Loading...
520 4TH AVE S.PDFlill 11111111 5080 520 4TH AVE S APPLICATION for The City of Edmon,ds SlID19 SEWER PMMT EASEMENT No . .......................................... NEW CONSTRUCTION El REPAIRS 0 l0e) - CONTRACTOR-_.. ..... ............................................ .......................... ......... PERMIT No . ........... OWNER ---- .......... ....................... .............. . ..................................... ........... LEGAL DESCRIPTION: LOT No . .............................................. ADDRESS ..SaO ... 7 ......... AVC BLOCK No . ...................... ..................... NAMEOF ADDITION ................................................................................................................ ....................... U. LU LU ct) /q 7cl Diva, Tas4ed on SaWar Approved: DATE....................................... ........ By .......................................... ........................... City of Edmonds Permit No: . I RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: A A. Address or Vicinity, of Construction: lu S ixl�: lal-0 B. Type of Work (be specific): A 2-� PW�Slgxr_ VIMII mi_�yw (W 'e, JA.Iaq 01%1­2c!)�� 3, S 10, U C/',� �uw L xv Slum, ,�Atl 0A AIM C. Contractor: ri� (4 LSLiZD 11�&� 122 75th S-.2 a;] Mailing Address: I — State License D. Building Permit # (if applicable): 4 Contact: f,'OUG USfTAL0 Phone: (425) 356-7520 Liability Insurance: Bond: $ Side Sewer Permit # (if applicable):'. E. Commercial E]' Subdivision City, Project-f]-- EUC (PUD, GTE, PSE, CHAMBERS, OVWD) Multi -Family Single Family n,�Qther, INSPECTOR F. PAVEMENT: M YES F1 NO G. SIZE OF CUT 4 x 2 H.Charge: $ CONCRETE CUT: N YES NO, APPLICANTTO READ AND SIGN IDEMNITY. Applicant understands by hislher I signature to this application helshe holds the City ofEdmonds harmlessfrom injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any.legal proceedings including defense costs. and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERMLS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT, * Traffic control and public safety shall be in accordance with City regulations as required by the, City Engineer. Ev ery flagger must be trained as required by (WAC) 296-155-305 and must, have certification verifying completion of the required training in their possession. * Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City - approved material prior, to the end of the workday — NO EXCEPTIONS. 4 Three sets of construction drawings of proposed work are required with the permit application. I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND A CKNO WLEDGE THATIMUSTMAKE THE PINK COPY OF THE PERMITAVAILABLE ON., ' I A Ti ALL TIMES FOR INSPECTIONS Signature: (Contractor or Agent) CALL DIAL -A -DIG (1-800-4214-5555) PRIOR TO BEGINNING WORK. FOR CITY USE ONLY 00 Approved by<�PU, no I �_ Right-of-way Fee: :J6 Time Authorize : Void After /00 Disruption Fee/Fund 111: Special Conditions: Restoration Fee: M 91W Total Fee: cGaA& Receipt N ' 6' Issued by: UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMO COMMUNITY DEVELOPMENT CODE. FINAL APPROVAL OF PERMITTED WORK, INSPEE )!TOR'S SIGNATURE DATE: 61.4) For inspection requirements see'Engineering Information Handout.. NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE ------ 7 ----------------------- NOTES -------------------------------- 1. CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 N 11'�501 VALVE 11'W'19's C� CY) - (L' 1"V] 60' co 'd.. C4 W HOWELL ST. 7' EX. 2" PE LO LO IP 16�S C\2 91 -485 EX. 2" PE IP 16' S '970�9033 �0' VA VE \f7'W, IL6Y'SI a. C4 > co co 2" PE IP MAIN 18' W I TIE-IN 0 209'S,18'W rL L 6 0' END MAIN 250'S, 18'W rL 2. CITY OF EDMONDS: Maintain a minimum of Whorizontal and 3'vertical clearance from all city utilities and appurtenances. Cuts in paving are shown as 0 e cuts in paving anticipated. Notify Engineering Division 24 hrs prior to construction - 425-771-0220 3. PROJECT MANAGER: DOUG USITALO - 425-356-7520 GAS MAIN INSTALLATIONRETIREMENT IR SIZE LENGTH TYPE MANUFACTURER 1 211 40' MPE 1 11, 4 " MPE PRELIMINARY ONLY CALL 1-800-424-5555 Not for Const-rucqqp s,,-,c, 2 BUSINESS DAYS BEFORE YOU DIG NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILITIES 5 REAL ESTATE/EASEMENT PERMIT EDMONDS 4 3 FUNCTION NAME PHONE NO DATE 2 PROJECT MGR: D. USITALO (425) 356 -7520 12/ 21V 99 1 ENGINEER: / / REV# DATE BY DESCRIPTION DRAWN BY: C.S. 12/21/99 COUNTY EMER SEC Work Center CHECKED BY: / / APPROVED BY: (425) 356 -7520 12/21/ 99 1/4 SEC NE- 26- 27- 03 OP MAP 164.62 PLAT MAP 164.65 U-MAP# (POWER) CIR MAP# CIRCUIT# IMAPPING: JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# PUGET SOUND ENERGY 2" PE IP MAIN EXTENSION TO SERVE: 520 4 AVE. S. EDMONDS, WA. INCIDENT# DRAWING# 107008284 SAP SUPERIOR ORDER# 107006284 SCALE: 1" 50'