Loading...
520 3RD AVE N.PDFIIIIIIIIIIII 4894 520 3RD AVE N PLANNING DATA SINGLE FAMILY RESIDENTIAL Name:- - Date: t Z -2*— Site Address: Tax Parcel: project Description: Plan Check #: s 0 1 Reduced Site Plan ProvidedZ!��5/ NO) I-oning: 12, Map Page: corner Lot: (YES I<n Flag Lot: (YES Critical Areas Determination #: e-KA 2-0,156!) 1-02- El 'Study Required.'' Waiver SEPA Determination: Exempt" El Needed (forover 500 cubic yards of grading) 0 Fee 0 Checklist 0 APO List with notarized form Re wiredf 5-'Ietbacks Street: 2 Side:. /1J - Side: Rear: S (E- ActualSetbacks Street: Side: -2-S- Side: Rear: El Detached Structures: E-1 Rockeries: El Fences/Trellises: El Bay Windows/Project . ing Modulation: El Stairs/Deck: 'Id,' Height 1117 Daturn Point: Z4 Datum Elevation: Maximum"Height Allowed: I Actual Height: Other Parking Required: Parking Provided: Lot. Area: 101 -7 e>s Maximum Lot Coverage: 35% Proposed: Lot Coverage Calculations: ADU Created: (YES Subdivision: Legal Nonconforming Land Use Determination Issued: (YES CO-)) 'Comments Plan Review By: Plannlhg Data Form 07-14-09 APPUCATION 1 f4 The City of Edmonds SWE SEWER PER8W NEW 0ONSTRUMON I C] REPAMS 0 EASPACrJfr No . ........................... .............. 113-0655Q Robert T. Kelley OWWER.............................................................................................................. COMMACTOR ............................................................................................ ----- PERIM No . ................... ADDRm3s ... 520 3rd Ave. N. .................................................................. I ............... LEGAL DESCRUTION: LOT No . ............ NAME OF AMMON .. "OrREET FILE 01 .................... BLOCK No. Dye Tested On Sewer 1972 Approved: DATE............ ................... ............... 13Y .... ................. CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 FAk (206) 771-0221 COMMUNITY SERVICES DEPARTMENT Public orks e Plannino 9 Parks and Recreation 9 Ennineenno 890 November 2, 1993 Washington Style Painting 520 - 3rd St. Mukilteo, WA 98275 Gentlemen, LAURA M. HALL MAYOR Mailed,11/2/93 I am writing to confirm the results of our meeting on November 2, 1992. 1 appreciated your responsive reply to my October 29, 1993 letter and willingness to meet with us. The October 29, 1993 letter was a warning based on what we thought was strong evidence that your company had made an illegal discharge of a contaminate into the City's storm drainage system. The letter was written after attempting to contact you by telephone. Following our meeting, I am convinced your company did not make this discharge. I will notify the Department of Ecology of this finding. Again, I appreciate your cooperation in this matter. Sincerely, DON FEENE, P.E. Hydraulics Engineer DF/sf c: Bob Wright, Department of Ecology AlbE�rt�r WAPAIN72.DOC Incorporated August 11, 1890 0 Sister Cities International. — Hekinan, Japan CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-0220 FAX (206) 771-0221 'qlkj � COMMUNITY SERVICES DEPARTMENT --ammo— Q$ Public Works Planning Parks and Recreation Engineering 9 0 Mailed 10/29/93 October 29, 1993 - C Washington Style Painting 520 - 3rd St. Mukilte6, WA 98275 kh 11111 011 1 - - Gentlemen, LAURA M. HALL I MAYOR A water quality discharge problem involving your, company was brought to my attention on this date. Milky white wker was spotted in the storm drain system downstream and -was traced to its origination at a residence (17015 - 76th Ave. W., Edmonds) that'was being painted by -your company. The discharge of untreated wastes to waters of the state constitutes a violation of RCW 90.48.080 (see attached copy) of the Washington State Pollution Control Law and is subject to enforcement actions, which includes penalties up to $10,000 per day. A copy of this letter is being mailed to the Washington State Department of Ecology. If you wish more information, please feel free to- contact me at 771-0220, or Bob Wright (649-7060) at the Department of Ecology. Sincerely, DON FEENE, P.E. Hydraulics Engineer DF/sf c: Bob Wright Department of Ecology Q Albery * Incorporated August 11, 1890 0 Sister Cities International — Hekinan, - �Japan I An el C�-- r 041 Mod AM4 44 7 f WAW4 4! Y XF w, tj ? BUTTERFIELD DESIGN GROUP ED 400 DAYrON EDMONDS. WAN= FAX 42s.776-6748 425-776-OW H0661 N5 I EMAIL ButtwfisJdDesigr4ATT61-COM W2 - JoIlLk 4 BUTTERFItILD PARTNERSH'p- 1NC- 510 4th AVr. 50JTH c4R5 4 - 6MER LINE e, -6 LOCATION TELE. POLE RELOCA7W TELEPHONE 5'510EKALK—w PETAIL "A" 1�j SCAL.Ei 1/4" = 1'--0" j 4th AVE. S. r* t r APPROVED BY ENGINEERIN13 :20'-0' 20'-Om A Date: Z-- --: FAR71 AL 5 1 7E FL A 56ALE: I"=20'-O" BUTTERFIELD DESIGN GROUP PRO-EC.Tt DATE: 0:2-12-02 400 DAYTON EDMONDS, WA 98020 MR. 4 MRS) PALE 425-775-0564 FAX: 425-77"746 EMAIL: Buttaftid DesignQATTIBLOOM H0676INS BUTTERFIELD PARTNERSHIP, INC. 1 510 4th AVE. SOUTH - EDMONI;05, KA. qbo2o 2/2:8 T220TI192t7:Oi :WC�IA H22:62 2002-Si-q�IA t X, p STMeT APPROVED AS NOTED' BY EN ,*ERING 'r Date: ---2.a t 0 2- -Fo a !91-q —sollt Sims or- ii��S IPL NZAIWST -TojKr 57*LL.0Y%J%N6i fbV- NO 619VMOZ -rffMJ 10 Su> PF, 4-sl tmolscc ftpe mec-A W cw -rO %;�� MIN& 099AY, VgRj t_ AAZ c Sef,, b-T4 %Avcfflzo -foiz- t>pzivow" VxTk� N-I� ltqcopl�clop- 11-0 62(lj9,:o)eK Pfl-Is alo-ST fts J �`;4�7, A�, A7 <gy RV &,AAM" 'Qi w �4t 4, "k-ru, A-, �,4, 71 (I "ON i� 'T j", T o I� INA 01 14� �Y2 �p k; I I I i l- IN , - , NN INK - 'All ly This X� 7, rg" 'N 6 J- zA "Nii .1 Jo -r 4,,�k,VT N, K. Ii� A 3F rllr V tV c, -04 7;( ONPO -PA7�i , � " .. i, V 17, ok P� 4 .449,'� AN ,.,# Ao, V—o Permit No: City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date:l/s�2/ r__ -H A. Address or Vicinity of Construction: .7 .4T B. Type of Work (be specific): U--kl W -TIE5, V-IAKNJ (Q4 S, cr-,w4u� M��f C. Contractor: Contact:— A/V-S% -7 -7 Tce, Mailing Address: Y0� E��fj Phone: Liability Insurance Bond:$ State License #:to" D. Building Permit # (if applicable): - Side Sewer Permit# (if applicable): E. F-1 Commercial E] Subdivision 0 City Project [J EUC (PUD, GTE, PSE, CHAMBERS, OVWD) Multi -Family Singl . eFamily�tj* n Other INSPECTOR-P'6n*JMGkL1_ r-1 NO G. SIZE OF CUT /1 5; &Y F. PAVEMENT: YES X 0' H. Charge: $ CONCRETE CUT: gy� ES NO IDEMNITY. Applicant understands by hislher signature to this application helshe holds -the City OEdm6nds harmlessftom injuries, damages or claims of any kind or description whatso . ever, Jbreseen or unforeseen, that may be made'against the City of Edmonds or any of its departments or employees, including . but'not limited to the defense of any legal proceedings,including defense�,c ; osts and attorneyfees by reason, ofgranting this permit. THE CONTRACT?4 IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BYCITYFORCES, AT WHICHTIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCETO THEAPPLICANT. * Traffic control and -public safety shall be in accordance with City regulations as required by the City Engineer. Every :�,Pagger must be trained as required by (WAC) 296-155-305 and must have certification verifying com . pletion of ihi required training in their possession. * Restoration is to, -be in . accordance with City codes. All street -cut trench work shall be patched,with asphalt or City - approved material prior to the -end of the workday - NO EXCEPTIONS. * Three sets of construction drawings of proposed work are required with the permit application. I HAVE READ THEe4 WE AO, VE SIA THATIMUS MAUPITHEIPIP AND UNDERSTAND. THE PERMIT REQUIREMENTS AND ACKNOWLEDGE F THE PERMIT A VAILABLE ON SITE AT ALL TIMES FOR INSPECTIONS Agent) 7i 410 5r- cm CALL DIAC-,k-DIG (1-800-424-5555) PRIOR TO BEGINNING WORK FOR CITY USE,ONL.Y A proved by: Ao�o ..p Right-of-way Fee: 1. me Aptborized: Void After KMO,; Oi%tm t Disruption Fee/Fund I 11: M*a-li Conditions: 10� 15h*;!" haLdewev Restoration Fee: 4- Total Fee: .1c 7 - Receipt NoT Issued by: UPON COMPLETION OF.PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS r COMMUNITY DEVELOPMENT CODE FINAL APPROVAL OF PERMITTED WORK, I INSPECTOR'SS 1VA�UA'JkTE:-,1 For inspection requirements see Engineering Information Handout. I NO WORK SI-IAIA, BEGIN PRIOR TO PERMIT ISSUANCE "T City of Edmon Permit N ds o: 12U RIGHT -OP -WAY CONSTRUCTION PERMIT Issue Date:'eKP A. Address or Vicinity of Construction: Ono Avemkie- tAvnonAs- B. Tylpe of Work (be spc�cific)` 017^ rem creft, ee ybuv -ri'm 64� or, W c- L, V tea C41 J 4�. re M I 15 et to 07 w4lkwa-1 kJ C. Contractor: Contact: A rv, ,e Mailing Address: Pfio�e- 7-PIK q: 7 �, W00-11ovill�,/vA elbbl" A f1i (.11 ed L r, W ­'S6ate License CC- 310 VIF7 Liability Insurance: Bond: $ Pi OCO'. 00 - J. Side' ewer Permit # (if-Eip Micabl�)` '1-14 10-1, D. '�gdilding P� W# (if ippli�abl�): [A S P E C ommerciat El. Subdivision. City Project EUC (PUD, VERIZON, PSE, AT& T, OVWD),. R Multi -Family Single Family.' El Other INSPECTOR: F. PAVEMENT CUT: YES NO G. SIZE OF CUT x CONCRETE CUT: YES El NO, AlI'LICAN'r m MIAD AND SIGN INDEMNITY. Applicant understands by his/her signature to this appikation helshe holds the bty of Edmonds harmlessfirom "'injuries, damages or claims of any kind or description whatsoever, foreseen.9� unforeseen, that may bemade against the City.of 2��mon or, any of its departments or employees, including but not limited to the "defense of any legal I proceedings inc . luding defense -i,,:�.costs a�d �iitqrneyfees by reason ofgranting this.permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE.VEAR FOLL097NG THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL'THE FINAL STREET PATCH is COMPLETEDBY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT HILL BE PROCESSED FOR ISSUANCE, TO THEAPPLICANT, he 60jngineer. .,Ever control and pkiblic."fety shall be in accordance with, City,�.regulations,as required by_ Traffic -y- r uir'ed' by (WA 6- -305 anil *nius't have certific'atio�n verifying completion of the 9 41agger, must be trame as, eq required training in their possession. Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior to the end of the workday - NO EXCEPTIONS. Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNINGWORK I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND A CKNO WLEDGE THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR- INSPECTIONS Signature: Date: b&/26.,Al2r �Contractor or Agent) (�3_ / . FORICITY USE ON Approved by:. Time "Authorized: Void After �2u/ 02- Special Conditions: f-gleg, rofJOrtioNs or- Ly Right-of-way Fee: Disruption Fee/Fund, 1-11: Restoration Fee: Total Fee: 1,004.5 4 Receipt'*Noi Issued by: VU)m 5L0eWA-U(_, 15,iftmL�L CLOSUPt., 1,-&kA6 . if F -TO 15e, _VLAC�eo, VVI-02- -TO UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING F1 L M INSPECTION 18 REQUIRED PER C14APTER 18.00 OF THE EDM , DS COMMUNITY DEVELOPMENT CODE (Phone 425-771-0220 E .1326) A117) I FINAL APPROVAL ITTED WORK., 2.11 OF PERM ...DATE: linsi ecto�j' Signat &reor(, 41 2 In 1 4 For inSDection'reauire e'ntt�siile,,eqi'i�LSiiiiie�erin4nSD NJ ormatiolka 11 ut L"'Pt, DAMy Documents\Forms\Engmmg\ROWpermit—.doc 7 FROJECoT 1:)ATA 10/14/2015 �51TI=_ ADDRE55: 520 THIRD A\/E. NORTH EVMOND5 YNIA q5O2O OY�NER NAME: ROBERT AND DEBRA FUR5ER, CURRENT ADDRESS: 14cil 5 - 102nd AVE NE BOTHELL YAA 115011 TELEPHONE: 425-531-OCI.23 A55E55OR'5 PARCEL No. 2-7o524002oroobo ZONINO: R5-ro COUNTY: SNOHOMISH JUR15DICTION: CITY OF EDMONDS CONSTRUCTION TYPE: V - a OCCUPANCY: R5 / U (OARA&EICARFORT) PROJECT DESCRIPTION: CONVERT PORTION OF &ARA6E TO HEATED SPAC E, REPLACE KITCHEN, REPLACE BATH �NITH'7)NO BATHROOMS, ADD ROOF OVER FRONT PORCH, MISC. KNDOkN AND 0009 REPLACEMENTS AND CHAN&ES. = A. PRO-JF_C,T AKE�- SO FT HIEEIGHT LIMIT (::�ALCIJLATION LIVIN& SPACE NEY4 EXISTIN& TOTAL REF. DATUM LOCATION: Y4ATER METER LID FIRST FL 66 1010 10'76 AT NN CORNER OF PROPERTY BY 5IDEY4ALK SECOND FL REF. 1��ATUM EASE ELEVATION 100.00 BASEMENT AVERA&E ORAVE (SEE OALr, BELON) 103.1q LIV. 5P. TOTAL 66 1010' 10"76 MAXIMUM HEI&HT LIMIT IN FT 25.00 6ARAC7E :260 260 MAXIMUM HE16HT ELEVATION .125.1q EX15TIN6 HI &-HEST ELEVATION 115.25 COV-PORCH- �.25� 21-:2 :240- - -105 N�N- EL = 10:2.,,-NE­-F_ — 103.5i-6E EL = 3 5N EL = 103.25 TOTAL = 41:2.75 / 4 = 103.1q .MleG. TOTAL 25 47.2 E500 NO CHAN615 TO F-XISTIN& HEI&HT Applicant &,ill repair/replace all damage to utilities orkonZM�,10 improvements in City right-of-way pp-i Oty standards that is caueed or occuiz, during t1he.permitted project. __J OWNER/CONTRACT, U, �6 MYONSIBLE FOR EROSION CONTROL AND DPAINAGE LOT COVERAC7E ea FT IRC,'ANP KBEC, 2012 LOT AREA 10"75a HEAT SYSTEM: EX. GAS FORCED AIR MAX PERCENT COVERA&E CLIMATE ZONE MARINE AREA 4' MAX COVERA(SE AREA 3,-M& VERTICAL (5L. 030 MAX 6L 0/6 N/A PROPOSED COVERA615- 1,676 OVERHEAD &L 0.50 HEADER R-10 FROF05ED FERCENTA6E 15.54% CEILIN67 R-4q VAULT R-55 LOT CALC, NE�N EXISTINO TOTAL kNALL (INT) R-21 BELON 6R. R-.21 HOUSE 1016, 10-76 FLOOR R-30 _tZZ ED6E R-10 OARA&E 260 260 CHAPTER 6 (5LAZIN(5 CALCULATION HEATED FLOOR AREA N/A COV PORCH 25 21.2 240 FROF`05EI�) 6LAZED AREA N/A SHED 100 100 UNLIMITEC) ALLONEI:) / PROPOSED: N/A IMFERVICU!5 SURFACoE 50 FT IMPERV.AREA PRE 1-175 P05T 1-116 TOTAL MAX P05T -7,5 COVERAOE AREA 2,000 PROPOSED COVERA6E AREA 10 JARE EAVES AE3OVE EARTH INCLUDED? YgEj HOU5E/6ARA&E 1356 1556 PORCH/EAVE5 240 10 250 PATIO/YqALK5 159 13q DRIVE�AJAY 500 500 IOUT BUI DINO 100 100 LEGAL DESCRIPTION:— SEC 24 TWP 27 RGE 03RT-16) BEG S MGN CO RD WITH E LN 3RD ST TH SLY ALG SID E LN 890 FT M/L TO TP13 TH CONT ALG E LN 80 FT TH'E 274 FT MIL TO W LN 6TH ST TH N ALG SD W LN 70 FT M/L TH W 235 FT M/L TO TPB LESS E 100 FT r� I:zA� 614 —,A.'7-1 a w w z z 0 z 0 z W w X Z Z U) CJ 50 C� w 0� C� < :r! < I LL 0 CJD L 1w NORTH (S( Vrii 0 1'7�-�-77 1 —0 95 1-1-7-16, w V APPROVED BY PLANNING I/u 1f5- Zone-- z, Corner —Flag_ 'T Setbacks iit12—ulred Actual R"ET FILE Front Sides RECEIVED Rear A 00 Other OCT 15 2015 Be DEVELOPMENT SERVICES COUNTER U- M ui 0 Ca z.�c U, K 0) §2 z a a- LLI Ju z U) C3 lu 0 3: 0:: LcLL, = 0 Ld z 0 tu lu �2 C-) OL T 13 0 in c) uJ 0 w 0 z < OL z IL z to I �i lu Ul z Z ul ILI lu < U4 X z z lu 13 < < Ir->. 14,15� REVISIONS