Loading...
410 4TH AVE N (2)SNOIXOMISH CO. FIRE DIST: I V1111 Serving Brier, Edmonds, and 12425 Meridian Ave S Mountlake Terrace Everett, WA 98208 Phone (425) 551-1200 www.FireDistrictl.org Fax (425) 551-1272 LOCATION: 410 4 th Avenue N 98020 BUSINESS NAME: Edmonds Center for the Arts MAILING ADDRESS: 410 4th Avenue N, Edmonds, WA 98020 BUSINESS OWNER: EMERGENCY-1 Edmonds Cntr for the Arts KEY ACCESS-2` EMAIL: OERSON CONTACTED: CkLL NAME OF INSPECTOR: �Ajorxis FIRE SYSTEMS: AS 2/13 FA 2/13 FE FD Lk Bo�� Date Last Serviced* 1) ),5- 91144- I HAZARDS FOUND AND LOCAT16NS/COMMONICATIONS 6 7 PHONE: 4252734485 FIRE PREVENTION' INSPECTION REPORT [3EDMONDS 0 BRIER [3 MOUNTLAKE TERRACE [3 UNINCORPORATED e' FREQUENCY STATION & SHIFT], Annual 17-A SCHEDULED DATE DUE 0 Dec 2015 IUFIR 181 203 L HOME PHONE: HOME PHONE . : 4252754485"'" 01 CURRENT HOME PHONE: ..,CITY YE, NO BUSINESS LICENSE INITIAL INSFECT1OifDAjr,- 6 I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X 1st RE -INSPECTION 2nd RE -INSPECTION INAL RE EXTENSION -INSPECTION VIOLATIONS DATE DUE: DATE DUE:---- DATE DUE- CITED: PERSON PERSON E P RSON CONTACTED: CONTACTED: CONTACTED: IINSPECTOR: INSPECTOR: INSPECTOR: DATE: DATE: DATE: VIOLATIONSI­� PRE -CITATION d*ffOWN I_SS_UE D__'_ 15 I NUMBER- 14 6 DATE: CODE sE�qTPN:.. RETURN RECEIPT 3 3 7 RECEIVED DISPOSITION: 18 DATE: LETTER NEEDED YES NO LETTERNEEDED [:] YES NO 8 SN01 F D I ! w*'Serving Briei; Edmonds, and Mountlake Terrace 1Twww.FireDiAtrt&1. org 12425 Meridian Ave S Everett, WA 98208 Phone (425) 551-1200 Fax (42-5) 551-1272 FIRE PREVENTI N INSPECTION REPORT 'R(EDMONDS /0 BRIER 0 MOUNTLAKE TERRACE El UNINCORPORATED FREOLIENCY I STATION,& SHIFF) Antwal SCHEDULED Dix. 2014 DATE DUE 0 1 IJIFIR 1,, 233 2W ADDRESS: 410 41.h Avnnuc N, 2nd Floor, Edamrids, VVA 08020 BUSINESS OWNER: HOME PHONE: EMERGENCY-1: HOME PHONE: CURRENT KEY ACCESS-2: HOME PHONE: -"=ITY YES NO L BUSINESS .0 Ej EMAIL: LICENSE PERSON CONTACTED: Chylj INITIAL INSPE ATE NAME OF INSPECTOR: �-IHF SYS ILM's: FE f z - N LOCATION: 440 +th A\mnue N 2tid Floor QSUD BUSINESS NAME: SLclla Voris Azadcrriy PHONE: MAILING HAZARDS FOUND AND LOCATIONS COMMUNICATIONS 'mo Ale" ZIP 2 2 '3 3 4 4 5 5 6 6 7 7 I AGREE TO CORRECT THE ABOVE VIOLATION(S) IN THE NEXT 30 DAYS X 1st RE -INSPECTION DATE DUE: 2nd RE -INSPECTION DATE DUE: 1 EXTENSION GRANTED TO: FINAL RE -INSPECTION DATE DUE: VIOLATIONS CITED: PERSON CONTACTED: PERSON CONTACTED: PERSON CONTACTED: 1 INSPECTOR: INSPECTOR: INSPECTOR: 2 DATE: DATE: DATE: 3 VIOLATIONS 1 5 VIOLATIONS 1 5 PRE -CITATION LETTER SENT CITATION ISSUED NUMBER: 4 2 6 2 6 DATE: CODE SECTION: 5 3 7 3 7 RETURN RECEIPT RECEIVED 6 4 18 4 8 DATE: DISPOSITION: 7 11� LETTER NEEDED C] YES NO LETTER NEEDED F] YES El NO 8 FIRE'DEPARTMENT COPY ,44essage Page I of 3 Westfall, John From: Westfall, John Sent: Monday, October 15, 2007 10:46 AM To: 'Jeff Vaughan' Cc: Mclalwain, Joe; Clifton, Stephen; Bullis-,,.,Ann 'Subject: RE: Occupancy of classroom,for'Edmo6ds Repertory Theatre ;Jeff: Al is"a Building Code occupancy classifidation for "theater" assembly. A3 is an "assembly use ,intended for worship, recration�ori amusement and other assembly uses not!c.lassified elsewhere". Your phase -B spaces are operating under existing conditions, with few electrical and addessibility upgrades performed to date. The gymnasium was brought up to an occupancy levdL,to accommodate temporary use of CCF services, that I don't believe they actually used. Gymnasium is part of BOH plans for phase B final work and is still not complete. John, ----- Original Message ----- From: Jeff Vaughan [mailto:Jeff@edmondscenterfo.rthearts.org] Sent: Monday, October 15, 2007 10:32 AM To: Westfall.jJohn. Cc: McIalwain, Jbe;,'Clifton;; Stephen Subject: RE: Occupancy of classroom for-Urnonds, Repertory Theatre John, Thank you very much for your response and attention to this matter. Could you please explain further the difference between All and A3 classifications on occupancy? I am not familiar. Not taking into consideration yet future�plans for phase B, as -is presently, what is our occupancy classification and what are our use restrictions for the upstairs classroom spaces and the gymnasium? I'm not sure I've had a specific understanding of this. Thanks for your all of your help! Best regards, Jeff From: Westfall, John [mailto:Westfall@ci.edmonds.wa.us] Sent: Monday, October 15, 2007 10:18 AM To: Jeff Vaughan Cc: Joe McIalwain; jeff@edmondsrepertorytheatre.org; Jeff Miller; Cruz, Cindi; Bullis, Ann Subject: RE: Occupancy of classroom for Edmonds Repertory Theatre Jeff: I discussed the rehearsal "Sanctuary" area with Building Dept. ECA is not complete with Phase B/2 at BOH, where Balcony, level area is located and where work is still required. Ann Bullis and I made walk-through in summer 2006 with Joe to look at existing i conditions and,wha * t still was required for plans, approval @ BOH. Among others, the exits there were an issue due to the multiple doors and alcove areas at the four corners 10/15/2007 Message Page 2 of 3 pr 4 of the space. The phase B plans show A3 occupancy here and "theater" requires Al, so architect must design change of use for this area before theaters may safely use for that purpose. Building & Fire have not evaluated whether Al could be accommodated in that space and a pre -application meeting is suggested before promising to Edmonds Repertory events. Thank you, John ----- Original Message ----- From: Westfall, John Sent: Friday, October 12, 2007 2:25 PM To: 'Jeff Vaughan' Cc: McIalwain, Joe; jeff@edmondsrepertorytheatre.org; Jeff Miller; Cruz, Cindi; Bullis, Ann Subject: RE: Occupancy of classroom for Edmonds Repertory Theatre Thanks,Jeff. I've just found out about this interest yesterday, along with interests in some other multiple -use spaces. I haven't had a chance to evaluate your sanctuary space for performance, occupant load, seating arrangements, nor any others. Thanks for your offer and comments. John ----- Original Message ----- From: Jeff Vaughan [mailto:Jeff@edmondscenterforthearts.org] Sent: Friday, October 12, 2007 1:59 PM To: Westfall, John Cc: McIalwain, Joe; jeff@edmondsrepertorytheatre.org; Jeff Miller; Cruz, Cindi Subject: Occupancy of classroom for Edmonds Repertory Theatre Fire Marshal Westfall, We've been approached by Jeff Stilwill of Edmonds Repertory Theatre to potentially host their performances here, in our largest upstairs former "sanctuary" space. I know that you have been in discussion with Jeff about the specifics of our capacity to host the performances. I provided Jeff with occupancy numbers, which had been given to me by Cindi Cruz, and are likely old. I am only aware one other rather large occupancy number that encompasses the entire of the back of house, including the gymnasium, that was issued to us recently. As you know, Edmonds Repertory Theatre are looking at attendance of around 50 people to start with for their productions. If there are existing specific limitations on individual rooms, I would like to have a greater understanding. Jeff mentioned that you had raised a couple of issues or concerns and were working to find the answers. Specifically, they have asked if our chairs interlock, as being one potential issue. In my history of a similar scenario, I remember being limited to line up no more than 14 chairs in a "row" without inter -locking them. You may find regulation to the contrary, I just wanted to share what I remember. If there are other issues that need resolution, please let me know. As Edmonds Center for the Arts, we want to be a resource for other performing arts groups, and hope to look to the future for partnerships to share and utilize this facility, as a true "center"for the arts in Edmonds. That said, we want to make sure that we proceed with all of 10/15/2007 Message Page 3 of 3 the necessary safety precautions and requirements. We would only host their performance with you having complete understanding and approval. Thank you very much for your time. As this is a bit of a time sensitive issue for them, if there is anything that I can do, please let me know. Best regards, Jeff Jeff Vaughan Operations Manager Edmonds Center for the Arts 410 4th Ave. N. Edmonds, WA 98020 Tel: (425) 275-9481 Fax: (425) 275-4487 jeff@edmondscenterforthearts.or 10/15/2007 Message Page I of 2 Westfall, John From: Westf6ll, John Sent: Thursday, August 16, 2007 11:21 AM To: Graf, Jeannine Subject: RE: ECA Choir Risers 410 4th Ave N. Jeannine: The abated area please treat for bldg demolition permits as you would any other. I'll keep this information on file for the other music bldg choral room. My intent with permit ordinance in 2003 was to eliminate redundancies with other regulatory licensing/permitting agencies. Asbestos abatement isn't specifically mentioned in ordinance, nor by IFC, but can be generalized in Hazardous Materials construction permits 105.7.6. L&I already permits work and adding another layer of permits local frustrates the genuine efforts. And I still wish to make prescriptive notes where appropriate on projects that may indicate such a (L&I) requirement. Does this work for Bldg? John ----- Original Message ----- From: Graf, Jeannine Sent: Thursday, August 16, 2007 9:57 AM To: Westfall, John Subject: FW: ECA Choir Risers John This is the response from ECA on the asbestos removal. Do we still want a permit? Let me know your thoughts. Thanks Graf ----- Original Message ----- From: Jeff Vaughan [mailto:Jeff@edmondscenterforthearts.org] Sent: Tuesday, August 14, 2007 10:58 AM To: Graf, Jeannine Cc: McIalwain, Joe; Clifton, Stephen Subject: ECA Choir Risers Jeannine, Per our conversation this morning, here is a description of our choir riser project. Please see two attached photos. There are two choral rooms in the music building. One has had the VAT tile removed from the risers, the other has not, and is shown as an example of what existed previously. To maximize floorspace for storage of orchestra equipment (music stands, orchestra shell, musicians chairs, etc) as well as tables and chairs for special events, we wanted to maximize the floorspace by removing the risers, which utlize an estimated 240 sq. feet or so of floorspace. All of our equipment is on wheels or carts, having a large level surface is ideal for our storage purposes. As the renovation project was coming to a close at the end of last summer, we began to remove the risers, when it was pointed out to us that tiles likely contained asbestos. The room was sealed pending testing. 8/16/2007 Message Page 2 of 2 As recommended, we contacted Jim O'Malley of EHS International, who set up testing and confirmed the presence of asbestos. He provided contact information for three asbestos abatement contractors, we solicited for a quote, and chose the lowest. The contractor was Performance Abatement Services out of Seattle and my contact was Gary Hansen. Upon hiring the company just recently, they made mention that they would file permits and may have specifically mentioned Washington State Department of L&I. I don't recall from them any question of the need for a city permit, nor do I think they mentioned that they would aquire a permit from the City of Edmonds, per se. I personally did not think to ask the planning department about for what I believed to be "removal" and not "construction". Upon completion of the work and certification from the contractor, I presented the information to Fire Marshal Westfall. The VAT that remains adhered to the concrete slab will stay, and it was recommended to us by the abatement contractor to tape the edge of the VAT where it met the first riser, once it has been removed, to protect that edge from damage. No other modifications are planned in any part of the music building at this time. It is still our desire to remove the riser structure to maximize floorspace. We can, however, use them in place, using portable ramps to move equipment from level to level as shown in the picture of the other room. In the interest of full disclosure, you might notice that there are a few electrical outlets and some air supply ducts built into the structure of the risers. Because of the underlying concrete slab, its likely that the electrical outlets are connected with metal clad cable run from a junction box on the rear or side wall. Please understand that it was never our intention to avoid any permit process required, but lack of knowledge on my part that it might have been required, was why you haven't heard of our plans previously. Please let me know if there is any other information you need, and how you would like us to proceed. Thanks very much. Best regards, Jeff Ojeff Vaughan Technical Director Edin on ds Cen ter for th e A rts 410 4th A ve. N. Edmonds, WA 98020 Yel- (425) 275-9481 Fax: (425) 275-4487 Email J!��.Medmondscenterfbrthearts Q�W 8/16/2007 Wesffall, John From: Westfall, John Sent: Monday, August 13, 2007 9:44 AM To: Graf, Jeannine Cc: Bullis, Ann; Smith, Mike Subject: VAT (Asbestos) Abatement 410 4th Ave N Jeannine: I have a report of final completion from Performance Abatement Services of Seattle that the asbestos tile has been completely removed from the ECA music building. I don't find a COE building permit. The project was logged by L&I. SPAS PERFORMANCE ABATEMENT SERVICES SEATTLE OFFICE 422 South Forest Street * Seattle, WA 98134 9 TTL: (206) 467-8733 9 FAX: (206) 467-6307 CERTIFICATE OF FINAL COMPLETION FOR ASBESTOS ABATEMENT Distributed to: Jeff Vaughan — Technical Director Edmonds Center for the Arts 4104 1h Ave N Edmonds, WA 98020 PROJECT: Edmonds Center for the Arts — VAT Abatement FROM: Performance Abatement Services, Inc. 422 S. Forest Street Seattle, WA 98134 Ph. (206).467-8733 Fax (206) 467-6307 DATE OF ISSUANCE: 8/6/07 SITE ADDRESS: 410 4 th Ave N, Edmonds WA 98020 INO The asbestos abatement work for the above referenced project area has been completed in accordance with applicable asbestos abatement requirements of federal, state, county and local agencies. The work performed under this contract has been removed and found to be 100% complete as per the PAS proposal dated 6/15/07. The date of final completion for the area above is hereby established as 7/24/07 , at which time the area is returned to Edmonds Center for the Arts. PLEASE NOTE: It is not Performance Abatement Services all asbestos containing materials or presumed asbestos from each structure, unless specifically directed to do so work, therefore, there may still be asbestos materials or materials within the structure. intention to remove containing materials under the scope of presumed asbestos Performance Abatement Services, Inc. Aug st 6, 2007 CONTRACTOR BY Aaron Ri6htm#er DATE Labor and Industries NOTICE OF Industrial Hygiene Compliance (Regional addresses and phone ASBESTOS ABATEMENT numbers on page 2) PROJECT THIS NOTICE MUST BE RECEIVED NO LATER THAN 10 CALENDAR DAYS PRIOR TO THE START DATE COMPLETE ALL APPLICABLE BOXES - INCOMPLETE OR ILLEGIBLE NOTICES WILL NOT BE ACCEPTED MAIL OR FAX TO THE REGIONAL OFFICE - CIRCLE CHANGES ON AMENDED NOTICES Notice date: 07 / 13 / 07 Initial Amended[] Site Work Hours Su Mo, Tu We Th Fr Sa Start date: 07 / 23 107 On Hold Off Hold E] 7:00 am to am Ix rx I Completion: 08 / 31 / 07 Emergency El pm 3:30 pm Project Dates and Work Hours must be Exact CONTRACTOR PROPERTY OWNER Company Name Name Performance Abatement Services, Inc. Edmonds Center for the Arts Contractor Certification Number Owner's Agent 1016 Jeff Vaughan Signature Company Edmonds Center for the Arts PrintedN—arne Address Aaron Richtmyer 410 4th Ave N Phone Number city State ZIP' +4 206467-8733 Edmonds WA 98020 Job Site C.A.S. Phone number Marty Morgan 425-275-4485 JOB SITE FACILITY Address Type 410 4th Ave N Theater Building Name Room Age Size Edmonds Center for the Arts city Edmonds WA Remodel El Demolition ZIP + 4 County 98020 Snohomish Repair El Maintenance QUANTITY OF ASBESTOS TO BE: REMOVED [I ENCAPSULATED Quantity 270 _ square feet I . n./ Indoors 1­1 011MAA�Q [3 Fireproofing Boiler insulation CONTROL MMASURES 0 Popcom ceiling Duct paper D Neg. pres. enclosure Wrap & cut [I CAB VAT [] Glove bag Wet methods DSheet vinyl Roofing El Mini enclosure HEPA vacuum Asbestos paper El Other D Critical barriers Manual methods rR=-1i-1y I inear feet 0 Other Air Monitoring Other Re-culated Area 1 L3 Mag. pipe insulation [I Cement asbestos pipe RESPIRATORY PROTECTION [3 Air cell pipe insulation El Mudded pipe ins. 0 Y. mask APR L1 Type C continuous flow Ducting/duct insulation Duct tape Full face APR Type C pressure demand Other Other PAPR f7l Other F413-025-000 notice of asbestos abatement project 9-02 For clean copies go to http://www.Ini.wa.gov/forms/ :s EDMONDS PUBLIC FACILITIES DISTRICT Edmonds Center for the Arts A Emergency Preparedness Topics 10 May 2007 1. Contacts and protocol for working with Emergency Services Personnel a. staff plan for who deals with what / whom: staff issues, patron issues, building b. one staff to be last one out, or to stay to direct emergency services? 2. Understanding and reacting to fire alarm system and building systems in emergencies a. Fire alarm panel; silencing b. Elevator operation c. Annunciator d. Electro-magnetic door holders e. Fire sprinkler system; inadvertent sprinkler head removal. 3. Specific emergency protocols: Two scenarios: "business day" and "in performance" a. Fire Alarm (known false alarm) b. Fire 1. Investigation: fire alarm panel, zone 2. sealing off 3. fight small fires with extinguishers? c. Earthquake d. Fumes e. Power Failure f Personal medical emergency: 1. move or don't move 2. questions to ask g. Car accident / parking lot h. Violence / Robbery 4. Emergency communications: a. Notification to audience: bullhorn? Script? b. Communication between staff c. 911 d. Volunteers �'i -i. it Edmonds Center for the Arts Emergency Preparedness Topics Page 2 5. Building Evacuation: aa. When to evacuate a. Evacuation Routes: posting? b. Sequence: Instructions on order? c. Balcony, 2 nd floor / ELEVATORS d. gymnasium e. Outside meeting place: 4 th and Daley. 6. Training: a. CPR / I s'Aid b. First responder: Oxygen, AED c. Volunteer training: evacuation, fire extinguisher d. Fire Alarm panel / fire drill 7. Misc: a. limiting access, exit corridors b. Equipment recommendations c. Accident / emergency event reports Message Page I of 1 Westfall, John From: Westfall, John Sent: Thursday, May 10, 2007 3:03 PM To: 'Jeff Vaughan' Cc: Clifton, Stephen; Mclalwain, Joe Subject: RE: Edmonds Center for the Arts - Emergency Procedures Mr.Vaughn: My apology for the delayed response. I suggest that fire department can evaluate and provide good insight into your plan/procedures. I'll see you at the meeting today. John Westfall 425-771-0213 ----- Original Message ----- From: Jeff Vaughan [mailto:Jeff@edmondscenterforthearts.org] Sent: Thursday, May 03, 2007 2:28 PM To: Westfall, John Cc: Clifton, Stephen; McIalwain, Joe Subject: Edmonds Center for the Arts - Emergency Procedures Fire Marshal Westfal, We have begun to convene regular safety meetings at ECA to discuss concerns, find answers to safety issues and develop protocols and training for staff. We have come up with a fairly extensive list of questions relating to emergency procedures and would like to know where to go for help in finding answers. No one that works for Edmonds Center for the Arts or Edmonds Public Facilities District has any specific or formal training on public assembly safety procedures and I thought that the city fire department might be the place for us to go for answers to our questions, rather than formalizing a procedure that just sounds good to us. I would very much appreciate any recommendations you could offer on how we could find help. If it were helpful, I could meet personally, and/or type up our list of questions for consideration. Thanks very much. Best regards, Jeff F] Jeff Vaughan Technical Director Edm on ds Cen ter for th e A rts 410 4th Ave. N Edm on ds, WA 98020 Tel.- (425) 275-9481 Fax.- (425) 275-4487 Email- leff scenterforthearts org pedmond 5/10/2007 Messagc� Page 1 of 3 W,iastfall, John From: Westfall, John Sent: Wednesday, February 07, 2007 3:39 PM To: 'Jeff Vaughan' Cc: Clifton, Stephen; Mclalwain, Joe; Bullis, Ann Subject: RE: Stair 3 door to roof : ECA 410 4th Ave N Jeff: Thanks for your escort Monday and for the opportunity to answer your questions. Building and Fire depts approve the following: 1) You may lock the rooftop door to defeat the panic hardware as the'door is not a required/approved exit. 2) Panic hardware or accessibility hardware (paddle -type) are not required (there). 3) 1 suggest a temporary barrier (such as a chain) across the final stair flights leading up to this door and provide a sign NOT AN EXIT - ECA PERSONNEL ONLY or some related and approved wording. John Westfall Fire Marshal 425 771-0213 r, - ----- Original Message ----- From: Jeff Vaughan [mailto:Jeff@edmondscenterforthearts.org] Sent: Saturday, February 03, 2007 10:49 AM To: Westfall, John; Clifton, Stephen; McIalwain, Joe Subject: RE: Stair 3 door to roof Fire Marshal Westfall, Thank you for your response. Please let me know when you might be by so that I can look at the door with you. I believe our issue to be less about signage and more about wanting to secure that particular door if it is in fact not an emergency exit. We want to lock that door so that only those with a key can get to the roof. The door currently does not have an exit sign above it. Can we remove the exit device on the inside of the door and replace it with a lock set? Best. Regards, Jeff Vaughan From: Westfall, John [mailto:Westfall@ci.edmonds.wa.us] Sent: Friday, February 02, 2007 3:55 PM To: Clifton, Stephen; Jeff Vaughan Cc: Joe McIalwain; Bullis, Ann Subject: RE: Stair 3 door to roof Thanks, Stephen. That looks like a good option and to install on the flight below the roof level. I'd like to see if this is where I think it is. John ----- Original Message ----- From: Clifton, Stephen Sent: Friday, February 02, 2007 1:35 PM 2/1/2007 Message, Page 2 of 3 To: Westfall, John; 'Jeff Vaughan' Cc: McIalwain, Joe; Bullis, Ann Subject: RE: Stair 3 door to roof I recommend installing a sign that states, NOT AN EXIT ECA PERSONNEL ONLY Stephen Stephen Clifton, AICIP Community Services Director 121 - 5th Avenue North Edmonds, WA 98020 425-771-0251 Clifton@ci.edmonds.wa.us ----- Original Message ----- From: Westfall, John Sent: Friday, February 02, 2007 11:07 AM To: 'Jeff Vaughan' Cc: Clifton, Stephen; McIalwain, Joe; Bullis, Ann Subject: RE: Stair 3 door to roof Mr.Vaughan: The roof is not an approved exit. I'm not sure how the exit signage became configured to this door. I'll be by to view. Thank you, John Westfall 425 771-0213 ----- Original Message ----- From: Jeff Vaughan [mailto:Jeff@edmondscenterforthearts.org] Sent: Friday, February 02, 2007 7:48 AM To: Westfall, John Cc: Clifton, Stephen; McIalwain, Joe Subject: Stair 3 door to roof Fire Marshal Westfall, Hope all is well with you. I have a question concerning a door at the top of stair 3 to our roof. This door does not have an exit sign above it, but it does however have an exit device (panic bar) fitted to the inside of the door. What this has meant for us since we have been open, is that on occasion, visitors to the building have wandered out on to the roof without our knowledge because we cannot secure that door and it is out of view from where we normally work in the building. What, if any, options do we have within the appropriate code requirements for securing that door? Is it a requirement even though there is no exit sign above the door, for that door to not be locked? Thank you for any help that you can offer. I would be happy to answer any additional questions you might have. Best Regards, Jeff Vaughan Technical Director 2/7/2007 Message. Page 3 of 3 Edmonds Center for the Arts 410 4th Ave. N. Edmonds, WA 98020 Tel: (425) 275-9481 Fax: (425) 275-4487 0 eff(cbedmondscenterforthearts.or_q 2/7/2007 a AP CITY OF EDMONDS FIRE DEPARTMENT PERMIT January 4, 2007 January 7, 2007 Date of Issue UFIR Number Date of Expiration This PERMIT is issued to: I Center for the Arts located at: 1410 4th Ave N Edmonds, WA To engage in the business, occupation or process of: T—Temporary Tent/ Banquet And shall constitute permission to maintain, store, use or handle materials or to conduct process which produce conditions hazardous to life or property or to install equipment used in connection with such activities as follows: 1 ) Portable Fire Extinguishers required in tent and locations called out in gym. 2) Exits must remain visible and unobstructed (except NE gym exit) 3) Power cords must be removed from stairwell prior to concert. 4) Fire watch required at stairwell doors while propped open. 5) Portable heater/boiler must be parked on theater property/heater cannot be operated from 7:00PIVI to 7:00AIVI. I Allowed Occupant Load: 1425 Pursuant to the provisions of the International Fire Code, any violation of the Code may be grounds for the revocation of this PERMIT. This permit does not take the place of any license required by law and is not transferable. Any change in the use or occupancy of premises shall require a new permit. Fire Marshal Fire Prevention Division This Permit Must Be Posted At All Times in The Premises Mentioned Above City of Edmonds Community Development Code 19.75.060 to off .wa"o* I - 1. A, effy-l"6-r- . J� MEMORANDUM Date: February 6, 2007 To: Development Services Lead Marie Harrison From: Fire Marshal John J. Westfall 425.771.0213 Subject: BLD20070060 Clearwire ECA Collocate 410 4 1h Ave N. The following project has been evaluated under the 2003 International Codes and Edmonds Community Development Code. Provide valve -regulated lead acid (VRLA) or lead acid battery manufacturer cut sheet and Material Safety Data Sheet (MSDS) in weatherproof container posted next to equipment cabinet. 2. Callout number of batteries used for backup or provide volume of battery electrolyte. Identify sulfuric acid electrolyte hazard with NFPA 704 diamond posted on gale. NFPA label is blue-2, red-0, yellow-1, white-n/a. Post weatherproof diamond no less than 8" square on approach to equipment exterior. 4. Seal penetrations in fire walls and partitions where core -drilling, power or signal wiring move through fire -rated assemblies. See IBC 712. Cc: Mr. Todd Walton, Clearwire, fax 361-9606 Asst. Building Official Ann Bullis City of Edmonds Sb Fire Marshal TRANSMISSION VERIFICATION REPORT TIME 02/06/2007 17:40 NAME FAX TEL DATE,TIME 02/06 17:39 FAX NO./NAME 92063619606 DURATION 00:00:58 PAGE(S) 02 RESULT OK MODE STANDARD ECM TEL12-70 VALVE REGULATED LEAD ACID BATTERY FOR COMMUNICATIONS STANDBY POWER APPLICATIONS FEATURES Flamo-arresting one-way pressure -relief vent for safety and long life. Thermally welded case -to -cover bond to ensure a leak -proof seal, Flume -retardant polypropylene case and cover compliant with UL94 V-0 with an Oxygen Limiting Index of greater than 28. Absorbent Glass Mat (AGM) technology for efficient gas recombination 99% plus. Thick positive plate design for maximum service float life — 10 year design life. Complies with UL1 778, 924, 1989 and 94 V-0, UL-recognized component. Can be used in any orientation. Upright, side or end mounting recommended. LOW -profile terminals with threaded copper alloy inserts for reduced height, reduced maintenance and increased safety. Multicell design for ease of installation and maintenance. Not restricted for air transport — Complies with IATAIICAO Special Provision A67 • Not restricted for surface transport — classified as non -hazardous material as related to DOT-CFP Title 49 pans 171-189 • Not restricted for water transport — classified as non-ha2ardous material per IMDG Amendment 27, 12 Volts — 69 Ampera Hour Capacity Cm 8 Hour Rate I Ampere HOW COPaCity 10 1.75 Volts per Cell Q 771 (26'C) 3.00 A', 00 5.00 - t:00 - 7.00 - 8-.06 . 10.00 112::.,00': 20-00 ?4 -.0 0.: 72.00 4 00 Q )k4 49.0 :.66.0.': 59.7 6�.O., 64.0 .66,b- 67.2 _.6�.O- 71.0 .:--'72X- 75.0 77.8 78.6 C&D TechnologieS, 111110. DVNASTV Division 900 East Keefe Avenue Milwaukee, Wl 53212 Phone: 800-396-2789 Fax; 414-961-6506 ==TECHNOLOGIES, INC Fwn 41,7102 OW. 011ft PIWN in 0 L04 I 'd 91 SO 'IN WO:6t 90OZ '91'JPN TEL1240 I 10.126 41 10.17 25$.4 TEL12-70 - Specifications ,�,�Wffl NEW- 6.65 TERMINAL DEIAIL "All dirnen�i" in kh6S &Ad (rAillin,12m) All dmenslons are for reference on�, Conigc( a C&D Reprawmive for complale dlrnirn�onal intormation, .. . maimurn 1 . * nicril�ninisrimprit, , - -OhmS.I.M100, ,�----60-HZW) 6 -10s. 12-.'q4; �5 �bsbrbed- H,SO, 800 AMPS 2100.-. Amps'� 0,0050 Ohms 25 k9 SG.,= 1.300. 69 An & B hour rate to i.7S volm per cell 0 77'F (25'C) Cnpaci� : Y 67.2 Ah ag i o hour rate Eo 1.80 volts per call 0 20* C (68'F) OperatInIR Temperature Ra nge� Discharge; -40- F (-40' Q co �J 60' F (71' C),Fhrr to +140',F 0- C) Wthn peralturecompensato-T ao�mllngll Operating Temperature +74'F (23- C) to +80- F (27'C) Flo4 Charging Yoltagie 13.5 to 13.0 VDC/Unit Average aP 77'F (25-C) Reoc�ommended- maximum Charging , C/5 amperes (12.8 amps dP 100% depth of discharge) 6aff ent Limit' MaXimiArn AC -Ripple (Charger) 0.5% FZMS or 1.5% P-P of float charge voltage recommenced for best results. mliximurn voltage allowed = 4% P-P Maximum current allowed = 3.75 amperes RMS (C/20) E)ynasty Telecom batteries may be Scored for up to 6 months at 77'F (25'C) and Self 016charge' theo a froshening charge is required. For higher temperatures the time interval will be shorter, .Accessories inter unit conneUors, racks allcl cabinet y,.tpms are available. 'Terminal Threaded copper alloy insert terminal to accept 1/4-20 UNC bolt. Te"lht.1 Hardware initial Torque 110 in.-lbs. (12.4 N-M). Constant Current Discharge Ratings - Arriperes 0777(256C) End Point Operating Time to End Point Voltage (in hours) : Volls/cel! L 00; Ol 1.75 0.78 -49 28.0 75.6 1,�.: 0. 11.0 :9.6o'.: 8.63 .-.:110'� 6.01 -13,75'� .1 1.00, 1.80 27.0 '.JA3 15.2 '.1.2.,6 10.8 -946 " 8.39 6.92 5.86 �'-V.62-:.: 3.08 0.77 0' : 2.9 4 0.74 1.85 25.� .....16,3: 14.6 -i2...! 10.3 9.'10 - 6,05 COD- 5.59 .: 1 10'2. 1.90 :W*0:-' 24.2 -.: 1'.1.4 13.8 9.90 '.:8;70:- 7.75 BAO: 5,42 2.75 .'0-04 0.69 Note: Batteries to be mounted Mth 0.5 in. spacing minimum and free air ventilation. Specifications subject to change without notirication, M-- - - Z 'd 9��O 'IN NV80:�l 90H 91,JPN IMMOSIMED ELECTROLYTIE Federal regulation 40CFR Part 370 requires that commercial and industrial facilities with 500 pounds or more of sulfuric acid file an annual report stipulating the total weight of pure sulfuric acid and it's location on the premises. The inventory report is typically filed with the State Emergency Response Commission and County Emergency Planning Committee. The purpose of this report is to inform the community, fire fighters and emergency response teams of potentially hazardous situations in the event of a fire or other disaster involving the facility or community at large. The electrolyte in a Dynasty VRLA battery is an immobilized dilute solution of sulfuric acid (1-12804) and water (H20). The sulfuric acid is considered a hazardous material. The specific gravity of pure sulfuric acid is 1.835 and the percent sulfuric acid in the electrolyte determines the electrolyte specific gravity (SG). The electrolyte in the DYNASTY VRLA battery is immobilized in either a gelled form or is completely absorbed in an absorbent separator; it is not free to flow from the batteries in the event of mechanical damage to the container. Consequently spill containment should not be required. The current regulation makes no clear distinction between immobilized and liquid electrolyte batteries and as a result, if the total weight of sulfuric acid exceeds 500 pounds it must be reported annually. Typically this requirement impacts facilities such as large telecommunications sites, large computer centers, power generation and distribution centers and similar sites utilizing in excess of 39 kilowatt hours of battery system. Typically the stationary lead acid battery electrolyte has a specific gravity within the range of 1.215 to 1.320 depending on the design. The Dynasty VRLA batteries have an electrolyte specific gravity in the range of 1,280 to 1.300, depending on the model. Table 1 indicates the volume and weight of the electrolyte as well as the percent pure sulfuric acid per Dynasty VRLA battery model. The information normally included in the report is the total weight of the sulfuric acid in pounds, as shown in Table 1, for the complete battery system(s). E 'd MOA Nvgo:�� 90H 91,JPN Mar.16, 2006 12:08AM No, 0516 P. 4 C C C C r- m z r r M F T X T X C C C a a 0 0 I R 9 c c c c a a a d c c c c c In III m m 4 -4 p p m 0 w 0 w L U) I I L — — — — — — , W55 ovv 0 0 0 p P p F:3 p S, 9 Poop 0 k 4F, NO ga'd, U —x' Q-� N FL 0 Q (a E4 T q 0 M After View looking Northeast Option I Edmonds Center for the Arts WA-SNO177-A 410 4th Ave N. Edmonds, WA 98020 Before P I N N A C L E VIEN DESIGN GROUP. INC. Q_ A "commanding presence" changes the face of Edmonds A stunning renovation of the original 1939 Edmonds High School auditorium is complete, and the new Edmonds Center for the Arts (ECA) is ready to be unveiled. ECA is a state-of-the-art, 690-seat, performing arts venue located just three blocks north of downtown Edmonds. More than 80,000 people will walk through its doors or be impacted in some way by its programs each year. An extensive list of some of the best music, dance, comedy and theater from around the world will perform in this magnificent venue as well as known lol, community organizations like Olympic BalletTheatre, Cascade Symphony Orchestra, and-Sno-King Community Chorale. Beginnii ng October 23, 2006 with a performance by Cascade Symphony Orchestra, local arts groups and rental clients will soon begin to appear on the ECA stage. ECA staff will continue with these "pre -season" events through the holidays to adjust to the new facility and prepare for its grand opening in January 2007 A ribbon -cutting ceremony and tour of the facility are tentatively scheduled for the afternoon of January 4, 2007 Continued on page 2 The new ECA is a commanding presence on 4th A ve. N. in downtown Edmonds City purchases 5.56 acres for south Edmonds neighborhood park The City of Edmonds recently purchased over five acres from the Edmonds School District to develop a neighborhood park in the south Edmonds area. The, land was purchased for $3.2 million, with another $1.7 million,budgeted for demolition and construction. Two connected "parcels" comprise the site that will allow individuals, families, and youth teams opportunities for both active and passive recreation. One parcel consists of approximately 1.6 acres of wooded terrain, which will remain intact, with a connecting trail to the adjacent formerWoodway High School.The vacant school buildings currently covering the remaining four acres will be demolished, and play structures, perimeter trail, picnic area, and playfields will take their place. Neighborhood parks are an integral part of Edmonds' community park system, and the development of this site, located at 236th St. SW and 104th Ave. W., will fill a gap in the south end of the city's ring of 22 active parks. Once the process of demolishing the vacant buildings is underway, the City will arrange community meetings, which will include local parks designers, to develop concepts for the layout of our newest park. Lighting patterns grace the wall of the 690-seat auditorium Mayor will resume neighborhood meetings in '07 Mayor Gary Haakenson will hold another round of neighborhood meetings next year to hear your concerns regarding community issues. Meetings held earlier this year encouraged many citizens to express their opinions on topics such as Edmonds Crossing, clownsized lots, and traffic. After holding eight neighborhood meetings last spring, the Mayor shared a list of over 125 citizen concerns with staff and the City Council. Next year's meetings will be held. approximately once a month in schools or community meeting places around the city.The first will be at Seaview Elementary onThursday, January 11 from 7 to 8 p.m., and the second is scheduled forThursday, February 8 at Edmonds Elementary. A complete list of next year's meetings will be published in the January issue of Update on Edmonds. Education outreach a key component of ECA Contiriued from page 1 Many of the same world -class performers that appear on the ECA stage will also work directly with students and teachers in - local schools through its "Arts Connections" outreach program. Edmonds Community College will also utilize the new theater for performances and lectures and will partner with ECA to develop internship and training programs for its students. Additionally, the ECA gymnasium, classrooms, and meeting spaces will once again be available for use by the community for a variety of sports programs, classes, and rehearsals. The construction project is on schedule and within budget., Approximately .5p 15.7 million in public and private funds has been raised to meet the total project goal of $18.5 million. Of that number, approximately $2.5 million has been raised from individuals, corporations, and foundations who, because of their support, have played a major role in making this long-standing community dream a reality. Many naming opportunities are still available in the new center, including auditorium seats, locations throughout the interior. of the new center, and the theater building itself. For further information about the campaign, or to find out how to make a gift to the center, please contact Joseph Mclalwain, Executive Director, at 425.275.4483 or joe@ edmondscenterforthearts.org. Please watch for new information to appear on the ECA website at www.edmondscenterforthearts.org as well as articles and announcements featuring a full listing of ECXs preview season of international -presented artists for January - June 2007 You may also go to our website to find out how you can volunteer in many ways and become a part of the ECA family! How to prevent flooding on your property � With the fall season upon us, here are some things you can do in partnership with the street and stormwater public works crews to help prevent drainage problems. 1. Rake leaves that fall on your property and street frontage so that they don't blow into the street. Add them to your curbside yard debris collection or backyard compost, or simply use the leaves as mulch on flower and garden beds. 2. When you see that leaves and other debris have collected over a storm drain grate in front of your property, use a rake or broom to remove them, if it can be done safely. Otherwise, call the PublicWorks Department immediately at 425.771.0235. For situations of imminent flooding, please call 911. 3. Please call the PublicWorks Department if you notice a significant amount of leaves accumulating along the curbline of your street.The City street sweepers are normally operating on a continual cycle throughout the City, Monday through Friday, and will respond as soon as they can. 4. Talk to your neighbors and homeowners associations about being a caretaker for the storm drain grates in front of their homes or the creeks that run through their properties. 5. Never dump or blow grass clippings, leaves, or other debris into the drains, ditches, creeks, culverts, street gutters or ravines. 6. Never discharge or direct stormwater over the side of a steep hill. Your help to lower incidents of flooding is greatly appreciated and will result in fewer insurance claim costs for the City.These costs are passed on to homeowners and businesses through stormwater utility rates. If you have any questions or comments, please direct them to public works. to CD CD 0 03 Z Z� CL CL Mes,sage Page I of I Westfall, John From: Westfall, John Sent: Tuesday, October 17, 2006 5:41 PM To: 'James Petosa' Cc: Smith, Mike Subject: RE: ECA evacuation procedures Jim: I'm sorry I misled you. I was trying to steer you only away from exiting through the 3 hour wall due to concerns over the integrity of that wall to prevent fire/smoke transmission from one end to the other. Use ANY paths that are designated EXIT, deemed appropriate, and (likely) dependent upon the number of volunteers you can populate the egress paths to assist during the event. With early warning from the fire sprinkler and fire alarm systems, the occupants will have the greatest opportunity to all find their way out. I'd like to put a bug in your ear regarding proximate pyrotechnics: Fire Dept permit is required. Nutcracker is one example. Break a theatrical leg and let me know if Fire can help in anyway. John Westfall Edmonds Fire Marshal 425 771-0213 cc: Fire Inspector ----- Original Message ----- From: James Petosa [mailto:3im@edmondscenterforthearts.org] Sent: Tuesday, October 17, 2006 4:58 PM To: Westfall, John Subject: ECA evacuation procedures John, I would like some confirmation on the evacuation plan for the ECA. You had stated that you'd prefer that all patrons exit out the front of the building. My concern with this is that we could have 700 people exiting the front 2 doors of the building and this could result in a panic situation (in my opinion). We do have the exits on the north and south side of the building that could be used. Clarification to this matter would be greatly appreciated in a timely fashion for we have a volunteer orientation on Wed pm. Thank you, Jim Jim Petosa Audience Services Manager Edmonds Center for the Arts 410 4th Ave. N Edmonds, WA. 98020 425 275-9480 425 280-0683 cell jim@edmondscenterforthearts.org 10/17/2006 Message Page I of I Westfall, John From: Westfall, John Sent: Tuesday, September 26, 2006 2:54,PM To: 'James Petosa' Subject: RE: Fire Exits ECA http://www.r-h,ipublib.org/004chicago/disasters/iroquois—fire.html ----- Original Message ----- From: James Petosa [mailto:jim@edmondscenterforthearts.org] Sent: Tuesday, September 26, 2006 10:44 AM To: Westfall, John Subject: Fire Exits ECA John, Thanks for meeting with me the other day, I'll have you know that I have been working on our life safety plan. I believe the one you sent me for CCF will suffice since we are not doing any cooking and such. I think all that I need now is a floor plan so I can run it by you and post it. So the question of the day is this, I'm going to be holding my volunteer orientation soon and as I explain what to do in an evacuation I will need to show the different sections the correct route and fire exit to use. John, am I supposed to come up with this plan on my own or could someone from the fire dept. help me with this? I would love to do this ASAP. Thank you, Jim Jim Petosa Audience Services Manager Edmonds Center for the Arts 410 4th Ave. N Edmonds, WA. 98020 425 275-4485 G im(o)-edmondscenterforthearts.org 9/26/2006 Westfall, John From: Cruz, Cindi Sent: Monday, September 25, 2006 2:47 PM To: Westfall, John Subject: RE: ECA Gymnasium Fundraiser Event 410 4th Ave N Correct the bleachers would be empty. There would be wait staff which I am assuming should be included in the 412. Cindi Cruz Executive Assistant City of Edmonds Community 5ervices Department 425-775-7724 cruz9ci. edmonds. wa. us ----- Original Message ----- From: Westfall, John Sent: Monday, September 25, 2006 2:46 PM To: Cruz, Cindi Subject: RE: ECA Gymnasium Fundraiser Event 410 4th Ave N Cindi: Yes, this is gymnasium use for only tables and chairs on gym floor. Buffet -style or full service -style doesn't affect the calcuations. I'm assuming the bleachers are empty -if we add spectators in bleachers at same time I'll need to re -calculate exiting provisions. Your welcome John ----- Original Message ----- From: Cruz, Cindi Sent: Monday, September 25, 2006 2:27 PM To: Westfall, John Subject: RE: ECA Gymnasium Fundraiser Event 410 4th Ave N John, Does this mean 412 could occupy the gym at tables and chairs for a served dinner event? The PF[) is also considering a buf f et table event and would that make a dif f erence in occupancy? Frankly I don't think there would be that many attendees but they need to know what the maximum amount they could have. Thank you. Cindi Cruz Executive Assistant City of Edmonds Community Services Department 425-775-7724 cruz(Pci. eamonas. wo. us ----- Original Message ----- From: Westfall, John Sent: Wednesday, September 20, 2006 11:27 AM To: Cruz, Cindi Cc: Graf, Jeannine Subject: ECA Gymnasium Fundraiser Event 410 4th Ave N Cindi: Westfall, John From: Cruz, Cindi Sent: Wednesday, September 20, 2006 11:33 AM To: Westfall, John Cc: Graf, Jeannine Subject: RE: ECA Gymnasium Fundraiser Event 410 4th Ave N This would be for their grand opening event in January so all conditions should be addressed. Thank you very much. Cindi Cruz Executive Assistant City of Edmonds Community Services Department 425-775-7724 cruzGcileamonas. waus ----- Original Message ----- From: Westfall, John Sent: Wednesday, September 20, 2006 11:27 AM To: Cruz, Cindi Cc: Graf, Jeannine Subject: ECA Gymnasium Fundraiser Event 410 4th Ave N Cindi: Regarding the dinner fundraiser in the gymnasium... Please assure that all Fire Dept and Bldg Dept conditions for the TCO are being addressed. There is an open permit in this area and this is still viewed as a construction area. Fire Dept requires: -fire safety and evacuation plan for the facility prior to any events. See Mr. Jim Petosa. -illuminated exit signs with backup and emergency illumination in BOH assembly areas over 50 occupant load as discussed on 9/15/06. -fire permit and pre -event inspection for FD approval of specific event, plans and conditions given this is not a normal use for the gymnasium area. -Seating/furniture plan with aisles and temporary seating arrangements -Plans and exits must accommodate the entire number of occupants. -Serving alcohol? -fire watch is required and WSLCB permit. BUILDING: (Calculations from current open plans: Building Dept / Table 1004.1.2 occupant load is 124 on the Gymnasium floor calculated at 50 factor I FC 1004.2 allows OL increase no greater than (15 net floor factor for unconcentrated (tables and chairs) OL factor as event is described. 6175 s.f. / 15 = 412 occupants) John 425 771-0213 of the floor area, or it area is sprinKierea ana is IeSS Man _I,L)L)U D.F., U1 11 air-O 13 IC33 Mail 1,VVV S.F. (Table 302.1 .1 footnote, 2002 Supplemental). Storage room 134 off the Green RoomlWardrobe is in this category. -2� Accessory Use Areas: fire barrier not required if not more than 10% of floor or more than tabulated value of height/area for such use (302.2). Lohby Storage (478 S.F.) and Gymnasium Storage (434 S.F.) are in this category. Total Building Area 4-8,388 sq. ft. includes theater and gymnasium, excludes music building. OCCUPANT LOAD: (from Table 1004.1.2) ARWLOCATION/NAME MAX, ALLOWANCE/OCCUP.__J_ PROJECT FLOOR �REA TOTAL OCCUPANTS FIRST FLOOR: ORCHESTRA LEVEL Lobby Non -simultaneous use with Auditorium 2,535 Box Office 100 gross 52 1 Concessions 100 gross 54 1 Lobby Storage Auditorium 300 gross fixed seats 478 n/a 2 dd 4K:3q� Stage Orchestra Pit 15 net 7 net 1,957 310 130 Dressing Rooms (2) Small 50 net 130+131 (2) 3: Dressing Rooms (2) Large 50 net 894+873 (2) 18--* Green Room 7 net 1,058 151 Women's Lockers 50 gross 1.017 21 Gymnasium 50 gross 6,175 124 Gymnasium Storage 300 gross 434 2 Men's Lockers 50 gross 1,332 27 Total Arst Floor Occupancy Load SECOND FLOOR: BALCONY LEVEL UpperLobby Non -simultaneous use with Balcon 628 Stair 2 Vestibule Non -simultaneous use with Balcony 197 Balcony (includes Side Boxes) ixed seats - n/a Lighting ko-om 100 gross 138 2 Administration/Offices 100 gross 1,465 15 Meeting Room 7 net 1,526 218 Platform 15 net 272 18 Meeting Room Ancillary Spaces 100 gross 861 9 Rehearsal 15 net 984 59 North Gymnasium Bleachers 1.5 lineal foot 306.5 L.F. 205 South Gymnasium Bleachers 1.5 lineal foot 466.5 L.F. 311 Total Second Roor Occupancy Load 1,156 Total Building Occupancy Load pit when open; 20 fixed seats when pit is covered. ifications are not required under sections 504 and 508 !ZVI 7/ P#- W Z/ 1112— / z 3 5— \ 50 6tw"I'5z�2- (5) pe, 00X 0-5:* 3 1�, 0111"A'A Westfall,John- From: Westfall, John Sent: Wednesday, September 20, 2006 12:13 PM To: Smith, Mike; Bullis, Ann Cc: Harrison, Marie Subject: ECA Certificate of Occupancy Conditions for Fire Dept Mike & Ann: The Phase A permit can be approved with your witness -please verify the following punchlist items. Emergency illumination in Stair 4. Verify operation of both lamps for both emergency illumination fixtures in lobby. Verify 4" FDC on 4th & Daley Provide sprinkler access for BOH as discussed. Verify Flame resistance NFPA 701 of decoration s/proscen iu rn curtain. Verify occupant load signage Final walkthrough items... The Phase A permit can be approved under the following -Establish Fire Prevention Program Superintendent in writing and provide 24 hour contact information who will assume responsibility for all facility activities and the safety thereunder (see IFC Section 1408). -Fire safety and evacuation plan will be provided prior to first event in either theater or gymnasium. See Mr. Jim Petosa. -Provide illuminated exit signs with backup and emergency illumination in BOH assembly areas over 50 occupantload as discussed on 9/15/06 prior to first theater event. John C/I L P90-0 10!f 49 lip/ /PICE7-/lV,4 hp,&'/"j 9�� erg , J 601015)z, CIRC441r-, 9VCfYZ073r IMOC. 4A(K ION J-1— FWICW" &-X/'f,77lVf, PAWKI- - /.5 Ir 7z cope ? lvoce,-17- cowb "t r YCF;we �ewxl— )$Anf84g- Z/6wrz M/4e-ogs 6,0W66wr AW A 4,*,,7 4, 77-40e&'�O ON Os' 6VIM -t---YtS77w4 9/,4 d. 4x 7-2:) /&e7- S rr"e- 4-441 OW7N CWvU/ 4f &7,"ao�r ot-"rmfl 72) kse- eq,,j4l�,Vc <grfx..n 41 cis (e, " ekMY 1,-J F-ROAIT 01101?d�- e0atj A/� 0 IS77(&W Ilf gt=6 774,0' —R.eMf.7VK1 W 71,eUr/44V7�,& ,tl 0#01 loro 7—lixc , W Wesffall, John From: Smith, Mike Sent: Thursday, September 07, 2006 8:42 AM To: Fire Dept Group Subject: Senior Center 220 Railroad Ave/Center for the�s 410 =4thAve N The long awaited install of the new automatic fire alarm will begin today at the Senior Center. Due to the amount of people in the building during normal business hours install crews may be working a swing/graveyard shift during the install. This is just an FYI if you respond to an alarm in the wee hours of the night/morning. I will advise when the new alarm is complete. T6morf6w -(9-8-06) fire finals on phase -one Will be completed on the Center for the Arts. The automatic fire alarm and fire sprinkler will be, active. -The FDC on the North side of the building at 6th and Glen is the one you want to pump into at this 11-,time-_(the FDC at 4th and Daley is-not,active at this time). �.-I-anticipate moving t - he -FD LkBx-fro-m thelfence'to_the� North side entry off the 6th and plen parking lot. The fire panel is just inside the this entry-do-6'r (addressable system with graphic enunciator).- Other doors of importance -will be labeled. More info on - this-b6l(ding will follcw.'_�'_ If you have -hot been in theremodeled area you should stop by and visit (check in at the const. trailer -and tell Darryl). The place is really nice. I ' 10 � Date: To: From: Subject: September 6, 2006 Stephen Clifton, Community Services Director Jeannine Graf, Building Official FM Westfall .Edmonds Center for the Arts 410 4 th Ave N. Hazard Posting I was performing field inspections at Edmonds Center for Arts and trying to identify sprinkler piping to the Music Building. I entered the building and discovered a crew at work pulling floor tiles and removing risers from the CHORAL room. The supervisor, Jeff, introduced himself as an employee of the ECA and described his work there in clearing room for a shipment of furniture requiring a storage area. He was clearing an area for storing these items. I explained to him that demolition work as such required permits requiring City approvals. I asked him to let GC Darrell from Sellen Construction know, who were unaffiliated with this work. I directed him to close the door and not to disturb any more tiles and seal the door by visqueen suspecting airborne asbestos release from the tiles. I posted the building YELLOW identifying the hazardous room inside -alerting those that enter to the potential hazards inside. I posted the CHORAL room RED directing all occupants to stay out of the room until a proper evaluation can be made and Puget Sound Clean Air mitigation and abatement as required. -AA e-one %�In- City of Edmonds Sb Fire Marshal Ff- LUMITSTO V T�, MY OF No$ 7 A Music inc Entryfrq_T Glen St 7`77 Choral Room (clear visqueen will be installed around door). Message Wesffall, John Page I of I From: Westfall, John Sent: Tuesday, May 09, 2006 8:46 AM To: 'Bullis, Ann' Subject: FW: Edmonds Center for the arts - Ann: What are your thoughts on the work extension? Do you have any issues with starting work behind the backstage wall? John ----- Original Message ----- From: Karl Pihl [mailto:kpihl@Sparling.com] Sent: Tuesday, May 09, 2006 7:12 AM To: Westfall, John Subject: Edmonds Center for the arts John The public facilities district has asked us to look at what would be involved in adding additional power and data outlets at level 2 of the Edmonds Center of the Arts building. As you will recall you had agreed that we did not need to extend the fire alarm system coverage to areas east of the stage wall (gridline 6) on the plans as this was a future area of work and would be upgraded at the time the phase B work was completed. Given that this is new work in this area I would like to confirm with you what you will require for fire alarm in this area. I thought it might be helpful to meet out on site with you and show you the area they are talking about and get your direction on what -you would want to see for additional coverage. I was hoping we could meet next Monday May 15th around 1 Oam. Would this work for you? Karl Pihl Associate SPARLING. 206/224-3605—Direct 206/755-8537-Mobi/e www.sparling.com 5/9/2006 41)/ 4VU0 Z)4 ANDERSON SPECIALTIES PAGE 01/06 ANDERSON SPECIALTIES, LLC 16517 Shore Drive N.E. - Seattle, WA 98155 Phone: (208) 368-9722 Fax: (206) 368-7790 FAX TRANSHMAL March 23, 2006 To: Sellen Attn: Josh 425-697-5786 Subject: Bilco Acoustical vents Here is a faxed copy of the same submittal you have fbr the trio of Bilco acoustical vents. nese NEED to be signed off prior to fabrication by Sellen. Please approve and fax back to me so I can, get hem to the proper department. Also find some additional info on rigging acoustical vents for Stagezraft. Pretty basic stuff The only catch is that fbr acoustical units IWO winches are required for each vent due to top and bottom covers. Your units (per spec) use the wall mounted flise link only Thermolatch- The mounting location can be just about anywhere, but needs at least twenty feet of cable pay -out, Using this info, Stagecraft can give you some sort of fair idea of the amount of cable and assorted pulleys to order (they probably have a local source as well). The winches are, in essence, just boat trailer style winches, Nothing super fancy, and usuaVy mounted somewhere on the stage along with, your curtain operators, etc. If Stagecraft has any questions, go ahead and have them give me a call. REVIEWED Eric A- Peterson ,P-ric- Oqander�; apccialtiesc�L FOR COCROINATION AND CCNFORMANCE, WIT.4 CCRRIE',�'TIONS NOTEo. THIS AEVi- '=W DOES NOT RELIEVE THE SUBCONTRACTOR OR MATE.91AL of pages SUPPLIERa . ROM RESPONSIBILITY FOR E.qRORS OR DEVIATIONS FRO�M DRAWINGS & SPECIFICATiONS. SELLE.14 CONSTRUCTION C0.1 INC. GC"CM R"-C-5-71VED U L, 113 2006 C? F x L -1*-T' ,— .. RAY[ ceow, (2134J -JP;] F=74 P] P r—A Z.- V. C cc ir— :1-1: -171 WV114 OIL W-Wa UD RYA14f; M9Y#33&jff 111_�:XSFN ,or XIAI�az 1*11i -3)'M NOTE FOR qkGC4Xr W�EWATIE SEE Wir ACDSH-761 -1 i,-x aA sm --w FS W - — - — - — - — - - VUELE CE ou P-ILEY T/ %vaZI LM -W1% rMAX C: (1) im m Ulf NaTE -P-CA-1: WWL MLT1 BE EWtO AF MAD 13 FL My ;RUA ox via rb Aaow MiN ci-- L P1,1017 (a FU-U "" RC OWERS T)9rk 1190r. 93401AM AFPROX CAM 2MR of W05 AGID to cm,410i EAQO PAR -T QKP mma WCED H) Off MCH FL.KE WAW- Of MCO HOLLATIM Tr GTIM Rob, ime-s HMM17- PLm �WL am vm —C.MLY M watzo -UZ —cmw� .2.xm m w )Mw: om anol MIMI os� 3) jr,13%s IMSVJkL &I/UM 34,�,k 5jM1 RewNw 4 SPECIFIC4 77ONS 1. rrUM4 14 Gauge, P-& Gal-L Steel W/ *QP 443h64 (cwneFa bAy oralded) & curb lintr 2. Co-" 14 Ccutg. P-B. Gat, Si -A I COW liflcr 22 G,,g2 P.B, C.,I, SjW 4. Continuois EPOM qa*et 5. I'Mc hinic, & *ing fiffing MOCkOHISM IC(30) 30(4FO) 7. 1' Figid Ebemlan'baulation & fixod cantar drarm 9- 10, 111. Nun guide back-t 12- Glam fiber cover 5nsulation I" thick 13. Guide arm 1 4. 15. W Shock obsorbar 17- I& oldv fla"q 3ystem 1% I/f I V pdysdb= 21. Gana= anw Nth 114r di 2Z tCWW COW 14 GWg% P.dL Gd-� Sledl (th" 23. 1— ther 22 Gaig. P-i. Gj, Sim pop r�w) MENM HEIL 3 CO. 5PkM5 9 71 1/2- CW n-f T-jr 9DE :0- 5P&MS 9 Z2 I/B- M UE r-r HNGE ME 'n i� CM. AL*-�rft HQU3 (AILCHCM BMTS BY OTHERS) R(LS PRODUCT IS DESIGNED POR INSTALLATM C" A HORIZOKTAL (OR HEAR HCRIZCNTAL) SURFACE 0 WOT(S) REQUIRED SHCP FINI%L- COVER: RED OMOE P51MER FRAIW-- RED a)al]E PfiJlAER Lj0Y#ER CO%ERS RZO CA0E P,-;JMER "AROMARE., Zlf(C PLA-1ED & CHROMATE SEALED !2ffLWff-- SELLEM WiSIRUCnO.14 P 0 BOX 9970 SEATULE WA SaIG9 P12 N* 1LETVM CF '-'4M4T A2&- MYCHUS GENTM FOR ME X:tTS NWE--?SCH 5PEaALvEs CD w t'.) w CD CS3 (n CD 01 ill 11) CD C-1 w Cr) Q) LD CD m ;0 (n 0 z W U m m In WmFwtwan of Doon for 50� Swktg -0 A%� D IHE BILCO CCFjPAj1Y M fiew 1'—. Q—=1iq 054503 m AUMMATIC AIDOUSICAL nRE 'WHT TYPE AcaW-604 sim V-0- x r-O- C;3 Ili alls. Dand, ILI- ftL -- 22-05 I= CD �AC D 5 H�- A 41905 00 NffT SCALIE 761 1 OA� y v&, �e4 !)A �-Es ONUC. P.C.05"- 7rl 13 41 e c= (7) 0 M C= C= C7) Oale New Release Mi 4 catsmncit p a Box 9970 SEATTLE WA 98109 PO N' —ITUR Or Cauff AW -OWCfIQS CENTER FCR ME ARTS APIDERSCH 9'ECIALnES wonfirotban of go" kr S"dd sw%b" TK EKLOO CULPANY MEMO- a N- H—. 0—wlFwt C650 ALUTOMATIC ACOUSTICAL FIRE �"Ir DPE AM511-20 SIZE T-O- 4 7'-0- KCD 11-22 4 41,9051 ma'T SCALE 03/23/2006 09:54 2063687790 FU NAKrg! -10ti—FaU003 Nru/01 0 `M- r. � � M � COAL tm 9 DA TA SHEE, ANDERSON SPECIALTIES PAGE 04/06 RIGGED ACOUSTICAL FIRE VENTS 0 5WIVEL EYE PULLEY (TYPICAL 2-0 FT limum WALL MOUNTED WINCHES R-OF C V� QL 4) KSFUSIBLE UNK R 7r-CEWED J U L 1 3 2006 BUILDING DEPT'. ANDERSON SPECIALTIES 16517 Shore Drive N.E. Uaffle, WA 913155 13-6 0 . - I 03/23/20@G 09:54 2063G87790 FLE NAME: T05-MCM.Mil o5lium T r= T'= C, HoMm'o A L [12A TA SHEEE7 24r LAP LIN' K SD 24-1 ANDERSON SPECIALTIES RIOC31NG RELEASE PARTS SIDE PULLE 51) 13-93 MALLEABLE EYE BRACKET SO 59- p PAGE 05/OG id- SWIVEL EYE PULI-EY SD IAZA- J U L 13 2006 BUILDINC 3 [)Ep-T-,� COVER MOUNTED RIGGING RELEA�E GO 1(681A 13-12 03/23/2006 09:54 2063687790 ANDERSON SPECIALTIES PAGE 06/06 New Improved Brake Winches • Double Brake Reliability. Double -Disc brake system on models K2550, K2505. and K1550, • Improved Braking System featured an K1550 and K25SO. 0 Load-Lok Rutoma6c; disc broke system on the K1051 and 1<650. 0 Automatic broke action designed to prevent heavy . equipment or loads from failing. . 0 Simple to use — just turn the handle to crank. Never wo" about engaging the ratchet. 0 Cable pays out on K1051, KISSOanclK2S50, Aflarload has been lowered, continued cranking of the w*inch will allow cable still on drum to feed out automatically. 0 Ideal for boat lifts and dsvtts where cable payout is necessary to free slings from boat in water, 0 Meets indu2try standards, like FIFI specifications (ASAE S361.1T) for Ponable supers and convoyors, 0 4:1 safety factor in capacity ratings (excluding cable) & Drum hub is 10X recommended cable size to prevent cable damage. • Easy cranking — within handle effort specifications. • Zinc plated for improved corrosion protection. • Installation and operating instructions included. K1 051 X650 K650 0 600 lbs. maximum raled line pull 0 Direct drive — 1;1 gear ratio 10 Load-Lok automatic disc brake 0 Soll-on handle K1 051 0 1000 lbs. maximum rated line pull 0 4.1:1 gear ratio • Load-Lok disc automatic brake system • Solt -on handle K1550 0 1500 lbs. maximum rated line pull 0 5.1:1 gear ratio 0 Improved Double -Disc 8vtomatic brake system 0 Solt -on handle K2550 0 2500 IbS. maximum rated line pull 0 15.8:1 gear ratio 0 Improved Double -Disc automatic brake system 0 Bolt -on handle K2505 0 Designed for grain bin lack and utility use, not for transport augers. elevators 1FR "E. C E I V E D or permanently hanging loads. 0 Free wheeling knob disconnects broke 3 for fast line pay out when no load is J U L 1 2906 supponed. 0 2SOO lbs. maximum rated line pull. BUILONG DEPT, Dependabilitv from the leadp_r On /*e (msulting 30 January 2006 James Grimes Design Manager Western �;tatis Fire Protection 7102 18(f Ave NE Redmond, WA 98052 RE: Fire Protection Engineering Sprinkler Report Edmonds Center for the Arts Edmonds, Washington Dear Mr. Grimes: Tuazon Engineering, PLLC 4322 NE 70 Street RentDn, WA 98059 425.917.1683 tel 425.917.1705 tax vwwv.tuazon.00 Per your request, I conducted a site visit on 9 January 2006 to review and assess the existing portions of the fire sprinkler systems to be reused for the project. This report provides the results of my investigation and recommendations to prDduce fully functional fire protection systems at the conclusion of the project. Findings The following table and photographs depict the existing conditions of the fire sprinkler systems and an assessment of the conditions in accordance with 2002 NFPA 13, Installation of Sprinider Systems, and 2002 NFPA 25, Inspection, Testing, and Maintenance of Water -Based Fire Protection Systems. Feedman Piping Feedmain piping in the sprinkler systems to be reused is schedule 40 black steel with threaded ftngr. Piping was installed in approximately 1961 making it about 45 years old. Both wet pipe and dry pipe system piping was inspected and found to be in good condition and free of mechanical damage, leakage, and misalignment There is no evidence of corrosion on exterior surfaces and the system is not subject lo harsh corrosive atmospheres or environments. An interior obstruction investigation was completed which showed that there are no internal obstructions that could cause obstructed piping or affect sprinkler operation. No significant tubercules or slime was found. Microbiologically influenced corrosion does not exist in the feedmain piping. The piping meets NFPA25 requirements. HydraLiricorhydropneumaticflLishin r NERA25is not required or recommended. (-F—igu—re—s Tffr—ou-gW5T— No recommendations. Existing components are acceptable. Branchline Piping Branchline piping in the sprinkler systems to be reused is schedule 40 black steel with threaded fittings. Piping is approximately 45 years old. Piping inspected is in good condition and free of mechanical damage, leakage, and misalignment There is no evidence of corrosion on exterior surfaces and the system is not subject to harsh corrosive atmospheres or environments. An interior obstruction investigation was completed which showed that there are no internal obstructions that could obstruct sprinkler heads. No significant tubercules or slime was found. Microbiologically influenced corrosion does not exist in the feedmain piping. Minimal foreign material in the form of soft mineral deposits was found (Figure 7), but the material would easily be expelled from an activated sprinkler and the condition of the piping meets NFPA 25. Hydn�r Fire Protection Engineer Sprinkler Report Edmonds Center for the Arts 30 January 2006 Page 2 of 6 Fire Sprinkler Component FIRE Assessment hydropneumatic flushing per NFPA 25 is not required or recommended. (Figure 6 and 7) No recommendations. Existing components are acceptable. Sprinklers E)dsting sprinkler heads are 1/2" orifice, standard response, Reliable Model 'C" manufactured in 1961. The project scope of work includes replacement of all wdstirig sprinkler heads with new W orifice, quick response sprinklers to match existing sprinkler characteristics. Sprinklers in the gymnasium are subject to mechanical damage but are not currently provided with head guards. See recommendations section. Fitfings Existing fittings are threaded cast iron with some grooved fillings in feedmain piping. Fittings are in good condition with no leakage, corrosion, or misalignment noted. No recommendations. Existing components are acceptable. Valves The project scope of work includes removal of original sprinkler control valves and replacement with new valves and components meeting current NFPA 13 requirements. All control valves had been removed at the time of this visit Existing drain valves to remain were reviewed and found to be in generally good condition. No recommendations. Existing drain valves are acceptable. All other valves will be replaced with new. Gauges The project scope of work includes removal of original gauges and replacement with new gauges meeting current NFPA 13 requirements. AJI gauges had been removed at the time of this visit No recommendations. Existing components will be replaced with now. Hangars Existing pipe hangars consist of threaded steel rod with pipe rings or clevis-type hangars. Hangars are in good condition with no loose or damaged components observed. No recommendations. Existing components are acceptable. Bracing Existing seismic bracing does not meetthe current requirements of 2002 NFPA 13 for type (lateral, longitWinal), locations, or components. However, it appears that the bracing provided met the code requirements. at the firne of oonstructon. See recommendations section. Fasteners and Structural Existing fasteners and structural connections appear to be in good condition Connection Points with no loose or damaged components observed. There are no deficiencies noted, however a full structural analysis was not performed. No recommendations. Existing structural components are assumed to be functionally acceptable. A structural analysis is not required by Section 16300. Fire Protection Engineer Sprinkler Report Edmonds Center for the -Arts 30 January 2006 Page 3 of 6 Figure 1. Feedmain Piping (Wet System) Figure 3. Feedmain Piping (Dry System/Stage) Fire Protection Engineer Sprinkler Report Edmonds Center for the Arts 30 January 2006 Page 4 of 6 Figure 4. Feedmain Piping (Dry Systern/Orchestra) Fire Protection Engineer Sprinkler Report Edmonds Center for the Arts 30 January 2006 Page 5 of 6 Figure 7. Br-anchline Piping Recommendations The following recommendations are provided as a result of this investigation. I . Seismic Bracing. Seismic bracing in accordance with 2002 NFPA 13 should be considered and provided for all the existing wet and dry system that will be reused. The existing seismic braces do not use UL listed components and the spacing of the braces do not comply with NFPA 13. They may not provide have sufficient strength to resist the seismic loads during an earthquake, resulting in possible pipe breakage, water damage, and impairment of fire protection systems. 2. Hydraulic Calculations. The existing sprinkler systems were designed using the pipe schedule method. NFPA 13 requires new systems be designed using hydraulic calculations. It is recommended that the existing dry pipe and wet pipe systems to remain be hydraulically calculated to ensure adequate water density is provided to control a fire event. 3. Restraint of Branchlines. Sprig -ups 4 feet or longer should be restrained against lateral movement in accordance with 2002 NFPA 13 Section 9.3.6.5. Discrepancies exist at the three (3) 2nd floor corridor skylights and the four (4) Gymnasium skylights. 4. Sprinkler Head Guards. Sprinkler guards should be provided for all sprinklers in the Gymnasium in accordance with 2002 NFPA 13 Section 9.2.8. 5. Dry Pipe System In Heated Areas. The second floor system is a dry pipe system and appears to protect mostly heated areas. If all the areas protected by the system are maintained at or above 40 degrees F (reference 2002 NFPA 13 Section 7.6.1.3.2), conversion of the system to a wet pipe system is recommended to improve water delivery time and reduce maintenance. 6. Hydrostatic Testing. The existing sprinkler systems to be reused should be hydrostatically tested after completion of all work in accordance with 2002 NFPA 25 Section 5.4.3 and 2002 NFPA 13 Section 16.2. 1. Fire Protection Engineer Sprinkler Report Edmonds Center for the Arts 30 January 2006 Page 6 of 6 Please contact me at 425-917-1683 or edcOAuazon.com with any questions or concerns regarding this report, RespecOully, TUAZON ENGINEERINq PILILC P Eric P. Tuazon, PE Fire Protection Engineer P!cP� C K P j k\VA �S&4 �y S -Z 4AL &7 In 7" " I wM 1/ 12 f 2^77 1 Message Wesffall, John Pagel of2 From: Westfall, John Sent: Tuesday, February 07, 2006 5:08 PM To: 'James Grimes' Cc: Tomberg, Thomas; Smith, Mike. Subject: RE: Edmond Center for the Arts I see no problems with this assembly. 1) Make your changes to the fire connection submittal. 2) Callout groove joining methods for ductile pipe attachment. Inspection required before backfill. 3) Show pipe clearance where passing through floor (NFPA 13 6-4.4) John Westfall Edmonds Fire Marshal 425 771-0213 ----- Original Message ----- From: James Grimes [mailto:james.grimes@wsfp.us] Sent: Tuesday, February 07, 2006 9:21 AM To: Westfall, John Cc: Smith, Mike Subject: FW: Edmond Center for the Arts From: Tomberg, Thomas [mailto:tomberg@ci.edmonds.wa.us] Sent: Tuesday, February 07, 2006 9:15 AM To: james.grimes@wsfp.us Cc: Westfall, John; Smith, Mike Subject: FW: Edmond Center for the Arts 2/7/06 In order to receive a prompt response, please forward your questions to Fire Marshal John Westfall at westfall(d-ci.edmonds.wa.us and/or Fire Inspector Mike Smith at smithm�D-ci.edmonds.wa.us. T They can be reached by phone at 425-771-0213 or 425-771-0301, respectively. Thanks. TT ----- Original Message ----- From: James Grimes [mailto:james.grimes@wsfp.us] Sent: Tuesday, February 07, 2006 9:04 AM To: Tomberg, Thomas Subject: Edmond Center for the Arts Is it ok to use a 6" Stainless Steel IBR for the 5'-0" stub into the building? See attached cut sheet. The Architect LIVIN and CDI Engineers has approved the IBR. Western States Fire Protection, Inc. 7102 180th Ave NE Suite A-105 Redmond, WA 98052 Office Phone 425.881.0100 Office Fax 425.881.3030 Cell 425.736.8208 James N. Grimes (Jim) Design Manager 2/7/2006 ES-A-InBuildingRiser FOR COORD INATION AND CONFORMANCE, VM CORREMONS kOTED, THIS REVIEW DOES NOT RELIEVE THE SUBCONTRACTOR OR MATERML A Sen*es IBR SUPPLIER FROM RESPONSIBILITY FOR ERRORS OR A M E: S In-Bading Risers DkVIATIONSFROM. ORANNGS8SPECIMA1095. nRK&WATCRWOR" SELLEN CO=AUCTM CO., 1XC- Sizes: 4" - 10" (102 - 250MM) E C - , � !,) Mi NGINEERS - SUBMITTAL REVIEW of submMlls is for general conformance only with the oncept of the ptoloc�t ard general ,caipfiance with the !cin g iven in the contract docuni action shown Is Me req,.,1r111r1ar9s Othe plans DrI 5p2c�licaticns The Building Floor Building perimeter wall )T is I`Vporllofe tr aim-micits, ivrii:h �Pai� bs confirmed 4ateo at,*t:e ],,b site's fetncatior .i5es ar,el T _7 Xtion; Coordination o'bis work if a:1 other tnjes: ii 0 0 F, G 0 Z 0 77 7 7 TM7V 31isfactory pdomance of his work Excel,ticits Takei Approved as Noted 01 19 1 vise and Resutm� Not A;prcved Fteviewed 0 Fzbvitiwed CL 02te: Flow Feattims • Cost savings • Corrosion resistant stainless steel construction, type 304SST • Ease of installabon and light weight allows one person to position and handle the riser • Minimal site preparation; joint restraint one-piece construction reduces time and labor; no missing parts, no leaks; easily idenbfiable for approvals * ULJFM approved • Sizes: available in 4" — 10' (100-250mm) with various lengths to meet all local requirements • Designed to meet NFPA 24 Section 8-3.2 • AWWA C900 Inlet/DIP • AWWA C606 Outlet Sedes IBR In -Building Risers are used to connect the main fire supply to the building overhead fire system. The fitting passes under the foundation without joints and extends up through the floor. Provided with installation tabs, the unit has a CIPS (Cast Iron Pipe Size) coupler for easy connec- tion to the underground supply (AMA C900 PVC and Ductile Iron Pipe) and industry standard grooved -end connection (AWWA C606) on the building side for easy connection to the overhead fire sprinkler system. Ames In -Building Risers are precision engineered and manufactured to provide exceptional reliability and reduce installation time & labor costs associated with field assembly. In accordance with NFPA-24, the UUFM approved In -Building Risers replace numerous fittings, elbows & spools and reduces the possibility of leaks or failure in comparison to traditional installation methods and materials. Factory tested integrity ensures the highest quality installation.. The use of stainless steel significantly increas- es the reliability and life of the riser, Job Name —EDMONDS CENTER FOR ARTS —Contractor Westeirilt States Fh-e 11"t-otection Inc. JobLocation 6th&DALEYSTREET _Approval UL LISTED & FM APPROVED Engineer Contractot *s P.O. No. Appoval Representative Ams pfoduct SM41calions; in US. cLatoimry units and mairic areapproximate and areprovidedloi refereri krpreciso rineasurerneft please Service. Ames reseries the fight to change of modify pioduci destgfi, constfuction, Specifications, or rnaterals Withotil prior notice and without tricurr4V any obligation to make such charga and modifications on knes profticts previomly of subwUnmig $oK www.amesfirewater.com Series SS Riser In -Building Riser SiZes: 4" — 10' (100 — 250mm) * Installation For technical assistance, contact your local Arnes representative. IMPORTANT- Inquire with governing authorities for local Installation requirements. Lintited Warranty: Ames Company warrants each product to be free from defects in material and workmanship under normal usage for a period of one year from the date of original shipmenL In the event of such defects within the warranty period. the Company will, at its option, replace or recondition the product without charge. This shall constitute the sole and exclusive remedy for breach of warranty, and the Company shall not be responsible for any incidental, special or consequential damages. including without limitation, lost profits or the cost of repairing or replacing other property which is damaged if this product does not work pfopedy, other costs resulting from labor charges, delays, vandalism, negligence, fouling caused by foreign material, damage from adverse water coidi0ons, chemical. or arry other circumstances over which the Company has no control. This warranty shall be invalidated by any abuse. misuse. misapplication or improper installation of the product. THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Any implied warranties that are imposed by law are limited in duration to one year. RPAS-A-SSRiser Some States do not allow limitations an how long an implied warranty lasts, and some States do not allow the exclusion or limitation of incidental or consequential damages. Therefore the above limitations may not apply to you, This Limited Warranty gives you specific legal rights, and you may have other rights that vary from Wts-lb State. You should consult applicable state laws to determine your rights. CALIFORNIA PROPOSITION 65 WARNING WARNING- This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. (California law reguires this warning to be given tocustomersin e State of California) For more latomatloo: www.wattxIad.comtpmp85 A A Division of Walls Pegulator Company www.amesfirewater.com AM ES 1427 North Market Blvd. * Suite 09 * Sacramento, CA 95834 * Phone: 916-92"123 * Fax: 916-928-9333 FIRE &WATERWORKS7" a Basic Installation Instructions Ames Company in -building risers are designed for easy installation In standard configurations as outlined using standard construction method. The floor penetration detail of the in -building riser shall be restrained per �Iirection outlined by site plans. Consult Link Bell handbook of PVC pipe if instructions are not provided. The below ground connection is a standard AWWA C900 gasketed coupler (either ductile iron or PVC). Installation in accordance with the following information (from Uni-Bell handbook). I � Clean out inside Of Coupler making certain the breveled spigot end and the gasket groove are free of dirt. 2. Apply lubricant to beveled spigot (male). Z5 3. Insert gasket into coupling groove and seat firmly. 4) E 4. Push lubricated end past gasket into the bell housing. (Ames in -building risers are equipped with the lugs placed 0 0 21 1800 apart on either side of the unit which can be used to Grooved End the pipe into the bell using a "come a -long" type equipment Also, the 'bar and block method described in the Uni-Bell handbook can also be used for installation). Buildin 9 The above ground connection is an AWWA specification C606 Floor groove. All underwriters Laboratory approved groove couplers CIPS 00' C hnq Couplings m ade to fit the AMA C606 grooves can be used to join the ... connection to the in -building supply line. Flow 1. Check gasket and lubricate it using groove ci-jupler manu- Tie -Rod Bracket fachirer's recommended lubricant or approved equal. 2. Install gasket, Place gasket over Ope end being sure gasket lip does not overhang pipe end. 3. Align and bring two pipe ends together and slide gasket into position centered between grooves or each pipe (no portion of the gasket should extend into the groove of either pipe.) 4� Apply housings. Place housings over gasket, being sure the housir�g keys engage into the grooves of the pipe. (No por- ton of the gasket should extend into the groove of either pipe.) 5� If restraint fitting is being used tighten nuts: Tighten nuts alternately and equally until housing bolt pads are firmly together metal to metaL Uneven tightening will cause gasket to pinch. IMPOWANT: Inquire with governing authorities for local installation requirements. ATTN. INSTALLER: After Installation. please leave this instruction shoot for occupant's information. K Specifications Standards In -Building Riser shall be installed as indicated on the NFPA — Designed to allow the contractor to conform plans. Riser shall be composed of a single extended to NFPA 24 Section 8-3.2: 90 deciree fittina of fabricated 304 stainless steel tub- Where a riser Js close to building found . ations, under- ing, maximum working pressure 200psi (14 bar). The ground fittings of proper design and type shall be used fitting shall have a grooved -end connection on the to avoid pipe joints being located under the founda- outlet (building) side and a CIPS coupler on the inlet tions. (underground) side. The In -Building Riser shall be an NFPA — 24, . 7.1.1, 1 8-3.4 Ames Fire & Waterworks Series IBR. End Connections: Approvals Horizontal End: Mates with Ductile Iron Pipe and Fittings FM class 1920 AWWA Q900 Pipe (PVC Pipe with Ductile Iron Pipe UL (HKQA) (4"-10') Equivalent OD's) 4S> IS Utilizes Gasket conforming to UL 157 with 'Lock in" gasket configuration Dimensions — Weij4hts H * A 'qr­� Grooved End (Flange Optional) CIPS Coupling Too -Rod Bracket NUMM ia MM A (01)) _ M) ip rZM 76!6114 a ft. CM ft c CM 102 4 4 6 1 6 183 71 32 —4 — 6 150 67 6 183 98 44 8 200 1 WA 114 6 6--in-4-M 59 10 250 1 103/� 114 6 1 V 6 183 1202 92 Consult factory to( custom log dimensions. MQ�ECZEM ft MM #11 MM 4 102 C80 In 6 150 6.90 175 8 200 105 230 10 250 1 11.10 282 'Vertical End: Meets AWWA C-606 dimensions for roll grooved pipe Meets AWWA C-207 class D for flanges Ratin Y, Meets &A C-900 pressure class 200, DR 14 Pipe Testing Welds are 100% leak,tested at the factory JA MM PSI bV 4 7111-1VIWINAV 102 1000 70 ­6 150 1000 70 8 200 800 56 10 250 8W 56 Inquire with governing authorities for A local installation requirernents. A M E 5 rM9&VVATffR"RK6 A Division of Watts Peguiator Company www.amesfirewater.com 1427 North Market Blvd. 9 Suite #9 * Sacramento, CA 95834 Phone: 916-928-0123 9 Fax: 916-928-9333 ES-A-InSuildingRiser 0536 (DAn*s Fire & Waterworks 2005 D RECEIVED ATE CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWN ME/NAME OF BUSINESS rcnnn PERMIT NUMBER g:�yz��z 4=— BDIVISION NO. OT NO. LID . 0 LID FEE $ MAILINGqDRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved 13 Rw Permit Required Street Use Permit Req'd 8 CITY ZIP I ��) fo or dt S TELEPHONE EXISTING - PROPOSED REQUIRED DEDICATION- FT Inspection Required 13 Sidewalk Required 13 Underground Wiring required E3 x NAME METER SIZE LINE SIZE OF FIXTURES PRV REQUIRED YES C3 NO 13 z z ADDRESS rinl!! n0v REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE -Z CITY F 16 I I FIRE MARSHAL IIWIW NAME CBL# �JAUST BE PRESENT r,A Vf r 00 fil_n7/7t (7aii Y6 FOR ENGINEf" ?`(tv1%ELBYREM0VAL. OR CAP DATE ADDRESS tv cc 0 F . IRE REVIEWED BY DATE 1 1 U. 0 0 C, P 1 90, TELEPI46NE 40- VARIANCE OR CU SHOP ELINE OR AD I JOYES INSPECTION REO'D ONO BOND POSTED $ STATE LICENSE NUMBER EXPIRATION DATE P,IQ V -7 (90 PCKEUY. BEIRA REVIEW tOMPLETE , EXEMPT kxp SIGN AREA ALLOWED. PROPOSED I HEIGHT ALLOWED , PROPOSED .j < A PROPERTY T 'JOUNT PARCEL NO 00 a 0­7ico E] NEW RESIDENTIAL PLUMBING MECH . COMPLIANCE OR ri ADDITION 5311COMMERCIAL 1:1 CHANGE OF USE REMODEL MULTIFAMILY SIGN LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (Fr.) FRONT SIDE REAR PROPOSED SETBACKS (Fr.) FRONT L/R SIDE REAR z z PARKING RE O'D PROVIDE& LOT AREA PLANNING REVIEWED' -BY DATE GRADING FENCE REPAIR CYDS X FT) 'REMARKS DEMOLISH q3TANK OTHER z GARAGE -1 RETAININGWALL �[j. FIRE SPRINKLER CARPORT 13 ROCKERY FIRE ALARM 0 (TYPE "E, BUSINESS OR ACTIV" EXPLAIN: CHECKED BY TYPE,OF C.QNSTRUCTIO OCCUPANT GROUP NUMBER OF STORIES NUMBER OF DWELLIN& UNITS CRITICAL AREAS NUMBER 'SPECIAL INSPECTIOfll� R!26UIRED�.n. Yks"'' I AAEA . OCCUPANT LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPE CTIONS PER UBC 108/IBC109/1RC109 FINAL INSPECTION REO'D TION VALUA Description Description FEE x Plan Check V \\ State Surcharge HEAT!�� GLAZING % 'LOt;SLOPE % b, Buildin Surcharge '�Perrnit city PLAN CHECK NO: VESTED DATE "Ap lumbing Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO It BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIOIEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE Grading SEPARATE PERMISSION. Engr. Review PERMIT APPILICATION: ISODAYS PERMIT LIMIT I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit SU C C E S 0 R S IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF T HE C TY 0 F 0 M A N A N D 2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Receipt 'R ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY R IND E C TL Y FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE HALL NOT B E DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due Y ORDINAN C E L 0 PROVISIO N X1 NOR LIMIT IN ANY WAY THE C17YS ABILITY TO ENFORCE ANY ORDINANCE PROVISION.' Recording Fee Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION INFORMAT ION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application Is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL I BE EMPLOYED CALL Building Official or his/her Deputy; and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION ,-V celpt Is acknowledged In space provided. G WORKMEN'S COhVWAQATI0jMRAN No RCW 18.27. vSIGNA DATE A SIG N 0 DATE SIGNED (d. 9-5) Z, 7 /P MLs 771-022 0 PIATE 7 Wn� Off 1333 ISUNLAVY J TO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCU- ORIGINAL -FILE YELLOW- INSPECTOR PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. PINK -OWNER GOLD -ASSESSOR 09/03 PRESS HARD -YOU ARE MAKING 4 COPIES 1b ENVIRONMENTAL TANK SERVICE, INC. 3260 "B" St. N.W, Suite E, Auburn, WA 98001 Seattle: 1-206-622-6040 Tacoma: 1-253-474-6242 So. King: 1-253-833-4375 FAx: 1-253-939-2898 ENVIR-TS094PU Job No. Job Name Date Subject Sheet —of i. FINAL PROJECT APPROVAL FORM TO: DATE: MEMO TO: PERMIT COORDINATOR, BUILDING DIVISION FROM: -PLEASE SIGN FIRE DEPARTMENT DATE/'& ENGINEERING DIVISION DATE PLEASE SIGN PLANNING DIVISION DATE PLEASE SIGN PROJECT SITE ADDRESS /V PERMIT 6q'�_7 ADB# DATE INSPECTED& — -L ? DESCRIPTION OF WORK TO BE INSPECTED[ I r-cfrLA- 46�ft'_o,�4 A field inspection was. conducted to determine compliance with -approved plans. Final approval denotes that there are no objections from the above signed Department to the release of PERFORMANCE BONDS and the granting of: GRANT FINAL PROJECT APPROVAL GRANT PROJECT APPROVAL WITH CONDITIONS NOTED El Copy of CONDITIONS given to owner/contractor by inspector I . FAILED FINAL INSPECTION - OUTSTANDING ISSUES El Copy of CORRECTION NOTICE given to owner/contractor by inpector I . 2. 3. RE -INSPECTED OUTSTANDING ISSUES - GRANT FINAL PROJECT APPROVAL Date Signature 1: temp: bidg: forms: ocapni 3/25/04 LMNARCHITECTS December 2, 2005 Marie Harflson . Senior Permit Coordinator City of Edmonds 121 50'Avenue North Edmonds, WA 98020 Re.- Edmonds. Centerfor the Arts Project -Construction Phasing Dear Ms. Harrison: This letter is written on the behalf of the Owner in response to a request from Ann Bullis with regard to the scope of the current construction phase. The City has issued Building Permit #2005-0778 for the construction work defined in LMN drawings labeled PERMIT REVISIONS 4- APRIL 2005 / 1 JULY 2005. For construction funding purposes the scope of construction as defined in the permitted drawings has been divided into two phases. The current construction scope is referred to as Phase A and is delineated in a set of drawings labeled BID SET 18 JULY 2005. Phase B construction will be done at an as yet undetermined future time. Attached to this letter are copies of the Life Safety diagrams from the BID SET for your use in understanding the current scope of construction work. Phase A is everything to the west of the 3-hour wall in the diagrams and Phase B is to the east. The initial construction, Phase A, is the renovation of the existing theater building and a small addition on its north side. Also included in this phase is the parking lot north of the theater building. This work will be followed by Phase B that is the renovation of the two-story wing east of the stage house of the theater. Due to the integral nature of the existing building there are some items of work on the Phase B side that will be done in the current phase. Phase B area work to be completed during Phase A is listed below: 1 . The current project includes converting the buildings heating system from steam to hot water. The heating units in the Phase B area will be modified accordingly in the current work. 2. g-.exiging-fire protection system in Phase B will be upgraded as part of Phase Aw 0A to —meetd&rr6nt codes.-) ' Iii i n- -- - 3. P. - a ss e il , riurlp-nominal electrical work in the Phase B area in order to maintain system(s) continuity following the demolition of the existing buildings and to install new exterior lighting at the east and south sides of the Phase B building area. 4-. �Plia-s—e-"6rk-include-s-a-n-ew--fir-i-�-alar-'M-s-Vs--t-e_'m,fo-r't-he-g-y-m6�sium. 5. Plias-e-W War-k I n-clude-s-the I installation of power and-ra-ceway-s for' a future video system in an existing storage room in the Phase B area. 6. Phase A work includes the installation of a new backstage speaker system in the main level dressing areas of Phase B to the east of the stage. Judsen R. MarqQrdt, FAIA John F. Nesholm, FAIA Robert W. Wichiieyer. AIA Mark Recidington, AIA Wall W. Niehoff, Jr.. AIA Christopher J. Esemai i. ALA George H. Loschky. FAA 801 SECOND AVENUE, SUITE 501 SEATTLE, WASHINGTON 98104 206.682.3460 FAX 343.9388 LMNARCHITECTS Marie Harrison City of Edmonds May 5,2005 Page 2 7. Phase A work includes the installation of new signage throughout Phase A and Phase B areas. 8. Phase A work includes the related abatement, demolition and patch and repair work related to the above in the Phase B area. Please let us know if you have any questions about the contents of these documents. Sincerely, Art Haug, A Associate LMN Architects E Enclos u res: P I a ns 1 /Al 00 -L! -SAFEP( — O-R-C l'iESTRA L EVE L 2/Al 00 LIFE SAFETY — BAL-ONY LEVEL L.\Projects\eca\otheA4. AGENCY\Bldg. Code Correctiws\Phasi�g leitter I - 2-2-05.doc A-3 ACCESSORY USE TOILET ROOMS MAIN fXIT I 5OZ OTAL O.L. CAPACITY MIN. F 228 5061 -T-: E28 /�____361 23( A-3 ACCESSORY USE L47.-J' @ A- I OCCUPANCY AUDITORIUM F4 074 A-3 OCCUPANCY LOBBY EEP NON -SIMULTANEOUS USE BY AUDITORIUM OCCUPANT%.'-�' A-3 ACCESSORY USE CONCESSIONS 28 8 OCCUPANCY DRESSING ROOMS PROSCENIOM� &E (-]NON-:RAT PENING 0 0 N 2003 INTERNATIONAL BUILDING CODE (INCLUDING ACCESSIBILITY) MTH STATE AMENOWNTS 2003 INTERNATIONAL MECHANICAL CODE MCLUDING INTERNATIONk FUCL GAS CODE) WITH STATE AMENDMENTS 2003 INTERNATIONAL FIRE -CODE WITH STATE AMENDMENTS 2DG3 UNIFORM PLUMBING CODE ETH STATE AMENDMENTS WASHINGTON STATE ENERGY CODE (WAC 5I.TO WASHINGTON STATE VENTILATION INDOOR AIR GUALITY CODE (WAC t3) ICC/ANSIAU7.1-1998 ACCESSIBLE AND USABLE BUILONGS 90 FACILITIES EDMONDS COMMIJINITY DEVELOPMENT CODED OCCUPANCY CLASSIFICATIM "D USE GROUP A A-1 THEATER, ORCKSTRAIBALCONY A-3 LOBBY SPACES-, WEETING ROOK REHEARSAL A-4 GYMNASIUM GROUP 9 OFFICES 40 DRESSING ROOMS AUDITORUNI/B&CONY NO LOBBY SPACES ARE 14ON-SKLIAICOM USE. CONSTRUCTION TYPE: 18 FK-RESISTK REOUKMENTS STRUCTURAL FRJK: BEARING WALLS' FLOOR ASSEMBLIES: ROOF ASSEMBLES- SHJIFT ENCLOSURES: PERMANENT PARTIT06: FIRE wALL: STAGE SEPARATIONS I-HM NIAKR Or STORIES 2 WITH BUILDING FULLY SPRIO(LEKD 0 2 HOLIR EXTERIIOR * INTERIOR I 0 1 HOUR. WERE CONMALED IHOUR WERE NDTED.OTHERWISE 0 IVATH 3 HOUR OPENING$ A-3 IINCIDENTAL 15±i I - LXII LUAU INLLUULS UCLIPANIS �HUM UALX 2 8 ACCESSORY USE OF HOUSE THROUGH FIRE WALL ON UPPER LE J, r 65 306 A-1 OCCUPANCY STAGE A- I OCCUPANCY COVERED PIT OR ORCHESTRA PIT 6-5 Ij q 8 6 ...... .......... E XIT LOAD INCLUDES OCCUPANTS FROM BACK OF HOUSE THROUGH FIRE WALL OVERHEAD FIRE WALL EXTENSION THROUGH PORCH ROOF 7 - K rl LIFE SAFETY - ORCHESTRA LEVEL SCALE. Vs- - f-0- A-3 ACCESSORY USE NON -SIMULTANEOUS USE BY BALCONY OCCUPANTS NON -SIMULTANEOUS USE BY BALCONY OCCUPANTS BEND FIRE WILL - 3-HIR CONST. - 3-WHR OK"MNM ST.. 199086 OCCUPANICY SEPARATION - I-HR ST. - 60 UK OPENNGS 0 M M Will IIIIII STAGE SEPARATION - I-HR CONST. - 60 MKOPENNGS a a a a a 0 C CORRIDOR WALL - PHR CONST. - 60 MIN, OPENNGS (NOT IBC REWIRED) EXIT PASSAGEWAY - I-HR COKST. - 60 IK OPE"S I.AGE STAIRWAY O'&T �EKCLOSURE 14IR CONST.SEPARAIION - 60 UN.OPENINGS W ROOM MAW 6 OCCLIPANT LOAD ,A r 6-3-1 — OCCUPAICIS USING VOT F226 I — VOT CAPAGITY RlOtIIRE0 BIJILOING'EMS WORK UNDER S SEP � C EPARATE CONTRACT 10TES RAWING INDICATES RaM CODE REGM0 FIRE PATM 8 ACCESSORY USE ELECTRICAL FN—/Al UFE SAFETY - BALCONY LEVEL SCALE: VC - T-0- Wesffall, John From: Westfall, John Sent: Tuesday, November 08, 2005 2:18 PM To: Bullis, Ann Cc: Smith, Mike Subject: Edmonds Center for the Arts 410 4th Av N Stage Vents Ann: I clarified some things for architect Art Haug of LMN. The "automatic" (heat detection) system required to function the stage vents will be fusible link. We don't want the general alarm to open those vents. The sprinklers over stage and ventilator fusible links will be of the same temperature so one automatic system will not negate the other during activation. I think that is 155 degrees F. I am asking for a manual means at the stage floor to open the vents. The spec didn't call this out but the IBC speaks generally regarding the manual opening function. The spec does call out manual closing from inside and manual opening from top/roof. They'll place the well-signed/placarded control on the north end of stage. John 111�;#' 1,47 Y o" tination: :Ory ke a walk into history with ;eries. . Page 27 ite on Sound' vard-winning author kicks inference. Page 30 ,g Out -reek's Zinnia -ultivates ice in new :)n. Page 29 6. Os iors win ,o thriller Edmonds- ,vay football ept its record intact 28-27 victory ,erett. The s missed a vinning field e in the luarter. Page 21 t effort Meadow- :)tball team back from a 7t halftime 5ut still ip losing to Page 21 'Arts for'. Edmonds' sake Event coordinator Jeannie Falls, of I Seattle, ties on a banner (above) and then tests eaisinga flag (right) r to-Wednesday's,gala Ernie!Ling ceremony for the . Egmroundd rId! roounds Center for the Arts..With champagne and Gypsy jazz music, the event kickeif off a year -long $9.8 million renovation of the former Edmonds High School campus that also once housed Puget Sound Christian College Enterprise/CHRIS GOODENOW z�aate whi EdCC ad -on cash i4 Audit says trans were not reliabb By Jennifer J Enter rise 6 The athletic departmE Community College di( record and monitor 9 tr, financial books from Jul, 2004, according to a rep( month by the state Auditot The departmenes reci received $109,296 and $- and 2004, respectively. Thi reliable, according to the transactions may not hav into the accounting syste have been destroyed. Cash collections at E were not always proper4 report stated, as the numb( at 19 of 39 games in the c( could not be verified. No made following eight gam( for 10 other games did n( recorded number of ticket, tor's report said. In addition, the report multiple athletic departm( who were directly involve6 letic organizations, utilizec tions with the college to us ties and Web site. In one ir. were collected for the facilit group operated without a I with the college, according i Susan Kostick, EdCC's for college relations and ad% ognized that n-dstakes hai and the college has implem( "By the time the report 2005, a year later, we alread athletic director in place,� Ki Faimous Hanison took ( director in the fall of 2004, aj controls have been implem, tor accounts and train emplo "Me college has very , about training, cash handhi- however, they're mandator ' employees," Kostick said. Most employees of the a ment are part-time or coach( See E SAVE THE DATE Page I of I Wesffall, John From: Cruz, Cindi Sent: Wednesday, September 21, 2005 10:55 AM To: All City Subject: SAVE THE DATE September 28 2005 You're invited! 'for the Arts Please join us for a groundbreaking celebration for the Edmonds Center for the Arts! Wednesday,, September 28,, 2005 4 p.m., 410 4th Avenue North, Edmonds The contract is signed, the construction fence is up and the Board of the Edmonds Public Facility District invites you to help celebrate the start of the renovation. Look for the tents on the lawn — following a short program, enjoy live music by Pearl Django, a gypsy jazz band playing from 4:30 — 6:00 p.m., and light refreshments. For more information call 425-775-7724 9/21/2005 CITY OF EDMONDS GARY HAAKENSON MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 775-2525 CITY CLERK loc. 1 SO' September 28, 2005 Terry Vehrs Edmonds Public Facilities District 121 5 th Avenue North Edmonds, WA 98020 Subject: Special Event Application Dear Mr. Vehrs: In response to the Special Event Application that you submitted for the "G round breaking" for the Edmonds Center for the Arts, scheduled for Wednesday, September 28, 2005, from 4:00 p.m. to 6:30 p.m., the application has been approved, with the following comments: Engineering Department — (Darrell Smith — 425.771.0220) * A Type III barricade must be installed with "Road Closed" signs. Fire Department — (John Westfall — 425.771.0200) 0 A fire extinguisher is required by the stage: Size 2A1 O:B:C (5 pounds). Any other questions, please feel free to contact me at 425.771-0245. Best wishes for a wonderful event! WA Linda Hynd City Clerk's Office cc: Darrell Smith, Engineering Department urall Fire Department Incorporated August 11, 1890 .q;ctor riti, - RniiinAn -T�"An Class A office building- - will house medical practices and serve as the new headquar- ters- fo # 1, Contributed phot e r-umonuS-based Turning the first scoops of dirt at the ground -breaking for the 76th Avenue Professional Taylor Gregory Butterfield Building Sept. 8 were (from left) Dr. Samuel Seto, Dr. Jane Yong, Lois Broadwa Edmonds (TGB) Architects and Ham- Mayor Gary Haakenson, Dr. Robert Landerholm, Kent Gregory and Brad Butte merWorks Construction Ser- the mayQr are owners/occu Ild. All but vices. - pants of the new Class A building. TGB Architects and Ham- merWorks have been involved in the Despite what Gregory called a "pretty According to the Commercial Bro- design and building of local medical complex laild-use ordeal,, involving a kers Association, the space is being buildings, churches and the downtown contract rezone of adjacent property and offered at $25 per foot, which Gregory. Edmonds Vuilding containing Tullys a request for vacation and subsequent said is approximately the same as and Windermere Real Estate according Purchase from the city of 219th Street, �tevens Pavilion - another Class A build - to architect Kent Gregory. i�e architec- he said project development was rela-' ing - and more than surrounding med- tufal firm also designed Stevens Pavilion tivelY smooth and took about two years icalspace. east of Stevens Hospital. from drawing board to ground -breaking. GVA Kidder Mathews is handling Both the'lot and building are owned Class A buildings usually are of a rela- lease inquiries. by a li ' mited-liability corporation corn- tivelY igh quality, in a desirable location Jennifer Gerend, Edmonds director of posed of Samuel Seto M.D.; Robert Lan- and charge higher rents than Class B economic development, called the build- derholm M.D.; Jane. Yong, D.D.S.; and and C buildings because they cost more ing an important gateway to the medical architects Brad Butterfield, John Taylor, to build and maintain.* corridor anchored by Stevens Hospital. Lois Broadway and Gregory. All the ' 'Me 76th Avenue building contains She added that it falls in line with the owners will occupy offices in the new-- 48,330 square feet of office space, of city's goals for the Medical/Highway 99 space. which about 80 percent has been ]eased, Activity Center, in its Con P -ehensive Gregory said., Plan. Arts cen er cont- t rartapp -8, M071'10on roved' r $9, Enterprise staff for 4 - 6 p. m. Wediiesday. homish County Coullci* -are co-chairs of the general -Sept. 28 in front of the com"' - "We�believe the renova- capital campaign. The Edmonds Public plex. Rick Steves owner of tion . of the arts center is Other campaign chairs Facility District Board offi- "Europe - through'the Back important for so many rea- include Edwina and Richard Lu cially approved on Tuesday, Door" travel company, will Soils -, culture, community, Baxter, Lindsey and Car- Z Sept. 13 a $9.8 million con- speak at the Post -ground- historic - tpreservation and olyn Echelbarger, Gary and Lu tract with Sellen Construc- breaking gathering. economic development," Dolly Haakenson, Gary and u) tion Company for remodel- There will be refresh- said Terry Vehrs, president JoAnne Nelson, Mike and 0 ing a former high-school ments and from 4:30.- 6 p.m. of the public facilities dis- and college campus into the Pearl I Wendy Popke, Judi Schmitt )jango, a gYPsy jazz trict. "The new center will Anne and Rick Steves, Bo� new Edmonds Center for band, will entertain the 4b the Arts., serve the Edmonds commu- Stevenson, Phil Smart Jr. -0 crowd. nity and take E- Sellen lost no time fenc- oil greater and Terry and Lara Vehrs' "This is a historic event regional significance, too.,, More than 20 other comillu-' 2 ing the site located at 410 in our - community. After Tile capital campaign for nity leaders are active with Q& Fourth Ave. N. to begin ren- decades of hard work' and the arts center will be active the capital campaign. V) ovation of the historic audi- with a passionate vision by during tile year ahead pro- Volunteers are - welcome torium that will be the heart so many citizens, we are viding construction tours to help with of the regional arts com- about to. see the historic fo fund-raising Rlex., r donors and planning for and public awareness. Call t Edmonds High School audi- the- opening season. Dave 425-775-7724 for more infor- I A public celebration of torium transformed into a -long first-class a*rts center," said Phase of the capital ca mation or visit s 2: the start of the year Earling is leading the public constructio * 11 PI-Oiect...is set Gary Nelson, chairman Sno- m- www.edi-nondscenterfort- 4AI4 4; 1� -p r,�' paign. Barb and Pat Fahey, hearts.org. J ? auut UI Ln school year. Last Spring, district sta Projected a districtwide enrol ment of 20,127 students, an, 0 the official figure as of th. fourth day of school, an impoi tant date for districts, wa: 20,281. In raw figures, this is 15, -more bodies than what wa., Projected, and 96 full-timE equivalent (FTE) studentr more than expected. The FTE number takes into account students who attend only Partial days, 'including kindergartners and Running Start students and mathematically coWbines these Part-time students into full-time, giving the district the number of full-time equivalent students. 'We came really close to what our projected (number) was," said Doug Pierce, the district's human resources director. 'Mis fourth -day count is important because the num- ber of FFE is what the district uses to calculate the budget. Any large differences between projected and actual FTE can negatively affect school districts if they predict more students than actually enrol]. But this was not the case�in' Edmonds, and it now should receive more state funding with the increase in enroll- ment. Now, staff will focus on the individual schools, and minor shifts in staffing and class- rooms may be necessary to even teacher -student ratios. Me goal, Pierce said, is to ,try 0 come up with a plan that is east disruptive to the fewest tudents and staff." Pierce said enrollment in K-1 See COURT, Pag­--� HeraldNet Page I of I IfenddOY— The Herald - Everett, Wash. - www.HeraldNetcom Published: Friday, August 5, 2005 Date set to begin work on Edmonds arts center By BX Sheets Herald Wiiter EDMONDS - The Edmonds Center for the Arts appears ready to move from concept to concert hall. After three years of preparatory work and fundraising, a date to begin building is set: Sept. 16. "We're excited to finally get going. It's been a long time and a lot of work and it's fun to finally see it here," said Terry Vehrs, president of the board of the Edmonds Public Facilities District, which is managing the project. The $18.5 million plan involves tearing out and rebuilding much of the interior of the former Puget Sound Christian College building at 401 Fourth Ave. N. The result will be a 700-seat, state-of-the-art performance hall. Work is expected to be done by October 2006. The PFD bought the college building, part of which was built in 1909 as the original Edmonds High School, in 2002 for $4 million. The original plan was to start construction in mid-2003 and finish this year. Although the PFD received money for the project from a variety of public and private sources, it remains $4 million short of the total needed. In June, the city agreed to back a loan of up to $7 million in case the PFD needs it. "We can borrow against it for what we need to get started," Vehrs said. "We wanted to get as much of the money in as possible" before beginning construction, he said. The PFD will keep trying to raise the remaining $4 million through private contributions, Vehrs said. "The $64,000 question is when the fundraising will be completed," said Dan Clements, Edmonds finance director. The city and the PFD agree the loan was a way to get the project started before inflation continued to run the costs up. The original estimate was $16 million. "We were fighting the escalating cost battle," Vehrs said. The work will be done by Sellen Construction of Seattle. In addition to refurbishing the auditorium, which was added to the building in 1939, work will involve creating a new entryway and lobby, rebuilding the interior to create support facilities and tearing down other buildings to make room for parking and a meeting room - banquet hall. Meeting rooms upstairs will be available for community use. A building at the north end will be replaced with a parking structure and meeting room. Reporter Bill Sheets: 425-339-3439 or sheets@heraldnet.com. Copyright @1996-2005. The Daily Herald Co. ALL RIGHTS RESERVED. http://www.heraldnet.comlstoriesISVvTrintlt.cfm?page=http%3A%2F%2FwwwOlo2Eheratdnet%2Ec... 8/5/2005 Page I of 1 Wesffall, John From: Sherrill Myers [smyers@LMNArchitects.com] Sent: Wednesday, June 29, 2005 4:04 PM To: Kjristine Lund Cc: Clifton, Stephen; wesffall@ci.edmonds.wa.us; Norm Brown; Brent Cummings; Byron Rice; Julie Adams Subject: Music Building Kjris, As you are aware there will be no heat, electricity, water or fire protection sprinkler service to the Music Building in the first phase of this project. While we believe everyone has signed off on this, we have never discussed any insurance requirements, so please confirm that there are no insurance requirements or other City requirements in this respect. Thanks, Sherrill Myers, RIBA Principal Lmiers@lmnarchitects.com ILMN ARCHITECTS 801 SECOND AVENUE SEATTLE WA 98104 206-682-3460 6/29/2005 Edmonds Center for the Arts 18 August 2003 PROGRESS REPORT IBC 2003 Analysis for the Edmonds Center for the Arts Project �' I I T, T, I F, "MIN f n The Edmonds Center for the Arts project includes alteration, renovation, and addition to the existing 1909/1939 Edmonds High School, most recently owned and operated by the Puget Sound Christian College as their campus. The intention of the project is to provide compliance to the 2003 IBC, adopted by the State of Washington in April 2003, effective July 2004. Construction is anticipated to begin in 2005. The existing building appears to be most similar to Type III A construction as defined by the 2003 International Building Code (concrete and steel frame construction with wood joist floor and roof assemblies). The two main spaces (theater and gymnasium) use Type IV (HT) wood decking and steel trusses with steel and wood purlins in their roof structure assembly. The stage roof is HT construction. RegulatoU Codes And Authorities International Building Code (IBC), 2003 edition. The State of Washington is scheduled to require compliance with this Code, with amendments yet to be determined, beginning July, 2004. Washington Administrative Code, WAC 51-40, Washington State Accessibility Regulations. July, 2001. Washington State Amendments to the 1997 UBC, Table 29-A, Minimum Plumbing Fixtures. REVIEW ITEMS 1. EXISTING STRUCTURES (Chapter 34) Definitions (from the IBC 2000): Alteration: any construction or renovation to an existing structure other than repair or addition. Addition: an extension or increase in floor area or height of a building or structure. Repair: the reconstruction or renewal of any part of an existing building for the purpose of its maintenance. Additions, alterations, and repairs shall conform to requirements of the IBC and not cause the existing building to be in violation of this code. The existing building plus additions shall comply with the height/area limitations of this code. 5ee "Allowable FloorArea andHeight"section thatfollow5.) Portions of the structure not altered/affected by alterations are not required to comply with.code requ irements (3403. 1 ). The ",63ck of House " (90H) portion of the project (east of fire wall) contains minor alteration5and repairs. While those alterations will meet the 18C 2003 pro visions, the intent is to limit new woTh- in the ROH andnot bring the entire BOH up to current code. LMNArchitects L-AP,.jcctskcca\other\4. AGENCY\CDCodcRcvi�.doc t i EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 Additions/alterations shall not increase force on any structural element by 5%. Uncovered structural elements found to be unsound/deficient shall be made to conform to requirements for new structures (3403.2). The addition andalterations do not lessen the structural cap3bilides of the existingstructure. A synopsis of the structural design approach isattached Change of existing occupancy requires conformance to the code requirements for the new occupancy. Subject to approval by the Building Official, not all requirements of the code need to be met if the Ejsj������rdous, ased on i e an re risk". than the existing use (3406.1). PROJECT CHA NGE OF OCCUPA 1VCY SUMA4A R Y ARE41ROOM EXIS77NG USE10CCURANCY CROUP PROPOSED USE10CCURANCY GROUP R.O.H. First Floor North Room Core fast Classroom5 Daycare uselmeeting EIA-3 Toilet ROOM5 Dayrare use, E Green Room/Dressing Room, A -3 No Change (5hower, washerldryer room, toilet, Janitor:� closet added) Dayrare U5e/Dre55inff Rooms, EIR 8. 0. H. Second Floor North Room Meeting Room, A-3 ReheatsalSv3ce, A-3 Center Room Meeting Room, A-3 Unchanged South Room Meeting Room, A-3 Rehears,715pace, A -3 Gymnasium Spaces Assemb�v uses, A-4 Unchanged Occupancy of the project does not differ from the existing occupancy in terms of 18C c)assifications, T' " b6 In 0 cia LMNArchitects 2 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 2. BUILDING CLASSIFICATIONS (Chapters 3, 5, and 6) Use and Occupancy Classification (Chapter 3) The Edmonds Center for the Arts (ECA) will include Assemb�lGroupk A-1 ±750 seat theater (Orchestra 110, Balcony 20C) A-3 ' Theaterlobbie5 (Lobby 101, UpperLobby212, Ve5dbule200, meeting room (Meeting Room 223), Green Room (Green RrqlWardrobe 13 1), rehearsal space (Rehe3tsal 22C) A-4 Gymnasium (Gymnasium 145) Business Group R.- A ncillaT back of house areas.- administrative offices, dres5ing rooms MIXED OCCUPANCY: (302.3) Nonseparated uses (302.3.1): each portion of the building shall be individually classified as to use. See above occupancy fistings. The required Type of Construction shall be determined by the occupancy classification with the most restrictive height/area limitations. OccupancyA- 1 has the most restrictive heiqhtlare3 limitations. See Type of construction 5eclion that follows. All other code requirements shall be based on the use of that space, except that the most restrictive applicable requirements of Chapier 9 will apply to non -separated uses. Project& tul�vsprinklered Fire separations are not required between uses, except as required by other provisions. Incidental storage in Group B occupancies need not be separated is storage area is less than 10% of the floor area, or if area is sprinklered and is less than 3,000 S.F., or if area is less than 1,000 S.F. (Table 302.1.1 footnote, 2002 Supplemental). Storaffe room 134 off the Green RmlWardrobe isin thiscateffory. Accessory Use Areas: fire barrier not required if not more than 10% of floor or more than tabulated value of height/area for such use (302.2). ZobhyStordge (478 S.F) and Gymnasium Storage (434 S.F) are in this cateffoty. Type of Construction (Chapter 6) TypellIB: Exterior walls of non-combustible material (fire retardant treated wood framing permitted in walls of 2-hour or less rating). Interior building elements of any material are permitted by the code. Rating Requirements for Building Elements (from Table 601) Building Element Hour Rating (Type III B) Structural Frame 0 Exterior Bearing Walls 2 Interior Bearing Walls 0 Exterior Non -Bearing Walls per Table 602 LMNArchitects 3 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 Interior Non -Bearing Partitions 0 * Floors Construction 0 Roof Construction 0 * But not less than requirements of other parts of the code (footnote e). Note: Exterior bearing walls: not less than Table 602. Fire Resistance Requirements for Exterior Walls per Separation Distance (from Table 602) for Construction Group III-B. Distance (ft) Groups A, B more than 5 1 more than 10 1 more than 30 1 30 or more 0 Allowable Floor Area And Heigh (Chapter 5) Allowable height and building areas (from Table 503) Occupancy Group e 111111 B Max. height: 55 feet_ A-1 S (stories) 2 A (area) 8,500 S.F. A-3 and A-4 S (stories) 3 A (area) 9,500 S.F. B S (stories) 4 A (area) 19,000 S.F. Height Modifications (504): with automatic sprinkler system, increase height by 20 feet and number of stories by 1. These increases allowed in addition with increases from 506.2 and 506.3. Area Modifications (506) with Group A-1 Occupancy controlling maximum allowable area: Equation 5-1: Aa = At + (At If /100) + (At 1, /100) At = 8,500 S.F. (per Table 503) If = 100 (F/P - 0.25) W/30 (Equation 5-2) LMNArchitects 4 I EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 F = 825 feet P = 1075 feet W = 30 feet (maximum allowed with W/30 < 1.0) If = 51.7% Is = 200% for multistory building (506.3) Aa = 29,895 S.F. (Maximum allowable Group A area per floor for Type III B construction) A CtUdl A Teas in PTOPOSed FrOjeCt Levell: A red of building within surrounding walls: 2-9,743 5 F Coveredporch 7-91 SIF 30,53451F tevel2: Area of building within surrounding w3lls: 17, �963 S. F ,Waxim um allo wable area for Dipe N LY exceeded by 673-9 5 F Project is fid�v sprinklered in accordance with Chapter 9. HeiqhtandArea Increase allowance for automatic sprinkler sy5tem will be selected A ddidonal�v, a fire wall will be employed to reduce the project 17oor area to meet theabo ve limit5. The fire wall divides the project building into two areas., Front -of -House (FOH) and 834-of-House (80H). AREA FOH BOH Total First Floor 13,54-5 16,989 30,534- Second Floor 7,587 10,376 17,963 Total 21,132 S.F. 27,365 S.F. 48,4-97 S.F. LMNArchitects EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 3. SPECIAL DETAILED OCCUPANCY REQUIREMENTS (Chapter 4) Stages and Platforms (410) Auditorium stage constructed on -grade. Galleries, gridirons, catwalks, pinrails (410.3.2): fire protection not required. Construct with materials consistent with construction type, except floors of galleries and catwalks (any approved material). If Stage height less than 50'-0": 2-hour proscenium not required (410.3.4) Proscenium curtain not required (410.3.5) Project Staffe Heiffh t, per 193-9 dra wlnffs ProjectSt3ge Area: 1,��75F 46'-4" hiffh point top of roof deckinff - 3-2 -�4' " heiffht of staffe 4_9' 6 �0 - Existinff Staffe Heiffht .Y4 "plywoodaddedper this project 4.9 �-7 02 - Stage Height Stage Ventilation (410.3.7.1): 2 or more auto -opening roof vents required equal to at least 5% of stage area. Supplemental manual operation, curb, and label required. -985F of ventrequired. Three C'-O"x -O'vents in project ToW area is 108 5. F PlJtform in Meednff Room: 13'hiffh, 272 5. F of 1800 S. F room, wood construction, no stior3ffe space below (see 4 10.4). Dressing and Appurtenant Rooms (410.5): For stage height 50'-0" high or less, 1 hour separation form stage, with approved opening protectives (410.5. 1). Back w3fl ofst3ge in project is fire wafl rated at 3 hours with 3 hour openinff5. Dressing and appurtenant rooms shall be separated from each other by 1 hour rated assemblies (4 10. 5.2). Seodr3tedpartitions are existinff. Stage exits (4-10.5.4): at least one exit for each side of stage. /Automatic sprinkler system required for stage and accessory rooms (410.6). iStandpipes per 905. LMNArchitects 6 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August2003 4. MEANS OF EGRESS (Chapter 10) OCCUPANT LOAD: (from Table 1004.1.2) IAREA/ LO CATION/ NAME I AAAX. ALLOWANCE/OCCUP. PROJECT FLOOR AREA TOTAL OCCUPANTS FIRST FLOOR: ORCHESTRA LEVEL Lobby Non -simultaneous use with Auditorium 2,535 Box Office 100 gross 52 1 Concessions 100 gross 54 1 Lobby Storage 300 gross 4-78 2 Au itorium fixed seats n/a 404 Stage 15 net 1,957 130 Orchestra Pit 7 net 310 44 * Dressing Rooms (2) Small 50 net 130+131 (2)3 Dressing Rooms (2) Large 50 net 894+873 (2)18 Green Room 7 net 1,058 151 Women's Lockers 50 gross 1.017 21 Gymnasium 50 gross 6,175 124 Gymnasium Storage 300 gross 434 2 Men's Lockers 50 gross 1,332 27 Total First Floor Occupancy Load 949 SECOND FLOOR: BALCONY LEVEL UpperLobby Non -simultaneous use with Balcony 628 - Stair 2 Vestibule Non -simultaneous use with Balcony 197 - Balcony (includes Side Boxes) fixed seats. n/a 319 Lighting Room 100 gross 138 2 Administration/Offices 100 gross 1,465 15 Meeting Room 7 net 1,526 218 Platform 15 net 272 18 Meeting Room Ancillary Spaces 100 gross 861 9 Rehearsal 15 net 884 59 North Gymnasium Bleachers 1.5 lineal foot 306.5 L.F. 205 South Gymnasium Bleachers 1.5 lineal foot 466.5 L.F. 311 Total Second Floor Occupancy Load 1,156 Total Building Occupancy Load �2,1 0=5 *44 in pit, when open, or 20 fixed seats, when pit is covered LMNArchitects 7 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 Egress Width, with sprinkler system (Table 1003.2.3): Stairways: 0.2"/Occupant Other Egress Components: 0.1 5"/Occupant Component Capacity Building Component Width Occupant Capacity Stair 1 4'-8" 280 Stair 2 4'-6" 270 Stair 3 T-1 1" 235 Stair 4 5'-2 1/2- 312 3'-0" Door 34" clear 226 3'-4" Door 38" clear 253 4'-0" Door 46" clear 306 Refer to 5heetA004, ExitinglZife Safety Diaffr3m5, for calculated occupantexitinff loads throuffhout building. LMNArchitects 8 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 5. IFIRE-RESISTANCE-RATED CONSTRUCTION (Chapter 7) Fire walls: Fire walls create separate buildings. Fire walls shall have sufficient structural stability to allow collapse of construction on either side without collapse for required time (705.2). Fire walls shall be constructed of non-combustible material. Rating required: 3 Hour (Table 705.4, Occupancy Group A and B). Fire wall shall be continuous from exterior wall to exterior wall (termination at interior surface of non- combustible exterior sheathing if both sides sprinklered per 705.5, exception 5). At intersection of exterior walls, exterior wall shall be 1 -hour with Yt hour opening protection (where required) extending a minimum 4 feet on each side of the intersection (705.5.2). Fire walls shall extend to outer edge of projecting elements that are within 4 feet of firewall (705.5.2). Fire walls shall extend from the foundation to 30" above both adjacent roofs (705.6). For Type III construction, termination at underside of combustible roof sheathing is allowed if minimum Class B roof covering, no roof openings within 4 feet, and fire retardant treated wood roof sheathing for 4 feet on both sides of the fire wall. In lieu of fire retardant.treated sheathing, the roof can be protected with 5/8- inch Type X gypsum board directly beneath the underside of the roof sheathing supported by ledgers and extending 4 feet on each side of the fire wall. LMNArchitects 9 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 6. PLUMBING FIXTURE REQUIREMENTS PLUMBING FIXTURE REQUIREMENTS: Washington State Amendments to the 1997 UBC, Table 29A Floor Area s.f Factor Table 29-A I Occupants I Notes FIRST FLOOR 700 excl. accessory use area occupants A-1 Assembly (Theater Auditorium — 392 fixed seats) Par Terre with 12 loose chairs 392 +12=404 A-3 Assembly (Green Room) 1,058 30 0 Simultaneous use with Auditorium/Stage Stage 1,957 30 65 Orchestra Pit 310 30 21 Lobby 2638 0 Simultaneous use with Auditorium Box Office 52 200 1 Dressing rooms 1,767 30 0 Simultaneous use with Stage Lo Stora e 478 200 3 Gymnasium 6,175 30 206 SECOND FLOOR 523 excl. accessory use area occupants A-1 Theater Balcony (289 fixed seats) Boxes with 30 loose chairs 289 + 30 319 A-3 Lobby 825 0 Simultaneous use with Auditorium Lighting Room 138 200 1 Administration/Offices 1,465 200 8 Meeting Room 1,798 30 60 Rehearsal 884 30 29 Gymnasium Bleachers 3,182 30 106 Total Plumbing Occupants I 1 1 1,223 LMNArchitects 10 EDMONDS CENTER FOR THE ARTS Project No. 02090 18 August 2003 Table 29-A (Washington State Amendments to the UPC) REQUIRED & PROPOSED NUMBER OF TOILET FIXTURES FOR MEN: Men WC REQ PRO URINAL REQ PRO LAV REQ PRO Group A Assembly: Green Room, Gymnasium,Stage (487 total, 50% male) 244 5 0 3 Group A Assembly, Theater 723 total, 50% male) 362 5 0 3 Group B (13, 50% male) 7 1 0 1 TOTAL REQUIRED 11 0 7 Urinal Substitution - Reduce WC 7 4 Total Proposed 8 10 7 Note: 4 existing wc's, 6 existing urinals, 3 existing lavatories. REQUIRED & PROPOSED NUMBER OF TOILET FIXTURES FOR WOMEN: Women WC LAV REQ PRO REQ PRO Group A Assembly: Green Room, 244 5 3 Gymnasium,Stage (487total,50% female) Group A Assembly, Theater (723 total, 362 15 3 50% female) Group B (13, 50% female) 7 1 TOTAL REQUIRED 21 7 Total Proposed 22 -9 Note: 5 existing wc's, 2 existing lavatories. Note: Two additional wc's and two additional lavatories are provided in "Principal" Dressing rooms (unisex). Number of Drinking Fountains required for total building occupancy: 4-. Provided- 4. END OF CODE ANALYSIS LMNArchitects I I Wesffall, John From: Westfall, John Sent: Thursday, June 09, 2005 11:22 AM To: Jeff LaFlam Subject: Stage Roof Vent Activation vs. Suppression Jeff: Your information prompted a look at 13... D-8 exception 1 (d) says that the activation of the stage sprinklers activates the auto closer for the proscenium curtain AND opens the roof vents. Now perhaps a flow switch along that branch should activate. The architect's specification for roof vents calls to allow sprinkler activation FIRST then the vents at a higher temp. I don't think either action should be activated at a different temp so that either protection activity may be foregone by the efforts of the other. I think I have a direction. Thanks! John APPENDIX E 13-271 and to prevent flame from a fire on the stage from becoming visible from the auditorium side for a 5-min period where the curtain is of asbestos. Other materials shall be permitted if they have passed a 30-min fire test in a small scale 3 ft X 3 ft (0.9 m x 0.9 in) furnace with the sample mounted in the horizontal plane at the top of the furnace and subjected to the standard time -temperature curve. The curtain shall be automatic -dosing without the use of applied power. All proscenium curtains shall be in the closed position except during performances, rehearsals, or similar activities. Exception No. 1: In lieu of the protection required herein, all thefol- lowing shall be provided: (a) A noncombustible opaquejabric curtain shall be arranged so that it will close automatically; and (b) An automatic, fixed waterspray deluge system shall be located on the auditorium side of the proscenium opening and shall be arranged so that the.entireface of the curtain will be wetted. The sys- tem shall be activated by combination of rate -of -rise and fixed -temper- ature detectors located on the ceiling of the stage. Detectors shall be spaced in accordan . ce with their listing. The water supply shall be con- trolled by a deluge valve and shall be sufficient to keep the.curtain completely wet far 30 min or until the valve is closed by fire depart- ment personnel; and (c) The curtain . shall be automatically operated in case offire by a combination of rate -of -rise and fixed -temperature detectors that also activates the deluge. spray system. Stage sprinklers and vents shall be automatically operated by fusible elements in case offire; and (d) Operation of.the stage sprinkler system. or spray deluge valve shall atitornatically 'activate the emergency ventilating system and close the curtain; and (e) The curtain; vents, and spray deluge system valve shall also be capable of manu . at operation. Exception No. 2: Proscenium fire curtains or water curtains comply- ing with 8-4.5. 7 of NFPA 10 1. (101: 94.5.7) D-9 Listed quick response or listed residential sp . rinklers shall be used throughout smoke compartments containing patient sleeping rooms. (101: 12-3.5.2) The requirements for use of quick response sprinklers intends that quick response sprinklers be the predominant type of sprinkler installed in the smoke compartment. It is rec- ognized, however, that quick response sprinklers may not be approved for installation in all areas such as those where NFPA 13, Standard for the Installation of Sprinkler Systems, requires sprinklers of the intermediate- or high -temperature classifica- tion. It is not the intent of the 12-3.5.2 of NFPA 101 require- ments to prohibit the use of standard sprinklers in limited areas of a smoke compartment where intermediate- or high - temperature sprinklers are required. Where the installation of quick response sprinklers is impracticable in patient sleeping room areas, appropriate equivalent protection features acceptable to the authority hav- ingjuriscliction should be provided. It is recognized that the use of quick response sprinklers may be limited in facilities housing certain types of patients, or due to the installation lim- itations of quick response sprinklers. (101: A-12-3.5.2) D-10 Where an automatic sprinkler system is installed, either for total or partial building coverage, the system shall be in- stalled in accordance with Section 7-7 of NFPA 101. In build- ings up to and including four stories in height, systems installed in accordance with NFPA 13R, Standardfor the Instal- lation of Sprinkler Systems in Residential Occupancies up to and In- cluding Four Stories in Height, shall be permitted. Exception No. 1: In individual dwelling units, sprinkler installation shall not be required in closets not over 12 sqft (1. 1 sq m). Closets that contain equipment such as washers, dryers, furnaces, or water heaters shall be sprinklered regardless of size. Exception No. 2: The draft stop and closely spaced sprinkler require- ments of ATPA 13, Standardfor the Installation of Sprinkler Systems, shall not be requiredfor convenience openings complying with 6-2.4.8 of ATPA 101 where the convenience opening is within the dwelling unit. (101: 18-3.5.1) Appendix E Referenced Publications E-1 The following documents or portions thereof are refer- enced within this standard for informational purposes only and are thus not considered part of the requirements of this standard unless also listed in Chapter 13. The edition indicat- ed here for each reference is the current edition as of the date of the NFPA issuance of this standard. E-1.1 NFPA Publications. National Fire Protection Association, I Batterymarch Park, P.O. Box 9101, Quincy, MA 02269-9101. NFPA 13E, Guide for Fire Department Operations in Properties Protected by Sprinkler and Standpipe Systems, 1995 edition. NFPA 13R, Standardfor the Installation of Sprinkler Systems in Residential Occupancies up to and Including Four Stories in Height, 1996 edition. NFPA 14, Standardfor the Installation of Standpipe and Hose Systems, 1996 edition. NFPA 20, Standard for the installation of Centrifugal Fire Pumps, 1999 edition. NFPA 22, Standard jbr Water Tanks for Private Fire Protection, 1998 edition. NFPA 25, Standardfor the Inspection, Testing, and Maintenance of Water -Based Fire Protection Systems, 1998 edition. NFPA 33, Standard far Spray Application Using Flammable or Combustible Materials, 1995 edition. NFPA 36, Standardfor Solvent Extraction Plants, 1997 edition. NFPA 72, National Fire Alarm Codem, 1996 edition. NFPA 80A, Recommended Practice for Protection of Buildings from Exterior Fire Exposures, 1996 edition. NFPA 99, Standardfor Health Care Facilities, 1999 edition. NFPA 10111, Life Safety Cod -A, 1997 edition. NFPA 214, Standard on Water -Cooling Towers, 1996 edition. NFPA 220, Standard on Types of Building Construction, 1999 edition. NFPA 29 1, Recommended Practice for Fire Flow Testing and Marking of Hydrants, 1995 edition. NFPA 307, Standard for the Construction and Fire Protection Of Marine Terminals, Piers, and Marves, 1995 edition. NFPA 318, Standardfor thePmtection of Cleanrooms, 1998 edition. NFPA 409, Standard on Aircroift Hangars, 1995 edition. NFPA 415, Standard on Airport Terminal Buildings, Fueling Ramp Drainage, and Loading Walkways, 1997 edition. NFPA 423, Standardfor Construction and Protection of Aircraft Engine Test Facilities, 1999 edition. NFPA 430, Code for the Storage of Liquid and Solid Oxidizers, 1995 edition. NFPA 703, Standard for Fire Retardant Impregnated Wood and Fire Retardant Coatingsfor Building Materials, 1995 edition. 1999 Edition 13-270 INSTALLATION OF SPRINKLER SYSTEMS C-7-5.2.3 No tests were conducted with idle pallets in racks using standard spray sprinklers. However, tests were con- ducted using ESFR and large drop sprinklers. Such storage conceivably would introduce fire severity in excess of that con- templated by protection criteria for an individual commodity classification. C-7-9.8.1 Temperatures in the test column were maintained below 1000'F (538'C) with densities, of roof ceiling sprinklers only, of 0.375 gpM/ft2 (15.3 mm/min) with 8-ft (2.4-m) aisles and 0.45 gpM/ft2 (18.3 mm/min) with 4-ft (1.2-m) aisles using the standard commodity. Appendix D Sprinkler System Information from the 1997 Edition of the Life Safety Code This appendix is not a part of the requirements of this ATPA doc- ument but is includedfor informational purposes only. D-I Introduction. This appendix is provided as an aid to the user of NFPA 13 by iclentif�ing those portions of the 1997 edi- tion of NFPA 101, Life Safe� Code, that pertain to sprinkler sys- tem design and installation. It is not intended that this appendix provide complete information regarding all aspects of fire protection addressed by NFPA 101. It is important to note that this information was not copied from NFPA 101 using NFPA's extract policy and is not intended to be a part of the requirements of NFPA 13. While the 1997 edition of the Life Safety Code was the most current at the time of the publica- tion of the 1999 edition of NFPA 13, a 2000 edition of the Life Safety Code is in preparation. D-2 Dermitions. See NFPA 101, L�fe Safety Code, for terms not defined in Chapter 1. D-3 Atriums. Glass walls and inoperable windows shall be per- mitted in lieu of the fire barriers where automatic sprinklers are spaced 6 ft (1.8 m) apart or less along both sides of the glass wall and inoperable windows, not more than I ft (0.3 m) from the glass, and with the automatic sprinklers located so that the entire surface of the glass is wet upon operation of the sprin- klers. The glass shall be tempered, wired, or laminated glass held in place by a gasket system that permits the glass framing system to deflect without breaking (loading) the glass before the sprinklers operate. Automatic sprinklers shall not be required on the atrium side of the glass wall and inoperable win- dows where there is no walkway or other floor area on the atrium side above the main floor level. Doors in such walls shall be glass or other material that will resist the passage of smoke. Doors shall be self -closing or automatic -closing upon detection of smoke. [ 10 1: 6-2.4.6, Exception No. 2 to (a)] D-4 Connection to Domestic Water Supply. Sprinkler piping serving not more than six sprinklers for any isolated hazardous area shall be permitted to be connected directly to a domestic water supply system having a capacity sufficient to provide 0.15 gpm/sq ft (6.1 L/min/sq m) of floor area throughout the entire enclosed area. An indicating shut-off valve shall be installed in an accessible location between the sprinklers and the connection to the domestic water supply. (101: 7-7.1.2) D-5 Supervision. (101: 7-7.2) D-5.1 Supervisory Signals. Where supervised, automatic sprinkler systems are required by another section of NFPA 101, supervisory attachments shall be installed and monitored for integrity in accordance with NFPA 72, National Fire Alarm Code, and a distinctive supervisory signal shall be provided to indicate a condition that would impair the satisfactory opera- tion of the sprinkler system. This shall include, but not be lim- ited to, monitoring of control valves, fire pump power supplies and running conditions, water tank levels and temperatures, pressure of tanks, and air pressure on dry -pipe valves. Supervi- sory signals shall sound and shall be displayed either at a loca- tion within the protected building that is constantly attended by qualified personnel or at an approved, remotely located receiving facility. (101: 7-7.2.1) D-5.2 Alarm Signal Transmission. Where supenision of auto- matic sprinkler systems is provided in accordance with another provision of NFPA 101, waterflow alarms shall be transmitted to an approved, proprietary alarm receiving facil- ity, a remote station, a central station, or the fire department. Such connection shall be installed in accordance with 7-6.1.4 of NFPA 101. (101: 7-7.2.2) D-6 Stages. D-6.1 Sprinklers shall not be required for stages 1000 sq ft (93 sq m) or less in area and 50 ft (15 m) or less in height where curtains, scenery, or other combustible hangings are not retractable vertically. Combustible hangings shall be limited to a single main curtain, borders, legs, and a single backdrop. (101: 8-4.5.10, Exception No. 1) D-6.2 Sprinklers shall not be required under stage areas less than 4 ft (1.2 m) in clear height used exclusively for chair or table storage and lined on the inside with 5/g-in. (1.6-cm) Type X gypsum wallboard or the approved equivalent. (101: 8-4.5.10, Exception No. 2) D-7 Exhibition Booths. The following shall be protected by automatic extinguishing systems: (a) Single -level exhibit booths greater than 300 sq ft (27.9 sq m) and covered with a ceiling. (b) Throughout each level of multilevel exhibit booths, including the uppermost level if the uppermost level is cov- ered with a ceiling. (c) Asingle exhibitor group of exhibits %ith ceilings that do not require sprinklers shall be separated by a minimum of 10 ft (3 m) where the aggregate ceiling exceeds 300 sq ft (27.9 sq m). The water supply and piping for the sprinkler system shall be permitted'to be of approved temporary means taken from an existing domestic water supply, an existing standpipe sys- tem, or an existing sprinkler system. Exception No. 1: Ceilings that are constructed of open grate design or listed dropout ceilings in accordance with NFPA 13, Standardfor the Installation of Sprinkler Systems, shall not be considered ceilings with- in the context of this section. Exception No. 2.- Vehicles, boats, and similar exhibited products hav- ing over 100 sq ft (9.3 sq m) of roofed area shall be provided with smoke detectors acceptable to the authority havingjurisdiction. Exception No. 3: Merefire protection of multilevel exhibit booths is consistent with the criteria developed through a lfe safety evaluation of the exhibition hall in accordance with 8-4:1 of NfiPA 101, subject to approval of the authority having jurisdiction. (See A-8-2.3.2 of MPA 101.) (101: 8-7.5.3.7) D-8 Proscenium Curtain. The proscenium opening of every legitimate stage shall be provided with a curtain constructed and mounted so as to intercept hot gases, flames, and smoke 1999 Edition 13-56 INSTALLATION OF SPRINKLER SYSTEMS 1 5-13.12* Industrial Ovens and Furnaces. 5-13.13* Open -Grid Ceilings. Open -grid ceilings shall not be installed beneath sprinklers. Exception No. 1: Open -grid ceilings in which the openings are 114 in. (6.4 mm) or larger in the least dimension, where the thickness or depth of the material does not exceed the least dimension of the opening, and where such openings constitute 70percent of the area of the ceiling ma- terial. The spacing of the sprinklers over the open -grid ceiling shall then comply with thefollowing: (a) In light hazard occupancies where sprinkler spacing (either spray or old-style sprinklers) is less than 10ft X ]Oft (3 m X 3 m), a minimum clearance of at least 18 in. (457 mm) shall be pro- vided between the sprinkler deflectors and the upper surface of the open -rid ceiling. Mere spacing is greater than 10ft x ]Oft (3 m X 3 m) but less than 10ft x 12ft (3 m x 3.7 m), a clearance of at least 24 in. (610 mm) shall be providedfrom spray sprinklers and at least 36 in. (914 mm) from old-style sprinklers. Mere spacing is greater than 10ft X 12ft (3 m x 3.7 m), a clearance of at least 48 in. (1219 mm) shall be provided. (b) In ordinary hazard occupancies, open -grid ceilings shall be permitted to be installed beneath spray sprinklers only. Mere sprin- kler spacing is less than 1 Oft X 10ft (3 m X 3 m), a minimum clear- ance of at least 24 in. (610 mm) shall be provided between the sprinkler diflectors and the upper surface of the open -rid ceiling. Mere spacing is greater than 10ft x 10ft (3 m x 3 m), a clearance of at least 36 in. (914 mm) shall be provided. Exception No. 2: Other types of open -grid ceilings shall not be in- stalled beneath sprinklers unless they are listedfor such service and are installed in accordance with instructions contained in each package of ceiling material. 5-13.14 Drop -Out Ceilings. 5-13.14.1 Drop -out ceilings shall be permitted to be installed beneath sprinklers where ceilings are listed for that service and are install ' ed in accordance with their listings. Exception: Special sprinklers shall not be installed above drop -out ceil- ings unless spec�flcally listedfor this purpose. 5-13.14.2 Drop -out ceilings shall not be considered ceilings within the context of this standard. 5-13.14.3* Piping installed above drop -out ceilings shall not be considered concealed piping. (See 3-6.4, Exception No. 2.) 5-13.14.4* Sprinklers shall not be installed beneath drop -out ceilings. 5-13.15 Old -Style Sprinklers��.Qld-.style sprinklers shall not be used'i-ii 5--newihifflldtion. Exception No. P* Old-style sprinklers shall be installed infur storage vaults. (See A-5-13.15, Exception No. 1.) Exception No. 2: Use of old-style sprinklers shall be permitted where construction features or other special situations require unique water distribution. 5nI&I6 , ,Stages. 5-13.16.1 Sgrinklers� shall be installed under the roof at the cei fng_,"nj�-,spaces under the stage either containing combus- tible matiiials or constructed of combustible materials, and in all -adjacent- spaces and dressing rooms, storerooms, and workshops. 5-13.16.2 Where proscenium opening protection is required, a deluge system shall be provided with open sprinklers located 1999 Edilion not more than 3 ft (0.9 m) away from the stage side of the pr&e� arch and spaced up to a maximum of 6 ft (1.8 in) on center. (See Chapter 7for design criteria.) 5-13.17 Provision for Flushing Systems. All sprinkler systems shall be arranged for flushing. Readily removable fittings shall be provided at the end of all cross mains. All cross mains shall terminate in 11/4 in. (33 m!"110 or larger pipe. All branch lines on gridded systems shall.be arranged to facilitate flushing. 5-13.18 Stair Towers. Stairs, towers, or other construction with incomplete floors, if piped on independent risers, shall be treated as one area with reference to pipe sizes. 5-13.19 Return Bends. Return bends shall be used where pendent spfinklers are supplied from a raw water source, a mill pond, or open -top reservoirs. Return bends shall be con- nected to the top of branch lines in order to avoid accumula- tion of sediment in the drop nipples. (See Figure 5-13.19.) Exception No. 1: Return bends shall not be requiredfor deluge systems. Exception No. 2: Return bends shall not be required where d"en- dent sprinklers are used. Figure 5-13.19 Return bend arrangement. Ceiling / 5-13.20 Piping to Sprinklers Below Ceilings. 5-13.20.1 In new installations expected to supply sprinklers below a ceiling, minimum I -in. (25-mm) outlets shall be provided. Exception: Hexagonal bushings shall be permitted to accommodate temporary sprinklers and shall be removed with the temporaly sprin- klers when the permanent ceiling sprinklers are installed. 5-13.20.2 When pipe schedule systems are revamped, a nipple not exceeding 4 in. (102 mm) in length shall be permitted to be installed in the branch line fitting. All other piping shall be I in. (25.4 mm) where it supplies a single sprinkler in an area. [See Figure 5-13.20.2(a). I Exception No. 1: Men it is necessary to pipe two new ceiling sprin- klersftom an existing outlet in an overhead system, the use of a nipple not exceeding 4 in. (102 mm) in length and of the same pipe thread size as the existing outlet shall be permitted, provided that a hydraulic calculation ve7iftes that the design flow rate will be achieved. [See Fig� ure 5-13.20.2(b).] Exception No. 2: The use ofpipe nipples less than I in. (25.4 mm) in diameter shall not be permitted in areas subject to earthquakes. CONTENTS: SITE MAP SITE PLAN ORCHESTRA LEVEL PLAN BALCONY LEVEL PLAN SECTION LEVEL PLAN ELEVATION LOBBY PERSPECTIVE AUDITORIUM PERSPECTIVE LMN PROJECT EXPERIENCE +h� A 40 to A Fil no F7 `* //'�// I/F%Wl I ILI t--jLjl L !fit, jj_ �,3 IF U!'_ mle ST, I . 'Ns OH AVE QUN SL %W *A Ing "0 Hl- '77 P T V 9 17 lo-1 Ti. IA., I I I i. �%)- 4.1 1 j jjj�j I-0 " Hm'bi- -X n rl rl J, 4 J- J :4 J-1y � jj L ` 71� U) c U) _0 c 0 E LLJ ITT- EMBE U) (1) C) U) C: 0 '0 LU oo�'� , OR LMN ARCHITECTS Edmonds C-enter for the Arts 1 MAY 2K4 LMN ARCHITECTS Edmonds Center for the Arts I MAN 2-D24 ME I'll"1W , " 0 tl U) C- C) U) 0 E _0 LU U) 0 w 5 All= Of, .11"Pi OIIMVAM� MIX FI 171 Performing Arts & Cultural Projects • Adams State College Theatre Department Building Alamosa,CO • Allen Family Technical Pavilion at Seattle Children's Theatre Seattle, WA • Bank of America Performing Arts Center Wenatchee, WA • Bellevue Performing Arts Center Study Bellevue, WA • Bellevue Crown Center Master Plan Bellevue, WA • Benaroya Hall Seattle, WA • Cannon Center for the Performing Arts, Cook Convention Center Memphis, TN • City of Edmonds Performing Arts Centre Study Edmonds, WA • City of Edmonds Performing Arts Centre Edmonds, WA • Dance Factory/Milwaulree Ballet Milwaukee, WI* • Door Community Auditorium Fish Creek, WI* • Ed Erickson Theatre Off Broadway, Central Community College Seattle, WA • Edmonds Centre for the ArtsEdmonds, WA • Edmonds Woodway Theater Edmonds, WA* • Eve Alvord Theatre/Seattle Children's Theatre Seattle, WA* Experience Music Project Seattle, WA Fifth Avenue Theatre Study Seattle, WA Front Range Community College Renovation & Addition Westminster, CO Glacier Performing Arts Center Study Kalispell, MT Henry Art Gallery, University of Washington Seattle, WA • Marion Oliver McCaw Hall Seattle, WA • Maryland Science Center Baltimore, MD • McComb Bruchs Performing Arts Center Wautoma, Wl* • McIntyre Hall Performing Arts & Conference Center Mt. Vernon, WA • Milwaukee Repertory Theater Milwaukee, WI* • Millennium Carillon Olympia, WA • Mt. Baker Theatre Renovation Study Bellingham, WA • Museum of Flight Expansion StudySeattle, WA • Museum of History and Industry Seattle, WA • Navy Band Facility Bangor, WA • New Music School, University of California, San Diego San Diego, CA • Northshore School District Performing Arts Center Feasibility Study Bothell, WA • Rancho Cucamonga Performing Arts Center Study Rancho Cucamonga, CA • Sacramento Community Center Theater Renovation Study Sacramento, CA • Sacramento Memorial Auditorium Study Sacramento, CA • Seattle Center Master Plan/Design Studies Seattle, WA • Seattle Pacific University Concert Hall Study Seattle, WA • Seattle Public Library Seattle, WA • Seattle Public Library Temporary Central Library Seattle,WA • Seattle University Auditorium Renovation Seattle, WA • Skylight Opera Theatre Milwaukee, WI* • Sundance Theatre Workshop Sundance,UT • St. Nicholas Hall Performing Arts Center Addition Study, Lakeside Seattle,WA • Syracuse Theaters StudySyracuse, NY • Theater X Milwaukee, Wl* • University of Florida Center for Performing Arts Gainesville, FL* • University of Idaho Music Center Study Moscow, ID • Wayne County Museum Study Wayne Counry, IN • Weidner Center for the Performing Arts Green Bay, WI* • Western Nevada Community College -A Center for the Arts Carson City, NV • Western Washington University Performing Arts Center Renovation Bellingham,WA • Wisconsin Lutheran College Fine Arts Center Wawautosa. Wl* * Sherrill Myers'experience prior tojoining LMN. Message Page I of 2 Westfall, John From: Westfall, John Sent: Wednesday, April 09, 2003 11:44 AM To: Smith, Mike Subject: FW: Building Official ----- Original Message ----- From: Cruz, Cindi Sent: Wednesday, April 09, 2003 10:54 AM To: Westfall, John Subject: RE: Building Official Nothing yet, this is the Ist meeting. We do have the preliminary concept that was drawn up last summer but it is very conceptual. You may review if you would like. ----- Original Message ----- From: Westfall, John Sent: Wednesday, April 09, 2003 10:28 AM To: Cruz, Cindi Cc: Smith, Mike Subject: RE: Building Official Cindi: Unfortunately I cannot make it, but Mike will be available. Are there' any plans or suggested proposals up to now? John ----- Original Message ----- From: Cruz, Cindi Sent: Wednesday, April 09, 2003 8:51 AM To: Westfall, John Subject: FW: Building Official John: We are meeting with Sherrill Myers, LMN Architects and Kjris Lund, PFI) project manager, Jeannine Graf and Ann Bullis on Tuesday, April 15 at 9:00 a.m. in the Fourtner Poom regarding the renovation of the Puget Sound Christian College now known as Edmonds Center for the Arts. Could you or Mike attend. This is a first step in design of the project. Cindi ----- Original Message ----- From: Sherrill Myers [mailto:smyers@LMNArchitects.com] Sent: Tuesday, April 08, 2003 4:46 PM To: Cruz, Cindi Cc: Clifton, Stephen; Kjristine Lund Subject: RE: Building Official Thanks, Cindi. Could you invite the appropriate person from the Fire Department as well please? Sherrill 4/9/2003 Message Page 2 of 2 ----- Original Message ----- From: Cruz, Cindi [maiIto:Cruz@ci.e&nonds.wa.us] Sent: Tuesday, April 08, 2003 3:52 PM To: Sherrill Myers Cc: Clifton, Stephen; Kjristine Lund Subject: RE: Building Official Sorry, I meant Tuesday, April 15. ----- Original Message ----- From: Cruz, Cindi Sent: Tuesday, April 08, 2003 3:34 PM To: 'Sherrill Myers' Cc: Clifton, Stephen; Kjristine Lund Subject: RE: Building Official 9:00 a.m., Tuesday, April 14, works best for Jeannine Graf, Building Official. Ann Bullis, Assistant Building Official will also be there. Who else would you like to attend? ----- Original Message ----- From: Sherrill Myers [mailto:smyers@LMNArchitects.com] Sent: Tuesday, April 08, 2003 1:49 PM To: Cruz@ci.edmonds.wa.us Cc: Clifton@ci.edmonds.wa.us; Kjristine Lund Subject: Building Official Cindi, We need to schedule a meeting for a preliminary discussion with the senior building official to outline our approach to the building renovation design and ask them for advice about how various requirements in the building code apply to this type of project. Can you arrange this meeting please? Ideal times for us would be: April 10 between Noon and 4:30 PM April 14 AM April 15 AM April 16 AM Sherrill 4/9/2003 i EDMONDS CENTRE FOR THE ARTS Business Plan ME 41() 4 f,(L "�v /V Prepared for the Edmonds Public Facilities Distdct Prepared by Lund Consulting, Inc. August 31, 2002 Updated October 3, 2002 Edmonds Centre for the Arts Business Plan 1. INTRODUCTION A. Background n April 2001, the City of Edmonds created the Edmonds Public Facilities District (PFD) to study the potential development and viability of a regional center The Edmonds City Council appointed the 5-member PFD board in June 2001. The board includes members with experience in real estate development, marketing, economic development, project management, and the arts. The PFD completed a Market Demand and Feasibility Study in November, 2001 for the facility and explored potential locations. During this process, the Puget Sound Christian - College (PSCC) property in downtown Edmonds was placed on the market for sale. Im- pending sale and probable demolition of the historic buildings focused the PFD on the importance of acquiring and redeveloping the property. The PFD completed a Business Plan in April, 2002 to detail the purchase, renovation, and operation of the PSCC site as a regional arts center. That Business Plan was updated over the summer of .2002 to include up-to-date cost estimates, fundraising feasibility, rental viability, user group interest, and operating costs. B. Vision The Edmonds PFD defined its vision as the creation of a high quality regional center which includes a performing arts facility, meeting rooms, and gymnasium for the local and surrounding communities. After a process of site and development alternatives evalua- tion, the PFD decided to purchase and renovate the buildings at the former campus of the Puget Sound Christian College. The PFD's prime objectives are to provide a performing arts facility for community and regional arts groups and presenters, to preserve a well - regarded historic structure, and to enhance the cultural life of the community and region. The PFD intends td carry out a two-phase project Phase one (a) is to renovate th6theatre and.to create on -site parking. The existing gymnasium and an existing music practice building will be retained in the development. Phase one (b) will add modern sound and lighting equipment as well as new balcony seats. Phase two is the addition of a meeting room large enough to seat 500 people in a dining configuration and a roof garden that will overlook Puget Sound and the Olympic Mountains beyond. This new meeting room wing will be located on top of a three-story parking -garage adjacent to the north wall of the theatre. Located near downtown Edmonds the Centre for the Arts will be an appealing place to att ' eM performances and other events and to enjoy amenities of nearby restau- rants, shops�; 'and cafds, a short walk away. 2 October 3, 2002 C Competitive Advantage The City of Edmonds has an attractive downtown retail core with many restaurants and retail shops. The downtown is clean and safe for pedestrians. The Edmonds Centre for the Arts has the advantage of being located within walking distance of these shops and restaurants making it appealing for patrons of events. The Puget Sound Christian College is the former Edmonds Junior and Senior High School property. These landmark buildings represent one of the finest examples of the Arte Moderne School of design in Washington'State' and are listed on the Washington Heritage Register. The school is a recognized landmark in the community and graduates of the school are actively interested in plans to preserve it as a regional arts facility. This historic ambience lends character to thetentre for the Arts and provides an institutional memory to firmly: root the facility in the region. This Centre for the Arts has an existing pool of users who intend to continue using the facility in the future. -This provides revenue and anchor tenants that can help reduce operating deficits as the facility transitions to a more up-to-date facility. Partnership opportunities exist with the City of Edmonds and the Edmonds Community College that offer benefits to the community through reduced operating costs by sharing administrative services as well as benefits of creative and engaging programming using the expertise and reputations of these organizations. Opportunities exist to phase this project to match capital investment to available funds, including a compelling vision for a second phase. By effectively managing the risks associated with this project (as with any capital project) residents of Edmonds, South Snohomish County, North King County, and the Kitsap Peninsula will gain a performing arts facility that is designed for the region's specific interests and that will meet the community's cultural needs. When the Edmonds.Centre for the Arts opens -its doors in 2005, audiences from throughout the region will experience the full force and brilliance of music, dance and theatre.Through the vision and leadership of the City of Edmonds and Edmonds PFD and Snohomish PFD Boards, as well as through the generosity of community supporters, audiences will enjoy one of the finest performance.halls in the region. 3 _U1 _;4. Ui.4 Edmonds Centre for the Arts Business Plan 2. CAPITAL PROGRAM A. Recommended Phase I Program The PFD retained LMN Architects to develop a design concept conceptual cost estimate, and phasing plan to accomplish the Centre for the Arts vision. LMN's work product is available for review through the City of Edmonds in two separate volumes: "Concept Design and Budget Report" and "Appendices". LMN concluded this project will require major renovation wor I k to the theatre and demotion of unusable buildings on the north side of the theatre to create spa'ce for on -site parking and additional lobby space. The theatre, built in 1939, needs signifi- cant renovation in the front of house public areas, in the auditorium',.and in the back of house areas as well. Both the front of house and backstage areas will be retrofit- ted to meet the requirements of the Americans with Disabilities Act (ADA). The renovations will preserve the architectural integrity of the original auditorium while creating a first-class theatre with 725-750 seat capacity, improving the stage, and install- ing modem sound and lighting systems. The design will ensure both listening intimacy and visual appeal. N ew seating will be provided in the orchestra level of the theatre and to improve sight lines a more steeply raked floor will be added at the orchestra level. To improve acoustic characteristics and to provide acoustic flexibility, the sidewalls in the front part of the house will have elements added to improve sound diffusion and to incor- porate acoustic draperies for use with amplified sound. Inadequate stage wing space will be remedied by demolishing the lower portion of the stage house wall and incorporating *a girder to support ' the remaining portion. Theatrical system upgrades will be added when funding is available. Dressing rooms a greenroom, back -of -house support areas and a loading dock will be added to make the theatre fully functional. The gymnasium will be retained and used for long-term rentals and some special events. The music buildings will be retained for rehearsal use. T . he classrooms will continue to serve as meeting-room5 for smaller groups On -site parking with landscaping will be added for 90 cars. In tegrating cultural develop- ment strategies with economic development the Edmonds Centre for the Arts will attract People, organ"izations and new businesses to the city, which will stimulate the local economy. The� Centre is expected to host 110 events by its fifth year of operation, drawing about 45,000 attendees by 2010. To manage additional parking needs, the PFD will work with the city to develop a parking management plan that will use nearby existing parking lots. In addition, the PFD will work with the city to consider a residential parking zone for the benefit of nearby residents. October 3, 2002 The PFD has already held preliminary discussions with the City of Edmonds to outline the permit process needed to accomplish this project. The PFD will apply for all necessary permits including a conditional use permit and master plan. Permits will be needed for demolition, surface parking, and other site improvements. SEPA and traffic mitigation are expected to be required. Renovation Summary The renovation will include: seismic retrofit ADA retrofit; increased lobby space; new toilets; new seating and improved site lines; acoustic improvements; back of house improvements; increased wing space on stage; new HVAC system; ne I w electrical power including power for theatrical productions; cosmetic improvements to existing meeting rooms on second floor of theatre, power and data upgrades to second floor meeting rooms; loading dock, and a *new landscaped surface parking lot for 90 cars. Modern theatrical systems, equipment upgrades, new sound and light systems, and new balcony seats will be added -when funds become available. B. -Phase I Capital Costs Phase'I capital costs are detailed in the August 31, 2002 Appendices to the LMN Concept design and Budget Report. Soft costs are detailed in the August 31, 2002 Capital Budget Report prepared by Kymera Industries and are appended to this reporL . SUMMARY Theatre renovation and'site work $6,862,940 Acquisition 4,050,000 Hazardous materials cleanup 795,656 Soft costs 3,818,764 Total Phase I (a) Theatrical systems, lighting, sound system, balcony seating, and associated soft costs. TOTAL PHASE I (A) AND PHASE 1-(B) $15,527,360 $848,495* (The PFD W11 priaitize these expmses to fit within budget) $16,375,855 C. Phase I Capital Fund 50tirces The PFD retained Kymerj' iIndustries Inc. to develop a capital . budget that shows sources and uses of capital funds. This report is available for review at the City of Edmonds. The report includes a summary capital budget; a projected capital budget cash flow for 2002- 2005; bond proceeds and costs; and a potential ticket levy revenue stream. i + 0 EDMONDS CENTER FOR THE ARTS MASTER PLAN CITY OF EDMONDS PUBLIC FACILITY DISTRICT n, "'a' LMN Architects Edmonds Center for the Arts Master Plan Contents INTRODUCTION Mission of the Edmonds Center for the Arts Scope Site Location & Current Land Uses Phase One Development MASTER PLAN OBJECTIVES — Phase Two Phase Two Development Site Development Standards Lot coverage Heights Parking I , I INTRODUCTION The Edmonds Center for the Arts (ECA) is a center established by a partnership between the City of Edmonds, Snohomish County and the Edmonds Public Facilities Districts (PFD) and Snohomish County under an inter -local agreement. The PFD is the administrative partner responsible for developing the ECA project and is currently managing the facility. Mission The mission of the Edmonds PFD is to provide a venue within the community to showcase local performing artist� and arts organizations, public lectures, presentations, and a place where performers and artists from outside the community can be brought to Edmonds to enrich and to provide variety to the local arts scene. There is also potential for events that include performances or large lectures combined with meetings or banquet activities. Additionally, the mission is to provide a multipurpose gathering place to promote a variety of programming related to meetings, recreation and special events. A compelling reason for carrying out the Center for the Arts project in addition to its artistic and cultural benefits, is the economic development related activity that the project could generate. Scope Located on the site of the old Edmonds High School,, the site is the ideal place in Edmonds to provide a home for the type of activity described above. The project is planned to occur in two phases; the first phase is the renovation of the existing theater facility and associated spaces. The existing, attached gymnasium and the existing music practice building will be retained as community use facilities. In addition to arts related activities, there is a wide range of social, cultural and community activities that require space for up to 500 hundred people that presently cannot be accommodated within the City. The second phase will be the creation of a new community gathering space to serve as a venue for large events such as speaking engagements, wedding receptions, fund raising events, banquets seating up to five hundred people and other special events. SITE LOCATION & CURRENT LAND USES The Edmonds Center for the Arts is located within buildings that were built to house the original Edmonds High School, located between 6th and 4th Avenues North, Daley Street along the south edge and residential properties along the north edge. There are six buildings on the site, two of which are free-standing; the others are physically connected. Structures include the original Edmonds high school building and its attached cafeteria and shop wing as well as the circa 1939 historic theater and attached gymnasium. Also on the site are the music building and the north gymnasium, both of which are 1960's era free-standing structures. There is a change in elevation from 6th Avenue N. to 4h Avenue N. of approximately fourteen feet with the site sloping down from east to west. The original school building is on the State Register of Historic Places and the 1939 era theater and attached gymnasium are identified as contributing structures. The site is zoned Public (P). 4 PHASE ONE DEVELOPMENT Extensive renovation work will take place in 2004 and 2005 to transform the existing auditorium into a first class performance hall and other areas of the existing structure to create a multipurpose facility. Most of the work will be confined to the historic theater and its back -of -house wing located to the east of the stage house. Demolition of existing structures north of the auditorium will also be demolished to provide much needed parking. The attached gymnasium will be retained, however improvements will be limited. The music building will also be retained; however, improvements to that building will not take place until funds are available for its renovation. Auditorium The most visible and striking feature of the existing campus is the 1939 era theater. It faces west separated from 4th Avenue by an expanse of lawn that slopes up towards the building. Art deco in style, its main fagade is a convex shaped wall flanked on each corner by entrance towers that are articulated by two-story high pilasters. The theater will be painted in a new color scheme. Existing entrances are planned to be retained and accentuated by a color scheme that is consistent with the Art Deco style. The entry configuration is proposed to be enhanced further by creating a new walkway that will start near the corner of 4th and Daley and lead to the entry doors in a sweeping curve framed by a low concrete wall. This wall will begin at sidewalk level and increase in height as it nears the entry. The wall portion in front of the building will be of a height that is comfortable for sitting. It is anticipated that during intermissions in fine weather, many audience members will be attracted outside by the view of Puget Sound and the Olympic Mountains. This entry walkway will extend northward and connect to a new parking lot constructed on land occupied formerly by buildings that are to be demolished. This parking lot will provide eighty spaces supplemented by ten along the 6th Avenue'side of the building for a total of ninety on -site parking spaces. Back of House The new two story wing that Will be added on the north side of the building will house new restrooms, mechanical equipment rooms and two principal dressing rooms that will have their own internal showers and toilet facilities. The back of house renovation of the existing first floor classroom/changing room wing will provide three chorus dressing rooms, a green room, a production office, a wardrobe and laundry room and associated toilet and shower facilities within the existing spaces. On the second floor, a minimum amount of renovation will be carried out to provide two meeting room spaces and an office area to serve the administrative staff of the facility. Two new exit stairs will be provided in the back of house area to meet code requirements for exiting. Loading access will be provided from the new parking area at the stage door entry at dressing room level and at the new addition. This latter location will provide loading access that is level with the stage floor. Parking Presently, there is no on -site parking for patrons who attend performances in the theater. Existing structures on the site north of the auditorium will be demolished to provide surface parking spaces for patrons and users of the facilities. Although there is no change of use that would trigger a requirement for on -site parking, it is proposed that 90 parking spaces. be provided on site. That number combined with 99 available parking spaces at nearby parking lots owned by the City of Edmonds would provide the amount of parking that would be required if a new theater of this size were built on the site. I I PHASE ONE DEVELOPMENT -V WEYLAN, 4IM A.VE.- . . . . . . . . . . . . . .... C9 11.1 uu Iii WM OF UM MUM cs '61H mot CUXIST.- MASTER PLAN OBJECTIVES — Phase Two The objectives of the Master Plan are to provide the framework for the future development of a regional public facility in the form of an assembly space for meetings, conferences, banquets and similar functions on the Center for the Arts campus for the benefit of the Edmonds and Snohomish County community. Phase Two Development The elements of phase two are anticipated to include a multi -floor parking garage for 248 cars built into the slope of the site with one or two levels above grade. The meeting room facility is planned to be located on top of the garage structure and to feature a roof terrace park that will provide outdoor gathering space overlooking Puget Sound and the Olympic Mountains. The proposed development is permitted under the Public zoning classification of the Edmonds Community Development Community (ECDC) 16.80.010(A)I. A conditional use permit is requested for two items of the Site development standards of ECDC 16.80.030 as described below. Lot Coverage Concept The area of the existing site is approximately 109,000 square feet and there is approximately 57,000 square feet of structural and pavement lot coverage, equivalent to 52% impervious coverage. Under ECDC 16.80.030(C), the maximum lot coverage by buildings and other structures allowed is 35% unless a conditional use permit ' is obtained. The Public Facilities District proposes that the roof terrace park that will be approximately one story above the existing grade at the theater entrance be considered as part of open space and not be considered as part of lot coverage. With this proviso, it is proposed that maximum lot coverage be set at the present coverage of 52% for Phases One and Two. Height Envelope Concept The site is designated as Public Use according to the City's Comprehensive Plan and is also zoned Public. As such, the proposed phase two development of a meeting room and garage development is subject to a height restriction of twenty five feet unless a conditional use permit is obtained. The existing school building that will be demolished to provide a site for the phase two development is forty seven feet in height. Under ECDC 16.80.030(B) a maximum height of 65 feet may be allowed for buildings in a Public zone. Sensitive to neighborhood considerations, the Public Facilities District proposes to limit the height of phase two buildings to a maximum height of forty seven feet, the same height as the existing maximum building height of school structures to be demolished. � I HEIGHT ENVELOPE CONCEPT PLAN PARKING The Edmonds PFD proposes to provide 7,500 square feet of public assembly space within the phase two development. ECDC 17.50.020(C)3 requires that one parking space be provided for every 40 square feet of assembly area; that equals 187 spaces. Phase One Phase One required parking 0 parking spaces Phase One on -site parking provided 90 parking spaces Parking spaces available in nearby City parking lots 99 parking spaces Total Parking Spaces Available, 189 parking spaces Phases One and Two Phase One requirements as part of Phase Two development 160 parking spaces Phase Two requirements 187 parking spaces Total Spaces Required 347 parking spaces Phase Two parking garage Parking spaces available in nearby City parking lots 248 parking spaces 99 parking spaces Total parking spaces available for Phases One and Two 347 parking spaces LMN ARCHUECTS 801 Second Avenue Seattle, WA 98104 (206) 682-3460 9 C punt "OKS'EdMon a Ce" e B t ity's O�ibhc facilitie's dis amount and an additiona d $2- Iasi week about funding u" tl�e­c­ triCt has tO million that he�7,ol Edmonds ect. the prqj- posal on the table as a yes or no, ns g the county district added a third -ecently ple purchase At that meeft Edmonds PFD -option — a -conditional meet six 60nditio befoiethey'll be able to r -d receive $5.7 1 and.. renim yes, I�fllion-m state sales tax te a. former high chairTerryVehrs told county dis- which c district members Mo"Y' au torrumandgymnasi-:, trict meifiberi that die 92�-seat - �d fi - ­ ' school di ounty., JANICE PCIIISAD , A 1", m6fids�* urn located on the campus vote orunammouslyMon&y. of the auditorium "uld require about Conditions,- and target . tes HeraidWitei� former:PUget Sound Christian $5.9 million in improvements, da But the PFD in i - ' in- weredraftd us meet six College, over the weekend by conditions by the end of the year cluding. seating, fighting and members of both groups. , But. the total, $7.7 million, 'is, stage renovations, bring it up to EDMONDS The Edmonds in order to receive $5.7 minion m, �onlyen 0 By June 15,'the 9dmonds_ et ough to purchase the two muff PFD Public Facifilles Distri received state sales- tax rebate funds from, facilities and pay for an un — features that would at- must outline the scope of the conditional appioval -from the the county district, formed to dis- der- tract :rriajor performing arts project to the county district. The Snohomish 6untyPubhc Facili ground parking garage. it does group&, - . . . - , pFD tribute those funds to local PFDs, not pay for an eitensive renova- Those renovations would ' "" to p ties District to proceed with plans including those in Lynnwood, tion. have lo to create a regional performing Everett and Edmonds. to be paid for with private dona- bLping . . I - For that reason, countydistrict tion&_ arts center near downtown Ed- The PFD plans to use. that tirembersexpressed reservations But instead of putting the Pro- See FACILFIY Page & 'V� Facil.ity.: Coutq OKs arts center From Page B1 chanical and electrical code, and improving parking facilities. At that time, the PF]D must also de- scribe its plans to -renovate the auditodurrYs lighwig, seating and acoustical features. . - 0 By June 15, the PFD must re- ceive formal approval of the plan from the Snohomish County Council. N ByAug. 3 1, the PFD must com- plete a detailed business plan that includes annual revenue projections and letters of intent from local performing arts com- panies that plan to use the audi- torium for performance& 0 By Aug. 3 1, the PFD must also complete a financial plan that de - tans long-term financing and proposed sources of corporate and private funding. 0 By Sept 11, the PFD must sign an agreement with the Edmonds PFD, the city of Edmonds and the courtty detailing the role and fis- cal responsibilities of the part- nem N By Sept 11, the PFD must have purchased or be in the process of purchasing the auditorium and gynL You ran call Herald Writer Janice Pbdsada at 425-339-3029 orsende-mail to * podsadafteraldnet.com. a I n an v il" ges un ing. ..o e J. nvert a former in Edmonds into titment from t 0 A�`p gh school au a nancial'comn ihe.! ci1Rf Edmonds, Clenterass; r d jr��on� s ci�nie� A en o a eEdmonds ��7�.boa4s decisi � I art is propos .3he Snohornis C ing to purchase e auditorium will'i po' ip 'i �D PT to d the $7.7, eict is not viable,' Cl th .: will P9. errients Sal and gym on the campus of the _d ciditetJZ"rt* t e e �;."However,it may be viable 10 six former Puget Sound Christian Edm, u d �V=t; o�ard' hastbree months if x Y, z are in order College near downtown Ed- ZD orjdi ��blic,OF�fciniiti The Edm.n. t (today) monds for $6.5 million from �!qgtwi�j,pe C. I . !c�,v9teyes,v?tenoorvore .. re meL gt,�.p.T� o��-�, -Publi' Facilities District will find go Y, Z out Monday if its I thO project on a con out h:Xg are- We= Covenant Construction Manage- !,,qay iPQP�7 Aans to conyert,� basis J��k�qrt 0 rd- tingencY i and fund the Oroj- fi a former high school auditorita* ... - .gure out what steps have to be'�' ment, .a Lynnwbbd developer. .�.rq .6ci down the road if it meets a set Rnldit�e Snqhp :!'� ri et before it can be funded.".",-, . The purchase price also includes ',-.-.Coun Adgll�is andigy'nutasiurn into a regional of conditions, which -- - , I qftry* 0 t � ibe ",",'111ose steps would likely:iii-, construction of an underground -�,B641%;.�000. o �efelle'K� performing arts c�nter will five, determJnted; said frho dude a purchase and sale agree- parking garage. -�,Virin Everett. Public,coiriTil" ,',die ofl1impaJ9n'g..,!.,,�,-, _.COUhty: finance director' Dan ment; a firmed - up agreement ber:,- .Z�6rit will 15e On Monday, the Snob6misfi. 'Clements. .,tween the developer and th6PFD See EDMONDS, !Pe�P tnow, eEdmondsproj-t' �as.t6whopa for County Public Facilities District Righ th ys what and a R backpage, thissection 4 Edm`o"":.nds,.m"Tif to M hes au nu, From Page B1 approve a, contingency agree7 T: cre ate a regional tj;;�v ��at at-+ I ment, �­ it, could keep- the, Ed- tracts:people and dollars from But Edmonds PFD members admitted Thursday it will cost monds'project alive. ' .."I think a lot of folks thought outside the community — in + this case the city of Edmonds. + another SS.9 million to renovate the 925-seat auditorium; a for- die Etirridiids PFD-was gom*g to .+-.die to I ��Mey I got a lease IT think the (Edmonds project) . rimarily a community facili-., mer high school facility, i onlifle,"Clements.sai d., . tY, OMIS said - "LO Loomis said she did not be Last week the PFD received a conditional pledge for $2 million expresse ' 4cL,� h to fund a 'Heve that'regional performifig; from, the Edinonds City Council.. p ject is not" hed," $7 'on arts companies such as the Seat- tie Symphony or the Pacific The money represents the one- third matching funds required by + p the auditorium and gym, pay for Northwest Ballet would stage at die county distria. Mondays de- -,construction of the underground event in a former high school aul, cision will dete . rrnine the late of the. additional S5.7 million. parking garage -and � bring the buildings up to m 'cal and ditorium. Fl) oard � But' Edmonds P .. b which,the county district Will electrical code,,but little else An su million is need ed members and local arts support.-�- ers told the county district they. vote to & to"or withhold from the Edmonds PF1). The county additional to add the razzle-dazzle. have begun an aggrn sive cam-! district was formed to distribute state sales = rebate funds to lo- , Without e3densive renovation, the auditorium and gym can't be paign to raise the necessary� funds to cover the $5.9 miffilon, cal PFDs, including +those - in considered a viable regional per- renovation. Lynnwood,' Everetti and Ed- . forming arts center, said county board member Liz Loornis� You can call Hemld Miter m onds. Without the money, the proj- PFD legislation is airn6d at economic-, develop- Janic� Podsada at 4?-5-339-3029., or send e-mail to podsada@ ect is dead. if the council votes Monday to . spurring ment,; which. requires PFDs to hera.ldnetoom Date: To: From: Subject: EDMONDS FIRE DEPARTMENT MEMORANDUM April22,2002 FM Smith Thomas J. Tomberg, Fire Chief PFD, Puget Sound Christian College, Etc. Enclosed are the draft minutes from the 4/16 Council discussion on providing 2 million dollars to the PFD to purchase and renovate portions of the Puget Sound Christian College, and the Herald article reporting same on 4/18. Please read the minutes paying special attention to the circled areas. Stephen Clifton advised me that Jeannine Graf and Ann Bullis had walked through the structure and would be contacting you. I am concerned with bringing the structure into code compliance for future use (whatever that may be) and the costs that might involve. Using. "no surprises" as our guide, I want the Mayor, Stephen and the PFD Board to have an general understanding of public safety code compliance upgrades (from the second and third floor) and their costs so the independent PFD Board and the City can make informed decisions about the future of the site. Thanks. Please place this memo and the enclosures in the appropriate file for future reference. Enclosures C: Mayor Haakenson (w/o enclosures) Director Clifton (w/o enclosures) OFFICE OF THE FIRE CHIEF Tomberg, Thomas To: Haakenson, Gary; Clifton, Stephen; Bowman, Duane; Graf, Jeannine; Bullis, Ann Cc: Smith, Mike; Taylor, Kevin Subject: Puget Sound Christian College 4/25/02 Enclosed are Fire Department preliminary comments re the future development of the Puget Sound Christian College complex. Thanks. TT and MS. WDF Puget Sound Christian College.... Date: To: From: Subject: EDMONDS FIRE DEPARTMENT MEMORANDUM April 25, 2002 Mayor Haakenson, Director Clifton, Director Bowman, Building Official Graf, Assistant Building Official Bullis Thomas J. Tomberg, Fire Chief Mike Smith, Acting Fire Marshal PFD and the Puget Sound Christian College As mentioned at the April 22 Director's Meeting, Fire Department review of the draft Council meeting minutes and accompanying Herald article re PFD and tentative plans for the Puget Sound Christian College prompted interest in the current structure. Acting Fire Marshal Smith has walked through the complex and in the context of "no surprises" for the owner/developer, PFD Board, and/or the City respectfully offers the very generic and very preliminary comments below. At the 4/22 Director's meeting Director Hetzler referenced circumstances in which the City could be an owner of part of the structure. If that is the case, the City needs to understand the extent of costs associated with refurbishment and bringing all or part of the complex into code compliance. Although nothing below is news to Jeannine and Ann, the Fire Department wishes to place our concerns on the record. Without knowing specifically what parts of the complex will remain, whatwill be demolished and/or refurbished, and the associated issues of code compliance the following are Fire Department comments regarding the complex. 1) Upgrade the existing fire alarm system to bring it into compliance with NFPA 72. 2) Sprinkler heads 50 or years older require replacement. Earthquake bracing is required on piping, and the build-up of scale in piping needs to be evaluated. Additionally, portions of pipe should be dismantled and inspected for deterioration. Modifications to the building interior require modifications to the sprinkler system coverage. 3) In a building of this vintage it is common to find problems with the electrical wiring and electrical panels. 4) The stairwells open from floor to floor need to be enclosed to reduce smoke and fire spread. 5) Additional exits from upper floors are required to meet code requirements. OFFICE OF THE FIRE CHIEF 6) The kitchen hood, suppression system, and all appliances must be brought up to code. 7) The building is required to meet ADA requirements. 8) The boiler and all piping used for heating need to be evaluated. 9) Many buildings of this era have galvanized pipe for water needs. Often times if copper pipe was used a lead free solder was not. A plumbing inspection and water sample check for contaminants and quality is advisable. 10) Wall coverings of lath and plaster are common throughout the structure. When rewiring for electrical or fire alarm upgrades, it is easier to use external mounted conduit instead of disturbing plaster. If this is not possible or practical, the replacement of old lath and plaster with sheet rock (fireboard) is an additional expense. 11) The structural integrity of the building should be verified for seismic safety. 12) The condition of the roof and minimum R-value code requirements for windows is another concern. Thanks. TT and MS I-�� - - �- Tomberg, Thomas From: Smith, Mike Sent: Wednesday, April 24, 2002 3:23 PM To: Tomberg, Thomas Subject: FW: PFD, Puget Sound Christian College I added items 11 and 12 as after thoughts. I think this should be enough. ----- Original Message ----- From: Smith, Mike Sent: Wednesday, April 24, 2002 3:02 PM To: Tomberg, Thomas Subject: PFD, Puget Sound Christian College Without specifically knowing what parts of the complex are staying and what would be demolished I will speak in terms regarding all the buildings. 1) Upgrades to the existing Fire Alarm would be needed bringing it into compliance with NFPA 72. This would involve a whole new system. 2) The Fire Sprinkler system appears to have been in the building for quite some time. Sprinkler heads 50 or years older would need to be replaced. Earthquake bracing would need to be installed on the piping. I question how much scale has built up in the pipes over the years. Portions of the pipe should be dismantled and inspected for deterioration. Modifications to the building interior mean modifications to the sprinkler system coverage. 3) On a building this old you usually find problems with the electrical wiring and electrical panels. A worse case would be a complete re -wire. 4) The stairwells are open from floor to floor. These would need to be enclosed reducing smoke and fire spread. 5) 1 spoke with Ann Bullis about exiting off the upper floors. Additional exits would be required to meet code requirements. 6) If the kitchen stays code compliance would be required for the hood, suppression system, and all appliances. 7) The building will be required to meet ADA requirements including access, bathrooms, exiting, etc. 8) Buildings this size have boilers for heating. The condition of the boiler and all piping will need to be reviewed. 9) Buildings of this era usually have galvanized pipe for water needs. Often times if copper pipe was used a lead free solder was not. A plumbing inspection and samples of water for contaminants and quality would need to be taken. 10) Wall coverings of plaster and lath are common in the building. When rewiring for electrical needs or fire alarm upgrades it is often easier to use external mounted conduit instead of disturbing the plaster. If this isn't possible or practical, the removal of the old plaster and lath and replacing with sheet rock (fire board) is another expense and a big mess. 11) The structural integrety of the building should be varified. It should also be checked for seizmic compliance. 12) What shape is the roof in? Do the existing windows meet minimum code requirements for R-value? If the City is serious about spending money on this building I would request from specialized engineers reports relating to what I have mentioned. These are high dollar items and their condition should be confirmed prior to a money exchange. jile Herald z"Tliursdayj April 18,;2002 B3 Ediii ds b d art diStoveredffiat�tfieppbr ec claimin& our in- .;:.'the total PFD revenues $7.7 con -u 'We are pro 0, The million, 'the city is � then tentIbilhe PFD'to g6forwaid," million ---will-be used to'ptir. the $2 approves pa:_$!! inffioxv.'� council,- �resi&nt'Ddve chase.* and':rendvateja'925-seat legally obligated to make up any,� said. audit6nuni and gym orithetarn-..-annual R deficit from the". operatin request bufinsists on.' Coimcil members also learned pu� bf-*the� former collego. near pe orn ung arts center.. - a bus m*ess plan from..,-. - that thepurchaser, of the former downtown Edmonds. But Conner said rnakirig't4e:� PugetlSound Christian College, The two facilities will form the. city paywould be the Iast resort". s 'iA4ide, the auditori d: nterpiece of the PFD's planned uld ' litit: 'revenues t�e,­.ta d ' i�t um.:an gym . -cer e w10 so ans to buil - pe0ofming arts center. frdrn� the 'arts mmunity�'and are located, pL d affprd� 1co able 'se" � -housing- on' the- r6- The PFD plans op, e grants to n- BYJAMCEPO'DSADA mor to"devel th cover anv deficit," Co' Hera"Writd:� mainder of the site. formercollegeinconcertwitlithe ner's'aid. Nowthe Edmonds PFDwfflbe purchaser, Covenant Constru6 She said the.operating deficit EDMONDS.�.The city council able - to, show, the Snohomish tion Management, a Lynnwood would run about $50,000 the first., .approved A request aboutniid-,: Cbunt�,.Pubi,i6',FacUities'District developer, w6ich paid-$6.5 mil- fewyears. The PFD wants to open: lit e he E ond Friday that it has A conditional $2, lion for the prope' the arts center by 2004., t s '��y * i tri fo 2 million guarantee from the city., Peter Frame, a partner with 'of Edmonds, 'T Lgb Fascilit D ss c�rn r_ Under the county's PFI) dead- Covenant told the council his whoo p c iZ . d on in city nd ppose the PFD's plans, re Council members voted unan- line, the Edmonds PFD had until firrn plans to construct a 160- unit minded.council members that imously to conditionally approve,' Friday'to come -up,owith'the $2 affordable. senior housing corri- the � city's debt' is the taxpayer's the PFD's request'Council mem- million.-.Withoutthat,� the -Ed� plei and 240-unit underground debt: -A" ber Richard Marin was absent.'. mondsPFD wouldift have been parking garageionth6 site;, 160'of "Revenues are iff Otherwise 'for Under' conditions set by the eligible to—receive.$5.7 imillion those�, stalls will'b6 � available you folks are' 'on ihe'hooks for it e and we,,. council, no 'money will be given' from t6_cqunty PFD. the county Attstenterpatr6ris. (th'deficitj' , thus so are' until the PFD provides the city district was formed to distribute Covenant is asking the PFD for Trenkamp said. 'with detailed information on it state'sales tax rebaie.ftin & to lo an' estimated $3.8 million for the plans to convert . a local auditori- cal Pfljsi', including Lynhwop'd,. auditoritirriand ni'andan6th- You can call H�raid Writer. gym" tun and gymnasitun into a per-:� , EverettAnd Edmonds.`- er $2.7 million to. �oriftruct the'. jah ice Podsada at 4�5-339-302§ forri-Ang arts center, and submits,: Edmonds PFD board niethber.., undergroundparking garage. orsende-nuziltopodsidag, aviablebusiness 'plan. Jan Conner .1 told the council that On the'down side, the cotificl heraldnetcoriz.. Parks' property rights and was hopeful a recommendation would be presented in the future at did not ha e a fatal flaw. e a 'ata' "aw Cou cilmember Wilson indicated he would also support the motion and concurred with Council Presi nt Earling's statement. He noted in the original application, there was a e/onceptual plat layout s I ed tho. X that allo ed those reviewing it to visualize the layout on the property. He sai7without similar analysis I % of the prop sed amendment, the assertion that development was not fea unless that condition was r n emoved coul ot be deemed a factual statement. Councilmember MNvson echoed Council President Earling and Co/uncilmember Wilson's comments, particularly the hopetkat this.property would be developed in a/manner that was consistent with the neighborhood. She agre no information had been presented tdat indicated whether the 21% maximum t lot coverage was appropriat She noted the Council previously approved the contract rezone with a 2 1 % 'i w max mum lot coverage and \sh was not comfortable ch ging that decision without a great deal more information. 7 Council President Earling clarified thf4roperty w X suitable for and should be developed as a PRD. He pointed out developing the property square foot lots would require homes that were a dramatic contrast to the neighborhood. W, MOTION CARRIEED (5-1), COUNeILMhMER PLUNKETT OPPOSED. 7. AUDIENCE COMMENTS; \ed \ \*� t c Mayor Haakenson advised pub i comment would be ac epted during Agenda Item 8 concerning the Public Facilities District., Co cilmember Dawson expresse concern this had not been announced as a public hearing and many p ple, including the neighbors, were ot aware that public comment would be 13 j accepted. Although she eed it was important to allow public c ent, she emphasized this was not a public hearing. 17 Roger Hertrich I ,,A020 Puget Drive, Edmonds, referenced the City's,,,,contract with the Edmonds Alliance for EXnomic Development, and expressed concern with the role tbcAlliance has played with regard to lopKying efforts at the City level to double density downtown, increasb�uildin . g heights in the bowl area y one floor, and reduce parking requirements. He commented it was now-611Vous that he was righ�t; t . tourism and marketing contract were not in compliance. He suggested the Ci 'Nil) request an audi of all moneys granted to the Alliance each year, approximately $30,000 since 19, toNletennine 0 h 0 it o it was spent and whether the expenditures complied with the contract, and 2) require the A-Nnce w e turn v 11 turn any moneys that were illegally spent. He urged the Council to take action. 8. REQUEST FOR MATCHING FUNDS TO HELP THE EDMONDS PUBLIC FACILITIES DISTRICT PURCHASE AND RENOVATE PORTIONS OF THE PUGET SOUND CHRISTI COLLEGE Mayor Haakenson explained the Puget Sound Christian College (PSCC) was put up for sale some time ago and the City had the Right of First Refusal. He asked the City Attorney whether the infon-nation covered by the Right of First Refusal including the offer presented to the college was public or privileged information. City Attorney Scott Snyder answered the Right of First Refusal was a City contractual right and was recorded in the City Clerk's Office. The Right of First Refusal was a required legal step in exercising the rights under that document. Both the Right of First Refusal and the notice to the City to exercise its Right of First Refusal as well as the attachments to the letter were public documents and subject to disclosure under the Public Disclosure Act. Edmonds City Council Draft Minutes April 16,2002 Page 12 Mayor Haakenson explained while bids were being accepted by the PSCC, he met with three potential purchasers who ' inquired about the City's interest. All three were told of the City's desire to keep the auditorium and gymnasium, all three agreed that was something they would like to do, and all three were directed to the Public Facilities District (PFD) as the appropriate body to partner with. Mayor Haakenson noted all three were interested in concessions from the City including relaxing height restrictions and density restrictions in order to build on their portion of the site. He noted that once a partner was identified the purchaser would still need to return to the Council to request any relaxation in height and density regulations. Because there had been a great deal of discussion in the publi . c regarding who the purchaser was and what the price was, and because Mr. Snyder indicated it was public information, Mayor Haakenson advised he received a letter on March 4 from the Anderson Hunter law firm stating that the PSCC had received an offer to purchase the property for $6.5 million. The offer was acceptable to the PSCC and subject to the City's Right of First Refusal. Attached to the letter was an offer made by Peter Frame, Covenant Construction Management Inc. Mayor Haakenson explained he presented that offer to the Council in Executive Session and the Council declined to exercise the City's Right of First Refusal at that price and suggested the potential buyer meet with the PFD Board. Community Services Director Stephen Clifton explained the Council formed the PFD Board in April 2001 and charged them with exploring and determining the market demand for and feasibility of developing a regional center. Since their formation, the PFD Board has been conducting due diligence activities which included hiring Property Counselors to prepare a Market Demand and Feasibility Study which was completed in November 2001 as well as a Business Plan which was completed in January 2002. He recalled the Edmonds PFD and Property Counselors presented information about the Market Demand and Feasibility Study to the Council on November 20, 2001, and presented information regarding next steps on January 15, 2002. Mr. Clifton explained as a result of preparing the Study and Plan and conducting numerous PFD Board meetings, the Board chose to work toward creating a regional center utilizing the old PSCC site. The Edmonds PFD Board was here tonight to request matching funds in the amount of $2 million to help the Edmonds PFD purchase and renovate the auditorium and gymnasium at PSCC. Edmonds PFD Board Member Jan Conner explained the Market Demand and Feasibility Study concluded that an Edmonds Event Center was feasible but not without significant challenges, primarily financial. In January 2002, the PFD published a Business Plan that envisioned the Event Center located on property currently owned by PSCC. She explained the PSCC housed the Edmonds High School for several decades, featured distinctive art deco architecture, and contained the only large auditorium in South Snohomish County. Since the publication of the Business Plan, the Board has attempted to address concerns expressed by citizens regarding the impact, traffic flow, and parking issues. Ms. Conner explained another issue that arose from the Business Plan was operating performance. Prior to the PFD Board's meeting with the Council Finance Committee on April 9, the Board requested Greg Easton, Property Counselors Principal, review and revise the Edmonds Event Center Business Plan based on new information and operational scenarios. Ms. Conner explained that when the Edmonds PFD was formed, it became eligible for a rebate of state sales and use tax which has a projected present value of approximately $3 million. The Edmonds PFD also applied to the Snohomish County PFD for an allocation with a present value of $2.7 million. She noted the Snohomish County PFD has already made significant commitments to Lynnwood and Everett for their projects. Edmonds City Council Draft Minutes April 16,'2002 Page 13 To ensure conmiunity involvement, Ms. Conner explained State law required a 1/3 match of the sales and use tax rebates. Adding a sense of urgency was the fact that Snohomish County PFD has indicated an allocation to the Edmonds PFD would depend on submission of a match guarantee by April 19. She noted this date was related to deadlines imposed on the Snohomish County PFD by the Snohomish County Council. At this time, the only source of matching funds is the City of Edmonds. Therefore, the Edmonds PFD requests the Edmonds City Council make a $2 million match guarantee against the use tax rebate. She emphasized this was the best and perhaps only opportunity the Edmonds project would have to get funds from Snohomish County PFD. This match would enable the Event Center project to proceed as well as give substance to the passage of a recent amendment to the Comprehensive Plan that addresses the importance of developing the PSCC site. Ms. Conner explained this was a great investment opportunity for Edmonds due to the ability for the City to invest $1 and receive $3 already collected state tax dollars in.retum. She explained Edmonds, the community, and the region needed the Event Center. Never again would the City have the opportunity to preserve a historic site, restore a valuable performing arts venue and create a conference capability with so much outside assistance. If the City chose not to provide the requested match, $5.7+ million would be lost to other entities that recognized the value and would reap the benefit. In addition to the $2 million match, the Edmonds PFD Board requested the City guarantee the payment of bond debt service and any operating deficit. She explained the rebate of sales and use tax generated in Edmonds and Snohomish County should adequately cover the bond debt service. Under the use scenario presented to the Council, the financial picture for operating expenditures was much improved. The Edmonds PFD Board planned to solicit contributions, grants, and gifts in the form of a capital campaign to cover any operating deficit. She emphasized the PFD Board planned only to seek operating funds from the City Council as a last resort. Ms. Conner explained the Board was currently negotiating with the prospective purchaser of the PSCC a package that includes partial ownership of the property, improved parking, and some renovation. She noted the Board was not at liberty to discuss the specifics until the negotiations were concluded. Ms. Conner summarized this was a work in progress and she acknowledged there were challenges ahead. However, the Board was convinced that a team effort on behalf of the community would prevail. She concluded it would be a shame if Edmonds watched while neighboring cities such as Lynnwood and Everett took advantage of what was left on the table by Edmonds. Greg Easton, Property Counselors, explained the PFD Board requested he revise operating projections consistent with the evolving concept for the facility and that would concentrate investment on renovation of the auditorium, provide structured parking within the first phase of the project, and retain the existing classrooms and gymnasium as they are. He reviewed three operating scenarios and the financial picture associated with each. The first operating scenario would accommodate auditorium events only. Under this scenario, several adjustments were made to the operating projections, 1) eliminate all projected uses other than performing arts events, auditorium uses and special community events (specifically excluding conventions, conventions with exhibits, banquets and receptions), 2) reduced the staffing requirements due to less need for event staff, 3) adjust the food and beverage projections to reflect a commission paid by outside caterers, and 4) add parking fee revenue due to the development of parking in the first phase. He noted previous projections did not include any revenue from parking fees. He explained the revised operating projections now included sources of unearned revenue to fund the operating deficit including an Edmonds City Council Draft Minutes Apffl 16,2002 Page 14 admission tax, and in -kind contributions. He summarized in the auditorium only scenario, an operating deficit of $56,000 per year was anticipated which was less than projected in the January Business Plan. The i second scenario was use of the auditorium as well as other areas in the facility at a level less than previously projected but consistent with the usability of the gymnasium and upstairs classrooms in their current form. In addition to the auditorium use, this scenario would accommodate small meetings and conferences as well as banquets and receptions. With the additional rental revenues, parking revenues, additional foodibeverage commissions, and contributed income (admissions tax and in -kind contributions) the projected operating deficit was projected to be zero. The third scenario included auditorium events, use of the gymnasium and classrooms as well as use of the gymnasium on Monday — Thursday for athletic uses. He pointed out it was important to supplement funds available for facilities such as this with grants and contributions from the community. He noted this would be an important element of this project. Recognizing that the Council and community were relying on the information Mr. Easton provided, Councilmember Plunkett requested he describe his experience. Mr. Easton described his involvement in developing the original studies for the Maydenbauer Center, which has extensive convention facilities as well as a performing arts facility. He explained his continued involvement in the Maydenbauer Center including reviewing the financial performance of the facility, updating the financial status of the project, and working with the Financial Oversight Committee. He summarized this provided the opportunity to review his projections and relate them to the actual experience of the facility. Councilmember Plunkett inquired whether the projections were conservative. Mr. Easton answered. they were not conservative, but were attainable. Councilmember Dawson expressed concern with the slim packet of information provided to the Council that differs so radically from the January Business Plan. She inquired whether a revised Business Plan had been developed. Mr. Easton answered the PFD Board was in the process of revising the Business Plan and anticipated it would be complete by the end of the week for the presentation to Snohomish County PFD on Friday, April 19. Councilmember Dawson expressed concern that the PFD Board was requesting a guarantee from the City without presenting a revised Business Plan to support the operating projections. She asked if the proposal was to purchase and renovate only the auditorium and gymnasium. Mr. Easton answered the current proposal was to purchase the auditorium and gymnasium, renovate only the auditorium, and construct onsite parking. There are also funds projected to be spent on structural improvements of the facility but not on upgrading the interior finishes of the gymnasium or classrooms. Councilmernber Dawson asked the projected cost of purchasing the facility. Mr. Easton answered that was currently under negotiation. Ms. Conner noted the PFb Board's request for funding and guarantee could include contingencies. She explained a purchase price had not finalized. The PFD Board had $7.5 million to spend on acquisition, upgrade to the building, parking and any improvements to the auditorium and gymnasium would require capital fund raising, gifts, contributions, grants, etc. Councilmember Dawson asked who the potential developer was. Ms. Conner noted Mayor Haakenson referred to Covenant Construction Management but she was unable to quote a purchase price until the negotiations were finalized. Councilmember Dawson inquired about what else would be developed on the site. Ms. Conner referred to Mayor Haakenson's comments regarding parties' interest in increased height and density. She noted it would be development that would be compatible and not be a greater impact to the immediate area. Edmonds City Council Draft Minutes April 16, 2002 Page 15 Councilmember Dawson asked if the PFD Board's negotiations have included discussion about the Board lobbying the Council to increase heights or density restrictions. Ms. Conner answered they had not. Councilmember Dawson asked which of the three scenarios the PFD wanted the Council to support. Ms. Conner answered the best use of the facility was using the auditorium and using the gynmasium for events and athletics. Councilmember Dawson asked whether any feasibility study had been done regarding the athletic component. Mr. Easton answered the net revenues from athletics were projected at $17,000 based on information provided by the City's Parks and Recreation Department. This was also consistent with revenues collected by PSCC currently for the use of the north gymnasium. Councilmernber Dawson asked whether the projection for 316 events per year was realistic. Mr. Easton answered this was not an unreasonable estimate and it was consistent with the level of utilization for similar facilities. He noted on some days there would be more than one event. Councilmember Dawson asked whether it was consistent with the current level of utilization. Mr. Easton acknowledged it was more performing arts events and athletic use. Councilmernber Dawson referred to the projection for 105 performing arts events per year and asked how many performing arts events were held currently. Mr. Easton answered approximately 25 per year. Councilmember Dawson asked if there was a demand for 105 performing arts events per year. Mr. Easton answered the Market Demand and Feasibility Study addressed potential use by local groups (those currently using the facility), regional groups (Pacific Northwest Ballet, Seattle Opera, etc.), and touring groups. He summarized the usage was based on detailed discussions with those user groups. Councilmernber Dawson inquired about the projected rental fee for the facility. Mr. Easton stated it was anticipated to be $750 per performing arts event, which was slightly above the current fee. The PFD Board was sensitive to the need to provide a facility to performing arts groups at a fee they could afford. Councilmernber Dawson observed the projections include a number o f small meetings, receptions and banquets, noting these uses were not in previous proposals. Mr. Easton answered those uses had always been anticipated. to be included; the type of events that were no longer included were conventions and conventions with exhibits. COUNCILMEMBER PLUNKETT MOVED, SECONDED BY COUNCILMEMBER ORVIS, TO EXTEND THIS ITEM FOR ONE HOUR. MOTION CARRIED UNANIMOUSLY. Councilmernber Dawson recalled the previous plan was a more state-of-the-art convention center and meeting facility. She asked whether any feasibility study had been conducted on the demand for the "upstairs old classroom and gymnasium" versus the high profile convention center. Mr. Easton answered the type of events that would occur in those classrooms were small local events and meetings. He noted only conventions and conventions with exhibits required specialized space and, under the current proposal, that type of space would not be provided. Councilmember Dawson inquired about the demand for small meeting spaces for 25-30 people in the area or from outside the area. Mr. Easton answered they did not envision much demand from outside the community but within the community there was always a demand for small rooms at an affordable price. He noted as the price increased, the demand also dropped. The rental rates for those rooms would be consistent with other small meeting rooms within the community and it was his understanding such meeting rooms were scarce. Councilmember Dawson asked whether there was a difference in the capital cost for the auditorium only scenario and the auditorium/event/athletics scenario. Mr. Easton explained auditorium/event/athletics scenario merely added more events to the same facility. Ms. Conner noted the greater utilization under Edmonds City Council Draft Minutes April 16, 2002 Page 16 the auditorium/event/athletics sce ario was the gymnasium. She pointed ou there was no other facility �X' i in the area that could accommolate a sit-down banquet for 400 people. commented the intent was not to be in direct competition W1 enter ci ities in the City but to provide a venue for entities that currently must hold events outside the community. Councilmember Dawson observed there was no difference in the number of staff for the three scenarios although each reflected a different number of events. Mr. Easton explained the proposal was a rental facility so the responsibilities of staff would be to book the building and collect rents. He acknowledged this would be a lean staff that would be worked hard. Councilmember Dawson asked whether the feasibility study regarding use of the auditorium reflected limited staff and that users would provide their own crews. Mr. Easton explained in most instances, a facility was made available for rent, which included certain basic features but extra setup, microphones, etc. was provided at an additional charge. Councilmernber Dawson recalled the previous projections reflected far greater staff costs. Mr. Easton answered much of the staff costs were related to conventions and exhibits and the higher level of service associated with that type of event. Councilmember Dawson noted the proposal was to have 4x the number of events that were currently held in the auditorium. She asked if the groups he anticipated using the facility were interested in a barebones type operation. Mr. Easton noted in many instances, the users provide their own ticket takers, technical staff, etc.— that was standard in the business. Councilmember Dawson asked if the personnel costs included City staff time. Mr. Easton answered they did not, but other general administrative charges included insurance and professional services such as legal services, accounting, etc. that would be purchased from the City or other outside vendor. Councilmember Dawson noted the projected staff cost was $48,000; however, the PFD has already spent over $120,000 in City staff time this year. Mr. Clifton clarified, explaining the figure provided to the Council last week was total expenditures related to PFD activities, not what it cost the City. He recalled the City allocated $34,000 in 2001 to the PFD and the PFD was obligated to pay back 2/3 (or $21,000) of the amount collected in sales and use tax. Therefore the total was $53,000 — $16,000 in staff time (including benefits), $24,000 in legal fees, and the $13,000 from the original $34,000 allocation. Ms. Conner added the original $34,000 allocation was from hotel/motel tax funds:, not the General Fund. Councilmember Dawson pointed out utility costs were projected to be the same for all scenarios. She questioned how this would be possible when the auditorium only projected 196 events and the auditorium/events and auditorium/events/athletics projected 316 events. Mr. Easton advised the figure shown for utilities under the auditorium/events/athletic scenario would be adequate to support that activity and could be reduced for the auditorium only and auditorium/event scenario. Councilmember Dawson commented the Business Plan had not previously included parking and there was no information provided regarding the parking structure today. Ms. Conner explained the intent was to have 160 stalls underground and 60 stalls above ground, all contained on site. C6uncilmember Dawson asked about the cost to construct a parking structure. Ms. Conner said it had been estimated to be $2.7 million. Councilmernber Dawson observed that spending $2.7 million for the parking structure and $3.8 million for acquisition left only $1 million for renovation. Ms. Conner anticipated the $7.5 million would cover acquisition, a parking structure, and structural improvements such as ADA, seismic and asbestos removal Edmonds City Council Draft Minutes Apfil 16,2002 Page 17 and very little renovation. She reiterated a capital campaign would be conducted and grants were being applied for to fund upgrades of the facility. Councilmember Dawson referred to projected revenues of $150,000 from parking and asked the cost of parking. Mr. Easton explained the cost in today's dollars was estimated to be $4 per vehicle assuming three attendees per vehicle for ticketed events, banquets and receptions. Councilmember Dawson asked whether any other facility in the area charged for parking. Mr. Easton answered he was not aware of any other. Councilmember Dawson asked whether charging for parking would impact the demand for the facility. Mr. Easton explained the bulk of the parking revenue was from ticketed events in the auditorium. He noted users were accustomed to paying for parking at events and did not feel $4 was an aggressive figure. Councilmember Dawson asked the percentage of the admission tax. Mr. Easton answered it was a 5% tax on the gross value of the ticket, the rate authorized by the PFD legislation. Councilmember Dawson asked if that amount was included in previous projections. Mr. Easton advised it was. Councilmember Plunkett asked whether any changes in the projection would be necessary as a result of Councilmember Dawson's questions. Ms. Conner answered no. Councilmember Plunkett asked whether most of Councilmember Dawson's questions had been addressed in the projections. Ms. Conner answered yes. She explained the PFD began with a grandiose plan, scaled it back once, and now have scaled it down to reality given the amount of available funds. She reiterated Mr. Easton's indication that these numbers were attainable. Councilmernber Wilson asked how long the City would be responsible for guaranteeing the bond debt service. Ms. Conner answered 25 years. Councilmember Wilson asked how long the City would be obligated to provide any operating deficit. Ms. Conner explained the intent was to come to the City for funds for the operating deficit only as a last resort. She noted Kirkland raised $600,000 per year to offset their M&O deficit. She emphasized funds could be raised in the community to offset the operating deficit. Councilmember Wilson asked if any projections had been done to determine how long it would be until fund raising was in place to address any operating deficit. Ms. Conner explained the figures provided projected stabilization in 2006. She noted the project would be phased depending on the funds that could be raised. She anticipated the building would be operational in 2004. Councilmember Wilson asked whether the PFD would still have needed funds from the City if the PFD had sought a public vote to increase the sale tax. Ms. Conner explained that with the constraints imposed by the Snohomish County PFD, there was no other option than to come to the City. She explained the construction deadline was moved from January 1, 2003 to January 1, 2004; however, the Snohomish County PFD imposed a viability deadline of April 30, 2002. She noted the Edmonds PFD did not want to extend the viability deadline as it would open the door to another entity forming a PFD and possibly seeking the Snohomish County PFD allocation for the Museum of Flight. Councilmernber Wilson asked whether the projected revenues assumed a minimal amount of renovation. Ms. Conner stated the projected revenues were based on minimal renovations and as capital was raised for further renovations, the rental rates would be increased to reflect the improved facility. Councilmember Wilson asked if the number of events currently held at the PSCC was limited by accessibility to the auditorium due to existing agreements the PSCC has with other users. Mr. Easton answered 20 events per year reflected the performing arts use. There were also two church services held on the site every Sunday. Edmonds City Council Draft Minutes April 16, 2002 Page 18 Councilmember Petso referred to Mayor Haakenson's remark regarding height and density concessions and asked whether she should be inclined not to proceed with the project if she was unwilling to consider height and density concessions. Mayor Haakenson explained each of the potential bidders that he met with, who were interested in partnering on a joint project, were willing to work with a partner to create a performing arts/convention center but were also interested in increased height and density in order to develop their project on the property. He noted this would come to the Council regardless of whether there was a performing arts center on the property. Ms. Conner answered that fact should not kill this proj ect. Councilinember Petso asked how the City would keep the PFD or renters of the project under control after pledging the funds. For example if a renter caused a great deal of neighborhood disruption, what recourse would citizens have to control the use? Mr. Clifton explained under PFD legislation, the PFD had the ability to own, operate, maintain, etc. a regional center and was an antonymous body. Thus the City Council would have no control over the type of events that took place in the facility. It would be the PFD Board that authorized the uses that could occur in the facility. Mr. Snyder assumed if the Council chose to provide funds, the City could, via an interlocal agreement between agencies, impose conditions on the use of the funds. Councilmember Petso asked whether those conditions would need to be established tonight. Mr. Snyder pointed out this would require the creation of a fairly complex interlocal agreement. The Council could give staff direction regarding the type of conditions but the agreement would need to be drafted for review by the Council and PFD Board at a later date. In response to a question raised by Councilmember Petso regarding the request for the City to guarantee payment of bonds, Administrative Services Director Peggy Hetzler explained the $7.5 million was the maximum amount the PFD could issue bonds for based on three dedicated revenue streams: 1) Edmonds sales and use tax rebate, 2) the Snohomish County PFD funding, and 3) the City's match. Over a 25-year period, those revenue streams would generate $15 million. However, all that the PFD could access would be $7.5 million. The proposal was to issue $7.5 million in debt that would be repaid over a 25- year period. She explained Snohomish County volunteered to issue bonds on behalf of the PFD but requires the City guarantee debt service in the event one of the years in the 25-year- revenue stream did not generate sufficient revenue to pay that year's debt service. Ms. Hetzler explained the PFD asked that she identify possible funding sources the City could devote to accomplish this 1/3 match. She identified the first 1/4 Real Estate Excise Tax (REET) as the most appropriate funding source for the 1/3 match. She explained this revenue source was restricted by State law to capital projects identified in the City's Comprehensive Plan and the revenues were currently dedicated by the Council to park purchases. She noted the PSCC was included in the City's Comprehensive Plan. She referred to a 5-year forecast of REET funds, explaining that assuming a conservative 1% annual revenue growth factor, incorporating all capital projects currently identified in the Parks Capital Plan, and assuming certain grant proceeds would be associated with some projects due to the Parks Department's past success in obtaining JAC grants, this fund would have the capacity to absorb the $2 million match the PFD requested. Council President Earling asked Ms. Hetzler to describe the typical annual growth factor in the REET revenues. Ms. Hetzler explained her research of the past six years indicated total revenues have increased by over 95% and each year there were increases of 15%-18% consistently until 2000 when revenues declined by 15% that year. However, in 2001, revenues increased by 18%. Year-to-date collections are on track with the amounts collected in 2001 and 1999. She noted it was difficult to Edmonds City Council Draft Minutes April 16,2002 Page 19 project revenues in this fund because it was economically sensitive and particularly sensitive to interest rate fluctuations. Council President Earling noted the forecast indicated some benefit from providing $1 million in cash and $1 million in bonds. He asked Ms. Hetzler to describe the benefits of this scenario. Ms. Hetzler explained she also considered providing $2 million in cash or financing the full $2 million to identify a match each year between the incoming REET revenues and outgoing debt service payments. What appeared to provide the best match was a $1 million cash contribution and financing the remaining $1 million contribution over 25 years. She noted this would allow the fund to maintain a fairly significant cash balance at all times. Councilmember Dawson asked if Fund 126 could only be used for park purchases, how could it be used when the City would not be purchasing anything. Mr. Snyder explained that would be one of the purposes of the interlocal agreement, to provide an audit trail showing consideration that would meet the statutory requirements. He noted the City would end up with some property interest to support the use of the park funds. Councilmember Dawson commented the City could not provide the $2 million from Fund 126 absent some type of agreement or interest in the property. Mr. Snyder explained via an interlocal agreement the City could cooperate and give property to another district provided the use of the funds in the hands of the other public entity complied with the statute. He concluded the Council could provide a statement of intent tonight that would be subject to approval of an agreement at a later date Councilmember Dawson asked who would pay the $7.5 million in bonds. Ms. Hetzler answered it would be paid from the PFD's revenue streams. Ms. Hetzler explained the sales tax revenue streams were more than sufficient to pay the annual debt service. Councilmember Dawson asked why a guarantee was necessary. Ms. Hetzler explained sales tax revenue was also economically sensitive and over a 25-year period, the revenue streams were estimated to escalate by 3% per year although historically sales tax revenue has grown at a higher rate. However, due to recessions and other events, there may be a year When the revenue stream was not sufficient to cover the debt service. Councilmember Dawson asked the amount of the annual debt service on the bond. Ms. Hetzler explained it would be a structured debt service that required payment of interest only in the early years due to growth in the revenue stream over time. The debt service would initially be approximately $440,000 per year and increase to over $800,000 per year toward the end of the bond issue. Councilmember Petso asked why the Marina Beach debt service was still in the REET account, recalling there had been grants obtained to refund the bond. Ms. Hetzler advised the City did receive grant proceedings of $2,03 1,000; she discussed with Mayor Haakenson when the grant proceeds were received whether the bonds should be called or the cash left in the REET fund until other issues were explored such as the PFD's request. She explained that having the extra cash on hand made this work for the PFD. The City could choose to refund the $2 million in bonds but the fund would need to provide debt for the $2 million contribution to the PFD. Since the Marina Beach bonds were already issued and the debt issuance cost already paid, it would seem more economical to leave the grant proceeds in place rather than issuing more debt for $2 million and refunding $2 million in debt. Councilmember Petso asked whether the intent was to pay debt service on Marina Beach and borrow an additional $1 million. Ms. Hetzler agreed that was the plan. Councilinember Plunkett asked whether the REET funds could be used without impacting other projects including an opportunity that might arise such as creating parkland from the old Woodway Elementary Edmonds City Council Draft Minutes April 16, 2002 Page 20 School. Parks and Recreation Director Arvilla Ohlde explained in the scenario outlined where Fund 126 pays the debt on City Hall and the option of the debt service for Marina Beach, the fund could still support all the capital fund acquisitions identified in the Comprehensive Plan and did not jeopardize any of the planned expenditures. Public Comments Mayor Haakenson asked the audience members in support of the request to stand; a majority of the audience stood. He then asked audience members who were opposed to the request to stand; several audience members stood. Bill Trenkamp, 424 Daley Street, Edmonds, indicated he was opposed to the PFD request for $2 million for a number of reasons including: the State budget was $1.6 billion short; Snohomish County sales tax revenues have been declining; the City has sought ways to cut services due to declining funds; and the Pacific NW was leading the nation in unemployment and lagging in recovery. If $2 million was available, it'should be used for existing City needs and not a project that would indebt the public for another 25 years. He pointed out a study conducted in 1997 commissioned by a performing arts group determined that the auditoriurn even after renovation would be a poor facility for performing arts. He alleged the projected development costs were not based on complete information. The project was not financially feasible because there were no current seismic studies, no current traffic impact studies, no EIS, no architectural and design study, revenues were unstable and must come from gifts and grants, the cte c were based on inflated dollars in 1988 and 1996 studies rather than current costg.-cod-es y of the negatives��� ha g d over . ... . ...... ... . ..... I '!! C! 1, 11 1 Ul Ute ou �no e met by 19 a 6 studi S<, -affd— v Stu property cost had been determined. There also hMadnot een =nystu�dvof the neg�ative impact on the people living in the residential neighborhood surrounding the site. He described the significant impact of the 20+ performing arts events and Sunday church services had on the neighborhood. Gail Sarvis, 1101 12'h Avenue N, Edmonds, encouraged the Council to vote yes on the PFD's request to purchase and renovate the PSCC. She recalled comments from the community about the loss of historical places, noting this was an opportunity to preserve some of Edmonds history. She described the use. of the PSCC auditorium by students in the Jazz Connection (established by the Edmonds Daybreaker Rotary) for their performances. If the auditorium was not available for their performances, she explained this endeavor may not be possible. Jack Loos, 729 Main Street, Edmonds, remarked the Council was in a unique position as it had demonstrated an interest in this type of project by looking at community arts as a whole as well as including it in the Comprehensive Plan. The Council now had a proposal to make this a reality. He urged the Council to follow through with the concepts developed in the past. Darlene McLellan, 22615 92 "d Avenue W, Edmonds, indicated her strong belief in partnerships and stated this was the opportunity for the City to do a partnership. She noted the volunteer PFD Board had matured rapidly, identified available resources and developed a realistic option. Now was the time for the City to provide the necessary and available support to make the project happen. She pointed out Snohomish County had no obligation to support the project if the local community did not. She urged the Council to proceed with the conviction that this was a worthwhile effort that preserved a fine building for the future and allowing the arts community to remain intact and flourish. Council President Earling asked Ms. McLellan if she felt there was enough support in the community to raise $20,000 - $50,000 per year to cover the operating deficit if necessary. Ms. McLellan said there was interest from the Edmonds Arts Festival Foundation in seeing this type of thing happen. The Foundation Edmonds City Council Draft Minutes April 16, 2002 Page 21 chose not to maintain a building because museums without other draws categorically die in the debt of maintaining a building. Further, the community was interested in saving something from the past. She summarized yes, there was enough support in the community to raise funds to cover the operating deficit. Cami Smith, 9228 183 d Place SW, Edmonds, described her involvement in the arts including currently serving on the Washington State Arts Commission. When traveling throughout the state she was continually in awe of the support that even small towns provide for their cultural centers. She commented her 13-year old, when told the auditorium may be lost, said "that would be really dumb, then what would we do?" Michael Smith, 9228 183 rd Place SW, Edmonds, speaking as a citizen art advocate and President of the Fine Arts Center of Edmonds (FACE), on behalf of the FACE Board of Directors, urged the Council to stand up for the arts in the community and vote in favor of the PFD funding for performing arts. He asked what it would say about the community that prided itself as an arts community, if the auditorium were lost due to a lack of political support. He urged the Council not to use fiduciary responsibility as an excuse not to make the financial commitment that this community treasure deserved. The Council could address any fiduciary concerns by imposing appropriate conditions and oversight to ensure a viable management plan was developed. He urged the Council to demonstrate their commitment to the arts by supporting the PFD's request. He acknowledged four FACE board members in the audience. Edwina Baxter. 22124 98 Ih Avenue W, Edmonds, pointed out the citizens clearly supported this project' but had not been given the chance at philanthropy given the events surrounding the ultimate fate of the PSCC. She noted the historic museum united civic leaders and activists who rarely agreed. She explained this was an opportunity to save something unique as there was no other venue of this size in the area. She summarized there were many community and art organizations hoping the efforts to save the auditorium succeeded. Council President Earling asked Ms. Baxter whether there was sufficient support in the community to provide funds for the operating deficit if necessary. Ms. Baxter answered yes, and offered to assist with that effort. Roberta McBride, 8523 215 Ih Street SW, Edmonds, recalled last year the Council created the PFD to explore the possibility of creating a regional center in Edmonds. Over the past several months, she I !�'' attended most of tI anirwatcriedTTITey-wQrked to meet impossible deadlines. The 11 1 1 1 4 1! 1 1,111! 1, Board has worked 5 satisfy st t county and city requirements nd have modified their original plans - 4X - !LS ) considerably in an la��to make —the­projec� —more economically feasible. The PFD listened to neighborhood opponents and made every effort to accommodate their concerns. The PSCC was desperately needed by the community, and once renovated would be an enticing venue for other arts organizations to bring cultural enhancement to the City. Without the auditorium, performing arts organizations would be forced to find other communities in which to perform and Edmonds would lose much of what made it a desirable community. In response to the comment that even if renovated this would be a poor performing arts facility, she pointed out this was the only performing arts facility in South Snohomish County. The PFD deserved the support of the Council that created it and the community deserved this facility. She urged the Council to support the PFD's efforts. Norma Dermand, 16214 Meadow Road, Lynnwood, noted Edmonds has always stood out as the arts center of the area and arts have been an integral part of the character of Edmonds. She noted it would be unthinkable for the area not to have a performing arts venue and it would much more expensive to build a new facil ity rather than save the existing facility. Although some neighbors oppose the facility, many Edmonds City Council Draft Minutes April 16, 2002 Page 22 were thrilled to have it in their neighborhood and found it to be very convenient. The arts groups were beneficial to the city because they attracted people from outside the area to attend performances. With the loss of the auditorium, the symphony, if it survived, would be forced to leave Edmonds. She concluded the City had much to gain by saving the auditorium and much to lose by letting it go. She urged the Council to find a way to save the auditorium. Jeri Hamilton, 808 Driftwood Lane, Edmonds, urged the Council to seize this opportunity to support the request for matching funds to obtain the historic PSCC for the arts and the community. Mayor Haakenson congratulated Ms. Hamilton on being named "Citizen of the Year." Natalie Shippen, 1022 Euclid, Edmonds, pointed out the Council was being asked to provide $2 million, to guarantee payment of bonds and to fund any operating deficits that may occur. She questioned whether the Council had sufficient information to make such an open-ended financial commitment. She noted an arts district worked with the Edmonds Community College several years ago to build a new facility but encountered the same problems the PFD has encountered. Prior to seeking public finds, that arts district developed an operating agreement to clarify the responsibilities of the owner and operator, prepared documentation identifying personnel expenses, fee assumptions and budget, and itemized the performances that would use the auditorium each month. Although she supported acquiring the auditorium, she disagreed with the process that has been followed. She commented it had been shown the PFD was an awkward vehicle to accomplish that and preferred the Council purchase only the auditorium and gymnasium. Roger Hertrich, 1020 Puget Drive, Edmonds, explained his concerns with the impact of parking on the neighborhood had been addressed via the inclusion of parking in the original proposal. He agreed the PFD Board had done a remarkable job. He supported preserving the PSCC and urged the Council to consider the importance of the timing of this request. He pointed out if the $2 million was not invested, the City would lose $2.7 million. He commented the questions posed by Councilmember Dawson were good and her intent was to protect citizens but timing was of the essence; if the Council did not act now, the opportunity to preserve the PSCC would be lost. He urged the Council to envision the economic stimulus the facility could provide to the City. Rich Demeroutis, 921 Pine Street, Edmonds, expressed concern about the projected use of the gymnasium for receptions -and meetings and questioned whether people would want to hold a meeting or reception in a gymnasium. He expressed concern that not enough research had been done on the structural integrity of the gymnasium and auditorium. He recalled when underground parking was considered on the Public Safety campus, the water table was too high, a possibility that may exist at the PSCC. These unknown issues would increase the cost of renovation and construction of the parking facility. He was concerned with the City providing $2 million and being accountable for future costs. He noted the community was not known for large companies that donate to the arts such as may donate to the Kirkland Performing Arts Center. He suggested the PFD request more time from the Snohomish County PFD, particularly since the construction deadline has been moved to 2004. Peter Frame, Covenant Construction Management, Inc. advised they were the purchaser of the PSCC and the entity working with the PFD and a proponent who planned to construct senior housing on the north half of the site. He agreed the PSCC was a one -of -a -kind structure and the City should find a way to preserve it. He explained the south half of the building was structurally sound and could be renovated. The north portion of the PSCC was not structurally sound and should be demolished which they are proposing to do. The proposal was to build 100% affordable senior housing on the north portion of the Edmonds City Council Draft Minutes April 16, 2002 Page 23 site along with a parking structure under the north portion which would allow the event center to operate without impacting the neighborhood. Their experience with senior housing indicates there would be little need for cars and th t.the deve ­­1A Wdng requirement and demand. He commented independe senior aparttments h�ad a low impact on city services d the tenants gave more t vo e to the community than they required in services �suc as vo unteering at the event center. He pointed out the huge demand for this type of housing and was hopeful they could enter into an agreement with the PFD to complete the project. He agreed time was of the essence. Carol Nordling, 1020 Alder, Edmonds, was frustrated the project was taking on a regional aspea Although people often refer to Edmonds as a quaint town, this was incompatible with a regional center due to the accompanying noise and traffic. Her primary concern was the regional aspect of a convention center in a residential neighborhood. She was disappointed the arts community had been notified of tonight's meeting but the neighbors had not. Hearing no further comment, Mayor Haakenson closed the public comment portion of this item. Councilmernber Dawson clarified the parking would be provided under the senior housing portion and the PFD would pay for the parking structure. Mr. Frame explained they would provide the land and the PFD would pay $2.7 million for 160 underground spaces plus 60 above ground spaces for a total of 220 spaces. He explained their use would also have 80 underground spaces in the garage. Councilmernber Dawson asked what studies had been done to determine whether underground parking was feasible. Mr. Frame acknowledged no studies had been done yet. Councilmernber Dawson clarified Mr. Frame was in negotiations with PSCC to purchase the property for $6.5 million and they would sell the auditorium and gymnasium to the PFD for $3.8 million. Mr. Frame agreed. Councilmernber Dawson asked if the intent was to demolish the buildings if the PFD and/or the City did not purchase them. Mr. Frame answered no, they did not propose to tear the entire structure down. Their intent has been to work with the City on a public/private partnership and satisfy the needs of the arts groups in the community and sub -region. He pointed out this was a unique opportunity to provide senior affordable housing which was nearly impossible to provide in Edmonds. Councilmernber Dawson observed the property was zoned "Public" and Council approval would be required to change the zoning of at least a portion of the property. Mr. Frame answered other options are being discussed and they did not have a specific plan that required a rezone although that was a possibility. Councilmernber Dawson inquired what plans they had that would not require a rezone. Mr. Frame answered he was unable to accurately explain what bad recently been discussed with City staff and would prefer not to speculate further without giving the Community Development Director and City Attorney an opportunity to consider a proposal that has surfaced during the past few days. Councilmernber Dawson asked if partnering with the PFD made it easier to do the project without seeking a rezone. Mr. Frame answered the intent initially was to seek a rezone and there was a proposal submitted by PSCC to amend the Comprehensive Plan and seek a rezone to R-1.5 zoning. Councilmember Dawson inquired whether the alternate proposal was contingent upon their partnering with the PFD Board. Mr. Frame agreed, noting their preference was that the two projects occur together. Councilmember Dawson pointed out ther ion :int:he 7PFD �Iegislation 'that s R e PFD partnered with certain groups, they cou . "slide t7hings into existing zoning" without a rezon Mr. CsF Edmonds City Council Draft Minutes April 16, 2002 Page 24 Snyder said he was aware of the provision but did not know the details. Councilmember Dawson pointed out that may eliminate the Council's ability to vote on a rezone of the property. Mr. Snyder pointed out the Council could impose conditions on their participation in the project including ceding back to the Council the authority that this provision took away. Council President Earling noted a purchase price had been tentatively agreed on with the PSCC and an offer made to the PFD of $3.8 million but an agreement had not been reached on the $3.8 million. Mr. Frame agreed. Councilmernber Wilson i nquired about the due diligence time frame for the property. Mr. Frame explained they have conducted investigation but not extensive soils tests. He noted they have some experience with building subterranean garages in Edmonds and have successfully built a subterranean garage at 4`h and Walnut and did not encounter any unusual problems. Councilmember Wilson asked when their due diligence would be complete. Mr. Frame answered as soon as possible and a time line had been established in the contract that they were required to meet. He would like to have due diligence compete by mid -May. Councilmernber Wilson asked whether go/no go points had been identified in the due diligence and asked Mr. Frame to describe those points. Mr. Fraime commented most of that would be political. Based on their inspection, they did not anticipate any subterranean problems but a quick soils test would confirm that. Councilmember Wilson recalled the PFD planned to begin operation in 2004 and questioned how Mr. Frame envisioned the process proceeding so that the senior housing was operational at the same time. Mr. Frame said if the PFD plans to be open in 2004, they would plan to be open at the same time. He asked that the community and Council work actively in support of this or inform them that they were not supportive. In response to Councilmember Dawson's inquires regarding land use decisions, Mr. Clifton emphasized there had been no negotiations between the PFD,Board and Covenant Construction with regard to any land use decisions. Land use decisions sought by Covenant Construction would be the sole responsibility of Covenant Construction and not the PFD Board. Councilmember Wilson questioned if theISM as identified as a historic structure, was there an ability iA��Some requiremenVts Mr. Snyder answered historic preservation was aimed at —tax breai�; r _ s r --f+uM g co e requiremenIL-12ai icu than waiver o ing co e r Tqu t rti larly places of public assembly, ..1111 Ter—ex-pTained Tn�ffy �be opportun�io �daint�ain the faqaa�'� �'�e �eMo windows and openings and exterior surfaces required undex Code., He commented the intent was to maintain the look f or sl F and feel of a historic buildinkbfut fnoi imm!!pact the �safety or structural in egri�> Councilmernber Wilson pointed out the action the Council was being asked to take was only providing funds to allow the PFD to procced-and-did not absolve the daevelopDer from proceeding with the required, rro g ot cl ppr ov review and analysis. Further �the Council providing fundin did n ob �i to �a e lany �e' d 'no e t y cou s gnifican ar an e a ns e e nd n a he acts were so i 1 it ' c s' mo 1 'c t10 ' c I or ' I s suc s t t imp OT 0 Zn tm PI - d he sa sa the e da an ga e ny er a eed- He e ame �1 t r. x w is propo 1rs y unce am what level of co i entthe Council was being asked to provide . He pointed out the best the Council could do tonight would be to state an intention to go forward perhaps in a three step process: 1) a general commitment that would meet the Snohomish County PFD requirement; 2) an agreement to agree Edmonds City Council Draft Minutes April 16, 2002 Page 25 that would identify deal points between the City and PFD; and 3) develop a more extensive interlocal agreement and possibly a three party agreement. He summarized a very complex transaction would be required to satisfy the audit trail and satisfy legal and bonding requirements. He asked staff what was the minimum necessary to go forward, noting the Council could not make a $2 million appropriation tonight as public notification was required to amend the budget. Mr. Clifton answered a number of questions were posed to Snohomish County staff regarding what guarantees they want the PFD or the City to provide, but Snohomish County did not provide answers regarding what specific guarantees they are seeking other than they want to see a viable project and that the City supported the project. COUNCIL PRESIDENT EARLING MOVED, SECONDED BY COUNCILMEMBER PLUNKETT, THAT THE COUNCIL AUTHORIZE THE MAYOR AND COUNCIL PRESIDENT TO SIGN A LETTER OF INTENT FOR $2 MILLION CONDITIONED ON: 1) SNOHOMISH COUNTY PFD COMMITTING SALES AND USE TAX TO THE PROJECT. 2) A SUCCESSFUL NEGOTIATED AGREEMENT WITH COVENANT CONSTRUCTION MANAGEMENT, INC. 3) A SATISFACTORY INTERLOCAL AGREEMENT WITH THE EDMONDS PFD. 4) COMPLETION OF A VIABLE BUSINESS PLAN FROM THE PFD. Council President Earling commented the Council most often considered infrastructure and public safety issues which were the guts of the community but to him, the arts community was the soul of the fainan Te4ich �ihe a�rtsas �elCas� coffn—uni u ackgroun wit t e Ms, finding a�,a lFe-7-is-t-or—ic-57 value of the building became very important to him. He recalled in 1984 the City applied for the Main Street Project and was not selected, in part because the city did not have many buildings of a historic nature. He pointed out this was an opportunity for the Council to move. forward but with a number of conditions. PT nT thf-, nlihlin n rTWP-C-0— the General Fund; he clarified the funds would come from Fund 126 and possibly fro�dbondj4. — Councilmernber Plunkeft thafiked the PFD board members and art organizations for bringing the project to th is point. He recalled ten years ago, this was a dream, a dream that was incorporated into the Comprehensive Plan. He referred to the suggestion that the $2 million should be spent on existing City needs, pointing out this was an existing city need that was identified in the Comprehensive Plan. Although he did not want to discount the hard numbers, he pointed out a lot of building and worthwhile projects were built on faith and hope and that was how the Edmonds Event Center would be built because the community believed in it. For that reason, he would support the proposed motion. Councilinember Petso said although she did not originally support forming the PFD because the project at that time appeared to be "completely and utterly hopeless," she was impressed with how the PFD changed the project based on new opportunities that arose and have presented a proposal she was somewhat interested in. She agreed with the speaker who criticized the Council's procedures for not advertising this as an item on which public comment would be accepted. She urged the Council to stop doing that, particularly when it was apparent some knew the Council would accept public comment but others may not have known. Councilmernber Petso did not favor the Council proceeding with any further action tonight other than what Snohomish County Council required. Her impression was that Snohomish County wanted to know where the 1/3 would come from and she was willing to commit to an intent to provide those funds but Edmonds City Council Draft Minutes April 16, 2002 Page 26 questioned whether that was sufficient for Snohomish County. Regarding the City guaranteeing the bonds, she was willing to commit to that with the assumption that the City could limit its total financial exposure. She was agreeable if the risk under the proposed motion was $2 million; however if the risk were $2 million plus the $7.5 million, she would require more details. She questioned whether Mr. Snyder could draft a letter of intent that provided an out for the Council. Mr. Snyder asked Council President Earling for clarification regarding his motion, whether the reference of Covenant Construction would also include another viable private partners. Council President Earling agreed that was his intent. Mr. Snyder asked whether the intent of the motion was that any further approvals would be contingent on necessary opinions of bond counsel and other approvals that may be necessary. Council President Earling and Councilmember Plunkett accepted this as a friendly amendment to the motion. Mr. Snyder pointed out that although the Council had stated its intent, it reserved absolute legislative discretion regarding the approval of each of the four phases in open session following a public hearing. Council President Earling agreed that was his intent. Councilinember Orvis indicated he would vote in favor of the motion. He recalled when he interviewed the PFD Board candidates, he asked about community support for the project. He pointed out the PFD selected a site that did not block views, chose to preserve a historic building rather than build a new building, did not ask for a sales tax increase that would have raised the sales tax to the highest in the state and instead pursued an alternate route that did not require any increased taxes. He thanked the PFD Board, the Council, and members of the community for their efforts. Councilmember Dawson commented there was a great deal of support for preserving the PSCC. Her initial inclination tonight was that it was not fair to make a decision of this Mmggnitude without th " iven Mr. Snyde_Fs­�explanation o_f__w_h_a_tt_h_eU_ouncil was of the community, without a public hearing. (V actually voting on, tE-e-C-o-u-n-c--ir-w-a-s--on-ly—a6eeing to talk further. She stressed the need for a public hearing on this issue to gather more information from the community. She indicated she would support the proposed motion to keep the process moving forward. She commended the PFD Board for everything they had been able to accomplish in a short timefra Councilmember Wilson indicated he would support the motion as crafted and as clarified by Mr. Snyder because it provided go and no-go points when the Council could make a decision whether to proceed or withdraw and it provided a great opportunity for the community to get involved. He commented that not pursing the opportunity to save the PSCC would be a disservice to the community in view of the outpouring of support for preserving it. Council President Earling stated that although he included four conditions in the motion, it was the intent of the Council to move forward and this should be clearly conveyed to the Snohomish County PFD. He clarified the action being taken tonight would direct the Mayor, staff and him to craft a letter outlining the intent to more forward and the conditions. With regard to his questions to Ms. McLellan and Ms. Baxter regarding support in the community, he explained if there was a need to raise funds to cover the operating deficit, the arts community should be interested enough to solve that problem should it arise. MOTION CARRIED UNANIMOUSLY. 9. REPORT ON CITY COUNCIL COMMITTEE MEETINGS OF APRIL 9,2002 Due to the late hour, this item was postponed. Edmonds City Council Draft Minutes Apffl 16, 2002 Page 27