Loading...
518 MAIN ST.PDF11952 518 MAIN ST ADDRESS: 15-h4, ll;YI-YIAI S7- TAX ACCOUNT[PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): A? 57-0 7W COVENANTS (RECORDED) FOR: CRITICAL AREAS: DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: DETERMINATION: E] Conditionat Waiver n Study Required n Waiver -7k(h- SEWER LID FEE $: LID SHORT PLAT FILE: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT WATER METER TAP CARD DATED: LOT: BLOCK: L\TEMP\DSrs\Fonns\Street File Checklist.doc IN 010041fl-0 #A CITY OF EDMONDS, WASHINGTON BUILDING PERMIT nt:hereby cehifies that a p)ot, plan, drawings, and sufficient details to indicate This Spa�e Is For, in6ifition461f1Jl1ill'a:re'qur ements of this code are attached hereto. Ciq Ifispktor Oniv, made- for permit to do' the following work: A . ........ ................................................. r .......... .................................. . ......... -- ----------------------------- ... ............. 7 ..................................... ................. . ...... . .... . .... . ...... . .. . . .... . ......... .... ..... . ................ . ................ . .............. . .. ......................................................................... . .. . ..... . . ...... . .............. ................ Block ..... �2 ..................................................... ..... ................ . ........ . ...... . ...... . .... . .... . ......... 7 ---------- — ------------------ .. ...................... .................... ................ .... ......................... . . ..... .... .......... ...................... . ...................... . . .... . ... ns ............. .. ........... o ....... X .... t, . dimensions ....... 3-r2 ................ X� ...... ......... -tNifldi will be ................. ....... stories. ent ---210 -01 T .......................... ..................... _y ofl - uflding.--will be ...................... feet fi-om the nearest adjoining line. .7 ......... .......... 8-0�rner's Addrms..1-44.. e. .......... 4--.- --V, .9. Builder.. -4 .... ..... .... . ..... .... ......... L. ............................ . .... . ............... 10. . BuilaeFs Address ... ------ - ---- ... ................................... .......................... . ............. --------------------- ------ ........ ...... ........... ............. Date... . . .... . ..... ....... 19 -,57 A . ................... I .............................................................. f ..... (Owner or his agent) 'bed hereon, according to the approved plans and sp&-ifications pertairiirlg h Permission is hereby granted to do the work descri ereto subject to compliance with the ordinances of the City of Edmonds. PERMIT N9 728 00 .......................... i�� by (Issuing Officer): Department. of Buildings. City.of Edmonds, i. , ne building permit fee which applicant pays when permit is issued shall be based on estimated cost of the proposed structure, at the rate of,$2.00 for c-ach $I000.00 of cost. 1! the actual cost of the structure, when fin3lly determined, exceeds the estimated cost by more thin 5%, applicant agrees to pay sc� 2ddhiatial fee of $2.00 for each $1000.00 of such excess cost. 2. * Whenever a contract for construction Is executed for any amcrure costing more thin $1000.00 for which 2 licensed architect Of Cngift-er' Is not required by the Building Code of the City oi Edmonds. . the appliC2tiOn for a building permit shall be accompanied by a copy of the contract suict a copy of the detailed specificat ions. . . . : : 3. Prior to employing any labor or commencing work, notify the Industrial Insurance Division of the Department of Labor aud Industries, giving in eWmate.of the payroll and make monthly reports of payrolls. Full instructions should be obtained (rom the neareft office of the Department of Labo� and Industries. Belom final payment, the owner should obtain a release from the general contractors w�,o in turn should obtain release from all sub -contractors. 7%e releases -should be qft— it of Labor and Industries. Ile above procedures are requirements of the State Industrial Insurance Act. Estim ated cost $12.0 11 .1 LEGEND: 2—hour rated Wall assembly. JLFE Fire extinguisher locations. A Required exit to the exterior of the building. FERM Electrical Meter FG 0 Gas Meter / Gas Shutoff 101 1/01 TEMP—A—RORY'S 518 Main Street Edmonds, WA Occupancies: A2 Type of Construction: Type VB 1 Level on Grade Total Building Area: 2,690 S.F. 2003 IBC, IMC, IFGC, IFC, UPC, WSEC, VIAQ Fire apparatus access: Paved North street and South alley. ACTIVE FIRE PROTECTION Fire alarm system w/ smoke detection Fire alarm control panel location. Illuminated exit signs. Emergency lighting w/ battery back—up. HVAC automatic shutdown. Fire extinguishers. Fire alarm enunciator PASSIVE FIRE PROTECTION Smoke control system ,��D STRUCTURAL PROTECTION: It, Exterior load bearing Walls = X—hour Interior load bearing walls = NR Exterior non —bearing walls = NR Structural frome = NR Permanent partitions = NR Roof — Ceiling = NR Exterior openings = NR Roof material class = EXISTING fML, 6?A^V-- AAS*;--97-) 13 IN RESUB DEC 78 2005 BUILDING DEPARTMENT CrTY OF EDMONDS D' L____1 L -1 1:1 El 17 —11 _j L _J L 0 0 _J L _J L FLOOR PLAN FIRE PROTECTION FOOTPRINT STREET FILE NTS '___�p ml WO�P E E_ RED 4 NEA41SF- lS6LPc-Tl0tQ LOC-A-110 BACKFL; 1)40'T APPF.OVEb PE�An� V-6" uj z _j ui a- 0 of a- w w I!__ LLJ z -SITE PLAN BY ENGNEERINQ 5rC:) 0 (41 NTS a: _411 . ZONING REQUIREMENTS Date: qk;3l'&_l2__,____ajNERAL PROJECT INFO EDMONDS MUNICIPAL CODE PROJECT ADDRESS: 518 MAIN STREET STREET FILE ZONING DISTRICT: ALLOWED / PROVIDED BC (COMMUNITY BUSINESS) EDMONDS, WA. 98020 SITE AREA: PROJECT DESCRIPTION: 3,300 SF REMODEL EXISTING TENANT SPACE TO BAR RESUB LOT COVERAGE: FEB 0 7 2006 SPACE WITH LIMITED FOOD SERVED. BC LOT COVERAGE ALLOWED: 100% 3,300 SF 3,031 SF TAX PARCEL NUMBERS: JAN 2 7 2006 dUILDING DEPARTMENT 0043-421 -200-0600 BUILDING BUILDING SETBACKS: (MIN.) 09-0" 111 OF EDMONDS LEGAL DESCRIPTION: DEPARTMENT STREET: FRONT) - 01-0" X xxxx CITY OF EDMONDS STREET: �SIDE) X SIDE: 01-oss X REAR: ot-O" X PROVIDE PREMISE ISOLATION ON MAIN WATER SERVICE Fr - BUILDING HT.: REDUCED PRESSURE BACKFLOW PREVENTION ASSEMBLY BC MAXIMUM HEIGHT TO BE 25'-0" ABOVE IMMEDIATELY ON THE CUSTOMER SIDE OF THE WATER 5 METER, AND PRIOR TO ANY OTHER CONNECTIONS. AVERAGE DATUM EXISTING BUILDING 13'-4" ABOVE A CONTRACTOR TO VERIFY METER LOCATION. ASSUMED GRADE OF 0.0 1 - 1 is-999 w z 0 m 1 9 —6" SITE PLAN NTS: :t ZONING REQUIREMENTS , MUNICIPAL CODE "I&MONDS ZONING DISTRICT: ALLOWED PROVIDED BC (COMMUNITY BUSINESS) SITE AREA: 3,300 SF LOT COVERAGE: BC LOT COVERAGE ALLOWED: 100% 3,300 SF 3,031 SF BUILDING SETBACKS: (MIN.) STREET: FRONT) 0'-0: X STREET: �SIDE) 0'-0 X SIDE: 0'-0- X REAR: 0'-0 X BUILDING HT.: BC MAXIMUM HEIGHT TO BE 25'-0" ABOVE AVERAGE DATUM EXISTING BUILDING 13'-4" ABOVE ASSUMED GRADE OF 0.0 iio'-o" 981-311 PROPERTY LINE PROPERTY LINE 1081-15's imp-"v (2cpY- E -- -- c*n f-,*n c*n '��o 11*10 t�lo -ff--m -rf---m -rf--,n GENERAL PROJECT INFO uj z o RESUB OCT 04 BUILDING DEPARTMENT f--rrV OF EDMONDS PROJECT ADDRESS: 518 MAIN STREET EDMONDS, WA. 98020 PROJECT DESCRIPTION: REMODEL EXISTING TENANT SPACE TO BAR SPACE WITH LIMITED FOOD SERVED. TAX PARCEL NUMBERS: 0043-421-200-0600 APPROVED By PLANNING LEGAL DESCRIPTION: ( xxxx 2�6-1t' - STREET FILL Ld Ld 0 z APPLICATION for The City of Edmonds SIDE SEWER PERAHT NEW CONSTRUCTION REPAIRS 0 EASEMENT No . .......................................... n6n goo OWNER.... %7.f �-- � . ...... (!&t ............................. CONTRACTOR .................. ............................................................................... PERAUT No . ...................... ,ADDRESS.5l.g ..... 1�1-t ...................................................... LEGA.L DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ NAMEOF ADDITION .... .................................................................................................................................... 0 7,,) Approver DATE....................................... ........ By ...................................................................... Ima t OE 0 4, '0 CITY OF EDMOOS 121 5h Avenue North Edmonds, WA 98020 Phone: 425.771.0220 Fax: 425.771.0221 - Web: www.ci.edmonds.wa.us DEVELOPMENT SERVICEs DEPARTMENT: PLANNING DivisioN ADmiNiSTRATivE DESIGN REvrEw -STAFFDEasioN- BLD20100357 through BLD20100361 Project Proposal Edmonds Mural Society has submitted applications for five murals to be placed at various locations throughout the downtown area. The murals are sponsored by the Edmonds Mural Society and this years theme for the murals are "A Moment In Time." Property Owner/Applicant Roy Fredericksen PO Box 488 Edmonds, WA 98020 Camwest Inc. 6212 196" St SW Lynnwood, WA 98087 R. Payne 8837 29" NW Seattle, WA 98117 McDevitt Investments LLC 330 Dayton st #2 Edmonds, WA 98020 Brian & Erin Comstock 411 Main Street Edmonds, WA 98020 Artist/Contractor Andy Eccleshall 22310 95"' PL W Edmonds, WA 98020 Jeff Stilwell 519 N 103 St Seattle, WA 98133 rn Jeff Stilwell M- 519 N 103 St Seattle, WA 98133 Cherly Waale 17245 10' Ave NW rn Shoreline, WA 98177 Greg Hartman 22413 6th Place West Mountlake Terrace, WA 98043 Design Review Process Design review for signs is considered a Type I decision subject to the requirements of ECDC 20.01.003 as well as ECDC 20.60 (Sign Code). Analysis: I . Location. Four of the mural sites (BLD20100358 through BLD201-00361) are located within the BD - I and are therefore subject to the requirements of ECDC 22.43 - Design Standards for the BD-1 Zone. The remaining mural is located in the BD-2 zone and subject to the general design requirements of ECDC 20.11. The location of the five murals, mural name, and zone are detailed in the Table I below: e 01 ti %-rREv--" FILE Page I of3 0 0 Table 1: Mural information. Permit Number Location Mural Name Zone Mural Size BLD20100357 214 Main St Edmonds Mills 1883 BD-2 8' x 20' BLD20100358 100 50'Ave N An . Evening in Edmonds BD-1 9' x 16' BLD20100359 I I I 5h Ave S Sun/Rise, Moon/Rise BD-1 14' x 9' BLD20100360 518 Main St Edmonds Sunset BD-1 10'x 16' BLD20100361 411 Main St Evolving Edmonds BD-1 12'x 16' 2. The Comprehensive Plan identifies all the sites as Downtown/Waterfront Activity Center — Retail Core. The murals satisfies the intent of ECDC 22.43, specifically treating blank walls, as well as the following goals and policies from the Comprehensive Plan: a. Downtown Design Objectives are found on pages 38-42 and are intended to encourage high quality, well designed projects to be developed in the downtown waterfront area that reflect the values of the citizens of Edmonds. b. "Improve pedestrian access and way -finding by providing a variety in buildingforms, color, materials and individuality of buildings" (page 39). c. "Art should be integrated into the design of both public andprivate.developments, with incentives provided to encourage these elements" (page 40). d. "Public art and amenities such as mini parks, flower baskets, streetfurniture, etc., should be provided as a normal part of the public streetscape. Whenever possible, these elements should be continued in the portion of the private streetscape that adjoins the public streetscape" (page 40). 3. Sign type. The murals are considered wall graphics and wall graphics are conditionally permitted sign types in the downtown business area. Two of the murals (BLD20100358 and BLD20100359) will be applied. via a vinyl film which is pressured applied to the wall surface and then permanently set with heat -activated industrial adhesive. It is understood that this type of application is meant to resist degradation and can be easily maintained. The other three signs will be painted on using acrylic paints. As described above, the murals satisfy the design requirements and objectives in both ECDC 22.43 and in the Comprehensive Plan. 4. Size. According to ECDC 20.60.050, there are no area restrictions on wall graphics. The proposed mural sizes are identified in Table I above. 5. Maintenance: The Mural Society will maintain the signs. The painted on signs will belreated with a LTV -protective sealant to minimize fading or weather damage. The murals will be inspected each spring for damage and any damage discovered will be immediately repaired. Decision: Based on the facts and conclusions of this report, staff finds that the design review for BLD20100357 through BLD201003 61 is APPROVFD. d th plication for compliance with the Edmonds Community Development Code. K&-�en Lien, Plai�i� Division Date Page 2 of 3 Appeals: Design review decisions by staff are. only appealable to the extent that the applicable building permit or development approval is an appealable decision under the provisions of the ECDC. Design review by staff is not in itself an appealable decision. Page 3 of 3 Jj �j IT -Ilk IT OLT, To X `4�� DO 1Y _,mn 4r4 j lilt jjw.� �, ., �,,? R i IT OLT, To X `4�� DO 1Y _,mn 4r4 j lilt jjw.� �, ., �,,? R i Description and Summary for Proposed Mural Edmonds Sunset by Cheryl Waale (518 Main St) When I learned the theme of the 2010 Mural project it only took a second for me to decide What I would do --a colorful sunset looking across Puget Sound, with the Olympics in the background. This view is very familiar to me as I look at it every day while working in my studio. And, to me it fits perfectly with the theme —A Moment in Time. My goal is to incorporate the tree-scapes I'm recognized for in the Edmonds community —using signature brush -strokes and color, but taking a slightly more traditional approach with the composition. Each of my samples are meant to draw the viewer into the painting through the path to the edge of an Edmonds bluff unfettered by typical landmarks. The final painting would be completed in a size approximately 10 x 16 or in proportion to the chosen wall, and would better show signature brushstrokes and incorporate architectural details. Color combinations are easily adjusted. RECEIVED MAY 2 7 2010 DL-VELOPMENT SERVICES CTR- CITY OF EDMONDS Maintenance Requirements for Proposed Mural Edmonds Sunsd by Cheryl Waale (518 Main St) This mural shall be painted on a building wall that has been leased by written contract for a length of ten years, with an option to renew. The Edmonds Mural Society, by contract with the landowner, is responsible for all maintenance and upkeep for this mural during the -time specified by the contract. The Edmonds Mural Society shall maintain this mural in the following manner: This mural shall be mounted in keeping with the fmest methods of mural creation to date. In specific, the wall shall be pressure -washed at least one week in advance of the mural raising. Second, before mounting the mural, a layer of primer shall be applied to the wall surface area. Finally, fbllowing completion of the mural, it shall be treated with a UV - protective sealant to minimize fading or weather damage over the years. The two main sources of damage to a mural are sunlight and dampness. Each spring, this mural shall be examined thoroughly by technical consultants retained by the Board of the Edmonds Mural Society for signs. of fading due to ultra -violet rays or dampness or weather damage. Any such damage will be immediately repaired in consultation with the technical consultant and artists hired by the Board of the Edmonds Mural Society. On a final note, the Edmonds Mural Society is often asked about protecting murals from vandalism, specifically "tagging." Surprisingly, the wealth of experience of mural societies across the country all agree: tagging of murals is not a serious concern. It almost never occurs. Then, too, on those rare occasions that tagging does occur, mural societies have uniformly found that cost of repairs is relatively cheap. (Quite simply, they paint over the tagging.) Moreover, all the mural societies that we asked agreed that while there are anti -tagging products available on the market, they are so expensive that their purchase is not justified when repairs to the rare mural tagged are so inexpensively', and quickly, carried out. RF_cEIVED mAy 2 7 2010 I)EvELOPMENT SERVICES GTR. CITY OF EDMONDS Schedule for Development, Fabrication and Completion for Proposed Mural Edmonds Sunset by Cheryl Waale (518 Main St) Development: This mural design was submitted to the Edmonds Mural Society in January 2010 in the competition to select five murals to be mounted. At that time, by the time the artist submitted the design, its development was complete. Fabrication: This mural is being painted on the east wall of A Very Taki Tiki Bar & Grill. Therefore, there is little fabrication occurring. Instead, the wall will be pressure -washed the week of June 27 - July 3. A coat of primer will be applied early in the week of July 31 - August 6. The mural itself, weather permitting, shall be painted either the weekend of August 7-8 or August 14-15. If the weather is not appropriate for the painting of the mural either of these two weekends, the Edmonds Mural Society will make arrangements for the painting of the mural on a following weekend. Completion: During the week following the painting of the mural, it shall be coated with a UV - protective sealant to minimize fading, dampness, or weather damage over the years. RECEIVED MAY 2 7 2010 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS 0 4) Artist's Resume for Proposed Mural Edmonds Sunset by Cheryl Waale (518 Main St) ARTIST'S STATEMENT: I'm mostly a self-taught artist who finds painting to be a perfect means of creative expression. My tree-scape compositions are done with acrylic and are mostly intuitive. Challenging myself to push the envelope, I use unconventional combinations of color, loose bruslistrokes and thick texture, with the goal of a stylized landscape that exudes mood. Recently, I've been working in oils with mentor Liana Bennett who is teaching me to plan, study, and paint with intention. Each medium fills a unique, creative need. When I feel experimental, I go for the acrylics. When I feel more studious, *1 bring out the oils. I'm inspired by the impressionists and use a similar process of mixing paint on canvas. Vivid color, geometric shapes and loads of texture are signatures of my work. Trees, birds, and spiritual symbols are themes that inspire me. My work has a designed look which is often partly abstract, partly defined. The ultimate goal is mood —I keep working the painting until it simply feels right. There is no greater pleasure for me than to have a finished piece touch people on an emotional level. EDUCATION: Antioch University Seattle, M.A., 1995 San Jose State University, CA, B.S., 1980 PUBLIC ART: Artworks Banners — "Four Seasons" Edmonds, 2010 SELECTED EXHIBITIONS: Shoreline City Hall, Shoreline, 2009-10 Local Color, Seattle Public Market, 2010 Local Color, Seattle Public Market, 2009 Edmonds Arts Festival, Edmonds, 2009 HouseWares, Edmonds, 2009 ARTSplash, Edmonds, 2009 Parklane Gallery, Kirkland, 2009 University House, Issaquah, 2009 Edmonds Art Studio Tour, Edmonds 2009 Edmonds Arts Festival, Edmonds, 2008 HouseWares, Edmonds, 2008 ARTSplash, Edmonds, 2008 Parklane Gallery, Kirkland, 2008 February Featured Artist, C'est la Vie, Edmonds, 2008 Edmonds Art Studio Tour, Edmonds 2008 On Wing, Edmonds Conference Center, Edmonds, 2008 Art of Our Mothers, Edmonds, 2008 RECE:IVED MAY 2 7 2041kr,' D CITY F-r S"VICES CTR EVELOPMEN EDMONDS is 0 Evidence of Assumption of Liability by Designee of Proposed Mural Edmonds Sunset by Cheryl Waale (518 Main St) NAME: _(,& .ZR / ADDRESS: -7,R 0�rS -- CITY: 11�~-Q U-4-t� ZIP: PHONE: EMERGENCY CONTACT: EMERGENCY PHONE: I hereby release and absolve Edmonds Mural Society and any and all of their agents, directors, board, agents, staff, personnel and/or volunteers from any liability for any accident or injury that might occur from my participation in any activity sponsored by the Edmonds Mural Society or any practice thereof. I further agree to release and hold harmless Edmonds Mural Society and any and all of their agents, directors, board, agents, staff, personnel and/or volunteers and agree to indemnify each of them from any and all claims, costs, suits, actions, judgment, and expenses, arising from my participation in any activity sponsored by the Edmonds Mural Society or any practice thereof. Signed (signed by parent or legal guardian if under the age of 18) Date RE:CEIVED MAY 2 7 nmo U I DEVELOPMENT SERVICES CTI3. CITY OF EDMONDS 0 Materials Quality and * Durability for Proposed Mural Edmonds Sunset by Cheryl Waale (518 Main St) This mural shall be painted using Nova acrylic paint and products, widely regarded as the first choice of muralists across the country. Nova Color Artists Acrylic Paints has been made in Culverton, CA since the 1960s. Nova employs a tough, durable, 100% acrylic resin suitable for use outdoors. No additives are needed for exterior use. (By way of contrast: House paints or craft paints are often made with a less expensive and less durable latex or vinyl latex resin, designed to last 5-10 years before recoating.) The American Society for Testing and Materials (ASTM) standard D5098 rates the lightfastness of pigments (ie resistance to fading). Lightfakness I is the highest rating, and the majority of colors to be used in painting of this mural are rated 1. In addition, the. clear topcoat Nova Color #216 Exterior Varnish or Nova Color #'206 Gloss Medium & Varnish designed for exterior use by Nova will be applied to the completed mural to protect against dampness, fading due to UV rays or weather damage. Nova Color Artists Acrylic Paints conform with federal art material labeling guidelines and have been reviewed by a toxicologist. All colors except the cadmium colors (rarely used in murals) are labeled as follows: No health hazard labeling required. Labeling conforms with ASTM D-4236. Chicago Public Arts Group recommends Nova paint in the painting of exterior murals, saying: "Many murals in Chicago have life spans of thirty years and more. With ongoing restoration and publication efforts, these works of art will speak to local, national, and international communities for decades to come." Users of Nova Color Acrylic Paints: .Philadelphia Mural Arts Program Chicago Public Arts Group Kent Twitchell, (nationally known) Muralist John Pugh, Trompe L'oeil Illusion Artist Art Mortimer, (nationally known) Muralist George Yepes, (nationally known) Muralist RECEIVED �IV 2 7 2010 DEVELOPMENT SERVICES CTR. CITY OF EDMONDS 0 0 r', CITY OF ED-M--0NDS---` WORK 0WNER__nj�__7W__je-e t3h��-AEi APPROVED;,7M 0 BLDG. OFFJCJ� PER271T NUMB;;,i�-- V�t-0 2Z An 0 L4J c�- (/) 0% om 6 ow z5c 1 REmo FILE REcEIVED MAY 2 7 2010 DEVELopM OF SERVICES CTR. ENT CITY EDMO14DS 0 CITY OF EDMONDS BUILDING DEPARTM�NT 'WORK 111,41Y, RECOVED ,ADDRESS j�"dz 12Z OWNER AUG 0 3 BUILDING DEPARTMENT OR' DDR WNI PR X 0(p APPROVED DATE CITY OF EDMONDS B X `2 ZLDG. OFFICIAL a, PEFIMIYNUMBER 29'-9'1 00 HVAC UNIT, MID BLDG PARAPET 0 PROVIDE NEW I CANVAS FOR AWNING T1 CN EXISTING STOREFRONT PAINT AND REPAIR TO MATCH EXISTING COLOR PAINT EXISTING 204 WOOD AND GLASS I DOORS TO MATCH EXISTING COLOR C�l AS! APPROVEA� ERG ."E-ERING 0.c c '4' r C C,4 81-61 8 IT REPAIR AND PAIN4T V-611 Dee: STOREFRONT TO MATCH ,"'3�EXTERIOR NORTH ELEVATIO"xiSTLQ EXISTING COLOR �o 3we I/Ar 6L - APPROVED BY PLANNING PROPEk�Y LINE STREET FILE' 0 0 Any request for modification, variance or other administrative deviation (hereinafter "vaniance") must be specifically called out and identified. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state, law does not approve any items not to code sp -T7() Ora SOV, ogps of PLANNING DATA SIGNS SITE ADDRESS: 5-127 /,1 &.\., S i, ZONING: 16C DATE: �( , � li, 1-g-& PLAN CHK#: 2-001,,o 23 1 NAME OF BUILDING PERMIT APPLICANT: A VL4, 76v-; PROJECT DESCRIPTION: WA41 AD13 FILE #: OR DATE WAIVED: A—%% lqrjyra��A - ell6ldb PLANS MATCH APPROVED PLAN: TOTAL AREA PER TYPE OF SIGN: TOTAL Sign area Allowed Matrix Area allowed Type of in Conditions Allowed Per for this Sign Zone? Met? Unit Unit sign Example Wall, wl Yes, wl Yes 1 sq. ft./ lin. 41, foot 41 square Intemal cond. ft. of attached feet Ilium. attached wall wall SIGN I Y, /VI/14 29, 75- 2-9,75" SIGN 2 SIGN 3 TOTAL SIGN AREA FOR SITE I TENANT: Maximum Allowed: Z-9- IS Previous Total: 0 Proposed Total: Z's 1* P"F" S b 2.50 1Ahbrary\p1anning\fbrms & handouts\staff reports\Aplandat—SIGN.doc 0 0 SIGN HEIGHT: Sign Type: VV,.f,41 Maximum Allowed:. Ae,��Zkctual Height: 4 1 -11 1,4 Sign Type: Maximum Allowed: Actual Height: Sign Type: Maximum Allowed: Actual Height: SIGN LIGHTING: N---c f"11 Sign Type: - Lighting Proposed: Allowed in this Zone: Sign Type: Lighting Proposed: Allowed in this Zone: Sign Type: Lighting Proposed: Allowed in this Zone: SIGN COLORS: Proposed: W011A &"-- - PI-1�11P.-1146(y-z" I e26,J Acceptable? y4f Requires7ADB Approval? M5 SIGN LOCATION: Proposed: rn",tAA U� Lt 0A Gwrd";--,�Col If Freestanding and 3 feet or over (unless on a fence) m"6ets setbacks? 9/1 Required Setbacks: Front: o Left Side: 0 Right Side: 0 Rear: 0 Actual Setbacks: Front: Left Side: -Right Side: Rear: LANDSCAPING FOR FREESTANDING SIGNS: Size: Location: /�A CRITICAL AREAS # (Freestanding Signs Only): AM Waiver / Meets CA requirements REDUCED SITE PLAN (8.5X11) PROVIDED FOR STREET FILE? At. OTHER: Plan Review By: 1Ahbrary\p1anning\fon-ns & handouts\staff rcports\Ap1andat—S1GN.doc