465 ADMIRAL WAY.PDF11111111111111
10011
465 ADMIRAL WAY
Guide -BKNV. August -7,: 1979 [S]
R8656A.
Batts and Blankets.
.
. - 'Inc.,.
Johnson C, J.`T., Seatt le, WA 90
Glass fiber blankets with facings on one surface.
Tbe following Products are eligible to bear the Laboratories' Classification Marking
incorporatingth6 designation 'THC 26/60" instead of the individual Fire
Hazard Classi.
fication valuej of'Flame4pread, Fuel contributed. and Smoke developed:
Aluminum Foil Faced Blankets
Foil -Kraft Faced Blankets
Foil-Scrim-Krafts Faced Blankets
Vinyl Faced Blankets
Vinyl-Scrim-FoU Faced Blankets
Fire Hazard Classification
Vinyl Film Vinyl Film Vinyl Film
Vinyl Film
Facing Facing Facing
Facing
Flame spread .25 so 20
0
20
0
Fuel contributed 50 0
Smoke developed lW160 45 55-66
66-90
(Continued on B card.)
This card is issued by Underwriters Laboratories Inc. 0
61-0
... . ........ ....
City of. Edmonds --- Water Depariment
TAP CARD
Date ........ . ............ .... 1.122
.. ......... ..
.....................
Meter Tap
........... size ......... ?& . ... .........
,q U-)6_Lj__
Mfgrs. .4�. ��z ..... Style ... . .. . ....
For............... I ............ ......................
LotNo ................................
STMET ..... FIL .. E-;-
Add. .................................................. ................ . ....... . ....... .
.................................
Service Location .......................... w .............................................. .................. .
.................................................. . ........................... ....... . ...................... . ................
Meter Location ....... X),
MakeTap ........................ ................................................................................ ..
...................................................................................... . ......................... . . ...... ..........
Pressure .............................. lbs. Test ....................... ......... %
SendBills to .......................... . ....................................... . ............. ................ . .....
Date of Work
........... ........................... . ........... . ......... ...................... . ZAJ�L ... Vo!reman
Guar. Voucher No ........................... . ............. ................... : ........... . ... .
Remarks: ..... . K. J..s ........ ......
............................................................................................. ............... .... . . .........
OUTGOING Index ......... Reg.... --Route Bk ..... —.StenciL ..... Card._
INCOMING Index....-L.-Reg ....... Route Bk .... . .. Stencl..._Card.
rial Cha r*geable to Installat lon rs
A* NW
NO.
SIZE
DESCRIPTION
RATE
AMOUNT
.........
..........
Meter ......................................
.......
..............
..........
Meter Box ................. . ............
..............
.. . .........
.
...............
..........
Meter Plate ............................
..............
. . .........
. . .......
.............
..........
Check Valve ..........................
..............
. .... . ...
..........
..............
* ........
Pipe, Galv. Screw . ..................
..............
. . .........
..........
..............
..........
Nipples ....................................
..............
. !-10 .... . ...
..........
..............
..........
Bushings ..................................
.............
.. . ... ......
..........
...............
..........
Plain Ells .................... a ............
..............
.. . ........
I ..........
.......... . ..
... I ......
St. Ells .....................................
..............
............
..........
.......... . ...
..............
..............
...............
...............
-----------
...............
....
....
..........
..........
..........
..........
..........
.....
..........
[ ....
..........
Tees .........................................
........................ ............................ .
.....................................................
......................................................
.................... .................................
................... : ..................................
......................................................
................ .....................................
--------
..............
.............
............ 7 -
...............
..............
..............
..............
............
------------
------------
......... ..
... . .......
1.� ......... ..
------
.........
..........
-- -------
-- .......
..........
...........
...........
Material Chargeable to Taps Connected
NO. SIZE
DESCRIPTION
RATE
AMO
NT
...............
----------
Pipe, Black Screw . ..................
.......... ...
....... T..— . .
---- - ---
..............
..........
Pipe, Galv. Screw ..................
................
..............
.........
..............
..........
Lead Connections ...................
..............
........... .
.........
..............
...........
Curb Cocks ............................
..............
.......... .
.........
..............
............
Corp. Cocks ...........................
.............
d
.... .........
.........
..............
..........
Unions ....................................
............. I
............
........
..............
..........
Saddles ................................. ...
..............
..... . .. .
. ........
..............
..........
Nipples ....................................
...............
.......... .
.........
...............
..........
Bushings ....................... * ----------
-- * ...........
'* ... **"'-
* ---------
- ............
..........
Plain Ells ................................
. ............
.............
..........
.71 ---------
..........
Street Ells .......................... . .
.............
.......... . .
..........
.............
......
Tees ..........................................
.................
...... . .
..........
--------------
----------
Curb Boxes ............................
..............
---------- ..
........
..............
..........
S. 0. Extensions ....................
....... ......
............
..........
...............
..........
Gates ........................................
...............
............
...........
..............
..........
Plugs ........................................
..............
...........
..........
..............
..........
Couplings ...............................
..............
* .... . ......
..............
..............
..............
...............
--------------
..............
...........
..........
..........
..........
----------
. ........
Gate Boxes ............................
.....................................................
...................................................
...........................................................
- .........................................................
................................................. ........
..............
.............
..............
.......... ..
......... . ..
..............
.............
............
............
! . .........
. . . .......
.............
.... . ....
...........
..........
..........
. .......
. .......
..............
........... : ...
..............
..............
...............
...............
..............
. ........
..........
..........
..........
..........
. ........
. ........
........................... ............................ ..
...........................................................
...........................................................
...........................................................
..........................................................
..........................................................
Hours Time —Day Men --------
..............
..............
..............
..............
..............
..............
-- ...........
-------------
............
.............
............
....... . ...
............
............
- -------
. ........
..........
. ........
. ........
..........
; .........
.......... .
. ........
Hours Time —Monthly Men ..
...............
....... . ...
.... "
::::
.......... .
..........
Hours Time —Auto ............ ...
..............
— -- — ---
----------
..............
..........
Superintendence ......................
. -----------
-----------
---------
...............
..........
Total ..................
I ........... ...
CITY OF ED'MONDS
PUBLIC WCPM — ENGINEERIM
STREET FILE
ACTION REPORT
N? 1023 -
SUSPENSE DATE:
Da te: 8/19/82 Time: 8: 00 am File #
Attachments: Yes
SUBJECT: Water main leak in front of address END
below.
REQUESTOR: NAME: Boat Loft
0-
ADDRESS: /,�5fAd.mi-r-aj1*-.Wa-yy J
PHONE: n/a
REQUEST RECEIVED BY:
TELEPHCNE r--1
CONTACT IN OFFICE =
OTHER:_ CygX called on recorder.
RECEIVED BY: M. LeVan
Dr)IITP Tr)-
1��M=
M-M
ACTION: 0(44,Nc,-azD 61--P tl R-77Z4Z
bF- P M640S &R)A,-L=Aj RaQ-27- PZA Tr --
All Concerned Notified ci2�
Action Completed/File MET
TO .11arry 1411itcutt
P,uilding n-Ifficial
'00-OFFICE COMMUNI(ftN sSTREET FILE
DATE 19 75
FROM "illiam 0. Ni,,,is
Assistant Engineer of
Field and Office
SUBJECT: Permit Application 465 Admiral !'a,,r - P,,pat Storaqn Pack. Addition
A review of "he permit application and related sketches indicate
the following:
1. An invasion of riqht-of-way permit is re.quired for the
proposed curb cut for ingress and egress to the proposed
v-ehicle parHnq area.
2. The Pew curb cut will be for vehicles only. Access for
hoat transportation crossing to boat launch will not be
permitted.
VX-1:jnjr
Attachments
Harry Whitcutt. Buildinp-Qfficial
TO
C
,gVPF DMONDS
0 5!
' H NORTH
EDVOFNDS. WASHINGTON 98020
----- - - � -- - ----- — - ------- - - --- ----- - ---- - -- � ----- --- - ] 'F1 POLICE DEPT. 10 FIRE DEPT.
SUBJECT REPLY REQ I DATE
Boat Loft, Inc. YES NO 2-6-74
I F-1 F-1
The proposed additiow-,to theboat-Istorage racks -appears to bear out,.your
requirements for a one -hour separation from the south property line.
Additionally, as the.occupancy is,being enlarged, andq as it is a unique
type of occupancy (in relation to normal building occupancies), the Fire
Department, under authority of Section 13.301.(a) and (b), will require
a system of wet:�standpipes and hose cabinets throughout. -the yard area -
for the protection of the property and stored items.
The standpipe systen,shall be installed per N.F.P.A. requirements and
spacing, including, but not limited to, structures for the storage and
protection of firefighting equipment, and to protect such systems from
freezing in cold,weather.,
PLEASE ISIGNED
REPLY TO R.H. Klein
Fire Marshal
T-7
I)i _
v'z
�OATE SIGNED
FORM NO. MEM. 88T
SEND PARTS 1 AND 3 WITH CARBON INTACT, PART I IS RETURNED WITH REPLY
TAX ACCOUNT/PARCEL NUMBER:
BUILDING PERMIT (NEW STRUCTURE): b 6Vj)emp it �g�
I I V
COVENANTS (RECORDED) FOR:
CRITICAL AREAS: DETERMINATION: E] Conditional Waiver Study Required E] Waiver
DISCRETIONARY PERMIT #'S:
DRAINAGE PLAN DATED:
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
PERMITS (OTHER):
PLANNING DATA CHECKLIST DATED: —
SCALED PLOT PLAN DATED:
SEWER LID FEE $:
SHORT PLAT FILE:
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S) #:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT
WATER METER TAP CARD DATED:
LID #:
LOT: BLOCK:
LATEMP\DST's\Fonns\Street File Checklist.doc
MEMORANDUM
lqclln 'r 4
Date: May 8,1996
To: Lyle Chrisman
Engineering Specialist
From: Ron Holland
Water/Sewer Supervisor
Subject: Port of Edmonds Boat Lofts
In my review of this project, the only thing that needs addressing that I can see for the
water utility is:
I The existing meter is 5/8" in size will need to be upsized. I cannot tell what
the uses will be. This might be addressed by the developer.
2. There needs to be a reduced pressure backflow preventer installed in the
heater space or in an insulated box located above ground (see attached).
Attachment
wordata\water\ptofedm
11 1
City of Edmonds c-Q Public Works
I
Of
tion
MEN
Mori
0
NEESE
FAN
MEMMENNE
EWA
No
PAI
MEM
F
MIPIA
M
MA
N
-
PON, ENEK
4" 170 GPM
1n1W
5" 350 GPM
ME
-papa
Em
'MEN
76"460GPM
FORM
H
ON EEME!8"760GPM
of
with all applicable safety standards and codes
in effect (See Section 5).
Figure 2-8: Relief Valve Discharge Rates For Reduced Pressure Backflow Assembl - ies.
RPBA Installation (Also refer to Section 7)
1. It is critical that all RPBAs be installed with
adequate space consideration for testing,
repair and maintenance (see Figure-2-9). All
assemblies require a minimum clearance for
removal of pins, check assemblies, and/or
relief valves. Again, consult the specific
manufacturer's installation instructions prior to
installation. In all cases, consult with the
responsible local water purveyor for
their specific space and installation
requirements. All RPBAs shall be tested
after installation and repairs to insure their
proper installation and satisfactory operation.
2. An RPBA installed more than five (5) feet
above floor or ground level must have a
platform under it for the tester or maintenance
person to stand on. The platform must comply
3. When installed in an enclosure, adequate
space consideration must be given for proper
testing and maintenance. An RPBA shall be
installed outside any enclosure or hooded
area containing fumes that are corrosive,
toxic, or poisonous. They shall not be installed
in a pit or trench belovV' ground level, or in
other areas where they may be flooded.
Flooding of the pit or area could result in a
direct cross connection through the relief
valve port. Semi -buried pits may be
acceptable (consult the responsible local
water purveyor) if the RPBA is installed above
the ground or maximum flood level with an
approved air gap between the relief valve and
(2-7)
Figure 2-8: Relief Valve Discharge Rates For Reduced Pressure Backflow Assembl - ies.
RPBA Installation (Also refer to Section 7)
1. It is critical that all RPBAs be installed with
adequate space consideration for testing,
repair and maintenance (see Figure-2-9). All
assemblies require a minimum clearance for
removal of pins, check assemblies, and/or
relief valves. Again, consult the specific
manufacturer's installation instructions prior to
installation. In all cases, consult with the
responsible local water purveyor for
their specific space and installation
requirements. All RPBAs shall be tested
after installation and repairs to insure their
proper installation and satisfactory operation.
2. An RPBA installed more than five (5) feet
above floor or ground level must have a
platform under it for the tester or maintenance
person to stand on. The platform must comply
3. When installed in an enclosure, adequate
space consideration must be given for proper
testing and maintenance. An RPBA shall be
installed outside any enclosure or hooded
area containing fumes that are corrosive,
toxic, or poisonous. They shall not be installed
in a pit or trench belovV' ground level, or in
other areas where they may be flooded.
Flooding of the pit or area could result in a
direct cross connection through the relief
valve port. Semi -buried pits may be
acceptable (consult the responsible local
water purveyor) if the RPBA is installed above
the ground or maximum flood level with an
approved air gap between the relief valve and
(2-7)
0
Types Of Back1low Prevention Assemblies
Test Cocks
.(4 req.) Ladde.r
�:,2411 min.
12"min. Relief
Valve Provide Heat
or Ins
OF �0-01 MA rZOMMM _zzzM led
TOP VIEW.
Access Door 311 min. when Valve
is fully open
.............
J/
Shutof f
Valves
(2 req.)
7-7
311 min.
1211min.
Drain ..................
Support
SIDE VIEW
Figure 2-9: Minimum Clearances For RPBA Installation.
(2-8)
vves Of Backflo reventi I on Assemi3lies
The daylight drain f rom 8.
Because of the inherent design of a reduced
a daylight drain.
pressure backflow assembly, fluctuating supply
above grade or semi-bu I ried vault must!
pressure on an extremely�low flow or static
* Be able to be bore sighted.
flow condition may cause nuisance dripping
Be installed above the ground or
and potential fouling . of the assembly. in a
*
maximum flood level, whichever is
static condition (i. e. an RPBA on the make-up
reduced
water line to a boiler), the zone of
higher.
pressure between the.check valves must be
Be able to reasonably handle the volume�
maintained at a 2.0 psi or greater differential
of water that potentially could be
below the incoming supply pressure.
discharged from the relief valve port
Depending on the degree of fluctuating Supply
(see chart in Figure 2-8). >
pressure, the assembly may discharge water
In all cases$ whenever access to a
from time to time. This nuisance discharge
valve.
vault is requiredo foil ow and comply
can potentially foul the first check
the installation
'state and local safety
While not effective in all cases,
with
requiremen ts regarding Confined
of a soft seated check valve immediately
space entry (see Section 5).
ahead of the RPBA will often hold the pressure
constant to the assembly in times of fluctuating
4. An RPBA shall only be installed in a horizontal
supply pressure.
configuration. Any other orientation may deter
hydraulically to avoid
the RPBA from preventing backflow. 9. Size the assembly
I excessive pressure loss. The head loss is not
5. Be careful to insure " that the assembly is not
necessarily, proportional to flow. Some
installed where the temperature and pressure
assemblies have a high head loss at low flows
is maintained above the a ssembly's rated and
and IoW head loss at high flows.
labeled capacities. .
10. In areas where debris content in the water.
6. Thermal water expansion and/or wat er
supply, is high, good plumbing practice
hammer downstream of the assembly can
recommends a strainer with blowout tapping
cause excessive pressure. To avoid possible
ahead of the assembly.
damage to the system and assembly from this
21/2: inches and larger shall have
situation, use water hammer arresters or,
11. Assemblies
blocks to prevent flange damage.
surge protectors.
support
Consult the specific manufacturer for the
7. When the RBPA is located inside a building, it
recommended location of Supports.
shall be installed in a location where both the
flush the lines before
occasional spitting from the relief valve port,
12. Thoroughly
the assembly. Years of
and the possible constant discharge during a
installing
"failure
fouled check situation, will not be
experience have shown that Most to
objectionable. it must be emphasized that a
test satisfactory" results in new installations
which will reasonably handle
are caused by debris fouling one of the check
drainage system
the volume of water that could potentially be
valves or the relief valve.
discharged from the relief valve must be
provided, in the installation. The chart in
Figure 2-8 shows estimated relief valve
discharge rates.
(2-9)
4�1 - 9,3
-Y t . 18
April 19, 1996
CITY OF EDMONDS
250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works * Planning * Parks and Recreation 9 Engineering
William Tosky
Port of Edmonds
336 Admiral Way
Edmonds, WA 98020
Mr. Tosky:
BARBARA FAHEY
MAYOR
71
L
1E T r
It has come to our attention that the Port has reduced the amount of.parking available for Anthony's
Restaurant by temporarily storing boats in a parkmig area designated for Anthony's use on the east side of
Admiral Way. Further review has revealed that some of the parking designated for Anthony's by permit in
1989 (ADB-126-89) to the north of the restaurant has been striped yellow for permit use, and day time
marina use. Additionally, parking area designated for Anthony's use by the same permit to the south of the
restaurant has been restriped for trailer use.
The Edmonds Community Development Code required Anthony's Restaurant, to provide 20 parking stalls
for the first 4000 square feet of gross " floor area plus I stall per 100 square feet of gross floor area greater
than 4000 square feet. This parking must be provided within 300 feet of the restaurant. In 1989 when
permits were processed for the expansion of Anthony's Restaurant the Port showed how the parking
requirement was met. With the temporary boat storage, yellow striping of Anthony's parking stalls,
installation of trailer parking, addition of new boat storage facilities, and new office buildings, the City has
no evidence that the existing or proposed uses will meet the minimum parking requirements'.
Therefore, the Port must provide the City with a Port wide parking plan, indicating how parking.
requirements are met for the existing uses and the proposed uses on Port property. Since the new office
buildings and the boat storage facilities affect parking, permits will not be issued for either of these
proposals until the parking issue is resolved.
Please submit the required parking information to both Sharon Nolan, Building Permit Coordinator, and
me, John Bissell, Associate Planner. It may be helpful for both you and the City Staff if we schedule a
meeting with you, your consultants and City Staff to discuss exactly what you need to do to comply with
City requirements. You 'may contact me at 771-0220.
Sincerely,
John Bissell, AICP
Associate Planner
C. Sharon Nolan, Permit Coordinator
Jeffrey S. Wilson, Planning,Supervisor
Robert Chave, Planning Manager
Paul Mar, Community Services Director
Tom Rosling, PND
0 Incorporated August 11, 1890 0
Sister Cities International — He�kinan, Japan
77�
N,.
16
M
V, 0"
It
V i
-5,
4
STFt ILE
EET F
ndii
I Ed=
city Q�
Comm
unity Services
Date:
Received of:
J
"j j(b -5 -------
$
Cash-'
Check -------
Water Meter
Water Connection
Sewer Perm e
Tn
ink Charge
Sewer Connection
wa e Dump Permit
FdW Invasion
(620 fund)
Depo�
reet Restoration
S )et Use Permit
tr(
uilding Permit
Ispection
Ian Check/Plat r
S s & Plans Deposit
7oning Applications
ihorellne Permits
S.E.P.A. Revibw
Recording Fee
Photostating
Sales Tax
Other
X.
"J
Time:
Hearing V
Date of H
4
By.
1. I.V
p�
J
.4, "V 1:`
V 'A 't. V.�
.,4
NJ�D 'i V
�39006,�..
ADB-15-79
FILE #
FOI;4%1 FOR DIMPUZATION OF [SIGX.Ifit*WNONSIGNIF.ICAI\ICE]
Description of proposal Addition of boat storage rack
-Proponent Boat. Loft, I nc.
465 Admiral Way
Location of Proposa
Lead Agency C i ty. of Edmonds
This pToposal has bccn dcte i ot have] a sianificant ad-
rin-ned to �Wzjz/n
ETS
verse inilwict upon -the envirormicnt. An. [�klis not] required under
10-143. 1 21C. 030'2) (6) . 1his decision was ruade af ter revieiq by f-he lead-
L
P
ac,0111-Y OA. a conq)-leted. eiwiromicn.tal checlaist and other information on
file with the lead agency.
Dan Smith
Responsible Official
Position/Title Planninq Division Technician
Date Tebruar' 1, 1979 Sig -nature
y
Y 0 F E D'll 0 N D
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PUBLIC WORKS ENVIRONMENTAL REVIEW
NAME: �i L-45-ff� �L-t- 4�C- . - FIL E # -/9uJ"6L')
LOCATION:
SUBDIVISION D PLAT E:l P..R.D. D MULTIPLE �9`t0llMERCIAL
AN ENVIRONMENTAL REVIEW OF THE PROPOSAL HAS BEEN COMPLETED
AND THE FOLLOWING DETERMINATIONS HAVE BEEN MADE:
mrL
ow.,:�MV41-Lm --- - 0
MUM -
DATE:
I
CITY OF &ONDS PROJE4 Larp�
A 79006..S '%AME��oAT C,
ENVIRONMENT4LWSESSMENT DATE ITTED
The information on this form will be used to determine the effect of your action upon the
environment of the City of Edmonds. Please answer each question as thoroughly as possible.
1. LAND
Area ��b 11� /0!9 So i 1 s Type SA,-wo�Z Limitations
Description of topography (% slope) Nr
NOTE: If grading or filling wil 1
Grading: Estimated cubic yards -Z-C.> >L&op S exceed 500 cubic yards a grading
and filling plan must be sub -
Filling: Estimated cubic yards mitted with the application.
Estimated area to be paved (including buildings) &�o X 14CD
Estimated area in open space (pervious surface) 4S' X 400'
2. WATER
Stream - Estimated flow (cubic feet per second)
Will stream be altered? If yes',.to what degree?
Other water bodies?
Impact on storm drainage Method of handling runoff
Adjacent to shorelines zone? Within 200 feet of MHHW? wo
3. VEGETATION
Type and approximate number of trees 9__
Minimum diameter of trees to remain % of trees to be removed
Ground cover % to be removed
Proposed landscaping, if any
4. EXISTING LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT:
Single Multi
Vacant Family Family Commercial Other
North
South X
East
West
5. CIRCULATION
Estimated -increase in auto trips daily
Availability of public transportation
6.. AREA OF IMPACT
Neighborhood City-wide Regional
7. EFFECT'ON AIR QUALITY
8. CHANGES IN NOISE GENERATION
(11/78)
ENVIR014MENTAL ASSESSMENT
DESCRIPTION OF PROPOS
FILE # W,013 -
A/I`
061�e. Q
PROPONENT: -5&a;jI
EXISTING USE:
ENVIRONIMENTAL IMPACTS FROM PROPOSAL:
790066
SOILS/TOPOGRAPHY 7-1
^.,eA, a-e-I 1 11 141 11 110
1 ffelf0a
WATER/DRAINAGE
AI.R QUALITY L 06�
4t,C -rL47n
00,
CIRCULATION
"'44 4AOO� A`7 5� lie, AA4-1r1eIIW
fp-- rz4-#r
Vfk
trI40.
GE TI �,
V,
ECONOMI C
CITY SERVICES
ENVIRONMENTAL FINDINGS:
There will be certain environmental impacts but they do not constit ute a signif-
fcant adverse impact on the environment and no environmental -impact statement
will be required.
There will be significant adverse -impacts on the environment and an environmental
impact statement will be required.
There will be certain impacts on the environment however it is necessary to obtain
more information before a declaration of significance or non -significance is made.
CITY PLANNER YATE
79006::)
ENVIRONMENTAL CHECKLIST
Introduction: The State Environmental Policy.Act.of
1971,.Ch�ipter 43.21C, RCW�,, requires'all state and local
governmental agencies to consider environmental,values
bath.fortheir own actions and when licensing private
proposals. The Act also requires that.an.Environmental
Impact Statement.(EIS) be prepared for all major actions.
significantly.affecting the -quality of the environment.
The purpose of this checklist is to help the agencies
involved determine whether or'not a proposal i's such'a
major action.
Pleasie answer the following questions as completely.as
you can with the information available.to you Where
explanations of your answers are required, or where you..
believe an exp.lanation.woul,d be helpful:to government
decision makers, include your explanation in the space
provided, or use additional pages. You should include
references to -.any reports or studies of which you are
aware,and which are relevant to the answers you.provide..
Complete answers, to thosequestions now will help all
agencies involved undertake the required.environmental
review without unnecessary -delay.
Thefollowing questions apply to your total proposal,
not just to the, permit for.which,you are currently
applying or the proposal for which a ught
pproval:is so
Your answers should include the impacts,that.will be,
caused by your proposal when,it is.completed, even:,
though completion maynot occur until sometime in the
future. This will.allow all agencies involved to complete
duplicating
their environmental review now, wi
paperwork in the future.
NOTE: This is a standard form being,used by�all state.,.
and local agencies,intheState of Washington for various
types of.proposals. Many of the questions may not apply
to your proposal. If a question does not apply, just
answer it "not applicable" (N/A) and continue on to the
next question.
1. Name of Proponent
.2. Address.and Phone�Number of Proponent 7_,LA4�,� L-JA
,3. Date Checklist Submitted--U
4. Agency Requiring Checklist
5.. Name of Proposal, if applicable.
6.., Nature and Brief Description of- P'rop.Qsal. (inclu.ding but not limited to
its size,,general design elements, a*n"d other factors that will give an
accurate understanding of its scope and nature:
7. Location of Proposal (describe the physical.setting of.the prop*osal,..as
well,as the extent of the land area affected by any environmental im-
pacts, including any other information needed to give an accurate -under-
standing of the environmental setting of -the proposal):
8. Estimated Date for Completion of the Proposal 'Y*1APc%..c_t4 1 1,1-717
9. List of all Permits, Licenses, or Government Approvals Required for all
Proposal (federal,.state, and local —.including rezones):
10. Do you have any plans for future additions, expansions, or further
activity. related to or connected with this proposal? If -yes, explain.
11. Do you know of any plans by others which may affect the property covered
by yourproposal? If yes, explain.
12. Attach any other application form that has been completed -regarding the
proposal; if none has been completed, but is expected -to be filed at
some future date, describe.the nature of such appli.cation..form:
-I-
ENVIRNMENTAL IMPACTS (Explanations of,all "yes"'and "maybe" answers,are required).
YES
MAYBE NO
1. Earth. Will the proposal result- in:
a Unstable earth condit : ions or in changes
in geologic substructures?
b. Disruptions,, displacements, compaction,
or overcover.ing of the.soil?
c.� Change in topography or ground surface
rel.ief features?
d . The destruction, covering or modifica-,
ti.on of any unique geologic or physical
features?
e. Any increase in wind or water erosion
of:soils, either on or off the site?
f. Changes indeposition or erosion of
beach sands, or changes in siltation,.
deposition or erosion which may modify
the channel, or a river or stream or the
bed of the ocean or any bay, inlet or
lake?
Explanation:
2. Air. Will the proposal.resul:t in:
a. Air�emissions or deterioration of
ambient ai.r.quality?
b. The creation of objectionable odors?
f, a*r movement, moisture
c. Alteration o 1
ortemperature, or any change in climate,
either'locally or regionally?
Explanation:
3. Water. Will.the,proposal result in:
a. Changes in currents, or the course
or direction of water movements, in either
marine or fresh waters?
b. Changes in absorption rates, drainage.
patterns, or therate and amount of sur-
face water runoff?
T t..� MTUt NU
c.. Alterations to the course or flow,
of flood waters?
d. Change in the amount of surface Water,
in any water body?
e. Discharge in.to.surface-waters, or�in
any -alteration of surface water quality,
including but not limited to temperature,
dissolved oxygen or.,turbi,dity?
f. Alteration of�the direction Or rate
..of- flow. of, ground waters?.
g�. - Change inthe quantity of ground
waters,...either through direct additions
or withdrawals, or through interception
of an aquifer by cuts or.excavations?
h. Deterioration in ground water quality,
either through'direct injection, or through
the seepage of leachate, phosphates, deter-.
gents, waterb ' orne virus or bacteria, or
other substances into the ground -waters?
i. Reduction in the amount of water
otherwise available for public water
supplies?
Explanation:
4. Flora. Will the proposal result in:
a. Change in the,diversity of species
or numbers of any species of flora (in-
cluding trees, shrubs, grass, crops,
aquatic,pl.ants)?
Reduction of the numbers of any
unique, -rare or endangered species
of flora?
c.. Introduction of new species of
flora into an area, or in a barrier
to.the normal replenishment of exist-
ing species?
d. Recut ion in acreage o,f any agri-
cultural crop?
Explanation:
-3-
YE& MAYBE NO,
5. Fauna.' WIll the proposal, result in:
a. Changes in the diversity. of species,
or numbers of any species of' fauna (birds,
land anima1s tncluding 're
-ptiles, fish..and
shellfish, benthic organisms', insects -or.,
micrdfauna)?
b. Reduction of the .numbers% of any
unique, rare or,endangered species
of fauna?
_Y7
c. Introduc.tion.of new species of
fauna into an area, or.result in a
barrier to..the migration or movement
of -fauna?
d. Deterioration to existing fish or
wildlife habitat?
Explanation:
6. Noise.� Will the proposal increase.
existing noise levels?
Explanation:
7. Light.and Glare. Will the proposal.
produce new li�ht or glare?
Explanation:
8. Land Use. Will the
propos*al result
in.the alteration of
planned land use of
the present Pr
an area?
Explanation:
9. Natural Resources..
Will'.the proposal
result in:
..a. Increase in the
rate of Use of any
natural, resource?
b. Depletion of any
nonrenewable
natural resource?
Explanation:
-4-
11. Population. Will the proposal alter the
-location, distribution, density, or growth
rate of -the --human ?
population of an area.
Explanation:
12.
Housing. Will the proposal affect existing
housing, or create a demand.for-additional
housing?
Explanation:
13. Transportation/Circulation. Will the pro-
posalresult in:
a.. Generation of additional vehi-cular
movement?.
b. Effects on existing.parking facili-
ties,.or demand for.new parking?
c. Impact upon. existing transportation
�systems?
,d. Alterati.ons to present patterns of
circulation or movement of people and/or
.goods?
e. Alterations to waterborne, rail or
air traffic?
f. Increase -in traffic hazards to motor
vehicles, bicyclists or pedestrians?
Expl anati on:— !�k Cy-
-50.
..an effect.upon,. or. resultAn a -need for
new or altered�governmental services in
any of the following areas:
..a. Fire protection?
b. Police protection'?
c Schools?
d. Parks or other recreational
facilities?
e Maintenance of public fa c i 1 it4e s
including roads?
f. Other governmental services?
_XI
Explanation:
15. Energy. Will.the proposal result in:
a. Use of substantial amounts of'fuel
or energy?
b. Demand upon existing sources of
energy, or require the development
of new sources of pnergy?
Explanation:
16. Utilities. Will the proposal result in
.a need for new systems or -alterations to
thejollowing utilities:
a. Poweror natural gas?
b. Communications systems?
c. Water?
d. Sewer or septic tanks?
e. Storm water drainage?
f. Solid waste and disposal?,
Explanation:
M-11
19.. Recreation. Will the proposal result
in an impact upon the.qUality or quan-
tity of existing recreational oppor-
tunities?
Explanation: Pit q V 0_e,!-� 004P to 1 0 W PrA.- Al�e_ T=iO(L—
a0A-T- t'S, vV KtAa-jZ_S
20. Archeological/Historical. Will the
proposal.result in an alteration of
a.significant archeological or his-
torical site, structure object.or
building?
Explanation:
C. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above information is
true and complete. It is understood.that the.lead agency.may withdraw any declaration
or non -significance that it might issue in reliance upon this checklist should there
be any willful, misrepresentation or willful lack of fu,11 qisclosure on my part'..
PROPONENT:
-7-
TO
Harry Whitcutt. BuildfAL\ Official
Cl-W OF EDMONDS
250 - 5th North
EDMONDS, WASHINGTON 98020
E] POLICE DEPT. FIRE DEPT.
SUBJECT REPLY REQ I DATE
. No
Boat Loft, Inc. YES' Oct.16,1974
P-1 ril I
Per -our conversation this date, this is to confirm that the Boat Loft was given
approval to delete the standpipe system previously required. Final fire protection
�to date for the structures existing on the premises consists of -ift two (2) dry
chemical extinguishers.
The extinguishers are 150 pound dry chemical, wheeled type, located as follows:
,.one unit at the -south end,, east side.
U) one unit located mid -point, east side.
-Additional structures will require re-assesment of the protection needs.
-4
PLEASE I SIGNED
REPLYTO-s. e Mar al
SIGNED
FORM NO. MEM. 88T
SEND PARTS 1 AND 3 WITH CARBON INTACT. PART 1 IS RETURNED WITH REPLY
:F �Ju File No. AM
Date
CITY OF EDMONDS
PLANNING DEPARTMIENT
CIVIC CENTER ANNEX, EDMONDS, WASHINGTON'- 98020
APPLICATION FOR APPROVAL BY AMENITTES DESIGN BOARD
I, (We) the undersigned,. hereby make ?pplication to the City of Edmonds
for Amenities Design Board approval (or modification of a previous
approval) of the accompanying plans for (nature of use):
which plans are attacheU
hereto and made a part hereof in accordance with the provisions of
Ordinance The. following. are pertinent facts vjith respect to the
proposed development:
1. Name and address of applicant(s):
2
E
c4and�s i 141A qggpghone: 77Y-,65'16'
2. Applicant's interest in property: owner agent.for owner(
architect ( ) optionor ( ) 'other (
3. Name and address of owner(s) P. - L Irk-
.C�ff died
Weld Phone:
4. Location of property: Street Nuribcr: 056- o4djwol Ali ---FcXw)x-,1s
%J
or Common Address:
5. This property is presently zoned:, 14
6. Use for which approval is requested is specifically described as
fol I ows:
7., Existing use of property: C-4 :5 h, e-r-
8. If approved, work on project will begin about: 7 //0 L-7,5-
9. Estimated tirne for completion of work;-,,2 I Ze e 1��
10. Date:
11. Attatcliments Number
I (We) hereby certify to the best of my' (our) kno'l'q edge, that the
sLaLements and information contained herein are all respects true
and correct.
Signature �f Applica�,T
71,11mv
41M
Sc>o,-T- C-1
Z u t-clol:
'o A-T-
rc) BE Loe-ATev
----------
91
r
A
'AousF-
A
Ct mmejL6kt.
A I _a I b%-OG, I
5101
740 j
310
FLOT FF'�- N
0
Wmi
am
Emma
E-E
Goa
00 —
CF)
2
0
z
z
0
LU
0
CC
,*6S
A
�s
CA
M (.-I -vo--6 % WQI,;zl
IISC7 1 --l- -
or
To"Cj,wc� -40 AM t
IN
ICAT LOFT INCIII
465 ADMIRAL WAY EDMONDS, WASHINGTON 98020 774 - 6515
(y)
OD
in
A
V
January 10, 1984
MEMO TO: Hal Reeves
Building Official
FROM: Gary L. McComas
Fire Marshal
1?w LO1-
SUBJECT: NEW OFFICE BUILDING AT 465 ADMIRAL WAY
After review by the fire department, the only requirement
is for one fire extinguisher as indicated - minmum size is
2,A-10,B:C dry chemical type.
GLM: be
OU I LD I NG ENVELOPE NE14T LOSS BUDGET
CALCULATIDN fOR"
JOB:
BUDGET (PER ENERGY CODE) BUILDING GROSS SQ. FT.
ASSEMBLY U VALUE AREA (SQ. FT.) U x A
WALL
CE I L I NG/ROOF
FLOOR
F VALUE
LENGTH IFT.)
F x L
ISLAB PERIMETER*
7,2-
BUDGET TOTAL
PROPOSED DESIGN
ASSEMBLY U VALUE AREA (SO. FT.) U x A
I
ILI
kVAu- XZ2A
F VALUE
LENGTH (FT.)
F x L
SLAB PERIMETER*
72--
3q
d
PROPOSED TOTAL
i 2-
To most the Code, the Proposed Total must be no greater than the Budget Total.
*Optional If permitted by Building Official
BW-3
ENVELOPE C014POKENT U VALUE
CALCULATION FORK
Sketch Building Section here:
V
Ai f#,
AT VAL-J,
BETWEEN FRAMING
AT FRAMING
Element R Value
E I ement R Value
inside Air Film
0 &b
inside Air Film
&P�
19:4 ]��
L1, 0.
-g- x
-
. Mw7sL—
Outside Air Film
Outside Air Film
17
O'S
2,71
Framing Percentage
Insulated fraction
Framed fraction
avg. Insulated R valu 0
Framed R value
271
uevg.
BW-2
ENVELOPE COMPONENT U VALUE
CALCULATION FORM
Sketch Building Section here:
CV
BETWEEN FRAMING
Element R Value
inside Air Film
Outside Air Film 1`7
10-135"
Framing Percentage .1-2,
U insulated traction Framed fraction
avg. Insulated R value Framed R value
Uavg. 0 4 0466
/kr
AT FRAMING
Element R Value
Inside Air Film
OVER FR�Iml,
29a
Outside Air Film 1*7
17. 4�2-
t
17-42-
i
BW-2
F ej3 14 �984
336 ADMIRAL WAY * P.O. BOX 398
EDMONDS, WASHINGTON 98020 e (206) 774-0549
February 10, 1984
Mr. Hal Reeves
Building Inspector
City of Edmonds
Building Department
Edmonds, WA 98020
Dear Mr. Reeves:
I am writing regarding the application for a building
permit by Boat Loft, Inc. The Port of Edmonds
operates several public rest rooms in our various
facilities.
We have no objection at this time to the Boat Loft
personnel or their customers using these restrooms as
they have done in the past.
Sincerely,
William E. Auerswald
PORT MANAGER
WEA/pt
Serving all of
Western Washington
0
TOWN & COUN Y
STEEL BUILDINGS
of Western Washington, Inc.
P. 0. Box 2040, Lynnwood, Washington 98036
Offices Located at 16521 Highway 99
Telephone (206) 743-1555
February 149 1984
Inspector Hal-�Reeves
City of Edmonds Building Dept*
Edmonds, Washington 98020
Mr, Reevesp
ADDENDA NO, 1
THE, BOAT LOFT PROJECT
Washington
General Contractors
License Number
233-01 TO-WN-CS-B261R3
Division 15 Add to specifications an electric forced air
wall mount hegter of capacity to heat building
to minimum 70 .
Division 7 Delete 11" vinyl face batt insulation, replace
2
with 311 thick R-10 same material.
Add R-11 fiberglass kraft or foil back 241'',-(
wide insulation to all walls.
Respectfully Submitted,
R ert A, �Shepp
cc Bill Karr Desi,-n-Manager.
STREET FILE
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS _4165- A�W49�01
LOCATION OF DEVICE zlCldnot,�_ ;o�e
DEVICE:
Manufacturer Model Size Serial,No.
LINE PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
11
1. LEAKED
El
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
2. CLOSED TIGHT
REDUCED PRESS URE
2. DID NOT OPEN
CLEANED
0
'CLEANED
0
CLEANED
'K
REPLACED:
�REPLACED:
REPLACED:
DISC -------------
0
DISC -------------
r_1
DISC.UPPER ----------------------
R
SPRING -----------
El
SPRING -----------
0
DISC.LOWER ----------------------
El
E
GUIDE ------------
El
GUIDE ------------
El
SPRING --------------------------
0
P
PIN RETAINER -----
El
PIN RETAINER -----
El
DIAPHRAGM, LARGE
A
HINGE PIN --------
11
HINGE PIN --------
0
UPPER -------------------------
El
I
SEAT --------------
El
SEAT -------------
El
LOWER -------------------------
El
R
DIAPHRAGM --------
El
DIAPHRAGM -------
El
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE.--
El
OTHER, DESCRIBE
UPPER -------------------------
E3
LOWER ---------------
SPACER, LOWER ,
OTHER, DESCRIBE
FTNAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
[I
CLOSED TIGHT -----
0
REDRED PRESSUFE
REMARKS: c2/,w_sZe./ 7-0AZZ
THE ABOVE REPORT IS CERTIFIED TO BE TRUE: DATE 6A_1�7.9
INITIAL TEST PERFORMED BY
OF
REPAIRED BY DATE
FINAL TEST PERFORMED BY OF DATE
STREET FILre
CITY OF EDMONDS PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS ew 5;
LOCATION OF DEVICE 1�1_dVoOPI
DEVICE:
0
Manufacturer Model Size Serial No.
LINE -PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
El
1. LEAKED
El
1. OPENED AT Z.2— _LBS.
TEST,
2. CLOSED TIGHT
)K
2. CLOSED TIGHT
X
REDUCED PRESSURE
2. DID NOT OPEN
E3
CLEANED
EJ
CLEANED
0
CLEANED
REPLACED:
REPLACED:
REPLACED:
DISC -------------
11
�DISC -------------
11
DISC.UPPER ----------------------
R
SPRING -----------
0
SPRING -----------
0
DISC.LOWER -----------------------
E
GUIDE ------------
0
GUIDE ------------
0
SPRING --------------------------
E-1
P
PIN RETAINER -----
0
PIN RETAINER -----
El
DIAPHRAGM, LARGE
A
HINGE PIN ---------
0
HINGE PIN --------
El
UPPER -------------------------
I
SEAT -------------
11
SEAT -------------
El
LOWER -------------------------
EJ
R
DIAPHRAGM --------
El
DIAPHRAGM— -------
El
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
0
OTHER, DESCRIBE --E]
UPPER -------------------------
0
-1 i
LOWER ---------------
E
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
0
CLOSED TIGHT -----
0
REDUCED PRESSU
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY ee-901 OF Ire DATE !�31179
47/
REPAIRED.BY DATE
FINAL TEST PERFORMED BY OF .—DATE
STREET FILE
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLIW DEVICE TEST REPIRT
NAME OF PREMISES
SERVICE ADDRESS
LOCATION OF DEVICE
DEVICE:
Manufacturer Model �ize Serial No.
LINE PRESSURE AT TIME OF TEST /3,57 LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE -LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF'VALVE
INITIAL
1. LEAKED
0
.1. LEAKED
0
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
E
2. CLOSED TIGHT
19
. . REDUCED PRESSUFE
2. DID NOT OPEN
CLEANED
EJ
CLEANED
0
CLEANED
REPLACED:
REPLACED:
.
REPLACED:
DISC -------------
El
DISC -------------
C3
DISC.UPPER ----------------------
0
R
SPRING -----------
0
SPRING -----------
0
DISC.LOWER ----------------------
1:1
E
GUIDE ------------
0
GUIDE ------------
0
SPRING ----------------------------
0
P
PIN RETAI-NER -----
0
PIN RETAINER -----
0,
DIAPHRAGM, LARGE
A
HINGE PIN --------
I]
HINGE PIN --------
El
UPPER -------------------------
.0
I
SEAT -------------
0
SEAT -------------
11
LOWER -------------------------
0
R
DIAPHRAGM --------
El
DIAPHRAGM— -------
El
DIAPHRAGM, SMALL
s
OTHER, DESCRIBE
0
OTHER, DESCRIBE
0
UPPER -------------------------
0
LOWER ---------------
11
SPACER, LOWER
OTHER, DESCRIBE
.FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT----7-
0-
CLOSED T-IGHT -----
0.
REDUCED PRESSURE
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY AOe,qwr.11 cc-qew OF c<, DATE 51-311;W
REPAIRED BY DATE
FINAL TEST PERFORMED BY OF DATE_
STREET FILE*
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS
7
-A
LOCATION OF DEVICE /-AZINLIP-4
0 . J_ 1
DEVICE: WAZiDP
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
E)
1. LEAKED
El
1. OPENED AT 2_,_3 LBS.
TEST
2. CLOSED TIGHT
L CLOSED TIGHT
I REDUCED PRESSURE
2. DID NOT OPEN
CLEANED
0
CLEANED
El
CLEANED
REPLACED:
REPLACED:
REPLACED:
DISC -------------
El
DISC -------------
11
DISC.UPPER -----------------------
El
R
SPRING -----------
El
SPRING -----------
El
DISC.LOWER ----------------------
El
E
GUIDE ------------
El
GUIDE ------------
El
SPRING ---------------------------
0
P
RETAINER -----
El
PIN RETAINER -----
El
DIAPHRAGM, LARGE
A
HINGE PIN ----- r--
El
HINGE PIN --------
1:1
UPPER -------------------------
13
I
SEAT -------------
El
SEAT -------------
0
LOWER ------------------------- -
El
R
DIAPHRAGM --------
D
DIAPHRAGM-;
El
DIAPHRAGM, SMALL
s
OTHER, DESCRIBE
El
OTHER, DESCRIBE
0
UPPER ------- ; --------------------
0
LOWER ---------------
0
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
11
CLOSED TIGHT -----
0
REDUCED PRESSU
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY CC 0)0/ 0 F -,,v -DATE S/3f/78
REPAIRED BY DATE
FINAL TEST PERFORMED -BY OF DATE
STREET FILE
CI*TY OF E.DMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLO W DEVICE TEST REPORT
NAME OF*PREMISES
SERVICE ADDRESS 414,57
LOCATION OF DEVICE 1251cW
DEVICE:. ktl)oc� '��o 0 /
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST G LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.
CHECK VALVE NO.
I
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
1--]
1 . LEAKED
El
1. OPENED AT Z,2 LBS.
TEST
2. CLOSED'TIGHT
E
2*. CLOSED TIGHT
0
REDUCED PRESSUFE
2. DID NOT OPEN
CLEANED
EJ
CLEANED
El
CLEANED
REPLACED:
REPLACED:,
REPLACED:
DISC -------------
El
DISC -------------
0
DISC.UPPER -----------------------
R
SPRING -----------
El
SPRING -----------
E)
DISC. LOWER ----------------------
El
E
GUIDE -------------
0
GUIDE ------------
0
SPRING --------------------------
0
P
PIN RETAINER -----
E3
PIN RETAINER
E3
DIAPHRAGM, LARGE
A
HINGE PIN --------
El
HINGE PIN --------
El
UPPER -------------------------
0
I
SEAT --------------
El
SEAT -------------
El
LOWER ------- ------------------
EJ
R
DIAPHRAGM --------
El
DIAPHRAGM
El
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
13
OTHER, DESCRIBE --E]
UPPER -------------------------
LOWER ---------------
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
El
CLOSED TIGHT -----
11
REDUCED PRESSURE
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY 40, 0 F D A T E
REPAIRED BY ty DATE
FINAL TEST PERFORMED BY OF DATE
STREET FILE
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
-NAME OF PREMISES
SERVICE ADDRESS
LOCATION OF DEVICE
DEVICE:- 9 C)00
Manufacturer Model Size. �erial No.
LINE PRESSURE AT TIME OF TEST
PRESSURE DROP ACROSS FIRST CHECK VALVE 6.3
"; I
LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
0
1. LEAKED
1:1
1. OPENED AT _L B S .
TEST
2. CLOSED TIGHT
2. CLOSED TIGHT
2r
REDUCED PRESSURE
2. DID NOT OPEN
CLEANED
0
CLEANED
El
CLEANED
REPLACED:
REPLACED:
REPLACED:
DISC -------------
11
DISC -------------
0
DISC.UPPER ----------------------
El
R
SPRING -----------
0
SPRING -----------
El
DISC.LOWER ----------------------
EJ
E
GUIDE ------------
I]
GUIDE ------------
El
SPRING --------------------------
El
p
PIN RETAINER -----
El
PIN RETAINER -----
0
DIAPHRAGM, LARGE
A
HINGE PIN --------
13
HINGE PIN --------
13
UPPER -------------------------
0
I
SEAT -------------
El
SEAT --------------
El
LOWER -------------------------
0
R
DIAPHRAGM --------
El
DIAPHRAGM— -------
11
DIAPHRAGM, SMALL
s
OTHER, DESCRIBE
0
OTHER, DESCRIBE
0
UPPER -------------------------
0
LOWER ----- ---------
0
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT, LBS.
TEST
CLOSED TIGHT* ----
13
CLOSED TIGHT -----
0
REDUCED PRESSURE
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
.I'NITIAL TEST PERFORMED BY, e-e-_111 OF EZ, DATE' 57-
REPA1RE D BY ---DATE
FINAL TEST'P'ERFORMED BY OF DATE
STREET FILE
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE,TEST REPO.RT
NAME OF PREMISES
SERVICE ADDRESS
LOCATION OF DEVICE 4 /-,,
0. le
DEVICE: -
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST 113s-
PRESSURE DROP ACROSS FIRST CHECK VALVE
N-m
LBS.
LBS.
CHECK VALVE NO.
I
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
0.
1. LEAKED
0
1. OPENED AT -3 7— LBS.
TEST
2. CLOSED TIGHT
19
2. CLOSED TIGHT
9
REDUCED PRESSURE
2. DID NOT OPEN
0
CLEANED
0
CLEANED
0
CLEANED
0
REPLACED:
REPLACED:
REPLACED:
DISC -------------
0
DISC -------------
0
DISC.UPPER ----------------------
0
R
SPRING -----------
0
SPRING -----------
EJ
D I SC. LOWER ----------------------
El
E
GUIDE ------------
El
rUIDE ------------
El
SPRING --------------------- 7 ----
Ej
P
PIN RETAINER -----
El
PIN RETAINER -----
El
DIAPHRAGM, LARGE
A
HINGE PIN --------
ED
HINGE PIN --------
0
UPPER -------------------------
LJ
I
SEAT -------------
El
SEAT -------------
El
LOWER -------------------------
El
R
DIAPHRAGM --------
El
DIAPHRAGM --------
El
DIAPHRAGM, SMALL
s
OTHER, DESCRIBE
0
OTHER, DESCRIBE --E:l
UPPER -------------------------
0
LOWER ---------------
13
SPACER, LOWER
OTHER,.DESCRIBE
FINAL*
OPENED AT LBS.'
TEST
CLOSED TIGHT -----
El
CLOSED TIGHT -----
11
REDUCED PRESSURE
REMARKS:
THE ABOVE REPORT IS CERTIFIED T 0 BE TRUE:
INITIAL TEST PERFORMED BY wis Cf- - �3 11 OF C _DATE. �5)31/79
REPAIRED BY ILK.K. DATE
FINAL TEST PERFORMED BY OF DATE
STREET FILE
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES )�� W
SERVICE ADDRESS
LOCATION OF DEVICE
DEVICE: vVz-70 97
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE 7Z LBS.
CHECK VALVE NO.
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
El
1 . LEAKED
0
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
2. CLOSED TIGHT
REDUCED PRESSURE
2. DID NOT OPEN
CLEANED
11
CLEANED
El
CLEANED
REPLACED:
REPLACED:
REPLACED:
DISC --------------
0
DISC -------------
I]
DISC.UPPER ----------------- 7
D
R
SPRING -----------
El
SPRING -----------
El
DISC.LOWER ----------------------
0
E
GUIDE -------- �-
El
GUIDE ------------ I
El
SPRI . NG ---------------- ----
C-3
p
PIN RETAINER -----
Ell
PIN RETAINER -----
0
DIAPHRAGM, LARGE
A
HINGE PIN ------
EJ
HINGE PIN ---------
El
UPPER ------------ 7 -------------
El
I
SEAT -------------
C1
SEAT -------------
El
LOWER -------------------------
El
R
DIAPHRAGM --------
El
DIAPHRAGM
El
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
C1
OTHER, DESCRIBE --E]
UPPER -------------------------
0
LOWER ---------------
El
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
[I
CLOSED TIGHT -----
0
REDUCED PRESSURE
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY _w/s IM17 0 F C� 74, el, DATE 5—/3P//-7
REPAIR ED BY -DATE
FINAL TEST PERFORMED BY OF DATE
E
0
STREET FILE
CITY IF EIMINIS -- PUBLIC WORKS -DEPARTMENT
ACKFLIW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS
LOCATION OF DEVICE
DEVICE:- 6)
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST LBS.
. PRESSURE DROP ACROSS FIRST CHECK VALVE 1b .7 LBS.
CHECK VALVE NO.
I
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
1. LEAKED
0
1 . OPENED AT _LBS.
TEST
2. CLOSED TIGHT
EJ
2. CLOSED TIGHT
REDUCED PRESSURE
2. DID NOT OPEN
CLEANED
0
CLEANED
CLEANED
El
REPLACED:
REPLACED:
REPLACED:
DISC -------------
El
DISC -------------
0
DISC.UPPER ----------------------
R
SPRING -----------
E]
SPRING -----------
0
DISC.LOWER ----------------------
EJ
E
GUIDE - ___1 ------
El
GUIDE ------------
11
SPRING --------------------------
P
PIN RETAINER -----
El
PIN RETAINER -----
11
DIAPHRAGM, LARGE
A
HINGE PIN --------
0
HINGE PIN --------
El
UPPER -------------------------
EJ
I.
SEAT -------------
El
SEAT -------------
El
LOWER -------------------------
R
DIAPHRAGM --------
El
DIAPHRAGM-;
0
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
El
OTHER, DESCRIBE
El
UPPER -------------------------
0
LOWER ---------------
E]
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
C3
CLOSED TIGHT -----
REDUCED PRESSU
REMARKS: ":�fxe�.C":ao w-'.1 C'/CZCj'-
THE ABOVE REPORT IS CERTIFIED TO BE -TRUE:
INITIAL TEST PERFORMED BY e-e-901 OF W'a� --DATE 6--SI-9A
REPAIRED BY .&>,e_ g5gKt, e'%' L, A- 9/ j e ge � � � . v DATE
FINAL TEST PERFORMED Bi AF 0 F L---,/
jv d DATE
e � . STREET FILE*
CITY OF EDMONDS —PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS ��W/ iwl 461A
LOCATION OF DEVICE
DEVICE:� zt;4&
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST
PRESSURE DROP ACROSS FIRST CHECK VALVE
LBS.-
4�� , !�;—
LBS.
CHECK VALVE NO.
I
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
El
1 . LEAKED
0
1 - OPENED AT 9 LBS.
TEST
2. CLOSED TIGHT
-14
2. CLOSED.TIGHT
- REDUCED PRESSURE
2. DID NOT OPEN
CLEANED
0
CLEANED
El
CLEANED
REPLACED:
REPLACED:
REPLACED:
.DISC -------------
El
DISC -------------
11
DISC.UPPER ----------------------
El
R
SPRING -----------
El
SPRING ------------
0
DISC.LOWER ----------------------
El
E
GUIDE ------------
0
GUIDE ------------
(__1
SPRING ---------------------------
P
PIN RETAINER -----
El
PIN RETAINER -----
El
DIAPHRAGM, LARGE
A
HINGE PIN --------
El
HINGE PIN --------
0
UPPER --------------------------
I
SEAT --------------
El
SEAT -------------
11
LOWER -------------------------
R
DIAPHRAGM --------
El
DIAPHRAGM — -------
0
DIAPHRAGM, SMALL
S
OTHER,. DESCRIBE
El
OTHER, DESCRIBE --E]
UPPER --------------------------
El
LOWER ---------------
F-1
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
El
CLOSED TIGHT ------
0
REDUCED PRESSURE
R E M A R K S
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY 0 F DATE
—!is
REPAIRED BY XKX DATE
FINAL TEST PERFORMED BY OF DATE
STREETFILE
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS
LOCATION OF DEVICE
DEVICE: 60a,&O,
Manufacturer Model Tize Serial No.
LINE PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE A2 LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
0
1. LEAKED
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
2. CLOSED TIGHT
0
REDUCED PRESSURE
2. DID NOT OPEN
0
CLEANED
C3
CLEANED
CLEANED
E3
REPLACED:
REPLACED:
REPLACED:
DISC --------------
El
DISC — -----------
0
DISC.UPPER. ----------------------
El
R
SPRING -----------
El
SPRING -----------
0
DISC.LOWER ---- -----------------
E3
E
GUIDE ------------
F-1
GUIDE ------------
11
SPRING --------------------------
0
p
PIN RETAINER -----
0
PIN RETAINER -----
C1
DIAPHRAGM, LARGE
A
HINGE PIN --------
El
HINGE PIN --------
El
UPPER -------------------------
0
I
SEAT -------------
El
SEAT -------------
El
LOWER -------------------------
0
R
DIAPHRAGM --------
0
DIAPHRAGM-
El
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
El
OTHER, DESCRIBE --E]
UPPER -------------------------
0
LOWER ---------------
.0
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
C1
CLOSED TIGHT -----
REDUCED PRESSU
REMARKS:
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY w/s ec-11? OF DATE
REPAIRED BY JLK.K. A&Opw& DATE 4,./-79
FINAL TEST PERFORMED BY _DATE (. -2-76
r,t e- c- OF-
STREET FILE 0
CITY OF EDMONDS —PUBLIC WORKS DEPARTMENT I
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES
SERVICE ADDRESS "/(o s- wA01"401
LOCATI ON OF DEVICE C
DEVICE:,' -el
Manufacturer Model Size Serial No.
LINE PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.
CHECK VALVE NO.
I
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
El
1 . LEAKED
El
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
)EL
2. CLOSED TIGHT
REDUCED PRESSURE
2. DID NOT OPEN
CLEANED
El
CLEANED
El
CLEANED
REPLACED:
REPLACED:
REPLACED:
DISC -------------
0
DISC -------------
El
DISC..UPPER ----------------------
11
R
SPRING -----------
El
SPRING -----------
11
DISC.LOWER ----------------------
0
E
GUIDE ---------- 7-
E]
GUIDE ------------
El
SPRING ---------------------------
0
p
PIN RETAINER -----
13
PIN RETAINER -----
11
DIAPHRAGM, LARGE
A
HINGE PIN --------
El
HINGE PIN* --------
11
UPPER -------------------------
0
I
SEAT -------------
El
SEAT -------------
El
LOWER -------------------------
El
R
DIAPHRAGM --------
El
DIAPHRAGM — -------
11
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
0
OTHER, DESCRIBE
0
UPPER --------------------------
C3
LOWER ---------------
0
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHTL.----
El
-CLOSED TIGHT -----
0
REDUCED PRESSU
REMARKS:- ZPA16—
THE ABOVE REPORT IS.CERTIFIED TO BE TRUE:
Vs CC -N 7
INITIAL TEST PERFORMED BY OF
REPAIRED BY
FINAL TEST PERFORMED BY OF.
DATE !-e_13
DATE
DATE
0 STREET FILE 0
CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES Atl�- 10) 40-4ev's-Z
SERVICE ADDRESS 1416E—
LOCATION OF DEVICE
DEVICE:.
Manufacturer Model Size Serial No.,
LINE.PRESSURE AT TIME OF TEST LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.
CHECK VALVE NO.
1
CHECX VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
El
I . LEAKED
11
1. OPENED AT 29- LBS.
TEST
2. CLOSED TIGHT
E4
2. CLOSED TI . GHT
REDUCED PRESSURE
2. DID NOT OPEN
El
CLEANED
F-1
CLEANED
0
CL:EANED
REPLACED:
REPLACED:
REPLACED:
DISC -------------
0
DISC -------------
0
DISC.UPPER ----------------------
El
R
SPRING ----- I ------
0
SPRING -----------
E3
DISC.LOWER ----------------------
El
E
GUIDE ------------
0
GUIDE ------------
0
SPRING ---------------------------
I]
p
PIN RETAINER -----
El
PIN RETAINER -----
11
DIAPHRAGM, LARGE
A.
HINGE PIN --------
1:1
HINGE PIN --7 - - - - -
El
UPPER ------------- 7 ----- -----
LJ
SEAT -------------
0
----------
SEAT ---
El
LOWER --------------------------
0
R
DIAPHRAGM --------
El
DIAPHRAGM
0
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
C1
OTHER, DESCRIBE --13
UPPER -------------------------
.0
LOWER ----- 7 ---------
ED
SPACER, LOWER
..OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
C1
CLOSED TIGHT -----
0
REDUCED PRESSURE
REMARKS:
TH E ABOVE REPORT.IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY wis
REPAIRED BY -K.K.K.
FINAL TEST PERFORMED BY
OF DATE
DATE
OF DATE
STREET FJLE 40
CITY OF EDMONDS —PUBLIC WORKS DEPARTMENT
BACKFLOW DEVICE TEST REPORT
NAME OF PREMISES �/ ZS47OM404
SERVICE ADDRESS
LOCATION OF DEVICE
DEVICE:
Manufacturer Model -§ize Serial No.
LINE PRESSURE
AT TIME
OF TEST
LBS.
PRESSURE DROP
ACROSS
FIRST CHECK
VALVE
2 -LBS.
CHECK VALVE NO.
I
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
0
1 . LEAKED
9
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
91
2. CLOSED TIGHT
El
REDUCED PRESSUVE
2. DID NOT OPEN
CLEANED
0.
CLEANED
El
CLEANED
REPLACED:
REPLACED:
REPLACED:
DISC -------------
11
DISC ----- --------
El
DISC.UPPER ----------------------
El
R
SPRING -----------
0
SPRING ------------
E)
DISC.LOWER -------------- 7 -------
0
E
GUIDE ------------
0
GUIDE ------------
El
SPRING --------------------------
EJ
P
PIN RETAINER -----
El
PIN RETAINER -----
11
DIAPHRAGM, LARGE
A
HINGE pitj --------
El
HINGE PIN --------
13
UPPER -------------------------
C3
I
SEAT -------------
11
SEAT -------------
El
LOWER ----------- ; ---------------
El
R
DIAPHRAGM --------
El
DIAPHRAGM -;
El
DIAPHRAGM, SMALL
s
OTHER, DESCRIBE
C3
OTHER, DESCRIBE --.0
UPPER --------------------------
0
LOWER ---------------
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT
TEST
CLOSED TIGHT -----
X
CLOSED TIGHT-----)�
_LBS.
REDUCED PRESSURE
REMARKS: _/� 00. 'e-'
THE ABOVE -REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY 'w/s 3 /7 OF C,&- DATE
REPAIRED BY Lo' —,i1V,0A97- 04' DATE06 -/-78
FINAL TEST PERFORMED BY OF 077-
DATE
6 STREET - FILE
CITY OF EDMONDS -'-.PUBLIC WORKS DEPA RTMENT
B A�C K - FLOW - - DEVICE TEST REPORT --
NAME OF PREMISES
SERVICE ADDRESS
LOCATION OF DEVICE
D E V I C E: 900 -
Manufacturer Model
LINE PRESSURE AT TIME OF TEST As LBS.
PRESSURE DROP ACROSS FIRST CHECK VALVE
Size Serial No.
LBS.
CHECK VALVE NO.
1
CHECK VALVE NO.
2
DIFFERENTIAL PRESSURE RELIEF VALVE
INITIAL
1. LEAKED
0
1. LEAKED
El
1. OPENED AT LBS.
TEST
2. CLOSED TIGHT
2. CLOSED TIGHT
REDUCED PRESSPTE
2. DID NOT OPEN
Lj
CLEANED
E]
CLEANED
0
CLEANED
1:1
REPLACED:
REPLACED:
REPLACED:
DISC -------------
DISC -------------
El
DISC.UPPER ----------------------
11
R
SPRING -----------
I]
SPRING -----------
0
DISCAOWER ----------------------
13
E
GUIDE ------------
11
GUIDE ------------
El
SPRING --------------------------
E-1
P
PIN RETAINER -----
El
PIN RETAINER -----
0
DIAPHRAGM, LARGE
A
HINGE PIN --------
El
HINGE PIN ----- ---
0
----------------------
UPPER --- *
0
I
SEAT -------------
11
SEAT -------------
E3
LOWER -------------------------
11
R
DIAPHRAGM --------
El
DIAPHRAGM-;
0
DIAPHRAGM, SMALL
S
OTHER, DESCRIBE
El
OTHER, DESCRIBE
0
UPPER ----------- m --------------
0
LOWER ---------------
0
SPACER, LOWER
OTHER, DESCRIBE
FINAL
OPENED AT LBS.
TEST
CLOSED TIGHT -----
C1
CLOSED TIGHT ------
11
REDUCED PRESSURE
REMARKS: WoP .51"946' 40PC4-)'t_'
THE ABOVE REPORT IS CERTIFIED TO BE TRUE:
INITIAL TEST PERFORMED BY o4e4n,�eC-Vl OF DATE s,-19117,9
REPAIRED BY DATE
FINAL TEST PERFORMED BY OF DATE
�STREET FILE
1478
PUBUC UTILITY DISTRICT No. I of Snohomish County So kxTR (SuWry Atsa
LlCAlll a 4-7 % &,DfA%V-AL W^V DATE 2A 0. S 4 -4 S I
POLL NO.
SWV4 S 21 T 27 R REVISION Owala S416�s
:.FCASDNFCAWORK SET PO L-F- S -rn RAI--%F- EwahlER Ma.1061A FILE
-G . DR024, :QK Eb,&T LAUr4r"Pe C. —ar
OA07M t�
APPROVAL
DATE W ORK COMPLETED
SU83TATWH F-DtAoWDS
E"ROMMINTAL ANALY"
FEES RE QUIREO YES No 0 X Ln�" 0 NOT wurr
PRIMARY OVIRHEA&. PAPA ITE. CIRCUIT NO.
LED$— O.H. LIZ, CONO.'— KV Or
ADD —7— CKT. Fr. _ PH,
'0- IFT. L-- REMY. — CKT. Fr. — PH,
NET — CKT. FF.
XXO III ON U-0 COND — Kv
Aoo Fr: — PH.
REMY. — CXT. FT. PH.
JWRY OVERNEAlk. NET — CKT. FT.
&—I FT. $—
METER POLE 6 ... MIT& WE
rvpg GP—TED
PRIMARY UNDEFUIROUND. (AESIDENUALI Z:) TREE rRIUMING
BASIC FEE 5
0 STATE
W lqi4e
I 1. 5-0 FT. 0 COUNTY
'X,OTV
LEU 0 0—
'0 11-1 FT 3—
SECONDARY IJNCZRGAOUM&.
BASIC FEE 5 "39MCKT3
.--20 6-1 FT.
BASIC FEE S I c-
tFT.0 S—AFT..S—
STREET LIGHTING: DATE RELEAHO
UNDERGROUND FLAT. 0 RlOu:RcO (3 NOT REOUIRED
—tpT.0 S—AFT—S FOREIGN CONTACTS
PRIMARY UNDERGROUND. (COUMEFOAU 0 GTNw JPN NO.
BASIC FEE S — C CA T V JPN NO..
to S_fFT. 0 JOINT TRENCH GTE A CArV Fu PL
ONIUQ SU50rVWON3 IS YR. REFUNDING)
POLE STENCILING
2KMT FROM _.TO leg 'i
TAKE OFF POLE
01111MANZOU3 FEM 5ET '55 POLF- I W LF-AQ OF
toENnry VIR"EXTS Se p-v ICE ce-OPS AF ?A%--F- FM%S-T-
SERv%CE%,- So Mila. ISN6. ACZ*S&
13 TREE TRIMMING 0 PLO LOCATOR Is — ---
cl ONE CALL a BACKHOE 0 'v.AL. Z5'. SP"Ce AS WrEC.EZZAr-Y.
0 OTHER
--71.= POSTED l(LEIC.L I KNU NE ISA p P Ly
TR ANSF
TWALCUM S CARDS I u-MAPs 4-71 AlI=lAor- SCAM
POLE OEPT.
DATE PAII�l. - I CIFOJITS.
LOCATION
NEW 3VC. APPLICATION P UAP PAGE
03 bw 23 -a
DATE PRINTED
DISPATCHER POSTED
Ovick NO.
STREET' FILE
ADDITION TO ANCHOR BOATS -
It is the determination of the Planning Staff that no substantial
development is proposed within the established shoreline zone.
DATED: January 20, 1978
L'afouir—elle, Director
i,ty Development Department
�ft� L4J F,"-,
Mary LoflBlock
AssociaN Planner
78 0 033 3
PR0JEC*A* iLkW C-a OZ
nATE SUBMITTED
ENVI RONMENTAL ASSESSMENT
In order to meet the requirements of the State'Environmental Policy Act of 1971,
the responsible official must make a declaration of environmental impact as early
as possible in the process of evaluating a project.
The infor;,,iation in this form will be used to determine whether it will be neces-
sary to require an environmental impact statement. If an impact statement is
not required, a Statement of Negative Declaration will be placed in the file.
If an impact statement is required, a draft statement must be filed with this
office, public notice given . and a review period of 30 days allowed. The final
statement and comments must be filed with the.Department of Ecologyj Office of
the Governor and the Ecological Commission.
The Edmonds Planning Staff will assist you in any way we can in accumulating
this information.and we would appreciate your cooperation.
1. Land:
Area i n arafts C-4
Soils type _��kAlp Limitations.
Description of topography (slope)
Grading: estimated cubic yds.
Filling: estimated cubic yds.
2. Water;
Stream - estimated flow (gallons) per minute 0 /V
Will stream be altered?
To.what degree?
Impact on storm drainage (increase in run-off)
Estimated area to be paved
Shorelines: within 20.0 ft. of Mean Higher High Water
Adjacent*to shorelines zone
00
Envi'ronmental Assessment, page 2
3. Vegetation:
Type of trees % to be removed
Minimum diameter of trees to remain
Ground cover % to be removed
Proposed landscaping, if any
4. Existing Land Use within 300 ft. radius of proposed development:
Vacant
Single
Fami 1 y
Multi -
Fami I y
Comm.
Other
North
South
East
Wes t
5. Ci rcul ati on:
Estimated increase in auto trips daily
Estimated -demand for'public transportation
Degree of change on adjacent street s /V 2�:-
6.. Area of impact:
neighborhood
city-wide
regional
7. Effect on air quality: WO /V/,C-
8. thanges in noise generation: Al
/,20
00
Al
6W
a
60-2 �g,
3
FILE .78=0033
FOMI FOR [XWQ�XR/FIXAL] DECLARATION OF ffffAWT*"ff /XONSIGNIFICANICE]
Description of'proposal Building �ddition
Proponent Anchor Boats
Location of Proposal miral Way 4-71 AVIV110L, 14A/
Lead Agency City of Edmonds
This proposal has been determined to [kqyv/not have] a significant ad-
verse upon -the envirori.-icnt. An E1 S [iklis not] required under
10-1 43.21C.030(11))(d). This decision v.,as made after review by Lhe lead
nency of a co-nDletcd environm.cntal chec1dist and other information. on
file with the lead agency.
Responsible Official John A. LaTourelle
Position/Title Director of Community De . velopment
January 23, 1978 Signature
Date
780033
E N V I R 0 N M E N T A L C H E C K L I S T F 0 R M
TO ACCOMPANY PORT OF.EDMONDS AP PLICATION FOR BUILDING PERMIT
AT ANCHOR BOATS
BACKGROUND,
I .
.2.
3.
4.
5.
A
ILI
G 6 SEGUR I TY FENG I NG.
LEASE TRACT AT EDMONDS HARBOR
A�tvi-n o,4
Name of Proponent: A),ACAAVV-- -606,fs
Add�ess. and Phonip Number of Propcinent: 456 Admiral Way
Edmonds, Washington 98020
Tel. 774-0549
'Date Check)ist-S.ubmitted: May 11, 1977 -"TAkf*A - ;ZV, IAI*.
Agency Requiring Checklist: City of EAonds
Name' of Proposal, if applicable: P43;i-Q Q)Qd "noing a �tract
SWILMINOC 1FA ,
to Anchor Boats,.Inc.' IF.
Nat're and.Brief Description of the; Proposal (inc'luding but not,
limitted to its size, general design elements, and'other fi�ctors'
that will give an accurate understanding of its scope and nature) -
a. 'Perform finish grading, place c'
rushed rock base and -pave with
asphalt concrete an aggregate area of.approximately 1685 square
yards., to provide (1) improved access ways for moving boats into and
out'of open storage and exhibit areas and service building, and (2)
more usable operations area; and BUAI-v 5MA-14- Offlcv� AtPVr10l`A
b. Install approximately 435 lineal feet of 6-foot�high chain_LdLnk I
security fence, with 3 gateways, . as protection againsterev
theft and vandalism. b%kA"t> 5rj\ALI�- W;>Gc- Avpj- /otk<ff�
Loca':tion of Proposal (describe the physical setting of the pro-
posal, as well as the extent of the land area affected by any
envi:ronmental Impacts, Including any other information needed to
giveian accurate understanding of the environmental settir-g of the,
oroppsal):
A tract.100 feet wide by 360 feet long -situated between Admiral Wa
y and
Burl'ington Northern Railway Company RIW, comprising'Lots 1, 1 2 and 3
of preliminary plat.,,copy attached. This land formerly wa ' a part of
a.barrier tidal slough owned by Burlington Northern, and reclaimed
by landfill from dredging of the Port of Edmonds South 11arbor moorage
b,2sin� in 1962. Since that time it has been zoned CW,;',and used first
jfbr boat trailer parking, and thereafter a boat sales center, with
a building basically 40 feet wide by 90 fe , et long, with an.,attached
offic�e ell 20 feet by 30 feet, as depicted on the attached drawings.
The plite has supported no vegetation except an occasional weed patch.
Someillimited ground area.has been paved, but the greater part of the
�iB unpaved, and with inadequate gravel surfacing;over,the original
area,
oand'fill. The ground topography is flat and poorly drained. GreatZy
increased operational activity has resulted in creation of -extensive
Tud holes during rainy weather, creating unsuitable conditions for
Present and contemplated operations, as well as being unsi'
qhtZy and a
nuis�znce to operating personnel and prospective.buyers.
tantial and
Anchor Boats., Inc., now maintains -at this site a subo
costly inventory of boats available for saZe and delivery. Losses
from theft and vandalism necessitate the installation of security
fencing. Phis is to.be of heavy duty gaZvani�;(-.-�d chain -link fabric3
connecting.on t.he-north to 'similar exidting-,,ecurity fencing previously.
installed by Boat. Loft�* Inc. The security,fencing will be compatible
with its surroundings.- but also will be made more, attractive by
selective evergreen plantings along'the.portion exposed to view from
Admiral Way.
A 7vo is offiC-�E ADPrrtof4 -1-0 B-f, j�
OA
GC
Yes Maybe No
f Alteration 0 t: the direction or rate o
flow of 9 round.. w a te rs,? X
(9) Change in the quantity of ground watc:rs
either through.direct additions or withdrawals,
or through interception of.an aquifer by cuts
or excavations? X,
('h Deterioration i'n ground waterquality,
e,ither through direct injection, or through
the seepage of leachafe, phosphates, detergents,
water.1borne virus or bacteria, or other sub-
s;tancos -into the ground -waters?
X
0 Reduction in the.amount of water other-
wise a.vailable for puo'l'ilc Water supplies?
X
Exo1anation: The'�,general surface drainaq e pattern
will remain
unchanged., but runoff wiZZ be mildly accelerated by the
r�_gr_aTi_ng
to eliminate puddles and mudholes,, and by the increase
in the
propoIrtionate area of paved areas.
(4) Flora. Will the proposal result in:
(e). Change in the diversity of species, or
numbers of any species,of flora (including
trees, shrubs, grass, crops, microflora and
aquatic p.lants)?
X
(b Reduction of, the numbers of any unique,
raze or endangered species of flora?
X
(c.) Introduction of new species of flora
into an area, or In a barrier to the normal
replenishment of existing species?
X
(d) Reduction in acreage of any -agricultural
crop?':
X
Eyplanation: Landscaping will incZude pZantinas of,
selected
species of evergreen vegetation -with optirmult aesthetic
value.
(5) Fauna. Will
the
proposal result
in;
(a). Changes
in
the al''ersity of
species or
Yes Maybe
No
numbers o f e s f fauna (birds, land
any 5peci 0
an i ma Is i nc I u,d i rig repti les, fish and 5hel I fish,
benthic organisms, insects or micro-fauria)?
X
(b) Reduction of the numbers of any Ulli(.JUL�,
rare or endangered species of fauna?
-7-
X
(c) introduction of new species of fauna
into an area,,or result in a barrier to the
migration or movement of fauna?
X
(d) Deterioration to existing fish or
wildlife habitat?
X
Explanation: None entailed.
(6) Noise. Will the proposal increase existing
noise ]eve Is?
X
Explanation: None entailed.
Light and Glare. Will the p roposal produce
new,light or glare? X
Explanation: None -entailed.
(8) Land Use. � Wilithe proposal. result in the
�;-Iteration of the present or plinned land use
of an area?
Explanation: None entailed..
Yes Maybe
No
(f) Changes in.depoSiLion or erosion of t)each
sands, or c.hanges in si Itation, depos.i-tion or
erosion which may -modify the channel ofl,.a river
or stream or the bed or the ocean or any bay,
inlet or'lake?
X
Exp lanation:. (b)(c) The existina poorZq (Irained groun&-surface will
—FxF
be moderately resha ped to she surface water efrect-bvety to an
a t in g
drainage swale on the east. Critical �Ortions of the access and
operatibnal areas will be baYlasted and pavea to support wheel
-loads and preserve the surface.
(2) Air.. Will the -proposal result in:
(a) Air emissions or deterioration of ambient
air quality:
X
�b) The creation of objectionable odors:
X
(c) Alteration of air movement, moisture or
temperature, or -any change in climate, eiLher.
locally or regionally?
X
Explanation: None entailed
(3) Water. Will the proposal,result 0:
(a) Changes in cuerents, or the course or
direction of water movements, in e ither.mari-ne X
or fresh waters?
(b) Changes in absorption rates, drainage
patterns, or the rate and amount of surface
water runoff? X
(c) Alterations to -the course of flow of
flood waters? X
(d) Change in the amount of surface water
in any water body? X
(e) Pischarge into surface waters, or i n.
a ny-alterat . ion of surface water quality,
including but not.limite.d to temperature, X
dissolved oxygen or turbidity?
9. List of all, Perm1 ts Li censes or Go ve rnmen L Approva I s Requi red for
the Proposal. (federal:., s-tate and local. -- in.cluding rezones)
(�-ij Approved bu Amenities Desion Board NaU 4. Z977.
(b) guildina Permit a12121ication submitted J.L)vil '19?7.
pending. R-Mrr, 5 w6rn I ITF-V 12. -
;BLOC.- Or,
'.101. Dol.yo'u have any plans for future addiLions, expai.ision., 'oi- fur'Lher
activity related to or connected with this proposal? 11 f yc�s
&xplain:
FjnaZ detaiZed Zgndsa4 f=nighad to Amenitie,- pesi"_
WjW 121an to hp
Bbard,
.1 1 . Do� you know of any plans by others which may affect th6 property
covered by your proposal.? If yes, explain:
12. A,ttach any other application form that has been completed regard-
ing*the proposal; if none has been completed,. but is expecL ' ed to be
fliled;'at some future date, describe the nature of such appl,ication
form:
N6ng
111. 'ENVIROVMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
Yes Maybe No
(1) Earth. Will.the proposal result in.
(a) Unstable earth conditi.ons or in� changes
i6 geologic substructures? X
(b) Disruptions, displacements, compaction or
ove rcove r i ng of the soi I ? Y
CC ) iChange in topography or ground surface
�,,-Iief features?'
(d) 'The -destruction, covering or modification.
of-, any unique 'eo.logic or physical feaLureb? X
9
(e,)' 'Any increase,in wind or water erosion of
spils, either.on or off the site? X
Yes '
Maybe � No
. `
(9) Natural Kes"�fi=, W/| the prmpo�ua| resu/i in/
.
(a) Increase inthe rate of use of any natural
resources?
X
/b\ Depletion f '
, ' o an� nomrenewab|e natura|
resource? .
X --
Exp|anation/
. 7tai Zed.
'
U) (i
` ^ n/sn or Does the proposal involve a
'
o
risk r an e�plos�o/�mr the release o[ ha�ard-.
^
ous substances (including, but not limited to
Oil, Pesticides, -chemicals or radiation) in' ,
the event of an accident or upset conditions?
_X_-
Ewplaoatimm:
zpd-
'
.
`
'
/|7) Pm | �| Will �h� proposal alter the
-----
/mcaL|.,n, distribution, density, or growth
rate of the human Population of an arma/ �
Explanation:' '
'
(12) Housing.. Will the proposal affect existing.
`
�---
"wu^/ng, or create a demand for additional
housing?
_-X-_
[ Explanation:,-
�
.
Yes Maybe No
(13) Transportat ion/C i rcU I at i on Wi I I the p r�:jpo,� a I
resu I t i n:
(a) Generation of additional vehicular
movement?
X
(b) Effects on existing parking facilities,,
or demand for new parking?
X
(c) Impact upon existing transportation
systems?
X
(d) Alterations to present patterns of
circulation or movement of people and/or qoods?
X
(e) Alterations to waterborne, rail or air
traffic?*
X
M Increase in traffic hazards to motor
vehicles*, bi.cy clists or pedestrians?
X
Explanation: Npna gntaiZed.
(14) Public Services. Will the proposal have an.
effect upon, or result in a need for new or
altered governmental services in any of the
following areas:
(a) Fire protection?
X
(b) Police protection?
X
(c) Schools?
X
(d) Parks or. other recreational facilities?
X
(e) Maintenance of public facilities.,
including roads?
X
(f) Other governmental services?
X
Explanation: None entailed-
(15) Energy. Wi I I the p ro'p'osal re.sult in:
(a) Use of substanti'a.1 a'inounts of'fud'F or
energy?
(b) Demand upon exis ting sources.of energy,
or require the development of -new sources
of energy.?
Explanat-ion: None entaiZed.
Yes Maybe No
X
U t i I i t i e s Will. the proposal result in a
need for new systems, or alterations to the
following utilities:
(a) Power or natural gas?
X
(b) Communications systems?
X
(c) Water?
X
(d) S ewe r or septic tanks?
X
(e) Storm water drainage?
X
M Solid waste and disposal?
X
Explanation: None enta led,
(17) Human Health. Will. the proposal . result in
the creation of-'�any *hecil-th hazard or. poten,tial
health hazard (,excluding mental health)?
X
Explanation: None entailed,
Yes Ma,!be No
(18) Aesthetics. Wi I] the proposal result in the
obstruction of.,any scenic vista or view open
to the public, or will the proposal result
in the creation of an aesthetically offensive
site open to public view?
Explanation: The aitta 7,7,M ha nzada mare e7jo_qthat�galZu
attractive to public view.'
(19) Recreation. Will the proposal result in an
impact upon the quality or quantity of.existing
.recreational opportunities? X
...Expi-anation: 4e en4nymoyii- . n;C 7ein-k-;aa e7l, (ar m1*.ndex,)_ahn1212jna for)
new boats, even without a&nission'to the �oat storage yard, can
a-utinue 4 reason a2f tho 9pp-n nhnranyPar n4 tha fann�= Migah-
(20) A,rcheological/Historical. Will the proposal
rasu.It in an alteration of. a significant
archeological or historical site, structure,
object or building?
Explanation: Nnnn an*a�Zpd,
1'.11. SIGNATURE
1, the undersigned, state that to the best of my knowledge the above
information is true and complete� It Is understood that the lead agency
may withdraw any declaration of non -significance that it might issue in reliance
upon this check] ' ist should there be*any willful misrepresentation or wl Ilful
lack of full: disclosure on my part. The -Port of.Edmonds, as an initial Agency,
under SEPA, proposes a declaration of non -significance for this project w rk.
Proponent:
Attachments:
Conceptual Planting Plan
Project. Plan, Dwg. 3-55EN
Preliminary Plat, Burlington Northern, Inc.
(Purchased by Port of Edmonds)
14
kil
vf
.4
� 11
IN
44 .1
Aj.
1-2
...... .....
IT
U 11
LM... ... ...
AL
;4-4
In
rf
T�
7 -1 '2
FILE #
FORM FOR MMDM- DECIAWTION OF XXXK=K/iNO,\TSIGI\IIJ,IC)V�CF,-]
Description of proposal Grading, graveling, paving and fence.
Propcment Anchor Boats,_Inc.
Location of P"roposal, 471 Admiral Way
Lead Apency City of Edmonds
1his proposal has bec-n Octe-Lni-ned to [hmx/Tiot havel a sianific,ant- ad-
1 0
verse 11pon environ"'icnt. An El. S ��is not] reqUired undo-C
L
RCTI 43.21C.030(2)�'(�). This clecif;inn v.,as iiia-cle after review by I -lie lead
agcn.,.), of a con-q)Ictecl oiyvironi,,crital chechlist and other inforiiiation on.
file with the le --id auency.
ResponsibIc Official E. Joseph Wallis
Posj.tioj�/Titje Director of Community Developmer�t
Date May.24, 1977 aff4e
/010"
RECEIVED
E N V I R 0 N M E N T A L C H E C K L I S T F 0 R M
MAY 16 1977
City of Edmonds
C&nmunity Devel. Dept,
TO ACCOMPANY PORT OF EDMONDS APPLICATION FOR BUILDING PERMIT
FOR ASPHALT PAVING & SECURITY FENCING
AT ANCHOR BOATS, INC., LEASE TRACT AT EDMONDS HARBOR
1. BACKGROUND
1. Name of Proponent: Port of Edmonds
2. Address and Phoni� Number of Proponent: 456 Admiral Way
Edmonds, Washington 98020
TeZ. 774-0549
3. Date Checklist Submitted: May 11, 1977
4. Agency Requiring Checklist: City of Edmonds
5. Name of Proposal, if applicable: Paving and fencing at tract Zeased
to Anchor Boats, Inc.
6. Nature and'Brief Description of the Proposal (including but not
limited to its size, general design elements, and other factors
that will give an accurate understanding of its scope and nature):
.a. Perform finish grading, place crushed rock base and pave with
asphalt concrete an aggregate area of approximately Z685 square
yards, to provide (1) improved access ways for moving boats into and
out of',open storage and exhibit areas and service building-, and (2)
more u6-able operations arta; and
b. Install approximately 435 Zineal feet of 6-foot high chain Zink
security fence, with 3 gateways, as protection. against prevalent
theft and vandalism.
7. Location of Proposal (describe the'physical setting of the pro-
posal, as well as the extent of the land area'affected by any
environmental impacts, including any other information needed to
give an accurate understanding of the environmental setting of the
proposal):
A tract 100 feet wide by 360 feet Long situated between Admiral Way and
Burlington Northern Railway Company RIW, comprising Lots Z, 2 and 3
of preliminary plat, copy attached. This Zand formerly was part of
a barrier tidal slough owned by Burlington Northern, and reclaimed
by ZandfiZZ from dredging of the Port of Edmonds South Harbor moorage
basin in Z962. Since that time it has been zoned CW, and used first
for boat trailer parking, and thereafter a boat sales center, with
a building basically 40 feet wide by 90�feet Zong, with an attached
office eZ1 20 feet by 30 feet, as depicted on the attached drawings.
The site has supported no vegetation except an occasional weed patch.
Some Zimited ground area has been paved, but the greater part of the
area is unpaved, and with inadequate gravel surfacing over the ori inal
9
sand fiZZ. The ground topography is flat and poorly drained. Greatly
increased operational activity has resulted in creation of extensive
mud holes during rainy weather, creating unsuitable conditions for
present and contemplated operations, as well as being unsightly and a
nuisance to operating personnel and prospective buyers.
00
90
Anchor Boats, Inc., now maintains at this site a substantiaZ and
costly inventory of boats available for sale and delivery. Losses
from theft and vandallsm necessitate the installation of security
fencing. This is to be of heavy duty galvanized chain -link fabric,
connecting on the north to similar - existing security fencing previously
installed by Boat Loft, Inc. The security fencing will be compatible
with its surroundings, but also will be made more attractive by
selective evergreen plantings along the portion exposed to view from
Admiral Way.
9. List of all Permits, Licenses or Government Approvals Required for
the Proposal (federal, state and local -- including rezones):
e,7) &2�royed by Amenities pesi�m Board MaU 4. 1977,
(b) Building. Permit a1212lication submitted APril 28, Z977. action
pending.
10. Do you have any plans for future additions, expansion, or further
activity related to or connected with this proposal? If yes,
explain:
FinaZ detaiZed Zandscapiva 12Zan to be f=niqhed to Amenitieg pasiga-
Board.
II. Do you know of any plans by others which may -affect the property
covered by your proposal? If yes, explain:
None
1
12. Attach any other application form that has.been completed regard-
ing the proposal; if none has been completed, but is expected to be
filed at some future date, describe the nature of such application
form:
None
ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
(1) Earth. Will the proposal result in:
(a) Unstable earth conditions or in changes
in geologic substructures?
(b) Disruptions, displacements, compaction or
ove rcove r i ng of the soi I ?
(c) Change in topography or ground surface
re-1 ief features?
(d) The destruction, covering or modification
of any unique geologic or physical features?
(e) A'ny increase in wind or water er6sion o" f
soils, either on or off the site?
Yes Maybe No
X
X
X
0*
40
Yes Maybe No
(f) Changes in deposition or erosion of beach
sands, or changes in siltation, deposition or
erosion which may modify the channel of a river
or stream or the bed or the ocean or any bay,
inlet or lake? X
Explanation: (b)(c) The existina poorly drained ground,surface will
be moderately reshaped to shed surface water effectively to an e sting
drainage swaZe on the east. Critical ortions of the access and
operational areas will be ballasted and paved to support wheeT
loads and preserve the surface.
(2) Ai r. Will the proposal result in:
(a) Air emissions or deterioration'of ambient
air quality: X
(b) The creation of objectionable odors: X
(c) Alteration of air movement, moisture or
temperature, or any change in climate, either
locally or regionally? X
Exp lanation : None entailed
(3) Water. Will the proposal result in:
(a) Changes in currents, or the course or
direction of water movements, in either marine
or fresh waters?
(b) Changes in absorption rates, drainage
patterns, or the rate and amount of surface
water runoff?
(c) Alterations to the course of flow of
flood waters?
(d) Change in the amount of surface water
in any water body?
(e) Discharge into surface waters, or in
any alteration of surface water quali-ty,
including but not limited to temperature,
dissolved oxygen or turbidity?
X
X
X
X
Yes Maybe No
M AlLeration of the direction or rate,of
f low of ground waters? X
(g) Change in the quantity of ground waters,
ei th6r through direct additions or withdrawals,
or through interception of an aquifer by cuts
or excavations? X
(h) Deterioration in ground water quality,
either through direct injection, or through
the seepage of leachate, phosphates, detergents,
waterborne vi rus or bacteria, or other sub-
stances into the ground waters? X
M' Reduction -in the amount of water other-
wise ava.ilable for public water supplies? X
Explanation: The qeneraZ sur
-face drainade Pattern wiZZ remain
unchanged, but runoff will be mildly accelerated by the r�_gr_aTi_ng
to eliminate puddles and mudholes, and by the increase in the
proportionate area of paved areas.
(4) Flora. Will the proposal result in:
(a) Change in the diversity of species, or
numbers of any species of flora (including
trees,.shrubs, grass, crops, microflora and
aquatic plants)?.
(b) Re�duction of the numbers of any unique,
rare or endangered species.of flora?
(c). introduction of new species of flora
into an area, or in a barrier to the normal
repleni shment of existing species?
(d) Reduction in acre'age of any agricultural
- X
PRO
X
crop? X
Explanation: -Landscapinq will include plantings of selected
. I -
species of evergreen vegetation -with optimum -aesthetic value.
(5) Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or
so
to
Yes Maybe No
numbers of any species of fauna (birds, land
animals including reptiles, fish and shellfish,
benthic organisms, insects or micro -fauna)?
(b) Reduction of the numbers of any unique,
rare or endangered species of fauna?
(c) Introduction of new species of fauna
into an area, or result in a barrier to the
migration or movement of fauna?
(d) Deterioration to existing fish or
wildlife habitat?
Explanation: None entaiZed.
X
X
0
X
(6) Noise. Wi.11 the proposal increase existing
�noise levels? X
Explanation: None entaiZed.
(7) Light 4nd Glare. Will the proposal produce
new I ight or glare? X
Explanation: None entailed.
(8) Will the proposal result in the
alteration of the present or planned land use
of an area? X
Explana'tion: None entaiZed.
00
to
Yes Maybe No
(9) Natural Resources. Will the proposal result in:
(a) increase in the rate of use of any natural
resources?-2 X
(b) Depletion of any nonrenewable natural
resource? X
Explanation: None entaiZed,
(10) Risk of Upset. Does the proposal involve a
risk of an explosion or the release of hazard-
ous substances (including, but not limited to,
oil, pesticides, chemicals or radiation) in
the event of an,accident or upset conditions?
X
Explanation: Nong ente7iZed.
(11) Population.. WHI the proposal alter the
location, distribution, density, or growth
rate o� the human population of an area: X
Explanation: Nnno_ an*t7iZed.
(12) Housi-no. Will the proposal affect existing
housing, or create a demand for additional
housin6? X
Explanation: Nonp Pnl-aiLgd.
Yes Maybe
No
(13) Transportation/Circulation. Will the proposal
result in:
(a) Generation of additional vehicular
movement?
X
(b) Effects on existing parking facilities,
or demand for new parking?
X
(c) impact upon existing transportation
systems?
X
(d) Alterations to present patterns of
Circulation or movement of people and/or goods?'
X
(e) Alterations to wate'rb.orne, rail or air
trafficT
X
(f) lhcrease in traffic hazards to motor
vehicles, bicyclists or pedestrians?
X
Explana'tion: Nong antailad.
(14)� Public.Services. Will the proposal have an
effect ' upon, or result in a need for new or
altered governmental services in any of the
following areas:
(a) Fire protection? X
(b) Police protection? X
(c) Schools? X
(d). Parks or other recreational facil ities? X
(e) Maintenance of public facilities,
including roads? X
(f) Other governmental services? X
�Explanation: None ente7.i Z d.
Yes Maybe No
(15) Energy. Will the proposal re.sult in:.
(a) Use of substantial amounts of fuel or
energy.? X
(b) Demand upon existing sources of energy,
or require the development of new sources
of energy? X
Explanation: None entailed.
06) Utilities. Will the proposal result in a
need for new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communication.s systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
M Solid waste and disposal?
Expl-anation: None entaiZed.
X
X
X
X
X
X
(17) Human Health. Will the proposal result in
the creation of any health hazard or potential
health hazard (excluding mental health)? Y
Explanation: None entaited.
Yes Maybe No
(18) Aesthetics. Wi I I the proposal result in the
obstruction of any scenic vista or view open
to the public, or will the proposal result
in the creation of an aesthetically offensive
site open to public view? X
Explanation: Th,0 0 LiM hp mada mrp aeatheticatlu
attractive to pubZic view.
(19) Recreation. Will the proposal result in an
impact * upon the quality or quantity of existing
recreational opportunities? X
Explanation: v2e (nr 7J1.*nde)7J-shn12U�na r)
Jf0
new boats, even without admission to the boat storage yard, can
Continue by reason--a4 -the apon charantgor nf thp- fane-i2W mpah-
(20) Archeological/Historical. Will the proposal
result in an alteration of a significant
archeological or historical site, structure,
.object or building? Y
Explanation: Nong gntaiZgd.
I'll. SIGNATURE
1, the undersigned, state that to the best.of my knowledge the above
information is true and complete. It Is understood that the lead agency,
may withdraw any declaration of non -significance that it' might issue in reliance
upon this checklist should there be any willful misrepresentation or willful
lack of full disclosure on my part. The Port of Edmonds, as an initial Agency,
under SEPA, proposes a declaration of non-Aignificance for this ol t work.
I IPORT OF EDMONQ
Proponent:
Port Engineer
Attachments:
Conceptual Planting Plan
Project Plan, bwg. 3-55EN
Preliminary Plat, Burlington Northern, Inc.
(Purchased by Port of Edmonds)
WiNDOW 45L
VA'(24 LL
~
°-�-v
' ^
�
---------------------------'------'
-%/-----� -----
7 8j�v�� ^* -
-- ----'-----
JAMES H. REID
LEROY F. MIDDLETON
C. WAYNE JONES
LLOYD H. NELSON
Rea, 7&44&a"
o4"4cWa, I".
ENGINEERS e
SURVEYORS* PLANNERS
324 Main Street
0 Edmonds, Washington 98020 0 (206) 775-3434
May 13,
1977 FZECEIVED.
File No.
3.55
MAY 16 1977
Mr. E. Joseph Wallis, Director City of Edmonds
Community Development Department Community Devel, Dept.,
City of Edmonds
Civic Center 7701--:1.27
Edmonds, Washington 98020
Subject: Building Permit for -Site Maintenance and Improvements
at Anchor Boat Site, Port of Edmonds
Dear Mr. Wallis:
In response to your letter of May 11, received this noon, I have
made field measurements, and marked on.the attached map exhibit, the
arc line of 200-foot radius from the nearest corner of the boat harbor
bulkhead. A rigid interpretation would establish that arc line as the
200-foot line -from mean high tide line, even though the top of the lower
bulkhead step, which is a*t elevation +9.Ot.is about 12 feet further dis-
tant.
These measurements indicate that a triangular area 18 feet by 38
feet, totalling approximate.ly 38 square yards, of proposed.asphaltic
surfacing lie's within 20O.feet of harbor water contact at elevation +10
feet ML LW.
The paving of this area is clearly a maintenance activity, to eliminate
mud and puddles from the main entrance to the Anchor Boat building. Yo , u
may note from the drawing that it terminates at present at an existi , ng con-
crete slab on the south and against a concrete curb and paved street on the
west, which interferes with surface water escapement and contributes to
creation of mud holes. If -inclusion of the.paving of this tria.ngular area
interferes with the issuance of the requested permit, please r , egard it as
being excluded from the present permit application, and we shall resubmit
thi s portion separately.
Can we believe that any legislator, in supporting pass.age,of the
Shoreline's Management Act, intended an interpretation of the Act'in as
meticulous and rigid a manner?
Please inform us as to the action which you feel can be taken next
toward issuance of a building permit.
Sincerely,
REID, MIDDLETON & ASSWVTES, INC.
JHR:bb
Encl. *s V4. e �id
cc: Port of Edmonds, Anchor Boat
MUNICIPAL ENGINEERING e WATER SUPPLY WASTE TRE MENT e SURVEYS & CADASTRAL ENGINEERING
AIRPORT PLANNING & DESIGN e MARINAS PORT & IND STRIAL DEVELOPMENT e FEASIBILITY STUDIES
MEMO TO THE FILE - May 16, 1977
7 t, � . ,,-
TI.-A.-77
ANCHOR BOATS. INC.
This is to verify that a review of the proposed work at
Anchor Boats does not require a Shoreline Permit for the
following reasons:
1. All surfacing is a maintenance project correcting
drainage and eliminating muddy conditions.
2. The value of the proposed fence installation is
less than the $1,000 limit stated in WAC 173-14-040
according to the letter in the file from Don
Martin dated May 16, 1977.
0
40'
I'll +
VO,
...... . . .
.
_% co
lb 0
SCALE I".= 100'
do
CITY of EDMONDS STREET FILE.
200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525
Department of Public Works
September 30, 1975
10�A
/Mr. Bill Karr
.Boat Loft
46S Admiral Way
Edmonds., Washington 98020
Dear Mr. Karr:
On September 22, 1975, Mr. Ken Kukuk, a Cross -Connection Specialist
for the City of Edmonds, conducted a cross -connection control inspection
of your facility. During this inspection, problem areas were noted and
the necessary corrections are as follows:
1. To conform with State and City regulations pertaining to cross -
connection and backflow prevention, an approved double check
valve assembly must be installed on the main service line prior
to any branching and before any yard spigot.
2. All yard spigots require the installation of hose bibb
atmospheric vacuum breakers (equal to Watts #8A).
'Attached please find (a) excerpts from the "Accepted Procedure'and
Practice in Cross -Connection Manual," which will indicate proper instal-
lation procedure. Also attached is (b) the September, 197S, copy of the
"Approved Cross -Connection Control Devices" accepted by the State of
Washington, Department of Social and Health Services and the City of
Edmonds, and (c) a copy of the City of Edmonds Ordinance #1711,. requiring
the installation of backflow prevention devices.
Mr. Kukuk will be making a final inspection on November 4, 1975,
which we feel gives you sufficient time to make the necessary plumbing
corrections. If there are any questions concerning these corrections,
please contact the Water/Sewer Department at 775-2525, extension 226.
Sincerely,
SIGNED
J. HERB GILBO
Director
KKK: j t
Attachments
T�; Tw� ., ., - - , -,.-; ,
Attadment (a)
PIT INSTALLATION OF
DOUBLE CHECK VALVE ASSEMBLY
LOCKED COVER
RECOMMENDED'
wyl
E
'INTERNALLY LOADED
DOUBLE CHECK VALVE
ASSEMBLY
'E'R
ADEQUATE DRAIN -NOT
TO SEWER
RECOMMEND PROVISIONS BE MADE
TO DRAIN VAULT
PROVIDE ADEQUATE. ROOM IN VAULT
FOR REPAIR AND TESTING
PROTECT DEVICE AGAINST FREEZING
PLUG TEST COCKS
April 26, 1974
Mr. William Karr,, President
Boat Loft, Inc.
465 Admiral Way
Edmonds, Washington 98040
SUBJECT: Marine pyster Crossing,
Dear Bill:
Pursuant to your letter of April 23, 1974, relative to
a Marine Hyster crossing on Admiral Way, the City would offer
the follayin's suggestions:
1. For compliance to State and City Codes, sirning
must be Installed in accordance with recognized
Standards.
2. A sketch of a proposed installation Is attached
for your use.
3. The City will assist you it location of the signing.
If you need any further informatim , please contact this
office.
Yours very truly,
CITY OF EDMONDS
LEIF R. LARSON
City Engineer
WJN:LRL:mir
Attachment
j, tr�
77
A
A M, 10A, a
ELLO, W,
G 16
7MR i
FMV
t
Tl�
41 t
P, -11 N5!A_ IL!
t --T 4- --4-
RICEW"D
*80AT LQFT11C1'*
465 ADMIRAL WAY 0 EDMONDS, WASHINGTON 98020 774 - 6515
April 23, 1974
Mr. Leif Larson
Engineering Department
.OL Ic
City of Edmonds 1_0L /C
I
Edmonds, Washington 98020 ric
,::2 to, a 1e, C"C'
Dear Mr. Larson,
TO
Boat Loft, Inc. is constructing a boat launcher in the Port of
Edmonds area, on our property immediately north of the Edmonds
Yacht Club. In order to most efficiently serve the public and
our customers, we will be crossing Admiral Way with boats on
our Marine Hyster. It is our desire to do this as safely as
possible, with a minimum of disturbance to the traffic flow on
Admiral Way.
During the past three weeks, we have been entering Admiral Way
through our new driveway; this same driveway will be used upon
the completion of our launcher. In order to operate as safely.
as possible we have added a rotating hazard light to our Hyster.
Additionally, we will be installing two convex mirrors to allow
full visibility both North and South along Admiral Way prior to
entering the street from our property. In our opinion, and that
of Safety and Supply Company, these steps which we are taking are
as much as can be done within the area under our control.
To afford the maximum safety to the public, perhaps your depart-
ment could assist us with suggestions. Mr. William Nims has met
with me to discuss this and has been most helpful.
We will appreciate any assistance you can offer.
WK/pd
Very truly yours,
William Karr, President
BOAT LOFT, INC.
ENGINEERING REQUIREMENTS FOR COMMERCIAL
AND APARTMENT BUILDING PROJECTS STREET FILE
Boat Loft Inc.
Name Monorail Boat Launcher
Date March 25, 1974
STREETS AND ACCESS
1. Right -of -Way Requirements: 60' existing
2. Road Bed Width: N/A
3. Turn Around: N/A
4. Sidewalks: N/A
5. Parking Strip: N/A
6. Access Easements'- None
UTILITIES
1. Water Mains: N/A
2. rire Hydrants: None required
3. Sewers or Septic Tanks.'- N/A
4. Drainage: Install all necessary storm sewers and drainage facilities
per drainage plan and City Standards. Where drainage is across adjacent
private property, all parties having any ownership interest in the lands
tieing developed shall provide, as a restriction on th " e title running with
the landt that the City of Edmonds shall be held harmless from any and all
claims for damages which may be occasioned to adjacent land by reason of the
construction and operation of the drainage system, unless, releases of
damages and/or drainage easements are obtained from the other property owners
affected by said drainage. Any drainage problems created by change of contour
during development must be corrected, prior to occupancy permits or release
of performance bond.* Final approval (or release of bond) will be withheld
until actual drainage as installed has been inspected by -the City Engineer.
Engineering Req ents for Commll
Apartment Buildoo Se 2
5. Utility Easements:
6. Underground Utilities: To be provided in accordance with Ordinance No. 1387.
Street lighting shall also be provided with the necessary street light
standards and underground wiring.
TOPOGRAPHY
1. Excavation and Grading: Excavation and grading shall conform to the requirements
outlined in Chapter'70 of the Uniform Building Code, latest adopted edition,
Vol. 1. Where extensive gr4ding and fill are involved in the development, a
grading plan and specifications shall be prepared.
QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS
11.02.025(f) Utilities and Street Improvements. No building permit shall be
issued for the construction of any building or structure of any kind or
description unless the plans and specifications include the construction for
clurbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and
storm drainage necessitated by the new construction or improvement, to be built
to applicable City standards, provided, however, if found by the City Engineer
to be impractical to construct at the time of application for said building permit,
construction may be waived by the City Engineer and in lieu -thereof a performance
bond filed with said engineer to cover the estimated cost of construction to City
standards for said improvements, provided further, in areas zoned singlefamily
residential at the time of said application for building permit in which the
applicant has received final approval for a plat or sub -division and has compiled
with requirements therein compliance with this subsection shall be deemed by
compliance with the sub -division or plat requirements.
COMMENTS
Rev. April 2, 1971
MW
E
T
STREE FILE
Amenities Design Board - Regular Mept ng - Februar 27, 1974 - Page 3
T;ie Ch irman declared a IU minute rec-3s at 9:25 p.r
Fr)llow,ng re�.ess the Cnairman stated rhat thL� last two items on the agenda, which
would r,-quiry a short time to hear, w,juld be heard f rst.
AOB-9--1 Walt Lester. Addition to b iness sign (e,,istina sign) at 1047
L 11 - -
Puget Drive. (BN)
Mr. Wallis showed slides of the exist ng sign and the site. He said that "r.
Lester had stated that because of a p,evious comrnittmpnt he could not be at the
hearinc until later in the evening.
fir. Wallis explained the application. The new sign will have landscaping at the
base and will ue in conforyunce to th( BN sign regulations.
IT WAS MOVED BY MR. GOLDSMITH, SECOND, ) BY MR. WESTLIN IHAT Ar)9-9-74 BE APPROVED
A', APPLIED (:arripd unanii ously.
A16-8- Boat Loft, Inc. at launc: in(i faci,ity for public launching and
- Of C
; C ; rriFs__Iff 80' a! of t. 46 Admiral 'day. (CW)
Mr. Wallis presented slides of the si e and rp;iewed the application.
Bill Karr, Boat Loft, Inc. was in the -i ud i ence . ;if, explained to the Board that
this was a monorail launcher with a m, rine for� I �tt to bring tho boats from the
loft across the street for launching.
Mr. Goldsmith asked Mr. Karr if the P( rt of Edrionds intends to acquire the property
and he said he did not know.
Paul Roy, 844 Alder Street said this vds greatly needed in the summer. People
stirt lining up at 3 A.M. In order to use the one launcher that is there at the
Port of Edmonds.
A mOTION WAS MADE BY rIR. WESTLIN, SEC(NDED BY MR. RIZZUTO THAT ADB-8-74 BE APPROVED
AS APPLIED FOR. Motion carried unanirously.
ADB-6-74 Alaska Publishipg, Binding, Distribution and storage of pertinent
ffiafeHaTs ui�_d_jn the publishing of printed m.:4tter. 130 2nd Ave.
Immediately north of existing building formerly Crow Hardware. (BC)
Mr. Wallis showed slides of the site and said this was a preliminary review asked
for by Harbor Construction.
Bruce Beard, Harbor Construction was in the audience. representinq Alaska Publish-
ing. He explained that this was a temporary Structure which would be a steel
structure. It would have trim of sandstone material the same as the existing build-
ing. Landscaping and walkways would be install,�d. Mr. Beard said thty do not
have landscape plans at present but would prepare them. He said this is a problem
area as the water table is high. All structural work must be done on pilings. The
building primarily will be used for as'iembling, binding and shipping of printed
materials.
Paul Cook said if the applicant wants t metdl building then they should attempt
to screen it as much as possible.
Mr. Beard said they asked for the preliminary hearing in order to get as much
input from the Board as possible for guidance a,, to what they wanted and would
accept.
mr. Wallis said a traffic count had shown appro�imately 600
1-9�1_ars a
fie suggested that the building locition be7hanged a. Ty.tr_,
c
Sunset 'day. a e rm 1
sfalled. This would soften the impact of the biilling.
P, �5 0 K)
ENGINEERING� REQUIREME14TS FOR COMMERCIAL
AND APARTMENT BUILDING PROJECTS
Name Boat Loft, Inc.
Date February 12, 1974
STREETS AND ACCESS
1. Right -of -Way Requirements: None 60' existing
- 2. Road Bed Width: 44'.Existing
3. Turn Around: N/A
4. Sidewalks: N/A
5. Parking Strip: N/A
6. Access Easements: N/A
UTILITIES
1. Water Mains: 8" C.I. existing
.20 Fire Hydrants: None Required
.3. Sewers or Septic Tanks: Connection to sanitary sewer required
STREET
-FILE
4. Drainage: Install all necessary storm sewers.and drainage facilities
per drainage plan and City Standards. Where drainage is across adjacent
private property, all parties having any ownership interest in the lands
being developed shall provide, as'a restriction on the title running with
the land, that the City of Edmonds shall be held harmless from any and all
claims,for damages which may be occasioned to adj acent land by reason of the
construction and operation of the drainage system, unless, releases of
damages and/or drainage easements are obtained from the other property owners
affected by said drainage. Any.drainage.problems. created by change of contour
during development must.be corrected.. prior to occupancy permits or release
of performance bond. Final approval (or rellease of bond) will be withheld
until actual drainage as installed has been inspected by the City Engineer.
Engineering Re ir ents for Commll &
Apartment__Bui oj5ft- - Page 2
5. Utility Easements: None
6. Underground Utilities: To be provided in accordance, with Ordinance No. 1387.
Street lighting shall also be provided with the necess ' ary street light
standards and underground wiring. Street lighting not required
TOPOGRAPHY
1. Excavation and Grading: Excavation and grading shall conform to the requirements
outlined in Chapter 70 of the Uniform Building Code, latest adopted edition,
Vol. 1. Where extensive grgding and fill are involved in the development, a
grading plan and specifications shall be prepared.
QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS
11.02.025(f) Utilities and Street Im
provements. No building permit shall be
issued for the construction of any building or structure of any kind or
description unless ' the plans and specifications include the construction for
cbrbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and
storm drainage necessitated by the new construction or improvement,' to be built
to applicable City.standards, provided, however, if found by the City Engineer
to be impractical to construct at the time of application for said building permit,
construction may be waived by the'City Engineer and in lieu thereof a performance
bond filed witli said engineer to cover the estimated cost of -construction to City
standards for said improvements, provided further, in areas.zoned singlefamily
residential at the time of said application for building permit in which the
applicant has received final approval for a plat or sub -division and has compiled
with requirements therein compliance with this subsection.shall be deemed by
compliance with the sub -division or plat requirements.
COMMENTS
Rev. April 2, 1971
Z!-ilty Tngineer
EETT.'.
J.-
"ET I
EDVONDS COUNCIT-1-1 -NG 1 fill ThS
FEBRUARY 9, 1,�474
J)W (;o "111 C �i I. ill �q I I I t; e l 1
to J)tt:.� C
0 '1 ill e
�Com ic Uman 11'eloon mov,;!d, rj(-,cviAod
Ill, 0 1, 1 A C .3 n 1 11 1 11C, MJ) � by ado i ing C."hSt,'i f'�.(;Zgtjr)jj C) L.
MU] tiL
newly ltrineiiced pi-operty, to be voiled -Fanvily ReFAdential., low
cortain
i- t Y OPIll') mo t i o I I C " I V. 1, i e el
Cou Jj I;L;(,I) tj virl (50cond-'-d by Cmiricilmaij Wizitel-ij I;Q ptair;
nc ilm wi I 'll Inn 11 C, (I 4i gr�
b rd.J. tvan c o #10 wn e "1 (3 11 L", 11 r� 0 L" f I /'c 11 i 11 J'r "a jj , L
f:j 1�; 'N t r) 1) "Q r. C; o r t�,) j 1) pro 1) o 1, Y I i u %q 1. y Fj rl 1-1 e X.I.- J , tO bo": Y.011ed -:-F;Jmily�
6,000
`0LiIT.i3OPJ RDJARDING AME'l IET.U-),
HEARING ON ADOPTION 01' PiMINING WIVI-I'SION RE,
DES I G BOARD PROGEDITPES AND CRITERIA
Wal s , -d bad me t last night arid
connented i;hat tile Design Bl�ai
City Plailliel: , Jor �Li ,
I
thai, ho' was very plerit3ed at hnw t1le F� -ird is furictioning so far. - Co 11 Yin i
d tilat
-evjewr�d the propocled ordinance Zvi it was acceptable
Gelle-rt r;aid that 'ne Ila,` i
to hi:n. Mr. LaTovrell 7,aid Itriat 'it, i,;Id lj,� Enard vv--lild con(ur. aring
i.s wa:-I an ortJ4 rj 1 .6 i aild
viaf� op,,,ned. 11r. Paul ROY 010uj�ht B Lriance to, con, , dc p
ay Starr thought the n��view process would delny rrlafl�[,:.
war; not in fe'vo I., Cf j. t . J,
pro i6ct:�; and j ricrease CQStl� Mr. YI(;COtljI�,,Ali 0 1-c�Irl"'irkud that Ine bel i ill more
-atl iel than controlling dc-Aeii. Jim Mueller tztaled th6t ile
indiviclual des-ign x !
-C tjLj nks people appreciate what Edmonds
would like to speak for tile or linance as h6
-it i to d ond
was and is, antl that thfij, have R right to have a voice ill whL -appens E rn 0
id not believe in doAgn control. Mr. Morris
art -in comrnente,! th"JLL�jp
Vr. Jji :r. Y,
-ovi ew f rocedurc would take
Ba,� said tliat' he was concerned about how long the r 1)
Follow; rig comment s from thL�,- a,ld-1 ence, the h�,ari ng was cloced.
-t an(i :iecor,dt i 1,
A rroti,on wa.-, ina6e I.%,, Councilrn-ui G,011ei
.1"'IL V L -W 'by
to a"d
t "' l e Ai"JerIlLtj Q;1 OP hIly 1)U ll�!, or,
f 01 t,;Cj?rlr)rjrjj� j Ile, ::1i IlL7"I fl,:!, i I y r�-ti ;,d,;llt j L"t dw�! I 1 1 m!.1 11 prQ1-
rep isi t e to L ljt� i t;s, ia nC k,' Of b 1131.1 i Id ink Ft-- L Ull t b1l d, C I el5ti.111' E4 ii--�w cli-,jptor 112 .20 r
-ion of Plarminv� Comm, �5sion Reso I u t Lo n 1/397.
iii, the Edmonds Ci ty Gode in tiodi ficaf.
mon,� discul..'sion foll.owed. A voll call. vo�.�? j-eskil I,!d in Wpili:,K, Gell,�vt 11hippen
IT
s"; and Nelson, NovdquTst a -lid Winters v ting "ilo'
and Andernon voting "p.
01' RE-1JEF To �-IOAT WFI!, IINU. AND DEUElY LHYL)A 1,�i;GARDITIC, BUTIDI 1
-r, -,It he "J� 0 aj�e building
Bi 11 ELa�t owivir of iloil t� joft Ltic . stated t)'j, 'j ,ite 'IL 6 1;0 1'
fron; th". Council
the,ground ruady to be. pi�' up ula th;,' hf- wu�ld lAkc potrt,i�,�3
o proce-20 on the i r� ') f' PILanp, thaL li�lvv alrea(3y bo(�n apjjrov,�d b.1 Ue 131A ing�
-Department . PIWIller Wal, Ij s r3howerl sl :i des. of thn r.xiF.;tjng nLYL-Octure oil 0
p
�Bo.,it fot't propr-l-Ly. Thr, propoe.od StroctLWO ill to 11(� L r:alrie ond
with what s alreody i� �i c� n:, . A rnotion was made by C(lurin.i.1mori Winters and r3e��dhded
-hoir pe rmit
by Councilman Nelson to allow Boat ioft. go ah:t,�ad with i.
witho . ut any morc d,�I, iy. . Motion cal-ried.
Id -ig t( -r, o J' t!) u ri C! i and
�)ewey Leyda ph�Ao�,rapl,s cf h. bu
explained what hf, int, elided to do. A rrio ti on was IllIdu by Coi�ncilman flelrion and...
d
seconded by C Dewe.-I Ley a" a.
ouhcilmon N'or6quLi3L to accept tht I gn o n
QXOMpt II.IfIlL frof(I J;)I('
lljQj:,atnrJuni contingent upon his the I'luildinG Department.
reqlli . rernorit.,3. Motion car,ried.
t 3
-ntle,,.,i;,Li rejjlvt�uiil, i.ng th" Tu,.-key which is e on Hi gLvav C49
A g(
trple C ty 0
-?d tbat lie had submi t ted plwi�� to 3 Fdmo rid.0
adjacent to Docieo. sta,
some four mont�,L-j ago and th(,,,- had been approliud. Ki rljajol� C,.C)jLlCk;f�jj a, ni)nient:
m for e bu3ineso- The �31gri will its design, etr. i,mrj di:,;ruz,,,vA &t; length.
s a s i
Councilman wintoru mavcd, --,Oconded by Councilman Anderson to ;-,nant' relief to
Tv rk e y House from the irnratoriiim. ., Yollo,.,!ing more discussion, ti,e motion ca� ried.
SQr;OrjjU(j l)y Cou e
Counci iman Winters made a mdjon, �,Or; tC)
Ro"I to Com'j- before, couricil at tile next, Inc!eting to sf�ek velief op-j 11fr!
Notion carried. Gouncilm,--ui Gellert voted "no".
E, D M 0 N D'; CIL ME E I I N G MINUTES
JANUARY 29, 1974
-6-
MUSSION ON BOAT� L6f- I 4C.
Bill Ka r r , owner o f Boat Loft, 1ric. on Admi ra I Way had written Mayor and Council to
re(Idest,exclusion 11ruiii the moratorium placed by council on building perinit applica:-
tjons. He staUd that he recognized the legality of the situation,, but had (6,'
specific problem and asked for- rel ief.. There, followed discu-�sion, on the type f
structure which Mr. Karr was planning to erectj and that it was*indefd in keeping
with �the surrounding area, being exactly the same as the.one already there oil the
property,' and to be placed in back of the present building.
dVi';ed tila t h. grant air
'if was the only:hody w ;ch could
City Attorney Wallace a ouoc
:exceptlon to the moratorium. Councilman NQlson suggested that Boat Loft, Inc.
suhinit drawings, etc. and plans 'to the City Clerk before Friday so that couric i I
�ts and use
could receive thein in the mailing of the council packL -this for gui.de
-quest for exception next week. 'If Mr.., Karr does
i nes in order to decide on the rc
s moved by
this, council will give him art answer at the next meetinq It wa
COUnc i I (naii N,,,Isori, seconded by Councilman Anderson that Boat LoLtjn.�.. tL(I
�to brir1L±1n their desi(jr] lans to �,Ubmit to the Cit Clerk rior to lrid�i in order
_p—
J�L a t
LC;un( i'l mefler-., till (Ti v e cri for stugy n foEeKEO I —El
__�rid cort.,
iiD,, and that the' saine af)[)Iy to Oewey Ln da if fie wi 11 also 5ubinit his platis for review
I j , tjFor�i ni!x t, wf�elv Tho. motion carried.
I ON ()kU I NANCL
RL V I f"W 01' PROPO I'l) Ul�l) I V I
John Wallace advised council that this must be, reviewed by' the s ta te for
�Attbrne�
conformity before COUnCil PaSSaYC-. He thercfUre suggested tha t they rev i ew �Lh —e
P -o 0
?
spd ordinance for, in ' out at the meeting next Tuesda and following this the.
—Ee sent to the -state.
proposed ordinance wiTT
APPOINTMENT TO ROARD Of' APPEALS
Ho rri sort it( a i n Ili acco th(, name of Wadc J wiiis f-cir appo i it tinen t to Oic 8 1 r of 7
May o t oi d
Appea I s . Counci Irian Nelson asked that his motion. to delay be brought back to
ouncil for action oil his original motion to confirm the appointment. Counci lwortian
1:hippi,%n said ;he had a qui,,-.tion on the Sai I Intl Tavern.p6rkirif ' no I. bv IOg, a if juate
ii nd w i s hed t o h,i vl� My'. lairto roiiqiii�,n t o it th i % a 5� , o n t lie It;, r k I tiq s pa rf:,s fo r
-e t. -id leasi!d the Pxtr;i 'needed
the building on Main Strc Mr. James answered that tie ' h,
s -J(,( on Main Stres�t froin flock; that it was a 5 year I ea s e � Courici linan" Wc I I ing
_lie
t'j);j t
-ked what flopp,all", to Ow iii"tor Ov., five yl�,rirs. Mr, Jaiw�,
an
I (I t.fjj�fj 1)(" f o fr i rld W I I'lif �j 1w -xplaflloff
w0fl rf,.d" rl lifill't'-f. of,
th;i f, tile S pacf., F. I t, tile, '-';I i I I fill I a vfj� ro Wt! (-(� an. ov( Y,�, i on it Is p�i r t a d Oil, 4: i b/
-Harry Whitcutt stated that this was correizt., Couric *.I woman Shipperi Life,, ques ( i'oned
Mr. James on flow It(- Would lean in regard to int , erpretation of'the.c.ity code. 14. e
;I 6,,.wvrod tha t he wou I d 1) roba bly tend to he Illore. I i bera I . tha n some I fill ll(,� ff� I t -ric It
to ho i I (.Hi 11,j codq�, i � fo I ly for evcwyollo Hart ' Y, Wit i (.4.1 L t la t
:V a
f t.,� -solllo d I V 1`l,!r(:nc(1,. o F oil i rri oil he Cwc�en it fill cind Mi- ;aiiii,,s 1:P fl(lvfli-thf:� I c"S
t I
he wou I d be all exce I I eit t womber for the lioard o f Appea I s .
nded at the last ftieOAnq
Counc i I man NO ;oil theii as ked tha L it i 5 wo 1, 1 oji ,' madf? arid seco
be ac ted upon. . Counci I ma if At derson a sked for the ques t ion and a roll call
s howed Counc i I ma n Ne I son vo L i ng i n fa vor of. con f i rma t i on he four reinaining� members
against., and the motion failed to carry.
Court(: i I'man W(,, I I i vi�i no tod Lh,,j t.. he recogn i zed Wads Jilmr,,!i if,, a 11,1r. I wor Irld �.ljljs fari-
:tial member of the communi ty, but that he h!*id, a vather .'I iberal a n d va, very
lo,would
honest about it, and that he felt a inember of., i s. board should be someone wi
adhere to the rules as set forth.
Mayor Harrison then offered the name of Earl Mort -is for appointment.to the 13(,iard.
The Mayor s tated that Mr. Morri s had been a po rtner wi th Dan: Mi 11 e r for a number of
Ifle work in this'area. 'He
years and did considera, also rah an antique shop it, the�
location.where the flower shop is now. Mr. Morris lives in north Edmonds. The re
was council discussion, and,the opinion seemed� to :�e t ha t it woul'd be.of advant
age
-a) J�
Prl
- 4t"'
Ski,'
RECEIVED
JUL 2 7 1973,
ClTy OF EDMONOj
*y . . ............ .
j q
A
rl)
Q1,
%DATE RECEIVED
_
.
_ -? 7- IV
% PERMIT EXPIRE., i6aP-7- e�
111lI11iI!l1IIIWI
USE PERMIT
CITY OF EDMONDS
ZONE NUMBER
CONSTRUCTION PERMIT APPLICATION
JOB SUITEIAPT#
ADDRESS Ay m 1,eA) /,, m4v
OWNER NAME/NAME OF BUSINESS
PLAT NAME/SLIBDIVI SION NO.
LOT NO.
LID NO.
PZ) k---. -)� 0�_
LID FEE $
MAILING ADDRESS
w
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
TESCP Approl"d '0
RW Ptin., d
Flequl, 0
Pe-ft Req'd
EXISTING — PROPOSED
0
Inspection Reciflred 0
SWewalk Required 0
CITY ZIP
TELEPHONE
Ci IT
lboo
fl�
REQUIRED DEDICATION FT
Underground
Wiring reqijfred 0
NAME
METER SIZE
LINE SIZE
NO. OF FIXTURES
PRV REQUIRED
ILI
YES 0 NO 0
cr
ui
w
t:
ADDRESS
REMARKS
z
z
x
OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE
0
z
U)
CITY ZIP
TELEPHONE
NAME
110
ENGINEERING REVIEWED/DATE
ADDRESS
cc
cr
FIRE REVIEWED BY DATE
w
CITY Z77LEPHONE
t-
z
m
LL
0
L)
VARIANCE OR CU
SHORELINE OR ADFIff
INSPEC
O�ION
RE D
BOND
POSTED
SXAZI I IrIF: ICZIF N1 IKARrR h 4> - EXPIRAT77
CHECKEDBY
0`6 3,
0 YES 0 NO
SEPA REVIEW
SIGN AREA
HEIGHT
PROPERTY TAX 'ACCOUNT PARCEL NO.
COMPLETE EXEMPT
ALLOWED PROPOSED
ALLOWED PROPOSED
ILI
I
,
EXP
.;ij
0 NEW 0 RESIDENTIAL PLUMBING MECH
LOT COVERAGE
ALLOWED PROPOSED
REQUIRED SETBACKS (FT.)
FRONT SIDE REAR
PROPOSED SETBACKS (FT.)
FRONT UR SIDE REAR
0
Z_
ADDITION OMMERCIAL o COMPLIANCE OR
WC
z
z
CHANGE OF USE
PARKING
�OT AREA
PLANNING REVIEWED By DATE
REMODEL 0 APARTMENT 0 SIGN
REO'D I PROVIDED
MVR PAIR GRADING Cyr), (D FENCE
S X FT)
REMARKS
DEMOLISH TANK OTHER
o GARAGE C3 ROETAINING WALL RENEWAL
CARPORT 'ERY
8 C,
z
(TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN:
t-
a
0L1
fy%bj�"i s+og,��e UzAdc
CHECKED BY TYPEIOF
CONSTRUCTION
OCCUPANT
GROUP
NUMBER
OF
N BE,F OF
UM LL I
OWE NG
14
CRITICAL
AREAS
w
SPECIAL INSPECTOR JAREA
OCCUPANT
LOAD
o
STORIES
UNITS
NUMBER
REQUIRED[] YES
DESCRIBE WORK TO BE DON
REMARKS
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D
P -,-" A t1-CA-1
L 4
ej
V-) r
0 v
s
/
be—
VALUATION
FEE
PLAN CHECK FEE
L
HEAT SOURCE GLAZING % LOT SLOPE BUILDING
PLAN CHECK NO: VESTED DATE PLUMBING
MECHANICAL
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
t- BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING/FILL
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE
SEPARATE PERMISSION.
SURCHARG-4
w PERMIT APPLICATION: 180 DAYS
PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
ENG. INSPECTION FEE
APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
w ;N INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
I LANDSCAPING
2 EDMONDS. WASHINGTON, ITS OFFICIALS. EMPLOYEES. AND AGENTS FROM ANY AND INSPECTION FEE
cc ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
10
I RECEIPT
x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT
0 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REOUIREMENTOF ANYCITY ORDINANCE
_j
0 NOR LIMIT IN ANYWAYTHE CITY'S ABILITY TO ENFORCE ANYORDINANCE PROVISION.- RECJIFf urel1v
, 1 TOTAL AMOUNT DUE /40729 11�_
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL
GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application is not a permit until signed by the
CALL
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Depidy: Find Fees are paid, and
IN VIOLATION F H BOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is Acknowlodged in space provided,
WORKMEN'S COMPEN AT!q�SSURANCE AND RCW 18.27. 9610 ALS SIGNAITURE DATE
'�04AGENT)
SIGNATURE (OVnNE DATE SIGNE9 (425)
771-0220 DATE"
RELEASED BY
ATTENTION' EXT/333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL F71LE YELLOW - INSPECTOR
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR