Loading...
432 3RD AVE S.PDFIIIIIIIIIIII 4981 432 3RD AVE S ADDRESS: ��LLL 419271 TAX ACCOUNT(PARCE'L #: BUILDING PERMIT (NEW STRUCTURE) #: �3 _1z COVENANTS (RECORDED) FOR: CRITICAL AREAS #: DETERMINATION: [I Conditional Waiver I Study Required El Waiver CRITICAL AREAS #: DETERMINATION: El Conditional Waiver E] Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit #'s): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: TB L —OC K SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED: STREET USE/ENCROACHMENT PER�If #: FOR: WATER METER TAP CARD DATED: OTHER: t L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc APPLICATION I iAEET FILE for The City of Edmond5 SIDE SEWER PERYaT EASEMENT No . ........................... .............. NEW CONSTRUCTION REPAIRS o OWNER..... Halt-3 .... rl,... R 13 s, on ........................................................ CONTRACTOR .......... ....................................................................................... PERMIT No . ...................... ADDRESS .......................................... LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ -0 -9 NAMEOF ADDITION . ........................................................................................................................................ JUM-, 117a Dya Approved: DATE................................................ ]3y ...................................................................... Ilk 2 )- g-4 CITY OF, EDMONDS I D�f'­;S E W E4' Efl M I T P 8.90 ERMIT STREE17- ILE Address of Construction: Property Legal Description (Include all easements): RECEIVED EDMONDS I SEP, 2 0 188U TREATMENT PUBLIC WORKS In C' Owner and/or Contractor: F2J7Q Ir- Z=2 :UL, C--S. < 'C� /7 '�J State License No 12-'iZ_oLA.2- /7/ Building Permit No. 9?_ J C3 Single Family Multi -Family (No. of Units 0 Commercial 0 Public Invasion into City Right -of -Way: P No El Yes RW Construction Permit No. Cross other Private Property-.0 No 11 Yes Attach legal description and copy of recorded easement I certify that I have read'and, shall comply with all city requirements as indicated on the back of the Permit Card. Date - CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT,)* Permit Fee: �30 Issued By i. )ZA Trunk Charge: 17.5 Date Issued: Assessment'Fee: Receipt No.: Lid No.:- 09 Partial Inspection: Date -Initial. Comments Reason Rejected: Date -Initial Final Inspection Approved: Date!--(--' I nitial PERMIT MUST,BE POSTED ON JOB SITE White Copy: File _G �opy:,lnspector �uff Copy: Applicant Re,sed 3.190 I! Side Sewer Drawing The, city of Edmonds EASEMENT NO - --------------------------------------- NEW CONSTRUCTION REPAIRS R LID NO . .............. .-...AsmT. NO . .................. OWNER ......................................... CONTRACTOR .............................................................. --------------------- PERMIT NO.3.zl�,-ll 'i'4 -0, --------------------------- ------------------- JOB ADDRESS +3+-...3 ----------- ....... LEGAL DESCRIPTION: LOT NO - --------------------- BLOCK NO . ................................... .......... .......... EDMONDS - -------- ------ TREA'I'MENT PLANT NAMEOF ADDITION --------------------------------------------------------- ............................................................. IA S 511 A -A -LA �1*k r-� z \A4-n L430 37 I--- 74,'. 1 432. Lee v 43 q- rr------ A V0 UF:� I EV. 11/78) DATE ... ....... ---- By ----------- "_9 W1 P*01% 04 _­ --- - 1 4 CITY OF EDMONDS kk E S EWE'9" -'PER-MIT"... J,, 9 lo�zl STREET' FILE FERMIT N2 32510- Addross of.Construction: z_ Property Legal Description (Include all.6asements): it RECEIVED EDMONDS I HtA 1-1VIENT I LAI T1 SEP Z 0 15SU PUBLIC WORKS OwnE!r and/o' ractor: r Cont A-,) State License No. -9 Building Permit No. Single Family* -invasion. into City Right -of -Way: No. El Yes M Lilti-Family (No. of Units Z 2— RW Construction Permit No. Comm(�cial 'Cross other . Private Property: 1;[eNo 0 Yes Public Attach legal description and copy of recorded easement I certi-,:y that I have read and shall com"Ply with all city requirements Date as indicated on the back of the Permit Card,.' CALL DIAL -A -DIG (1-800-424'-5555) BEFORE ANY EXCAVATION' OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. 'Permit Fee: Issued By 300� Trunk Charge Date Issued: Assessment Fee: Receipt No. /3os7 Lid No.: L-110 E_S&,101 Partial Inspection: Date Initial' Comment� Reason Rejected: Date —Initial- 1"li( Initial 1 1 Final Inspection Approved: Date7— *`PERMIT MU T- BE POSTED ON JOB SITE Whit, Copy: Green Copy: Inspector' Buff Copy: Applicant Re�ised 3,190 Side Sewer Drawing The. City of Edmonds NEW CONSTRUCTION g' OWNER— .............. ---------------------- ----------- ----- --------------------- * -------- '-'o - ,q LZ- ....................... .................. JOB ADDRESS .1 La a x 0 0 0 L4 T 1, 0 IA r,,. c-, 0 \14ET WFAI 6, REPAIRS F� EASEMENTNO . ................ --------------------------- LID NO . .................. ASMT. NO . .............. CONTRACTOR............................................ ......... ............. ....... PERMIT NO. X4 LEGAL DESCRIPTION: LOT NO . .................................. I ... BLOCK NO . ............. ...................... ....................................... .......... EDMONDS ........... ...... TREATMENT PLANT NAMEOF ADDITION ..................... ........................................................................... ............... 43 q- --a- 1 4 ; ------------- �— Approvea: I YAO e-� kA Ltv--> -kv 5,or,,a-s e�fz /V PWW-0001-11175 (REV.11/78) DATE ... ....... ................... . ........ CITY OF EDMONDS',,- .,'S1.0.E-.1'SEWER P E R M IT PERMIT �,10 324 9 9 7o I FILE STRtLL Address of Construction: Property Legal Description (1hclude all easements): v e- , ll� C-11 I TREM MENT PLANT I 4t RECEIVED REP A WU pU.BuG WORKS, J OwnE!r and/or Contractor: V �,r- -,U L-2 ',- )r K c- State License No. Building Permit No. 13 Single Family MUlti-Family (N q o. of'Units Commercial Public 11 Invasion into City Right -of -Way: M No 11 Yes RW Construction Permit No. Cross other Private Property: No 0 Yes Attach legal description and copy of recorded easement I certify that I have read and"Shall 60,MPI y-. with all city requirements as indicated on the back of the Permit C�rd. C) Date * CALL DIAL-A-D.IG (1-800-424-5555) BEFORE ANY EXCAVATION * LL �- F OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. Permit Fee: 30 Issued By J3-6 Trunk Charge:-2po Date Issued:. �'- 2-0 -�?O Assessment Fee: Receipt No.:.' Lid No.: !�7,sg Lon Fartial Inspection: Date Initial - Comments Reason Rejected: Final Inspection Approved: Datelf-11 Initial Date -Initial PERMIT MUST BE POSTED ON JOB SITE White Copy� File Green,Copy: Inspector Buff Copy: Applicani Revised 3!90 Side Sewer Drawing The City of Edmonds EASEMENT NO - -------------------------------------- NEW CONSTRUCTION REPAIRS F-1 LID NO . .................. . ASMT. NO . ............ OWNER........................... ........................................ .............. ............ CONTRACTOR ........................ -- ........................ ....................... PERMIT NO. JOB ADDRESS --------- ......... au le LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . ................................... .............................................. .................. .......... EDMONDS ---- ------ ---- - TREATMENT PLANT NAMEOF ADDITION ........................ ------------------- ..................... ------------------------------------------- 117 Lbl a 161 0 CN cok,4 t, " 7 " 0 iA A t4 1A * k e, c-, 0 wu Weil 43+ ---V- 1 1* ) ---------- Approvea: — — Ir I '>,Ao yA t� 6�-v kA U. v,> 1v PWW-0001 -11175 (REV. 11/78) DATE ....... .. ............... ..... . .... W *REET FILE S,10 E -SEWER 'PERMIT, CITY OF EDMONDS F9 ct PERIVIlt -NO- 8248 Address of Construction: F2 Property Legal Description (Include all easements):- 1-k i RECEIVED EDMONDS SEP 2 0'1WU TREAWENT PLANT PUBLIC WORKS ownE!r and/or Contractor: :gtD W-,&i 4 V State License No. 1� 'r d) UPTJ Af C- ZZ iQ Building Permit No. El Single Family Invasion into City Right -of -Way: No 13 Yes /�z Multi -Family (No. of Units -Z— RW Construction Permit No. El Commercial Cross other Private Property ?`C No 0 Yes 0 Public Attach legal description and copy of recorded easement cert, :y that I have read and shall co"'mply with all city requirements as indicated on the back of the Permit Card. �? ' -- Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC,WORKS DEPT. Permit Fee: Ro Issued By a(7 Trunk Charge:— Date Issued- (?_?_C __90 F Assessment ee: Receipt No.: 1.30,57 Lid No.:_'FSR )0 q Partial Inspection: - Date —Initial — Comments. 1// Reason Rejected: Date —Initial Final Inspection Approved: Date? - Initial PERMIT MUST..BE POSTED ON JOB SITE;.** V�­ J, White Copy: File Greert C / opy: Inspector Buff Copy: Applicant Revised 3/90 Side Sewer Drawing The City of Edmonds EASEMENT NO . ....... ------------------------------------ NEW CONSTRUCTION REPAIRS F� LID NO . ................. . ASMT. NO . ..... ............ OWNER................. ----------------------------- -------------------- ........................... CONTRACTOR ... ........................................... ............... 7: ................ .... PERMIT NO. &a.+E JOB ADDRESS IZI) LEGAL DESCRIPTION: LOT NO. � ...... ........ ....... .., BLOCK NO . ................ ........ ............ ....... ................. I-- ---- ---------- EDPAONE)S ........... TREATMENT PLANT NAMEOF ADDITION ....................................... - ------------------------------------------------------------------------------ 1j, �7& N 0 LN 0 0 WET WEAl 418 Mot P"Pre-, W 37 1 3 I I -- 74,'--�- 1 YAO e-�v � n�k-N Uvt> 1,o -',,A �, r- I& -1L PWW-0001-11/75 (REV.11/78) t 432. e, -:3-- --c- 1 3c) 1 43 q- -.0- 1 4 ; L---P. =-! - Approved: DATE ....... .... Byz-�, ............... City of Edmonds Critical Area Notice of Decision Applicant: M .1 ov FO( 0/1 S Property Owner: (?0 *P— C)"CIO-5- Critical Area File C/2/� -2� 0 0 9 0 (C) s- Permit Number: -:)0 t-2- 0 5-Og Site Location: Parcel Number: 00 -7 C�cf 0 0 0 120 S-0 0 Project Descriptio n: Vonditional Waiver. No critical area report is required for the project described above. —C there will be no alteration of a -Critical Area or its required buffer. 2. X�- The proposal is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. The proposal is exempt pursuant to ECDC 23.40.230. EJ Erosion Hazard. Project is within erosion hazard area, Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. F� Critical Area Report Required.* The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40-120, Mitigation sequencing; 2. The'proposal does not pose an unreasonable threat to the public. health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordancew.ith ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. E] Conditions. Criti cat Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). R Reviewer J &Z a4�� Signature �, 2— . Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 City of Edmonds Critical Area Notice of Decision Applicant: Property Owner: Critical Area File Permit Number: Site Location: Parcel Number: Project Description: L-'4 X2\— \��Conditional Waiver. No critical area report is required for the project described above. ftw I op, There will be no alteration of a Critical Area or its required buffer. Ifn 2. ,�S�,The proposal. is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. F—I Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I . The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; till 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. �Q--Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. r—I Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). I keviewer �Signature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 Zone ylrA-� �� Corner'- or B :APP�R)VEL) BY LANNING 4"lvl--U \ - __-__-�-_--_-_ --_--_ Required Actual ' / -~A CONFORMED COPY J�11050542 2 PGS 118/Mi 05�m SNOHOM SH COUNT , ESH-010NGTON NO EXCISk TAX REQUIRED Return Address: MAY 18 2011 City of Edmonds �IRKE 81EVERS, 6n000rMil GounlY ffeasurff 121 - 5th Ave. N. Edmonds, WA 98020 WRKE SIFVERS ACCESS AND UTILITY EASEMENT Property Address: 428, 430, 432, 434 3rd Ave S., Edmonds, Washington 98020 Assessor's Property Tax Parcel Nos.: 00799DO0110100, 00799000110200, 00799000110300, 00799000110400, 00799000110500, 00799000120100, 00799000120200, 00799000120300, 00799000120400, 00799000120500, 00799000210100, 00799000210200, 00799000210300, 00799000210400, 00799000210500, 00799000210600, 00799000220100, 00799OM20200, OD799000220300, 00799000220400, 00799000220500, 00799000220600, 00799000310100, 00799000310200, 00199000310300, 00799000320100, 00799000320200, 00799000320300, 00799000320400 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, P Avenue Condominium Association, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a sanitary sewer lift station and appurtenances, over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction, operation. maintenance, repair, reconstruction or replacement of said sanitary sewer lift station and appurtenances, together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is more particularly described as follows: A UTILITY EASEMENT OVER, UNDER AND ACROSS THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, WM, SNOHOMISH COUNTY, WASHINGTON BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED AS -CONSTRUCTED CENTERLINE OFTHE LIFT STATION WET WELL, FORCE MAIN, VALVE VAULT, OVERFLOW STORAGE VAULT, ELECTRICAL coNmurrs AND ENCLOSURES; COMMENCING AT THE SOUTHEAST LOT CORNER OF THIRD AVENUE CONDOMINIUM, AS RECORDED UNDER RECORDING NUMBER 9110315001, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. THENCE NORTH ALONG THE EAST PROPERTY LINE N 00'38'39" W 10.57 FEET TO THE TRUE POINT OF BEGINNING; THENCE N 73019'03" W 34.47 FEET; THENCE N WI 1'39" W 73.16 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 33.68 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE RIGHT, HAVING A RADIUS OF 30.00 FEET, THROUGH A CENTRAL ANGLE OF 64'19'54"; THENCE N 1905 1'45" W 44.11 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 25.21 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 20.00 FEET, THROUGH A CENTRAL ANGLE OF 72ol2'24"; THENCE S 87'55'5 1" W 58.98 FEET; THENCE N 68043'16" W 31.64 FEET TO POINT "A"; THENCE S 85013'4 l"W 76.82 FEET TO THE TERMINUS OF MS CENTERLME DESCRIPTION; TOGETHER THAT PORTION OF SAID NORTHEAST QUARTER OF S17CTION 26, BEING A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE; BEGINNING AT SAID POINT "A" THENCE N 00'40'09" W 23.40 FEET TO THE TERMINUS OF THIS CENITERLINE DESCRIPTION; SAID EASEMENT SHALL EXCLUDE ANY EXISTING BUILDING STRUCTURES, NOT INCLUDING SCREENING FOR ELECTRICAL EQUIPMENT, THE SAID LINES OF SAID EASEMENT TO BE EXTENDED AND SHORTENED AT INTERSECTIONS WITH BOUNDARIES OR CHANGES IN DIRECTION TO TERMINATE ON THE BOUNDARY LINE OR ON ADJOIMNG SIDE LINES. TOGETHER WITH: AN ACCESS EASEMENT OVER AND ACROSS ALL ROADWAYS AND PARIUNG ACCESS AREAS WITHIN THE LIMITS OF SAID PROPERTY AS NECESSARY TO OPERATE, REPAIR, REPLACE AND MAINTAIN THE SEWER FACILITIES DESCRIBED IN SAID UTILITY EASEMENT. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. See attached Exhibit "A" TIEE CITY agrees to restore to substantially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any future permanent structure over, upon, or within the permanent easement. DATED THIS I DAY OF 6 20 11 STATE OF WASHVqGTON) )SS COUNTY OF SNOHOMISH) I certify that I know or have satisfactory evidence that L /-/-,( # - is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument, on oath stated that (he/Itej was authorized to execute the instrument and acknowledged it as the of 3' Avenue Condominium Association to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. -4 Dated ...... ..... ...... . ........ (Signature) (Seal or stamp) ............. ........ Title My appointment expires ...... ... ..... A PORTION OF SEC 26, TWP 27 N, RGE 3 E, W. M. IN SNOHOMISH COUNTY, WA. EX. BLDG #434 VANHOLE OVERFLOW NOTE: PERMANENT SEWER -STORAGE VAULT EASEMENT IS 20 FEET IN WIDTH, CENTERED ON IS 85'13 1 41 11 W CENTERLINE OF CITY'S 76.82' OVERFLOW STORAGE VAULT, WET WELL, VALUE VAULT, WET WELL N 00*40 09 FORCE MAIN, MANHOLES, ETC, 11 ' 23.40' UNLESS EASEMENT CONFLICTS POINT A" - ul-) WITH BUILDINGS (OTHER THAN VALVE VAULT CONTROL CONTROL SHELTER). IN THOSE In SHELTER INSTANCES WHERE CONFLICTS O�— OCCUR, DIMENSIONS ARE SHOWN. DIMENSIONS SHOWN 9.5' IN 6 84 3'1 617W ___L31 ARE TO THE NEAREST 0.5'. - �64' WHERE DIMENSIONS CONFLICT WITH LEGAL DESCRIPTION, THE LEGAL DESCRIPTION Ln SHALL TAKE PRECEDENCE- EX. BLDG #432 u') 72*12'24" FS_ 87-55',51 W L 25.21' 58.98' R 20.00' 7. CENTERLINE OF IN 19*51'45" W 7' --L44.1 lJ_ 2 0 FORCE VAI� EX., BLDG #428 �:64*19'5V L 33.68 7n r)r) 1'3� _84*1 173.16' (.141IN 73-19'03" WI __7 34.47'r— POINT OF _'-9. 5' 24 50 25 0 50 BEGINNING—"" 3RD AVENUE S SCALE IN FEET 12507 BEL-RED ROAD S4Vrr-- ivi Scole 0 EXH1131T "A" go E. WA 98005�2500 1"=50' CHS ENGINEERS, L L C TEL W5) $37-3893 FAX (42J? "7_v94 CITY OF EDMONDS Sheet 0 LIFT STATION #5 E SEWER EASEMENT Drown by ic Project # 450901 Checked by DF Date 03/29/1 CONFORMED COPY J�1105180542 2 PGS 11200 4:15r 13.00 SNOHOMISH COUNT , ASHINGTON Return Address: City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 ACCESS AND UTILITY EASEMENT Property Address: 428, 430, 432, 434 3rd Ave S., Edmonds, Washington 98020 N 0 EXCISE TAX REQUIRED MAY 18 2011 K KRIKE SIEVERS, 6riaofflOd CounlY f(easurer 1)" K�PKE PIPVERS Wo ___ Assessor's Property Tax Parcel Nos.: 00799000110100, 00799000110200, 00799000110300, 00799000110400, 00799000110500, 00799000120100, 00799000120200, 00799000120300, 00799000120400, 00799000120500, 00799000210100, 00799000210200, 00799000210300, 00799000210400, 00799000210500, 00799000210600, 00799000220100, 00799000220200, 00799000220300, 00799000220400, 00799000220500, 00799000220600, 00799000310100, 00799000310200, 00799000310300, 00799000320100, 00799000320200, 00799000320300, 00799000320400 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, 3' Avenue Condominium Association, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a sanitary sewer fift station and appurtenances, over, across, through, and below the -following described property, and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said sanitary sewer lift station and aRpurtenanc , together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is more particularly described as follows: A UTILITY EASEMENT OVER, UNDER AND ACROSS THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, WM, SNOHOMISH COUNTY, WASHINGTON BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCREBED AS -CONSTRUCTED CENTERLINE OF THE LIFT STATION WET WELL, FORCE MAIN, VALVE VAULT, OVERFLOW STORAGE VAULT, ELECTRICAL CONDUITS AND ENCLOSURES; COMMENCING AT THE SOUTHEAST LOT CORNER OF THIRD AVENUE CONDOMINIUM, AS RECORDED UNDER RECORDING NUMBER 9110315001, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. THENCE NORTH ALONG THE EAST PROPERTY LINE N 00038'39" W 10.57 FEET TO THE TRUE POINT OF BEGINNING; THENCE N 73019'03" W 34.47 FEET, - THENCE N 84011'39" W 73.16 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 33.68 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE RIGHT, I -LAVING A RADIUS OF 30.00 FEET, THROUGH A CENTRAL ANGLE OF 64019'54"; THENCE N t905 1'45" W 44.11 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 25.21 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 20.00 FEET, THROUGH A CENTRAL ANGLE OF 72-12'24"; THENCE S 8705 5'5 1 " W 5 8.98 FEET; THENCEN 68*43'16" W 31.64 FEET TO POINT "A"; THENCE S 85'13'41" W 76.82 FEET TO THE TERMINUS OF TFIIS CENTERLINE DESCRIPTION; TOGETHER THAT PORTION OF SAID NORTHEAST QUARTER OF SECTION 26, BEING A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE; BEGINNING AT SAID POINT "A" T14ENCE N 00"40'09" W 23.40 FEET TO THE TERMINUS OF THIS CENTERLINE DESCRIPTION; SAID EASEMENT SHALL EXCLUDE ANY EXISTING BUILDING STRUCTURES, NOT INCLUDING SCREENING FOR ELECTRICAL EQUIPMENT. THE SAID LINES OF SAID EASEMENT TO BE EXTENDED AND SHORTENED AT INTERSECTIONS WITH BOUNDARIES OR CHANGES IN DIRECTION TO TERMINATE ON THE BOUNDARY LINE OR ON ADJOINING SIDE LINES. TOGETHER WITH: AN ACCESS EASEMENT OVER AND ACROSS ALL ROADWAYS AND PARIUNG ACCESS AREAS WITHIN THE LIMITS OF SAID PROPERTY AS NECESSARY TO OPERATE, REPAIR, REPLACE AND MAINTAIN THE SEWER FACILITIES DESCRIBED IN SAID UTILITY EASEMENT. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. See attached Exhibit "A" THE CITY agrees to restore to subsAtially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any future permanent structure over, upon, or within the permanent easement. DATED THIS 'I DAY OF 6 4:�4,�, 20 d STATE OF WASHINGTON) )SS COUNTY OF SNOHONHSH) 11 - - I certify that I know or have satisfactory evidence that 4LLV1,-) / e� L is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument, on oath stated that (he/tej was authorized to execute the instrument and acknowledged it as the of 3' Avenue Condominium Association to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated ..... -I'VI ...... 17.-/1 ............ (Seal or stamp) (Signature) P Title , � 61-A." My appointment expires 7 "r, C-t- ... ... ..... Zone__Eh� Corner P Flag_t�_ APPDOVED BY LANNING Setbacks R Leguired Actual NO Front no C Sides 7 -14 6--2 ).— Rear no 1� 0 Other 5: CAU ��'N ?,,1 1 4 ol' r, tr�—� 4�*49.)-71 1-00 /ovv. 040' L4 m P, a //IJV 5L- -9 A/ 4-L L INV. r J L"U, I I nT -I FT-r --7LL =H L/ L F- -d� J,/ a Ez CIE pi-E-1 D JUN 2011 E E T T. , �r CITY,,,CF EDIIM,,-��,,S-S Co 7 V4 s I ST fuNAL 0'/0 7-1 DA-1 w :: z 3A(4 10 V// 4 4- /::� Z 5� _-:::5 4f 7 /5, 040 IM, lj ON -72 73 e el, -7 75 1_140 ID9; W-- : - 9 7, 2' 3/4, vj 2.10-447 1.2o 0.89 4 4.23 12.7 2.41 3.29 "' 31 26,bi 3.61 6.91 a '45 46.1 4.81. II.Ij 10 106 - - 'vel. ul WaLer head per 100 ft. of pipe 20 2 J/2 3# -a" rel Lou Vol LAM Vo-lLw 1.49 1.01 -86 .27 . .63 .12 2.23 2.J4 1.29 .57 .94 .26 .57 .0 2-98 1-68 1.72 .95 1 2A ' L4u Yel Ld�i -YlLau - 45 .16 -SZ -OS 6-01 17-9 3.72 5.50 2134 1.44 1'57 .677 .!96 12 24 7.22 .65 .08 .43 15 24.9 4.,4.6 7.71 2.57 2.02 I.ag % I.IS 03 18 9. 37.6 5.60 11.8 .3 .78 3.21 3.05 2.36 1:41 .11 S2 .05 20 10-8 50. 6.69 16.5 1.86 4.28 2.8) 1.99 I-W .51 .98 17 .65 .07 .49 3*PIPE' '12.0 63.9 1.72 2 % 9. 7.44 19.7 4.29 5.21 3.IS 144 30 ' 9 'o 30-1 5,36 7-W) .03 .70 1 Is :24 .78 .10 1.01 .66 1 * -51J .04 '31 .49 .02 3-bO 3:43 2.50 1.2a, 1 '29 .67 .11 .65 .05 .4) 1.09 Is .81 .31 .03 35 .57 .03 31-15 41.8 6.43 10.b 4.71 5 17 -2.89 j�.Ao Ob 1.6) 96 .61 1.30 .64 .04 40 61' �5-9 7.51 14.7 S-SI 6:91 3-3S 2.40 2 .2s .97 :11 -77. o6 e PIPE --zpj1- '71 14-88 71-44 8-58 18.8 6.)0 1183 1 N? _5 .119 .0, o4 Jo 16.70 9.6S 23-5 7.08 10:9 -4�10 2.68 1-03 1.74 1.30 ..,82 -05 .57 .01 55 .90 10-72 28.2 7.87 13.3 .4) 1. W - 3.85'. 3.02 1.32 1.95 -19 102 .10 1.46. .06 .62 .02 11-78 33.8 .98 .07 68 .03 8.66 16. 0 4.7A -54 .24 1* 4.61 3-3s 15 .11 1.56 2.17 *6S 1.62 .29 L'28 �.26 5�51 3.69 Las 1 65 1-06 -09 :74 .04 2.87 40.0 9.44 IS6 -7 13-92 46.7 1 0.23 21.6 239 .16 .74 1.7o 5-74- 6 S3 4.02 2.19 2.60 .90 1.9s 34 1.41 .19 4'0' 1*11 2,60 .90 :40 70 1.14 2 .10 .7 .04 15.01 S3 9 .1 75 1.22 I. ? 1 11-02 2 ;.9 6,21 7.56 4.36 2.53 2.82 1.53 .22 2 53 282 1.02 1.02 2.00 .47 1.66 �; .11 .85 .05 80 1.31 10.06 60., .13 .91 .05 6 11.80 28 2 17-16 9 69 .25 669 8.64 4. 29, 3-CH 1.21 - 7.17 9.82 2.27 .54 1.79 5-01 3.13 68.2 12.69 12'0 85 1.39 .15 96 .06 90 1.47 18 77.0 13.38 35.3 1:02 .2J .30 3.25 1.41 2.32 .6U 1.91 7.65 11.1 5-36 3.71 3.49 1.54 .34 2.6o .16 .07 19-3U 84.6 14-71 39.5 95 J-55 .18 1.08 .69 2.o4 ,3g 8.13 12-5 5.70 3.81 3.69 1.66 2.62 J6 2.17 8.61 ]).a .07 100 1 '63 .19 1.13 _08 14-9S 43.7 6-03 4.61 3.91 1 .42 -92 2.92 .85 2.3o .47 9-08 15.3 6.17 3.07 4.12 2.04 2.93 IJO 1-79 .23 1.25 .10 IS-74 47.9 120 1.96 .27 1�36 17-31 57.3 9.56 16.8 670 5.64 4.34 2 .96 2.42 .53 10-5 -31 3.25 1-03 a, PIPE 130 2.12 .31 1.47 .13 18-89 67.2 20.2 7:37 2 5S .57 6-81 4.77 2.82 3.57 US 2*81 11.5 23.5 8.04 140 2.29 .36 1.59 20-46 78.0 .15 -90 .04 150 2-0 22.04 89.) .0 7.89 5.21 3.29 3.99 1.45 3.06 bo 12.4 27 .3 8 71 8.79 S-64 381 4.22 .41 1.70 160 2.61 .46 1 80 .17 .96 :04 23.6 - 1.02 1.68 13.4 WS 3.31 .93 9:31! 10.� 6-05 4'32 4.54 1.93 3.57 14.3 35.7 10-00 1.07 .19 .05 15� 2.77 .11 1.92 .21 1.08 12.0 6.51 4.93 4.87 2.19 3.82 1 23 15.3 40.4 10.7 13.6 6.94 534 5.19 .05 180 2.94 .57 2.04 .24 1.15 .06 190 3-10 2-47 4.08 1 �37 16.3 45.1 11.4 16-0 7.36 625 .63 2.16 .26 1.21 .07 IV PIPE 2OU 3.27 .70 2.27 5.52 2.75 4 33 1.51 17-2 50.3 12 '1 16.8 7.81 6 18.2 55.5 ' :58 3-OS 3.07 4"60 .29 1-28 .07 220 3-59 .83 2 44 34 12:7 1.70 18.6 8.24 7.28 6.17 3.39 4.84 1.88 19.1 60.6' 13.4 20) a.68 -1() -08 -90 .03 240 3.92 .98 2.67 .41 -- 1.53 S.36 650 3.73 3 ]1 2.06 21.0 72.4 14.7 24.9 9.35 10.0 7.14 -10 -98 .03 260 4.25 1.13 2.119 .47 1.66 .12 1 -06 .04 280 4.5o 1.30 4.45 22.9 85.5 5-62 2.44 16.1 2 . 10.4 11.8 7.79 3.11 300 4.90 54 1.79 .13 1.13 .04 1.48 333 :62 1-91 3.22 6.13 2.91 24.9 99.2 17.4 11-3 13.7 8-44 6.07 6.64 .11 1.22 o5 320 5-13 1.66 3.56 .69 2.05 .17 1.31 3.28 18.8 1 112.2 IS.7 9.09 6.95 7.15 ).8s 20. 1 4 3.' 13.0 17.9 .0t, �5-44 1.87 3.78 .76 2.18 -19 1.39 .07 12, PIPE 360 - 5.7 7 9.74 7.90 7.66 4.37 21.6 48.4 13.9 20.1 22.9 '()'40 8-88 8.17 2.07 4-OD 86 2. 380 6.19 2.28 4.22 30 -21 1.47 .07 .4.93 A-S 14.8 22.5 11.00 9.96 8.58 3.50 94 2.43 .24 1 5$ 6.44 2.5 4.41 103 2.60 .25 j:63 -08 1-08 .03 450 7.20 3.1 -09 1.14 24.2 60.2 15.6 24.9 11.70 11.0 9-jo 6.1s 25.6 66.7 16.5 27.7 12.5 .04 5.00 1,29 2.92 .32 1.84 .11 1.28 .05 5OU 8.02 3.8 5.56 1 36 3.19 - 11.2 9.59 6.58 26.6 73.) 17.4 30.6 13-0 13.4 10.10 732 550 U-82 4.5 6.11 .39 2o4 -13 1.42 .05 -- - 1 86 3.32 .46 2:24 1.56 19.5 36.7 13.9 16.7 11.49 9.)l 21.7 46.1 .16 o6 t"T 9.62 53-6.1 65 2.19 3-115 .54 2.45 -18 1.70 650 10-40 6.2 7.22 16.2 20.3 12.6 11.) 23-9 55-0 17.9 24 3 130 13.5 .07 2.53 4.16 .63 2-65 .21 1.84 WO 11.2 7.1 7.78 2.92 og 750 .4.46 2-86 64.4 19.S 28.5 26.0 15.10 IS.8 28.2 I2.o .72 .24 1.99 .10 8-1 B-34 3-35 4.80 .82 3.06 .28 2.13 ow 12.8 9.1 8-90 21.1 33.0 16.40 18.3 22 37.9 .11 3.74 5.10 .89 3.26 .31 2.27 .13 850 13.6 10.2 9.45 4 21 5.'48 1.03 .7 17-60 2JA 24.4 43.0 18-90 24.0 3.47 .35 2.41 .15 900 14.4 11.3 10.0 4175 5-7S 1-16 3.67 950 15.2 26.0 48.4 20-10 26.8 27-6 54.1 21 4 30.1 j7 j. 3o .16 J2.5 IO.S 3.26 606 13� 3-88 43 2.70 .18 IWO 16.0 13.7 11.1 5-66 , 6.'38 - 22.7 33.4 1.40 4.0d 11W 17.6 16.4 12.2 684 :48 2-114 .19 7.03 1.65 4.49 -56 3.13 1200 19.61 19.2 13.3 *04 8 .23 7:66 1.96 4.90 -66 3.41 .27 1300 20.8 14.4 8.6 8.30 2.28 5.31 .76 3.69 .31 1400 22.4 15.6 10-6 8.95 2.59 5. 15W 24.0 -59 - 1 3.98 .88 .37 16.7 12.0 1600 25.6 17.8 1 9.58 2.93 6.12 LCO -4.26 .42 2.6 10-21 18ou 3.29 6.53 1-12 4-5$ .46 2000 20.0 11-50 4.13 MS 22.2 1-39 3-11 .57 2200 24 4 12-78 5.03 8.16 1.69 5.o8 .70 1 4.05 6.00 0.98 1.99 2400 6.2S �8% 2600 15-32 6.7 9.80 2, ..,, .98 2" 10-61 2.73 7.38 1.14 .3000 IJ-41 3.15 7.9s 1.29 3200 12.24 3.58 8.52 1.48 35W 13-05 3.7 9-10 1.65 14-30 4.74 9.95 1 96 38W 4200 15.51 6-3 10-80 2.30 4�W 11-92 2.76 5wu 12-78 3.24 55W 14-20 3.95 60ou old� .d'- tL DUPLEX HYDR-0-GRIND HYDR-O-RAIL PACKAGED SYSTEM SPECIFICATIONS GENERAL Furnish and Install a complaie pumping system as manufactured by HYDR-O-MATIC Pumps, Ashland, Ohio. System shall Include two newage grinder purpp, three 3900 mercury switch level controls. discharge plumbing with hydraulically sealed discharge flango. pump mounting plates with bottom rail supports, upper rail supponfi,. lifting chain, pedestal mount and cord sealing plate lor panel or NEMA IV junction box, to be Inqlallod In factory fabricated basin with cover or on -site concrete basin. A NEMA IIIR weatherproof control box shall be supplied. for- mounting at the sump site or remote from the basin as roqulred� Structure and dimensions to be as shown on drawing 9heet 1 of 1 OPERATING CONDITIONS Each 1pump-shall have a capacity of -44!o:�, opm against.& total head of (170 feet. Pump motor shall be 3 - hp. 1 — phase. 2-10 volts, 54::-20 rpm. �q t�d - cycle. Pump performance - shall - be- as showyn . on curve 4 9 0 Separate specification for pump and motor. SUMP LEVEL CONTROLS Sealed float type mercury switches phall be supplied to control sump level and alarm signal, It furnished. The mercury tube switches shall be sealed In a solid polyurethano float for corrosion and shock resistance. The support wire shall have a heavy Neoprene jacket. A weight shall be attached to cord above the float to hold switch In place In sump. Weight shall W.above the float to effectively prevent sharp bonds In the cord when the float operates. The float switches shall hang In the sump supported only by the cord. Throo float switches shall be used to control level. One for pump turn -on, one for pump turn-off, and one for both pumps turn - on. A fourth switch shall be provided It with alarm. Float switches shall be Model No. 3900. OPTIONAL Alarm light (or bell or horn) to be supplied In separate NEMA III enclosure for mounting at the control box or remote from box. or alarm light mounted on panel enclosure (200,230volt only). Alarm bell or horn shall h4va'slion6ing switch wlth'auto'matic reset. __ Alarm Llgqt Model No. --Alarm Bell. Model No. --Alarm Horn Model NO. —Std - Alarm light mounted on panel enclosure OPERAT16N OF SYSTEM On sump level rise lower mercury swl tch ohall.firit beienorgIzed,., then upper level switch shall next energize and. start load pump. With lead pump operating, sump level shall lower to low swltch.�'. turn-off setting and pump shall stop. Alternating relay shall Index on stopping of pump so that log pump will sign on next operation. If sump level continues to rise when load pump Is operating, override switch shall anorg zo and start log pump. Both load sinli"j lag pump shall operate together until low level switch turns off both pumps. It level continues to rise when both pump& are operating, alarm switch shall anorgize and signal the alarm. where used. It one pump should fall for any reason. the second pump shall operate on the override control and It level rlsos above overrido control, alarm shall signal, where used. All level switches shall be adjustable for level &ailing, from the surface. ELECTRICAL CONTROL PANEL Control panel shall have a NEMA IIIR weatherproof enclosure. A look hasp shall be provided on door. A circuit brookor shall bo provided for each pump pnd a magpoll i c startor with 3 log ovorlooO protection for throe phase operation, or I log overload protection' for single phase operation, shall be supplied for each pump. An alternating relay shall be -provided to alternate pumpo.Qn each successive cycle of operation. Sloners shall have auxiliary contact to operate both pumps on overrido condition. An Interlock relay shall be provided to*automatic-ally ro-connect-the control circuit In case of circuit breaker trip on one pump. H-O-A switches and run lights shall be supplied for each pump. Terminal strip shall be provided for connecting pump and control wires. Additional terminals shall be provided to connoct alarm. A-tran4formor shall be supplied to give 24 volt control circuit. Panel Model No. UL listed. Panel shall have relay with dry controls for alam.telem. connection. CHECK VALVE & PIPING The discharge piping shall Include a HYDR-0-MATIC ball check, valve with hydraulically soaloO discharge flange and a got@ valve for each pump. Discharge from station shall be filled with two NPT couplings. All piping external to the station shall be furnished and Installed by the contractor. SUMP BASIN The factory fabricated basin, where furnished, shall have an Inside diameter of loot and Inches., and a. Oolght of foot and Inches. The basin cover shall be Inches O.D. and — Inch thick. Basin, It stool. and cover shall be sandbla4lod Inside and outside to remove scale, slog, rust, etc., before painting. Basin, If stool, shall be coated Inside and outside with tar base opoxy point for cor- rosion resistance. , See plans HYDR-O-MATIC Pumps RESERVES THE RIGHT TO CHANGE SPECIFICATIONS OF MATERIALS USED IN ITS PRODUCTS WITHOUT NOTIFICATION. 11YORsOmMORTIC. PUMPS' A Division of Wylaln, lin.c. Post OHIO@ Box 327.411012119 30112 Oemmont 4 baney RoWs. Ashland, Ohio 4405 Qwwft — WrJWn Comb U9L Lfto. Us Swe W6 brew*Wk Onleft LIT Ica' Inwnedwol "as — AWvh" Ohio ToWs $6140 ON No ON ONO mmm 0 0 Most trouble -free control ever designed... Bullelln,710.1 C Ct FOR USE IN SEWAGE AND PRACTICALLY ALL CHEMICAL SOLUTIONS! kTENT PENDING ON POSITION OFF POSITION 900 MERCURY SWITCH LEVEL CONTROL * NO VENTED CORDS * #69 DIAPHRAGMS * #&I MECHANICAL SWITCHES N NI CLAMPS 0 NO SUPPORT RODS ENO HOLLOW FLOATS Mercury tube switch is sealed in solid poly- urethane float. Weight outside float holds switch at any de- sired height in sump. Designed for over one million cycles of oper- ation. Solid polyurethane float makes switch leak- proof and shockproof. 3900 REPLACES... ROD TYPE FLOAT SWITCHES, DIAPHRAGM SWITCHES, AIR BUBBLER SYSTEMS... INSTALL AND FORGET! HYDRnOmM IC PUMPS SEP-13-'90 -1�-U 15,121 I"WPESER Hlf-:H--TECH TEL rfj 206- 11304 P01 --j I "T"ET Fil E 00RRW*N-R0$WW COATMO mosim HIGH-Tscs COATINGS, INC. PiCSIMILS TRANgNITTAL PAxt (206) 850-3090 ol TO s COMPANYo ADDRSSS& TOTAL mUMBER Op PAGES INCLUDING THIS COVER BE EnT 4 REQUESTEDs YEG& BY PAX YES, or PHONE - NO =98ACH2 ka�-� % 004J& gft WN #103 Kwt WaWnSW OW (2M M2987 SE-P-13-'90 l"HJ 15. 12 IIIT)'��R3SEEP Ef-D-4 TEL NG: 206-350-�-,Pb-7 4-304 P@2 W i m iF- Fk FF F3P f -MAW :I -JFZC� -r SEATTLE'S LARGEST SEWAGE PROJECT' 7-7 IV� NMI- L a. Z47- ?4j N AVERAGE TEMPERATURE , 34 deg. F rl, 0 SEP-13-"--TJ THLI 15:13 -6SER HIGH-TECH TEL NO: 2,36-25#7 #304 P03 M Lie PRODUCT MTA Wasser MC-Conftfl D E * Single-oomponent, moisture-cu ring, high solids urethane coating F1 0 Chemical and suffide-resistant concrete coating I P T Cold, damp application tolerant coatIng I I 0 High solids, VOC compliant coating N Sealer for interior of now concrete sewer pipe, manways, or vaults. U Ohemlc&l and sulflde-reslstant protective coating for concrete and metal Surface -tolerant coating for darrip or poorly prepared surfaces Mixed with aggregate as sealer for stress cracks Single component - no catalyst mixing errors at humiditles to 99% Can be applied in cold, damp conditions A 0 ill) Can be applied at low temperatures - to below freezing V Typical urethane abrasion resistance and all-around A N performance In harsh environments T 'A '.:.grogdast range of wet chemical resistance E Superior adhasion to concretes and most surfaces easily repaired V00 0,64 mpliant 1. 1 SEP-13—'50 THU 15;14 11-�LOASSER HTCH—TE,_"H TEL. NO; 206­7,50—'Z)� Asil� 96- F'04 MM IfIIIIIIIIIIIIIII 1W 1.0% 8.00 by. volumo: 62,0;t U 10. 1 P.-Ilil Lin ftn 3.5 DWO&I Caverap 9 2.0 mk OFT., 424 M'Cal RarksNifty., Anytima Oar 2.4 hoot minimurn, and baforei 24 hours *rerrperakure feslatance: 2850 F continuous A a Fluh PoIrd: Above 830 F L 9 Cure tInw., MWrnurn 2.4 hours for tewpit or I'lght traffIC. Cure fIMQS V2ry with temperature and 0 humidity. A 0 Chamica! resistance. pH 2-12, HA H,SO,, most aMs, and bases, and rnost Wveft T - SW Ide: 4 morAhs from date of shipment, In undponod o6ginal containors storod at A : ten"rswoe below 851, F R All oudeme must be olatin and free of eny grease, dri or m6esalve ahalklrog. U P On poneMe and stoW, use swSep of brush oft' bUm. or Wd on coftreto. R A loth F A R A On 0a9ft, fiberglass, acrylic, of 9ftat, sand lightly and wipewhh solvent. 0 T Note: MO-OwW will adhm'lonearly any surlan sym wihmt Px"r Suezo P"am- E I Ion. ft is Mewt of amp, risteg. cMIXy surMm, howenr, gmd prooloo dbzes toflowing fte abm pxp=ftn when poWbie. A use mc-Trdmer only P Un spray, roger, or Mon. P in most caim aWly a single coal of 1.5-2.0 mils DFT. Allow minimum 2-hour cure between L CUM. Can be rntxed wfth aggregate and Bombed into stress civIcM As an acla or sunide resistant coating on ooncret I a,. apply Wo 003ts'at-2:0 MILS-DFT-Oer Coil: T This aWing can be wetted or Irrimemd In as Me as 1-2 houm, NeWt Wum MG wetanesmay ba applied to dhmp surfam at YM N;h humidites, AMd applisdan mr N ubvbus vm drW* or pjWko of waw� Awid dpi;IfV a dwnp or wut bru6h or railer back Into to pWrt mpumody for IntrujuctnQ VMter irk 11-40 PaIM9 am camm 2611IIng. Ibis product is lot iroustrial use only. WARNING. Vamr and sotay mW, am harmful. Consult the rraterial sffiety data sheet. use an A mWoved r"pirator In oordined areas when brushing or m1ling. Use a poslt;ye pressure air flow. T hoW vftn eVowd to spray �rnlst or mrspray. Protect skIn and gyps from Contact. This Y product uorrta-.ns organic solvents aM polylsocyanatm' Do not use I you have a chronic or N WleMle maoWn to lsocyansiva or organic soNva"! . MW& WW40* QN1211110 WWO14 Itil W*X% ID bt he 1XM COUt In rM621 Wd WON"11115M WWW PW40ch coaft'S 40 cWtabn w-W Wies ejidW%a rewe4 In wwdw o* Ow "duam shali be limhod, at Wasm Nlah-rwh 0o"no's eptior% ft oltw' re- MWWWtol"dum rMaNtw"no a no W&M:7 W "Witt, "We# Wonrit In ft Inwimc! WwUntolthe mm-Wriorm" prodvft Any W A dew. W In ro OWW 'am dw " expimwm of the G"WWO "I 9b. w sIx =nft lewn IN dalivety datc W'nWvw la aviltr. sweem a fWM* to no* Wfiewr 41011-40 C94V, of #Wn nw-4wrtomwIve im mquired tvm1r shall bw Sqer bw mwmry vdar IN# Wwwly. R WOW Nlgh-TGO CM011P MW4 MD WW WWW1110t ON-31"Ifto ft predum No 3010f w2rwbs. Whadw expMas, 1frPliod, v amiuvory, duch M wwmftfiw Of ffW*2MtMbf111W Of film& b? 2 PW40LAIW KJFAW, "I Ap", In r* 4WW 01100 MAW W0.04O& C"Orvo D� 11W& IV A N owaammN or Inddonlild dLn=, AM aimmvIddan OTMONIIA Mating b dw woo of ft PrW=m maw by Watans Nio-Tech Omonga, *119M& in In tamnfw 1waturo, W in mpwm tD ep"flo h1qWfY' at a6ww". la bmid on data be4eved to be ftflawe- a owevm" ihe pmetweft drod Mvftwaiom awe Mmndbd for Y u= by Imm haft moulolle aW11 wd kn6vv-hov In Ow InOAVY, " lboviole It [a I'a, Buyer W eatlak ItW of the aulwbilty of the arodum for its an pm*jw umb and it Ma be ekotradd Mai &"r hw dwa so, aNa sods adcr000n w1A dBk V"Oan!n envImnrYWh% dwom In P6WW*M 98 V"' W MWOMMn of do% my cauft UNWOMMY qSWIM. umff OP UARILM . Wow'$ usmory an Sny &IM of B'V'kW, Wutfing 66" WMWd wW WUNes M4.1jWM of ItHdRabfity, fm my tw w damW xWM cut of, wnr*Md Mh, or towAng ftm ft um of ft zwduft chd in rn ow eowd ft pwchwa pem k9pad6ld a qhe P"dW= 4W P&K #*Paof Wh6h give -400 10 OM "PA. iA Aft W.IbAtasti: "ASOP 110 16.416 100 MAMRWOR46-11 M IJM1&2ftM1 N..W )qp /3 (' 4-4'? .......... CITY OF EDMONDS .250 5TH AVE. N. EDMONDS, WA 98020 (206) 771-3202 COMMUNITY SERVICES: Public Works a Planning a Parks and Recreation Engineering 9 0 C5 May 14, 1991 STRE"E"'I" f­AHLr-- Bjorn Thuesen Bjorn Thuesen, Inc. Realtors 322 Main St. Edmonds, WA 98020 Re: City Park Condominiums, 430-434 3rd Ave. S. Engineering Inspection Dear Bjorn, LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR On May 10, 1991, an engineering inspection was conducted at the subject project site. Listed below are the deficiencies noted: 1) Parking stall width in front of building "B" not to City standards. 2) Two (2) parking stalls behind and one (1) to the west of building "A" not to City standards. 3) Drain plug at base of stairs to garage, building "A", plugged. 4) Clean asphalt off of all manhole and utility covers. 5) Clean out sewer manholes. 6) Install locking nuts on manhole covers. 7) Grout around pipes in valve vault. 8) Grout all catch basin and manhole concretee extension rings. 9) Clean out debris from oil separator. 10) Downspout on south side of building "B" not connected to tight line. 11) Downspout at southwest corner of garage to building "C" not connected to tight line. 12) Install splash blocks at all downspouts around building "C", which is not connected to tight line. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan Bjorn Thuesen May 14, 1991 Page 2 13) Secure chain link fence to posts. 14) Provide exterior lockable latch to gate at lift station panel enclosure. 15) Enclosure around lift station panel not wide enough. 16) Lift station and system not tested. 17) As -built drawings required. 18) Clean out all catch basins. 19) Lift station telemetry not installed. 20) Repair defective areas of asphalt paving in front of building "A" 21) Parking stalls south of building "B" and building "C" garage (next to concrete retaining wall) not to City standards. Because the olef station and associated equipment have not been tested to date, a separate punch list may be required. The test on the lift station, scheduled for this morning, is only a partial test and is not to be construed as a final test or acceptance of the system. After the telemetry is in place, a complete test will be conducted on the lift station. Before we will consider any additional occupancies, the lift station must be totally operational. We feel that four (4) weeks from today is sufficient time to get the system completed. If you have any questions, please call me. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt CITYPARK.APT/TXTST530 Vor'_ Al btrts S T9,-, FE" ! � E- T F I L E M E M 0 R A N D U M May 10, 1991 TO: Mayor Larry S. Naughten FROM: Gordie Hyde, Engineering Coordinator VIA: Bob Alberts,�i��ngineer SUBJECT: THUESEN LETTERS OF 10-23-90 and 12-18-90 The first letter, requesting street lights, has been forwarded to Bill Stroud, Street Supervisor, as he is responsible for ordering street lights if necessary. The second letter dealt with a request to prune maple trees at the City park. Pat Harris, Park Maintenance Supervisor, had indicated a willingness to work with Mr. Thuesen's subcontractor to trim the trees, which is Mr. Thuesen's responsibility. Apparently, Mr. Thuesen's subcontractor has not responded to Pat Harris for coordination of the effort. GCH/sdt THUSNLTR/TXTST530 CITY OF EDMONDS LARRY S NAUGHTEN 250 - 5TH AVE N - EDMONDS, WA 98020 - (206) 771-3202 MAYOR COMMUNITY SERVICES: PETER E. HAHN Public Works * Planning Parks and Recreation Engineering DIRECTOR F I L E May 1, 1991 Bjorn Thuesen President Bjorn Thuesen Inc. 322 Main Street Edmonds, WA 98020 Re: Temporary Occupancy request of April 25. Mr. Thuesen: I agree that you have made repeated requests for temporary occupancy of your building at 428-434 3rd Avenue South (City Park Condominiums) and that we have refused each time. Each time I explained the project was not sufficiently complete to consider a temporary occupancy. You do not seem to fully understand what our policy is. Let me explain. My staff agrees that our current policies have not changed regarding inspections and occupancy in the past 10 or 15 years. My staff tells me you have been though the process a number of times in the past and do not understand your confusion. That policy is as follows. 1. Once a request is made for "Final Inspection" or "Permission to Occupy" the departments involved in the permitting process are notified (the building department is last to inspect). Each department must grant approval before a Certificate of Occupancy is granted. The building department inspection is usually not scheduled until the other departments have conducted their inspection and have approved. 2. If a request is made for "Temporary Occupancy" the same process is followed by my department. If each reviewing department is willing to release (with or without conditions) , the building official may issue a Temporary Occupancy for a limited period and with specific conditions. So if all reviewing departments agree to a temporary occupancy the building official may issue a temporary pursuant to Section 307(d) of the Uniform Building Code (UBC) . It should be noted that the UBC is a model code and allows for local interpretation. Section 307(d) is not a mandate but offers a method of granting a temporary when justified - thus the use of the word MAY in the text. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan In your particular case, the reviewing departments have not granted permission to issue a temporary occupancy. Engineering and Planning have reported that too much work remains to be completed to consider a temporary. For that reason the building department has not scheduled its final inspection and has yet to determine if the building's life safety requirements have been met. Again, I believe the policy is the same as it has always been. I cannot agree to the issuance of a Temporary Occupancy until each reviewing department agrees to allow that do be done. I hope this will clarify the situation at City Park Condominiums. .�,n)c6 e Richard R. Mumma CBO Building Official City of Edmonds cc: Sharon Nolan, Rob Chave,, Pla Tom VonSchuess Gordie Hyde, En Ron Holland,, Wa, thuesen.rrm ermit Coordinator ing Manager r, Fire Marshal ineering Department-- er Department 6 0 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works a Planning o Parks and Recreation o Engineering 1 890 - 1 94 January 4, 1991 Bjorn Thuesen 322 Main St. Edmonds, WA. 98020 Dear Bjorn, 54 -,? / -!�- LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR 17 STRE" I FILE In response to your letter of December 18, 1990, 1 cannot authorize the lowering of the park access road adjacent to 430 - 3rd Ave. S. The proposal, as I understand it, would have to be approved by the Parks and Recreation Division, Arvilla Ohlde, Manager. My impression is that changes to City parks have to be approved by the Planning Board as well. I would recommend,,that you contact Ms. Ohlde regarding your request. I have talked with Ms. Ohlde regarding having the Park Division crews trim the overhanging maple trees. I have given her Steve Gillis' name and number as well. Thank you for your concern. I am always willing to help in any way I can. Sincerely, GORDON C. HYDE Engineering Coordinator GCH/sdt c: Arvilla Ohlde, Manager Parks and Recreation Division THUESEN/TXTST530 A�� Al Vfirts o Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan B16RN INC., REALTORS VF1 F1 U 322 MAIN STREET - EDMONDS, WASHINGTON 98020 775-1953 December 18, 1990 �'-- I. I FILE Mr. Gordy Hyde, Engineering Department City of Edmonds 250 - 5th Avenue North Edmonds, WA. 98020 Dear Gordy: We would appreciate if you would consider lowering the City Park road adjoining our condominium development at 430 � 3rd Avenue South in Edmonds, the purpose being to facilitate the access of the Fire Department to our project. Also, would you please have the city trim the park maple trees where they overhang our project.. We had a bid from our tree man of $300.00 with the City removing the debris. His name is Steve Gillis, at #742-2926. Sincerelv. BT: pn '46 % CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works o Planning o Parks and Recreation a Engineering ' 8 9 0 - , .9 - December 6, 1990 Bjorn Thuesen 322 Main St. Edmonds, WA. 98020 SMLi: "."w"T FILE Re: Release of performance bond money City Park Apartments, 430 - 3rd Ave. S. Dear Mr. Thuesen: LARRY S NAUGHTEN MAYOR PETER E. HAHN DIRECTOR I conducted an inspection of the subject site this morning to determine if your performance bond could be released on the following work said to be complete: 1) Concrete retaining walls 2) Rockery 3) Storm/sewer lines and catch basins 4) Sewer pump station Based on the inspection, the concrete retaining walls, the storm/ sanitary sewer systems, and the catch basins are not 100% complete. Partial payment cannot be made on the above items and, therefore, money for those items cannot be released. I am recommending $1,800 be released for the rockery and $24,000 be released for the pump station. When the pump station is operational, I will recommend releasing the remainder of that portion of the bond. The total amount of the performance bond that I'am recommending for release is $25,800. If you have any questions, please call me at 771-3202. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt CTYPKAPT/TXTST530 Al berts 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan BJORN THUESENINC. 322 MAIN STREET - EDMONDS, WASHINGTON 98020 775-1953 December 3, 1990 City of Edmorids Building Department 250 - 5th Ave. North Edmonds, WA 98020 Gentlemen: We would appreciate if You would re -inspect the City Park property and release the appropriate money for the improvements installcd last monti, back. , for which Puget Sound Bank has a hold - The improvements installed include a concrete retaining wall, rockery, storm and sanitary sewer, catch basins (some of which are temporarily covered by dirt). The Pump station has been completed except for a cast iron lid. Please mail Your letter of release to: Regan Belgard Puget Sound Bank 1325 Forth Avenue, llth Floor Seattle, WA 98101 with a copy to the undersigned. We would appreciate it if you would do this Post-haste. Sincerely, BT/js a It 0 ".ky BOND RELEASE FORM CITY OF EDMONDS DATE: A2 TO: ENGINEERING DEPARTMENT LYLE CHRISMAN PLANNING DIVISION - ED SOMERS �v7 FROM: Jeannine L. Graf, Permit Coordinator PERMIT# ADB# PLAT# PROJECT ADDRESS 40� . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DEVELOPER/CONTRACTOR , TYPE OF BOND TO BE RELEASED A $ BOND DATE POSTED BOND EXPIRES Please field inspect for the release of the subject bond.. :.If there". are,-4, outstanding requirements, please note in the space provided. OR 2(e _7 0,0 0 00 �5,4411 . ... .... .... . . 3 wa4�0 4. BOND APPROVED FOR RELEASE DATED BOND NOT APPROVED, SEE OUTSTANDING REQUIREMENTS DATED COPY TO FILE COPY TO DEVELOPER/CONTRACTOR BONDREL/TXTRECEPSeptember 10, 1990 LOVELL-SAUERLAND & ASS010%, INC. 19400 33rd Ave. W. Suite 200 LYNNWOOD, WA 98036 Phone (206) 775-1591 WE ARE SENDING YOU ))<"Attached 0 Under separate P�b&?vl`)a the following items: 11 10 • Shop drawings %eprints V.tr—Anr-s�kkN El Samples El Specifications • Copy of letter El Change order El LEE17*1 VF TURZ ffOcTURL ..T�� A&# N --I ATTENTIO��., 10 16 DESCRIPTION DESCRIPTION L-1 WIMP THESE ARE TRANSMITTED as checked below: ��For approval E) Approved as submitted 0 For your use El Approved as noted W0 A requested El Returned for corrections For review and comment F1 0 FOR BIDS DUE 19 REMARKS El Resubmit —copies for approval El Submit —copies for distribution 0 Return —corrected prints El PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: PRODUCT240.2 J�fx,Gmton,Mm 01471. If enclosures are not as noted, kindly notify us at once. M City of Edmonds (71NTER-OFFICE CORRESPONDEN�CE) T . 0 FROM 9 DATE SUBJECT v qh-� RECEIVED 8EP 081989 PuLd'—, STREET FILVI m Oo oze- Uld 0 A- -4AT-e76aq6-2- u r(�. e- Pvv e" —0f--D o e no c�i r 5TA CoDe- ------------------- r ro P- __UAL Ar-10 I /A-- orry 51 -,w" i,�ww ZO r_ola" 15 r Fog, TtA�J -0 0,!�- C) 3.... A 4AIVD5.cA?c1� f6f�-77A� -PiA A-r A30 3P,-7-D 5, v -0 7V 1>6yt 6 r-J eO --- --- ---- - STR EETTIL E- Ix e e de�vv -- ------ - ------ /1)1) z,,j iD L c�. ;4 7 el, I' y 4C� ------ ---- 2 z� ,; /( ft FILE STREil- M E M 0 R A N D U M January 20, 1989 TO: Leigh Francis, Associate Planner Planning Division FROM: Gordy Hyde, Engineering Coordinator Engineering Division SUBJECT: FEBRUARY I ADB AGENDA ITEMS I tem ADB-1-89 No problem ADB-2-89- No comment ADB-3-89 OK; no sight obstruction ADB-4-89 No comment ADB-5-89 Signs OK; question use, as discussed in CRC meeting ADB-6-89 No comment ADB-8-89 No comment ADB-9-89- Sign as it exists creates a sight obstruction. Would be much better if sign could be placed in planting bed on west property line. Change in parking no problem, except rhody in east bed must be relocated or replaced with plants that can be looked over. ADB-114-88' Chain and lock on alley access is not a requirement. Cross sections of site should be provided to assure us of parking lot grades. ADB-122-88 Construct curb, gutter and sidewalk along frontage of 201st St. S.W. for future 36' road section curb -to -curb. -,-/ADB-66-88 - No comment GH/sdt FEBADB/TXTST530 db rq� Aj")P, - FF STRIL,-.- Nr (-(7x11,1r,,vT- APY-117—er--F, Alz,-ilV All-W /V� (�rltlx 1(-:-/Vf— �-2 7 t ' /f VJ IV�7' (�tOwlr //V 32-t'� MWAVr , 4 () , r -N6 //� w , Y� (11VIT-- 7V &Or, Lt)� tl-W—A 12 of?e,1111" 11)1"ellv, fole "e-�O Soo oa,rz) rt, t"? 1-7f I, , 4� yf 4 C/V/ 7- ��ellzzflm LA,( 'tc DRAINAGE CALCULATIONS 13-Sep-89 (Snohomish County) THUESEN APARTMENTS, LSA #1876 Total area, acres I . 2?5 Time of Concentrati on: Cummulative "Flow length Vertical Ground Type Runoff Time of Travel Time f P P t Drop S I o p e Cover Veloci ty T r a v e 1 5.000 13 1.2 9.23% paved 6.23 0.03-" 5.03,- 1 43 2.0 4.65% paved 4.39 0.16 5.20-- 1 TA 9 9 8.0 %-8 paved 5.82 0. 28 1 13 1.0 7.69% paved 5.67 0.04 5.52 1 Piped- (based on pipes flowing full, no pressure) length: dia: slope: n: V: time: total: R: 72 1.00 8.19%* 0.024 Z 7.1 *" 0.17' 5.69 0.25 140 1.00 4.21%* 0.024 5.1,� 0.46 - 6.15 0.2� 15 1 . 00 3. 33%* 0.012 t�9L;:O-* / 0.03 " 6 . 18 0. 25 Time of Concentration, T(c) minutes 6.179 Desj q n st or m , I ( I Oyr -------------------------------------------------------------- Itc i n/hr 2. 316 RETAINED: Area of retained flow, Ar acres 1.295 , Ar sf 56400 Exist runoff coefi, by proportional areas: C impervious areas, < 76.00% approx. 0.90 x 42B64 landscaping, > 24.00% 0.20 x 13536 other 0.00 x 0 other 0.00 x 0 Total Area, sf 56401) Cer 0. 732 Flow off ret. area, Qer cfs= (Itc x Ar x Cer) = 2.195 Compare this flowrate to the capacities of all pipes listed above. Pipes are adequate. Trapezoidal channel flow calculation: 2-year storm intensity: Flow from 2 year storm using modified rational method= Friction factor 0.030 grass lined swale Side slope = 3.0 H : IV Channel bottom slope = 0.50% Channel bottom width = 4.000 feet Depth = 0.292 feet, Top width, wetted 5 ' 750 feet Area wetted = 1.422 sf -' Wetted Perimeter 5.845 feet Hydraulic Radius, R = 0.243 Freeboard sideslope = 3.0 H - IV Top width with 0.750 ft freeboard included 3. 5 i nches Calc'd Discharge, 0 1.95 cfs recd flow Calc'd Velocity, v 1.369 fps/ preferred 2. 008 i n/hr 1.903 cfs,,- 10.250 feet 1.903 Efs 0.500 fps max 9: 5. 54 3 . 9' ' 1 7. 07 P) 0 EXAMPLE: The dashed line shows that the resis- tance of a 6-in. standard elbow is equivalent to approximately 16 ft of 6-in. standard pipe. NOTE: For sudden enlargements or sudden contractions, use the smaller diameter, d on the pipe -size scale. Head loss through check valves varies with types manufactured. Consult with manufacturer for correct v414 ., pp. Appendix: CHART 35 RESISTANCE OF VALVES AND FITTINGS TO FLOW OF FLUMS 0#7"_ZVM A Globe Valve, Open ,Angle Valve, Open Swing Check Valve, FullyOpen C e Return nd los Be Standard Tee Through Side Outlet It, Flr_� Standard Elbow or run of Tee reduced 1A n, 1�_ Medium!Tw-eep Elbow or run of Tee reduced 1/4 a 61141 30 20 U) 5 1) C! Courtesy of Crane Co. 0 77 0 CHART 4 Table of "C" Values for "Hazen and Williams Formula" CONSTANT TYPE OF PIPE CONSTANT TYPE OF PIPE 155 Driscopipe 110 Ten to twelve years old cast iron pipe 140 New steel pipe or tubing Vitrified pipe Glass tubing Spiral riveted steel, flow with lap Asbestos cement Galvanized steel 130 Copper tubing 100 Spiral riveted steel, flow against lap Ordinary brass pipe Thirteen to twenty years old cast Cast iron — new iron pipe Cast iron — tar coated but new Galvanized steel — over 5 years old Cast iron — fully cement lined Cast iron — tar coated over 125 Steel pipe — old 10 years old 120 Wood stave pipe 90 Twenty-six to thirty-year old cast Concrete pipe iron pipe New wrought iron pipe 60 Corrugated steel pipe Four to six years old cast iron pipe Fitting Lres sure Dr p: Listed below in Chart 5 are various common piiping system components and the associated pressure Ic)ss through the fitting expressed as an equivalent length of st x aight pipe in terms of diameters. The inside diameter G ri feet) multiplied by the equivalent length diameters c jives the equivalent length (i�n feet) of pipe. This equivalent le,ngth of pipe is added to the total footage of the piping systenn when calculating the total system pressure drop. These equiVE3.lent lengths should be considered an approximatic-n suitable for most installations. CHART 5 Fabrica,ted Fi,tting Equiv. Length A Runnin g Tee . ................ -FG] ............. 20 D Branch Tee ...................... ............. 50 D 900 Fab, Ell ................ 1-`� - - ......... :* .,-. . . .30 D 600 Fab, Ell ..................... % .............. 25 D 450 Fab, Ell .......................... .......... 18 D 450 Fab, Wye! ................. F-S� ................. 60 D Conventional Globe Valve (Full Open) .... 350 D Conventional Angle Valve (Full OperO .................. 180 D Conventional Wedge Gat(� Valve (Full Open) ................ 15 D Butterfly Valv(� (Full OperV ............................ 40 D Conventional Swing Chec.k Valve ....................... 100 D (See Appendix fc)r further data oi 1 resistance of valves and fittings to flow.) 12. kinetic energy in the water in a pipe because of its mass and velocity If the velocity is suddenly reduced, as would occur by the inuick closure of a valve, this energy cannot be sily absorbed. The instantaneous shock may generate excessively high pressures known as water hammer This effect becomes greater as the velocity is higher and/or the valve closure time is shorter Valves should be opened and closed sloWy Even greater water hammer can be caused by air entrapment. System design should provide ways of preventing air entrapment. Pressure and Surges: Pressure surge may be calculated from Figure 1. The combination of static pressure and surge pressure should never be allowed to exceed the pressure rating of the pipe. NOTE: To allow for cyclic loading effects and surge, Simpson recommends the working pressure be limited to 70% to 80% of the pipe pressure rating. W'locity Friction Friction Loss Velocity F,icti-n Friction Loss Velocity Friction Friction Loss Velocity Friction Friction Loss Gallons Fee I per Head Pourlds per Feet per Hez d POUndS per Feetper Head Pounds per Feet per Head Pounds per per Second Feel Square inch Second Feet Square Inch Second Feet Square Inch Second Feet Square Inch Minute 2 in. 2% In. 3 In. 0.27 0.02 0,0087 0.17 0.01 0,004 1 0.68 0.96 0.14 0.25 0.059 0.104 0.44 0.045 0.020 0.30 0.025 0.011 0.20 =0.400.02 0.01 0.0045 2 5 1.36 0.47 0.20 0.61 0.87 0.08 n- 0.035 -069 0.42 0.59 0035 0.06 0.015 0.026 0.28 0.014 0.0063 5 0.009 7 10 2.04 1.00 0.43 1.30 0.33 0.14, 0.88--' 0.13 0.59 0.05 0.022 15 2.72 1.71 0.74 1.73 0.57 0.25 0.056 3.40 2.59 1.12 2.16 0.86 0.37 1.18 0.22 0.095 0.79 0.09 0039 20 4.08 3.63 1.57 2.60 1.21 0.52 1.47 0-34 0.15 0.99 0.13 0.056 25 4.76 4.83 2.09 3.03 1.61 0.70 1.77 2.06 0.47 0.20 1.19 018 0.078 30 5.44 ' 6.18 2.68 3.46 2.06 0.89 2.35 0.63 0.27 1.39 0.24 0.10 35 1.59 0.31 0.13 40 6.12 7.69 3.33 3.90 2.56 1.11 0.81 0.35 2.65 6.80 9.34 4.04 4M 3.11 1.35 2.94 1.00 1.22 0.43 1.78 0.38 0.16 45 8.16 13.10 5�167 5.19 4�36 1.89 3.53 1.71 0.53 1.98 0.47 0.20 50 9.52 17.42 7.54 6.06 5.80 2.51 4.12 2.27 0.74 2.38 0.65 0.28 60 10.19 19.80 8.57 6.49 -6.60- 2.86 4.41 2.58 0.98 2.78 0.87 0.38 70 2.97 0.99 0.43 75 10.87 22.31 9.66 6.92 7.43 3.22 1.12 4.71 2.91 12.23 27.75 12.02 7.79 9.25 4.01 5.30 3.62 1.26 3.17 r3.97 1.11 0.48 80 1359 33.73 14-61 8.66 11.24 4.87 5.89 4.39 1.57 3.57 1.38 0.60 90 1.90 9 1 1.68 0.73 0 100 10 in� 7.36 6.65 2.88 4.96 2.54 1.10 125 8.83 9.31 4-03 5.95 3.56 1-5.4 150 8 0027 0.01,11 10-31 12.40 5.37 6.94 4.74 2.05 175 i 05 0041 0.017 7.93 6.07 2.63 200 i 16 005 0 0?'� 12 in� 9.92 9.18 3.98 250 ()7 5 0,033 0 0- i -7-01-1 300 350 i 0 09 0,039 1. i9 O.Q 17, i 89 0. 0,0-18 n -0�, ::= 400 2 10 0 14 0,061 '!q n ,)C 0,026 450 056 500 750 11C) 0095 - 1'6 31 7:,, i5 1000 i 06 0.46 .1-17 -;6 0:10 1250 1 81 0,78 5,96 0 7-C) 1500 ig 7, 4 5 i 20 2000 66 � U/ 2500 10.4, 96 3000 11-92 236 1 ",1 3500 13 4 1 3 54 1 53 4000 lluta. 1111�, ililuilliationis avaiiaoie. A-V I 1,,:::> / 54 Cft - C; e-, - &- - ALAQK LgUl _ 4 1"A� ;qjA.4P � A6 - I ,�o (( W" Z 0 W U C4 0 �1. ci'ry OF EDMONDS COMMUNITY SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT A. o Owner: Name Mailing Address City State Zip ­9w Permit No. Issue Date tn _t q -go B. *Contractor: / r 6 UZ (�?o x 4 r N�re 7- < iii Addrels, f City State Zip RRO U.? 'f C_ J o 9J.- 7 K 4 State License Number Tereph6ne -Nu-mber C. e Address or Vicinity of Construction: z/ 3 I> V 'L, Type of Work to be Done: CA2 4 C,1 24 // A -t— D. 0 Work in Connection With: El Sub or Plat El Single Family El City Projects El Commercial Multifamily El Utility E. 0 Pavement Cut: i�l Y El N F. 0 Size of Cut: 3 x 30 APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. S T_[R 7 • Restoration to be in accordance with City Code. • Street to be kept clean at all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Owner This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: PERMIT FEE: _�n - 0 0 ` Time Authorized: Void after days. Restoration Fee: Special Conditions: 1'kvM*39_- Tk_fLx,4 7TP Receipt No.: _Z0 I S; 02 %4v 1 Fund I I I Fee: 199.0c) 04 PPTL (A�t4'L C&M Street Cut Dimensions: $/99— G "4-t- RELEA��.. Date INSPECTED BY Date NO W6RK TO BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. March 1989 RIGHT OF WAY CONSTRUCTION PERMIT ROUTING FORM CONTRACTOR (2A DATE PERMIT RECEIVED WORK ADDRESS SIZE OF CUT: 3 X-30 DATE TO ROY WHITCUTT FOR REVIEW: FROM-ROY TO PUBLIC WORKS: PUBLIC WORKS DATE SENT REVIEWED BY BOBBY MILLS REVIEWED BY BILL STROUD REVIEWED BY ARCHIE BRENA RECE I v i: c) COMMENTS: JUN 15 1990 PUBLIC WORKS ,7� JUN 8 F.Nr;INFFI?tNr, FROM PUBLIC WORKS, ROUTE TO ENGINEERING_ ENGINEERING DATE SENT COMMENTS: REVIEWED BY NOEL MILLER REVIEWED BY DAN SMITH qA r,,(7 FROM ENGINEERING TO PLANNING(For ALL Above Ground Work) PLANNING DATE SENT REVIEWED BY JOHN BISSELL DATE PERMIT ISSUED 4J I q /q 6 PERMIT # qQ - 2-00 (20) - Rev. 11/14/89 lfc R/WFORM/TXTRECEP 890. 194 - CITY OF EDMONDS kECE:1VE-:r) 700 MAIN ST. o EDMONDS, WA 98020 o (206) 775-2525 PARKS AND RECREATION DIVISION APR 3 0 1990 April 28, 1990 Mr. Bjorn Thuesen 322 Main Street Edmonds, WA 98020 Dear Mr. Thuesen: mr.INIFDIN'r� STREET FILE LARRY S. NAUGHTEN MAYOR Since construction commenced this past week on the property North of City Park, a dangerous situation has arisen regarding construction vehicles parking adjacent to the park road exit. This is creating a blind area where drivers exiting the park cannot see vehicles traveling on Third Avenue. I have discussed this with the on -site Project Manager but the situation still persists. Could you please discuss this with your Project Manager and all subcontractors doing work at this location? I would recommend holding vehicles back at least forty five feet on either side of the exit. Your cooperation will be greatly appreciated. Sincerely, ya-t- "N Pat Harris Park Maintenance Supervisor cc Arvilla Ohlde PDan=Sffith--7�— , / o Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 21 0 Lovell-Saueyland & Associates, Inc. Engineers/ Surveyors/ Planners/ Development Consultants City of Edmonds Engineering Dept. 250 5th Ave. N. Edmonds, WA. 98020 Attn: Jerry Hauth Dear Jerry: P FILE 19400 33rd Ave. W., Suite 200 Lynnwood, Washington 98036 (206) 775-1591 Seattle: (206) 340-0830 FAX: (206) 672-7998 March 30, 1990 LSA File No. 1876 As you requested yesterday I have verified the grading quantities on Bjorn Thuesen's City Park Apartments. The calculations in our file show 2631 cubic yards of cut and 937 cubic yards of fill, based on average end areas of plotted cross sections. Therefore the 3,600 cubic yard figure in the grading permit application is accurate. I have also modified the drainage and grading plans to provide dual culverts in the swale as requested. One copy of each of these sheets are hereby forwarded. Let me know if there is anything else you need. Sincerely, 6al a 4 Craig Campbell, P.E. ST R Ei"-: T F I L E CS, er"e e-/V SEP-10-190 MON 10:54 HIGH—TECH TEL NO:206— 7 #297 P01 , nj 9.11 � dmk46NfEsl8TANT OOATINN RECEIVED WASM HIGH—TECH COATIMSo INC. FACSIMILE TRAXSMXTTJW SEP 10 1990 FAXv (206) 850-3090 FN(31NEF.RlNr, DATES TOO Fkx I Loop 6) 1� ss �2_z_ COMPANZ2 PHONES ADDREGSt or FROM$ TOTAL NUMBER OF PAGES (INCLUDING THIS COVER SHEET) REPLY R3QVZSTZDt YESo, BY PAX YES, BY PHONE no A SEP-10-1130 MON 10:55 5`1� HIGH-TECH TEL_ NO: 2M- if 7 #297 P02 ME WOSSER.,,., 8 1 OF- TTIC M C 0 A T I N G 6 (800) MC PAYNT PRODUCT DATA Wasser MC -Tar D E $1 ngl6-component, moisture -curing urethane C ane/M.topooat P Color: Black T I High solids, VOC compliant o oating 0 N Any use where steel or concrete is immersed or exposed to splash zone, high humidity, sewage, or buried environments U Any use where coal tar epoxy has been used and a better finish 19.6lealred Any. field repaint of the above uses where cold, damp, and/or hi�lo, humidities limit the use of typical epoxy or urethane Single.component - no catalyst mixing errors Can be applied In cold, damp conditions - at humidities to 99% A Can be applied at low temperatures - to below freezing ID Superior to coal tar epoxy for heat re313tance, chemical V A resistance, flexiblilty, weathering, and resistance to cracking N Outstanding resistance to salt and fresh water in immersion or T A, ' A splao.. zone 0 Typical urethane flexibility and abrasion resistance E Typical urethane resistance to cathodic disbondment Can be Immersed In one hour - means very short down times Eqslly, recoatable, easily repaired V60oornpliant SEP-10-1130 MON 10:56 HIGH-TECH TEL NO:20 1 6-850#7 #2137 PO4 WASSIR H1214-T&H CO&TINgl Coating 8peciflostion M coal tar epoxy, and other coatings with MC -Tar. 1. Purpoee: To proMe an improved allornative to typical for of GP*xV tar coatings, and one that also has Improved oppilostlon vW Qu ring prop@ Me& 11. ou"M Prsperstlon A. Over bare steel, use SSP04PI 0 Near Milo Blast for Immersion. and SSPC-SP6 Comrnerclal elast to( normal, non-Immorslan or buried Applications. S. On conorele, remoyo Qxcase dirt, grease, and chalk by sweep or water 'blaghg. N C. Over old 00"s. use sweep blast or high pressura water blast 0. Over galvanized steel, surface must be free of grease and Oil. F. Whon used over MC-21no, Use 2-4 mile DFT (Dry Flh T*knew) of MC-21no, F. Over old tW* adherard eMxy tar, use power wash or solvent Mpe. Note: This product and most Wasser ureftmo are designed to adhere to poorly pmpared surfaces such as old paMt, Ughtly adherent rust, and poorly cleaned surfaces; however, lost patchea snould be made when good surface preparation Is not possible. Ill. cming Ap* one or more costs of Wasser MC -Tar by brush, roller, or spray at 4-8 OFT per coal. 1. Use M&Tar at 1042 We to replace 16-20 mile typical oul tu epoxy on steel or 2. Use a-12 mils MC -Tar to replace 40-80 mils hot d1pW tV on oo"te, or burled or non- 3. Use e-1 0 rrJls MC -Tar to replace 40-80 mlls hot doed lar on galvanized surfaces. Q SEP-10-190 MON 10:59 W� HIGH-TECH TEL NO:'2)W-850j-f7 #297 P07 Application Guide N 10 R - 7 E C N C 0 A T I N 18 Waterworks, Wastewater, Pipeline Description Gurface Preparation Mrst Coal 5scona Coat Third Coat Material DFT Material DFT material DFT (am raw 1) Geneiral Stisework ImmerM In fresh or Saft Water 10 MC-Zft 3 MC -Tar 6 MC -Tar 6 Previously PaIrited P11211 MC-Zlnc Spot MC -Tar 4 IVIC-Tar 4 Where Color Is Rimpired 10 MC-Zine 3 MC-Ferrox B 3 MO-Forrox A GIfts, I gm* 10 MC-Zft 3 MOTar 6 MO-7ar Where Cftr is ReWired 10 mo-zww 3 MO-Ferrox B 3 MO-Ferrox A 3 pensto" 10 MCIZLW 3 MO -Tar 0 MG -Tar 6 Fladlel Iftinwe MKI TMOh Rafte 10 MO-Zft 3 MG -Tar 5 MQ-TRr 6 Btftl Eupood to smogs PH 4-11 10 MC-zIM 3 MC -Tar or 6 MO -Tar or 6 MC-Ferrox B 3 MO-Ferrox A 3 PH 2-12 10 MC-Ferrox 8 3 MC-Ferrox B 3 MC-Farrox A Concrm 01gMer BT MC -Tar 6 MC -Tar 6 Over Old Epoxy Tar IFF"i MC -Tar 6 MCTar 6 Pipeline Burled 6 MC-Zlnc 3 MC -Tar 6 MC -Tar 6 IMMersed In Fresh or Saft Water 10 MO -Zinc. 3 MC -Tar 6 MC -Tar 6 Above Ground 6 MC-Zlnc 3 MC-Ferrox Es 3 MC-FeMx A 3 Previously Pointed Ppi MO-ZInc SPot MO-Ferrox B 3 MC-Ferrox A 3 To Repim Hot Tar PPI MC -Ter 6 MO -Tar 6 "Al Wasser systems a r reMMmerKj lor use wfth cath od r "'I"On. Note: I - SUOfte A OW V" & Where blastina Is done the number Is the SM-SP number, lo. SSPC.SP6 Commercial Is 6. b, Where old coatIng Is riot removed the number will be Mi. This IS swoop blast or power wash with spot cleaning or blasting of spot mmabn. c. Blast Track or blaOng of comrste will tM M.T. 2. M Is the dry film thlakrwams. Carmult the IndM" data sh"t for covorago at No DFT AMUNIMMOMM — SEP-10—'90 MON 10; 56 *26� HIGH—TECH TEL NO;206-850#-7 #297 F1W 69M by viplume: 01.0 12.0% "4111111: 10.5 t 0.3 Will M VOO: Lm than P-8 IlWqaI N V00"MP M 6 moo: IGO ft A RmatatillIty: Anytime after +6 hours L Teqxrxture resistance; Wet, 180* F codnuous; dry, 2406 F continous 0 .6 Flash PM: Above 9(r F A T Shoff Igo: a mordhe from date of shipment, In unopened original oontainere otorod at A terriperawres below 050 F p - over bare steel, we SOPO-W10 Near White Moot for immersion, and $SM-$P6 commeraltal R Blast for na"nal, non-Immorelon or buried appiloatlons. E - on concrete, roenove excess, dK groase, vW chalk by sweep or water blaslIng. U R P A 9 Over old ocatings, use swoop blast or high pressure water biast. IF R . Over galvanized steel, surface must be fte of groom and oil. A A e Whon used over MO-ZIna, use 2-4 mils DIFT (Dry Film ThIckriess) of Mc -zinc. C T * Over old t" adherent opxy tar, use power Wash or solvent wips. E I 0 Nots: This Weduat wW mast Wassor utetharies we desWed to adhere to owdy omared surialles such as old N point, 1ghq a wei t nA and pwrl� obaned surfoon; however, IDst patfts should be male when good swim Proporallari Is rM Possible. Oonjiuld IkW Painting liceso A Us$ *AV MC-ThInnor P ApW at 4-7 mile DIFT per coal. Avoid vingle applIcalons above 10 mils DIFT, P On wtool civer MO-Zlrm If possIble. This gives cathodlo pmeatlon If there Is arry mochanical damage. L ours mInImurn 4 hours batwoon ocate st minimum 30% rolatW humMity and 40-9v F. If I humidity Is 10-30% or tomorsturs Is 25401 F. dow more time between coats. Films above 6 mils DFT mquire kwqw dry limea. A can in Immersed after arm hour. If additional aeon are required, Immoraw is permitted between aeou. Tover all salts amd msWs must be washod away befilre fewaft. 0 NoWo ftow MO welhaine fney be appW to 4" audwee at vety MO hurnldMos. Avoid aWiodlon over N obvious wet drW or puddles of water, Avoid dipping a dwnp or wet brush or roller back into the point fopostody kw bm w1oft of time WwA uskv nwm mint lnvo&,dm water ImDtw Wnt con couse aellim. P This product Is for Industrial use ordy. $ 1 fA WARNING; Vapor and spray mist are harmful, Oonsult Me material sM* data shoot. Use an K U appiroved respirslor In confinied are= when brughing or rolling. Use a pooltive pressure air flow T T hood when expoed to spray mist or overspray. PMed skin and eyes from contact. This Y I 0 product oontains organic solvents and poysocyanates. Do not use 9 you have a chronic or N a allergic reaction to Isocyanates or organic solvents. Wanew MW"ToM ContIrW Warrants IN Produm M be bw form OuNG Ill rnamplal VV WoMnOM Mom Migh-T90 Gos"'s am abftmdm wW SWorla azdLmdw rarnecily In wn �&v %OIK Ow Wnducts " be drrilbed, at Wamer fth-'redi CaMrV% aptimn. to either w plaosmortiotiproducts this Warranty ProrWhip nort-vortOormirl products. Any W cWmurOrNoftm"mustbomadebyBuywfmWuwHlgh-TechC*MtnpinwlingrAhngve(S)dapof&WodlswvwyolftdalmW A 40*4 but In me *wM IaW #W 0* #*Iralion of ft aWi=MO "If 1114, w On r"artOw from OW cMWM date, wNdpe vat Is varpw. Ouyoee R tvillm to roffly Wosovir Hkih-Tech OmOrge of such nort-cortbittlar= as mOW hsreir shall ber Buyer from rscwmy under No Worwly. R Wmer HO-Tuh Cafts mom no Www"iles =xwolng the ilmduca, M otherwarrand", whathereWm, WOW, of statutory, A WAn a Woolliness Of "Wchwlsbuiv offloolis for a "rowlar OWWO, "I appl. M OWADWAMW W 11111111011 Od dWGM. T to the use ofthe Mo&M mods by Wasser Nth -Tech Coatings, whedler In Its MftkW Marews. Y win rapanij to spefthVity, or*=#, Is Moll on dmbslWM w be rollaft hmm, ft pmdum &M Wdomdon am IrwWed for uWayewen; M" MlIMMIKIlaroknowintain itlem"ry, Mwitwe" ills Iw "Kicza"Mmof the sumanlyof ft KOM= fm he awn prWar use and It *d be -1 Ow Bwer hu done sm, ath sole diBarefien anal Plak. %terktilom In emAronment. chargea In PMd" alum, oteltmolawn offtarraq cau unufflactaryfesuln. UUM Or WMIL" - Vhmw% MMMV on my akIr" of any MW. WaU&ng "me ba"d Lwon Wwow% nevowme or Wat I"11tv, for aV ba or derrap wWM out of. cotinected wl#v, or mesulling Imm dw um of du Produlft, A9 In MO case ON0041 00 PLrdwe PAN db=W to ft products or part do so wrkm on as& to ft claim. h no swei i OW Wimw be IkWo for consequential or Incklental 14-1100, \%.O� SEP-10-1130 MON 10:5S I ,� HIGH-TECH TEL NO: 2M-650#-7 4297 PM Primma N10-21no MoGt varselial @may to use, ?.In@ doh waft. MC-GR Prlfner/Topo*Qt Scolalty Primerlboating with ohernical resistance for steel and i u a urnlnum. mumemaniormadimim: MC-FerroX 8 Unique MIOX cWInq with m�ny usiss. Boat possible prlmer/ Intermediate on previously painted brIdges and madno steal. Colore and metalflos. WIC -Intermediate Universal prImerfintermediate In marine atmospheres. MC -Luster Intermediate Low gloss, allphatic, long life exterior coagng or colored bass coal under M"lear. Cblcrs and metaillos, = 7=� MO-Shleldcoat Supar color coat, aliphatic long Ills exterior coating. High gloss, chemical resistant coating on structures and floors. All colors. MC-Ferrox A Unique MIOX aliphatic coating. Longest life of any urethane. Many uses, brIdges, chemical, Madne. Colors and metallIcs. MD-Aroehleld Arornatio version of Shleldcost. Hlyh gloss, chemical resistant. I .Interior or clow y exterior MO -Tar MIOX,orreq IN SUPOFoostIng to replace coal tar opogy. Usewith napid Immoralon on splash zone, pipeline, water -works, marine, and pWa�ar mill. Most durable chemical realstant, allplicalo Ou high ?iosson woo(k concmto floors. Long life cloa=at over Mrwstor n'tormudlate and MC-Ferrox A. IndugWial, madno, automottvq. MC-Amdear Same properties as MC -Clear, but for Interior use. 0 3DWSIV C004ingoo MO-CxnSeal Sulfide resistant sealer/coating for concrete pipe colors and clear. MC-ArMereffit] Clew All the properties of MC-Cloar, but repels everything, Ice. madfjng pens. paint. dirt. Very light stable. mc-Aluminum Primer. topcoat In metallic oolors and silver. Recoats weathered galvanized steel. Inoapsulates, rust. Universal costing. Note: All of the gibove p"cta can be applied In cold, damp or high humidity atmospheres wd csn be Immerwd after ofie hour. -29G .AM"'-10-190 MON 10,57 1 R HIGH-TECH TEL NO:206-e5O 0 ? U297 P05 0 H T E C H C 0 A T I N 6 5 BUNGLE COMPONENT MOUSTURE CURE URETHANES Highest Performance Trouble Free Application Maximum Coating Life a ------ 5" Corrosion resistance Can be appliod on cold dump surfews Broadest range of general charrJoal at temperatures below treezing resistance at humidities to 99% Urethane flexibility, weathering and No dew point restriction abraolon roalstance o OutstancIng color and gloss retenflon to Specify - Fewer application delays - Year round application season a VOC oompilant -.,z,_Do9s not require an approved applicator LOVELL-SAUENLAN64 ASSOCIAT' C. 19400 83rd Ave. W. Suite 2090 LYNNWOOD, WA. 98036 LIEU76 VF TURSE0 UL 10 Phone (206) 7 ; 75 -1591 ""IMEb TO _C1171 OF JUN 2 139n NLLT FILE WE ARE SENDING YOU Attached El Under separate cover via — El Shop drawings 0 Prints Plans 0 Copy of letter 0 Change order 0 DATEe� _ JOB NO. ATTENTION RE: he following items: 0 Samples 0 Specifications COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: • For approval • For your use ?� As requested 0 For review and comment 0 FOR BIDS DUE REMARKS El Approved as submitted 0 Approved as noted 0 Returned for corrections F� 0 Resubmit —copies for approval El Submit —copies for distribution 0 Return —corrected prints 19 0 PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: PRODUCT240.2 J� IM, Gtm, M. 01471. If enclosures are not as noted, kindly notify us at once. Af)b M E M 0 R A N D U M June 11, 1991 TO: Dick Mumma Building Official FROM: Ron Holland Water/Sewer Supervisor SUBJECT: ACCEPTANCE TO THE NEW LIFT STATION STREET FILE In regards to acceptance of the new Lift Station for sanitary waste for the Third Ave., Park Apartments. We have inspected this facility and found the following changes are needed in order to finalize this project. These changes are currently being worked on and should be completed in no time. 1. Brackets for floats are to be relocated by pump tech incorporated as per City requests. 2. Locking nuts on electrical panel are missing. When these changes are completed the City will grant full acceptance of the lift station. These changes are to be completed in two weeks. RH/ho cc. Lyle Chrisman NULIFTST/TXTSEWER WEST AssoclATES 7,S - HONG onstruction inspection -RECEIVED e4 . g HydrogeologY o materials Testing o C Geotiechnical Eftgll F,rtn 7 1991 INSPE9TION REPORT *NEE ING t DATE: 7f PROJECT: GENERAL CONTRACTOR: LOCATION: CONTRACTOR'S REP OUR REPRESENTATIVE: JOB NUMBER: R: �)/y,! SUB. CONTRACTO' PERMIT NO: ------- ARCH: SUB.- RER: ENGR* 'llo'll'y v 14 7' 4 +: 7 . . ..... PAGE�—OF-1— HWA 101-90 InspectorS COPY * Pink office cop y - White Job Site COPY - yellow ..w. �.c HONG CONSULTING ENGINEERS, INT.?- 01 %� I o CeotechnlcoJ Engineering 0 Mckterlol Testing o Construction Qualltq Control X FIELD DENSITY REPORT Test Apparatus: Mach. No.: I "1 4, f- Address: .7315 ........... Soil Description: Job Number:— .. 0 T le�r aot A i .. ....... C /S 11: . ....... C �� V/ Date Tested: By: Specified Compaction:. Client: ... ... Compaction Standard: /.�"7-41... . ..... Minimum Dry Density: ... CF ... Maximum Dry Density: . I � ./ X., PCF Attention: .. ... Optimum M.C.: ... . ... 7,0 ............... ........... -3 -5- I Test No. ........... a S /V C.) Location CqA"IL';�t . ......... //S Elevation Iz;7 S'C�- Wet Density PCF 0 Mo i sture Content — % ./f Dry Density — PCF 0 --b ef t 7 Compaction — % �3 / ^1 5, 0, �'- la'I"I -I N Location P /04 FTest g . ...... ......... ....... Elevation zl,63(;� ...... la(5 1 Wet De n sit y PCF 136, 0 1 0 13 9, Moisture Content — % 7, .7,5 4,1 7.3 .......... . Dry Density — PCF 131, 13 D, S IV, 0 Compaction — % 1 /0 0* 1 y 6 11,15' �6 1 IA,5,U /j/' 0 ,A) All tests performiod in occordance with ASTM dow 0 0 M E M 0 R A H D U H May 22, 1991 TO: Ed Somers, Associate Planner FROM: Gordie Hyde, Engineering Coordinator UJ SUBJECT: ADB AGENDA COMMENTS ADB-38-91: Applicant to comply with Ordinance 1924 regarding storm drainage. Right-of-way construction permit required for driveway approach. LAU ADB-43-91: No comment. ADB-45-91: No comment. ADB-46-91: No comment. ADB-51-91: No comment. ADB-52-91: No comment. I ADB-53-91: No comment. ADB-66-88:- Suggested revisions for parking is okay, except two (2) handicap stalls required. ADB-37-90: Final civil engineered site plans to be approved by City Engineer. ADB-123-90: No comment. ADB-31-91: College Place traffic mitigation fee required. Driveway width to be a minimum of twenty-four (24) feet. Incomplete submittal. Engineering will not review. ADB-32-91: Driveway width needs to be fourteen (14) feet curb to curb or show gutter. Access easement to be improved to City standards or remove westerly access. Right-of-way construction permit required for curb cut. ADB-47-91: Applicant to provide proof of public easement from Edmonds Street. Seven (7) foot wide sidewalk required in R.M. zone. Storm detention required. ADB-49-91: Seven (7) foot wide sidewalk required in R.M. zone. ADB-50-91: Storm detention required. Seven (7) foot sidewalk required in R.M. zone. Applicant overlay alley if condition warrants. Existing curb, gutter, and sidewalk to be repaired if condition warrants. GCH/sdt ADBCMNTS.ADB/TXTST530 AT;rj!� � ge-&o / -4�� z 8 9 0 . .19 1� May 14,1991 Ll CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 E COMMUNITY SERVICES: Public Works - Planning - Parks and Recreation * Engineering Mr. BjornThuesen Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 RE: Temporary Occupancy Mr. Thuesen; KF1 I- � -t- ni:- - FILE Receiv ED MA Y L D 1,9,9 1 ENGINEERING LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR in response to your request of May 13, 1 have compiled a list of corrections forwarded to me as a result of inspections on your site. I will break the list into two categories; 1. Those items that must be completed before a Temporary Certificate of Occupancy will be issued and , 2. Those items that have been identified to date that must be completed be for a final occupancy will be granted. REQUIREMENTS FOR ISSUANCE OF TEMPORARY OCCUPANCY BUILDING DEPARTMENT: The Building department is willing to approve temporary occupancy at this time. FIRE DEPARTMENT: On 3/12/91 the Fire Department granted permission to occupy Building #B. The records do not indicate any other building has been approved. At this time only building #B may be occupied. PLANNING DEPARTMENT The Planning department is willing to grant temporary occupancy at this time, with conditions. PUBLIC WORKS DEPARTMENT During an inspection this morning (5/14/9 1), Public Works partially tested operation of the lift station on the site. The lift station is apparently operational, but the telemetry has not been installed. Since there is adequate storage capacity for one (1) unit in the event of system failure, temporary occupancy for one (1) unit can be granted at this time. ENGINEERING DEPARTMENT: After inspection this morning (5/14/9 1), the Engineering Department is now willing to grant a temporary occupancy, with conditions. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan CONDITIONS THAT WILL BE PLACED ON TEMPORARY OCCUPANCY 1. Install lift station telemetry by June 15, 199 1, as required by Engineering and Public Works.. 2. An application must be submitted to ADB by May 2 1 st for changes made in the following areas: a. Landscaping installed does not match the approved landscaping plan. b. Installation of unscreened mechanical equipment contrary to approved plans. c. Changes made to exterior lighting. Approved plans indicate nine (9) exterior light fixtures, but only five (5) were observed on site. d. Brick pavers shown on plans were not installed. 3. A permit is required for the fence adjacent to 3rd street that was not shown on the plans. This fence appears to be in the city right-of-way and will have to be moved or a street use permit will have to be obtained. 4. Problems have been identified with the approved parking plan and must be resolved before final occupancy can be granted: a. Four parking spaces were under sized and may not be counted if they do not meet Engineering standards. b. The second handicapped stall shown on the approved parking plan has not been provided. c. Two spaces were not properly striped. CONDITIONS FOR FINAL OCCUPANCY The following items are those that, to date, have been identified as corrections required before a FINAL OCCUPANCY will be granted. FIRE DEPARTMENT: All building on site must be inspected by the fire department and approved for occupancy before a final occupancy will be granted. Currently only building #B has been approved for temporary occupancy. PLANNING DEPARTMENT: The planning department has forwarded a list of corrections to be satisfied before a final occupancy will be issued. These corrections include: 1. ADB approval of all landscaping changes that have been made. 2. Approval and compliance with the required fence permit. 3. Insure the required parking has been provided. ENGINEERING DEPARTMENT: The Engineering Department has forwarded a correction list to the Building Official after their site inspection. They asked that no final occupancy be issued until the following items have been completed; 1. All drains and sewer manholes must be cleaned of all dirt and debris. Tlie on site sanity sewer lift station control panel is not accessible. Tlie existing enclosure is too narrow to allow for access to the "Power Disconnect Switch". 3. The lift station alarm system has not been tested. 4. Current configuration of check valves in the lift station does not allow for alternative by- pass. If one by-pass fails the system will fail. 5. Parking stalls at the side and rear of Building A and in front of Building B shall be in compliance with city parking standards. 6. Open plugged drain at the base of stairs to garages Building A. 7. Install locking nuts on all manhole covers. 8. Grout pipes, in valve vault, that run to lift station. 9. Grout all catch basins and manhole extension rings including grate at rockery near stream. 10. Clean out oil separator and all catch basins. 11. Connect downspout on south side of building B and southwest comer of building C to storm water tightline. 12. Secure chain link fencing to fence posts. 13. Provide a locking latch on lift station gate and widen east side of enclosure an additional 30 inches from its original position. 14. Provide required as built drawing of existing utility development. 15. Install lift station telemetry by June 15, 199 1. (will be noted as a condition of the Temporary Occupancy). 16. Repair asphalt paving on south side of building A. PUBLIC WORKS DEPARTMENT: The Public Works Department has forwarded a correction list to the Building Official after their site inspection. They asked that no final occupancy be issued until the following items have been completed; 1. Telemetry for the lift station must be installed, tested and fully operational- 2. The generator hook-up must be compatible with the city generator and the motors must be in the right polarity. I hope I have provided you with the information you need to make progress on your project. Please contact me if you have any questions. Sincerely, F-1 1(4571-la- X4A'-- R. Dick Mumma Certified Building Official cc: Mayor Naughton Peter Hahn, Community Services Director Robert Chave, Planning Manager City Clerk for distribution to City Council Members BJORN mown Mm MMM00%, 1 M ME N swo U " hbhNINC., REALTORS 322 MAIN STREET - EDMONDS. WASHINGTON 0-93020 . 775-1953 December 18, 1990 Mr. Gordy Hyde, Engineering Department City of Edmonds 250 - 5th Avenue North Edmonds, WA. 98020 Dear Gordy: We would appreciate if you would consider lowering the City Park.road adjoining our condominium development at 430 - 3rd Avenue South in Edmonds, the purpose being to facilitate the access of the Fire Department to our project. Also, would you please have the city trim the park maple trees where they overhang our project. We had a bid from our tree man of $300.00 with the City removing the debris. His name is Steve Gillis, at #742-2926. Sincerelv, BT: pn BibRN U "UIESENINC. H 322 MAIN STREET - EDMONDS Wl�HIINGTnl�� 93020 775-1953 June 22, 1988 IZTP�F`T FILE Ms. Lee Francis, Associate City Planner City of Edmonds 250 - 5th Avenue North Edmonds, WA 98020 RE: Architectural Design Board review of City Park Apartment Complex; 430-3rd Avenue South. Dear Ms. Francis: In answer to your memo to us I would like you to include the following conditions with our application previously submitted. We are attaching a copy of your memo for your reference. 1. D.O.E. approval of sewage pump station will be applied for and received prior to our submitti'ng building plans for the project. This per our consulting engineer, Lovell-Sauerland & Associates. 2. Temporary erosion plan will be submitted with application for building permit. 3. The wetlands boundary was determined by the environmental consulting firm of Shapiro & Associates. The report was submitted to Mary Lou Block and she responded by letter to us, the recommendation contained in which we are follow- ing to the letter. 4. Hydraulics permit should not have been obtained. We do not intend to trespass past west of the wetland boundary and intend no construction of sidewalks, etc. on wetlands property. 5. Emergency access is optional by the City. 6. We are going to eliminate the gate in our final plans. ... continued INMw N Ms. Lee Francis City of Edmonds Page Two 7. Our architect incorrectly used another city's requirements for back -out width. Our final plans will show the required 42 feet by simply moving our rockery and parking area the required distance north, along our north property line and by moving the sidewalk westward along the east side of Building B. 8. A slope profile will be submitted for Ci'ty approval with application for building permit, however, by spending a few minutes on the preliminary site grading plan submitted to you, you will see a gently sloping parking lot where, for example, the 120 ft. on the north side of Building B will slope from 31 ft. down to 28 f-t, a mere 2-2%. You can determine that easily by comparing the basement floor eleva- tion to the numbers in front of the garages and by the top inverts of the catch basins. 9. There will be no earth removed to other locations and/or brought into the site. The grading plan balances the quantities. 10. Building A has 4 double garages and I single total of 9. Building B has 3 double garages and 9 singles total of 15. Building C has 8 single garages - total of 8. In addition to the above, we have open parking spaces of 26. ... for a grand total of 58 11. Two handicap parking spaces will be located in the two northerly stalls by the cluster of four open spaces near the building entrance. Two more handicap parking spaces will be located in the westerly two spaces of the 5-space cluster in the northwest parking area. We have requested from our environmental consulting engineer a re- landscaping proposal pertaining to wetland species, said species to be planted in the 20 ft. buffer area where needed and will be included in our future landscape plan. S i n c e r ��sen, President sen, Inc. BT : pn enclosure cc : Mary Lou Block , Manager of Planning MI 64 W i7l a Cf jv, (C- a 4 CITr.OF EDMONDS COMMUNITY SERVICES� DEPARTMENT a11 4. 1 . . . . i6kT'OF-'W'AY CONSTRUCTION- PERMIT. Snohomish County PUD No. 1 A. * Owner:. Na.me P.O. Box 1107 B. * Contractor: Permit No. Issue Date le) 7 9e) Name Mailing Address Everett, WA 98206 Mailing Address 61ty State Zip City State Zip Lorren Patchatt 347-4353 Project Eng AWiTU=KeYNM= k., Telephone Number C. Address or Vicinity of Construction: 430 3rd Ave 5 "10 Type of Work to be Done: Qpen cut 3rd Ave S to 6W construct a 1ph se distribution tine to serve City Park Apte 1*?LV D. 0 Work in Connection With: El Sub or Plat El Single Family El City Projects 0 Commercial El MulAfAmily '0,ciul tLlity E. 0 Pavement Cut: ff] Y N F. * Size of Cut: 21 X 50' APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to,,this-an agrees to hold the City of Edmonds, t harmless from ahy'injuries.' damages, or claims of any kind -Of e/r, I 1P I P P "NY 07V r, If or n-orcyn Forseen, that may. V, ) 2. 1 n Z �71 to the defense be made against the City of Edmonds, or any of its departments or em(ployees, i cl ding o not Ifini Ne of any legal proceedings including defense costs, court costs�/and attorn' fe b ason of granting this permit. y 0 0 N THE CONTRACTOR IS RESPONSIBLE,FOR WORK4)ANSHIP AND MA,4ERIALS FOR A PERIOD OP ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is co I t by City forces, at which time a debit or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress'and at completion. • Restoration to be in accordance, with City Code. F I • Street to be kept clean at all times. STRE16-1 9 Traffic Control to be in accordance with City regulations. .I-* All 'street - cut ditches must be.patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Z", 94?F- 5&3 7 Signail� Date: 9-13-90 Owner or Cont ctor ,!nt This Permit Must be Posted at the Job ' Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: Ryv PERMIT FEE: 830 Z Time Authorized: Void after 60 —days. Restoration Fee: Special, Conditions: Wo c.)PEt-4 r—u-r. Receipt No.: 90#.0 (504"1 Ot4 NQF?MAt_ RaWEST. Fund I I I Fee: SHAL.L Au_oW ROA'D CUT IC414 TH15 i­11EjZMir, 7Hw(:tH Street, Cut Dimensions: PAN�'O 0" r-01-101-rION-1 ON 0 THCK CC)NS TZ%X,-n0tJ) RELEASED. BY: Date INS PECTED BY C) or4 SAO AVF_ ANO NO,\WOkKJ0 BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. March 1989 FIELD INSPECTION I I - Route copy to Street Ilrept.) Comments: 9 Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Mork Disapproved By, Date: FINAL APPROVAL BY: Date: Eniz. Div. JuIv 1985 0 0 CITY OF EDMONDS —0 5TH AVE W e EE)M(DtJL)'- WA 4,ciO.ij e (..Ii�,�) 77' Oirl COMMUNITY SERVICES: Public Works o Planning a Parks and Recreation e Engineering 8 90 - 199 -tml September 16, 1991 STREE I FILE Bjorn Thuesen Bjorn Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 LARRY S NAUGHTFN tif—nn PETER E. HAHN DIRECTOR A -;7 h,,,�" RE: Quit Claim Deed for Fence at City Park Apartments 428-432 3rd Avenue South Dear Bjorn: We received the subject quit claim deed but unfortunately the land you are deeding to the City already belongs to the City. What we need is the fence deeded to the City with a clause stating that repair, maintenance, and liability of the fence will be the responsibility of the owner/owners of City Park Apartments. If this is not satisfactory to you, then the fence will have to be moved to your property line. If you have any questions, please call me. Sincerely, Lyle Chrisman Engineering Inspector LC/dm Enclosure Quit Claim Deed cc: Dick Mumma, Building Official Street File Thuesen B:\Word 9 � c,--, Alberts t * Incorporated August U 1890 a Sister Cities International — Hekinan, Japan UIT CLAIM DEED THE GRANTOR, BJORN THUESEN, INNC. , for a nd i n cc;ns -_1 der at i or, of mutual benefits to be derived, convey and quit claim to -Lhe City of Edmonds, a municipal corporation, the 'Ifollowing described real estate, situated in the County of Snohomish, State of Washington, including any interest therein which grantor may hereafter acquire: The westerly 2 feet of that portion of 3rd Avenue South in Edmonds laying easterly of the south 48 feet of the easterly 400 feet of the north half of the northwest quarter of the northeast quarter of the northeast quarter of Section 26, Township 27 North, Range 3 East W.M.; EXCEPT the north 190 feet; and,.EXCEPT roads. together with the right to make all -necessary cut or fill slopes on the land of grantor's adjacent to the above -described real property in connection with the construction, maintenance or improvement of the above -described real property for purposes of a public roadway. DATED this day of V let 1100 0 Q) A CK'NOWLEDGIM ENT IN A REPRESSENTATIVE C.-A, P A C-1 Q oTAR cf, v: a BM Snohom-ish V/ S�\ Biorn Thuesen ;,fare the indMduai(s) whe 'n'; az'� szz-&6 that to it as mc -Thuesen. Inc. Bjorn , -, - - -- -- P -, - - : , r-[ %- f(D , r , , , — - :­ Je instru-mept- :-e iree am� _c 0� _� ­­ -- . . . -h- ___S 2.,Id m.,� . _. I 4_� C ",n-- TY Foo S- I E — 1 —1 S c . C70N; M" appointment exp;re� 7121 Aq,.,z BibRN THUESENIM... REALTORS 322 V.AIN STREET - EDMONDS. WASHINGTON 98020 775-1953 STREET FILE September 11, 1991 Mr. Lyle Chrisman Engineering Department 0 City of Edmonds 250 - 5th Ave. No. Edmonds, WA 98020 Dear Mr. Chrisman: Enclosed please find Quit Claim Deed to the fence on City property at approximately 428 - 3rd Avenue South. We are correcting the parking situation so that we should be able to obtain approval by next week. S i n c e r e 1 y , BJORN THUESEN, INC. Bjorn Thuesen, President B T / j s cc: Richard Mumma/ BUILDING SEP 12 1991 9 8 C5 C3 9 0 19 CITY OF EDMONDS 250 E-TH AVE N - E DMONOS WA �c�,L?210 - 1 71 COMMUNITY SERVICES: Public Works o Planning o Parks and Recreation 9 Engineering I September 16, 1991 Bjorn Thuesen Bjorn Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 LARR,' S NAIJGHT[-t1 SEP 18 799, RE: Quit Claim Deed for Fence at City Park Apartments 428-432 3rd Avenue South Dear Bjorn: PETER E. HAHN DIRECTOR We received the subject quit claim deed but unfortunately the land you are deeding to the City already belongs to the City. What we need is the fence deeded to the City with a clause stating that repair, maintenance, and liability of the fence will be the responsibility of the owner/owners of City Park Apartments. If this is not satisfactory to you, then the fence will have to be moved to your property line. If you have any questions, please call me. Sincerely, L lee Chrisman Engineering Inspector LC/dm Enclosure Quit Claim Deed cc: Dick Mumma, Building Official 1'1� Street File Thuesen B:\Word o Incorporated August 11, 1890 a Sister Cities International — Hekinan, Japan 6 QUIT CLAIM DEED THE GRANTOR, BJORN THUESEN, INC. , for and in �-o,is-!deratior, of mutual benefits to be derived, convey and quit claim to -Uhe City of Edmonds, a municipal corporation, the following described real estate, situated in the County of Snohomish, State of Washington, including any interest therein which grantor may hereafter acquire: The westerly 2 feet of that portion of 3rd Avenue South in Edmonds laying easterly of the south 48 feet of the easterly 400 feet of the north half of the northwest quarter of the northeast quarter of the northeast quarter of Section 26, Township 27 North, Range 3 East W.M.; EXCEPT the north 190 feet; and, EXCEPT roads. together with the right to make allonecessary cut or fill slopes on the land of grantor's adjacent to the above -described real property in connection with the construction, maintenance or improvement of the above -described real property for purposes of a public roadway. DATED this day of 19 ,ow C7� it I �Pe ACKL_'NOWLEDGIMENT IN A REP E S E 3N Tr�k T E C A P A kAOTAR,�% I C==:> 0 Pt/ B L I ,0, Snohomish Iloilo WV A S " O.C$z' S--- evjr:�-C, r'lat the indiv;dual(s) who -jwer, -e th,� umer -, �'g e szzzled that va- to cxecLn z an�. ack-no vic- d iz zs the Presid nt B orn Thuesen, Inc. �� .— :�-e �ree an(� P.cT of for �he uses and purposes rnendonQd i.-i [he instru-ment- E N 0 A R Y P U !!—"C FOR —.. E Mv appointrner:t expires --"r-FiVED SEP 1 3 1991 ENGINEERING --wl uj 5- LL. LLJ I CC - -7- L! 22 -,T/-/-/ CO7' Z71�7/-111-:-�--Ll ll!:�/, A-- -�2 67. lz, 36 Z- ISTE N A L �4 z O�L- We 72EF 12 'a 36 ISTE OM41 �� �5f V- " //,- Z- � 0 a NOTICE TO PERMITTEE AND/ OR OWNER El PARTIAL APPROVAL El VIOLATION CORRECTIONS REQUIRED PERMIT NUMBER J011,11DO, 4$ NO PERMIT - STOP WORK - REMOVE CONSTRUCTION OR OBTAIN PERMIT AND MAKE WORK COMPLY WITH BUILDING LAWS. CONSrRUCTION IS NOT IN ACCORDANCE WITH APPROVED PLANS AND PERMIT - STOP WORK- MAKE EXISTING WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE IT. 0 STOP WORK - UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR. vrA CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN Ai BE APPROVED. F] WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED. CONTACT INSPECTOR AND RECALL FOR INSPECTION. ARRANGE FOR APPOINTMENT. Z1A7-,5j--,f77,0A),' A; � � �,V/,5 �,,- 1 -1, 6e OAW444 a4dw AA� IAISM40 /04�� _a4XS d4;�aa—j A/ AA.4 4 ,J 7-31 A!2W /4,/AWX 152a" THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR PENALTIES IMPOSED BY LAW MAY BE APPLIED. FOR INSPECTIONS CALL: 771-3202. BUILDING DIV. PUBLIC WORKS ZINSPELOR�� CITY OF DATE FIRE DqT. EDMONDS O&Wt$Ce4 BJORN THUE"SENINC., REALTORS 322 MAIN STREET - EDMONDS. WASHINGTON 98020 . 775-1953 I S T R T F I E May 13, 1991 Abel Curbing, Inc. P.O. Box 1862 Everett, WA 98206 Gentlemen: F'P "� q At our City Park Condominium project, 430 - 3rd Ave. So., Edmonds, number 4 parking stall near the gazebo measures only 8 feet in width. Some of the stalls measure 9 feet. Please make the appropriate change to meet city standards. Also, parking stall #9 has the number reversed so it looks like a number 6. Please let us know when this has been corrected. S i n c e r e 1 y , BT/js NC . BjbRN U 0 V'nL'U[�O[EH INC., REALTORS 322 MAIN STREET - EDMONDS, WASHINGTON 98020 - 775-1953 S T R E"EiE --- T F I L E City of Edmonds Engineering Department 250 - 5th Avenue North Edmonds, WA 98020 May 13, 1991 Re: City Park Condominiums 430 - 434 3rd Avenue So. Edmonds, WA Gentlemen: 5/1T M 0'ec Iven IVIA Y c 0 199, ENOVE%G We have been asking for a Temporary Occupancy Permit and would appreciate it if you would submit Ito us your check list of things that have been approved and things that still have to be attended t o . Please call the undersigned so that we may pick up your check list at the counter as soon as possible. S i n c e r e I y , /-Thuesen, dent BT/js N C . A 090 li ~d4t4k 2��-Ae &w�w C-- NoVil 77 ^AD -4:: r— In 02? Ifte,4_40 -1-5 OjOj*OA-Ig9 /7 04W IA)37hU XOOAkA,4� VZJ7Y aA) A-11,pvhw4wv IAI� 0 -9 AL ire CIPO-01 "A457,lr TCAIW-- 7, 5 xe ey-re Awe - AA,19 I 4-It- A: 7 -- A. 3-1 ��FV- 41 -IA' Ar A—t, �-uff-�LtW- /257 ad 0- 70 AW 7i Q t, P-/ W- P--&& -61 � -P7 W--, �W_ Ax- F-0 ol 77 lz425� 7--K /�W A�77- 51;�.5 �A) Vrz�, 192,—D� gly �5 171W1Z,-1Ar, '57VU-- #A 0 W JA) o;p- www A" ou IS O�r- -57;q7P-S 7-,, 4470-� C- X #A Ul fA coo zIT7'-' 7?-/ 4-2WEW-5 C4 4 C; C; C4 C4 6Ar2u r A -Pe) i//u 0 Iz- A"Zil"D VAU 6�r Ille7 z7 -57 ZL5 '16"(y 5--Iza 4�AJ6Z:�;� 0 774A)7-IlAg- -F- 44,^a=7450 -Tw M 49 7Z9 !:9k 7- Af rtH. 61�1 /WR M F"4? A)OT" 1A) 67-) 93(1� c STN"EET FILE TO: Dick Mumma FROM: Ron Holland SU&=: CITY PARK APARMAENTS R - -.-� - , i �—Ji t '" J A P R PIERMIT COUNTER 1. Telemetry from Stead & Baggerly must be hooked up per City of Edmonds requirements.' Must be hooked to 110 control breaker so if turned off, alirm will sound at shops. 2. Generator must be hooked up correctly to accept City portable generator and motors are to be in right polarity. 3. Valve vault must be hooked up with proper drain to wet well and provided with a check valve that is accessible so maintenance can be performed in wet well. 4. Fence is to be constructed around electrical panels (61 in height with full gate opening on south side t� allow access for maintenance). Must have 3' working space on sides and back from furthest extremity of electrical boxes. 5. Manhole lid on valve vault must be reset and mudded so as to allow no leakage around base and must be aligned with opening. 0 CASCADE GEOTECHNICAL, INC. 12911 N.E. 126TH PLACE (206) 821-5080 KIRKLAND, Mt� 980-34,r, FA,,Af)_R23-2203 �INCTON TO: 3 zz :s;— ATTN:- THE FOLLOWING WAS NOTED: rn zlzr PREVIOUS REPORT N C) 0 D A T E_j I?Iql I JOB NO. PRCJEi� LOCATION 'e7� BLDG. PERMIT NO. OWNER WEATHER _R�_S_cElvm:n TEMP. AT AM Pm ENGINEER APR 3 0 1921 ARCHITECT ENGINEERING CONTRACTOR I of!!__� �0' 44 .1.6 /37-,3 1co L_ ud /Z:z / �_5 0 Ji f rPnTPCHNI(-Al R C 0 P I E S T 0. 64, G,e 0011 0 'FA - Fa- STREET FILE MEMO TO: Dick Mumma Building Official FROM: Gary L. McComas Fire Marshal M January 17, 1991 SUBJECT: SECONDARY ACCESS FOR 29 UNIT APARTMENT AT T3-0--3-R-D---A-V--E—NUE SOUTH The requirement. to provide a secondary access "from Edmonds City Park is removed. As final grade was established in the complex it, was obvious that the grade transition would be very difficult and several solutions were investigated. It is now apparent. that. there is no practical solution. I "IX GLM: be PROJ,ECT mi. wr:5 .............. PROJ. # ........................... CONTRACTOR ............................................ DATE ................ WORKERS ON SITE ............................................................... ........................... "E" STRc i EQUIPMENT ON SITE ....................................................................... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . WEATHER .................. TEMPERATURE .4�:9 .................................. 'DAIL'Y ACTIVITY (A.M./P.M.) ......................................... 'I"OL'o pa'aj hjmr_7�*7_) T-O kfA_9 4�4-F-6-44 ric>r- . . . . . . . . . . . .. . . . . . . . . . . . ... . . . . . . . . . . . . . . .. . . ... . . . . . . . . . . . . . . . . . . . . . ... 0;jvgy/.r'y'T- fZ4P wz�� 6 y ............................ .................... . . . . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..... ; .......................................... FOLLOW-UP TESTING ........................................................................ ........................................................ .................... CITY REPRESENTATIVE ... .................... DATE/TIME .... ........... PROJLOG/TXTFORMS 0 0 PROJ I E.CT A�VIVAW-eA� ............. PROJ. # ..................................... CONTRACTOR ............................. o .............. DATE. I.q ................ WOR�ERS ON SITE ......................................................................... EQUIPMENT ON SITE ............................. 6 ............................................ ........................................................................................ WEATHER .................. TEMPERATURE i4n6i�Z ................................ DAILY ACTIVITY (A.M./P.M.) Zl��—..Alj . .............................................. 4J ...................... 17- ................................................................ AeO64e A-'V_7- .................... .. ................................... .. ................................................. . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . 0 . . . . ... . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ........................................ FOLLOW—UP TESTING ....................................................................... ................... ....................................... ........................ CITY REPRESENTATIVE ............ DATE/TIME./-.fo ........... PROJLOG/TXTFORMS, 0 0 PROJECT .............. PROJ. # ...................................... CONTRACTOR ............. ............... ............. DATE..)��A��.79 ................ WORKERS' ON SITE ......................................................................... E,QUIPMENT ON SITE ......................................................................... WEATHER ................. TEMPERATURE .................................... DAILY ACTIVITY (A.M./P.M.) ...................................................... . . ................... XA .............. .. . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00,:z te 0 -57q,,;&, zo, ez�ee . -�� 4"o zp, :4,0�-n . ....... ..................................................... .................... ...................................................................... ........................... o ................ o ................. o ......................... ................................................................................ ........................................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ I FOLLOW-UP TESTING ............................................................. ............ i * .................... . ... ....................................................... DATE/TIM CITY REPRESENTATIVE .................... EA4.XW ............. PRojLbG/TXTFORMS 0 0 PROJECT ............... PROJ. # ..................................... CONTRACTOR T*kj-E�s . ................................ DATE. K� t+?V. -TR ................... WORKERS ON SITE ......................................................................... EQUIPMENT ON SITE ........................................................................ WEATHER CLQJ9�r ................... TEMPERATURE 5P ...................................... DA I L Y ACT I V I TY (A. M. P. M. 1-3,0 - 14, 0 ....................................................... FIt, .......... ............... ............................. Ir.......... .............. ....... ....... ........................................ ................ ....................................... ....... t� .................... . . .................. .............. ow -L�14 .............. ................................ ..................... ................... .............. .............................. _Q ......................................................... ............................... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......................................................... I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................... o .................................................... ao .................................. COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ........................... .................... FOLLOW-UP TESTING .......................................................................... . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C I TY REPR ES ENTAT I V E ........... DATE/ T I ME. PROJLOG/TXTFORMS PROJECT .4�aj'. ............. PROJ. # ..................................... CONTRACTOR ........................ .................. DATE.14. �O� .................. WORkERSON SITE .......................................................................... I EQUIPMENTON SITE ................................................. o ........ 0 ........... 1; . .............. o ................................ 0 ........ .................. o., ............. WEATHER ............. TEMPERATURE 45- .............. o ........ o ......... DAILY ACTI'VITY (AX/P.M.) .................................. 0 0 . 0 ......... TYpqc— :r 4�'10 .................. o ..... o .... o ................................... PW- �'.Z.MgLvopq .............. s ........ 0 Z15 lob' or- bAo s: DeA�t bd ........................................................................................... p, we_ . 0 t'6 *4.7-4 t5-1 -k s 6e l'Ag6lLaL 4two-c-peec-c-i o ........................ 0 ........ o ............................................ ..... o..o ............................................................................... ....... I ................................................................................ .............. 4 ............................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................... .......... .............. o ..... 0 ........... 0 ..................................................... ........................................................ o .......................... 0 .... ........................................................................................ ........................................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FOLLOW—UP TESTING .................................................... ...... ........................ 'CITY1'REP RESENTATIVE ........... DATE/TIME. ........... PROJLOG/TX'TFORMS PROJECT -PA'cK .............. ........ PROJ. # ..................................... ................. CONTRACTOR f7PW.%� .............................. DATE;�� P4? WORKERSON SITE ......................................................................... EQUIPMENT ON SITE ........................................................................ ......................................................................................... ..................................... WEATHER ............ ...... TEMPERATURE -45 16 DAILY A CTIVITY (A.M./P.M.) 0 ................................................ .................................. ....... I ................................................................................. COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................. ........................................................................................ FOLLbw-uP TESTING ................................................................... ....................... I ............................................................ MY'REPRESENTATIVE eie-. 1AA4 ... ................... DATE/TIME. ................... PROJLOG/TXTFORMS PROJECT. ', . M> .............. .................. PROJ. # ........... .......... ­CONfRACTOR ............................................. DATE.] .................... WORKERS ON SITEi�,..ii ...................................... .................................. .................................................................................. EQUI,PMENT-ON SITE ......................... ..................................................... o .......... WEATHER ...................... TEMPERATURE .......... 00 ... 0­ ........... DAIL'Y ACTIVITY (AX/P.M.) .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....... o ... o—o' o ........................ o...,.. - 4.*.& F�- �.tftn !Y. AtT�� . �1.0 Wo- mp�. 6o 90.<7r fP. Vo F_o� ............ .......... T.. o V.ON.Df. :T014WA P.A�wo. 2.. ok.. 4:V �. AAS.. Ao. 0 0 0 ........ . . ...... 7. .. . .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . .. ......................................................................................... ................ ........................................................... ...... I ........ .................. ................... ................................... ................ . . . . . . . . . . . . . o . . . . . o . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . ... . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..................... �o ................... o ....... ....................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . ........... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . ...... o . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . FOLLOW—UP TESTING .......... .......................................................... ........................ .......................................... . A) ...... DATE/TIME ...... CITY�!REPRESE'NTATIVE PROJLOG/TXTFORMS' PROJECT................. PROJ. # ...................................... CONTRACTOR —T. ........................................ D A T E . .................. WORKERS ON SITE ................................... : ...................................... EqUIPMENT ON SITE...-� .................... I .................................................. ........................................................................................ WEATHER .................... TEMPERATURE '9'66 ................................... 445 DAILY ACTIVITY (A.M./P.M.) .......................................................... Dw ................... ...................... ........................................................................................ NIL) 042-6vIdO ........................................................................................ 0IF-C-017—D. . AT.—. . m� ...................................................................... ............................................................................. ........................................................................................ . . . . . I . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..................................................... ... . . . . . . . .. . ... . ... . . o . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................ o . . . 0 . . . . . . . . . . . . . . . . 0 0 . . . . . . o ........ 0 .............................. FOLLOW—UP TESTING... ........ o ............... o.00 ...................................... 0. 4 . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... ... . . . . . . . CITY REPRESENTATIVE* ........................ DATE/TIME...o ....... o ...... o .... PROJLOG/TXTFORM,S 9 0 PROJECT ............... PROJ. # ..................................... CONTRACTOR .771�1(�.l ................................. DATE. .................. WORKERS ON SITE ......................................................................... EQUIPMENT ON SITE ........................................................................ ......................................................................................... WEATHER .................. TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) PIA� ................................................ W146 pr�_A. 1�42,4�1 ................................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS)l ................................................ ........................................................................................ . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FOLLOW—UP TESTING..... .................................... o ........................ ..................................................................................... CITY REPRESENTATIVE .................................. DATE/TIME ........................ PROJLOG/TXTFORMS- 0 0 -r-f PAYL(c PT-s PROJECT: ................................... PROJ. # ...................................... .CONTRACTOR .................................... DATE.). ....................... WORKERSON SITE ..... i ................... ; ................................................ EQUIPMENTON SITE ....................................................................... .......................................................................................... WEATHER ........................... TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) .............................................. WA--S -row .......................... .......................................................... r_��o_v --rD 6 F_jLLFD L ....................................................... ........... (2 N. .............................................. M4 .... C0TJ(-r4&70y- V 5LqVF_ DIW 1-P V /cu. U-17 C, lemz .......................................... .. .................................... ....................................... .............................................. ................................... ............................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - -------------- .................... ................. ........................................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ ......................................................................................... FOLLOW-UP TESTING ....................... 1 ................................................ ................................... .......... CITY REPRESENTATIVE .... ............ DATE/TIME ....... ............... PROJLOG/TXTFORMS P ROJ E C T . '��l T_ f ............. PROJ. # ..................................... CONTRACTOR ............................... DATE .............................. WORKERS ON SITE .......................................................................... ........................................................................................ EQUIPMENT ON SITE .............. .......................................................... WEATHER ..................... ..... TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) ......................................................... .......................................................................... V Tjj--�' PO f A-CTW ....................................................................................... .................................. ........................................ ................................................................................. COMMENTS (CONVERSATIONS, FIELD PROBLEMS) .......................................... FOLLOW-UP TESTING ....................................................................... . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . ................................. CITY REPRESENTATIVE .................... DATE/TIME ...... .............. PROJLOG/TXTFORMS 0 0 P R 0 J E C T ............ PROJ. # ..................................... CONTRACTOR .............................. DATE.Z-6­5-w.-'4� ................. WORKERS ON SITE .................................................................... EQUIPMENT ON SITE ....................................................................... ........................................................................................ WEATHER..��'��Vj .................. TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) ................................................ ............................. ........... .. ...... .. .............................. ................. ........... ............... Lj -PA .......... Tv..n�p..ft.lw. oqqv�_ .................................... . . ....... 0 1 -/AT0--5 ................. ...................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ FOLLOW-UP TESTING ....................................................................... ....................... ...................................................... z6se' W). CITY REPRESENTATIVE ... ..................... DATE/TIME ........ f ............... PRO.JLOG/TXTFORMS P ROJECT ......... ..... PROJ. # ..................................... ................................. DATE. .0 ................. CONTRACTOR WORKERSON SITE .................................................... ...................... ........................................................................................ EQUIPMENT ON SITE ....................................................................... ........................................................................................ WEAT'HER' .................... TEMPERATURE .55.-64 ................................. . DAILY ACTIVITY (A.M./P.M.) f��p ........................................................ . ................. F-1 PJAr. 7P�. ................................... co)-(PAM4 �Jcqc-4FA GX A- T U-) T f rE, W Fo (Z ..................... .. .... .................... dD65 Zr-C' A(5 OaC 0 -, W7- TD 4?7,f Ph5 6 6Wr9tTr-0 V�AT614,ke_ ..................................... ..................... Flbl_� F-A6-izt& pelaC-51_ r—l'f, 5) TOAMoO T(D �g_f ..7D. P .......................... ....... ................ ouT t)r— Ast::4--o �ZWG-ST— .......................... o ............................................................... 1OHr-Al 147-- )91*-rl,) �J 7V 11,6M)PA(f. 'e NL ro. :�kt ....................................... pt ........................................................................... ............. br I i7lo f�"'ko I PiTo 4 Aw. L"'Ayw (Awe(L Sc)A'<g_lq _�a�' .......................... ...... ................................ SL�tL_tvO PUU�0.7b 6.f�r2_ lancl-tc— .... p ..................... ..... o ............................................. ;.o ....... ........................................................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ FOLLOW-UP TESTING ............................................. ......................... .... ........... CITY,REPRESENTATI-VE .................................... DATE/TIME ........................ PROJLOG/TXTFORMS7 P R 0 J E C T ............. PROJ. # ...................................... T7-kieso-4d 2_0 sjsj,,.�� C/ 4) CONTRACTOR ....... ; .................................... DATE .............................. WORKERS ON SITE ..................................................... EQUIPMENT ON SITE .......................................................................... WEATHER ........................... TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M. 4-oz)— (&�5o s-rx�Ttoo) ............................... .............. I ............... ..... w 5PF-PAZ�r-- �J&Tk-_-a ScLiO-r� (2 ............................................................ .......... wo -. � 1�r.. - f .-ro i- o 44 f �-i .,D! ttr �4.65-� PLlUt-__D ............................. ......................... rD -C (fe!� tj� clv��-K j le- p 4 KK ............ .. . ......... .................. .................................. .................. Tz.) ... v"-xe-� ......................................................................................... . . ... . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS,'FIELD PROBLEMS) ................................................ ........................................................................................ ........................................................................................ FOLLOW-UP TESTING .................................................................... ...................... ... ......................................................... CITY REPRESENTATIVE DATE/TIME ......................... PROJLOG/TXTFORMS N 0 QV- /0, �/, Of CITY OF EDIVIOP40S 250 51h AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES STN"EET FILE March 25, 1986 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR Mr. Jerald C. Hall 4437 Lake Washington Blvd., #102 Kirkland, WA 98033 Dear Mr. Hall: SUBJECT: 430-3RD AVE. S. - ACCT. #102-11100 I received your letter dated March 18, 1986 requesting 'the balance of our water bill be waived. I must inform you that I cannot allow y this at this time. The water must be paid for if it goes through the meter unless there are unusual circumstances, such as thp City or a contractor hired by the City breaking your pipes. If you have any further questions, please feel free to give me a call at 771-3202, extension 296. Sincerely, BOBBY R. MILLS Superintendent of Public Works BRM/ml cc: Utility Billing BRENA DT MARCH DT PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING ,�f H 4437 Lake Washington Blvd., #102 Kirkland, WA 98033 March 18, 1986 Edmonds Water Dept. Edmonds, WA 98020 Gentlemen: Enclosed is my check in the amount of $100 to apply to account 102-11100. 1 am the owner of the house, but it is rented. Apparently around Christmas time a little - used downstairs toilet was left running. The problem was not detected and corrected until you notified the tenants in February of an appa"rent leak, which you assumed to exist because of the unusually high meter reading. I ask that you waive the balance of the bill due to the unusual- circumstances. I would point out also that the toilet which had been left running empties into a septic tank, not into the sewer.. so no additional bur- den was placed on sewage treatment facilities. Thank you for your consideration. Very truly yours, J I ZC�. �Ha 1�1 jch/nah Y�ECEIYEQ PUBLIC %ORKS CITY OF EDMONDS-UTILITY BILLING CCO T ACCOUNT NUMBER � 100-09350 102-'1 loo S S IC ERVICEACDRESS � 430 3RI) AV S MA G P JAD mN A I D Q_ C V MLR E I E *'c NS L Af^- GS TELEPHONE METERSIZEO 3/4 NO. OF UNITS SEWER CHARGE 14.91 WATER BASE > CONNECTED YES SUPPLIER > s CODING� A W U RAE DTOS 1 A METER NO. � 2994 _F LOCATION 'Ale . Df, DATE READ - CONS. NOTE DATE READ CONS. NOTE 7� ILE u 13. IIINn i 57, 2,� IF �A �Di J) - __ -2b 0401 358 m 0: -CITY OF EDMONDS Permit No. COMMUNITY SERVICES DEPARTMENT Issue Date .920 -WAY CONSTRUCTION PER -T FILE RIGHT -OF MIT A. e Owner: �2 0 Y ;It/ V. 4_1 �7_ _)1 e Contractor: 6, 1-C-2 YL) NO -NAme MpLiling, Addre Nailm. ddre5s CA,) P/ City Stite" Zip City State Zi'P' State License Number "relephone'Number C. 9 Address or Vicinity of Construction: 711 C) Type of Work *to be Done: L D. 9 Work in Connection With: 0 Sub or Plat V e El Single Family El Commercial Multifamily E. 0 Pavement Cut: P Y 0 N F. 0 Size of Cut: X Z APPLICANT TO READ AND SIGN I]:, City Projects 11' Utility. INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs,* court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit'or credit will be processed for.isstiance to the applicant. 9 A 24 hour n I otice is required for inspection; Please call Engineering: 771-3202 Work is to be inspected during progress and at completion. • Restoration to be in accordance with City Code. • Street to be kept clean at all times. e Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Date: Signature 0,0�nr or �8­ntractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL-A-61G Prior to Beginning Work APPROVED BY: Sn2_4 PERMIT FEE: Z Time Authorized: Void after- —days. Restoration Fee: 0 Special Conditions: ZM46!Nwd e-1--441 Receipt No Z 2 9 41_5 Fund I H Fee: Street Cut Dimensions: Z. x AQ $ U RELEASED BY: Date INSPECTED BY Date C4 0 NO WORK TO BEGIN PRIOR TO PERMIT -ISSUANCE Eng. Div. Maich 1989 FIELD INSPECTION NOTT (FuTI I I - Route copy to Street Dep J. Comments: 9- 17 - 9 0 Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.:, Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. July 1985 CITY OF EDMONDS' D'-N E W El ADDITION RETIREMENT ASSET INFORMATION SHEET STREET FILE ASSET NO. �ADDITION TO'ASSET NO. c(f3o 17(D. DESCRIPTION \m OA� Sur SERIAL NO. LOCATION DEPT. NO. C) croj PURCHASE ORDER NO. PURCHASE ORDER DATE COST, PROJECT NUMBER PROJECT COMPLETION DATE COST o, B.A.R.S. ACCOUNT.No. XV E STI MATED LIFE INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST 'SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY A /EPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L. ENTRY REFERENCE VERIFIED BY PROCESSED BATCH NO. DATE INITIAL tnp DEPARTMEKT FILE CITY OF EDMONDS. D/NEW. ADDITION E] RETIREMENT ASSET INFORMATION SHEET ASSET NO. ADDITION TO ASSET NO. - -36 c 53 (M)(000- 01 /0 DESCRIPTION -c SERIAL NO. LOCATION L�3 DEPT. NO. - I li sc(_k+k PURCHASE ORDER NO. PROJECT NUMBER PURCHASE ORDER DATE PROJECT COMPLETION DATE Q COST COST L1, o B.A.R-.S. ACCOUNT NO. 00, c o ESTIMATED LIFE ICS INITIATED BY DATE APPROVED BY **SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT'REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY M/DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L.'ENTRY "REFERENCE. DATE Mp) INIT IAL DEPARTMENT FILE VERIFIED BY PROCESSED BATCH NO.- PURCHASE ORDER NO. PROJECT NUMBER s 0197- PURCHASE -ORD E R DATE PROJECT COMPLETION DATE COST �COST B.A.R.S. ACCOUNT NO. .000, 0 1 -S L ESTIMATED LIFE INITIATED BY DATE APPROVED BY �'*SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REOUEST *SUBMIT ASSET. INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY CITY OF EDMONDS LAURA M. HALL 250 - 5TH AVE. N. EDMONDS, WA 98020 (206) 771-0220 FAX (206) 771-0221 MAYOR COMMUNITY SERVICES DEPARTMENT PETER E. HAHN Public Works a Planning o Parks and Recreation o Engineering DIRECTOR 9 0 - 1 9 q '�) June 15, 1992 Bjorn Thuesen 432 Third Avenue South Edmonds, I WA 98020 STREET FILE Dear Resident: On June 12, 1992 you were notified of a possible water leak in the water system. Our most recent reading of your water meter indicates unusually high consumption and/or a current water leak in the system. Please check for leaking faucets, toilets, pipes etc., as no billing credit is allowed on these items. If you have any questions regarding this matter, please call Utility Billing after you receive your billing statement at 771-0241 or Water Maintenance, 771-0235, extension 349 or 347. Sincerely, Q., qxx Ron Holland Water/Sewer Supervisor RH/l k FOLLOWUP/TXTWATER 0 Incorporated August 11, 1890 0 ;t7 Z.',, CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWN't R NAME/NAME OF BUSINESS BJORN THUESEN, INC. a: uj z 3' MAILING ADDRESS "'TRCCT 1: h2 Main St. 11- E 0 t - , ', CITY TELEPHONE NUMBER Edmonds 775-1953 NAME D. A. Hermand Co. LU ADDRESS 11'416.Slater Ave. N.E. L)I tiCITY --TT—Fi 171— 4nmF miunro u0c . MIT ZONE PUMBEA SOCA107 RM 2. L/ B ADDRESS rd Avenue Sonth LEGAL DESCRIPTI CHECK SUBDIVISI NO. LID NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP APPROVED BY REQUIRED DEDICATION EXISTING A) PROPOSED iVV 0 K Cr RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED W STREET USE PERMIT REQUIPIED'�- Uj z SEE ENGINEERING MEMO DATED RE�VIEV�,BY z ') W REMARKSa '07 � /It] V METER 7,1ZE BUILDING SUPPV, SIZE FIXTURE UNITS Y2, cr W REMLkRK r J'4�. SIGN AREA ALLOWED PROPOSED ENV. REVIEW COMPLETE EXEMPT �Z�11 No SHORELINE# VARIANCE OR CU PLANNING REVIEW BY DATE SETBACKS — FEET 'HEIGHT, LOT COVERAGE '4 r z z FRONT SIDE REAR z HFMARKS 0. A?:3 S-) 0 ob CHECKED BY TYPE OF CONSTRUCTION CODE HEIGHT f 7x�. SPECIAL INSPECTOR REQUIRED AREA OCCUPANCY GROUPg/ OCCUPANT LOAD 0 YES C NO -REMARKS PROGRESS INSPECTIONS PER LIBC 305 z A�t I?F6 I* iF4*6 I/ ea-15 .j ca /Z h/ � so .PLAN CHECK FEE —9 S 0 BUILDING 102f PLUMBING �5 -ir ME I CHANICAL mt 2.r j2/ 41 Angmir GRADINGIFILL STATE SURCHARGE ENERGY CODE PLAN CHECK DEPOSIT TOTAL AMOUNT DUE ` (0 ae F3 -V- ATTENTION APPLICATION APPROVAL THIS PERMIT AUTHORIZES This application is not a permit until ONLY THE signed by the Building Official or his WORK NOTED Deputy; and fees are pajd, and receipt is I NSPECTION acknc)W�ldgeclinspac' rovided. r DEPARTMENT CITY OF NATURE TE,,- EDMONDS Af ::,) E rIE Y: 'f--bATE 771-3202 11 ON /Y L IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE 11 %? r f� 15 �� UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor 102-87 I T5—ff'or,-87NF6Ni7cDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS BJORN THUESEN, INC. Cr UJ MAILING ADDRESS Z 3: 322 Main St. .0 CITY TELEPHONE NUMBER Edmonds 775-1953 NAME D. A. HERMANS CO. LU ADDRESS 11416 Slater Ave. N.E. CITY TELEPHONE NUMBER A Kirkland 827-2763/775-1953 NAME BJORN THUESEN, INC. ADDRESS 0 L) 322 Main St. 2 CITY TELEPHONE NUMBER 4o N Edmonds 775-1953 STATE LICENSE NUMBER BJORN1*225BZ Legal Description of Property - include all easements (show below or attach two copies) :jZ f i easterly 400 ft. o -iorth half of the northwest �9: quarter of the northeast quarter of the northeast auarter of Section 26, Township 27 North. Rmim 3 o East, W.M.; TiY= the north 190 feet; and, gff,= roads. _TR X A C C-T -t� 262703-1-010-0002 rx Fx_1 NEW RESIDENTIAL PLUMBING ADDIALTER 1:1 COMMERCIAL MECHANICAL REPAIR APT. BLDG. SIGN EXCAVATE FENCE El DEMOLISH F OR FILL I x FT) CARPORT swim REMODEL EIGARAGE POOL WOOD STOVE I F7 RETAINING WALL/ INSERT RENEWAL ROCKERY -C I -Jim ( wl-A:� ;0 NUMBER OF STORIES NUMBER OF i CO 2 0 DWELLIN� UNITS Bldg. C) 7 I MURE OF WORK TO BE DONE (ATTACH PLOT PLAN) Multiple RM 2406 a-1) 1/7 -A 07 -� &ST41c njAt CCtWAlf �07_7013 7 This PeTmit covers work to be done on private property ONLY. Any con�4rucjiqgl . _cjn the publ[Q domain (curbs, sidewalks, dri, wgg-s,-'M'ii��60es,-etc.f.v)iIPYequir''-ep�rate brmission. Permit Application: 180 Days Permit Limit: 1 Year - Provided WorK is Started Within 180 Days 'a'Applicant, on behalf of his or her spouse, heirs, assigns and n successors in interest, agrees to indemnity, defend and hold harmless the City of Edmonds, Washington, its officials, 2 employees, and agents from any and all claims for damages of < whatever nature, arising directly orindirectly from the issuance of this permit. Issuance of. this permit shall not be deemed to 0 modify, walveror reduce any requirement of any city ordinance nor limit in any way the City's ability to enforce any ordinance provision." I - USE 7'FPERMIT ZONEA24 NUMBER JU13 AD . DRESS 4341- 3rd Ave. South 44 .EGAL DE2SC70N CHECK[SUEIDIVISION NO. LID NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP EXISTING 14,9 'EOUIRED DEDICATION APPROVED BY PROPOSED I -A RIGHT OF WAY CONSTRUCTION PERMIT REQUIREnl/ W STREET USE PERMIT REQUIRED: W Z R VIE SEE ENGINEERING MEMO DATED w BY Z REMARKS 111A inMA-y1AAjt7AjPzv h P�w j A METE?)f 2 rUILDING S PPLY SIZE Sy '_rRE UNITS REk4ARKS J�L U SIGN AREA ENV. REVIEW ADI N&Q ALLOWED PROPOSED COMPLETE EXEMPT C7, 1�� I Z SHORELINE N VARIA CE OR CU 5 - �6 PLANNING REVIEW BY �_i= h*2 DATE 1i SETBACKS - FEET Ir ll!7� I HEIGHT LOT COVER Li AGE FRONT SIDE REAR Z 5 a. REMARKS 90 A -7 /G, /q;�� �z_/j 5/ -'f �4-Ar- &ot� 02 01) 1406T,5�0 yh0/19 Ec CHECKE TYPE OF CONSTRUCTION CODE HEIGHT SPECIAL INSPECTOR REQUIRED AREA OCCUPANCY GROUP OCCUPANT LOAD Q YES.� � 0 NO REMARKS PROGRESS INSPECTIONS PER UBC 305 &� &,47 Ml)lb 647-,E�,O! /,Z//d8q PLAN CHECK FEE BUILDING PLUMBING MECHANICAL GRADING/FILL STATE SURCHARGE ENERGY CODE PLAN CHECK DEPOSIT TOTAL AMOUNT DUE J I hereby acknowledge that I have read this application; that the Information given is correct; and that I am the owner, or the duly ATTENTION authorized agent of the owner. I agree to comply with city and state laws regulating construction; and In doing the work authoriz- THIS PERMIT AUTHORIZES �j ed thereby/�o person will be employed In violation of the Labor ONLY THE i Code of t state of,Washington relating to Workmen's Compensa- WORK NOTED tion InsAlce. INSPECTION IGNA R ENT) DATE SIG NED DEPARTMENT r::��,si4ant 7a- 9/27/89 CITY OF EDMONDS A ON ?UNLAWFUL 771-3202 IT TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. 102-87 VALUATION j -.0/ e II—)VII Wo 0 r,4 JN71-1 .212.3 -51,01 APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. FFIf,* 1 NATURE ATE D BY- DATE ORIGINAL — File YELLOW — Inspector PINK — Owner GOLD — Assessor CITY OF EDMONDS USE Z ON Eft?, NUMBER 1 90040,9 CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF BUSINESS JOB ADDRESS 3rd.Ave. SO. BJORN THUESEN, INC. LEGAL DESCRIPTIZ') CHECKI SUBDIVISION NO. LID NO. Cc Lu Z MAILING ADDRESS LSe-- in 30: 322 main St. CITY TELEPHONE NUMBER PUBLIC R IG HT FAY PEUII OFFICIAL STREET MAP. TESCP APPROVED BY Edmonds 775-1953 EXISTING D� REO RED DEDICATION PROPOSE NAME 0 D. A. Hermans Co. RIGHT OF WAY CONSTRUCTION PERMIT REQUIRE K er LU LU)i ADDRESS STREET USE PERMIT REQUIRED:' W Z 0 11416 Slater Ave. N.E. SEE ENGINEERING MEMO FEVfflW By Z LU cr CITY TELEPHONE NUMBER Kirkland 827-2763/775-1953 REMARKS NAME J 1217 11,1,0 1'1/� BJORN THUESEN, INC. ADDRESS A I 322 Main St. MEIER IZE BUILDING SUPPLY SIZE IXTURE UNITS CITY TELEPHONE NUMBER r M W Oz Edmonds" 775-1953 RqMAR S 0 STATE LICENSE NUMBER BJORNl*225BZ SIGN AREA ENV. REVIEW ADB NO Legal Description of Property - include all easements PROPOSED COMPLETE EXEMPT , - cc Z _Cshow below or attach two copies) SHORELINE# 2 Tlie easterlv f t. of north half of the northwt-qt- quarter of the northeast quarter of the northeast cr ,L) Uarter of Section 26, Township 27 Nortiti, Rame 3 VARIANCE.OR.CU PLANNING REVIEW BY DATE Lu ,a East, W.M.; FXCIM the north 190 feet; and, EX=, < W roads. SETBACKS —�FEET HEIGHT . I LOT COVER GE --�5 Z FRONT SIDE I IEA( or Z 262703-1-010-0002 REMARKS t5( 0. NEW Fx� RESIDENTIAL 1:1 PLUMBING -7 ADDIALTER 7 COMMERCIAL 0 MECHANICAL REPAIR APT. BLDG. El SIGN P, r &J D 241020 *hf& EXCAVATE FENCE ECKE TYPE OF CONSTRUCTION CODE HEIG�H DEMOLISH OR FILL I— x _FT) V- /HK CARPORT swim REMODEL EIGARAGE El POOL SPFr A _7GROUP OCCUPANCY OCCUPANT 4 . WOOD STOVE/ E] RETAINING WALL/ INSERT RENEWAL PEQUIR�D.�' 4 3 Y E S, 0 No LOAD Z ROCKERY 0 EEC N RAW CO/V k # 2c) PR66"RESS INSPECTIONS PER UBC 305 Z 05 C Z NUMBER OF STORIES. NUMBEROF 2 DWELLING IuNiTs (Bldp,. D) 12 0 1 NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) MLiltiple. RM 2400 -TA LIU= la ­UATION FEE PLAN CHECK FEE !4c, A MVAI T_ U BUILDING 4tio Z alylr Ao7� 1-401, PIUMBING:�- I . 000, MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL Any constructiofi on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require separate permission. STATE SURCIQjq Permit Application: 180 Days Permit Limit: 1 Year - Provided Worl� is Started Within 180 Days ENERGY CODE A Qk "Applicant, on behalf of his or her spouse, heirs, assigns and o successors in interest, agrees to indemnify, defend and hold Luni harmless the City of Edmonds, Washington, its officials, m emp loyees, and agents from any and all claims for damages of a: < whatever nature, arising directly or indirectly from the Issuance of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEP2!� modify,.walve or reduce any requirement of any city ordinance 0 nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNI I hereby acknowledge that I have read this application; that the Information given is correct; and that I am the owner, or the duly A\,-TfNMX\ AIPPEODAT16N PRGPVAL authorized agent of the owner. I agree to comply with city and THIS PERMIT state laws regulating construction; and In doing the work authoriz- ed thereby, no be in AUT:60WES-�', jh0,app,98aAn is notLa,�ermit until ;,Igned by the Building person)vi�l employed violation of the Labor ON"JHE Official or his Code of tKe State of Ashington relating to Workmen's Compensa- WORK NOTED Deputy; an.1 fees are paw r�o receipt is -\a tign.1 yfince., 4 2! i*N . aekn'dw1*bed in Oace provided. 'A SIGN;AT#0R,O - - DATE SIGNED IN�PECTIA DEPARTMENT 7F3R_QrA`AGENT) resident 9/27/89 CITY OF EDMONDS ik 771 3�62 D: B �Y DATt ON UL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK Owner GOLD — Assessor 102-87 CITY OF EDMOMS CONSTRUCTION PIEWT1.14FRILICATION USE 'W,&RMIT ZONE NUM13ER JOB ADDRESS 430 3rd Avenue South OWNER NAME/NAME OF BUSINESS BJORN TRUESEN, INC. 7 E LEGAL DESC 7 CHECKr UBDIVISION NO. LID NO. z MAIUNG ADDRESS Z -322 Main Street PU13LIC RIGHT OF WAY PER OFFICIAL STREET MAP. EXISTING REQUIRED DEDICATION PROPOSE TESCP APPROVED BY CITY Edmonds TELEPHONE NUMBER 775-1953 NAME D. A. tiermans co. RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED XA STREET USE PERMIT REQUIRED. 5 ADDRESS E 11.41-6 Slater Ave. N.E. SEE ENGINEERING MEMO OAT d/ Aa Afiiyl�W BY Ic CITY 7 Kirkland 1827-11763/775-1953 :TFELEFHONE NUMBER REMARKS/,�' NAME BJORN TilUESEN, INC. AODFtES§,.z 322'Main Street CITY TELEPHONE NUMBER Edmonds 775-1953 STATE LICENSE NUMBER BJORNI*225BZ Legal Description of Property - include all easements (show below or attach two copies) The easterl� 40() ft. of north half c)f tho quarter of the northea-st quarter of the northeast quartpr of rrion 2A, Tcunship 97 Nnrti-. Rawle East, W.M.; U(CEET the north 190 feet; and, E)(CEW -roads. _A -CC 7 262703-1-010-0002 L.'�J N EW RESIDENTIAL El PLUMBING E] AOD/ALTER COMMERCIAL MECHANICAL REPAIR APT. BLDG. El SIGN EXCAVATE FENCE DEMOLISH OR FILL x —F' CARPORT swim REMODEL GARAGE POOL WOOD STOVE/ F7 RETAINING WALL/ INSERT ROCKERY RENEWAr) A"vi Cq rez_-X-�` NUMBER OF STORIES j NUMBER OF ,VE T�ING 2 UI41 , Bld_p,.A)22 NATURE OF WORK TO -BE DONE (ATTACH PLOTPLAN) Multiple RM 2400 CC W Uj Z 0 Z Uj METER SIZ 9; Z. o IBUILDING SVIPPLY SIZE 21 FIXTURE UNITS REMARKS < 4 E-6 jh 3 SIGN AREA ENV. REVIEW ADB No�� ALLOWED PROPOSED COMPLETE EXEMP T (2� I L1____ I ELIN VARIANCE OR CU PLANNING REVIEW By SETBACKS — FEET HEIGHTT COVERA 17-D Z FRONT( SIDE REAR Z REMARKS ;7 f- CL� -7 �kAr in 2:zs000 Po CHECKED BY /.I)TYP AONSTRUCTION /, j;� CODE HEIGHT is -A .SPr,GI,A4.r4NSPECTOR AREA OCCUPANCY OCCUPANT .REOVIRPD I GROUP I LOAD � n *S5 L7 NO REMARKS PROGRESS INSPECTIONS PER UBC 305 PLAN CHECK FEE BUILDING .51 PLUMBING,.� P-SM'1771M MECHANICAL This Permit covers work to be done on private property ONLY. GRA15516FILL Any construction on the public dornaln (curbs, sidewolks, STAT*ISUACHARGE driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit Limit: 1 �ear - Provided WorK is Started Within 180 Days EN - ERGY CODE r'A pp I rdva4, & behdf-of his"or her spouse, heirs, assigns and -S. Mssors I interest, --agree% indemnify, defend and hold trrple& rMit�- f-:::EdmOn � y__O I 5n s, Washington its officials, E employees, and agents.frorn any and all claims for damages of �z whatever nature, arising directly or Indirectly from the issuance r of this perrnit. Issuance of. this permit shall'not be deemed to PLAN CHECK DEPOSIT D I modify,. waive or reduce any requirement,of, any city ordinance D r nor limit in any way the City's ability to enforce a I ny ordinance -pr, *on." —,�, TOTAL AMOU NT DUE (-" 1�, - k I hereby acknowledge that I rhave read this application; that the .information given is correct; and that I am the owner, or the:duly ATTENTION authorized agent of the owner. I agree to comply with city and .state law's regula ng construction; and In doing the work-authorlz- THIS PERMIT AUTHORIZES ed thereby, Wnoeirson will. be employed in violation of the Labor ONLY THE I Code of the e of Washington relating to Workmen's Compensa- WORK NOTED - 4 A jj "nInsu 4 I NSPECTION DEPARTMENT SIGNATY11�1�0 �T) IDATE SIGNED identl 9/27/89 ,%�CITY OF EDyqNDS &TTPNT-.Ir)Kj .. ! I 1 11 771-3202 IT IS UNILA�VFUL TO USE OR OCCUPY A'�i;BUILD I N d OR STRUCTURE UNTIL A,�,OINAL INSPECTION HAS BEEN'MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. 102-87 a - eco .7 2 /V 102— APPLICATION APPROVAL This application is not a pe�mlt until signed byAhe Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. L' GNATUR E DVE ELE SE BY* DATE ORIGINAL — File YELLOW — Inspector PINK — Owner GOLD — Assessor E r-lTy nP 04 L A P WORK A D f'_liR_fE_-­SfS 4,lej A p -17 p 'Z� ��/' 4 6/9 � � 0_� CALL 2 BUSINESS DAYS BEFORE YOU DIG 1-800-424-6665 TION OF SECTION 26, TOWNSHIP 27 NORTH, RANGES EAST, W.M., SNOHOMISH COUNTY, WASHINGTON E- ll--'?�&NEN T--- SEMF _NT ----------- 10" ENCE PER DETAIL 9 LF CEDAR F BOLLARD SEE DETAIL E. GARBAGE SHEL CU SHEI TER fjBEpoLAss OVEPft� 510`^ 0 --EX. 8"ss E'. ov'c VALVE VAULT TE 'Q PVr. (IN--W) :E- 5- :I_ �*.11l (Iti !E- :4 - - - - - - 1. (1 1 �F P-IRMA14;1; al#E- EASM"; - - - - - - EX ASPHALT EX ASPHALT EX. BUG #432 771-7Z Ek CONDO BUILDING oroir, mo iwo[83N 5 2.5 0 5 10 sl uDij* LS *5 SITE PLAN SCALE� 1'=5' SCALE IN FEET GALV. FENCE RAIL SUPPORTS F(SIMPSON OR EOUAL). TYP 0 2x4 CEDAR TOP RAIL TOP RAIL JOINTS O_ AT POST. TYP — 2x4 CEDAR RAILS (2) H4- (TYP.) FIN SHED Z--PT FENCE POSTS, SIDE MAX. SPACING = 6*-O*OC t2"0 CONC SONOTUBE FIG ('rc 2.500 PSI) 0-i a;l A 'rlf%kl 01 =%I 4s, GRADE 2" CLR AT CONC. 9. 2- CLR (TYP z (3)#4 VERT, Eo (fy = 40 KSI) 0- 0- LAI 1 SECTION I FACE FINISH SIDE TOWARD ADJACENT RESIDENCE 2 SEAL ALL WOOD WI TH TWO COATS CEDAR TONE PRESERVATIVE 3 FASTEN FENCE MATERIALS WITH COATED DECK SCREWS I ) DETAIL - WOOD FENCE il) NOT TO SCALE ROUNDED CONCRETE CAP 4" GALVANIZED IRON PIPE TO BE FILLED WITH CONCRETE AFTER INSTALLATION AND PAINTED SAFETY YELLOW NOTE, DAWN MODEL BOS-4X-66RY WITH J-HOOK CAP (OR APPROVED EQUAL) MAY BE SUBSTITUTED FOR BOLLARD FABRICATED ON SITE. SUBMIT PRODUCT DATA SHEET FOR REVIEW '2-"\ DETAIL - FIXED BOLLARD NOT TO SCALE ;t a rn z 0 _n c===- z j ti) z oFn , < < Z mo C-L w W m 0) U. z (j) Lu 0 0 z u- RECEIVED 5 JUN 2 9 2012 DEVELOPMENT SERVICE.� COUNTER I S—E N/A 01 SHEET LS5-F e A, r, AA -3'0 OF SHEETS J100! E9GA-304 FIELD VERIFY LOCATION AND DEPTH OF EXISTING SEWER PRIOR TO CONSTRUCTION. INSTALL NEW 48" MH TYPE X WITH TOP SLAB, MH RING AND COVER TO MATCH EXIST. GRADE. FORCE MAIN INVERT TO BE 0.10' INSTALL 90* BEND EXIST. 5' CHAIN LINK FENCE ABOVE SEWER INVERT AT MANHOLE EXIT. WITH BLOCKING EXIST. POWER POLE \,�, � TEMPORARY CONNECTION 010e� SEE NOTE 8 BELOW. 30' PATCH PAVEMENT FOR INSTALLATION OF NEW FORCE MAIN. EXISTING >0- ASPHALT TO BE CUT IN A NEAT LINE AND TACKED BEFORE PATCHING. PATC TO MATCH EXIST. SECT N��. 1Z MINIMUM 4" CRUSHED ROC 2" ASPHALT CEMENT CLASS B. 165 LF. 4" PVC 51 FORCE MAIN ___� ,70 LF. 4" PVC FORCE MAIN EXIST. 2t ROCKERY TO BE 'REPAIRED AS REQUIRED /ASPHA/LT DR/IVE FM M M IN. EXIS ASPHALT DRIVE-4 EXIST. HOUSE EXISTING G AVITY LINE TO BE PLUGGED AT\tp APPROXIMATE LOCATION BOTH MANHOLES AND tp EXIST. SANITARY SEWER ABANDONED IN PLACE. SEE GRAVITY LINE NOTES 11 AND 12 BELOW. EXIST: 6' WOOD FENCE TO BE REPAIRED AS REQUIRED - i L A , / , / / / . /�� 1 7' _7` APPROXIMATE LOCATION EXISTING 4" C.I. FORCE MAIN CONNECT NEW 4" PVC FORCE MAIN TO EXISTING LINE. INSTALL BEND WITH BLOCKING AND FITTINGS FOR CONNECTION AS REQUIRED. FIELD VERIFY LOCATION AND INVERT OF EXIST. LIFT STATION EXISTING FORCE MAIN. VEHICLE ACCESS TO TOP ELEV. 19.37' BE MAINTAINED AT ALL TIMES. LEGEND: NEW 4" FORCE MAIN _SS— EXISTING SANITARY SEWER <:=P EXISTING SHRUBS EXISTING SANITARY SEWER GRAVITY LINE FORCE MAIN INVERT TO BE 0.10' ABOVE GRAVITY LINE INVERT AT M.H. EXIT--, 0 4" FORCE MAIN PROVIDE CHANNELING TO 6" DEPTH EXISTING GRAVITY LINE TO BE PLUGGED 48 INCH MANHOLE DETAIL N.TS. EXISTING ROCKERY EXISTING MH TOP ELEV. �fl.32' INV. ELEV. 39.67' PLUG EXIST. 4" C.1.'FORCE MAIN AT MH. Ui W zi W Ir ro +11 0 WALNUT ST. HOWELL WAY GENERAL NOTES: 1. All construction shall conform,to the "1984 Standard Specifications for 8. The existing sanitary sewer system is to remain in operation at all Municipal Public Works Construction" and standard plans as adopted by the times. Tenporary connections are to be made as required to keep system City of Edmonds, and, any requiremnts established, at City,hearings on in operation. Any damage which occurs as the result of the system not this project'.: being kept in operation shall be the Contractor's responsibility. 2. The Contractor shall notify the.City of Edmonds Department of Public I I 9. Existing house and foundation to be protected during construction. Any Works 24 hours prior to and'�uirin�g work o btain all require d. permits I I damage shall be fully repaired by Contractor' prior, to construction. Corttiactor to. obta ' in approval of and coordinate with apartment owner prior to construction. 10. New 48-inch manhole to be channeled to a minimum 6-inch.depth. 3. The Contractor ' shall notify'the,C ' ity of Edmonds Department of Public 11. Field verify that side sewer on existing house is not connected"'to Works prior to backfilling',utiliLies. gravity line to be.abandoned prior to abandoning that line. 4. Existing underground facilities have been shown on these . drawings for the 12. Plugging of sanitary sewer lines to be with non -shrink grout to a�minimum purpose of ' assisti.nq the Contra6tor in locating said facil 14t. ies-in the 12-inch penetration that will assure a watertight and leakproof seal. field. The. Contractor shall betesponsible for checking I actu ' locations ql in the field, and checking with appropriat& agencies,tfiat'may have underground f aicilities within the project limits. The Contractor shall be solely responsible for'Any danage to underground facilities resulting from his operations.' 5. A copy of these'approved plans nest be on the job site whenever I V gz.' construction is in progress. FEB 18 1988 PRINTED 6 A1.1 shrubs/trees that are disturbed by construction shall be root balled prior to.removal and stored on property. Replant trees and shrubs equal ENGINEERING FEB 17 M to existing conditions on site prior to work or relocate as directed by the owner. M& MOOLOON a ASSOOM 7. All pipe and fittings shall be AMM D2241 SDR 26 PW 1120 pressure pipe, Class 160 with rubber gaskets. Force main shall be installed with 18-inch.'minimum cover except as noted Blocking on plan. on all f ittin s to hav�e minimum olf 2, cubic feet of concrete poured against undisturbed soil with,3/4-inch anchor bolts to resist resul , tant forces. Bedding of "Flexible SANITARY SEWER PLAN the pipe shall conform to Section 7-10.3 (09) B, Pipe," which requires 3/8-inch minus sand/gravel mixture placed to a depth of 4 inches FOR under the pipe, -and, extending 6 inches over the crown of the pipe. ROBERT -CASTEEL IN PTN. NEI/4, NEI/4, SEC.26, T.27N,R.31E., W.M. EDMONDS, WASHINGTON 37/� 4:7. Reid, Middleton & Assodates, Inc. _J 0 Engineers 9 Surveyors e Plonners 121 5th Ave. N., Suite 200, Edmonds, WA DRAWN CHECKE DATE FIELD BK. CALE FILE NO. 02-87-121 i W. C. J. S. AN. '88 599/38 1 20' 1 SHEET OF I LAYOUT LEGENP TgAW�5FORMEK5 r?c?m-r xrmK A- 19579 -3-7, s, KvA T ppli ur="r2 Flp-1 —x -0- P0 L- 0 V H V MAKI�- A— 19580 -7 K VA 0 1 '!�' -r 5 - x MAKf::� 5C,H-EMATIC LE6EWP rc2m-r xr-m F?l PP-1 LJOWt2 CA P u "--2 E'r 0 v t VA U L—r!�� 4 1 a x 4 1 5 X3'6" VAULT WITH 41 0 X 4'6 X L- I P e, z UN I-rl-5 1510 A19579 Z UN u ki I T�' r—Fr 7 uNrrl�- F 41T77 4 HowF-L.L. WAY CAE�[,F, rozol or- 1/0 AL, cmc-rpc we�u-r L-25, JACKE�TF-P F21 MAKe FO 50' Or Z" P\,/C 0,Y PUP (OrF-W CUT 9[2) OF: Z" F7\/C E�,Y CUC2-r c )�N- 19 5 7 9 1, A Ar I C 15 C H E ivi N T 15, PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY REV. 7187 N. 4510 5KI2 AV S 1-50UTH COUKI-ry AREA POLE NO. W151/4 S Z6 T VI R DATE Z W.O. NO, 16 8306 REASON FOR WORK fp- 9:0 v I P F, PIZ I I-IGN112 I !:k ENGINEER ?A'rC H E-rT OWG. NO, 06-7614 ro v, 1--ry- 2ARK, AFT-6 DRAFTER U.G. NO. (ZO) u w I SCALE APPROVED DATE WORK COMPLETED FOREMAN ENVIRONMENTAL ANALYSIS X EXEMPT 0 NOT EXEMPT SUBSTATION' W 615-66A-1715- FEES REO'D M YES 0 NO ITEM C PARA. 18 PRIMARY OVERHEAD CIRCUIT NO. I Z— 4057 PHASE 6 . KV 0 RESIDENTIAL U.G. COND. 0 COMMERCIAL ADD CKT.� FT. PH ROAD CROSSINGS ONLY DATE DWG. NO. LEO# REM CKT. FT. PH NET —4 9 7 CKT. FT. SECONDARY OVERHEAD O.H. U.G. COND. kv REVISIONS BASIC FEE $ ADD CKT. FT. PH REM CKT, FT. PH I APPR NO. DATE DESCRIPTION NET CKT. Ft METERICONV. POLE $ PERMITS (DATE GRANTED) PRIMARY UNDERGROUND 0 TREE TRIM 0 RESIDENTIAL 0 STATE 0 COMMERCIAL 09 COUNTY 512HOIQP'�' BASIC FEE $ LEU #' 0 CITY n SECONDARY UNDERGROUND EASEMENTS CR REQUIRED 0 NOT REQUIRED BASIC FEE $ UNDERGROUND PLAT BASIC FEE $ DATE RELEASED FOREIGN CONTRACT$ —1 FT.@$ 0 GTNW JPN # STREET LIGHTING 0 CATV JPN # t FT.@$ 09 JOINT TRENCH GTNW CATV.. WORK IN RIGHT OF WAY 0 JOINT BORE GTN & CATV 0 PRIMARY W AS -BUILT 0 SECONDARY POLE STENCILING t FT. @ $ $ FROM TO APPR NO. DATE DESCRIPTION MISCELLANEOUS FEES��,:;8 TAKE OFF POLE VAULT $ PRE-CONSTR. REQUIREMENTS PERMIT $ M TREE TRIM 0 PUD LOCATOR, .$ 54 BACKHOE 0 ONE CALL DATE TOTAL DUE $ INDEX POLES L09S U.MAP-1 DATE PAID RECEIPT # XFMR -MAP NEW SVCE APPILICATION # LOCATION MAP PAGE DATE PRINTED 7-7 DIOTHS 56 A B I", En ST7BL4KE 0, CHERRY ST sp A'� A VIE%aw --SUNSET UEAV 17 l?K rl �PAM z Ntll SA (A CARU 2 'jKlNGSl0- VNDERWA GLP % z ZA > P > mburs fUARY c "Nc :wv TI I .. $4 ON? ST NNE ST 3: Pr, I list"! > 4 VICINITY MAP 118442 1� :Z 001 1� t 7 I Set the stal�es. 2. Excavate a 4"x4" tren,-h Filter barvier: This sediment barrier may be constructed usiol, Maintenance upslope along the line of Strenj",th nyt,thetic filter fabric. It is denigned 1:(,r low stakes. op inoder�,I,L flows not Lxceeding, 1 cf.4. 1. Silt fencer and filter barriers sliall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Any I T, 1. The freight of a filter barrier shall be a Minimwit Of 15 inches and required repairs shall be made irrimediaLely. shall not exceed 18 inches. Inould the fabric on a silt fence or filter barrier decompose or it become ineffective prior, to the end of the expect 14 2. standard strength synthetic filter fabric shall be purchased ed usable life and Lh,., barrier still be, necessary, the fabric .9hall. be replacLtl promptly. in a continuous roll and cut to the leng to avoid the use of joints (and thus improve the strength art(] efficiency of' ,th of the barrier 3. Sediment deposits should be removed after each storm event. They Flow must be rL-inovod wheii depostita reach approximately orie-l�alf Lhe heirlit 4" 3. The !;t,dws shall be spaced a inlaximum of' 3 fe-A apart at tho barrier (,f the barrier. 3. Staple filter material to 4. Backfill and compact the location and driven securely into tire- ground (mininjum of' 8 iiwhes). 4. Any --edirrient deposits remaining in place after the silt fence or, stakes and extend it into excavated soil. 4. A trench shall be excavated approximately 4 inches wide art(] I, inclies fil*Lr bilrrier Is 1`10 loiiEer required shall be dressed to custforin the trench. deep along tire line of' stakes and upslope from the barrier. witli ttw existing grade, prepared and seeded. .�ktqt:,, ih 5. The filter material shall be stapled to the wooden stakes, and 8 j; inches of the fabric shall be extended into the trench. Ifeavy duty not be qLapled to exi3tine troei. -ast 1/�'-inch lotij, shall be used. Vi I ter material r -44 Wirt. staples at lo shall 6. Thc trench shall be bac%filled and the soil compacted over- the filLor 11"Aurial. 7. If a filter barrier is to be constructed across a ditch line or swale, the barrier shall be of sufficient length to eliminate csid flow, awl the plan configuration shall rejemble air arc or horseshoe with CONSTRUCTION OF A FILTER aA,�MER the isids oriented Up3lope. 8. Filter barriers shall be removed when they have served their useful purpose, but not before the upslope area has been permaneiitly stabi- r_ I >A Tt _-E-1 11 F tF �7 lizLd. 1�7_111401 -7 1 I e7 NV -4,- -Tr� A_ A N --N it A-- 7`� - ......00000" T- I W r;: _,-A I r2 V vV -mAi L_ -rA i 'A LIN r2e42_4, # A W Ir 0, V, 41 "V, V, A e. 1< IF Y? 5 U k_1 PAC E /�A C� 8 7. _1[ I t a L4- T C.-L-i L-V e-p-_P5 ra-z-7.4 -r \r IF, X /r- r- Z r-r-on- 71 '0 G`)QA65-L1NGtD 15WALF= od F_ T. 15. "YP I r I J1 L Iiiiiii - I I 77' A PLANT LIST FOR DRAINAGE SWALES yt;o mr I BOTANT.CAL NAMF COMMON NAME ITT Alopecurus prttensis Meadow Foxtail K/ undinceus Poir. Creeping Foxtail a Alopecqrus ar RedLop Agrotis alba (VI Festuca rubra Creeping Red Fescue Annual ryegrass(es) Lolium ssp., L. meltiflorum /r-r -zA. & Phalaris arundinacea Reed Canarygrass Z K Phleuni pratense Timothy F r- i_� YE 'New Zealan Trifolium repens d' White Clover taken from: for Soil Conservation in the Pacific L all Grasses and Legumes 4- Agricultural Handbook No. 339, North U.S. Department of Agriculture, west and Great Basin States, L Soil Conservation Service, rel)rinL January 1979. J OY12 _4 1w- �,PL_L k LOW WALLS 3 3'.0' 11.1. 01-10, 11.1. 611 106 1.925 0,690 2.790 5.56 4 3'.5. 11.3. 01-10, V-4' M 82 3.036 1.20d 2.513 6.75 1.,. o'.10, V-1u, 8/U 134 5.080 I.M 2.643 6.13 6 o'.10, VUJ IOU ?.656 2.1160 2.06 V.61 I/B lo.!Idia 4.051 1.61 � 11.00 fill 21Y 14.4Y/ !,.52J, 2.624 12.42 9 6 -3 1:-o: 0:. 1, a: 2 .1 a. 0 :a 314 Jil 111111/0 �.300 1.!0112 13.7Ja to 6'-Y' 2'-4* 0'- 10* 3'-1' 1440 243 24.05V VAIU 2.4151 Moir HIGH WALLS 1 0 6:-9: 2-4: 1:-,1: 3"-1: 446 262 24.983, 10.017 2.494 14.81 11 1 -3 2 , -6 1 -a :606 161 31.364 11.720 2.466 16.d6 0.061 '1.443 IV.04 13 V-4- V-lul 1,.,. 4'-4- 1 YOU '1110 40.704 1 V.4/4 2.4/4a 21.44 14 ".9. J,-U. 11.3. V-4- 2uyi '156 !16.1116 21WI �AUII Y3.// Is 9'-4- 31.,. 1,.,. 4'- 10' Mu 1U6 68.OdJ 20.243 2.43V 26.42 16 "I.Y. Y-4- 11.4- 11.1. �420 2�1 7V.164 33.464 2.384 29.ou :7 lo:-4' 3'-6* 25�6 2ul 94.193 39.286 2.413 31.91 a 1 0-10, 271 U 2UI 109.851 4!a.741 2.AU2 34.84 19 1 3 , 1'. 'IY 0 24 24.!a6 52,86 2.356 37.78 20 1:1*9: I'll 60.6d 1 2.340 40.0 4 - .6 6'.2- 3U42 745 141.985 1 1 1 A 33*40' or "0. 0 0 P So 0 171.1 S IS? [C- L ALTEHNATE ONE LENGrH ?-OPTIONAL LUG AND 51101'IT "0 "0" HAUS UAHS - SVACING So SPACING So FIG. 14-1 BAR DETAILS AND NOTATION- LOW WALLS LOW WALLS -Dowels only -No Splices 3 #3 (,.1 18 11.5 - - - 13 a 2'.6 (-,- In 14 (,it 10 0.6 0.070 4 13 vo 18 11.7 - - - #J . I% I I I,,, 111 14 (.at 10 9.9 0.039 5 1301 18 11.9 (h. - - - 03 .:V-7 (". to 14 (-,- 10 11.1 0.067 6 13 (,,1 12 V-11 less - - - 13 . 4'-7 bl. In 14 (,It 10 14.2 0.106 7 13 fai 8 21.1 top 21.7 - - 13 . 4'-8 bn In 14 (,It 10 15.3 0.157 8 14 ('Ji 11 2'.4 cover) 2'.9 - - 13 at V-0 (,it 13 14 01 1 D 18.5 01223 9 14 (al 7 V1 2'.6 V-0 - - 14 x V.0 (-,1 10 14 (In 10 22.0 0.305 10 14 Na 6 21.8 3'-2 - - 14 A V-0 01 16 14 (,it 10 28.6 0.408 HIGH WALLS -Close 0 Tension Lop Splices 10 14 ot 0 2-41 V-10 V. 3 13 (,it 9 V-6 14 x V.0 Vv I 61/a 15 (,it 13 77.S 0.2113 11 14 (,at 6% V-7 ,,.I V-3 13 (m 7Y, 6'. 1 14 al $'-0 (,,- 13-/l 15 (w 13 32.3 0.349 12 #5 VA BY, 3'. 4 4'.8 I'-ft 14(,119 61.7 15 X V-7 (m 111/, 15 W, 13 40.3 0.473 13 05 (,a, 7 V-6 41-11 I'-B 146119 P-I #5 x V-6 Im 1411, 15 Vs- 13 45.0 0.504 14 060,9 V-9 S'.6 2'.0 14 (,at 0 71.7 16 x A'.0 0, 1711, 1.5 6.113 53.8 0,594 is 16 WA 7 Va 3'.11 V-9 2'.0 15 (,it 9 81.4 06.6'.5 W. 15 05 1, tI 13 65.4 0.03 16 41.7 61.1 2'.0 150119 8'. 10 16 . 6'.7 01 13 3 0- 13 73 2 0 * 800 11 17 (,at 7 Ili 4'.5 6'-9 2'.9 15 (", It 91.4 17 . I'll "', * 1:: IS ("t 17 011.2 0.916 Is '761.7 41.7 11.2 2'.9 16 (,it 9 101-o 1, 11 . 7: 111- 3 l/a af,5 1- 11 I o4,7 1.041 19 1861.8 4'-10 8'-0 V.8 16 (,,1 9 101-6 10 . 9 .0 1­16 15 f"I 17 20.11 1.175 20 18 (,it 7 51.1 81.4 V-9 170,9 111-6 #8 x 9*.2 be 14 '501 12 146.7 1.310 APPROVA APPROVED FOR CONSTRUCTION BY Ago;;�r1k QUARKY 6PALL eACKFILL rul Lear In I a (1) Size categories shall Include: Two -man rocks (300 to 600 pounds). 13" in least dimension; to 4t60 6 Three-man rocks (800 to 1200 pounds), 16" in leatit di- menallon; and Four -man rocks (1500 to 2200 pounds), 18" In leaUt di- Z4# mansion. Four -man rocks shall be used for bottom course rock In all 1, 1141 rock retaining walls over 6' in height. Die, 1? (2) The rock macerIal shall be as nearly rectangular as possible. NO stone hall be used which does not extend through the W.1 11 . Then rock material ahall. be hard. sound, durable still Z. free from weathered portions, acama, cracks. cither defects. W The rack density shall be a mininium of 160 pounds per cubic ,4 Cj avoos, foot. a b The retaining wall shall be started by excavating a trenelk, not leas than six (6) locheii or taloare thao oite (1) toot lit depth I)CIOW - FIL-17EK FA15RIC subgrsile fit exclavatioti �ectious or below Lite existing groutid MIKAFI 140 OR level Lot calbanionent sections. Rock selection and placement shall be UUCII that thel'tu Will be itilitlintsin voldn anti. Jai the exponed face of the wtill, tin upen voids over six (6) Incites across In any allarecticto. The flival course . 4V sli,ill I"we a cotitinuoun appearance still bit placed to minimize erosion of tire backfIll. material. Tire larger rocks shall be placed at cite 61 I-ERP. PVC base of tire rockery no that the wall wil I be stable said have a L 4qOO 0 X, NLhblo appearance. The rocks shall be placed In a matiner such that longitudinal axis of the rock shall be at right angles or perpen- dicular to the rockery face. The rocks shell have all Inclining faces slopling to the back of the rockery. Each course of rocks shall be seated an tightly and evenly as possible on the course beneath, Afteruetting eachcouraeof rock, all I vuldubetweei, the rocks &hall be chinked on the back with quarry rock to ell- tj minate any void sufficient to pass a.2-Inch square probe. The wall backfill shall consisi of quarry spalla with I a maximum RDCKF_KY DeTA I U size of four (4) Inchusand a minimum dize of two (2) inclieu. This material shall be placed to an eight (6) Inch minimum J-47. 5. thickness between the entire wall unit the cut or fill ittaterlul. Tire backfill material ahall be placed in lifts to art elevation approximately nix (6) inches below the top of each course of rocks as they are plecalid, until the upperuicaut contrite In placed. May backfill materlal on tire hearing surface of one rock course shall be removed before RULting the next course. Wheat a'sidewalk to to be built over a rock reLiAliting wall, the tell of the wall ithall be nettled atki leveled with u Call Constructed of cement concrete. Class "C" in accordance With the applitable provisions of Section 6-02 of the Standard Specifications. but with reduced witter content resulting in ulutup of riot over two (2) Inches. 1_4 .1-- G IT DATE 9 11-50 VICINITY MAP GRADING AND T.E.&S.C. PLAN �4NIP',,J 1. 11Q11 Ccl'."�, FOR ",Z V IA X ft 2TS �,N CITY PARK APARTMEi\j ITS 1014AL IN NE 1/4t SECT ION 267 T 27 N, Re 3 E.t We M. 9 AAA 9 09 'EDMONDS, WASHINGTON IR W V. 'MAIR -0 -1990 Lovell-salueriand & Associates, Inc. Engineers / Surveyors / Planners / Development Consultants 4-1. M 19400 33rd Avenue W., Suite 200 - Lynnwood, WA 98037 *(206) 775-1591 - (206) 340-0830 DRAWN CHECKED I DATE F.B. SCALE FUX NO. 1876 1GPr__1!Yr Z 11,11P .51 442 10 :z 0 t �A 0 � .'es-00 0001�_�_ //,/v zj\A \11\; , / I GENERAL NOTES 1. LOCATIONS OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL UTIL- ITIES AND IMPROVEMENTS TO AVOID DAMAGE OR DISTURBANCE. 2. ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICA" TIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIRE- MENTS ESTABLISHED AT CITY HEARINGS ON THIS PLAT. 3. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTION BY THE CITY OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 4. ALL WORK WITHIN THE PLAT AND CITY RIGHT OF WAY SHALL.BE SUBJECT TO THE INSPECTION OF THE ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO INSURE SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL OF ON -SITE EROSION HAS PASSED. 7. ALL STORM SEWER PIPE SHALL.BE CORRUGATED METAL 16 GA. .GALVANIZED AND ASPHALT COATED TREATMENT I OR BETTER, CORRUGATED ALUMINUM PIPE, 16 GA. OR PVC. 6. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 1. ALL ROOF DRAINS SHALL BE CONNECTED TO STORM DRAINAGE SYSTEM. 10. AUL W-0017 011;ZAIN 'E��TUO:-:> 5HAL.L. t36 MAWKED WITH 0"x 4" PoeT �5HOWIW6 OEPTH 6�V-410 KAAI�ZKeO 11 4) _sse,� ------------ 77— - . .......... J t Inspection & Sampling Too (by others) Oil Retainer Baffle Vault No. 660-SB 5,750 lbs. I 012-P Diamond Plate Inspection Covers 222-P Diamond Plate Cover 23" 2 1 12" 6'0" 1 2.. 24" 24" --tl 2" 24" 4- 24" — NO. 222P B -*J 2 NO. 101 2P DIAMOND DIAMOND PLATE COVER PLATE INSPECTION COVERS A61 PLAN— BASE PLAN —COVER 7-4-V 2 No. 1012P DIAMOND PLATE IVI e�� NO. 222PDIAMOND INSPECTION COVERS (ki V. I & PLATE ACCESS DOOR OIL/WATER fl HOLE TYP SEPARATION CHAMBER N L INLET EA' END FOR INLET & OUTLET hole each and OIL RETAINER 0/,—BAFFLE for inlet & outlet L A FLOW DIFFUSER BAFFLE 0. 0 GnIT/SL UDGE a.. RETAINER WEIR 11 lo 'F 0.1 48-1/2" 0 0 INSPECTION & .0 0: 0 SAMPLING TEE (BY OTHERS) 1 1 12" 1 0, 1 0 1 7. 5-1/2 23" 21" 4'0" 116" GAI VANIZED STEEL PLATE BAFFLES &WEIR HOTF-: umuTy \/ALJL.—r e5.,';1MANY SECTION A -A SECTION B-B o&z,e,?-6A &-iopirs-t2 -ro r-l-r) INATER/01L SIF-PARATOR (M0D11=1r__tD rO 640 0 W.TG. �A I y-A;?_P 7M_z7 0 U) 0-11 > < CITY PARK APARTMENTS. I N NE 1/4, SECTION 26, T 27 N., R. 3 .1 W. M. EDMONDS, WASHINGTON MAR 3 0 1990 1 —.1 C�lr­