3 IF 4, )VI 3.501 PIPE I"%, T- ­4 L 5"WOOP FENM*- X61,06 TO DE REMOVED +/- 3'HIGH CON 4. WALL & 3'KAIL FENCE :Pg VEWA E 5TI 0 DKI TO KEMOV51�_,_, ...... n loc. El N E HALT PRIVEW,�Yj PROPOSED 7 UNIT BUIL G 0ARA0E 6 LAB: DRIVEWAY FRON F ff .50 -------- x CENTER = 51.3( BACK 51.50' -154 13 -4) CONC. WALL - 0.70 XrO )-73 TO 13E REMOVED Xe: 0,89, J. E 13' .................. 32.5'1 �06, 17. -------- ------ ---------------- 10.00 1"k I ............................... 13 #5 13 #(5 4 1. N w w .. . I . I . . . . . . I - I - I - - - - - I - I - I . I . I . I - - - - I - I 7TING T EXIC TO VED 7AP XOO.510 '-_A;-0#'Z 130.00'N 8904411411 E '(0-ro roo EXI15TING 5(WOOP FENCE ALONG "".7 1 EXIOTING 10" CHERKY EX15TING 12" NNE C90UTH AND WE5T 61 PE PKOFEKT'� TOIP:64.50' TO DE KEMOVEP OF PARCEL 5. TO DE REMOVED. T015:62.50' TOP:66.25' TOIE:64.25' 70 30.00, .04 "MOVE EX TING 3'KAIL F: NCE TO PKOP.INE 7 36 .X15TING 14" FINE W W W W W A W, W 30.00, I 1'_HEIGHTCALC5 A ro 2. 73' 5 (34-22' C 65.521 P roo.7-51 /4 = 63.30 = AVE GRAPE MAX HEIGHT: 83.25' 13AOEMENT: 51.80' 15T FLOOR: 60.55' 2ND FLOOR: 70.96' 30 FLOOR: 51.04� ---- EX15TING GRADE -- PKOPO5EP GRADE M_IRKIU_Q__EEQQIKEME1NT_5 (1) 1 13ED 1.5X3 = 1.5 (1) 213ED 1.5X1 = 1.5 J:.�) 3 [3gP = 2X5 = 10 TOTAL REQ. = 14 SPOTS ACTUAL = 14 9POT!3 LOT COYgRAO-E: 6417,56/14,29ro.02 = 45%. LOT 5-LOPE: 7% E-W IMPE9VIOUS 13UILPING (+ EAYE5).-!6,975.05 5Q. fT, DKIVEW,AY- 575.02 5Q. FT. PATIO: 171.77 5Q. FT. TOTAL: 5,021.57 5Q, FT PTA: PARCEL A:2703-230-041-4400 PARCEL 13:2703-230-041-3500 PARCEL C: 2703-230-041-4900. swE -a-ENCH MARK: TOP OF EX16TING CATCH I3A51N ON THE NW PKOPEKY CORNER OF PARCEL A ELEVATION: 56.33' YELTICAL DATUM: "R' IN MUELLER 6N FIRE HYDRANT LOCATED AT THE INTERE)ECTION OF WALNUT 5T. & 3RD AVE5 ON THE NE CORNER. ELEVATION: 50.721 GKAQg PLANE AVE IRAGE PER 113C 502 A 61.95' B 64.36 C 66.05, D roO.25' /4 = (33.15 = AVE GRADE M GARBAGE ENCLOSURE DETAIL 6'CEPAR GARDAGE ENCLOOUKE 1X4 FENCE 13CAM APPROVED BY PLANNING A940 Z6110-1 Comer K Flag 9 ' It d Atbuka I wre t?10111d Actu,-d T_ EET FILE STR 9WA vil 5 _10- I fo ?1-779 PIM oth& jN4M. 21"f- S' Z q- 65- REBUS, JAN 27 20,09 S%LWG 0 PAMMENT 0 D1\ FEE AONDS C) z z 04 0 u 6wommi r4 0 Lu Q Lu (1) 0 (1) < U z < Z 0 LLI z 0 w �4 0 u it 1-9 fww REVISIONS: 11.06.08 01.27.09 RESUG, JP,N 2? N99 UIN I Eli: .27.09