Loading...
465 ADMIRAL WAY.PDF11111111111111 10011 465 ADMIRAL WAY Guide -BKNV. August -7,: 1979 [S] R8656A. Batts and Blankets. . . - 'Inc.,. Johnson C, J.`T., Seatt le, WA 90 Glass fiber blankets with facings on one surface. Tbe following Products are eligible to bear the Laboratories' Classification Marking incorporatingth6 designation 'THC 26/60" instead of the individual Fire Hazard Classi. fication valuej of'Flame4pread, Fuel contributed. and Smoke developed: Aluminum Foil Faced Blankets Foil -Kraft Faced Blankets Foil-Scrim-Krafts Faced Blankets Vinyl Faced Blankets Vinyl-Scrim-FoU Faced Blankets Fire Hazard Classification Vinyl Film Vinyl Film Vinyl Film Vinyl Film Facing Facing Facing Facing Flame spread .25 so 20 0 20 0 Fuel contributed 50 0 Smoke developed lW160 45 55-66 66-90 (Continued on B card.) This card is issued by Underwriters Laboratories Inc. 0 61-0 ... . ........ .... City of. Edmonds --- Water Depariment TAP CARD Date ........ . ............ .... 1.122 .. ......... .. ..................... Meter Tap ........... size ......... ?& . ... ......... ,q U-)6_Lj__ Mfgrs. .4�. ��z ..... Style ... . .. . .... For............... I ............ ...................... LotNo ................................ STMET ..... FIL .. E-;- Add. .................................................. ................ . ....... . ....... . ................................. Service Location .......................... w .............................................. .................. . .................................................. . ........................... ....... . ...................... . ................ Meter Location ....... X), MakeTap ........................ ................................................................................ .. ...................................................................................... . ......................... . . ...... .......... Pressure .............................. lbs. Test ....................... ......... % SendBills to .......................... . ....................................... . ............. ................ . ..... Date of Work ........... ........................... . ........... . ......... ...................... . ZAJ�L ... Vo!reman Guar. Voucher No ........................... . ............. ................... : ........... . ... . Remarks: ..... . K. J..s ........ ...... ............................................................................................. ............... .... . . ......... OUTGOING Index ......... Reg.... --Route Bk ..... —.StenciL ..... Card._ INCOMING Index....-L.-Reg ....... Route Bk .... . .. Stencl..._Card. rial Cha r*geable to Installat lon rs A* NW NO. SIZE DESCRIPTION RATE AMOUNT ......... .......... Meter ...................................... ....... .............. .......... Meter Box ................. . ............ .............. .. . ......... . ............... .......... Meter Plate ............................ .............. . . ......... . . ....... ............. .......... Check Valve .......................... .............. . .... . ... .......... .............. * ........ Pipe, Galv. Screw . .................. .............. . . ......... .......... .............. .......... Nipples .................................... .............. . !-10 .... . ... .......... .............. .......... Bushings .................................. ............. .. . ... ...... .......... ............... .......... Plain Ells .................... a ............ .............. .. . ........ I .......... .......... . .. ... I ...... St. Ells ..................................... .............. ............ .......... .......... . ... .............. .............. ............... ............... ----------- ............... .... .... .......... .......... .......... .......... .......... ..... .......... [ .... .......... Tees ......................................... ........................ ............................ . ..................................................... ...................................................... .................... ................................. ................... : .................................. ...................................................... ................ ..................................... -------- .............. ............. ............ 7 - ............... .............. .............. .............. ............ ------------ ------------ ......... .. ... . ....... 1.� ......... .. ------ ......... .......... -- ------- -- ....... .......... ........... ........... Material Chargeable to Taps Connected NO. SIZE DESCRIPTION RATE AMO NT ............... ---------- Pipe, Black Screw . .................. .......... ... ....... T..— . . ---- - --- .............. .......... Pipe, Galv. Screw .................. ................ .............. ......... .............. .......... Lead Connections ................... .............. ........... . ......... .............. ........... Curb Cocks ............................ .............. .......... . ......... .............. ............ Corp. Cocks ........................... ............. d .... ......... ......... .............. .......... Unions .................................... ............. I ............ ........ .............. .......... Saddles ................................. ... .............. ..... . .. . . ........ .............. .......... Nipples .................................... ............... .......... . ......... ............... .......... Bushings ....................... * ---------- -- * ........... '* ... **"'- * --------- - ............ .......... Plain Ells ................................ . ............ ............. .......... .71 --------- .......... Street Ells .......................... . . ............. .......... . . .......... ............. ...... Tees .......................................... ................. ...... . . .......... -------------- ---------- Curb Boxes ............................ .............. ---------- .. ........ .............. .......... S. 0. Extensions .................... ....... ...... ............ .......... ............... .......... Gates ........................................ ............... ............ ........... .............. .......... Plugs ........................................ .............. ........... .......... .............. .......... Couplings ............................... .............. * .... . ...... .............. .............. .............. ............... -------------- .............. ........... .......... .......... .......... ---------- . ........ Gate Boxes ............................ ..................................................... ................................................... ........................................................... - ......................................................... ................................................. ........ .............. ............. .............. .......... .. ......... . .. .............. ............. ............ ............ ! . ......... . . . ....... ............. .... . .... ........... .......... .......... . ....... . ....... .............. ........... : ... .............. .............. ............... ............... .............. . ........ .......... .......... .......... .......... . ........ . ........ ........................... ............................ .. ........................................................... ........................................................... ........................................................... .......................................................... .......................................................... Hours Time —Day Men -------- .............. .............. .............. .............. .............. .............. -- ........... ------------- ............ ............. ............ ....... . ... ............ ............ - ------- . ........ .......... . ........ . ........ .......... ; ......... .......... . . ........ Hours Time —Monthly Men .. ............... ....... . ... .... ­" :::: .......... . .......... Hours Time —Auto ............ ... .............. — -- — --- ---------- .............. .......... Superintendence ...................... . ----------- ----------- --------- ............... .......... Total .................. I ........... ... CITY OF ED'MONDS PUBLIC WCPM — ENGINEERIM STREET FILE ACTION REPORT N? 1023 - SUSPENSE DATE: Da te: 8/19/82 Time: 8: 00 am File # Attachments: Yes SUBJECT: Water main leak in front of address END below. REQUESTOR: NAME: Boat Loft 0- ADDRESS: /,�5fAd.mi-r-aj1*-.Wa-yy J PHONE: n/a REQUEST RECEIVED BY: TELEPHCNE r--1 CONTACT IN OFFICE = OTHER:_ CygX called on recorder. RECEIVED BY: M. LeVan Dr)IITP Tr)- 1��M= M-M ACTION: 0(44,Nc,-azD 61--P tl R-77Z4Z bF- P M640S &R)A,-L=Aj RaQ-27- PZA Tr -- All Concerned Notified ci2� Action Completed/File MET TO .11arry 1411itcutt P,uilding n-Ifficial '00-OFFICE COMMUNI(ftN sSTREET FILE DATE 19 75 FROM "illiam 0. Ni,,,is Assistant Engineer of Field and Office SUBJECT: Permit Application 465 Admiral !'a,,r - P,,pat Storaqn Pack. Addition A review of "he permit application and related sketches indicate the following: 1. An invasion of riqht-of-way permit is re.quired for the proposed curb cut for ingress and egress to the proposed v-ehicle parHnq area. 2. The Pew curb cut will be for vehicles only. Access for hoat transportation crossing to boat launch will not be permitted. VX-1:jnjr Attachments Harry Whitcutt. Buildinp-Qfficial TO C ,gVPF DMONDS 0 5! ' H NORTH EDVOFNDS. WASHINGTON 98020 ----- - - � ­­ -- - ----- — - ------- - - --- ----- - ---- ­- ­­­ -- � ----- --- - ] 'F1 POLICE DEPT. 10 FIRE DEPT. SUBJECT REPLY REQ I DATE Boat Loft, Inc. YES NO 2-6-74 I F-1 F-1 The proposed additiow-,to theboat-Istorage racks -appears to bear out,.your requirements for a one -hour separation from the south property line. Additionally, as the.occupancy is,being enlarged, andq as it is a unique type of occupancy (in relation to normal building occupancies), the Fire Department, under authority of Section 13.301.(a) and (b), will require a system of wet:�standpipes and hose cabinets throughout. -the yard area - for the protection of the property and stored items. The standpipe systen,shall be installed per N.F.P.A. requirements and spacing, including, but not limited to, structures for the storage and protection of firefighting equipment, and to protect such systems from freezing in cold,weather., PLEASE ISIGNED REPLY TO R.H. Klein Fire Marshal T-7 I)i _ v'z �OATE SIGNED FORM NO. MEM. 88T SEND PARTS 1 AND 3 WITH CARBON INTACT, PART I IS RETURNED WITH REPLY TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): b 6Vj)emp it �g� I I V COVENANTS (RECORDED) FOR: CRITICAL AREAS: DETERMINATION: E] Conditional Waiver Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: — SCALED PLOT PLAN DATED: SEWER LID FEE $: SHORT PLAT FILE: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT WATER METER TAP CARD DATED: LID #: LOT: BLOCK: LATEMP\DST's\Fonns\Street File Checklist.doc MEMORANDUM lqclln 'r 4 Date: May 8,1996 To: Lyle Chrisman Engineering Specialist From: Ron Holland Water/Sewer Supervisor Subject: Port of Edmonds Boat Lofts In my review of this project, the only thing that needs addressing that I can see for the water utility is: I The existing meter is 5/8" in size will need to be upsized. I cannot tell what the uses will be. This might be addressed by the developer. 2. There needs to be a reduced pressure backflow preventer installed in the heater space or in an insulated box located above ground (see attached). Attachment wordata\water\ptofedm 11 1 City of Edmonds c-Q Public Works I Of tion MEN Mori 0 NEESE FAN MEMMENNE EWA No PAI MEM F MIPIA M MA N - PON, ENEK 4" 170 GPM 1n1W 5" 350 GPM ME -papa Em 'MEN 76"460GPM FORM H ON EEME!8"760GPM of with all applicable safety standards and codes in effect (See Section 5). Figure 2-8: Relief Valve Discharge Rates For Reduced Pressure Backflow Assembl - ies. RPBA Installation (Also refer to Section 7) 1. It is critical that all RPBAs be installed with adequate space consideration for testing, repair and maintenance (see Figure-2-9). All assemblies require a minimum clearance for removal of pins, check assemblies, and/or relief valves. Again, consult the specific manufacturer's installation instructions prior to installation. In all cases, consult with the responsible local water purveyor for their specific space and installation requirements. All RPBAs shall be tested after installation and repairs to insure their proper installation and satisfactory operation. 2. An RPBA installed more than five (5) feet above floor or ground level must have a platform under it for the tester or maintenance person to stand on. The platform must comply 3. When installed in an enclosure, adequate space consideration must be given for proper testing and maintenance. An RPBA shall be installed outside any enclosure or hooded area containing fumes that are corrosive, toxic, or poisonous. They shall not be installed in a pit or trench belovV' ground level, or in other areas where they may be flooded. Flooding of the pit or area could result in a direct cross connection through the relief valve port. Semi -buried pits may be acceptable (consult the responsible local water purveyor) if the RPBA is installed above the ground or maximum flood level with an approved air gap between the relief valve and (2-7) Figure 2-8: Relief Valve Discharge Rates For Reduced Pressure Backflow Assembl - ies. RPBA Installation (Also refer to Section 7) 1. It is critical that all RPBAs be installed with adequate space consideration for testing, repair and maintenance (see Figure-2-9). All assemblies require a minimum clearance for removal of pins, check assemblies, and/or relief valves. Again, consult the specific manufacturer's installation instructions prior to installation. In all cases, consult with the responsible local water purveyor for their specific space and installation requirements. All RPBAs shall be tested after installation and repairs to insure their proper installation and satisfactory operation. 2. An RPBA installed more than five (5) feet above floor or ground level must have a platform under it for the tester or maintenance person to stand on. The platform must comply 3. When installed in an enclosure, adequate space consideration must be given for proper testing and maintenance. An RPBA shall be installed outside any enclosure or hooded area containing fumes that are corrosive, toxic, or poisonous. They shall not be installed in a pit or trench belovV' ground level, or in other areas where they may be flooded. Flooding of the pit or area could result in a direct cross connection through the relief valve port. Semi -buried pits may be acceptable (consult the responsible local water purveyor) if the RPBA is installed above the ground or maximum flood level with an approved air gap between the relief valve and (2-7) 0 Types Of Back1low Prevention Assemblies Test Cocks .(4 req.) Ladde.r �:,2411 min. 12"min. Relief Valve Provide Heat or Ins OF �0-01 MA rZOMMM _zzzM led TOP VIEW. Access Door 311 min. when Valve is fully open ............. J/ Shutof f Valves (2 req.) 7-7 311 min. 1211min. Drain .................. Support SIDE VIEW Figure 2-9: Minimum Clearances For RPBA Installation. (2-8) vves Of Backflo reventi I on Assemi3lies The daylight drain f rom 8. Because of the inherent design of a reduced a daylight drain. pressure backflow assembly, fluctuating supply above grade or semi-bu I ried vault must! pressure on an extremely�low flow or static * Be able to be bore sighted. flow condition may cause nuisance dripping Be installed above the ground or and potential fouling . of the assembly. in a * maximum flood level, whichever is static condition (i. e. an RPBA on the make-up reduced water line to a boiler), the zone of higher. pressure between the.check valves must be Be able to reasonably handle the volume� maintained at a 2.0 psi or greater differential of water that potentially could be below the incoming supply pressure. discharged from the relief valve port Depending on the degree of fluctuating Supply (see chart in Figure 2-8). > pressure, the assembly may discharge water In all cases$ whenever access to a from time to time. This nuisance discharge valve. vault is requiredo foil ow and comply can potentially foul the first check the installation 'state and local safety While not effective in all cases, with requiremen ts regarding Confined of a soft seated check valve immediately space entry (see Section 5). ahead of the RPBA will often hold the pressure constant to the assembly in times of fluctuating 4. An RPBA shall only be installed in a horizontal supply pressure. configuration. Any other orientation may deter hydraulically to avoid the RPBA from preventing backflow. 9. Size the assembly I excessive pressure loss. The head loss is not 5. Be careful to insure " that the assembly is not necessarily, proportional to flow. Some installed where the temperature and pressure assemblies have a high head loss at low flows is maintained above the a ssembly's rated and and IoW head loss at high flows. labeled capacities. . 10. In areas where debris content in the water. 6. Thermal water expansion and/or wat er supply, is high, good plumbing practice hammer downstream of the assembly can recommends a strainer with blowout tapping cause excessive pressure. To avoid possible ahead of the assembly. damage to the system and assembly from this 21/2: inches and larger shall have situation, use water hammer arresters or, 11. Assemblies blocks to prevent flange damage. surge protectors. support Consult the specific manufacturer for the 7. When the RBPA is located inside a building, it recommended location of Supports. shall be installed in a location where both the flush the lines before occasional spitting from the relief valve port, 12. Thoroughly the assembly. Years of and the possible constant discharge during a installing "failure fouled check situation, will not be experience have shown that Most to objectionable. it must be emphasized that a test satisfactory" results in new installations which will reasonably handle are caused by debris fouling one of the check drainage system the volume of water that could potentially be valves or the relief valve. discharged from the relief valve must be provided, in the installation. The chart in Figure 2-8 shows estimated relief valve discharge rates. (2-9) 4�1 - 9,3 -Y t . 18 April 19, 1996 CITY OF EDMONDS 250 5TH AVENUE NORTH - EDMONDS, WA 98020 - (206) 771-0220 - FAX (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public Works * Planning * Parks and Recreation 9 Engineering William Tosky Port of Edmonds 336 Admiral Way Edmonds, WA 98020 Mr. Tosky: BARBARA FAHEY MAYOR 71 L 1E T r It has come to our attention that the Port has reduced the amount of.parking available for Anthony's Restaurant by temporarily storing boats in a parkmig area designated for Anthony's use on the east side of Admiral Way. Further review has revealed that some of the parking designated for Anthony's by permit in 1989 (ADB-126-89) to the north of the restaurant has been striped yellow for permit use, and day time marina use. Additionally, parking area designated for Anthony's use by the same permit to the south of the restaurant has been restriped for trailer use. The Edmonds Community Development Code required Anthony's Restaurant, to provide 20 parking stalls for the first 4000 square feet of gross " floor area plus I stall per 100 square feet of gross floor area greater than 4000 square feet. This parking must be provided within 300 feet of the restaurant. In 1989 when permits were processed for the expansion of Anthony's Restaurant the Port showed how the parking requirement was met. With the temporary boat storage, yellow striping of Anthony's parking stalls, installation of trailer parking, addition of new boat storage facilities, and new office buildings, the City has no evidence that the existing or proposed uses will meet the minimum parking requirements'. Therefore, the Port must provide the City with a Port wide parking plan, indicating how parking. requirements are met for the existing uses and the proposed uses on Port property. Since the new office buildings and the boat storage facilities affect parking, permits will not be issued for either of these proposals until the parking issue is resolved. Please submit the required parking information to both Sharon Nolan, Building Permit Coordinator, and me, John Bissell, Associate Planner. It may be helpful for both you and the City Staff if we schedule a meeting with you, your consultants and City Staff to discuss exactly what you need to do to comply with City requirements. You 'may contact me at 771-0220. Sincerely, John Bissell, AICP Associate Planner C. Sharon Nolan, Permit Coordinator Jeffrey S. Wilson, Planning,Supervisor Robert Chave, Planning Manager Paul Mar, Community Services Director Tom Rosling, PND 0 Incorporated August 11, 1890 0 Sister Cities International — He�kinan, Japan 77� N,. 16 M V, 0" It V i -5, 4 STFt ILE EET F ndii I Ed= city Q� Comm unity Services Date: Received of: J "j j(b -5 ------- $ Cash-' Check ------- Water Meter Water Connection Sewer Perm e Tn ink Charge Sewer Connection wa e Dump Permit FdW Invasion (620 fund) Depo� reet Restoration S )et Use Permit tr( uilding Permit Ispection Ian Check/Plat r S s & Plans Deposit 7oning Applications ihorellne Permits S.E.P.A. Revibw Recording Fee Photostating Sales Tax Other X. "J Time: Hearing V Date of H 4 By. 1. I.V p� J .4, "V 1:`­ V 'A 't. V.� .,4 NJ�D 'i V �39006,�.. ADB-15-79 FILE # FOI;4%1 FOR DIMPUZATION OF [SIGX.Ifit*WNONSIGNIF.ICAI\ICE] Description of proposal Addition of boat storage rack -Proponent Boat. Loft, I nc. 465 Admiral Way Location of Proposa Lead Agency C i ty. of Edmonds This pToposal has bccn dcte i ot have] a sianificant ad- rin-ned to �Wzjz/n ETS verse inilwict upon -the envirormicnt. An. [�klis not] required under 10-143. 1 21C. 030'2) (6) . 1his decision was ruade af ter revieiq by f-he lead- L P ac,0111-Y OA. a conq)-leted. eiwiromicn.tal checlaist and other information on file with the lead agency. Dan Smith Responsible Official Position/Title Planninq Division Technician Date Tebruar' 1, 1979 Sig -nature y Y 0 F E D'll 0 N D PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION PUBLIC WORKS ENVIRONMENTAL REVIEW NAME: �i L-45-ff� �L-t- 4�C- . - FIL E # -/9uJ"6L') LOCATION: SUBDIVISION D PLAT E:l P..R.D. D MULTIPLE �9`t0llMERCIAL AN ENVIRONMENTAL REVIEW OF THE PROPOSAL HAS BEEN COMPLETED AND THE FOLLOWING DETERMINATIONS HAVE BEEN MADE: mrL ow.,:�MV41-Lm --- - 0 MUM - DATE: I CITY OF &ONDS PROJE4 Larp� A 79006..S '%AME��oAT C, ENVIRONMENT4LWSESSMENT DATE ITTED The information on this form will be used to determine the effect of your action upon the environment of the City of Edmonds. Please answer each question as thoroughly as possible. 1. LAND Area ��b 11� /0!9 So i 1 s Type SA,-wo�Z Limitations Description of topography (% slope) Nr NOTE: If grading or filling wil 1 Grading: Estimated cubic yards -Z-C.> >L&op S exceed 500 cubic yards a grading and filling plan must be sub - Filling: Estimated cubic yards mitted with the application. Estimated area to be paved (including buildings) &�o X 14CD Estimated area in open space (pervious surface) 4S' X 400' 2. WATER Stream - Estimated flow (cubic feet per second) Will stream be altered? If yes',.to what degree? Other water bodies? Impact on storm drainage Method of handling runoff Adjacent to shorelines zone? Within 200 feet of MHHW? wo 3. VEGETATION Type and approximate number of trees 9__ Minimum diameter of trees to remain % of trees to be removed Ground cover % to be removed Proposed landscaping, if any 4. EXISTING LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT: Single Multi Vacant Family Family Commercial Other North South X East West 5. CIRCULATION Estimated -increase in auto trips daily Availability of public transportation 6.. AREA OF IMPACT Neighborhood City-wide Regional 7. EFFECT'ON AIR QUALITY 8. CHANGES IN NOISE GENERATION (11/78) ENVIR014MENTAL ASSESSMENT DESCRIPTION OF PROPOS FILE # W,013 - A/I` 061�e. Q PROPONENT: -5&a;jI EXISTING USE: ENVIRONIMENTAL IMPACTS FROM PROPOSAL: 790066 SOILS/TOPOGRAPHY 7-1 ^.,eA, a-e-I 1 11 141 11 110 1 ffelf0a WATER/DRAINAGE AI.R QUALITY L 06� 4t,C -rL47n 00, CIRCULATION "'44 4AOO� A`7 5� lie, AA4-1r1eIIW fp-- rz4-#r Vfk trI40. GE TI �, V, ECONOMI C CITY SERVICES ENVIRONMENTAL FINDINGS: There will be certain environmental impacts but they do not constit ute a signif- fcant adverse impact on the environment and no environmental -impact statement will be required. There will be significant adverse -impacts on the environment and an environmental impact statement will be required. There will be certain impacts on the environment however it is necessary to obtain more information before a declaration of significance or non -significance is made. CITY PLANNER YATE 79006::) ENVIRONMENTAL CHECKLIST Introduction: The State Environmental Policy.Act.of 1971,.Ch�ipter 43.21C, RCW�,, requires'all state and local governmental agencies to consider environmental,values bath.fortheir own actions and when licensing private proposals. The Act also requires that.an.Environmental Impact Statement.(EIS) be prepared for all major actions. significantly.affecting the -quality of the environment. The purpose of this checklist is to help the agencies involved determine whether or'not a proposal i's such'a major action. Pleasie answer the following questions as completely.as you can with the information available.to you Where explanations of your answers are required, or where you.. believe an exp.lanation.woul,d be helpful:to government decision makers, include your explanation in the space provided, or use additional pages. You should include references to -.any reports or studies of which you are aware,and which are relevant to the answers you.provide.. Complete answers, to thosequestions now will help all agencies involved undertake the required.environmental review without unnecessary -delay. Thefollowing questions apply to your total proposal, not just to the, permit for.which,you are currently applying or the proposal for which a ught pproval:is so Your answers should include the impacts,that.will be, caused by your proposal when,it is.completed, even:, though completion maynot occur until sometime in the future. This will.allow all agencies involved to complete duplicating their environmental review now, wi paperwork in the future. NOTE: This is a standard form being,used by�all state.,. and local agencies,intheState of Washington for various types of.proposals. Many of the questions may not apply to your proposal. If a question does not apply, just answer it "not applicable" (N/A) and continue on to the next question. 1. Name of Proponent .2. Address.and Phone�Number of Proponent 7_,LA4�,� L-JA ,3. Date Checklist Submitted--U 4. Agency Requiring Checklist 5.. Name of Proposal, if applicable. 6.., Nature and Brief Description of- P'rop.Qsal. (inclu.ding but not limited to its size,,general design elements, a*n"d other factors that will give an accurate understanding of its scope and nature: 7. Location of Proposal (describe the physical.setting of.the prop*osal,..as well,as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate -under- standing of the environmental setting of -the proposal): 8. Estimated Date for Completion of the Proposal 'Y*1APc%..c_t4 1 1,1-717 9. List of all Permits, Licenses, or Government Approvals Required for all Proposal (federal,.state, and local —.including rezones): 10. Do you have any plans for future additions, expansions, or further activity. related to or connected with this proposal? If -yes, explain. 11. Do you know of any plans by others which may affect the property covered by yourproposal? If yes, explain. 12. Attach any other application form that has been completed -regarding the proposal; if none has been completed, but is expected -to be filed at some future date, describe.the nature of such appli.cation..form: -I- ENVIRNMENTAL IMPACTS (Explanations of,all "yes"'and "maybe" answers,are required). YES MAYBE NO 1. Earth. Will the proposal result- in: a Unstable earth condit : ions or in changes in geologic substructures? b. Disruptions,, displacements, compaction, or overcover.ing of the.soil? c.� Change in topography or ground surface rel.ief features? d . The destruction, covering or modifica-, ti.on of any unique geologic or physical features? e. Any increase in wind or water erosion of:soils, either on or off the site? f. Changes indeposition or erosion of beach sands, or changes in siltation,. deposition or erosion which may modify the channel, or a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: 2. Air. Will the proposal.resul:t in: a. Air�emissions or deterioration of ambient ai.r.quality? b. The creation of objectionable odors? f, a*r movement, moisture c. Alteration o 1 ortemperature, or any change in climate, either'locally or regionally? Explanation: 3. Water. Will.the,proposal result in: a. Changes in currents, or the course or direction of water movements, in either marine or fresh waters? b. Changes in absorption rates, drainage. patterns, or therate and amount of sur- face water runoff? T t..� MTUt NU c.. Alterations to the course or flow, of flood waters? d. Change in the amount of surface Water, in any water body? e. Discharge in.to.surface-waters, or�in any -alteration of surface water quality, including but not limited to temperature, dissolved oxygen or.,turbi,dity? f. Alteration of�the direction Or rate ..of- flow. of, ground waters?. g�. - Change inthe quantity of ground waters,...either through direct additions or withdrawals, or through interception of an aquifer by cuts or.excavations? h. Deterioration in ground water quality, either through'direct injection, or through the seepage of leachate, phosphates, deter-. gents, waterb ' orne virus or bacteria, or other substances into the ground -waters? i. Reduction in the amount of water otherwise available for public water supplies? Explanation: 4. Flora. Will the proposal result in: a. Change in the,diversity of species or numbers of any species of flora (in- cluding trees, shrubs, grass, crops, aquatic,pl.ants)? Reduction of the numbers of any unique, -rare or endangered species of flora? c.. Introduction of new species of flora into an area, or in a barrier to.the normal replenishment of exist- ing species? d. Recut ion in acreage o,f any agri- cultural crop? Explanation: -3- YE& MAYBE NO, 5. Fauna.' WIll the proposal, result in: a. Changes in the diversity. of species, or numbers of any species of' fauna (birds, land anima1s tncluding 're -ptiles, fish..and shellfish, benthic organisms', insects -or., micrdfauna)? b. Reduction of the .numbers% of any unique, rare or,endangered species of fauna? _Y7 c. Introduc.tion.of new species of fauna into an area, or.result in a barrier to..the migration or movement of -fauna? d. Deterioration to existing fish or wildlife habitat? Explanation: 6. Noise.� Will the proposal increase. existing noise levels? Explanation: 7. Light.and Glare. Will the proposal. produce new li�ht or glare? Explanation: 8. Land Use. Will the propos*al result in.the alteration of planned land use of the present Pr an area? Explanation: 9. Natural Resources.. Will'.the proposal result in: ..a. Increase in the rate of Use of any natural, resource? b. Depletion of any nonrenewable natural resource? Explanation: -4- 11. Population. Will the proposal alter the -location, distribution, density, or growth rate of -the --human ? population of an area. Explanation: 12. Housing. Will the proposal affect existing housing, or create a demand.for-additional housing? Explanation: 13. Transportation/Circulation. Will the pro- posalresult in: a.. Generation of additional vehi-cular movement?. b. Effects on existing.parking facili- ties,.or demand for.new parking? c. Impact upon. existing transportation �systems? ,d. Alterati.ons to present patterns of circulation or movement of people and/or .goods? e. Alterations to waterborne, rail or air traffic? f. Increase -in traffic hazards to motor vehicles, bicyclists or pedestrians? Expl anati on:— !�k Cy- -50. ..an effect.upon,. or. resultAn a -need for new or altered�governmental services in any of the following areas: ..a. Fire protection? b. Police protection'? c Schools? d. Parks or other recreational facilities? e Maintenance of public fa c i 1 it4e s including roads? f. Other governmental services? _XI Explanation: 15. Energy. Will.the proposal result in: a. Use of substantial amounts of'fuel or energy? b. Demand upon existing sources of energy, or require the development of new sources of pnergy? Explanation: 16. Utilities. Will the proposal result in .a need for new systems or -alterations to thejollowing utilities: a. Poweror natural gas? b. Communications systems? c. Water? d. Sewer or septic tanks? e. Storm water drainage? f. Solid waste and disposal?, Explanation: M-11 19.. Recreation. Will the proposal result in an impact upon the.qUality or quan- tity of existing recreational oppor- tunities? Explanation: Pit q V 0_e,!-� 004P to 1 0 W PrA.- Al�e_ T=iO(L— a0A-T- t'S, vV KtAa-jZ_S 20. Archeological/Historical. Will the proposal.result in an alteration of a.significant archeological or his- torical site, structure object.or building? Explanation: C. SIGNATURE I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood.that the.lead agency.may withdraw any declaration or non -significance that it might issue in reliance upon this checklist should there be any willful, misrepresentation or willful lack of fu,11 qisclosure on my part'.. PROPONENT: -7- TO Harry Whitcutt. BuildfAL\ Official Cl-W OF EDMONDS 250 - 5th North EDMONDS, WASHINGTON 98020 E] POLICE DEPT. FIRE DEPT. SUBJECT REPLY REQ I DATE . No Boat Loft, Inc. YES' Oct.16,1974 P-1 ril I Per -our conversation this date, this is to confirm that the Boat Loft was given approval to delete the standpipe system previously required. Final fire protection �to date for the structures existing on the premises consists of -ift two (2) dry chemical extinguishers. The extinguishers are 150 pound dry chemical, wheeled type, located as follows: ,.one unit at the -south end,, east side. U) one unit located mid -point, east side. -Additional structures will require re-assesment of the protection needs. -4 PLEASE I SIGNED REPLYTO-s. e Mar al SIGNED FORM NO. MEM. 88T SEND PARTS 1 AND 3 WITH CARBON INTACT. PART 1 IS RETURNED WITH REPLY :F �Ju File No. AM Date CITY OF EDMONDS PLANNING DEPARTMIENT CIVIC CENTER ANNEX, EDMONDS, WASHINGTON'- 98020 APPLICATION FOR APPROVAL BY AMENITTES DESIGN BOARD I, (We) the undersigned,. hereby make ?pplication to the City of Edmonds for Amenities Design Board approval (or modification of a previous approval) of the accompanying plans for (nature of use): which plans are attacheU hereto and made a part hereof in accordance with the provisions of Ordinance The. following. are pertinent facts vjith respect to the proposed development: 1. Name and address of applicant(s): 2 E c4and�s i 141A qggpghone: 77Y-,65'16' 2. Applicant's interest in property: owner agent.for owner( architect ( ) optionor ( ) 'other ( 3. Name and address of owner(s) P. - L Irk- .C�ff died Weld Phone: 4. Location of property: Street Nuribcr: 056- o4djwol Ali ---FcXw)x-,1s %J or Common Address: 5. This property is presently zoned:, 14 6. Use for which approval is requested is specifically described as fol I ows: 7., Existing use of property: C-4 :5 h, e-r- 8. If approved, work on project will begin about: 7 //0 L-7,5- 9. Estimated tirne for completion of work;-,,2 I Ze e 1�� 10. Date: 11. Attatcliments Number I (We) hereby certify to the best of my' (our) kno'l'q edge, that the sLaLements and information contained herein are all respects true and correct. Signature �f Applica�,T­ 71,11mv 41M Sc>o,-T- C-1 Z u t-clol: 'o A-T- rc) BE Loe-ATev ---------- 91 r A 'AousF- A Ct mmejL6kt. A I _a I b%-OG, I 5101 740 j 310 FLOT FF'�- N 0 Wmi am Emma E-E Goa 00 — CF) 2 0 z z 0 LU 0 CC ,*6S A �s CA M (.-I -vo--6 % WQI,;zl IISC7 1 --l- - or To"Cj,wc� -40 AM t IN ICAT LOFT INCIII 465 ADMIRAL WAY EDMONDS, WASHINGTON 98020 774 - 6515 (y) OD in A V January 10, 1984 MEMO TO: Hal Reeves Building Official FROM: Gary L. McComas Fire Marshal 1?w LO1- SUBJECT: NEW OFFICE BUILDING AT 465 ADMIRAL WAY After review by the fire department, the only requirement is for one fire extinguisher as indicated - minmum size is 2,A-10,B:C dry chemical type. GLM: be OU I LD I NG ENVELOPE NE14T LOSS BUDGET CALCULATIDN fOR" JOB: BUDGET (PER ENERGY CODE) BUILDING GROSS SQ. FT. ASSEMBLY U VALUE AREA (SQ. FT.) U x A WALL CE I L I NG/ROOF FLOOR F VALUE LENGTH IFT.) F x L ISLAB PERIMETER* 7,2- BUDGET TOTAL PROPOSED DESIGN ASSEMBLY U VALUE AREA (SO. FT.) U x A I ILI kVAu- XZ2A F VALUE LENGTH (FT.) F x L SLAB PERIMETER* 72-- 3q d PROPOSED TOTAL i 2- To most the Code, the Proposed Total must be no greater than the Budget Total. *Optional If permitted by Building Official BW-3 ENVELOPE C014POKENT U VALUE CALCULATION FORK Sketch Building Section here: V Ai f#, AT VAL-J, BETWEEN FRAMING AT FRAMING Element R Value E I ement R Value inside Air Film 0 &b inside Air Film &P� 19:4 ]�� L1, 0. -g- x - . Mw7sL— Outside Air Film Outside Air Film 17 O'S 2,71 Framing Percentage Insulated fraction Framed fraction avg. Insulated R valu 0 Framed R value 271 uevg. BW-2 ENVELOPE COMPONENT U VALUE CALCULATION FORM Sketch Building Section here: CV BETWEEN FRAMING Element R Value inside Air Film Outside Air Film 1`7 10-135" Framing Percentage .1-2, U insulated traction Framed fraction avg. Insulated R value Framed R value Uavg. 0 4 0466 /kr AT FRAMING Element R Value Inside Air Film OVER FR�Iml, 29a Outside Air Film 1*7 17. 4�2- t 17-42- i BW-2 F ej3 14 �984 336 ADMIRAL WAY * P.O. BOX 398 EDMONDS, WASHINGTON 98020 e (206) 774-0549 February 10, 1984 Mr. Hal Reeves Building Inspector City of Edmonds Building Department Edmonds, WA 98020 Dear Mr. Reeves: I am writing regarding the application for a building permit by Boat Loft, Inc. The Port of Edmonds operates several public rest rooms in our various facilities. We have no objection at this time to the Boat Loft personnel or their customers using these restrooms as they have done in the past. Sincerely, William E. Auerswald PORT MANAGER WEA/pt Serving all of Western Washington 0 TOWN & COUN Y STEEL BUILDINGS of Western Washington, Inc. P. 0. Box 2040, Lynnwood, Washington 98036 Offices Located at 16521 Highway 99 Telephone (206) 743-1555 February 149 1984 Inspector Hal-�Reeves City of Edmonds Building Dept* Edmonds, Washington 98020 Mr, Reevesp ADDENDA NO, 1 THE, BOAT LOFT PROJECT Washington General Contractors License Number 233-01 TO-WN-CS-B261R3 Division 15 Add to specifications an electric forced air wall mount hegter of capacity to heat building to minimum 70 . Division 7 Delete 11" vinyl face batt insulation, replace 2 with 311 thick R-10 same material. Add R-11 fiberglass kraft or foil back 241'',-( wide insulation to all walls. Respectfully Submitted, R ert A, �Shepp cc Bill Karr Desi,-n-Manager. STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS _4165- A�W49�01 LOCATION OF DEVICE zlCldnot,�_ ;o�e DEVICE: Manufacturer Model Size Serial,No. LINE PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 11 1. LEAKED El 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT REDUCED PRESS URE 2. DID NOT OPEN CLEANED 0 'CLEANED 0 CLEANED 'K REPLACED: �REPLACED: REPLACED: DISC ------------- 0 DISC ------------- r_1 DISC.UPPER ---------------------- R SPRING ----------- El SPRING ----------- 0 DISC.LOWER ---------------------- El E GUIDE ------------ El GUIDE ------------ El SPRING -------------------------- 0 P PIN RETAINER ----- El PIN RETAINER ----- El DIAPHRAGM, LARGE A HINGE PIN -------- 11 HINGE PIN -------- 0 UPPER ------------------------- El I SEAT -------------- El SEAT ------------- El LOWER ------------------------- El R DIAPHRAGM -------- El DIAPHRAGM ------- El DIAPHRAGM, SMALL S OTHER, DESCRIBE.-- El OTHER, DESCRIBE UPPER ------------------------- E3 LOWER --------------- SPACER, LOWER , OTHER, DESCRIBE FTNAL OPENED AT LBS. TEST CLOSED TIGHT ----- [I CLOSED TIGHT ----- 0 REDRED PRESSUFE REMARKS: c2/,w_sZe./ 7-0AZZ THE ABOVE REPORT IS CERTIFIED TO BE TRUE: DATE 6A_1�7.9 INITIAL TEST PERFORMED BY OF REPAIRED BY DATE FINAL TEST PERFORMED BY OF DATE STREET FILre CITY OF EDMONDS PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS ew 5; LOCATION OF DEVICE 1�1_dVoOPI DEVICE: 0 Manufacturer Model Size Serial No. LINE -PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED El 1. LEAKED El 1. OPENED AT Z.2— _LBS. TEST, 2. CLOSED TIGHT )K 2. CLOSED TIGHT X REDUCED PRESSURE 2. DID NOT OPEN E3 CLEANED EJ CLEANED 0 CLEANED REPLACED: REPLACED: REPLACED: DISC ------------- 11 �DISC ------------- 11 DISC.UPPER ---------------------- R SPRING ----------- 0 SPRING ----------- 0 DISC.LOWER ----------------------- E GUIDE ------------ 0 GUIDE ------------ 0 SPRING -------------------------- E-1 P PIN RETAINER ----- 0 PIN RETAINER ----- El DIAPHRAGM, LARGE A HINGE PIN --------- 0 HINGE PIN -------- El UPPER ------------------------- I SEAT ------------- 11 SEAT ------------- El LOWER ------------------------- EJ R DIAPHRAGM -------- El DIAPHRAGM— ------- El DIAPHRAGM, SMALL S OTHER, DESCRIBE 0 OTHER, DESCRIBE --E] UPPER ------------------------- 0 -1 i LOWER --------------- E SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- 0 CLOSED TIGHT ----- 0 REDUCED PRESSU REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY ee-901 OF Ire DATE !�31179 47/ REPAIRED.BY DATE FINAL TEST PERFORMED BY OF .—DATE STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLIW DEVICE TEST REPIRT NAME OF PREMISES SERVICE ADDRESS LOCATION OF DEVICE DEVICE: Manufacturer Model �ize Serial No. LINE PRESSURE AT TIME OF TEST /3,57 LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE -LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF'VALVE INITIAL 1. LEAKED 0 .1. LEAKED 0 1. OPENED AT LBS. TEST 2. CLOSED TIGHT E 2. CLOSED TIGHT 19 . . REDUCED PRESSUFE 2. DID NOT OPEN CLEANED EJ CLEANED 0 CLEANED REPLACED: REPLACED: . REPLACED: DISC ------------- El DISC ------------- C3 DISC.UPPER ---------------------- 0 R SPRING ----------- 0 SPRING ----------- 0 DISC.LOWER ---------------------- 1:1 E GUIDE ------------ 0 GUIDE ------------ 0 SPRING ---------------------------- 0 P PIN RETAI-NER ----- 0 PIN RETAINER ----- 0, DIAPHRAGM, LARGE A HINGE PIN -------- I] HINGE PIN -------- El UPPER ------------------------- .0 I SEAT ------------- 0 SEAT ------------- 11 LOWER ------------------------- 0 R DIAPHRAGM -------- El DIAPHRAGM— ------- El DIAPHRAGM, SMALL s OTHER, DESCRIBE 0 OTHER, DESCRIBE 0 UPPER ------------------------- 0 LOWER --------------- 11 SPACER, LOWER OTHER, DESCRIBE .FINAL OPENED AT LBS. TEST CLOSED TIGHT----7- 0- CLOSED T-IGHT ----- 0. REDUCED PRESSURE REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY AOe,qwr.11 cc-qew OF c<, DATE 51-311;W REPAIRED BY DATE FINAL TEST PERFORMED BY OF DATE_ STREET FILE* CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS ­7 -A LOCATION OF DEVICE /-AZINLIP-4 0 . J_ 1 DEVICE: WAZiDP Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED E) 1. LEAKED El 1. OPENED AT 2_,_3 LBS. TEST 2. CLOSED TIGHT L CLOSED TIGHT I REDUCED PRESSURE 2. DID NOT OPEN CLEANED 0 CLEANED El CLEANED REPLACED: REPLACED: REPLACED: DISC ------------- El DISC ------------- 11 DISC.UPPER ----------------------- El R SPRING ----------- El SPRING ----------- El DISC.LOWER ---------------------- El E GUIDE ------------ El GUIDE ------------ El SPRING --------------------------- 0 P RETAINER ----- El PIN RETAINER ----- El DIAPHRAGM, LARGE A HINGE PIN ----- r-- El HINGE PIN -------- 1:1 UPPER ------------------------- 13 I SEAT ------------- El SEAT ------------- 0 LOWER ------------------------- - El R DIAPHRAGM -------- D DIAPHRAGM-; El DIAPHRAGM, SMALL s OTHER, DESCRIBE El OTHER, DESCRIBE 0 UPPER ------- ; -------------------- 0 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- 11 CLOSED TIGHT ----- 0 REDUCED PRESSU REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY CC 0)0/ 0 F -,,v -DATE S/3f/78 REPAIRED BY DATE FINAL TEST PERFORMED -BY OF DATE STREET FILE CI*TY OF E.DMONDS -- PUBLIC WORKS DEPARTMENT BACKFLO W DEVICE TEST REPORT NAME OF*PREMISES SERVICE ADDRESS 414,57 LOCATION OF DEVICE 1251cW DEVICE:. ktl)oc� '��o 0 / Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST G LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. I CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 1--] 1 . LEAKED El 1. OPENED AT Z,2 LBS. TEST 2. CLOSED'TIGHT E 2*. CLOSED TIGHT 0 REDUCED PRESSUFE 2. DID NOT OPEN CLEANED EJ CLEANED El CLEANED REPLACED: REPLACED:, REPLACED: DISC ------------- El DISC ------------- 0 DISC.UPPER ----------------------- R SPRING ----------- El SPRING ----------- E) DISC. LOWER ---------------------- El E GUIDE ------------- 0 GUIDE ------------ 0 SPRING -------------------------- 0 P PIN RETAINER ----- E3 PIN RETAINER E3 DIAPHRAGM, LARGE A HINGE PIN -------- El HINGE PIN -------- El UPPER ------------------------- 0 I SEAT -------------- El SEAT ------------- El LOWER ------- ------------------ EJ R DIAPHRAGM -------- El DIAPHRAGM El DIAPHRAGM, SMALL S OTHER, DESCRIBE 13 OTHER, DESCRIBE --E] UPPER ------------------------- LOWER --------------- SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- El CLOSED TIGHT ----- 11 REDUCED PRESSURE REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY 40, 0 F D A T E REPAIRED BY ty DATE FINAL TEST PERFORMED BY OF DATE STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT -NAME OF PREMISES SERVICE ADDRESS LOCATION OF DEVICE DEVICE:- 9 C)00 Manufacturer Model Size. �erial No. LINE PRESSURE AT TIME OF TEST PRESSURE DROP ACROSS FIRST CHECK VALVE 6.3 "; I LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 0 1. LEAKED 1:1 1. OPENED AT _L B S . TEST 2. CLOSED TIGHT 2. CLOSED TIGHT 2r REDUCED PRESSURE 2. DID NOT OPEN CLEANED 0 CLEANED El CLEANED REPLACED: REPLACED: REPLACED: DISC ------------- 11 DISC ------------- 0 DISC.UPPER ---------------------- El R SPRING ----------- 0 SPRING ----------- El DISC.LOWER ---------------------- EJ E GUIDE ------------ I] GUIDE ------------ El SPRING -------------------------- El p PIN RETAINER ----- El PIN RETAINER ----- 0 DIAPHRAGM, LARGE A HINGE PIN -------- 13 HINGE PIN -------- 13 UPPER ------------------------- 0 I SEAT ------------- El SEAT -------------- El LOWER ------------------------- 0 R DIAPHRAGM -------- El DIAPHRAGM— ------- 11 DIAPHRAGM, SMALL s OTHER, DESCRIBE 0 OTHER, DESCRIBE 0 UPPER ------------------------- 0 LOWER ----- --------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT, LBS. TEST CLOSED TIGHT* ---- 13 CLOSED TIGHT ----- 0 REDUCED PRESSURE REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: .I'NITIAL TEST PERFORMED BY, e-e-_111 OF EZ, DATE' 57- REPA1RE D BY ---DATE FINAL TEST'P'ERFORMED BY OF DATE STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE,TEST REPO.RT NAME OF PREMISES SERVICE ADDRESS LOCATION OF DEVICE 4 /-,, 0. le DEVICE: - Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST 113s- PRESSURE DROP ACROSS FIRST CHECK VALVE N-m LBS. LBS. CHECK VALVE NO. I CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 0. 1. LEAKED 0 1. OPENED AT -3 7— LBS. TEST 2. CLOSED TIGHT 19 2. CLOSED TIGHT 9 REDUCED PRESSURE 2. DID NOT OPEN 0 CLEANED 0 CLEANED 0 CLEANED 0 REPLACED: REPLACED: REPLACED: DISC ------------- 0 DISC ------------- 0 DISC.UPPER ---------------------- 0 R SPRING ----------- 0 SPRING ----------- EJ D I SC. LOWER ---------------------- El E GUIDE ------------ El rUIDE ------------ El SPRING --------------------- 7 ---- Ej P PIN RETAINER ----- El PIN RETAINER ----- El DIAPHRAGM, LARGE A HINGE PIN -------- ED HINGE PIN -------- 0 UPPER ------------------------- LJ I SEAT ------------- El SEAT ------------- El LOWER ------------------------- El R DIAPHRAGM -------- El DIAPHRAGM -------- El DIAPHRAGM, SMALL s OTHER, DESCRIBE 0 OTHER, DESCRIBE --E:l UPPER ------------------------- 0 LOWER --------------- 13 SPACER, LOWER OTHER,.DESCRIBE FINAL* OPENED AT LBS.' TEST CLOSED TIGHT ----- El CLOSED TIGHT ----- 11 REDUCED PRESSURE REMARKS: THE ABOVE REPORT IS CERTIFIED T 0 BE TRUE: INITIAL TEST PERFORMED BY wis Cf- - �3 11 OF C _DATE. �5)31/79 REPAIRED BY ILK.K. DATE FINAL TEST PERFORMED BY OF DATE STREET FILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES )�� W SERVICE ADDRESS LOCATION OF DEVICE DEVICE: vVz-70 97 Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE 7Z LBS. CHECK VALVE NO. CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED El 1 . LEAKED 0 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT REDUCED PRESSURE 2. DID NOT OPEN CLEANED 11 CLEANED El CLEANED REPLACED: REPLACED: REPLACED: DISC -------------- 0 DISC ------------- I] DISC.UPPER ----------------- 7 D R SPRING ----------- El SPRING ----------- El DISC.LOWER ---------------------- 0 E GUIDE -------- �­- El GUIDE ------------ I El SPRI . NG ---------------- ---- C-3 p PIN RETAINER ----- Ell PIN RETAINER ----- 0 DIAPHRAGM, LARGE A HINGE PIN ------ ­ EJ HINGE PIN --------- El UPPER ------------ 7 ------------- El I SEAT ------------- C1 SEAT ------------- El LOWER ------------------------- El R DIAPHRAGM -------- El DIAPHRAGM El DIAPHRAGM, SMALL S OTHER, DESCRIBE C1 OTHER, DESCRIBE --E] UPPER ------------------------- 0 LOWER --------------- El SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- [I CLOSED TIGHT ----- 0 REDUCED PRESSURE REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY _w/s IM17 0 F C� 74, el, DATE 5—/3P//-7 REPAIR ED BY -DATE FINAL TEST PERFORMED BY OF DATE E 0 STREET FILE CITY IF EIMINIS -- PUBLIC WORKS -DEPARTMENT ACKFLIW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS LOCATION OF DEVICE DEVICE:- 6) Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST LBS. . PRESSURE DROP ACROSS FIRST CHECK VALVE 1b .7 LBS. CHECK VALVE NO. I CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 1. LEAKED 0 1 . OPENED AT _LBS. TEST 2. CLOSED TIGHT EJ 2. CLOSED TIGHT REDUCED PRESSURE 2. DID NOT OPEN CLEANED 0 CLEANED CLEANED El REPLACED: REPLACED: REPLACED: DISC ------------- El DISC ------------- 0 DISC.UPPER ---------------------- R SPRING ----------- E] SPRING ----------- 0 DISC.LOWER ---------------------- EJ E GUIDE - ___1 ------ El GUIDE ------------ 11 SPRING -------------------------- P PIN RETAINER ----- El PIN RETAINER ----- 11 DIAPHRAGM, LARGE A HINGE PIN -------- 0 HINGE PIN -------- El UPPER ------------------------- EJ I. SEAT ------------- El SEAT ------------- El LOWER ------------------------- R DIAPHRAGM -------- El DIAPHRAGM-; 0 DIAPHRAGM, SMALL S OTHER, DESCRIBE El OTHER, DESCRIBE El UPPER ------------------------- 0 LOWER --------------- E] SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- C3 CLOSED TIGHT ----- REDUCED PRESSU REMARKS: ":�fxe�.C":ao w-'.1 C'/CZCj'- THE ABOVE REPORT IS CERTIFIED TO BE -TRUE: INITIAL TEST PERFORMED BY e-e-901 OF W'a� --DATE 6--SI-9A REPAIRED BY .&>,e_ g5gKt, e'%' L, A- 9/ j e ge � � � . v DATE FINAL TEST PERFORMED Bi AF 0 F L---,/ jv d DATE e � . STREET FILE* CITY OF EDMONDS —PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS ��W/ iwl 461A LOCATION OF DEVICE DEVICE:� zt;4& Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST PRESSURE DROP ACROSS FIRST CHECK VALVE LBS.- 4�� , !�;— LBS. CHECK VALVE NO. I CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED El 1 . LEAKED 0 1 - OPENED AT 9 LBS. TEST 2. CLOSED TIGHT -14 2. CLOSED.TIGHT - REDUCED PRESSURE 2. DID NOT OPEN CLEANED 0 CLEANED El CLEANED REPLACED: REPLACED: REPLACED: .DISC ------------- El DISC ------------- 11 DISC.UPPER ---------------------- El R SPRING ----------- El SPRING ------------ 0 DISC.LOWER ---------------------- El E GUIDE ------------ 0 GUIDE ------------ (__1 SPRING --------------------------- P PIN RETAINER ----- El PIN RETAINER ----- El DIAPHRAGM, LARGE A HINGE PIN -------- El HINGE PIN -------- 0 UPPER -------------------------- I SEAT -------------- El SEAT ------------- 11 LOWER ------------------------- R DIAPHRAGM -------- El DIAPHRAGM — ------- 0 DIAPHRAGM, SMALL S OTHER,. DESCRIBE El OTHER, DESCRIBE --E] UPPER -------------------------- El LOWER --------------- F-1 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- El CLOSED TIGHT ------ 0 REDUCED PRESSURE R E M A R K S THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY 0 F DATE —!is REPAIRED BY XKX DATE FINAL TEST PERFORMED BY OF DATE STREETFILE CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS LOCATION OF DEVICE DEVICE: 60a,&O, Manufacturer Model Tize Serial No. LINE PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE A2 LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 0 1. LEAKED 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT 0 REDUCED PRESSURE 2. DID NOT OPEN 0 CLEANED C3 CLEANED CLEANED E3 REPLACED: REPLACED: REPLACED: DISC -------------- El DISC — ----------- 0 DISC.UPPER. ---------------------- El R SPRING ----------- El SPRING ----------- 0 DISC.LOWER ---- ----------------- E3 E GUIDE ------------ F-1 GUIDE ------------ 11 SPRING -------------------------- 0 p PIN RETAINER ----- 0 PIN RETAINER ----- C1 DIAPHRAGM, LARGE A HINGE PIN -------- El HINGE PIN -------- El UPPER ------------------------- 0 I SEAT ------------- El SEAT ------------- El LOWER ------------------------- 0 R DIAPHRAGM -------- 0 DIAPHRAGM- El DIAPHRAGM, SMALL S OTHER, DESCRIBE El OTHER, DESCRIBE --E] UPPER ------------------------- 0 LOWER --------------- .0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- C1 CLOSED TIGHT ----- REDUCED PRESSU REMARKS: THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY w/s ec-11? OF DATE REPAIRED BY JLK.K. A&Opw& DATE 4,./-79 FINAL TEST PERFORMED BY _DATE (. -2-76 r,t e- c- OF- STREET FILE 0 CITY OF EDMONDS —PUBLIC WORKS DEPARTMENT I BACKFLOW DEVICE TEST REPORT NAME OF PREMISES SERVICE ADDRESS "/(o s- wA01"401 LOCATI ON OF DEVICE C DEVICE:,' -el Manufacturer Model Size Serial No. LINE PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. I CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED El 1 . LEAKED El 1. OPENED AT LBS. TEST 2. CLOSED TIGHT )EL 2. CLOSED TIGHT REDUCED PRESSURE 2. DID NOT OPEN CLEANED El CLEANED El CLEANED REPLACED: REPLACED: REPLACED: DISC ------------- 0 DISC ------------- El DISC..UPPER ---------------------- 11 R SPRING ----------- El SPRING ----------- 11 DISC.LOWER ---------------------- 0 E GUIDE ---------- 7- E] GUIDE ------------ El SPRING --------------------------- 0 p PIN RETAINER ----- 13 PIN RETAINER ----- 11 DIAPHRAGM, LARGE A HINGE PIN -------- El HINGE PIN* -------- 11 UPPER ------------------------- 0 I SEAT ------------- El SEAT ------------- El LOWER ------------------------- El R DIAPHRAGM -------- El DIAPHRAGM — ------- 11 DIAPHRAGM, SMALL S OTHER, DESCRIBE 0 OTHER, DESCRIBE 0 UPPER -------------------------- C3 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHTL.---- El -CLOSED TIGHT ----- 0 REDUCED PRESSU REMARKS:- ZPA16— THE ABOVE REPORT IS.CERTIFIED TO BE TRUE: Vs CC -N 7 INITIAL TEST PERFORMED BY OF REPAIRED BY FINAL TEST PERFORMED BY OF. DATE !-e_13 DATE DATE 0 STREET FILE 0 CITY OF EDMONDS -- PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES Atl�- 10) 40-4ev's-Z SERVICE ADDRESS 1416E— LOCATION OF DEVICE DEVICE:. Manufacturer Model Size Serial No., LINE.PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE LBS. CHECK VALVE NO. 1 CHECX VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED El I . LEAKED 11 1. OPENED AT 29- LBS. TEST 2. CLOSED TIGHT E4 2. CLOSED TI . GHT REDUCED PRESSURE 2. DID NOT OPEN El CLEANED F-1 CLEANED 0 CL:EANED REPLACED: REPLACED: REPLACED: DISC ------------- 0 DISC ------------- 0 DISC.UPPER ---------------------- El R SPRING ----- I ------ 0 SPRING ----------- E3 DISC.LOWER ---------------------- El E GUIDE ------------ 0 GUIDE ------------ 0 SPRING --------------------------- I] p PIN RETAINER ----- El PIN RETAINER ----- 11 DIAPHRAGM, LARGE A. HINGE PIN -------- 1:1 HINGE PIN --7 - - - - - El UPPER ------------- 7 ----- ----- LJ SEAT ------------- 0 ---------- SEAT --- El LOWER -------------------------- 0 R DIAPHRAGM -------- El DIAPHRAGM 0 DIAPHRAGM, SMALL S OTHER, DESCRIBE C1 OTHER, DESCRIBE --13 UPPER ------------------------- .0 LOWER ----- 7 --------- ED SPACER, LOWER ..OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- C1 CLOSED TIGHT ----- 0 REDUCED PRESSURE REMARKS: TH E ABOVE REPORT.IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY wis REPAIRED BY -K.K.K. FINAL TEST PERFORMED BY OF DATE DATE OF DATE STREET FJLE 40 CITY OF EDMONDS —PUBLIC WORKS DEPARTMENT BACKFLOW DEVICE TEST REPORT NAME OF PREMISES �/ ZS47OM404 SERVICE ADDRESS LOCATION OF DEVICE DEVICE: Manufacturer Model -§ize Serial No. LINE PRESSURE AT TIME OF TEST LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE 2 -LBS. CHECK VALVE NO. I CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 0 1 . LEAKED 9 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 91 2. CLOSED TIGHT El REDUCED PRESSUVE 2. DID NOT OPEN CLEANED 0. CLEANED El CLEANED REPLACED: REPLACED: REPLACED: DISC ------------- 11 DISC ----- -------- El DISC.UPPER ---------------------- El R SPRING ----------- 0 SPRING ------------ E) DISC.LOWER -------------- 7 ------- 0 E GUIDE ------------ 0 GUIDE ------------ El SPRING -------------------------- EJ P PIN RETAINER ----- El PIN RETAINER ----- 11 DIAPHRAGM, LARGE A HINGE pitj -------- El HINGE PIN -------- 13 UPPER ------------------------- C3 I SEAT ------------- 11 SEAT ------------- El LOWER ----------- ; --------------- El R DIAPHRAGM -------- El DIAPHRAGM -; El DIAPHRAGM, SMALL s OTHER, DESCRIBE C3 OTHER, DESCRIBE --.0 UPPER -------------------------- 0 LOWER --------------- SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT TEST CLOSED TIGHT ----- X CLOSED TIGHT-----)� _LBS. REDUCED PRESSURE REMARKS: _/� 00. 'e-' THE ABOVE -REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY 'w/s 3 /7 OF C,&- DATE REPAIRED BY Lo' —,i1V,0A97- 04' DATE06 -/-78 FINAL TEST PERFORMED BY OF 077- DATE 6 STREET - FILE CITY OF EDMONDS -'-.PUBLIC WORKS DEPA RTMENT B A�C K - FLOW - - DEVICE TEST REPORT -- NAME OF PREMISES SERVICE ADDRESS LOCATION OF DEVICE D E V I C E: 900 - Manufacturer Model LINE PRESSURE AT TIME OF TEST As LBS. PRESSURE DROP ACROSS FIRST CHECK VALVE Size Serial No. LBS. CHECK VALVE NO. 1 CHECK VALVE NO. 2 DIFFERENTIAL PRESSURE RELIEF VALVE INITIAL 1. LEAKED 0 1. LEAKED El 1. OPENED AT LBS. TEST 2. CLOSED TIGHT 2. CLOSED TIGHT REDUCED PRESSPTE 2. DID NOT OPEN Lj CLEANED E] CLEANED 0 CLEANED 1:1 REPLACED: REPLACED: REPLACED: DISC ------------- DISC ------------- El DISC.UPPER ---------------------- 11 R SPRING ----------- I] SPRING ----------- 0 DISCAOWER ---------------------- 13 E GUIDE ------------ 11 GUIDE ------------ El SPRING -------------------------- E-1 P PIN RETAINER ----- El PIN RETAINER ----- 0 DIAPHRAGM, LARGE A HINGE PIN -------- El HINGE PIN ----- --- 0 ---------------------- UPPER --- * 0 I SEAT ------------- 11 SEAT ------------- E3 LOWER ------------------------- 11 R DIAPHRAGM -------- El DIAPHRAGM-; 0 DIAPHRAGM, SMALL S OTHER, DESCRIBE El OTHER, DESCRIBE 0 UPPER ----------- m -------------- 0 LOWER --------------- 0 SPACER, LOWER OTHER, DESCRIBE FINAL OPENED AT LBS. TEST CLOSED TIGHT ----- C1 CLOSED TIGHT ------ 11 REDUCED PRESSURE REMARKS: WoP .51"946' 40PC4-)'t_' THE ABOVE REPORT IS CERTIFIED TO BE TRUE: INITIAL TEST PERFORMED BY o4e4n,�eC-Vl OF DATE s,-19117,9 REPAIRED BY DATE FINAL TEST PERFORMED BY OF DATE �STREET FILE 1478 PUBUC UTILITY DISTRICT No. I of Snohomish County So kxTR (SuWry Atsa LlCAlll a 4-7 % &,DfA%V-AL W^V DATE 2A 0. S 4 -4 S I POLL NO. SWV4 S 21 T 27 R REVISION Owala S416�s :.FCASDNFCAWORK SET PO L-F- S -rn RAI--%F- EwahlER Ma.1061A FILE -G . DR024, :QK Eb,&T LAUr4r"Pe C. —ar OA07M t� APPROVAL DATE W ORK COMPLETED SU83TATWH F-DtAoWDS E"ROMMINTAL ANALY" FEES RE QUIREO YES No 0 X Ln�" 0 NOT wurr PRIMARY OVIRHEA&. PAPA ITE. CIRCUIT NO. LED$— O.H. LIZ, CONO.'— KV Or ADD —7— CKT. Fr. _ PH, '0- IFT. L-- REMY. — CKT. Fr. — PH, NET — CKT. FF. XXO III ON U-0 COND — Kv Aoo Fr: — PH. REMY. — CXT. FT. PH. JWRY OVERNEAlk. NET — CKT. FT. &—I FT. $— METER POLE 6 ... MIT& WE rvpg GP—TED PRIMARY UNDEFUIROUND. (AESIDENUALI Z:) TREE rRIUMING BASIC FEE 5 0 STATE W lqi4e I 1. 5-0 FT. 0 COUNTY 'X,OTV LEU 0 0— '0 11-1 FT 3— SECONDARY IJNCZRGAOUM&. BASIC FEE 5 "39MCKT3 .--20 6-1 FT. BASIC FEE S I c- tFT.0 S—AFT..S— STREET LIGHTING: DATE RELEAHO UNDERGROUND FLAT. 0 RlOu:RcO (3 NOT REOUIRED —tpT.0 S—AFT—S FOREIGN CONTACTS PRIMARY UNDERGROUND. (COUMEFOAU 0 GTNw JPN NO. BASIC FEE S — C CA T V JPN NO.. to S_fFT. 0 JOINT TRENCH GTE A CArV Fu PL ONIUQ SU50rVWON3 IS YR. REFUNDING) POLE STENCILING 2KMT FROM _.TO leg 'i TAKE OFF POLE 01111MANZOU3 FEM 5ET '55 POLF- I W LF-AQ OF toENnry VIR"EXTS Se p-v ICE ce-OPS AF ?A%--F- FM%S-T- SERv%CE%,- So Mila. ISN6. ACZ*S& 13 TREE TRIMMING 0 PLO LOCATOR Is — --- cl ONE CALL a BACKHOE 0 'v.AL. Z5'. SP"Ce AS WrEC.EZZAr-Y. 0 OTHER --71.= POSTED l(LEIC.L I KNU NE ISA p P Ly TR ANSF TWALCUM S CARDS I u-MAPs 4-71 AlI=lAor- SCAM POLE OEPT. DATE PAII�l. - I CIFOJITS. LOCATION NEW 3VC. APPLICATION P UAP PAGE 03 bw 23 -a DATE PRINTED DISPATCHER POSTED Ovick NO. STREET' FILE ADDITION TO ANCHOR BOATS - It is the determination of the Planning Staff that no substantial development is proposed within the established shoreline zone. DATED: January 20, 1978 L'afouir—elle, Director i,ty Development Department �ft� L4J F,"-, Mary LoflBlock AssociaN Planner 78 0 033 3 PR0JEC*A* iLkW C-a OZ nATE SUBMITTED ENVI RONMENTAL ASSESSMENT In order to meet the requirements of the State'Environmental Policy Act of 1971, the responsible official must make a declaration of environmental impact as early as possible in the process of evaluating a project. The infor;,,iation in this form will be used to determine whether it will be neces- sary to require an environmental impact statement. If an impact statement is not required, a Statement of Negative Declaration will be placed in the file. If an impact statement is required, a draft statement must be filed with this office, public notice given . and a review period of 30 days allowed. The final statement and comments must be filed with the.Department of Ecologyj Office of the Governor and the Ecological Commission. The Edmonds Planning Staff will assist you in any way we can in accumulating this information.and we would appreciate your cooperation. 1. Land: Area i n arafts C-4 Soils type _��kAlp Limitations. Description of topography (slope) Grading: estimated cubic yds. Filling: estimated cubic yds. 2. Water; Stream - estimated flow (gallons) per minute 0 /V Will stream be altered? To.what degree? Impact on storm drainage (increase in run-off) Estimated area to be paved Shorelines: within 20.0 ft. of Mean Higher High Water Adjacent*to shorelines zone 00 Envi'ronmental Assessment, page 2 3. Vegetation: Type of trees % to be removed Minimum diameter of trees to remain Ground cover % to be removed Proposed landscaping, if any 4. Existing Land Use within 300 ft. radius of proposed development: Vacant Single Fami 1 y Multi - Fami I y Comm. Other North South East Wes t 5. Ci rcul ati on: Estimated increase in auto trips daily Estimated -demand for'public transportation Degree of change on adjacent street s /V 2�:- 6.. Area of impact: neighborhood city-wide regional 7. Effect on air quality: WO /V/,C- 8. thanges in noise generation: Al /,20 00 Al 6W a 60-2 �g, 3 FILE .78=0033 FOMI FOR [XWQ�XR/FIXAL] DECLARATION OF ffffAWT*"ff /XONSIGNIFICANICE] Description of'proposal Building �ddition Proponent Anchor Boats Location of Proposal miral Way 4-71 AVIV110L, 14A/ Lead Agency City of Edmonds This proposal has been determined to [kqyv/not have] a significant ad- verse upon -the envirori.-icnt. An E1 S [iklis not] required under 10-1 43.21C.030(11))(d). This decision v.,as made after review by Lhe lead nency of a co-nDletcd environm.cntal chec1dist and other information. on file with the lead agency. Responsible Official John A. LaTourelle Position/Title Director of Community De . velopment January 23, 1978 Signature Date 780033 E N V I R 0 N M E N T A L C H E C K L I S T F 0 R M TO ACCOMPANY PORT OF.EDMONDS AP PLICATION FOR BUILDING PERMIT AT ANCHOR BOATS BACKGROUND, I . .2. 3. 4. 5. A ILI G 6 SEGUR I TY FENG I NG. LEASE TRACT AT EDMONDS HARBOR A�tvi-n o,4 Name of Proponent: A),ACAAVV-- -606,fs Add�ess. and Phonip Number of Propcinent: 456 Admiral Way Edmonds, Washington 98020 Tel. 774-0549 'Date Check)ist-S.ubmitted: May 11, 1977 -"TAkf*A - ;ZV, IAI*. Agency Requiring Checklist: City of EAonds Name' of Proposal, if applicable: P43;i-Q Q)Qd "noing a �tract SWILMINOC 1FA , to Anchor Boats,.Inc.' IF. Nat're and.Brief Description of the; Proposal (inc'luding but not, limitted to its size, general design elements, and'other fi�ctors' that will give an accurate understanding of its scope and nature) - a. 'Perform finish grading, place c' rushed rock base and -pave with asphalt concrete an aggregate area of.approximately 1685 square yards., to provide (1) improved access ways for moving boats into and out'of open storage and exhibit areas and service building, and (2) more usable operations area; and BUAI-v 5MA-14- Offlcv� AtPVr10l`A b. Install approximately 435 lineal feet of 6-foot�high chain_LdLnk I security fence, with 3 gateways, . as protection againsterev theft and vandalism. b%kA"t> 5rj\ALI�- W;>Gc- Avpj- /otk<ff� Loca':tion of Proposal (describe the physical setting of the pro- posal, as well as the extent of the land area affected by any envi:ronmental Impacts, Including any other information needed to giveian accurate understanding of the environmental settir-g of the, oroppsal): A tract.100 feet wide by 360 feet long -situated between Admiral Wa y and Burl'ington Northern Railway Company RIW, comprising'Lots 1, 1 2 and 3 of preliminary plat.,,copy attached. This land formerly wa ' a part of a.barrier tidal slough owned by Burlington Northern, and reclaimed by landfill from dredging of the Port of Edmonds South 11arbor moorage b,2sin� in 1962. Since that time it has been zoned CW,;',and used first jfbr boat trailer parking, and thereafter a boat sales center, with a building basically 40 feet wide by 90 fe , et long, with an.,attached offic�e ell 20 feet by 30 feet, as depicted on the attached drawings. The plite has supported no vegetation except an occasional weed patch. Someillimited ground area.has been paved, but the greater part of the �iB unpaved, and with inadequate gravel surfacing;over,the original area, oand'fill. The ground topography is flat and poorly drained. GreatZy increased operational activity has resulted in creation of -extensive Tud holes during rainy weather, creating unsuitable conditions for Present and contemplated operations, as well as being unsi' qhtZy and a nuis�znce to operating personnel and prospective.buyers. tantial and Anchor Boats., Inc., now maintains -at this site a subo costly inventory of boats available for saZe and delivery. Losses from theft and vandalism necessitate the installation of security fencing. Phis is to.be of heavy duty gaZvani�;(-.-�d chain -link fabric3 connecting.on t.he-north to 'similar exidting-,,ecurity fencing previously. installed by Boat. Loft�* Inc. The security,fencing will be compatible with its surroundings.- but also will be made more, attractive by selective evergreen plantings along'the.portion exposed to view from Admiral Way. A 7vo is offiC-�E ADPrrtof4 -1-0 B-f, j� OA GC Yes Maybe No f Alteration 0 t: the direction or rate o flow of 9 round.. w a te rs,? X (9) Change in the quantity of ground watc:rs either through.direct additions or withdrawals, or through interception of.an aquifer by cuts or excavations? X, ('h Deterioration i'n ground waterquality, e,ither through direct injection, or through the seepage of leachafe, phosphates, detergents, water.1borne virus or bacteria, or other sub- s;tancos -into the ground -waters? X 0 Reduction in the.amount of water other- wise a.vailable for puo'l'ilc Water supplies? X Exo1anation: The'�,general surface drainaq e pattern will remain unchanged., but runoff wiZZ be mildly accelerated by the r�_gr_aTi_ng to eliminate puddles and mudholes,, and by the increase in the propoIrtionate area of paved areas. (4) Flora. Will the proposal result in: (e). Change in the diversity of species, or numbers of any species,of flora (including trees, shrubs, grass, crops, microflora and aquatic p.lants)? X (b Reduction of, the numbers of any unique, raze or endangered species of flora? X (c.) Introduction of new species of flora into an area, or In a barrier to the normal replenishment of existing species? X (d) Reduction in acreage of any -agricultural crop?': X Eyplanation: Landscaping will incZude pZantinas of, selected species of evergreen vegetation -with optirmult aesthetic value. (5) Fauna. Will the proposal result in; (a). Changes in the al''ersity of species or Yes Maybe No numbers o f e s f fauna (birds, land any 5peci 0 an i ma Is i nc I u,d i rig repti les, fish and 5hel I fish, benthic organisms, insects or micro-fauria)? X (b) Reduction of the numbers of any Ulli(.JUL�, rare or endangered species of fauna? -7- X (c) introduction of new species of fauna into an area,,or result in a barrier to the migration or movement of fauna? X (d) Deterioration to existing fish or wildlife habitat? X Explanation: None entailed. (6) Noise. Will the proposal increase existing noise ]eve Is? X Explanation: None entailed. Light and Glare. Will the p roposal produce new,light or glare? X Explanation: None -entailed. (8) Land Use. � Wilithe proposal. result in the �;-Iteration of the present or plinned land use of an area? Explanation: None entailed.. Yes Maybe No (f) Changes in.depoSiLion or erosion of t)each sands, or c.hanges in si Itation, depos.i-tion or erosion which may -modify the channel ofl,.a river or stream or the bed or the ocean or any bay, inlet or'lake? X Exp lanation:. (b)(c) The existina poorZq (Irained groun&-surface will —FxF be moderately resha ped to she surface water efrect-bvety to an a t in g drainage swale on the east. Critical �Ortions of the access and­ operatibnal areas will be baYlasted and pavea to support wheel -loads and preserve the surface. (2) Air.. Will the -proposal result in: (a) Air emissions or deterioration of ambient air quality: X �b) The creation of objectionable odors: X (c) Alteration of air movement, moisture or temperature, or -any change in climate, eiLher. locally or regionally? X Explanation: None entailed (3) Water. Will the proposal,result 0: (a) Changes in cuerents, or the course or direction of water movements, in e ither.mari-ne X or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? X (c) Alterations to -the course of flow of flood waters? X (d) Change in the amount of surface water in any water body? X (e) Pischarge into surface waters, or i n. a ny-alterat . ion of surface water quality, including but not.limite.d to temperature, X dissolved oxygen or turbidity? 9. List of all, Perm1 ts Li censes or Go ve rnmen L Approva I s Requi red for the Proposal. (federal:., s-tate and local. -- in.cluding rezones) (�-ij Approved bu Amenities Desion Board NaU 4. Z977. (b) guildina Permit a12121ication submitted J.L)vil '19?7. pending. R-Mrr, 5 w6rn I ITF-V 12. - ;BLOC.- Or, '.101. Dol.yo'u have any plans for future addiLions, expai.ision., 'oi- fur'Lher activity related to or connected with this proposal? 11 f yc�s &xplain: FjnaZ detaiZed Zgndsa4 f=nighad to Amenitie,- pesi"_ WjW 121an to hp Bbard, .1 1 . Do� you know of any plans by others which may affect th6 property covered by your proposal.? If yes, explain: 12. A,ttach any other application form that has been completed regard- ing*the proposal; if none has been completed,. but is expecL ' ed to be fliled;'at some future date, describe the nature of such appl,ication form: N6ng 111. 'ENVIROVMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) Yes Maybe No (1) Earth. Will.the proposal result in. (a) Unstable earth conditi.ons or in� changes i6 geologic substructures? X (b) Disruptions, displacements, compaction or ove rcove r i ng of the soi I ? Y CC ) iChange in topography or ground surface �,,-Iief features?' (d) 'The -destruction, covering or modification. of-, any unique 'eo.logic or physical feaLureb? X 9 (e,)' 'Any increase,in wind or water erosion of spils, either.on or off the site? X Yes ' Maybe � No . ` (9) Natural Kes"�fi=, W/| the prmpo�ua| resu/i in/ . (a) Increase inthe rate of use of any natural resources? X /b\ Depletion f ' , ' o an� nomrenewab|e natura| resource? . X -- Exp|anation/ . 7tai Zed. ' U) (i ` ^ n/sn or Does the proposal involve a ' o risk r an e�plos�o/�mr the release o[ ha�ard-. ^ ous substances (including, but not limited to Oil, Pesticides, -chemicals or radiation) in' , the event of an accident or upset conditions? _X_- Ewplaoatimm: zpd- ' . ` ' /|7) Pm | �| Will �h� proposal alter the ----- /mcaL|.,n, distribution, density, or growth rate of the human Population of an arma/ � Explanation:' ' ' (12) Housing.. Will the proposal affect existing. ` �--- "wu^/ng, or create a demand for additional housing? _-X-_ [ Explanation:,- � . Yes Maybe No (13) Transportat ion/C i rcU I at i on Wi I I the p r�:jpo,� a I resu I t i n: (a) Generation of additional vehicular movement? X (b) Effects on existing parking facilities,, or demand for new parking? X (c) Impact upon existing transportation systems? X (d) Alterations to present patterns of circulation or movement of people and/or qoods? X (e) Alterations to waterborne, rail or air traffic?* X M Increase in traffic hazards to motor vehicles*, bi.cy clists or pedestrians? X Explanation: Npna gntaiZed. (14) Public Services. Will the proposal have an. effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? X (b) Police protection? X (c) Schools? X (d) Parks or. other recreational facilities? X (e) Maintenance of public facilities., including roads? X (f) Other governmental services? X Explanation: None entailed- (15) Energy. Wi I I the p ro'p'osal re.sult in: (a) Use of substanti'a.1 a'inounts of'fud'F or energy? (b) Demand upon exis ting sources.of energy, or require the development of -new sources of energy.? Explanat-ion: None entaiZed. Yes Maybe No X U t i I i t i e s Will. the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? X (b) Communications systems? X (c) Water? X (d) S ewe r or septic tanks? X (e) Storm water drainage? X M Solid waste and disposal? X Explanation: None enta led, (17) Human Health. Will. the proposal . result in the creation of-'�any *hecil-th hazard or. poten,tial health hazard (,excluding mental health)? X Explanation: None entailed, Yes Ma,!be No (18) Aesthetics. Wi I] the proposal result in the obstruction of.,any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically offensive site open to public view? Explanation: The aitta 7,7,M ha nzada mare e7jo_qthat�galZu attractive to public view.' (19) Recreation. Will the proposal result in an impact upon the quality or quantity of.existing .recreational opportunities? X ...Expi-anation: 4e en4nymoyii- . n;C 7ein-k-;aa e7l, (ar m1*.ndex,)_ahn1212jna for) new boats, even without a&nission'to the �oat storage yard, can a-utinue 4 reason a2f tho 9pp-n nhnranyPar n4 tha fann�= Migah- (20) A,rcheological/Historical. Will the proposal rasu.It in an alteration of. a significant archeological or historical site, structure, object or building? Explanation: Nnnn an*a�Zpd, 1'.11. SIGNATURE 1, the undersigned, state that to the best of my knowledge the above information is true and complete� It Is understood that the lead agency may withdraw any declaration of non -significance that it might issue in reliance upon this check] ' ist should there be*any willful misrepresentation or wl Ilful lack of full: disclosure on my part. The -Port of.Edmonds, as an initial Agency, under SEPA, proposes a declaration of non -significance for this project w rk. Proponent: Attachments: Conceptual Planting Plan Project. Plan, Dwg. 3-55EN Preliminary Plat, Burlington Northern, Inc. (Purchased by Port of Edmonds) 14 kil vf .4 � 11 IN 44 .1 Aj. 1-2 ...... ..... IT U 11 LM... ... ... AL ;4-4 In rf T� 7 -1 '2 FILE # FORM FOR MMDM- DECIAWTION OF XXXK=K/iNO,\TSIGI\IIJ,IC)V�CF,-] Description of proposal Grading, graveling, paving and fence. Propcment Anchor Boats,_Inc. Location of P"roposal, 471 Admiral Way Lead Apency City of Edmonds 1his proposal has bec-n Octe-Lni-ned to [hmx/Tiot havel a sianific,ant- ad- 1 0 verse 11pon environ"'icnt. An El. S ��is not] reqUired undo-C L RCTI 43.21C.030(2)�'(�). This clecif;inn v.,as iiia-cle after review by I -lie lead agcn.,.), of a con-q)Ictecl oiyvironi,,crital chechlist and other inforiiiation on. file with the le --id auency. ResponsibIc Official E. Joseph Wallis Posj.tioj�/Titje Director of Community Developmer�t Date May.24, 1977 aff4e /010" RECEIVED E N V I R 0 N M E N T A L C H E C K L I S T F 0 R M MAY 16 1977 City of Edmonds C&nmunity Devel. Dept, TO ACCOMPANY PORT OF EDMONDS APPLICATION FOR BUILDING PERMIT FOR ASPHALT PAVING & SECURITY FENCING AT ANCHOR BOATS, INC., LEASE TRACT AT EDMONDS HARBOR 1. BACKGROUND 1. Name of Proponent: Port of Edmonds 2. Address and Phoni� Number of Proponent: 456 Admiral Way Edmonds, Washington 98020 TeZ. 774-0549 3. Date Checklist Submitted: May 11, 1977 4. Agency Requiring Checklist: City of Edmonds 5. Name of Proposal, if applicable: Paving and fencing at tract Zeased to Anchor Boats, Inc. 6. Nature and'Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): .a. Perform finish grading, place crushed rock base and pave with asphalt concrete an aggregate area of approximately Z685 square yards, to provide (1) improved access ways for moving boats into and out of',open storage and exhibit areas and service building-, and (2) more u6-able operations arta; and b. Install approximately 435 Zineal feet of 6-foot high chain Zink security fence, with 3 gateways, as protection. against prevalent theft and vandalism. 7. Location of Proposal (describe the'physical setting of the pro- posal, as well as the extent of the land area'affected by any environmental impacts, including any other information needed to give an accurate understanding of the environmental setting of the proposal): A tract 100 feet wide by 360 feet Long situated between Admiral Way and Burlington Northern Railway Company RIW, comprising Lots Z, 2 and 3 of preliminary plat, copy attached. This Zand formerly was part of a barrier tidal slough owned by Burlington Northern, and reclaimed by ZandfiZZ from dredging of the Port of Edmonds South Harbor moorage basin in Z962. Since that time it has been zoned CW, and used first for boat trailer parking, and thereafter a boat sales center, with a building basically 40 feet wide by 90�feet Zong, with an attached office eZ1 20 feet by 30 feet, as depicted on the attached drawings. The site has supported no vegetation except an occasional weed patch. Some Zimited ground area has been paved, but the greater part of the area is unpaved, and with inadequate gravel surfacing over the ori inal 9 sand fiZZ. The ground topography is flat and poorly drained. Greatly increased operational activity has resulted in creation of extensive mud holes during rainy weather, creating unsuitable conditions for present and contemplated operations, as well as being unsightly and a nuisance to operating personnel and prospective buyers. 00 90 Anchor Boats, Inc., now maintains at this site a substantiaZ and costly inventory of boats available for sale and delivery. Losses from theft and vandallsm necessitate the installation of security fencing. This is to be of heavy duty galvanized chain -link fabric, connecting on the north to similar - existing security fencing previously installed by Boat Loft, Inc. The security fencing will be compatible with its surroundings, but also will be made more attractive by selective evergreen plantings along the portion exposed to view from Admiral Way. 9. List of all Permits, Licenses or Government Approvals Required for the Proposal (federal, state and local -- including rezones): e,7) &2�royed by Amenities pesi�m Board MaU 4. 1977, (b) Building. Permit a1212lication submitted APril 28, Z977. action pending. 10. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain: FinaZ detaiZed Zandscapiva 12Zan to be f=niqhed to Amenitieg pasiga- Board. II. Do you know of any plans by others which may -affect the property covered by your proposal? If yes, explain: None 1 12. Attach any other application form that has.been completed regard- ing the proposal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: None ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) (1) Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? (b) Disruptions, displacements, compaction or ove rcove r i ng of the soi I ? (c) Change in topography or ground surface re-1 ief features? (d) The destruction, covering or modification of any unique geologic or physical features? (e) A'ny increase in wind or water er6sion o" f soils, either on or off the site? Yes Maybe No X X X 0* 40 Yes Maybe No (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed or the ocean or any bay, inlet or lake? X Explanation: (b)(c) The existina poorly drained ground,surface will be moderately reshaped to shed surface water effectively to an e sting drainage swaZe on the east. Critical ortions of the access and operational areas will be ballasted and paved to support wheeT loads and preserve the surface. (2) Ai r. Will the proposal result in: (a) Air emissions or deterioration'of ambient air quality: X (b) The creation of objectionable odors: X (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? X Exp lanation : None entailed (3) Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course of flow of flood waters? (d) Change in the amount of surface water in any water body? (e) Discharge into surface waters, or in any alteration of surface water quali-ty, including but not limited to temperature, dissolved oxygen or turbidity? X X X X Yes Maybe No M AlLeration of the direction or rate,of f low of ground waters? X (g) Change in the quantity of ground waters, ei th6r through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? X (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne vi rus or bacteria, or other sub- stances into the ground waters? X M' Reduction -in the amount of water other- wise ava.ilable for public water supplies? X Explanation: The qeneraZ sur -face drainade Pattern wiZZ remain unchanged, but runoff will be mildly accelerated by the r�_gr_aTi_ng to eliminate puddles and mudholes, and by the increase in the proportionate area of paved areas. (4) Flora. Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees,.shrubs, grass, crops, microflora and aquatic plants)?. (b) Re�duction of the numbers of any unique, rare or endangered species.of flora? (c). introduction of new species of flora into an area, or in a barrier to the normal repleni shment of existing species? (d) Reduction in acre'age of any agricultural - X PRO X crop? X Explanation: -Landscapinq will include plantings of selected . I - species of evergreen vegetation -with optimum -aesthetic value. (5) Fauna. Will the proposal result in: (a) Changes in the diversity of species, or so to Yes Maybe No numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or micro -fauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration to existing fish or wildlife habitat? Explanation: None entaiZed. X X 0 X (6) Noise. Wi.11 the proposal increase existing �noise levels? X Explanation: None entaiZed. (7) Light 4nd Glare. Will the proposal produce new I ight or glare? X Explanation: None entailed. (8) Will the proposal result in the alteration of the present or planned land use of an area? X Explana'tion: None entaiZed. 00 to Yes Maybe No (9) Natural Resources. Will the proposal result in: (a) increase in the rate of use of any natural resources?-2 X (b) Depletion of any nonrenewable natural resource? X Explanation: None entaiZed, (10) Risk of Upset. Does the proposal involve a risk of an explosion or the release of hazard- ous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in the event of an,accident or upset conditions? X Explanation: Nong ente7iZed. (11) Population.. WHI the proposal alter the location, distribution, density, or growth rate o� the human population of an area: X Explanation: Nnno_ an*t7iZed. (12) Housi-no. Will the proposal affect existing housing, or create a demand for additional housin6? X Explanation: Nonp Pnl-aiLgd. Yes Maybe No (13) Transportation/Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? X (b) Effects on existing parking facilities, or demand for new parking? X (c) impact upon existing transportation systems? X (d) Alterations to present patterns of Circulation or movement of people and/or goods?' X (e) Alterations to wate'rb.orne, rail or air trafficT X (f) lhcrease in traffic hazards to motor vehicles, bicyclists or pedestrians? X Explana'tion: Nong antailad. (14)� Public.Services. Will the proposal have an effect ' upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? X (b) Police protection? X (c) Schools? X (d). Parks or other recreational facil ities? X (e) Maintenance of public facilities, including roads? X (f) Other governmental services? X �Explanation: None ente7.i Z d. Yes Maybe No (15) Energy. Will the proposal re.sult in:. (a) Use of substantial amounts of fuel or energy.? X (b) Demand upon existing sources of energy, or require the development of new sources of energy? X Explanation: None entailed. 06) Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? (b) Communication.s systems? (c) Water? (d) Sewer or septic tanks? (e) Storm water drainage? M Solid waste and disposal? Expl-anation: None entaiZed. X X X X X X (17) Human Health. Will the proposal result in the creation of any health hazard or potential health hazard (excluding mental health)? Y Explanation: None entaited. Yes Maybe No (18) Aesthetics. Wi I I the proposal result in the obstruction of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically offensive site open to public view? X Explanation: Th,0 0 LiM hp mada mrp aeatheticatlu attractive to pubZic view. (19) Recreation. Will the proposal result in an impact * upon the quality or quantity of existing recreational opportunities? X Explanation: v2e (nr 7J1.*nde)7J-shn12U�na r) Jf0 new boats, even without admission to the boat storage yard, can Continue by reason--a4 -the apon charantgor nf thp- fane-i2W mpah- (20) Archeological/Historical. Will the proposal result in an alteration of a significant archeological or historical site, structure, .object or building? Y Explanation: Nong gntaiZgd. I'll. SIGNATURE 1, the undersigned, state that to the best.of my knowledge the above information is true and complete. It Is understood that the lead agency, may withdraw any declaration of non -significance that it' might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. The Port of Edmonds, as an initial Agency, under SEPA, proposes a declaration of non-Aignificance for this ol t work. I IPORT OF EDMONQ Proponent: Port Engineer Attachments: Conceptual Planting Plan Project Plan, bwg. 3-55EN Preliminary Plat, Burlington Northern, Inc. (Purchased by Port of Edmonds) WiNDOW 45L VA'(24 LL ~ °-�-v ' ^ � ---------------------------'------' -%/-----� ----- 7 8j�v�� ^* - -- ----'----- JAMES H. REID LEROY F. MIDDLETON C. WAYNE JONES LLOYD H. NELSON Rea, 7&44&a" o4"4cWa, I". ENGINEERS e SURVEYORS* PLANNERS 324 Main Street 0 Edmonds, Washington 98020 0 (206) 775-3434 May 13, 1977 FZECEIVED. File No. 3.55 MAY 16 1977 Mr. E. Joseph Wallis, Director City of Edmonds Community Development Department Community Devel, Dept., City of Edmonds Civic Center 7701--:1.27 Edmonds, Washington 98020 Subject: Building Permit for -Site Maintenance and Improvements at Anchor Boat Site, Port of Edmonds Dear Mr. Wallis: In response to your letter of May 11, received this noon, I have made field measurements, and marked on.the attached map exhibit, the arc line of 200-foot radius from the nearest corner of the boat harbor bulkhead. A rigid interpretation would establish that arc line as the 200-foot line -from mean high tide line, even though the top of the lower bulkhead step, which is a*t elevation +9.Ot.is about 12 feet further dis- tant. These measurements indicate that a triangular area 18 feet by 38 feet, totalling approximate.ly 38 square yards, of proposed.asphaltic surfacing lie's within 20O.feet of harbor water contact at elevation +10 feet ML LW. The paving of this area is clearly a maintenance activity, to eliminate mud and puddles from the main entrance to the Anchor Boat building. Yo , u may note from the drawing that it terminates at present at an existi , ng con- crete slab on the south and against a concrete curb and paved street on the west, which interferes with surface water escapement and contributes to creation of mud holes. If -inclusion of the.paving of this tria.ngular area interferes with the issuance of the requested permit, please r , egard it as being excluded from the present permit application, and we shall resubmit thi s portion separately. Can we believe that any legislator, in supporting pass.age,of the Shoreline's Management Act, intended an interpretation of the Act'in as meticulous and rigid a manner? Please inform us as to the action which you feel can be taken next toward issuance of a building permit. Sincerely, REID, MIDDLETON & ASSWVTES, INC. JHR:bb Encl. *s V4. e �id cc: Port of Edmonds, Anchor Boat MUNICIPAL ENGINEERING e WATER SUPPLY WASTE TRE MENT e SURVEYS & CADASTRAL ENGINEERING AIRPORT PLANNING & DESIGN e MARINAS PORT & IND STRIAL DEVELOPMENT e FEASIBILITY STUDIES MEMO TO THE FILE - May 16, 1977 7 t, � . ,,- TI.-A.-77 ANCHOR BOATS. INC. This is to verify that a review of the proposed work at Anchor Boats does not require a Shoreline Permit for the following reasons: 1. All surfacing is a maintenance project correcting drainage and eliminating muddy conditions. 2. The value of the proposed fence installation is less than the $1,000 limit stated in WAC 173-14-040 according to the letter in the file from Don Martin dated May 16, 1977. 0 40' I'll + VO, ...... . . . . _% co lb 0 SCALE I".= 100' do CITY of EDMONDS STREET FILE. 200 Dayton Street - Edmonds, Washington 98020 - Telephone (206) 775-2525 Department of Public Works September 30, 1975 10�A /Mr. Bill Karr .Boat Loft 46S Admiral Way Edmonds., Washington 98020 Dear Mr. Karr: On September 22, 1975, Mr. Ken Kukuk, a Cross -Connection Specialist for the City of Edmonds, conducted a cross -connection control inspection of your facility. During this inspection, problem areas were noted and the necessary corrections are as follows: 1. To conform with State and City regulations pertaining to cross - connection and backflow prevention, an approved double check valve assembly must be installed on the main service line prior to any branching and before any yard spigot. 2. All yard spigots require the installation of hose bibb atmospheric vacuum breakers (equal to Watts #8A). 'Attached please find (a) excerpts from the "Accepted Procedure'and Practice in Cross -Connection Manual," which will indicate proper instal- lation procedure. Also attached is (b) the September, 197S, copy of the "Approved Cross -Connection Control Devices" accepted by the State of Washington, Department of Social and Health Services and the City of Edmonds, and (c) a copy of the City of Edmonds Ordinance #1711,. requiring the installation of backflow prevention devices. Mr. Kukuk will be making a final inspection on November 4, 1975, which we feel gives you sufficient time to make the necessary plumbing corrections. If there are any questions concerning these corrections, please contact the Water/Sewer Department at 775-2525, extension 226. Sincerely, SIGNED J. HERB GILBO Director KKK: j t Attachments T�; Tw� .,­­ ­., - - , -,.-; , Attadment (a) PIT INSTALLATION OF DOUBLE CHECK VALVE ASSEMBLY LOCKED COVER RECOMMENDED' wyl E 'INTERNALLY LOADED DOUBLE CHECK VALVE ASSEMBLY 'E'R ADEQUATE DRAIN -NOT TO SEWER RECOMMEND PROVISIONS BE MADE TO DRAIN VAULT PROVIDE ADEQUATE. ROOM IN VAULT FOR REPAIR AND TESTING PROTECT DEVICE AGAINST FREEZING PLUG TEST COCKS April 26, 1974 Mr. William Karr,, President Boat Loft, Inc. 465 Admiral Way Edmonds, Washington 98040 SUBJECT: Marine pyster Crossing, Dear Bill: Pursuant to your letter of April 23, 1974, relative to a Marine Hyster crossing on Admiral Way, the City would offer the follayin's suggestions: 1. For compliance to State and City Codes, sirning must be Installed in accordance with recognized Standards. 2. A sketch of a proposed installation Is attached for your use. 3. The City will assist you it location of the signing. If you need any further informatim , please contact this office. Yours very truly, CITY OF EDMONDS LEIF R. LARSON City Engineer WJN:LRL:mir Attachment j, tr� 77 A A M, 10A, a ELLO, W, G 16 7MR i FMV t Tl� 41 t P, -11 N5!A_ IL! t --T 4- --4- RICEW"D *80AT LQFT11C1'* 465 ADMIRAL WAY 0 EDMONDS, WASHINGTON 98020 774 - 6515 April 23, 1974 Mr. Leif Larson Engineering Department .OL Ic City of Edmonds 1_0L /C I Edmonds, Washington 98020 ric ,::2 to, a 1e, C"C' Dear Mr. Larson, TO Boat Loft, Inc. is constructing a boat launcher in the Port of Edmonds area, on our property immediately north of the Edmonds Yacht Club. In order to most efficiently serve the public and our customers, we will be crossing Admiral Way with boats on our Marine Hyster. It is our desire to do this as safely as possible, with a minimum of disturbance to the traffic flow on Admiral Way. During the past three weeks, we have been entering Admiral Way through our new driveway; this same driveway will be used upon the completion of our launcher. In order to operate as safely. as possible we have added a rotating hazard light to our Hyster. Additionally, we will be installing two convex mirrors to allow full visibility both North and South along Admiral Way prior to entering the street from our property. In our opinion, and that of Safety and Supply Company, these steps which we are taking are as much as can be done within the area under our control. To afford the maximum safety to the public, perhaps your depart- ment could assist us with suggestions. Mr. William Nims has met with me to discuss this and has been most helpful. We will appreciate any assistance you can offer. WK/pd Very truly yours, William Karr, President BOAT LOFT, INC. ENGINEERING REQUIREMENTS FOR COMMERCIAL AND APARTMENT BUILDING PROJECTS STREET FILE Boat Loft Inc. Name Monorail Boat Launcher Date March 25, 1974 STREETS AND ACCESS 1. Right -of -Way Requirements: 60' existing 2. Road Bed Width: N/A 3. Turn Around: N/A 4. Sidewalks: N/A 5. Parking Strip: N/A 6. Access Easements'- None UTILITIES 1. Water Mains: N/A 2. rire Hydrants: None required 3. Sewers or Septic Tanks.'- N/A 4. Drainage: Install all necessary storm sewers and drainage facilities per drainage plan and City Standards. Where drainage is across adjacent private property, all parties having any ownership interest in the lands tieing developed shall provide, as a restriction on th " e title running with the landt that the City of Edmonds shall be held harmless from any and all claims for damages which may be occasioned to adjacent land by reason of the construction and operation of the drainage system, unless, releases of damages and/or drainage easements are obtained from the other property owners affected by said drainage. Any drainage problems created by change of contour during development must be corrected, prior to occupancy permits or release of performance bond.* Final approval (or release of bond) will be withheld until actual drainage as installed has been inspected by -the City Engineer. Engineering Req ents for Commll Apartment Buildoo Se 2 5. Utility Easements: 6. Underground Utilities: To be provided in accordance with Ordinance No. 1387. Street lighting shall also be provided with the necessary street light standards and underground wiring. TOPOGRAPHY 1. Excavation and Grading: Excavation and grading shall conform to the requirements outlined in Chapter'70 of the Uniform Building Code, latest adopted edition, Vol. 1. Where extensive gr4ding and fill are involved in the development, a grading plan and specifications shall be prepared. QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS 11.02.025(f) Utilities and Street Improvements. No building permit shall be issued for the construction of any building or structure of any kind or description unless the plans and specifications include the construction for clurbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and storm drainage necessitated by the new construction or improvement, to be built to applicable City standards, provided, however, if found by the City Engineer to be impractical to construct at the time of application for said building permit, construction may be waived by the City Engineer and in lieu -thereof a performance bond filed with said engineer to cover the estimated cost of construction to City standards for said improvements, provided further, in areas zoned singlefamily residential at the time of said application for building permit in which the applicant has received final approval for a plat or sub -division and has compiled with requirements therein compliance with this subsection shall be deemed by compliance with the sub -division or plat requirements. COMMENTS Rev. April 2, 1971 MW E T STREE FILE Amenities Design Board - Regular Mept ng - Februar 27, 1974 - Page 3 T;ie Ch irman declared a IU minute rec-3s at 9:25 p.r Fr)llow,ng re�.ess the Cnairman stated rhat thL� last two items on the agenda, which would r,-quiry a short time to hear, w,juld be heard f rst. AOB-9--1 Walt Lester. Addition to b iness sign (e,,istina sign) at 1047 L 11 - - Puget Drive. (BN) Mr. Wallis showed slides of the exist ng sign and the site. He said that "r. Lester had stated that because of a p,evious comrnittmpnt he could not be at the hearinc until later in the evening. fir. Wallis explained the application. The new sign will have landscaping at the base and will ue in conforyunce to th( BN sign regulations. IT WAS MOVED BY MR. GOLDSMITH, SECOND, ) BY MR. WESTLIN IHAT Ar)9-9-74 BE APPROVED A', APPLIED (:arripd unanii ously. A16-8- Boat Loft, Inc. at launc: in(i faci,ity for public launching and - Of C ; C ; rriFs__Iff 80' a! of t. 46 Admiral 'day. (CW) Mr. Wallis presented slides of the si e and rp;iewed the application. Bill Karr, Boat Loft, Inc. was in the -i ud i ence . ;if, explained to the Board that this was a monorail launcher with a m, rine for� I �tt to bring tho boats from the loft across the street for launching. Mr. Goldsmith asked Mr. Karr if the P( rt of Edrionds intends to acquire the property and he said he did not know. Paul Roy, 844 Alder Street said this vds greatly needed in the summer. People stirt lining up at 3 A.M. In order to use the one launcher that is there at the Port of Edmonds. A mOTION WAS MADE BY rIR. WESTLIN, SEC(NDED BY MR. RIZZUTO THAT ADB-8-74 BE APPROVED AS APPLIED FOR. Motion carried unanirously. ADB-6-74 Alaska Publishipg, Binding, Distribution and storage of pertinent ffiafeHaTs ui�_d_jn the publishing of printed m.:4tter. 130 2nd Ave. Immediately north of existing building formerly Crow Hardware. (BC) Mr. Wallis showed slides of the site and said this was a preliminary review asked for by Harbor Construction. Bruce Beard, Harbor Construction was in the audience. representinq Alaska Publish- ing. He explained that this was a temporary Structure which would be a steel structure. It would have trim of sandstone material the same as the existing build- ing. Landscaping and walkways would be install,�d. Mr. Beard said thty do not have landscape plans at present but would prepare them. He said this is a problem area as the water table is high. All structural work must be done on pilings. The building primarily will be used for as'iembling, binding and shipping of printed materials. Paul Cook said if the applicant wants t metdl building then they should attempt to screen it as much as possible. Mr. Beard said they asked for the preliminary hearing in order to get as much input from the Board as possible for guidance a,, to what they wanted and would accept. mr. Wallis said a traffic count had shown appro�imately 600 1-9�1_ars a fie suggested that the building locition be7hanged a. Ty.tr_, c Sunset 'day. a e rm 1 sfalled. This would soften the impact of the biilling. P, �5 0 K) ENGINEERING� REQUIREME14TS FOR COMMERCIAL AND APARTMENT BUILDING PROJECTS Name Boat Loft, Inc. Date February 12, 1974 STREETS AND ACCESS 1. Right -of -Way Requirements: None 60' existing - 2. Road Bed Width: 44'.Existing 3. Turn Around: N/A 4. Sidewalks: N/A 5. Parking Strip: N/A 6. Access Easements: N/A UTILITIES 1. Water Mains: 8" C.I. existing .20 Fire Hydrants: None Required .3. Sewers or Septic Tanks: Connection to sanitary sewer required STREET -FILE 4. Drainage: Install all necessary storm sewers.and drainage facilities per drainage plan and City Standards. Where drainage is across adjacent private property, all parties having any ownership interest in the lands being developed shall provide, as'a restriction on the title running with the land, that the City of Edmonds shall be held harmless from any and all claims,for damages which may be occasioned to adj acent land by reason of the construction and operation of the drainage system, unless, releases of damages and/or drainage easements are obtained from the other property owners affected by said drainage. Any.drainage.problems. created by change of contour during development must.be corrected.. prior to occupancy permits or release of performance bond. Final approval (or rellease of bond) will be withheld until actual drainage as installed has been inspected by the City Engineer. Engineering Re ir ents for Commll & Apartment__Bui oj5ft- - Page 2 5. Utility Easements: None 6. Underground Utilities: To be provided in accordance, with Ordinance No. 1387. Street lighting shall also be provided with the necess ' ary street light standards and underground wiring. Street lighting not required TOPOGRAPHY 1. Excavation and Grading: Excavation and grading shall conform to the requirements outlined in Chapter 70 of the Uniform Building Code, latest adopted edition, Vol. 1. Where extensive grgding and fill are involved in the development, a grading plan and specifications shall be prepared. QUOTATION FROM THE CITY CODE REGARDING IMPROVEMENTS 11.02.025(f) Utilities and Street Im provements. No building permit shall be issued for the construction of any building or structure of any kind or description unless ' the plans and specifications include the construction for cbrbs, gutters, sidewalks, paved streets, necessary water lines, sewer lines, and storm drainage necessitated by the new construction or improvement,' to be built to applicable City.standards, provided, however, if found by the City Engineer to be impractical to construct at the time of application for said building permit, construction may be waived by the'City Engineer and in lieu thereof a performance bond filed witli said engineer to cover the estimated cost of -construction to City standards for said improvements, provided further, in areas.zoned singlefamily residential at the time of said application for building permit in which the applicant has received final approval for a plat or sub -division and has compiled with requirements therein compliance with this subsection.shall be deemed by compliance with the sub -division or plat requirements. COMMENTS Rev. April 2, 1971 Z!-ilty Tngineer EETT.'. J.- "ET I EDVONDS COUNCIT-1-1 -NG 1 fill ThS FEBRUARY 9, 1,�474 J)W (;o "111 C �i I. ill �q I I I t; e l 1 to J)tt:.� C 0 '1 ill e �Com ic Uman 11'eloon mov,;!d, rj(-,cviAod Ill, 0 1, 1 A C .3 n 1 11 1 11C, MJ) � by ado i ing C."hSt,'i f'�.(;Zgtjr)jj C) L. MU] tiL newly ltrineiiced pi-operty, to be voiled -Fanvily ReFAdential., low cortain i- t Y OPIll') mo t i o I I C " I V. 1, i e el Cou Jj I;L;(,I) tj virl (50cond-'-d by Cmiricilmaij Wizitel-ij I;Q ptair; nc ilm wi I 'll Inn 11 C, (I 4i gr� b rd.J. tvan c o #10 wn e "1 (3 11 L", 11 r� 0 L" f I /'c 11 i 11 J'r "a jj , L f:j 1�; 'N t r) 1) "Q r. C; o r t�,) j 1) pro 1) o 1, Y I i u %q 1. y Fj rl 1-1 e X.I.- J , tO bo": Y.011ed -:-F;Jmily� 6,000 `0LiIT.i3OPJ RDJARDING AME'l IET.U-), HEARING ON ADOPTION 01' PiMINING WIVI-I'SION RE, DES I G BOARD PROGEDITPES AND CRITERIA Wal s , -d bad me t last night arid connented i;hat tile Design Bl�ai City Plailliel: , Jor �Li , I thai, ho' was very plerit3ed at hnw t1le F� -ird is furictioning so far. - Co 11 Yin i d tilat -evjewr�d the propocled ordinance Zvi it was acceptable Gelle-rt r;aid that 'ne Ila,` i to hi:n. Mr. LaTovrell 7,aid Itriat 'it, i,;Id lj,� Enard vv--lild con(ur. aring i.s wa:-I an ortJ4 rj 1 .6 i aild viaf� op,,,ned. 11r. Paul ROY 010uj�ht B Lriance to, con, , dc p ay Starr thought the n��view process would delny rrlafl�[,:. war; not in fe'vo I., Cf j. t . J, pro i6ct:�; and j ricrease CQStl� Mr. YI(;COtljI�,,Ali 0 1-c�Irl"'irkud that Ine bel i ill more -atl iel than controlling dc-Aeii. Jim Mueller tztaled th6t ile indiviclual des-ign x ! -C tjLj nks people appreciate what Edmonds would like to speak for tile or linance as h6 -it i to d ond was and is, antl that thfij, have R right to have a voice ill whL -appens E rn 0 id not believe in doAgn control. Mr. Morris art -in comrnente,! th"JLL�jp Vr. Jji :r. Y, -ovi ew f rocedurc would take Ba,� said tliat' he was concerned about how long the r 1) Follow; rig comment s from thL�,- a,ld-1 ence, the h�,ari ng was cloced. -t an(i :iecor,dt i 1, A rroti,on wa.-, ina6e I.%,, Councilrn-ui G,011ei .1"'IL V L -W 'by to a"d t "' l e Ai"JerIlLtj Q;1 OP hIly 1)U ll�!, or, f 01 t,;Cj?rlr)rjrjj� j Ile, ::1i IlL7"I fl,:!, i I y r�-ti ;,d,;llt j L"t dw�! I 1 1 m!.1 11 prQ1- rep isi t e to L ljt� i t;s, ia nC k,' Of b 1131.1 i Id ink Ft-- L Ull t b1l d, C I el5ti.111' E4 ii--�w cli-,jptor 112 .20 r -ion of Plarminv� Comm, �5sion Reso I u t Lo n 1/397. iii, the Edmonds Ci ty Gode in tiodi ficaf. mon,� discul..'sion foll.owed. A voll call. vo�.�? j-eskil I,!d in Wpili:,K, Gell,�vt 11hippen IT s"; and Nelson, NovdquTst a -lid Winters v ting "ilo' and Andernon voting "p. 01' RE-1JEF To �-IOAT WFI!, IINU. AND DEUElY LHYL)A 1,�i;GARDITIC, BUTIDI 1 -r, -,It he "J� 0 aj�e building Bi 11 ELa�t owivir of iloil t� joft Ltic . stated t)'j, 'j ,ite 'IL 6 1;0 1' fron; th". Council the,ground ruady to be. pi�' up ula th;,' hf- wu�ld lAkc potrt,i�,�3 o proce-20 on the i r� ') f' PILanp, thaL li�lvv alrea(3y bo(�n apjjrov,�d b.1 Ue 131A ing� -Department . PIWIller Wal, Ij s r3howerl sl :i des. of thn r.xiF.;tjng nLYL-Octure oil 0 p �Bo.,it fot't propr-l-Ly. Thr, propoe.od StroctLWO ill to 11(� L r:alrie ond with what s alreody i� �i c� n:, . A rnotion was made by C(lurin.i.1mori Winters and r3e��dhded -hoir pe rmit by Councilman Nelson to allow Boat ioft. go ah:t,�ad with i. witho . ut any morc d,�I, iy. . Motion cal-ried. Id -ig t( -r, o J' t!) u ri C! i and �)ewey Leyda ph�Ao�,rapl,s cf h. bu explained what hf, int, elided to do. A rrio ti on was IllIdu by Coi�ncilman flelrion and... d seconded by C Dewe.-I Ley a" a. ouhcilmon N'or6quLi3L to accept tht I gn o n QXOMpt II.IfIlL frof(I J;)I(' lljQj:,atnrJuni contingent upon his the I'luildinG Department. reqlli . rernorit.,3. Motion car,ried. t 3 -ntle,,.,i;,Li rejjlvt�uiil, i.ng th" Tu,.-key which is e on Hi gLvav C49 A g( trple C ty 0 -?d tbat lie had submi t ted plwi�� to 3 Fdmo rid.0 adjacent to Docieo. sta, some four mont�,L-j ago and th(,,,- had been approliud. Ki rljajol� C,.C)jLlCk;f�jj a, ni)nient: m for e bu3ineso- The �31gri will its design, etr. i,mrj di:,;ruz,,,vA &t; length. s a s i Councilman wintoru mavcd, --,Oconded by Councilman Anderson to ;-,nant' relief to Tv rk e y House from the irnratoriiim. ., Yollo,.,!ing more discussion, ti,e motion ca� ried. SQr;OrjjU(j l)y Cou e Counci iman Winters made a mdjon, �,Or; tC) Ro"I to Com'j- before, couricil at tile next, Inc!eting to sf�ek velief op-j 11fr! Notion carried. Gouncilm,--ui Gellert voted "no". E, D M 0 N D'; CIL ME E I I N G MINUTES JANUARY 29, 1974 -6- MUSSION ON BOAT� L6f- I 4C. Bill Ka r r , owner o f Boat Loft, 1ric. on Admi ra I Way had written Mayor and Council to re(Idest,exclusion 11ruiii the moratorium placed by council on building perinit applica:- tjons. He staUd that he recognized the legality of the situation,, but had (6,' specific problem and asked for- rel ief.. There, followed discu-�sion, on the type f structure which Mr. Karr was planning to erectj and that it was*indefd in keeping with �the surrounding area, being exactly the same as the.one already there oil the property,' and to be placed in back of the present building. dVi';ed tila t h. grant air 'if was the only:hody w ;ch could City Attorney Wallace a ouoc :exceptlon to the moratorium. Councilman NQlson suggested that Boat Loft, Inc. suhinit drawings, etc. and plans 'to the City Clerk before Friday so that couric i I �ts and use could receive thein in the mailing of the council packL -this for gui.de -quest for exception next week. 'If Mr.., Karr does i nes in order to decide on the rc s moved by this, council will give him art answer at the next meetinq It wa COUnc i I (naii N,,,Isori, seconded by Councilman Anderson that Boat LoLtjn.�.. tL(I �to brir1L±1n their desi(jr] lans to �,Ubmit to the Cit Clerk rior to lrid�i in order _p— J�L a t LC;un( i'l mefler-., till (Ti v e cri for stugy n foEeKEO I —El __�rid cort., iiD,, and that the' saine af)[)Iy to Oewey Ln da if fie wi 11 also 5ubinit his platis for review I j , tjFor�i ni!x t, wf�elv Tho. motion carried. I ON ()kU I NANCL RL V I f"W 01' PROPO I'l) Ul�l) I V I John Wallace advised council that this must be, reviewed by' the s ta te for �Attbrne� conformity before COUnCil PaSSaYC-. He thercfUre suggested tha t they rev i ew �Lh —e P -o 0 ? spd ordinance for, in ' out at the meeting next Tuesda and following this the. —Ee sent to the -state. proposed ordinance wiTT APPOINTMENT TO ROARD Of' APPEALS Ho rri sort it( a i n Ili acco th(, name of Wadc J wiiis f-cir appo i it tinen t to Oic 8 1 r of 7 May o t oi d Appea I s . Counci Irian Nelson asked that his motion. to delay be brought back to ouncil for action oil his original motion to confirm the appointment. Counci lwortian ­1:hippi,%n said ;he had a qui,,-.tion on the Sai I Intl Tavern.p6rkirif ' no I. bv IOg, a if juate ii nd w i s hed t o h,i vl� My'. lairto roiiqiii�,n t o it th i % a 5� , o n t lie It;, r k I tiq s pa rf:,s fo r -e t. -id leasi!d the Pxtr;i 'needed the building on Main Strc Mr. James answered that tie ' h, s -J(,( on Main Stres�t froin flock; that it was a 5 year I ea s e � Courici linan" Wc I I ing _lie t'j);j t -ked what flopp,all", to Ow iii"tor Ov., five yl�,rirs. Mr, Jaiw�, an I (I t.fjj�fj 1)(" f o fr i rld W I I'lif �j 1w -xplaflloff w0fl rf,.d" rl lifill't'-f. of, th;i f, tile S pacf., F. I t, tile, '-';I i I I fill I a vfj� ro Wt! (-(� an. ov( Y,�, i on it Is p�i r t a d Oil, 4: i b/ -Harry Whitcutt stated that this was correizt., Couric *.I woman Shipperi Life,, ques ( i'oned Mr. James on flow It(- Would lean in regard to int , erpretation of'the.c.ity code. 14. e ;I 6,,.wvrod tha t he wou I d 1) roba bly tend to he Illore. I i bera I . tha n some I fill ll(,� ff� I t -ric It to ho i I (.Hi 11,j codq�, i � fo I ly for evcwyollo Hart ' Y, Wit i (.4.1 L t la t :V a f t.,� -solllo d I V 1`l,!r(:nc(1,. o F oil i rri oil he Cwc�en it fill cind Mi- ;aiiii,,s 1:P fl(lvfli-thf:� I c"S t I he wou I d be all exce I I eit t womber for the lioard o f Appea I s . nded at the last ftieOAnq Counc i I man NO ;oil theii as ked tha L it i 5 wo 1, 1 oji ,' madf? arid seco be ac ted upon. . Counci I ma if At derson a sked for the ques t ion and a roll call s howed Counc i I ma n Ne I son vo L i ng i n fa vor of. con f i rma t i on he four reinaining� members against., and the motion failed to carry. Court(: i I'man W(,, I I i vi�i no tod Lh,,j t.. he recogn i zed Wads Jilmr,,!i if,, a 11,1r. I wor Irld �.ljljs fari- :tial member of the communi ty, but that he h!*id, a vather .'I iberal a n d va, very lo,would honest about it, and that he felt a inember of., i s. board should be someone wi adhere to the rules as set forth. Mayor Harrison then offered the name of Earl Mort -is for appointment.to the 13(,iard. The Mayor s tated that Mr. Morri s had been a po rtner wi th Dan: Mi 11 e r for a number of Ifle work in this'area. 'He years and did considera, also rah an antique shop it, the� location.where the flower shop is now. Mr. Morris lives in north Edmonds. The re was council discussion, and,the opinion seemed� to :�e t ha t it woul'd be.of advant age -a) J� Prl - 4t"' Ski,' RECEIVED JUL 2 7 1973, ClTy OF EDMONOj *y . . ............ . j q A rl) Q1, %DATE RECEIVED _ . _ -? 7- IV % PERMIT EXPIRE., i6aP-7- e� 111lI11iI!l1IIIWI USE PERMIT CITY OF EDMONDS ZONE NUMBER CONSTRUCTION PERMIT APPLICATION JOB SUITEIAPT# ADDRESS Ay m 1,eA) /,, m4v OWNER NAME/NAME OF BUSINESS PLAT NAME/SLIBDIVI SION NO. LOT NO. LID NO. PZ) k---. -)� 0�_ LID FEE $ MAILING ADDRESS w PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approl"d '0 RW Ptin., d Flequl, 0 Pe-ft Req'd EXISTING — PROPOSED 0 Inspection Reciflred 0 SWewalk Required 0 CITY ZIP TELEPHONE Ci IT lboo fl� REQUIRED DEDICATION FT Underground Wiring reqijfred 0 NAME METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED ILI YES 0 NO 0 cr ui w t: ADDRESS REMARKS z z x OWNERICONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE 0 z U) CITY ZIP TELEPHONE NAME 110 ENGINEERING REVIEWED/DATE ADDRESS cc cr FIRE REVIEWED BY DATE w CITY Z77LEPHONE t- z m LL 0 L) VARIANCE OR CU SHORELINE OR ADFIff INSPEC O�ION RE D BOND POSTED SXAZI I IrIF: ICZIF N1 IKARrR h 4> - EXPIRAT77 CHECKEDBY 0`6 3, 0 YES 0 NO SEPA REVIEW SIGN AREA HEIGHT PROPERTY TAX 'ACCOUNT PARCEL NO. COMPLETE EXEMPT ALLOWED PROPOSED ALLOWED PROPOSED ILI I , EXP .;ij 0 NEW 0 RESIDENTIAL PLUMBING MECH LOT COVERAGE ALLOWED PROPOSED REQUIRED SETBACKS (FT.) FRONT SIDE REAR PROPOSED SETBACKS (FT.) FRONT UR SIDE REAR 0 Z_ ADDITION OMMERCIAL o COMPLIANCE OR WC z z CHANGE OF USE PARKING �OT AREA PLANNING REVIEWED By DATE REMODEL 0 APARTMENT 0 SIGN REO'D I PROVIDED MVR PAIR GRADING Cyr), (D FENCE S X FT) REMARKS DEMOLISH TANK OTHER o GARAGE C3 ROETAINING WALL RENEWAL CARPORT 'ERY 8 C, z (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: t- a 0L1 fy%bj�"i s+og,��e UzAdc CHECKED BY TYPEIOF CONSTRUCTION OCCUPANT GROUP NUMBER OF N BE,F OF UM LL I OWE NG 14 CRITICAL AREAS w SPECIAL INSPECTOR JAREA OCCUPANT LOAD o STORIES UNITS NUMBER REQUIRED[] YES DESCRIBE WORK TO BE DON REMARKS PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'D P -,-" A t1-CA-1 L 4 ej V-) r 0 v s / be— VALUATION FEE PLAN CHECK FEE L HEAT SOURCE GLAZING % LOT SLOPE BUILDING PLAN CHECK NO: VESTED DATE PLUMBING MECHANICAL THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t- BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC GRADING/FILL DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES. ETC.) WILL REQUIRE SEPARATE PERMISSION. SURCHARG-4 w PERMIT APPLICATION: 180 DAYS PERMIT LIMIT: I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS ENG. REVIEW FEES SEE BACK OF PINK PERMIT FOR MORE INFORMATION ENG. INSPECTION FEE APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS w ;N INTEREST, AGREES TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF I LANDSCAPING 2 EDMONDS. WASHINGTON, ITS OFFICIALS. EMPLOYEES. AND AGENTS FROM ANY AND INSPECTION FEE cc ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY 10 I RECEIPT x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE PLAN CHECK DEPOSIT 0 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REOUIREMENTOF ANYCITY ORDINANCE _j 0 NOR LIMIT IN ANYWAYTHE CITY'S ABILITY TO ENFORCE ANYORDINANCE PROVISION.- RECJIFf urel1v , 1 TOTAL AMOUNT DUE /40729 11�_ I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION APPLICATION APPROVAL GIVEN IS CORRECT. AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application is not a permit until signed by the CALL TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED Building Official or his/her Depidy: Find Fees are paid, and IN VIOLATION F H BOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt is Acknowlodged in space provided, WORKMEN'S COMPEN AT!q�SSURANCE AND RCW 18.27. 9610 ALS SIGNAITURE DATE '�04AGENT) SIGNATURE (OVnNE DATE SIGNE9 (425) 771-0220 DATE" RELEASED BY ATTENTION' EXT/333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL 771-0221 A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- ORIGINAL F71LE YELLOW - INSPECTOR CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 FAX PINK - OWNER GOLD - ASSESSOR