Loading...
503 6TH AVE S.PDF111111111111 5425 503 6TH AVE S ED ion Edmonds Pla nning Divis Notice of Decision December 29, 20 10 The City has approved a "reasonable accommodation" request on behalf of Samuel and Goldy Marsh for their property at 503 — 6h Avenue South, Unit 3 (File STF20100025). The Marsh's have requested an exception from the minimum required 10-foot side setback and from the maximum allowed 45 percent lot coverage applicable to the Multiple -Family Residential, RM-1.5, zone in order to construct an 8 foot by 8 foot landing at the entrance to their condominium unit (on the southern side of the building) with a 27 foot long ramp extending west from the landing, as depicted in the site plan printed on the back of this notice. In order to allow the ramp and landing to be in the setback and to cause the lot coverage for the site to exceed 45 percent, the Marsh's are seeking reasonable accommodation from the strict application of the Edmonds Community Development Code (ECDC). ECDC Chapter 17.05 was enacted to authorize staff, when necessary, to reasonably accommodate the statutory rights of the disabled under the Americans with Disabilities Act, the Fair Housing Act or the Washington Law Against Discrimination. The purpose of the proposed ramp and landing is to provide wheelchair and emergency access. As part of the approval process, the applicant is required to file a covenant with the Snohomish County Auditor's Office that contains specific conditions; for example, the accommodation is personal to the owner and does not run with the land, so when the owner no longer resides at the residence or is no longer in need of the ramp and landing, the ramp and landing shall be removed to meet the underlying zoning code by obtaining a demolition permit. Section 17.05.020(C) of the ECDC requires public notice of a decision on a reasonable accommodation request to be sent to all property owners within 300 feet of the subject site. Pursuant to ECDC 17.05.050, a reasonable accommodation is not an administratively appealab * le decision. Interested persons — that is, persons located within 300 feet of the building site — may appeal the reasonable accommodation by filing a petition for review with Snohomish County Superior Court within 10 days of the date of mailing of the written notice of decision. This letter serves as the written notice of decision. The file (STF20100025) is available for review in the Planning Division, located on the second floor of City Hall. If you have any questions, please contact me at your convenience. Sincerely, Jeri Machuga Planner Development Services Department 121 5th Avenue North, Edmonds WA 98020 machuga@ci.edmonds.wa.us 1425.771.0220 CC: City of Edmonds Street File Property owners and residents within 300' of the subject site Samuel and Goldy Marsh John Elkins, Chermak Construction Inc. City of Edmonds (-Q Planning Division DEC 2010 WCES 25'. .76 19, - - -- - -- 10343, oump; E Is BACK ONE PliCYCLE 16g.rog(a AKEA - 6'FENCE 8' :14- lop 4- �3 @ 7,� 55TOACK LINE -7 t 72— ONF�AYVWFIC' . . . . . . . . . . . . . . . . . ASPHAL Y! < r" c- I MAN 4,c KOCK 9A lee VERHXNG' - --- - - - - - - - - ---------- - - - - - - --- 109.. c U2 ------ J., (07 7P4 6' CE AK FENCE�� A 4- tU- 1 0' 15' 13 6' 19, OL V\ cl. I PLANNING DATA STREE New Commercial I Multi -Family Projects Naf"e.- Date: la4z.140 Site Address: 15M0 CQ + � "V . SIP Plan Check #: BLD - a0to I 091M Project Description: o�neeA6�r- -0�� r,--Nv _aInd 91 6/v 6.1d,10. Use(s) Proposed: NO C e R � a =mq, �,- I ) Allowed Use: JIVD NO) CUP File Number: rdA To Allow What Uses: AI�A Legal Nonconforming Land Use Determination Issued: (YES llliN> Reduced Site Plan Provided: ONO) Zoning: R M - 1. '157 Map Page: Comp Plan Designation: NO) 0- P-u.:%N Corner Lot: (SP QX64 4-Ade-S CIP 1A Flag Lot: (YES I tag? ADB File Number (date waived): /.A Lot Area: NO Plans Match ADB Approved: (YES / NO) A11A Shoreline Required: (YES 140—D Critical Areas Determination #: C-VA ao1C)010G El Study Required 0 Waiver SEPA Determination: Exempt El Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). Required.Sethacks w Fc, Street: 6 1 Side- 10 / I E I /I Actualsetbacks Street: e, P� 60 10 + Side: < Re 1,QAre-e-V. (E) �Lot �Coverage FAR Required: FAR Pr� nier- L** A,ce-b. 7 ;Z00 _r+ Lot Coverage/FAR Calculations: (x% Uf proveAf L& n cler LJ�J + . . . . . ..... ..... Hei�rtft Datum Point: At ' Datum Elevation: y ZA Maximum Height: I - Actual Height: Subdivision: IS Lot Aggregation R equired: Landscaping Landscap ing Matches ADB Approved- Landscaping Bid Provided: (YES I 42�1 NMI Am'_ourn�l 0% Bid): WA 1) yt:?32.V1 . FT. 11N loved. Plan Review By: 04m , so-Mme-ro _s;de 4o PLANNING DATA =FILE New Commercial I Multi -Family Projects CommercialParkingAnalysis Business Name Type/ . Use Parking k�ttio'- Tenant Area Required Parking totai Parking Required. PJ/A Total Parking Pro vided. NIA Multi -Family Pa rkingAna # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1.21D.U. I Bedroom 1.51D.U. 2 Bedrooms 1.81D.U. 3 + Bedrooms 2.0/D.U. all Tot.11 Parking Required: �T otal Pqrking Provided. Omer - lle� an'Revi6�' I! Y� Monday, December 13, 2010 To: City of Edmonds, Planning Division 121-5 th Avenue North Edmonds, WA 98020 From: Chermak Construction Inc. Jon Elkins 655 Edmonds Way Edmonds, WA 98020 Re: Sam and Goldy Marsh 5036 th Ave S. #3 Edmonds, WA 98020 To Whom It May Concern: The Marsh's have contracted with Chermak Construction to build an access ramp for Sam. As you can see from the attached doctor's letter, Sam is in immediate need of a ramp so he is able to safely come and go from his home by wheelchair. On at least one occasion, the emergency aid professionals have had to get him outside the building before being able to place him on the stretcher for transport to the hospital. The Marsh's are asking for "Reasonable Accommodations" as described in the ECDC Chapter 17.05. This is for an exception on multifamily residential Code 16.30.030 for side setback of 10 feet and for lot coverage of 45%. Sam needs a 8'x8' landing at the top of the ramp to be able to negotiate a stretcher out the main door in times of an. emergency and a 27' long ramp running along the building to have the proper 1 in 12 ratio for his wheelchair. At the farthest point, the ramp and landing would protrude no more the 8' into the setback. The Marsh's have be made aware that when the use of the ramp is no longer need, whether through moving or Sam's death, the ramp will need to be removed and brought back into compliance within six months of sale of residence at their expense. This would also include the removal and replacement of needed landscaping (purchase or transplanting) to be brought back to original layout. Anything that can be done to expedite the process would be greatly appreciated by the Mash Family. Ily, Oone (425) 776-1367 cell (253) 335-1277 A&I (425) 776-1367 -FAX (425) 774-4993 M 655 Edmonds Way MEMBE Edmonds, WA 98020 - CHERM C1 11 ONU RECEIVED DEC 13 20-10 DEVEDPMW SBWM C-M MY OF GMNDS U 0% REET FILE www.chermak.com LM...Medicine NEIGHBORHOOD .CLINICS 11/19/2010 City of Edmonds Re: Samuel E Marsh 503:tth AV6: & Unit 3' Edmonds WA 98020-3473 To Whom It May Concern: Mr. Marsh is disabled from a chronic illness and needs a wheelchair ramp to access his condominium. In addition an 8'X 8'deck at the door is necessary to allow the use of a stretcher if necessary. If you have any questions, please contact me. Yours truly, Thomas E Phillips, MD UWP Shoreline Clinic �" - !�i 5�� - S-4 S-41 December4,2010 Sam and Goldle Marsh 503 61h- Ave, South #3 Edmonds, WA. 98020 RE: Ramp leading to south condo entrance Dear Sam and Goldie, The members of the Association agree to the construction of the entrance ramp. There are four provisions for the construction: access to the building from the east side of the platform; compliance with all codes and regulations in construction and in removal of the ramp when no longer a responsibilitV of the Association; provide copies of permits needed; ramp construction expense Is not and covenants. Since Michael Brow ield CC: Bobble Loughrin Mark Pereboom Linda Brownfield Ob August 29, 1979 MEMO TO: Art Housler,,Director Finance Department FROM: Fred F. Herzber .Director of Public Works SUBJECT: REIMBURSEMENT OF STREET CUT SECURITY DEPOSIT ORDINANCE #1935 R/W CONSTR. PERMIT NO.: 79-144 DATE ISSUED. 3/13r7-9 LOCATION OF WORK: '503 6th Ave.-Sb. SECURITY DEPOSIT AMOUNT: - RECEIPT NO. & DATE: #0037 3/22�79 COMPLETION DT. OF REPAIR: 7/17/79 oo3l 312 -), Please prepare I a Treasurer's Check in the amount of $ 21.00 made payable to the following: Russ Johnson 16009 No. Meadowdale Rd. Edmonds, Washington 98020 The balance of the deposit in the amount of $ 102.00 is to remain in Street Division Revenue Fund 111-000-000-3MY710. lv lill�l��7 CITY OF EDMONDS 14FW PUBLIC WORKS DEPARTMENT RIGHT - OF - WAY CONSTRUCTION PERTT , V/ A. *Address or vicinity of Construction 0 Owner: InAXIIIA'd / "" IT�_- Name Mailing Address City, State, Zip Code FRi t No. Issue Date 0 Permit Issued T�: 0 Type of Work to be Done: 9 Work in Connection With: El Sub or Plat Q�� I I .Single Family 11 Comml. / Ind. El Apt. Condo,!. 9 Pavement Cut: 0 Yes El No 1-1-7) - T� A, e Contractor: A-1 r \ K/ L" - ame r /I s,U Mailing Address State License Number C7 3� Z I - Ci-t-y, 'Z I p C oLd' e- Te(ep`h�_ne Num-be'r NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE B. APPLICANT TO READ AND SIGN INDEMITY: Applicant understands and by his signature to this applieatlofY, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of it's departments or employees, including or not limited to the defense of any legal I rney fees by reason of granting this permit. proceedings including defense, costs, court costs, and atto 0 0 U W Upon issuance. of this perfrilt,7-the -,contractor is --responsible -for workmanship and materials for a period of one year ca following the final inspection and acceptance of the restoration by the Engineering Division. 0 Funds held from the Security. Deposit (estimated restoration fee) will be held until the final street patch is completed, at which time a debit or credit will be processed for issuance to the applicant. Work is to be inspected. Restoration to be in accordance with City Code. Traffic Control to be in accordance with Traffic Section of City Code. Street to be, kept elean at all times. A 24 - hour notice is required for inspection by Engineering. Call 775-2525', extension 220. I understand that this permit must be available at the job site for inspection purposes at all times. S lfynature: Date or 0 gent THIS PERMIT MUST BE POSTED AT THE JOB SIT. FOR INSPECTION PURPOSES CALL DIAL - DIG PRIOR TO BEGINNING WORK Z �D 0 C. Issued By: > I-- 42E �i�_ i7 Time Authorized: Void after days Special Conclitions, R 1^ L a Ammendments:\ Permit Fee: Security Deposit: 'Recelpt No.: Fund I'l I Fee: Street Cut Dimensions Q X * * NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE * * Eng. Div. December 1978 FIELD INSPECTIO�-J�ES (Fund 111 -11qwOute con.v to Street iDez)t*. Comme !i—t CeP. Diagram: N Contractor called for inspection Yes I ,,%Iork Disa.T.3proved By: Date: Work Approved By: -Date: Inspector: ­ (1-11) Bv: Date: Eng. Div. December 1978 Side Sewer Drawing r r-.J -1 I he City o 111will b EASEMENT NO . ................................ ........... NEW CONSTRUCTION REPAIRS LID NO . .................. ASMT. NO . .................. OWNER --ML�4L-CA-A ...... ------------------------ CONTRACTOR ---- V- � ......... --- .............. PERMIT NO. JOB ADDRESS ... . . <�� ..... I —lz 5 . . ................ LEGAL DESCRIPTION: LOT NO - ------------------- .................. BLOCK NO - ------------------------------------ a? PWW-0001.1 1175 (REVA 1178) DATE .... ...... B 7, ---------------------------------- 9 CITY OF EDMONDS PtBLIC WORKS DEPAR FOR INSPECTION CALL 4-%Permit INTIP 0 16) 0, 0 775-2525 Ext. 220 Issue Date SIDE SEWER PERMIT PERMIT MUST BE POSTED ON JOB SITE 1. Address onstruction 4, /)OK �-)r) 2. Property Legal Description (include all. easements) 3. Single Family Residence L­�Multi-Family No. of Units Commercial 4. Owner and/or Builder H 5. Contractor & License No. '/i' -!3 _�7 6. Invasion into City Right-o'f-Way: No Yes (If Yes Right-of- way Construction Permit Required Call Dial Dig (342-5344) before excavation). 7. Cross other private property: Yes No L--�'Easement required - attach legal description and county easement number. READ THE FOLIOWI,.NG AND SIGN: a. Property owners must obtain a permit to install side sewers on their property. A licensed side sewer contractor must be employed to construct side sewers in the public' right-of-way. b. The side sewer contractor assumes full reponsibility for each installation for one year. I C. Commercial establishment requires a minimum of a six inch (6") side sewer line. d. Side sewers may not be installed closer than thirty inches (30") to any structure. e. Side sewer lines must be laid at a minimum grade. of 2% (1.150) and maximum grade of 100% (450). 0 f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed between cleanout. All 90 turns must be constructed of a 45 (1/8 bend) and wye with removable cap. g. No down spouts, footing drains or floor drains can be connected to side sewer system. h. Pea gravel is required for bedding when installing sewer lines through other than granular soil. i. Cleanouts are required at 30"-60" from each plumbing exit line and at minimum intervals of 100' along sewer line run. j. Trenches within City right-of-way must be restored to original conditions. Contractors shall be responsible for right-of-way failure due to poor compaction of fill. k. Side sewer must be left uncovered until inspected and approved by the City' y 1. Inspection during normal working h/ouronly. Two (2) working days notice required. 12 DATE: jr�`certify tRat I -have read and shall comply With the above PERMIT FEE: DISAPPROVED BY: Date: 0 By: Date: CONNECTION FEE: 94 APPROVED By.:. Date: 0 PN * PERMIT MUST BE POSTED ON JOB SITE P. jil 111110iii;- hw 0 ate, OF, !TV % R easements) — ---------- 0. Z3 'm . -.1 __. M' iti-Familv of Ur #A N 'o f - (if Yes Ri t 0 ty. Ri 91h Ye way Iction Permit aqua ad call ia (342-51 e ore,,- exc, vW- - V�. 3f-me" c) rj,"- r t, Ye s v No t vi re 1, 4 L 4, CunV c'c- c, y, j,,-� 'o-yi al-1, EA m U) "L!, ;�,777,! i.!_-Nij CL 0. p A pea.-mit t o 11. side- sewer Zn, -CO) b ta a the, _t proz�.,e:r !Acen:FcJ s.Lde sawer cont�rac4_-c CO t) 1C. ru c 4- _TrtU3t be emy)laymd (D -:3 di s e-�- rz e p7�hl __L4 right-o f M 0, e SeW(--:r CO-n'­.�acto.r ssumts Th t�., r-U' 0 4 11 ty I rg-. - -�r one year. ei '71 at -OMIZUE! C I a. S t a b 11 s h --m e n t -0 quires a T n n urr, 7 -.1i 1. X Side sewer Ifor 9� 0. d-. S _J de se��'%'er3 --may. c.-,t sto e cicse > -1I �d r. t h la z') t to S t r fac U_rc criV s e s,­w e nes mius; i- R I' d, at 'a I Aln.ul m 91'a= .15" 0 Of 10(31�; 0 t,-_4 S I C10 s g.,w r a. r e a t e than 45 3 k 1/8 k erid) :isc,�_Ll wc- > and -wye wj_ A -turns c On. t r u. 7!1C e- d o a :4 5 -th ri,: z 9- No c-�,wn sp t s ins f loor 0' dra, S be- colme SiGe sever :can: p a V e 4 recr f W.,Lr c,_- n, n 4 c, t1h S.0, e r r e Lj 6 0 rom required at ne renc � _k_ I I Ong, s eWer:- line run and a-i- Miln4 milm a 1 s of Ont - T hes lv-ith-L7� City r*i,ght Of -,Way e, nes, t 01 e'. a- i t C) r. i 4.. 4 condi tic)4,js ib r f '-W m %-om- racto,17 S SIU be-xe--ponsi, ie�f to.poor, -1 . � 1 0 du ei,* o f I on of 1 e f.4- seWer m ul s t be ulncove--red unt;� z "A k` 1nspc!_-tO_d 4,mel M d by. tht--,-'Ci- p I-P ro -nSpection d,,.�ring narririal:­"�:w6i�i-n L 0 -ay.-§ "m 6 t J. ce O-S�,�044Y-_* 2)' required. ii DATE: > ti ve. r c�-R8­ f7;. 77 an-d J -1 tl_�z A Y VIC C M_T$Z W C M A 1 M 9 ZWO 'T 1.4 q ju. -1101.7E- L__ A` - f, IT"r FIE I ON L -APPROVE Da. F T:)E RMII;" T` SLI eA APPUCA710H lh* city a &w" for EASEMENT NO. --------------------------------------- SIDE SEWER PBMff NEW cONSTRUCTION El REPAIRS LID NO. — ---------- --.-ASMT. NO - ------------------ A� R ------- -CONTRACTOR-, ------------------ ..................... ----------------------- PERMIT - ------- ............ OWNE ........ ..................................... 7 ------------------------------------------ - LEGAL DESCRIPTION: LOT NO. .......... -- ....... BLOCK NO - ------------------------------------ JOB ADDRESS - -------------- --------------------------------------------------------------------- --------------------------------------------------------------------------------------------- NAMEOF ADDITION ------------------------------------------------------------------------------ m ---------------------------------------- �411 Approved: -7 �4-q- -5 DATE --- � *- -6- - Z5.. By .. . .. ..................... �j illy, U30 MIC _M14%117V1r_ MIMUIF-Y: Up, o", --TERMIT" Y dail '775 252.5. for slde� sewer Anspection's*, BEEORE�.1c'overing.- a;y porti _pn,, of !h,e__�on'stru_�tlRq- �24 h No nspection wlllVtbe our Sun-.',�or holiday. Inspectio 4". ........... ................................................................... 501: SiYth. Av�mue AMDRES&.,L0CA170X* OF'CONSTR 10 ...................................... UCT N .............. A PROPERTY ILEGAL DESCRIP116 ................... .................. :..; .................................................... ........ .......... ................ ........ ................ .... ...................... .................................................... .............. .......... ......................................... ..................................... ............. I ..................................... -ER AND/OK-BUILDER ............................... ........ -BOF N91-, -N SE .......... ---- ................... ................... ............. DR SS..'JIMM .... ................. ... .. ...... . .. . . . . . . . . . . . . . . . ....... ........... of -a-side­,sewer to' �'the�.Clt sa­-n1iaiy*i-!iilqwer,J Y. --amim a6bordance;w1thi,:Citv, of; Edrno'nd� ord[n ne6s: Y� 'LF TIOMAS;C,�L b-..TO,'THE- FOLLOWING: rtlow of 0 mu No.,J=�The�,owners, *df� -the �pr6perty- may obtain,a,per t to�,construct sewer� Inslde.,'*pro,pert'yAIne!. 'A!-:lice'ns6d-'SJde C'ntraclo�,, `s�,be, ye mi ­�sldie' sewer In, strcet,areal. 'Do,tiot 6verrariy,po sewer before: it- bas�,been.'lnspictedl empio 'All.work; performed. in,,city -right-of wa, r q6tres alf-4rivaosion-of Right -6ii�Wiy� iernilt jobta,,..6i�'Ifr� -th*e'-C,ity. Enjineer's -office., - No. 2 e Y '. I _1 .. ­1.1.- 11 :'NOTE .,No1'�3L-obWn­fulI ifnforrrla�don rekax�ing. Ordinance! 11.16:03 "i d O.,an .�Regulations. n..,you,get' permlt..­ NOTE' NK'4t�Top-o f side sewer.',must have at I east 30 1�6h is,!'cove rage -at -property., line.. d, I2Anches,:inside',' pfoperty line;:-:mInlmurn,jrad d- harpertharf 1h: will-, It e-*of:2,0�_.,No;sben sfAnl4grade., be'periri ed: '-'NOTE 'No'.',5--Trench6s'I*n, str�et,m t be;water:settled.md, surf a �oif Istreet;-r'estore, 'Le dt ttl�-,drigi�Al,,!,�oridltion , 1.,.-'Contraetors shall be r&qponsibW for- fall6re..'aue :to:'Jmpr66er'! .,-,.yo.rk,:wh ich-.maX� develop within one �year.,of:completlon. NOTEY No 6;'. doaany, other work than,4', �rovlded4o�:Ilni­th�-pc any 7prk 'on, th maln'?sewer'or Its.4purtenanciiii' _�pt�joi.'Jn-' c qxce �.ert,the.-Pipe;,into'the�wye:. DISAPPROVED- M� Dale. ....... Da .. ... ..... 'By..: ........... Date .......................... ........ Br ............... APPE OV .. ... ..... ................................ ......... By P Remarks: ... ............ X ....... ....... ................ ............... ............. ............ ............................................................................... . Y %; ................. ............. ............................ .................. ................ .............. 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . ... . . . . . . . . . . . . . . . . . . . . 6f,.-Fir' ix�i 'C' ,,J�,�ST.Be S.i'gried By� OWn&r 1. in Per-fb ng-, bristructi6n. PRI-OR To equest.-Fjor-Inspec ion: t ................................... Zont_ ................... ....... ........ ere y :dertif�-,that,t e side,.sew.er ins talldtiom. constructed underthis'v'por'rnit- (Owner, of ting Firm Performinj Co�struetlo�)' 'C m�r.&s-,Instaled� in 4c�Qrd&nqe;-'With%,'a1 gpvernirig,',ordi'lib�Ild6g,",c;f,-,the ity 6f:Ediiibnds.,�*, .......... Dated this ....... ..... . .............................. ......... W t Ga' Check�BEF a or, p , s ok�:Yo,�41i; or:,. 'Tele�'phone.�E),,. 'Power SeWer"': .0t or,**[-]: h % APPLICATION for --vy of Edmonds SIDE SEWIM pMMT 104-07600 NEW CONSTRUCTION 0 REPAMS 0 EASEMENT No . .......................................... owNER ........... fsen ............................................................................. CONTRACTOR -------------------------------------------------------------------------------------------------- PERMIT No . ...................... ADDRESS ..... -50 .. !!� .. fith --- Avenue-s .. ................................................ LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ NAME OF ADDITION DYE TESTED ON SEWER JULY, 1972 Approved: DATE................................................ By— ---------------------------------------------------------------- _ APPUCATION Ir of Edmonds for EASEMENT NO. ------------------------------------- SIDE SEWER PERMff NEV CONSTRUCTION E] REPAIRSx LID NO . ........... ------ - ASMT- NO. --- ------------- OWNER ------------------------------------- CONTRACTOR 7k-lX--/A'--l'l--,�!,--' . ............... PERMIT NO.6-1-7� oz is, LEGAL DESCRIPTION: LOT NO. --------------------------------- -- BLOCK NO - ----------------------- JOB ADDRESS ----- ----- -------------- .................................................................................................................................................................. NAMEOF ADDITION ----------------------------------------------------------------------------------------------------------------------- Approved: DATE-------------------- BY------------------------------------------------------------ 77 --iL 4 -!3 42 - 0 9 -3 - be) - 000 _--� RI'Ll."L; V-' I VE D APR PERMIT COUNTER 4. The land refer red to in this Policy is described as follows: Lots 1, 2, 3, and 4, Block 93, CitY of Edmonds, according to the plat thereof recorded in Volume 2 O-f Plats, County, Washington; page 39, in Snohomish EXCEP'jr' the north 50 feet of said Lots 1, 2, 3, and 4. (ALS:­ KNOWN AS Lot 2 Of Ci*tY of Edmonds Short Plat #S-57-78, recc.-:ded under Rec ording Number 7904130193.) a a PERMIT APPLICATION REQUIREMENTS TO: Permit Coordinator, Building Division FROM- Lyle SMan, Engineering Inspector OWNER: wy I, X-- PLAN CK #_Zq .ADDRESS:- DATE: After review of the subject permit application, the following requirements mustbe met. 1. Construction hours are: WEEKDAYS .......... 7:00 A.M.-10:00 P.M. WEEKENDS/HOLIDAYS ..... 10:00 A.M.-6:00 P.M. 2. A separate RIGHT-OF-WAY- Construction Permit is required for all work on Publicproperty. (ECDC 18.60) 3 . Truck haul rouW plan must be submitted and approved prior to permit issuance. 4. Builder/Owner is responsible for containing all temporary runoff and erosion control on site. (ECDC 18.30.030d) S' NO WORK SHALL BE DONE WI7WN IS FEET OF STRE,4MS OR .10 FEET FROMANY CLOSED DRAINAGE FACIL- ITY BUILDERIOWNER IS REPSONSIBLE FOR JDEN71Fy7NG COND17TONS ON ED 771 RAWING. (ECDC18.30.SOG) 6 FILTER FABRIC FENCE SHALL BE INSTALLED AND INSPECTED PRIOR TO CLEARING AND CONSTRUCTION (ECDC 18.30) 7. INSPECTIONS ARE REQUIRED ON STORM DRAINAGE SYSTEMS, TIGHTLINES, FOUNDATION DRAINS, AND CATCH BASIN INSTALLATION. INSPECTIONS ARE REQUIRED PRIOR TO BACKFILLING. (ECDC 18.30) 8. Repair or replace all defective existing curb, gutter, and sidewalk adjacent to the property. If an intersection is involved a handicap ramp may be required. Contractor shall meet with the City Engineering Staff to determine the extent of repair prior to issuance of the permit. (ECDC 18.90) 9. Driveway slope shall not exceed 14 % without a waiver. Every attempt should be made to keep the slope below 14 Waiver granted to (ECDC 18.80.060D) 10. Driveways must be paved from property line to City RIGHT-OF-WAY. A separate perimit is required. (ECDC 18.80.060C) I'- INSPECTIONS ARE REQUIRED ON DRIVEWAYS AND SIDEWALKS PRIOR TO AND AFTER POURING. (ECDC 18.30) 12. No burning of construction refuse without a permit from the Fire Department. 13. Connection to City water system is required. There is a separate charge for the water meter. (ECDC 7.30) 14. A back water valv e is required if downstairs plumbing is below the elevation of upstream manhole. (ECDC 7.20) 15. Water and sewer main lines should be separated by 10 feet minimum. (ECDC 18. 10) 16. Connection to the City sanitary system is required. A se Lrate pernut is LI 0= Lge D#:e FF Fees paid: Yes— , — (ECDC 18.10) 17. Underground wiring is required on all new construction; and for additions, alterations, and repairs that exceed 50 % of the' total assessed value of the structure. (ECDC 18.05.010) 18. A FINAL ENGINEERING INSPECTION IS REQUIRED PRIOR TO THE BUILDING DIVISION GRANTING OCCU. PANCY OF THE BUILDING OR STRUCTURE. (ECDC 18.90) 19. 20.AA9*PAZe- c;, Ot io's ^u-Ann au au MLU fA W coo Saco C4 04 -0 Tft .�;r- owur A A A C4 C4 C4 cu; I.D!w #T t F- TO& -�,ib 15 14MIf 10 UP t. 70 0104*4� e,-v. Fs 4&-'o R6-,Jltj< !C, 7%; 44-CL, _Z,Cejjej 6- 7't ar j;1j1�(,jjLjj' IP W,)Lo 44A,)C-, jk� jjtffp-- OL))P- '44,L- IP A-V�,:- TV V)AkIP (51T%� Oa iWF/ ZO.JTP-1-7- (7- , Z�/Jr elf STREET FILE OMH ge 100 I e 157 7� -�-Wm r4 NEW 6u A,:Pf OVFF-L.4Y Mom, maw .11,UICO NEW I 0 L.) .5, Nare: amove Ar Vw rf' HYP � WM iMH 100.10 1),II A i MH r- t - 9,5, -3 3 16,94, e,3 6 u e 13 #Z (fYF6 IA - �,U 176f�ll,) (CONNfZf (U. PeAl),J� ei ioo.4o O�� Lf, Iz $01F, le '10.40 (ALL) z z V7 0 0 I'vell lli�:O*l (fYFe lkt,66 IMAII,) :0 #4 -M.0% leg '141.10 —16.o I r Z0. I V le 10. 0.0 6y ( Ueo I,LY loz!z '15-7 " aL IOZ.f m6w e0ey-elty-k-1, "1015 a rll� - —104 Z4'0.,Mr ee e 1 —01 EL 101. Z EL 1101.11 OAOeMtNT 4AN) Fab �-- Raa"& !32 ST-i,7721EE7 FILE 7-CZT-Y OF EDMONDS " COMMUNITY SERVICES Date: 4 1Zz! Received of: rn�z--'Z- /"wZ,- 1 311P 74 4) L; Water Meter Size: Water Connection Sewer Permit/Repair Trunk Charge Sewer Connection/LID Fee R/W Construction Permit Street Restoration/Street Cut (620 Fund) Street Disruption Fee Eng. 2.2% Inspection Fee 6-v Eng. Specs. & Plans Storm Drainage Fee Street Use Permit Building Permit (Type) Plan Check Fee 3, State Surcharge (Fund 622) ZMg Applications (Type) Sh'd—reline Permits S.E.P.A. Review Recording Fee Maps/Books Photostatinq /--I� -,-e .7 � Ce"I*Ll� ) .25, ci zl-.' 7 C "-?, Tax Date of Hearing: By: Ti me: Permi t #: 6"' Mm 15. CITY OF EM CONSTRUCTION PERMI'F," 'P�bb_ I 101 J USE ZONr NUMBER OZ4� OB SUITE/APT o ADDRESS 1011MISR NAME/NAME OF BUSINESS on''P a LEGAL DESCRIPTION CHECK SUBDIVISION NO. 04 I LID NO 0 �AILIN�DD;ss -A Lk-1 - - PUBLIC RIGHT OF WAY PER OFFICIAL S REET MAP. EXISTING — REQUIRED DEDICATION ESCP TP A PROVED BY CITYt ZIP ry) TE11P1' 0 PROPOSE NAME RIGHT OF WAY CONSTRUCTION PERMIT REQUIRE STREET USE PERMIT REQUIRED 0 0. ADDRESS REVIEW BY Z SEE E 0 DATED i-coo, w CITY ZIP TELEPHONE NUMBER REMARKS -7 *+"IE_ _ ()n (,Ipn 017, 15 ADDRESS 10 10 Ab Avc. BUILDING E IFIXTURE UNITS - SI/Y I I Z R Z 8 CITY ZIP R�M IWOZL, I TELEPHONE NUMBtft T_77 -WK0 R7 .FTE LICENSE UM.E R I r1r)e_Me1IZJ4 SIGN AREA A LLOWED PROPOSED I ENV, REVIEW COMPLETE i EXEMPT AOB NO. 4317-qo SH /VI�E I Z 2 Legal Description of Property - include all easement (show below or attach two copies) N "_? I rL VARIANCE PLANNING REVIEW BY, -I<- DATE e4_3_9] SETBACKS FEET HEIGHT a REAR FRONT IDE 2;, LOT COVERAGE (4.5c;6 Z Tax Account Parcel No.4�42_- og? - coi -ono3 REMARKS NEW RESIDENTIAL PLUMBING F-1 ADDIALTER COMMERCIAL MECHANICAL El REPAIR jj�APT. BLDG. SIGN ldekiii, 2-- A_eaw 'osi'll EXCAVATE,FILL FENCE EJ DEMOLISH 13 OR GRADE x _FT) CARPORT REMODEL E] GARAGE CHECKED BY � 32 TYPE CONSTAUCTION CODE Z_,00oV I 1251-, HEIGHT/ t) SPECIAL INSPECTOR REQUIRED 0 YES 12 NO AREA -_ JOCCUPANCVF G A/R oc CUPANT LOAD Z IN OD STOVEI M RETAINING WALIJ �o INSERT . L_J ROCKERY RENEWAL REMARKS PROGRESS INSPECTIONS PER LIBC 305 0 (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: 0 ,d UMBEIR OF STORIES NUMILILER OF OWE N. UNITS NATURE OF WORK TO B"ONE (ATTACH PLOT tLAN) L FINAL INSPECTION REOUIRED 4wit, tr zotax y 6&ewy r #Iorr, j*E L I N FEE llmr PLAN CHECK FEE BUILDING JA www e26 0 cyas PLUMBING Plan Check No. MECHANICAL This Permit. covers work to be done on private property ONLY. GRADINGIFILL 32- Any construction on the public domain (curbs, sidewE-Iks, STATE SURCHARGE 12, AAV driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit Limit: .1 Year - Provided Work Is Started Within 160 Days "Applicant, on behalf of his or her spouse heirs, assigns and successors In Interest, agrees to lndemnlf�, defend and hold 44 ow 2 harmless the City of Edmonds, Washington, Its. officials, employeeg,.and agents from any and all claims for damages of whatever nature, arising directly or Indirectly from the Issuance of this permit. Issuance of this permit shall not be deemed to PLAN ECK DEPOSIT �H OX m odify, waive or'reduce any requirement of any city ordlnan a nor limit In any way the City's'ablilty to enforce any ofaInance provlslon.�' TOTAL AMOUNT DUE A Al. 4,0 I hereby acknowledge that I have read this application; that the Information given Is correct; -and that I am the owner, or1he duly ATTENTION APPLICATION APPROVAL authorized agent of the owner. I agree to comply with city and state laws regulating construction; and In doing the work,authoriz- ad thereby, no person will be employed In violation of the Labor. Code of the State of Washington rel tl to Workmen's Compensa- THIS PERMIT This application Is not a permit until AUTHORIZES ONLY THE signed by the Building Official or his WORK NOTED Deputy; and fees are paid, and receipt is tion lostmirrice. INSPECTION acknowledged in space provided. DEPARTMENT OR AGENTI DATE SIG�rf) I OFF191AL'S SIGNAIURE D TE CITY OF EDMONDS CALL FOR 'RELEASED BY: INSPECTION . A NTiOP( TTE IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 771-320 OR 2 ORIGINAL — File YELLOW — Inspector CHAPTER 3. i r 7161?1 PINK — Owner GOLD — Assessor STTREET FILE * S� 77 R X'--' �; "'i IV r'.' D DECLARATION OF RESTRICTIVE COVENANT APR.# - 1991 PERMIT COUNTER WHEREAS, -A �A ol are the owners of Y owing described real estate in the the oll g City of Edmonds, to wit:tC4� J,2 ' -3 a --d 4, 6loex- F-0ifrolki-C /1) �3170150avo�� 6ntl-o4�_' 104t!�. tr7l) -tZrA-, of' ' / - EXCelph 4, Poe_Ti-f 5D q��4 W--5c(;ol /oA's: 00aa a ?kk;t- et'j =;* 5 —57 '5��,-nqrd- Shoef (X4 6, CW_0 tknder —7947LI13,01,73.) WHEREAS, the above named owners arTdesirous of imposing a restrictive covenant upon said premises in compliance with Section 19.00.040 of the Edmonds Community Development Code. WITNESSETH: that for and in consideration of the premises, the above named owners do hereby declare and grant to the City of Edmonds as Grantee the following restrictive covenant, to -wit: That at the time of the execution of this Covenant the Grantors have agreed or the Ordinance of the City of Edmonds provide that no . build-�ng for multiple family housing may be ' . erecte . d on subject property containing more than Z/ units. DECLARATION OF RESTRICTIVE COVENENT - I �. 4 �' . I ­- - -, �'­' '_ . - ' . . . ............... I Said covenant shall be binding upon all present and future owners Of said real estate and their heirs, successors and assigns. DATED this STATE OF WASHINGTON) STATE OP WASHINGTON ....... ................ " )s COUNTY M. SNOHOMISH s .... ........... " ,7? day of I 9-L/ Grantor 11�c: X r On this 25 1h d Y of March in and for the —state a 19 91 of 0 —, before me the undersigned a Notary Public ry m. T duiY C01111nissioned and sworn, personally appeared Grego iasfirng on in and who executed L111 Pinnmn to be known to be the individual describ, Bethlyn J. Pinneo foregoing instru —Fo—rLmself and as the attorney in fact of and E Kged to me that gned and sealed the same as . also therein described sl deed and as the free and vol "L Bethlyn J. Pinneo untary act and deed of the said -L_isvoluntary act and and on :iii i i! for the uses and OULPOSes therein mentioned, is now living. 11: the power of attorney#authorizing the execution of this instrument WITNESS my hand and official seal hereto affixed the day and year in this certificate above written. MY commission expii�-S:` STATE OF WASHINGTON )ss COUNTY cip SNOHOMISH AVVLCIL-Y "uDlic in 4aryj f o grt h e::: is t a �—teo r Washington , residing at Lynnwooci On this 25th day of March in and for the --state of 1 9 91 .,.# before me the Undersigned a Notary Public appeared Washington duly Robin w Michel cOmfAissioned and Sworn Persollally toregoing instrument for him self and as in and who executL-.d the to 130 known to be the Individual describ,-� K:,aren E. Michel the attorney in fact of -Te also therein describW deed and as the free and vol--- signed and sealed the same as his Kar '' e n `14111! untary act and deed of the said luntary act and and on oa . ... .... ... Michel -ZZ=—VO s ated that the Power of attorney , for the uses is now living. ai''ii:1 Puri3oses L�h authorizi erein ng the expn"i-i er, tioned, WITNESS my hand above written. OffiCial seal hereV My commission ex pilr6�9�::-� 94,15 7.9 C ki" 01 this instrument affixed the day and year in this certificate N�iotary Public in anWcj for the S -----_�ashington Late of S-� , residing at Lynnwoof: -tiTY- OF EDMONDS 'COMMUNITY SERVICES DEPARTMENT RD MAY Z kiGHIT-OF-WAY.CONSTRUCTION"'PERMIT 0 U W 0 LL4 (P6rmit No. s s u e 3 Q A. Owner:,, Elo ().PC 1(21 E%Wlalwactor: i, con.ST, (o Name Name 21nt o L)e Mailing Addre Mail g Addres' , or) C>s (A14- Woul City State zip. City State Zip S E T� ci r1L §ate License Number Telephone Number C. *'Address or Vicinity ofConstruction: Type of Work to be Done:7)1'0 100 0 D. 0 Work in Connection With: E) Sub or Plat 0 Single Family 0 City Projects 0 Commercial 1'9�Multffamily 0 Utility E. 0 Pavement Cut: El Y EIN F. *.Size of Cut: x APPLICANT TO READ AND SIGN - INDEMNITY: Applicant undtrstands and by his signature to this application, agrees to hold the City of Edmonds..: harmless from any. injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may`�`, be made against the City of Edmonds, or any of its departments or employees, including,or not limited to the'defense of any legal proceedings including defense costs, c6urt cost and attorney fees by'reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIPAND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTXNCh OF THE WORk. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be pro I ce,ssed for issuance ta the applicant. 9 A 24 hour notice is required for inspection; Please call Engineering: 771-3202 .9 Work is. to be inspected during progress. and at- completion. e. * Restoration to be in accordance with City Code. 9 Street to be kept clean at all times. io Tr affic Control to be in accordance with City regulations 9 All!street-cut ditches must be patched with asphalt or City approved material prior'to end of working day; NO'EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. S Si 6atuire- Dc,� Date: Owner or Contractor his Permit Must be. Posted at the Job Site For Inspection'Purposes Call DIAL -A -DIG Prior to Beginning Work Al A A APPROVED BY. Special Conditions: P-Sl' 5 kQ, 4 Receipt No.:— n mro ,e Fund III Fee: — Street Cut Dimensions: RELEASED BYN� S� Date INSPE�JED BY Date NO WORK TO BEGIN: PRIOR TO PERMIT IS.SUA. NCE Erig� Div. March 1989 FIELD INSPECTION NOTES (Fund I I I Route copy to Street Dept.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. J - R . .1 - I � I Z U 9ermit No. CIT OF E�D'MONDS COMMUNITY SERVICES DEPARTMEN i RIGHT - 6F-' WAY* CONSTRUCTION PER§17' T , Fft Issue Date A. 0 _Owner� W N E 0 M B. o Contractor: Name Name '7_it77_o -7&TIA A\[ W -2_%01S 6�w�:J e19 Mailing Address Mailing Address Z M ON n -S, WA f5olvo f__Omowns UJA City State Zip City State Zip Y-V R:r M P, 9-T I FJ -737.0-7 State License Number Telephone Number C.' o Address or Vicinity of Construction: 503 kMA A 14 S Type of Work to b e Done: 1VJ4_,;,TPcLL VNDE1LCx,9,0UW1b FAUL)a1&_C_% eim (.,S' I N (-- -rO PROP. COP-NiZIL . W1 L-L- woe_v_ LQ Vrm D. 0 Work in Connection With: 0 Sub or Plat El Single Family El City Projects El Commercial &?'Multifamily El Utility E. 0 Pavement Cut: P"r El N F 0 Size of Cut: 1-1�( X P.16PKNI-T wouj APPLICANT TO READ AND SIGN INbEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, orclaims of any -kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS. FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. . I Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. e A 24 hour notice is required for inspection; Please call Engineering: 771-3202 9 Work is to be inspected during progress and at';completion. * Restoration to, be in accordance with City Code. is Street to be kept clean at all times. o Traffic Control to be in accordance with City regulations. * All street -cut ditches must be patched with asphalt or City approved material prio�,.to end of working day; NO EXCEPTIONS. I understand the above and'that this permit must be availa . ble at the job,��te for inspection purposes at all times. Signature: . 1464�x Date: Owner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call, DIAL -A -DIG Prior to Beginning Work A&C, APPROVED BY: _1__ PERMIT FEE: Time Authorized: Void after .120 —days. Restoration Fee Special Conditions: Receipt No.: — RELEASED BY: Date 5 Fund I I I Fee: Street Cut Dimensions: x INSPECTED BY Date 9712i W NO WORK TO I1EQI I N,� PRIOR. TO PERMIT ISSUANCE Eng. Div. March 1989 FIELD INSPECTION NOTES (Fund I I I Route copy to Street Dept.) Comments: I Diagram: CONTRACTOR CALLED FOIL INSPECTION 1:1 YES El NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. J 4 1476 PUBLIC. UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY REV. 7/87 LOCATI`ON so _5 s SO c (D AREA POLE NO. c,,W114 S 24- T Z-7 R 3 DATE 15 -'q -;'I I W.O. NO.. 3 Z REASON -FOR WORK CAJ ENGINEER Mf\2.:Tjr4 DWG. NO. 09 1 '2 (o 3 �76 9- C L. DRAFTER U.G. NO. I V-j Isi- cc ST. pc)*%-,(-- u S I 16T z 49 42 SCALE %"=10d 7- t 0 DATE PRINTED fl_ 1-0 A, 4S Ali L-f\ - DATE WORK COMPLETED FOREMAN ENVIRONMENTAL ANALYSIS 0 EXEMPT 0 NOT EXEMP I � -PARA. FEE5.__REQD� YES 111 ONO 18 ITEM C PRIMARY _OVERHE/ D O.H. U.G. COND. KV 0 RE�IbENTIAL ADD CKT. FT. PH 0 COMMERCIAL REM CKT. FT. PH LEO#_____ 7­7-1; NET- CKT. FT. O.H. U.G.'COND. KV SECONDARY -OVERHEAD BASIC -EE� ADD CKT. FT. PH REM CKT. FT. PH NET CKT. - FT. - E-TER-/ CON PbL 77 PERMITS :(DATt-� GRANTED) �RIMAR_"NDERGR0l IND: 0 -TREE TRIM b RESIDENTIAL 0 STATE 0 CC)MMERCIAL-.­--: A- -'BASIC: EE $ OCOU : NTY LEU#: .0 CITY 00;r4oj6.S $ 0 EASEMENTS: SECOND-AR.�-'O't4D'ERGk-OUND--:- -:7-77 �J. q0c, FEE z 0 REOUIRED 10 �NOT REOUIRED —7- 'DATE -RELEASED :_E $ BASIC F `0 FQREIGN CON TACTS FT S O_GTNW -JPN#- STREET---Li 14- T O-CATV- JPN#: T'TRENCH-GTNW-& CATV 0 JOINT BORE GTNW & CATV -WORK, -IN -RIGHT `QF WAY 77- 0 PRIMARY 0 POLE STENCIING 0 S ECONADARY . t FT. 0 $ FROM TO MISCELLANEOUS FEES VAULT S PERMIT $ 'E) 0 TOTAL DUE S DATE PAID RECEIPT# — '��OS _7'3 NEW SVCE APPLICATION# \9& I i2_(D TAKE OFF POLEI PRE—CONSTR. REOUIREMENTS 0 TREE TRIM 10 PUD LOCATOR 00 BACKHOE 0 0 ONE CALL DATE INDEX POLES PLAT I I LOGS I I U—MAPI I I I I XFMR I I C—MAP I I I LOCATION MAP PAGE -S "6 C- !!) APPKUVE 9, SUBSTATION F\\)C- (_o;?-llJC-ZS 0 zso Y-cm 0ow CIRCUIT NO. PHASE koTA Av 6- br=v i_-L&O a*�STO ILA, -r 10 N) 00 J_ a v 7_1 7 _T T4-- j- 4­ J7, _!._J. 1, L 2_1 0 UJALNuT S-r 3 Y. so-a- ZIA-% %�_w zoTH"EET FILE CITY OF EDMONDS E SIDE SEWER P RMIT 18 90 7 PERMIT- N!2 --3315 , 9 c�z Address of C onstruc'tion Prop . erty Legal Description �Inciude all easements): ND 430 0 13, -'Oo �000_3` -Y Owner and/or Contractor: /xi/ State License No. Building Permit No. 0 Single.Fam.ily Multi -Family. (No. of Units 11 Commercial El Public EDMONDS TREATMENT PLANT lnva�ion into City Right -of -Way: X No 11 Yes RW Construction Permit No. RECE.IVFJQother Private Property: ANo El Yes Attach legal description and copy of recorded easement JUN 2 1991 PUBLIC WORKS DEPT. I certify that I have read and shall comply with all city requirements, as indicated on !he back of the Permit -Card. . . 6 Date * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE.USE ONLY, * FOR INSPECTION CALL 771-3202, PUBLIC WORKS DEPT. *� Permit Fee: Trunk Charge: ./00 Assessment Fee: -0 — Lid No.: .. . Partial Inspection: Comments - 43 . Issued By J2L Date Issued: 6 — Receipt.No.: 11.3 2 (y Date —Initial Reason Rejected: Date.1nitial ""'Final Inspection Approved: Datj_m_��Initia ** PERMIT MUST BE POSTED ON JOB SITE ** White Copy; File Green Copy: Inspector Buff Copy: Applicant Revised 3/90 A The City of Edmonds Side Sewer Drawing EASEMENT NO - ------------- ------------------------------ NEW CONSTRUCTION [ZI REPAIRS F-1 LID NO . .................. . ASMT. NO - ------------------ OWNER ------------------------------------------------------------------ ----------------------------- CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO. ................ L JOB ADDRESS ... 0 --- c ----------------- )40-; . ..... �p ------------------ PWW-0001-1 1/75 (REV.1 1/78) LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - --------------------------------------- EDMONDS ---------------------------------------------------------------------------------------------------------------------------- - TREATIVIEKT-ftANT NAMEOF ADDITION ------------------------------------------------------------------------------------------------- --------------------- I !-P. ---c- -46� I Itl vg4uir. tse , #54 64.0 Approved: DATE T7: ............. q1 ...... 7z 41 (e C�t 0 4' 0 lelv. - 7� go 1-e I 0 CITY OF EDMONDS FINANCE DEPARTMENT * EDMONDS, WASHINGTON 98020 (206) 775-2525 W/,Z 'q 9 0 C) *vm F LE STREET ? ASSET INFORMATION SHEET ASSET NO. 6 BATCH DATE —0,69-30-9-1 3 ADD --lTRANSFER -1 RETIRE ACTION: 1Y-Q NEW F F F A S s E CATEGORY CODE: SERIAL NO. DESCRIPTION: 1/z I( ry]eZ!.)r t T I LOCATION: N F "L" - LOCATION CODE: 0 R ACCOUNT NO. DEPRECIATION CODE: 1�61 Y F N LIFE OF ASSET: 2- -5 YEARS A T I 0 WARRANT/PROJECT: NO. DATE: 2-91-t-9-1— COST $ —9-01D-I-0-0— INITIATED BY APPROVED BY TRANSFER DATE TRANSFER FROM TRANSFER TO *"L" CODE T R A N 2 S F 3 E R 4 R ACCOUN ING USE ONLY E T RETIREMENT DATE I R RETIREMENT METHOD E M RECEIPT NO. TOTAL DEPRECIATION E N GAIN (LOSS) T DEPARTMENT FILE ILE CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 * (206) 771-3202 COMMUNITY SERVICES: Public Works * Planning 9 Parks and Recreation e Engineering 890 . 194 August 22, 1991 Robin Michele Pinneo/Michele 21010 - 76th Ave. S.W. Edmonds, WA 98020 LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR RECEIVED SEP 0 6, J99i ENGINEERING. Re: Payment for resurfacing.6th Ave. S., east of Walnut, at 503 - 6th Ave. S. (letter dated April 3, 1991) Dear Robin, With the repair and resurfacing of 6th Ave. S., south of Walnut St., complete, payment for your portion of the road is required. As outlined in my letter of April 3, 1991, your share is $2,667. Please remit the amount stated by September 9, 1991. If you have any questions, please call me at 771-3202, extension 289. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt c: Sharon Nolan, Permit Coordinator MICHELE/TXTST530 0 Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan S 77) T FILE �, �iEE , M E M 0 R A N D U M September 21, 1990 TO: Ed Somers FROM: Gordie Hyde SUBJECT: ADB AGENDA FOR OCTOBER 3, 1990 Engineering has comments on the following agenda items: ADB-83-90 See Engineering comments from earlier agenda. Please provide estimated rockery height. ADB-87-90 See Engineering comments from earlier agenda -- overlay 6th Avenue S. cul-de-sac from centerline to new gutterline with 1 11211 ACP. Seven foot sidewalk is required. Need to see centerline of driveway profile. ADB-43-90 Driveway approach needs to be "high traffic" type. We have no comment on other agenda items. GH/sf n Bob Alberts ADBAGNDA/TXTCSENG SMEET FILE r r CITY OF EDMONDS LARRY S. NALIGHTEN 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 MAYOR COMMUNITY SERVICES: PETER E. HAHN Public Works e Planning e Parks and Recreation * Engineering DIRECTOR 8 90 . 194 September 23, 1991 Robin Michel Pinneo & Michel Inc. 21010 76th Avenue S.W. Edmonds, WA 98020 RE: 503 6th Avenue South --Road Paving 6th Avenue South Dear Robin: Enclosed is your receipt for the money submitted September 6, 1991, for subject road improvements. Sincerely, Lyle Chrisman Engineering Inspector LC/dm Enclosure Michele B:\Word Albere's e Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan "ITY Or EDMONDS N9 -1476-7 'OMMUNITY SERVICES Date: 61�7 teceived ofA,�,"rz, ocot—, r&TR pa*,, 0* oe .0 '.heck V Cash $ 4ater Meter Size: 4ater Connection 3ewer Permit/Repair frunk CFarge ;ewer Connection/LID Fee I/W Construction Permit 3treet Restoration/5treet Cut (620 Fund) 3treet Disruption Fee Eng. 2.2% Inspection Fee Eng. Specs. & Plans Storm Drainage Fee Street Use Permit Building Permit (Type) Plan CF—eck Fee State Surcharge (Fund 622) Zoning Applications (Type) Shoreline Permits S.E.P.A. Review Date of Hearing: Time: By: kt�� Permit #: S77'=ET FILE CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 COMMUNITY SERVICES: 71��_ ';�' Public Works e Planning 9 Parks and Recreation Engineering 9 0 9 4 April 3, 1991 Robin Michele Pineo/Michele 21010 - 76th Ave. S. Edmonds, WA 98020 Re: Resurfacing 6th Ave. S. (503 - 6th Ave. S.) Dear Robin, LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR 0 , e .4 /3/-TI This letter is a follow-up to the meeting I had with Steve.and Dennis Hellegrave of Cornerstone Construction regarding coordinating construction efforts between companies and to suggest the City do the overlay on 6th Ave. S. Per the discussion in the meeting, I see no problem adjusting your catch basin at 6th Ave. S. and Walnut St. and installing a curb inlet at the corner low point if the telephone conduit prohibits the placement of the Type I catch basin. I inspected the condition of 6th Ave. S. to determine if just an overlay or total repair was needed. Based on what I saw, the road surface needs to be reconstructed. If -you wish to have your portion of 6th Ave. S. repaired and paved at the same time 6th Ave. S. and Walnut St. are overlaid, the cost will be $15/S.Y. for cutout and repair and $5/S.Y. for paving. Thus, your total cost will be $2,667. The appearance of a single overlay will do more to enhance the area and provide more protection to the base than segmental resurfacing. If you want the City to have the paving done, please let us know so that we can coordinate the work. In addition, all of your utility work in the 41 street curb construction must be done by the end of July. If you have any questions, please call me. Sincerely, ADDISON L. CHRISMAN IV Engineering Inspector Q!gr- A15eets ALC/sdt Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan E E T F I L E CITY OF EDMONDS LARRY S. NAUGHTEN 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 MAYOR COMMUNITY SERVICES: PETER E. HAHN Public Wor!�S 9 Planning * Parks and Recreation 9 Engineering DIRECTOR , 890 . 19 4 August 22, 1991 Robin Michele Pi nneo/Mi che I e 21010 - 76th Ave. S.W. Edmonds, WA 98020 Re: Payment for resurfacing 6th Ave. S., east of Walnut, at 503 - 6th Ave. S. (letter dated April 3, 1991) Dear Robin, With the repair and resurfacing of 6th Ave. S., south of Walnut St., complete, payment for your portion of the road is required. As Please outlined in my letter of April 3, 1991, your share is $2,667. remit the amount stated by September 9, 1991. If you have any questions, please call me at 771-3202, extension 289. Sincerely, e�� Z ADDISON L. CHRISMAN IV Engineering Inspector ALC/sdt c: Sharon Nolan, Permit Coordinator MICHELE/TXTST530 . I I voc, Alberts * Incorporated August 11, 1890 0 Sister Cities International — Hekinan, Japan FILE M E M 0 R A N D U M August 20, 1990 TO: Ed Somers, Associate Planner FROM: Gordie Hyde, Engineering Coordinator SUBJECT: COMMENTS FROM 8-27-90 CDRC MEETING ADB-86-90: Proposal eliminates two parking stalls. Because the impact is primarily upon the applicant, we would recommend that bollards be placed at the driveway opening and the area be designated as a short-term loading zone or as parking for City vehicles. V/ ADB-82-90:. Seven -foot wide sidewalk is required on street frontages. A twenty -foot long landing at no greater than 6% should be provided. The garage, as designed, creates a sight triangle obstruction. The driveway, as designed, will exceed 14%, which requires a waiver from the City Engineer. The minimum aisle width in a two-way parking lot is twenty-four feet. ADB-88-90-.- We need cross sections through property and show relationship of 100 year storm water level to proposed building elevations. Applicant may have to provide to the City an easement across the open space to enhance fish habitat. Frontage improvements will be required on 76th Ave. W. or a fee assessed in -lieu of construction. ADB-87-90:. 6th Ave. S. must be overlaid from Walnut St. landing at 6% or less, minimum 20 feet long required at exit. Storm water tie-in should be coordinated with neighboring development. New curb to be constructed on 6th Ave. S. with-7' sidewalk. ADB-90-90: Parking spaces need to be delineated by ownership/use. Traffic study -will be required to assess traffic impacts. Existing temporary parking lot must have drainage installed and be paved to City standards. Provide detail of worst case parking stall showing proposed slopes. Provide centerline of driveway profile. Provide cross sections of property. CITY OF EDMONDS FILE ASSET INFORMATION SHEET �J-- , , , i�� �.= NEW ADDITION RETIREMENT ASSET NO. ADDITION TO ASSET NO. DESCRIPTION wattr Lim�e, SERIAL NO. LOCATION X,44-i Atrf—�' Yu,,-t DEPT. NO 6," * * PURCHASE ORDER NO PURCHASE ORDER DATE COST PROJECT NUMBER WoTs 03L- PROJECT COMPLETION DATE COST -as-s-'61 B.A.R.S. ACCOUNT NO. Ll t I — 000 —(l �A — 3 4 5-- 0 0 —4 c� ESTIMATED LIFE INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L. ENTRY REFERENCE ktnp INITIAL DATE /V� VERIFIED BY PROCESSED BATCH NO.- DEPARTMENT FILE Sl'ii'EETBW mi�.% s7- MEMO TO: FROM: SUBJECT: SEWER CONNECTION CHARGES (Street Address) V tjeo " I cw�fx- (Legal Owner) Single Family Residence Subdivision Plat PRD Multiple commercial LEGAL DESCRIPTION: Z.F.F. Calculation: Z.F.F. x Lateral x(2S'j:Z) 4� ) Unit(s) x($25.00 ) st $ zg $ $ $ 4.9; Connection Fee Lateral Charge tquivalent Count (when applicable) Trunk Charge Permit TOTAL J"fli.._.1.ET FILE M E-M 0 R A N D U M September 26, 1990 TO: FILE 503 - 6th Ave. S. Pinneo Michelle 4-Plex FROM: Gordie Hyde, Engineering Coordinator q SUBJECT: DRIVEWAY WIDTH . The parking plan, as proposed, with 211-111 driving width is appropriate with a one-way drive. The code only specifies up to a 19, width with 700 parking. With the proposed 90 degree parking, there is no opposing bank of traffic, so the 211-111 should be adequate to provide safe ingress and egress. GCH/sdt DRVWYWID/TXTST530 ST.71ET FILE BOARD MEMBER KOENIG MOVED THAT ADB-83-90 BE APPROVED AS SUBMITTED PROVIDED THAT AN EASEMENT AND THE COVENANTS PROHIBIT THE GRASSLINED SWALES FROM BEING FILLED IN IN THE FUTURE; HE ACCEPTED AN ADDITION TO THE MOTION FROM BOARD MEMBER ROBERTSON TO NOTE THAT THE SETBACKS WILL BE 25 FEET PER THE REVISED PLAN, THAT THE SIZES OF THE DECIDUOUS PLANTS BE CHANGED TO MEET CODE, AND THAT PLANTING MATERIALS WITHIN THE CANOPIES OF RETAINED TREES WILL ALSO BE RETAINED. THE MOTION WAS SECONDED BY BOARD MEMBER BUTTERFIELD AND CARRIED BY A VOTE OF SIX IN FAVOR TO ONE OPPOSED; BOARD MEMBER BECK VOTED AGAINST THE MOTION BECAUSE 60 PERCENT OF THE LOTS COMPRISE ONLY 83 PERCENT OF THE SQUARE FOOTAGE REQUIRED BY CODE AND ONE LOT COMPRISES ONLY 50 PERCENT OF THE SQUARE FOOTAGE REQUIRED BY CODE. Pk,07.�_99 NEW 4 UNIT APARTMENT BUILDING Pinneo and Michel 503 6th Ave. S. (RM 1.5 Zone) Final Approval This application was considered by the Board at the September 5, 1990 meeting. Since the time of that meeting, the applicant has submitted revised plans to address the Boards concerns. The building has been lowered in height, and a landscape plan has been submitted. In response to a concern raised by the Board at the previous meeting, the Engineering Department has re -reviewed the parking plan and has approved the 21 ft. driveway asile in back of the parking spaces. Gordie Hyde of the Engineering Department has indicated that the 21 ft. wide asile is permitted for one-way traffic. A second concern was raised by the Board about new Federal Fair Housing handicapped requirements that will affect new multi -family projects that are not occupied by March 13, 1991. The Federal requirements are not being enforced by local jurisdictions at this time, but there are stiff fines to developers, architects, and financial institutions who are involved with developments that fail to comply with the requirements. A copy of the requirements has been acquired for the Board members to review. The requirements exempt townhouse developments, and the applicant has indicated that he has designed his proposal to comply with the exemption from the requirements by providing two townhouse units, and two stacked units. The following is an excerpt from the September 5, 1990 meeting minutes. A. Site 1. Nature of Site - The subject site is a RM 1.5 zoned property that has 60 ft. frontage on 6th Ave. S. on both the east and west sides of the site (6th Ave. S. is a divided street at this point). The site has approximately 120 ft. depth, and slopes moderately down from south to north. One single family house currently occupies this property, and the house would be removed as part of the proposal. No grading is indicated. 2. Surrounding Land Use and Zoning - The property immediately to the north is presently vacant, but is proposed to be developed with a 4 unit apartment by a different developer. That proposal was approved by the Board at the August 1, 1990 meeting. The properties across 6th Ave.-S. to the east and adjacent to the south are zoned RS-6, and developed with single family residences. The property across 6th Ave. S. to the west is zoned RM 1.5, and is developed with townhouse apartments. 3. Access - Access to the site is planned via 6th Ave. S. on both the east and west sides of the site. The access would be to an underground garage which would have a one-way drive through. The entrance to the garage would be on the west side, and the exit would be on the east side of the garage. 4. Off -Street Parking - Parking for eight vehicles, two per unit, is proposed to be provided under the building. This amount of parking meets Code standards. Site Development Standards - Setbacks of 15' are required on the east and west sides of the site, and 10' on the north and south sides. The street and side setbacks are adequate as shown. Lot coverage is 45%, and is at the maximum permitted. ADB Minutes October 3, 1990 Page 10 0 B. Building 1. Size - 401 x 861, or 3,240 sq. ft. 2. Height - Maximum proposed building height is 301 with a sloped roof. This ___ F comp ies with the 25' height with 5 ft. additional height permitted for a sloped roof. 3. Exterior Details: a. Walls - 6 " horizontal wood siding painted Peppertree gray -green. trim would be cedar painted Riviera Green. b. Roof - roof material is indicated as composition and Char/grey color. c. Window frame materials are indicated as white aluminum or vinyl. A colored rendering will be at the meeting. C. Lighting, Trash, Miscellaneous 1. Exterior lighting: No exterior lighting is indicted on the plans. 2. Trash: Trash enclosures and recycling -areas are to be located on the north si Fe -of the building. 3. Miscellaneous - No mechanical equipment is shown on the roof. Any exterior Te—chanical equipment must be screened. Utility meters must be painted to match the building. D. Landscaping, Fencing, Rockeries 1. Landscaping - No landscape plan has been submitted for the preliminary review, however a landscape plan will be submitted with the final plans. 2. Fencing - A cyclone fence is located along the north property Ti�ne, and a 6 ft. cedar fence would be provided around the dumpster and recycle areas. The applicant has not indicated any other fence on his plans. 3. Rockeries- 3 ft. rockeries are shown around the driveways. E. Signs - None planned at this time. F. Engineering Division Requirements The Engineering Department has completed a preliminary review of the project and has concluded that 6th Ave. S. on the west side of the site must be overlaid from Walnut St. A landing at 6% or less, for a minimum of 20 feet long is required at the exit. A storm water tie-in should be coordinated with neighboring development. and that a New curb will be required and need to be constructed on 6th Ave. S. on both sides of the site with a 7 ft,., sidewalk. These are preliminary comments, and additional comments may be generated as the plans are finalized. 1. The following is required with a building permit: --a utility development plan. --bonding to City code. 2. Underground wiring is required. 3. If more than 500 cubic yards of earth are to be moved, a conditional use permit -is required from the Edmonds Hearing Examiner. 4. A 7' sidewalk is required along east and west property lines. 5. An engineered drainage plan is required. ADB Minutes October 3, 1990 Page 11 0 0 No landscape plan has been provided, and a landscape plan must be submitted for Board approval at the next review. Findings 1. Section 15.20.005 of the Edmonds Community Development Code contains policies for multiple family development. The Board should review these policies, condition approval where necessary, and must make the finding that the proposal is consistent with the Comprehensive Plan and other adopted City policies. Since this property abuts single family zoning the Board should pay particular attention to the policies in Section 15.20.005 2.(b) and also 2.(c) 1) (attached). 2. The subject proposal needs to comply with the Engineering Department's requirements for parking access and street improvements to comply with Section 18.75 of the Edmonds Community Development Code. 3. Chapter 20.10 of the Code contains ADB review criteria. As called for in this section, the Board should require curbs where landscaping meets driveway areas, should review the building to see that it meets the basic design requirements and must find that the proposal in general satisfies the criteria and purposes of Chapter 20.10 of the Code. DISCUSSION The applicant, Rob Michel, 21010 76th Avenue West, described the proposed project and said that a landscape plan will be provided as soon as possible. This is the last lot in a multifamily zone that is adjacent to a single-family zone. Rick Albright, 518 6th Avenue South, who lives immediately south of the project, thanked the Board for its efforts in keeping him and his neighbors notified about action on this proposal. He requested that the height of the building be lowered by building a flat rather than a peaked roof, asked about a fence and/or landscaping between the subject property and his, and asked if the rectangles shown on the south side are planter boxes or surface features. He also asked if any variances would be required for the building. Mr. Somers replied that they would not. The Board had some questions about the parking lot: the plan shows a 21-foot back-up area, which Mr. Michel said has been approved and several Board members thought should be 24 feet. Board Member Hummel asked Mr. Somers to obtain a written answer from the City on that. Board Member Bylsma asked for more information on the grades and the impact of grading on existing trees, and suggested that the building could benefit from additional excavation so that it would be more cut into the site. He did not feel that the attempts at modulation on the north elevation succeeded in breaking up the flat plane. He found the east and west elevations to be satisfactory. The south elevation appears boxy and needs modulation. Board Member Bylsma told the applicant that it is necessary for a building that is in a position of transition from multifamily to single-family to be broken up into a semblance of individual -appearing units in order to blend with the smaller scale of the adjacent single-family homes. He suggested that breaking up the roof line would help accomplish this. Board Member Robertson noted that the entry to the building will be on its south side, and suggested that the entrance be moved to its north side, leaving the single-family neighborhood with less additional traffic. She also noted that the entrance will have lights burning all night, which could negatively impact neighbors. Mr. Michel pointed out that'most residents will be coming up from the garage below, not through the south side entrance. Board Member Butterfield asked about the need for a railing on the entry porch on -the south elevation'. Mr. Michel said that it was his understanding that none is required, but one will be added if required. Board Member Koenig asked how the project will meet the new fair housing law that requires all first -floor units to be handicapped -accessible. Mr. Michel said that he is not aware of any such requirement, which Board Member Koenig explained is not City Code but rather Federal Fair Housing Code and will go into effect in March, 1991. Mr. Michel will look into that. Board Member Butterfield said that he likes the proposed colors. ADB Minutes October 3, 1990 Page 12 ACTION BOARD MEMBER BYLSMA MOVED THAT ADB-87-90 BE GIVEN PRELIMINARY APPROVAL WITH THE FOLLOWING AMENDMENTS: THAT THE APPLICANT SUBMIT A MORE DETAILED GRADING PLAN AND LANDSCAPE PLAN; THAT THE BOARD OBTAIN A LETTER FROM THE TRAFFIC DIVISION REGARDING THE PARKING LAYOUT TO ENSURE AN ADEQUATE BACKUP AREA; THAT THE APPLICANT CONSIDER MOVING THE ENTRYWAY FROM THE SOUTH TO THE NORTH ELEVATION; THAT THE APPLICANT PROVIDE MODULATION IN EXCESS OF THREE FEET ON THE SOUTH SIDE TO PROMOTE AN APPEARANCE OF INDIVIDUAL UNITS; THAT THE LIGHTING ON THE SOUTH ELEVATION BE ORIENTED IN SUCH A WAY AS TO NOT CAUSE A GLARE PROBLEM TO THE RESIDENCES TO THE SOUTH; THAT THE STAFF REPORT BACK TO THE BOARD REGARDING A POSSIBLE FAIR HOUSING CODE REQUIREMENT THAT GROUND -FLOOR UNITS BE ACCESSIBLE TO THE HANDICAPPED. THE MOTION WAS SECONDED BY BOARD MEMBER BIRCH AND CARRIED. DISCUSSION Board Member Hummel asked whether the staff report showing 7-foot sidewalks required on both sides of the property is correct. The applicant, Rob Michel, 21010 76th Ave W, said that the street on the east side is little more than an alley and that the City is not requiring a 7-foot sidewalk on that side; there is not room for one and one had not been required on the property directly to the north of his. Mr. Somers said that if a 7-foot sidewalk is not feasible on the east side, the applicant should petition the Engineering Department to waive that requirement; it does not affect the! Board's approval of the site plan. Mr. Michel described changes he had made, based on the Board's recommendations: more modulation in the north and south elevations, more definition to individual units, elimination of the raised porch area, and deletion of two of the entry lights. Rick Albright, 518 6th Ave S, a neighbor of the project, spoke in favor of the changes made in the plan and said that he agreed that a 7-foot sidewalk on the east side would be inconsistent with the existing configuration. Board Members Beck, Bylsma and Hummel complimented the applicant on the changes in the design to accommodate the Board's suggestions and the desires of the neighborhood. Board Member Robertson asked the applicant to specify what kind of laurel will be planted and the spacing of the Hahn's ivy to meet Code. She asked that the azaleas and rhododendrons be called out as,specific varieties, not just species, and that specific varieties be grouped together to get a massed effect. The rhododendrons should be behind the shorter material at the curb side with the taller material behind; on the southeast, the rhododendrons should go on top of the rockery and an azalea bed below. She suggested that the boxwood would work better behind the lawn instead of in front and that Japanese holly might be a better choice that boxwood. ACTION BOARD MEMBER BECK MOVED THAT ADB-87-90 BE APPROVED WITH THE CHANGES NOTED BY BOARD MEMBER ROBERTSON ON THE LANDSCAPE PLAN AND WITH THE RECOMMENDATION THAT THE REQUIREMENT FOR A 7-FOOT SIDEWALK ON THE EAST SIDE BE WAIVED. THE MOTION WAS SECONDED BY BOARD MEMBER BYLSMA AND CARRIED. ADB-95-90 NEW BULKHEAD AND WALKWAY FOR THE PORT OF EDMONDS Peratrovich, Nottingham & Drage 336 Admiral Way, (CW Zone) Preliminary Review. This project is to the Board for preliminary review of the design only and for public comments. SEPA review on this project has not yet been completed. No decision on the project can be made until after the SEPA review is completed, however, the Board can make preliminary comments on the design and landscaping at an early stage. The changes to the project will go back to the Board for final approval when the SEPA determination is completed. Additional conditions may be imposed through the City's review of the final plans and SEPA review of impacts of the project. Findings 1. The proposal appears to be consistent with the Comprehensive Plan and other adopted City policies. ADB Minutes October 3, 1990 Page 13 8"�CET FILE ADB-87-90 NEW 4 UNIT APARTMENT BUILDING Pinneo and Michel 503 6th Ave. S. (RM 1.5 Zone) Preliminary Approval A. Site 1 . Nature of Site - The subject site is a RM 1.5 zoned property that has 60 ft. frontage on 6th Ave. S. on both the east and west sides of the site (6th Ave. S. is a divided street at this point). The site has approximately 120 ft. depth, and slopes moderately down from south to north. One single family house currently occupies this property, and the house would be removed as part of the proposal. No grading is indicated. 2. Surrounding Land Use and Zoning - The property immediately to the north is presently vacant, but is proposed to be developed with a 4 unit apartment by a. different developer. That proposal was approved by the Board at the August 1, 1990 meeting. The properties across 6th Ave. S. to the east and adjacent to the south are zoned RS-6, and developed with single family residences. The property across 6th Ave. S. to the west is zoned RM 1.5, and is developed with townhouse apartments. 3. Access - Access to the site is planned via 6th Ave. S. on both the east and west sides of the site. The access would be to an underground garage which would have a one-way drive through. The entrance to the garage would be on the west side, and the exit would be on the east side of the garage. 4. Off -Street Parking - Parking for eight vehicles, two per unit, is This amount of parking meets Code proposed to be provided under the building. standards. S. Site Development Standards - Setbacks of 151 are required on the east and west sides of the site, and 101 on the north and south sides. The street and side setbacks are adequate as shown. Lot coverage is 45%, and is at the maximum permitted. B. Building 1. Size - 401 x 861, or 3,240 sq. ft. �ei n - This 2. H ht Maximum proposed building height is 30' with a sloped roof. com� p ies with the 25' height with 5 ft. additional height permitted for a sloped roof. 3. Exterior Details: a. Walls - 6 1 horizontal wood siding painted Peppertree gray -green. trim would be cedar painted Riviera Green. b. Roof - roof material is indicated as composition and Char/grey color. c. Window frame materials are indicated as white aluminum or vinyl. A colored rendering will be at the meeting. C. Lighting, Trash, Miscellaneous 1. Exterior lighting: No exterior lighting is indicted on the plans. 2. Trash: Trash enclosures and recycling areas are to be located on the north siFe-of the building. 3. Miscellaneous - No mechanical equipment is shown on the roof. Any exterioF -mechanical equipment must be screened. Utility meters must be painted to match the building. D. Landscaping, Fencing, Rockeries 1. Landscaping - No landscape plan has been submitted for the preliminary review, however a landscape plan will be submitted with the final plans. 2. Fencing - A cyclone fence is located along the north property TUn_e_;__a_nd a 6 ft. cedar fence would be provided around the dumpster and recycle areas. The applicant has not indicated any other fence on his plans. ADB Minutes �09�eTher 1, 1990 3. Rockeries- 3 ft. rockeries are shown around the driveways. E. Signs - None planned at this time. F. Engineering Division Requirements The Engineering Department has completed a preliminary review of the project and has concluded that 6th Ave. S. on the west side of the site must be overlaid from Walnut St. A landing at 6% or less, for a minimum of 20 feet long is required at the exit. A storm water tie-in should be coordinated with neighboring development. and that a New curb will be required and need to be constructed on 6th Ave. S. on both sides of the site with a 7 ft. sidewalk. These are preliminary comments, and additional comments may be generated as the plans are finalized. 1. The following is required with a building permit: --a utility development plan. --bonding to City code. 2. Underground wiring is required. 3. If more than 500 cubic yards of earth are to be moved, a conditional use permit is required from the Edmonds Hearing Examiner. 4. A 71 sidewalk is required along east and west property lines. S. An engineered drainage plan is required. No landscape plan has been provided, and a landscape plan must be submitted for Board approval at the next review. Findings 1. Section 15.20.005 of the Edmonds Community Development Code contains policies for multiple family development. The Board should review these policies, condition approval where necessary, and must make the finding that the proposal is consistent with the Comprehensive Plan and other adopted City policies. Since this property abuts single family zoning the Board should pay particular attention to the policies in Section 15.20.005 2.(b) and also 2.(c) 1) (attached). 2. The subject proposal needs to comply with the Engineering Department's requirements for parking access and street improvements to comply with Section 18.75 of the Edmonds Community Development Code. 3. Chapter 20.10 of the Code contains ADB review criteria. As called for in this section, the Board should require curbs where landscaping meets driveway areas, should review the building to see that it meets the basic design requirements and must find that the proposal in general satisfies the criteria and purposes of Chapter 20.10 of the Code. DISCUSSION The applicant, Rob Michel, 21010 76th Avenue West, described the proposed project and said that a landscape plan will be provided as soon as possible. This is the last lot in a multifamily zone that is adjacent to a single-family zone. Rick Albright, 518 6th Avenue South, who lives immediately south of the project, thanked the Board for its efforts in keeping him and his neighbors notified about action on this proposal. He requested that the height of the building be lowered by building a flat rather than a peaked roof, asked about a fence and/or landscaping between the subject property and his, and asked if the rectangles shown on the south side are planter boxes or surface features. He also asked if any variances would be required for the building. Mr. Somers replied that they would not. -foot back-up The Board had some questions about the parking lot: the plan shows a 21 area, which Mr. Michel said has been approved and several Board members thought should be 24 feet. Board Member Hummel asked Mr. Somers to obtain a written answer from the City Engineer on that. Board Member Bylsma asked for more information on the grades and the impact of grading on existing trees, and suggested that the building could benefit from additional excavation so that it would be more cut into the site. He did not feel that the attempts at modulation on the north elevation succeeded in breaking up the flat plane. He found the east and west elevations to be satisfactory. The south elevation appears ADB Minutes �gteT�er 5, 1990 0 0 boxy and needs modulation. Board Member Bylsma told the applicant that it is necessary for a building that is in a position of transition from multifamily to single-family to be broken up into a semblance of individual -appearing units in order to blend with the smaller scale of the adjacent single-family homes. He suggested that breaking up the roof'line would help accomplish this. Board Member Robertson noted that the entry to the building will be on its south side, and suggested that the entrance be moved to its north side, leaving the single-family neighborhood with less additional traffic. She also noted that the entrance will have lights burning all night, which could negatively impact neighbors. Mr. Michel pointed out that most residents will be coming up from the garage below, not through the south side entrance. Board Member Butterfield asked about the need for a railing on the entry porch on the south elevation. Mr. Michel said that it was his understanding that none is required, but one will be added if required. Board Member Koenig asked how the project will meet the new fair housing law that requires all first -floor units to be handicapped -accessible. Mr. Michel said that he is not aware of any such requirement, which Board Member Koenig explained is not City code but rather federal fair housing code and will go into effect in March, 1991. Mr. Michel will look into that. Board Member Butterfield said that he likes the proposed colors. ACTION BOARD MEMBER BYLSMA MOVED THAT ADB-87-90 BE GIVEN PRELIMINARY APPROVAL WITH THE FOLLOWING AMENDMENTS: THAT THE APPLICANT SUBMIT A MORE DETAILED GRADING PLAN AND LANDSCAPE PLAN; THAT THE BOARD OBTAIN A LETTER FROM THE TRAFFIC DIVISION REGARDING THE PARKING LAYOUT TO ENSURE AN ADEQUATE BACKUP AREA; THAT THE APPLICANT CONSIDER MOVING THE ENTRYWAY FROM THE SOUTH TO THE NORTH ELEVATION; THAT THE APPLICANT PROVIDE MODULATION IN EXCESS OF THREE FEET ON THE SOUTH SIDE TO PROMOTE AN APPEARANCE OF INDIVIDUAL UNITS; THAT THE LIGHTING ON THE SOUTH ELEVATION BE ORIENTED IN SUCH A WAY AS TO NOT CAUSE A GLARE PROBLEM TO THE RESIDENCES TO THE SOUTH; THAT THE STAFF REPORT BACK TO THE BOARD REGARDING A POSSIBLE FAIR HOUSING CODE REQUIREMENT THAT GROUND -FLOOR UNITS BE ACCESSIBLE TO THE HANDICAPPED. THE MOTION WAS SECONDED BY BOARD MEMBER BIRCH AND CARRIED. ADDITIONAL DESIGN BOARD COMMENTS Mr. Somers informed the BoarU of a letter from the Mayor requesting ADB comments on the possibility of installing a sani-can adjacent to the AM -PM Minimart on the corner of 5th and Dayton. The purpose would be to resolve the problem of people urinating on the side of the building. It was the consensus of the Board that this proposal would not necessarily solve the problem and that if public rest rooms are needed in the area, permanent facilities could be considered. After discussion, Board Member Hummel moved to advise the Mayor that the ADB is not in favor of installing a sani-can at the corner of Sth and Dayton. The motion was seconded by Board Member Robertson and carried. Mr. Somers reported on enforcement issues brought up by the Board: The Page Realty sign was inspected by code enforcement technician John Bissell on September 5, 1990. The sign in question is an open -house -type. sign which is posted in the parking area and identifies the parking stall as reserved for the Page Realty employee of the month. Mr. Bissell found it to be an incidental sign, which requires permit but may be reviewed by the Board at its discretion. The Community Development Code defines an incidental sign as "one which does not advertise or identify a good, service, or business, and which is provided solely for the convenience of the public. (Section 20.60.060(A)) no It was the consensus of the Board that this sign is provided to advertise a business rather than for the convenience of the public. Mr. Somers was requested to advise Page Realty either to take the name of the business off the sign so that it says only "Employee of the Month", or if the name of the business remains on the sign, Page Realty shall apply for Board approval for the sign. It is the opinion of the public works superintendent that the street tree that was severely pruned in front of Jay's Minimart will not survive well. Since the problem was that the tree blocked the sign, Mr. Somers suggested that a smaller tree or shrubbery be planted there. The Board concurred. Board Member Bylsma asked Mr. Somers to follow up on the problem of Lotto signs and neon beer signs in every window. It appears that a business has been illegally operating in the duplex across the street from Edmonds High School. There isn't any work currently going on, but an effort is ADB Minutes �SqteT�er 5, 1990 0 being made to locate the owner and any operations engaged in by the occupants will be shut down. Board Member Birch asked if any applications have been received on the Chevron Station across from Edmonds High School, and Mr. Somers replied than none have. Mr. Somers reported that the banner was removed from the Sail Inn Tavern. The owner of the Centennial building has indicated that he will come before the Board to ask to paint his rooftop equipment. He will bring with him photographs taken from the condominium up the hill. Mr. Somers provided Board members with copies of a letter from the Elm Place Homeowners Association regarding trees in the PRD that were removed. He has given Mrs. Fosso of the Homeowners Association until next Wednesday, September 12, to provide a replacement landscaping plan or face enforcement action. He said there seems to be feeling in the Homeowners Association that they are not obliged to do this. Board Member Bylsma suggested to Mr. Somers that a letter to the Homeowners Association from the City Attorney explaining enforcement of the City's landscape requirements might be worthwhile. In response to a concern raised by Board Member Bylsma about illegal window signs in downtown, Mr. Somers said that the code enforcement officer is going to be doing a sweep of the downtown area for window signs and sandwich boards that are not in compliance with the Code. There was discussion among the Board of ADB-3-90, which was sent to the City Council and, according to the City Council minutes of August 21, 1990, is being remanded back to the ADB for further review. Board Member Hummel asked. Mr. Somers to provide the Board with a brief summary of the City Council's concerns, to be included in the next Board packet. Board Member Robertson asked if the landscape guidelines have been approved as part of the Code yet. Mr. Somers replied that they have not. Board Member Robertson asked Mr. Somers for the latest version of the proposed guidelines, and said that she would provide input into those guidelines. The next meeting of the ADB, on September 19, will be in the conference room in the Planning Department. The meeting adjourned at 10:20 p.m. ADBMN905/TXTADB ADB Minutes �Sq�e Wr 5, 1990 uj 0 I F 0 1:4 Ld�e� 0 25' 7 6' . .. ................... .. . .. . .. ONE WAY TRAFFIC cm w 2 3 4 5 6 7 ci (o 20' 18' + - r[8'6,-, 8' 6 86' 120.00' PARKING PL4N lit = 1 1 Oil m 0 cn 4-1 < < iEg' 19, DUMP CLE CE a, d3 4 (9 KL'INE v T FF T�l KOCK ----------- --------- .109. 'c .... ... ... 07. -EWCE Ob RECEIVED NOV2.1 2011 BUILDING DEPARTMENT UTY OF EDMONDS '12'/'2'9"/211 2 PGS 01 2 � 3:58�m �63 . 00 SNOHOMISH COUNT , 'ASHINGTON Return Recorded Instrument To - City of Edmonds Development Services Department - Planning Division 121 5h Avenue North, Edmonds WA 98020 REASONABLE ACCOMMODATION COVENANT Property Address: 503 6 1h Ave. S, Unit 3, Edmonds Washington Assessor's Parcel Number: 00799800000300 503 - 6TH AVENUE SOUTH CONDOMINIUM BLK 000 D-00 UNIT 3 TGW UND 25% Legal Description: INT IN COM AREAS & FAC DESC IN DECL REC AF 9112050108 & AMD AF200306200348 Owners/Grantors: Samuel and Goldy Marsh / Marsh Living Trust Grantee: City of Edmonds Reference Number: STF20100025 WHEREAS, the undersigned owner of property located at 503 6 1h Ave. S, Unit 3, Edmonds, Washington legally described herein, has applied for a reasonable accommodation from the strict requirements of the Edmonds Community Development Code (ECDC) pursuant to Chapter 17.05; and WHEREAS, the City of Edmonds requires as a condition of the issuance of land use and construction permits that this covenant be signed, acknowledged, and recorded in the records of Snohomish County; NOW, THEREFORE, the owner agrees as follows: I . The Owner must inform all successors and assigns of the property that a reasonable accommodation has been granted pursuant to ECDC 17.05.040 to allow the construction of a handicapped -accessible ramp and landing for access to the main entrance of the residence (Unit 3) as depicted in Exhibit A for the benefit of Mr. Marsh. 2. The Owner must inform all successors and assigns that the ramp and landing are constructed within the minimum required 10-foot side setback from the south property line and that presence of the ramp and landing cause the site to exceed the maximum allowed lot coverage of 45 percent applicable to the RM-1.5 zone. 3. The Owner must inform the City guilding Official in writing within 30 days of any change in property ownership or when Mr. Marsh no longer resides at the residence. 4. The Owner must inform all successors and assigns that the reasonable accommodation for the ramp and landing as depicted in Exhibit A is personal to Mr. Marsh and does not run with the land. If Mrs. Marsh or a subsequent owner is in need of such accommodation, the Owner must reapply to the City for reasonable accommodation of the ramp and landing within six months after Mr. Marsh no longer resides at the residence. 5. The Owner must remove the ramp and landing and return the landscaping to the condition that was previously existing prior to construction of the structure or as otherwise approved within six months of when the structure is no longer required for accessible egress. In the event that the structure is no longer required, the Owner must obtain all required demolition permits for its removal prior to commencing that work. 6. The Owner must obtain a complete building permit for the ramp and landing in accordance with all construction codes and ordinances in effect on the date of the application for the building permit. Any -and all deficiencies noted during inspection of the ramp and landing must be corrected within 60 days of notification. OWNERS/GRANTORS: SANJVEL MARSH -and- GOLDY MARSH SIGNATURES: DATED this izIZWA�f December 2010 0 'IJ&v crsonally appeared before me SAMUEL AND GOLDY MARSH, to me known to be the individuals and who executed the within and foregoing instrument and acknowledged that they signed the same as act and deed, for the use and purposes therein mentioned. WTAW Dated: C) Signature of Notary Public: !tb My Commission Expires: W fillo% - THIS DOCUMENT MUST BE RECORDED WITH THE SNOHOMISH COUNTY AUDITOR — c� (D ce) ;a 27'-0" Marsh Ramp SIZE FSCM NO DWG NO REV Jon Elkins 253-335-1277 SCALE 1/8" = 1*-0" SHEET 1 OF I Y. ,kr % y c * 4- NEW. 05 6th-Avc'-50- WCURD CUT oil % �WLK 12' . . ........ faOO .......... V-0 70 Qn, m 201, r m % % % - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1z Z E Z), i T- ;5.1 --1 m 'IC) X .7 c m ::j .7z Z Qp m Q) 0� 9: Qn < Ir > -n 713 m m M m z C-) I- - - - - - rn P m -------------------- - b) m Z M M ::E Z. > m CIM ::E FORCH 73 m -M rfrd - c) > c') /IT z "I 6D wv� m '0 z C, m tA fix: "CURB CU EW A T 4XI &A-M iv E D 4,14M APR 4-1991 nrIDUIT (IAHNTIPR MGM IST allow ow All, 7 -, MI N10111R.'' ;AIR. A. MEADOWDAILE A A TA @OT I 7MO III *V, a a Sets ..j! EAV z,2 Sal.l D NTY PARK v a. 13 18 I.T. F ell Alli�� Eel. Ill w 4� fle, &. ST. 3 S EAAmE %V!X H LEAd "I" g 4, III iG 4 "Is, $'a _AD 3, a o I Ari, .414, 'MoH. a.— J*2.D A, va. 2 r7n, _L_ A _T. PVVI -IOD1 L. SIT OLYMPIC 24 b tp . . . . . . . ..... ELE" . . V , scm e PAR s.m. At ST 3 s, v rrl— lew DOE I.w I r mooq vIV VISTA *IV A—. L161A _.r . MAPLEWOOD .9 E. ST. ILL IELEM SCm .4 B.ACKI!Tr LAND jR -two IS H1 & PAST, sc 8 IT IT Al DALE, .1. all MI. o "0"0' Eal slVeS,, a. 2. "VII SELL S; AtAl. 6, f DMCrS8.8 AAINi4 IT LEM a.. - All v. ItDt. BE 9* -6yosT al PARK yi'R IVA: '4,, 1 air" put) j_-1 Lt MA. .1 0 LIVI 29 4 SHIUCE sit r=w CITY BT LALIM 1. HIGH BEAC. ITY el ; 1 1 Al A, r) SCHOOL uNTON OIL I IN T $* Doc N t all'. - 1 1. u__ EDWARDS mr* A I, SIT it POINT C1 2161 L'K, 10.61 "IT. 81 M CHASE Or I IIT A IL. 01-1 = "BI a* 4 IL. .1 1 ft. .1 1 1; SiT we IL v lei w "DATE vol"" SEE." RL luu seem a 4t TA Ale O'U N T L A X E efj W 6 0 D W A Y c. t TI R N A C E. 26 11 Sel, 36 31 oo b VASE Sit lot w. SEE— $3 87 Vtow MIS Pae I — at Z c Se, few BY ooem-sxom AS" �:10_ f =-MY Se A Al l ilk, 4 U PL SIT a- % IT al� Ell SIT SESSEM rL We I SNOHOMISH COUNTY 35 Mgt .T27N uft iZ-11— _0UNfY_ Al IIG if T26N 2 TV SOM SIT Eal. .1 -�A;4�j"100 ME A72 I "D , . . 7 6 N*'w sr tA0 FOU" PAM A 1 11-1 — —1 — TO KEMAIN CEPAK FENCE LANDE)GAFE FLAN 1 10, 0. FLANT 5CHErA LE CQMMQN/f30TANIGA[. NAME - v r i r a/ Mountain Hrmlock Acc- circimitu-m/ vire-. mopl(, Khode,icn6iron6pp(C;,ROUP5AMEVAPiEM 24-30' Aaurcl 5 gallon F�iotlriin Frazer/ Frazer Phot�mii 5 gallon (D - Viburni;m Dividii/ Mumurn 2 gallon /0")% — Azilea 5;)p (GROUF 5AME VARIFT'� 2 gallon t4o 0, - i3uxut3 gcrnpervirc;ri!5/'5uffi-utico�,a' 2 gallon Hc,lcr-,) Heli,.</ "K)hn'o k� 4" f . 'otgingllplantirigbcd!3024';O,C. I 1� I 7+a 7 IOR 2 louNrEl? IN 25' 76' 19, 201 roll 102.18 PATUM PT. 108 108 106 MH 108 EX15TING CYC. FENCE % % EXIOTING to NEW Coric/ CUR13 FUTURE RECYCLE ENCLO5U'RE OfbACK LINE 0CEDAR FENCE AREA - (o-'FENCE % 03 r E FENCE 41 log-ro,90 0 -- - - - - - - - - - - - A - - - - - - - - - - - - - - - - - - - - - - % 10 — — — — — — — — — — — — — — - A5FHAL r PRIVE 5ETOACK LINE ONE WAY TRAFFIC ONE WAY TRAFFIC ASP�ALT: RKIYE ROQ�,ERY j EASTING MIES< TO 15E REmovFD,, y2_11 < EX15TING 5TRUCTURE — — — — — — - I Z3 421 < TO DE REMOVED 1 MAN < - - - - - - - - - ROCK N los JI-3 110 owsK OVERHANG o" 4 - — - - - - — - - - - — - - — — - - - - - - - - - T - - - - - - - - - - - - - - roRc" C 109. 112 n E w -c?) N C. WAL,�, 110 -112 ------- 120.00' --------- 0 NEW (a-'CEDAP, FENCE7��"7 15' 86, e- 19, AA 10:1 ROCKEKY SECTION [343 SECTION A -A 12% ------- lo� I --I F LOT FLAN ill = 101 011 4 KINGSIQN_ i pw LEGENP .......... EX15TING CONTOUR5 PROPO5EP CONTOUR5 PROPERTY LINE 7- 6ET13ACK LINE LEGAL DE5CRIPTION: LOT5,1,2,3, AND 4,13LOCK 93, CITY OF EDIVION05, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 2 OF FLAT5, PAGE 39, IN 5NOHOM15H COUNTY, WA5HINGTON; EXCEPT THE NORTH 50 FEET OF 5AIP LOTS, 1,2,3, AND 4. (AL50 KNOWN A5 LOT 2 OF CITY OF EDMOND5 5HORT FLAT #3-57-78, RECORDED UNDER RECORDING NUM13EK 79041M93.) TAX ACCOUNT #: 4342-093-001-0003 H EIGHT- CALCULATION A 109.639 13 108.03 C 109.13 111.b4 438.69 TOTAL + 4 = 109.637 (MEDIUM GRADE) DATUM POINT = MH IN 5TREET EA5T OF PROP. 1. NAME OF PROJECT: PINNEO & MICHEL FOUR UNIT APARTMENT 2. OWNER5: PINNEO & MICHEL 775-4480 3. DRAWN 13Y- KO5IN W. MICHEL 775-4480 4. 5TKUCTURAL ENGINEER: GREG HIATT, P.E. 276 WYATT N.W. WIN5LOW, WA 842-7714 5. CONTACT PER5ON: ROL3IN W. MICHEL 775-44130 ro. 51TE AREA: 7200 5QUARE FEET (65OW120') 7. LOT COVERAGE: 45% (324,0 SQ. FT.) 8. 70NING: RM 1.5 9. AD5 NUM5ER: A013-87-90 (10/3/90) 10. PROP0,5ED U5E: RE51DENTIAU MULTIPLE 11.5E15MIC ZONE: 3 PER CHAPTER 23 OF THE U13C 12. OCCUPANCY U5E.- 4 LIVING UNITO 13. OCCUPANCY GROUP: R-1, M-1 14. 13UILPING TYPE: V* 15. OQUARE FOOTAGE 13Y FLOOR: [3A5EMENT/GARAGE 3240 (MAIN 2953, PRIVATE 200, 5TAIF, ENCL05URE 57) FIR5T = 2996 5ECOND = 2996 16. TOTAL 13UILDING AREA: 6049 Rl/ 3193 MI 17. OCCUPANCY LOAD: .30 18. REQUIRED PARKING 5TALL5: 8, PKOPO,5E[): 9 19. COMPLY WITH 1988 U13C, UPC, UMC & WA5HINGTON 5TATE ENERGY CODE 20. NUME3EK OF 5TOP\IE5: 2 21. I3A5IC WIND 5PEED: 80 MPH 22. EXP05UKE: 13 23, A � VICINITY MAF' N X4. _5 108 108 11113-IING CYC, FINCI 7 .1 V Z. 7 7 IZ- 77.33 ft 2 91 ........... . ...... . ............ ... .. .. ............. ............ ....... . ........... C:): ................... .... ......... .......... .. cd ... ....... .. .............. C) 1805.13 CD ... Z, ...... ............... ...................... .................. .... . . ................. X. ... ...................... ... ............... ..... ............ ..... . . . .............. ....... .............................. ....... .. . ............................. ASPHdL7 110 N N NNSNNNNN DRIVE % % 580.47 fe., 2 273.78 f ED t . . . . . . . . . . ... . . . NI, . . . . . . . ........ . . . . . . . . .6666 )"N' N N % N 1 1.84 ... .............. ................ . ............... . ........... . ............. j ................. ................ . . . .................................. ..... .. ... ... ... ....... ..... .. N N 1 09.13 N N N ... ............ ...... % % % % L 112.39 120.00' 110 112 1 14 - - - - 1107 78 CATC$4 BA�51N: T"VPE- _Z Vil LO C r-1/411 I -ID EX15TING 51TE FLAN 4- (o ft- TOILC NC W Ur NGTH VISUAL-) STANDARD DRAINAGE PLA N , I - 1 1 10 0. TEE W1 4'Ln NG LF_ rs -4 OOT I NG DRAIN SYSTEM CROSS-SECTION— MIRAff I .500X C>F- ns�ulvff_L_F_� - TO f5f� LAYED 10W W&I'S �_: tf P Ko�z_ -T PE lC" COVER 3/40- 0/2" WASWED G PLAN E L 4 DIAM PIERF PU TRENCH CROSS-SECTION DETENTION SYSTEM for location. 5-0-3 -6 7- �7 S _. plan by k, mle,"rl- phone- -77Z_-*4_L? date- 1-0-0�-ql DESIGN DATA System Imperm Pipe Pipe Orifice Number Area Diam Length Diameter NOTES 1. Call Engineering Division (771-32021 for prebackfill and final inspections. 2. Responsibility for operation and maintenance of drainage systems on private property is the resDonsibility of the,property owner(s). Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times. 1 1/2" CL. 13 A5FHALT OVERLAY FROM CENTER- LINE TO NEW CUR13 \ ,5X1Sr11Yd- NEW C Rk-�) 7- Foo r7 7-o7;44 --r 3coo S4�, ,c�_r CON-rROL CArC" PIC -To 0LTTLJE_r SYSTEM CROSS SECTION 8 . IP F*VSR4_.. 12" GIVIP (13Y OTHER5 - 5EE ERICH 0. TIETZE & A550C., INC. PLAN OF 9191 5UL3MITTED FOP, THE PROPO5E1) FOUR UNIT APT. PUE NORTH OF 505 PROJECT) G13 TYPE 1 (13Y OTHER5) WALNUT 57-REE-F EVA AWk � _*SFF CPOss SA5a"rloll . . . . . . . . . . . . I . 1110 . . . . . 09 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . F G L 103 . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . \ . . . . . . . . . . . . . . . . . . . . . . . . 110 107 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109 10(5 . . . . . . . . . . . . . . . . . . . 105 - - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...... . . . . . . . . . . . . . . . . . . . . C5#3 , , " , , * - - - I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108 . . . . . . . . - - - - - - - - - - - - - - - 104 . . . . . . . . . . . . . . . . . . . - - - - - - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . �A .. . . . . . #4: 1 . ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RE.100-17 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IE 95.58 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . ............................................... . . . . . . . . . . . . 107 ... . . . . . . . . . . . . . . . . . . . . . . . 106 1015 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KE,,99.25 ........................... ................ ................ .......... . . . . . . . . .. ........ 105 1 2 0Z . . . . . . . . . . . . . . . . . . . 101 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IE 67.67 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................. . . . 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104 . . . . . . . . . . . . . . . . . C13 #1 . . . . . . 100 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ;r . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . \ - - - 103 . . . . . . . . . . . . . . . . . K E 107.6-7 - 102 9C. . . . . . . ...................... 95 . . . . . . . . . . ... . . . ... ................................. . . . . ..... ... ............... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................... . . . . . . . . . . . . . . . 1E 105.657 * 101 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................... ... C . . . . . . . . . . . 100 97 . . . . . . . . . . . . . . . . . . . 9e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .#2 .......... ...................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . K.E. 108.00 . . . . . . . . . . . . . . . . . . . . . . . 99 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . IE 10403 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95 . . . . . . . . . I ............................................................. (ORIFICE PIA --- -3-14"y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97 . . . . . . . . . . . . . . . . . . . . . . . . 96 f C� k_-/Y5TEM CKO,55-5ECTION L 10' 0"Irftz- -/'1 7 IN, �-: tnN7Eje)19t 77147- N /2 /9DS ,5cH qo p.d.o /60 'P51 5D4 3 5- �1- 5 id _36 3 1 PU C 'V 'ED - 7" �E4i]Ll I RLE