Loading...
336 ADMIRAL WAY (6).pdfPR-r OF FOMON05 00A T 14' PAO& Aq LOT OF DI?Ys.rAcg 0 30 $22 458 790 720 258 720 AO' 529 2 ka4i3 7-SX so 182 151 1311 1W e ve 131 151 2 79 r4o is oL Of j3 52 7 m-- kD cc, te'k. -S,?C("q 250 70 6ar-IJ87, �1 V) LL. 710 �1 UA 0 0 LU U. tii 0 z -t-p C. 1,8C) a CITY OF EDMONDS BARBARA FAHEY MAYOR 121 STH AVENUE NORTH - EDMONDS. WA 98020 - (425) 771-0220 - FAX (425) 771-0221 COMMUNITY SERVICES DEPARTMENT I Public Works * Planning/Building * Parks and Recreation * Engineering * Wastewater Treatment Plant VIA FAX (206-789-7048) AND U.S. MAIL November 19,1997 Ms. Leslie Sacha Environmental Consulting Services 929 North 76th Street Seattle, WA 98103 Subject: REQUEST DETERMINATION OF PERMIT REQUIREMENTS FOR NEW AND REVISED PORT SIGNAGE Dear Ms. Sacha: I have completed my review of the Port of Edmonds request to amend the Shoreline Substantial Development Permit granted under File Nos. SM-96-147 and SM-97-70 to allow the replacement of signs damaged during the storm at the beginning of the year, as well as the installation of new signage to replace existing to provide a unified sipage package. I have reviewed the request pursuant to the requirements and provisions for a permit modification as contained in WAC 173-27-100 in order to determine if the requests may be granted, and the requirements for "normal repair and maintenance!' pursuant to WAC 173-27-040(2)(b). The proposed modifications and replacements are not considered substantive and do not materially alter the project in a manner that is inconsistent with the terms and conditions of the permit, the master program and/or the policies and provisions of chapter 90.58 RCW and therefore are approved as specifically stated below. 1. REVISED PORT SIGNAGE PROJECT ANuest: Proposed replacement existing Port signage with new unified sign plan which will identify new and existing Port buildings. Determination: APPROVED subject to the plans submitted with this revision request. With respect to the requirements for the proposed sign replacement plan to receive approval through the Architectural Design Board process, I have spoken with John Bissell regarding this MRT10.DW19-N0V-" * Incorporated August 11, 1890 0 00RUMLEMRS &WON 0 An A '0 0 g Ai` gi �-6 'jg 4", MiN 2-2, 4�1 matter and he has informed me that additional information is required to determine what portions of the sign program must be reviewed by the ADB. Specific signage request with exact locations, sizes and copy must be provided so that City Staff may determine if they are incidental, or if they Z require ADB approval. ADB approval will be required for non -incidental freestanding signs, and for any sign program with more than two, non -incidental wall mounted sips. F- cc If you have any further questions regarding this matter, please do not hesitate to contact me at 771-0223. LUI Sincerely, —0 _Comwnity Services Department - Planning Division LU ail �Jeeey S. Wilson, AICP X Planning Supervisor Z I­ il No. SM-96-147 LU LUI pe: I e 2 ml Jile No. SM-97-70 Mayor Fahey Paul Mar, Community Services Director Rob Chave, Planning hfimager X John Bissell, Senior Planner .Z Mr. Bill Toskey, Executive Director Port ofEdmonds 336 Admiral Way Edmonds, WA 98020 Z N 4 LAS I 0 a UJ x I!_ LL. UJ L) 8 z OF EDMONDS BARBARA FAHEY 121 5TH AVENUE NORTH EDMONDS, WA 98020 (426) 771-0220 MAYOR -FAX (426) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planninn/Buildinn * Parks and Recreation En ineerin e Wastewater Treatr6ent Plam C. Transmiffal Date: AugUStL29,1997 To: Leslie Sacha Environmental Consulting Services 929 N. 76th St. Seattle, WA 98103 Subject: SM-97-70N-97-104 Transmitting Agenda & Staff Reports For Your Information: X As you requested: For your file: Comment: Note attachments: 0. Diane Cunningham, Administrative Assistant CC. John Owen Eric Anderson 0 Incorporated AuSust 11, 1890 0 Sister Cities International — Hekinan, Japan /7% AUGUST 21.190f PLEASE PRINT LEGIBLYYOUR NAME, ADDRESS AND ZIP CODE BELOW IF YOU WISH TO -SPEAK ON THIS ITEM SM-97-70 & ADB-97-72 PORTOFEDMONDS "/4' kx/—/"qk 4 6 in ull� ui Lo uo- w uj! 60JI LL— uj LIJ us jil Ac" AN �Z- LLI U -J U 0 V) 0 U) LIJ LU = -i F- Ln LL 0 ul CC < LL D Ln 0 X LLr �- :r Z �- �- 0 Z F- LLJ LLJ 0— C) L-! LLI LU X U �- F LL 0 Z L Li Ln L) 0 Z 0 X EDMONDS HEARING EXAMINER", MEETING AGENDA AUGUST 21, 1997 AT 9,:00 'A.M., Plaza Room - Edmonds Utbrary. 650 Main Street 1. Call to Order 2. Public Hearings a. FILE NO. P-97-73- Application by Turnkey Builders for 'a Preffinh* Subdivision of approximately 1.54 acres (67,015 square fed) into 7 single-family residential buildings sites, each with a minimum lot area of 8,000- square feet. The proposed subdivisionincludes the development Of a new public right-of-way cul-de-sac from 218th Street Southwest to the'proposed lots. Ile subject property is located at 8718 218th Street Southwest and is zoned RS-9. b. RLE NO. P-97-68 Application by George Kairez for a PrelimWay Subdivision,:to subdivide approximately 7.40 acres in a RS-12 & RS-20 zone into 16 single-fiunily,lots with an average lot smiel of approximately 17,000 square feet. 'Me subject proposal also includes requests to modify the certain street development standards, specifically: reduce the private'roadway street -width by. elimination of the required sidewalk adjoining proposed Lots 13, 14, 15, and 16 from Talbot Drive, and a request to modify the required street setback from the access road from 25-fixt to 5-feet to allow the retention of an existing single-fiunily residence on the proposed lot. The subject property is located at 9117 Olympic View Drive. C. FILE NOS, SM-97-70 & ADB-97-72 Consolidatedpormit applications by the Port of Edmonds for compliance with the City Architectural Design Board site design criteria and a Shoreline Substantial Development Permit for the demolition of the existing single -story dry boat storage buildings and construct a new 30-fbot high Dry Stack Storage Facility for approximately 270 to 320 boats, a wash down facility, a boat storage, and repair yard, and reconfiguration of existing parking facilities. The proposed building is approximately 75,500 square feet in area with building dimensions of approximately 246-fect long (between the north and south building fi=)by 230-fect wide (between the east and west budding ficade). The proposed permit application also includes a proposed 2nd phase to the development which includes a proposed addition of approximately 29,000 square feet of officetretail space to the north side of the dry stack storage building. The subject property is located on the at the southern end of the Port property where,the existing dry boat storage is located and is zoned "Commercial Waterfront - CW." . . . . . . . . . . AUG-15-1997 12:18 CITY OF EDMONDS PIR DEPT. 206 771 0253 P.01 m le. Edmonds Parks & 700 blain Sueek Edwwis, WA. 08020 To: Date: Number of paga From; cmr shen: w Mons: Fax,phwc. CC: Pax Mona: 425-771-0253 1 REMARKS: ( C3 Urp4 0 For your Tc%iow [3 Reply ASAP 0 PIN" comment Ah- ?A- 0- 40 �v AI VV,/ IVIV xj,A Y7 Z I-- I-0. Z �- Uj LU 0 a LU Lull Z uj 0 0 Z liC E Mr. Sandhop stated that the property next door is a graveled used car lot. He also explain at there is multi -family residential to the northwest and single family residential to the west. Mr. S p pointed out that the elevation of the container will be about six feet lower than the abutting neighbo d are separated by fencing. Therefore, the container will not be seen by the residents behind the s' d only be visible from the front, which faces Highway 99. Boardmember Goodrick noted that if the Code defines this as a permane tructure, then landscaping .s r u id e e re s nt'a Sid en t e 0 ab b 0 u t* h I w H n g d e t n ei e so s s 0 S than ts tt c es in al th p W gh� d 'a d m d on p ar ly p e a 0 b s as a permane tru ture' then lam Id have to ,in a j z abl( should be required. / th ma al Boardmember Pierce pointed out that if landscaping is required, the t material would have to be quite n to an large in order to effectively screen the container, and would have planted properly in a sizable asphalt th w opening in order to survive. He suggested that alternatives e to either paint the container in some an n creative and pleasing manner or use a trellis -type structure plant material to provide the necessary screening. Boardmember Goodrick cornmented that murals and A*hics can draw attention to the structure rather than screening it. She suggested that the applicant coder using container plants. Board Chairman Young stated that historically&%en the Board has considered structures which appear corrugated the applicant has been asked to - ate that element, and to not require it of this applicant would be inconsistent with past policy and glorc nt. In addition, when considering other small structures along the Highway 99 corridor, the Boardj& required at least the use of container plants to offset the lack of available permanent landscaping, AV John Bissell pointed out that the C, Section 20.12.030 states that blank building walls should be softened by landscaping, and that s and shrubs should be used in the transition between pavement and buildings. It also states that re paving for parking areas end, a five-foot landscaping buffer and extruded curbing are req ired John Sandhop stated tha ter boxes could be used, however, since the container is twelve fed high, potted plants may not s n it sufficiently. Board Chairman Yo reviewed the alternatives suggested by the Board. John Bissell poi out that a structural review by the Building Department will not be required, and that the landscapin uirement is the only element of approval necessary by the ADB. Boardmem i Rubenkonig requested that the applicant be asked to return to the Board with a landscape e jc� plan for ideration. BCJ1RDMEMBER GOODRICK MOVED, SECONDED BY BOARDMEMBER, PIERCE, TO CAINIM"lUE ADB-97-88 TO THE NEXT REGULAR MEETING, SCHEDULED FOR AUGUST 20, $17. MOTION CARRIED. SM-97-70 PUBLIC MEETING TO CONSIDER A RECOMMENDATION TO THE HEARING EXAMINER FOR A PROPOSED NEW 30 FOOT TALL BUILDING FOR OUT OF WATER STORAGE OF UP TO 320 BOATS AND 29,000 SQUARE FEET OF OFFICE AND RETAIL SPACE, AS WELL AS THE RECONFIGURATION OF AN EXISTING PARIUNG AREA Port of Edmonds F 336 Admiral Way Arclutechual Desip Board MedmS Page 3 Aupa 6,1997 0 '10 Bill Tosky, Executive Director, Port of Edmonds, 336 Admiral Way, Edmonds, Eric Anderson, Architect, Ile Makers, 2112 Strdth Tower, Seattle, and Leslie Sacha, Consultant and Permit Coordinator, 929 No. 76th Street, Seattle, the applicant's representatives, were present. John Bissell presented the staff report and stated that the applicant is proposing to remove the existing single -story boat storage sheds'from the southem portion of the Marina and replace those with a 30-foot tall, dry stack storage building which will accommodate up to 320 boats, representing an in eas cr e of U approximately 1/3 more than currently located on the site. As an incidental use, an area near the southern 0 a portion of the facility will be used as a wash down and repair area for boats using the dry stack storage LU building. The existing parking lot, located to the north of the existing dry boat storage sheds will be re- m paved and re -stripped. U.; 0, Mr. Bissell explained that 29,000 square feet of commercial tenant space is planned for the north end of the :3! building and will be completed, along with landscape screening for the north side of the building, as the all second phase of this proposed project. I— X, z Ibe SEPA review has been completed and a Determination of Non -Significance has been issued. z UJ LU The proposed building will be 350 feet long and 240 feet wide and will have gray corrugated metal siding and a low -sloping green metal roof. Extended roof supports and knee braces will be white metal and doors OC ;7- will be a darker shade of gray. Lighting and signage have not been proposed. Mr. Bissell commented that the dimensions create large 3 —11 a massive structure, and the applicant has proposed fast-growing deciduous and M L) evergreen trees along the perimeter, a deck -type walkway along the western elevation, increasing the size of I— iz the eaves and setting each comer of the building back 16 feet to reduce its impact. �i_ 0 Z W John Bissell explained that the proposed facility requires access to the boat launch area as well as vehicle and pedestrian access to the site from Admiral Way. The large parking area to the north of the building 0 Z will accommodate automobile access and the promenade/boardwalk on the western side will allow access for pedestrians using the facility, as well as for those passing the property. R71 Although boat washing and limited repair is currently being performed at approximately the same location as proposed, the increased number of boats may cause a noise impact for the park property to the south of the site. In addition, Mr. Bissell stated that the applicant is proposing a chain link fence as a buffer between the park and the boat wash and repair'facility. He explained that while landscaping on the north" side of the building is planned later, in conjunction with the development of tenant space in that portion of the building, landscaping in this area would be necessary in order to meet code requirements. In addition, if the applicant does not complete the tenant portion of the project, staff feels that landscape mitigation should be required. John Bissell stated that while the proposal appears to comply with some sections of the Comprehensive Plan, it appears to be inconsistent by creating an impact to an existing park setting, where park settings are to be enhanced. It also appears to be inconsistent with the Zoning Code because no setback is provided where a 15-foot setback is required. In addition, the proposal appears to be inconsistent with the ADB design requirements found in Section 20.10.070(A)(4) because it would create a long massive building, He explained that staff feels conditions could be incorporated which would mitigate all these elements sufficiently to allow the application to be approved. Bill Tosky stated that this project is part of a series of three Port projects which have been in the planning phase for a number of years. The 30-foot height represents a reduction of the 45 feet originally planned and the upgraded facility will assist the Port in handling the large number of boats being housed at the Marina. Ardtitectural Design BOW Meeting Page 4 August 6,1997 ok Mr. Tosky agreed that the proposed building is large, however, the boats being stored all over the site in a variety of racks, sheds and parking lots, currently create a more undesirable view. He showed the Board some photographs of a similar, but larger building located in Portland, Oregon, and explained that the landscaping and colors soften the building's size considerably. Mr. Tosky pointed out that the larger overhang and setting back the comers of the building will help to mitigate visual impact. D U 01 Bill Tosky also agreed that while this facility creates some noise, it will be a continuation of the noise level I which has been there since the facility was first built approximately 35 years ago. While there will be more activity with the increase in the number of boats on the site, he pointed out that the public enjoys watching U.1 and taking part in the kind of boating activities which will be carried out at the facili e Po is so ty 11 rt al 0� willing to providing screening if required by the Board. Mr. Tosky stated that while the Port is willing to plant larger trees than specified in the plan, using the 51 smaller trees, of the variety spelled out, generally increase their health and make them more likely to ac survive. 0 Bill Tosky explained the Port has requested that an independent report be prepared regarding the possible Z I-- UJ LU impacts to the City's park and will be willing to negotiate with the City to minimize those impacts. The portion of the parking lot at the park which belongs to the Port is being taken back for Port use, but no park U to 0 ;: property is being altered. Ile Port also provides public access to, and assists in the security measures for the City's park. Ile Port has applied for a zoning variance for the setback requirement because they have provided a large walkway between the building and the waterfront for public access, however, that setback already exceeds Ui UY U . the fifteen feet required. Mr. Tosky pointed out that the walkway is over the water rather than on a bulkhead, and this was designed to enhance fish habitat. Therefore, the Port feels they have complied with 0 Z the intent of the zoning regulation. John Bissell commented that in making a recommendation to the Hearing Examiner, the Architecttiral Design Board must determine whether this application meets the criteria typically dealt with by the ADB. The Hearing Examiner wflI have to make a determination whether or not a zoning ordinance can be issued. He reminded the Board that the adjacent use, and whether mitigation is needed for visual and noise impacts from that use, are the issues to be considered regarding the City's park. Boardinember Rubenkonig asked Mr. Tosky for clarification regarding the term "we, the Pore'. HE �A Bill Tosky explained that the Port of Edmonds is an organization created by the citizens of the Port District, who elect three commissioners to be responsible for providing policy, direction and taxing authority for the Port and for hiring an Executive Director to carry out the overall daily operations. Over many years, the Port has purchased land and developed facilities to provide services for the boating community and the general public as well. He pointed out that the Port of Edmonds is not involved with commercial or cargo transportation at this time. Boardinember Rubenkonig commented that as a member of the ADB, she has concern for the public and their ability to enjoy facilities located on the Edmonds waterfront. She asked if ac s is d to e ces provi ed th public through the Port's indulgence. She also asked for clarification about whether the Port feels the boat storage area will be more aesthetically pleasing with the new facility when compared to the way the current storage area is arranged, and inquired about the public process which took place in planning for this facility. Arcititeftntl Design BoW Meeting Pap 5 N 9". Uji X. z I.- �_ 0 Z �— UJ UJ (n 0- 13 �- LU I LL 0 z LU 0) z M A Mr. Tosky stated that the general public, as well as the tax -paying pubdiblic, are invited to enjoy the Port's facilities in the same manner that people do who pay for the use of those = services. 71cre are many different groups of people who come to the waterfront area and the Port invites 2s them all, without restrictions. He also clarified that the Port feels the new facility will make the mariihina area more attractive, from an architectural or aesthetic point of view, than it is today. Mr. Tosky explalolained that the planning process has been on -going for a number of years and the public has been encourageDged to provide input during the Port meetings, which are held twice per month and are publicly advertised. A. Over the four to five years this planning process has been worked on, Mr. Tosky stated that the new w facilities have been on the public meeting agenda approximately one-third of the time. Boardmember Rubenkonig commented that she did not agree with the ioi idea that enclosing the boat storage facility would make it more aesthetically pleasing. She stated that as a rin member of the ADB, she must look at what impact this proposal will have on the general public who wish to oo use and enjoy the waterfront area. Referring to page 26 of the Edmonds Comprehensive Plan regarding - the downtown waterfront activity center, Boardmember Rubenkonig asked how it meets the requirememoient that a project must present a coherent vision for future development in the area. She also asked if a rl. Master Plan for the waterfront has been done and if so, why was this project not included. In addition,^ she asked for clarification as to whether this project is related in any way with the multi -modal transpoosortation project, which also has an impact on the park. . Bill Tosky explained that the Master Plan submitted by the Port hasp -as been approved by the City and incorporated into the City's Master Plan. It will continue to be updatemed at regular intervals. He pointed out that the Port is a participant in the study for the multi -modal I project, but is not a funding or management participant. If the multi -modal primary plan is adopted, . it would not impact the proposal being considered during this meeting, however, would eliminate the City"w's waterfront park. If the alternate multi -modal plan is adopted, however, it would have some major impacts -as on some Port property but would not affect this boat storage project. Boardmember Rubenkonig asked if the Port's parking spaces, which are I - being taken away from public use, will be provided for elsewhere. Bill Tosky stated that when all three Port projects are complete, there wilffill be more parking spaces available than there are presently. Boardmember Rubenkonig asked if public restrooms are being made a pa -mart of the boat storage facility. Mr. Tosky explained that this building is not a public facility. It is r-i replacing an existing boat storage facility and restrooms will be available for Port customers who use thmrrat facility, but not for the general public. He stated that there are two public restrooms which the Port mamintains on their property and they will work with the City to establish restrooms for the park as well. Boardmember Chalupnik stated that the pictures shown by the applicant - it do not present the full impact of a building of the size proposed and commented that he would prefer a difflifferent building design. He pointed out this building does not meet the City's design requirements. Bill Tosky stated after it is painted and the area landscaped, the building r, will present far less impact on the viewer. Boardmember Goodrick commented that use of a chain link fence as a bwouffer is inadequate and that a solid screen would be preferred both for visual and noise impacts. She also : 0 stated that it is her understanding that the use of smaller trees would provide healthier landscaping. ArcWteefinvI Dtsip Board Mftning Page 6 AUgust6,1997 W N N- X Ui. �- X z �- 0 W LU T� 0 a �- LU U- 0 z LU (A 0 z 1*1 [a Boardmember Pierce commented that the 2-inch caliper street trees are adequate and would be easy to maintain and promote healthy growth. He asked about the lockers along the west and south portions of the facility and inquired why there are no lockers, buffers or screenings proposed along the south side. Bill Tosky explained that the lockers are attached to the building and stick out slightly. He also pointed out that screening will be placed along the fence on the south end of the parking lot and because of the need to provide access for heavy equipment and emergency vehicles, that end of the building must be left open. The fire lane also continues eastward through the parking lot. Boardmember Pierce asked if picnic benches would be included along the promenade on the Admiral Way side. Mr. Tosky stated that sidewalks have been added on the Admiral Way side but public facilities are not planned in that area since it is away from the water and public interest and use is minimal. Boardmember Pierce also commented on the long unbroken ridge line of the building and asked if any modulation could be added to mitigate that element. Eric Anderson explained that notches were removed from the comers so the visual massing was reduced from that area. The roof overhang was increased from the normal six inches to approximately four feet and will be supported with knee braces placed every thirty feet which match the knee brace theme they have incorporated into their other buildings. He also pointed out that the landscaping will provide additional buffering. Boardmember Pierce asked for clarification on the visual height line relative to the boat moorage structures previously approved. Bill Tosky presented diagrams which pointed out the visual height line from 3rd and 4th Avenues. Boardmember Rubenkonig asked for clarification as to why the proposed building is not set back further from the park boundary and the reason the Port will be taking back their parking spaces which are currently being offered for public use. Mr. Tosky responded that the boat storage/handling building needs to be in close proximity with the water and boat launching facilities previously approved. Ile entire facility has been moved further north than the existing buildings and is located as far from the park as possible, while still allowing for water access. Ile park patrons have been using Port property for parking and these spaces will now be made available to Port customers who use the boat storage flicility. Tle total number of parking spaces which will be available for both park patrons and Port customers will increase overall, however, some park patrons will have to walk a short distance further than they do currently. He explained that contained in the long-range plan is the installation of a deep -water dock. If that dock is built in the fiiture, the access would be through that Port parking lot, and in order to eliminate impacts to the park it is imnortnnt tn �t— ^u W- future accesses to that dock area, Boardmember Rubenkonig stated that non -boat user patrons exist and are being adversely impacted. She reiterated that to remove the parking spaces from public use for the adjacent park creates a conflict and would like to see other arrangements made. Board Chairman Young pointed out that although the Port has previously made their property available for fima rty public parking, either by assumption or by agreement with the City, it is their own legi te prope and Ardtiteeftual Design BoW Meding Page 7 AugU96,1997 0 0 feet it is necessary to use that space for their own operation. In addition, the previously approved promenade added by the Port, with access to the waterfront, created an offsetting public benefit. Z Mr. Young also suggested that Boardmembers state those specific sections of the Comprehensive Plan or < Design Guidelines if they feel the proposal is not in compliance. UJ, cc �� Boardmember Chalupnik stated that the building lacks modulation and does not meet the criteria used by UJ U -J uo� the Board when approving other buildings. He explained that the criteria should not be changed for this U) OL application. (n LIJ LU -J U) U.1 Board Chairman Young stated that the first item the Board needs to consider, when formulating a UJ 0! recommendation to the Hearing Examiner, is policies from the Comprehensive Plan. He asked the applicant's representatives how this proposal enhances the shoreline features to include a full spectrum of Lt <n recreational activities, park settings and marine facilities. 31 X! Bill Tosky explained that this proposal provides a significant increase in marine services and water access Z �- for boaters, and does so with much more efficiency than other facilities of its kind. The population of the �- 0 Z community has tripled since the marina was established in the mid-60's and this is an attempt to pro de vi LU LU increased boating services commensurate with that increase in population. 0 Board Chairman Young asked for clarification on the elements of the proposal which provide for the a ;7. - elimination of large and inadequately landscaped or paved areas. LU W1 01 Leslie Sacha responded, using an aerial photograph, that the existing site is not landscaped. She pointed Z% out that landscaping on the site will be increased to an amount that is in compliance with the Code. LU 0 U MI., I-- i--�, Board Chairman Young asked for a summary of elements which will be included to provide rest and 0 1 Z comfort areas for citizens while in this business district. Bill Tosky explained that the previously approved Port project provided benches and picnic tables along the waterfront walkway area as well as water viewing platforms. Negotiations will be held with the City to create improved restroom facilities as well. =T- am EN Boardmember Goodrick suggested that the proposal could be in compliance with this element of consideration if benches were also added along Admiral Way. Pedestrian use has not been encouraged primarily because there are no benches available. That addition would also add a park -like and pedestrian - friendly feeling along Admiral Way. Boardinember Pierce commented that the street trees being added along Admiral Way will also create a more attractive area for pedestrian use and adding benches in this area would be very desirable. Boardinember Rubenkonig asked for clarification regarding the prior approval given to the Port project, which included the waterfront walkway, and whether it was clear at that time that 25 parking spaces were to be eliminated from public use. John Bissell explained that the parking space issue is a part of this proposal and was not discussed in the prior application which included the promenade. Boardinember Rubenkonig stated the plan to remove those parking spaces from public use limits easy pedestrian access to the beach which is contrary to ECDC Section C.2(a). She commented that this meeting is the first time this issue has been made available to the public. Amhitedural Design Bo&A Meeting Psge & August 6,1997 z .!I LIJ JO Ln 0 :n LU 53 X -J LO LL. 0 UJ n :J- uj� 0 Z �- LU LU 0- 0 �-! LU WI z UJ (b 0 z E co Bill Tosky explained this topic has been discusseod many times at open public meetings by the Port Commission during the past two to three years. F-He added that when the project is complete the total number of public and Port parking spaces will be gr=ater dw what is available currently. These 25 spaces are being re -designated for Port tenant use through thae use of fencing and will require the public to walk an additional 50-100 feet to reach the park. John Bissell noted that this meeting is the first time - the project has been discussed by the City, but it has been discussed on several occasions by the Port Comamission at its public meetings. Board Chairman Young explained that because the IPort is a public entity, their meetings are open to the public and their agendas are published prior to thecir meetings. He then asked how the site layout is coordinated with the existing buildings regarding beauutification and urban design or if there is any aesthetic link between the proposed building and any other Porrt property. Eric Anderson pointed out that there are three Port perojects being planned but as yet unbuilt. The Marine Center building, which is 40,000 square feet of mixec:d use office and commercial space, will be built on the north end, cast of Admiral Way. The second is the b suilding being proposed, and the third is an addition to this proposed building which will likely be built witHhin the next few years. The same extended overhang and knee brace theme, color scheme, window treatmeant and landscape design will be used throughout. Board Chairman Young asked if the site design provi ides adequate separation of vehicles and pedestrians to avoid conflicts. Bill Tosky explained that two features were added to improve safety significantly. The first is the addition of the sidewalk on Admiral Way and the other is Whe waterfront walkway and viewing platforms which separate the pedestrians from the boat launch operatitions and allows pedestrians to view the area without walking through it. Board Chairman Young requested clarification on hs.ow the proposal satisfies the stipulations that on -site parking spaces and paved surfaces should be kept WD a minimum, joint -use parking arrangements and M*-* lieu parking payments are encouraged, and only t!'he absolute minimum number of parking spaces to accommodate the uses should be permitted on site. Leslie Sacha stated that the Port prepared a comproehensive traffic study which was submitted with the Shoreline Permit application. This study evaluated.1 existing parking as well as parking which will be available when the Port development is complete, incEuding the 29,000 square foot addition and the Marine Services building. The study was also discussed with A City staff regarding how code requirements would be met with the Port's planned uses. The City's park;dng requirements are considerable and the proposed amount of parking is not in excess of what is requireo:d. There will be 35 additional pull -in parking spaces added on the west side of the boat storage facility a1c)ng Admiral Way. These spaces will be available for both Port tenants and the general public and the majotarity of these spaces will be within 300 feet of the park which meets the guideline in the City Code. Bill Tosky clarified that the Port's peak parking days - are dramatically different dw normal days and 98% of the amount of parking needed for a peak day is cumTently provided. Each summer, on a few key holiday weekends, the parking is typically full in the Port areaA. Every other weekend there are usually many spaces available. Boat users are a small part of the peak day- parking users at the Port. Board Chairman Young questioned the zero setback Itfrom, the bulkhead which is being proposed, since the Code requires a 15-foot setback. Ardtitectural Design Board Meeting Page ! 9 Aupst 6, 1997 Z U1 L) 0 C) LU LA. 5 Z �- 0 �i I-- t.0 LU 0 a != LU LU LL C Z UJ Cr 0 Z V- L*1 [a John Bissell stated that the ADB does not have authority to determine whether or not a project is in compliance with the criteria for approval of a valiance and the Code states that staff will inform the ADB whether a project is in compliance with the Zoning Ordinance. It is up to the ADB to determine whether or not a project is in compliance with the Comprehensive Plan and the intent of the 15-foot setback, as interpreted by the applicant� will have a bearing on the recommendation the ADB makes only if shown in the Comprehensive Plan or Design Guidelines. Board Chairman Young summarized the criteria and purposes of the Edmonds Community Development Code as they pertain to the applicant's proposal as follows: all elements of building design should form an integrated development harmonious in scale, line and mass, and building elements include all exterior elements and colors; and a minimum of five feet landscaped groundcover in all planting beds. He then clarified with the applicant's representatives that these criteria and purposes were met. Bill Tosky indicated that they were. John Bissell pointed out that while the items indicated in the staff report are those which seem to be most pertinent to the application, any item in the Comprehensive Plan or Design Guidelines could be addressed if the Board feels that it is pertinent in making a recommendation. Leslie Sacha asked if the Shoreline Master Plan is a part of the City's Comprehensive Plan. John Bissell explained that it is not a part of the Comprehensive Plan as it exists today. Previously, it had been included, but with the adoption of the Comprehensive Plan in 1995, the Shoreline, Master Plan was separated out. Those issues contained in the Shoreline Master Plan which relate to the Port would be issues to be considered by the Hearing Examiner, There were no audience comments on this proposal. Boardmember Pierce asked, regarding Section 20.10.070 dealing with long, massive unbroken structures, whether the design for a single, long, totally covered free-standing building was used to serve a specific purpose, and would multiple buildings be as usable for this type of facility. Bill Tosky pointed out that there are actually four outside buildings connected at the comers and one building in the center. Ile four buildings are connected to provide operational efficiency and minimize the amount of land required to store the boats, and as a security measure to avoid having the public in the area where heavy equipment operates. Eventually a building will be added to the north end of the site which will house the retail office complex. Boardmember Pierce recommended that on the eastern elevation, at least three additional planters containing street trees be added to increase modulation and screening. In addition, he pointed out that the small plaza area located mid -point from the Port along Admiral Way would be an appropriate place to add benches for pedestrian use. Mr. Pierce commented that the west elevation with the boat lockers and retail space is adequate. Without the retail space added, however, the north and east elevations appear too box. like and he suggested increasing the landscape buffering in those areas. Mr. Pierce also stated that he would prefer to see additional modulation on the building. Board Chairman Young mentioned that in other instances when the general mass of a building appeared too great, the applicant returned to the ADB with a proposal which included additional modulation, and that the Board could make this a part of their recommendation. Architectural Design BoW Me -ding Page 10 August 6, 1"7 10, C.) Boardmember Goodrick stated that the landscape buffer would disappear to a large extent in the winter when the trees are bare, and asked Boardmember Pierce to comment whether he felt the landscaping would be adequate to offset this element. She also asked if adding additional conifers to the landscape plan would give effective screening. !i : LU: Boardmember Pierce pointed out that the medium -grade plantings will help somewhat, however, additional modulation on the building, particularly on the upper portion, is needed. He explained that if additional 0 01 conifers were added, a large area of approximately 20-30 square feet would have to be available to allow Di those plants to achieve the size needed to provide an impact. W� M:i U.1 Boardmember Goodrick also agreed with Boardmember Pierce that adding park benches along Admiral 0 i,j Way to enhance the public use area would be recommended. Z I— �_ 0. Z �— LU Lu U CA 0-1 a t�, LU LU' Z LU tn 0 Z r— E Boardmember Chalupnik commented that the proposal does not adequately separate pedestrians from vehicles due to the fact that, with the Port's re -allocation of parking spaces in the park area, pedestrians will be required to walk across the entrance of the parking lot. He also commented that the proposal is for a long, monotonous building which is not in compliance with the Community Development Code. Boardmember Rubenkonig referred to page 26 of the City's Comprehensive Plan, section A, which encourages proceeding with a program providing for a more livable, beautiful and successful downtown area while preserving the small town atmosphere desired by the citizens, and commented that the proposed building does not satisfy that criteria, nor does it comply with ECDC Section 20.10.070(A)(4) regarding the avoidance of long, massive or unbroken buildings. Since the proposal includes five buildings, she suggested that there may be a way of changing the design to comply with the City's guidelines and be of a scale which is more appropriate. The need for additional modulation must also be addressed in order for the proposal to be in compliance. Ms. Rubenkonig referred to page 26 of the Comprehensive Plan, section A, paragraph 3, which recognizes a coordinated and mutually�supportcd development between the Port, the multi -modal transportation plan and beach open space facilities, and stated that by re -allocating parking spaces and placing those spaces behind a chain -link fence, this proposal will create a community conflict which is contrary to the guidelines. Board Chairman Young and Boardmember Pierce asked for clarification regarding the process of reviewing this proposal. John Bissell explained that the Board must make a recommendation to the Hearing Examiner regarding the, compliance of this proposal. If the recommendation is for denial and the Hearing Examiner agrees, then the applicant may re -apply and appear again before the Architectural Design Board with a revised proposal. With a consolidated hearing process, the applicant has only one hearing and one appeal opportunity. Therefore, the Board cannot continue this meeting for further deliberation, nor can the Board require that the applicant return to the Board for a second hearing. BOARDMEMBER PIERCE MOVED, SECONDED By BOARDMEMBER RUBENKONIG, TO MAKE A RECOMMENDATION TO THE HEARING EXAMINER THAT SM-97-70 BE DENIED, BECAUSE IT HAS BEEN FOUND THAT THE APPLICATION DOES NOT COMPLY WITH THE ZONING ORDINANCE, AND DOES NOT COMPLY WITH EDMONDS COMMUNITY DEVELOPMENT CODE SECTION 20.10.070 REGARDING LONG MASSIVE UNBROKEN OR MONOTONOUS LINES OF BUILDINGS, PARTICULARLY ON THE NORTH Architectural Design Board Meeting Page I I August 6.1997 z I-- 0 UJ UJ 0— Q W UJ X C> �— iz L-L 0 z 0 z N E AND EAST SIDES OF THE PROPOSED STRUCTURE, AND IN ORDER TO RECOMMEND APPROVAL OF THIS APPLICATION, AN "PROVED VARIANCE WOULD BE REQUIRED AS WELL AS ADDITIONAL MODULATION INCLUDED. MOTION CARRIED WITH BOARD CHAIRMAN YOUNG VOTING NO. 7. DISCUSSION OF ITEMS APPROVED By STAFF WITHOUT ADB APPROVAL John Bissell explained that the finish on the building located at 5th Avenue and Main Street is stucco and the applicant is proposing changing the siding material on the entire building, which complies with what the staff can approve. If the proposal was to change the siding material On Only one tenant space, it would not be in compliance. Mr. Bissell stated that the flat apartment roof at 21112 - 80th Ave. W. was damaged in the winter storms and is being replaced with a pitched roof which complies with the City's height requirements. He explained that Boardmember Oaklief, who helped create the ordinance which gives staff the authority to approve proposals such as these, agreed that the intent of the ordinance was to allow staff to deal with this type of project without needing the approval of the Architectural Design Board. 8. BOARD DISCUSSION Boardmember Goodrick requested an updated list of Board members. She also commented that it has been brought to her attention that the ADB previously gave an annual award for an outstanding project and wondered if that program was going to be continued. John Bissell commented that he would make sure that an updated Board list is made available. He also explained that the award system was discontinued several years ago. He stated that it could be resumed if the Board wishes. Boardmember Goodrick stated that an annual award system may provide an incentive for applicants to produce good proposals for Board consideration. Boardmember Rubenkonig thanked the Boardmembers for their efforts in considering the proposals at this meeting. She noted that having the other two Boardmembers present may have made it easier to identify acceptable alternatives to the building design proposed by the Port. Ms. Rubenkonig also explained that because she is a new member of the Board, she sometimes needs more information to fully understand each proposal. Boardmember Chalupnik pointed out that each member of the Board had different concerns about the compliance of the proposal. Boardmember Pierce explained that Ife needed to clearly understand the review and recommendation process before making his decision, and pointed out that in certain situations, the ability to hold only one collective hearing can make the Board's deliberations more difficult. Board Chairman Young complimented the Boardmembers for identifying the appropriate elements which caused the proposal to be out of compliance. He explained that by recommending denial, rather than approval with conditions, the Board may have lost an opportunity to suggest positive changes in the design since there is only one hearing taking place. ArWtechrd Desip Boud Meding Pap 12 August6,1997 % 1 4 CITY OF EDMONDS, .BARBARA FAHEY 121 STH AVENUE NORTH EDMONDS, WA 98020 (425) 771-0220 FAX (425) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works Planning/Building - Parks and Recreation Engineering Wastewater Treatment Plant z < LU Transmittal uii n Date: August 7, 1997 (a LL To: ADB Applicants 0) a X ut Subject: ADB Meeting of 8/6/97 01 LU LU! Transmitting ADB Synopsis 0— For Your Information: X uJ LU x I— I As you requested: U. LU 0 For your file: Comment: The appeal period of your item Will be up on 8121197 at z 5:00 p.m. Note attachments: Sincerely, Diane Cunningham, Administative Assistant W Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan t 4-4=� I T 0 0 Notice of Development Application & Hearing Examiner Public Hearing Date of Notice: August 7, 1997 1 File # SM-97-70 & ADB-97-72 Applicant Information Permit Information Name of Applicant: .......... - Port of Edmonds Requested Permits Plat Date of Application: ............. May 14,1997 1 and Approvals: cde Application Complete: June 20,1997 Other Required Permits Unknown not yet applied for (if Protect Location:....— Southern end of the Port property where known): ........... .............. molding dry boat storage is located. Required Studies related Unknown Paijact Description: ..................... Consolidated application for compliance with ADB to the project: ................. criteria & Shoreline Substantiel Diwelpereat point .,he reinsertion of the misting dry boat storage bldg. & constrout 30 ft. high Dry Stuck Storage Related Environmental Critical Areas Checklist Willy, wash down fad! ity, boat stomp & operr Documents: ............... yard & reconfiguralion of eveling nedir; fiedlities. The proposed application also includes a proposed Public Comments Due:.. August 21, 1997 by 9:00 A.M. 2rd phase to the development .1relt trend. . addition of pp-. 29,000 sq. ft. of flucchrokil City Contact: ............... — Jeff Wilson space. The propertyieconsdOw'. Public Hearing Information Date: AUGUST21,1997 Time: 9:00 A.M. Place: Plaza Meeting Room - 650 Main St., Edmonds Intersection on this development application ean be vievved or obtained at the City of Edmonds Community Services Department, 121 Sth Avenue North, Edmonds, WA 980X (425) 771-0220, Public comments should also be sent to this address. The decision an this development application will be made within 120 days ofthe date ofthe Lemer ofComplerecess, with allowances mordefor mucedur and additional information requests Note that ability to Ppeal a decision & —If" uponp�ticipationinihepemitdecisionprocess , Tor The mmmal,mulliation,destmetion,orconcealmentofthis This notice may be moved Warningil notice befare the hearing date Is a misdemeanor punishable by fine and imprisproment. after. August 21, 1997 25XI 32XIE] VFII;� j N A� fi _V, V' ATTACHMENTB ADJACENT PROPERTY OWNERS z 2: 232703.1-04,5.0004 232703-1-05'7-0 9 00 L) ESC Associates in 232703-4-003-0008 Burl Fort Nofthern Railroad Co. 0 3131 E. Madison SL. Suitt 202 777 Main Street L. Ardean Harold R. Stone 4: Seattle. WA 98112 14277 Worden Way U) Lu, Fort worth. TX 76102, uj.�I Saratoga, CA 95070 _j U) U. 232703-4-01 I.000g —0 w Union Oil Company 232703-4-012.0007 232703-4-013-0006 P.O. Box 7600 Port of Edmond' Margaret B. Vorwick Trust Los Angeles, CA 90051 s c/0 Brice Inv. Realty LL Edmonds. WA qg020 9450 SW Commerce Circle X U) I WiLsOnville, OR 97070 ._,_N�/014-0005 327R-4/-64-0004 Port oty onds Fort of rmonds 75-0001 Uj Lu K�I! Edmoe4 WA 98020 Port qPK( onds Edmop6s\WA'98020 Edmlbndf, WA gso2o U U) 0— Lu LU 2327034-094-bQ08 13270' -086-0009 Cial�Edrnopqs. Ci 1_ �t Fort 232.7,03, -0005 onds _r Edrn �L_ 0 'v Z� 0 WA 98020 250 Fi*,, nue N. Port Wolmonds LUWUJ n Edra6ndk WA 98020 n A 98020 1:).)-0006 z 'o orl 0 onds 233ZO3 ,14-158-0001 A 132'k3*159-000 250 F* venue N. Poh)(Edmonds 0 'is Edmin nds. A 98020 Edrj(on&. WA 9SO20 Port oXdmonds Edrn/ncR WA 98020 Leslie Sacha Environmental Consulting 929 N. 76th St. Seattle, WA 98103 %N 0 0 n, gn- N �M;