336 ADMIRAL WAY STE AJV
SNOHONIISH CO
FIRE
D k1- d' I
IST&F low'
A*'D?"n''*Y1zAt I '6j"O. jlrk�
oervink Brier, Edmmds, and 12425 Meridian Ave S
Mowitlake Terrace Everett, WA 98208
. Phoize (425) 551-1200
www.FireDistrictl.org Fax (425) 551-1272
LOCATION: 336 Admiral Way Suite A 98020
BUSINESS NAME: Port of Edmonds - Shop
MAILING 336 Admiral Way, Suite A, Edmonds, WA 98020
ADDRESS:
BUSINESS OWNER: (�n ,-
EMERGENCY-1: POE Security
KEY ACCESS-2:
EMAIL: NAJ
PERSON CONTACTED:
NAME OF INSPECTOR: Q�—P'A.Q-lk
I %— (z
Date Last Serviced: ko 14
4257748878
PHONE:
FIRE PREVENTION
INSPECTION REPORT
)4EDMONDS
L1 BRIER
0 MOUNTLAKE TERRACE
0 UNINCORPORATED
Fj6?FNCY STATFV SHIFT'*'
SCHEDULED Aug 2017
DATE DUE �
I TUT--
UFIR k
HOME PHONE: P7.'s -N 6"541a,
4255087490 e -
HOME PHONE: 17 CURRENT YES NO
HOME PHONE: CITY
BUSINESS
LICENSE
INITIAL INSPECTION DATE
1A.
..'FIRE'PREVENTION
Serving Brier, Edmon8s, and 12425 Meridian Ave S 114SPECTION REPORT
SNOHO Isfi Co. Mountlake Terr . ace NEDMONDS
Everett, WA 98208 0 BRIER
FIRE Pbone (425) 551-1200 0 MOUNTLAKE TERRACE
[I UININ,�ORPORATED
DISTR T www'.FireDistrictl.org Fax (425) 551-1272
336 Admiral Way 98020
e' FREQUENCY
2017
I STATION & SHIFT
17-B
LOCATION:
BUSINESS NAME: Port Of Edmonds.Office
PHONE: 4257740549
SCHEDULED Aug 2017
DATE DUE �
591
MAILING 336 Admiral Way, Edmonds, WA 98020
ADDRESS:
LIFIR
v-\()p4fr\-
C)
BUSINESS OWNER:
HOME PHONE:
Port Of Edmonds
EMERGENCY-1:
HOME PHONE' 17 rCURRENT YES NO
KEY ACCESS-2:
0-1 Lr
HOME PHONE:
CITY
BUSINESS
EMAIL:
LICENSE
PERSON CONTACTED:
INITIAL INSPECTION DATE
NAME OF INSPECTOR:
:11RESYSTEMS: FA03/15FE10/13
AAA FIRE & SAFETY, INC
3013 3RD AVE NORTH
(W IU13
SEATTLE,. WA 98109
EDMONDS
FIRE DEPARTMENT
'THE NONTHWESTS MOST TRUSTED NAME IN FIRE PROTECTION"
FIREALARM SYSTEM
Status,GiVen
(bne System per Report).
RED
W
WHITE
CONFIDENCE TEST
I JX[
REPAIR
Sorinkler Monitoring' Panel?
Occupanc Address - - 336 ADMIRAL WA-Y
Occupancy Name, PORTOF EbMONDS
Res ponsible. Person
First & Last Name': BRIAN Menard
Phone NUmber'-.
Responsible Person
Address, City, State, Zip,
Responsible,p.arty bmenard gportoifedmonds.org
E-M.ail Address
Date of Inspection; 04/115/20 16 0*9:00a-m. PDT
Inspecti.on Annual x
FreqUency/Typ e-,- Quarterly'
Testers Name Mark, Hagen, Bryce Cropper
(Please Printy.
Ni6et-
Number'. -7 H00040
Identification
Number:
S ystem. Loca . t ion EleVator room
-Central station monit9ring? Yes [3 No El
Monitoring
Moniton' ng,Required?" y6s 11 Nor],
Company Name:
System Make: 120 vac Sb with.elev. recall. Syst0th Model:
FIRE C013i VIOLATIONs FOUND: 6f additional room is needed,,. please add a. separate shee t)
CORRE&ONS MAbE*' Date. GoreOcted.
Corrected Bq-'
(ifadditibnalroom-isne6d�d,lpl6eks-ea0d.a.§eoar6tiB!shei6t)* Ni6of Certification Nurnber.�.
Thisucertifids that-thi,s,fire and lif4i.,safety system hastedn Oropeyly irfspected for reliability to. cover the
moort and j s-iste-
Items. listed in this rL s con nt*ithfire�
DepArtriient*, Fire.Code sta�hdards, a0d 'that'
d
discrep9ncies'are noted an v b
-the building,'0wher/Manager forcorrectiV6,adtion...
e te
gign.ature. of, T . s DMI
Phone (206).2t44721.
Building Representative�- (sionature), IV,
Fire�Alarrn Systems Page 102-
The items on �he checklists below shall be inspected and tested. This list does not constitute all of the required inspecting and
testing of the fire and life salety system. Refer to the Fire Code for inspecting and testing requirements.
Alarm Svstem Functionalit
1. Trouble signal with AC power off? Yes No E]
2. System operates properly on battery backup? Yes No
3. Battery voltage (no load) volts
4. Battery voltage (full load) volts (signals operat4q/C oni
5. Charge circuit voltage Xvolts
6. System operates properly on standby power? Yes Noo
7. All signals operate on AC power? Yes No [-]
8.
Number of initiating circuits
9.
Number of signal circuits
10.
Does alarm system meet audibility standards as accepted?
Yes
Noo
11.
All circuits checked for electrical supervision?
Yes nX
No
12.
All auxiliary equipment operates (Elevators, fans, dampers)?
N/A
Yes
No
13.
Ventilation controls operate?
N/A
Yes
Non
14.
Key to panel available?
N/A
Yes
NoE]
15.
Materials and equipment needed to restore pull stations are available at the
N/A FXI
Yes E]
No[:]
main panel, e.g. glass rods, and plates; keys and allen wrenches, etc?
16.
Operating instructions at panel?
Yes
No
17.
Trouble indicators function properly?
Yes
No
18.
Remote Annunciator Panels function properly?
N/A FXJ
Yes
Non
19.
Elevator Call Down functions properly?
N/A
Yes
NoE]
20.
Test record posted at panel?
Yes
No
21.
General alarm automatic time delay _ (minutes)
N/A
22.
Was a signal received at the Central Station monitoring company?
N/A FXJ
Yes
No
23.
Other Devices (Specify)
Yes
No
System Devices
Total Number of
Units in Building
Total Number
Units Tested
Test Results Acceptable
24. Bells, Horns, Chimes
1
N/A Yes No El
25. Voice Speakers (Voice Clarity)
N/A Yes No
26. Visual Alarm Devices
N/A 0 YesE] No
27. Smoke Detectors
1
N/A Yes No
28. Heat Detectors
1
N/A Yes No
29. DuclL Detectors
N/A FX_1 YesEl No [:1
30. Sprinkler Flow Switches
N/A FX_1 Yes No [:]
31. Sprinkler Supervisory Switches
N/A R Yes No El
32. Manual Pull Stations
N/A N Yes No
33. Annunciator(s)
N/A FX] Yes No
34. Beam Detectors
N/A X Yes No
35. Automatic Door Unlocks
N/A FX-1 Yes NoEj
36. Automatic Door Release
N/A FX-1 Yes No El
37. Fire Dampers
N/A 0 YesE] Noo
Communication Equipment
Total Number of Units
in Building
Total Number Units
Tested
Test Results Acceptable
38. Phone Sets
N/A [:1 Yes F No El
39. Phone lacks
N/A Yes F NoF
40. Call -in Signal
N/A Yes [] No [j
Fire Alarm Systems Page 2 of 2
Viking Automatic Sprinkler Company
KIN& 3434 First Avenue South
Seattle, WA 98134 NFPA 25 Testing
2066224656
SPRINKLER SYSTEM 5 YEAR TEST DRY 11 WET 11 DRY STAN
'Name: Port of Umondt",-
b 6 n s Oc u** a
cupancy.Addre'ss: 336 Admiral W8y,Edmo C P, ncy
4,
' �§pp
2R �0�,:,Fer
42��,'-7��7,4i'05491
L a rh C O§tdhT P ow urn e r.
igst'N e h
,Ffik, hri
61 0 336 .Admiral Way;
� j�'k
Res
W) Po
mo 1§,
19
t y, ta t e;' Z ip s
'd
spqnsJ1. e�: . erson.4 P
d E mafl��
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
'Ma
es
xi
ehc
T
y
Riser Valve Make: Riser Valve Model:
System Identification No. System Location:
DEFICIENCIEs FoUND? Yes C3 No
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
REP*
9,
6rie`cibd`l3-y.
Dat
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) __�rl &n . OJ\e V.1�1 Date q/_7 //-�_
Print Name and Title
Direct Phone # Email:
Building Rep unavailable C3 Building Rep declined to sign report C3
Sprinklers NFPA 25 Page 1 of 3
SPRINKLER HEADS
1 . Th-e-Standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No" have thbrh�s Sample tested or replaced per 2008 NFPA 25 and at the prescribed
intervals thereafter. -
Due date for sample testin�_�
-2
- jhd Quick Response sprinkler heads are —,�an 20,years old.orwithin a
d.
prescri6edjestiridperici
lf."No"�have the heads sample tested or replaced per 2008 and at NIA 0
the prescribed intervals thereafter.
u ' D date for sample testing:
e
.3w nThd dry type sprinkler are less than 10 years old or iMthin, a.
-prescribe period.
W aVe the heads -sample tested or replaced per,26.08 NFPA 25 and- at 'N/A.' 173
the prescribed intervals thereafter.
-,.'Due'dgte.f6rtami)16.testinq:
'u
ce on a ges
s
u�
rri6iht'e'rian* es slup-to-da"fe"
ug
lo i -f h
:'I'o�,`Du e date. r. ene�t��cdmmpa son tes
a califfrateti-96"e-eyAn
',Note:. The.system. gauges are to be compair6dvitli` five,(
e
ars.-. IT-a-gaug n 3% 6f:th vau e,
,ye
reca aited. Thischd6k sho uldlla�d���
" ", libr* Z��rsif6 `s-iai4i�pressure-- s h
e,is not.withi e,�dalibraitodl, SHW
_u I _q.
Ah
n
I OBSTRUCTION INVESTIGATION
No C3
brifiectiob-(17PP), piping is U
ihi.52yb roustrudffN� gation of.'Fire' �Db* partmenCG
stil
dai inaccordance with 20108 N am 14; (e* 1100
bst `U i6 1 v stic on-
�h
R.16atbj 6r� ext FD o r ct n n e .1all
6 d'kigt
Q d o n of. t h e c
obstruction e e FDC(s ing heck.
Nvi
.:es
lve.
3. Ttie-5--yeaMbstruction Examination of the sprinkler piping is up-to-date in accordance �Yes C�3��
with 2008 NFPA 25 Chap. 14. (eff. 10/21/2012)
Date for next Pipinq Obstruction Examination
DRY STANDPIPE
t6h '6�wa�'.hydr6stati6ll�t6sted-atfiot�le'ss.th'�in-.-20'0�osio"r.�50,':"*'i
-PIP'.
.acce s , s . of, ss , ure,where maximury) pressur6,is,inexcesi'
N/A,. - C].
P.S
,:f;`"(_Thb- I' d 'pe FireDep6rtmentConne'ci' n(�)(FPC):is1'd&6r'6f b6shes',
s an' t o
pil
N/A
Y s
NO-'
��'94qrds. &6ther�debris and is visible frorfi,the'street'.-'�"'_
3. All FDCs and hose valves have protective plugs or caps.
N/A 0
Yes
No C3
Z —1f a ''k g* from a,*FD-*d t*,h-e,*,.-
.p ug,.or cover wclsmissin pipinig.Was.in.speq e
Yes..
No -
1��deb'4.,'bhi�*is�-r' A—
N/A
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A C3
Yes A
No CO3
6.-..' All swi v*61sjurnfreel y*
NjA C3
Y,e,s,,'
, o
NQ 0
I . - . . : J
FINAL CHECKS
Was -rem" 6ved. from,test-mode ai ecau (onary_�
he Fire' idior other pr ti''
.a u,"', e, moved io,reistorefir6411ai
6 s res.-were r rn system.to- normal N/A
..,o era ion includes rieriibv'al oUp rote.9tive coverings
6
2. The system was left in service.
YeSA
No C3
If "No", why
�3.-:: The confidd'nce* test report -was given to the owner and a,current statusjaig, was. posted.
Yes
A:'�.The,confidencejest repbrtwas. sent to'the fire marshal s�offjce.
S
173,
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
KIN& Seattle, WA 98134 NFPA 25 Testing
1 2066224656
SPRINKLER SYSTEm 5 YEAR TEST DRY C3 WET C3 DRY STAN
7 7 7. FF,-
Occdpancy.Add
,-�36 Admiral Way, Edmonds, Ocdupancy,,N6ffi&. .'Port of�Edmonds
R68p,'Ohsible' Person,,.
0549�
Chris Qstd �Phone, N6nt-
a ,e
si'
rman,�,*
0e60ohsibl6':R'erso; —336- dmital'Way
AddVOSS
,;I Is-
sterrnan@,portofedmonds.o
biiAadres�W, 60
dmondsWX*98020
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
r
Td§PF�6`
Riser Valve Make: Riser Valve Model:
System Identification No.. - System Location: Rb c
DEFICIENCIES FOUND? Yes 13 No
List items that were not corrected at Mthe time of the confidence test.
Use the Deficiencies section or attach itemized sheet
Aw
low,
U S
�-IREP RA een-correde'd"O'
,XI !pUeficiencii6,6� b
x-
This certifies that this fire and life safety system has been properly tested in accordance with NPPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician Phone#: (206)622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) _ C-4v-%, cr-N Mcy-) (,v-( I Date �1 / I / I -J5--
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report C3
Sprinklers NFPA 25 Page 1 of 3
INKLER HEADS
1. The st5?tdafd_wrinkler heads are less than 50 years old or within a prescribed testing period.
If "No" have the h631� uIetested or replaced per 2008 NFPA 25 and at the prescribed Yes No 13
intervals thereafter.
Due date for sample testinq:
2. The Quick Response slirifikl'e'r�fieads are less than 20,y Id or within a
prescribed testing period
If "No" have the heads sample tested or Ireplaced per 200 Ar25 a7n, NIA 171. Yes C3 ;'No 'Ci
the prescribed intervals thereafter.
Due date for sample testing:
3. The dry type sprinkler head s than 10 yea�s old or within a
le test
sa ed c
mp
p c
rescribed testi
0 C3
If "No." e heads sample tested or replaced per 2008 NFPA 25 and at N/A C3 Yes Cl No 113
D scr t ry s t ft r.
t e prescribed intervals thereafter.
Due date for sbmDI6*tbstinq:
'hanGe_Qn: the system.gauges, is up -to ate.
,The'mainle -d
Due. date.for the next,�-� .Iesii
C 'th a calibrate gauge evei
Note: The -system gau
d ryjw
p9;.ed_wj
ace F,
yei" 173 i...No C3
'if a it i of th4--calibir ;99�rzuel*j Zefflqftr�
gauge is.no �6, ate
recalibirated. This ched s 11' 'e A io e floors at static, pressui e us n-
one calibrated,gau Alic calculations.
OBSTRUCTION INVESTIGATION
1 T h et��-_y_i i . v s I �Pi ati6h of Fire Department Connection (FDC) pip'in t,
Q IS UP-' 0-
clate.ihlaccordla I halp.,14. (effA0/21/2(!jgj_._,
'figation
.:Date. e nex0F io, I
'alLo�,
.'2. f67_4fi`p-,MQ�)1hcIuded 46sting7a_7M-oper '.,:No.,
vave'.1.
N
3. The 5-yeuLbsru-ction Examination of the sprinkler piping is up-to-date in accordance �Yes ��o 0
_auWrM8 NFPA 25 Chap. 14. (eff. 10/21/2012)
Date for next PiDina Obstruction Examination
DRY STANDPIPE
,.1,;
Standpipe,was,,hyqr&t4t iteked at riot less than 200 i-of 50 psi
Rs
�,Mhbfemaximym 16d N/A
No.C3
a6cess:ofm axi pressure is in e�cess,of
'2'-The
standpipb Fiee-D60bttmerMQ 66hection(s) is clear of bushe�,
'r,other
Yos�M
No 0
guards I debri� isyisibl6from the street
3.
All FDCs and hose valves have protective plugs or caps.
N/A C3
Yes
No C]
:4.
4�1.hiis�66W6`rn a FDC the pipin' was inspec e
"if a plug or cover w� 9. t
N/A,,,-
Yes*: 0'�
Jor..4 tki. cl)"��
e c
A. �jq
5.
All caps and plugs have at least 12" clearance for operating wrenches.
N/A 13
Yes
No C3
6..
All.swiveislurn freely.
N/A 0
Y s :
e
NoTl
FINAL CHECKS
"I.
Thb�.Firi_,Alarm i�'i�frernovedfrdii!46;st mode and/or otherpredautiona
.
d to'riiai0i4alarm:sys t N
measures were r em'ove E, em o norma
operation (includes,removalW Orotectiv6 coverings)..
2.
The system was left in service.
Yesr-d
No 13
If "No", why
..The confidence test rep6i�t was -given to*the -owner and a. current'status. tag was, Dosted..�-.'�,
Yes
No C3
4..
- The confidence test. report was sent, to the fire' marshal's office.
Ye S.
No C3
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
; k
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEM 5 YEAR TEST DRY r] WET 0 DRY STAN
71
�-Odcuppqpy Address: 336 Admiral.Way,, Edmonds* Occupancy Name: Port of Edmond�,�"`_,,.
-6hsible'Persor!
�k -Phone Number*
h s:,Ostbrriigh� 42&-,,�
J:Fi`�'st'& Last �Name: C 6
�:Re`spo'nsibl& Person 336,Adrhiral \Ai
a
Resp
SS
e, 'Addre
r6 ;�5!�.:Stat -zip gilsible P rty' .06st?
ss A"
-Edtp,§ E, M a i I
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
r
I LiQ�" a�kjt 0 Test Freq
Lie ncy:
Riser Valve Make: Riser Valve Model:
System Identification No. System Location:
(,q)r D_ 060k,
DEFICIENCIEs FOUND? Yes[] No
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
"
MI& cie'
PAKS�?` s�nave-,Ijeen_ :6
- "All: eC
it
rrect66l3v::,.. Date:
-
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action. A
Signature of Technician Phone #: (206) 622-4656
-7,
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature). MUIC-Y-t Date
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report C3
Sprinklers NFPA 25 Page 1 of 3
; i
SPRINKLER HEADS
1 . The'sisadard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "N6" have-ft-iieadis- sample tested or replaced per 2008 NFPA 25 and at the prescribed
intervals thereafter. Yoe-ff No 10
Due date for sample estin
2. 7he Quick Response sprinkler heads are less tha ears o�,Id,or.wit
..prescribed testing period.
or 'per NFPA 2 at N/A 0 Yes.0
If "No" have the heads sample tested or replaced,pe No C3.
the prescribed intervals thereafter.
for sample testing:
-Th' ead -Within a
e:dry.type sprinklqer�h es th6n''1,0. years. old �or
t
prescribed testin
if v� ss Ste
'No hav eads sample tested.or replaced per 2008 NFPA 25 and at N/A C3 Yes C3 No.0.1,
'1he pWS-cribed intervals thereafter.
f amDle te'stina:
�..-.:DU6 date or,s
I GAUGES
Th-e-m-aintenance on the system gauges is up-to�-daite...
Du
6 date f6r the n&-rmmpadsajLtest.-
d g
te
146tei' The.system gauges are C�11)111`11'11 FaTed-withzu:abiated gauge ever
to b
--`;-Years-;*.: If, a -gauge is not within4t; .39/6;�&-t ie ±czil�I�be�ated 0a
h Yes - 0;0(,.",� -,J
00 ta
.s.
00'ej
check should be dofi6.4 rs at-siati�'Pressqre uaL6g,
brie-calibirated -gauge and
INVESTIGATION
arZob-stm6tion-investigzation cff.irIe Departmjent'Connection (FD'C) piping is up7to'.
h .1
th -
5'C
'haip
With 20 .14,.',( 21/2012). Yes:
-investigation
r next: FDC obstruction
0 =nj�;ve:sti%iL
:`r
:h6. 6 -"krobstruction exam f
--2 �"_T -Y'ec 6 �Pp FQ.q included- stin
eiration of theS
haek--_
V�l ve
3. The 5-year Obstruction Examination of the sri ng is up-to-date in accordan6��_�-e.5
with 2008 NFPA 25 C . e . 1/2012) No 0
Date foLx*xH;1iaa EbstructEio�n�Examination
DRY STANDPIPE
St6hdpipe was hydrosta ically t sted dt'66t I 6ssthfaifi -200'�pi�§i 6r-50. psi im
t e
-e�cess o 150
access of. m aximum pressure where, maximum f
pressureAsin
N/A,
-Nob;
stanclpi�e' Fire'Depairtment Connectj6h(�) (FOC)'Js clearof bushek
N/A
Yes�t X
L. .,,,§qbMs.'.or:other debris and. is visible. fir m, th str
.0,
3.
All FDCs and hose valves have protective plugs or caps.
N/A
0
Yes
No C3
14..
7
if a -missing from a.rbtffi led
..plug or, cover was e-piping Was inspec.
N/A
Y 0
PS
';,N 0
require d
5.
All caps and plugs have at least 12" clearance for operating wrenches.
N/A
C3
Yes
No 0
'16' All swivei Is turn.freely:'.
N
173
e
y s
No'd.
FINAL CHECKS
The Fire A arm. was removed froni test� hiode,and)or. other;'Ore'Gautio' 6a'ry-
v4 m to,.norma! _4
�measures were r emov6 .-to"restor(*�-fitd.;aiarM.syste NIA
t f6tectiV6 coverings�.,
.opera ion (ihdude's ir`eim` oval of
2. The system was left in service.
"No",
Yes
No 13
If why
The confidence �testireport was given to the owner,and a current status tag was po§ted.
Yes.�o
No 0:
�-4.,',. Theconfidenc e test-rep6rt was,sent to,,the fife -marshal's*. office
Ye S.
No O.'.�
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
1 N CV
11�
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEM 5 YEAR TEST DRY 0 WET 0 DRY STANDPI
t0ccU0afiqy.-Addres&: :336 Admiral Way,.Edmonds
Oc'cupclpcy Name: Port of Edmonds
-:.RespohsiljleTer';§oh'*,
11a t- N' ffiow%'. th' r*
sq a is: Oster -man,
P ne, Wrnbb'rt.*?'�`�,-�. .425774 0549
Admiral W
spo'nsible eers'on-�- ay
d �Gik
:�G&I=Ssi 1�Edmo I hd s WA, 08020
R porisible Paity,�,.:
�'EWai A Costerman@oortofedmonds.org
ja
0 p
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
W
e
'61
enci
D� 6
biN
�e f IT! �T
? st.'
- , fikt:
Riser Valve Make: Riser Valve Model:
System Identification No. 1, F System Location: 5 �r
DEFICIENCIES FOUND? Yes 11 No A
List items that were not corrected at the time of the confidence test.
Use the Dericiencies section or attach itemized sheet
R FP I K 4 -igh�i�s`,h�ve be6n,correct6d;;0',`.:
E P ifie
.1 Pj;I,
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technicia
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) n Me n6r-( Date 44 / -1) / -.5—
Print Name and Title
Direct Phone # Email:
Building Rep unavailable C3 Building Rep declined to sign report 0
Sprinklers NFPA 25 Pa"ge 1 of 3
SPRINKLER HEADS
1 . The standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No" haVe-t4e_heads sample tested or replaced per 2008 NFPA 25 and at the prescribed Yes C3 No 11
intervals thereafter -
Due date for sample testing:
2. The Quick. Resp6ns.e,sprinkler heads ss than 20 years old i in a
Prescribed testih g,period.
C3 Yes C3
if "No" have.the heads sample tes.ted or >replaced B-NERI!� 5 and �aN/A No 13
the prescribed intervals thereafter.
Due date for samr)le testina:
The dry type sprinkler he
Ads-9-re less than 10 years old or within a
prescribed tes'�i�iod.
If "No" nd at N/A C3 Yes
.,bave"Me heads,sample, tested or replaced per 2008 NFPA 25 a
the piescrib,6d intervals thereafter.
Due d4te for..'saimple t6s,tidg:.
No 13
GAUGES
o A e sy -to-date.
n hi, Stem_gaudb�isuo
r
Due date 156, the, next,comp
No*te'-.'Thb:syitern gauge's are'to be compare d..g'p e eve ive.(5):.
years. If ai- gauge Is not rated gaug it'M '66d, 'or Yes 13 No 11
o o the calib
'Ufe so
re-
-chvER t
recalibrated. TbW should -be done' for multiple floors at, st I re
on nau e4qd'hVd`rauIIc calculatio
_q ns.
e,g,j�rafed,
I OBSTRUCTION INVESTIGATION
t
iping;q up:� o7
The, em-pbskurtioh investigationof Fire Department Connectioh;(E.Qq) �0'
�Wll
date id a6cord6h ffi-20,0&�NFPA 25 Chap. 14. (eff. 10/21/201'2)'�.'� y S_o--�No Co
y
6fo, 'kt,F
Dat r ne D. obstruct o,
mist
the chec
2,.; Th6 ��yeairbbstrdction exarbl6r.4he FDC s) include k
010:
iflg� -'Yes 0. N
3. The 5-year Obstruction Examina' rinkler piping is up-to-date in accora—am
4
P C
e_�-es_ 13 No 0
with 2008 NFPA �25Ch (eff. 110�/21/2012)
1� . I Q 0 struct i ti
Date for n in b Ion Exam na on
.q Obstruction Examination
DRY STANDPIPE
'tested
Si5nd h 0 50 psi in.-:,-�z
p e wa& Ydrost56,1k at n 't less than 2M'psror
6i 1 -'�"N A N 0
. access of maki u m`pr'�,�', 'IsAn e . x , c , ess Yes)q 0
essure where maximum pressure
2. -The standpipe Fire DepeirtMentCon6ection(s) (FDC) is clear of:.busho�
'171 No 0
es
deb is and"is'.,visible'from the street
3. All FDCs and hose valves have protective plugs or caps. N/A .0 Yes No 0
-�4.' -If a,plug
qr-cover was, missing rom a FDG the piping was inspected
-:_1 .1 . � I ., -Y
:4. N/A )..es, 0 No 0
d 'is'reauired)
f6r.' ebri§.* Tthis
5. All caps and plugs have at least 12" clearance for operating wrenches. N/A 0 Yes No 0
N/A Ye No 13:
.�6: All swivels turn freely.' S
FINAL CHECKS
1 the was removed from te �t a othpirprecauticipary-,
'Fire Ala�m s mode nd/or
measures,, W.ere, removedj*re�*rb fire alarm system to no.rMal.,-��N A, Yes 0:
No 0
v
operation. (includes removal of protective-cp erings).
2. The system was left in service. Yes
No 11
If "No", why
1' The'conficlenc'e:test report. was'given to the �owner and a current status,t6d was posted.
No 0
4- The confidence,test report was, sent to thefire marshal's. office* Y es'.
No C3 . -
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Viking Automatic Sprinkler Company
343.4 First Avenue South
Seattle, WA 98134 NFPA 25 Testing
2066224656
SPRINKLER SYSTEM 5 YEAR TEST- DRY 11 WET 13 DRY STANDPIPE
Address:
'7
Adrhi�6 monds Occu ancy Name:,
336 I',;W6y', Ed P
Port'o arrignia
,,,-..,qqupancy,
M*
Responsible Person'.
WN
41ast-Name:,
'h'h M I h q*b e: N Um" b er:
425
'Res bl' 'P '�-336---Ad
IQ- pqnsi q erson
'
IW
, A(, imira I V:Y
�� �� p�4 ep
�W '�4, �
�Z.
14 ress City, State,. Zi
IR-
.. M_"W �_ �. ": , - ..''
MQ
1M Wd **b,�.�,,,I,,�.,���,,.,�:!:.,,�,
"'bh-ds WA 2
E-Ma Addr6ssr
c Org."�
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
b9t :'o'f4est: ency.
Test, Fr6qui ZYT
Riser Valve Make: Riser Valve Model:
System Identification No. ep System Location:
DEFICIENCIEs FoUND? Yes[] NoA
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
r
4�4htPAIRS` efl6libncles ,have;bqtq1j �Correqx6dl '41
'All d
. . . . . . . . . . . .
.......... ......... .
te* E�.
d V: Y Date:
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action. Iq
Signature of Technician
Phone #: (206) 622-4656
Name of Testing Company�. Viking Automatic Sprinkler Company — Seaftle Washington
Building Representative (signature) Y-; c rl V& f I & r- C I Date 411-7/IS--
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report 13
Sprinklers NFPA 25 Page 1 of 3
I SPRINKLER HEADS
— I
1. The stanBlg�inkler heads are less than 50 years old or within a prescribed testing period.
If "W" have the he3ftsaQ2& tested or replaced per 2008 NFPA 25 and at the prescribed
intervals thereafter.
Due date for samr)le testina:
f::i,2 -of-
�_2. The Quick Response sprinkler- heads are less-tha ,Oyears-old within a
prescribed testing period. 0'�:F d N/A
i f "No" have the heads sample testedd ogr �reopl�per 20 18 N �P-,-264Q�A�Nh�
t
the prescribed intervals thereafter.:
DU6 date for sami)le'testinc'i'
The dry type sprink�l�er.hare less .'than O,ye6rs old or within a
t 0
prescribed testin iod.
v s
.:If. "No hav h d le ir N/A
eads sample testedc repiked, per 2008 NFPA 25 and, at
t the scrib int rvals therea
he,pr
.,prescribed intervals th * er.eafter..
-,',..,Due, date for sam pie festi
nq:
13 No 0
QA_UGES
"Th& ntena�nn4heLayste i�upito-date.`
m m-gauges
I D ue a
d' te fo� the nextcoin:p)6a—riisto-ht�est.;,:-'�-. -
Note- The system gauges,ar-etb; ecom al
p. r6d'Wn, ge every fl%�e (5).
ars. if a gauge is not*.w1t6ih'4Aw3%",of.t ed,gauge it mu ed -or. Ell
rig,
-�ghoul r multitile floors at stati ressure�us
recalibrated. This check P
6ne.6alibrated'qa�� -lid, I'
yd'rau calcu ation��..
OBSTR-UCTlQq_ INVESTIGATION
ucti -,fig nnection (FDC) piping is up-'to-
.t,.`,'The'5-year obstr on irivt atQn f Fi biD60artmeht Co
yy6r rM�
14�
eff.:10121/2012)
X�-,.-,�',�7�date in accordancewith'2004AFM
-obstructio nves iqa ion
.;:Uate:for next FDC nA t,
24:,jhe 5-y6ar obstruction 6kc�rii:,for,.thei�FD.C.(�)-.inctt9iod6d�:t6�tin �'�a
psi. r,
0
y
.A 13'*
3. The 5-year 0�b�s��Mination of the sprinkler piping is up-to-date in accordanc, No C3
__�qh� 1�'�s E�
wi 08-NFPA 25 Chap. 14. (eff. 10/21/2012)
Date for next PiDina Obstruction Examination
DRY STANDPIPE
i or 50 in
"5ta6dp ipe was hydros;tatid`6lly,,t66t 6at'not less, psi
b ss.of maximum �re Ore wher&maximum,p es ure,is -in excess of 5 01
ac e r
-
0',
psi,
J; A
LC66nb6ti6fi(s),,( PC 0 es
The standpipe Fire De0artmen F f bush
N/A
a:
No
or other debris and_ is vis-i6i'64r'onithe"We t
3. All FDCs and hose valves have protective plugs or caps.
N/A
0
Yes X
No 0
�47 7IN: lu o' cover was' r61s"C",ing f D. -,,the piping.was inspected,
_ip 9 r rorn
N X
=77:�-,777..
-(t is is rqq
fQ06bris: hi qLr
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
0
Yes
No 0
,6.-,,,, All, swivels turn freely.
N/A,.,;
_.7X7:77
es
N60
FINAL CHECKS
1.
Al ovdd 6 i�!:,tisli mode and/or other precautionary''
Th.eFire armwas:rem
�01 C."
measures were removed or' o , re fiiial�rm.�ystem to hormal, /A. -
ti,.� est N
Y s 4. '.N
o ation (includes removal of,'06qte6tiVi�bovenngs:
per;
2.
The system was left in service.
Yes No C3
If "No", why
e d6rifid6riceJest rep6rt4as aiven t& the oWner-aind-a current*status tag was oosted."
Yes -No:Cl
4'..
ThO:cOnfiden'ce t6stieport was--sieht.to, the fire,'matshal's: office.
e
-Y s A O�
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
.i
Kcgr
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEm 5 YEAR TEST DRY 13 WET 0 DRY STAN
1,06cdo6fidy,'Addresg: 336 Admiral Way, Edmonds. .0.!cduDancV.Name:,.Pqrt
of Edmonds
Resodh eTerson—
qZ
�Chris Osterman Rh6he,.Num be'r�
425 774-0549
33 &Adaiiral Way,
A 1, esp bi
'Edmonds WA 98020 PI)SI - tty�
P' tE�-Majl:Ad&d�s
.::.,Costerman@portofedmonds.org,
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
r 5 Year'
s.
jT
T
ON i 't
N
Riser Valve Make: Riser Valve Model:
System Identification No. - 1A System Location: Doc)k.,
DEFICIENCIES FoUND? Yes 13 No
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
cile t 4�
e b en correc e
04
cl a,
This certifies that this fire and life safety system has been properly tested in accordance with NFrA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature)_ ZrIc a rilcn e, K —Date hs—
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report 13
1
Sprinklers NFPA 2.5 Page I of 3
d
SPRINKLER HEADS
1 . The s andard sprinkler heads are less than 50 years old or within a prescribed testing period.
. ! �d sample tested or replaced per 2008 NFPA 25 and at th 4
If N6 have Mr e presgt
s Yes C3 No 0
intervals thereafter.
Due date for sampi testing:
2. The Quick.�`Res onse,sprinkler heads are less than- rs W&6r, Athi'
P _j , r-wi in a,
prescribed testing period.
'0 Yes 0 No C3 -
If "Noi'have,the heads samr)le tested or reDlaCed�Der2O6�8NFO�A25 an -aL N/A
the1,p'res'ciibed intervals thereafter.
Due' date for sample testinq:
-3 The dry type sprink1sbegas are less than 10 years old or within a
ib d t eriod.
prescri e, est
If '�'N o e heads.sample tested or replaced per 2008 NFPA 25 and at. N/A 0 Yes 13
r �cri�
escribed intervals thereafter.
Due:datefor sample testing:
GAUGES
T e m ipce_c�l
h fie sy§terii gauge's,is up-io-.date..
Due date:for the*noxt: compa st, . ... ..........
Noti:-TM s�ste'm. gauges aria to be compared wi [5)*
veryflVe I
e is not -within 3% ofthe calibr it mu 6&dr.. 'Yes C3 N6-.0
ge it mly
check should,be d 1606 floors at. stat bressureusn-
'�auqe-aad_hydrju-T1_c
on
e-,callibratedij calculations,
94�TRUCTIO N INVESTIGATION
,
'to,
fi �Jhe eari5iD.�gEg'dti6n.investigatidn;,of Fire D6partment. Connection -(FDC),pipihdjs':Up-
PA 25 C
P A 2 h a p., 14. (eff. .1,012
..,:date, in accordah6e wi hap 1/2012) Yes C3 .
(�effl 0�/�I,
�5C
'.'!,:'Datd'f6r next D 3, obstr=ction, investiq a ��4.'
stig
'b'" 606h exam for4he, FDC(s) included. iad�_or)eration,6 t he;chee
2,:'� The* 5.-.yearo 'stru- es
It �18 s _,q � �_ �-� - Y C1
:No
3. The 5-year Obstruction Examination of thle-spraRFEer piping is up-to-date in accordan 6�i'�75_0
with 2008 NFPA 25 Chap. 14 (eff-lV2-1/2012)
No 0
s ruction Examination
Date for next Pioz=
DRY STANDPIPE
tested at not less than 200 psi or,. 50" psi, in-,
66cess,o : f maximum pressur I e where maximum pressure is in excess of 150
.0
Yes X.
NO 1:3�::-.�`�..��
Z."Jhe
stand pipe-Fire'Department Connection(s).(Fpp) is clear of bushes
Yes
No C3
d oth`e;r�
debris and is visible from the street
Vi
3.
All FDCs and hose valves have protective plugs or caps.
N/A
0
Yes
No 173
4.
or cover w s missih the pi:ping.-was inspecte
a a g from a FDC
Yes 0..
iNo'13.
pt ris (t �L
5.
All caps and plugs have at least 12" clearance for operating wrenches.
N/A
13
Yes
No 0
.�6.
All swivels turn freely..:,
''N A
Yes
N
FINAL CHECKS
A..- 3hefire..'Allarth'w"as removed from test. mode and/or other precautionary.
:-measures w6re:removed to restore iire ila rn s�stem tonormal.':- Yes d
""'IN116b"�.;,
ope'rii6n,.(includes removal of protiec'thie.cove'rings).';' �I*
2. The system was left in service.
Yes
No 13
If "No", why
3. The confidence test report was given to the owner -and a,current status ta was,I56stecl.' Yes
Na C3
U
The confidence -test report was sent to the,fire niamhal' Yes
r
No C3
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEM 5 YEAR TEST DRY 0 WET 0 DRY STANDPIPE
�.Occupa'ncy� Address::':
336 Adrbira*l W6 '-'EdrTion&,'
y,,
N
Occupancy ame.
P. Edm hds
0
,,,Responsible'. n
P�r�o
"First .o�-Last'N6' 6:
hii6nvi
P h one Number-,.
'425 -7-74,,,',054
�.-:k6�oonsible'Pia��on�:-,,.----
6Admira, ay--,
I W
`A d t 'S ate.,
o, d, res� ti y� i�
A: 8020.,
Respbh�ibie Pa4"
E-WilAddrem
Si6 rm. !60�6nds.'b
Technician's Name: Daniel Lewis
Certification No. 4851-0312-EG
i, Date, S
Test
quen:.
Riser Valve Make:
Riser Valve Model:
System Identification No. L System Location: 6)
DEFICIENCIEs FOUND? Yes% No 13
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
di -el orroc e
,;,REPAIRS: All f,6i,6,n-ci6s"'h'a"v"b,pon�ip,'" "t dl�`13-
D t
�'Corre'dted' B a e�,
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company - Seattle Washington
Building Representative (signature) C r7 C rNe, V1( Date
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable 0 Building Rep declined to sign report 0
,el / -I / Is -
Sprinklers NFPA 25 Page 1 of 3
SPRINKLER HEADS
1 The standard sprinkler heads are less than 50 years old or within a prescribed testing period.
if 11 NolGve4w� ilaeads sample tested or replaced per 2008 NFPA 25 and at the prescribed Yes No 13
intervals thereafter. �__i
Due date for sample tesfin
2 �ears ol�d thin a
0 y or wiiandat �NIA� C3 Yes C3
r
12. 'The Quick Responses i are lels' No 13
prn 20 years old or within a
prescribed testing period.
If "No" have the heads sample tested or replaced per--20 2-5
'the prescribed intervals thereafter.
Due date for sample,te�sting:
The dry type sprinkler heat!97—aee, lest thah.1 0:years; old. or within a
�d t
E, eri;d.
prescrib �ril
I "-r -ads sample tested or replaced per. 2008 NFPA 25 and at N/A 13. No 13
f "N@ ave the he
the prescribed intervals thereafter.
Due date for sample t6sti6g:
GAUGES
-is�up'_to-:dqte
�:,,:,,The maintenance,on the -system -gauges
-Due cWte E�ne�t�6iii���is'o�h:tes't:"-�
-,..-Note: The -system' au PritOrl e,- �_ adih:zi calibriauge every fivigiiiii
ges ate
x1i
s a,gaugpi n o
'hin sH Mda-d-edor No.0
car .'If s t -wit -i 3 f,.*, t Iii 6. 61 i b i a t 6e �dgg a u cgi ��ei
,.t�req �rllefl C I
alillirated Th ---k should 166d - olors-at-s-Ta'r, 6ressu
foL
C v Wraulic
all aude��
caliD61ati6ri
OBSTRUCTION INVESTIGATION
X,�w iik-, '-j
he. &-year obstruction investigation of Fire''De'pa ment Connection (FDC) pipin, 1�*,u -to
9' 7
t
ch' 1 (e 2
d8 0
P.
0 S ruc
jj'�'Tdai ejn accordii witk'2008,,NFPA, 10/21/101 No C3—.-
Dati for -next.
u a.0 er
gl ii,
In
Yes
M No'. CV'
op
mex
&The. 5-year. obstrudtio` ani:-f6rthe,FDCj(9 d "p.
�va ve. M
3. The 5-year Obstruction E e sprinkler piping is up ice-----_
with 2008- Chap. 14. (eff. 10/21/2012) 13
Date for next Piping Obstruction Examination
DRY STANDPIPE
Standpipewas hydrostatii6allyjb'�t&d bt4id.169i�jh6ri'200. psi or 50 psi,in
access* of maximum, pife"'st u*ire is:in exidessoul 50.,-..'
�N'/A
es'll?
ON
pressure,iivh6r6�.ryilki4m-�'u'm":
7
psi
e e ,Connection(s)�(FDC)Js clear of bushes
_�`Th6 standpip 'Fire D'epari
-N/A
x
_0
gpards,.or other debris 66d is yisible from the street'
3. All FDCs and hose valves have protective plugs or caps.
N/A
(73
Yes
No 0
If a plug or cover was missing from a F.DC the piping was inspected -
N/A
)q
Yes .0
No 0-'
.�Jcir-clebris. (t is is
h rip-q'giri
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
13
Yes �111
No 13
6: All-wivels turn
s freialy.'.'
N/A
No 173
FINAL CHECKS
1`.1*.,7he Fire arm was rem
Al oved tr6m test mode arid/or other precautionary.,
to''normal.
removed� to restore fire Marini sy-stieimi N/A
No'cl
petaitl6n. (inclu, es removal o protective
d f coVi6rings).
2. The system was left in service.
"No",
Yes C3
Noo
If why ayur KA rv�s" lit,
The confidence, t6st're orfwas'igjven:toJhq own a' osted.
p nd.-a current status,tag'
No
The.confidence -test- report was sent to the fire marshal's office.
Yes
013
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Resolved C3
Location: e
5 Cr
Deficiency:
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
Resolved 11
Location: V
Deficiency: V %Isk=
Recommended Resolution: 1N C—
SFC and/or 2008 NFPA 25 reference:
Resolved C3
Location:
Deficiency: V,6A.\�C',
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
Resolved 13
Location:
Deficiency: )L
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
Resolved 0
Location:
Deficiency:
Recommended Resolution:
SFC and/or 2008 NFPA 25 reference:
Sprinklers NFPA 25 Page 3 of 3
V K INcr
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Tes,ting
SPRINKLER SYSTEM 5 YEAR TEST —DRY 0 WET 0 DRY STAN
ccypanq . y- Ad
:::0, dre's:
356Ad1miral,Waw-',Edmonds
Ot6upa �,Name-,
Port of Edmonds:-
e
P egdn.-
Chfis Osterman
Phone..Nu1mbV1:...
425.774-0549.
fisl"
6:Ad
.33 - mira ay��,-,
d s,,
-Edmonds'WA,98020
kies�`P� o n s'i 6 1W i;r�,
E��Mail Addi
Costermap@portof6dmon. sorg,-,
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
Riser Valve Make:
'e�st.' F rqqUp6 ar
c -Ye' f1l"
Riser Valve Model:
System Identification No. System Location: DOCA4N
DEFICIENCIES FoUND? Yes 11 No*
List items that were not corrected at the time of. the confidence test.
Use the Deficiencies section or attach itemized sheet
c&
nc ave,been
C rrect6 D
at
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician Phone #: (206) 622-4656
Name of Testing Comp /nyw:Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) _ T)-l' C r-S M-C 1,1 & r- d Date 4� / -111,5--
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report C3
Sprinklers NFPA 25 Page 1 of 3
LER HEADS
1 . '%.t,'standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No".have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed 6—�No 0
intervaf�-thereafter
Due date for sample testing--- -
2-, The Quick Response sprinkler A�e;ad;s1ifL!i-I an �20 within a
prescribed testing period.
S.
If "No" have the heads sample test replated per 2008 = -�ncl at NIA 0 Yes C3 No 0
s t r a r
the prescribed intervals the e r.
Due date for sample, ng:
The dry type 'ereheads are less than 10 years old or within a
Prescr 'r Pestpinag period,
-A-;o%"0h`a'-ve, the heads sample tested or replaced per 2008 NFPA 25 and at N/A 0 Yes C3 No C3
the Prescribed intervals,thereafter.
,Oqe date for sample,tesilng:
GAUGES
ie m4ifnitenanC6,66"'466, val tern gauges Is up,46
5 r
t M 4 n test
to b
Y!o N
)uId b 100
d
04& &hv W"',
IWO
J
2
-7
OBSTRUCTION INVESTIGATION
On 0 'e
FIRA 25 Cho
Yes.,01,
bstq)6tJo�,`1'0# 'the' FOC(s) I
jo�
lawM
3. The 5-year Obstruction Exam!'D e s
with 2008 NFPA 25 Chap-44. (eff. 10;;M
/21/20
(3 No 13
Date for nexW�4 ' bstruction Examination
DRY STANDPIPE
�A
,8x imum P
ire, e otion
rv�s
debr f rom the
the 6006
3. All FDCs and hose valves have protective plugs or caps. N/A
171
Yes
No C3
0,,p.ug,,orcv ie� wcli m, IW60' from a FDC,tb, was Inso,'00 ed,
,,plp
(thit i
Y
5. All caps and plugs have at least 12" clearance for operating wrenches. N/A
M
Yes A
No C3
""'AWsWivels turn freely,,!' N/A
FINAL CHECKS
2. The system was left in service.
If "No", why Yes No 0
P 7777=
n
-:'7
ence test, r6pqrt,was give
give ,to the 0,
'tot
h
e
T,
fid ce te$tr report was t,to the,,fire,Mbrs
Deficiencies
Sprinklers NFPA 25
Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEM 5 YEAR TEST DRY 13 WET 11 DRY STAN
6 d 6,! d
Admirbl--%i6y Edmo' Ec6 on s
''Rbso6risible.Person-,-�.
stermah Phone:,Number:' 425 774,0549,
�.�,First Last -Name: Chris'o
on —diiralMay -
Resp si e, arty
UE A'
il�-.'R'6 s-'lJobs i bi 6 -n
Rrg,
C' a'
h A E-Maial.*Ad&6�s . osterm n
,Edm*o,, sWx,98020 S
'9
i�16-fedrfio�di";'
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
06
e
.',,,.Test' 'u.
Riser Valve Make:
Riser Valve Model:
System Identification No. - System Location: 0 C-� K
DEFICIENCIEs FOUND? Yes 0 No
List items that were not corrected a(the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
t-EPAIRS.-.',�,,."JMI,..-'deficieficieg..-.have-,be'en-,corr'e'c'te"d,-,'�E,l'.�,-
A,
N1
N--,
71
D"
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Techn
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) _ -9r,' c Y-) N e 11% C- %,-C ( Date Z-1 /-7 / /,S--
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report 13
Sprinklers NFPA 25 Page 1 of 3
. . I SPRINKLER HEADS
1. The standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No" have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed Yes C3 No C]
intervals thereafter.
Due-d or sample testing:
Z"Jhe Quick Res inkler heads are less than 20 years old or within a":,
prescribed testing period.
'ested or replace �jO�NFP_A_25an at_�
"N " ka e e 8-N N/A 173, Yes C3 No C3
-If o v the heads �ample tested or replac FPA 25 and at
the prescrib led intervals thereafter.
Due.date.for sample testing:
:3."', The dry type,so.rinkler are less than 10 years old,or Within a
res cribed�190ipgPeriod
Jf "No24r��&-th.e heads sample tested or replaced per 2008,NFPA 25 and k�,-::,N/A: 0 Yes ��:No 0
'the prescribe ritervals thereafter.
d i
date' f6f,sample testin
9.
0R§jTRUCTION INVESTIGATION
-he 5 itiztion investigation of Fire D�epartment Connection (FDC) pipingis up4o;.��._
".,The 5-y ar- st
,-.da`te in abb6ij"' 25 Chi 14 (eff. 1,0/21 0 12) -
Ye
,Date f6r,:n6x'* C,
t,FD obstruction.investigat—io-M
,2.. 'WThje'5-y'e'_6r bbstru6tion dxairft fdrAhe FDC 8 iriclUded. te-s' ratZff.-6T;t_he-chec: -
;alve.
Yes 13
3. The 5-year 0�bstruction Exa of the sprinkler piping is up-to-date in accorda ����Yes�-
with 20081�NFP ap. 14. (e�ff.10/2-� 1/2012)
No 13
Date for - ext Piping Obstruction Examination
DRY STANDPIPE
P I
,R-!',St6ndpi0e,was: ydrostati(�611V,,t&st6datyfibt-16�s7thah�200,�,��i,,bf.�5a'�''n-
P h"
m m 150...
Yes
access of zi�' um'press'u'r'b where maximum pressure is.in excess of
'N/A...
'Psi.,
��Th6, standpioe Fire DeDartrent Co*nnection(s)'(FDC) is cleair-o bushes,
N/A
'd- 's
_77
Yes. No O�:.
,,_:,gqar. s, or other debris�an i yi.slb,lefror 1h street,
3. All FDCs and hose valves have protective plugs or caps.
N/A
C3
Yes
No 0
_:4_,._`*1f'a' p, lug�or cover was missing' rom a FDC,the piping-wasAnspected.
7
E, 0p4ris:--(this is require
A
Yes 0,
No I!:-.::
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
C3
Yes )b
No 0
:7—
��6." All swivels* turn fie e*ly.*'.;.
N/A
No 0:'
FINAL CHECKS
'I�-';,'Thia.Fird..Alarm',w'as.remo.ve'(J-ifrom te�t'nidd!6 and oroth ti ha
er�precau ior ry,
* , , , , , "* -
re a arm�system,to!normql
V�`, ,measures;.were:irerrioved.t6,,r6stcite.
eraticin;(in�Iddes'r6mov0l,6f,'Orotectivi§ co
-, _qP yerings .
2. The system was left in service.
"No",
Yes No C]
If why
i�;3_,.� i� ein be test repor I t was' e cu'r�6nt:§tatus ta4.vv'a"s:po'sted�:'*'��,',���,�:-
given to, the own rand a
Yes -No'o.
id
,.,!V,.The dont 6n6e, test. riaport,was.sent to the4ire marshal's office.
Yes, -No 171
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
KIN& Seattle, WA 98134 NFPA 25 Testing
V 206 6224656
SPRINKLER SYSTEm 5 YEAR TEST DRY 13 WET 71 DRY STANDPI
Occupancy Address: 336 Adm.iral Way, Edmonds Occupancy Name: Port of Edmonds.
-Responsible Person
First &Last N8fme:., Chris Osterman Phone Number. 4.25 774 0549
Responsibl&Pemon 336 AdmiralWay,
Responsible Party
Address, Qity, Zlatel Zi
Edftionds WA 98020 E—Mail Aadreiss Costiormah@portofedmonds.org
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
4
requency
6�0 � --.&f ,
Dat f T
_tF. 5 Year
Riser Valve Make:
Riser Valve Model:
System Identification No. GL System Location:
DEFICIENCIES FOUND? Yes[] No PK
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
IREN
01406ies-ha4e beieimc briected 0
Corrected Bv:
"�7
777777777-
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician ZIA & A - &! �—_ � -Phone#: (206) 622-4656
Name of Testing Company" Viking Automatic Sprinkler Company - Seattle Washington
Building Representative (sign ature) _�t- 1, t. 0 M eel 61 v-t I Date 4-1 /-r/ t5-
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable C3 Building Rep declined to sign report C3
Sprinklers NFP,A 25 Page 1 of 3
I I SPRINKLER HEADS
1. Th�tandard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "Nb" _R��the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed Yes 3,1�No Co
intervals therieafter,
Due date for sample te�s�..
,a a
2. The Quick Response sprinkler heads,ar n.20 years old ��a
rs 0'
prescri ' bed testing period.
)I t st 0 r O� C3
If "No" have the heads sample tested or rreep�l per 2008 and at NIA. 13 Yes
No. 13
u f er
the prescribed intervals thereafter.
-hple'testing-.-
Due date for sa
:.3.. The dry type sprihkler.�s are less than.1 0 years old or Within a
d
prescri e L�Wiffgperio
e Y N 0
If No"lay�.the heads sample ti sted or replaced per 2008 NFPA 25 and at N/A, [1 Yes. No* C3.
-thereafter.
the prescribed intervals
Due claiefor^sariiple testing:
,,b:AUGES
-g o-
The n1aintenzIric6'on the system auges is..up-4 clate�_
Due date for
aMc with a calibrated-c
;Note:- The.system -gauges are tq..Bb-co,*#p d %�6ge every, five
ypars.*:`0 ge'. ishotwithih,+/- Mofthe call ra e wiplaced or -Yes,.C].. No 0".
�agap
-recalib�aited..,-Thi�'check,!§hou d 66A e loors at's i essurF
ta6c,p�rj:s:s:ure
t I
lRd"c"a'11dula ions.
one.caiibratddfq�'a"u"'g'e*,- J.
OBSTRUCTION INVESTIGATION
i: The 51__yb"�!r ebzt'6.ction,inve� 6 .'(FDC)
V piping As,Up7tO-.`
�idati h of-Fird Department'Connectid'h:
F.
_.Aate in accorda 0*26t6 14.,'(eff., 1.0/21/201 2),�
D a e. or n6kt-FDC-_obsthicti6n in. v-estiq
t f a io
f h' h k
2:.,:Thb 5-y6ar'6bste6dtion,exdm,for the FDC(s) included testing Md-.ep:�L'
0-c � po Ye
s
No.
-�valve.'
4
Wam'
3. The 5-year Obstruction Exam . ation-oMe sprinkler piping is up-to-date in accordanc -es 173
with 2008 NIFPA 25-eh . 1 4jeff. 10/21/2012) Y No 13
Date forj3 ipin.q Obstruction Examination
DRY STANDPIPE
1-.'*1, Stai6dpip s y rostatically: tested no psi ofM.0sFM.,,
e Wa' at flesslh6n* 2*00.
d
access -of maxim um,!pressure where maxim um,pressureAs in excessl6f 1*50,`-;�,-,,N/A
C!
Yes
r
en
,_The " standpipe Fir.6lDbpartm t.C6nnetti6n(�)�(FDC).is-plear.of,bUsheis
NIA
C3
Y A",
e s
'6rds' or, othb bl'.f h' . s ree
sand-is� visi e rom-t 'Er' 6 t
3. All FDCs and hose valves have protective plugs or caps.
N/A
0
Yes J�
No 0
a r cover was missing.from afPC the piping was insoected
N
Yes��:d:
No,, Z
for i
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
C3
Yes
No C3
7,
6 All swiyelsJurn freely.,
N/A.
C3,:;..
Yes
0.
N 0',
FINAL CHECKS
A 46Alarm�' d m test rii6de and/or,pther precauti
was remove 4o' onary
r ved to restore fire allcirrn
Tpp��yres were. dmo
-
�removal,of
�,.'qoper.ati on (incl6c!6� prbt6cfive: do'Ver rigs)
2. The system was left in service.
Yes
No C3
If "No", why
"&�.-,The confidence test report wag 6n to:.thei. owner and a current st6tu�.tag was t d.
pp.s,'e
Ye S
:At'�-'4he -confidence. test'repbrt Was sent to the, fire-marshal.'s. office,
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134 NF I PA 25 Testing
2066224656
SPRINKLER SYSTEm 5 YEAR TEST DRY M WET 13 DRY STANDPIPE
Occupancy Address: 336.Admira'l Way, Edmonds Occupancy Name: Port of Edmonds
Responsible Person
First & Last Name: Chris Osterman Phone Number: 425 774 0549." .
,:Re§ponsible Person* 336 Admiral Way,
esponsible Party
A8dress,'City, State, Zip:. R
Edm6hds.WA..98020., E—Mail Address Coit6rman& ftofedmorid&org
PQ
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
est:
:.,Date of.T'
Test Frequency:, 5'Year
Riser Valve Make: Riser Valve Model:
System Identification No. - 19-1, System Location: CY.,
DEFICIENCIES FoUND? Yes 13 No"%
List items that were not corrected arthe time of the confidence test.
Use the Deficiencies section or attach itemized sheet
een do
REPAIRS: -All�d6fici6ncieifia'��V*6'6'�"*�""., ttdcted 0
Corrected By:.
Date.
7. -
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) j��44 6 n Mt n 4re Date
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable 13 Building Rep declined to sign report C3
Sprinklers.NFPA 25 Page 1 of 3
SPRINKLER HEADS
1. The standaed sprinkler heads are less than 50 years old or within a prescribed testing period.
If "NO" have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed
No (73
_F
Due date for samp e-fe—M2--
:2. �;The Quick -R&sponse sprinkler heads- —arler16saA4an 20 -years pid-dr-Wiff7ina
prescribed -testing period.
If. le n d:a NIA �11
h heads sample tested or r6 I
".No" have t' e d or rep, 6per 2008 �NFPP Yes' 13 No.0
ft
the prescribed intervals thereafte�r..
-for sample te
Due date sting:
-:3: The dry type sprink1sox-ATS are less than 10 years 'old or within.a
prescri bed testigglienod.
, " . I Ne h N P 2:,5 d at N/A C3 Yes -.0 No
f he ested or replaced per 2008 n �o C3
the prescribed intervals thereafter.
Due date.for samr)le testinq:
GAUGES
'to -date.
,#�W'-Th-e--m--anriteita4'Ge-Qo'-the �ystern gauges'
is up
bu'e':dat&(8 tke next com"li-o—n
par
5)
s are to be '�e;d d
Not6:,T*he*'sy'stem giuge comrpar�witigh��iac au Ive
year is not within +/- 30j�-,qf t ip. ca, .,rat I mus d.or
s.- if-ago,uge, h lib'^ Yes 10:�: C1.
'r 661ibrat&&This�checlk should Pressure u
q. 7
16,on
e dalibra4ed _qawe:an44i4ffrauIic':1ba'I'- I"
OBSTRUCTION INVESTIGATION
M the b gation. bf..'F, ire Departmdfit,Connectioh',*(FD 0—
. �(Q�,�truction,investi
da 6 2608 NFPA'2*�-`6
t6 imaccordai
e
obsttuctio
ate i6r:,ne�t� F0G+o
�21�,,T h6 5-�eaCobstruttion exam for the Fpqf)� indcluDdLid da���ck
. 0
N" 0'
alve
3. The 5-year Obstruction Exa of the sprinkler piping is up-to-date in ac-cbTd9RcP_.
with 2008 NFP ap. 14. (eff. 10/21/2012)
Ith
�Yes 11
No 0
D:J:i�e�xtPirpt)riun�trulc4 Examf
.q Obs�tion��i nation
DRY STANDPIPE
-0-
tan 6.'�Vzis'h�dro�taticall�rt6stedl- n60es,,ttHan 200. psi or 5 pstin...,
- -, '' - - .; ' '
S
'Y
c .
of,maximum, pre a?dn1um.lJ.r69gQreJs in excessW 150
ssure where'rn
N/X-, -
C3
rp . s
,01�1hb, standpipe nt Connbcti6n(s). (FIDC)'.'is,clear of bushes,
Fire Departme
'Visible
N/V
C3
guairds,� or other debris'and is from the street
3. All FDCs and hose valves have protective plugs or caps.
N/A
13
Yes
No 0
'4.: -�,Ifa_ pW,l-u, g1_6r"6pve'r w`_as,_.rnissiWn,g, fr*om* ._q_`-f_b&t6 in'sp_*e_6�f(e_d._'
N/X
Y, e
No 0
is 6d)
q
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
0
Yes'
No 13
7
w vels�Jurn fr I
:,All 's i ee V
N/A
. . es
'No
FINAL CHECKS
Fire Allarm was removed: from test m6de:andibr" other precautionary
)6sur4sowef6 remove&t6res rM. $ys
tore fireala te!*p','tq',norma1 NAJ:
'Yes�
0
_0 rat C U s remcival of protective.cover ngs .
0 iohi(in'l de .
2. The system was left in service.
Yes
No 11
If "No", why
The confidence test report was.given tothb bwnerand. a current status, tag was posted.
Yes:
No C3
The confidence test report was sent'to the fire, marshal's 'office....
No_C3_,
Deficiencies
Sprinklers NFPA 25
Page 2 of 3
V, KIN&
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEm 5 YEAR TEST DRY 13 WET 13 DRY STANDPIPE
Occupancy. AddregS." 336 Admiral d':*'
Way,'Edmonds" Occu an� 'N" Port of E monds
ame:.
-R&06hsib'Ie-'P6r'S'6'n`
er m' a b':- Phbh&�Num er---..1!.,::.3.i 425.77
S,-O§t' b 0549
-P� '7
336 Admir6lWay,
Q Ity" wte"-Z e�p9q.-Oep iy�,'�,7,
`�-,;Edm6nds!--WA 'C
-3
4WO
Wd 98020:,','�: osterrii6 &0�of6dmond
n
b
S t-"
Technician's Name: Daniel Lewis
Riser Valve Make:
Certification No. 4851-0312-EG
CVcr\
-�Ust+riaoUency-----
Riser Valve Model:
System Identification No.-5 System Location
DEFICIENCIES FOUND? Yes C3 No 9
List items that were not corrected at the time of the confidence test.
Use the Deficiencies section or attach itemized sheet
,� D OCK
"5?
4,
R E RA I R ';AJFddfidi16hcieis - haV6,Ibeen corrected.,,-.
i` bUN&O
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.'
Signature of Technic . ian
le
Phone #: (206) 622-4656
Name of Testing Company:
Viking
Automatic Sprinkler Company
— Seattle Washington
Building Representative (signature) Date
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable 13 Building Rep declined to sign report C3
Sprinklers NFPA 25 Page 1 of 3
SPRINKLER HEADS
1. The standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No" have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed
-- i7n-e-rv-a-rg-thereal,E� �._
Due date for sample te��2�
2. The Quick Response sprinkler, hieMs-are-less than 20 years old or within
prescribed testing period. it
If "No"'have the heads sample testead or replacedd ra(II-EPA 25 and at N/A 0
the prescribed intervals thereafter.
Due date for sample testing:.
3. The dry type sprinkler h�a less than 10 years old or within a
,prescribed testing_pe�bd.
If "No" haye�eads sample tested or replaced per 2008 NFPA 25 and at, N/A 13.
the prescribed intervals thereafter.
Due date for samole testinq:
The maintenance on the sys e t dat
Due date for the next,comparison test:
Note: The system gauges, are to, be'compare withacali go-exor f (5)
_y ive
years. If a gauge is.not within +/- 3% o a e gauge it m t be re
plaz"-Gr,
recal ibrated,. 1his check, ne for multiple floors at static pressure:using,
Yes C3 No 173
Yes 13 No 11
Yes �ONO 13
Yes 0-. NoO
OBg!IUCTION INVESTIGATION
1. The 5-yea—r-obstruclLon investigation, of Fire Department Connection (FDC),pipirfg ipmp-to-
__M PA-25 Chap. No C3
date in,accordance*with 8-NF 14. (eff. 10/21/2012)
Date for next FDC,bbstruction investigation
for the FDC(s) included testi�rf �opmoc&ofthecheck
Yes CI No 0
AW.
3. The 5-year O�bstruc mination of the sprinkler piping is up-to-date in accordance
t 00 No 0
with �2008 25 =hap. 14. (eff. 10/21/2012) Yes
r xt Pipi 0 structior
Da r next Piping Obstruction Examination
I DRY STANDPIPE
4.
,St�ihdpipe�A�ias'hydr6stbtically tested at not,less than 200 psi or 50 psi in.
...access of maximum pressu re where maximum pressure is in excess of 150
N/A
13
Yes
No C3
psi.
2.
Thestandpipe Fire Department Connection(s) (FDC) is clear of bushes,
N/A
0
Yes
No 0
guards, or other debris an.d is visible from the street,
3.
All FDCs and hose valves have protective plugs or caps.
N/A
0
Yes 39
No 173
4._�
-If a plug* or cover was missing from a. FDC the piping was inspected
N/A
Yes' 0
No 0.,
(this is,re_�uirdd).
5.
All caps and plugs have at least 12" clearance for operating wrenches.
N/A
13
Yes %6L
No 173
6i:.
All swivels turn freely.
N/A
C]
Yes
No C3
FINAL CHECKS
1.; Th6,Fir6 Allarmwas removed from test mode and/or other precautionary
I
'meqs`6rei,we r6removed t o I restore fire alarm syste I m to normal, N/A
Y4� No C3
operation (includes removal of protective covering$).
2. The system was left in service..
Yes No C3
If "No", why
3. The confidence test report was given to the owner and a current status tag was posted.
Yes No C3
4'.. The confidence test report was sent,to the fire marshal's office.
Yes No 0
Deficiencies
Sprinklers NFPA 25
Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
Seattle, WA 98134
2066224656
NFPA 25 Testing
SPRINKLER SYSTEM 5 YEAR TEST DRY 13 WET 0 DRY STAN
Occupancy Address: 3.36Ad Mira 1. Way, Edimon,�s . . Occupancy Name: Port of, Edmonds..-,
,�-Respohsible?erson -
N
b
ChHs`0std&nah um er:,.
-33&,
AdAieai way,
eispdnsibbe Oarty
Cosi 6a6@poqofedrnond , s.org"
-,E"Mall Address
p Edmdnds:WA.9802&,,�.'
Technician's Name: Daniel Lewis
Certification No.
4851-0312-EG
'of
5,',,;Y! P
�TO
rque
-Test;,F nc�
Riser Valve Make: Riser Valve Model:
SysterifIdentification No. - _T System Location:
DEFICIENCIEs FoUND? Yes 11 No 0
List items that were not corrected at the time of the confidence test
Use the Deficiencies section or attach itemized sheet
;�AEPAIRS: �A[defI606616s;f eewcorrectiad
�J:
a e
t
. 7
�7-
This certifies that this fire and life safety system has been properly tested in accordance with NFPA Standards.
T e discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician,
Phone #: (206) 622-4656
Name of Testing Company: Viking Automatic Sprinkler Company — Seattle Washington
Building Representative (signature) At ri e. r c I —Date ZVI 7115
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable 13 Building Rep declined to sign report C3
k.,;. _
Sprinklers NFPA 25 Page 1 of 3
�� I SPRINKLER HEADS
1 The standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No" have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed
irltervals thereafter.
Me-date4w_samele testing:
.2.�:-7h.e-Pulick Response—s-prirrWepheads are less� than I 20years, old -or -with'
prescribed testing period.
P
'if �"No" have the heads sample tested or reblaced.DdZ <NFPA25 and at N/A 0.
-the prescribed intervals thereafter.
DueAbte for sample te ting:
J3._* - The.dry typelspri�nk�IE are less than 10. years old or within' a
pr es cribq�g period.
JVA_o�-Wve the heads sample tested or replaced -per. 2008 NFPA 25 and at N/A 13
the prescribed intervals thereafter.
Due ? date'. fo r sample testin.q:
Yes-J3--'No 0
GAUGES
t
a
P.Qe_o�e sys em g�augesi,is.upA6.-
bde,&t:6 for., the next comparison teST;,17__7_'___.1.
k 6te f
h6l"system gauges are to�be q*omF'jdr,6dwj
es:. No; C3
"if, A`gauge is not wit 4.414Wta-fiffir e. Ila' C3.
ntati� pressure usin
0' rs, it
jh!��s
cali6ria'ieid.' ni =11dkii�'A
rated'qauge and hvdira6lieda`116611�tio` ns-.,:. -
OB41SUCTION INVESTIGATION
Depart
'yec avq§pgation- piping is UP40-,,
6— -The,,.5- airo s1ruMior+4 of, Fire, ment Connection'(FDC
14"
'Glua 3.,- 2)
with 2008 NFP
ovnext
D f FDC.obstruction investidbtio�-,
ate
f tK1
or. e�� L,; il c op a �q e c eq
T 6:5 1 :g) 9,1 ��ili fien f th h k
h �joa'r.bbstruction exam
'y
3. The 5-yea 0 c ion Examination of the sprinkler piping is up-to-date in accordance
wit��NFPA 25 Chap. 14. (eff. 10/21/2012) Yes 0 No C3
Aratp fnr nAyt Piping Obstruction Examination
DRY STANDPIPE
�,",I,t'�"StandpioO.was'hydrostatically test6d:at?hotj1less'than,200 psi.or 50 psi in
acpess ol maxim.um.pressure where maximum. pressure.(s in excess o f 150,
N/�
Yes
0,
Psi.,
-2. The es,
,w.� _standpipe Fire Department Conn6ctiori(s)_(FPC).is clear of bush
y
debris and is: visible Irom i6e'. s tr'eek'.�
3. All FDCs and hose valves have protective plugs or caps.
N/A
C3
Yes
No C3
74_._-_�1f'-a'0lu_g'or' cover was missing -from a was-,inspected�.
/A
j
Yes 0 No- 13"
-for debris..
-Jthis is'recliluired)'
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
C3
Yes
No C3
'6;" All �swiv*els'turn freely. �..,N/A
0
Y es
-.777-
"No 0,
FINAL CHECKS
:,J�' "The-Fireii Alarm was, removed from testmo.de and/or other, prqcautionar y
-measures were removed to re o q.fire'alarrn�system,to normal
st r N/A
Yes�, C3
'j
�:,,,operatidinh (inciludesi removal of protective*66verings)Z,
2. The system was left in service.
Yes "'A No 0
If "No", why
1� The confid6n'be t6st.reporfwas given.to:the owner and a current stdtus-t6g.Wbs.'bosted..-,,.��'-
Yes"
..A. :..The, 6onfidence,,test report was 'sent to the fire ma'rshal's.office.
Yes'. �NoO
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
Viking Automatic Sprinkler Company
3434 First Avenue South
KIN& Seattle, WA 98134 NFPA 25 Testing
2066224656
SPRINKLER SYSTEM 5 YEAR TEST- DRY C3 WET 13 DR'Y STANDPIPE
IT T-;�
I ay, 0 Port 0
336 Admira M'' Edmon,.s
'Address:-' fEdmonds.
Ppapcy-, ,Aame:
e erson
Respbn§ibI P
Chris,Ositbrman !,'Ph6h6 N.Un b 425.7-74.'0549'
"336 Admiral Way,*.
Respbritible'Person
i1N. , - � Kqspohsi0lp.�Fqrty:.
S Z
a,Addji6gs�i Costerm*and�oirt&edmon s.or
"M
": 'r It 11 d
E
Technician's Name: Daniel Lewis Certification No. 4851-0312-EG
"requency,,..
-17,
N
ODatftfi
Riser Valve Make: Riser Valve Model:
System" Identification No. System Location:
DEFICIENCIEs FOUND? Yes 173 No V
List items that were not corrected at %e time of the confidence test.
Use the Deficiencies section or attach itemized sheet
�,R'EP.AIRS:�,-,-Ali'ddfidi6fi6ids h ave.bee'rf66 6ie - I
,Cdif6dt6d By:
",.,,D t
a e:
This certifies that this fire and life safety system has been properly tested in accordance with NPPA Standards.
The discrepancies found are noted in the report and have been reported to the building Owner/Manager for
corrective action.
Signature of Technician
Phone #: (206) 622-4656
Name of Testing Compan': Viking Automatic Sprinkler Company — Seattle Washington
y
Building Representative (signature) 7�rlek? Merll(jel Date Z/ /7
Print Name and Title
Direct Phone #
Email:
Building Rep unavailable 13 Building Rep declined to sign report 0
Sprinklers NFPA 25 Page I.of 3
SPRINKLER HEADS
1 . The standard sprinkler heads are less than 50 years old or within a prescribed testing period.
If "No" have the heads sample tested or replaced per 2008 NFPA 25 and at the prescribed Yes�
intervals Ihereafter.
Due date-FU7-�5�1�ssting:
'2. The Quick Respoi.n,se:sprin s are less than afsTtff `®rvOthin ai
prescribed testing period
'If "No" h s or replaced per 00
ave the heads ample C3 Yes C3
the presc�ibed interva eafter.
e testing:
Due date for99FF==
3. The cl��e sprinkler heads are. less tha* n 10 years old or within a
prescribed testing period. �Yes
If "No" ha-ve the heads sample tested or replaced per 2008 NFP I A 25,and at: ..N/A '7,0
the prescribed intervals. th`6reafter.
D:' ' dai 46"
ue te Csamble testina:
No C3
No C3
No C3
GAUGES
Th*q_cQ'initbriancie on -the system gauges isup-toi-date.
:'buld.dat r e�
7�3
'Notb: Th e-i �system� gauge's are I o b
:j!!,d..i iqu eiev6ryfive
t i 6��
'of the calibrate g t cl I I ri" , d-pr .-Yes 0 N o 0
years.,- If a gaug in d ao6e�-!tjil�g rep.lacA
Is checks o b' done for multl�le f ors at. 'i,
-erecalfta h uld, e 101 s atidibr6ssure usInq77
'eand'hydraulic calculations.
I 0B9YQ1CTION INVESTIGATION
ti "ti -of Fir6'Department Co+nhe'c'tio'r*.'
_v
f!.s iga ion j,(FDCj1pjping is,up� o
NoCl+ �A
"in eff. 10/21/20
date" -25 Chap�'14.
a -heit `FDQ-6bttruc'tioin`
i6vestigation'
e eXam,for the FDC(s),� included t6stin c
.2 Th '5'_�
&161;c"O ch.e k'
Yes 13 No 0
:.,v
3. The 5-year Obstruction Exam' n �f the sprinkler piping is up-to-date in accordance
0
(eff 10
with 2008 >NFP 2&_ ap. 14. (eff. 10/21/2012) Yes 0 No 11
Date for n Pipinq Obstruction Exam ination
DRY STANDPIPE
than 200 psl� 014i.,50. 0
"si,
ac :cess,6f mum oressure where maximum pressure isin exce!
..Y s
e
No
"'ps
-2,�-7T[ie�stbbdOip6-Firb Department Coninedon(s)(FDC) is cl6ar-of,busWE
es..
"bri' N/A
Y es
No 0 .711-1
h
or ot e is i
sand vsi e m the street
3. All FDCs and hose valves have protective plugs or caps.
N/A
0
Yes
No C3
.4. If a plug or cover was mi�sihqfrom a FDC the pipingwas inspec e
( __ q41
!his is �q,
N/A
Yes C3
No 0:
5. All caps and plugs have at least 12" clearance for operating wrenches.
N/A
0
Yes
No 0
6. - All:�WiVels turn freely.
N /k
Ye
No 0
FINAL CHECKS
Aiarrn 'was remove j de ani
dfrom`iesfilrici Nor oth6r'6r6 ary
cautior
�s stem to n I N/A:-.,
Measures were removed to':66siorelire, larm. y orma
tYps.
No
eiratibn (includes removal protecti� S).
e,covering
2. The system was left in service.
If "No", why
Yes
No C3
3. �-,The confidence test report was give'rit6 'the owner and, a currentstatUs ta� was posted..
i.Yes
No C3
��he confidence,test report Was sent -to thefire marshal's office.. - -
C31.
.
_No.
Deficiencies
Sprinklers NFPA 25 Page 2 of 3
VIKING AUTOMATIC SPRINKLER COMPANY
1 3434 1 st Ave S
Seattle, WA 98134
206.622.4656
TRANSMITTAL
Apd123,2015
Edmonds Fire Department
121 51h Avenue North
Edmonds, WA 98020
Attn: Fire Prevention Unit
Project: Inspection Reports
DESCRIPTION ADDRESS
Port of Edmonds (114 systems, 5-Year Testing) 336 Admiral Way
Sincerely,
Mary Yesulaites
Inspection Coordinator
AAA Fire and Safety, Inc ................................. �����M�ENT 17�1�
3013 3d Ave. No. Confidence Testing ACCOUNT#
Seattle, WA. 98109 DATE
(800) .223-.3473 FIRE ALARM
Addres, �; 76*"' MrA4 (A*_ City EDMONDS Zip 98020
Occupied as Fori OT eamonds
Building Owner PORT hone # (425) 774-0549
W W
Address 170' City EDMO Zip 98020-7214
Date of Inspectio 03/04 /ffyoe f inspection Annual Tester's Name Mark Hagen
Control Panel - N ka Mode a SFD Certificate # SCP- H00040
No. of Initiating Circuits 1 No. of Signal Circuits 1 Battery Voltage
Battery Voltage under Load _ (signals operating) Charge Voltage
1 . Trouble signal with A/C power off
Na
2. System operates satisfactorily on standby power
Na
3. All auxiliary equipment operates (elevators, fans, dampers, etc.)
—Yes
4. All signals operate on A/C power
Yes
5. All notification appliances checked for proper operation
Yes
6. All circuits checked for electrical supervision
Na
7. Control panel checks per manufacturer's instructions
Na
8. Central station or remote connection
—Na
9. Name of monitoring company Acct#:
10. Key to Danel available
Type OF Equip
# of Units Tested
Satisfactory
# of Total Units
Bells, Horns, Chimes
Voice Alarm Speaker
Visual Alarm Devices
Trouble Indicators
Flow Switches
Supervisory Switches
Smoke Detectors
yp-cz
Heat Detectors
Manual Pull Stations
Ventilation Control Ops.
Central Station
Annunciators
Elevator Call Down
Fire and Smoke Damper
Phone Jacks
Door Unlocks (fail safe)
Door Release
Chemical elease
Other
Problems found: None
Corrections Made:
Date Corrected By:
THIS IS TO CERTIFY THAT THE FIRE ALARM SYSTEM HAS BEEN PROPERLY TESTED AN INSPECTED FOR RELIABILITY TO COVER THE
ITEMS LISTED IN THIS REPORTS
Signature: RAorL- W-annn Electrical License WonnnmKn1')r1
Serving Briet; Edthonds, at id 1 �9425 Meridian Ave S
Mounfldke'Terrace Everett, WA 98208
Phone (425) 551-1200
www.FireDistrictl.org Fax (425) 551-1272
FIRE PREVENTION
INSPECTION REPORT
0 EDMONDS
0 BRIER
0 MOUNTLAKE TERRACE
0 UNINCORPORATED
FREOUENCY
STATION & SHIF')
LOCATION:
326 Admiral Way 08020
Annual
17--C
BUSINESS NAME:
Parl. Of Ed mcInd-b (:)I I icc
PHONE: 4257714054 0
SCHEDULED Am 2014
II'
DATE DUE —
MAILING
LIFIR 1,. 428
ADDRESS:
33E Admiral Way, EdITxInds, WA 108020
BUSINESS OWNER:
yA*wq=@wIh
HOME PHONE: 112-q- �Ofa - -7,+g 0
S
EMERGENCY-1:
PurL CY bdawIndti
HOME PHONE: .42L774M540 e�
CURRENT
KEY ACCESS-2:
HOME PHONE:
CITY YES NO
BUSINESS
0
El
EMAIL:
LICENSE
PERSON CONTACTED:
INITIAL INSPECTION DATE
NAME OF INSPECTOR:
io-IRE SYS I LMS,:
FE in 113
�4
HAZARDS FOUND AND LOCATIONS / COMMUNICATIONS
2
2
3
3
4
4
5
5
6
6
7
7
I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
1st RE -INSPECTION
DATE DUE:
2nd RE -INSPECTION
DATE DUE:
1
EXTENSION
GRANTED TO:
FINAL RE -INSPECTION
DATE DUE:
VIOLATIONS
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
PERSON
CONTACTED:
I
INSPECTOR:
INSPECTOR:
INSPECTOR:
2
DATE:
DATE:
DATE:
3
VIOLATIONS
1 5
VIOLATIONS
1 5
PRE -CITATION
LETTER SENT
CITATION ISSUED
NUMBER:
4
2
6
2
6
DATE:
CODE
SECTION:
5
3
7 t
3
7
RETURN RECEIPT
RECEIVED
6
114
8
4
.8
DATE:
DISPOSITION:
7
LETTER NEEDED [] YES NO
LETTERNEEDED F] YES El NO
8
FIRE DEPARTMENT COPY
FIRE PREVENTION
Serving Briet,* Edtnon4�, and 12425 Meridian Ave S INSPECTION REPORT
0 EDMONDS
Mountlake Terrace Everett, WA 98208 El BRIER
Phone (425) 551-1200, 0 MOUNTLAKE TERRACE
Twww.FireDistrictl.org .1 Fax (425) 551-1272 [1 UNINCORPORATED
FREQUENCY STATION & SHIFT
LOCATION: 336 Admiral Wav Suite A 2SUD Annual I 17-C
PHONE: 4 257 7 4 9 8 7 4r: -.' SCHEDULED Aun 2014
BUSINESS NAME: lop DATE DUE
Pot 4- v-P
MAILING LIAR
ADDRESS: 33B Admiral Way, Suk A, Edimn&-, WA 0802C
BUSINESS OWNER: HOME PHONE:
EMERGENCY-1: Lif4��� HOME PHONE: 429TF-�U "'CURRENT YES NO
KEYACCESS-2: PoF_ HOME PHONE: CITY
4 7-C- 509 --7 4 Of 0 BUSINESS
EMAIL: LICENSE o o
PERSON CONTACTED: INITIAL INSPECTION DATE
NAME OF INSPECTOR:
Ir- I HE SYS I E ME: FE,1112
I okg
HAZARDS FOUND AND LOCATIONS COMMUNICATIONS
o
2
2
3
//z
3
771,
4
4
5
5
6
6
7
7
I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
lst RE -INSPECTION
DATE DUE,
2nd RE -INSPECTION
DATE DUE-
EXTENSION
GRANTEDTO:
FINAL RE -INSPECTION
DATE DUE-
VIOLATIONS
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
PERSON
CONTACTED:
I
INSPECTOR:
INSPECTOR:
INSPECTOR:
2
DATE:
DATE:
DATE:
3
VIOLATIONS
1 5
VIOLATIONS
1 5
PRE -CITATION
LETTER SENT
CITATION ISSUED
NUMBER:
4
2
6
2
6
DATE:
CODE
SECTION,
5
3
7 1
3
7
RETURN RECEIPT
RECEIVED
6
4
8
_
4
8
DATE,
DISPOSITION:
7
\. LETTER NEEDED [:] YES NO
LETTER NEEDED [-] YES NO
8
FIRE DEPARTMENT COPY
v(*
-=Emu,
w V_ ff— a— 0—
-7�
-A\PR 0 7 2014
CONFIOENCE TESTING
FIRE ALARM SYSTEM
TEST REPORT
NAME OF FACILITY
PHONE NO.
o
DATE INSP%ION
A/
ADDRESS
t9 /n , a L wn
CITY
'e4 om O"f,
STATE
ZIP
OCCUPIED AS
MONITORED BY
/I L Al M r- rn
ACCT#
ys- _(F9.0
TYPE OF TEST
MONTHLY EJ QUARTERLY JW SEMI ANNUAL El ANNUAL El ACCEPTE] I
PRO-COMM LICENCE
BATTERY VOLTAGE VOLTS
BATTERY UNDER VOLTS
IFULLLOAD v.
CHARGE CIRCUIT VOLTS
ITEM
YES
NO
N/A
ITEM
YES
NO
N/A
ITEM
YES
NO
N/A
TROUBLE AC OFF
CIRCUITS16HECKED
FOR SUPERVISION
SYSTEM WIRING CONFORMS
TO NFPA STANDARDS
SYSTEM OPERATES
ON STANDBY POWER
CONTROLPANELCHECKED
PER NFPA 91�6 INSf
'K - — ?kNEL_
EY TO P
AVAILABLE
SIGNALS OPERATE
ONACPOWER
AUXILIARY EQUIP.
OPERATES
OTHER
SIGNALS OPERATE
STANDBY POWER
OPERATING INSTRUCTIONS
AT PANEL
OTHER
EQUIPMENTTESTED
NO. OF UNITS
SATISFACTORY
NO. OF UNITS
SATISFACTORY
TYPE OF EQUIPMENT
IN BLDG.
TESTED
YES
I NO
I N/A
TYPE OF EQUIPMENT
IN BLDG.
TESTED
YES
NO
N/A
BELLS, HORNS, CHIMES,
VOICE ALARM, SPEAKE14S
ANNUNCIATORS
VISUAL ALARM DEVICES
ELEVATOR CALL DOWN
HEAT DETECTORS
DOOR RELEASE
SMOKE D ETECTORS
L(
FIRE & SMOKE DAMPERS
MANUAL PULL STATIONS
PHONEJACKS
SPRINKLER'
SUPERVISORY SWITCHES
AUTO DOOR UNLOCKS
(FAIL-SAFE)
SPRINKLER
FLOW SWITCHES
OTHER
2 -)�C(
2
CENTRAL STATION
VENTILATION CONTROLS
OPERATE
-OTHER
OTHER
PANEL AND MODEL
��rvT
OTHE R
SERVICE TECHNICIAN NOTES Fire Watch required, threat level 1 2 3 (see reverse for a threat level explaination)
xi.<m r f,::�euw-
THIS IS TO CERTIFY THAT THIS FIRE ALARM HAS BEEN PROPERLY TESTED AND INSPECTED FOR RELIABILITY
TO COVER ITEMS LISTED IN THIS REPORT, IS CONSISTENT WITH FIRE ALARM MAINTENANCE STANDARDS.
OWNER WAS INFORMED ABOUT ANY NEEDED REPAIRS OR DISCREPANCIES. NONE YES
OWNER OR FACILITY REPRESENTATIVE
DATE
TECHNICIAN
LICENSE NO.
-5 8 V'M
4SIGNATURE
Serving Brier, Edmonds
SNOHOMISH CO.
Mountlake Terrace,and
001,
F I R E �('011. 411 D)15
I the Town of Woodway
DIS'TR'N'Twww.FireDistrictl.or-a
LOCATION: 336 0 Way A� Edmonds 98020
BUSINESS NAME: Edmonds Yacht Sales
FIRE PREVENTION
INSPECTION REPORT
A—EDMONDS
0 BRIER
0 WOODWAY
0 MOUNTLAKE TERRACE
0 UNINCORPORATED
FREQUENCY STATION & SHIF'*'
Annual 17-13
SCHEDULED
DATE DUE � Aug
MAILING LIFIR 411
A�,. ADDRESS: 336 Admiral Way A,',
BUSINESS OWNER: HOME PHONE:
Email:
EMERGENCY-1: Liiinane, Group Corp- ROME-P E: 42577492 "CURRENT
KEY ACCESS-2: HOME PHONE: CITY YES NO
BUSINESS
LICENSE
PERSON CONTACTED: S(,,o77 (Ool) -713- _LIC INITIAL INSPECTION DATE
NAME OF INSPECTOR: j cr—T
FIRE SYSTEMS: FE o'!
12425 Meridian Ave S
Everett, WA 98208
Phone (425) 551-1200
Fax (425) 551-1272
PHONE: 4257748873,
HAZARDS FOUND AND LOCATIONS COMMUNICATIONS
2
2
3
3
4
4
5
5
6
6
7
7
I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
1st RE -INSPECTION
DATE DUE:
2nd RE -INSPECTION
DATE DUE:
EXTENSION
GRANTED TO:
FINAL RE -INSPECTION
DATE DUE:
VIOLATIONS
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
PERSON
CONTACTED:
I
INSPECTOR:
INSPECTOR:
INSPECTOR:
2
DATE:
DATE:
DATE:
3
VIOLATIONS
1 5
VIOLATIONS
1 5
PRE -CITATION
LETTER SENT
CITATION ISSUED
NUMBER:
4
2
6
2
6
DATE:
CODE
SECTION:
5
3
7
3
7
RETURN RECEIPT
RECEIVED
6
14
18
4
8
DATE:
DISPOSITION:
7
LETTER NEEDED [] YES No
LETTER NEEDED [3 YES El NO
8
FIRE DEPARTMENT COPY
(0MV6
T
Fire & Soafcelcy " Inc
rd A— M
3 C) 13 3 V 1::� ! 14
Seattle Wa 98109
206-284-1721
info@aaafire.com
/A01C,r#Q6M
- 2k3
!�9 h*x-6 Fire Depa-1-tment
C-onfirl,once —1 �st Report
Confidence Tesviing Officer
(fax)
Red Tag Hotline
HRE ALARM or"IYSTEP0
Ce.rtlfication Given
(One System per Report)
Fi
CONFIDE . NCE TEST REPAIRS FHITE
,I Occupancy Address: 32(o kvz,�4 \�i
Occupancy Name:
City, State, Zip
Responsible Perso'n
First & Last Name: Phone Number: q-zK----nq 65 c1q
Responsible Persori Responsible Party
Address, City, State, Zip: E-Mail Address
Date of. 1h.'spedow.,
Inspection
Quartierly [I (High-rise Only)
Frequency[Type-.
Annual,.-,*,
Testers Name
(PIea'sePri_nt):'
SFD-Cdrtification--
Number:
scp-
Central station.monitoring?
Monitoring Required?
Yes 171 N o-
Monitoring
lk
Yes 0 No
Company Name:
System Make: 1210
System Model':
\,3 P,\e �%C�04
S.,
ys em ocafion
li�,
Identification. Number:
PROBLEIVIs Fnu�!D, (If nr
UORRECTIONS MADE:
(if additional room is needed, r
Date Corrected: Corrected By:*.
@se add a separate sheet) Sr'D CertiflicaLlOn Number: SCP -
--------------
eC e -4
This certifies !hatthis fire and- life -safety -system has -bee. prop riyinsp , U fuoir felliabilitly, I -
Items listed in this report and is consistent -with Seattle Fire Depa'rtmu"ht Fire' Code stand'�rds', and that
discre"p,an6es a!re noted and have been reported to the building:Owne'r/Manager for corildcti�&'�a�cfion.
�Signature of Tester- Phone #
Testing Agency: ikkA Fire &_Sa el,�, Inc
Mailing Address.- 30133 d Ave N Seattle, Wa 98109
Building Representative (signature)
The'it6ms on'the checklists belo w''shall be inspected and tested. his lis-
I Ii L G'OeS I-iC-'L constitute all of the
required inrnprfir�g and teStinn of .1h-fire and S-f--" System. efe r to t � e s ea tt 1 e rN . . m
-Ly L Me ire uepaitment
Fire Code tor inspecting and testing requirements. L
Ali rm, System Functionality
1. Trouble signal with AC power off?
V \1 �A,
es 171 No C1
System opera es pro y' "ja_ v
_.p�r_l:'6n�6�ftery: backup? -Y
es.. 0
Battery voltage (no load) ts
�-L' BatAe*ry,'Vdlta'9e..(full; oad,)." fts
yo.ltls (signals operakrig)
volts
5. Charge circuit voltage
:6" S
_y5tem: operate's 0�oper.y�on' stanc by power?
Y.e�scj No.0
7. All signals operate on AC power?
Yes
8'. 'Numb-er, 'o'f*i"nit*ia'tin'�".�.ircLjjts' N 0. 0
9 - Number of signal circuits
10. Does. m n
al� i.sy'5Lem m'6et audibiky_�tp clards as accepted?
.-Yes N 0
11. All circuits checked for electrical supervision? 0,
:... 1. 1—- 1. - Yes No 0
au. i.iary.,eqqipmen, -s)?
- I .. '_ - - - - .1 - -C '
pera es ns, cla,mpe
12,- All X. Elevat6rs',J6
N/A Ye�' �r' No C]
13. Ventilation controls operate?
N/A Yes C] No'
k,
ey to:p+�ne a
Yes ce, No
15. Operating instructions at panel?
Yes No
t 6
n ica Ors� unctibil prbp�dy?
Yes�, -No'
I Remote Annunciator Panels function properly? N/..
1. 1 ..' i2'��4'.':." . . , *i.� 5. . ' A Yes 0 No
8 El6vatq,,�_aj-DoWn, ions p. op�ryj:
N/A J!j Yes: t��
19. Test record bosted at iDanel?
ies No 0
2,Q General ila'Iri'I'a o'
N/A
21. Was a signal reiceived at the Central Station monitoring company?
N/A Yes 0 No 0.
Sped
Y -9 _77
' Total
ota '
Total Number
r
Number
Devices
F U
of Units in
L
Units
n its
__�jystem
23. Bells, Horns; Chimes,
uil
Buildin
st
Tested
r
Test Results Acceptable
24. Voic I e. S.pea.-kers (Voice Clarity)
PI/
N A -
Yes El
No C1
2.5; SmokeDetectors.
NP
�.Yes
No
2 6. Heat Detectors
N/A
Yes 0
N o [i
2 7.. Dd�t: Detect o.rs:,..
NIA
Y e s
o
28. Sprinkler Flow Switches
N/A
Yes [I
No
9 Pririkl�e.:.Sqpervisbry-'S' h
Vjtc es
N/A
y
yes 11
No cj�
7)
J..0. V . i . sual Alarm DevicCles
N/A
17(
Yes 0
No [I
31.. fv.1anu.al:P!ull-Statibhs*
32. &WMVftt0'P 91Q. C
ji�
N/A
Yes 0-
No CI
NIA
C1
Yes
No C1
33. Beam Detectors
N/A
Yes 0
No CI
31. Automatic Door .. Unlocks
N/'4,
Yes 0
35. AutornaLic Door Rel�;
as.e .
N/A
Yes 0.
0
36. Fire Da*mpq:rs,:.every 4 yrs.
NIA
Yes C3
No
Communication ECIL]ipment
Total Number of
Units in Building
Total Number
Units Tested
37.. Phone Sets,.
Test
Results Acc-p-1-1-
N/A
Yes 0
No
38. Phone Jacks
NIA
Yes 71
No
39. Call -in Siantil
1\1 /A
I I ';-�
.
Updated 12/05/12 at 9:27 AM
EDMONDS CITY COUNCIL EXTENDED AGENDA
Please note that tlw Extended Agenda is subject to change.
DECEMBER 18, 2012 at 7:00 p.m.
City Council Meeting
� Consent: Employment Contract for Senior Executive Assistant to City Council Jana
Spellman
� Consent: Law Support Collective Bargaining Agreement.
� Continued Public Hearing on the Planning Board recommendation to approve the
2 Hours
Port of Edmonds request to incorporate the Port's Harbor Square Master Plan into
the City's Comprehensive Plan. The Harbor Square Master Plan envisions a mixed -
use transit -oriented development. The mixed -use nature of the Master Plan will
allow for retail, commercial, office and public uses, and residential housing. The
Master Plan could provide 340 to 358 residential units, 50,400 square feet of retail,
9,784 square feet of office, 123,410 square feet of recreational health club uses
(including tennis courts), 3.8 acres of public open space, and 1,091 spaces of off-street
parking. The Master Plan envisions buildings of varying heights, up to a maximum of
55 feet conceptually, buildings up to 35 feet are proposed for the SR-104/Dayton
Street intersection while buildings of 45 feet are proposed along Dayton Street (with
step -back provisions for portions above 35 feet). Five story buildings (up to 55 feet in
height) could be located toward the far southern edge of the site.
� Annual Report — City Attorney
15 Min.
� Yearend 2012 Budget Amendment
10 Min.
� Public Defender Contract
15 min.
� Prosecutor Contract
15 Min.
� Resolution of Intention to establish a BID stating the time and place of a public
10 Min.
hearing.
� Report on City Council Committee Meetings of December 11, 2012.
15 Min.
**DECEMBER 24 & 25, 2012 — Christmas Holidays**
NE'WYE*nD - 42M 0 130
**JANUARY 1, 2013 — New Year's Day / Hohday**
JANUARY 8, 2013
City Council Meeting followed by Committee Meetings
� Selection of Council President for 2013
5 Min.
� Selection of Council President Pro Tem for 2013
5 Min.
0 Committee appointments for 2013.
5 Min.
City Council Committee Meetings
0 Finance Committee
A. Monthly Financial Report.
10 Min.
B. Public comments (3-minute limit per person)
10
�3 3 G ae-�
) -2- J-1 ) 1 2—
New or Expanded Elements
of the Port of Edmonds
Master Plan
Harbor Square Redevelopment Plan
APRIL18,2012 Revised for Planning Board Review
August 29. 2012
INTRODUCTION
The Harbor Square Redevelopment Plan has been prepared as an amendment to the Port's Master
Plan. Its purpose is to provide a framework and solid foundation for the eventual redevelopment of
the 11 -acre site into an economically feasible, environmentally responsible, and well -designed
mixed -use transit -oriented development in the City's Downtown Waterfront District.
Harbor Square is an important component of the Port's overall property holdings and when
redeveloped will further the Port's statutory directive of "engaging in economic development
programs" to benefit constituents of the Port District as well as the overall Edmonds community.
The Harbor Square Redevelopment Plan provides important site planning and design principles to
be used for future development plans.
The preparation and adoption of the Plan is in the midst of a multi -phased planning process.
Completed, ongoing, and future phases include:
Phase 1 (complete)
Prepared a generalized fiscal impact analysis of site redevelopment scenarios.
Phase 2 (complete)
An extensive outreach program to define the community's preferred use, connections, and design
principles for the Harbor Square Redevelopment Plan.
Phase 3 (ongoing)
Port Commissioners will adopt the Redevelopment Plan into the Port Master Plan. Following Planning
Board public hearings and action by the Edmonds City Council the Redevelopment Plan, if
approved, will be incorporated into the City's Comprehensive Plan.
Phase 4 (Future)
Following approval of the Comprehensive Plan amendment by the Edmonds City Council, The Port
will market the project to solicit responsible development interests. With the selection of a
developer by the Port, negotiations between the Port and City will occur to address project issues
including rezoning of the site, site layout, design issues, impact mitigation and other site
development issues. Resolution of project issues will likely occur through the preparation and
approval of a rezone and/or development agreement involving the City, the Port and the selected
developer. Upon approval of the development agreement by the Edmonds City Council
construction documents will be prepared and submitted to the City for review and approval.
Implementation of the Harbor Square Redevelopment Plan is intended to occur over several years,
depending on the economic climate, existing lease arrangements and site planning considerations.
REDEVELOPMENT OBJECTIVES AND CONCEPT
The Port has identified opportunities to redevelop the Harbor Square site with a mix of residential,
office, and retail uses that promote economic development, environmental responsibility, and a high
quality design character. The redevelopment concept includes increased public access
opportunities and other amenities that capitalize on the site's waterfront setting and adjacency to
Edmonds Marsh. Public benefits include an expanded tax base, increased downtown activity,
enhanced connections between downtown and the waterfront, an improved pedestrian
environment, promotion of transit oriented development, improved ecology, and increased
waterfront view opportunities with public gathering places.
Consistency with Edmonds Comprehensive Plan
This Master Plan is consistent with the City of Edmonds Comprehensive Plan and pursues a number
of the Plan's goals and policies. Most of the Comprehensive Plan goals and policies relevant to
Harbor Square are located in the Waterfront Activity Center element. Below are some of the goals
and policies from that element that guide this master plan. Additionally, the Physical Design
Principles included in this Master Plan implement the design -specific Comprehensive Plan policies
which are listed in that section. Comprehensive Plan goals and policies are identified in "italics. "
Comprehensive Plan Goals
Promote downtown Edmonds as a setting for retail, office, entertainment and associated
businesses supported by nearby residents and the larger Edmonds community, and as a
destination for visitors from throughout the region.
Define the downtown commercial and retail core along streets having the strongest pedestrian
links and pedestrian -oriented design elements, while protecting downtown's identity.
Identify supporting arts and mixed use residential and office areas which support and complement
downtown retail use areas. Provide for a strong central retail core at residential uses in the area
surrounding this retail core area. Emphasize and plan for links between the retail core and these
supporting areas.
New or Expanded Elements of the Port of Edmonds Master Plan 2
Develop gatewaylentrance areas into downtown which serve complementary purposes (e.g.
convenience shopping, community activities).
0 Explore alternative development opportunities in the waterfront area, such as specifically
encouraging arts -related and arts -complementing uses.
Comprehensive Plan Policies
0 E 1. Ensure that the downtown waterfront area continues - and builds on - its function as a key
identity element for the Edmonds community.
E 5. Extend Downtown westward and connect it to the shoreline by encouraging mixed -use
development and pedestrian -oriented amenities and streetscape improvements, particularly along
Dayton and Main Streets. Development in this area should draw on historical design elements
found in the historic center of Edmonds to ensure an architectural tie throughout the Downtown
Area.
E 8. Improve and encourage economic development opportunities by providing space for local
businesses and cottage industries and undertaking supporting public improvement projects.
E 9. Enhance shoreline features to include a full spectrum of recreational activities, park settings,
natural features (such as the Edmonds Marsh), and marina facilities. Improve public access to the
shoreline and link waterfront features by establishing a continuous esplanade along the shoreline.
The esplanade will be constructed over time through public improvements and Shoreline Master
Program requi . rements placed on private development.
E 11. Encourage a more active and vital setting for new retail, office, entertainment and associated
businesses supported by nearby residents and the larger Edmonds community, downtown
commercial activity and visitors from throughout the region.
a E 12. Support a mix of uses downtown which includes a variety of housing, commercial, and
cultural activities.
The Comprehensive Plan identifies individual districts within Edmonds Waterfront. Harbor Square is
located in the "Downtown Master Plan District" and the Comprehensive Plan describes the intent for
this district as quoted below:
Downtown Master Plan. The properties between SR- 104 and the railroad, including Harbor Square,
the Edmonds Shopping Center (former Safeway site), and extending past the Commuter Rail
parking area up to Main Street. This area is appropriate for design -driven master planned
development which provides for a mix of uses and takes advantage of its strategic location between
the waterfront and downtown. The location of existing taller buildings on the waterfront, and the site's
situation at the bottom of "the Bowl,"could enable a design that provides for higher buildings
outside current view corridors. Any redevelopment in this area should be oriented to the street
fronts, and provide pedestrian -friendly walking areas, especially along Dayton and Main Streets.
Development design should also not ignore the railroad side of the properties, since this is an area
that provides a "first impression" of the city from railroad passengers and visitors to the waterfront.
Art work, landscaping, and modulated building design should be used throughout any
redevelopment project
New or Expanded Elements of the Port of Edmonds Master Plan
Planning Principles
The concept diagram on the next page illustrates the planning principles developed during Phase 2
of the planning process. The principles serve as design objectives and form the basis for the Plan
Elements.
The design intent as it relates to the uses, building character, circulation and parking, public
spaces, and sustainability is defined below.
N.
6 3
10
10
*."J
LEGEND
Pedestna oriented storefronts and
Vehicle access and parking activities n
Residential village . . . . . . . Primary pedestrian route
> Galway architectural elernent 5 0 a N a Attractive streeiscape edge
0 Village plaza
0 Mixed -use
Principles
1 . Create a pedestrian entry and visual gateway at the Highway 104 / Dayton Street intersection which is the key link to
downtown Edmonds.
2. Create an attractive street front along Highway 104.
3. Feature pedestrian -friendly facades and uses along Dayton Street W.
4. Establish a pedestrian -friendly esplanade with adjacent activities between the plaza (1) and the marsh.
5. Connect pedestrian walkways to linkages around the marsh.
6. Provide vehicular access into the site from Dayton Street W.
7. Provide direct pedestrian access to the marsh from Hwy 104.
8. Create a pedestrian focus such as a village green or plaza in the center of the redevelopment.
9. Locate residential development in the southeast portion of the site.
10. Locate parking near the western perimeter, next to the railroad, within a parking structure designed to serve the entire
redevelopment
11. Architectural character should emphasize a "Northwest Style" compatible with the rest of downtown and feature high quality
traditional materials and a variety of colors, forms, and textures.
12. Provide improved vegetation buffers to protect and enhance the Edmonds marsh.
13. Provide for a wel I- landscaped, Northwest -oriented, small town design theme.
New or Expanded Elements of the Port of Edmonds Master Plan
PLAN ELEMENTS
The Port will incorporate the following elements into the redevelopment of Harbor Square through
design guidelines or conditions of purchase/sale agreement(s).
Uses and Site Planning
a Create a "village" character with pedestrian gathering spaces.
a Create an attractive street front along SR104 as an entry into downtown, with a pedestrian and
visual "gateway" at the SIR 1 04/Dayton Street intersection.
0 Locate most of the residential development in the southeast corner and southern part of the
site in a village setting or well landscaped complex.
Introduce a mix of uses that complement downtown and that provide optimal tax revenue and
other benefits to the City and Port, including pedestrian oriented retail and a residential mix
geared toward a range of incomes.
Circulation, Traffic and Parking
Provide vehicular access from Dayton Street approximately midway between SR104 and the
railroad.
Locate most of the parking near the western perimeter of the site, next to the railroad.
Parking could be enclosed in an above ground structure designed to serve the entire site.
0 Keep interior streets narrow to slow traffic and put the emphasis on pedestrians.
Provide for bicycle circulation with shared use trails, bike lanes and/or safe shared lanes on
internal streets.
Public Amenities
Create a pedestrian entry plaza to Harbor Square that invites public use and provides a visual
gateway to Edmonds Marsh from the intersection at SR104/Dayton Street. Thispublicentry
point will serve as a key link to downtown Edmonds and also create a pedestrian focus such
as a village green or public plaza in the center of Harbor Square that provides space for
public activities such as concerts, performances, fairs or an outdoor market.
Establish a pedestrian friendly esplanade with compatible adjacent activities and building
facades that extends from the public plaza at the corner of SR 1 04/Dayton Street across
Harbor Square to Edmonds Marsh..
Create active sidewalk/pedestrian areas with retail spaces that open onto the Dayton Street W
sidewalk. Small scale pedestrian spaces should be integrated between the development
and the streetscape.
New or Expanded Elements of the Port of Edmonds Master Plan 5
Connect pedestrian walkways to linkages around Edmonds Marsh and to City-wide bike and
pedestrian routes. Orient development in a manner that connects Harbor Square to
downtown and the waterfront.
0 Provide direct pedestrian access to Edmonds Marsh from SR104.
Provide a civic/cultural/view point/interpretive element within the development as a public
benefit.
Include bicycle connections and facilities (e.g.: storage racks) in circulation and open space
planning.
with a Village scale
Flexible (retail/residential)
space on the ground floor
Visual connection from
Dayton/SR1 04 comer through
the site to the marsh
Y--- Internal site connection to the marsh
trail as well as the city wide trail system
Pedestrian oriented central esplanade with Low Impact
Development (LID) elements such as pervious
pavement, rain gardens, etc.
isite residents and Edmonds as a whole
Pedestrian friendly esplanade extending from public plaza at comer of SR104IDayton Street across Harbor Square to
Edmonds Marsh
Sustainability
Edmond's Comprehensive Plan includes a Community Sustainability Element with goals and poli-
cies to increase the city's sustainability based on three principles: flexibilityto adapt to changing
conditions, a holistic approach that integrates multiple actions to address the broad range of issues
and a long term perspective that extends beyond the typical 20 year GMA time frame. Among the
most relevant of this section's policies are: (See pages 19 through 26 in the 2010 Comprehensive
Plan)
New or Expanded Elements of the Port of Edmonds Master Plan 6
A.3 Integrate land use plans and implementation tools with transportation, housing, cultural and
recreational, and economic development planning so as to form a cohesive and
mutually -supporting whole.
BA Undertake a multi -modal approach to transportation planning that promotes an integrated system
of auto, transit, biking, walking and other forms of transportation designed to effectively support
mobility and access.
BA When undertaking transportation planning and service decisions, evaluate and encourage land
use patterns and policies that support a sustainable transportation system.
D.3 Explore and employ alternative systems and techniques, such as life -cycle cost analysis,
designed to maximize investments andlor reduce ongoing maintenance and facilities costs.
E4 Land use and regulatory schemes should be designed to encourage and support the ability of
local residents to work, shop, and obtain services locally
F2 Recreational opportunities and programming should be integrated holistically into the City's
infrastructure and planning process
G. 1 Land use and housing programs should be designed to provide for existing housing needs while
providing flexibility to adapt to evolving housing needs and choices.
G.2 Housing should be viewed as a community resource, providing opportunities for residents to
choose to stay in the community as their needs and resources evolve and change over time.
The Harbor Square Master Plan responds to these policies in several ways. The multi -functional
uses proposed for the site and the connections to downtown and the waterfront called for in Master
Plan's Planning Principles reflect the objectives of policies A.3 and EA. Proximity and connections to
bus, rail and ferry service respond to the transportation policies, especially B.1 and BA The Master
Plan provisions directly below include an emphasis on green building and green infrastructure solu-
tions as called for in Policy D.3 and the integrated pedestrian and bicycle scheme and supporting
principles as well as provision for the athletic club and the marsh boardwalk address Policy F.2's
call for integrated recreational opportunities. Finally, the Master Plan encourages a residential type
and setting unique in Edmonds. Below are additional provisions to Edmonds' sustainability objec-
tives.
Incorporate into individual buildings and the overall site redevelopment both low energy and
low water consumption techniques, as well as other strategies to minimize carbon footprint.
Employ alternative systems and techniques, such as life -cycle cost analysis, designed to
maximize investments and/or reduce ongoing maintenance and facilities costs
Provide improved natural vegetated buffers and building setbacks to protect and enhance
Edmonds Marsh.
New or Expanded Elements of the Port of Edmonds Master Plan
Incorporate low impact development (LID) elements, such as pervious pavements and rain
gardens to reduce undesirable run-off.
0 Contribute to day -lighting Willow Creek and improving the site's ecological value.
';--Landscape buffer between the
idewalk and traffic
Spaces for pe� astrian activity and gatherings and
retail spaces opening onto the sidewalk
Dayton Street sidewalk character
Physical Design Criteria
In order to direct the development of Harbor Square in an orderly manner to create a unified and
attractive complex, the Port of Edmonds will establish design standards or guidelines that direct the
design of individual buildings and spaces. The standards or guidelines will be used along with
other zoning code and municipal code regulations to review projects within Harbor Square. The
criteria are intended to be consistent with and implement the following goals and policies in
Edmonds Comprehensive Plan Downtown Waterfront Activity Center element:
New or Expanded Elements of the Port of Edmonds Master Plan 8
E 14. Encourage opportunities for new development and redevelopment which reinforce Edmonds'
attractive, small town pedestrian oriented character. Provide incentives to encourage adaptive
reuse as an alternative to redevelopment of historic structures in order to preserve these resources.
These historic structures are a key component of the small town character of Edmonds and its
economic viability. Height limits that reinforce and require pedestrian -scale development are an
important part of this quality of life, and should be implemented through zoning regulations and
design guidelines.
E 17 Provide pedestrian -oriented amenities for citizens and visitors throughout the downtown
waterfront area, including such things as:
• Weather protection,
• Street trees and flower baskets,
• Street furniture,
• Public art and art integrated into private developments,
• Pocket parks,
• Signage and other way -finding devices,
• Restrooms.
0 E 18. Strive for the elimination of overhead wires and poles whenever possible.
a E 19. Coordinate new building design with old structure restoration and renovation.
E20. Develop sign regulations that support the pedestrian character of downtown, encouraging
signage to assist in locating businesses and public and cultural facilities while discouraging
obtrusive and garish signage which detracts from downtown pedestrian and cultural amenities.
E21. Provide lighting for streets and public areas that is designed to promote comfort, security,
and aesthetic beauty.
E22. Building design should discourage automobile access and curb cuts that interfere with
pedestrian activity and break up the streetscape. Encourage the use of alley entrances and
courtyards to beautify the back alleys in the commercial and mixed use areas in the downtown
area.
The criteria described below present the general objectives and parameters that the standards or
guidelines will implement.
The physical design criteria for Harbor Square are necessarily general in nature because a specific
lay -out for the complex will depend on development considerations and opportunities at the time.
As noted above, they are intended to provide general guidance rather than serve as immutable
standards. See site development objectives the Uses and Site Planning, Circulation and Traffic,
and Public amenities sections.
Height and Bulk
Buildings should be no higher than 55' above grade except for 1) roof -top equipment and other
appurtenances that are not visible from ground level and do not block significant views, and 2)
special architectural features such as a tower, sculpture, etc.
New or Expanded Elements of the Port of Edmonds Master Plan
All structures above 35' in height should not diminish the "human scale" experience of pedestrians
on Dayton Street or decrease sunlight on the street. To that end, all buildings over 35'should be
set back at least 1' horizontally away from Dayton Street for every 1' in height above 35' above
grade. (This results in n significant additional sun shading or perception of a taller building by a
pedestrian on Dayton.) The schematic section below illustrates these relationships.
Buildings modulated and enhanced with
landscaping to provide pleasant
pedestrian promenade from 104th/Dayton
1-- _6 I -A
enhancements and boardwalk
per Edmonds SMP
Buildings along
All portions of buildings
Dayton Avenue no
(above 35'tall) set back
taller than 4
from Dayton St.
stories
sidewalk at least one
foot horizontally for
every one foot in height
above 367
I I Dayton
Pedestrian oriented St.
commercial activities on
ground floor along Dayton St.
SCHEMATIC SECTION THROUGH HARBOR SQUARE LOOKING WEST
Illustrating basic building height and setback requirements
Furthermore, the "average building height" of all buildings on the Harbor Square site, taken as a
whole shall not exceed 45'. The means of calculating "average building height" shall be as stated
in the notes at the end of this Master Plan.
Setbacks and Ecological Enhancements along Edmonds Marsh
All development within shoreline jurisdiction is subject to the provisions of Edmonds Shoreline
Master Program (SMP). Therefore, new buildings and development, including clearing, grading
parking areas, etc. will comply with the SMP. Additionally, the Port is committed to improving the
ecological health of the marsh and will ensure that new development along the marsh will increase
ecological functions. Envisioned improvements include: on -site storm water improvements per the
City's Storm Water Management regulations (which will improve water quality), vegetation plantings
(buffers), and a nature viewing boardwalk.
I
Small Scale Buildings
All buildings should employ horizontal and vertical articulation and other architectural methods to
maintain the small scale of Downtown Edmonds. Articulation means placing emphasis on
architectural elements such as windows, balconies, faqade modulation, rooflines, etc to visually
break down the fagade of a building into smaller pieces. Modulation is the stepping back or
projecting forward of portions of a building fagade as a means of breaking up the building's
apparent bulk.
New or Expanded Elements of the Port of Edmonds Master Plan 10
In general, the articulation should be designed to reduce the scale of buildings so that the horizontal
module is no greater than 60' in width. These preliminary dimensional provisions are intended to
respond to Downtown Edmonds' historic 60' lot pattern and traditional architecture.
Buildings over 35' in height should be horizontally articulated with upper story setbacks, different
materials or window patterns on different stories, balconies, canopies or other means.
Street Orientation
a Dayton Street Frontage
The ground floor of buildings fronting on Dayton Street should feature "pedestrian oriented
facades" and "pedestrian oriented uses". A "pedestrian oriented fagade" is one with
transparent windows or window displays along most of the fagade front, pedestrian weather
protection, signs oriented to the pedestrian rather than to the automobile passenger, a
prominent building entry and other amenities such as building details, lighting, street furniture,
etc. A "pedestrian oriented use" is a use that emphasizes human activity on the street such
as retail shops, eating and drinking establishments, personal services and service oriented
offices, etc.
Buildings fronting on Dayton Street should either front directly on the street or be separated by
a pedestrian oriented space such as a plaza, garden, outdoor seating area, etc. The
sidewalk should be at least 15'wide.
SR 104 Frontage
The site frontage along SR 104 should feature either pedestrian oriented facades or attractive
landscaping sufficient to screen the majority of building facades and all parking areas. There
should be a pedestrian path along the entire SR 104 frontage. If WSDOT is amenable, the Port
should enter into an agreement with WSDOT to improve the SR 104 ROW on the west side of
the roadway to provide a much better streetscape, development edge and entry into
downtown. Improvements should include street trees, landscaping, and if appropriate, a
shared use (bike/pedestrian) trail.
Architectural Character
Provide for a well landscaped, Northwest oriented, small-town development character.
Site Design and Landscaping
Use green space that relates to and complements the adjacent uses.
Use landscaping to create buffers between sidewalks and adjacent roadways.
Notes:
Average Building Height" shall be calculated by:
1. First, multiplying the foot print of each building on the Harbor Square site (as defined in the
Harbor Square Master Plan) times the height (as defined in Edmonds Zoning Code) of the
New or Expanded Elements of the Port of Edmonds Master Plan 11
respective building. (See conditions below for buildings with multiple heights) This calcu-
lation will yield the volume for each building.
2. Then, adding together the products calculated in step 1 (building volumes) and dividing that
sum by the sum of all building footprints on the Harbor Square site.
Provided that:
* Existing and proposed buildings will be included in the calculations
Where the height of a building varies from portion to another (e.g.: one wing of a building is 3
stories in height and another wing is 5 stories high.) then the building volume (height x foot-
print) of each building portion shall be calculated separately. The height of buildings with
pitched roofs shall be calculated as the average of the height of the ridge and the lower
eave.
For phased development where a portion of the site is developed, the maximum average
building height for an early phase may exceed 45'if the average height of all buildings on
site is less than 45'for all subsequent phases.
New or Expanded Elements of the Port of Edmonds Master Plan 12
�f ,
. ........
Serving Brier, Edmonds
-3NOHOMISH CO. I
n
FIREf Mountlake Terracea / d
.tJ'j the Town of Woodwa'
DISTiilti7 www-FireDistrict1lorg
LOCATIONf' 336 Admiral Way
BUSINESS NAME: Port Of Edmonds Office
MAILING 336 Admiral Wy
ADDRESS:
Edmonds
BUSINESS OWNER: Port Of Edmonds
EMERGENC�- 1 1 McChesney, Bob
KEY ACCESS-2: Kempf, Maria
PERSON CONTACTED: '/ I ur",
NAME OF INSPECTOR: L\,Pjz,,.p
FIRE -Fliq c(IM
SYSTEMS:
12425 Meridian Ave S
E-krett, WA 98208
Phone (425) 551-1200
Fax (425) 551-1272
PHONE: 4257740549
98020
HOME PHONE: 425774-0549
HOMEPHONE: 2067944259
HOMEPHONE: 2067137736
FIRE PREVENTION
INSPECTION REPORT
0 EDMONDS
OBRIER
OWOODWAY
0 MOUNTLAKE TERRACE
0 UNINCORPORATED.
FREQUENCY STATION & SHIFT**'
366 17 A
SCHEDULED
DATE DUE 1' 08/01112
UFIR � 591 8201
ACTIVE
CURRENT
CITY
YES NO
BUSINESS
0
oil
LICENSE
INITIAL INSPECTION DATE
-71t
FEJ02�
ANNUAL
HAZARDS FOUND AND LOCATIONS / COMMUNICATIONS
L
2 0)(:b nA 14 J,S 601 UYR,14 /
w/2 6?chln
2
F-CO I
JI
3 ju,
va n /L t'4_(
Pzwe� -V
3
4
4
5
5
6
6
7
7
I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X
1st RE -INSPECTION
2nd RE -INSPECTION
EXTENSION
FINAL RE -INSPECTION
VIOLATIONS
DATE DUE:
DATE DUE:
GRANTED TO:
DATE DUE:
CITED:
PERSON
PERSON
PERSON
CONTACTED:
CONTACTED:
CONTACTED:
1
INSPECTOR,
INSPECTOR-
INSPECTOR:
2
3
DATE:
DATE:
DATE:
VIOLATIONS
VIOLATIONS
PRE -CITATION
CITATION ISSUED
1 5
1 5
LETTER SENT
NUMBER:
4
CODE
5
2
6
2
6
DATE:
SECTION:
RETURN RECEIPT
6
3
7
3
7
RECEIVED
DISPOSITION:
4
18
4
18
DATE:
7
LETTER NEEDED E] YES El NO
LETTER NEEDED [] YES El NO
8
FIRE DEPARTMENT COPY
APPLICATION FOR PERMIT
FOR MATERIALS OR PROCESSES
January 3, 2012
Please verify and correct the following information:
Name of Company (DBA):
Port Of Edmonds Services
Edmonds Location :
336 Admiral Way
In conformity with the
-terms -of-the.International-
Fire Code, application is
hereby made to store use
Welding operation; storage and use of Class 1, 11, and
or maintain the following
III flammable and/or combustible liquids.
activity, storage or pro-
cesses:
c/o Port of Edmonds Services
Mailing Address:
336 Admiral Wy
Edmonds, WA 98020
EFD LIFIR #:
78259108B201
(for office use)
Your Signature
Your Name (print)
Your Title
Please make corrections, attach $40 payable to the City of Edmonds and mail to:
Fire Marshal
Department of Fire Prevention
121-5 th Avenue North
Edmonds, WA 98020
FOR OFFICE USE ONLY
Rec'd
0/( Z_
Check#
0
APPLICATION FOR PERMIT
FOR MATERIALS OR PROCESSES
January 24, 2011
Please verify and correct the following information:
Name of Company; DBA
Port Of Edmonds Services
Edmonds Location
336 Admiral Way
In conformity with the terms of
Welding operation; storage and use of Class 1, 11, and III
the International Fire Code,
flammable and/or combustible liquids.
application is hereby made to
store, use or maintain the
following activity, storage or
processes:
Mailing Address:
Port of Edmonds Services
336 Admiral Wy
Edmonds WA 98020
EFD UFIR #:
7825910813201
(for office use)
Your Signature
Your Name (print)
—P,&At
P
prr
Your Title
Please make corrections and mail to:
Fire Marshal
Department of Fire Prevention
121-5 th Avenue North
Edmonds, WA 98020
6" P"rl �
CITY OF EDMONDS
DEPARTMENT OF FIRE PREVENTION
PERMIT
January 1, 2011 782-5911-0813-2011 December 31, 2011
Date of Issue UFIR Number Date of Expiration
This PERMIT is issued to: I Port Of Edmonds Services
I located at: 1336 Admiral Way I Edmonds, WA
I To engage in the business, occupation or process of: I I
And shall constitute permission to maintain, store, use or handle materials or to conduct
process which produce conditions hazardous to life or property or to install equipment used in
connection with such activities as follows:
Welding operation; storage and use of Class 1, 11, and III flammable and/or combustible
liquids.
I Allowed Occupant Load: I -- I
Pursuant to the provisions of the International Fire Code, any violation of the Code may be
grounds for the revocation of this PERMIT.
This permit does not take the place of any
license required by law and is not
transferable. Any change in the use or
occupancy of premises shall require a new
permit.
Fire Karshal
Department of Fire Orevention
This Permit Must Be Posted At All Times in The Premises Identified Above
City of Edmonds Community Development Code 19.25.020
3013 3i&AVE- NORTH
StAl.-ME �WA FM DEPARTMENT
98109
Confidence les4ng.
(800) - 223, FIRE,
(�06) 24-1769 FAX
AAA RRE COM FIRE ALARM
Address City:
Occ'upiedas:
INVOICE #
ACCOUNT # �09CQ /a
DATE 3 -to 20 k�
Zip Code C, ?6D_0
Building Owner: Ph.#
Address: S-1-1 "e— - City: Zip Code: C�
Date of Inspection: 0 -ZC)q _ Type of Inspection: Quarterly C-An—nuiar—) Acceptance . Other
Tester's Name (PLEASE PRINT) SFD Certification # R-(.)(�,w4z�,
Control Panel L?o �)- kt� 6 0 1 S0,VC OM Model #
No. of Initiating Circuits No. of Signal Circuits
Battery Voltage Volts Charge Circuit Voltage Volts
Battery Voltage Under Full Load _1_____,V_olts (signals operating) 120 o . 1-\ - (:I- ,
I . Trouble Signal With A/C Power Off
Yes No
N/A
2. System Operates Satisfactorily on Standby Power
Yes No
N/A
3. All auxiliary equipment operates4=elevatars, fans, dampers)
Yes No
N/A
4. All Signals Operate On AC Power
5. Have All Alarm Notification
Yes No
Appliances been checked for proper operation
Yes No
6. All Circuits Checked For Electrical Supervision
Yes No
N/A
7. Control panel checks made per manufacturer's instructions
Yes No
N/A
8. Central station or remote connection
Yes No
N/A
Name of monitoring company
9. Key to panel available
Yes No
N/A X_-
TYPE OF EQUIPMENT
# OF UNITS TESTED
SATISFACTORY
# OF UNITS IN BLDG
YES
NO
N/A
BELLS, HORNS, CHIMES
VOICE ALARM SPEAKERS
VISUAL ALARM DEVICES
TROUBLE INDICATORS
SUPER SWITCHES (AUTO SPR.)
SMOKE DETECTORS(S)
HEAT DETECTOR(S)
MANUAL PULL STATIONS
VENTILATION CONTROLS OPERATE
CENTRAL STATION
ANNUNCIATORS
ELEVATOR CALL DOWN
FIRE DAMPER/SMOKE DAMPERS
PHONE JACKS
AUTO, DOOR UNLOCKS (FAIL SAFE)
AUTO, DOOR RELEASE
OTHER
PROBLEMS FOUND:
CORRECTIONS MADE:
Date corrected
By
THIS IS TO CERTIFY THAT THE FIRE ALARM SYSTEM HAS BEEN PROPERLY TESTED AND INSPECTED FOR RELIABILITY TO COVER
THE ITEMS LISTED IN THIS REPORT -
SIGNATURE OF TESTER ELECTRICAL LICENSE #
3
e� X
CITY -OF EDMONDS
121.5TH AVENUE N. - EDMONDS, WASHINGTON 98020 - (425) 771-0215
FIRE DEPARTMENT
FIRE PREVENTION
SAFETY SURVEY
LOCATION: 336 Admiral Way
BUSINESS NAME: Port Of Edmonds Office PHONE: 4257740549
MAILING 336 Admiral Wy
FREQUENCY S1A`rION & SHIFT
2 1 17 C
SCHEDULED
DATE DUE 11- 08/01/10
UFIR I� 591 8201
ADDRESS: \1
Edmonds 98020
BUSINESS OWNER: Port Of Edmonds HOME PHONE: 4257740549 AC*nVE
EMERGENCY-1: HOME PHONE: 75 q - -0y 5
KEY ACCESS-2: Kempf, Maria HOMEPHONE: 2067137736
PERSON CONTACTED: INITIAL INSPECTION DATE
NAME OF INSPECTOR: wmj< �-G N -_
FIRE FE,��J 0;;�
SYSTEMS: ANNUAL
HAZARDS FOUND AND LOCATIONS COMMUNICATIONS
1 7
7
ENTER CODE ONLY ONCE 0
VIOLATION CODE
2
2
3
3
4
4
5
5
6
6
7
7
8
8
'Ist REANSPEPTION
DATEDUE�
2nd RE -INSPECTION
DATE DUE:
EXTENSION
GRANTED TO:
FINAL RE -INSPECTION
DATE DUE:
VIOLATIONS
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
I v/
PERSON
CONTACTED:
1
INSPECTOR:
INSPECTOR:
INSPECTOR:
2
DATE:
DATE:
DATE:
3
NS-
1 5
VIOLATIONS
5
PRE-CITAIION
LETTER SENT
CITATION ISSUED
NUMBER:
4
2
6
DATE:
CODE
SECTION:
5
3
7
RETURN RECEIPT
RECEIVED
6
7
4
8
4
18
1 DATE:
DISPOSITION:
LETTER NEEDED 0 YES C] NO
LETTER NEEDED 0 YE.S NO
-FIRE DEPARTMENT COPY
CITY OF EDMONDS
121,5TH AVENUE N. - EDMONDS, WASHINGTON 98020 (425) 771-0215
FIRE DEPARTMENT
4�' t
LOCATION: 336 Admiral Way
BUSINESS NAME: Edmonds Yacht Sales
MAILING 300 Admiral Wy #A'
A
FIRE PREVENTION
SAFETY SURVEY
PHONE: 4257748878
ADDRESS: Edmonds 98020
BUSINESS OWNER: Linnane Group Corp. HOMEPHONE: 4257743259
EMERGENCY-1: Linnane, Ronne HOME PHONE: 42-57743259
KEY ACCESS-2: Linnane, Scoff HOMEPHONE: 2067132035
FREQUENCY
STATION & SHIFT
365
17 C
SCHEDULED
11' 08/01/10
DATE DUE
UFIR 1, 576
8201
ACTIVE
PERSON CONTACTED: IL 0 (-1 rj Ir'7 INITIAL INS ECTION DATE
NAME OF INSPECTOR: a-.o
FIRE
SYSTEMS:
FE _Lj_t 0
ANNUAL
HAZARDS FOUND AND LOCATIONS / COMMUNICATIONS
1 V4')Ty� tj b, 1pw r4 0
ENTER CODE ONLY ONCE
VIOLATION CODE
2
2
3
3
4
4
5
5
6
6
7
7
8
8
1st RE -INSPECTION
DATE DUE:
2nd RE -INSPECTION
PATE DUE:
EX'TENSION
GRANTED TO:
FINAL RE -INSPECTION
DATE DUE:
VIOLATIONS
CITED:
PERSON
CONTACTED:
PERSON
CONTACTED:
PERSON
CONTACTED:
I
INSPECTOR:
INSPECTOR:
INSPECTOR:
2
DATE�
DATE.
DATE:
3
VIOLATIONS
1 5
VIOLATIONS
1 5
PRE -CITATION
LETTER SENT
CITATION ISSUED
NUMBER:
4
2
6
2
6
DATE:
CODE
SECTION:
5
3
7
3
7
RETURN RECEIPT
RECEIVED
6
7
4 .18
4
8
DATE:
DISPOSITION:
8
LETTER NEEDED [] YES NO
LETTER NEEDED [] YES NO
FIRE DEPARTMENT COPY
e-
1:5-(L-C7
March 26, 2010
.'Date of Issue
N/A -
LIFIR Number_,::,",.
This PERMITJs issued to: I Mr. Kyusuk Kim
CITY OF EDMONDS
FIRE DEPARTMENT
PERMIT
April 26, 2010
Date of Expiration
Ilocatedat. 1336 Admiral Way Port of Edmodds R&0airYardjF. I Edmonds, WA
To enqa-qe in the business, occupation or process of:�' I HOT WORK OPERATIONS
And shall constitute permission to maintain, store, use or handle materials or to conduct
process which . .,produce conditions hazardous to life or property or to install equipment used in
connection with such activities as follows:
1) Work shall comply with IFC Chapter 26 Welding a ' nd other Hot Work (attached)
2) Fire Extinguisher sized 2A:20B:C to be onsitelwithin 30' of hot work.
3) Fire Watch Required.
4) Observe (attached) Gen'l and Fire Safety Requirements (Secs. 2603 & 2604).
Allowed Occupant Load: N
Pursuant to the provisions of the International Fire Code, any violation of the Code may be
grounds for the revocation of this PERMIT.
Thi&permit does not take the place of any
license required by law and is not
transferable. Any change in the use or
occu . pancy of premises shall require a new
permit.
This Permit Must Be Posted At All Times in The Premises Mentionec
Above
City of Edmonds Community Development Code 19.25.020
cd ry\ 6yos
AAX Fire & Safpty, Inc 940ffe Fire Department
3 133r. -Ave, U Confidence Test Report _0 q
a
Se 'ttle, a 981.09 -9-86-386-t448 Confidence Testing Officer
206-284-1721 l000's�
,t6--6r5--M68 (fax)
info@aaafire.com �--��ecl Tag Hotline
FIRE ALARM SYSTEM
Certification Given
(One System per Report)
..YELLOW 0
WHITE
CONFIDENCETEST
REPAIRS
Occupancy Addres.s: UcA_,,
Occupancy Name: �6
City, State, Zip C.'3C't_--10
Responsible Person
First & Last Name: �Olo kfCCL!jA_A_
Phone Number: Lt -2C-- -7
U
Responsible Person
Address, City, State, Zip:
Responsible Party
E—Mail Address
Date of Inspection:
Inspection Quarterly M (High-rise Only)
Frequency[Type: Annual
Testers Name
(Please Print): a4'-c k
SFID Certification
Number: SCP-
Central station monitoring? Yes 171 No 17
Monitoring
Monitoring Required? Yes D..' Nop
Company Name:
System Make: S- F-0 �-V_ 4-*
System Model:
System Location q�.O'o"
Identification Number:
FoLIND.: (if z,,(,Idi,;or.al roorr i'z needed, please e
CORRECTIONS MADE: Date Corrected:
Corrected By:
(if additional room is needed, please add a separate sheet) SFD Certification Number: SCP -
This certifies that this fire and life safety system has been properly inspected for reliability to cover the
Items listed in this report and is consistent with Seattle Fire
Department Fire Code standards, and that
discrepancies are noted and have been reported to the building
Owner/Manager for cor'rective action.
Signature of Tester:
Phone# 2o'L J S
Testing Agency: AAA Fire & Safety, Inc
rd
Mailing Address: 3013 3 , Ave N Seattle, Wa 98109
Building Representative (signature) _
M Al- 0+___
The items on the checklists below shall be inspected and tested. This list does not constitute all of the
required inspecting and testing of the fire and life safety system. Refer to the Seattle Fire Depar-tment
Fire Code for inspecting and testing requirements.
Alarm System Functionality..
1. Trouble signal with AC power off?
Yes 173
No 0
2., Systern'operates p. pc
ro �rl� on battery backup?"
Y,
Yes. 11.
.No 173
31. ...Battery voltage (no load) 'o Its
Battery vo
voltageffull load) V, lts.(,S.ign Is.opera6'n")
g
5. Charge circuit voltage volts
v
System.ope* rates properly on standby power?
Yes, 11,
NOIM'.:�
7. All signals operate on AC power?
Ye!
N_ ... 1 1. ...
013
.8. .Num.berof�initiating-circuits
.9....NuTber of signal circuits
Qoes�:alarm.:systerli:�meet�!audibility. stzindards:as accepiej�.'
s
Ye.
N 6,
11. All circuits checked for electrical sUpe—rLabon?
Yes L
No 13
All.-auxiliziry equipment opera EEe vator�
S( levato, a.h.s., clannPers)?
N/A
IT. Y s
e
No
13. Ventilation controls operate?
N/A,
Yes 173
:
No.
14. Key to panel. available?
Ye
No,
15. Operating instructions at panel?
I I
Yes 13
No 173
'i. 6.. Trolubleirid.icat or,s func tion;properly'?,
Yes: C]
No
17. Remote Annunciator Panels function properly?
N/A
Yes 11
No
.18. Elevato'r" Call Down functions properly?
No-
19. Test record posted at panel?
Yes
No
20.;:G neral...alarm,.auto matic�.time dela y: (min 0 es
21. Was a signal received at the Central Sta tion monito ring company?
22.. Other Devices (8piec'ify)
N/A
Yes 173
No
Yes
Total
Total Number Number
of Units in Units
SYstem Devices
Building Tested
Bells, �Horns Chimes
Test Results Acceptable
..23.
24. Voice Speakers (Voice Clarity)
M A
N/A
rl
e .
25�. Smoke Detectors J
:N A
h
Yes 171
Yes..
No 0
26. Heat Detectors
N/A
Yes M
No,Q
No 0
27.1 ors
N/A..
Yes 0
N o*
28. Sprinkler Flow Switches
N/A
f?.
Yes 13
No 11
21. Sorinkier Su, rv1-so�:y.Swkch'es:_.._
pe
"... � I. — .. : .:z
N/A
171,
Yes [3
No
30. Visual Alarm Devic[les
.
N/A
I?
Yes 11
No C3
31. Manu al'Pull Stations::'.
N/A
Yes 0:
No
32. Annunciator(s)
N/A
Yes 173
No 17111
33. Beam Detectors
N/A
Yes 13
No 0
34. Automatic Door Unlocks
N
N/A
A
Yes 0
No C1
�5. Automatic Door Release
N
N/A
A
Yes 173
No 71
36. Fire Dampers, every 4 yrs.
N
N/A
Yes 73
No 171
Total Number of Total Number
Communication Equipment Units in Building Units Tested
37.. Phone Sets
Test Results Acceptable
38. Phone Jacks
N/A
9�
Yes 0
No C3
39. Call -in Signal
N/A
19
Yes 13
Yes 13
No
No
�4_q
:�ire Alarm Svstems
3 RT
OF
E D M 0 N D S
336 Admiral Way - Edmonds, WA 98020-7214 - (425) 774-0549 . (425) 774-7837 fAX
DETERMINATION OF NON -SIGNIFICANCE
Description of Proposal: Port of Edmonds is proposing replacement of an existing access
ramp that provides access from a timber boardwalk area to floating boat docks M and N
for their operations on Port property.
The proposed project would be completed at the existing Port of Edmonds Marina. The
project area is located in the SE quarter of Section 23 of Township 27. Range 03.East.
Proponent: Port of Edmonds
Location of Proposal:
Port of Edmonds
336 Admiral Way
Edmonds, Washington 98020
Section 23 Township 27N Range 03E
Lead Agency: Port of Edmonds
The lead agency has determined that this proposal does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not
required under RCW 43.21C.030(2)(c). This decision was made after review of a
completed environmental checklist.
The DNS is issued under WAC 197-11-340(2); the lead agency will not act on this
proposal for 14 days from the date below. Comments must be submitted by July 1, 2008.
Responsible official: Mr. Christopher W. Keuss CNBI
Position/Title: Executive Director
Phone: 425 774-0549
Address: Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
Dat4 Signat
XX You may appeal this determination to Chris Keu ' ss, Executive Director, at 336
Admiral Way, Edmonds, WA 98020, by filing a written appeal citing the specific
reasons for the appeal with the required appeal fee, adjacent property owners list
and notarized affidavit fonn no later than July 1, 2008. You should be prepared
to make specific factual objections. Contact Chris Keuss to read or ask about the
procedures for SEPA appeals.
XX Posted on June 10, 2008, at the Port of Edmonds Administration office, Edmonds
Public Library, and the Edmonds Post Office.
Y_X
Distributed to "Checked Agencies" along with a copy of the Environmental
Checklist
XX
Environmental Review Section
XX
DNR SEPA Center
Department of Ecology
P 0 Box 47015
P 0 Box 47703
Olympia, WA 98504-7015
Olympia, WA 98504-7703
XX
CONIC AST
XX
Seattle Dist. US Army Corps of
Outside. Plant Engineer, North Region
Engineers
1525 75t' St SW #200
P 0 Box C-3755
Everett, WA 98203
Seattle, WA 98124
XX
Department of Fish & Wildlife
Y_X
Town of Woodway
16018 Mill Creek Boulevard
Attn: Clerk -Treasurer
Mill Creek, WA 98012
23920 113 Ih Place West
Woodway, WA 98020
XX
Washington State Dept of Transportation
XX
City of Edmonds
Attn Ramin Pazooki
121-5 Ih Avenue North
SnoKing Developer Services MS221
Edmonds, WA 98020
15700 Dayton Ave North
P 0 Box 330310
Seattle, WA 98133-9710
XX
Parks and Recreation Commission
XX
National Marine Fisheries
Box 42650
Service
Olympia, WA 98504-0917
Northwest Regional Office
7600 Sand Point Way NE
Seattle, WA 98115-0070
XX
Puget Sound Water Quality Authority
P 0 Box 40900
Olympia, WA 98504-0900
Attachments
TO BE CONTLETED BY APPUCANT EVALUATION FOR AGENCY USE ONLY
.A.BACKGROUND
1. Name of proposed project, if applicable:
Port ofEdmonds Dock Ramp Replacement
2. Name of applicant:
Port ofEdmonds
3. Address and phone number of applicant and contact person:
Chris Keuss, Executive Director
Port ofEdmonds
336 Admiral Way
Edmonds, WA 98020
Email.-ckeussAvortotedmonds. o
Phone:(425)774-0549
Fax:(425)774-7837
4. Date checklist prepared:
May 23, 2008
5. Agency requesting checklist:
Port ofEdmonds
6. Proposed timing or schedule (including phasing, if applicable):
Because ofhigh dock usage in summer, the proposedproject probably will not
begin until August or September 2008. Construction is expected to last
approximately 3 weeks.
7. Do you have any plans for fliture additions, expansion, or fiu-ther activity related
to or connected with this proposal? If yes, explain.
Nofuture additions or expansions are currently anticipated.
8. Lag any enviromnental information you know about that has been prepared, or
will be prepared, directly related to this proposal.
A JARPA applicationform will be completed and submitted to the USArmy
Corps ofEngineers (Corps) and the Washington Department offish'and
Wildlife (WDFFT9 for receipt of necessary authorization.
9. Do you know whether applications are pending for governmental approvals of
other proposals directly affecting the property covered by your proposal? If yes,
explain.
Only those applications covered in question 8 above.
10. List any government approvals or pem3its that will be needed for your
proposaL if Imown.
2
TO BE COMPLETED BY APPLICANT
It is anticipated that a Hydraulic ProjectApproval (HPA)ftom the TPDFW and
a general authorizationfrom the Coips will be required before construction can
commence.
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to -repeat those answers on this page. (Lead agencies may modify this form
ZD
to include additional specific information on project description.)
Theproposed activity is limited to the replacement ofan existing access ramp
thatprovides accessfrom a timber boardwalk area tofloating boat docky M
and N located in the southern portion of the marina. Due to the length of the
existing- ramp and tidalfluctuations, the existing ramp is too steepfor safe
pedestrian use. The existing 40-foot steel and treated timber access ramp would
be replaced with a 52-footprefabricated aluminum ramp with plastic treads.
ne access ramp terminates at afloat. To support the additional weight ofthe
longer ramp, additionalflotationfor thefloat may be necessary, which would
beprovided by the installation ofplastic-encasedpolysty-rene. Lastly, the
existing locking access gate which prevents the public omusingth c ess
fir ,, e a c
ramp would be repositioned to align with the ramp's new location. Please see
the attached drawingsfor details of the proposed access ramp replacement.
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a street
address, if any, and section, township, and range, if known. If a proposal would
occur over a range of area, provide the range or boundaries of the site(s).
Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. VvUle you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with
any permit applications related to this checklist.
The proposedproject would be completed at the existing Port ofEdmonds
Marina. ne marina is located at 336 Admiral Way in Edmonds, Washington.
ne project area is located in the SE quarter ofSection 23 of Township 2 7,
Range 03 East Please see the attached location mapforfurther details of the
project area.
B. ENVIRONMENTAL ELEMENTS
I.Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes,
mountainous,
The project site is entirely built out and essentiallyflat exceptfor the riprap
armored slopes underneath the timber boardwalk.
b. What is the steepest slope on the site (approximate percent slope)?
The riprap slopes underneath the timber boardwalk are approximately 45
degrees.
EVALUATION FOR AGENCY USE ONLY
TO BE CONPLETED BY APPLICANT
c. What- general types of soils are found on.the site (for example, clay, sand,
gravel, peat, muck)? If you know the classification of agricultural soils,
specify them and note any prime farmland.
The entireproject would be completed within areas that are currentlyfully
developed as pavedparking areas, timber�framed boardwalk, and timber-
fi-athed boat docla. Theref6re, no work would be completed on or adjacent to
native soils.
d. Are there surface indications or history of unstable soils in the immediate
vicinity? If so, describe.
No surface indications or erosion were evident during the site visit on April
22,2008.
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill.
No grading orfilling, will be required to complete theproposedproj' ct.
e
f. Could erosion occur as a result of clearing, construction, or use? If so,
generally describe.
Because no clearing or earth disturbance will be required to complete the
project, no erosion could resultfrom clearing or construction.
a
About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
t,
The project would not result in a net increase in impervious surtaces.
h. Proposed measures to reduce or control erosion, or other impacts to the earth,
if any:
Installing the new access ramp will require removing, portions of the existing
boardwalk to add the longer replacement gangway. In order to prevent
treated woodfibersfrom entering waterways, a particle collection tarp will
be installed below the boardwalk before cutting or drilling ofthe boardwalk
begin.
2. Air
a. What types of emissions to the air would result from the proposal (i.e., dust,
automobile, odors, industrial wood smoke) during construction and when the
0
project is completed? If any, generally describe and give approximate
quantities if known.
A small amount of emissions will resultfrom the use ofa small crane to
place the newgangway. No odors, dust, or other noxious air emissions are
expected to resultfront the project.
b. Are there any off -site sources of emissions or odor that may affect your
proposal? If so, generally describe.
None.
c. Proposed measures to reduce or control emissions or other impacts to air, if
any:
EVALUATION FOR AGENCY USE ONLY
TO BE COMPLETED BY APPLICANT
No emissions are expected,- therefore, no measures are required.
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the
site (including year-round and seasonal streams, saltwater, lakes, ponds,
0
wetlands)? If yes, describe type and provide names. If appropriate, state
wbat stream or river it flows into.
Yes, the marina is located in the Puget Sound. To prevent damage to
moored boats within the marina, the marina is surrounded by a
breakwater constructed of large riprap and boulders.
2) Will the project require any work over, in, or adjacent to (within 200
feet) the described waters? If yes, please describe and attach available
plans.
Yes. The proposed access ramp project will require over -water work.
This work will be limited to removing the existing access ramp,
modifying the -existing timber boardwalk, andplacing the new
prefabricated access ramp. Tide levels will determine the extent Of
actual overwater work; during low tide, the boardwalk andportions of
the access ramp are not over water. Please see the enclosedplans and
photosfor more detail.
3) Estimate the amount of fill and dredge material that would be placed in
or removed from surface water or wetlands and indicate the area of the
site that would be affected. Indicate the source of fill material.
Nofilling, or dredging will be required.
EVALUATION FOR AGENCY USE ONLY
4) Will the proposal require surface water withdrawals or diversions? Give
general description, purpose, and approximate quantities if known.
C,
No.
5) Does the proposal lie within a 100-year floodplain? If so, note location
on the site plan.
Yhe project is directly adjacent to Puget Sound, a tidal waterbody.
6) Does the proposal involve any discharges of waste materials to surface
waters? If so, describe the type of waste and anticipated volume of
discharge.
No discharge of waste materials is expected. BA'Ips will be employed
during construction to prevent wastefrom entering surface waters.
b. Ground:
1) Will groundwater be withdrawn, or will water be discharged to ground
water? Give general description, purpose, and approximate quantities if
Imown.
1Vo groundwater will be withdrawn and no water will be discharged to
groundwater.
TO BE CONIPLETED BY APPLICANT
2) Describe waste material that will be discharcled into the ground from
septic tanks or other sources, if any (for example: Domestic sewage;
industrial, containing the following chemicals... ; agricultural; etc.).
Describe the general size of the system, the number of such systems, the
number of houses to be served,(if applicable), or the number of animals
or humans the system(s) are expected to serve.
No waste material will be discharged.
c. Water runoff (including stormwater):
1) Describe the source of runoff (including storm. water) and method of
collection and disposal, if any (include quantities, if known). Where will
this water flow? Will this water flow into other waters? If so', describe.
Yhe.proposedproject will not result in an increase in impervious surface
or runofffrom precipitation.. Although the new access ramp will be 12
feet longer than the existing, ramp, the tread of the new access ramp is
more open and will represent less impervious surface. No collection or
treatment ofstormwater will be requiredfor the project.
2) Could waste materials enter ground or surface waters? If so, generally
describe.
A tarp or other suitable material will be installed underneath the
boardwalk to capture any wood debris or other material that would
otherwisefall into the marina waters. No debris is expected to enter
suiface or groundwaters. .
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any:
See above. -
4. Plants
a. Check or circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen, other
____,evergreen tree: fir, cedar, pine, other
shrubs
asture
crop or gram
Wet soil plants: cattail, buttercup, bulhush, skunk cabbage, other
water plants: water lily, eelgrass, milfbil, other
.other types of vegetation: Vegetation is limited to containerized
landscaping
b. What kind and amount of vegetation will be removed or altered?
None.
c. List threatened or endangered species known to be on or near the site.
None. Little native -vegetation exists within theproject area.
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
EVALUATION FOR AGENCY USE ONLY
TO BE COMPLETED BY APPLICANT
None.
5. Animals
a. Circle any birds and animals which have been observed on or near the site or
are known to be on or near the site:
birds: haw heron, gle, songbirds, other: various shorebirds
k(�
marnmals: dee�r,ear. elk, beaver, other: harbor seal, California sea hon,
stellar sea lionNe#beq-o1Gpknt seal
fish: bass, salmon, rout,%�� �ellfish �ther: Dungeness crab, common
E *
nl��e)benthic vertebrates
b. List any threatened or endangered species known to be on or near the site.
According to WDFWpriority habitat and species maps, thefollowing -
federally listed T and E species are known to utilize marine waters in the
immediate vicinity of the project area: coho salmon. In addition, resident
cutthroat trout, afederal species ofconcern, is known to use theproject
area. According to local WDFW biologists, salmonids are known to use
marina waters during annual migration.
c. Is the site part of a migration route? If so, explain.
The site is listed in the NOAA seabird colony database which documents
known locationsfor a variety ofseabirds. Therefore, it is a reasonable
assumption that the project area is used during annual seabird migration.
Due to the nature of the project, no changes to the suitability of the sitefor
usage by avian wildlife is expected.
d. Proposed measures to preserve or enhance wildlife, if any:
Yheproposedproject is not expected to increase impacts or degrade habitat
over existing conditions. As such, no preservation or enhancementfeatures
will resultfrom the project.
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be
used to meet the completed project's energy needs? Describe whether it will
be used for heating, manufacturing, etc.
The proposedproject is not expected to result in a net increase in energv
consumption as it is a passive improvement that is not lit, heated, or
otherwise uses enerV.
b, Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe.
No. The proposedproject will not result in the shading ofareas potentially
suitablefor the installation ofsolarpanels.
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts,
if any:
Mone, not applicable.
EVALUATION FOR AGENCY USE ONLY
7
TO BE COMPLETED BY APPLICANT
7. Envirorumental Health
a. Are there any environmental health hazards, including exposure to toxic
0
chemicals, risk of fire and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so, describe.
NO.
1) Describe special emergency services that might be required.
None.
2) Proposed measures to reduce or control environmental health hazards, if
any:
Not applicable.
b. Noise
1) What types of noise exist in the area which may affect your project (for
example: traffic, equipment, operation, other)?
Low volumes of traffic noise are present within the project area. Noise
is not qxpected to impact the proposedproject.
2) What types and levels of noise would be created by or associated with
the project on a short-term or. a Iong-term basis (for example: traffic,
construction, operation, other)? Indicate what hours noise would come
from the site.
Noise generatedfr07n the construction of the project will be limited to
common construction noise including drilling hammering, sawing, etc.
In addition, thegangways will be removed and installed by a small
crane. Construction will be limited to the normal working hours of
7:00am to 5:00pm. Due to the lack ofresidential developments in the
area, noise conflicts are not anticipated.
3) Proposed measures to reduce or control noise impacts, if any:
Construction activities will be limited to normal accepted working,
hours only.
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?
Yhe shoreline is currently being used as a marina. Adjacentproperties
include office buildings, a restaurant, parking areas, and boat storage
facilities.
b. Has the site been used for agriculture? If so, describe.
NO.
c. Describe any structures on the site.
Structures within the project site include a 2-story Office building that
house the Port ofEdnionds offices, a wooden boardwalk suspended above
EVALUATION FOR AGENCY USE ONLY
. 4
TO BE COMPLETED BY APPLICANT
EVALUATION FOR AGENCY USE ONLY
the riprap-armored shoreline of the marina, gangways leading down to
thefloating docks, and severalfloating docks.
C,
d. Will any structures be demolished? If so, what?
A smallportion of the existing boardwalk will be demolished.
e. What is the current zoning classification of the site?
CW- Commercial waterfi-ont
f. What is the current comprehensive plan designation of the site?
City ofEdmonds Master Plan.Area
Cr. If applicable, what is the current shoreline master program designation of
0
the site?
Urban Mixed Use I
h. Has any part of the site been classified as an "environmentally sensitive"
area? If so, specify.
Yhe open waters of the site would be considered environmentally sensitive
due to the presence ofmarine life andjederally listed ESA species during
particular times of the year.
i. Approximately how many people would reside or work in the completed
proj ect?
Not applicable.
j Approximately how many people would the completed project displace?
None.
k- Proposed measures to avoid or reduce displacement impacts, if any:
Not applicable.
1. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any:
Not applicable. Project will not result in a change in land use.
9. Housing
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing.
Not applicable.
b. Approximately how many units, if any, would be eliminated? indicate
whether high, middle, or low-income housing.
Not applicable.
c. Proposed measures to reduce or control housing impacts, if any:
Not applicable.
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
9
TO BE COMPLETED BY APPLICANT
Not applicable.
b. What views in the immediate vicinity would be altered or obstructed?
Not applicable.
c. Proposed measures to reduce or control aesthetic impacts, if any:
Not applicable.
11. Liaht and glare
b
a. What type of light or glare will the proposal produce? What time of day
would it mainly
occur?
None.
b. Could light or glare from the finished project be a safety hazard or
interfere with views?
M&O,
c. What existing off -site sources of light or glare may affect your proposal?
None.
d. Proposed measures to reduce or control light and glare impacts, if any:
]Vone.
12. Recreation
a. What designated and informal recreational opportunities are in the
immediate vicinity?
Recreation activities in the immediate vicinity include boating and other
aquatic recreation walking picnicking, and dining.
b. Would the proposed project displace any existing recreational uses? If so,
describe.
No, the project will not displace any existing recreational uses but instead
will increase safe access to existinggfloatingr docks.
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any:
No impacts areforeseen.
EVALUATION FOR AGENCY USE ONLY
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national, state, or
local preservation registers known to be on or next to the site? If so,
generally describe.
0
None.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
None.
c. Proposed measures to reduce or control impacts, if any:
10
TO BE COMPLETED BY APPLICANT
None.
EVALUATION FOR AGENCY USE ONLY
14. Transportation
a. Identify public streets and highways serving the site, and describe
proposed access to the existing street system. Show on site plans, if any.
The marinafacilities are accessedfromAdmiral Way. The proposed
access ramp is accessed via the public boardwalk extending along the
shoreline. Access to the ramp andfloating,, docks is limited to marina
members who have a key to the access gate.
b. Is site currently served by public transit? If not, what is the approximate
distance to.the nearest,transit stop?
Bus stops are located within 1, 000 yards of the marina.
c. How many parking spaces would the completed project have? How many
C,
would the project eliminate?
None. '
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so, generally describe
(indicate whether public or private).
NO.
e. Will the project use (or occur in the immediate vicinity oo water, rail, or
air transportation? If so, generally describe.
No.
f How many vehicular trips per day would be generated by the completed
project? If known, indicate when peak volumes would occur.
No increase in vehicle trips.
g. Proposed measures to reduce or control transportation impacts, if any:
None.
15. Public Services
a. Would the project result in an increased need for public services (for
example: fire protection, police protection, health care, schools, oth6r)? If
so, generally describe.
NO.
b. Proposed measures to reduce or control direct impacts on public services,
if any.
None.
16. Utilities
a. Circle utilities currently available at the site: electricity, natural gas, water,
refuse service, telephone, sanitary sewer, septic system, other.
Electricity, water, refuse service, telephone, sanitary sewer are all
available at the marinafacility.
I I
TO BE CONPLETED BY APPLICANT
b. Describe the utilities that are proposed forthe project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be needed.
None.
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I
understand that the lea(ragency is relying on them to make its decision.
�z t,
Signature:
Date:
EVALUATION FOR AGENCY USE ONLY
12
LEGAL DESCRIPTION
.... BELLINGHAM
P PU SC
UGET SOUND
REGION
..........
.......... .......
EVERETT
PROJECT
LOCATION
MMONDS
TACOMA
VICINITY MA
OLYMPIA NOT TO SCALE
PURPOSE: Replace Access Ramp
to Moorage Floats M and N with
.a longer, less steep ramp.
DATUM: MLLW
ADJACENT PROPERTY OWNERS:
1) ESC Associates
2� Union Oil Co.
3 Margaret B. Vorwick Trust
THAT PORTION OF GOVERNMENT LOT 3, SECTION 23, TOWNSHIP 27 NORTH
RANGE 3 EAST, WILLAMETTE MERIDIAN, IN SNOHOMISH COUNTY, WASHINGTON,
AND OF TIDELANDS ADJOINING DESCRIBED AS FOLLOWS: BEGINNING AT THE
INTERSECTION OF THE SOUTH LINE OF SAID SECTION 23 WITH THE WEST
MARGIN OF ADMIRAL WAY, THENCE N14D 48' 00"E ALONG SAID WEST MARGIN
TO THE SOUTHERLY MARGIN OF DAYTON STREET, THENCE NORTHWESTERLY
ALONG SAID SOUTHWESTERLY MARGIN AND THE EXTENSION THEREOF TO THE
INNER HARBOR LINE; THENCE S44D 58' 30"W ALONG SAID INNER HARBOR
LINE TO THE SOUTH LINE OF SAID SECTION; THENCE EASTERLY ALONG SAID
SOUTH SECTION LINE TO THE POINT OF BEGINNING.
EDMONDS (LAT 47*42'N, LONG
TIDAL INFORMATION
MEAN HIGHER HIGH WATER (MHHW)
MEAN HIGH WATER (MHW)
MEAN LOWER LOW WATER �MLLW)
f
EXTREME LOW WATER (ELW
122*23'W)
+10.9
+10.0
0.0
—4.5
LOCATION PLAN Proposed Replacement of Access
NOT TO SCALE lRamp to Floats M and N
IN: Puget Sound
AT: Port of Edmonds
PORT OF EDMONDS COUNTY: Snohomish
336 ADMIRAL WAY APPLICATION BY: Port of Edmonds
EDMONDS, WA 98020 SHEET: 1 of 5 DATE:04/28/08
�� 4
PROJECT
AREA
V,
ze
EELGRASS BEDS PER
PENTEC ENVIROMENTAL
SURVEY JULY 2001
7�
1? 45,
Ilk
rj
200 FT SHOR ELINE
BOUNDARY
PORT OF EDMONDS
ADMINISTRATION BLDG
0
PURPOSE: Replace Access Ramp NORTH MARINA PLAN Proposed Replacement of Access
to Moorage Floats M and N with Ramp to Floats M and N.
a longer, less steep ramp.
100 0 100 200
DATUM: MLLW Scale feet IN: Puget Sound
ADJACENT PROPERTY OWNERS: - AT: Port of Edmonds
1) ESC Associates PORT OF EDMONDS COUNTY: Snohomish
2� Union Oil Co. 336 ADMIRAL WAY APPLICATION BY: Port of Edmonds
3 Margaret B. Vorwick Trust EDMONDS, WA 980,20 SHEET: 2 of 5 DATE:04/28/08
A
5
LL - -LF- - - - 14
EXIST PILE L
LOCATIONS
EDGE OF
BOARDWALK
SUPPORT END OF RAMP
BY INSTALLING KNEE
BRACE TO PILE
YAA
REMOVE DECKING
INSTALL RAILING
TO MATCH EXIST
DC'kArNk/C' D11 C'
CAPS AND
INSTALL NE
W/GRATED
10 0 10 20
1"=10' I
scale feet
REMOVE EXIST
FENCING AND GATE
REMOVE EXIST 40' RAMP
EXIST LANDING FLOAT
ADD FLOATATION TO
SUPPORT HEAVIER RAMP
-.--EXIST TELE BOX
POSTS
q 52' RAMP
DECKING A
Hr�
Ix
EXIST FLOAT J
EXIST F.D.
STD PIPE!A
PURPOSE: Replace Access Ramp PLAN Proposed Replacement of Access
to Moorage Floats M and N with RAMP REPLACEMENT Ramp to Floats M and N
a longer, less steep ramp.
DATUM: MLLW IN: Puget Sound
ADJACENT PROPERTY OWNERS: AT: Port of Edmonds
1) ESC Associates PORT OF EDMONDS COUNTY: Snohomish
2� Union Oil Co. 336 ADMIRAL WAY APPLICATION BY: Port of Edmonds
3 Margaret B. Vorwick Trust EDMONDS, WA 98020 SHEET: 3 of 5 DATE: 04/28/08
RAIL AND DECKING
TO BE REMOVED
NEW RAMP TO
BOARDWALK EL +16.79
BE'ATTACHED
TOP OF WALL
EXIST
RAMP TO BE REMOVED
x
TOP OF WALL EL +15.85
H IGHEST OBSERVED TIDE, EL +12.91
MHHW +10.9
MTL +6.43
MLLW EL- 0.0
LTJ
ELW —4.5
ADD POLYSTYRENE
ENCASED FLOATATION
AS REQUIRED TO
SUPPORT HEAVIER RAMP
EXIST FLOAT
8 0
8 16
1/8"=V-0"
scale
feet
PURPOSE: Replace Access Ramp ELEVATION Proposed Replacement of Access
to Moorage Floats M and N with RAMP REPLACMENT Ramp to Floats M and N
a longer', less steep ramp.
DATUM: MLLW IN: Puget Sound
ADJACENT PROPERTY OWNERS: AT: Port of Edmonds
1) ESC Associates PORT OF EDMONDS COUNTY: Snohomish
2� Union Oil Co. 336 ADMIRAL WAY APPLICATION BY: Port of Edmonds
3 Margaret B. Vorwick Trust EDMONDS, WA 98020 SHEET: 4 of 5 DATE: 04/28/08
GHEST OBSERVED TIDE, EL +12.91
MHHW +10.9
MTL +6.43
MLLW EL 0.0
ELW —4.5
ADD POLYSTYRENE
ENCASED FLOATATION
AS NEEDED TO SUPPORT
HEANVIER RAMP
8 0 8 16
scale feet
PURPOSE: Replace Access Ramp SECTION Proposed Replacement of Access
to Moorage Floats M and N with RAMP REPLACEMENT Ramp to Floats M and N
a longer, less steep ramp.
DATUM: MLLW IN: Puget Sound
ADJACENT PROPERTY OWNERS: PO . RT OF EDMONDS AT: Port of Edmonds
1) ESC Associates 336 ADMIRAL WAY COUNTY: Snohomish
2) Union Oil Co. EDMONDS, WA 98020 APPLICATION BY: Port of Edmonds
3) Margaret B. Vorwick Trust SHEET: 5 of 5 DATE: 04/28/08
Westfall, John
From: Smith, Mike
Sent: Thursday, March 06, 2008 7:19 AM
To: Fire Dept Group
Subject: RE: Standpipe Testing at the Port of Edmonds
I can't remember if I already sent this out but all standpipes at the Port passed their 5 year test and are fully functional.
Call with questions.
Thanks
----- Original Message -----
From: Smith, Mike
Sent: Wednesday, February 27, 2008 3:23 PM
To: Fire Dept Group
Subject: RE: Standpipe Testing at the Port of Edmonds
The leak at the FDC on E & F docks has been fixed and the standpipe is functional.
Testing for the rest of the docks continues.
FYI
----- Original Message -----
From: Smith, Mike
Sent: . Monday, February 25, 2008 4:09 PM
To: Fire Dept Group
Subject: Standpipe Testing at the Port of Edmonds
All standpipes at the Port will have their 5 year hydrostatic testing done this week.
At present the standpipe for E and F docks is OOS due to a leak found at the FDC. It should be operable by
tomorrow.
I will keep all posted on the progress of the testing.
Please do not do any drills on the docks this week.
Thanks
"? 3 6C A -,Om I ---- -/
Westfall, John
From: Smith, Mike
Sent: Monday, February 25, 2008 4:09 PM
To: Fire Dept Group
Subject: Standpipe Testing at the Port of Edmonds
All standpipes at the Port will have their 5 year hydrostatic testing done this week.
At present the standpipe for E and F docks is OOS due to a leak found at the FDC. It should be operable by tomorrow.
I will keep all posted on the progress of the testing.
Please do not do any drills on the docks this week.
Thanks
Tomberg, Thomas -3; 3 C L._�
From: Schmitt, Bob
Sent: Friday, September 15, 2006 10:10 PM
To: Fire Dept Group
Subject: Boat Information
Below are a few items for your review.
Boat and Dock Security- There are two Supra Key boxes on the north gate post. The new box (on the left) has the key for
the gate padlock and a second key for the deadbolt for the doors fore and aft of the boat cabin. The ignition keys are
under the desk top inside the cabin. When entering the gate to go to the boat, please remember to shut the gate so it
does not stick out along the boardwalk. The key box on the right was relocated here from the south side of the Port
Operation's Office (located south of Anthony's). This box contains the port boat key, the master gate key (for all other
docks), and a key to get into the dry storage padlocks. This relocation was approved by the Fire Marshal. The code for
the two Supra Key boxes is USA.
Fueling- There is a gas card located under the desk top in the cabin area. Before you can fuel the boat, you have to go
through a 5-10 minute training session with one of the Port employees. Try to gather in large groups to receive the training
so we do not take up too much of the employee's time training us. There is a contract that all of us must sign when we
complete the training.
Log Book- The log book is located below the desk top and should be filled out when ever you train or complete periodic
maintenance on the boat. The log book should include the names of the personnel, the date and time of the visit, the
activity you performed, and the time you completed your visit.
Operations- Lt. Heryla is drafting a procedure for getting the boat under way. He should have this complete on September
17th. We'll use this guideline as our crews first introduction to the boat. Do not take the boat out unless you have one of
the members that delivered the boat to Edmonds, in attendance, and only if they feel comfortable taking it out. For the Fire
Department, these members include Lt. Heryla, Lt. Oftedahl, Lt. White.
Punch List- There will be a note pad under the desk top of items we still have not completed. If you find something wrong
or needs fixing, please write it on the note pad and email BC Schmitt and Dave Sittauer to inform us of the problem. If it is
a major item, notify your BC and he'll determine the best course of action. If you have other suggestions, send them
through your boat shift rep- Lt. Heryla, Lt. Oftedahl, and Lt. White. These member's will forward the ideas to BC Schmitt.
Safety and PFDs- Unless I am misinterpreting the standard, you should not need to wear your PFDs if you are at dockside
just familiarizing yourself with the boat. If you are preparing to take the boat out, put your PFD on and keep it on until you
secure the boat. There are plenty of PFDs aboard the boat so you do not need to take them off your rig.
Periodic Maintenance- We will be developing a weekly maintenance sheet for the boat.
Bob Schmitt
Battalion Chief, A -Shift
425-771-0261 ext. 1269
425-754-1828 cell
Page I of I
*�3
Westfall, John
From: Roger Dudley [rdudley@triton-marine.com]
Sent: Thursday, May 12, 2005 7:43 AM
To: Fire Dept Group
Cc: Pam Lemcke; 'Robert Hymel'; 'Lindsay, Rich'; 'Chris Keuss'; 'Elmer Ozolin'; 'Rich Davis'
Subject: cut cap and relocation of the fire main loop within the construction area edmonds waterfront
To all concerned parties ,
Please find following notification that Triton Marine construction will perform the cut and cap work necessary to relocate and
upsize the fire main as discussed at the weekly construction meeting of 5-11-05 . this work will start at 3:00 am on the
morning of 5/17/05 this work will be completed by 6:30 am . The line will be re -energized at that time. If you have any
questions in this matter or if you require additional coordination please contact me by e-mail or cal me at 425-712-1264.thank
you for your assistance and cooperation in this matter.
Roger Dudley
Triton Marine Const.
5/12/2005
;
P-0 R T
OF
I D M 0 N D S
CONSTRUCTION UPDATE NOTICE
EDMONDS WATERFRONT PROJECT
Posted: March 14,2005
Project Schedule
0 Procurement Phase
0 Mobilization Phase
• South WWTP Outfall Repair
• Storm Dram' Outfall Replacement
• North Seawall/Timber Bulkhead Replacement
• Mid Marina Breakwater Repair
Match 2
— August 24, 2005
March 1
- March 11, 2005
March 9
— June 9, 2005
City Project
June 8 —
July 29, 2005
City Project
July 15 —
October 31, 2005
Port Project
July 15 — November 7, 2005
Port Project
South Wastewater Treatment Plant Outfaff Repair Project Work - Next 2 to 3 Weeks
• Install project signage
• Setup traffic control devices/signage
• Remove the Olympic Beach ramp slab.
* Setup the dewatering area.
• Install cathodic protection at the top of the ramp at the beach site.
• Start vault excavation subject to issuance of the building permit.
Construction fence/barrier with sound proofing will be installed separating the construction site
from the Landing building — April.
Project Impacts to the Public
0 Walkway along the beach will be impacted and the pedestrian walkway will be rerouted around the
construction area.
Portions of the beach area will be impacted.
Construction area will be fenced off.
Contact for this phase: Pam Lemcke, City of Edmonds - 425 771-0220
a I
EDMONDS WATERFRONT PROJECT SCHEDULE.
I. PROCUREMENT PHASE
March 2, 2005 to August 24, 2005
11. MOBILIZATION PHASE
March 2, 2005 to March 11, 2005
III. SOUTH WASTEWATER TREATMENT PLANT OUTFALL REPAIR
CITY OF EDMONDS
March 9, 2005 to June 9, 2005
IV. STORM DRAIN OUTFALL REPLACEMENT
CITY OF EDMONDS
june'8, 2005 to July 29, 2005
V. NORTH SEAWALL/TIMBER BULKHEAD REPLACEMENT
PORT OF EDMONDS
July 15, 2005 to October 31, 2005
VI. MID MARINA BREAKWATER REPAIR
PORT OF EDMONDS
July 15, 2005 to November 7, 2005
Contact Person: City of Edmonds — Pam Lemcke — 425 771-0220
Port of Edmonds — Chris Keuss — 425 774-0549
Message
Wesffall, John
-- Pagelof2
From: Smith, Mike
Sent: Monday, January 24, 2005 9:13 AM
To: Wesffall, John
Subject: RE: Edmonds Waterfront Preconstruction Meeting
Yes
----- Original Message -----
From: Westfall, John
Sent: Monday, January 24, 2005 8:39 AM
To: Smith, Mike
Subject: FW: Edmonds Waterfront Preconstruction Meeting
Importance: High
Mike:
I'm at the Fire Conference in Ocean Shores. Are you available Monday?
John
----- Original Message -----
From: Gebert, David
Sent: Friday, January 21, 2005 3:18 PM
To: 'mtrohimovich@cosmogrp.com'; Fiene, Don; Lemcke, Pam; Koho, Steve; Lindsay, Rich; Mcintosh, Brian;
Westfall, John; Smith, Mike; Miller, Noel; Waite, Jim; Kammerer, Jim
Subject: FW: Edmonds Waterfront Preconstruction Meeting
Importance: High
The Port is trying to schedule a preconstruction conference for the waterfront project for sometime the first week in
February. I need to let the Port know what times that week will work best.
For all of you City staff receiving this e-mail, I will check your outlook calendars on Monday and try to pick times
that work best for us, so please make sure your outlook calendars are current if you wish to attend this
preconstruction conference.
Jim Waite, your outlook calendar looks like you are booked almost solid that entire week, so I'll do the best I can,
and if you are not able to make it, feel free to send a rep.
Merita, can you please let me know by Monday what times that week work for you.
Thanks,
Dave
----- Original Message -----
From: Bev Borth [mailto:BBORTH@PORTOFEDMONDS.ORG]
Sent: Friday, January 21, 2005 1:54 PM
To: jarcher@triton-marine.com; 'Gebert, David'; 'Elmer Ozolin'; 7ina Drennan'
Subject: Edmonds Waterfront Preconstruction Meeting
Importance: High
I have been tasked with setting up the Edmonds Waterfront Preconstruction meeting the first week of February. As
youkhow, there will be a lot of different schedules to work with. I am requesting that you get back to me as soon
as you can regarding your schedule the first week of -February. Do you prefer an-pulor pm meeting?
Plan on bringing any staff members you feel should attend this meeting.
Dave — please contact Cosmopolitan Engineers for their schedule and invitation to this meeting.
Chris Keuss is unavailable on Thursday, February 3 from 9am — 1 pm.
1/24/2005
1, �
city of edmonds
land use application
0 ARCHITECTURAL DESIGN REVIEW
0 COMPREHENSIVE PLAN AMENDMENT
0 CONDITIONAL USE PERMIT.
0 HOME OCCUPATION. 6ky?z
1(00,0
0 FORMAL SUBDIVISION t4emtc
I 6t)
0 SHORT SUBDIVISION 'r , -
0 LOT LINE ADJUSTMENT
--J-5
0 PLANNED RESIDENTIAL DEVELOPMENT
0 OFFICIAL STREET MAP AMENDMENT
0 STREET VACATION
0 REzONE
K SHORELINE PERMIT
0 VARIANCE / REASONABLE USE ExCEPTION
FILE # _!!�705 -14 ZONE
DAT (915- REC'D BY
C
FEE4 't-7(, -
7G 6, " RECEIPT# _759
15
HEARING DATE
0 HE 0 STAFF /,4,PB 0 ADB 0 CC
ED
PROPERTY ADDRESS OR LOCATION 456 Admiral
PROJECT NAME (IF APPLICABLE)
Public Plaza
PROPERTY OWNER Port of Edmonds
FE!')` iE i, 2.005
NTER
PHONE # 425 774-0549
ADDRESS 336 Admiral Way Edmonds, -WA 08020
E-MAILADDRESS ekeuss@portofedmonds.org FAX # 425 774-7837
TAX ACCOUNT# 4-014 SEC. 23 TwP. 2 7 RNG. 03 SE
DESCRIPTION OF PROJECT OR PROPOSED USE Convert small parking area in front
oi the Edmonds Yacht Club into alandscaped Public Plaza.
APPLICANT Port of Edmonds —PHONE# 425 774-0549
ADDRESS 336 Admiral Way Edmonds, WA .08020
E-MAILADDRESS. ekeuss@portofedmonds.org FAx# 425 774-7837
CONTACT PERSON/AGENT_ Chris Keuss PHONE #425 774-0549
ADDRESS 336 Admiral Way Edmo nds, WA 98020.
E-MAIL ADDRESS ekeussoportof edmonds. org FAX# 425 774-7837.
The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application
agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including
reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading,
inaccurate or incomplete information furnished by.the applicant, his/her/its agents or employees.
By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my
knowledge and that I am authorized to file this application on the behalf of the owner as listed below.
SIGNATURE OF APPLICANT/AGENT
Property Owner's Authorization
DATE
By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use
application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject
property for the purposes of inspection and p ting attendant to this application.
00�,Iwl
t DA
SIGNATURE OF OWNER T E*:
This application form was revised on 1/27/00. To verify whether it is still current, call (425) 771-0220.
L:\LE3RARY\PLANNFNG\Fomis & HandoutsTublic HandoutsUnd Use Application.doc
, I
71
:3ms
Ism;
A LL "J
TAW
STONE MONUMENT TO
"C. KENNETH WISE"
E MON U MEN .08 F
WIS
T
/KENNETHE'To
FE
L
SCALE: 1"-20'-0" WASTE
M 10CAN
0 10' 20' 40' NEW GRASS BERM
PUGET SOUND
MHW 10.06'
RAISED CONCRETE PLANTER
RESTING ON CONCRETE DECK.
PLANTER HEIGHT = 2.6'
(TYPICAL)
REMOVE RAMP
MEET AND MATCH NEW H
CONCRETE TO EX -St. SIDEWALK
(a) .09
NEW CONCRETE PAVER WALKWAY
RAISED WOOD DECKING
RESTIN ON CONCRETE DECK.
WOOD DECKING HEIGHT = 0.9
(TYPICAL) NEW ADA
ACCESSIBLE
RAMP .09
NEW WOOD DECK x
L
REMOVE RAMP --"ff
PATCH ASPHALT,
MEET AND MATCH
C 0 N,
GRIND OFF
(i)jj
RM #3
PK NAIL
N 298577.01
E 1257550.33
RIM
IE,,N
A <
8)_
EXHAUST VENT FAN
R43-ABOVE SIDEWALK
NEW SCORED
CONCRETE PLAZA
BUILDING
NEW WOOD ARBOR
�-,,�,111AINTA]IN EXISTING RAMP.
ANDICAP MEET AND MATCH NEW
PARKING PAVING TO EXST RAMP.
`--SIGN EXST PARKING STALL
AS SHORT TERM AND
RELOCATE HANDICAPED,
STALL
BULKHEAD LINE
FLAGPOLE
0 EJB
RM #4
.10 TACK IN LEAD
G) N 298698.30
-S ONCRETTE CUR E 1257695,97
N,FW PAY 0 ME ELEV = 13.42'
RAIS #2 G
----AT I R
4.10
GAS LANTERN ON 8' POLE
RAISED CONCRETE
PLANTER 2.6' ABOVE
CONRETE (TYP.)
CBMH #1
RUN DC*NSPOUT ALONG
TREWS INT %PLANTER
CUT AND CAP CST . PIPE AND CB
TECT EXISTING GRl*E.TRAP
AND SURROUNDING COftRETE
GREASE SEPARATOR
VAULT
BUILDING 9,
\M EN&
IM
BEGIN ARBOR
MAXIMUM HEIGHT 10'-5"
NEW EXPOSED AGGREGATE
CONCRETE PLAZA
El
0
0
0
< X X 35 HANDRAIL 0
—P— POWER LINE 16-
-W— WATER LINE
DATA BASED ON INFORMATION
SUPPLIED BY OTHERS.
n
STORM DRAINAGE TABLE
CB
#1, RIM =
12.83
4 "
PVC E, I E
= 11. 3
8"
CONC NE,
IE = 9.8
CB
#2, RIM =
12.81
8"
CONC SE,
IE = 9.2
CBMH #1, RIM
= 13.34
8"
METAL NE,
lE 8.8
8"
CONC SW,
IE 8.8
8"
CONC NW,
IE 8.6
SURVEY LEGEND
ENCASED CONCRETE MONUMENT
PK NAIL / TACK IN LEAD
CB CATCH BASIN
CBMH CATCH BASIN MANHOLE
DS DOWNSPOUT
CO CLEANOUT
LIGHT POLE
FL FLOOD LIGHT
EJB ELECTRICAL JUNCTION BOX
FH FIRE HYDRANT
WV WATER VALVE
HB HOSE BIB
SIGN
LEGEND
6.
7 —LIMITOFWORKUNE
UNE
—SWALE
PROPOSED CONTOUR,
113M
EXISTING SPOT TO REMAIN
BROOM FINISH CONCRETE
BARKER
E=
SCORED CONCRETE
LANDSCAPE
EXPOSED AGGREGATE CONCRETE
ARCHITECTS
PAVERS
1514 NW 52nd St
Seattle, WA 981L07
SAND
tel 206.783.2870
GRASS
fax 206.783.3212
WOOD DECK
BOULDERS
C)
C14
TYPE I CB WITH STAR GRATE
c�
OD
a < a%
STEEL PLANTER WITH VINES &
PERENNIALS
z
U
C) CL
0
E
LLI
Lu
PROJECT DESCRIPTION
LL. u
0
THE PORT OF EDMONDS PUBLIC PLAZA
PROJECT WILL REPLACE A CURRENTLY
,UNDER UTILIZED PARKING LOT WITH A
NEW WATERFRONT PLAZA FOR USE BY
THE PUBLIC AND ANTHONYS BEACH
0 CL
CL
CAFE
%0
Lo
PROJECT INCLUDES DEMOLMON OF
ASPi-iALT, CONCRETE SIDEWALK AND
DATE
INITIALl
SAND BOX WITHIN LIMITS OF WORK
1/7/2005
DRAWN
ABC
LINE, AND REMOVAL OF AWNINGS.
PROPOSED IMPROVEMENTS INCLUDE
REVIEWED
jFB
NEW CONCRETE AND PAVER
'HARDSCAPE, DRAINAGE, WOOD DECK
,WITH ADA ACCESS, WOOD ARBOR
REVISIONS
ALONG BUILDING FACADE, SAND PLAY
No.
DATE
JAREA, GRASS MOUND, BOULDERS AND
'PLANTING.
1THE MAXIMUM HEIGHT OF THE TALLEST
� PROPOSED STRUCTURE IS THE ARBOR
.ALONG THE BUILDING FACADE AT IT
SCALE I "=20'-O"
TALL
A TESC PLAN AND CONSTRUCTION
DETAILS WILL BE SUBMITTED WITH THE
BUILDING PERMIT APPLICATION.
PLAN
NE PERMIT]
SHEET
-OF 2 SHEETS
SCALE: 1 "-30'-0"
0 1 S' 30' 60'
RAISED CONCRETE PLANTER
RESTNG ON CONCRETE DECK.
it
PLANTER HEIGHT = 2.6'
(TYPICAL)
RAISED WOOD DECKING
RESTIN ON CONCRETE DECK.
WOOD DECKING HEIGHT = 0.9-
(TYPICAL)
CB#S (NEW)
RIM 12.86
SEE ADD ALT C,
B&C
(Dj]
RM #3
PK NAIL
N 298577.01
E 1257550.33
ELEV = 13.01
(D
ASPHALT
I
ION
PARKING
01
STONE MONUMENT TO "I
"C. KENNETH WISE* BULKHEAD LINE
FLA P
F EJB
RM #4
10 TACK IN LEAD
WASTE N 298698.30
CAN E 1257695.97
WASTE ELEV = 13.42'
4As LANTERN ON 8' POI,�
RAISED CONCRETE
PLANTER 2.6' ABOVE
CONRETE (TYP.)
COMH #1
IIIIIIIIIIIIIN.
m 0 a 91/5
STORM DRAINAGE TABLE
bN�. IS 0 -Z a-
CS RIM
. 00v
a "10
4
r r4
#I, = 12.83
4' PVC E, IE = 11.3
1��
8' CONC NE, IE = 9.8
C8 #2. RIM = 12.81
;jr
pug
8* CONC SE, IE = 9.2
I
IMP'.
GREASE SEPARATOR
VAULT
CBMH #1, RIM = 13.34
BUILDING '9.
8: METAL NE, IE = 8.8
8 CONC SW, IE = 8.6
8' CONC NW, IE = 8.6
`-ADDITIVE ALTERNATE B
;VE�HAUST VENT FAN RAISE RIM OF CB# 1. TIE
AU'
A1306VE SIDEWALK DOWNSPOUT INTO CB#I.
CONNECT NEW CB#S TO
EXISTING CB#I WITH 6"0 3034
PIPE. ADD ADDITIONAL STAR
13UILDING GRATE AND FRAME.
ADDITIVE ALTERNATE C
CONNECT CB#5 TO EXST. CB TO THE SOUTHEAST INSTEAD
OF CB#1 AS SHWON ON BASE BID. LOCATION OF
SOUTHEAST CB IS APPROXIMATE. IF ADD ALT C IS
AWARDED, LIMITS OF WORK WILL EXPAND.
ADD ALTERNATE A
REMOVE APPROX. 165'STAMPED CONCRETE "PAVERS", REPLACE
WITH CONCRETE SAWCUT INTO 23" GRID, SEE DETAIL IF ADD
ALT A IS AWARDED, LIMITS OF WORK WILL EXPAND.
LEGEND
_LIMITOFWORKLINE
-SWALE
LINE
- - -
PROPOSED CONTOUR
+1110
EXISTING SPOT TO REMAIN
BROOM FINISH CONCRETE
SCORED CONCRETE
EXPOSED AGGREGATE CONCRETE
PAVERS
SAND
GRASS
WOOD DECK
BOULDERS
TYPE I CB WITH STAR GRATE
0
STEEL PLANTER WITH VINES &
PERENNIALS
SURVEY LEGEND
I� �NCASED CONCRETE MONUMENT
I
PK NAIL / TACK IN LEAD
0 CB CATCH BASIN
@ CBMH CATCH BASIN MANHOLE
0 DS DOWNSPOUT
BARKER
LANDSCAPE
ARCHITECTS
1514 NW 52nd St.
Sealtle, WA 98107
tel 206.783.2870
fax 206.783.3212
C)
C4
C)
V) CD
z
0
0
E
Lu _v
LL u LU
c�
0 zi �:
cc
'E
0 CL
d-
Ln
V_
0
CO CLEANOUT
uAlt
INITIALl
1
1/7/2005
LIGHT POLE
DRAWN
ABC
FL FLOOD LIGHT
REVIEWED
JFB
EJB ELECTRICAL JUNCTION BOX
REVISIONS
FIT FIRE HYDRANT
NO.
DATE
WV WATER VALVE
HB HOSE BIB
I
SCALE I"=30'—O"
n
SIGN
X 3.5' HANDRAIL
L= I"
x
-P-
POWER LINE
ADDITIVE
W-
WATER LINE
ALTENATES
DATA BASED ON INFORMATION
SHORELINE PERMIT
SUPPLIED
B� OTHERS.
SHEET
2
OF 2SHEETS
DETERMINATION OF NON -SIGNIFICANCE
Project: Port of Edmonds Public Plaza
Description of Proposal:
The Port of Edmonds is proposing to replace a currently under utilized parking lot with a new waterfront
public plaza for use by the public. The public plaza will cover approximately 7,625 square feet.
Work will- include demolition of asphalt, concrete sidewalk and sand box, and removal of awnings. Twelve
parking stalls will be eliminated and one ADA stall will be relocated. Proposed improvements include new
concrete and paver hardscape, drainage, wood deck and ADA access, a wood arbor along the building
faqade, sand play area, grass mound, landscape boulders and planting. This plan has been approved by the
Edmonds Architectural Design Board. There are three additive alternatives. Additive alternate A would
replace a pedestrian walkway outside the base bid limits of work which is broken up. Additive alternate B
is a change in drainage connections within the base bid limits of work. Additive alternate C is a change in
drainage connections outside the base bid limits of work.
Proponent: Port of Edmonds
Location of Proposal:
Port of Edmonds
456 Admiral Way
Edmonds, Washington, 98020
Section 23 Township 27 Range 03 SE
Lead Agency: Port of Edmonds
Thelead agency has determined that this proposal does not have a probable significant adverse impact
on the environment. An environmental impact statement (EIS) is not required under RCW
43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other
information on file with the lead agency. This information is available to the public on request.
This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for 14 days
from the date below. Comments must be submitted by:
February 25, 2005
Responsible official: Mr. Chris Keuss
Position/Title: Executive Director
Phone: 425-774-0549
Address: Port of Edmonds
a;;7 336 Admiral Way
Edmonds, WA 98020
Date:
Signature
Chris Keuss
336 Admiral Way
Mr. Rob Chave
Planning Manager
City of Edmonds
121 — 5h Ave N
Edmonds, WA 98020
Dear Rob:
3ORT
OF
E D M 0 N D S
WA 98020-7214 - (425) 774-0549 - (425) 774-7837 FAX
September 23, 2004 RECEIVED
NOV 0 5 2004
PERMIT COUNTER
The Port has a proposal to replace its concrete docks on the north side and east side of out
floating bait house, which is between H dock and dock I dock (fuel dock). Attached is a site
plan showing the location of these docks. Also, attached is a detailed plan showing the exact
docks to be replaced. The replacement docks will be the exact length and width of the
existing docks.
The reasons for the replacement of the docks are:
i. Existing docks are too deep and ate bottoming out during low tide conditions.
2. Connector points are being damaged due to the bottommig out situation.
The new floats will be half the depth of the existing floats and will have new connector
pieces that will provide some "give" during the extreme low tides when the new docks do
bottom out.
On behalf of the Port, I am requesting an administrative exemption from the Shoreline
Permit Requirement. Again, the reason for this request is that the Port is replacing existing
docks with the exact same measurements (except for depth) due to the aforementioned
conditions. I would appreciate your review and decision as soon as possible. I will be out of
the office over the next two and a half weeks. If you have questions, please contact Bob
Yeager, Maintenance Manager, who is very familiar with this project and can be reached at
425 774-0549.
Sincerely yours,
Christopher W. Keuss CMM
Executive Director
cc: Bob Yeager
46 feet+
Port of Edmonds
Dock Replacement
41
0
D= MTAL
-f
00
M
E DMONDS
P Port of Ed onds Marina
0 P, T 0 F
1 111111
TTTTIT
Port Information Rules
Leave no wake; harbor speed limit 4 knots.
All visiting vessels are required to register upon arrival.
Guest fees: (Payable in advance)
Moorage: First four hours free; after four hours-50� per foot per day
Electricity: $2.00 per day
-out time: 12:00 noon.
Check
Diving is prohibited in the marina unless by Port permission.
No fishing, crabbing, squidding or swimming in the marina,
No motorized vehicles, bicycles or roller sports on walkways or on docks/piers.
Loud and disruptive behavior is prohibited.
Please use the recycling and trash containers for marina -related refuse.
Posting of signs, posters or distribution of handbills must be approved by the Port.
Consumption of alcoholic beverages on Port property is prohibited (except by licensed permit and Port approval).
Pets must be on leash and owners are responsible for proper clean up and disposal of animal waste.
Storage of items on docks and piers is prohibited.
. Q-Pont / Q-Dock '
Better solutions for the Marina Industry
Represented by
Rob King
R. C. Construction & Management Inc.
20503 88'h Av. W. Edmonds, WA. 98026.
425-778-1921
Mr. Bob Yeager
Port of Edmonds
336 Admiral Way
Edmonds, WA. 98020
RECEIVED
NOV 0 5 2004
PERMIT COUNTER
November 21, 2003
RE: Port of Edmonds, Floating dock replacement project. Quote requested 11-17-03 by Bob Yeager
SCOPE:
1. Replace concrete floats on walkway dock betw!,op'�'b�ce 22 inch fiveboard (from H dock)
mished floats (16"' ch ft, board) to the North. (App. 72 feet).
and the older aggregate f
�e
Using the Q-Dock concrete walk surface galvanized' �-channel flqx(system-
2. Reconnect the power lift finger to new flo
ats.
3. Reconnect fire fine to new floats.
4. Replace, and connect the "Bud's Bait" finger (49 with new floats. (includes
recormection of the "Bud's Baif 'bus m*'ess float)
V
Work includes design, construction, and installation of floats to m6&-, ii�\d match up with
existing BM1 floats. Means of longitudinal connection inctude&
P4;� o\f Edmonds \agrees to provide a work yard close by . to fabricaib\out., - system'fior
initallatiQn. Installation includes Crane, (as needed).
Pvrt T tern'Kie,
--Permits,"miscellancous fees, removal and disposal of existing marina 'elements, Washington
State Sales\,T.ax\,\
Quote for this worl�jk
$19,350.00.
Q-Pont /Q-Dock will honor"quolib for thirty days. Work must take place within 180 days or we
reserve the right to re -quote ifie'
pk�ject-*ith then current material prices.
1%
Thank you for the opportunity to,,0rovide\yoi
Sincerely,
Rob King
with a lasting repair to your unique problem.
J
Z
Wesffall, John
From: Harrison, Marie
Sent: Wednesday, December 01, 2004 12:45 PM
To: Westfall, John
Subject: RE: Port of Edmonds float 04-521
Thank you. Robert Yeager 425-774-'0549
A,b j46i"171—_ 9-04�)
----- Original Message -----
From: Westfall, John
Sent: Wednesday, December 01, 2004 12:41 PM
To: Harrison, Marie
Subject: RE: Port of Edmonds float 04-521
I'll call him.
----- Original Message -----
From: Harrison, Marie
Sent: Wednesday, December 01, 2004 12:38 PM
To: Westfall, John
Subject: RE: Port of Edmonds float 04-521
Does Robert Yeager know what he needs to do?
----- Original Message -----
From: Westfall, John
Sent: Wednesday, December 01, 2004 12:34 PM
To: Harrison, Marie
Cc: Bullis, Ann; Smith, Mike; DST
Subject: RE: Port of Edmonds float 04-521
Marie:
It's called a Fire Standpipe system (permit-IFC 105.7.11) but in this case "fits" best administratively like a Fire
Alarm Permit: $150 fee (50 Bldg / 50 Fd in-house review / 50 FD inspect).
Thanks for asking.
Can we use Fire Protection System Permit to cover everything else that doesn't fit Fire Sprinkler or Fire
Alarm? They are infrequent and can be tracked in your FA/FS statistics. And some occurences may require
outside technical review.
John
----- Original Message -----
From: Harrison, Marie
Sent: Wednesday, December 01, 2004 11:52 AM
To: Westfall, John
Subject: Port of Edmonds float 04-521
Hi John: You wrote on the plans "f ire protection system required". What do you
mean by f ire protection system? Fire alarm? Fire Sprinkler?
Thanks
E. Wane %amson, CYPT
(Devefopment Services
City of Edmonds
1
Message Page I of I
AA-
Westfall, John
From: Westfall, John
Sent-' Friday, November 12, 2004 1:06 PM
To: Fire Dept Group
Subject: FW: Temporary Closure of Marina Beach/Dog Beach
Members:
Grid 151. The park is being closed to repair the sinkhole and effluent line that is located in the north parking lot,
south of Port drystack storage yard.
Vehicular access will be maintained for emergency purposes only.
FM
----- Original Message -----
From: Mcintosh, Brian
Sent: Friday, November 12, 2004 12:30 PM
To: All City
Subject: Temporary Closure of Marina Beach/Dog Beach
FYI - please spread the word to your neighbors as this has happened rather quickly. Thanks!
November 12, 2004
Contact: Brian McIntosh, Parks, Recreation & Cultural Services Director 425-771-0256
Pam Lemke, Engineering Department 425-771-0220
Edmonds Marina Beach & Dog Park Temporarily Closed
Due to the extent Qemergency repairs to the Willow Creek pipeline at Marina Beach Park in Edmonds,
the park, including all ks beginning Monday,
November 15, 2004.
11/12/2004
dw-
lp C. is 9,3
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0215 - FAX (425) 775-7721
FIRE DEPARTMENT Established 1904 www.edmondsfire.org
October 7, 2004
Mr. Chris Keuss
Port Director
Edmo�ds, WA 98b20_
Re: Marina Standpipe Systems Inspection, Testing, and Maintenance
Dear Chris:
GARY HAAKENSON
MAYOR
Mr. Ray Johnson asked me specifics regarding the 5-yr hydrostatic test for the Port
Marina fire protection standpipe systems. I hope you will share this letter with Bob and
Ray regarding the general and specific information I've provided here.
The existing standpipes systems were installed in 1998 and later. They are comprised of
fire department connection fittings, steel pipe joiners, hangers, outlets approximately
every 100' along the piers and HDPE (high -density polyethylene) piping laid underwater
as the primary conveyance for fire protection water. The HDPE piping is not a listed
material for fire protection service and was approved as an alternative material in this
fire protection service application. I still feel this is a perfectly sensible application for the
marine environment, where corrosion and freezing temperatures can impair and shorten
the life of steel pipe.
Normal acceptance testing of steel pipe systems include a hydrostatic integrity test
typically implemented at 200 psi for 2 hours. Because of the elasticity of the HDPE, a
hydrostatic acceptance test variation was approved that included a series of hourly
pressurizations until the HDPE had reached less than a 2% drop (4 psi) for a 2 hour
interval. I believe this same testing method can be repeated to meet the intent for the
required 5 year hydrostatic test of HDPE. I have attached a copy of those acceptance
tests for your review. I discourage maintaining these pressure levels in the HDPE for
anymore time than required to meet positive test results.
As of July 1 with the adoption of the International Building and Fire Codes, there are
new requirements in the inspection, testing, and maintenance (ITM) for all water -based
fire protection systems. The owner's responsibility and proper documentation for ITM
procedures are now specifically outlined and mandated by State law. As ominous as this
sounds, the purpose here is the continued assurance that fire protection systems will
operate as designed and as installed for the owner's best interests throughout the life of
a structure and for the sake of fire emergency responders. The requirements for
standpipe ITM comes from NFPA Standard 25 Chapter 3 that I have included with this
letter. Some requirements may not apply to every system, depending upon configuration
Incorporated August 11, 1890
Sister Citv - Hekinan. JaDan
and material used. Those applicable requirements, however, are now the minimum
acceptable inspections, tests and frequency requirements and may (or may not)
constitute a great change in how the Port maintains your systems and service
documentation. Previous limited maintenance requirements came from national fire
protection standards of serviceability.
Servicer "qualifications" also are currently being evaluated by the State and Snohomish
County to establish a standard of expertise to perform the various levels of ITM for a
particular type of fire protection system. I will let you know when these requirements are
adopted and published. For now, Bob and Ray may continue their ITM work as "having
adequate knowledge of the (system) installation, construction, or operation of apparatus
and the hazards involved".
Please call me at (425) 771-0213 if you have further questions regarding this letter and
the changes herein. Please provide Inspector Mike Smith or myself with a copy of your
satisfactory test documentation and be sure to save your original.
Si
I ohn J. We9tfall
ire Marshal
Cc: Fire Chief Tomberg
* Q
i
June 5, 1998
Bill Gerkin, P.E.
Peratrovich, -Nottinghm & Drige, Inc.
8 11 first Avenue, Suite 260
Seatfle.. WA 99104
Subjcct: Edmonds Marina Reconstruction, HYro' test of Fire Protection Lines
Dear Bill:
McGOWAN BROZ
f U G I N k f R S
J have reviewed 'lie hydrotest procedure and results for the HDPE fire.lines at the Edmonds Marina.
The procedure that was used to test the fines is full): comparable to a two-hour static test on an
equivalentiron pipe system. The procedure used at the marina, in which the HDPE pipe is "stretched"at
a pressute. slightly higher than test pressure and then allowtd to relax, is appro-.)riata for the rriatenal and
fulfiUs. tile intent of the des' gn drawings and specifications.
In. my opinion, the system as installed and tested meets die intent of the di-awings and is satisfactory for
Multidiscipline service.
reqba-L-fif!�X
Please call Bil! Lchner or me. if you have any questions.
Sincere",
William R, Broz, P. E.
Vice President
"2
r7 EVIRES
I N f : i ) k P , ) R A T F. D
12928 Northup ANay - Suite 2CO
UNc,mc, Washington 98005
T- 425�646-3588 - F: 425/646-9843
3
1(): ZI 86. Unf
-S�9113 20',49 NUM09DW
14, V11 vo I J. 00 &44vu U44 1000 r ;I 0"n I I L�V_
95427.19C Port of Edmonds Marina Reconstruction
SOUTH MARINA FIRE LINE PRESSURE TEST
08/12/98
Lm Press
Kentzarg
7:15 AM 230 psi
8:15 AM
230 psi
9:15 AM
220 psi
10:25 AM
220 psi
Test 11:10 AM 205 psi
Bleed back to test pressure from 220 psi, P, N & D
inspector on site to witness test.
12:10PM 203 psi
Passed
08/13/98
IWX
Pressure
Re -Charge
7:30 AM
230 psi
8:15 AM
220 psi
9:00 AM
220 psi
Test 1:50 PM
205 psi
Bleed back to test pressure from 218 psi, P, N & D
inspector on site to witness test.
2:55 PM
202 psi
Passed
uti/ V51/98 u1j: U9 UZOU
U24 1388
V N & 1) SLATILE
itij U U Z/ U.U.13
95427.19C
Port of Edmonds Marina Reconstractian
PORT OF EDMONDS MARINA
RECONSTRUCTION
SOUTH MARINA FIRE LINE
PRXSSURF TEST
Time
Pressure
Min, Re-Cbarae
05/28/98
C-D Dock Fire 8:45 AM
220 psi
10:30 AM
195 psi
220 psi
11:30 AM
205 psi
220 psi
1:00 PM
210 psi
Reduce to 200 psi for test, P, N & D inspector not on site
3:00 PM
195 psi
PN & D inspector on site, Re -Charge to 200 psi for test
Test 3:00 P.Ad
4:00 PM
200 psi
196 psi
_j
Passed �WIXY)PD
05/28198
E-FDockFire ID:20AM 220 psi
11:30 AM
189 psi
220 psi
1:00 PM
190 psi
220 psi
2:15 PM
195 psi
220 psi
3:15 PM
197 psi
P, ' N & D inspector on site, cbarge to 200 psi for test
Test 3.15 PM
200 psi
4:15 PM
196 psi
Passed 4a�.D
06J03/98
G Dock Fire
11:30 AM
220 psi
12:30 PM
199 psi
220 pai
1:30 PM
210 psi
220 psi
2:30 P_N4
213 psi
Left at 213 psi
Test
3:25 PM
209 psi
P, N & D insp=or on site, start test at 209 psi
4:25 PM
202 psi
Passed
06/04/98
14 Dock Fire
System under
pressure overnight 210 psi to 190 psi
7:30 AM
Igo psi
220 psi
8:30 AM
212 psi
2120 psi
9:30 AM
218 psi
Lieft at 21,13 psi
10: 15 AM
215 psi
P, N &_ D inspt:clor on site, reduced pressure to 200 psi for test
Test
10:15 AM
11:15 AM
210 psi
209
Passed
psi
4fig 7 /L.-
06/05/98 09: 09 U206 624 1.388 P & D SEATTLE
95427.19C Port of Edmonds Marina Reconstruction
L0063/UO3
NORTH MARINA FIRE LINE PRESSURE TEST
lim
Pressure
01/26/93
M Dock Fire
9:00 AM
2^110 psi
10:30 AM
195 psi
11:30 AM
195 psi
12:30 PM
205 psi
1:30 PM
205 psi
Test
2:30 PNI
205 psi
3-30 PM
195 psi
N Dock Fire
9:00 AM
230 psi
10:30 AM
195 psi
11:30 AM
200 psi
12:30 PM
200 psi
1:30 PM
215 psi
Test
2:30 P1*1
205 psi
3:35 PM
196 psi
K Dock Fire
9:30 AM
230 psi
10:30 AM
215 psi
11:30 AM
210 psi
12:30 PM
210 psi
1:30 PM
205 psi
Test
2:25 PM
205 psi
3:00 PM
205 psi -14
4:00 PM
205 psi r-'
OV29198
1womej
215 psi
215 psi
215 psi
215 psi
Bleed back to test pressure, P, N & D inspector on site
Passed e� �ww
215 psi
215 psi
215 psi
Bleed back to test pressure, P, N & D inspector on site
- —'d
Passed/'��z -WOD
215 psi
215 psi
215 psi
Bleed back to test pressure, P, N & D inspectoT on site
Passed 45A
I Dock Fire
10:OOAM
200 psi
215 psi
11:00 AM
204 psi
215 psi
12:00 PM
205 psi
215 psi
1:00 PM
205 psi
215 psi
2:00 PM
205 psi
215 psi
Test
3:00 PM
205 psi
4:00 PM
205 psi t.
Passed
L D,,jck Fire
9:30 AM
230 psi
10:30 AM
210 psi
11:30 AM
195 psi
215 psi
12:30 PM
200 psi
215 psi
1:30 PM
207 psi
215 psi
Test
2:30 PM
207 psi
3:45 PM
199 psi
Passed
J Dock Fire
9:45 AM
230 psi
10:45 AM
200 psi
215 psi
11:45 AM
205 psi
215 psi
1:00 PM
200 psi
215 psi
2:00 PM
204 psi
215 psi
Test
3:00 PM
205 psi
Bleed tack to test pressure
4:00 PM
205 psi
Passed
Plot:. Tesr performed as per manufactures recomendedprocedure.
National Fire Codes 0 Online - Copyright (0 NFPA, All Rights Reserved Fage I of 2-1
Chapter 1 General Informition
1-1 Scope.
d ifiaintenafi66 bf
This document establishes the'Mim'"IMEM" 'i mefiff f6r e peno ic inspection;,testing, an
require
watei-based fire protectibfi'�y'sie"ii'i"i fficlt . idiirg ffid_FiWid.ihid 'm�-a'r"m.'re"�a-wp"plications. The types of sistems
"ted d,
d h6k" fi)Eid'iWat& spray,an
'"Vn , d i ,
addressed by this standard iric Me,- f,"sthfidpipe an
_Ltd,
I n c I i i d i d'a 're, fl; Oe "WwtF s u - I 1'e, -s � t fiak'a r 'e such as private fire service mains and
fd�` pabf these syste
'U%i&s that *F6" I
appurtenances; ift pumps arid'-ww-at_e'r#"st6r*agp ffiKifid i�ifei� 066w:, The document also
addRsses impairment handling and reporting. This standard applies to fire protection systems that have been
properly installed in accordance with generally accepted practices. Where a system has not been installed in
accordance with generally accepted practices, the corrective action is beyond the scope of this standard. The
corrective action to ensure that the system performs in a satisfactory manner shall be in accordance with the
appropriate installation standard. (See Cha ter 12.)
p - ___ 4"7wW`_ith_� �FPAI
TO --d_&c'ord'an`ce
d nd hillid in
c4f' 77"iis sta�ddrd shall not apply to sprinkler.#stim--s'design
F.i e a ins
or t& JWs"tadl'�tio"!nhf �ikkr tems in One- and To;6-F�rmly L)�,ellings and Manufacture'd
Standardf
Homes.
1-2* Purpose.
The purpose of this document is to provide requirements that ensure'a'reas6i�abl"e'd.e'�gi-ee"of protection 0 life
thod§ for water-b;ised fire'
and pfooertj fi6A'firi"thr6ugli mn 1 'mum mspection� t6ting�'and maintenance me
*0.
ection sys ems.-
rt
In those cases where it is determined that an existing situation can involve a istinct h t lif or prope y,
r1w 'iind'iriaint6h&i6Ji-ffi*eth6ds in'- I
'he a-pitho-n-6y, fiNym"' Efigirihill-13.
gJunsdi b& befffiftfiid to require inspection, testing,
.Xdess*of tho'se reqfii�d bfih� kkidird.
1-2. A' plication.
- t-L* p
It is not the intent of this document to limit or restrict the use of other inspection, testing, or maintenance
programs that provide an equivalent level of system integrity and performance to that detailed in this document.
The authority having jurisdiction shall be consulted and approval obtained for such alternative programs.
1-3 Water -Based Fire Protection System Descriptions.
1-3.1* Sprinkler System.
An integrated system of underground and overhead piping designed for fire protection purposes and designed in
accordance with fire protection engineering standards. The installation includes one or more automatic water
supplies. The portion of the sprinkler system above ground is a network of specially sized or hydraulically
designed piping installed in a building, structure, or area, generally overhead. Sprinklers are attached to the
piping in a systematic pattern. The valve controlling each system riser is located in the system riser or its supply
piping. Each sprinkler system riser includes a device for actuating an alarm when the system is in operation.
The system usually is activated by heat from a fire and discharges water over the fire area.
Wet Pipe System. A sprinkler system employing automatic sprinklers attached to a piping system
containing water and connected to a water supply so that water discharges immediately from sprinklers opened
by heat from a fire. (See Chap -
--- ors 2 and 9.) Hose connectionsP 1/2-in. (38.1-mm) hose, valves, and nozzles]
supplied by sprinkler system piping are considered components of the sprinkler system.
Antifteeze System. A wet pipe system employing automatic sprinklers attached to a piping system
containing an antifreeze solution and connected to a water supply. The antifreeze ' solution is discharged,
Ilowed by water, immediately upon operation of sprinklers opened by heat from a fire. (See ChqpLers_2 and
Dry Pipe System. A system employing automatic sprinklers attached to a piping system containing air or
littn-//PrlmnnAcrilp/nfnnhin/IneytriliNFPA/nfn,qOOO').5 I/nfe-eiirrent-11910?fn=document-frame.h... 9/27/2004
National Fire Codes & Online - Copyright C NFPA, All Rights Reserved Page 2 of 21
nitrogen under pressure, the release of which (as from the opening of a sprinkler) allows the water pressure
to open a valve known as a dry pipe valve. The water then flows into the piping system and out the opened
;prinklers. (See Chapters- 2 and 9.)
Deluge System. A system employing open sprinklers attached to a piping system and connected to a
water supply through a valve that is opened by the operation of a detection system installed in the same areas as
the sprinklers. When this valve opens, water flows into the piping system and discharges from all sprinklers
attached thereto. (See Chqptjer4� 2, 7, 8
- , and 9.)
Preaction System. A sprinkler system employing automatic sprinklers attached to a piping system
containing air that might or might not be under pressure, with a supplemental detection system installed in the
same areas as the sprinklers. Actuating means of the valve are described in 3-3.2.1 of NFPA 13, Standardfor
the Installation ofSprinkler Systems.'After the valve has been actuated, it opens, and water flows into the.
sprinkler system piping to be discharged from any sprinklers that are open. (See Chaptcjjs 2 and 9.)
Combined Dry Pipe-Preaction System. A sprinkler system employing automatic sprinklers attached to a
piping system containing air under pressure, with a supplemental detection system installed in the same areas as
the sprinklers. Operation of the detection system actuates tripping devices that open dry pipe valves
simultaneously and without loss of air pressure in the system. Operation of the detection system also opens
listed air exhaust valves at the end of the feed main, which usually precedes the opening of the sprinklers. The
detection system also serves as an automatic fire alann system. (See Chaphers-2 and 9.)
1-3.2 Standpipe System.
An arrangement of piping, valves, hose connections, and allied equipment installed in a building or structure
with the hose connections located in such a manner that water can be discharged in streams or spray patterns
through attached hose and nozzles for the purpose of extinguishing a fire, thus protecting a building or structure
and its contents in addition to protecting the occupants. This is accomplished by connections to water supply
systems or by pumps, tanks, and other equipment necessary to provide an adequate supply of water to the hose
onnections. (See Chaptgr
fVet Stand1fipeSystein. A system that has the supply valve open and the water pressure maintained at all
times.
Dry Standpipe System. A system that shall be arranged as follows:
(a) Includes devices to admit water to the system automatically by opening a hose valve
(b) Admits water to the system through manual operation of remote control devices located at each
hose station
(c) Has no pen-nanent water supply (A filled standpipe having a small water supply connection to keep
the piping filled by requiring water to be pumped into the system shall be considered to be a dry
standpipe.)
1-3.3 Combined Standpipe and Sprinkler Systern.
A system where the water piping services both 21/2-in. (63.5-mm) outlets for fire department use and outlets for
automatic sprinklers. (See ChaDlers 2 and 3.)
1-3.4 Private Fire Sen-ice Main.
The pipe and its appurtenances located on private property between a source of water and the base of the riser
(i.e., the flange, the flange and spigot piece, or the base tee) for automatic sprinkler systems, open sprinkler
systems, water spray fixed systems, standpipe systems, inlets to foam -making systems, or the base elbow of
private hydrants or monitor nozzles. Where connected to a public water system, the private service main begins
at a point designated by the public water utility, usually at a manually operated valve near the property line.
Wher e connected to fire pumps, the main begins at the fire -protection- system side of the pump discharge valve.
Where connected to a gravity or pressure tank, the main begins at the inlet side of the tank's check valve. (See
�qpti�r 4.)
Private fire service mains can include supply and distribution piping installed above ground, in trenches, and
inside or outside of buildings. The provisions of this section also apply to pipeline strainers.
6"n-//PAmr%nrlcfilp/nfnnk;n/lnpvtrll]/MPPA/nfn,qnOO?5 I/nfe.-ciirri-.nt-119109fn=clor.iiment-frqmf-.b 9/7.7/?004
.'t
National Fire Codes 9 Online - Copyright (D NFPA, All Rights Reserved
Page lof4
Chapter 3 Standpipe and Hose Systems
3-1 General.
This chapter provides the minimum requirements for the routine inspection, testing, and maintenance of
standpipe and hose systems. Table 3-1 shall be used to deten-nine the minimum required frequencies for
inspection, testing, and maintenance.
Exception: Valves andfire department connections shall be inspected, tested, and maintained in accordance
with Chapter_q.
3-1.1 Impairments.
The inspection, testing, and maintenance of standpipe and hose systems can involve or result in a system that is
out of service. The procedures outlined in Chapterl-l- shall be followed where such an impairment to protection
occurs.
3-2 Inspection.
3-2.1
Components of standpipe and hose systems shall be visually inspected quarterly or as specified in Table -3- 1.
3-2.2
Checkpoints and corrective actions outlined in Table.3-2.3 shall be followed to determine that components are
free of corrosion, foreign material, physical damage, tampering, or other conditions that could prevent
operation.
3-2.3
1 able 3-2.3 shall be used for the inspection, testing, and maintenance of all classes of standpipe and hose
systems.
3-3 Testing.
The tests shall be conducted by a qualified person. (See Section 1-5.)
Where water damage is a possibility, an air test shall be conducted on the system at 25 psi (1.7 bar) prior to
introducing water to the system.
3-3.1 Flow Tests.
3-3.1.1*
A flow test shall be conducted at the hydraulically most remote hose connection of each zone of a standpipe
system to verify the water supply still adequately provides the design pressure at the required flow. Where a
flow test of the hydraulically most remote outlet(s) is not practical, the authority having jurisdiction shall be
consulted for the appropriate location for the test.
A flow test shall be conducted every 5 years.
Table 3-1 Summary of Standpipe and Hose System Inspection, Testing, and Maintenance
Components Activity Frequency Reference
Control valves Inspection Weekly/monthly Table 9-1
Pressure regulating devices Inspection Quarterly Table 9-1
Piping Inspection Quarterly 3-2.1
Hose connections Inspection Quarterly Table 9-1
Cabinet Inspection Annually NFPA 1962
All /XTI:D A
National Fire Codes 0 Online* - Copyright (D NFPA, All Rights Reserved Page 2 of 4
Hose
Inspection
Annually
NFPA 1-9.62
Hose storage device
Inspection
Annually
NFPA 1962
Alarm device
Test
Quarterly
Table 9- 1
Hose nozzle
Test
Annually
NF-PA.1962
Hose storage device
Test
Annually
NFPA--196-2.
Hose
Test
5 years/3 years
NFPA.1962
Pressure control valve
Test
5 years
Table 9-1
Pressure reducing valve
Test
5 years
Table 9-1
Hydrostatic test
Test
5 years
3-3.2
Flow test
Test
5 years
3-3.1
Main drain test
Test
Annually
Table.9-:1
Hose connections
Maintenance
Annually
Valves (all types)
Maintenance
Annually/as needed
Table 9- 1.
Table 3-2.3 Standpipe and Hose Systems
Component/Checkpoint
Corrective Action
Hose Connections
Cap missing
Replace
Fire hose connection damaged
Repair
Valve handles missing
Replace
Cap gaskets missing or deteriorated
Replace
Valve leaking
Close or repair
Visible obstructions
Remove
Restricting device missing
Replace
Manual, semiautomatic, or dry
Lubricate or repair
standpipe — valve does not operate
smoothly
Piping
Damaged piping
Repair
Control valves damaged
Repair or replace
Missing or damaged pipe support
Repair or replace
device
Damaged supervisory devices
Repair or replace
Hose
Inspect
The hose, including gaskets, shall be removed and inspected and the
hose reracked or rereeled at intervals in accordance with NFPA
j 902, Standardfor the Care, Use, and Service Testing of Fire Hose
Including Couplings and Nx%-Ies.
Mildew, cuts, abrasions, and Replace with listed, lined,jacketed hose
deterioration evident
Coupling damaged Replace or repair
Gaskets missing or deteriorated Replace
Incompatible threads on coupling Replace or provide thread adapter
L--. I --- +All /XTVDA I/nf�--i-iirrpnt-l*?ni4?fn=(inc.iime.nt-frime.h... 9/27/2004
T,,Iational Fire Codes 9 Online - Copyright 0 NFPA, All Rights Reserved
Page 3 of 4
Hose not connected to hose rack
nipple or valve
Hose test outdated
Hose Nozzle
Hose nozzle missing
Gasket missing or deteriorated
Obstructions
Nozzle does not operate smoothly
Hose Storage Device
Difficult to operate
Damaged
obstruction
Hose improperly racked or rolled
Nozzle clip in place and nozzle
correctly contained?
If enclosed in cabinet, will hose rack
swing out at least 90 degrees?
Cabinet
Check overall condition for corrod.ed
or damaged parts
Difficult to open
Connect
Retest or replace in accordance with N_FPA 19.62, Standardfor the
Care, Use, and Service Testing of Fire Hose Including Couplings
and Aoz:les.
Replace with listed nozzle
Replace
Remove
Repair or replace
Repair or replace
Repair or replace
Remove
Remove
Replace if necessary
Repair or remove any obstructions
Repair or replace parts; replace entire cabinet if necessary
Repair
Cabinet door will not open fully Repair or move obstructions
Door glazing cracked or broken
if cabinet is break -glass type, is lock
functioning properly?
Glass break device missing or not
attached
Not properly identified as containing
fire equipment
Visible obstructions
All valves, hose, nozzles, fire
extinauisher, etc., easily accessible
Replace
Repair or replace
Replace or attach
Provide identification
Remove
Remove any material not related
3-3.1.2
All systems shall be flow tested and pressure tested at the requirements in effect at the time of the installation.
The actual test method(s) and performance criteria shall be discussed in advance with the authority having
jurisdiction.
3-3.1.3
Standpipes, sprinkler connections to standpipes, or hose stations equipped with pressure reducing valves or
pressure regulating valves shall have these valves inspected, tested, and maintained in accordance with the
requirements of Chapter 9.
.3.1.4
A main drain test shall be perfortned on Class II or III standpipe systems in accordance with the requirements of
ChapteiL9. The test shall be performed at the low point drain.for each standpipe or the main drain test . I
III MTT" A h... 9/9.7/2004
'"LlUllal r ire Uodes 0 Online - Copyright 0 NFPA, All Rights Reserved
Page -,I
connection where the supply main enters the building (when provided). Pressure gauges shall be Provided for
the test and shall be maintained in accordance with 2-3.2.
3-3.2 Hydrostatic Tests.
3-3.2.1
Hydrostatic tests at not less than 200-psi (I 3.8-bar) pressure for 2 hours, or at 50 psi (3.4 bar) in excess of the
maximum Pressure, where maximum pressure is in excess of I So psi ( bar), shall be conducted every 5
years on dry standpipe Systems and dry Portions Of wet standpipe systems.
10.3
3--1.2.- 2*
Hyd ostatic tests shall be conducted in accordance with 3-3.Z I on any system that has been modified or
repaired or where an inspection indicates that there is rea-_ j -
Properly in an emergency. son to believe that the system could fail to operate
3-3.2.3
The hydrostatic test pressure shall be measured at the low elevation point of the individual system or zone being
tested. The inside standpipe Piping shall show no leakage.
3-3.3 Alarm Devices.
Where provided, waterflow alarm and supervisory devices shall be tested on a quarterly basis.
Excepaon: ff"herefre
alloivs. ez'ng cOndifions necessitale a delay in festing, fests shall be petfornied as soon as ij -ealher
3-4 Maintenance.
Maintenance/repairs shall be in accordance with 3-2,3 and Tab
3-5 Records. -le 3-2.3.
I
�ecords shall be maintained in accordance with Section 1-8.
ATIT11 A
Wesffall, John
From: White, Donald
Sent: Wednesday, March 17, 2004 2:10 PM
To: Fire Dept Group
Subject: Port hydrants
FYI,
5 hydrants South of the fuel dock including the rack storage area are out of service until further notice. The hydrants on the
East side of Admiral way "should" be in service per the Water Department. Water will keep us informed as they get more
info, and they will be on scene to assist us while they are making emergency repairs. DW
�PORT
�OF
E D M 0 N D S
y EdpbQds, WA 98020-7214 (425) 774-0549 (425) 774-7837 FAX
_=V
R�4
Mr. John J. Westfall
Fire Marshal
City of Edmonds
121-5 h Ave N.
Edmonds, WA 98020
Dear Mr. W
JFD) E C ",EiO V, 115E
February 20,2004 1 �*'6
C(
FEB 2 3 2004
EDMONDS FIRE D.EPT.
I have recently received your letter dated February 7, 2004 regarding City Council Ordinance
#3452, which increases Fire Pern-,dt Fees to $30. It is my understanding from discussing this
situation last year with Councilmember Wilson, council representative, assigned to the Port
of Edmonds, that the Port would be exempt from payment of this fee. The exemption is
based on the fact that the Port of Edmonds does provide several gratis programs to the City
of Edmonds Fire Department and that the inspection fees and other permitting fees would
be offset by the services provided by the Port.
Please feel free in contacting my office should you have any questions or wish follow up to
the aforementioned.
Sincerely Yours,
aeu-4-�
Christopher W. Keuss CMM
Executive Director
cc: Commissioner Fred Gouge
Councilmember Dave Orvis
CITY OF EDMONDS GARY HAAKENSON
MAYOR
121 5TH AVENUE NORTH EDMONDS, WA 98020 - (425) 771-0215 FAX (425) 775-7721
FIRE DEPARTMENT www.edmondsfire.org
C. 1 February 24, 2004
Mr. Chris Keuss
Port Director
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
Dear Chris:
I apologize for the oversight in our fire permit review and billing process. You will not be
responsible for Permit fees. We will forward your permits to you by virtue or our earlier
arrangements facilitated through Councilmember Wilson.
The $90 permit fees (three locations) are not an exemption for you. City ordinance does not allow
the Fire Department to arbitrarily exempt fees for one private enterprise or another, including not -
for -profit businesses and places of worship. Permitted occupancies all require annual safety
surveys that are conducted by Fire Inspectors under billable hours, and that is the rationale for the
change in fee structure. The Port of Edmonds fire inspection hours and permit fees are provided
"in -kind" for training/emergency use of your oil spill craft and locker rental for firefighter's foul -
weather equipment used during emergencies at the Port.
I apologize again for the billing error. Thank you for staying fire -safe!
Cc: Mayor Haakenson
Fire Chief Tomberg
n J. Westfall 11,
Marshal
Incorporated August 11, 1890
Sister Citv - Hekinan, Japan
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0215 - FAX (425) 775-7721
FIRE DEPARTMENT
C_
. 1 SC)",
Mr. Chris Keuss
Port of Edmonds
in in a I , a,
'E'r1FH`5`nd9—,VVX-98020
Dear Chris:
www.edmondsfire.org
August 8, 2003
GARY HAAKENSON
MAYOR
This letter is in response to your concern regarding the coiling of shore pow' er cordsets on the
docks at each slip with electrical utilities. Port of Edmonds Regulations (Jan 2000) Section 16.2
G specifically prohibits the practice. Your questions are whether this is a valid concern and why?
The use of electrical wiring in a marina environment requires special consideration due to the
existence of hazards from: 1) wet and corrosive moisture, 2) high and low temperature
exposures, 3) flammable and combustible liquids use and storage, 4) electrical equipment and
facilities used by persons with limited control by management staff, and 5) locations subject to
movement, mechanical shock, and vibrations. All electrical materials, devices, appliances,
fittings, cords and cordsets shall be listed or labeled for their purpose by a qualified testing
agency, e.g. Underwriter's Laboratories (UL) or Factory Mutual (FM). The electrical devices or
cords should not be altered.
The codes and standards utilized to evaluate these concerns include Uniform Fire.Code (UFC)
Article 85, National Fire Protection Agency (NFIPA) 70-National Electrical Code Article 555, NFPA
302-Fire Protection Standard for Pleasure and Commercial Motor Craft, NFPA 303-Fire
Protection Standard for Marinas and Boatyards, and NFPA's Fire Protection Handbook.
The Fire Department has no problems with the coiling of listed marine shore power cordsets on
the pier. NFPA 302 recommends that shore power cords be a minimum length of 25 feet. Coiling
the cords can reduce trip hazards on the pier.
I am unsure of the history surrounding this requirement, however, concerns may have stemmed
from inferior cords fabricated by boat owners that did not meet ampacity requirements for the
service. Electrically undersized cords can heat, and when coiled, can heat themselves further,
posing risk of fire and injury. To meet the listing standards for Shore power cords and marine
extension cords, the,wires are generous in ampacity, moisture -resistant, and better insulated than
their "shore" counterparts. Cords need still be verified to meet the maximum and minimum
limitations for the particular service that they will be put to use. I endorse the Port's cord
inspection and tagging program identified in Section 16.2 F.
Please contact me at (425) 771-0213 if you have further questions.
Sincerely,
Jopn J. W
Fife Mars[
Cc: Chief Tomberg
a Incorporated August 11, 1890 0
E L)
FIRE PREVENTION 13UREAU
121 5th Avenue North, Edmonds, WA 98020
(425) 771-0213 Fax (425) 775-7721 . 0
FAX COVER PAGE'
TO: DATE TRANSMITTED:
NUMBER OF -PAGES:
(Including Cover Page)
Recipient's Fax Number:
-7-74 -763.7
-Z
FROM: j - W, If there are any problems
FIRE DEPARTMENT during transmission or
documents are received
incomplete, please call
(425) 771TO215 and ask
for JOHN WESTFALL
5�
TRANSMISSION VERIFICATION REPORT
TIME 08/08/2003 11:29
NAME
FAX
TEL
DATEJIME
08/08 11:28
FAX.NO./NAME
94257747837
DURATION
00:01:02
PAGE(S)
02
RESULT
OK
MODE
STANDARD
ECM
Westfall, John
From:
Westfall, John
Sent:
Monday, August 25, 2003 1:56 PM
To:
Fischer, Michael
Cc:
Smith Mike
Subject:
Port �tandpipult���
Sorry for the belated response. The period for standpipe hydrostatic test is five, years. Docks M & N were recently
installed and accepted. The rest of the port systems are probably soon due.
The HDPE plastic now specified and installed on all docks does stretch under pressure. 200 psi hydro pressure for 2
hours is a parameter for rigid wall (steel) pipe. With HDPE, a series of cumulative pressurizations and stretches is
completed then the 2 hour test with no more than 10% loss. More time required to test, but greater pipe longevity.
John
.13 I-S" 6 A4) /'It k 4A_ L_
CITY OFEDMONDS
121 5TH AYENUE NORTH EDMONDS, WA 98020 (425) 771-0215 - FAX (425) 775-7721
FIRP-��)FPARTMENT www.edmondsfire.org
Re: Electrical Usage/Installation Concerns at Port of Edmonds
Dear Mr. Kruzich:
W
GARY HAAKENSON
MAYOR
Fire Chief Tomberg received your letter of concern of 5/28/03 regarding the electrical
installation and usage at the Port of Edmonds. Chief Tomberg forwarded your
questions to me for determination and resolution. I notified the City Building Official who
is the local precedent authority for building and electrical installations.
On 5/29/03 1 made telephone contact with Mr. Jim Hendricks, Electrical Inspections
Supervisor for WA State Division of Labor and Industries (L&I), Everett office. The City
of Edmonds Development Services Department has no electrical inspection division -all
electrical permits and inspections are administered by the Everett L&I office. Mr.
Hendricks immediately assigned one of his inspectors to review the installation and
practices of concern.
On 5/30/03 1 provided a faxed Agency Inspection request to the Everett L&I office to
report and clarify your concerns. I included a copy of your letter with my request. .1
interpreted your concerns to include the following: 1) the use of circuit breaker as a
switch for fixed -installation heater, 2) prior approved installation of the heater and circuit
disconnect, 3) location of the disconnect in relation to the heater equipment, 4) practice
of disconnecting the heater and circuit in ambient temperatures over 40 degrees F., anc
5) outstanding current electrical installation permit 2063062.
The State inspection found no deficiency of installation nor improper/unsafe use of
equipment. The 1969 installation was evaluated against the (then current) 1968 edition
of National Electrical Code (NEC). There are seldom new requirements that warrant
upgrade of previously -approved and existing installations in any of a building systems'
work. Consumer- and manufacturer -recalled equipment is an example of what might be
required of the owner to be upgraded/replaced, should that equipment create a safety
hazard. As compared to the latest (2002) edition of the NEC, the questionable breaker
disconnect of concern would only require an additional locking feature to eliminate the
reenergization of the circuit arid shock to an electrician that may be working on the
circuit. That is if the approved work was installed and sought for acceptance today.
This feature is a maintenance safety allowance not a fire safety consideration and
creates no substantial hazard warranting upgrade.
0 Incorporated August 11, 1890 0
Your concerns are-oddressed as such:
1 accordiqp to L&I, only fluorescent and high -density lighting circuits are
required%to have switch -rated circuit disconnects for switching duty. Circuit
d.is",' nects for heaters and motors apparently can be used as a means to
,pop
h and disconnect the equipment regularly from their power source.
EV6h �so, the pradtice of turning the heater off at the Port is not a daily
ot6uerencb, byi a6easonal event.
2) 1�§tglfatiq&,ap�pi&ed and accepted upon installation in 1969 per NEC (1968
edii,6n t
3) The "out-b I & I 6�quip*ment-site" location of the circuit disconnect was approved
and accepted in 1969. The 2002 edition would require locking feature to
assure that a circuit being worked on could be locked for circuit worker
safety.
4) 1 can think of no safety problems created by disconnection of heating circuits
in the spring and summer months.
5) The outstanding electrical permit you cite has to do with approved utility -work
at docks,N-0-P and nothing to do with the installation of your concern. No
inspecting agency to my knowledge practices issuance of "stop -work" on
unrelated work requiring corrections. Enforcement is the means to correct
valid problems that are existing and a cause of hazard.
Do not fear the Fire Department's culpability. As the fire safety authority having
jurisdiction and the local emergency services delivery agency, we are placed in
situations each day and everynight that require the utmost skills, expertise, procedural
awareness, and legal demands expected for the safe and professional delivery of all of
our services. We do take your concerns seriously, if that is your warning. I echo the
appreciation of your civic responsibility in reporting your concerns to us. Let me know if
you require further clarification or if I may be of any further assistance.
My telephone is (425) 771-0213 for that purpose.
I have included a copy of the L&I inspection report for your viewing and that you may
avoid the public information request requirement. . I
S,
r
John J. W/s
�ire Marshal
Cc: Fite Chief Tomberg
Building Official Jeannine Graf
MAY 29 103 08:37RI WASH L&I-EVERET.T IFL *o� 0 03. C`--7 06 0'7 P.2/2
Dqmmeru of Labor ft WwVia AGENCY REQUESTED INSPEMON
MAIL TO LOCAL L&I OMCZ
- gag LOCAL VIRRICTORY Plism pt� hard-3rd copy b P01114111
FOR AD . DRESS =33326 _j
Aferfil - Send compkIed request 19 wtd *k4VIM&*M q*U6
m obswg4
(v
S17 W) 0
ag" &Woe
xic AINC 4 L4. I I fw;,
50M *Ala 5 WA 9602,0 kRrrWcD &W R6 _L_
0I &WW -r"PWR4
FeAr &CME OF �Ml- IT-i-4* 040ezAc
334. A4>%41eA'L L#-I 4,1 VIOW.S-W,7r-�� W4C—V j6A(61W"-
civ am
C50L-I�5 wA e?8o2,o ff::a!Lat�&jev -/I .9c"-,--)1MoV6
jWj$MW vmakft foquM D�5.pt;^�FO FOC-7* tS
9WM26gj Ft" Mik S,46A2!�6a--S
A9110I MIUmS adilms
5-.j4 ? Wi"
12,; A -I IV
lb scm zP-4 q E30 W Aft?,4M IN A fb7C
Neatest wmin cmnead erAt Cilcol'ri0f
k). MYMAII0 Jr. IMA'd IMI, W
rA
A At
REPORT OF INSPECTION
only
needed Permit Required.
The datrical safety cor . rections listed below are harally'ordeved, 9111d must be compbad
within 13 days. Rckjr to National Elccwkal Code and SUW RuW for Standardii.
-7 " '11;!! _M
'-90 ale
A
. . . . . . .....
. - --Wff=7104 1 M-441E - - —
N 4 2003
Inspeowl8sump
P,
:3 Do NOT concul clectrical wo* prior Eo wWon—appz0val. jG2g)
psw.� samaym*wmatinicmdon s-99 white -permit Canw7-4spartment Cord-jobsille —
a MOJAW is
Message
Page 1 of 2
Westfall, John
From: Westfall, John
Sent: Wednesday, May 14, 2003 10:56 AM
To: 'Jeffrey Wilson'
Cc: Tomberg, Thomas
Subject: RE: New Fire Inspection Fees for Port
Jeff:
Permit fees will total $60 (for two permits) provided that locations and hazardous processes remain unchanged.
Multiple hazardous processes are allowed under a single permit and permits are provided for each process
location.
There are two permitted sites at the port:
336 Admiral Way, Port office and shop, including boatyard. Hazardous processes: Storage & handling of
flammable and combustible liquids and welding operations.
and
458 Admiral Way, Marina fueling dock. Hazardous processess: MV fuel dispensing and storage, sales &
handling of flammable and combustible liquids.
Please email or phone if I may be of further assistance.
John Westfall 425 771-0213.
----- Original Message -----
From: Tornberg, Thomas
Sent: Tuesday, May 13, 2003,12:00 PM
To: 'Jeffrey Wilson'
Cc: Westfall, John
Subject: RE: New Fire Inspection Fees for Port
Jeff- I do not. Fire Marshal John Westfall worked the 1000 PM to 6 AM schedule on TOPOFF 2 in Seattle, and will not be in
today. However, he will receive this email tomorrow and will respond with the amounts. Thanks. TT
----- Original Message -----
From: Jeffrey Wilson [mailto:JeffW(cD.MulvannyG2.Com]
Sent: Tuesday, May 13, 2003 6:53 AM
To: Tom Tomberg (E-mail)
Subject: New Fire Inspection Fees for Port
J
Chief,
R
Do you know how much the new fees (the ones we just passes) might cost the Port on an annual basis?
Thanks!
Jeff
Jeffrey S. Wilson, AICP
Senior Project Manager
5/14/2003 -
Westfall, John
From: Westfall, John
Sent: Wednesday, April 30, 2003 3:02 PM
To: Fire Dept Group
Subject: Port Standpipe System cks M & N
Members:
All docks are now provided with a viable standpipe system with the completion of M & N docks today. The standpipe is in
service. -
This includes the dock where ex -mayor Fahey's boat burned when she was in office. Hydrostatic test witnessed &
approved Fire System permit #02-988. There is no practical requirement for a redundant fire supply line down the pier.
The standpipe is made of high density polyethylene (HDPE) pipe which is corrosion -resistant in the hostile marine
environment. There is stretch to the line at firefighting pressures. The system is considered dry, yet is installed
submerged under the waterline with standing water in the run. This configuration avoids freezing/im pairing pipe.
The FDC for both docks is located on the float at the foot of the ramp. There remains one FD outlet to be striped to allow
for a visual i.d. by responders. The fire extinguishers will be mounted tomorrow. A schematic of the system will be
placarded at the FDC for our use.
FM
Message
Page 1 of 1
Westfall, John
From: Westfall, John
Sent: Monday, December 16, 2002 5:36 PM
To: Harrison, Marie
Cc: Bullis, Ann; Smith, Mike
Subject: Port Standpipe acceptance testing memorandum
Marie:
Here's the deferred memo to assemble with plans (after AB's approval)
John
12/16/2002
Date: December 16, 2002
To: Building Department
From: John Westfall, Fire Marshal9,
Subject: Plan Check #02-505: Edr Standpipe System
336 Admiral W
The Fire Department has approved the subject plans and provides the following for
clarification regarding system acceptance testing:
The proposal for installation of fire protection wet standpipe system is part of an
alternative materials proposal submitted by Mr. Bill Lehner, FPE of Lehner Engineering
on 1/30/99 (letter attached) for earlier phases of dock construction at the Port.
The Standard for the Installation of Fire Protection Standpipe Systems (NFPA 14-2000)
designates rigid wall metal pipe material for approved installations. Given the corrosive
and hostile marine environment and submersion of standpipe gystem in seawater,
flexible High Density Polyethylene (HDPE) has been approved for application on portions
of the system below the water line.
Because HDPE expands under internal pressure, an alternative means of hydrostatic
acceptance testing is required. The procedure will include pressurization to 220. psi for a
minimum of six hours. Hourly, the hydrostatic pressure will be brought up to at least 220
psi from the expansion and relaxed system pressure. Commencing the sixth hour, the
system shall maintain 200 psi for 2 hours.
Enclosure: Alternative Materials Proposal, letter dtd 1/30/99 from Mr. Bill Lehner.
Cc: Mr. Gary Watters, PN&D Engineering fax (206)624-1388
Mr. Chris Keuss Port Director 336 Admiral Way, Edmonds, WA 98020
City of Edmonds Sb Office of Fire Marshal
LEHNER V 18009 Highway 99, Suite C1, I Lynnwood, WA 98037
— en ineenn 425-776-7616, Fax 776-8�77, lehner@aa.net
FIRE PROTECTION SPECIALISTS File: 0158AItl.doc Job #0158.1 1/30/99
To: Bill Broz, P.E.
McGOWAN - BROZ ENGINEERS
12828 Northrup Way, Suite 200
.Bellevue, WA 98005
Fax 425-646-9843
RE: ALTERNATIVE MATERIALS PROPOSAL
Yort of Edmonds Marina Restoration
Edmonds, WA
Dear Mr. Broz,
Mr. John Westfall, Fire Marshal for the City of,Edmonds, has requested that I prepare, certify, and
submit a,formal proposal to utilize High Density Polyethylene (HDPE) pipe on portions of the standpipe
system on the subject floating seawater docks. The following constitutes this alternative methods and
materials proposal, prepared in accordance with the 1994 Uniform Fire Code (UBC), 103.1.2 and the
1994 Uniform Building Code (UBC), 104.2.8:
A. The source of the requirement for a standpipe system on the subject marinas is the 1994
Uniform Fire Code (UFC), Appendix 11-C, 6.2, which requires a "wet standpipe" system in
accordance with (Uniform Building Code) UBC Standard 9-2 and UFC 1004. UFC 1004 also
refers to the UBC Standards 9-2 (Standpipes) and 9-1 (Fire Sprinkler Systems), but the
balance of this section does not relate to marina type installations.
UBC Standard 9-2 includes about a half page of document reference revisions to (National Fire
Protection Association) NFPA-14, Standpipe Systems, and then the full text of NFPA-14 itself.
NFPA-14 refers to NFPA-13, Fire Sprinkler Systems, for some technical specifications.
B. Pipe materials are specified in UBC Std. 9-2, Table 2-2.1 to be steel per ASTM A135,, A795,
A53, or ANSI 1336.10. Ductile Iron per AWWA C151 ' and copper products are also specified, but
not used on this project. Hot -dipped galvanized steel as specified in Table 2-2.1 is utilized for
all piping above waterline on this project. Only that piping which is below water line is subject
to this alternative proposal.
C. The reason for this alternative proposal.is to utilize a product thlat is more suitable than steel to
the hostile marine environment along the docks. Seawat4r, especially in the splash zone and the
upper level of submergence, is very corrosive. It is capable of corroding galvanized schedule
40 steel pipe to a weakened condition, subject to operating pressure failure within 5 to 10
years after installation.
i,
D. The product recommended for substitution is High Density Polyethylene pipe and fittings. The
specific products utilized are Factory Mutual Approved for fire mains with a maximum working
pressure of 200 psi in underground (buried) service. Copies of the manufacturer's literature
expressing Factory Mutual Approval are attached in Exhibit A. The apparent reason that this
product is only approved for underground use is its increasing weakness with a rise in
temperature, page 5 of exhibit A. , The intended use of this product is very similar to that of an
undergrou ' nd service, in that it is submerged in about 6" of seawater at all times, where the
ambient temperature varies from about 38 to 480F. on an annual basis. HDPE piping is not
intended to be exposed to a fire environment.'
E. The following comparisons to steel, the Code:specified product are made as required by UFC
103.1.2 and UBC 104.2.8:
Quality (Suitability): The purpose of this pipe is to transfer water (500 gpm)'from ttie
Fire Dept. Conn. (supplied by the responding fire engine),along the floating dock to a 2.511
hose valve (for use by the fire fighter). Galvanized steel pipe has an inside diameter of
4.026" and a coefficient of roughness of 120 (Hazen and Williams formula from UBC Std.
9-1). HDPE Class 200 pipe -has an inside diameter of 3.364" and a coefficient of
roughness of 150. This equates to an overall hydraulic disadvantage for HDPE pipe. The
HDPE will lose 1.6 times as much pressure due to friction as the galvanized steel pipe at
the same flow rate. This means that a 500 ft. length of HDPE pipe will require an
additional 21 psi of pumping pressure from the fire engine at a flow rate of 500 gpm. A
pressure of 100 psi at the standpipe outlet will require a pumper pressure of about 175
psi with HDPE pipe and 154 psi with galvanized steel.
2. Strength: When new and not subjected to corrosion, schedule 40 steel is much stronger
than HDPE pipe. However, a few years submergence in seawater, or frequent exposure to
seawater spray causes corrosive pitting in the pipe surface, followed by rapid crevice
corrosion. This causes dramatic weakening of steel pipe, which must be replaced to insure
protection against failure during a fire incident. HDPE piping is virtually.' impervious to
seawater and its corrosive effects and to attack by marine organisms. Its service life is
well over 30 years (reference Exhibit B, "Chemical and Environmental Considerations").
3. Effectiveness: This piping material is Factory Mutual Approved for fire service water
main service if buried and thus protected from fire. By.being submerged, it is also
protected from ' fire. It is manufactured to block ultraviolet radiation so that exposure to
sunlight in shallow water does not cause deterioration. I have personal experience with its
successful installation and service at Port of Port Townsend, WA, for over 6 years, and
know that similar installations have existed in the City of Seattle for even longer.
4. Fire Resistance: This product, if exposed to a temperature of 100:�F., is approved for a
service pressure of 170 psi, slightly below the normally required 175 psi working
pressure of fire extinguishing systems. Its yield strength is approximately 50% higher
at 255 psi at that temperature. Therefore, this is the factor which determines that this
pipe material must be protected from fire wherever it is used as part of a fire
extinguishing system. Its submergence. in seawater alongside a floating dock is the solution
for protection from fire used in this instance.
Is
LEHNER V
engineenn
FIRE PROTECTION SPECIALISTS
To: Bill Broz, P.E.
McGOWAN - BROZ ENGINEERS
12828 Northrup Way, Suite 200
Bellevue, WA 98005
Fax 425-646-9843
18009 Highway 99, Suite C1, Lynnwood, WA 98037
425-776-7616, Fax 776-8577, lehner@aa.net
File: 0158A[tl.doc Job #0158.1 1/30/99
RE: ALTERNATIVE MATERIALS PROPOSAL
.Port of Edmonds Marina Restoration
Edmonds, WA
Dear Mr. Broz,,
Mr. John Westfall, Fire Marshal for the City of'Edmonds, has requested that I prepare, certify, and
submit a formal proposal to utilize High Density Polyethylene (HDPE) pipe on portions of the standpipe
system on the subject floating seawater docks. The following constitutes this alternative methods and
materials proposal, prepared in accordance with the 1994 Uniform Fire Code (UBC), 103.1.2 and the
1994 Uniform Building Code (UBC), 104.2.8:
A. The source of the requirement for a standpipe system on the subject marinas is the 1994
Uniform Fire Code (UFC), Appendix II-C, 6.2, which requires a "wet standpipe" system in
accordance with (Uniform Building Code) UBC Standard 9-2 and UFC 1004. UFC 1004 also
refers to the UBC Standards 9-2 (Standpipes) and 9-1 (Fire Sprinkler Systems), but the
balance of this section does not relate to marina type installations.
UBC Standard 9-2 includes about a half page of document reference revisions to (National Fire
Protection Association) NFPA-14, Standpipe Systems, and then the full text of NFPA-14 itself.
NFPA-14 refers to NFPA-13, Fire Sprinkler Systems, for some technical specifications.
B. Pipe materials are specified in UBC Std. 9-2, Table 2-2.1 to be steel per ASTM A135, A795,
A53, or ANSI B36.10. Ductile Iron per AWWA C151 and copper products are also specified, but
not used on this project. Hot -dipped galvanized steel as specified in Table 2-2.1 is utilized for
all piping above waterline on this project. Only that piping which is below water line is subject
to this alternative proposal.
C. The reason for this alternative proposal. is to utilize a product that is more suitable than steel to
the hostile marine environment along the docks. Seawat6'r, especially in the splash zone and the
upper level of submergence, is very cor,rosive. It is capable of corroding galvanized schedule
40 steel pipe to a weakened condition,' subject to operating pressure failure within 5 to 10
years after installation.
2
5. Durability: This product, HDPE, is composed of extra high molecular weight materials,
providing outstanding wear resistance to sand, coal, mine tailings, and other abrasive
slurries. These properties work throughout all the pipe material, inside and outside.
Therefore, abrasions against this pipe usually go unnoticed. Although this pipe is
suspended below the dock walers and inside their outside edge, at rare times a boat could be
backed into the dock in such a manner that its propeller could impact this piping. Such a
boat would have to be quite small for its propeller to contact the piping which is about 8"
below the surface. Such a boat propeller is not strong enough to disable the pipe,
especially since it is also flexibly installed. The' wall thickness of 4" HDPE is 0.568". A
cut 0.134" deep will reduce its effective wall thickness to that of Class 150 pipe, which
has a service pressure of about 175 psi at 400F.
Steel piping, after a few years and exposure to corrosion, is vulnerable to fracturing from
such a propeller impact due to its greater rigidity.
6. Safety: HDPE piping is certainly as safe for fire fighting operations as is steel pipe,
provided it remains submerged and not exposed to fire. It is not subject to weakening and
;unexpected failure due to corrosion over time. Additionally, because it deforms elastically
,(stretches) under pressure, it absorbs water hammer more readily than does steel pipe.
The present design with small pockets of air above the large volume main provide
additional surge chambers to absorb water hammer.
Another advantage over a deck mounted dry standpipe system is that most of the HDPE
system is already full of fresh water. This provides water to the fire fighter more quickly
and with less water hammer than a dry system.
7. Sanitation: Sanitation is not a factor in this alternative methods and materials proposal.
The possibility of seawater - or other contaminants backflowing into the public water
system is notaffected by the proposed standpipe arrangement, since it is a closed, high
pressure system.
I certify that the above information is true and correct to the best of my knowledge. The hose
connection between the fire dept. connection and the float piping supplying Docks C & D is not included
in this alternate methods proposal. Exhibit A (attached) represents details concerning the Factory
Mutual Approval of HDPE piping, and Exhibit B (attached) represents information about the resistance
of HDPE to sunlight and corrosive chemicals such as seawater. Please call me with any questions you
may have.
Respecfully submitted,
William B. Lehner, P.E.
Fire Protection Engineer
LEHNER ENbNEERING
0158AItl.doc
I "I
Westfall, John
Subject: 02-505 Port of Edmonds
Start: Fri 12/13/2002 10:00 AM
End: Fri 12/13/2002 10:30 AM
Show Time As: Tentative
Recurrence: (nohe)
Meeting Status: Not yet responded
Required Attendees: Bullis, Ann; Gruwell, Meg; Chrisman, Lyle; Westfall, John
Reminder consolidated review due, no meeting required.
Thanks
MI
Message
Page I of 2
1, `3 -5,4 Niu'14�L . �
Westfall, John
From: Westfall, John
Sent: Friday, April 04, 2003 9:20 AM
To: 'Hank Bynaker'
Cc: Tomberg, Thomas
Subject: RE: Port of Edmonds Marina Signage
Hank:
That makes sense to me. Thanks for the information and improving Port safety. Please call if I may further
assist.
John
----- Original Message -----
From: Hank Bynaker [mailto:hbynaker@portofedmonds.org]
Sent: Friday, April 04, 2003 8:17 AM
To: 'Westfall, John'
Subject: RE: Port of Edmonds Marina Signage
Hello John,
Thanks very much for the info. I'm going to incorporate the two items you mentioned into our sign.
On the other issue, my recollection is that all installed fuel tanks in boats must be grounded to a
grounding plate or disk in contact with the water. Some older boats have a black iron tank, but
most boats now have plastic or aluminum tanks. Grounding is required on all of them. It is
supposed to prevent a spark when refueling.
At this juncture, I'm not planning on including anything with respect to cell phone rUse while fueling.
Although I suppose it is possible that a spark could be generated by a cell phone, but quite frankly,
I'd be more worried about some of the higher powered VHF marine radios, especially older ones
with relays for switches. I think most of the problems will not appear so long as people exercise
care and caution while refueling and follow some simple rules like turning their engines off and
turning on the blower to ventilate. Again my thanks for your help John, as it is much appreciated.
Best Regards,
Hank
----- Original Message -----
From: Westfall, John [mailto:Westfall@ci.edmonds.wa.us]
Sent: Wednesday, April 02, 2003 5:25 PM
To: 'Hank Bynaker'
Subject: RE: Port of Edmonds Marina Signage
Hank:
Very interesting about the cellular phone use. I have heard of some urban legends about cell
phones igniting vapors at fuel filling stations. I know of no confirmed incidents locally or anywhere
else.
There are also stories circulating about fires caused from filling fuel tanks in truck bedliners. This
could have been cause with the voltage potential variation above in the flowing fuel and below the
insulated liner (ground) and creating a spark.
Tell me, are some fuel tanks ferrous metal and insulated through the hull from the "ground"
potential of sea water? I suspect if they are metal they will be grounded.
4/4/2003
Message Page 2 of 2
May I suggest for the signage that you add the last two points of the UFC signage to your existing
signage?
It looks good!
John
----- Original Message -----
From: Hank Bynaker [mailto:hbynaker@portofedmonds.org]
Sent: Tuesday, April 01, 2003 8:47 AM
To: westfall@ci.edmonds.wa.us
Subject: Port of Edmonds Marina Signage
Good morning John,
I am reviewing our current signage on our fuel dock and would appreciate your
recommendation as to how our new signage might read. I have included the text out
of the uniform fire code you faxed to me for comparison.
Our current signage reads as follows:
1. Stop Engines
2. No smoking or open flame permitted within 50ft of fuel dock
3. Do not overfill tanks or allow fuel to enter waterways
4. Do not leave vessel unattended
5. No moorage allowed on fuel dock
The uniform fire code reads:
WARNING
NO SMOKING -STOP ENGINE
WHILE FUELING. SHUT OFF
ELECTRICITY. DO NOT START
ENGINE UNTIL AFTER
BELOW -DECK SPACES ARE VENTILATED.
One thing I think our signage should include is something to the effect of, "Cell
phone use prohibited while ftieling."
Please contact me at your earliest opportunity at 425-775-4588 or by return e-mail.
Thank you very much for your help with this John. I want our signs to be the best
they can be.
Best Regards,
Hank
4/4/2003
D1r%
L-URT
OF
E D M 0 N D S
336 Admiral Way - Edmonds, WA 98020-7214 - (425) 774-0549 - (425) 774-7837 FAX
January 18, 2002
To: Edmonds Fire Dept
From: Port of Edmonds
Dean A. Kelley, CMM
Marina Manager
Re: Tier II report
As per Title 11 of the Superfund Amendments and Reauthorization Act 1986 1 have enclosed a copy of the
Port of Edmonds' Tier Il report for your files.
If you have any questions please contact me at the Port of Edmonds, (425) 775-4588.
Page I ' of I pages
Form Approved OMB No. 2050-0072
Facility Ident calon
Owneir(OP811101-14
-
aT 10-5-
Name or
Name I
Phone 7757-J2W
Tier Two
Street
MailAddress
EMERGENCY
city iEjP-,4,WS
County
State L444 zip 7'(0.2-0
Emergency Contact
AND
HAZARDOUS
SIC Code qq
3 Dun & Brad Number
CHEMICAL
Name
Title
INVENTORY
P hone
'77S Lyr-&t 24 tir. Phone
4
FOR
FID _#
Specific
PFFICIAL
Name
JiO'
Information
jJSE
Date Received
Phone
24 H.r. Phone
by Chemical
ONI-Y
Important: Read all instructions before copipletingform
Reporting Period
From January.1; to December 31, 19
11 Checl� if inforip.ation PP!P�y I§ i4poN.Pa! IQ th.9 i0pripOgn �Omig ol; yeair.
Physical
S
stprogg C;)Oq§ iiiind Locations
a
Chemical Pescription
and Health
.1n.ven.tory
U)
(Non -confidential)
C
.2
Hazards
2!
0 it, IL
E
S
0
(check all that apply)
rage Locations
Trade
CAS. Secret
Itr r1re
Max. Daily
Chem.Name 61', S., J,Q-e—
I I Sudden Release
kmount (code)
of Pressure
Reactivity
Avg. Daily Amount
Check all
that apply Pure mix Solid Liquid Gas EHS
Immediate (acute)
(code)
EHS Name
Delayed (chronic)
s- I No. of Days
On -site (days)
Trade
CAS Secret
j*-6re
Max. Daily
SV
Chem.Name
[I Sudden Relea se
___T_7F1 Amount (code)
F 0
7
of Pressure
Reactivity
Avg. Daily Amount
e
Check all
that apply Pure Kx Soiid Liquid Gas EHS
Immediate (acute)
(code)
EHS Name.
Delayed (chronic)
No. of Days
On -site (days)
Trade
CAS Secret
Max. Daily
Al Pye
Chem.Name M .0 1 IS
I I Sudden Release
Amount (code)
of Pressure
I Reactivity
Avg. Daily Amount
Check all I Woo� I I I
that apply Pure f4x Solid Liquid Gas EHS
Immediate (acute)
(code)
EHS Name
Delayed (chronic)
FTT-x a_j No. of Days
I
On -site (days)
Certification (Read and sign after completing all sections)
Option
I certify under penalty of law that I have personally examined and am familiar with the information submitted 'in Paws through 2- andthatbased
I I have attach9d p site plan�� -
on rDy inquiry of those inkidu2iS responsible fyVbt@i'ni*ng th�Flf
rmation, I believee submitted/'
ffa. s true, accurate, and co pi t
I I have attacheq a list 6 site coordinate abbreviations
A Ile-y
I) I have attached q cipscription pf qil�es an.0 other
Name and official fitle of owne//operdtor OR c
Sigiraiture-
—7- Date tigpdd
safegua
04 mowrpq
authorized representative
I 1
page �-_ of 7- pages
Form Approved OMS No. 2050-0072
Facility IdentAlcition
Name
Owner/ to ame.
Name V ?= j Phone 7 7
horr
C ;, .4u/S
Tier Two
Street 3 3 A -44-" tr-eL I
MailAddr'ess 33(. di,,yd
EMERGENCY
City 0 Iff County
State 41A- zip 71(0,7-o
Emergency Contact
AND*
HAZARDOUS
SIC Code �Pq 91 Dun & Brad Number
CHEMICAL
Name 1) 0- 41 #% ka lle-V Title Arresi-a Akqpeo-
INVENTORY
Phone q0,4- -7-?X-7-7jjS- 24 Hr. Phone I
FQR JID#
Specific
OFFIC!4
-Received
Name Title
formation
In
0§9 f5ate
Phone 24 11r. Phone
by Chemical
ONI-Y
Important: Read all instructions before completingforin
Reporting Period
From January I to December 31, 19
11 Check if information Pelbyy 19 iq@p§q1 to 09 inf9rrq.qpn p4milim 10§1 year.
Physical
C
Storogo Codg§ and �oc;itions
1i
Chemical Description
and Health
Inventory
a 0 a.
cc
(W-Ponfidential)
C
Hazards
C& D E
0 L
CL
(check all that apply)
I Storage Locations
CAS
Trade
J-15ire
Max. Daily
Al
Chem. Name
)erre,
Sudden Release
Amount (code)
of Pressure
I Reactivity
Avg. Daily Amount
Check all I I I I I I W I I
that apply Pure Mix
Solid Liquid Gas EHS
Immediate (acute)
(code)
EHS Name
Delayed (chronic)
I j 1 6 1 !�' I No. of Days
On -site (days)
Trade
CAS
Secret
Fire
Max. Daily
Chem. Name
I Sudden Release
Amount (code)
of Pressure
Reactivity
Avg. Daily Amount
Check all
that apply Pure Mix
Solid Liquid Gas EHS
Immediate (acute)
(code)
EHS Name
Delayed (chronic)
No. of Days
On -site (days)
Trade
CAS
Secret
Fire
Max. Daily
Chem. Name
Sudden Release
Amount (code)
of Pressure
Reactivity
Avg. Daily Amount
Check all
that apply Pure Mix
Solid Liquid Gas EHS
Immediate (acute)
(code)
EHS Name
Delayed (chronic)
I No. of Days
On -site �ciays)
Certification (Read and sign after completing all sections)
Optional A# n"
I certify under penalty of law that I have personally examined and am familiar with the information submitt d OW ough .21 andthatbased
I I I have atta0eq q Site plap.
on nq ry of those i vid?,jis
responsiffbl for obtaining the information, I believ a a submitted
inf 2nes acc urate, and co plete
I I have attached a list of site coordinate abbreviations
IK
i d
I I have attache.4 a.wScriptipp of diKes and other
Name and official title of own /operator OR owner/operator's Si ure
Y.
natp
safeguards Mpasurp4
authorized representative
I i
-� 56 N/Lf I k4L- K) Y.
EDMONDS FIRE DEPARTMENT CAUSE DETERMINATION REPORT
SNOCOM INCIDENT NUMBER FIRE/EXPLOSION CAUSE:
# EF 00-3025 ARSON
Tuesday, October 31, 2000 6:10
Occupant name: Port of Edmonds, Occupant phone: (425)0-0
Location: 456 Admiral Way
Owner name: Dan McGrew Owner phone- (206) 542-5570
FF injuries: 0 Civilian injuries: 0 Deaths--O
Occupant Insurance Co.: N/A Agent: Charles Blackburn
Owner Insurance Co.: Allstate Agentphone: Same
Estimated loss: $5,500.00
Fire department alarm time:
Fire officer:
Investigator notified:
Fire investigator:
Police:
Police officer: Steer/Roth
Photographs: Westfall
610 hrs Arrived:617 hrs
Capt. Marc Petrella
610 hrs Arrived:615 hrs
John Westfall, Fire Marshal
# EP 00-26632
Notified: 610 hrs Arrived:612 hrs
Evidence: NOT APPLICABLE
INVESTIGATORS CONCLUSION:
Arson fire identified from physical remains of boat and scientific method used to eliminate all
accidental sources of heat production within area of origin.
DISPOSITION: Open, active
WEATHER CONDITIONS:Approximately low 50's F., overcast
DESCRIPTION OF PREMISES:
1976 20'Bayliner Boat, registration (WN5330JE), BIN (BLBA38LB087). Boat built with fiberglass
hull & wood framing members. The boat was powered with a single gasoline inboard engine and
drive. Aft of the cabin was a canvas cover which enclosed the rest of the deck area. A photo of
owner Dan McGrew and his boat is attached.
EXTERNAL EXAMINATION:
Boat docked at slip M12 in central docks at Port of Edmonds. The bow was facing north into the
slip and was tied on the starboard side. Boat was m ' ost burned on port (pier/outboard) side near
to waterline. The boat cabin had been reduced from fire to a level at the top of hull. Hull shows
"V" pattern aft of cabin area. The boat was extinguished by suppression crews and did not sink.
At the slip area, the outboard auxiliary engine was recognizable at the bottom from the surface.
The outboard engine had been mounted to an aluminum bracket which had melted and failed,
allowing the engine to drop to the bottom. A red polyethylene 6-gallon gasoline con er which
Fire Origin and Cause Determination Report
Edmonds Fire Department Fire Marshal 16 John s all
3-36, POM-A4L- L-'-,Y
Westfall, John
From:
Tomberg, Thomas
Sent:
Thursday, November 16, 2000 5:09 PM
To:
Fire Officers
Cc:
Taylor, Kevin
Subject:
Scuttling a Boat
11/16/00
ABC Schmitt and Officers: Lyn Gross just advised the Coast Guard received information that the owner of a boat moored
at P dock may try. to scuttle it. Apparently, it is an older 26' Fairliner berthed between the Nea and the Sugarfoot. Port
Security person Andy was notified by me at 1705 hours. Lyn notified SNOCOM who notified EPID prior to that. I advised
Andy to contact both the Coast Guard and the EPD. We could have a hazmat problem, or no problem because nothing
may occur. The proper law enforcement authorities have been notified. TT
1i
F.D. 2000-106
NOTICE
DATE: September 18, 2000
TO: ALLPERSONNEL
SUBJECT: PORT OF EDMONDS PROTECTION ISSUES
In concert with Fire Department requests following last December's boat fire and subsequent
shift input regarding Port emergency responses, the Port has met our requests for better sign -
age and identification to aid Fire Department responses in that area.
For "N" dock only (south of Port Office), attempts to repair the broken standpipe as a result of
the fire have not been satisfactorily accomplished. The "ell" where the dock takes a turn had
been replaced with PVC pipe, which will not withstand our operating pressures for use. Up-
grades to all dock utilities for "N" in 2001 will include replacement of the existing standpipe with
approved HDPE pipe.
"The gate for each dock will be provided with signage identifying the docks served and their in-
dividual length to assist the IC during size -up. The dock length will be measured along ap-
proved walkways from the sign location (gate) to the end of the dock(s). " Note the slip identifica-
.tion signage on the right.'
F.D. 2000-106
"Gritted white or reflective striping will be painted on the dock at standpipe outlet locations for
rapid identification."
Thomas J. Tomberg
Fire Chief
Pull Date: December 31, 2000
By: FM Westfall
Date:
To:
From:
Subject
EDMONDS FIRE DEPARTMENT
February 151- 2000
Ch. Tomberg, AC Taylor, Capt. Schmitt
B shift members. prepared by Lt. D. Oftedahl
I.D. MARKERS AT THE PORT OF EDMONDS
After completing our wet hose drill at the Port of Edmonds on Feb. W we had a discussion on
potential scenarios that could anise and how they could be handled. In discussing these scenarios,
one common denominator stood out. And that was identification. Here are some examples:
1. Hydrant location (map book)
2. Fire Department Connection location for the dock standpipes.
3. Which dock/docks a re se* rviced by which FDC.
4. Location of standpipe connections on pier.
5. Length of each pier.
A suggestion was made that would make this *information easily accessible to any engine company
responding to a fire at the Port.
Have signs giving this information placed on the top rail of the fence directly *in line with the actual
FDC down on the dock. '
The sign would have a red back ground with F D C across the top.
The second row would have the letter/s of the dock/s that that particular FDC services.
The third row would show the length of the each dock.
Another suggestion that would enhance ID would be to identify the location of each standpipe out
on the docks. That could be done by painting a red hydrant on the concrete deck or by placing a
blue hydrant marker on the deck right in front of each stand pipe. Or do both.
Dennis Oftedahl, Fire Lt.
Date:
To:
From:
Subject:
I
EDMONDS FIRE DEPARTMENT MEMORANDUM
April 28, 2000
Port File
Fire Marshal Westfall
Various Port Issues
Present: Tomberg, Westfall, Deputy Executive Port Director Chris Keuss, Port Maintenance
Supervisor Bob Yeager.
Damaged/Impaired Fire StandpiQe, N Dock:
N Dock was the scene of December 1999 boat fire during which the standpipe system failed.
The break occurred at the 90-degree turn on the L-shaped dock. Yeager will repair the break at
the 90 degree-L. Yeager requested a pumper test the repaired section for evaluation and
acceptance.
Approximately one year from this date, utility upgrades to M and N docks will include full
replacement of the existing Steel/PVC system with approved HDPE standpipe construction.
Fire Department Identification and Signage
The gate for each dock(s) will be provided with signage identifying the docks served and their
individual length to assist the IC during size -up. The dock length will be measured along
approved walkways from the sign location (gate) to the end of the dock(s).
FDCs identifying the dock(s) served will be signed.
Gritted white or reflective striping will be painted on the dock at standpipe outlet locations for rapid
identification.
Standpipe outlets will be striped with reflective material.
Port Multi -Purpose Boat
Keuss provided a manufacturer's flyers on public safety rigid hull vessels (SAFE Boats, Pt.
Orchard). This information will be forwarded to FF White who will identify FD needs and
specifications for a vessel. The Port is willing to consider EFD needs regarding length,
accommodations, etc. Lengths of 20', 22', 24'and 27'feet were mentioned. A brief mission
description identified fire suppression, fire pumping capability, rescue, law enforcement body and
evidence recovery, towing, a cabin, room to treat patients in a shielded area, equipment storage,
and protecting patients and crew from the elements. The Port would retain their work boat for in -
Port activity.
Keuss asked EFD to generate field trips locations to see multi -purpose vessels.
City of Edmonds Sb Fire Marshal
10
Wesffall, John
From:
Sent:
To:
Subject:
'3 3'C.
Schmitt, Bob
Friday, May 05, 2000 5:01 PM
Westfall, John
Port test
A, ry
0 M I Ali� ""4
FYI, we attempted to test the system today but the 2 1/2 hose/standpipe connection broke about 4 minutes into the test (at
200 lbs.). Bob was with us and will let you know when it is repaired.
Wesffall, John
From:
Westfall, John
Sent:
Monday, May 01, 2000 5:14 PM
To:
Schmitt, Bob
Cc:
Tomberg, Thomas
Subject:
Port test
I need your help during the day when your schedule allows. Bob Yeager has completed standpipe repairs on N dock
down at the Port. This is the dock where Mayor Fahey's boat was berthed when it burned, and the standpipe system blew.
We agreed we should test the system with an Engine. I'd like you to call or meet up with Port Bob at 425 774-0549 and
bring the engine down. Provide a practical standpipe test by pressurizing the pipe to 200 psi for: 10 minutes. Letmeknow
how things go Thanks.
Lo .0i
MEMORANDUM
Date: April28,2000
To: File
From: Fire Marshal Westfall
Subject: Port Meeting Regarding FIR System 336 Admiral Wy
Chief Tomberg, Chris Keuss Port Facilities rep, Bob Yeager Port Maintenance Lead, and myself
met this date to discuss pending issues, as follows:
Dama-ged/impaired fire standpipe at N dock:
N dock was the scene of December'99 boat fire at which the standpipe system broke. N dock is
an "ell" -shaped pier. The break occurred at the 90-degree turn.
Bob Yeager will repair "ell" section of standpipe system presently, requesting FID pumper hydro
test for acceptance/evaluation.
Approximately one year from this date, utility upgrades to M and N docks will include full
replacement of existing Steel/PVC systems for approved HDPE standpipe construction.
Fire Department identification & signage
The gate for each dock(s) will be provided with signage identifying dock length to assist IC during
incident sizeup. Length provided will be measured along approved walkways from the sign
location to the end of dock(s).
FDCs identifying the dock(s) served will be signed.
White or reflective striping will be laid on dock at standpipe outlet locations for quick identification.
Standpipe outlets will be striped with reflective material.
Port Multi-i)uri)ose Boat
Chris provided a manufacturer of rigid hull vessels.
will identify FID needs and specifications for a vessel
vessel length, accommodations, etc...
cc: Chief Tomberg
information will be provided to FIF White, who
. Port is willing to evaluate our needs for
City of Edmonds Sb Fire Marshal
CITY OF EDMONDS GARY HAAKENSON
MAYOR
121 - 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0215 * FAX (425) 775-7721
FIRE DEPARTMENT
1"7 C. 1 SWI
March 14, 2000
Bill Toskey, Executive Director
Chris W. Keuss, Deputy Executive Director
Port of Edmonds
336 Admiral Way
Edmonds, Washington 98020
i
Dear Bill and Chris:
Thanks for the opportunity to meet on Wednesday, March 15 at 1000 a.m. I wanted to
briefly outline some of our issues to facilitate tomorrow's discussion.
Upgrading the standpige system. The standpipe system serving docks 1, J, K, L, M and
N requires updating per the 1997 Uniform Fire Code. During our Port drills on February
7, 14 and 21, we identified a leak in the new standpipe system at the base of the Fire
Department connection (FDC) serving docks E and F.
Emergency Equipment Storage Shed. We understood a storage shed would be
constructed adjacent to the Fuel Dock building to house the Mustang survival suits worn
by Firefighters whenever they staff the boat.
Flare Off. The Flare Off event, coordinated with the United States Coast Guard, is
scheduled to be held at Marina Beach on May 20 as part of the Waterfront Festival.
Portable Fire Extinguisher Live Fire Training. You have received Fire Marshal John
Westfall's letter regarding unsupervised fuel dispensing training for Port employees
dated February 24.
Marking Critical Public Safety Features. We would like to explore ways to identify
critical public safety features of the dock system that would be of great assistance during
emergency incidents, particularly at night and under adverse weather conditions. These
recommendations stem from our experience fighting fires at the Port and our most
recent series of February training drills.
9 Paint Fire Department Connections (FDC) with reflective paint.
Paint a 3" to 4" stripe across the dock at the location of each FDC and/or mark each
location with a blue reflective hydrant marker.
Indicate which docks are served by each FDC and the length of each. Please
see an enclosed copy of signage posted at each dock entry gate as an example of
what would greatly assist responders during fire fighting operations.
Incorporated August 11, 1890
Sister City - Hekinan, Jap6n
SUBJECT: Port Meeting
March 14,'2000
Page 2
Port Boat. We would like to see a new Port boat purchased to enhance the ability of
Firefighters to safely perform ' water rescue and extinguish boat fires. We broach this
subject recognizing the City has not budgeted for either of these purposes and that
funding and maintenance costs would come from the Port. Nevertheless, we feel we
have an obligation to identify shortcomings in the current emergency response system
and to make recommendations to improve the fire and life safety of Port users and the
rescuers who come to their aid.
We believe the current Port boat provides a good work platform for the type of activity
required by Port employees, however, it has deficiencies when used in a rescue or fire
fighting role which includes:
1 . Drop bow
2. Lack of handrails
3. Lack of shelter to protect rescued victims and crew from hypothermia
4. Lack of lighting
5. No fire pump to deliver suppression water from the Sound side of a burning
vessel or in open water
6. Under powered
7. Deficient navigation tools under adverse weather conditions and darkness
8. Lack of protected storage (would not have to construct shed for Mustang suits)
9. Lack of a tow bit and tow bridle
10. Lack of working space exacerbated when rescue victims are taken on board or a
I backboard is required to transport an injured victim
11. Restricted gross carrying weight of 1,500 pounds
12. Lack of access if the single Port boat is in use or unavailable
The Fire Department would like to see the Port of Edmonds acquire a fire and rescue
boat that is available to Edmonds Firefighters to train on and respond to emergency
incidents in the Port and outside up to a reasonable distance. The Fire Department is
not interested. in a trophy vessel equipped with the latest bells and whistles. We are
interested in a safe vessel that is functional and. gives Firefighters the best opportunity to
suppress boat fires and rescue people in distress.
Thank you for reviewing this information prior to our meeting on Wednesday.
Sincerely,
Thomas J. Tomberg
Fire Chief
Enclosure