Loading...
509 9TH AVE N.PDFiiiiii lill 11 9873 509 9TH AVE N ADDR1ESS: AJ TAX AC�,-.',"-'Lj'NT/PARCEL NUMBER:— Lo .3 4? 010 BUILDING PERMIT (NEW STRUCTURE): 0/4/0 COVENANTS (RECORDED) FOR: CRITICAL AREAS DETERMINATION: F] Conditional Waiver Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED:--�q PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR:Wt-0tW Vkh PERMITS (OTHER PLANNING DATA CHECKLIST DATED: /1/6/09 SCALED PLOT PLAN DATED: f SEWER LID FEE $: SHORT PLAT FILE: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED: I STREET USE / ENCROACHMENT PERMIT WATER METER TAP CARD DATED: LID #: LOT: BLOCK: IQ cJ LATEMP\DST's\Forms\Street File Cheeklist.doc RE.SUB b JAW i-431 ;T n 2- a 7 f- 01(f c 0 v D�Q . peQ Eric Thuesen Homes LLC- Scale r =20" AA� rcj-AdtCJA� sM 9P Ave N. Ii0-00 Edmonds, WA. 98020 BUIL U CRY OF EDIAONDS- % APAIOVEU AS NOTED Al BffiENGLNEE81 19,786 SF D Datf V at 27MAMSM Col. V V- 4F M to Id 5C V 4a k L�s e- Q1% . ........ 0 0. M 0 VIV proposed Hot Tub .8xI0 > 10- t . CL -t A mpe �i&ili Suifice—t"i "*-, N. : - \ -% Existing Residence Pad 2815's.f. (bu 2008 -ExistingGarage 424sf. (built2OO8) Existing Deck: 144 sf. (built 2008) - Existing Covered Porch 34 s.f. (built 2008) Existing Driveway 1067 s.f. (built 2008) Existing Caban'a' 427 s.f. (built 2013) Proposed Hot Tub and walkway 272 s.f.' T^I-%I rnwar2fr= F, 0 '� 0 South hot tub wall shall be set back 10' from south property line. 15 t 0 2-0 (3 ((-7_S-- Zone g�— 1-2- Comer Flag_2<- Setbacks ReQuired Actual 0 at Ffont /,j __ 10 10 t S es —LO- 16 - h -7 LR to 75-47— 0 /0 He6ji 'wq: Per aCDC I 66.20.04O.C. the hot tub patio surround rnay extend 3.33' into the required 10' setback /3 distance of the required I 0� setback or 3,33') Non -retaining wall/fence shall be no greater than 6' in height from average original grade to the top of the fence OVED BY PLAN NG t -2-7 N I* City of Edmonds 1$ Critical Area Notice of Decision Applicant: Vve-seA Property Owner: Critical Area File #.- CIM 70 o 100 6 -7 Pen -nit Number: dt d -2-0/ 3- (2j- Site Location: CI 7 -o� A-J� /u/ Parcel Number: -Z -7 o3 2 100 Z �- /,�,c Project Descriptio n: - �- �,6 a i*n Am ct " " "( )-a-Z 5 � 11 ?0/fc� F-I Conditional Waiver. No critical area report is required for the project describe8 above. IV71 (3-/ . 7 0 I . There will be no alteration of a Critical Area or its required buffer. eocl&6p� :3 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, angor 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. F-I Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. Z7Critical Area Report Required'. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I . The proposal minimizes the impact on critical areas in accordance with ECDC 23.40-.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40. 110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and - 6. _,�L The proposal is consistent with other applicable regulations and standards. F-1 Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations.. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). 4(c/gs , LUI\ Reviewer 4-- `9 / Signature -7 /1 Y Date' Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 PLANNING Pull AP�,80'vED h- M — = r C) 0 ck=M zz 7757. 1--i m co Co o, M .m cn, ',/E-4,09,34� 1� 41 as all IA "Wo 'aims `7 �vp �o ON %* I I 1 1 0.0 00. 00 . . PZ ob 40 .4� 0;0" m vp #-- fell %I W, sil- �..Jp / I !Olt Nft% I to% goof Of wow ww-- 40 10 I , '. . . AF I P Col. z00, EXISTING RESIDENCE 00 R,14ER7 it + Z-:as air fD WR \A7 7, Pil�. Ar)Q M. 4 177 R CK INTERCEPTOR TRENCH 5� TO EX. INLET PIPE bc N 51 53' /E-t409-34,b­` 44 7-- ell e AQ 10' TOE Of/� El __J -�47_ — -- — — — — — — — — — — — — — — — 4=�S OPE AR OPE -, �71 41 .1z Ln 6\ 710 -k arc: J )0 BUILD 00 1 it, 0 1 t LOT 2 EX SIDE X V�2 t - I SEWER STUB 70 C00 DMotj J N-� INV=98.90 RIT J FUTURE FNDTN 17-4- F r- 9 WALL )r F 0 .00 M X4 ROVEMENTS SEE 'd-"G ENG.',�o 'z M I EXISTING !N WA4 SECXO� RESIDENCE n 41CKENE� EDGE TEM IF PTABLE TIGHP-1114E It mATEPAAL vi 0 6 1 _J. F�"ER/Y f R 35 ILn Co & QH 40 kii- 12' 3' HANC Ur S_ I DEC _.r 115.017( // YJ EX. CB 2 S7—'�—r—EX—C TOP=101.9 3 TOP,= 10.50 INV.=93.00 ADJUST RIM INV.= 6.50 TO 102.60 S_ ILITY EASEMENT ON 110.0±EG E TO BENEFIT LOTS 1,2 & 105.OEG MG.' REMOVEE) )INS STAIR LAN NJ / —SD D/ _J _J I S_ S EX,/.SIDE SWR 10' L CO _x )y ro L21 DEG 11 /3q\ 4 0 9. .1 Ejr4� SUB 2.OFG Qr .0 MAR 30 20 3 F.I re, lz� 111� STREET FILE cy 3 ;& BUILDING VE—PAITIMEN' T S!' OF EDMONDS ADJUS SD AS 1_70EU 20' UTILITY EASEMENT FOR WALL Line Type Area (square feet) ON LOT 2 TO BENEFIT LOT 1 1 1 Non -Regulated V Q PI AN ING Zone Comer Fla Exempt Regulated WORM 107.0±EGE Setbacks -,guired Actu WEST WALL Replaced -Z'—+ 73 APPROVED Fr' ENGIN T EX. LANUI—NG Front _iUy_L0_ jo�110* 3. New (Post 1977) 44 4 444 4 4 Total Regulated Impervious Area -r* far"__ INSPECTION'S REQD. to 4. SE VER '7� 17112- Sides CALL 425-771-0220 pa. tr4a Real- 6 Mitigation required if in excess of 2000sf Date, 5. Total Area Mitigated by E3dsdng Stormwater Management System(s) Other -A r-) 36 35 34 33 6. Regulated Area Not Yet Mitigated C- V Per ECb(— fe-5 7. Area Proposed Ao be Mitigated by Low Impact Development Techniques RES1% AACtA/ tricrOAJI 9.;03 -1AAx1AA.V#1 8. Area Proposed to be Mitigated through Conventional SWM Techniques RESUB MAY 14 2012 V IT 4017 *Detention waiver approved by Don Fien'e 7/17/07 MAR 3 0 2012 BUILDING DEP�Rc�-MENT Refer to S-05-09. Discharge directly into the regional CITY OF EbMONDS BUILDING DEPARf-MENT OWNER/CONTRA(I%PTOR IS RESPONSIBLE Detention fa cility just west of the site which discharges CITY OF EDMONDS FOR EROSION CQNTROL AND DAMAGE Directly to Puget Sound. -BLD 2-o I (- C) -7 T�_ x WALL NDINU 4 00 7' b4 001 sq lop Jot 10, ow I-e Om: LAJ < LLU A w CD 7z 3 z: 1 3 uj LU 0 a- CD zo M_ 0 9p. `4? V C\.? cu_ (Do 40ir 10 AP D BY PLANNING Zone 15 Corner Flag_��_ P (3112--- 1 Setbacks Actual e-111,ew Fron Sides W iv Rear Other Hei t 16 City of Edmonds 0 Critical Area Notice of Decision Applicant: Property Owner: Ue's e-k— Critical Area File # . CeA Permit Number: Zo 10 -7 -7-S— Site Location: 50 � � IV; SI �,+Farcel Nvinber: 'AJ, - /V 770-3-2-qOO'L -)0/ 12.70Z2VOoZZ-S-100 Project Description: Fe lyVif-L7\�- di(-f eirc(fa Coad )� ccd�a F� Conditional Waiver. No critical area report is required for the project described above. There will be no alteration of a�Critical Area or its required buffer. The proposal is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. The proposal is exempt pursuant to ECDC 23.40.230. F-I Erosion Hazard. Pro9ect is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. Critical Area Report Require d. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40-.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4, Any alterations permitted to the critical area are mitigated in accordancew.ith ECDC 23.40. 110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Conditions. Criti cal Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). C Date Reviewer Signaturne Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 12/16/2010 PLANNING DATA SINGLE FAMILY RESIDENTIAL 11 S TREE T FILE_ Name: S �A CID z 1 -7 Q 3-2- -100 5 10 - 0 ) Date: 2 0 (1 12 IL 14-, /tj Site Address: --- Plan Check 2,::�'(t! Project Description: Lo, ct,,&, Reduced Site Plan Provided: (0/ NO) -1 Zoning: Map Page: Corner Lot: (YES 09 1 Flag Lot: ((LE! Critical Areas Determination 9:Z0C)l 10 /11, 7- kff-Study Required Waiver SEPA Determination: VExempt El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Regulted S?tbacks Street: o Side- 1 5 /0 Rear: Actual Setback5 Street: z-3 Side: Side: /0 M Detached Structures: ok,- ELRockeries: UAXA Fences/Trellises: Bay Windows/Projecting Modulation: AKLStairs/Deck: Hefght Datum Point: 410 V Datum Elevation: f Maximum Height Allowed: ctual Height:4#.-�� q- 7_5�co 1,60, Other Parking Required: /61'k- Parking Provided: /V74 Lot Area: 11-736* Maximum Lot Coverage: 35% Proposed Lot Coverage Calculations: kjc/st, vlqie,� 6- 9 cq,6ao,4 4L 6 &,o 6 ADU Created: (YES /tQ) Subdi si( Legal Nonconforming Land Use Determination [ssued: �Y'Es comments I/ V VU L-CAt t 01 iL�Plan Review By: 7 It -7 /(L- ,, )"", .,,-,,6.doc Z- D/ 40. 0 City of Edmonds 41 Critical Area Notice of Decision Applicant: —T� V'e�C& Property Owner: �-Ht ueSeA Critical Area File #: 7-00(-o66-7 Permit Number: 86 0 — 2-0 f 0 7 -7E- Site Location: 7 ffue- Al Parcel Number: -2::3 15 75 =t Project Descriptio n: F-� Conditional Waiver. No critical area report is required for the project described above. There will be no alteration of a -Critical Area or its required buffer. The proposal is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. The proposal is exempt pursuant to ECDC 23.40.230. Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. �f—Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: 1. The proposal minimizes the impact on critical areas in accordance with ECDC 23.40,120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance w,ith ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria ih ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. F-I Conditions. Criti cal Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). '7611" mpf� Reviewer Signature*-' Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 1206/2010 CITY OF EDMONDS 121 51h Avenue North, Edmonds WA 98020 Phone: 425.771.0220 * Fax: 425.771.0221 9 Web: www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT 9 PLANNING DIVISION J 12 C. I s 9 V Critical Areas. ReconnaissaInce Report Update Critical Areas File Number Determination -Site Location Tax Account Number Property Owner Applicant Critical Areas Present CRA20010067 Study Required th .5-69 9,-. A ven.ue'North -L -7 0-S-2140 0 L Eric Thuesen 7/11JA -Z- NIA 2 Geologically Hazardous Areas 2 Erosion Hazard Area 2 Landslide Hazard Area THIS PARCEL WAS PREVIOUSLY IDENTIFIED AS A'STEEP SLOPE HAZARD AREA' IN 2001. HOWEVER, THE CRITICAL AREAS CODE UPDATE OF 2005 REQUIRES REASSESSMENT OF THE ORIGINAL DETERMINATION. Site Description During review and inspection of the subject site, it was found that the site may contain (or be adjacent to) critical areas, including Geologically Hazardous Areas (Erosion and/or Landslide Hazard Areas), pursuant to Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other geological events. They pose a threat to the health and safety of citizens when incompatible development is sited in areas of significant hazard. Such incompatible development may not only place itself at risk; but also may increase the hazard to surrounding development and use. Cited sections of the Edmonds Community Development Code can be found on the City of Edmonds website at www.edmondswa.gov. th The associated LiDAR map indicates that the parcel generally slopes down from east to west toward 8 Avenue. The eastern portion of the lot where the existing h ouse is located is more level but the grade falls. away steeply to the west of the house. This portion of the slope exceeds 40% (at approximately 50%) while portions of the eastern area range from 15-25%. Soils on the parcel are identified primarily as Alderwood Urban land compl ex (8% - 15% slope). As a result, the slopes in excess of 15�o' are classified as a potential erosion hazards and the portion that exceeds 40% is a potential landslide hazard area. Allowed Activities & Exempt Proposals Certain activities are allowed in or near critical area buffers as specified irf ECDC 23.40.220. Similarly, certain development proposal s may be exempt from Critical Areas requirements (ECDC 23.40.230). If you have any questions about whether your proposed development qualifies as an allowed or exempt activity, please contact a Plannerfor more information. General Report Requirements Critical Areas Reports identify, classify and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. if a specific development proposal results in an alteration to a critical area the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal.to complete the study. You may also choose submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas which are listed in ECDC 23.40.09O.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on ho wto complete a critical areas study and an approved list of consultants that you may choose from -You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. Erosion Hazard Areas Erosion Hazard areas include Alderwood and Everett series soils on slopes of 1 ' 5 percent or greater, among others. Landslide Hazard Areas are further defined in ECDC 23.80.020.A. In addition to the general requirements for Critical Areas reports referenced above, specific Critical Area report requirements for Erosion Hazard Areas (which are one of the Geologically Hazardous Areas) are provided in ECDC 23.80.050. Note that Stable Erosion Hazard Areas may have limited report requirements at the director's discretion. At a minimum an erosion and sediment control plan prepared in compliance with, the requirements in ECDC Chapter 18.30 shall be required. Development is restricted within an Erosion Hazard Area and must meet additional criteria. For erosion hazard areas with suitable slope stability, an erosion and sediment control plan prepared in compliance ECDC 18.30 will be considered to meet the Critical Areas "Study Required" determination. The determination of "suitable slope sta i bility" will be made by both the Planning and Engineering divisions of the City of Edmonds. In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed Geotechnical Engineer -or other qualified, professional. Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. Report requirements are given in ECDC 23.80.050, and more generally in ECDC 23.40.09O.D. Development standards are given in ECDC 23.80.060 and 23.80.070. Page 12 Landslide Hazard- Areas Development is restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. Geologically hazardous areas include areas susceptible to erosion, land sliding, earthquake, or other geological events. They pose a threat to the health and safety of citizens when incompatible development is sited in areas of significant haza rd. Such incompatible development may not only place itself at risk, but also may increase the hazard to surrounding development and use. The criteria that are applied depend on the amount that the buffer is reduced. The bu ffer can be reduced to a minimum of ten (10) feet (with an additional 15' building setback per ECDC 23.40.280).if a report is prepared that meets the standards listed in ECDC 23.80.050). The alteration must also meet the requirements listed ECDC 23.80.060. In addition, proposals to reduce the buffer to less than ten (10) feet must comply with the design standards listed in ECDC 23.80.070.A.3. Development is.restricted within a Landslide Hazard Area and its buffer. Projects that will intrude into these areas will require a report by a licensed Geotechnical Engineer. Determination: Study Required This review applies to the entire subject parcel. Depending on the location and project proposed relative to the identified criticalareas, certain studies and reports may be required. Please contact the Planning Division at- 425.771.0220 if and when you have a specific development proposalfor this site in order to discuss the various permits. that will be required. Mike Clugston, Associate Planner - Mk' �� April 6, 2012 Name, Title SignatuW Date Page 13 'X 10� 4" C/O, 2'FROM HOUSE ll� 4" SDR35, 2'DEEP 15091 STREET FILE I Z.) 4,� /3'DEEP 0 STORM LINE NOTICE: NO WARRANTY OF ACCURACY. The information shown on the attached map was compiled for use by the City of Edmonds, its employees and consultants. The City of Edmonds does not warrant the accuracy of anything set forth on the map. Any person or entity requesting a copy should conduct an independent inquiry regarding the information shown on the map, including, but.not limited to, the location of any sewer stub shown. Such sewer stubs may or may not exist and may or may not exist at the location shown. Neither the City of Edmonds nor its employees or officers shall be liable for the information given on this map, nor for any oral representation provided based upon said map. 0 F E.D* CITY OF 0 � I ADDRESS: SHED REAR OF HOUSE 8- 4 25' EDMONDS SIDE SEWER AS-BUIJ PERMIT Q 0), 509 9TH AVE N No- ENG 20060235 CONTRACTOR: HOMEOWNER: CUSTOM HOMES I ERIC THEUSEN DATEINSPECTED: INSPECTED BY: DATE DRAWN: 5/23/06 1 E. SIBREL 1 10/16/06 NTS ABILA/SHIU City of Edmonds Critical Areas Determination Project Specific Waiver of WETLAND STUDY Requirement Determination CA-01-067 Applicant: Eric Thuesen Project Name: I Thuesen NSFR I Permit Number: I PC-04-476 I Site Location: 1 509 91h Ave. N. I Property Tax Acct #: 1 242703220600 1 Project Description: Construct one new single-family residence and one new detached garage. Wetland study requirement waived due to distance from wetland. Waiver Criteria (all criteria must be found to apply): X There will be no alteration of the Critical Area or its required buffers; X The development proposal will not impact the Critical Area in a manner contrary to the goals, purposes, objectives and requirements of the Critical Areas ordinance; X The development proposal meets the minimum standards of the Critical Areas ordinance; X The above findings are based on the following conditions of approval: This conditional waiver is only for the construction of one new single-family residence and one new detached garage as described above and shown on the attached site plan. Any additional work and future projects will require a separate determination regarding study requirements. 2. A building permit is required for all work. Based on the above findings and conditions, the requirement for a Critical Areas Study associated with this development permit is hereby Waived, as authorized by Chapter 20.15B.040 (A) of the Edmonds Community Development Code. Ross C. Beckley � �& / November 15, 2004 Name Signature 4� Date NORTH 5CALE: V 2CY-CY' Cv 4d 9VI Z c �PLOT PLAJ,4 MAXIMUM 13UILDING HEIGHT5: HOU!5E A 152.8' 165.4' 144.4' 149.9' 612.5 /4 = 15-3.12 + 25'= 176-121.5= MAX ROOF ELEV. MAXIMUM DUILDING HEiGHT6: DETACHED GARAGE; � E 1 (53 5 F 1 (538. 0' �� 165.4' H 161.7 655.6 /4 =164.65' + 15'= 179.65'= MAX ROOF ELEV. 6 00 IcIt (fi > < c M ct qo S - 113 - 2 a w 1A N 89-51*53' E lool/ 150-- - 1*1t.F ZA 49-34* X I - / / / , o;, A XA -A vi 31.937 S.F­ N Z3'1 5 00 E 12.000 S.F.. —APPROXlaATE LO�AVON ',��4o% SLOPE ARGA K31 'A CATERGORY 2 WETLAND 15' _DUILDING SETBACK loor EWICDING SLrTBAC*,'(e 11410 15 VER C FROM WE"D BU 0 Cz Z� oll IT7.v AU-EY N I x E3 L. c K 2 36 31 36 35 34 33 .32 31 30 20 213 21 26 26 24 23 -DALEY STREET Dennis M. Bruce,' RL. M.S.C.E., M.B.A. Gectechnicall/Clvd Engineer OCT - 8 2004 PERA41T COL/NTER Mr. & Mrs. Wolgamott 503 9h Ave. N Edmonds, WA 98020 October 24, 2001 Subject: Preliminary Geotechnical Evaluation / Wolgamott Property 503 9hAve. N, Edmonds, Washington I . This engineering report presents the results of a preliminary geotechnical evaluation of the Wolgamott property located at 503 9th Ave. N, Edmonds, Washington. This evaluation was made at the request of owners and real estate broker, Dan Tomasek. REFERENCES: Property map and slope study by LSA dated May 23, 2001 Site photographs BACKGROUND: It is understood that the total overall property contains the existing Wolgamott residence (503 9th Ave. N) as well as a long, rectangular piece of property that runs westerly down slope to 8th Ave. N (see photographs). It is understood that the existing residence is to remain, with three (3) future single-family residences to be built on the lower (westerly) property. The lower piece of property (containing the future 3 new residences) is approximately 110 feet wide by approximately 400 feet long. Currently, this lower piece of property contains a historic tennis court, small concrete access drive, and minor landscaping. The remainder of the lower property contains mature trees, brush and grasses. The primary geotechnical feature affecting development is slopes. The southeast comer of the lower property contains a high point (elevation approximately 169). The western edge of the property (abutting 8th Ave. N) contains a low spot (approximately elevation 93). SOILS - FOUNDATIONS - SITE DEVELOPMENT - INSPECTION - DRAINAGE - DESIGN& PERMIT - LEGAL P.O. Box 55502 - Shoreline, Washington 98155 - (206) 546-9217 - FAX 546-8442 r Mr. & Mrs. Wolgamo October 24, 2001 Page 2 PRELIMINARY EVALUATION: This engineer performed an initial visual geotechnical evaluation of the property on August 18, 2001 and subsequent inspection using a hand soil probe on September 27,2001. Visual evaluation of the property revealed no evidence of any geotechnical distress: no slides, no sloughing, no soil tension cracks nor any evidence of significant erosional degradation. It is understood that one new proposed residence will occupy the portion of the property where the current tennis court exists. The tennis court reveals no evidence of any geotechnical distress (other than years of non-use and slight slab cracking). Obviously, the tennis court area provides a relatively flat house location site. The use of a hand soil probe verified relatively shallow (less than 18 inches) dense, sub grade soils. It is understood that the remaining two future residences will be accessed through the bottom (off 8 th Ave. N). Walking / exploring the lower portions of the th property did verify the topographic map indications of less steep topography towards 8 Ave. N. The use of a hand soil probe verified the presence of dense, native sub grade soils capable of providing a minimum of 2,000 p.s.f. bearing capacity. CONCLUSIONS / RECOMMENDATIONS: Based on the findings of this engineer's preliminary geotechnical evaluation and' experience with nearby properties, the following are concluded and recommended: The proposed 3'future single-family residences on the lower portion of the Wolgamott property are geotechnically viable. The slopes present do not pose adverse geotechnical impacts to the development of the proposed 3 houses. Additional specific geotechnical investigations (test pits, soil analysis, foundation recommendations, etc.) are required to proceed with development of the proposed 3 houses. This engineer observed no adverse drainage or water conditions precluding the proposed development of 3 new houses. Nov 15 04 013:31a- D-.- Bruce, P.E. 206-549-L8442 P. I Dennis M. Bruce, P.E.' A4.S.C.E., M.B.A. Geotechnical /Civil Engineir November 12, 2004 City of Edmonds cJo Eric Thuesen Custom Home 18333 Be PL W. Edmonds, WA 98026 Subject: Geotechnical Review — Site Plan Proposed New Residence SW 99h Ave. North Edmonds, Washington This engineering report presents the results of a geotechnical review o property and site plan for the proposed new residenoe by Thuesen Cust: Homes. REFERENCES: • Preliminary geotechnical report by D. Bruce, P.E. October 21, 2001 • Soil test pit photographs dated September 4, 2002 • Site Plan for proposed for new residence by Thuesen homes BACKGROUND: This engineer has provided geotechnical services for potential buyers and developers of the overall property at 503 9th Ave. N. The soil test pits where dug on September 4, 2002 in the vicinity of the proposed new home by Thuesen Custom Homes. This engineer vertfied very dense native sands with gravels at shallow footing depths. PROPOSED NEW.RESIDENCE: This engineer has reviewed the attached sit plan by Thuesen Custom Homes for the new residence to be located in the aTennis courf zone. The topography for the site has been performed by LSA and defines the top-of4ope. See survey map. SOILS - FOUNDA 77ONS - SITE DEVa OPMEW - INSPEC77ON - DRAINAGE - OESION J PERMIT - LEGAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 - FAX (206) 546-8442 Nov 15 04 08:31a City of Edmonds 11-9-04 Page 2 of 2 D. Bruce, P.E. 206-546-U44e P 0 The proposed site plan for the now residence will result in the foundation to be set back 25 feet from the top -of -steep slope boundary. The reduction of the buffer from 50 feet to 25 feet will have no adverse impact on the site, the public, or any private party, gggiect to onsite geotechnical inspections by this engineer. SUMMARY: The proposed new residence and location per sit e plan ( with 25 foot set back from top of slope ) is geotechnically ppproved subject to onsite - inspections bv this engineer. if there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. Geotechnical / Civil Engineer DMB:Imb fem-as -afff—z n6z] a Mr. & Mrs. Wolgamott October 24, 2001 Page 3 If there are any questions, do not hesitate to call. I EXPIRES DMB:abj Dennis M. Bruce, P.E. Geotechnical / Civil Engineer 09 IVII 5. vvoigamott October 24, 2001 -Page 2 0 PRELIMINARY EVALUATION: This engineer performed an initial visual geotechnical evaluation of th I e property on August 18, 2001 and subsequent inspection using a hand soil probe on September 27, 2001. Visual evaluation of the property revealed no evidence of any geotechnical distress: no slides, no sloughing, no soil tension cracks nor any evidence of significant erosional degradation. It is understood that one new proposed residence will occupy the portion *of the property where the current tennis court exists. The tennis court. reveals no evidence of any geotechnical distress (other than years of non-use and slight slab cracking). Obviously, the tennis court area provides a relatively flat house location site. The use of a hand soil probe verified relatively shallow (less than 18 inches) dense, sub grade soils. It is understood that the remaining two future residences will be accessed through the bottom (off 8th Ave. N). Walking / exploring the lower portions of the property did verity the topographic map indications of less steep topography towards 8th Ave. N. The use of a hand soil probe verified the presence of dense, native sub grade soils capable of providing a minimum of 2,000 p.s.f. bearing capa * city. CONCLUSIONS / RECOMMENDATIONS: Based on the findings of this engineer's preliminary geotechnical evaluation and experience with nearby properties, the following are concluded and recommended: The proposed 3 future single-family residences on the lower portion of the Wolgamott property are -Geotechnically viable. The slopes present do not pose adverse geotechnical impacts to the development of the proposed 3 houses. Additional specific geotechnical investigations (test pits, soil analysis, foundation recommendations, etc.) are reguired to proceed with development of the proposed 3 houses. This engineer observed no adverse drainage or water conditions precluding the proposed development of 3 new houses. Mr. & Mrs. Wolgamott October 24, 2001 *Page 3 If there are any questions, do not hesitate to call. I EXPIRES 1ZW -A 00 1 1 DMB:abj Dennis M. Bruce, P.E. Geotechpical / Civil Engineer Witical Areas Checklis-0 CA File No:— Cq -7 Site hiformation (soils/ topography/ hydrology/ vege& n) Site Address/ Location: J-�Vi�_Xk 2. Property Tax Account Number: 3. Approximate Site Size (acres or square feet): 4. Is this site currently developed? _ yes; no. if 'yes; how is site developed? 5. Describe the general site topography. Check all that apply. Flat: less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more th an 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: Approx. Depth: 7. Site contains areas of seasonal standing water: - NO Approx. Depth: What season(s) of the year? 8. Site is in the floodway nC floodplain _ of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawnshrubs etc) 11. Obvious wetland is present on site: V,�,D For City Staff Use Only 1. Plan Check Number, if applicable? 2. Site is Zoned?. P� 3. SCS mapped soil type(s)? !-%qjx:-,",j 4. Critical Areas inventory or C.A. map indicates Critical Area on site? qp. 5. Site within designated earth subsidence landslide hazard area? DETERMINATION SrUDY REQUIRED WAIVER Reviewed b]r. C) Date: Critical Areas Checklist.doc/3.19.2001 City of Edmonds Critical Areas Determination Applicant: Dan Tomasek for Fred A. Determination #: CA-01-79 Wolgomatt (Owner) Project Name: I Permit Number: I Site Location: Lot directly west of 503 9 th Property Tax Acet #: 2470 322 060 00 Ave. N. Project Description: Non -Project Specific Determination: Study Required: During review and inspection of the subject site, it was found that the site appears to contain a critical area, including a Steep Slope Hazard Area pursuant to Chapter 20.15B of the Edmonds Community Development Code (ECDC). Based on this finding, prior to submission of any development permit, you will be required satisfy the requirements of ECDC 20.15B by completing a Critical Areas Study consisting of the following: Steep Slope Hazard Area Delineation ReQuirements: To deten-nine if a Steep Slope Hazard Area does exist, a topographic survey prepared by a Licensed Land Surveyor delineating Steep Slope Hazard Areas must be completed. Any slope of 40% or more with at least 20 feet of rise will be classified as a Steep Slope Hazard Area. A 50- foot buffer is required from both the top and toe of the slope. A 15-foot building setback is required from the 50-foot buffer. The top and toe of the slope as well as the buffer and building setbacks should be clearly identified on the survey. For development of any kind which is proposed within the critical area, 50-foot buffer or 15-foot buffer setback, it must be shown that the development will not adversely impact the Critical Area or its buffer, by doing one or possibly both of the following depending on the outcome of the study: For development proposals which will occur within the 50-foot buffer, but no closer than 10 feet from the top or toe of the slope, the 50-foot buffer requirement may be reduced to 10 feet if a study is completed by a licensed geologist or geotechnical engineer which clearly demonstrates that the proposed buffer alteration will have no adverse impact upon the site, the public or any private party. 2. If development must occur within the critical area, buffer, and/or buffer setback, and is not identified as exempt per ECDC Chapter 20.15B, a Reasonable Use Exception and Variance must be obtained pursuant to ECDC 20.15B. 170A and 20.1513.040C. If the results of the Critical Areas Study detennine that the lot may not be developed, the applicant may apply for a Reasonable Use Exception and Variance pursuant to ECDC 20.15B. 170(A) and 20.15B.040(C)). If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located on the site, they may submit their proposal to the Planning Department for review. If the Planning Department rinds that the proposed development permit will not adversely impact a Critical Areas or its buffers, a conditional waiver may be issued on a project by project basis. Please call me at (425) 771-0220 if you have any questions. Name Signature Date Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.cl.edmonds.wa.us. F� f�� 5CAI E:1'0201-0" 110-00, cr 0 .75; 1, IN \CY 4 WATER & 84ER INSPEO-TIO14S REUR. " '>C -3� G�� 425-771��2, EXT. I PLOT PLAN APPROVED AS NOTED BY Date: 14 LZ z_r to (Vi **,�, 9 '1 lk� Mu C;rAl P- Ill. : , ..N I I , '\ I /, ,'% C2""SAJ r -f" 3446 /:Re IN 410 -:'.-26 3 40 ALL EXPOtD SU�FACES T'6 BE COVERID WITFilN 2 DAYS Ir GRADIW& ? N\O OWNF TRAC111OR IS RESPO�EgWT�oup,5 @4 2' IN -TEVA L5 FO, H/COjgk N CONTROL AND DAMAGE lew- s (ot\j 61N)TWOL (f-gF-ft, WC, /6 IV, ILE APpj�OVED: AS NOTED �13NY—E�NZ 'EURING Date: 9 NORTH Asr I it 14 ,NJ I fo IL N 40 DGRADIWGr R 5 M11 F- \I N6V 12 2004 CONTOUR5 5CALE: ill = 2o--al PLAW) Z'INTEVAL5 PERMIT COUNTER CITY Copy Se o K�k C— 0, Pms, A c (L, CA-) c 7 9N -S It . 2-0 10 lz;t c-, A r7 b (t-, 3001b o7-7 ci y, -7(p S Y- �A ...NEU S CU5T4,M"j,,i,,ti?,g f7srJAL-GeLA0;; S'r*,,ET FILE -co Thoew-n 15 -t�wolcs. Site- M" cx,,q--r(oQ 67 W6 0 co Top Fla Vi 04 VP "'p. " Ic MAO % mr IJ6 TO % %b c'o, NN % % % \ 1116 IN . roo Ns. Too . \1 -4 OCT 2004 N--. MWIT COUNTER ..... ...... ............... ................ ............. ..... .. ..... LL, co ........... .. .......... ....... ......... .... ....... . .. .... ..... .. ................... .......... ......... ... cr- Lu ........ .. .. ........ . tA 'Zv 22� s ...... ..... ............ I; ip O-L ..... . ...... .......... .......... ...... ... ........... ........ ... ....... i t o—m— Ilk ......... amp.1, 01 h - - --"-w I %,; I %ff "J , )T.. -Ay AA 04!r LEFT 'E")JOE ELEVATIC N cr-I LU C) Ul cc w CD G! Ll I rl� 706 14,1 1429 1427 ;114 1428 4U 428 1421 1 140 z 1422 714 737 1402 691 725 "40 735 .1Z all 821 1 831 727 929 81 UGET WAY 9" 723 814 906 917 720 742 7SO 1212 1331 1333 PLI( z LI r- 911 912 w 1228 > 710 1205 < 903 842 834 96 721 co 718 [�-� I HINDL Y 827 am 828 M 709 8 12 0 . . .1 840 $44 902 731 741 751 40 I goo 816 818 a I BROOKIVERE am 845 741 750 Z BROOKME DR oil 731 CwC > 846 730 1031 0 1030 < 1035 w 1025 723 IM l' 1021 W2 1020 715 tic 1033 1015 1017 1019 0 209 0 Ir 101 1011 V 743 I CASPERS ST a 324 342 350 706 > — <: 928 616 620 633 623 652 654 656 907 909 912 g 621 625 627 1 We 61S 8210 724 736 860 914 1 630 632 634 825 611 4. 824 726 738 828 f, 910 :p I "be 613 6OWS Oi 611 615 17 0 so 607 619 817 730 z . . 9 i Ills 825 601 602 603 604 Soo SOB LU 7N 616 813 &IJ Edmonds 602 625 — -2 all 541 548 801 �7' Methodist sic 550 630 —, T — 376 729 728 Fel� 51 63S 536 720 612 628 721 725 rch 721 719 721 712 office z W, 5w 524 622 626 715 In 715 > 609 school < 620 807 702 T 623 667 770 Slo 619 621 625 627 SO4 502 615 Soundview Apartments 617 W2 702 647 426 601 614 609 804 814 "10 4 "is z - 0 612 w Bi le Holy Rosary 6w aw 810 w 643 1/1 > 603 School El < Libra ible 40 GLEN ST 620 524 1110 0: KO 528 529 428 A?a 410 owl 5oq 50 522 V23 655 657 771 DALEY ST aq 722 Dennis M. Bruce, P.E. M.S.C.E., M.B.A. Geotechnical /Civil Engineer &"FREET FILE January 13, 2005 City of Edmonds cto Eric Thuesen Custom Homes 18333 85h Pl. W Edmonds, WA 98026 coli Subject: Geotechnical and Drainage Evaluation — Design Criteria 509 9th Ave. N, Edmonds, Washington Proposed Two New Residences with Access This engineering report presents the results of a geotechnical evaluation of the property at 509 9th Ave. N, Edmonds, Washington. This evaluation was required due to owner / contractor concerns, as well as City of Edmonds requirements for steep -slope development. REFERENCES: * Site Plan and Topographic Survey by LSA * Proposed Two New Residence and Driveway Access Plans (furnished by 0 developer) D. Bruce, P.E. dated October 24, 2001 Preliminary Geotechnical Evaluation by Site photographs BACKGROUND: The overall property at 509 91h Ave. N (formerly known as the Wolgamoft ' property) is approximately 110 feet wide (along 9' Ave. N), and approximately 500 feet deep. The existing residence at 503 9th Ave. N (the Wolgamoft residence) is to remain. It is understood that property developer (Eric Thuesen) proposes to construct two new single-family residences down -slope (westerly) of the existing residence. One new residence will beconstructed in the area currently occupied by the historic tennis court. The other residence will be located westerly of the first residence. It is understood that driveway access will be from the north side of existing residence and allow access to each of the two new homes (see Project Plans). SOILS - FOUNDA 7"IONS SITE DEVELOPMENT - INSPECrYOV - DRAINAGE - DESIGN& PERMIT - LEGAL - - - .... -.^ -­ ­111 --- % - I.- City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 2 This engineer evaluated the ' overall property in 2001. Several prospective developers have looked at the property since that time. I As stated in the October 24, 2001 preliminary report, the pri�rary geotechnical feature affecting development are the slopes (see Topographic Ma' for specific slope P declinations). Visual observation during 2001 (as well as the past 3-1/2years) has revealed no evidence of any geotechnical distress: no slides, no sloughing, nosoil tension cracks, or any evidence of significant erosional degradation. This engineer understands that the lower portion of the over'all property (adjacent 8 th Ave. N) has been designated a,wetland zone (see Project Site Plan) EVALUATION: In order to augment the existing site geotechnical informatio I n, 2 soil test pits were dug by backhoe on September 4, 2002. i Recently, 4 soil test pits were dug by hand in the sloped por�ion of the property below proposed house No. 2. The recent.test holes were dug to assess the viability of on -site storm water infiltration. I The September 4, 2002 test pits were dug in the vicinity of H' ouse No. 1 (tennis court house) and revealed similar sub -grade conditions, namely: 0" to 6" Lawn, organics, roots, ai 6" to 4' (bottom of pits) Very dense sands with g No water was encountered in either of these two test pits remained vertical and stable. No sloughing or caving occurred. January 2005 test holes on slope. Five test holes were hand dug to approximately 3-foot d below proposed House No. 2. The findings of all 5 test holes r grade conditions, namely: organic silt vels I test pit walls 5 on the slope led similar sub- 0" to 6" Organics, roots, and fore9t duff 6" to 40" (bottom of holes) Dense sand. Relatively clean with fines (soil passing No. 200 sie I ve) estimated to be less than 10 percent City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 3 No water was encountered in any of the five test holes. All test hole walls remained vertical and stable. No sloughing or caving occurred. NOTE: See later section on drainage for results of infiltration test. CONCLUSIONS I RECOMMENDATIONS,: Based on the findings of this investigation, and experience with similar sites in the area, the property at 509 9th Ave. N, Edmonds, Washington is geotechnically approved for the proposed 2 new residences, subject to the following: Standard reinforced continuous and spread footings. Allowable bearing pressure: 2,000 p.s.f. 0 Equivalent fluid pressure of 35 p.c.f. is recommended for any retaining wall design provided drainage zone is inspected and verified by this engineer. 'For retaining wall design, use friction factor of 0.55 and passive pressure of 350 p.c.f. NOTE: It is understood that the driveway access will require a reinforced concrete retaining wall to provide support for the driveway. It is essential that the retaining wall foundation be founded on dense native sub -grade soils as verified by geotechnical inspections. Geotechnical inspections by this engineer prior to any foundation concrete placement. The proposed structures can be supported on conventional continuous and spread footings bearing on undisturbed native soils or on structural fill placed above native soils. See the later sub -section entitled General Earthwork and Structural Fill for structural fill placement and compaction recommendations. Continuous and individual spread footings should have minimum widths of eighteen (18) and twenty-four (24) I inches , respectively, and should be bottomed at least eighteen (18) inches be ow the lower adjacent finish ground surface. Depending on the final site grades, some over -excavation may be required below footings to expose competent native soils. Unless lean concrete is used to fill the over excavated hole, the width of the over -excavation at the bottom must be at least as wide as the sum of two times the depth of the over -excavation and the footing width. For example, an over -excavation extending two feet below the bottom of a three-foot wide footing must be at least seven feet wide at the base of the excavation. City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 4 Footings constructed according to the above recommendations may be designed for an allowable soil bearing pressure of two thousand (2,000) pounds per square foot (p.s.f.). A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that total post -construction settlement of footings founded on competent, native soils (or on structural fill up to five (5) feet in thickness) will be about one-half inch, with differential settlements on the order of one -quarter inch. Lateral loads due to wind or seismic forces may be resisted by friction between the foundations and the bearing soils, or by passive earth pressure acting on the vertical, embedded portions of the foundations. For the latter condition, the foundations must either be poured directly against undisturbed soil or the backfill placed around the outside of the foundation must be level structural fill. We recommend the following design values be used for the foundation's resistance to lateral loading: ParAmeter Design Value Coefficient of Friction 0.55 Passive Earth Pressure 350 p.c.f. Where: (1) p.c.f. is pounds per cubic foot. uted using the equivalent fluid density. (2) Passive earth pressure.is comp We recommend that a safety factor of at least 1.5 be used for design of the foundation's resistance to lateral loading. SLABS -ON -GRADE: Slab -on -grade floors may be supported'on undisturbed, competent native soils or on structural fill. The slabs may be supported on the existing soils provided ihese soils can be re -compacted prior to placement of the free -draining sand or gravel underneath the slab. This sand and gravel layer should be a minimum of four (4) inches thick. We also recommend using a vapor barrier such as 6-mil. plastic membrane beneath the slab with minimum overlaps of 12 inches for sealing purposes. PERMANENT FOUNDATION AND RETAINING WALLS: Retaining walls backfilled on one side only should be designed to resist lateral earth pressures imposed by the soils retained by these structures. The following City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 5 recommended design parameters are for walls less than twelve (12) feet in height, which restrain level backfill: Parameter Active Earth Pressure* Passive Earth Pressure Coefficient of Friction Soil Unit Weight Where: Design Value 35 p.c.f. 350 p.c.f. 0.55 125 p.c.f. (1) p.c.f. is pounds per cubic foot (2) Active and passive earth pressures are computed using equivalent fluid densities. For restrained walls which cannot defect at least 0.002 times the wall height, a uniform lateral pressure of one hundred (100 p.s.f. should be added to the active equivalent fluid pressure). The values given above are to be used for design of permanent foundation and retaining walls only. An appropriate safety factor should be applied when designing the walls. We recommend using a safety factor of at least 1.5 for overturning and sliding. The above design values do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the above lateral pressures. Also, if sloping backfill is desired behind the walls, then we will need to be given the wall dimensions and slope of the backfill in order to provide the appropriate design earth pressures. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of the wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. Placement and compaction of retaining wall backfill should be accomplished with hand -operated equipment. Retaining Wall Backfill Backfill placed within eighteen (18) inches of any retaining -or foundation walls should be free -draining structural fill containing no organics. This backfill should contain no more than five (5) percent silt or clay particles and have no particles grpater than City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 6 four (4) inches in diameter. The percentage of particles passing the No. 4 sieve should be between twenty-five (25) and seventy (70) percent. Due to their high silt content, if the native soils are used as backfill, a drainage composite, such as Mirafi and Enkadrain, should be placed against the retaining walls. The drainage composites should be hydraulically connected to the foundation drain system. The purpose of these backfill requirements is to assure that the design criteria for the retaining wall is not exceeded because of a build-up of hydrostatic pressure behind the wall. The subsection entitled Gene ructural- Fill contains recommendations regarding placement and compaction of structural fill behind retaining and foundation walls. EXCAVATION AND SLOPES: In no case should excavation slopes be greater than the limits specified in local, state and national government safety regulations. Temporary cuts up to a heig. ht of four (4) feet deep in unsaturated soils may be vertical. For temporary cuts having a height gr I eater than four (4) feet, the cut should have an inclination no steeper than 1: 1 (Horizontal:Vertical) from the top of the slope to the bottom of the excavation. Under specific recommendations by the geotechnical engineer, excavation cuts may be modified for site conditions. All permanent cuts into native soils should be inclined no steeper than 2:1 (H:V). Fill slopes should not exceed 2HAV. it is important to note that sands do cave suddenly, and without warning. The contractors should be made aware of this potential hazard. Water should not be allowed to flow uncontrolled over the top of any temporary or permanent slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation to reduce erosion and improve stability of the surficial layer of soil. DRAINAGE CONSIDERATIONS: Footing drains are recommended at the base of all footings and retaining walls. These drains should be surrounded by at least six (6) inches of one -inch -minus washed rock wrapped in non -woven geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At the highest point, the perforated pipe invert should be at least as low as the bottom of the footing and it should be sloped for drainage. Ali roof and surface water drains must be kept separate from the foundation drain system. No groundwater was observed in the September 2002 test pits or the January 2005 test holes. Seepaqe into the planned excavation is possible, and likely if excavation occurs during winter months, and if encd,untered should be drained away , French drains, or Oy.ppmping from the site by use of drainage ditches, perforated pipe City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 7 from sumps interconnected by shallow connector trenches at the bottom of the excavation. The excavation of the site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Any exposed slopes to be covered with plastic to minimize erosion. Final site grading in areas adjacent to buildings should be sloped at least two (2) percent away from the building, except where the area adjacent to the building is paved. GENERAL EARTHWORK AND STRUCTURAL FILL: The proposed building and pavement areas should be stripped and cleared of all surface vegetation, all organic matter, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill. Structural fill is defined as any fill placed under the building, behind permanent retaining or foundation walls, or in other areas where the underlying soils needs to support loads. This engineer should observe site conditions during and after excavation prior to placement of any structural fill. All structural fill should be placed in horizontal lifts with a moisture content at or near the optimum moisture content. The optimum moisture content is that moisture content which results in the greatest compacted dry density. The moisture content of fill soils is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type, compaction equipment, and the number of passes made to compact the lift. In no case should the lifts exceed twelve (12) inches in loose thickness. The following table presents recommended relative compaction for structural fill: Location of Fill Placement Beneath footings, slabs or walkways Behind retaining walls Beneath pavements Minimum Relative Compaction 95% 90% 95% for upper 12 inches of Sub -grade, 90% below that level City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 8 Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of on -Site Soils if grading activities take place during wet weather, or when the sandy, on -site soils are very wet, site preparation costs may be higher because of delays due to rains and the potential need to import granular fill. The on -site soils are generally sandy and thus are not highly moisture sensitive. Grading operations will be difficult when the moisture content of these soils greatly exceeds the optimum moisture content. Moisture sensitive soils will also be susceptible to excessive softening and t6pumping" from construction equipment traffic when the moisture co I ntent is greater than the optimum moisture content. Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion I of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic materials are segregated and moisture contents are monitored by engineering inspection. DRAINAGE CONTROLS: No drainage problems were evident with the existing residence and the overall site. Surface runoff would flow westerly following the topographic slope. However, the extremely porous sub_grade sands allow for infiltration. This engineer performed an on -site infiltration test (complying with King County Surface Water Drainage Manual standard methodology). The 5 hand dug test holes were filled with water during saturated winter conditions. All 5 test holes drained very quickly at maximum infiltration rates. This maximum infiltration (greater than 24 inches in 20 minutes) is expected due to the presence relatively clean sands. Design Infiltration Rate: 15 inches per hour City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 9 This engineer recommends using 15 inches per hour as a design infiltration rate in conjunction with storm water control for the two proposed houses. Use standard infiltration trench designs attached. Geotechnical inspections required during installation of infiltration trenches. CONCRETE: All foundation concrete (footings, stem walls, slabs, any retaining walls, etc.) shall have a minimum cement content of 5-1/2 sacks per cubic yard of concrete mix. DRIVEWAY ZONE — RETAINING WALL: As stated, the driveway access will require a reinforced concrete wall and subsequent fill material. It is essential that base of driveway retaining wall be founded in dense, native sub -grade soils as verified by geotechnical inspections. Additionally, proper placement of approved fill material requires inspections. SLOPES — SETBACKS / BUFFERS: There are no geotechnical conditions limiting or restricting the location of the two new residences. The area proposed for infiltration is stable and will accommodate infiltration trenches designed in accordance with the criteria herein. EDMONDS STEEP SLOPE EXEMPTION: The following items respond to City of Edmonds steep slope exemption criteria. 'o The site will be stable following the permitted activity provided geotechnical inspections verify the recommendations in this report. The proposed development will occur on steep slope areas that qualify as advance outwash in accordance with the geological map of the Edmonds east and part of the Edmonds west quadrangles by James P. Minnard. * Fill material: Neither of the proposed 2 new residences will require fill. City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 10 The access driveway will require a reinforced concrete retaining wall and approved structural fill. It is understood that this engineer will perform on -site geotechnical inspections to verify proper placement of approved fill materials. • None of the following conditions exist on the steep slope area: impermeable soils inter -bedded with granular soils, springs or groundwater seepage, significant visible evidence of groundwater seepage, previous land sliding or instability, or existing land slide deposits. • The thickness of organics, debris, weathered soils, coiluvial soils or soils exhibiting loose conditions on or adjacent to the steep slope are less than 3 feet. • All excavations on the steep slopes will not extend below a 35 degree plane extended down from the property line. * All retaining structures on steep slopes shall be engineered structures conforming to the State Building Code, and subject to on -site geotechnical inspections by this engineer. No rockeries greater than 4 feet in height are proposed. * An undisturbed buffer of 15 feet shall be maintained from the proposed development to adjacent residential properties. * The proposed development (2 new residences and access driveway) will not decrease the stability of any adjacent property, subject to on -site geotechnical inspections by this engineer. INSPECTIONS: The recommendations of this report are only valid when key geotechnical aspects are inspected by this engineer during construction: • Soil cuts • Foundation sub -grade verification • Retaining wall, or rockery placement • Any fill placement • Subsurface drainage installation • Infiltration trench placement • Temporary and final erosion control City of Edmonds c/o Eric Thuesen Custom Homes January 13, 2005 Page 11 SUMMARY: The proposed 2 new residences and access driveway at 506 9th Ave. N, Edmonds, Washington are geotechnically viable when constructed in accordance with the recommendations herein, compliance with City of Edmonds approved plans and requirements, and key geotechnical inspections during construction'. GEOTECHNICAL REVIEW OF FINAL PLANS: At the time of this investigation and report, final house plans were not available for review. I As stated in this report, Eric'Thuesen proposes to construct �2 new residences in accordance with the Site Plan with a north side access driveway. The dense native sands allow for standard foundation construction in accordance wifh the recommendations of this report. ' I Additionally, the native sands allow for storm water infiltrati69 west of the second house, subject to inspections. I Prior to final permit issuance, this engineer should review the final house plans to verify compliance with the recommendations of this report. Upon satisfactory review, 4 "Statement Of Minimal Risk" wil ! I be issued. CLOSURE: The findings and recommendations of this report were prepared in accordance with generally accepted professional engineering principles and pr i actice. No other warranty, either express or implied, is made. The conclusions arel based on the results of the field exploration and interpolation of subsurface conditions between explored locations. If conditions are encountered during construction that appear to be different +11; r% innar chn"Id be notified to observe the than those descriDed in MIS 1UPU1 ' L, 0 U �J situation and review and verify or modify the recommendations. If there are any questions, do not hesitate to call. Dennis M. Bruce, P.E. 11 Geotechnical / Civil Engillluul DMB:abj Feb 02 05 10:50a D. Bruce, P.E. 20G-54G-8442 P.1 Dennis M. Bruce, RE. �-Am 13 f �LOOK- M.S.C.E., M.B.A. Geotechnical /Civil Engineer il�r I IL-rp-N-Ttoo -T-a-c.-r Lccs p oce- - L L �10LES, k A-7 Eh Ut 3--ACIF MANUAL 43 ltl3pm�-rplk-ciop TA-T-E \S ", khNt" tWu- -F0 X.6", LESS "frN -r -KFco m a g7w ts A we -wek , t LES16,j t-k'TE' 4 ts- 140ok- I ow S-m. Im feirmATIOIJ kEF&(6/j (A-t TOKU� =WMS 1202Y 5 p D!Lf—1 M EGAL solLs - qouvDArlams - slrE DEVELOP ENT , INSPECTION I DR04INAGE - DcSIGNS PERMIT - L P.O. Box 55502 4, Shoreline, WA 98155 - (206) 546-9217 * FAX (206) 546-8442 \01 \0 V, Feb 02 05 10:50a D. Bruce, P.E. 206-546-8442 P.2 City of Edmonds c/o, Eric Thuesen Custom Homes January 13, 2005 Page 8 Where: Minimum relative compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D-1 557-78 (Modified Proctor). Use of On -Site Soils if grading activities take place during wet weather, or when the sandy, on -site soils are very wet, site preparation costs may be higher because of delays due, to rains and the potential need:tb import granular fill. The on -site soils are generally s�ndy and thus are not highly moisture sensitive. Grading operations.will be difficult when the moisture content of th�ese soils greatly exceeds thja optimum moisture content. moisture- sensitive soils will also be-s-usceptible to excessive softenin.% and oisture cohtent isg'reater than ,.pumping" from construction equipment tFaffic wh6ri the M' the optimum moisture content. Ideally, structural fill, which is to be placed in wet weather, should consist of a granular soil having no more than five (5) percent silt or clay particles. The percentage of particles passing the No. 200 sieve should be measured from that portion of the soil passing the three -quarter -inch sieve. The use of "some" on -site soils for fill material may be acceptable if the upper organic materials are segregated and moisture contents are monitored by engineering inspection. DRAINAGE 1,ONTROLS: No drainage problems were evident with the existing residence and the overall site. Surface runoff would flow westerly following the topographic slope. However, the extremely porous sub -grade sands allow for infiltration. ing County This engineer performed an on -site infiltration test (complying with K Surface Water Drainage Manual standard methodology). The 5 hand dug test holes el were filled with water during saturated winter conditions. All 5 test holes drained very quickly at maximum infiltration rates. This maximum infiltration (greater than 24 inches in 20 minutes) is expcted due to the presence relatively clean sands. Design Infiltration Rate: 15 inches per hour 0 E I aeL - - - -------- J 17 Mv 7 &CHIN It CALET STREII a-c* Dl%%QM ITAHIIAAY SEWER No WATER &MCIE N"A'Al- i-;;- LEM DCSCFJPWN PAXLIYJNARY SUBDIASION PLAN ron SEN CUMM HOMES IN SEI/4, NWI/4, 5ECTIDN 24, C27 N.. R.S E.. W.V. A city or lomokos 0 SNO14OVISM COUNIT. WASHONGTON —Ams JS 09: 14a D. Bruce, P. E. 206-546-0442 p.3 C.2.3-114MIRATION *OES AND DRYWELLS FIGURE C-2-B TYPICAL DOWNSPOUT ]NFMTRATION SYSTEM ult P- Ar 0 t L-r ro P-E:57� drain I;= 4" rigid or 6" flexible perforated pipe.'-'e 9"' " - "'! I E0 Ev- T, - ��� ---I- -r fl ;eZrated pipe Q---S .................... ------------- ---- 17- ---------------------- ie;ich --- ---------- PLAN VIEW sump w/solid lid 1 NTS roof drarn �j f7e- FS IP Y, 6t overflow AIM- tOtf 4' rigid or 6"flexible & fthy"60 perforated pipe splash block T-O ----- -------- 7 -------- o%/Water .0, 6 17--- 1 separator washed ---------- ---- ------ n==1 7 fine mesh screen CB sump w/solid lid PROFILE VIEW filter fabric compact d backfill 0 1 Ogid or 6" flexible .7 Ve perforat ted pipe 00 V 0 "a 0, V D 0 0 washed rock r aaq A NTS Swafl Sim Draimg,- 9/1198 (go D 0) Ok/ LA,) Ch :C-u cin cr- uj F- - e-lNjO K T H C= z C" 0 C-) ALE: 1" 2 0 CC LLJ a. 40 slxv Iry CAR 5LAe,,, J\ Mk7-0' IV 34.4 00 %0 /s,q ki I fi 4d 26Z 4a 5a -APPfi�OVED ay PL APPROJED # ASNOTED El BY E- GIN ING Date: cowrouR5 2'iw-rF-vAL,5 amec/-'hwt�r b UVVNER/CONTRA-'TOR iS RESPONSIBLE FOR EROSION 00Ni KOL AND DAMAGE May 15 04 019:31a D. Bruce, P.E. 20G-546-8442 P�l Dennis M. Bruce, P.E. M.S.C.E., M., A. Geotechnical /Civil Engineer November 12, 2004 City of Edmonds clo Eric Thuesen Custom Home I 8M Wh PL W. Edmonds, WA 98026 16- S I Subject: Geotechnical Review — Site Plan Proposed Now Residence So 99h Ave. North Edmonds, Washington This engineering report presents d'ie results of a geotechnical review of the property and site plan fbr the proposed rw-w residence by Thuesen Custom Homes. REFERENCES: • Preliminary* geotechnical report by D. Bruce, P. E. October 21, 2001 • Soil test pit photographs dated September 4, 2002 • Site Plan for proposed for new residence by Thuesen homes - BACKGROUND: This engineer has provided geotechnical services for potential buyers and developers of the overall property at 503 e Ave. N. The soil test pits where dug on September 4, 2002 in the vicinity of the proposed new home by Thuesen Custom Homes. This engineer venfled very dense native sands with gravels at shallow footing depths. PROPOSED NEW RESIDENCE: This engineer has reviewed the attached sit plan by Thuesen Custom Homes for the new residence to be located inthe "Tenriis court" zone. The topography for the site has been performed by LSA and defines the top -of -slope. See survey map. SOILS - FOUVIRAnaVS - V1M,0-CvEjOqVEW . INSpECTIOW . DR&,VA6,- '0'FS1G1Vj'0Efl 'WIT - f-154GAL P.O. Box 55502 - Shoreline, WA 98155 - (206) 546-9217 & FAX (206) 546-8442 FILE u-tuti : &-ia D. Bruce, P.E. p. 2 Ciby of Edmonds 11-9-04 Page 2 of 2 206-546-6442 0 The proposed site plan for the new residence vWll result in the foundation to be set back 25 feet from the top -of -steep slope boundary. The reduction of the buffer from 50 feet to 25 feet will have no adverse impact on the site, the public, or any private party, subliect to nsite geotechnical inspections by this engineer. SUMMARY: The proposed new residence and location per site plan (with 25 foot set back from top of slope ) is geotechnically w1w—oved subject to onsite inspections by this engineer. If there are any questions, do not hesitate to call. XL"RZI, / PC. Dennis M. Bruce, P.E. Geotechnical / Civil Engineer DMB:lmb SIMA M Peter Chopelas, PE Engineering & Design Services 307 N. Olympic Ave, Suite 208 Arlington, WA 98223 Chopelasandassociates@glnail.com Geotechnical Addendum To the report Dated March 23, 2012, as Revised in May 15, 20'12, and October 25, 2012 October 17'h, 2013 Eric Thuesen 509-96' Avenue N. Edmonds WA 98020 Ericthuesen(@froritier.com 1-425-772-9401 _01 OCT 3 12013 DEVELOPMENT SERVICES . COUNTER Subject: geotechnical review of proposed site plan changes for plan ck # 2013-1175 at the above address. Site plan changes: This addendum should be included with the Geotech report for this property dated march, 23, 2012, as revised May 15'h and Oct 25, 2012. A review of the proposed site plan changes and the original geotechnical report was accomplished. All of the changes are acceptable with the following conditions since none of the proposed changes affect any of the original recommendations, and none of the changes will have any significant impacts to the critical slope. . There is a proposed short 2 to 3 ft tall concrete wall to go along the south property line down the slope of about 30 percent, the wall turns 90 degrees from the south property line to join the cabana. A fence no taller.than 6 ft (total height) is proposed on top of this wall and footing. This wall and fence can be installed as proposed as long as it rests on original undisturbed sub soil below any old fill or topsoil and roots (or other organic material). The bottom of the footing should be min. of 12" below final grade to protect against frost heave. This area is mostly undisturbed glacial till, very dense and very stable, therefore it will not affect slope stability. A four foc�t total height retaining wall is proposed at about 24-25 from the house, back from the top of original slope to separate the upper and lower back yard- areas. The footing for this must bear on original undisturbed subsoil below any old fill or organic material (top soil, roots, etc). This wall will also incorporate a raised planter for landscaping purposes. This retaining wall and planter is acceptable as proposed since it will not be built on the slope and should bear on original undisturbed soil. Another proposed change is the addition of an in -ground hot tub that will be adjacent to the existing home about 20 ft back from the top of the old slope. The soil in this area was examined and it is original undisturbed glacial till, it is very dense and has a very high bearing capacity. There are no restrictions to installing this hot tub at this location. It will not affect the slope stability.and is back from the critical slope area. If you have any questions or if j,!1pgk be of further assistance please feel free to call or 0 email at the above address. Peter Chopelas PE. Peter Chopelas, PE Engineering & Design Services 307 N. Olympic Ave, Suite 208 r T 3 Arlington, WA 98223 T �.:-"'ET FILE (360) 653-4615; Chopelasandassociates@gmaii.com September 16, 2013 RECEIVED Eric-Thuesen OCT 2 2 2013 509 9th Avenue N. Edmonds WA 98020 DEVELOPMENT SERVICES EnCtIlUeseW&,frontier.com COUNTER 1-425-772-9401 Subject: 4 foot retaining wall for Thuesen Custom homes. Ref BLD 20110775 A four foot tall retaining wall is designed for landscaping in the rear yard, for use at the above address. The following design conditions were used: ateral soil loads and vertical loads were analyzed for the subject retaining wall according to -,-Ye requirements of the 2009 International Building Code (ASCE 7-05). The following design conditions for the analysis are based on the site conditions or according to the minimum code requirements-. 3oil Bearina Capacity: 2,000 PSF e i lent fluid pressure: au'va 35 PSF iv .1in. concrete strength: 2500 PSI 'Y,-"n. steel reinforcement: grade 40 (40,000 psi) :--� smic Site Class: D -ic se smic tbrces. Overturning ;,,e safety factor and equivalent fluid pressure accommodates tt I Fir-6 lateral slidinR fbrces exceed the required safety factor of 1.5. Concrete strength and steel r-.inforcemcnt is in excess of the applied loads, and meet min. reinforcement requirements I*or -emforced concrete and temperature related steel reinforcement. Calculations are included. Tf, vou have any questions or are in need of further assistance please feel free to call. Peter Chopelas, PE RECEIVED EngineeC7in,51 & Design Se7-Vices -307 N. Olympic Ave, Suite 208 CT 2 2 2013 -A rlington, WA 9822-3 (360) 65-3-4615 Chopelasandassor-iates@gmail.com DEVELOPMENT SERVICES COUNTER Tv� 'ic sev\ fp, I A Y� 6 f, tz�,- - I- A _j e7 7,e,'- _7 7 pj mbn. I RECEIVE f OCT 2 2 2013 DEVELOPMENT SEM . COUNTER 73 'IYJ f-A J. f --j -2-. - 7T7-3�- y t"A L2 vi 0 571 CITY OF EDM-ON6--§—'-- BUILDING DEPARTMENT W 0 R K Re-121 ADDRESS OWNER APPROVED DATE: BLDG. OFFICIAL PERMIT NUMBER OeO ZO /9 - // 7-57 OCT 2 2 2013 DEVELOPMENT SERVICES COUNTER APeter Chopelas, PE Engineering & Design Services RECEIVED M7 N. Olympic Ave, Suite 208 Arlington, WA 98223 OCT 2 2 2013 (360) 653-4615; Chopelasandassociates@gmai*l.com OEVELOPMENT SEWICES Ge6technical Report March 23, 2012 Revised: May 15, 2012 Eric Thuesen 509-9'h Avenue N. Edmonds WA 98020 Ericthuesen(krontier.corn 1-425-772-9401 Subject: geotechnical investigation for plan ck # 2011-0775 accessory structure (cabana) at the above address A geotechnical investigation of the above property was performed to address slope stability, erosion control and drainage issues. This sloping sitd-has been extensively altered due to previous construction activities including extensive cut and fill of the slope. A small accessory structure (cabana) and a retaining wall is proposed to be built below the residence at the top of slope below the home. The investigation consisted of a site inspection to examine soil's and site conditions and to take measurements on the sites. A review of published material on local geology from the USDA Soil Survey of Snohomish County, and a review of the geotechnical report done by Dennis Bruce PE, dated Jan 13th, 2005 for this site. I The investigation found that the site can be made satisfactory with deep foundations for the proposed accessory building, and a retaining wall with footings deep enough to get below the fill, and the use of surface stabilization measures. The building site for the cabana is on shallow old fill placed at the top of the slope to make the �ack yard terrace larger. There is an existing site drainage system, including yard drains, and a conveyance system that transports all roof and driveway run-off to the base of the hill. The fill, though stable for landscaping features, is not suitable for permanent buildings. Therefore the proposed building and retaining wall should be built on foundations deep enough to bare on the original undisturbed subsoil. This will allow the proposed development with a generous safety factor of 1.5 or greater. - These measures will reduce risk of landslides, increase slope -sfability and will. not increase . surface water discharge, sedimentation or erosion on downstream sites. This development will not increase surface water discharge, and it will not decrease slope stability but rather increase stability and it will not adversely impac A i.a.1 areas. ZIA- GO FIESUB W, 14AY 2 9 2012 co 13U[LDING DEPAK."MEN1 Peter Chopelas PE �7 4 CITY OF EDMONDS Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal r, sewer and a public water supply, and with an existing residence and garage built on a terrace on a sloping site. There is a proposed accessory building of 320 SF, with a 360 SF attached deck, a retaining wall and back fill to enlarge the useful backyard, placed at the top of a steep slope below the existing residence. The building site is about 160 feet from the toe of the slope, and about 50 feet in elevation above it. The foundation will be deep enough to reach below the old fill to bear on original undisturbed soil. These are Allowed Activities in a critical area per 23.80-090. B (1). 23.40.120 Mitigation sequencing. 1. The impact cannot be avoided since it is the property owner's desire to increase the safety factor of the slope and enlarge the useful yard area by adding an engineered retaining wall and building the cabana with an engineered foundation on the edge of a small level terrace. 2. The impacts are minimized by building a modest building and enlarging the useful area of the backyard byabout 300 SF. Site disturbances on the slope should be kept to a minimum during construction, it should be done during the dry season, and all exposed soil will be covered during the construction phase. Both temporary and permanent soil stabilizing measures are recommended. 3. There are no impacts to wetland nor to any habitat area since none are disturbed. The site will be more stable and surface vegetation restored after the project is completed. 4. Both the foundation and retaining structure are engineered structures and will result in a safer, more stable slope condition than the existing site conditions. 5. The recommendations for the proposed project will result in long term slope stability. Recommendations include installing stabilizing engineered structures, protecting and maintaining the vegetation on the slope, and to minimize unnecessary site disturbances. 6. No compensation for impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas are required since none are disturbed. 7. Monitoring the hazard will be done during. the construction since the soil conditions have to be inspected prior to placing the footings, and during the construction to verify design conditions are met. Design adjustments may be made tonuinimize any hazards. Site Conditions The terrain slopes steeply to the west at about 32 percent average grade from a near level terrace on the east half where the existing residence is located. The terrace has existing lawn and landscaping and there is mix of grasses and landscaping shrubs and small to medium trees on the slope. There is no significant surface drainage on the site, and no seepage on the site. There is an existing drainage and conveyance system to transport surface discharge from the roof tops and driveway to the base of the slope to the west. The proposed construction site is at about 50 percent grade, which was probably created by placement of fill on the slope from the spoils of the foundation excAtions when the house was built since deePIP, was found near the top of the slope. Local Geology The subject site lies along a slope forming the edge of the highland plateau of the Edmonds area. The general stratigraphy (soil layering) of the area is characterized -by fluvial. and glacio-fluvial- sediments from sea level to around 200 feet, with glacial till and sand deposit plains that make up the surficial sediments on most of the plateau. The USDA Soil Survey of Snohomish County maps the soil as Everett gravelly sandy loam and Alderwood gravelly sandy loam. The Everett soil is deep excessively drained soil on terraces and outwash plains. It is formed in glacial out wash. The sub -soil is dark brown gravelly sandy loam down to about 60 inches, with increasing gravel at the deeper depths. The Alderwood gravelly sandy loam is moderately well drained soil on till plans, moderately deep over a hardpan, and formed in glacial till. Both of these soils are very stable and suitable for building site development. This soil has good strength and is not prone to slumps or landslides. It is subject to surface erosion when exposed to the weather and measures are required to prevent erosion. This soil is not prone to liquefaction. The site shows no evidence of landslides or deep soil instability. There were some minor tension cracks in the soil near the top of the slope, but this was old fill that has been settling and causing surface irregularities. This does not pose a hazard to this site or the adjoining site, and the slope will be reinforced with the addition of the proposed structures. There is no flooding risk on this property. There are no wetlands or surface water on this property, however several hundred feet down slope there is a wetland at the toe of the slope. Geotechnics Surface soils have been inspected over most of the site and on the slopes by visual inspections'. The underlying undisturbed soil on the subject site is deep silty sand, this is old alluvial outwash. The soil on the. proposed building site below the existing home is undifferentiated fill I to 4 feet deep, likely the spoils from the house site excavations. It is a mix of sand and gravel and has organic material and other debris mixed into it. This was placed at the top of the slope, over steepening the upper 10 feet or so of the slope. lo I Soil Mo, 7 Soil log 3 Soil log 4 PSoil 0-12" mixed fill 0-36" mixed fill 0-48"+ mixed fill 0-18" fill 12"+sand loarnEP36"+ sandy loam 18"+ sandy loam 0 . 0011 jog table Slope stability: Analysis of the natural grade of the steeper parts of the site using the Singh diagrams indicates that the slope shows a Factor of Safety of 1.8. This reduces to about 1.6 for dynamic seismic conditions. This indicates a stable slope with a large safety factor over the 1.5 and 1.2 minimum requirements respectively. The upper filled slope is also currently stable, but with a lower safety factor of about 1.2. This is acceptable for landscaping features, but deeper footings must be used to get into the underlying original'subsoil. The soil properties of the undisturbed Everett soil is as follows: density (gamma)= 130 PCF; Cohesion (C)= 100 PSF, height of the slope is 50 feet. Erosion: All of the existing site is well protected from erosion with established vegetation All of the slopes ov ' er 30 percent on this site is subject to severe erosion if the soil is exposed. Minimize disturbing any vegetation on the slope. Any exposed soil on the site must have deep rooting ground cover installed as soon as practical, avoid concentrated surface flows on the slopes, and to transport by tight -line roof and driveway runoff to the base of the slope through the existing drainage system. 23.90.060 and 23.80.070 Development standards. The recommendations in the following section will achieve the following: I - It will not increase the threat of the geological hazard to adjacent properties beyond predevelopment conditions; and will reduce them since it will improve the safety factor. 2. It will not adversely impact other any other critical areas. 3. These recommendations are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than predevelopment conditions; and 4. All are certified as safe as designed, and under anticipated conditions, by a qualified engineer licensed in the state of Washington. Note that construction buffers for the proposed development is zero. The proposed changes will stabilize the slope to bring the safety factor well above the 1.5 minimum, so no buffers are required for this project. Therefore section 23.80.070 (1) does not apply. However, it is recommended to keep heavy construction equipment back from the top of the slope at least 10 feet during construction. This proposed development is certified to: a. Reduce, and not increase surface water discharge or sedimentation to adjacent properties beyond.predevelopment conditions; b. It will increase, and not decrease slope stability on adjacent properties; and c. These alterations will not adversely impact other critical areas; 3. Design Standards. Development within an erosion or landslide hazard area and/or buffer shall be designed to meet the following: a. The proposed development has a design safty factor of 1.5 or above static, and 1.2 and above dynamic, after the recommendations are accomplished. There is no reduction in the safety factor for the site, or to any adjacent properties. b. The Structures and improvements are placed to to avoid geologically hazar . dous areas and to improve the slope safety factors, and will have no affect on other critical areas; c. The proposed structures and improvements minimize alterations to the natural contour of the slope, and foundations are tiered where possible to conform to existing topography; d. Structures and improvements are located to preserve the most critical portion of the site and its natural landforms and vegetation; e. The proposed development do not result in greater ri�k or a need for increased buffers on neighboring properties; f. Retaining walls are used to allow the maintenance of existing natural slope rather than graded artificial slopes; g. The development minimizes impervious lot coverage, the proposed building is modest in size; 4. Vegetation Retention. All vegetation on the slopes shall be left undisturbed outside of the construction area; 5. Seasonal Restriction. Clearing shall be allowed only from May I st to October I st of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions; 6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from erosion or landslide hazard area are prohibited. All roof and surface discharge shall be collected and tight -lined to the existing site drainage system where it is conveyed to a an approved discharge point where there is no erosion hazaxd. 7. Prohibited Development. No On -site sewage disposal systems are proposed for the site. Recommendations The proposed building location can be used with a reasonable assurance of long term slope stability and safety to the building if the following recommendations are followed: 1 . Conventional footings may be used as long at it is placed a minimum of 12" into the original undisturbed sub -soil below the old fill. Bearing capacity is 2000 PSF. Equivalent fluid pressure of 35 PCF for retaining walls for drained on -site back fill. Coefficient of friction for the soil is 0.55 and passive soil (lateral bearing) pressure of 350 PCF. All bearing soil should be inspected by the engineer before concrete is poured. 2. The up hill footings of the accessory structure can be supported on two 24" square x 10" thick concrete footings, one near each comer of the building. These should be placed below the fill 12" into original undisturbed subsoil. The footings should be reinforced with (3) #4 rebars in each directions (3" clearance from soil). A 12" diameter Sonotiibe formed concrete column can be installed on top of these footings up to grade, this should be reinforced with (4) vertical #4 bars with a #3 horizontal hoops every 8". The excavated soil must be back filled and compacted over and around these footings up to grade. 3. Roof run' --off should be directed to a catch basin in the existing conveyance system and tight - lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope. 4. A silt fence should be placed on the downhill side of the construction site to attenuate silt - laden run-off if necessary. Silt fences should be placed around catch basin inlets. Soil that is' to be removed and reused around the site should be kept away from the top of the slope. Soils not to be reused. on the site should be hauled off site to an approved location. 5. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope shoiild be protected with jute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soil needs to have topsoil spread and compacted and planted witli'vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows: Common Name Percent by Wei2ht Perennial ryegrass 40 Annual ryegrass 20 Red Fescue 40 This should be applied at a hydro -seed rate of I LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10-20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: Trees*( 3-41 size; plant 6' o.c.) Shrubs*(to be 1-3' size; plant 2 foot O.C.) Vine Maple Kinnick-kinnick Big leaf maple Salal Nobles fir Snowberry Grand fir Vinca Minor Oregon Grape Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. cri �o p--q 0 L) 4 0 -0 0 0 ti cl, tb 0 E� . : t�, APeter Chopelas, PE Engineering & Design Services RECEIVED M N. Olympic Ave, Suite 208 OCT 2 2 2013 Arlington, WA 98223 (360) 653-4615; Chcipelasandassociates@gmail.com DEVELOPMENT SERVICES COUNTER Geo'technical Report March 23, 2012 Revised: May 15, 2012 Eric Thuesen 509-9th Avenue N. Edmonds WA 98020 Ericthuesene,frontier.com 1-425-772-9401 XZ= Subject: geotechnical investigation for plan ck # 2011-0775 accessory structure (cabana) at the above address A geotechnical investigation of the above property was performed to address slope stability, erosion control and drainage issues. This sloping sit6has been extensively altered due to previous construction activities including extensive cutand fi-11 of the slope. A small accessory structure (cabana) and a retaining wall is proposed to be built below the residence at the top of slope below the home. The investigation consisted of a site inspection to examine soil s* and site conditions and to take measurements on the sites. A review of published material on local geology from the USDA Soil Survey of Snohomish County, and a review of the geotechnical report done by Dennis Bruce PE, dated Jan 13th, 2005 for this site. I The investigation found that the site can be made satisfactory with deep foundations for the proposed accessory building, and a retaining wall with footings deep enough to get below the fill, and the use of surface stabilization measures. The building site for the cabana is on shallow old fill placed at the top of the slope to make the -back yard terrace larger. There is an existing site drainage system, including yard drains, and a conveyance system that transports all roof and driveway run-off to the base of the hill. The fill, though stable for landscaping features, is not suitable for permanent buildings. Therefore the proposed building and retaining wall should be built on foundations deep enough to bare on the original undisturbed subsoil. This will allow the proposed development with a gen e'rous safety factor of 1. 5 or greater. These measures will reduce risk of landslides, increase slope - stability and will not increase surface water discharge, sedimentation or erosion on downstream sites. This development will not increase surface water discharge, and it will not decrease slope stability but rather increase stability and it will not adversely impac"thpr, rit Q ,,,c,,,Lal areas. Peter Chopelas PE 974 1`1 E S 1 11 ii% ri U= MAY 2 9 2012 UILDING DEPAR;.&I r.17Y OF EDMO DS 40. Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal , sewer and a public water supply, and with an existing residence and garage built on a terrace on a sloping site. There is a proposed accessory building of 320 SF, with a 360 SF attached deck, a retaining wall and back fill to enlarge the useful backyard, placed at the top of a steep slope below the existing residence. The building site, is about 160 feet from the toe of the slope, and about 50 feet in elevation above it. The foundation will be deep enough to reach below the old fill to bear on original undisturbed soil. These are Allowed Activities in a critical area per 23.80.090. B (1). 23.40.120 Mitigation sequencing. 1. The impact cannot be avoided since it is the property owner's desire to increase the safety factor of the slope and enlarge the useful yard area by adding an engineered retaining wall and building the cabana with an engineered foundation on the edge of a small level terrace. 2. The impacts are minimized by building a modest building and enlarging the useful area of the back yard by about 300 SF. Site disturbances on the slope should be kept to a minimum during construction, it should be done during the dry season, and all exposed soil will be covered during the construction phase. Both temporary and permanent soil stabilizing measures are recommended. 3. There are no impacts to wetland nor to any habitat area since none are disturbed. The site will be more stable and surface vegetation restored after the project is completed. 4. Both the foundation and retaining structure are engineered structures and will result in a safer, more stable slope condition than the existing site conditions. 5. The recommendations for the proposed project will result in long term slope stability. Recommendations include installing stabilizing engineered structures, protecting and maintaining the vegetation on the slope, and to minimize unnecessary site disturbances. 6. No compensation for impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas are required since none are disturbed. 7. Monitoring the hazard will be done during the construction since the soil conditions have to be inspected prior to placing the footings, and during the construction to verify design conditions are met. Design adjustments may be made to minimize any hazards. Site Conditions The terrain slopes steeply to the west at about 32 percent average grade from a near level terrace on the east half where the existing residence is located. The terrace has existing lawn and landscaping and there is mix of grasses 'and landscaping shrubs and small to medium trees on the slope. There is no significant surface drainage on the site, and no seepage on the site. There is an existing drainage and conveyance system to transport surface discharge from the roof tops and driveway to the base of the slope to the west. The propc;sed construction site is at about 50 percent grade, which was probably created by placement of fill on the slope from the spoils of the foundation extations when the house was built since deep fill was found near the top of the slope. Local Geology The subject site lies along a slope forming the edge of the highland plateau of the Edmonds area. The general stratigraphy (soil layering) of the area is. characterized by fluvial -and glacio-fluvial sedimend-6om sea -level to around 200 feet, with glacial till and sand deposit plains that make up the surficial sediments on most of the plateau. The USDA Soil Survey of Snohomish County maps the soil as Everett gravelly sandy loam and Alderwood gravelly sandy loam. The Everett soil is deep excessively drained soil on terraces and outwash plains. It is formed in glacial out wash. The sub -soil is dark brown gravelly sandy loam down to about 60 inches, with increasing gravel at the deeper depths. The Alderwood gravelly sandy loam is moderately well drained soil on till plans, moderately deep over a hardpan, and formed in glacial till. Both of these soils are very stable and suitable for building site development. This soil has good strength and is not prone to slumps or landslides. It is subject to surface erosion when exposed to the weather and measures are required to prevent erosion. This soil is not prone to liquefaction. The site shows no evidence of landslides or deep soil instability. There were some minor tension cracks in the soil near the top of the slope, but this was old fill that has been settling and causing surface irregularities. This does not pose a hazard to this site or the adjoining site, and the slope will be reinforced with the addition of the proposed structures. There is no flooding risk on this property. There are no wetlands or surface water on this property, however several hundred feet down slope there is a wetland at the toe of the slope. Geotechnics Surface soils have been inspected over most of the site and on the slopes by visual inspections'. The underlying undisturbed soil on the subject site is deep silty sand, this is old alluvial outwash. The soil on the. proposed building site below the existing home is undifferentiated fill I to 4 feet deep, likely the spoils from the house site excavations. It is a mix of sand and gavel and has organic material and other debris mixed into it. This was placed at the top of the slope, over steepening the upper 10 feet or so of the slope. Soil log 1 �o Soil Iner 2 Soil log 3 Soil Ingr 4 ed 0 12" mixed fill 11 mix 2 !12"+ 0_�o 0-36" mixed fill mixed -loam 0-48"+ mixed fill 0- 18 " fill sand loam 3 6"+ sandy 18"+ sandy loam UVJLJk Ug L4U1V Slope stability: Analysis of the natural grade of the steeper parts of the site using the Singh diagrams indicates that the slope shows a Factor of Safety of 1.8. This reduces to about 1.6 for dynamic seismic conditions. This indicates a stable slope with a large safety factor over the 1.5 and 1.2 minimum requirements respectively. The upper filled slope is also currently stable, but with a lower safety factor of about 1.2. This is acceptable for landscaping features, but deeper footings must be used to get into the underlying original 'subsoil. The soil properties of the undisturbed Everett soil is as follows: density (gamma)= 130 PCF; Cohesion (C)= 100 PSF, height of the slope is 50 feet. Erosion: All of the existing site is well protected from erosion with established vegetation All of the slopes ov - er 3 0 percent on this site is subject to severe erosion if the soil is exposed. Minimize disturbing any vegetation on the slope. Any exposed soil on the site must have deep rooting ground cover installed as soon as practical, avoid concentrated surface flows on the slopes, and to transport by tight -line roof and driveway runoff to the base of the slope through the existing drainage system. 23.k060 and 23.80.070 Development standards. The recommendations in the following section will achieve the following: 1. It will not increase the threat of the geological hazard to adjacent properties beyond predevelopment conditions; and will reduce them since it will improve the safety factor. 2. It will not adversely impact other any other critical areas. 3. These recommendations are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than predevelopment conditions; and 4. All are certified as safe as designed, and under anticipated conditions, by a qualified engineer licensed in the state of Washington. Note that construction buffers for the proposed development is zero. The proposed changes will stabilize the slope to bring the safety factor well above the 1.5 minimum, so no buffers are required for this project. Therefore section 23.80.070 (1) . does not apply. However, it is recommended to keep heavy construction equipment back from the top of the slope at least 10 feet during construction. This proposed development is certified to: a. Reduce, and not increase surface water discharge or sedimentation to adjacent properties beyond.predevelopment conditions; b. It will increase, and not decrease slope stability on adjacent properties; and c. These alterations will not adversely impact other critical areas; 3. Design Standards. Development within an erosion or landslide hazard area and/or buffer shall be designed to meet the following: a. The proposed development has a design safty factor of 1.5 or above static, and 1.2 and above dynamic, after the recommendations are accomplished. There is no reduction in the safety factor for the site, or to any adjacent proper -ties. b. The Structures and improvements are placed to to avoid geologically hazardous areas and to improve.the slope safety factors, and will have no affect on other critical areas; c. The proposed structures and improvements minimize alterations to the natural contour of the slope, and foundations are tiered where possible to conform to existing topography; d. Structures and improvements are located to preserve the most critical portion of the site and its natural landforms and vegetation; e. The proposed development do not result in greater ri�k or a need for increased buffers on neighboring properties; f. Retaining walls are used to allow the maintenance of exist ing natural slope rather than graded artificial slopes; g. The development minimizes impervious lot coverage, the proposed building is modest in size; 4. Vegetation Retention. All vegetation on the slopes shall be left undisturbed outside of the construction area; 5. Seasonal Restriction. Clearing shall be allowed only from May I st to October I st of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions; 6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from erosion or landslide hazard area are prohibited. All roof and surface discharge shall be collected and tight -lined to the existing site drainage system where it is conveyed to a an approved discharge point where there is no erosion hazard. 7. Prohibited Development. No On -site sewage disposal systems are proposed for the site. Recommendations The proposed building location can be used with a reasonable assurance of long term slope stability and safety to the building if the following recommendations are followed: I . Conventional footings may be used as long at it is placed a minimum of 12" into the original undisturbed sub -soil below the old fill. Bearing capacity is 2000 PSF. Equivalent fluid pressure of 35 PCF for retaining walls for drained on -site back fill. Coefficient of friction for the soil is 0.55 and passive soil (lateral bearing) pressure of 350 PCF. All bearing soil should be inspected by the engineer before concrete is poured. 2. The up hill footings of the accessory structure can be supported on two 24" square x 10" thick concrete footings, one near each comer of the building. These should be placed below the fill 12" into original undisturbed subsoil. The footings should be reinforced with (3) #4 rebars in each directions (3" clearance from soil). A 12" diameter Sonotiibe formed concrete column can be installed on top of these footings up to grade, this should be reinforced with (4) vertical #4 bars with a #3 horizontal hoops every 6". The excavated soil must be back filled and compacted over and around these footings up to grade. 3. Roof run-off should be directed to a catch basin in the existing conveyance system and tight - lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope. 4. A silt fence should be placed on the downhill side of the construction site to attenuate silt - laden run-off if necessary. Silt fences should be placed around catch basin inlets. Soil that is* to be removed and reused around the site should be kept away from the top of the slope. Soils not to be reused. on the site should be hauled off site to an approved location. 5. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope. should be protected with jute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soil needs to have topsoil spread and compacted and planted with'vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows: Common Name Percent by Weight Perennial ryegrass 40 Annual ryegrass 20 Red Fescue 40 This should be applied at a'hydro-seed rate of 1 LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10-20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: Trees*( 3-41 size; plant 6' o.c.) Shrubs*(to be 1-3' size; plant 2 foot O.C.) Vine Maple Kinnick-kinnick Big leaf maple Salal Nobles fir Snowberry Grand fir Vinca Minor Ore ' gon Grape Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. 1%, let I UTYOF EDMONDS - ENGWEERUNUDIVISKON SPECIAL INS111 ECTION AND TESTING AGREEMENT IVI, 'e`— %) 144, 1 1 K-- 1, 4 YXIT PERN11TH b1d20Y10775. DATE- Jauo 6,20,12 PROJECTSITE, ADDRE SS PROJECT NA[VIE: - 9"'Ave N - cab"1112 and SPE 1-"( - (C,- CfAL1N8PECTX01%TAC-'r1,'NCY. '�:One Win most be completed by each Spec011 Inspection Agency or Inspipetor. SPECYAL INSPECTIONS WtQUIREb: Special inspections are tequired for this prqjeet,,A applicable, in accordancQ.with Title IS Edinonds Col-IMILIDity Devclopnient Code (ECDC). When required. the project [Atist be installed/constrLicte(I per approvcd plans -in([ speciftcations. The owner or the registered design professional in charge shall einploy an independelit testinglinsli�ctiohi agency/special inspector to perforni require(( special ills] , )ections. The special inspect6r sliall be a qualified person with competence I"or inspecting the specific type of construction or operation reqoi.ling special iuspection. The owner, registered professional, contractor and special inspector/Efgericy shall provide a special inspcction i. eport dQtail ing colnWialic6 with approved plaris and specifications directly to the Engineering Division. WORN REQUIUNG SPECIAL INSPEC11ON: Special inspections will be required for the following categories of work: FOR SPECIFIC INFORMATION REGARD INC, REQUMED SPECIAL 1`14SPECTIONS SEE THE STATEMENT OF SPF'CfAL INSPECTION NOTED -AS A -CONDIT, ION-OWTHB-B'UIID*fNG-' PERMITANWOR ON111E APPROVED PLANS. Soil Conditions Prior to Placing Footings and. Durim, Construction 6V 0CWifV)T Retaining Wall Drainage 0�jPWWTII qAn, M", n BEFORE A PERMY.fCAN 13E 18813FO: The o,,vp�r and contli'�tZrraiia special irisf;6ct0,x ��fiiilfco,,Qt&trdt igreementand YCtUU11 to aPernhit Coordinator prior to P.Crinit issuance. AtIPROVAL OF SPE CIAL INSP8CTORS: Eacli special inspector shall be approved by the Engineering Divisiou prior to perCorrifing any duties or inspections. The credentials of the specific person perBorming the iii.spectioiislialibestib.ii-Litted. When applicable; the company p�rforniing inspectiobs must be accredited bythe American Association of State Higliway and'FransporLation Officials (AASHTO) R1 S. A. Duties and Respousibilifies, of the Speciall Inspector 1. OBSERVE WORK "flic.Special inspector shall observe the site work for conibrinwicu with the approved (stamped) plans -e to be perl'ormcd. Eii needed, -to coafirin that die work being and specifications. Special iii.SpCction� a, Completed 111cets spe F ci.icati.ons� ariclapproved ptalis. CADoctimejas and '3ettiii&,S\lllccojiiiell�Luc-,iI bitclilet f-ile.,,�\Cotileiit.Otittoolt\i2(i2LQK3\bld2Ot 10775- (2),citle Revised 00.06.201-2 Work rcqtiirihg special inspection and performance of spec.iat inspectors stlati. be nionitowd by thd F.rigilicering Division inspector. Engincering.111spectof approval must be obtained prior to placement of culicrete or other Mnular activities in addition -to that of the specii,11 inspector. 3. FINAL APPRO ' VAL The Brigincerina Diviii.on may provide finil inspectiou approval,after tile speciat inspecti0ii report(s) have been s-Lihiniftcd and accepted by the City. D. Owllel* Responsibififiet,, 1. Theproject owner or the enginecrorarchitect of record actingas the owner.'sagent.shall ftind special itispection services. E, lringineee or Architect of -Record RespoMMIRLie-3 1. Prepare Statement of Special impectioti.q. C -or work that inay not c liforn, to 11, 2. jZeview ffie� speciat inspection reports and provide cor.r ctive action f. 0 e approved Plans. ACKNOWLEDGE ME NTS I have rea(t and ergree to com pith the terins and condillons of tht� agreewlehl- Owner ntime (1)[Ca3c print or typc) Signature Date. -7// el-&, z (ple.ase print.bi, type) Signature (f( Special Inspector/Agenp h. )e (plefise pt Da'te Si -nature Engineer of Record n1140. i. J!/ (_ r I' U V < ;!7 Date 76 z- 1'2 iw'z- 11� Lz�. Return the origin,al,signed agreement to: City of Edmonds Development Services Dcpairtment 1215111 Avenne North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CIFFY OF EWV:10N�S E �N IN.EERING DIVISION: City Official Siginatare 1. Date Title- -V\A- CAL)eounicaLs ind SelthigAniccowiellkLocal S(!uin&s\Teiq)or1ry mteract F.iles\Ct)iitent.ou.ilool(\52Cr2LQI<,3\bld2Oi.107'15-- SI)ecial(iispecLiotiA&recnicnt-Ef\'G(2).doe Revised 06.106.2012 McConnell, Jeanie From: ericthuesen@frontier.com Sent: Monday, November 26, 2012 2:59 PM To: McConnell, Jeanie Subject: Fw: Fw: bld2011.0775-Thuesen Cabana Revision Attachments: inspection rev1Jpg; inspection pg3 revl.jpg Here is the signed inspection form Please advise how soon I can get the revised permit. I am hopping I can get it tomorrow. Eric ------ Forwarded Message ----- From: Chopelas & Associates <chopelasandassociates@gmail.com> To: "ericth uesen @frontier. com" <ericth u esen @frontier. com > Sent: Monday, November 26, 2012 9:57 AM Subject: Re: Fw: bld20110775-Thuesen Cabana Revision attached are page I and 3 that I signed, pg 2 was not affected. I presume they justmant to see my signature on it since there is no place for me to sign a revision. Peter On Mon, Nov 26, 2012 at 7:58 AM, ericthuesen@frontier.com <ericthuesengfrontier.com> wrote: Peter -Please sign and resend to me this am so I can talk to the City about release of the permit. Thx Eric ----- Forwarded Message ----- From: "ericthuesen(a)-frontier.com" <ericthuesena-frontier.com> To: Chopelas & Associates <chopelasandassociates(cD-qmail.com> Sent: Saturday, November 24, 2012 10:03 AM Subject: Fw: bld20110775-Thuesen Cabana Revision ----- Forwarded Message ----- From: "McConnell, Jeanie" <Mcconnell(cD_ci.edmonds.wa.us> To: "Eric Thuesen (ericthuesenA)frontier.com)" <ericthuesenA_frontibr.com> Cc: "Clugston, Michael" <cluq�tonA_ci.edmonds.wa.us>; "Thornquist, Linda" <Thornquist(cD_ci.edmonds.w a.us> Sent: Wednesday, November 21, 2012 11:34 AM Subject: b1d20110775-Thuesen Cabana Revision Eric, I've signed off on the cabana plan revision which shows the access road, but need for you and your engineer of record to date and initial the attached revised special inspection and testing agreement. Our permit coordinators can process the permit for issuance once this revised form is returned to us with signatures. L] Thank you, Jeanie Jeanie McConnell Y Engineering Program Manager City of Edmonds I Public Works Department 121 5th Avenue North, Edmonds WA 98020 425.771.0220 x1338 I http://www.edmondswa.jzov/ "Never doubt that a small group of thoughtful, committed citizens can change the world. Indeed, it is the only thing that ever has." - Margaret Mead<http://www.quotationspage.com/quotes/Marparet Mead> Thank you, Jeanie Jeanie McConnell Y Engineering Program Manager City of Edmonds I Public Works Department 121 5th Avenue North, Edmonds WA 98020 425.771.0220 x1338 I htt-p://www.edmondswa.gov/ "Never doubt that a small group of thoughtful, committed citizens can change the world. Indeed, it is the only thing that ever has." - Margaret Mead Mead/> Peter Chopelas, PE Engineering & Design Services 307 N. Olympic Ave, Suite 208 Arlington, WA 98223 (360) 653-4615; Chovelasandassociate ail.com October 25, 2012 Mick Clugston, AICP City of Edmonds Development Services Department 1215"' Ave N. Edmonds, WA 98020 Subject: Order to Correct, October 9'h, 2012; 509 9�h Ave N. Edmonds (BLD20110775) Dear Mr. Clugston, 'Attached is the revised Geotechnical report and mitigation plan to incorporate the temporary access road on the west side of the construction site into the recommendations. I had observed these changes during the various site visits done in July and August, and approved them because of the unforeseen site conditions as allowed for under the recommendations of the original geotechcinal report and mitigation plan. At the time, it was anticipated that slope restoration, within the scope of the existing recommendations, would have to be done. These kinds of changes during construction on a difficult site are not unusual. Nevertheless, specific information is now included into the revised geotech report and site plan. . Please extend the Correction dead line since I was unable to respond any sooner. Mr. Theuesen had forwarded the Order of Correction to me over ten days ago and it was in my plans to provide the revised information in a timely manner. However I became very ill and was bedridden during the time I had planned preparing the enclosed documentation and could not meet the dead line. It was no fault of Mr. Theusesn, he provide the information I a timely manner attempted to make contact with me several times. It could not be helped. If you have any questions, please feel free to call or email me directly. 4( I W!V, Peter Chopelas, PE STREET FILE 2-9,2012 SUILDING DEPARTMENT CITY OF EDMONDS APes Chopelas, PE Engineering & Design Services 307 N. Olympic Ave, Suite 208 Arlington, WA 98223 (360) 653-4615; Chopelasandassociates@gmail.com 7 Geotechnical Report, March 23, 2012 Revised (1): May 15, 2012 Revised (2): October 25, 2012 Eric Thuesen 509_9th Avenue N. STRE T FILE Edmonds WA 98020 E Ericthuesen@frontier.com 1-425-772-9401 Subject: g-e-dtechnical investigation for plan ck # 2011-0775 accessory structure (cabana) at the above address. Revision 2 incorporates mitigation and restoration plan for added access road on west side of the subject site. SUMAlARY A geotechnical investigation of the above property was performed to address slope stability, erosion -control and drainage issues. This sloping site has been extensively altered due to . previous construction activities including extensive cut and fill of the slope. A small accessory structure (cabana) and a retaining wall is proposed to be built below the residence at the top of slope below the home. The investigation consilsted. of a site inspection to, examine soils and site conditions and to take measurements on the sites. A review of published material on local geology from die USDA Soil Survey of Snohomish County, and a review of the geotechnical report done by Eiennis Bruce PE, dated Jan 13th, 2005 for this site. . The investigation f6und that the site can be made satisfactory with deep foundations for the proposed accessory building, and a retaining wall with footings deep enough to get below the fill, and the use of surface stabilization measures. The building site for the cabana is on shallow old fill placed at tile top of the slope to make the back yard terrace larger. There is an existing site drainage system, including yard drains, and a conveyance system that transports all roof and drive -way run-off to the base of the hill. The fill, though stable for landscaping features, is not suitable for permanent buildings. Therefore the proposed building and retaining wall should be built on foundations deep enough to bare on the original undisturbed subsoil. This will allow the proposed development with a generous safety factor of 1.5 or greater. These measures will reduce risk of landslides, increase slope stability and will not increase surface water discharge, sedimentation or erosion on downstream sites. This development will not increase surface water discharge, and it will not decrease slope stability but rather increase stability and it will not adversely impact other critical areas. Durin- the construction phase a temporary access road was constructed on the west side of the site for movement of construction equipment and supplies to the proposed structures. This access.road is acceptable for tempo ss, and must be fully removed and soil stabilizing s� mea,sur'es be taken after the corRVe M,�ni �tion to mitigate the disturbed soil. Peter Chopelas PE . . . . . . . .... tol REVUSION 279711 I 4V C-0 OCT 2 9 'VAL BUILDING DEPARTMENT CITY OF EDMONDS Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal sewer and a public water supply, and with an existing residence and garage built on a terrace on a sloping site. There is a proposed accessory building of 320 SF, with a 360 SF attached deck, a - retaining wall and back fill to enlarge the useful backyard, placed at the top of a steep slope below the existing residence. The building site is about 160 feet from the toeof the slope, and about 50 feet in elevation above it. The foundation will be deep enough to reach below the old fill to bear on original undisturbed soil. These are Allowed Activities in a critical area per 23.80.090. B (1). Added to this project is a temporary access road from the west for construction vehicles to use during the construction phase, and than removed, soil stabilized and replanted. 23.40.120 Mi , tigation sequencing 1. The impact cannot be avoided since it is the property owner's desire to increase the safety factor of the slope and enlarge the useful available back yard area by adding engineered fill and building the engineered stepped foundation cabana on the edge of a small level terrace. 2. The im pacts are minimized by building a modest building and enlarging the useful area of the back yard by about 300 SF. Site disturbances on the slope should be kept to a minimum during construction, it should be done during the dry season, and all exposed soil will be covered during the construction phase. Both temporary and pennanent soil stabilizing measures are recommended. 3. There are no impacts to welland nor to any habitat area since none are disturbed. The site will be more stable and surface vegetation restored after the project is completed. . 4. Both the foundation and retaining structure are engineered structures and will result in a safer, more stable slope condition than the existing site conditions. 5. The recommendations for the proposed project will result in long term slope stability. Recommendations include installing stabilizing engineered structures, protecting and maintaining the vegetation on the slope, and to minimize unnecessary site disturbances. 6. No compensation for impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas are required since none are disturbed. 7. Monitoring the hazard will be done during the construction since the soil conditions have to be inspected prior to placing the footings, and during the construction to verify design conditions are met. Design adjustments may be made to minimize any hazards. ECDC 23.40.240 Unauthorized critical area alterations and enforcement. ) The addition of an access road to the construction site was done to minimize access cost and reduce damage to other, up -slope existing site features. This kind of field changes are not unusual in construction sites with difficult access, it was discovered after extensive excavation that the old fill was much deeper and extensive than determined by the multiple soil log holes and sampling done prior to construction. There was also a large amount of contamination and old construction debris buried much deeper than anticipated. This discovery necessitated a number of field changes to safely - accommodate the deep and poor quality fill, and to provide alternative access since excavations were now too deep to access from the top of the site as originally planned. Because of these changes the City of Edmonds issued an Order to Correct. This is to incorporate specific instructions into this Geotech report and provide for mitigation of the disturbed soil on the steep slopes. This temporary access road was observed during several site inspections and it was found to be stable and acceptable for its intended temporary use. Specific slope repairs and migrations are recommended when the construction is completed. ECDC 23.40.240 C. Minimum Performance Standards for Restoration. . "2. For alterations toflood and geological hazards, thefollowing minimum performance standards shall be metfor the restoration of a critical area; provided, that if the violator can demonstrate that greater safety can be obtained, these standards may be modified.-. a). The hazard shall be reduced to a level equal to, or less than, the predevelopment hazard;" The recommended mitigation will provide lower a reduced level of hazard.since much of the slope below the construction site was uncontrolled and contaminated fill, with no specific planting with regard to soil stabilization. The disturbed slope will be compacted, cut to an acceptable grade, top soil laid and specific plants recommended that will provide long term slope stability. "b) Any risk ofpersonal injury resultingftom the alteration shall. be eliminated or minimized," Adding the temporary lower access road on the west reduces the risk to equipment operators since it provides a clear safe path to the construction site, with lower risk of slope failure and lost of control of construction equipment as compared to accessing the site from above. The slope stabilization measures will also leave the slope in a much more stable and safer condition than leaving it in it original condition. "And c) The hazard area and buffers shall be replanted with native vegetation sufficient to minimize the hazard." The area will be planted with native vegetation that is deep rooting and suitable for* stabilizing soils, the underlying soil will also be compacted and suitable top soil and fertilizer to ensure health vegetative cover is established. The restored slope onthe west of the site will be in safer, more stable and better than its original condition. Site Conditions The terrain slopes steeply to the west at about 32 percent average grade from a near level terrace on the east half where the existing residence is located. The terrace has existing lawn and landscaping and there is mix of grasses and landscaping shrubs and small to medium trees on the slope. There is no significant surface drainage on the site, and no seepage on the site. There is an existing drainage and conveyance system to transport surface discharge from the roof tops and driveway to the base of the slope to the west. The proposed construction site is on overly steep slopes at about 50 percent grade, which was created by placement of fill on the slope from the spoils of the foundation excavations when the original house was built. Deep uncontrolled fill and depris was found all along the slope during site excavations. Local Geology The subject site lies along a slope forming the edge of the highland plateau of the Edmonds area. The general stratigraphy (soil layering) of the area is characterized by fluvial and glacio-fluvial sediments from sea level to around 200 feet, with glacial till and sand deposit plains that make up the surficial sediments on most of the plateau. The USDA Soil Survey of Snohomish County maps the soil as Everett gravelly sandy loam and Alderwood gravelly sandy loam. The Everett soil is deep excessively drained soil on terraces and outwash plains. It is formed in glac ial-out wash. The sub -soil is dark brown gravelly sandy loam down to about 60 inches, with increasing gravel at the deeper depths. The Alderwood gravelly sandy loam is moderately well drained soil on till plans, moderately deep over a hardpan, and formed in glacial till. Both of these soils are very stable and suitable for building site development. This soil has good strength and is not prone to slumps or landslides. It is subject to surface erosion when exposed to the weather and measures are required to prevent erosion. This soil is not prone to liquefaction. The site shows no evidence of landslides or deep soil instability. There were some minor tension cracks in the soil near the top of the slope, but this was old fill that has been settling and causing surface irregularities. This does not pose a hazard to this site or the adjoining site,and the' slope will be reinforced with the. addition of the proposed structures. There is no flooding risk on this property. There are no wetlands or surface water on this property, however several hundred feet down slope there is a wetland at the toe of the slope. Geotechnics Surface soils have been inspected over most of the site and on the slopes by visual inspections. The underlying undisturbed soil on the subject site is deep silty sand, this is old alluvial outwash. The soil on the proposed building site below the existing home is undifferentiated fill I to 4 feet deep, likely the spoils from the house site excavations. It is a mix of sand and gravel and has organic material and other debris mixed into it. This was placed at the top of the slope, over steepening the upper 10 feet or so of the slope. Soil log 1 Soil log 2 Soil log 3 Soil log 4 0-12" mixed fill 0-36" mixed fill 0-48"+ mixed fill 0- 18" fill 12"+ sandy loam 36"+ sandy loam 18"+ sandy loam Soil log table Subsequent site excavations has revealed much deeper uncontrolled old fill and debris much deeper than anticipated since the initial soil log explorations. The underlying sub- soil are as earlier identified, well drained and stable Everett gravelly sandy loam. Slope stability:. Analysis of the natural grade of the steeper parts of the site using the Singh diagrams indicates that the slope shows a Factor of Safety of 1.8. This reduces to about 1.6 for dynamic seismic conditions. This indicates a stable slope with a large safety factor over the 1.5 and 1.2 minimum requirements respectively. The upper filled slope is also currently I stable, but with a lower safety factor of about 1.2. This is acceptable for landscaping features, but deeper footings must be used to get into the underlying original subsoil. The soil properties of the 0 0 undisturbed Everett soil is as follows: density (gamma)= 130 PCF; Cohesion (C)= 100 PSF, height of the slope is 50 feet. Erosion: All of the existing site is well protected from erosion with established vegetation All of the slopes over 30 percent on this site is subject to severe erosion if the soil is exposed. Minimize disturbing any vegetation on the slope. Any exposed soil on the site must have deep rooting ground cover installed as soon as practical, avoid concentrated surface flows on the slopes, and to transport by tight -line roof and driveway runoff to the base of the slope through the existing drainage system. 23.80.060 and 23.80.070 Development standards. The recommendations in the following section will achieve the following: 1. It will not increase the threat of the geological hazard to adjacent properties beyond predevelopment conditions; and will reduce them since it will improve the safety factor. 2. It will not adversely impact any other critical areas. 3. These recommendations are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than predevelopment conditions; and 4. All are certified as safe as designed, and under anticipated conditions, by a qualified engineer licensed in the state of Washington. Note that construction buffers for the proposed development is zero. The. proposed changes will stabilize the slope to bring the safety factor well above the 1.5 minimum, so no buffers are required for this project. Therefore section 23.80.070 (1) does not apply. However, it is recommended to keep heavy construction equipment back from the top of the slope at least 10 feet during construction. This proposed development is certified to: I a. Reduce, and not increase surface water discharge or sedimentation to adjacent properties beyond predevelopment conditions; b. It will increase, and not decrease slope stability on adjacent properties; and c. These alterations will not adversely impact other critical areas; 3. Design Standards. Development within an erosion or landslide hazard area and/or buffer shall be designed to meet the following: a. The proposed development has a design safety factor of 1.5 or above static, and 1.2 and above dynamic, after the recommendations are accomplished. There is no reduction in the safety factor for the site, or to any adjacent properties. b. The Structures and improvements are placed to avoid geologically hazardous areas and to improve the slope safety factors, and will have no affect on other critical areas; c. The proposed structures and improvements minimize alterations to the natural contour of the slope, and foundations are tiered where possible to conform to existing topography; temporary alterations to the slope will be restored to the original natural contour of the slope where necessary. d. Structures and improvements are located to preserve and restore the most critical portion of the site and its natural landforms and vegetation; e. The proposed development does not result in greater risk or a need for increased buffers on. neighboring properties; f. Retaining walls are used to allow the maintenance of existing natural slope rather than graded artificial slopes; g. The development minimizes impervious lot coverage, the proposed, building is modest in size- 4. Vegetation Retention. All vegetation on the slopes shall be left undisturbed outside of the construction area. All disturbed slopes will be restored with native vegitaion. 5. Seasonal Restriction. Clearing shall be allowed only from May I st to October I st of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions; 6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from erosion or landslide hazard area are prohibited. All roof and surface discharge shall be collected and tight -lined to the existing site drainage system where it is conveyed to an approved discharge point where there is no erosion hazard. 7. Prohibited Development. No On -site sewage disposal systems are proposed for the site. Recommendations The proposed building location can be used with a reasonable assurance of long term slope stability and safety to the building if the following recommendations are followed: I . Conventional footings may be used as long at it is placed a minimum of 12" into the original undisturbed sub -soil below the old fill. Bearing capacity is 2000 PSF. Equivalent fluid pressure of 35 PCF for retaining walls for drained on -site back fill. Coefficient of friction for the soil is 0.55 and passive soil (lateral bearing) pressure of 350 PCF. All bearing soil should be inspected by the engineer before concrete is poured. Revised recommendations: because of the depth to competent soil, it will be less site disturbance and provide for more reliable footings to.use driven pin piles. 2" schedule 80 steel pipe should be driven to refusal with a hand held jack hammer. Refusal is achieved with a driven rate of less than I "per minute. Bearing capacity for each pile is 4,000 lbs. Driven piles were inspected for refusal before footing placement and found to be acceptable. 2. The up hill footings of the accessory structure can be supported on two 24" square x 10" thick concrete footings, one near each comer of the building. These should be placed below the fill 12" into original undisturbed subsoil. The footings should be reinforced with (3) #4 rebars in each directions (Y clearance from soil). A 12" diameter Sonotube formed concrete column can be installed on top of these footings up to grade, this should be reinforced with (4) vertical #4 bars with a #3 horizontal hoops every 6". The excavated soil must be back filled and compacted over and around these footings up to grade. Revised recommendation: driven piles are also used for all footings since the depth of the old fill was excessive. 3. Roof run-off should be directed to a catch basin in the existing conveyance system and tight - lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope 4. A silt fence should be placed on the downhill side of the construction site to attenuate silt - laden run-off if necessary. Silt fences should be placed around catch basin inlets. Soil that is to be removed arld reused around the site should be kept away from the top of the slope. Soils not to be reused on the site should be hauled off site to an approved location. 5. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope should be protected with jute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soil needs to have topsoil spread and compacted and planted with vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used. for erosion control, should be as follows: Common Name Perennial ryegrass Annual ryegrass Red Fescue Percent by Wei2ht 40 20 40 This should be applied at a hydro -seed rate of I LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10-20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: Trees*( 34' size; plant 6' o.c.) Shrubs*(to be 1-3' size; plant 2 foot O.C.) Vine Maple Kinnick-kinnick Big leaf maple Salal Nobles fir Snowberry Grand fir Vinca Minor Oregon Grape Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. Revised recommendation: where temporary access with heavy equipment was required on any of the steep slope of the site, compacted temporary fill slopes can stand at 2 to I and the surface be stabilized with quarry spalls and crushed rock. During periods of inclement weather, all exposed soil should be covered with mulch, straw, jute mat or weighted plastic sheet. Under no circumstances should concentrated surface drainage be allowed to discharge over the slopes. These temporary access roads must be removed by the completion of construction, all grades on the slope must be restored to the original natural grade contours (before the old existing fill) of no more than 2 to 1, all surface soils machine compacted, and top soil spread with mulch and jute mate used to temporary hold top soil in place until vegetation is established. Plants from the above list must be installed on all disturbed areas on the slope. 4t I C 0 9 Peter Chopelas, PE Engineering & Design Services 307 N. Olympic,Ave, Suite 208 Arlington, WA 98223 (360) 653-4615; Chopelasandassociates@gmail.com Mitigation Plan May 17, 2012 per section 23.40.130 Revised: October 25, 2012 Eric Thuesen 509-9'h Avenue N. Edmonds WA 98020 Ericthuesen@frontier.com Subject: Slope stabilization measures for plan ck # 2011-0775 accessory structure (cabana) at the above address Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal sewer and a public water supply, and with an existing residence and garage built on a terrace on a sloping site. There is a proposed accessory building of 320 SF, with a 360 SF attached deck, a retaining wall and back fill to enlarge the useful backyard, placed at the top of a steep slope below the existing residence. The building site is- about 160 feet from the toe of the slope, and about 50 feet in elevation above it. Goals and Objectives The project will reduce potential landslides, stabilize the existing slope, enhance erosion control on the steep slopes, and will enhance and add to native vegetation on the -hillside. 1. Potential impacts are uncontrolled run-off, erosion and destabilizing the slope during construction phase. There is new impervious area proposed and the additional loads on the slopes created by the proposed structures. These will be mitigated by using an engineered design, construction timing, limiting disturbing the slope to betwe en May I and October I't, use of a silt fence on the down hill side of the site disturbance, cover any exposed soils on the slopes within 48 hours. -Permanent measures will be to direct roof run-off to the existing stormwater conveyance system, and replanting disturbed soil with native vegetation suitable for soil stabilizing surface soils. There are no wetlands, habitat, or shorelines affected by this project, so no habitat mitigation measures are necessary. However, replanting of the hillside with native vegetation will enhance the natural environment and provide for improved habitat. 2. Slope stability measurements were done using traditional Singh diagrams. This has been in use for many decades and has proven to result in safe and stable slopes. This methodology results is a more stable slopes as indicated by more modem analysis methods. 0 0 3. If all recommendations are followed, the likelihood.of success are estimated to me 98 percent or greater. The methods proposed have long histories of successful outcomes. 4. Only steep slope areas are affected by this proposal, all mitigation is oriented towards steep slope development. All off site impacts will be prevented by following the recommendations in the Geotech report. B. Performance Standards. Regular inspections of the site must be made to insure that off site run-off avoided by containing all surface run-off on -site during construction. And that those construction recommendations are followed. C. Detailed Construction Plans: These are detailed in the Recommendations section of the Geotech report. These include: I . Conventional grading and footings recommendations. And all bearing soil should be inspected by the engineer before concrete is poured. Revised recommendations: because of the depth to competent soil, it will be less site disturbance and provide for more reliable footings to use driven pin piles. 2" schedule 80 steel pipe should be driven to refusal with a hand held jack hammer. Refusal is achieved with a driven rate of less than I "per minute. Bearing capacity for each pile. is 4,000 lbs. Driven piles were inspected for refusal before footing placement and found to .be acceptable. 2. Roof run-off should be directed to a catch basin in the existing conveyance system and tight -lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope. 3. A silt fence should be placed on the downhill side of the construction site to attenuate silt -laden run-off.if necessary.. Silt fences should be placed around catch basin inlets. Soil that is to be removed and reused around the site should be kept away from the top of the slope. Soils not to be reused on the site should be hauled off site to an approved location. Clearing shall be allowed only from May I st to October I st of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions. 4. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope should be protected withjute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soi ' I needs to have topsoil. spread and compacted and planted with vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows Common Name Perennial ryegrass Annual ryegrass Red Fescue Percent by Weight 40 20 40 This should be applied at a hydro -seed rate of I LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10- 20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: I - Trees*( 3-4' size; plant 6' o.c.) Shrubs*(to be 1-3' size; plant 2 foot O.C.) Vine Maple Kinnick-kinnick Big leaf maple Salal Nobles fir Snowberry Grand fir Vinca Minor Oregon Grape Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. Revised recommendation: where temporary access with heavy equipment was required on any of the steep slope of the site, compacted temporary fill slopes can stand at 2 to I and the surface be stabilized with quarry spalls and crushed rock. During periods of inclement weather, all exposed soil should be covered with mulch, straw, jute mat or weighted plastic sheet. Under no circumstances should concentrated surface drainage be allowed to discharge over the slopes. These temporary access roads must be'removed by the completion of construction, all grades on the slope must be restored to the original natural grade contours (before the old existing fill) of no more than 2 to 1, all surface soils machine compacted, and top, soil spread with mulch and jute mate used to temporary hold top soil in place until vegetation is established. Plants from the above list must be installed on all disturbed areas on the slope. D. Monitoring Program. Inspections should ' be doiie during the construction at each phase, and upon completion of the replanting of the exposed soil. It should not be necessary to monitor the health of the vegetati ' on for more than one year after completion. If the plants are growing, healthy, and providing ground cover, no further action should be necessary. E. Contingency Plan. Project modifications may have to be done if unforeseen soil conditions occur during the soil and excavation inspections, or if unusually wet weather or soil conditions are encountered. Note: the revised recommendations above were as a result of finding unforeseen soil conditions after construction excavations. These kind of contingencies were accommodated within the original recommendations. F. Financial Guarantees. Applicant will post bonds, or a pledge of financial responsibility (at the director's option) to ensure mitigation, maintenance, and monitoring. [Ord. 3527 § 2, 2004]. The size of this project is not sufficient to require extensive bonds. 0 CITY OF EDMONDS DEVELOPMENt SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 NOTICE OF VIOLATION AND MONETARY FINE Location of Violation (Address and/or description of location): Parcel Numbers 27032400225200, and 27032400225 100 which are addressed as 514 8h Avenue North and 509 9th Avenue North, Edmonds, WA 98020 Issued To: Eric Thuesen Address Of Person This Order Is Issued To: 509 Wh, Avenue North, Edmonds, WA 98020 Code Sections Violated: Edmonds Community Development Code (ECDC) ECDC 23.40.040 �- Jurisdiction; ECDC 23.40.220 — Allowed Activities; ECDC 23.40.230 — Exemptions; ECDC 23.80.040 — Allowed activities — Geologically hazardous areas. Description of Viodation: As note d in the associated Order to Correct issued on October 9, 2012, a building p�rmit for the construction of a cabana and retaining wall at 569 91h Avenue North was issued to Mr. Thuesen on June 28, 2012 (BLD20110775). At a site inspection on July 30, 2012, it was noticed that a dirt access road had been created from 8th Avenue North to the west of the cabana site apparently in order to provide access for construction vehicles to get to the work area. The area west of the cabana construction site is a steep slope area qualifying as both erosion and landslide hazar/d areas, as was indicated in the geotechnical report associated with the cabana permit. All alterations to critical areas (i.e. erosion and landslide hazard areas) must be approved by the City per ECDC 23.40.220, unless the activity is exempt per ECDC 23.40.230. Based on subsequent review of the building permit information, however, it was found that the dirt access road was not shown on the approved site plan for the building permit nor was it discussed or -mitigated for in the associated geotechnical report. In short, the creation of the dirt access road was not within the scope of the underlying permit for the cabana and retaining wall., The dirt access road was therefore created in an erosion and landslide hazard area without first obtaining the proper approval from the City in violation of city code. (ECDC 23.40.220; ECDC 23.40.230; ECDC 23.80.040). A subsequent field inspection on September 21, 2012 verified these conditions at the site. Corrective Action Required: In addition to the timely payment of any monetary penalties imposed as a result of this Order, Mr. Thuesen shall submit a restoration plan for the site as a revision to BLD20110775 as was described in the associated Order to Correct issued on October 9. 2012. The dirt road area shall remain unused and shall remain stabilized until a revision to BLD20110775 is approved by the City. In accordance with ECDC 23.40.240.13, the restoration plan for the dirt road area must meet the minimum standards identified in ECDC 23.40.240.C.2. The plan, and an updated geotechnical report, must meet the development criteria found in ECDC Chapter 23.80, specifically in ECDC 23.80.060 and 23.80.070. Any and all work required to restore. the property, including all work done in preparing the restoration plan itself, shall be paid for by Mr. Thuesen in accordance with ECDC 23.4.0.240.A. ----------- -- ------------- ....... -------------- - I I P a - e 0 .0 The restoration plan, updated geotechnical report, and any other required information shall be submitted as a revision to the original cabana building permit (BLD20110775). If an access road from the west is proposed to be used again in the future, Mr. Thuesen shall include that information in the revision 'showing the road on the plans while updating the associated geotechnical report to discuss the construction of the road and its impact on the steep slope area, including post -cabana construction mitigation for the road area. No vehicles shall access the cabana site from the west until a revision to building permit BLD20110775 and the associated geotechnical report are reviewed and approved by the City. Correction is Required no later than: November 5, 2012. As noted in the associated Order to Correct issued on October 9, 2012, correction of the referenced violation was required by October 23, 2012. VAiile it is noted that the Applicant has stabilized the site using best practices for erosion and sediment control, the City has not received the required restoration plan prepared as part of a revision to BLD20110775. Therefore, the City of Edmonds is issuing this Notice of Civil Violation pursuant to ECDC 20.1.10.040.13 and monetary penalties will begin to accrue on October 24, 2012. A $100 per day fine will be assessed in accordance with ECDC 20.110.040.F beginning on October 24, 2012, for each and every day or portion of a day on which the violation continues. If any required work to correct the violations(s) in this Order is not commenced or completed within the time specified by this notice and order, the City -may proceed to file a lawsuit to obtain a warrant to abate the violation and cause the work to be done. and charge the costs thereof as a lien against the property and as a joint and several personal obligation of any persons responsible for code compliance. Or, the City may file a lawsuit against the homeowner to obtain a warrant for abatement or an injunction to stop continuing violation(s). r If any assessed penalty, fee or cost is not paid on or before the due date, the City may charge the unpaid amount as a lien against the property where the civil code violation occurred if owned by a person responsible for code compliance and as joint and several personal obligations of all persons responsible for code compliance. Costs of pursuing code enforcement and abatement incurred to correct a code violation that exceed the amount of the penalty may also be assessed against the person to whom the notice and order is directed. Such costs include legal and i ' ncidental expenses to the extent that these costs exceed the amount of the penalty paid. Such costs are due and payable thirty days from mailing of the invoice. Appeal of This Order: In accordance with ECDC 20.110.040.C, this decision is appealable to the City of Edmonds Hearing Examiner by filing a complete appeal application including written notice of appeal with the Development Services Director no later than November 5, 2012 at 4:30 pm. The gppeal filing fee is $705 and full payMent of this fee must accompany the written notice of gappeal. The Notice of Appeal shall comply with the rules set forth in the ECDC or the appeal may be dismissed by the Hearing Examiner. Enforcement of this Notice and Order shall be stayed as to the appealing party during the pendency of any administrative appeal, except when the Director determines that the violation poses a significant threat of immediate and/or irreparable harin and so states in tile Notice and Order. Upon motion of the City, the Hearing Examiner may assess the costs of an appeal hearing including but not limited to, the hearings examiner's fees and reasonable costs of staff time, if the Hearing Examiner finds the appeal was frivolous. Any appellant who fails to appear at his or her appeal hearing, unless for good cause shown, shall be responsible for the hearings examiner's costs. Failure to Appeal This Order: Failure to appeal a Notice of Civil Violation and Order as provided in this subsection constitutes as waiver of all rights to an administrative hearing and determination of the - --- - --------- - ----- - ----- -- ------- -------­------ - - ------- — ------ ... .... 2 P a e 0 0 matter. Failure to appeal shall render the Notice of Civil Violation and Order a final determination that the conditions described in the'Notice and Order existed and constituted a civil code violation, and that the named party or parties is (are) liable as a person(s) responsible for code compliance. This Notice and Order are imposed without prejudice to any other civil, criminal, injunctive or other remedy and/or penalty available to the City. Date Posted: N/A Date Mailed: October 24, 2012 Date Served: N/A Issuing Party: Mike Clugston, AICP Title: Associate Planner Signature: !2 3 1 P a g e CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 121 5th Avenue North, Edmonds, WA 98020 ORDER TO -CORRECT Location of Violation (Address and/or description of location): Parcel Numbers 27032400225200, and 27032400225 100 which are addressed as 514 8b Avenue North and 509 91h Avenue North, Edmonds, WA 98020 Issued To: Eric Thuesen Address Of Person This'Orderls Issued To: 509 9th Avenue North; Edmonds, WA 98020 Code Sections Violated: Edmonds Community Development Code (ECDC) ECDC 23.40.040 — Jurisdiction; ECDC 23.40.220 — Allowed Activities; ECDC 23.40.230 — Exemptions; ECDC 23.80.040 — Allowed activities — Geologically hazardous areas. Description of Violation: A building permit for the construction of a cabana and retaining wall at 509 9th Avenue North was issued to Mr. Thuesen on June 28, 2012 (BLD20110775). At a site inspection on July 30, 2012, it was noticed that a dirt access road had been created from 8 1h Avenue North to the west of the cabana site apparently in order to provide access for construction vehicles to get to the work area. The area west of the cabana construction site is a steep slope area qualifying as both erosion and landslide hazard areas, as was indicated in the geotechnical report associated with the cabana pen -nit. All alterations to critical areas (i.e. erosion and landslide hazard areas) must be approved by the City per ECDC 23.40.220, unless the activity is exempt per ECDC 23.40.230. Based on subsequent review of the building permit information, however, it was found that the dirt access road was not shown on the approved site plan for the building permit nor was it discussed or mitigated for in the associated geotechnical report. In short, the creation of the dirt access road was not -within the scope of the underlying permit for the cabana and retaining wall. The dirt access road was therefore created in an erosion and landslide hazard area without first obtaining the proper approval from the City in violation of city code. (ECDC 23.40.220; ECDC 23.40.230; ECDC 23.80.040). A subsequent field inspection on September 21, 2012 verified these conditions at the site. Corrective Action Required: Because the creation of the dirt access road by Mr. Thuesen was not within the scope of the permit he obtained for the construction of the cabana and retaining wall, it is considered an alteration to a critical area without approval of the City. ECDC 23.40.240 governs the process Mr. Thuesen is required to follow in order to correct the violation. In accordance with ECDC 23.40.240.A, Mr. Thuesen, and his contractors, shall immediately stop using the dirt road east of the rock spall-covered access and stabilize the area in accordance with the code. The stabilization requirements are contained within the 2005 Department of Ecology stormwater manual, as implemented by ECDC 18.30. This manual provides that the dirt road area shall be stabilized with appropriate erosion and sediment control BMPs including,but not limited to, silt fencing, jute mat, straw or hydroseeding in accordance with seasonal soil stabilization requirements. -1 Pursuant to ECDC 23.40.240.B, all use of this dirt road shall cease until Mr. Thuesen prepares a restoration plan in accordance with the provisions of this code and that plan is then approved by the Director. In accordance with ECDC 23.40.240.B, the restoration plan for the dirt road area must meet ---------------------------- --- ----------------------- ------------------------------- ­­­­ ----------------------------------- - ------- I I P 6 C, e the minimum standards identified in ECDC 23.40.240.C.2. The plan, and an updated geotechnical report, must meet the development criteria found in ECDC Chapter 23.80, specifically in ECDC* 23.80.060 and 23.80.070. Any and all work required to restore the property, including all work done in preparing the restoration plan itself, shall be paid for by Mr. Thuesen in accordance with ECDC 23.40.240.A. The restoration plan, updated geotechnical report, and any other required information shall be submitted as a revision to the original cabana building permit (BLD20110775). If an access road from the west is proposed to be used.again in the future, Mr. Thuesen shall include that information in the revision showing the road on the plans while updating the associated geotechnical report to discuss the construction of the road and its impact on the steep slope are�a, including post -cabana construction mitigatio'n for the road area. No vehicles shall access the cabana site from the west until a revision to building permit BLD20110775 and the associated geotechnical report are reviewed and approved by the City. Correction is Required no later than: October 23, 2012. As noted above, the use of the dirt road area shall cease immediately and the road area shall be stabilized with appropriate erosion and sediment control. A restoration plan (prepared as part of a revision to BLD20110775) shall be filed with the City by October 23, 2012. If the required information is not received by October 23, 2012, a Notice of Civil Violation will be issued pursuant to ECDC 20.410.040.13 and monetary penalties will begin to accrue on October 24, 2012. A $100 per day fine will be assessed in accordance with ECDC 20.110.040.17 beginning on October 24, 2012, for each and every day or portion of a day on which the violation continues. A Notice of Civil Violation may be appealed in accordance with ECDC 20.110.040.C. This. Order to Correct is imposed without prejudice to any other civil, criminal, injunctive or other remedy and/or penalty available to the City. Date Posted: - N/A Date.Mailed: NA Date Served: October 9. 2012 Issuing Party: Mike Clugston, AICP Title: Associate Planner Signature: 2 1 P a e 'AA [AM 001, 11 44, " Av,;: ;�11 0 Alf" iw ;17 4 �Atl 1� 4 1 1� j�l , Y top 1., Pp. i .,- 7% lo j I % I 'A' St Tit, I Ilk jr P4, vu Al Ye I Cejl ay. L-01u, 1"P, A 14 4A y"y 71 41 17 mom, 26 E V I' ELOPA04EI C U1 VT S VTERE:i�VICES E D SPECIAL INSPECTION AND TESTING AGREEMENT 31�; Permit #: 90 2-0 1101 Project: c Co C�� Prior to issuance of a permit, this form must he completed in its entirety and returned to the Cityfor U)- approval. The completedform must have signatures of acknowledgment by allparties. -;-4 Special Inspection Firm and Special DUTIES AND RESPONSIBIELITIES Inspectors: CITY COPY C\Aopz� vC, The Special Inspection f= of will perform special inspection for the fol lowing types of work separate forins must be submitted if more than one firm is to be --n employed): amp== r"O" • Reinforced Concrete 0 Spray applied Fireproofing M • Bolting in, Concrete 0 Smoke Control Systems • Prestressed Concrete 0 Lateral Wood • Sbotcrete 0 Structural Observation • Structural Masonry Grading/soils e�fo' ��c C" • Structural Steel/Welding '94 Other bCzk4-"C'J J� P-r'of -e<) (*-10V C �kddk • High Strength Bolting 0 Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resurne must show fhat the inspector and the firin are qualified by education and experience to perform. the work and testing required by the project design and specifications. The work shall be inspected for conforniance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved bythe City. hispection recor ds shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor forresolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any rionconforming work and resolution of noriconforining items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. LABuilding New Folder 201 fforrns\Special inspection forin.doel0/21/201 .01 STREET FILE RECEIVED IN 26 2012 'DEVELOPMENT SERVICES COUNTER Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the. jobsite far the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties, The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is,responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. BuildinjZ De�me�nt The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreementand the approvedplans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Desi�!n Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process 'in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMMNT A failure of the special inspector or firm to.perform in keeping with the requirements of the UBC, the approved plans and this document, may void this agreement and th e Building Official's approval of the special inspector. 0 hi such a case a new special inspector and/or'firrn would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result 'in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLE DGMIENTS I have read and agr ee to comply with the terms and conditions of this agreement. Date 6 12,112-OIZ— Owner: Signature ��,6 E�� -ure Date: Contractor: S ex,� Signat Axch./Ena: 10. PQ-lh& PC- Signature Date: &LMSpecial Jnsp. Signature*,� D ate: Lie I ACCEPTED FOR THE CITY OF EDMONDS Date: y: j�4� Eveli, I f!e�t LABuilding New Folder 2010\Fo1-ms\Spccia1 inspection forrn.docl 0/21/2010 - 0 APeter Chopelas, PE Engineering & Design Services H7 N. Olympic Ave, Suite 208 Arlington, WA 98223 (360) 653-4615; Chopelasandassociates@gmai'l.com Geotechnical Report March 23, 2012 Revised: May 15, 2012 Eric Thuesen XXD �IY 1/11G 509-9'h Avenue N. Edmonds WA 98020 Ericthuesen@frontier.com 1-425-772-9401 Subject: geotechnical investigation for plan ck # 2011-0775 accessory structure (cabana) at the above address SUADIARY A geotechnical investigation of the above property was performed to address slope stability, erosion control and drainage issues. This sloping site has been extensively altered due to previous construction activities including extensive cut and fill of the slope. A small accessory structure (cabana) and a retaining Wall is proposed to be built below the residence at the top of slope below the home. The investigation consisted of a site inspection to examine soil s* and site conditions and to take measurements on the sites. A review of published material on local geology from the USDA Soil Survey of Snohomish County, and a review of the geotechnical. report done by Dennis Bruce PE, dated Jan 13th, 2005 for this site. The investigation found that the site can be made satisfactory with deep foundations for the proposed accessory building, and a retaining wall with footings deep enough to get below the fill, and the use of surface stabilization measures. The building site for the cabana is on shallow old fill placed at the top of the slope to make the �ack yard terrace largef. There is an existing site drainage system, including yard drains, and a conveyance system that transports all roof and driveway run-off to the base of the hill. The fill, though stable for landscaping features, is not suitable for permanent buildings. Therefore the proposed building and retaining wall should be built on foundations deep enough to bare on the original undisturbed subsoil. This will allow the proposed development with a generous safety factor of 1.5 or greater. These measures will reduce risk of landslides, increase slope stability and will not increase surface water discharge, sedimentation or erosion on downstream sites. This development will not increase surface water discharge, and it will not decrease slope stability but rather increase stability and it will not adversely impact-- - r4g W-ical areas. .Q.ft - Peter Chopelas PE WAS W h �_c �n r000" M 72, W MAY 2 9 2012 27274 BUILDING DEPARc.-MENT CITY OF EDMONDS AL -775; OLD 2-o) 2-' -�) Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal , sewer and a public water supply, and with an existing residence and garage built on a terrace on a sloping site. There is a proposed accessory building of 320 SF, with a 360 SF attached deck, a retaining wall and back fill to enlarge the useful backyard, placed at the top of a steep slope below the existing residence. The building site is about 160 feet from the toe of the slope, and about 50 feet in elevation above it. The foundation will be deep enough to reach below the old fill to bear on original undisturbed soil. These are Allowed Activities in a critical area per 23.80.090. B (1). 23.40.120 Mitigation sequencing. 1. The impact cannot be avoided since it is the property owner's desire to increase the safety factor of the slope and enlarge the useful yard area by adding an engineered retaining wall and building the cabana with an engineered foundation on the edge of a small level terrace. 2. The impacts are minimized by building a modest building and enlarging the useful area of the backyard by about 300 SF. Site disturbances on the slope should be kept to a minimum during construction, it should be done during the dry season, and all exposed soil will be covered during the construction phase. Both temporary and permanent soil stabilizing measures are recommended. 3. There are no impacts to wetland nor to any habitat area since none are disturbed. The site will be more stable and surface vegetation restored after the project is completed. 4. Both the foundation and retaining structure are engineered structures and will result in a safer, more stable slope condition than the existing site conditions. 5. The recommendations for the proposed project will result in long term slope stability. Recommendations include installing stabilizing engineered structures, protecting and maintaining the vegetation on the slope, and to minimize unnecessary site disturbances. 6. No compensation for impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas are required since none are disturbed. 7. Monitoring the hazard will be done during. the construction since the soil conditions have to be inspected prior to placing the footings, and during the construction to verify design conditions are met. Design adjustments may be made to minimize any hazards. Site Conditions The terrain slopes steeply to the west at about 32 percent average grade from a near level terrace on the east half where the existing residence is located. The terrace has existing lawn and landscaping and there is mix of grasses and landscaping shrubs and small to medium trees on the slope. There is no significant surface drainage on the site, and no seepage on the site. There is an existing drainage and conveyance system to transport surface discharge from the roof tops and driveway to the base of the slope to the west. The propdsed construction site is at about 50 percent grade, which was probably created by placement of fill on the slope from the spoils of the foundation excavations when the house was built since deep fill was found near the top of the slope. Local Geology The subject site lies along a. slope forming the edge of the highland plateau of the Edmonds area. The general stratigraphy (soil layering) of the area is characterized by fluvial and glacio-fluvial sediments from sea level to around 200 feet, with glacial till and sand deposit plains that make up the surficial sediments on most of the plateau. The USDA Soil Survey of Snohomish County maps the soil as Everett gravelly sandy loam and Alderwood gravelly sandy loam. The Everett soil is deep excessively drained soil on terraces and outwash plains. It is formed in glacial out wash. The sub -soil is dark brown gravelly sandy loam down to about 60 inches, with increasing gravel at the deeper depths. The Alderwood gravelly sandy loam is moderately well drained soil on till plans, moderately deep over a hardpan, and formed in glacial till. Both of these soils are very stable and suitable for building site development. This soil has good strength and is not prone to slumps or landslides. It is subject to surface erosion when exposed to the weather and measures are required to prevent erosion. This soil is not prone to liquefaction. The site shows no evidence of landslides or deep soil instability. There were some minor tension cracks in the soil near the top of the slope, but this was old fill that has been settling and causing surface irregularities. This does not pose a h azard to this site or the adjoining site, and the slope will be reinforced with the addition of the proposed structures. There is no flooding risk on this property. There are no wetlands or surface water on this property, however several hundred feet down slope there is a wetland at the toe of the slope. Geotechnics Surface soils have been inspected over most of the site and on the slopes by visual inspections. The underlying undisturbed soil on the subject site is deep silty sand, this is old alluvial outwash. The soil on the proposed building site below the existing home is undifferentiated fill I to 4 feet deep, likely the spoils from the house site excavations. It is a mix of sand and gavel and has organic material and other debris mixed into it. This was placed at the top of the slope, over steepening the upper 10 feet or so of the slope. Soil log I Soil log 2 Soil log 3 Soil log 4 0-12" mixed fill 0-36" mixed fill — 0-48"+ mixed fill 0- 18" fill 12"+ sandy loam 3 6"+ sandy-loa 18"+ sandy loam Soil log table Slope stability: Analysis of the natural grade of the steeper parts of the site using the Singh diagrams indicates that the slope shows a Factor of Safety of 1.8. This reduces to about 1.6 for dynamic seismic conditions. This indicates a stable slope with a large safety factor over the 1.5 and 1.2 minimum requirements respectively. The upper filled slope is also currently stable, but with a lower safety factor of about 1.2. This is acceptable for landscaping features, but deeper footings must be used to get into the underlying original 'subsoil. The soil properties of the undisturbed Everett soil is as follows: density (gamma)= 130 PCF; Cohesion (C)= 100 PSF, height of the slope is 50 feet. Erosion: All of the existing site is well protected from erosion with established vegetation All of the slopes over 30 percent on this site is subject to severe erosion if the soil is exposed. Minimize disturbing any vegetation on the slope. Any exposed soil on the site must have deep rooting ground cover installed as soon as practical, avoid concentrated surface flows on the slopes, and to transport by tight -line roof and driveway runoff to the base of the slope through the existing drainage system. 23A.060 and 23.80.070 Development standards. The recommendations in the following section will achieve the following: 1. It will not increase the threat of the geological hazard to adjacent properties beyond predevelopment conditions; and will reduce them since it will improve the safety factor. 2. It will not adversely impact other any other critical areas. 3. These recommendations are designed so that the hazard to the project is eliminated or mitigated to a level equal to or less than predevelopment conditions; and 4. All are certified as safe as designed, and under anticipated conditions, by a qualified engineer licensed in the state of Washington. Note that construction buffers for the proposed development is zero. The proposed changes will stabilize the slope to bring the safety factor well above the 1.5 minimum, so no buffers are required for this project. Therefore section 23.80.070 (1) does not apply. However, it is recommended to keep heavy construction equipment back from the top of the slope at least 10 feet during construction. I This proposed development is certified to: a. Reduce, and not increase surface water discharge or sedimentation to adjacent properties beyond predevelopment conditions; b. It will increase, and not decrease slope stability on adjacent properties; and c. These alterations will not adversely impact other critical areas; 3. Design Standards. Development within an erosion or landslide hazard area and/or buffer shall be designed to meet the following: a. The proposed development has a design safty factor of 1.5 or above static, and 1.2 and above dynamic, after the recommendations are accomplished. There is no reduction in the safety factor for the site, or to any adjacent properties. b. The Structures and improvements are placed to to avoid geologically hazardous areas and to improve the slope safety factors, and will have no affect on other critical areas; c. The proposed structures and improvements minimize alterations to the natural contour of the slope, and foundations are tiered where possible to conform to existing topography; d. Structures and improvements are located to preserve the most critical portion of the site and its natural landforms and vegetation; e. Th e proposed development do not result in greater ri�k or a need for increased buffers on neighboring properties; f, Retaining walls are used to allow the maintenance of existing natural slope rather than graded artificial slopes; g. The development minimizes impervious lot coverage, the proposed building is modest in size; 4. Vegetation Retention. All vegetation on the slopes shall be left undisturbed outside of the construction area; 5. Seasonal Restriction. Clearing shall be allowed only from May I st to October I st of each year; prov ided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions; 6. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from erosion or landslide hazard area are prohibited. All roof and surface discharge shall be collected and tight -lined to the existing site drainage system where it is conveyed to a an approved discharge point where there is no erosion hazard. 7. Prohibited Development. No On -site sewage disposal systems are proposed for the site. Recommendations The proposed building location can be used with a reasonable assurance of long term slope stability and safety to the building if the following recommendations are followed: I . Conventional footings may be used as long at it is placed a minimum of 12" into the original undisturbed sub -soil below the old fill. Bearing capacity is 2000 PSF. Equivalent fluid pressure of 35 PCF for retaining walls for drained on -site back fill. Coefficient of friction for the soil is 0.55 and passive soil (lateral bearing) pressure of 350 PCF. All bearing soil should be inspected by the engineer before concrete is poured. 2. The up hill footings of the accessory structure can be supported on two 24" square x 10" thick concrete footings, one near each comer of the building. These should be placed below the fill 12" into original undisturbed subsoil. The footings should be reinforced with (3) #4 rebars in each directions (3" clearance from soil). A 12" diameter Sonotiibe formed concrete column can be installed on top of these footings up to grade, this should be reinforced with (4) vertical #4 bars with a #3 horizontal hoops every 6". The excavated soil must be back filled and compacted over and around these footings up to grade. Roof run-off should be directed to a catch basin in the existing conveyance system and tight - lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope. 4. A silt fence should be placed on the downhill side of the construction site to attenuate silt - laden run-off if necessary. Silt fences should be placed around catch basin inlets. Soil that is' to be removed and reused around the site should be kept away from the top of the slope. Soils not to be reused. on the site should be hauled off site to an approved location. 5. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope should be protected with jute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soil needs to have topsoil spread and compacted and planted witl�vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows: Common Name Percent by Wei2ht Perennial ryegrass 40 Annual ryegrass 20 Red Fescue 40 This should be applied at a hydro -seed rate of 1 LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10-20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: Trees*( 3-4' size; plant 6' o.c.) ShrubsTo be 1-31 size; plant 2 foot Vine Maple Kinnick-kinnick Big leaf maple Salal Nobles fir Snowberry Grand fir Vinca Minor Oregon Grape Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. 0 0 cri 10 Cd 1� 0 L) 0 0 cli t1b 0 0 Cd 0 0 10 00 opoop ex :. — . alm AL ol 110 ol ol ol ZS ol 04 Of pa e lo� J, lo, i CO ;01 CL 0 A4 '-7 Poo- 00 to ell 001* doo fib bt I-ED, "OPA-, WTO Oft MCI D6 WO&L -17 -too 60a) -0)* - ?_lD i 0 q-to _ILD 9 N ZEEE8'LV N ol99T9*LV N OOOOR'Zi7 m Urs �7 %D ID PAV f!!t� RNA,, M t; K1.1 I-P�l -M, I wir� g��.23 �k. 'X­ N4lJ?V c '51V 0 65 0,4 .041, MY S F.IT 0 j� I �7.r IK ON: - A. q� _01 4 N M 12$111 NO; T1 jrV -T-1 - I—, r P9 21 Miliv MAM;", 14-1 No", ; M I & al j! x Mira Cp Viet 0 t Mcs �. �.Zj Pjil r TP V. M.Z 'MIKO!, aL'J�11.t:f LV N oUUUUEJ_Ll7 N oEECel- ey AM 1/0 I mwm QnL r2 IOW CC (QGIG fl) 27M IMN -MM RGINW -mawm I 2= wi lwv mno weim im -------- -------------- '" ------ 00, 0 GUM 11"Sy 100 I L 71 'w 3nohomish County Area, Washington TABLE 13—ENGINEERING INDEX PROPERTIES The symbol < means less than; > I mbans more than. Absence of an entry indicates that data were no t estimated] 117, Soil name and 1 iDepthll USDA texture �i Class!� !@ l�, 7 z:: g iments ercentage passiH map symbol Unified AASHTO 1 > 3 1 sieve number-- !Liquid Flas- i In i !inches! 4 1 10 40 200 1 limit ticity index T_ P _C-�� I'J 2, 3 ------- --1 ,:.Aiderwood 0-7 !Gravelly sandy IGM loam. !A-2, A-4,1 0-5 :55-70 150-65 135-55 120-40 1 20-30 1 NP-5 1 7-351Very gravelly jGM loam, very 1 A-1 !A-1, . i A-2 1 0-10 i 135-55 i :35-50 i :25-45 i 110-30 i i 20-30 1 NP-5 gravelly sandy loam. 35 !Cemented --------- ,'Alderwood ------- 1 0-7 !Gravelly sandy !A-2,. A-4,: 0-5 155-70 150-65 135-55 120-40 1 20-30 NP-5 1 loam. 1 A-1 7-35iVery gravelly jGM 1 !A-1, A-2 1 0-10 :35-55 135-50 125-45 L10-30 1 20-30 1 NP-5 loam, very gravelly sandy loam. 1 35 :Cemented --------- Everett --------- *, 6:*: Alderwood-- 1 o-6 Gravelly sandy ism :A-1, A-2 i 1 loam. i 1 6-18:Very gravelly jGP-GM, GM jA-1 : sandy loam. i i 18-60:Very gravelly :GP jA-1 coarse sand, i i very gravelly loamy sand, extremely gravelly sand. 0-7 iGravelly sandy jGM !A-2, A-4p! 1 loam. 1 A-1 7-351Very gravelly jGM :A-1, A-2 1 loam, very 1 gravelly sandy 1 loam. 35 !Cemented --------- 1, 1 0-10 165-85 150-75 '130-50 115-30 5-10 130-60 120-50 i10-30 5-25 5-20 125-50 :15-45 1 5-20 1 0-5 0-5 155-70 1150-�65 135-55 :20-40 0-10 135-55 ,35-50 i25-45 1:10-30 15-25 1 NP-5' 15-25 1 NP-5 NP 20-30 NP-5 20-30 1:-NP-5 Jrban lanL ----------- lellingham 1 0-9 !Silty clay 'loam. 1 ML, OL 1 9-601sil'ty clay, clay, 1 CL CH 1 A-4 1A-7 0 1 100 1 100 195-100180-95 . 1 25 -40 , silty clay loam.1 0 1 100 195-100195-100185-1001 45-65 ---------------- ;ellingham 1 0-6 !Mucky silty clay 1ML, CL 1 - 1 loam. !A-6, A-7 1 0 1 100 1 100 :85-100180-1001 35-45 Variant 1 6-421Silty clay loam, 1. silty clay. ICL .:A-7 0 100 1. 100 185-100:80-lbol 40-50 :*42-60!Stratified loamy 1CL-ML, fine CL,!A-2, A-4�i 0 100 1 100 :40-80 120-60 1 20-35 .1 sand to 1 SM-SC, SCI A-6 1 silty clay loam.1 10, 11 -------- 1 0-8 !Loam ------------- jML athcart 1 8-35!Loam, sandy loam,!ML, SM :A-4, !A-4, A-5 1 -0 A-5 190-95 185-95 :70-80 :'60-70 1 145-65 35-45 silt loam. 1 0 180-95 180-90 170-85 35-45 135-60!Loam, clay loam IML, SM '1-4 i 0 180-90 175-85 165 75 140760 1 30-40 .yohemists -------------- ister _: 0-9 Fine sandy loam Ism !A-2, I 9-351:Loamy fine sand, 1SP-SM, SM !A-2, A-4 1 0 A-3 f 0-20 1 100 190-1-00180-90 136-45 25-30 i 1 sand. i i . 195-100190-100170-80 1 5-20 1 i35-60!Fine sand, sand, jSP-SM jA-3 0-20':95-100160-80 i i i : 160-70 1 5-10 1 --- I 1 gravelly coarse sand. See footnote at end of table. NP-10 20-40 10-20 20-25 5-15 5-10 5-10 5-10 NP-5 NP NP Peter Cho.pelas, PE Engineering & Design Services 307 N. Olympic Ave, Suite 208 Arlington', WA 98223 C IA. ya (360) 653-4615- Chopelasandassociates@'gmail.com AN Miti2ation Plan May 17, 2012 per section 23.40.130 �27974 Eric Thuesen 509-9'hAvenue N. 7AL ivl_ Edmonds WA 98020 Ericthuesen@frontier.com Subject: Slope stabilization measures for plan ck 2011-0775 accessory structure (cabana) at the above address Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal sewer and a public water supply, and with an existing residence and garage built on a terrace on a sloping site. There is a proposed accessory building of 320 SF, with a 360 SF attached deck, a retaining wall and back fill to enlarge the useful backyard� placed at the top of a steep slope below the existing residence. The building site is about 160 feet from the toe of the slope, and about'50 feet in elevation above it. Goals and Objectives The project will reduce potential, landslides, stabilize the existing slope, enhance erosion control on the steep slopes,. and will enhance and add to native vegetation on the hillside. 1. Potential impacts are uncontrolled run-off, erosion and destabilizing the slope d construction phase. There is new impervious area proposed and the additional loads on the slopes created by the proposed structures. These will be mitigated by using an engineered design, construction timing, limiting disturbing the slope to.between May 1 . and October I st, use of a silt fence on the down hill side of the site disturbance, cover any exposed soils on the slops within 48 hours. Permanent measures will be to direct roof run-off to the existing stormwater conveyance system, and replanting disturbed soil with native vegetation suitable for soil stabilizing surface soils. There are no wetlands, habitat, or shorelines affected by this project, so no habitat mitigation measures are necessary. However, replanting of the hillside with native vegetation will enhance the natural environment and provide for improved habitat. 2. Slope stability measurements were done using traditional Singh diagrams. This has been in use for many decades and has proven to result in safe and stable slopes. This methodology results is a more stable slopes as indicated by more modem analysis methods. R E U MAY 2 9 2012 BUILDING DEPAR NENT C!-,Yl CP EDW" NOS 3. If all recommendations are followed, the likelihood of success are estimated to me 98 percent or greater. The methods proposed have long histories of successful outcomes. 4. Only steep slope areas are affected by this proposal, all mitigation is oriented towards steep, slope development. All off site impacts will be prevented by following the recommendations in the Geotech report. B. Performance Standards. Regular inspections of the site must be made to insure that off site run-off avoided by containing all surface riun-off on -site during construction. And that those construction recommendations are followed. C. Detailed Construction Plans: These are detailed in the Recommendations I section of the Geotech report. These include: 1. Conventional grading and footings recommendations. And all bearing soil should be . inspected by the engineer before concrete is poured. 2. Roof Tun -off should be directed to a catch basin in the existing conveyance system and tight -lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope. 3. A silt fence should be placed on the downhill side of the construction site to attenuate silt -laden run-off if necessary. Silt fences should be placed around catch basin inlets. Soil that is to be removed and reused around the site should be kept away from the top of the slope. Soilsnot to be reused on the site should be hauled off site to an approved location. Clearing shall be allowed only from May 1 st to October 1 st, of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis depending on actual weather conditions. 4. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope should be protected with jute matte or straw and replanted with native vegetation. After fmal grading any disturbed or exposed soil needs to have topsoil spread and compacted and planted with vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows: Common Name Percent by Weight Perennial ryegrass 40 Annual ryegrass 20 Red Fescue 40 This should be applied at a hydro -seed rate of 1 LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer, shall be 10- 20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: 0 . 6 trees*( 3-4' size; plant 6' o.c.) Shrubs*(to be 1-31 size; plant 2 foot O.C.) Vine Maple Kinnick-kinnick Big leaf maple Salal Nobles fir Snowberry Grand fir Vinca'M or Oregon Grape Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. .D. Monitoring Program. Inspections should be done during the construction at each phase, and upon completion of the replanting of the exposed soil. Itshould not be necessary to monitor the health of the vegetation for more than one year after completion. If the plants are growing, healthy, and providing ground cover, no further action should be necessary. E. Contingency Plan. Project modifications may have to be done if unforeseen soil conditions occur during the soil and excavation inspections, or if unusually wet weather or soil conditions are encountered. F. Financial Guarantees. Applicant will post bonds, or a pledge of financial responsibility (at the director's option) to ensure mitigation, maintenance, and monitoring. [Ord. 3 5 27 § 2, 2004]. The size of this project is not sufficient to require extensive bonds. 4"�ection 24 T27NIO05E WM J Scale 111:201 1* Prope t _V Owner/Site Address: Eric Thuesen 11%. N' 509-9'h Avenue N. N, Edrnonds WA 98020 Q Ericthuesen@frontier.corn 1-425-772-9401 Prepared by: Peter Chopelas PE 'T 307 N. OlYmpic Ave, suite 208- North A r] -%'17A no 5 � _11� /_ /_ J (360) 653-4615 Ch6pelasandassociates@gmail.com . 4D 96 QVM Legal Description: SEC. 24 TWP 27 RGE 03 S 11 OFT OF �1/2 SEI/4 SEIA Nw 1/4 EXC E 190FT THOF LESS W 50FT FOR CITY ST PER AFN 1756635 AKA PAR B OF CITY OF EDM BLA REC AFN 200416195002 Tax Account Number 27032400220600 Site Plan Site Plan Notes I Seasonal Restriction. Clearing shall be allowed only from may I st to October I st of each year; provided, that the director may extend or shorten the dry season on a case -by -case basis de -pendinjz on actual weather con'ditions. 2. A silt fenc& should be placed on the d ; ownhi 11 side of the construction site to attenuate silt-la.den run-off if necessary. Silt fences should'be placed around catch basin inlets. Soil that is to be removed and reused around the site should be kept away from the top of the slope. Soils not to be reused on the site should be hauled off site to an approved location. I I Roof run-off should be directed to a catch basin in the existing conveyance Sys . tem and tight -lined to the base of the slol�e. No drains or concentrated flows should discharge over the ground or on the slope. 4. All vegetation on the slopes shall be le! ft I undisturbed outside of th e con'struction area. The vegetation on the steep slopes should be replaked as soon as practical after construction. Any disturbed Soil in the area of the slope should be protected with jute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soil needs to have topsoil spread and compkted and planted with vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows: Corn non Name Percent by Wei2ht Perennial ryegrass 40 Annual ryegra§s 20 Red Fescue 40 This should be applied at a hydro -seed rate of 1 LB per 1000 sq. ft. (or 60 LB. or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10- 20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for -permanent plantings on disturbe . d slopes and buffers: Trees*( 34' size; plant 6' o.c- I Shrubs*(to be 1-3' size; plant 2 foot E�E _L 0 T O.C. Vine a le Kinnick-kinnick V [Big leaf maple Salal N L s f oble Ir Sno" s fir Snowberry Grand fir Vi—c-a M i n o r Red current Other native species as recommended by qualified laj�dscape professional knowledgeable in saim-i stabilization may also be used. RESUB.,V MAY 2 9 2012 R; BIWLI)ING DEPA WENT CITY OF EDIVIOGS KA 72 74 M r'n -A M OV. EDAI, 0 lkst. I PERMIT # bld20110775 0—ITY OF fEDMONDS — ENGIARING' DIVISION SPECIAL INSPECTION AND TESTING AGREEMENT 4 %it 6A ip Yx ;Wc 11�XSG& PROJECT SITE ADDRESS: 509 — 9" Ave N PROJECT NAME: Thuesen — Cabana and Retaining Wall SPECIAL INSPECTION AGENCY DATE: June 6, 2012 *One form must be completed by each Special Inspection Agency or Inspector. SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project, as applicable, in accordance with Title 18 Edmonds Community Development Code (ECDC). When required, the project must be installed/constructed* per approved plans and specifications. The owner or the registered design prof6ssional in charge shall employ an independent testing/inspection agency/special inspector to perform required special inspections. The special inspector shall be a qualified person with competence'for inspecting the specific type of construction or operation requiring special inspection. The owner, registered professional, contractor and special inspector/agency shall provide a special inspection report detailing compliance with approved plans and specifications directly to the Engineering Division. WORK REQURING SPECIAL INSPECTION: Special inspections will be required for the following categories of work: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL INSPECTIONS SEE THE STATEMENT OF. SPECIAL INSPECTION NOTED AS A CONDITION ON THE BUILDING PERMIT AND/OR ON THE APPROVED PLANS. F1 Soil Conditions Prior to Placing Footings and During Construction STREET FILE F� Retaining Wall Drainage BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall complete this agreement and return to a Permit Coordinator prior to permit issuance. APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Engineering Division prior to performing any duties or inspections. The credentials of the specific person performing the inspection shall be submitted. When applicable, the company performing inspections must be accredited by the American, Association of State Highway and Transportation Officials (AASHTO) RI 8. A. Duties and Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications. Special inspections are to be performed as needed, to confirm that the work being completed meets specifications and approved plans. CADocuments and Settings\mcconnell\Local Settingffemporary Intemet Files\Content.Outlook\52G2LQK3\bld2011O775- SpeciallnspectionAgreement-ENG,(2).doc Revised 06.06.2012 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and engineer of record. The special inspector shall provide a report to the Engineering Division notifying of any iterdg notTe461vedarydJoT, ho�Ms-tAltFd p�r th6. apq@��d-,�I�hs pdspq Lns d 11' Items not constructed per the'apprhedp -an jkcific'dfio s Will Aitjin a review of the plans to determine what requirements will be needed for the project to meet the necessary stormwater requirements; such as removal and reconstruction, re -design of the stormwater management system(s), etc. Final approval for the project will not occur until installation of all required improvements is complete and accepted by the Special Inspector and the City. 3. FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. The report shall also include a statement from the inspector stating to the best of his/her knowledge the project is in conformance with the approved plans, specifications, and approved plan revisions, if any. Items not in conformance, unresolved items orany discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED. SPECIAL INSPECTIONS . It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed under the statement, of special inspection on the building permit and. as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the, special inspector access to approved plans ai the j obsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be pt�ovided to the City Engineering inspector upon request and upon completion of work. C. City of Edmonds Enineerin2 Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Engineering Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS CADocurnents and Settings\mcconnell\Local SettingsUernporary Internet Files\Content.Outlook\52G2LQK3\bld2011O775- SpecialInspectianAgreement-ENG (2).doc Revised 06.06.2012 Work requiring specialopection and performance of special ioctors shall be monitored by the Engineering Division Inspector. Engineering Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. FINAL APPROVAL The Engineering Division may provide final inspection approval after the special inspection report(s) have been submitted and accepted by the City. D..Owner Responsibilities 1. The project owner or the en , gineer or architect of record acting as the owner's agent sl�all iund special inspection services. E. 'Engineer or Architect of Record Resposibilifies 1. Prepare Statement of Special Inspections. 2. Review the special inspection reports and provide corrective actionfor work that may not conform to the approved plans. Owner name ACKNOWLEDGEMENTS I have read and agree to comply with the terms and conditions of this agreement (please print or type) Signature Date General Contractor Company/Owner name (please print or type) Signature Special Inspector/Agency name (please print or type) . Date Signature Date Engineer of Record name (please print or type) Signature Date Return the original signed agreement to: City of Edmonds Development Services Department 1215 th Avenue North, City Hall Second Floor Edmonds, WA 98020 ACCEPTED BY CITY OF EDMONDS ENGINEERING DIVISION: City Official Signature . Date Title: I CADocuments and Settings\mcconneMLocal Settings\Temporary Internet Files\Content.Outlook\52G2LQK3\bld2011O775-, SpecialInspectionAgreernent-ENG (2).doc Revised 06.06.2012 Mike Clugston Planning Dept. City of Edmonds RECEIVIED MAY 2 9 202 MaaOMW SMVIMS RE: PLAN REVIEW ANSWERS TO COMMENTS APRIL 6,2022 FOR PLAN CHECK #2022-0775 ACCESSORY STRUCTURE (CABANA & RETANING WALL) AT 509 e AVE. N. Dear Mike, I have provided a revised geotech report, site plan, mitigation plan and structural design for a tie back retaining wall for the project. I have also provided the comment answers, revised height elevation and revised site plan (cabana computed height elevations to the following April 6 comments: 1. STRUCTURAL LOT COVERAGE FOR ALL STRUCUTRES ON THE PARCEL. Tota I Lot Area Strucutres Area Residence Detached Garage Proposed Cabana Total Structure Area 19,786 square feet 2t847.57 418 359 3,624.56 square feet, Total percentage of Structural Coverage Lot Coverage 18% 2. REVISED ELEVATION DRAWING New Height Calculations , A) 148 riih� Z.- MAY 2 9 2012 BUkDING DEPAR-'MENT CITY OF EDMONDS B) 148 C) 144 D) 146 STREET FILE Total 586 / 4 = 146.5 + ( Max allowable) 15= 161.S Max Roof Ht 8,�D2-o/Z-C;7757� 3. Retaining wall was changed from original proposed after geotech site inspection and test pits -findings (Geotech Report Chopelas.& Associates).: Existing shallow fills on site required a caba ' na stepped foundation and retaining wall designed to make slope suitable for permanent buildings and reduce landslide and increase slope stability. All detail references have been made outlined in ECDC23.40.120.B and ECDC 23.40. ECDC 23.80 Sincerely, C, �3 Eric B. Thuesen I 6 1 1 �) �1 0 :. Drainage Report FOR Thuesen Custom Homes (*S-05-09) at 503 _ 9th Avenue N. Edmonds, WA 98020 City File # S-05-09 November, 2006 Revised - December, 2006 Revised June, 2007 Revised July, 2007 Prepared for: Thuesen Custom Homes 17296 Talbot Road Edmonds, WA 98026 Prepared By: Jerry O'Connell, P.E. M -- - — Q E "GIN EERS ISURVELY0118Z �� M M - Lovell-Sauerland &Associates, Inc. 19400 33rd Avenue W. Suite 200 Lynnwood, Washington 98036 LSA FILE No: 4288 Section 1: Project Information Project Name: 98"� Avenue N Short Plat Project Site Address: 503 9"� AvenueN. Edmonds, WA 98020 City File Number: S-05-09 Project Engineer: Lovell-Sauerland &Associates, Inc. 19400 33"d Avenue W.' Suite 200 Lynnwood, Washington 98036 Phone: (425) 775-1951 Project Applicant: Thuesen Custom Homes 17296 Talbot Road Edmonds, WA 98026 Phone: (425) 670-2825 Project Total Area: 1. 03 Acres Number of Lots: 2 - singlefamily Soils Data: Alderwood 'C' per Sheet #56 of SCS Soil Survey of Snohomish County July Revision Executive Summary This revision incorporates 4th City review comments as follows: 1. change the reference to the regional detention facility to the shell creek diversion pipeline. PALSA Engineering Docs\4200 thru 4299\4288\drainage\4288-jo-rpt2.doc 0, ) SECTION 10 Appendix P:TSA Engineering Docs\4200 thru 4299\4288\drainage\4288-jo-rpt2.doc