Loading...
430 3RD AVE S.PDFIIIIIIIIIIII 4980 430 3RD AVE S z 4 0 0 ADDRESS: �iLLL ��, 419:�l TAX ACCOUNTI/PARCE'L#: BUILDING PERMIT (NEW STRUCTURE) #: �IA COVENANTS (RECORDED) FOR: CRITICAL AREAS #: DETERMINATION: [I Conditional Waiver I Study Required E] Waiver CRITICAL AREAS #: DETERMINATION: El Conditional Waiver El Study Required El Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit Vs): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED: &9z STREET USE/ENCROACHMENT PER�If #: FOR: WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc APPLICATION for The City of Edmonds, SIDE SEWER PERNaT EASEMENT No . .......................................... NEW CONSTRUCTION E) REPAIRS 0 too- 0q,360 OWNER..... H0.11-3 .... c7p .. pason ....................................................... CONTRACTOR .................................................................................................. PERMIT No . ...................... ADDRESS .43-0 .... 3 --- r ---- d .... Ave-...%5. -------------------------------------------------- LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ -9 0 NAMEOF ADDITION ......................................................................................................................................... JUno-, 117()L Dya- 7(7s�ad 0/) (5cw4Lr(&p54&1%-.$) Approved: DATE................................................ By ...................................................................... 04 CITY OF. EDMONDS S [Qf'� SE i�T Eft M I T PERMIT No': 82-51 STRF� i Zim Address of Construction: Property Legal Description (Include all easements): RECEIVED EDMONDS 2 U 188U TREATMENT PLANT PUBLIC WORKS J Owner and/or Contractor: 3J-1712 Ic A ]�Z if— S. < 'tj /;7 y -r C.;' State License No 2 t-Z_ c, 'CA-2 17 Z &�4 Building Permit No. (,e� 0 Single Family j Multi -Family (No. of Units 11 Commercial 1:1 Public Invasion into City Right -of -Way: F No 0 Yes RW Construction Permit No. Cross other Private Property-.0 No 13 Yes Attach legal description and copy of recorded easement T—certify that I have read and'shall comply with all city requirements as indicated on the back of the Permit Card. —!? — --�_ C' Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC.WORKS DEPT,,)* Permit Fee: .30— Issued By i. aA Trunk Charge: 17.5 Date Issued: Assessment Fee: Receipt No.: fS7f log Lid No.: — Partial Inspection: Date -Initial. Comments. Reason Rejected: Date -Initial Final Inspection Approved: Date Initial PERMIT MU�,TBE POSTED, ON JOB SITE White Copy: File py: Inspector Puff Copy: Applicant �Gi4 0 Re�ised 3!90 Side Sewer Drawing The, City of Edmonds EASEMENT NO . ............................................ NEW CONSTRUCTION REPAIRS Fj LID NO . .................. . ASMT. NO . .................. CONTRACTOR ................................................ .............. MIT NO.&Zl�ll OWNER................. ..................... a -------------------------------------------------- ................ PER ............ JOB ADDRESS ....... 0.14 u- .... .. ......... LEGAL DESCRIPTION: LOT NO . .......................... ........... BLOCK NO - ------------------ ................. . ................. ........... I -------------------- ---------- EDPAONDS ........... ..... TREATMENT PLANT NAMEOF ADDITION ............................................................... ....................................................... z N 19 ME �7& 0 CA cp"4 a L4 T 1, 0 M A t4 tA * k e, c, 0 YuM?-S-T4'- Wu Wol 37 1 3 I I ---- 7(,'--t- I YA L� e-�-V kA U, v t;, k v 5,A PWW-0001-1 1/75 (REV.1 1178) P;P 4 3 z 30 30 zo 43 q- Approved: DATE ....... ---- Bye4� - --------- W .... ................ tA ek Wk .0, r S T E!R,,M I T CITY. OF,EDNIONDS SIDE, WER �J2 3 2 5.0, P�ERMIT .,STR'EE' T FILE Address oftonstructiom. V. Property Legal Description (Include all easements): EDMONDS RECEIVED I HEA FIVIEN I Pt 159U SEP 2 0 PUBLIC WORKS Owner and/or Contractor: ;51 /V Veg',lf_ A-) L"2.AJ.4� lei it No. State License No*. fz �R- Building Perm El Single Family' Multi-Fa.mily. (No. of Units /2- Commercial 13 Public Invasion into City Right -of -Way: No. 0 Yes RW Construction Permit No. Cross other Private Property: Q/`No Yes Attach legal description and copy of recorded easement I certify that I have read and shall comply with all city requirements as -indicated on the back of the Permit Car6' Date CALL DIAL -A -DIG (1-800-424"-5555) BEFORE ANY EXCAVATION OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. Permit Fed: Issued By Trunk Charge: 300— Date Issued.: - Assessment Fee:. Receipt No.*. /3os7 Lid No'.: 4,10 E-Sk''101 Partial Inspection: Date—Initial-- Cbmment� Reason Rejected: Date Initial Final Inspection Approved: Date7- I I( Initial 'PERMIT MUI T-.B,E POSTED ON JOB SITE 'S 7 White Copy: File Green Copy: Inspector Buff Copy: Applicant Revised 3,190 Side Sewer Drawing The� City of Edmonds I NEW CONSTRUCTION Z' OWNER......... .................................... ----------- ------------------------------ -LZ. 1�0 - JOB ADDRESS ........................................ 1j, La a 100 LOR ni REPAIRS F EASEMENTNO . ....................................... LID NO . .................. ASMT. NO . ..... CONTRACTOR.............. .................................................. -------- I ......... PERMIT NO . ... . ............ LEGAL DESCRIPTION: LOT NO . ......... — ------ ................ — BLOCK NO . ................................... ............................... ......... .......... FLUONDS ........... .. ... TREATMENT PLANT NAMEOF ADDITION ............................. -- ..................................................................................... P; Z_ 371 P 3 0 i,,A A A IA * k r, -, 0 YUMf.5-V6,. �14CT WFjj 4 2, 8 I I -:,-- 74,'---- 1 A 0 kA L%.v---> —k-o 5,K%,r,&-r& PWW-000 1 - 11/75 (R EV. 11/78) 4 3 z 4P :2.- --c- 1 3c) , a 3A� t, 1, P. fill c Approved: DATE....... .... ByZ� ............ ............... 43 q- Pie. 8 9 0 9 .6 Nx T E, R M IT. CITY OF EDMONDS,,- SIDE. SEWER PERMIT N 0- 32 1, -1 STR:�LT FILE,,' Address of Construction: Property Legal Description (Ihclude all easements): V e_. I !� C., I TREA11MENT PLANT ul REItIEIVED _qF P a ANU pi.jugG WORKS F Owner and/or Contractor: XI 0 YA-) 7�_ V ou J-2 e' a it, Vt c- State License No. ,6 1Z 9— 0 471 Ce Building Permit No. -o 13 Single Family Multi -Family (No. of'Units.:E El Commercial El Public I Invasion into City Right -of -Way: CO No 11 Yes RW Construction Permit No. Cross other Private Property: No 11 Yes Attach legal description and copy of recorded easement I certify that I have read andvShall 66rply.with all city requirements as indicated on the back of the Permit C�rd. �? -, C) Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. Permit Fee: 30 Issued By J3-6 Trunk Charge:-20o— Date Issued: e-7— 2Z —�?O Assessment Fee: Receipt No.: .3 1 167 Lid No.: — Partial Inspection: Date —Initial — Comments Reason Rejected: Date —initial Final Inspection Approved: Date-L-11 Initial PERMIT MUST BE POSTED ON JOB SITE Whitebopy! File Green�Copy: nspectw Buff Copy: Applicani Revised 3!90 Side Sewer Drawing The, City of Edmonds EASEMENT NO . .............................. ........ NEW CONSTRUCTION REPAIRS r-1 LID NO. ..— ............. ASMT. NO . ............ OWNER ................ ........................ ------------------------------------------------------ CONTRACTOR ........ -- .............................. ................... PERMIT NO. ---------------- JOB ADDRESS --------- ......... 40—t . ...... ----- LEGAL DESCRIPTION: LOT NO . .......... . ............ 1— ........ BLOCK NO . ............................. .................................. ------------------------------------------ ---------- EDMONDS ........... ... TREATMENT PLANT NAMEOF ADDITION ............. --------------------------------------------------------------------------------------------------------- Ll &7 1101 0 0 i'-A A tA kA ot r,. c., 0 FUM? \14F-T WfJj 37 Z M P; 432- Lee,. I It so, &P 4- 1 -2-- --c- I So I Y. C, D a f r 9(e PWW-000 1 - 11/75 (R EV. 11178) YAO e,� - v U. v t�, to DATE ....... ---- Bye��. *REET FILE' CITY OF EDMONDS. SIM E -.�S,E, W EIR P E R M IT PFRMlt -KI0 09 A Q Address of Construction: Property Legal Description (Include all easements): EDMONDS TREATMENT PLAN7 0 RECEIVED S,EP 2 0 -Iwu PUBLIC WORKS f Owner and/or Contractor: r—AJ N State License No. Iq i- C- 171 Building Permit No. 0 Single Family Invasion into City Right -of -Way: Q No El Yes /2 N.ulti-Family (No. of Units RW Construction Permit No. El Commercial Cross other Private Property �v No El Yes 11 Public Attach legal description and copy of recorded easement 1—c—ertify that I have read anj shall co"�M` ply with all city requirements as indicated on the back of the Permit Card. Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE'USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC.WORKS DEPT. Permit Fee: Ro Issued By SR6 Trunk Charge: 5D Date Issued: 61— 2a —10 Assessment Fee: Receipt No.: 130.5-;z Lid No.:—'F5,k 10 q Partial Inspection: - Date —Initial — Comments Reason Rejected:- Date —Initial — Final Inspection Approved: Date Initial T- PERMIT MUSTBE POSTED ON JOB SITE;.** White Copy: File Green Copy: Inspector Buff Copy: Applicant Revised 3190 Side Sewer Drawing The. City of Edmonds EASEMENT NO. — ........... --------------------------- - NEW CONSTRUCTION REPAIRS F-1 LID NO . .................. . ASMT. NO - ------------------ OWNER.......... ....................................... .................. .......................... CONTRACTOR ............ ................................... .......... ---------- 1— ....... PERMIT NO. JOB ADDRESS .. ......... .... Aji ..... ISP .... *1 ........ LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . ............................ ....... .................................. ... ...... EDMONDS- ....... . ...... TREATMENT PLANT 1p I NAMEOF ADDITION ....................... ...... ............................................. --------- ............................ Ll, �7& N 0 c, L4 T c, 0 �A c � r, c, 0 Yu vi 6-f 4'. \14 F-T Wy 4�1 8 37 3 I I --- 74,' r yAL� e-�v NkA Uv> kv PWW-000 1 - 11175 (R EV. 11/78) P P;,D 1+32- 4P -*- --c- 1 30 , rL /--, - N, � :2. _Vc 30, \-. P. 43+ Approved: DATE..� ....... All.... Byz, .............. City of Edmonds Critical Area Notice of Decision Applicant: Property Ownet: (-eo*, co"do-5- Critical Area File #: 612� -2 IO(OS-g PermitNumber: 0 Site Location: 3,2p A-W— 5 Parcel Number: 00-7 449 00 0 120 50 0 Project Description: Z_; VConditional Waiver. No critical area report is required for the proj ect described above. There will be no alteration of a -Critical Area or its required buffer. 2. /YL The proposal is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40,120, Mitigation sequencing; 2. Theproposal does not pose an unreasonable threat to the public. health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this ti tle and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordancewith ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does'not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Conditions. Criti cal Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). Reviewer J &-Z &�� Signature �, 2- Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 City of Edmonds E= Critical Area Notice of Decision Applicant: J L: � j S Property Owner: Critical Area File #: C-1-F A D 0 L-, 7 6 C)�-B Permit Number: L) Site Location: Parcel Number: 6 0-� 9q e'oo J)�a S-0 0 Project Description: L-,4 t , SV A7V--� "- f - J &-&-e V--- I IR-Conditional Waiver. No critical area report is required for the project described above. There will be no alteration of a Critical Area or its required buffer. 2. a ,�<�The proposal is an illowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or-4 OIL" 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. Fj Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. / f-j Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. �N-Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria ih ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. F� Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). I Ikeviewer �ignature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 Zone Corner tJ Flag� Setbacks Required Actual :"I'APP�RPVED BY LANNING, 1� — Vl-Ulll �NNING Front tv C4, Sides io It 0 /) - W- Rear 1A 0 eT�� Other qieip-ht —7 IAJV lz A) UA —A X V. i5L— V � OL L L T- 7 fhl Ell r -z-*. -z- Trqm ITT Z- --7LL -z- X, 7- 1- z 0 P Tl-r cff Qk= 7 2011 J U N/ 2 �Kl ts U I C CITY,' OF EDMONDS CONFORMED COPY E105180542 2 PGS N011 415r ROO SNOHOM Sh COUNT , SHINGTON Return Address: City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 ACCESS AND UTILITY EASEMENT Property Address: 428, 430, 432, 434 3rd Ave S., Edmonds, Washington 98020 NO EXCISE TAX REQUIRED MAY 18 2011 KIRKE 81EVERS, snoliontn GOLIRY freasuref �,v KIRKE SIFVERS Assessor's Property Tax Parcel Nos.: 00799000110100, 00799000110200, 00799000110300, 00799000110400, 00799000110500, 00799000120100, 00799000120200, 00799000120300, 00799000120400, 00799000120500, 00799000210100, 00799000210200, 00799000210300, 00799000210400, 00799000210500, 00799000210600, 00799000220100, 00799000220200, 00799000220300, 00799000220400, 00799000220500, 00799000220600, 00799000310100, 00799000310200, 00799000310300, 00799000320100, 00799000320200, 00799000320300, 00799000320400 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, 3rd Avenue Condominium Association, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, 'Operation, maintenance, repair, reconstruction or replacement of a sanitary sewer fift station and appurtenances, over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said sanitary sewer lift station and appurtenances, together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is more particularly described as follows: A UTILITY EASEMENT OVER, UNDER AND ACROSS THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, WM, SNOHOMISH COUNTY, WASHINGTON BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED AS -CONSTRUCTED CENTER -LINE OF THE LIFT STATION WET WELL, FORCE MAIN, VALVE VAULT, OVERFLOW STORAGE VAULT, ELECTRICAL CONDUITS AND ENCLOSURES; COMMENCING AT THE SOUTHEAST LOT CORNER OF THIRD AVENUE CONDOMINIUM, AS RECORDED UNDER RECORDING NUMBER 9110315001, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. THENCE NORTH ALONG THE EAST PROPERTY LINE N 00*38'39" W 10.57 FEET TO THE TRUE POINT OF BEGIINING; THENCE N 73* 19'03" W 34.47 FEET; THENCE N W 11'39" W 73.16 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 33.68 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE RIGHT, HAVING A RADIUS OF 30.00 FEET, THROUGH A CENTRAL ANGLE OF 64-19'54"; THENCE N 19051'45" W 44.11 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 25.21 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 20.00 FEET, THROUGH A CENTRAL ANGLE OF 72-12'24"; THENCE S 87*55'5 1 " W 5 8.98 FEET; THENCE N 68'43'16" W 31.64 FEET TO POINT "A"; THENCE S 85013'41" W 76.82 FEET TO THE TERMINUS OF THIS CENTERLINE DESCRIPTION; TOGETHER THAT PORTION OF SAID NORTHEAST QUARTER OF SECTION 26, BEING A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE; BEGINNING AT SAID POINT "A" THENCE N 00'40'09" W 23.40 FEET TO THE TERMINUS OF THIS CENTERLINE DESCRIPTION; SAID EASEMENT SHALL EXCLUDE ANY EXISTfNG BUILDING STRUCTURES, NOT INCLUDING SCREENING FOR ELECTRICAL EQUIPMENT. THE SAID LINES OF SAID EASEMENT TO BE EXTENDED AND SHORTENED AT INTERSECTIONS WITH BOUNDARIES OR CHANGES IN DIRECTION TO TERMINATE ON THE BOUNDARY LINE OR ON ADJOINING SIDE LINES. TOGETHER WITH: AN ACCESS EASEMENT OVER AND ACROSS ALL ROADWAYS AND PARKING ACCESS AREAS WITHIN THE LIMITS OF SAID PROPERTY AS NECESSARY TO OPERATE, REPAIR, REPLACE AND MAINTAIN THE SEWER FACILITIES DESCRIBED IN SAID UTILITY EASEMENT. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. See attached Exhibit "A" THE CITY agrees to restore to substantially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any future permanent structure over, upon, or within the permanent easement. DATED THIS 'I DAY OF 6 10:��: 20 /1 STATE OF WASHINGTON) )SS COUNTY OF SNOHOMISH) I certify that I know or have satisfactory evidence thatl/�,,,�,L L .. N,' // — is the person who appeared before me, and said person acknowledged ti;a-t (he/she) signed this instrument, on oath stated that (he/jUe was authorized to execute the instrument and acknowledged it as the of 3' Avenue Condominium Association to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated ...... . ....... 7.-.// ........ ................. . .. (Signature) (Seal or stamp) .......... ........... ... ... . ....... ........ Title 1 My appointment �2 expires .... . ... ..... .. A PORTION OF SEC 26, TWIP 27 N, RGE 3 E, W. M. IN SNOHOMISH COUNTY, WA. EX. BLDG #434 0 MANHOLE OVERFLOW NOTE: PERMANENT SEWER -STORAGE VAULT EASEMENT IS 20 FEET IN WIDTH, CENTERED ON S 85'1,3'41" Wl CENTERLINE OF CITY'S M76.82'1 OVERFLOW STORAGE VAULT, WET WELL, VALUE VAULT, WET WELL N 00'40 09 FORCE MAIN, MANHOLES, ETC, 11 ' 23.40' UNLESS EASEMENT CONFLICTS POINT A" - Ln NTH BUILDINGS (OTHER THAN VALVE VAULT CONTROL CONTROL SHELTER). IN THOSE In SHELTER INSTANCES WHERE CONFLICTS O�— OCCUR, DIMENSIONS ARE SHOWN. DIMENSIONS SHOWN 9.5' IN 68*43'16- W] —7,31,64'1 ARE TO THE NEAREST 0.5'. WHERE DIMENSIONS CONFLICT WITH LEGAL DESCRIPTION, THE LEGAL DESCRIPTION lun) SHALL TAKE PRECEDENCE- EX. BLDG #4 32 Q0 �72*1 2'24� L 2 MAMMON 87*55'51 " W 158.98'[— CENTERLINE OF IN 19'51'45" W 2 0 FORCE MAI�_ I __L44.1 lJ_ EX. B �7LDG #428 �:6 4'1 9'5� L 33.68 7n nn 0 1,39' _84'1 7 3.16' [N7 3 -1 �9'O 3 �W 134.47'1 POINT OF 9' 5' 4 50 25 0 50 BEGINNING!�� 3RD AVENUE E; S SCALE IN FEET 12507SEL-RED ROAD SUfTE101 SCOle EXHIBIT "A" WO BELLEVUE, WA 98005-2500 1 50' CHS ENGINEERS, L I C Mt425)637403 FAX(42JIM7-M94 CITY OF EDMONDS Sheet LIFT STATION #5 E SEWER EASEMENT Drawn by ic Project # 450901 1 Checked by DF Date 03/29/1 I CONFORMED COPY J�1105180542 2 PGS 11912011 4:Pr , N.00 SNOHOMISH COU T ASHINGTON Return Address: City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 ACCESS AND UTILITY EASEMENT Property Address: 4Z8, 430, 43Z, 434 3rd Ave S., Edmonds, Washington 98020 . . . . . . . . . . mzma� 1- MAY 18 2011 K KIRKE SIEVeRs, Switoniten �Oun(Y freasuter K�PKE 131P�/ERS Assessor's Property Tax Parcel Nos.: 00799000110100, 00799000110200, 00799000110300, 00799000110400, 00799000110500, 00799000120100, 00799000120200, 00799000120300, 00799000120400, 00799000120500, 00799000210100, 00799000210200, 00799000210300, 00799000210400, 00799000210500, 00799000210600, 00799000220100, 00799000220200, 00799000220300, 00799000220400, 00799000220500, 00799000220600, 00799000310100, 00799000310200, 00799000310300, 00799000320100, 00799000320200, 00799000320300, 00799000320400 IN CONSIDERAUON of benefits to accrue to the grantors herein, the undersigned, 3' Avenue Condominium Association, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a sanitary sewer fift station and appurtenances, over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said sanitary sewer lift station and appurtenances, together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is more particularly described as follows: A UTILITY EASEMENT OVER, UNDER AND ACROSS THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, WM, SNOHOMISH COUNTY, WASHINGTON BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED AS -CONSTRUCTED CENTERLINE OF THE LIFT STATION WET WELL, FORCE MAIN, VALVE VAULT, OVERFLOW STORAGE VAULT, ELECTRICAL CONDUITS AND ENCLOSURES; COMMENCING AT THE SOUTHEAST LOT CORNER OF TMRD AVENUE CONDOMINIUM, AS RECORDED UNDER RECORDING NUMBER 9110315001, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. THENCE NORTH ALONG THE EAST PROPERTY LINE N 00038'39" W 10.57 FEET TO THE TRUE POINT OF BEGINNING; THENCE N 73019'03" W 34.47 FEET; THENCE N 84011'39" W 73.16 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 33.68 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE RIGHT, HAVING A RADIUS OF 30.00 FEET, THROUGH A CENTRAL ANGLE OF 64-19'54"; THENCE N 1905 1'45" W 44.11 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 25.21 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 20.00 FEET, THROUGH A CENTRAL ANGLE OF 72-12'24"; THENCE S 87'55'51" W 58.98 FEET; THENCE N1 6804316" W 31.64 FEET TO POINT "A"; TH ENCE S 85'13'4 1 " W 76.82 FEET TO THE TERMINUS OF TIES CENTERLINE DESCRIPTION; TOGETHER THAT PORTION OF SAID NORTHEAST QUARTER OF SECTION 26, BEING A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE; BEGINNING AT SAID POINT "A" THENCE N 00040'09" W 23.40 FEET TO THE TERMINUS OF TUIS CENTERLINE DESCRIPTION; SAID EASEMENT SHALL EXCLUDE ANY EXISTING BUILDING STRUCTURES, NOT INCLUDING SCREENING FOR ELECTRICAL EQUIPMENT, THE SAID LINES OF SAID EASEMENT TO BE EXTENDED AND SHORTENED AT INTERSECTIONS WITH BOUNDARIES OR CHANGES IN DIRECTION TO TERMINATE ON THE BOUNDARY LINE OR ON ADJOINING SIDE LINES. TOGETHER WITH: AN ACCESS EASEMENT OVER AND ACROSS ALL ROADWAYS AND PARIUNG ACCESS AREAS WITHIN THE LIMITS OF SAID PROPERTY AS NECESSARY TO OPERATE, REPAIR, REPLACE AND MAINTAIN THE SEWER FACILITIES DESCRIBED IN SAID UTILITY EASEMENT. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. See attached Exhibit "A" THE CITY agrees to restore to substLtially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any future permanent structure over, upon, or within the permanent easement. DATED THIS I DAY OF 6 &:�' 20 /1 STATE OF WASHINGTON) )SS COUNTY OF SNOHONHSH) "Z" I certify that I know or have satisfactory evidence that , /r 1-4-IC # is the ��Lql a / 4, L person who appeared before me, and said person acknowledged that (he/she) signed this instrument, on oath stated that (he/§hej was authorized to execute the instrument and acknowledged it as the of 3' Avenue Condominium Association to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated ...... ------ 7.-// (Seal or stamp) (Signature) Title My appointment expires ... ... ........ Zone� R pA q Corner�_�Flag_t�_ APPDOVED BY LANNING Setbacks Re uired Actual Q 0 Sh /#§ Front I ED B LANI it) .77 Sides 7 14 - vj No;/ 0-7 )-- DV% 1�� Rear 9V,-4 1 Other -7' :2r; 75 4- 7// 14 j_v IIAIV -AU- V. M) rrz: ry I L E Ell Wv. I-0.1 r- r r r S/1- 7 n LjF 1:1213mm 9/�T fTT --AL , III Z- [�/=- tli rr - P-r- I F JUN 7 2011 CITY .,,OF EDIMCN.-S LL U-i oc. Co I �j %4 s S S 'AL 7,C�- 7-1 Z),L-/, c4 , t W"' 16-�Ilr JX /00 OA-)e,0,4V5 dxA4141C M 4 4-. z �t 4LD 4�21- 0,'9, ID91;1 -72 f5X 7, j6 6 -7 Jtp '7745 4:1'- IC*r- : o -7 c2- 9 "�Zl 3y, " ' �ok "' ":­, ul water head per loo ft. of pipe WWI v I �11 2.10.-; L- L. V..' ! 47 1.20 0.89 IM I Lou vel LOU VII L'a vel Lau -0-23 12.7 2 41 3.29 1.49 1.01 86 .27 .63 .12 6- 3A. 26,01 361 6.91 2.21 2.14 ' 8-45 46.1 4.82 11 a 2.9 1.29 .57 94 .26 .57 M 8 3.68 1.72 .95 1.'26 45 .77 10 10.6 69.1 6.02 17'9 3.72 5.50 2.14 .16 .52 .05 12 1-44 1 57 67 -96 .24 .65 .08 7.11 4.9 4.46 7.71 2.57 2.o2 I.S9 15 2 .94 .IS 43 03 18 9.02 37-6 5-60 11.8 3-21 3.05 2.36 1 .37 .78 .11 S2 .03 2 10-8 50.9 6.69 16,5 3. .41 ].So .51 .96 .17 .61 .07 .49 .03 20 3'P'PE' '12-0 (13-9, 7.44 19.7 86 4'2" 2-8) I-W 1.72 .70 1.18 .24 .78 .10 N 4.29 5.21 3-15 2.44 1.01 b6 1.31 -Sa .04 30 .49 .02 9 10 30.1 5.36 Mo 3-80 3.43 2. .20 .87 .12 .65 .0s .51 35 .57 .03 ]-IS 41.8 6.43 lo.b 4.72 5 50 1 '8' 1-6) .43 1.09 .1h .81 .03 --------- 133.0-2- 535.9 .17 -2.80 f.go 1.96 .61 08 .64 .04 7-SI 14.7 S-51 6.91 3.3$ 2.40 2-3S 1-30 -25 .97 :11 .77 o6 40 .61 .04 6' PIPE .81 1.51 .31 1.14 .15 .89, _08 .73 o4 14-M 71.4 8-58 18.8 6.30 883 �ilQ_ )10 1-68 1-03 1.74 16.70 9.65 23.5 7.08 lo: 9 .43 1.3o SO .82 .05 .57 .01 10.72 28.2 7.87 13.3 TV -TV 3.02 1.32 1.95 .54 1.46. .19 - 1.02 .10 55 '90 -()6 -62 .02 11 .4-78 4.61- ).3S .24 1.15 .13 X, .98 78 33.8 8.66 16.0 1-36 2.17 .6S 1.62 .29 1.28 .16 .07 68 .03 12* 526 5,5$ 3.69 1.88 2.19 65 1.06 -09 :74 .04 1 87 40.0 9.44 IS-6 5.74' 613' '4.02 2.1 '74 1.70 -34 1.41 .19 0 10-23 21.6 9 2.60 90 1.95 .40 1.53 .22 70 1-14 .10 - 6.21 7-56 4.36 2.53 2.81 1 * 75 .79 .04 11.01 53.1 11.02 24.9 6.69 864 .02 2.06 .47 1.66 .23 1.22 .11 .85 .05 4.69 2.91 bO 1.31 16-06 60.6 11.80 28.2 7A7 3-04 1.21 2.27 .13 .91 .05 17.16 68.2 12.69 32,0 9-82 3.03 3.33 3.25 1.41 2.32 -54 1.79 .30 85 1.39 is .96 .06 18.21 7.65 11.1 5-36 3.71 3.49 1.54 2.60 .60 1.91 .34 90 1.47 .16 1.02 77.0 13-38 )5.3 8.13 12.5 5.70 .69 2-04 .38 .07 19-30 84.6 14.71 39.5 3-81 3.69 1.66 2.62 �76 2.17 .42 9S 1-53 'IS 1-08 .07 14-95 43.7 8.61 13.8 6-03 4.61 3.91 1.92 2.92 -85 2.30 .47 100 1 63 9.08 Is.3 6.37 5.07 4 lio ' -19 1.13 ­08 .12 2AW 2.93 .96 2.42 1.79 .23 LIS .10 15-74 47.9 9.56 16.8 .53 120 1196 17.31 57 670 5.64 4.34 2.33 3.25 1.03 2.55 .27 j�36 -11 8' PIPE .3 10.5 20.2 7:37 . 6.81 4.77 .57 130 2 12 31 1.47 .13 18-89 67.2 2-82 3.57 US 2.81 .69 11.5 23.3 8.04 7.89 5.21 3-29 3.99 1.45 3.06 140 2 29 .36 1.59 20-46 78.0 12.4 27.3 8.71 .80 150 2' .15 -90 .04 8.79 5.64 3-81 4.22 1.68 3.31 .93 ' 45 .41 1.70 .17 .96 o4 22-04 89.3 13.4 31.5 9.3t 10.5 6.05 4 32 4.54 1.93 157 1.07 1600 2o6i .46 1.80 23.6 14.3 35.7 .19 1.02 -05 10-00 12.0 6.51 4.93 4.87 2.19 3.82 1.23 17U 2.'77 -7si 1.92 21 1.08 .05 15.3 40.4 10.7 13.6 6.S4 5.54 5.19 2.47 4.08 1.37 180 2-94 .57 2.04 24 ),Is .06 16.3 45.1 11.4 16.0 7.36 6.2 190 3.10 .63 2.16 26 1-21 .07 IV PIPE 17.2 50.3 12.1 5 5-52 2.75 4.33 1.33 200 3.27 .70 2,27 :29 1,28 .07 18-2 55.5 12.7 16.8 7.81 6.58 3.85 3.07 4.6o 1.7o 220 3.59 19.1 60 C 1 11,6 1.24 7.28 6.17 3.39 4.84 1.88 3:7 240 3.92 -83 2.44 .34 1.40 o8 '90 .03 0 7,:4 14 4 20-1 8-68 8.36 6.50 373 5m 2.()6 .98 2.67 -41 1.53 9 24.9 260 4.2 .10 9-55 10-0 7 14 4'45 5.62 2.44 5 1.13 2.89 47 1.66 .11 1 -9 22.9 OS.S 16.1 28.7 10.4 11.8 - 7.79 5.22 6.11 2.91 280 4.50 1-30 3.11 :54 1.79 .13 1.1 '04 24.9 99.2 17.4 33 .S .04 0 11.3 13.7 8.44 6.07 6 300 4-90 1.48 333 .62 1.91 .15 1.22 .05 18.8 38'1 1.2.2 15.7 9-09 6.95 -64 3.28 320 5.13 1-66 3.56 .69 2.03 20.1 7-15 3-8S 340 5.44 1.87 3.78 . .17 1.31 .06 21.6 43' 2 13.0 17.9 9.74 7.90 76 2.18 -19 1.3 48.4 13.9 20. 1 lo4o 7.66 4.37 - 9 .07 12' PIPE 22.9 54.3 8-88 8.17 360 , 5.77 2.07 4,00 2. 14.8 22.5 lj.*oo 996 380 6.19 2.28 4.22 30 -21 J-47 07 8.58 3-so 400 6.44 :94 2.43 .24 1 55 ob 1-08 .03 24.2 60.2 15.6 24.9 11.70 11.0 9.10 2.5 4-43 1-03 2.00 .25 J:63 .' 25.6 66.7 6.15 4SO 7.20 3.1 09 1.14 .04 16.5 27.7 12.3 12,2 9,19 6S8 5.00 1.29 2.91 .32 1 26.8 73.3 17.4 30.6 13.0 SOO B-02 3.8 S. s6 I . .84 .11 1.2ti .05 13.4 1010 7.51 550 8.82 4.5 6.11 36 3.19 .39 2.04 .13 1.42 OS 19-5 36.7 23.9 16.7 11*49 9.31 __ --- - ----- "86 1-52 .46 2 24 .16 1.56 .06 21.7 46.1 16.2 20.3 000 9.62 --- -_ :z :. _' .__ 12.6 11.3 650 10.40 5.3 6.65 2.19 3.81 .54 2.45 -" 1.70 .07 24.3 13-0 13.5 6.2 7.22 2.53 4.16 .63 2.65 26 - 700 11.2 7.1 7.78 2.92 -21 1.84 .09 -0 64.4 19.5 28.5 15.10 IS.8 750 12.0 &.1 4.40 .72 2.86 .24 J.W Io 28.2 21-1 33.0 16.40 I8.j 800 12.8 9.1 6-34 3-3s 4.80 -82 3.06 .28 2.13 .11 22.7 37.9 17-60 2J.1 850 13.6 8.90 3.74 3-10 -89 3.26 .11 2.27 .13 24.4 43.0 18-90 24.0 900 14.4 10-2 9.45 4.21 5.'48 1.03 3.47 -3S 2.41 .15 26-0 48.4 20-20 26.6 950 15.2 11-3 10-0 417S S 7S 1.16 3.67 .39 2.56 27.6 54.1 21.4 30.1 1000 16.0 12-5 10-5 5.26 6:06 1.15 3.88 .43 2.70 : Is* -------------------------- 13.7 11.1 5.66 * 6.38 1.40 4-06 22.7 31.4 IIW 17.6 16.4 12.2 684 48 1-84 .19 1200 19.61 7.03 1.65 4.49 :56 3.13 .23 1300 20.8 19.1 13.3 8 *04 7:66 1.96 4.9U .66 3.41 .27 14.4 6 8.30 2.28 5.31 .76 1.69 .31 1400 22.4 15.6 10.6 8.95-2.59 5.71 -.so- 1500 24.0 16.7 12.0 3.98 .37 ------------------- 1600 25.6 17.8 12.6 9.38 2.93 o.12 1'.00 4.26 .42 1800 20.0 10.21 3.29 6.53 1.12 4.5$ .46 2000 22.2 11-50 4.)3 7.35 1.39 5.11 .57 2200 21 4 12-78 5.03 8.16 1.69 5.68 .70 _'ZO 4.05 6.00 8.98 1.99 6.25 85 2 ��­ !� " 2600 'u./ 15-32 6.7 9. bO 2 37 IWO 3000 '3200 3500 38W 42(k) 4 5ou 5wo 55W 10.61 2.73 .01 7.38 Vb 1.14 11-41 3-IS 7.9S 1.29 12-24 3.58 8.52 1.48 13-05 3.7 9-10 1.65 14-30 4.74 9.95 1.96 15-51 6J 10-80 2.30 11-92 2.76 12-78 3.24 14.20 3.95 0.1) .d"- t� _Ale DUPLEX HYDR-0-GRIND HYDR-O-RAIL PACKAGED SYSTEM SPECIFICATIONS GENERAL Furnish and Install a complete pumping system as manufactured by HYDR-O-MATIC Pumps, Ashland, Ohio. System &hall Include two sewage grinder puipp, three 3900 mercury switch level controls. discharge plumbing with hydraulically sealed discharge flange. pump mounting plates with bottom rail supports. upper rail supports.. lifting chain, pedestal mount and cord sealing plate for panel or NEMA IV Junction box; to be In§tallod In factory fabricated basin with cover or on -site conc(ole basin. A NEMA IIIR weatherproof control box shall be supplied- for- mounting at the sump site or remote from the basin as required. Structure and dimensions to be as shown on drawing sheet .1 of 1 OPERATING CONDITIONS Each pump -shall have a capacity of opm against.& total head of 670 feet. Pump motor shall be -1 - hp. I phase. 2-10 volts, 54�2_0 rpm. s Ld - cycle. Pump performance -shall -be as showyn.on,curvo 490 Separate specification for pump and motor. SUMP LEVEL CONTROLS Sealed float type mercury switches phall be supplied to control sump level and alarm signal, It furn(shod. The mercury tuba switches shall be sealed In a solid polyurothane float for corrosion and shock resistance. The support wire shall have a heavy Neoprene jacket. A weight shall be attached to cord above the float to hold switch In place In sump. Weight shall b�.abovo the float to effectively prevent sharp bonds In the cord when the float operates. The float switches shall hang In the sump supported only by the cord. Three float switches shall be used to control level. One for pump turn -on, one for pump turn-off, and one for both pumps turn - on. A fourth switch &hall be provided It with alarm. Float switches shall be Model No. 3900. OPTIONAL Alarm light (or bell or horn) to be supplied In separate NEMA III enclosure for mounting at the control box or remote from box. or alarm light mounted on panel enclosure (200,230 volt only). Alarm bell or horn shall have'ellokIng switch wlth'automatic reset. —Alarm Llgqt Model No. Alarm Bell, Model No. —Alarm Horn Model No. Std - Alarm light mounted on panel enclosure OPERATION OF SYSTEM On sump level rise lower mercury switch ohallfirst be energized,. then upper level switch shall next energize anO.atart lead pump. With load pump operating, sump level shall lower to low *witch lurn-off setting and pump shall stop. Alternating rolay #hall Index on stopping of pump so that lag pump will start on next operation. it sump level continues to rise when load pump Is operating, overrido switch shall energize - and - start lag pump. both load ind lag pump shall operate together until low level switch turns off both pumps. It level continues to rise when both pumps are operating, alarm switch shall energize and signal the alarm, whore used. If one pump should fall for any reason, the oecond pump shall operate on the override control and It level rise& above ovorrido control, alarm shall signal, where used. All level switches shall be adjustable for level setting, from the surface.. ELECTRICAL CONTROL PANEL Control panel shall have a NEMA IIIR weatherproof enclosure. A lock ha3p shall be provided on door. A circuit. breaker shall be provided for each pump pnd a magnetic starter with 3 lag ovorlo&O protection for three phase operation. or I log overload protection* for single phase operation, shall be supplied for each pump. An alternating relay shall be provided to alternate pumps on each successive cycle of operm Ion. Starters shall have auxiliary contact to operate both pumps on overrido condition. An Intorl"k relay shall be provided to automatically ro-connoct"tho control circuit In case of circuit breaker trip on one pump. "-O-A switches and run lights shall be supplied for each pump. Terminal strip shall be provided for connecting pump and control wlro#. Additional terminals shall be provided to connect alarm. A -transformer shall be supplied to give 24 volt control circuit. Panel Model No. 11 listed. Panel shall have relay with dry controls for alam.telem. connection. CHECK VALVE & PIPING The discharge piping shall Include a HYDR-0-MATIC ball check, valvq with hydraulically sealed discharge flango and a gato valvo for each pump. Discharge from station shall be filled with two NPT couplings. All piping external to the station shall be furnished and Installed by the contractor. SUMP BASIN Thu factory fabricated basin, whore furnished, shall have an Inside diameter of loot and Inches,. and a, ocight of foot and Inches. Tho'b#61n cover shall be Inches 0.0. and — Inch thick. Basin, It stool. and cover shall be sandbloatod Inside and outside to remove scale, slag, rust. etc., before pointing. Basin, It stool, shall bo coated inside and outside with Ur base epoxy point f9r cor- rosionreal6lance. See plans, HYDR-0-MATIC Pumps RESERVES THE RIGHT TO CHANGE SPECIFICATIONS OF MATERIALS USED IN ITS PRODUCTS WITHOUT NOTIFICATION. HYDRaDeMSTIC" PUMPS' A Division of Wylaln, I'no. ftel Office Dox 327.419/2$9 IM 0srernont a Ikney Roods. Ashland, Ohio 4400 CAnum — Wrlwn Cw6w@ UiL one. in smi D&. arsiopwN anieft LaT IGS- Inkonsdaftl "*6 — A04" Ohio ToWs 01442 ME m m ON Most trouble -free control ever designed... Bulletin,710.1 C C.'' FOR USE IN SEWAGE AND PRACTICALLY ALL CHEMICAL SOLUTIONS! %TENT PENDING ON POSITION OFF POSITION 900 MERCURY ,SWITCH LEVEL CONTROL N VENTED CORDS 0 DIAPHRAGMS N #&I MECHANICAL SWITCHES * #49 CLAMPS * NO SUPPORT RODS * NO 14OLLOW FLO ATS Mercury tube switch is sealed in solid poly- urethane float. Weight outside float holds switch at any de- sired height in sump. Designed for over one million cycles of oper- ation. Solid polyurethane float makes switch leak. proof and shockproof. .39oo REPLACES ... ROD TYPE FLOAT SWITCHES, DIAPHRAGM SWITCHES, AIR BUBBLER SYSTEMS... INSTALL AND FORGET! HYDRsOmMIFITIC PUMPS -SEP-13—'%- -F�L' 15,1 A.SSEF. HIU+-TECH TEL rfj,, 12�— 9304 P01 0"'T"'E' F 1L. E H 4-mq MROWN-ROWANT COATMO WASSHR HIGH-TZCH COATINGS, INC. ACSIXILS TRANOMITTAL PAxo (206) 850-3098 VATZI TO COMPANY ADDRESSa TOTAL NUMBER OF PAGES (INCLUDING THIS.C.OVER SHEET) —At— REPLY IMQUESTEDs YES. BY ?AX YES, gly PHONE NO 0 v 00418, ggo L49 #103 - Xqr4, WuWnqW WU vi TEC 1 L !,41,1 -1 6 -7 #-TD4 F02 EP-13-'go TH '� : -350-7�%- j 15:12 U)-��R3SEF HIC*+- * - 20 Y"f Aw w I "ow SEATTLE'S LARGEST SEWAGE PROJECT' For I 96a "tit " I iz m 0 A T I q 0 s AVERAGE T EMPERATURE , 34 deg. F SEP-13-190 THU 15:173 SEP HiGH-TECH TEL T I H 4mov 0 A T I N 0 5 M M (800) MC PAYNT PRODUCT'DATA D E * Single-oomponent, moisture-cu ring, high solids urethane coating V Chemical and sulfide -resistant concrete coating P Cold, damp application tolerant coating 0 High solids, VOO compliant coating N tta_�4 P013 a Sealer for interior of now concrete sewer pipe, manways, or vaults, U 0 Ohemlca,' and sulfide -resistant protective coaling for concrete Is r and rneW . Surface -tolerant coating for darnp or poorly prepared surfaces Mixed with aggregate as sealer for stress crackS Single component - no catalyst mixing errors Can be applied in cold, damp conditions - at humidities to 99% A D 0 Can be applied at low tempamiures - to below treezing V A 9 Typical urethane abrasion resistance and WI -around N performance In harsh environments A e ',Brotidast ranoe of wet charnical resistance E # Superior adhesion to concretes and most surfaces C46be 901Y re paired VOO O'O'mpliant i . . --H TEL 140; 206-35, 7 #'304 PO4 SEP-13-*50 THU 15;14 16 15SER HJaI-TE - C e GdW by valtime: 62.0 11.0% T Moat; 8's 10.1 lbs V00: Lou ftn 3.5 balcal CaveMs all 2.0 mills OFT, 424 H21aal N fteagability., Anytime aftar 2-4 hour mln!mm, and baforo 24 hours Teniferadure reshftnte: 285cF continuous A Fluh pokt: Abovs 834' F L Cure tinw., Minimum 2-4,hours for to-cout or light traffic. Cura times v2ry with temponitura and 0 hurnldfty� A 'Chemlcal residance: PH 2-12, H29, H2804- rnost aMs and basea, and most solverft T Shelf Ift 6 months from date of thipmeM In unoponed o6ginal containare storod at A ton"rawres below W F P All ourfmas muiet be *loan eM free *f any grease. dri or exoesalve ahalking. UI on conwate and deal, use swlei) Or brUsh off blast. of Wid fth on WnMte- R A F R A A On Oastic, fiberglass, acrylic, or gaboat,sand fightly and wipe wkh solvent. 0 T Note: MO-OmW will adhm to nearly, any ovdaw even Mhmt pMer surtwe pf"* E I 6m. 4 Is tMetant of amp, ristati, armlity eurram: howwor, gmd prm000 dbwas fftwing 0 Me abm Momkn when po&Alo. N A A UN MC—TMfIrler Only P a Use spray, roger, or Wush. F I In most tzew apply a single coal of 1.5-2.0 mils DIFT. Allow mInknum 2-hour cure between L I 005to. 0 1 Can be Med with aWegato and scrubed Into stress CMM A T 0 As an arid or suNkle rewstant coating on ooncrete, apply two com af.2.0 mIIs-DFr per coat. 0 ThW aWing can be wetted or Immertied In as We as 1-2 houm, Nolet Wrim MID Welhanes nlay be applied to dmp Surfam at " N h hmWlt6t, Av*d applluWan mr ubYbv&wwtdrW&urpjW�xuIwaw, AvuWdpphVxdampurw N ; or mW bn& Into ft paint rup'aawy for lars t,*4*d& of fnw vv;*mut usIrm mwv Ralfd. I"*UA0A-M Wafer �nk the P&W am, muce 26111-ng, This produd Is for Vidustftl usa only. C A WARNWIS: Vapor and way mW, am hanU. Consuft Me mWerial Bafety data sheel. Use an &Mmvod reo.rator In oonlinod amas when brushing or mIlIng. Use a positive pressure air flow. T hoW when exposed to spray mist or overspray. Protect skIn and eyes from contact. This Y product writains oManIc solvents and polylzocyanates� Do not use I you have a chronic or aftMic to action to Isocyanalse or organic, solvants, WM& HkO-10* COMM Wamts 1% W*x% Ip be t" WM 064M h PWIAI Md wommfinsplp� WMW fth-tem C46OV15 ove sfta%"&,w BuWa exdueW mwe4 In onmoedom Wth 0% prmm shm'i be fimhW, at Wagur �%11-Tedv Ocathq's opdw% Io W[hW W Any W A deftel. but In re 4"ftt taw dw Ov exomkm of 1he I"limbW "t ft, w 5Ix mmlha from dv* dalivvv daw whWvw la aarlitr. 9wees a Wlm tD no* Wawr 4ishrT60 CWnp of #Wh rw-cv?Qmw= so rwilred hun$p Odl bar 04w from rownry ur4ar this WAMOW. R WOW HWI-Tem Gnaros maws no ww Wwwtot x"WrMi"S ft Arm=. NO amor W2rWd". ~W **Mfts' IrepRod"Or mu'00y, A auch w wwwfim of ~dwinbRity of %%us bt a paidouloe puopw' "W **�/' In r* 4"It 00j) %VAOV coaorvs Do mwd tv cWAaqAnW or lnddmdW dumqu AM n=mmmWon orvigWtion r"nq b ft ma of ft pro&xm made by Wassas Hio-Tw� GtadfVc wholhor in to tomnreft; lwaluro' or In nwponse, to epedfia MqLdey, w a&w4vol", 4a bmed CM datat be4eved W be refiaWej m wroft6f j the pffid Lien dtnd IMNwrMlon age I A tandod W Y use by ftwo haft m;.41W WD wW knoo-how In Ow IrxfvuVY, &W II'vetwe It la V,- Gum to Buguly Iwo of thea6lawilty of ft amdum Ior h own paUhr um and il Md ba deomd Ihw. "t ho dons so, WHIs sola 09cradan ar'so ML VartailloWn er*lronrW� dumom In pwq:M" 91 V", or oxo%vwon of,%% rMY cum UMCWGkWWyM.V1W' UMM' OP UARIMY - Wewli HoWlIfy an any &im of soV iW, WWlnq 04" boW vpon Wssoft %Q11genas of DM ilebli?y, fm chall inm mm emmilhtpurthwe pfta Jhmw6k a Obe poodw4w &o p&K AA�*O whkh IW6.-60 0 446 6WIM, �A A6 &'401: "ASaP be 16WO IV MA"RUG"diLl Of IMid*Aqft1 OW -A PIP / 3 (1 16-41e, CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: C) Public Works a Planning - Parks and Recreation o Engineering May 14, 1991 S T nm E LE'-f F- i Bjorn Thuesen Bjorn Thuesen, Inc. Realtors 322 Main St. Edmonds, WA 98020 Re: City Park Condominiums, 430-434 3rd Ave. S. Engineering Inspection Dear Bjorn, LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR On May 10, 1991, an engineering inspection was conducted at the subject project site. Listed below are the deficiencies noted: 1) Parking stall width in front of building "B" not to City standards. 2) Two (2) parking stalls behind and one (1) to the west of building "All not to City standards. 3) Drain plug at base of stairs to garage, building "A", plugged. 4) Clean asphalt off of all manhole and utility covers. 5) Clean out sewer manholes. 6) Install locking nuts on manhole covers. 7) Grout around pipes in valve vault. 8) Grout all catch basin and manhole concretee extension rings. 9) Clean out debris from oil separator. 10) Downspout on south side of building "B" not connected to tight line. 11) Downspout at southwest corner of garage to building "C" not connected to tight line. 12) Install splash blocks at all downspouts around building "C", which is not connected to tight line. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 0 0 Bjorn Thuesen May 14, 1991 Page 2 13) Secure chain link fence to posts. 14) Provide exterior lockable latch to gate at lift station panel enclosure. 15) Enclosure around lift station panel not wide enough. 16) Lift station and system not tested. 17) As -built drawings required. 18) Clean out all catch basins. 19) Lift station telemetry not installed. 20) Repair defective areas of asphalt paving in front of building "A". 21) Parking stalls south of building "B" and building "C" garage (next to concrete retaining wall) not to City standards. Because the olef station and associated equipment have not been tested to date, a separate punch list may be required. The test on the lift station, scheduled for this morning, is only a partial test and is not to be construed as a final test or acceptance of the system. After the telemetry is in place, a complete test will be conducted on the lift station. Before we will consider any additional occupancies, the lift station must be totally operational. We feel that four (4) weeks from today is sufficient time to get the system completed. If you have any questions, please call me. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt CITYPARK.APT/TXTST530 P0 C'_ Al bbrts 0 0 STRP,-',---T FILE M E M 0 R A N D U M May 10, 1991 TO: Mayor Larry S. Naughten FROM: Gordie Hyde, Engineering Coordinator VIA: Bob Alberts,'�A��engineer SUBJECT: THUESEN LETTERS OF 10-23-90 and 12-18-90 The first letter, requesting street lights, has been forwarded to Bill Stroud, Street Supervisor, as he is responsible for ordering street lights if necessary. The second letter dealt with a request to prune maple trees at the City park. Pat Harris, Park Maintenance Supervisor, had indicated a willingness to work with Mr. Thuesen's subcontractor to trim the trees, which is Mr. Thuesen's responsibility. Apparently, Mr. Thuesen's subcontractor has not responded to Pat Harris for coordination of the effort. GCH/sdt THUSNLTR/TXTST530 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS. WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works - Planning * Parks and Recreation Engineering 89 0 9 C� I , D T F I L E May 1, 1991 Bjorn Thuesen President Bjorn Thuesen,Inc. 322 Main Street Edmonds, WA 98020 Re: Temporary Occupancy,request of April 25. 1 Mr. Thuesen: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR I agree that you have made repeated requests for temporary occupancy of your building at 428-434 3rd Avenue South (City Park Condominiums) and that we have refused each time. Each time I explained the project was not sufficiently complete to consider a temporary occupancy. You do not seem to fully understand what our policy is. Let me explain. My staff agrees that I our current policies have not changed regarding inspections an'd occupancy in the past 10 or 15 years. My staff tells me you havelbeen though the process a number of times in the past and do not understand your confusion. That policy is as follows. 1. Once a request is made for "Final Inspection" or "Permission to OcIcupy" the departments involved in the permitting process are notified (the building department is last to inspect). �Each department must grant approval before a Certificate of occupancy is granted. The building department inspection is usually not scheduled until the other departments have conducted their inspection and have approved. 2. If a request i's made for "Temporary Occupancy" the same process is followed by my department. If each reviewing department is willing to release (with or without conditions) the building official may issue a Temporary Occupancy for a limited period an with specific conditions. So if all reviewing departments agree to a temporary occupancy the building official may issue a temporary pursuant to Section 307(d) of the Uniform Building Code (UBC) . It should be noted that the UBC is a model code and allows for local interpretation. section 307 (d) is not a mandate �but offers a method of granting a temporary when justified - thus the use of the word MAY in the text. I o Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan i 1 0 In your particular case, the reviewing departments have not granted permission to issue a temporary occupancy. Engineering and Planning have reported that too much work remains to be completed to consider a temporary. For that reason the building department has not scheduled its final inspection and has yet to determine if the building's life safety requirements have been met. Again, I believe the policy is the same as it has always been. I cannot agree to the issuance of a Temporary occupancy until each reviewing department agrees to allow that do be done. I hope this will clarify the situation at City Park Condominiums. -inpdre Richard R. Mumma CBO Building Official City of Edmonds cc: Sharon Nolan, Rob Chave, Pla Tom VonSchuess Gordie Hyde, En Ron Holland, Wa thuesen.rrm it Coordinator ing Manager r, Fire Marshal ineering Department,-'- er Department 6 0 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works - Planning a Parks and Recreation o Engineering 8 90 - 199 January 4, 1991 Bjorn Thuesen 322 Main St. Edmonds, WA. 98020 Dear Bjorn, FILE LARRY S. NAUGHTEN MAYOR PIETER E. HAHN DIRECTOR In response to your letter of December 18, 1990, 1 cannot authorize the lowering of the park access road adjacent to 430 - 3rd Ave. S. The proposal, as I understand it, would have to be approved by the Parks and Recreation Division, Arvilla Ohlde, Manager. My impression is that changes to City parks have to be approved by the Planning Board as well. I would recommend,. -that you contact Ms. Ohlde regarding your request. I have talked with Ms. Ohlde regarding having the Park Division crews trim the overhanging maple trees. I have given her Steve Gillis' name and number as well. Thank you for your concern. I am always willing to help in any way I can. Sincerely, GORDON C. HYDE Engineering Coordinator GCH/sdt c: Arvilla Ohlde, Manager Parks and Recreation Division THUESEN/TXTST530 A)-)q Al t�firts 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan B16RN 0 INC., REALTORS url� U 322 MAIN STREET - EDMONDS, WASHINGTON 98020 775-1953 December 18, 1990 U r -a F I L E Mr. Gordy Hyde, Engineering Department City of Edmonds 250 - 5th Avenue North Edmonds, WA. 98020 Dear Gordy: We would appreciate if you would consider lowering the City Park road adjoining our condominium development at 430 � 3rd Avenue South in Edmonds, the purpose being to facilitate the access of the Fire Department to our project. Also, would you please have the city trim the park maple trees. where they overhang our project.. We had a bid from our tree man of $300.00 with the City removing the debris. His name is Steve Gillis, at #742-2926. Sincerelv. BT: pn 8 q lz� 9 0 19 0 % CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works - Planning o Parks and Recreation o Engineering December 6, 1990 Bjorn Thuesen 322 Main St. Edmonds, WA. 98020 STM . :CT FILE Re: Release of performance bond money City Park Apartments, 430 - 3rd Ave. S. Dear Mr. Thuesen: LARRY S NALIGHTEN MAYOR PETER E. HAHN DIRECTOR tK-4J-AJ- / &17 /?0 I conducted an inspection of the subject site this morning to determine if your performance bond could be released on the following work said to be complete: 1) Concrete retaining walls 2) Rockery 3) Storm/sewer lines and catch basins 4) Sewer pump station Based on the inspection, the concrete retaining walls, the storm/ sanitary sewer systems, and the catch basins are not 100% complete. Partial payment cannot be made on the above items and, therefore, money for those items cannot be released. I am recommending $1,800 be released for the rockery and $24,000 be released for the pump station. When the pump station is operational, I will recommend releasing the remainder of that portion of the bond. The total amount of the performance bond that I am recommending for release is $25,800. If you have any questions, please call me at 771-3202. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt CTYPKAPT/TXTST530 �� 4 /,--- Al berts I L" 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan BJORN THUESENINC. 322 MAIN STREET - EDMONDS, WASHINGTON 98020 - 775-1953 December 3, 1990 City of Edmofids Building Department 210 - 5th Ave. North Edmonds, WA 98020 Gentlemen: We would appreciate if You would re -inspect the City Park property and release the appropriate money for the improvements installcd last month, for which Puget Sound Bank has a hold- back. The improvements installed include a concrete retaining wall, rookery, storm and sanitary sewer, catch basins (some of which are temporarily covered by dirt). The pump station has been completed except for a cast iron lid. Please mail Your letter of release to: Regan Belgard Puget Sound Bank 1325 Forth Avenue, llth Floor Seattle, WA 98101 with a copy to the undersigned. We would appreciate it if you would do this Post-haste. Sincerely, BT/js BOND RELEASE FORM CITY OF EDMONDS 1�2 DATE: 1,3A?L TO: ENGINEERING DEPARTMENT LYLE CHRISMAN PLANNING DIVISION ED SOMERS FROM: Jeannine L. Graf, Permit Coordinator PERMIT# ADB# PLAT# PROJECT ADDRESS DEVELOPER/CONTRACTOR TYPE OF BOND TO BERELEASED BOND DATE POSTED BOND EXPIRES Please field inspect for-the,release of the subject bond......If there., are''. outstanding requirements, please note in the space provided.' CR -3 o 2 A 171, 3 4. BOND APPROVED FOR RELEASE DATED BOND NOT APPROVED, SEE OUTSTANDING REQUIREMENTS ,:P�- /9z- DATED COPY TO FILE COPY TO DEVELOPER/CONTRACTOR BONDREL/TXTRECEPSeptember 10, 1990 LOVELL-SAUERLAND & ASSOLft, INC. 19400 33rd Ave. W. Suite 200 LYNNWOOD, WA 98036 1UEU`T* (IF TURSEDUMIL Phone (206) 775-1591 I&,* W —SM A % 0 2 VHL ST R E V r WE ARE SENDING YOU eAttached 0 Under separate via - I __% • Shop drawings %eprints ns • Copy of letter El Change order F-1 .AlEg A&6 110. NO. ATTENTI��., the following items: 0 Samples El Specifications DESCRIPTION S wrn' T 001 NINE F.— FINE FINE MINE MEN M, pm"�_- 10M.2,00 FINE MINE FINE ME IN THESE ARE TRANSMITTED as checked below: 0' 'tg_For approval El Approved as submitted 0 For your use 0 Approved as noted WEl A requested El Returned for corrections For review and comment F-1 0 FOR BIDS DUE 19 REMARKS • Resubmit -copies for approval • Submit -copies for distribution El Return -corrected prints El PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: PRODUCT240.2 1�1m,Grdm,MmO1471. It enclosures are not as noted, kindly notify us at once.. City of Edmonds (71NTER-OFFICE CORRESPONDENC TO Ail . __ix - FROM DATE SUBJECT jjj�W 6Z� 91z� RECEIVED 8EP 081989 PubLIL wvvi%t%q� STREET FILF A00 rocom -j7Q&/ m a -19Y ll ?A ou e V- m Oo oze- Ar JiM--- MAY TP. Cirf 0 S T. A -40 11 iq r.w" A-0 7:q f) dOpw-&"mo Lut es tJ _Ul ul ku;D 13014lb/flick C) -rL/ C-0 PC -- -------- 0 1 - --- / \ \ . .400 STREETTILE 66,v Zet PN Ile( All M-A o I?- Z I 2--rP -7 ?-,,) T/ . -6.-A 0 PS -21- 6ri. ("p 1 7 ell CD QD STREIVI. TO FROM: M E M 0 R A N D U M January 20, 1989 Leigh Francis, Associate Planner Planning Division Gordy Hyde, Engineering Coordinator Engineering Division SUBJECT: FEBRUARY 1 ADB AGENDA ITEMS Item ADB-1-89 No problem ADB-2-89 No comment ADB-3-89 OK; no sight obstruction ADB-4-89 No comment ADB-5-89 Signs OK; question use, as discussed in CRC meeting ADB-6-89 No comment ADB-8-89 No comment ADB-9-89. Sign as it exists creates a sight obstruction. Would be much better if sign could be placed in planting bed on west property line. Change in parking no problem, except rhody in east bed must be relocated or replaced with plants that can be looked over. ADB-114-88' Chain and lock on alley access is not a requirement. Cross sections of site should be provided to assure us of parking lot grades. ADB-122-88 ,-/ADB-66-88 - GH/sdt FEBADB/TXTST530 Construct curb, gutter and sidewalk along frontage of 201st St. S.W. for future 36' road section curb -to -curb. No comment C) Q) A X) I-- S � �­-! 11 E (Irlo�clv,r lirll-lvl)A ler - ��F, 1vr e-P1tm1r1vT- /Y 7,7--AJI IrAl �1<,7r- /-f. AIFVV c r/1011 ("1144'eir t?,12 /vr �,rlcl I I tivl- 111V-2-7-ff- Ntil" Ifit'101Ve'7� z3 At)4-?)-J1-YF (l//d(v(/r IAI /t�-rnr //-I p 11WIA Alo ,4(11—ft /�- z�. X/ (11VIT- '5ml-rmt-) 7T) PI,,VA,12 44/ D eC IA-r�F 7Z) SOO Ca, A' 4 CIV17- gjC1ja1f4 ( SO f DRAINAGE CALCULATIONS 13-Sep-89 (Snohomish County) THUESEN APARTMENTS, LSA #1076 �') " ";'- �--' - '. , .. - -f , - 1 .295 Total area, acres Time of Concentration: Cummulative "Flow length Vertical Ground Type Runoff Time of Travel Time feet Drop Slope . Cover Velocity Travel 5.000 13 1.2 9.23% paved 6.23 0.03--" 5.03,- 1 43 2.0 4.65% paved 4.39 0.16 5.20-- 1 149 9--- 0.0 07,-8 -.0-81/ paved 5.82 0.28 1 13 1.0 7.69% paved 5.67 0.04 5.52 1 Piped: (based on pipes flowing full, no pressure) I en g t h : d i a : SI ope: n : V : t i me total R: 72 1.00 8.19%* 0.024 /. 7.1 0.17' 5.69 0.25 140 1 .00 4 . 2 1 '/. * 0. 024 5. 1 0.46 - 6. 15 0. 25 15 1 1 00 3. 33%* 0. 012 / 0 . 0 3 " 6. 1 B 0.25 Time of Concentration, T(c) minutes 6. 179 Design storm, 1(10yr) , - - - - -- - - - - - - - - - - Itc in/hr = 2.316 - - - - - - - RETAINED: - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - Area of retained flow, Ar acres 1.295 , Ar sf 56400 Exist runoff coeff, by proportional areas: C impervious areas, < 76.00% approx. 0.90 x 42864 landscaping, > 24.00% 0.20 x 13536 other 0.00 x 0 o t h e r 0.00 X 0 Total Area, sf 56400 Cer 0. 732 Flow off ret. area, ger cfs= (Itc x Ar x Cer) = 2 . 195 Compare this flowrate to the capacities of all pipes listed above. Pipes are adequate. Trapezoidal channel flow calculation: 2-year storm intensity: Flow from 2 year storm using modified rational method= Friction factor 0.030 grass lined swale Side slope = 3.0 H : IV Channel bottom slope = 0.50% Channel bottom width = 4.000 feet Depth = 0.292 feet, Top width, wetted 5.750 feet Area wetted = 1. 422 s f Wetted Perimeter 5.845 feet Hydraulic Radius, R = 0.243 Freeboard sideslope = 3.0 H - IV Top width with 0.750 ft freeboard included 3.5 inches Calc'd Discharge, 0 1.95 cfs reqd flow: Calc'd Velocity, v 1.369 fps,// preferred 2.008 in/hr 1.903 cfs_,-- 10.250 feet 1.903 cfs 0.500 fps max Q: 5. 54 3. 97 7. 07 0 EXAMPLE: The dashed line shows that the resis- tance of a 6-in. standard elbow is equivalent to approximately 16 ft of 6-in. standard pipe. NOTE: For sudden enlargements or sudden contractions, use the smaUer diameter, d on the pipe -size scale. Head loss through check valves varies with types manufactured. Consult with manufacturer for correct v414PP. Appendix: CHART 35 RESISTRNCE OF VALVES AND FITTINGS TO FLOW OF FLUMS Globe Valve, Open te Valve -3000 losed - !/2 osed -2000 IA C I ed - Fully en 1000 48--50 inn 500 42—__ �%ngle Valve, Open Standard Tee 36-- 300 30--30 200 24-- Square Elbow 22- 20--20 00Q)_ 18 16- Swing Check Valve, Fully0pen U) 14— Bor rance -50 (D 12- cn �j 30 9__ -20 Close Return Bend uddenEnlargem t Cn 7-- 0 4 d/D- 6 d/D-% 5­5 In Standard Tee V2 - Through Side Outlet 4-- Ordinary Entrance -3 M 3­3 -2 'Ei Standard Elbow or run of 0 Tee reduced 1/2 -2 -!M �e. �ntrct,,�,- '/2 d/D-1/4 d/D-1/2 - 11/4- Medium Tw-eep Elbow or d/ D - 1/4 -0.5 run of Tee reduced 1/4 -0.3 3 L�� /4- - -0.2 45' Elbow Y2 Long Sweep Elbow or -0.1 run of Standard Tee -0.5 Courtesy of Crane Co. 0 77 CHART 4 Table of "C" Values for "Hazen and Williams Formula" CONSTANT TYPE OF PIPE CONSTANT TYPE OF PIPE 155 Driscopipe 110 Ten to twelve years old cast iron pipe 140 New steel pipe or tubing Vitrified pipe Glass tubing Spiral riveted steel, flow with lap Asbestos cement Galvanized steel 130 Copper tubing 100 Spiral riveted steel, flow against lap Ordinary brass pipe Thirteen to twenty years old cast Cast iron — new iron pipe Cast iron — tar coated but new Galvanized steel — over 5 years old Cast iron — fully cement lined Cast iron — tar coated over 125 Steel pipe — old 10 years old 120 Wood stave pipe 90 Twenty-six to thirty-year old cast Concrete pipe iron pipe New wrought iron pipe 60 Corrugated steel pipe Four to six years old ca,�t iron pipe Fitting Eres sure Dr p: Listed below in Chart 5 are various common pi.iping system components and the associated pressure Ic)ss through the fitting expressed as an equivalent length of st iraight pipe in terms of diameters. The inside diameter (i.ri feet) multiplied by the equivalent length diameters clives the equivalent length ('in feet) of pipe. This equivalent le,ngth of pipe is added to the total footage of the piping systenn when calculating the total system pressure drop. These equiva.lent lengths should be considered an approximaticin suitable for most installations. CHART 5 FabricAted Fi,tting Equiv. Length Runnin g Tee . ................ ............. 20 D Branch Tee . ..................... ............. 50 D 900 Fab, Ell ................. [][�� ........ 30 D 600 Fab, Ell ..................... ............... 25 D 450 Fab, Ell ......... ............. ... 4�� .......... 18 D 450 Fab, Wye! ................. ................ 60 D Conventional Globe Valve (Full Open) ... ...... 350 D Conventional Angle Valve (Full Oper-J ... .............. 180 D Conventional Wedge Gat(� Valve (Full OperJ ..... I .......... 15 D Butterfly Valv(� (Full Open�l ............ ...... * , * , , * , * '40 D Conventional Swing Chec.k Valve ....... t .............. 100 D (See Appendix fc)y further data or i resistance of valves and fittings to flow.) 12. kinetic energy in the water in a pipe because of its mass and velocity If the velocity is opened and closed slowly Even greater water hammer can be caused by air entrapment. never be allowed to exceed the pressure suddenly reduced, as would occur by the closure of a valve, this energy cannot be System design should provide ways of preventing air entrapment. rating of the pipe. NOTE: To allow for cyclic loading effects and surge, Simpson Wnuick )" sily absorbed. The instantaneous shock may generate excessively high pressures Pressure and Surges: Pressure surge may recommends the working pressure be limited to 70% to 80% of the pipe pressure rating. known as water hammer. This effect becomes be calculated from Figure 1. The combination of static pressure and surge pressure should greater as the velocity is higher and/or the valve closure time is shorter Valves should be W10city F&et per Friction Head Friction Loss Pounds per Velocity Feet pe, Friction Head Friction Loss PoundS Velocity Friction Friction Loss Velocity Friction Friction Loss Gallons Second Feet Square Inch Second Feet per Squate Inch Feetper Second He d Feaet Pounds per Feet per Head Pounds per per 2% In. Square Inch Second Feet Square Inch Minute 1% In. 21n. 31n. 1 0.27 0.02 0.0087 0.17 0.01 0.004 0.68 0.96 0.14 0.25 0.059 0.104 0.44 0045 0.020 0.30 0.025 0.011 0.20 0.01 0.0045 2 5 1.36 0.47 0.20 0.61 0.87 0.08 0.035 0.42 0.035 0.015 0.28 0.014 0.0063 7 2.04 1-0() -- 6-43 1.30 0.16 0.33 0.069 0.59 0 r'a 0.40 .0.02 0.009 10 2.72 1.71 0.74 1.73 0.57 0.14, 0.25 0.88 0.13 0.056 0.59 0.05 0.022- 15 3.40 2.59 1.12 2.16 0.86 0.37 1.18 0.22 0.095 0.79 0.09 0.039 20 4.08 3.63 1.57 2.60 1.21 0.52 1.47 0.34 0.15 0.99 0.13 0.056 25 4.76 4.83 2.09 3.03 1.61 0.70 1.77 0.47 0.20 1.19 0.18 0.078 30 5.44 ' 6.18 2.68 3.46 2.06 0.89 0.27 1.39 0.24 0.10 35 1.59 0.31 0.13 40 6.12 7.69 3-33 3.90 2.56 1.11 2.35 0.81 0.35 6.80 9.34 4.04 4.33 3.11 1.35 2.65 1.00 0.43 1.78 0.38 0.16 45 8.16 13.10 5.67 5.19 436 189 2.94 3.53 1.22 0.53 1.98 0.47 0.20 50 9.52 17.42 7.54 6.06 5.80 2.51 1.71 0.74 2.38 0.65 0.28 60 10.19 19.80 8.57 6.49 6.60 2.86 4.12 2.27 0.98 2.78 0.87 0.38 70 10.87 22-31 9.66 6.92 7.43 3.22 4.41 2.58 1.12 2.97 0.99 0.43 75 12.23 27.75 12.02 7.79 9.25 4.01 4.71 2.91 1.26 3.17 1.11 0.48 80 13-59 33.73 14.61 8.66 1124 4.87 5.30 362 1.57 3.57 1.38 0.60 90 5.89 4.39 1.90 3.97 1.68 0.73 100 10 in. 7.36 6.65 2.88 4.96 254 1.10 125 8.83 9.31 4.03 5.95 3.56 1.54 150 0811 n n-)7 0, 0 1 P 1031 12.40 5.37 6.94 4.74 2.05 175 1 05 004 0,011, 7.93 6.07 2.63 200 1 0 0022 12 in. 9.92 9.18 3.98 250 1 0075 0J),313 1 0-1 041 0017 300 68 009 0039 1 � 19 O�W 0 Q 17. 350 89 0. 11 i O.M 1,34 0.05 0.022 400 2 !0 0 14 O�06 i 0 06 0026 450 4: n 2c) 0 0 13 n rt�,r, 500 750 ig "A V12 9 6 0�45 1000 n i,� i!-) i 06 n,ii-1 -1-17 0:)o 1250 S '3E i.8i 0 78 5,96 0 79 n 34 1500 i C1 13 2 7�1 19 7.45 1 �o 0-52 2000 2500 -�-0-00 1 66 8 91: 1 C�7 072 10,43 2 2:1 -1 - o T 96 11,92 87C 3500 1341 35-1 1 53 4000 Note: A slide rule with this information is available. - 4500 5 I t,,:> / 54 C?fL If R)A4P Z 0 U W. 0 W. CItY OF EDMONDS COMMUNITY SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT A. * Owner: Name Mailing Address City State Zip __9W 010— Permit No. YIssue Date ct B. 9 Contractor: "�2' k r 6 U/ W 4 r 4�f e"' _1�tiii Addrei ol!hp e__ , J ( x _.' '.0,/ , City st-ate zip State License Number Tereph6ne Nu-mber C. 9 Address or Vicinity of Construction: !q 3 y Type of Work to be Done: (es-2 4 :Q2 S?�JA 1'/ A- - I D. 0 Work in Connection With: 0 Sub or Plat El Single Family El Commercial Multifamily E. *Pavernent Cut: T Y El N F. 0 Size of Cut: 3 X 3 0 APPLICANT TO READ AND SIGN 0 City Projects 0 Utility INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. C • Restoration to be in accordance with City Code. 3"T R ` Er' � L"­` - 8�1'1 I LEE- • Street to be kept clean at all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Owne7r or'Contrdctor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: PERMIT FEE: _�(o - 0 Q Time Authorized: Void after days. Restoration Fee: -_ Special Conditions: C4%d*xx_- I-V4.t'4 73M Receipt No.: _Z0 I I 9 S 70 Va4v t V- ISS1 Fund I I I Fee: 199 .0c) _T1 S97- CA>4%. C&M_ Street Cut Dimensions: 70— S%�p "uc— RELEA��.. — Date INSPECTED BY Date — IL SftA-_R&> NO W6RK TO BEGIN PRIOR TO PERMIT ISSUANCE rng. uiv. IVIUILII 1707 RIGHT OF WAY CONSTRUCTION PERMIT ROUTING FORM CONTR ACTOR (2A DATE PERMIT RECEIVED WORK ADDRESS SIZE OF CUT: 3 X30 DATE TO ROY WHITCUTT FOR REVIEW: FROM-ROY TO PUBLIC WORKS: PUBLIC WORKS DATE SENT COMMENTS: REVIEWED BY BOBBY MILLS REVIEWED BY BILL STROUD REVIEWED BY ARCHIE BRENA FROM PUBLIC WORKS, ROUTE TO ENGINEERING_ ENGINEERING DATE SENT COMMENTS: REVIEWED BY NOEL MILLER REVIEWED BY DAN SMITH Lf IqA r?e7 FROM ENGINEERING TO PLANNING(For ALL Above.Ground Work) PLANNING DATE SENT REVIEWED BY JOHN BISSELL R.ECE I v Ej) JUN 15 1990 PUBLIC WORKS �Rzczjvrp ) DATE PERMIT ISSUED �d I q /q 6 PERMIT # qO - 2-00 (2�) - Rev. 11/14/89 lfc R/WFORM/TXTRECEP JUN 18 ENGINEF811VI, , 890 . 19 9 - CITY OF EDMONDS kEcE:ivE.:r) 700 MAIN ST. e EDMONDS, WA 98020 - (206) 775-2525 PARKS AND RECREATION DIVISION APR 3 0 1990 April 28, 1990 Mr. Bjorn Thuesen 322 Main Street Edmonds, WA 98020 Dear Mr. Thuesen: F NIP, 1 N I F r D I Nhl� STREET FILE LARRY S. NAUGHTEN MAYOR Since construction commenced this past week on the property North of City Park, a dangerous situation has arisen regarding construction vehicles parking adjacent to the park road exit. This is creating a blind area where drivers exiting the park cannot see vehicles traveling on Third Avenue. I have discussed this with the on -site Project Manager but the situation still persists. Could you please discuss this with your Project Manager and all subcontractors doing work at this location? I would recommend holding vehicles back at least forty five feet on either side of the exit. Your cooperation will be greatly appreciated. Sincerely, Y4— "N) Pat Harris Park Maintenance Supervisor cc Arvilla Ohlde r-D6rf--Sffi`th-­"' , / 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 0 0 Lovell-Sauerland & Associates, Inc. Engineers/ Surveyors/ Planners/ Development Consultants City of Edmonds Engineering Dept. 250 5th Ave. N. Edmonds, WA. 98020 Attn: Jerry Hauth Dear Jerry: CIN I-, 16T ;'N' FILE 19400 33rd Ave. W, Suite 200 Lynnwood, Washington 98036 (206) 775-1591 Seattle: (206) 340-0830 FAX: (206) 672-7998 March 30, 1990 LSA File No. 1876 As you requested yesterday I have verified the grading quantities on Bjorn Thuesen's City Park Apartments. The calculations in our file show 2631 cubic yards of cut and 937 cubic yards of fill, based on average end areas of plotted cross sections. Therefore the 3,600 cubic yard figure in the grading permit application is accurate. I have also modified the drainage and grading plans to provide dual culverts in the swale as requested. one copy of each of these sheets are hereby forwarded. Let me know if there is anything else you need. Sincerely, Craig Campbell, P.E. STREE-T FILE A/ t�cs A2 -1 -;�621A ,J� 1144, ------ ---- SEP-10-190 MON 10:54 H I GH-TECH #297 P01 NASSER HIGH-TECH COATINGSt INC. FACSIMILE TRANSMITTAL FAXi (206) 850-3090 MT COATINGS RECEIVED SEP 10 1990 WNEF.RiNr, DATZz TO., FAXvL CCOWANX 2 PHONE I ADDRESSs I or PROXI PHONE.- TOTM NUMB= OF PAGES (INCLUDING THIS COVER SHEET) REPLY REQUESTED: YES, BY PAX YR8, BY PHONE no J14 jvu�� 1�6��T5 SEP-10-190 MON 10:55 V SSER HIGH-TECH TEL NO:206-85 It 7 9297 P02 VHIN.T;ECH COATINGS (800) MG PAYNT PRODUCT DATA Wasser MC -Tar D E Singl6-component, moisture -curing urethane C R VrSthanew topcoat 06tor: 0 P 0 laCk T I High solids, VOC oompliant coating 0 IN Any use where steel or concrete is immersed or exposed to splash, zone, high humidity, sewage, or buried environments U Any use where coal tar epoxy has been used and a better finish Is desired Any. field repaint of the above uses where cold, damp, and/or high humidities limit the use of typical epoxy or urethane Single Component - no catalyst mixing errors Can be applied In cold, damp conditions - at humidities to 99% A Can be applied at low temperatures - to below freezing D Superior to coal tar epoxy for heat re3l3tance, chemical V A resistance, flexibility, weathering, and resistance to cracking N Outstanding resistance to salt and fresh water in immersion or T splash zone A a Typical urethane flexibility and abrasion resistance E Typical urethane resistance to Cathodic disbondment C*n be Immersed In one hour - means very short down times Zasllyrecoatable, easily repaired V6C oompliant *:-P-10-190 MON 10:56 H I D-i-TECH TEL NI 7 #ZI rl-�I 41 WAGGIR H12H-T!&H CO&YINgl Costing Specifloation 126 0oal jar epoxy, and other coatingswith MO -Tar. 1. Purpme: To provide an improved altornattya to typical ter or epoxy ter coatings, and one that also It" improved oppiloatlon and curIng propertleiL 11. Sufte PmPorstiom A. Over bare steel, use SSPO-SPI 0 Near V41119 Blast for Immaralon, and SSP0-SP6 Comrnerclal qlagtfo(norrnal. non-Immeralon or burladapplicatlons. 9. on concrete, rernove excess dirt, grease, and chalk by sweep or waleFS—lasting7—N C. Over old co"S, use sweep blast or hlGh pressure water bl&sL 0. Over galvanized steel, surface must be free of grease and oil. r-. When used over MC-Zlno, Use 2-4 mils DFT (10ty FlkTi Thicimem) of MOO= F. Over old t" adherent epoxy tar, use power wash of Solvent wIPG- Note-, Tras Product and most Wamrurethanes are des4nedto adhere to poorlyprepaW surfaces such as old Paint, tightly adherent mt, and poorly Gisaned surface6; however, lost patches Mid be made when good surface preparation 4 not pmlble. Ill. Costing Apply one or more coats of Wasser MC -Tar by brush, rolfer, or sprety at 4-8 0 Fr per coal. 1. Use Mo-Tar at 10-12 MIS to replace 16-20 018 typical oul tar epoxy on steel or conc—m-ft.- 2. Use a-12 mils MC -Tar to replace 40.0 moo hot dipped tar on concrete, or burled or non- -bW49dAUWL----- 3. Use 6-10 mils MC -Tar to replace 40-80 mlls hot dipped IN on galvanized surfaces. —C� SEP-10-190 MON 10:59 4 r R HIGH—TECH TEL N0:27N�-8511C-7 #297 P07 M YOMRQ�: NION-7 EON C 0 A T I N 0 8 p)[PRaMbn SUM& Pir"avallon First Coal Second Coat Tnlrd C oat Material DFT MaterieJ DFr MaterW DFT (so noto 1) (am nm 3) Gensirall ImmorM In fresh or Saft Water 10 MO-Zft 3 Me -Tar 6 MC -Tar Previously PaInted P131 MC-21nc Spot MC -Tar 4 MC -Tar 4 Whavel Color Is Required 10 mc_zinc 3 MC-Ferrox 8 3 MG-Ferrox A Gm% Lao" I D MC-Zft 3 MOTar 6 MC -Tar Whom Color In Required 10 MQ-Zft 3 MO-Ferrox B 3 MG-Ferrox A Ponowsho 10 Me-Zft a Me -Tar ID MG -Tar 6 RodU gaialn= and Irmah ftoko 10 mo-zft 3 MG -Tar 5 MQ-Tar 6 8=1 Enp000d to 8=00 PH 4-11 10 MO-ZlIne 3 IVIC-Tar or 6 MC -Tar or 6 MC-Forrox B 3 MO-Ferrox A 3 PH 2-12 10 MC-Ferrox B 3 IVIC-Ferrox B 3 MC-Ferrox A Ouncrem 019Mr BT IVIG-Tar 6 MC -Tar 6 Over Old Epoxy Tar FF1 IVIC-Tar a MC -Tar 6 P1001111no Buried 6 MC-Zlnc 3 IVIC-Tar 6 IVIC-Tar 6 Immmed In Fresh or S&N WRIer 10 MO -Zinc; 3 MC -Tar 6 Me -Tar 6 Above Gmrtd 6 MC-Zlnc 3 MC-Ferrox a 3 MC-Ferox A 3 Prevlou* PaInted PID1 MO -Zino SW MC-Farrox B 3 MC-Fermx A 3 To ROPIM Hot Tar PPI MC -Tar a MC -Tar 6 "AN Wamr systems a rewirnMend lor use wfth cathad r prow T Ion. UNote: I - Durkloo Fropora0m & Whom blestIm Is done the number Is the 88PO-SP number. Is. SSPC-$156 Commercial Is 6� b, Where old coating Is not removed the number will be PP1. This I& swoop blast or power wash with spot cleaning or blasi:lng of apot commlon. c. Slact TracK cr ShMIng of carmnno wul tie G.T. 2. DM hi the dry Him thlakrms. Carmult tho lrdMdual deta eheot for oovorage at thlo DFT SEP-10—'90 MON 10--56 '06� H I 3-1—TECH TEL NO;206-8511#-? #297 P03 IllOde by volume: 01.0 12,0% ww. 10.5 * 0.3 W H 0 VOO: Lou ftn P-0 lbelgal N Covemp at 0 MOS: 1 W it Recoat011ity: Anytime Mter +6 hours A L Terriperaktre resistance; Wet, 1001, F corrdnuouB; dry, 240a F contlnous D fifth mW: Above 9V F A T Shoff We: a mordhe from date of shipment, In unopened original containare otored at A temperatures below 050 F P - Over bam 9", Lee GOPC—OP1 0 Near White Blast for Immersion, wwd 8$IV-$P6 Oom morofal R Wast for normal, non-Immerelon or buried applications. M - On concrete, mmove *No*" dK grea", sM ohalk by oweep of water bl"Ing. U R P A * Over old ow"s, use avoosp blast or high pressure water blast. F R . Over plvanized steel, surface must be free of grease and oil. A A s Men used owr MO -Zinc, use 9-4 trills DFT (My Film Thickness) of Me-Bric. C T a Over old tl" adherent epoxy tar, use power wash or solvent wipe. E I 0 Now: This product and most Wasser uteftries am designed to adhere to poorly omared surboes such as old N ado rd rust, and poorly clemed surfaces; howmer, led patches should be make when good surlace, Is not possible. a Ocnisuld %W PalrdIng Practle-esm A U" *AV MC-ThInfler P APM At 4-7 mile DIFT per coal. Avoid Ogle applications above 10 mils DIFT, P On steel qp over MO-Zlnc If pcuR;W. This glvn cathudic pratsolon I there Is arry mechanical damage, L D . ovre m1nirnurn 4 haute between coats ed minimum 30% relative humidity md 49-9v F. If I humWky Is 10-30% or temperature Is 25-W F. dow more time between coata. Films above 6 mlls DFT C ra Ire longer dry times. A Calnubs Immersed after arm hour. If additional coon are required, Immersion Is perm Ned between conts. Tsver al *&he &W reeklue must be washed away before recoaa ng. 0 N*W W*owWmre*wmtneyboappftdi*4&mpouda*ooeavwyhlohunildM*o. AvoldoWl6dican over N obvious wet ditain or puddi" of water. AvoW dipping s darnp or wot brush or rdler back into dw pWnt n"miledy kar bm PwWs of time wlihout u6m mom mint, Inmtolm water InID the Paint cm cause neft. P This product Is for Industrilial use only. $ I 0 X mmwa: vapor and spray mist are hsWul. Consult the material salety data shoot. Use an F U approved respirator In conflned areas when bruahing or rolling. Use a positive premire air flow T T hood when expood to spray mist or overspray. I"mted skin wW eyes from contaa This Y I 0 product ConWns organic solvents and polylsocyanates. Do not use If you have a chronic or N allergic reacition to lsocyanates or organic solvents. 6 Womw Hagh-roch Cw*V warronts he pmdu= za 00 &W *an OVOM In MOVAN VV WWWW", W%NW NWI-TOM C48WO WIV ablaidtan and buyer,'s mdushin rormody In ceirwactim welth the preduds sh" kas 11mbod, at Wommor High-Tach tdanfirtg% captkan. to elther re - Any W eWmw*rtftftmmtwmustbomadebyBuywtcWuwKgtt.To�CombpinwdingwAtNnkv(S)dwisotOLWadiswvwyoiftdalnod A 40*4 but In no vi*M I&W #w Ow **mzlora of ft aWivolaf* sholl Die. or Wx momOm borra ft dMNvry deft, viblefic vo Is ourfier. Buyeeta R Mum tP no* Wavor Hleii-Tv;h Onlrov of such non-conbrittar= u nKMW her* *Wl bw Buyv ftm remory under this Warmly. R Wm@rHIO-TeMCn*V&mW=noctorwwriesovowningt*pmduca. swuln, A suMse werIondso of I od snalogly offlWaS for a garlWar Ougoes, sholl appti,. In rooMt ohO Wooer Hoh-TWO Oft"o be koft for N m=qwntild or linklm Od dsmeW, T Any nowwriondsilDn or a0sodo roWnq ID ft un cd the piAM modo by Wunt fth-Toah Caatqs, whotter In Its NdmkiW Owswe, Y win response to spodicinWhy, or OwwO.Is baW an dow DeReM Io be 409; P*~, Me poluca am WwWon are IrmWed for use by OWM ImAng MqUWM NU and knOW-IOW In to M"Ify, W4 ftWW It 12 1W FILW M N6* 120 of 1118 OUNNOW or fte Wdu= for Ib own pwd@Ldar uss and It OW be doerned #W Buyer hes dons on, atb sub d1saarodon and PhOL vorlation In on'Aronrnont� charip" In wV Ion w dwrago w1olng vA 9f, CmancloO with, w mmoulling Imm the um of *an PmdLgft. &NO In no aU* *ZW*d OW PLrahme P*N alloaft to ft prodm or Met Ow ~ give fto to da cieft. In no em i " WUM be IW* for owesquernle! or hcWenfal N." on SEP-10�'90 MON 10: 5B HIGH-TECH TEL NO:206-850- 7 4297 P06 W� W . Primmoo MC-Elno most versatile, @say to uoe, ?.In@ doh ooating. MO -OR Prifner/Topooat GpedaKy Primer/coating with ohernical reelstanes for steel and i u a umlnum. PrImemAmormadlaim: Nic-Ferrox 0 Unique MIOX coating with many uses. Boat poesible prImerl Intermediate on previously paInled bridgea and madno ateal. Colore sind metallice. MO-Intermedlate Universal pdmerlintermediate In maMne atmospheres. MO -Luster Intermediate Low gloss, aliphatic, long life exterior coatIng or colored base coat under M"lear. Colors and metallios, affp�R- MO-Shleldcoat Super color coat, aliphatic long Ills exterior coating. High gloss, chemical resistant coating on structures and floors. All colors. MC-Ferrox A Unique MIOX. aliphatic coating. Longest life of any urelhane. 'Many uses, brIdges, chemical, Madne. Colors and metallics. MC,Aroehleld Aromatic version ol Shieldcost. Hlyh @loss, chemical resistant. I .interior OV CIOW Y eXteflOr MO -Tar MIOX,orreq lar Superooatlng to repleoe coal tar epouy. Usewith Papid Immersion on splash zone, pipeline, water -works, marine, and pWr mill. MO-Oloar Most durablo chemical resistant, aliphatic @@atinq. u r high P Toossonwo&I,conciiiefloore. LonglifecleaFm WiLustor termadlate and MO-Ferrox A. IndusWal, madno, autornotlyo. MC-Amdear Same properties as MO -Clear, but for Interior use. 0 SpOISKY caolnpo MC.-ConSeal Sulfide resistant sealer/coating for concrete pipe colora and clear. MO-Ardigraffli Clew All the pmpanlee of MO -Clear, but repels everything, Ice. marking pens. paint. dirt. Very light stable. MC-Alufninum Primer. topcoat In metalile colors and silver. Recoats weathered galvanized steel. Inoapsulates, rust, Universal coatIng. Note: All of the above p"ets can be applied In cold, darop or high humicilty stmospheres and cmn be Immemed after one hour. SEP-10-190 MON 10:57 7SER HIGH-TIECH TEL NO-206-eSO-29G7 4297 POE5 0 SRNGLE COMPONENT MONSTURE CURE URIETHANES Highest Performance - Maximum Coating Life 0 Best: Corrosion resistance - Broadest range of general ohernloal resiganoe - Urethane flexibility, weathering and abrasion rosistance * OutstancOng color and gloss retention Tmuble Free Application Oan be appliud on oold dampaurlaces at temperatures below freezing at humidities to 99% a No dew point restriction -1-1 Simple to Specify - Fewer application delays Year round application season a VOG oompliant z,_Does not require an approved applicator LO'VELL-SAU &LA'ND -ASSOCIAT' - C. 19400 . 33rd Ave!. W. Suite 2090 LYNNWOOD,! WA 98036 Phone (206) 77571591 TO IT'� CF rot ot\,j \-S �_ C I V r JUN 2 8 Is,%- 0%!9M V-M — - i OINLLT FILE > WE ARE SENDING YOU ;��Attached El Under separate cover via— • Shop drawings 0 Prints Plans • Copy of letter El Change order 0 9 LETT* O)F UKU 6 E MRIL DATE JOB NO. ATTENTION RE: following items: 0 Samples 0 Specifications COPIES DATE NO. DESCRIPTION Z�> THESE ARE TRANSMITTED as checked below: • For approval • For your use tK As requested 0 For review and comment El FOR BIDS DUE REMARKS [:1 Approved as submitted [:) Approved as noted El Returned for corrections F� • Resubmit —copies for approval • Submit —copies for distribution • Return —corrected prints 19 0 PRINTS RETURNED AFTER LOAN TO US COPY PRODUCT 240­2 IM, GMW. Mm 01471. SIGNED: If enclosures are not as noted, kindly notify us at once. 2q M E M 0 R A N D U M June 11, 1991 TO: Dick Mumma Building Official FROM: Ron Holland Water/Sewer Supervisor SUBJECT: ACCEPTANCE TO THE NEW LIFT STATION STREET FILE a-rq iV/V?2r- In regards to acceptance of the new Lift Station for sanitary waste for the Third Ave.. Park Apartments. We have inspected this facility and found the following changes are needed in order to finalize this project. These changes are currently being worked on and should be completed in no time. 1. Brackets for floats are to be relocated by pump tech incorporated as per City requests. 2. Locking nuts on electrical panel are missing. When these changes are completed the City will grant full acceptance of the lift station. These changes are to be completed in two weeks. RH/ho cc. Ly.le Chrisman NULIFTST/TXTSEWER CIATES C) A7D HONG W EST& Asso En - eering Hydrogeology . Materials Testing Construction inspection o C v Geotechnical 91 1991 INSPE9TION REPORT E NEE ING DATE: -CT: 61 PROJECT: ACTOR' LOCATION: GENERAL CONTR CONTRACTOR'S REP OUR REPRESENTATIVE:' 0 JOB NUMBER: SUB. CONTRACTOR: 0 PERMIT NO: SUB— REP -- ARCH: 174 llj� /4C ad �r,�r 5 7_77 —Z A 0+� Xzg_ 7, ---------- F1 PAGE� OF-1-- HWA 101-90 otf ice Copy - White Job site Copy - Yellow inspectors Copy - Pink HONG CONSULTING ENGINEERS, I o GeotechnicoJ Engineering o Moterial Testing o Construction QuoLlitq Control C FIELD DENSITY REPORT r -9 est Apparatus, Mach Nov/c ...... on: s: 73 5) Addres 5T < 0-) SToil Descripti ..... .. r 710 0 cc Job Number. Te ratl.173�1'� Ai OC /S 1'. Date Tested: R. By: Specified Compaction: ...... Client: ... ard: /�'S'7-41.. Compaction Stand 7/1... ........ ... ....... . ............. . .... Minimum Dry Density: PCF Maximum Dry Density: � 1�7 70. PCF Attention: Optimum M.C.: 0 7,, .... ........... % .... ..... .... I ............................... .. Test No. /'P Location /j, t I&II.L 6X f , ,, /* Ele va t i on Wet Density PCF 6. C-. .3 ;z 0 .. ........... ..... .. .... M . o . i . sture . Content — % 111.3 /0, Dry Density — PCF A '-� 0 Compaction — % /045,0, /a �6,7 — — Test No. Location 10 7 Elevation Z/ C' Wet Density — PCF ......... ... .............. Wo .137- Moisture Content — % . ....... . . ... ;7 '3 .. .... Dry Density — PCF /,,Z 6, 131, 13b 0 Compaction — % /0 0* y 6 �6 IA5,U /J/,O - All tests performed in occordance with AS7M— 0 0 M E M 0 R A N D U K May 22, 1991 TO: Ed Somers, Associate Planner FROM: Gordie Hyde, Engineering Coordinator SUBJECT: ADB AGENDA COMMENTS ADB-38-91: Applicant to comply with Ordinance 1924 regarding storm drainage. Right-of-way construction permit required for driveway approach. ADB-43-91: No comment. ADB-45-91: No comment. CIO ADB-46-91: No comment. ADB-51-91: No comment. ADB-52-91: No comment. ADB-53-91: No comment. ADBj166-88: Suggested revisions for parking is okay, except two (2) handicap stalls required. ADB-37-90: Final civil engineered site plans to be approved by City Engineer. ADB-123-90: No comment. ADB-31-91: College Place traffic mitigation fee required. Driveway width to be a minimum of twenty-four (24) feet. Incomplete submittal. Engineering will not review. ADB-32-91: Driveway width needs to be fourteen (14) feet curb to curb or show gutter. Access easement to be improved to City standards or remove westerly access. Right-of-way construction permit required for curb cut. ADB-47-91: Applicant to provide proof of public easement from Edmonds Street. Seven (7) foot wide sidewalk required in R.M. zone. Storm detention required. ADB-49-91: Seven (7) foot wide sidewalk required in R.M. zone. ADB-50-91: Storm detention required. Seven (7) foot sidewalk required in R.M. zone. Applicant overlay alley if condition warrants. Existing curb, gutter, and sidewalk to be repaired if condition warrants. GCH/sdt ADBCMNTS.ADB/TXTST530 MWO, Ll CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 Ll COMMUNITY SERVICES: Public Works a Planning c Parks and Recreation a Engineering May 14,1991 Mr. Bjorn Thuesen Thuesen Inc. Realtors 322 Main Street Edmonds, WA 9802C RE: Temporary Occupancy �&. Thuesen; S T R' E Z-1" F I L E RECE:1V E: 1) MA Y L a w, ENGINEERING LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR In response to your request of May 13, 1 have compiled a list of corrections forwarded to me as a result of inspections on your site. I will break the list into two categories; 1. Those items that must be completed before a Temporary Certificate of Occupancy will be issued and , 2. Those items that have been identified to date that must be completed be for a final occupancy will be granted. REQUIREMENTS FOR ISSUANCE OF TEMPORARY OCCUPANCY BUILDING DEPARTMENT: The Building department is willing to approve temporary occupancy at this time. FIRE DEPARTMENT: On 3/12/91 the Fire Department granted permission to occupy Building #B. The records do not indicate any other building has been approved. At this time only building #B may be occupied. PLANNING DEPARTMENT The Planning department is willing to grant temporary occupancy at this time, with conditions. PUBLIC WORKS DEPARTMENT During an inspection this morning (5/14/9 1), Public Works partially tested operation of the lift station on the site. The lift station is apparently operational, but the telemetry has not been installed. Since there is adequate storage capacity for one (1) unit in the event of system failure, temporary occupancy for one (1) unit can be granted at this time. ENGINEERING DEPARTMENT: After inspection this morning (5/14/9 1), the Engineering Department is now willing to grant a temporary occupancy, with conditions. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan % 0 CONDITIONS THAT WILL BE PLACED ON TEMPORARY OCCUPANCY 1. Install lift station telemetry by June 15, 199 1, as required by Engineering and Public Works.. 2. An application must be submitted to ADB by May 2 1 st for changes made in the following areas: a. Landscaping installed does not match the approved landscaping plan. b. Installation of unscreened mechanical equipment contrary to approved plans. c. Changes made to exterior lighting. Approved plans indicate nine (9) exterior light fixtures, but only five (5) were observed on site. d. Brick pavers shown on plans were not installed. 3. A permit is required for the fence adjacent to 3rd street that was not shown on the plans. This fence appears to be in the city right-of-way and will have to be moved or a street use permit will have to'be obtained. 4. Problems have been identified with the approved parking plan and must be resolved before final occupancy can be granted: a. Four parking spaces were under sized and may not be counted if they do not meet Engineering standards. b. The second handicapped stall shown on the approved parking plan has not been provided. c. Two spaces were not properly striped. CONDITIONS FOR FINAL OCCUPANCY The following items are those that, to date, have been identified as corrections required before a FINAL OCCUPANCY will be granted. FIRE DEPARTMENT: All building on site must be inspected by the fire department and approved for occupancy before a final occupancy will be granted. Currently only building #B has been approved for temporary occupancy. PLANNING DEPARTMENT: The planning department has forwarded a list of corrections to be satisfied before a final occupancy will be issued. These corrections include: 1. ADB approval of all landscaping changes that have been made. 2. Approval and compliance with the required fence permit. 3. Insure the required parking has been provided. ENGINEERING DEPARTMENT: The Engineering Department has forwarded a correction list to the Building Official after their site inspection. They asked that no final occupancy be issued until the following items have been completed; 1. All drains and sewer manholes must be cleaned of all dirt and debris. 2. The on site sanity sewer lift station control panel is not accessible. The existing enclosure is too narrow to allow for access to the "Power Disconnect Switch". 3. The lift station alarm system has not been tested. 4. Current configuration of check valves in the lift station does not allow for alternative by- pass. If one by-pass fails the system will fail. 5. Parking stalls at the side and rear of Building A and in front of Building B shall be in compliance with city parking standards. 6. Open plugged drain at the base of stairs to garages Building A. 7. Install locking nuts on all manhole covers. 8. Grout pipes, in valve vault, that run to lift station. 9. Grout all catch basins and manhole extension rings including grate at rockery near stream. 10. Clean out oil separator and all catch basins. 11. Connect downspout on south side of building B and southwest comer of building C to storm water tightline. 12. Secure chain link fencing to fence posts. 13. Provide a locking latch on lift station gate and widen east side of enclosure an additional 30 inches from its original position. 14. Provide required as built drawing of existing utility development. 15. Install lift station telemetry by June 15, 199 1. (will be noted as a condition of the Temporary Occupancy). 16. Repair asphalt paving on south side of building A. PUBLIC WORKS DEPARTMENT: The Public Works Department has forwarded a correction list to the Building Official after their site inspection. They asked that no final occupancy be issued until the following items have been completed; 1. Telemetry for the lift station must be installed, tested and fully operational. 2. The generator hook-up must be compatible with the city generator and the motors must be in the right polarity. I hope I have provided you with the information you need to make progress on your project. Please contact me if you have any questions. Sincerely, F-1 Z.A.- R. Dick Mumma Certified Building Official cc: Mayor Naughton Peter Hahn, Community Services Director Robert Chave, Planning Manager City Clerk for distribution to City Council Members December 18, 1990 Mr. Gordy Hyde, Engineering Department City of Edmonds 250 - 5th Avenue North Edmonds, WA. 98020 Dear Gordy: We would appreciate if you would consider lowering the City Park.road adjoining our condominium development at 430 - 3rd Avenue South in Edmonds, the purpose bel ng to facilitate the access of the Fire Department to our project. Also, would you please have the city trim the park maple trees where they overhang our project. We had a bid from our tree man of $300.00 with the City removing the debris. His name is Steve Gillis, at.-#742-2926. S inc ere ly, BT: pn (P BibRN 'TLF-'U1F=6EH1NC. 322 MAIN STREET - EDMONDS. WASHINGTON 98020 775-1953 June 22, 1988 Q TP, T F I L E Ms. Lee Francis, Associate City Planner City of Edmonds 250 - 5th Avenue North Edmonds, WA 98020 RE: Architectural Design Board review of City Park Apartment Complex; 430-3rd Avenue South. Dear Ms. Francis: In answer to your memo to us I would like you to include the following conditions with our application previously submitted. lie are attaching a copy of your memo for your reference. 1. D.O.E. approval of sewage pump station will be applied for and received prior to our submitti�ng building plans for the project. This per our consulting engineer, Lovell-Sauerland & Associates. 2. Temporary erosion plan will be submitted with application for building permit. 3. The wetlands boundary was determined by the environmental consulting firm of Shapiro & Associates. The report was submitted to Mary Lou Block and she responded by letter to us, the recommendation contained in which we are follow- ing to the letter. 4. Hydraulics permit should not have been obtained. We do not intend to trespass past west of the wetland boundary and intend no construction of sidewalks, etc. on wetlands property. 5. Emergency access is optional by the City. 6. We are going to eliminate the gate in our final plans. ..continued Ms. Lee Francis City of Edmonds Page Two 7. Our architect incorrectly used another city's requirements for back -out width. Our final plans will show the required 42 feet by simply moving our rockery and parking area the required distance north, along our north property line and by moving the sidewalk westward along the east side of Building B. 8. A slope profile will be submitted for Ci'ty approval with application for building permit, however, by spending a few minutes on the preliminary site grading plan submitted to you, you will see a gently sloping parking lot where, for example, the 120 ft. on the north side of Building B will slope from 31 ft. down to 28 f-t, a mere 2-2%. You can determine that easily by comparing the basement floor eleva- tion to the numbers in front of the garages and by the top inverts of the catch basins. 9. There will be no earth removed to other locations and/or brought into the site. The grading plan balances the quantities. 10. Building A has 4 double garages and 1 single total of 9. Building B has 3 double garages and 9 singles total of 15. Building C has 8 single garages - total of 8. In addition to the above, we have open parking spaces of 26. ... for a grand total of 58 11. Two handicap parking spaces will be located in the two northerly stalls by the cluster of four open spaces near the building entrance. Two more handicap parking spaces will be located in the westerly two spaces of the 5-space cluster in the northwest parking area. We have requested from our environmental consulting engineer a re- landscaping proposal pertaining to wetland species, said species to be planted in the 20 ft. buffer area where needed and will be included in our future landscape plan. Sincer sen, President :F;r4Phuesen, Inc. BT:pn enclosure cc : Mary Lou Block , Manager of Planning -":v 4b 0 t t JIL 46 e?(C t 4 0 Z 0 VA 0 W. CIT'F,.0F EDMONDS COM MUNITY SERVICES DE . OARTMENT sfkUCTION'PERMIT.* RIGHT OF'WAY CON A. * Owner- -Snohomish County PUD No. 1 Name . . P.O.' Box 1107 B.- * Contractor: Name Mailing_Address Mailing Address Everett, WA 98206 City State Zip City State Zip Lorren Patchett 347-4353 Project Eng AW1YU0PMQY1WUbU L Telephone Number C. Address or Vicinity of Construction: 430 3rd Ave S 6VV �10 Type of Work to be Done: Q12en cut 3rd Ave S to construct a ipliase distribution tine to serve City Park Apts D. 0 Work in Connection With: 0 Sub or Plat 0 Single Family 0 City Projects 0 C ornmercial 0 Mulk�amily 'alljs tLlity E. 0 Pavement Cut: FEI Y El N F. 0 Size of Cut: 2t X '50' APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and.by his signature to-this-applifi, * es to hold the City of Edmonds 114 q. rtagre harmless from any injuries, damages, or'claim's of any kin p�,Hp7ug. oggr., f forseen, that may.' L0r;C1n_orc In be made against the City of Edmonds, or any of its departzherits oi e pl ding ornot lZired to the defense of any legal proceedings including defense costs, court costs,�/and attorney fe s by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE.FOR WORIZL)ANSHIP AN6 MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration -fees will be held until the final street patch is co I t 'd by City forces, at which time a debit or credit will be processed for issuance to the applicant. T, 71 * A 24 hour notice is required for inspection; Please call Engineering: 77-1-3202 * Work is to be. inspected during progress'and at completion. 0 Restoration to be in accordance. with City Code. P T 0 Street to be kept clean at all times. STRE" 9 FILE. 0 Traffic Control- to be in accordance with City regulations. * All street-cift ditches must be.patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. SignaiLLi��Xv Date: 9-13-90 Owner or Cont. cior This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: Tirrie Authorized: Void after 60 —days. Special Conditions: NO OPE-i-4 C-u7i RoAD f3ciffi-z_ Ot4 NORMAL- RaWE4,T, CITY ";HALL ALLOW RQAI) CUT 16N TH15 PEKmrr 7 oubrH P .,Asa.o atJ cowDi-riori% oN OTHM RELEASED BY: Date — nr4 'kito AVE A N 0 0 V4_14 L A I OF 0� #_ CO. PERMIT FEE: 0�42 — Restoration Fee: Receipt No.: Fund I I I Fee: Street Cut Dimensions: x INSPECTED BY Ad WOR . KJO BEGIN PRIOR TO PERMIT ISSUANCE 41 Eng. Div. March 1989 FIELD INSPECTION I I - Route copy to Street nrept.) i, Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Mork Disapproved By: Date: FINAL APPROVAL BY: Date: F.ng- Div- JuIv 1985 0 CITY OF EDMONDS �'-F' '250 1,TI-i AvE tj - EE,kiorjos WA 98020 - (2(?G) 771 1.10- COMMUNITY SERVICES: Public Works o Planning * Parks and Recreation a Engineering , 8 9 0 - 19 L) - September 16, 1991 FILE STREE' Bjorn Thuesen Bjorn Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 RE: Quit Claim Deed for Fence at City Park Apartments 428-432 3rd Avenue South Dear Bjorn: LARRi S NAI.)(:,HTFt] KAA � C)9 A . PETER E. HAHN DIRECTOR We received the subject quit claim deed but unfortunately the land you are deeding to the City already belongs to the City. What we need is the fence deeded to the City with a clause stating that repair, maintenance, and liability of the fence will be the responsibility of the owner/owners of City Park Apartments. If this is not satisfactory to you, then the fence will have to be moved to your property line. If you have any questions, please call me. Sincerely, Lyle Chrisman Engineering Inspector LC/dm Enclosure Quit Claim Deed cc: Dick Mumma, Building Official Street File Thuesen B:\Word Alberts o Incorporoted August 11, 1890 a Sister Cities International — Hekinan, Japan UIT CLAIM DEED THE GRANTOR, BJORN THUESEN, INC. , for and in k-c—Is-!deration of mutual benefits to be derived, convey arid quit claim tc the City of Edmonds, a municipal corporation, the following described real estate, situated in the County of Snohomish, State of Washington, including any interest therein which grantor may hereafter acquire: The westerly 2 feet of that portion of 3rd Avenue South in Edmonds laying easterly of the south 48 feet of the easterly 400 feet of the north half of the northwest quarter of the northeast quarter of the northeast quarter of Section 26, Township 27 North, Range 3 East W.M.; EXCEPT the north 190 feet; and, EXCEPT roads. Logether with Ae right to make all -necessary cut or fill slopes on the land of grantor's adjacent to the above -described real property in connection with the construction, maintenance or improvement of the above -described real property for purposes of a public roadway. DATED this day of ... Y,Oc' 14�c) ACIII-.-NOWLEDGIMENT IN -k CAP-AC-44'. AOTAR 0 Ll Snohomi-sh------ I Al I. V/ A S 1jorn-Thu sen S:__ t\ e— the indiv;dual(s) %vhc that, tc. a7.f4 2rk-,,,-x!e­_ged iz as the ident Bjorn Thuesen. Inc. :-e free anc ac o� S--_­_:n D--rtv for -he us-ts and ::)u.-Iyoses -,i-e instn=cnt. zz Y FIU�l LIC FOO E ,0 S --c F !4 Mv appointrn= eNP;reS BibRN THUESENINC., REALTORS 322 MAIN STREET - EDMONDS. WASHINGTON 98020 775-1953 STREET FILE September 11, 1991 Mr. Lyle Chrisman Engineering Department 0 C ity of Edmonds 250 - 5th Ave. No. Edmonds, WA 98020 Dear Mr. Chrisman: Enclosed please find Quit Claim Deed to the fence on City property at approximately 428 - 3rd Avenue South. We are correcting the parking situation so that we should be able to obtain approval by next week. S i n c e r e 1 y , BJORN THUESEN, INC. Bjorn Thuesen, President B T / j s cc: Richard Mumma/ BUILDING SEP 12 1991 M CITY OF EDMONDS 250 5TH AVE N - EDMOUDS, WA - (-'(16) � 71 COMMUNITY SERVICES: Public Works a Planning o Parks and Recreation e Engineering ' 8 9 0 - 194 I September 16, 1991 0% ftft� - qylR��7s. ) 'k Bjorn Thuesen Bjorn Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 LARRY S. NAUGHTFN '4A,OR BUILDING SEP 181991 RE: Quit Claim Deed for Fence at City Park Apartments 428-432 3rd Avenue South Dear Bjorn: PETER E. HAHN DIRECTOR We received the subject quit claim deed but unfortunately the land you are deeding to the City already belongs to the City. What we need is the fence deeded to the City with a clause stating that repair, maintenance, and liability of the fence will be the responsibility of the owner/owners of City Park Apartments. If this is not satisfactory to you, then the fence will have to be moved to your property line. If you have any questions, please call me. Sincerely, & /e f 001, 4 L le Chrisman Engineering Inspector LC/dm Enclosure Quit Claim Deed cc: Dick Mumma, Building official Street File Thuesen B:\Word o Incorporated ALI_qUSt 11. 1890 a Sister Cities International — Hekinan, Japan 6 QUIT CLAIM DEED THE GRANTOR, BJORN THUESEN, INC. , for and in k-c-tisideratior, of mutual benefits to be derived, convey and quit claim to t�ie City of Edmonds, a municipal corporation, the following described real estate, situated in the County of Snohomish, State of Washington, including any interest therein which grantor may hereafter acquire: The westerly 2 feet of that portion of 3rd Avenue South in Edmonds laying easterly of the south 48 feet of the easterly 400 feet of the north half of the northwest quarter of the northeast quarter of the northeast quarter of Section 26, Township 27 North, Range 3 East W.M.; EXCEPT the north 190 feet; and, EXCEPT roads. LOgether with the right to make all -necessary cut or fill slopes on the land of grantor's adjacent to the above -described real property in connection with the construction, maintenance or improvement of the above -described real property for purposes of a public roadway. DATED this day of 10, zeij-, Mx/ 111-XIA40-�Cl A�<� V ACKNOW'LEDGIMENT IN �k REPRESENV�A 7 E C_ P A T oo I-)F ',VAz_:,i41NGTr)N P UBM J� ;F %111 37 9'?""FA� Snohomish el ;.�N �� S!are ax indiv�dua�(s) -xho Z-;s to CxCCL., 1h -wic "ged it a 2. -�rc_v, :-'n �azh -,tzed t-hat r�:�=.Crt ar:� ?&no s the Presid nt Thuesen, Inc. ­,e free aric ac o; , -ior �he uses and pur oses meniionQ� i.-i zhe instru—niept. NM 1.3Y PUBUC FOR THE S E - !1C F Mv a- -3/ ZIF �_ . - ppointmenz exp; e- 7A R6g )SW ----RSCEiVED SEP 13 1991 x�7 ENGINEERING 77- LLJ LLJ I V-XV7 CC 7 7, �/ 7- 15. V� .56175,�6--rlll : 6 t 1z" &.7- wk , 1-%" - u I d-24 we ST A _��RES 12ios 14 72 I-M AV cs 711� A /,I— �-57 7 ............... 9A 36 Is E We IRES 12!06 NOTICE M AND/Olt OWNER PARTIAL APPROVAL El VIOLATION CORRECTIONS REQUIRED PERMIT NUMBER NO PERMIT — STOP WORK — REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMPLY WITH BUILDING LAWS. CONSTRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND PERMIT — STOP WORK- MAKE EXISTING WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE IT. STOP WORK — UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR. VrA CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED. WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED. CONTACT INSPECTOR AND RECALL FOR INSPECTION. ARRANGE FOR APPOINTMENT. ,Zl.,O-f _Y707710A.).' /Rwzi 411e:4- ezaar A4X,6_,!� — / - OXW,44A g 1140o 4eW Ap A I;- 4A/ AA� *95 THE ACTIONS OR CORRECTIONS INDICATED �BOVE ARE REQUIRED WITHIN DAYS OR PENALTIES IMPOSED BY LAW MAY BE APPLIED. FOR INSPECTIONS CALL: 771-3202. 0 BUILDING DIV. PUBLIC WORKS INSPECTOR _'71 El FIRE DqT. CITY OF DATE IK SwA$ee4 EDMONDS MI.M.W.UA 1.0, 2 . gi MAT BJORN T�HUESENINC., REALTORS 322 MAIN STREET - EDMONDS. WASHINGTON 98020 . 775-1953 STREE.ET F11,.-E May 13, 1991 Abel Curbing, Inc. P.O. Box 1862 Everett, WA 98206 Gentlemen: F'P "� q At our City Park Condominium project, 430 - 3rd Ave. So., Edmonds, number 4 parking stall near the gazebo measures only 8 feet in width. Some of the stalls measure 9 feet. Please make the appropriate change to meet city standards. Also, parking stall #9 has the number reversed so it looks like a number 6. Please let us know when this has been corrected. B T / j s S i n c e r e 1 y , N C . BjbRN 0 INC., REALTORS 322 MAIN STREET - EDMONDS, WASHINGTON 98020 775-1953 S 'E'T FILE May 13, 1991 City of Edmonds Engineering Department 250 - 5th Avenue North Edmonds, WA 98020 Re: City Park Condominiums 430 - 434 3rd Avenue So. Edmonds, WA Gentlemen: C/ P bol Receiver) 14A Y A o ,99, FNGjN!k%G We have been asking for a Temporary Occupancy Permit and would appreciate it if you would submit"to us your check list of things that have been approved and things that still have to be attended t o . Please call the undersigned so that we may pick up your check list at the counter as soon as possible. S i n c e r e I y , B J 0 RX-/-�HU E S F INC /,Thuesen, dent BT/js --T -- S--W- t -,FILE, Alsl w7x- 77AgZ.,-, A &-0 6 -61)OfA�);F 7 AU 4 7-Y aA) lAo( 07 eV,,gzj 4eoo D holl /0 leo( /vk 41 */440/ RoO W4 �9 4 r4XIJ Alf A 0ow 1722 A�Mrw-l' -all ve?l OF 'A In $A 12 1- 1- coo Inca A A A 04 C4 C14 e I offilo 0 571-) /06,/ �kj )r7eewr A292- )542��,-O 61-04, A /A),,'--W-� -57247,Z.5 (7-,-, l<lq7zQ-c7, 6,:o IWAIAI ^Uaq6�3 T71 f 71/ 4fA1j5w-s Av /-./. -S X /--71 /4 6dequr A-f2ellluo Iz- 7- 7Z� -57-2)5 0 ;741)71--1AP—, Lb�A)5ROZI 7- 4V. �54W4 AZ-, 5 kO MV 77,1,1477Z�l 14 �A-)AAFiPs 7 Tv, 15'k 7- ZZ. rLl 6`01 Z,' 7-7, )5��/ir L5 4V41L 5v 04/2"1 09 EDMCNDS RJELIC WOWS 002 29 STREET FILE TO: Dick Mtum FROM: Ron Holland SUMEM CITY PARK APARTMWrS iR — " A A P R pr ERMIT COUNTER 1. Telemetry from Stead & Baggerly must be hooked up per City of Edmonds requirements' Must be hooked to 110 control breaker so if turned ofi, alirim will sound at shops. 2. Generator must be hooked up correctly to accept City portable generator and motors are to be in right polarity. 3. Valve vault must be hooked up with proper drain to wet well and provided with a check valve that is accessible so maintenance can be performed in wet well. 4. Fence is to be constructed around electrical panels (61 in height with full gate opening on south side to allow access for maintenance). Must have 3' working space on sides and back from furthest extremity of electrit;al boxes. 5. Manhole lid on valve vault must be reset and mudded so as to allow no leakage around base and must be aligned with opening. PREVIOUS REPORT No. 0 CASCADE GEOTECHNICAL, INC. 12911 N.E. 126TH PLACE (206) 821-5080 KIRKLAND, W �INGTCN,980�4 `Ao,&,P�06).�23-2203 TO: zz ATTN:-.. THE FOLLOWING WAS NOTED: A ovir- DATE .1 JOB NO. PROJE_�!T__ LOCATION Z/�o BLDG. PERMIT NO. OWNER WEATHER TEMP AT Am C E 1 v m:-o PM ENGINEER APR 3 0 1201 ARCHITECT CONTRACTOR EENGINEERING I X "All -1.6 137-,3 1co coo oli COPIES T FIELD REVIEWED By PY 6Z��t) rA) i', I SA STREET FILE January 17, 1991 MEMO TO: Dick Mumma Building Official FROM: Gary L. McComas Fire Marshal SUBJECT: SECONDARY ACCESS FOR 29 UNIT APARTMENT AT SOUTH The requirement, to provide a secondary access from Edmonds City Park is removed. As final grade was established in the complex it. was obvious that the grade transition would be very difficult and several solutions were investigated. It is now apparent. that there is no practical solution. ::2- GLM: be PROJECT etTlj. .............. PROJ. CONTRACTOR ....................................... DATE ............ 1! ................ WORKERS ON SITE ................................................. ............................ f-. -r FTP-F'm 'FILE ........................................ a t I EQUIPMENTON SITE ....................................................................... ................................................................ PLf WEATHER ..... 0— ......... o .......... TEMPERATURE .4�:5 ................................... 12f DAILY ACTIVITY (A.M./P.M.)�.1159 .... !'Do ................................................ �t,,OLX2 P40J- ................... .............. ....... ........................... y............ ................... ............................ . ............. ................................................ o ........................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..... .......................................... ........................................................................................ ................. ......................................................................... ................ ................................................................ .......... FOLLOW-UP TEST-ING ...................................................................... .................. ............ CITY REPRESENTATIVE ... DATE/TIME. ......... ............ ........... PROJLO'G/TXTFORMS 0 0 V .PROJECT .......... PROJ. # ..................................... CONTRACTOR ............................ ; .............. DATE. 1.q ................ WORKERS ON SITE.� .......................................................................... EQUIPMENT ON SITE ............................................ ............................. ................ .............................................................. WEATHER .................. TEMPERATURE A4. n6z, ........................... .DAILY ACTIVITY (!A.M./P.M.) .............................. oo ....... ........................ .... oo OA. A ............... ...................... _�Ov--17- &AW1_ 17' Aopxl,. ........................ 0... o ...... o..�.. 0 ***'43WOef &�R?f-y AluP .............. ...................... oo..o ........ ?�:; .................. o .................................. ..................... oo ........... o ............. o ...................................... ........................................................................................ o ................... o ................. 0 ................ o .......................... 0 .............................................. ol ......... 0 .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS). ................................................. . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................................ FOLLOW-UP TESTING ......................................................................... ........... ....... .................................. ........ CITY REPRESENTAflIVE A ........................... DATE/TIME. PROJLO I G/TXTFORMS 0 0 P R 0 1 E C T .............. PROJ. # ....................................... CONTRACTOR ............. ............... ............. DATE..)��.�� .7p ................. WORKERSON SITE ................... I ...... ; ................................................. EPUIPMENT ON SITE .......................................................... I ............. .......................................................................................... WEATHER A�(-V� ................. TEMPERATURE .............................. ,DAILY ACTIVITY (A.M./P.M.) ...................................................... AK. . . . . . . . . . . . . . ................................................... X/ .............. o o o ... . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AS20 — /1-:0 2��A4dZ; 40D ..o ...... 0 ..................................... 7. .................... o o ....... o .......... o ................................................... o o ........................ o.o ............................................................. .......... ................................................................................. . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROgLEMS) .............. ................................. ............................................................................. T . . . . . . . . . . . .. . . ... . I ... ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . .. .. . . . . . FOLLOW-UP TESTING ...................... ................. ............................... .......... . ............ ............................................. DATE/TI ... ...................... ME. CITY REPRESENTATIVE PROJL 0 0 PROJECT AetS .............. PROJ. # ..................................... CONTRACTOR 7,.AJJ�7?—� ........................ o ....... DATE. ................... WORKERS ON SITE ................................. o ............. o .......................... EQUIPMENT ON SITE ........................................................................ ................ .......................................................... WEATHER CLQJ9�( .................... TEMPERATURE .9P ...................................... 1&0- 1410 DAILY ACTIVITY (A.M./P.M.) ........................................................ PIPE, . ............... t ............. * .. ............................. .......... .............. ................................. ................. ........ .................... ............ ............. .............................. ........................ ...................... ........ ....... .......... ....... ............................................................ ............................... ................................................... .............................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .......... . 15, .................................................... ... .. .... . ... .................................... COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ ................ ........................................................................ FOLLOW-UP TESTING .... ................................................................... .............. ... . .................................................... C TY REP .................. DATE/TIME./�­�O?�. I RESENTATIVE .............. PROJLOG/TXTFORMS1' 0. 0 P R 0 J E C T t4 ............... PROJ. # ..................................... CONTRACTOR .......................... .................. DATE.14. .................. W-ORKERS ON SITE .......................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . �; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . EQUIPMENTON SITE ....................................................................... ................ ......................................................................... W EATH E R 4qq ............ TEMPERATURE 4.5-!�v .................................. ................................... PAILY ACTIVITY (A.M./P.M.) ............... N J4 . . o . . . . . . . . . . . . o . . .. . . . . . . . . . . . . . . . .. . . . o . . . . . . . . . . . . . . . . YME e-e7O ........... ..................... ........ a.*. xqmv�. JA�.qq*Lrpl2 .......... o ............... 1510 - I obzl� I e3b' or- "AD 9 DeA�l ......................................................................... tL.& -�> 6e,'^9616L =.Poe ................ o ..................................................... o ... 0 .......... o .................................................. o ........... o ........................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ! . . . . . . . . . . . . .. . . . . . .. . . ... . . . . . . . . . . . . o . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . ................ .......................................................................... COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................... .............. .................................................... FOLLOW—UP TESTING ................................................................ I ....... ....................... ...... ...................................................... CITY"REPRESENTATIVE ........... DATE/TIME. ................... .PROJLOG/TXTFORMS PROJECT........ ........... .............. PROJ. # ..................................... . . ........ .................. CONTRACTOR LJ ............................. DATER! WORKERS ON SITE ......................................................................... EQUIPMENT ON SITE ......... .............................................................. ................. ........................................................................ WEATHER .................... TEMPERATURE .................................. DAILY ACTIVITY (,AX/P.M.) .4.10 ....................................................... .................................. . . . . . , . . . . . . . . . . . o . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......................................................................................... COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................. FOLLOW-UP TESTING ........................................................................ .................. .................................. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 'CITY RE , PRESENTATIVE ............. . DATE/TIME. ........... PROJLOG/TXTFORMS� P R 0 J E C T t Vq . fMZK kFr.S ................. PROJ. # ...................................... CONTRACTOR........................................... DATE.] .................... WORKERS ON SITE.� ........................................ ................................ ........................................................................................ EQUIPMENT -ON SITE .......................................................................... ........................................................................................ L WEATHER ................... TEMPERATURE ................................. DAILY ACTIVITY (A.M./P.M.) sow. top,:-m -1441� ................................. ..... ... . A ..... . ................................................... I A, ........... !!�tl2f . ......... WA R ............................................................... ......................................................................................... ........................................................................................ .......................................................................... ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..................... ............................. FOLLOW-UP TESTING ................................. ....................................... ........................ . ....... ......................... ........... DATE/ T I ME../. CITY REPRESENTATIVE PROJLOG/TXTFORMS 0 0 PROJECT .................. PROJ. # ...................................... CONTRACTOR ................... I ....................... DATE.9 .................. WORKERS ON SITE .......................................................................... EPUIPMENT ON SIT.E...*o .............................................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WEATHER .................. TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) ........................... ......................... .......... . ........ ........... ...................... P6 JL4 P 5T 941�0 � p, . ........................................................................................ ........................................................................................ ............. ................. 7elloof er- '2� . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A o . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..................................... .............. ................ I ....................................................................... .................................................. o ................ o ..................... ...................................................... I ...................... o ............... FOLLOW—UP TESTING ................... ............................. o .................... . . . . . . . . . . . . . . . . I I I I o o I o I I I I o 6 o I I I I 1 1-1 o . o DATE/TIM. .............. CITY REPRESENTATIVE .'..( ............................ o.o. E PROJLOG/TXTFORMSi 0 0 ..................... PROJ. # .............................. PROJECT .................................... CONTRACTOR DATE . ........................... WORKERS ON SITE ......................................................................... EQUIPMENT ON SITE ........................................................................ ......................................................................................... WEATHER .................. TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) MA5 ................................................ D&?..................... .......................................................... . . . . . t . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ I .......... I ........................................................................ FOLLOW-UP TESTING .............................................................. .......................................................................................... CITY REPRESENTATIVE ................................... �DATE/TIME ................. PROJLOG/TXTFORM�-- 0 0 PROJECT PROJ. # ...................................... ........................... CONTRACTOR ................................ DATE. .1. oc-' c.0 .............. WORKERS ON SITE ................. d ........................................................ I EQUIPMENT ON SITE ....................................................................... ......................................................................................... WEATHER ........................... TEMPERATURE ........................................ ,DAILY ACTIVITY (A.M./P.M.) ............................................................. WNS ............................ tj TD 6 6_ u_F_D (�)",aA-- . . ......................................................................... OuLl- witu- '&_f:::F�t-c-7_ 4t­�u Ic ................................................. ID 5-ovr— AU L;T - �'4 4A-C& .......................................... A .................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . o o o o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . 0 . . . . . . . . . . ..................... ol .......... EZ' ................ ....... . .......... .... . o ... o ........ ................ .................... ..... o..'o COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ ......................................................................................... FOLLOW-UP TESTING ......................... o..o ....... 0 ...................................... ............ ......... ....... ..... ............... ................. ......... CITY REPRESENTATIVE ..../1-2 ........ DATE/TIME ....... ............... PROJLOG/TXTFORMS 0 0 PROJECT . `�l T— .............. PROJ. # ..................................... CONTRACTOR .............................. DATE . . C ............... WORKERS ON SITE .......................................................................... ........................................................................................ E,QUIPMENT ON SITE ....................................................................... WEATHER ............................ TEMPERATURE ........................................ 'DAILY ACTIVITY (A.M./P.M.) p4j, " —5� o 0 " t+ W &—rAUF--jJ , ......................................................... ........... ........... ... ............... ... ...... . .................................................................... -5P-QY2 ........................................................................................ . .... Ti .......................... .................................... ....... I ........ o ... o ..... oo ... o ... o ..... o...o..,...00 .................... o ......... o o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ ........... .............................................................................. ............. 0 .............................. o ................................ FOLLOW-UP TESTING., ................. ....................................................... ................. ......... ............. o .................. I d zg��o POD CITY REPRESENTAT,IVE ................... DATE/TIME ....... V ................ . PROJLOG/TXTFORM& PROJECT ........... ................ PROJ. # ............................ CONTRACTOR ................................. DATE.��. ................... 11, WORKERS�ON S"ITE ................................................................... EQUIPMENT ON SITE ........................................................................ ................ ........................................................................ WEATHER .................. TEMPERATURE ........................................ DAILY ACTIVITY (�A.M./P.M.) ............................................... or-- Pluz--0100��q pwis ....................... ....................................... ................ ........... ... ....... o .................................... .L]om'F---p .............. ........................ ......... ........... ...................................................... . . . . . ... . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................................................................................ ................. ........................................................... ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ............................................ I .... FOLLOW-UP TESTING ......................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DATE/TIME ......... o ............. CITY REPRESENTATIVE ................. ................. PROJLOG/TXTFORMS I PROJECT R ............... PROJ. # ..................................... CONTRACTOR ............ DATE..�� ................. WORKERS ON SITE.'..... ............................................... .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . o o o . . . . . . . . . . . . . . . . . . . . . . . . . . . . EQUIPMENTON SITE .... o .................................... 0 ......... .................... .................................................................... * ..................... Ll 4 ki WEATHER ................... TEMPERATURE ..................... o ... o ................ DAILY ACTIVITY (A.M./P.M.) ........................... o ........................... '51F,-m tpq -0 Q D Pa'W S-f-'2rAQ+) ............ Fj P�gr. ................................................ P%�� bLg- OOT av" A-T U-) �-gwK 4 Tuo ............................. ................................. f -C E� 0 a C, W-r TD 7-40 WA� .06 W-r.. 0AT6,kt4,— ........................................... ........... o .......... p . . . . . . ... . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . ! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............. ...................................................... o ....... w ............... ........... pw ...... ........................................ ................................................ 4aw. LA-Yfig Slb-r �� tkAT-ea- Sc�A<91? ......................... ...... ....................................... ....................... 7b. klA-FL.--,y . ............................... o ............. ..................................................................... COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................. ................................................................. o ...................... ........................................................................................ FOLLOW-UP TESTING .............................. ......................................... o ........... ....... o ...................... o ....... CITY REPRESENTATIVE ................................ DATE/TIME ................... o PROJLOG/TXTFO,RMS'� t5lD PROJECT hff.C,5 ............. PROJ,. # ............................. ......... zo srsta CID CONTRACTOR .......................................... DATE .............................. WORKERSON SITL .......................................................................... EQUIPMENT ON SHE .................. ..................................................... WEATHER ........................... TEMPERATURE ........................................ DAILY,ACTIVITY (A.M./P.M ...................................................... ................................. ............................... W A T -L-- p- -5 r, wm, F_ ty r,4q r,9 '3 LL ioT� (2� -5,-Te— J�t. 14�q.H.T. Z-0"tDP_P—> .......... .............. o ............... ................ 'ts2i) o�-ot,o.7-oL,to 44VW Dlicr �X65_t 6-E PLEU-t- ... Wq.e .................... .......................... P: 2 b 01 �-- a AT. r-4w. .. rj:) I k__T_ r_�9_0 P.-t cle C:TTt Kycb ciz ............. .... o.0 .............. .................. Zo ................. o..O..o ....... o ........ ..00 ...... ............................. o..00..o ..................... oo.0 .......... 000.0 ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ? .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS,'FIELD PROBLEMS) ................................................ FOLLOW—UP TESTING ........................................................................ ............... ... .................................. ...... / 'S�9 CITY REPRESENTATIVE ................................ DATE/TIME ........................ PROJLOG/TXTFORMS X 0 Q/— /0- �/ op CITY OF EDMONDS 250 5th AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES OTREET FILE March 25, 1986 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR Mr. Jerald C. Hall 4437 Lake Washington Blvd., #102 Kirkland, WA 98033 Dear Mr. Hall: SUBJECT: 430-3RD AVE. S. - ACCT. #102-11100 1 received your letter dated March 18, 1986 requesting 'the balance of your water bill be waived. I must inform you that I cannot allow this at this time. The water must be paid for if it goes through the meter unless there are unusual circumstances, such as the City or a contractor hired by the City breaking your pipes. If you have any further questions, please feel free to give me a call at 771-3202, extension 296. Sincerely, BOBBY R. MILLS Superintendent of Public Works BRM/ml cc: Utility Billing BRENA DT MARCH DT PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING 11 E 4437 Lake Washington Blvd., #102 Kirkland, WA 98033 March 18, 1986 Edmonds Water Dept. Edmonds, WA 98020 Gentlemen: Enclosed is my check in the amount of $100 to apply to account 102-11100. 1 am the owner of the house, but it is rented. Apparently around Christmas time a fittle- used downstairs toilet was left running. The problem was not detected and corrected until you notified the tenants in February of an apparent leak, which you assumed to exist because of the unusually high meter reading. I ask that you waive the balance of the bill due to the unusual- circumstances. I would point out also that the toilet which had been left running empties into a septic tank, not into the sewer.. so no additional bur- den was placed on sewage tneatment facilities. Thank you for your consideration. Very truly yours, J I dZC�. �H a 1�1 jch/nah REcEI)4EQ 0 1986 PUBLIC WOOS CITY OF EDMONDS-UTILITY BILLING ACCOUNT NUMBER 0 100-09350 102- 1 loo SERVICE ADDRESS � 430 3Rf) AV S MA G .NAD A I D LR L M E I E NS S G r S TELEPHONE METERSIZEO 3/4 NO. OF UNITS 0 SEWERCHARGEO 14.91 WATER BASE 0 CONNECTED YES SUPPLIER 0 S CODING A W U RAE DTOS 14 METER NO. 1' 2994 LOCATION r DATE READ CONS. NOTE DATE READJ CONIS. NOTE eo eo W-3: 1% 6 Zly 1/3 0 j� ly 12 8 35-8- I -CIT Y OF EDMONDS Permit No. COMMUNITY.. SERVICES DEPARTMENT "'T"-E-E-T FILEIssueDate RIGHT-OF-WAY CONSTRUCTION PERMIT A. Owner: 2C -d- -S, A P/ A/ B. 0 Contractor: N!pS /Name , 2_ /S, , �\ , �( 7 M�aling Addres ailing ,#dd S, a 1-r r-T L-k-) w q,<0 L4 City StAt� Zip tity State zi'P' 6 CA 4f C State License Number Telephone� Number C. 9 Address or Vicinity of Construction: 44 V Type of Work *to be Done: 12 �-x D. 0 Work in Con I nection With: El Sub or Plat 0 Single Family E1,City Projects.,'. El Commercial Xr Multifamily 0 Utility E. 0 Pavement Cut: Y El N F. 0 Size of Cut: X APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense - of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration . fees will be held until the final street patch is completed by City forces, at which time a debit, or credit will be processed for.issdance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. • Restoration to be in accordance with City Code. • St ' reet to be kept clean at all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Date: Signature: Ov�ner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: J. PERMIT FEE: Z Time Authorized: Void after -days. Restoration Fee: 0 Special Conditions: &4etry ed Receipt No.: Fund 111 Fee: Street Cut Dimensions: 2— s /X/7 U RELEASED BY: Date INSPECTED BY Date 0 NO WORK TO BEGIN PRIOR TO PERMIT.'ISSUANCE I. Eng. Div. March 1989 FIELD INSPECTION No (Fuqn?l I I - Route copy to Street Dept.)' Comments: 9-17 - 9 (D LAP TtD f VZ*6*?— Diagram: CONTRACTOR CALLED FOR INSPECTION E) YES Partial Work Inspection by P. W.:. Work Disapproved By: Date: FINAL APPROVAL BY: Date: 0 NO Eng. Div. July 1985 CITY OF EDMONDS N �EW ADD ITION RET, IREMENT ASSET INFORMATION SHEET ASSET NO. ADDITION TO ASSET NO. oo (00 3(3 lo DESCRIPTION ck. SERIAL NO. LOCATION DEPT. NO. PURCHASE ORDER NO. PURCHASE ORDER DATE COST PROJECT NUMBER s o PROJECT COMPLETION DATE COST B.A.R.S. ACCOUNT,NO. X071 ESTI MATED'LIFE INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY .E� /EPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L. ENTRY REFERENCE DATE tnp INITIAL DEPARTMENT FILE VERIFIED BY PROCESSED BATCH NO.- CITY OF EDMONDS. C2/NEW ADDITION RETIREMENT ASSET INFORMATION SHEET ASSET NO. ADDITION TO ASSET NO. '53_000(0()�L_ 01-30- C/ o DESCRIPTION SERIAL NO. FATION 1� TK\ DEPT. NO.- PURCHASE ORDER NO�. PURCHASE ORDER DATE COST B.A.R.S. ACCOUNT NO. .ESTIMATED LIFE Ics INITIATED BY DATE *PROJECTNUMBER PROJECT COMPLETION DATE COST _�LIQ-Y(o APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT -REOUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY M/DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L.'ENTRY REFERENCE DATE kyp) INITIAL DEPARTMENT FILE VERIFIED BY PROCESSED BATCH NO.- CITY OF EDMONDS NE ADDITION RETIREMENT ASSET INFORMATION SHEET ASSET NO. Z ADDITION TO ASSET NO. 15Z00(o0)-- ct-30-clD DESCRIPTION SERIAL NO. LOCATION cI DEPT. NO. PURCHASE ORDER NO. PURCHASE -ORDER DATE COST PROJECT NUABER PROJECT COMPLETION DATE COST 4/01 B.A.R.S. ACCOUNT NO. 000 (o 3 ESTIMATED LIFE 15) INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY a/DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L., ENTRY REFERENCE DATE VERIFIED BY PROCESSED BATCH NO. - w,p) . ANITIAL DEPARTMENT FILE eo� 000 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT 8 c) 1�) Public Works o Planning a Parks and Recreation o Engineering June 15, 1992 STREET FILE Bjorn Thuesen 432,Third Avenue South Edmonds, WA 98020 LAURA M. HALL MAYOR PETER E. HAHN DIRECTOR Dear Resident: On Juno 12, 1992 you were notified of a possible water leak in the water system. Our most recent reading of your water meter indicates unusually high consumption and/or a current water leak in the system. Please check for leaking faucets, toilets, pipes etc., as no billing credit is allowed on these items. If you have an questions regarding this matter, please call Utility y Billing after you receive your billing statement at 771-0241 or Water Maintenance, 771-0235, extension 349 or 347. Sincerely, Q. -, � 4, �/'o Ron Holland Water/Sewer Supervisor RH/l k FOLLOWUP/TXTWATER 0 Incorporated August 11, 1890 0 '3-7 .4, '6 z ONDS, �.CONSTRUCTION PERMIT APPLICATION OWN'IE-R NAME/NAME OF BUSINESS BJORN THUESEN, INC. cr W z MAILING ADDRESS 22 Main St. STRE 0 3 CITY LEPHONE NUMBER Edmonds 7 775-1953 NAME D.. A. Hermand Co. ADDRESS 111416-Slater Ave. N.E. t� CITY .[TEL7EFHONE NUMBER Kirkland 82 —2763/774-1953 NAME BJORN TIRTETEN, INC. cc ADDRESS 0 322 Main St. cc CITY TELEPHONE NUMBER z 0 Edmond k I 775-1953 STATE LICENSE NUMBER BJORNI*225BZ Legal Description of Property - include all easements CITY OF EDM U0. MIT ZONE N �31EA 3 0 f)/J 10 7 JOB ADDRESS 3rd Avenue South #W 'PT, 1� LEGAL DESCR CHECK SUBD NO. LID NO, C RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP APPROVED BY 1 0 V EXISTING 1� 11 REQUIRED DEDICATION PROPOSED — RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED W STREET USE PERMIT REQUIRED 9� LU z SEE ENGINEERING MEMO DATED REiVIEWrBY z W REMARKS,� METER JIZE BUILDING SUPP SIZE FIXTURE UNITS YZ Uj REMRKV I SIGN AREA ALLOWED PROPOSED ENV. REVIEW COMPLETE EXEMPT AjDB NO SHORELINE# VARIANCE OR CU -rNING REVIEW BY DATE SETBACKS —FEE FRONT IDE REAR HEIGHT, LOT COVERAGE z z z I REMARKS 5 1 .­ A 0. P­ -7( 6, 0 V b CH ECKED BY 2-9501 1 TYPE OF CONSTRUCTION V— /MR, 1 CODE HEIGHT i�� I 06 SPECIAL INSPECTOR REQUIRED AREA OCCUPANCY GROUP��/, OCCUPANT LOAD 0 YES REMARKS PROGRESS INSPECTIONS PER UBC 305 z z hd AM Y� _PLAN CHECK FEE 3160 BUILDING 1020 1<140 PLUMBING MECHANICAL GRADINGWILL SURCHARGE bSTATE 0,S7 ENERGY CODE PLAN CHECK DEPOSIT 1 --- TOTAL AMOUNT DUE ATTENTION APPLICATION APPROVAL THIS PERMIT I AUTHOR 'Z ES This application is not a permit until ONLY THE signed by the Building Official or his WORK NOTED Deputy; and fees areyad, and receii t is I NSPECTION acknowl dged In spac, irovided. :� DEPARTMENT /I CITY OF 4 N;ATURE bATEZ EDMONDS ::11 AVK� 771-3202 114 de RL Y: A It- rfz N KO N 1 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor 102-87 7 "0TY`0Ff,E?0 NDS USE PERMIT ZONE NUMBER !9 D04PI CONSTRUCTION PERMIT APPLICATION jOB OWNER NAME/NAME OF BUSINESS ADDRESS 4301- 3rd Ave. South BJORN TRUESEN, INC. LEGAL DESCR CHECK DIVISION NO. LID NO, cc w Z MAILING ADDRESS 271IN r ___7_ .0 322 Main St. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP CITY TELEPHONE NUMBER APPROVED BY Edmonds 775-1953 EXISTING 140 REQUIRED DEDICATION PROPOSED NAME D. A. HERMANS CO. RIGHT OF WAY CONSTRUCTION PERMIT REQUIREr)V W ADDRESS STREET USE PERMIT REQUIRED W L) 11416 Slater Ave. N.E. R VIEW BY SEE ENGINEERING MEMO DATED Z W cc CITY TELEPHONE NUMBER Kirkland 1827-2763/775-1953 REMARKS NAME BJORN TRUESEN, INC. X ADDRESS A.- /A,-)) A Z L) 322 Main St. METE? BUILDING SYPPLY SIZE FIXTURE UNITS CITY J=TELEPHONE NUMBER W .z 0 Edmonds 1775-1953 REMARKS STATE LICENSE NUMBER BJORNI*225BZ SIGN AREA ENV. REVIEW D B N64a Legal Description of P roperty - include all easements ALLOWED PROPOSED COMPLETE EXEMPT GA (show below or attach two cc pies) SHORELINE # Z The easterly 400 ft nor of th half of the northwest -9: quarter of the northeast quarter of the northeast ir L) W (Tua ter of Section 26, TotTrishiv 27 North. Ran2e 3 VARIA CE OR CU Eu- 6�- ?,I PLANNING REVIEW BY o East, W.M.; E)= the 190 feet; Eff,= north and, Uj roads. SETBACKS - FEET FRONT SIDE ICI REAR HEIGHT LOT COVEF��GE Z ._TR X R C C-T 262703-1-010-0002 REMARKS � Ipr �r-C� Fx_1 NEW RESIDENTIAL 0 PLUMBING A FADD/ALTER El COMMERCIAL MECHANICAL APT. BLDG. REPAIR SIGN EXCAVATE FENCE DEMOLISH OR FILL I— x CHECKED-H Y-6ce 956i TYPE OF CONSTRUCTION ICOD I AhQ E <3 HEIGHT �;A _FT) 1 0 _y_ N CARPORT swim REMODEL GARAGE POOL SPECIAL INSPECTOR AREA OCCUPANCY OCCUPANT WOODSTOVE/ REQUIRED � 0 YES C Nn GROUP LOAD F__j RETAININGWALL/ F INSERT RENEWAL - -R"E-M ROCKERY A PROGRESS INSPECTIONS PER UBC 305 ;E cc a5 LU 0 114A) rRIECk- c2o\z NUMBER OF STORIES NUMBEROF AFA M94 co (a 2 DWELLIN� Bldg. C) 7 10 UNITS_ &,'07 - NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) M E IYEMb A Le D! /?-A /89 M'.-IlEiple RM 2406 PLAN CHECK FEE BUILDING Li J—/- 7.� C? /700 PLUMBING Kf "/7 &c-T41C17_q, 6:)WA�f eq#270/37 MECHANICAL AERM)r This PeTmit covers work to be done on private property ONLY. GRADING/FILL Any construclipUkin the publiQ domain (curbs, sidewplks, dri, wgYs�i-r�g�&60es,-etc.fv)iltlfequiruep-irate�pbrmission. STATE SURCHARGE Permit Application: 180 Days Permit Limit: 1 Year - Provided WorR is Started Within 180 Days ENERGY CODE Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify, defend and hold w harmless the City of Edmonds, Washington, its officials, 2 employees, and agents from any and all claims for damages of cr < X whatever nature, arising directly or.indirectly from the issuance of this permit. Issuance of. this shall not be deemed to PLAN CHECK DEPOSIT I/V71 permit 0 modify, waive. or reduce any requirement of any city ordinance nor I . imit in any way the City's ability to enforce any ordinance TOTA L AMOUNT DUE provision." 271 '? 3 —1 I hereby acknowledge that I have read this application; that the information given is correct; and that I am the owner, or the duly ATTENTION APPLICATION APPROVAL authorized agent of the owner. I agree to comply with city and state laws reTI t* n onstruction; and In doing the work authoriz- a I gC THIS PERMIT AUTHORIZES This application is not a permit until eb, ed ther y _ person will be employed In violation of the Labor ONLY THE signed by the Building Official or his Code of t State of Washington relating to Workmen's Compensa- WORK NOTED Deputy; and fees are paid, and receipt is -tiQn. InSAIce. INSPECTION acknowledged in space provided. IGNA R ENT) DATE SIGNED DEPARTMENT i4ant 9/27/89 CITY OF OFFI�*051,ldyeNATURE ATE 1Z EDMONDS APYWION 771-3202 RELE*D SY- DATE I IT UNLAWFUL TO USE OR OCCUPY A BUILDING 0 R STRUCTURE /,<-- _�F/, UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL - File YELLOW - Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK - Owner GOLD - Assessor 102-87 Ew CITY OF EDMONDS USE "il I I PERMIT ZONEt NUMBER CONSTRUCTION PERMIT APPLICATION joB ADDRESS Aow--- 3rd,Ave. SO. OWNER NAME/NAME OF BUSINESS BJORN THUESEN,. INC. LEGAL DESCRIPTI1P7EqEE_K7SION NO. LID NO. Z 30 MAILING ADDRESS 322 Main St. CITY TELEPHONE NUMBER PUBLIC RIGHT F WAY PER OFFICIAL STREET MAP. �, 0 TESCP APPROVED BY lEdmonds 775-1953 EXISTING - - i V REQUIRED DEDICATION PROPOSED NAME D. A. Hermans Co. RIGHT OF WAY CONSTRUCTION PERMIT REQUIRE Z cr W UUJ ADDRESS STREET USE PERMIT REQUIRED:' Uj Z E U 11416 Slater Ave. N.E. Z REVWW SEE ENGINEERING MEMO DAT BY ED/ cr CITY TELEPHONE NUMBER Kirkland 827-2763/775-1953 REMARK S// NAME 7% BJORN TITUESEN, INC. T R E It ADDRESS r, ZrlOk KL-_j2,,0 322 Main St. MEIER IZE BUILDING SUPPLY SIZE FIXTURE UNITS cc CITY _T77ELEPHOI�E NUMBER 21 C: Uj 0- Edmonds' 775-195" RqMAR U STATE LICENSE NUMBER AF Q BJORNI*225BZ SIGN AREA ENV. REVIEW ADB No r� Legal Description of Property - include all easements PROPOSED COMPLETE EXEMPT (C(C - t12�111 Z 2 Ithow below or attach two copies) easterlv 400 f t. of north half of thp northweqt- i SHORELINE # quarter of the northeast quarter of the nortbeast of Section 26, Township 27 North, Ranp-p- VARIANCEOR.,CU PLANNING REVIEW BY DATE _quarter East, W.M.; EXCEPT the north 190 feet; and, EXCEPT _j W roads. SETBACKS -�FEET toll I 11 HEIGHT LOT COVERAGE Z FRONT SIDE RE yc> Z 5 262703-1-010-0002 REMARKS �4 CL DNEW FRI RESIDENTIAL PLUMBING �, Ll CC> ;r�,\j 1 -7 C,, ( ADD/ALTER 1:1 COMMERCIAL MECHANICAL A REPAIR APT. BLDG. SIGN A P &A) D A2 3 5 0 K7eh 4/97/% 1- EXCAVATE FENCE D CHECKE OF CONSTRUCTION CODE HEIG�,H DEMOLISH OR FILL x _FT) �.TYPE V- HF,_ So CARPORT swim REMODEL El GARAGE POOL EA OCCUPANCY OCCUPANT ElWOOD STOVE/ r7 RETAINING WALL/ PEQUIRED. 4_3 YES-,-..,' 0 No GROUP LOAD INSERT ROCKERY RENEWAL RE A tRKS �/Jqw C/V k 2c) PR FSS INSPECTIONS PER UBC 305 Z W W C 7," NUMBER OF STORIES.. NUMBER OF D 2 DWELLING 1UNITS (Bldg. D) 12 0 NATURE OF WORK TO BE DONE (ArTACH PLOT PLAN) &,erMLbgiT&w lay/dR9 Multiple RM 2400 -IN . uTT-Ai:u= VALUATION FEE PLAN CHEU FEE !4c, A A T I BUILDING 4LIoi-4m' ­ - -_ - i -1i U1N1rA07_ PVUM bit I I I , <46.40M &xm)r V7112 WJ3 7 MECHANICAL " I r 1 This Permit covers work to be done on private property ONLY. GRADINGIFILL Any constructiop on the public domain (curbs, sidewolks, drivew . ays, marq . yees, etc.) will require separate permission. STATE SURCIQ Permit Application: 180 Days Permit Limit: 1 Year - Provided Work is Started Within 180 Days ENERGY CODE =A "Applicant, on behalf of his or her spouse, heirs, assigns and w successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, Z4 - It' m employees, and agents from any and all claims for damages of < whatever nature, arising directly or Indirectly from the issuance of this pe mit. Issuance of. this permit shall not be deemed to PLAN CHECK DEP2!� \&_/A4T iiv7q 0 - 0 modify,,walve or reduce any requirement of any city ordinance T nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNi-PQ" provision." I hereby acknowledge that I have read this application; that the 'APR_GVAL information given is correct; and that I am the owner, or the duly k)�TE N TtgN\ A10PP-10AT16N authorized agent of the owner. I agree to comply with city and THIS PERMIT state laws regulating construction; and In doing the work authoriz- ed thereby, be in AUTMOWE$,�,, \,'.1hoapp,�8aAn is no"rmit until by the Building no persoinyv�l employed violation of the Labor ONLY-JHE signed Official or his Code of tA State of Ashington relating to Workmen's Compensa- WORK NOTED Deputy; an.1 fees are p_aw\a4 receipt is wInce. 1��PECTIO* aAndwfddOed in Oace provided. SIGNATO 0 T!��`AGENT) DATE SIGNED DEPARTMENT esident 9/27/89 C1 I TY OF A 7W ED MONDS - ENTION S. A .3 I�Y )ATT7� WeLE D: B`Y I T IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE 7.� XZZ� - / E I UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Insp I A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor 102-87 7. CITY OF EDM CONSTRUCTION PEgj OWNER NAME/NAME OF BUSINESS BJORN THUESEN, INC. MAILING ADDRESS Z 6 -322 Main Street Edmonds NAME D. A. Ifermans Go. ADDRESS 11.416 Slater Ave. N.E. CITY Kirkland NAME BJORN THUESEN, INC. IPLICATION LEPHONE NUMB 775-1953 ELEPHONE NUMBER 827-2763/775-195 322 Main Street a: CITY 7TTFLEPHONE NUMBER Edmo.nds 0 775-1953 U STATE LICENSE NUMBER BJORNI*225BZ Legal Description of Property - include all easements (show below or, attach two copies) Z 1 The gag2ter y' 400 ft. of north hgilf of t-hp rinri-hups (L 5; quarter of the northeast quarter of the northeast quarter of 9t-ri-ion 2115, Township 97 North Range 3— Fast, W.M.; OCCEPr the north 1§0 feet; ard, WEPT roads. LU 71 +Cc T 262703-1-010-0002 ff] NEW RESIDENTIAL El PLUMBING E� ADD/ALTER COMMERCIAL MECHANICAL ElREPAIR APT. BLDG. SIGN EXCAVATE FENCE E] DEMOLISH OR FILL (—x—F CARPORT swim REMODEL -GARAGE POOL WOOD STOVE/ r7 RETAINING WALL/ C- INSERT I —I ROCKERY RENEWAV:) RE 01 L) Y) NUMBER OF STORIES NUMBER OF 2 UNIT BIdA.A)22 NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) Multiple RM 2400 USE 'W*VRMIT ZONE NUMBER JOB ADDRESS 430 3rd Avenue South #A -EGAL DESCRIPT I CHECK SUBDIVISION NO. LID NO, PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP EXISTING (0,,!9 REQUIRED DEDICATION APPROVED BY PROPOSEE�:: RIGHT OF WAY CONSTRUCTION PERMIT REOUIREDf STREET USE PERMIT REQUIRED, SEE ENGINEERING MEMO DAT "E" BY REMAFIKSg Ah" METER SIZ V it IBUILDING SUPPLY SIZE 211 I cc z a Z W Ir LLI SIGN AREA ALLOWED PROPOSED ENV. REVIEW COMPLETE EXEMPT ADS NO t SHORELINE # VARIANCE OR CU PLANNING REVIEW BY SETBACKS — FEET "ET— HEIGHT, LOT COVERA91E Z FRONT SIDE REAR REMARKS A, L- '�;O - V C - -7 I — / , _ - tO, ^� , TYP A ONSTRUCTION CODE Lj 0 I ---- I GR-O-UP-NIT JOCCUPANT .REQVIRDO C NO LOAD EMARKS PROGRESS INSPECTIONS PER UBC 305 Z 5 PLAN C H ECK FEE, BUIILDING PLUMBING,'— N #-SMir7W 6WA&C 671/27P/37 MECHANICAL This Permit covers work to be done on private property ONLY. GRA155INGIFILL Any construction on the public domain (curbs, sidewalks, STATE'SURCRARGE driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit Limit: 1 )�ear - Provided WorK is Started Within 180 Days ENERGYCODE :.I!-71APptrca-4, al'f-bf hisNr her spouse, heirs, assigns and S ,-49-r,essors injnte,�eSt,..agreeNt% indemnify, defend and hold 'hdtnqless flAeNCity—of-��E-dm6n $n s, Washington its officials, E employees, and agents from any and all claims ior damages of r z whatever nature, arising directly or Indirectly from the issuance of this permit. Issuance of this permit shall'not be deemed to PLAN CHECK DEPOSIT modify,,waive or reduce any requirementof any city ordinance nor I - imit In any way the City's ability to enforce'any ordinance TOTAL AMOUNT DUE vyMon." -pr, I hereby acknowledge that 11have read this application; that the .information given is correct; and that I am the owner, or the:duly ATTENTION authorized agent of the owner. I agree to comply with city and state law I s regula Ing construction; and In doing the work authoriz- THIS PERMIT AUTHORIZES ed thereby, no 'Irson will be employed in violation of the Labor ONLY THE Code of t�he eof Washington relating to Workmen's Co.mpensa- WORK NOTED r INSPECTION DEPARTMENT SIGNATUIA� T) DATE SIGNED ide n t 9/27/89 OF ".11 - - EDMONDS NT 10 N 771-3202 IT IS UNLA�VFUL TO USE OR OCCUPY kBUILDIN6 OR STRUCTURE UNTIL A;,-hNAL INSPECTION HAS BEEN,"MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. 102-87 600 #VN/ ,7.7^1) 50 1 APPLICATION APPROVAL This application is not a pe�mlt until signed by Ahe Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. 0 L�'If IGNATUP12/E DAT,�, RELE S BY. DATE ORIGINAL — File YELLOW — Inspector PINK — Owner GOLD — Assessor E (--IT,-,, np Fni�f,,ONDQ B j '�LD I N G-I D 'E,";:,, h ivi L-i'41 A P WORK A jj!-.� i-� 7-- CALL 2 BUSINESS DAYS BEFORE YOU DIG 1-800-424-6666 IE 1 -.1 - "'c I, ; . � C NlN , . E C�)NC / FIBEPGLASS oVEKLOW 51 Op.G[ ON OF SECTION 26, TOWNSHIP 27 NORTH, RANGE �3 EAST, W.M., SNOHOMISH COUNTY, WASHINGTON 1 9 LF CEDAR FENCE PER DETAIL _j BOLLARD SEE DETAIL I ___ e) : 5907�—'-� —Ex. 8'SS ---------- __--VALVE VAULT F ? IF 16 02 �m 0.� I ,F I 2-FM— F A-,F.E I I EX. ASPHALT EX ASP.ALT -0 EX CONDO 8'lJL'D'ING` 7 LS #5 SITE PLAN SCALE: 1"=5' EX. BLDG #432 5 2.5 0 5 10 .............. SCALLE IN FEET 2 —rAI V FrNrE PAII q IPPI`IRTI,; (SIMPSON OR EQUAL), TYP. 0 TOP IAIL 1111TI 2x4 CEDAR TOP RAIL----\ AT POST . T, 2x4 CEDAR RAILS (2) (TYP.) FINISHED ,,-PT F-ENCE POSTS. SIDE MAX SPACING = 6'-O'OC -12" 0 CONC SONOTUBE FIG 2.500 PSI) MI =%IA'rlr%kl AT CONC qsw- CPA--E 2" CLR 9. 2- CLR (TYP SECTION NOTES, I FACE FINISH SIDE TOWARD ADJACENT RESIDENCE 2 SEAL ALL WOOD WITH TWO COATS CEDAR TONE PRESERVATIVE 3 FASTEN FENCE MATERIALS WITH COATED DECK SCREWS 1 '\ DETAIL - WOOD FENCE i--) NOT TO SCALE — ROUNDED CONCRETE CAP — 4" GALVANIZED IRON PIPE To BE FILLED WI TH CONCRETE AFTER INSTALLATION AND PAINTED SAFETY YELLOW NOTE, DAM MODEL BOS-4X-66RY WITH J-HOOK CAP (OR APPROVED EOUAQ MAY BE SUBSTITUTE:D FOR BOLLARD FABRICATED ON SITE. SUBMIT PRODUCT DATA SHEET FOR REVIEW. '2-'�\ DETAIL - FIXED BOLLARD NOT TO SCALE ,4--, -acd, o m CL .�c z �d �u :10 rol rn i z 0 -n (1) �- a < tz z ==! T z rn 0 In < m<z x 0 C3 w Lu cc co LL co Lu z 0 0 0 �- z LL W u- RECEIVED JUN 2 9 2012 DEVELOPMENT SERVICE, COUNTER C. H. —E I"=5' I �E N/A 40 t' SHEET L85-F ,'-MT. OF SHEETS ESIGA-304 FIELD VERIFY LOCATION AND DEPTH OF EXISTING SEWER PRIOR TO CONSTRUCTION. INSTALL NEW 48" MH TYPE X WITH TOP SLAB, MH RING AND COVER TO MATCH EXIST. GRADE. FORCE MAIN INVERT TO BE 0.10' INSTALL 90* BEND EXIST. 5' CHAIN LINK FENCE ABOVE SEWER INVERT AT MANHOLE EXIT. WITH BLOCKING EXIST. POWER POLE \,�, � TEMPORARY CONNECTION 010e� SEE NOTE 8 BELOW. 30' PATCH PAVEMENT FOR INSTALLATION OF NEW FORCE MAIN. EXISTING >0- ASPHALT TO BE CUT IN A NEAT LINE AND TACKED BEFORE PATCHING. PATC TO MATCH EXIST. SECT N��. 1Z MINIMUM 4" CRUSHED ROC 2" ASPHALT CEMENT CLASS B. 165 LF. 4" PVC 51 FORCE MAIN ___� ,70 LF. 4" PVC FORCE MAIN EXIST. 2t ROCKERY TO BE 'REPAIRED AS REQUIRED /ASPHA/LT DR/IVE FM M M IN. EXIS ASPHALT DRIVE-4 EXIST. HOUSE EXISTING G AVITY LINE TO BE PLUGGED AT\tp APPROXIMATE LOCATION BOTH MANHOLES AND tp EXIST. SANITARY SEWER ABANDONED IN PLACE. SEE GRAVITY LINE NOTES 11 AND 12 BELOW. EXIST: 6' WOOD FENCE TO BE REPAIRED AS REQUIRED - i L A , / , / / / . /�� 1 7' _7` APPROXIMATE LOCATION EXISTING 4" C.I. FORCE MAIN CONNECT NEW 4" PVC FORCE MAIN TO EXISTING LINE. INSTALL BEND WITH BLOCKING AND FITTINGS FOR CONNECTION AS REQUIRED. FIELD VERIFY LOCATION AND INVERT OF EXIST. LIFT STATION EXISTING FORCE MAIN. VEHICLE ACCESS TO TOP ELEV. 19.37' BE MAINTAINED AT ALL TIMES. LEGEND: NEW 4" FORCE MAIN _SS— EXISTING SANITARY SEWER <:=P EXISTING SHRUBS EXISTING SANITARY SEWER GRAVITY LINE FORCE MAIN INVERT TO BE 0.10' ABOVE GRAVITY LINE INVERT AT M.H. EXIT--, 0 4" FORCE MAIN PROVIDE CHANNELING TO 6" DEPTH EXISTING GRAVITY LINE TO BE PLUGGED 48 INCH MANHOLE DETAIL N.TS. EXISTING ROCKERY EXISTING MH TOP ELEV. �fl.32' INV. ELEV. 39.67' PLUG EXIST. 4" C.1.'FORCE MAIN AT MH. Ui W zi W Ir ro +11 0 WALNUT ST. HOWELL WAY GENERAL NOTES: 1. All construction shall conform,to the "1984 Standard Specifications for 8. The existing sanitary sewer system is to remain in operation at all Municipal Public Works Construction" and standard plans as adopted by the times. Tenporary connections are to be made as required to keep system City of Edmonds, and, any requiremnts established, at City,hearings on in operation. Any damage which occurs as the result of the system not this project'.: being kept in operation shall be the Contractor's responsibility. 2. The Contractor shall notify the.City of Edmonds Department of Public I I 9. Existing house and foundation to be protected during construction. Any Works 24 hours prior to and'�uirin�g work o btain all require d. permits I I damage shall be fully repaired by Contractor' prior, to construction. Corttiactor to. obta ' in approval of and coordinate with apartment owner prior to construction. 10. New 48-inch manhole to be channeled to a minimum 6-inch.depth. 3. The Contractor ' shall notify'the,C ' ity of Edmonds Department of Public 11. Field verify that side sewer on existing house is not connected"'to Works prior to backfilling',utiliLies. gravity line to be.abandoned prior to abandoning that line. 4. Existing underground facilities have been shown on these . drawings for the 12. Plugging of sanitary sewer lines to be with non -shrink grout to a�minimum purpose of ' assisti.nq the Contra6tor in locating said facil 14t. ies-in the 12-inch penetration that will assure a watertight and leakproof seal. field. The. Contractor shall betesponsible for checking I actu ' locations ql in the field, and checking with appropriat& agencies,tfiat'may have underground f aicilities within the project limits. The Contractor shall be solely responsible for'Any danage to underground facilities resulting from his operations.' 5. A copy of these'approved plans nest be on the job site whenever I V gz.' construction is in progress. FEB 18 1988 PRINTED 6 A1.1 shrubs/trees that are disturbed by construction shall be root balled prior to.removal and stored on property. Replant trees and shrubs equal ENGINEERING FEB 17 M to existing conditions on site prior to work or relocate as directed by the owner. M& MOOLOON a ASSOOM 7. All pipe and fittings shall be AMM D2241 SDR 26 PW 1120 pressure pipe, Class 160 with rubber gaskets. Force main shall be installed with 18-inch.'minimum cover except as noted Blocking on plan. on all f ittin s to hav�e minimum olf 2, cubic feet of concrete poured against undisturbed soil with,3/4-inch anchor bolts to resist resul , tant forces. Bedding of "Flexible SANITARY SEWER PLAN the pipe shall conform to Section 7-10.3 (09) B, Pipe," which requires 3/8-inch minus sand/gravel mixture placed to a depth of 4 inches FOR under the pipe, -and, extending 6 inches over the crown of the pipe. ROBERT -CASTEEL IN PTN. NEI/4, NEI/4, SEC.26, T.27N,R.31E., W.M. EDMONDS, WASHINGTON 37/� 4:7. Reid, Middleton & Assodates, Inc. _J 0 Engineers 9 Surveyors e Plonners 121 5th Ave. N., Suite 200, Edmonds, WA DRAWN CHECKE DATE FIELD BK. CALE FILE NO. 02-87-121 i W. C. J. S. AN. '88 599/38 1 20' 1 SHEET OF I LAYOUT LEGENP TgAW�5FORMEK5 r?c?m-r xrmK A- 19579 -3-7, s, KvA T ppli ur="r2 Flp-1 —x -0- P0 L- 0 V H V MAKI�- A— 19580 -7 K VA 0 1 '!�' -r 5 - x MAKf::� 5C,H-EMATIC LE6EWP rc2m-r xr-m F?l PP-1 LJOWt2 CA P u "--2 E'r 0 v t VA U L—r!�� 4 1 a x 4 1 5 X3'6" VAULT WITH 41 0 X 4'6 X L- I P e, z UN I-rl-5 1510 A19579 Z UN u ki I T�' r—Fr 7 uNrrl�- F 41T77 4 HowF-L.L. WAY CAE�[,F, rozol or- 1/0 AL, cmc-rpc we�u-r L-25, JACKE�TF-P F21 MAKe FO 50' Or Z" P\,/C 0,Y PUP (OrF-W CUT 9[2) OF: Z" F7\/C E�,Y CUC2-r c )�N- 19 5 7 9 1, A Ar I C 15 C H E ivi N T 15, PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY REV. 7187 N. 4510 5KI2 AV S 1-50UTH COUKI-ry AREA POLE NO. W151/4 S Z6 T VI R DATE Z W.O. NO, 16 8306 REASON FOR WORK fp- 9:0 v I P F, PIZ I I-IGN112 I !:k ENGINEER ?A'rC H E-rT OWG. NO, 06-7614 ro v, 1--ry- 2ARK, AFT-6 DRAFTER U.G. NO. (ZO) u w I SCALE APPROVED DATE WORK COMPLETED FOREMAN ENVIRONMENTAL ANALYSIS X EXEMPT 0 NOT EXEMPT SUBSTATION' W 615-66A-1715- FEES REO'D M YES 0 NO ITEM C PARA. 18 PRIMARY OVERHEAD CIRCUIT NO. I Z— 4057 PHASE 6 . KV 0 RESIDENTIAL U.G. COND. 0 COMMERCIAL ADD CKT.� FT. PH ROAD CROSSINGS ONLY DATE DWG. NO. LEO# REM CKT. FT. PH NET —4 9 7 CKT. FT. SECONDARY OVERHEAD O.H. U.G. COND. kv REVISIONS BASIC FEE $ ADD CKT. FT. PH REM CKT, FT. PH I APPR NO. DATE DESCRIPTION NET CKT. Ft METERICONV. POLE $ PERMITS (DATE GRANTED) PRIMARY UNDERGROUND 0 TREE TRIM 0 RESIDENTIAL 0 STATE 0 COMMERCIAL 09 COUNTY 512HOIQP'�' BASIC FEE $ LEU #' 0 CITY n SECONDARY UNDERGROUND EASEMENTS CR REQUIRED 0 NOT REQUIRED BASIC FEE $ UNDERGROUND PLAT BASIC FEE $ DATE RELEASED FOREIGN CONTRACT$ —1 FT.@$ 0 GTNW JPN # STREET LIGHTING 0 CATV JPN # t FT.@$ 09 JOINT TRENCH GTNW CATV.. WORK IN RIGHT OF WAY 0 JOINT BORE GTN & CATV 0 PRIMARY W AS -BUILT 0 SECONDARY POLE STENCILING t FT. @ $ $ FROM TO APPR NO. DATE DESCRIPTION MISCELLANEOUS FEES��,:;8 TAKE OFF POLE VAULT $ PRE-CONSTR. REQUIREMENTS PERMIT $ M TREE TRIM 0 PUD LOCATOR, .$ 54 BACKHOE 0 ONE CALL DATE TOTAL DUE $ INDEX POLES L09S U.MAP-1 DATE PAID RECEIPT # XFMR -MAP NEW SVCE APPILICATION # LOCATION MAP PAGE DATE PRINTED 7-7 DIOTHS 56 A B I", En ST7BL4KE 0, CHERRY ST sp A'� A VIE%aw --SUNSET UEAV 17 l?K rl �PAM z Ntll SA (A CARU 2 'jKlNGSl0- VNDERWA GLP % z ZA > P > mburs fUARY c "Nc :wv TI I .. $4 ON? ST NNE ST 3: Pr, I list"! > 4 VICINITY MAP 118442 1� :Z 001 1� t 7 I Set the stal�es. 2. Excavate a 4"x4" tren,-h Filter barvier: This sediment barrier may be constructed usiol, Maintenance upslope along the line of Strenj",th nyt,thetic filter fabric. It is denigned 1:(,r low stakes. op inoder�,I,L flows not Lxceeding, 1 cf.4. 1. Silt fencer and filter barriers sliall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Any I T, 1. The freight of a filter barrier shall be a Minimwit Of 15 inches and required repairs shall be made irrimediaLely. shall not exceed 18 inches. Inould the fabric on a silt fence or filter barrier decompose or it become ineffective prior, to the end of the expect 14 2. standard strength synthetic filter fabric shall be purchased ed usable life and Lh,., barrier still be, necessary, the fabric .9hall. be replacLtl promptly. in a continuous roll and cut to the leng to avoid the use of joints (and thus improve the strength art(] efficiency of' ,th of the barrier 3. Sediment deposits should be removed after each storm event. They Flow must be rL-inovod wheii depostita reach approximately orie-l�alf Lhe heirlit 4" 3. The !;t,dws shall be spaced a inlaximum of' 3 fe-A apart at tho barrier (,f the barrier. 3. Staple filter material to 4. Backfill and compact the location and driven securely into tire- ground (mininjum of' 8 iiwhes). 4. Any --edirrient deposits remaining in place after the silt fence or, stakes and extend it into excavated soil. 4. A trench shall be excavated approximately 4 inches wide art(] I, inclies fil*Lr bilrrier Is 1`10 loiiEer required shall be dressed to custforin the trench. deep along tire line of' stakes and upslope from the barrier. witli ttw existing grade, prepared and seeded. .�ktqt:,, ih 5. The filter material shall be stapled to the wooden stakes, and 8 j; inches of the fabric shall be extended into the trench. Ifeavy duty not be qLapled to exi3tine troei. -ast 1/�'-inch lotij, shall be used. Vi I ter material r -44 Wirt. staples at lo shall 6. Thc trench shall be bac%filled and the soil compacted over- the filLor 11"Aurial. 7. If a filter barrier is to be constructed across a ditch line or swale, the barrier shall be of sufficient length to eliminate csid flow, awl the plan configuration shall rejemble air arc or horseshoe with CONSTRUCTION OF A FILTER aA,�MER the isids oriented Up3lope. 8. Filter barriers shall be removed when they have served their useful purpose, but not before the upslope area has been permaneiitly stabi- r_ I >A Tt _-E-1 11 F tF �7 lizLd. 1�7_111401 -7 1 I e7 NV -4,- -Tr� A_ A N --N it A-- 7`� - ......00000" T- I W r;: _,-A I r2 V vV -mAi L_ -rA i 'A LIN r2e42_4, # A W Ir 0, V, 41 "V, V, A e. 1< IF Y? 5 U k_1 PAC E /�A C� 8 7. _1[ I t a L4- T C.-L-i L-V e-p-_P5 ra-z-7.4 -r \r IF, X /r- r- Z r-r-on- 71 '0 G`)QA65-L1NGtD 15WALF= od F_ T. 15. "YP I r I J1 L Iiiiiii - I I 77' A PLANT LIST FOR DRAINAGE SWALES yt;o mr I BOTANT.CAL NAMF COMMON NAME ITT Alopecurus prttensis Meadow Foxtail K/ undinceus Poir. Creeping Foxtail a Alopecqrus ar RedLop Agrotis alba (VI Festuca rubra Creeping Red Fescue Annual ryegrass(es) Lolium ssp., L. meltiflorum /r-r -zA. & Phalaris arundinacea Reed Canarygrass Z K Phleuni pratense Timothy F r- i_� YE 'New Zealan Trifolium repens d' White Clover taken from: for Soil Conservation in the Pacific L all Grasses and Legumes 4- Agricultural Handbook No. 339, North U.S. Department of Agriculture, west and Great Basin States, L Soil Conservation Service, rel)rinL January 1979. J OY12 _4 1w- �,PL_L k LOW WALLS 3 3'.0' 11.1. 01-10, 11.1. 611 106 1.925 0,690 2.790 5.56 4 3'.5. 11.3. 01-10, V-4' M 82 3.036 1.20d 2.513 6.75 1.,. o'.10, V-1u, 8/U 134 5.080 I.M 2.643 6.13 6 o'.10, VUJ IOU ?.656 2.1160 2.06 V.61 I/B lo.!Idia 4.051 1.61 � 11.00 fill 21Y 14.4Y/ !,.52J, 2.624 12.42 9 6 -3 1:-o: 0:. 1, a: 2 .1 a. 0 :a 314 Jil 111111/0 �.300 1.!0112 13.7Ja to 6'-Y' 2'-4* 0'- 10* 3'-1' 1440 243 24.05V VAIU 2.4151 Moir HIGH WALLS 1 0 6:-9: 2-4: 1:-,1: 3"-1: 446 262 24.983, 10.017 2.494 14.81 11 1 -3 2 , -6 1 -a :606 161 31.364 11.720 2.466 16.d6 0.061 '1.443 IV.04 13 V-4- V-lul 1,.,. 4'-4- 1 YOU '1110 40.704 1 V.4/4 2.4/4a 21.44 14 ".9. J,-U. 11.3. V-4- 2uyi '156 !16.1116 21WI �AUII Y3.// Is 9'-4- 31.,. 1,.,. 4'- 10' Mu 1U6 68.OdJ 20.243 2.43V 26.42 16 "I.Y. Y-4- 11.4- 11.1. �420 2�1 7V.164 33.464 2.384 29.ou :7 lo:-4' 3'-6* 25�6 2ul 94.193 39.286 2.413 31.91 a 1 0-10, 271 U 2UI 109.851 4!a.741 2.AU2 34.84 19 1 3 , 1'. 'IY 0 24 24.!a6 52,86 2.356 37.78 20 1:1*9: I'll 60.6d 1 2.340 40.0 4 - .6 6'.2- 3U42 745 141.985 1 1 1 A 33*40' or "0. 0 0 P So 0 171.1 S IS? [C- L ALTEHNATE ONE LENGrH ?-OPTIONAL LUG AND 51101'IT "0 "0" HAUS UAHS - SVACING So SPACING So FIG. 14-1 BAR DETAILS AND NOTATION- LOW WALLS LOW WALLS -Dowels only -No Splices 3 #3 (,.1 18 11.5 - - - 13 a 2'.6 (-,- In 14 (,it 10 0.6 0.070 4 13 vo 18 11.7 - - - #J . I% I I I,,, 111 14 (.at 10 9.9 0.039 5 1301 18 11.9 (h. - - - 03 .:V-7 (". to 14 (-,- 10 11.1 0.067 6 13 (,,1 12 V-11 less - - - 13 . 4'-7 bl. In 14 (,It 10 14.2 0.106 7 13 fai 8 21.1 top 21.7 - - 13 . 4'-8 bn In 14 (,It 10 15.3 0.157 8 14 ('Ji 11 2'.4 cover) 2'.9 - - 13 at V-0 (,it 13 14 01 1 D 18.5 01223 9 14 (al 7 V1 2'.6 V-0 - - 14 x V.0 (-,1 10 14 (In 10 22.0 0.305 10 14 Na 6 21.8 3'-2 - - 14 A V-0 01 16 14 (,it 10 28.6 0.408 HIGH WALLS -Close 0 Tension Lop Splices 10 14 ot 0 2-41 V-10 V. 3 13 (,it 9 V-6 14 x V.0 Vv I 61/a 15 (,it 13 77.S 0.2113 11 14 (,at 6% V-7 ,,.I V-3 13 (m 7Y, 6'. 1 14 al $'-0 (,,- 13-/l 15 (w 13 32.3 0.349 12 #5 VA BY, 3'. 4 4'.8 I'-ft 14(,119 61.7 15 X V-7 (m 111/, 15 W, 13 40.3 0.473 13 05 (,a, 7 V-6 41-11 I'-B 146119 P-I #5 x V-6 Im 1411, 15 Vs- 13 45.0 0.504 14 060,9 V-9 S'.6 2'.0 14 (,at 0 71.7 16 x A'.0 0, 1711, 1.5 6.113 53.8 0,594 is 16 WA 7 Va 3'.11 V-9 2'.0 15 (,it 9 81.4 06.6'.5 W. 15 05 1, tI 13 65.4 0.03 16 41.7 61.1 2'.0 150119 8'. 10 16 . 6'.7 01 13 3 0- 13 73 2 0 * 800 11 17 (,at 7 Ili 4'.5 6'-9 2'.9 15 (", It 91.4 17 . I'll "', * 1:: IS ("t 17 011.2 0.916 Is '761.7 41.7 11.2 2'.9 16 (,it 9 101-o 1, 11 . 7: 111- 3 l/a af,5 1- 11 I o4,7 1.041 19 1861.8 4'-10 8'-0 V.8 16 (,,1 9 101-6 10 . 9 .0 1­16 15 f"I 17 20.11 1.175 20 18 (,it 7 51.1 81.4 V-9 170,9 111-6 #8 x 9*.2 be 14 '501 12 146.7 1.310 APPROVA APPROVED FOR CONSTRUCTION BY Ago;;�r1k QUARKY 6PALL eACKFILL rul Lear In I a (1) Size categories shall Include: Two -man rocks (300 to 600 pounds). 13" in least dimension; to 4t60 6 Three-man rocks (800 to 1200 pounds), 16" in leatit di- menallon; and Four -man rocks (1500 to 2200 pounds), 18" In leaUt di- Z4# mansion. Four -man rocks shall be used for bottom course rock In all 1, 1141 rock retaining walls over 6' in height. Die, 1? (2) The rock macerIal shall be as nearly rectangular as possible. NO stone hall be used which does not extend through the W.1 11 . Then rock material ahall. be hard. sound, durable still Z. free from weathered portions, acama, cracks. cither defects. W The rack density shall be a mininium of 160 pounds per cubic ,4 Cj avoos, foot. a b The retaining wall shall be started by excavating a trenelk, not leas than six (6) locheii or taloare thao oite (1) toot lit depth I)CIOW - FIL-17EK FA15RIC subgrsile fit exclavatioti �ectious or below Lite existing groutid MIKAFI 140 OR level Lot calbanionent sections. Rock selection and placement shall be UUCII that thel'tu Will be itilitlintsin voldn anti. Jai the exponed face of the wtill, tin upen voids over six (6) Incites across In any allarecticto. The flival course . 4V sli,ill I"we a cotitinuoun appearance still bit placed to minimize erosion of tire backfIll. material. Tire larger rocks shall be placed at cite 61 I-ERP. PVC base of tire rockery no that the wall wil I be stable said have a L 4qOO 0 X, NLhblo appearance. The rocks shall be placed In a matiner such that longitudinal axis of the rock shall be at right angles or perpen- dicular to the rockery face. The rocks shell have all Inclining faces slopling to the back of the rockery. Each course of rocks shall be seated an tightly and evenly as possible on the course beneath, Afteruetting eachcouraeof rock, all I vuldubetweei, the rocks &hall be chinked on the back with quarry rock to ell- tj minate any void sufficient to pass a.2-Inch square probe. The wall backfill shall consisi of quarry spalla with I a maximum RDCKF_KY DeTA I U size of four (4) Inchusand a minimum dize of two (2) inclieu. This material shall be placed to an eight (6) Inch minimum J-47. 5. thickness between the entire wall unit the cut or fill ittaterlul. Tire backfill material ahall be placed in lifts to art elevation approximately nix (6) inches below the top of each course of rocks as they are plecalid, until the upperuicaut contrite In placed. May backfill materlal on tire hearing surface of one rock course shall be removed before RULting the next course. Wheat a'sidewalk to to be built over a rock reLiAliting wall, the tell of the wall ithall be nettled atki leveled with u Call Constructed of cement concrete. Class "C" in accordance With the applitable provisions of Section 6-02 of the Standard Specifications. but with reduced witter content resulting in ulutup of riot over two (2) Inches. 1_4 .1-- G IT DATE 9 11-50 VICINITY MAP GRADING AND T.E.&S.C. PLAN �4NIP',,J 1. 11Q11 Ccl'."�, FOR ",Z V IA X ft 2TS �,N CITY PARK APARTMEi\j ITS 1014AL IN NE 1/4t SECT ION 267 T 27 N, Re 3 E.t We M. 9 AAA 9 09 'EDMONDS, WASHINGTON IR W V. 'MAIR -0 -1990 Lovell-salueriand & Associates, Inc. Engineers / Surveyors / Planners / Development Consultants 4-1. M 19400 33rd Avenue W., Suite 200 - Lynnwood, WA 98037 *(206) 775-1591 - (206) 340-0830 DRAWN CHECKED I DATE F.B. SCALE FUX NO. 1876 1GPr__1!Yr Z 11,11P .51 442 10 :z 0 t �A 0 � .'es-00 0001�_�_ //,/v zj\A \11\; , / I GENERAL NOTES 1. LOCATIONS OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL UTIL- ITIES AND IMPROVEMENTS TO AVOID DAMAGE OR DISTURBANCE. 2. ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICA" TIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIRE- MENTS ESTABLISHED AT CITY HEARINGS ON THIS PLAT. 3. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTION BY THE CITY OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 4. ALL WORK WITHIN THE PLAT AND CITY RIGHT OF WAY SHALL.BE SUBJECT TO THE INSPECTION OF THE ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO INSURE SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL OF ON -SITE EROSION HAS PASSED. 7. ALL STORM SEWER PIPE SHALL.BE CORRUGATED METAL 16 GA. .GALVANIZED AND ASPHALT COATED TREATMENT I OR BETTER, CORRUGATED ALUMINUM PIPE, 16 GA. OR PVC. 6. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 1. ALL ROOF DRAINS SHALL BE CONNECTED TO STORM DRAINAGE SYSTEM. 10. AUL W-0017 011;ZAIN 'E��TUO:-:> 5HAL.L. t36 MAWKED WITH 0"x 4" PoeT �5HOWIW6 OEPTH 6�V-410 KAAI�ZKeO 11 4) _sse,� ------------ 77— - . .......... J t Inspection & Sampling Too (by others) Oil Retainer Baffle Vault No. 660-SB 5,750 lbs. I 012-P Diamond Plate Inspection Covers 222-P Diamond Plate Cover 23" 2 1 12" 6'0" 1 2.. 24" 24" --tl 2" 24" 4- 24" — NO. 222P B -*J 2 NO. 101 2P DIAMOND DIAMOND PLATE COVER PLATE INSPECTION COVERS A61 PLAN— BASE PLAN —COVER 7-4-V 2 No. 1012P DIAMOND PLATE IVI e�� NO. 222PDIAMOND INSPECTION COVERS (ki V. I & PLATE ACCESS DOOR OIL/WATER fl HOLE TYP SEPARATION CHAMBER N L INLET EA' END FOR INLET & OUTLET hole each and OIL RETAINER 0/,—BAFFLE for inlet & outlet L A FLOW DIFFUSER BAFFLE 0. 0 GnIT/SL UDGE a.. RETAINER WEIR 11 lo 'F 0.1 48-1/2" 0 0 INSPECTION & .0 0: 0 SAMPLING TEE (BY OTHERS) 1 1 12" 1 0, 1 0 1 7. 5-1/2 23" 21" 4'0" 116" GAI VANIZED STEEL PLATE BAFFLES &WEIR HOTF-: umuTy \/ALJL.—r e5.,';1MANY SECTION A -A SECTION B-B o&z,e,?-6A &-iopirs-t2 -ro r-l-r) INATER/01L SIF-PARATOR (M0D11=1r__tD rO 640 0 W.TG. �A I y-A;?_P 7M_z7 0 U) 0-11 > < CITY PARK APARTMENTS. I N NE 1/4, SECTION 26, T 27 N., R. 3 .1 W. M. EDMONDS, WASHINGTON MAR 3 0 1990 1 —.1 C�lr­