Loading...
338 ADMIRAL WAY.pdf=Z- I— LU cc LU L) _j 0 W LLJ _j cn U_ 0 LU LL <i D) 3: Z I­ 0 Z LU LU LU Uj� LL. 0 Z LLI U) 0 Z M Z 0 �P O-R-T OF =6 ADRUZAL WAY August 6,196 EDMONDS.WASHVGTON98020-7214 Viss (206)774-0549 %rnss PAX (206) 774-7837 sv�',-- jAtA%I"k rj0IR co ;0� VI Burlington Northern Railroad Co. GATX Corporation c/o Registered Agent c/o Registered Agent C.T. Corp. Suste, C.T. Corp. System 520 Pike St 520 Pike St Seattle, WA 98101 Seattle, WA 98101 John Levin William Joplin Company Asst. General Counsel, GA7X Corp. 13406 19 V Ave SE 500 West Monroe Monroe, WA 98272 Chicago, IL 60661 Re: Notice of Environmental Contamination - Harbor Square Property Dear Registered Agent: The Port of Edmonds hereby provides notice of a release of hazardous substances on property owned by the Port of Edmonds, Washington. 7he Port previously notified the Washington Department of Ecology and Unocal Corporation, and we understand that Unocal provided noti . ce to GATX and Joplin. Each of you is receiving this letter because you may have potential liability associated with the property. The property is located in the 100 block of West Dayton Street in Edmonds, Washington. Harbor Square Associates leases the land from the Port and owns the buildings and other site improvements. 'Me Port purchased the property from Union Oil Company in 1978. The property. is located near the crossing of a Burlington Northern Railroad line. Union Oil had leased some or all of the property to Great Northern Railway in 1945. It reportedly was used by Great Northern Railroad and Burlington Northern Railway until 198 1. The Port understands from Unocal that a predecessor to GATX Corporation leased the property from Unocal to operate a railroad car tank cleaning and maintenance facility located on a railroad spur track on the property. GATX apparently constructed some buildings on the site and conducted its business utilizing the railroad spur. Unocal apparently entered into an agreement with GATX and Great Northern Railway, which approved of the GAIX operations. In 1950, the GATX operation was expanded, an additional railroad spur was constructed, and the agreement among Unocal, GATX and the Railway was amended. GATX apparently operated at the property until December 1963. Ile Port also understands from Unocal that Unocal entered into a lease in 1958 with Earl L Joplin, dtb/a Joplin Paving Company, for the operation of an asphalt hot -mix facility on property fronting on Dayton Street, to the east of the GATX operation. Joplin apparently continued operations on the property until 1968. The Port discovered a release of hazardous substances at the property on October 9, 1991, when a laboratory report containing the results of a limited soil sampling and testing program showed the presence of total petroleum hydrocarbons in excess of Model Toxics Control Act Method A cleanup standards. This release was reported to the Department of Ecology pn January 3, 1992. Results of an expanded program of Soil explorations and groundwater monitoring well installation and.sampling indicatedareas of.potentiia.coneem on -site. Ihe por A has -incurred approximately. $55,000 in costs on a, Sampling program, Phase I environmental assessment, other investigations at the site, and . legal fees. The Port anticipates incurring additional costs in the future related to the remediatioli of the site. Ile Port is not making a demand against you at this time, but is notifying you of the Contamination and the possibility that you may be potentially liable for costs incurred or to be incurred by the Port. The Washington 7 ' 7 (fu0mmunity services, 250 5' Ave N, Edmonds, WA 98020) Richard D. Tackett� Unocal (11720 Unoco Road, Building D, Edmonds, wA ggo2o) Cl) LL 0 LL T U! 3: z z LM Lli 0 LU 3: M� Mi AV ... . ........... .. cc U) U) W, Lu -i (1) LL LU It D cl z z LM LU U U)� 0;7 cl LU UJI LL 0 .. Zi LU U) 0 z to C: 7�- .. .. . ..... .. .. . . . . . . . . . ec . . . . . . . . . . -7 71 0 PORT' OF E 0 9 0 N D 5 63SAVAIMALWAY August 14, 1996 IMMONESMASMOTION98020-7214 (206)774-0549 Z PAX (206) 774-7837 LU, Cr 2: Mir. JeffTey S, Wilson < :)� LM C3, City of Edmonds 0i Community Services Department (n 250 5" Ave N LU 3: Edmonds, WA 99020 (f) LL 0 Dear Mr. Wilson: -J U- <1 This letter is in response to your letter of August 7.1996, subject "Comments on Environmental Detannination for the Proposed New Dry Stack Storage Facility and Marina Improvements". This T LU! letter is also a follow-up to a Icttrr submitted by Makers on behalf of the Port of Edmonds dated July Z 17,1996 which contained the Application for Shoreline Silbstantial Development rermit� SEpA �- 0; Z 1--: Checklist, legal descriptions, Adjacent Property Owners Checklist, Critical Areas Checklist, City of LU UX Edmonds Environmental Asiessment, Port of Edmon& Mitigated Determination of Nonsignificance, U (n, 11 and preliminary Architectural Design Board approval. 71tis letter is also a follow-up to our recent 0 — discussions related to the Port orEdmonds application for a height variance rela to a stack storage Ted a LU LU facility at the Port of Edmonds. IL 0� As you requested in your August 7 lefter, the Port of Edmonds is withdrawing its Environmental Z Determination as originally i33U*d on July 22,1996 fbrthc new dry stack storage facility. 77WP*rtof Edmonds will also prepare appropriate environmental documents related to the latest version of the 0 Port Master Plan, We are already committed to worldng with the City to ensure that the Fort's Master Plan is compatible with the City's Comprehensive Plan and that any areas of disagreement are amicably resolved. The Port is committed to developing a dry Mack storage project which is Uly consistent with the current City Comprehensive Plan and documentation related to this project wHI be presented to the City within the next two to six weeks. The Port will also resubmit its application for a dry suck storage project that addresses all of the concerns of the City staff as well as the applicable concerns of various citizens. We will specifically address Marina Beach parking, traffic impacts, overall Fort parking, and stream impacts. As agreed on August 14. 1996, the Port will provide draft copies of each application, permit analysis, 0 or other appropriate document to the City stafffor its consideration prior to official submittal, The Port is cornntitted to working cooperatively with all elements of the City staff on this and other significant Port projects. I request am the City staff contact me if thcy have any que3tioas or concerns related to any issues contained in this letter or in relation to other projects or Information contained within various Port plans or documents. 10 Sincerely, A ,V%krrdH Wi litw SKeoutive Dire 0 �q , -A 61:A 232703-1-045-0004 232703-1-057-0009 232703-4-003-0008 ESC Associates Burlington Northern Railroad Co. Harold R. Stone & L. Ardean 3131 E. Madison St, Suite 202 777 Main Street 14277 Worden Way Seattle, WA 98112 Fort Worth, TX 76102 Saratoga, CA 95070 2327034-011-0008 2327034-013-0006 Union Oil Company 2327034-012-0007 Margaret B. Vorwick Trust P.O. Box 7600 Port of Edmonds do Brice Inv. Realty Los Angeles, CA 90051 Edmonds, WA 98020 9450 SW Commerce Circle Wilsonville, OR 97070 2327q3-t-014-0005 Port o&Fdmonds 2327 -4-0,64-0004 0 onds 0� 23274.3-.4,-075-0001 Port SWdmonds Edn)dnNs, WA 98020 WA 99020 Edrdon&, WA 98020 2 2703*44-094-0008 3 2327,03-,04086-0008 ort Odmonds '1 0 f Ci of onds ivi e Civi enter 2327 3 1 -0005 rtK P 0 0 nds dru6nN WA 98020 So 25 i AvenueN. L E nds�WA $020 9 E 0 M oCnWA 98020 DV031-153-0006 mo C 4,lyd ads 25 Aven e N. 0 ut 23*34-158-0001 Po . NZIEdmonds r5Iq , 23270-\4-JA-0000 Portof Nonds E on WA 98020 - E�non WA 98020 Vs Edmolf, VA 98020 I , —, Jon l ee Nunn John Judy Lavallee Jim King 520 6th Ave. S. 7504A 210th St. SW 713 Laurel St. Edmonds, WA 98020 Edmonds,.WA 98026 Edmonds, WA 98020-4027 Arthur Lowell Bob VanCitters 200 2nd Ave. N. #302 Edmonds Marble-& Granite Co. Edmonds, WA 98020 15105 Highway 99 Lynnwood, WA 98037 232703-1-045-0004 232703-1-057-0009 2327034-003-0008 ESC Associates Burlington Northern Railroad Co. Harold R. Stone & L. Arden 3131 E. Madison St, Suite 202 777 Main Street 14277 Worden Way Seattle, WA 98112 Fort Worth, IX 76102 Saratoga, CA 95070 2327034-011-0008 2327034-013-0006 Union Oil Company 2327034-012-0007 Margaret B. Vorwick Trust P.O. Box 7600 Port of Edmonds c/o Brice Inv. Realty Los Angeles, CA 90051 Edmonds, WA 98020 9450 SW Commerce Circle Wilsonville, OR 97070 2327q3-t-014-0005 Port o dmonds 2327V-4:064-0004 Port: ofqdmonds 232703- ",75-0001 Port Oirdmonds Edn) n s, WA 98020 WA 98020 Edrdon&, WA 99020 2 2703-4-094-0008 23��3 of Ci of onds 2327 '3-000' �j86-0008 Port dXE onds Civi enter 'ivi P rtK 0 onds Edr y6nak, WA 98020 25 1 Avenue N. So - Al EL nds�WA 98020 , E 0 M onCWA 98020 23VO3-$-153-0006 C1 dmo 23XO,34158-0001 23270,"-0000 21504 Avenue N. P Edmonds Port o" FJjnonds E on , WA 98020 0 WA 98020 EdmT(as, NVA 98020 3nn1an td"nn Inhn A 3"d I numl Ian 14- V4- 520 6th Ave. S. 7504A 210th St. SW Px Edmonds, WA 98020 Edmonds, WA 98026 0 z Arthur Lowell Bob VanCitters 200 2nd Ave. N. #302 Edmonds Marble & Granite Co. Edmonds, WA 98020 15105 Highway 99 Lynnwood, WA 98037 0 Page 2 of 2 232703-1-045-0004 232703-1-057-0009 232703-4-003-0008 ESC Associates Burlington Northern Railroad Co. Harold R. Stone & L. Ardean 3131 E. Madison St, Suite 202 777 Main Street 14277 Worden Way Seattle, WA 98112 Fort Wort)4 TX 76102 Saratoga, CA 95070 Uj; 2327034-011-0008 232703-"13-0006 Union Oil Company 2327034-012-0007 Margaret B. Vorwick Trust 0! P.O. Box 7600 Port of Edmonds do Brice Inv. Realty LU; Los Angeles, CA 90051 Edmonds, WA 98020 9450 SW Commerce Circle Wilsonville, OR 97070 U. 0 2327Q34-014-0005 2327V-4-064-0004 23270,3-�,-075-0001 Port oVdmonds Port owmonds Port qWdmonds M Edrq�h�s, WA 98020 mpfidk, WA 98020 Edm-on&, WA 98020 ca) LUI 0' 2:�27�0�3t4-094-0008 2327,03-,0086-0008 monds f 2327 13-0005 ort Wdmonds oy r 0 tK LU Port onds 0 �( drp6nak, WA 98020 250 i Avenue N. Ed n nds, WA 98020 on WA 98020 ;7- LU 2��7034-153-0006 �j d'non 23XO,34158-0001 23270,,4�-0000 2 5 04 A v e ndusee N. PortEdmonds Port of onds z! E on WA 98020 e. ft T: E2ffion4s, WA 98020 EdmTfI , 1WA 98020 Jonl ee Nunn John Judy Lavallee Jim King 520 6th Ave. S. 7504A 210th St. SW 713 Laurel St. Edmonds, WA 98020 Edmonds,.WA 98026 Edmonds, WA 98020-40?7 Arthur Lowell Bob VanCitters 200 2nd Ave. N. #302 Edmonds MarbleI Granite Co. Edmonds, WA 98020 15105 Highway 99 Lynnwood, WA 98037 -iV �-i T k5 P 0 LU W U) LL 10 2 �: 9-1 U. Ln 0 U, z �_ 0 Z I­ LAJ LLI 0- U L 2 UJ (J 0 z t 0 1:= Isamonds, WA 98020-7214 SR-104 M.P.24.68 Vip. C.S.3130 Traffic Study Review For The Port of Edmonds South Harbor Master Plan Dear Mr. Toskey,- We have reviewed the traffic study you sent us for this proposed port expansion project. This expansion project will add 15 new PM peak hour trips and 125 new average weekday trips to the area's roadway system. To mitigate these traffic impacts we recommend the port agree -to participate in the funding of the City of Edmonds Multi - modal project. This project includes relocation of the ferry terminal and it's.traffic flow. Thank you for the opportunity to offer our comments on the' traffic study for this port expansion project. Should you have any questioins, please feel free to contact Don Hurter (440-4664) or Ed Giraud (440-491�) of my Developer Services section. * Si e' OB RT HSON, P. E. Manager o Planning L Loc 1 Co�� ti ocal Cog dination, RAJ:elg City of Edmonds 0 EEG I CITY OF EDMONDS BARBARA FAHEY 260 STH "ENUE NORTH . EDMONDS. WA 98020 - (206) 771-0220 0 FAX 1206) 771.0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works Planning Parks and Recreation Engineering Mailed 7/26/96 July 26, 1996 Sherman Goong Perteet Engineering, Inc. 2826 Colby Avenue, Suite 410 Everett, WA 98201 Subject: Traffic analy4is )r PbrtvffAMQnd1 Dear Sherman: I have received your analysis on trip generation for the Port of Edmonds dry stack and beyond., I reviewed your methodology, and it appears logical and comprehensive. As we discussed, however, I cannot make official comments on the analysis until there is an actual proposed development At this point the City has not received the necessary applications. I will place the study in a temporary file and do a thorough analysis at the time of SEPA review. Thank you. Sincerely, 31� Ir Gordon C Hyde Engineerin *9 Coordin2o/r WallWr GCH/sf PORTTFC.DOC 0 Incorporated August 11, 1890 & Sister Cities Internadonal — Hekinan, Japan 0 Project pbx�r s��t�oj.) r>--� Subject Catc. By Date Chkd By Date :r-"F- 40 A-1-s-r r Azo MM) &0 0 3-11 cc) 0 �S7 -2- -2- 4 PHASRS-) YCA-C. wer 4" i?o Act (2- PfaoZ^ev---r e-o rvx P LVn o PA 157 4-Tk=rr--- .. .......... --I L 2— A-Xcl-tclt-�'S- C> (t-rE-- -7%0 t- IA- Z 70 too P-m-rA.LL— Sp-p'e-c� 6-ce 2-- ay Pkcp-V_ . 115 ( t . Pmject Subject Calc. By < —Date Chkd By Date %ep-r, c:..s7 2-7-f. pAlaw- 3, 4VN$e R-AC-VMI> 86 Y 12- 1 -2. -s"e couiz-r Fov-- Pvr-r tmf=o werr A*7-4:;l S, C.0 0 Koo ea 0 NL%T--rR IsArs-ip-�- --Boo 0 -a, J�,o I t 4cp �-7ro.-J-MF- MA P zollol/-we Z�A(o o-k-w- PYA SOS-. vs--,o-tj, C/) rn 9 mr-� Uj z 0 !j �- LM Uj 0- n i,- LU LL. LU (1, 0 z KIM to Traffic Data Gathering Location: Entran ce to Marin Beach Park 114110 - 13th Street SI.E.: Site: 95-165-01 Weather Rainy, Lake Stevens. WA 98258 Date: 09128/95 Counter 14 File: [none] Interval S8 N8 COMBINED Day Thursday Begin AM PM PM- AM, 12:00 0 0 13 0 0 3 12 01 0 4 25 MIS 0, 2 4 12:30 0 51 0 4 9 12:45 0 5 0 3 0 8 1:00 0 '0 6 30 0 0 8 32 , 0 0, 14 62 1:15 0 6 0 4 0 10 1:30 0 8 0 8 0� 16 1:4S 2:00 0 0 10 0 12, 0 :22 0 10 33 0 0 10 33 0 0 20 66 0 6 - 0 3 0 9 2:30 0 8 0 10 0 2:45 a 9 0 io 0 19 3:00 0 , 0 9 25 0 0 11 31 0 0 20 56 3:15 0 7 0 91 0 i6 3:30 0 7 0 7 0 14 3.4S 0 2 0 4 '0. 6 4:00 0 0 4 18 0 0 8 24 0 0 12, 42 4:15 0 - 6 0 10 0 16 4:30 0 6 0 6 0 12 4:45 0 2 0 0 0 2 5:00 a 0 4, 15, 0 0 4 19 0 '0 '8 34 5:15 0 6 0 6 0 12 5:30 0 1 0 5 0 6: SA 0 4 0 4 0 8 6:00 a 4 17 0 0 3 11 0 0 7 28 6:15 0 2 '1 3'. 6:30 0 6 0 3 0 9 6:45 5 0 4 0 7:OD 8 . 6 18 —0 5-'. 8 30 1 13 :9 14 48 7:15 0 2 11 2 16 7:30 2' 3 2 4 7:45 5 6 8 8 14 8:00 18 0 41 9 18 2 8 11, 36 2 12 8:15 6 8 2 8:30 4 2 9, 2 13 .4 8:45 2 '0 1 2 .3 4 4 9:00 6 8 1 11 6 14 2� 9:15 3 2 .6 1 1 3, 9:30 1 3 1 4 2 7 9:45 2 5 0 5 2 10 10:00 7 is :0 0 3 is 0 10, 30 0 o 10:15 3 0 0 8, 0­ 10:30 4 4 0 8 0 10:45 1 0 3 0 4 11:00 2 �9 4 4 1 7 3 3 , 3 W :,7: 7 11:15 2 0 3 o 5 0 11-30 1 0 1 2� OL 11:45 4 0 2 .6 0 Totals 56 188 53 109 �402 Split x 51.4 46.81 48.6 53.2 Day Totals �244 267 Day Splits 47.7 52.3 Peakliour 7:45 1:16 7:45 2:30 7:45 ':2:30 Vol we 21 34 40 AD 7 3 Factor 0.88 0.86 0.53 0'.91 '0 77, 0.91 JANUS Raw Data File: Page 2 9516502 Printed: 09-30-1995 Traffic Data Gathering Location: Admiral Way Anthony Edmonds 11410 - 13th Street S.E. Site: 95-165-01 Weather Rainy Lake Stevens. WA 98258 Date: 09/28/95 Counter 16 File: [none3 Interval SB NB COMBINED Day Thursday Begin AM PM AM PM Pm z < 12:00 1 4, 11 48 1 2 8 41 2 6 19 89 mr 12:16 a 1 8 0 12 20 12:30 1 16 - 0 14 30 cc 12:45 2 13 1 7 3 20 ;5 1:00 0 5 14 59 1 3' 16 61 8 30 120 d 0� 1:15 3 13 0 - 11 3 24 - ft 1:30 1 14 1 16 2 30 1:45 1 18 1 18 2 36 U5 mi I'E! 2:00 0 2 22 74 0 4 18 66, 0 6 40 140 (n LOL 2:15 2 14 2 12 4 26 Uj 2:30 0 20 0 18 0 38 2:45 0 18 2 18 2 36 3:00 1 4 14 67 0 12 56 1 26 123 LL < 3:15 is 1 is 1 33 Ln 8 3:30 2 22 14 - 36 :r LU 3:45 1 13 is 2 28 1-- 3:1 4:00 0 3 so 0 1 17 67 0 4 31 107 Z 4:15 0 17 0 17 0 34 4:30 2 10 0 14 2 24 Z 4:45 1 9 2 18 LU uj mi 6:00 1 14 11 38 1 8 13 39 2 22 24 77 Q! 5: 15 2 10 2 10 4 20 Cni 0 5:30 5:45 7 4 7 1 12 8 10 19 0 4 4 8 14 LU LU 6:00 6 .15 17 75 2 7 9 31 8 -22 26 106 x L) 6:15 - 2 22 0 2 2 24 6:30 5 23 1 9 6 32 z 1 6:45 7:00 2 13 4 11 24 6i 3 19, 32 64 2 7 11 61 5 26 43 115 7:15 1 7 2 22 3 29 7:30 6 6 0 7 6 13 0 z 7:45 9 9 3 21 12 30 8:00 12 39 5 18 12 32 16 47 24 71 21 65 8:15 10 3 4 9 14 12 8:30 10 6 10 10 20 16 8:45 7 4 6 12 13 16 9:00 6 44 8 24 16 73 10 29 11 29 19 53 9:15 16 4 7 4 23 8 9:30 12 5 7 3 19 8 9:45 10 7 5 11 18 10:00 15 44 1 14 8 40 3 16 23 B4 4 30. 10:15 14 3 '12 7 10 10:30 10 4 id 1 2 20 �6 10:45 5 6 10 4 15 10 11:00 12 47 2 5 16 41 2 5 28 10 11:15 10 2 10 3 20 5 11:30 9 1 6 0 11:45 16 0 9 0 25 0 Totals 240 526 176 509 414 Split x 58.0 50.8 42.5 49.2 Day Totals 685 - e :1.451 Day Splits 52.8 47.2 Peak Hour 9:15 6:15 10:15 1:45 1:46 Volum 53 90 48 66 89 140 Factor 0.83 0.70 0.75 0.92 0.79 6.88 JANUS Raw Data File: 9516601 Printed: 09-30-199S Page 2' -AC: 7 M. ''I'll R111, %,'j I," ELM- U) U. w 0 U. wo UJ z I-- ;7- 0 Z �- W LU 0- 0!:: W LL w fj z 0 S12eed Report, Admiral Wav 0 Arnials, Edmonds, paae 4 Da-lv Control ession summ;4?-v Av4�ge Speed of All Vehicles ... 19.84 Med3.aa--S2eed .................... 19.71 MPH Mode Spee . ................... 17.50 15th Percentile eed ........... 15.42 H 85th Percentile Sp ........... 2 . 2 MPH 10 MPH Pace ........... ..... 15-25 (77.68!k) Vehicles Exceeding 55 m ...... None Vehicles Exceedin PH None Vehicles Excee g 65 MPH '--�-None kun eeak .................... 1�-7'06—to 12:00 (136 vehicles) AM Hour Factor ............. 79. 151; ?W'Peak Hour .... 17:00 to 8. 0 1�,�168 vehicles) PM Peak Hour Factor ............. 93.34; Thursday 09/28/95 Channel: I Direction. S 0- 10-14 -19 15 20 -24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 6 G+ Total 00:15 0 0 1 0 0 0 0 0 0 0 -0 0 1 00:30 a 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 2 0 0 0 0 0 0 a 0 2 Hourly Totals 0 0- 1 2 0 0 0 0 0 0 0 0 3 01:15 0 0 0 1 0 0 0 0 0 0 0 0 1 01:30 1 0 2 0 0 0 0 0 0 0 0 0 3 01:45 0 1 0 0 0 0 0 0 0 0 0 0 1 02:00 0 0 0 0 0 0 0 0 a 0 0 0 0 Hourly Totals 1 1 2 1 0 0 0 0 0 0 0 —0 5 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 0 a' 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 a 03:00 0 0 0 0 0 0 a 0 0 0 0 0 0 Hourly Totals 0 1 0 0 0 0 0 0 0 0 0 0 1 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 03:45 1 0 1 0 0 0 0 0 0 0 0 0 2 .04:00 0 0 0 0 0 0 0 0 0 0 0 Hourly Totals 1 0 1 .0 0 0 0 0 0 0 0 0 2 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 1 0 0 0 a 0 0 0 0 0 0 1 Hourly Totals 0 1 0 0 0 0 0 0 0 0 0 0 1 05:1S 0 1 1 1 0 0 0 0 0 0 0 0 3 05:30 0 0 2 5 1 1 0 0, 0 0 0 0 9 05:45 0 1 2 2 2 0 0 0 0 0 0 7 06:00 0 2 5 1 1 0 0 0 0 0 b 0 9 Hourly Totals 0 4 10 9 4 1 0 0 0 0 0 0 28 LL (j) D a LU! Z I.- z Ui LU 0 Ui Lul �L- 0 z ui (1) 0 z PC Speed R 'Admiral Way @ Arni s, Eftonds, page Thursday 09/28/95 Channel: 1 Direction: S --0- 9 10-14 15-19 20-24 25-29 30-34 35-39 40-" 45-4 50-54 55-59 60+ Totals 06:15 0 1 6 5 1 0 a 0 0 0 0 0 13 06:30 0 0 2 2 2 0 0 0 0 0 0 0 6 06:45 0, 0 4 2 3 0 0 0 0 0 0 0 9 07:00 0 1 2 i 2 0 0 0 0 0 0 0 6 Hourly Totals 0 2 14 10 8 0 0 0 0 0 0 0 34 07:15 0 1 3 3 0 0 0 0 0 0 0 7 07:30 0 2 5 1 1 0 0 0 0 0 0 0 9 07:45 0 0 1 3 0 0 0 0 0 0 0 4 08:00 0 3 9 0 0 0 0 0 0 0 12 Hourly Totals 0 3 12 16 0 0 0 0 0 0 0 32 08:15 0 1 5 4 4 0 0 0 0 0, 0 0 14 08:30 0 1 5 3 3 0 0 0 0 0 0 0 12 08:45 0 1 4 2 1 0 0 0 0 0 0 0 a 109:00 0 1 3 6 0 0 0 0' 0 0 0 0 10 Hourly Totals 0 4 17 15 8 0 0 0 0 0 -- 0 0 44 09:15 0 1 6 5 1 0 0 0 0 0 0 0 13 09:30 0 2 7 a 2 1 0 0 0 0 0 0 20 09:45 1 9 7 2 0 0 0 0 0 0 0 19 10:00 0 3 5 2 0 0 0 0 0 Z 0 17 Hourly Totals 0 7 29 25 7 1 0 0 0 0 — 0 0 69 10:15 0 3 8 9 5 0 0 0 0 0 0 0 25 10;30 0 4 9 6 2 0 0 0 0 0 0 0 21 10:45 0 0 10 7 1 0 0 0 0 0 0 Is 11:00 0 4 1 6 0 0 0 0 0 0 0 30 Hourly Totals 0 11 46 28 1 0 0 0 10 0 94 1105 0 6 10 4 2 0 0 0 0 a 0 0 22 11:30 1 a 9 10 5 0 0 0 0, 0 0 25 11:45 1 7 16 5 3 0 0 0 0 0 0 a 32 12:00 1 11 9 2 0 0 0 0 0 0 0 42 Hourly Totals 3 24 54 28 12 0 0 a 0 0 0 0 121 12:15 1 9 17 3 1 0 0 0 0 0 0 0 31 12:30 0 5 12 14 0 1 0 0 0 0 0 0 32 12:4S 0 1 13 22 6 0 0 0 0 0 0 0 42 13:00 1 0 13 5 5 0 0 o 0 0 0 0 24 Hourly Totals 2 Is 55 44 12 1 0 0 0 0 0 0 129 1305 0 3 9 8 0 2 0 0 0 0 0 0 22 13:30 0 5 12 11 4 0 0 a 0 0 0 0 32 13:45 0 4 9 5 2 0 0 0 0 0 0 0 20 14:00 1 3 13 13 2 1 0 0 0 0 0 a 33 Hourly Totals 1 Is 43 37 3 0 0 0. 0 0 0 107 1405 0 9 10 9 4 1 0 0 0 0 0 33 14:30 1 3 14 12 1 0 0 0 0 0 _0 0 31 14:45 0 2 12 7 7 1 0 0 0 0 0 0 29 15:00 0 2 14 11 4 0 0 0 a 32 Hourly totals 1 16 50 39 16 3 0 0 0 0 0 0 125 " F, % Speed Report, "Admiral WaY 0 Axnie"s, Edmonds,' P-acre Thursday 09/28/95 Channel: I Direction: S 0- 9 10-14 15-19 20-24 25-29 30-34 35-39 40-" 45-49 50-54 55-59 6G+ Totals 15:15 0 7 15 14 2 0 0 0 0 0 0 0 38 15:30 0 0 a 10 5 0 a 0 0 0 0 0 23 z 15:45 0 4 9 19 2 0 a 0 0 0 0 a 34 16:00 —S 2 9 6 0 0 0 0 0 0 0 24 3: Uji Hourly Totals 0 13 39 52 15 0 0 0 0 0 0 0 119 U: IU 16:15 0 2 11 8 2 1 0 0 0 0 0 0 24 0! 16:30 0 1 10 13 4 0 0 0 0 a 0 0 28 Cn 16:45 1 4 9 7 4 1 0 0 a 0 0 26 En LUU1 X!, 17.00 1 4 9 12 7 a 0 0 0 0 a 0 33 Hourly Totals. 2 11 39 40 17 2 0 0 0 0 0 ill 17:15 0 is 12 5 0 -0 0 0 0 0 0 40 17:30 1 5 17 9 0 0 0 0 0 0 36 L.L M 17:45 0 1 14 12 7 1 a 0 0 0 0 a 35 T Luil 18:00 5 17 13 4 - 0 a 0 0 0 0 0 .39 X, Hourly Totals 1 19 63 46 20 1 0 0 0 0 0 150 ;7- g 18:15 0 a 18 12 0 a 0 0 0 0 0 38 Z LU wi 18:30 1 6 20 10 2 0 0 0 0 0 0 0 SOO' -1 0; 18:45 0 5 17 15 6 0 0 0 a 0 0 0 43 (ni 19:00 1 14 19 4 1 1 0 0 0 0 0 0 40 0 ;- Hourly Totals 2 33 74 41 9 1 0 0 a 0 0 0 160 LU W 19.15 0 3 23 16 6 0 0 0 0 0 0 0 4.8 u- a 19:30 0 1 7 7 4 0 0 a 0 0 0 0 19 Z. 19:45 0 3 14 5 1 0 0 0 0 0 a 23 L3 e M, 20:00 1 2 10 11 1 0 0 0 0 0 0 25 Hourly Totals 1 9 54 39 12 0 0 0 0 0 1 0 0 115 z 20:15 0 0 4 7 0 0 0 0 0 0 0 0 11 20:30 1 1 9 5 4 0 0 0 0 0 0 0 20 20:45 1 2 7 1 3 0 0 0 0 0 0 '0 14 21:00 0 4 3 4 2 0 0 0 0 13 Hourly Totals 2 7 23 17 9 0 0 0 0 0 58 21:15 0 1 3 0 0 0 0 0 0 6 21:30 0 1 1 2 4 0 0 0 0 0 0 0 8 21:45 0 0 1 3 2 1 0 0 0 0 0 7 22:00 0 1 2 1 1 0 0 0 0 a 0 0 5 Hourly Totals 0 3 7 7 1 0 .0 0 0 0 0 '26 22.15 0 1 3 1 1 0 0 0 0 0 0 0 6 22:30 1 0 1 1 1 0 0 0 0 0 0 0 4 22:45 0 0 5 5 0 0 0 0 0 0 0 0 '10 23:00 2 2 0 0 0 0 0 0 0 0 0 4 Hourly Totals 1 3 11 7 2 0 0 0 0 0 0 0 24 23:15 0 0 2 2 0 0 0 0 0 0 a 0 4 23:30 0 4 1 0 1 0 0 0 0. 0 6 23:45 0 1 0 0 0 0 0 0 0 0 0 0 1 00:00 0 0 0 0 0 0 0 0 0 0 0 0 0, Hourly Totals 0 1 6 3 0 1 0 0 0' 0 0 0 11 Daily Totals IS 203 650 506 176 16 0 0 0 0 0 0 1569 Percentage 1.1% 12.9% 41.4% 32.2% 11.2% 1.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% U) LL Uj 0 LL. < D 0 z LU LLI 0- a t UJ LL IL �L- C 2 LU U 0 z vtz .. ..... ... it i� V fteed Report, 'Acl-jral Way 0 Arn iels, Edmonds' 2-age 7 Daily Control session summary Average Speed of All Vehicles ... 19.63 Median speed .................... 19.33 MPH Mode Speed ...................... 17.50 15th Percentile Speed ........... Is.11 MPH 85th Percentile Speed ........... 24.57 MPH 10 MPH Pace ...................... 15-25 (73.68!k) Vehicles Exceeding s5 MPH ....... None Vehicles Exceeding 6o MPH ....... None Vehicles Exceeding 65 MPH ....... None AM Peak Hour .................... 11:00 to 12:00'(i2l vehicles) - AM Peak Hour Factor ............. 72.0!k PM Peak Hour ......... 18:15 to 19:15 (170 vehicles) PM Peak Hour Factor .... 88.5!k 4-Hour Moving Totgl 01:00- 1457 02:00- 1459 03:00- 1456 04:00- 1456 05:00- 1457 06:00- 1446 07:00- 1436 08:00- 1420 09:00- 1391 10:00- 1378 11:00- 1400 12:00- 1385 13:00- 1363 14:00- 1376 15:00- 1422 16:00- 1463 17:00- 1452 18:00- 1434 19:00- 1509 20:00- 1537 21:00- 1556 22:00- 1S56 23:60- '1567 24:00- 1569 v": M Speed Report,-- 'Admigal Way 0 Arniefs, EdmondW P-a-cfe 4 t 1 S--- Average s of All Vehicles Median Spee . ............ 95 MPH Mode Speed ..... ..... 22.50 z 15th Percentile S .. ......... 16.61 MPH ME zk- UJI 85th Percentile Spee ......... 27.11 MPH cc 10 MPH Pace ..... ..... ..... 15-25 (70.02!k) LU Vehicles Excee i g 55 MPH 1 0.08%-) _j U 01 Vehicles Exc ing 60 MPH 0 .08% c3i LO UJ j w X; vehicles eeding 65 MPH ... AM Peak our ............ . 5 ...... :15 (73.vehicles) AM P Hour Factor 83. Cn LL 0 ......... eak Hour .................... 12:45 t"b-, :45 (114 vehicles) PM Peak Hour Factor ............. 86.4* U. D Thursday 09/28/95 Cha=el:' I Direction: N S2 CI UJ 0- 9 10-14 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 --60+ Totals 00:15 0 1 1 2 3 0 0 0 0 0 0 0 7 z 00:30 0 1 0 0 0 0 0 0 0 0 0 0 1 0! Z 00:45 0 0, 0 0 0 0 0 0 0 D 0 0 0 Lu UJI 01.00 0 0 1 0 0 a 0 0 0 0 0 2 m! Hourly Total's 2 1 3 3 0 1 - 0 0 0 0 0 0 10 00 !L-= 01:15 0 0 1 2 0 0 0 0 0 0 0 0 3 LU UA 01:30 0 0 1 0 0 0 0 0 0 0 0 0 1 X 01:45 0 0 1 0 1 0 a 0 0 0 0 0 2 U. 02:00 1 0 1 1 0 0 0 a 0 0 0 Hourly Totals 1 0 0 3 4 3 0 0 0 0 01 0 0 9 U 02:15 0 1 0 0 0 0 0 0 01 0 0 0 1 z 02:30 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 a 03.00 0 0 0 0 0 0 0 0 0 0 0 Hourly Totals 0 1 0 a 0 0 0 0, 0 0 0 1 0:15 1 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 a 0 1 0 0 0 0 0 1 04:00 0 0 a 0 0 0 0 0 0 0 0 A Hourly Totals 1 0 0 0 1 0 0 0 0 0 0 0 2 0 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 a 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 a 0* 0 0 0 0 0 .0 0 0 05:00 0 0 0 0 0 OL 0 0 a Hourly Totals 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 1 0 0 0 0 0 0 0 0 0 05:30 0 0 1 1 0 0 1 1 0 0 0 OL 0 05:45 0 1 0 2 0 0 0 0 0 0 0 0 -3 3 06:00 0 1 1 0 1 0 0. 0 0 Hourly Totals 0 3 1 3 1 2 0 a 0 0 0 0 10 fn U- 0 LLI LL < LU! z �- z W LU� D Cd LU U1 Z! U) T 0 z to "a Speed Report, 'Admiral Way 0 Arnie's, Edmonds' ipage S Thursday 09/28/9S, Channel: 1 Direction: N 0- 9 10-14 15-1 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60+ Totals 06:15 0 0 0 2 1 0 0 0 0 0 0 0 3 06:30 0 0 1 0 0 0 0 0 0 0 0 0 1 06:45 0 0 0 0 1 0 0 0 0 0 0 1 07:00 0 0 2 0 1 0 0 .0 0 0 0 0 a 3 Mourly Totats 0 0 3 2 3 0 0 0 0 0 0 8 07:15 0 1 2 0 2 0 0 0 0 0 0 0 5 07:30 0 1 0 0 0 0 0 0 0 0 0 0 1 07.45 0 0 3 1 1 0 0 0 0 0 0 0 5 08:00 0 0 0 0 2 0 0 0 0 0 0 2 HourLy Totats 0 2' 5 1 5 0 0 0 0 0 0 0 13 08:15 0 0 3 5 3 0 0 0 0 0 a 0 11 08:30 0 0 2 5 0 0 0 0 0 0 0 0 7 08:45 0 a 1 1 2 0 0 0 0 0 0 0 4 09:00 0 1 6 2 2 0 0 0 0 0 0 0 11 Hourty Totats a 1 12 13 7 0 0 0 0 0 0 0 33 09:15 0 0 1 2 3 1 0 0 0 0 0 0 7 09:30 0 2 3 2 0 0 0 0 0 0 0 is 09:45 a 0 2 3 3 0 0 0 0 0 0 0 8 10:00 0 0 1 5 5 0 0 0 0 0 0 0 11 HourLy Totats 0 2 7 18 13 1 0 0 0 0 0 0 41 10:15 0 2 4 5 6 0 0 0 0 0 0 0 17 10:30 0 0 0 6 2 0 0 0 0 a 0 0 8 10:45 0 0 , 6 13 1 0 0 0 0 0 a 0 20 11:00 0 a 2 3 4 0 0 0 0 0 0 9 Hourty Totats 0 2 12 27 13 0 0 0 0 0 0 0 54 11:15 0 2 5 4 3 0 0 0 0 0 0 0 14 11:30 0 5 1 4 3 2 0 0 0 0 0 0 15 11:45 0 0 1 7 3 1 0 0 0 0 0 0 12 12:00 0 2 2 6 2 1 0 0 0 0 0 0 13 flourty Totats 0 9 9 21 11 4 0 0 0 0 0 0 54 12:15 0 1 4 10 2 1 0 0 0 0 0 0 18 12:30 0 2 4 6 4 0 0 0 0 0 0 0 16 12:45 0 a 4 13 4 0' 0 0 0 0 0 0 21 13:00 0 2 6 13 4 0 0 o 0 a 0 1 0 25 Hourty Totats 0 5 is 42 14 1 0 0 0 0 0 0 80 13:15 0 1 5 5 12 0 0 0 a 0 0 0 23 13:30 0 2 3 12 7 1 0 0 0 0 0 0 25 13:45 0 2 7 is a 1 0 0 0 0 0 0 36 14:00 0 2 8 - 12 2 0 0 0 0 0 0 0 24 Hourty Totats 0 7 23 47 29 2 0 0 0 0 0 0 108 14:15 0 2 5 14 3 3 0 0 0 0 0 0 27 14:30 0 3 9 9 3 0 0 0 0 0 0 0 24 14:45 1 1 11 13 a 0 0 0 0 0 0 34 15:00 2 3 16 10 1 0 0 0 0 0 0 39 Hourty 7`6tals 3 9 41 21 4 0 0 0 0 0 0 124 n '5 , 0. 07 Speed Re ort ral wa%r a Edmonds,, pacre 6 Thursday 09/28/95. Channel: 1 Direction:.N 0- 9 10-14 15-19 -20-24 25-29 30-34 35-3 40-" 45-49 50-54 5s.59 60+ Totats 15:15 0 2 11 is 3 1 0 0 0 0 0 0 35 .15:30 0 0 3 10 7 0 0 0 0 0 0 21 z 15.45 1 3 16 13 4 o 0 0 0 0 0 0 37 �! 16:00 HourLy-Totats 0 1 0 9 9 0 0 0 0 0 0 0 26 LU; 5 38 so 23 2 0 0 0 0 0 0 119 16:15 16:30 0 2 9 15 a 1 0 0 0 0 0 0 35 -j 01 U .0 0 4 9 4 2 0 0 0 0 0 0 19 16.45 1 0 10 19 6 0 0 0 0 0 0 0 36 tn LU LU X� 17:00 0 1 6 a 6 0 0 0 0 -0 0 0 0 21 �j �- 1! Hourty TotaLs 1 3 51 24 3 0 o 0 0 0 111 (n LL. 0 17:15 0 0 4 8 6 1 0 0 0 0 0 0 19 17:30 1 0. 4 5 0 0 0 0 0 0 0 16 LL. < 17:45 0 1 2 6 6 3' 0 0 0 0 0 0 18 18:00 0 1 5 7 1 o 0 a 0 0 17 Lu� x! HourLy Totats 1 2 15 26 21 5 0 0 0 0 0 0 70 z ;7- 18:15 0 0 4 4 0 o 0 0 0 0 0 16 z LAJ LU; 18:30 2 2 4 9 2 0 0 0 0 0 0 19 18:45 0 21 6 7 4 0 0 0 0 0 0 a 19 19:00 .0 6 9 5 0 0 0 0 0 0 27 0 Hourty Totatz 2 10 21 33 15 0 0 0 0 0 0 0 81 U1 X 19:115 .0 4 5 12 4 0 0 0 0 0 0 0 25 j LL 19:30 0 2 11 22 2 0 0 a 0 0 0 0 2w z w 19:45 5 10 5 1 0 0 0 0 0 gn 20:00 HourLy Totats 0 0 1 15 12 a 36' 56 6 0 1 0 0 0 0 0 0 0 0 0 0 0 17 0 1' z 20,15 0 5 6 22 7 2 0 0 0 0 0 0 20:30 0 0 10 17 3 0 0 0 .0 0 0 30 20:45 0 1 5 15 3 0� 0 o 0 0 0 24 21:00 0 2 20 8, 0 1 0 0 0 39 Hourty Totats 0 a 29 74 21 2 1 0 0 0 0 0 135 21.15 1 4, 7 5 0 0 0 0 0 0 17 21:30 0 0 7 10 10 1 0 0 0 0 0 0 28 21:45 0 0 3 3 10 2 0. 0 0 0 a 22:00 0 1 2 0 0 --AO 0 0 0 Hourty Totats 1 21 30 5 0 0 0 0. 0 0 so 22:15 0 0 5 6 2 2 0 0 0 0 0 22:30 1 0 1 0 2 0 1 0 0 0 5 22:45 0 0 4 1 2 1 1 0 0 0 0 9 23:00 0 2 2 0 3 0 0 0 0 0 o 0 7 Hourty TotaLs 1 2 12 7 9 3 2 o o o 0 36 23:15 0 1 2 2 1 3 0 0 0 0 0 9: 23:30 0 1 0 1 3 0� 0 0 0 0 0 0 5 23:45 0 3 3 2 0 0 0 0 o 0 0 a 00:00 0 1 0 0 0 0: 0 0. 0 HourLy TotaLs 0 -6 6 5' 4 3 0 0 0' 4� 0 CIL 24 Deity TotaLa 13 as 343 550 286 38 3 0 0 0 0 0 1321 Percentage 1.0% 6.7X 26.0% 41.6% 21.7% 2.qj 0.2% 0.0% 0.0% 0. 0% 0.0% 0A, 7M "Y' Speed Report, 'Admiral Way 0 Arnie's, Edmonds'. pacre 7 Daily Control Session Summa Average Speed of All Vehicles ... 21.7.9 Median Speed ..................... 21.97 MPH Mode Speed ...................... 22.50 z 15th Percentile Speed .......... 16'.42 MPH 85th Percentile Speed ........... 27.25 MPH Lull cc 21 10 MPH Pace ..................... 15-25 (67.60k) U- Vehicles Exceeding 55 MPH ..... None d 0i Vehicles Exceeding 60 MPH ....... None 01 rn ! Vehicles Exceeding 65 MPH ...... None - L n Ul WX Jill AM Peak Hour ............. ...... 10:30 to 11:30 (58 vehicles) . �-j AM Peak Hour Factor ............. 72.5%* Cn LL 0 PM Peak Hour .................... 19:15 to 20:15 (135 vehicles) PM Peak Hour Factor ............. 80.4q; :3 24-Ho�r moving Total D S2 CO 01:00- 1188 02:00- 1197 03:00- 1193 04:00- 1193 05:00- 1191 06:00- 1145 07:00- 1197 08:00- 1183 X Uj! X! 09:00- 1184 10:00- 1156 11:00- 1156 12:00-, 1149 13:00- 1128 14:00- 1131 15.00 1153 16. -00- 1197 1- 1 17:00- 1250 18:00- 1244 19:00- 1231 20:00- 1253 21:00- 1308 22:00. 1323 23:00- 1315 24:00- 1321 Ot 03 UJI ml 0 Uj Ui X U- z z 0 C'. 0 Land Use: 420 Marina Description The marinas included In this analysis were both public and private facilities. In addition to docks of the sites surveyed also had social and club activities, limited retail, and berths for boats, some and restaurants. Additional Data Information on transit trip ends is not available. Information on person trip ends is not available. Information on truck trips is not available. Information on vehicle occupancy Is not available. Information on peak hours of the generator is not available. The studies were conducted In the late 1960's through late 1980's, In the San Francisco, San Diego, and Seattle metropolitan areas. The number of boat berths range from 108 to 1,750, the number of acres from 11 to 105, and parking spaces from 65 to 493. Source Numbers 6,12,19,101, 123,265 TiYp Generadon, January 1991 642 Institute of Transportation Engineers uaw riot ana 5,000 w 4,000 3,000 (D 2,000 Z, 1,000 leviation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........... .................. . ........ ............. ...... ................ ...................... .......... ........ ......... .......... ......... ....... ... ................. ....... ............ ...................... x )5,-- x 0-- 400 3 5 0 100 Ow 1100 X = Number of Berths X Actual Data Points Fitted Curve Fitted Curve Equation: T = 1.891 (X)"4­zj,1 0.795 ------ Average Rate R2 0.92 Trio Generation, January 1991 643 Institute of Transportation Engineers z F- Uj cc: LU -i U 0' U) 0 Cn LU LU U) LL LU 0. LL. BI D 0 LU. z z LU LU. mp U) ;7- w X �L- 0 z LLJ Cn 0 z E to Number of Studies: 2 Average Number of Berths: 362 Directional Distribution: 60% entering, 40% xiting Trip Generation Per Berth Average Rate Range of Rates Standard Deviation 0.19 0.17-0.21 Data Plot and Eauation 80 ..... ............ ................... ...... ...... ...... . . . . . . . . . . . . . . . . . w Q. a) x 70 ..... ............... * ............ .............. . ............ ........... 60 ..... .. ........ .................. ...... ........................... so 300 310 320 330 340 3W WO 3M M 390 400 410 420 430 X = Number of Berths X ACtUal Vata Points ------ Avirage Rate Fitted Curve Equation: Not given R2 = **** T'YP Generation, January iggi 645 Institute of Transportation Engineers 01 A 0 to CITY OF EDMONDS BARBARA FAHEY 260 STH AVENUE NORTH - EDMONDS, WA 98020 - 1206) 771-0220 FAX Q06) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works Planning Parks and Recreation Engineering St. 189 September 24, 1996 Mr. William M. Toskey Port of Edmonds 336 Admiral Way Edmonds, WA 98020 Subject., Withdrawal of Shoreline Substantial DevelopmentApplication. Dear Mr. Toskey: This letter is to acknowledge the withdrawal of the initial Shoreline Substantial Development Permit application for a dry boat storage building. We appreciate your response to our concerns and look forward to working with you on future iterations of this project and others. Please feel free to call it you have any questions or need more information. Sincerely, P Current Planning Supervisor PC: File No. SM-96-95 & Incorporated August 11, 1890 9 Sister Cities International — Hekinan, Japan Cc 2� LU _J LU, W _J (n LL 01 UJ LL 51 LU Z �_ 0 Z �- W LU c) LU UJ L) Z :F 0 Z M P-0 R T -OF E D M 0 N D S 336 ADMIRAL WAY EDMONDS. WASHINGTON 98020-7214 (206)774-0549 PAX (206) 774 -7837 Mr. Jeff-rey S. Wilson City of Edmonds Community Services Department 250 5" Ave N Edmonds, WA 98020 Dear Mr. Wilson: August 14, 1996 X 4111 *04 119,96 This letter is in response to your letter of August 7, 1996, subject "Comments on Environmental Determination for the Proposed New Dry Stack Storage Facility and Marina Improvements". This letter is also a follow-up to a letter submitted by Makers on behalf of the Port of Edmonds dated July 17, 1996 which contained the Application for Shoreline Substantial Development Permit, SEPA Checklist, legal descriptions, Adjacent Property Owners Checklist, Critical Areas Checklist, City of Edmonds Environmental Assessment, Port of Edmonds Mitigated Determination of Nonsignificance, and preliminary Architectural Design Board approval. This letter is also a follow-up to our recent discussions related to the Port of Edmonds application for a height variance related to a stack storage facility at the Port of Edmonds. As you requested in your August 7 letter, the Port of Edmonds is withdrawing its Environmental Determination as originally issued on July 22, 1996 for the new dry stack storage facility. The Port of Edmonds will also prepare appropriate environmental documents related to the latest version of the Port Master Plan. We are already committed to working with the City to ensure that the Port's Master Plan is compatible with the City's Comprehensive Plan and that any areas of disagreement are amicably resolved. The Port is committed to developing a dry stack storage project which is fully consistent with the current City Comprehensive Plan and documentation related to this project will be presented to the City within the next two to six weeks. The Port will also resubmit its application for a dry stack storage project that addresses all of the concerns of the City staff as well as the applicable concerns of various citizens. We will specifically address Marina Beach parking, traffic impacts, overall Port parking, and stream impacts. As agreed on August 14, 1996, the Port will provide draft copies of each application, permit analysis, or other appropriate document to the City staff for its consideration prior to official submittal. The Port is committed to working cooperatively with all elements of the City staff on this and other significant Port projects. I request that the City staff contact me if they have any questions or concerns related to any issues contained in this letter or in relation to other projects or information contained within various Port plans or documents. Sincerely, Wgi I I eiV. o s 4e Executive DirectdK 0 LI) LA. 01 W L.L <I M, 0; Z Oi �i �-; W W! 2 mi D L) 0 W W1 LU CD L) 0 Z 01 to %'Ity U1 zuinunus 250 Fifth Ave N Edmonds, WA 98020 Dear Mr. Wilson: This letter is in response to your letter of August 7, 1996, subject: "Comment on Environmental Determination for the Proposed New Dry Stack Storage Facility and Marina Improvements". While I acknowledge receipt and understanding of all the issues outlined in your letter, I do not necessarily agree with all of the conclusions related to those matters; however, it is extremely important that the Port and the City remain open to discussing all aspects of each of these issues. I believe that a proper discussion of various issues will result in improved understanding which will minimize our differences. In order to provide sufficient time for a comprehensive meeting to discuss all of these issues, I will extend the comment period and the period for the City to consider assuming SEPA jurisdiction to close of business August 15, 1996. I understand that you have established a meeting with the appropriate City parties at I p.m. on August 14. 1 will discuss all aspects of this issue with the Commission and the Port's legal counsel on August 12, 1996 and I will be prepared to discuss all related issues at the August 14 meeting. If you have any further questions on this matter, please contact me promptly. Sincerely, Wi li os Executive Dire cc: City of Woodway 0 AUG-28-113% 16:44 P.01 ROR T OF E 0 1A 0 N a S MOADMM"WAY ZM0XMWASHM70MffiM0-7214 (200) 774-0"0 August 8,1996 IrAX (206) 774-7837 Mr. Jeffrey S. Wilson City of Edmonas 250 Fifth Ave N Edmonds, WA 98020 A Dear Mr, Wilson- This letter Is in response to your letter of August 7, 1996, 3*eot' "Comment on -�A Envitoranental Determination for the Proposed New Dry stack Storage Facility and Marina Improvernents". While I acknowledge receipt and understanding of all the issues outlined in your Iota, I do not necessarily agree with all of the conclusions related to those tnattem; however, it is cxtmmcly importeint tbAt the Port and the City remain open to discussing all aspects of each of these Issues. I believe that a proper discussion of various issues will result in iinpro ved understanding which will minimize our differences. k, in order to provide sufficient timc for a eomprehensive meeting to discuss all of these issues, I will wdend the comment period and the period for tho City to consider assurnin SEPA jurisdiction to close of business August 15, 1996. I understand that you have cstablished a meeting with the appropriate City puties at I p.m. on August 14. 1 will discuss all aspects of this Issue with the Commission and the Port's legal counsel on August 12, 1996 and I will be prepared to discuss all related issues at the August 14 meeting. If you have any further questions on this matter, please contact mc promptly. sincerely, Z CI-- L.0 U) LU LU -J Ln U0- UJ It 01 UJ 3: 0 Z �- LU LLI 0 ;7-1 z LU Cn 0 z la V , AUG 7 1996 PLANivilvEi DER MEMORANDUM Date: Tuesday, August 06, 1996 To: Jeff Wilson, Planning Supervisor From: Arvilla Ohlde, Parks and Recreation Manager Subject: Response to SM.-96-95 Port of Edmonds Application Specific application content comments: Environmental Checklist 1. A46/page 2 of 14 Tle statement response; last sentence states "and new floats HAVE TO be constructed by 11/96-3/97" 1 could not determine the immediacy of the need; further explanation of timelines would assist in understanding timeline urgency. 2. A47/Exhibit C page 13: No listing of the number of dedicated stalls required to meet the guest moorage and public launch site, page 21: Approved Master Plan design reflects the retention of the dedicated parking provided by the Port for the public recreational user at Marina Beach Park., page 25: Approved detail of Master Plan design for Dry Boat Storage Layout identifies 26 parking spaces dedicated by the Port for public use at Marina Beach Park but no written comments or definition of need or future use provided in the formal document. page 26: Approved Master Plan states that the Dry Boat Storage building configuration "allows existing on -site parking to remain" page 26: Plan states under public access that "improvements are intended to allow pedestrian and wheelchairs continuous access along the marina waterfronf, page 28: Project 2000-2005 lists the "Admiral Way parking area improvements" with a "completion date" of "early 2000". a delay of adding 16 parking stalls along the extension of Admiral Way and on the east side of the Dry Stack Storage until 2000-2005 will not provide a parking benefit to Marina Beach Park if Port parking is removed from public park use. 3. A48/page 2 of 14 Add reference to environmental study "Feasibility Study Willow CreektUnion Oil Marsh Enhancement Plan" Juno 30, 1991 completed by Watershed Dynamics for City of Edmonds with Coastal Zone Management Grant Funds. The study needs to be included as the potential of options for daylighting the stream which provides enhancement and preservation of fish species. The document refers to the City of Edmonds 'J 0 potential relationship with the Port of Edmonds in the accomplishment of daylighting Willow Creek. z Ji 4. B#3 X Z "Unknown" wetland is Union Oil Marsh; "unknown" stream is Willow Creek �- LU cc 2 Content of each described in the "Union Oil Marsh Study" completed by Peggy Gaynor' < LU for the City of Edmonds funded by Coastal Zone Management Grant funds. -J U 0 a 5. B#5 U) LU additional fish: salmon; 1995/96 fish run through the tidegate area located on Port Cn LU X -J I . . . . . . property. The run returned to Willow Creek and into Union Oil Marsh and up to the Deer Cn LL Creek Hatchery. See preliminary "Edmonds Crossing Environmental Study for EIS" UJ Of 2 �' which is currently in progress through Washington Department of Transportation in g ti response to 4F Federal requirements to identify environmental impact. Ile study is U- currently being prepared by CH2M Hill. D 6. B#8h This needs further comment. Reference to existing documents regarding sensitive areas, z 7. B#10 Exhibit D The Height Variance Application Declaration and Height Waiver ftuest �- 0 Z �- page 7: #4/D Document states no plans for obstacles to pedestrian use; the boardwalk and L" LU viewing platform need to be open to the public at all times. page 8: #9/B Document states marina design will not "prevent pedestrian access to public U Uy 0- shorelines" "it 13 L- i page 8: #5 Document states does not cause any loss of " "use of surrounding UJ UJ X C.) properties" i= LNL 0 page 15: Document states "Parking Impact: This plan will allow almost all existing on- zi site parking to remain." .. UJ U) page IS: As part of the document it is stated that "Site Facilities" "The Port is proposing 0 to construct public restrooms as part of the new structure. These restrooms will serve z boardwalk and city park users during normal operating hours." 8. B#10b No northern view diagrams were presented in the document. Western and southern views do not reflect the views from the southern Marina Beach Park site, Without view information, no comment available to respond to the impact if any 9. B#10c Landscape plans included in the document for western, eastern and southern views of proposed project, the northern view from Marina Park not included. The layout design indicate the landscape proposal, but a side view looking north not included. In conversations with the Port, the Manager indicated that there would be canopy trees and 0 ground shrubs along the northern boundary of the park property. The document does not refer to any boundary fencing anticipated for the proposed project. Verbal statement by the Port Manager state the need to place security fencing between the Port and City property (Exhibit D/ pg 16 & 17) 10. B#12b Verbal conversations with the Port Manager have indicated that Marina Beach Park public t recreationalists mill have use of parking areas on Port property. Comments need to be included indicating that the use of the general Port parking areas, use of the east side parking along the project and the use of the public restrooms needs to be clearly defined = I K..;- tud Z F- LLJ Cr LLI _J L) 0 En a Cn LU LIJ to LL LU 0 LL < Ln D 0 :C z F_ 0 Z LIJ LLJ 0— LU LIJ U_ 0 z LU (n 0 z I f, M 9E and stated that all is available for public recreationalist using the Port and the City public recreational fhcilities, 11. B#12c The proposal states that public pedestrian access will be improved and retained along the waterfront and on the viewing platform. It needs to be assured through the permit process that the Port will insure the retention of the opening of the boardwalk, viewing area and pedestrian access to the Marina Beach Park. This areas should not be gated nor closed to the public for use. City Parks in Edmonds have an opening and closing time which is daylight to dusk but typically gates are not used to prohibit pedestrian access to public area. 12. Exhibit 'T" not in document; Exhibit "E" states "it is felt there is more than adequate on -site parking available." B#14f Exhibit 'T" not in proposal packet; Exhibit "E" does not provide enough data to make a determination of impact. Ile data appears to reflect a minimal need for more parking for the project and that the current parking in the area meets the need for the new project. This does not correspond to verbal conversations with the Port Manager which states that the Port will NEED to recover the dedicated parking stalls (22-26) currently dedicated for public park use at Marina Beach Park. 13. B#14g The response does not correspond with verbal conversations from the Port Manager. The report does not reflect the need to develop parking needs for the users of the planned project and the recovery of the areas from the dedicated public park use. Marina Beach Park is a 4.5 acres developed waterfront park located on Puget Sound, south of the Port of Edmonds Marina and west of the UNOCAL Oil Property. Marina Park is located adjacent to the proposed planned Dry Stack Storage improvements currently discussed in this application. Access to the site is off Admiral Way and through the Port of Edmonds. The site is currently owned by UNOCAL Oil but leased to the City for use as a public waterfront park. On the south side of the oil pipeline, additional flat unused shoreline exists, which is publicly accessed for waterfront park users. Facilities on the park site include a large open picnic area, a children's playground, portable restrooms, a beach volleyball couM a paved pathway, a car -top launch area and small parking lot. Because the park is heavily used in the summer months, the limited amount of parking and lack of permanent restrooms is often a problem. In the approved City of Edmonds Comprehensive Park, Recreation and Openspace Plan it notes that minor improvements are needed at the site which are a permanent restroom facility, new curbing and pave boat landing. Marina Beach Park is listed in the Comprehensive Plan as a "Waterfront Park". Waterfront parks are sites that permit the general public to physically reach or come very close to a saltwater shoreline. In Edmonds saltwater sites are very limited because of existing development. Because shoreline access is of limited quantity in Edmonds, waterfront parks should provide facilities and activities specifically oriented to that environment. Uses related to other park types should be located in another part of the city. Waterfront parks are sited as regional facilities" (page VI-5 City of Edmonds Park and Recreation Plan/Recommendations) On page VI-13 of the Comprehensive Park Plan it states "According to the Port's Master Plan much of the area used for parking is to be developed for boat storage. When that occurs there will be a major shortage of 7:77 z LU LIJ -J 0 tn UJ LU X: -J I-- Cn U.; LU LL. UJ z �- 0 Z �- UJ LU Cn, 0 LU U- 0 LU M parking at the Park. The City needs to work with the Port and examine other approaches to solving the parking problem." "Ibe overall intent of Edmonds should be to develop a continuous public shoreline access from Marina Beach Park at Edwards Point to Brackets Landing" "Waterfront parks serve regional needs" (page IV-16 of the Comprehensive Park Plan) and the Comprehensive Plan states that it is the recommendation that the standards of .6 acres per 1,000 population is the need in Edmonds. "The recommended standard of 0.6 acres per 1,000 population reflects the current interest and demand for additional waterfront sites in Edmonds. Using this standard, about 12.5 acres of additional waterfront park is currently needed." Marina Beach Park is listed in the Snohomish County Comprehensive Park and Opensapce Plan as a regional saltwater resource. (page 134) The plan states "to the extent practical, resource lands will be linked by all types of trail corridors to increase access to and through significant and visually interesting features" (pg. 133). Marina Beach Park is also listed in the Snohomish County Comprehensive Park Plan as a point on the "Puget Sound Marine Trail". This saltwater trail when fully developed in the State of Washington will provide cartop boating enthusiast on the Puget Sound waterfront trail opportunities and rest points extending from Edmonds to LaConner. The trail is promoted by the Washington Water Trails Association. (page 158) Hstorically, the City of Edmonds and the Port of Edmonds in the early 1980's worked cooperatively to develop Marina Beach Park as a public recreational benefit. The Port of Edmonds provided the property on the southern Port property to be developed and used for parking (22 stalls)for the park. The City and the Port cooperate on the operation of the facility and have an open relationship on the daily operation of the site. In response to the Port of Edmonds application for development of the dry storage facility, the following points need to be considered in relationship to the adjacent public park facility: • The need for the removal and use of the Port of Edmonds portion of the parking provided for or review. The approved Master Plan Marina Beach is not stated in the documents provided f designs do not indicate the removal of the current parking in Marina Beach, nor is there any written documentation of need nor reasons for the removal of the use of the current dedicated parking provided to the public recreational use at Marina Beach. • Exhibit D The Height Variance Application Declaration is the only document that makes any indication of the need for 26 stalls of parking for the proposed project. The only reference is a highlighted area and a written reference to 26 parking stalls. There are no written reasons for the need nor any explanations. The document continues to stress that parking is available at the Port and no more parking is needed for this project. Ile opposite is stated in question # 12 of the Environmental Checklist (page 3 of 14). The statement reads the boat storage facility "to be located at the existing boat storage shed location" no need is listed to recover the 26 parking stalls. Page 9 of 14 states that 4-8 people will be employed at the storage facility. • Verbal conversations with the Port Manager during this past month have made indications that there is a need for the removal of the parking dedicated to recreational use at Marina Beach as the new project proposal needs to have the stalls for employees and boat visitors to the dry stack storage. This is not reflected in the written documents nor in the approved Master Plan. (page 21 states parking to remain) • As part of the proposed project the Port has agreed to provide a public reWoom for public use. The addition of this element is beneficial to the recreationalist using the boardwak viewing areas and the adjacent public waterfront park. With the addition of a public restroom, the potential elimination of the portable restroorn will be beneficial to the public recreationlists. Verbal conversations with the Port indicate that they may also be interested in providing a public meeting room with availability to the public for use. Both of these facilities would be located on Port property and would be in the best interest of the City of Edmonds to have the public facilities maintained and operated by the Port of Edmonds. z In conversations with the Port Manager it was stated that the need for the removal of the parking dedicated for park use was to provide an area in preparation for the future phase LU Cr 2 development of the cast/west breakwater to provide for vehicle access to the water to < =) LU accommodate passenger/cruise vessels. The development of this option stated as a Phase III -J 0 project (page 22 of Master Plan) follows the bridging of the gap in the wave barrier where (n 0 small boats will be entering and exiting after the Phase 11 development. Ile Phase III Cn LU W development is not planned until 2004. The need to take parking from the current use results in (n U. 11 an impact to the park. This reasoning is not stated in the formal presented document nor in the 0 Port Master Plan. It was also stated verbally that the need to remove the current dedicated park parking was to provide a secure area for boat owners visiting the boat storage, and a potential for the owners to access their boats to work on them outside of the dry storage facility. In the drawing diagrams, LU the design indicates that in the south western comer of the upland project, boats are outside of z the facility. This may be a need but it is not stated in the presented documents nor in the �- 0 Z �- approved Master Plan. LU W If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the C3 vehicle entrance into Marina Beach Park becomes a dead-end. Currently the amount of cn, 0 dedicated parking and the parking configuration allows for vehicle egress out of the park. 0 W With the need to eliminate the parking on the north side of the park, the ability for recreational users to enter Marina Beach Park and then turn around and exit becomes impossible. To �!t 0 accommodate the impact, the City of Edmonds would need to diminish the park openspace Z .. z areas to provide for a turn around on the west end of the one row of parking stalls located at W (n the northern boundary of the site. 0 If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the z elimination of parking creates an impact on the park. The Port of Edmonds in verbal conversations has stated that they will provide 16 additional parking stalls on the cast side of the Boat Storage Facility on the western side of the extension of Admiral Way. They have also stated that they will make up the remaining deficit in the parking areas to the north of the dry boat storage area. It was stated that they would also provide directional signage to provide for the recreational user opportunities to be aware of the parking areas set aside for recreational user visiting Marina Beach Park. The additional 16 parking stalls are discussed in the presented documents but no indications of additional public park parking use is discussed as provided through the proposal. If the removal of the dedicated public park parking (22-26 stalls) is justified and needed the 0 elimination of parking creates an impact on the park. An option that could be designed by the Port is a joint use of the area between the southern boarder of the dry boat storage and the southern edge of the Marina Beach Park city parking stalls. This entire area could be configured to provide for joint parking use, the entrance and exit lanes could be designed, the public could access the public restroom on the SE comer of the building with ease and the secured gate could be placed between the joint parking lot and the boat owners outside work area. This design concept would provide a greater benefit to the area without adverse stress on the parking needs of the area. (1) rn LLI LU C2 LL Z LU L) 0 0 Lu UL UJ 2 D u 0 LL 0 D a LU Lu di L) Z Ef r 0 Powers power, by mutual agreement, to exercise jointly all powers granted to each individual district, and in the exercise of such powers shall have the right and power to acquire jointly all lands, property, property rights, leases, or easements necessary for their purposes, either entirely within or partly within or partly without or entirely with6ut such districts: PROVIDED, That any two or more districts so acting jointly, by mutual agreement, shall not acquire any real property or real property rights in any other port district without the consent of such district. A district may enter into any contract with the United States, or any state, county, or municipal corporation, or any department of those entities, for carrying out any of the powers that each of the contracting parties may by law exercise separately. (1961 c 24 § 1.] 53.08.245 Economic development programs autho- rized. It shall be in the public purpose for all port districts to engage in economic development programs. In addition, port districts may contract with nonprofit corporations in furtherance of this and other acts relating to economic development. (1985 c 125 § 1.] 53.08.250 Participation in world fairs or expositions authorized. See chapter 35.60 RCW. 53.08-255 Tourism promotion authorized. Any port district in this state, acting through its commission, has power to expend moneys and conduct promotion of resourc- es and facilities in the district or general area by advertising, publicizing, or otherwise distributing information to attract visitors and encourage tourist expansion. (1984 c 122 § 10.1 53.08.260 Park and recreation facilities. A poF t district may construct, improve, maintain, and operate public park and recreation facilities when such facilities are necessary to more fully utilize boat landings, harbors, wharves and piers, air, land, and water passenger and transfer terminals, waterways, and other port facilities authorized by law pursuant to the port's comprehensive plan of harbor improvements and industrial development. (1965 c 81 § 1.1 Harbor improvement plan: RCW53.20.010. 53.08.270 Park and recreation facilities —Approval of other agencies. Before undertaking any such plan for the acquisition and operation of any park or recreational facility the proposed plan therefor shall be first submitted in writing to the director of the parks and recreation commission and to the governing body of any county or municipal park agency having jurisdiction in the area. The state director and/or such county or municipal park agency shall examine the port's proposed plan, and may disapprove such proposed plan if it is found to be in conflict with state or local park and recreation plans for the same area. If such proposed port plan is disapproved the port district shall not proceed further with such plan. If the state director or the governing body of the county or municipal agency does not respond in writing to the port within sixty days, it shall be deemed that approval has been granted. [1965 c 81 § 2.] (1994 Ed.) 53.08.240 53.08-280 Police officers—Appointinent autho- rized —Jurisdiction. Any port district operating an airport with a police department as authorized by RCW 14.08.120 or designated as a port of entry by the federal government is authorized to appoint police officers with full police powers to enforce all applicable federal, state, or municipal statutes, rules, regulations, or ordinances upon any port -owned or operated properties or operations: PROVIDED, That such police officers must have successfully graduated from a recognized professional police academy or training institu- tion. [1981 c 97 § 1; 1974 ex.s. c 62 § 1.] 53.08.290 Intermodal movement of interstate and foreign carg6—Restrictions. In addition to the other powers under this chapter, a port district, in connection with the operation of facilities and improvements of the district, may perform all necessary activities related to the intermodal movement of interstate and foreign cargo: PROVIDED, That nothing contained herein shall authorize a port district to engage in the transportation of commodities by motor vehicle for compensation outside the boundaries of the port district, A port district may, by itself or in conjunction with public or private entities, acquire, construct, purchase, lease, contract for, provide, and operate rail services, equipment, and facilities inside or outside the port district: PROVIDED, That such authority may only be exercised outside the boundaries of the port district if such extraterritorial rail services, equipment, or facilities are found, by resolution of the commission of the port district exercising such authority, to be reasonably necessary to link the rail services, equip- ment, and facilities within the port district to an interstate railroad system; however, if such extraterritorial rail services, equipment, or facilities are in or are to be located in one or more other port districts, the commission of such other port district or districts must consent by resolution to the pro- posed plan of the originating port district which consent shall not be unreasonably withheld: PROVIDED FURTHER, That no port district shall engage in the manufacture of rail cars for use off port property. (1981 c 47 § 1; � 1980 c 110 § 2.] Purpose-1980 c 110: Me purpose of this act is to: (1) Clarify existing law as to the authority of port districts to perform certain cargo movement activities and to contract for or otherwise provide facilities for rail service for the movement of such cargo; and (2) Provide authority for port districts to assist in development of the recreation -tourism industry by acquiring and operating certain watercraft in limited areas." [ 1980 c 110 § 1.] 53.08.295 Passenger carrying watercraft. A port district may acquire, lease, construct, purchase, maintain, and operate passenger carrying vessels on interstate navigable rivers of the state and intrastate waters of adjoining states. Service provided shall be under terms, conditions, and rates to be fixed and approved by the port commission. Operation of such vessels shall be subject to applicable.state and federal laws pertaining to such service. ( 1980 c I 10 § 3.] Purpose-1980 c 110: See note following RCW 53.08290. 53-08-300 Rewards for arrest and conviction of Persons committing criminal offewes against port district authorized. See RCW 10.85.030. (1) En LU _J Ln LU X U_ Z U.1 2 D 0 0 a Lit U- Z 7' l— Z D L) 0 0 D 0 LU M l- 0 uJ D a E r 0 :01 Powers power, by mutual agreement, to exercise jointly all powers granted to each individual district, and in the exercise of such powers shall have the right and power to acquire jointly all lands, property, property rights, leases, or easements necessary for their purposes, either entirely within or partly within or partly without or entirely without such districts: PROVIDED, That any two or more districts so acting jointly, by mutual agreement, shall not acquire any real property or real property rights in any other port district without the consent of such district. A district may enter into any contract with the United States, or any state, county, or municipal corporation, or any department of those entities, for carrying out any of the powers that each of the contracting parties may by law exercise separately. (1961 c 24 § 1.1 53.08.245 Economic development programs autho- rized. It shall be in the public purpose for all port districts to engage in economic development programs. In addition, port districts may contract with nonprofit corporations in furtherance of this and other acts relating to economic development. (1985 c 125 § 1.] 53.08.250 Participation in world fairs or expositions authorized. See chapter 35.60 RCW. 53-08-255 Tourism promotion authorized. Any port district in this state, acting through its commission, has power to expend moneys and conduct promotion of reso?rc- es and facilities in the district or general area by advertising, publicizing, or otherwise distributing information to attract visitors and encourage tourist expansion. [1984 c 122 § 10.) 53.08.260 Park and recreation facilities. A po5 t district may construct, improve, maintain, and operate public park and recreation facilities when such facilities are necessary to more fully utilize boat landings, harbors, wharves and piers, air, land, and water passenger and transfer terminals, waterways, and other port facilities authorized by law pursuant to the port's comprehensive plan of harbor improvements and industrial development. (1965 c 81 § 1.] Harbor improvement ptan: RCW SIM= 53.08.270 Park and recreation faeflities--Approval of other agencies. Before undertaking any such plan for the acquisition and operation of any park or recreational facility the proposed plan therefor shall be first submitted in writing to the director of the parks and recreation commission and to the governing body of any county or municipal park agency having jurisdiction in the area. The state director and/or such county or municipal park agency shall examine the port's proposed plan, and may disapprove such proposed plan if it is found to be in conflict with state or local park and recreation plans for the same area. If such proposed port plan is disapproved the port district shall not proceed ftirther with such plan. If the state director or the governing body of the county or municipal agency does not respond in writing to the port within sixty days, it shall be deemed that approval has been granted. (1965 c 81 § 2.] (1994 Ed) 53.08.240 53.08.280 Police officers —Appointment autho. rized—Jurisdiction. Any port district operating an airport with a police department as authorized by RCW 14.08,120 or designated as a port of entry by the federal government is authorized to appoint police officers with full police powers to enforce all applicable federal, state, or municipal statutes, rules, regulations, or ordinances upon any port -owned or operated properties or operations: PROVIDED, That such police officers must have successfully graduated from a recognized professional police academy or training institu- tion. (1981 c 97 § 1; 1974 cx.s. c 62 § 1.] 53-08.290 Intermodal movement of interstate and foreign cargii—Restrictions. In addition to the other powers under this chapter, a port district, in connection with the operation of facilities and improvements of the district, may perform all necessary activities related to the intermodal movement of interstate and foreign cargo: PROVIDED, That nothing contained herein shall authorize a port district to engage in the transportation of commodities by motor vehicle for compensation outside the boundaries of the port district. A port district may, by itself or in conjunction with public or private entities, acquire, construct, purchase, lease, contract for, provide, and operate rail services, equipment, and facilities inside or outside the port district: PROVIDED, That such authority may only be exercised outside the boundaries of the port district if such extraterritorial rail services, equipment, or facilities are found, by resolution of the commission of the port district exercising such authority, to be reasonably necessary to link the rail services, equip- ment, and facilities within the port district to an interstate railroad system; however, if such extraterritorial rail services, equipment, or facilities are in or are to be located in one or more other port districts, the commission of such other port district or districts must consent by resolution to the pro- posed plan of the originating port district which consent shall not be unreasonably withheld: PROVIDED FURTHER, That no port district shall engage in the manufacture of rail cars for use off port property. (1981 c 47 § 1;.1980 c 110 § 2.1 Purpose-1980 c 110: Me purpose of this act is to: (1) CMfY existing law as to the authority of port districts to perform certain cargo movement activities and to contract for or otherwise provide facilities for rail service for the movement of such cargo; and (2) Provide authority for port districts to assist in development of the rccreation-tourism industry by acquiring and operating certain watercraft in limited areas." [1980 c 110 § 1.] 53.08.295 Passenger carrying watercraft. A port district may acquire, lease, construct, purchase, maintain, and operate passenger carrying vessels on interstate navigable rivers of the state and intrastate waters of adjoining states. Service provided shall be under terms, conditions, and rates to be fixed and approved by the port commission. Operation of such vessels shall be subject to applicable.state and federal laws pertaining to such service. (1980 c 110 § 3.1 Purpose-1980 c 110: See note following RCW 53.08290. S3.08.300 Rewards for arrest and conviction of persons committing criminal offenses against port district authorized. See RCW 10.85,030. 10 Z- LU cc LU L) _J U) LU LU _J U) LL, —0 LLJ Z- �1 < —.1 CC LL LU Z F_ l.— 0 Z �— LLI Lli M U U), LLJ Lul LL 0 Z Lii Cn Z EW ME Powers power, by mutual agreement, to exercise jointly all powers granted to each individual district, and in the exercise of such powers shall have the right and power to acquire jointly all lands, property, property rights, leases, or easements necessary for their purposes, either entirely within or partly within or partly without or entirely witho'ut such districts: PROVIDED, That any two or more districts so acting jointly, by mutual agreement, shall not acquire any real property or real property rights in any other port district without the consent of such district. A district may enter into any contract with the United States, or any state, county, or municipal corporation, or any department of those entities, for carrying out any of the powers that each of the contracting parties may by law exercise separately. [1961 c 24 § 1.] 53.08.245 Economic development programs autho- rized. It shall be in the public purpose for all port districts to engage in economic development programs. In addition, port districts may contract with nonprofit corporations in furtherance of this and other acts relating to economic development. [1985 c 125 § 1.] 53.08.250 Participation in world fairs or expositions authorized. See chapter 35.60 RCW. 53.08.255 Tourism promotion authorized. Any port district in this state, acting through its commission, has power to expend moneys and conduct promotion of resourc- es and facilities in the district or general area by advertising, publicizing, or otherwise distributing information to attract visitors and encourage tourist expansion. [1984 c 122 § 10.1 53.08.260 Park and recreation facilities. A poTt district may construct, improve, maintain, and operate public park and recreation facilities when such facilities are necessary to more fully utilize boat landings, harbors, wharves and piers, air, land, and water passenger and transfer terminals, waterways, and other port facilities authorized by law pursuant to the port's comprehensive plan of harbor improvements and industrial development. [1965 c 81 § 1.1 Harbor improvement plan: RCW53.20.010. 53.08.270 Park and recreation facilities —Approval of other agencies. Before undertaking any such plan for the acquisition and operation of any park or recreational facility the proposed plan therefor shall be first submitted in writing to the director of the parks and recreation commission and to the governing body of any county or municipal park agency having jurisdiction in the area. The state director and/or such county or municipal park agency shall examine the port's proposed plan, and may disapprove such proposed plan if it is found to be in conflict with state or local park and recreation plans for the same area. If such proposed port plan is disapproved the port district shall not proceed further with such plan. If the state director or the governing body of the county or municipal agency does not respond in writing to the port within sixty days, it shall be deemed that approval has been granted. (1965 c 81 § 2.) (I S94 Ed.) 53.08.240 53.08.280 Police officers —Appointment autho- rized —Jurisdiction. Any port district operating an airport with a police department as authorized by RCW 14,08.120 or designated as a port of entry by the federal government is authorized to appoint police officers with full police powers to enforce all applicable federal, state, or municipal statutes, rules, regulations, or ordinances upon any port -owned or operated properties or operations: PROVIDED, That such police officers must have successfully graduated from a recognized professional police academy or training institu- tion. [1981 c 97 § 1; 1974 ex.s. c 62 § 1.) 53.08.290 Intermodal movement of interstate and foreign cargo —Restrictions. In addition to the other powers under this chapter, a port district, in connection with the operation of facilities and improvements of the district, may perform all necessary activities related to the intermodal movement of interstate and foreign cargo: PROVIDED, That nothing contained herein shall authorize a port district to engage in the transportation of commodities by motor vehicle for compensation outside the boundaries of the port district. A port district may, by itself or in conjunction with public or private entities, acquire, construct, purchase, lease, contract for, provide, and operate rail services, equipment, and facilities inside or outside the port district: PROVIDED, That such authority may only be exercised outside the boundaries of the port district if such extraterritorial rail services, equipment, or facilities are found, by resolution of the commission of the port district exercising such authority, to be reasonably necessary to link the rail services, equip- ment, and facilities within the port district to an interstate railroad system; however, if such extraterritorial rail services, equipment, or facilities are in or are to be located in one or more other port districts, the commission of such other port district or districts must consent by resolution to the pro- posed plan of the originating port district which consent shall not be unreasonably withheld: PROVIDED FURTHER, That no port district shall engage in the manufacture of rail cars for use off port property. [1981 c 47 § 1; 1980 c 110 § 2.] Purpose--1980 c 110: "ne purpose of this act is to: (1) Clarify existing law as to the authority of port districts to perform certain cargo movement activities and to contract for or otherwise provide facilities for rail service for the movement of such cargo; and (2) Provide authority for port districts to assist in development of the recreation -tourism industry by acquiring and operating certain watercraft in limited areas," [1980 c i to § ij 53-08.295 Passenger carrying watercraft. A port district may acquire, lease, construct, purchase, maintain, and operate passenger carrying vessels on interstate navigable rivers of the state and intrastate waters of adjoining states. Service provided shall be under terms, conditions, and rates to be fixed and approved by the port commission. Operation of such vessels shall be subject to applicable,state and federal laws pertaining to such service. [1980 c 110 § 3.1 Purpose-1980 e 110: See note following RCW 53.08.290. 53.08.300 Rewards for arrest and conviction of persons committing criminal offenses against port district authorized. See RCW 10.85.030. (Title 53 RM—page 13i Z. Lu Cc U.1 U _J U 0 U) 0 U) LU LLJ _J U) LL. W 0 LL Di Ln Cl =: L, �- 3: Z i- �_ 0 Z �- W Lu 0 Ui �L 0 Z Lu (n U :-r �- f7 0 Z 0 to � .�'St. 189, Ak CITY OF EDMONDS ' BARBARA FAHEY MAYOR 250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planning * Parks and Recreation * Engineering VIA FAX (774-7837) AND U.S. MAIL August 7, 1996 Mt. William Toskey Executive Director Port of Edmonds 336 Admiral Way Edmonds, WA 98020 Subject: COMMENTS ON PROPOSED NEW E\dPROVENENTS Dear Mr. Toskey: ENVIRONNIENTAL DETERMINATION FOR TBE DRY STACK STORAGE FACILITY AND MARINA The City has received the permit application and environmental determination for the Port's proposed new dry stack storage facility and marina improvements project. In our staff deliberations of the documentation provided, the City has found that the documentation is incomplete, the proposed project is not part of the Port's Master Plan chapter of the City's adopted Comprehensive Plan, and, most importantly, the Port's most recent adopted Master Plan has not been appropriately subjected to SEPA review per the state's process. As the City's responsible official for review of your application, I have discussed this matter thoroughly with all the City's key review parties, including Community Services Director Paul Mar. Our goal is to have an adequate environmental review done in a cost effective manner. As you are aware, the Port elected to act as lead agency in the environmental determination process. If the City were to decide that the Port either didn't adequately submit a complete environmental determination document or didn't adequately address key environmental issues, it could assume lead agency status in the environmental process. This action by the City would automatically that an Environmental Impact Statement be prepared, an effort which could cost our $60,000 to $100,000. The -City's preference is to cooperatively resolve its concerns with the Port in a manner that minimizes the additional cost to its (City and/or Port) citizens. In order to achieve this goal, the City sincerely requests that the Port of Edmonds 1) withdraw its environmental determination originally issued on July 22nd for the above noted project; 2) issue an appropriate environmental determination statement for the Port's recently completed. Master Plan, 3) work with the City to assure that the City's Comprehensive Plan is modified to include the Port's new Master Plan, 4) develop the proposed dry stack storage project consistent with the approved and appropriately NPOR7�2-DOW-AUCW * Incorporated August 11, 1890 9 CORPLEVAGENCY Sister Cities International — Hekinan, Japan nit its application for the dry stack storage project that processed Master Plan, and 5) resubr f the City and Port District. those raised by citizens I the City's concerns as well as To ensure that addresses ) your favorable, reply to the City's request. look forward t( s letter, the City reserves the On behalf of the City, I cumented in thi port not provide the City the Port understands the seriousness of the matters do 3roject should the nse to this assume lead agency status for the proposed I ine for your respo right to August 9, 1"6 *- The deadl* with a written reply by 3:00 PM on comment period on the environmental detirmination. request is dictated by the expiration of the at 771-0223. if you have further questions regarding this matter, please contact me Or Paul Mar Sincerely, planning Division Community Services Department PffTey S Wilso i, AICP Current ilanning Supervisor SEPA Responsible Official PC-. VIfile No. SM-96-95 Mayor Fahey Scott Snyder, City Attorney imunity Services Director Paul Mar, Cotr Rob Chave, planm�,Iz Manager Steve Bullock� Projict Planner Department Of Ecology . . . . . . . . . . . . . W - - - - - - ......... - MEMORANDUM IV x AUG - t7 1996 PLANNING DEPT. Date: Tuesday, August 06, 1996 To: Jeff Wilson, Planning Supervisor From: Arvilla OhIde, Parks and Recreation Manager Subject: Response to SM.-96-95 Port of Edmonds Application Specific application content comments: Environmental Checklist 1. A"/page 2 of 14 The statement response; last sentence states "and new floats HAVE TO be constructed by 11/96-3/9711 1 could not determine the immediacy of the need; further explanation of timelines would assist in understanding timeline urgency. 2. A#7/Exhibit C page 13: No listing of the number of dedicated stalls required to meet the guest moorage and public launch site. page 21: Approved Master Plan design reflects the retention of the dedicated parking provided by the Port for the public recreational user at Marina Beach Park., page 25: Approved detail of Master Plan design for Dry Boat Storage Layout identifies 26 parking spaces dedicated by the Port for public use at Marina Beach Park but no written comments or definition of need or future use provided in the formal document. page 26: Approved Master Plan states that the Dry Boat Storage building configuration "aHows existing on -site parking to remain" page 26: Plan states under public access that "improvements are intended to allow pedestrian and wheelchairs continuous a6cess along the marina waterfront" page 28: Project 2000-2005 lists the "Admiral Way parking area improvements" with a "completion date" of "early 2000"; a delay of adding 16 parking stalls along the extension of Admiral Way and on the cast side of the Dry Stack Storage until 2000-2005 will not provide a parking benefli to Marina Beach Park if Port parking is removed from public park use. 3. A#8/page 2 of 14 Add reference to environmental study "Feasibility Study Willow Creek]Union Oil Marsh Enhancement Plan" June 30, 1991 completed by Watershed Dynamics for City of Edmonds with Coastal Zone Management Grant Funds. The study needs to be included as the potential of options for daylighting the stream which provides enhancement and preservation of fish species. The document refers to the City of Edmonds 0 t L0 Potential relationship with the Port of Echnonds in the accomplishment of daylighting WiHow Creek. z < 3: 4. B#3 "Unknown" wetland is Union Oil Marsh; own- stream is Willow Creek %mkn ,-- 8 cc 2 Content of each described in the "Union Oil Marsh Study" completed by Peggy Gaynor' < n for the City of Edmonds funded by Coastal Zone Management Grant funds. LU U -J 0 5. B#5 0 additional fish: salmon; 1995/96 fish run through the tidegate area located on Port UJ 3: property. The run returned to Willow Creek and into Union Oil Marsh and up to the Deer -JJ �- (n U. Creek Hatchery. See preliminary "Edmonds Crossing Environmen S dy for E S" tal tu I LU 0 which is currently in progress through Washington Department of Transportation in response to 4F Federal requirements to identify environmental impact. The study is being <. currently prepared by CH2M Hill. L,L ,n 31 6. B#8h a This needs further comment. Reference to existing documents regarding sensitive areas. z �- 7. B#10 Exhibit D Declaration and Height, Waiver ftuest �- 0 page 7: #4/D Document states no plans for obstacles to pedestrian use; the boardwalk and Z �- UJ LU viewing platform need to be open to the public at all times. page 8: #9/B Document states marina design will not "prevent pedestrian access to public (n shorelines" 0 ;7 C3 page 8: #5 Document states "it does not cause any loss of " "use of surrounding LU properties" page 15: Document states "Parking Impact: Thi s plan will allow almost all existing on- U- 0 z:: site parking to remain." .. uJ cn page 18: As part of the document it is stated that "Site Facilities" "The Port is proposing to construct public restrooms as part of the new structure. These restrooms will serve 0 z boardwalk and city park users during normal operating hours." 8. B#10b No northern view diagrams were presente d* in the document. Western and southern views do not reflect the views from the southern Marina Beach Park site. Without view information, no comment available to respond to the impact if any 9. B#10C Landscape plans included in the document for western, eastern and southern views of proposed project the northern view from Marina Park not included. The layout design indicate the landscape proposal, but a side view looking north not includa In conversations with the Port, the Manager indicated that there would be canopy trees and 0 ground shrubs along the northern boundary of the park property, The document does not refer to any boundary fencing anticipated for the proposed project. Verbal statement by the Port Manager state the need to place security fencing between the Port and City property (Exhibit D/ pg 16 & 17) 10. B#12b Verbal conversations with the Port Manager have indicated that Marina Beach Park public recreationalists will have use of parking areas on Port property. Comments need to be included indicating that the use of the general Port parking areas, use of the east side parking along the project and the use of the public restrooms needs to be clearly defined Z77711 0 LU Cc L.0 L) _J L) 0 En 0 Cn UJ LU _J U) U-f 0 LL1 LL 31 LLJ, 0 Z F- UJ UJ LLJ F- F- LL 0 z Lu tn U -F F- 0 z E01 C 0 and stated that all is available for public recreationalist using the Port and the City public recreational facilities. It. B#12c The proposal states that public pedestrian access will be improved and retained along the waterfront and on the viewing platform. It needs to be assured through the pern-dt process -that the Port will insure the retention of the opening of the boardwalk, viewing area and pedestrian access to the Marina Beach Park. This areas shou)d not be gated nor closed to the public for use. City Parks in Edmonds have an opening and closing time which is daylight to dusk but typically gates are not used to prohibit pedestrian access to public area. 12. Exhibit 'T' not in document; Exhibit "E" states "it is felt there is more than adequate on -site parking available." B#14f Exhibit 'T' not in proposal packet; Exhibit "E" does not provide enough data to make a determination of impact. The data appears to reflect a minimal need for more parking for the project and that the current parking in the area meets the need for the new project. This does not correspond to verbal conversations with the Port Manager which states that the Port will NEED to recover the dedicated parking stalls (22-26) currently dedicated for public park use at Marina Beach Park. 13. B#14g The response does not correspond with verbal conversations from the Port Manager. 'Me report does not reflect the need to develop parking needs for the users of the planned project and the recovery of the areas from the dedicated public park use. Marina Beach Park is a 4.5 acres developed waterfront park located on Puget Sound, south of the Port of Edmonds Marina and west of the UNOCAL Oil Property. Marina Park is located adjacent to the proposed planned Dry Stack Storage improvements currently discussed in this application. Access to the site is off Admiral Way and through the Port of Edmonds. The site is currently owned by UNOCAL Oil but leased to the City for use as a public waterfront park. On the south side of the oil pipeline, additional flat unused shoreline exists, which is publicly accessed for waterfront park users. Facilities on the park site include a large open picnic area, a children's playground, portable restrooms, a beach volleyball court, a paved pathway, a car -top launch area and small parking lot. Because the park is heavily used in the summer months, the limited amount of parking and lack of permanent restrooms is often a problem. In the approved City of Edmonds Comprehensive Park, Recreation and Openspace Plan it notes that minor improvements are needed at the site which are a permanent restroom facility, new curbing and pave boat landing. Marina Beach Park is listed in the Comprehensive Plan as a "Waterfront Park". Waterfront parks Itwate are sites that permit the general public to physically reach or come very close to a sa r shoreline. In Edmonds saltwater sites are very limited because of existing development. Because shoreline access is of limited quantity in Edmonds, waterfront parks should provide facilities and activities specifically oriented to that environment. Uses related to other park types should be located in another part of the city. Waterfront parks are sited as regional facilities" (page VI-5 City of Edmonds Park and Recreation Plan/Recommendations) On page VI-13 of the Comprehensive Park Plan it states "According to the Port's Master Plan much of the area used for parking is to be developed for boat storage. When that occurs there will be a major shortage of 10 X Z �- LU Cc LU 0 Cn 0 (n LU LU -J Ln LL 0 LU 2 � -J LL D LU F- X Z F- F- 0 Z �- LU UJ U cn 0- 0 F- LU Lu LL 0 z Lu (n 0 z 0 parking at the Park. The City needs to work with the Port and examine other approaches to solving the parking problem." "The overall intent of Edmonds should be to develop a continuous public shoreline access from Marina Beach Park at Edwards Point to Brackets Landing" 'Vaterfront parks serve regional needs" (page IV- 16 of the Comprehensive Park Plan) and the Comprehensive Plan states that it is the recommendation that the standards of .6 acres per 1,000 population is the need in Edmonds. "T'he recommended standard of 0.6 acres per 1,000 population reflects the current interest and demand for additional waterfront sites in Edmonds. Using this standard, about 12.5 acres of additional waterfront park is currently needed." Marina Beach Park is listed in the Snohomish County Comprehensive Park and Opensapce Plan as a regional saltwater resource. (page 134) The plan states "to the extent practical, resource lands will be linked by all types of trail corridors to increase access to and through significant and visually interesting features" (pg. 133). Marina Beach Park is also listed in the Snohomish County Comprehensive Park Plan as a point on the "Puget Sound Marine Trail". This saltwater trail when ful[ly developed in the State of Washington will provide cartop boating enthusiast on the Puget Sound waterfront trail opportunities and rest points extending from Edmonds to LaConner. The trail is promoted by the Washington Water Trails Association. (page 158) Hstorically, the City of Edmonds and the Port of Edmonds in the early 1980's worked cooperatively to develop Marina Beach Park as a public recreational benefit. The Port of Edmonds provided the property on the southern Port property to be developed and used for parking (22 stalls)for the park. The City and the Port cooperate on the operation of the facility and have an open relationship on the daily operation of the site. In response to the Port of Edmonds application for development of the dry storage facility, the following points need to be considered in relationship to the adjacent public park facility: • The need for the removal and use of the Port of Edmonds portion of the parking provided for Marina Beach is not stated in the documents provided for review. The approved Master Plan designs do not indicate the removal of the current parking in Marina Beach, nor is there any written documentation of need nor reasons for the removal of the use of the current dedicated parking provided to the public recreational use at Marina Beach. • Exhibit D The Height Variance Application Declaration is the only document that makes any indication of the need for 26 stalls of parking for the proposed project. The only reference is a highlighted area and a written reference to 26 parking stalls. There are no written reasons for the need nor any explanations. The document continues to stress that parking is available at the Port and no more parking is needed for this project. Ile opposite is stated in question #12 of the Environmental Checklist (page 3 of 14). The statement reads the boat storage facility "to be located at the existing boat storage shed location" no need is listed to recover the 26 parking stalls. Page 9 of 14 states that 4-8 people will be employed at the storage facility. • Verbal conversations with the Port Manager during this past month have made indications that there is a need for the removal of the parking dedicated to recreational use at Marina Beach as the new project proposal needs to have the stalls for employees and boat visitors to the dry stack storage. This is not reflected in the written documents nor in the approved Master Plan. (page 21 states parking to remain) As part of the proposed project the Port has agreed to provide a public restroom for public use. The addition of this element is beneficial to the recreationalist using the boardwalk viewing areas and the adjacent public waterfront park. With the addition of a public mstroom, the potential elintination of the portable rewoorn will be beneficial to the public recreationlists. Verbal conversations with the Port indicate that they may also be interested in providing a �V. public meeting room with availability to the public for use. Both of these facilities would be located on Port property and would be in the best interest of the City of Edmonds to have the public facilities maintained and operated by the Port of Edmonds. Z In conversations with the Port Manager it was stated that the need for the removal of the Z parking dedicated for park use was to provide an area in preparation for the future phase UJ cc 2 development of the east/west breakwater to provide for vehicle access to the water to < accommodate passenger/cruise vessels. Ile development of this option stated as a Phase IH UJ -J 0 project (page 22 of Master Plan) follows the bridging of the gap in the wave barrier where 0 small boats will be entering and exiting after the Phase 11 development. The Phase IR UJ W X development is not planned until 2004. The need to take parking from the current use results in -J �- cn u. an impact to the park. This reasoning is not stated in the formal presented document nor in the W 0 2 � Port Master Plan. It 9 -J, * was also stated verbally that the need to remove the current dedicated park parking was to U. < ) I provide a secure area for boat owners visiting the boat storage and a potential for the owners to Ln a I access their boats to work on them outside of the dry storage facility. In the drawing diagrams, X LU. Z: the design indicates that in the south western comer of the upland project, boats are outside of z �- the facility. This may be a need but it is not stated in the presented documents nor in the J.-O Z �- approved Master Plan. W W If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the vehicle entrance into Marina Beach Park becomes a dead-end. Currently the amount of 0 ;: dedicated parking and the parking configuration allows for vehicle egress out of the park. 0 W LU With the need to eliminate the parking on the north side of the park, the ability for recreational X 11 Y, users to enter Marina Beach Park and then turn around and exit become's impossible. To �L- 0 accommodate the impact the City of Edmonds would need to diminish the park openspace .. z areas to provide for a turn around on the west end of the one row of parking stalls located at Lu cn the northern boundary of the site. If the removal of the dedicated public park parking (22-26 stalls) is justified and needed, the z elin-tination of parking creates an impact on the park. The Port of Edmonds in veribal conversations has stated that they will provide 16 additional parking stalls on the east side of the Boat Storage Facility on the western side of the extension of Admiral Way. They have also stated that they will make up the remaining deficit in the parking areas to the north of the dry boat storage area. It was stated that they would also provide directional signage to provide for the recreational user opportunities to be aware of the parking areas set aside for recreational user visiting Marina Beach Park. lle additional 16 parking stalls are discussed in the presented documents but no indications of additional public park parking use is discussed as provided through the proposal. If the removal of the dedicated public park parking (22-26 stalls) is justified and needed the o elimination of parking creates an impact on the park. An option that could be designed by the Port is ajoint use of the area between the southern boarder of the dry boat storage and the southern edge of the Marina Beach Park city parking stalls. This entire area could be configured to provide forjoint parking use, the entrance and exit lanes could be designed, the public could access the public restroom on the SE comer of the building with ease and the secured gate could be placed between the joint parking lot and the boat owners outside work 0 area. This design concept would provide a greater benefit to the area without adverse stress on the parking needs of the area. A 77, 0 Date: To: Vrom: Subject: 0 14 113 to] VO-T., I e I-_) I " August 6, 1996 Paul Mar, CqWunity Services Director Jeffrey S. Wils?n-, Current Planning Supervisor PORT OF EDMONDS "DRY STACK STORAGE" CHRONOLOGY Chronology of relevant events related to Port of Edmonds development activity, especially the proposed "Dry Stack Storage'facility. Date Issue/Action November 13, 1995 Letter sent to the Port outlining concerns with the Ports compliance with the State Environmental Policy Act. Letter generated as a result of Port taking action on a project and issuing an Environmental Determination without providing the City to comment on the action as required under the Act. April 25, 1996 City staff conducted a pre -application meeting for the Port of Edmonds and their consultants regarding the proposed "Dry Stack Storage" facility. At this time City staff outlined potential issues, including the potential environmental impacts of the project, and discussed the process the Port would need to proceed through to requests permits for the project. Staff included in this meeting: Jeff Wilson, Paul Mar, Jim Walker, Steve Bullock, Rob Chave, Jeannine Graf, Ann Bullis, Sharon Nolan, Gordy Hyde, Don Fiene, Public Works staff, and Fire Dept staff. May 21, 1996 Both Steve Bullock and I met with the Ports consultants on the proposed "Dry Stack Storage' facility, Makers, and outlined concerns regarding the draft environmental checklist the Port had prepared for the proposed "Dry Stack Storage" facility. Concerns related included: traffic, consistency with height regulations, view blockage, parking, consistency with the City's adopted Comprehensive Plan - Downtown/Waterfront Plan. June 13, 1996 Staff (Paul Mar, Jeff Wilson, Steve Bullock, Gordy Hyde & Jeannine Graf) toured the Port of Edmonds site with Bill Toskey, then attended a meeting at the Port of Edmonds with Bill Toskey and the Port's consultants to further discuss the proposed "Dry Stack Storage!' facility. During this time, City staff again stated its concerns with the City of Edmonds ce Planning Division - W POECHMN.M)C Owl& 0 proposed project, questioned the method the Port was going to utilize to process SEPA, offered to work with the Port on resolving Z environmental issues prior to issuance by the Port of an environmental determination, and raised many other issues related to the proposed Lui cc 2: project. D LU L) July 8, 1996, The Port of Edmonds adopts a revised Port Master Plan. It is not -J L) 0 0 apparent of the Port, as required the State Environmental Policy Act U) LU n adopted an environmental determination. If a determination was -J �-i adopted, the Port did not forward a copy to the City as required. If one (n U. 0 was not adopted, the Master Plan may be invalid. July 17, 1996, Planning Division receives written notification from the Port of their .J J <, adoption of a new Master Plan. Prior to this point, the PI i g LJ- (n 31 a Division was not invited to participate in the review or comment on the LU document prior to its adoption. Z July 18, 1996 The Port of Edmonds submits an application for a consolidated permit ;-- 0 Z I-- review of the Port's proposed "Dry Stack Storage" project. Based on LU W, prelin-dnary review, the Port will need to obtain the following permits: Shoreline Substantial Development Permit Shoreline Variance for height in order to allow a 45-foot tall building (max. 35-feet allowed under the State Shoreline Management Act), zoning variance for a 45- LU foot tall building (max, 30-feet allowed), Architectural Design Board review' " Included in the permit application was the environmental ZI determination issued by the Port on July 15th. City had until July 29th, U)l to respond. 0 Z July 22, 1996 1 fhxed a letter to Bill Toskey asking the Port to withdraw and reissue the environmental determination issued on July l5tb, because the determination was not transn-titted to the City until a week later, thus eliminating 1/2 of the 15-day comment period required under State law, July 23, 1996 City received letter from the Port indicating that the determination issuance date had been changed. Preliminary review of the environmental checklist submitted by the Port as part of their application 4 packet has resulted in the following issues and concerns: 0 1 . The environmental determination references the Port revised Master Plan as supporting the proposed project. The "revised" Master Plan, adopted July 8th, has not been adopted by the City as part of our Comprehensive Plan, an environmental determination as required by State law does not appear to have been completed, and if it had, the City had not been notified. 2. Ile environmental checklist submitted with the application references a traffic study that has t 0 not been completed, and would not be completed prior to the end of the 15 day cornment period. Therefore the City does not what potential traffic impacts may be created by the project, and will have not legal opportunity to comment on them. 0 X 3. The only mi6gation requirements adopted by the Port to mitigate the massive scale of the proposed structure (15 feet taller than allowed by code and over 300 linear feet parallel to the z shoreline) is the landscaping and design features of the building. < UX Additionally, I anticipate that upon completion of the review of the environmental checklist by the staff prior to the end of the comment period on August 8th, that several other major issues and -J Ot impacts to the environment will be identified. U) LUI W X City Options _J f-; (n LL —0 LU 1. Assume Lead Agency status. This would require that an Environrnental Impact Statement be prepared to address the impacts of the project and develop alternatives and mitigation U- < measures. This action must be taken by August Sth. (n 0 UJI 2. Ask that the Port withdraw their environmental determination and work with the City to z address our concerns. I honestly do not think that this will resolve or adequately address our Oi z concerns. W LU! D 3. Do nothing. CnI 0 4. Appeal to Superior Court. W LU Attachments ZI ti; W pc: Rob Chave Steve Bullock z 0 t4l' IN"" 7 77, 'k , X �' LLJ cc LLI -i L) 0 U) a U) LU UJ LU LL- 01 LU z �- 0 Z �- LU LU g cl). 0 Ui UJI L) U- 0 z LU U) 0 z za C., VIA FAX (774-7837) AND U.S. MAIL November 13,1995 William Toskey Executive Director Port of Edmonds 336 Admiral Way Edmonds, WA 98020 X Subject: SEPA/SHORELINE PERNET REQUIREIVIENTS FOR PORT PROJECTS Dear W Toskey: I have reviewed your lett er of November 8, 1995, and wanted to respond to a couple of things (see Enclosed). Your letter indicates that the Port has completed a SEPA checklist for some project, and that if the City wishes to review the document, we may request it. I believe this is in violation of State law. The State Environmental Policy Act (SEPA), which provides the ability for certain quasi - public agencies to act as the agency with jurisdiction for the environmental review process and issue their own environmental determination, sets forth very specific requirements 'and obligations under the law. One of the most critical requirements for an agency issuing an environmental determination is to inform and provide copies of the environmental checklist, supporting studies (if any), and the envirom-nental determination to other agencies with jurisdiction and the Department of Ecology.. The City� being the local permitting authority (agency with jurisdiction) for building permits, land use permits, and Shoreline Permits, is an agency that you must provide a copy of all Frivironmental documents and the environmental determination for any project which requires the issuance of a determination. Furthermore, this information must be provided in a timely fashion after issuance of the determination, and with a minimum 15 day comment period (required by law) for all agencies with jurisdiction to review and comment on the project. The City, or any other �gency with jurisdiction, may assume. jurisdiction under SEPA if it does not believe that the enviromnental review process was properly followed by your agency. If the City or other agency does assume jurisdiction pursuant to SEPA, an Environmental Impact Statement is required. The concern here is that the Port has now submitted several projects which fall both under jurisdiction of the SEPA and the Shoreline Management Act, and the Port has only partially VJP0R7J.DW,&AUG-% CORRMAGENCY followed the required procedures for environmental review pursuant to the SEPA. Without the required timely notifications and f ull transn-dttal of documents, the City will be left with no choice but to assume urisdiction and require the completion of an Environmental Impact Statement. z This will have to occur by November 22nd, if the Port does not properly complete the environmental review process as required by SEPA. LU: =r With regards to your request that the City waive the requirement for a Shoreline Substantial LU U� .-J Development Permit. for your most recent proposal to pave an undeveloped area within an area 0! U 0: under shoreline jurisdiction, the City does not have the ability to simply waive the requirement for Cn LW (n a permit unless the project meets one of the specified exemptions provided for under the Shoreline LU -J �-iij Management Act. To the best of my understanding of the proposed project, it does not appear to Cn U. I meet any of the specified exemptions under the Shoreline Management Act. LU 01 When the appropriate permit materials and environmental review documents and determinations are properly submitted to our office in conformance with all applicable local and state regulations, (n 01 the City will consider the permit applications complete, and will initiate processing of said Uiz applications. 1 z 1--, 0 If you have any further questions regarding this matter, 'please do not hesitate to contact me at �i 1--, 771-0223. LU LU L) U)II Sincerely, 0 a ;: i Community Services Department - Planning Division LU LOY Oi Z: Jeffrey S. Wilson, AICP W Cn! Current Planning Supervisor X 0 z Enclosure: November 8, 1995 Letter from Ardliam Toskey pc: File No. ADB-95-130 File No. SM-95-130 File No. ADB-95-157 File No. ADB-95-158 Mayor Hall Scott Snyder, City Attorney Paul Mar, Community Services Director Rob Chave, Planning Manager 0 John Bissell, Associate Planner Kirk Vinish, Planner Ron McConnell, City of Edmonds Hearing Examiner Department of Ecology Department of Ecology - Shorelands Division Port of Edmonds Board of Directors Page 2 Of2 9SPORT_LDOCI&AU0�% CORREVAGENCY . . . . . . . . . . 0 SA; 7 ®r, g? U) LL. 10 LL D TO uj: z 0: Z LU Lu! U); 0- 0 �- LU UJ bi Z! U) z to E Description of proposal: Port of Edmonds Dry Stack Boat Storage Facility, Pedestrian BoardwalldLook-out, adjacent commercial/office addition Proponent: Port of Edmonds Location of proposal, Including street address if any: In southern portion of Port property Lead agency: Port of Edmonds The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement is not required under RCW 4321.030(2)(c). Ibis decision wai made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. X This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days the DNS per WAC from the date below. Comments must be submitted by 15 days after issue of 197-11-340(2)(a). Responsible Official: Bill Toskey Positfonfritle: Executive Director Phone: (206) 774-0549 Address: 336 Admiral Way, Edmonds, WA 98020 Date: Signature: You may appeal this determination to Port of Edmonds Commissioners, 330 Admiral Way, Edmonds, WA 98020, no later than 30 days after issue, by filing a written appeal citing the reasons, per WAC 197-11-680(4)(c). You should be prepared to make specific factual objections. Contact William Toskey or ask about the procedures f6r SEPA appeals. Page I of 7 Mailed to the following along with the Enviromnental Checklist: City of Edmonds 2327034-011-0008 250 5th Avenue N. Union Oil Company Edmonds, WA 98020 P.O. Box 7600 z < �" Los Angeles, CA 90051 x Environmental Review Section Uj; CC Department of Ecology 232703il-057-0009 L4 Q! P. 0. Box 47703 Burlin on Northern Railroad Co. 9t UOI Olympia, WA 98504-7703 777 Main Street Cn U) UJ !I Fort Worth, TX 76102 Washington State Dept of -j t.- I Transportation 2327034-003-0008 Ln U0 TSM&P/Land Developer Harold R. Stone & L. Ardean 15700 Dayton Avenue North 14277 Worden Way Seattle, WA 98133 Saratoga, CA 95070 U- Community Transit 232703-4-013-0006 x UJI Attn: Marvin Freel Margaret B. Vorwick Trust z 1133 164th Street Southwest, #200 clo Brice Inv. Realty 0! 1--� Lynnwood, WA 98037 9450 SW Commerce Circle LU Lui Wilsonville, OR 97070 Burlington Northern Railroad U to, 2900 Bond Trouts Ln. timited 0 Everet� WA 98201 LaiTy Johnson UJ UJ 1212 NE 65th Street X Ly �- p 232703-1-045-004 Seattle, WA 98115-6724 LL 0, ESC Associates z 3131 E. Madison Street, Suiti 102 Seattle, WA 98112 0 z MITIGATING MEASURES INCORPORATED INTO THE PROPOSAL: In order to mitigate the potential impact of the requested height variance for the proposed dry� boat storage shed this proposal contains the mitigation measures. See the following attachments to Page 2 of 7 -'T -7!7-77 V, V "XiN INNI, Z Z U) cc: < LU -J (-)0 V) a U) LU LU -J U) W; LU M�! cc LL < Lij z �- 0 Z �- LLJ LU U) 0 a LLJ LL 0 z LU U) L) y F-, z ME VIA FAX (774-7837) AND U.S. MAIL July 22, 1996 Mr. William Toskey Executive Director Port of Edmonds 336 Admiral Way Edmonds, WA 98020 Subject: ENVIRONMENTAL DETERMINATION FOR CONSOLIDATED PERMIT APPLICATION FOR NEW DRY STACK STORAGE FACILITY AND MARINA IM[PROVENIEWS Dear b&. Toskey: I have just reviewed your new permit application which was submitted in the late afternoon on July 19th, including the environmental determination issued by the Port for the proposed Dry Stack Storage facility and other Marina improvements. I The Port, acting in the role,of lead agency, issued a M[itigated Determination of Nonsignificance on July 15, 1996, with the 15-day comment period expiring on July 29, 1996 (see Enclosed). The actual determination was not delivered to the City of Edmonds until late afternoon (approximately 3:00 PK on Friday July 19th, thus effectively eliminating half of the mandatory review time for other agencies with jurisdiction. The Port, as Lead Agency, is responsible for following the procedural requirements of the State Environmental Policy Act when issuing an Environmental Determination. Specifically, pursuant to WAC 197-11-340(2)(b): "Ae responsible official shall send the DNS and environmental checklist to agencies with jurisdiction, the department of ecoloV, and affected tribes, and each local agency or political subdivision whose public services would be changed as a result of implementation of the proposal, and shall give notice under 197-11-510. " Furthermore, pursuant to WAC 197-11-340(2)(d): "The date of issuefor the DNS is the date the DNS is sent to the deparhnent of ecology and agencies with jurisdiction and is made publicly available. " Additionally� it is unclear when the Port actually sent copies of the M[itigated Determination of Nonsignificance to the other fisted agencies and tribes in order to allow them to comment. Furthermore, based on the list provided on the second page of your detennination letter, it does not appear that the Tulalip Tribe was listed for notification. Therefore, given that the determination was not officially transmitted to the City of Edmonds until July 19th, I am requesting that the Fort, as Lead Agency, provide written %PORT-I.D006-AUGM coRRMAGENCY I rn u-I 0 Uj 2 � LU: z ;7- 0' z J.-: LU Ui: 0 0— LU W m U�I 21 LU U) X 0 z 0 -LY'A - %Jv' 'Luu 12M15'Huc, ly1ftmcnO, bnuln -1 Ower, Second Avenue, Seattle, WA 98104 "Poitr-1.00MAMN CORRWAGENCY Page 2 Oft 0 June 17, 1996 Paul Mar City of Edmonds 250 Fifth Ave N Edmonds, WA 98020 WA Dear Pau This let er is a follow-up to our joint meeting on.7une 13. 1 thank you for your participation and willingness to involve appropriate City staff to assist in a full range of discussions related to the Port's future plans, particularly the stack storage facility. I believe the meeting was very helpful to Port staff and consultants and we will work very hard to meet the City's expectations in the permit application process. Specifically, we will make the following commitments to help move this project along: Consider providing restr oons, for the Marina Beach Park. patrons. Modify the parking in the south Port area to provide designated spaces for Marina Beach patrons sufficient to compensate for the loss of parking on Port property. Provide clear walkway and pedestrian facilities from Marina Beach Park north to Olympic Beach Park. Work with the City staff to prepare vegetation, architectural features, and structural adjustments to mitigate the visual impacts of the facility. Provide additional documentation showing the view impacts from various locations throughout the Edmonds bowl. Continue to develop requirement documentation for the' facility and the impacts of feasible alternatives. Incorporate City building code requirements into the various features of*the complete storage facility. 0 Prepare permits, design documents, and the construction packages in an expeditious manner in order to minimize the impacts during construction. Conduct technical one-on-one meetings with appropriate members of the City staff and ensure that all prepared documents and permits meet the City's expectations. Prepare parking and traffic plans appropriate for the long range known requirements of the Port. Update and revise the Port Master Plan in accordance with the City comprehensive Plan. The Port w.ill'*ta'ke'the-.above actions and all other actions, necesaary th. ansure -the Port staff cind itd con.sultantz ard- working closely with Pity'staff on -this and relait'ed'ptojects. We appreciate the City staffis underdtandin4-of,our'nedd to expedite this project in order to minimize disruptions to the public's use of the community's waterfront facilities. Again, I thank you for your cooperative approach to the Port's permitting issues. We look forward to members of your staff assisting the.Port with early notification of important issues and helping to identify mutually acceptable alternatives. Sincerely, ve Director i��'(2'0"6_) 7-7-4---7837 April 22, 1996 PLANtVjjy6 DEPT. U) LU au; Mr. Paul Mar U) LLI City of Edmonds - Uj O� 250 Fifth Ave N 2�: Edmonds, WA 98020 < 51 Re: E;dmd town Waterfront lilan 0" Cal i LU =:I Dear Mr. Z �_. V_; O� This etter documents the manner in which the Port of Edmonds LU UJI Master Plan and construction program conform to and support the 1994 Edmonds Downtown Waterfront Plan. As you know, the Port rrr 0 participated in the plan development, and our master planning team has made a special effort to implement the plan as it pertains to the Port's property. The attached chart references specific statements in the plan and describes the Port's response 0 to each statement. Z LI! 01 X: I understand that the Downtown Waterfront Plan (DWP) was not specific with regard to the Port area Master Plan because the Z planning team and advisory committee realized that he Port would require design flexibility in preparing a successful Master Plan that supports the DWP. The DWP does envision the Port area to be a keystone in the overall downtown waterfront redevelopment, providing a key pedestrian connection along the shoreline and a mixed -use activity focus that bridges the area between the Point Edwards site and downtown. Consolidating dry boat storage into a more compact footprint and developing the.east side of Admiral Way with waterfront supportive activities will allow us to better implement the DWP 0 goals, provide for*water-dependent uses, and serve local citizens and visitors. Sincerely, 9 LI ! Toskey Ve Director see 0 0 ate 0 DOWNTOWN WATERFRONT PLAN STATEMENT PORT MASTER PLAN RESPONSE 1. Port Improvements to am . key component to the phase me Intensification of activity and esplanade completion will be completed in redevelopment strategy. 'PortAma: upgrade marina and shoreline Phase I time frame. South Marine will be rebuilt. access as par Port Plan.- (Page 3, legand) 2. The plan calls for"consolidating marma"I'lld "'Iffer, . (Page 4 and Dry boat storage will be consolidated into a single structure. map on Palo 1, on .go 3. 'Coordinate circulation and public parking With Poll development." SEPA analysis of proposed development included a tuaffic study. (Page 6. Item 3.) Improved parking at Dayton and SR104 4. Complete public esplanade along waterfront. (Page 8, note on phan.) Esplanade completion will be a Phase I element and will Include an elevated Iewmg platform. 5. Vision statements: uDowintown is extended Westward and connected to the shoreline Marine support buildings extend retail and office uses Into the Port am. by positive mixed -use development as Wall as by cumveruent pedestrian routes. - "The shoreline features a full spectrum of—reational activities, Port developmentwill allow mom efficient land/Water tublimilon and mom park seffings, and marine facilifies.' activities, to Include tour boats, kayaks, and personal "ter""" 'Them!s a mom active and vital setting for new retail office, Increased moorage and boat storage Will bring mom people Into downtown entertainment and associated businesses supported by a nearby area. New buildings expand visitor activities. residents, downtown commercial ..fiWIY and vhiltms from throughout the region.* �The downtown supports a Ix of uses W1 thut ancroaching into New buildings Will not block views from public rlght�l-way or maildences. single fimAi y neighborhoods. Them is some new multi -story development In the existing downtown where residential views am not blocked.- �Opporfimffies for new development and redevelopment which Proposed Impmvements include pedestrian improvements at buildings and rairdbuce Edmonds'attmotive. small town pedeeftlan oriented esplanade. character.' (page 9.) 32X 10 25X 1 6 M! ju 0 in LU _j Cn U. LU 0 _j LL C1 W: X. z z LLI LU 2 D; :D Cl: L) U)' 0 0 z LU (a z K121 Marina Parking EXISTING MASTER PLAN South Basin Auto/Marina 252 340 (354)* Trailer�� 139 100(86) On -Street 32 41 Anthony's Restaurant 82 82 North Basin Auto/Marina 221 221 On -Street 48 40 Marine Services Building N/A 72 774 896 Depending on final layout of trailer spaces 63 trailer spaces temporarily used for dry boat relocation; can be replaced in North Basin Additional Parking Currently Available Boat Trailer Lot with 100 50-200 (Temporary use; off-peak times) Trailers and/or Vehicles Temporary Parking at Future 200-250* (Until construction begins) Marina Service Building Site 260-450 Total Temporary Spaces * Maximum auto spaces; alternative is 75 boat trailer and 100 auto spaces < I.: I Z� UJ Lu 0 Cn a U) LU Ui 3: Ln OU w LL <1 D Lu 3: Z �- l.- 0 Z �- LLJ LU Cn 0—, 0 �- W UJ LL 0 Z LU tn !E 0 Z 4 O'l t 0 0 RT �,4 ALI Volume 6, Number 1, Spring 1996 An indoor dry storage facility, similar to one being planned by the Port. The final planning phase is complete and the Port is preparing to begin construction of a 500-boat indoor dry storage facility. The project, which has been a key part of the Port's long range plan for several years, will be con- structed at the south end of the marina where the existing boat sheds are located. The type of facility being planned is brand new to the Pacific Northwest and will provide a significantly higher level of service than existing dry storage facilities in the area. The estimated cost of the building and support facilities is $4 million and the target completion date is about a year away. In a detailed report, the market research firm of BST Associates stated that demand for such a facility is very high, particularly for vessels in the 24-32 foot range. They said it should reach capacity within two or three years. Port executive director Bill Toskey explained, "With the expanding population in our service area and with no substantive increases in moorage capacity for many years, I believe that the Port of Edmonds has a responsibility to address all options that could increase boating opportunities:" A complete package Besides the building itself, the facility will comprise a new double launcher and staging float, replace- ment and relocation of "A" dock, Commissioners: Dan Prinz, Ben Cain, Don Stay H.wt!171, and a new bulkhead with prom- enade, similar to that constructed four years ago in the north marina. The project also includes parking lots, landscaping, utilities, walk- ways, storage lockers, wash -down facilities, fire alarm and fire control systems, a small Port office, and restroom facilities. In addition, there is an option of adding 10,000 square feet of commercial space at the north end of the building. As with existing moorage at the Port, tenants will be charged according to the size of their boats. A tenant will be able to call in from home, ask to have their boat launched and —by the time they arrive —find it in the water and ready to go. The new facility has been in the planning process for several years. It is the first phase of the recon- struction and renovation of the entire south marina and part of a continued on page 4 e�- < I..:, =Z. �- UJ Cc LIJ 0 U) a U) LU LU LL; 0' U.1 2�1 g:31 Lt <i M z �._ 0 z I— W LU 0-1 a �- LU UJI = U F_ z L Li in 0 z 0.1 t 0 J A 4 Stack Storage continued from page I sequence of events that will eventually increase the Port's moorage capacity by 30 percent. According to Toskey, the Port currently has approximately 320 boats in dry storage spaces. Engineering studies have shown that the existing Boat Loft and storage sheds do not use the Port's land resources efficiently. With the new facility the Port will increase dry storage capacity from 320 to 500 boats and free up 101/, 12% more usable land. In February the Commission decided to move forward with the planning phase. Dry storage for lower maintenance Each current dry moorage tenant will be offered space in the new facility. In addition, Port Comn-ds- sioner Don Stay said that some wet moorage tenants may want to relocate to the new facility to reduce maintenance on their boats.The fully enclosed building will cover approximately the same area as the existing four rows of sheds and will allow all the existing parking to remain. Inside, boats will be stacked four high. Spaces will be provided for tenants to work on their boats. There will be facilities for engine flushing and hull rinsing, a fish cleaning station, restrooms and showers, sewage pump -out stations, storage and locker -rooms and a small meeting room. Rates in the new facility will be a few dollars cheaper across the board than the Port's current covered accommodations. Tenants with boats currently moored or stored out in the open, however, will find the price of being under cover *is somewhat higher than they have been paying. Financially self- supporting Financially, the project is de- signed to be self-supporting. It will be funded with new issue revenue bonds. The only tax money used Will be for features specifically for the general public, mainly the public boardwalk and pedestrian access bridge around the launcher. This will be fully ADA accessible and will allow the public to watch the launching process from an elevated vantage point. In early March the Port held a public meeting with current and prospective tenants of the facility. The various criteria and opera- tional issues were detailed by Port staff. All questions and objections were addressed and, most impor- tantly, the Port and its engineers were able to get direct input from users on design modifications and operational changes.The most intensive period of construction activities will take about four months and will be done in the .off'season. All preliminary work and approvals are expected to be completed by September and the entire project is scheduled to be operational by May 1997. Launch Package Those who regularly use the Port's boat launching facility have an opportunity to save money. A new launch card gives the user six launches for the price of five. Additionally, trailer and vehicle parking —normally two dollars —is free to card holders. The cost of the card, as with individual launches, depends on the length of the boat According to Port marine services manager Dave Howard, the promotion has worked out well during the off season. Not only does it encourage greater use of the Port, but "it allows us to give a special thank you to our regular customers, especially seniors," he said. R, W NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN 0 ag- a A 5z Pa Z2, 'a H. gi F 24 R ail US "79 a a S,F.' a —82 ,VA. - a-4,,4jrZ In ii" E, Ag a 24F CD -3 �H, ag .4, — 56 , . 0 " * & I 8 1, R'S.= , 2 15, Ui, - �� - a a E� Tol H ;8 S 5s 2 '.-- - -a 2, I -A U. �R ,-2 �T WA a. a a :L2 NOTICE: IF THE DOCUMENT IN THIS FRAME IS LESS CLEAR THAN 0— THIS No Hcg IT IS DUE To THE QUALILY OF THE DOCUMEN , T� 9': t 194 IN I E-�- z z z Z Qw FF. A 2, Be Uml 0 �1�1 4, 9 a'R RUe _0 &a a U 6' 9,q 9% 71 4KK rEl 5- a a -ak-A: T 0 E, P Z- UJ L11 -i U 0 (n 0 Cj) LU Lu = -j F- (n LL 0 U-1 CC LL j z 1.- 0 Z I-- LU LU U (j), 0 LU F- LL 0 z LU U) U) :F F-4 z 0.1 C 0 'IJ a] APPLICATION ROUTING FORM FILE: SM 96-95 AND CHECKLIST FROM: PL'ANNINd ROUTED TO: Engineering Fire---- . PubllcV&�,773,11-9-6"� Parks ex Rec. 7/31/96 Staff RIECEIVEU RETURNED AUG U 1 1996 Engineering PURI IC WOH 8 DEPr Fire Public Wo -ks Parks ist Rec 1Y THr-cnAY- A1A1QA 4116 "'Ito *PER WHAT SECTION OF THE CODE.2 *COMMENTS WITHOUT CITATIONS WILY!� �NSIDERE *Additional Information Required for Complete Applicatior *Additional Studies Required to Complete Review • Owner PORT OF EDMONDS • Property Address ADMIRAL -WAY 1 Date of Application 7/19/96 1 Type CONSOLIDATED PERMIT APPLICATION: SHORELINE MGT. PERMI SHORELINE VARIANCE., a VARIANCE Hearing Required:Yes--X— No— Date of Hearing (if known) 2LI 9/96 W X Application _Site Plan for Short Subdivision (8.5 x 11) X Fee X- Site Plan (11 x 17) X APO Ust -___—Segais (Existing & Proposed) Title Report ----Environmental Assessment X Vicinity Map -------Proof of 2-Year occupancy (ADU) X Elevations --.—Declarations (Variance & C. U. P.) .Petition (Official Street Map) --A_Envimnmental Checklist Critical Areas Determination 10 -4. j.- X Z. i— W cc 2 LIJ -j U 0 (n 0 V) LU ELI X F- LL! 0 LU cr. LL. LU z I— 1.- 0 Z F- Uj LU U U) 0-1 a �- LIJ LUI U LL 0 z LU U) z 0 ME E APPLICATION ROUTING FORM FILE: SM-96-95 AND CHECKLIST FROM: PLANNING ROUTED TO: ,.!.Engln�erIng`1 Fire Public Works 7/31196 Parks 8t Rec. 7/31/96 .11Y 3 1 1996 RETURNED LL'.. Public Parks ex Rec. 14444ji,,ji4'r Staff Comments:SEPA CO-MENTS ARE DUE BY TUESDAL Q/ /96 *PER WHAT SECTION OF THE CODE? *COMMENTS WITHOUT CITATIONS WILL NOT CONSIDERED *Additional Information Required for Complete Application *Additional Studies Required to Complete Review e Owner, ORT OF EDMONDS i Property Address, ADMIRAL WAY Date of Application 7/19/96 Type—LQNSOLIDATED PERMIT APPLICATIOMLSHORELINE-MGT. PERMIT. ADB. s Hearing Required:Yes X No— Date of Hearing (if known) 9/19/96 X —Application X Fee x —APO Ust Title Report X —Mcinity Map X —Elevations Petition (Official Street Map) Critical Areas Determination Site Plan for Short Subdivision (8.5 x 11) ­2�—Site Plan (11 x 17) ------j.egals (Existing & Proposed) _Environmental Assessment ----2roof of 2-Year Occupancy (ADU) . . ............... Declarations (Variance & C. U. P.) —L_Environmental Checklist Cn U. LU 0 LL LO X: z 01 z LU W; 2 =)! :D Oi U 0 a LU LUI M L) 0 z LU Lt) 0 z 0 i PE Subject: Consolidated permit application for the Port of EdMMd-$-(SM-96-95) The application has been received by the Engineering Division. It is not possible to ascertain if this is a complete application at this time. We note that Exhibit F referred to in the application is not part of the package we received. I will be unable to have the application fully reviewed by the August 6 deadline. Construction season and scheduled vacation reduce personnel availability. I note the application was submitted on July 18, and it has taken fully two weeks to have it routed to other Divisions for comments. It is unrealistic to expect comments be returned in half the time it took to get the application routed. We expect that comments can be forwarded from the Engineering Division by August 21, 1996. MY OF EDMONW ENGEqEEMG DMIMON SM96095DOC 0, Z. LU LLJ 0 Cn Q in L11 LU -i (n LL 0 W cc Ln a z i­- 1.- 0 Z LU 14.1 0 c) 1­- UJ LU �L- 0 z Uj Cn 0 -± F- 0 z Ir 01 z 0 L01 C`� APPLICATION ROUTING FORM FILE: SM-96-95. AND CHECKLIST FROM: PLANNING ROUTED TO: RETURNED Engineering . 7131/96 Engineering Fl 7/31/96 Fire Public Works-ZL31L26 Public Works Parks ex Rec. 7/31/96 Parks ex Rec Staff Comments:SEPA COMMENTS ARE ESPAL 8/6/96 *PER WHAT SECTION OF THE CODE? *COMMENTS WITHOUT CITATIONS WILL NOT CONSIDERED *Additional Information Required for Complete Application *Additional Studies Required to Complete Review * Owner Property Address ADMIRAL WAY Date of Application 7/19/96 Type —CONSOLIDATED PERMIT APPLICATION: SHORELINE MGM -PERMIT. ADB. * Hearing Required:Yes X No— Date of Hearing (if knciwn)-2LL2L26_ X _Application X Fee X -APO List Tide Report X -Vicinity Map X -Elevations Petition (Official Street Map) Critical Areas Determination _Site Plan for Short Subdivision (8.5 x 11) --��—Site Plan (I I x 17) ­­Legals; (Existing & Proposed) _Environmental Assessment -----2roof of 2-Year Occupancy (ADU) _Declarations (Variance & C. U, P.) --.K_Environmental Checklist <:, S t . 19 9 *) CITY OF EDMONDS 250 STH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works - Planning a Parks and Recreation * Engineering BARBARA FAHEY MAYOR `k I.- � Z- VIA FAX (774-7837) AND U.S. MAIL (n U) UJ LUX Cn LL i 0 July 22, 1996 LL < Mr. William Toskey =)i Executive Director X Lu. Port of Edmonds �- X z F- 336 Admiral Way 1,- 0 Edmonds, WA 98020 Z F- Lu UJ 2 =) :) a U rn Subject: ENVIRONMENTAL DETERMINATION FOR CONSOLIDATED PERMT 0 APPLICATION FOR NEW DRY STACK STORAGE FACILITY AND MARINA 0 Lu IMPROVEMENTS �L- 0 z Dear 1�4r. Toskey: .. uj cn T F- 0 I have just reviewed your new permit ap lication which was submitted in the late afternoon on p z July l9th, including the environmental determination issued by the Port for the proposed Dry Stack Storage facility and other Marina improvements. The Port, acting in the role of lead agency, issued a Mitigated Determination of Nonsignificance on July 15, 1996, with the 15-day comment period expiring on July 29, 1996 (see Enclosed). The actual determination was not delivered to the City of Edmonds until late afternoon (approximately 3:00 PNI) on Friday July 19th, thus effectively eliminating half of the mandatory review time for other agencies with jurisdiction. The Port, as Lead Agency, is responsible for following the procedural requirements of the State 01 Environmental Policy Act when issuing an Environmental Determination. Specifically, pursuant to WAC 197-11-340(2)(b): "Yhe responsible official shall send the DNS and enQi6nmental checklist to agencies with jurisdiction, the department of ecology, and affected tribes, and each local agency or political subdivision whose public services would be changed as a result of implementation of the proposal, and shall give notice under 197-11-510. " Furthermore, pursuant to WAC 197-11-340(2)(d): "The date of issuefor the DNS is the date the DNS is sent to the department of ecology and agencies with jyrisdiction and is made publicly available. " Additionally, it is unclear when the Port actually sent copies of the Mitigaied Determination of Nonsignificance to the other listed agencies and tribes in order to allow them to comment. Furthermore, based on the list provided on the second.page of your determination letter, it does not appear that the Tufalip Tribe was fisted for notification. Therefore, given that the determination was not officially transmitted to the City of Edmonds until July 19th, I am requesting that the Port, as Lead Agency, provide written NPORT�LDOCW-JUL-% Incorporated August 11, 1890 CDRRWAC;ENCY Sister Cities International — Hekinan, Japan 0 clarification that the official date of issuance is July 19th, and the 15-day comment period shall run from that date. Therefore, with the date of issuance being July 19th, the official 15-day comment period does not expire until August 2, 1996, or 15 days after all affected agencies were issued this environmental determination. Your written response should also be z forwarded to all agencies, tribes and parties fisted on the second page of your determination letter. LU;, As the City has not been left with a great deal of time to review and comment on the Mitigated Determination of Nonsignificance issued by the Port of Edmonds, I am requesting that you 0! provide a written response by 4:00 PM on July 23rd to the City's request for an extension to the comment period until Augusi 2nd. LUI If you have any further questions regarding this matter, please do not hesitate to contact me at T UO. LU 771-0223. L, Sincerely, D Cn Community Services Department - Planning Division Lui Xt z j7- z Jeffrey S. Wilson, AICP Current Planning Supervisor U CAI 0 ;7- Enclosures: 1) Mitigated Determination of Nonsignificance issued by the Port of Edmonds 0 on July 15, 1996 LU 2) WAC 197-11-340 U. 0! ZI pc: Vfile No. SM-96-95 LU Uy Mayor Fahey Scott Snyder, City Attorney 0 z Paul Mar, Community Services Director Rob Chave, Planning Manager Department of Ecology Department of Ecology - Shorelands, Division Mr. Gerald Hansmire, NLAKERS, Smith Tower, Second Avenue, Seattle, WA 98104 0 Pap 2 Of2 %POIttI,DOCa2-)UL,96 CORREYAGENCY X 0 LW LU Proponent: Port of Edmonds -J Cn LL LU 0 Location of proposal, including street'address if any: In southern Portion of Port property Lead agency: Port of Edmonds LL D U) The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the UP environment. An environmental impact statement is not required under RCW 43.21.030(2Xc). This decision was :E' I made after review of a completed environmental checklist and other information on file with the lead agency. This z 1.- 0! information is available to the public on request. Z �-'! LU Lui 'S D! There is no comment period for this DNS. 5 Oi 0 0 t —X— This DNS is issued under 197-11-340(2); the lead agency will not act on this -proposal for 15 days UJ LU from the date below. 'Comments must be submitted by 15 days after issue of the DNS per WAC X U", 197-11--340(2)(a). �- 1-i 0!� zi Responsible Official: Bill Toskey di (A[ Position/Title: Executive Director z Phone: (206) 774-0549 Address: 336 Admiral Way, Edmonds, WA 98020 Date: L Signature: You may appeal this determination to Port of Edmonds Commissioners, 330 Admiral Way, Edmonds, WA 98020, no later than 30 days after issue, by filing a written appeal*citing the reasons, per WAC 197-11-680(4)(c). . V 11 You should be prepared to make specific. factual objections. Contact William Toskey or ask about the procedures for S.EPA appeals. KII] P89e I of 7 Z* LU cr 0 Cn a U) LU UJ 3: _J F-. Cn LLi 0 LU LL z �_ 0 Z I— LU LU n cn, 0— a p UJ �L_ 0 z tn ZF 0 1 z E E 0 SEPA Rules Part Three-197-11-350 (i) Adversely affect environmentally sensitive or spe- cial areas, such as loss or destruction of historic, scien- tific, and cultural resources, parks, prime farmlands, wetlands, wild and scenic rivers, or wilderness; (ii) Adversely affect endangered or threatened species or their habitat; (iii) Conflict with local, state, or federal laws or re- quirements for the protection of the environment; and (iv) Establish a precedent for future actions with sig- nificant effects, involves unique and unknown risks to the environment, or may affect public health or safety. (4) If after following 197-11-080 and 197-11-335 the lead agency reasonably believes that a proposal may have a significant adverse impact, an EIS is required. (5) A threshold determination shall not balance whether the beneficial aspects of a proposal outweigh its adverse impacts, but rather, shall consider whether a proposal has any probable significant adverse environ- mental impacts under the rules stated in this section. For example, proposals designed to improve the environment, such as sewage treatment plants or pollution control re- quirements, may also have significant adverse environ- mental impacts. WAC 197-11-335 Additional information. The lead agency shall make its threshold determination based upon information reasonably sufficient to evaluate the environmental impact of a proposal (197-11-055(2) and 197-11-060(3)). The lead agency may take one or more of the following actions if, after reviewing the checklist, the agency concludes that there is insufficient informa- tion to make its threshold determination: (1) Require an applicant to submit more information on subjects in the checklist; (2) Make its own further study, including physical in- vestigations on a proposed site; (3) Consult with other agencies, requesting informa- tion on the proposal's potential impacts which lie within the other agencies' jurisdiction or expertise (agencies shall respond in accordance with 197-11-550); or (4) Decide that all or part of the action or its impacts are not sufficiently definite to -.allow environmental analysis and commit to timely, subsequent environmen- tal analysis, consistent with 197-11-055 through 197- 11-070. WAC 197-11-340 Determination of nonsignificance (DNS). (1) If the responsible official determines there will be no probable significant adverse environmental impacts from a proposal, the lead agency shall prepare and issue a determination of nonsignificance (DNS) substantially in the form provided in 197-11-970. If an agency adopts another environmental document in sup�- port of a threshold determination (Part Six), the notice of adoption (197-11-965) and the DNS shall be com- bined or attached to each other. (2) When a DNS is issued for any of the proposals listed in (2)(a), the requirements in this subsection shall be met. (a) An agency shall not act upon a proposal for fif- teen days after the date of issuance of a DNS if the proposal involves: (i) Another agency with jurisdiction; (ii) Demolition of any structure or facility not ex- empted by 197-11-800(2)(f) or 197-11-880; (iii) Issuance of clearing or grading permits not ex- empted in.Part Nine of these rules; or (iv) A DNS under 197-11-350(2), 197-11-350(3) or 197-11-360(4). (b) The responsible official shall send the DNS and environmental checklist to agencies with jurisdiction, the department of ecology, and affected tribes, and each lo- cal agency or political'subdivision whose public services would be changed as a result of implementation of the proposal, and shall give notice under 197-11-510. (c) Any person, affected tribe, or agency may submit comments to the lead agency within fifteen days of the date of issuance of the DNS. (d) The date of issue for the DNS is the date the DNS is sent to the department of ecology and agencies with jurisdiction and is made publicly available. (e) An agency with jurisdiction may assume lead agency status only within this fifteen -day period (197- 11-948). (f) The responsible official shall reconsider the DNS based on timely comments and may retain or modify the DNS or, if 'the responsible official determines that sig- nificant adverse'impacts are likely, withdraw the DNS or supporting documents. When a DNS is modified, the lead agency shall send the modified DNS to agencies with jurisdiction. (3)(a) The lead agency shall withdraw a DNS if. (i) There are substantial changes to a proposal so that the proposal is likely to have significant adverse envi- ronmental impacts; (ii) There is significant new information indicating, or on, a proposal's probable significant adverse environ- mental impacts; or (iii) The DNS was procured by misrepresentation or lack of material disclosure; if such DNS resulted from the actions of an applicant, any subsequent environmen- tal checklist on the proposal shall be prepared directly by the lead agency or its consultant at the expense of the applicant. (b) Subsection (3)(a)(ii) shall not apply when a non- exempt license has been issued on a private project. (c) If the lead agency withdraws a DNS, the agency shall make a new threshold determination and notify other agencies with jurisdiction of the withdrawal and new threshold determination. If a DS is issued, each agency with jurisdiction shall commence action to sus- pend, modify, or revoke any approvals until the neces- sary environmental review has occurred (see also 197- 11-070). WAC, 197-11-350 Mtigated DNS. The purpose of this section is to allow clarifications or changes to a pro- posal prior to making the threshold determination. [CL 197-11 WAC--P 71 0 LL Uj 3: z �- �- 0 Z �- LLI LU 0- 0 t: LU LL LL c LU 0 z 01 t 0 -rc:l: OAXE -rF%^NSMI-rrer>:L--C NUMBr=R or- PAcass---,C-- (Including <�-over Page) lROCAPIOnts 'relechopier Number: FAOSIMILM ^UtornatIc/oroup It (2.3 mIna.); (Br=up III FROM: �_Jsotft If there are any problem& cluring tronsmisolc>n c:)r V-1nat, rn�. claournento are receKeoO 1!�ocn, lete.eloose call 1200)-P-71-0 20 and asK Sonder'% -relecQpler Numben (208) 771-0221 Re. -c- F—=r pt�A Sister C' itlom Internarinool Hakinan. Japan ------------ TRANSMISSION REPORT THIS DOCUMENT (REDUCED SAMPLE ABOVE) WAS SENT ** COUNT # 6 *** SEND *** NO REMOTE STATION I.D. START TIME DURATION #PAGES COMMENT '1 97747837 7-22-98, 3;15PM y) LL LU 0 2 � C2 L, L.0 z I-- �- 0 Z �- W LU LU LL F- LL C LU L) 0 z 0 Sender's Telecopier Number: (206) 771-0221 RE: S' G Oft:kev- th tt%-6.-kaz, -Gy- V!x dm DADkWorddatakFaxForm- *. Incorporated August 11, 1890 * Sister Cities International — Hekinan, Japan 4�' St. 1 89\) CITY OF EDMONDS BARBARA FAHEY 250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT Public Works 9 Planning 0 Parks and Recreation * Engineering --k I.- , Z� LU cc VIA FAX (774-7837) 0 a AND U.S. MAIL U) UJ uJ -J Cn U. July 22, 1996 LU 0 LL < Mr. William Toskey Executive Director LU Port of Edmonds z I- 336 Admiral Way l.- 0 Edmonds, WA 98020 Z �- Lu LU 2 =) :) 0 U tn. Subject: ENVIRONNffiNTAL DETERMINATION FOR CONSOLIDATED PERMIT 0—� APPLICATION FOR NEW DRY STACK STORAGE FACILITY AND MARINA a k= t EvIPROVENMNTS LU Lu� , U- 0 z Dear Mr. Toskey: Lu (n I have just reviewed your new permit application which was submitted in the late afternoon on 0 July l9th, including the environmental determination issued by the Port for the proposed Dry Stack Storage facility and other Marina improvements. The Port, acting in the role of lead agency, issued a Mitigated Determination of Nonsigrilficance on July 15, 1996, with the 15-day comment period expiring on July 29, 1996 (see Enclosed). The actual determination was not delivered to the City of Edmonds until late afternoon (approximately 3:00 PM) on Friday July 19th, thus effectively eliminating half of the mandatory review time for other agencies with jurisdiction. The Port, as Lead Agency, is responsible for following the procedural requirements of the State Environmental Policy Act when issuing an Environmental Determination. Specifically, pursuant 0 to WAC 197-11-340(2)(b): "7he responsible official shall send the DNS and environmental checklist to agencies with jurisdiction, the department of ecology, and affected tribes, and each local agency or political subdivision whose public services would be changed as a result of implementation of the proposal, and shall give notice under 197-11-510. " Furthermore, pursuant to WAC 197-11-340(2)(d): "Yhe date of issuefor the DNS is the date the DNS is sent 'on he de a inien e ' g" a� a enc 'es wi h and is made publicly available. g ar e Port actually sent copies of the Mtigated Determination of to p r 0 co t when fi an r I t I the isted agencies and nbes in order to allow them to comment. Ad on Uy is e " a ' t u c' s 0 Nonsi I c ce to tie 0 F urt or s lis s co p 0 herm e ba ed on the rovided on the e nd age of your determination letter, it does Ot pp t t th Tul lip T p ar n s list f n a e ha e a be wa ed or notification. Therefore, given that the determination was not officially transmitted to the City of Edmonds until July 19th, I am requesting that the Port, as Lead Agency, provide written %PORT - I.Doco-JuEm 0 Incorporated August 11, 1890 * CORP"AG&VCY Sister Cities International — Hekinan, Japan j, clarification that the official date of issuance is July 19th, and the 15-day comment period shall run from that date. Therefore, with the date of issuance being July 19th, the official 15-day comment period does not expire until August 2, 1996, or 15 days after all affected agencies were issued this environmental determination. Your written response should also be z forwarded to all agencies, tribes and parties listed on the second page of your determination letter. LUUj;; cc 2� As the City has not been left with a great deal of time to review and comment on the Mitigated Determination of Nonsignificance issued by the Port of Edmonds, I am requesting that you L4 U� U 0: provide a written response by 4:00 PM on July 23rd to the City's request for an extension to the Cn all .11 comment period until August 2nd. CD LUI LU 3:1 -i �-i If you have any further questions regarding this matter, please do not hesitate to contact me at Cn U.1 �U- 771-0223. :3 Sincerely, U- Community Services Department - Planning Division uj� z P! JeffTey S. Wilson, AICP W; Current Planning Supervisor 0! Enclosures: 1) Mitigated Determination of Nonsignificance issued by the Port of Edmonds 0 t= on July 15, 1996 LU D X 2). WAC 197-11-340 ILL 0! z! pe: File No. SM-96-95 Mayor Fahey PE Scott Snyder, City Attorney 0 z Paul Mar, Community Services Director Rob Chave, PI ng Manager Department of Ecology Departme of Ecology - Shorelands Division Mr Geral annsmire, MAKERS, Smith Tower, Second Avenue, Seattle, WA 98104 A N, 0 Ste Psp 2 of 2 (a U-1 LU 01 2�� g :3 LL Ln 0, LU z 1--: Lu UJ' U U) 0;7-1 a— Ui UJI U- 0 z Lu Cn 0 z RE rullk-A kir 3M ADMIRAL WAY, EDMONDS, WA M20 J U L 19 1996 RCW 197-11-970 Determination of Nonsignificance (DNS) MITIGATED DETERMINATION OF NONSIGNIFICANCE Description of proposal: Port of Edmonds Dry Stack Boat Storage Facility� Pedestrian Boardwalk/Look-out, adjacent commercial/office addition Proponent: Port of Edmonds Location of proposal, including street address if any: In southern portion of Port property Lead agency: Port of Edmonds The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. I There is no comment period for this DNS X This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by 15 days after issue of the DNS per WAC 197-11-340(2)(a). Responsible Official: Bill Toskey Position/Title: Executive Director Phone: (206) 774-0549 Address: 336 Admiral Way, Edmonds, WA 98020 Date: Ir Signature: You may appeal this determination to Port of Edmonds Commissioners, 330 Admiral Way, Edmonds, WA 98020, no later than 30 days after issue, by filing a written appeal *citing the reasons, per WAC 197-11-680(4Xc). You should be prepared to make specific factual objections. Contact William Toskey or ask about the procedures for SEPA appeals. V5020NS.00C - NISM Page I of 7 z X Cl) — U) LU Uj (j) LL L —0 U LL M T) X z LU LU L) cr, 0— U. 2 LU U F z 01 Mailed to the following along with the Environmental Checklist: City of Edmonds 2327034-011-0008 250 5th Avenue N. Union Oil Company Edmonds, WA 98020 P.O. Box 7600 Los Angeles, CA 90051 Environmental Review Section Department of Ecology 232703-1-057-0009 P. 0. Box 47703 Burlington Northern Railroad Co. Olympia, WA 98504-7703 777 Main Street Fort Worth, TX 76102 Washington State Dept of Transportation 2327034-003-0008 TSM&P/Land Developer Harold R. Stone & L. Ardean 15700 Dayton Avenue North 14277 Worden Way Seattle, WA 98133 Saratoga, CA 95070 Community Transit 2327034-013-0006 Attn: Marvin Freel Margaret B. Vorwick Trust 1133 164th Street Southwest� 9200 do Brice inv. Realty Lynnwood, WA 98037 9450 SW Commerce Circle Wilsonville, OR 97070 Burlington Northern Railroad 2900 Bond Trouts Ln. Limited Everett, WA 98201 Larry Johnson 1212 NE 65th Street 232703-1-045-004 Seattle, WA 98115-6724 ESC Associates 3131 E. Madison Street� Suite 202 Seattle, WA 98112 MITIGATING MEASURES INCORPORATED INTO THE PROPOSAL: In order to mitigate the potential impact of the requested height variance for the proposed dry boat storage shed this proposal contains the mitigation measures. See the following attachments 9602ONSDOC-7115M Page 2 of 7 X z UJ 0 cn 0 U) LU LU _J LL; -0, LU LL 31 D 0 x L, �- -F z Z LU LU n 0 0 a LU 3: !i- 0 z LU in 0 z E t 0 SEPA Rules Part Three-197-11-350 (i) Adversely affect environmentally sensitive or spe- cial areas, such as loss or destruction of historic, scien- tific, and cultural resources, parks, prime farmlands, wetlands, wild and scenic rivers, or wilderness; (ii) Adversely affect endangered or threatened species or their habitat; (iii) Conflict with local, state, or federal laws or re- quirements for the protection of the environment; and (iv) Establish a precedent for future actions with sig- nificant effects, involves unique and unknown risks to the environment, or may affect public health or safety. (4) If after following 197-11-080 and 197-11-335 the lead agency reasonably believes that a proposal may have a significant adverse impact, an EIS is required. (5) A threshold determination shall not balance whether the beneficial aspects of a proposal outweigh its adverse impacts, but rather, shall consider whether a proposal has any probable significant adverse environ- mental impacts under the rules stated in this section. For example, proposals designed to improve the envir ' onment, such as sewage treatment plants or pollution control re- quirements, may also have significant adverse environ- mental impacts. WAC 197-11-335 Additional information. The lead agency shall make its threshold determination based upon information reasonably sufficient to evaluate the environmental impact of a proposal (197-11-055(2) and 197-11-060(3)). The lead agency may take one or more of the following actions if, after reviewing the checklist, the agency concludes that there is insufficient informa- tion to make its threshold determination: (1) Require an applicant to submit more information on subjects in the checklist; (2) Make its own further study, including physical in- vestigations on a proposed site; (3) Consult with other agencies, requesting informa- tion on the proposal's potential impacts which lie within the other agencies' jurisdiction or expertise (agencies shall respond in accordance with 197-11-550); or (4) Decide that all or part of the action or its impacts are not sufficiently definite to -.allow environmental analysis and commit to timely, subsequent cnvironmen- tal analysis, consistent with 197-11-055 through 197- 11-070. WAC 197-11-340 Determination of nousignificance (DNS). (1) If the responsible official determines there will be no probable significant adverse environmental impacts from a proposal, the lead agency shall prepare and issue a determination of nonsignificance (DNS) substantially in the form provided in 197-11-970. If an agency adopts another environmental document in sup- port of a threshold determination (Part Six), the notice of adoption (197-11-965) and the DNS shall be com- bined or attached to each other. (2) When a DNS is issued for any of the proposals listed in (2)(a), the requirements in this subsection shall be met. (a) An agency shall not act upon a proposal for fif- teen days after the date of issuance of a DNS if the proposal involves: (i) Another agency with jurisdiction; (ii) Demolition of any structure or facility not ex- empted by 197-11-800(2)(f) or 197-11-880; (iii) Issuance of clearing or grading permits not ex- empted inPart Nine of these rules; or Ov) A DNS under 197-11-350(2), 197-11-350(3) or 197-11-360(4). (b) The responsible official shall send the DNS and environmental checklist to agencies with jurisdiction, the department of ecology, and affected tribes, and each lo- cal agency or political* subdivision whose public services would be changed as a result of implementation of the proposal, and shall give notice under 197-11-5 10. (c) Any person, affected tribe, or agency may submit comments to the lead agency within fifteen days of the date of issuance of the DNS. (d) The date of issue for the PNS is the date the DNS is sent to the department of ecology and agencies with jurisdiction and is made publicly available. (e) An agency with jurisdiction may assume lead agency status only within this fifteen -day period (197- 11-948). (f) The responsible official shall reconsider the DNS based on timely comments and may retain or modify the DNS or, if the responsible official determines that sig- nificant adverse*impacts are likely, withdraw the DNS or supporting documents. When a DNS is modified, the lead agency shall send the modified DNS to agencies with jurisdiction. (3)(a) The lead agency shall withdraw a DNS if- (i) There are substantial changes to a proposal so that the proposal is likely to have significant adverse envi- ronmental impacts; (ii) There is significant new information indicating, or on, a proposal's probable significant adverse environ- mental impacts; or (iii) The DNS was procured by misrepresentation or lack of material disclosure; if such DNS resulted from the actions of an applicant, any subsequent environmen- tal checklist on the proposal shall be prepared directly by the lead agency or its consultant at the expense of the applicant. (b) Subsection (3)(a)(ii) shall not apply when a non- exempt license has been issued on a private project. (c) If the lead agency withdraws a DNS, the agency shall make a new threshold determination and notify other agencies with jurisdiction of the withdrawal and new threshold determination. If a DS is issued, each agency with jurisdiction shall commence action to sus- pend, modify, or revoke any approvals until the neces- sary environmental review has occurred (see also 197- 11-070). WAC. 197-11-350 Mitigated DNS. The purpose of this section is to allow clarifications or changes to a pro- posal prior to making the threshold determination. JCL 197-11 WAC--p 71 8, 1996. A copy of this letter will be included in the agency packages. Please contact Geralyn Sander if you have any questions. I will be out of town until July 29,1996. E 0 tA 0 N D S =6 AOMMAL WAY ZDf40NDS.WASWaMNWM0-i'214 1206)774-0549 PAX(2061774-Mr JUL 2 1996 VIA FAX 771-0221 UePT. AND US. MAIL July 22,1996 Jeffrey S. Wilson, AICP City ofEdmonds Planning Department 250 56 Ave N EdMonds. WA 99020 w Subjoin: ENVIFtONMENTAL DrsTMADTATION FORL C014SOLMATED PERMU AppLCIATION FOR NEW DRY STACK STORAGE FACnxrY AND MARINA MPOVEhIENTS -% 11 e ! Dav Mr, Wilson: ZI This letter responds to your July 22, 1996 fax. As Geralyn Sander discussed m4th you by phone on July 22, we experienced technical difficulties in putting together the DNS and 0 enviromnental checklist packages for both the City of Fdmonds and dioibution to z 4800016e. We delivered the CiWs paekaSe late on July 19, agency packages willbe sent overnight express on Tuesday afternoon, July 23, to include Tulalip, Tribes. Therefbre� the officW date of issuance -will be July 24, and the 15-day comment pexiod will expire August 8, 1996. A copy of this letter will be included in the agency packages. Pleaw contact Geralyn Sander ifyou have any questions. I will be out of town until July 29,1996, sincerdy, 0, tfi, T 0 Executive Director TOTAL P.01 0 =PORT OF RECEIVED E D M 0 H D S 336 ADMIRAL WAY JUN 17 19% EDMONDS. WASHINGTON98020-7214 r-XICES (206) 774-0549 FAX (206) 774-7837 June 17, 1996 Paul Mar city of Edmonds 250 Fifth Ave N Edmonds, WAI 98020 Dear Pau This let er is a follow-up to our joint meeting on June 13. 1 thank you for your participation and willingness to involve appropriate City staff to assist in a full range of discussions related to the Port's future plans, particularly the stack storage facility. I believe the meeting was very helpful to Port staff and consultants and we will work very hard to meet the City's expectations in the permit application process. Specifically, we will make the following commitments to help move this project along: • Consider providing restrooms for the Marina Beach Park. patrons. • Modify the parking in the south Port area to provide designated spaces for Marina Beach patrons sufficient to compensate for the loss of parking on Port property. • Provide clear walkway and pedestrian facilities from Marina Beach Park north to Olympic Beach Park. • Work with the City staff to prepare vegetation, architectural features, and structural adjustments to mitigate the visual impacts of the facility. • Provide additional documentation showing the view impacts from various locations throughout the Edmonds bowl. • Continue to develop requirement documentation for the* facility and the impacts of feasible alternatives. • Incorporate City building code requirements into the various features of the complete storage facility. 0, C31, Z < X Z: �_ Lg O� Lu.. LU (n LL 0 UJ LL < 31 UJr Z O� LU W� L) (I)i 0 0 W LU LL Z! MI 0 Z T-7 0 the impacts during construction. Conduct technical one-on-one meetings with appropriate members of the City staff and ensure that all prepared documents and permits meet the City's expectations. Prepare parking and traffic plans appropriate for the long range known requirements of the Port. Update and revise the Port Master Plan in accordance with the City comprehensive Plan. The Port will'take the -.above actions and all other actions, necest;ary td. Onsure -the Port staff cind itb consultants ara* - working closely with City'staff on -this and related*ptojects. We appreciate the City staff's underdtanding-of.our need to expedite this project in order to minimize disruptions to the public's use of the community's waterfront facilities. Again, I thank you for your cooperative approach to the Port's permitting issues. We look forward to members of your staff assisting the Port with early notification of important issues and helping to identify mutually acceptable alternatives. �-%. 'Toskey ve Director 0 z 11 LLJ' LiJ U _J 0 U) LU LLJ (n LL LU CC <U_ Ln X LLI z 0 � I­ LU LU 0-1 a �- LLI LUI z UJ U) z to Auquat 7, 1996 William M. Tookey Executive Director Port, of Edmonds 336 admiral way Edmonds, WA 98020 Subject- Proposed ( checklist Dear Mr. Toskey. As a member of the would,like to comn I stacked storage facility aRPA environmental )nds Laebugten Chapter of Trout Unlimited, T on several items in your sEPA checklist; Section 3. water ( ) (1) - The wetland you refer to as "name unknown" is the Edmomds/union Oil Marsh, and the stream connecting the wetland eo Pu Sound is Willow Creek or Shellabarger Creek (City of Edmonds o . ehensive Plan Draft EIS, May 1995 . Your statement that "neither the stream culvert nor *the wetland area axe disturbed by this project" does not appear to be consistent with tha plans you are presenting. it is my understanding that t e project is going to be constructed either on top of or adjacent to the stream culvert. The plan should aKpropriately show the exact location of the culvert, in light of t a possibility that during the onstruction period heavy equipment or grading coul ause tal portion of the culvert to collavae. Section 3. water (2). ' "Will the project require any work over, in$ or adjacent to (with:'n 200 feet) of the described waters? if yes, please describe and attach available plans. n No mention is made of the stream here --a s�gnificant omission. Section 5. Animals ( ) . 11 ... any birds and animals which have been observed on or near the site or are known to be on or near the site.ff Coho salmon, chum salmon, and searun cutthroat are not on your list. These are also significant omissions. During the last three years, coho almon have been returning to this area in increasing numbers. Last year, over 80 adult coho salmon made the journey through the culvert off the beach up to and through the marsh to reach Willow Creek. Several chum salmon were counted in this group. Since vre know that. many fish did not make it across r 0 FROM t2*-622-6398 T (7) 2067710221 199re-07 11136 #Sse P.03 William Tookey August 7, 1996 Page 2 the march, we know that a much larger number passed through the z < marina area. = zJ F_ ul CC 2 section 3. Animals (c). "is the site part of a migration route?n < :) if adult spawning a mon and searun cutthroat are swimming under i LU 0 _J 01 your proposed facility, I would have to disagree with your "non U 0, answer. W U LU, W _J As noted In the Draft Environmental impact statement for the Cn LL Comprehensive Plant :!Or the City of 5dmonds, "The marine habitat, W01 both Intertidal and djacent open water, is important to migrating waterf low and other u ater birds, sea lions, and ealmouids and other fish species.,, This would include both the chum and cobo salmon, LL < =)I as well as the searun cutthroat --a Washington priority fish. 0, moreover, many speci2s of waterfowl are commonly sighted in this Lu. X area. I personally of a sighting of a marbled murlette in the boat harbor as recently as July 20, 1996. z Section S. Animals (d). "Proposed measures to preserve or enhance W LU wildlife." I do not understand your response that such measures are "not applicable. Given the plethora oir wildlife currently 0 living and reproducirg in the marsh and stream, a preservation plan 0 is not only applicable but necessary. W 9ur concerns about --his proposed facility are centered on the �L_ 0 impact--bQth near- d long -term --that this project will have on z the Edmonds/Union 01 Marsh and the outfall of this wetland. To LU 0) UY preserve and enhance wildlife, we propose.daylighting the outfall 15 �- at this time. Becaus 3 habitat restoration is vital to the recovery z of salmon runs, and 5almon fishers are an important part of Port activity, the Port would also benefit. :Ef the outfall is left culverted, and if th intermodal terminal is built in conjunction with the relocatio f the ferry, the outfall from the marsh would be boxed in with ven little chance of ever coming to daylight, to the long-term detriment of the health of the wetland and intertidal area. Tt would be a tragic loss if the Port builds a storage facility at the cost of damagi an irreplaceable resource. While the environmental checklist is a guide to assure this does not happen, it is useful only if the questions are seriously and thoughtfully 0 addressed. Your cur gory and incomplete answers raise disturbing questions about the Port's commitment to the City's comprehensive I plan and to the pr servation of our area a priceless natural resources. i Very truly yours W CLae-"_ Walter R. Thompson 0 MAILBOXESE= q16 NE 65th Seatde, WA 98115 Date: To: Pax No From: Z/"— Phone No: # of Pages ncluding Message: 77219 e 3 this sheet): - V Ise 12! 444.-1 A'd Copy Service a Fun 3ervice mauvox= INVrary Fax Service v Complete Packing & Buslneu Printing Shipping Servicei Office Supplies # Mailing Services No -Limit Shipping'" * Etc... 01994 NIIIII BQX2& Etc! PO�'T'AL, Bia�INJ.-B AND Cog 916 NE 65th. Seattle, %Va;hIngton 98115 Tel 206 522-9752 Fax 206 522-5398 .%N j,4*4r-AHV9HTLV OWNtU " . p OFIRATtD FRANCHM X Z. I-- LU X _J (-)0' LU LU _J (n LL 01 LL <I 0 UJ 3: Z I'_ 1.- 0 Z I­ U.1 LLI L) Cn C) LLI UJI X L) F- r- LL 0 Z UJ (1) 0 Z M Stephen E. Beck, Jr. 520 Alder Street Edmonds, WA 98020-3414 (206)771-1234 August 6, 1996 Mr. Bill Toskey Executive Director Port of Edmonds 336 Admiral Way Edmonds, WA 98020 RE: Land Use Application; Dry Stack Storage Facility Dear Mr. Toskey: RECEIVED AUG - 9 1996 COMMUNITY SERVICES DIRECTOR I have recently become aware and have been able to obtain a copy of subject application to the City of Edmonds. I am concerned with some of the material contained in this document. My concerns pertain specifically to those matters relating to Aesthetics and Water as contained in the Environmental Checklist and the Exhibits contained therein.. I wish to express my concerns as to the aesthetics of this project, first. The photographs con- tained on Page 6 of the Mtigated Determination of Nonsignificance and Page 19 of Exhibit ##D11, as well as the artists line drawing on Page 9 of the same exhibit, were taken from a position di - redly in front of my residence located on Alder Street between 5th and 6th Avenues South. My present view of the Port of Edmonds includes the piling structure which comprises the 2-Hoist launch facility for dry storage tenants. I estimate this structure to 201 in height. The height of the proposed structure is projected to be 45, over two times the height of the present structure, and of a closed, warehouse -type construction, This would significantly affect the view of the water- front and Puget Sound, for not only myself, but also for 2000-3000 other residents of thePort District. Comparison of this structure to that of a petroleum storage facility is not a valid com- parison. A petroleum tank would probably be 69-80'in width and.of cylindrical configuration and represent less than 3000 sq.ft. of view incursion. The proposed Dry Stack Facility, on the other hand, would create an Eastern wall profile of 320X45, or over 14,000 sq.ft. of flat surface, plus the roof areas, of view blockage. Shielding the structure with 441 trees would only add to the mass of the project. The City of Edmonds adopted the 30'height restriction many years ago to insure that the magnificent vistas offered in the Citys natural bowl setting can be enjoyed by the maximum number of its citizens. I feel these codes should be respected. Secondly, I have concerns as to the quality of the work done by your consultants in preparing this application. In the SEPA Check List, under Article 3. WATER, a. Surface (1); the wetland whose "name unknown" is known the Edmonds/UNOCAL Afirsh and the consultants could have most likely found this out by touring the interpretive trail located on the east side of the r The Edmonds/UNOCAL Marsh has been identified as a Category I wetland and designated as a wildlife sanctuary. Extreme care should be exercised in any development plan by the Port. Wet- lands enhancement was also cited as a goal in the Edmonds DownlownlWater ront Plan, 1995, J the formulation of which, the Port was a participant. I understand that through the restoration ef- forts of the local Chapter of Trout Unlimited; an annual run of salmon has been re-established. These efforts must be considered as well. Thank you for considering my concerns. Sincerely, 'e�u— �- J'�� Steplien E. Beck, r. CC: Paul Mar, City of Edmonds 4 0 ac -4. 1.- X Z. LLJ cc LU L) -i U 0 (n 0, C/) LU LU LL LU 0, < DI 5! LLJ Z �- 0 Z I- LU ui 0 LU Lul X L) 1-- �- LL 0 Z ui U) 0 Z 0 ME CITY OF EDMONDS. BARBARA FAHE I Y MAYOR 505 BELL STREET - EDMONDS, WA 98020 - (206) 771-0247 FAX 1206) 771-0252 OFFICE OF THE MAYOR ��s t . 18 () %J July 23, 1996 Louis and Dorothy Kribs P.O. Box 246 Edmonds, WA 98020 0246 COP4. RE: PORT OF EDMONDS PROPOSED BOAT STORAGE BUILDING Dear Mr. and Mrs. Kribs: I am writing you in response to your letter regarding height limitations in Edmonds and assume you are referring to the boat storage building proposed by the Port of Edmonds. if not, I apologize. Nevertheless, as the following would apply to any person desiring to build over the current height limits, I would like to clarify the regulatory process in the Port project and the way the City operates in its role as the review agency. Anyone can make a request for a variance regarding restrictions currently in place in the City's land development codes. There are clearly defined criteria that establish the basis on which a variance can be granted. I have enclosed copies of the criteria for your reference. The Port, like any other entity, can pursue this course of action. I The decision to grant a variance to City codes is made by the Heating Examiner based on meeting the criteria. A public hearing is always held and citizens can give testimony as to why the criteria have not been met or why the variance should not be granted. Once the Hearing Examiner has made his decision, anyone who participated in the process� including the applicant, can appeal the decision to the City Council. In this case, if the Examiner denied the variance, the Port could appeal and would become the appellant. If the Examiner granted the variance, anyone who was opposed and participated could appeal the decision. During the course of the appeal, the City Council would hold a public hearing on the record established by the Hearing Examiner. At the close of the heating the Council would issue a decision on the appeal. At this time, the Port has just submitted the environmental determination and permit application documents, including variance requests. The first step in the process is for the City, as well as all other affected agencies, to review this information and to communicate their concerns. 0 Incorporated August 11, 1890 9 Sister Cities International — Hekinan, Japan t r Letter to Louis & Dorothy Kribs August 6, 1996 Page 2 I would encourage you to contact the Port directly with'Your concerns. I can also assure you the z City will notify you when hearings related to this matter are scheduled. At this time, the City 3m: I- cannot express an opinion on the Port project as it might create conflicts during any appeal Cr. process. 01 01 th nth arifi 1 hope this gives you an understanding of esituation. Ifyouneedanyfi er cl cation, LU please feel free to contact me. Ln U. C> Sincerely, -J LL < W. Barbara Fahey Z �-i Mayor Z L=U BFIdm (nil 0 CI Enclosure LU LU X U I-- — c: City Council U. 8! .. Z11 - Community Services Director UJ Planning Manager 0 z WinWmW"%WbdBW9 0 W'. 77 �:0 Z LU U) LLJ LL. LLJ _j U. < D LU Z �_ 0 Z �- LU LU 0- 0 �_ LIJ Lu LL 0 Z LU (n 0 Z to 51 city of edmonds -development information Variance A variance is a method by which citizens are granted modifications from the strict application of specific provisions of Chapters 16 and 17, and other sections where specifically stated in the Community Development Code due to a hardship beyond the control of the applicant. Variances do not permit property to be used in a manner other than provided in the Community Development Code. This process is intended to review situations where uniform zoning application would unduly burden one property more than the other properties in the area. Criteria The Hearing Examiner has authority to grant a variance, where practical difficulties, unnecessary hardship, or situations inconsistent with the general purpose of the Community Development Code might result from the strict application of certain provisions. Variances may -be authorized when literal and strict interpretation would cause undue or unnecessary hardship. A hardship is not a problem that you create yourself. For instance, if you build your house in such a manner that you cannot expand the living room without encroaching on a required side yard, you have created that situation. Hardship speaks to whether you would be deprived of property rights common to the general vjcinity and zone. NO VARIANCE MAY BE APPROVED UNLESS ALL OF THE FOLLOWING FINDINGS CAN BE MADE: 1. Special Circumstances. That, because of special circumstances relating to the property, the strict enforcement of the zoning ordinance would deprive the owner of use rights and privileges permitted to other properties in the vicinity with the same zoning. Special circumstances include the size, shape, topography, location or surroundings of the property, public necessity as to public structures and uses and environmental factors such as vegetation, streams, ponds and wildlife habitats. Special circumstances should not be predicated upon any factor personal to the owner such as age or disability, extra expense which may be necessary to comply with the zoning ordinance, the ability to secure.a scenic view, the ability to make more profitable use of the property, nor any factor resulting from the action of the owner or any past owner of the same property. 2. Special Privilege. That the approval of the variance would not be a grant of special pri'vilege to the property in comparison with the limitations upon other properties in the vicinity with the same zoning. 3. Comprehensive Plan. That the approval of the variance will be consistent with e ComprehensT—ve Plan. M Jv" ii�,. < Z- UJ Cc LLJ 0 U) LU UJ -J W LL UJ 0� U- < BI TOT 3: Z �- �- 0 Z �- Lu W (J) 0 lul LL Z LU (n 0 Z 9" Cli 4. Zoning Ordinance. That the approval of the variance will be consistent with i—he purposes of the zoning ordinance and the zone district in which the property is located. S. Not Detrimental. That the variance as approved or conditionally approved will not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone. 6. Minimum Variance. That the approved variance is the minimum necessary to allow the owner the rights enjoyed by other properties in the vicinity with the same zoning. Application Procedure 1. Prepare and submit an application for a variance. The Planning Division has the forms and will assist you with * a�y —additional information needed. Your application must include the following: a. Completed application form. b. The names and addresses of owners as shown on the records of the Snohomish County Assessor and street addresses of property within 300 feet of any point of the subject property. C. Filing fee of $132.00 for applications in RS zone (single family residential) or single family home wherever located; $264.00 for all others. d. Depending on the nature of the variance requested, the Planning Division may require additional information such as a site plan or building elevation. 2. Public Hearing. You will be assigned and notified of a hearing date as soon as the hpplica is determined to be complete. Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thursdays of each month unless otherwise noted, in the *Plaza Meeting Room, Library Building, 650 Main Street, Edmonds, and are open to the public. A maximum of five applications are scheduled per meeting. You or your representative must - appear at the hearing so the Hearing Examiner can ask questions concerning your application. Should you or your representative be unable to attend the meeting, ?r if you wish to withdraw your application, please notify the Planning Division in writing at least four days before the meeting. 3. Final Action. The Hearing Examiner issues a decision ten working days following t nclusion of the hearing. This decision will be final unless a written appeal is filed with the Planning Director within ten working days after the decision is rendered. The appeal will be heard by the City Council. 4. Time Limit., The approved variance must be acted on by the owner within one year from the date of approval or the variance will expire and be null and void, unless the owner files an application for an extension of only one (1) year 30 days before the expiration date and the City approves the application. 5. Location. A variance applies only to the property for which it has been approved and may not be transferred to any other property. VARIANCE/BROCHURE 11192 V I 0 I 1-: �, APPLICANT DECLARATIONS =Zl �- LU In order for the Hearing Examiner to approve a variance request, all of the LU following criteria must be met. It is the applicant's responsibility to show that -J 0 0 all of the criteria are satisfied. Therefore, the following questions have been LU, LU created to assist the applicant in providing applicable information. LU 0 It is important to make your answers clear and direct. Yes/no type answers are discouraged. Please answer all questions on a separate sheet. LL < Please type or clearly print your answers. T) :C UJ z �- 0 Z �- LU UJ 1. How does the proposal meet the Special Circumstance Criteria? What 2 :D :D a special circumstances such as lot size, shape, topography, stream U Cn 0— location, wetland location, or other unusual problems are causing an a LJ LU LU impact which would require a variance? 3: u� �- F- 0 2. Explain why the proposal is not a Grant of Special Privilege. Is the z LU U) proposal something that is allowed to other property owners in the U T �- �-J vicinity, but would be disallowed on your property if the variance is 0 z denied? 3. Explain how the proposal is consistent with the Comprehensive Plan. (Ask a Planner for the Comprehensive Plan Designation for your property.) 4. Explain how the proposal is congtant with the purposes of the Zoning Ordinance and with the Zone district in which the property is located. 01 5. Explain how this proposal meets the criteria of Not Detriment"al. Will the portion of your proposal for which you seek a variance cause a loss of property value, scenic view, or use of surrounding properties? Will the portion of the project for which you seek a variance be physically injurious or harmful to any person on your property or surrounding 0 properties? 6. Explain how the proposed variance is the Minimum Variance needed to accommodate the proposed project, or why there is no alternative other than a variance in order to complete this project. L.WRARYMARDECDOC z Z4 LU Cr LIJ _J (n UJI U) U3 LL LIJ 01 2 � C2 _J� LL. z Z LU Ui g cn� 0 P a LU F_ U_ 0 z LLI (J) z t 0 city of edmonds development information zw'�w Shoreline Management Permit A Shoreline permit is required for any type of improvement on property adjacent to or within 2001 of the shorelines of Puget Sound or Lake Ballinger which exceeds $2,500 in fair market value for labor and materials, or materially interferes with public access to publicly owned shorelines. Single family dwellings are excluded from this requirement unless they are speculative in nature. Site excavation for a single-family resident which exceeds 250 cubic yards must obtain a Shoreline Substantial Development permit. Shoreline permits are subject to review by the Hearing Examiner and the State of Washington. The review process for a Shoreline permit may take at least 6 months from the date of a complete application until final approval by the state. Criteria Shoreline permit applications are subject to review under the criteria contained in the City of Edmonds Shoreline Master Program. Application Procedure i. Prepare and submit an application for a shoreline permit. Your ,application must include the following: a. Completed and signed application form. b. Environmental Checklist. c. Environmental Assessment. d. Filing fee of $422.00'plus the actual cost of legal advertisements. e. The names and addresses of owners as shown on the records of the Snohomish County Assessor and street addresses of property within 300 feet of any point of the subject property. f. Legal description of subject property. h. Five copies of a vicinity map, no larger than 1111 x 1711, indicating relationship of the site to adjacent lands and the uses to which they are put for at least 400 feet in all directions from the project site. i. Five copies of a site plan no larger than 1111 x 1711, drawn to scale, showing: IL L 0 '73 r--qm 10 IN, LFA U) — U) UJ' LU to LL LLJ 04 LL SI 9) a t4i Z �- 0 Z �- 0- 0 P1 LU U11 0 Z UJ en Z t 0 (1) Site boundary and dimensions in vicinity of project. (2) Land contours using 5-foot intervals or cross sections. if project includes grading, filling, or other alteration of contours, then either: (i) Indicate existing and proposed contours and items (3) through (8) below; OR (ii) Provide two cross sections, one showing existing ground elevations and height of structures, the second showing proposed ground elevations and height of proposed structures, with both showing (4) below. (3) Size and location of existing improvements which will be retained. (4) Ordinary high water mark. (5) Size and location of proposed structures. (6) Maximum height of proposed structures above existing grade level. (7) Type and amount of proposed fill. (8) Proposed utilities. 2. Hearing Examiner Review. You will be assigned and notified of a hearing date as soon as the application is determined to be complete. Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thursdays of each month, unless otherwise noted, in the Plaza Meeting Room, Library Building, 650 Main Street, Edmonds, and are open to the public. A maximum of five applications are scheduled per meeting. You or your representative must appear at the hearing so the Hearing Examiner can ask questions concerning your application. Should you or your representative be unable to attend the meeting, or if you wish to withdraw your application, please notify the Planning Division in writing at least four days before the meeting. The Hearing Examiner isues his decision ten working days following the conclusion of the hearing. His decision will be final unless a written appeal, stating reasons, is filed with the Planning Director within ten working days after the date the decision is rendered. Appeals will be heard by the City Council. 3. Filing With The State. The Community Development Director will file copies of the following with the Department of Ecology and the Attorney General within eight days of the final City action on a shoreline permit: I a. Decision. The final decision of the City on the permit, and the permit if it was approved. 0 (n -1 rj) Uji ul M: -j �-! 0) LL. ui LL a UJ z LU LU Ck 0- a �- LU LLI 0 z ui 0 z ( G U) U. LIJ 0 U. T) a :c LLJ �- 3: z �- �- 0 Z �- LU uj U 0— C3 !: LU LL c LU cl L) 3 81- z no Dear Barb: Reference: Proposed change to allow the Port Of Edmonds to increase building height to forty five feet for a boat storage building. I am appalled the City of Edmonds may alter or abandon existing building height limitations in order to accommodate the Edmonds Port District. Having a storage building exceeding height limits and blocking views, just to accommodate storage for pleasure boat owners is indeed an ill conceived idea. Since when do the citizens of Edmonds have to suffer the loss of the panoramic view so unique to this city to provide dead storage in the Port District7 Those of us who live within the Port District are taxed to support the District Once a change Is made we will find a solid wall of apartments and condominiums lining the waterfront area. Let the Port abide by the rules as they now exist and reject their request. Raising the height to forty five feet would be the forerunner to other changes in our City's Comprehensive Plan. Send the message to the Port that they must abide by the existing regulations as everyone else is required to do. They should be setting an example as good neighbors for all Edmonds citizens, not advocates for a privileged few that want to store a boat. Many of us are not in favor of altering or changing the height limitations for any reason. It is requested that you as Mayor and members of the C4 Council hold fast to existing regulations on the present height limitation. ncerely, Ji King,,,- 713 Laurel Street Edmonds, WA 98020-4027 (206) 770 0856 -J. I.- :c Z F- Q: LM -J U 0 U) 0 Cn LU Lu -J Cl) U. LLI LL Cl) LU Z I-- 0 Z I-- U.1 Lu U (n 0- 0 �- UJ Lu C Z L Li Cr 0 Z �*Z to CITY OF EDMONDS CIVIC CENTER - EDMONDS, WA 98020 - f206) 771-0247 - FAX (206) 771-0252 OFFICE OF THE MAYOR --ANN=- 9 0 . I o July 23, 1996 Am King 713 Laurel Street Edmonds, WA 98020 4027 RE: PORT OF EDMONDS PROPOSED BOAT STORAGE BUIELDMG Dear Mr. King: BARBARA FAHEY MAYOR I am writing you in response to your letter regarding the boat storage building proposed by the Port of Edmonds. I feel there needs to be some clarification regarding the regulatory process and the way the City operates in its role as the review agency. Anyone can make a request for a variance regarding restrictions currently in place in the City's land development codes. There are clearly defined criteria that establish the basis on which a variance can be granted. I have enclosed copies of the criteria for your reference. The Port, like any other entity, can pursue this course of action. The decision to grant a variance to City codes is made by the Hearing Examiner based on meeting the criteria. A public hearing is always held and citizens can give testimony as to why the criteria have not been met or why the variance should not be granted. Once the Hearing Examiner has made his decision, anyone who participated in the process, including the applicant, can appeal the decision to the City Council. In this case, if the Examiner denied the variance, the Port could appeal and would become the appellant. Fthe Examiner granted the variance, anyone who was opposed and participated could appeal the decision. During the course of the appeal, the City Council would hold a public hearing on the record established by the Hearing Examiner. At the close of the hearing, the Council would issue a decision on the appeal. At this time, the Port has just submitted the environmental determination and permit application documents, including variance requests. The first step in the process is for the City, as well as all other affected agencies, to review this information and to communicate their concerns. In reviewing your letter, I believe you do have some misinformation regarding this project. I would encourage you to contact the Port directly with your concerns. I have forwarded your letter to the Port. * Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan M ia Ete city of edmonds development information MZ4 UJ UO W a Variance Cn CUM LU, �_ A variance is a method by which citizens are granted modifications from the strict _j U)U.1' 0: application of specific provisions of Chapters 16 and 17, and other sections where LU specifically stated in the Community Development Code due to a hardship beyond the control of the applicant. Variances do not permit property to be used in a manner < d other than provided in the Community Development Code. This process is intended to L.L MI review situations where uniform zoning application would unduly burden one property Ln =Lu� a I more than the other properties in the area. �- 3: Z �- Criteria �_ Z 0 I— LULU 2 = The Hearing Examiner has authority to grant a variance where practical difficulties, unnecessary hardship, or situations inconsistent with the general purpose of the ,0 Community Development Code might result from the strict application of certain 0 provisions. LU = Uj� U; Variances may -be authorized when literal and strict interpretation would cause undue LL 0 Z or unnecessary hardship. A hardship is not a problem that you create yourself. For LU U) instance, if you build your house in such a manner that you cannot expand the living Fc room without encroaching on a required side yard, you have created that situation. 0 Hardship speaks to whether you would be deprived of property rights common to the Z general vicinity and zone. NO VARIANCE MAY BE APPROVED UNLESS ALL OF THE FOLLOWING FINDINGS CAN BE MADE: 1. Special Circumstances. That, because of special circumstances relating to the property, the striFt enforcement of the zoning ordinance would deprive the owner of use rights and privileges permitted to other properties in the vicinity with the same zoning. 41 Special circumstances include the size, shape, topography, location or 0 surroundings of the property, public necessity as to public structures and uses and environmental factors such as vegetation, streams, ponds and wildlife habitats. Special circumstances should not be predicated upon any factor personal to the owner such as age or disability, extra expense which may be necessary to comply with the zoning ordinance, the ability to secure a scenic view, the ability to 0 make more profitable use of the property, nor any factor resulting from the action of the owner or any past owner of the same property. 2. Special Privilege. That the approval of the variance would not be a grant of special prif�viege to the property in comparison with the limitations upon other properties in the vicinity with the same zoning. 3. Comprehensive Plan. That the approval of the variance will be consistent with the Comprehi"n-sive Plan. to ' ' ` ' ' "^ ill with Zoning ordinance.` ^hat~~ -the approval of -- variance�—-'be consistent - , n property the purposes ot the zoning ordinance and the zone district iwhich th�' is located. 5. ' l Not Detrimental. That the variance as approved or conditionally approved not be significantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone. 6. Minimum Variance. That the approved variance is the minimum necessary to allow owner the rights enjoyed by other properties in the vicinity with the same 8pplication Procedure 1. Prepare and submit an a plication for a variance. The Planning Division has the forms and will assist you with. any additional information needed. Your application must include the following: a. Completed application form. b. The names and addresses of owners as shown on the records of the Snohomish County Assessor and street addresses of property within 300 feet of any point of the subject property. C. Filing fee of $132.00 for app lications in RS zone (single family residential) or single family home wherever located; $264.00 for all others. d. Depending on the nature of the variance requested, the Planning Division may require additional information such as a site plan or building elevation. 2. Public Hearing. You will be assigned and notified of a hearing date as soon as the application is determined to be complete. Hearing Examiner meetings are held at 9;00 a,m' on the first and third Thursdays of each month unless otherwise noted, in the Plaza Meeting Room, Library Building, GSO Main Street, Edmonds, and are open to the public. A maximum of five applications are scheduled per meeting. You or your representative must appear at the hearing so the Hearing Examiner can ash questions concerning your application.Should you or your representative be unable to attend the meeting, or if you wish to withdraw your application, please notify the Planning Division in writing at least four days before the meeting. 3~ Final Action. The Hearing Examiner issues a decision ten working days conclusion of the hearing' This decision will be final unless a following�~'` ~- written appeal is filed with the Planning Director within ten working days after the decision is rendered. The appeal will be heard by the City Council. 4 ' The approved variance must be acted on by the owner within one �~~, be null and void" d~of approval or the variance will expire and ^~~' ''~~ the �- 30 unless the owner files an application r for an extension of only one (1) year days before the expiration date and the City approves the application. 5. Location. A variance applies only to the property for which it has been and may not be transferred to any other property. VARIANCE/BROCHURE 11/92 0 VARIANCE Z.J < �) APPLICANT DECLARATIONS Z LU In order for the Hearing Examiner to approve a variance request, all of the LU following criteria must be met. It is the applicant's responsibility to show that all ofthe criteria are satisfied. Therefore, the following questions have been (D U uj. created to assist the applicant in providing applicable information. W (n 0 It is important to make your answers clear and direct. Yes/no type answers are W discouraged. Please answer all questions on a separate sheet. C? U- < Please type or clearly print your answers. LU: z I-- �- 0 Z 1-- 1. How does the proposal meet the Special Circumstance Criteria? What UJ LU special circumstances such as lot size, shape, topography, stream U cn, 0 location, wetland location, or other unusual problems are causing an :-U impact which would require a variance? LU 2. Explain why the proposal is not a Grant of Special Privilege. Is the Z:: a; proposal something that is allowed to other property owners in the vicinity, but would be disallowed on your property if the variance is 0 z denied? 3. Explain how the proposal is consistent with the Comprehensive Plan. (Ask a Planner for the Comprehensive Plan Designation for your property.) 4. Explain how the proposal is congtant with the purposes of the Zoning Ordinance and with the Zone district in which the property is located. 0 5. Explain how this proposal meets the criteria of Not Detrimental. Will the portion of your proposal for which you seek a variance cause a loss of property value, scenic view, or use of surrounding properties? Will the portion of the project for which you seek a variance be physically injurious or harmful to any person on your property or surrounding properties? 6. Explain how the proposed variance is the Minimum Variance needed to accommodate the proposed project, or why there is no alternative other than a variance in order to complete this project L-=M1A^VMDEC.D0C 1��, LJ 5". 0 _J (n Lu� W X:, LU _J Ln UO- Ln 01 LU: Z z LIJ LU cn, W LU LL 0 z LU (n 0 z ME city of edmonds development information Shoreline Management Permit L A Shoreline permit is required for any type of improvement on property adjacent to or within 2001 of the shorelines of Puget Sound or Lake Ballinger which exceeds $2,500 in fair market value for labor and materials, or materially interferes with public access to publicly owned shorelines. Single family dwellings are excluded from this requirement unless they are speculative in nature. Site excavation for a single-family resident which exceeds 250 cubic yards must obtain a Shoreline Substantial Development permit. Shoreline permits are subject to review by the Hearing Examiner and the State of Washington. The review process for a Shoreline permit may take at least 6 months from the date of a complete application until final approval by the state. Criteria Shoreline permit applications are subject to review under the criteria contained in the City of Edmonds Shoreline Master Prog�am. Application Procedure 1 1 Preeare and submit an application for a shoreline permit. Your application must include the following: a. Completed and signed application form. b. Environmental Checklist. c. Environmental Assessment. d. Filing fee of $422.00 plus the actual cost of legal advertisements. e. The names and addresses of owners as shown on the records of the Snohomish County Assessor and street addresses of property within 300 feet of any point of the subject property. f. Legal description of subject property. h. Five copies of a vicinity map, no larger than 1111 x 1711, indicating relationship of the site to adjacent lands and the uses to which they are put for at least 400 feet in all directions from the project site. i. Five copies of a site plan no larger than 1111 x 1711, drawn to scale, showing: 0 I-- Z LU 0 a U) LL 0 LLJ cc LL <I U) F- Z Z UJ W, L) cn UJ W F- Li- 0 Z LU (J) U ZF �7 0 Z (a (1) Site boundary and dimensions in vicinity of project. (2) Land contours using 5-foot intervals or cross sections. if project includes grading, filling, or other alteration of contours, then either: (i) Indicate existing and proposed contours and items (3) through (8) below; OR (ii) Provide two cross sections, one showing existing ground elevations and height of structures, the second showing proposed ground elevations and height of proposed structures, with both showing (4) below. (3) Size and location of existing improvements which will be retained. (4) Ordinary high water mark. (5) Size and location of proposed structures. (6) Maximum height of proposed structures above existing grade level. (7) Type and amount of proposed fill. (8) Proposed utilities. 2. Hearing Examiner Review. you will be assigned and notified of a hearing Ua-te as soon as the application is determined to be complete. Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thursdays of each month, unless otherwise noted, in the Plaza Meeting Room, Library Building, 650 Main Street, Edmonds, and are open to the public. A maximum of five applicatio ' ns are scheduled per meeting. You or your representative must appear at the hearing so the Hearing Examiner can ask questions concerning your application. Should you or your representative be unable to attend the meeting, or if you wish to withdraw your application, please notify the Planning Division in writing at least four days before the meeting. The Hearing Examiner isues his decision ten working days following the conclusion of the hearing. His decision will be final unless a written appeal, stating reasons, is filed with the Planning Director within ten working days after the date the decision is rendered. Appeals will be heard by the City Council. 3. Filing With The State. The Community Development Director will file copies of the foll?­wing with the Department of Ecology and the Attorney General within, eight days of the final City action on a shoreline permit: a. Decision. The final decision of the City on the permit, and the permit if it was approved. t 0 _J 6� U) UJI LU —1 U) UL� ZJ 0 LL C) LU Z 0 LU LU cl) 0- 0 �— LU Ui LL Z LU tn 0 Z to �V, b. Application. The application form, site plan and vicinity map c. Environmental Data. The environmental checklist, threshold determination, and the declaration of nonsignificance or the environmental impact statement. In lieu of this material, a summarization of the actions and dates of actions on environmental data may be filed. d— Notice. The affidavits of notice. 4. Effective Date. No construction authorized by an approved shoreline permit may begin until 30 days after Department of Ecology and Attorney General have completed their review of the documents specified in #3 above. Note: This information should not be used as a substitute for City codes and regulations. You should review all the details of your project with the Planning Division at 250 Fifth Avenue North (771-0220) between 9:00 a.m. and 5:00 p.m. Monday through Friday. SHORLINE/BROCHURE 111-92 X RECEIVED To: Mr. Al Hooper, Executive Editor July 21,1996 The Edmonds Paper .11) L 2 2 1996 550 Main Street #B OFFICE OF THE MAyOR Edmonds, Wa 98020 LUUJ Dear Mr. Hooper, LU -j U 0 cn 0, The Edmonds Paper, dated June 26 to July 9, 1996 contained an article on rn W: Ui page nine about the Port of Edmonds commissioners desire to exceed the height -j W LL limitations by fifteen feet to construct a new boat storage facility. Ui 0 g =i - Two primary quotations in the article were by Port Director Bill Toskey " because open space is in this by LL <i :) sparse area, and we can use every inch" , and Port President Dan Prinz "thinks Ln Cc$ who it might be time for the Edmonds City Council to reevaluate the X LU �- :r, existing policy governing height limitations." Z If we accept Bill Toskey's suggestion that space is tight, we should start erecting Ui Uj, five to ten story apartments, condominiums, office towers and the like. That would solve his problem of using our space to the most effective use. Dan Prinz's comment 0 underlines the theory that if rules and regulations prohibit us from doing what we want, a L— LU Lu then obviously we need to change them. The last thing we need is a boat storage U facility that flaunts and violates the building codes that make Edmonds an attractive �L- 0: place to live and do business in. Z: Lu rn, Developers have invested millions in building facilities for condominiums and 0 Z retail businesses, and have kept these structures within the city height limitations. It would have been much more economical for them to build higher buildings on the same real estate, but they honored the restrictions and resisted from clamoring for deviations to the height regulations. Property owners have also invested many millions, (collectively) in purchasing properties such as homes, apartments and condominiums, in the Edmonds area on the premise that existing height restrictions would be enforced, and with the assurance that water front or territorial views would not be blocked by buildings erected some day that were higher than the codes existing when they bought. 0 I strongly urge the Port Commissioners to rethink their current philosophy, and build iomething within existing codes. I further urge the Mayor of Edmonds and the City Council to put a stop to any violation of existing building codes, which when enforced, protect the large investments made by developers and property owners. t 0 Arthur H. Lowell 200 2nd. Ave. N. #302 774-7250 IWA 0 I F =Z- 1-- UJ cc 2 M U 0 En (3 U) UJI LU U) LLI 01 LL < Z �i R LU W L) cn 0-1 0 1,- L.0 LUI LL 0 Z ul (n :F 0 Z O'l M CITY OF EDMONDS BARBARA FAHEY MAYOR CIVIC CENTER - EDMONDS, WA 98020 - (206) 771-0247 FAX 1206) 771-0252 OFFICE OF THE MAYOR 9 0 9 q Q� July 23, 1996 Arthur H. Lowell 200 2nd Avenue North #302 Edmonds, WA 98020 RE: PORT OF EDMONDS PROPOSED BOAT STORAGE BUILDING Dear Mr. Lowell: I am writing you in response to your letter to the Edmonds Paper regarding the boat storage building proposed by the Port of Edmonds. I feet there needs to be some clarification regarding the regulatory process and the way the City operates in its role as the review agency. Anyone can make a request for a variance regarding restrictions currently in place in the City's land development codes. There are clearly defined criteria that establish the basis on which a variance can be granted. I have enclosed copies of the criteria for your reference. The Port, like any other entity, can pursue this course of action. The decision to grant a variance to City codes is made by the Hearing Examiner based on meeting the criteria. A public hearing is always held and citizens can give testimony as to why the criteria have not been met or why the variance should not be granted. Once the Hearing Examiner has made his decision, anyone who participated in the process, including the applicant, can appeal the decision to the City Council. In this case, if the Examiner denied the variance, the Port could appeal and would become the appellant. If the Examiner granted the variance, anyone who was opposed and participated could appeal the decision. During the course of the appeal, the City Council would hold a public hearing on the record established by the Hearing Examiner. At the close of the hearing, the Council would issue a decision on the appeal. At this time, the Port has just submitted the environmental determination and permit. application documents, including variance requests. The first step in the process is for the City, as well as all other affected agencies, to review this information and to communicate their concerns. I would encourage you to contact the Port directly with your concerns. I have forwarded your letter to the Port. Incorporated August 11, 1890 0 Siste:Cities International — Hekinan, Japan a A =Z- �- UJ cl: 2 0 U) a L#) LU LU (1) LL 0 W LL Di Ln a, U, Z �- 0 Z �-- LU Uj (J) 0-1 C3 �- LU Lul X U �- r- �L- 0 Z Uj LI) 0 Z 10 ME city of edmonds development information Variance A variance is a method by which citizens are granted modifications from the strict application of specific provisions of Chapters 16 and 17, and other sections where specifically stated in the Community Development Code due to a hardship beyond the control of the applicant. Variances do not permit property to be used in a manner other than provided in the Community Development Code. This process is intended to review situations where uniform zoning application would unduly burden one property more than the other properties in the area. Criteria The Hearing Examiner has authority to grant a variance where practical difficulties, unnecessary hardship, or situations inconsistent with the general purpose of the Community Development Code might result from the strict application of certain provisions. Variances may 'be authorized when literal and strict interpretation would cause undue or unnecessary hardship. A hardship is not a problem that you create yourself. For instance, if you build your house in such a manner that you cannot expand the living room without encroaching on a required side yard, you have created that situation. Hardship speaks to whether you would be deprived of property rights common to the general vicinity and zone. NO VARIANCE MAY BE APPROVED UNLESS ALL OF THE FOLLOWING FINDINGS CAN BE MADE: 1. Special Circumstances. That, because of special circumstances relating to the property, the strict enforcement of the zoning ordinance would deprive the owner of use rights and privileges permitted to other properties in the vicinity with the same zoning. Special circumstances include the size, shape, topography, location or surroundings of the property, public necessity as to public structures and uses and environmental factors such as vegetation, streams, ponds. and wildlife habitats. Special circumstances should not be predicated upon any factor personal to the owner such as age or disability, extra expense which may be necessary to comply with the zoning ordinance, the ability to secure a scenic view, the ability to make more profitable use of the property, nor any factor resulting from the action of the owner or any past owner of the same property. 2. Special Privilege. That the approval of the variance would not be a grant of special privilege to the property in comparison with the limitations upon other properties in the vicinity with the same zoning. 3. Comprehensive Plan. That the approval of the variance will be consistent with e Comprehensi've Plan. .4. X �- LU, cc UJ L) -J 0 (j) LU Lu 3: -J �- LA. 0 LLI 2 �J 9 J! LL < 31 0 X LLJ �- 3: Z F- �- 0 Z F- LIJ LU M, L) 0 a LU Lul 3: L) �- 1= LL 0 Z LU (n 0 Z na 4. Zoning ordinance. That the approval of the variance will be consistent with e purposes of the zoning ordinance and the zone district in which the property is located. 5. Not Detrimental. That the variance as approved or conditionally approved will not be signif cantly detrimental to the public health, safety and welfare or injurious to the property or improvements in the vicinity and same zone. 6. Minimum Variance. That the approved variance is the minimum necessary to allow the owner the rights enjoyed by other properties in the vicinity with the same zoning. Application Procedure 1. Prepare and submit an application for a variance. The Planning Division has the forms and will assist you with any adVitional information needed. Your application must include the following: a. Completed application form. b. The names and addresses of owners as shown on the records of the Snohomish County Assessor and street addresses of property within 300 feet of any point of the subject property. C. Filing fee of $132.00 for applications in RS zone (single family residential) or single family home wherever located; $264.00 for all others. d. Depending on the nature of the variance requested, the Planning Division may require additional information such as a site plan or building elevation. 2. Public Hearing. You will be assigned and notified of a hearing date as soon as e applicatioF is determined to be complete. Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thu*rsdays of each month unless otherwise noted, in the Plaza Meeting Room, Library Building, 650 Main Street, Edmonds, and are open to the public. A maximum of five applications are scheduled per meeting. You or your representative must appear at the hearing so the Hearing Examiner can ask questions concerning your application. Should you or your representative be unable to attend the meeting, ?r if you wish to withdraw your application, please notify the Planning Division in writing at least four days before the meeting. 3. Final Action. The - Hearing Examiner issues a decision ten working days following -the conclusion of the hearing. This decision will be final unless a written appeal is filed with the Planning Director within ten working days after the decision is rendered. The appeal will be heard by the City Council. 4. Time Limit. The approved variance must be acted on by the owner within one year from the date of approval or the variance will expire and be null and void, unless the owner files an application for an extension of only one (1) year 30 days before the expiration date and the City approves the application. 5. Location. A variance applies only to the property for which it has been appFo-ved and may not be transferred to any other property. VARIANCE/BROCHURE 11/92 0 VARIANCE zjt < APPLICANT DECLARATIONS X z LU cc In order for the Hearing Examiner to approve a variance request, all of the J 0 following criteria must be met. It is the applicant's responsibility to show that U a all of the criteria are satisfied. Therefore, the following questions have been U) (n LU Lu 3: created to assist the applicant in providing applicable information. -J �-,J Ln to- 1, w It is important to make your answers clear and direct. Yes/no type answers are Z. �:[ discouraged. Please answer all questions on a separate sheet. g ti" LL <� (n BI Please type or clearly print your answers. LU z �- 0 Z �- LU LU 1. How does the proposal meet the Special Circumstance Criteria? What 2 =), special circumstances such as lot size, shape, topography, stream 0;: location, wetland location, or other unusual problems are causing an W impact which would require a variance? U- 0 2. Explain why the proposal is not a Grant of Special Privilege. Is the z w cn proposal something that is allowed to other property owners in the T vicinity, but would be disallowed on your property if the variance is 01' z denied? 3. Explain how the proposal is consistent with the Comprehensive Plan. (Ask a Planner for the Comprehensive Plan Designation for your property.) 4. Explain how the proposal is congtant,�ith the purposes of the Zoning Ordinance and with the Zone district in which the property is located. 0 5. Explain how this proposal meets the criteria of Not Detrimental. Will the portion of your proposal for which you seek a variance cause a loss of property value, scenic view, or use of surrounding properties? Will the portion of the project for which you seek a variance be physically injurious or harmful to any person on your property or surrounding properties? 6. Explain how the proposed variance is the Minimurn Variance needed to accommodate the proposed project, or why there is no alternative other than a variance in order to complete this projea LALIBRARYMARDECDOC t city of edmonds development information Shoreline Management Permit A Shoreline permit is required for any type of improvement on property adjacent to or within 2001 of the shorelines of Puget Sound or Lake Ballinger which exceeds $2,500 in fair market value for labor and materials, or materially interferes with public access to publicly owned shorelines. Single family dwellings are excluded from this requirement unless they are speculative in nature. Site excavation for a single-family resident which exceeds 250 cubic yards must obtain a Shoreline Substantial Development permit. Shoreline permits are subject to review by the Hearing Examiner and the State of Washington. The review process for a Shoreline permit may take at least 6 months from the date of -a complete application until final approval by the state. Criteria Shoreline permit applications are subject to review..under the criteria contained in the City of Edmonds Shoreline Master Program. Application Procedure Prepare and submit an application for a shoreline permit. Your application must include the following: a. Completed and signed application form. b. Environmental Checklist. c. Environmental Assessment. d. Filing fee of $422.00 plus the actual cost of legal advertisements. e. The names and addresses of owners as shown on the records of the Snohomish County Assessor and street addresses of property within 300 feet of any point of the subject property. f. Legal description of subject property. h. Five copies of a vicinity map, no larger than ill, x 1711� indicating relationship of the site to adjacent lands and the uses to which they are put for at least 400 feet in all directions from the project site. i. Five copies of a site plan no larger than 1111 x 1711, drawn to scale, showing: 0 W;12 0 a Eta (1) Site boundary and di amosivis in vicinity of project. (2) L ol contours using 5-foot inter cro.stsbase.ctions. If or ject includes grading, fillip Iteration of contours, then either: 0) Indicate existing and proposed contours and items (3) through (8) below; ON ""I de two cross sections, one showing existing ground elevati'"' and height of ai�ructu—, th a second showing pr ... sad Ground lay.t-os and height of proposed structures, with both showing (4) below. (3) Size and location of existing improvements which will be retained. (4) Ordinary high water mork. (5) Size and location of proposed structures. (6) M xi u height of proposed structures above existing grade IM71 (7) Type and amount of proposed fill. (8) Proposed utilities. 2. !!earing Examiner Review. You will be assigned and notified of a hearing date as soon as the application is determined to be complete. Hearing Examiner meetings are held at 9:00 a.m. on the first and third Thursdays of each month, unless otherwise noted, in the PI — Matti ag, Room, Library Building, 650 Main Street' Ed ... d" and are ,an to.the publi c. A maximum of five appli cartions are scheduled per meeting, You or ,or repr:.,e a , -- must appear at the hearing so the Maori ng .amice, . ask t�t t .. carming E an an ions your application. Should you or your representative be unable to attend the meeting, or if you wish to withdraw your application, please notify the Planni uO Division in writing at least four days before the meeting. The lalring E .. 1h,, isu.s his decision ten marking days fall owing the _ailas, on of the eari a dec I be final unless a a as an w!tI t p pg. Hi isi wri t�emtaapp ". at ting reasons, is f led wi In he lapping Director within a working days after the date the decision is rendered. Appeals will be heard by the City Council. 3. Filing WithhaThe State The Community Development Director will file copies of i; f.11_ig; with th Department of Ecology and the Attorney General within eight d: Y, of the final City action on a shoreline permit: a. Decision. The final decision of the City on the permit, and the permit if it was approved. 0 b. Application. The application form, site plan and vicinity map. - The environmental checklist, threshold c. E viro men a 'the t�-I, deMorm7a. ion Gatd declarationj of nonsignificance or the am nt-I i,p . lie. of thi:..�twri.l, hgtacs�.Iemiept, , p vJro ammor a ' on f t t—s and dates of actions a nmental data may be filed. d d. Notice. The affidavits of notice. 4. Effective Date. by an approved shoreli uN' iconstructiln :utb'rized �eratit nay begin at 1 30 days fter Department f E.-I gy and ,u At are y G neral have completed their review ofo the docaments spt.ci f7ed i pe#3 Note: This information should not be used as,: substit.ute for City x You sh h d tails of your cod�s and a oul it rev w all t a r tgulatiGnS. projec wi h the Planni ng Division at 250 Fifth Avenue North t (771-0220) between 9:00 a.m. and 5:00 p.m. Monday through Friday. 0 cj SHORLINE/BROCHURE 11/92 on 0 Furthermore, if permits were issued for this project, we will invariably have skyscrapers in downtown Edmonds. As property owners, tax papers and voters we Just Say No to this and any other endeavor that would mar the beauty of Edmonds. r rs t t se hn Lavalle'e qJy L a a 1 Ide z C/3 U) LU: La -j (1) LL LU & 2 r- C2 U- D uj z �— 0. Z F- LU Uj: U U)i 0- 0— LU LUI �L- 0 z LU cn 0 z 3a �1- Ln L'- I wo LL Uj' z a z 53 uj: U)! 0;: 0 E LU 3: LL U 0 z to "ARBLE & GFLANITE COMPANY INC. 4 v �129AIIZ- co —a, L "ra m . t� - T c IQ qS/Tkv CV 46 4tkL I vvi pal 0 L -6) \M&VVVI, 1;�>tAl� �7 �t .. Acol oL v, Ph