Loading...
410 4TH AVE N.PDF - LEGACYlill 11111111 5035 410 4TH AVE N N_+ . The Herald/DREW PERINE A cross section of a piece of the SmartCelis basketball floor shows the integrated air cells (black columns), which are made in part from granulated shods and tires. FLOOR, -Of THE_ FUTURE The Herald/MICHAEL OILEARY Jalen Rose of the Indiana Pacers sits on the basketball floor at Puget Sound Christian College and fills out an evaluation form after the NBA team held a practice at the Edmonds school. Puget Sound Christian College in Edmonds has captured the interest of the NBA, where *teams come to practice andfield test the SmartCells floor, a synthetic basketball surface By RICH MYHRE 7 Herald Wrfter EDMONDS — Professional basketball players are not an easy bunch to impress. After all, �,hey usually raise the eyebrows of others. ey soar and they slam, and the fans who pay big d ll�A to watch such heroics are left to gasp with wonder and delight. It t�kes a pretty good show to dazzle an NBA athlete, but Tom Vaux of Kirkland has managed the tri'ck. All for the price of a beer bottle. Have you ever seen children at a school car- nival, grinning as a magician makes a quarter appear from behind some kid's ear? Those are the same wide-eyed expressions Vaux gets when he introduces NBA players to his new synthetic bas- ketball surface, the SmartCells floor, that is the creation of Seamless Attenuating Technologies, Inc., or SATECH, of which Vaux is the president. If the promise of fewer injuries and a poten- tially longer playing career doesn't nab the atten- tion of the athletes, the beer bottle does. The SmartCells floor, which by appearance is a dead ringer for a shiny hardwood basketball court, is a slightly cushioned surface that is comprised of, among other ingredients, ground up sports shoes and automobile tires. It is intended to lessen the shock to an athlete's body from running, leaping and landing, and the occasional tumble. . To demonstrate the softening quality of the floor, Vaux offers guests a brief performance. He heaves an ordinary beer bottle well into the air and lets it fall. The bottle would easily shatter on a hardwood floor. On the SmartCells floor the bottle lands intact, fit for use in future demonstrations. Vaux has been conducting these presentations — or what he calls, in the language of the laboratory, a specialty underlayment hardness resilience equa- tion test — at Puget Sound Christian College, where the first SmartCells floor was installed last year. It is an odd pairing, this state-of-the-art floor in this dark and antiquated gymnasium, the home of Edmonds High School in the 1940s and'50s. If See FLOOR, Page I OC A floor made from tennis 'Shoes? By, RICH MYHRE Herald Wr�er What is the SmartCell� floor? The top layer is composed of several. layers of urethane 'Compounds, which is like a liquid rubber and will stretch.- i Beneath the upper layer is the rubber pad with integrated air cells that look like black columns. It is the pad that is made about 40 percent from granulated shoes and tires, with the -remaining 60 percent from natural rubber' oils and other com- ponents. This is the layer that gives the court its cushioned feel. The white specks in the black layer are the ground up 1� pieces of shoes. SATECH uses all of the shoes, removing only the metal eyelits around the 'holes for the laces. sphalt. concrete or The bottom of the floor is bonded to a wood. When the floor is inp1ace, it can be painted to give it the, ap, I pearance of a hardwoo floor, comDlete with the wood grain and seams. The appearance is so realistic it is difficult t6 distinguish from a hiWdwo6d fi6or,even by kneeling -for a closer look. A SmartCells floor probably costs about four times as much as a wood floor, accordingto SATECH preg ' Wht'Torn Vaux, but the lifespan is probably twice that of a wood floor and with less maintenance. 16C Su* hday, JanuAry 19,1997 The HerAd FLOOR from Page I C Hollywood ever wants a remake of "Hoosier" or any other film about high school basketball of'a generation ago, this would be the place. An agreement was reached in 1995 between the college, which offers a - curriculum of biblical studies to a student body of almost 400, and SATECH. The students would help collect used athletic shoes —' almost 15,000 shoes were used — and the col- legemould give up its gym for one season. In return, the college would keep'the new floor. Part of the deal, too, was that the court would be available for inspection by prospective cus- tomers. Now, NBA teams in town to play the Seattle SuperSonics have been busing out to Edmonds on off days to experience the SmartCells floor. Lenny Wilkens coached the Sonics to their only NBA champi- onship in 1979 and today is coach of.the Atlanta Hawks. He brought his team to Edmonds in November to work out on the court. The Miami Heat visited thel gym earlier this month. A week later, the Indiana Pacers held a -practice there. , The sessions begin with the presentation from Vaux. He starts with a standing knee drop. That is, from a standing position he drops with his full weight to his knees. Try that on a regular floor, basket- ball or other, and you may need a sin-geon. Vaux: hops back up, unhurt. Then Vaux uncorks a toss with the beer bottle. The players watch the bottle. He watches them. "Their eyes are bugging out," Vaux said. "When you throw the beer bottle. all the way to the rafters and it doesn't break, that gets their attention." Soon the players are on* the court, giving the floor their own systematic examination. They dribble, seeing if the ball bounces back in the correct way while lis- tening for the proper sound. As they dribble, they look for dead spots and other imperfections. Then they shoot jump shots, eval- uating the floor for its spring. The real test, of course, is an energetic game or practice. Troy McNichols, coach of the Puget Sound Christian College team, says most players are dubious when they first walk onto the court. "There is this idea that, "Oh, this isn't wood.' But after about five minutes of playing on it, you don't even notice the difference," McNichols said. 'We like it and we've enjoyed playing on it. And teams that have come in and played us seem to like it as well." Wilkens is on SATECH's bas- ketball advisory board, as is former Sonic Jack Sikma. Both Wilkens and Sikma told Vaux that for a synthetic floor to be suc- cessful, it had to resemble genuine hardwood in every detail. "The perception of the floor is part of the game,". Sikma said. "The look of the floor, the sound of the ball bouncing, the squeak of the shoes. You're trying to, help people get over the hurdle of, 'Hey, this is different than I am used to.' I "You may be a little cautious at first, but then your body under- stands that it's OK," said Sikma, who has played 3-on-3 on the floor. "Once you get over that and get into the heat of the game, you don't think about it anymore." Vaux is frequently asked if the SmartCells floor is similar to the Tartan synthetic floors that were introduced in the late 1960s and early '70s. That was one of the first questions from NBA Vice - President of Operations Rod Thom, who came to Edmonds to inspect the court. Wilkens, who remembers the hard and rubbery Tartan floors with distaste, won- dered the same thing. "I knew if (SmartCells) was anything like Tartan, they could forget it," he said. "They would not even get a sniff from players. But this is not at all like Tartan. What I like about (SmartCells) is that first of all, you still have a wood feeling. The ball comes up, it bounces true, you can hear it. It has all. those things." Perhaps the major selling point for a SmartCells floor, and cer- tainly the reason that NBA teams are studying the product closely, is that it purportedly will reduce injuries, both periodic and chronic. As a result, playing careers should be extended and this would be a huge benefit to professional teams that have invested millions of dollars in their athletes. Some of this is educated con- jecture, of course. There is no data of athletes playing full NBA careers on SmartCells courts to compare with those who have played on hardwood. Sikma, who 'retired after 14 NBA seasons in part due to back pain; says he cannot be certain he would have played longet had his career been spent on a SmartCells floor. "I can't make that leap (of rea- soning) in the sense that no-one can," Sikma said. Sikma, though, believes the theory that a cushioned floor will -be less abusive to an' athlete's body. "If you're on a basketball floor 240 straight days (for prac- tices and games in an NBA s6�son), doing the same thing every day, yes, that's the premise here. And there is some scientific analysis backing it up." That testing was done by the University of Michigan, the Detroit Testing Lab, and researchers from the athletic footwear industry, and it com- pared the SmartCells floor to a hardwood floor. There were tests for impact, fatigue, running speed and friction testing. The data indicated that there was no difference *in running speed and that athletes showed only a very slight improvement in jumping on a SmartCells floor. The significant difference was in impact. In those tests, Vaux, said, "there was no comparison." After each NBA workout, Vaux collects questionnaires from the players. The results, he said, are conclusive. Athletes who train on a SmartCells.' floor "feel less fatigued and less sore afterward, and thenext day they will feel sig- nifitantly less fatigued and sore," Vaux said. And that's just the absorption from regular running and jumping. How. about the basket- ball player that is upended, and lands with full force on, say, his knee? ,!If you fall and land on your knee, (the SmartCells floor) absorbs it," Wilkens said. "For athletes, that's a great character- istic. I "Players today are so athletic," added Wilkens. "They are jumping, dunking, coming down, and certainly that jolts your body. Guys have back problems. They have problems with ankles and knees, and through all the r�search that Tom has done, it does show that there is less wear and tear on the knees and ankles." Because Wilkens is a believer, Atlanta may be SATECH's first NBA customer. The Hawks ate preparing to build a new practice facility - and Wilkens has already spoken to team president Stan Kasten. "Hopefully we will have one of those floors," Wilkens said. Vaux predicts that other NBA teams will begin lining up to buy SmartCells floors — which sell today for $40 a square foot, of about $200,000 for a full court — for their practice facilities. In time, he said, some NBA game courts may also have SmartCells floors. Then there will be colleges that are interested and maybe high schools, and there would certainly be a lucrative overseas market, too. ,'We're always looking for ways to improve the game," Wilkens said. "If there is anything that will help cut down on injuries -and stuff like that, we have to be inter- ested." ADDRESS: TAX ACCOUNTIPARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DETERMINATION: El Conditional Waiver E] Study Required 00-aiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: c PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: — PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: -21,-&IZ21�� SEWER LID FEE $: SHORT PLAT FILE: LOT: - SIDE SEWER AS BUILT DATED: 490 SIDE SEWER PERMIT(S) #: SOILS REPORT DATED: &-46- Z2;Z STREET USE / ENCROACHMEZT PLIT #: WATPR MPTFR TAP CARD T)ATFn- LID BLOCK: LATEMP\DSTs\Fomis\Street File Checklist.doc U� lqw r ----- �,Dy E r 1 � NO ED v Di EN IN 0 38LF-6'SS 01.45% 7- te: 67 S- I I- k 6� it -p �u- ISLRE 42 72.71 v FINISH FLOOR C STA 2�7901�'F 6" CLEA iPA k�'TL' A T 0 E-r E6: E=63 51 % V., STA 3+08.75 MULTI STORY 6' CLEANOUT— MASONRY EIUILDIN13 OR' N TE=68.0 (�E �620 C 1 52,156 SCLFT. IE=64 14 X STA 2+20�08 ANOUT 6" CLE TE=67.0 J4 At IE=62.36 TON S-R JD NOTE: ... TH UPL ALL CLEANOUT COVER TO MATCH FINISH GRADE. w, Sloi, TA 1+26 36 — 1 `40) 6" CLEANOUT TE=67.0± IE-60.49 & VERIFY PRIOR TO ANY Z., PICKUP EASTING LINE CONSTRUCTION. INFORM RIM 64 79 OUT OF THE BUILDING ENGINEER IF 2% MIN. GRADE �8 8(6*CLAf, crR -.All -S) LOCATION 10 BE CANNOT BE MAINTAINED. E 9 3(6-CP NW) VERIFIED. AlDilD DE - - - - - - - - - - - - - 4 0 2.0% MIN. -PL" LIN 9:5 L) -T if C IF CRASS -,z -rO LFVg�L C! Ij N, -a, Co BO �QT C65 W A A10 L I/-FjNIWFLOOR/ 2 -j . /ct, P, M 6�6 E 1" IE 1�7 8(4-LP'N., 6 A04UA Pe a; MULTI STOR�/.. I�ASONARYEIUILDING/ . , / t 4496 S�6 FT' MRiS 12/IZZ06 'DA E 10 *DEC Is 4 '051W T ./H I&IV L_- A V32:64� 62 -T- 7f TE-67 5 S89-46-05'�,- 6 .7JE=58.61/ e EXII - Wl'N uu - - - - - - - - - - - - - - -10"SS 0 0 EN MH'S E 111 10 SS PALE STRE =�3.03T�L SLOP IE=57. X==== I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...... ........... .......................... 0 2003019.0 %�-A--Ll 1 "= 40' A 7r7=- p0l, "STOP- wp c \-/—'O BENCHMARK "B" CHECKED BDC Cl ELEVATION 69.59' SSNIH SDM. cl 'A" R!M 66.09 Cp RIM 65.14 RIM 64.95 RIM 65.60 RIM 69.0fi DATE 01/06/06 �E 95 2(lacp E) -E 6� 7 �?:CMP E) IE 04.0(6'IP W) IE 64�7(6-[P W) IE 611(112-CMP 01) E 551(17- N) IE 6 �4 0 CP N) jE 64 0( 2-CP E) BUSH, ROED & HITCHINGS JCM opy SEWER LINE REVISIO CIVIL ENGINEERS & LAND SURVEY�R 2009 MINOR A VE. EAST, SEATTLE, WA 98102 (206) 323- 414 4 FAX (206) 323-7135 EDMONDS CENTTR L QF TH� ARTS < EDMONDS WASHINGI?L_j 1-800-935-0508 E-MAIL: INFD@BRHINC.COM #-; PAGE Ld -i APPROVED AS NOTED BY ENG NEERINQ, 80 80 V) NOTE: ALL CLE4NOLIT TO', HAVE NEW BUILDING ADDITION CAST IRON RING & COVER1 N _FW WAL 70 '--'��I_NEW WXLK 70 0 0\ E�IST. - - - - - - -- - - - - 18" �PIROPOS�El FIRE LINE 60 EXIST. WATER F RE LINE 1 -60 27.56ItF- 6" 7�T 6'' 93.72LF- 6" 93.72LF- 6" 59.08LF- I -q- /is PvG-a 4C) - r�o 10 5S IE=57.7i: 0 INSE�TA TEE ro z < U-) 50 ONNEcim + A-,L 1 fr-c6--- m 0-% r'i 00 cq + Ljj n 10 1`- 60 p- -2-0%-- r) 04 Z< 0) + -uj-r�: -9— oo C-4 0 P:D r, ZD 60 —P- 0, r6 , C-4 Z c (D 0 z + + < . Ln < -- uj Ltm.�- -4 --j 50 IE=57 96 -1 u Ln < Ln (o F.- < v)I . rlt I. -1 u (D < LJ �o ?00- C4 _j c\j r.,;- -1 u �o �o U-� , u (D < < II T < I Lj w LL, (n 'D i-- Y) co I- U) lo F- -4 (D L I I i LLJ D, MY ELEV 4500 c6l 0+00 0+50 1+00 1+50 2+00 2+50 3+00 N JOB NO 200301�.00 PROFILE: 1"=10' SCALE AS NOTED VERT. DRAWN WPG k' CHECKED BDC 1"=40' HOR. DATE 01/06/06 '04/ 2 BUSH, ROED & HITCHINGS, INC.' REVISED SEWER PROFILE CIVIL ENGINEERS & LAND SURVEYORS 2009 MINOR AVE. EAST, SEATTLE, WA 98102 (0 (206) 323-4144 FAX (206) 323-7135 EDMONDS CENTER OF THE ARTS LEWKS 121171 oco 7 m�j 1-800-935-0508 E-MAIL: INFO@BRHINC.COM EDMONDS WASHINGTON PAGE 2 El W U:\lddX2003019\dwgXxe-GRD.dwg, 01/06/2006 01:23:34 PM The City of Edmon& "PL( MON for SEDE SEWER PERMIT OUTSIDE [I INSIDE [3 REPAIRS 0 ..WAM # I - f2 OWNER ..... .... ....... .......... ............... Ci HOUSE No . .................................................. -" 6i-rl S, ................................................................. A N 7 lq" 4ram -to 5*4� It" .,ft 'aph... I I CARD No. ---� ....... EASEMENT No . .................. Aujuvlw ........... .............. q. Q-T .... (AZV-4 . . . .. ............... ....... PERMIT No . ......... T JE LOT No . ............................................ BLOCK No .............. .......... . ..................... ................ .......... ADD............... .......... /lid k A 0/e, Date Approved: BACKFILL WORK ORDER ISSUED .......................................... - DEPOSIT, $ ............... ................ ..... ................ SEWER WORK ORDER ISSUED ......... ..... ........................ ....... DATE .... .............................. .......... ....... BY ............ City 01 Edmonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771'.0221 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are, or may be, present on -the subject property. The information needed to complete the Checklist . should be easily available from observations- of the site or data available at City Hall (Critical areas inventories, maps, or. soil surveys). Date Received: I -11P City Receipt#: I Critical Areas File M -2:CC34- Critical Areas Checklist Fee: $1,36.00 Date Mailed'to Amalicant- 1 7Z 1 /A a A property owner, or his/her authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination* of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along. with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its; heirs, and assigns, in consideration on the processing of the application agrees ,to release, inderrinify, defend and hold the City of Ednionds; harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information fumished by the applicant, his/her/its agents or employees. By my signature, I cer* that the information and exhibits herewith subiriitted. are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. SIGNATURE OF APPLICANTIAGENT DATE 14/�V v3 Property Owner's Authorization By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspectiorf and posting .4ttendant to this application. SIGNATURE OF OWNER DATE 0 PLEASE PRINT CLEARLY Owner/Applicant: Applicant Representative: '214MONDS MAC MamfS Pismicr LIANI AI.CWTE-CLY , ditEMiLa-, MIE& Name Name M. i 6n+. Ave - Nip Stmet Address E5P M 040S wA 19OZO city State zip Telephone: 4u5 - 77 6 - Z -7 2+ Email address (optional): CA"R Cj,PdYnprJS. Wa I US AQI MCbb1J) ANIL - Street Address ahiTl.t VyA city State zip Telephone: St to Q Email Address (optional): _J`rA%JerS Ql) 1MV1 a Y-0h;ft-A Cpv Critical Areas Checklist.doc/4.22.2003 CA File No: OL4 A Critical Areas Checklist Site Information (soils/ topography/ hydrology/vegetation) 1. Site Address/Location: 2. 3. 4.. Property Tax Account N Approximate Site Size (acres or square feet): ----2 Aefrf 4- SAL it-0 0-z�-L M Is this site currentlydeveloped? _ yes; V no. If yes; how is site developed? Oa CiMON19Y jt(6ftrqMX ffV)jPlj465 0 IdU, 5. Describe the general site topography. Check all that apply. Flat less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: 0 Approx. Depth: 7. Site contai ns areas of seasonal standing water: 1�6 Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain of a water course'. NV Af 0 9. Site contains a creek or an area where water flows acrossthe grounds surface? J�fio-�4 are year-round? Flows are seasonal? - (What time of year? 10. Site is primarily: forested meadow ;.shrubs mixed urban landscaped (lawn, shrubs etc) 11.. Obvious wetland is present on site: 0 City Staff Use Only 1. Plan Check Number, if applicable? 2. Site is Zoned? 3. SCS mapped soil type(s)? . . Lo ja ^ I ,;,4 . C) 4. Critical Areas inventory or C.A. map indicates Critical Area on site? 5. Site within designated earth subsidence landslide hazard area? DETERMINATION STUDY REQUIRED WAIVER --T Da f I" 04_ Review eid br. e ��, - Critical Areas Checklist.doc/4.22.2003 Gt,&o OF 4, 01,17 OX 4. C-/ zl_ 6r, co, /- 0 /'/P4.,r7 r z2,,/17 7,- 4 -A / ' OF s 7- P- ec- T- CA r 24—W.- 12 12 06 �FOR I N 'PPRUVP AS NOTED C� BY ENGINEERiNG r Date: Ir Al 4. v 'life j 44 j-, or- U3 77�0 R,j . L/,o -/I Ile "&C-c AA *lr- cl r- 41 -r-,oVA L Z 4, Permit N City of Edmonds o: RIGHT-OF-WAY CONSTRUCTIONTERMIT Issue Date: //7 A. Address or Vicinity of Construction: 410 4"rk AvF_ NJ N C A R. . E A S-r 5 10 E oF PRoP. V_- B. Type of Work (be specific): Sr_-r- -rrmPORARY' 4-5' POLC AAlb 144 A(G PM-Tf -r IZN s*J S rd R myE 9 RA WK FOR C_ONX-rAuc"r�ow- /?44 V ISAA/K A- #4 N P0 L X A F'T� f R r- � 4S'7-R 0 Al 0 A4 P4 e"71"e 60L 9- 1W'I LL 9V 'SEr C. Contractor: hjin , CO. PUb _L-4-0Tn­fac1-_ 130 K4. K A. UE Y." Mailing Address: 2 (0 1 A F6 G 14 WA Phone: 4­: C \^JA I State License #: t-A - -t City Business License #: D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. 1% Commercial 1" City Project EUC (PUD, VERIZON, PSE, COMCAST, OVWSD) Subdivis'on F1 Multi -Family E] Single.Tarr�ly F-1 Other INSPECTOR: F. PAVEMENT CUT: F1 YES NO G. SIZE OF CUT x CONCRETE CUT: El YES NO Call for Pickup G. Mail Approved Permit F APPLICANT TO READ AND SIGN INDEMNITY. Applicant understands by his/her signature to this application helshe holds the City of Ed�onds harmless from injuries, damages or�xlaims of any kind or description �hatsd�.ver,.Joreseen or unforeseen, that may be maddagainst the City of - Edmonds or any of i'ts departments or empl�Y,9411,'Jnclu ding but hot,l . im ited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting thisp'ermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY, FORCE�,,A T. WHICH TIMEA DEBITOR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THEAPPLICANT. * Traffic control and -public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required'training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. * Three sets of construction drawings of proposed work are required with the permit application CALL DIAL -A -DIG (1-800-424-5555)fMOR TOPEGINNING WORK I HA VE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS Signature: 13011 Date: (Contractor or Agent) I - I-C J'.; ht A'pproved: b y g 0. --.Di "ti F Time Authorized: V`o­i d- After �s'rup' on-,,., gk/Fd#d%111;, Special Conditions 'ea w'7n Jjkr' M��Ilgs#qtlon, Fee:045 *45v-')�M Ja --nAt'll 11- J n A Ire. N - Alce--t- A i= Z.4 e Ac 6 i2xc_ I REQUIRED INSPECTIONS: tR_At=JC'1r C j::2,-q 7'W--,Z- Em A QCVV P,4::_<7—QP_A Call 425-771-0220, Ext 1326for a 24-hour voice -recorded inspection request line. FINAL APPROVAL OF PERMITTED WORK: t� DATE i4sh, ector's Signature NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE CADocurnents and SettingsTurtisNy Documents\Fonns\Engnrng\ROWpermit_,doc Revised 10/01/03 a). ..: Ai WORK IN TRAVEL LANE (MAINTAINING TWO-WAY TRAFFIC, 35 MPH OR LESS) W20-1 deft m OR IV .W1 4R' 01 X 0: U. �7 V) TOOLBAR ACCESS AND CELL NAME V) 0 0 ISO/— .6 .0 -1L ",,- [m MIN MI @ oil 0 SPEED LIMIT SIGN SPACING A, B (FT) SHIFTING TAPER (FT) BUFFER (FT) 1 61 SHIFT 12'SHIFT 25 200 35 65 55 30 200 45' 90 85 35 t- 350 65 125 APPROVEED AS NOTED BY ENGINEERING r Date: 24 HR. NOTICE REQ. FOR INSPECTION cy- w L- u- 1�::) mv Oil z cr N'\-CELL NAME: SRLI OF I TESTING LABORATORY, INC. NO, 2657 TESTING & INSPECTION McCASCADE 12919 N.E. 126TH PLACE KIRKLAND. WASHINGTON 98034 (425) 823-9800 EVERETT (425) 259-0817 DATE FCE R IT. NO. DENSITY FIELD REPORT PROJECT TO:— �ovf'a- SaOF-V 7 r C6�1 spf 9 .9 ci hi o"'t's 7�r t4r+s I c�,:Q 19 73 V-**- J 0 LOCATION 4-k ILI p ig BLDG. PERMIT NO. OWNER WEATHER TEMP. ATTN: AT A.M. IR n AT P.M. SAMPLE DESCR.IPTION/SOURCE ENGINEER cp,qr,51- d4nd !!4zlr4k' Eli PLACEMENT AREA I e ARCHITECT -�;f 6 -am ell OR TEST METHOD CONTRACTOR ASTM D-2922 SOIL Ila- D-2950 ASPHALT 0 IQUIPMENT USED 1. D. '7�-Pxlev 'PY90 NUCLEAR DENSOMETER S/N# 1-5 #1 DSMPTION OF LOCAITON PROBE DEPTH ELEVA'nON IN FEET WET DENSITY, MO TURE CMENT, DRY DE�r PROCrOR VALUE, OPTIMUM MOISTURE, COMPACTION, PCF % PCF % % dl, 4 �. � 33,0 f� 9� 5-,,S 19,5 2 3 _5j,4!5,.cc(e 41 5 6 7 8 9 10. --ILLU�TRATION OF SITE JY.7' , S CK? TEST OBSERVATIONS AND RffvIARKS: 0-1 -4, 14 C, c li Z:-L� :---> On 4 f 4dvi ;,l rP4 k-,144 a ?Lr r-7 'ry ald cv��t o C�g�-cl us-""7!!� Ir Ac v6r� o t - - 10 4 e- /c - I r; r 6 - 9,q,j e, d- r'r. L, v4 a,,, a. r P-a-s '4zs h J INSPECTOR, NAME(S) PRINTED 7T Vq\ a TEST RESULTS APPLY ONLY TO THE ITEMS INSPECTOR SIGNATURE taA e't� HEREIN TESTED. THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL, WITHOUT THE WRITTEN APPROVAL OF CASCADE TESTING LABORATORY, INC. SIGNED R evised 7-05. COPIES TO: I- - - 7'; C�-& ��/- � OV E L)Af Un CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 JtHONE: (425) 771-0220 - FAX: (425) 771-0221 *Pip WST BE POSTEDON JOBSITE* STATUS: F-P I med rSSU07T ENG20090324 RIGHT OF NVAY PERM IT (3-Cominercial) Permit Number: ENG20090324 Expiation Date: 6/18/2010 Job Address: 410 4TH AVE N, EDMONDS Location: APPLICANT CONTRACTOR Public Facilities District EARTH -TECH DEVELOPMENT INC. 554 SEAMONT LN EDMONDS, WA 98020- EDMONDS, WA 98020- (206) 300-9787 Ext. LICENSE #: EARTHTDO03K4 EXP: 2/11/2011 Install storm drainage improvements on private property and connect to e)dsting City storm system in 6th Ave S. DISRUPTION IN[, VHON ASSESSED VALUE: $0.00 PROPERTYAREA: 0 SIDEWALK: (OXO DURATION IN MONTHS: 0 FEE: $0.00 STREET DISRUPTION TRENCH CUT: 0 x 0 PARKING: OXO DURATION IN MONTHS: 0 FEE: $0.00 YEAR OF OVERLAY: 0 FEE: $0.00 ALLEY: OX0 DURATION IN MONTHS: 0 FEE: $0.00 INDEMNITY- The Applicant has signed an application which slates helshe holds the City ofEdmonds harmlessfrorn injuries, damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City ofEdmonds or any ofils departments or employees, including but not limited to the defense ofany legal proceedings including defense. costs and altorneyfees by reason ofgranting this permit. THECONTRACTIOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OFONEYEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK • Traffic Control and public safety shall be in accordance With City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possesion. • Restoration is to b e in accordance with City codes. All street -cut trench work shall be patched With asphalt or City approved material prior to the end of the workday- NO EXCEPTIONS. • Three sets of construction drawings of proposed work are required with the permit application. CALL DL41,A-DIG (1-800-424-5555) BEFORE ANY EXCAVAT]ON CALL FOR INS PECTION (425) 771-0220 EXT. 1326 24 HO UR NO-nC E RFJQ UIRED FO R ALL INS PECTIO N REQ UESTS THIS APPLICATION IS NOT A PERNUTUNTIL SIGNED BY THE CITY ENGINEER OR HISMER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN SPACE PROVIDED. SED BY Printed: Tuesday, December DATE g;_ECOPY �,*INS PECTOR CO E] APPLICANT COPY r",# STATUS: READY TO ISSUE ENG20090324- • Restore ROW to City standards • Restore Landscape to like or better conditions. • Call for locates of underground utilities prior to any excavation. • Alert affected residents and/or businesses prior to work start. • Conform to approved working drawings and Traffic Control plan. • Public utilities maintain 5'separation fromCity Utilities. • Utility patch restoration to be in accordance with Edmonds Standard detail E2.3 • Maintain erosion & sedimentation control. Keep street clean. • Construction hours are Monday -Friday 7an-t-6pm and Saturdays 10an-t-6pm No work on Sundays or Federal Holidays. • Call for required inspections as noted. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Sound[Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays'and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise firnits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indernnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents , from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit ih any way the City's ability to enforce any ordinance provision. • E-Traffic Control • E-Curb/Gutter Pre -Pour • B-Sidewalk Pre -Pour • EPavement Subgrade • E-Pavement Compaction Test Report • E-Pavement Striping • E-Engineering Final • E-Storm Main,Installation • ECurb/Gutter Post -Pour • E-Sidewalk Post -Pour PARTIAL INSPECTION DATE: INITIAL: PARTIAL INSPEC'1710N DATE: INITIAL: FINAL INSPECTION APPROVED DATE: J7_1 10 IMTIAL;o�NAAJX_ -I. -I, k_-J I NOTES: NOTES: ei I OCT-04-2005 09:04 P. 02/03 I L) "J ol�f.05 A /Z7- 1014los- - F�-e(-o .5-uRve-x J.,�:>,q �127-105 rf,e L D 6 F-'C L'j ' P Y A5 TX0WAf�014 OR// SuRve /V 1plzorlt.e vi-II&I Or 5�,X/-577 All ECEIVED L o ojk lvd N OR-77/, OCT - 7 2005 Af 0 S c- A e- C- BUILDING DEPT. STREET FILE 5,1 /V I Nwill)NOW - zz FL —LS i-y-wo0w wba) ;r'3 -A?Jvw a Y�owp2lvjg V9 I j 0 Jv 0()p5 j go bl�� I v8j5v Ad S5 V-aq -a 415 -AIV PIN Ol �01 v 5 f 1; \�v 615 -Al 1410 A� 20/20, d fw -) t70:60 SOOE-VO-130 6 IP C. 1 SW� CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221 Website- www ci edmonds wa us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering August 26, 2004 Mr. Sherrill Myers, REBA LMN Architects 801 Second Avenue, Suite 501 Seattle, Washington 98104 STREET FILE' GARY HAAKENSON MAYOR RE: Edmonds Center for the Arts, Request for Alternate Design for Wheelchair Lifts Dear Mr. Myers: In response to LMN Architects' and Pielow Fair Associates' request for accessible alternate design associated with the remodeling work at the Edmonds Center for the Arts Theater building; as Building Official for the City of Edmonds I find that your firm has provided satisfactory justification to demonstrate that the proposed lifts, used in limited areas, are an equivalent alternate design and methodology that complies with the intent of the accessible codes in International Building Code Chapters I I and 34. The lifts shall be used to provide access between certain portions of the theater as described in the Pielow letter dated August 2, 2003 that includes; the balcony level to the second floor administrative level, and from the lobby to the dressing room area. Note, if during formal plan review, changes to the plans are required that effect the lifts, the alternate design may be required to be altered. Further, review of accessibility requirements other than the lifts providing path of travel approved under this alternate design, will be done during the permit review process. As a condition of approval, because the lifts may not always be attended by an operator, a user annunciator system shall be provided at each lift (subject to review and approval by the Building Official). It is important to note that all primary function areas of the theater (i.e., lobby, seating, stage, etc.) shall be provided with full code complying accessibility via prescriptive code methods (i.e., an elevator, ramps, grade level access, etc.). Note, this request for alternate design is pursuant to the provisions of the International Building Code (BBC) Section 104.11, (2003 edition effective 7/l/04) and is granted because the Architect of record has provided sufficient evidence that the alternate lift method is equivalent of that prescribed in the code in quality, strength, effectiveness, fire resistance, durability and safety. Sincerely, Jeannine L. Graf Building Official, C.B.O. 0 Incoroorated Auaust 11. 1890 0 11 M Apri129,1998 Ms. Jeannine L. Graf Community Services Department City of Edmonds 121 5hAvenue North' Edmonds, WA 98020 RE: Gymnasium Floor Repair Permit #950736 Dear Ms. Graf N-0 4p'p 3 114114 111AIG 'Sod llepz- Enclosed please find two test reports performed by US Testing on the SmartCells floor assembly: (1) ASTM E-648-95a, "Standard Test Method for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source", and (2) ASTM D-2859-96, "Standard Test Method for Ignition Characteristics of Finished Textile Floor Covering Materials". Please note that results of the ASTM E-648-95a test was an average Critical Radiant Heat Flux of 0.36 Watt/crn�; the 1988 Edition of the NFPA "Life Safety Code" provides a CLASS II classification for materials which have a minimum Critical Radiant Flux of 0.22 watts/cm�. Results of the ASTM D-2858-96 were listed as follows: of the eight specimens submitted, 8 passed, 0 failed. Acceptance criteria for this test is that at least seven of eight specimens tested shall pass the test criterion. Please feel free to contact me should you have any questions. TMV/sh cc: Sheryl Criss Adrian Jenkins Sincerely, Sean-Aess Attenuating Technologies, Inc. -)O�,-, 07Vey 70, 644 Thomas M. Vaux President MICROFILM F_ I L E L07s, win N L ANI 01 Kid: SGS U.S. Testing Company Onc. 5555 Telegraph Road Los Angeles, CA 90040 Tel: 213 838-1600 Fax: 213 722-8251 CLIENT: SATECH 901 Kirkland Avenue Kirkland, WA 98033 REPORT NUMBER: 740896 DATE: 10/2/97 PAGE: I OF 3 SUBJECT: CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS REFERENCES: 1. Testing conducted on October 1, 1997. 2. Testing authorized by Thomas M. Vaux. 3. Test samples received on September 22, 1997. SAMPLE ID: The Client submitted and identified the sample as: Smart Cells Basketball Floor TEST PROCEDURE: The submitted sample was tested for flammability in accordance with the procedures outlined in ASTM E648-95a, "Standard Test Method for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source". The foregoing test procedure is comparable to NFPA No. 253. PREPARED BY: SIGNEDJFOR COMPANY BY: ft Greg Banas Michael S. llio Test Technician Manager/Fire Tech. Dept. Member of the SGS Grow ANALYTICAL SERVICES - PERFORMANCE TESTING - STANDARDS EVALUATION - CERTIFICATION SERVICES SGS U.S. TESTING COMPANY INC. REPORTS ARE FOR THE EXCLUSIVE USE OF THE CLIENT TO WHOM THEY ARE ADORESWD. ANYONE RELYING ON SUCH REPORTS SHOULD UNDER- STAND ALL OF THE DETAILS OF THE ENGAGEMENT. REPORTS REFLECT RESULTS ONLY OF THE STANDARDS OR PROCEDURES IDENTIFIED TO THE TESTS CONDUCTED AND ARE LIMITED TO THE SAMPLES TESTED. TEST RESULTS MAY NOT BE INDICATIVE OF THE QUALITIES OF THE LOT FROM WHICH THE SAMPLE WAS TAKEN. SGS U.S. TESTING COMPANY INC. HAS NOT CONDUCTED ANY OUALITY CONTROL PROGRAM FOR THE CLIENT NEITHER THE NAME, SEALS, MARKS NOR INSIGNIA OF SGS U.S. TESTING COMPANY INC. MAY BE USED IN ANY ADVER. TISING OR PROMOTIONAL MATERIALS WITHOUT T14E PRIOR WRITTEN APPROVAL OF SGS U.S. TESTING COMPANY INC. THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL WTTH­ OUT THE WRITTEN PERMISSION OF THE SGS U.S. TESTING COMPANY INC. SAMPLES NOT DESTROYED IN TESTING ARE DISPOSED OF AFTER 30 DAYS. 0 "Am N I Ali SM *020 SGS U.S. Testing Company Inc. REPORT NUMBER: 740896 DATE: 10/2/97 PAGE: 2 OF 3 CLIENT: SATECH PREPARATION AND CONDITIONING: The sample was submitted in three sections 10" wide by 42" long. Prior to clamping the floor covering system in the mounting frame, the specimens were conditioned at 21 :1: 30C and a relative humidity of 50 ± 5% and allowed to reach moisture equilibrium. TEST PROCEDURE: The test chamber was pre -heated for one hour and the radiant panel black body temperature verified to be within 50C of the temperature established during calibration. The pilot bumer was ignited and the specimen inserted into the chamber. After a five minute pre -heat, the pilot burner flame was placed in contact with the specimen for five minutes, then removed. The test was continued until all flaming ceased. The distance burned was measured and converted to Critical Radiant Heat Flux at flame out. TEST RESULTS: Sample: Smart Cells Basketball Floor Specimen Burn Distance Number Centimeters 1 47.5 2 48.5 3 51.0 Average 49.0 OBSERVATIONS: Charring and smoke evolution was noted. Critical Radiant Heat Flux, Watt/CM2 0.38 0.37 0.34 0.36 MIF% 10'�'OFILM 0 0 1 t7cf,pe. Eli 11-2 1 MR H1 1 0 AINE NJ N@ CWOUR 0 SGS U.S. Testing Company Inc. CLIENT: SATECH REPORT NUMBER: 740896 DATE: 10/2/97 PAGE: 3 OF 3 REQUIREMENTS: The 1988 Edition of the NFPA "Life Safety Code" provides the following classification for regulating interior flooring materials in specified occupancies: CLASS I - Includes materials which have a minimum Critical Radiant Flux of 0.45 watts/cM2. CLASS 11 - Includes materials which have a minimum Critical Radiant Flux of 0.22 watts/cM2. Examples of the requirements for application of interior flooring material in exits and corridors for specified occupancies are listed below. Health Care Centers Class I in new facilities and for newly installed flooring materials in existing facilities. Child Care Centers Class I or 11 in both new and existing facilities. Hotels and Dormitories Class I or 11 in both new and existing facilities. ARartments Class I or 11 in both new and existing facilities. End of Report 0 0 1 A 1jol F�A; 'oil lEffis" 5555 Telegraph Road Los Angeles, CA 90040 Tel: (213) 838-1600 Fax: (213) 722-8251 SGS U.S. Testing Company 6nc. CLIENT: SATECH 901 Kirkland Avenue, Suite 82 Kirkland, WA 98033 REPORT NUMBER: 752408 DATE: 10/20/97 PAGE 1 OF 1 SUBJECT: FLAMMABILITY OF SMART CELLS@ BASKETBALL FLOOR REFERENCE: Client's letter dated 10/06/97 and confirmation dated 10/16/97 signed by Thomas M. Vaux. SGS USTC Tracking No. 26771 dated 10/13/97. SAMPLE ID: Eight (8) specimens of Smart Cells@ basketball floors received from GACO Western on 10/13/97. TEST PROCEDURES: Flammablilly per ASTM D 2859-96, "Standard Test Method for Ignition Characteristics of Finished Textile Floor Covering Materials" and referenced Code of Federal Regulations, Title 16, Chapter 11-CPSC (1-1-97 Edition), Part 1630. TEST DATE: RESULTS: PREPARED BY: Requirements: Test Criterion: Acceptance Criteria: October 16, 1997 The charred portion of a tested specimen shall not extend to within 2.54 cm. (1.0 inch) of the edge of the hole in the flattening frame at any point. At least seven of the eight specimens tested shall meet the test criterion. Flammabilfty per ASTM D 2859-96, Pill Test No. of Specimens Tested: 8 No. of Passing: 8 No. of Failures: 0 Compliance: Pass SIGNED FOR COMPANY BY: M CU Y. L. Yeung Norma G. I nnidad Technician Manager ljn Member of ft SGS Grow Material/Textiles Department ANALYTICAL SERVICES - PERFORMANCE TESTING - STANDARDS EVALUATION - CERTIFICATION SERVICES SGS U.S, TESTING COMPANY INC. REPORTS ARE FOR THE EXCLUSIVE USE OF THE CLIENT TO WHOM THEY ARE ADDRESSED. ANYONE RELYING ON SUCH REPORTS S14OULD UNDER- STAND ALL OF THE DETAILS OF THE ENGAGEMENT. REPORTS REFLECT RESULTS ONLY OF THE STANDARDS OR PROCEDURES IDENTIFIED TO THE TESTS CONDUCTED AND ARE LIMITED TO THE SAMPLES TESTED. TEST RESULTS MAY NOT BE INDICATIVE OF THE OUALITIES OF THE LOT FROM WHICH THE SAMPLE WAS TAKEN. SGS U.S. TESTING COMPANY INC. HAS NOT CONDUCTED ANY DUALITY CONTROL PROGRAM FOR THE CLIENT NEITHER THE NAME. SEALS, MARKS NOR INSIGNIA OF SGS U.S. TESTING COMPANY INC. MAY BE USED IN ANY ADVER- TISING OR PROMOTIONAL MATERIALS WITHOUT THE PRIOR WRITTEN APPROVAL OF SGS U.S. TESTING COMPANY INC. THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL WITH- OUT THE WRITTEN PERMISSION OF THE SGS U.S. TESTING COMPANY INC. SAMPLES NOT DESTROYED IN TESTING ARE DISPOSED OFAFTER 30 DAYS. Floor made from shoes be ing 0 installed at collltk� By BILL SHEETS EDMONDS — In the next few months, NBA players will be lacing. em up and running in Edmonds. ' No, the city has not been awarded a franchise. No Edmonds Seagulls, no Edmonds Beachcombers. - But it's no joke, either. In March and April, members of five to eight National Basketball Association teams, including the Seattle Super- Sonics, will visit Edmonds to try the new floor being installed at Puget Sound Christian College. The $160,000 "SmartBits" floor is made of 15,000 old. sneakers and 525 scrap tires. The technology combines safety --: extensive tests have revealed it iseasier on the legs than wood floors, according to the company — and recycling. But unlike the Tartan urethane floors of the '70s, "it gives the same friction and play as wood," said Tom Vaux, president of SATECH of Kirkland, which pioneered the floor. Puget Sound Christian College, at .�i Photo by Bill Sheets New athletic shoes will run up and down a floor made from old athletic shoes at Puget Sound Christian College. 410 Fourth Ave. N., was selected for the installation of the very first SmartBits floor because it is an i.so- lated facility and "the college has a real cooperative staff," said Vaux. � The college was contacted by a public relations person, said Dorral' Campbell, PSCC's director of de- velopment. 'They were looking for a gym to do it in," he said. The college gets the floor for free. The floor is made from 40 percent recycled sneakers and tires and 60 percent rubber, oils and polyurethane. It is covered with a simulated wood finish that gives it- self away only on close inspection. "It looks the same, the ball bounces the same and sounds the same," Vaux said, The springiness comes partly from the fact that it is not solid all the way through, but instead con- sists of thin layers connected by many small, vertical pillars. The net result, says Vaux, is 2 to 3 percent less fatigue and fewer injuries, en- abling players to sustain intense levels of activity for longer periods of time — both within a game and, for frequent players, within a career or a lifetime.' . The.base layer for the floor is like that used beneath playground equip- ment for safety — SATECH's pri- mary line of business. The company survived a competitive - bidding process to receive $70,000 in state and federal money to conduct test- ing on,the floor's technology before it. was installed and for continued testing . afterward. Installation at PSCC is expected to be complete by the end of February. - The money is distributed through Clean Washington Center, a sub- sidiary of the state Department of Community, Trade and Economic Development. The center's role is to promote use of recycled materials by manufacturers, said Elizabeth Burger, assistant marketing manag- er. While recycling has boomed on the collection end, companies' re- luctance to spend money to convert to equipment that accommodates re- cycled materials has limited its use, Burger said. The company provides informa- tional support, and in some cases, technological, financial and market- ing support to companies thinking of converting. VJD Lo f+i!6r Akl�6n t�C-� 7-o 74- Pr�,5 W000p qrx- N 65WT- ,/T STREET USE PERMIT APPLICATION NAME OF APPLICANT: e� -5'at"flo NAME OF BUSINESS: . MAILING ADDRESS: Q - ILE - fi- 0600nD-S kJfi- 5�C—OOV --3J'7J CONTACT PERSON AND PHONE ADDRESS OF PUBLIC USE: %/0 q,&,gw I er' Describe the public place or portion of p�klic space -to be utili IF MAE �Aff "M �k Specify the length of time for use: ' Y-16 —16 q — c;'9—'7,6 NOTE: The issuance of this permit is understood by the applicant to be of a temporary natureand that no vested right is granted. INDEVNITY. The applicant understands and by hislher signature to this application, agrees to hold the City ofE&nonds harmlessfrom any injuries, damages or claims of any kind or description whatsoever. foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but, not limited to the defense or any legal proceedings including defense costs, court costs and attorneyfees by reason ofgranting this permit In addition, the application understands that the City shall be provided a Certificate of -Insurance to indemnity and hold harmless the City of Edmondsfrom all claims andlor property damage, and naming the City of Edmonds as an additional insured CODEAPPLICATION. By signing the application below the applicant warrants that s1he has read or had the opportunity to read Chapter 18 of the Edmonds Community Development Code and s1he understands that all terms of the adopted ordinance are incorporated herein as ifselforth infull and this application andpermits therefore are subject to the terms of that Chapter GNA TE STRUSEHO.DOCJLG/2-95 NOI 0 10: L -ITE�- TEL `:47 02 970 P02 .HFV, - It: '9t. T UE I .. . . .... ......... DATE IMMIDDrfV) CGR No CERTIFICATE OF INSURANCE, rw FUQL -2 04/16L96 :PUCM THIS CERTIFICATE 19 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Assoc In* Broker, Inc HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P o Box 457 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Stanwood WA 98292 -- COMPANIES AFFORDING COVERAGE COMPANY Jim Jonson A Preferred Risk Insurance CO. - 160-629-2103 NSURID MPANY Puget Sound Christian Colle90 MPANY Attn: Merle Beagle Flo, C 410 4th Avenue North COMPANY Zdmonds WA 98020 D .1 TH . I . S .. IS .. To CERTIFY THAT THE POLICIES OF INSURANCE LISIEO BELOW HAVE BEEN ISSUEO TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWI TH STANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCI USIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY H . AVE BEEN REDUCED BY PAID CLAIMS. 7---- POLICY NUNIBER �1POUCY1FFSCTIV1 POUCVILXPIPATION LIMITS LTA I DATE IMM/D01YY1 DATI IMMfDDfYYI CO Typg OF INsUPLAWCF I I OINERAL UAINUTY A X COMMERCIAL GENERAL L!ASILI-- CLAIMS MADE OCCU9 OWNER'S & f7 ()N T PACTOR'S PROT AUTOMOBILE UABIUVV ANY AUTO ALL OV- 5C, Oil ��": -�, : I - GARAGE UA1UUTY —1 ANY AUTO &xcus UAMUTv UMBRELLA FoFtm OTHER THAN UMBRELLA WORKW9 COMPIIINSATION A EMPCOYMS UADAIJTV THE PROPRIETOR/ INCL PARTNERS;fXECVTIV( OFFICERS ARE: R EXCL QfNeAAL AGGRCGATf Js 3,000,000 9620-698 10/01/951 10/01/96 t) 6 3,000,000 PERSONAL III ADV s 11000 000 EACH 0(,-CURH(NCE 2, 00,000 FIRE DAMAnE JAriy — ti,e) t 50,000 MED 19P (A,%v o,w "np.n) f 5,000 COMBINED SING� f LiMly 6 800ILY IN.IVRY BOOILY INJL'kY (PS, accldeM) .ONLY EA A( k AuTLJ CJ�,,,,Et4 T 6 01HEA YHAN AVTQ "IN, 1. EA01 A(:( iPfN T r. EACH OCrL)RRVN-k:F AGGREGATE STATUTORY LIMIT'> EA17#4 ACGMEN't DISEASE - POLICY LIMIT S DiSEAS( EACH EMPLOI(FF I WCWyION OF OPOkAT&OWWLDCATIONSIVLMrL9616veGI^L 13UMV It is undqrptood and agreed that the City of Edmonds is named as Additional Insured with respect to Construction Project oY-Puget Sound Christian college FIEFIT4140ATE HOLDER City of Edmonds building Division 250 5th Avenue North Edmonds WA 98020 IcANctLLATION EDM0002 SHOULD ANY OF THE ABOVE DL8CR)0XD POLICIES BE CANCELUD 13EFORE THE tXPIPtATION DAY E THEREOF. YHE ISSUING COMPANV WILL ENDEAVOR TV MAIL DAYS WRITTEN NOYICE TO THE CIEFITIRCATE HOUDER NAMED TO THE LEFT. BUT FAILURE To MAIL SUCH NOTICE WALT, IMPOSE NO OBLIOATION OR UABIUTY Of ANY KIND UPON VO4C COMPANY, ITS AOLNTS OR RtMESIENTATWES. AUT040POZED REPRESENTATIVE Jim JOBS Guidant Of Insurance Company (GMI)' The Guidant L.. - -nsurance Company (GLI) dant Guidant Elite Insurance Company (GEI) Guidanl Specialty Mutual Insurance Company (GSM) G Guidant Lloyds Insurance Company (GLL) Insurance Group Guidant America Insurance Company (GAI) 1111 Ashworth Road, West Des Moines, Iowa 50265-3538 ADDITIONAL INSURED STATE OF POLITICAL SUBDIVISION CITY OF EDMONDS. BLDG DIVISION 250 5TH AVE. NORTH EDMONDS WA 98020 RESCINDING NOT71E�/ COMMEF CIAL PACKAGE POLICY NUM BER 9620-698 is FAMILY JACKET 009620698 ACCOUNT NUMBER 009620698-01 AGENT 46-896 THOMAS & ASSC INS BRKS INC 9715 271ST STREET NW STANWOOD, WA 98292 (46) (360)629-2103 I INSURED PUGET SOUND CHRIS TIAN COLLEGE 410 4TH AVENUE EDMONDS WA 98020 THE CANCELLATION NOTICE FOR NON-PAYMENT OF PREMIUM TO BE EFFECTIVE 04/25/99 IS RESCINDED AND CONTINUOUS COVERAGE IS PROVIDED. IF THERE IS A BALANCE DUE ON THIS ACCOUNT, IT WILL BE INCLUDED IN YOUR NEXT INVOICE. MEMORANDUM COPY SYyz e-,,-( 71� / e- 040899 USCLU Guidant h * Insurance Company (GMI) 'The Guidant L. 5surance Company (GLI) Guidant Elite Insurance Company (GEI) Guidant Specialty Mutual Insurance Company (GSM) Guidant'" Guidant Lloyds Insurance Company (GLL) Insurance Group Guidant America Insurance Company (GAI) 1111 Ashworth Road, West Des Moines, Iowa 50265-3538 ADDITIONAL INSURED STATE OF POLITICAL SUBDIVISION CITY OF EDMONDS. BLDG DIVISION 250 5TH AVE. NORTH EDMONDS WA 98020 FAMILY JACKET 009620698 ACCOUNT NUMBER 009620698-01 AGENT 46-896 THOMAS & ASSC INS BRKS INC 9715 271ST STREET NW STANWOOD, WA 98292 (46) (360)629-2103 INSURED PUGET SOUND CHRISTIAN COLLEGE 410 4TH. AVENUE ',Eb'MONDS WA 98020 41�-1 [ , .... ........ 00�TICOF CANCELLATION 1--r�OMM-EFC61AL PACKAGE POLICY NUMBER 9620-698 OUR RECORDS INDICATE THAT YOUR PREMIUM PAYMENT WAS NOT RECEIVED BY THE DUE DATE. THE POLICY DESCRIBED HEREIN IS CANCELED FOR NON-PAYMENT OF PREMIUM EFFECTIVE 12:01 A.M. STANDARD TIME ON 04/25/99. HOWEVER, YOU MAY CONTINUE YOUR POLICY WITHOUT INTERRUPTION. THE MINIMUM PREMIUM DUE MUST BE RECEIVED BEFORE THE CANCELLATION DATE. WE APPRECIATE YOUR BUSINESS AND UNDERSTAND THAT OVERSIGHTS CAN OCCUR. HOWEVER A $25 LATE CHARGE WILL BE INCLUDED IN YOUR NEXT STATEMENT. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT YOUR AGENT LISTED ABOVE. POLICIES INCLUDED WITHIN THIS ACCOUNT ARE - MEMORANDUM COPY 3909-139 9620-698 040599 UBCL92 CITY OF'EDMONDS CIVIC CENTER - EDMONDS, WA 98020 - (206) 771-0247 - FAX (206) 771-0252 OFFICE OF THE MAYOR 1 8 9 0 - 199 - July 24, 1996 R- Allan Dunbar President Puget Sound Christian College 410 4th Avenue North Edmonds, WA 98020 Dear President Dunbar: BARBARA FAHEY MAYOR dl/j Z'o 'P,4&�!:. IV ',996- 46 44pr. As promised, I did some checking on parking requirements. Enclosed is a copy of the ordinance as it relates to the College. You are a nonresidential college since you have no living quarters (dormitories) within the building in question. Any apartments for student residences would have parking assigned to them. The ordinance requirement for the College is one space per employee. I asked about the auditorium and was told as long as all remodeling was inside and seating was not significantly changed no additional parking requirements would be made. We could move forward with a remodel without having to address that issue. I feel better about the project with these concerns put to rest. Let me know if I can provide any future assistance. Sincerely, Barbara F ey Mayor BF/dm Enclosure c: Community Services Director Planning Manager WmWord6\CS96\Dunbar * Incorporated August 11, 1890 * Sister Cities International — Hekinan, Japan IT.50.030 a. The type of storage facility (moor- age, dry storage, trailer parking) and intended use (sailboats, fishing boats, leisure boats), b. The need to accommodate over- flow peak parking demand from other uses accessory to the marina, c. The availability and use of public transit; 18. Storage warehouse: one space -per employee; 19. Wholesale warehouse: one space per employee. C. Community Facilities. 1. Outdoor places of public assembly, including stadiums and arenas: one space per eight fixed seats, or per 100 square feet of assembly area, whichever is greater; 2. Theaters:one space per five seats; 3. Indoor places of public assembly, including churches, auditoriums: one space per four seats or one space per 40 square feet of assembly area, whichever is greater; 4. Elementary schools, junior high schools, boarding schools (elementary through senior high), residential colleges and universi-, ties: six spaces per classroom, or one space per daytime employee, whichever is greater; 5. Non-residential colleges and univer- sities: one space per daytime employee; 6. High schools (senior): one space per daytime employee; 7. Museums, libraries, art galleries: one space per 250 square feet; 8. Day-care centers and preschools: one space per 300 square feet, or one per employee, plus one per five students, which- ever is larger; 9. Hospitals: three spaces per bed; 10. Maintenance yard (public or public utility): one space per two employees. [Ord. 2352 § 9, 19831. 17.50.030 Calculations. A. Square Feet. Unless otherwise specified, square feet refers to the gross building square footage, including outdoor areas used for the same use (such as an outdoor eating area for a restaurant). B. Combination of Uses. Combination of uses shall meet the requirement based on the sum of all the uses reduced by any applicable joint use provisions (see ECDC 17.50.060). Examples of such combined uses are: a furni- ture store with a retail display area and attached storage warehouse, a storage ware- house with attached office, a church with a parochial school, and so forth. C. Different Uses on Same Site. The requirement for different uses on the same site shall be the sum of all requirements for the individual uses, reduced by any applicable joint use provisio ns. D. Uses Not Specified. Any use not listed above shall meet the requirements of the most similar listed use as determined by the commu- nity development director. E. Fractions. When the requirements of this chapter result in a fractional number of parking spaces, one space shall be provided for a frac- tion of one-half or more, and no space shall be required for a fraction of less than one-half. 17.50.040 Location. A. Perrriitted Uses in Residential Zones. Off-street parking shall be located on the same lot and within 100 feet walking distance of the use for which it is required. B. All Other Uses. Off-street parking shall be located within 300 feet walking distance of the use for which it is required, except that the only requirement of the location of off-street parking required for a use in the downtown business area shall be that such parking be located within the downtown business area that is zoned for commercial business (BC). If the * off-street parking is not on the same lot as the use for which it is required, the owner or lessor shall provide to the city for recording with the county auditor an agreement specify- ing: 1. The location, by legal description or survey, of the off-street parking and the use for which it is required; I 17-12 RECEIVED, SEP 2 2 2000 BUILDING DEPT. A N N U A L R E N E W A L C E R T I F I C A T E POLICY NO. 9620-698 NAMED INSURED PRODUCER NAME AND ADDRESS PUGET SOUND CHRISTIAN COLLEGE THOMAS & ASSC INS BRKS INC 9715 271ST STREET NW 410 4TH AVENUE STANWOOD WA 98292 EDMONDS WA 98020 46-896 (46 (360)629-2103 ADMIN. 14-666 RENEWAL PERIOD: FROM 10/01/00 TO 10/01/01 VALUABLE - ATTACH THIS CERTIFICATE TO YOUR POLICY. IN RETURN FOR THE PAYMENT OF THE TOTAL PREMIUM SHOWN ON THE COMMON POLICY DECLARATIONS, AND SUBJECT TO ALL THE TERMS OF THIS POLICY, THE ABOVE NUMBERED POLICY IS RENEWED FOR THE PERIOD SHOWN ABOVE. THE POLICY IS BEING RENEWED IN ACCORDANCE WITH RATES AND RULES IN EFFECT ON THE DATE OF RENEWAL. ATTACHED TO AND MADE A PART OF THIS CERTIFICATE ARE COMMON POLICY DECLARATIONS AND CONDITIONS, APPROPRIATE COVERAGE PART DECLARATIONS AND SUPPLEMENTS, AND CURRENT EDITIONS OF FORMS IF EARLIER EDITIONS WERE REVISED DURING THE PREVIOUS PERIOD. THIS CERTIFICATE HAS THE SAME EFFECT AS WRITING A NEW POLICY WITH THE SAME PROVISIONS, CONDITIONS AND INSURING AGREEMENTS. COVERAGE PARTS OF THIS RENEWAL WILL BE BROADENED IN ACCORDANCE WITH THE LIBERALIZATION CONDITION APPLYING TO THOSE SAME COVERAGE PARTS OF THE POLICY BEING RENEWED. INFORMATION SUCH AS CLASSIFICATIONS, LIMITS OR EXPOSURES IS THE SAME FOR THIS RENEWAL PERIOD AS FOR THE PREVIOUS PERIOD UNLESS OTHERWISE SPECIFIED. CHANGES, IF ANY, ARE SHOWN ON THE ATTACHED COVERAGE PART DECLARATIONS OR SUPPLEMENTS. 0 GuideOne Insurance GuideOne Mutual 1111 ASHWORTH ROAD Insurance Company WEST DES MOINES, IOWA 50265-3538 X og/18/oo MEMORANDUM COPY PJDL 71 01 07 89 GOECO032 0 0 C 0 M M 0 N P 0 L I C Y D E C L A R A T 1 0 N S POLICY NO. 9620-698 RENEWAL NAMED INSURED PRODUCER NAME AND ADDRESS PUGET SOUND CHRISTIAN COLLEGE THOMAS & ASSC INS BRKS INC 9715 271ST STREET NW 410 4TH AVENUE STANWOOD WA 98292 EDMONDS WA 98020 46-896 (46 (360)629-2103 ADMIN. 14-666 POLICY PERIOD: FROM 10/01/00 TO 10/01/01 AT 12:01 A.M. STANDARD TIME AT YOUR MAILING ADDRESS SHOWN ABOVE. IN RETURN FOR THE PAYMENT OF THE PREMIUM, AND SUBJECT TO ALL TERMS OF THIS POLICY, WE AGREE WITH YOU TO PROVIDE THE INSURANCE AS STATED IN THIS POLICY. ----------------------------------------------------------------------------- THIS POLICY CONSISTS OF THE FOLLOWING COVERAGE PARTS FOR WHICH A PREMIUM IS INDICATED. THIS PREMIUM MAY BE SUBJECT TO ADJUSTMENT. COMMERCIAL PROPERTY COVERAGE PART $ 3,952.00 FORMS APPLICABLE: SEE COMMON POLICY DECLARATIONS SUPPLEMENT ---------------------------------------------------------------------------- COMMERCIAL GENERAL LIABILITY COVERAGE PART $ 5,102.00 FORMS APPLICABLE: CGO18i/ol96 *CG2011/ol96 CG2028/i185 *PCG351o/o8gg PCG75o6/oigi PCG75o8/o885 PCG7547/0590 PCG7563/0794 ---------------------------------------------------------------------------- COMMERCIAL CRIME COVERAGE PART $ .00 FORMS APPLICABLE: ---------------------------------------------------------------------------- COMMERCIAL INLAND MARINE COVERAGE PART $ .00 FORMS APPLICABLE: ---------------------------------------------------------------------------- MECHANICAL, ELECTRICAL AND PRESSURE EQUIPMENT COVERAGE PART $ .00 FORMS APPLICABLE: ---------------------------------------------------------------------------- FORMS APPLICABLE TO MORE THAN ONE COVERAGE PART: IL0003/0498 IL0146/0488 IL0198/1098 PIL3200/1298 PIL7209/0790 TOTAL PREMIUM OF $9,054.00. COUNTERSIGNED 09/18/00 BY ADATE) (AUTHORIZED REPRESENTA_T1­V`E__ GuideOne Insurance GuideOne Mutual 1111 ASHWORTH ROAD Insurance Company WEST DES MOINES, IOWA 50265-3538 (515)267-5000 . .. ...... . ..... . ....... 09/18/00 MEMORANDUM COPY PJDL 71 00 07 89 GOECO040 9 C 0 M M 0 N P 0 L I C Y D E C L A R A T 1 0 N S S U P P L E M E N T --------------------------------------------------------------------------- POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- COVERAGE PART FORM SCHEDULE --------------------------------------------------------------------------- COMMERCIAL PROPERTY COVERAGE PART FORMS APPLICABLE: CP003o/o695 CP0126/o695 CP1218/o888 CP1525/o695 IL0157/0489 IL0173/0193 PCP3310/0396 PCP3311/1098 PCP3312/0396 PCP73o6/o885 PCP7307/o885 PCP7352/ioq8 *PCP7357/o600 . ......... og/18/oo MEMORANDUM COPY PJDL 71 00 07 89 GDECO040 C 0 M M E R C I A L P R 0 P E R T Y C 0 V E R A G E P A R T 9 D E C L A R A T 1 0 N S P A G E 0 0 POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- BLANKET SCHEDULE --------------------------------------------------------------------------- BLANKET NUMBER 001 BLANKET LIMIT OF INSURANCE FOR INCLUDED PROPERTY PER SCHEDULE IN COMPANY FILE IS $8,894,520. BUILDING AND PERSONAL PROPERTY BLANKET VALUE PERCENTAGE IS 90%. AGREED VALUE LIMIT OF INSURANCE IS THE BLANKET LIMIT AMOUNT SHOWN FOR ALL BUILDINGS AND PERSONAL PROPERTY INCLUDED IN THE BLANKET. RISK PREMISES BUILDING 001 001 001 001 001 002 001 001 003 004 001 004 005 001 005 oo6 001 006 007 001 007 007 001 oo8 007 001 009 09/18/00 MEMORANDUM COPY PCP 73 00 07 89 GOECO060 COMMERC I AL PROPERTY C 0 V E R A G E P A R T 9 D E C L A R A T 1 0 N S P A G E POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- DESCRIPTION OF PREMISES AND COVERAGES PROVIDED THIS POLICY COVERS THE PROPERTY LISTED BELOW. --------------------------------------------------------------------------- RISK NO. 001 PREMISES NO. 001 BUILDING NO. 001 ADDITIONAL INTEREST APPLIES CONSTRUCTION J MASONRY / SPKLD OCCUPANCY MAIN BUILDING PREMISES ADDRESS (CLASS, GYM AUD, & CAFETERIA) 410 4TH AVENUE EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED INCLUDED CAUSE OF LOSS FORM BASIC BASIC COINSURANCE go% go% DEDUCTIBLE $5,000 $5,000 OPTIONAL COVERAGES AGREED VALUE AGREED VALUE INFLATION PROTECTION INFLATION PROTECTION REPLACEMENT COST --------------------------------------------------------------------------- REPLACEMENT COST RISK NO. 001 PREMISES NO. 001 BUILDING NO. 002 ADDITIONAL INTEREST APPLIES CONSTRUCTION FRAME / SPKLD OCCUPANCY PHILLIPS MUSIC PREMISES ADDRESS BUILDING 410 4TH AVENUE EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED INCLUDED CAUSE OF LOSS FORM BASIC BASIC COINSURANCE go% go% DEDUCTIBLE $5,000 $5,000 OPTIONAL COVERAGES AGREED VALUE AGREED VALUE INFLATION PROTECTION INFLATION PROTECTION REPLACEMENT COST --------------------------------------------------------------------------- REPLACEMENT COST RISK NO. 001 PREMISES NO. 001 BUILDING NO. 003 ADDITIONAL INTEREST APPLIES CONSTRUCTION FRAME OCCUPANCY ANCHOR HOUSE PREMISES ADDRESS (WOMEN'S DORM) 6oi 6TH AVENUE EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED INCLUDED CAUSE OF LOSS FORM BASIC BASIC COINSURANCE go% go% DEDUCTIBLE $5,000 $5,000 OPTIONAL COVERAGES AGREED VALUE AGREED VALUE INFLATION PROTECTION INFLATION PROTECTION REPLACEMENT COST REPLACEMENT COST X. .�.ONTINUED ON JOE NEU. PAGE og/18/oo MEMORANDUM COPY PCP 73 00 07 89 GDEC0060 C 0 M M E R C I A L PROPERTY COVERAG E P A R T 9 D E C L A R A T 1 0 N S P A G E POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- DESCRIPTION OF PREMISES AND COVERAGES PROVIDED --------------------------------------------------------------------------- RISK NO. 004 PREMISES NO. 001 BUILDING NO. 004 ADDITIONAL INTEREST APPLIES CONSTRUCTION JOISTED MASONRY OCCUPANCY LIBRARY PREMISES ADDRESS 615 GLEN STREET EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED INCLUDED CAUSE OF LOSS FORM BASIC BASIC COINSURANCE go% go% DEDUCTIBLE $5,000 $5,000 OPTIONAL COVERAGES AGREED VALUE AGREED VALUE INFLATION PROTECTION INFLATION PROTECTION --------------------------------------------------------------------------- REPLACEMENT COST REPLACEMENT COST RISK NO. 005 PREMISES NO. 001 BUILDING NO. 005 ADDITIONAL INTEREST APPLIES CONSTRUCTION FRAME OCCUPANCY WHITE HOUSE AND PREMISES ADDRESS DALEY HOUSE/ (MEN'S DORM - 16 BED) 305 4TH AVENUE NORTH & 316-322 DALEY ST EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED INCLUDED CAUSE OF LOSS FORM BASIC BASIC COINSURANCE go% go% DEDUCTIBLE $5,000 $5,000 OPTIONAL COVERAGES AGREED VALUE AGREED VALUE INFLATION PROTECTION INFLATION PROTECTION --------------------------------------------------------------------------- REPLACEMENT COST REPLACEMENT COST RISK NO. oo6 PREMISES NO. 001 BUILDING NO. 006 ADDITIONAL INTEREST APPLIES CONSTRUCTION FRAME OCCUPANCY GREY HOUSE PREMISES ADDRESS 325 4TH AVENUE NORTH EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED INCLUDED CAUSE OF LOSS FORM BASIC BASIC COINSURANCE go% 90% DEDUCTIBLE $5,000 $5,000 OPTIONAL COVERAGES AGREED VALUE AGREED VALUE INFLATION PROTECTION INFLATION PROTECTION REPLACEMENT COST REPLACEMENT COST CONTINUED ON THE NEXT PAGE og/18/oo MEMORANDUM COPY PCP 73 00 07 89 GDECO060 C 0 M M E R C I A L P R 0 P E R T Y C 0 V E R A G E P A R T D E C L A R A T 1 0 N S P A G E POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- DESCRIPTION OF PREMISES AND COVERAGES PROVIDED --------------------------------------------------------------------------- RISK NO. 007 PREMISES NO. 001 BUILDING NO. 007 CONSTRUCTION FRAME OCCUPANCY STUDENT HOUSING PREMISES ADDRESS (3 BED)/BLUE HOUSE 315 3RD AVENUE NORTH EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED CAUSE OF LOSS FORM BASIC COINSURANCE go% DEDUCTIBLE $5,000 OPTIONAL COVERAGES AGREED VALUE INFLATION PROTECTION REPLACEMENT COST --------------------------------------------------------------------------- RISK NO. 007 PREMISES NO. 001 BUILDING NO. oo8 CONSTRUCTION FRAME OCCUPANCY GARAGE/STORAGE/ PREMISES ADDRESS STUDENT HOUSING REAR 315 3RD AVE NORTH EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED CAUSE OF LOSS FORM BASIC COINSURANCE go% DEDUCTIBLE $5,000 OPTIONAL'COVERAGES AGREED VALUE INFLATION PROTECTION REPLACEMENT COST ---------------------------------------------------------------------------- RISK NO. 007 PREMISES NO. 001 BUILDING NO. 009 ADDITIONAL INTEREST APPLIES CONSTRUCTION FRAME OCCUPANCY STUDENT HOUSING PREMISES ADDRESS (4 BED/RED HOUSE) 311 3RD AVENUE NORTH EDMONDS SNOHOMISH WA 98020 BUILDING PERSONAL PROPERTY LIMIT OF INSURANCE INCLUDED CAUSE OF LOSS FORM SPECIAL INCLUDING THEFT COINSURANCE go% DEDUCTIBLE $5,000 OPTIONAL COVERAGES AGREED VALUE INFLATION PROTECTION REPLACEMENT COST .... ..... . 09/18/00 MEMORANDUM COPY PCP 73 00 07 89 GDECO060 0 0 0 1�1 9 C 0 M M E R C I A L P R 0 P E R T Y C 0 V E R A G E P A R T D E C L A R A T 1 0 N S P A G E POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- OPTIONAL COVERAGE FORMS --------------------------------------------------------------------------- FORM CP0030/0695 BUSINESS INCOME (AND EXTRA EXPENSE) COVERAGE FORM SCHEDULE LIMIT OF INSURANCE IS $300,000 WITH COINSURANCE OF 50%. THIS FORM APPLIES TO THE FOLLOWING PREMISES AND BUILDINGS: SEE THE COMMERCIAL PROPERTY COVERAGE PART DECLARATIONS PAGE. OPTIONAL COVERAGES (IF ANY) ARE INDICATED BY AN "X" BELOW: 1. MAXIMUM PERIOD OF INDEMNITY. 2. MONTHLY LIMIT OF INDEMNITY FRACTION IS 3. AGREED VALUE Is $ 4. EXTENDED PERIOD OF INDEMNITY IS DAYS. 5. BUSINESS INCOME INCLUDING RENTAL VALUE. 6. BUSINESS INCOME OTHER THAN RENTAL VALUE. 7. RENTAL VALUE. FORM CP1525/0695 BUSINESS INCOME CHANGES - EDUCATIONAL INSTITUTIONS SCHEDULE PREMISES BROAD LIMITED NO. COVERAGE COVERAGE 1-1 X ...... ....... . ........... 09/18/00 MEMORANDUM COPY PCP 73 00 07 89 GDECO060 C 0 M M E R C I A L P R 0 P E R T Y C 0 V E R A G E P A R T D E C L A R A T 1 0 N S P A G E POLICY EFFECTIVE 10/01/00 POLICY NO. 9620-698 NAMED INSURED PUGET SOUND CHRISTIAN COLLEGE --------------------------------------------------------------------------- ADDITIONAL INTERESTS - MORTGAGE HOLDERS/LOSS PAYEEADDITIONAL INSURED --------------------------------------------------------------------------- RISK PREM. BLDG. MORTGAGE HOLDERS NAME AND MAILING ADDRESS MORTGAGEE 001 1 1 FRONTIER BANK 001 1 2 PO BOX 70 001 1 3 004 1 4 EDMONDS WA 98020 005 1 5 oo6 1 6 MORTGAGEE 007 1 9 CHRISTIAN DEVELOPMENT FUND INC io65 N PACIFICENTER DR ANAHEIM CA 928o6 FORM CP1218/0888 LOSS PAYABLE PROVISIONS - WASHINGTON SCHEDULE THE LOSS PAYMENT LOSS CONDITION IS INDICATED BY AN "X" BELOW FOR THE DESCRIBED PROPERTY: X LOSS PAYABLE CONTRACT OF SALE PREMISES - BUILDING DESCRIBED LOSS PAYEE NUMBER PROPERTY NAME AND ADDRESS TRANS LEASING INTERNATIONAL LEASE #12-4378--;il--2536---- 3000 DUNDEE ROAD NORTHBROOK IL 60062 ............ 09/18/00 MEMORANDUM COPY PCP 73 00 07 89 GDEC0060 STREETTILE CITY OF EDMONDS LARRY S. NALIGHTEN 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 MAYOR COMMUNITY SERVI CES: PETER E. HAHN Public Works * Planning e Parks and Recreation * Engineering DIRECTOR , 8 9 0 . 19 C� - February 27, 1990 Puget Sound Christian College 410 - 4th Avenue North Edmonds, WA 98020 Attention: John Roberts Dear Mr. Roberts: The backflow prevention devices in your building were recently tested with passing results. I noticed by the test reports that the device which was previously installed for the boiler makeup line has been replaced but not with the type required to adequately protect your water supply. The double check valve assembly must be replaced with a reduced pressure principal assembly. The same type of device which was there before. Please have this installed and tested within 60 days. Sincerely Z144, �i4l Scott Highland Lead Person SH/lk PSCB/TXTWATER .. * Incorporated August 11, 1890 a Sister Cities International — Hekinan, Japan STREET FILE is M E M 0 R A N D U M May 16, 1990 TO: Mayor Larry S. Naughten VIA: Bob Alberts, City Engineer FROM: Gordie Hyde, Engineering Coordinator SUBJECT: NEIL MACKINNON COMPLAINT 1� / -7 - V4-� Aj - Over the past six months, I have had numerous telephone conversations with Mr. MacKinnon. I have made site inspections and have met with Mr. MacKinnon on the site.. The basic problem on 4th Ave. N., between Daley and 3rd Ave., is that visitors -at Puget Sound College park on both sides of a narrow, curved street, which limits visibility from the two driveways that enter 4th Ave. N. in that section. The problem is compounded by the vehicles parked illegally within five feet of the curb cuts for these driveways and the alley. I have reported this condition to the Police Department on several occasions and have suggested to Mr. MacKinnon that he do the same. Mr. MacKinnon initially came to me with this problem and also complaining that people were turning around in his driveway. I have no power to control this situation. Mr. MacKinnon proceeded to place temporary barricades across his driveway entrance, which seems to be an effective, though inefficient, solution. I have investigated solutions through code enforcement and police enforcement. We seem somewhat restricted in what we can do. The only long-term solution that I can see is to have the college provide off-street parking. I do intend to take this to the Traffic Safety Committee to seek solutions from police and other department representatives. I hope that this clarifies the situation, which I feel can be greatly improved through police enforcement. If you have further questions, I'll be glad to help. GCH/sdt MCKINNON/TXTST530 0 0 Nbyor L.S. Naughton City of Edmonds. 505 Bell Street, Edmonds 'Nash 9702 Deart%tyor Naughton: 417 4th Avenue North Edmonds, Washington 98020 (206) 775-5644 April 3rd,1990 C APR 2 1990 Exea&a Offices APR 19 1990 ENC)INFFRIN17, I want to bring to your attention traffic problen-Ls that exist and are growing on 4th Avenue North, in the area of the Puget Sound Christian College. One of the probleins is that young children often dash across the road frorn between parked cars to reach their parents on the opposite side. A few days ago, a young child about 4 years of age dashed from behind a large van to reach her parent on the other side of the street and was almost killed by a car wbich came to a stop, no more than 2 feet away. Another problem ve have is the number of cars parking on the bend that completely block our view when we come out of our driveway. We are virtually blind until we- are in the traffic path. I feel certain that no-one else is aware of the danger potential created over a period of time on a street that often seems quiet and deserted. I am aware of it because I overlook the scene. I would appreciate it if you had someone look into it and become aware of the problem before a tragic accident occurs. 9 Yours F NeilG. ckinnon STREET FILE File No. 01.1.12 Street File September 28, 1984 MEMO FOR RECORD SUBJECT: EDMONDS BIBLE COLLEGE - 410-4TH AVE. N. On September 17, 1984 at 2:00 p.m., Jim Jensen and I received a call from Unit #65 regarding a plugged sewer and high water flow problem at 4th & Daley. Upon our arrival at this location, we met with the employees of the Edmonds Bible College who showed us the problem. We found backed up floor drains for showers in the locker rooms and water backed up into an office room that is also located off the locker rooms in the new addition of the school. They asked us if the problem could be caused by too much flow into these lines because of broken urinals that were not shutting off and running continuously. We told them no. We went to the Engineering Department and looked up any as-builts we could find on the old school and found a location of the school's sewer lines coming out of the building. We returned to the job site and located where water was coming from the building and walked off the distance to a manhole that was shown on the as -built drawing. We found a manhole in the grass that was backed up to the top. To determine whether this was sewage or not, we ran from our manhol'e at 4th & Daley with #24 and hit an obstruction at approximately 50' from the manhole. We proceeded in to approxi- mately 130' and pulled back. Again, when we got back to around 50', we broke loose a heavy accumulation of grease by breaking the plug and dropping the flow in the manhble;in the,grass;in front of the school on the 4th Ave. side. We then returned to the shop. RONNY.A.-HOLLAND Watg�OSewer Division RDH/ml 9-29) 1,r_1 84 C>A) /-OZA� BRENA /DT HIGHLAND DT MARCH ' / ' 5—T MILLS ST STRE5'FILE 09 HARVE H. HARRISON C I T Y 0 P E 0 M 0 200 DAYTON ST. EDMONDS, WASHINGTON 98020 (206) 175-25,:" 1 MAYOR DEPARTMENT OF PUBLIC WORKS March 16, 1981 Dear Resident: On February 17, 1981, the Edmonds City Council passed Resolution 488 for construction, reconstruction a6u, repair of deteriorated sidewalks. A Public hearing will be held in the Council Chambers at the*Civic Center on April 21,1981 at 7:30 P-M..,..Jou are heAj�i.nq_for — discussing repair of po.rti6ns,,of. det.6riora'ted-...".-".,��id('- abuttinq U­� property.--- "' ' 1-41�i; . . yo The�--ir��r6v'c'nit'�ii"L-'�o—f-�-�sidewalks in need of repair at the expense of the abutting property owner is provided by City Ordinance, Chapter 7.20 and. ­ Revised Code of Washington, Chapter 35.68. The areas needing repair have been marked in paint on the sidewalk adjoining your property. Reconstruction -and repair of these sidewalks Must be C0111ploted on or beEore September 1, 1981. In the event improvements are not completed within the above specified time, the City.will perform and complete the impr'ovements at'. the expense of the abutting property owner. This action is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. Sincerely, FRED F.-. HERZBERG 'I Director of Public 'Works hL I') L M I fiLl 1 L � i 'JANUARY 30 APPROVAL Kir-IEET FILE EDMONDS CITY COUNCIL MINUTES January 23,'1979 The regular meeting of the Edmonds City Council was called to order at 7:35 p.m. by Mayor Harve Harrison in the Council Chambers of the Edmonds Civic Center.: All present joined in the flag salute. PRESENT ABSENT STAFF PRESENT Harve Harrison, Mayor Phil Clement Charles Dibble, M.A.A. Mike Herb Leif Larson, Public Works Director Katherine Allen John LaTourelle, Community Develop. Dir. John Nordquist Irene Varney Moran, City Clerk Ray Gould Art Housler, Finance Director Tom Carns Noelle Charleson, Asst..City Planner Larry Naughten Fred Herzberg, City Engineer John Wallace, City Attorney Jackie Parrett, Deputy City Clerk CONSENT AGENDA. MOTION: COUNCILMAN NAUGHTEN MOVED, SECONDED BY COUNCIL14AN NORDQUIST, TO APPROVE THE CONSENT AGENDA. MOTION.CARRIED. The Consent Agenda in.cluded the following: (A) Roll call. (B) Approval of Minutes of January 16, 1979. (C) Acknowledgment of receipt of claim for damages from Richard L. Mooney in the amount of $3,000. L/ (D) Acceptance of Quit Claim Deed in conjunction with short subdivision (Staton). (File S-50-78) (E) Authorization for Mayor to sign Building Use Agreement for Puget Sound College of the Bible. (F) Passa ge of Resolution 422, transferring funds from Contingency Fund to Capital Improvement. Fund for rehabilitation of the Edmonds Museum. COUNCIL Councilman Gould noted that the monthly municipal news bulletin had been renamed "Sound Views" which he fel:t was a very appropriate name. He had an inquiry about a charge on recent utility bills stated as "Inclement Weather." Public Works Director Leif Larson explained that during the recent cold vreather when many people had frozen pipes they hooked up to their neighbors' homes for water and such neighbors were being billed this month only for minimum water usage. / ouncilman Naughten inquired as to what part of the Senior Center was being �reroofed. Public Works Director Leif Larson responded that the south build . ing (the large concrete building) was the one to be reroofed. Ile said the original roof is 15-20 years old, and a topcoat was put on 4-5 years ago but the insulation has deteriorated and there has been considerable patching. Ile said it was recommended that the whole roof be replaced rather than continue to patch it. Councilman Nordquist noted that a letter had been received from Curtis P. Thomson, attorney for LaPierre Industries, Inc. , in which it was indicated that they would not proceed with their petition to be exempted from the in -lieu park fee on their MOTION:, development at 212th St. and 72nd Ave. COUNCILNIAN NORDQUIST MOVED, SECONDED BY COUNCILMAN GOULD, TO REMOVE THE LaPIERPE INDUSTRIES, INC., PETITION FROM THE FEBRUARY 6, 1979 AGENDA. MOTION CARRIED. ** STREET FILE CITY OF EDW-IRIDS CIVIC CENTER - EDMONDS, WASHINGTON 98020 -, (206) 775-2525 D�PARTMENT OF PUBLIC WORKS Mr. Merl Beagle Puget Sound College of the Bible 410 4th Avenue North Edmonds, Washington 98020 Dear Mr. Beagle: HARVE H. HARRISON MAYOR January 25, 1978 In reference to our letter dated September 16, 1977, a follow-up inspection was made by Ken Kukuk, Cross Connection Control Specialist for the City of Edmonds, and the following discrepancies were noted during that inspection: Restrooms - All toilets must be equipped with pressure vacuum breakers between the flushometer and the fixture. We appreciate the expedient effort on your part regarding the other four discrepancies that have*been corrected. As stated in the City of Edmonds Ordinance #1711 requiring the installation of backflow prevention devices, the reduced pressure backflow preventor will have to be tested on an annual basis. Attached please find a copy of the report that was completed on December 27, 1977. We request that this last thirty days. If there are any please feel free to contact the extension 226. KKK: j ac Attachment discrepancy be corrected within questions regarding this matter, Water/Sewer Division at 775-2525, Yours very truly, LEIF R. LARSON, P.E. Director of Public Works 0 RVEIPT FOR CERTIFIED MAIL-30� (plus postage) S, L STMARK .-Me��e Beagle, P.S. Colleae o "BNfe ob STREET AND NO. Cr) 410 4th A,�7o-nu&'N- P.0 STATE AND ZIP CODE co --�dmonas, Washington 98020 I:= OPTIONAL SERVICES FOR ADDITIONAL FEES RE 1 shows to whom and date delivered ............ 150 TUR With delivery to addressee only ............ 650 RCCEIPIT �1' 2� Shows to whom, date and where delivered . 350 SERVICES With delivery to -addressee only ............ 850 DELIVER TO ADDRESSEE ONLY . . ...... 50d SPECIAL DELIVERY (extra fee required) - PS Form NO INSURANCE COVERAGE PROVIDED— (See other side) Apr. 1971 3800 NOT FOR INTERNATIONAL MAIL QP0: 19700-397-400 *0 *0 HARVE H. HARRISON CITY OF EOMC31MOS MAYOR CIVIC CENTER - EDMONDS, WASHINGTON 98020 - (206) 775-2525 DEPARTMENT OF PUBLIC WORKS May 22,.1978 ;--Mr. Merl Beagle Puget Sound College of the Bible 410 4th Avenue North Edmonds, Washington 98020 Dear Mr. Beagle: Please refer to our letter of January 25, 1978,wherein we requested immediate correction on certain discrepancies noted during inspection of your building. As of this date there have been no corrections made. The Municipal Code of Edmonds Section 6.16.250 (2) states that installation of backflow preventors will be made within a thirty (30) day period. This time period has passed since our initial communication with your office. It would be appre- ciated if you would expedite this matter. If the connection is not made within fifteen (15) days, we will terminate water service to the building as required in Section 6.16.250 (3) of* the Edmonds Municipal Code. If you have any questions regarding this matter, please feel free to contact Ken Kukuk, 775-2525, extension 223. Yours very truly, LEIF R. LARSON, P.E. Director of Public Works KKK: j ac '312, az �q 51. z 317, F W I-eadmar Dt. W4,'-S Supt. DT. I ec.1 Dt. STREET FILE 040 STREET FILE CITY OF EDMI-31MOS CIVIC CENTER - EDMONDS, WASHINGTON 98021) - (206) 775-2525 DEPARTMENT OF PUBLIC WORKS Mr. Merl Beagle Puget�-Sound. College of ,-the Bible,'. 410 4th Avenue North Edmonds, Washington 98020 Dear Mr. Beagle: HARVE H. HARRISON MAYOR January 25, 1978 In reference to our letter dated September 16, 1977, a follow-up inspection was made by Ken Kukuk, Cross Connection' Control Specialist for the Ci.ty of Edmonds, and the following discrepancies were noted during that inspection: Restrooms - All toilets must be equipped with pressure vacuum breakers between the flushometer and the fixture. . We appreciate the expedient effort on your part regarding the other four discrepancies that have been corrected. As stated in the City of Edmonds Ordinance #1711 requiring the installation of backflow prevention devices, the reduced pressure backflow preventor will have to be tested on an annual basis. Attached please find a copy of the report that was completed on -December 27, 1977. We request that this -last discrepancy be corrected within thirty days. If there are any questions regarding this matter, please feel free to contact the Water/Sewer Division at 775-2525, extension 226. Yours very truly, LEIF R. LARSON, P.E. Director of Public Works KKK: j ac Attachment 0 WaterLeadman Dt. W/­S­S_Zpt. Dt NeL Dt. ('00 STREET FILE CITY of EDMONDS e�� Q_i- / �- 200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525 Department of Public Works September 16, 1977 Mr. Merl Beagle Puget Sound College of the Bible 410 4th Avenue North Edmonds, Washington 98020 Dear Mr. Beagle: On May 21, 1977, Ken Kukuk and Lee Willeiksen, Cross - Connection Specialists for the City of Edmonds, 'Conducted a cross -connection inspection of the Edmonds Junior High School. Attached please find (a) a report of deficiencies and corrections required to eliminate potential and/or actual back - flow into the potable water supply. Also attached, please find (b) excerpt from the "Accepted Procedure and Practices in Cross - Connection Manual." which will indicate proper installation procedures;,(c) the April, 1977, copy of the "Approved Cross - Connection Control Devices" accepted by the State of Washington, Department of Social Health Services and the City of Edmonds; and., (d) a copy of the City of Edmonds Ordinance #1711, requiring the installation of backflow prevention devices. If these back - flow prevention devices cannot be obtained or installed within the thirty -day period,' we would appreciate being advised on the probable installation date of each device. Mr. Kukuk will be making final inspection of each backflow preventor or other corrections as they are completed. At the time of inspection, each backflow prevention device will be tested and must meet the specifications for the City regulations. If there are any questions concerning these corrections, please contact the Water/Sewer Division, 775-2525, extension 223 or 226. KKK: j ac Attachments ez,�� 9-14--79 K.K.Kukuk DT. Yours very truly, SIGNED * LEIF R. LARSON, P.E. Director of Public Works 9'- Z 6, - 7 �// t, /7 -7 &r5 Supr. z DT. ec. f ` ' "DT. APO ATTACHMENT "All Boiler for Hot Water Heating System: A reduced pressure backflow preventor is required on the cold water make- up feed line prior to any branching or bypass arrangements. Kitchen: The water line serving the spray hose used for tray cleaning must be equipped with a Watts NLF-9 or Nidel atmospheri c vacuum breaker. /3. Restrooms: All toilets must be equipped with vacuum breakers between the flushometer and the fixture. 4.j Room 1, 2, 3: All sinks equipped with serrated nozzles must be equipped with atmospheric vacuum breakers. E5�.3 Drinking Fountain: All.fountains with a below the flood rim spout must be replaced with a fixture -that provides an air gap separation of at least 1". 14PICAL INSTALt4kTIO'N",-OF DOUBLE CHECK,VALVE ASSEMBLY IN BUILDING 7OR D RY /ICE -24- DEPARTMENT OF SOCIAL AND HEALTH SERV HEALTH SERV10ES DIVISION WATER SUPPLY AND WASTE SECTIONOO RECFivrn Mail Stop 4-1 Olympia, Washington 98504 Telephone: (206) 753-0171 (206) 75373466 7P porms It .. vt. APRIL, 1977 "APPROVED CROSS -CONNECTION CONTROL DEVICES" (Replaces December, 1976 Listing and All Previous Listings) The Rules and Regulations of the State Board of Health regarding Public Water Supplies relating to cross -connection control require the installation of cross - connection control devices under certain conditions (WAC 248-54-470, WAC 248-54-480, WAC 248-54-500). The Regulations require that the devices used for service protection must be approved by the Secretary, Depa I rtment of Social and Health Services. Effective July, 1971, the Department of Social and Health Services approves only those devices which have satisfactorily passed an approved testing program. Questions concerning the testing program should be directed to this office. This list will be updated periodically as new devices are approved. Devices most are underlined. Reduced Pressure Principle Devices (RPPD) Double Check Valve Assemblies (DCVA) COMPANY MODEL SIZE COMPANY MODEL SIZE BADGER No. One 3/411, 111, 1 1/411, BEECO VC. 2", 3", 4" 1 1/2",' 211. F-72 2", 3", 411, 61- BEECO #6 2", 2 1/2", 311, 4", 6." FDC 3/41' 8", 10" #6C 119, 1 1/.2t!, 211, 2 1/2" CLA-VAL D 1", 2;', 2 1/211, 3-1, 4", 6", 8", 311, 41t, 61;, 8fl, 101t 101. #10 1", 1 1/4", 211, 311, 41' #10L 2tl FEBCO 805 3/4", 1", 1 1/2", 2", 3", 4" #12 3/411 #14 3/4", 1", 1. 1/211, 2" GRINNELL B-1 411, 611, 811 2 1/2", 3", 41;, 6" B-2 4", 611, 811, 10" FRP 3/4", ill HERSEY #1 2", 3". 4", 6", 1 814, loll CLA-VAL RP 2", 2 l/ 2", 411, 6';, 8" 1011 NEPTU14E 550 3/4", 111, 1 1/4", RP-1 2", 2 1/211, 3", 4", 6-1 1 1/2", 211 811, 10" RICHWELL DC 3/4", 1", 1 1/4", i i / 211 2 t:-- RP-2 3/4", 1", 1 1/4", 1 1/211 SMR DHC I " ? CRAIIELINE A 1", 1 1/2". 2", 2 1/2", TORO 9-2780 11; 3", 41;, 6-1, 8", 101, 30-0060 3/4" FEBCO 825 1 1/2", 2", 2 1/2", 3" 9-2930 211 4-1, 6", 811 80-0070 1 1/2" NEPTUNE 575 3/4", 1", 1 1/4', 1 1/211, 211 NOTE: A detector check made of two RAINBIRD RP 3/4", Ill, 1 1/4", 1 1/2" approved DCVA's in parallel will 211 be considered adequate backflow protection on a fire line re- RICH14ELL BF 3/4", 111, 1 1/411, 1 1/2", quiring a DCVA. 2" ROCKWELL 701 411 TORO 9-2770 ill 9­2929 211 30-0059 3/41? 80-0069 1 1/2" 14ATTS 900 3/4", 1", 1 1/4", 1 1/211 06 ORDINANCE NO. 1711 A14 ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING CHAPTER 6.16 OF THE.EDMONDS CITY CODE, DECLARING CROSS CONNECTIONS WHICH ENDANGER WATER QUALITY UN LAWFUL AND REQUIRING THE INSTALLATION OF BACKFLOW PREVENTION DEVICES; REQUIRING PRIVATE WATER SUPPLY SYSTEMS TO CONFORM WITH APPLICABLE ORDINANCES OF THE CITY OF EDMONDS; ADOPTING STATE STANDARDS FOR WATER SUPPLIES AND CROSS CONNECTION. CONTROL REGULATION; DECLARING EXISTING UNLAWFUL CROSS CONNECTIONS TO BE PUBLIC NUISANCES AND PRESCRIBING A PROCEDURE FOR ABATEMENT OF SAID NUISANCES. WHEREAS, the City Council of the City of Edmonds, Washington, has determined that certain cross connections in the public water supply pose a potential hazard to water quality within said city, and WHEREAS, the installation of backflow prevention devices to counteract back pressure or prevent back siphonage into the public water system are necessary for the public health, welfare and safety, now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS.: Section 1. Chapter 6.16 of the Edmonds City Code is hereby amended by adding to said chapter, the following sections: Section 6.16.200 Definitions: 1. Backflow: A flow, other than the intended direc- tion of flow, of any foreign liquids, ga§es, or substances into the distribution system of a public water supply. -2. Backflow Prevention Device: A device approved by the State of Washington, Department of Social and Health Services'or such other state depart- ment as shall have jurisdiction over the subject matter, and by the American Water Works Association, used to counteract back pressure or prevent back siphonage into the distribution system of a public water supply. 3. Cross -Connection: Any physical arrangement whereby a public water supply is connected, directly or indirectly, with any other water supply system, sewer, drain, conduit, pool, storage reservoir, plumbing fixture, or other device which contains or may contain contaminated waterr sewage? or other wastes or liquids of unknown or unsafe quality, which may be capable of imparting contamination to a public water supply as a result of backflow. Section 6.16.210 Cross -Connections Declared Unlawful: The installation or maintenance of a cross-conH-eEtion, which in the opinion of the Mayorls.Administrative Assistant or any staff member that lie shall designate who is qualified in protection of municipal water quality, will endanger the water quality of the potable water supply of the City of Edmonds, is hereby declared to be unlawful. Section 6.16.220 Backflow P2�evention Devices to be Installed: Backflow prevention devices, when required to be alled in the opinion of the Mayor's Adminis- trative Assistant or his designated representative shall be installed and maintained by the service customer on any service connection to the City of Edmonds water supply system where said backflow prevention devices are necessary for the protection of the City of Edmonds water supply. Section 6.16.230 Regulation of Private Water Supplies: Use or operation of a private water supply system, contrary to the provisions of the ordinances of the City of Edmonds, or the Laws of the State of Washington or the rules and regulations of the State Board of - Health regarding public water supplies where said private system is served by the City public water supply are hereby declared to be unlawful. Section 6.16.240 Adoption of State -Regulations: Rules and regulations of the State Board of Health re-garding public water supplies-, entitled "Cross -Connection Control Regulation in Washington State" WAC 248-54-250 through WAC 248-54-500, and the American Water Works Association, Pacific Northwest Section's Second Edition of "Accepted Procedure and Practice in Cross -Connection Manual" as they presently exist and as they may, from time to time, be amended in the future, are hereby adopted by this reference as if set forth in full. Section 6.16.250 Abatement of Unlawful Cross -Connections and Installation of Backflow Prevention Devices -- Procedures: Cross -connections declared in tKi-schapter I 140 00 to be unlawful whether presently existing or herein- after installed and/or services requiring backflow . prevention devices and/or unlawful use or operation* of a private water supply system served by the City public water supply system are hereby declared to be public nuisances, and in addition,to any other pro- visions of the Edmonds City Code or the ordinances of the City of Edmonds where abatement of public nuisances, shall be subjed't to abatement in accordance with the following procedure: 1. In the event that the M.A.A. or his designee determines that a nuisance as herein provided does exist, written notice shall be sent to the person in whose name the.water service is established -under the records of the City of Edmonds Water Department, or alternatively, a copy of such written notice shall be posted on the premises served. 2. The notice shall provide that the nuisance described herein shall be corrected within thirty days (30) of the date said notice is mailed or posted on the premises. 3. In the event said nuisance is not abated within the prescribed time, water service to said premises shall be discontinued. 4. In the event that the nuisance, in the*opinion of the M.A.A., or his designated representative, presents an immediate danger of contamination to the public water supply, service from the City water supply system to the premises may be terminated without prior notice, provided, however, notice will be posted on the premises in the manner heretofore provided at the time said service is terminated. Section'6.16.260 Penalties: In addition to the remedies set forth herein, any person found.guilty of violating any of the provisions of this chapter shall be subject to the penalties as set forth in Section 5.12.170 of the Edmonds City Code. APPROVED: * A MAYOR .ATTEST: CITY CLERK Passed by the City Council: May 21, 1974 Filed'with the City Clerk: April 18, 1974 Published: May 29, 1974 iblic' instruction By Bill Sheets Enterprise editor EDMONDS — Puget Sound Christ- ian College, which has called Edmonds home since 1977, will move just across the city line into Mountlake Terrace. The college, which put its current campus at 410 Fourth Ave. N. in down- town Edmonds up for sale a year ago, will move to the former Lake Ballinger Elementary School at 6911 226th Pl. SW. in August. Puget Sound Christian :Teeling , - - their Way-:..', Braille trail will Fron'trunners Warrior b6�s, girls Win-in'track '' .be.speuced up. Page 29 Page 19 ENTERPRISE CLASSIFJEDS Pullout section 0 move to Terrace College President Allan Dunbar The college has received numerous ;0 'for the current. property - so �p announced the upcoming move at the suitors took it off the mar- 0 college's graduation ceremony May 5. numerous thAt PSCC 00 .The former Lake Ballinger school ket until the college was able to find a and accompanying 10 acres have,been new location for itselfi Luce said. Now, owned by the Sun Health organization the property. will -be put back on the for the past decade or so and occupied market in a -formal bidding process until last year, said Bill Luce, director of beginning in June, he said. development at PSCC. Most of the prospective buyers have The college is buying the land and proposed turning the five -story college existing facilities for $1.8 million in what building into upscale condominiums, Luce described as a "bankruptcy fire Luce said, with one bid reaching in sale." V "See,PSCC, Page 14,,.,. - ing out to all ages in. ,the Edmonds community. � - Third, Pine be . ing repaved 3 The Washington State ii Department of Transporta- r- tion (WSDOT) is adminis- 's tering an asphalt overlay of i, Third Avenue from Main d Street to Pine Street, and Pine Street from Third )0 Avenue to Highway 104. m Work was scheduled to ,a- begin May 7 and end June ie 11. All operations are con- �- tingent upon weather condi- e tions, which could affect the �r- beginning and. completion r of construction. Temporary traffic delays ee may occur during the pro- 1i: ject. Construction crews -will e implement traffic control st measures to assure that b- continued vehicle access is maintainedi,et during con- struction, single lane clo- sures will occur from 7 a.rn ' to 4 p.m., Monday through Thursday, and 7 a.m. until I p.m. on Fridays. Parking oil the street will not be allowed in the vicinity of the work. Informational barri- cades will , be posted to advise of specific dates and locations of parking restric- tions. WSDOT inspectors will be on site during con- struction to address specific needs, such as access to dri- veways, that may arise.dur- ing construction, . For more information contact Pat McCormick, WSDOT Project Engineer, or his staff at 206-368-4493. Both WSDOT and the city of Edmonds apologize for any inconvenience that this work may cause to daily activities. Recycling works! re adin, :3 Directory Ad in the ,e Directory F ou AH This.... ge and update your rtise your special ?en every week by ise the format that get . I MCC Continued from page I excess of $7 million. Most of these scenarios would likely involve gutting the auditori- um — which has served as a location for community events — and converting it into residences or associated space, lie said. 'Me other offer received was from a company interest- ed in turning the property into a destination resort, Luce said. ne building is listed on the state Register of Historic Places. The, original, brick part of the PSCC building was constructed in 1909 as Edmonds High School, the first high school between Seattle and Everett. It was expanded in 1921 and the gym and auditorium were added in 1939 under the aus- pices of the Works Progress Administration, in the "art moderne" style characteristic of the 1930s. The building served as the city's high school until 1958 and as Edmonds Junior High School until 1975. Puget Sound Christian College moved to the location in 1977 after operating for 27 years at three locations in Seattle. The PSCC auditorium has served as a venue for the Olympic- Ballet Theatre and the now -defunct Cascade Symphony Orchestra. . Me college plans to require that the downtown Edmonds buildings and audi- torium, per terms of sale, be kept open for a year for rentals and lease, Luce said. While the city of Edmonds has right of first refusal, it would have to match the highest bid, he said. The college decided to move after merging with two other small, non -denomina- tional Christian colleges, Pacific Christian College in Fullerton, Calif. and Min- nesota Bible College in Min- neapolis. Puget Sound Chris- tian will expand its curricu- lum and offer masters, torate and research pro- grams beyond its current undergraduate courses. The college expects to expand its student body from 250 to 700 in the next few years and eventually to 5,000. Ile merged entity will adopt the name of Hope International University, or "Hi U." Each of the colleges will maintain its own branch and name, but will be part of the university as well, accord- ing to Luce. Puget Sound Christian had a long-term goal of stay- ing in Edmonds, ideally on the hillside portion of what is now the Unocal tank farm, Luce said. But that site car- ried "too many unknowns, , he said. Last fall, PSCC offi- cials began negotiating with Sun Health, he said. The new location will still be in the. community, he pointed out. 'Ile city line is right on the edge of this property," he said. The 10 acres, plus some open adjacent property, offers the college the oppor- tunity for expansion, Luce said, compared to the two acres of the current campus. The college will at first use only the former school, which bad been remodeled by Sun Health first into a cen- ter for head -injury patients and then into a center for troubled youth, according to Luce. The eventual plan calls for a new gymnasium and dormitories to be built on the hillside along the eastern edge of the property. A large grass field on the north end will be converted into a foot- ball -soccer field, Luce said. Concerns about traffic and parking were raised at com- munity 'meetings. The col- lege's response was that PSCC will provid ' e on -site c %, parking, its traffi will be spread throughout the day and it will create less of an effect than Sun Health before it, Luce said. fOR [LEAH BIR Sponsors Wanted. Corporate * Individual AMERICAN LUNG ASSOCIATION@ t email: climb4cleanair@yahoo.com Forinforall 20GA98-9590 & Mailing Adflwss i% UAW do Ron S1111d PO Box 144, Lpinwood, WA 98016 DATE RECEIVED I PERMITEXPIRES USE PERMIT CITY OF EDMONDS ZONE NUMBER Z2�!� CONSTRUCTION PERMIT APPLICATION OB SUITE/APT# ADDRESS fiz5e__ L OWNER NAMEMAME OF BUSINESS EDMotN/j),TfVb1-IC FACIwIJE7T PIST)',10- PLAT NAME/SUBDIVISION NO. LOT NO. LID NO. MAILING ADDRESS NJ I)( cfJ Z_ LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approve RW Permit Raq'udired CITY ZIP TELEPHONE EXISTING — _**1 PROPOSED Street Use Permit Req'd Inspection Required Sidewalk Required 13 F,-DM,0WPS <3,0 ?_ 0 1 0-V - T7 5 77 2.�t REQUIRED DEDICATION FT Underground Pring required, NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIREff LMN ARC1iTT_:-cF5 11121, Immufj I YES 13 NO C] cc REMARKS W z z ADDRESS 1910 f 5 E F, - OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE I CITY ZIP J'�/AlTa 8'10 TELEPHONE -2 0L - 0 2- 0 NAME CBL# �'EL 64, --- 1� BY ADDRE ss�-'27 ENG_1rE9_RI;G REVIEWED DAJE Ile W�5Vict Mfl, *f4#, R 0-1-11y"111; Fit) - 60Y, 917 0 \`�I, Y D BY( DATE W CITY zl�� TELEPHONE STATE LICENSE NUMBER EXPIRATION,'DAT.E,�. CHECKED BY', 'VIA ANCE oILC 1;,SHO�ELINE Cf��oS INSPEC TION f REQ'D BOND POSTED 72 tic), 0 ES ONO $ A R SEPA REVIEWW- :,'COMPLETIE ;', - EXEMPT`.," �SIGN AREA 4" .'ALLOWED.-, PROPOSED HEIGHT ��ALLOWED PROPOSED PROPERTY TAX ACCOUNT'PARCELjNO. 17 0 3 7- 0/0 -Z_ 0 T: 1'� ov EXP F1 NEW RESibENTIAL Mr rPLUMSIN�)Poe&��' -LOT.COVERAGE; ALLOWED RtSQ)RED�SETSACKS (FT.) FRO_hl�, SIPE REAR PROPOSED SETBACKS (FT.) FRONT LJR SIDE REAR COMPLIANCE OR PROPOSED 60�nmc, DDITION eCOMMERCIAL CHANGEOFUSE AlTgdvt-� 3YW J-M,577 &e-L, C�rREMODEL E3 - MULTIFAMILY C3 S IGN PARKING;V - REO'D PRC 6ED LOT, AREA',� ly hANNIING REVIEWEb1dV DATE z I 3 GRADING - FENCE--. REPAIR CYOS FT) REMARKS DEMOLISH OTANK OTHER11". GARAGE RETAMING �ALL, FIRE SPRINKLER - CARPORT ROCKE ) KL-fAl g., FIRE ALARM [Er 'P(, w4m_ 7_,!:)o T:� Ei A�-_ n c) f ­4 PA 5 b,,W (TYPE OF USE. BUSINESS QR-ACTIV" EXPLAIN: t-4- TYPE 0 CHECI(Ep BY' F CONSTRUCTION. . CODEi OCCUPANT ijr J3, �MA& GRO NUMBER NUMBER OF CRITICAL _a OF 2- [DWELLING AREAS SPECIAL INSPECTION, OCCUPA14T ST RIES UNITS j NUMBER REOUIREDA YES' JAREA Aa I -7 r"; 3 9_5 LOAD ;?_1 0�; DESCRIBE WORK TO BE DONE It REMARKS F\�:A,0\160N PROGRESS INSPEC71ONS PER UBC108/IBC109'/IRC109 FINAL INSPECTION REEG LP Ll- Lvic .7r(06 VMM& 9 0' AVD 0N A VALUATION E_�il)g244 $ 77M, ALHAII., A5­402db?� DescrIption I --N� escription FEE HEAT SOURCE ,GLAZING% %tCZMjJ 6 'LOf'SLOPE % A� llt:�e ',,,�,Bullding Pp�rmit City Surcharge PLAN CHECK NO- VESTED DATE ��01umbikg-' Base Fee Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO I= 2 BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBUC Grading 3 DOMAIN (CURDS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE 1= SEPARATE PERMISSION. Engr. Review W PERMIT APPILICATION: ISODAYS IL PERMIT UMI1'1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE BACK OF PINK PERMIT FOR MORE INFORMATION 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Fire Review Plan Chk. Deposit IN INTEREST, AGREES TO INDEMNIFX DEFEND AND HOLD HARMLESS THE CITY OF 'i"', _r05 I 2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Inspection Me Rlaceipt # ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY FROM THE ISSUANCE OF THIS PERMIT ISSUANCE OF THIS PERMIT SHALL NOT BE DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Landscapelnsp. Total Amt. Due X01 NOR LIMIT IN ANY WAY THE CITYS ABILITY TO ENFORCE ANY ORDINANCE PROVISION." I Recording Fee I Receipt # I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT, AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- CALL This application is not a permit until signed by the TION; AND IN DOING THE WORK AUTHORIZED THEREBY. NO PERSON WILL BE EMPLOYED Building Official or his/her Deputy: and Fees are paid, and IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FORINSPEC TION receipt Is acknowledged in space provided. WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. anip __ SIGNATUREI (OWNER OR CG&Tf DATE SIGNED (425) 0 )IMAT ATE I 771-0220 RELVaED BY fAf-E A17ENTION EXT 1333 �//, /0 ITIS UNLAWFULTO USE OR OCCUPYABUILDING OR STRUCTURE UNTILAFINAL INSPECTION HAS BEEN MADE AND APPROVALOR A CERTIFICATE OF OCCU- OF PANCY HAS BEEN GRANTED. UBC109/IBC110/IRC110. ORIGINAL -FILE - YELLON- INSPEOO(OR PINK -OWNER - GOLD -ASSESSOR nq/n.,4 .. . __ ­.. . __ a. . ­­ . Permit No Citv of Edmonds A. Address or Vicinity of Construction:4 (0 1417 (Avt- N B. Type of Work,(be specific): �l U 11 VNI C. Contractor: _-5 e'z1_4g!;V Mailing Address: State License J-74 1JV City Business License #: D- Building Permit # (if applicable) d779 Phone: Liability Insurance: Bond: $ Side Sewer Permit # (if applicible): E. F-1 Commercial El Subdivision City Project F V ] EUC (PUD, VERIZON, PSE, COMCAST, OVWSD) El Multi -Family El Single Family Other INSPECTOR: F. PAVEMENTCUT: CIYES El NO G. SIZE OF CUT x CONCRETE CUT: F1 YES El NO G. F] Mail Approved Permit F� Call for Pickup APPLICANT TO READ AND SIGN 4 "t INDEMNITY: Applicant understands by his/her signature to"'this application helshe holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK., ESTIMA TED RESTORA TION FEES WILL BE HELD UNTIL THE FINAL STREET PA TCH IS COMPLETED B Y CITY FORCES, A T WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. + Traffic, control and public safety shall be in accordance with City regulations as required by the City Engineer. Every .Aagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required train.ing in their p6'ssession. + Restoration is to \ be in accordance with City codes. All street -cut trench work, shall be patched with asphalt or City - approved material,prior to the end of the workday — NO EXCEPTIONS. * Three sets of construction drawinis ofiproposed work are required with the permit appl-kation. CALL DIAL -A -DIG (1 1800-424-5555) PRIOR TO BEGINNING WORK I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNO WLEDGE THAT I MUS�MAKE THE PINK THE PERMITAVAILABLE ON SITE A TALL TIMES FOR INSPECTIONS Date: 9 2 - C' 16 �60�tractor or Ag, nt), T' ) , ''. va, AA_ lt�L Of w" U e d REQUIRED INSPECTIONS: Call 425- 771-0220,. Ext. 1326for a 24-hour voice -recorded -insnection-request line. F I I NAL APPROVAL OF PERMITTED WORK: DATE. - I* ctor's Signature CADocurnents and Settings\CunisNy Documents\Fonm\Engnrng\ROWpermit_.doc Rcvised 10/01/03 , . j�. � I— i� . .1 C�_ PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY LOCATION 410 4th Ave N Edmonds, WA 98020 South County ARE POLE NO. NW 1/4S 24 T 27 R 03 DATE 5/27/05 W.O. NO. 346996-03 REASON FOR WORK Install and rerriove temp ENGINEER Kdkalev TASK 346996-09 pole ar�d 3-phase bank for DRAFTER U.C. NO. Sellen 290kW SCALE nts DATE WORK COMPLETED APPROVED & DATE PRINTED FOREMAN FEES REQ'D 0 YES 0 NO PRIMARY OVERHEAD • RESIDENTIAL • COMMERCIAL LEO NO. I es .=$ SECONDARY OVERHEAD BASIC FEE S METER/CONV.POLE PRIMARY UNDERGROUND • RESIDENTIAL • COMMERCIAL BASIC FEE S LEU NO. @S SECONDARY UNDERGROUND BASIC FEE S @S 1=8 UNDERGROUND PLAT BASIC FEE S (L FT.0 I=$ STREET LIGHTING q- FT.0 WORK IN RIGHT OF WAY 0 PRIMARY 0 SECONDARY �q_ FT.0 MISCELLANEOUS FEES VAULT S PERMIT S -job cost 6488.0 S TOTAL DUE S 6488.00 DATE PAID RECEPT NO. SERVICE ORDER NO. LEGEND: ENVIR6NMENTAL ANALYSIS N EXEMPT 0 NOT EXEMPT PARA. 18 ITEM C= O.H. U.G. COND. KV ADD CKT. FT. PH REM CKT. FT. PH NET CKT. FT. O.H. U.G. COND. KV ADD CKT. FT.-- rN REM CKT. FT. PH NET CKT.FT. PERMITS (DATE GRANTED) 0 TREE TRIM 0 STATE 0 COUNTY E CITY 0 EASEMENTS 0 REQUIRED E NOT REQUIRED DATE RELEASED FOREIGN CONTRACTS • VERIZON JPN NO. • CATV JPN NO. 0 JOINT TRENCH VERIZON & CATV 0 JOINT BORE VERIZON & CATV 0 .POLE STENCILING FROM . TO TAKE OFF POLE PRE-CONST. REQUIRMENTS 0 TREE TRIM 0 PUD LOCATOR * BACKHOE 0 FLAGGING * ONE CALL DATE No. on f orm READY PHASING GIS WORKING 1 LINE FINISHED POLE/ XFMR IJOINT USE [7LOCATION MAP PAGE 454F-5 0 EXISTING POLE X EXISTING POLE -TO BE REMOVED * NEW POLE X NEW POLE TO REPLACE EXISTING POLE DATE SUBSTATION 5 Corners CIRCUIT NO. 12-1283 PHASE 123 ENGR'S TEL. * F425-670-3214 I ENGR'S PAGER * 11425-787-752:31� BLOW-UP 0 F AK A curb _j LIJ Set 45" pole 45' S of stop':91gh at SE corner of Td,sk 03 Frame per Const. Assemblies 12F301 and 12F601 Hong 150kVA( 3 0 50kVA 277/480V 3-phase xf Mr - bank per Const. Std. 4-13-9.0 Dist 50- Ser Dist 50- Ser Dist 50- Ser Voltage Tnsk w intersection I Run - 80' of 4/0 Al quad-plex to customer's temp meter pole Rmv 150kVA Dist 50- Ser Dist 50- Ser Dist 50- Ser Rmv 80'of Strip and 277/480V 3-phase xfmr bank 4/0 Al quad-plex from pole to meter pole rmv 45' pole and restore planter stri SL-2439-D 50-5304. 2-117 FU65 2-IG5854 VAULT ROOM U2 50-7GI2 0 50-5324 . A-4432 E mw =__ at q2 20-20-20102 e *1A PUGET-SOUND CHRISTIAN Z customer's temp meter pole -P W Glen St )�D HANG/ RN 50- 50- 50-- SHEET 1 OF 1 C cn CL E 0 r- Cn 02 LO 00 ;:T .:� r� December 2000 Page 611-41 Figure 611-18. Lane Closure on Minor Street (TA-18) 1: 800 Tables 6H-2 and 61-1-3 for the meaning of the sYmbols-andfor letter codes used In this figure. le(optlonal]l Aed Aftenualor (optional) Buffer Space (optional) ft) max. Typical Application 18 Sm. 61tol Page I of I Darryll Nestor To: Scott Bastiani Subject: Street Closures 1. Storm outfall - 4th Ave. NW corner. 6' deep excavation. Signage both ways on 3rd Ave. Signage on 4th Ave. per Edmonds TCP Figure 6H-18 ( TA - 18 ). One lane closure at a time. 12/05 timing.. 5 day duration. 2. H20 Assembly @ SW Daley St.. Caution signage on 4th. Daley St. signage per Edmonds TCP Figure 6H - 18 (TA - 18 ). One lane closure. 12/05 timing. 8 day duration. 3. H20 Assembly @ 6th Ave. & Glen St. NE corner. Caution Signage on 6th and Glen ST.. Glen St. & 6th Ave. signage per Edmonds TCP Figure 6H - 27 ( TA - 27 ). 3/06 timing. 10 day duration. DarTyll Nestor Superintendent SeRen Construction Company w. www.sellen.com t. 206.805.7171 f. 206.521.9288 c. 206.786.2523 e. daMllnestor@sellen.com 8/31/2005 11141 Mil 3 C'�-LL 6on(l(!(!f + -1 ZZ 3 �)Lx�ct o,o- Law— C-1 /5"' 0 + L i rl \1 I N 7 6 6 �s ck� -Lb q + 7 6 6 zz� 0 0 0 0 4 6 \\X %01 "so . . . . . . . . . . . . JJ GENERAL 3TE NOTES 1. NOTE AT TRAILER AREA THAT DURING PAVING RELOCATION MAY BE NECESSARY. TIMING PAVING WILL OCCUR AROUND 07/06. 2, MAIN ACCESS TO AND FROM SITE VIA 6TH AVE ACCESS. 3, THE DELIVERY ROUTE SHALL BE SR104 TO DAYTON STREET TO 6TH AVE S, TO GLEN STREET, TO THE SITE, AND RETURN THE SAME ROUTE. EXISTING INFORM,AT21\1 SIGNAd---"� UeM DA Lg�; ST MUSIC BUILDING ( TA- 2:7) �tzc:) 1-,A I f � L EACYI-Dlz�S LC'�' N 01 10 SITE CONSTRUCTION COORDINATION PLAN [s� r) Q1 1 7,), A P' SCALE: UNKNOWN APPHOVED ASNOTED ----BY. EN"EER'Il'G;--, A QMM� - - /I 1240,v- Date: r"Z, 6TH �VE. Avull I lq�� LEGEND PROPERTY LINE SETBACK05 EXISTING TO BE REMOVED (AS NOTED) CONSTRUCTION FENCE INFORMATION SIGNAGE CLOSED SIDEWALK RESUB AUG 3 12005 BUILDING DEPARTMENI CITY OF EDMONDS STREET FILE 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 98104 206.682.3460 FAX 343.9388 EDMONDS CENTER FOR THE ARTS 1�-F-10 - 2-77) PROJECT SITE SETUP FROM 2/30/05 THRU 9/12/06 REGISTERED ARCHITECT �TATE OF WASHINGTON REVISIONS NO DATE BY DESCRIPTION TITLE SITE CONSTRUCTION COORDINATION PLAN DESIGNED DN' DRAWN GC CHECKED DATE 07/24/05 CADD FILE SEL002 JOB NUMBER SEL002 AUG 3 12005 SWIDMG DEPART ENT Clr 'r OF EDMOlVMDS STREET FILE STORM DRAINAGE CALCULATIONS For Edmonds Center For The Arts Located in Edmonds, Washington �Vj�� BUSH, ROED & FUTCHINGS, INC. 2009 Minor Avenue East Seattle, Washington 98102-3513 phone: (206) 323-4144 fax: (206) 323-7135 contact: Brent Cummings, P.E. BRH Job No. 2003019.01 Date: June 29, 2005 Revised: August 30, 200.5 RESUB AUG g 12005 BUILDING DEPARTMENT cITY OF EDMONDS NEW-P.-M F - -1 STORM DRAINAGE CALCULATIONS For Edmonds Center For The Arts Located in Edmonds,, Washington BUSH, ROED & FUTCHINGS, INC. 2009 Minor A�enue East Seattle, Washington 98102-3513 phone: (206) 323-4144 fax: (206) 323-7135 contact: Brent Cummings, P.E. BRH Job No. 2003019.01 Date: June 29, 2005 Revised: August 30, 2005 FRESUR AJ6 3 12005 BUILDING DEPARIMENT CITY OF EDMONDS STREET FILE a PROJECT LOCATION: Pro*ect Overview Narrative Ci Biookme!e-St st Caspers S.t. Giftnet Ln Vista Pi Oountain Aloha Way Aloha St W EF Glen St 81h Ave N < d; Daley St z spra" St r t4monds St.: Ben St main SOF W Dayton St Li se Dayton St. Park.' Mahle st: M) > W Aide! St Beek Ln :(A > Walnut St Holly Dr C.Pdxr R1 M PROJECT DESCRIPTION: The proposed site is located north of Daley Street between 4'h Avenue North and 6 1h Avenue North in downtown Edmonds. Presently the site is fully developed with a 56,622 sq.ft. multi- story masonry building and associated paved parking and landscape areas. The project proposes to demolish approximately 23,700 sq. ft. of the north half of the existing building and the construction of a paved parking lot in its place with access to both 4h and 6h Avenues. A 2,970 sq. ft. addition is also proposed on the north side of the remaining structure. A new stormwater. detention and water quality system will serve the new structure and parking lot as well as the existing 0. 15 acre parking lot in the northeast comer of the property. The south portion of the site will remain unchanged with the exception of improvements to an existing concrete pedestrian path on the west side of the existing building as well as new water and sanitary sewer service for the proposed 2,970 sq. ft. addition and the existing buildings. NORTH LOT _q kar. :7, 1WPCL15TfRe Ap, 6. 50 t -64 50 I �IDil 40 -64.40 -64.75 -69.15 01. A F'oop ul �k I ao �64,90 64.75. 64.25 -64.40 BUILDING -TO BE -64.55 64�55 DEMOLISHED Tc PREDEVELOPMIN FN� r�oc�. t..L Y�01E FLOWPATH 64.20 ir 371 FT 6010 - 61 99 .64M ;A . 66 771 .8.90, m ;k670 .6 70 14 ih 6'tw 56 3' 46.80 L NEW ADDITION MAIN, L(J T -j�*_jdj 71 LOCATION P-7 NUI 61164 < v4' 68.50 Tc PREDEVELOPMENT Sheet Flow: 150' el. 71.0 el. 68.6 =150' @ 1.6% EXISTING AREAS: W DE� Shallow Flow: 159' el. 68.6 — el. 58.0 =159' @ 6.7% NORTH LOT BYPASS�. Shallow Flow: 61' el. 58.0 el. 49.6 6,554 SF TOTAL =61' @ 13.8% 5,675 SIF IMPERVIOUS, 879 SF PERVIOUS MAIN LOT: 45,960 SF TOTAL ijVorc: 45,960 SF PERVIOUS 0 SF IMPERVIOUS-1 NEW ADDITION LOCATION- 2,970 SIF TOTAL 0 SF IMPERVIOU Flo�15S� FL­ S i j: :J. T; lit I FLWP A', 16" DEC T �'T bh, JOB NO 2003019 KALE 1'=50*' DPAWN P mc A CHECI��El, BDC [,ATE s"_117J/0 BUSH, RCIED & HITCHINGS, INC. PREDEVELOPMENT (__,�(DNDITION CIVIL ENGINEERS & LAND CURVEYORS --E[,JTEP FOR, THE 'ARTS S T, 2009 MINOR AVE. EA I SEATTLE, WA 911iru? (206) 323-4144 FAX (206) 323­71Y5 EDMOMDS WASHINGTON 1-800--_935-0508 E—MAIL. INF0@13PHINIC COM C) A NORTH LOT 1% Ile -7- 77 64 7 �Ek P 3PIG, RA 'upt 4" lb x A A % j 0 ---n NEW ADDITION LOCATION MAII) 'LOT ' I - !'M r-t--s. �l P E L PROPOSED AREAS NORTH LOT BYPASS: ti 6,554 SF TOTAL 5,675 SF IMPERVIOUS 879 SF PERVIOUS MAIN LOT: 45,960 SF TOTAL 30,876 SIF IMPERVIOUSi 15,084 SF PERVIOUS d. NEW ADDITION: 2,970 SF v t. 613ct,- JOB [110 2003019 S (' AL E I "= 50 DRAWN I'mc D-ALEY---,STREE'T , CHECKED BDC 1, -,8 , n, [,a TE BUSH, ROED & HITCHINGS,, INC. PROPOSED CONDITION AREA EXHIBIT CIVIL ENGINEERS & LAND SURVEYORS EDMONDS (--.E[\JTER FOR THE ARTS 2009 MINOR AVE. EAST, SEATTLE, WA 98102 (206) 3-2-3-4144 FA'- (206) 7'7,--7135 1-800-935-0508 E—MAIL- lNF(-)16-)BRHlN(-- (-'(-)M EDK40NJDS WASHINCTO113 ID A (' �- E)GSTING DRAINAGE: Existing stormwater runoff from the area of new construction predominantly flows west toward 4 th Avenue North. Approximately 0. 16 acre of impervious area in the 1.27 acre site is collected at either a catchbasin located in the north lot (see Predevelopment Condition exhibit) or in the gutter of 6th Avenue North. Runoff to the west is allowed to sheet flow to the 4 th Avenue North gutter. Gutter flow in 4th Avenue North heads north until reaching the catchbasin at the intersection of 3rd and 0, - Avenues. This catchbasin drains to the 15" storm drain located in 3 rd Avenue North. The 3 rd Avenue North stormdrain then continues to Caspers Street and flows east before reaching oLitfall at Shell Creek. Collected runoff to the east is conveyed to the 12" storm drain in 6 1h Avenue North before eventually reaching outfall at Shell Creek and then to Puget Sound.. Stormwater from the southern portion of the property is also collected in the gutters of 4h and 6 1h Avenues similarly to the north portion of the property. Additional runoff is picked up along the south edge of the property by a catchbasin at the comer of Daley Street and 4th Avenue and conveyed to the 12" storm drain in the south side of Daley Street. PROPOSED DRAINAGE: All runoff from the new structure and parking areas will be collected by a new drainage system consisting of catchbasins, a roof drain and a trench drain. This area is noted in the Proposed Condition Area Exhibit as the Main Lot. Additional flows from the area noted in the exhibit as the North Lot will also be collected. Stormwater will be conveyed to a CSR Stormcept6r 2400 for water quality treatment and then to an on -site detention facility. The detention facility outlet will then convey flows to a new catchbasin in 4h Avenue and finally to the existing 15" storm drain in 3 rd Avenue. The detention facility will handle 1.27 acres. Surface runoff from the new pedestrian path to the west side of the remaining Center for the Arts structure will sheet flow to a through -port gutter located to the west of the pedestrian path. The gutter will be integral to a seatwall design proposed by the architect. The through -port gutter will be fabricated with I I" long openings every six feet of the gutter's length in order to allow unconcentrated flow of stormwater to pass through the seatwall and onto the grass area west of the path. By doing this, we intend to most accurately reproduce the existing flow patterns in this area. All other areas in the south of the property have existing drainage patterns that keep runoff separate from the proposed stormwater system. See the Predevelopment Condition figure for existing topography. Existing stormwater systems and drainage patterns in areas to the east and south of the pedestrian path will remain undisturbed and unchanged from their current condition. Criteria for the design of the proposed detention facility is as follows - Per agreement with Don Flene of the City of Edmonds Engineering Division, predeveloped land cover was assumed to be meadow in all areas except for the north parking lot located in the northeast comer of the property. Land cover input for the SBUH analysis for predevelopment conditions was therefore 1. 14 acres of meadow and 0. 13 acre of impervious. Under proposed conditions, land cover in disturbed areas included 0.91 acre of impervious and 0.37 acre open space. Hydrologic soil group classification of (C) was assumed for this analysis. Pervious areas were modeled with curve numbers (CN) of 85 corresponding to meadow for predevelopment conditions and 86 corresponding to open space. for proposed conditions. Impervious areas were modeled with a curve number of 98 in all cases. Time of concentration, T, of 35.85 minutes is used for,watershed modeling purposes in predevelopment and 6 minutes is used in proposed conditions. See Storm Drainage Calculations section for the determination of T.. The 24 hour rainfall depths are from the. Stormwater Management Manual for the Puget Sound Basin isopluvial maps: 50% of 2- year 24 hour storm 0.99 inches 2- year 24 hour storm 1.5 inches 10- year 24 hour storm 2.0 inches 100- year 24 hour storm 3.0 inches Hydrographs were produced using the SCS Type IA storm. Detention volume and drainage flow control were determined with Santa Barbara Urban Hydrograph methodology. The following is a summary of our analysis results. Pages 7 through 15 of the attached Storm Drainage Calculations show our results for peak flow rates.for 50% of the 2, 10 and 100 year events as well as the hydrographs for each event over the 1.27 acre site under existing conditions. Summary of hydrograph data for each event under are shown on Page 9 with peak flows as given below: 50% of 2- year 24 hour storm 0.023 cfs 10- year 24 hour storm 0.151 cfs 100- year 24 hour storm 0.322 cfs Analyzed vault dimensions are given in Stage Storage Table on page 16 as 33 feet by 18 feet. The Stage Discharge Table on page 18-gives discharge for orifice sized to 0.56 inches at elevation 46.00. Design details and stage discharge for weir are provided on page 18 with the combined stage discharge for orifice and weir provided on page 19. Page 20 shows the Level N Pool Table Summary with vault outflow matching peak runoff rates for each event as shown above and in the Hydrograph Summary on page 9. PROPOSED WATER QUALITY TREATMENT - The water quality design storm, 6-month, 24-hour event, was calculated as 64% of the 2-year, 24-hour storm event per the Stormwater Management Manual for the Puget Sound Basin isopluvial maps: 6-month, 24-hour event = 64% x 1. 5 inches = 0. 96 inches Peak flow for the 6-month event was calculated as 0. 18 cfs. See Storm Drainage Calculations. Based on the peak flow requirements of 0, 18efs and the 90% annual flow treatment requirement the CSR In -line Stormceptor 2400 was selected for this water quality application. Expected performance for this system includes: * Max. Flowrate Treatment = 1.06 cfs 80% TSS Removal for 1.65 acres of impervious area Greater than 90% treatment of annual flow for this project's 0.91 acre of impervious area See excerpts from the CSR Technical Manual included in the Storm Drainage Calculations for manufacturer performance specifications. EROSION & SEDIMENTATION CONTROL: Erosion control will consist of silt fences along the edge of the site abutting public right-of-way. The fence will be placed behind the back of curb or, in the case of an attached sidewalk, behind the back of walk. Inlet protection, consisting of filter fabric, gravel filters and/or straw bale barrier shall be used for all existing and proposed inlets until disturbed areas are paved or landscaping is established. The contractor is required to use vehicle-� tracking control where vehicles enter and exit the site from public right-of-way. The contractor shall keep the right-of- way clean of all construction debris. If these measures are taken and monitored by the city no impact should be felt to the downstream system during and after construction. Also, two Baker Tanks will be used to settle out sediment laden runoff prior to being discharged 6om the site. See the Erosion Control Plan for details. The design criteria for sizing the tanks will be per the section on Sediment Traps in the 1992 D.O.E. Stormwater Management Manual for the Puget Sound Basin. The volume is the detention volume required for the 2-year, 24-hqK design storm (see Sediment Facility sizing, page 28. Storm Drainage Calculations STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN I I rw OR BIG EL 21 I )f;o Is 26 �"%ZqR ( 20 c,,- 45 Y.) I n Q N �\\V, < 50� — - \ 5 4 ;1,- 3$ C �11 S 2b 45 S AT 40� 3 35 20 -V 3 45 3 , 40 35 COMA 42 3 AB RDE N 30 zn5 25 3 13 CENT 20 10 YAKi 30 20 45' 40-1— M 35 3 ADA—/ H 3 55 45, 1A 3 25 WASHINGTON 8 K RA>L 1 0 0 10 20 30 40 - E N E — — — MILES 20 —2 15 0 Figure 25 NOAA ATLAS 2, Volume IX ISOPLUVIALS F 2-YR 24-HR PRECIPITATI N IN Prepared by U.S. Department of c( mm rce TENTHS OF A INCH National oceanic and Atmospheric A Iministration National weather Service. Office of Hydrology Prepared for U.S. Department of All ricuiture Soil Conservation service, Engineer 39 Division 124 12i— 122 121 111-1-44 FEBRUMiy, 1-992 70 80., 4 8 IL 75� 75 80 90\, 1 OT 90 47�-- STORMWATER MANAGEMENT MANUAL FOR THE.PUGET SOUND BASIN 124 1�3 122 45 45 2 — AlUlggp ' 42�' 45 A Q 55 Q Z_J\-- r H A R1 T A —N 11MOF-111lu I U11 10 0 10 20 30 40 MILES 40 Figure 30 ISOPLUVIALS F L100-YR 24-HR PRECIPIT4TION 4 I IN TENTHS OF N INCH 124 123 uceanic and Atmospheric Ajjr National Weather Service ' Of1i - 0 f;H ;7Pr pared for U.S. De - -ent ;'f A ii .1 Conservation Sepr,',irrte. Engineer 1 122 . 12i !2 940 41� 111-1-46 FEBRUARY, 1992 4 STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN Table 111-1.3 SCS Western Washington Runoff Curve Numbers (Published by sCS in 1982) Runoff curve numbers for selected agricultural, suburban and urban lAnd iiam fe%v- P"� in U LAND USE DESCRIPTION CURVE NUMBERS BY HYDROLOGIC SOIL GROUP A B C D Cultivated land(l): winter condition 86 91 94 95 Mountain open areas: low growing bru sh & grasslands 74 82 89 92 Meadow or pasture:' 1 65 78 R 89 Wood or forest land: undisturbed 42 64 76 81 Wood or forest land: young second growth or brush 55 72 81 86 Orchard: . - 'with cover crop 81 88 92 94 pen spaces" lawns, parks, golf co urses, cemeteries, .landscaping: Good condition: grass cover on �:75% of the 68 80 90 area Fair condition: grass cover on 50-75% of 77 85 90 92 the area Gravel roads & parking lots: 76 85 89 91 Dirt roads & parking lots: 72 82 87 69 Impervious surfaces, pavement, roofs etc. 98 98 e=*N W 98 Open water bodies: lakes, wetlands, ponds etc. 100. 100 100 100' Single family re sidential(2): Dwelling Unit/Gross Acre %Impervious(3) Separate curve number 1.0 DU/GA is shall be selected for 1.5 DU/GA 20 pervious & impervious .2.0 DU/GA 25 portions of t-he site 2.5 DU/GA 30 or basin 3.0 DU/GA 34 3.5 DU/GA 38 4.0 DU/GA 42 4.5 DU/GA 46 5.0 DU/GA 48 5.5 DU/GA so 6.0 DU/GA- 52 6.5 DU/GA 54 7.0 DU/GA 56 PUD's, condos, apartments, %impervious commercial businesses & must be industrial areas computed (1) For a more detailed description of agricultural land.use curve numbers refer to National Engineering Handbook, Sec. 4, Hydrology, Chapter 9, August 1972. (2) Assumes roof and driveway runoff is directed.into street/storm system. (3) The remaining pervious areas (lawn) are considered to be in good condition for these curve numbers. 111-1-12 FEBRUARY, 1992 ,5- BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 Minor Avenue East Seattle, WA 98102 (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 JOB * sno So le-1 SHEET NO. I — OF CALCULATED BY CHECKED BY Qr'.Al r 4,r DATE DATE FRUE11,111 204-1 (Single Sheets) 205-1 (Padded) BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 Minor Avenue East Seattle, WA 98102 (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 ' PRODUCT 204-1 (Single Sheets) 205-1 (Padded) JOB SHEET NO. — CALCULATED BY CHECKED BY — SCALE OF DATE DATE BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 Minor Avenue East Seattle, WA 98102 (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 JOB Zc>c> 30NCI SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE .qr.Al F C -r0c, S-.rc) I(L Y-) )0 (4, A� C'7 CL�­ CIA C., S A'1z:e."4 Tc� -r-LI S -T I L k— tj0yz'_7*v.� tj-r A 12 L-,, P t-1 (�?ew 0 L-k S e*�A, Oit�UeGUF�1�19 cw-v.� r') yz 0 1 2)7ci .5 v- z 15S 4- Ayte-A tj&w L-Y oe;- 'A-: '6\ 4 /A r- f- a7r' 6UA_i-_11Lc- c .0 Tl 0 "'�'j 0 ou_�)� f�D' S ip 1) ao (9 0 C"e Q ,4 Y5 1"o (:f K.) Z ��jb 0 60 a T-A 4-b,1 3 b 173 -roTAL 0 YZ 0e76�Xr"'Ok-> 51t)NL" f�uyz e_k !ST i PG� CO.W 0 T 1.0 9 ?-1 d. N ell S A YZ1E )4-3 PO 0,T H 07 A, 04 c, cw U �-k b r 0., OZ ?xo.) b.7,c, K) e6o PN rz 1c, f, Q("\ L_ S A. 10 r6uo-I)jQ(�', A-VY)ITI LK�rT b. U-) F r r 0,77-7. c C)b+ 5r- Pt7007­0" ev 4z�' �L� t) 4, z; 7-1 ro 'W) 7 PRODUCT 204.1 Gnale Shtelsi 205 1 nddmi b/30/05 12:39:28 am . Bush, Roed & Hitchings, Inc page 1 .Edmonds Center for the Arts Detention Vault Calculations Revised.per City Review BASIN SUMMARY BASIN ID: dev10-2 NAME: Developed 10yr SBUH METHODOLOGY TOTAL AREA ........ : 1.27 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV IMP PRECIPITATION .... : 2.00 inches AREA..: 0.37 Acres 0.91 Acres TIME INTERVAL .... : 10.00 min CN.... 86.00 98.00 TC.....: 6.00 min 6.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.43 cfs VOL: 0.16 Ac-ft TIME: 480 min BASIN ID: dev100-2 NAME: Developed 100yr SBUH METHODOLOGY TOTAL AREA ........ : 1.27 Ac res BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV IMP PRECIPITATION .... : 3.00 inches AREA..: 0.37 Acres 0.91 Acres TIMEINTERVAL .... : 10.00 min CN .... : 86.00 98.00 TC .... : 6.00 min 6.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.70 cfs VOL: 0.26 Ac-ft TIME: 480 min BASIN ID: dev2-2 NAME: Developed 2yr SBUH METHODOLOGY. TOTA-L AREA ....... : 1.27 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : tYPE1A PERV * IMP PRECIPITATION .... : 1.50 inches AREA..: 0.37 Acres 0.91 Acres TIME INTERVAL .... : 10.00 min CN .... : 86.00 98.00 TC .... : 6.00 min 6.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.30 cfs VOL: 0.11 Ac-ft TIME: 480 min BASIN ID: ex10-2 NAME: Existing 10yr SBUH METHODOLOGY, TOTAL AREA ....... : 1.27 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV IMP PRECIPITATION .... : 2.00 inches AREA..: 1.14 Acres 0.13 Acres TIME INTERVAL .... : 10.00 min CN .... : 85.00 98.00 TC .... : 35.85 min 35.85 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.15 cfs VOL: 0.09 Ac-ft TIME: 490 min I 8/30/05 12:39:28 am Bush, Roed & Hitchings, Inc page 2 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review BASIN SUMMARY BASIN ID: ex100-2 NAME: Existing 100yr SBUH METHODOLOGY TOTAL AREA ....... : 1.27 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV PRECIPITATION .... : 3.00 inches AREA..: 1.14 Acres TIME INTERVAL .... : 10.00 min CN .... : 85.00 TC .... : 35.85 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.32 cfs VOL: 0.18 Ac-ft TIME: 490 min BASIN ID: ex2-2 NAME: Existing 1/2-2yr SBUH METHODOLOGY TOTAL AREA ....... : 1.27 Acres BASEFLOWS:. 0.00 cfs RAINFALL TYPE .... : TYPE1A PERV PRECIPITATION .... : 0.99 inches AREA..: 1.14 Acres TIME INTERVAL .... : 10.00 min CN .... : 85.00 TC .... : 35.85 min ABSTRACTION COEFF:' 0.20 TcReach - Sheet L: 150.00 ns:0.2400 p2yr: 1.50 s:0.0160 TcReach - Shallow L: 159.00 ks:3.00 s:0.0670 TcReach - Shallow L: 61.00 ks:3.00 s:0.1380 PEAK RATE: 0.02 cfs VOL: 0.02 Ac-ft TIME: 490 min IMP 0.13 Acres 98.00 35.85 min IMP 0.13 Acres 98.00 35.85 min 1*1 8/30/05 12:39:28 am Bush, Roed & Hitchings, Inc page 3 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review HYDROGRAPH SUMMARY PEAK TIME VOLUME HYD RUNOFF OF OF Contrib NUM RATE PEAK HYDRO Area cfs min. cf\AcFt Acres 1 0.023 490 1070 cf 1.27 2 0.151 490 4136 cf 1.27 3 0.322 490 7896 cf 1.27 11 0.021 1460 2929 cf 1.27, 12 0.081 970 4757 cf 1.27 13 0.362 5�O 9104 cf 1.27 ,20--- -0,129 80,0�- -1-r-3-0 FA I 8/30/05 12:39:29 am Bush, Roed & Hitchings, Inc page 4 1 1 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review DETAIL HYDROGRAPH SUMMARY HYDROGRAPH No. 11 Peak runoff: 0.0212 cfs Total Vol: 0.07 ac-ft TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF (min) (Cfs) (min) (Cfs) (min) (cfs) (min) (cfs) (min) (Cfs) 10 410 0.0086 810 0.0183 1210 0.,0205 1610 0.0207 20 420 0.0088 820 0.0184 1220 0.0205 1620 0.0207 30 430 0.0091 830 0.0184 1230 0.0206 1630 0.0206 40 440 0.0094 840 0.0185 1240 0.0206 1640 0.0206 50 450 0.0098 850 0.0186 1250 0.0206 1650 0.0206 60 460 0.0104 860 0.0186 1260 0.0207 1660 0.0205 70 470 0.0110 870 0.0187 1270 0.0207 1670 0.0205 80 480 0.0118 880 0.0188 1280 0.0207 1680 0.0204 90 490 0.0126 890 0.0189 1290 0.0208 1690 0.0204 100 500 0.0133 900 0.0189 1300 0.0208 1700 0 .0204 110 0.0001 510 0.0138 910 0.0190 1310 0.0209 1710 0.0203 120 0.0002 520 0.0141 920 0.0191 1320 0.0209 1720 0.0203 130 0,0004 530 0.0144 930 0.0192, 1330 0.0209 1730 0.0203 140 0,0007 540 0.0147 940 0.0192 1340 0.0210 1740 0.0202 150 0 ' 0010 550 0.0150 950 0.0193 1350 0.0210 1750 0.0202 160 0.0015 560 0.0152 960 0,0194 1360 0.0210 1760 0.0202 170 0.0019 570 0.0154 970 0.0195 1370 0.0211 1770 0,0201 180 0.0024 580 0.01�6 980 0.0195 1380 0.0211 1780 0.0201 190 0.0028 590 0.0157 990 0.0196 1390 0.0211 1790 0.0200 200 0.0030� 600 0.0159 1000 0.0196 1400 0.0211 1800 0.0200 210 0.0033 610 0.0161 1010 0,0196 1410 0.0211 1810 0.0200 220 0.0035 620 0.0162 1020 0.0196 1420 0,0212 1820 0.0199 230 0.0038 630 0.0164 1030 0.0197 1430 0.0212 1830 0.0199 240 0.0040 640 0.0165 1040, 0.0197 1440 0.0212 1840 0.0199 250 0.0043 650 0.0167 1050 0.0197 1450 0.0212 1850 0.0198 260 0.0045 660 0.0168 1060 0.0198 1460 0.0212 1860 0.0198 270 0.0047 670 0.0169 1070 0.0199 1470 0.0212 1870 0.0197 280 0.0050 680 0.0171 1080 0.0199 1480 0.0212 1880 0.0197 290 0.0052 690 0.0172 1090 0.0200 1490 0.0212 1890 0.0197 300 0.0055 700 0.0173 1100 0.0200 1500 0.0211 1900 0.0'196 310 0.0057 710 0.0174 1110 0.0201 1510 0.0211 1910 0.0196 320 0.0059 720 0.0175 1120 0.0201 1520 0.0210 1920 0.0196 336 0.0062 730 0,0176 1130 0.0202 1530 0.0210 1930 0.0195 340 0.0066 740 0.0177 1140 0,0202 1540 0.0210 1940 0.0195 350 0.0069 750 0.0178 1150 0.0202 1550 0.0209 1950 0.0194 360 0.0072 760 0.0179 1160 0.0203 1560 0,0209 1960 0.0194 370 0.0075 - 770 0.0180 1170 0.0203 1570 0.0209 1970 0.0194 380 0.0078 780 0.0181 1180 0.0204 1580 0.0208 1980 0.0193 390 0.0081 790 0.0182 1190 0,0204 1590 0.0208 1990 0.0193 400 0.0083 800 0.0182 1200 0.0204 1600 0.0207 2000 0,0193 a 8/30/05 1-2:39:29 am Bush, Roed & Hitchings, Inc page 5 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review DETAIL HYDROGRAPH SUMMARY HYDROGRAPH No. 11 Peak runoff: 0.0212 cfs Total Vol: 0.07 ac-ft TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF. RUNOFF (min) (cfs) (min) (cfs) (min) , (cfs) (min) (cfs) (min) (Cfs) 2010 0.0192 2210 0.0185 2410 0.0177 -------------- 2610 0.0170 2810 0.0162 2020 0.0192 2220 0,0184 2420 0.0177 2620 0.0169 2820 0.0162 2030 0.0191 2230 0.0184 2430 0.0177 2630 0.0169 2830 0,0162 2040 0.0191 2240 0.0184 2440 0.0176 H40 0.0169 2840 0.0161 2050 0.0191 2250, 0.0183 2450 0.0176 2650 0.0168 2950 0.0161 2060 0.0190 2260 0.0183 2460 0.0175 2660 0.0168 2860 0.0161 2070 0.0190 2270 0.0183 2470 0.6175 2670 0.0168 2870 0.0160 2080 0.0190 2280 0.0182 2480 0.0175 2680 0.0167 2880 0.0160 2090 . 0.0199 2290 0.0182 2490 0,0174 2690 0.0167 2890 0.0159 2100 0.0189 2300 0.0181 2500 0.0174 2700 0.0166 2900 0.0159 2110 0.0188 2310 0.0181 2510 0.0174 2710 0.0166 2910 0.0159 2120 0.0188 2320 0.0181 2520 0.0173 2720 0.0166 2920 0.0158 2130 0.0188 2330 0.0180 2530 0.0173 2730 0.0165 2930 0.0158 2140 0.0187 2340 0.0180 2540 0.0172 2740 0.0165 2940 0.0158 2150 0.0187 2350 0.0180 2550 0.0172 2750 0.0165 2950 0.0157 2160 0.0187 2360 0.0179 2560 0.0172 2760 0.0164 2960 0.0157 2170 0.0186 2370 0.0179 2570 0.0171 2770 0.0164 2970 0.0156 2180 0.0186 2380 0.0178 2580 0,0171 2780 0.0164 2980 0.0156 2190 0.0185 2390 0.0178 2590 0.0171 2790 0.0163 2990 0.0156, 2200 0.0185 2400 0.0178 2600 0,0170 2800 0.0163 3000 0.0155 2210 0.0185 2410 0.0177 2610 0.0170 2810 0.0162 8/30/05 12:39:29 am Bush, Roed & Hitchings, Inc page 6 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review DETAIL HYDROGRAPH SUMMARY HYDROGRAPH No. 12 Peak runoff: 0.0810 cfs Total Vol: 0.11 ac-ft TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF �min) (cfs) (min) (cf s) (min) (cfs) (min) (cfs) (min) (cfs) 10 410 0.0108 810 0.0402 1210 0.0584 1610 0.0218 20 420 0.0111 820 0.0478 1220 0.0587 1620 0.0217 30 430 0,0114 830 0.0556 1230 0.0588 1630 0.0217 40 440 0.0118 840 0.0676 1240 0.0585 1640 0.0217 50 450 0.0123 850 0.0684 1250 0.0588 1650 0.0216 60 460 0.0129 860 0.0709 1260 0.0589 1660 0.0216 70 470 0.0137 870 0.0763 1270 0.0586 1670 0.0215 80 480 0.0146 880 0.0798 1280 0.0589 1680 0.0215 90 490 0.0156 890 0.0801 1290 0.0590 1690 0 .0215 100 0.0003 500 0.0164 900 0.0802 1300 0.0587 1700 0.0214 110 0.0005 510 0.0170 910 0.0806 1310 0.0590 1710 0.0214 120 0.0009 520 0.0174 920 0.0804 1320 0.0591 1720 0.0214 130 0.0013 530 0.0177 930 0.0804 1330 0,0588 1730 0.0213 140 0.0019 540 0.0180 940 0.0808 1340 0.0564 1740 0.0213 150 0.0025 550 0.0184 950 0.0906 1350 0.0520 1750 0.0212 160 0.0029 560 0.0186 960 0.0807 1360 0,0509 1760 0.0212 170 0.0033 570 0.0189. 970 0.0810 1370 0.0499 1770 0.0212 180 0,0036 580 0.0191 980 0.0735 1380 0,0492 1780 0.0211 190 0 .0040 590 0.0193 990 0.0576, 1390 0 .0487 1790 0 .0211 200 0.0043 600 0.0195 1000 0.0511 1400 0.0483 1800 0.0211 210 0.0046 610 0.0197 1010 0.0498 1410 0.0480 1810 0.0210 220 0.0049 620 0.0198 1020 0.0489 1420 0.0479 1820 0.0210 230 0.0052 630 0.0200 1030 0.0483 1430 0.0478 1830 0.0209 240 0.0055 640 0,0202 1040 0.0492 1440 0.0476 1840 0.0209 250 0.0057 650 0.0204 1050 0.0540 1450 0.0476 1850 0.0209 260 0.0060 660 0.0205 1060 0.0681 1460 0.0447 1860 0.0208 270 0.0063 670 0.0207 1070 0.0696 1470 0.0366 1870 0.0208 280 0.0066 680 0.0208 1080 0.0698 1480 0.0273 1880 0.0208 290 0.0068 690 0.0210 1090 0.0699 1490 0.0222 1890 0.0207 300 0.0071 700 0.0211 1100 0.0675 1500 0.0222 1900 0.0207 310 0.0074 710 0.0212 1110 0.0622 1510 0.0221 1910 0.0206 320 0.0077 720 0.0213 1120 0.0587 1520 0.0221 1920 0.0206 330 0.0080 730 0.0215 1130 0.0674 1530 0.0221 1930 0.0206 340 0.0084 740 0.0216 1140 0.0689 1540 0.0220 1940 0.0205 350 0.0088 750 0.0217 1150 0.0519 1550 0.0220 1950 0.0205 360 0.0092 760 0.0218 1160 0.0509 1560 0.0220 1960 0.0205 370 0.0095 770 0.0219 1170 0.0538 1570 0.0219 1970 0.0204 380 0.0099 780 0.0220 1180 0.0580 1580 0,0219 1980 0,0204 390 0.0102 790 0.0222 1190 0.0586 1590 0.0218 1990 0.0204 400 0.0105 800 0.0277 1200 0.0587 1600 0.0218 2000 0.0203 � 2. 8/30/05 112:39:29 am Bush, Roed & Hitchings, Inc page 7 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review DETAIL HYDROGRAPH SUMMARY HYDROGRAPH No. 12 Peak runoff: 0.0810 cfs Total Vol: 0.11 ac-ft TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF (min) (cf s) (min) (cfs) (min) (cf s) (min) W s) (min) Ws) 2010 0.0203 2210 0.0195 2410 0.0188 2610 0.0180 2810 0.0173 2020 0.0202 2220 0.0195 2420 0.0187 2620 0.0180 2820 0.0173 2030 0.0202 2230 0.0195 2430 0.0187 2630 0.0180 2830 0.0172 2040 0.0202 2240 0.0194 2440 0.0187 2640 0.0179 2840 0.0172 2050 0.0201 2250 0.0194 2450 0.0186 2650 0.0179 2850 0.0171 2060 0.0201 2260 0.0193 2460 0.0186 2660 O.Oi79 2860 0.0171 2070 0.0201 2270 0.0193 2470 0.0186 2670 0.0178 2870 0,0171 2080 0.0200 2290 0.0193 2480 0.0185 2680 0.0178 2880 0.0170 2090 0.0200 2290 0.0192 2490 0.0185 2690 0.0177 2890 0.0170 2100 0.0199 2300 0.0192 2500 0.0185 2700 0.0177 2900 0.0170 2110 0.0199 2310 0.0192 2510 0.0184 ' 2710 0.0177 2910 0.0169 2120 0.0199 2320 0.0191 2520 0.0184 2720 0.0176 2920 0.0169 2130 0 .0198 2330 0,0191 2530 0 .0183 2730 0 .0176 2930 0.0168 2140 0.0198 2340 0.0190 2540 0.0183 2740 0.0176 2940 0.0168 2150 0.0198 2350 0.0190 2550 0.0183 2750 0.0175 2950 0.0168 2160 0.0197 2360 0.0190 2560 0.0182 2760 0.0175 2960 0.0167 2170 0 .0197 2370 0.0189 2570 0.0182 2770 0.0174 2970 0.0167 2180 0.0196 2380 0.0189 2580 0.0182 2780 0.0174 2980 0.0167 2190 0.0196 2390 0.0189 2590 0.0181 2790 0.0174 2990 0.0166 2200 0.0196 2400 0.0188 2600 0.0181 2800 0.0173 3000 0.0166 2210 0.0195 2410 0.0188 2610 0.0180 2810 0.0173 17-1 8/30/05 12:39:29 am . Bush, Roed & Hitchings, Inc page 8 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review DETAIL HYDROGRAPH SUMMARY HYDROGRAPH No. 13 Peak runoff: 0.3024 cfs Total Vol: 0.21 ac-ft TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF (min) (Cfs) (min) (Cfs) (min) (cfs) (min) (cfs) (min) (Cfs) 10 410 0.0147 810 0,1194 -------------- 1210 ========= 0.0911 ==== 1610 = ====== 0.0218 20 420 0.0151 820 0.1092 1220 0.0915 1620 0.0218 30 430 0.0154 830 0 .1078 1230 0.0916 1630 0.0217 40 440 0.0159 840 0.1077 1240 0.0912 1640 0.0217 50 450 0.0166 850 0.1077 1250 0.0916 1650 0.0216 60 460 0.0174 860 0.1114 1260 0.0917 1660 0.0216 70 470 0.0183 870 0.1199 1270 0.0913 1670 0.0216 80 0.0003 480 0.0194 880 0,1254 1280 0.0917 1680 0.0215 90 0.0007 490 0.0206 890 0.1258 1290 0.0918 1690 0.0215 100 0.0014 500 0.0217 900 0.1259 1300 0.0914 1700 0.0215 110 0.0022 510 0.0428 910 0.1265 1310 0.0918 1710 0.0214 120 0.0029 520 0,2912 920 0,1262 1320 0.0919 1720 0.0214 130 0.0033 530 0.3024 930 0.1262 1330 0.0914 1730 0.0213 140, 0 .0038 540 0.2796 940 0.1267 1340 0,0877 1740 0.0213 150 0.0042 550 0.2755 950 0.1264 1350 0.0796 1750 0.0213 160 0.0047 560 0.2518 960 0.1264 1360 0.0746 1760 0.0212 170 0.0052 570 0.2115 970 0.1270 1370 0.0735 1770 0.0212 180 0.0056 580 0.1941 980 0.1151 1380 0.073 3 1780 0.0212 190 0.0060 590 0.1917 990 0.0902 1390 0.0738 1790 0.0211 200 0.0064 600 0.1918 1000 0.0753 1400 0.0734 1800 0.0211 210 0.0068 610 0.1917 1010 0.0727 1410 0.0733 1810 0.0210 220 0.0072 620 0.1885 1020 0.0724 1420 0.0738 1820 0.0210 230 0.0075 630 0.1811 1030 0.0729 1430 0.0734 1830 0.0210 240 0.0078 640 0.1766 1040 0.0803 1440 0.0734 1840 0.0209 250 0.0082 650 0.1758 1050 0.0968 1450 0.0739 1850 0.0209 260 0.0085 660 0.1759 1060 0.1073 1460 0.0580 1860 0.0209 270 0.0089 670 0,1766 1070 0.1088 1470 0.0443 1870 0.0208 280 0.0092 680 0.1693 1080 0.1091 1480 0.0332 1880 0.0208 290 0.0096 690 0.1530 1090 0.1091 1490 0.0245 1890 0.0207 300 0.0100 700 0.1430 1100 0.1055 1500 0,0222 1900 0.0207 310 0.0103 710 0.1421 1110 0,0971 1510 0.0222 1910 0.0207 320 0.0107 720 0.1422 1120 0.0916 1520 0.0221 1920 0.0206 330 0.0111 730 0.1418 1130 0.1052 1530 0.0221 1930 0,0206 340 0.0116 740 0.1424 1140 0.1074 1540 0.0220 1940 0.0206 350 0.0121 750 0.1426 1150 0.0794 1550 0.0220 1950 0.0205 360 0.0126 760 0.1423 1160 0.0755 1560 0.0220 1960 0.0205 370 0.0130 770 0.1428 1170 0.0890 1570 0.0219 1970 0.0204 380 0.0135 780 0.1430 1180 0.0907 1580 0.0219 1980 0.0204 390 0.0139 790 0,1427 1190 0.0914 1590 0.0219 1990 L0204 400 0.0143 800 0.1355 1200 0.0915 1600 0.02 18 2000 0.0203 a 8/30/05 12:39:29 am Bush, Roed & Hitchings, Inc page 9 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review DETAIL HYDROGRAPH SUMMARY HYDROGRAPH No. 13 Peak runoff: 0.3024 cfs Total Vol: 0.21 ac-ft TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN TIME DESIGN RUNOFF RUNOFF RUNOFF RUNOFF RUNOFF (min) (Cfs) (min) WS) (min) WS) (min) (Cfs) (min) WS) 2010 0.0203 2210 0.0196 2410 0.0188 2610 0.0181 2810 0,0173 2020 0.0203 2220 0.0195 2420 0.0188 2620 0.0180 2820 0.0173 2030 0.0202 2230 0,0195 2430 0.0187 2630 0.0180 2830 0,0172 2040 0.0202 2240 0.0194 2440 0.0187 2640 0.0180 2840 0.0172 2050 0,0202 2250 0.0194 2450 0.0187 2650 0.0179 2850 0.0172 2060 0.0201 2260 0.0194 2460 0.0186 2660 0.0179 2860 0.0171 2070 0.0201 2270 0.0193 , 2470 ' 0.0186 2670 0.0178 2870 0.0171 2080 0.0200 2290 0.0193 2480 0.0185 2680 0.0178 2880 0.0171 2090 0.0200 2290 0.0193 2490 0.0185 2690 0.0178 2890 0.0170 2100 0.0200 2300 0.0192 2500 0.0185 2700 0.0177 2900 0.0170 2110 0.0199 2310 0.0192 2510 0.0184 2710 0,0177 2910 0,0169 2120 0.0199 2320 0.0191 2520 0.0184 2720 0.0177 2920 0.0169 2130 0.0199 2330 0.0191 2530 0.0184 2730 0.0176 2930 0.0169 2140 0.0198 2340 0.0191 2540 *0.0183 2740 0.0176 2940 0.0168 2150 0.0198 2350 0.0190 2550 0,0183 2750 0.0175 2950 0.0168 2160 0.0197 2360 0.0190 2560 0.0183 2760 0.0175 2960 0.0168 2170 0.0197 2370 0.0190 2570 0.0182 2770 0.0175 2970 0.0167 2190 0.0197 2380 0.0189 2580 0.0182 2780 0.0174 2980 0.0167 2190 0.0196 2390 0.0189 2590 0.0181 2790 0,0174 2990 0.0167 2200 0.0196 2400 0.0188 2600 0.0181 2800 0.0174 3000 0.0166 2210 0.0196 2410 0.0188 2610 0,0181 2810 0.0173 8/30/05 - 12:.39:29 am Bush, Roed & Hitchings, Inc page 10 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review STAGE STORAGE TABLE RECTANGULAR VAULT ID No. vault2 Description: Detention Vault Length: 33.00 ft. Width: 18.00 ft. voids: 1.000 STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > STAGE < ---- STORAGE ---- > (ft) ---Cf --- -- AC -Ft- (f t) --- cf --- -- Ac-Ft- (f t) --- Cf --- -- AC -Ft- (f t) --- Cf--- --AC-Ft- 46.00 0.0000 0.0000 47.80 1069 0.0245 49.60 2138 0.0491 51.40 3208 0.0736 46-10 59.400 0.0014 47.90 1129 0.0259 49.70 2198 0.0505 51.50 3267 0 .0750 46.20 118.80 0,0027 48.00 1188 0.0273 49.80 2257 0.0518 51.60 3326 0.0764 46.30 178.20 0.0041 48.10 1247 0.0286 49.90 2317 0.0532 51.70 3386 0.0777 46.40 237.60 0.0055 48.20 1307 0.0300 50.00 2376 0.0545 51.80 3445 0 .0791 46.50 297.00 0.0068 48.30 1366 0.0314 50.10 2435 0.0559, 51.90 3505 0.0805 46.60 356.40 0.0082 48. 40 1426 0.0327 50.20 2495 0.0573 52.00 3564 0 .0818 46.70 415.80 0.0095 48.50 1485 0.0341 50.30 2554 0,0586 52.10 3623 0.0832 46.80 475.20 0.0109 48.60 1544 0.0355. 50.40 2614 0.0600 52.20 3683 0.0845 46.90 534.60 0.0123 48.70 1604 0.0368 50.50 2673 0.0614 52.30 3742 0.0859 47.00 594.00 0.0136 48.80 1663 0.0382 50.60 2732 0.0627 52.40 3802 0.0873 47.10 653.40 0,0150 48.90 1723 0.0395 50.70 2792 0.0641 52.50 3861 0.0886 47.20 712 .80 0.0164 49.00 1782 0.0409 50.80 2851 0.0655 52.60 3920 0.0900 47.30 772 .20 0.0177 49.10 1841 0 0423 50.90 �911 0.0668 52 .70 3980 0 .0914 47.40 831.60 0.0191 49.20 1901 0.0436 51.00 2970 0.0682 52.BO 4039 0.0927 47.50 891 .00 0,'0205 49.30 1960 0. 0450 51.10 3029 0.0695 52.90 4099 0.0941 47.60 950.40 0.0218 49.40 2020 0.0464 51.20 3089 0.0709 53.00 4158 0.0955 47.70 1010 0.0232 49.50 2079 0.0477 51.30 3148 0,0723 53.00 4158 0.0955 Ell 8/30/05 12:39:29 am Bush, Roed & Hitchings, Inc page Edmonds Center for the Arts Detention Vault Calculations Revised per City Review STAGE DISCHARGE TABLE MULTIPLE ORIFICE ID No. 2orifice Description: orifice Outlet Elev: 46.00 Elev: 46.00 ft Orifice Diameter: 0.5625 in. STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGR --- > (ft) ---cfs -- ------- (f t) --- CfS -- ------- (f t) --- CfS -- ------- (ft) ---cfs -- ------- 46.00 0.0000 47.80 0.0115 49.60 0.0163 51.40 0.0200 46 .10 0.0027 47.90 0.0118 49.70 0.0165 51.50 0.0201 46.20 0.0038 48.00 0.0121 49.80 0.0167 51. 60 0.0203 46.30 0.0047 48.10 0.0124 49.90 0.0170 51.70 0.0205 46.40 0.0054 48.20 0.0127 50.00 0.0172 51.80 0.0207 46.50 0.0061 48.30 0.0130 50.10 0.0174 51.90 0.0209 46.60 0.0067 48.40 0.0133 50.20 0.0176 52.00 0.0210 46.70 0.0072 48.50 0.0136 50.30 0.0178 52.10 0.0212 46.80 0.0077 48.60 0.0138 50.40 0.0180 52 .20 0.0214 46.90 0.0081 48.70 0.0141 50.50 0.0182 52.30 0.0216 47.00 0.0086 48.80 0.0144 50.60 0.0184 52.40 0.0217 47.10 0.0090 48.90 0.0146 50.70 0.0186 52 .50 0.0219 47.20 0.0094 49.00 0.0149 50.80 0.0188 52.60 0.0221 47.30 0.0098 49.10 0.0151 50.90 0.0190 52.70 0.0222 47.40 0.0102 49.20 0.0154 51.00 0.0192 52.80 0.0224 47.50 0.0105 49.30 0.0156 51.10 0.0194 52 .90 0.0226 ,47.60 0.0109 49.40 0,0158 51.20 0.0196 53 .00 0,0227 47.70 0.0112 49.50 0.0161 51.30 0.0198 8/30/05 12:39:29 am Bush, Roed & Hitchings, Inc page 12 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review STAGE DISCHARGE TABLE COMBINATION DISCHARGE ID No.,combo Description: Combination Discharge Structure: 2orifice Structure: Structure: weir Structure: Structure: STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > (ft) ---cfs -- ------- (f t) --- CfS -- ------- (f t) --- CfS -- ------- (f t) * --- CfS -- ------- 46.00 0.0000 48.10 0.0124 50.20 0.0176 52.30 0.0216 46.10 0.0027 48.20 0.0127 50.30 0.0178 52 .40 0.0217 46.20 0.0038 48..30 0.0130 50.40 0.0180 52 .50 0.0219 46.30 0.0047 48.40 0.0133 50.50 0.0182 52.60 0.0221 46.40 0.0054 48.50 0.0136 50.60 0.0184 52.70 0.0222 46.5 * 0 0.0061 48.60 0.0138 50.70 0.0186 52.80 0.0522 46.60 0.0067 48.70 0.0141 50 .80 0.0188 52 .90 0.2256 46.70 0.0072 48,80 0.0144 50.90 0.0190 53.00 0.5626 46.80 0.0077 48.90 0.0146 51.00 0.0192 53.10 1.0879 46.90 0.0081 49.00 0.0149 51.10 0.0194 53.20 1.8245 47.00 0.0086 49..10 0.0151 51.20 0.0196 53 .30 2.7936 47.10 0.0090 49.20 0.0154 51.30 0.0198 53 .40 4.0147 47.20 0.0094 49.30 0.0156 51.40 0.0200 53 .50 5.5059 47.30 0.0098 49.40 0.0158 51.50 0.0201 53.60 7.2843 47.40 0.0102 49.50 0.0161 51.60 0.0203 53 .70 9.3660 47.50 0.0105 49.60 0.0163 51.70 0.0205 53.80 11.766 47.60 0.0109 49.70 0.0165 51.80 0.0207 53 .90 14.500 47.70 0.0112 49.80 0.0167 51.90 0.0209 54.00. 17.581 47.80 0.0115 49.90 0.0170 52 .00 0.0210 47.90 0.0118 50.00 0.0172 52.10 0.0212 48.00 0.0121 50.10 0.0174 52 .20. 0.0214 I b . 8/30/05 12:39:29 am Bush, Roed & Hitchings, Inc page 13 Edmonds Centerfor the Arts Detention Vault Calculations Revised per City Review OVERFLOW WEIR ID No Description: Weir Ratio (h:lv): 3.2100 El: 52.75 ft. STAGE DISCHARGE TABLE weir Weir length: 0.7000 ft. Weir Increm: 0.10 STAGE <--DISCHARGE --- ) STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > STAGE <--DISCHARGE --- > (ft) ---cfs -- ------- (f t) --- CfS -- ------- (ft) ---cfs -- ------- (f t) --- CfS -- ------- 52.75 0.0000 52.80 0.0299 52.90 0.2030 53.00 0.5399 8/30/05 12:39:35 am Bush, Roed & Hitchings, Inc page 14 Edmonds Center for the Arts Detention Vault Calculations Revised per City Review LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-) OUTFLOW STORAGE < -------- DESCRIPTION --------- > (cfs) (cfs) --id- --id- <-STAGE> A (cfs) VOL (cf) 1/2 2yr dev .................. 0.02 0.30 vaulU combo 52.12 11 0.02 3637.41 cf 10ex 10dev ................... 0.15 0.43 vaulU combo 52.82 12 0.08 4049.07 cf 100ex 100dev ................. 0.32 0.70 vaulU combo 52.92 13 0.30 4112.14 cf 1z 0 SEMON 5.3 DETENTION FACILMES Rectangular, Sharp -Crested Weir The rectangular, sharp -crested weir design shown in Figure 5.3.4.E may be analyzed using standard weir equations for the fully contracted condition. FIGURE 5.3.4.E RECTANGULAR, SHARP -CRESTED WEIR PLAN fffs SECTION NTS riser Q = C (L - 0.2H)H3' (5-6) where Q = flow (cfs) C = 3.27 + 0.40 HIP (ft) H,P are as shown above L = length (ft) of the portion of the riser circumference as necessary not to exceed 50010 of the circumference D = inside riser diameter (ft) Note that this equation accountsfor side contractions by sub tracting 0.]Hfrom Lfor each side of the notch weir. 9/1/98 5-46 1998 Surface Water Design Manual C, 93 Fage I ot 2 Appended on: 16:02:37 Tuesday, June 28, 2005 B-001 Event Summary L-AT&C &opiurl' 5TVILM CALCOL�enof.3 lPeak Q (c lPeak T (hrs])IHyd Vol (ac --]F--YP--i-A F6 --m—o—n —thl 1 0. 17 6 1 8.00 0.0625 F T2866-Ts—BUH T E Record Id: B-001 IDesign Method I UH IFRainfall type IF TYPEIA jHyd Intv 10.00 ing Factor 484.00 lAbstraction Coeff 0.20 --]FlPervious Area 0.37 ac DCU 0.91 ac lPervious CN --]I 86-0-0--IFDC CN IF- 98.00 Fiervious TC 6.00 min DC TC 6.00 min I Pervious CN Cale Description F SubArea Sub c Pervious =F 0.37 ac 86.00 Pervious Composited CN (AMC 2) 86.00�jj Pervious TC Calc Descr F Length F- TT 16.00 min Pervious TC 6.00 ml Directly Connected CN Cale Description [7 SubArea [—Sub cn Impervious =F- 0.91 ac IF 98-oo DC Composited CN (AMC 2) 98.00 Directly Connected TC Cale Description Length TT 16.00 min Direcfly Connected TC =F— 6.00min file:/AL:\Job-nos\2003019\Engineering\Caics\Stormshed.htmI 6/28/2005 1 ZA ZA Technical Manual Page 12 Storniceptor units provide storage capacities (sediment and oil) from 108 ft' to 1000 ft' (Table 3). Table 3 also indicates the maximum treatment flow rate of the various Stormceptor units. These flow rates indicate the threshold when bypassing begins to occur. At flowrates greater than the maximum treatment flowrate, treatment is still provided in the unit at 80% to 90% of the maximum treatment flowrate.(NWRI, 1993). The treatment rate decreases once the unit begins to bypass since the overflow creates a backwater on the outlet pipe (See figure 2, page 6). Table 3 Stormceptor Capacities* Model Maximum Treatment Flowrate (gal/min)* Maximum Treatment Flowrate .(ftl/sec)* Orifice Opening (in.) Sediment Capacity (ft') Oil Capacity (gal) Total Holding Capacity (gal) STC 900 285 0.635 6 75 280 950 STC 1200 285 0.635 6 110 280 123G STC 1800 285 0.635 6 195 280 1830 475 ("1-058-) 8. 180 880 2495 STC 3600 475 1. 58 8 345 880 3750 STC 4800 800 1.782 10 465 1025 5020 STC 6000 800 1.782 10 610 1025 6095 STC 7200 1110 2.473 12 725 1100 7415 * approximate, without by-passing �) cycc6t's 6-M0,-z4-%,L rr.AK- FLvW (9 Ir 0. (6 CF6 Stormceptoil 0 Z.'� Technical Manual Page 16 Based on the performance relationship in Figure 5 (previous page), Table 5 provides rule of thumb drainage area constraints for the Stormceptor models that are manufactured. The STC in the model number refers to the precast concrete version of the Storniceptor. The Storlinceptor System is manufactured under license of CSR Hydro Conduit or its subsidiaries in all states except Colorado, Wyoming, Montana, Idaho, North Dakota, South Dakota and Utah. Table 5 indicates that there'are four design levels, for the Storniceptor. The first three design levels are based on the classification of the receiving waters (river, watercourse). These design levels are for stormwater management plans in which the Storinceptor is the pply stormwater quality measure being implemented. The fourth design level is intended for situations in which the Stormceptor is one of a number of stormwater quality control measures being implemented on a site (i.e. the interceptor discharges to a perforated pipe, sand filter, infiltration trench, etc.) Retrofit designs, in all likelihood, will not be able to meet the design guidelines in Table 5. In these cases, the implementation of the Storniceptor is still applicable since it represents a low cost measure to provide some degree of water quality enhancement (spills protection and bedload removal). Table 5. Maximum Impervious Drainage Area Guidelines (ac) Stormceptor Model (STC) Sensitive Area (80% TSS Removal) Standard Area (70% TSS Removal) Degraded/ Altered Area (60% TSS Removal) Treatment Train (50% TSS Removal) Series 900 0.45 0.55 0.70 0.90 Series 1200 0.70 0.85 1.05 1.45 Series 1800 1.25 1.50 1.90 2.55 Series 2400 1.65 2.00 2.50 3.35 Series 3600 2.60 3.15 3.95 5.30 Series 4800 3.60 4.30 5.40 7.25 Series 6000 4.60 5.55 6.95 9.25 Series 7200 5.55 6.70 8.40 11.25 STC = Precast Concrete Materials of Construction 101/0 Te,5 ewiovk, FoA 0.51 Ae,463 or, jrjr6P-vt-ojS Ae�-A Note: Please contact your local representative for more detailed local sizing information where available. D11 Stormceptor4 Z(O Technical Manual Page 18 Based on API style calculations with 150 um (0.0059 in.) oil globule (rise velocity of 3.47 ft/min.), the oil will rise anywhere from 10 inches to 24 inches during peak flow conditions in the separation chamber depending on the size of unit implemented. These distances are based on the assumption that only half of the storage volume in the interceptor is used in the flow through zone. As such, the calculations and laboratory tests indicate that oil will be readily trapped since the outlet riser is the same elevation as the inlet riser. Flow Treatment A check was made on the sizing criteria provided in Table 5 (page'16) based on modeling which was undertaken by Marshall Macklin Monaghan Limited (MMM, 1994). MMM continuously modeled 4 parking lots with various drainage areas (1.2 ac, 2.5 ac, 7.4 ac, and 12.4 ac). The continuous flow series resulting from these simulations were analyzed to determine the percentage of annual flow volume that by-passed the Stormceptor. It was. assumed that the design treatment flow rate remained the same during by-pass conditions for the determination of the volume of stormwater that by-passed the interceptor (i.e. when a by-pass occurs water which flows over the weir creates a backwater effect on the discharge pipe from the treatment chamber which restricts the flow rate in the treatment chamber to the design value). This is consistent with laboratory tests conducted at the National Water Research Institute (Marsalek, 1994). Table 6 shows the results of the modeled flow analysis. The table indicates that the sizing guidelines provided in Table 5 will result in 80%+ of the annual flow volume being treated by -the Stormceptor. Interceptor sizing for "sensitive area" habitat results in approximately 90% of the annual flow volume being treated by the Stormceptor OV&& qo:/, -ra6kTr%6P-rF 6f, &PjWLArL_ F%-ULj FOM 1K9&1LV%OJS AA-6A OF 0.11 &C-9-6. Table 6. Percentage of Annual Flow Volume Treated by the Stormceptor Impervious Drainage Area (ac) STC 900 STC 1200 STC 1800 STC 3600 STC 4800 STC 6000 STC 7200 1.2 89% 3 �01, 96% 98% 2.5 81% 87% 92% 95% 7.4 61% 72% 81% 85% 12.4 52% 65% 76% 82% The designer must ensure that the unit is also properly sized for the spill potential associated with the site (i.e. fuel truck, bus, cars, etc.). Stormceptoe ZT BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 Minor Avenue East Seattle, WA 98102 (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 PRODUCT iO4-1 (Sinale Sheels) 205-1 (Padded) JOB SHEET NO. OF — CALCULATED BY DATE CHECKED BY SCALF DATE BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 Minor Avenue East Seattle, WA 98102 (206) 323-4144 FAX (206) 323-7135 BRH 1-800-935-0508 JOB SHEET NO. OF.' CALCULATED BY ArL. DATE CHECKED BY U, Co, 4'1 <- volo,,,-c (per DATE rmuumi im, �bmglemecisjzw-i immea) 4 r (r--- L-G TOP VIEW woml PASSENGER VIEW tt<UNI VILW DRIVER VIEW DESCRIPTION 1 1 3 21' MA WAY 2 1 3- 3 1 2' VENT COUPLING WITH PLUG 4 1 4' WELD NE K AND BLIND FLANGE 5 1 8' BLAYLOCK MODEL LLID PRESSURE/VACUUM 6 3 4' BUTTERFLY VALVE FRONT VIEW CLOSEUP The informa n contained herein is proprieto to B or fie . 'y " I ak Torks old hall hot be reprod ... d or 3020 OLD RANCH PARKWAY disclosed in whole or in part, or used for any SPECIFICATIONS: d-ign or manufacture except when user obtains SEAL BEACH, CA 90740-2751 direct written outhorlZation from Baker Torks, 1) TANK CAPACITY: 19,194 GAL (457 BBL.) 2) TANK WEIGHT: 29,500 LBS. SCALE: SIZE ORIGINAL OWG. DAI DO NOT SCALE B 11JUN02 NOTES: E DRAWN BY: JAPPROVED, BY: CAT/CLASS 1. THIS DRAWING IS A BASELINE REPRESENTATION FOR THIS MODEL TANK. VARIATIONS BETWEEN THE D PJB 110-1200 DRAWING AND THE ACTUAL EQUIPMENT IN THE FIELD CAN AND DO EXIST, PRIMARILY NITH APPURTENANCE LOCATIONS, SIZES AND QUANTITIES. CONSULT YOUR LOCAL BAKER REPRESENTATIVE IF SPECIFIC NEEDS EXIST C TITLE ESP MFG, FIXED AXLE TANK SMEE71 OF 1 2. THIS TANK IS TO BE TRANSPORTED WHILE EMPTY ONLY. IT IS NOT DESIGNED TO TRANSPORT LOADS. B (RECESSED STAIRWAY VERSION) 3. MOST TANKS OF THIS TYPE HAVE AN INTERNAL LINING (COATING). I A DRAWING NO. REV. I.REV, I DESCRIPTION DATE 13Y S-2-M0001-1- 0 V13 Technical Information Manual 2.3.1 GENERAL INFORMATION This tank has a srhooth int&.rior Wall for easy cleaning,. WEIGHTS AND MEASURES 457 BBL (19.194 gals.), or Capacity: 471 bbl (19782 gals.) 10'- 31/2" (overall) Height: 9'.2". (tank only) 8 .0" (overall) or, Width: T-51/2" (inside width) 46'0'* (overall) Length: ....... 42'.7" (tank only) Weight: 29.500 lbs CTURAL DESIGN "01 Floor: ....... �'4'* thick ASTM A36 carbon steel Sides/Ends: 114" thick ASTM A36 carbon steel Top Deck: ...... '14" thick ASTM A36 carbon steel 6"x3"x1/4" ASTM A36 formed channel on Wall Frame: ...... 27" centers Horizontal 1 114" ASTM A36 formed channels on 24" Framing: centers InternalCross f None Bracing: ACCESSORIES Manifold: ...... : None Electrical ..... Large 7-pin D.O.T. compliant Plug. Blaylock Model LL10. Buna-N seal. 16 oz. Relief Valve: ....... Pressure setting, 0 4 oz. Vacuum setting Fill Line: 3" sch. 40 pipe with cap & chain Top Manway: ..... 22'1 D min. - flat steel with slotted hinges Front 22AD. min 1/2"flat steel with slotted Manway: hinges Side Manway: 22* I.D. min. - 112" flat steel with slotted ..... : i hinges '01 Manway Buna-N (thermally fused to tank) Seals: 3/4"xl"x22" ...... Non -slip w/handrails & guardrails; OSHA Stairway: compliant. (three layc�uts) ESPM FIXED AXLE TANK (SMOOTH -WALL LODI VERSION) ACCESSORIES - cont. (2)Front & (I)Rear: Bray Series 30, 4"- wafer butterfly valve. Cast iron body, Valves: Buna-N seat & seals, 316 SS stem, Nylon 11 coated ductile iron disk, with plug and chain. Rear Drain: ...... 4­ 150# FNPT flange Front Drain: ..... 4"-150# FNPT flange Main Rails ..... C I 2x2O 7 ASTM A36 steel channel Level Gauge: Ball float style, 2 8*'SS float-, Tires: ...... ; I 1 00 x 22 5 Nylon tubeless Stan ciard 22,500#, automatic slack adjusters, cast drum and hub, 30 service Axles: ....... chambers, outboard drums (Rockwell 5" O.D x X." wall x 71.5" track wl oil seals) Suspension: ..... Reyco 3 spring 22,500 lb Capacity Brakes: ..... Air brake system SURFACE DETAILS Primer Carboline 890 Polyamide epoxy, Exterior ...... color C703 Coating: Paint* Carboline 1 34HS Polyurethane, co-lor #.B756,Baker Warm Gray Interior. ...... I Primer: Carboline 187, color 0500 Brick Coating: Red Carboline@ Rustarmor 139 (safety Safety Paint: ..... yellow) - handraifs, hatch covers and trip hazard surfaces Equipment DW####SDL 6" numbers, front & rear Number: (DW = Double Wall, SDL = Safety Vapor Lined, #### = tank sequence number) 2-bCLB: Property of Baker Tanks ... 1 -DCLD01: Danger -Do Not Enter ... I DCLD03. Danger ..Confined Space Decals: ..... I -DCLD04- Danger.Surface Slick 2-DCLE: Baker Tanks Rentals 1-DCLIC01 Warning. Coat Damage 1 - DCLW04 Warning -Do Not Move o, Placard Front and rear, as needed. minimum Mounts: 48'*x48** T . E . STS^/6ERTIFICATIO . N S Test ...... .... - Hydrostatic water test after construction Performed: and major repairs, Level 1. 11 and III inspections on a scheduled basis To the best of our knowledge the technical data contained herein are true and accurate at the date of issuance and are subject to change without prior notice. No guarantee of accuracy is given or implied because variations can and do exist. NO WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY BAKER TANKS, EITHER EXPRESS OR IMPLIED. 3020 OLD RANCH PARKWAY - SUITE 220 e SEAL BEACH, CA e 562-430-6262 a �'.v 6 6,3 -Ivl( TED AP i VE P, Z G Y EN01, EEN ON, 38LF-6*SS 01.45% D, te: : --,.I co - f sit J- 3VONDMILE S y 72 71 X DEC FI-41c,4 FLOOR 10 9 1 STA 2+7 6 6" CLEAP40UT PARCEL A TE-68 0 IE=63 54 3+08.75 --J . . . . . . . STA MULTI STORY N 6" CLEANOUT— MASONRY BUILDING rE=68.0 �6 2 C IE=64 14 1 3 52.156 SO FT. J-- N STA 2+20.08 6; CLEANOUT =67.0 2 JAIv I IE=62Z5 TA NOTE, ALL CLEANOUT COVER TO MATCH FINISH GRADE. DI VIS10A TA 1+26.36 = 40' 6 CLEANOl TE=67.0± W$3046\ 55 E-60.49 r1'F1 11101 TO ANI r PICKUP EXISTING LINE ON TRUCTION. INFORM 'im 64.79 OUT OF THE BUILDING C TR ijAN l ENGINEER IF 2% MIN. GRADE 'E, 1-9,3(l Nw) LOCATION CANNOT BE MAINTAINED. DE VERIFIED. 9LF-,V- - - - - - - Atl u 0 Zl MIN. I uma -"f: M 68.30 ,A)l C 61 — ALL SSW+ 01 4P '4�-1,, -ro jvsj -7 70,56 P rjf,�m FLOOR Is Atil v V A 11 p t 4T," A"11-1 t\7 -F- 2�11)t 0 1 :7T- TE S89*46 5 N L,"� 71E=5E ��:I- -- E&I WI-N! -10*SS 0 0 N MH'S EXISTI-NP 10" SS 0111 N.- 5DMH R'. ;C 15 21 - 0'1� RIM 65.14 RIM 64 95 RIM 65 60 Ill CMP E) !E l W) IE l W) '61�:O':cp E 551l IE N) BUSH, ROED & HITCHINGS, INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 MINOR AVE. EAST, SEATTLE, WA 98102 (206) 323-4144 FAX (206) 323-71�5 1-800-935-0508 E-MAIL: INFO@BRHINC.COM AASONARY BUILDING 4486 SbFT SB'9'4 'C)5,W 5' .79' ALE STRE-ET 7- -­7 -t .......... 2003019.0 1 40' WPG .1111111MAR1. CKED BDC RIM 69.06 TE 01/06/06 IE 63,1(12"CMP W) STREET HIS IE 64.0(12"CP E) 4z=— SEWE LINE REVISIO EDMONDS CENTER OF THE ARTS EDMONDS -410 4-rc, (I) WASHINGTON 84.09.00 pi'll - - l-' /Al l'- D AS NOTED E-NUGIINEERING -- -------- Date: 80 4 80 vi NEW, QUILQINd� ADDITI > Ll --- - --- T- NOTE: IALL CLEANOUT TO, HAVE c iCAST IRON RING COVERI I NEW WALK t 70 Iy_ NEW ALK EXIST ROPOSED FIRE LINE WATER F RE LINE -�� LF�- 6" i /32.6 1 0- S IE=57.7*- INSE ONN� rl) + < TA TEE 50 N la -j- 0 tc) IE=5-,. R, 771M-EMV F- U) (D id - �Lj — 4500 �d 0+00 0+50 f 6" Ki c\j 00 F- V). 1+00 LJ 1+50 - R------170 27.561F- PVC CC) 6"- 2.0% 2�F 6" 59.08LF- 61 07- --4 --------- p C-0-2-.0 00 i 0 ci 0 0 z z < < 00 z < + '-eO-F,5 + '_j u .0 < ui �0 F-- 00 "j �6 0z '1 6 L -1 2+00 2+50 3+00 60 50 'JOB NO 200301�00 PROFILE: 1"=10' VERT. JAN 12 2006 SCALE AS NOTED DRAWN WPG 1 "=40 ' HOR. 6NGlNE6R1lVG CHECKED BDC 1 DI V'SION DATE 01/06/06 BUSH, RCIED & HITCHINGS, INC.' REVISED SEWER PROFIL�E CIVIL ENGINEERS & LAND SURVEYORS 2009 MINOR AVE. EAST, SEATTLE, WA 98102 (206) 323-4144 FAX (206) 323-7135 EDMONDS CENTER OF THE ARTS 1-800-935-0508 E-MAIL INFO@BRHINC.C:OM EDMONDS WASHINGTON PAGE 2 UAldd\2003019\dwg\xe-GRD.dwg, 01/06/2006 01:23:34 PM 4 & - 100 CITY OF EDMONDS BUIL_QING DCPARTMENT 5/ > WOR 6A(e ADDRESS -4ZO-2�t&jZ&Z OWNER APPROVED DATE BLDG.OFFIC!AL PERMIT NUMBER PROJ ECT: [Obtain Electri=cal�Permjt from - a it f om S ! L bor ��ndu7 CLIENT AGENCY: n State Labor & Industries G E N E RAL CO NTRACTO R: DESIGNER ?LAtjtjjNG SIGNAGE CONTRACTOR: city of El dmonds D'Iffld"aug Dapa. rtnn ent 02003 Editiod IRC w/WAC Amendments 132003 Edition EBC w/WAC Amendments 02003 Edition UPC w/WAC Amendments and Appendices A, B, Q I 02603 Edition IMC wjWAC Amendments 02003 Edition EFGC w/WAC Amendments 02003 Edition 1FC w/WAC Amendments 132003 Edition VLAQ WAC 51-13 [3J004 F�- -tin" V.1'ZT7,r VIA r F. i - j Edmonds Center for the Arts 410 4th Ave. N Edmonds, WA 98020 Joseph Mclalwain Edmonds Center for the Arts 121 5th Ave. N Edmonds, WA 98026 425 275 4483 joegedmondscenterforthearts.org Scott Bastiani Sellen Construction 227 Westlake, Ave. N. Seattle, WA 98109 206 805 7174 fax 206'623 5206 Tom Bender Wpa, Inc. 911 Western Ave. Seattle, WA 98104 206 233 05 50 fax 233 0663 Marius Bernotavicius DOTY + ASSOCIATES 2230 First Ave. South Seattle, WA 98134 206441 9301 fax 206 441 9303 S :Z�l T HEET 12 RECEIVED SEP 0 5 2006 BUILDING DEPARTMENT C4TY OF EDMONDS At N 74th Ave. Doty + Asoociates of Washington, Inc 2230 First Avenue South Edmonds Center Seattle, WA 98134 for the Arts Property Line Parking Lot d ffib h d s,'.E,.6 n te rj oi�*-, -t 140'.--A h-A. "'U N 4`1 GAt ven e. �zEdrb6nds--MX*-9-8020 j 4 Existing Music Building A Daley St. I Sign E- SITE PLAN 6th Ave. I RESU13 SEP 2 0 2006 BUILDING DEPARTMENT CITY OF EDMONDS i- APPROVM AS NOTED BY EiNGMEERING Date: — 1ttfL2=, 616im To 8F, Ur-&Te�v 67IJ )OP'mTe7 ~ew--ry ALIGILIST 16, 2006 WEST ELEVATION SCALE: 1/16"=V-0" Doty + Asoociates of Washington, Inc 2230 First -Avenue S o u t h Seattle, WA 98134 Edmonds Center . fortheArts E-1 WEST ELEVATION epartme-M dnal ALIGIUST 16, 2006 RECEIVED SEP 0 5 20066 BUILDING DEPARTMENT CITy OF EDMONDS SOUTH ELEVATION SCALE: 1/16"=l'-O' Doty + Asoociates of Washington, Inc 2230 First Avenue South Edmonds Center Seattle, WA 98134 for the Arts E-3 SOUTH ELEVATION uepartment i I ty of rag AUGIUST 16, 2006 RECEIVED I SEP 0 5 2006 BUILDING DEPARTMENT CITY OF EDMONDS PLAN VIEW ....... . .. 69'- 6" (Total Arc Length of Curved Bar Below Letters) EQ EQ EQ —Font Scala Sans LF, Bold. 681-Ill 18'-4 1/2" V-4 5/8' 14'-4 1/8- V-5 5/8- 6'-5 1/2- V-3 5/8- 6'-6 3/8- V-3 7/8- 8'-10 3/4- 1 T _285 N. 7- 28t� 28.3c­ :3 1/2" 7 /2" 7'-1/2" 7'-1/2" 7'- 7'-1/2" CL CL ;t 2V CL V 101 T IT '7 101-011 7 7 7 7 101-011 '7 7 -011 91-611 101-01, ;m- 101-01, 101-01, segment cuts \--mounting plate locations m (ant rt cityof r4 j . ......... 7 . . ...... ^:,-_ ............. . ..... MOUNTING ELEVATION. SIGN TYPE E-1 Location S.07 Scale: 3/16" = 1 '- 0" Power Use: 700 Watts (4 Transformers 1.4 Amps each) Quantity 1 set Doty + Asoociates . of Washington, Inc SIGN TYPE E-1 JUNE 15, 2006 RECEIVED 2230 First Avenue South Edmonds Center 4.1 Seattle, WA 98134 for the Arts SEP 0 5 2006 BUILDING DEPARTMENT CITY OF EDMONDS 65" 6511 47" 4711 2111 21 5.5"]t f5.5 351-011 30f-Off 20'-0" 10f-011 0 101-011 20'-01f 301-011 351-011 EXISTING ARC OF BUILDING FACADE USE THESE COORDINATES TO ESTABLISH ARC OF MOUNTING CHANNEL FOR LETTERS (caw 01 TA'64 MOUNTING ARC. SIGN TYPE E-1 Location S.07 Scale: 3/16" = 1'- 0" Quantity 1 set Doty + Asoociates of Washington, Inc SIGN TYPE E-1 JUNE 15, 2006 RECEIVED 2230 First Avenue S o u t h Edmonds Center 4.2 Seattle, WA 98134 for the Arts SEP 2006 BUILDING DEPARTMENT 9TY OF EDMONDS UJI LLI I: _J LETTER ELEVATION AND SECTION. SIGN TYPE E-1 Location S.07 Scale: Doty + Asoociates of Washington, Inc 2230 First Avenue South Seattle, WA 98134 CL if LED lighting, secured to back 3 of letter 00 r Sides and front of letters are ers are stainless steel sheet. Front of 4�' UJ letter is water -jet cut. Stainless steel 304 wire cloth 5 mesh, 0.041 gauge (manufactured by McNichols), cut to shape of letters. 1/8" thick translucent white acrylic laser cut to shape of letters. Stainless steel wire cloth and acrylic diffuser are held in place by stainless steel tabs, screwed to sides of letter. Obta St6h, Back of letter is 1/4" thick aluminum plate, water -jet cut. Sides and front of letter are removable for access to lighting. They are screwed to tabs that are welded to back of letter. CR Wiring for lighting to run through wall to tran s ormers located on other side. Establish proper location for transformers on site prior to fabrication. A Inside faces of stainless steel letter to be lined with 3M light enhancement film #3635-100 (typ.)r Stainless steel pipes, welded to back of curved aluminum fabricated tube with stainless steel skin, and welded to pipe supports anchored to wall. 3" square aluminum fabrication -------- cy LU with stainless steel skin, curved to match curve of wall. Back of letter is welded to el 4 curved fabricated support bar. .Stainless steel pipe support and end plate, welded togeth t 3' and anchored to wall. f 1/4" LR.Iectr 1 PRI - I & Q� V 'i i> from 7 /2'.' H ilti Anchor with epoxy securing end plate to wall. Note: The wire cloth face to remain natural finish (unpainted). All other visible stainless steel components of sign, including screws, are to be painted to match Matthews M P1 9891 Airstream Silver Metallic, topcoated with 6125SP tactile clear matte finish. Edmonds Center SIGN TYPE E-1 JUNE 15, 2006 RECEIVED for the Arts SEP 0 5 2006 BUILDING DEPARTMENT CITY OF EDMONDS arm 7V 4.3 Thickness of return material. Trim face (with inside I 1-1/2" Face LETTER CONSTRUCTION DETAIL AND SECTION. SIGN TYPE E-1 Location S.07 Inside return 1 -1 /') " A��M The return is set in off the edge of trim the thickness of the material. NOTE: Trim face will be inserted to back (cookie can style) an face Open ack lk . . . . . . . . . . . . . Backing Pan CERdD`— L-,_ --l-auhig D t-�;Partm ent 'y ; c '�3 Doty + Asoociates of Washington, Inc SIGN TYPE E-1 JUNE 15, 2006 2230 First Avenue South Edmonds Center SEP 0 5 2006 4.4 Seattle, WA 98134 for the Arts BUILDING DEPAR . TMENT CITY OF EDMONDS LETTER MOUNTING RAIL DETAIL. SIGN TYPE E-1 Location S.07 Scale: 1:1 Doty + Asoociates of Washington, Inc 2230 First Avenue South Seattle, WA 98134 Satin stainless steel cladding on all sides 1/4" Aluminum plate bulkhead FA 3" 1-f7 rt t a f 'ti 4, w- gz� 44 ...... .... . . . 'q. % -7- 1/4" Aluminum plate bulkhead Fabricated aluminum 3" square tube Edmonds Center for the Arts SIGN TYPE E-1 JUNE 15, 2006 RECEIVED . SEP 0 5 2006 BUILDING DEPARTMENT CITY OF EDMONDS 4.5 41' 211 (i, 2 7/8" 21/2" 13/8" Ln C� W 02 3/8" Aluminum plate with 1-1 /2" steel support pipe welded to surface and hole drilled through which to run electrical wire 3/8" Hilti Anchor with epoxy securing end plate to wall. LETTER RAIL MOUNT DETAIL. SIGN TYPE E-1 Location S.07 Scale: 1:1 RECrmnir-m Doty + Asoociates of Washington, In.c SIGN TYPE E-1 JUNE 15, 2006 6� a"o 14�s 2230 First Avenue S o u t h Edmonds Center SEP 0 5 2o06 4.6 'Seattle, WA 98134 for the Arts BUILDING DEPARTMENT CITY OF EDMONDS M 611 T Ln Walkway leading to street. l'-6'1 side A& B R. I 00 M N. Al I exposed faces of"' aluminum to be painted to match Matthews MP 18249 Dark Metallic Pewter, topcoated with 6125SP tactile clear matte finish. GYM DONOR RECOGNITION (Freestanding). SIGN TYPE E-3 Location S.02 611 33/4- B 1/8" thick aluminum panel at top of tower C 1-1 D welded to frame. A Inside faces of stainless steel letter to be lined side locations with 3 M light enhancement film #3635-100 (typ). Waterjet cut 1/4" aluminum plate bulkheads welded to 1 /8" 3/4" wall square aluminum tubing Cut is waterjet cut through faces with 1/8" frosted clear acrylic push-throughs W with white acrylic diffuser.. Slimline Fluorescent lamps side C & D Power Use: 230 Watts (1 Transformer @ 1.75 Amps) and ballast at base. Two faces are removable for servicing and mounting to steel tube. Hole in base plate for conduit. Route power through concrete base into the base pipe for the sign. 1/4" aluminum plates welded to frame, aluminum nut welded to plate \r 3-1 /2" square steel tube welded to 1/2" thick 10" square galvanized steel base,base plate. 4-3/4" Dia x 36" GalvanizedThreaded Rod. Concrete footing is 12" dia. x 48" deep. r�u V C: U Doty, + Asoociates of Washington, Inc SIGN TYPE E - 3 JUNE 15, 2006 230 First Avenue South 2 Edmonds Center S.EP o 5 2w 5.1 Seattle, WA 98134, for the Arts BUILDING DEPARTMENT CITY OF EDMONDS IEQ.IEQ-1 NEE Continuous Slimline flourescent lamps. Ballest at ends. Countersunk flat head socket pin screws, painted to match aluminum panel. Tap hole in tube. . 1/8" thick aluminum panel. (2) sides are removable for access Panels on other (2) sides are plug welded to frame. Copy is waterjet cut into aluminum panels on (4) sides Fit flush push -through 1 /8" thick. laser -cut acrylic letters (frosted) into aluminum panels. Letters are adhered to 1/8" thick continuous acrylic backer sheet (translucent white) with clear adhesive. Acrylic backer is adhered to back of aluminum panel with VHB tape. 3/4" x 3/4" x.1/8" aluminum tube, typical at corners. detail 3 Water*et cut 1/4" aluminum plate gulkheads welded to 1/8" wall 3/4" square aluminum tubing GYM DONOR RECOGNITION SECTION DETAIL(Freestanding). SIGN TYPE E-3 Location S.02 Scale 1:2 X C detail 4 0jftL--' lot, L15 1/8" thick aluminum panel. (2) sides are removable for access Panels on other (2) sides are plug welded to frame. HSS 3-1/2" x 3-1/2" x 3/8" steel tube galvanized, capped at top. 3" wide x 1/4" thick aluminum flat bar (typ.), welded to aluminum tube frame. Bolt aluminum flat bars to steel square tube with stainless steel through bolts, (2) in each direction: Aluminum nut welded to plate. (City of Fd, pncn-ls Depcirtment A\ i rl"D PLA H, T�TROVEL� Doty + Asoociates of Washington, Inc SIGN TYPE E-3 JUNE 15, 2006 2230 First Avenue South Edmonds Center 5.2 Seattle, WA 98134 for the Arts SEP a 5 2006 BUILDING DEPARTMENT CITY OF EDMOND$ RESU13 SEP 2 0 Ilu 0 E P�A A �T&lhl F ED 51�� 5 EMU HLE RECEIVED S.EP 0 5 2006 BUILDING DEPARTMENT CITY OF EDMONDS I *'STREET FILE PLANNING DATA SIGNS SITE ADDRESS: 191,16 __Wk AVP-. &I ZONING: 1P DATE: AN PLAN CHK#: I CY19 NAME OF.BUILDING PERMITAPPLICANT: PROJECT DESCR IPTION: r,-A-- *C---- 11-,_ - / _A - - _ _11N AA ADB FILE #: PL.N--QocG-L-aY OR DATE WAIVED: /A PLANS MATCH APPROVED, PLAN: AS TOTAL AREA PER TYPE OF SIGN: TOTAL Sign area Allowed Matrix Area allowed Type of in- Conditions Allowed Per for this Sign Zone?_—MetI. Unit Unit sign Example. Wall, wl Yes, wl Yes I sq. ft./ fin. 41 foot 41 squar'e Intemal cond. ft. of attached feet flium. attached waY wall SIGN 1 i4ervtA Atlj&- AIIA, 141A (A I-,-, SIGN 2 N3 TOTAL SIGN AREA FORSITE TENANT: Maximum Allowed: Previous Totak Proposed Total: pe-e,, S b 43-7 10 ' ECK) C, I YL16 C_ zzr\e-, zk-�A_n ;Z., C,.,A, (Ocz>cl CAI �e, 1A1ibrary\p1anning\fbrms & handjo�ut \staff re \A -op . plandat SIGN.doc Z W00C "D LA_C_(_CXA^0/1j �� I % �_ IL - , ) SIGN HEIGHT: Sign Type: Lo-4 Maximum Allowed: Actual Height: L Sign Type: RykorN ol Maximum Aflowed: t4 Actual Height: f Sign Type: Maximum Allowed: Actual Height: SIGN LIGHTING: Sign Type: Lighting Proposed: Allowed in this Zone: kercyt,\ 'A CV-.% SignType- 0 Cighting.Proposed. oc Allowed in Zone: Sign Type: -Lighting Proposed: Allowed in this Zone: SIGN COLORS: Proposed: Acceptable? ADB Approval? SIGN LOCATION: Proposed: N/4 If Freestanding and 3 feet or over (unless on a fence) meets setbacks?_ Dc, Required Setbacks: . Rear: $�O. 030. ID Front: Left Side:— Right Side: Actual Setbacks: Front: Left Side: —Right Side: Rear: LANDSCAPING FOR FR7ESTANDI N,G SIGNS: Size: Location: CRITICAL AREAS # (Freestanding Signs Only): Waiver / Meets CA requirements REDUCED'SITE PLAN (8.5X11) PROVIDED FOR STREET FILE? Ye—lz, OTHER: Plan Review By: 0 ko/qk 1Afibr.arY\p1anning\forms & handouts\staff rcports\^p1andat—S1GN.doc 11.4; Edmonds Public Facilities District Facility Use Clarifications Prepared 1/20/2010 B y: Jeff Vaughan, Operations Manager Orchestra Level Spaces: Room 131: "Administration"; to remain as such unless and until future large scale development of alternate office space on ECA campus. Room 134: "Administration / Green Room Pantry"; Office supplies storage, employee "kitchen" with refrigerator, microwave, sink, dishwasher. Prov . ides for storage and cleanup of green room catering supplies, back stock of food and beverage for service to performers. Clothes Washer a nd Dryer for performer and facility laundry. Room 136: "Green Room"; Typical use for this room is an informal gathering space as accessory to the theatre for performers. May also be used as dressing room. Prepared food and drink for performers is offered in the green room. When not in use for theatre presentations, the room can host small business meetings with the possibility of food and beverage. Room 139: Ensemble Dressing Room Closet"; Storage Only Room 140: "Ensemble Dressing Room"; Accessory space for theatre performances. Currently partitioned with flame retardant theatrical drape to create two dressing spaces. Could have future potential as meeting space or multi -purpose classroom space with foo d and beverage allowed. Room 150; "Crew Room" "TD Office" and "Workroom" See revised diagram. "Crew Room"; is a casual break room/office for working theatre technical crews and facility monitors. Max. Occupancy 8. "TD Office"; Office space for Technical Director. Max Occupancy 3. "Workroom"; storage of theatre related equipment and materials with work benches for material preparation and equipment repair. Can serve as prep and storage area as accessory space for gymnasium special events. Max. Occupancy: 4. Room 145; "Gymnasium" Most commonly used for sports practice with no use of bleacher seating. Occasionally used for sports games, with spectators in bleacher seating. Occasionally used as additional dressing room or holding area, as accessory space for theatre performances. Occasionally used as special event space: Annual gala auction. Future potential for use -as exhibit space, dances, reunions, other special events with food and beverage. Max Occupancy: Floor Only: TBD Floor with Bleachers: TBD Room 104; "Catering Pantry" Accessory to Lobby space. Storage of furniture, equipment, food and beverage for service in Lobby. Gathering space for theatre ushers. Plating , presentation, and clean-up of food prepared off - site. Future plans may include the addition of dishwasher, ice machine, 3 compartment sink as required for expanded beverage service, as well as capacity to hold warm food with portable "hot boxI. Max Occupancy 15. Auditorium Lobby: Should be A-2 Occupancy to be allowed service of food and beverage as needed. Note: This space is used in conjunction with theatre events, and may be used (non -concurrently) as stand-alone special event space. IFIECEIVED S"T R E A'i, _-=7 F L E FEB 16 2010. DEVELOPMENT SERVICES CTR. PITV nr rru�­ _VI Edmonds Public Facilities District, Facility Use Clarifications, p.2 1/20/2010 Balcony Level Spaces: Room 220; "ED Office". Office space for Executive Director. Occupancy: 2 Room 221: "North Classroom"; Multi -purpose meeting room. Meetings, receptions, dressing room, warm-up space, rehearsal space, fitness classes, school testing, music classes, dance classes, business meetings, seminars, workshops, training. Food and beverage service capable. Room 225: "Center Classroom"; Multi -purpose meeting room. Meetings, receptions, dressing room, warm-up space, rehearsal space, classroom functions, business meetings, seminars, training. Food and beverage service capable. Room 225 D: "Classroom Pantry"; Storage and preparation area as accessory to classroom use. Occupancy: 4 Room 225 E: "Projection / Control"; Storage and control of audio-visual functions for center classroom Occupancy:2 Room 226: "South Classroom"; Multi -purpose meeting room. Meetings, receptions, dressing room, warm-up space, rehearsal space, fitness classes, school testing, music classes, dance classes, business meetings, workshops, seminars, Training. Food and beverage servic e capable. Potential B Office Lease? Room 228: Storage Only mECH. MAIN ExiT 50/ TOTALV� 110 - �L. (J N CAPACI T Y 1 N� 0 I", SIAJR;11�:; TNR. 3! del A -2 ACCESSORY USE TBD d Iq A-10CCUPANCY STAGE A-IOCCUPANCY Dol AUDITORIUM IS. N6 A I OCCUPANCY A-2 OCCUPANCY C�VERCID PIT LOBBY OR ORCHESTRA PIT NON -SIMULTANEOUS USE r A " BY AUDITORIUM OCCUPANTSNA ED L80 i A-2 ACCESSORY USE CONCESSIONS STAIR,�4! 7-1 1247 :7- -7. STAJR,,2 I ;-.' . I . . - 1, 7- A-2 ACCESSORY USE 7 -IV ;wtz, 1"14 C, AM)ITIMI Al 17VIT CODE ANALYSIS NOTES APPLICABLE CODES: 2006 INTERNATIONAL BULD94G CODE (INCLUDING ACCESSIBILITY) Wlim STATE AkIENDLfNTS 2006 INTERNATIONAL KIECHANICAL CODE (VICLUDING INTERNATIONAL .FUEL GAS CODE) WITH STATE MENDMENTS 20D6 INTERNATIONAL FIRE CODE WITH STATE MNDVD9S 2006 UNIFORM PLLUGING CODE WITH STATE AMMUENIS WASHINGTON STATE ENERGY CODE (WAC 51-11) WASHINGTON STATE VENTILATION INDOOR AIR OUkIlY CODE IWAC 13) IMAINISIAl 17.1-1998 ACCESSIBLE AND USABLE 13LIlDINGS AND FACILITIES EDMONDS CONULIHITY DEVELOPIkHT CODE OCCVANCY CLASSIFICATION: MIXED USE . ...... . . ........ 8 oCCUPmCY FLEX USE A-2 OCCUPANCY DRESSING ROOM/GREEN ROOM A-2 OCCUPANCY ACCESSORY KITCHEN pa) M 61V-W, t'i Gizeat-1 p-i pllv� ACCESSORY STORAGE A CCUPANCY DRESSING ROOM TD OFFice a -3 A-2 OCCUPIED A-3 NON SIMULTANEOUS = t, I wou qwm 8 OC&PANCY Ulu al r CREW ROOM Crete (Ift ��Aff GYM STAIR 1 140 A-2/A-3/A-4 OCCUPANCY GYMNASIUM F8 0 Edmonds Public Facilities District/ Edmonds Center for the Arts Notes on concurrent use as required for Change of Use permit Prepared 2/10/10 By: Jeff Vaughan, Operations Manager Background: These notes are in response to COE Memo on proposed change of occupancy, dated September 1, 2009, found under "General Comments" #8. The identification of distinct zones in the first proposal by Grace Architects was an attempt to provide clarity and demonstrate that at different times, different parts of the facility operate independently. Based on the notes from the city, provided in their comments on the Memo, it Was more confusing to separate the facility into zones. For the balance of our change of use submittal, we have removed the delineation of zones and refer to each space by room number and purpose. This document serves to illustrate relevant examples where more than one function is occurring simultaneously (concurrent use) and how that use is managed. Typical current facilitV use: Theatre Events: The s�ale of events in the theatre varies, and the schedule of events is 100% demand — driven and random. The majority of theatre events are on weekends. The majority of theatre events utilize the "Green Room" and "Ensemble Dressing Room" as accessory support spaces for performers. Additionally, the restrooms on the first floor hallway service the performers. As demand dictates, occasionally some or all of the upstairs classrooms are also used as dressing rooms or warm-up rooms. Conversely, there are a small percentage of performances where there is no need to utilize any portion of the classroom wing, because all performers can utilize the dressing room facilities found within the "new addition" portion of the building. The public enters for theatre events through the lobby doors. Performers and event staff enter backstage through the stage doors. Lobby -only Events: Clients can utilize our auditorium lobby to hold meetings, presentations, social functions. We host less than six per year currently. We have established that we can seat 100 people. theatre style, with reasonable room left for egress and room for display. The theatre is not occupied during lobby -only rentals. Classroom use: The type and duration of use of our multipurpose classrooms (221, 225, 226) varies widely. We rent classrooms by the hour. Generally, individual renters only seek one, and not multiple rooms. We have had on occasion different activities in different classrooms concurrently. Accessible path of travel, if needed is provided through the theatre lobby, up to the theatre'balcony level and utilizes our accessible lift, to get up to the level of the second floor classrooms. Restroom access for the classrooms can be either the balcony level restrooms, or the first floor restrooms. The majority of our classroom use is on.weekdays. Users of the classrooms are generally directed to the Administrative entrance. FEB 16 2010 STREET FILE DEVELOpMENT SENCES CTR- C11Y of EDMONDS Gymnasium use: Approximately 90% of the gymnasium use is occurring weekday evenings for sports league practice. 10-20 participants are rotating through every hour or 90 minutes between 5prn and 9pm. We do host a limited number of after -school games 3:30pm-5:00pm, with small numbers (under 100) spectators in the bleachers. Users of the gym are directed to 6 th street doors as their main point of entry. Long-range facility hopes: Theatre: Increased daytime activities servicing corporate clientele. Partnering with Edmonds Conference Center. Expanded beverage service — mixed drinks. Further development of pantry space to accommodate hot and cold food holding capability, commercial dish washer and ice machine. Lobby: More frequent use of the lobby for suitable meetings and special events. Classrooms: more frequent, recurring use of classroom spaces, hopefully arts based: music, dance, drama. increased use of center classroom for business and civic meetings and social functions. Gymnasium: Increased use of the space for special events: exhibition hall type functions, dances, reunions. Concurrent use determinations: It is the responsibility of the Operations Manager to schedule all facility use and execute all facility rental agreements. Additionally, the Operations Manager schedules facilities staff to monitor and support non -theatre related events. Theatre related events are,managed by a team consisting of the Technical Director/Stage Manager and the Patron Services Manager. The ability to host events is based on what activities currently exist on the event calendar and if and how events can occur concurrently. When a conflict is anticipated, priority for events is given to theatre events, in keeping with the mission of the facility. Possible concurrent use examples: Offered here are some examples of different types of events that could occur simultaneously: • Concurrent classroom use. Access to other portions of the building controlled by locking doors, if needed. • Classroom use and gymnasium use. Access to other portions of the building controlled by locking doors, if needed. • Lobby Only Event and Gymnasium or Classroom use: Separation of groups controlled by locking of doors. Separate restroom facilities in use for each. • Small-scale theatre performance (assumes limited number of perforrTiers and/or audience) and Classroom use or gym use: would be allowable i f scope of classroom occupancy is small and scope of performers is small. Access to theatre areas by classroom or gym users is controlled using signage and staff supervision. It is important to note that it would almost never occur that the various types -of use would occur at exactly the sometime for exactly the some duration. It would be most common to consider the potential to host a short -duration classroom function within a longer duration theatre event. Sho-King Music Educators: Utilize all spa ces for one event concurrently, with carefully planned and monitored paths of travel. Total occupant load among all spaces: 300 Prohibitive concurrent use examples: Offered here are examples of different types of events that would not be able to occur simultaneously based on the current facility configuration: Large scale theatre event and large scale gymnasium special event with different patrons. Prohibitive by virtue of parking capacity and a�cess to "backstage" dressing room and restroom facilities by gymnasium or classroom users. Large scale or high profile theatre event and small scale gymnasium or classroom events. Prohibitive because of contractual agreement with performing artist to limit access to "backstage". Example: Indigo Girls, Smothers Brothers. — NMU) I UTrr NELLI TURY (6) DAY LILY IN TWIS BED owlAwlAwlowWvA INSTALL NEW 4JTOMATIC IRRIGATION IN ALL PLA14TED AREAS EXCEPT AS NOTED 1p M-1010-11,111 CONTRACT w% 0 1 14 f4A 1^40" f Ow 0 r � ��,1000w�oo�o� - 0 rlp (S) 140STA (S) FEW IN TWIS BE EXISTING I IRRIGATIO RESTORI 0 I&I'Vowr Geotechnical Engineering Design Study Edmonds Center for the Arts Edmonds, Washington Prepared for LMH Architects May 21, 2003 7895 -vo RECOVED SEP - 3 2034 BUILDING DEPT. b,'YRMET FLE AM ALIF HA. RTCROWSER Delivering smarter solutions Geotechnical Engineering Design Study Edmonds Center for the Arts Edmonds, Washington Prepared for LMN Architects May 21, 2003 7895 Prepared by Hart Crowser, Inc. NV A WA�Y W22 EXPIREP Reda A. Mikhail, P.E. Sr. Project Geotechnical Engineer 1970 Fairview Avenue last Seattle, Washington 98102-3699 Fax 206.328.5581 Tel 206.324.9530 www.hartcrowsercom Anchorage Boston Denver Edmonds Eureka Jersey City Juneau Long Beach ff�r e y� a g rn E. Principal Portland Seattle CONTENTS Page INTRODUCTION 1 PURPOSE, SCOPE, AND LIMITATIONS OF THIS STUDY I Purpose 1 Scope of Work I Limitations 2 SITE AND PROJECT DESCRIPTION 2 SUMMARY OF CONCLUSIONS AND RECOMMENDATIONS 3 FIELD EXPLORATIONS AND LABORATORY TESTING 4 SUBSURFACE CONDITIONS 5 GEOTECHNICAL ENGINEERING CONCLUSIONS AND RECOMMENDATIONS 5 Seismicity 6 Foundations .7 Slabs -on -Grade 9 Drainage Recommendations I I Structural Fill 12 Temporary Excavations 13 Impacts of Soils on Concrete 14 RECOMMENDATIONS FOR ADDITIONAL GEOTECHNICAL SERVICES 14 TABLE 1 EarthqUake History 6 FIGURES I Vicinity Map 2 Site and Exploration Plan Hart Crowser Page i 7895 May 21, 2003 CONTENTS Page APPENDIX A FIELD EXPLORATIONS METHODS AND ANALYSIS A-1 Explorations and Their Locations A-1 Auger Borings A-1 Standard Penetration Test (SPT) Procedures A-1 FIGURES A-1 Key to Exploration Logs A-2 Boring Log HC-1 A-3 Boring Log HC-2A A-4 Boring Log HC-2B A-5 Boring Log HC-3 Hart Crowser Page ii 7895 May 21, 2003 -1 GEOTECHNICAL ENGINEERING DESIGN STUDY EDMONDS CENTER FOR THE ARTS EDMONDS, WASHINGTON IINTRODUCTION This report presents the results of our geotechnical engineering design study for the proposed Edmonds Center for the Arts in Edmonds, Washington. The new facility will be comprised of the southern part of the old, existing Edmonds High School and two proposed additions. The project site is located along Daley Street between 4th Avenue North and 6th Avenue North. Figure 1 is a Vicinity Map of the project area. Figure 2, Site and Exploration Plan, shows the proposed building additions and our exploration locations. This report contains several sections, organized as follows: m Introduction; n Purpose, Scope, and Limitations of This Study; n Site and Project Description; m Summary of Conclusions and Recommendations; m Field Explorations and Laboratory Testing; m Subsurface Conditions; m Geotechnical Engineering Conclusions and Design Recommendations; and n Appendix A addressing Field Explorations Methods. Figures are provided following the text. Appendix A follows the figures, and presents logs of our geotechnical borings. PURPOSE, SCOPE, AND LIMITATIONS OF THIS STUDY Purpose The purpose of our work has been to provide geotechnical engineering recommendations relevant to the design and construction of the proposed Edmonds Center for the Arts. Scope of Work Our scope of work is presented in our proposal dated April 1, 2003, and the Contract Change dated April 24, 2003. The purpose of the Contract Change Hart Crowser Page I 7895 May 21, 2003 -1 was to drill an additional boring as described below. Our scope of work included the following: m Subsurface explorations consisting of one boring at each addition location (included in our proposal) and one boring located in the vicinity of the North Addition (included in the Contract Change); m Geotechnical laboratory testing on soil samples collected from our I explorations; n Development of geotechnical conclusions and design recommendations related to the following: Seismic considerations in accordance with the 1997 Uniform Building Code (UBC); Foundations; Slabs -on -grade; Drainage; Structural fill; Temporary excavations; and Impacts of soils on concrete; and Im Preparation of this report. Limitations We completed this work in general accordance with our scope of services included in our proposal and the Contract Change referenced above. Our scope did not include environmental assessment of the site soils. Our recommendations presented in this report were developed based on our current understanding of the project. Our report is for the exclusive use of the LMN Architects and the project design consultants for specific application to the subject project and site. We completed this study in accordance with generally accepted geotechnical practices for the nature and conditions of work completed in the same or similar localities, at the time the work was performed. We make no other warranty, express or implied. SITE AND PROJECT DESCRIPTION Our understanding of the project is based mainly on the information provided by LMN Architects, the project architect. Hart Crowser Page 2 7895 May 21, 2003 The project site is located along the north side of Daley Street between 4th Avenue North and 6th Avenue North in Edmonds, Washington (see Figure 1). The project will consist of two additions to the southern part of the old, existing Edmonds High School campus (no longer used as a school), which will become the Edmonds Center for the Arts. The two additions are designated in this report as the North and South Additions. The North Addition will be located north of the existing theater and consist mainly of remodeling this part of the structure, which includes a basement level. The footprint of the North Addition is about 80 by 100 feet. This addition will require removal of the existing interior foundations and construction of new foundations. The existing exterior, basement walls with their foundations walls will remain. The South Addition will be located between the theater and the music building. The footprint of the South Addition is about 20 by 30 feet. The proposed South Addition is a one-story building with no basement. SUMMARY OF CONCLUSIONS AND RECOMMENDATIONS The following is a summary of the principal conclusions and recommendations contained within this report. Information presented in this summary is subject to conditions stated elsewhere in this report. The subsequent sections of the report should be consulted for expanded discussion of each point as well as further recommendations. Subsurface Conditions m Three borings, designated HC-1 through HC-3, were drilled at the locations shown on Figure 2. n The subsurface profile at the locations of the two borings (HC-1 and HC-3) drilled outside the existing buildings consists of 6 to 7 feet of uncontrolled fill overlying very dense glacially overridden Sand. n Boring HC-2 was drilled from inside the existing building at the basement level. Boring HC-2 was first drilled at the location of HC-2A as shown on Figure 2, and, because of refusal at 4 feet, was redrilled at the location of HC-2B. Boring HC-2B was also terminated at 3 feet because of refusal. The refusal at both locations is attributed to apparent concrete debris. Because the results of borings HC-2A and HC-2B are very similar, they will be referred in the remaining part of the report as boring HC-2. Hart Crowser Page 3 7895 May 21, 2003 -1 In Groundwater was not encountered during drilling in our borings. Geotechnical Engineering Conclusion and Design Recommendations Im Existing fill, without improvement, is not a suitable bearing layer. n The South and North Additions can be founded on shallow footings bearing on a minimum of 2 feet of compacted structural fill. The structural fill can be placed on existing fill (compacted in -place) or on the glacially overridden Sand. We recommend an allowable bearing pressure of 1.5 kips per square foot (ksf) for the case where structural fill will be placed on the existing fill, or 4.0 ksf for the case where structural fill will be placed directly on the glacially overridden Sand. m In the case that the foundations will be placed directly on the glacially overridden soils (feasible for the North Addition), we recommend an allowable bearing pressure of 6.0 ksf. m Granular on -site soils (existing fill) free of organics and deleterious materials can be reused as structural fill during extended periods of dry weather. During wet weather per iods, structural fill should be imported high quality, pit -run sand or sand and gravel with a maximum size of 4 inches and a maximum fines content of 5 percent. FIELD EXPLORATIONS AND LABORATORY TESTING Our subsurface exploration program consisted of three borings. The approximate locations of the three borings are shown on Figure 2. Borings H&I and HC-3 were drilled outside the existing buildings (about elevation 69 to 70 feet). Borings HC-2 was drilled from the basernent level (about elevation 61 feet) inside the existing building. A description of our field exploration program is presented in Appendix A. The laboratory testing consisted of water content determinations on the collected soil samples, and the results are presented on the borings logs in Appendix A. I I Page 4 Hart Crowser 7895 May 21, 2003 -1 I I I I I SUBSURFACE CONDITIONS The subsurface conditions encountered in the two borings (HC-1 and HC-3) drilled outside the existing building are very similar and generally consist of 7 feet of uncontrolled fill overlying dense to very dense, glacially overridden Sand. The fill encountered in boring HC-1 consists of loose to very dense Sand and Gravel. Given the small recovery of sample S-3 in boring HC-1, the boundary between the fill and the underlying glacial soils cannot be clearly identified. We assumed, as shown on the boring log, that sample S-3 is from the fill zone and the high blow counts are attributed to the presence of gravel rather than to the actual density of the soils at that depth. In boring HC-3, the upper two samples contain wood and brick fragments, suggesting that the top of the glacial overridden soils is at a depth of about 7 feet. The fill at the location of boring HC-3 can be attributed to the excavation of the basement walls. The depth of the fill is expected to be thicker closer to the existing basement wall. In boring HC-2, very loose to loose fill was encountered immediately beneath the slab overlying what appears to be concrete debris. Sampling and advancing the borings through this debris was not successful. Therefore, boring HC-2 was terminated at depths 3 and 4 feet (corresponding to elevation 58 to 57 feet), respectively, below the top of the slab at elevation 61 feet. Groundwater was not encountered during drilling in the borings. Note, however, that groundwater levels may fluctuate based on weather conditions, time of year, and other factors. We based our interpretation of subsurface conditions on materials encountered in our borings as presented herein. The nature and extent of variations between the explorations may become evident until construction. If significant variations then appear evident, it will be necessary to re-evaluate the recommendations contained in this report. IGEOTECHNICAL ENGINEERING CONCLUSIONS AND RECOMMENDATIONS We have developed our geotechnical conclusions and design recommendations based on our current understanding of the project. If the nature or locations of the new additions are different than we have assumed, Hart Crowser should be notified so we can change or confirm our recommendations. Hart Crowser Page 5 7895 May 21, 2003 -1 ISeismicity ISeismic History I I I I 11 Continuous historical documentation of seismic events has existed for about 140 years. The record is relatively complete for large magnitude events and incomplete for smaller earthquakes during that period. The major earthquakes which have occurred in Western Washington within that period are summarized in Table 1. Table 1 - Earthquake History Earthquake Date Modified Mercalli Intensitya (Epicenter) North Cascades 12/15/1872 Vill + Puget Sound 12/12/1880 Vi - Vil North Olympia 11/13/1939 Vil Pickering Passage 2115/1946 Vil Strait of Georgia 6/23/1946 Vill + Olympia 4/13/1949 Vill Seattle -Tacoma 4/29/1965 Vil Nisqaully 2/28/2001 VII+ a- The Modified Mercalli Intensity is a scale that reflects the level of earthquake intensity. This scale consists of 12 increasing levels that range form imperceptible shaking (lower numbers) to catastrophic destruction (higher numbers) Seismic Design Parameters According to the 1997 UBC, the proposed additions will be designed based on an earthquake ground motion with a 10 percent probability of exceedance in 50 years (475-year return period). The top 100 feet of soil at the site is best represented by Soil Profile Type Sc according to the 1997 UBC. The site lies within Seismic Zone 3, with a seismic Zone Factor (Z) of 0.3. Based on our evaluations of the subsurface conditions, particularly the fill conditions, the site soils are not likely to experience global liquefaction during the design earthquake. Hart Crowser Page 6 7895 May 21, 2003 -1 IFoundations I I I I I I I I I I I Based on our understanding of the project, we anticipate that the foundation loads will be relatively light such that shallow foundations would be feasible for both additions. South Addition. The existing fill underlying this area is not a suitable bearing layer because of its loose conditions (refer to sample S-2, boring HC-1), and the presence of organic materials within the fill. The glacially overridden Sand is a suitable bearing layer. As discussed above, the depth to the top of the glacial soils at the location of boring HC-1 was not well-defined during drilling, and can vary from 4 to 7.5 feet at this location. We anticipate that the bottom of the footings would not be deep enough to bear on the glacial soils. North Addition. As mentioned above, boring HC-2 was drilled from inside the building, but was terminated at a shallow depth Q to 4) feet because of the apparent concrete debris. The loose fill and the concrete debris encountered in boring HC-2 are not suitable bearing materials. Based on boring HC-3, the foundations of the existing building appear to be founded on the glacial soils. According to the 1932 drawing provided by LMN Architects, the bottom of the footings of the existing building is about 4.5 feet (corresponding to elevation 56.5 feet) below the top of the basement slab. In other words, boring HC-2 did not reach the elevation of the bottom of the foundations. Design Recommendations Considering the above, we recommend that the shallow foundations for both addition be founded on well -compacted structural fill. (A discussion about structural fill is presented subsequently). The structural fill can be placed either on the existing fill after it is compacted in -place (Alternative 1) or on the glacial soils (Alternative 2). Alternatively, for the North Addition, the footings call be founded directly on the glacial soils (Alternative 3). The following is a discussion about each alternative. Alternative 1- Structural Fill Overlying Existing Fill. For this alternative, the recommended minimum thickness of the structural fill is 2 feet. The existing fill should be compacted to a non -yielding condition prior to structural fill placement. Concrete debris should be removed prior to fill placement. The recommended allowable bearing pressure for this alternative is 1.5 ksf. Although this alternative entails some risk due to the uncertainties associated with the uncontrolled fill, this is a reasonable alternative in our opinion. Alternatives 2 and 3 entail less risk. Hart Crowser Page 7 7895 May 21, 2003 KE I I I I I I I I I I I I I Alternative 2- Structural Fill Overlying Glacial Soils. For this alternative, the thickness of overexcavation could be deeper than 2 feet as recommended for Alternative 1. The glacial soils should be compacted to a non -yielding condition prior to the placernent of the structural fill. The recommended allowable bearing pressure for this alternative is 4.0 ksf. Alternative 3 - Foundations Founded Directly on Glacial Soils. This alternative is feasible for the North Addition, where the top of the glacial can be as shallow as 4.5 feet below the top of the existing slab. The recommended allowable bearing pressure for this alternative is 6.0 ksf. Other design recommendations are as follows: m If the existing fill is replaced with structural fill, we recommend that the lateral extent of the overexcavation be defined by a plane extending outward and downward from the edge of the footing to the top of the underlying layer at an angle no steeper than 1 H: 1 V. For example, if the footing dimensions are 4 by 4 feet in plan view and the depth of overexcavation is 2 feet, then the exposed area of the existing fill or the glacial soils should be at least 8 by 8 feet in plan view. E Allow an increase in the allowable soil bearing pressure of up to one-third for loads of short duration, such as those caused by wind or seismic forces. n isolated spread and continuous footings should have minimum widths of 48 and 24 inches, respectively. m Place the base of all footings at least 18 inches below the lowest adjacent finished grade for consideration of frost penetration. m Footings should be founded outside of an imaginary I H:1 V plane projected upward from the bottom edge of adjacent footings or utility trenches. n For resistance to lateral loads, use an equivalent fluid density to represent the passive resistance of the soil. For a typical footing poured against existing fill, use an ultimate passive equivalent fluid density of 250 pounds per cubic foot (pcf). Use a factor of safety of at least 1.5 when calculating soil resistance to lateral loads. n Use an ultimate coefficient of friction to resist sliding equal to 0.4 for footings poured neat against compacted granular structural fill. Use a factor of safety of at least 1.5 when computing resistance to lateral loads. Hart Crowser Page 8 7895 May 21, 2003 I a A qualified geotechnical engineer or geologist should observe and document footing and backfill subgrade conditions during construction, prior to placement of the footings or structural fill. Foundation Settlement For foundations designed and constructed as described above, we estimate that the total settlement of individual footings will be less than I inch. We estimate that differential settlement between adjacent footings will be about one-half to three -fourths of the total settlement. We anticipate that settlements will be essentially elastic and will occur as loads are applied. Impacts of New Foundations on Existing Foundations The design of the foundations of the South Addition should account for the existing foundations supporting the theater and the music building Such that the excavation for the new foundations does not undermine the existing foundations. To reduce loads imposed on existing foundations from new foundations and vice verse, we recommend that the new foundations be located in a such way that an imaginary plane extending outward and downward from the higher footings (either existing or new) at an angle of 1 H: IV does not intersect the lower foundations and walls. Additional Recommendations for Foundation Construction The foundation settlements estimated above assume that careful preparation and protection of the exposed subgrade will occur prior to concrete placement. Any loosening of the materials during construction or the presence of loose material beneath footings could result in larger settlements than those estimated herein. It is important that all foundation excavations be cleaned of loose or disturbed soil prior to placing any concrete and that there be no standing water in any foundation excavation. Additionally, any abandoned utility pipes should be removed, sealed or filled with lean concrete to avoid piping of surrounding soils, which can result in Slabs -on -Grade settlement. In our opinion, the proposed floor slabs may be designed and constructed as slabs -on -grade. Based on our subsurface explorations, we do not anticipate any hydrostatic pressures acting on any of the addition slabs. Additionally, coring Hart Crowser Page 9 7895 May 21, 2003 -1 through the existing slab to drill boring HC-2 indicated that the basement slab is not reinforced, suggesting that the existing basement slab was not designed to resist uplift pressures. Due to the potentially variable nature of the existing fill as discussed above, there is a somewhat increased risk that there could be sorne differential settlement of the floor slab -on -grade if constructed over existing fill material. Tc reduce this risk, we recommend that the floor slabs be underlain by a* minimum of 18 inches of densely compacted, structural fill. Following overexcavation and prior to placing the structural fill, the exposed fill should be compacted to a dense non -yielding condition. Debris and/or soft zones in the fill should be removed prior to structural fill placement. We also recommend that slabs -on -grade not be structurally connected to the column support elements (footings). This will allow for potential differential settlement between the slabs and foundation supports, allowing the slab to "float." Although there is some risk associated with the use of slabs. -on -grade in this manner, in our opinion, this is a reasonable approach. A more conservative alternative is to design the floor slabs as structural slabs or to completely replace the existing fill soils with new structural fill that supports the slabs -on -grade. Although these approaches would involve less risk, they are generally more expensive than the first approach. The following is a summary of recommendations for the design and construction of the slabs -on -grade: m Provide a minimum of 18 inches of compacted structural fill beneath slabs - on grade. The structural fill should meet the requirements presented in the Structural Fill section of this report. m Provide a minimum of 4-inch thickness of compacted capillary break layer beneath the slabs -on -grade. This layer should consist of well -graded sand and gravel with less than 3 percent by weight passing the No. 200 sieve, based on the minus 3/4-inch fraction of this material. This layer may be considered part of the I 8-inch-thick structural fill. a Any soil that is to be considered for this capillary break material should be submitted to Hart Crowser for gradational analysis and acceptance prior to placement. Hart Crowser Page 10 7895 May 21, 2003 I m For design of the floor slab, use a modulus Of SUbgrade reaction of 100 pounds per cubic inch (pci), as measured on a I -foot-square plate. This assumes that the construction is accomplished as described above and that the capillary break layer is underlain by densely compacted structural fill. n Provide a vapor barrier beneath the slabs -on -grade. m Have a qualified geotechnical engineer or geologist observe the exposed slab subgrade prior to placement of the drainage layer or structural fill to verify suitable bearing surfaces. Drainage Recommendations Construction As mentioned previously, groundwater was not encountered during our explorations. Groundwater, however, may fluctuate based on weather conditions, time of year, and other factors. Additionally, perched groundwater can be encountered during the excavations for the footings. Therefore, local dewatering may be required during the foundation installation using sumps. Groundwater control during construction is typically the contractor's responsibility. Slab and Footing Drainage At the South Addition, we recommend that a perimeter footing drain be installed around the proposed addition. The drains should consist of minimum 4-inch- diameter perforated pipe surrounded by free -draining fill material. The 4-inch- thick capillary break layer beneath the slabs -on -grade recommended above will act as underslab drainage. The capillary break layer should be connected to the perimeter footing drains. At the North Addit�on, as mentioned above, we understand that interior footings will be placed, and the existing exterior basement walls with their footings will remain. We do not know whether there are perimeter footing drains currently in -place. In our opinion, new perimeter footing drains are not required. The 4- inch-thick capillary break layer beneath the slabs -on -grade recommended above will act as underslab drainage. The thickness of this layer can increase if previous observations by the maintenance personnel suggest drainage problems at the basement level. At this time, we do not anticipate the need for cross drains beneath the slab of the North Addition. If perimeter drains are in -place, the underslab layer should be connected to these drains. Hart Crowser Page I I 7895 May 21, 2003 -1 ISite Drainage The following recommendations are applicable to the South Addition: m Slope all roof drains to a suitable outlet away from the building; and n Do not connect the roof drains into the foundation or wall drains. Structural Fill New soil fill placed beneath footings and slabs -on -grade should be considered structural fill. Existing fill underlying the South Addition is generally not suitable for use as structural fill during wet weather periods. During dry weather periods, on -site soils that are free of organic and deleterious materials can be used as structural fill. Otherwise, we recommend using imported structural fill. Selection of Imported Structural Fill For imported soil to be used as general structural fill, we recommend using clean, well -graded sand and gravel with less than 5 percent by weight passing the No. 200 mesh sieve (based on the minus 3/4-inch fraction of the material). Where capillary break is required, we recommend importing a well -graded, free - draining sand and gravel with less than 3 percent by weight passing the No. 200 mesh sieve (based on the minus 3/4-inch fraction of the material). Placement and Compaction of Structural Fill Before fill control can begin, the compaction characteristics of the fill material must be determined from representative samples of the structural and drainage fill. Samples should be obtained as soon as possible prior to placement of the fill. A proper study of compaction characteristics will include determination of the optimum moisture content and the moisture content of these soils at the time of placement. We make the following recommendations: m Control the moisture content of the fill to within 2 p ercent of the optimum moisture. Optimum moisture is the moisture content corresponding to the maximum Proctor dry density. m Place and compact all structural fill in lifts with a loose thickness no greater than 10 inches. If small, hand -operated compaction equipment is used to compact structural fill, fill lifts should not exceed 8 inches in loose thickness. Hart Crowser Page 12 7895 May 21, 2003 -1 n Use small hand -operated compaction equipment within 18 inches of subgrade walls to avoid excessive stresses on the walls. n Compact structural fill to 95 percent of the maximum dry density as determined by the modified Proctor (ASTM D 1557) test procedure beneath all structural elements. n Field test the compacted densities of all lifts to verify compaction. Temporary Excavations The stability and safety of cut slopes for the footings depends on a number of factors, including: m The type and density of the soil; a The presence and amount of any groundwater/seepage; m Depth of cut, m Proximity of the cut to any surcharge loads near the top of the cut, such as stockpiled material, traffic loads, structures, etc. and the magnitude of these surcharges; m Duration of the open excavation; and m Care and methods used by the contractor. We recommend the following: m Protect exposed slopes from er osion by using plastic sheeting; n Limit the maximum duration of open excavations to the shortest time period possible; and m Place no surcharge loads (equipment, materials, etc.) at the top of the cut within a horizontal distance equal to the depth of the cut. Because of the variables involved, actual slopes required for stability in temporary cut areas can only be estimated prior to construction. We recommend that stability of the temporary slopes used for construction be the responsibility of the contractor, since the contractor is in control of the construction operation and is continuously at the site to observe the nature and Hart Crowser Page 13 7895 May 21, 2003 -1 condition of the subsurface. All excavations should be made in accordance with of S all local, state, and federal safety requirements. Impacts oils on Concrete Based on our experience and visual inspections of soils samples obtained from the subject site, we do not anticipate that the existing soils (existing fill or glacial soils) or imported fill will be reactive with normal concrete. IRECOMMENDATIONS FOR ADDITIONAL GEOTECHNICAL SERVICES We recommend the following: m Consult with Hart Crowser during the remainder of the design,phase of the project so that we. can refine or confirm our recommendations as more information about the project requirements becomes available, or in the event of design changes. m Retain Hart Crowser to review the final foundation and civil design plans and specifications to confirm that our geotechnical engineering recommendations have been properly interpreted and implemented into the design. n During the construction phase of the project, retain Hart Crowser to observe: Placement and compaction of structural fill including field testing of compacted fill and assessment of subgrades prior to placement of the fill; Footing subgrades; Slab -on -grade subgrades; Installation of drainage materials and systems; and Other geotechnical considerations that may arise during the course of construction. The purpose of these observations is to determine compliance with tile design concepts, specifications, or recommendations and to allow design changes in the event that subsurface condition differ from those anticipated prior to the start of construction. F:\docs�obs\7895\Edrnonds Center for the Art Report.doc Hart Crowser Page 14 7895 May 21, 2003 w w w w = w w m w w w z = w � m w m w = M��Mmm m = mm mm m � mm � X. 3 w CD cn 0 w CD CD (n —I 789500AA.cdr HEL 5/1/03 M- Fp A I p P % ......... -1-04 ii. 5i"ll � Mak"MI 9, NNW RIS! T MA -;kvfl .6i WN �A RAI CNN. 012ho. ILUMUNDS R, W, IN 3: - 9 Pals - A lie 70AV" pill ri 9 1: 1 g�, PA MWE's 7 E PTA V, A .tip 6THIA 41 'A 111HPON R1001 3RD' Mt 91s, P E.- P, -i , - - - I ie A kymil wm 411 rr �Lwi W, WIN - rL M' AV-.Wj Am "HIM A 3' fi i . a"r- 9 X4 a ST —Al h-- Site and Exploration Plan '4 A LO Exterior Face of C3. cc Existing Building BK S/W 199 BK S/W E IQ �A ZO @JK �IWWA ,(-4 B CO K S/W 51 9 E L A L IG I '41"OU Area of Proposed North Addition/Renovation 0 0) C*14 a LO -"J� . - �� - — - - —a- . A 1 A �LC514 . . i�'. 0 6'0' E 1-V- -)4- L-J HCA Area of Proposed Pj BY A '.A South Addition/Renovation 0 0 1W I cq17 co A A 0 0 VK.SlW1 Music School "S/W P A R C E L D 7 W- 254.79 K SK S/W 5077 3 C) FLC �079 4 z Source., Base map prepared from drawing pmvided by LMN Architects. HC-3 G Boring Location and Number Area of Proposed Addition CA Z§ 0 30 60 Scale in Feet -, —Aft I I IAPPENDIX A FIELD EXPLORATIONS METHODS AND ANALYSIS This appendix documents the processes Hart Crowser uses in determining the nature of the site soils. The discussion includes information on the following subjects: n Explorations and Their Location; m Auger Borings; and m Standard Penetration Test (SPT) Procedures. Explorations and Their Locations Subsurface explorations for this project consisted of four auger borings. The boring logs within this appendix shows our interpretation of the drilling, sampling, and testing data. It indicates the depth where the soils change. Note that the change may be gradual. In the field, we classified the samples taken from the explorations according to the methods presented on Figure A-1: Key to Exploration Logs. This figure also provides a legend explaining the symbols and abbreviations used in the logs. Boring Locations. Figure 2 shows the locations of our explorations, located by hand taping or pacing from existing physical features. The method used determines the accuracy of the exploration locations. Auger Borings Four auger borings, designated HC-1, H-2A, H-213, and HC-3, were drilled on April 22, 2003. The drilling was continuously observed by an engineer from Hart Crowser. Detailed field logs were prepared for these four borings. Using the SPT, we obtained samples at 2-1/2- to 5-foot-depth intervals. The boring logs are presented on Figures A-2 through A-5 at the end of this appendix. Standard Penetration Test (SPT) Procedures This test is an approximate measure of soil density and consistency. To be useful, the results must be used with engineering judgment in conjunction with other tests. The SPT (as described in ASTM D 1586) was used to obtain disturbed samples. This test employs a standard 2-inch outside diameter split - spoon sampler. Using a 140-pound hammer, free -falling 30 inches, the sampler is driven into the soil for 18 inches. The number of blows required to drive the sampler the last 12 inches only is the Standard Penetration Resistance. This resistance, or blow count, measures the relative density of granular soils and the Hart Crowser Page A-] 7895 May 21, 2003 -1 consistency of cohesive soils. The blow counts are plotted on the boring logs at their respective sample depths. Soil samples are recovered from the split -barrel sampler, field classified, and placed into watertight jars. They are then taken to Hart Crowser's laboratory for further testing. In the Event of Hard Driving Occasionally very dense materials preclude driving the total 18-inch sample. When this happens, the penetration resistance is entered on logs as follows: Penetration less than six inches. The log indicates the total number of blows over the inches number of of penetration. Penetration greater than six inches. The blow count noted on the log is the sum of the total number of blows completed after the first six inches of penetration. This sum is expressed over the number of inches driven that exceed the first 6 inches. The number of blows needed to drive the first six inches are not reported. For example, a blow count series of 12 blows for 6 inches, 30 blows for 6 inches, and 50 (the maximum number of blows counted within a 6-inch increment for SPT) for 3 inches would be recorded as 80/9. IF:\docs�obs\7895\Edmonds Center for the Art Report.doc I I 11 I I I L� Page A-2 Hart Crowser 7895 May 21, 2003 -1 Key to Exploration Logs I I I I F11 I I I I I I I I I I I I U) 7 0 C, M C U X Sample Description Classification of soils in this report is based on visual field and laboratory observations which include dens ity/consi ste n cy, moisture condition, grain size, and plasticity estimates and should not be construed to imply field nor laboratory testing unless presented herein. Visual -manual classification methods of ASTM D 2488 were used as an identification guide. Soil descriptions consist of the following: Density/consistency, moisture, color, minor constituents, MAJOR CONSTITUENT, additional remarks. Dens ity/Cons istency Soil density/consistency in borings is related primarily to the Standard Penetration Resistance. Soil density/consistency in test pits is estimated based on visual observation and is presented parenthetically on the test pit logs. SAND or GRAVEL Standard SILT or CLAY Standard Approximate Density Penetration Consistency Penetration Shear Strength Resistance (N) Resistance(N) in TSF in Blows/Foot in Blows/Foot Very loose 0 4 Very soft 0 2 <0.125 Loose 4 10 Soft 2 4 0.125 - 0.25 Medium dense 10 30 Medium stiff 4 8 0.25 0.5 Dense 30 50 stiff 8 15 0.5 1-o Very dense >50 Very stiff 15 - 30 1.0 2.0 Hard >30 >2.0 Moisture Dry Little perceptible moisture Damp Some perceptible moisture, probably below optimum Moist Probably near optimum moisture content Wet Much perceptible moisture, probably above optimum Legends Sampling Test Symbols Boring Samples Split Spoon Shelby Tube Cuttings Core Run No Sample Recovery P Tube Pushed, Not Driven Test Pit Samples M Grab (Jar) Z Bag M Shelby Tube Groundwater Observation Wells Monument Surface Seal Riser Pipe Bentonite Groundwater Level on Date or I UATD at Time of Drilling (ATD) Well Screen Sand Pack Native Material T- Groundwater Seepage (Test Pits) Minor Constituents Estimated Percentage Not identified in description 0-5 Slightly (clayey, silty, etc.) 5-12 Clayey, silty, sandy, gravelly 12-30 Very (clayey, silty, etc.) 30-50 Test Symbols GS Grain Size Classification CN Consolidation UU Unconsolidated Undrained Triaxial CU Consolidated Undrained Triaxial CD Consolidated Drained Triaxial QU Unconfined Compression DS Direct Shear K Permeability PID Pocket Penetrometer Approximate Compressive Strength in TSF TV Torvane Approximate Shear Strength in TSF CBR California Bearing Ratio MD Moisture Density Relationship AL Atterberg Limits Water Content in Percent Liquid Limit Natural Plastic Limit PID Photoionization Detector Reading CA Chemical Analysis DT In Situ Density Test .Arm as I&MCROWMA 7895 5103 Figure A-1 Boring Log HC-1 Soil Descriptions Approx. Ground Surface Elevation in Feet: 69 SOD. C06S-CtY-VjF�Tde—nse,­da­m—p io- 'mo—ist, d—ar—k brown, silty to very silty SAND with organic material layered with light gray/brown, silty, gravelly SAND to sandy GRAVEL. (FILL) Sample S-3 had limited recovery. W �Y' 11 si� gray ghtly ty, gravelly, fine SAND. Fine roots noted. Thin layer of wet, slightly silty, medium to coarse SAND noted. Bottom of Boring at 15.8 Feet. Completed 04/22/03. Depth in Feet -ro PENETRATION RESISTANCE LAB TESTS Sample A Blows per Foot 1 2 5 10 20 50 100 S-1 S-2 5 S-3 S-4 -10 S-5 S-6 -15 S-7 -20 1 2 5 10 20 50 100 Water Content in Percent AM XA HMTCROWSE-R 1 . Refer to Figure A-1 for explanation of descriptions and symbols. 2. Soil descriptions and stratum lines are interpretive and actual changes 7895 04103 may be gradual. 3. Groundwater level, if indicated, is at time of drilling (ATD) or for date Figure A-2 specified. Level may vary with time. Boring Log HC-2A Soil Descriptions Approx. Ground Surface Elevation in Feet: 61 Depth in Feet -r V -5 -10 -15 -20 1. Refer to Figure A-1 for explanation of descriptions and symbols. 2. Soil descriptions and stratum lines are interpretive and actual changes may be gradual. 3. Groundwater level, if indicated, is at time of drilling (ATD) or for date specified. Level may vary with time. PENETRATION RESISTANCE LAB TESTS Sample A Blows per Foot 1 2 5 10 20 50 MO S-1 S-2 1 2 5 10 20 50 100 & Water Content in Percent HM.TCROWSM? 7895 04103 Figure A-3 Boring Log HC-2B Soil Descriptions Approx. Ground Surface Elevation in Feet: 61 Depth in Feet k, 10 15 20 PENETRATION RESISTANCE Sample L Blows per Foot 1 2 5 10 20 50 100 S-1 1 2 5 10 20 50 100 & Water Content in Percent Arm X& LAB TESTS HM.TCROWSM? 1. Refer to Figure A-1 for explanation of descriptions and symbols. 2. Soil descriptions and stratum lines are interpretive and actual changes 7895 04103 may be gradual. 3. Groundwater level, if indicated, is at time of drilling (ATD) or for date Figure A-4 specified. Level may vary with time. Boring Log HC-3 Soil Descriptions Approx. Ground Surface Elevation in Feet: 70 _SOD. Medium dense to dense, moist, dark brown, slightly silty to silty, sandy GRAVEL to gravelly SAND with bricks and fine roots noted. (FILL) uense, moist to Damp, Drown, gravelly SAND. Fine roots noted. __qravels grade out -- — — — — — — — — — — — Very dense, moist to wet, brown -gray to gray, slightly silty to silty, slightly gravelly SAND. Bottom of Boring at 1 Completed 04/22/03. Depth in Feet -ro PENETRATION RESISTANCE LAB TESTS Sample A Blows per Foot 1 2 5 10 20 50 100 S-1 -5 S-2 S-3 -10 S-4 S-5 -15 S-6 S-7 -20 1. Refer to Figure A-1 for explanation of descriptions and symbols. 2. Soil descriptions and stratum lines are interpretive and actual changes may be gradual. 3. Groundwater level, if indicated, is at time of drilling (ATD) or for date specified. Level may vary with time. 1 2 5 10 20 50 100 Water Content in Percent RN XX HM.TCROWSER 7895 04103 Figure A-5 j®rt i _U 5 n i I STREET FILE eAD 01P J iIENT w/pUll APPROVED AS NOTED. GINE 011 IhA Date. Fvislow RECEIVED JAN 2 3 2006 ENGINEERING DIVISION VALVES FLxMJ /__4��BENCHMAR�' "C" 1 "CONC. BLOCK ELEVATI01,1 -").47* lr-90*BEMD, MJ -� "-q I PF= — C. 1. 101 G/H E&T&T,./ 1 SLEEVE, MJ CONTRACTOR TO VERIFY SIZE AND LOCATION OF P I M 7 0. ro- CONNECTION PRIOR TO m rp -t E 69.6(6 _1 ANY CONSTRUCTION. EXISTING BO 1 16M 'D 6_ I j 9 BOTTOM oj 9 IRE HYDRANT 11 GLEN — SDMH Plh6 �70 70 CONTRACTOR NOTE: -1(12"rP N\ EXISTING WATER SERVICES H E 66.7(12"ClviF E) FOR FIRE AND DOMESTIC iE 5) TO BE REPLACED. REMOVE Br-rTo,�j C9,65.5 AND REPLACE EXISTING T D U U TMETERS AND VAULTS. 4 CB c R 111vi 7 0.9 6 :E 68.2(12"CMP NW) 68-9(6"PVC E) �4" HpF E) INSTALL 2" IDOMES-n WATER METER PER CITY STD DETAIL �4/ RIM 70 ' 05 IE 6-9.0( . 8 " C P �'?. 6.1 4 V4 ---8LF,-4" D.I.P. INSTALL 1,4" CAP W 2" THREADED HOLE FOR METER SERVICE CONNECTION. '\—1,-6" DOUBLE DETECTOR CHECK ASSEMBLY PER CITY STD. E7.8 & E7.8.1 DO NOT KNOCK OUT DRAIN IN BOTTOM OF VAULT. PROVIDE A 2' WIDE BY 4' LONG x 2'DEEP WASHED ROCK TRENCH FOR LID DRAIN. 1 14 "CUT IN NEW cbRROUTioN FOR BUILDING SERVICES 1-6"x6"TEE, MJxFL 1-6"RESILIENT GATE VALVES FLxMJ 1-CONC. BLOCK 1-NIPPLE PE 1 SLEEVE, MJ 1-2" DOMESTIC WATER, SERVICE CONNECTION 43LF-2" SERVICE LINE 1,-1-h" DOMESTIC fl. IRRIGATION SERVICE Vi CONNECTION 44LF--1-)C" SERVICE LINE PER STI) DETAIL E7.6.1 REMOVE EXISTING TEE, VALVE- AND FIRE SERVICE. Iz- so F.61v Apprn--a —pla1vt, c of wApt " I OVH E&T&TV SSMH lt : I BUSH, ROED & HITCHINGS, INC.- CIVIL ENGINEERS & LAND SURVEYORS 2009 MINOR AVE. EAST, SEATTLE, WA 98102 L?06) 323-4144 FAX (206) 323-7135 tOO-935-0508 E-MAIL: INFO@BRHINC.COM /ONAL r '0MM 12/17/— _j 1 it. 20 1 JOB NO 2003019.000 SCALE 1*-20' DRAWN WPG CHECKED BDC �DATE 08/22/05 WATER REVISION # 4 EDMONDS CENTER OF THE ARTS EDMONDS WASHINGTON I m all- 0 11017-11-ck' -K P_ C: RK VALVES FLxMJ ITIBENCHIMARK "C" lr-CONC. BLOCK EVA 72. 47' 1-90'BEMD, Mul 1 SLEEVE, MJ 0 1 �/H E* & T& V CONTRACTOR TO VERIFY ... 1 SIZE AND LOCABON OF RINI 70.0; CONNECTION PRIOR TO IE 69.6(6*'CP ANY CONSTRUCTION. EXISTING BOTTOM D 6 79 EIRE HYDRANT ul GLEN SDMH RIM 70.72 CONTRACTOR NOTE: IE 66.711'112"CP N) EXISTING WATER SERVICES ic-�UMENT iE ;7)6.7(12`_kjP F.) FOR FIRE AND DOMESTIC 5) \ lwN p 5.,,- (8 P S) TO BE REPLACED. REMOVE ;ul �Cj-TTO.�j 4 55.5 0 AND REPLACE EXISTING A .�o _2 METERS AND VAULTS. - P-.K W At " Z) I CB RIM 70-96 lr6T2(12"l:MP NVI) IE 60.%6 PVC E) IE 69.0(4" PERF E) '-- INSTALL 2" IDOMESTI ce WATER METER PER PlllvI 70.05 CITY STD DETAIL !E 69-00"CP [�_?. 6.1 8LF-4'.' D.I.P. IN -STALL 1"4" CAP W 2" THREADED HOLE FOR METER SERVICE, CONNECTION. lf-6" DOUBLE DETECTOR CHECK ASSEMBLY PER CITY STD. E73 & E7.8-1 DO NOT KN-OCK'OUT DRAIN IN BOTTOM OF VAULT. PROVIDE A 2' WIDE BY 4' LONG x 2'DEEP WASHED ROCK TRENCH FOR LID DRAIN. H E&T&TV SSMH BUSH, ROED & HITCHINGS9 INC. CIVIL ENGINEERS & LAND SURVEYORS 2009 MINOR AVE. EAST, SEAT-TLE, WA 98102 (206) 323-4144 FAX (206) 323-7135 �00-935-0508 E-MAIL: INFOOS RHINC.COM NEW CONNECTION FOR BUILDING SERVICES 1,-6"x6"TEE, MJxFL 1-6"RESILIENT GATE VALVES FLxMJ 1-CONC. BLOCK E. c4=wj 1-2" -DOMESTIC WATER SERVICE CONNECTION 43LF-2" SERVICE LINE DOMESTIC IRRIGA11ON SERVICE CONNECTION 441-Fr-142"" SERVICE LINE PER STD DETAIL E7.6-1 -REMOVE EXISTING TEE,, VALVE- AND FIRE SERVICE. ra - Fsk riiA rlq I N A" /ONAL r �MIM 12/17/_ _j 1 of =201 JOB NO 2003019.000 SCALE 1.-20. DRAW14 WG CHECKED BOC DATE 08/7-2/05 WATER REVISION # 4 EDMONDS CENTER OF THE ARTS EDMONDS WASHINGTON 91% RECEIVED JAN 2 3 2006 ENGINEERING E)1141SION Edmonds Center for the Arts Traffic Impact Analysis Prepared for Edmonds Public Facilities District Edmonds, Washington Prepared by Robert Bernstein, P.E. Consulting Transportation Engineer/Planner June,2003 RECEIVED SEP - 3 2004 13UILDING DEPT. STREET FILE Ot I I Edmonds Center for the Arts Traffic Impact Analysis CONTENTS Introduction.................................................................................. I ExistingConditions ......................................................................... I Impacts of Proposed Development: Phase I ............................................ 7 Impacts of Proposed Development: Phase 2 .......................................... 13 Conclusions and Recommendations .................................................... 21 Appendix A: Traffic Counts ............................................... 11) FIGURES Figure1. Study Area ........................................................................ 2 Figure 2. Existing Traffic Volumes ....................................................... 5 Figure 3. Phase I Site Plan ................................................................. 8 Figure 4. Site -Generated Traffic Distribution .......................................... 10 Figure 5. Phase 2 Site Plan ............................................................. 14 Figure 6. Phase 2 Background Traffic ................................................... 16 Figure 7. Phase 2 Site -Generated Traffic ............................................... 17 Figure 8. Traffic Volumes with Phase 2 Development ............................... 18 TABLES Table 1. Intersection Capacity Analysis for Existing Conditions .................... 6 Table 2. Intersection Capacity Analysis with Phase 2 Development .............. 19 Robert Bernstein, P.E. Consulting Transportation Engineer/Planner F Edmonds Center for the Arts I I I I I I I I I I I I F I I I I Traff ic Impact Analysis INTRODUCTION The Edmonds Public Facilities District (PFD) is creating the Edmonds Center for the Arts (ECA) to provide a community performing arts facility and meeting space to serve the local and surrounding communities. After a process of site and development alternatives evaluation, the PFD decided to purchase and renovate the historic theater at the former campus of the Puget Sound Christian College, located on the east side of 4th Ave N, north of Daley St (see Figure 1). The prime objectives of the project are to provide a performing arts facility for community arts groups and presenters, to preserve a well -regarded historic structure, and to enhance the cultural life of the community and region. The PFD proposes to carry out the project in two phases: Phase I is the renovation of the theater and the creation of on -site parking, and Phase 2 is the addition of a meeting room (with a capacity of 500) and a parking garage. Purpose The primary purpose of this Traffic Impact Analysis (TIA) is to identify and evaluate the traffic and parking impacts of the proposed project. A secondary purpose of the TfA is to suggest potential mitigation measures for impacts. EXISTING CONDITIONS The existing conditions section contains a description of the existing facility and covers five topics: parking, area access and circulation, traffic volumes, traffic operations, and bus service. Existing Facility The 2-acre site is the original campus of Edmonds High School, and more recently, Puget Sound Christian College. There are six buildings on the site, five of which are linked together. The existing buildings, which include the original school building, a gymnasium, and the theater, cover nearly the entire site. The existing buildings currently are used for theatrical and musical performances, church services, music practice, and gymnastic and dance classes. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 2 Figure 1: Study Area V Casners 17 Glen Edmonds 9th Daley Bell 2nd e .. -71 FERRY ek 4th 6th Sunset 10 13 - ?a SR1104 T1. k M-aple 0 Traffic Signal 0 All -Way Stop [3 All -Way Stop (planned) Parking (Existing) The existing facility has virtually no off-street parking (there are six head -in spaces along the back side of the existing building on 6th Ave). Most event attendees, perforiners, and staff park on -street adjacent to the facility or in the surrounding residential neighborhood, although some do park in public and/or private lots in downtown Edmonds and walk the several blocks to the site. Access and Circulation (Existing) Roadway Configuration and Traffic Control. The street system providing access to/from the ECA site is shown in Figure 1. Traffic signals and intersections with all -way stop control also are identified in Figure 1. The ECA site is located on the east side of 4th Ave north of Daley St. Vehicular access to the site itself is on 4th Ave, Daley St, 6th Ave, and Glen St, and access to the site vicinity and the site -access streets is provided primarily by 3rd Ave and 7th Ave. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 3 Functional Classification. The City of Edmonds has classified its streets (and the state highways within the city) according to their function. The "functional classifications" are consistent with state and federal guidelines, and are used by the City to determine appropriate roadway capacity, traffic control, and access management characteristics. The City of Edmonds Functional Classification System includes four classes — "Principal Arterial ... .. Minor Arterial ... .. Collector," and "Local Access Street" — which are defined in the Comprehensive Plan as follows: * Principal Arterials provide for movement across and between large subareas and serve predominantly "through trips" with minimum direct service to abutting land uses. 0 Minor Arterials provide for movement within large subareas. Minor Arterials may provide direct access to large traffic generators (e.g., community business centers and neighborhood shopping centers), and they also serve traffic from neighborhood to neighborhood within a larger community. 0 Collectors provide for movement within the smaller subareas and from Principal and Minor Arterials to the local access streets. Collector Streets provide direct access to small traffic generators (e.g., individual retail stores, schools, and small multi -family residential developments). 0 Local Access Streets serve traffic to and from abutting land uses. The adjacent land uses on Local Access Streets are most often residential, but may also include industrial and low -volume commercial uses. Local Access Streets also include neighborhood collectors and industrial/commercial streets. The streets adjacent to the site and most streets in the site vicinity are Local Access Streets. There is a single Principal Arterial in the site vicinity: the designated SR 524 route comprising 3rd Ave, Caspers St between 3rd and 9th, and 9th Ave north of Caspers. In addition, Main St, 9th Ave south of Caspers, and 5th Ave south of Main are classified as Minor Arterials. Sidewalks and Crosswalks. Most streets in the site vicinity (3rd-7th, Caspers—Main) have sidewalks on both sides of the street. Small segments of 7th Ave, Glen St between 6th and 7th, and Sprague St and Edmonds St between 4th and 6th have a sidewalk on one side only. In addition, there are marked crosswalks across 3rd Ave at Bell, Edmonds, Daley, and 4th, and there are marked crosswalks across Bell St at 4th, 5th, and 6th. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I 11 I I I I I I I I I L� I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 4 Traffic Volumes (Existing) Intersection traffic counts (pm peak hour) were collected for key intersections in the ECA site vicinity. Counts were made at 3rd/Daley, 3rd/4th, 7th/Glen, 9th/Casper, 9th/Main, 7th/Main, 6th/Main, 3rd/Main, 3rd/Dayton, and SR 104/Dayton. The p.m. peak hour counts are compiled in Figure 2, and the count reports are attached in Appendix A. Traffic Operations (Existing) The traffic operational analysis focused on site vicinity arterial and collector intersections. The operational analysis was performed for weekday p.m. peak hour conditions, when traffic volumes are greatest and operating conditions are the most difficult. Methodology Two types of intersections were analyzed: signalized intersections and all -way -stop -controlled intersections, as described below. Siamalized intersections were analyzed using the "planning -level" procedure described in the Highway Capacity Manual. Planning -level analysis of signalized intersections provides a basic assessment of whether or not capacity is likely to be exceeded for a given set of demand volumes and geometrics. Signal timing is not considered (signal timing is assumed to be perfectly efficient), and delay and level of service are not determined specifically. The planning -level analysis is based on a "critical movement" analysis. This procedure relates the capacity/adequacy of an intersection to lane utilization. The capacity of a point where intersecting lanes of traffic cross is 1,400 vehicles per hour (vph), and the degree to which intersecting lane volumes (i.e., the "critical movements") exceed or fall short of this capacity indicates the quality of traffic operations at the intersection. When the sum of the critical movements is greater than 1,400, the intersection is considered to be 'Cover capacity." Critical movement sums between 1,200 and 1,400 indicate that the intersection is "nearing capacity," while less than 1,200 is "under capacity." For the purposes of this study, intersection capacity is considered to be adequate if the intersection operates "under capacity." Signalized intersections analyzed include SR 104/Dayton St and Main St/3rd Ave. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner 3rd 266 40 47 65 205 1 30 Main 104 112—o. 71 35 20 ') 185 133 60 1001 62 120 13 Dayton Figure 2: Existing Traffic Volumes p.m. peak hour 313 11 5 r1 — 4th 0 414 3rd 308 (o7 Daley 6 405 Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 5 18 5 3 1 1 .10 15 Daley 6 5 5 1 39 6 39 5th �as ers 14 82 / I .. I ECAJ. Gi,en/'-:.- 146 45 1 19 Edmonds 91 25 153 �4 bale'v 157 356 ..,f I CasDers 581 21 308 9th BeI14, 2nd 3ra 4th i; 6t 4. 6th 71h sunsiet Main D I n al 0 /--*S'R G4 M.We 21 38 13 1 27 -0— 159 51 227 15 20 1 19 ..,; 223 79 17 Dayton 193 16 80 16 2. 8 33 201 172 8 6th 140 ) 328 SR 104 123 13, Glen 12 6 7 121 7th 185 k, 31 28 43 24 13 222 60 86 480 — Main — 42 82 ) 286- 212---o. 90 1 118 52 ') 1 283 7th 9th I Robert Bernstein, P.E. . Consulting Transportation Engineer/Planner I I I I I I Ll I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 6 All -way stop intersection capacity is determined for the intersection as a whole — i.e., for total entering traffic — and is based on the directional split of approaching traffic (e.g., east -west vs north -south). A maximum capacity of 1,900 entering vehicles per hour is achieved when the - directional split is 50150. Capacity decreases to 1,400 for a directional split of 75/25. All -way stop intersections analyzed include Main St/3rd Ave, Main St/7th Ave, and Main St/9th Ave. (City of Edmonds plans to install the all -way stop at Main/7th in 2003, and plans to install a signal at Main St/9th Ave in 2005.) Results Traffic operational analysis. results are compiled in Table 1, and include total intersection entering volume, the critical volume sum at signalized intersections, the capacity of all -way stop intersections, and a general service level for each intersection. As shown in Table 1, all study intersections have adequate capacity for current volumes, and operate at "under capacity" conditions. Table 1: Intersection Volume and Capacity for Existing Conditions Total Critical Capacity Entering Volume') (all -way Intersection Volume (signals) stops) Service Level Main St/3rd Ave 1,180 640 under capacity Main St/7th Ave 940 1,400 under capacity Main St/9th Ave 1,400 1,900 under capacity Dayton St/SR 104 1,450 580 under capacity Dayton St/3rd Ave 960 1,850 under capacity a) "over "nearing critical volume: > 1,400 = capacity"; 1,200 - 1,400 = capacity"; < 1,200 = "under capacity" IBus Service (Existing) Community Transit operates several local bus routes within convenient walking distance of the ECA site: Route 110 (Edmonds Senior Center —Lynnwood Park -and -Ride) operates on Main Stand Dayton St; Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I � 11 I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 7 0 Route 180 (Edmonds Ferry Terminal — Lynnwood Park -and -Ride) operates on 3rd Ave and Caspers St; and * Route 630 (Edmonds Ferry Terminal — Mountlake Terrace) operates on Main St and Dayton St In addition, Community Transit operates a commuter route (Route 416, Edmonds Ferry Terminal — Aurora Village — downtown Seattle) on 3rd Ave, Main St, and 9th Ave; however, this route operates only in the peak travel direction and only during weekday peak hours, and therefore would not provide usable service for most ECA events. IMPACTS OF PROPOSED DEVELOPMENT: PHASE 1 Proposed Phase 1 Facility Phase I comprises a major renovation of the existing theater, demolition of unusable buildings on the north side of the theater, and construction of a 90-space surface parking lot where the demolished buildings had been (see Figure 3). The existing gymnasium will be retained. The renovated theater will have 750 seats, and the gymnasium will have seating for 546. The parking lot will have two accesses: one on 4th Ave and one at the Glen St/6th Ave intersection. (It is necessary to have two parking lot accesses in order to ensure that use of the lot is attractive to ECA event attendees. With a single access, the lot will be congested after events, and attendees may choose to park on -street to avoid that post -event lot congestion.) Expected use of the theater includes 105 events with an average attendance of 450 in its first year of operation. In its fifth year, the theater is expected to host 170 events with an average attendance of 500. Theater performances may be scheduled at times when the gymnasium is in use for gymnastics and dance classes; however, the PFD will not schedule high -attendance activities in the gymnasium that coincide with theater events. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner 3rd A ". 0 Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 8 Figure 3: Phase 1 Site Plan ------------------------ Daley St . ............. 6th Ave Glen St Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 9 Traffic Generation/Distribution (Phase 1) Phase I does not entail a change of use, and as a result, for the purposes of impact analysis Phase I generates no new trips. Because the renovated ECA facilities will be used more often than the existing facility, peak traffic will be generated more often (i.e., on more dates), but the site -generated volumes themselves will not increase. ECA Phase I traffic generation will be "episodic:" traffic will not be generated in similar amounts every day, as is the case with residential developments, offices, retail, etc; rather, traffic will be generated when there are events. The volume, the time -of -day, and the day -of -week of the traffic generated will vary with each event. The PFD estimates that the car occupancy of ECA event attendees will be 2.8 persons per car', and as a result, an event with average attendance (500 persons) will generate 180-190 trips to the theater before the event and 180-190 trips leaving the area afterwards. For a full house (750 persons), 270-280 trips (+/-) will be generated before and after the event. The geographical distribution of ECA tripS2 is illustrated in Figure 4. Traffic Circulation (Phase 1) The impacts of Phase I traffic will not be caused by increased site -generated volumes (use of the site does not change, and therefore volumes do not increase); rather, any impacts of Phase I traffic will be associated with changed access/egress patterns resulting from the relocation of parking for the development, including especially the provision of an on -site lot. Due primarily to the episodic character of ECA-related traffic and the dispersed nature of existing parking (entirely on -street and/or off -site), the effect of Phase I on ECA-area traffic volume and circulation cannot be precisely quantified. However, because the changed access/egress patterns associated with the installation of the new on -site parking lot affect only a limited number of vehicles (up to 90 vehicles will park on -site), it can be concluded that any impacts of the changed traffic access/egress patterns (listed below) will not be significant. I Edmonds Center for the Arts pro forma 2 The ECA trip distribution is based on 2003 p.m. peak counts of traffic inbound to the Edmonds downtown and ECA area. These volumes were deemed to best represent the routes and patterns of ECA traffic. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 10 Figure 4: Site -Generated Traffic Distribution 30% Caspers 5% :0:15% W eE 'D-alev C Glen Glen Edmonds/ B I �1�" Dalev FERRY ,1�_,43 0 4 h !th 6 h 501 sunsel 27% d 19% Main Davton SR 104 2 8 0/6: 0: :0:15% -Maple :0: 8% Impacts of Changed Traffic Access Patterns Construction of the 90-space on -site parking lot will result in the following changes to ECA traffic access/egress patterns and local traffic circulation: 0 The new lot may attract some additional traffic to the lot driveways on 4th Ave and at 6th Ave/Glen St: a total of as many as 90 additional trips may use these driveways — and 4th, 6th, and/or Glen — before and after ECA events. (It should be noted that motorists who drop off passengers at ECA and then go park cannot be considered "additional" trips, as they would drive to the site whether or not there is an on -site lot.) I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page I I • The on -site lot will not only reduce ECA-related on -street parking, but it will also reduce the amount of ECA-related traffic circulating on nearby streets searching for a parking place. • By encouraging ECA attendees to use off -site parking facilities, traffic in the immediate site vicinity would be reduced: some ECA traffic will go directly to the off -site parking areas, and ECA-related traffic on nearby streets (in search of parking) would be reduced. Parking (Phase 1) Parking Requirements Phase I does not entail a change of use, and as a result, there is no requirement to provide new off-street parking. If the planned ECA were a new facility, City off-street parking requirements for Phase I would be 160 spaces. Estimated 85th-percentile demand (the number of spaces needed to meet demand at 85% of all events) is 0.35 spaces/seat 3, or 263 spaces for the 750-seat theater. For average 4 attendance — 500 persons — parking demand would be 179 spaces IParking Management Because the PFD Board wants to provide convenient parking for ECA attendees and to minimize the impact of ECA-related parking on the streets in the surrounding neighborhood, Phase I includes a 90-space on -site parking lot. In addition, ECA will endeavor to minimize on -street parking by encouraging the use of appropriate off -site off-street parking. Use of appropriate off- street parking will be encouraged by providing clear directions to nearby public parking locations (Public Safety Complex and City Hall), and by identifying clear convenient pedestrian linkages between the public lots and ECA. [I I 1 3 Parking, ENO Foundation, Table 3-2 4 PFD estimates that the car occupancy of ECA event attendees will be 2.8 persons per car: 500 people @ 2.8/car = 179 I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 12 ECA may take other actions to help limit on -street parking: valet parking may be provided as a service to ECA attendees for events that attract large audiences, and ECA may attempt to "partner" with downtown Edmonds restaurants and businesses to encourage ECA attendees to park downtown, visit downtown establishments, and then walk to ECA. Because neither action is expected to have a significant effect on potential ECA-related use of on -street parking, neither is considered to be a primary element of the ECA parking management program. Although ECA use of on -street spaces around the site is undesirable, there are no effective or acceptable means of discouraging or prohibiting ECA use of on -street parking. Although event - related parking prohibitions may be considered on specific blocks, area -wide parking prohibitions and/or residential parking zone (RPZ) programs can be costly and constraining for local residents. Furthermore, neither the City nor the PFD can unilaterally create an RPZ around the ECA: the City's RPZ program is community -initiated (i.e., RPZs are created at the request of the community). If the community around the ECA wants an RPZ, they can apply to the City. Pedestrian Access and Circuiation (Phase 1) Pedestrian access to the ECA site is good, with sidewalks available on both sides of most area streets, and marked crosswalks on 3rd Ave (the only arterial in the immediate vicinity of ECA). 6th Ave provides a good connection to ECA to/from downtown: it has continuous sidewalks, and ECA is at least partially visible from a distance. Unfortunately however, pedestrian access between the remote public parking lots and 6th Ave is circuitous and inconvenient (e.g., although nearly adjacent to 6th, the Public Safety Complex parking lot is completely blocked from 6th — for pedestrians — by the Public Safety Complex building and the Police Dept parking/loading area). 4th Ave also provides a good connection to ECA: it has continuous (though narrow) sidewalks, and ECA is clearly visible at a distance (due to the curvature of 4th north of Daley). ECA is not visible from the remote public lots that can serve ECA off -site parking needs; therefore, clear directions to 4th are needed (V2block west on Bell from City Hall, and from the Public Safety Complex via 5th Ave to the south side of Edmonds). I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner F1 I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 13 IMPACTS OF PROPOSED DEVELOPMENT: PHASE 2 Proposed Phase 2 Facility Phase 2 will add to the renovated theater and gymnasium a structure containing an assembly hall/meeting room of 10,000 gross sq ft that can seat up to 500 people and a parking garage with 248 spaces. The structure will be placed on the footprint of the Phase I on -site surface parking lot (see Figure 5). The parking garage will have the same two accesses as the Phase I surface lot: one on 4th Ave and one at the Glen St/6th Ave intersection. (Having two accesses to ensure lot convenience and limit congestion is even more important for the 248-space garage than it is for the 90-space surface lot.) Expected use of the assembly hall/meeting room includes 78 events in its first year, increasing to 119 events in the fifth year. Events include weddings, civic events, corporate meetings, educational camps, and "special series" events. Average attendances range from 50 to 500. In the first year, the PFD expects 30 weddings with an average attendance of 500, eight civic events with an average attendance of 250, and eight special series events with an average attendance of 200. By the fifth year, the PFD expects 62 weddings, 12 civic events, and eight special series events. Traffic GenerationlDistribution (Phase 2) Like traffic generation for the Phase I theater, Phase 2 assembly hall/meeting room traffic generation will be episodic. With an estimated car occupancy of 2.0 persons per ca? for assembly hall/meeting room attendees, weddings (attendance = 500 persons) will generate 250 inbound trips before the event and 250 outbound trips after, civic events (attendance = 250 persons) will generate 125 trips before and after, and special series events (attendance = 200 persons) will generate 100 trips before and after. It should be noted that most of the high - attendance events will be weekend and/or evening events, and therefore will not generate traffic during the weekday p.m. peak period. The geographical distribution of Phase 2 ECA trips is expected to be similar to the distribution of Phase I trips (see Figure 4). 5 Shared Parking, Urban Land Institute Robeil Bemstein, P.E. Consulting Tr-ansportation Enginecr/Planner 3rd A"a Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 14 Figure 5: Phase 2 Site Plan pe N 4th Ave ..................... Anchor House ---------- m ------ Roof 1B Garden ffi Meeting Hall Theater ............. V Music Bldg Gymnasium Daley St Rom 6th Ave Glen St Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I I I I 11 I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 15 Traffic Volumes (Phase 2) Because ECA Phase 2 use is episodic like Phase I use, the Phase 2 traffic analysis could not be based on "typical conditions:" there are no "typical conditions." Instead the Phase 2 traffic analysis was based on a facility use scenario specifically devised to represent a high -attendance condition with maximum potential impact during the p.m. peak hour. (Because, as stated previously, most major events will be scheduled on weekends and/or evenings, the use scenario used for the traffic analysis will occur infrequently.) The facility use scenario used for the purposes of this analysis involves an afternoon meeting or conference that concludes during the p.m. peak hour and a theater event that begins shortly after the p.m. peak hour. The traffic generated under this scenario includes 160 exiting trips 6 and 90 entering tfiPS7. In addition, a 5% increase in background traffic (i.e., traffic unrelated to ECA) was included in the scenario. Background volumes are compiled in Figure 6, site -generated traffic volumes are compiled in Figure 7, and total traffic volumes (background plus site -generated) are compiled in Figure 8. Traffic Operations (Phase 2) The Phase 2 traffic operational analysis focused on the same site vicinity arterial and collector intersections as did the existing conditions analysis. Also like the existing conditions analysis, the Phase 2 operational analysis was performed for weekday p.m. peak hour conditions. The Phase 2 analysis was performed for the ECA use scenario described in the previous section ("Traffic Volumes"). Methodology The Phase 2 traffic operational analysis used the same methodology as the existing conditions analysis, analyzing signalized intersections using the "planning -level" procedure described previously, and by determining capacity for all -way -stop -controlled intersections as described previously. 6 200 meeting attendees departing during p.m. peak hour; average car occupancy of 1.25 persons per car 7 500 theater attendees, with half arriving during p.m. peak hour; average car occupancy of 2.8 persons per car I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 16 Figure 6: Phase 2 Background Traffic Volumes p.m. peak hour 330 10 5 20 5 5 15 10 r 1 ; 1 15 4th Daley — 5 0 5 5 1 40 435 5 40 3rd 3rd 325 5th 280 40 10 50 1 70 215 165 ..,; V,.. 30 Daley 375, Main — 101" .11 110 ) f— 5 CasDers 1115-1. 75 35 425 610 20 195 25 151 140 65 9th 1051 65 125 .j 15 Dayton 85 j le 125 155 45 20 Edmond \,j 15, S/111 25 160 Bell 2�* 1�i;�Dalev z Glen ERRY 4th 6t� 76 15 nset 10 10 7' Davton 7th SRU4 Y" Studet a 11 maple 20 5 40 25 19 15 35 15 1 25 165 30 45 1� 60 1 235 240 1� 15 r 'o -0; %1. — 505 r go 20 1 20 *-- — — .1/ r 80 15 -N to'*' 40 85 --N t— Dayton 200 —o� 15 80 300- 220 95 125 15 10 1 35 55 295 210-0. 180 10 6th 7th 9th 145 ) 345 SR 104 Robert Bernstein, P.E. Consulting Transportation Engineer/Planner Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 17 Figure 7: Phase 2 Site -Generated Traffic Volumes p.m. peak hour 3rd 25 45 Main 25 25 15 15 45 25 SR 104 15 t".. 25 r 4th 3,d (P70 Daley 40 Daley — 5th 25 Casi)ers R Caspers 50 9th ECA6. Glenr.�' Imondsh 10 Dalev IeV 29d 3) Glen 7t� 4th 6th 0 �Ih 25 45 25 t.\_M�ln 7th n MWe 45 25 30 10 15 6th 7th 9th Robert Bernstein, P.E. Consulting Transportation Engineer/Planner Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 18 Figure 8 Traffic Volumes with Phase 2 Development p.m. peak hour 3rd 305 40 95 70 215 1 30 Main 135 115 75 35 20 210 165 6 5 1051 65 125 ,I \.., 15 tvtnn 330 25 30 4th 0 435 3rd 325 r 80 L Daley 1 /016' 45 425 85 —',-ECA 155--o. 45 1 20 Edmonds 25 175 20 5 5 15 -10 I \,. 15 Daley 5 — /011, 1 5 5 5 40 40 5th Caspers_, 7'.- :1W Bell 2nd 3 :ERRYqk 4th T 6i� §�h S.Z Main Davton SR)04 i Maole 20 40 15 25 165 285 15 50 20 20 `-I \" 235 80 15 Dayton — 200 15 80 15 toe. 1 10 35 210 145 180 10 370 6th SR 104 165 4001 Ca,,e,—, 25 -�5 325 9th 125 25, .11, 1 Glen — — 40 55 35 1 25 195 15 35 30 90 250 85 90 1-1/ 505 — Main — 40 85 ) e- 300 - 250---o. 95 125 70 ) 295 7th 9th I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 19 IResults Phase 2 traffic operational analysis results are compiled in Table 2, and include total intersection entering volume, the critical volume sum at signalized intersections, the capacity of all -way stop intersections, and a general service level for each intersection. As shown in Table 2, all study intersections have adequate capacity for facility use scenario volumes, and operate at "under capacity" conditions. Table 2: Intersection Volume and Capacity with Phase 2 Development Total Critical Capacity Entering Volume8) (all -way Intersection Volume (signals) stops) Service Level Main St/3rd Ave 1,345 700 under capacity Main StOth Ave 1,050 1,400 undercapacity Main St/9th Ave 1,530 1,900 under capacity Dayton St/SR 104 1,585 625 under capacity Dayton St/3rd Ave 1,045 1,800 under capacity a) critical volume: > 1,400 = "over capacity"; 1,200 - 1,400 "nearing capacity"; < 1,200 = "under capacity" Traffic Circulation (Phase 2) Phase 2 will generate traffic volumes equal to or less than the volume generated by Phase 1: a wedding in the assembly halUmeeting room that draws an attendance of 500 will generate the same amount of traffic as a theater event attended by 500. As a consequence, Phase 2 will not result in increased ECA-related traffic volumes; however, with the completion of Phase 2, ECA events that generate traffic will occur more frequently. In addition, there will be Phase 2 traffic impacts associated with changed access/egress patterns resulting from the expansion of on -site parking capacity (i.e., replacement of the 90-space surface lot with a 248-space garage). I I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner 11 I I I I I I I I I I I I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 20 Impacts of Changed Traff ic Access Patterns Construction of the 248-space garage will result in the following changes to ECA traffic access/egress patterns and local traffic circulation: 0 The garage will attract additional traffic to the driveways at 6th Ave/Glen St and on 4th Ave: a total of as many as 160 additional trips (in addition to the 90 that used the Phase I surface lot) may use these driveways — and 4th, 6th, and/or Glen — before and after ECA events. 0 Insofar as the garage will have adequate capacity to accommodate the entire parking demand associated with events at the theater or the assembly hall/meeting room, the garage will have the capability to eliminate ECA-related on -street parking and the associated traffic circulating on nearby streets searching for a parking place. (If and when assembly hall/meeting room and theater events are scheduled concurrently, there may be "overflow" parking demand that may need to accommodated in public lots or on - street.) 0 When the garage "empties" after an ECA event, exiting traffic is likely to use all streets available to it enroute to 3rd Ave, 5th Ave, 7th Ave, and Main St, the primary arteries leading out of the ECA vicinity: garage -exiting traffic will use 4th, 5th, 6th, Daley, Glen, Edmonds, and Bell in a more -or -less uniform manner. Parking (Phase 2) Parking Requirements. The City off-street parking requirement for Phase 2 (assembly hall/meeting room) is 187 spaces. This requirement will be met, with a surplus, by the 248-space 8 garage included in Phase 2. Estimated demand is 0.5 spaces/seat , or 250 spaces for full attendance (e.g., a wedding attended by 500 persons). Parking Management. The parking management measures instituted to support operation of the theater (Phase 1) will be continued. In addition, the ECA will attempt to minimize the number of occasions on which high -attendance assembly hall/meeting room and theater performance events are scheduled concurrently. 8 Shared Parking, Urban Land Institute I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I I I I I I Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 21 Pedestrian Access and Circulation (Phase 2) Pedestrian access issues, needs, and opportunities are the same for Phase 2 as for Phase 1. CONCLUSIONS, AND RECOMMENDATIONS 1. Phases I and 2 of the project will have no traffic- or parking -related significant adverse impacts, and as a result, no mitigation measures are required. 2. 4th Ave should serve as the designated primary ECA walk route to/from public lots and downtown. 4th Ave is stop -controlled along the entire walk route to ECA: 4th has a stop sign and the cross -street is uncontrolled at Bell, Edmonds and Daley. For pedestrian safety and convenience, the stop control should be reversed (give 4th the right-of-way and stop Bell, Edmonds and Daley) or all -way stop control should be installed at these three intersections. In addition, the pedestrian crossings at both Edmonds and Daley are unmarked and very wide. Crosswalk markings should be provided at Edmonds and Daley. Curb extensions would be a useful enhancement that can be considered in the future. I I I I I I I I 3. Traffic control and circulation improvements, on -street parking revisions, and pedestrian enhancements in the ECA vicinity should not be identified and developed through an individual development like the ECA project; rather, the City should prepare a comprehensive access, circulation, parking, and redevelopment plan for the area north of downtown. 4. The ECA should minimize the number of occasions on which high -attendance events are scheduled concurrently in the theater and assembly hall/meeting room. I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner I F�, I I I I I I I I I I I I I I 11 I Appendix A: Traffic Counts Edmonds Center for the Arts Traffic Impact Analysis June,2003 Page 22 I Robert Bernstein, P.E. Consulting Transportation Engineer/Planner TCTraffic Count Consultants, 13623 184th Avenue NE, Woodinville, WA 98 Phone: (425) 861-8866 FAX: (425) 861-8877 Turning Movement Diagram 721 > N 4 Daley Street 27- 4 7 2 Check In: 734 726 Out: 734 %HV PHF Intersection: Daley Street @ 3rd Avenue EB n/a n/a Location: Edmonds WB 0.0% 0.46 ate of Count: Wed 4.16.03 NB 2.2% 0.77 Peak Period: 4:45 P - 5:45 P SB 2.6% 0.91 Checked By: Kg Intersection 2.3%10.84 repared For: Robert Bernstein, P. E. 03018-00lp I I I 11 I I I I I I I I I 11 I I I TC 2 Traffic Count Consultants, Inc. 13623 184th Avenue NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Vehicle Volume Summary Daley Street @ 3rd Avenue Edmonds Date of Count: Checked By: Wed 4.16.03 Kg Time Interval From North on (SB) 3rd Avenue From South on (NB) 3rd Avenue From East on (WB) Daley Street From West on (EB) n/a Interval Total Ending at T L S R T L S R T L S R T L S R 4:15 P 2 1 81 0 1 0 58 4 0 1 0 2 0 0 0 0 147 4:30 P 2 0 79 0 2 0 83 2 0 0 0 2 0 0 0 0 166 4:45 P 4 0 80 0 2 0 65 4 0 2 0 1 0 0 0 .0 152 5:00 P 3 0 86 0 2 0 76 1 0 0 0 0 0 0- 0 0 163 5:15 P 2 1 78 0 3 1 0 130 3 0 4 0 2 0 0 0 0 218 5:30 P 1 1 81 0 1 0 84 1 0 1 2 0 2 0 0 1 0 0 171 5:45 P 2 2 63 0 3 0 115 1 0 1 0 0 0 0 1 0 0 182 6:00 P 2 0 73 0 2 0 57 3 0 4 0 2 0 0 0 0 139 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 18 5 621 0 16 0 668 19 0 14 01 11 0 0 1 0 07 1338 4:45 P to 5:45 P Peak Hour Summary Total 8 4 308 0 9 1 0 1 '405 1 6 0 1 7 1 0 1 4 0 0 0 0 734 Approach 312 411 11 0 734 %HV 3% 2% 0% n/a 2% PHF 0.91 0.77 0.46 n/a 0.84 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jurn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein, P. E. k03uOl 8-001 pi I J- 'L P L Comments (more is betler)� any significant traffic event? ON YOUR MAP: I Compass (especially North) 2 Lane directions 3. Where you sat 4. Stop sign or signal 5 LABELSTREETS 6. Landmarks on corners X C'� TCTraffic Count Consultants, 13623 184th Avenue NE, Woodinville, WA 98 Phone: (425) 861-8866 FAX: (425) 861-8877 Turning Movement Diagram 7 3 Nl- > 4th Avenue N A 5 17 z Check In: 744 728 Out: 744 %HV PHF Intersection: 3rd Avenue N @ 4th Avenue N EB n/a n/a Location: Edmonds WB 0.0% 0.50 ate of Count: Wed 4.16.03 NB 2.2% 0.86 Peak Period: 4:45 P - 5:45 P SB 2.2% 0.89 Checked By: Kg Intersectionj 2.2%10.94 repared For: Robert Bernstein, P. E. k03 uO I 8-002p I I I I I I I I I I I I I I I I I TC 2 Traffic Count Consultants, Inc. 13623 184th Avenue NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Vehicle Volume Summary 3rd Avenue N @ 4th Avenue N Edmonds Date of Count: Checked By: Wed 4.16.03 Kg Time Interval From North on (SB) 3rd Avenue N From South on (NB) 3rd Avenue N From East on (WB) 4th Avenue N From West on (EB) n/a Interval Total Ending at S R T L S R T L S R T L S R 4:15 P 1 3 87 0 1 0 68 0 0 0 0 5 0 0 0 0 163 4:30 P 3 4 77 0 3 0 74 1 0 1 0 2 0 0 0 0 158 4:45 P 5 5 80 0 2 0 63 0 0 3 0 2 0 0 0 0 153 5:00 P 1 3 88 0 2 0 95 0 0 0 0 1 0 0 0 0 187 5:15 P 2 1 79 0 3 0 118 0 0 0 0 0 0 0 0 0 198 5:30 P 2 3 80 0 2 0 81 0 0 0 0 2 0 0 0 0 166 5:45 P 2 4 66 0 2 0 120 0 0 1 0 2 0 0 0 0 193 6:00 P 2 2 71 0 2 0 49 0 0 0 0 3 0 0 0 0 125 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 18 25 627 0 17 0 668 1 0 5 0 17 0 0 0 0 1343 4:45 P to 5:45 P Peak Hour Summary Total 7 11 313 0 9 0 414 1 0 0 1 1 0 1 5 0 0 0 1 0 744 Approach 324 414 6 0 744 %HV 2% 2% 0% n/a 2% PHF 0.89 0.86 0.50 n/a 0.94 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 Nvheels) L= Left -Turn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein, P. E. 03018-002p I Apr-16-03 18:19 Monika Ch. Oliveri El Olvw A1 Ad Y. 001-F425-823-2297 P. 02 I TC' Traffic Count Consultants, Inc. 13623 184th Avenue NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Turning Movement Diagram 269 z 53 �3 Glen Street 13 123 38 12 6 t- L- —J 257 Intersection: Glen Street @ 7th Avenue N Location: Edmonds Date of Count: Tue 4.8.03 Peak Period: 4:45 P - 5:45 P Checked By: FH Prepared For: Robert Bernstein 7 1 121 528] Check In: 282 Out: 282 %HV PHF EB 0.0% 0.90 WB n/a n/a NB 1.6% 0.89 S13 0.7% 0.87 IntersectionF-1 . 19/6 TO.94-j K03uO1 11 I I I I I I I I I I I I I I I I TC' Traffic Count Consultants, Inc. 13623 184th Avenue NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Vehicle Volume Summary Glen Street @ 7th Avenue N Edmonds Date of Count: Checked By: Tue 4.8.03 FH Time Interval From North on (SB) 7th Avenue N From South on (NB) 7th Avenue N From East on (WB) n/a From West on (EB) Glen Street Interval Total Ending at T L S R T L S R T L S R T L S R 4-1.6 ',0 "0. �19.' �"4 �_O 0 :,,28j']:, o o o 0 7 0 0 58, 4:30 P 0 0 16 4 0 0 24 0 0 0 0 0 0 2 0 2 48 4 46 P 1 0 12 1 0 0 22 0. 0 0 0 0 0 1 0 1 1 37 5:00 P 0 0 34 5 0 1 30 0 0 0 0 0 0 4 0 1 1 75 5:15 P-1 1 6 36 2 29 0 0 0 0 31 .6: 2 74 5:30 P 0 0 24 5 1 2 34 0 0 0 0 0 0 3 0 0 0 68 545P 0 0 29 1 1 2 28 0 0 0 0 0 0 2 0 3 3 65 6:00 P 1 0 19 1 0 1 28 0 0 0 0 0 0 4 0 0 53 6 15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 6.0 P. 0 0 0' 0 6 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 3 0 189 23 2 8 223 0 0 0 0 0 0 26 0 478 4:45,P. to '5:45,P:_ ,,,Peak Hour Summ ry� a Total 1 0 123 13 2 7 121 1 0_ 0 0 0 0 0 12 0 6 282 Approach 136 128 0 18 282 %HV 1% 2% n/a 0% 1% PHF 0.87 0.89 n/a 0.90 0.94 Legend: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jurn S= Straight R= Right-Tum HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Prepared For: Robert Bernstein K03018-0034 I comments: �jA C-6-5 7±A A��, �PoaT-14 9F M I TC' Traffic Count Consultants, Inc. J k Main St 559 Turning Movement Diagram 707 104 112 20 47 1 266 1 65 Intersection: Main St @ 3rdAve Location: Edmonds Date of Count: Wed 4.15.03 Peak Period: 4:00 P - 5.-00 P Checked By: FH Prepared For: Robert Bernstein 13623 184th Ave NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-887 F�29] 71 1 185 1 35 2791 607 Main St 40 205 30 —48-7 Check In: 1180 Out: 1180 %HV PHF EB 0.0% 0.62 WB 0.0% 0.85 NB 2.4% 0.90 SB 1.6% 0.90 Intersection, 1.1% , 0.89 K03u01 I I I I TC' Traffic Count Consultants, Inc. 13623 184th Ave NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Main St @ 3rd Ave Edmonds Vehicle Volume Summary Date of Count: Checked By: Wed 4.15.03 FH Time Interval From North on (SB) 3rd Ave From South on (NB) 3rd Ave From East on (WB) Main St From West on (EB) Main St Interval Total Ending at T L S R T L S R T L S R T L S R 1�4:115 P 0 20. 57 .14 2 22 40 7 0 47 .9 0. 39 35 5 4:30 P 2 20 72 13 1 7 51 9 0 7 51 10 0 10- 12 4 266 4:45 P 2' 11 72' 7:�' 2 24 39 11 0 11 ::61 9;,� 0 11 3 :,,281 5:00 P 2 14 65 13 2 18 55 8 0 6 46 12 0 44 43 8 332 .515 P 9 63 11 1 7 58 3 0 11., 40 8 0 12 17 5 244 5:30 P 2 6 66 8 2 9 50 7 0 8 40 6 0 28 2-7 —8 263 -5:45:P 1 8.'. 44, 10. 1 13 47 3 0 11 29-, 18 0 18 28 2 6:00 P 2 4 41 8 1 9 44 11 1 5 30 6 0 5 19 6 188 ��:.'6:115 P 0 0 0 0 0 0 0 0 0 0 0 011 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6-45.11P '.'0 0 0. 0 0 0'. 0 0 0- 0 0 0 0 '0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 13 480 84 12 109 384 4 59 rl 65 344 1 78 __Oj 1 167 MR 41 2106 .-Od P .4. t 5 00 P Hdbi S 01. urprnary: Total 6 65 266 1 47 7 71 185 35 0 1 3 1 205 1 40 0 104 112 20 1180 Approach 378 291 275 236 1180 %HV 2% 2% 0% 0% 1% PHF 0.90 0.90 0.85 0.62 0.89 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jurn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein K03uO1 8-004pi I a - : , 4,0-4 ' I 31HIS lots, M d d'J V4 :1 1'� CI-' -)177-F/ -WIT19�tj 01 ell; I TCTraffic Count Consultants, Inc. 13623 184th Avenue NE, Woodinville, WA 98072 Plione: (425) 861-8866 FAX. (425) 861-8877 Turning Movement Diagram z 173 T, q- > 71 r102 I Main Street [28 431 Main Street 77' 836 869 328 Check In: 939 Out: 939 %HV PHF Intersection: Main Street @ 7th Avenue N Ell 2.7% 0.76 Location: Edmonds WB 0.2% 0.67 Date of Count: Wed 4.16.03 NB n/a n/a Peak Period: 4:4 5 P - 5:45 P SB 0.0% 0.85 Checked By: Kg Intersection. 1.1% 0.77 Prepared For: Robert Bemstein, P. E. k03018-005p I I I I I I I I I I I I 11 I I I I I TIC 2 Traffic Count Consultants, Inc. 13623 1841h Avenue NE, Woodinville, WA 98072 Plione: (425) 861-8F66 FAX: (425) 861-8877 Intersection: Location: Main Street @ 7th Avenue N Edmonds Vehicle Volume Summary Date of Count: Checked Ily: Wed 4.16.03 Kg Time "' terval From North on (SB) 7th Avenue N From South on (NB) n/a From East on (WB) Main Street From West on (EB) Main Street Interval Total Ending at T L L S R T L S R T L S R T L S R 4:15 P 0 6 6 0 8 0 0 0 0 0 0 50 10 2 5 71 0 150 4:30 P 0 1 4 14 E 0 10 0 0 0 0 0 0- 61 16 2 8 -99 0 168 4:45 P 0 11 1 1 0 9 0 0 0 0 0 0 58 5 1 8 71 0 162 5:00 P 0 11 0 7 0 0 0 0 0 0 187 14 2 10 75 0 304 5:15 P 0 7 0 6 0 0 0 1 0 0 1 0 1 183 16 1 13 53 0 278 5:30 P 0 10 0 9 0 0 0 0 0 0 54 10 3 10 59 0 152 5-45 P 0 15 0 6 0 0 0 0 1 0 56 20 3 9 99 0 205 6:00 P 0 3 0 11 0 0 0 0 1 0 59 18 3 5 67 0 163 6:15 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 77 0 66 on 0 109 17 68 554, 0 1582 4:45 P to 5:41, P Peak Hour Summary Total 0 1 43 0 28 0 0 0 1 1 0 480 60 9 1 42 286 0 939 Approach 71 0 540 328 939 %HV 0% n/a 0010 30,o 10,10 PHF 0.85 n/a 0.67 0.76 0.77 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left -Turn S= Straight R= Right-Tum HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Higliest 15 rninutes)) Robert Bernstein, P. E� k03,,018-005pl I -K03 .... ........ ISOM r'l la a liq BWQ- alovi 10 a1Q1Wj Cop aqrki.:! I TC' Traffic Count Consultants, Inc. 4p- 41 Main St 682 Turning Movement Diagram 82 212 52 24 1 185 1 13 13623 184th Ave NE, Woodinville, WA 98072 1 Phone: (425) 861-8866 FAX: (425) 861-887 90 1 283 1 118 F491] -F 8' L4 Intersection: Main St @ 9th Ave Location: Edmonds Date of Count: Thu 4.10.03 Peak Period: 5:00 P - 6:00 P Checked By: FH Prepared For: Robert Bernstein Main St 31 222 86 ---F-6-8L2 Check In: 1398 Out: 1398 %HV PHF EB 2.9% 0.80 WB 1.8% 0.94 NB 0.4% 0.90 SB 0.0% 0.84 IntersectionF1 —39/. 0.95 K03u018-006 I �11 I I I I I I TC' Traffic Count Consultants, Inc. 13623 184th Ave NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Main St @ 9th Ave Edmonds Vehicle Volume Summary Date of Count: Checked By: Thu 4.10.03 FH Time Interval From North on (SB) 77F 9th Ave From South on (NB) 9th Ave From East on (WB) Main St From West on (EB) Main St Interval Total Ending at T L S R T L S R T L S R T L S R 415 P 0, 0 34 5 3 '29 72 24 4 23 62 10 2 5 59 '18 341, 4:30 P 0 1 40 9 0 '19 67 26 0 16 46 5 1 12 44 13 298 4�4.5 P 1 2 47 3 1 18 76 35 1 20 52 6 2 13 46 11 329 5:00 P 0 1 38 5 0 1 23 56 38 1 30 64 8 3 12 51 13 339 :515 P 0- 1 40 5 1 18 74 33 1 19 67 A 1 18 77 13 369 5:30 P 0 2 54 10 0 25 71 20 1 22 50 4 3 25 36 11 330 -j I 5:45�P' 0 6 41 3 1 22 86 29 1 20 '53 12' 2 21 51 11 355:1 6:00 P 0 4 50 6 0 25 52 36 3 25 52 11 4 18 48 1 17 344 _P1 5 p 0 0 .0 0 0, 0 0 .0 0 0' 0 1 0.. 0 0 0 0- 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,45; P" 0 On: 0 0" 0 0 0 0 0 0. 0 0 0 0 .-0 0 0, 7:00 p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 1 17 1 344 1 46 1 6 1 179 1 554 1 241 1 12 60 18 107 2705 6:00 P. to 6:66P::' Pe6lkH6u�Sd mmary' A Total 0 13 1 185 1 24 2 90 283 M 6 1 86 222 31 10 82 212 52 1398 Approach 222 491 339 346 1398 %HV 0% 0% 2% 3% 1% PHF 0.84 0.90 0.94 0.80 0.95 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jurn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein 1<03018-006pi I I Dalets o; move inia,suclior, ines l"lease Pick dnCI PISCR ic show your v3um configurejon: thesit symbols: Sueet Street Nelmo StreelName West JA East "Ctt �3 —�&T —.-M Street Name South -4 _-4 /V � j ev 3 .,-C) 1(? - 0C) & p I TC' Traffic Count Consultants, Inc. Turning Movement Diagram Intersection: Caspers St @ 9th Ave Location: Edmonds Date of Count: Thu 4.10.03 Peak Period: 4:45 P - 5:45 P Checked By: FH Prepared For: Robert Bernstein 13623 184th Avenue NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Check In: 1432 Out: 1432 %HV PHIF EB 1.2% 0.77 WB n/a NB 2.2% -n/a 0.81 SB 1.4% 0.83 Intersection, 1.5% 1 0.94 K03uO1 I I I I I I I I I I I I I I I I TC' Traffic Count Consultants, Inc. 13623 184th Avenue NE, Woodinville, WA 980 72 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Caspers St @ 9th Ave Edmonds Vehicle Volume Summary Date of Count: Checked By: Thu 4.10.03 FH Time Interval From North on (SB) Caspers St From South on (NB) 9th Ave From East on (WB) n/a From West on (EB) Caspers St Interval Total Ending at T L S R T L S R T L S R T L S R 4.15 P 0 0 35 82 1 5 56 0 0 0 0. 2 99, 0':�� 9 286-_ 4:30 P 0 0 33 88 1 6 70 0 0 0 0 0 4 139 0 4 340 4 45 P 6 45' 86 2 3 83 0 0' 0 0 6 3 100 0 3 3201:, 5:00 P 1 0 42 110 0 5 62 0 0 0 0 0 3 104 0 1 324 0 30'­ 86 3 '73 b 0 0 1. 0 0 'igi 6 4 381 5:30 P 3 0 43 83 1 0 80 0 0 0 0 0 1 134 0 10 350 5:45 P 1 0 36 83 3 7 93 0 0. 0 0 0 2 152 0 6 V7 6:00 P 1 0 53 86 4 6 63 0 0 0 0 0 2 108 0 7 323 '0' 0, 0 0 0 0 0 0 o �6 o 0 0: 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 45 .0 0 0 0 0, 0 0 0 0 0 0 0 0 0 b 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 8 0 317 698 15 35 580 0 0 0 0 IS 1027 0 44 2701 t� 4;46 P: to­�.::1.6.-46P:: Peak- Hour Suirrimary Total 7 0 151 356 7 15 308 0_ 0 0 0 0 7 581 0 21 1432 Approach 507 323 0 602 1432 %HV 1% 2% n/a 1% 1% PHF 0.83 0.81 n/a 0.77 0.94 Legend: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jurn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Prepared For: Robert Bernstein 1<03018-007p I I rA MrWft M OM j$ t mr a arly significant traffic ever(t? ON YOUR MAP: I. Conpms (empo=my mom) 2. Lsm dbectb 3. Whom you SM 4. Stop slon or signil 5. LABIEL STREETS 6. Landrneft On CWrW5 A A6. YT/ ,7 ro A VS TC2 Traffic Count Consultants, 13623 184th Ave NE, Phone: (425) 861-8866 Woodinville, WA 98072 FAX: (425) 861-8877 Turning Movement Diagram 149 z Main Street 1131 21 2711 Main Street 38 A 159 406 51 548 17 193 3007 1 8 0._� I 16 33 80 Check 209 In: 656 Out: 656 %HV PHF Intersection: Main Street @ 6th Avenue N EB 0.0% 0.94 Location: Edmonds WB 0.0% 0.91 Date of Count: Wed 4.16.03 NB 0.0% 0.90 Peak Period: 4:15 P - 5:15 P SB 0.0% 0.69 Checked By: Kg Intersection 0.0%. 0.92 Prepared For: Robert Bernstein, P. E. k03uO 18-0081) I I I I I I I I I I I I 11 I I I TC2 Traffic Count Consultants, Inc. 13623 184th Ave NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Vehicle Volume Summary Main Street @ 6th Avenue N Edmonds Date of Count: Checked By: Wed 4.16.03 Kg Time Interval From North on (SB) 6th Avenue N From South on (NB) 6th Avenue N From East on (WB) Main Street From West on (EB) Main Street Interval Total Ending at 7— T L S R T L S R T L S R T L S R 4:15 P -0 3 .3 5 0 7 2 18 .,0 7- 19 40 0 1 50 ;150 -,A 4:30 P 0 3 5 7 0 8 5 20 0 20 44 2 0 2 53 3 172 4:45 P 0' �5. .3. 1 0 2 7 24 01' '4 401� I 1' 0 7 4T� A--5 2 5:00 P 0 6 7 1 2 0 3 9 15 0 11 39 9 0 6 45 2 154 5. �15 P 13 6 3 0 3 12 21 0 16 36 1'6 0 2 48 2 .178 530 P 0 to 4 1 0 5 10 18 0 14 43 13 0 4 36 6 164 5�45 P 0, 12 7 0 0 2 10 13 011-, *110 26 13., 0 5 43 5 1+6.---- 6:00 P 0 10 10 4 0 4 12 10 0 8 42 10 0 9 48 1 168 "6:15 �P` 0:'' 0 0 0 0 0 0 0 "'0 0 "0 *0 0 0 to;, .11". .0 60:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 6:45'P 0, 0. 0 0 0 0 0 0 lo� 0 :' � 01 1 0 0, .0, 0 ;40 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 0 62 45 23 0 34 67 139 0 102 1 310 1 75 0 36 370 21 1 1284 4:15 P to 5:15 P Peak Hour Summary Total 0 1 27 21 1 11 0 16 1 33 1 70 0 1 51 159 1 38 0 1 17 193 1 8 656 Approach 61 129 248 218 656 %HV 0% 0% 0% 0% 0% PHF 0.69 0.90 0.91 0.94 0.92 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left -Tum S= Straight R= Right-Tum HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volurne / (4*Highest 15 minutes)) Robert Bernstein, P. E. 03018-008pl I 'KO�5 tt C) 18 - 000 Comments (more is better): any significant traffic event? ON YOUR MAP: 1, Compass (especially North) 2. Lane directions 3. Where you sal 4. Stop sign or, signal 5. LABEL STREETS 6. Landmarks on corners 4t� &L WA I TC' Traffic Count Consultants, Inc. 13623 184th Ave NE, Woodinville, WA 98072 1 Phone: (425) 861-8866 FAX: (425) 861-887 Turning Movement Diagram 72 F F- F 5o] Daley St 3 18 1 1 Daley St 5 10 3 5 15 7- 15- 6 5 6 Intersection: Daley St @ 6th Ave Location: Edmonds Date of Count: Wed 4.9.03 Peak Period: 5:00 P - 6:00 P Checked By: FH Prepared For: Robert Bernstein 5 1 39 39 F83 Check In: 152 Out: 152 %HV PHF EB 0.0% 0.47 WB 0.0% 0.68 NB 0.0% 0.72 SB 0.0% 0.69 Intersection, 0.0% , 0.86-1 K03018-00 I I TC' Intersection: Location: Traffic Count Consultants, Inc. Phone: Vehicle Volume Summary Daley St @ 6th Ave Edmonds 13623 184th Ave NE, Woodinville, WA 98072 (425) 861-8866 FAX: (425) 861-8877 Date of Count: Wed 4.9.03 Checked By: FH Time Interval Ending at From North on (SB) _7_F 6th Ave From South on (NB) 6th Ave From East on (WB) Daley St From West on (EB) Daley St Interval Total T L S R T L S R T L -S R T L S R -.4.115 P 0 0 41 0 0 .11 7 3 0 3 1 0. 1 0 1 1 21 4:30 P 0 0 7 0 0 0 10 4 0 2 3 0 0 3 4 1 3 4 4:415:P 0 .0. 2 0 0 T 6' 2 0 3 4 11 -01 �3 0 1.: 5:00 P 0 0 3 0 0 1 1 14 7 0 4 2 0 0 0 3 3 37 �5:45 P 0 0 6 0 0 3 9 10 0 4 4 3 0 1 1 3 �:44 5:30 P —P, 0 1 6 1 0 1 8 7 0 1 3 0 0 0 1 - 0 29 J77 � � 0 0 4 1 '0 0 8 8 0 6 3 0 0 5 3 1 6:00 P 0 0 2 1 .0 1 14 14 0 4 0 2 0 0 0 2 40 P' '0' 0 0 0 0 0 0 0 0 0 0 .0 0 .0 0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '0 0 0 0 0 0 0 0 0:::, 0 0 0� 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 Total Survey 0 1 34 3 0 8 1 76 27 20 6 1 12 1 13 12 267 5,100 Pealk Hour'S u, m m, ary:,, F!:R: Total 1 7-18 3— 0 5 39 39 0___F 1-5 0 5 0 6 5 6 152— Approach 22 83 30 17 152 %HV 0% 0% 0% 0% 0% PHF 0.69 0.72 0.68 0.47 0.86 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jurn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein 1<030118-009pi I I Defete or move inte;9ection; nes Pligetse pick ano plekce to show ycur couril mnfiguratiun: these symbols: Street Nome Street N�ome Street Name we &I %A East ST� 47A r StreatName South `4 E:] "0 � � �!O -;� -0 1,0 .-0 I TC' Traffic Count Consultants, Inc. Dayton St 518 Turning Movement Diagram 590 82 146 25 13623 184th Ave NE, Woodinville, WA 98072 1 Phone: (425) 861-8866 FAX: (425) 861-887 T rT25 i 100 1 133 1 62 Intersection: Dayton St @ 3rd Ave Location: Edmonds Date of Count: Wed 4.15.03 Peak Period: 4:30 P - 5:30 P Checked By: FH Prepared For: Robert Bernstein 45 1 153 1 19 F217] 388 Dayton St 60 120 13 F-42o Check In: 958 Out: 958 %HV PHIF EB 5.9% 0.80 WB 5.7% 0.89 N13 1.4% 0.90 SB 2.0% 0.84 Intersection, 3.7% , 0.94 K03018-010 I I TC' Traffic Count Consultants, Inc. Phone: 13623 184th Ave NE, Woodinville, WA 98072 (425) 861-8866 FAK (425) 861-8877 Intersection: Location: Dayton St @ 3rd Ave Edmonds Vehicle Volume Summary Date of Count: Checked By: Wed 4.15.03 FH Time Interval From North on (SB) ___T 3rd Ave From South on (NB) 3rd Ave From East on (WB) Dayton St From West on (EB) Dayton St Interval Total Ending at T L S R T L S R T L S R T L S R 4;15.P-. 1 13 43 17 3 7 28, -11 5 2 33 .16 6. 19 39 .10 .238.� 4:30 P 1 13 42 16 1 9 42 6 3 5 22 12 4 15 22 8 212 4-45_P 1 17 3S' -18., 2 1.0, 37 -7 2 4 .30 .15� 4 21 38 2 234 5:00 P 2 13 48 27 0 13 43 4 2 0 28 15 2 20 25 10 246 5:15 P Z 21 28 25 0 11 41 3 4 5 25 17: 4 29 1,.',41 .9 255 5:30 P 1 11 22 30 1 11 32 5 3 4 37 13 5 12 42 4 223 :5A5 P --3: 16� 37 25 0 .17 26 `6 2 �':'3 27 15 3 17 34', 6 229 6:00 P 2 10 20 22 0 4 34 5 2 3 17 8 4 25 36 3 187 .15 R 0 0 0 0 0 0 0 0 ­0 1 0 0 0 0 0 0 .0 0 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6:45 P 0 0 0 0 0' 0 0 0 :.0 0. 10". 0 0. 0 0' 0.. '0. 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 13 114 275 1 180 7 1 82 283 1 47 23 26 219 111 32 158 277 52 1824 4:Ml? S.:30'P; P6ak44q�'"'U::"r'' t.umm a­r'y" Total 6 62 133 100 3 45 1 153 1 19 11 13 120 60 15 82 146 25 958 Approach 295 217 193 253 958 %HV 2% 1 % 6% 6% 4% PHF 0.84 0.90 0.89 0.80 0.94 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left Jum S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein K03uOl 8-01 Opi I I Zt, Comments (more is better): any significant traffic event? ON YOUR MAP: I. Compass (especially Norl-h) Z Lane directions 3. Where you set 4� SfOP sign or signal 5. LABEL STREET$ ;, brp 6. Landmarks on corners -c"O �uf + I I TC' Traffic Count Consultants, Inc. Dayton St 772 Turning Movement Diagram 625 20 1 227 1 19 16 201 140 13623 184th Ave NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-887 3759 172 1 328 1 8 Dayton St 15 223 79 F-54-5 Q F5O 8] Check In: 1448 95�f Out: 1448 Intersection: Dayton St @ SR 104/Edmonds Way Location: Edmonds Date of Count: Wed 4.15.03 Peak Period: 4:45 P - 5:45 P Checked By: FH Prepared For: Robert Bernstein %HV PHF EB 5.0% 0.88 WB 4.4% 0.92 NB 1.2% 0.88 SB 3.0% 0.67 Intersection, 3.2% 0.91-1 1<03018-011 I TC' Traffic Count Consultants, Inc. 13623 184th Ave NE, Woodinville, WA 98072 Phone: (425) 861-8866 FAX: (425) 861-8877 Intersection: Location: Vehicle Volume Summary Dayton St @ SR 104/Edmonds Way Edmonds Date of Count: Checked By: Wed 4.15.03 FH T Time Ime Interval g at From North on (SB) Sunset Ave From South on (NB) Sunset Ave From East on (WB) Dayton St From West on (EB) Dayton St Interval Total ___F_ T L S R T L S R T L S R T L S R ;,Ending - 1 5 -4:15,1?�� 8 7 100., 4 1 28 126, 3' 3' 14 37 2 4'. 4 38 22' :385:' 4:30 P - 30 P 1 0 16 4 0 29 100 2 6 17 32 1 7 1 34 32 268 4:45,P, P 1 1 2 0. 24 105 7 3 21 43 2 4 3 28 24,]: 265� 5:00 P 2 9 88 1 3 1 43 73 1 2 22 58 3 3 2 1 57 37 396 5 �3 40 2 41 102 1 '5 27 56 3 5 4 59 38 376' 5:30 P 0 1 30 8 0 45 89 2 2 17 58 5 6 6 41 39 341 �5:45 P 1 6 69 7 43' 64 4 5 13 51 4 4: 4 44 26,' 8,36... 6:00 P 1 5 5 8 3 38 55 2 2 16 45 4 2 5 49 31 263 61:15 �P 0 0 0 0 0 0 0 0 0 0 0 0 9 0, 0 0 0 Q 6:30 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '6:45 P 0_ O_ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00 P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Survey 19 32 353 38 10 291 1 714 1 22 1 28 1 147 35 29 350 249 1 2629 :' � , 4:45 0 ''t:45 P k H" gum"''ry, -ea our. ma Total 8 19 227 20 6 172 328 1 8 14 7 223 15 18 16 201 140 1448 Approach 266 508 317 357 1448 %HV 3% 1% 4% 5% 3% PHF 0.67 0.88 0.92 0.88 0.91 Legend: Prepared For: T= Number of heavy vehicles (greater than 4 wheels) L= Left -Turn S= Straight R= Right -Turn HV= Heavy Vehicles PHF= Peak hour Factor (Peak hour volume / (4*Highest 15 minutes)) Robert Bernstein K03uO1 8-011 pf I I Commwft (mom is betw)l arry significant traffic event? ON YOUR MAP: I. CaNm" (OAPOC"y H-th) 2 Lme dhr� 3. Whom ym so 4. Stop sIgn or signal 5. LABELSTREETS 6. Landrnaft on corners A15 F,� V-8, ow� �22� ' C f W IV 7a-,L .,�F,Pioa4195 ......... ------------- r 4/0 GARY HAAKENSON CITY OF EDMONDS MAYOR 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: wwwci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering March 29, 2006 Art Haug, AIA LMN Architects 801 Second Avenue, Suite 501 Seattle, Washington 98104 RE: Edmonds Center for the Arts Technically Infeasible request for Orchestra Pit Expansion Dear Mr. Haug; After review of your request to be exempt from accessibility requirements for the expanded Orchestra Pit area at the Edmonds Center for the Arts, based on International Building Code Section 3409 the request is granted. It should be noted that other code required aspects of accessibility for example, parking, building entrances, toilet facilities, assembly seating, assisted listening devices, access between floors, signage, etc. is fully compliant with this project. Sincerely, ��r Jeannine L. Graf Building Official, CBO k Incorporated August 11, 1890 Sister CitV - Hekinan, Japan LMNARCHITECTS 27 March 2006 Judsen R. MarqUardl. FAIA John F. Nesholm. FAIA Marie Harrison Roberi W. Widmeyer, AIA Senior Permit Coordinator Mark Reddingron, AIA City of Edmonds Wait IN. NiehoH. Jr.. AIA 121 5" Avenue North Cjjrist�ph�-. J Eseman, AIA Edmonds, WA 98020 Geo,o� H L.w-h1kv, FAIA Re: Edmonds Centerfor the Arts Project —Permit #2005 0778 Orchestra Pit Expansion Dear Ms. Harrison: This letter is to request a permit amendment to enlarge the existing orchestra pit and to request a determination of technical infeasibility regarding the provision of wheel chair access to the Pit. The existing pit is of a size to seat approximately 20 musicians and is not accessible by wheelchair. The Owner has determined that the existing orchestra pit should be enlarged to seat up to 25 musicians in order to better present a wider range of events. Given the physical constraints of the existing structure it is not possible to include a wheelchair ramp or lift without using up the intended added space in the pit. The attached revised plans A201 and A502 show the proposed configuration which is achieved by deleting 12 fixed seats from the center seating section and moving the west pit edge to the west approximately 3 feet, The access points to the pit area are now proposed as gates as shown in the plan. There are no changes to the exiting scheme as a result of this plan revision. Whereas IBC 3409.7.6 would require the altered pit to be accessible the limited space available to accomplish this makes it technically infeasible. The area gained would be more than taken up by insertion of a ramp or a lift. The mechanisms inherent in the lift assembly are such that they would protrude above stage level. Since the building is on the State Historical register, IBC 34-09.8 would allow continued use without wheelchair access. Sincerehi Art Haug, AIA Associate LMN Architects Enclosures; Partial plans A201 &A502 801 SECOND AVENUE, SUITE 501 SEATTLE, WASHINGTON 98104 206.682.3460 FAX 343.9388 LMNARCHITECTS 7 TRANSMITTAL TO FROM Scott Griffin ArtHaug FIRM/ ORGANIZATION DATE 4k Sellen 2 November, 2005 ADDRESS PROJECT NAME 227 Westlake Avenue North Edmonds Center for the Arts PO Box 9970 PROJECT NUMBER Seattle WA 98109 02186 COPYTO E]WITHOUT ENCLOSURES TRANSMITTED HEREWITH: NUMBER DATED ITEM 3 11/30/05 rev Submittal 32 02300 Precast Vault Drawings and Calcs - Revised NJ Z APPROVED, AS NOTED REMARKS: We note that this is a re -submittal of earlier submittal 0011 02300. V 44A'4(%*V. Aw� Reed* APPROVED BY ENGINEERING DEC 8 Date: BUILDING DEPT. STREET FILE 801 SECOND AVENUE, SUITE 501 SEATrLE, WASHINGTON 98104 206.682.3460 FAX 343.9388 SUBMITTAL TRANSMITTAL Sellen Project # 5347 - Edmonds Center for the Arts - CONSTRU(MOC Kim/ Q q )nna � Seji7e7n TO: LMN Architects I! SUBMITTAL # ATTN: HAV N Art Haug L 0032 ADDRESS: 801 Second Avenue, Suite 501 Seattle, WA 98104 FROM: Scott Griffin DATE SUBMITTED: 1 1/30/2005 RESPONSE DEADLINE: 1 12/14/2005 THE FOLLOWING SUBMITTAL IS TRANSMITTED FOR YOUR REVIEW PLEASE REVIEWAND RETURN BYABOVE DUE DATE. SUBMITTING FIRM: Interwest Construction, Inc. SUBMITTAL ITEM: Precast Vault and Design Calcs - Revised SPEC SECTION: 02300 1 SUB SECTION: 004 ff items are not received as listed, Dlease contact us immediatelv. 5 1 Shop Drawings with Design Calcs Please see the attached precast vault shop drawings with design calcs. I APPROVED I I APPROVED AS NOTED I I REVISE & RESUBMIT I I REJECTED I I SIGNED: I I RETURNED TO SUB: RETURNED-VIA:­ 0 E C - 8 �&' BUILDING DEPT. 227 Westlake Ave. N. Tel (206) 682-7770 GENERAL CONTRACTING PO Box 9970 Fax (206) 623-5206 CONSTRUCTION MANAGEMENT SELLEN CONSTRUCTION I Seattle, WA 98109 www.selien.com I CUSTOMER SERVICE GROUP F I- 92,21 Structural Design Calculations Ld 0 g! I . 09 6 For z ew 9 J_ in I cc I 18'W XXL X 8.5'H Detention Vault, cc .y 0 0 0 U. Sal UJ 0 > cc LL W 0 z cc -.0 Project: Edmonds Center for The Arts 8 go 0 Prepared for z 1! 1 1 0 W z t I Granite Precasting & Concrete Inc. 4C W 1 4116 Bakerview Spur, Bellingham, WA 98226 Prepared by Yuan -An Su, P.E., S.E. 16555 NE 11 8h Way Redmond, WA 98052 Design Code: Standard Specifications for Highway Bridge design, 17'h Edition, 2002, AASHTO Summary of design information: 1. Active Equivalent fluid density: Assume water table is at the ground surface. Use ASTM C857, and a coefficient of active pressure of 0.4. Per their equation, use ((125-62.4)*0.4)+62.4 = 87.4pcf 1 2. The weight density of backfill and cover soils: 125pcf. I 3. Design ground water table is at the ground level. 4. Design Load: AASHTO HS-20 5. Design Fill Cover: V-O" Min, to 3'-0" Max. Cover 6. Concrete Strength : fc' = 5000psi at 28 days-, Grout — fc'=6000psi at 56 days, Non -Shrink Grout 7. Reinforcing steel: ASTM-A615 Grade 60, fy = 60000psi 8. Min. Allowable Soil Pressure 2000 DEC - 8 BUILDING DEPT. FXPIMES a it Nd w r- -r A A . -T a � Granite Precasting Fax;360-671-0780 Nov 28 2005 10;35am P002/005 b-%Aftq= cow Fax Cover letter From: Luke Su 16555 NE I I 81h way RednWnd, WA 99052 Tel: (425)961-6592 FeW (425)861-6582 Date-'NOVember 24,2005 TOW (include cover pap): 4 pages To: w chris A.Uen Granitc Precasfn & Concrete 4,116 Bakerview spur Bellinghka4 wA. gg226 PH;(360) 671-2251 FX(360) 671-0780 Project IS'Wx33'Lxg.S'H Detention Vault, Fdmonds Center for the Arts Remark: A 48 in. Manhole Sump opening in the S, * Foundation Slab Unit Chris� The opening fbr the proposed 48 in diameter manhole Sump in the S, precast foundadon slab unit is 4=Ptablc- Please see the attached structinji calculations fbr the slab opening. All the, interrWed reWorcing bars encountered ihe opening shall be cut and the same amount of all the interrupted reinforcing bars shall be added back DD the both sides of the opening Within the bWf width *Of the Opening On each side between the wdsting bars, For the longitudinal bar at top, #s @4" O.C. Shall be used on each side of 'the openin& Smular sftngthcnmg WIth additional Steel bars shall be made for the opening. Please refer to the Notes in Sheet No. 12 for details an opening. Regaw% Luke (Yuan -An) Su, p.L, S.E. ;4/�s Received Time Nov.28. 10:36AM Client: lGranite Precast Side Wall Design Assume that the side walls were hinged and supported at the bottom during backfill Lateral Water Live Earth Pressure pressure Load Surcharge t t' p, Hs y.h. Lateral Loads: Lateral Earth Pressure I p. HL Finish Grade Eleve. = 58 ft Top of FND Slab Elev. = 45.5 ft (BOT. IE) Hs = 12.500 ft Equivalent fluid pressure, Pa = 0.025 kcf Pa Hs 0.313 ksf Per (125-62.4)*0.4 = 0.025, Granite Email, dated Octorber 10,05) Ground Water Pressure h = 12.500 ft 7W = 0.0624 kcf ywhw = 0.780 ksf .0 Live Load Surcharge HL = 2 ft pa HL = 0.100 ksf Wall Section Top Slab, t = 0.833 ft 10 in. Height, h = 8.542 ft, total height = 9.375 ft Haunch, rn = 1.417 ft Cover 3.125 ft Wall Thickness, tj = 8.31 in t2 = 10 in Fnrrp,� in thp -idp wqll.-, (STAAD file- VAULT3S-ANL) Lateral Looads jEarth Pressure, EH I Water Pressure, WA LL Surcharge Location V(k-ft) M(k-fUft) V(k-ft) M(k-fUft) V(k-ft) M(k-ft/ft) Top of haunch -0.800 -0.660 -2.010 -1.64 -0.490 -0.33 Bottom of haunch -0.600 0.640 -1.500 1.60 -0.300 0.39 Wall, 0.6(h-m) -0.120 1.710 -0.290 4.27 0.020 0.840 Wall 0.5(h-m) 0.040 1.740 0.090 4.34 0.050 0.830 Wall 0.4(h-m) 0.200 1.650 0.510 4.13 0.130 0.760 Reaction at key way 0.990 0.000 2.480 0.00 0.410 0.000 , /// � Pe7f 3-Sided-Vault.xls\SideWall 1 Lateral Looads Dead Load LL Truck Location V(k-ft) M(k-fttft) V(k-ft) M(k-ft/ft) Top of haunch -1.450 -13.020 -6.700 -60.05 Bottom of haunch -1.450 -10.350 -6.700 -47.76 Wall, 0.6(h-m) -1.450 -6.210 -6.700 -27.38 Wall 0.5(h-m) -1.450 -5.180 -6.700 -23.88 Wall 0.4(h-m) -1.450 -4.140 -6.700 -18.26 Reaction at key wayl -1.450 0.000 -6.700 0.00 Wheel load distributed Width, E(ft)= 5.000 5.00 Design Specification: AASHTO Bridge Design Standard Specification, 17th Edition, 2002 Load Combinations Case 1, DI-+E11+WA+S�!�. Case 2, DL+EH+WA+LL Truck Load Factors: y = 1.30 y = 1.30 OD = 1 -00 OD = 1 -00 OL = 1.67 For live load surcharge OL = 1.67 For +M PE = 1.30 For earth pressure PE = 1.30 0.5 OE, = 1 .00 For water pressure PEw = 1-00 0.5 Load Combinations CASE 1 CASE 2 1 Location Vu(k-ft) Mu(k-ft/ft) Vu(k-ft) -Mu(k-ft/ft) +Mu(k-ft/ft) Top of haunch -6.91 -20.89 -8.76 -46.25 Bottom of haunch -5.50 -9.45 -7.76 -31.03 Wall, 0.6(h-m) -2.42 2.19 -5.37 -11.52 -16.08 Wall 0.5(h-m) -1.59 3.65 -4.61 -8.52 -8.49 Wall 0.4(h-m) -0.60 4.43 -3.79 -5.15 -7.68 Reaction at key way 3.90 0.00 0.10 0.00 -3.99 Material Properties fc. = 5000 psi 0.80 fcr 530 psi fy = 60000 psi m = fy/O. 85fc' = 14.1 Rn = Mu/(�bd 2) pm. = 0.75Pb = 0.025 p = 1/m(l -(1-2mRn/fy)"2) Check Shear Requirement Group I Locations t(in) cover(in) Bar size d(in) Vc(k/ft) Vu (k/ft) Top of wall 27.0 1.5 7 25.06 0.85 36.2 8.8 o.k. Haunch 10.0 1.5 7 8.06 0.85 i 1.6 7.8 o.k. Bot. of Wall 9.2 1.5 7 7.22 0.85 10.4 3.9 o.k. Reinforcing Steel Design for the side wall Group I Design #7, As 0.60 2 in Locations Mu(k-fUft) 1.2Mcr Mu(k-fUft) Of Rn(psi) P As(in2/ft) Sreq(in) Haunch -31.0 10.6 31.0 0.90 530.4 0.0095 0.92 7.86 Wall 4.4 8.9 5.9 0.90 125.8 0.0021 0.18 39.04 For All Bar, Use #7 @ 6 in, As= 1.20 o.k. For BI Bar, Use #6 @ 12 in, As= 0.44 o.k. For Shinkage and Temperature, Nin = 0.0018 0.198 For C1 Bar, Use #4 @ 12 in, As= 0.20 o.k. 3-Sided-Vault.xlskSideWall 2 Structural Desi-qn of End Walls Horizontal Span = 18.693 ft Height 8.958 ft Distribution Factor = 0.95 to the short span of the end wall Section/h Elev.(ft) Active Earth Pressure Water Pressure LL Surcharge pah(kso VE(k/ft) ME(k-fUft) yh(ks� V.(k/ft) Mw(k-fttft) VLL(k/ft) MLL(k-ft/ft) 1.0 8.542 0.099 0.728 0.000 0.247 1.814 0.000 0.427 0.000 0.9 7.688 0.121 0.634 0.583 0.300 1.560 1.�53 0.342 0.328 0.8 6.833 0.142 0.522 1.078 0.354 1.301 2.686 0.256 0.584 0.7 5.979 0.163 0.392 1.469 0.407 0.976 3.662 0.171 0.766 0.6 5.125 0.185 0.243 1.742 0.460 0.606 4.340 0.085 0.876 0.5 4.271 0.206 0.076 1.879 0.514 0.190 4.683 0.000 0.912 0.4 3.417 0.227 -0.109 1.867 0.567 -0.272 4.651 -0.085 0.876 0.3 2.563 0.249 -0.312 1.688 0.620 -0.779 4.206 -0.171 0.766 0.2 1.708 0.270 -0.534 1.328 0.673 -1.331 3.308 -0.256 0.584 0.1 0.854 0.292 -0.774 0.770 0.727 -1.929 1.919 -0.342 0.328 0 0.000 0.313 -1.032 0.000 0.780 -2.572 0.000 -0.427 0.000 Total Fx 1.760 1 otal Fx = 4.38b yc(ft) 3.532 yc(ft) = 3.532 Rx, top(kif) 0.728 Rx, top(klf) = 1.814 Rx, bot(klf) 1.032 Rx, bot(klf) = 2.572 Load Combinations for the end walls Section/h Group I Vu(k/ft) Mu(k-fUft) 1.0 4.51 0.00 0.9 3.87 3.59 0.8 3.13 6.58 0.7 2.30 8.91 0.6 1.38 10.49 0.5 0.38 11.24 0.4 -0.72 11.10 0.3 -1.91 9.98 0.2 -3.19 7.81 0.1 -4.56 4.51 1 0 1 -6.02 1 0.00 Check Shear Requirement t = 8.00 in Cover = 1.5 in Bar size # 6 d = 6.125 in �,Vc = 8.84 k/ft Vu, max = 6.02 k/ft o.k. Reinforcement Design for the positive moment in the end walls Group I Design #6, As Mu(k-ft/ft) 1.2Mcr Mu(k-ftift) Rn(psi) P 11.24 6.8 11.2 0.90 333.0 0.005787 For longitudinal reimforcing steel, Use #6 @ 10 in, As = For Shinkage and Temperature, Pmin = 0.0018 For Transverse steel, Use #5 @ 12 in, As = 0.44 in 2 As(in2lft) Sreq(in) 0.43 12.41 0.528 o.k. 0.13 0.31 o.k. 3-Sided-Vault.xls\SideWall 3 Granite Precasting Fax;360-671-0780 Nov 28 2005 10;35am P003/005 r--T L.L;-r.L-a L-UP%W IOU 'Tr-Q-00A -00or- V . Q -C!Rck Slab-oRaning fbtgump Opening Size = 4 ft diameter. Sump Center of the Opening, x = 16.17 ft ftm the left end of the f0undgWon Slab CMcw Section atx = 18-167 ftfrom the left end Of ft kundetlon Slab ThS Width Of the slab unii a 8.0 ft DetennIn the seed.on fore" In the foundation sl2b for case I RY-Left = 12.769 k"M Water p., 0408 kof Clitoal Sectionsteft End Left W211 - I-OPenina 000rdin2ft jdrft—l= -1 AAR rd-4-mv— fP.i(kgf)= 1.272 1.342 2.217 fp,i*dX(klQ- 1.760 29.939 W(14 - � OB79 10.446 W(k" 1.76.0 -11-008 10-425 Mu(k-fQht 1.174 -24.35a Debyrnin 00 8841011 1*rcM In the f61110dation allab for came 2 eftwau CdtowftationsIl-aft '%Y-Lj= = End I 1 -3295 k/It by the i Loft Wall coordinate )d(ft) = 0 1 - W7 _ppanft --f S. 1-57 fP,I(RSQc 0.597 0.767 1.1542 f0,l*dx(ldn= 0'M 20256 Xcil(ft) = 0.564 10,775 Vu(kd* 0.905 -10.3" 9.912 Mu(k-1t)/ft 0.663 -23.609 Check Shwr at Me apenino VU 0 20.9 M 0'vc M 20A k/ft SSY O-lL wb the adelkional dlagnal reln1breiing steels Re MU = -48.7 k-" lnfcmfng 6" Dgwlgn f0r the IOUndlatlon sMb with opening Group I Dealp 08, As 0.79 Ir? Locations Mu(k-") 1.2Mcr Mu(k4ft) 6f Rn(Ps!) AsOn'/M Sreq(in) TOP 48.7 272 48.7 0.90 376.9 O-COSS 0.95 10.02 Equivalent 3 4 in a.k. 3L.$idecLVaultxlS%FNDSLAB 4 Received Time Nov.28. 10:36AM Check Bearing at the bottom of the end wall Bearing depth = Bearing Capacity = Vu = 3 in 107.1 k/ft(00.85fdAg) 0 = 0.70 6.016 k/ft at bottom o.k. per AASHTO 8.16.7 3—Sided—Vault.xls\SideWall Client: IGranite Precast Project: I Edmonds Center for the Art Date: -ov. 17, 05 Subject: 13-Sided Detention Vault, Side Walls with 3 ft Soil Cover Design: I Luke Su Top Slab design Clear Span, Lc = 18 ft Width of a precast unit, B = 6.5 ft Hunch Size = 1.417 ft Thickness of supporting walls = 10 in Slab Depth, t = 10 inch Design Live Load HS20 Wheel Load, P 16 kips 6 ft for the truck travelling perpendicular to the longit. axis of the precast unit (Not Controlled)k 14 ft he truck travelling parallel with the longit. axis of the precast unit Live load Analysis to one line of wheels LL, Truck: Maximun negative moment with hinged supports, STAAD file: VAULT3S.ANL Imnact Fraction. I = 0.30 Sections I LL, ruck F­M(k-ft) I V(k) Center of the side wall at left -60.5 26.9 Face of Left Hunch -33.83 23.5 Mid span 47.7 10.2 Face of right hunch -33.82 23.8 Center of the side wall at right, -60.5 25.5 Permanent Loads DL = 0. 504 k/ft (0. 125*3+0.155*10/12) FH- F:;rth nrpqqure at side walls. STAAD file: VAULT3S.ANL Sections I DL Earth Pressure, EH Water Pressure, WA I M(k-ft/ft) I V(k/ft) I M(k-ft/ft) V(k) M(k-ft/ft) V(k) Center of the side wall at left -13.02 4.71 -0.66 0 -1.64 0 Face of Left Hunch -5.23 3.79 -0.66 0 -1.64 0 Mid span 9A5 0 -0.66 0 -1.64 0 Face of right hunch -5-23 3.79 -0.66 0 -1.64 0 Center of the side wall at right, -13.02 4.71 -0.66 0 -1.64 0 Load Combinations Load Factors: 7 = 1.30 PD = 1-00 PL = 1.67 PE = 1.30 PE = 0.50 PW = 1.00 Forliveload For earth pressure effect on the top slab, -M For earth pressure effect on the top slab, +M 3-Sided-Vault.xls\TopSlab 5 Client: Granite Precast D=ate-Nov. 17, 05 Proiect: Edmonds Center for the Art -��ubject: 3-Sided Detention Vault, Side Walls With 3 ft Soil Cover Design: I Luke bu Equivalent strip width for wheel loads Span Length, S = 16.00 ft Per AASHTO Article 3.24.1 Standard Specifications for Highway Bridge, 17th edition, Article 3.24.3 Case A: Main Reinforcement perpendicular to Traffic (Spans 2 to 24 feet Inclusive) M = 9 k-ft/ft BE = 8.89 ft for +M*B,,=P(S-6)/2 Case B: Main Reinforcement parallel to Traffic (Spans 2 to 24 feet Inclusive) E = 4.96 ft, which is equal to 4+0.06S <= 7ft AASHTO LRFD Bridge Design Specifications, Article 4.6.2 E = 5.48 ft for +M but not greater then 6 ft per wheel E = 4.00 ft for -M but not greater then 6 ft per wheel Min Fill Cover = I ft Use E= 4.96 ft for moment Use E= 6.50 ft for Shear 1'-- 1 1^nAc nexr fAnt nf tho Vni lit Sections I Gro p 1 Mu(k-ft/ft) Vu(k/ft) Face of Left Hunchl -29.3 15.1 Mid span 36.5 4.4 Face of right hunch -29.3 15.3 Material Properties fcl = 5000 psi 0.80 fcr 530 psi fy = 60000 psi 2) m = fy/0.85fc, = 14.1 Rn = Mu/(�bd 0 = 0.75m, = 0.025 p = 1 /m(l -(1 -2m!Rnffy)"�') max t = 10 in d = 7.5625 in for bar # 7 at top d = 8.0625 in for bar # 7 at bottom Reinforcing Steel Design for the top slab Group I Design Locations Mu(k-fUft) 1.2Mcr Mu(k-fUft) �f Rn(psi) Haunch -29.3 10.6 29.3 0.90 569.2 Bot of Lid 36.5 10.6 36.5 0.90 623.5 V, As = #6, As = For Bar All 00, Use #7 @ 6 in, For Bar A300, Use #7 @ 6 in, For Shinkage and Temperature, P,in = Ratio of distribution steel in the transverse direction = P 0.010 0.011 As = As = 0.0018 0.55 For Bar C1 00, Use #5 @ 6 in, As= 0.60 in 2 0.44 in 2 As(in�'/ft) Sreq(in) 0.93 7.76 1.02 7.03 1.20 o.k. 1.20 o.k. 0.22 0.51 at top 0.56 at bottom 0.620 o.k. Check Shear Requirement 1/2 1/2 1/2 Per AASHTO 8.16.6.7, Vc = (2.14fc' +4600p (Vud/Mu)bd > 3fc' and < 4fc' p = 0.0132 Vu 15.1 kips/ft Mu -29.3 k-ft/ft p Vud/Mu = 0. 0 132 �,Vc(k/ft) = 16.4 kips o.k. Per AASHTO 8.16-6.7 Note:AASHTO Standard Specification, Article 3.24.4, Shear is consider to be satisfactory. 3 Sided-Vault.xIs\TopSlab 6 Client: IGranite Precast Project: I Edmonds Center for the Art Date: Nov. 7, 05 Subject: 13-Sided Detention Vault, Side Walls with 3 ft Soil Cover Design: I Luke �u Design of the Foundation Slab Length, B= 21.667 ft Depth, h = 1.333 ft Design ground water level at = 12.5 ft above the top of foundation slab per Granite's design criteria Note: Per Geotechnical Report, the underground water table is 0 ft above the bottom of footing Effective Dead Load Side Wall-R I ti(ft) t2(ft) Length(ft) I VOI-W/ft) -( (k/fl?) I DLi(k/ft) 0.693 0.833 9.375 7.153 0.155 1.109 Side Wall-L 0.693 0.833 9.375 7.153 0.155 1.109 Top Slab 0.833 0.833 18.000 15.000 0.155 2.325 Haunch 1.417 0.000 2.833 2.007 0.155 0.311 Total 31.314 4.864 Foundation Slab 1.333 1.333 21.667 28.889 0.155 4.478 Fill Cover, Ev 3.125 3.125 19.667 61.458 0.125 7.682 Backfill abov FND, Ev 12.500 12.500 2.000 25.000 0.125 3.125 Live Load HS30 Axle Load = 32 kips over 10 ft, P/E 3.2 ktft Maximun Eccentricity, e = 6.35 ft from C.L of FND Slab Moment 20.31 kip-ft/ft Detended Water 8.542 8.542. 18 153.750 0.0624 9.594 ktft Check Bearing Capacity Per Allowable Stress Design Method Total water head, H, 13.83 ft above the bottom of foundation slab, y, Hw(ksf) 0.863 Case 1, DL+LL, Truck+ Detended Water ZP = 32.933 kipstft EM = 20.31 kips-ft/ft ec = 0.617 ft B/6 3.611 ft Be = 21.67 ft (=3*(B/2-e,) if ec>B/6) Total qm,. = 1.780 ksf Effective q,,. = 0.916 ksf qa = 2 ksf o.k. Case 2, DL+LL, Truck IP = 23.339 kips/ft EM = 20.31 kips-fUft e. = 0.870 ft B/6 = 3.611 ft Be = 21.67 ft (=3*(B/2-ec) if e,>6/6) Total qmax = 1.337 ksf Effective qma, = 0.474 ksf qa 2 ksf o.k. Structural Design of the foundation slab Load Combinations Load Factors: Y= 1.30 13D = 1.00 PL= 1.67 Forliveload PEv = 1.00 For vertical earth pressure (backfill cover) PE, = 1.00 For water 3-Sided-Vault.xls\FNDSLAB 7 Client: lGranite Precast Project: I Edmonds Center for the Art . Date:lNov. 17, 05 Subject: 13-Sided Detention Vault, Side Walls with 3 ft Soil Cover Design: I Luke Su Case 1: Water full in the vault Clearence between the side walls = 18.281 ft Length between the center of the side walls = 18.974 ft Water pressure at the top of the FND slab= 0.506 ksf, the equivalent water head = 8.103 Pu = 39.78 k/ft MU = 44.09 k-fttft ec = 1.108 ft B/6 3.611 ft Be = 21.67 ft (=3*(B/2-e,) if ec>B/6) f,w = 2.399 ksf at x = 21.667 ft fmin = 1.272 ksf at x = 0.000 ft Wall Locations: Xc = 11. 942 ft from fj, X-left-- 1.346 X-right = 20.320 Ry-Left = 12.769 k/ft by the left wall Ry-right 17.416 ktft at the R Wall Determin the section forces in the foundation slab for case I Depth of the foundation slab 1.333 ft d= 1. 167 ft for #8 bar with 1.5" coverage Critcal Sections I Left End -M-left I V-left I+MatCLI V-right I -M-right IRight end coordinate xi(ft) = 0 1.346 2.859 11.375 18.807 20.320 21.667 fp,i(lksf)= 1.272 1.342 1.421 1.864 2.251 2.329 2.399 fp,i*dx(klf)= 1.760 2.091 13.989 15.291 3.465 3.183 xc,i(ft) 0.679 2.110 7.309 15.208 19.568 20.997 Vu(ktft) 1.760 -11.008 -9.683 0.000 11.533 14.233 -3.183 Mu(k-ft)/ft 1.174 -14.494 -58.399 -17.323 2.154 Case 2: the vault is empty Pu = Mu = ec = Be = fmax = fmin = Xc = Ry-Left = 27.31 k/ft 44.09 k-ft/ft 1.615 ft B/6 3.611 ft 21.67 ft (=3*(B/2-ec) if ec>B/6) 1.824 ksf at x = 21.667 ft 0.697 ksf at x = 0.000 ft 12.448 ft from fmi, X-left-- 1.346 11.330 k/ft by the left wall Ry-right Wall Locations: X-right = 20.320 15.977 k/ft at the R Wall Determin the section forces in the foundation slab for case 2 DeDth of the foundation slab = 1.333 ft d= 1. 167 ft for #8 bar with 1.5" coveracie Critcal Sections I Left End I -M-left I V-left +M at CL I V-right I -M-right I Right End coordinate xi(ft) = 0 1.346 2.859 11.405 18.807 20.320 21.667 fp,i(lksf)= 0.697 0.767 0.846 1.290 1.675 1.754 1.824 fp,i*dx(kif)= 0.985 1.220 9.124 10.975 2.594 2.408 xc,i(ft) 0.684 2.115 7.428 15.266 19.570 20.998 Vu(k/ft) 0.985 -10.344 -9.124 0.000 10.975 13.569 -2.408 Mu(k-ft)/ft 0.653 -14.091 -55.782 -16.920 1.632 Structural Design of the foundation slab Material Properties fc. = 5000 psi fy = 60000 psi rn = fy/O. 85fc' = 14.1 pm.x = 0.75Pb = 0.025 fulzmlf] Rn = Mu/(�bd 2) p = 1 /m(l -(1 -2mRn/fy) fcr = 530 psi 3-Sided-Vault.xls\FNDSLAB 8 Client: I Granite Precast Project: Edmonds Center for the Art Date: I Nov. 17, 05 Subject: 13-Sided Detention Vault, Side Walls with 3 ft Soil Cover Design:lLuke Su Check Shear Requirement Group I t(in) cover(in) Bar size d(in) 0,, 0,, Vc(k/ft) Vu (k/ft) Top Bar 16.0 3.5 8 12 0.85 17.3 11.5 o.k. Bot. Bar 16.0 1.5 6 14.125 0.85 20.4 11.0 o.k. Reinforcing Steel Design for the foundation slab #6, As = Group I Design #8, As = Locations Mu(k-ft/ft) 1.2Mcr Mu(k-fttft) Of Rn(psi) P Top 58.4 27.2 58.4 0.90 450.6 0.0080 Bottom 2.2 27.2 27.2 0.90 151.2 0.0026 Top Bar for Foundation slab, Use #8 @ 8 in, As= Bottom Bar, Use #6 @ 12 in, As= Per AASHTO Article 8.20 for Shinkage and Temperature, Asmi, = For Transverse steel, Use #4 @ 12 in, As= Check Uplift Buoyancy Force Weight of the detention vault: Unit weight length(ft) DL(kips) 3-sided walls 4.854 33.09 160.6 End Walls 19.475 2 39.0 Foundation Slab 4.478 36.43 163.1 Subtotal 362.7 Soil Cover h = 3.125 ft Area: L= 36.427 ft B 21.667 ft Unit Weight = 0.125 kcf Subtotal of soil cover = 308.3 kips Soil Backfill above footing 0.44 in 2 0.79 in 2 As(in'Jft) Sreq(in) 1.15 8.27 0.44 12.14 1.185 o.k. 0.44 o.k. 0.13 in' 0.200 o.k. h 9.375 ft Area Foundation Slab 789.3 ft' Detention Tank= 667.4 ft2 Backfill Area = 121.9 ft2 Subtotal of backfill for wall = 142.8 kips Total effective WDL = 813.8 kips YDL 0.90 Friction Resistance between soil and the side walls Effective horizontal active force = 1.956 k/ft Total length of side walls = 108.2 ft Total Active force = 211.6 kips Friction coeffeicient = 0.267 ( =0.40/1.5, per the Geotechnical Report) Effective Friction Resistance = 56.4 kip Uplift water head h, = 13.833 ft uplift pressure = 0.863 ksf Foundation Slab, A = 789.25 ft2 Total Buoyancy = 681.3 kips Factor of Safety against Buoyancy,FS 1.16 o.k. 3-Sided-Vault.xls\FNDSLAB 9 Client: Granite Precast I Project: Edmonds Center for the Art DaUN-ov17, 05 Subiect: 3-Sided Detention Vault, Side Walls with 1 ft Soil Cover Design: I Luke Su Check Shear Requirement t(in) cover(in) Bar size d(in) 0,, Vc(k/ft) Top Bar 16.0 3.5 8 12 0.85 17.3 Bot. Bar 16.0 1.5 6 14.125 0.85 20.4 Reinforcing Steel Design for the foundation slab #6, As = Group I Design #8, As = Locations Mu(k-fttft) 1.2Mcr Mu(k-fttft) Of Rn(psi) P Top 40.7 27.2 40.7 0.90 313.9 0.0054 Bottom 1.8 27.2 27.2 0.90 151.2 0.0026 Top Bar for Foundation slab, Use #8 @ 8 in, As= Bottom Bar, Use #6 @ 12 in, As= Per AASHTO Article 8.20 for Shinkage and Temperature, Asmin = For Transverse steel, Use #4 @ 12 in, As= Check Uplift Buoyancy Force Weight of the detention vault: Unit weight length(ft) DL(kips) 3-sided walls 4.854 33.09 160.6 End Walls 19.475 2 39.0 Foundation Slab 4.478 36.43 163.1 Subtotal 362.7 Group I Vu (k/ft) 8.3 o.k. 7.8 o.k. 0.44 in' 0.79 in 2 As(in'tft) Sreq(in) 0.78 12.10 0.44 12.14 1.185 o.k. 0.44 o.k. 0.13 in' 0.200 o.k. Soil Cover h = 1.125 ft Area: L = 36.427 ft B 21.667 ft Unit Weight = 0. 125 kcf Subtotal of soil cover = 111.0 kips Soil Backfill above footing h 9.375 ft Area Foundation Slab 789.3 ft' Detention Tank= 667.4 ft2 Backfill Area = 121.9 ft' Subtotal of backfill for wall = 142.8 kips Total effective WDL = 616.5 kips YDL 0.90 Friction Resistance between soil and the side walls Effective horizontal active force = 1.380 ktft Total length of side walls = 108.2 ft Total Active force = 149.3 kips Friction coeffeicient = 0.267 ( =0.40/1.5, per the Geotechnical Report) Effective Friction Resistance = 39.8 kip Uplift water head hw = 11.833 ft uplift pressure = 0.7384 ksf Foundation Slab, A = 789.25 ft2 Total Buoyancy = 582.8 kips Factor of Safety against Buoyancy,FS 1.02 o.k. 3-Sided-Vau[tA.xls\FNDSLAB 10 PAGE NO. I STAAD.Pro Version 2003 Bld 1002.us Proprietary Program of Research Engineers, Intl. Date= OCT 13, 2005 Time= 22:21:33 USER ID: PacificBridge, Inc. -1 - STAAD PLANE THREE SIDED DETENSION VAULT 2. START JOB INFORMATION 3. ENGINEER DATE 06-OCT-05 4. END JOB INFORMATION 5. * 6. STRUCTURAL ANALYSIS OF 3-SIDED DETENTION VAULT, 7. PROJECT: EDMONDS CENTER FOR THE ARTS 8. 9. UNIT FEET KIP 10- JOINT COORDINATES 11. 1 0 0 0; 2 0 7.125 0; 3 0 8.958 0; 4 1.833 8.958* 0; 5 9.417 8.958 0 12. 6 17.000 8.958 0; 7 18-833 8.958 0; 8 18.833 7.125 0; 9 18.833 0 0 13. MEMBER INCIDENCES 14. 1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6; 6 6 7; 7 8 7; 8 9 8 15. CONSTANTS 16. E CONCRETE ALL 17. POISSON CONCRETE ALL 18. UNIT INCHES KIP 19. MEMBER PROPERTY AMERICAN 20. 1 8 PRIS AX 108 IZ 729 21. 2 3 6 7 PRIS AX 214 IZ 5832 22. 4 5 PRIS AX 120 IZ 1000 23. CONSTANTS 24. E CONCRETE ALL 25. POISSON CONCRETE ALL 26. SUPPORTS '27. 1 PINNED 28. 9 PINNED 29. UNIT FEET KIP 30. DEFINE MOVING LOAD 31. TYPE I LOAD 16 16 32. DIST 6 33. UNIT FEET KIPS 34. LOADING I DL 35. MEMBER LOAD 36. 3 TO 6 UNI GY -0.500 37. LOADING 2 EH 38. MEMBER LOAD 39. 1 TRAP GX 0.313 0.134 40. 2 TRAP GX 0.134 0.089 41. 8 TRAP GX -0.313 -0.134 THREE SIDED DETENSION VAULT -- PAGE NO. 2 42. 7 TRAP GX -0.134 -0.089 43. LOADING 3 WATER 44. MEMBER LOAD 45. 1 TRAP GX 0.780 0.335 46. 2 TRAP GX 0.335 0.221 47. 8 TRAP GX -0.780 -0.335 48. 7 TRAP GX -0.335 -0.221 49. LOADING 4 SURCHARG 50. MEMBER LOAD 51. 1 UNI GX 0.100 52. 2 UNI GX 0.100 53. 8 UNI GX -0.100 54. 7 UNI GX -0.100 55. *LOAD 3 HS20 56. LOAD GENERATION 18 57. TYPE 1 0 8.958 0 XINC 1 58. PERFORM ANALYSIS **WARNING -A MOVING LOAD THAT WOULD HAVE BEEN APPLIED BEYOND THE X AND Z RANGES OF THE'STRUCTURE HAS BEEN IGNORED. CASE= 18 WHEEL 2 OF 2 **WARNING -A MOVING LOAD THAT WOULD HAVE BEEN APPLIED BEYOND THE X AND Z RANGES OF THE STRUCTURE HAS BEEN IGNORED. CASE= 19 WHEEL 2 OF 2 **WARNING -A MOVING LOAD THAT WOULD'HAVE BEEN APPLIED BEYOND THE X AND Z RANGES OF THE STRUCTURE HAS BEEN IGNORED. CASE= 20 WHEEL 2 OF 2 **WARNING -A MOVING LOAD THAT WOULD HAVE BEEN APPLIED BEYOND THE X AND Z RANGES OF THE STRUCTURE HAS BEEN IGNORED. CASE= 21 WHEEL 2 OF 2 **WARNING -A MOVING LOAD THAT WOULD HAVE BEEN APPLIED BEYOND THE X AND Z RANGES OF THE STRUCTURE HAS BEEN IGNORED. CASE= 22 WHEEL 2 OF 2 P R 0 B L E M S T A T I S T I C S ----------------------------------- NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS 9/ 8/ 2 ORIGINAL/FINAL BAND -WIDTH= 1/ 1/ 6 DOF TOTAL PRIMARY LOAD.CASES = 22, TOTAL DEGREES OF FREEDOM 23 SIZE OF STIFFNESS MATRIX = 1 DOUBLE KILO -WORDS REQRDIAVAIL. DISK SPACE = 12.0/ 1031.5 MB, EX31EM = 300.5 MB 59. LOAD LIST 1, 2, 3, 4 60. PRINT MEMBER FORCES MEMBER FORCES TEREE SIDED DETENSION VAULT -- PAGE NO. 3 MEMBER END FORCES STRUCTURE TYPE = PLANE ----------------- ALL UNITS ARE -- KIPS FEET bEMIBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION NOM-Y mom-z 1 1 1 4.71 -1.45 0.00 0.00 0.00 0.00 2 -4.71 1.45 0.00 0.00 0.00 -10.35 2 1 0.00 0.99 0.00 0.00 0.00 0.00 2 0.00 0.60 0.00 0.00 0.00 0.64 3 1 0.00 2.48 0.00 0.00 0.00 0.00 2 0.00 1.50 0.00 0.00 0.00 1.60 4 1 0.00 0.41 0.00 0.00 0.00 0.00 2 0.00 0.30 0.00 0.00 0.00 0.39 2 1 2 4.71 -1.45 0.00 0.00 0.00 10.35 3 -4.71 1.45 0.00 0.00 0.00 -13.02 2 2 0.00 -0.60 0.00 0.00 0.00 -0.64 3 0.00 0.80 0.00 0.00 0.00 -0.66 3 2 0.00 -1.50 0.00 0.00 0.00 -1.60 3 0.00 2.01 0.00 0.00 0.00 -1.64 4 2 0.00 -0.30 0.00 0.00 0.00 -0.39 3 0.00 0.49 0.00 0.00 0.00 -0.33 3 1 3 1.45 4.71 0.00 0.00 0.00 13.02 4 -1.45 -3.79 0.00 0.00 0.00 -5.23 2 3 0.80 0.00 0.00 0.00 0.00 0.66 4 -0.80 0.00 0.00 0.00 0.00 -0.66 3 3 2.01 0.00 0.00 0.00 0.00 1.64 4 -2.01 0.00 0.00 0.00 0.00 -1.64 4 3 0.49 0.00 0.00 0.00 0.00 0.33 4 -0.49 0.00 0.*00 0.00 0.00 -0.33 4 1 4 1.45 3.79 0.00 0.00 0.00 5.23 5 -1.45 0.00 0.00 0.00 0.00 9.15 2 4 0.80 0.00 0.00 0.00 0.00 0.66 5 -0.80 0.00 0.00 0.00 0.00 -0.66 3 4 2.01 0.00 0.00 0.00 0.00 1.64 5 -2,01 0.00 0.00 0.00 0-.00 -1.64 4 4 0.49 0.00 0.00 0.00 0.00 0.33 5 -0.49 0.00 0.00 0.00 0.00 -0.33 5 1 5 1.45 0.00 0.00 0.00 0.00 -9.15 6 -1.45 3.79 0.00 0.00 0.00 -5.23 2 5 0.80 0.00 0.00 0.00 0.00 0.66 6 -0.80 0.00 0.00 0.00 0.00 -0.66 3 5 2.01 0.00 0.00 0.00 0.00 1.64 6 -2.01 0.00 0.00 0.00 0.00 -1.64 4 5 0.49 0.00 0.00 0.00 0.00 0.33 6 -0.49 0.00 0.00 0.00 0.00 -0.33 THREE SIDED DETENSION VAULT -- PAGE NO. 4 MEMER END FORCES STRUCTURE TYPE = PLANE ----------------- ALL UNITS ARE -- KIPS FEET MCBER LOAD JT AXIAL SHEAR-Y SHEAR-Z TORSION mom-y mom-z 6 1 6 1.45 -3.79 0.00 0.00 0.00 5.23 7 -1.45 4.71 0.00 0.00 0.00 -13.02 2 6 0.80 0.00 0.00 0.00 0.00 0.66 7 -0.80 0.00 0.00 0.00 0.00 -0.66 3 6 2.01 0.00 0.00 0.00 0.00 1.64 7 -2.01 0.00 0.00 0.00 0.00 -1.64 4 6 0.49 0.00 0.00 0.00 0.00 0.33 7 -0.49 0.00 0.00 0.00 0.00 -0.33 7 1 8 4.71 1.45 0.00 0.00 0.00 -10.35 7 -4.71 -1.45 0.00 0.00 0.00 13.02 2 8 0.00 0.60 0.00 0.00 0.00 0.64 7 0.00 -0.80 0.00 0.00 0.00 0.66 3 8 0.00 1.50 0.00 0.00 0.00 1.60 7 0.00 -2.01 0.00 0.00 0.00 1.64 4 8 0.00 0.30 0.00 0.00 0.00 0.39 7 0.00 -0.49 0.00 0.00 0.00 0.33 8 1 9 4.71 1.45 0.00 0.00 0.00 0.00 8 -4.71 -1.45 0.00 0.00 0.00 10.35 2 9 0.00 -0.99 0.00 0.00 0.00 0.00 8 0.00 -0.60 0.00 0.00 0.00 -0.64 3 9 0.00 -2.48 0.00 0.00 0.00 0.00 8 0.00 -1.50 0.00 0.00 0.00 -1.60 4 9 0.00 -0.41 0.00 0.00 0.00 0.00 8 0.00 -0.30 0.00 0.00 0.00 -0.39 END OF LATEST ANALYSIS RESULT 61. SECTION 0.4 0.5 0.6 MEMBER 1, 8 62. PRINT SECTION FORCE SECTION FORCE THREE SIDED DETENSION VAULT -- PAGE NO. 5 MEMER FORCES AT INTERMEDIATE SECTIONS -------------------------------------- ALL UNITS ARE -- KIPS FEET MEMB LOAD SEC SHEAR-Y SHEAR-Z MOM-Y MOM-Z 1 1 0.40 -1.45 0.00 .0.00 4.14 0.50 -1.45 0.00 0.00 5.18 0.60 -1.45 0.00 0.00 6.21 2 0.40 0.20 0.00 0.00 -1.65 0.50 0.04 0.00 0.00 -1.74 0.60 -0.12 0.00 0.00 -1.71 3 0.40 0.51 0.00 0.00 -4.13 0.50 0.09 0.00 0.00 -4.34 0.60 -0.29 0.00 0.00 -4.27 4 0.40 0.13 0.00 0.00 -0.76 0.50 0.05 0.00 0.00 -0.83 0.60 -0.02 0.00 0.00 -0.84 a 1 0.40 1.45 0.00 0.00 -4.14 0.50 1.45 0.00 0.00 -5.18 0.60 1.45 0.00 0.00 -6.21 2 0.40 -0.20 0.00 0.00 1.65 0.50 -0.04 0.00 0.00 1.74 0.60 0.12 0.00 0.00 1.71 3 0.40 -0.51 0.00 0.00 4.13 0.50 -0.09 0.00 0.00 4.34 0.60 0.29 0.00 0.00 4.27 4 0.40 -0-13 0.00 0.00 0.76 0.50 -0.05 0.00 0.00 0.83 0.60 0.02 0.00 0.00 0.84 END OF LATEST ANALYSIS RESULT 63. PRINT SUPPORT REACTIONS SUPPORT REACTION 'fHREE SIDED DETENSION VAULT -- PAGE NO. 6 StIPPORT REACTIONS -UNIT ----------------- KIPS FEET STRUCTURE TYPE PLANE JOINT LOAD FORCE-X FORCE-Y FORCE-Z mom-x NOM-Y mom z 1 1 1.45 4.71 0.00 0.00 0.00 0.00 2 -0.99 0.00 0.00 0.00 0.00 0.00 3 -2.48 0.00 0.00 0.00 0.00 0.00 4 -0.41 0.00 0.00 0.00 0.00 0.00 9 1 -1.45 4.71 0.00 0.00 0.00 0.00 2 0.99 0.00 0.00 0.00 0.00 0.00 3 2.48 0.00 0-.00 0.00 0.00 0.00 4 0.41 0.00 0.00 0.00 0.00 0.00 END OF LATEST ANALYSIS RESULT 64. LOAD LIST 5 TO 22 65. PRINT FORCE ENVELOPE NSECTION 2 LIST 1, 3 TO 6, 8 FORCE ENVELOPE NSECTION 2 THREE SIDED DETENSION VAULT --.PAGE NO. 7 MEMBER FORCE ENVELOPE --------------------- ALL UNITS ARE KIPS FEET MEMB DISTANCE FY LD Mz LD FZ LD MY LD 0.00 MAX -1.24 22 0.00 21 0.00 22 0.00 22 MIN -6.70 11 0.00 11 0.00 22 0.00 22 3.56 MAX -1.24 22 23.88 11 0.00 22 0.00 22 MIN -6.70 11 4.42 22 0.00 22 0.00 22 7.12 MAX -1.24 22 47.76 11 0.00 22 0.0 . 0 22 MIN -6.70 11 8.84 22 0.00 22 0.00 22 - - - - - MAX/MIN - - - - - - - - - - - - - - - - - - - - - - - - - - - FORCE VALUES FOR MEMB - - - - - - - - - - - - - - 1, AMONGST - - - - - - --- - ALL SECT - - - - - - - - - - - - - - - - LOCATIONS - 7 FY/ DIST LD MZ/ DIST LD FZ DIST LD MY DIST LD FX DIST LD MAX. -1.24 0.00 22 47.76 7.12 11 0.00 0.00 5 0.00 0.00 5 26.90 c 0.00 5 MIN. -6.7 0 7.12 11 0.00 0.00 11 --------------------------------------------------------------------------- 0.00 7.12 22 0.00 7.12 22 1.56 C 7.12 22 3 0.00 MAX 26.90 5 60-05. 11 0.00 22 0.00 22 MIN 1.56 22 11.11 22 0.00 22 0.00 22 0.92 MAX 25.20 6 46.17 12 0.00 22 0.00 22 MIN 1.56 22 9'. 68 22 0.00 22 0.00 22 1.83 MAX 23.50 7 33.83 13 0.00 22 0.00 22 MIN 1.56 22 1.84 7 0.00 22 0.00 22 --------------------------------------------------------------------------- MAX/MIN FORCE VALUES FOR MEMB 3, AMONGST ALL SECT LOCATIONS FY/ DIST LD MZ/ DIST LD FZ DIST LD MY DIST LD FX DIST LD MAX. 26.90 0.00 5 60.05 0.00 11 0.00 0.00 5 0.00 0.00 5 6.70 C 0.00 11 MIN. 1.56 1.83 22 1.84 1.83 7 -------------------------------------------------------------------------- 0.00 1.83 22 0.00 1.83 22 1.24 C 1.83 22 4 0.00 MAX 23.50 7 33.83 13 0.00 22 0.00 22 MIN 1.56 22 1.84 7 0.00 22 0.00 22 3.79 MAX 16.71 11 3.11 21 0.00 22 0.00 22 MIN 1.56 22 -34.92 10 0.00 22 0.00 22 THREE SIDED DETENSION VAULT -- PAGE NO. 8 7.58 MAX 9.91 15 -3.56 22 0.00 22 0.00 22 MIN -10.19 8 -47.70 14 0.00 22 0.00 22 ---------------------------------------------------------------------------- MAX/MIN FORCE VALUES FOR MEMB 4, AMONGST ALL SECT LOCATIONS FYI DIST LD MZ/ DIST LD FZ DIST LD MY DIST LD FX DIST LD MAX. 23.50 0.00 7 33.83 0.00 13 0.00 0.00 5 0.00 0.00 5 6-70 C 0.00 11 MIN. -10.19 7.58 8 -47.70 7.58 14 --------------------------------------- 0.00 7.58 22 0.00 7 ----------------------------------- 7.58 22 1.24 C 7.58 22 5 0.00 MAX 9.91 15 -.3.56 22 0.00 22 0.00 22 MIN -10.19 8 -47.70 14 0.00 22 0.00 22 3.79 MAX 4.11 19 0.38 5 0.00 22 0.00 22 MIN -16.99 12 -35.65 12 0.00 22 0.00 22 7.58 MAX -5.10 5 33.82 9 0.00 22 0.00 22 MIN -23.79 16 -15.36 22 0.00 22 0.00 22 --------------------------------------------------------------------------- MAX/MIN FORCE VALUES FOR MEMB 5, AMONGST ALL SECT LOCATIONS FYI DIST LD MZ/ DIST LD FZ DIST LD MY DIST LD FX DIST LD MAX. 9.91 0.00 15 33.82 7.58 9 0.00 0.00 5 0.00 0.00 5 6.70 C 0.00 , 11 MIN. -23.79 7.58 16 -47.70 0.00 14 --------------------------------------------------------------------------- 0.00 7.58 22 0.00 7.58 22 1.24 C 7.58 22 6 0.00 MAX -5.10 5 33.82 9 0.00 22 0.00 22 MIN -23.79 16 -15.36 22 0.00 22 0.00 22 0.92 MAX -5.10 5 46.16 10 0.00 22 0.00 22 MIN -23.79 16 -2.12 22 0.00 22 0.00 22 1.83 MAX -5.10 5 60.05 11 0.00 22 0.00 22 MIN -25.49 17 11.11 22 0.00 22 0.00 22 --------------------------------------------------------------------------- MAX/MIN FORCE VALUES FOR MEMB 6, AMONGST ALL SECT LOCATIONS FY/ DIST LD MZ/ DIST LD FZ DIST LD MY DIST LD FX DIST LD MAX. -5.10 0.00 5 60.05 1.83 11 0.00 0.00 5 0.00 0.00 5 6.70 C 0.00 11 MIN. -25.49 1.83 17 -15.36 0.00 22 --------------------------------------------------------------------------- 0.00 1.83 22 0.00 1.83 22 1.24 C 1.83 22 ,�7HREE SIDED DETENSION VAULT -- PAGE NO. 9 8 0.00 MAX 6.70 11 0.00 20 0.00 22 0.00 22 MIN 1.24 22 0.00 10 0.00 22 0.00 22 3.56 MAX. 6.70 11 -4.42 22 0.00 22 0.00 22 MIN 1.24 22 -23.88 11 0.00 22 0.00 22 7.12 MAX 6.70 11 -8.84 22 0.00 22 0.00 22 MIN 1.24 22 -47.76 11 0.00 22 0.00 22 --------------------------------------------------------------------------- MAX/MIN FORCE VALUES FOR MEMB 8, AMONGST ALL SECT LOCATIONS FY/ DIST LD MZ/ DIST LD FZ DIST LD MY DIST LD FX DIST LD MAX. 6.70 0.00 11 0.00 0.00 9 0.00 0.00 5 0.00 0.00 5 25.49 C 0.00 17 MIN. 1.24 7.12 22 -47.76 7.12 11 0.00 --------------------------------------------------------------------------- 7.12 22 0.00 7.12 22 5.10 C 7.12 5 66. FINISH END OF FORCE ENVELOPE FROM INTERNAL STORAGE END OF THE STAAD.Pro RUN **** DATE= OCT 13,2005 TIME= 22:21:34 **** For questions on STAAD.Pro, please contact By Email - North America : support @reiusa. c om By Email - International : support@reiworld.com Tel. (USA) : 714-974-2500 ; Fax (USA) : 714-974-4771 CUSTOMER: INTERWEST PROJECT: E13MONDS CENTER FOR THE ARTS STRUCTURE: I B'W X 3 XL X B. S'H STRUCTURAL NOTES: 1. CONCRETE STENGTH - Fc' =5,000 psi @28 Days Fc' = Recommended Stripping Strength - 3,000 psi 2. REINFORCING - ASTM-A615 GRADE 60 3. DESIGN LOAD - AASHTO HS-20 4. DESIGN FILL - 1'-0" Min. to T-O" Max COVER 5. MATERIALS AND MANUFACTURING PER ASTM C789-95 6. REINFORCING COVER 1 1/2" U.N.O. 7. GROUT - 6,000 psi @56 Days, Non -Shrink Grout 8. MIN. ALLOWABLE SOIL PRESSURE - 2,000 psf GENERAL NOTES: 1. FINISH - CLASS 2 FINISH 2. INSTALLATION AND GROUTING BY OTHERS 3. MIN. 20'CABLE LENGTH AND/ OR SPREADER BAR REQUIRED FOR LIFTING OF STRUCTURE TO BE SUPPLIED BY CONTRACTOR UPON INSTALLATION. PART LIST: 3-SIDED PIECES (4) 1. PIECE 1 (10') 49,887 lbs 2. PIECE 2 (6.5') 32,602 lbs 3. PIECE 3 (6.5') 32,602 lbs 4. PIECE 4 (10') 49,887 lbs Al BASE PIECES (5) 1. END BASE 1 311227 lbs& 2. STD BASE 2 32,193 lbs 3. STD BASE 3 32,193 lbst 4. STD BASE 4 32,193 lbs 1 5. END BASE 5 WITH SUMP 32,564 lbs i, i END WALL (2) 1. END WALL (INLET SIDE) 19,654 lbs 2. END WALL (OUTLET SIDE) 19,654 lbs 48 in. MH SUMP (26" ID H) 1,120 lbs Al PRE-TREATMENT VAULT CONFORMS TO ESIGN CO 8""CONFORMS To DESIGN CONCEPT 4 REVISIONS AS SHOWN NON -CONFORMING -REVISE & RESUBMIT THIS DOCUMENT HAS BEEN REVIEWED FOR GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY AND DOES NOT RELIEVE THE CONTRACTOR. FABRICATOR OR VENDOR OF RESPONSIBILITY FOR CONFORMANCE WITH DESIGN DRAWINGS AND SPECIFICATIONS ALL OF WHICH HAVE PRIORITY OVER THIS By V_J�z , CUMENT ATE. BUSH, ROED & ICHINGS, INC. CIVIL ENGINEERS / LAND SURVEYORS S"I'REET FILE 4D SHEET LIST: 1. COVER PAGE, GENERAL NOTES STRUCTURAL NOTES (PLAN), ISO VIEW 2. LAYOUT, PLAN, ELEVATIONS AND SECTION 3. 3-SIDED ACCESS P-1 DETAIL 4. STANDARD 3-SIDED P-2 & P-3 DETAIL 5. 3-SIDED ACCESS P-4 DETAIL 6. END BASE-1 DETAIL 7. STANDARD BASE DETAIL (B-2, 3 &4) 8. BASE LAYOUT 9. END BASE W/ SUMP BLOCKOUT DETAIL (B-5) 10. END WALL INLET SIDE DETAIL 11. END WALL OUTLET SIDE DETAILS 12. REINFORCING 13. GROUTING DETAILS 14. LIFTING & INSTALLATION HEAVY PICK: 49,887 lbs* *NOTE: Approximate weights to be verified on scale prior to shipping. 1) TOP SLABS ARE 10" THICK 2) BASE SLABS ARE 16" THICK D13) STRUCTURE HAS PIPE DEC - a 2',35 PENETRATIONS BUILDING DEPT. NOTE: CONTRACTOR TO VERIFY FINAL GRADE, PIPE PENETRATIONS AND ACCESS LOCATIONS. C- -r -T a 'M "Um= 'CXV Granite Precasting Fax;360-671-0780 Nov 28 2005 10;35am P004 Irr"p-00A -04jor- r, ./.005 Hf, LUO pq r lialy 4 W-1i - ff I I 2 T to CO Cz 00 Received Time Nov.28, 10:36AM A E A S ju wj 0 6'-6" 10, RIM ELE-V: 56.3'1--L 4of 3- --hk, 11-5 1/4" 12" INLET - PIP E: 52.0' 6'-6" v#— A A JL FT A 2'-4 1/2" I / 0 10'-8 1/2" 7' -� I �- 1'-4" , V-' BLOCKOUT V-5" 0 0 INLET SIDE I I o A A LANE POLYPROPYLENE LADDERS (2) PLC. TYP. PROVIDED FOR ACCESS T.B.D. PER FINAL GRADE. 10'-3 3/4" 8'-10 1/2" 1 12" OUTLET PIPE B-5 --T T I i . 4' B-1 B-2 B-3 B-4 L 1 01 _j ELEV: 42. 7-13/8" 7-11/4" - 7--1 1/4" 7-1 1/41, —8- ELEVATION PREr-AsTING GRANITEEL CONCRETE INE. 16 BAKERVIE- SPUR. BELLINSKAm, WA. 9U.!eft .0167 1 -2251 1 -800-808-i!ii!51 FAX: 13601671-07BO A A UTr-W A -A SCALE I / 64 V-5" ---F 1/2" GAP BETWEEN 3-SIDED & BASE SLAB 191-811- 101, 101, 101, —AZ 0 8'-6 1/2" Y-10" A X END VIEW REVISED ALL: 3/16"=l' 1 SHEET: 2 ISSUE FOP ENGINEERING EUMUNDS CENTER FOR THE ARTS 01'-4" 11 T 4 2'-2" Manhole Sump 6" 1 B'Wx33'Lxg.!i'H Detention Vault INTERWEST Ai QD 19'-8" 6' 10, P-1 4- I 1' 4 6" *�L Ar�= -I- Lill 02' ACCESS J \—LIFTING INSERT STARCON 10S X 13" (4) PLACES TYP. .PLAN 101, 101, 1. 1 51, T71 9'-7" 8 5/16" ELEVATION 8 5/16" END VIEW DRAWN BY: CHA DATE: 9/27/05 PRECASTINrx CHECKED BY: CHA OATE: 9/27/05 [letention Vault GRANITE& CONCRIETE INC. 1 11/10/05 CHA REVISED SCALE: SHEET: 3 411FBAKERVIE 6--R.BFLLIWr.-J4AMWA.-98iMf- I r 3 '01671-2251 1 _BGG_Boq-Ri!!!5 I FAX: (3601571-0700 0 9/26/05 CHA_ ISSUE FOR ENGINEERING EDMONDS CENTER INTERWEST I FOR THE ARTS I I Al 6' 6" P-2 & 3 1' 1 6 8 5/16" PLAN 1:1 IPUAYTnIU V-7" LIFTING INSERT STARCON 10S X 13" (4) PLACES TYP. 8 5/16" j i 9'-7" F:Kln VTF:W OTACCESS PLAN ELEVATION INSERT STARCON 10S X 13" (4) PLACES TYP. 9'-7" END VIEW t Granite Precasting Fax;360-671-0780 Nov 28 2005 10:35am P005/005 w Vr-Ij-C2C3 4 -97kaor- V . -r WILAWWWRMIL ff MCC Received Time Nov.28, 10:36AM B f B F 3/8" BETWEEN BASE PIECES T-1 1/4" Al 7-1 1/4' & 7-1 1/4'/L Ai Bin. Manhole Sump r04' 21'-B" B-1 B-2 B-3 B-4 B-5 BASE X-5 1/8" Al V-1 1/2--� LAYOUT 36-6 5/8" SECTION B-B SCALE 1 64 DRAWN BY: CHA DATE: 9/27/05 16 PREEASTING CHECKED BY: CHA DATE: 9/27/05 [jetention Vault GRANITE& CONCRETE INC. SCALE: 3/16"=l' SHEET: 6 41 16 BAKERVIEW SPLIR. BELL N 1 11/10/05 CHA REVISED HAM, WA. 9B226 r 4��13 01671-Oi!St 1 _8004308-2251 FAX: [3601671-0780 0 9/26/05 OiA ISSUE FOR ENGINEERING E13MUNDS CENTER INTERWEST I FOR THE ARTS I I I - T-1 3/8" Ai Z.. PLAN (4) PLACES TYP. 17-11" 91/2- 9 1/2" ELEVATION 7" T-2 3/8" T-- - -4 R JL F:FJn UTF:W 91/21, [c] F 21'-8" B-213 & 4 LIFTING INSERT STARCON 10S X 13" (4) PLACES TYP. PLAN Ell T-10 1/2" JL JL ELEVATION 2'- 1/2" 1 V-4-' JL---JL END VIEW 8. LIFrING INSERI STARCON 10XS X 13" (4) PLACES TYP. 21'-8" - I -A .. - I W PLAN 9 1/2" -_r-�9 1/2" 11 18, F1 F:VATTnN 1. ?.I a 3" jJL JL 1 2'-2 1/2" - la 4' 1'-91/2- END VIEW I � A 2'-4.1/2- 7-2 1/2" V-6" 19'-8" 4" PLAN II-o (FOR APALED PIPE RENETRATION) 1, -4" INLET SIDE IF-@ IF-lkfA9rVJ%MLff UFTING INSERT STARCON IOS X 13" (2) PLACES TYP. nNG INSERT 3'-J��S�ARCON 10S X 6" f4 8"� (4) PLACES TYP. 1- f 6" 9--7" IrILBff% lovirsaff 4" 19'-8" LIFFING INSERT STARCON 10S X 6" (4) PLACES TYP. OUTLET SIDE 01'-4" OUrLET HOLE ELEVATION 51 JL 11-6n Y-10" V-2 1/2" F:FJn VTr-W 9'-7" i c DI E A Bl Cl 0 c 6 iz #5 Rebar Cob 12" O.C. #5 Rebar Ca) 12" 0. C, REINFORCING SECTION 1 (1 511 C-1 R tl-N-n-) UA I LAI BARS I PIECE L-OO, NOTES: 1. NUMBER OF ADD'L REIN. BARS AT EA. SIDE OF OPENING SHALL EQUAL HALF THE NUMBER OF INTERRUPTED BARS IN EA. LAYER OF REIN. 2. SIZE OF ADDITIONAL BARS TO EQUAL SIZE OF INTERRUPTED REINF. BARS. 3. PROVIDE STD. HOOK FOR BARS IF LAP LENGTH EXTENSION CANNOT BE OBTAINED AT JOINTS OR OTHER OBSTRUCTIONS. PLACE ADD'L BARS IN SAME PLANES AS INTERRUPTED REINF. 4. DIAGONAL BARS SHALL BE #4 BARS. LOCATE DIAGONALS IN EACH LAYER OF REINF. 5. PLACE DIAGONAL BARS INSIDE NORMAL REINF. 6. ALL REINF. TO CLEAR OPENING OR FLANGE COLLARS BY 1" 0 . SIZE MIN LAP #13] 21" [5331 #16] 26"[6601 #19] 31"[7871 �#22] 36"[914] '#251 46" [1168] '#29] 58"[14731 [#301 73"[1854] A B- B A100 BARS MIN. LAP mp.) SEE NOTE 3 TYPICAL HOLE REINFORCING "S'/2 r4 —:, a. INTERRUPTED NORMAL REINF. (TYP.) `—ADDITIONAL BARS SEE NOTE 1 (TYP.) INTERRUPTED NORMAL REINF. (TYP.) REINFORCING CHART (3—SIDED STRUCTURE) MARK SIZE SPACING As Prov. By Barin A2/ft. LENGTH TYPE A B Al #7 6" 1.20 13'-4" L-Bar 4'-0" 9-4" A100 #7 6" 1.20 211-8" Bent -Bar 19'-4" 11-211_ A300 #7 6" 1.20 19'-4" Straight Bl #6 12" 0.44 9'-4" Straight cl #4 1 12" 0.20 9'-6" Straight cloo #5 6" 0.62 9'-6" Straight 1 Dl #4 1211 0.20 4'-4" Bent -Bar 1311 2611 1 ISM"ITE (W) 671-2251 1-600-gM-2251 F": (350) 571-0790 - 0 9/27/05 —.1 .1. CHA --'-; 9/27/05 ...... KL XLV CHECKED BY: CHA DATE: 9/27/05 1 o1w X 3WIL X 8.-9'H 0 SCALI SHEET: 12 ISSUE FOR ENGINEERING PROJECT: EOMONIMS COWER CUSTOMER: FOR THE ARTS INTERWEST 0 E 0 4; Capaciti( Starcon SC-3 Lifting Body w/ Eyelink TEPRECASTING & CONERETE 11VC. �W 1116 �U"IW VUR, 11LUN11", *� MH (3W) 871-2251 1-�-aDS-2251 FAX. (36D) 671-0790 Please follow the instructions outlined below to insure a smooth installation of your 3 Sided Bridge: 1. Make sure that sub -base is prepared for installation. The bases should be placed on undisturbed soil leveled with 4 to 6 inches of pea gravel or 3/8" +/- compacted rock. Allow for soil PSI Requirements as specified per Engineering Calculations. 2. If the base is not cast in place, set footings or base slab. 3. Make sure that crane meets required maximum weight pick. Rig and set first required piece. 4. Accurate alignment of bases is critical for proper fit of 3 sided pieces. 5. Place (Korolath Shims or equal) in keyway to insure proper grouting. Center leg of 3 sided piece in keyway (from side to side). Make sure that the edge of the 3 sided piece is set flush to edge of end wall key way. See detail below. 6. Continue setting consecutive pieces. Make sure that pieces are aligned in the center of keyway. Set pieces as close together as possible. 7. Grout 3 sided and base slab keyway, per drawing requirements. Materials Wt Lbs Vol CF.FT SSD Cement Factor Sacks Typ W/C Water 4.81 300 9.0 I/H .35 Cement 4.30 8.46 6" Slump +/- 1 " 3/16 Max Agg Fine Agg 17.89 2990 ADMIX 8.5 Lbs. INNERPLAST N (DISCLAIMER: THIS IS A GUIDELINE ONLY - FACTORS SUCH AS SAND AND AGGREGATE COULD AFFECT THE MIX - AS WELL AS TEMP. 8. Allow allotted cure time, per grout specifications, to insure required PSI. 9. Backfill and compact in 12" lifts. Base Slab I i " r- ­4 to Inside Edge of End Wall Key Way End Wall Detail DRAWN BY: JJB UAIL: 08/11/04 WKUL;1UKt CHECKED BY: jp DATE: 08/11/04 SCALE: SHEET: 14 PROJECT: CUSTOMER: ISSUE FOR APPROVAL End Wall End Wall Key Way 0 ill -Oil WULD419. r7 QPAIN LINK GATE CO ll/A420 Z�l 3 A420 C14 SLA8 zzzz:r 1�p PT WOOD ENCLOSURE FENCE A CHAIN LINK GATE 2 ,ecy Cie C lie on greajefitiosure GAY age) recY Cie c d Oy: c Z::> t> Siz djo6ation app�ovt 41501f e MYCI16g Cool 0111 cycII69 Cool us,' A DUMPSTER ENCUOISURE PLAN pin- site \t2 0 1111 pin-site SCALE: 1/4 nr vi GATE POST ALI NS 3 WITH OF TIMBER POST BEYONUI-' AIKI ATE' U I - "I'll, - "I . I -11. ­1 ;�l ;, I f --IZL ,� " - 1� , ,� 1. AH WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE PLANS AND 1. EXCAVATION, FILL, AND GRADING SHALL CONFORM TO THE 2000 SPECIFICATIONS, CITY DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS EPARTMENT OF TRANSPORTATION 2004 STANDARD CIFICATIONS, UBC APPENDIX 33, 1997 SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION - (WSDOT) EDITION, AND CITY REQUIREMENTS. WORK SHALL PROCEED TO THE FINISHED SURFACES AT THE El FVA-11ONS AND CONTOURS SHOWN ON 2. PRIOR TO ANY SITE CONSTRUCTION TO INCLUDE CLEARING/LOGGING OR GRADING THE DRAWINGS. THE sITEAOT CLEARING LIMITS SHALL BE LOCATED AND FIELD IDENTIFIED. 2. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVA 3. ALL WORK WITHIN THE SITE AND CITY RIGHT-OF-WAY (R.O.W.) SHALL BE SUBJECT CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TO THE INSPEC11ON OF THE CITY INSPECTOR OR A DESIGNATED REPRESENTATIVE. VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY PRIOR TO ANY SITE WORK, THE CONTRACTOR SHALL CONTACT THE ENGINEERING ADD111ONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH EXISTING DIVISION AT (425) 771-0220 ext 1326 TO SCHEDUIF A PRE CONSTRUCTION UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL ANGES (REVISIONS) WIH REQUIRE ENGINEERED AS-BUILTS BE NOTIFY THE ENGINEER AND RED SHALL BE SUPPLIED PRIOR TO SITE APPROVAL. APPROVED BY THE ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE PROJECT. 4. THE TEMPORARY EROSION/SEDIMENTATION CONTROL MEASURES SHALL BE ANY GRADING OR EXTENSIVE LAND Cl FARING IN EROSION/SEDIMENTA-nON CONTROL PLAN. THE CONTRACTOR IS RESPONSIBLE TO SATISFACTORILY MAINTAIN THESE FACILITIES UNTIL CONSTRUCTION AND LANDSCAPING IS COMPLETE AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 5. TRENCH BACKFILL OF NEW UTILITIES AND STORM DRAINAGE FACILITIES SHAH BE COMPACTED TO THE PERCENTAGE OF MAXIMUM DENSITY (MODIFIED PROCTOR) AS INDICATED ON THESE PLANS. ALL PIPES SHALL BE PROPERLY BEDDED AND THE LL BE CONTROL DENSITY FILL (2 SACK MIX). 6. NONCOMPLIANCE WITH EROSION CONTROL REQUIREMENTS, WATER QUALITY REQUIREMENTS, OR CLEARING LIMITS MAY RESULT IN VIOLATIONS AND/OR REVOCATION OF PROJECT PERMITS, PLAN APPROVAL, AND BOND FORECLOSURES. 1. UNIESS OTHERWISE NOTED, ALL STORM DRAINAGE (SD) PIPE SHALL BE CORRUGATED HIGH DENSITY POLYETHYLENE PIPE (CPEP) WITH SMOOTH INTERIOR * CPEP SHALL BE ADS N-12 OR HANCOR HI-1 OR EQUAL AS APPROVED BY THE CITY PRIOR TO CONSTRUCTION. WHERE OTHER PIPE IS INDICATED, IT SHALL BE REINFORCED CONCRETE PIPE (RCP), ASTM C-14 (24- DIAMETER AND LARGER TO BE REINFORCED ASTM C-76), OR CORRUGATED METAL PIPE (CMP). CMP TO BE GALVANIZED STEEL WITH TREATMENT 1 ASPHALT COATING OR BETTER. AH RCP AND CMP SHAH HAVE RUBBER GASKETS. MINIMUM COVERAGE REQUIREMENTS FOR PIPE SHAH BE PER MANUFACTURER'S REQUIREMENTS. 2. ALL PIPE SHAH BE PLACED ON STABLE EARTH, OR IF THE EXISTING FOUNDATION IS UNSATISFACTORY, THE CONTRACTOR SHALL OVER EXCAVATE AND ' BACKFILL NTH A GRAVEL MATERIAL AS NECESSARY TO SUPPORT THE PIPE. 3. PIPE BACKFILL SHAH BE PLACED EQUALLY. ON BOTH SIDES OF THE PIPE OR PIPE -ARCH IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6", MAXIMUM DEPTH 8", THOROUGHLY TAMPING EACH LAYER. THESE COMPACTED LAYERS MUST EXTEND FOR ONE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE AS SHOWN ON THE PLANS AND INDICATED IN THESE AND THE REFERENCED SPECIFICATIONS. 4. ALL GRATES (INLET AND CATCH BASIN) SHALL MATCH PAVEMENT/CURB ELEVATIONS AND SHALL BE VANED. ' 5. ALL CATCH BASINS SHALL CONFORM TO WSDOT STANDARD TYPE 1, UNI ESS OTHERWISE NOTED. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING ALL MANHOLE, INLET, AND CATCH BASIN FRAMES AND GRATES JUST PRIOR TO POURING OF CURBS AND PAVING. 7. ALL CATCH BASINS WITH A DEPTH OVER 5.0 FEET TO THE FLOW LINE SHALL BE A TYPE 2 CB. 8. ALL CATCH BASINS SHALL HAVE LOCKING LIDS. I . 9. STANDARD POLYPYROPLENE LADD - ER STEPS SHALL BE PROVIDED IN ALL CATCH BASINS/MANHOI FS EXCEEDING 5 FEET IN DEPTH. 10. CATCH BASINS SHALL HAVE STANDARD CAST IRON FRAME AND GRATES AND SHALL BE EAST JORDAN IRONWORKS OR APPROVED EQUAL 11. All STORM DRAIN WORK MUST BE STAKED FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. I . 12. STORM DRAINAGE STUB OUTS SHALL BE MARKED WITH A 2X4 AND LABELED "STORM". LOCATIONS OF THESE INSTALLATIONS SHALL BE D DRAWINGS. -AND SUBMITTED TO THE CITY. TION/DETENTION FACILITIES, STORM DRAINAGE PIPE AND CATCH BASINS SHALL BE FLUSHED AND Cl FANED PRIOR TO CITY OF EDMONDS ACCEPTANCE. . 14. PRIOR TO ANY SITE WORK PERTAINING TO DRAINAGE, THE CONTRACTOR SHALL CONTACT THE CITY OF EDMONDS TO SCHEDULE AN INSPECTION. 1 15. THE DRAINAGE SYSTEM SHALL BE INSTALLED IN ACCORDANCE NTH THE APPROVED PLAN. . 16. ONE SET OF APPROVED DRAINAGE PLANS SHALL BE ON -SITE AT ALL 11MES FOR DRAINAGE INSPECTION. AINAGE SYSTEM SHALL BE COVERED, CONCEAl ED, OR PUT INTO USE UNTIL IT HAS BEEN TESTED, INSPECTED, AND ACCEPTED BY THE CITY. 18. STENCIL STORM DRAIN GRATES WITH "DUMP NO WASTE, DRAINS TO STREAM". 1. SILTATION BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT I FAST DAILY DURING PROLONGED RAINFALL CLOSE ATTENTION SHAH BE PAID TO THE REPAIR OF DAMAGED BALES, END RUNS AND UNDERCUTTING BENEATH BALES. NECESSARY LI PTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL THEY MUST BE REMOVED WHEN THE I EVEL OF DEPOSITION REACHES APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE STRAW BALE BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. A SOCK FILTER SHALL BE PLACED INSIDE ALL ONSITE CATCHBASINS EXISTING AND NEW. 1. ALL SITE WORK MUST COMPLY TO APPENDIX 33 OF THE UNIFORM BUILDING CODE. (1997 EDITION). . 2. THE TEMPORARY EROSION AND SEDIMENTATION CONTROL SYSTEM SHALL BE INSTALLED AND INSPECTED BY THE ENGINEERING INSPECTOR PRIOR TO ALL OTHER CONSTRUCTION. . . 3. IF CUT AND FIH SLOPES EXCEED A MAXIMUM OF TWO FEET HORIZONTAL TO ONE FOOT VERTICAL, ETAINING WALL MAY BE REQUIRED. ALL ROCK RETAINING WALLS GREATER THAN FOUR (4) FEET IN HEIGHT ARE TO FOLLOW CITY SPECIFICATIONS AND TO BE DESIGNED AND CER11FIED BY A CIVIL ENGINEER EXPERIENCED IN SOILS MECHANICS. 4.THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS REQUIRED BY THE CITY ENGINEER TO ENSURE CONTINUING EROSION/SEDIMENTATION CONTROL UNTIL COMPLETION OF THE PROJECT. 5. AH DISTURBED LAND AREAS SHALL BE STABILIZED AS REQUIRED BY THE CITY OF EDMONDS. SEE SHEET C-2 6. STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND ADEQUATELY PROTECTED BY VISQUENE AND SANDBAG ANCHORS TEMPORARY SEEDING AND MULCHING. HYDROSEED PREFERRED. 7. THE PUBLIC ROW SHAH BE KEPT Cl FAN. TRACKING OF MUD AND/OR DEBRIS FROM THE SITE WILL RESULT IN WORK STOPPAGE. 8. REMOVE ALL EROSION CONTROL MEASURES WHEN ENTIRE S`��) STABILIZIED. . � _� - - A .. 11 9kdwgXxe-cov.dwg, 07/18/2005 01:49:04 PM 1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF EDMONDS STANDARD SPECIFICATIONS, AND WSDOT/APWA STANDARD SPECIFICATIONS, LATEST EDITION. 2. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL ONFERENCE NTH THE CITY OF EDMONDS CONSTRUC11ON INSPECTOR. . 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. ALL SANITARY SEWER IMPROVEMENTS SHAH BE CONSTRUCTED IN ACCORDANCE WITH THESE APPROVED PLANS. ANY DEVIATION FROM THESE PLANS WILL REQUIRE APPROVAL FROM THE OWNER, ENGINEER AND APPROPRIATE PUBLIC AGENCIES. 3. MATERIALS EXCAVATED IN AREAS REQUIRING CUT GRADING MAY BE USED AS FIH IF THEY MEET THE REQUIREMENTS FOR FILL MATERIAL 5. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OUTLINED BELOW. NO BOULDERS, CONCRETE OR ASPHALT CHUNKS OBTAIN RIGHT OF WAY AND ANY OTHER RELATED PERMITS PRIOR TO ANY GREATER THAN 4" IN ITS LARGEST DIMENSION MAY BE USED. SUCH CONSTRUCTION ACTIVITY. . MATERIAL SHAH BE DISPOSED OF OFF -SITE. . . 6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN HEREON HAVE BEEN 4. AFTER CLEARING & GRUBBING IS COMPI ETE, THE GROUND SURFACE 'OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE S FOLLOWS: CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. . IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO A. ALL AREAS TO BE SURFACED NTH PAVEMENT, CONCRETE, WALKS INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS OR STEPS, AND BUILDING SLABS SHAH HAVE THE TOP 12" OF SHOWN AND TO FURTHER DISCOVER AND AVOID ANY OTHER U11LI11ES EXISTING SOILS STRIPPED AND RECOMPACTED TO AT LEAST 95% NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION M TY DETERMINED BY ASTM D-1557 OF THIS PLAN. THE CONTRACTOR SHAH CONTACT THE UNDERGROUND . I (MODIFIED PROCTOR). � * UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 1 HOURS PRIOR TO CONSTRUCTION. THE OWNER OR HIS B. PRIOR TO,' RELC,OMPACTION OF THE STRIPPED MATERIAL ALL . TI E ENGINEER SHALL BE CONTACTED AREAS SHALL BE PROOF ROLI ED IN THE PRESENCE OF THE IMMEDIATELY IF A CONFLICT EXISTS. GEOTECH NI CAL. ENGINEER OF THE OWNER'S CHOICE. ANY AREAS � DEEMED UNSUITABLE BY THE GEOTECHNICAL ENGINEER SHALL 13E 7. ALL MANHOLES SHALL BE PER CITY OF EDMONDS STANDARD DETAIL OVEREXCAVATED AND REPLACED WITH COMPACTED .FILL MATERIAL E6.1 WITH ECCENTRIC- CONES AND ONE (1) INCH SAFETY STEPS. . RICE BASED ON TRUCK MEASURE OF ALL BE THE -EAST* JORDAN IRONWORKS NO. MH30, I � . . � . SOLID LID WITH ONE (1) INCH HOI E, OR EQUAL, AND SHALL READ 5. IMPORTED',FILL SHALL BE FREE -DRAINING GRANULAR MATERIAL "SEWER". ALL MANHOLE COVERS SHAH NOT BE ADJUSTED TO FINISH WITHOUT ORGANICS, AND SHAH CONFORM TO WSDOT SECTION 9-03.10 GRADE PRIOR70 FINAL PAVING. . FOR GRAVEL BASE, 9- . MATERIAL APPROVED BY THE ENGINEER IN WRITING PRIOR TO ITS 8. AH SEWER PIPE SHALL CONFORM TO ONE OF THE FOLLOWING USE. FILL SHAI L HAVE NO MORE THAN 5% PASSING THE #200 SPECIFICATIONS: SIEVE. � I A. DUCTILE IRON - CLASS 52 (ONLY 6. SUBMIT SAMPLES OF PROPOSED FILL MATERIAL FOR TESTING FOR THE THE PLANS). DETERMINATION OF THE OPTIMUM MOISTURE - DENSITY RELATIONSHIP * -71557 ,(MODIFIED PROCTOR), PRIOR TO ANY FIH ING OR B. POLYVINYL CHORIDE, SDR 35 I � i (PVC), NTH CONFORMING TO ASTM DESIGNATION D3034 WITH . : I RUBBER GASKET JOINTS. 7. PLACE Fill IN� 10" THICK MAXIMUM LIFTS (LOOSE) AND COMPACT TO 95% OF THE MAXIMUM DRY DENSITY PER ASTM D-1557 (MODIFIED C.SAND COLLARS ARE REQUIRED FOR ALL PVC PENETRATIONS PROCTOR). INTO CATCHBASINS AND MANHOLES. � 8. COMPACT ALL FILL USING SUITABLE COMPACTION EQUIPMENT. 9. ALL DUCTIIF IRON PIPE SHALL HAVE AN APWA CLASS "B" PIPE BEDDING. ALL PVC PIPE SHAH HAVE AN APWA CLASS "F" (5/8 -ru 11 Ll rNO Cf%ADlCV Tin nOV Cnil C AC U. muu mvl_llUrl%r_ 1v F_ ov NECESSARY TO ACHIEVE SPECIFIED COMPACTION. 10. CONTRACTOR IS RESPONSIBLE FOR SOIL AND COMPACTION TESTING IN 10- SE SPECIFICATIONS. 11. SOILS MAY ALSO BE TESTED BY OWNER. � . . LL STR . IP AND RE -COMPACT ALL SOILS NOT MEETING SPECIFIED COMPACTION AT NO ADDITIONAL COST TO OWNER. 13. FOR PLACEMENT OF BALLAST, GRAVEL BASE, AND/OR CRUSHED SURFACING BENEATH ASPHALT CONCRETE PAVING (ACP), REFER TO THE TYPICAL PAVEMENT SECTION SHEET C-6. . wam-aism, owu*m . . . 1. ALL . MATERIALS SHALL BE NEW AND UNDAMAGED. UNLESS OTHERWISE APPROVED BY THE ENGINEER, THE SAME MANUFACTURER OF EACH ITEM il. SHAH BE USED THROUGHOUT THE WORK. CONTRACTORS SHALL FURNISH A WA.'TERTIGHT PLUG OF THE APPROPRIATE SIZE WHICH SHALL BE INSTALLED IN THE END OF THE WATER MAIN ANYTIME WORK IS DELAYED OR STOPPED. . , . 2. NO CONNEC/lION TO THE EX13TING MAINS WILL BE ALLOWED EXCEPT NTION' DEVICE PRIOR TO SATISFACTORY FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF INCH MINUS CRUSHED ROCK) FLEXIBLE PIPE BEDDING. PIPE TRENCH BACKFILL SHALL BE BANK RUN GRAVEL IF, IN THE OPINION OF THE DIRECTOR, EXISTING TRENCH EXCAVATION SOILS ARE UNSUITABLE. BANK RUN GRAVEL SHALL BE FROM A PIT APPROVED BY THE DIRECTOR AND SHALL BE AS SPECIFIED IN SECTION 9.03.10 OF THE STANDARD SPECIFICATIONS. EACH LAYER O 95% IN PAVED AREAS AND 90% IN UNPAVED AREAS IN ACCORDANCE WITH ASTM D1557 IN LIFTS NOT TO EXCEED EIGHTEEN (18) INCHES. THE MAXIMUM PARTICLE SIZE SHAH NOT EXCEED SIX (6) INCHES OR 2/3 THE DEPTH OF THE LAYER BEING PLACED, WHICHEVER IS LESS. All PIPE SHALL BE LAID ON THE FIRM EARTH AND BEDDED WITH C ' ITY STANDARDS. BEDDING IN ALL OTHER SOILS MUST BE APPROVED BY THE CITY ENGINEER. ALL TRENCHES SHALL BE FREE OF WATER AT THE TIME OF INSPECTION. WHEN TAPPING INTO A SEWER MAIN OTHER THAN CLAY PIPE, CORE DRILLING IS REQUIRED AND MUST. BE DONE BY A LICENSED SPECIALTY CONTRACTOR. THIS PROCEDURE MUST BE INSPECTED BY THE ENGINEERING INSPECTOR. ALL CONTRACTORS TAPPING INTO SEWER MAINS EIGHT INCHES IN DIAMETER OR GREATER, MUST USE INSERTA-TEES, ROMAC SADDLES NTH STAINLESS STEEL BANDS OR . ' APPROVED EQUALS. AH SADDLES SHALL BE DOUBLE DANDLI). A ROLL -IN WYE IS REQUIRED WHEN CONNECTING TO SIX-INCH DIAMETER LATERAL LINES. IN THE EVENT THAT THE SEWER MAIN IS BROKEN SATISFACTORY BACTERIOLOGICAL TEST RESULTS. WHILE TAPPING, THAT SEC71ON WILL BE REPLACED AT THE . I E AND SHALL BE INSPECTED BY THE 3. TAPS UP TO 2" ON THE EXISTING MAINS WILL BE DONE BY THE CITY ENGINEERING INSPECTOR PRIOR TO BACKFILLING. WHEN CONNECIING OF EDMONDS F�U ENT. LINE SIZES GREATER THAN 2" TO CLAY PIPE, THE CONTRACTOR SHALL REMOVE A SECTION OF PIPE, SHALL BE DONEBY A QUALIFIED COMPANY WHO SPECIALIZES IN. WATER INSTALL A PVC TEE WITH EXTENSIONS AND CONNECT PVC TO CLAY TAPS AND WATER MAIN INSTAH ATIONS. USING ROMAC COUPLINGS. THE CONTRACTOR SHALL INSURE PROPER � TI ALL PIPE AND CONNECTIONS. IT IS THE 4. ALL WORK AND MATERIALS MUST CONFORM TO CITY OF EDMONDS CONTRACTOR'S RESPONSIBILITY TO OBTAIN AND FOLLOW CITY OF STANDARDS. PECIFICATIONS AND REQUIREMENTS PRIOR TO CONSTRUCTION. 5. THE CITY OF EDMONDS ENGINEERING INSPECTOR MUST BE NOTIFIED AT I LEASE 24 HOURS PRIOR TO COMMENCING CONSTRUCTI-ON. 12. WHERE A WATER MAIN CROSSES ABOVE THE SANITARY SEWER, AND I I ESS THAN 1.5 FEET OF VERTICAL CLEARANCE EXISTS BETWEEN THE 6. THE OWNER'S AUTHORIZED AGENT SHALL NOTIFY THE CITY OF EDMONDS TOP OF SEWER AND BOTTOM OF WATER MAIN, THE SEWER SHALL BE ENGINEERING DIVISION WITH A PERSON NAME WHO CAN BE CONTACTED TI, IRON PIPE,(CLASS REGARDING PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS. 52) FOR A MINIMUM HORIZONTAL DISTANCE OF ONE CONTINUOUS EIGHTEEN (18) FEET NOMINAL PIPE ACROSS THE WATER MAIN 7. THE CONTRACTOR SHALL NOT OPERATE ANY CITY WATER VALVES. ANY CROSSING WITH NO JOINTS. E COORDINATED THROUGH THE ENGINEERING INSPECTOR PER CITY POLICY GUIDELINES FOR THIE- PLANNED OUTAGE. 13. SANITARY SEWER MAIN UNES EIGHT (8) INCHES IN DIAMETER AND START AT 9 A.M. AND TERMINATE AT 3 P.M. LARGER SHALL NOT LOSER THAN TEN (10) i FEET TO ANY BUILDING OR WATERMAN. 8. THE FIRE LINE SHALL BE TESTED FROM THE MAIN TO THE DDCVA BY . THE CITY OF'EcDMONDS ENGINEERING DEPARTMENT AND FROM THE VAULT 14. OUTSIDE DRAINS, FOOTING DRAINS AND/OR DOWNSPOUTS SHALL NOT TO THE BUILDING BY THE FIRE DEPARTMENT. I . � BE CONNECTED TO THE SIDE SEWER SYSTEM. 9. THE FIRE HYDRANTS SHALL BE TESTED AT 200 psi. CALL ENGINEERING S TO EXISTING FACILITIES SHAH BE SEALED OFF INSPECTION LINE FOR INSPECTION. � UNTIL UPSTREAM CONSTRUCTION IS FINISHED, TESTED, Cl FANED AND � I ACCEPTED. ALL CONSTRUCTION DEBRIS AND WATER SHALL BE ) REMOVED PRIOR TO OPENING THE SEAL ALL TV INSPECTION AND PRESSURE TESTING SHALL BE IN THE PRESENCE OF A CITY OF . EDMONDS INSPECTOR. CONTRACTOR GENERAL N THIS PLAN SHEET IS NOT INTENDED TO SHOW ALL ITEMS TO BE CONSTRUCTED. THE CONTRACTOR IS DIRECTED TO REVIEW ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, AND THE FOLLOWING CIVIL SHEETS FOR ADDITIONAL CONSTRUCTION ITEMS. SEWER AND WATER SYSTEM INFORMATION: CONTRACTOR IS CAU11ONED THAT POTENTIAL CONFLICTS NTH EXISTING UNDERGROUND UTILITIES AND STRUCTURES EXIST. ESS POINTS (MANHOI ES) AND WATER LINE ANGI F POINT LOCATIONS ARE PROVIDED BASED ON AVAILABLE INFORMATION AND MAY REQUIRE MINOR ADJUSTMENTS. CONTRACTOR SHAH N01IFY OWNER OF CONFLICTS ENCOUNTERED. AH SEWER AND WATER IMPROVEMENTS SHAH COMPLY WITH CITY OF EDMONDS DESIGN AND CONSTRUCTION STANDARDS. UNLESS OTHERWISE INDICATED, ALL SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) OINTS. DOMESTIC WATER SERVICE PIPE OR POLYETHYLENE (PE) SDR-7-PE 3408 NTH A MINIMUN OF 160 PSI RATING, AND SHALL CONFORM ESSURE REDUCING VALVES MAY BE REQUIRED TO COMPLY NTH MAXIMUM PRESSURES ALLOWED BY THE UNIFORM PLUMBING CODE. DRAINAGE SYSTEM INFORMATION CONTRACTOR IS CAUTIONED THAT POTENTIAL CONFLICTS WITH UND UTILITIES AND STRUCTURES EXIST. PROPOSED CATCH BASIN LOCATIONS ARE PRO\ADED BASED ON AVAILABLE INFORMATION AND MAY REQUIRE MINOR ADJUSTMENTS. CONTRACTOR SHALL NOTIFY OWNER OF CONFLICTS ENCOUNTERED. DETEN11ON SYSTEM, CATCH BASINS, FRAMES, GRATES, MATERIALS AND INSTALLA11ON METHODS SHALL COMPLY NTH CITY OF ARDS. 16. A TEN (10) FOOT SANITARY SEWER EASEMENT, 5 FEET EACH SIDE. 17. PRIOR TO ACCEPTANCE OF CONSTRUCTION AND/OR ISSUANCE OF OCCUPANCY PERMITS, SURVEYOR -CERTIFIED AS -BUILT MYLAR DRAWINGS MUST BE PREPARED OF ALL PUBLIC SANITARY SEWER FACILITIES. . 18. A MANHOLE IS REQUIRED WHEN CONNECTING LINES 8 INCHES OR GREATER IN SIZE TO SEWER MAINS. ' 19. SIDE SEWERS SHALL NOT BE INSTALI ED AT LESS THAN 2% NOR ADE WITHOUT PRIOR WRITTEN APPROVAL BY � THE CITY ENGINEER. � 20. SIDE SEWERS SHALL NOT BE INSTALLED CLOSER THAN 24 INCHES FROM A BUILDING AT ANY POINT. CLEANOUTS SHALL BE INSTAH ED ON EACH PLUMBING LINE EXITING THE BUILDING (WITHIN 2 FEET OF THE BUILDING). I I . 21. SIDE SEWERS NTH IESS THAN 24 INCHES OF COVER BELOW DRIVEABLE SURFACES SHAH BE CONSTRUCTED OF DUCTILE IRON OR- UIVAI ENT. 22. ALL TRENCHES DEEPER THAN FOUR FEET MUST EITHER BE SHORED OR DAYLIGHTED IN ACCORDANCE WITH ALL WASHINGTON STATE SAFETY REGULATIONS. THE CITY OF EDMONDS W`IH NOT INSPECT A SIDE SEWER OR MAIN LINE INSTALLATION UNTIL THIS COND17IONS IS I D/OR OWNER IS ALSO LIABLE FOR SHORING AND CONDITIONS AROUND A RESIDENT'S PROPERTY AND ANY DAMAGES THAT MAY OCCUR IN THE INSTAH ATION OF A SIDE SEWER I . ASSOCIATED NTH THAT PROPERTY. OM SIDE SEWERS A MINIMUM OF TEN FEET HORIZONTAL! Y AND THREE FEET VERTICALLY. WHEN IT IS NECESSARY TO CROSS A SIDE SEWER OVER A WATER LINE, PROVIDE A TWENTY FOOT LONG SLEEVE AROUND THE SEWER SERVICE, CENTERING THE SI FEVE ON THE SIDE SEWER. BOTH ENDS OF THE DUCTILE IRON PIPE SHAH BE SEALED. . ' 24. SIDE SEWER PERMITS ISSUED SEPARATELY, BUT CAN BE OBTAINED AT THE 11ME OF THE BUILDING PERMIT WITH BUILDING PERMITS WILI EXPIRE NTH THE MAIN BUILDING PERMIT. ALL OTHER PERMITSie (I.E., � REPAIRS, REPLACEMENTS) EXPIRE 60 DAYS FROM THE DATE OF . ISSUANCE. I SITE NOTES I 18.30.050 DEVELOPMENT APPROVAL STANDARDS FOR EROSION AND ! I .." I OL (ESC) PLAN. I SITE ADDRESS: . .1 - . A. ESC MINIMUM REQUIREMENTS. ALL ACTIVITIES NECESSITATING A 6TH AVENUE AND DALEY STREET EDMONDS, WASHINGTON - - -'- 1 96TH S CLEARING OR GRADING PERMIT AND ALL UTILITY PROJECTS I I 'r- . �'_--,� 1/� CONSIS71NG OF MORE THAN 500 LINEAL FEET OF TRENCH EXCAVATION TAX ACCOUNT NO.: I ., ALEY, eT-"'- 9 i SHAH BE REQUIRED TO CONTROL EROSION AND SEDIMENT DURING I I V "ili .141., !,��- %."'-­ TI ERMANENTLY STABILIZE EXPOSED SOIL ZONING: >�,, "I - ­e.... .., ,;vz< 1_� I , IN ST i JA 9212TH ST 212TH S IT T UCTION. PROJECTS INVOLVING A CRITICAL -P- (PUBLIC USE) �!, I � 'k 1 , . ... <; _ I SITE BE REQUIRED TO COMPLY WITH ANY COMBINATION OF il 1. � ! i I THE ESC MINIMUM REQUIREMENTS. COMPLIANCE WILL BE ZONING AGENCY- .1 .. i =i L­ H THE IMPLEMENTATION OF AN APPROVED ESC CITY OF EDMONDS - DEVELOPMENT SERVICES DEPARTMENT -- ",',,.- 6! I . . PLAN. GUIDELINES FOR PREPARING ESC PLANS ARE PROVIDED IN THE PLANNING DIVISION _­ . 0 1 I MANUAL. THE PLAN MUST ADDRESS THE FOLLOWING REQUIREMENTS: 121 5TH AVENUE NORTH .1 - - � . I EDMONDS, WA 98020 . I � I 11 � 1. ESC MINIMUM REQUIREMENT - CONSTRUCTION ACCESS ROUTE. (425) 771-0220 I . CONSTRUCTION VEHICI F ACCESS SHALL BE, WHENEVER PRACTICAL, CODE ENFORCEMENT: JASON P. TOURTELLOT � EMAIL- tourtellot0cLedmonds.wc.us \11n MAP LIMITED TO ONE ROUTE. ACCESS POINTS SHALL BE STABILIZED WITH 111111m. V \-INITY USHED ROCK TO MINIMIZE THE TRACKING OF SETBACKS: \11� NOT TO selms SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO QUIREMENTS SUBJECT TO SITE PLAN REVIEW. ; A ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE CURRENT SETBACKS MAY DIFFER FROM THOSE IN EFFECT DURING � END OF'EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY OF EXISTING IMPROVEMENTS. FLOOD ZONE: SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL THIS SITE APPEARS ON NATIONAL FLOOD INSURANCE RATE MAP, DATED EDIMENT IS REMOVED IN THIS MANNER. NOVEMBER 8, 1999 , COMMUNITY PANEL NO. 53061C1305E. AND IS SITUATED IN ZONE -X-, AREA DETERMINED TO BE OUTSIDE THE 500 YEAR FLOODPLAIN. � 2. ESC MINIMUM REQUIREMENT - STABILIZATION OF EXPOSED AREAS. AH SOILS EXPOSED BY LAND DISTURBING ACTIVITIES SHALL BE BASIS OF BEARING - STABILIZED BY SUITABLE APPLICATION OF BMPS, INCLUDING, BUT CENTERLINE 6TH AVENUE HELD AT NORTH 00*11'28* EAST PER ALTA . NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, N, PROJECT NO. 01127, DATED NOVEMBER, 2001. � PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED; VERTICAL DATUM: I I .. � DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL THE CITY OF EDMONDS . EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED nMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR BENCHMARK: SANITARY SEWER MANHOLE "B" AS SHOWN ON CITY OF EDMONDS SEWER CARD .. . MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO INVERT ELEVAnON = 45.03- 1 FROM MAY 1 THROUGH SEPTEMBER 30). . AREA: 3. ESC MINIMUM REQUIREMENT - PROTEC11ON OF ADJACENT PROPERTIES. SITE AS SHOWN CONTAINS 120.327 SQUARE FEET OR 2.762 ACRES, � - I ADJACENT PROPERTIES SHAH BE PROTECTED FROM SEDIMENT MORE OR, LESS. . . . DEPOSITION BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, _. PARKING SPACE COUNT- . SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A PARKING SPACES TOTAL 47 INCLUDES .2 HANDICAP ACCESSIBLE SPACES. 1. I COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE BMPS. SUBSTRUCTURES: . BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORDS MAPS FURNISHED 4. ESC MINIMUM REQUIREMENT - MAINTENANCE. ALL EROSION AND BY OTHERS AND VERIFIED WHERE POSSIBLE BY FEATURES LOCATED IN THE SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND FIELD. WE ASSUME NO LIABILITY FOR THE ACCURACY OF THOSE RECORDS. . MAINTAINED BY THE OWNER TO ENSURE CON11NUED PERFORMANCE OF FOR. THE FINAL LOCATION OF EXISTING UTILITIES IN AREAS CRITICAL TO THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE DESIGN CONTACT THE UTILITY OWNER/AGENCY. . CONDUCTED IN ACCORDANCE WITH THE MANUAL TELECOMMUNICATIONS/FIBER OPTIC DISCLAIMER: , UND TELECOMMUNICATIONS AND/OR FIBER OPTIC 5. ESC MINIMUM REQUIREMENT - OTHER BMPS. AS REQUIRED BY THE LINES ARE NOT ALWAYS AVAILABLE TO THE PUBLIC. ALTHOUGH BRH HAS CITY, OTHER APPROPRIATE BMPS TO MITIGATE THE EFFECTS OF RCHED THE LOCAL JURISDICTION RECORDS, BRH HAS INCREASED RUNOFF SHALL BE APPLIED. THE MANY COMPANIES, IN THE COURSE OF THIS SURVEY, WHICH COULD HAVE UNDERGROUND LINES VAIMHIN ADJACENT RIGHTS - OF -WAY. THEREFORE, BRH DOES NOT ACCEPT RE%IONSIBILITY FOR THE 6. EROSION AND SEDIMENT CONTROL REQUIREMENT - UNDERGROUND EXISTENCE OF UNDERGROUND TELECOMMUNICATIONS/'FIBER OPTIC LINES UTILITY CONSTRUCTION. THE CONSTRUCTION OF UNDERGROUND WHICH ARE NOT MADE PUBLIC RECORD NTH THE LOCAL JURISDICTION. AS UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING: ALWAYS, CALL 1-800-424-5555 BEFORE CONSTRU',"TION. . . I UTILITY PROVIDERS: . A. EROSION CONTROL FOR EXCAVATED AND STOCKPILED MATERIALS; B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT SANITARY SEWERS, STORM DRAINAGE, WATER . WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT THE UPHILL SIDE OF TRENCHES; ENGINEERING DIVISION I C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT 121 5TH AVENUE NORTH TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE: MEANS); EDMONDS. WA 98020 (425) 771-0220 D. TRACKING AND SPIII ING OF MATERIALS ON STREETS DUE TO FAX- (425) 672-5750 HAULING; EMAIL:- gebert0ci.edmands.wc.us E. DAILY CLEANUP AND STREET MAINTENANCE. CONTACT. DAVID K. GEBERT, P.E., CITY ENGINEER . . . GRAPHIC SCMZ 7. ADDITIONAL ESC MINIMUM . REQUIREMENTS FOR LARGER DEVELOPMENTS. POWER SNOHOMISH COUNTY PUD . so THAT INCLUDES LAND 20 1802 75TH STREET SW . 0 10 I 1111111111111111111111� 20 40 I I DISTURBING ACTIVITIES OF GREATER THAN, OR EQUAL TO, ONE ACRE MAILING ADDRESS: m mj::miiil , - - IN ADDITION TO MEETING THE MINIMUM REQUIREMENTS SET FORTH PO BOX 11 07 1 mm ME BEEMM BEENEV40mom I � ABOVE SHALL COMPLY WITH ESC REQUIREMENTS LISTED BELOW. EVERETT, WA 98206 � (425) 347-4300 ( IN FEET ) i 1 inch = 20 ft. . 8. ESC MINIMUM REQUIREMENT - DELINEATE CLEARING AND EASEMENT TELEPHONE LIMITS. IN THE FIELD, MARK CLEARING LIMITS AND/OR ANY VERIZON � EASEMENTS, SETBACKS, SENSITIVE/CRITICAL AREAS AND THE . 2312 WEST CASINO ROAD EVERETT, WA 98204 . . . � BUFFERS, TREES AND DRAINAGE- COURSES. . . . (425) 356-4009 . . 9. ESC MINIMUM REQUIREMENT - SEDIMENT TRAPPING. PRIOR TO DESCRIPTION: LEAVING THE SITE, STORM WATER RUNOFF- SHALL PASS THROUGH A PARCEL A: . . . . SEDIMENT POND OR SEDIMENT TRAP, OR OTHER APPROPRIATE- BMPS. THAT PORTION OF GOVERNMENT LOT 2 AND THE NORTHWEST QUARTER OF THE THENCE NORTH 119.7 FEET, MORE OR LESS. TO THE NORTHEAST CORNER OF , SEDIMENT PONDS AND TRAPS, PERIMETER DIKES, SEDIMENT SOUTHWEST QUARTER OF SECTION 24. TOWNSHIP 27, NORTH, RANGE 3 EAST, EDMONDS HIGH SCHOOL TRACT AND THE TRUE POINT OF BEGINNING; . BARRIERS, AND OTHER BMPS INTENDED TO TRAP SEDIMENT ON -SITE OHOMISH COUNTY, W,A SHINGT(�,'% DESCRIBED AS .. . . . I . . AS A FIRST STEP IN GRADING. THESE BMPS I FOLLOWS: . � THENCE WEST, ALONG THE NORTH LINE OF SAID TRACT 336.3 FEET, MORE OR LESS, TO THE EASTERLY LINE OF 4TH STREET, AS NOW ESTABLISHED; SHALL BE FUNCT`IONAL BEFORE LAND DISTURBING ACTIVITIES TAKE BEGINNING AT THE NORTHEAST CORNER OF LOT 21, BLOCK 119. CITY OF . ONG THE EASTERLY LINE 70 FEET; I PLACE. EARTHEN STRUCTURES, AS DAMS,,DIKES, AND . EDMONDS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 2 OF THENCE EAST 336.3 FEET, MORE OR LESS. TO THE'WEST LINE OF 6TH .SUCH I DIVERSIONS SHALL BE SEEDED AND MULCHED ACCORDING TO -AN PLATS, PAGE 39, RECORDS OF SNOHOMISH COUNIN'... WASHINGTON, SAID I STREET PRODUCED; . � APPROVED TIMETABLE. CORNER BEING ON THE WEST RIGHT-OF-WAY MAR�;'iN OF 6TH AVENUE; THENCE SOUTH 70 FEET, MORE OR LESS, TO THE TRUE POINT OF . I BEGINNING. . THENCE NORTH 00*11'28" EAST ALONG THE WEST ,VGHT-OF-WAY MARGIN . . 10. ESC MINIMUM REQUIREMENT - CUT AND FILL SLOPES. CUT AND FILL OF 6TH AVENUE, AS SHOWN ON THE PLAT OF BRAI%,KETT*S FIRST ADDITION TOGETHER NTH LOTS 21, 22, 23, 24, 25, 26, 27, 28 AND THAT SLOPES SHAH BE DESIGNED AND CONSTRUCTED IN A MANNER THAT TO EDMONDS RECORDED IN VOLUME 8 OF PLATS, .r'AGE 47, RECORDS OF PORTION OF LOT 29 LYING EAST OF 4TH AVENUE NORTH, BLOCK 119. CITY WILL MINIMIZE EROSION. IN ADDITION, SLOPES SHALL BE SNOHOMISH COUNTY, WASHINGTON, 274.70 FEET TO THE NORTHEAST CORNER OF EDMONDS.. ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 2 OF OF EDMONDS HIGH SCHOOL TRACT, AS SHOWN ON SAID PLAT; PLATS, PAGE 39, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. STABILIZED IN ACCORDANCE WITH ESC REQUIREMENT NO. 2. . I . . � 2* wE5r ALONG THE NORTH LINE OF SAID TRACT SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. 11. ESC MINIMUM REQUIREMENT - CONTROLLING OFF -SITE EROSION. AND ITS WESTERLY EXTENSION, 339.62 FEET TO THE EAST RIGHT-OF-WAY TITLE REPORT REFERENCE: I 1. PROPERTIES AND WATER WAYS DOWNSTREAM FROM DEVELOPMENT SITES MARGIN OF 4TH AVENUE; THIS SURVEY WAS CONDUCTED ACCORDING TO THE DESCRIPTION SHOWN, SHALL BE PROTECTED FROM EROSION DUE TO INCREASES IN THE . THENCE THE FOLLOWING THREE COURSES AND DISTANCES ALONG SAID EAST FURNISHED BY FIDELITY NATIONAL TITLE COMPANY OF WASHINGTON, VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORM WATER RUNOFF MARGIN; COMMITMENT NO. 0171007. DATED SEPTEMBER 5 2002. THE EASEMENTS FROM THE PROJECT SITE. SHOWN OR NOTED HEREON RELATE TO THIS C&MITMIENT. THENCE SOUTH 00'17*41* EAST 31.89 FEET TO A POINT OF TANGENCY NOTE: EASEMENTS CREATED OR RESCINDED.AFTER THIS DATE ARE NOT 12. ESC MINIMUM REQUIREMENT - STABILIZATION OF TEMPORARY NTH A 223.09 FOOT RADIUS CURVE TO THE LEFT, I ON. ELS AND OUTLETS. ALL TEMPORARY ON -SITE NG SAID CURVE THROUGH A CENTRAL ANGLE OF . . . ELS SHALL BE DESIGNED, CONSTRUCTED AND 39*02'31m, A DISTANCE OF 152.02 FEET TO A POINT OF REVERSE . . STABILIZED TO PREVENT EROSION FROM THE EXPECTED VELOCITY OF CURVATURE NTH A 209.40 FOOT RADIUS CURVE TO THE RIGHT. . I FLOW FROM A TWO-YEAR, 24-HOUR FREQUENCY STORM FOR THE NG SAID CURVE THROUGH A CENTRAL ANGLE OF DEVELOPED CONDITION. STABILIZATION ADEQUATE TO PREVENT 31*37*49* A DISTANCE OF 115.60 TO THE NORTH LINE OF SAID BLOCK EROSION OF OUTLETS, ADJACENT STREAM BANKS, SLOPES AND 119; SHALL BE PROVIDED AT THE OUTLETS OF ALL CONVEYANCE SYSTEMS. THENCE NORTH 89*46'07* EAST ALONG SAID NORTH LINE. 242.45 FEET TO THE POINT OF BEGINNING, 13. 1 ESC MINIMUM REQUIREMENT - STORM DRAIN INI FT PROTECTION. ALL SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. STORM DRAIN INLETS MADE OPERABI F DURING CONSTRUCTION SHALL CIVIL SHEET INDEX TORM WATER RUNOFF SHALL NOT ENTER THE PARCEL B: . CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE THAT PORTION OF GOVERNMENT LOT 2. SECTION 24, TOWNSHIP 27 NORTH, I I NOTES SHEET SHT C1.1 . . TREATED TO REMOVE SEDIMENT. RANGE 3 EAST, W.M., RECORDS OF SNOHOMISH COUNTY, WASHINGTON, I .................................................... DESCRIBED AS FOLLOWS: . SITE DIMENSION PLAN ....................................... SHT C1.2 14. ESC REQUIREMENT - REMOVAL OF TEMPORARY BMPS. ALL TEMPORARY BEGINNING AT THE INTERSECTION OF THE EAST LINE OF 6TH STREET NTH I EROSION AND SEDIMENT CONTROL EIMPS SHALL BE REMOVED WITHIN- ,30 THE NORTH LINE OF GLEN STREET, AS SHOWN ON TIIE PLAT OF BRACKETT'S SITE DETAILS SHT C1.3 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE FIRST ADDITION TO EDMONDS, ACCORDING TO THE PLAT THEREOF RECORDED ..................................................... IN VOLUME 8 OF PLATS. PACE 47, RECORDS OF SNOHOMISH COUNTY. NO LONGER NEEDED. TRAPPED SEDIMENT SHALL WASHINGTON; DEMOLITION PLAN ............................................... SHT C1.4 BE� REMOVED OR STABILIZED ON SITE. DISTURBED SOIL AREAS I TI AL SHALL BE PERMANENTLY STABILIZED. THENCE RUNNING NORTH ALONG THE EAST LINE OF 6TH STREET, 90 FEET; EROSION CONTROL PLAN .................................. SHT C2.1 . THENCE EAST PARALLEL TO GLEN STREET, 195 FEET, 15. EROSION AND SEDIMENT CONTROL REQUIREMENT - DEWATERING GRADING & STORM DRAINAGE PLAN ................ SHT C2.2 CONSTRUC11ON SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO THENCE SOUTH PARALLEL TO 6TH STREET, 90 FEET TO THE NORTH LINE OF A SEDIMENT TRAP OR SEDIMENT POND. GLEN STREET; UTILITY PLAN ..................................................... SHT C2.3 THENCE WEST ALONG THE NORTH LINE OF GLEN STREET; 16. EROSION AND SEDIMENT CONTROL REQUIREMENT - CONTROL OF 195 FEET TO THE POINT OF BEGINNING. UTILITY PROFILES & DETAILS ............................ SHT C2.4 EDIMENT ON CONSTRUCTION SITES. ALL SITUATE IN THE COUNTY OF SNOHOMISH. STATE OF WASHINGTON. POLLUTANTS OTHER THAN SEDIMENT THAT OCCUR ON SITE DURING . CONSTRUC11ON SHALL BE HANDLED AND DISPOSED OF IN A MANNER PARCEL C: . FOLLOWING DESCRIBED TRACT- CONTAMINATION OF STORM WATER. THAT PORTION OF GOVERNMENT LOT 2. SECTION 24. TOWNSHIP 27 NORTH, 17. EROSION AND SEDIMENT CONTROL REQUIREMENT - FINANCIAL RANGE 3 EAST, W.M., RECORDS OF SNOHOMISH COUNTY, WASHINGTON, LIABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE DESCRIBED AS FOLLOWS: FINANCIAL INSTRUMENTS, SHAH BE REQUIRED FOR ALL PROJECTS TO BEGINNING AT THE INTERSECTION OF THE WEST LINE OF 6TH STREET AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT N STREET AS ESTABLISHED IN THE TOWN OF I CONTROL PLAN. [ORD. 3013 1, 1995]. EDMONDS, MICH POINT IS 633.55 FEET, MORE OF LESS, EAST AND 147.77 FEET, MORE OR LESS, NORTH OF THE QUARTER CORNER BETWEEN GRADING QUANTITIES SECTIONS 23 AND 24, FOR PERMITTING USE ONLY. APPROVED FOR c RUCTION , I , I W�l , _4 - � , 447/z /,n 6-0-P . Qt�_E_ngineer Date /�___ ei A v ,'&- �, '.' ��!-�'t,�,_-,---.----,------_'��-L-,--,,��,- Cag 2 Working Days Before You [Ag 1-800-424-%r)%r%A%rl%.#5 UMUw Underground Location Center . 0D,Wr,ND�0R,WA) � I aA - I a � �: � i -90 11'1�' I I oil 0109 , 11 � , " A, I _151 Rl I It k6l 1 1 0 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 98104 206.68Z3460 FAX 343.9388 CENTER ARTS -N4�� - 1.5-ds I DTM 12/01/j�215 1 0 0 04 0 Z V) co 0) m w -0 < 3:: V) 0 >- �! Llj -,i Z m =) I- < ui = ch (1) L) I.. cl Z -q- It a: < _j lq- I n " ad N re) C�d (j) 1- (0% 0 m m Ld Lj I- w 04 %-,., Ld z < Ld 0 w -0 Z Lj > LL, < 3� _j 5; w 0 z 00 E M 0) C) m 0 04 PERMIT REVISIOlLmls 4 APRIL 2005 1 J U LY 2005 R rLER S U "' B �) JUL 20 2005 BUILDING DEPARTMENT clTY'OF EDrooNDS REVISIONS NO DAIE BY DESaWMN 1 W13-M WG/MC PER CM lSr �M . 2 07--01--05 WG,VC PER CRY 2nd M" A 7/1/05 WPG/BDC PERMIT REVISIONS 111121.� NOTES DESIGNED JjW` I DRAWN KLT CHECKED BDC DATE 10/10/03 CADD FILE XE-COV.DWG , JOB NUMBER 2003019 Cill /--- CHAIN LW GATE d LlOdARCHITECTc., 10 I irco Ci r-O" CONC CUR3 ALIGN ------------- ------------------------- --------------- ---------- L5" CONC SLAB _7 -------- I ------------- PT WOOD 6/ 420) EINCLOSURE FENCE CFNN LTUNK GATE DUMPSTER ENCLOSUFE PLAN SC&E: 1/4- - r-0- phi -site' F EO. 4'-0- 2-7f SOLLARD-TYP, SEE II/A4240 R- 3, 0" TRM90RUER 0.4 cM pq 0 "k OPENING TO VAULT BELOW --ACCESS DOO FOR VAXT 1K 4"8" TRANSFORMER PAD PLAN SCALE- 1/4' - T-0" FINISH GRAD C.I.P. CONC WALL _..�LOPE '/4" W/l/2" R. ROUNDED EDGES Q TOP EDGE Zd Y4" DEEP REVEAL -SLOPE LOWER SURFACE TO DRAIN ��T.O.WALL FOLLOWS 4 SLOPE OF CONC WALK LIGHT FIXTURE PER ELECTRIC& CONC WALK DRAINAGE FILL CONT GUTTER *5 CONT. HORIZ. '/4" JOINT FILLER *4- 0 9" O-C. CONC FOOTING ON LINDISTURIBED SOIL OR 24" STRUCT FILL .%-ATWAIJ- %.CTION SCALE. r - r-0- SITE PLAN SCALE: ?"=l'-O" GRAPHIC SCALE 20 0 so 20 40 6 20 THIS SITE PLAN WAS PREPARED BY LMN ARCHITECTS, INC. THIS SITE PLAN IS FOR REFERENCE ONLY AND IS NOT TO BE USED FOR CONSTRUCTION. THE CONTRACTOR SHALL USE THE SITE PLAN IN THE ARCHITECTURAL CONSTRUCTION SET OF DRAWINGS FOR CONSTRUCTION. BRH ASSUMES NO LIABILITY FOR ANY INACCURATE OR INCOMPLETE INFORMATION ON THIS PLAN. kli,) 14vir-U) w can 2 Working Days Before You Dig 1 — 8 0 0 — 4 2 4 — 5 5 5; 51 Utflfties Underground Location Center (ID,MT,ND,OR,WA) 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 98104 206.682.3460 FAX 343.9388 E D M 0 N D S CENTER FOR THE ARTS 0117' I EXPRES 12/1 (3 C4 0 z OD 0) z mr LLJ F z r Ad 0 LLJ LLI L.Li z < Ld 0 di: 5 Z LLI > LLI 0 Z: CY) m 0 04 Fm 1� 77, 11311 CA 777 S A_ , BID SET 18 JULY 2005 2W5 ig, j)EPARWEWT L cjg F EDMOND- REVISIONS ND DAIE BY A14/4/05 M 4/4/05 ,1 7/1/05 WPG/BDC A 8/26/05 WPG/BDC Tm DESOWM REVISIONS PERMIT REVISIONS PERMIT REVISIONS PERMIT REVISIONS SITE DIMENSION PLAN DESIGNED Jjw DRAYM KLT CHECM BDC DATE 10/10/03 CADD FILE XE-COV.DWG JOB NUMBER 2003019 UAIdd\20O3019\dwg\xe-cov.dwg, SIT-Cl.2, 08/26/2005 02:42:34 PM C12 U CONCRETE CURB NO GUTnER OR 16' VERTICAL CURB (TO MATCH EXISTING CURBING> SHALL EXTEND VARIES PER T13 END OF RADIUS. To F OF EXTRUDED 94ALL START EXTR CURB 10 CODE AT E OF AT'END 13F RADIUS' ADIUS VARES RADIUS VARIES TRANSITION SLOPE SHALL ANSITION W: 7C - 1.12 MP BE 1#12 CTYP) BE RA)j C URB RAMP TYPE I CURB RAMP ING ZRA MI ING RAMP MIN. T > -'5' L13NG RAMP MIK ETAIL E-21M E (SEE DETAIL E-2A4) PLACE 1' WIDE TACTILE f-1 I' BEHIND START 13F RAMP CONCRETE CURB AND GUTTER PLACE FILL DEPTH EXPANSION JOINT BETWEEN C/G AND HIGH TRAMC LOAD GUTTER, IF WING AND C/o ARE N13T POURED AS ONE UNIT CURB/GUTTER AND WING F13R HIGH TRAFFIC LOAD GUTTER MAY BE POURED AS ONE UNIT. FILL DEPTH EXPANSION JOINTS SHALL BE PLACED IF WIDTH OF OPENING EXCEEDS 15'. Z PL E IBF ACP 24' SECTION A C13NCRETE SHALL BE CLASS 3- 300OPSI CURB AND GUTTER SHALL BE POURED 1_001 SEPARATELY FROM THE SIDEWALK. ASPHALT SURFACE CITY INSPECTILIN REQUIRED ON FORK WORK PRIOR TV POUR. F. 5"': REVISIONS API MY DAM STANDARD DETAIL IL GEOM 10/&'1w HIGH TRAFFIC LOAD DRIVEWAY ACCESS (NTH APHALT DRIVEWAY APPROACH) DATE 7/24/M SrAx NTS HIL E2.27 'Z' .' , ko" HIGH TRAFFIC LOAD DRIVEWAY ACCESS METECTASLE VAI FATrEII SEE PAW 3XrM 31 DVrA MZ cm Mw zT Ulm AT U2 .111M 60 MITE, 1. AT L13CATIONS WHERE NEW RAMPS ABUT EXISTING CURB, NEW RAMPS M MATCH ADJACENT SURFACES. ZALL CONCRETE SURFACES SHALL HAVE A BRI30M FINISH. GUTTERS, PLANTER STRIPS, AND SIDEWALKS, CONSTRUCT 3,CONCRETE S14ALL BE SPRAYED WITH A CLEAR CURING COMPOUND 13R SHALL BE COVERED AND KEPT M13IST F13R 72 HOURS. 4. DETECTABLE WARNING PATTERNS (TRUNCATED DOMES) TO BE USED AT INTERSECTIONS ONLY. TRACTION GRID (DIAMONDS) M BE USED ELSEWHERE. CITY INSPECTION REQUIRED ON FORM V17RK PR[DR TO POUR ACCESSIBLE RAW SHALL BE P17URED SEPARATELY FROM CURB AND GUTTER. o T*:--.._E--DV. KD -C--4-T-Y-. F REMSIONS APPIEVEI) Iff ]WITE STANDARD DETAIL D. GEBERT 10I CURB RAMP TYPE 1 (FOR 7'SIDEWALKS) D. GMR1 03/24/05 189 DATE 7/24/01 NTS E2.14 0-199 25" LOCKING LID WITH THE WORD "SEWER" ON IT (EAST JORDAN IRON WORKS CO.) 4" OR 6" CONIC. RISERS (MODEL 00370084) (4" MIN.- MAX. HGT­ 18") GROUT AND PROVIDE SMOOTH F1NISH INSIDE AND OUT POLYPROPYLENE SAFETY STEP 4 A ECCENTRIC PRECAST CONE 12 O.C. C") . a. �7_ Nt a �2 FLOW 4. ..,,,,PRECAST SECTIONS 4" MIN. THICKNESS MANHOLE SAND COLLAR 48" or 54' FRAME AND STEPS COVER N 0 T E: 1. LOCATE MH LID OUTSIDE THE WHEEL PATH OF THE TRAVEL LANE. 2. BASE REINFORCING SHALL REBAR BE #4 AT 12- O.C. BOTH WAYS. .4 00 CONSTRUCT 3. LARGER MH TO BE CHANNEL SHELF REVIEWED ON A CASE BY ',d BY CASE BASIS USING APWA STANDARDS. 'A: 4. JOINTS SHALL BE RUBBER GASKETED ONLY. MH PER W.S.D.O.T. APWA r A- � STANDARD PLAN B-23a. REBAR MIN 2" CLEARANCE/ 6 MINT M.: * " � REVISIONS STANDARD DETAIL APP1W4VD yf rAE GEWIT TYPE I MH (SANITARY) 1890-199 a DAIE 7/24/01 sclu NTS hrm"M E6.1 L rE6.1 TYPE 1 SANITARY MH 40' MAX. TRENCH PATCH PAY WIDTH TRENCH EDGES MUST BE SAW CUT AND TACKED PRIOR TO FINAL TRENCH PATCH CL 'B' ASPHALT TRENCH PATCH 2' MIN. DEPTH- OLLECTOR STREETS 3' MIN. DEPTH- AIN ARTERIALS) (Cm >_ L) z LLJ LLJ ZD LLJ - =5 LLI SEE CITY OF EDMONDS MODIFICATIONS TO DIVISION 9 14J b 2: 'OF WSDOT STANDARD > 0 SPECIFICATIONS FOR ROAD, U La u') BRIDGE AND MUNICIPAL I-_ ON L) CONSTRUCTION. Li 0 SEE SPECIFICATIONS FOR M DOMESTIC SERVICE AND Li A.R.V. CONNECTION u DETAILS < 45 a_ 0 L) 1/4 PIPE O.D. MIN. 4' MIN. PIPE BASE ALL BE REQUIRED ONLY AS DIRECTED BY THE ENGINEER. REFE I TO SEC 7.10 OF WSDOT STANDARD CLASS 52 DUCTILE IRON PIPE SPECIFICATIONS FOR ROAD, BRIDGE & MUNICIPAL CONSTRUCTION. UNLESS SPECIFIED 13THER WIS E .T:v F C. R SIONS STANDARD DETAIL API Mr WE - D. GEBERT 10/6/03 TYPICAL WATER LINE TRENCH SECTION M'M 5= W. 7/?4/M E4.5 rV?ICAL WATER LINE TRENCH SEC11ON rE4.5 9Xdwg\xe-cov.dwg, 04/13/2005 02:12:40 PM CURB RAMP TYPE I 7> lGrAk, �9,15 RESIDENCE (L 0 z CLEANOUT WITH 45* a- Z -7 M ND CAP En NOT TO EXCEED 100' BETWEEN CLEAN OUTS POUR. CrTY INSPECTMN REQUIRED ON FZIRM VORK PRMR TV ACCESSIBLE RAMP $HALL BE PVUREV SEPARATELY FRaq CLRB AND GUTTER. / 7 0/,\ I DETAIL A SECTION A-1 BETWTABLE WAMM PATTERN AREA SHALL ME YELLIN. A PAW -7 --r-2--7 A 0 JAI.�JZ�j PI AN "D7t� I M7- ELEVATEN SECTION B-1 DETAIL B N 0 T Et 1. RAMP TEXTURING IS TO BE DONE WITH AN EXPANDING METAL GRATE PLACED AND REMOVED FROM WET CONCRETE TO LEAVE A DIAMOND PATTERN AS SHOWN. THE LONG AXIS OF THE'DIAMOND PATTERN SHALL BE PERPENDICULAR TO THE CURB. GROOVES SHALL 33E 1/8 DEEP AND 1/4' WIDE. 2. ALL CONCRETE SURFACES SHALL HAVE A BRO13M FINISH. 3. DETECTABLE WARNING PATTERNS MAY BE CREATED BY ANY METHOD THAT VILL ACHIEVE THE TRUNCATED DOME DIMENSIONS AND SPACING SHOWN. 4. DETECTABLE WARNING PATTERNS (TRUNCATED DOMES) TO BE USED AT INTERSECTIONS ONLY. TRACTION GRID (DIAMONDS) TO BE USED ELSEWHERE. 0, F.: ..'"E. D M* -0 S­ '* REVISIONS APPRI By IMTE STANDARD DETAIL D. GEBERT 10/6/03 D. GEBERT 03/24/05 RAMP DETAIL FOR TYPE 3,4, AND 6 RAMPS 1890-1990 DATE 7/24/01 SCALE NTS DWG NO. E2.23 RAMP DETAIL CLEANDUT (WYE WITH C-6EIVER) AND LOCKING LAMPHOLE 121+/- EL 0 U?,PKING LAMPHOLE COVER z /2 MIN. M _j EM WATER TIGHT CAP fffffflMEMw= 12" PVC-' SLEEVE 6" RISER 4' 6' SIDE SEWER 6' WYE AND 45' GENERAL CLFANOUT DL7AIL AND 1/8 BENI) 6" CITY STUB 4' OR 61 SIDE SEWER 12' CLEAN OUT DETAIL AT PROPERTY LINE ASPHALT SURFACE '1 12" LOCKING LAMPHOLE COVER (EAST JORDAN IRON WORKS CO.) MODEL #: 00366108) PVC SLEEVE N%lv2c- CAP 6- RISER NOTE: SIDE SEWER JOINTS SHALL BE _tOUT UNDER ASPHALT GASKETED 7YP/CAL CL N OR CONCRETE M J.. F.;: N M, S. -0-1,TY, REVISIONS STANDARD DETAIL API MY VATZ 1). GEBERT 6/16/03 SEWER CLEANOUT DETAILS 31 GEBERT 01/06/05 1890-1990 DATE M NTS bmw MM E6.2 7/24/ rE6.2 SEVER CLEMOUT 4�r N-W-4-w- "M MW �Z4,0991-00MM 00 WO # * W k AW # A *ww xw R, W" NO, 11 4IF 11 111 1. 0, "NI , W_ , V 1 11 4--g"n-_N W, A A W.W. 1w. N 0 T E: REFER TO CITY OF EDMONDS MODIFICATIONS TO DIVISION 9 OF WSDOT SPECIFICATIONS FOR ROAD, BRIDGE & MUNICIPAL CONSTRUCTION FTZLE 1 MAX. TRENCH PATCH PAY WIDTH TRENCH DEPTH PAY WIDTH 4- 10' 60" - 10'-20' 72 F. _N STANDARD DETAIL uf v= 1890-1990 D. GEBERT 10/6/03 TYPICAL TRENCH SECTION DWIT 7/24/01 SCALE NTS =4.2 (E 4�2 TYPICAL TRENCH DETAIL FILTER FABRIC SECURED TO 21 X 2' 14 GA. WIRE FABRIC EQUAL 2' X 2' WOOD OR EQUIVALENT Cu 8'- 12' ova CITY INSPECTION REQUZRED LIN FORM V17RK PRIOR TO POUR ACCESSIBLE RAW SHALL BE POURED SEPARATELY FROM CURB AND GUTTER NOW y NOTEs 1. AT L13CATMNS WHERE NEW RAMPS ABUT EXISTING CURB, GUTTERS, PLANTER STRIPS, AND SIDEWALKS, CONSTRUCT NEW RAMPS TO MATCH ADJACENT SURFACES. 2. ALL CONCRETE SURFACES SHALL ININE aw crip.) HAVE A BRI30M FINISH. 3. C13NCRETE SHALL BE SPRAYED WITH A CLEAR CURING COMPOUND OR SHALL BE COVERED ANDKEPT MMST FOR 72 HOURS. 4. DETECTABLE WARNING PATTERNS (TRUNCATED DOMES) TO BE USED AT INTERSECTIONS ONLY. TRACTION GRID %AT COIAMONDS) TO BE USED ELSEWHERE. zw aff As 1IM&AZ I IF(pr"10 an Mu kFii_� em 3Aw MIT At mum r TA=E WMM StEr crvp.) '-F /* 5- b. t�A Qr.-..- .1"D N REVISIONS MY MAI STANDARD DETAIL 10/6/03 D. GEMEWr 03/24/03 CURB RAMP TYPE 4 1890-1991D DIM 7/24/M NTS kwa No. E2.17 L E 2.17/ CURB RAMP TYPE 4 u 8# FILTER FABRIC MATERIAL IN PLACE 3/4'-1.5' WASHED GRAVEL IN UNTINOUS ROLLS. USE STAPLES EIR WIRE RINGS TO ATTACH THE TRENCH AND ON BOTH SIDES OF FILTER FABRIC FENCE ON THE SURFACE. FABRIC TO WIRE. CD MESH SUPPORT FENCE 11 Cu UPP13RT FILTER FAIIFIC. ZE) �_'P r�'Y 130TT13M 13F FILTER rl 12' MATERIAL 8' TO 61 MAX. _j a X 2' WOOD POSTS OR EQUIVALENT CONTRACTOR/DEVELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. --Y -0- F C -T- -D N ."D - S "' : REV] IONS I STANDARD DETAIL 31Y DATE FILTER FABRIC FENCE FILTRATION SYSTEMS 1890-1990 DATE 7/24/01 NTS M E1.1 rE 1 . 1� FILTER FABRIC FENCE Vertical Installation SEMI FA VA 00 IN PAI NJ HIM I ... = III, pe 11� ilpTII 14. �M -A . ..... ft" xII ­ZZ11d: -- ISM, ol IVA Kelm INIZI � 111 11:17731re =W F''I'"T!"11 !"INTM ii wl - REFER TO LANDSCAPE PLANS CITY INSPECTMV REQUIRED IN FORM VORK PRIOR TO POUR, 34 ACCESSIBLE RAMP SHALL BE POURED SEPARATELY FR12H CURB APM GUTTER. DETAIL A x 1.90M US RI am ! WAM, I -MCA w= A..= MIImum F-F-- A-IV SECTION A-1 w 1 .1 L AT UrAT=a WHEIIE NEW RAI MIT E=TM CUD IRITTM, PLAIIM Z=n, NQ %wI rxnwm =EWAIM COaTM= NEW RKW3 'M MATCH ADJACENT SLWA= 2. ALL CONCII UWA= SHAU HAVE A NaM FDM & C=WIT $HALL X S11I VnN A MEAR C1.01413 CONPI Wit SNALL. 3E COVERM NO WT MW FIR 72 HUM 4 VMM PI CMINICAM NINEW 'M X USED AT STIMET CROSMININ MLY. MVZnM GM CMAMCN= *M Z USED ELSEWHEM I-koffhaid III S ZETMAIILE VAMW PII VAY X CWATO BY MY NETIM TIHAT WILL ACHIEVE THE MWATO nAM ZDI AIM SPI 904K & RW =nRM 70 K nW WrTH AN EVAIII WTAIL GIIATE KA= AM WMCVM rFM mm� VEr COCRETEll! LEAVE A MMM PATTON AS SWWX THE LI3W A= OF ME T4 ZAMW PI DOLL X PEVJWG=LM TO '11NE CUM 611017M Z#LL K VW DUP DETAIL B NG L/41 WnC r M=7� ZFff 'w r MIIM SECT113N B-1 --'C4-T-Y'.':-0-F'-. -.-E-D N M .0 REMSIONS STANDARD DETAIL R M3EU W/&M D. GERERT 03/24/05 CURB RAMP TYPE 6 1890-19910 VIIII 7/24/M SrALE NTS r" 00. E2.20 =906-=4 CURB RAMP TYPE 6 PLACE FILTER FABRIC BETWEEN FRAME AND GRATE. PLACE: '7,10' WASWED CRAVEL TO FILTER WATER. 3-4 INCHES HIGH AROUND CATCH BASIN STRAW BALES MAY BE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL E1.1.1) UPON APPROVAL OF CITY ENGINEER OR HIS REPRESENTATIVE. THIS APPLICATION SHALL BE MAINTAINED AT ALL TIMES DURING CONTRUCTION PERIOD, ICITY INSPECTION REQUIRED ON ALL EROSION CONTROL MEASURES BEFORE WORK CAN BEGIN. M1.01. N -TY F-.*.' -3 . �J. C REVISIONS STANDARD DETAIL 3). GEBERT 10I TEMPORARY SEDIMENT TRAP FOR CATCH BASINS 1890-1990 VA7E 7/24/01 SCALE NTS No- E1.3 .3 TEMPORARY SEDIMENT TRAP FOR CATCH BASINS GROUND/RIIADWAY NMD SERVICE TAP M 21ALL EE ANGLD AND N9T EIMM 22 IBM 1) 21 CIP THREAD DERJBLE STRAP SADDLE EQUAL T13 R13MAC k,..A STYLE 202 IS REQUIRED REGARDLESS 13F PIPE MATERIAL (D 2) 2a BRASS CORP CC X MIPT, 3) 2- Z' BRASS ELLS FOR SWING JOINT Cl 13R DIP. 4) IPS P13LY HI-MO1_ PIPE C160 PSD DRISSCO PIPE. CONNECTION TO MAIN SHALL BE 1-1/2' COWS AND SADDLE WITH FIORD FEMALE IRON PIPE SIM PACK JOINT FITTING. 5) 12 GAUGE SCILID CORE WIRE (TRACE WIRD. STRIP PLASTIC AND WRAP AROUND BRASS AT BOTH EM. 6) 2' STAINLESS STEEL STIFFENER AND 2' KEPT X IPS PAC JOINT 7) B&L VALVE (IRON PIPE SIZE) CURB STOP. 8) BACK SIDE IF METER BOX S14ALL BE SET AT THE PROPERTY LIW_ I NOTEo (METER BOXES SHALL NOT BE PLACED IN DRIVEWAY AREAS). 9) 2' BRASS 9V BEND 10) WATER METER- TO BE SUPPLIED BY THE CITY .11) 2' METER SETTER WITH HIGH BYPASS EQUAL TO F13RD DRAWING #A-95147-M VERT. IN, VERT, MT. FLANGED BALL VALVE WITH LOCK WINGS. 12) STACK 2 PETER BOXE& MID STATE PLASTIC PETER BOXES 04S 17 X 30 X M, WITH PIS 17 X 12 DUCTILE LID WITH READER. PLACE BACK [IF BOX AT PROPERTY LINE. 13) BRASS NIPPLE 14> 2w THREADED BRASS NIPPLE U21 LON(D 15) SCHEDULE 40 2' PVC CAP. REMOVED WHEN C13NNECTIKIN MADE TO CUSTOMER LM 16) 4' X 41 X 81 CONCRETE BLOCK SUPPORTS. 17) Z' RESUMU WEDGE GATE VALVE (FI.P. X F.I.P.). ULFM APPROVED, AIITfft ALL FITIM M4LL BE V= FUSE BONDED EPDXY COATED BODY AND BONNET, WEDGE FULLY -112' PEM, ALL PARTS IF USM I ENCAPSULATED WITH RUBBER No WITH 21 AWWA OPERATING %4LL BE I-Vr OWT 77E 2' WEDGE NUT. EQUAL TO CL13W F-610& 11 VALVE VIM ATASS 209M 18) 2-FIECE VALVE BOX. T13P SECTION TO BE RICH 940 STYLE 18' WITH REGULAR BASE SECTION. LENGTH TO M. - - E- T * F . Y C7.1-7. bM'C .1"D _REV.ISIONS STANDARD DETAIL WIRIIIII'VEN By MATIE M GEBERT 6/16/03 1-1/2"- 2" WATER SERVICE INSTALLATION 18 0Z i 9CjID 3). GEBERT 10/6/03 VAN 7/24/M E7.6.1 �If NITS MEMSE�� 6. �6. I 1120-r DOMESTIC & IRRIGATION WATER SERMCE 10, R �1 R x PLACE SCORE MARKS EVERY 10' 1' MAX. 4 A. DRIVEWAY WING OR CURB RAMP SLOPE CONCRETE CURB SHALL BE NO LESS THAN 3' IN HEIGHT CONSTRUCT OUT OF ACP PAVEMENT L) C I, --a ------ EXTEND PAVEMENT L3' MON ME FACE CURB IF NECESSARY TO SUPP13RT ACP PAVEMENT EXTRUDED CURB 5/8' CSTC: BELOW ACP EXTENSION E 3 0 C, REMSIONS APPIUM w I MATE STANDARD DETAIL IL GUM W/6/03 U GEBERT 12/31/04 CONC. E)ff RUDED CURB - DAM 7/24/M 3CALE NTS E2.7 fill, 1 3A I CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR EXPANSION JOINT DUMMY JOINT 1 4r ;. . '' _'. Ad JA .:A4 A 4* : A % A A "A. 4 10, O.C. 5' O.0 5' TO 7' 2% f-A A,*,, .4 A. :ve ... ; . -, UNDISTURBED EARTH OR COMPACTED NATIVE MATERIAL FULL DEPTH 1/2' EXPANSION UNLESS OTHERWISE SPECIFIED JOINT MATERIAL BY ENGINEER SECTION N 0 T E, - 300OPSI 1. CONCRETE SHALL BE CLASS 3 2. CONCRETE SHALL BE BROOM FINISHED 3. SIDEWALK THICKNESS SHALL BE 5-1/2'. 4. SIDEWALK THICKNESS AT DRIVEWAYS SHALL BE 6' THICK. 5. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK 6. CONCRETE SHALL BE SPRAYED WITH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS. N 'I REVISIONS STANDARD DETAIL API TY CONCRETE SIDEWALK DAYE 7/24/01 SCALE NTS NM E2.13 CONCRETE SIDEWALK CONTRACTOR NOTE: DO NOT KNOCK OUT DRAIN IN BOTTOM OF VAULT. PER SCOTT HIGHLAND EDMONDS PUBLIC WORKS WATER DEPARTMENT. H.Laa 'Nin L %1""! P, Rill; �4 0 ? x z 0 z 2 04 SIX b C14 z 0 102 9z :E z w w 0 2! a 0 89 9 -OF- ICx' �Z=r M* q z _j ului 4 !tf 0 IL Lu -.4 z z Ca Ld In 0 tt ;a rL 0 z S2 .12 Z Ix Ld 9go 1 !6 12 I Y C' REVISIONS STANDARD DETAIL APPI vt DGE D. 6/16/03 DOUBLE CHECK DETECTOR ASSEMBLY (DCDA) PROFILE I 90-1991D D. GEBERT 10/6/03. VAN 7/24/01 SCALE L ULTI-FAMILY) Hm E7.8.1 NTS r_ COMMER CHECK Y&VE ASSEMBLY CIAL DOUBLE APPROVEDrum C:� r-%1-20TI N C TRU F_n I eer Date 71111l� illii;��Ipii 1111 IN Oil 1110 I' 801 SECOND AWNUE SUITE 501 SEATTLE WASIiINGTON 98104 206.68ZXO FAX 343.9388 EDMONDS CENTER FOR THE ARTS '4� �AL"-' 4 . 1�,&, - 4!7 I EXPIRES 12/01/4gf N 0 a5 z U) 0) 0 < (n Li z < Ld ch V) Z ed' Cf) w 11-N (D 0 in W LLJ N Ld z < Ld C) 0� Z uj > Lj < MMr !> 0 z V) D 0) 0 Im 0 04 PERMIT REVISION� 4 APRIL 2005 RNSIONS NO DAIE BY DESaWIN 1 04-13--05 WG/'BDC PER CM IST REVIEW TITLE CITY STANDARD DETAILS DESIGNED JjW DRAYM KLT CHECKED BDC DATE 10/10/03 XE-COV.DWG JW NUMBER 2003019 C1,3 A Xdwg\xe-DEMO.dwg, 04/13/2005 02:14:30 PM i., . I . , FA No R, Igo op 3 SDMH RIM 68.54 IE 65.9(12"CP E) IE 66.0(12"CP S) E 66.3(8"CP IE&T&TV W) 0 /H — — — — — — — — — — — — — — — — — — — — — — SSMH RIM 68.76 IE 60.3(8"CP E) IE 59.4(8"CP N&S, CTR CHAN) CB R I M 69.98 11 69.1 E 8"CP E) DEAD END" Z(ZXAU RIM 70.40 �j �V� IE 65.6(8"CP SE) 30-.- 7 . .. it 153.1(8"CP N&S, CTR CHAN) D D PARCEL B U-Q, —lu i4r'BENCHMARK "C" \TION 72.47' TOP" —OZEI C 'CB RIM 70.81 m iE 69.6(6"CP W) 0 BOTTOM 0 67.9 R U) GLLN- SDMH RIM 70.72 IE 66.7(12"CP N) IE 66.7(12"CMP E) IE 66.8(8"CP S) BOTTOM @ 65.5 GRAPHIC Sill".ALE WNW M- m ON m MINE �� roll (IN I=) 1 inch = 20 & CONTRACTOR NOTE ALL EXISTING UTILITIES SERVICES TO BE VERIFIED HORIZONTALLY AND VERTICALLY PRIOR TO CONSTRUCTION. CONTACT ENGINEER IF UNKNOWN U11LIlIES ARE FOUND THAT DO NOT SHOW ON THE PLANS. DEMOLIT10N NOTE: REMOVE CATCH BASIN SAW CUT EXISTING CONCRETE REMOVE CAP EXISTING WATER F/7 LIMITS OF DEMOLITION FOUNDATION AND MAIN FLOOR TO REMAIN THIS AREA m, 801 SECOND AVENUE SUITE 501 SEATTIf WASHINGTON 98104 206.68Z3460 FAX 343-93138 EDMONDS CENTER FOR THE ARTS G. DORES 12/01/-OA I C*4 0 00 0 w C.D ')I- 5 - LLJ -i F- z LQ FV) C.) Z -.0- C4 cn o:: 0 LLI LLJ V) C,4 W z Lj 0 o 0 Z Lj > LLJ < ly- 0 z 0 D 0 m 0 C14 z RESUB APR 2 12005 BUILDING DEPARTMENT CITY OF EDMOND.S REVISIONS NO WE BY DESaWM 1 04-13-0 WG/IIDC PER WY MW WYEW 'nu DEMOLITION PLAN DESIGNED Jjw DRAWN KLT CHECKED BDC DATE 10/10/03 CADD FILE U: \LDD\2003019\DWG\XE—GRD.dwg JOB NUMBER 2003019 C1,4 � . � . � . . . -�. . 1. . I . . . . .., . - 11 . . I- � I I , . . � . . I . i � . . . . _��' . 1� v / . "*\\�IE 41.77 (6" TRAP N I WATER LEVEL) ,ap,." - ;­ ��j::il / I , ...:', f E 42.6 (6"C SE) , , ��_.11 -.1 �. SDMH ',",. I / / .1 ­.. RIM 47.64 �,_** - �, I / INLET .." -_ I , IE 42.0 (15"C NE & SW) 1-� 1i "� 17 , RIM 46.63 .. ­ --- � ., ­­ - � ,;::. , / �-" -,, ,_� IE 43.1 (10"C SE) �;;. � " -i" -- IE 45.5 (6"C NW) :., . - 1 - .." I / , / ::�� .-,, .1 / I / I., �jj, , UP ., -­ ; .1 . . . / ��c, �, :-\�1. , :.i. / �_,,,.,.. . , %,. . � I-- I �.! -_ .a. CB I . . ��..:,:;;�:: H / / � ; , ------- RIM 47.00 .. .�­� 024�t w/ / r- . I . ". ,:i � , 1� I ; i . - ': �11 . � -_ �:s I �, EB IE 44.9 (10"C NW) . ­�.:. \ 4 / , I....s, - � - � �� -1 , \ , IQ0 / ,/ / .�­ - 1�. , * ­1 .v� / \ ,�',. ."', !��,\v EV I ... ... -1-1 ., - 11 - ]�_ � .1. . - ( q§ 0 / / :�. � . ­ , �,', . m. .,.� 1b - I .1 * - // / ... �. t� :..,..,. / / �,.�. tx_ ­', / � -,: 1. , - .. I / C,� ",:-w ) , �, , ­ ::!�, , .. .1 _.. // .­ Aj lt� . �_, / / . �....� i _ N , , I A., �;,_ I 't+' ,- 1w. 'o :`� q 7:r, 2 - , . . . . ,:i . �Ji� F / / :_� 3 ":�� . - . � -`_� : - . � �. , , � �. I � � � 1 ? � . . �,:�.. / /� "2) / E1.3 ­1 - � :i..`;; I �\ :,::�+ � / ".:"': _/ W// ,/\ 1. %,::�`,� I STOP ,. . ,: --;- .__�,\ / / !:�� . ; i Z)11.71\1 ­ I .. 1. �i . . . �... , . ;.`-.1 // * . - �­ . .,. .qi /\ j . -.)" ­­ Z:�',-w b . . . !.'. ) _p . / 11 ,� . . �. 1� I.., .:�.�� / :­ , , I ,, � ": I . , i ­�,_�' 4z� / 17k Iz-A � �1"+� " - "-. ," \ �", . . ..:ill'. , i I."... 1. 40 "� .,�'.. _? / / / - , " I . / I r - .� "�� , 3-\ � , :. It., . - -1 / ,�\ \ tk,_".:�' �,,, __ / J \�� 1 ...,.'r�., / / / / \ �.',..',. :, - : � .e.m. ,1 I \ ".. ..i: " It ;�� .:!.", - .. lil` / / / \ \ .'.�.: .. . 11 I 11,1 11 \ 1:�� +v / , -',,:*: 1�1 � 7� : / ,,-- I \ \ ",*,..�; . ,.V..-�-:+�: ./ I / / h 1 -STORY HOUSE _1 � - I .I... . \ i�:i*.�,� I 'p. I . / / _,. .1 ... �,-_ / 0", E1.3 \ - I FENCE 2.5' , .:�. , I � I.- i / . / ,.,. \1',_ ­.. . / // I., - 1.0 I SOUTH OF LINE / , +_ , , .: / / / 'k- . ��b I / / // / /// I j I 01 . 'V�' I -_ tA / * - ) I . I I / ­,', -GONI(7- ... 1, 11 . CB . , " , 1� �, � , , % I I / I O/ E_---- PAD / I ,. . , '__1 RIM 47.33 0 I 'ip' -12 - 41-R / . .",��.:+, - I.-, �T�(N ," - " I . / . ., ­­ ,\ - , 2.5' BRIC )z it. 45.2 (10"C NW2 . jP . "", i �1 � .. , I.-*,., ;zt - 0. :1, � , ; ":�j_ �'. B . ,_ :�!:�*; IS2� 1 �- N - - - - ... --- . ­ �._... :.,.: - 1. f It * ­.. . � 1b :�,:_ I 4 - - c6l BENCH K A" ' _/ ....�. - - 6 RI , ,*,r 11�1 , 11 w i '��, .1 , 0 ,e n I , I .- ., r_Lr_Vt1%11 5 .20 1..�_ I N, - -0- /0 : � i6 1. ... ­� I . I " 1, .,:: 11 ­_. .'--'!--\ -U / - . 1, _;*' �A_ ,Cq�Fo � 1 W_ .0 - " . . , I , v . >1 :.� .) f / / " . 4: . " �p. ' /0 �e 1, . I I Ir :�.. C R 0 S S �- W 'AL �\': �,, �,,,': ' ' - .�� /7. I I 11 � + �6 / : t.. - + - / / ­. �.,_�;,. " .,Zj /....y___ kl_,� . I - -----�� - 4 __4 / X, / �..­: I, " - - '/ ..", 1� ��. N 11��:: ;­ �r�-. I , - -t - '/'/' � .1..i. c .��,�-'� 4 1� / 4TH Ak\fp' � / "'' -­4' , / ," ..;;1 I . .. - ..., C', - - ­. - ,p \ .. ;1.1�� 71, . rrl,�\ / I6 " . , ", kL . . � - / / �' EXIE 11W . ;. _. rl I i / /, , I �� I \ I / 11 FIRE HYDRANT .- p . J�� I., / I/ , - / I...., 0.*a . .. - / / I 1_.,q 0,.�k I ,.: j / / _F. 11 I / :.;. I I `.:�;: � / / , , ,. :�*;::!�. I .1 / / I I %0 I - ."':1 .. I / / .1 - ,; t / �__ 2k` _�, :.� -� t d . _� I I / ..­� ., / / 11, .;��-�,i:!� / / :�;:�:+, It / � - I �,;:�:: . i � ,,,, , / 'ic� '! -,,, '.... I - I +1 � � . : . .11 � /I I a . : . .. - / 4 ...'�% � �� - . , 11 . ; I.." " I :, �.., ,+�.*.. . p ... - 1. .. . -V / / �.: 'A :, ::� - I , . � 181 I I ­:: I/ ­­­ ..; / / . - ��­ - ,. ,; I . I I . - , , �i / / CONTRACTOR NOTE:EXISTIN 1:1 ..�L ."b, 1. ..�.'Ili - .�I:�:: 1 .1. , / , _�, �;.�. . . b.. / / OFF STREET PARKING TO BE ; - - ... � 1, I I 6 / / USE FOR TRUCK LOADING v � /� ...... �, : ...�11 , ... , -.1 IGRAS .1 . . . + .. . ,-.:�. ls� �'! - . . � , ; �.... .., - ., , / / DURING BUILDING DEMOLITION. :+":�:.,. _: 'I5,!: I , / . / - 1, I �, I - 4 _�'.. " I I/ , ­ . _�A ---.I--- . , \I-- � �f�l Vil � __ - U , 11 T IA5.�+,��.��` - �� .z -, I Ii. � ., . . INSTAH STRAW WADDI F ON ...... �% .1 ___ - . ." / �, �, A I .�..1/ .; lip ., :,� .. � / � UPHILL SIDE OF SILT FENCE. . %, �' �. � 11 I / I.", V�j %,::: \ - - . � �. . � . . . . � .� ++ CONTRACTOR NOTE: 1� .-��!,�:i ,( ,� �: : � % .r7 / . I " IF / ; 'j- I - ,.. . . ... , FI .. 1�...: Xl\\.-..k 4k, .: - .. I I... e ., AND WADDI F LOCATIONS AS ­ /, . � - ��:e�j " .' *1 I- I / I'll _.. T ESS. THE V%', � "' ��:�, ,_, . *: - ... :� .:.., LOCATION SHOWN FOR THE /_ � .­­ ,- �!!�:11 /. �.,-� x ­: � - / .. . ..... � ;�,:, ­_,�, '. " 00 - ; ..... ..:1. � ,%'b .. _Jl - . DEMOLITION WORK PHASE. .:.,.:., - \ .­ �,VL�:'__ ...: __�, \ I I - /', !. 40. , ­/ .1 . N P,\,A,T K LI . I I I 1, wi \_11, - 11 . ��. '�>_5 1 EROSION CONTROL NOTE: � �.. '0-� I �+ J-�, , THE CONTRACTOR WILL BE USING .. � ..'. 1_� I � TIR .1 I.: V-, % , 1. .. (2) ESPM FIXED AXI F TANK BAKER I-- . � .. I e TANKS (SMOOTH WALL LODI VERSION). \ ��i . / . , DURING BUILDING DEMOLITION AND ,:. ! � SITE GRADING. ALL RUNOFF WILL BE -11 , . , . . . . . . I/ \ .... I I G RELEASED. I.: 11 0 . I 0 ," 'i \ � Vp, 1.5HP SUMP PUMP ."o- '. / - � 'It" ::; . I TO PUMP WATER FROM , - I - I/ � - PLAY -GREtNH �_ U. � �i. OF GRAS,-,- - I ) /' FEN , X. / I / I / / , / 6­\ D � - __ __ � -Nit 11 11 \ J.v ��\ 1M '\ 1, I . ­ __ ,",/ 't�T 0, , / R), �_ - . ,,;�, __", �""� , / / / V, . TAIL H D ///,/' / r____KAIL Iz�p / . / // z// /, I -1 I , / / 7 . LEGEND . I . - N89*48 32"W 168-00) -----fs-- 0 EXISTING CONTOUR 0 1 6 . . EXIST. SPOT GRADE _1-� I [�_ . Y_ 13�: PARCTL C I LIMIT OF CLEARING 07-,1��.� 0WE 09" I-00 I N I FILTER FABRIC FENCE __*_ _*_ . I_ ?:: T_ b 2-STORY & BASEMENT / 1b, ,;, 4 I INLET PROTECTION 0 WOOD BUILDING / 0 I . CD / > I 2. I / - 'a,�, V) � . I / / \ - - - - 0 LH E Z_ 10 / / / / / .. / / / N­�, , : %, , �. I I REMOVE 0 . *-b 4p / / / � - (T / / / .11// IL /, / /, /, /", /// Z / // / / `**­ :,��,, ­.- .. �. I __ ,,., I - I " � ,,'j yp I - SDMH - I-' I - - I. - , , ::,:.sk KI I CW _-_�_.-- > I I ��`^`, . DETAIL REF. # .. a .� ----- - .,:�, RIM 68.54 (2) . , ''I ..... ­­­ - ... ,,__1 ,Xlx�::­T,, " _7�0 4, '' . �'. �.. I _­_�1;1_11 . .. ,_�. :.�,:!;�*�X.,`, - DETAIL REFERENCE I\-- .1'.., I ­.,\:.'L1.:.,. � .... �\ -e , .. �..." �.� �, I � tl� < .1. -F - :.:�.��,:,.:�j. :.,.._.;iv:s: �- -.-'_.�.":, �,.,;:.;.i '.T i . ...-:i .i." ­. `­ �:, `­ ", `1 ­ - I-; - o .. .. .. _­' �� I 11 I IE 65.9(12"CP E) 0- , � 1..1...-,1'1:. ��, .;- ..''... 1.11-.1. ­1 I \ N - .. - I. . ,_ � I 0 1 ��_4 REF. SHEET # , - - I :�, �, � / 0 -1 I I: . . \ \ `� -.1 �� 1,,�i.,;��.� :; � . ��' * �� 4"�7 K, �; Z­ �:`, ii::­ � - , \ :. _1� , , , X . , ;�, - . �p d �_ . � C;�- I -, IJ .r.l. , I / I \ 1�� ,�� \ ,�� \ ,��, \ - _�, - --\ < \ _ IE 66.0(12"CP S) � - . ,� �; --- _._z__ =:;; _95 rA\ " __\ - - . - - - -N�-- - 7 - - 4� \ \ \ = = - ., IE 66.3(8"CP W) LINE _\_ - - - 1-1 (� - Iro � �.- 0 1 67 . 71 0 \ \ \ \ \ \ \ I qr-�,.,;,L., I I .1 , \ \ \�± j I ., -, � .- IE 8'CP E) I- ,M! m ' j$ ZH T I ,,.,;, , O/H E&T&TV - - -_ �8'3 " w Z� \ \ \ \ \ \ \ \ \ 1 4p 11 I -_ �I.I... . I I I- I �� - - - - , I 412 - " - _____ ___ _____ � __ - � - -.,,:,;; -+- SSMH __ 1. i I ��11 � � " � . !�_�," = A/C DRIVE & PARKING I __ I I ,,-�',% I RIM 68.76 1 1. - - - ,____�69)�_ ,w-O! 1�_ 11 I IE 60.3(8"CP E) ffim MEW IM ir / ___ _____ I I Im 11 ,�i.,: a __ M. , I - "CP N&S, CTR CHAN) .;; . I w - v M.�M.�.W,._M,,, � .­;:r6_, , I . 4 1 IE 59.4(8 , .M-, I 1. I :. ,. I ; �� . I 1� - , I �', � � :�:, .: , . � , � , � � , %� , I , , 31 , - . : . - .. I : , il. � :,: . .. %­ .- 7- - 1. . ­ . - -.1 , v .. �, ,, �:,:�, � ` ��: ... .1, . -.1'. -.1-1 . . � .-,-: �,;t, � �:.: I I . ; 11 !. . . , " :� .:. �7 R 9 I �r - ., ":..e- , . 'i� .1 , _. . : � / 11 / I / / / / / / / // / /I ,il I I , ,��j - .�� * � ... - . / �� _ __ .:: ,k ��,. , ­_ .. :1 . - / I I �.� /I / ­­__ .1 ,�,' 1 I GA 1 -- I I / i�--�.,� , , / / / r- I / ff'� - . / � ,/ a ,�:!i' -'S I __ ___ _�-,-,.,,.,_ -- � __ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 4� / / I I I I .�..,, I WASH NOTE: IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIII11111111 " I , ,,-,� - - I -!"., '�� WHEEL :".". / / - // //, �,,;.` 9M / z / I/ / / I / 11 ,­.� I 11 I �,� .,V` .',e�� - . / / ..".." I ; I /'El .2 CONSTRUCT TEMP ROCK ENTRANCE , / / // / / ` , I .',_--.�-, 1Z - - - "...",."., ;,3�!'-� / /,/// / / / / 6�i.-.`. 11 WITH WHEEL WASH S ��*, / / I "'' UMP. SEE DETAIL ­ � . I , !i,,�, v I -�.-,' , / ,1 -i��:-..,., I '�1; I I I !A� / 1_j I !,: / . :-.,�:_-, .. / //.z/. 111. I I .--- / ,/ / . // / / "i.111 . . � -.,*, 11 I I :.�i - * , LOWER RIGHT. , �., �,­, _.." p , ,- /I / �,.� , >_ / 1��",,�� I 1. - __7 / I - - - I I I --�. ., I; a- / / / I - I ,.,I 0 1 / // I // 7 1 ­11 __T - �,l I / / / / I I � .1 / 11, I I I I ... / / / // / // - t. It - CB . �, i c '.�jj: V / I I - - .. I RIM 69.98 1 / / / // li,�,* __,__=�� A-411­A . I I - i" 11 r / r/ / r / / r / v / CANOPY 9 z IT di \ I 1, . � 1� , / c, q. )-: x 1�,' CON 6N"r 1 . ) - i^ ?Lwl�, /��, . 11 A ,-'V I I ,J,:�� �rc I - J_ 1.11 I I— -- I I u A 114 u I METAL ND �A 67.82 . HAND RAIL I - - - - -LW- - - - % �13 P E E APPE W, � I � � '01. DI RI 19 ". I \\ \ i - // 11 I - " _\ "\. 'I-, I "I , . � f / I i Nv ( L >, "I,*- , _� - - I __ - /\ L Lv N hG I - t"RI'MI, _T I \ (1r)M_ I . - . I r- - pAq / - I - - I- _1� - � - - I , D_ I _j/ I \ - SS(REqL I - - _\_ - �_ - - = _j - Ir = - - - -I T I - I / \ "I . \, I 1 \ ) I / I \ I �," : - I I SEDIMENT TO BAKER TANK. -?J- . I .%. I... - ,,, 1� \\ � I... .::., P '. GRASS r '. " tj > .. -.1.. -b� /3r � .. , ,;. IN " I \ _r 11 � \\ \e I � I ", i __ .b' I L 11. : t , u- . - I \\ / I qPT)IKArwT TRAP NTH 2:1 SIDE , _4plll_ / - 0�q -1 . I \ I \ , I I I SLOPE, 4 FEET DEPTH.PUMP RUNO _ . .1 . / I .1.�... I �. 11.� � .1 I Ill 'o I I.. I :�r , . - ��,_ 4'.... �:� 1111� , ..... _. \ - I—- I.. I (n TANK. I '.... �;­... 11. I I—. , �, � ­11 . 0 �'. 1. I . lb ­:., ! 'i i . _.. I 0 - i I "..... , � . I I .. \ -,-, I \\ - \I- / - / I / / / / - I - -j \\ 1. ,/, /n / I K. D I 4tE H - . / ./ / I/ -'// / / // / , /11 E �E�AIL T�IS S - �)i , �_ I / "', // / '/'/ / / ,� CW / " / / I,-- - . \ 11 :::: / " " "_ I I //, I I ,, , � / / / LZ_` / . . I " . � - - I .­'. I/ /I ', , , 7 '��,, . (D 1. ., \ , , / / " ", / I . I / , ., , I 11�1 . .. ,:. / , " / / / " / / . , .1 I .--.--- 1��11 I / " /" " / " ,/ , , I I I/ "I .1 / , " \ . , I / / "I "., "'. ., / I " �:�... / �. � , , I it / / /" / / '.1, "' / // SEDIMENT REMOVAL NOTES , I T:1 :- . ­� N GRA S I / / "I / ./ "I , / / / / Ip _� 15 I ,/ I / " / , / - N . I "', 1. 1-1 I / I , . I . � ... ..\:,�.,i q��:, 1� \ / I / I/ / ..... . I I / /Z .., 1. \ I 1: - - I / / , / AH DISCHARGES MUST MEET WATER QUALITY CRITERIA 1:��., - I 1zP .. 11 / / / / . . ... : I / / --" / /­ / / . / THEIR WATER QUALITY STANDARDS FOR SURFACE WATERS OF THE STATE OF WASHINGTON AND THE PARAMETERS SET FORTH HEREIN. SAMPLING AND TES11NG FOR THE PARAMETERS LISTED BELOW ARE REQUIRED AT A I& MINIMUM. TURBIDITY - DISCHARGE TURBIDITY MAY BE NO GREATER THAN 5 NEPHELOMETRIC TURBIDITY UNITS (NTU) OVER CKGROUND IS LESS THAN 50 NTU- RBIDITY MAY NOT INCREASE BY MORE THAN 10% WHEN THE BACKGROUND TURBIDITY IS ACKGROUND TURBIDITY FOR THIS PROJECT IS 45 NTU. PH - BETWEEN 6.5 AND 8.5 DISCHARGE RATE - NO GREATER THAN 150 GPM D FREQUENCIES ARE AS FOLLOWS: PARAMETER FREQUENC SAMP TYPEZMEMiQI2 DISCHARGE -VOLUM DAILY PUMP ES11MATE OR METER . PH DAILY DISCHARGE POINT AND THEN MEASURE TURBID DAILY GRAB FROM DISCHARGE POINT AND THEN MEASURE .. , ." - . . ".".'. 1. " 1�� :, ; ` I ; ", I � ...­ . �,,,­, �­,,.:.. _�,-� " ;",.. ., " . .1.11.1 .1 - ,� ..." - . � , " _., .� 'I, ., , - ;. :� -VARIES-11 MIN. I 1-l'.... 7 �:.;," f .11 i DIVERSION DITCH DETAIL "..., / ""I / ,// / / // I ..'. .11 " I / / 'i .,*,-.1. (8- 1 � I / // / / / / //, I/ / / . . - / �- .._ / / .11-1 / / / ,/ / - . 11 � / � , , �. . .1 . . .1 I / / / 1/, / , / / / � � %. : I .�. 1�. \ STON STRLICT�RE , \ ,b // ,/ /// / // / / ,/ / / . / / // ,.. - / I I , I \�i. / WITH PLA UE / , '. " . " // / 10 (�,' ­1 I (o / e / / ...- ,." " / "'. I 1.111 � . _­1 I , / 11 / ", /, // -l"', / // .1111--" -� /-', / , � . '. 11 I 1� ,g�-- -, I , , " . :��*114 % . , �. ` . i4 � � 1 11�9 , / ,." .. / I " // "'."', 'I/ // / . �,\, , / " , , , , � ''... � I '. ; ! cv *1 � /I / , // - ,/ / ", , / ,/ 'I, . I . 1� ��:-. . , z I , . . I "' /I I / , / �, , / / I I I j b , � / ,. �. ! -..� �. I I I � ; ,/ /` ", , ,� / , �. - I \ . I : � ,/ , /I "I " / / - , . I �� , 1, , _-, , 11.1 / ,./ / 4, " / .11 /" / * -1 , - � I '--.,- .11 _/ / I/ / .. " I I I \�, ..1. I ,/ / " / / I / // 1/1 // ,/ / �. . 1*_1 .� \\ I / , * // /./ // / 11 � ­ 11 , / . .: r) IN, I',- . : I 1:�%.. , I I I / I , /, / , , I � ... (b . 1 6��' , 11 / / 11 / / / / ... 1, -3 / /I - .11 I x // ,,, ,/ / , ..�F,.. :­ . / / ". / /I , , " I .�:. I .I. III / / / / / � %. . I \ c, \ :.,...,. , . . / ,,, ,/ I / / ,.' / - .. - ­1 . .,�, I .1 , ro _�. / I / I ..., co ..:.. - 11 / - / / , '. - / / /" I '' , I - . , � I , ":. � � . I i�.:%:, w / � / / / I / I % I., I SSMH �,­ I : s . .-- / / / / /I RIM 64.79 IE 53.8(6"CLAY CTR CHAN N-S) IE 59.3(6"CP NW) IE 59.4-(6'jCP E) I � � I I � ) , SDMH RIM 65.96 IE 61.3(10"CP S) IE 61.2(10"CP NW :1 'I _ - __ I , ..1. . ". � . 11 / / / / / 11 .1. " / I . . : :: I :, I . I , C M 4NIT CHRISTIA I / / "I, // // " / e . , � I \ F LLOWSHII I / . / / / " ., I i / / / /" / "I / i : �; I � i . I ! . / " . . . . . , � , I � I _r / /1� �, // I I / ­ I . k / 11 / // // r1171 rA - I- _____� 11, I , " I'll I , " - , ,� __ � 1, � - __ I- - , 11 11 I ­ -1 - - 0 11 , I— I "I "'' Ill' LMNARCHIT - .�, r , , -, 11 , , !� I Ir- 69.K8 Cr E) .., .:, ;..,_:11� : � .."I"I""': 1',`sF11,1�'1.11.1::1 ­­�_ . lz� / / I .1 �. - ­1 - I I < / / I 11 . '*�!�',."', / / I .",:i�!�t"*.� I 1. �, // ,�.Zr 9 _; �i - '/ rSH .� L' I I/ � � I i ,,-�,.'-*,'-",' / // � 01 �/, / : / I -,) / / - ��) it I `_,:"�;-` -1 SSMH QMUSUCTIQU =EN I , .... - // " I I I .-��-,,-----, I M 7. O. 40 ,'' - / A/ �, '. / 11 (Z - �� , / / I I(- I/ A -I/ / - , I 65 6 3"CP SE) . \, / / / / ", --- . /�� .1 ............ N 11 I -P....-�i". I I / / 5.52 / _"N ..r s.i: ; %..:;, I � I CHAN) 1. CAU CITY OF EDMONDS ENGINEERING INSPECTION LINE / FINtSH LOQR- - V� :�,`_' I/ / "///, / / / / . / u,I :, I... - , IE 63 1(8"CP N&S, CTR TION MEETING PRIOR TO ANY CONSTRUCTION. , - I / / . � / / / x / , . �� �L. / v UC / / , , / , ,/ i, :\ �_ ��:!".� INSPECTION "I / I / I I 00 `_; 11 CALL ENGINEERING 0 (425) 771-0220 ext 1326. SCHEDULE ALL . // /// le .1 .1 - �.� I ­,.: _:�,_ 1 PARCEI B . / / / I / , - T I I - --- 24 HOURS IN ADVANCE. / / / / / , r , ;� / / // � .. �_." o , .... . � ­­ . . , :h,! �:- :: 11 ., I I �.::[,�- , 1'�,� I!, __.i:t,_.. P BAKER TANKS PRIOR TO ANY CONSTRUCTION .. __/� I �, / 'I, - , 1 I . . � . �!:t.. 0 1 1 - ...., _. ' ), -Q�.ENCHMARK "C" 2. REVIEW ESC CHECKLIST. SETU / / // , / :�: �. '-, I I / / ,- _1/ . ­ �� . -.1 :* " �, ,. .., ...., . .- ,�.!'.'. .. .1. ��­ . .!- 1",� . *�:,:�,- . .1 .. �, 11 . / � / "' N. .��_,',`_ � .1. � I 1.c1===== I :: /__ ELEVATION 72.47' NATE. " - �` .. �1�­ - - - - - - __ - / F/IRNIS/W / qR \.N I ': :. :::: : f 1. . 1 I..,::` 4: . I I , .1 "wop" S;, _ -_ - / i,i cl.tp I , " __-q- . // .1 - ... ;;Zz �.. I - -;jT T - - - - - . .. . � IV M - � IV ) I N 1, 0 -� n/" Tff�C-I W / x / � ��_, I \ .. ' 3. INSTALL CB PROTECTION PER STANDARD DETAIL E1.3 ON ALL EXISTING ,�p :: �,:, I ; 11 C R O/S' -VA' , tpl-, -----Exis-nNG CATCH BASINS PRIOR ANY CONSTRUCTION. INSTALLSOCK FILTERS IN ALL J/v / / I / k I \ \ \ � I I I t "I . .� 1. 114 . I / / // 4 - - I I I -W+ -7- 0 FIRE HYDRANT EXISTING CATCH BASINS. / / - - 11 RIM 70.81 / / /11� / . 11 El. N, IE 69.6(6"CP W) . 4. INSTALL FILTER FABRIC FENCE AND STRAW WADDIES. / . :1 4 .45, 19/, / it "_'. ,_'. / 11 / 7. : .�, 4 i __ I I I ,___,. 3y, 1 .., I / -_;`..;� / ��/j 5. DISCONNECT ALL BUILDING UTILITIES PRIOR TO 1 / _j `.:11 I / / _j �_11 / / A _:� - GLEN BUILDING DEMOLITION. CAP ANY ABANDONED SEWER / / / / � ,*§k - - �'. '.,, . SDMH SERVICE AT PROPERTY LINE. CUT AND TURN OFF WATER / �g ;,. A/C DRIVE ftia, / 11 11 :, // / ,. :� I <L11 i " / 1 3: ,. el___;�___ - . 1-1 I �, RIM 70.72 AT THE CORP. 0 /0 / 0 , "CP N) / , � '! � , 6' CHA INLINO r- - - IE 66.7(12 / !�. ,�.� I . - .. _04 S F E M04UMENT � / / / / / � ��.,�:,- / FENCE I I _�/ /I /,� M I 11 el _zz�_ , W/P H IE 66.7(12"CMP E) 6. DEMOUSH EXISTING BUILDING. i I., JDIS', W/P , / �� __ - 1� _�� - � E 66.8(8"CP S) / / / L - W * ,__.,!�_ �,t BOTTOM @ 65.5 / / '.., 04 FUEL 01 PIA /.-I-,- , r. "'6- ...L_W -�- �tz� ri� 1: ____ , �v J-�� 1� .. ­­��_�_._ .,. 7. INSTALL CONSTRUCTION ENTRANCE AS DEMOLITION / / // z .A �, "'; - " - __4 IrL I I I . . lzz� ,,:.: -�lf 7/ ��: vv -"J/ 1/1"... � PROGRESSES. (OFF OF 6TH AVE. ) / ,/ /,� ."/ / . _."".. .. .�` -,-A-- ,-T / I I I * lz�l I I STOP"STREET -1 / , "LL _ _Z ��: N . 1___� ce 8. CONTRACTOR SHALL TAKE APPRIOATE MEASURES TO - " -� I / / ". , ,� - �_ - -1 -4- 5 TTY - / � �.-'., ci -3 STOP BA RIM 70.96 - - - - CONTROL DUST DURING BUILDING DEMOL111ON AND GRADING. . / // 1_4�.L!=�� NC. WHIfEI ) 1:.­1. _6T / /" LSTOP! - //* /, / / I I - ._', �­ If 2(fTCMP NW) , / / // // / ­­­ ._: _.... I :11 /"/ :! - ­_. .­:� , . I . , . � , , IE 68.9(6"PVC E) /11� 77�1 :.­: :'�:",�:..::::,.I..'.!%:-;.�.�::*�, _, A " .:� . J,� ., � ... - , :'.. : :� _po, , I:-:-:-:, ... I , � /,�/ / I .1�. , , , ... .� �� . . � ,�, . .. / z .. .. / / ff � .:­. 9. BEGIN ROUGH GRADING FOR NEW PARKING LOT. , , , / I /� - �­. 1. i 11 / ,, - .1 . // // / , // // I/ // I . . 1. [ :�:.:,.: I IE 69.0(4" PERF E) /�, / 11-14t - . '.., . If 00 �.� �,., . - / /// / /,., /// -.11 1 pa . I I ,. . I I ;:.,. " , ., FINI H/ L9 R/ / / ' / - _1� I I . I 10. INSTALL STORM SYSTEM. " /- , / , / ,.--"/ ' / / / ', / 11 � 11 --i - I cm, I ��t / " / I - , / ' / V, - ; , *�D - - CB ' // /--/ / , I ', ////-� CONTRACTOR NOTE: �tt, I p - , I / ' ,�/ - . 1 3p. 1 � I - I // /,/ // ,,, , 11 I _j CE6 ,�� � �1 I ..­. Rim 70.05 11. INSTALLWATER & SEWER. I , "" TIU-nES IN THIS LOCA-nON/:: , V_'.-�X-j " ,� I ..,_ .. I /,/ , // ", ,,/ / /ALL U , � / ..'". , / /,/ - // , , � _. i7" IE 69.0(8"CP S) 0 t'. / THAT NEED TO BE RELOCATED f4i - - e ::. ��:��:� ­.: SIDEWALK. / 1�1 - / , 0 .1'.. _1 I � 12. CON I I.. I .1 o... :... - � . - 1. ... . // / / / OR DECOMMISSIONED MUST BE �.,..�' I., �..­., I:0 - .. �: , .. .. F.;­ ; I , � / * / I ('% - .1 / - ' :., "::, � I ..�;:z I I .1 ... . // �7/� - �1, ::: , I ;,..:., j / " 'o - NLt(AL .. , - � - _.. ,�;� " a 13. FINAL GRADE AND PAVE. I .. : I �i / / / / 11 . I �\ - - - 1, : LLJ r ..." I ,/ �, I / /CONTRACTOR. ,...... , `� , � � I i :..* ..::' / / ,;, ,,,, ,� , /..;... ,:.*, ! I .si: � . . I .1 . /I I 11 Z/ / ",/ /, / � :..... I . I � , , ':.:L'1; 14. CLEAN STORM SYSTEM. �, � 1 42 2-1 1 ' _Z " / , // ,/` ,,,,// " / . . / I I '] , 3: �- ---�,- / -7- 11 / / / , / 11 �, /, / ,� / _�­_ � - _; : D I .., 0 I I/ /I .1 / 77 , / / - / I / / I .". / '/ / / I "AI z ...:.Nl, I / / I.. i I TION. / I / ,,, jvl U / , I., i � . 15. FINAL INSPEC / 1V(1!,St0RY, / ,/ , , " , 11 � .. ,/ , '. , / . .1'.. 0 / // / / / / I � / " / / . - \ .� : � 0 / , / / , ,� " I..... -1. Z / / /. A / I / // .� : I I... , 4ASON,Ry B'UtLTN / ".- , / /I " - � I _. i � ,,--'-' ,- / /* , - - _� .. I -.1 , / , / .,. I ;�i: . / / ,/ / , , / :... 1� / .... - . � . . . . / / / / I , .­ i I LLJ �1:i:... ... .. . .1 , . I . . ... U. ,� � : 1:1 . , / :, i . - ;: p I / , .1 / :;�::�� , � - . , I I , / " , :656"64�y / / / / / " / �..�: .4 ',�_ 1� I / // 11 / / , / // / / // / " ".. : " _. / I / / / / �_-i - - I 1:..', %_ > / // I / / / " / .:_ . . f.: � ,-- I I .:::: / I . .1. � . I ._; I "I / I/ / I/ / - I , _.. I . co / / // / � / // ­ , ,..: i .� / . I , , - - - - " ::,� I :.,.., I— . . _,: - i __ " - /* , /'...:� 11�::* < ..�, _1� , - / . I.. CL � I :q. I / // I/ /I 11 // / / / / / // -, - I I �::.i.; i Ld - I I.... , -/ / �,::q... �. I.:�, .., ,. ,:,:., I , � . / .. Q . : - / , , ,: ... - M DUSI rMTROL NOM / : ,_,..� 11 ­!, ..'..", / / / / -, / // ::::�.::" e I � / / / , ... 11 �� �. . ,,% ... .­ K / / / 1. I.- - I , - - , - 0 / / " � �, ", 1. � 1: . I.. ..., . I .... I . '...., / // ,/ / - / // / / / / ::. \ i . :-�� ..�;; ... ,.. - .11 :. I,-- ., " THE CONTRACTOR SHAH USE THE FOU OWING MEASURES TO CONTROL , 1/1 / , // / / I . ;;; . \-,. .1 7r I ­ / y / I / / / - / '/ � "" / ­: .1 ­ . : I I / "/ I/ / / ,", ,/ / ,,,, ,,,, 11 / - - ... ­ . , . . / I I ., I., DUST DURING CONSTRUCTION. - : !! ,. , . . . , " " I t - . / / / I " / / /, // / / , .",/ I ,,, ..,. . .�� . I.. / /" ., " " / // , ., �, / , // /. / I / 1� / , .1 I �.­ " ; �_ I 4'. , . . ... I I ,� "" "" / /I 1.1" / / -/. / , , I/ "I / / ,., "" �', / . Ili . "I . . . " 11 � I / , .. / , . . � . i I . . LOVER TARP. . .."', ".1, / / � ..' // " , / /, / /1, , , / "I, -.- - - -.r !� � I (o . 1. t . 1. ALL TRUCKS LEAVING SITE WILL BE COVERED WITH ROL .1, / / " , . / / , , / I "' � .� I / ... ( I ,/' ", � / " " 11 " � . I .*. N I , /',/ // "", / / // / / "I ,.1/1 '/11 I / / I/ / / //.././ / / """. // /" -: - \ . ! // I _. ".. . ? � / I " I I �._�.. // / , // ", / / / ,,,, / '/ / �� ..---- ! .1. 2. USE WATER SPRAY ON DEBRIS AS NEEDED WHEN LOADING TRUCKS. 11 / / .., , / / ..'' � . I .,::, . I ", / // " "I / / "', " / 11 / I - � .. . . I '// / / / ,//, //./ � V I / / "I // " // // 11 " I I /:. \ I : , I /I / I I , ,-. � i . 1 : / , " . , /I I/ I/ / /1' / .. .. �� I / / // / / [ * "I / " � /,11/ ". ,/. /,/ /// /,./1 ",/ 11", , " .� __� w I ,'' ­ I 3. WASH WHEELS OF THE TRUCKS PRIOR TO LEAVING SITE. / " ,., / // / ".. - - p ". I:- - ..." / , 11 - .: .­ � - - ,.. I I I / 11 / ., / / 1."", / / . . : ... I / , , / V - I . -, 11 .. 0 .., 4. CLEAN STREETS NEXT TO SITE NTH STR I—. I ,%*, - . %.." i .1 / � , / / , / I �­ -1 i . I / / // / / Z / / / // :w . , . 0 [,;.�::, I I / / / // , , / / "'... ­�..:,...-. ­11.­... 11:1. ­ \ I *-...� : /, 11 " I - I ::: - �%_' . / :": -::: .:�':;...: .. .... 1, � �_�� ... . I 11 - . \ 6 . I /,", / , /" // / // /, , / . /`­', ��.'� � � / / " / / ., , // / I/ - I " �..,,-i::", %. 0) k -1 ,O/H E&T&TV 5. COVER PILES OF DEBRIS AS NEEDED DUE TO WEATHER CONDITIONS. / / / / ", ./ I .. I " / , / / '.... I , / . / I �,.. . �.: 11 / / / / / / ���, I ! �:� �. I I/ � / /� -1111: (-� �;, Z:�V- .. / � / / / / /, / / / / /// / " _1 7 . . I ... �, �*.- f�, � . , - � I , I.. � . .. � '7�1 I I - ' - -7-,- - 7- � 7 //- J/ / / - -\\ - - - - - - - 7-- 7 -;----7--/'-7- 7 / / / , / I , / I // / "" // / /I/ /// /, / , � , / I", / 1. I / / / A/ z I / / , , / I . - 9 '­'. ....., � I I , . - I / ­_ � - -- , I- / //)�- �/ / / / . I I % I /, %..: I . . . I/ ­... .-C), I I , I / , / I I \ / f/1" . I. . , � / / I . I i I - ,_ � / w ­­ -,'�: 0 1". I. ,� �... ., ....,:� _ I I ., - - E w:,�:�:�. I I 9. .; ".,::."..",� , - I * - -1 _._ :­:.' * � :...�­ 11 < If C . wj 1�p . , -1 ; I 11 / " I ,� ,-/,., ,_ ___ I , , ---, - \ , 4 - - . I if I I x a - I / / I / � / � 4 , ­ ­­ 1, .;,:� . .1 ­ ,­., I.I., :__: ,,::, I .1. :: .'' vi I- - I � , . I / - A . .. )( CI I9D 1b. GRASS ro I ? , / p ... . .... li4 ... ?I :..., . I ,. . '�� S, 1) t� I I A I I ; - MH - I§IM 68.31 / 1� . � ,- M 68.30--1 RI - IE 66.8(4 "IP N, C A P P E D )t1b"4:' ; I 1 I 1 > - .. " 11 / n� 0� 0 C-5.1, ; / -1. .. / "\, f�- - I (b , I i 11 U / I I . /TOP 4"IP 65. t ­.. \ 1 " - 67-.*3(YCP,,N) // "', // / /I X _ / /` // "/' " . , . / / / - ,/DIRT 065.0' 1 , / I / I " i I 1 1 a- 0 z < . .1 "" zE ;:"?,:� I .. .�::� _ ''.. ­'� I .1. / ­1 �'11. 7 . _Ir \ -.> , �. ro '. , tij . .zz I 1 � � I , , I i __'� c6 i N � , 1�� I - ; '.. / / ...... :1. v / / / / I /,, , " 11 / / / 11 / / \, /// / /' / , / / ,/ / / 1, , / , � / / � . . / ; )"', / / , " � '/, / - , , , ,,I_I�W!p/ ."/* I,-, /, , , � / ./ / � / 11 / I I __1 1! I 0 :, % I / / , � 1: � * __ ..I- - __ *1 ��:�, I _r__ '�Iq . �_.` I . ­:� SSMH __ i I , : RIM 73.18 00 . , ". : , I ::, IE 67.7(6"CP NW) ,. sq11 - ," F.': _F 7: ...:1. I IE 69.5(6"CP NW) . . I 1.,_1 .., I ­. 01 [....".. I I I IE 66.6(8"CP E&S, CTR CHAN) .- ,:� *. I 0 .1. � - , zi �-. .!. (I � . I : ... - I ... I I �,.�_ ... , , . . i k. I .1. I- I -,.�:� 1 1 . . . : If 1-i:.� -i . 1. /_� I - �_... . I / i "I (0,. , . ­. .. ; %.. , ,;... I \ I : , :� I \ u I.-,. .�:,.,. I \ ... � :., I i Il \ [.-J:� \I.-i..... . - .... , .. - % . � � . ..; I . . � CMIR&CMR N - ONLY SINGLE DUMP TRUCKS WILL BE ALLOWED. WILL BE ALLOWED. ,�. - 7 ./ - _ I 11 / ., I / " I I.. I ui,i�. - - I . � / / / /' / " / " _j - �oil > -_ I I--,'. I ��,-, I .11, N I ., / �*isw`F�pibR// / /' / '-; / I I * 1. "', / " . ­* / I ,i:: / I :<. ,�� � / /. , / / ./ / / // , , .�., :..:� , ��i,:.-:: ,." * I 'i tk I - , 4, 1 �. /Ij -11 < :.. 1.�, - !! ,�� --- / / , "/ , / / /I ./ = .. � ..'... :�� ,��. . 11 / / , .: e� . I :�`� I - / / / / - --- I / / ,- , / , , I " / I // //,., / / . t � , .-:" / 7 " ::, / �,:... , 11 I I, � . 1 25...: 1. 'ry , , 7 I ,/ I / I / / / /' .. A I [j.,I! / �, , I " zz_:____�� - // ,/ /cI ." / I / / , / ­ - - [.�41 :1.,F, 4 7 - �_- . / / / / ,/ / / ph as. 8, / META I HANID / / // / "I / � / I , I V) :�:::" I . I , / < ­: ... I I - �11 , � / A ./ / '. / / i :, _- _"? / . %, . ., - I \\- R, L ./ / / / ../ � I � . N... ( I / 110, A P4-_'1'1­ I/ ,--? ,/ , , , ,-. .- - PEQ� -1 �_ , :!,. / - ,,� - I /// // / // / .,�/ /IEX7.8(4"I N/CAP / I I � y I 11 I .� _1 I / / " I I :% � q­ 11 � �.. ---,. rIL, I 11 "4 ' ` I /I , - , -�- -/-- - - / / / / / / / N tx f � I : I i . I / '/' - � . 1. (b I 11 / / / / I , , F-I.. 1: � I z / 1) R T/ 96 0,. 5 " / ., , / / ., / / , I / , / N_ :�,­ - A &1� -.1 1. I.. .1 ... .1 I - / , 1. / / / 11 / -, - ''. - r � "q- I / / / / / " � I �. I k;% � , e , I , '. "I / ,/ . / / / ... . ! �!���.` ,::�' / ' , , / , / / 11 11 / / ", / ..: Ln .. 1. I .1 i � 11 r-ir /I / / / " // '. / / " "I, , / / I 1�_ ... �! , - .." / "I / / " � ,/ / / / - �.; V) ­. / b Ch, / / / // / , , , / - . .. I �. - - .: . � ,�. I 11 / �,/, I / "/ /1, I / L . ...'.:, 00 �..� � �, � -� , I .. . :�� . ltzlf " I/ . /1 � " , /11 / ,AMQLG� � I :� 3:: ... f ��­ - I i /,/ /M d/LTI �T/QR� / , / . // .. � ..- 0 ,:� ". , " /I 1;� : .. ,: , I ­. / / /'/ / , / ,""//" , � .-.,� /�/ 4bt - I /, / / / / / ,/, -, .8 / . . ::. I ..., " "..... �1. / / / / / / / . :1. :,­ ;:::., !, .: �� I//r ... . /I , , I/ "I , / / -. / I.. V * ... - / / / ' R� E / / / , , .. / T / 11,,14AXN`� �UJCDIlkC5,111 /I /"'/ / I , , / I / ,,7"2.6 . '.., I � . - r 01 *' / / � // I I / I Z ", / / , , / '. , / I/ , / " / / %KSH,,FLO0fZ / ..­ ;1.,. .. � '.`.*,,.,:'* , t I - . / . / / -, / / / / / ,/ / / ./ 0 I ..� / . ­` I / -/' / / / / - D .­: . �.,; I 4,46y6Q.t,;F. / / 11" / �. 0, I " J", " / / . / , / / j / N .. .1 - i / , , /` , 1. / # �', � I/ / / / / / , /11 ,�� I / I / "', "I / / // / ,/ / .�, I 1�_.. . ? I // / " / / / / /� /, / , ", !_ W I , - 4� / / // / I I / :,.�F :. ....­ �­ - � / / ,, / I/ / ./ / 11 I '. ., / / z , / ;;:, :_ / i .... . ";: .1 � I / . tp,­ I , , ,:, I.0 / - GRASS I / / / / / I I / I`, �. / / -�.:,]�-� .�7e ....; . I . 1.a..!... I I I- / I "-.//.// / / 4. / / / "I ... // / / *` 1:. , "I - ... :1 . .. / I , / / I / x / / / / / ", ,'/ .11 ..., - .:1.. �­�, / 5� 1 / , // / / / ;.,� I I . / __,_4___Z . z 11 � .� F � , '....A. 1�/ i / / I ____ /::w�t ......... .. ...... I ., I / / 11,1, .�_. " - , - - - - -, - ''. - , 11/ '. I +-_ / "/ :�­ I-_ ..4 / / ,,, , � I Alb - - / / ,1 :ill , . - .. � / "I I / I . I .,�.. I 1. . 0* , I. ­ )0.,-�t2l:: / ro I I I...�� .� .STOP" .., / _�, / / / / .. . 1: . . - ,: . . :� I .,."F... ­__ / ____ ,I----- / / / / __� ­. 1. �. STING - 1/ ��-�, .., "� - , " - I I / " GRASS :,�.,. I � �� ...:,� z I I / / 0 �­: i;� X1 I . I �_:_., ,'.� " -,­�. EXISTING " \ I )m G ,ASS , .. , I - I E HYDRANT .� , . I I . �_ - I ''I 11 \ .." 0. -*- O., . . I S,89*46 - , ­� �.� - .... - � . .1.1 : I, .. ;.- ,:..: _, . IN ." 11 , ... ­. 4TH AVE" . It �?7��, ,,, � : " - - . .....w ... 0- - \ : I . , " , , ��.'. - � . 11 _ I K��' I ; - - . :,; ,. .;�. I%. ,,, , I �i I I .1 0 - \ \ I ,_ .I., '�i I "STOP" , " �,, 0 �.. _. , I �, �_ - . / "DALEY/ .2 �' :, i , " . � �,. , 11 I 1 '05 254.79' 1 - - --\.�__ -I _/ .. .-,!�) 11 ,� �. / / /I ____.,,� / / FIRE HYDRANT I v, I �1 . - -_ - I - 3�: � oz FIR I � \ I , I - I k " , -I.: - ... , ­- ,___ " ; \ I -.. .1 - .. ::�:v:��- / 4qb) .-, _/ I / / , _N w ,,, up p. ..., t1lo " 1, .1.43 1 �_ Q, 11 O_/t I - , lil* . � I - I .. ." - - A - - X. � ..... ,----- I - - -.1 . 1 - - - - � !�K . .k,:D " , � " .,; \CW , \" / T44�� :::[ - �_ &TV �74 If" _�, _� / "I � I iLLU -1&IV V, - - I/ 1"L ,-- \ I - - - . -..:_ . I z ­­- .. . ,o I - - -,z :�.� - - !­ - . ­�� - - __z _.ap_ _ Ci i .-�,' 'b/H T&TV ._ I - - - - - - - ,.. �.;,.: , - " ., . .i:, . ­ ::.. �:;' : .., ".., . � � .- 11 - - .,::; � �-;!.:.._ ­ ­­ .. I : ,%. ��"...I.i.. - .:, : 1- ." , �: (L - - . " .:­ , " I I n�:,. � .... .. �­ . - I ., ... .��,,,....,!',­,. : �: �:'...,:::­, �� , S,! �:: _.. '' �,:� ,.�;:­.:.i�. �r:,o.'�,�:].�!;i�� ;..­-.,_ : , ; .. � .. _Z ..., , ,. . :l­.!.,­..:.......,.... ­'. . 4,; - I . ...: , . " ,.: �� - :_.., . ..� . .. . . %_,.. .1c .:: .`-'��i*-..,� � . . _�; .- .--L­ - . ­ .;;,;��-.­�_­ , V'- I , - ­� -�,i---.!�;�'�'-,"4 C . �%v RIM 75.26 : , � ... ­. .-.1.1 �.-� 1. ��,.­­­:. I ,�._. 1.11'...'..... .......­­-.1. _.�..�e­;. �, ""..'... ,. _._�.. ,�.1­_.1..:.`,.,.­ �.Z:':!. ...!c,:_ " �, .:', - ... �,...,,-"�`�i:�'_�_`_, APPROVED FOR , , . � .:i. �&� ., , , - .� 1�� ....-I ...... . .. q7 - . , , 1­­­,.._.:,,.�:i:;_. . I ;:w, - �$ 11). IE 74.3(8"]P W) _:. �.:. ; 1. .. � .1. p 11 M . / - I ___1 I - 8" D.I. \�L_ - - - - -1 - - - - _ 8" D.I. - - - - ___­�_ , II - 8" D.I. W - - c I I S RUCTION "" ' 11 - I I I .. - - I t4i 7-1- "/ -A . 1 -7 / 11 I S89*46105'j 685.71' - - - - - Rv _+_ - - - - - - > SSMH . # - - . _j 92�_s - - ---.-- - - - �_ .1 / o< - - - - _1� RIM 76 28 . 2��/_- - ��: � v] �_ . =-==- ==- _ Lu__-1.1-1� - - - - -T-- I \ < I IE 65.3(8"CP CHA I Engineer -- I / I I \ 0 UIRFAC�,116NUMFNT LIJ IE 65.2(10"CP CHAN W) Dwe AI - ��: ==> 3;: : ' J�R<Sj DISK WyPUNC I r . . I N / / � 3: _� --,3. . L4 = ; = = . . r< IE 66.0(8"PVC TO ELBOW S) I I . 11 52 __ ___ - ----=== =_ __ 0 IE 67.4(8"PVC CAPPED) r-_ - . UAt)kK __. 0 c - - - - - - - - - F) --io - .- -r.,,- - - - -4 /__ , __� // L Q) ,_� . -==== = ==== =__===:== - - - - . I - / �,��. IE 68.6(8"IP SE) - __ " . . I- ­.'1­,'­_-1 - -�,:: ... �� 1 I"— - ­ ", - ". -, �;: I ". �­- ro. I . ­ 11 � : - T',,,,; -., � ,`; - " "' �, �x , - : . ..".. . ... .... I - "I. . ­ - . , , ... . ;.­�� .., � , .. . - ­­ �,_x " I .1. .� ., I -11 I - . �.,,-,._;-�_­,:z� ... :_­�_-_ ._:,".. ": ..� `1_4:1:� " �_, � "., - �7" "' .; ��, : 7_;� � , I ­:­o .%:1A1- � �. � ._---..,. - I ,:�.;. 'OL 1�, I ,,- n ===- , , "' il�:� I . !�. -.. -, 4 ,: ", I 71�_; �--'-,..: -, ,1:...., r - _� , �', ,.. � �ra'1:7.�, -, - -:1 - ", -1 �� .. .:: - 11� .. r. � - -Aly.,;__,� I I . ;-N.. '. . � _� .. �_ , - .:�.;. =14 , ` - - .". ", -I- � :�, ,\ / _ ___= =�r_ =�� -1 :­ ";�. 4'...!"..'' *'-',� 1� - � - 'i,*1',',�-".;,..11_* �' " " -.1 i� N , 0 H E&T I __ - ...'... � ,". --- 11.1 :� ;.. I I � -� _- ..�� 11 �,_ _ ... , -.,.. , - �, 1, ",'... -, .. - ...... - 11 :�,._ .. , . �. , .; . . I : O/H E T&TV a- -1 �.. 1. , 7�,�::! ... ... ��,*Y-,, ___ b, - . - - �. �, . _�� . - 11 ...., - I - 4 __.y7=rz----_ 5 - - 4 = (_ 91 __*W1 ���+I-E­44 ;..,*; ;­ - - - __2ZH 1;1�01 uI­1 - - - /_ _:� , , - 7� 11% U4­11 1�_ jkt-_ o 1 . ­ I __f - r . . L_ - - i lim�l - - - - - /I - y w . �.....'­ .) �__ - � - -7-L- - - _j I ,�" it I 1, I - ­.J." - - - - ____� - - - - 7=�� t __ -.:��_ 1. .. � I -_ 11 ,:1-11,_ I �.,� STOP" I I I _­� . - , .: , i , I 1; � ��' I , - . . 14& __� b I r LEY/6TH AV . - - - , � - "STOP" .\,-/,V BENCHMARK "B" cl IN'- SDIvII I 5 I\t ��' CI ,MH q��, 1�1 SDMH CI ___� C! -.,- SDMH ELEVATION 69.59' RIM 74.91 RIM 76.10 RIM 75.69 NV71 rz rn RIM 69.06 11 , ,,, , 1r: 77') it' 9"CP N) IE 74.3(8"PVC NW) RIM 66.09 RIM 65.14 NIM 01+.tjz) r"11vt u . Ir- /,-).fku r- I . IE 55.2(10"CP E) IE 61.7(12"CMP E) IE 64.0(6"[P W) IE 64.7(6"IP W) IE 63.1(12"CMP W) BOTTOM @ 72.8 -� IE 71.8(12"CP W) IE 74.6(4"PVC E) IE 55.1(12"CP W) � IE 61.5(10"CP N) IE 64.0(12"CP E) IE 72.2(12"CP S) BOTTOM @ 73.5 IE 55.5(6"CP NE) IE 62.1(6"CP NE) IE 63.2(8"CP S) IE 72.5(8"CP E) v BOTTOM @ 58.9 BOTTOM @ 61.6 IE 72.7(6"CP NE) IE 72.4(6"CP SW) I/- /-5. j e 4 2. 221" S Cri I E D U L E 4 G -A IF ' 3. :5. 1 1/2- SCHEDULE 40 FOR SPRAYERS r- 1. . )­ 1. -7- 2% 19 - - -1 li��_OPE - I / 1 \-6. 1 2% SLOPE I I _§L_0PE L-A \',,_ \_ 3� . . PLAN . 3. . I- 15'---r 15'---r 20'---T 15' 50' 1 ELEVATIO I r- 18, -1-L . if ­4 t I ;1) SECTION A - NOTES: 1. TEMPORARY CONSTRUC11ON ENTRANCE . 2. 3- TRASH PUMP WITH FLOATS ON THE SUCTION HOSE.' 3. NOZZLES: ' 4. 6" SEWER PIPE WITH BUTTERFLY VALVE. BOTTOM ONE IS A DRAIN. LOCATE TOP PIPES INVERT 1' ABOVE -BOTTOM OF WHEEL WASH. . 1 5. 8'x8' SUMP WITH 5' OF CATCH. BUILD SO IT CAN BE CLEANED. 1 6. 6" SLEEVE UNDER ROAD. WHEEL WASH \1 NO SCALE 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 981 206.682.3460 FAX 343.9388 - - CENTER I FOR THE ARTS * 'o. c - I � .,e nr ­-Q", . 2&328 N.�� z1al � /011AL ' - 131105' J-rSRES 12/17/--a(A I (3 04 0 � z vj 00 0) � "o M < J,­ v) o >- !� - ILLI �_ z M =) �_ < Lu :-r (7) V) 0 I.. 0 Z I'd- tt � a: < _j .Id- rij * 08 c14 I-3 Jd (n o:: 11--% (D 0 0 LLI LLJ I-- V) cq ,--, uj z < LLI 0 o:: _0 Z L.j > LLJ < 41 3: _j 5; w 0 z (/) C-) M =) 0) CL.) M 0 CIS! FIESUB - ,�,_j 3 1 2005 3UILDING OEPARTMENT CITY OF EDMONDS REVISIONS F-ft DAIE � . BY ___ 1 04/13/05 - WPG/BDC PER CITY 1ST REVIEW - 2 07/01/05 KMC/MC PER CITY 2ND REVIEW - A 7/1/05 WPG/BDC PERMIT REVISIONS . - - - - TY COMMENTS - I . - . - 'nu EROSION CONTROL 11111111111111111� DESIGNED - Jjw DRAWN KILT CHECKED BEIC DATE 10/10/03 . CADD FILE U: \LDD\2003019\DWG\XE-GRD-dwg JOB NUMBER 2003019 C2,1 "I""" U:klddX2003019\dwg\xe-GRD.dwg, ERO-C2.1, 08/31/2005 09:05:01 AM SSMH RIM 46.86 IE 37.61 (10"C N & S) A SDMH RIM 47.07 IE 41.77 (6" TRAP N-WATER LEVEL) I I E 42.6 (6"C SE) SDMH RIM 47.64 INLET IE 42.0 (15"C NE & SW) RIM 46.63� iE 43.1 (10"C SE) IE 45.5 (6"C NW) UP CB RIM 47.00 C' A A A I N'f' KIM 74 72 70 68 66 64 62 60 58 56 54 52 TUH.MEV 50.00 WESTERN DRIVEIA-Y _E X 161 U ulm;l m 4 Mimi ONERMA"A -m-m-0a"-w. -mm IiiimiiiI w 6-111 Z lei ffel.,J -0, ��M 9-0 =00 0 0 0 4 IE a m ftow-i2l d1_0 A 1:141-14:11 swel .17A 11 0 I \ / / x- m I 0+_00 EV 04� CAUTION: SANITARY SEWER CB#1 TYII-48 0 CROSSING W/SOLID LID ASSUMED IE=38.75 RIM=47.85± CONTRACTOR VERIFY PRIOR IE=42.53,15" TO CONSTR UCTION IE=42.53,12" 0+50 1+UU 1+0U - N89*4832"W 168.00' 0 0 PARCEL,C 00 N IAII�HT PARKING LOT PROFILE SCALE: 1"=20'HORIZ 1 "=1 O'VERT 0 00 CB#2 TY I SEE STORM OUTFALL RIM = 48.5± PROFILE ON LINE 2-STORY & BASEMENT 3:: SHT C2.4 25LF-ROCKERY 0 PATCH EXIST MATCH GUTTER WOOD BUILDING 0 1 ASPHALT. MATCH IN GRADE MAX. HEIGHT 2.5' Cn � > 56.5LF-12"SD . \ i KIND. 0 H E LIMITS OF EXIST. CURB REMOVAL 0 3.49% IE=44.50 SEE DETAIL ON SHT. C2.4 - - - - - - - - - - - - - - - - - B & GUTTER 1 -STORY HOUSE UP I TOP=58.00 CAUTION: WATER/ CRO IkG 2-N SDMH SA)NCUT AND REP CE OTTOM=56.0 RIM 68.54 STO PlPt- PROPOSED 12 R E C L L U ASPHALT AND CON RETE IE 65.9(12"CP E) W LK TO CROSS UWIER E 412 WALK. M TCH IN/ K IE 66.0(12"CP S) - - - - - - - IE 66.3(8"CP W) WATER LINE./ . �ONTR CTOR RIM 67.71 VERIFY FIIJ� LOCATION & P L IE 66.6(8"CP E) T O/H E&T&TV N, 2 Nw) [� , - --- I EIEVATIOrj PRIOR TO p N 3 "W e''PVC 9 -48 BOTTOM @ 65.1 CONSTRLXMON --- - - - - - - - - - - - - - - - - - - NEA SSMH BENCHM RK "A" 4z : LEVATI N 50.20 SAWCU-r-., EDGE OF EXISTING U RIM 68,76 PATCH EXIST ASPHALT LINE 3 2' 4:�PHALT TO REMAI�I/ B IE 60.3(8"CP E) WHERE EXISTING 'A CB #6 Ty 1 !6) WAS. MATCH IE 59.4(87CP N&S, CTR CHAN) L RIM =66-5+ -rAl I KIMAI '7' T11\D n 9-K mic� E X I S TT-`­ff0 C K E R Y -10 ___r RELOG&KTED BEHIN' 2. §bLF Po�tRTY LINE. TC 5E� DETAIL 0 H_T� i v TC IL 0 A "CC ES3 SS M H TE=56.3± DETENTION VAULT INSIDE DIMENSIONS: Tbp=b3.0 9 1 1 9 MR125016ye 18(W)x 33(Qx 8 �kd B�TT�M=51., w=5j8 1 00yr overflov 90 MAX. WTR. SURFACE IE=46.00, 12"out IE=52.00, 12- IN BOT. IE =45.50 OP=53.0 'T/ 22LF-12"0 5.32% STORMCEPTOR 2400 (WATER QUALITY) 4LF-12"02.3% RIM=58.50 IE=53.25 (12-S) 7. IE=53.17 (12-NW) \000 INSTALL 24.38' loo WIDE DRIVEWAY n PER CITY STDS CB #3 TY I RIM =56.87 IE =53.50 CONTRACTOR NOTE: DO NOT CONNECT ANY BUILDING FOOTING DRAINS TO THE DETEN11ON SYSTEM. U:XIdd\2003019\dwgVe-GRD.dwg, GRD-C2.2, 08/31/2005 09:06:07 AM F �'Zz /_ - _� I - 56.g9,5 Ic 4- ff- 7 r UV IE 68.9(6"PVC E) SE DETAIL &4.2\� .0(4" PERF E) 6"R F P7/0 Z_ IE 69 6 45 7.4 'L \2 r,7 55 0*3 16 r6o (93 BEGIN CURB & GUTTER Ts MATCH EX FLOW ee '6) n7l'O CB NE"UIL G A ITIO I RIM 70.05LINE GRADES 1 0 IE 69.0(8"CP S) .4 CD V) A 'A 68.64 CONNECT NEW WALK TO A A EXISTING. MATCH GRADE. INSTALL CURB UJI RAMP PER CITY A STDS. 8.1 L C, F #1 ANOUT MULTI STORY MASON Y BUILDING IE=64.25 LL . , ..t - _ LLJ 52,156 SQ.FT. CONNECT NEW BUILDING > ADDTIO N FOOTING DRAIN TO EXISTING FOOTING DRAIN. HIG POINT FOR CUTIN NEW CURB 0 SEA LL U�;E�_\ 68.55 ISLAND. REMOVE ASPHALT FROM CENTER. 0 MATCH EXIST GRADES 1� )42 68.40 NEW SIDEWALK CROSS SLOPE (10 TO VARY. MAX CROSS SLOPE .:*A 2.076. CONTRACTOR TO COORDINATE CONCRETE SEATWALL C GUTTER SLOPE WITH NEW SIDEWALK v Nil CROSS SLOPE IN ORDER TO 2 GRAPHIC SCAIE .0 0 10 20 'to 8; MINES ( IN FEET ) I inch = 20 ft. EXISTING CONTOUR RIDGE LINE ---- R EXIST. SPOT GRADE NEW AC PAVING PROP. CB TY 11 W/ GRATE PROP. CB TY 11 W/ LID 0 PROP. CB TY I W GRATE IN EXIST. CB TY I Im EXIST C13 TY 11 Q AC PAVING x x FLOW DIRECTION _< DETAIL REFERENCE DETAIL REF. # REF. SHEET # LIGHT 2" ASPHALT PAVING OVER 3" COMPACTED ASPHALT TREATED BASE, OR 4 COMPACTED CRUSHED ROCK BASE OVER 18" OF STRUCTURAL FILL ON SITE PAVEMENT SECTION NOTE: NOT TO SCALE FOR COMPLETE PAVING AND COMPACTION SPECIFICATIONS, SEE SOILS REPORT PREPARED BY HART CROWSER. z. .".:. : MAINTAIN POSITIVE DRAINAGE. Q.) I I DA7VH R&EV 0 0 65.00 SEATWALL WITH 0-) 1 OVH E&T&TV SSMH THROUGH -CURB PORT RIM 64.79 �7_ IE 58.8(6"CLAY CTR CHAN N-S) SSMH IE 59.3(6"CP NW) 68.64 RIM 73.18 'CP NW) IE 59.4(6"CP E) j. T L IE 67.7(6' - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - IE 69.5(6"CP NW) 0 IE 66.6(8"CP E&S, CTR CHAN) :A" � : - / I I I I f 16815 0$ zi _A TING DRAIN OUTLET FOo TO THE SEATWALL GUTTER .......... I I MH CI I I DRAIN TRENCH RIM 68.30--YI I M 6 8.31 IE 66.8(4"IP N , CAPPED) OP 4"IP 65. - - - - - - - IN CONC BOX DIRT @65.0 74 72 70 68 rF-- _j N, > 66 _j CI 64 RIM 68.8 IE 67.8(4"[P N, CAPPED) 62 m DIRT @65.5 PARCEL C DAMM MEV 60.00 MULTI STORY 00 1khAOn ADVMHII nIKIr_ 74 72 70 68 0+50 0+00 EASTERN DRIVEWAY PROFILE SCALE: 1"=20'HORIZ 1 "=1 O'VERT .0 �Eg E m 0 -mm F IN MR 0+00 0+50 1+00 4466 SQ.FT. PARKING LOT PROFILE INSTALL CURB RAMP PER CITY SCALE: 1"=20'HORIZ STDS. f - - - - - - - - - - - - - - - - - - I"=10'VERT FOR TRENCH BACKFILL v REPLACE WALK AND PAVEMENT SECTION 0 AS REQUIRED. S,89 *46 $ 0 5'�W _�4 .79' SE DETAIL APPROVED FOR Ur O/H 38jV U TjWri _j tp Q/H INIV lip I wi. 2 � I v - - %__ - - _ __�]I , , e%_ n r t�%_r I t-% K I -7 CI RIM 65.96 IE 61.3(10"CP S) 7 8" D.I. m RIM 75.26 IE 74.3(8"IP W) D. 1. W iE 61.2(10"CP NW ERLA 8" D.I. W AS R S89'46'05" 6 .71' > SSMH 10 SS - - - - - - - - - - - - -- - - - - - - - - - - - - 10"SS -16 RIM 76.28 < IE 65.3(8"CP CHAN N) All 0 VRFAC M'ONUM NT w 3- ALE STR T f3fzKs, IE 65.2(10"CP CHAN W) cli 5R�� DISK JPUNC IE 66.0(8"PVC TO ELBOW S) AS(R) IE 67.4(8':PVC CAPPED) IE 68.6(8"IP SE) O/H E Eg 0 E) A+- E- _21/1-LE&T 1 -0 /H E&T&TV 00-01 CitIlEngineer Date 1+50 Call 2 Working Days Before You Dig 1_QfV)_A0A_r%r%r%9 I %JWW �T&."Or I Utilities Underground Location Center (IDlv1TND,0RWA) !F111111' A all I I w, ImIll N&I 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 98104 206.682.3460 FAX 343.9388 EDIm "ONDS CENTER FOR THE A DTS F\I ID - C- WA EMRES 1:2E7=/ C14 0 0 OD 0) Ld _j F- z F- 0 Z 3: -j 04 0 a LLI F- v) 04 Ld z Lij 00 Z Lj > < 0� 0 z C-) 0 m 0 C-4 BID SET 18 JULY 2005 RF.sus AU IS 3 12 02 �`; SUILDING DEPARTIVIEN7 C17Y OF EDIVIONDS REVISIONS ND DME BY DESDWT4N 1 12/04/03 GLD ADDED S17E SECTIONS 2 04/13/05 WPG/BDC PER CITY 1ST REVIEW 8/28/05 WPG/BDC CITY COMMENTS 8/30/05 WPG/BDC CITY COMMENTS 'nu GRADING AND STORM DRAINAGE PLAN DESIGNED JjW DRAWN KLT GiECKED Jjw DATE 10/10/03 CADD FILE U: \LDD\2003019\DWG\XE-GRD.dwg JOB NUMBER 2003019 C2s2 HIM 4/.04 1NI FET IE 42.0 (15"C NE & SW) RIM 46.63 IE 43.1 (10"C SE) IE 45.5 (6"C NW) UP O� C6 RIM 47.00 E3 IE 44.9 (10"C NW) EV CON7RACTOR NOTE - EXISTING WA LINE TO BE PLUGGE R ,9 > 3 CAPPED. STOP SIGN 4 0 =M= N07L EXISTING WATER UNE TO BE PLUGGED OR CAPPED. ""'USE I -STORY PO f M 33 "C 0 .2 N`A BRICK BBQ BENCHM RK "A" r_LE_vA11?N 50.20 Sit 0 f gtx4sTING CROS FA R E H R T D AV N 4TH AVE" CON7RACTOR NOIE- 4 EXISTING WATER LINE FOR BUILDING FIRE A 04�' 00 Lo SYSTEM TO BE ABAND REMOVE GATE VALVE 2 MAIN AND INSTALL 1-BLIND FLANGE, FL W/ CONIC. BLOCKING N 7 C) v I A I oc) ul Iq .5 7 A. SS KIR IE= A 12" 0 E0 SE� ­14 0 Zak �5 ON S H i"eg SM RIM 64.79 1E 58.8(6"CLAY CTR CHAN N-S) IE 59.3(6"CP NW) IE 59.4(6"CP E) REMOVE EXISTING SINGLE CHECK ASSEMBLY AND VAULT. CAP EXIST�ING A" SUP -PLY LINE. CONNECT NEW 6" FIRE LINE TO BUILDING LINE. VERIFY SIZE W/ FIRE SPRRINKLER DESIGNER. 1-6" DOUBI E DETECTOR CHECK ASSEMBLY PER CITY STD. E7.8 & E7.8.1 DO NOT KNOCK OUT DRAIN IN BOTTOM OF VAULT. N89*48 32"W 168.00 0 10 r- 13�: PARCEL C 1 00 T 2-STOM,/ & SASEMEN WOOD BUILDING ///ZZ///ZZ/////ZZI .4 M x GRE NHOUSE GRAS 0, S. OF RI VE &\ ARKIN�\ R14 67.77`I`�# ------ �_\ N *48'3 9vv CP E) BO M @ 65.1 4,7-0 24" k1l N 16 Er_`,.1 2' ASS A . .6 54 7 14 =MAC= NOW. - EXISTING WATER TO BE ABANDON AND OR REMOVED. -65 m M. 6m. 38LF-6"SS 01.45% ssco RIM 8.2 IE =62.4 E6.2 INS LL 1�' IR%9ATION WAiR METER NTH UBLE CHECK VALVE NSSEMBLY PER CITY STD. DETAIL E7.6.1 5LE---2"' SERVICE LI <0 i BACKFLOW PRE N FC IRRIGATION M R. 1-1 - AQ IN LL A 2" RID OVE C.,ROUND E IND THE DOMESflC ATER METERIN A ATED HOT 4 BEND,MJ BOX. PEP STANDAqDSA_-C C. BLOCK "_�2 1'61 L F- 4 n D.I. >. 18.5LF-6" 1-4" 90' BEN , MJ ��CONC. BL K ,2 OZH EL---' SDMH RIM 68.54 IE 65.9(12-CP E) IE 66.0(12"CP S) IE 66.3(8"CP W) 10/H T W C7&T&Tv -- - - - - - - - - - - - - - - - - - - - - - - - SSMH RIM 68.76 IE 60.3t8-CP E) IE 59.4(8"CP N&S, CTR CHAN) GAS ­4� t51,111 -4 d CB RIM 69.98 IE 69.1(8"CP E) 0+00 4. UEAU END" EXISTING INLINE VALVE Tn PP Pf7KAr)\/Pn RIM 70.40 IE 65.6(8"CP SE) IE 63.1(8"CP N&S, CTR CHAIN )CUT IN NEW VALVES PARCEL 1 -TEE, FL B3-RESILIENT GATE VALVES FLxMJ TO OBENCHMARK "C" 1-CONC. BLOCK A ELEVATION 72.47' 1-90*BEMD, MJ ��_Jp Lt�rll U 0 E& 6 " C. I. W Q H E&T&TV 1 SLEEVE, MJ CH S -WAL CONTRACTOR TO VERIFY 6B SIZE AND LOCATION OF RIM 70. CONNEC T`ION PRIOR TO < m JE 69.6 6 P EXISTING ANY CONSTRUCTION. Ll BOTTOM 57.9 FIRE HYDRANT 1- GL N JA-A 11 �� - - 59LF-4" 110 B ABAN ON I I I - 1 4 / A* '4 m * . ' - - -6 - 7A -�d ;41A H #1 =65. 4.. 6�_ N E LI Z_ UT) o ERV 603 72.7 OC) TO DG. ro FINIS FLOOR D ES11 2"6*' 22 BEND, MJ EEI 411M C� 2-CONC. BLOCK 3 iA R S ICE BLD 4NEC- �XIS�NG V) En lu OD INU Zi =yV 4 "Al MAIN. R Z R y - I A IF ILI Z A CD 53LF-6" FIRE WATER 4 RIOR IN C14 QR Vol 'ULTI STORlY rR LINE. CONTRACTOR TO A 4 VERIFY PRIOR TO CONST. MASIONRY BUILD #A S x 12" A T, t� Aq. 15 4: JT_ Un A .10. A' STON STRUCT RE 6 WITH PLA A UE A SEE SHT C2.4 Nk : - 'd : 4. FOR PROFILE OF i x1 YE NEW SEWER MAIN A N R CONNECT TO EXIST. 4 SEWER MH IE,(8*out)=58.8± A -M IE,(8"in) =58.9± 0 itERU A CHANNEL EXISIING 4' wq, MEANHOLE TO ACCOMMODATE A. NEW CONNECT]IONI. 72.72 A' FINISH FLOOR 1 DE co - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A 01 .4 4 A �,q 4: I' A GRASS MH GRASS CI RIM 68.30--J 4 I M 6 8.31 4 IE 66.8(4"IP N, CAPPED)F OP 4"IP 65. IE 6. 7/3(rCP//N) IN CONC BO DI 4 4 < ko 4 X1 S vi D 0 A . 1513 FL R Pd _j 4-- < 2 "A _17 n :A M .8 MET 1HAND""' N CA E R k PARCEL C 191 5 RT I t 0 1 L1 r" ;Ii - . I METAL W-8 - Ami, NX411 "111w, j SDMH RIM 70.72 CONTRACTOR NOTE: z S FA E MO qUMENT IE 66.7(12-CP N) EXISTING WATER SERVICES nm,a H IE 66.7(12"CMP E) FOR FIRE AND DOMESTIC /Pu E 66J�(8"CP S) TO BE REPLACED. REMOVE a BOTTOM @ 65.5 6flOr 1_7�_��7�1_ AND REPLACE EXISTING "am METERS AND VAULTS. STOP"STR EET CB RIM 70.96 I . (� �CM P �NW) IE 68.9(6"PVC E) IE 69.0(4" PERF E) INSTALL 2" IDOMESTIC CB IM 70 05 CITY STD DETAIL IE 69.0(8"CP S) E7.6.1 -A, 43LF-2" SERVICE LINE 8LF-4" D.I.P. L_u INSTALL 1-4" CAP A W 2" THREADED HOLE FOR METER SERVICE CONNECTION. 1-6"DOUBLE DETECTOR CHECK ASSEMBLY PER CITY STD. E7.8 & E7.8.1 DO NOT KNOCK OUT DRAIN IN BOTTOM OF VAULT. Y :1�. PROVIDE A 2' WIDE BY U A 4' LONG x 23DEEP WASHED ROCK TRENCH FOR LID DRAIN. LM" 0- OIH E&T&TV SSMH RIM 73.18 IE 67.7(6"OP NW) IE 69.5(6"CP NW) ,��N ­4­ JE 66.6(8"CP E&S, CTR CHAN) R 41 4 J D RAILING - PROVIDE A 2' WIDE BY 0 4' LONG x 2'DEEP WASHED 4,� Y J DI 72.60 FINISH FLOOR; ROCK TRENCH FOR LID DRAIN. 10 R L GRAS 4 CUT IN CONNECTION 7 1-8"x 6" TEE, FL K 4 .1­8" GATE VALVE, FJTWJ w FDC 1-6" GATE VALVE, FLxM 1-8" ADAPTO DD 11� 1 1 C 23LF-6" D.I.P. G ASS GRASS EXISTING x S,89-4b Ub'\W �!Dlq 79' "STOP" A 11-8" SLEEVE PIV VVV0VV ' -7-/ . ') u FIRE HYDRANT -8" NIPPLE S 16" DEiC UE A A �4 A P -1v /H I &TV 1-CONC. BLO I H T&TV -tip I -QLH -T&TV a lj� 4- d SDMH IZ RIM 65.96 IE 61.3(10"CP S) m RIM 75.26 IE 61.2(10"CP NW 8" D.I. W _8" D.I. 1 8" n I w IE 74.3(8"IP W) 1�j XIS"Ifll G FIRE YD ANT S89*46'05" .6815.71' 1 'SS > SSMH 0, F 1�3 RIM 76.28 < I-_ ===�> 0 1 �URFAC�-KrONUMJENT Lu JE 65.3(8"CP CHAN N) ALE STR T 9�1 IE 65.2(10"CP CHAN W) C14 J3R;6rST DISK WrPUNC IE 66.0(8"PVC TO ELBOW S) - - - - - - - - - - - - - - _"X GAS(R) 0 IE IE 67.4(8"PVC CAPPED) 68.6(8-IP SE) O/H E G_ A+- E- I/H F&T 1 -0 H E&T&TV u,, ri r- 4 ":A A. A 4 7 77 "STOP" A S Op" 1 1, 4 BENCHMARK "B" 11 ALEY/6TH AVI)' KAW czr)kAw LCI SDMH ELEVATION 69.59' CI SDMH CI RIM 66.09 RIM 65.14 RIM 64.95 RIM 65.60 RIM 69.06 RIM 74.91 RIM 76.10 -CP N) RIM 75.69 IE 55.2(10"CP E) IE 61.7(12-CMP E) IE 64.0(6"IP W) IE 64.7(6"IP W) IE 63.1(12"CMP W) JE 73J(15"PVC N) IE 72.1(12 IE 74.3(8"PVC NW) IE 55.1(12"CP W) IE 61.5(10"CP N) HE 64,0(12"CP E) BOTTOM 9 72.8 HE 71.8(12-CP W) HE 74.6(4-"PVC E) IE 55.5(6"CP NE) IE 62.1(6-CP NE) IE 63.2(8"CP S) IE 72.2(12 CP S) BOTTOM @ 73.5 BOTTOM @ 58.9 BOTTOM @ 61.6 HE 72.5(8-CP E) HE 72.7(6"CP NE) HE 72.4(6-CP SW) 2 GRAPHIC SCALE t Man-wff aninsonow BEEN]= ( Elf FM I iuch = 20 ft- LEGEND PROPOSED CONTOUR -65 EXISTING CONTOUR RIDGE LINE ---- R----- EXIST. SPOT GRADE NEW AC PAVING PROP. CB TY 11 W/ GRATE PROP. CB TY 11 W/ LID PROP. CB TY I W GRATE EXIST. CI3 TY I EXIST CB TY 11 AC PAMN�G FLOW DIREC11ON DETAIL REFERENCE DETAIL REF. # ��. �4 REF. SHEET # MRIIIIIIII=Imw mmmmm 111111311111111 mmmmmm I CDCWff BIM= SWILL X OW IN nAM 40 IAVE A XDM a V4 SDIVE I= BEARDS AGW TIE FITIDS RM D&L BM AWW MDO DLY AO MU ME VXAR IF 5, OMPAM SALL DIST&L MODMIG AMKATE M VMUAND FULL. TIM K=URE AS VELL AS TO 0"MISLY WMUW WMTDUL pmw Ww N.L Mam IF SRVIM RMX MY BE REIIM WITH USE IF MMM JM AMW N.J. "D - S C: I T- -Y- M .0 STANDARD DETAIL CONCRETE THRUST BLOCKING 7/24/01 1 3= um mm E7.9 1/4' RAKE PER FOUT FROM GROUND LEVEL STORZ ADAPTER z TRAFFIC SAFETY FEATURE. - BREAK 13FF FLANGE, NUTS-\ AND BOLTS. CP =71 /-SMEWALK BASE C13LRSE 3' x 3' x 3.5' THICee�'� USTABLE C13NCRETE PAD AROUND HYDRANT WEDGE VALVEI VALVE r RESTRAINED JOINTS TEE WITH FLANGED / OR TIE R13DS /_� C13NNECTMN FEIR 0 111 A 10 - LIN Is HYDRANT VALVE - F E" fNNECTION IZ,,,, LUNMST_U`RB­ED­E­A­fZTH ZHY.ANLT CO=C. PIPE TO CY WASHED �V,r KINU ROCK BE DUCTILE MON CLASS 52. ANY WITH FABRIC CLM14 ABOVE INTERMEDIATE JOINTS T13 BE RESTRAINED T14RUST BL13CK N 0 T E S , L HYDRANTS AND ALL MATERIALS TO BE IN ACC13RDANCE WITH CITY OF EDMONDS APPROVED MATEIZIAL LISTINGS. HYDRANTS SET IN CDNCRJ�IE REQUIRES AN EXPANSION STRIP AROUND HYDRANT BARREL. IN A=TION, THE INSTALLATION [IF THE HYDRANT 13N PRIVATE PROPERTY SHALL EQUAL 13R EXCEED STANDARDS SET F13RTH FOR THE INSTALLATION 13F PUBLIC FIRE HYDRANTS IN THE CITY 13F EDMONDS. 3. PROVIDE F13R VEHICULAR TRAFFIC PROTECTION. 4. ALL HYBRANTS SHALL BE PROVIDED VrTI4 (2) Z­L/r HOSE NOZZLES AND (1) 4-1/2' 14ST PUMPER NOZZLE WrTH 4' STURZ QUICK COUPLING ADAPTER 5 STEAMER PERT SHALL FACE THE STREET 13R ROADWAY FOR FIRE ENGINE ACCESS. 6. THREE FOUT MINIMUM CLEARANCE SHALL BE MAINTAINED AROUND HYDRANT WHEN PLACING LANDSCAPING OR ROCKERIES (ETC). 7. FIRE HYDRANTS SHALL BE PAINTED SAFETY YELL13V e. C13NSTRUCT 3' X 3' X 35' THICK C13NCRETE PAD AR13UND HYDRANT PIPE- F_ STANDARD DE7TAIL A GEBERT 6A6/03 FIRE HYDRANT ASSEMBLY 7/24/01 = hil.1 REVISED 4/1/03 APPROVED FOR o7FrFnqineer Date A 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 98104 206.682.3460 FAX 343.9388 EDMONDS CENTER FOR THE ARTS /0 RES 112/01/474�� PERMIT REVISIONS 4 APRIL 2005 1 J U LY 2005 R 0z r-, JUI 20 '005 SUILMIG DEPARTMENT CITY OF EDIVIONDS REVISIONS NO DAIE By DESaWM 1 .04/13/05 WPG/13DC PER CITY 1ST REVr-:'.k* 2 07/01/05 KMC/'BDC PER CITY 2ND 7/1/05 WPG/BDC PERMIT REVISIONS 'nTLE UTILITY PLAN DESIGNED w DRAWN KLT CHECKED BDC DATE 10/10/03 CADD FILE U: \LDD\2003019\DWG\XE-GRD.dwg JW NUMBER 2003019 C23 UAIdd\200301 D.dwg, UTL-C2.3, 07/18/2005 10:15:25 AM RM nANGE Ot DKIM SUE PPE b RN FLMGE A c c Eg-FLANGE A CAPP9 CROSS CROSS TEE VRLUG b b C -4 b TEE CAP 90, Ku b d d D D 4 BEO 22-1/2'KH B-1/4' BEND ww THRUST ECK TABLE t BE&qX 4wA w c3cRM MW UM EM MD P2 P=URE AM ML BEAM AW AGMT =M� WE ML BEAME I= IT um Pam PER Sam W. P AWAS mW w ADMTEB FUR UM UE SM, POMMS, 40 SmL QuaTm DATE 10/10/03 CADD FILE U: \LDD\2003019\DWG\XE-GRD.dwg JW NUMBER 2003019 C23 UAIdd\200301 D.dwg, UTL-C2.3, 07/18/2005 10:15:25 AM RM nANGE Ot DKIM SUE PPE b RN FLMGE A c c Eg-FLANGE A CAPP9 CROSS CROSS TEE VRLUG b b C -4 b TEE CAP 90, Ku b d d D D 4 BEO 22-1/2'KH B-1/4' BEND ww THRUST ECK TABLE t BE&qX 4wA w c3cRM MW UM EM MD P2 P=URE AM ML BEAM AW AGMT =M� WE ML BEAME I= IT um Pam PER Sam W. P AWAS mW w ADMTEB FUR UM UE SM, POMMS, 40 SmL QuaTm 75 7C 6 5 DATUM ELEV 50.00 58 56 54 52 50 48 46 44 42 40 38 PROPOSED GRADE _j -EXIST. GROUND 6"ROO:* 0 DRAIN 1 VROOF DRAIN-/ ------- 129LF - 8" P�C 3034 SDR 35 138LF 6" PVC 3034- SDR 35 RECHANNEL @ 1.10% MANHOLE @ 1.38% L0 co 10 (0 to 4 (0 P_ L6 to o6 0) 0i C� C� C14 to to 10+00 10+50 STC 2400 Precast Concrete Stormceptor (2400 US Gallon Capacity) (Disc Design) STORMCEPTOR COVER AND GRATE 32."0 GRADE ADJUSTERS TO 5" SUIT TINISHED GRADE 8" 3 C STEPS 7" 0 VARIES SEE NOTE #3 A4 1, 30" )M I [E-T INLET OUT:� - IE=53.25 T 8t' 18" 21 44' 15" 24" �_8"O DROP PIPE 60" WITH TEE 96"0 10 "A ;.:: SECTION THRU CHAMBER NOTE 1. FLEXIBLE CONNECTIONS ARE RECOMMENDED AT THE INLET AND OUTLET WHERE APPLICABLE. 2. COVER TO BE POSITIONED OVER OUTLET AND VENT PIPE 3. THIS IS A GENERAL ARRANGEMENT DRAWING. CONSULT LOCAL REPRESENTATIVE FOR SPECIAL CONDITIONS. 4. INLET DROP PIPE WILL BE EITHER 8'0 OR 12'0 WITH A 8"0 ORIFICE PLATE 5. ALL CONCRETE JOINTS HAVE RUBBER GASKETS THAT CONFORM TO ASTM C 443 6. U.S. PATENT NO. 4.985,148 ISEM PROFILE Sca1e:H=1'=20' V=1"=5' SEE NOTE #1 I v' 0 U T ELUT _RUBBEF GASKET PER ASTM C 443 (TYP.) 4 - t--- R I -OUTLET ENLARGED CONNECTION DETAIL 17 PLAN DESIGN SPECIFICATION 1. ASTM C 478 2. ME WEIGHT 12.82TONS STC-2400 REVISED 10/96 STORIVICEPTOR 2400 D I C2.2 U:\Idd\2003019\dwg\xe-GRD.dwg, PRO-C2.4, 08/31/2005 09: . COLD JOINT ATTACH CHANNEL W/,#3 REBAR HORIZONTAL q #4 REBAR 12- O.C. 31v b_LR #4 REBAR 12" O.C. F-4 WOKCM GRATE MUST BE RATED FOR H20 LOADING 2 OVERFLOW ELEV. co 30 T3 PROVIDE DETENTION F471 & OIL SEPARAnON PER PLANS Z 75 70 65 55 OUTLET PIPE 12"0 INVERT ELEV. 46.00 R -TRICTOR PLATE WITH 1'�ESTRICTOR PLATE WITH 0 IC S I ORIFICE AS SPECIFIED. IC SI 5/8"0 FICE SIZE A STAND PIPE DETAIL MAX. W.S. 53.00 ELEV.=52.75 CRESTED WEIR D=12" L=03' P=6.75' H=0.25' SEE DETAIL RIGHT q L0 58 56 54 52 50 -NCHj AIN 48 46 44 42 40 38 58 56 54 52 50 AR _rt_j 46 44 42 40 38 - SEATWALL PEP, ARCH PLAN SHEET A420 DETAIL #6 !A . . 'a t . .. 4 - - A 3%11" PORT OPENING TH O H SEATWALL FINISH GRADE BEHIND SEATWALL - - - - - - - - - - - - - - - SLOPE BOTTOM 0.5% TO DRAIN .1. 44. 4 4 4.. BOTTOM OF THOUGH-PORT-�4-�-�4, A TO MATCH BOTTOM- GUTTER ELEVATION OF CONI. GROUT END AROUND PIPE AC PAVING 4 D2'� TRENCH DRAIN PSI CAST -IN -PLACE CONCRETE 6' O.C. MAX. ELEVATIO �>!:.A I WALL PER ARCH PLAN SHEET A420 'd - DETAIL #6 3%11 THROUGH -PORT GRADE AWAY FROM ..a * THROUGH-PORTS'AT 2% CONT. GUTTER UNTIL DAYLIGHT. PLACE SIDEWALK PER SOD AT THESE AREAS A CH'L PLANS SECTI �"D3'� SEATWALL W/ THROUGH -PORT UU I I ER C2.2 FIGURE 5.3A.E RECTANGULAR, SHARP-CRESTEDNVEIR SECTION NTS riser D PLAN NTS �Lt4c_RETE yLkULT CONSTRUC110N NOTES: 1, THE VAULT SHALL BE BIDDER DESIGN. THE STRUCTURAL DESIGN SHALL COMPLY WITH ALL CITY AND STATE CODES. SOILS AND HS-20 LOADS SHAH BE ACCOUNTED FOR. PLANS MUST BE DESIGNED AND STAMPED BY A REGISTERED PROFESSIONAL STRUCTURAL ENGINEER IN THE STATE OF WASHINGTON. APPLICATION AND APPROVAL FOR A SEPARATE BUILDING PERMIT MUST BE COMPLETED PRIOR TO CONSTRUCnON. AL REINFORCED CONCRETE MUST 2. MINIMUM 300OPSI STRUCTUR BE USED. ALL CONSTRUCTION JOINTS MUST BE PROVIDED WITH WATER STOPS. PRE -CAST VAULTS SHALL HAVE APPROVED RUBBER GASKET SYSTEM. 3. ALL METAL PARTS MUST BE CORROSION RESISTANT. STEEL PARTS MUST BE GALVANIZED AND ASPHALT COATED (TREATMENT ONE OR . BETTER). 4, VAULT ACCESS GRATE SHALL MEET HS-20 LOADS. 5. ALL PIPE CONNECTIONS TO VAULT, USE NON -POROUS, NON SHRINKING GROUT. SYSTEMS. THE VAULT 6. STORMWATER VAULTS SHALL BE DESIGN/BUILD TIALBOUYAN& SHALL BE DESIGNED TO ACOMMODATE POTEN EPORT) DUE TO GROUNDWATER LEVELS (REFER TO GEOTECHNICAL R OR INCLUDE WALL DRAINS WITH POSITIVE OUTFALL SLOPE TO TO RELIEVE BOUYANCY UPLIFT. 58 56 54 52 50 48 46 44 42 40 38 0 SLOPETO RAIN EXI�T/ORIGINAL GRADE A, 1x< Z, 6 0 0 61 C_' 1 4 ,A ROAD SURFACE �--1/2 DIAMErER OF LARGEST ROCK IN F BOTTOM COURSE OR 12". WHICHEVER I MIN 6"0 PERF RIGID U'R 42� GREATER DRAIN PIPE. SLOPE TO I . 6 DRAIN AND'CONNECT TO STORM DRAIN SYSTEM. SLOPIE PROVIDE CLEANOUTS. EQ EQ DISTANCE (D1>HEI (1-11) -0 J UNDISTURBED NATIVE SOIL OR COMPACTED CRUSHED ROCK, AS GENERAL NOTES: REQUIRED LOCATION OF ROCKERY ADJACENT SPECIAL INSPECTOR SHALL VERIFY ROCKERY HEIGHT, TO CITY R.O.W. SHALL BE LOCATED FOUNDATION MATERIAL, AND ROCK SIZE. A MINIMUM DISTANCE EQUAL TO THE APPROVED FOF HEIGHT OF THE ROCKERY 2. QUARRY SPAH S AND CRUSHED ROCK SHALL BE PLACED co UCTIO� DIRECTLY FROM TRUCK OR OTHER SUITABLE CONTAINER IN ORDER TO MAINTAIN CLEAN BACKFILL. 491ptlel4c 3. OPENINGS SHALL BE "CHINKED" WITH QUARRY SPALLS. ALL BE DESIGNED AND STAMPED BY A 4. ROCKERIES SH LICENSED PROFESSIONAL ENGINEER IF GREATER THAN 8 FEET IN HEIGHT OR IF VARYING FROM THESE STANDARDS, OR IF UCH AS THE CITY DETERMINES THAT SPECIAL CONDITIONS (S CRITICAL AREA OR MEADOWDALE EARTH SUBSIDENCE LANDSLIDE HAZARD AREA) ROCK SCHEDULE H EIGHT MINIMUM ROCK -SIZE (Hj) BASE TOP 2 FEET 2-MAN 2-MAN 4 FEET 3-MAN 2-MAN 6 FEET 4-MAN 2-MAN 8 FEET ___+2-MAN 5-MAN C�TY 0 F EDMONDS REVISIONS --- STANDARD D ETAI L APPROVED BY DATE ROCKERY DETAIL DATE SCALE DW`G NO. 0-1990 4/1/03 NTS E 8.9 D4 ), ROCKERY WALL �C2.2) 801 SECOND AVENUE SUITE 501 SEATU WASHINGTON 98104 206.68Z3460 FAX 343.9388 EDMONDS CENTER FOR THE ARTS OV WAS, /0NAL silo EXPIRM 12/17/-n65 I 0 0 1 z U) OC) 0) M 0) < �: LLJ z < ui U) V) Z Nt C\I 0� (0 0 0 LLJ LLJ I.- En C\j uj z < Ld C) w 0 Z Lj > LLJ < r 0 u 0) CD m 0 Cq BID SET 18 JULY 2005 ;RESUB AUG 312"., WL0jr4u DEPARTIVENT Ejulgomos REVISIONS NO DA1E BY DESCIWIN - - 1 04/13/05 WPG/BDC PER CITY 1ST REVIEW PERMIT REVISIONS 7/1/05 WPG/BDC 8/30/05 WPG/BDC CITY COMMENTS 'nuE UTILITY PROFILES AND DETAILS DEVGNED Aw DRAWN KLT CffCKED Jjw DATE 1011OL03 CADD FILE U: \LDD\2003019\DWG\XE-GRD.dwg JOB NUMBER 2003019 C2,4 RESUB AUG 3 12005 BUILDING DEPARTMENT CITY OF EDMONDS //p /? / "g, STREPT FILE I B EXISTING HYDRANI 77*-r A KRIMETER FRI ON MUSIC ----------------------------------------------- 144 1 13 CAND" OVER WALKWAY s or Im Tim wA LIMUCTMMT[Ctm muy ponam OPOM FIRE SEPARATION 067MCE MAXIMUM ALLOWED AMA 3170 v 15Z VTO 20' 75X GREATER THAN 20' NO LIMIT [I --------------- PAT ALIGN 0 IL 4- L) u") (714 m C4 I-- LLj LLJ I6 5 + 4 + b -b li, A3 C> J. 12'- 6 lA* 24'-0 106'-OL. TYP. NEW ASPHALT PARKING LOT ------- + TYP. PARKING WITH EXTRUDED CURBS TYP SPACE DIMENSIONS. REFER TO CIVIL FOR RtGRAbING 10 "ct CN R=2'-6" TYP. 7 6 6 R=121- 1 R=lq R=251-011 —4 Vx\� 7 2 6 6 (lD POST MOUNTED ALUMINUM SIGN. FIXED BOLLARD-TYP. SEE ll/A420 80 NEW PARKING SPACES PROVIDE PAINTED OR SELF RAMP DN 1:20 LOPE 2 PAD MOUNTED A- ADHESIVE VINYL FACING. SIGN PROVIDE CONIC. WHEELSTOPS TU­REAg..-- —.NOT ELECTRICAL TRANSFORMER W, XI ONLY AT SHOWN LOCATIONS— A2 61 It 81-611L, 1-911 511-0. 8'-6" 5'-Q',, DUMPSTER ENCLOSURE—\ 2 V OLO 17'-011 A mmm..r-ALIGN 42 \t2�O ACCESSIBLE ROUTE OF TRAV 2 4 6 3 lk c> C14 r --------- .011 12F R=l 1-0 2' . . . . . . . . . . ... % m.. af A. 71. 94/2 Lr) R=4'-O.l O.C. 2 ALIGN 2.71 EXST CONIC T.O.C. STAIRS R=5'-O" AGUISISISLE P KING SIGNS, TO REMAIN 7. TYP OF (4). WORK UNDER 0 ITI \ k�x I.- "�s SEPARATE CONTRACT. 2'- HIGH CONC. SEAT WALL , '.'ry CIP-4/F F.D. LOCK X 4 +\\68�.6�� T.O.S. 2 6 -011 R=400' 2 10 . . . . . . TO SEAT WALL ALONG BLDG N EXISTING MAIN BUILDING -7 --- ------------------ > 1 1 L t i ALIGN 5 CONC. PLAZA/WALK -0" SPACING TOOLED JOINTS PAVING PATTERN: 6' 7 NORTH -SOUTH LINES PARALLEL TO SEAT WALL EAST -WEST LINES PERPENDICULAR TO SEAT WALL oij 11 .7- ----------------- -------- . . . . . . . . . . . . . 8.67' EXIST LIGHT POLE T.O.S. —7-1 77 -I-L ASSUMED P"TY LINE BETWEEN III BUILDING AND ECA Tis MEET SC 704.3 RECIMENTS ECA BUIL)ING i illoo 201-011 ACCESSIBLE ROUTE- OF TRAVEL SETBACK L R=5'';O"l R-12'- BIKE RACK LOCATION,. PROVIDE RACK FOR MIN (2) BIKES 10 % 'It j iMl-011 -k-L V1 Q T INIP -.1—E)OSTWO DOOR f FIRST FLOOR C-) EXISTING W M I FIRST FLOOR. EXISTING INS WOW QV S.F.) IS -101 OF THS PORT01 OF THE WALL US S.FJ MUSIC BUILDING co MUSIC BUILDING SEE SHEET A302 FOR ELEVATIONS ENSI K w tltww ELEC POLE. TERMINA�E N!EW CONC. 11 CURB AND SIDEWALK d AT NORTH PROP. LINE. !l T R=15'-O" TYP. NEW CONC.�� CURB, SIDEWALK AND CURB CUl AS SHOWN AT 6TH AVE. EXIST EL�C,:POLE r EXISTING HYDRANT - — - — - — — — - — - — — - — - — - — - — - — - — - — - — - --- — - — - — - — - — - — - — - — - — - — - — - - - - - — - - - - ealenclo U'8 I oidd 048-001 Puc BIT cle co e 0 8A -- - 1 9 0 and to fion approyed b S JoUg ,,;ejgj-I3 �Oj 9 o GtOA09J o oloug - CURB 1RAM - ACCEStIBLE ROUTE OFI��TRAVE 6TH !A',.!F f Li D EXST ELEC POLE I Ar ENSTING TUW I SECOND FLOOR a............. p z:c IT I' t I LIGHT BOLLARDS. HIS WORK LIE OF FIRST FLOOR HMPP %ZI7P,&PATr rnKITPArT EXIlluum WALL m SEE ELEC FOR CONNECTION. LINE OF SECOND FLOOR EXTERIOR WALL - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - — - . . . . . . . . . . . . . . . . . . . . . . . . . . .. H. 47 masUSIC BUILDING SEPARATION -I., INDICATES EXST CURB INDICATES EXST TREE FXST FLEC POLE SCALE: Yro"al".0" 3 EXST ELEC POLE AND SIDEWALK, TYP. TO REMAIN, TYP. EXST ELEC POLE EXST HYDRANT I --------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ----------- j Zone ComerA-Elag, Rapired _Actual : GENERAL SITE NOTES 1. PROTECT AND PRESERVE EXISTING LANDSCAPING AND VEGETATION TO REMAIN. PROTECT ALL EXISTING TREES SHOWN TO REMAIN. 2. PROTECT ALL EXISTING EXTERIOR CONCRETE WALKS AND STEPS TO REMAIN. 3. REFER TO CIVIL FOR WATER, SEWER AND FIRE DEPT. CONNECTION LOCATIONS. APPROVED'BY PLANNING EXISTING HYDRANT LEGE-ND Ir 711, Now iI AII 'w tJft;'h E NO T rE rml T Erin E PERMIT REVISIONS 4 APRIL 2005 1 J U LY 2005 REGISTERED ARCHITECT STATE OF REVISIONS NO DATE BY DESCRIPTION A 4/4/05 REVISIONS A2 4/4/05 PERMIT REVISIONS 7/11/05 PERMIT REVISIONS im- -41= 0TY OF f6l:211 NO TITLE SITE PLAN a STREET FILE DESIGNED DRAWN D r 1,; DikTs li L=U—L I Vt SITE PLAN SCALE: Yj6"-l'-0" 0 8' 16' 32' 481 ------- PROPERTY LINE SETBACK05 EXISTING TO BE REMOVED (AS NOTED) PLOTTED: 7/13/2005 FILE: L:\Projects\eco\CAD\Sheet Files\o006.dgn CADD FILE JOB NUMBER d N.W. 1/4, SECTION 24, T.27N., R.H., W.M. )M NL) LL C) S UEN TEH FOR TH, L: ARTS C C4 SSMH RIM 70.40 ....... ...... IE 65.6(8"CP SE) IE 63.1(8"CP N&S, CTR CHAN) V) U) Y, Cf) PROVIDE CE3 PROTECTION PER CITY V) WALf STANDARD DETAIL E1.3 00 En 0 PINE ........ ...... -q�BENCHMARK "C" FLEVATION 72.47' 17-7 C. I. W V) CB 0 RIM 70.81 IE 69.6(6"CP W) VICINITY MAP NO SCALE Empol 196TH ST SW S.R. 524 Lovell-7Sauerland < & Associates, Inc. 2T-: I- Engine ers/Surveyors/Planners DO Development Consultants 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e-mail: info@lsaengineering.com Do web: Isaengineering.com �"No I j "I t��thing4 a,11,P Vapproval proeZ�gq dWl &e CY) or permitting the 0 allowin maintenance of any, currently Ppxistingillepl, nonconforming or ur,?erwittfAbvilding, struc-tt6- 0 (t-0,1te cQhdition which is oup*e t4q$cope of app ical the t of whether such _j g, str t r.con171-4 _j . I , is'sh6Wn o e nord b 11 in " n ition m ;ub�jj' ct 0;1! e e o a, se 'aratie en. ement to ')WG t -WtIVALK FORM INSPE0119W-AEQUISED E2.3- ACP AND UTILITY PATCH N. SCALE 1"=20' (n 1 10 0 30 TRENCH AND RESTORE PAVEMENT AND 0 > SIDEWALK PER CITY STANDARD DETAILS: T6� A A 0 0 �0 C NE IE 67.7(6"CP NW) (A IE 69.5(6"CP NW) 0 0 IE 66.6(8"CP E&S, CTR CHAN) 2" of 5/8' 4, 4" MIN. -1/4" C. ??? -SD-SD-SD-SD so )0 z *CONNECT Z) DOWN SPOUT r LL EL MI/ d z P D) 0 z < CO) (0 V) V) 1 6 7,Z(4 A IR @ Al'�/b A N 25' U T "Y Kl-- Do C N DOWN I OF D N T/LEIF V) X .8 RT .5 SPOU A _00 L IM 2. 1 9. 20�-6" PV' r) OVV9EFUCONTf1A0TO'R IS R-nPONSIBLE FOR'EROSION CONTROI�AND DAMAGE 11, cr .f,,L in z- SEE E2.3 N BACKFILL MATERIAL (SEE NOTE BELOW) BEDDING MATERIAL (SEE NOTE BELOW) N 0 T E: A . , ./ 0 REFER TO CITY OF EDMONDS MODIFICATIONS TO W V) DIVISION 9 OF WSDOT SPECIFICATIONS FOR ROAD, BRIDGE & MUNICIPAL CONSTRUCTION S i I SDCO #5 RIM 74 8 0 E C N�Z C DOWN/ IE 70. 17 FTABLE 1: MAX. TRENCH PATCH PAY WIDTIA AP 9_1JT SP T .. ...... ...... ..... TRENCH DEPTH PAY WIDTH -4 1 40" 4 -10' 35 60' .:­: 10'-20' 72" SD 0 0 V) V: V 01 T SD y y T T T Y T . . ....... (n REVISIONS STANDARD DETAIL SDMH A �PROVED BY DATE b.s. RIM 65.96 A GEBERT 10/6/03 IE 61.3(10"CP S) SDCO #7-/ \_95-6" PVC qnrn CI A GEBERT 07/213/05 TYPICAL TRENCH SECTION IE 61.2(10"CP NW___---- (A RIM 72.8 #6 - DATE SCALE OWG NO. 0 8" D.I. V.- 70-W - B" D. 1. W 01.0% RIM 73.8 RIM 75.26 890-1990 13. GEBERT 04/02/07 7/24/01 NTS E4.2 I E----M 5 iE 74.3(8"IP W) L U) X 8" D. 1. W S89*46 05 VV 685.71 -S ss__S� IS -SS -SS -SS L 4 " ;:1 - I SSMH RIM 66.09 IE 55.2(10"CP E) IE 55.1(12"CP W) IE 55.5(6"CP NE) SDMH RIM 65.14 IE 61.7(12"CMP E) IE 61.5(10"CP N) JE 62.1(6"CP NE) BOTTOM @ 58.9 DALEYI:STREET I 12" SD _���-ii�713ENCHMARK "B" CI SDMH ELEVATION 69.59' RIM 64.95 RIM 65.60 RIM 69.06 IE 64.0(6"IP W) IE 64.7(6"IP W) IE 63.1(12"CMP. W) IE 64.0(12"CP E) IE 63.2(8"CP S) BOTTOM @ 61.6 i 6,rss���� - 12" SD C14 1::� 3: 9 ]TAFRE 11� En 00 SDMH RIM 76.10 IE 72.1 (1 0"CP N) IE 71.8(12"CP W) IE 72.2(12"CP S) IE 72.5(8"CP E) IE 72.7(6"CP NE) IE 72.4(6"CP SW) MONUMENTrY- SSMH RIM -, IE 65 �2 z 0 a_ > 0 W Ld 0 0 < _j CN v) < < LLJ 0 CD < - 0 LLJ < Q Q Q) Q 12-1-oq ,� z 6.28 .3(8"CP CHAN N) IE 65.2(10"CP CHAN W) BOUNDARY AND TOPOGRAPHY FROM RWEWED IE 66 0(8"P EI=E3QW 9) IE 67'4(8" C CAPPED) "TOPOGRAPHIC SURVEY", PREPARED B IE 68.6 "IP S BUSH, ROED & HITCHINGS, INC., DATED )EC 11 S49 3-28-03 (REVISED 9-25-03). ",-DEVI LOPMENT SIRVIC 1 =20' sclm�� APP" MuVED AS NOTED BY' EN.GINEERIN CI RIM 75.69 Date: 1121 ui?" a 0 DRAWN RLL CHECKED RLL SHEET IE 74.3(8"PVC NW) IE 74.6(4"PVC E) DATE C 1 F.B. BOTTOM @ 73.5 Call 2 Working Days Before You Dig 10-14-09 IqR EET FILE PFN 1-800-424-5555 FILE NO 5193 Utilities Underground Location Center LSA I (lD,MT,ND,0R,WA) OF J -1 - - - - - - - - - - - - - - - - - - - - - - --- GLEN STREET z IC ,-"NO PARKING" SIGNAGE WILL BE REQUIRED FOR CLOSURE OF' STREET PARKING I DALEY STREET ------ ------ 0 r -1 SPRAGUE STREET ----------- CLOSING HALF THE ROAD NTH FLAGGER NO SCALE KI \A/ 1 1A_ qP-r.TIONI 94- T 97NI P _-� F V KA -TRAFFIC CONTROL PLAN NOTES 1. ALL FLAGGERS ARE TO BE EQUIPPED NTH ORANGE SAFETY VESTS AND HEAD GEAR - APPROPRIATE FOR FLAGGING TRAFFIC WITHIN THE PUBLIC RIGHT-OF-WAY AND SHALL HAVE VALID FLAGGING CARDS FROM THE DEPARTMENT OF LABOR AND INDUSTRIES. 2. AFTER WORK WITHIN THE TRAVELED ROADWAY IS COMPLETED AT THE END OF EACH DAY, THE ROAD SHALL BE COMPLETELY OPEN TO TRAFFIC AND ALL EQUIPMENT SHALL BE OUT OF THE TRAVELED ROADWAY. ANY EQUIPMENT OR CONSTRUCTION MATERIALS LEFT WITHIN THE PUBLIC RIGHT-OF-WAY SHALL HAVE LIGHTED TYPE 11 BARRICADES AROUND THEM. ALL NONAPPLICABLE SIGNS SHALL BE REMOVED, TURNED OR COVERED DAILY WHEN CONDITION NO LONGER EXISTS. 3. ACCESS BY EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES. 4. CONSTRUCTION SIGNS AND DELINEATORS SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR. 5. TRAFFIC CONTROL PLAN IS SUBJECT TO CHANGE PRIOR TO CONSTRUCTION. 6. ADD11IONAL SIGNING AND FLAGGING MAY BE REQUIRED AS CONDITIONS WARRANT. 7. SHOULD A PROPOSED SIGN LOCATION FALL WITHIN A PRIVATE DRIVEWAY, CONTRACTOR TO ADJUST LOCATION OF SIGN TO FALL 5'+ BEYOND EDGE OF DRIVEWAY IN DIREC11ON OF ROAD TRAFFIC. (10' MAX. FROM PLAN LOCATION) DRIVEWAY ACCESS SHALL BE MAINTAINED AT ALL TIMES. 8. ALL TRAFFIC CONTROL SHALL COMPLY WITH MUTCD STANDARDS (I.E. FIGURE 6-5). 9. ONE FLAGGER MAY BE USED IF THE ENTIRE WORK AREA IS VISIBLE FROM ONE ,;TATION. 10. EN11RE CLOSURES OF 6TH AVENUE N. WILL NOT BE PERMITTED, ONLY ONE LANE MAY BE CLOSED AT A TIME. 11. CLOSURE OF THE SIDEWALK AND PARKING AREAS FOR MORE THAN 72 HOURS VALL REQUIRE PAYMENT OF DISRUPTION FEES. S LTR MUTCD SIGN TYPE A W20-1 ROAD CONSTRUCTION AHEAD B W20-4 ONE LANE ROAD C W20-7A FLAGGER SYMBOL D G20-2 END CONSTRUCTION E N/A FLAGGER NOTE: ALL CONSTRUCTION SIGNS AND FLAGGERS ARE TO BE PROVIDED BY CONTRACTOR. TRAFFIC CONTROL SIGN SCHEDULE APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: 1-411-069 BY. _��r-qylrck CITY ENGINEERIN(l D1\(%St0f1J <) DA� WAL PIN LO %0, %ACINITY MAP NO SCALE L I 196TH ST swl S.R. 524 Lovell— Sauerland < & Associates, Inc. F= Engineers/Surveyors/Planners co 00 Development Consultants 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e—mail: info@lsaengineering.com co web: Isaengineering.com W z I . In _j 0 ry Z < 0 n 0 Z� Q Ltj to-14- Ljj ry 0 < V) 0 0 C) LIJ (of) Ld 'OCT 14 2-009 SCALE 1 to =20' DRAWN CHECKED SHEET RCN RLL DATE F.B. TC1 10-14-09 Call 2 Working Days Before You Dig PFN 1-800-424-5555 Utilities Underground Location Center LSA FILE NO. 5193 OF (lD,MT,ND,0R,WA) 1 . RESTORE EXISTIWz TURF TO REMAIN FE7EC. 4TH AVE. 4 �+ + T T T T 0 0 0 �0)1 T T DALEY ST. NELIJ TURI-- t4SW TUF�-- GLEN ST. PLA14T SCHEDULE BOTANICAL NAME/ SYMBOL COMMONNAME Fraxinus pennsylvanica'Summit/ Summit Ash DECIDUOUS TREES 0 Tilia cordata'Greenspire7 Greenspire Linden Ginkgo biloba 'Princeton Sentry/ 2-1 Columnar Maidenhair Tree cal. CONIFEROUS TREES Calocedrus decurrensf 81 Incense Cedar ht. Chamaecyparis nootk,atensis'Pendula7 81 Alaska Cedar ht Thuja plicata/ 81 Western Red Cedar ht. LARGE EVERGREEN SHRUBS Osmaria Y burkwoodii/ 3011 Burkwood Osmanthus ht. 0 30" A Rhododendron augustinii/ Rhododendron ht. Rhododendron 'Boule de Neige/ 30-1 Rhododendron ht. Viburnum tinus'Robustum7 30" Roundleaf Laurestinus ht. MEDIUM EVERGREEN SHRUBS Sarcococca ruscifolia/ Fragrant Sarcococca ht. Pieris japonica 'Variegata7 1811 Variegated Lily -of -the -Valley Shrub ht. Rhododendron yak. 'Mist maiden'/ 181, Rhododendron ht. Viburnum tinus'Spring Bouquet/ 181, Spring Bouquet Laurestinus, ht. Rhododendron 'Jean Marie de Montague7 181, Rhododendron ht. SMALL EVERGREEN SHRUBS Kalmia latifolia 'Tiddley Winks7 12" Tiddley Winks Mountain Laurel ht. Rhododendron 'Snow Lady/ 12" Rhododendron ht. Ilex: x'Mondo7 12" Little.Rascal Holly ht. Rhaphi olepsis umbellata'Minor/ 12" Dwarf Gulf Green Rhaphiolepsis ht. Rhododendron 'Elizabeth Red Foliage7 12" Rhododendron ht. Viburnum davidii/ 1Z, David's Viburnum ht. LARGE DECIDUOUS SHRUBS Comus mas/ 36" Comelian Cherry ht. Viburnum bondnantense'Pink Dawn/ 36' Pink Dawn Viburnum ht. MEDIUM DECIDUOUS SHRUBS Rhododendron 'Narcissiflora7 18.1 Ghent Hybrid Azalea ht. Rhododendron 'Strawberry Ice7 181. Knapp Hill-Exbury Hybrid Azalea ht. SMALL DECIDUOUS SHRUBS Fathergilla gardenii/ 1Z, Dwarf Fothergilla ht. GROUND COVERS Pachysandra terminalisl 4-1 Japanese Spurge pot Cotoneaster dammed 'Streibs Findling7 41 Streibs Findling Cotoneaster pot NO SYMBOL Hosta sieboldiana 'Francis Williams'/ 1 Golden Circles Hosta gal. Blechnu-m spicaritt 1 NO SYMBOL Deer Fern gal. NO SYMBOL Hermerocallis 'Stella d'Ord/ 1 Stella d' Oro Daylily gal. Se eded Turf NA Restore Existing Turf NA EXISTING.TREES Existing tree to remain NA PLAINT SCHEDULE 1. Seed to limits of disturbance if existing turf is disturbed by construction, install new turf per specifications. 2. All plant material shall be in accordance with the plant schedule and specification. 3. Verify location of all underground utilities before beginning work. Notify Landscape Architect of any conflicts. 4. Preserve and protect all existing plants and turf to remain. 5. See sheet Ll 02 for irrigation plan. Provide adequate water to all newly planted areas per specification. 6. See sheet L103 for planting and irrigation details 7. All trees shall be a part of alternative #8. See specification section 01230.1.03.9. QUANTITY REMARKS LIMINARCHIT 801 SECOND AVENUE SUITE 501 SEATU WASHINGTON 98104 1 Per Edmonds Street Tree Plan. B&B, symmetrical, 206.682-3460 FAX 343.9388 branched to 7 feet 100fth, left& r..A ff % M(D1cL,,,Ud 15 Per Edmonds Street Tree r% Plan. B&B, symmetrical, Is e C ktr )"I m d matched specimens, branched to 7 feet Landscape Architects B&B, symmetrical, branched 231 Surp.mit Ave East to 4 feet minimum Seaftle. Washinaton 98102 1 B&B, specimen quality, symmetrical, full to base 1 B&B, specimen quality, symmetrical, full to base 3 B&B, specimen quality, symmetrical, full to base . 0 14 B&B or cont., full form, 5 feet o.c. max. 12 B&B or cont., full form, 5 feet o.c. max. 14 B&B or cont., full form, 5 feet o.c. max. 43 B&B or cont., full form, 5 feet o.c. max. , 7 B&B or cont., full form, 4 feet o.c. max. 8 B&B or cont., full form, 4 feet o.c. max. 10 B&B or cont., full form, 4 feet o.c. max. 39 B&B or cont., full form, 4 feet o.c. max. 18 B&B or cont., full form, 4 feet o.c. max. 11 B&B or cont., full form, 3 feet o.c. max. 11 B&B or cont., full form, 3 feet o.c. max. 57 B&B or cont., full form, 3 feet o.c. max. 13 B&B or cont., full form, 3 feet o.c. max. 7 B&B or cont., full form, 3 feet o.c. max. 10 B&B or cont., full form, 3 feet o.c. max. 4 B&B or cont., full form, 5 feet o.c. max. 5 B&B or cont., full form, 5 feet o.c. max. 8 B&B or cont., full form, 4 feet o.c. max. 9 B&B or cont., full form, 4 feet o.c. max. 14 B&B or cont., full form, 3 feet o.c. max. 709 Well rooted, full healthy plants, 12'from edge of bed, 18" o.c., triangular spacing 2212 Well rooted, full healthy plants, IZ'from edge of bed, 18" o.c., triangular spacing 18 Well rooted, full healthy plants, Locate as directed 18 Well rooted, full healthy plants, Locate as directed 30 Well rooted, full healthy plants, Locate as directed 2548 SF See specifications Section 02900 12793 SF See specifications Section 02900 NA Preserve and protect APPROVED BY PLANNING STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT E WARD MACLEOD �:9� CER71FICATE No. 191 REVISONS No DATE By 813MIM A 4/4/05 REVISION PLANTING PLAN DESIMM LP DRAIRW MBM/MIDPOINT of= EM DATE 10 OCT 2003 CADD FILE 03110-PI-Pin.dwq EY NUMBER 03110 0 W 2C 60' CITY [15 TIVIENT NDS 0 1 IRRIGATION NOTES sift 11JA11-- 909N11,1111 I w %-0 1 %.0 1 \ %.# \a W r- I.L.F\v I I r - . PROVIDE 5 SPARE WIRES FROM CONTROLLER TO THIS POINT DALEY ST. 11/4" 11/4" 11/4" 11/4" �61 GATION Irin CIVIL DrETAIL VIDE 5 Ri -: V\/I RES M TROLLER 'F IS POINT AVE. 1. PROVIDE SPARE WIRES AT ENDS OF MAINLINES AND TO PREVIOUS WORK AS INDICATED ON PLANS. LOOP SPARES THROUGH EACH INTERMEDIAT VAULT. LABEL ALL WIRES AS THEY PASS THROUGH EACH VAULT. 2. STAKE ALL VALVE BOX LOCATIONS FOR APPROVAL. PLAN IS DIAGRAMMATIC. 3. SET VALVE BOXES SQUARE TO ADJACENT BUILDING, CURB, OR PAVING. 4. ALL IRRIGATION UNDER BUILDINGS, ROADS, WALKS, PARKING AREAS OR OTHER PAVED SURFACES SHALL BE SLEEVED. SLEEVES SHALL BE 1-1/2 TIMES THE DIAMETER OF THE INSERT PIPE, 6" MIN, OR AS INDICATED. SLEEVING MAY BE INCLUDED FOR FUTURE WORK. 5. ALL PIPE SHOWN UNDER PAVING ADJACENT AND PARALLEL TO PLANTED AREAS IS INTENDED TO BE PLACED IN THAT AREA WHERE POSSIBLE. ALL MATERIAL TO BE INSTALLED ON OWNERS PROPERTY. 6. MAKE ANY AND ALL REQU;RED ADJUSTMENTS TO THE IRRIGATION PLAN TO ASSUR, E COMPLETE AND ADEQUATE COVERAGE WITH MINIMUM 6VERSPRAY. 7. SEE PROJECT MANUAL FOR FURTHER INFORMATION. 8. PLACE TRACE WIRE ON ALL IRRIGATION PIPING AS SPECIFIED 9. LATERAL LINE SHALL HAVE 18" OF COVER, AND MAIN LINES 24". 30" MAXIMUM COVER. 10. REFER TO PLANTING PLAN FOR EXACT LAYOUT. INTENT IS THAT ALL NEW PLANTINGS RECEIVE ADEQUATE WATER. GLEN ST. 11. VERIFY STATIC PRESSURE OF 110 PSI AT COMMENCMENT OF CONTRACT. SUBMIT WRITTEN REPORT TO LANDSCAPE ARCHITECT PRIOR TO BEGINNING WORK. EQUIPMENT LEGEND SYMBOL DESCRIPTION P.S.I. RADIUS 0 TREE BUBBLER - SEE DETAIL - EACH SYMBOL REPRESENTS 2 HEADS 30 - C� 'Cl A= q 4D 0 RAINBIRD 1812-SAM-PRS &SERIES NOZZLE 30 81 m z a, a� 4D 0 RAINBIRD 1812-SAM-PRS 10'SERIES NOZZLE 30 10, ck Q 'z zo 4D 0 RAINBIRD 1812-SAM-PRS 12'SERIES N077LE 30 12' Is 0 RAINBIRD 1812-SAM-PRS 15'SERIES NOZZLE 30 15' USE RAINBIRD PCS SCREENS TO (-,ONTROL OVERSPRAY HUNTER 1-20-ADS SS PART CIRCLE ROTOR Q=2, T=3, H=4.0, TT=6 60 40' HUNTER 1-20-369-8.0 FULL CIRCLE STAINLESS STEEL ROTOR 60 40' AUTOMATIC CONTROL VALVE, SIZE'.AND PRESSURE REGULATING OPTION PER VALVE KEY QUICK COUPLER VALVE - RAINBI RD, 44LRC AS DETAILED FC-1 CONTROLLER - CONNECT TO EXISTING BY OTHERS USING PROVIDED WIRES AS NOTED POINT OF CONNECTION - RESILIENT WEDGE TYPE STOP SCHEDULE 40 PVC LATERAL PIPE - SIZE AS INDICATED 3" SCHEDULE 40 MAIN LINE SCHEDULE 40 PVC SLEEVE - 6" SIZE UNLESS OTHERWISE INDICATED NOTSHOWN # 14 AWS TYPE UF CONTROL WI RE, RED = SIGNAL, WHITE = COMMON, YELLOW= SPARE USE RAINBIRD 1800-SAM-PRS 4" POP-UP HEADS IN TURF AREAS, AND 1812-SAM-PRS 12" POP-UP HEADS IN ALL SHRUB AND GROUND COVER AREAS. VALVE KEY cn 0 0- m cb a. ill 20 30 YES 2 1-1/2" 56 30 YES 3 1-1/211 52 30 YES 4 1-1/2" 42 5 if$ 30 30 J�YES 6 1-1/2" 46 60 NO 7 ill 20 30 Y E S 8 lll�_ 18 30 YES 9 if? 40 60 NO 10 111 34 60 NO 11 ill 31 60 NO 12 lit 17 30 YES .V-V�efore Vol L 1-800-424-5555 0 16 20' 46' 66' 801 SECOND AVENUE SUITE 501 SEATTLE WASIINGTON 98104 206.682.3460 FAX 3419388 R iu III up j ; V1111 CENTER FOR THE Amirn r% 10 STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT E(WARD MACLEOD CERTIFICATE No. 191 PERMAIT REVISION'S 4 APRIL 2005 REMSIONS NO WE BY =PTION A 4/4/05 RE\4SION TITLE IRRIGATION PLAN DESIGNED Lp DRAV4 ws CHECKED EM DATE 10 OCT 2003 CADD RLE EdmmdsiRR—Pln.dwq JOB NUMBER 03110 A Ammm. Apq&, RE! UB'm ff ILK's 2L a v III R;e APR 05 1 %J BUILDING DEPARTMENT CITY OF EDMONDS 5ACKPLOW NOTES: 1. DO NOT ALLOW VAULT TO REST ON PIPE. 2. ALL FITTINGS TO BE SAME SIZE AS 5AC<FLOW PREVENTER. 3. ALL SCHEDULE 50 PVC PIPE AND FITTINGS FROM METER ASSEMBLY TO DCV. 4. SEE SPECIFICATIONS FOR GATE VALVE VAULT. SCH. 50 PVC NIPPLE, 49 5. PROVIDE TRACE WIPE AS SPECIFIED z LENGTH, TYP. SCH. 60 PVC UNION, TYP. PVC EL50W , 4" CPP TO C5 3" BALL VALVE ST00Q 0 0,z� 00 0% 0. Z� % 0 01�)b 0 L DOUBLE CHECK VALVE ASSEMBLY N.T.S. CONTROL VALVE NOTES., 1. DO NOT ALLOW VAULT TO REST ON PIPE. 2. ALL PIPE AND FITTINGS WITPIN VAULT TO BE BCH 80 PVC SAME SIZE AS CONTROL VALVE. 3.ALL BOLT COVERS TO BE LOCKING TYPE, BOLT INSTALLED. 4. INSTALL PRESSURE REr-zULATING OPTION FER TPE VALVE <E'r. ]all HIN. 24" MIN. I I I --,, N-- ScH 80 Pvc lllk�_ ST BUSHING LATERAL LINE TRACE WIRE AS SPECIFIE CONTROL VALVE N.T.S. I � /__ , FLUSH WITH FINISH GRADE DOUBLE CHECK VALVE 2" FE5CO 65OU TWO (2) NDS MODEL 2245C5 1"71 X 301 X 15' HT VAULTS WITH 'T' TYPE LID.S. BOLT VAULTS TOGETHER, INSTALL LID IN 50TTOM VAULT. PVC TEE W1 PLUG, TYP. TIE OFF TRACE WIRE 41, SCP ao F>VC NlP`PLE, TYP. TEE W1 PLUG, TYP. 3" MAINLINE TO FLOW SENSOR AND CONTROL VALVES C14ANGE FROM 5CP. 50 PVC TO 5CP. 40 PVC `PIPE. NO FEMALE ADAPTERS. 121, MIN. WASHED DRAIN ROCK PER .SPECS., 46 DEPTI4 THROUGHOUT AUTOMATIC CONTROL VALVE SEE SPECIFICATIONS 5CH ao PVC UNION, TYPICAL PLASTIC BALL VALVE SAME SIZE AS CONTROL VALVE VAULT FLUSH W1 FINISH GRADE /4"1 C EAR CARSON STANDARD VALVE BOX I" OR 1-1/4" VALvr=S . CARSON JUM50 VALVE BOX 1-1/2" OR 2" VALVES V Al ILT TO EXTEND MIN. BELOW U VALVE. USE EXTENSIONS AS NECESSARY. SCH e0 PVC NIPPLE, TYP. c9o�) LENGTH AS REQUIRED SCH 80 FVC ST 51.15�41NCz SCH 40 PVC. SO SCH 40 PVC MAIN LINE 9--a—SPRAY OR BU55LE 'NOZZLE FLUSH W1 FIN15H GRArpE RAIN51RD IaOO SER16 HEAD NOZZLE 4 BODY PER PLAN USE 50TTOM INLET Ct,!LY SCH 40 PVC NIPPL'r-", LENGTH AS NECESSARY LASNEC IV' MIN. TRACE WIRE AS SFECIFIED C PRE-MANUFACTUR�D SWING .,4 JOINT AS SPECIFIE0 1 P 40 FI; TING5, TYP. PVC CL5200 PVC, LA� RAL, TYP. SIZE AS INDICATELD ON PLAN POP—UP SPRAY HEAD N.T.S. -1 �4 11 a^— doNi I A 1== TURF ROTOR N.T.S. FLUSH WITH FINISH GRADE GRADES TO BE FLUSH AND SMOOTH AROUND HEADS 2' X 2' SOD, PER SPECS. IRRIGATION HEAD PVC SCHEEL") 60 RISER PVC SCPED 40 ST ELL 4 TT SO DEG. ELL PRE -MANUFACTURED SWING JOINT AS SPECIFIED LATERAL LINE 4 TEE TRACE WIRE AS SPECIFIED L NOTE: PROVIDE TRACE WIRE AS SPECIFIED. JUMBO VAULT FLUSH UJITP Flt-,L GRADE QUICK COUPLER VALVE MASTER VALVE SEE SPECS. r UNION, TYP. ALL UNIONS TOBE PVC 5LIF,` TYPE FROM DOUBLE 00 CPECK r�c<:�) % 0 0 _6 VALVE 0 0 00 on O�O Li Li 4" CPP TO C:B z %= ALL SC14 W PVC PIPE FROM VALVE TO FLOW!5ENSOR TYP. ir nir�l a I: I m 10 rj N.T.S. NOTES: 1. DO NOT ALLOW VAULT TO REST ON PIPE USE EXTENSIONS 45 NECESSARY. 2. VALVE TO BE SET PLUM5 4 CENTERED IN VALVE BOX. 3. CONTRACTOR TO PROVIDE (2) EACH QCV KEYS AND SWIVEL HOSE ELLS. 4. PROVIDE 6" DEPTH DRAIN ROCK. FLUSH W1 FINISH GRADE CARSON 10" ROUND VAULT WITH LOC:KlI'-llG LID QUICK COUPLER VALVE as HOSE CLAMP (2) SC:W 80 PVC NIPPLE SCW. 60 PVC ST. ELL 4 SO" ELL 24 SC;W 80 PVC- NIPPLE, I" x 12" LENGTH if 0 0 Ocg,o 0 114 PROVIDE TRACE WIRE AS SPECIFIED. 5CW 80 PVC TT SO AND 3" LENGTH 5CW aO PVC NIPPLE STEEL 'T'FENCE POST, 36" LENGTH 9CH 40 PVC MAIN LINE QUICK COUPLER VALVE N.T.S. RESUB APR 2 12005 BUILDINGi DEPARTMEN' CITY OF EDMONDS 801 SECOND AVENUE SUITE 501 SEATTLE WASHINGTON 98104 206.682.3460 FAX 343.9388 9 A r6ii 1 -1 CENVER FOR THE A r% " K 0 is STATE OF WASHINGTON REGISTERED LANDSCAPE ARCHITECT EDWARD MACLEOD CERTIFICATE No. 191 mi mime alk REMSIONS NO DATE BY DESMPTION 1 A 4/4/05 REVISION TITLE IRRIGATION DETAILS DESIGNED LP DRAWN ws CHECKED Em DATE 10 OCT 2003 CADD FILE EdmondsJRR—Pln.dwq JOB NUMBER 03110 A Afm%� gPmfr& L I. -Al 1-1-01 WIN 12 GA. WIRE, --­, 2" MULCW 21, WT. SAUCER BERM SCARIFY SIDES AND al, BOTTOM OF PIT.— n ll I Mg ru Ma 9M.- I I mill I 20" GREATER THAN ROOTBALL CANOPY TREE PLANTIN't N.T.S. 111"m - BLACK FJJBBER HOSE. - WWITE PLASTIC TAPE FLAGS. - 2x2 WOOD STAKE, (2) PER TREE, SEE SPEC. -PLANT TREE AT SAME GRADE AS NURSERY. FINISHED GRADE AT TRLINK SHALL BE III HIGHER THAN SURROUNDING FINISHED GRADE. PROVIDE POSITIVE DRAINAGE FROM CRMK PROVIDE MIN. 28 MULCW OVER ENTIRE PLANTING BED, PROVIDE 2" DEPTH MULCH (PER SPEC.) FOR PIT PLANTED TREES AND TREES IN LAWN AREA, PROVIDE 3' DIA CIRCLE OF MULC�4'AROUND` BASE OF EACH TREE. REMOVE BURLAP, WIRE, AND NON -BIODEGRADABLE. ITEMS FROM TOP 1/3 OF ROOTBALL. FERTILIZER TABLETS AT ROOT BALL. PLACE TABLETS AT OUTER EDGES OF ROOTtALL, 1-2" BELOW T14E TOPSOIL SUM:ACE. FOR PLANTING ON SLOPES, INSTALL PLANT UPRIGHT AND LEVEL SOIL TO ASSURE COVERAGE OF ROOTS CIN DOUNWILL SIDE OF PLANT AND PROVIDE A 2" WTBAUCER BERM ON THE DOWNHILL SIDE, TYP. PLANTIN65 SOIL BACKFILL PER SPEC, SETTLE WITH WATER, DO NOT LEAVE AIR POCKETS, PLANTING SOIL PER SPEC. BACKFILL UNDER TREE, SETTLE WIT14 WATER - UNDISTURBED SU5GRADE OR COMMON FILL PER 45PEC. COMPACT TO S01% PRIOR TO SCARIFYIWG PIT 2" DEPTH MULCH SPEM DO NOT C PLANT RIJNNERS LEAVE$ WIT14 MUL TOPSOIL, SEE SPI EQUAL TO CON' Lu Lu = u IL Lu U w 0), I-o-&ITAILIM AMM OT14ER NON-1510DEGRADA]BLE ITEMS. PLANT 60 T14AT TOPSOIL SURFACE. 16 AT SAME GRADE AS NURSERY. .-CONIFEROUS TREE PLANTING - N.T.S. FERT. TABLETS AT ROOTBALL. PLACE TABLETS AT OUTER EDGE$ OF ROOTBALL, 1..2. BELOW T14E TOPSOIL SURFACE. FINISW GRADE BACKFILL ON SITE SOIL (APPROVED BY OWNER'S REP.). SETTLE WITH WATER, DO NOT LEAVE AIR POCKETS. REMOVE ROCKS LARGER T14AN lu SIZE FROM PLANT BED SURFACE PRIOR TO PLACING MULCH. .-XCAVATE. ONLY TO ROOTBALL :)EPT14. IM I4TII1PR;:n *AIRr.IPA = M COMMON FILL PER SPEC. 4 GROUND COVERTERNMERIENNIAL N.'T.S. PLANT TREE AT SAME GRADE AS NURSERY. FINIWED GRADE AT TWNK 614ALL BE I" HIG14ER THAN SURROUNDING FINIS14ED GRADE, PROVIDE PC61TIVE DRAINAGE FROM CROWN. PROVIDE MIN. 2" DEPTH MULCH (PER SPEC.). FOR PIT PLANTED AND TREES IN LAIN AREA, PROVIDE A VDIA. CIRCLE OF MULCH AROUND BASE OF EACH TREE. REMOVE BURLAP WIRE AND NON-BIDEGRADABLE ITEM FROM OFF TOP 1/3 OF ROOTBALL, MIN. 4" BELOW SOIL SURFACE. REMOVE WIRE BASKM AND NON -BIODEGRADABLE ITEMS. FERTILIZER TABLETS AT ROOT BALL. PLACE TABLETS AT OUTER EDGES OF ROOTBALL, 1-2" BELOW THE TOPSOIL SURFACE. FOR PLANTING ON SLOPES, INSTALL PLANT UPRIG14T AND LEVEL SOIL TO ASSURE COVERAGE OF ROOTS ON DOUN14ILL SIDE OF PLANT AND PROVIDE A 2" WT.SAXER BERM ON T14E DMWILL SIDE, TYP, PLANTING SOIL BACKFILL PER SPEC., SETTLE WITH WATER, DO NOT LEAVE AIR POCKETS. PLANTING SOIL, BACKFILL UNDER TREE -AND SETTLE UJIT14 WATER, UNDISTURBED SUBGRADE OR C4:lMMON FILL PER SPEC. COMPACT TO W% PRIOR TO SCARIFYING PIT M FERT TABLETS 6 ROOTBALL. PLACE TABLETS 0 OUTER EDGE$ OF ROOTBALL, 1-2" BELOW TO I L SURI"-ACE. FINISH T GRADE VARIES 6 "1 M11K T% IV T14AN ROOTBALL A CONTINUOUS OUTER ROW 0 MIN. SPACING PER PLANT SCHEDULE. TRIANGULAR SPACING INSIDE PLANT BED., EDGE OF PLANT114G BED — CENTER OF PLANT (TYP.) MIN. $I' FROM E06E OF BED FOR GROUN DCOVERS, PERENNIALS, AND FERNS. LOCATE TREES AND 514a.1156 AS $HOWK SPACING PER PLANT SCHEDULE (TYF.) 5 PLANT SPACING �N.T.S. - PLANT AT SAME GRADE AS NURSERY. PROVIDE MIN. 2" MLCW OVER ENTIRE PLANTING BED TO i V-011 FROM #C OF BIOSWALE. PLANTING SOIL BACKFILL PER SPECS., EDMONDS SETTLE WITH WATER DO NOT LEAVE AIR POCKETS. DO NOT DAMAGE ROOTS DURING PLANTI% OPERATIONS. CEN'TER FOR PLANTING ON SLOPES, INSTALL PLANT.UFRIGWT AND LEVEL SOL FOR THE TO ASSURE COVERAGE OF ROOTS nTs ON DOWNWILL.SIDE OF PLMT. Arx 1 PROVIDE A 2" SAUCER BERM ON THE DOWN14ILL SIDE. TYP. SCARIFY SIDES AND BOTTOM OF PIT. REMOVE ALL BURLAP, Win AND NON-SIODEGRADABLE ITEMS FROM ROOTBALL PLANTING SOIL STATE OF BACKFILL PER SPEC UNDER 614MB WASHINGTIDN REGISTERED SETTLE UT14 WATER LANDSCAPE ARCHITECT UNDISTURBED SUBGRADE OR COMMON FILL PER SPEC. COMPACT TO `3096 PRIOR TO SCARIFYIWG P . CERTIFICATE No. 191 R PERMIT REVISIONS 4 APRIL 2005 W DAIE By OEM= 1 A 4/4/05 REMSION -PLANTING DETAILS Lp DRAWN. MBM/MIDPOINT EN DATE 10 OCT 2003 .CADD FU 03110—DUAILS.dwq 03110 RE B n A APR 2 2005 Lam 1 u4 BUILDING REPARTMENT CITY OF EDMONDS