=6 ADRUZAL WAY August 6,196
EDMONDS.WASHVGTON98020-7214 Viss
(206)774-0549 %rnss
PAX (206) 774-7837 sv�',--
jAtA%I"k rj0IR
co ;0�
VI
Burlington Northern Railroad Co. GATX Corporation
c/o Registered Agent c/o Registered Agent
C.T. Corp. Suste, C.T. Corp. System
520 Pike St 520 Pike St
Seattle, WA 98101 Seattle, WA 98101
John Levin William Joplin Company
Asst. General Counsel, GA7X Corp. 13406 19 V Ave SE
500 West Monroe Monroe, WA 98272
Chicago, IL 60661
Re: Notice of Environmental Contamination - Harbor Square Property
Dear Registered Agent:
The Port of Edmonds hereby provides notice of a release of hazardous substances on property owned by the Port of
Edmonds, Washington. 7he Port previously notified the Washington Department of Ecology and Unocal
Corporation, and we understand that Unocal provided noti . ce to GATX and Joplin. Each of you is receiving this
letter because you may have potential liability associated with the property.
The property is located in the 100 block of West Dayton Street in Edmonds, Washington. Harbor Square Associates
leases the land from the Port and owns the buildings and other site improvements. 'Me Port purchased the property
from Union Oil Company in 1978. The property. is located near the crossing of a Burlington Northern Railroad line.
Union Oil had leased some or all of the property to Great Northern Railway in 1945. It reportedly was used by
Great Northern Railroad and Burlington Northern Railway until 198 1.
The Port understands from Unocal that a predecessor to GATX Corporation leased the property from Unocal to
operate a railroad car tank cleaning and maintenance facility located on a railroad spur track on the property.
GATX apparently constructed some buildings on the site and conducted its business utilizing the railroad spur.
Unocal apparently entered into an agreement with GATX and Great Northern Railway, which approved of the
GAIX operations. In 1950, the GATX operation was expanded, an additional railroad spur was constructed, and
the agreement among Unocal, GATX and the Railway was amended. GATX apparently operated at the property
until December 1963.
Ile Port also understands from Unocal that Unocal entered into a lease in 1958 with Earl L Joplin, dtb/a Joplin
Paving Company, for the operation of an asphalt hot -mix facility on property fronting on Dayton Street, to the east
of the GATX operation. Joplin apparently continued operations on the property until 1968.
The Port discovered a release of hazardous substances at the property on October 9, 1991, when a laboratory report
containing the results of a limited soil sampling and testing program showed the presence of total petroleum
hydrocarbons in excess of Model Toxics Control Act Method A cleanup standards. This release was reported to the
Department of Ecology pn January 3, 1992. Results of an expanded program of Soil explorations and groundwater
monitoring well installation and.sampling indicatedareas of.potentiia.coneem on -site. Ihe por
A has -incurred
approximately. $55,000 in costs on a, Sampling program, Phase I environmental assessment, other investigations at
the site, and . legal fees. The Port anticipates incurring additional costs in the future related to the remediatioli of the
site.
Ile Port is not making a demand against you at this time, but is notifying you of the Contamination and the
possibility that you may be potentially liable for costs incurred or to be incurred by the Port. The Washington
7 ' 7
(fu0mmunity services, 250 5' Ave N, Edmonds, WA 98020)
Richard D. Tackett� Unocal
(11720 Unoco Road, Building D, Edmonds, wA ggo2o)
Cl) LL
0
LL
T
U!
3:
z
z
LM Lli
0
LU
3:
M�
Mi
AV
... . ........... ..
cc
U)
U) W,
Lu
-i
(1) LL
LU
It
D cl
z
z
LM LU
U U)�
0;7
cl
LU
UJI
LL 0
.. Zi
LU U)
0
z
to
C: 7�-
.. .. . ..... ..
.. . . . . . . . . .
ec
. . . . . . . . . .
-7
71
0
PORT'
OF
E 0 9 0 N D 5
63SAVAIMALWAY August 14, 1996
IMMONESMASMOTION98020-7214
(206)774-0549
Z
PAX (206) 774-7837
LU,
Cr 2:
Mir. JeffTey S, Wilson
< :)�
LM C3,
City of Edmonds
0i
Community Services Department
(n
250 5" Ave N
LU 3:
Edmonds, WA 99020
(f) LL
0
Dear Mr. Wilson:
-J
U- <1
This letter is in response to your letter of August 7.1996, subject "Comments on Environmental
Detannination for the Proposed New Dry Stack Storage Facility and Marina Improvements". This
T LU!
letter is also a follow-up to a Icttrr submitted by Makers on behalf of the Port of Edmonds dated July
Z
17,1996 which contained the Application for Shoreline Silbstantial Development rermit� SEpA
�- 0;
Z 1--:
Checklist, legal descriptions, Adjacent Property Owners Checklist, Critical Areas Checklist, City of
LU UX
Edmonds Environmental Asiessment, Port of Edmon& Mitigated Determination of Nonsignificance,
U (n, 11
and preliminary Architectural Design Board approval. 71tis letter is also a follow-up to our recent
0 —
discussions related to the Port orEdmonds application for a height variance rela to a stack storage
Ted
a
LU LU
facility at the Port of Edmonds.
IL 0�
As you requested in your August 7 lefter, the Port of Edmonds is withdrawing its Environmental
Z
Determination as originally i33U*d on July 22,1996 fbrthc new dry stack storage facility. 77WP*rtof
Edmonds will also prepare appropriate environmental documents related to the latest version of the
0
Port Master Plan, We are already committed to worldng with the City to ensure that the Fort's Master
Plan is compatible with the City's Comprehensive Plan and that any areas of disagreement are
amicably resolved. The Port is committed to developing a dry Mack storage project which is Uly
consistent with the current City Comprehensive Plan and documentation related to this project wHI be
presented to the City within the next two to six weeks. The Port will also resubmit its application for a
dry suck storage project that addresses all of the concerns of the City staff as well as the applicable
concerns of various citizens. We will specifically address Marina Beach parking, traffic impacts,
overall Fort parking, and stream impacts.
As agreed on August 14. 1996, the Port will provide draft copies of each application, permit analysis,
0
or other appropriate document to the City stafffor its consideration prior to official submittal, The Port
is cornntitted to working cooperatively with all elements of the City staff on this and other significant
Port projects. I request am the City staff contact me if thcy have any que3tioas or concerns related to
any issues contained in this letter or in relation to other projects or Information contained within
various Port plans or documents.
10
Sincerely,
A
,V%krrdH
Wi litw
SKeoutive Dire
0
�q ,
-A
61:A
232703-1-045-0004
232703-1-057-0009
232703-4-003-0008
ESC Associates
Burlington Northern Railroad Co.
Harold R. Stone & L. Ardean
3131 E. Madison St, Suite 202
777 Main Street
14277 Worden Way
Seattle, WA 98112
Fort Worth, TX 76102
Saratoga, CA 95070
2327034-011-0008
2327034-013-0006
Union Oil Company
2327034-012-0007
Margaret B. Vorwick Trust
P.O. Box 7600
Port of Edmonds
do Brice Inv. Realty
Los Angeles, CA 90051
Edmonds, WA 98020
9450 SW Commerce Circle
Wilsonville, OR 97070
2327q3-t-014-0005
Port o&Fdmonds
2327 -4-0,64-0004
0 onds
0�
23274.3-.4,-075-0001
Port SWdmonds
Edn)dnNs, WA 98020
WA 99020
Edrdon&, WA 98020
2 2703*44-094-0008
3
2327,03-,04086-0008
ort Odmonds
'1 0 f
Ci of onds
ivi e
Civi enter
2327 3
1 -0005
rtK
P 0 0 nds
dru6nN WA 98020
So
25 i AvenueN.
L
E nds�WA $020
9
E 0 M
oCnWA 98020
DV031-153-0006
mo
C 4,lyd ads
25 Aven e N.
0 ut
23*34-158-0001
Po . NZIEdmonds
r5Iq
,
23270-\4-JA-0000
Portof Nonds
E on WA 98020
-
E�non WA 98020
Vs
Edmolf, VA 98020
I , —,
Jon l ee Nunn
John Judy Lavallee
Jim King
520 6th Ave. S.
7504A 210th St. SW
713 Laurel St.
Edmonds, WA 98020
Edmonds,.WA 98026
Edmonds, WA 98020-4027
Arthur Lowell
Bob VanCitters
200 2nd Ave. N. #302
Edmonds Marble-& Granite Co.
Edmonds, WA 98020
15105 Highway 99
Lynnwood, WA 98037
232703-1-045-0004
232703-1-057-0009
2327034-003-0008
ESC Associates
Burlington Northern Railroad Co.
Harold R. Stone & L. Arden
3131 E. Madison St, Suite 202
777 Main Street
14277 Worden Way
Seattle, WA 98112
Fort Worth, IX 76102
Saratoga, CA 95070
2327034-011-0008
2327034-013-0006
Union Oil Company
2327034-012-0007
Margaret B. Vorwick Trust
P.O. Box 7600
Port of Edmonds
c/o Brice Inv. Realty
Los Angeles, CA 90051
Edmonds, WA 98020
9450 SW Commerce Circle
Wilsonville, OR 97070
2327q3-t-014-0005
Port o dmonds
2327V-4:064-0004
Port: ofqdmonds
232703- ",75-0001
Port Oirdmonds
Edn) n s, WA 98020
WA 98020
Edrdon&, WA 99020
2 2703-4-094-0008
23��3
of
Ci of onds
2327 '3-000'
�j86-0008
Port dXE onds
Civi enter
'ivi
P rtK
0 onds
Edr
y6nak, WA 98020
25 1 Avenue N.
So - Al
EL nds�WA 98020
, E 0 M
onCWA 98020
23VO3-$-153-0006
C1 dmo
23XO,34158-0001
23270,"-0000
21504 Avenue N.
P Edmonds
Port o" FJjnonds
E on , WA 98020
0 WA 98020
EdmT(as, NVA 98020
3nn1an td"nn
Inhn A 3"d I numl Ian
14- V4-
520 6th Ave. S. 7504A 210th St. SW
Px Edmonds, WA 98020 Edmonds, WA 98026
0
z
Arthur Lowell Bob VanCitters
200 2nd Ave. N. #302 Edmonds Marble & Granite Co.
Edmonds, WA 98020 15105 Highway 99
Lynnwood, WA 98037
0
Page 2 of 2
232703-1-045-0004 232703-1-057-0009 232703-4-003-0008
ESC Associates Burlington Northern Railroad Co. Harold R. Stone & L. Ardean
3131 E. Madison St, Suite 202 777 Main Street 14277 Worden Way
Seattle, WA 98112 Fort Wort)4 TX 76102
Saratoga, CA 95070
Uj;
2327034-011-0008 232703-"13-0006
Union Oil Company 2327034-012-0007 Margaret B. Vorwick Trust
0! P.O. Box 7600 Port of Edmonds do Brice Inv. Realty
LU; Los Angeles, CA 90051
Edmonds, WA 98020 9450 SW Commerce Circle
Wilsonville, OR 97070
U.
0
2327Q34-014-0005 2327V-4-064-0004 23270,3-�,-075-0001
Port oVdmonds Port owmonds Port qWdmonds
M Edrq�h�s, WA 98020 mpfidk, WA 98020 Edm-on&, WA 98020
ca)
LUI
0' 2:�27�0�3t4-094-0008
2327,03-,0086-0008 monds
f 2327 13-0005
ort Wdmonds oy r 0 tK
LU
Port onds
0 �(
drp6nak, WA 98020 250 i Avenue N. Ed n nds, WA 98020
on
WA 98020
;7-
LU 2��7034-153-0006
�j
d'non 23XO,34158-0001 23270,,4�-0000
2 5 04 A v e ndusee N. PortEdmonds Port of onds
z!
E on WA 98020 e. ft
T: E2ffion4s, WA 98020 EdmTfI , 1WA 98020
Jonl ee Nunn John Judy Lavallee Jim King
520 6th Ave. S. 7504A 210th St. SW 713 Laurel St.
Edmonds, WA 98020 Edmonds,.WA 98026 Edmonds, WA 98020-40?7
Arthur Lowell Bob VanCitters
200 2nd Ave. N. #302 Edmonds MarbleI Granite Co.
Edmonds, WA 98020 15105 Highway 99
Lynnwood, WA 98037
-iV �-i
T
k5
P
0
LU
W
U) LL
10
2 �:
9-1
U.
Ln
0
U,
z
�_ 0
Z I
LAJ LLI
0-
U
L
2
UJ (J
0
z
t 0
1:=
Isamonds, WA 98020-7214
SR-104 M.P.24.68 Vip. C.S.3130
Traffic Study Review For The
Port of Edmonds South Harbor
Master Plan
Dear Mr. Toskey,-
We have reviewed the traffic study you sent us for this
proposed port expansion project. This expansion project
will add 15 new PM peak hour trips and 125 new average
weekday trips to the area's roadway system. To mitigate
these traffic impacts we recommend the port agree -to
participate in the funding of the City of Edmonds Multi -
modal project. This project includes relocation of the
ferry terminal and it's.traffic flow.
Thank you for the opportunity to offer our comments on the'
traffic study for this port expansion project. Should you
have any questioins, please feel free to contact Don Hurter
(440-4664) or Ed Giraud (440-491�) of my Developer Services
section.
* Si e'
OB RT HSON, P. E.
Manager o Planning
L Loc 1 Co�� ti
ocal Cog dination,
RAJ:elg
City of Edmonds
0
EEG I
CITY OF EDMONDS
BARBARA FAHEY
260 STH "ENUE NORTH . EDMONDS. WA 98020 - (206) 771-0220 0 FAX 1206) 771.0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works Planning Parks and Recreation Engineering
Mailed 7/26/96
July 26, 1996
Sherman Goong
Perteet Engineering, Inc.
2826 Colby Avenue, Suite 410
Everett, WA 98201
Subject: Traffic analy4is )r PbrtvffAMQnd1
Dear Sherman:
I have received your analysis on trip generation for the Port of Edmonds dry
stack and beyond., I reviewed your methodology, and it appears logical and
comprehensive. As we discussed, however, I cannot make official comments on
the analysis until there is an actual proposed development At this point the City
has not received the necessary applications. I will place the study in a temporary
file and do a thorough analysis at the time of SEPA review. Thank you.
Sincerely,
31�
Ir
Gordon C Hyde
Engineerin *9 Coordin2o/r WallWr
GCH/sf
PORTTFC.DOC
0 Incorporated August 11, 1890 &
Sister Cities Internadonal — Hekinan, Japan
0
Project pbx�r s��t�oj.) r>--�
Subject
Catc. By
Date
Chkd By
Date
:r-"F- 40 A-1-s-r
r
Azo
MM) &0
0
3-11 cc)
0
�S7
-2-
-2-
4
PHASRS-) YCA-C.
wer 4"
i?o
Act
(2- PfaoZ^ev---r e-o rvx P LVn o PA
157
4-Tk=rr---
.. ..........
--I L
2— A-Xcl-tclt-�'S-
C>
(t-rE-- -7%0
t- IA-
Z 70
too
P-m-rA.LL— Sp-p'e-c� 6-ce
2--
ay
Pkcp-V_ .
115 ( t
.
Pmject
Subject
Calc. By <
—Date
Chkd By
Date
%ep-r, c:..s7
2-7-f.
pAlaw-
3,
4VN$e R-AC-VMI> 86 Y 12-
1 -2.
-s"e couiz-r Fov-- Pvr-r tmf=o
werr
A*7-4:;l S, C.0 0
Koo ea 0
NL%T--rR IsArs-ip-�- --Boo 0
-a, J�,o I t 4cp
�-7ro.-J-MF- MA P zollol/-we
Z�A(o o-k-w-
PYA SOS-. vs--,o-tj,
C/)
rn
9
mr-�
Uj
z
0
!j �-
LM Uj
0-
n i,-
LU
LL.
LU (1,
0
z
KIM
to
Traffic
Data Gathering
Location:
Entran ce to Marin Beach
Park
114110 -
13th Street SI.E.:
Site:
95-165-01
Weather
Rainy,
Lake Stevens.
WA 98258
Date:
09128/95
Counter
14
File:
[none]
Interval
S8
N8
COMBINED
Day
Thursday
Begin
AM
PM
PM-
AM,
12:00
0
0
13
0
0
3 12
01
0
4
25
MIS
0,
2
4
12:30
0
51
0
4
9
12:45
0
5
0
3
0
8
1:00
0
'0
6
30
0
0
8 32 ,
0
0,
14
62
1:15
0
6
0
4
0
10
1:30
0
8
0
8
0�
16
1:4S
2:00
0
0
10
0
12,
0
:22
0
10
33
0
0
10 33
0
0
20
66
0
6
-
0
3
0
9
2:30
0
8
0
10
0
2:45
a
9
0
io
0
19
3:00
0 ,
0
9
25
0
0
11 31
0
0
20
56
3:15
0
7
0
91
0
i6
3:30
0
7
0
7
0
14
3.4S
0
2
0
4
'0.
6
4:00
0
0
4
18
0
0
8 24
0
0
12,
42
4:15
0
-
6
0
10
0
16
4:30
0
6
0
6
0
12
4:45
0
2
0
0
0
2
5:00
a
0
4,
15,
0
0
4 19
0
'0
'8
34
5:15
0
6
0
6
0
12
5:30
0
1
0
5
0
6:
SA
0
4
0
4
0
8
6:00
a
4
17
0
0
3 11
0
0
7
28
6:15
0
2
'1
3'.
6:30
0
6
0
3
0
9
6:45
5
0
4
0
7:OD
8 .
6
18
—0
5-'.
8 30
1
13
:9
14
48
7:15
0
2
11
2
16
7:30
2'
3
2
4
7:45
5
6
8
8
14
8:00
18
0
41
9
18
2 8
11,
36
2
12
8:15
6
8
2
8:30
4
2
9,
2
13
.4
8:45
2
'0
1
2
.3
4
4
9:00
6
8
1 11
6
14
2�
9:15
3
2
.6
1
1
3,
9:30
1
3
1
4
2
7
9:45
2
5
0
5
2
10
10:00
7
is
:0
0
3
is
0
10,
30
0
o
10:15
3
0
0
8,
0
10:30
4
4
0
8
0
10:45
1
0
3
0
4
11:00
2
�9
4
4
1
7
3 3
,
3
W
:,7:
7
11:15
2
0
3
o
5
0
11-30
1
0
1
2�
OL
11:45
4
0
2
.6
0
Totals
56
188
53
109
�402
Split x
51.4
46.81
48.6
53.2
Day Totals
�244
267
Day Splits
47.7
52.3
Peakliour
7:45
1:16
7:45
2:30
7:45
':2:30
Vol we
21
34
40
AD
7 3
Factor
0.88
0.86
0.53
0'.91
'0 77,
0.91
JANUS Raw Data File:
Page 2
9516502
Printed: 09-30-1995
Traffic Data Gathering
Location:
Admiral
Way Anthony Edmonds 11410 - 13th Street S.E.
Site:
95-165-01
Weather
Rainy
Lake Stevens. WA 98258
Date:
09/28/95
Counter
16
File:
[none3
Interval
SB NB COMBINED Day
Thursday
Begin
AM
PM AM PM
Pm
z
<
12:00
1
4, 11 48 1 2 8 41 2 6
19 89
mr
12:16
a
1 8 0 12
20
12:30
1
16 - 0 14
30
cc
12:45
2
13 1 7 3
20
;5
1:00
0
5 14 59 1 3' 16 61 8
30 120
d 0�
1:15
3
13 0 - 11 3
24 -
ft
1:30
1
14 1 16 2
30
1:45
1
18 1 18 2
36
U5 mi
I'E!
2:00
0
2 22 74 0 4 18 66, 0 6
40 140
(n LOL
2:15
2
14 2 12 4
26
Uj
2:30
0
20 0 18 0
38
2:45
0
18 2 18 2
36
3:00
1
4 14 67 0 12 56 1
26 123
LL <
3:15
is 1 is 1
33
Ln 8
3:30
2
22 14 -
36
:r LU
3:45
1
13 is 2
28
1-- 3:1
4:00
0
3 so 0 1 17 67 0 4
31 107
Z
4:15
0
17 0 17 0
34
4:30
2
10 0 14 2
24
Z
4:45
1
9 2
18
LU uj
mi
6:00
1
14 11 38 1 8 13 39 2 22
24 77
Q!
5: 15
2
10 2 10 4
20
Cni
0
5:30
5:45
7
4
7 1 12 8
10
19
0
4 4 8
14
LU LU
6:00
6
.15 17 75 2 7 9 31 8 -22
26 106
x L)
6:15 -
2
22 0 2 2
24
6:30
5
23 1 9 6
32
z 1
6:45
7:00
2
13 4 11
24
6i
3
19, 32 64 2 7 11 61 5 26
43 115
7:15
1
7 2 22 3
29
7:30
6
6 0 7 6
13
0
z
7:45
9
9 3 21 12
30
8:00
12
39 5 18 12 32 16 47 24 71
21 65
8:15
10
3 4 9 14
12
8:30
10
6 10 10 20
16
8:45
7
4 6 12 13
16
9:00
6
44 8 24 16 73
10 29 11 29
19 53
9:15
16
4 7 4 23
8
9:30
12
5 7 3 19
8
9:45
10
7 5 11
18
10:00
15
44 1 14 8 40 3 16 23 B4
4 30.
10:15
14
3 '12 7
10
10:30
10
4 id 1 2 20
�6
10:45
5
6 10 4 15
10
11:00
12
47 2 5 16 41 2 5 28
10
11:15
10
2 10 3 20
5
11:30
9
1 6 0
11:45
16
0 9 0 25
0
Totals
240
526 176 509 414
Split x
58.0
50.8 42.5 49.2
Day Totals
685 - e :1.451
Day Splits
52.8 47.2
Peak Hour
9:15
6:15 10:15 1:45
1:46
Volum
53
90 48 66 89
140
Factor
0.83
0.70 0.75 0.92 0.79
6.88
JANUS Raw Data File: 9516601 Printed: 09-30-199S
Page 2'
-AC:
7 M.
''I'll R111, %,'j I,"
ELM-
U) U.
w 0
U.
wo
UJ
z I--
;7- 0
Z �-
W LU
0-
0!::
W LL
w fj
z
0
S12eed Report, Admiral Wav 0 Arnials, Edmonds, paae 4
Da-lv Control ession summ;4?-v
Av4�ge Speed of All Vehicles ...
19.84
Med3.aa--S2eed ....................
19.71
MPH
Mode Spee . ...................
17.50
15th Percentile eed ...........
15.42
H
85th Percentile Sp ...........
2 . 2
MPH
10 MPH Pace ........... .....
15-25
(77.68!k)
Vehicles Exceeding 55 m ......
None
Vehicles Exceedin PH
None
Vehicles Excee g 65 MPH '--�-None
kun eeak
....................
1�-7'06—to
12:00
(136
vehicles)
AM Hour
Factor
.............
79. 151;
?W'Peak Hour
....
17:00
to
8. 0
1�,�168
vehicles)
PM Peak Hour
Factor
.............
93.34;
Thursday 09/28/95
Channel:
I
Direction. S
0-
10-14 -19
15
20 -24 25-29
30-34 35-39
40-44 45-49 50-54
55-59
6 G+
Total
00:15 0
0
1
0
0
0
0
0
0
0
-0
0
1
00:30 a
0
0
0
0
0
0
0
0
0
0
0
0
00:45 0
0
0
0
0
0
0
0
0
0
0
0
0
01:00 0
0
0
2
0
0
0
0
0
0
a
0
2
Hourly Totals 0
0-
1
2
0
0
0
0
0
0
0
0
3
01:15 0
0
0
1
0
0
0
0
0
0
0
0
1
01:30 1
0
2
0
0
0
0
0
0
0
0
0
3
01:45 0
1
0
0
0
0
0
0
0
0
0
0
1
02:00 0
0
0
0
0
0
0
0
a
0
0
0
0
Hourly Totals 1
1
2
1
0
0
0
0
0
0
0 —0
5
02:15 0
0
0
0
0
0
0
0
0
0
0
0
0
02:30 0
1
0
0
0
a'
0
0
0
0
0
0
1
02:45 0
0
0
0
0
0
0
0
0
0
0
0
a
03:00 0
0
0
0
0
0
a
0
0
0
0
0
0
Hourly Totals 0
1
0
0
0
0
0
0
0
0
0
0
1
03:15 0
0
0
0
0
0
0
0
0
0
0
0
0
03:30 0
0
0
0
0
0
0
0
0
0
0
0
03:45 1
0
1
0
0
0
0
0
0
0
0
0
2
.04:00 0
0
0
0
0
0
0
0
0
0
0
Hourly Totals 1
0
1
.0
0
0
0
0
0
0
0
0
2
04:15
0
0
0
0
0
0
0
0
0
0
0
0
0
04:30
0
0
0
0
0
0
0
0
0
0
0
0
0
04:45
0
0
0
0
0
0
0
0
0
0
0
0
0
05:00
0
1
0
0
0
a
0
0
0
0
0
0
1
Hourly Totals
0
1
0
0
0
0
0
0
0
0
0
0
1
05:1S
0
1
1
1
0
0
0
0
0
0
0
0
3
05:30
0
0
2
5
1
1
0
0,
0
0
0
0
9
05:45
0
1
2
2
2
0
0
0
0
0
0
7
06:00
0
2
5
1
1
0
0
0
0
0
b
0
9
Hourly Totals
0
4
10
9
4
1
0
0
0
0
0
0
28
LL
(j) D
a
LU!
Z I.-
z
Ui LU
0
Ui Lul
�L- 0
z
ui (1)
0
z
PC
Speed R
'Admiral Way
@ Arni s,
Eftonds,
page
Thursday
09/28/95
Channel: 1
Direction:
S
--0- 9
10-14
15-19 20-24
25-29
30-34
35-39 40-"
45-4
50-54 55-59
60+
Totals
06:15
0
1
6 5
1
0
a
0
0
0
0
0
13
06:30
0
0
2 2
2
0
0
0
0
0
0
0
6
06:45
0,
0
4 2
3
0
0
0
0
0
0
0
9
07:00
0
1
2 i
2
0
0
0
0
0
0
0
6
Hourly Totals
0
2
14 10
8
0
0
0
0
0
0
0
34
07:15
0
1
3 3
0
0
0
0
0
0
0
7
07:30
0
2
5 1
1
0
0
0
0
0
0
0
9
07:45
0
0
1 3
0
0
0
0
0
0
0
4
08:00
0
3
9
0
0
0
0
0
0
0
12
Hourly Totals
0
3
12
16
0
0
0
0
0
0
0
32
08:15
0
1
5
4
4
0
0
0
0
0,
0
0
14
08:30
0
1
5
3
3
0
0
0
0
0
0
0
12
08:45
0
1
4
2
1
0
0
0
0
0
0
0
a
109:00
0
1
3
6
0
0
0
0'
0
0
0
0
10
Hourly Totals
0
4
17
15
8
0
0
0
0
0
--
0
0
44
09:15
0
1
6
5
1
0
0
0
0
0
0
0
13
09:30
0
2
7
a
2
1
0
0
0
0
0
0
20
09:45
1
9
7
2
0
0
0
0
0
0
0
19
10:00
0
3
5
2
0
0
0
0
0
Z
0
17
Hourly Totals
0
7
29
25
7
1
0
0
0
0
—
0
0
69
10:15
0
3
8
9
5
0
0
0
0
0
0
0
25
10;30
0
4
9
6
2
0
0
0
0
0
0
0
21
10:45
0
0
10
7
1
0
0
0
0
0
0
Is
11:00
0
4
1
6
0
0
0
0
0
0
0
30
Hourly Totals
0
11
46
28
1
0
0
0
10
0
94
1105
0
6
10
4
2
0
0
0
0
a
0
0
22
11:30
1
a
9
10
5
0
0
0
0,
0
0
25
11:45
1
7
16
5
3
0
0
0
0
0
0
a
32
12:00
1
11
9
2
0
0
0
0
0
0
0
42
Hourly Totals
3
24
54
28
12
0
0
a
0
0
0
0
121
12:15
1
9
17
3
1
0
0
0
0
0
0
0
31
12:30
0
5
12
14
0
1
0
0
0
0
0
0
32
12:4S
0
1
13
22
6
0
0
0
0
0
0
0
42
13:00
1
0
13
5
5
0
0
o
0
0
0
0
24
Hourly Totals
2
Is
55
44
12
1
0
0
0
0
0
0
129
1305
0
3
9
8
0
2
0
0
0
0
0
0
22
13:30
0
5
12
11
4
0
0
a
0
0
0
0
32
13:45
0
4
9
5
2
0
0
0
0
0
0
0
20
14:00
1
3
13
13
2
1
0
0
0
0
0
a
33
Hourly Totals
1
Is
43
37
3
0
0
0.
0
0
0
107
1405
0
9
10
9
4
1
0
0
0
0
0
33
14:30
1
3
14
12
1
0
0
0
0
0
_0
0
31
14:45
0
2
12
7
7
1
0
0
0
0
0
0
29
15:00
0
2 14 11
4
0
0
0
a
32
Hourly totals
1
16
50
39
16
3
0
0
0
0
0
0
125
" F,
%
Speed Report,
"Admiral WaY 0
Axnie"s,
Edmonds,'
P-acre
Thursday
09/28/95 Channel: I
Direction: S
0- 9
10-14
15-19 20-24
25-29
30-34
35-39
40-"
45-49
50-54
55-59
6G+
Totals
15:15
0
7
15 14
2
0
0
0
0
0
0
0
38
15:30
0
0
a 10
5
0
a
0
0
0
0
0
23
z
15:45
0
4
9 19
2
0
a
0
0
0
0
a
34
16:00
—S
2
9
6
0
0
0
0
0
0
0
24
3:
Uji
Hourly Totals
0
13
39 52
15
0
0
0
0
0
0
0
119
U:
IU
16:15
0
2
11 8
2
1
0
0
0
0
0
0
24
0!
16:30
0
1
10 13
4
0
0
0
0
a
0
0
28
Cn
16:45
1
4
9 7
4
1
0
0
a
0
0
26
En
LUU1 X!,
17.00
1
4
9 12
7
a
0
0
0
0
a
0
33
Hourly Totals.
2
11
39 40
17
2
0
0
0
0
0
ill
17:15
0
is 12
5
0
-0
0
0
0
0
0
40
17:30
1
5
17 9
0
0
0
0
0
0
36
L.L
M
17:45
0
1
14 12
7
1
a
0
0
0
0
a
35
T
Luil
18:00
5
17 13
4
-
0
a
0
0
0
0
0
.39
X,
Hourly Totals
1
19
63 46
20
1
0
0
0
0
0
150
;7- g
18:15
0
a
18 12
0
a
0
0
0
0
0
38
Z
LU wi
18:30
1
6
20 10
2
0
0
0
0
0
0
0
SOO'
-1 0;
18:45
0
5
17 15
6
0
0
0
a
0
0
0
43
(ni
19:00
1
14
19 4
1
1
0
0
0
0
0
0
40
0 ;-
Hourly Totals
2
33
74 41
9
1
0
0
a
0
0
0
160
LU W
19.15
0
3
23 16
6
0
0
0
0
0
0
0
4.8
u- a
19:30
0
1
7 7
4
0
0
a
0
0
0
0
19
Z.
19:45
0
3
14 5
1
0
0
0
0
0
a
23
L3 e
M,
20:00
1
2
10 11
1
0
0
0
0
0
0
25
Hourly Totals
1
9
54 39
12
0
0
0
0
0
1 0
0
115
z
20:15
0
0
4 7
0
0
0
0
0
0
0
0
11
20:30
1
1
9 5
4
0
0
0
0
0
0
0
20
20:45
1
2
7 1
3
0
0
0
0
0
0
'0
14
21:00
0
4
3 4
2
0
0
0
0
13
Hourly Totals
2
7
23 17
9
0
0
0
0
0
58
21:15
0
1
3
0
0
0
0
0
0
6
21:30
0
1
1 2
4
0
0
0
0
0
0
0
8
21:45
0
0
1 3
2
1
0
0
0
0
0
7
22:00
0
1
2 1
1
0
0
0
0
a
0
0
5
Hourly Totals
0
3
7 7
1
0
.0
0
0
0
0
'26
22.15
0
1
3 1
1
0
0
0
0
0
0
0
6
22:30
1
0
1 1
1
0
0
0
0
0
0
0
4
22:45
0
0
5 5
0
0
0
0
0
0
0
0
'10
23:00
2
2 0
0
0
0
0
0
0
0
0
4
Hourly Totals
1
3
11 7
2
0
0
0
0
0
0
0
24
23:15
0
0
2 2
0
0
0
0
0
0
a
0
4
23:30
0
4 1
0
1
0
0
0
0.
0
6
23:45
0
1
0 0
0
0
0
0
0
0
0
0
1
00:00
0
0
0 0
0
0
0
0
0
0
0
0
0,
Hourly Totals
0
1
6 3
0
1
0
0
0'
0
0
0
11
Daily Totals
IS
203
650 506
176
16
0
0
0
0
0
0
1569
Percentage
1.1%
12.9%
41.4% 32.2% 11.2%
1.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
U) LL
Uj 0
LL. <
D
0
z
LU LLI
0-
a t
UJ LL
IL
�L- C
2
LU U
0
z
vtz
.. ..... ...
it i�
V
fteed Report, 'Acl-jral Way 0 Arn iels, Edmonds'
2-age 7
Daily Control session summary
Average Speed of All Vehicles ...
19.63
Median speed ....................
19.33 MPH
Mode Speed ......................
17.50
15th Percentile Speed ...........
Is.11 MPH
85th Percentile Speed ...........
24.57 MPH
10 MPH Pace ......................
15-25 (73.68!k)
Vehicles Exceeding s5 MPH .......
None
Vehicles Exceeding 6o MPH .......
None
Vehicles Exceeding 65 MPH .......
None
AM Peak Hour ....................
11:00 to 12:00'(i2l vehicles) -
AM Peak Hour Factor .............
72.0!k
PM Peak Hour .........
18:15 to 19:15
(170 vehicles)
PM Peak Hour Factor ....
88.5!k
4-Hour Moving Totgl
01:00- 1457 02:00- 1459 03:00- 1456 04:00-
1456 05:00- 1457
06:00- 1446 07:00- 1436
08:00- 1420
09:00- 1391 10:00- 1378 11:00- 1400 12:00-
1385 13:00- 1363
14:00- 1376 15:00- 1422
16:00- 1463
17:00- 1452 18:00- 1434 19:00- 1509 20:00-
1537 21:00- 1556
22:00- 1S56 23:60- '1567
24:00- 1569
v":
M
Speed Report,-- 'Admigal Way 0 Arniefs, EdmondW
P-a-cfe 4
t 1 S---
Average s of All Vehicles
Median Spee . ............ 95 MPH
Mode Speed ..... ..... 22.50
z
15th Percentile S .. ......... 16.61 MPH
ME zk-
UJI
85th Percentile Spee ......... 27.11 MPH
cc
10 MPH Pace ..... ..... ..... 15-25 (70.02!k)
LU
Vehicles Excee i g 55 MPH 1 0.08%-)
_j
U 01
Vehicles Exc ing 60 MPH 0 .08%
c3i
LO UJ j
w X;
vehicles eeding 65 MPH ...
AM Peak our ............ . 5
...... :15 (73.vehicles)
AM P Hour Factor 83.
Cn LL
0
.........
eak Hour .................... 12:45 t"b-, :45 (114 vehicles)
PM Peak Hour Factor ............. 86.4*
U.
D
Thursday 09/28/95 Cha=el:' I Direction: N
S2 CI
UJ
0- 9 10-14 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 --60+
Totals
00:15 0 1 1 2 3 0 0 0 0 0 0
0
7
z
00:30 0 1 0 0 0 0 0 0 0 0 0
0
1
0!
Z
00:45 0 0, 0 0 0 0 0 0 0 D 0
0
0
Lu UJI
01.00 0 0 1 0 0 a 0 0 0 0
0
2
m!
Hourly Total's 2 1 3 3 0 1 -
0 0 0 0 0
0
10
00 !L-=
01:15 0 0 1 2 0 0 0 0 0 0 0
0
3
LU UA
01:30 0 0 1 0 0 0 0 0 0 0 0
0
1
X
01:45 0 0 1 0 1 0 a 0 0 0 0
0
2
U.
02:00 1 0 1 1 0 0 0 a 0 0 0
Hourly Totals 1 0
0
3
4 3 0 0 0 0 01 0
0
9
U
02:15 0 1 0 0 0 0 0 0 01 0 0
0
1
z
02:30 0 0 0 0 0 0 0 0 0 0 0
02:45 0 0 0 0 0 0 0 0 0 0
0
a
03.00 0 0 0 0 0 0 0 0 0
0
0
Hourly Totals 0 1 0 a 0 0 0 0, 0 0
0
1
0:15 1 0 0 0 0 0 0 0 0 0 0
0
1
03:30 0 0 0 0 0 0 0 0 0 0 0
0
0
03:45 0 0 a 0 1 0 0 0 0
0
1
04:00 0 0 a 0 0 0 0 0 0
0
0
A
Hourly Totals 1 0 0 0 1 0 0 0 0 0 0
0
2
0
04:15 0 0 0 0 0 0 0 0 0 0 0
0
0
04:30 0 0 a 0 0 0 0 0 0 0 0
0
0
04:45 0 0 0 a 0* 0 0 0 0 0 .0
0
0
05:00 0 0 0 0 0 OL 0
0
a
Hourly Totals 0
0 0 0 0 0 0 0 0 0
0
0
0
05:15 0 1 0 0 0 0 0 0 0 0 0
05:30 0
0
1
1 0 0 1 1 0 0 0 OL
0
05:45 0 1 0 2 0 0 0 0 0 0 0
0
-3
3
06:00 0 1 1 0 1 0 0. 0 0
Hourly Totals 0 3 1 3 1 2 0 a 0 0 0
0
10
fn U-
0
LLI
LL <
LU!
z
�-
z
W LU�
D Cd
LU U1
Z!
U)
T
0
z
to
"a
Speed Report,
'Admiral Way
0 Arnie's,
Edmonds'
ipage S
Thursday
09/28/9S, Channel: 1
Direction: N
0- 9
10-14
15-1
20-24
25-29
30-34
35-39
40-44
45-49
50-54
55-59
60+
Totals
06:15
0
0
0
2
1
0
0
0
0
0
0
0
3
06:30
0
0
1
0
0
0
0
0
0
0
0
0
1
06:45
0
0
0
0
1
0
0
0
0
0
0
1
07:00
0
0
2
0
1
0
0
.0
0
0
0
0
a
3
Mourly Totats
0
0
3
2
3
0
0
0
0
0
0
8
07:15
0
1
2
0
2
0
0
0
0
0
0
0
5
07:30
0
1
0
0
0
0
0
0
0
0
0
0
1
07.45
0
0
3
1
1
0
0
0
0
0
0
0
5
08:00
0
0
0
0
2
0
0
0
0
0
0
2
HourLy Totats
0
2'
5
1
5
0
0
0
0
0
0
0
13
08:15
0
0
3
5
3
0
0
0
0
0
a
0
11
08:30
0
0
2
5
0
0
0
0
0
0
0
0
7
08:45
0
a
1
1
2
0
0
0
0
0
0
0
4
09:00
0
1
6
2
2
0
0
0
0
0
0
0
11
Hourty Totats
a
1
12
13
7
0
0
0
0
0
0
0
33
09:15
0
0
1
2
3
1
0
0
0
0
0
0
7
09:30
0
2
3
2
0
0
0
0
0
0
0
is
09:45
a
0
2
3
3
0
0
0
0
0
0
0
8
10:00
0
0
1
5
5
0
0
0
0
0
0
0
11
HourLy Totats
0
2
7
18
13
1
0
0
0
0
0
0
41
10:15
0
2
4
5
6
0
0
0
0
0
0
0
17
10:30
0
0
0
6
2
0
0
0
0
a
0
0
8
10:45
0
0
, 6
13
1
0
0
0
0
0
a
0
20
11:00
0
a
2
3
4
0
0
0
0
0
0
9
Hourty Totats
0
2
12
27
13
0
0
0
0
0
0
0
54
11:15
0
2
5
4
3
0
0
0
0
0
0
0
14
11:30
0
5
1
4
3
2
0
0
0
0
0
0
15
11:45
0
0
1
7
3
1
0
0
0
0
0
0
12
12:00
0
2
2
6
2
1
0
0
0
0
0
0
13
flourty Totats
0
9
9
21
11
4
0
0
0
0
0
0
54
12:15
0
1
4
10
2
1
0
0
0
0
0
0
18
12:30
0
2
4
6
4
0
0
0
0
0
0
0
16
12:45
0
a
4
13
4
0'
0
0
0
0
0
0
21
13:00
0
2
6 13
4
0
0
o
0
a
0
1 0
25
Hourty Totats
0
5
is
42
14
1
0
0
0
0
0
0
80
13:15
0
1
5
5
12
0
0
0
a
0
0
0
23
13:30
0
2
3
12
7
1
0
0
0
0
0
0
25
13:45
0
2
7
is
a
1
0
0
0
0
0
0
36
14:00
0
2
8
-
12
2
0
0
0
0
0
0
0
24
Hourty Totats
0
7
23
47
29
2
0
0
0
0
0
0
108
14:15
0
2
5
14
3
3
0
0
0
0
0
0
27
14:30
0
3
9
9
3
0
0
0
0
0
0
0
24
14:45
1
1
11
13
a
0
0
0
0
0
0
34
15:00
2
3
16
10
1
0
0
0
0
0
0
39
Hourty 7`6tals
3
9
41
21
4
0
0
0
0
0
0
124
n '5
,
0.
07
Speed Re
ort
ral wa%r
a
Edmonds,,
pacre 6
Thursday
09/28/95. Channel: 1
Direction:.N
0- 9
10-14 15-19 -20-24
25-29
30-34
35-3
40-"
45-49
50-54
5s.59
60+
Totats
15:15
0
2 11 is
3
1
0
0
0
0
0
0
35
.15:30
0
0 3 10
7
0
0
0
0
0
0
21
z
15.45
1
3 16 13
4
o
0
0
0
0
0
0
37
�!
16:00
HourLy-Totats
0
1
0 9
9
0
0
0
0
0
0
0
26
LU;
5 38 so
23
2
0
0
0
0
0
0
119
16:15
16:30
0
2 9 15
a
1
0
0
0
0
0
0
35
-j 01
U
.0
0 4 9
4
2
0
0
0
0
0
0
19
16.45
1
0 10 19
6
0
0
0
0
0
0
0
36
tn LU
LU X�
17:00
0
1 6 a
6
0
0
0
0
-0
0
0
0
21
�j �- 1!
Hourty TotaLs
1
3 51
24
3
0
o
0
0
0
111
(n LL.
0
17:15
0
0 4 8
6
1
0
0
0
0
0
0
19
17:30
1
0. 4 5
0
0
0
0
0
0
0
16
LL. <
17:45
0
1 2 6
6
3'
0
0
0
0
0
0
18
18:00
0
1 5 7
1
o
0
a
0
0
17
Lu�
x!
HourLy Totats
1
2 15 26
21
5
0
0
0
0
0
0
70
z
;7-
18:15
0
0 4
4
0
o
0
0
0
0
0
16
z
LAJ LU;
18:30
2
2 4 9
2
0
0
0
0
0
0
19
18:45
0
21 6 7
4
0
0
0
0
0
0
a
19
19:00
.0
6 9
5
0
0
0
0
0
0
27
0
Hourty Totatz
2
10 21 33
15
0
0
0
0
0
0
0
81
U1
X
19:115
.0
4 5 12
4
0
0
0
0
0
0
0
25
j
LL
19:30
0
2 11 22
2
0
0
a
0
0
0
0
2w
z
w
19:45
5 10
5
1
0
0
0
0
0
gn
20:00
HourLy Totats
0
0
1 15 12
a 36' 56
6
0
1
0
0
0
0
0
0
0
0
0
0
0
17
0
1'
z
20,15
0
5 6 22
7
2
0
0
0
0
0
0
20:30
0
0 10 17
3
0
0
0
.0
0
0
30
20:45
0
1 5 15
3
0�
0
o
0
0
0
24
21:00
0
2 20
8,
0
1
0
0
0
39
Hourty Totats
0
a 29 74
21
2
1
0
0
0
0
0
135
21.15
1
4, 7
5
0
0
0
0
0
0
17
21:30
0
0 7 10
10
1
0
0
0
0
0
0
28
21:45
0
0 3 3
10
2
0.
0
0
0
a
22:00
0
1
2
0
0 --AO
0
0
0
Hourty Totats
1
21
30
5
0
0
0
0.
0
0
so
22:15
0
0 5 6
2
2
0
0
0
0
0
22:30
1
0 1 0
2
0
1
0
0
0
5
22:45
0
0 4 1
2
1
1
0
0
0
0
9
23:00
0
2 2 0
3
0
0
0
0
0
o
0
7
Hourty TotaLs
1
2 12 7
9
3
2
o
o
o
0
36
23:15
0
1 2 2
1
3
0
0
0
0
0
9:
23:30
0
1 0 1
3
0�
0
0
0
0
0
0
5
23:45
0
3 3 2
0
0
0
0
o
0
0
a
00:00
0
1
0
0
0
0:
0
0.
0
HourLy TotaLs
0
-6 6 5'
4
3
0
0
0'
4�
0
CIL
24
Deity TotaLa
13
as 343 550
286
38
3
0
0
0
0
0
1321
Percentage
1.0%
6.7X 26.0% 41.6%
21.7%
2.qj
0.2%
0.0%
0.0%
0. 0%
0.0%
0A,
7M
"Y'
Speed Report, 'Admiral Way 0 Arnie's, Edmonds'. pacre 7
Daily Control Session Summa
Average Speed of All Vehicles ... 21.7.9
Median Speed ..................... 21.97 MPH
Mode Speed ...................... 22.50
z
15th Percentile Speed .......... 16'.42 MPH
85th Percentile Speed ........... 27.25 MPH
Lull
cc 21
10 MPH Pace ..................... 15-25 (67.60k)
U-
Vehicles Exceeding 55 MPH ..... None
d 0i
Vehicles Exceeding 60 MPH ....... None
01
rn !
Vehicles Exceeding 65 MPH ...... None
-
L
n Ul
WX Jill
AM Peak Hour ............. ...... 10:30 to 11:30 (58 vehicles)
.
�-j
AM Peak Hour Factor ............. 72.5%*
Cn LL
0
PM Peak Hour .................... 19:15 to 20:15 (135 vehicles)
PM Peak Hour Factor ............. 80.4q;
:3
24-Ho�r moving Total
D
S2 CO
01:00- 1188 02:00- 1197 03:00- 1193 04:00- 1193 05:00- 1191 06:00- 1145 07:00- 1197 08:00- 1183
X Uj!
X!
09:00- 1184 10:00- 1156 11:00- 1156 12:00-, 1149 13:00- 1128 14:00- 1131 15.00 1153 16.
-00- 1197
1- 1
17:00- 1250 18:00- 1244 19:00- 1231 20:00- 1253 21:00- 1308 22:00. 1323 23:00- 1315 24:00- 1321
Ot
03 UJI
ml
0
Uj Ui
X
U-
z
z
0
C'.
0
Land Use: 420
Marina
Description
The marinas included In this analysis were both public and private facilities. In addition to docks
of the sites surveyed also had social and club activities, limited retail,
and berths for boats, some
and restaurants.
Additional Data
Information on transit trip ends is not available.
Information on person trip ends is not available.
Information on truck trips is not available.
Information on vehicle occupancy Is not available.
Information on peak hours of the generator is not available.
The studies were conducted In the late 1960's through late 1980's, In the San Francisco, San
Diego, and Seattle metropolitan areas. The number of boat berths range from 108 to 1,750, the
number of acres from 11 to 105, and parking spaces from 65 to 493.
Source Numbers
6,12,19,101, 123,265
TiYp Generadon, January 1991 642 Institute of Transportation Engineers
uaw riot ana
5,000
w 4,000
3,000
(D
2,000
Z,
1,000
leviation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
........... ..................
. ........ ............. ......
................ ......................
.......... ........ ......... ..........
.........
....... ... ................. ....... ............ ......................
x
)5,-- x
0--
400 3 5 0 100 Ow 1100
X = Number of Berths
X Actual Data Points Fitted Curve
Fitted Curve Equation: T = 1.891 (X)"4zj,1 0.795
------ Average Rate
R2 0.92
Trio Generation, January 1991 643 Institute of Transportation Engineers
z
F- Uj
cc:
LU
-i
U 0'
U) 0
Cn LU
LU
U) LL
LU 0.
LL.
BI
D 0
LU.
z
z
LU LU.
mp
U)
;7-
w
X
�L- 0
z
LLJ Cn
0
z
E
to
Number of Studies: 2
Average Number of Berths: 362
Directional Distribution: 60% entering, 40% xiting
Trip Generation Per Berth
Average Rate Range of Rates Standard Deviation
0.19
0.17-0.21
Data Plot and Eauation
80 .....
............ ................... ...... ...... ...... . . . . . . . . . . . . . . . . .
w
Q.
a)
x
70 .....
............... * ............
..............
. ............ ...........
60 ..... .. ........
.................. ...... ...........................
so
300 310 320 330 340 3W WO 3M M 390 400 410 420 430
X = Number of Berths
X ACtUal Vata Points ------ Avirage Rate
Fitted Curve Equation: Not given R2 = ****
T'YP Generation, January iggi 645 Institute of Transportation Engineers
01
A
0
to
CITY OF EDMONDS BARBARA FAHEY
260 STH AVENUE NORTH - EDMONDS, WA 98020 - 1206) 771-0220 FAX Q06) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works Planning Parks and Recreation Engineering
St. 189
September 24, 1996
Mr. William M. Toskey
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
Subject., Withdrawal of Shoreline Substantial DevelopmentApplication.
Dear Mr. Toskey:
This letter is to acknowledge the withdrawal of the initial Shoreline Substantial
Development Permit application for a dry boat storage building. We appreciate your
response to our concerns and look forward to working with you on future iterations of
this project and others.
Please feel free to call it you have any questions or need more information.
Sincerely,
P
Current Planning Supervisor
PC: File No. SM-96-95
& Incorporated August 11, 1890 9
Sister Cities International — Hekinan, Japan
Cc 2�
LU
_J
LU,
W
_J
(n LL
01
UJ
LL 51
LU
Z
�_ 0
Z �-
W LU
c)
LU UJ
L)
Z
:F
0
Z
M
P-0 R T
-OF
E D M 0 N D S
336 ADMIRAL WAY
EDMONDS. WASHINGTON 98020-7214
(206)774-0549
PAX (206) 774 -7837
Mr. Jeff-rey S. Wilson
City of Edmonds
Community Services Department
250 5" Ave N
Edmonds, WA 98020
Dear Mr. Wilson:
August 14, 1996
X
4111
*04
119,96
This letter is in response to your letter of August 7, 1996, subject "Comments on Environmental
Determination for the Proposed New Dry Stack Storage Facility and Marina Improvements". This
letter is also a follow-up to a letter submitted by Makers on behalf of the Port of Edmonds dated July
17, 1996 which contained the Application for Shoreline Substantial Development Permit, SEPA
Checklist, legal descriptions, Adjacent Property Owners Checklist, Critical Areas Checklist, City of
Edmonds Environmental Assessment, Port of Edmonds Mitigated Determination of Nonsignificance,
and preliminary Architectural Design Board approval. This letter is also a follow-up to our recent
discussions related to the Port of Edmonds application for a height variance related to a stack storage
facility at the Port of Edmonds.
As you requested in your August 7 letter, the Port of Edmonds is withdrawing its Environmental
Determination as originally issued on July 22, 1996 for the new dry stack storage facility. The Port of
Edmonds will also prepare appropriate environmental documents related to the latest version of the
Port Master Plan. We are already committed to working with the City to ensure that the Port's Master
Plan is compatible with the City's Comprehensive Plan and that any areas of disagreement are
amicably resolved. The Port is committed to developing a dry stack storage project which is fully
consistent with the current City Comprehensive Plan and documentation related to this project will be
presented to the City within the next two to six weeks. The Port will also resubmit its application for a
dry stack storage project that addresses all of the concerns of the City staff as well as the applicable
concerns of various citizens. We will specifically address Marina Beach parking, traffic impacts,
overall Port parking, and stream impacts.
As agreed on August 14, 1996, the Port will provide draft copies of each application, permit analysis,
or other appropriate document to the City staff for its consideration prior to official submittal. The Port
is committed to working cooperatively with all elements of the City staff on this and other significant
Port projects. I request that the City staff contact me if they have any questions or concerns related to
any issues contained in this letter or in relation to other projects or information contained within
various Port plans or documents.
Sincerely,
Wgi I I eiV. o s 4e
Executive DirectdK
0
LI) LA.
01
W
L.L <I
M,
0;
Z
Oi
�i �-;
W W!
2 mi
D
L)
0
W W1
LU CD
L)
0
Z
01
to
%'Ity U1 zuinunus
250 Fifth Ave N
Edmonds, WA 98020
Dear Mr. Wilson:
This letter is in response to your letter of August 7, 1996, subject: "Comment on
Environmental Determination for the Proposed New Dry Stack Storage Facility and
Marina Improvements". While I acknowledge receipt and understanding of all the issues
outlined in your letter, I do not necessarily agree with all of the conclusions related to
those matters; however, it is extremely important that the Port and the City remain open
to discussing all aspects of each of these issues. I believe that a proper discussion of
various issues will result in improved understanding which will minimize our differences.
In order to provide sufficient time for a comprehensive meeting to discuss all of these
issues, I will extend the comment period and the period for the City to consider assuming
SEPA jurisdiction to close of business August 15, 1996.
I understand that you have established a meeting with the appropriate City parties at I
p.m. on August 14. 1 will discuss all aspects of this issue with the Commission and the
Port's legal counsel on August 12, 1996 and I will be prepared to discuss all related
issues at the August 14 meeting. If you have any further questions on this matter, please
contact me promptly.
Sincerely,
Wi li os
Executive Dire
cc: City of Woodway
0
AUG-28-113% 16:44 P.01
ROR T
OF
E 0 1A 0 N a S
MOADMM"WAY
ZM0XMWASHM70MffiM0-7214
(200) 774-0"0 August 8,1996
IrAX (206) 774-7837
Mr. Jeffrey S. Wilson
City of Edmonas
250 Fifth Ave N
Edmonds, WA 98020
A
Dear Mr, Wilson-
This letter Is in response to your letter of August 7, 1996, 3*eot' "Comment on
-�A
Envitoranental Determination for the Proposed New Dry stack Storage Facility and
Marina Improvernents". While I acknowledge receipt and understanding of all the issues
outlined in your Iota, I do not necessarily agree with all of the conclusions related to
those tnattem; however, it is cxtmmcly importeint tbAt the Port and the City remain open
to discussing all aspects of each of these Issues. I believe that a proper discussion of
various issues will result in iinpro ved understanding which will minimize our differences.
k,
in order to provide sufficient timc for a eomprehensive meeting to discuss all of these
issues, I will wdend the comment period and the period for tho City to consider assurnin
SEPA jurisdiction to close of business August 15, 1996.
I understand that you have cstablished a meeting with the appropriate City puties at I
p.m. on August 14. 1 will discuss all aspects of this Issue with the Commission and the
Port's legal counsel on August 12, 1996 and I will be prepared to discuss all related
issues at the August 14 meeting. If you have any further questions on this matter, please
contact mc promptly.
sincerely,
Z
CI--
L.0
U) LU
LU
-J
Ln U0-
UJ
It
01
UJ
3:
0
Z �-
LU LLI
0 ;7-1
z
LU Cn
0
z
la
V ,
AUG 7 1996
PLANivilvEi DER
MEMORANDUM
Date: Tuesday, August 06, 1996
To: Jeff Wilson, Planning Supervisor
From: Arvilla Ohlde, Parks and Recreation Manager
Subject: Response to SM.-96-95 Port of Edmonds Application
Specific application content comments:
Environmental Checklist
1. A46/page 2 of 14
Tle statement response; last sentence states "and new floats HAVE TO be constructed by
11/96-3/97" 1 could not determine the immediacy of the need; further explanation of
timelines would assist in understanding timeline urgency.
2. A47/Exhibit C
page 13: No listing of the number of dedicated stalls required to meet the guest moorage
and public launch site,
page 21: Approved Master Plan design reflects the retention of the dedicated parking
provided by the Port for the public recreational user at Marina Beach Park.,
page 25: Approved detail of Master Plan design for Dry Boat Storage Layout identifies
26 parking spaces dedicated by the Port for public use at Marina Beach Park but no
written comments or definition of need or future use provided in the formal document.
page 26: Approved Master Plan states that the Dry Boat Storage building configuration
"allows existing on -site parking to remain"
page 26: Plan states under public access that "improvements are intended to allow
pedestrian and wheelchairs continuous access along the marina waterfronf,
page 28: Project 2000-2005 lists the "Admiral Way parking area improvements" with a
"completion date" of "early 2000". a delay of adding 16 parking stalls along the extension
of Admiral Way and on the east side of the Dry Stack Storage until 2000-2005 will not
provide a parking benefit to Marina Beach Park if Port parking is removed from public
park use.
3. A48/page 2 of 14
Add reference to environmental study "Feasibility Study Willow CreektUnion Oil Marsh
Enhancement Plan" Juno 30, 1991 completed by Watershed Dynamics for City of
Edmonds with Coastal Zone Management Grant Funds.
The study needs to be included as the potential of options for daylighting the stream
which provides enhancement and preservation of fish species. The document refers to the
City of Edmonds
'J
0
potential relationship with the Port of Edmonds in the accomplishment of daylighting
Willow Creek.
z Ji
4.
B#3
X Z
"Unknown" wetland is Union Oil Marsh; "unknown" stream is Willow Creek
�- LU
cc 2
Content of each described in the "Union Oil Marsh Study" completed by Peggy Gaynor'
<
LU
for the City of Edmonds funded by Coastal Zone Management Grant funds.
-J
U 0
a
5.
B#5
U) LU
additional fish: salmon; 1995/96 fish run through the tidegate area located on Port
Cn
LU X
-J I . . . . . .
property. The run returned to Willow Creek and into Union Oil Marsh and up to the Deer
Cn LL
Creek Hatchery. See preliminary "Edmonds Crossing Environmental Study for EIS"
UJ Of
2 �'
which is currently in progress through Washington Department of Transportation in
g ti
response to 4F Federal requirements to identify environmental impact. Ile study is
U-
currently being prepared by CH2M Hill.
D
6.
B#8h
This needs further comment. Reference to existing documents regarding sensitive areas,
z
7.
B#10 Exhibit D The Height Variance Application Declaration and Height Waiver ftuest
�- 0
Z �-
page 7: #4/D Document states no plans for obstacles to pedestrian use; the boardwalk and
L" LU
viewing platform need to be open to the public at all times.
page 8: #9/B Document states marina design will not "prevent pedestrian access to public
U Uy
0-
shorelines"
"it
13 L- i
page 8: #5 Document states does not cause any loss of " "use of surrounding
UJ UJ
X C.)
properties"
i=
LNL 0
page 15: Document states "Parking Impact: This plan will allow almost all existing on-
zi
site parking to remain."
..
UJ U)
page IS: As part of the document it is stated that "Site Facilities" "The Port is proposing
0
to construct public restrooms as part of the new structure. These restrooms will serve
z
boardwalk and city park users during normal operating hours."
8.
B#10b
No northern view diagrams were presented in the document. Western and southern views
do not reflect the views from the southern Marina Beach Park site, Without view
information, no comment available to respond to the impact if any
9.
B#10c
Landscape plans included in the document for western, eastern and southern views of
proposed project, the northern view from Marina Park not included. The layout design
indicate the landscape proposal, but a side view looking north not included. In
conversations with the Port, the Manager indicated that there would be canopy trees and
0
ground shrubs along the northern boundary of the park property. The document does not
refer to any boundary fencing anticipated for the proposed project. Verbal statement by
the Port Manager state the need to place security fencing between the Port and City
property (Exhibit D/ pg 16 & 17)
10.
B#12b
Verbal conversations with the Port Manager have indicated that Marina Beach Park public
t
recreationalists mill have use of parking areas on Port property. Comments need to be
included indicating that the use of the general Port parking areas, use of the east side
parking along the project and the use of the public restrooms needs to be clearly defined
= I K..;-
tud
Z
F- LLJ
Cr
LLI
_J
L) 0
En a
Cn LU
LIJ
to LL
LU 0
LL <
Ln D
0
:C
z
F_ 0
Z
LIJ LLJ
0—
LU LIJ
U_ 0
z
LU (n
0
z
I f,
M
9E
and stated that all is available for public recreationalist using the Port and the City public
recreational fhcilities,
11. B#12c
The proposal states that public pedestrian access will be improved and retained along the
waterfront and on the viewing platform. It needs to be assured through the permit process
that the Port will insure the retention of the opening of the boardwalk, viewing area and
pedestrian access to the Marina Beach Park. This areas should not be gated nor closed to
the public for use. City Parks in Edmonds have an opening and closing time which
is daylight to dusk but typically gates are not used to prohibit pedestrian access to public
area.
12. Exhibit 'T" not in document; Exhibit "E" states "it is felt there is more than adequate
on -site parking available."
B#14f
Exhibit 'T" not in proposal packet; Exhibit "E" does not provide enough data to make a
determination of impact. Ile data appears to reflect a minimal need for more parking for
the project and that the current parking in the area meets the need for the new project.
This does not correspond to verbal conversations with the Port Manager which states that
the Port will NEED to recover the dedicated parking stalls (22-26) currently dedicated for
public park use at Marina Beach Park.
13. B#14g
The response does not correspond with verbal conversations from the Port Manager. The
report does not reflect the need to develop parking needs for the users of the planned
project and the recovery of the areas from the dedicated public park use.
Marina Beach Park is a 4.5 acres developed waterfront park located on Puget Sound, south of the
Port of Edmonds Marina and west of the UNOCAL Oil Property. Marina Park is located adjacent
to the proposed planned Dry Stack Storage improvements currently discussed in this application.
Access to the site is off Admiral Way and through the Port of Edmonds. The site is currently
owned by UNOCAL Oil but leased to the City for use as a public waterfront park. On the south
side of the oil pipeline, additional flat unused shoreline exists, which is publicly accessed for
waterfront park users. Facilities on the park site include a large open picnic area, a children's
playground, portable restrooms, a beach volleyball couM a paved pathway, a car -top launch area
and small parking lot. Because the park is heavily used in the summer months, the limited amount
of parking and lack of permanent restrooms is often a problem. In the approved City of Edmonds
Comprehensive Park, Recreation and Openspace Plan it notes that minor improvements are needed
at the site which are a permanent restroom facility, new curbing and pave boat landing.
Marina Beach Park is listed in the Comprehensive Plan as a "Waterfront Park". Waterfront parks
are sites that permit the general public to physically reach or come very close to a saltwater
shoreline. In Edmonds saltwater sites are very limited because of existing development.
Because shoreline access is of limited quantity in Edmonds, waterfront parks should provide
facilities and activities specifically oriented to that environment. Uses related to other park types
should be located in another part of the city. Waterfront parks are sited as regional facilities" (page
VI-5 City of Edmonds Park and Recreation Plan/Recommendations) On page VI-13 of the
Comprehensive Park Plan it states "According to the Port's Master Plan much of the area used for
parking is to be developed for boat storage. When that occurs there will be a major shortage of
7:77
z
LU
LIJ
-J
0
tn UJ
LU X:
-J I--
Cn U.;
LU
LL.
UJ
z
�- 0
Z �-
UJ LU
Cn,
0
LU
U- 0
LU
M
parking at the Park. The City needs to work with the Port and examine other approaches to solving
the parking problem." "Ibe overall intent of Edmonds should be to develop a continuous public
shoreline access from Marina Beach Park at Edwards Point to Brackets Landing"
"Waterfront parks serve regional needs" (page IV-16 of the Comprehensive Park Plan) and the
Comprehensive Plan states that it is the recommendation that the standards of .6 acres per 1,000
population is the need in Edmonds. "The recommended standard of 0.6 acres per 1,000 population
reflects the current interest and demand for additional waterfront sites in Edmonds. Using this
standard, about 12.5 acres of additional waterfront park is currently needed."
Marina Beach Park is listed in the Snohomish County Comprehensive Park and Opensapce Plan as
a regional saltwater resource. (page 134) The plan states "to the extent practical, resource lands
will be linked by all types of trail corridors to increase access to and through significant and
visually interesting features" (pg. 133). Marina Beach Park is also listed in the Snohomish County
Comprehensive Park Plan as a point on the "Puget Sound Marine Trail". This saltwater trail when
fully developed in the State of Washington will provide cartop boating enthusiast on the Puget
Sound waterfront trail opportunities and rest points extending from Edmonds to LaConner. The
trail is promoted by the Washington Water Trails Association. (page 158)
Hstorically, the City of Edmonds and the Port of Edmonds in the early 1980's worked
cooperatively to develop Marina Beach Park as a public recreational benefit. The Port of Edmonds
provided the property on the southern Port property to be developed and used for parking (22
stalls)for the park. The City and the Port cooperate on the operation of the facility and have an
open relationship on the daily operation of the site.
In response to the Port of Edmonds application for development of the dry storage facility, the
following points need to be considered in relationship to the adjacent public park facility:
• The need for the removal and use of the Port of Edmonds portion of the parking provided for
or review. The approved Master Plan
Marina Beach is not stated in the documents provided f
designs do not indicate the removal of the current parking in Marina Beach, nor is there any
written documentation of need nor reasons for the removal of the use of the current dedicated
parking provided to the public recreational use at Marina Beach.
• Exhibit D The Height Variance Application Declaration is the only document that makes any
indication of the need for 26 stalls of parking for the proposed project. The only reference is a
highlighted area and a written reference to 26 parking stalls. There are no written reasons for
the need nor any explanations. The document continues to stress that parking is available at
the Port and no more parking is needed for this project. Ile opposite is stated in question # 12
of the Environmental Checklist (page 3 of 14). The statement reads the boat storage facility
"to be located at the existing boat storage shed location" no need is listed to recover the 26
parking stalls. Page 9 of 14 states that 4-8 people will be employed at the storage facility.
• Verbal conversations with the Port Manager during this past month have made indications that
there is a need for the removal of the parking dedicated to recreational use at Marina Beach as
the new project proposal needs to have the stalls for employees and boat visitors to the dry
stack storage. This is not reflected in the written documents nor in the approved Master Plan.
(page 21 states parking to remain)
• As part of the proposed project the Port has agreed to provide a public reWoom for public use.
The addition of this element is beneficial to the recreationalist using the boardwak viewing
areas and the adjacent public waterfront park. With the addition of a public restroom, the
potential elimination of the portable restroorn will be beneficial to the public recreationlists.
Verbal conversations with the Port indicate that they may also be interested in providing a
public meeting room with availability to the public for use. Both of these facilities would be
located on Port property and would be in the best interest of the City of Edmonds to have the
public facilities maintained and operated by the Port of Edmonds.
z
In conversations with the Port Manager it was stated that the need for the removal of the
parking dedicated for park use was to provide an area in preparation for the future phase
LU
Cr 2
development of the cast/west breakwater to provide for vehicle access to the water to
< =)
LU
accommodate passenger/cruise vessels. The development of this option stated as a Phase III
-J 0
project (page 22 of Master Plan) follows the bridging of the gap in the wave barrier where
(n 0
small boats will be entering and exiting after the Phase 11 development. Ile Phase III
Cn LU
W
development is not planned until 2004. The need to take parking from the current use results in
(n U. 11
an impact to the park. This reasoning is not stated in the formal presented document nor in the
0
Port Master Plan.
It was also stated verbally that the need to remove the current dedicated park parking was to
provide a secure area for boat owners visiting the boat storage, and a potential for the owners to
access their boats to work on them outside of the dry storage facility. In the drawing diagrams,
LU
the design indicates that in the south western comer of the upland project, boats are outside of
z
the facility. This may be a need but it is not stated in the presented documents nor in the
�- 0
Z �-
approved Master Plan.
LU W
If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the
C3
vehicle entrance into Marina Beach Park becomes a dead-end. Currently the amount of
cn,
0
dedicated parking and the parking configuration allows for vehicle egress out of the park.
0
W
With the need to eliminate the parking on the north side of the park, the ability for recreational
users to enter Marina Beach Park and then turn around and exit becomes impossible. To
�!t 0
accommodate the impact, the City of Edmonds would need to diminish the park openspace
Z
.. z
areas to provide for a turn around on the west end of the one row of parking stalls located at
W (n
the northern boundary of the site.
0
If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the
z
elimination of parking creates an impact on the park. The Port of Edmonds in verbal
conversations has stated that they will provide 16 additional parking stalls on the cast side of
the Boat Storage Facility on the western side of the extension of Admiral Way. They have also
stated that they will make up the remaining deficit in the parking areas to the north of the dry
boat storage area. It was stated that they would also provide directional signage to provide for
the recreational user opportunities to be aware of the parking areas set aside for recreational
user visiting Marina Beach Park. The additional 16 parking stalls are discussed in the
presented documents but no indications of additional public park parking use is discussed as
provided through the proposal.
If the removal of the dedicated public park parking (22-26 stalls) is justified and needed the
0
elimination of parking creates an impact on the park. An option that could be designed by the
Port is a joint use of the area between the southern boarder of the dry boat storage and the
southern edge of the Marina Beach Park city parking stalls. This entire area could be
configured to provide for joint parking use, the entrance and exit lanes could be designed, the
public could access the public restroom on the SE comer of the building with ease and the
secured gate could be placed between the joint parking lot and the boat owners outside work
area. This design concept would provide a greater benefit to the area without adverse stress on
the parking needs of the area.
(1)
rn
LLI
LU
C2
LL
Z
LU
L)
0
0
Lu
UL
UJ
2
D
u
0
LL
0
D
a
LU
Lu
di
L)
Z
Ef
r 0
Powers
power, by mutual agreement, to exercise jointly all powers
granted to each individual district, and in the exercise of
such powers shall have the right and power to acquire jointly
all lands, property, property rights, leases, or easements
necessary for their purposes, either entirely within or partly
within or partly without or entirely with6ut such districts:
PROVIDED, That any two or more districts so acting
jointly, by mutual agreement, shall not acquire any real
property or real property rights in any other port district
without the consent of such district.
A district may enter into any contract with the United
States, or any state, county, or municipal corporation, or any
department of those entities, for carrying out any of the
powers that each of the contracting parties may by law
exercise separately. (1961 c 24 § 1.]
53.08.245 Economic development programs autho-
rized. It shall be in the public purpose for all port districts
to engage in economic development programs. In addition,
port districts may contract with nonprofit corporations in
furtherance of this and other acts relating to economic
development. (1985 c 125 § 1.]
53.08.250 Participation in world fairs or expositions
authorized. See chapter 35.60 RCW.
53.08-255 Tourism promotion authorized. Any port
district in this state, acting through its commission, has
power to expend moneys and conduct promotion of resourc-
es and facilities in the district or general area by advertising,
publicizing, or otherwise distributing information to attract
visitors and encourage tourist expansion. (1984 c 122 § 10.1
53.08.260 Park and recreation facilities. A poF t
district may construct, improve, maintain, and operate public
park and recreation facilities when such facilities are
necessary to more fully utilize boat landings, harbors,
wharves and piers, air, land, and water passenger and
transfer terminals, waterways, and other port facilities
authorized by law pursuant to the port's comprehensive plan
of harbor improvements and industrial development. (1965
c 81 § 1.1
Harbor improvement plan: RCW53.20.010.
53.08.270 Park and recreation facilities —Approval
of other agencies. Before undertaking any such plan for the
acquisition and operation of any park or recreational facility
the proposed plan therefor shall be first submitted in writing
to the director of the parks and recreation commission and
to the governing body of any county or municipal park
agency having jurisdiction in the area. The state director
and/or such county or municipal park agency shall examine
the port's proposed plan, and may disapprove such proposed
plan if it is found to be in conflict with state or local park
and recreation plans for the same area. If such proposed
port plan is disapproved the port district shall not proceed
further with such plan. If the state director or the governing
body of the county or municipal agency does not respond in
writing to the port within sixty days, it shall be deemed that
approval has been granted. [1965 c 81 § 2.]
(1994 Ed.)
53.08.240
53.08-280 Police officers—Appointinent autho-
rized —Jurisdiction. Any port district operating an airport
with a police department as authorized by RCW 14.08.120
or designated as a port of entry by the federal government is
authorized to appoint police officers with full police powers
to enforce all applicable federal, state, or municipal statutes,
rules, regulations, or ordinances upon any port -owned or
operated properties or operations: PROVIDED, That such
police officers must have successfully graduated from a
recognized professional police academy or training institu-
tion. [1981 c 97 § 1; 1974 ex.s. c 62 § 1.]
53.08.290 Intermodal movement of interstate and
foreign carg6—Restrictions. In addition to the other
powers under this chapter, a port district, in connection with
the operation of facilities and improvements of the district,
may perform all necessary activities related to the intermodal
movement of interstate and foreign cargo: PROVIDED,
That nothing contained herein shall authorize a port district
to engage in the transportation of commodities by motor
vehicle for compensation outside the boundaries of the port
district, A port district may, by itself or in conjunction with
public or private entities, acquire, construct, purchase, lease,
contract for, provide, and operate rail services, equipment,
and facilities inside or outside the port district: PROVIDED,
That such authority may only be exercised outside the
boundaries of the port district if such extraterritorial rail
services, equipment, or facilities are found, by resolution of
the commission of the port district exercising such authority,
to be reasonably necessary to link the rail services, equip-
ment, and facilities within the port district to an interstate
railroad system; however, if such extraterritorial rail services,
equipment, or facilities are in or are to be located in one or
more other port districts, the commission of such other port
district or districts must consent by resolution to the pro-
posed plan of the originating port district which consent shall
not be unreasonably withheld: PROVIDED FURTHER,
That no port district shall engage in the manufacture of rail
cars for use off port property. (1981 c 47 § 1; � 1980 c 110
§ 2.]
Purpose-1980 c 110: Me purpose of this act is to:
(1) Clarify existing law as to the authority of port districts to perform
certain cargo movement activities and to contract for or otherwise provide
facilities for rail service for the movement of such cargo; and
(2) Provide authority for port districts to assist in development of the
recreation -tourism industry by acquiring and operating certain watercraft in
limited areas." [ 1980 c 110 § 1.]
53.08.295 Passenger carrying watercraft. A port
district may acquire, lease, construct, purchase, maintain, and
operate passenger carrying vessels on interstate navigable
rivers of the state and intrastate waters of adjoining states.
Service provided shall be under terms, conditions, and rates
to be fixed and approved by the port commission. Operation
of such vessels shall be subject to applicable.state and
federal laws pertaining to such service. ( 1980 c I 10 § 3.]
Purpose-1980 c 110: See note following RCW 53.08290.
53-08-300 Rewards for arrest and conviction of
Persons committing criminal offewes against port district
authorized. See RCW 10.85.030.
(1)
En
LU
_J
Ln
LU
X
U_
Z
U.1
2
D
0
0
a
Lit
U-
Z
7'
l—
Z
D
L)
0
0
D
0
LU
M
l-
0
uJ
D
a
E
r 0
:01
Powers
power, by mutual agreement, to exercise jointly all powers
granted to each individual district, and in the exercise of
such powers shall have the right and power to acquire jointly
all lands, property, property rights, leases, or easements
necessary for their purposes, either entirely within or partly
within or partly without or entirely without such districts:
PROVIDED, That any two or more districts so acting
jointly, by mutual agreement, shall not acquire any real
property or real property rights in any other port district
without the consent of such district.
A district may enter into any contract with the United
States, or any state, county, or municipal corporation, or any
department of those entities, for carrying out any of the
powers that each of the contracting parties may by law
exercise separately. (1961 c 24 § 1.1
53.08.245 Economic development programs autho-
rized. It shall be in the public purpose for all port districts
to engage in economic development programs. In addition,
port districts may contract with nonprofit corporations in
furtherance of this and other acts relating to economic
development. (1985 c 125 § 1.]
53.08.250 Participation in world fairs or expositions
authorized. See chapter 35.60 RCW.
53-08-255 Tourism promotion authorized. Any port
district in this state, acting through its commission, has
power to expend moneys and conduct promotion of reso?rc-
es and facilities in the district or general area by advertising,
publicizing, or otherwise distributing information to attract
visitors and encourage tourist expansion. [1984 c 122 § 10.)
53.08.260 Park and recreation facilities. A po5 t
district may construct, improve, maintain, and operate public
park and recreation facilities when such facilities are
necessary to more fully utilize boat landings, harbors,
wharves and piers, air, land, and water passenger and
transfer terminals, waterways, and other port facilities
authorized by law pursuant to the port's comprehensive plan
of harbor improvements and industrial development. (1965
c 81 § 1.]
Harbor improvement ptan: RCW SIM=
53.08.270 Park and recreation faeflities--Approval
of other agencies. Before undertaking any such plan for the
acquisition and operation of any park or recreational facility
the proposed plan therefor shall be first submitted in writing
to the director of the parks and recreation commission and
to the governing body of any county or municipal park
agency having jurisdiction in the area. The state director
and/or such county or municipal park agency shall examine
the port's proposed plan, and may disapprove such proposed
plan if it is found to be in conflict with state or local park
and recreation plans for the same area. If such proposed
port plan is disapproved the port district shall not proceed
ftirther with such plan. If the state director or the governing
body of the county or municipal agency does not respond in
writing to the port within sixty days, it shall be deemed that
approval has been granted. (1965 c 81 § 2.]
(1994 Ed)
53.08.240
53.08.280 Police officers —Appointment autho.
rized—Jurisdiction. Any port district operating an airport
with a police department as authorized by RCW 14.08,120
or designated as a port of entry by the federal government is
authorized to appoint police officers with full police powers
to enforce all applicable federal, state, or municipal statutes,
rules, regulations, or ordinances upon any port -owned or
operated properties or operations: PROVIDED, That such
police officers must have successfully graduated from a
recognized professional police academy or training institu-
tion. (1981 c 97 § 1; 1974 cx.s. c 62 § 1.]
53-08.290 Intermodal movement of interstate and
foreign cargii—Restrictions. In addition to the other
powers under this chapter, a port district, in connection with
the operation of facilities and improvements of the district,
may perform all necessary activities related to the intermodal
movement of interstate and foreign cargo: PROVIDED,
That nothing contained herein shall authorize a port district
to engage in the transportation of commodities by motor
vehicle for compensation outside the boundaries of the port
district. A port district may, by itself or in conjunction with
public or private entities, acquire, construct, purchase, lease,
contract for, provide, and operate rail services, equipment,
and facilities inside or outside the port district: PROVIDED,
That such authority may only be exercised outside the
boundaries of the port district if such extraterritorial rail
services, equipment, or facilities are found, by resolution of
the commission of the port district exercising such authority,
to be reasonably necessary to link the rail services, equip-
ment, and facilities within the port district to an interstate
railroad system; however, if such extraterritorial rail services,
equipment, or facilities are in or are to be located in one or
more other port districts, the commission of such other port
district or districts must consent by resolution to the pro-
posed plan of the originating port district which consent shall
not be unreasonably withheld: PROVIDED FURTHER,
That no port district shall engage in the manufacture of rail
cars for use off port property. (1981 c 47 § 1;.1980 c 110
§ 2.1
Purpose-1980 c 110: Me purpose of this act is to:
(1) CMfY existing law as to the authority of port districts to perform
certain cargo movement activities and to contract for or otherwise provide
facilities for rail service for the movement of such cargo; and
(2) Provide authority for port districts to assist in development of the
rccreation-tourism industry by acquiring and operating certain watercraft in
limited areas." [1980 c 110 § 1.]
53.08.295 Passenger carrying watercraft. A port
district may acquire, lease, construct, purchase, maintain, and
operate passenger carrying vessels on interstate navigable
rivers of the state and intrastate waters of adjoining states.
Service provided shall be under terms, conditions, and rates
to be fixed and approved by the port commission. Operation
of such vessels shall be subject to applicable.state and
federal laws pertaining to such service. (1980 c 110 § 3.1
Purpose-1980 c 110: See note following RCW 53.08290.
S3.08.300 Rewards for arrest and conviction of
persons committing criminal offenses against port district
authorized. See RCW 10.85,030.
10
Z-
LU
cc
LU L)
_J
U) LU
LU
_J
U) LL,
—0
LLJ
Z- �1
< —.1
CC
LL
LU
Z F_
l.— 0
Z �—
LLI Lli
M
U U),
LLJ Lul
LL 0
Z
Lii Cn
Z
EW
ME
Powers
power, by mutual agreement, to exercise jointly all powers
granted to each individual district, and in the exercise of
such powers shall have the right and power to acquire jointly
all lands, property, property rights, leases, or easements
necessary for their purposes, either entirely within or partly
within or partly without or entirely witho'ut such districts:
PROVIDED, That any two or more districts so acting
jointly, by mutual agreement, shall not acquire any real
property or real property rights in any other port district
without the consent of such district.
A district may enter into any contract with the United
States, or any state, county, or municipal corporation, or any
department of those entities, for carrying out any of the
powers that each of the contracting parties may by law
exercise separately. [1961 c 24 § 1.]
53.08.245 Economic development programs autho-
rized. It shall be in the public purpose for all port districts
to engage in economic development programs. In addition,
port districts may contract with nonprofit corporations in
furtherance of this and other acts relating to economic
development. [1985 c 125 § 1.]
53.08.250 Participation in world fairs or expositions
authorized. See chapter 35.60 RCW.
53.08.255 Tourism promotion authorized. Any port
district in this state, acting through its commission, has
power to expend moneys and conduct promotion of resourc-
es and facilities in the district or general area by advertising,
publicizing, or otherwise distributing information to attract
visitors and encourage tourist expansion. [1984 c 122 § 10.1
53.08.260 Park and recreation facilities. A poTt
district may construct, improve, maintain, and operate public
park and recreation facilities when such facilities are
necessary to more fully utilize boat landings, harbors,
wharves and piers, air, land, and water passenger and
transfer terminals, waterways, and other port facilities
authorized by law pursuant to the port's comprehensive plan
of harbor improvements and industrial development. [1965
c 81 § 1.1
Harbor improvement plan: RCW53.20.010.
53.08.270 Park and recreation facilities —Approval
of other agencies. Before undertaking any such plan for the
acquisition and operation of any park or recreational facility
the proposed plan therefor shall be first submitted in writing
to the director of the parks and recreation commission and
to the governing body of any county or municipal park
agency having jurisdiction in the area. The state director
and/or such county or municipal park agency shall examine
the port's proposed plan, and may disapprove such proposed
plan if it is found to be in conflict with state or local park
and recreation plans for the same area. If such proposed
port plan is disapproved the port district shall not proceed
further with such plan. If the state director or the governing
body of the county or municipal agency does not respond in
writing to the port within sixty days, it shall be deemed that
approval has been granted. (1965 c 81 § 2.)
(I S94 Ed.)
53.08.240
53.08.280 Police officers —Appointment autho-
rized —Jurisdiction. Any port district operating an airport
with a police department as authorized by RCW 14,08.120
or designated as a port of entry by the federal government is
authorized to appoint police officers with full police powers
to enforce all applicable federal, state, or municipal statutes,
rules, regulations, or ordinances upon any port -owned or
operated properties or operations: PROVIDED, That such
police officers must have successfully graduated from a
recognized professional police academy or training institu-
tion. [1981 c 97 § 1; 1974 ex.s. c 62 § 1.)
53.08.290 Intermodal movement of interstate and
foreign cargo —Restrictions. In addition to the other
powers under this chapter, a port district, in connection with
the operation of facilities and improvements of the district,
may perform all necessary activities related to the intermodal
movement of interstate and foreign cargo: PROVIDED,
That nothing contained herein shall authorize a port district
to engage in the transportation of commodities by motor
vehicle for compensation outside the boundaries of the port
district. A port district may, by itself or in conjunction with
public or private entities, acquire, construct, purchase, lease,
contract for, provide, and operate rail services, equipment,
and facilities inside or outside the port district: PROVIDED,
That such authority may only be exercised outside the
boundaries of the port district if such extraterritorial rail
services, equipment, or facilities are found, by resolution of
the commission of the port district exercising such authority,
to be reasonably necessary to link the rail services, equip-
ment, and facilities within the port district to an interstate
railroad system; however, if such extraterritorial rail services,
equipment, or facilities are in or are to be located in one or
more other port districts, the commission of such other port
district or districts must consent by resolution to the pro-
posed plan of the originating port district which consent shall
not be unreasonably withheld: PROVIDED FURTHER,
That no port district shall engage in the manufacture of rail
cars for use off port property. [1981 c 47 § 1; 1980 c 110
§ 2.]
Purpose--1980 c 110: "ne purpose of this act is to:
(1) Clarify existing law as to the authority of port districts to perform
certain cargo movement activities and to contract for or otherwise provide
facilities for rail service for the movement of such cargo; and
(2) Provide authority for port districts to assist in development of the
recreation -tourism industry by acquiring and operating certain watercraft in
limited areas," [1980 c i to § ij
53-08.295 Passenger carrying watercraft. A port
district may acquire, lease, construct, purchase, maintain, and
operate passenger carrying vessels on interstate navigable
rivers of the state and intrastate waters of adjoining states.
Service provided shall be under terms, conditions, and rates
to be fixed and approved by the port commission. Operation
of such vessels shall be subject to applicable,state and
federal laws pertaining to such service. [1980 c 110 § 3.1
Purpose-1980 e 110: See note following RCW 53.08.290.
53.08.300 Rewards for arrest and conviction of
persons committing criminal offenses against port district
authorized. See RCW 10.85.030.
(Title 53 RM—page 13i
Z.
Lu
Cc
U.1 U
_J
U 0
U) 0
U) LU
LLJ
_J
U) LL.
W 0
LL
Di
Ln Cl
=: L,
�- 3:
Z i-
�_ 0
Z �-
W Lu
0
Ui
�L 0
Z
Lu (n
U :-r
�- f7
0
Z
0
to �
.�'St. 189,
Ak
CITY OF EDMONDS ' BARBARA FAHEY
MAYOR
250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning * Parks and Recreation * Engineering
VIA FAX (774-7837)
AND U.S. MAIL
August 7, 1996
Mt. William Toskey
Executive Director
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
Subject: COMMENTS ON
PROPOSED NEW
E\dPROVENENTS
Dear Mr. Toskey:
ENVIRONNIENTAL DETERMINATION FOR TBE
DRY STACK STORAGE FACILITY AND MARINA
The City has received the permit application and environmental determination for the Port's
proposed new dry stack storage facility and marina improvements project. In our staff
deliberations of the documentation provided, the City has found that the documentation is
incomplete, the proposed project is not part of the Port's Master Plan chapter of the City's
adopted Comprehensive Plan, and, most importantly, the Port's most recent adopted Master Plan
has not been appropriately subjected to SEPA review per the state's process.
As the City's responsible official for review of your application, I have discussed this matter
thoroughly with all the City's key review parties, including Community Services Director Paul
Mar. Our goal is to have an adequate environmental review done in a cost effective manner. As
you are aware, the Port elected to act as lead agency in the environmental determination process.
If the City were to decide that the Port either didn't adequately submit a complete environmental
determination document or didn't adequately address key environmental issues, it could assume
lead agency status in the environmental process. This action by the City would automatically
that an Environmental Impact Statement be prepared, an effort which could cost our
$60,000 to $100,000.
The -City's preference is to cooperatively resolve its concerns with the Port in a manner that
minimizes the additional cost to its (City and/or Port) citizens. In order to achieve this goal, the
City sincerely requests that the Port of Edmonds 1) withdraw its environmental determination
originally issued on July 22nd for the above noted project; 2) issue an appropriate environmental
determination statement for the Port's recently completed. Master Plan, 3) work with the City to
assure that the City's Comprehensive Plan is modified to include the Port's new Master Plan, 4)
develop the proposed dry stack storage project consistent with the approved and appropriately
NPOR7�2-DOW-AUCW * Incorporated August 11, 1890 9
CORPLEVAGENCY Sister Cities International — Hekinan, Japan
nit its application for the dry stack storage project that
processed Master Plan, and 5) resubr f the City and Port District.
those raised by citizens I
the City's concerns as well as To ensure that
addresses ) your favorable, reply to the City's request.
look forward t( s letter, the City reserves the
On behalf of the City, I cumented in thi port not provide the City
the Port understands the seriousness of the matters do 3roject should the nse to this
assume lead agency status for the proposed I ine for your respo
right to August 9, 1"6 *- The deadl*
with a written reply by 3:00 PM on comment period on the environmental detirmination.
request is dictated by the expiration of the at 771-0223.
if you have further questions regarding this matter, please contact me Or Paul Mar
Sincerely, planning Division
Community Services Department
PffTey S Wilso i, AICP
Current ilanning Supervisor
SEPA Responsible Official
PC-. VIfile No. SM-96-95
Mayor Fahey
Scott Snyder, City Attorney
imunity Services Director
Paul Mar, Cotr
Rob Chave, planm�,Iz Manager
Steve Bullock� Projict Planner
Department Of Ecology
. . . . . . . . . . . . .
W
- - - - - - ......... -
MEMORANDUM
IV x
AUG - t7 1996
PLANNING DEPT.
Date: Tuesday, August 06, 1996
To: Jeff Wilson, Planning Supervisor
From: Arvilla OhIde, Parks and Recreation Manager
Subject: Response to SM.-96-95 Port of Edmonds Application
Specific application content comments:
Environmental Checklist
1. A"/page 2 of 14
The statement response; last sentence states "and new floats HAVE TO be constructed by
11/96-3/9711 1 could not determine the immediacy of the need; further explanation of
timelines would assist in understanding timeline urgency.
2. A#7/Exhibit C
page 13: No listing of the number of dedicated stalls required to meet the guest moorage
and public launch site.
page 21: Approved Master Plan design reflects the retention of the dedicated parking
provided by the Port for the public recreational user at Marina Beach Park.,
page 25: Approved detail of Master Plan design for Dry Boat Storage Layout identifies
26 parking spaces dedicated by the Port for public use at Marina Beach Park but no
written comments or definition of need or future use provided in the formal document.
page 26: Approved Master Plan states that the Dry Boat Storage building configuration
"aHows existing on -site parking to remain"
page 26: Plan states under public access that "improvements are intended to allow
pedestrian and wheelchairs continuous a6cess along the marina waterfront"
page 28: Project 2000-2005 lists the "Admiral Way parking area improvements" with a
"completion date" of "early 2000"; a delay of adding 16 parking stalls along the extension
of Admiral Way and on the cast side of the Dry Stack Storage until 2000-2005 will not
provide a parking benefli to Marina Beach Park if Port parking is removed from public
park use.
3. A#8/page 2 of 14
Add reference to environmental study "Feasibility Study Willow Creek]Union Oil Marsh
Enhancement Plan" June 30, 1991 completed by Watershed Dynamics for City of
Edmonds with Coastal Zone Management Grant Funds.
The study needs to be included as the potential of options for daylighting the stream
which provides enhancement and preservation of fish species. The document refers to the
City of Edmonds
0
t
L0
Potential relationship with the Port of Echnonds in the accomplishment of daylighting
WiHow Creek.
z
<
3:
4.
B#3
"Unknown" wetland is Union Oil Marsh; own- stream is Willow Creek
%mkn
,-- 8
cc 2
Content of each described in the "Union Oil Marsh Study" completed by Peggy Gaynor'
< n
for the City of Edmonds funded by Coastal Zone Management Grant funds.
LU U
-J 0
5.
B#5
0
additional fish: salmon; 1995/96 fish run through the tidegate area located on Port
UJ
3:
property. The run returned to Willow Creek and into Union Oil Marsh and up to the Deer
-JJ �-
(n U.
Creek Hatchery. See preliminary "Edmonds Crossing Environmen S dy for E S"
tal tu I
LU 0
which is currently in progress through Washington Department of Transportation in
response to 4F Federal
requirements to identify environmental impact. The study is
being
<.
currently prepared by CH2M Hill.
L,L
,n 31
6.
B#8h
a
This needs further comment. Reference to existing documents regarding sensitive areas.
z �-
7.
B#10 Exhibit D Declaration and Height, Waiver ftuest
�- 0
page 7: #4/D Document states no plans for obstacles to pedestrian use; the boardwalk and
Z �-
UJ LU
viewing platform need to be open to the public at all times.
page 8: #9/B Document states marina design will not "prevent pedestrian access to public
(n
shorelines"
0 ;7
C3
page 8: #5 Document states "it does not cause any loss of " "use of surrounding
LU
properties"
page 15: Document states "Parking Impact: Thi s plan will allow almost all existing on-
U- 0
z::
site parking to remain."
..
uJ cn
page 18: As part of the document it is stated that "Site Facilities" "The Port is proposing
to construct public restrooms as part of the new structure. These restrooms will serve
0
z
boardwalk and city park users during normal operating hours."
8.
B#10b
No northern view diagrams were presente d* in the document. Western and southern views
do not reflect the views from the southern Marina Beach Park site. Without view
information, no comment available to respond to the impact if any
9.
B#10C
Landscape plans included in the document for western, eastern and southern views of
proposed project the northern view from Marina Park not included. The layout design
indicate the landscape proposal, but a side view looking north not includa In
conversations with the Port, the Manager indicated that there would be canopy trees and
0
ground shrubs along the northern boundary of the park property, The document does not
refer to any boundary fencing anticipated for the proposed project. Verbal statement by
the Port Manager state the need to place security fencing between the Port and City
property (Exhibit D/ pg 16 & 17)
10.
B#12b
Verbal conversations with the Port Manager have indicated that Marina Beach Park public
recreationalists will have use of parking areas on Port property. Comments need to be
included indicating that the use of the general Port parking areas, use of the east side
parking along the project and the use of the public restrooms needs to be clearly defined
Z77711
0
LU
Cc
L.0 L)
_J
L) 0
En 0
Cn UJ
LU
_J
U) U-f
0
LL1
LL
31
LLJ,
0
Z F-
UJ UJ
LLJ
F- F-
LL 0
z
Lu tn
U -F
F-
0
z
E01
C 0
and stated that all is available for public recreationalist using the Port and the City public
recreational facilities.
It. B#12c
The proposal states that public pedestrian access will be improved and retained along the
waterfront and on the viewing platform. It needs to be assured through the pern-dt process
-that the Port will insure the retention of the opening of the boardwalk, viewing area and
pedestrian access to the Marina Beach Park. This areas shou)d not be gated nor closed to
the public for use. City Parks in Edmonds have an opening and closing time which
is daylight to dusk but typically gates are not used to prohibit pedestrian access to public
area.
12. Exhibit 'T' not in document; Exhibit "E" states "it is felt there is more than adequate
on -site parking available."
B#14f
Exhibit 'T' not in proposal packet; Exhibit "E" does not provide enough data to make a
determination of impact. The data appears to reflect a minimal need for more parking for
the project and that the current parking in the area meets the need for the new project.
This does not correspond to verbal conversations with the Port Manager which states that
the Port will NEED to recover the dedicated parking stalls (22-26) currently dedicated for
public park use at Marina Beach Park.
13. B#14g
The response does not correspond with verbal conversations from the Port Manager. 'Me
report does not reflect the need to develop parking needs for the users of the planned
project and the recovery of the areas from the dedicated public park use.
Marina Beach Park is a 4.5 acres developed waterfront park located on Puget Sound, south of the
Port of Edmonds Marina and west of the UNOCAL Oil Property. Marina Park is located adjacent
to the proposed planned Dry Stack Storage improvements currently discussed in this application.
Access to the site is off Admiral Way and through the Port of Edmonds. The site is currently
owned by UNOCAL Oil but leased to the City for use as a public waterfront park. On the south
side of the oil pipeline, additional flat unused shoreline exists, which is publicly accessed for
waterfront park users. Facilities on the park site include a large open picnic area, a children's
playground, portable restrooms, a beach volleyball court, a paved pathway, a car -top launch area
and small parking lot. Because the park is heavily used in the summer months, the limited amount
of parking and lack of permanent restrooms is often a problem. In the approved City of Edmonds
Comprehensive Park, Recreation and Openspace Plan it notes that minor improvements are needed
at the site which are a permanent restroom facility, new curbing and pave boat landing.
Marina Beach Park is listed in the Comprehensive Plan as a "Waterfront Park". Waterfront parks
Itwate
are sites that permit the general public to physically reach or come very close to a sa r
shoreline. In Edmonds saltwater sites are very limited because of existing development.
Because shoreline access is of limited quantity in Edmonds, waterfront parks should provide
facilities and activities specifically oriented to that environment. Uses related to other park types
should be located in another part of the city. Waterfront parks are sited as regional facilities" (page
VI-5 City of Edmonds Park and Recreation Plan/Recommendations) On page VI-13 of the
Comprehensive Park Plan it states "According to the Port's Master Plan much of the area used for
parking is to be developed for boat storage. When that occurs there will be a major shortage of
10
X Z
�- LU
Cc
LU
0
Cn 0
(n LU
LU
-J
Ln LL
0
LU
2 �
-J
LL
D
LU
F- X
Z F-
F- 0
Z �-
LU UJ
U cn
0-
0 F-
LU Lu
LL 0
z
Lu (n
0
z
0
parking at the Park. The City needs to work with the Port and examine other approaches to solving
the parking problem." "The overall intent of Edmonds should be to develop a continuous public
shoreline access from Marina Beach Park at Edwards Point to Brackets Landing"
'Vaterfront parks serve regional needs" (page IV- 16 of the Comprehensive Park Plan) and the
Comprehensive Plan states that it is the recommendation that the standards of .6 acres per 1,000
population is the need in Edmonds. "T'he recommended standard of 0.6 acres per 1,000 population
reflects the current interest and demand for additional waterfront sites in Edmonds. Using this
standard, about 12.5 acres of additional waterfront park is currently needed."
Marina Beach Park is listed in the Snohomish County Comprehensive Park and Opensapce Plan as
a regional saltwater resource. (page 134) The plan states "to the extent practical, resource lands
will be linked by all types of trail corridors to increase access to and through significant and
visually interesting features" (pg. 133). Marina Beach Park is also listed in the Snohomish County
Comprehensive Park Plan as a point on the "Puget Sound Marine Trail". This saltwater trail when
ful[ly developed in the State of Washington will provide cartop boating enthusiast on the Puget
Sound waterfront trail opportunities and rest points extending from Edmonds to LaConner. The
trail is promoted by the Washington Water Trails Association. (page 158)
Hstorically, the City of Edmonds and the Port of Edmonds in the early 1980's worked
cooperatively to develop Marina Beach Park as a public recreational benefit. The Port of Edmonds
provided the property on the southern Port property to be developed and used for parking (22
stalls)for the park. The City and the Port cooperate on the operation of the facility and have an
open relationship on the daily operation of the site.
In response to the Port of Edmonds application for development of the dry storage facility, the
following points need to be considered in relationship to the adjacent public park facility:
• The need for the removal and use of the Port of Edmonds portion of the parking provided for
Marina Beach is not stated in the documents provided for review. The approved Master Plan
designs do not indicate the removal of the current parking in Marina Beach, nor is there any
written documentation of need nor reasons for the removal of the use of the current dedicated
parking provided to the public recreational use at Marina Beach.
• Exhibit D The Height Variance Application Declaration is the only document that makes any
indication of the need for 26 stalls of parking for the proposed project. The only reference is a
highlighted area and a written reference to 26 parking stalls. There are no written reasons for
the need nor any explanations. The document continues to stress that parking is available at
the Port and no more parking is needed for this project. Ile opposite is stated in question #12
of the Environmental Checklist (page 3 of 14). The statement reads the boat storage facility
"to be located at the existing boat storage shed location" no need is listed to recover the 26
parking stalls. Page 9 of 14 states that 4-8 people will be employed at the storage facility.
• Verbal conversations with the Port Manager during this past month have made indications that
there is a need for the removal of the parking dedicated to recreational use at Marina Beach as
the new project proposal needs to have the stalls for employees and boat visitors to the dry
stack storage. This is not reflected in the written documents nor in the approved Master Plan.
(page 21 states parking to remain)
As part of the proposed project the Port has agreed to provide a public restroom for public use.
The addition of this element is beneficial to the recreationalist using the boardwalk viewing
areas and the adjacent public waterfront park. With the addition of a public mstroom, the
potential elintination of the portable rewoorn will be beneficial to the public recreationlists.
Verbal conversations with the Port indicate that they may also be interested in providing a
�V.
public meeting room with availability to the public for use. Both of these facilities would be
located on Port property and would be in the best interest of the City of Edmonds to have the
public facilities maintained and operated by the Port of Edmonds.
Z
In conversations with the Port Manager it was stated that the need for the removal of the
Z
parking dedicated for park use was to provide an area in preparation for the future phase
UJ
cc 2
development of the east/west breakwater to provide for vehicle access to the water to
<
accommodate passenger/cruise vessels. Ile development of this option stated as a Phase IH
UJ
-J 0
project (page 22 of Master Plan) follows the bridging of the gap in the wave barrier where
0
small boats will be entering and exiting after the Phase 11 development. The Phase IR
UJ
W X
development is not planned until 2004. The need to take parking from the current use results in
-J �-
cn u.
an impact to the park. This reasoning is not stated in the formal presented document nor in the
W 0
2 �
Port Master Plan.
It
9 -J,
* was also stated verbally that the need to remove the current dedicated park parking was to
U. < ) I
provide a secure area for boat owners visiting the boat storage and a potential for the owners to
Ln a I
access their boats to work on them outside of the dry storage facility. In the drawing diagrams,
X LU.
Z:
the design indicates that in the south western comer of the upland project, boats are outside of
z �-
the facility. This may be a need but it is not stated in the presented documents nor in the
J.-O
Z �-
approved Master Plan.
W W
If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the
vehicle entrance into Marina Beach Park becomes a dead-end. Currently the amount of
0 ;:
dedicated parking and the parking configuration allows for vehicle egress out of the park.
0
W LU
With the need to eliminate the parking on the north side of the park, the ability for recreational
X 11
Y,
users to enter Marina Beach Park and then turn around and exit become's impossible. To
�L- 0
accommodate the impact the City of Edmonds would need to diminish the park openspace
.. z
areas to provide for a turn around on the west end of the one row of parking stalls located at
Lu cn
the northern boundary of the site.
If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the
z
elin-tination of parking creates an impact on the park. The Port of Edmonds in veribal
conversations has stated that they will provide 16 additional parking stalls on the east side of
the Boat Storage Facility on the western side of the extension of Admiral Way. They have also
stated that they will make up the remaining deficit in the parking areas to the north of the dry
boat storage area. It was stated that they would also provide directional signage to provide for
the recreational user opportunities to be aware of the parking areas set aside for recreational
user visiting Marina Beach Park. lle additional 16 parking stalls are discussed in the
presented documents but no indications of additional public park parking use is discussed as
provided through the proposal.
If the removal of the dedicated public park parking (22-26 stalls) is justified and needed the
o
elimination of parking creates an impact on the park. An option that could be designed by the
Port is ajoint use of the area between the southern boarder of the dry boat storage and the
southern edge of the Marina Beach Park city parking stalls. This entire area could be
configured to provide forjoint parking use, the entrance and exit lanes could be designed, the
public could access the public restroom on the SE comer of the building with ease and the
secured gate could be placed between the joint parking lot and the boat owners outside work
0
area. This design concept would provide a greater benefit to the area without adverse stress on
the parking needs of the area.
A
77,
0
Date:
To:
Vrom:
Subject:
0 14 113 to] VO-T., I e I-_) I "
August 6, 1996
Paul Mar, CqWunity Services Director
Jeffrey S. Wils?n-, Current Planning Supervisor
PORT OF EDMONDS "DRY STACK STORAGE" CHRONOLOGY
Chronology of relevant events related to Port of Edmonds development activity, especially the
proposed "Dry Stack Storage'facility.
Date
Issue/Action
November 13, 1995
Letter sent to the Port outlining concerns with the Ports compliance
with the State Environmental Policy Act. Letter generated as a result of
Port taking action on a project and issuing an Environmental
Determination without providing the City to comment on the action as
required under the Act.
April 25, 1996
City staff conducted a pre -application meeting for the Port of Edmonds
and their consultants regarding the proposed "Dry Stack Storage"
facility. At this time City staff outlined potential issues, including the
potential environmental impacts of the project, and discussed the
process the Port would need to proceed through to requests permits for
the project. Staff included in this meeting: Jeff Wilson, Paul Mar, Jim
Walker, Steve Bullock, Rob Chave, Jeannine Graf, Ann Bullis, Sharon
Nolan, Gordy Hyde, Don Fiene, Public Works staff, and Fire Dept
staff.
May 21, 1996
Both Steve Bullock and I met with the Ports consultants on the
proposed "Dry Stack Storage' facility, Makers, and outlined concerns
regarding the draft environmental checklist the Port had prepared for
the proposed "Dry Stack Storage" facility. Concerns related included:
traffic, consistency with height regulations, view blockage, parking,
consistency with the City's adopted Comprehensive Plan -
Downtown/Waterfront Plan.
June 13, 1996
Staff (Paul Mar, Jeff Wilson, Steve Bullock, Gordy Hyde & Jeannine
Graf) toured the Port of Edmonds site with Bill Toskey, then attended a
meeting at the Port of Edmonds with Bill Toskey and the Port's
consultants to further discuss the proposed "Dry Stack Storage!'
facility. During this time, City staff again stated its concerns with the
City of Edmonds ce Planning Division -
W
POECHMN.M)C
Owl&
0
proposed project, questioned the method the Port was going to utilize to
process SEPA, offered to work with the Port on resolving
Z
environmental issues prior to issuance by the Port of an environmental
determination, and raised many other issues related to the proposed
Lui
cc 2:
project.
D
LU L)
July 8, 1996, The Port of Edmonds adopts a revised Port Master Plan. It is not
-J
L) 0
0
apparent of the Port, as required the State Environmental Policy Act
U) LU
n
adopted an environmental determination. If a determination was
-J �-i
adopted, the Port did not forward a copy to the City as required. If one
(n U.
0
was not adopted, the Master Plan may be invalid.
July 17, 1996, Planning Division receives written notification from the Port of their
.J
J
<,
adoption of a new Master Plan. Prior to this point, the PI i g
LJ-
(n 31
a
Division was not invited to participate in the review or comment on the
LU
document prior to its adoption.
Z
July 18, 1996 The Port of Edmonds submits an application for a consolidated permit
;-- 0
Z I--
review of the Port's proposed "Dry Stack Storage" project. Based on
LU W,
prelin-dnary review, the Port will need to obtain the following permits:
Shoreline Substantial Development Permit Shoreline Variance for
height in order to allow a 45-foot tall building (max. 35-feet allowed
under the State Shoreline Management Act), zoning variance for a 45-
LU
foot tall building (max, 30-feet allowed), Architectural Design Board
review' " Included in the permit application was the environmental
ZI
determination issued by the Port on July 15th. City had until July 29th,
U)l
to respond.
0
Z
July 22, 1996 1 fhxed a letter to Bill Toskey asking the Port to withdraw and reissue
the environmental determination issued on July l5tb, because the
determination was not transn-titted to the City until a week later, thus
eliminating 1/2 of the 15-day comment period required under State law,
July 23, 1996 City received letter from the Port indicating that the determination
issuance date had been changed.
Preliminary review of the environmental checklist submitted by the Port as part of their application
4
packet has resulted in the following issues and concerns:
0
1 . The environmental determination references the Port revised Master Plan as supporting the
proposed project. The "revised" Master Plan, adopted July 8th, has not been adopted by the
City as part of our Comprehensive Plan, an environmental determination as required by State
law does not appear to have been completed, and if it had, the City had not been notified.
2. Ile environmental checklist submitted with the application references a traffic study that has
t 0
not been completed, and would not be completed prior to the end of the 15 day cornment
period. Therefore the City does not what potential traffic impacts may be created by the
project, and will have not legal opportunity to comment on them.
0
X
3. The only mi6gation requirements adopted by the Port to mitigate the massive scale of the
proposed structure (15 feet taller than allowed by code and over 300 linear feet parallel to the
z
shoreline) is the landscaping and design features of the building.
<
UX
Additionally, I anticipate that upon completion of the review of the environmental checklist by the
staff prior to the end of the comment period on August 8th, that several other major issues and
-J Ot
impacts to the environment will be identified.
U) LUI
W X
City Options
_J f-;
(n LL
—0
LU
1. Assume Lead Agency status. This would require that an Environrnental Impact Statement be
prepared to address the impacts of the project and develop alternatives and mitigation
U- <
measures. This action must be taken by August Sth.
(n 0
UJI
2. Ask that the Port withdraw their environmental determination and work with the City to
z
address our concerns. I honestly do not think that this will resolve or adequately address our
Oi
z
concerns.
W LU!
D
3. Do nothing.
CnI
0
4. Appeal to Superior Court.
W LU
Attachments
ZI
ti; W
pc: Rob Chave
Steve Bullock
z
0
t4l'
IN""
7 77,
'k ,
X �'
LLJ
cc
LLI
-i
L) 0
U) a
U) LU
UJ
LU
LL-
01
LU
z
�- 0
Z �-
LU LU
g
cl).
0
Ui UJI
L)
U- 0
z
LU U)
0
z
za
C.,
VIA FAX (774-7837)
AND U.S. MAIL
November 13,1995
William Toskey
Executive Director
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
X
Subject: SEPA/SHORELINE PERNET REQUIREIVIENTS FOR PORT PROJECTS
Dear W Toskey:
I have reviewed your lett er of November 8, 1995, and wanted to respond to a couple of things
(see Enclosed).
Your letter indicates that the Port has completed a SEPA checklist for some project, and that if
the City wishes to review the document, we may request it. I believe this is in violation of State
law. The State Environmental Policy Act (SEPA), which provides the ability for certain quasi -
public agencies to act as the agency with jurisdiction for the environmental review process and
issue their own environmental determination, sets forth very specific requirements 'and obligations
under the law.
One of the most critical requirements for an agency issuing an environmental determination is to
inform and provide copies of the environmental checklist, supporting studies (if any), and the
envirom-nental determination to other agencies with jurisdiction and the Department of Ecology..
The City� being the local permitting authority (agency with jurisdiction) for building permits, land
use permits, and Shoreline Permits, is an agency that you must provide a copy of all
Frivironmental documents and the environmental determination for any project which requires the
issuance of a determination. Furthermore, this information must be provided in a timely fashion
after issuance of the determination, and with a minimum 15 day comment period (required by law)
for all agencies with jurisdiction to review and comment on the project.
The City, or any other �gency with jurisdiction, may assume. jurisdiction under SEPA if it does
not believe that the enviromnental review process was properly followed by your agency. If the
City or other agency does assume jurisdiction pursuant to SEPA, an Environmental Impact
Statement is required.
The concern here is that the Port has now submitted several projects which fall both under
jurisdiction of the SEPA and the Shoreline Management Act, and the Port has only partially
VJP0R7J.DW,&AUG-%
CORRMAGENCY
followed the required procedures for environmental review pursuant to the SEPA. Without the
required timely notifications and f
ull transn-dttal of documents, the City will be left with no choice
but to assume urisdiction and require the completion of an Environmental Impact Statement.
z
This will have to occur by November 22nd, if the Port does not properly complete the
environmental review process as required by SEPA.
LU:
=r
With regards to your request that the City waive the requirement for a Shoreline Substantial
LU U�
.-J
Development Permit. for your most recent proposal to pave an undeveloped area within an area
0!
U 0:
under shoreline jurisdiction, the City does not have the ability to simply waive the requirement for
Cn LW
(n
a permit unless the project meets one of the specified exemptions provided for under the Shoreline
LU
-J �-iij
Management Act. To the best of my understanding of the proposed project, it does not appear to
Cn U. I
meet any of the specified exemptions under the Shoreline Management Act.
LU 01
When the appropriate permit materials and environmental review documents and determinations
are properly submitted to our office in conformance with all applicable local and state regulations,
(n 01
the City will consider the permit applications complete, and will initiate processing of said
Uiz
applications.
1
z 1--,
0
If you have any further questions regarding this matter, 'please do not hesitate to contact me at
�i 1--,
771-0223.
LU LU
L) U)II
Sincerely,
0
a ;: i
Community Services Department - Planning Division
LU
LOY
Oi
Z:
Jeffrey S. Wilson, AICP
W Cn!
Current Planning Supervisor
X
0
z
Enclosure: November 8, 1995 Letter from Ardliam Toskey
pc: File No. ADB-95-130
File No. SM-95-130
File No. ADB-95-157
File No. ADB-95-158
Mayor Hall
Scott Snyder, City Attorney
Paul Mar, Community Services Director
Rob Chave, Planning Manager
0
John Bissell, Associate Planner
Kirk Vinish, Planner
Ron McConnell, City of Edmonds Hearing Examiner
Department of Ecology
Department of Ecology - Shorelands Division
Port of Edmonds Board of Directors
Page 2 Of2
9SPORT_LDOCI&AU0�%
CORREVAGENCY
. . . . . . . . . . 0
SA; 7 ®r,
g?
U) LL.
10
LL
D
TO
uj:
z
0:
Z
LU Lu!
U);
0-
0 �-
LU UJ
bi
Z!
U)
z
to
E
Description of proposal: Port of Edmonds Dry Stack Boat Storage Facility, Pedestrian BoardwalldLook-out,
adjacent commercial/office addition
Proponent: Port of Edmonds
Location of proposal, Including street address if any: In southern portion of Port property
Lead agency: Port of Edmonds
The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the
environment. An environmental impact statement is not required under RCW 4321.030(2)(c). Ibis decision wai
made after review of a completed environmental checklist and other information on file with the lead agency. This
information is available to the public on request.
There is no comment period for this DNS.
X This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days
the DNS per WAC
from the date below. Comments must be submitted by 15 days after issue of
197-11-340(2)(a).
Responsible Official: Bill Toskey
Positfonfritle: Executive Director
Phone: (206) 774-0549
Address: 336 Admiral Way, Edmonds, WA 98020
Date: Signature:
You may appeal this determination to Port of Edmonds Commissioners, 330 Admiral Way, Edmonds,
WA 98020, no later than 30 days after issue, by filing a written appeal citing the reasons, per WAC
197-11-680(4)(c).
You should be prepared to make specific factual objections. Contact William Toskey or ask about the procedures
f6r SEPA appeals.
Page I of 7
Mailed to the following along with the Enviromnental Checklist:
City of Edmonds
2327034-011-0008
250 5th Avenue N.
Union Oil Company
Edmonds, WA 98020
P.O. Box 7600
z
<
�"
Los Angeles, CA 90051
x
Environmental Review Section
Uj;
CC
Department of Ecology
232703il-057-0009
L4 Q!
P. 0. Box 47703
Burlin on Northern Railroad Co.
9t
UOI
Olympia, WA 98504-7703
777 Main Street
Cn
U) UJ !I
Fort Worth, TX 76102
Washington State Dept of
-j t.- I
Transportation
2327034-003-0008
Ln U0
TSM&P/Land Developer
Harold R. Stone & L. Ardean
15700 Dayton Avenue North
14277 Worden Way
Seattle, WA 98133
Saratoga, CA 95070
U-
Community Transit
232703-4-013-0006
x UJI
Attn: Marvin Freel
Margaret B. Vorwick Trust
z
1133 164th Street Southwest, #200
clo Brice Inv. Realty
0!
1--�
Lynnwood, WA 98037
9450 SW Commerce Circle
LU Lui
Wilsonville, OR 97070
Burlington Northern Railroad
U to,
2900 Bond
Trouts Ln. timited
0
Everet� WA 98201
LaiTy Johnson
UJ UJ
1212 NE 65th Street
X Ly
�- p
232703-1-045-004
Seattle, WA 98115-6724
LL 0,
ESC Associates
z
3131 E. Madison Street, Suiti 102
Seattle, WA 98112
0
z
MITIGATING MEASURES INCORPORATED INTO THE
PROPOSAL:
In order to mitigate the potential impact of the requested height variance for the proposed dry� boat
storage shed this proposal contains the mitigation measures.
See the following attachments
to
Page 2 of 7
-'T
-7!7-77 V,
V "XiN INNI,
Z
Z
U)
cc:
<
LU
-J
(-)0
V) a
U) LU
LU
-J
U) W;
LU
M�!
cc
LL <
Lij
z
�- 0
Z �-
LLJ LU
U)
0
a
LLJ
LL 0
z
LU U)
L) y
F-,
z
ME
VIA FAX (774-7837)
AND U.S. MAIL
July 22, 1996
Mr. William Toskey
Executive Director
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
Subject: ENVIRONMENTAL DETERMINATION FOR CONSOLIDATED PERMIT
APPLICATION FOR NEW DRY STACK STORAGE FACILITY AND MARINA
IM[PROVENIEWS
Dear b&. Toskey:
I have just reviewed your new permit application which was submitted in the late afternoon on
July 19th, including the environmental determination issued by the Port for the proposed Dry
Stack Storage facility and other Marina improvements.
I
The Port, acting in the role,of lead agency, issued a M[itigated Determination of Nonsignificance
on July 15, 1996, with the 15-day comment period expiring on July 29, 1996 (see Enclosed). The
actual determination was not delivered to the City of Edmonds until late afternoon (approximately
3:00 PK on Friday July 19th, thus effectively eliminating half of the mandatory review time for
other agencies with jurisdiction.
The Port, as Lead Agency, is responsible for following the procedural requirements of the State
Environmental Policy Act when issuing an Environmental Determination. Specifically, pursuant
to WAC 197-11-340(2)(b): "Ae responsible official shall send the DNS and environmental
checklist to agencies with jurisdiction, the department of ecoloV, and affected tribes, and each
local agency or political subdivision whose public services would be changed as a result of
implementation of the proposal, and shall give notice under 197-11-510. " Furthermore,
pursuant to WAC 197-11-340(2)(d): "The date of issuefor the DNS is the date the DNS is sent
to the deparhnent of ecology and agencies with jurisdiction and is made publicly available. "
Additionally� it is unclear when the Port actually sent copies of the M[itigated Determination of
Nonsignificance to the other fisted agencies and tribes in order to allow them to comment.
Furthermore, based on the list provided on the second page of your detennination letter, it does
not appear that the Tulalip Tribe was listed for notification.
Therefore, given that the determination was not officially transmitted to the City of
Edmonds until July 19th, I am requesting that the Fort, as Lead Agency, provide written
%PORT-I.D006-AUGM
coRRMAGENCY
I
rn u-I
0
Uj
2 �
LU:
z
;7- 0'
z J.-:
LU Ui:
0
0—
LU W
m U�I
21
LU U)
X
0
z
0
-LY'A - %Jv' 'Luu 12M15'Huc, ly1ftmcnO, bnuln -1 Ower, Second Avenue, Seattle, WA 98104
"Poitr-1.00MAMN
CORRWAGENCY
Page 2 Oft
0
June 17, 1996
Paul Mar
City of Edmonds
250 Fifth Ave N
Edmonds, WA 98020
WA
Dear Pau
This let er is a follow-up to our joint meeting on.7une 13. 1
thank you for your participation and willingness to involve
appropriate City staff to assist in a full range of discussions
related to the Port's future plans, particularly the stack
storage facility. I believe the meeting was very helpful to Port
staff and consultants and we will work very hard to meet the
City's expectations in the permit application process.
Specifically, we will make the following commitments to help move
this project along:
Consider providing restr oons, for the Marina Beach Park.
patrons.
Modify the parking in the south Port area to provide
designated spaces for Marina Beach patrons sufficient to
compensate for the loss of parking on Port property.
Provide clear walkway and pedestrian facilities from
Marina Beach Park north to Olympic Beach Park.
Work with the City staff to prepare vegetation,
architectural features, and structural adjustments to
mitigate the visual impacts of the facility.
Provide additional documentation showing the view impacts
from various locations throughout the Edmonds bowl.
Continue to develop requirement documentation for the'
facility and the impacts of feasible alternatives.
Incorporate City building code requirements into the
various features of*the complete storage facility.
0
Prepare permits, design documents, and the construction
packages in an expeditious manner in order to minimize
the impacts during construction.
Conduct technical one-on-one meetings with appropriate
members of the City staff and ensure that all prepared
documents and permits meet the City's expectations.
Prepare parking and traffic plans appropriate for the
long range known requirements of the Port.
Update and revise the Port Master Plan in accordance with
the City comprehensive Plan.
The Port w.ill'*ta'ke'the-.above actions and all other actions,
necesaary th. ansure -the Port staff cind itd con.sultantz ard-
working closely with Pity'staff on -this and relait'ed'ptojects.
We appreciate the City staffis underdtandin4-of,our'nedd to
expedite this project in order to minimize disruptions to the
public's use of the community's waterfront facilities.
Again, I thank you for your cooperative approach to the Port's
permitting issues. We look forward to members of your staff
assisting the.Port with early notification of important issues
and helping to identify mutually acceptable alternatives.
Sincerely,
ve Director
i��'(2'0"6_) 7-7-4---7837 April 22, 1996 PLANtVjjy6 DEPT.
U)
LU
au;
Mr. Paul Mar
U)
LLI
City of Edmonds
-
Uj
O�
250 Fifth Ave N
2�:
Edmonds, WA 98020
<
51
Re: E;dmd town Waterfront lilan
0"
Cal i
LU
=:I
Dear Mr.
Z
�_.
V_;
O�
This etter documents the manner in which the Port of Edmonds
LU
UJI
Master Plan and construction program conform to and support the
1994 Edmonds Downtown Waterfront Plan. As you know, the Port
rrr 0
participated in the plan development, and our master planning
team has made a special effort to implement the plan as it
pertains to the Port's property. The attached chart references
specific statements in the plan and describes the Port's response
0
to each statement.
Z
LI!
01
X:
I understand that the Downtown Waterfront Plan (DWP) was not
specific with regard to the Port area Master Plan because the
Z
planning team and advisory committee realized that he Port would
require design flexibility in preparing a successful Master Plan
that supports the DWP. The DWP does envision the Port area to be
a keystone in the overall downtown waterfront redevelopment,
providing a key pedestrian connection along the shoreline and a
mixed -use activity focus that bridges the area between the Point
Edwards site and downtown.
Consolidating dry boat storage into a more compact footprint and
developing the.east side of Admiral Way with waterfront
supportive activities will allow us to better implement the DWP
0
goals, provide for*water-dependent uses, and serve local citizens
and visitors.
Sincerely,
9 LI !
Toskey
Ve Director
see
0
0
ate
0
DOWNTOWN WATERFRONT PLAN STATEMENT
PORT MASTER PLAN RESPONSE
1. Port Improvements to am . key component to the phase me
Intensification of activity and esplanade completion will be completed in
redevelopment strategy. 'PortAma: upgrade marina and shoreline
Phase I time frame. South Marine will be rebuilt.
access as par Port Plan.- (Page 3, legand)
2. The plan calls for"consolidating marma"I'lld "'Iffer, . (Page 4 and
Dry boat storage will be consolidated into a single structure.
map on Palo 1, on .go
3. 'Coordinate circulation and public parking With Poll development."
SEPA analysis of proposed development included a tuaffic study.
(Page 6. Item 3.)
Improved parking at Dayton and SR104
4. Complete public esplanade along waterfront. (Page 8, note on phan.)
Esplanade completion will be a Phase I element and will Include an
elevated Iewmg platform.
5. Vision statements:
uDowintown is extended Westward and connected to the shoreline
Marine support buildings extend retail and office uses Into the Port am.
by positive mixed -use development as Wall as by cumveruent
pedestrian routes. -
"The shoreline features a full spectrum of—reational activities,
Port developmentwill allow mom efficient land/Water tublimilon and mom
park seffings, and marine facilifies.'
activities, to Include tour boats, kayaks, and personal "ter"""
'Them!s a mom active and vital setting for new retail office,
Increased moorage and boat storage Will bring mom people Into downtown
entertainment and associated businesses supported by a nearby
area. New buildings expand visitor activities.
residents, downtown commercial ..fiWIY and vhiltms from
throughout the region.*
�The downtown supports a Ix of uses W1 thut ancroaching into
New buildings Will not block views from public rlght�l-way or maildences.
single fimAi y neighborhoods. Them is some new multi -story
development In the existing downtown where residential views am
not blocked.-
�Opporfimffies for new development and redevelopment which
Proposed Impmvements include pedestrian improvements at buildings and
rairdbuce Edmonds'attmotive. small town pedeeftlan oriented
esplanade.
character.'
(page 9.)
32X
10 25X 1
6 M!
ju
0
in
LU
_j
Cn U.
LU 0
_j
LL
C1
W:
X.
z
z
LLI LU
2 D;
:D Cl:
L) U)'
0
0
z
LU (a
z
K121
Marina Parking
EXISTING
MASTER PLAN
South Basin
Auto/Marina
252
340 (354)*
Trailer��
139
100(86)
On -Street
32
41
Anthony's Restaurant
82
82
North Basin
Auto/Marina
221
221
On -Street
48
40
Marine Services Building N/A
72
774
896
Depending on final layout of trailer spaces
63 trailer spaces temporarily used for dry boat relocation; can be replaced in North Basin
Additional Parking Currently Available
Boat Trailer Lot with 100 50-200 (Temporary use; off-peak times)
Trailers and/or Vehicles
Temporary Parking at Future 200-250* (Until construction begins)
Marina Service Building Site
260-450 Total Temporary Spaces
* Maximum auto spaces; alternative is 75 boat trailer and 100 auto spaces
< I.: I
Z�
UJ
Lu
0
Cn a
U) LU
Ui 3:
Ln OU
w
LL <1
D
Lu
3:
Z �-
l.- 0
Z �-
LLJ LU
Cn
0—,
0 �-
W UJ
LL 0
Z
LU tn
!E
0
Z
4
O'l
t 0
0 RT
�,4
ALI
Volume 6, Number 1, Spring 1996
An indoor dry storage facility, similar to one being planned by the Port.
The final planning phase is
complete and the Port is preparing
to begin construction of a 500-boat
indoor dry storage facility.
The project, which has been a key
part of the Port's long range plan
for several years, will be con-
structed at the south end of the
marina where the existing boat
sheds are located. The type of
facility being planned is brand new
to the Pacific Northwest and will
provide a significantly higher level
of service than existing dry storage
facilities in the area.
The estimated cost of the building
and support facilities is $4 million
and the target completion date is
about a year away.
In a detailed report, the market
research firm of BST Associates
stated that demand for such a
facility is very high, particularly for
vessels in the 24-32 foot range.
They said it should reach capacity
within two or three years.
Port executive director Bill Toskey
explained, "With the expanding
population in our service area and
with no substantive increases in
moorage capacity for many years, I
believe that the Port of Edmonds
has a responsibility to address all
options that could increase boating
opportunities:"
A complete package
Besides the building itself, the
facility will comprise a new double
launcher and staging float, replace-
ment and relocation of "A" dock,
Commissioners: Dan Prinz, Ben Cain, Don Stay
H.wt!171,
and a new bulkhead with prom-
enade, similar to that constructed
four years ago in the north marina.
The project also includes parking
lots, landscaping, utilities, walk-
ways, storage lockers, wash -down
facilities, fire alarm and fire control
systems, a small Port office, and
restroom facilities. In addition,
there is an option of adding 10,000
square feet of commercial space at
the north end of the building.
As with existing moorage at the
Port, tenants will be charged
according to the size of their boats.
A tenant will be able to call in from
home, ask to have their boat
launched and —by the time they
arrive —find it in the water and
ready to go.
The new facility has been in the
planning process for several years.
It is the first phase of the recon-
struction and renovation of the
entire south marina and part of a
continued on page 4
e�-
< I..:,
=Z.
�- UJ
Cc
LIJ
0
U) a
U) LU
LU
LL;
0'
U.1
2�1
g:31
Lt <i
M
z
�._ 0
z I—
W LU
0-1
a �-
LU UJI
= U
F_
z
L Li in
0
z
0.1
t 0
J
A
4
Stack Storage
continued from page I
sequence of events that will
eventually increase the Port's
moorage capacity by 30 percent.
According to Toskey, the Port
currently has approximately 320
boats in dry storage spaces.
Engineering studies have shown
that the existing Boat Loft and
storage sheds do not use the Port's
land resources efficiently. With
the new facility the Port will
increase dry storage capacity from
320 to 500 boats and free up 101/,
12% more usable land. In February
the Commission decided to move
forward with the planning phase.
Dry storage for lower
maintenance
Each current dry moorage tenant
will be offered space in the new
facility. In addition, Port Comn-ds-
sioner Don Stay said that some
wet moorage tenants may want to
relocate to the new facility to
reduce maintenance on their
boats.The fully enclosed building
will cover approximately the same
area as the existing four rows of
sheds and will allow all the
existing parking to remain. Inside,
boats will be stacked four high.
Spaces will be provided for
tenants to work on their boats.
There will be facilities for engine
flushing and hull rinsing, a fish
cleaning station, restrooms and
showers, sewage pump -out
stations, storage and locker -rooms
and a small meeting room. Rates
in the new facility will be a few
dollars cheaper across the board
than the Port's current covered
accommodations. Tenants with
boats currently moored or stored
out in the open, however, will find
the price of being under cover *is
somewhat higher than they have
been paying.
Financially self-
supporting
Financially, the project is de-
signed to be self-supporting. It
will be funded with new issue
revenue bonds. The only tax
money used Will be for features
specifically for the general public,
mainly the public boardwalk and
pedestrian access bridge around
the launcher. This will be fully ADA
accessible and will allow the public
to watch the launching process
from an elevated vantage point.
In early March the Port held a
public meeting with current and
prospective tenants of the facility.
The various criteria and opera-
tional issues were detailed by Port
staff. All questions and objections
were addressed and, most impor-
tantly, the Port and its engineers
were able to get direct input from
users on design modifications and
operational changes.The most
intensive period of construction
activities will take about four
months and will be done in the
.off'season. All preliminary work
and approvals are expected to be
completed by September and the
entire project is scheduled to be
operational by May 1997.
Launch
Package
Those who regularly use the
Port's boat launching facility
have an opportunity to save
money.
A new launch card gives the
user six launches for the price
of five. Additionally, trailer
and vehicle parking —normally
two dollars —is free to card
holders. The cost of the card, as
with individual launches,
depends on the length of the boat
According to Port marine
services manager Dave Howard,
the promotion has worked out
well during the off season. Not
only does it encourage greater
use of the Port, but "it allows
us to give a special thank you
to our regular customers,
especially seniors," he said.
R,
W
NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN
0
ag-
a A 5z
Pa
Z2, 'a
H.
gi
F 24 R ail
US "79 a a
S,F.'
a
—82
,VA. -
a-4,,4jrZ In
ii" E, Ag
a 24F CD
-3 �H,
ag .4, —
56 ,
. 0 "
*
&
I 8 1,
R'S.= , 2
15,
Ui, -
�� - a a E�
Tol H ;8
S 5s 2
'.-- - -a
2,
I -A U.
�R
,-2 �T WA
a.
a a
:L2
NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN
0— THIS No Hcg IT IS DUE To THE QUALILY OF THE DOCUMEN , T�
9': t 194 IN I
E-�- z z z Z
Qw
FF.
A 2,
Be
Uml
0 �1�1
4,
9 a'R
RUe _0
&a a
U 6'
9,q 9%
71
4KK
rEl
5- a a
-ak-A:
T 0 E,
P
Z-
UJ
L11
-i
U 0
(n 0
Cj) LU
Lu =
-j F-
(n LL
0
U-1
CC
LL
j
z
1.- 0
Z I--
LU LU
U (j),
0
LU
F-
LL 0
z
LU U)
U) :F
F-4
z
0.1
C 0
'IJ
a]
APPLICATION ROUTING FORM FILE: SM 96-95
AND CHECKLIST FROM: PL'ANNINd
ROUTED TO:
Engineering
Fire---- .
PubllcV&�,773,11-9-6"�
Parks ex Rec. 7/31/96
Staff
RIECEIVEU
RETURNED AUG U 1 1996
Engineering PURI IC WOH 8 DEPr
Fire
Public Wo -ks
Parks ist Rec
1Y THr-cnAY- A1A1QA 4116 "'Ito
*PER WHAT SECTION OF THE CODE.2
*COMMENTS WITHOUT CITATIONS WILY!� �NSIDERE
*Additional Information Required for Complete Applicatior
*Additional Studies Required to Complete Review
• Owner PORT OF EDMONDS
• Property Address ADMIRAL -WAY
1 Date of Application 7/19/96
1 Type CONSOLIDATED PERMIT APPLICATION: SHORELINE MGT. PERMI
SHORELINE VARIANCE., a VARIANCE
Hearing Required:Yes--X— No— Date of Hearing (if known) 2LI 9/96
W
X Application _Site Plan for Short Subdivision (8.5 x 11)
X Fee X- Site Plan (11 x 17)
X APO Ust -___—Segais (Existing & Proposed)
Title Report ----Environmental Assessment
X Vicinity Map -------Proof of 2-Year occupancy (ADU)
X Elevations --.—Declarations (Variance & C. U. P.)
.Petition (Official Street Map) --A_Envimnmental Checklist
Critical Areas Determination
10
-4. j.-
X Z.
i— W
cc 2
LIJ
-j
U 0
(n 0
V) LU
ELI X
F-
LL!
0
LU
cr.
LL.
LU
z I—
1.- 0
Z F-
Uj LU
U U)
0-1
a �-
LIJ LUI
U
LL 0
z
LU U)
z
0
ME
E
APPLICATION ROUTING FORM FILE: SM-96-95
AND CHECKLIST FROM: PLANNING
ROUTED TO:
,.!.Engln�erIng`1
Fire
Public Works 7/31196
Parks 8t Rec. 7/31/96
.11Y 3 1 1996
RETURNED LL'..
Public
Parks ex Rec.
14444ji,,ji4'r
Staff Comments:SEPA CO-MENTS ARE DUE BY TUESDAL Q/ /96
*PER WHAT SECTION OF THE CODE?
*COMMENTS WITHOUT CITATIONS WILL NOT CONSIDERED
*Additional Information Required for Complete Application
*Additional Studies Required to Complete Review
e Owner, ORT OF EDMONDS
i Property Address, ADMIRAL WAY
Date of Application 7/19/96
Type—LQNSOLIDATED PERMIT APPLICATIOMLSHORELINE-MGT. PERMIT. ADB.
s Hearing Required:Yes X No— Date of Hearing (if known) 9/19/96
X
—Application
X
Fee
x
—APO Ust
Title Report
X
—Mcinity Map
X
—Elevations
Petition (Official Street Map)
Critical Areas Determination
Site Plan for Short Subdivision (8.5 x 11)
2�—Site Plan (11 x 17)
------j.egals (Existing & Proposed)
_Environmental Assessment
----2roof of 2-Year Occupancy (ADU)
. . ............... Declarations (Variance & C. U. P.)
—L_Environmental Checklist
Cn U.
LU 0
LL
LO
X:
z
01
z
LU W;
2 =)!
:D Oi
U
0
a
LU LUI
M L)
0
z
LU Lt)
0
z
0 i
PE
Subject: Consolidated permit application for the Port of
EdMMd-$-(SM-96-95)
The application has been received by the Engineering Division. It is not
possible to ascertain if this is a complete application at this time. We note that
Exhibit F referred to in the application is not part of the package we received. I
will be unable to have the application fully reviewed by the August 6 deadline.
Construction season and scheduled vacation reduce personnel availability. I note
the application was submitted on July 18, and it has taken fully two weeks to have
it routed to other Divisions for comments. It is unrealistic to expect comments be
returned in half the time it took to get the application routed.
We expect that comments can be forwarded from the Engineering Division by
August 21, 1996.
MY OF EDMONW
ENGEqEEMG DMIMON
SM96095DOC
0,
Z.
LU
LLJ
0
Cn Q
in L11
LU
-i
(n LL
0
W
cc
Ln a
z i-
1.- 0
Z
LU 14.1
0
c) 1-
UJ LU
�L- 0
z
Uj Cn
0 -±
F-
0
z
Ir
01
z 0
L01
C`�
APPLICATION ROUTING FORM FILE: SM-96-95.
AND CHECKLIST FROM: PLANNING
ROUTED TO: RETURNED
Engineering . 7131/96 Engineering
Fl 7/31/96 Fire
Public Works-ZL31L26 Public Works
Parks ex Rec. 7/31/96 Parks ex Rec
Staff Comments:SEPA COMMENTS ARE ESPAL 8/6/96
*PER WHAT SECTION OF THE CODE?
*COMMENTS WITHOUT CITATIONS WILL NOT CONSIDERED
*Additional Information Required for Complete Application
*Additional Studies Required to Complete Review
* Owner
Property Address ADMIRAL WAY
Date of Application 7/19/96
Type —CONSOLIDATED PERMIT APPLICATION: SHORELINE MGM -PERMIT. ADB.
* Hearing Required:Yes X No— Date of Hearing (if knciwn)-2LL2L26_
X
_Application
X
Fee
X
-APO List
Tide Report
X
-Vicinity Map
X
-Elevations
Petition (Official Street Map)
Critical Areas Determination
_Site Plan for Short Subdivision (8.5 x 11)
--��—Site Plan (I I x 17)
Legals; (Existing & Proposed)
_Environmental Assessment
-----2roof of 2-Year Occupancy (ADU)
_Declarations (Variance & C. U, P.)
--.K_Environmental Checklist
<:, S t . 19 9 *)
CITY OF EDMONDS
250 STH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works - Planning a Parks and Recreation * Engineering
BARBARA FAHEY
MAYOR
`k I.- �
Z-
VIA FAX (774-7837)
AND U.S. MAIL
(n
U) UJ
LUX
Cn LL i
0
July 22, 1996
LL <
Mr. William Toskey
=)i
Executive Director
X Lu.
Port of Edmonds
�- X
z F-
336 Admiral Way
1,- 0
Edmonds, WA 98020
Z F-
Lu UJ
2 =)
:) a
U rn
Subject: ENVIRONMENTAL DETERMINATION FOR CONSOLIDATED PERMT
0
APPLICATION FOR NEW DRY STACK STORAGE FACILITY AND MARINA
0
Lu
IMPROVEMENTS
�L- 0
z
Dear 1�4r. Toskey:
..
uj cn
T
F-
0
I have just reviewed your new permit ap lication which was submitted in the late afternoon on
p
z
July l9th, including the environmental determination issued by the Port for the proposed Dry
Stack Storage facility and other Marina improvements.
The Port, acting in the role of lead agency, issued a Mitigated Determination of Nonsignificance
on July 15, 1996, with the 15-day comment period expiring on July 29, 1996 (see Enclosed). The
actual determination was not delivered to the City of Edmonds until late afternoon (approximately
3:00 PNI) on Friday July 19th, thus effectively eliminating half of the mandatory review time for
other agencies with jurisdiction.
The Port, as Lead Agency, is responsible for following the procedural requirements of the State
01 Environmental Policy Act when issuing an Environmental Determination. Specifically, pursuant
to WAC 197-11-340(2)(b): "Yhe responsible official shall send the DNS and enQi6nmental
checklist to agencies with jurisdiction, the department of ecology, and affected tribes, and each
local agency or political subdivision whose public services would be changed as a result of
implementation of the proposal, and shall give notice under 197-11-510. " Furthermore,
pursuant to WAC 197-11-340(2)(d): "The date of issuefor the DNS is the date the DNS is sent
to the department of ecology and agencies with jyrisdiction and is made publicly available. "
Additionally, it is unclear when the Port actually sent copies of the Mitigaied Determination of
Nonsignificance to the other listed agencies and tribes in order to allow them to comment.
Furthermore, based on the list provided on the second.page of your determination letter, it does
not appear that the Tufalip Tribe was fisted for notification.
Therefore, given that the determination was not officially transmitted to the City of
Edmonds until July 19th, I am requesting that the Port, as Lead Agency, provide written
NPORT�LDOCW-JUL-% Incorporated August 11, 1890
CDRRWAC;ENCY
Sister Cities International — Hekinan, Japan
0
clarification that the official date of issuance is July 19th, and the 15-day comment period
shall run from that date. Therefore, with the date of issuance being July 19th, the official
15-day comment period does not expire until August 2, 1996, or 15 days after all affected
agencies were issued this environmental determination. Your written response should also be
z
forwarded to all agencies, tribes and parties fisted on the second page of your determination letter.
LU;,
As the City has not been left with a great deal of time to review and comment on the Mitigated
Determination of Nonsignificance issued by the Port of Edmonds, I am requesting that you
0!
provide a written response by 4:00 PM on July 23rd to the City's request for an extension to the
comment period until Augusi 2nd.
LUI
If you have any further questions regarding this matter, please do not hesitate to contact me at
T UO.
LU
771-0223.
L,
Sincerely,
D
Cn
Community Services Department - Planning Division
Lui
Xt
z
j7-
z
Jeffrey S. Wilson, AICP
Current Planning Supervisor
U CAI
0 ;7-
Enclosures: 1) Mitigated Determination of Nonsignificance issued by the Port of Edmonds
0
on July 15, 1996
LU
2) WAC 197-11-340
U. 0!
ZI
pc: Vfile No. SM-96-95
LU Uy
Mayor Fahey
Scott Snyder, City Attorney
0
z
Paul Mar, Community Services Director
Rob Chave, Planning Manager
Department of Ecology
Department of Ecology - Shorelands, Division
Mr. Gerald Hansmire, NLAKERS, Smith Tower, Second Avenue, Seattle, WA 98104
0
Pap 2 Of2
%POIttI,DOCa2-)UL,96
CORREYAGENCY
X
0 LW
LU Proponent: Port of Edmonds
-J
Cn LL
LU 0 Location of proposal, including street'address if any: In southern Portion of Port property
Lead agency: Port of Edmonds
LL
D
U) The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the
UP environment. An environmental impact statement is not required under RCW 43.21.030(2Xc). This decision was
:E' I made after review of a completed environmental checklist and other information on file with the lead agency. This
z
1.- 0! information is available to the public on request.
Z �-'!
LU Lui
'S D! There is no comment period for this DNS.
5 Oi
0
0 t —X— This DNS is issued under 197-11-340(2); the lead agency will not act on this -proposal for 15 days
UJ LU from the date below. 'Comments must be submitted by 15 days after issue of the DNS per WAC
X U", 197-11--340(2)(a).
�- 1-i
0!�
zi Responsible Official: Bill Toskey
di (A[
Position/Title: Executive Director
z Phone: (206) 774-0549
Address: 336 Admiral Way, Edmonds, WA 98020
Date: L Signature:
You may appeal this determination to Port of Edmonds Commissioners, 330 Admiral Way, Edmonds,
WA 98020, no later than 30 days after issue, by filing a written appeal*citing the reasons, per WAC
197-11-680(4)(c).
. V 11 You should be prepared to make specific. factual objections. Contact William Toskey or ask about the procedures
for S.EPA appeals.
KII]
P89e I of 7
Z*
LU
cr
0
Cn a
U) LU
UJ 3:
_J F-.
Cn LLi
0
LU
LL
z
�_ 0
Z I—
LU LU
n
cn,
0—
a p
UJ
�L_ 0
z
tn
ZF
0 1
z
E
E 0
SEPA Rules Part Three-197-11-350
(i) Adversely affect environmentally sensitive or spe-
cial areas, such as loss or destruction of historic, scien-
tific, and cultural resources, parks, prime farmlands,
wetlands, wild and scenic rivers, or wilderness;
(ii) Adversely affect endangered or threatened species
or their habitat;
(iii) Conflict with local, state, or federal laws or re-
quirements for the protection of the environment; and
(iv) Establish a precedent for future actions with sig-
nificant effects, involves unique and unknown risks to
the environment, or may affect public health or safety.
(4) If after following 197-11-080 and 197-11-335
the lead agency reasonably believes that a proposal may
have a significant adverse impact, an EIS is required.
(5) A threshold determination shall not balance
whether the beneficial aspects of a proposal outweigh its
adverse impacts, but rather, shall consider whether a
proposal has any probable significant adverse environ-
mental impacts under the rules stated in this section. For
example, proposals designed to improve the environment,
such as sewage treatment plants or pollution control re-
quirements, may also have significant adverse environ-
mental impacts.
WAC 197-11-335 Additional information. The lead
agency shall make its threshold determination based
upon information reasonably sufficient to evaluate the
environmental impact of a proposal (197-11-055(2) and
197-11-060(3)). The lead agency may take one or more
of the following actions if, after reviewing the checklist,
the agency concludes that there is insufficient informa-
tion to make its threshold determination:
(1) Require an applicant to submit more information
on subjects in the checklist;
(2) Make its own further study, including physical in-
vestigations on a proposed site;
(3) Consult with other agencies, requesting informa-
tion on the proposal's potential impacts which lie within
the other agencies' jurisdiction or expertise (agencies
shall respond in accordance with 197-11-550); or
(4) Decide that all or part of the action or its impacts
are not sufficiently definite to -.allow environmental
analysis and commit to timely, subsequent environmen-
tal analysis, consistent with 197-11-055 through 197-
11-070.
WAC 197-11-340 Determination of nonsignificance
(DNS). (1) If the responsible official determines there
will be no probable significant adverse environmental
impacts from a proposal, the lead agency shall prepare
and issue a determination of nonsignificance (DNS)
substantially in the form provided in 197-11-970. If an
agency adopts another environmental document in sup�-
port of a threshold determination (Part Six), the notice
of adoption (197-11-965) and the DNS shall be com-
bined or attached to each other.
(2) When a DNS is issued for any of the proposals
listed in (2)(a), the requirements in this subsection shall
be met.
(a) An agency shall not act upon a proposal for fif-
teen days after the date of issuance of a DNS if the
proposal involves:
(i) Another agency with jurisdiction;
(ii) Demolition of any structure or facility not ex-
empted by 197-11-800(2)(f) or 197-11-880;
(iii) Issuance of clearing or grading permits not ex-
empted in.Part Nine of these rules; or
(iv) A DNS under 197-11-350(2), 197-11-350(3) or
197-11-360(4).
(b) The responsible official shall send the DNS and
environmental checklist to agencies with jurisdiction, the
department of ecology, and affected tribes, and each lo-
cal agency or political'subdivision whose public services
would be changed as a result of implementation of the
proposal, and shall give notice under 197-11-510.
(c) Any person, affected tribe, or agency may submit
comments to the lead agency within fifteen days of the
date of issuance of the DNS.
(d) The date of issue for the DNS is the date the
DNS is sent to the department of ecology and agencies
with jurisdiction and is made publicly available.
(e) An agency with jurisdiction may assume lead
agency status only within this fifteen -day period (197-
11-948).
(f) The responsible official shall reconsider the DNS
based on timely comments and may retain or modify the
DNS or, if 'the responsible official determines that sig-
nificant adverse'impacts are likely, withdraw the DNS
or supporting documents. When a DNS is modified, the
lead agency shall send the modified DNS to agencies
with jurisdiction.
(3)(a) The lead agency shall withdraw a DNS if.
(i) There are substantial changes to a proposal so that
the proposal is likely to have significant adverse envi-
ronmental impacts;
(ii) There is significant new information indicating, or
on, a proposal's probable significant adverse environ-
mental impacts; or
(iii) The DNS was procured by misrepresentation or
lack of material disclosure; if such DNS resulted from
the actions of an applicant, any subsequent environmen-
tal checklist on the proposal shall be prepared directly
by the lead agency or its consultant at the expense of the
applicant.
(b) Subsection (3)(a)(ii) shall not apply when a non-
exempt license has been issued on a private project.
(c) If the lead agency withdraws a DNS, the agency
shall make a new threshold determination and notify
other agencies with jurisdiction of the withdrawal and
new threshold determination. If a DS is issued, each
agency with jurisdiction shall commence action to sus-
pend, modify, or revoke any approvals until the neces-
sary environmental review has occurred (see also 197-
11-070).
WAC, 197-11-350 Mtigated DNS. The purpose of
this section is to allow clarifications or changes to a pro-
posal prior to making the threshold determination.
[CL 197-11 WAC--P 71
0
LL
Uj
3:
z �-
�- 0
Z �-
LLI LU
0-
0 t:
LU LL
LL c
LU
0
z
01
t 0
-rc:l: OAXE -rF%^NSMI-rrer>:L--C
NUMBr=R or- PAcass---,C--
(Including <�-over Page)
lROCAPIOnts 'relechopier Number:
FAOSIMILM
^UtornatIc/oroup It
(2.3 mIna.); (Br=up III
FROM: �_Jsotft If there are any problem&
cluring tronsmisolc>n c:)r
V-1nat, rn�. claournento are receKeoO
1!�ocn, lete.eloose call
1200)-P-71-0 20 and asK
Sonder'% -relecQpler Numben (208) 771-0221
Re. -c- F—=r pt�A
Sister C' itlom Internarinool Hakinan. Japan
------------
TRANSMISSION REPORT
THIS DOCUMENT (REDUCED SAMPLE ABOVE)
WAS SENT
** COUNT
# 6
*** SEND ***
NO
REMOTE STATION I.D.
START TIME
DURATION
#PAGES
COMMENT
'1
97747837
7-22-98, 3;15PM
y) LL
LU 0
2 �
C2
L,
L.0
z I--
�- 0
Z �-
W LU
LU LL
F-
LL C
LU
L)
0
z
0
Sender's Telecopier Number: (206) 771-0221
RE: S' G Oft:kev- th tt%-6.-kaz, -Gy- V!x
dm
DADkWorddatakFaxForm-
*. Incorporated August 11, 1890 *
Sister Cities International — Hekinan, Japan
4�' St. 1 89\)
CITY OF EDMONDS BARBARA FAHEY
250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works 9 Planning 0 Parks and Recreation * Engineering
--k I.- ,
Z�
LU
cc
VIA FAX (774-7837)
0
a
AND U.S. MAIL
U) UJ
uJ
-J
Cn U.
July 22, 1996
LU 0
LL <
Mr. William Toskey
Executive Director
LU
Port of Edmonds
z I-
336 Admiral Way
l.- 0
Edmonds, WA 98020
Z �-
Lu LU
2 =)
:) 0
U tn.
Subject: ENVIRONNffiNTAL DETERMINATION FOR CONSOLIDATED PERMIT
0—�
APPLICATION FOR NEW DRY STACK STORAGE FACILITY AND MARINA
a k= t
EvIPROVENMNTS
LU Lu� ,
U- 0
z
Dear Mr. Toskey:
Lu (n
I have just reviewed your new permit application which was submitted in the late afternoon on
0
July l9th, including the environmental determination issued by the Port for the proposed Dry
Stack Storage facility and other Marina improvements.
The Port, acting in the role of lead agency, issued a Mitigated Determination of Nonsigrilficance
on July 15, 1996, with the 15-day comment period expiring on July 29, 1996 (see Enclosed). The
actual determination was not delivered to the City of Edmonds until late afternoon (approximately
3:00 PM) on Friday July 19th, thus effectively eliminating half of the mandatory review time for
other agencies with jurisdiction.
The Port, as Lead Agency, is responsible for following the procedural requirements of the State
Environmental Policy Act when issuing an Environmental Determination. Specifically, pursuant
0 to WAC 197-11-340(2)(b): "7he responsible official shall send the DNS and environmental
checklist to agencies with jurisdiction, the department of ecology, and affected tribes, and each
local agency or political subdivision whose public services would be changed as a result of
implementation of the proposal, and shall give notice under 197-11-510. " Furthermore,
pursuant to WAC 197-11-340(2)(d): "Yhe date of issuefor the DNS is the date the DNS is sent
'on
he de a inien e ' g" a� a enc 'es wi h and is made publicly available.
g
ar e Port actually sent copies of the Mtigated Determination of
to p r 0 co
t when
fi an r I t
I the isted agencies and nbes in order to allow them to comment.
Ad on Uy is e
" a ' t u c' s
0 Nonsi I c ce to tie 0
F urt or s lis s co p 0
herm e ba ed on the rovided on the e nd age of your determination letter, it does
Ot pp t t th Tul lip T p
ar n s list f
n a e ha e a be wa ed or notification.
Therefore, given that the determination was not officially transmitted to the City of
Edmonds until July 19th, I am requesting that the Port, as Lead Agency, provide written
%PORT - I.Doco-JuEm 0 Incorporated August 11, 1890 *
CORP"AG&VCY Sister Cities International — Hekinan, Japan
j,
clarification that the official date of issuance is July 19th, and the 15-day comment period
shall run from that date. Therefore, with the date of issuance being July 19th, the official
15-day comment period does not expire until August 2, 1996, or 15 days after all affected
agencies were issued this environmental determination. Your written response should also be
z forwarded to all agencies, tribes and parties listed on the second page of your determination letter.
LUUj;;
cc 2� As the City has not been left with a great deal of time to review and comment on the Mitigated
Determination of Nonsignificance issued by the Port of Edmonds, I am requesting that you
L4 U�
U 0: provide a written response by 4:00 PM on July 23rd to the City's request for an extension to the
Cn all .11 comment period until August 2nd.
CD LUI
LU 3:1
-i �-i If you have any further questions regarding this matter, please do not hesitate to contact me at
Cn U.1
�U- 771-0223.
:3 Sincerely,
U-
Community Services Department - Planning Division
uj�
z P!
JeffTey S. Wilson, AICP
W; Current Planning Supervisor
0!
Enclosures: 1) Mitigated Determination of Nonsignificance issued by the Port of Edmonds
0 t= on July 15, 1996
LU D
X 2). WAC 197-11-340
ILL
0!
z! pe: File No. SM-96-95
Mayor Fahey
PE Scott Snyder, City Attorney
0
z Paul Mar, Community Services Director
Rob Chave, PI ng Manager
Department of Ecology
Departme of Ecology - Shorelands Division
Mr Geral annsmire, MAKERS, Smith Tower, Second Avenue, Seattle, WA 98104
A
N, 0
Ste
Psp 2 of 2
(a U-1
LU 01
2��
g :3
LL
Ln 0,
LU
z 1--:
Lu UJ'
U U)
0;7-1
a—
Ui UJI
U- 0
z
Lu Cn
0
z
RE
rullk-A kir
3M ADMIRAL WAY, EDMONDS, WA M20 J U L 19 1996
RCW 197-11-970 Determination of Nonsignificance (DNS)
MITIGATED DETERMINATION OF NONSIGNIFICANCE
Description of proposal: Port of Edmonds Dry Stack Boat Storage Facility� Pedestrian Boardwalk/Look-out,
adjacent commercial/office addition
Proponent: Port of Edmonds
Location of proposal, including street address if any: In southern portion of Port property
Lead agency: Port of Edmonds
The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the
environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was
made after review of a completed environmental checklist and other information on file with the lead agency. This
information is available to the public on request. I
There is no comment period for this DNS
X This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days
from the date below. Comments must be submitted by 15 days after issue of the DNS per WAC
197-11-340(2)(a).
Responsible Official: Bill Toskey
Position/Title: Executive Director
Phone: (206) 774-0549
Address: 336 Admiral Way, Edmonds, WA 98020
Date: Ir Signature:
You may appeal this determination to Port of Edmonds Commissioners, 330 Admiral Way, Edmonds,
WA 98020, no later than 30 days after issue, by filing a written appeal *citing the reasons, per WAC
197-11-680(4Xc).
You should be prepared to make specific factual objections. Contact William Toskey or ask about the procedures
for SEPA appeals.
V5020NS.00C - NISM
Page I of 7
z
X
Cl) —
U) LU
Uj
(j) LL
L —0
U
LL
M
T)
X
z
LU LU
L) cr,
0—
U.
2
LU U
F
z
01
Mailed to the following along with the Environmental Checklist:
City of Edmonds
2327034-011-0008
250 5th Avenue N.
Union Oil Company
Edmonds, WA 98020
P.O. Box 7600
Los Angeles, CA 90051
Environmental Review Section
Department of Ecology
232703-1-057-0009
P. 0. Box 47703
Burlington Northern Railroad Co.
Olympia, WA 98504-7703
777 Main Street
Fort Worth, TX 76102
Washington State Dept of
Transportation
2327034-003-0008
TSM&P/Land Developer
Harold R. Stone & L. Ardean
15700 Dayton Avenue North
14277 Worden Way
Seattle, WA 98133
Saratoga, CA 95070
Community Transit
2327034-013-0006
Attn: Marvin Freel
Margaret B. Vorwick Trust
1133 164th Street Southwest� 9200
do Brice inv. Realty
Lynnwood, WA 98037
9450 SW Commerce Circle
Wilsonville, OR 97070
Burlington Northern Railroad
2900 Bond
Trouts Ln. Limited
Everett, WA 98201
Larry Johnson
1212 NE 65th Street
232703-1-045-004
Seattle, WA 98115-6724
ESC Associates
3131 E. Madison Street� Suite 202
Seattle, WA 98112
MITIGATING MEASURES INCORPORATED INTO THE PROPOSAL:
In order to mitigate the potential impact of the requested height variance for the proposed dry boat
storage shed this proposal contains the mitigation measures.
See the following attachments
9602ONSDOC-7115M
Page 2 of 7
X
z
UJ
0
cn 0
U) LU
LU
_J
LL;
-0,
LU
LL
31
D 0
x L,
�- -F
z
Z
LU LU
n
0
0
a
LU
3:
!i- 0
z
LU in
0
z
E
t 0
SEPA Rules Part Three-197-11-350
(i) Adversely affect environmentally sensitive or spe-
cial areas, such as loss or destruction of historic, scien-
tific, and cultural resources, parks, prime farmlands,
wetlands, wild and scenic rivers, or wilderness;
(ii) Adversely affect endangered or threatened species
or their habitat;
(iii) Conflict with local, state, or federal laws or re-
quirements for the protection of the environment; and
(iv) Establish a precedent for future actions with sig-
nificant effects, involves unique and unknown risks to
the environment, or may affect public health or safety.
(4) If after following 197-11-080 and 197-11-335
the lead agency reasonably believes that a proposal may
have a significant adverse impact, an EIS is required.
(5) A threshold determination shall not balance
whether the beneficial aspects of a proposal outweigh its
adverse impacts, but rather, shall consider whether a
proposal has any probable significant adverse environ-
mental impacts under the rules stated in this section. For
example, proposals designed to improve the envir ' onment,
such as sewage treatment plants or pollution control re-
quirements, may also have significant adverse environ-
mental impacts.
WAC 197-11-335 Additional information. The lead
agency shall make its threshold determination based
upon information reasonably sufficient to evaluate the
environmental impact of a proposal (197-11-055(2) and
197-11-060(3)). The lead agency may take one or more
of the following actions if, after reviewing the checklist,
the agency concludes that there is insufficient informa-
tion to make its threshold determination:
(1) Require an applicant to submit more information
on subjects in the checklist;
(2) Make its own further study, including physical in-
vestigations on a proposed site;
(3) Consult with other agencies, requesting informa-
tion on the proposal's potential impacts which lie within
the other agencies' jurisdiction or expertise (agencies
shall respond in accordance with 197-11-550); or
(4) Decide that all or part of the action or its impacts
are not sufficiently definite to -.allow environmental
analysis and commit to timely, subsequent cnvironmen-
tal analysis, consistent with 197-11-055 through 197-
11-070.
WAC 197-11-340 Determination of nousignificance
(DNS). (1) If the responsible official determines there
will be no probable significant adverse environmental
impacts from a proposal, the lead agency shall prepare
and issue a determination of nonsignificance (DNS)
substantially in the form provided in 197-11-970. If an
agency adopts another environmental document in sup-
port of a threshold determination (Part Six), the notice
of adoption (197-11-965) and the DNS shall be com-
bined or attached to each other.
(2) When a DNS is issued for any of the proposals
listed in (2)(a), the requirements in this subsection shall
be met.
(a) An agency shall not act upon a proposal for fif-
teen days after the date of issuance of a DNS if the
proposal involves:
(i) Another agency with jurisdiction;
(ii) Demolition of any structure or facility not ex-
empted by 197-11-800(2)(f) or 197-11-880;
(iii) Issuance of clearing or grading permits not ex-
empted inPart Nine of these rules; or
Ov) A DNS under 197-11-350(2), 197-11-350(3) or
197-11-360(4).
(b) The responsible official shall send the DNS and
environmental checklist to agencies with jurisdiction, the
department of ecology, and affected tribes, and each lo-
cal agency or political* subdivision whose public services
would be changed as a result of implementation of the
proposal, and shall give notice under 197-11-5 10.
(c) Any person, affected tribe, or agency may submit
comments to the lead agency within fifteen days of the
date of issuance of the DNS.
(d) The date of issue for the PNS is the date the
DNS is sent to the department of ecology and agencies
with jurisdiction and is made publicly available.
(e) An agency with jurisdiction may assume lead
agency status only within this fifteen -day period (197-
11-948).
(f) The responsible official shall reconsider the DNS
based on timely comments and may retain or modify the
DNS or, if the responsible official determines that sig-
nificant adverse*impacts are likely, withdraw the DNS
or supporting documents. When a DNS is modified, the
lead agency shall send the modified DNS to agencies
with jurisdiction.
(3)(a) The lead agency shall withdraw a DNS if-
(i) There are substantial changes to a proposal so that
the proposal is likely to have significant adverse envi-
ronmental impacts;
(ii) There is significant new information indicating, or
on, a proposal's probable significant adverse environ-
mental impacts; or
(iii) The DNS was procured by misrepresentation or
lack of material disclosure; if such DNS resulted from
the actions of an applicant, any subsequent environmen-
tal checklist on the proposal shall be prepared directly
by the lead agency or its consultant at the expense of the
applicant.
(b) Subsection (3)(a)(ii) shall not apply when a non-
exempt license has been issued on a private project.
(c) If the lead agency withdraws a DNS, the agency
shall make a new threshold determination and notify
other agencies with jurisdiction of the withdrawal and
new threshold determination. If a DS is issued, each
agency with jurisdiction shall commence action to sus-
pend, modify, or revoke any approvals until the neces-
sary environmental review has occurred (see also 197-
11-070).
WAC. 197-11-350 Mitigated DNS. The purpose of
this section is to allow clarifications or changes to a pro-
posal prior to making the threshold determination.
JCL 197-11 WAC--p 71
8, 1996. A copy of this letter will be included in the agency packages.
Please contact Geralyn Sander if you have any questions. I will be out of town until July
29,1996.
E 0 tA 0 N D S
=6 AOMMAL WAY
ZDf40NDS.WASWaMNWM0-i'214
1206)774-0549
PAX(2061774-Mr JUL 2 1996
VIA FAX 771-0221 UePT.
AND US. MAIL
July 22,1996
Jeffrey S. Wilson, AICP
City ofEdmonds Planning Department
250 56 Ave N
EdMonds. WA 99020
w
Subjoin: ENVIFtONMENTAL DrsTMADTATION FORL C014SOLMATED PERMU
AppLCIATION FOR NEW DRY STACK STORAGE FACnxrY AND MARINA
MPOVEhIENTS
-% 11
e ! Dav Mr, Wilson:
ZI
This letter responds to your July 22, 1996 fax. As Geralyn Sander discussed m4th you by
phone on July 22, we experienced technical difficulties in putting together the DNS and
0 enviromnental checklist packages for both the City of Fdmonds and dioibution to
z
4800016e. We delivered the CiWs paekaSe late on July 19, agency packages willbe sent
overnight express on Tuesday afternoon, July 23, to include Tulalip, Tribes. Therefbre� the
officW date of issuance -will be July 24, and the 15-day comment pexiod will expire August
8, 1996. A copy of this letter will be included in the agency packages.
Pleaw contact Geralyn Sander ifyou have any questions. I will be out of town until July
29,1996,
sincerdy,
0,
tfi, T
0
Executive Director
TOTAL P.01
0
=PORT
OF RECEIVED
E D M 0 H D S
336 ADMIRAL WAY JUN 17 19%
EDMONDS. WASHINGTON98020-7214 r-XICES
(206) 774-0549
FAX (206) 774-7837
June 17, 1996
Paul Mar
city of Edmonds
250 Fifth Ave N
Edmonds, WAI 98020
Dear Pau
This let er is a follow-up to our joint meeting on June 13. 1
thank you for your participation and willingness to involve
appropriate City staff to assist in a full range of discussions
related to the Port's future plans, particularly the stack
storage facility. I believe the meeting was very helpful to Port
staff and consultants and we will work very hard to meet the
City's expectations in the permit application process.
Specifically, we will make the following commitments to help move
this project along:
• Consider providing restrooms for the Marina Beach Park.
patrons.
• Modify the parking in the south Port area to provide
designated spaces for Marina Beach patrons sufficient to
compensate for the loss of parking on Port property.
• Provide clear walkway and pedestrian facilities from
Marina Beach Park north to Olympic Beach Park.
• Work with the City staff to prepare vegetation,
architectural features, and structural adjustments to
mitigate the visual impacts of the facility.
• Provide additional documentation showing the view impacts
from various locations throughout the Edmonds bowl.
• Continue to develop requirement documentation for the*
facility and the impacts of feasible alternatives.
• Incorporate City building code requirements into the
various features of the complete storage facility.
0,
C31,
Z
<
X Z:
�_ Lg
O�
Lu..
LU
(n LL
0
UJ
LL <
31
UJr
Z
O�
LU W�
L) (I)i
0
0
W LU
LL
Z!
MI
0
Z
T-7
0
the impacts during construction.
Conduct technical one-on-one meetings with appropriate
members of the City staff and ensure that all prepared
documents and permits meet the City's expectations.
Prepare parking and traffic plans appropriate for the
long range known requirements of the Port.
Update and revise the Port Master Plan in accordance with
the City comprehensive Plan.
The Port will'take the -.above actions and all other actions,
necest;ary td. Onsure -the Port staff cind itb consultants ara* -
working closely with City'staff on -this and related*ptojects.
We appreciate the City staff's underdtanding-of.our need to
expedite this project in order to minimize disruptions to the
public's use of the community's waterfront facilities.
Again, I thank you for your cooperative approach to the Port's
permitting issues. We look forward to members of your staff
assisting the Port with early notification of important issues
and helping to identify mutually acceptable alternatives.
�-%. 'Toskey
ve Director
0
z 11
LLJ'
LiJ U
_J 0
U) LU
LLJ
(n LL
LU
CC <U_
Ln
X LLI
z
0
� I
LU LU
0-1
a �-
LLI LUI
z
UJ U)
z
to
Auquat 7, 1996
William M. Tookey
Executive Director
Port, of Edmonds
336 admiral way
Edmonds, WA 98020
Subject- Proposed (
checklist
Dear Mr. Toskey.
As a member of the
would,like to comn
I
stacked storage facility aRPA environmental
)nds Laebugten Chapter of Trout Unlimited, T
on several items in your sEPA checklist;
Section 3. water ( ) (1) - The wetland you refer to as "name
unknown" is the Edmomds/union Oil Marsh, and the stream connecting
the wetland eo Pu Sound is Willow Creek or Shellabarger Creek
(City of Edmonds o . ehensive Plan Draft EIS, May 1995 .
Your statement that "neither the stream culvert nor *the wetland
area axe disturbed by this project" does not appear to be
consistent with tha plans you are presenting. it is my
understanding that t e project is going to be constructed either on
top of or adjacent to the stream culvert. The plan should
aKpropriately show the exact location of the culvert, in light of
t a possibility that during the onstruction period heavy equipment
or grading coul ause tal portion of the culvert to
collavae.
Section 3. water (2). ' "Will the project require any work over, in$
or adjacent to (with:'n 200 feet) of the described waters? if yes,
please describe and attach available plans. n No mention is made of
the stream here --a s�gnificant omission.
Section 5. Animals ( ) . 11 ... any birds and animals which have been
observed on or near the site or are known to be on or near the
site.ff Coho salmon, chum salmon, and searun cutthroat are not on
your list. These are also significant omissions. During the last
three years, coho almon have been returning to this area in
increasing numbers. Last year, over 80 adult coho salmon made the
journey through the culvert off the beach up to and through the
marsh to reach Willow Creek. Several chum salmon were counted in
this group. Since vre know that. many fish did not make it across
r
0
FROM t2*-622-6398 T
(7)
2067710221 199re-07 11136 #Sse P.03
William Tookey
August 7, 1996
Page 2
the march, we know
that a much larger number passed through the
z
<
marina area.
= zJ
F_ ul
CC 2
section 3. Animals (c).
"is the site part of a migration route?n
< :)
if adult spawning a
mon and searun cutthroat are swimming under i
LU 0
_J 01
your proposed facility,
I would have to disagree with your "non
U 0,
answer.
W U LU,
W
_J
As noted In the Draft
Environmental impact statement for the
Cn LL
Comprehensive Plant :!Or
the City of 5dmonds, "The marine habitat,
W01
both Intertidal and
djacent open water, is important to migrating
waterf low and other u
ater birds, sea lions, and ealmouids and other
fish species.,, This
would include both the chum and cobo salmon,
LL <
=)I
as well as the searun
cutthroat --a Washington priority fish.
0,
moreover, many speci2s
of waterfowl are commonly sighted in this
Lu.
X
area. I personally
of a sighting of a marbled murlette in the
boat harbor as recently
as July 20, 1996.
z
Section S. Animals (d).
"Proposed measures to preserve or enhance
W LU
wildlife." I do not
understand your response that such measures
are "not applicable.
Given the plethora oir wildlife currently
0
living and reproducirg
in the marsh and stream, a preservation plan
0
is not only applicable
but necessary.
W
9ur concerns about
--his proposed facility are centered on the
�L_ 0
impact--bQth near-
d long -term --that this project will have on
z
the Edmonds/Union 01
Marsh and the outfall of this wetland. To
LU 0)
UY
preserve and enhance
wildlife, we propose.daylighting the outfall
15 �-
at this time. Becaus
3 habitat restoration is vital to the recovery
z
of salmon runs, and
5almon fishers are an important part of Port
activity, the Port would
also benefit. :Ef the outfall is left
culverted, and if th
intermodal terminal is built in conjunction
with the relocatio
f the ferry, the outfall from the marsh would
be boxed in with ven
little chance of ever coming to daylight, to
the long-term detriment
of the health of the wetland and intertidal
area.
Tt would be a tragic
loss if the Port builds a storage facility at
the cost of damagi
an irreplaceable resource. While the
environmental checklist
is a guide to assure this does not happen,
it is useful only if
the questions are seriously and thoughtfully
0
addressed. Your cur
gory and incomplete answers raise disturbing
questions about the Port's
commitment to the City's comprehensive
I
plan and to the pr
servation of our area a priceless natural
resources.
i
Very truly yours
W CLae-"_
Walter R. Thompson
0
MAILBOXESE=
q16 NE 65th
Seatde, WA 98115
Date:
To:
Pax No
From: Z/"—
Phone No:
# of Pages ncluding
Message:
77219 e 3
this sheet): -
V
Ise 12! 444.-1
A'd
Copy Service a Fun 3ervice mauvox= INVrary
Fax Service v Complete Packing & Buslneu Printing
Shipping Servicei
Office Supplies # Mailing Services No -Limit Shipping'"
* Etc...
01994 NIIIII BQX2& Etc!
PO�'T'AL, Bia�INJ.-B AND Cog
916 NE 65th. Seattle, %Va;hIngton 98115 Tel 206 522-9752 Fax 206 522-5398
.%N j,4*4r-AHV9HTLV OWNtU " . p OFIRATtD FRANCHM
X Z.
I-- LU
X
_J
(-)0'
LU
LU
_J
(n LL
01
LL <I
0
UJ
3:
Z I'_
1.- 0
Z I
U.1 LLI
L) Cn
C)
LLI UJI
X L)
F- r-
LL 0
Z
UJ (1)
0
Z
M
Stephen E. Beck, Jr.
520 Alder Street
Edmonds, WA 98020-3414
(206)771-1234
August 6, 1996
Mr. Bill Toskey
Executive Director
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
RE: Land Use Application; Dry Stack Storage Facility
Dear Mr. Toskey:
RECEIVED
AUG - 9 1996
COMMUNITY SERVICES
DIRECTOR
I have recently become aware and have been able to obtain a copy of subject application to the
City of Edmonds. I am concerned with some of the material contained in this document. My
concerns pertain specifically to those matters relating to Aesthetics and Water as contained in
the Environmental Checklist and the Exhibits contained therein..
I wish to express my concerns as to the aesthetics of this project, first. The photographs con-
tained on Page 6 of the Mtigated Determination of Nonsignificance and Page 19 of Exhibit ##D11,
as well as the artists line drawing on Page 9 of the same exhibit, were taken from a position di -
redly in front of my residence located on Alder Street between 5th and 6th Avenues South. My
present view of the Port of Edmonds includes the piling structure which comprises the 2-Hoist
launch facility for dry storage tenants. I estimate this structure to 201 in height. The height of the
proposed structure is projected to be 45, over two times the height of the present structure, and
of a closed, warehouse -type construction, This would significantly affect the view of the water-
front and Puget Sound, for not only myself, but also for 2000-3000 other residents of thePort
District. Comparison of this structure to that of a petroleum storage facility is not a valid com-
parison. A petroleum tank would probably be 69-80'in width and.of cylindrical configuration
and represent less than 3000 sq.ft. of view incursion. The proposed Dry Stack Facility, on the
other hand, would create an Eastern wall profile of 320X45, or over 14,000 sq.ft. of flat surface,
plus the roof areas, of view blockage. Shielding the structure with 441 trees would only add to the
mass of the project. The City of Edmonds adopted the 30'height restriction many years ago to
insure that the magnificent vistas offered in the Citys natural bowl setting can be enjoyed by the
maximum number of its citizens. I feel these codes should be respected.
Secondly, I have concerns as to the quality of the work done by your consultants in preparing this
application. In the SEPA Check List, under Article 3. WATER, a. Surface (1); the wetland
whose "name unknown" is known the Edmonds/UNOCAL Afirsh and the consultants could have
most likely found this out by touring the interpretive trail located on the east side of the
r
The Edmonds/UNOCAL Marsh has been identified as a Category I wetland and designated as a
wildlife sanctuary. Extreme care should be exercised in any development plan by the Port. Wet-
lands enhancement was also cited as a goal in the Edmonds DownlownlWater ront Plan, 1995,
J
the formulation of which, the Port was a participant. I understand that through the restoration ef-
forts of the local Chapter of Trout Unlimited; an annual run of salmon has been re-established.
These efforts must be considered as well.
Thank you for considering my concerns.
Sincerely,
'e�u— �- J'��
Steplien E. Beck, r.
CC: Paul Mar, City of Edmonds
4 0
ac
-4. 1.-
X Z.
LLJ
cc
LU L)
-i
U 0
(n 0,
C/) LU
LU
LL
LU 0,
<
DI
5!
LLJ
Z
�- 0
Z I-
LU ui
0
LU Lul
X L)
1-- �-
LL 0
Z
ui U)
0
Z
0
ME
CITY OF EDMONDS. BARBARA FAHE I Y
MAYOR
505 BELL STREET - EDMONDS, WA 98020 - (206) 771-0247 FAX 1206) 771-0252
OFFICE OF THE MAYOR
��s t . 18 () %J
July 23, 1996
Louis and Dorothy Kribs
P.O. Box 246
Edmonds, WA 98020 0246
COP4.
RE: PORT OF EDMONDS PROPOSED BOAT STORAGE BUILDING
Dear Mr. and Mrs. Kribs:
I am writing you in response to your letter regarding height limitations in Edmonds and assume
you are referring to the boat storage building proposed by the Port of Edmonds. if not, I
apologize. Nevertheless, as the following would apply to any person desiring to build over the
current height limits, I would like to clarify the regulatory process in the Port project and the way
the City operates in its role as the review agency.
Anyone can make a request for a variance regarding restrictions currently in place in the City's
land development codes. There are clearly defined criteria that establish the basis on which a
variance can be granted. I have enclosed copies of the criteria for your reference. The Port, like
any other entity, can pursue this course of action.
I
The decision to grant a variance to City codes is made by the Heating Examiner based on meeting
the criteria. A public hearing is always held and citizens can give testimony as to why the criteria
have not been met or why the variance should not be granted.
Once the Hearing Examiner has made his decision, anyone who participated in the process�
including the applicant, can appeal the decision to the City Council. In this case, if the Examiner
denied the variance, the Port could appeal and would become the appellant. If the Examiner
granted the variance, anyone who was opposed and participated could appeal the decision.
During the course of the appeal, the City Council would hold a public hearing on the record
established by the Hearing Examiner. At the close of the heating the Council would issue a
decision on the appeal.
At this time, the Port has just submitted the environmental determination and permit application
documents, including variance requests. The first step in the process is for the City, as well as all
other affected agencies, to review this information and to communicate their concerns.
0 Incorporated August 11, 1890 9
Sister Cities International — Hekinan, Japan
t
r
Letter to Louis & Dorothy Kribs
August 6, 1996
Page 2
I would encourage you to contact the Port directly with'Your concerns. I can also assure you the
z
City will notify you when hearings related to this matter are scheduled. At this time, the City
3m:
I-
cannot express an opinion on the Port project as it might create conflicts during any appeal
Cr.
process.
01
01
th nth arifi
1 hope this gives you an understanding of esituation. Ifyouneedanyfi er cl cation,
LU
please feel free to contact me.
Ln U.
C>
Sincerely,
-J
LL <
W.
Barbara Fahey
Z �-i
Mayor
Z
L=U
BFIdm
(nil
0
CI
Enclosure
LU LU
X U
I-- —
c: City Council
U. 8!
.. Z11
-
Community Services Director
UJ
Planning Manager
0
z
WinWmW"%WbdBW9
0
W'.
77
�:0
Z
LU
U)
LLJ
LL.
LLJ
_j
U. <
D
LU
Z
�_ 0
Z �-
LU LU
0-
0 �_
LIJ Lu
LL 0
Z
LU (n
0
Z
to
51
city of edmonds
-development information
Variance
A variance is a method by which citizens are granted modifications from the strict
application of specific provisions of Chapters 16 and 17, and other sections where
specifically stated in the Community Development Code due to a hardship beyond the
control of the applicant. Variances do not permit property to be used in a manner
other than provided in the Community Development Code. This process is intended to
review situations where uniform zoning application would unduly burden one property
more than the other properties in the area.
Criteria
The Hearing Examiner has authority to grant a variance, where practical difficulties,
unnecessary hardship, or situations inconsistent with the general purpose of the
Community Development Code might result from the strict application of certain
provisions.
Variances may -be authorized when literal and strict interpretation would cause undue
or unnecessary hardship. A hardship is not a problem that you create yourself. For
instance, if you build your house in such a manner that you cannot expand the living
room without encroaching on a required side yard, you have created that situation.
Hardship speaks to whether you would be deprived of property rights common to the
general vjcinity and zone.
NO VARIANCE MAY BE APPROVED UNLESS ALL OF THE FOLLOWING FINDINGS CAN BE MADE:
1. Special Circumstances. That, because of special circumstances relating to the
property, the strict enforcement of the zoning ordinance would deprive the owner
of use rights and privileges permitted to other properties in the vicinity with
the same zoning.
Special circumstances include the size, shape, topography, location or
surroundings of the property, public necessity as to public structures and uses
and environmental factors such as vegetation, streams, ponds and wildlife
habitats.
Special circumstances should not be predicated upon any factor personal to the
owner such as age or disability, extra expense which may be necessary to comply
with the zoning ordinance, the ability to secure.a scenic view, the ability to
make more profitable use of the property, nor any factor resulting from the
action of the owner or any past owner of the same property.
2. Special Privilege. That the approval of the variance would not be a grant of
special pri'vilege to the property in comparison with the limitations upon other
properties in the vicinity with the same zoning.
3. Comprehensive Plan. That the approval of the variance will be consistent with
e ComprehensT—ve Plan.
M
Jv" ii�,.
<
Z-
UJ
Cc
LLJ
0
U) LU
UJ
-J
W LL
UJ 0�
U- <
BI
TOT
3:
Z �-
�- 0
Z �-
Lu W
(J)
0
lul
LL
Z
LU (n
0
Z
9"
Cli
4. Zoning Ordinance. That the approval of the variance will be consistent with
i—he purposes of the zoning ordinance and the zone district in which the property
is located.
S. Not Detrimental. That the variance as approved or conditionally approved will
not be significantly detrimental to the public health, safety and welfare or
injurious to the property or improvements in the vicinity and same zone.
6. Minimum Variance. That the approved variance is the minimum necessary to allow
the owner the rights enjoyed by other properties in the vicinity with the same
zoning.
Application Procedure
1. Prepare and submit an application for a variance. The Planning Division has
the forms and will assist you with * a�y —additional information needed. Your
application must include the following:
a. Completed application form.
b. The names and addresses of owners as shown on the records of the Snohomish
County Assessor and street addresses of property within 300 feet of any
point of the subject property.
C. Filing fee of $132.00 for applications in RS zone (single family
residential) or single family home wherever located; $264.00 for all others.
d. Depending on the nature of the variance requested, the Planning Division may
require additional information such as a site plan or building elevation.
2. Public Hearing. You will be assigned and notified of a hearing date as soon as
the hpplica is determined to be complete.
Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thursdays
of each month unless otherwise noted, in the *Plaza Meeting Room, Library
Building, 650 Main Street, Edmonds, and are open to the public. A maximum of
five applications are scheduled per meeting. You or your representative must -
appear at the hearing so the Hearing Examiner can ask questions concerning your
application. Should you or your representative be unable to attend the meeting,
?r if you wish to withdraw your application, please notify the Planning Division
in writing at least four days before the meeting.
3. Final Action. The Hearing Examiner issues a decision ten working days
following t nclusion of the hearing. This decision will be final unless a
written appeal is filed with the Planning Director within ten working days after
the decision is rendered. The appeal will be heard by the City Council.
4. Time Limit., The approved variance must be acted on by the owner within one
year from the date of approval or the variance will expire and be null and void,
unless the owner files an application for an extension of only one (1) year 30
days before the expiration date and the City approves the application.
5. Location. A variance applies only to the property for which it has been
approved and may not be transferred to any other property.
VARIANCE/BROCHURE
11192
V
I
0
I
1-: �,
APPLICANT DECLARATIONS
=Zl
�- LU
In order for the Hearing Examiner to approve a variance request, all of the
LU
following criteria must be met. It is the applicant's responsibility to show that
-J 0
0
all of the criteria are satisfied. Therefore, the following questions have been
LU,
LU
created to assist the applicant in providing applicable information.
LU 0
It is important to make your answers clear and direct. Yes/no type answers are
discouraged. Please answer all questions on a separate sheet.
LL <
Please type or clearly print your answers.
T)
:C UJ
z
�- 0
Z �-
LU UJ
1. How does the proposal meet the Special Circumstance Criteria? What
2 :D
:D a
special circumstances such as lot size, shape, topography, stream
U Cn
0—
location, wetland location, or other unusual problems are causing an
a LJ
LU LU
impact which would require a variance?
3: u�
�- F-
0
2. Explain why the proposal is not a Grant of Special Privilege. Is the
z
LU U)
proposal something that is allowed to other property owners in the
U T
�- �-J
vicinity, but would be disallowed on your property if the variance is
0
z
denied?
3. Explain how the proposal is consistent with the Comprehensive Plan.
(Ask a Planner for the Comprehensive Plan Designation for your
property.)
4. Explain how the proposal is congtant with the purposes of the Zoning
Ordinance and with the Zone district in which the property is located.
01
5. Explain how this proposal meets the criteria of Not Detriment"al. Will the
portion of your proposal for which you seek a variance cause a loss of
property value, scenic view, or use of surrounding properties? Will the
portion of the project for which you seek a variance be physically
injurious or harmful to any person on your property or surrounding
0
properties?
6. Explain how the proposed variance is the Minimum Variance needed to
accommodate the proposed project, or why there is no alternative other
than a variance in order to complete this project.
L.WRARYMARDECDOC
z
Z4
LU
Cr
LIJ
_J
(n UJI
U)
U3
LL
LIJ 01
2 �
C2 _J�
LL.
z
Z
LU Ui
g
cn�
0 P
a
LU
F_
U_ 0
z
LLI (J)
z
t 0
city of edmonds
development information zw'�w
Shoreline Management Permit
A Shoreline permit is required for any type of improvement on property
adjacent to or within 2001 of the shorelines of Puget Sound or Lake
Ballinger which exceeds $2,500 in fair market value for labor and
materials, or materially interferes with public access to publicly owned
shorelines. Single family dwellings are excluded from this requirement
unless they are speculative in nature. Site excavation for a single-family
resident which exceeds 250 cubic yards must obtain a Shoreline Substantial
Development permit. Shoreline permits are subject to review by the Hearing
Examiner and the State of Washington. The review process for a Shoreline
permit may take at least 6 months from the date of a complete application
until final approval by the state.
Criteria
Shoreline permit applications are subject to review under the criteria
contained in the City of Edmonds Shoreline Master Program.
Application Procedure
i. Prepare and submit an application for a shoreline permit. Your
,application must include the following:
a. Completed and signed application form.
b. Environmental Checklist.
c. Environmental Assessment.
d. Filing fee of $422.00'plus the actual cost of legal advertisements.
e. The names and addresses of owners as shown on the records of the
Snohomish County Assessor and street addresses of property within
300 feet of any point of the subject property.
f. Legal description of subject property.
h. Five copies of a vicinity map, no larger than 1111 x 1711,
indicating relationship of the site to adjacent lands and the uses
to which they are put for at least 400 feet in all directions from
the project site.
i. Five copies of a site plan no larger than 1111 x 1711, drawn to
scale, showing:
IL
L
0 '73
r--qm
10 IN,
LFA
U) —
U) UJ'
LU
to LL
LLJ 04
LL
SI
9) a
t4i
Z
�- 0
Z �-
0-
0 P1
LU U11
0
Z
UJ en
Z
t 0
(1) Site boundary and dimensions in vicinity of project.
(2) Land contours using 5-foot intervals or cross sections. if
project includes grading, filling, or other alteration of
contours, then either:
(i) Indicate existing and proposed contours and items (3)
through (8) below; OR
(ii) Provide two cross sections, one showing existing ground
elevations and height of structures, the second showing
proposed ground elevations and height of proposed
structures, with both showing (4) below.
(3) Size and location of existing improvements which will be
retained.
(4) Ordinary high water mark.
(5) Size and location of proposed structures.
(6) Maximum height of proposed structures above existing grade
level.
(7) Type and amount of proposed fill.
(8) Proposed utilities.
2. Hearing Examiner Review. You will be assigned and notified of a
hearing date as soon as the application is determined to be complete.
Hearing Examiner meetings are held at 9:00 a.m. on the first and third
Thursdays of each month, unless otherwise noted, in the Plaza Meeting
Room, Library Building, 650 Main Street, Edmonds, and are open to the
public. A maximum of five applications are scheduled per meeting.
You or your representative must appear at the hearing so the Hearing
Examiner can ask questions concerning your application. Should you or
your representative be unable to attend the meeting, or if you wish to
withdraw your application, please notify the Planning Division in
writing at least four days before the meeting.
The Hearing Examiner isues his decision ten working days following the
conclusion of the hearing. His decision will be final unless a
written appeal, stating reasons, is filed with the Planning Director
within ten working days after the date the decision is rendered.
Appeals will be heard by the City Council.
3. Filing With The State. The Community Development Director will file
copies of the following with the Department of Ecology and the
Attorney General within eight days of the final City action on a
shoreline permit: I
a. Decision. The final decision of the City on the permit, and the
permit if it was approved.
0
(n -1
rj) Uji
ul M:
-j �-!
0) LL.
ui
LL
a
UJ
z
LU LU
Ck
0-
a �-
LU LLI
0
z
ui
0
z
( G
U) U.
LIJ 0
U.
T) a
:c LLJ
�- 3:
z �-
�- 0
Z �-
LU uj
U
0—
C3 !:
LU LL
c
LU cl
L) 3
81-
z
no
Dear Barb:
Reference: Proposed change to allow the Port Of Edmonds to increase building height to
forty five feet for a boat storage building.
I am appalled the City of Edmonds may alter or abandon existing building height limitations
in order to accommodate the Edmonds Port District.
Having a storage building exceeding height limits and blocking views, just to
accommodate storage for pleasure boat owners is indeed an ill conceived idea. Since
when do the citizens of Edmonds have to suffer the loss of the panoramic view so unique
to this city to provide dead storage in the Port District7 Those of us who live within the
Port District are taxed to support the District Once a change Is made we will find a solid
wall of apartments and condominiums lining the waterfront area. Let the Port abide by the
rules as they now exist and reject their request. Raising the height to forty five feet would
be the forerunner to other changes in our City's Comprehensive Plan. Send the message
to the Port that they must abide by the existing regulations as everyone else is required to
do. They should be setting an example as good neighbors for all Edmonds citizens, not
advocates for a privileged few that want to store a boat.
Many of us are not in favor of altering or changing the height limitations for any reason. It
is requested that you as Mayor and members of the C4 Council hold fast to existing
regulations on the present height limitation.
ncerely,
Ji King,,,- 713 Laurel Street
Edmonds, WA 98020-4027
(206) 770 0856
-J. I.-
:c Z
F-
Q:
LM
-J
U 0
U) 0
Cn LU
Lu
-J
Cl) U.
LLI
LL
Cl)
LU
Z I--
0
Z I--
U.1 Lu
U (n
0-
0 �-
UJ Lu
C
Z
L Li Cr
0
Z
�*Z
to
CITY OF EDMONDS
CIVIC CENTER - EDMONDS, WA 98020 - f206) 771-0247 - FAX (206) 771-0252
OFFICE OF THE MAYOR
--ANN=-
9 0 . I o
July 23, 1996
Am King
713 Laurel Street
Edmonds, WA 98020 4027
RE: PORT OF EDMONDS PROPOSED BOAT STORAGE BUIELDMG
Dear Mr. King:
BARBARA FAHEY
MAYOR
I am writing you in response to your letter regarding the boat storage building proposed by the
Port of Edmonds. I feel there needs to be some clarification regarding the regulatory process and
the way the City operates in its role as the review agency.
Anyone can make a request for a variance regarding restrictions currently in place in the City's
land development codes. There are clearly defined criteria that establish the basis on which a
variance can be granted. I have enclosed copies of the criteria for your reference. The Port, like
any other entity, can pursue this course of action.
The decision to grant a variance to City codes is made by the Hearing Examiner based on meeting
the criteria. A public hearing is always held and citizens can give testimony as to why the criteria
have not been met or why the variance should not be granted.
Once the Hearing Examiner has made his decision, anyone who participated in the process,
including the applicant, can appeal the decision to the City Council. In this case, if the Examiner
denied the variance, the Port could appeal and would become the appellant. Fthe Examiner
granted the variance, anyone who was opposed and participated could appeal the decision.
During the course of the appeal, the City Council would hold a public hearing on the record
established by the Hearing Examiner. At the close of the hearing, the Council would issue a
decision on the appeal.
At this time, the Port has just submitted the environmental determination and permit application
documents, including variance requests. The first step in the process is for the City, as well as all
other affected agencies, to review this information and to communicate their concerns.
In reviewing your letter, I believe you do have some misinformation regarding this project. I
would encourage you to contact the Port directly with your concerns. I have forwarded your
letter to the Port.
* Incorporated August 11, 1890 0
Sister Cities International — Hekinan, Japan
M ia
Ete
city of edmonds
development information
MZ4
UJ
UO
W
a
Variance
Cn
CUM
LU,
�_
A variance is a method by which citizens are granted modifications from the strict
_j
U)U.1'
0:
application of specific provisions of Chapters 16 and 17, and other sections where
LU
specifically stated in the Community Development Code due to a hardship beyond the
control of the applicant. Variances do not permit property to be used in a manner
< d
other than provided in the Community Development Code. This process is intended to
L.L
MI
review situations where uniform zoning application would unduly burden one property
Ln
=Lu�
a I
more than the other properties in the area.
�-
3:
Z
�-
Criteria
�_
Z
0
I—
LULU
2
=
The Hearing Examiner has authority to grant a variance where practical difficulties,
unnecessary hardship, or situations inconsistent with the general purpose of the
,0
Community Development Code might result from the strict application of certain
0
provisions.
LU
=
Uj�
U;
Variances may -be authorized when literal and strict interpretation would cause undue
LL
0
Z
or unnecessary hardship. A hardship is not a problem that you create yourself. For
LU
U)
instance, if you build your house in such a manner that you cannot expand the living
Fc
room without encroaching on a required side yard, you have created that situation.
0
Hardship speaks to whether you would be deprived of property rights common to the
Z
general vicinity and zone.
NO VARIANCE MAY BE APPROVED UNLESS ALL OF THE FOLLOWING FINDINGS CAN BE MADE:
1. Special Circumstances. That, because of special circumstances relating to the
property, the striFt enforcement of the zoning ordinance would deprive the owner
of use rights and privileges permitted to other properties in the vicinity with
the same zoning.
41
Special circumstances include the size, shape, topography, location or
0
surroundings of the property, public necessity as to public structures and uses
and environmental factors such as vegetation, streams, ponds and wildlife
habitats.
Special circumstances should not be predicated upon any factor personal to the
owner such as age or disability, extra expense which may be necessary to comply
with the zoning ordinance, the ability to secure a scenic view, the ability to
0
make more profitable use of the property, nor any factor resulting from the
action of the owner or any past owner of the same property.
2. Special Privilege. That the approval of the variance would not be a grant of
special prif�viege to the property in comparison with the limitations upon other
properties in the vicinity with the same zoning.
3. Comprehensive Plan. That the approval of the variance will be consistent with
the Comprehi"n-sive Plan.
to
' '
`
' '
"^
ill with
Zoning ordinance.` ^hat~~ -the approval of -- variance�—-'be consistent
- , n property
the purposes ot the zoning ordinance and the zone district iwhich th�'
is located.
5.
' l
Not Detrimental. That the variance as approved or conditionally approved
not be significantly detrimental to the public health, safety and welfare or
injurious to the property or improvements in the vicinity and same zone.
6.
Minimum Variance. That the approved variance is the minimum necessary to allow
owner the rights enjoyed by other properties in the vicinity with the same
8pplication Procedure
1.
Prepare and submit an a plication for a variance. The Planning Division has
the forms and will assist you with. any additional information needed. Your
application must include the following:
a. Completed application form.
b. The names and addresses of owners as shown on the records of the Snohomish
County Assessor and street addresses of property within 300 feet of any
point of the subject property.
C. Filing fee of $132.00 for app lications in RS zone (single family
residential) or single family home wherever located; $264.00 for all others.
d. Depending on the nature of the variance requested, the Planning Division may
require additional information such as a site plan or building elevation.
2.
Public Hearing. You will be assigned and notified of a hearing date as soon as
the application is determined to be complete.
Hearing Examiner meetings are held at 9;00 a,m' on the first and third Thursdays
of each month unless otherwise noted, in the Plaza Meeting Room, Library
Building, GSO Main Street, Edmonds, and are open to the public. A maximum of
five applications are scheduled per meeting. You or your representative must
appear at the hearing so the Hearing Examiner can ash questions concerning your
application.Should you or your representative be unable to attend the meeting,
or if you wish to withdraw your application, please notify the Planning Division
in writing at least four days before the meeting.
3~
Final Action. The Hearing Examiner issues a decision ten working days
conclusion of the hearing' This decision will be final unless a
following�~'` ~-
written appeal is filed with the Planning Director within ten working days after
the decision is rendered. The appeal will be heard by the City Council.
4
'
The approved variance must be acted on by the owner within one
�~~,
be null and void"
d~of approval or the variance will expire and
^~~' ''~~ the �- 30
unless the owner files an application r for an extension of only one (1) year
days before the expiration date and the City approves the application.
5.
Location. A variance applies only to the property for which it has been
and may not be transferred to any other property.
VARIANCE/BROCHURE
11/92
0
VARIANCE
Z.J
< �)
APPLICANT DECLARATIONS
Z
LU
In order for the Hearing Examiner to approve a variance request, all of the
LU
following criteria must be met. It is the applicant's responsibility to show that
all ofthe criteria are satisfied. Therefore, the following questions have been
(D U uj.
created to assist the applicant in providing applicable information.
W
(n
0
It is important to make your answers clear and direct. Yes/no type answers are
W
discouraged. Please answer all questions on a separate sheet.
C?
U- <
Please type or clearly print your answers.
LU:
z I--
�- 0
Z 1--
1. How does the proposal meet the Special Circumstance Criteria? What
UJ LU
special circumstances such as lot size, shape, topography, stream
U cn,
0
location, wetland location, or other unusual problems are causing an
:-U
impact which would require a variance?
LU
2. Explain why the proposal is not a Grant of Special Privilege. Is the
Z::
a;
proposal something that is allowed to other property owners in the
vicinity, but would be disallowed on your property if the variance is
0
z
denied?
3. Explain how the proposal is consistent with the Comprehensive Plan.
(Ask a Planner for the Comprehensive Plan Designation for your
property.)
4. Explain how the proposal is congtant with the purposes of the Zoning
Ordinance and with the Zone district in which the property is located.
0
5. Explain how this proposal meets the criteria of Not Detrimental. Will the
portion of your proposal for which you seek a variance cause a loss of
property value, scenic view, or use of surrounding properties? Will the
portion of the project for which you seek a variance be physically
injurious or harmful to any person on your property or surrounding
properties?
6. Explain how the proposed variance is the Minimum Variance needed to
accommodate the proposed project, or why there is no alternative other
than a variance in order to complete this project
L-=M1A^VMDEC.D0C
1��, LJ
5".
0
_J
(n Lu�
W X:,
LU
_J
Ln UO-
Ln 01
LU:
Z
z
LIJ LU
cn,
W LU
LL 0
z
LU (n
0
z
ME
city of edmonds
development information
Shoreline Management Permit L
A Shoreline permit is required for any type of improvement on property
adjacent to or within 2001 of the shorelines of Puget Sound or Lake
Ballinger which exceeds $2,500 in fair market value for labor and
materials, or materially interferes with public access to publicly owned
shorelines. Single family dwellings are excluded from this requirement
unless they are speculative in nature. Site excavation for a single-family
resident which exceeds 250 cubic yards must obtain a Shoreline Substantial
Development permit. Shoreline permits are subject to review by the Hearing
Examiner and the State of Washington. The review process for a Shoreline
permit may take at least 6 months from the date of a complete application
until final approval by the state.
Criteria
Shoreline permit applications are subject to review under the criteria
contained in the City of Edmonds Shoreline Master Prog�am.
Application Procedure
1 1 Preeare and submit an application for a shoreline permit. Your
application must include the following:
a. Completed and signed application form.
b. Environmental Checklist.
c. Environmental Assessment.
d. Filing fee of $422.00 plus the actual cost of legal advertisements.
e. The names and addresses of owners as shown on the records of the
Snohomish County Assessor and street addresses of property within
300 feet of any point of the subject property.
f. Legal description of subject property.
h. Five copies of a vicinity map, no larger than 1111 x 1711,
indicating relationship of the site to adjacent lands and the uses
to which they are put for at least 400 feet in all directions from
the project site.
i. Five copies of a site plan no larger than 1111 x 1711, drawn to
scale, showing:
0
I--
Z
LU
0
a
U) LL
0
LLJ
cc
LL <I
U)
F-
Z
Z
UJ W,
L) cn
UJ W
F-
Li- 0
Z
LU (J)
U ZF
�7
0
Z
(a
(1) Site boundary and dimensions in vicinity of project.
(2) Land contours using 5-foot intervals or cross sections. if
project includes grading, filling, or other alteration of
contours, then either:
(i) Indicate existing and proposed contours and items (3)
through (8) below; OR
(ii) Provide two cross sections, one showing existing ground
elevations and height of structures, the second showing
proposed ground elevations and height of proposed
structures, with both showing (4) below.
(3) Size and location of existing improvements which will be
retained.
(4) Ordinary high water mark.
(5) Size and location of proposed structures.
(6) Maximum height of proposed structures above existing grade
level.
(7) Type and amount of proposed fill.
(8) Proposed utilities.
2. Hearing Examiner Review. you will be assigned and notified of a
hearing Ua-te as soon as the application is determined to be complete.
Hearing Examiner meetings are held at 9:00 a.m. on the first and third
Thursdays of each month, unless otherwise noted, in the Plaza Meeting
Room, Library Building, 650 Main Street, Edmonds, and are open to the
public. A maximum of five applicatio ' ns are scheduled per meeting.
You or your representative must appear at the hearing so the Hearing
Examiner can ask questions concerning your application. Should you or
your representative be unable to attend the meeting, or if you wish to
withdraw your application, please notify the Planning Division in
writing at least four days before the meeting.
The Hearing Examiner isues his decision ten working days following the
conclusion of the hearing. His decision will be final unless a
written appeal, stating reasons, is filed with the Planning Director
within ten working days after the date the decision is rendered.
Appeals will be heard by the City Council.
3. Filing With The State. The Community Development Director will file
copies of the foll?wing with the Department of Ecology and the
Attorney General within, eight days of the final City action on a
shoreline permit:
a. Decision. The final decision of the City on the permit, and the
permit if it was approved.
t
0
_J 6�
U) UJI
LU
—1
U) UL�
ZJ 0
LL
C)
LU
Z
0
LU LU
cl)
0-
0 �—
LU Ui
LL
Z
LU tn
0
Z
to
�V,
b. Application. The application form, site plan and vicinity map
c. Environmental Data. The environmental checklist, threshold
determination, and the declaration of nonsignificance or the
environmental impact statement. In lieu of this material, a
summarization of the actions and dates of actions on environmental
data may be filed.
d— Notice. The affidavits of notice.
4. Effective Date. No construction authorized by an approved shoreline
permit may begin until 30 days after Department of Ecology and
Attorney General have completed their review of the documents
specified in #3 above.
Note: This information should not be used as a substitute for City
codes and regulations. You should review all the details of your
project with the Planning Division at 250 Fifth Avenue North
(771-0220) between 9:00 a.m. and 5:00 p.m. Monday through Friday.
SHORLINE/BROCHURE
111-92
X
RECEIVED
To: Mr. Al Hooper, Executive Editor July 21,1996
The Edmonds Paper .11) L 2 2 1996
550 Main Street #B OFFICE OF THE MAyOR
Edmonds, Wa 98020
LUUJ
Dear Mr. Hooper,
LU
-j
U 0
cn 0,
The Edmonds Paper, dated June 26 to July 9, 1996 contained an article on
rn W:
Ui
page nine about the Port of Edmonds commissioners desire to exceed the height
-j
W LL
limitations by fifteen feet to construct a new boat storage facility.
Ui 0
g =i -
Two primary quotations in the article were by Port Director Bill Toskey " because
open space is in this by
LL <i
:)
sparse area, and we can use every inch" , and Port President
Dan Prinz "thinks
Ln Cc$
who it might be time for the Edmonds City Council to reevaluate the
X LU
�- :r,
existing policy governing height limitations."
Z
If we accept Bill Toskey's suggestion that space is tight, we should start erecting
Ui Uj,
five to ten story apartments, condominiums, office towers and the like. That would
solve his problem of using our space to the most effective use. Dan Prinz's comment
0
underlines the theory that if rules and regulations prohibit us from doing what we want,
a L—
LU Lu
then obviously we need to change them. The last thing we need is a boat storage
U
facility that flaunts and violates the building codes that make Edmonds an attractive
�L- 0:
place to live and do business in.
Z:
Lu rn,
Developers have invested millions in building facilities for condominiums and
0
Z
retail businesses, and have kept these structures within the city height limitations. It
would have been much more economical for them to build higher buildings on the
same real estate, but they honored the restrictions and resisted from clamoring for
deviations to the height regulations.
Property owners have also invested many millions, (collectively) in purchasing
properties such as homes, apartments and condominiums, in the Edmonds area on
the premise that existing height restrictions would be enforced, and with the
assurance that water front or territorial views would not be blocked by buildings
erected some day that were higher than the codes existing when they bought.
0
I strongly urge the Port Commissioners to rethink their current philosophy, and
build iomething within existing codes. I further urge the Mayor of Edmonds and the
City Council to put a stop to any violation of existing building codes, which when
enforced, protect the large investments made by developers and property owners.
t 0
Arthur H. Lowell
200 2nd. Ave. N. #302
774-7250
IWA
0
I F
=Z-
1-- UJ
cc 2
M
U
0
En (3
U) UJI
LU
U) LLI
01
LL <
Z
�i R
LU W
L) cn
0-1
0 1,-
L.0 LUI
LL 0
Z
ul (n
:F
0
Z
O'l
M
CITY OF EDMONDS BARBARA FAHEY
MAYOR
CIVIC CENTER - EDMONDS, WA 98020 - (206) 771-0247 FAX 1206) 771-0252
OFFICE OF THE MAYOR
9 0 9 q Q�
July 23, 1996
Arthur H. Lowell
200 2nd Avenue North #302
Edmonds, WA 98020
RE: PORT OF EDMONDS PROPOSED BOAT STORAGE BUILDING
Dear Mr. Lowell:
I am writing you in response to your letter to the Edmonds Paper regarding the boat storage
building proposed by the Port of Edmonds. I feet there needs to be some clarification regarding
the regulatory process and the way the City operates in its role as the review agency.
Anyone can make a request for a variance regarding restrictions currently in place in the City's
land development codes. There are clearly defined criteria that establish the basis on which a
variance can be granted. I have enclosed copies of the criteria for your reference. The Port, like
any other entity, can pursue this course of action.
The decision to grant a variance to City codes is made by the Hearing Examiner based on meeting
the criteria. A public hearing is always held and citizens can give testimony as to why the criteria
have not been met or why the variance should not be granted.
Once the Hearing Examiner has made his decision, anyone who participated in the process,
including the applicant, can appeal the decision to the City Council. In this case, if the Examiner
denied the variance, the Port could appeal and would become the appellant. If the Examiner
granted the variance, anyone who was opposed and participated could appeal the decision.
During the course of the appeal, the City Council would hold a public hearing on the record
established by the Hearing Examiner. At the close of the hearing, the Council would issue a
decision on the appeal.
At this time, the Port has just submitted the environmental determination and permit. application
documents, including variance requests. The first step in the process is for the City, as well as all
other affected agencies, to review this information and to communicate their concerns.
I would encourage you to contact the Port directly with your concerns. I have forwarded your
letter to the Port.
Incorporated August 11, 1890 0
Siste:Cities International — Hekinan, Japan
a
A
=Z-
�- UJ
cl: 2
0
U) a
L#) LU
LU
(1) LL
0
W
LL
Di
Ln a,
U,
Z
�- 0
Z �--
LU Uj
(J)
0-1
C3 �-
LU Lul
X U
�- r-
�L- 0
Z
Uj LI)
0
Z
10
ME
city of edmonds
development information
Variance
A variance is a method by which citizens are granted modifications from the strict
application of specific provisions of Chapters 16 and 17, and other sections where
specifically stated in the Community Development Code due to a hardship beyond the
control of the applicant. Variances do not permit property to be used in a manner
other than provided in the Community Development Code. This process is intended to
review situations where uniform zoning application would unduly burden one property
more than the other properties in the area.
Criteria
The Hearing Examiner has authority to grant a variance where practical difficulties,
unnecessary hardship, or situations inconsistent with the general purpose of the
Community Development Code might result from the strict application of certain
provisions.
Variances may 'be authorized when literal and strict interpretation would cause undue
or unnecessary hardship. A hardship is not a problem that you create yourself. For
instance, if you build your house in such a manner that you cannot expand the living
room without encroaching on a required side yard, you have created that situation.
Hardship speaks to whether you would be deprived of property rights common to the
general vicinity and zone.
NO VARIANCE MAY BE APPROVED UNLESS ALL OF THE FOLLOWING FINDINGS CAN BE MADE:
1. Special Circumstances. That, because of special circumstances relating to the
property, the strict enforcement of the zoning ordinance would deprive the owner
of use rights and privileges permitted to other properties in the vicinity with
the same zoning.
Special circumstances include the size, shape, topography, location or
surroundings of the property, public necessity as to public structures and uses
and environmental factors such as vegetation, streams, ponds. and wildlife
habitats.
Special circumstances should not be predicated upon any factor personal to the
owner such as age or disability, extra expense which may be necessary to comply
with the zoning ordinance, the ability to secure a scenic view, the ability to
make more profitable use of the property, nor any factor resulting from the
action of the owner or any past owner of the same property.
2. Special Privilege. That the approval of the variance would not be a grant of
special privilege to the property in comparison with the limitations upon other
properties in the vicinity with the same zoning.
3. Comprehensive Plan. That the approval of the variance will be consistent with
e Comprehensi've Plan.
.4.
X
�- LU,
cc
UJ L)
-J
0
(j) LU
Lu 3:
-J �-
LA.
0
LLI
2 �J
9 J!
LL <
31
0
X LLJ
�- 3:
Z F-
�- 0
Z F-
LIJ LU
M,
L)
0
a
LU Lul
3: L)
�- 1=
LL 0
Z
LU (n
0
Z
na
4. Zoning ordinance. That the approval of the variance will be consistent with
e purposes of the zoning ordinance and the zone district in which the property
is located.
5. Not Detrimental. That the variance as approved or conditionally approved will
not be signif cantly detrimental to the public health, safety and welfare or
injurious to the property or improvements in the vicinity and same zone.
6. Minimum Variance. That the approved variance is the minimum necessary to allow
the owner the rights enjoyed by other properties in the vicinity with the same
zoning.
Application Procedure
1. Prepare and submit an application for a variance. The Planning Division has
the forms and will assist you with any adVitional information needed. Your
application must include the following:
a. Completed application form.
b. The names and addresses of owners as shown on the records of the Snohomish
County Assessor and street addresses of property within 300 feet of any
point of the subject property.
C. Filing fee of $132.00 for applications in RS zone (single family
residential) or single family home wherever located; $264.00 for all others.
d. Depending on the nature of the variance requested, the Planning Division may
require additional information such as a site plan or building elevation.
2. Public Hearing. You will be assigned and notified of a hearing date as soon as
e applicatioF is determined to be complete.
Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thu*rsdays
of each month unless otherwise noted, in the Plaza Meeting Room, Library
Building, 650 Main Street, Edmonds, and are open to the public. A maximum of
five applications are scheduled per meeting. You or your representative must
appear at the hearing so the Hearing Examiner can ask questions concerning your
application. Should you or your representative be unable to attend the meeting,
?r if you wish to withdraw your application, please notify the Planning Division
in writing at least four days before the meeting.
3. Final Action. The - Hearing Examiner issues a decision ten working days
following -the conclusion of the hearing. This decision will be final unless a
written appeal is filed with the Planning Director within ten working days after
the decision is rendered. The appeal will be heard by the City Council.
4. Time Limit. The approved variance must be acted on by the owner within one
year from the date of approval or the variance will expire and be null and void,
unless the owner files an application for an extension of only one (1) year 30
days before the expiration date and the City approves the application.
5. Location. A variance applies only to the property for which it has been
appFo-ved and may not be transferred to any other property.
VARIANCE/BROCHURE
11/92
0
VARIANCE
zjt
<
APPLICANT DECLARATIONS
X z
LU
cc
In order for the Hearing Examiner to approve a variance request, all of the
J 0
following criteria must be met. It is the applicant's responsibility to show that
U a
all of the criteria are satisfied. Therefore, the following questions have been
U)
(n LU
Lu 3:
created to assist the applicant in providing applicable information.
-J �-,J
Ln to- 1,
w
It is important to make your answers clear and direct. Yes/no type answers are
Z. �:[
discouraged. Please answer all questions on a separate sheet.
g ti"
LL <�
(n BI
Please type or clearly print your answers.
LU
z
�- 0
Z �-
LU LU
1. How does the proposal meet the Special Circumstance Criteria? What
2 =),
special circumstances such as lot size, shape, topography, stream
0;:
location, wetland location, or other unusual problems are causing an
W
impact which would require a variance?
U- 0
2. Explain why the proposal is not a Grant of Special Privilege. Is the
z
w cn
proposal something that is allowed to other property owners in the
T
vicinity, but would be disallowed on your property if the variance is
01'
z
denied?
3. Explain how the proposal is consistent with the Comprehensive Plan.
(Ask a Planner for the Comprehensive Plan Designation for your
property.)
4. Explain how the proposal is congtant,�ith the purposes of the Zoning
Ordinance and with the Zone district in which the property is located.
0
5. Explain how this proposal meets the criteria of Not Detrimental. Will the
portion of your proposal for which you seek a variance cause a loss of
property value, scenic view, or use of surrounding properties? Will the
portion of the project for which you seek a variance be physically
injurious or harmful to any person on your property or surrounding
properties?
6. Explain how the proposed variance is the Minimurn Variance needed to
accommodate the proposed project, or why there is no alternative other
than a variance in order to complete this projea
LALIBRARYMARDECDOC
t
city of edmonds
development information
Shoreline Management Permit
A Shoreline permit is required for any type of improvement on property
adjacent to or within 2001 of the shorelines of Puget Sound or Lake
Ballinger which exceeds $2,500 in fair market value for labor and
materials, or materially interferes with public access to publicly owned
shorelines. Single family dwellings are excluded from this requirement
unless they are speculative in nature. Site excavation for a single-family
resident which exceeds 250 cubic yards must obtain a Shoreline Substantial
Development permit. Shoreline permits are subject to review by the Hearing
Examiner and the State of Washington. The review process for a Shoreline
permit may take at least 6 months from the date of -a complete application
until final approval by the state.
Criteria
Shoreline permit applications are subject to review..under the criteria
contained in the City of Edmonds Shoreline Master Program.
Application Procedure
Prepare and submit an application for a shoreline permit. Your
application must include the following:
a. Completed and signed application form.
b. Environmental Checklist.
c. Environmental Assessment.
d. Filing fee of $422.00 plus the actual cost of legal advertisements.
e. The names and addresses of owners as shown on the records of the
Snohomish County Assessor and street addresses of property within
300 feet of any point of the subject property.
f. Legal description of subject property.
h. Five copies of a vicinity map, no larger than ill, x 1711�
indicating relationship of the site to adjacent lands and the uses
to which they are put for at least 400 feet in all directions from
the project site.
i. Five copies of a site plan no larger than 1111 x 1711, drawn to
scale, showing:
0
W;12
0 a
Eta
(1) Site boundary and di amosivis in vicinity of project.
(2) L ol contours using 5-foot inter cro.stsbase.ctions. If
or ject includes grading, fillip Iteration of
contours, then either:
0) Indicate existing and proposed contours and items (3)
through (8) below; ON
""I de two cross sections, one showing existing ground
elevati'"' and height of ai�ructu—, th a second showing
pr ... sad Ground lay.t-os and height of proposed
structures, with both showing (4) below.
(3) Size and location of existing improvements which will be
retained.
(4) Ordinary high water mork.
(5) Size and location of proposed structures.
(6) M xi u height of proposed structures above existing grade
IM71
(7) Type and amount of proposed fill.
(8) Proposed utilities.
2. !!earing Examiner Review. You will be assigned and notified of a
hearing date as soon as the application is determined to be complete.
Hearing Examiner meetings are held at 9:00 a.m. on the first and third
Thursdays of each month, unless otherwise noted, in the PI — Matti ag,
Room, Library Building, 650 Main Street' Ed ... d" and are ,an to.the
publi c. A maximum of five appli cartions are scheduled per meeting,
You or ,or repr:.,e a , -- must appear at the hearing so the Maori ng
.amice, . ask t�t t .. carming
E an an ions your application. Should you or
your representative be unable to attend the meeting, or if you wish to
withdraw your application, please notify the Planni uO Division in
writing at least four days before the meeting.
The lalring E .. 1h,, isu.s his decision ten marking days fall owing the
_ailas, on of the eari a dec I be final unless a
a as an w!tI t p
pg. Hi isi
wri t�emtaapp ". at ting reasons, is f led wi In he lapping Director
within a working days after the date the decision is rendered.
Appeals will be heard by the City Council.
3. Filing WithhaThe State The Community Development Director will file
copies of i; f.11_ig; with th Department of Ecology and the
Attorney General within eight d: Y, of the final City action on a
shoreline permit:
a. Decision. The final decision of the City on the permit, and the
permit if it was approved.
0
b. Application. The application form, site plan and vicinity map.
- The environmental checklist, threshold
c. E viro men a
'the
t�-I,
deMorm7a. ion Gatd declarationj of nonsignificance or the
am nt-I i,p . lie. of thi:..�twri.l,
hgtacs�.Iemiept,
, p vJro
ammor a ' on f t t—s and dates of actions a nmental
data may be filed.
d
d. Notice. The affidavits of notice.
4. Effective Date. by an approved shoreli
uN' iconstructiln :utb'rized
�eratit nay begin at 1 30 days fter Department f E.-I gy and
,u
At are y G neral have completed their review ofo the docaments
spt.ci f7ed i pe#3
Note: This information should not be used as,: substit.ute for City
x
You sh h d tails of your
cod�s and a oul it rev w all t a
r
tgulatiGnS.
projec wi h the Planni ng Division at 250 Fifth Avenue North
t
(771-0220) between 9:00 a.m. and 5:00 p.m. Monday through Friday.
0
cj
SHORLINE/BROCHURE
11/92
on
0
Furthermore, if permits were issued for this project, we will
invariably have skyscrapers in downtown Edmonds. As property
owners, tax papers and voters we Just Say No to this and any other
endeavor that would mar the beauty of Edmonds.
r rs t
t
se
hn Lavalle'e
qJy L a a 1 Ide
z
C/3
U) LU:
La
-j
(1) LL
LU &
2 r-
C2
U-
D
uj
z
�— 0.
Z F-
LU Uj:
U U)i
0-
0—
LU LUI
�L- 0
z
LU cn
0
z
3a
�1-
Ln L'- I
wo
LL
Uj'
z
a
z
53 uj:
U)!
0;:
0 E
LU
3:
LL
U
0
z
to
"ARBLE
& GFLANITE
COMPANY
INC.
4
v
�129AIIZ- co —a,
L "ra m
. t� - T c IQ
qS/Tkv
CV 46
4tkL I
vvi
pal 0
L -6)
\M&VVVI, 1;�>tAl�
�7 �t
.. Acol
oL
v, Ph