Loading...
434 3RD AVE S.PDFIIIIIIIIIIII 4982 434 3RD AVE S ADDRESS: L4�9 ��, ,TAXACCOUN4ARCE'L#: BUILDING PERMIT (NEW STRUCTURE) #: COVENANTS (RECORDED) FOR: CRITICAL AREAS #: DETERMINATION: [I Conditional Waiver E] Study Required E] Waiver CRITICAL AREAS #: DETERMINATION: Conditional Waiver E] Study Required El Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit #'s): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: —FBLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED: L STREET USE/ENCROACHMENT PER�lf #: FOR: WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc APPLICATION EET FILE for The City of Eclmoncl� SIDE SEWER PERMT EASEMENT No . ......................... ................. NEW CONSTRUCTION 0 REPAIRS 0 too- 01360 OWNER..... HLI-It-3 ---- &-HaSAM . ...................................... --------------- CONTRACTOR .................................................................................................. PERMIT No . ...................... ADDRESS .43-0 ... ard.-Ave...s. .......................................... LEGAL DESCRIPTION: LOT No . ............................................... BLOCK No . ............................................. NAMEOF ADDITION . ........................... . ........................................................................................................... 0 lq7a Dy TaSfa.d 0/) S q-wer (&P*irs) Approved: DATE................................................. By ...................................... I .............................. CITY OF EDMONDS t90 19" T D C Address of Construction: Property Legal Description (include all easements): iiiiiiiiiiiiiii IMF I WMPW� W- e .1, S I'D E' ;S E E R M I T 0 RECEIVED EDMONDS I SEP, 2 0 ISSU TREATMENT PLANT PUBLIC WORKS Owner and/or Contract r: y .-,- C, x2 �;l State License No J2 R—O.LAJ 17 1 &�4 Building Permit No. !?zo,6> 4z 13 Single Family Multi -Family (No. of Units 0 Commercial 0 Public Invasion into City Right-of-Way:p No El Yes RW Construction Permit No. Cross other Private Property-.,Z No 13 Yes Attach legal description and copy of recorded easement Tcertify that I have read and. shall 'co—mply with all city requirements as indicated on the back of the Permit Card. Date * CALL DIAL —A —DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC.WORKS DEPT& Permit Fee: 30 Issued By Trunk Charge: 17-5 Date Issued: Assessment Fee: Receipt No.: 3 L954 Lid No.:— Es-f_ /0!3 Partial Inspection: Date I nitial Comments. Reason Rejected: Date —initial Final Inspection Approved: Date7—(--. initial r—* PERMIT MUSTBE POSTED ON JOB SITE White Copy: File -,,qreeTi'Copy: Inspector Buff Copy: Applicant Rev,sed 3!90 Side Sewer Drawing The, City of Edmonds EASEMENT NO. .- .................. --------------------- NEW CONSTRUCTION REPAIRS F-1 LID NO . .................. . ASMT. NO . ....... ........ OWNER------- ............................ a 0" ------------------------------------------------ CONTRACTOR .............................................................. ..................... PERMIT NOBZ� JOB ADDRESS ------------- 14V ------------------- ............... LEGAL DESCRIPTION: LOT NO . .......................... ........... BLOCK NO . ........ .......................... ....................... ............. .......... EVVIONDS ........... ..... TREATMENT PLANT NAMEOF ADDITION ................. ......................................... ........... ---------------------------- .................. 117 Lhl a 107, 0 0 i,�AAtA tAomc-, 0 fuvif-5-m- wu Wol 4 2, 8 37 3 I I --- 74,'— 1 YAO e-�-v -1v PWW-0001 -11175 (REV. 11/78) 1+32- 3D 43 q- Appro��d: DATE ... ....... ---- By ............ ......... W k !-V� 7EW SIDE SEW-R.,-` -13MIT".. CITY OF EDMONDS PE 0 P�RM'lt 825 STREET'FILE Address of 'Construction: Property Legal Description (Inclucleall.ibasempnts): _7 RECEIVED EDMONDS lK.tAIMEN11 PLAI�Ti SEP 2 0 189U PUBLIC WORKS 2 Owner and/or Contractor: Ve6 -e- -s_> 1Z iZ c, L­-� z 2 Building Permit No. State License No./9- 13 Single Family' Invasion. into City Right -of -Way: No. 11 Yes E� Multi -Family. (No. of Units /2— RW Construction Permit No. 11 Commercial 'Cross other Private Property; Q,'No El Yes 11 Public Attach legal description and copy of recorded easement I �_ertifj_that I''have read a-nd s'hall com'Ply with all city requirements as -indicated on the back of the Permit Card) 7 OrC> Date CALL DIAL -A -DIG (1-800-424'-5555) BEFORE ANY EXCAVATION' OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. -Permit Feb: Issued By Trunk Charge:— Dat e Issued: 9- 2,0 -qD Assessment Fee:. Receipt No..: 13os7 Lid No.:—, Z-10 E_Sklol Parlial Inspection: Date I nitial Comment� Reason Rejected: Date —Initial — Final Inspection Approved: Date I niti6i 'PERMIT MVAT BE POSTED ON JOB SITE White Copy: File Green Copy: Inspector Buff Copy: Applicant Revised 3!90 Side Sewer Drawing The, City of Edmonds I NEW CONSTRUCTION &�' OWNER.......... .................................... ------------ ................. ri, \�D JOB ADDRESS iL --------------------------------- Lurl a IN aq-1 0 0 i,,AAa �Aomc, 0 yu me 6-f 4- W CT Wo EASEMENTNO . ................. — ----------------------- LID NO . .................. ASMT. NO . ....... CONTRACTOR----------- ---------------------------------- .......... --------------------- .... PERMIT NO. - . . ............ LEGAL DESCRIPTION: LOT NO . ................ ................... - BLOCK NO . ................................... ------------------------------------- ---------- EJDrAONDS -------- TREATMENT PLANT NAMEOF ADDITION ....... .................. ---------------- ..................... ........................... ......... P; 37' — 1 11 1 k REPAIRS F� L4 3 Z t j 3o 43+ 74,'— ----------- lilt e �-T� 4 YAL� 6�p J-.Pprove ------------- PWW-0001 -11/75 (REVA 1/78) DATE ... ....... .. ...... --- - -------- & "SEWER �`A-RMIT. CITY OF EDMONDS- SIDE PERMIT 3 2 9 FILE I I 1 1 91 S T L Address of Construction: ef: Property Legal Description (Include all easements): V e- 1 6 C., I R 'EIVED F TREA1 MENT PLANT RF-p a Pj18L1_G WORKS 4,P i J Owner and/or Contractor: J-2 *,- -Y C c- State License No. R 9- o "4--, 471 GP Building Permit No. 13 Single Family Multi -Family (No. of Units Commercial 13 Public 11 Invasion into City Right -of -Way: Od No El Yes RW Construction Permit No. Cross other Private Property: No El Yes Attach legal description and copy of recorded easement I certify that I have read and -shall 6-0-mply.with all city requirements as indicated on the back of the Permit C�rd. C) Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. Permit Fee: 30 Issued By JZ.6 Trunk Charge:-2.00— Date Issued: 4��2,40 —�?O Assessment Fee: Receipt No.:. /,306-7 I �47 Lid No.: Sg Partial Inspection: Comments Reason Rejected: Final Inspection Approved: Date2-1-11( Initial le4 Date Initial Date —Initial ** PERMIT MUST BE PO W�Ite,c.opyl. File Gre�;Gopy: Inspector ED ON JOB SITE Buff Copy: Applicant Revised 3!90 Side Sewer Drawing The City of Edmonds EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION REPAIRS r-j LID NO . .................. . ASMT. NO . ...... ........... 7 MIT NO. OWNER-------------------------------------------------------------------------- * --------------------- CONTRACTOR .......... .......... ........................................ : ..................... PER fLo Yu t- �,c . ...... ..... LEGAL DESCRIPTION: LOT NO . .................. ................. BLOCK NO . ..... ..................... JOB ADDRESS --------- ......... ....... I ........................... .......... EDUONDS ........... ... TREATMENT PLANT NAMEOF ADDITION - ............. ....... ............................................................................................... I rl a N 0 0 MArA tAomc, 0 &M F - \14F-T 37 3 4 3 z �p 4p :*- -,v- 1 30 1 41�1 3D, 43 q- ----------- V.t, T A A YAO e-�v SA -a PWW-0001 -11/75 (REV. 11/78) DATE ....... L-ACtil.... By",-� *REET FILE' Cl TY,OF EDMONDS SIDE �..EWEVPERMIT 8 910 PERMIT' -NO- 88248 c�- Address of Construction: Property Legal Description (Include all easements):­ EDMONDS TREASMENT PLA"T 0 RECEIVED SEP 2 O'IWU PUBLIC WORKS Owner and/or Contractor: �g�nw-Aj C'.1 Jrt. R zc_3 X� Y- l,- 4 State Licens*b No. -if -r e) C- Z 71 Building Permit No. 13 Single Family Invasion into City Right -of -Way: Q No El Yes �2 Multi -Family (No. of Units RW Construction Permit No. 0 Commercial Cross other Private Property �v No El Yes 0 Public Attach legal description and copy of recorded easement ri T-certify that I have read and shall c6-mply with all city requirements as indicated on the back of the Permit Card. �?_ Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3202, PUBLIC.WORKS DEPT. Permit Fee: Ro Issued By a(7 Trunk Charge: 510 Date Issued-. 1?_2_0 _­90 Assessment Fee: 1. Receipt No.: 1.30.5-7 Lid No.: 'F.6k 10 q Partial Inspection: - I Date —Initial. Comments (2 Reason Rejected:- Date —Initial ction Approved P Final Inspe' Date _—I_�L Initial PERMIT MUS, BE POSTED ON JOB SITE White Copy: File Green C opy: Inspector -Buff Copy: Applicant Re�ised 3!90 The City of Edmonds Side Sewer Drawing EASEMENTNO - -------------------------------------------- NEW CONSTRUCTION REPAIRS F� LID NO . .................. ASMT. NO . .................. OWNER......... — ------------------------------------------------------------ ------------ ---------- CONTRACTOR. ............ ................ ------------------------ .............. — .... PERMIT NO. JOB ADDRESS .... Aji ..... ---------- ... LEGAL DESCRIPTION: LOT NO. ...... ................. ....... BLOCK NO - --------- ................. .......................... I ---- ---------- EIMONDS-- .... ... TREATMENT PLANT NAMEOF ADDITION ------------- .................... ----------------------------------------------------------------- w ------------------ K MQL�j - P;P q CA V4 V L4, T tl 0 0 IA * k c-, 0 WET WV( A 0 U. PWW-0001 -11/75 (REVA 1/78) Appro;�-d: --------- DATE..� ....... .... Byz�� .............. City of Edmonds Critical Area Notice of Decision Applicant: ,70( M 04ci Property Ownet: Critical Area File 4: C/2/�_ 0 ci 0 (0 - Permit Number: --- )0 Site Location: A-V-2 5 Parcel Number: 007!�9 00 0 120 -5-00 Project Descriptio n: Z-, �t- S-- Vonditional Waiver. No critical area report is required for the project described above. —C there will be no alteration of a -Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. F-� Critical Area Report Required.* The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40! 120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public. health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordancew.ith ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-1 Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. F� Conditions. Criti cal Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). Reviewer J Signature V 7/10 /12- Date I Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 City of Edmonds Critical Area Notice of Decision Applicant: Property Owner: Critical Area File '�-FIA -'3) 0 C, 7 iq 0'�-B Permit Number: Site Location: Parcel Number: Project Description: L-,4 SQA-,�— r 1 �2\ \&.Conditional Waiver. No critical area report is required for the proj ect described above. I . There will be no alteration of a Critical Area or its required buffer. 2. 1 ,in ,,V'The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or-4 gp, 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. F� Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. F-1 Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1 The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. ISS 6h,� E] Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.1-60 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. 1-1�-'Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Fj Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). 0 -7-1 14-t I keviewer �ignature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 Zone KrA4,'I Corner tJ Fiag- Setbacks Required Actual VLU BY A P Pr'�'Fllp V E D 183 Y L�A N N I N G Front fo 1, 0 Sides �.7 Rear v e Other -7' IX IIIVV-L. 1,9 .,!!: .0 lz P-lp- ee_' Al< -77 P VL-- 4:: r -- - ---------- L -L-TT-L rz JI r- r r �11 LL ITT lz� y4mx�> r_1114N I r OP) Lv -F-,. n- -1 U N/ 2 7 2 0 11 CITY,'C)F EDMONDS CONFORMED COPY 2�1105180542 2 PGS 0 181JO11 4:15�m �P-00 SNOHOM Sh COUNT , SHINGTON Return Address: City of Edmonds 1.21 - 5th Ave. N. Edmonds, WA 98020 ACCESS AND UTILITY EASEMENT Property Address: 428, 430, 432, 434 3rd Ave S., Edmonds, Washington 98020 NO EXCISE TAX REQUIRED MAY 18 2011 KIRKE 91EVERS, Snoiloatim G011111Y freasurer K!PKE S!L\1_EQS Assessor's Property Tax Parcel Nos.: 00799000110100, 00799000110200, 00799000110300, 00799000110400, 00799000110500, 00799000120100, 00799000120200, 00799000120300, 00799000120400, 00799000120500, 00799000210100, 00799000210200, 00799000210300, 00799000210400, 00799000210500, 00799000210600, 00799000220100, 00799000220200, 00799000220300, 00799000220400, 00799000220500, 00799000220600, 00799000310100, 00799DO0310200, 00799000310300, 00799000320100, 00799000320200, 00799000320300, 00799000320400 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, 3n' Avenue Condominium Association, hereby grant to the CITY OF FI)NIONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a sanitary sewer lift station and appurtenances, over, across, through, and below the following described property, and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said sanitary sewer lift station and appurtenances, together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is more particularly described as follows: A UTILITY EASEMENT OVER, UNDER AND ACROSS THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, WM, SNOHOMISH COUNTY, WASHINGTON BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED AS -CONSTRUCTED CENTERLINE OFTHE LIFT STATION WET WELL, FORCE MAIN, VALVE VAULT, OVERFLOW STORAGE VAULT, ELECTRICAL CONDUITS AND ENCLOSURES; COMMENCING AT THE SOUTHEAST LOT CORNER OF THIRD AVENUE CONDOMINIUM, AS RECORDED UNDER RECORDING NUMBER 9110315001, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. THENCE NORTH ALONG THE EAST PROPERTY LINE N 00'38'39" W 10.57 FEET TO THE TRUE POINT OF BEGINNING; THENCE N 73'19'03" W 34.47 FEET; THENCE N 84ol 1'39" W 73.16 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 33.68 FEET, ALONG THE ARC OF A TANGENT CURVE TO TTIE RIGHT, HAVING A RADIUS OF 30.00 FEET, THROUGH A CENTRAL ANGLE OF 64ol9'54"; THENCE N 19'5 1'45" W 44.11 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 25.21 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 20.00 FEET, THROUGH A CENTRAL ANGLE OF 72'12'24"; THENCE S 87o55'5 I" W 59.98 FEET; THENCE N 68'43't 6" W 31.64 FEET TO POINT "A"; THENCE S 85'13'4 1" W 76.82 FEET TO THE TERMINUS OF TIES CENTERLTNE DESCRIPTION; TOGETHER T14AT PORTION OF SAID NORTHEAST QUARTER OF SECTION 26, BEING A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINF; BEGINNING AT SAID POINT "A" THENCE N OOo4O'O9" W 23.40 FEET TO THE TERMINUS OF THIS CENTERLINE DESCRIPTION; SAID EASEMENT SHALL EXCLUDE ANY EXISTING BUILDING STRUCTURES, NOT INCLUDING SCREENING FOR ELECTRICAL EQUIPMENT, T14E SAID LINES OF SAID EASEMENT TO BE EXTENDED AND SHORTENED AT INTERSECTIONS WITH BOUNDARIES OR CHANGES IN DIRECTION TO TERMINATE ON THE BOUNDARY LINE OR ON ADJOINING SIDE LINES. TOGETHER WITH: AN ACCESS EASEMENT OVER AND ACROSS ALL ROADWAYS AND PARIUNG ACCESS AREAS WITHIN THE LIMITS OF SAID PROPERTY AS NECESSARY TO OPERATE, REPAIR, REPLACE AND MAINTAIN THE SEWER FACILITIES DESCRIBED IN SAID UTrLITY EASEMENT. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. See attached Exhibit "A" TTEE CITY agrees to restore to substantially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shall not construct any future permanent structure over, upon, or within the permanent easement. DATED THIS 'I DAY OF 64::!�� 20 11 STATE OF WASH][NGTON) )SS COUNTY OF SNOHOMISH) I certify that I know or have satisfactory evidence that L 14,, // — is the person who appeared before me, and said person acknowledged that (he/she) signed this instrument, on oath stated that (he/Lhe) was authorized to execute the instrument and acknowledged it as the of 3' Avenue Condominium Association to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated ...... ........ 7.-.// ..... .. ... .. . ........ . (Signature) (Seal or stamp) ............... ... ... .............. ........ Title 41 r��'t 1� My appointment expires .... 4 A PORTION OF SEC 26, TWP 27 N, RGE 3 E, W. M. IN SNOHOMISH COUNTY, WA. EX. BLDG #434 MANHOLE OVERFLOW NOTE: PERMANENT SEWER -STORAGE VAULT EASEMENT IS 20 FEET IN WIDTH, CENTERED ON S 8 5'13'41 " W CENTERLINE OF CITY'S 76.82' OVERFLOW STORAGE VAULT, WET WELL, VALUE VAULT, WET WELL 0*40'09" FORCE MAIN, MANHOLES, ETC, I" "A 23.40' UNLESS EASEMENT CONFLICTS POINT - WITH BUILDINGS (OTHER THAN VALVE VAULT CONTROL CONTROL SHELTER). IN THOSE SHELTER INSTANCES WHERE CONFLICTS Ot - OCCUR, DIMENSIONS ARE SHOWN. DIMENSIONS SHOWN 9.5' IN 68'43 1 16" 7W —7,31 ARE TO THE NEAREST 0.5'. 6 4' WHERE DIMENSIONS CONFLICT WITH LEGAL DESCRIPTION, THE LEGAL DESCRIPTION U-) SHALL TAKE PRECEDENCE- EX- BLDG #432 u') 72"12'24" S 87*55'51 W L 25.21' — 5 8.9 8' R 20.00' 7. 2 — CENTERLINEMOF 2 0 FORCE AI 't\ \-IN 19*,51'45 — L44� 1 1J EX. BLDG #428 6 4'19'5 JJ. U 0 LL RL'3)a) 2000 R 3 0. 0' IN 84'11'39"7W 173.16' [N� 73-19'03" W1 134.47'F— POINT OF —9. 5' 24 50 25 0 50 BEGINNING—""� 3RD AVENUE S SCALE IN FEET 12-507SE11-RED ROAD SVfT-' 101 Scale EXHIBIT "A" N SEUEVUE. WA 98005-25DO 1"=50' CHS EMGINEERS, L LC Tat425)07-J69J FAXf4267637�M94 CITY OF EDMONDS ic Sheet 0 LIFT STATION #5 E SEWER EASEMENT Drown by Project # 450901 Checked by DF Date 03/29/11 CONFORMED COPY J�1105180542 2 PGS 11912011 4:15�m , �63.00 SNOHOMISH COUNT ASHINGTON Return Address: City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 ACCESS AND UTILITY EASEMENT Property Address: 428, 430, 432, 434 3rd Ave S., Edmonds, Washington 98020 NOEXCISE TAX REQUIRED MAY 1. 8 2011 v, ,,iRKE SIEVRS, 611011008*9 COMY freasuret K�RKE 0-f_V.ERS, Assessor's Property Tax Parcel Nos.: 00799000110100, 00799000110200, 00799000110300, 00799000110400, 00799000110500, 00799000120100, 00799000120200, 00799000120300, 00799000120400, 00799000120500, 00799000210100, 00799000210200, 00799000210300, 00799000210400, 00799000210500, 00799000210600, 00799000220100, 00799000220200, 00799000220300, 00799000220400, 00799000220500, 00799000220600, 00799000310100, 00799000310200, 00799000310300, 00799000320100, 00799000320200, 00799000320300, 00799000320400 IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, P Avenue Condominium Association, hereby grant to the CITY OF EDMONDS, a Municipal Corporation, a permanent easement for the installation, construction, operation, maintenance, repair, reconstruction or replacement of a sanitary sewer lift station and appurtenances, over, across, through, and below the -following described property, and the further right to remove trees, bushes, undergrowth and other obstructions interfering with the location, construction, operation, maintenance, repair, reconstruction or replacement of said sanitary sewer lift station and aRRurtenanc , together with the right of access to the easement at any time for the stated purpose. The easement hereby granted is more particularly described as follows: A UTILITY EASEMENT OVER, UNDER AND ACROSS THAT PORTION OF THE NORTHEAST QUARTER OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, WM, SNOHOMISH COUNTY, WASHINGTON BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED AS -CONSTRUCTED CENTERLINE OF THE LIFT STATION WET WELL, FORCE MAIN, VALVE VAULT, OVERFLOW STORAGE VAULT, ELECTRICAL CONDUITS AND ENCLOSURES; COMMENCING AT THE SOUTHEAST LOT CORNER OF THIRD AVENUE CONDOMINIUM, AS RECORDED UNDER RECORDING NUMBER 9110315001, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. THENCE NORTH ALONG THE EAST PROPERTY LINE N 00038'39" W 10.57 FEET TO THE TRUE POINT OF BEGINNING; THENCE N 73019'03" W 34.47 FEET; THENCE N 84011'39" W 73.16 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 33.68 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE RIGHT, HAVING A RADIUS OF 30.00 FEET, THROUGH A CENTRAL ANGLE OF 64-19'54"; THENCE N t905 1'45" W 44.11 FEET TO A POINT OF CURVATURE; THENCE NORTHWESTERLY 25.21 FEET, ALONG THE ARC OF A TANGENT CURVE TO THE LEFT, HAVING A RADIUS OF 20.00 FEET, THROUGH A CENTRAL ANGLE OF 72-12'24"; THENCE S 87'55'5 1 " W 5 8.98 FEET, THENCE N1 68043'16" W 31.64 FEET TO POINT "A"; THENCE S 85"1 Y4 t " W 76.82 FEET TO THE TERMINUS OF THIS CENTERLTNE DESCRIEPTION; TOGETHER THAT PORTION OF SAID NORTHEAST QUARTER OF SECTION 26, BEING A STRIP OF LAND TWENTY (20.00) FEET IN WIDTH LYING TEN (10.00) FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE; BEGINNING AT SAID POINT "A" THENCE N 00"40'09" W 23.40 FEET TO THE TERMINUS OF THIS CENTERLINE DESCRIPTION; SAID EASEMENT SHALL EXCLUDE ANY EXISTING BUILDING STRUCTURES, NOT INCLUDING SCREENING FOR ELECTRICAL EQUIPMENT. THE SAID LINES OF SAID EASEMENT TO BE EXTENDED AND SHORTENED AT INTERSECTIONS WITH BOUNDARIES OR CHANGES IN DIRECTION TO TERMINATE ON THE BOUNDARY LINE OR ON ADJOINING SIDE LINES. TOGETHER WITH: AN ACCESS EASEMENT OVER AND ACROSS ALL ROADWAYS AND PARKING ACCESS AREAS WITHIN THE LIMITS OF SAID PROPERTY AS NECESSARY TO OPERATE, REPAIR, REPLACE AND MAINTAIN THE SEWER FACILITIES DESCRIBED IN SAID UTILITY EASEMENT. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. See attached Exhibit "A" THE CITY agrees to restore to substLtially the original condition such improvements as are disturbed during the construction, maintenance, and repair of said utility or utilities, provided the grantors, their heirs, or assigns shah not construct any future permanent structure over, upon, or within the permanent easement. DATED THIS -7 DAY OF 6 20 P STATE OF WASHINGTON) )SS COUNTY OF SNOHOARSH) I certify that I know or have satisfactory evidence that is the ��Lall7l& L person who appeared before me, and said person acknowledged that (he/she) signed this instrument, on oath stated that (he/tej was authorized to execute the instrument and acknowledged it as the of 3' Avenue Condominium Association to be the free and voluntary act of such party for the uses and purposes mentioned in the instrument. Dated ..... ....... . . . . . . . . . . . . . . . (Signature) (Seal or stamp) ................... ...... ........ Z Title Myappointment expires ... ........ . / . I.. A PCLO-1 Zone� (K_pA q Corner��Flag_L P:) VED LANNING Let —backs Re u- d Actual Front .77 ,-1 7 i4—tA Sides .7 Rear ep Re) S 01, Other 112ight Tl-,� 4e;, IAV 6L, 119.0 M) EL fp. --77- 3 L v 91:5- )W\I. zjr7,.4 ZZ 18312:21miza: 22:221:2. Lai Y. M) 1A. Vr- -rd::PF:l Ze--7 Q6 Ji r -,7 YA m—t:::> r YA j w JUN 2011 E- E-T M,,E- - 4-� CITY..,C-F EDf-ACNIDS "M LLJ PE C/) 17. 7AL�'? 7-1 D,1-1 t�T ZZ,3 3A(e 71 lll� /-/-L/ Z,� z---7- a,Z 714iE zf-)A.// T-5 7 O-Oe 04,Y5 6��Vtog 11-41411L1 t5vell(14:, 44- '70 --51 2 4'at zv,,:5,ot"-7 ��725- 21 ID91�1 13400 1660 57 ov�= lo, 00. 4 5:, 7 -1 WdLer head Per 100 ft. of pipe 31- . . 11/2# 20 1� I Z�zs �v 3# 0 yv.l �j 21/2- 3 11,411:1 1`111, 11.,w Vl L4U 2.10 1 47 1.20 89 12.7 2.41 0. 4 4.23 3-29 1.49 1.01 .86 .27 .63 12 fl. 31 26.0 3.61 6.91 2-23 2-14 1.29 S7 ." :26 x- 8.45 46.1 4.82 11.0 2.98 1.68 1.72 -95 1.26 .57 .09 IU-6 69.1 6.02 17.9 3.72 5.50 .45 .77 .16 .52 .05 2.14 1.44 1.57 .67 .96 .24 .65 .08 .43 .0) 12 7.22 24.9 4.46 7.71 2.57 2.U2 I.og .94 ---------------- Z-� 15 9.02 37.6 5.60 11.8 I -IS .37 .78 .11 A2 .05 ' a 10.8 50.9 )-21 3.05 2-36 1.41 1.50 .51 17 .61 20 3' PIPE' 12.0 63.9 , 6.69 16.5 3.86 4.2o 2.gj I.W 1.72 .70 .07 .49 .03 -2.1 7.44 19.7 4.250 5.21 3.15 2 44 I.ol :18 :24 .7b .10 .58 .66 1.31 .04 30 _' .49 .02 9 10 30-1 5.36 7.80 3.80 3 43 2.50 .3V .87 .12 .6S .05 .51 35 .57 .03 ]LIS 41.8 6.43 10.8 1. .2 0' 1.63 .41 1.09 .03 4.72 S-17 -2.89 1 go 1.96 .06 .64 5S-� 7.51 14.7 5.31 6.91 3.3S - .61 1.30 .18 '81 .04 40 .6, .04 2.40 LIS .81 1.52 .2S .97 .11 .77 o6 .73 .04 PI PE 14-88 71.4 8-58 18.8 6.30 8.83 1.8? 2.68 16.70 9.65 23-5 7.08 IU 9 1.03 1.74 .41 1.30 SO .82 -05 .57 .01 10.72 28.2 7.87 13:3 4 3.02 1.32 1.95 .54 1.46. .19 - 1.02 Ao 55 -90 .06 .62 .02 .78 4.61- 3.35 .24 1.15 .13 .1,0 .98 11 78 33.8 - 1-56 2.17 .6S 1.62 .29 1 28 .16 .07 66 .03 12' 8-66 16-0 '5 26 5,51 3.69 1-88 2.39 .74 1.70 65 1 .87 40-0 9.44 15.6 5.74- 6 S3' '4 '01 2.19 1.60 .34 1:41 .19 1-06 .09 :74 .04 13 92 46.7 10.23 21.6 '90 -40 1.33 .21 70 1.14 .10 .79 .04 6-21 7. 4.36 2.51 2.82 1.02 2.00 .47 1.66 .25 75 1.22 .1 1 .85 .05 15-01 S)-I 11 .02 24.9 6.69 8-64 4.69 2.91 3.04 1.21 A 80 1.31 -113 16-Ub 60.6 11-80 28-1 7,17 1.27 -54 1.79 .30 .91 .05 17-16 68.2 9-82 5-0) 3.33 3.2S 1.41 2.32 .60 1.91 85 1 39 . S .96 .06 12.69 32.0 7.65 11.1 5-36 3-71 3.49 1.54 2.60 .69 2.oq .34 90 1.47 .16 I.o2 18-21 77.0 13-38 M-3 8.13 12-5 5.70 3 .38 .07 19-30 84.6 14-71 39.5 8.61 .81 3.69 1 66 2.62 �76 2.17' .42 95 1.55 .18 1.08 .07 13.8 603 4-61 3.91 1 ' IOU 1 *63 .19 1.13 _08 14-95 43.7 15 2.30 .47 6 2.42 .53 110 1 79 .23 1.25 .10 15-74 47.9 9.16 16.8 670 5-64 4.34 2.33 3,25 1.03 I.SS .57 120 1 96 .27 1:36 .11 8, PIPE 17-31 57.3 10.5 2U.2 7:37 , 6.81 4.77 2.81 130 2 12 -31 1.47 18-89 67.2 11-5 23.5 3.57 LIS 2.81 .69 2 . 3 8.04 7.89 5.21 3.29 3.99 1.45 3.06 .80 140 2 9 .36 1. �q .15 .90 .04 20-46 78.0 12.4 27.3 8.71 8.79 S-64 3.81 4.22 1-68 3.31 .93 150 2 45 -41 1.70 .17 .96 :(4 22.04 89.3 13.4 N-5 9 R 10.5 6.08 4.32 4.54 160 2.61 23.6 14.3 35.7 10:00 1.93 3.57 1.07 1-80 .19 1.02 -05 12.0 6.51 49) 4.87 2.19 182 1.23 17U 2.77 -51 1.92 ua .05 15.3 40.4 10.7 13.6 6.94 5:54 5.19 2.47 4.06 1.37 180 2-94 .57 2.04 '2'4' 11' 16.3 45.1 .15 o6 11 4 16.0 736 6.25 5.52 2.75 433 1.51 190 3.10 .63 2A6 26 1.21 17.2 50.3 12.1 200 3.27 - .07 10' PIPE - 16*8 7-81 6.58 .70 2.27 .29 1.28 .07 18-2 55.5 12:7 18.6 3-63 3.07 4.60 1.70 220 3.59 .8-3 2 44 34 1 40 og 8.24 7.28 6.17 3.39 .90 19.1 60.6' 4.84 1.88 .01 21.0 72 4 13.4 20.3 B-68 8.36 6.50 3.73 5.11 24- - 2.06 0 3.92 .98 2.67 .4 14.7 24.9 9-55 10-0 7.14 4.45 1 2.44 260 4.25 1.13 2.89 1 1-53 -10 .96 .03 22.9 83.S .47 1-66 .12 1.06 D4 16.1 28.7 10.4 11.8 7.79 3.22 6.13 2.91 280 4-50 1-30 3.11 24.9 99.2 17.4 33.0 11.3 13.7 8.44 6.07 300 4.9U -54 1.79 .13 1 13 .04 1.48 3.33 62 1.91 6.64 3.28 .21 .01 2 15.7 9.09 6.95 7.15 3-bS 5.13 1.66 1.56 :69 2.05 .17 1 31 20.1 43.2 320 IS 1 18-8 38.1 12. 340 3.44 1.87 3.78 76 2.18 .19 1�3 .06 21.6 48.4 13.0 17.9 9.74 7-90 7,66 4.37 So -07 12' PIPE 13.9 20.1 lo.40 8-88 8.17 .4-93 360 5.77 2.07 4.00 116 2.9 54-5 14.8 22.S Ij 00 996 380 6.19 2.28 4.11 2-30 -21 1.47 .07 8.58 3.50 QU 6.44 2.5 4 :5�4 2-43 .24 1.55 .08 1.08 .01 24-2 60.2 15.6 24.9 11.70 11.0 9AO 6AS .43 1 01 2.60 .25 1.63 25.6 66.7 16.5 27.7 12 . 2.92 .3 12.2' 9,59 6.58 4SO 7.20 3.1 5.00 1:29 -09 1.14 .04 26.8 73.3 17.4 30-6 13-0 13.4 10-10 7.Sl 500 8-02 3.8 5.S6 1 .32 1.81 .11 1.28 .05 550 8-82 4.5 -36 3.19 .39 2.04 .13 1.42 .05 19-5 36.7 13.9 16.7 11-49 9.)l 6-11 1.86 3.12 .46 2.1-4 .16 I.S6 .06 21.7 46.1 ------------------ :_1 16.2 20.) 12.6 11.3 tADO 9.62 5.3 6.65 2.19 3.85 23.9 Lk n 1'. 13.0 13.5 650 10.40 .54 2.43 1-70 .07 6.2 7.22 2.53 4.16 .63 2.65 " 26.0 - 700 11.2 7.1 7.78 2.92 :21 1.84 .09 64.4 19.5 28.5 15.10 1S.8 750 12.0 8-1 634 3.3 4.46 .72 2.86 .24 I.W .10 28.2 21-1 33.0 16.40 18.3 800 12.8 S 4.80 - .82 3.06 .2h 2.13 .11 22.7 37.9 17.60 2J.) 9-1 8-90 3.74 J�JO .89 3.26 .31 2.27 .13 24.4 41.0 18-90 24.0 850 13.6 10 2 9 45 4.21 5.48 1-01 3.47 -35 2.4 ' 1 .15 26.0 48.4 20-20 26.8 900 14.4 11.3 10.0 4mb 5.75 1.16 3.67 .39 2 27.6 M-1 21.4 30.1 U 950 15-2 12-S 10-5 5.26 .56 .16 )00 16.0 13.7 11.1 6.06 J.35 3.88 T .43 2.70 .18 22.7 3) 4 IIOU 17.6 5 6.38 1.40 4.06 .48 2.84 .19 16.4 12.2 6:84 7:03 1.65 4.49 -56 3.13 .23 1200 19-61 19.2 13.3 8-04 7.66 1.96 4.90 -66 3.41 .27 I " 20.8 14.4 8.6 8 5.31 8­30- _212 .76 3.69 .31 1400 22.4 15.6 10.6 8.95 2.59 5. 1300 24.0 16.7 12.0 71 .88 3.98 .37 9-58 2.91 6.12 LOO 4.26 .42 1600 2�.6 17.8 12.6 10-21 3.29 6.53 1.12 4.55 .46 1800 20.0 11-50 4.13 7.35 2000 22.2 139 5-11 .57 2200 24 4 12.78 5.03 8.16 1.69 5.68 .70 1 4.05 6.00 8.98 1.99 6.2S .8% 2600 15-32 6.7 9.80 2.31 o.aj .98 28ou 10.61 2.73 7.38 1.14 -low 11.41 3.15 7.95 1.29 320U 12.24 3.58 8.52 1.48 3500 13-05 3.7 9.10 1.65 30 4.74 9.95 1.96 4200 15-51 6.3 10-80 2.30 - ------- 4SW 11.92 2.76 5wu 12-78 3.24 Im 14-20 3.95 60OU osdl .1r, sk DLIPLEX HYDR-0-GRIND HYDR-0-RAIL PACKAGED SYSTEM SPECIFICATIONS GENERAL Furnish and install a complete pumping system as manufactured by HYDR-0-MATIC Pumps, Ashland, Ohio. System shall Include two sewage grinder pufpp, three 3900 mercury switch level controls. discharge plumbing with hydraulically sealed discharge flange, pump mounting plates with bottom rail supports. upper rail suppons,. liffing chain, pedestal mount and cord sealing plate for panel or NEMA IV junction box; to be lnqtallod In factory fabricated basin with cover or on -site concrete basin. A NEMA IIIR weatherproof control box shall be supplied- for- mounting at the sump site or remote from the basin as reQuired. Structure and dimensions to be as shown on drawing sheet .1 of 1 OPERATING CONDITIONS Each pump -shall have a capacity. of gpm againsta total head of 1170 feet. Pump motor shall be hp. 1 phase. 2-10 volts, 54�20 rpm, cycle. Pump performance - shall - be- as showyn on curve 4 9 (J Separate specification for pump and motor. SUMP LEVEL CONTROLS Sealed float type mercury switches phall be supplied to control sump level and alarm signal, If furnished. The mercury tube switches shall be sealed In a solid polyurethane float for corrosion and shock resistance. The support wl ' re shall have a heavy Neoprene jacket. A weight shall be attached to cord above the float to hold switch In place in sump. Weight shall W.above the float to eflectively prevent sharp bonds In the cord when the float operates. The float switches shall hang In the sump supported only by the cord. Three float switches shall be used to control level. One for pump turn -on, one for pump turn-olt, and one for both pumps turn - on. A fourth switch shall be provided If with alarm. Float switches shall be Model No. 3900. OPTIONAL Alarm light (or bell or horn) to be supplied In separate NEMA III enclosure for mounting at the control box or remote from box. or alarm light mounted on panel enclosure (200,230 volt only). Alarm bell or horn shall hava'sllon6lng switch wIth'sutornatic (east. —Alarm Llgl�t Model No. Alarm Bell. Model No. -Alarm Horn Model No. Std - Alarm light mounted on panel enclosure OPERATION OF SYSTEM On sump level rise lower mercury awl tch shall first bo'energized,. then upper level switch shall next energize and start load pump. With lead pump operating, sump level shall lower to low #wilch,'. turn-off setting and pump shall stop. Alternating relay shall Index on stopping of pump to that lag pump will start an next operation. It sump level continues to rise when lead pump Is operating. override switch shall energize and start lag pump. Both load and lag pump shall operate together until low level switch turns off both pumps. If level continues to r1se when both pumps are operating, alarm switch shall energize and signal the alarm, whore used. It one pump should fall for any reason, the second pump shall operate on the override control and It level raes above ovorrldo control, alarm shall signal, where used. All level switches shall be adjustable for level boiling, from the surface.. ELECTRICAL CONTROL PANEL Control panel shall have a NEMA IIIR weatherproof enclosure. A lock hasp shall be provided on door. A circuit breaker shall be provided for each pump pnd a magnetic startor with 3 lag overload protection for throe phase operation. or I log overload protection' for single phase operation. shall be supplied for each pump. An alternating relay shall be -provided to alternate pumps on each successive cycle of operation. Startora shall have auxiliary contact to operate both pumps on ovorrido condition. An Interlock relay shall be provided to automatically re -connect -the control circuit In case of circuit breaker trip on one pump. H-O-A switches and run lights shall be supplied for each pump. Terminal strip shall be provided for connecting pump and control wires. Additional terminals shall be provided to connect alarm. A-transformor shall be supplied to give 24 volt control circuit. Panel Model No. IlL listed. Panel shall have relay with dry controls for alarm,telem. connection. CHECK VALVE & PIPING The discharge piping shall Include a HYDR-O-MATIC ball check, valve with hydraulically sealed discharge flange and a gate valve for each pump. Discharge from elation shall be filled with two NPT couplings. All piping external to the station shall be furnished and Installed by the contractor. SUMP BASIN Thu factory fabricated basin, whore furnished, shall have an Inside diameter of toot and ---=— Inches,, and o. Oolght of toot and Inches. Tho'ba6in cover shall be Inches 0.0. and — Inch thick. Basin, If stool. and cover shall be sandbla4lad Inside and outside to remove scale, *14g, rust. etc., before pointing. basin, It stool, shall be cooled Inside and outside with tar base epoxy Wnt for cor- rosionreal6tance. See plans, HYDR-O-MATIC Pumps RESERVES THE RIGHT TO CHANGE SPECIFICATIONS OF MATERIALS USED IN ITS PRODUCTS WITHOUT NOTIFICATION. HYDRaDeMPTIC... PUMPS' A Division of Wylain, Inc. Wf Post Office box 327.41WM MR Cisromant 4 Daney Roade, Ashland, Ohio 4405 Gone" — Wyisin C4naft LIC LW, Us 111MI 01. lI1rW#k^ Qnbft WT I=' in6Wn4UWW1 "of — Adtlnr4 Ohio TWep 001443 L- m ON ENE 0 m EMMOMMEMEN ME mommomommammom SM mmommom ME ON ME ON MMI ME ME ME MEMEMEMEMEMEMMEMMOM 0 Most trouble -free control ever designed... Bulle.11n.710.1 C C..' FOR USE IN SEWAGE AND PRACTICALLY ALL CHEMICAL SOLUTIONS! kTENT PENDING ON POSITION OFF POSITION 900 MERCURY ,SWITCH LEVEL CONTROL VENTED CORDS DIAPHRAGMS N MECHANICAL SWITCHES 0 CLAMPS IN SUPPORT RODS ENO HOLLOW FLOATS Mercury tube switch is sealed In solid poly- urethane float. Weight outside float holds switch at any de- sired height in sump. Designed for over one million cycles of oper- ation. Solid polyurethane float makes switch leak- proof and shockproof. . 39oo REPLACES ... ROD TYPE FLOAT SWITCHES, DIAPHRAGM SWITCHES, AIR BUBBLER SYSTEMS... INSTALL AND FORGET! HYDRaDoM C PUMPS SEP-13-19-0 THU 15,121, 'SEP H I 13H-- TECH TEL 1,ri, 2-06- #304 P01 MU:T Fil E "T.. H 4-mq C4AROWN-REWAMT COATMOS WAGSHR HIGH-Tzcs COATINGS, 11c. PiCSIMILB TRANOMITTAL rAxi (206) 850-3099 Iwo ADDRE1983 q4 't, L TMAL NUMBER OF PAGES (INCLUDING TBIS,C,OVER SEMET) 4----- REPLY M UESTEDs YEG. BY PAX YES, or PHONE NO MESSAM .00418. 920 &M #103 KPA W"W4W MW M &"987 SEP-13­'90 7'HJ 15-12 jj)i�,��SSE:p HT 71ECj," TEL ND: 3716­350--,'�1%7 #-Tj4 P02 Y VIVI"UE:FkMIF_F;tFF SEATTLE'& LARGEST SMAGE PROJECT' 1968 also," 'i-, Y":4 -25' *fT C-CONSEAL AVERAGE 1"EMPERATURE , 34 deg. F SEP-13-1 90 TH-1 15:13 �iSESER HIGH-TECH TEL �,O: 2,96-P-504-q67 #304 P03 Wasser MC-ConSwal D E * Single-oomponent, moisture-cu ring, high solids urathane coating A 0 Chemical and suffide-resistant concrete coating I P T Cold, darnp application tolerant coating I 0 High sailds, VOO compliant coating Is Sealer for interior of new concrete sewer pipe, manways, or vaults. U W Ohamlca,' and sulfide -resistant protective coating for concrete S and metal . Surface4olerant coating for darnp or poorly prepared surfaces Is Mixed with aggregate as sealer for stress cracks * Single component - no catalyst mixing errors 0 Can be applied in cold, damp conditlons - at humlditles to 99% A D Can be applied at low temperatures - to below treezing v A v Typical urethane abrasion resistance and all-around N performance In harsh onvIronments T A a ',:*64da.st range of wet chemical resistance E Supoor adhesion to concretes and most surfaces easl� re paired VOO Oompliant SEP-13-'50 TKJ 15;14 1 L4��R HIGH-TECH TEL NO;2005-,A50-Z #,M4 PO4 Gaikk by VOLIMO: 52.0;t 1.()% T MOW; O's 10,11 ft C VOO: I= ftn 3.5 RWQaI W CZVKW at 2.0 MHz DIFT: 424 tF1Q11 N RuiWaNifty: Anytime Liter 2.4 hour Fninimum, and bafors 24 hours I TerMerature resistary-e: 2850 F continuous A Fluh PoIrd: Abovs 830 F L Cure t1mm., MWmm 2.4 hours for teeacut or Nght traffic. C,ure times vary with tempGratura and 0 humlft� A Cherrikea! resistance; pH 2-12, 1-128, HSO,, most aWs and bases, and most Wveft T Shelf Ide; 4 months from date of shipment, In unoponed o6ginal containors *UwW at A ton"rawres below W F P R All ourfaces must be *loan and Iree of any gmase, dirt or exceselve ahalking. 8 a U P On corwate and MNI, use SwSeporbrush oft blast. 0(tv,10 ethon concrete. R A IN a A A On Owk,%, fibergloss, acrylic, or gelooat, sand 4htly and wipeAh solvent. 0 T NoW. MO-CoMSO&I *111 adhm W nearly any svda= even wkhmt pmper surtwo plIMM- E I Mm. 4 4 tMemni of amp, risled, OwAy surimm'. Oowev@r, g000 prv000 dl%dies fftwing tm &bm pmpmllon when po&*I*. A UN MC-TMMOr Oft P Use sm, roller, or Crush. F in miost c=m aM�/ a slrqe coal of 1.5-2.0 mils DFT, Allow mIn1rnurn Z-hour cure between L I Goam. 0 Can be mitted with mWagate and SOWbOd IMO MOSS CMCM A 'at T As an acid or sulkle resistant coating on ooncrele',. apply WO 003ts- -1.0. mlis OFT- per coat. I This Ming can be wetted or Immersed In as little aB 1-2 houm, me: WUM Mo Wetwesmay be applim! to dWP Surfam &I IS h humWit . AYW applizdam mr oWbus ww drop or WWIv* of waw. AwW dppbV x dwnp or wu"tbrulif or roller bl Into ft padnt mp'wawdy for 62 (*4*ds Of On* vv*` I"O"mobill `*? i� IhO Pfitt am, Eve* This product Is lor hWstftl use only, WARNING: VaMr and Way rnW, am hanM. Consult the rrimertal safety data sheet. Use an approved nwomtor In cordined mas when brushing or rolling. Use a positive pressure ak flow rf hDW wMn eMwad to spray mist or overspray. Protect skIn and syps from contact, This Y product uoritalris organic solvents aM polylsacyanate&' Do not use I you have 3 chronic or H WIOMIO mactloft to Mocyanales or organlo. Wvants. fttab H1040;h Coo= Wwanto Its W*A10 W be fr" WM 46*% In MIN Md Wor"IrOMP, VVWW fth-tom c4MWV,5 Gale dftaftn &-A RUWA G=hWw Mwe4 In Wftetlon Will 0% podu= shali be *nW, at W*uW 141g�Toah 00fithpla option. ID oow W Arty W Mmuft*# Na WwwiVnvA1 be made I;ySuyerw Wwant.Hlg�,Tock�iCoadnpinvtO.ftw6iftn h% (8) daysal"eadlecavMof ftdc'md A d*W. but In ro ~4 �%w dwn ft expkuWm of the wplkr.09 "19%. at alx rr4nft trom the "�Voq dam. whIchow IQ Ouller. sween R Idim to r** Wawr 4iatrT60 CoWnp of v;en non-wfumvve so mq*ed hareir shall bar B4@r Irm rownvy urder thIs Wwmnly. R WMW HVI-Tow Ongnp Mom no ww Ww(arUt WflWrMAD MO pledum. N6051of W2"Wd", Wholsof expW6, IMP4419"Or Atlawtoey, A ouch = wamnfies of mardwinbUlty of Omma bt a pw4Uar pvopw, 0*1 ". In r* ov,,on OW1 %%44of coaorvo 0� liwd tv awas*mW or InddsnW dmagazz Any mmmnadolon or zu"ution WOV b tw uee of ft prW= made by Wwan# fti-Tech Ctalngt, Whwhor In In wahfta 1wature. T oe in mopomm ID epWflo ln*dfy, w &a bmaod on 4ma We to he r*Pame- h&wavee, the prodam &-A tmfivwft&*)m &* Intandod for Y un kW BWws haft fteWslia *WD " know-lvw In Ov InMrv, w4 thwelve It Is ir Bum 0 uWaly IOW of theadmWIty of Me amdom for Its am paftAw use and it Ag in dmff*O- Mai "t hw dona 4*, at lis coo d%credom arA rWL VarlaWn orwlmnn"� duuVm In F"whim of V", or MMWOWARn of dain rMy C&Ae UMMOMMY F"VITO, UWr OF UARILM - Wamli HaWlIty an any cialm of" �Ird Wvft 04w4 b*W vw W&*Ws 1oQIIWnft at &M ileSlity, fol any Iaw w dwmp cWM cutol, wnvcbd whh, of mvAno frm ft tm of ft wWuatk Mali In no mo exxod ft pwzhae pem Le W-A 11--e 0 to CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works o Planning * Parks and Recreation o Engineering � 8 9 0 . 1 99 - May 14, 1991 STREE"'"I" FiLLEE Bjorn Thuesen Bjorn Thuesen, Inc. Realtors 322 Main St. Edmonds, WA 98020 Re: City Park Condominiums, 430-434 3rd Ave. S. Engineering Inspection Dear Bjorn, LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR s-Iq On May 10, 1991, an engineering inspection was conducted at the subject project site. Listed below are the deficiencies noted: 1) Parking stall width in front of building "B" not to City standards. 2) Two (2) parking stalls behind and one (1) to the west of building "A" not to City standards. 3) Drain plug at base of stairs to garage, building "A", plugged. 4) Clean asphalt off of all manhole and utility covers. 5) Clean out sewer manholes. 6) Install locking nuts on manhole covers. 7) Grout around pipes in valve vault. 8) Grout all catch basin and manhole concretee extension rings. 9) Clean out debris from oil separator. 10) Downspout on south side of building "B" not connected to tight line. 11) Downspout at southwest corner of garage to building "C" not connected to tight line. 12) Install splash blocks at all downspouts around building "C", which is not connected to tight line. o Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan Bjorn Thuesen May 14, 1991 Page 2 13) Secure chain link fence to posts. 14) Provide exterior lockable latch to gate at lift station panel enclosure. 15) Enclosure around lift station panel not wide enough. 16) Lift station and system not tested. 17) As -built drawings required. 18) Clean out all catch basins. 19) Lift station telemetry not installed. 20) Repair defective areas of asphalt paving in front of building "A". 21) Parking stalls south of building "B" and building "C" garage (next to concrete retaining wall) not to City standards. Because the olef station and associated equipment have not been tested to date, a separate punch list may be required. The test on the lift station, scheduled for this morning, is only a partial test and is not to be construed as a final test or acceptance of the system. After the telemetry is in place, a complete test will be conducted on the lift station. Before we will consider any additional occupancies, the lift station must be totally operational. We feel that four (4) weeks from today is sufficient time to get the system completed. If you have any questions, please call me. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt CITYPARK.APT/TXTST530 6zJ C�'_ Al btrts FILE M E M 0 R A N D U M May 10, 1991 TO: Mayor Larry S. Naughten FROM: Gordie Hyde, Engineering Coordinator VIA: Bob Alberts, "frtngineer SUBJECT: THUESEN LETTERS OF 10-23-90 and 12-18-90 The first letter, requesting street lights, has been forwarded to Bill Stroud, Street Supervisor, as he is responsible for ordering street lights if necessary. The second letter dealt with a request to prune maple trees at the City park. Pat Harris, Park Maintenance Supervisor, had indicated a willingness to work with Mr. Thuesen's subcontractor to trim the trees, which is Mr. Thuesen's responsibility. Apparently, Mr. Thuesen's subcontractor has not responded to Pat Harris for coordination of the effort. GCH/sdt THUSNLTR/TXTST530 CITY OF EDMONDS 250 - 5TH AVE IN EDMONDS, WA 98020 (206) 771-3202 COMMUNITY SERVICES: Public Works * Planning - Parks and Recreation Engineering T " !,� &-.,..T FILE May 1, 1991 Bjorn Thuesen President Bjorn Thuesen Inc. 322 Main Street Edmonds, WA 98020 Re: Temporary Occupancy request of April 25. Mr. Thuesen: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR I agree that you have made repeated requests for temporary occupancy of your building at 428-434 3rd Avenue South (City Park Condominiums) and that we have refused each time. Each time I explained the project was not sufficiently complete to consider a temporary occupancy. You do not seem to fully understand what our policy is. Let me explain. My staff agrees that our current policies have not changed regarding inspections and occupancy in the past 10 or 15 years. My staff tells me you have been though the process a number of times in the past and do not understand your confusion. That policy is as follows. 1. Once a request is made for "Final Inspection" or "Permission to Occupy" the departments involved in the permitting process are notified (the building department is last to inspect). Each department must grant approval before a Certificate of occupancy is granted. The building department inspection is usually not scheduled until the other departments have conducted their inspection and have approved. 2. If a request is made for "Temporary Occupancy" the same process is followed by my department. If each reviewing department is willing to release (with or without conditions) , the building official may issue a Temporary Occupancy for a limited period and with specific conditions. So if all reviewing departments agree to a temporary occupancy the building official may issue a temporary pursuant to Section 307(d) of the Uniform Building Code (UBC) . It should be noted that the UBC is a model code and allows for local interpretation. Section 307(d) is not a mandate but offers a method of granting a temporary when justified - thus the use of the word MAY in the text. o Incorporated August 11, 1890 0 Sister Cities International — Helkinan, Japan 0 0 In your particular case, the reviewing departments have not granted permission to issue a temporary occupancy. Engineering and Planning have reported that too much work remains to be completed to consider a temporary. For that reason the building department has not scheduled its final inspection and has yet to determine if the building's life safety requirements have been met. Again, I believe the policy is the same as it has always been. I cannot agree to the issuance of a Temporary Occupancy until each reviewing department agrees to allow that do be done. I hope this will clarify the situation at City Park Condominiums. ncdre Richard R. Mumma CBO Building Official City of Edmonds cc: Sharon Nolanf Rob Chave, Pla Tom VonSchuess Gordie Hyde, En Ron Holland,, Wa thuesen.rrm it Coordinator ing Manager r, Fire Marshal ineering Department-'— er Department 0 0 CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works o Planning a Parks and Recreation o Engineering , 890 . 19 4 January 4, 1991 Bjorn Thuesen 322 Main St. Edmonds, WA. 98020 Dear Bjorn, STR!�-" FILE 9E/ -,? / -�;- LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR �9�J I /V / 7 � In response to your letter of December 18, 1990, 1 cannot authorize the lowering of the park access road adjacent to 430 - 3rd Ave. S. The proposal, as I understand it, would have to be approved by the Parks and Recreation Division, Arvilla Ohlde, Manager. My impression is that changes to City parks have to be approved by the Planning Board as well. I would recommend -that you contact Ms. Ohlde regarding your request. I have talked with Ms. Ohlde regarding having the Park Division crews trim the overhanging maple trees. I have given her Steve Gillis' name and number as well. Thank you for your concern. I am always willing to help in any way I can. Sincerely, GORDON C. HYDE Engineering Coordinator GCH/sdt c: Arvilla Ohlde, Manager Parks and Recreation Division THUESEN/TXTST530 anq Al Vfirts o Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan BJ6RN 0 I NC., REALTORS R MONDS, WASHINGTON 98020 775-1953 322 MAIN ST EET ED December 18, 1990 FILE Mr. Gordy Hyde, Engineering Department City of Edmonds 250 - 5th Avenue North Edmonds, WA. 98020 Dear Gordy: We would appreciate if you would consider lowering the City Park road adjoining our condominium development at 430 � 3rd Avenue South in Edmonds, the purpose being to facilitate the access of the Fire Department to our project. Also, would you please have the city trim the park maple trees. where they overhang our project.. We had a bid from our tree man of $300.00 with the City removing the debris. His name is Steve Gillis, at #742-2926.. Sincerelv. BT: pn 46 % CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works o Planning o Parks and Recreation a Engineering 9 0 - 19 December 6, 1990 Bjorn Thuesen 322 Main St. Edmonds, WA. 98020 0 aTRttT FILE Re: Release of performance bond money City Park Apartments, 430 - 3rd Ave. S. Dear Mr. Thuesen: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR tY-.AJ-,I2J / d 7 / 90 I conducted an inspection of the subject site this morning to determine if your performance bond could be released on the following work said to be complete: 1) Concrete retaining walls 2) Rockery 3) Storm/sewer lines and catch basins 4) Sewer pump station Based on the inspection, the concrete retaining walls, the storm/ sanitary sewer systems, and the catch basins are not 100% complete. Partial payment cannot be made on the above items and, therefore, money for those items cannot be released. I am recommending $1,800 be released for the rockery and $24,000 be released for the pump station. When the pump station is operational, I will recommend releasing the remainder of that portion of the bond. The total amount of the performance bond that I'am recommending for release is $25,800. If you have any questions, please call me at 771-3202. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt CTYPKAPT/TXTST530 - R 4 /"-, - Al berts I t,- 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 4za0i'* Bj6RN THUESENINC. 322 MAIN STREET - EDMONDS. WASHINGTON 98020 City of Edmofids Building Department 250 - 5th Ave. North Edmonds, WA 98020 Gentlemen: 775-1953 December 3, 1990 We would appreciate if YOU would re -inspect the City Park property and release the appropriate money for the improvenents installcd last month, for which Puget Sound Bank has a hol m back. d- The improvements installed include a concrete retaining wall, rockery, storm and sanitary sewer, catch basins (some of which are temporarily covered by dirt). The pump station has been completed except for a cast iron lid. Please mail Your letter of release to: Regan Belgard Puget Sound Bank 1325 Forth Avenue, llth Floor Seattle, WA 98101 with a copy to the undersigned. We would appreciate it if you would do this Post-haste. BT/js Sincerely, 0 BOND RELEASE FORM CITY OF EDMONDS DATE: TO: ENGINEERING DEPARTMENT LYLE CHRISMAN PLANNING DIVISION - ED SOMERS FROM: Jeannine L. Graf, Permit Coordinator PERMIT# ADB# PLAT# PROJECT ADDRESS DEVELOPER/CONTRACTOR TYPE OF BOND TO BE RELEASED :lAelr- BOND DATE POSTED BOND EXPIRES Please field inspect for.the release of the subject bond. 'If the re" '6"r�e outstanding requirements, please note in the space provided.' LOVELL-SAUERLAND & ASSOft, INC. 19400 33rd Ave. W. Suite 200 LYNNWOOD, WA 98036 LIEUUf* QXF MUSOMUL Phone (206) 775-1591 Tulr.11F.'af Ej STRE—:s., *ITEg P ATTENTIO�� F�:: �)'� -j WE ARE SENDING YOU �<Attached EJ Under separatePcar?vi`)a the following items: • Shop drawings 44prints El Samples El Specifications • Copy of letter El Change order SIM DESCRIPTION my P a Lo� mp- A? _M1&�_W;9M2ffl a pu� eTTV. W-0 M_ V R t � �J_. i R = 31, THESE ARE TRANSMITTED as checked below: ��For approval 0 Approved as submitted 0 For your use 0 Approved as noted W0 A requested For review and comment El FOR BIDS DUE REMARKS El Returned for corrections FE-1 El Resubmit -copies for approval 0 Submit -copies for distribution El Return -corrected prints 19 El PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: PRODUCT240.2 �ix,Gmtm,M=01471. if enclosures are not as noted, kindly notify us at on ce., M City of Edmonds CINTER-OFFICE CORRESPONDENCE TO FROM -1 DATE 9 SUBJECT J, &AW �t AM9 RECEIVED 8EP 0 8 1989 Pub-ilL, vvvi%im� STREET FILF — ----- ------ I Al W A t L) r -AV t0f-13 (,JT- XC)�- )I) A)4 TV 7-0 r fie0od"- el til - ------ --- -R U T�A&J "Olkin. A-r cur cpre7ptl--.-�(?mP -TZ9 5E DtTY(Gr-Jeo STRUT C7 r C. A4 7 e)- We v ec- et" A-7? t.4 .,J, L? (.3 S I - 'AM & - ------- - - NOR STRUE"i FILE M E M 0 R A N D U M January 20, 1989 TO: Leigh Francis, Associate Planner Planning Division FROM: Gordy Hyde, Engineering Coordinator Engineering Division SUBJECT: FEBRUARY 1 ADB AGENDA ITEMS I tem ADB-1-89 ' No problem ADB-2-89- No comment ADB-3-89 OK; no sight obstruction ADB-4-89 No comment ADB-5-89 Signs OK; question use, as discussed in CRC meeting ADB-6-89 No comment ADB-8-89 No comment ADB-9-89. Sign as it exists creates a sight obstruction. Would be much better if sign could be placed in planting bed on west property line. Change in parking no problem, except rhody in east bed must be relocated or replaced with plants that can be looked over. ADB-114-88' Chain and lock on alley access is not a requirement. Cross sections of site should be provided to assure us of parking lot grades. ADB-122-88 Construct curb, gutter and sidewalk along frontage of 201st St. S.W. for future 36' road section curb -to -curb. No comment GH/sdt FEBADB/TXTST530 C) Q) N71 S T R AP19-11 7 — Alz--ilV Rl -'7r A'A f�dC 144/ ,fri IVC(IV /vr �,rItIlItIVI- 0-2 -7 -ff - NI-i t A t 11VIM17 (110wl( IN 6vr1�11-IRX1111,11i­ IIWIAI(lr�e- Ale-XM- q4;lt" /7D 7V &OC, et). foe "e-�e soo oa - Y-� 116 -. Pf 4 OVI 7- J'-rK' LA./ So f. P't 4A DRAINAGE CALCULATIONS 13-Sep-89 (Snohomish County) THUESEN APARTMENTS, LSA #1076 Total area, acres 1.295 Ti me of Concentrati o n Cummulative "Flow length Vertical Ground Type Runoff 'Time of TravP1 Time feet Drop Slope Cover Velocity Travel 5.000 13 1.2 9.23% paved 6.23 0.03 5.03�- 1 43 2.0 4.65% paved 4.39 0.16 5.20-' 1 %14-99-- B. 0 paved 5.82 0.28 1 13 1.0 7,69% paved 5.67 0.04 5.52 1 Piped: (based on pipes flowing full, no pressure) length: dia: slope: n: V: time: total: R: 72 1.00 8.19%* 0.024 7.1 Z 0.17" 5.69 0.25 140 1 .00 4 . 2 1 % # 0. 024 5. 1 0.46 - 6. 15 0.25 15 1 1 00 3. 33%* 0.012 t�9:;:O-* 0 . 0 3 " 6 . 18 0.25 Time of Concentration, T(c) minutes 6.179 Design storm, l(loyr), ------------------------------------------------------------- Itc i n/hr = 2. 316 RETAINED: Area of retained flow, Ar acres 1.295 , Ar sf 56400 Exist runoff coeff, by proportional areas: C impervious areas, < 76.00% approx. 0.90 x 42864 landscaping, > 24.00% 0.20 x 13536 other 0.00 x 0 D t h e r 0.00 X 0 Total Area, sf 56400 Cer 0. 732 Flow off ret. area, Qer cfs= Htc x Ar x Cer) = 2. 195 Compare this flowrate to the capacities of all pipes listed above. Pipes are adequate. Trapezoidal channel f low calculation: 2-year storm intensity: Flow from 2 year storm using modified rational method= Friction factor 0.030 grass lined swale Side slope = 3.0 H : IV Channel bottom slope = 0.50% Channel bottom width = 4,000 feet Depth = 0.292 feet, Top width, wetted 5.750 feet Area wetted = 1, 422 sf -Z Wetted Perimeter 5.845 feet Hydraulic Radius, R = 0.243 Freeboard side5lope = 3.0 H : IV Top width with 0.750 ft freeboard included z 3.5 inches Calc'd Discharge, 0 1.95 cfs reqd flow: Calc'd Velocity, v 1.369 fps/ preferred 2.008 in/hr 1.903 cfs,,- 10.250 feet I . 903 c f s 0.500 fps max 9: 5. 54 3. 9' ' 1 7 . 07 0 EXAMPLE: The dashed line shows that the resis- tance of a 6-in. standard elbow is equivalent to approximately 16 ft of 6-in. standard pipe. NOTE: For sudden enlargements or sudden contractions, use the smaller diameter, d on the pipe -size scale. Head loss through check valves varies with types manufactured. Consult with manufacturer for correct v4l4qP. Appendix: CHART 35 RESISTANCE OF VALVES AND FITTINGS TO FLOW OF FLUMS A Globe Valve. Open ,4gle Valve, Open Swing Check Valve, FullyOpen C e Return nd los Be Standard Tee Through Side Outlet ti �� Standard Elbow or run of Tee reduced �i ��T 1�_ Medium!Tw-eep Elbow or run of Tee reduced 1/4 - Long Sweep Elbow or run of Standard Tee 50 30 K111 10 3 Z _&n- 2 11/2- 1 IN - 1/4 0.5 Courtesy of Crane Co. 0 77 CHART 4 Table of "C" Values for "Hazen and Williams Formula" CONSTANT TYPE OF PIPE CONSTANT TYPE OF PIPE 155 Driscopipe 110 Ten to twelve years old cast iron pipe 140 New steel pipe or tubing Vitrified pipe Glass tubing Spiral riveted steel, flow with lap Asbestos cement Galvanized steel 130 Copper tubing 100 Spiral riveted steel, flow against lap Ordinary brass pipe Thirteen to twenty years old cast Cast iron — new iron pipe Cast iron — tar coated but new Galvanized steel — over 5 years old Cast iron — fully cement lined Cast iron — tar coated over 125 Steel pipe — old 10 years old 120 Wood stave pipe 90 Twenty-six to thirty-year old cast Concrete pipe iron pipe New wrought iron pipe 60 Corrugated steel pipe Four to six years old cast iron pipe I I I Fitting Eres, sure Dr p: Listed below in Chart 5 are various common piiping system components and the associated pressure Ic)ss through the fitting expressed as an equivalent length of st r. aight pipe in terms of diameters. The inside diameter (i.ii feet) multiplied by the equivalent length diameters cjives the equivalent length (in feet) ofpipe. This equivalent le,ngth of pipe is added to the total footage of the piping systenn when calculating the total system pressure drop. These equiva.lent lengths should be considered an approximaticin suitable for most installations. CHART 5 Fabricaited Fi,tting Equiv. Length Running Tee . ................ 'FUJ ............. 20 D Branch Tee . ...................... ............. 50 D 900 Fab, Ell ................. ............ ..... 30 D 600 Fab, Ell ..................... % .............. 25 D 450 Fab, Ell ........................... .......... 18 D 450 Fab, Wye! ................. ................. 60 D Conventional Globe Valve (Full Open) ...... ... 350 D Conventional Angle Valve (Full OperO ... .... 180 D Conventional Wedge Gat(� Valve (Full Open) ............... 15 D Butterfly Valv(? (Full OperD ............................ 40 D Conventional Swing Chec.k Valve ....... .............. 100 D (See Appendix fc )r further data or i resistance of valves and fittings to flow.) 12. kinetic energy in the water in a pipe because of its mass and velocity. If the velocity is suddenly reduced, as would occur by the &nuck closure of a valve, this energy cannot be I sily absorbed. The instantaneous shock may generate excessively high pressures known as water hammer This effect becomes greater as the velocity is higher and/or the valve closure time is shorter. Valves should be lk '09 opened and closed slowly. Even greater water hammer can be caused by air entrapment. System design should provide ways of preventing air entrapment. Pressure and Surges: Pressure surge may be calculated from Figure 1. The combination of static pressure and surge pressure should never be allowed to exceed the pressure rating of the pipe. NOTE: To allow for cyclic loading effects and surge, Simpson recommends the working pressure be limited to 70% to 80% of the pipe pressure rating. W10cily Friction Friction Loss Velocity F,i,t,-,, Friction Loss Velocity Fe,et per Head Pou rids per Feet per Friction Friction Loss Velocity Friction Friction Loss Gallons Second t Head Pounds per Feetper Head Pounds per Feet Per Head Poundsper per Fee Square inch Second Feel Square Inch Second Feet Square Inch Second Feet Square Inch Minute 2 In. 2% In. 3 In. 1 0.27 002 OD087 0.17 0.01 0.004 0.68 0.96 0.14 0.25 0.059 0.44 0.045 0.020 0.30 0.025 0,011 0.20 0.01 00045 2 5 In 136 0.47 0.104 0.20 0.61 0.87 0.08 n - 0035 -069 0.42 0.035 O�015 0.28 0.014 0.0063 7 ------ 2.04 1.00 043 1.30 0,33 10.59 0.06 ---0.026 0 0 0.40 00 0.02 0 0.009 10 2.72 1.71 0.74 1.73 0.57 0.14 0.88 0.13 0.056 0.59 0.05 0.022 15 3.40 2.59 1.12 2.16 0.86 0.25 0.37 1.18 0.22 0.095 0.79 0.09 0.039 20 4.08 3.63 1.57 2.60 1.21 0.52 1.47 0.34 0.15 0.99 0.13 0.056 25 4.76 4.83 2.09 3 171-1 1 rl 0.70 1.77 0.47 0.20 1.19 0.18 0.078 30 5.44 6.18 2.68 3.46 2.06 0.89 0.27 1.39 0.24 0.10 35 1.59 0.31 -G-13 40 6.12 7.69 3.33 3.90 2.56 1.11 2.35 0.81 0.35 2.65 1.00 6.80 934 4.04 4.33 3.11 1.35 2.94 1.22 0.43 0.53 1.78 1.98 0.38 0.16 45 8.16 13.10 5.67 5.19 4.36 1.89 3.53 1.71 0.74 2.38 0.47 0.20 50 9.52 17.42 7.54 6.06 5.80 2.51 4.12 2.27 0.98 2.78 0.65 0.28 60 10.19 19.80 8.57 6.49 660 Z86 4.41 - 2.58 17- --� 0.87 0.38 70 97 6Z 10.87 22.31 9.66 6.92 7.43 3.22 4.71 2.91 .12 1.26 3.17 099 75 12.23 27.75 12.02 7.79 9.25 4.01 5.30 3.62 1.57 3.57 1.11 0.48 80 13-59 33.73 14.61 8.66 11.24 4.87 5.89 4.39 1.90 3.97 138 1.68 0.60 0.73 90 100 7.36 6.65 2.88 4.96 2.54 1.10 125 10 if). 8.83 9.31 4.03 5.95 3.56 1.54 150 1 '1 1 o n'--'7 001P 10.31 12.40 5.37 6.94 4.74 2.05 175 1 05 0 N 0 Oi -7 7,93 6.07 2.63 200 12 in. - U ()5 001-1 9.92 918 3.98 250 300 i -i7 0075 0 0:11,3 1.41 0 (�I 0017 - 350 i (58 009 O.UJ9 1 19 0 Oli 17, 189 0 1 i 0.048 1 onr� 400 2 1 0 0 141 0 06 i 1 19 0 J6 0026 450 14 n 2q C) -� -- -, -�3 0 i 0 056 500 i9 2 095 750 1000 (�i, 0. 16 0 1250 F� 0.78 5�96 0 79 34 1500 C; 2 i9 I �45 1 20 0, ')2 2000 2500 66 8.9-1 i 6-/* 10.43 2 2;) 0�96 3000 11.92 2 �w 1 3500 13A 1 1 -5 3 4000 -It' I it IIZI II IIUI I I IdUUTI is avaiiauie. A-9 I 1"D / 54 C q>L ,4LA-,QK LX;U 00, 1 "-A� ZAP � A6 - I Z 0 "i U C4 0 �J- CI'fY OF EDMONDS COMMUNITY SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT A. 9 Owner: Name . Mailing Address City State Zip __W q0_ Permit No. YIssue Date (n _t q -9() tA) /.n 1-1A �;7 B. * Contractor: k r 6 L41 r If 4��' N%oe ili Addr s _11to'lipf e-- P , f City State Zip (JU-7-946, State License Number Tereph6ne'Num-ber C. e Address or Vicinity of Construction: Z/ y / 3 Type of Work to be Done: 4 ±e C5-10 11A-t—, C-A-) D. 0 Work in Connection With: 0 Sub or Plat 0 Single Family 0 Commercial Multifamily E, 0 Pavement Cut: I '�g Y [IN F. 0 Size of Cut: X APPLICANT TO READ AND SIGN 0 City Projects 0 Utility INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. E• Restoration to be in accordance with City Code. T R • Street to be kept clean at all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Owne7r or'Contrdctor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: PERMIT FEE: —Zn � 0 C) Time Authorized: Void after days. Restoration Fee: Special Conditions: 1'kTMQNxx_- TV*.X,4 7TP Receipt No.: cis: 2 V6.4viry Fund I I I Fee: 199 .0c) —Jvsn'� Pprunl 1, 69NP!"—_— (A�s'La-m Street Cut Dimensions: G" "uc- RELEAC�'�FRY: vioLy— Date INSPECTED BY Date NO W6RK TO BEGIN PRIOR TO PERMIT ISSUANCE tng, uiv iviarun j— a RIGHT OF WAY CONSTRUCTION PERMIT ROUTING FORM CONTRACTOR aA DATE PERMIT RECEIVED WORK ADDRESS �(3 0 az� SIZE OF CUT: 3 x-3o DATE TO ROY WHITCUTT FOR REVIEW: FROM-ROY TO PUBLIC WORKS: PUBLIC WORKS DATE SENT COMMENTS: REVIEWED BY BOBBY MILLS REVIEWED BY BILL STROUD REVIEWED BY ARCHIE BRENA FROM PUBLIC WORKS, ROUTE TO ENGINEERING_ ENGINEERING DATE SENT COMMENTS: REVIEWED BY NOEL MILLER REVIEWED BY DAN SMITH qA r)� w FROM ENGINEERING TO PLANNING(For ALL Above.Ground Work) PLANNING DATE SENT REVIEWED BY JOHN BISSELL RECE IV �:C) JUN 15 1990 PUBLIC WORKS iieceiv E7 , ) DATE PERMIT ISSUED 4d I q /cl 6 PERMIT # qO - 2-00 (20) Rev. 11/14/89 lfc R/WFORM/TXTRECEP JUN 18 1��,U ENGINEFRING 0 .0 , 890 . 194 - CITY OF EDMONDS R E C E I V 700 MAIN ST. * EDMONDS, WA 98020 - (206) 775-2525 PARKS AND RECREATION DIVISION APR 3 0 1990 April 28, 1990 Mr. Bjorn Thuesen 322 Main Street Edmonds, WA 98020 Dear Mr. Thuesen: FNPINIFI`701N'r� STREET FILE LARRY S. NAUGHTEN MAYOR Since construction commenced this past week on the property North of City Park, a dangerous situation has arisen regarding construction vehicles parking adjacent to the park road exit. This is creating a blind area where drivers exiting the park cannot see vehicles traveling on Third Avenue. I have discussed this with the on -site Project Manager but the situation still persists. Could you please discuss this with your Project Manager and all subcontractors doing work at this location? I would recommend holding vehicles back at least forty five feet on either side of the exit. Your cooperation will be greatly appreciated. Sincerely, Y6�_ "N Pat Harris Park Maintenance Supervisor cc Arvilla Ohlde f:D6n=Sfffth:!-1� , �'/ 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan 0 Lovell-Sauerland & Associates, Inc. Engineers/ Surveyors/ Planners/ Development Consultants City of Edmonds Engineering Dept. 250 5th Ave. N. Edmonds, WA. 98020 Attn: Jerry Hauth Dear Jerry: ST t"ILL"J FILE 19400 33rd Ave. W., Suite 200 Lynnwood, Washington 98036 (206) 775-1591 Seattle: (206) 340-0830 FAX: (206) 672-7998 March 30, 1990 LSA File No. 1876 As you requested yesterday I have verified the grading quantities on Bjorn Thuesen's City Park Apartments. The calculations in our file show 2631 cubic yards of cut and 937 cubic yards of fill, based on average end areas of plotted cross sections. Therefore the 3,600 cubic yard figure in the grading permit application is accurate. I have also modified the drainage and grading plans to provide dual culverts in the swale as requested. One copy of each of these sheets are hereby forwarded. Let me know if there is anything else you need. Sincerely, 6&xi aAjq Craig Campbell, P.E. Cl S"l'-REi"-:T FILE #297 P01 SER WCOATINN RECEIVED WOER HIGH—TECH COATINGSt INC. FACSIMILE TRiMBSIZTTAL SEP 10 1990 FAXi (206) 030-3096 WINEF-PINP DATZ TO.. FAX COMPANr I PHONEs ADDRESS2 or FRONt PHONE.- 6=a�t6ASD 14— TOTAL NUMBER OF PAGES (INCLUDING THIS COVER SHEET) REPLY REQUESTED: YES* BY FAX yza, BY PHONE no MgRjm I �\ ��& I 4044*0�--- SEP- 10- 1 90 MON 10: 55 AWASSER H I GH-TECH �R V TEL NO:2M-85QmZ367 9297 P02 IR SRI M-11 I H - T I C H C 0 A T I M G P1 ngid-component, moisture-curing urethane �6.�:.'Urq thaneWtopcoat OD Color: BIS4 NO solids, VOC oompliant c oating KID o Any use where steel or concrete is immersed or exposed to splash, zone, high humidity, sewage, or buried environments U o Any use where coal tar epoxy has been used and a better finish W des frad 0 Any. field repaint of the above uses where cold, damp, and/or high humidities limit the use of typical epoxy or urethane Mks .00 Single component - no catalyst mixing errors Can be applied In cold, damp conditions - at humidities to 99% Can be applied at low temperatures - to below freezing o Supodor to coal tar opoxy for heat resistance, chemical V A resistance, flexibility, weathering, and resistance to cracking M 0 Oumt.anding resistance to salt and fresh water in immersion or TyplaW urethane fleMbility and abrasion rosistance o Typift urethane resistance to cathodic disbwdment @ o Czn be Immersed In one hour - means very short down times o. rematable, easily repalred VOC do . m0liant SEP-10-190 MON 10:56 R HIGH-TECH TEL NO:20 . 6-e50#7 #297 PO4 )MA291114 H12N-T&H COATINgl Coating Speciflostion 126 **&I tar epoxy, and other coatings with MC -Tar. 1. Purpose: To proWe an improvod altomatlyo to typical tar or epoxy tar coatings, and one that also h" Impravod oppiloatlon and curing propertlem 11. Surisee Pr6palWon A. Over bar* steel, use SSPO-SP1 0 Near While Blast for irnmeralon, and SSPO-SPS COMIMMal Blast for norrnal, non-Immorsion or buried applbatlons. 9. On concrete, rernovo Qxce so dirt, grease, and chalk by sweep or waleilb�hg7—N C. Over old c*"s. use swoop blast or high pmasure water blast. 0. Over galvanized steel, surface must be free of wease and oil. F. When used over MC-Zlno, use 2-4 mils DFT (Dri Flkn ThWen) of MC-Zlno. F. Over aid tW* adherent 9Mxy tar, M power wash or solvent wipe. Note-, This procluct and most Wasser urethanes are des" to adhere to poo4 ptpared surfaces such as old paint, tightly adherent ruat, and poorly dmrvd surfac#6; however, test patches should be made when good surface preparation Is not po"Ible. Ill. Coating Applij one or more coats ot Wasser MO -Tar by brush, railer, or sprity at 4-8 0 FT per ooal. 1. Use M&Tar at 10-12 rdis to replace 16-20 rrils "10al coal tar epoxy on steel orconcre-Tv.,, 2. Use a-12 mils MC -Tar to reVace 40-80 mOa hot dipped tar on concrete, or burled or non- 3. Use 6-10 rnlls MC -Tar to replace 40-80 mlls hot doed tar on galvantzed surfaces, W';� �;;L _Z_� C cv- 4 — (D i&.A I MA Q SEP-10-190 MON 10:59 HIGH—TECH TEI- NO,'2CE-850j—f7 #297 P07 -Application Guide H 10 N - 7 E C N C 0 A T I N 0 8 Waterworks, Wastewater, Pipeline Description Preparation First Cost 5scono Co t Third Coat Material DFT Material DFr material DFT (see no 1) (on rM 2) Genervill ftellwork ImmerM In fresh or Saft Water 10 MO-711M 3 MC -Tar 6 MC -Tar 6 Previously PaInted PP1 MC-21ric Spot MC -Tar 4 MC -Tar 4 Where Color Is Requirad 10 MC-Zhlc 3 MC-Forrox B 3 IVIO-Ferrox A 3 CMOs, I aft 10 MC-Zft 3 MOTar 6 MO -Tar 0 Whore Color Is Rwplred 10 MQ-Zft 3 MO-Ferrox B 3 IVIO-Ferrox A 3 peftelodge 10 MCZIne 3 MO -Tar 0 IVIG-Tar 6 Radisill Oftiners TM*h Rafte 10 MO-ZlInG 3 MG -Tar 5 MG -Tar 6 Stml Empos to 96"ge PH 4-11 10 MO-ZOM 3 IVIC-Tar or 6 MC -Tar or 6 MC-Forrox B 3 MO-Ferrox A 3 PH 2-12 10 MC-Ferrox 8 3 MC-Ferrox B 3 MC-Ferrox A 3 Concrete 04wwr BT IVIC-Tar 6 MC -Tar 6 Over Od Epoxy Tar FF1 MC -Tar 6 MC -Tar 6 Pipeline Buded 6 MC-Zlnc 3 MO -Tar 6 MC -Tar 6 Immersed In Fresh or Sal Water 10 MO -Zinc; 3 MO -Tar 6 MC -Tar 6 Above Qmnd 6 MO-ZInc 3 MC-Ferrox a 3 MC-Ferox A 3 Previously Painted 13151 MO -Zino Spot MC-Ferrox B 3 MC-Ferrax A 3 To Replue Hot Tar PPI MC -Tar 6 MC -Tar 6 *A11 Wasser systems a e recommenj for use wfth cathod r "I Ion. Note: I -SUOfts, plow 0" Q) a. Where Wasting Is done the number I* the 5SPO-SID number, le, SSIOC-8126 Commerolml Is 6, b� Where old coating Is not removed the number will be MI. This is sweep blast or power wash wO spot oleanIng or blastIng of spot comnlon. c. Blast Track or SlastIng of corcrute Will tle &T. 2. OM Is the dq film thIckrwme. tarmult the IndIvidual data shoot for coverago at this DFT 0— SEFI-10—*90 MON 10-.56 '10 SSER HIGH—TECH TEL NO:206—Erz) 4 7 #297 PW $00 bY V9141IM: 01.0 12,0% WOW 10.5 * 0.3 ba H 0 VOO: Less ftn P-8 lWgW N a coversp M 0 MIS: 160 ft A , RecoatsURty: Anythe after 4-6 hours L 0 TemperaWre resistance: Wet, 1005 F conflnuou5; dry, 2406 IF continous D a Flash mW: Move 9V F A T # Shoff Iffe: 6 mordhe from date of shipment, In unopened original oontalners stored at A ternperatures below 851, F p - Civer bare e", we GGPO-81710 Hear WNto Moist for Immersion, wW SOPO4PS Commerclial R Most for normail, nonrImmerolon or burled applications. 9 E - on eancrello, remove *moss@ 4K grea", " ehalk by sweep or water blasting. U R P A 9 Over old oolatings, use sweep blast or high pressure water Watt. r R 6 Over galvanized steel, surface must be fres of grasas and oil. A A # When used over MO-Enc, use 2-4 mills DFT (Dry Film Thickness) of MC.Zlnc. C T s Over old 4htly adherent epoxy tar, use power wash or solvent wipe. E I 0 Note., This prockjot onal most Wasser urethanes we desloned to adhere to owdy orsoared surfaces such as old N point, Ighq a won rust, and " eboned surfam; however, lost paW*s should be make when good surlince preparation Is not p*W*. 0ansuld VM PaIntina 1=0 A Us$ imV MC-TNnnsr P ApM&t4-7ml1sDFTP9rcoa1. Avoid single applWons above 10 mils DFT. P On ftes! #V over MO-Zina N posablo. This glvn cliahodic poevion I there Is any mechanical damage. L D . core minlinum 4 hours between costo a! minimum M relative humldky and 40-ov F. If I humidity Is 10410% or tonmrsturs Is 254CM F. allow more time between omft FlIme above 6 mile OFT A Muka, longer dry tirnso. bs Immersed dw arm hour. If adelftlemall eaets are required, Immorolom Is permitted between coats. Tever mill *ohs amcl reeklue must be washed away bo%re reme mg. 0 Mollon WasoorMOmrstheine may be appW I& damp ourfacee at very high humiftes. AvolclaOlodtlon~ N obvkws wet d"s or puddes of water. Av*W dppkg a damp or wet brush or roller back irft the point ropootody br bM P*Ws of dma vAftLit using mom mft Inuoduche water IMD the Point con cause collina. P This product Is for lndustrW use only. $ I jA mnma; vapor and spray mist are hwrdul. 0onsult the material sialety data shoot. Use an F U &Wmvvd respirator In confined areas when brushing or rolling. Use a positive preawre air flow T T hood when expood to spray mict or overspray, ftted skin and eyes from contact. This Y I 0 product contains organic solvents and polylsocyanates. Do not use N you have a chronic or N allergic maction to Isocyanates or organic solvents. wgsm Ngh-Tach Combngn wwrmn ho Fackmo M OR MW *M OVNM In M&W40 WV Wor"ana"O. wow MV1-'TQM Coamp am owanismofWadum notoonloffftingto this Warranty worodho nomwhrmhS Products. Any Vf cMmunftrheftnmtymnttiamadebyBuywtcWuwHlgh.TechCoadnpinwlingvAtNnflys(S)dapofBLWa41=mwyofftda�MW A OploA but In me ~tIsW #w 0* *q4raslen of ft aWlqWo ohelf 619, wain man1he from dw dMKwy dow wtilclvavo isoarrw. Buyves R isl1wre is nodly Weaver H10,Tech Ccalnoil of such non-conbirltance a required hereir shsII bar Buyw from rowim under this Warranly. R Wa&wHoh-TachC4&*VomemnDotwwm#osmmrgrtgtmproduca. No*orwaffandst,whoftro*m,imMled,mewulory, A won wilcularpm"ve, "lap*. In moonnt shalt Weaver Hoh-Tech C"9"s be 40s, for N ansamMotdoll damseis. T to to L= ofthe produm fflads by W�r High -Tech Cioatings, whether In Its achnical Iftbraturt. Y win slow is fe spealkinwq, or =,libuoll on dOWWW"d 0 be (0100; hmm, Me pamiucaaM WwWon am lnwWod for use by VL"n hat" mqLmm skill am knour-tow in the Mary, W therMn It Is lor Buyer w 900Y MW of ft MANWIlly of ft pro"M for he ~ limidadar um &gd It shall ho dearned to BWer has dwo w. ath nab dlawedon and Ask. V&Iatfom In wAmmwant, Ow" In MOMM alum, at*xWelailon eldwrmq uu unatisfacu"rautu. 11� LMr OP WMiL"Y - Wssaoe% M&WIV on any aWm of any kkW, WiMudn# alaJrns baeod Lpen Waoseee negilgenew or strial 1"Ity, bw any Ion or darnago wising out of. amweelsel with, or nesuillng him the �= of the Products, shall IM f1b aM *Mod 00 Purchase PAN to W do ~ give das to dm claim. In no swei r "I Wassor be Mile for consequertle! or IncIdenial BEF-10-190 MON 10:56 HIGH-TECH TEL NO:206-850- 7 4297 P06 '0'5� W . [Prignmoo MO -Zinc MW varagglo, @may jo uee, x1no doh coating. MC-GR PrImerfTop0oat Scolalty PrImertboating with chemical resistance for steel and la UmInum. Wic-Ferrox 5 Unique MIOX coating with many use@. OW poesible primerl Interme0late on previously palmad brldgea and meAno steel. Colore and metaillos. MC-Intermadlate Universal pHrrierAntermedlate In marine atmospheres, MC -Luster Intermediate Low gloss, aliphatic, long We exterior coating or colored base cost under MG*ear. Colors and metaillos. = 7=� MC-Shleldcoat Super color coat. aliphatic long life exterior ooating. High glosso chemical resistant coating on structures and floors, All colors. Mr-Werrox A Unique MIQX aliphatic coating. LongW life of any urethane. Many uses, brldges, chernIcal, Marine. Colon; and metallics. MC.-Aroshleld Arornatlo version of Shleldcoat. Hlyh gloss, chemical resistant. I .Interior or clow y exterior MC -Tar WHOX,orreg IRr SUPS F coati ng to replace coal tar epogy. Usewlth r�apld Immersion on splash zone, pipeline, water -works, marine, and pWar mill. mc-clou Mom durable chomW realutant, all hafl@ @@&On@. Super high ?lose on woo(l, concrete floors. Long C cloa=at over W-Lustor n1jormadlate and MO-Forrox A. InduWal, madnQ, autornallvo. MC-Arodear Same properties as MC -Clear, but for Interior use. 0 apdslv caognpo MC-GonSeal Sulfide resistant sealer/coating for concrete pipe colors and clear. MC.-Antigraffitl Clew All the proponles of MC -Clear, but repels everything, Ice. marldng pens. paint. dirt. Very light slable. MC -Aluminum PrIfflGF. tOPCOat In metalile colors and silver. Recoats weathered galvanized steel. Incapsulates rust, Universal costing. Note: All of the above p"cts can be applied In cold, darnp or high humidity atmospheres and osn be Immerwd after one hour. -296 SEP-10-190 MON 10--57 Z7 HIGH-TECH TEL NO:206-950 0 7 U297 P05 0 H T E C H C 0 A T I N G 5 SUNGLE COMPONENT MOUSTURE CURE URIETHANES Highest Performance Tmuble Free Application - Maximum Coating Life . i, 0 Best Corrosion resistance Oan W appliud on oold dump 3urfaous - Broaciest range of gonerai oherriloal at temperatures Wow freezing resistance at humidities to 99% - Urethane flexibility, weathering and No dew point restriction abrealon rGaletance 0 Outstancing color and gioss retention Simpie to Specify - Fewer application delays - Year round application season a VOO oompllant -��Does not require an approved applicator LOVELLSAU'&Ai�& ASSOCIAT 2* C. 19400 83rd Ave. W. Suite 0 LYNNWOOD, WA 98036 LIETTS OF -TRUSED VUL 9 Phone (206) 775-1591 TO _C IT-/ OF EDr--0L0tjMCz1V&r) JUN 2 issn gn P., ENRIAIpp-alm 1 NUJ FILE �fj!;j WE ARE SENDING YOU ;��Aftached El Under separate cover via— • Shop drawings El Prints Plans • Copy of letter El Change order F1 0. DATE 7`5� -12)1(0 ATTENTION L L EYL RE: 0 Samples the following items: 0 Specifications COPIES DATE NO. DESCRIPTION _Z_ . THESE ARE TRANSMITTED as checked below: 0 For approval 0 Approved as submitted El For your use El Approved as noted 1)?� As requested El Returned for corrections El For review and comment 0 0 FOR BIDS DUE _19— REMARKS El Resubmit —copies for approval • Submit —copies for distribution • Return —corrected prints El PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: U� '-SN�11 U 9_1 PRODUCT 24D.2 J� Im, GroWn, Ma% 0 14 7 1. If enclosures are not as noted, kindly notify us at once. 0 P& t—,-D 2q M E M 0 R A N D U M June 11, 1991 STREET FILE TO: Dick Mumma Building Official FROM: Ron Holland Water/Sewer Supervisor SUBJECT: ACCEPTANCE TO THE NEW LIFT STATION Q-rq WAior— X,<,-r-S In regards to acceptance of the new Lift Station for sanitary waste for the Third Ave., Park Apartments. We have inspected this facility and found the following changes are needed in order to finalize this project. These changes are currently being worked on and should be completed in no time. 1. Brackets for floats are to be relocated by pump tech incorporated as per City requests. 2. Locking nuts on electrical panel are missing. When these changes are completed the City will grant full acceptance of the lift station. These changes are to be completed in two weeks. RH/ho cc. Lyle Chrisman NULIFTST/TXTSEWER W EST & Assoc,ATE5 41--) 6 7,S - � C) HONG 0 construction inspection *RECEIVE,) Geot!t�hniycl ring - HydrogeologY . Materials Testing ee; 7 1991 INSPE9TION REPORT E NEE I r/NEE C,1141t,�j4 A A 'AA DATE: PROJ FECT: GENERAL CONTRACTOR: LOCATION: 7:3/ 0-* RE CONTRACTOR'S P IVE: JOB NuMBER: oco OUR REPRESENTAT SUB. CONTRACTC)R-. 4Y (hXL_ Fil PERMIT NO: ------- ARCH: eli C_ SUB.- REP- Z7 ENGR* —ALL .. .... .... 411 4)__�70 )4v- _4 _7 -W PAGEj NG -TV L'. , HWA 101-90 Ottice Copy - . White Job Site COPY - Yellow Inspectors COPY - Pink HONG CONSULTING ENGINEERS, INT.Sclel'qloil o GeotechnicoJ Engineering a Materlol Testing o Construction QuoJit �6 _y Control h7t IRNG FIELD DENSITY REPORT r Pro j e ct, est Apparatus, Mach No .. . ....... Address:. 7315- 57- S W SToil Description: ..... Crx C�V �/'o 0 0 C Job Number: T le�r alto!/ Ai .. ...... C "S)ol I -77. ....... Date Tested:. By: Specified Compaction: Client: ... Compaction Standard: /�'�'7-4-1. Minimum Dry Density: PC F Maximum Dry Density: 710, PC F .......... - . Attention: Optimum M.C.: 7,0 ... ................ Test No. Location 'CZ0 tit Elevation 6 3 /5S. .... Wet Density PCF -5- 133.11 M, 71 0. ... .. .... M o i sture Content % 1113 71 Dry Density — PCIF 0 Compaction — % /Ab,O /d7b*/ —1 Test No. ........... Location ................... 41 ...... .. /0 �14 Elevation Sr C-7 Wet Density — PCF 139,S /�,9- Moisture Content % .. . . ...... - ;7 Dry Density — PCF 1311, /3 Compaction — % /0 0* y 6 �15 1A5'V /j/'0 ,A) All tests performed in accordance with ASTM .9w 0 .0 M E M 0 R A N D U M May 22, 1991 TO: Ed Somers, Associate Planner FROM: Gordie Hyde, Engineering Coordinator UJ SUBJECT: ADB AGENDA COMMENTS ADB-38-91: Applicant to comply with Ordinance 1924 regarding storm drainage. Right-of-way construction permit required for driveway approach. ADB-43-91: No comment. ADB-45-91: No comment. ADB-46-91: No comment. ADB-51-91: No comment. ADB-52-91: No comment. I ADB-53-91: No comment. ADB-66-88: Suggested revisions for parking is okay, except two (2) handicap stalls required. ADB-37-90: Final civil engineered site plans to be approved by City Engineer. ADB-123-90: No comment. ADB-31-91: College Place traffic mitigation fee required. Driveway width to be a minimum of twenty-four (24) feet. Incomplete submittal. Engineering will not review. ADB-32-91: Driveway width needs to be fourteen (14) feet curb to curb or show gutter. Access easement to be improved to City standards or remove westerly access. Right-of-way construction permit required for curb cut. ADB-47-91: Applicant to provide proof of public easement from Edmonds Street. Seven (7) foot wide sidewalk required in R.M. zone. Storm detention required. ADB-49-91: Seven (7) foot wide sidewalk required in R.M. zone. ADB-50-91: Storm detention required. Seven (7) foot sidewalk required in R.M. zone. Applicant overlay alley if condition warrants. Existing curb, gutter, and sidewalk to be repaired if condition warrants. GCH/sdt ADBCMNTS.ADB/TXTST530 Av rt) - �61 9 0 9 C� May 14,1991 CITY OF EDMONDS 250 - 5TH AVE N - EDMONDS, WA 98020 o (206) 771-3202 COMMUNITY SERVICES: Public Works a Planning a Parks and Recreation a Engineering Mr. Bjorn Thuesen Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 RE: Temporary Occupancy Mr. Thuesen; STRr- R-11-E RE:CE:1 Ve 1) 14A Y L D iq� , ENGINEERING LARRY S NAUGHTEN MAYOR PETER E. HAHN DIRECTOR In response to your request of May 13, 1 have compiled a list of corrections forwarded to me as a result of inspections on your site. I will break the list into two categories; 1. Those items that must be completed before a Temporary Certificate of Occupancy will be issued and, 2. Those items that have been identified to date that must be completed be for a final occupancy will be granted. REQUIREMENTS FOR ISSUANCE OF TEMPORARY OCCUPANCY BUILDING DEPARTMENT: The Building department is willing to approve temporary occupancy at this time. FIRE DEPARTMENT: On 3/12/91 the Fire Department granted permission to occupy Building #B. The records do not indicate any other building has been approved. At this time only building #B may be occupied. PLANNING DEPARTMENT The Planning department is willing to grant temporary occupancy at this time, with conditions. PUBLIC WORKS DEPARTMENT During an inspection this morning (5/14/9 1), Public Works partially tested operation of the lift station on the site. The lift station is apparently operational, but the telemetry has not been installed. Since there is adequate storage capacity for one (1) unit in the event of system failure, temporary occupancy for one (1) unit can be granted at this time. ENGINEERING DEPARTMENT: After inspection this morning (5/14/9 1), the Engineering Department is now willing to grant a temporary occupancy, with conditions. 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan CONDITIONS THAT WILL BE PLACED ON TEMPORARY OCCUPANCY 1. Install lift station telemetry by June 15, 199 1, as required by Engineering and Public Works.. 2. An application must be submitted to ADB by May 21 st for changes made in the following areas: a. Landscaping installed does not match the approved landscaping plan. b. Installation of unscreened mechanical equipment contrary to approved plans. c. Changes made to exterior lighting. Approved plans indicate nine (9) exterior light fixtures, but only five (5) were observed on site. d. Brick pavers shown on plans were not installed. 3. A permit is required for the fence adjacent to 3rd street that was not shown on the plans. This fence appears to be in the city right-of-way and will have to be moved or a street use permit will have to'be obtained. 4. Problems have been identified with the approved parking plan and must be resolved before final occupancy can be granted: a. Four parking spaces were under sized and may not be counted if they do not meet Engineering standards. b. The second handicapped stall shown on the approved parking plan has not been provided. c. Two spaces were not properly striped. CONDITIONS FOR FINAL OCCUPANCY The following items are those that, to date, have been identified as corrections required before a FINAL OCCUPANCY will be granted. FIRE DEPARTMENT: All building on site must be inspected by the fire department and approved for occupancy before a final occupancy will be granted. Currently only building #B has been approved for temporary occupancy. PLANNING DEPARTMENT: The planning department has forwarded a list of corrections to be satisfied before a final occupancy will be issued. These corrections include: 1. ADB approval of all landscaping changes that have been made. 2. Approval and compliance with the required fence permit. 3. Insure the required parking has been provided. ENGINEERING DEPARTMENT: The Engineering Department has forwarded a correction list to the Building Official after their site inspection. They asked that no final occupancy be issued until the following items have been completed; 1. All drains and sewer manholes must be cleaned of all dirt and debris. 2. 'Me on site sanity sewer lift station control panel is not accessible. The existing enclosure is too narrow to allow for access to the "Power Disconnect Switch". 3. The lift station alarm system has not been tested. 4. Current configuration of check valves in the lift station does not allow for alternative by- pass. If one by-pass fails the system will fail. 5. Parking stalls at the side and rear of Building A and in front of Building B shall be in compliance with city parking standards. 6. Open plugged drain at the base of stairs to garages Building A. 7. Install locking nuts on all manhole covers. 8. Grout pipes, in valve vault, that run to lift station. 9. Grout all catch basins and manhole extension rings including grate at rockery near stream. 10. Clean out oil separator and all catch basins. 11. Connect downspout on south side of building B and southwest comer of building C to storm water tightline. 12. Secure chain link fencing to fence posts. 13. Provide a locking latch on lift station gate and widen east side of enclosure an additional 30 inches from its original position. 14. Provide required as built drawing of existing utility development. 15. Install lift station telemetry by June 15, 199 1. (will be noted as a condition of the Temporary Occupancy). 16. Repair asphalt paving on south side of building A. PU13LIC WORKS DEPARTMENT: The Public Works Department has forwarded a correction list to the Building Official after their site inspection. They asked that no final occupancy be issued until the following items have been completed; I . Telemetry for the lift station must be installed, tested and fully operational. 2. The generator hook-up must be compatible with the city generator and the motors must be in the right polarity. I hope I have provided you with the information you need to make progress on your project. Please contact me if you have any questions. Sincerely, F-1 Ile-a- R. Dick Mumma Certified Building Official cc: Mayor Naughton Peter Hahn, Community Services Director Robert Chave, Planning Manager City Clerk for distribution to City Council Members December 18, 1990 Mr. Gordy Hyde, Engineering Department City of Edmonds 250 - 5th Avenue North Edmonds, WA. 98020 Dear Gordy: We would appreciate if you would consider lowering the City Park.road adjoining our condominium development at 430 - 3rd Avenue South in Edmonds, the purpose bei ng to facilitate the access of the Fire Department to our project. Also, would you please have the city trim the park maple trees where they overhang our project. We had a bid from our tree man of $300.00 with the City removing the debris. His name is Steve Gillis, at,#742-2926. Sincerely, BT: pn BibRN U_-_'U1E6EH1NC. 322 MAIN STREET - EDMONDS. WASHINGTON 98020 775-1953 June 22, 1988 FILE Ms. Lee Francis, Associate City Planner City of Edmonds 250 - 5th Avenue North Edmonds, WA 98020 RE: Architectural Design Board review of City Park Apartment Complex; 430-3rd Avenue South. Dear Ms. Francis: In answer to your memo to us I would like you to include the following conditions with our application previously submitted. We are attaching a copy of your memo for your reference. 1. D.O.E. approval of sewage pump station will be applied for and received prior to our submitti'ng building plans for the project. This per our consulting engineer, Lovell-Sauerland & Associates. 2. Temporary erosion plan will be submitted with application for building permit. 3. The wetlands boundary was determined by the environmental consulting firm of Shapiro & Associates. The report was submitted to Mary Lou Block and she responded by letter to us, the recommendation contained in which we are follow- ing to the letter. 4. Hydraulics permit should not have been obtained. We do not intend to trespass past west of the wetland boundary and intend no construction of sidewalks, etc. on wetlands property. 5. Emergency access is optional by the City. 6. We are going to eliminate the gate in our final plans. ... continued N Ms. Lee Francis City of Edmonds Page Two 7. Our architect incorrectly used another city's requirements for back -out width. Our final plans will show the required 42 feet by simply moving our rockery and parking area the required distance north, along our north property line and by moving the sidewalk westward along the east side of Building B. 8. A slope profile will be submitted for Ci'ty approval with application for building permit, however, by spending a few minutes on the preliminary site grading plan submitted to you, you will see a gently sloping parking lot where, for example, the 120 ft. on the north side of Building B will slope from 31 ft. down to 28 f-t, a mere 2-2%. You can determine that easily by comparing the basement floor eleva- tion to the numbers in front of the garages and by the top inverts of the catch basins. 9. There will be no earth removed to other locations and/or brought into the site. The grading plan balances the quantities. 10. Building A has 4 double garages and 1 single total of 9. Building B has 3 double garages and 9 singles total of 15. Building C has 8 single garages - total of 8. In addition to the above, we have open parking spaces of 26. ... for a grand total of 58 11. Two handicap parking spaces will be located in the two northerly stalls by the cluster of four open spaces near the building entrance. Two more handicap parking spaces will be located in the westerly two spaces of the 5-space cluster in the northwest parking area. We have requested from our environmental consulting engineer a re- landscaping proposal pertaining to wetland species, said species to be planted in the 20 ft. buffer area where needed and will be included in our future landscape plan. BT: pn enclosure cc : Mary Lou Block , Manager of Planning -NCO X, AIWl t,�S vel 41 iso, --4v" Je "a a I/C I 'Tee L 4. Cl,'F.r.OF* EDMONDS SERVICES DEPARTMENT ���HT'_OF-'W,,�Y CONSTRUCTION'PERMIT A. 9 Owner- . Snohomish County'PUD No. 1 Name . . P.O. Box 1107 Permit No. Issue Date 7 B. 0 Contractor: Name Mailing_Address Mailing Address Everett, WA 98206 City State Zip City State Zip Lorren Patchett 347-4353 Project Eng =UX=KdfNWUbU Telephone Number C. Address or Vicinity of Construction: 430 3rd Ave S 6W '7f Type of Work to be Done: Qpen cut 3rd Ave S to construct a 1phase distribution Zine to serve City Park Apts W D. 0 Work in Connection With: 0 Sub or Plat El Single Family El City Projects El Commercial El Mul*mily '111U, Wity 21 50' E. 0 Pavement Cut: E Y El N F. 0 Size of Cut: X APPLICANT TO READ AND SIGN INDEMNITY:. Applicant understands and by his signature to-this-anpli agrees to, hold the City of Edmonds, harmless from any- injuries, damages, or claims of any kii 'criptipp.'�rh og r, fpr n_orrzri �orseen, that may. . P ployees, incl ding �71 ed be made against the City of Edmonds, or any of its departments or eal o not li to the defense of any legal proceedings including defense costs, court costs,�'and attorn I fe s by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE,FOR WORK4)ANSHIP AND MICR)IALS FOR A PERIOD OP ONE YEAR FOLLOWING -THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is COT, I t U by City forces, at which time a debit or credit will be processed for issuance to the applicant. T . • A 24 hour notice is required for inspectio ' n; Please call Engineering: 771-3202 • Work is to be, inspected during progress* and at completion. • Restoration to be in accordance.with City Code. -TH E. • Street to be kept clean at all times. STREE 9 Traffic Control to be in accordance with City regulations. All 'street - . cut ditches must be,patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. 9-13-90 Signai Date:. Owner or Cont cior T is P �rm h it Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work �. APPROVED BY: Z Time Authorized: Void after -days. Special Conditions: NO UPE_r4 C_uli V) -3e, -1 TY D Ro#.0 15cif ent41_)(' Ot4 NgRMAU RCWESTa C SHAL.L ALt-OW RQA'D CUT QN TH15 PEKMIT 7 w (;t H FA�,F_o 0tJ Cow0l-1`10NS ot4 OTH6K CONSTOQ(,-MONJ� RELEASED BY: Date 31to AVC AA10 6Vr_14L#11y', NO-,WOR . K�TO BEGIN PRIOR TO PERMIT ISSU)kNCE PERMIT FEE: VU42 Restoration Fee: Receipt No.: Fund I I I Fee: Street Cut Dimensions: x INSPECTED BY . . Eng. Div. March 1989 FIELD INSPECTION I I - Route copy to Street 11ept.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Fng. Div. JuIv 1985 0 CITY OF EDMONDS 250 571-1 AVE. N. - EDMONDS, WA 98020 - (206) 771 3202 e COMMUNITY SERVICES: Public Works * Planning o Parks and Recreation 9 Engineering 890 . 1 99 .?— -U September 16, 1991 STREE r FILE Bjorn Thuesen Bjorn Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 LARRY S. NAUGHTEH MAYOR PETER E. HAHN DIRECTOR h,j,� �11�71�1 RE: Quit Claim Deed for Fence at City Park Apartments 428-432 3rd Avenue South Dear Bjorn: We received the subject quit claim deed but unfortunately the land you are deeding to the City already belongs to the City. What we need is the fence deeded to the City with a clause stating that repair, maintenance, and liability of the fence will be the responsibility of the owner/owners of City Park Apartments. If this is not satisfactory to you, then the fence will have to be moved to your property line. If you have any questions, please call me. Sincerely, Lyle Chrisman Engineering Inspector LC/dm Enclosure Quit Claim Deed cc: Dick Mumma, Building Official Street File Thuesen B:\Word 9 L�� Alberts E o Incorporated August .11, 1890 a Sister Cities International — Hekinan, Japan UIT CLAIM DEED THE GRANTOR, BJORN THUESEN, INC. , for and in c-clsideratior. of mutual benefits to be derived, convey and quit claim tc the City of Edmonds, a municipal corporation, the following described real estate, situated in the County of Snohomish, State of Washington, including any interest therein which grantor may hereafter acquire: The westerly 2 feet of that portion of 3rd Avenue South in Edmonds laying easterly of the south 48 feet of the easterly 400 feet of the north half of the northwest quarter of the northeast quarter of the northeast quarter of Section 26, Township 27 North, Range 3 East W.M.; EXCEPT the north 190 feet; and,.EXCEPT roads. together with the right to make all -necessary cut or fill slopes on the land of grantor's adjacent to the above -described real property in connection with the construction, maintenance or improvement of the above -described real property for purposes of a public roadway. DATED this day of 1 (1) 111-XIA40:-�Cl ..... ysllc� -xCK'\0W'LEDGN A PEPRESENTATfVE CAIP_Ac__I&F�� IENTI'\ \AOTA/?,� �7 j; BLI� Q� Snohom-ish n ___J�jorn ThueS_Q_.__.___ S�a- he indiviciLia,(S) -v ­;1'. m—ed that wa� Ntc._ to -1 a7t� ackno-, 1 V.C-_qed iz as 0he d rn_Thu_e_sen__, Inc-.----- e n t free _�-Ic of S-._­_!- 22:1%- for �hc- Use-S and pu,-poses �,e instrunnept. Y ru 11 I-Ic FOR -1 i: E E �TNGMN; t, 11 IC T_ Mv z�?,.z__ M AU BJORN THUESENINC., REALTORS 322MAINSTREET - EDMONDS. WASHINGTON 98020 775-1953 a "`TRE"'-T FILE t September 11, 1991 Mr. Lyle Chrisman Engineering Department 0 C ity of Edmonds 250 - 5th Ave. No. Edmonds, WA 98020 Dear Mr. Chrisman: Enclosed please find Quit Claim Deed to the fence on City property at approximately 428 - 3rd Avenue South. We are correcting the parking situation so that we should be able to obtain approval by next week. S i n c e r e 1 y , BJORN THUESEN, INC. Bjorn Thuesen, President B T / j s cc: Richard Mumma/ BUILDING SEP 12 1991 CITY OF EDMONDS 250 51 H AVE 14 - E DMON DS WA '-180,'() - 171 COMMUNITY SERVICES: Public Works o Planning o Parks and Recreation e Engineering 1 8 9 0 - , c) 9 - I September 16, 1991 AP% %. - Bjorn Thuesen Bjorn Thuesen Inc. Realtors 322 Main Street Edmonds, WA 98020 LARR, S [�AU(-' HTFN BUILDIJVC SEP 8 199, RE: Quit Claim Deed for Fence at City Park Apartments 428-432 3rd Avenue South Dear Bjorn: PITER E. HAHN DIIIEUTOR We received the subject quit claim deed but unfortunately the land you are deeding to the City already belongs to the City. What we need is the fence deeded to the City with a clause stating that repair, maintenance, and liability of the fence will be the responsibility of the owner/owners of City Park Apartments. If this is not satisfactory to you, then the fence will have to be moved to your property line. If you have any questions, please call me. Sincerely, / & /.? e / 4 L le Chrisman Engineering Inspector LC/dm Enclosure Quit Claim Deed cc: Dick Mumma, Building official Street File Thuesen B:\Word e Incorporoted AUgLlSt 11. 1890 0 Sister Cities International — Hekinan, Japan a QUIT CLAIM DEED THE GRANTOR, BJORN THUESEN, INC. , for and in �-cris-lderation of mutual benefits to be derived, convey and quit claim tc -L.Iie City of Edmonds, a municipal corporation, the following described real estate, situated in the County of Snohomish, State of Washington, including any interest therein which grantor may hereafter acquire: The westerly 2 feet of that portion of 3rd Avenue South in Edmonds laying easterly of the south 48 feet of the easterly 400 feet of the north half of the northwest quarter of the northeast quarter of the northeast quarter of Section 26, Township 27 North, Range 3 East W.M.; EXCEPT the north 190 feet; and, EXCEPT roads. together with the right to make all:necessary cut or -fill slopes on the land of grantor's adjacent to the above -described real property in connection with the construction, maintenance or improvement of the above -described real property for purposes of a public roadway. DATED this day of 19 ,ow 1114-7,IA40-�Cl C7� got dp'�11 lo� ? ly f, .ACK__1\0W'LEDG_MENT IN A, REPRESENT,./k 7E CAPAG:Iare T Q 0 TA R cp 000 C=* 0 PUBLI� Snohomish $too WASA:- CVIC hat Bj r Thuesen the individuai(s) vnc to cxcc�!-,o th� ani� ?&novic--ged iz as the President __B�oi�nUhuesen, Inc. �F� . 70 `-e free 2c o-- �o- �he uses and purposes meniionc� i.i the instn—u-nent. 9/ N 0 R Y P UHUC FO�, 7 �i Z S E �'XIS�i!NCTON; q:iy P-1 Ic I Mv a,)Doin 71-11 Az . . .. . tment p - � �p S E P 13 1991. ENGINEERING 7 LU 7 U. U .J ui CC CO 4,0 7W "k V,41 S. IVA ST ONA VNRES 12M 7/ c7-0:� `z525-7— 771�4-445 t.L. 4 ool S..JO e4 AT 3 ST NAL IRES 12M 0 a NOTICE TO PERMITTEE AND/ OR OWNER El PARTIAL APPROVAL El VIOLATION N CORRECTIONS REQUIRED NO PERMIT - STOP WORK - REMOVE CONSTRUCTION OR OBTAIN El PERMIT AND MAKE WORK COMPLY WITH BUILDING LAWS. CONSTRUCTION IS NOT IN ACCORDANCE WITH "PROVED PLANS AND PERMIT - STOP WORK- MAKE EXISTING WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE IT. El STOP WORK - UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR. V;-A CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED. WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED. CONTACT INSPECTOR AND RECALL FOR INSPECTION. ARRANGE FOR APPOINTMENT. 0 C elA J4 AA:X 1AWWU,0 4�� W l 70 ,3. Al. /,,o THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR PENALTIES IMPOSED BY LAW MAY BE APPLIED. FOR INSPECTIONS CALL: 771-3202. El BUILDING DIV. V,.Az &P* - 0 PUBLIC WORKS ZINSPE!OR�� El FIRE DqT. uil I ur DATE EDMONDS 19 oKwt$ee4 -Im \-11) U gq BibRN THUESENINC., REALTORS 322 MAIN STREET - EDMONDS. WASHINGTON 98020 775-1953 STRE.L.. F11 May 13, 1991 Abel Curbing, Inc. P.O. Box 1862 Everett, WA 98206 Gentlemen: At our City Park Condominium project, 430 - 3rd Ave. So., Edmonds, number 4 parking stall near the gazebo measures only 8 feet in width. Some of the stalls measure 9 feet. Please make the appropriate change to meet city standards. Also, parking stall #9 has the number reversed so it looks like a number 6. Please let us know when this has been corrected. S i n c e r e I y , B T / j s N C . BjbRN U 0 U [�BE H INC., REALTORS 322 MAIN STREET - EDMONDS, WASHINGTON 98020 - 775-1953 'E F I L E May 13, 1991 City of Edmonds Engineering Department 250 - 5th Avenue North Edmonds, WA 98020 Re: City Park Condominiums 430 - 434 3rd Avenue So. Edmonds, WA Gentlemen: P/ M Rece, V WA Y 4.1U91 EN61"IFRING We have been asking for a Temporary Occupancy Permit and would appreciate it if you would submit 'to us your check list of things that have been approved and things that still have to be attended t o . Please call the undersigned so that we may pick up your check list at the counter as soon as possible. S i n c e r e I y , BJORXYHUESP1--,�INC /Thuesen, dent BT/js -7b A-1-14 /Z 4 0 IVA 4 .10-: 4-ll =Af / ��Z-pz A-0-f 4-c-- 1-2115,114V IAI ld!;r�vl o,= eplr ,.5- A.W IAI - ---------- C AA:1"r Z�L I * WRIMA M7 A) 4il,6 �-! if- K 14 L I 7-M-4) OW A 0 in IA in IA coo 0 C4 C4 V —i! A A A 04 C4 C4 e9 *4 all 0 C1 7 57 -5;Y-A!54� ',54V�,`O 1A) AWXV 0-- A( 6x -57rMS 7-1 4A-,Z� I Z/r/t/7Z/ AV" A4 -S /0. Q2.al r "e) vlu 0 IF-)9,4-7 r-Me1v Iz- OF- 7z2 Jlmlz� 57 z�. �;e-o4 :11,5 s-lza 2 e- 0 274 0 7-/- A, 770 n 7Z) 7-Z C1,01 12 TO- 27:51 IOOT- 71 ;o . 6e;7,,de-- 13 STN"EET FILE TO: Dick Mumma FROM: Ron Holland SU=: CITY PARK APARTMENTS JR -.;.A t APR 2 P[?-:R.MIT COUNTER 1. Telemetry from Stead & Baggerly must be hooked up per City of Edmonds requirements,* Must be hooked to 110 control breaker so if turned off, alalm' will sound at shops. 2. Generator must be hooked up correctly to accept City portable generator and motors are to be in right polarity. 3. Valve vault must be hooked up with proper drain to wet well and provided with a check valve that is accessible so maintenance can be performed in wet well. 4. Fence is to be constructed around electrical panels (61 in height with full gate opening on south side to allow access for maintenance). Must have 3' working space on sides and back from furthest extremity of electrical boxes. 5. Manhole lid on valve vault must be reset and mudded so as to allow no leakage around base and must be aligned with opening. PREVIOUS REPORT No 0 TO:- CASCADE GEOTECHNICAL, INC. 12911 N.E. 126TH PLACE (206) 821-5080 KIRKLAND, WA,&NGTON 1 980 - 34 FA,,&� 6)1-223-2203 E zz all 7:emxgq�?��! ATTN:- THE FOLLOWING WAS NOTED: IV AjAj D A T E�/ PROJE T �COCATION ------------ Z7� xl%,Ik - BLDG. PERMIT NO. OWNER WEATHER S611�41�-ll R tl:- TEMP. AT AM c E I v RD PM ENGINEER AIJR 3 0 1891 ARCHITECT ENGINEERING CONTRACTOR I/ < 50 'T�- x, 10-7 / � - 0!!!:�N a 75 -!06' eo .1.6 /37-,3 '13613 /Co 0 /39.3 / / '�-5 04 C- C) I I E S T C: (A FIELD PY I SA TA�-La�' REVIEWED BY ZI ", Gj� 00 y4 S'D 30 1 1 �'A'A � V0011 C00119 STREET FILE MEMO TO: Dick Mumma Building Official FROM: Gary L. McComas Fire Marshal F/y - , � C Yr - M January 17, 1991 SUBJECT: SECONDARY ACCESS FOR 29 UNIT APARTMENT AT Tj-b--3-R-D---A-V--E—NUE SOUTH 19"6c- The requirement. to provide a secondary access from Edmonds City Park is removed. As final grade was established in the complex it. was obvious that t.he grade t.ransition would be very difficult and several solutions were investigated. It is now apparent. that, there is no pract.ical solution. --- ::2- 2— �' GLM: be PROJECT TL 5 .............. PROJ. # ........................... CONTRACTOR .......................................... DATE.�� ................ WORKERS -ON SITE ......................................................................... ............................ -ST-Rit i 'FILE ...................................... E,QUIPMENT ON SITE ....................................................................... ............. WEATHER .................. TEMPERATURE ................................. DAILY ACTIVITY (AX/P.M.) L�r2 .......... ................ ....... ........................ o;jrAy/.r-yq-r y ................... .................. . . . . . r . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..... o ........................................... ........................................................................................ FOLLOW—UP TESTING ......................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CITY REPRESENTATIVE ..4141 . ........................... DATE/TIME ........... ............ PROJLOG/TXTFORMS PROJECT .......... PROJ. # ..................................... CONTRACTOR .............................. .............. DATE. I.q "JOL ...................... WORKERSON SITE ......................................................................... EQUIPMENT ON SITE ........................................... ............................. ........................................................................................ WEATHER .................. TEMPERATURE 'Pnq?� ....... o ............... o DAILY ACTIVITY.(A.M./P.M.) .............................................. 40 .. 4-4 4eV-e-. ffA�2�.. o"w ....0......................... —17' ........... o ......................... .............. o .... 72t A er... At ................................... 44 4?4 ........... o ................................. o. ......................................................... I . . . . . . . . . . . . . . . ... . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................. FOLLOW-UP TESTING ....................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . CITY REPRESENTATIVE ......... DATE/TIME.*/-.fo .................... PROJLOG/TXTFORMS, PROJECT.............. PROJ. # ...................................... CONTRACTOR............. i ............................. DATE.Z�.��.7R ................ WORKERSON SITE .................. I ...... ................................................ EQUIPMENT ON SITE ........................................................................ WEATHER X�W �. ................. TEMPERATURE ..................................... -DAILY ACTIVIT Y (A.M./P.M ........................................................ Po .4v .:P-4 ......... ................................................... ................ ................... .. . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .............................................. ............... o.. o. o ............................. o 0 ........................ o ......... ............................................................... o ......... 0 .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ FOLLOW—UP TESTING ........................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............. CITY REPRESENTATIVE I .............. DATE/TIME. PROJLOG/TXTFORMS 0 0 PROJECT AelS .............. PROJ. # ..................................... CONTRACTOR 7'±AJ.E�5� ................................. DATE. ................... WORKERSON SITE ......................................................................... ........................................................................................ EQUIPMENT ON SITE ........................................................................ WEATHER CLQJ9�r ................... TEMPERATURE .9P ..................................... DAILY ACTIVITY (A.M./P.M.) tm�� 13.0-1410 ...................................................... Z , 1'..Fo OF.-. —t�to. .......... ............... ............................ .......... ....... o ...... ...... ....... ........................................ .............. ... ................................... ........ t.� .................... .............. ........ L�Arn ....... o ................ .................... ..................... .. ......... "�` _"'� ............... ............................... ............................. .......... o ............................. . . . . . f . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . ........................................................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ao .... .................................. COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................. FOLLOW-UP TESTING ............................................................ I ........... ........................ 7 ...................................................... CITY REPRESENTATIVE ........... DATE/ T I ME. PROJLOG/TXTFORMS 0 0 PROJECT ............ PROJ. # .......... .......................... CONTRACTOR ......................... ................... DATE.14. �*�lb .................... -WORKERS ON SITE .......................................................................... EQUIPMENT ON SITE ........................................................................ ........................................................................................ E A T H E R fAf.asli. 45� ............ TEMPERATURE 45_!�� ................................... DAILY ACTIVITY (A.M./P.M.) .................................... 4�4 . I A41 �.. T XP% . .......................................................... .................... . 151 o ob zirp I ez "AD s; .............................................. ....................................... ................ ; .......................................................... * ............. ......................... o..00 .... o.o.o ................................................. ....... I ................................................................................. ........................................................................................ ........................................ ................................................ COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................... ! ............. J.g. ............................................ 6.0m. FOLLOW-UP TESTING ........................................................................ ......... . . .... .............. ... 'CITY REPRESENTATIVE -7 .................. DATE/TIME . ..................... .PROJLOG/TXTFORMS 0 0 iw tot? PROJECT, ................... T .............. PROJ. # ...................................... CONTRACTOR . 174WI4�* .............................. DATER� ................. WORKERS ON SITE .......................... I ................................................ ......................................................................................... EQUIPMENT ON SITE ........................................................................ ........................................................................................ ........... ...... TEMPERATURE ................................. WEATHER DAILY A CTIVITY (A.M./P.M.) ................................................. i� �lvkl- . f�lyprv.w+. 6"kel-SP. �< �V.. m je-:� ................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ FOLLOW-UP TESTING ........................................................................ .......................................................................................... CITY REPRESENTATIVE ................ DATE/TIME. ........... PROJLOG/TXTFORMS 0 . 0 PROJECT, ftrq. ................ ... PROJ.. # ...................................... . 'CONTRACTOR .................. ................... DAT E. ..................... 'WORKERS ON SITE.,,.6i ....................... o ................................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . EQUIPMENT,ON SITE .......... ................................................................ .................................... WEATHER ..................... TEMPERATURE ................................... DAILY ACTIVITY (A.M./P.M.) POW. ................................. ......... .......... . ........................................ .. �llos *ooT).V. Koo. h�. o po . . �oi ........... ............................................................... ......................................................................................... ............................................................................ . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ..................... I ............................ . . . . . . . . . . . . . . . . ... . . . . . . . . . . . ! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . ... . .......................................................................................... . . . . . . . . . . . . . . . . . . . . . . . .FOLLOW—UP TESTING ........................................................................ .......... I .............. .................................. .......... .. CITY REPRESENTATIVE ... DATE/TIME PROJLOG/TXTFORMS' PROJECT ................. PROJ. # ...................................... _T�Au u1sr-A CONTRACTOR .......................................... DATE.9 ................... WORKERS ON SITE .......................................................................... EQUIPMENT ON SITE...-i ............................................................. ........................................................................................ WEATHER j�Lf*�ol .................... TEMPERATURE ',9'66 ................................... DAILY A CTIVITY (A.M./P.M.) ......................................... .......... ow v;i.4 S -p o ................... .. Q'COD' OfN 0 -PD P11 P-4 P 5TA, ......................................................................................... �Ao 4r- M' -w &F p 1 0 p P -611:�_' -175' * DP41�_ ......................................................................................... A y P?� AT ............................. ........... ...................................................................... ................................................... ............................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . 0 "o . . 0 . 0 . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . .1 COMMENTS (CONVERSATIONS, FIELD PROBLEMS) .................................... ............. ........................................................................................ ........................................................................................ FOLLOW-UP TESTING ....................................................................... . . . . . . . . . . . . i . . . . . . . . .. . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . 0 CITY. REPRESENTATIVE ....... ...................... DATE/TIME o .............. PROJLOG/TXTFORMS 0 0 PROJECT PROJ. # ..................................... CONTRACTOR ................................ DATE.'� .................. WORKERS ON SITE ................................................................. EQUIPMENT ON SITE ........................................................................ ......................................................................................... WEATHER .................. TEMPERATURE ......................................... DAILY ACTIVITY (A.M./P.M.) ................................................ �op-WETIq-1 DI ..................... kq. ............................................................. ....... I ........................ o ........... o ............................................. COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ .................................................................................. FOLLOW—UP TESTING ....................................................................... ........................................................................................ CITY REPRESENTATIVE ... oo ....................... ..... DATE/TIME ................ PROJLOG/TXTFORMS-. 0 0 PROJECT A-P'T-s ................. PROJ. # ..................................... CONTRACTOR ................................ DATE.). ...................... WORKERS ON SITE ......................... ................................. EQUIPMENTON SITE ....................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . WEATHER* ........................... TEMPERATURE ........................................ I - 1550 DAILY ACTIVITY (A.M./P.M.) J.X L2 ........................................................ DlLy VJA-S K)c-)T ............... . ........................................................ 'TD 66- F-tLj-aD 016AC - VC40e(S iz) .................................................................... ('2 OULT Luto­ �F. g_C-_M - �,b .................................................. ID az,� D/uj 1-p Coe&tz ... ........... o . ....................... . .................................. .................................. ................................................. ................. N. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . o o . . o . . . . . . . . . . . . . . . 0*-.-. COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ .......................................................................................... FOLLOW-UP TESTING ........................................................................ 067- 6 ......... DATE/TIME ............ CITY REPRESENTATIVE .... ............. PROJLOG/TXTFORMS 0 PROJECT ............. PROJ. # ..................................... _n4a F-SF-"J ZO 5fffv':�e CONTRACTOR.......................................... DATE .............................. WORKERS ON SITE ...................................................................... EQUIPMENT ON SITE ........................................................................ WEATHER ..................... ..... TEMPERATURE ........................................ Pu'"p" STytnoO "t+ COSMAtG&FIO , DAILY ACTIVITY (A.M.1P.M.) .................................................. �j eA­'- -t Lt- �Z? ... 7 .57 . . . . . . . ��7) . . . . . . . . . . . . . . . . . . . ......... .. .......................... ................................... .5PS7 0 �jg ........................................................................................ T __D .................................. ..... .................................... ....... I ................................................................................... COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ................................................ FOLLOW-UP TESTING ....................................................................... ................................ CITY REPRESENTATIVE Z ............... ....................... I .......... zo�� 7D . DATE/TIME ....... V ................. . PROJLOG/TXTFORMS 0 0 P R 0 J E C T ............ PROJ. # ...................................... 4 CONTRACTOR ..T P44(�� .............................. DATE. ................ WORKERS ON SITE .................................................................... EQUIPMENT ON SITE ........................................................................ ........................................................................................ WEATHER..��Vj .................. TEMPERATURE ........................................ DAILY ACTIVITY (A.M./P.M.) ......................................... 1��o p))PF- - N�L;Ofz- 'rr­ejcw)c_ ��tel)r-'Roo . .0E. . pp-F---o lon-q ... ............... o ................ .............................. .............. ............................. 0 .......... r..ni�p .... ft, .................................. .. ............ .................. ......................... ........................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5q: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . ............... o ............................................. o .......................... COMMENTS (CONVERSATIONS, FIELD PROBLEMS) ...................... oo ............... o.. FOLLOW-UP TESTING ....................................................................... ......................... ....... ................................................ CITY REPRESENTATIVE .... ....... . .................... DATE/TIME ..... ............. PROJLOG/TXTFORMS E 0 P R 0 J E C T -A ........ ; ....... PROJ. # ..................................... CONTRACTOR ................................ DATE. .24 .&-r.90 ................. WOOERS ON SI-TE .......................................................................... ........................................................................................ EQUIPMENT ON SITE ....................................................................... ......................................................................................... WEATHER- 5ci."oq ................. TEMPERATURE q5 _6q ................................. .. ... ..... .... DAILY ACTIVITY (A.M./P.M.) IA�o ........................................................ fU�4,0 5fA-ttoO, POW S_fAl)af� .......... ..... Fj 7P� ............................................................. &Lo�- kjDT- 40RPAM4, Nic JJC4�A ex (A-0 A-( U-6 T-?-ruwtk 4 TOW ............................................. , u�; ................... ............... F-Da4g5t, dD6� Z ?-C 0 A f� 0 L(C, WT TZ) 6 6f T#[1, WA�U-�L !VAT&�, tA,— ............................................................ .... 0 ................ A� L) mo rzop ............................................... ............................... ........ QlR-;C pu-c r-i�l rz-,Xysp-tc� Asif�o wa .................................................................................... P4 cy. (f mom .............................. . . ... ....... .................................... o ...................................... .......... 4_ -7 A _0 4AW. LAA 9..Of�- S? c) . . ((:C4t�fAA .......................... ...... ......................................... 5.*. 7b PF;,fvDVrz- ............................................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . o . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o COMMENTS (CONVERSATION5, FIELD PROBLEMS) ................. ........ o .................. ........................................................................................ FOLLOW-UP TESTING ....................................................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . CITY REPRESENTATIVE ................. ............ DATE/TIME ..... ................. PROJLOG/TXTFORMS7 P R 0 J E C T ............. PROJ. # ................................. CONTRACTOR ............................. DATE. ................ WORKERS ON SITE .......................................................................... EQUIPMENT ON SITE .......................................................................... WEATHER ........................... TEMPERATURE ........................................ DAILY ACTIVITY (A.M. /P. M. j. P -ci o t -, 4 sacA 6.,fz- Fu �-v-, s-r(_y-rto k . ............................... ............................. .................... .................... mHm. z .............. 1 (�r ",05-t 6-E PL,,u_jd) 44 r w �C) ... W-,qfey:. .. ......................... ............. ........... ........................................... .................. ................................................................................... �. 6 . . , . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COMMENTS (CONVERSATIONS,'FIELD PROBLEMS) ................................................ FOLLOW-UP TESTING ....................................................................... ........................ ... ...................................................... CITY REPRESENTATIVE ......................... DATE/TIME ....................... PROJLOG/TXTFORMS 0 I�L- CITY OF EOUVIONDS 250 51h AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES 6 "T"EET FILE H March 25, 1986 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR Mr. Jerald C. Hall 4437 Lake Washington Blvd., #102 Kirkland, WA 98033 Dear Mr. Hall: SUBJECT: 430-3RD AVE. S. - ACCT. #102-11100 1 received your letter dated March 18, 1986 requesting 'the balance of your water bill be waived. I must inform you that I cannot allow this at this time. The water must be paid for if it goes through the meter unless there are unusual circumstances, such as the City or a contractor hired by the City breaking your pipes. If you have any further questions, please feel free to give me a call at 771-3202, extension 296. Sincerely, BOBBY R. MILLS Superintendent of Public Works BRM/ml cc: Utility Billing 4, BRENA DT MARCH DT- PUBLIC WORKS 0 PLANNING PARKS AND RECREATION ENGINEERING E I I I El 4437 Lake Washington Blvd., #102 Kirkland, WA 98033 March 18,� 1986 Edmonds Water Dept. Edmonds, WA 98020 Gentlemen: Enclosed is my check in the amount of $100 to apply to account 102-11100. 1 am the owner of the house, but it is rented. Apparently around Christmas time a little - used downstairs toilet was left running. The problem was not detected and corrected until you notified the tenants in February of an appa"rent leak, which you assumed to exist because of the unusually high meter reading. I ask that you waive the balance of the bill due to the unusual- circumstances. I would point out also that the toilet which had been left running empties into a septic tank, not into the sewer... so no additional bur- den was placed on sewage treatment facilities. Thank you for your consideration. Very truly yours, J I dZC�. �H a I I jch/nah RECEIYEQ MAR 0 19K) Punic %ORKS CITY OF EDMONDS-UTILITY BILLING ACCOUNT NUMBER 100-09350 102— 1 loo SERVICE ADDRESS 430 3R() AV S MA G NAD A I D Q_ r— MLR E I E A NS G S TELEPHONE METERSIZE� 3/4 NO. OF UNITS SEWER CHARGE 14.91 WATER BASE I> CONNECTED YES SUPPLIER > S CODING � A W U RAE DTOS 1 o% METER NO. 2994 LOCATION DATE READ CONS. NOTE DATE READ CONS. NOTE pp e 910 613 11INn R C, Lulf." _2 I N. ........... z U OF EDMONDS Permit No. L" COMMUNITY SERVICES DEPARTMENT FILEIssue Date RIGHT-OF-WAY CONSTRUCTION PERMIT A. Owner: 2C �z B. 0 Contractor: LA—) Naple Na e —2— M�ihn Address ailing.�,dd Ci y-f City S t ite" Zip City State zi'P' State License Number 'Telephone Number C. *Address or Vicinity of Construction: 14 --� C) Ve Type of Work *to be Done: L , 4ze D. 0 Work in Connection With: El Sub or Plat El Single Family 1:1 Commercial Multifamily E. 0 Pavement Cut: P Y El N F. 0 Size of Cut: 2- X /0 APPLICANT TO READ AND SIGN City. Pr �ects:. 01 0, Utility INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit, THE CONTRACTOR IS RESPONSIBL ' E FOR -WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for.isstiance to the applicant. e A 24 hour notice is required for inspection; Please call Engineering: 771-3202 9 Work is to be inspected during progress and at completion. o Restoration to be in accordance with City Code. o Street to be kept clean at all times. o Traffic Control to be in accordance with City regulations. A All*street-cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. SignaturEj;:����- Date: Ovrn�r or �ontractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: . S�2_4 PERMIT FEE: 30 Time Authorized: Void after— S40 —days. Restoration Fee: Special Conditions: &A Receipt No.: Fund 11] Fee: Street Cut Dimensions: s RELEASED BY: Yh Date 1;WJ0 INSPECTED BY Date I NO WORK TO.BEGIN PRIOR TO PERMIT ISSUANCE 1, . ­­ I . I '' I. . .. Eng. Div. Maich 1989 FIELD INSPECTION NOR (Fuqn?l I I - Route copy to Street Dept.) Comments: 9-17 -9D Diagram: CONTRACTOR CALLED FOR INSPECTION Partial Work Inspection by P. W.:, Work Disapproved By: FINAL APPROVAL BY: 0 YES Date: Date: 0 NO Eng. Div. July 1985 CITY OF EDMONDS' ASSET INFORMATION SHEET STR, EET FILE PROJECT NUMBER �00:) S 0 9 PURCHASE ORDER NO. PURC HASE ORDER DATE PROJECT COMPLETION DATE 2, �m COST COST B.A.R.S. ACCOUNT,NO. L 000 - 01 3!15 00' XV7-� ESTIMATED LIFE- INITIATEDBY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY VERIFIED BY .0j.,APRECIATE MONTHLY DEPRECIATION AMOUNT PROCESSED ANNUAL DEPRECIATION AMOUNT BATCH NO. G.L. ENTRY - REFERENCE DATE INITIAL ktnp DEPARTMENT FILE PURCHASE ORDEFI.NO. PROJECT NUMBER' PURCHASE- ORDER DATE' PROJECT COMPLETION DATE COST COST - .A. Z -R,.S. ACCOUNT NO. .,ESTIMATED LIFE -W�'v Is INITIATED BY, DATE APPROVED BY **SUB -MIT ASSET INFORMATION, SHEET WITH FINAL�'PAYMENT�R EQUEST *SLIBMIT ASSET INFORMATION' SHEET UPON -CLOSE OF PROJECT ACCOUNTING ONLY a --DEPRECIATE VERIFIED BY ,MONTH LY-DEPREC IATION AMOUNT PROCESSED ANNUAL DEPRECIATION AMOUNT BATCH NO. G.L.ENTRY "REFERENCE, DATE top INITIAL DEPARTMENT FILE ASSET INFORMATION SHEET ASSET NO. ADDITION, TO ASSET NO. �5 ZOO (oO 9-- 30 -CID DESCRIPTION SERIAL NO. LOCATION DEPT.'NO. (A, PURCHASE. ORDER NO. -.PROJECTNUABER PURCHASE -ORDER DATE. PROJECT COMPLETION DATE COST COST B.'A.R.S.'ACCOUNT NO. 000 0 1 .-SL/ ESTIMATEDLIFE L INITIATED BY DATE APPROVED BY **SUBMIT ASSET INFORMATION'SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET, INFORMATION SHEET UPON CLOSE OF.PROJECT ACCOUNTING ONLY VERIFIED BY EVDEPRECIATE MONTHLY DEPRECIATION AMOUNT PROCESSED ANNUAL DEPRECIATION AMOUNT BATCH NO. G.L., ENTRY REFERENCE DATE' ..INITIAL,. DEPARTMENTFILE CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT 8 C) 00 Public Works a Planning a Parks and Recreation a Engineering June 15, 1992 STREET FILE Bjorn Thuesen 432-Third Avenue South Edmonds, WA 98020 LAURA M. HALL MAYOR PETER E. HAHN DIRECTOR Dear Resident: On June 12, 1992 you were notified of a possible water leak in the water system. Our most recent reading of your water meter indicates unusually high consumption and/or a current water leak in the system. Please check for leaking faucets, toilets, pipes etc., as no billing credit is allowed on these items. If you have any questions regarding this matter, please call Utility Billing after you receive your billing statement at 771-0241 or Water Maintenance, 771-0235, extension 349 or 347. Sincerely, Q.'� ��/"o Ron Holland Water/Sewer Supervisor RH/l k FOLLOWUP/TXTWATER 0 Incorporated August 11, 1890 o ".1w CITY OF EDMONDS, C �CONSTRUCTION PERMIT APPLICATION OWN ER NAME/NAME OF BUSINESS BJORN TRUESEN, INC. cr UJ z 3.1 MAILING ADDRESS -%TR9: T 1: h2 main St. I I 0 - CITY TELEPHONE NUMBER Edmonds 775-1953 NAME D. A. 11-lermand Co. LOU ADDRESS 11416.Slater Ave. N. E. < CITY, ITELEPHONE NUMBER Kirkland 1827 -2763/774-1953 NAME BJORN TIRTEVEN, INC. Cr ADDRESS 0 i22 Main St. cc CITY TELEPHONE NUMBER z -0 Edmonds 775-1953 STATE LICENSE NUMBER BJORNI*225BZ Legal Description of Property - include all easements �sqhow below or qtpc�jwo qppiesj,_ U0 USE MIT ON E Z ZONE NUMBER 2. J OB JOB ADDR!' ADDRESS 3rd Avenue South PVT, LEGAL DESCRI T1 CHECK SUBD NO. LID NO. z-: S9 142,9 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP APPROVED BY k'r EXISTING A REOUI RED DEDICATION PROPOSED-X'.V RIGHT OF WAY CONSTRUCTION PER MIT REQUIRED W STREET USE PERMIT REQUIRED Uj z SEE ENGINEERING MEMO DATED REVIEVkBY (5 z REMARKS.,� 4 / �we, METER 7,1ZE BUILDING SUPPV SIZE FIXTURE UNITS YZ Uj REMAR'V "'�c 0 SIGN AREA ALLOWED PROPOSED ENV. REVIEW COMPLETE EXEMPT 8 NO Gz - 9127, SHORELINE# VARIANCE OR CU PLANNING REVIEW BY DATE SETBACKS - FEET t FRONT SIDE REAR HEIGHT( LOT COVERAGE L4 � L� 1?1 zz HFMARKS 5 (L /50,140 CHECKED BY 1 TYPE OF CONSTRUCTION V- / /-/,P, 1 CODE HEIGHT 06 , SPECIAL INSPECTOR REQUIRED AREA OCCUPANCY GROUPg/ OCCUPANT LOAD 0 YES C NO REMARKS PROGRESS INSPECTIONS PER UBC 305 z a ID _�LAN CHECK FEE BUILDING 102.720 PLUMBING MECHANICAL GRADINGIFILL STATE SURCHARGE ENERGY CODE ----- ----- PLAN CHECK DEPOSIT TOTAL AMOUNT DUE ZR f-3 ATTENTION APPLICATION APPROVAL THIS PERMIT AUTHORIZES This application is not a permit until ONLY THE signed by the Building Official or his WORK NOTED Deputy; and fees are pajd, and recel t is INSPECTION acknow: �Idged In spacrrovided. DEPARTMENT CITY OF OF5411 GNATURE fiATEX EDMONDS 771- Kftffio V "-6ATE ATT-Irzfq -KO N -3202 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor 102-87 -7. USE _7'PERMIT u 'Z1T`Y60r--E!DM0NDS ZONE NUMBER .9 ()/1 ftz CONSTRUCTION PERMIT APPLICATION job OWNER NAME/NAME OF BUSINESS ADDRESS 4301- 3rd Ave. South 404 BJORN THUESEN, INC. LEGAL DESC CHECK7SION NO. LID NO. Cr UJ MAILING ADDRESS Z �7" g2 30' 322 Main St. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP CITY TELEPHONE NUMBER APPROVED BY EXISTING REQUIRED DEDICATION Edmonds 775-1953 PROPOSED 4 NAME Z cr 1_. D. A. IAER�LhNS CO. RIGHT OF WAY CONSTRUCTION PERMIT REQUIREDI/ LU -,A LOU ADDRESS STREET USE PERMIT REQUIRED LU Z 0 11416 Slater Ave. N.E. R VIEW BY Z U SEE ENGINEERING MEMO DATED LU qCITY TELEPHONE NUMBER :1 Kirkland 827-2763/775-1953 REMARKS NAME BJORN THUESEN, INC. ADDRESS 4 AU�:,C .0 le. 0 322 Main St. METE) IBUILDING S PPLY SIZE CITY TELEIPHONE NUMBER /y IFIXTURE UNITS LU 4 oz Edmonds 7775-1953 REk4ARKS L) STATE LICENSE NUMBER BJORNI*225BZ SIGN AREA ENV. EVIEW D B Nb�a Legal Description of Property - include all easements PROPOSED COMPLETE EX MPT (�A (show below or attach two copies) Z SHORELINE# The easterlv 4W ft. of north half the 2. of northwest quarter of the northeast quarter of the northeast VARIA CE OR CU PLANNING REVIEW BY _cniarter of Section 26, Townshiv 27 North. Ran2e 3 East, W.M.; 1'X =, the 190 feet; W, north and, SETBACKS — FEET HEIGHT LOT CO <0 roads. D. VEFAGE L4 Z FRONT SIDE REAR- rk Lrn Z L�::;, REMAHK5 Fm x RCC__T 262703-1-010-0002 0. [i] NEW Ex RESIDENTIAL PLUMBING A ADDIALTER 1:1 COMMERCIAL MECHANICAL REPAIR APT. BLDG. SIGN r EXCAVATE FENCE CHECKED -BY- 6q, TYPE OF CONSTRUCTION CODE HEIGHT DEMOLISH OR FILL El (—x—FT) Ml(� I �;A e(o I /, �, ? _y_ CARPORT GARAGE swim SPECIAL INSPECTOR AREA OCCUPANCY OCCUPANT REMODEL POOL REQUIRED � GROUP k_1 LOAD EWOOD STOVE/ RETAINING WALL/ 10 YES., - C NO ] INSERT RENEWAL REMARKS ROCKERY Z ;o PROGRESS INSPECTIONS PER UBC 305 NUMBER OF STORIES NUMBER OF LU mn a DWELLIN ca 2 1UNITS �Bldg. C) 7 0 2 NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) L &P Multiple RM 2406 am . I VALUATION FEE PLAN CHECK FEE BUILDING 166 17oo )1? 7 1�7 PLUMBING ��Klf 41Z A51"I 7- MECHANICAL PsTu-mm- 6:)w,4wf �0270/3 7 Wnfif)r 'Plegm This PeTrnit covers work to be done on private property ONLY. GRADING/FILL Any con�jructip D _Skn the publ[Q domain (curbs, sidewalks, driv(Way`Sr:j�j��60eS,, _etC.f.M ItIfequirUep"irateTbrmission. STATESURCHARGE Permit Application: 180 Days ENERGY CODE Permit Limit: 1 Year - Provided WorN is Started Within 180 Days '�Applicant, on behalf of his or her spouse, heirs, assigns :,n successors in interest, agrees to indemnify, defend and hold ow harmless the City of Edmonds, Washington, its officials, �2 employees, and agents from any and all claims for damages of < whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of. this permit shall not be deemed to PLAN CHECK DEPOSIT M/7-L/ 0 modify, waive, or reduce any requirement of any city ordinance :r nor limit in any way the City's ability to enforce any ordinance TOT L AMOUNT DUE provision." I hereby acknowledge that I have read this application; that the Information given is correct; and that I am the owner, or the duly ATTENTION APPLICATION APPROVAL authorized agent of the owner. I agree to comply with city and THIS PERMIT state laws reTia Ing construction; and In doing the work authoriz- AUTHORIZES This application is not a permit until ed thereby _ person will be employed In violation of the Labor ONLY THE signed by the Building Official or his Code of t State of Washington relating to Workmen's Compensa- WORK NOTED Deputy; and fees are paid, and receipt is Al tiQn In S I CO. I NSPECTION acknowledged in space provided. IGNA R ENT) DATE SIGNED DEPARTMENT �Aant 9/27/89 CITY OF OFFI GNATURE ATE EDMONDS RELE*D DATE At ION 771-3202 VUNWLAWFUL IT TO USE OR OCCUPY A. BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspectord, 1,1 A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK — Owner GOLD — Assessor 102-87 USE E IMIT US NE NUMBER Zo ZONE CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION joe FADDRESS 4J6-- 3rd,Ave. So. OWNER NAME/NAME OF BUSINESS BJORN THtIESEN, INC. LEGAL DESCRIPTI15 CHECK SUBDIVISION NO. LID NO. 30: MAILING ADDRESS 322 Main St. PUBLIC RIGHT�F WAY PER OFFICIAL STRE . ET MAP. TESCP APPROVED BY CITY TELEPHONE NUMBER Edmonds 775-1953 FXIST REQUIRED DEDICATION PROPOSED L' W L) NAME D. A. Ilermans Co. RIGHT OF WAY CONSTRUCTION PERMIT REQUIRE STREET USE PERMIT REQUIRED:' LL ADDRESS 11416 Slater Ave. N.E. REVWW BY Z SEE ENGINEERING MEMO DATE LL 2y/w/ /M CITY Kirkland TELEPHONE NUMBER 827-2763/775-1953 REMARKS NAME BJORN THUESEN, INC. cc 0�_ ADDRESS 322 Main St. MEJER IZE BUILDING SUPPLY SIZE e2 FIXTURE UNITS CITY __rT7EELEPHON;E NUMBER 01 Edmonds', 775-1953 RqM)AR S ID/ p STATE LICENSE NUMBER BJORNI*225BZ SIGN AREA PROPOSED ENV. REVIEW COMPLETE i EXEMPT ADB NO % (OG - e5 0 Legal Description of Property - include all easements �how below or attach two copies) ie easterly 400 ft. of 11orth half of thp northwpst SHORELINE# quarter of the northeast quarter of the nortbeast qua ter of Section 26, Township 27 North, Ram-e 3 L'L cc 10 W VARIANCE 1. OR,CU PLANNING REVIEW B� DATE East, W.M.; EXCM the north 190 feet; and, EXCM- roads. SETBACKS �FEET I 1.5 , 1 FRONT SIDE or REA I HEIGHT LOT COVERAGE Z Z 2,62703-1-010-0002 REMARKS A�T ;20�� NEW F_X] RESIDENTIAL i PLUMBING 7 Li ADDIALTER LJ COMMERCIAL El REPAIR APT. BLDG. EXCAVATE DEMOLISH OR FILL CARPORT REMODEL El GARAGE L MECHANICAL 0 SIGN FENCE I— x —FT) swim POOL P, r &A) D giis Q9_0 CHECKED Iq TYPE OF CONSTRUCTION V- / H9, CODE SPECCAC IN ' SPECTOR PEQUIR�D_, A3,YES%­1 0 NO AREA JOCCUPANCY GROUP WOOD STOVE/ 7 RETAINING WALL/ INSERT ROCKERY Ir. RENEWAL REMA \PKS— PR60'*tESS INSPECTIONS PER LIBIC 305 &WC1VCk# NUMBER OF STORIES. 2 NUMBER OF DWELLING 1UNITS (Bldg. D) 12 NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN) MultiiDle RM 2400 2i/go' OCCUPANT LOAD D VALUATION FEE PLAN CHEQK FEE A BUILD ING 44o,-4oi' U1Y1r1h07 P�UMBING MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL Any constructior.i on the public domain (curbs, sidewplks, driveways, marq . uees, etc.) will require separate permission. _ STATE SURCQTkj Permit Application: 180 Days Permit Limit: 1 Year - Provided Work is Started Within 180 Days ENERGY CODE k-Q,,R �4� "Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, 2 employees, and agents from any and all claims for damages of cc whatevbr nature, arising directly or Indirectly from the Issuance o f this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEP2!� 0 modify,. waive or reduce any requirement of any city ordinance x nor limit In any way the City's ability to enforce any ordinance TOTAL AMOUNI provision." I hereby acknowledge that I have read this application; that the APR_GVAL Information given is correct; and that I am the owner, or the duly &)lff-E N Tt6'K\ A AIPPUGAT16N authorized agent of the owner. I agree to comply with city and state laws regulating construction; and In doing the work authoriz- THIS PERMI I T AU gNpapj%8aAn is ncA�a,.�ermit until ed thereby, no personyA�l be employed in violation of the Labor Zff,Es�� ;,Igned by the Building Official or his Code of t,?fe State of Whshington relating to Workmen's Compensa- WORK NOTED Deputy; an.� fees are pai4ar�0 receipt is tign.l. wrance.. N6ECTIA aokn'bwfddbed in Oace provided. SIGNATO 0 NOKE-PrWAGENT) DATE SIGNED DEPARTMENT res L2, wo�/1121_"L ident 9/27/8 .—*a CITY OF ATURE EDMONDS 4:4 0 771 _j�6,2 tS T: DAT NTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE (7, /< UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. PINK Owner GOLD — Assessor 102-87 USE 'WRRM IT CITY OF EDMOMS ZONE NUMBER CONSTRUCTION PEAP417.r. 4?.RLICATION joB ADDRESS 430 3rd Avenue South #A OWNER NAME/NAME OF BUSINESS A BJORN TRUESEN, INC. cr -E LEGAL DESCRIPTI CHECK 51301VISION NO. LID NO. MAIUNG ADDRESS z -322 Main Street PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP APPROVED BY CITY TELEPHONE NUMBER Edmonds 775-1953 EXISTING REQUIRED DEDICATION PROPOSE NAME D. A. Ilermans Go. RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED STREET USE PERMIT REQUIRED: L) ADDRESS LU 11.416 Slater Ave. N.E. SEE ENGINEERING MEMO DAT Rkyl�w BY M CITY TELEPHONE NUMBER Kirkland 1827-2763/775-1953 REMARKS NAME BJORN TflUESEN, INC. cc ADDRES�§,.' 0 a22 Main Street CC CITY TELEPHONE NUMBER o' Edmo.nds 775-1953 STATE LICENSE NUMBER BJORNI*225BZ Legal Description of Property - include all easements (show below or attach two copies) z I The easter v 400 ft. of north half of f-I-In ninrthwpa Q. quarter of the northeast quarter of the northeast EC quartpr of St-�.rion 20, Tnwnship 97 Marth RanLle East, W.M.; UCCEI-T the north 190 feet; and, IWEPr L< roads. LU /Kc 7 #r 262703-1-010-0002 NEW RESIDENTIAL PLUMBING ADDIALTER COMMERCIAL MECHANICAL REPAIR APT. BLDG. SIGN EXCAVATE FENCE E] DEMOLISH OR FILL (—x—F CARPORT swim REMODEL 0- GARAGE POOL WOOD STOVE/ r7 RETAINING WALL/ INSERT ROCKERY RENEWAV CL IES NUMBER OF STOR j NUMBER OF lu 2 tQWE LING uNif k BldA.A)22 `��"8 NATURE OF WORK TO� BE DONE (ATTACH PLOT PLAN) Multiple RM 2400 -1117 9 W z 0 z W METER S9 ii BUILDING SUPPLY SIZE IXTURE UNITS Cc 2 REMARKS 1< SIGN AREA ALLOWED PROPOSED ENV. REVIEW COMPLETE EXEMPT ADB NO. � SHORELINE # VARIANCE OR CU PLANNING REVIEW BY D�V I- �-- L4 SETBACKS - FEET [�MEIGHT, z LOT COVERA�� FRONT SIDE REAR z REMARKS t —7 CHECKED r"YjPE�PAQNSTRUCTION -[CO —DE HEIGHT Li 10 /-7/%, SPECTOR AREA OCCUPANCY OCCUPANT _91EOYIR�D GROUP LOAD � n YJM U NO RO — I REMARKS PROGRESS INSPECTIONS PER LIBC 305 z Irl . — - ---- M PLAN CH ECK FEE T -Y BUILDING 3 PLUMBIING,-�— Q C A MA Asmir/W 6WA&r 67112.70137 MECHANICAL This Permit covers work to be done on private property ONLY. GRA155ING/FILL Any construction on the public domain (curbs, sidewalks, STAT'E­SUACH-ARGE driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit .. Limit: I �ear - Provided Work is Started Within 1 1 80 Days ENERGYCODE --57-Appirca-4, behal'rbf his" -or her spouse, heirs, assigns and ssors in,,in , , - �A��e8 . te�-Qst_ agreeNt% indemnify, defend and hold tmless t:heNCity—of-�-Edm6n 5n s, Washington its officials, 2 employees, and agents. from any and all claims for damages of x �z whatever nature, arising directly or lndir6ctly,from the issuance E of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT D j modify,, waive or reduce any requirement,of� any city ordinance D I r: nor limit In any way the City s ability to enforceany ordinance -pr TOTAL AMOUNT DUE vv�imon." I hereby acknowledge that lihave read this application; that the information given is correct; and that I am the owner, or the:duly ATTENTION authorize-d agent of the owner. I agree to comply with city and .state law , s regula ng construction; and in doing the work,au , thoriz- THIS PERMIT AUTHORIZES ed thereby, no -Irson will, be employed in violation of the Labor ONLY THE Code of t�he eof Washington relating to Workmen's Co.mpensa- WORK NOTED jj�nlnsu r INSPECTION DEPARTMENT SIG7NATnU T) OATE SIGNED ident 9/27/89 9� �CITY OF EDMONDS 771 3202 STRUCTURE PROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. 102-87 — PS00 1//v7,q APPLICATION APPROVAL This application is not a pe�mi t until signed by,Ahe Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. 0 DVE /F�L;401GNATURE �RELEASE BY- DATE 7 Aw, , �-- - �;--b ORIGINAL — File YELLOW — Inspector PINK — Owner GOLD — Assessor v - - A BUILDING A P WORK A In- C R LE S S led 0 'Af-2"N! % � 7 --6 -t7 i �2' i U E !'R L --E �Ml' - — W� —'Zcvz�' �. ON OF SECTION 26, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., SNOHOMISH COUNTY, WASHINGTON ------------ - - 0 Tl� 9 LF CEDAR FENCE PER DETAIL BOLLARD SEE DETAIL EX G BAGE JT Al _'r SHEL TER OPAGL 0 t'� CONC FISERC�ASS OVEW�()W Slo"GL —El. EX �6'-60' __-�VALVE VAULT E�, :1;"IFL !E-."': ': (1, -,W) R I v 'E5�- 9- JE-46�' 79 ��4' IL= -E 2 1,2 �' 1. 2"FM— L PLR.All[N SF�l EX. ASPHALT EX ASP.ALT EX CONDO 13ULDING / le, A sl UO3 BY Nl- If �:ER I t G CALL 2 BUSINESS DAYS BEFORE YOU DIG 1-800-424-6666 LS #5 SITE PLAN SCALE: 1"=5' EX. BU)G #432 5 2.5 0 5 10 GALV. FENCE RAIL SUPPORTS F(SIMPSON OR EQUAL), TYP. TOP RAIL JOINTS 0 2x4 CEDAR TOP RAIL ------ AT POS T. TYP 2�4 CEDAR RAILS (2) j (TYP FINISHED 0 ../--PT FENCE POSTS. SI DE .1 MAX SPACING � 6'-O*OC '2*0 CONC SONOTUBE FTG (fc 2.500 PSI) I I c� E� : -1 AT CONC. ' 2 CLR 9. m z 2" CLR (TYP > cl VERT EO SP. (fy 40 KSI) u w i.L ELEVATION SECTION I FACE FINISH SIDE TOWARD ADJACENT RESIDENCE 2 A TWO COATS CEDAR TONE PRESERVATIVE SESL ALL wOOD Wl TH 1;0 3 FA TEN FENCE MATERIALS WIT11 COATED DECK SCREWS /"'�l DETAIL - WOOD FENCE do NOT TO SCALE U) rn rn — ROUNDED CONCRETE CAP — 4' GALVANIZED IRON PIPE z TO BE FILLED WITH CONCRETE 0 AFTER INSTALLATION AND PAINTED SAFETY YELLOW Z U-) z oFn , < rn z FIN I SH 1,PAC:- 0 w LL Z LU 0 oz 15" DIAMETER CONCRETE F- LL LU FOOTING, CAST IN PLACE LL RECEIVED 4'-6' JUN 29 201Z DEVELOPMENT SERVICF.� NOTE, COUNTER ( DAWN MODEL BOS-4X-66RY WITH J-HOOK CAP (OR APPROVED S—E 1 5' EQUAL) MAY BE SUBSTITUTED FOR BOLLARD FABRICATED ON G. LA SITE. SUBMIT PRODUCT DATA SHEET FOR REVIEW. �E N/A 0 SHEET ,/ �2 DETAIL - FIXED BOLLARD . . . . . LS5-F NOT TO SCALE OF SHEETS JOB -/i2S 1-\14C 5 NO. EgGA-304 FIELD VERIFY LOCATION AND DEPTH OF EXISTING SEWER PRIOR TO CONSTRUCTION. INSTALL NEW 48" MH TYPE X WITH TOP SLAB, MH RING AND COVER TO MATCH EXIST. GRADE. FORCE MAIN INVERT TO BE 0.10' INSTALL 90* BEND EXIST. 5' CHAIN LINK FENCE ABOVE SEWER INVERT AT MANHOLE EXIT. WITH BLOCKING EXIST. POWER POLE \,�, � TEMPORARY CONNECTION 010e� SEE NOTE 8 BELOW. 30' PATCH PAVEMENT FOR INSTALLATION OF NEW FORCE MAIN. EXISTING >0- ASPHALT TO BE CUT IN A NEAT LINE AND TACKED BEFORE PATCHING. PATC TO MATCH EXIST. SECT N��. 1Z MINIMUM 4" CRUSHED ROC 2" ASPHALT CEMENT CLASS B. 165 LF. 4" PVC 51 FORCE MAIN ___� ,70 LF. 4" PVC FORCE MAIN EXIST. 2t ROCKERY TO BE 'REPAIRED AS REQUIRED /ASPHA/LT DR/IVE FM M M IN. EXIS ASPHALT DRIVE-4 EXIST. HOUSE EXISTING G AVITY LINE TO BE PLUGGED AT\tp APPROXIMATE LOCATION BOTH MANHOLES AND tp EXIST. SANITARY SEWER ABANDONED IN PLACE. SEE GRAVITY LINE NOTES 11 AND 12 BELOW. EXIST: 6' WOOD FENCE TO BE REPAIRED AS REQUIRED - i L A , / , / / / . /�� 1 7' _7` APPROXIMATE LOCATION EXISTING 4" C.I. FORCE MAIN CONNECT NEW 4" PVC FORCE MAIN TO EXISTING LINE. INSTALL BEND WITH BLOCKING AND FITTINGS FOR CONNECTION AS REQUIRED. FIELD VERIFY LOCATION AND INVERT OF EXIST. LIFT STATION EXISTING FORCE MAIN. VEHICLE ACCESS TO TOP ELEV. 19.37' BE MAINTAINED AT ALL TIMES. LEGEND: NEW 4" FORCE MAIN _SS— EXISTING SANITARY SEWER <:=P EXISTING SHRUBS EXISTING SANITARY SEWER GRAVITY LINE FORCE MAIN INVERT TO BE 0.10' ABOVE GRAVITY LINE INVERT AT M.H. EXIT--, 0 4" FORCE MAIN PROVIDE CHANNELING TO 6" DEPTH EXISTING GRAVITY LINE TO BE PLUGGED 48 INCH MANHOLE DETAIL N.TS. EXISTING ROCKERY EXISTING MH TOP ELEV. �fl.32' INV. ELEV. 39.67' PLUG EXIST. 4" C.1.'FORCE MAIN AT MH. Ui W zi W Ir ro +11 0 WALNUT ST. HOWELL WAY GENERAL NOTES: 1. All construction shall conform,to the "1984 Standard Specifications for 8. The existing sanitary sewer system is to remain in operation at all Municipal Public Works Construction" and standard plans as adopted by the times. Tenporary connections are to be made as required to keep system City of Edmonds, and, any requiremnts established, at City,hearings on in operation. Any damage which occurs as the result of the system not this project'.: being kept in operation shall be the Contractor's responsibility. 2. The Contractor shall notify the.City of Edmonds Department of Public I I 9. Existing house and foundation to be protected during construction. Any Works 24 hours prior to and'�uirin�g work o btain all require d. permits I I damage shall be fully repaired by Contractor' prior, to construction. Corttiactor to. obta ' in approval of and coordinate with apartment owner prior to construction. 10. New 48-inch manhole to be channeled to a minimum 6-inch.depth. 3. The Contractor ' shall notify'the,C ' ity of Edmonds Department of Public 11. Field verify that side sewer on existing house is not connected"'to Works prior to backfilling',utiliLies. gravity line to be.abandoned prior to abandoning that line. 4. Existing underground facilities have been shown on these . drawings for the 12. Plugging of sanitary sewer lines to be with non -shrink grout to a�minimum purpose of ' assisti.nq the Contra6tor in locating said facil 14t. ies-in the 12-inch penetration that will assure a watertight and leakproof seal. field. The. Contractor shall betesponsible for checking I actu ' locations ql in the field, and checking with appropriat& agencies,tfiat'may have underground f aicilities within the project limits. The Contractor shall be solely responsible for'Any danage to underground facilities resulting from his operations.' 5. A copy of these'approved plans nest be on the job site whenever I V gz.' construction is in progress. FEB 18 1988 PRINTED 6 A1.1 shrubs/trees that are disturbed by construction shall be root balled prior to.removal and stored on property. Replant trees and shrubs equal ENGINEERING FEB 17 M to existing conditions on site prior to work or relocate as directed by the owner. M& MOOLOON a ASSOOM 7. All pipe and fittings shall be AMM D2241 SDR 26 PW 1120 pressure pipe, Class 160 with rubber gaskets. Force main shall be installed with 18-inch.'minimum cover except as noted Blocking on plan. on all f ittin s to hav�e minimum olf 2, cubic feet of concrete poured against undisturbed soil with,3/4-inch anchor bolts to resist resul , tant forces. Bedding of "Flexible SANITARY SEWER PLAN the pipe shall conform to Section 7-10.3 (09) B, Pipe," which requires 3/8-inch minus sand/gravel mixture placed to a depth of 4 inches FOR under the pipe, -and, extending 6 inches over the crown of the pipe. ROBERT -CASTEEL IN PTN. NEI/4, NEI/4, SEC.26, T.27N,R.31E., W.M. EDMONDS, WASHINGTON 37/� 4:7. Reid, Middleton & Assodates, Inc. _J 0 Engineers 9 Surveyors e Plonners 121 5th Ave. N., Suite 200, Edmonds, WA DRAWN CHECKE DATE FIELD BK. CALE FILE NO. 02-87-121 i W. C. J. S. AN. '88 599/38 1 20' 1 SHEET OF I LAYOUT LEGENP TgAW�5FORMEK5 r?c?m-r xrmK A- 19579 -3-7, s, KvA T ppli ur="r2 Flp-1 —x -0- P0 L- 0 V H V MAKI�- A— 19580 -7 K VA 0 1 '!�' -r 5 - x MAKf::� 5C,H-EMATIC LE6EWP rc2m-r xr-m F?l PP-1 LJOWt2 CA P u "--2 E'r 0 v t VA U L—r!�� 4 1 a x 4 1 5 X3'6" VAULT WITH 41 0 X 4'6 X L- I P e, z UN I-rl-5 1510 A19579 Z UN u ki I T�' r—Fr 7 uNrrl�- F 41T77 4 HowF-L.L. WAY CAE�[,F, rozol or- 1/0 AL, cmc-rpc we�u-r L-25, JACKE�TF-P F21 MAKe FO 50' Or Z" P\,/C 0,Y PUP (OrF-W CUT 9[2) OF: Z" F7\/C E�,Y CUC2-r c )�N- 19 5 7 9 1, A Ar I C 15 C H E ivi N T 15, PUBLIC UTILITY DISTRICT NO. 1 OF SNOHOMISH COUNTY REV. 7187 N. 4510 5KI2 AV S 1-50UTH COUKI-ry AREA POLE NO. W151/4 S Z6 T VI R DATE Z W.O. NO, 16 8306 REASON FOR WORK fp- 9:0 v I P F, PIZ I I-IGN112 I !:k ENGINEER ?A'rC H E-rT OWG. NO, 06-7614 ro v, 1--ry- 2ARK, AFT-6 DRAFTER U.G. NO. (ZO) u w I SCALE APPROVED DATE WORK COMPLETED FOREMAN ENVIRONMENTAL ANALYSIS X EXEMPT 0 NOT EXEMPT SUBSTATION' W 615-66A-1715- FEES REO'D M YES 0 NO ITEM C PARA. 18 PRIMARY OVERHEAD CIRCUIT NO. I Z— 4057 PHASE 6 . KV 0 RESIDENTIAL U.G. COND. 0 COMMERCIAL ADD CKT.� FT. PH ROAD CROSSINGS ONLY DATE DWG. NO. LEO# REM CKT. FT. PH NET —4 9 7 CKT. FT. SECONDARY OVERHEAD O.H. U.G. COND. kv REVISIONS BASIC FEE $ ADD CKT. FT. PH REM CKT, FT. PH I APPR NO. DATE DESCRIPTION NET CKT. Ft METERICONV. POLE $ PERMITS (DATE GRANTED) PRIMARY UNDERGROUND 0 TREE TRIM 0 RESIDENTIAL 0 STATE 0 COMMERCIAL 09 COUNTY 512HOIQP'�' BASIC FEE $ LEU #' 0 CITY n SECONDARY UNDERGROUND EASEMENTS CR REQUIRED 0 NOT REQUIRED BASIC FEE $ UNDERGROUND PLAT BASIC FEE $ DATE RELEASED FOREIGN CONTRACT$ —1 FT.@$ 0 GTNW JPN # STREET LIGHTING 0 CATV JPN # t FT.@$ 09 JOINT TRENCH GTNW CATV.. WORK IN RIGHT OF WAY 0 JOINT BORE GTN & CATV 0 PRIMARY W AS -BUILT 0 SECONDARY POLE STENCILING t FT. @ $ $ FROM TO APPR NO. DATE DESCRIPTION MISCELLANEOUS FEES��,:;8 TAKE OFF POLE VAULT $ PRE-CONSTR. REQUIREMENTS PERMIT $ M TREE TRIM 0 PUD LOCATOR, .$ 54 BACKHOE 0 ONE CALL DATE TOTAL DUE $ INDEX POLES L09S U.MAP-1 DATE PAID RECEIPT # XFMR -MAP NEW SVCE APPILICATION # LOCATION MAP PAGE DATE PRINTED 7-7 DIOTHS 56 A B I", En ST7BL4KE 0, CHERRY ST sp A'� A VIE%aw --SUNSET UEAV 17 l?K rl �PAM z Ntll SA (A CARU 2 'jKlNGSl0- VNDERWA GLP % z ZA > P > mburs fUARY c "Nc :wv TI I .. $4 ON? ST NNE ST 3: Pr, I list"! > 4 VICINITY MAP 118442 1� :Z 001 1� t 7 I Set the stal�es. 2. Excavate a 4"x4" tren,-h Filter barvier: This sediment barrier may be constructed usiol, Maintenance upslope along the line of Strenj",th nyt,thetic filter fabric. It is denigned 1:(,r low stakes. op inoder�,I,L flows not Lxceeding, 1 cf.4. 1. Silt fencer and filter barriers sliall be inspected immediately after each rainfall and at least daily during prolonged rainfall. Any I T, 1. The freight of a filter barrier shall be a Minimwit Of 15 inches and required repairs shall be made irrimediaLely. shall not exceed 18 inches. Inould the fabric on a silt fence or filter barrier decompose or it become ineffective prior, to the end of the expect 14 2. standard strength synthetic filter fabric shall be purchased ed usable life and Lh,., barrier still be, necessary, the fabric .9hall. be replacLtl promptly. in a continuous roll and cut to the leng to avoid the use of joints (and thus improve the strength art(] efficiency of' ,th of the barrier 3. Sediment deposits should be removed after each storm event. They Flow must be rL-inovod wheii depostita reach approximately orie-l�alf Lhe heirlit 4" 3. The !;t,dws shall be spaced a inlaximum of' 3 fe-A apart at tho barrier (,f the barrier. 3. Staple filter material to 4. Backfill and compact the location and driven securely into tire- ground (mininjum of' 8 iiwhes). 4. Any --edirrient deposits remaining in place after the silt fence or, stakes and extend it into excavated soil. 4. A trench shall be excavated approximately 4 inches wide art(] I, inclies fil*Lr bilrrier Is 1`10 loiiEer required shall be dressed to custforin the trench. deep along tire line of' stakes and upslope from the barrier. witli ttw existing grade, prepared and seeded. .�ktqt:,, ih 5. The filter material shall be stapled to the wooden stakes, and 8 j; inches of the fabric shall be extended into the trench. Ifeavy duty not be qLapled to exi3tine troei. -ast 1/�'-inch lotij, shall be used. Vi I ter material r -44 Wirt. staples at lo shall 6. Thc trench shall be bac%filled and the soil compacted over- the filLor 11"Aurial. 7. If a filter barrier is to be constructed across a ditch line or swale, the barrier shall be of sufficient length to eliminate csid flow, awl the plan configuration shall rejemble air arc or horseshoe with CONSTRUCTION OF A FILTER aA,�MER the isids oriented Up3lope. 8. Filter barriers shall be removed when they have served their useful purpose, but not before the upslope area has been permaneiitly stabi- r_ I >A Tt _-E-1 11 F tF �7 lizLd. 1�7_111401 -7 1 I e7 NV -4,- -Tr� A_ A N --N it A-- 7`� - ......00000" T- I W r;: _,-A I r2 V vV -mAi L_ -rA i 'A LIN r2e42_4, # A W Ir 0, V, 41 "V, V, A e. 1< IF Y? 5 U k_1 PAC E /�A C� 8 7. _1[ I t a L4- T C.-L-i L-V e-p-_P5 ra-z-7.4 -r \r IF, X /r- r- Z r-r-on- 71 '0 G`)QA65-L1NGtD 15WALF= od F_ T. 15. "YP I r I J1 L Iiiiiii - I I 77' A PLANT LIST FOR DRAINAGE SWALES yt;o mr I BOTANT.CAL NAMF COMMON NAME ITT Alopecurus prttensis Meadow Foxtail K/ undinceus Poir. Creeping Foxtail a Alopecqrus ar RedLop Agrotis alba (VI Festuca rubra Creeping Red Fescue Annual ryegrass(es) Lolium ssp., L. meltiflorum /r-r -zA. & Phalaris arundinacea Reed Canarygrass Z K Phleuni pratense Timothy F r- i_� YE 'New Zealan Trifolium repens d' White Clover taken from: for Soil Conservation in the Pacific L all Grasses and Legumes 4- Agricultural Handbook No. 339, North U.S. Department of Agriculture, west and Great Basin States, L Soil Conservation Service, rel)rinL January 1979. J OY12 _4 1w- �,PL_L k LOW WALLS 3 3'.0' 11.1. 01-10, 11.1. 611 106 1.925 0,690 2.790 5.56 4 3'.5. 11.3. 01-10, V-4' M 82 3.036 1.20d 2.513 6.75 1.,. o'.10, V-1u, 8/U 134 5.080 I.M 2.643 6.13 6 o'.10, VUJ IOU ?.656 2.1160 2.06 V.61 I/B lo.!Idia 4.051 1.61 � 11.00 fill 21Y 14.4Y/ !,.52J, 2.624 12.42 9 6 -3 1:-o: 0:. 1, a: 2 .1 a. 0 :a 314 Jil 111111/0 �.300 1.!0112 13.7Ja to 6'-Y' 2'-4* 0'- 10* 3'-1' 1440 243 24.05V VAIU 2.4151 Moir HIGH WALLS 1 0 6:-9: 2-4: 1:-,1: 3"-1: 446 262 24.983, 10.017 2.494 14.81 11 1 -3 2 , -6 1 -a :606 161 31.364 11.720 2.466 16.d6 0.061 '1.443 IV.04 13 V-4- V-lul 1,.,. 4'-4- 1 YOU '1110 40.704 1 V.4/4 2.4/4a 21.44 14 ".9. J,-U. 11.3. V-4- 2uyi '156 !16.1116 21WI �AUII Y3.// Is 9'-4- 31.,. 1,.,. 4'- 10' Mu 1U6 68.OdJ 20.243 2.43V 26.42 16 "I.Y. Y-4- 11.4- 11.1. �420 2�1 7V.164 33.464 2.384 29.ou :7 lo:-4' 3'-6* 25�6 2ul 94.193 39.286 2.413 31.91 a 1 0-10, 271 U 2UI 109.851 4!a.741 2.AU2 34.84 19 1 3 , 1'. 'IY 0 24 24.!a6 52,86 2.356 37.78 20 1:1*9: I'll 60.6d 1 2.340 40.0 4 - .6 6'.2- 3U42 745 141.985 1 1 1 A 33*40' or "0. 0 0 P So 0 171.1 S IS? [C- L ALTEHNATE ONE LENGrH ?-OPTIONAL LUG AND 51101'IT "0 "0" HAUS UAHS - SVACING So SPACING So FIG. 14-1 BAR DETAILS AND NOTATION- LOW WALLS LOW WALLS -Dowels only -No Splices 3 #3 (,.1 18 11.5 - - - 13 a 2'.6 (-,- In 14 (,it 10 0.6 0.070 4 13 vo 18 11.7 - - - #J . I% I I I,,, 111 14 (.at 10 9.9 0.039 5 1301 18 11.9 (h. - - - 03 .:V-7 (". to 14 (-,- 10 11.1 0.067 6 13 (,,1 12 V-11 less - - - 13 . 4'-7 bl. In 14 (,It 10 14.2 0.106 7 13 fai 8 21.1 top 21.7 - - 13 . 4'-8 bn In 14 (,It 10 15.3 0.157 8 14 ('Ji 11 2'.4 cover) 2'.9 - - 13 at V-0 (,it 13 14 01 1 D 18.5 01223 9 14 (al 7 V1 2'.6 V-0 - - 14 x V.0 (-,1 10 14 (In 10 22.0 0.305 10 14 Na 6 21.8 3'-2 - - 14 A V-0 01 16 14 (,it 10 28.6 0.408 HIGH WALLS -Close 0 Tension Lop Splices 10 14 ot 0 2-41 V-10 V. 3 13 (,it 9 V-6 14 x V.0 Vv I 61/a 15 (,it 13 77.S 0.2113 11 14 (,at 6% V-7 ,,.I V-3 13 (m 7Y, 6'. 1 14 al $'-0 (,,- 13-/l 15 (w 13 32.3 0.349 12 #5 VA BY, 3'. 4 4'.8 I'-ft 14(,119 61.7 15 X V-7 (m 111/, 15 W, 13 40.3 0.473 13 05 (,a, 7 V-6 41-11 I'-B 146119 P-I #5 x V-6 Im 1411, 15 Vs- 13 45.0 0.504 14 060,9 V-9 S'.6 2'.0 14 (,at 0 71.7 16 x A'.0 0, 1711, 1.5 6.113 53.8 0,594 is 16 WA 7 Va 3'.11 V-9 2'.0 15 (,it 9 81.4 06.6'.5 W. 15 05 1, tI 13 65.4 0.03 16 41.7 61.1 2'.0 150119 8'. 10 16 . 6'.7 01 13 3 0- 13 73 2 0 * 800 11 17 (,at 7 Ili 4'.5 6'-9 2'.9 15 (", It 91.4 17 . I'll "', * 1:: IS ("t 17 011.2 0.916 Is '761.7 41.7 11.2 2'.9 16 (,it 9 101-o 1, 11 . 7: 111- 3 l/a af,5 1- 11 I o4,7 1.041 19 1861.8 4'-10 8'-0 V.8 16 (,,1 9 101-6 10 . 9 .0 1­16 15 f"I 17 20.11 1.175 20 18 (,it 7 51.1 81.4 V-9 170,9 111-6 #8 x 9*.2 be 14 '501 12 146.7 1.310 APPROVA APPROVED FOR CONSTRUCTION BY Ago;;�r1k QUARKY 6PALL eACKFILL rul Lear In I a (1) Size categories shall Include: Two -man rocks (300 to 600 pounds). 13" in least dimension; to 4t60 6 Three-man rocks (800 to 1200 pounds), 16" in leatit di- menallon; and Four -man rocks (1500 to 2200 pounds), 18" In leaUt di- Z4# mansion. Four -man rocks shall be used for bottom course rock In all 1, 1141 rock retaining walls over 6' in height. Die, 1? (2) The rock macerIal shall be as nearly rectangular as possible. NO stone hall be used which does not extend through the W.1 11 . Then rock material ahall. be hard. sound, durable still Z. free from weathered portions, acama, cracks. cither defects. W The rack density shall be a mininium of 160 pounds per cubic ,4 Cj avoos, foot. a b The retaining wall shall be started by excavating a trenelk, not leas than six (6) locheii or taloare thao oite (1) toot lit depth I)CIOW - FIL-17EK FA15RIC subgrsile fit exclavatioti �ectious or below Lite existing groutid MIKAFI 140 OR level Lot calbanionent sections. Rock selection and placement shall be UUCII that thel'tu Will be itilitlintsin voldn anti. Jai the exponed face of the wtill, tin upen voids over six (6) Incites across In any allarecticto. The flival course . 4V sli,ill I"we a cotitinuoun appearance still bit placed to minimize erosion of tire backfIll. material. Tire larger rocks shall be placed at cite 61 I-ERP. PVC base of tire rockery no that the wall wil I be stable said have a L 4qOO 0 X, NLhblo appearance. The rocks shall be placed In a matiner such that longitudinal axis of the rock shall be at right angles or perpen- dicular to the rockery face. The rocks shell have all Inclining faces slopling to the back of the rockery. Each course of rocks shall be seated an tightly and evenly as possible on the course beneath, Afteruetting eachcouraeof rock, all I vuldubetweei, the rocks &hall be chinked on the back with quarry rock to ell- tj minate any void sufficient to pass a.2-Inch square probe. The wall backfill shall consisi of quarry spalla with I a maximum RDCKF_KY DeTA I U size of four (4) Inchusand a minimum dize of two (2) inclieu. This material shall be placed to an eight (6) Inch minimum J-47. 5. thickness between the entire wall unit the cut or fill ittaterlul. Tire backfill material ahall be placed in lifts to art elevation approximately nix (6) inches below the top of each course of rocks as they are plecalid, until the upperuicaut contrite In placed. May backfill materlal on tire hearing surface of one rock course shall be removed before RULting the next course. Wheat a'sidewalk to to be built over a rock reLiAliting wall, the tell of the wall ithall be nettled atki leveled with u Call Constructed of cement concrete. Class "C" in accordance With the applitable provisions of Section 6-02 of the Standard Specifications. but with reduced witter content resulting in ulutup of riot over two (2) Inches. 1_4 .1-- G IT DATE 9 11-50 VICINITY MAP GRADING AND T.E.&S.C. PLAN �4NIP',,J 1. 11Q11 Ccl'."�, FOR ",Z V IA X ft 2TS �,N CITY PARK APARTMEi\j ITS 1014AL IN NE 1/4t SECT ION 267 T 27 N, Re 3 E.t We M. 9 AAA 9 09 'EDMONDS, WASHINGTON IR W V. 'MAIR -0 -1990 Lovell-salueriand & Associates, Inc. Engineers / Surveyors / Planners / Development Consultants 4-1. M 19400 33rd Avenue W., Suite 200 - Lynnwood, WA 98037 *(206) 775-1591 - (206) 340-0830 DRAWN CHECKED I DATE F.B. SCALE FUX NO. 1876 1GPr__1!Yr Z 11,11P .51 442 10 :z 0 t �A 0 � .'es-00 0001�_�_ //,/v zj\A \11\; , / I GENERAL NOTES 1. LOCATIONS OF EXISTING UTILITIES AND IMPROVEMENTS SHOWN ARE APPROXIMATE ONLY AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT LOCATION(S) OF ALL UTIL- ITIES AND IMPROVEMENTS TO AVOID DAMAGE OR DISTURBANCE. 2. ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICA" TIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIRE- MENTS ESTABLISHED AT CITY HEARINGS ON THIS PLAT. 3. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTION BY THE CITY OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF HIS SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 4. ALL WORK WITHIN THE PLAT AND CITY RIGHT OF WAY SHALL.BE SUBJECT TO THE INSPECTION OF THE ENGINEER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS FOR ROAD AND UTILITY CONSTRUCTION. 6. PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION COLLECTION FACILITIES TO INSURE SEDIMENT -LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND GRADING, AND SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND THE POTENTIAL OF ON -SITE EROSION HAS PASSED. 7. ALL STORM SEWER PIPE SHALL.BE CORRUGATED METAL 16 GA. .GALVANIZED AND ASPHALT COATED TREATMENT I OR BETTER, CORRUGATED ALUMINUM PIPE, 16 GA. OR PVC. 6. ROAD RESTORATION SHALL BE PER CITY OF EDMONDS STANDARDS. 1. ALL ROOF DRAINS SHALL BE CONNECTED TO STORM DRAINAGE SYSTEM. 10. AUL W-0017 011;ZAIN 'E��TUO:-:> 5HAL.L. t36 MAWKED WITH 0"x 4" PoeT �5HOWIW6 OEPTH 6�V-410 KAAI�ZKeO 11 4) _sse,� ------------ 77— - . .......... J t Inspection & Sampling Too (by others) Oil Retainer Baffle Vault No. 660-SB 5,750 lbs. I 012-P Diamond Plate Inspection Covers 222-P Diamond Plate Cover 23" 2 1 12" 6'0" 1 2.. 24" 24" --tl 2" 24" 4- 24" — NO. 222P B -*J 2 NO. 101 2P DIAMOND DIAMOND PLATE COVER PLATE INSPECTION COVERS A61 PLAN— BASE PLAN —COVER 7-4-V 2 No. 1012P DIAMOND PLATE IVI e�� NO. 222PDIAMOND INSPECTION COVERS (ki V. I & PLATE ACCESS DOOR OIL/WATER fl HOLE TYP SEPARATION CHAMBER N L INLET EA' END FOR INLET & OUTLET hole each and OIL RETAINER 0/,—BAFFLE for inlet & outlet L A FLOW DIFFUSER BAFFLE 0. 0 GnIT/SL UDGE a.. RETAINER WEIR 11 lo 'F 0.1 48-1/2" 0 0 INSPECTION & .0 0: 0 SAMPLING TEE (BY OTHERS) 1 1 12" 1 0, 1 0 1 7. 5-1/2 23" 21" 4'0" 116" GAI VANIZED STEEL PLATE BAFFLES &WEIR HOTF-: umuTy \/ALJL.—r e5.,';1MANY SECTION A -A SECTION B-B o&z,e,?-6A &-iopirs-t2 -ro r-l-r) INATER/01L SIF-PARATOR (M0D11=1r__tD rO 640 0 W.TG. �A I y-A;?_P 7M_z7 0 U) 0-11 > < CITY PARK APARTMENTS. I N NE 1/4, SECTION 26, T 27 N., R. 3 .1 W. M. EDMONDS, WASHINGTON MAR 3 0 1990 1 —.1 C�lr­