Loading...
527 MAPLE ST.PDFiiiiiiiiiiiiii 12129 527 MAPLE ST ADDRESS: 7 TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS:. 9!1 �?— /0 — DETERMINATION: E] Conditional Waiver F] Study Required Xwaiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARk-ThH1 A(-.PPPX4PMT-, DATPr)- EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: 0 /1�7 14r---,e9 j j z z J, SCALED PLOT PLAN DATED: SEWER LID FEE LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) GEOTECH REPORT DATI STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: LATEMP\DS'Ps\Forms\Street File Checklist.doc #P20 bkFileNo:. Critical Areas Checklist Site Information (soils/ topography/ hydrology/vegetation) 1.. Site Address/ Location: 52:1 t:1'&1PL_5_ 2. Property Tax Account. Number: s 10 -5 le�o 3. Approximate Site Size (acres or square feet)- 0. 1-5. 4. Is. this site currently developed? yes; — no. If yes, how is site developed?.- t,4 �4 At4M r'-,F_7r St> j:�4 A 5. Describe the general site topography. Check an that apply. Flat: less than 5-feet elevationchange over entire site. Rolling. slopes on site generally less than 15% (a vertical rise of .10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over. a horizontal dist-inceof 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ;Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway floodplain of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? QJA Flows are seasonal? — (What time of year? Y 10.. Site is primarily: forested meadow shrubs mixed urban landscaped Qawn, shrubs etc) 11. Obvious wetlan*d is present on site: For City Staff Use Only 1. Plan Check Number, if applicable? 11A I Site is Zoned? R- M 3. SCS mapped soil type(s)? q C—_w-r-e,7V' !��Low"e_ 6 lealn (i 5- % 9 4. Critical Areas inventory or CA dicates Critical Area, on site? ro ckp� 0 n cy e- s4-, kj�-- 4evcd. i5 -rty . 1 .1 - . . 5. Site within desibated earth subsidence landslide hazard area? DETERMINATION --STUDY REQUIRED Reviewed by-_'M_6� 116 WAIVER . . '0C. 1%9" #P20 City. of Edmohds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.0221 The Critical Areas Checklist contained on this forni is to be filled out by -any person preparing a Development Perinit Application,for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to det&mine whether any potential Critical Areas are, or may be, present on the subject property. The information needed - to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, 'or soil surveys). Date Received: 0-�5 / 01 -7— City Receipt #:_ a6 04'4' Critical Areas File #: C��A-- wD4. - 0 Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant: A property owner, or hislher authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this forni to assist City staff in finding and locating the specific piece of property described on this form.. In addition, the applicant, shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their prelimi�iary assessment of the site. The undersigned a * pplicant, and his/her/its heirs,.and assigns, 'in consideration on the processing of the application agrees to release, indemnify, defend and hold the City . of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon :false, misleading, inaccurate or incomplete information fumished by the applicant, histher/its agents or employees. By my signature, I cer* that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. SIGNATURE oFAPPLicANT/AGENT J.. DATE Property Owner's Authorizatiou By my signature, I certify that I have authori zed the above Applicant/Agent to apply for the subject land use application, and grant my permission forthe public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection and ting attendpn�to this application. SIGN . ATURE Of OWNER.777F;= DATE PLEASE PRINT CLEARLY Owner/AppHcanti- I J, tAl C- elAt Name �- 0 � Z)x Street Address ELf,—L1,A city State Zip Applicant Representative: 1415 J% M C) I-A%JA -T Name -Z 19 1 TP A,%-j F— Street Address 71�DK &*Js> & 10 -Z (P City State Zip Telephone: 2-t�)A 41( zn-�7--f Telephone: 4zc-- -a, C) Email address (optional): to a�,gZ)�n=q -Email Address (optional):: ivkpc-1pj,&@ 'D PLANNING DATA SVWtRie, E Multi -Family * Commercial Name: vivice, borcich Review Date: 0 0 0 Site Address: 15Z-7 M*Ple, C.71-retd- Permit Number: BLD.2008. 0 A+ Project Description: t4itw 3 - Lk V1 i f ('0V1 a tolclq (t'<. Sf-p. -T 5 P- Zoning: FLM —1.95 Comp Plan: MF "hfe3h 4ensity"+ wcA+c'f 0 T/ 0 (,Jr Corner Lot: (YES / I& Flag Lot: (YES /00 Variance: eline: ADB: 'k 0 0 -7 — (V� CUP: Pre-App: C) 1. 1&.+. 0 -7 LLA: Plans Match ADB Approved: (6) NO) Lot Aggregation Required: (YES /& con G1 05 Use Proposed: M �A J-h -f-0 Vy) %y (3) Use Permitted: NO) J55()C>+l1570&= a. & =_ -3 ci U rn a SUbdivision/Legal/Recording Number: Legal Nonconforming Land Use Determination Issued: (YES/ E�rf�� -tV lDe, r-e-MCWtC� Critical Areas File Number: C,12-A - 'k 007. 0110 Study Required waiver SEPA Determination: PN_5 +Dr 1000 Cyct_S (T13p > 500 cubic yards of grading? to 5 - new dwelling units? i55wiexl corylple+c, On 12-7-1.7,.007 El- Parking f or 20 - vehicles? 9'LS r,)IG16 CLAt (+_Ofill) 5nDWV1 El >4000 square feet of new commercial area? Required Setbacks Street: Side: to Side: W Rear: ACtUalSetbacks Street: Side: ___[�Oe: 1C) 7 1 ol Rear: 19 1 Pik N structures: Rockeries/Retainin ence rellises/Arbors 9 Trasri Enclosure 9 Signage ge� I , � �! � i' � � � 7 M Modulation: Bay Windows 9 Projecting n 9 CI I -e 4 Encroacriments: Covered DeCk/Porcn Uncovered Unenclosed < 30" Deck/Porch/Patio ZL !/P0r:C!hn/PaVo > 30" Stairs 9 > Eaves f�a Vt_b t U-te in '�D Parking Required: Parking Provided:, Coverage R &auired: k Coverage Provided: LotArea: 55ooq� Lot Coverage -1 1+ 2- cl 15 Calculations., Building HeIgpt Datum Point: LM e W 6k 1< Datum Elevation: Maximum Height.- -'�5+57 Actual Height: (077 Signage Existing/Proposed: WDYle c7ViowvI &)(crpt oLcJc1re*_,, s-z,-1 tAc41p I -e, Plan Review By: Gina Coccia, Associate Planner A,, a4,1 c x 5 4 (06 , 10 PLANNING DATA x 1-z"im ;� Dr- . ) Multi -Family * Commercial Strw L0ndSCQP1ngN0teS Land'scaping Matcries ADE(Approved: NO) Landscaping Bid Provided NO) 0—'9 Landscaping Bid Amount: S Landscape Ins pectionfee: S comniercial Parking Analysis Business Name Type/Use Parking Ratio Tenant Area Required Parking To tCY1 Parkiag Required. To tol Porkin g Pro vided: Witi-FaMlly ParkfngAnaly�;Is' # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1.2/D.U. I Bedroom 1.5/D.U. 2! Bedrooms 1.8/D.U. 3 - Bedrooms 2.0/D.U. f0tol Porking Required. - To tol Porkin 9 Pro vided: (00 other Ic rA CA,)4 ot .00 'CID + 7-5 12, E5 ubD:.*16115� pitrht� RW VI - (0 -7 1 t-ZLU I Plan Review By: Gina Coccia, Associate Planner APPLICATION for The City of Edmonds SIDE SEWER PERMIT NEW CONSTRUCTION E] . REPAIRS 0 EASEMENT No . .......................................... /0,3-0 OWNER ...,iox-4� ... 6-1 .................................. --- CONTRACTOR .................................................................................................. PERMIT No... ..................... ADDRESS ----------------------------------------------------- LEGAL DESCRIPTION: LOT No..-*.-. ........................................ BLOCK No . ............................................. 0 pj Is I NAME OF ADDITION ....................................... Ifl.2 ppro DATE.......................................... ..... By ...................................................................... 6,V ED4 mr: 1 0 -St. Purpose of Checklist. CITY, -OF EDMONDS ENVIRONMENTAL CHECKLIST. The State Environmental Policy Act (SEPA), chapter 43.21 C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from yQur proposal,(and to reduce or avoid impact.$ from the proposal, if it can be done) and to help the aiiency:decide wlietherari EiS is reqilir'ied. Instructionsfor Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or does not apply". Complete answers to the questions now may avoid unnecessary delays later- . -Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if -i can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal. or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklistfor nonproject proposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part 0). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposer," and "affected geographic area," respectively. A. BACKGROUND 1. Name of proposed proj - ect, if applicable: tss-i M A. f suv_ _22— 11 �AJ I 'C' 6 6,J i:1 0 2. . Nameof ap1)1ican1.:. 391f M 01,13,1AL 3. A dre�s­andphope numberpf a Dficant-and contact ptrson: -A -7 -7 2% 4. Date checklist prepared: 10 - 0 R E e7 Vgm Lo b Agency requesting checklist: City of Edmonds JUN i BUILDING U&I-I Page I of24 h-L I., 6; Proposed liniing or schedule (including phasing, if applicable): + I'Z t2 (STAFF COMMENT. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. L-,�!&) V It J AM-. ARI> % -e>-9— (STAFF COM 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. (STAFF COMM 9. Do you know whether applications are pending for governmental approvals (if other proposals directly affecting the property covered by your proposal? If yes, explain. I -'N11 Na LZMWW—�� a WWMRML� (STAFF COMM Page 2 of24 sepa ch"Hist - p.bfic doc.4.3 2006 List any -government approvals or permits that will be needed for your proposal, if known. I J>r I R—ILS It =k Le, I ca F-1EA9d&4 17 A#%Jg> A-U- "b E20 1 L C> it,-% (STAFF 11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site. There are several questions later in this checklist.that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. A/ (STAFF COMMENTS 4.7 C1 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your .proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. W i%J 41A 01 &c, I A'Ours T.9 6- :cx!%r '­2_�>' 'aF L..o-r 97'.' F=> c- ini i* Enriepar>!!t, t Aex_osj� w!4 -m -rqi: ft-AT- Z_ P 61F OJ P 46 at 1!%W 46 0 isi!tnq (STAFF COMMENTS) Page 3 of 24 TO BE COMPLETED BY APPLICANT B. NVIRONMRN-TAL FLEMENTS 1. Earth 'Ge e hilly', steep,slopes, mountainous,- other: a. n rat Oescripii"::or the gite (circ.le one): Flat-4a> C_- 1�=� ILI 1;-!=, (STAFF COMMENTS) b. What is the steepest slope on the site (approximate percent slop*e)?_ 1717 p 1 . -0 S Xi f.-r V--V—td 0 %-t K 7% -r—kLr'&3 -ra I r- I T-9 __16za L 015- Ft- X�- (STAFF COMMENTS) C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. _4LVt.jj(4 t7AVj6t!j,j04r'h (STAFF COMMENTS -7- 12Vy. tykt.- u U e t If So,- describe. A. Are ther' surface. indications or'history of unstable soils in the immedia e vicinity. (STAFF COMMENTS) Page 4 of24 sepa checklist - public, docA 3.2006 0 0 Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source of -fill. (STAFF COMM E Could crosiork.occur 'as wresult of clearing,- construction, or_090; If so;gelherally describe. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 4/_ (pLq % — IS�5a-!�b S-P :�!DRSOVCWAq 15+1-7- -51 'S La T- (STAFF COMMENTS) h. Proposed measures to reduce or control erosion, or other impacts lo the earth, if any: -tl T! 10 WA-Aq ri .1 dr-1 C-V*j !rMo" 11facnD !S r-> 0 *41 PJ C., 'Asin, L_4_%JM AHex,40�16 (STAFF COMMENTS) 2. AIR a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, and industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. I C_A�L, e cm) s.T-A-0 C--n &ya 0109-14- !�4 PE rX 11L AA.177M =MLUT-_ N I V 14r-- L-AE M I -s"S. I a A.,7!:-, (STAFF COMMENTS) Page5 of24 sepa check fisi - publicAm 4.3.2006 b.__ Are there any off -site sources of emissions or odor that may effect your proposal? If so, generally describe. (STAFF -COMMENTS) C. Proposed measures to reduce or control emissions or other impacts to the, if any: r—o"-TMOL., !T31AIL- jDf 4c )Can 0-1 _L"M. (STAFF COMMENTS) 3. WATER a. Surface: (1) Is there,any surface water, body on o,r ip the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, and wetlands).? If yes, describe type and provide names. If appropriate, state' what stieam, or river'it flows'into: 0- (STAFF COMMENTS) '(2) Will the project require any work over, in, or adjacent to (withirt 200 -feet), the'described waters? If yes, please describe and attach available plans. (STAFFCOMMENTS) (3) Estimate the amount of rill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate th e source of rill material. /A, (STAFF COMMENTS) Page 6 of 24 sepa checklisi - public doc:4.3,2006 0 0 (4) Will the proposal require surface water withdrawals or diversions? Give general description, --purpose, and approximate quantities if known. (STAFF COMMENTS (5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. (STAFF COMMENTS) (6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. C, 1,3 U-M, (STAFF COMMENTS) b. Ground: (1) Will ground water be withdrawn, or will 'water be discharged to ground water? Give general description, purpose, and approximate quantities if known. A !nlL&gt4N Lw-vEA. rnephi F0 AID N (STAFF COMM Page 7 of 24 sepa checklist - public doc:4 3.2006 0 (2) Describe waste material that will be discharged into the ground fi-om septic tanks or other sources, if - any (for example: Domestic sewage; industrial, containing the folloWing chemicals ... ; agricultural; Describe the general size of the system,'the number of such systems, the number of houses to be,, servcd,(if applicable), or the number of animals or.,humans the system(s) are expected to serve. I> tjlL�- (STAFF COMMENTS) C. Water Runoff (including storm water): (1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. &t-1 ZO P4 0- V L- L A-Irl"' "Te- t2NI-413S dmmft WILt W3E e---rgAm )KrT'b 'A. .&JAIJ :TIM (STAFF COMM (2) Could waste materials enter ground or surface waters? If so, generally describe. (STAFF COMMENTS) 0. Proposed meas�res to reduce or control surface, ground, and runoff water imparts, if any: -V!g. -r-t_!7 t-rnapmj 1�j i L. 4-- TV� Jk$,%M 9-1ALD F471L -r**X. rij JE J &.Ac> 1sj "A (STAFF COMMEN Page 8 of 24 sepa checklist - public. doc:4.3.2006 Plitnts a. Check or -circle ty "'divegetatio-fi fou�d-dn the site: pes, ttlee: -alder,46R4 "pen, other: ever-'reen tree: fir, cedar, pine, other: g shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other: water plants: water lily, eelgrass, milfoil, other: other types of vegetation: (STAFF COMMENT b. What kind and amount of vegetation will be removed or altered? S" A -a- Avy 0 ...A A —CP2" C-so %J4-9PAjr_ -am le 66 (STAFF COMMENTS) P"r)o,5,cd,, Lxyuk�itAwte Nam rcqL"*rf5 aAll ;2L, 5t7tff - C. List threatened or endangered species known to be on or near the site. Q &JIE (STAFFCOMMENTS) Page 9 of 24 sepa chmk list - PubliC. (10C, 43. 2006 d.-I Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site, if any: L A] 1=> I rJ TXA? (STAFF COMMENTS) 5. Animals 8. Check or circle any birds and animals that have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, dviUiDISA�: "bf-A-CAU1 .1 mammals: deer, bear, elk, beaver, qp�eft Q I go-c J� fish: bass, salmon, front, herring, shellfish, other: (STAFF COMMENTS) b. List any threatened or endangered species known to be on or near the site. 0 J1.3y, (STAFF COMMENTS) C. Is the site part of a migration route? ' If so, explain. tJ ip (STAFF COMME Page 10 df 24 sepa checkho - public. doc:4.3.2006 0 0 d.-- -Proposed measures to preserve or enhance wildlife, if any: (STAFF COMMEN 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whetbLitr i ,�Vll be used for heating, manufacturing, etc. 7 P 61t, (STAFF COMMENTS) b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. (STAFF COMMENTS) C. What kinds of energy conservation features are included in (be plans of this proposal? List other proposed measures tol.reduce or.control.energy impacts, if any:. (STAFF COMMENTS) Page I I of 24 �ep- ch-k1w - P.blic d- 4 1 7.- Environmental Health a. Are —there any environmental health hazards, including expos.ure-Ao to'iic chemicals, risk of fire and� explosion, spill; or hazardous waste, that could occur as a. result of this proposal? If so describe. -M6T (STAFF COMMENTS) (1) Describe special emergency services that might be required. (STAFF COMME (2) Proposed measures to reduce or control environmental health hazards, if any: (STAFF COMMEN b. Noise (1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? (STAFF COMME Page 12 of 24 sepa checklist - public. doc:4.3.2006 I 0 (2). What types and levels of noise would be crea ' Led by or associated with the project on a short-term or s X3 ff n'. a lofig--Term� liaids� (for e mple'-- -tr*a ic, truction, operitio other)?' Indicate what hour's noisi c6n� would come from the site. IS Aftex -nEP.K: :T�q eC_A&-L__ C--d:, Al b I _4�_ JE - LL_ "o L) Pioposed'm"s6res to redumor control noiseimpocts, kfbny: J3) (STAFF COMM Noise is regulated by Edmonds Community Development Code Chapter 5.30: NOISE ABATEMENT AND CONTROL. 8. Land and Shoreline Use S. Wha'Hs-ihe current use of the sitel*�ad adja"Cent pribpertres?­'� C, Ir itr- TWC IS cm - to., A !Fz� 1 ^3z, Lz- AIA& I L-W r_AJc_Ar_ w- A-c-z o�_M f-R-0 M4_1 i r- AU_ e ­6 fijx2gn 1A4 I I LJ(-Yt -S (STAFF COMMENTS) JVI C- tl I't& Ct f yVJ: tA Iii — fn VVL.I'l b. Has the site been used for agriculture? If so, describe. A - (STAFF COMMENTS) Page 13 of 24 ScPa Chccklisl - Public doc::43.2006 d. Will any structures be demolished? If so, what? (STAFF COMMENTS) ft 6_(*VL0 i 6L,`-!&.0A_ C6,6uta bkl*w ,7 e. What is the current zoning classification of the site? U (STAFF COMMENTS) L4 Lt Pt c;lti' At," -hA What is the current comprehensive plan designation of -the site? Z u1n, Uri iT* (STAFF COMMENTS) 9- If applicable, what is the current shoreline master plan designation of the site? /A I ' (STAFF COMM Page )4 of 24 sepa checklist - puL4ic.doc:4.3.2006 0 0 h: - Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. k (STAFF COMMENTS) A VO 0 0 (10 i. Approximately how many people would reside or work in the completed project? 12 6,6 02 L41! t-1 I I t RX-5h, 109— 1 Al t&L (STAFF COMMENTS) :Zn r e.& 47 LJ j. Approximately how many people would the completed project displace? A,-iX C*J E— (ST AFF COMMENTS)... f2t*"A'J-!J k. Proposed measures to avoid or reduce displacement impacts, if any: (STAFF COMMENTS) Proposed measures to ensure the proposal is compatible With existing and projected land uses and plans, if any: m W-4r x-s� r.t.) eX-lr—"-r L—k-oor-A (STAFF COMMENTS) -�I"i U�PIMIWPJ I Al J Page 15 of24 scPa Checklist - Publit,ADCA,3.2006 9.. H .pus-ing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-incomej housing. 0&j vre.. (STAFF COMMENTS) b.' Approximately how many units,'if any would be eliminated? I n icate wheilier.high, middle, or low-income housing. tit olpf-r— I" comiL_ Ab tj (4 VA31 Jr - (STAFF COMM E C. Proposed measures to reduce or control housing impacts, if any: C_ '2- ti era-y- t -n 3y�jA L_ �4.j s, , #,j c. (STAFF COMM 10. Aesthetics 3. What is the tallest height of any proposed structure(s), not including antennas; what is the principle exterior building material(s) proposed? (STAFF COMM Page 16 of 24 Sepa chccklml - pub[w d".4 3.2006 0 b. What views in the immediate vicinity would be altered or obstructed?. M-r- (STAFF COM C. Proposed measures to reduce or control aesthetic impacts, if any: (STAFF COMMENTS) I-fOA-r- 61d tyy. c *4 k-a lkl�2fAr%A -112T A AR6 V 11. Light and Glare a.. What type of light or glare will the-propqsal.lo . roduce? What,.tiiiie of day would it mainly occur? Aa: I Li NIZO d 41V &� t i Jh jJ ir A4sr lb t-4 CA Wr TnR�o 11-A (STAFF COMMENTS) b. Could light or glare from the finished project be a safety hazard or interfere with views? A�tJ o- -r Orm- e C-6 A, 10 A (STAFF COMMENTS C. What existing off -site sources of light or glare may affect your proposal? (STAFF COMMENTS) Page 17 of 24 Proposed measures to reduce or control light and glare impacts, if any: NJ DiltJ F- ECDC 20.1t.M.B.8: 'Exterior lighting shall be the minimum necessary toy safety and security. Excessive brightness shall be avok led. All lighting shall be tow -rise and directed downward onto the site. Lighting standards and patterns shall be compatible with the overall design theme. 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? A odc�. A, r—>ZNA-JA1q6WPJ C-0 P-12 1 (STAFF COMMENTS) fJC&VtU15AY1LU.A0 u-44- 4rz1C% 5 CA YO S, t am b. Would the proposed project displace any existing recreation uses? If so, describe. A fINJ (STAFF COMM ENTS) .:' ` - - C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: (STAFF COMMENTS) Page 18 of 24 sepa checklist - public.doc:4.3.2006 0 13. Historic and Cultural Preservation Are:there any places or objects listed on, or- proposed for- national, state, or -local preservation registers a known to be on or next to the site.?. If so, generally- describe. 14. (STAFF COMMENTS) b. G.erferally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. o tir' (STAFF COMMENTS) C. Proposed measures to reduce or control impacts, if any: Should archaelogical materials or human remains be observed (STAFF COMMENTS)— during project activities, all work in immediate vicinity should stop. The State Department of Archaeology & Historic Preservation ( 360.586.3065) the Planning Division (425.771.0220) and the county coroner (dapplicable) should be contacted immediately. Compliance with all applicable laws (RCW27.53,27.44,&WAC25A8) is required - failure to do so could constitute a Class G Felony. I ""Sporlat On Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. 5 [TIL A c-e—g FXnM M A, FLX- -Z----r (STAFF COMMENTS) Page 19 of 24 �pa chmkliss - Public. doc, 4.3. 2006 0 0 b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit stop? -P 7T794r- OZAAZLe. 4r (STAFF COMMENTS) C. How many parking spaces would the completed project have? How many would the project eliminate? e"^jQ 0L-r'-0C'0 F AA-lf- t Ai G� 'N F-^.4 t T*t, Lje>UL.C> T—L- % rA %" lwm_ A4& V--4r, 1 C, (STAFF COMMEN d. Will the proposal require any new roads, streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private).. C� ::DA XE C>Ai L-!i im PP-0VV-.hdX-ArM L. L 322T— I ilk tQ r— 6, L e—U&IS 6-111 4:69- -I*V— L'.9 IN/lE U 04 I (STAFF COMMENTS) e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, I generally describe. (STAFF COMMENTS) Page 20 of 24 Sep checklisl - pubficdoc:4.3.2006 -16. Utilities krele fil, _�ies c -r- V60 refe!��Sice' tel(ff�rl a. C' t urrently available at the site: cqe:c:i�rl VTura 0s, `Qca�nry �r, septic system, other: (STAFF COMMENTS) b. Describe the utilities that are proposed for the project, the utility providing the service, and the . general construction activities on the site or in the immediate vicinity which might be needed. (STAFF COMMENTS)_ C1r)MCaE7t C. SIGNATURE The above answers are truq to. the best of my knowledge. 1. pnderstand that the lead agency is relying on them to make its decision. Signature of Proponent Dale Submitted Page 22 of 24 sepa checklist - public. doc: 43.2006 r.--- How m\nymvehicular trips per day would be generated by the completed project? If known, indicate when peak ��ol es would occur. (STAFF 9- Proposed measures to or control transportation impacts, if any: (STAFF COMMENTS) 15. Public Services a. Would the project result in an i �re s d n\eedr public services (for example: fire protection, police protection, health care, schools, her)? If so, gene lly describe. (STAFF COMM b. Proposed nieasures to reduce or control direct impacts on public services,if any: (STAFF COMMENTS) r. Page 21 of 24 �pa checklisi - public. doc. 4.3. 7006 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT -t-q C C) "I Planning - Building - Engineering Letter of Transmittal GARY HAAKENSON MAYOR Date: December 7, 2007 To: Environmental Review Section Department of Ecology P.O. Box 47703 Olympia, WA 98504-7703 th Subject: 21911 76 Ave. W., Suite 2 10 Edmond (File No. ADB-2007- 64) Transmitting Determination of Nonsignificance and Environmental Checklists For Your Information: X As you requested: For your file: Comment: Note attachments: X Cc: Comcast DNR SEPA Center Snoh. Co. PUD PSE 'rGB Architects Vincent Borcich Sincerely, Diane Cunningham, Administrative Assistant Incorporated August 11, 1890 Sister Citv - Hpkinan. .1anan 01 O� EbA,() CITY OF EDMONDS 121 5TH "ENUE NORTH, EDMONDS, WA 98020 (425) 771-0220 RCW 197-11-970 Determination of Nonsignificance (DNS) DETERMINATION OF NONSIGNIFICANCE Description of proposal: The proposed project is to construct three dwelling units in one building. The property is located at 527 Maple Street and is currently developed with one single family house, which will be removed with a demolition (building) permit. The site is approximately 5,500 square feet in area. It is anticipated that there will be approximately 1,000 cubic yards of material to be excavated. Review and approval by the Architectural Design Board (ADB) is required and the public hearing is currently scheduled for January 2, 2008 (File Number ADB-2007-64). Proponent: Joe Molina of Taylor Gregory Butterfield Architects: 21911 76 1h Ave W - Ste 2101 Edmonds. Location of proposal, including street address if any: 527 Maple Street, Edmonds. Lead agency: CITY OF EDMONDS. The lead agency has determined that the requirements for environmental analysis and protection have been adequately addressed in the development regulations and comprehensive plan adopted under chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW 43.21C.240 and WAC 197-11-158 andlor mitigating measures have been applied that ensure no significant adverse impacts will be created. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. XX This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below. Comments must be submitted by December 21, 2007. Project Planner: Gina Coccia, Planner Responsible Official: Rob Chave, Planning Manager Contact Information: City of Edmonds 1121 5th Avenue North, Edmon ds WA 98020 1425-771-0220 Date: VP1 0 +1 V00-4- Signature: (MMAAI- +QV- P-V[:-6 LUAVC— I a U_ XX You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue North', Edmonds, WA 98020, by filing a written appeal citing the specific reasons for the appeal with the required appeal fee, adjacent property owners list and notarized affidavit form no later than December 21, 2007. You should be prepared to make specific factual objections. Contact Rob Chave to read or ask about the procedures for SEPA appeals. XX Posted on December 7, 2007, at the Edmonds Public Library, Edmonds Community Services Building, and the Edmonds Post Office. XX Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the Checklist. Page I of2 SEPA DETERMINAnONDOC 1217/07.SEPA 0 0 • Mailed SEPA Determination to properties within 300 feet of the site. • Mailed SEPA Determination and the Environmental Checklist to the following: XX Dean.Saksena, Senior Manager XX Environmental Review Section Snohomish Co. PUD Department of Ecology PO Box 1107 P.O. Box 47703 Everett, WA 98206-1107 Olympia, WA 98504-7703 XX Puget Sound Energy XX COMCAST Attn: Elaine Babby PO Box 90868, M/S XRD-1W Outside Plant Engineer, North Region Bellevue, WA 98009 410 Valley Ave NW #12 Puyallup, WA 98371-3317 XX Applicant: Joe 10olina XX DNR SEPA Center TGB Architects 21911 76"' Ave W —Suite 210 P.O. Box 47015 Olympia, WA 98504-7015 Edmonds WA 98026 XX Owner: Vincent Borcich PO Box 1403 Edmonds WA 98020 Attachments pc: File ADB-2007-0064 SEPA Notebook MAIN ST yj W < .�A > F_ LO :E t_ .DAYTON ST (0 SITE. 527 Maple Street MAPLE ST Page 2 of 2 SEPA DEMMMATION-DOC 12n/07.SEPA eq #P20 C&�e �No D Critical Areas Checklist Site Information (soils/ topograPhyay-d1a vegetation) M L_Zget 1.. Site Address/ Location: A P LI: IM!2!!M M RTM M11 M 2. Property TaxAccount Nurn 3S4 a js—�,,tio I NU 3. Approximate Site Size (acres or square feet): 0.1-5 4. Is this site currently developed? K yes; — no. If yes; how is site. developed?. 5. Describe the general site topography. Check all that apply - Flat less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over. a horizontal distance of 33 to 66-feet). ,Steep: grades of grea * ter than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ;Approx. Depth: 7. Site contains areas of seasonal standing water: Approx. Depth: E-11 What season(s) of the year? Site is in the floodway t1j� floodplain — of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? QJA Flows are seasonal? (What time of year? 10. Site is primarily: forested meadow shrubs — ------- n-dxed CEIVED urban landscaped (lawn, shrubs etc) 11. Obvious wetland is present on site: A N J 6 2008 EV#.D1N9DEPT For City Staff Use Only 1. Plan Check Number, if applicable? A 2. Site is Zoned? 1- 57 3. SCS mapped soil type(s)? I q — C_—Wrtt*1- ,a ,pe 4. Critical Areas inventory or C.A. map indicates Critical Area on site? 5. Site within earth subsidence landslide hazard area? DETERMINATION 1) - Reviewed ---------- *—STUDY REQUIRED 07 WAIVER "QC. 1 %91 #P20 C,ity of Edmonds Development Services Department Planning Division - Phone: 425.771.0220 Fax: 425.771.0221 The Critical Areas Checklist contained on this form is to be. filled out by; any person. preparing a Development Permit Application- for the- City of Edmonds prior to his/her submittal of the application to the Cit�. The purpose of the Checklist is to enable City staff.to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available fi-oin observations of the site or data available at City Hall (Critical areas inventories, maps, 'or soil surveys). Date Received: 0 �5 '7-0 0 City Receipt #:— a6 04'4' 2? Critical Areas File #: GF-A- - to 04 - 0 110 Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant A property owner, or his/her authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this forin to assist Citystaff in finding and locating the specific piece of property described on this form.. In addition, the applicant shall include other pertinent information .(e.g. site plm, topography map, etc.) or studies in conjunction wiffi this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/hcr/its heirs, and assigns, 'in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and al!l damages, including reasonable attorney's fees, arising fi7om any action or infraction based in whole or part upon false, misleading, inaccurate or icomplete information fumished by the applicant, histher/its agents or employees. By my signature, I cer* that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. SIGNATURE OF APPLicANT/AGENT J., DATE Property Owner's Authorizatiov By my signature, I certify that I have authorized the.above Applicant/Agent to apply for the subject land use application, and grant my permission for.the public offi,cials and the staff of the City of Edmonds to eriter the subject property for the purposes of inspection and sting attendprikto this application. SIGNATURE OF OWNER;. DATE PLEASE PRINT CLEARLY Owner/Appficant: IJ1. C^-, C- et-1-t Name 0 � Z)X I Lo Street Address city State Zip Applicant Representalive: o L-AVA Name -Z 19 1 TV AN11ir- Ll !�X-- 2- 16 Street Address City Swc,'- Zip ..,,;Iephone: 2--C)A Telephone: 445-- ITS - 15 -3-C) Email address (optional): 10 RLLn=C_,*:,StEmai1 Address (optional' ): J V11 0 c- f "'i A e -rZoO3,&A-44 47-OLCTS. C-c=" CEOTECH-0 CONSULTANTS, INC. — 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 *CU9_t1 q q -5 (0 M1 a March 28, 2008 * lk " ?PU0*T1bN Fxpezb JN 08095 Vince Borcich c/o Gram Sage Graves 144 Railroad Avenue, Suite 101 Edmonds, Washington 98020 Attention: Greg'Mummy Subject: Evaluation of Allowable Soil Bearing Capacity Proposed Condominium Building 527 Maple Street Edmonds, Washington Dear Mr. Mummy: via email greg@gramsagegraves.co. ST , i REET FILE On March 28, 2008 the undersigned principal engineer visited the subject site in Edmonds to observe the excavation of test pits and to assess the appropriate design bearing capacity for foundations of the new building. Our services were provided in general accordance with the limited scope authorized in our Contract for Professional Services. We have not seen the plans for the proposed development. However, from our discussions with you, we understand that the existing house will be demolished and a new condominium building will be constructed in. its place. The new building will be at least 10 feet from the property lines and will be burii�d 4 to 5 feet below the existing grade. This will allow the lower level to be accessed from the alley to the north of the site. We expect that the lowest floor will be a slab on grade. We observed the excavation of test pits on the north and south sides of the site. The undisturbed, native soil profile encountered in both of these test pits consisted of a thin layer of topsoil and one to 2 feet of orangish-brown, highly -weathered, slightly silty sand overlying medium -dense gravelly sands. In the northern test pit, closest to the alley, we observed approximately 6 feet of fill soil overlying the native soil profile. This fill appears to be gravelly sand that was originally excavated for the basement of the existing house. No groundwater seepage or wet soil conditions was observed in either of the test pits, which extended to a maximum depth of 9 feet. I Based on our observations, the medium -dense gravelly sand encountered in the test pits is suitable to support conventional foundations. In our professional opinion, an allowable bearing capacity of �­_ �.s� D,;-.tp.i3..,0Q07p.@u. ds P.6 _0&t_r;eJ046f__(0i�-is acceptable for this -soil. We recommend that the fc6—ndatio-ns -ffe—excavated with a smooth backffo-8F-bucket- o avoid disturbance of the clean sand. Following excavation of the footings, the subgrades should be recompacted using a small vibratory sled compactor. It appears that excavation on the north portion of the site will have to extend close to the level of the existing northern alley in order to reach suitable native bearing soils. If overexcavation below the planned footing subgrade elevations is necessary to reach the native bearing soils, either the foundations could be extended downward or the overexcavation could be backfilled with compacted quarry spalls or two -two 4-inch recycled concrete. RECEIVED J U N 1 6 2008 BU ILDING DEPT. Vince Borcich c/o GrarnSa aves JN 08095 March 28, 2008 Page 2 If you have any questions; or if we may be of further service, please do not hesitate to contact us. MRM: jyb Respectfully submifted, GEOTECH CONSULTANTS, INC. WA 277 IST NA LEXj�� Marc R. McGinnis, P.E. Principal GEOTECH CONSULTANTS, INC. OV E 1).41 f ILE CITY OF EDMONDS 121 5T H AVENUE NORTH - EDMONDS.WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 *PERMIT MUST BE POSTED ON JOBSITE* STATUS: ISSUED ENG20080423 RIGHT OF WAY PERMIT (2-Multi-Family) -- Perrnit Number: ENG20080423 Expiration Date: 1/2' )/2008 Job Address: 527 MAPLE ST, EDMONDS APPLICANT CONTRACTOR HOLTF CONSTRUCTION 1101-T E CONSTRUCT ION 402 OLYMPIC AVE 402 OLYMPIC AVE EDMONDS, WA 98020 EDMONDS, WA 98020 206-909-1775 Location: LICENSE #: HOLTECI044DB EXP� JOB DESCRIPTION 17OR DEMOLITION ONLY: SIDEWALK CLOSUREAND USEOF THE PARKING STRIP DIREcmy IN FRONTOF THE PROPERTY DU1RINGCI'I'YOI- I]MONDS CONSTRUCTION HOURS DISRUPTION INFORMATION ASSES:ED %�ALUE: $0.00 PROPERTY AREA 0 SIDEWALK: OXO DURATION IN MONTHS: 0 FEE: $0.00 S'I'REET DISRUPTIONTRENCH CUT: 0 X 0 1 PARKING: OXO DURATION IN MONTHS 0 FEE: $0.00 YEAR OF OVERLAY 0 FEE $0.00 A L L EY: OXO DURATION IN MONTHS: 0 FEE: $0.00 INDEMNITY The.-Iplilicunt has signed an application which states helshe holds the City of&hnonds hai-ndessfi-ont inl'uries. damages oi- claims ofant: k ind oi- desci-iption whalsoeverforeseen w- unforeseen, that may be made against the City qfEdinonds or anj: qfits delmi-Imews or emplolvees, including but not limited to the defense qfan); legal proceedings including k/ense costs and allorneYfiees bY reason ofgranling this permil. 'IIIECON'IRACTOR IS RFSPONSIBLEFOR WORKMANSHIP AND MATERIALS FOR A PERIOD OFONFYEAR FOLLOWING TIFE FINAL INSPFC'I1ON ANDACCEPTANCEOFnIEWORK • Traffic Control and Public safety shall be in accordance xvith City regulations as required by the City Engineer. Every flagger must be t rained as requ ired bv (WA C) 296-155-305 and must have certification verify ing completion of the requ ired trainin- in their possesion. • Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end ofthe workday- NO EXCEPTIONS. • Three sets ofconstruction drawings of proposed work are required with the perrnit application. CALL DIAL-A-DIC (1-800424-5555) BEFOREANY EXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT. 1326 24 HOUR NO-IFICEREQUIRED FOR ALL INSPECTION REQUIES-IN T1 I IS A PPLICA'IION IS NOT A PERMITUNT11- SIGNED BY THE CITY ENGINEER OR HISIHERDEPUTY: AND FEES ARE PAID. AND RECEIPT IS ACKNOWLEDGED IN f\ A SPACE PROXIDED. Printed: Th u rs day. October 23. 2008 BY \j ' F-] FILECOPY U\ INSPECTORCOPY F'� APPLICANT COPY STATUS: ISSUED ENG20080423 RIGHT OF WAY PERMIT (2-Multi-Fa"Iy) CONDIT IONS • Restore ROW to City standards • Restore Landscape to like or better conditions. • Call lor locates 01'Under-r0tind utilities prior to an), excavation. • Alert affiected residents and/or businesses prior to Nvork start. • Conform to approved working drawings and Traffic Control plan. • public utilities maintain 5'separation firornCity Utilities. • Verif-v clear bore crossings • Utility patch restoration to be in accordance with Edmonds Standard detail E2.3 • CDF is required for trench backfill. Refier to Edmonds Standard Detail B4.4 • Maintain erosion & sedimentation control. Keep street clean. • Construction hours are Monday -Friday 7arri-6pm and Saturdays l0am-6pin. No work on Sundays or Federal Holidays. • Call for required inspections as noted. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-ot-way per City standards that is caused by or occurs during the permitted pro ject. 0 � I 117- 'raffic Control E-Eneineerine Final PARTIAL INSPIX.-FION DA TE: INITIAL: NOTES: PARTIA L INSPECTION DATE: INITIAL: NOTES: 17INA 1, lNspi�-rl-ION A PPROVI--D DATE: INITIAL: 7 ­1 V tit (Y 9 0 .' 1 9 9 - Cit y . of Edmond* RIGHT-OF-WAY CONSTRUCTION PERMIT Permit Number: 9Z - 7— /6 Issue Date: *7 �A. Address or Vicinity of Construction: kwfle B. Type of Work (be specific):Dr i ve k.) A_�i C. Contractor: mc_e_ 601*64C,4, Contact: MailingAddress: Aadl Age. -36q�qo,-3k -7 71 State License #: Liability Insurance: Ilond: $ D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. - F1 Commercia! E] Subdivisionly El City Project E] Utility (PUD, GTE, WNG, C I ABLE, WATER) Ll I F. Multi- . S le Fami F] Other INSPEC-40R'AZ- C— � INSPECTOR: F. Pavement or\C_0ncret��t_-._--'LJ Yes '��No G. Size of Cut: x H. Charge$ 'A�PPLICANT TO READ AND SIGN INDEMNITY—, Applicant understands and by,hlg�ignature to this application, agrees to hold the City of Edmonds harmlessftom injuries, damages, or claims of any kind or desctipti"Zit foreseen or unforeen, that may be made against the City of Edmonds, or any of its departments or employ- ees, including or not limited to the defense of any legal proceedings including defense cons, and attorneyfees by reason of granting this permit. THE CON7RACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL NSPE ON I C77 AND ACCEPTANCE OF THE WORK. ES77MA TED RESTORA77ON FEES WILL BE HELD UN77L THE FINAL STREET PATCH IS COMPLETED BY. CITY FORCES, AT WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT tonsiiuction drawing of proposed work require� w"ith permit application. A 24 hou red for inspection.-, r ' notice is requi Please'eall the Engineering Deoiirtm A! Work is to be inspected during progress and at completion. 771-N20 Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with Ciq regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approyed material prior to the end of theworking day; NO EXCEPTIONS. I have re a emen s /ad the ab ve st t t and understandthepermit requ I tr,��enisa�d the pink copy of the permit will be available on site at all It e7ifor-inspection p, r oses. 'A'Iel� Date: eje,-4 z_7 Signature: M (Contractor or Xg-ent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK .... ... . FOR CITY USE ONLY :;;APPROVED BY- RIGHT OF WAY, DEPOSIT:,.,. . ......... '2r) .::,TUAE.AU,T.HORIZED�:.V.OID::AF.TER:;::::;"��:���: ..... DAYS:::::�. DISRUPTION. FEE/FUND:11111 .. ........ . ..... .. ... ... ......... ...... . .......... ... .. .... .... NO WORK..SHALL�BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 �4' FIELD INSPECTION NOW (Funpi Ll - Route copy to Street Mot'), Comments: I Diagram: w CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: r-ng. Lim jui 0 Vk4 tf Mj/1 I ON(L ZF /Ull I C-71 v C, 10. � d-P& Od I cl r'1102)(2 OL A04C 11 Iss 00- p aia�M-)Wop 6vit(-9 I ta Ict I Wl 6 9 0 . 199 - ...City of Edmond* RIGHT-OF-WAY. CONSTRUCTION PERMIT V- U XT-1, rM er: Issue Date: A. Addr ess or,Vicinity of Construction: B. Type of Work (be specific): 4.51tit �,/6d RECEIVED J U L 9 1992 C. Contractor: A4)<T- co'OVS7R)Croal Celi Contact: Mailing Address: �MIJX� AYE AE SE& 28&AS Phone: ;7 2_S-- 6ZO 0 OUINEERING State License Liability Insurance; Bond: $ D. Building Permit'.#'(if applicable):TZ03t?Z4Q0— Side Sewer P ermit #'(if applicable): E. X Commercial E] Subdivision F1 CityProject E] Utility (PUD, GTE, WNG, CABLE, WATER) El Multi -Family F]. SM& Family F-1 Other INSPECTOR: INSPECTOR� iuf r-i A tj -u I a/ av�m�a ux L-j a APPLICANT -To R"P'4ND SIGN cant understands . and by his signature to th --'Qes, da ages, or INDEMNITY. Appli is application, agre&whold the City of Edmonds har?nllss-�, ml tkjij4 5L claims of any )dnd or description.whatsoever, foreseen or unforeen, that may be madi `ag-qk�tst the Chy of Edmonds., or any of its departments. or employ- ees, including 'or not limited to the defense of any legal proceedings includin delensi-Z�;�';��4 attorneyfees by reason of granting ijkis- �g THE CONTRA CTOR IS RESPONSIBLE FOR WORKHANSHIP AND MA TERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC77ON AAD ACCEPTANCE OF 7HE WORK ES77MA 7ED RESTORA 7TON FEES WILL BE HELD UN77L THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES,, A T-WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Departin Sam Work is to be inspected during progr6§9inq,,,a completion. 771-0220 d Restoration is to be in accordance with City 0 es. Street shall he kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt 6'r'LC'ty Appro *ed niai�rial-*-prior to the end of*the)i�(jrkir'g'day; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink c6py of the permit will be available o st' e' ion purposes. n te at aal ttM Signature: Date: ntractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 IRFIELD INSPECTION No S Comments: Diagram: (Fund I I I - Route copy to Streit Dilpt�) I CONTRACTOR CALLED FOk INSPECTION 0 YES .0 NO Partial Work Inspection by P. W.:, Work Disapproved By: Date: FINAL APPROVAL BY- Date: Eng. Div. July 1985 OEOTECH CONSULTANTS, INC. Vince Borcich c/o Gram Sage Graves 144 Railroad Avenue, Suite 101 Edmonds, Washington 98020 Attention: Greg'Mummy Subject: Evaluation of Allowable Soil Bearing Capacity Proposed Condominium Building 527 Maple Street Edmonds, Washington Dear Mr. Mummy: 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 March 28, 2008 JN 08095 via email greg@gramsagogra ves. co. On March 28, 2008 the undersigned principal engineer visited the subject site in Edmonds to observe the excavation of test pits and to assess the appropriate design bearing capacity for foundations of the new building. Our services were provided in general accordance with the limited scope authorized in our Contract for Professional Services. We have not seen the plans for the proposed development. However, from our discussions with you, we understand that the existing house will be demolished and a new condominium building will be constructed in. its place. The new building will be at least 10 feet from the property lines and will be buried 4 to 5 feet below the existing grade. This will allow the lower level to be accessed.frorn the alley to the north of the site. We expect that the lowest floor will be a slab on grade. We observed the excavation of test pits on the north and south sides of the site. The undisturbed, native soil profile encountered in both of these test pits consisted of a thin layer of topsoil and one to 2 feet of orangish-brown, highly -weathered, slightly silty sand overlying medium -dense gravelly sands. In the northern test pit, closest to the alley, we observed approximately 6 feet of fill soil overlying the native soil profile. This fill appears to be gravelly sand that was originally excavated for the basement of the existing house. No groundwater seepage or wet soil conditions was observed in either of the test pits, which extended to a maximum depth of 9 feet. I Based on our observations, the medium -dense gravelly sand encountered in the test pits is suitable to support conventional foundations. In our professional opinion, an allowable bearing capacity of up to 3,000 pounds per square foot (psf) is acceptable for this soil. We recommend that the foundations be excavated with a smooth backhoe bucket to avoid disturbance of the clean sand. Following excavation of the footings, the subgrades should be recompacted using a small vibratory sled compactor. It appears that excavation on the north portion of the site will have to extend close to the level of the existing northern alley in order to reach suitable native bearing soils. If overexcavation below the planned footing subgrade elevations is necessary to reach the native bearing soils, either the foundations could be extended downward or the overexcavation could be backfilled with compacted quarry spalls or two -two 4-inch recycled concrete. RECEIVED JUN 1 6 2008 STREET FILE BUILDING DEPT. Vince Borcich c/o I GramSa*raves JN 08095 March 28, 2008 Page 2 If you have any questions; or if we may be of further service, please do not hesitate to contact us. MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. r, 2 Zt, r , 01 T EX RES O'F Marc R. McGinnis, P.E. Principal GEOTECH CONSULTANTS, INC. ;,CEOTECHO CONSULTANTS, INC. Vince Borcich c/o Gram Sage Graves 144 Railroad Avenue, Suite 101 Edmonds, Washington 98020 Attention: Greg'Mummy Subject: Evaluation of Allowable Soil Bearing Capacity Proposed Condominium Building 527 Maple Street Edmonds, Washington Dear Mr. Mummy: 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 March 28, 2008 JN 08095 via email greg@gramsagegraves.co. On March 28, 2008 the undersigned principal engineer visited the subject site in Edmonds to observe the excavation of test pits and to assess the appropriate design bearing capacity for foundations of the new building. Our services were provided in general accordance with the limited scope authorized in our Contract for Professional Services. We have not seen the plans for the proposed development. However, from our discussions with you, we understand that the existing house will be demolished and a new condominium building will be constructed in. its place. The new building will be at least 10 feet from the property lines and will be buribd 4 to 5 feet below the existing grade. This will allow the lower level to be accessed from the alley to the north of the site. We expect that the lowest floor will be a slab on grade. We observed the excavation of test pits on the north and south sides of the site. The undisturbed, native soil profile encountered in both of these test pits consisted of a thin layer of topsoil and one to 2 feet of orangish-brown, highly -weathered, slightly silty sand overlying medium -dense gravelly sands. In the northern test pit, closest to the alley, we observed approximately 6 feet of fill soil overlying the native soil profile. This fill appears to be gravelly sand that was originally excavated for the basement of the existing house. No groundwater seepage or wet soil conditions was observed in either of the test pits, which extended to a maximum depth of 9 feet. Based on our observations, the medium -dense gravelly sand encountered in the test pits is suitable to support conventional foundations. In our professional opinion, an allowable bearing capacity of up to 3,000 pounds per square foot (psf) is acceptable for this soil. We recommend that the foundations be excavated with a smooth backhoe bucket to avoid disturbance of the clean sand. Following excavation of the footings, the'subgrades should be recompacted using a small vibratory sled compactor. It appears that excavation on the north portion of the site will hove to extend close to the level of the existing northern alley in order to reach suitable native bearing soils. if overexcavation below the planned footing subgrade elevations is necessary to reach the native bearing soils, either the foundations could be extended downward or the overexcavation could be backfilled with compacted quarry spalls or two -two 4-inch recycled concrete. Vince Borcich c/o GramS* raves JN 08095 March 28, 2008 Page 2 If you have any questions; or if we may be of further service, please do not hesitate to contact us. MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. T'6- AT C -'P 'WA 0 27US Li Marc R. McGinnis, P.E. Principal GEOTECH CONSULTANTS, INC. 0 OEOTECH CONSULTANTS, INC. Vince Borcich c/o Gram Sage Graves 144 Railroad Avenue, Suite 101 Edmonds, Washington 98020 Attention: Greg Mummy Subject: Geotechnical Engineering Study Proposed Condominium Building 527 Maple Street Edmonds, Washington Dear Mr. Mummy: 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 October 14, 2008 e__Z� U FC-31) � § DP e) OCT 14 2008 �)UILDING DEPARVENT r,I-FY OF EDMONDS JN 08095 via email We are pleased to present this geotechnical engineering report for the new condominium building to be constructed in Edmonds, Washington. The scope -of our services consisted of exploring site surface and subsurface conditions, and then developing this report to provide recommendations for general earthwork and design consideration for foundations, retaining walls, seismic conditions, subsurface drainage, and temporary excavations. This work was authorized by your acceptance of our Contract for Professional Services. We were provided with the Permit Set of architectural and structural plans prepared by Taylor Gregory Butterfield Architects and CG Engineering, respectively. These plans were dated August 19, 2008. From this information, we expect that the existing house will be demolished, and a new 3-unit condominium building constructed in its place. The new structure will have three stories, with parking on the lower level accessed from Maple Street on the south side of the site. The lower floor's slab elevation will be 96.25 feet,,requiring excavation of up to approximately 6 feet below the existing ground elevation. An elevator pit will extend below the floor slab in the center of the eastern side of the building. The west and east walls of the building will be set back at least 10 feet from the property lines,'but retaining walls are shown at these property lines to retain cuts that will lower the site grades below the adjacent lots. Paved, on -grade parking is shown along the north side of the site, to be accessed from the alley. If the scope of the project changes from what we have described above, we should be provided with revised plans in order to determine if modifications to the recommendations and conclusions of this report are warranted. SITE CONDITIONS SURFACE The site is a rectangular lot situated between two condominium buildings. Maple Street borders the southern property line, and a paved alley extends along the northern site boundary. The existing house is situated in the central portion of the lot, with a small garage and a concrete patio off the STREET FILE Vince Borcich JN 08095 October 14, 2008 Page 2 north side of the house. The ground surface on the majority of the lot slopes very gently down toward the north, varying in elevation from 102 feet to 98 feet. Along the southern edge of the lot is a short rockery protecting a grade change of 3 to 4 feet down to the sidewalk. There is also a 3- to 4-foot rockery along the northern property line, where the alley is lower in elevation than the site. There are no steep slopes on, or near, the site. SUBSURFACE The subsurface conditions were explored by excavating two test.pits at the approximate locations shown on the attached copy of the Topographic Survey. Our exploration program was based on the proposed construction, anticipated subsurface conditions and those encountered during exploration, and the scope of work outlined in our proposal. The test pits were excavated on March 28, 2008 with a rubber -tired backhoe. A geotechnical engineer from our staff observed the excavation process, logged the test pits, and obtained representative samples of the soil encountered. "Grab" samples of selected subsurface soil were collected from the backhoe bucket. The Test Pit Logs are attached to this report. Soil Conditions The two test pits encountered similar native soil conditions. Beneath a thin layer of topsoil was loose, gravelly sand containing a low percentage of silt. Th ' is coarse -grained soil became medium -dense within one to 3 feet of the topsoil. In Test Pit 1, located on the northern portion of the site, there was approximately 6 feet of uncompacted fill overlying the native sand. This fill appears to have been placed when the lot was originally graded, in order to create a more level yard area, and is probably soil that was excavated from the existing house. The rockery along the north side of the lot appears to retain the uncompacted fill. The rockery on the south edge of the site protects only native soil, apparently a short cut that was made for construction of the sidewalk. Groundwater Conditions No groundwater or wet soils were observed in the test pits. Considering the granular, moderately -permeable nature of the soils, we do not expect that significant groundwater will be encountered within the depth of the test pits. It should be noted that groundwater levels vary seasonally with rainfall and other factors. The stratification lines on the logs represent the approximate boundaries between soil types at the exploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. The relative densities and moisture descriptions indicated on the test pit logs are interpretive descriptions based on the conditions observed during excavation. The test pit backfill was not compacted. Loose soil will therefore be found in the area of the test pits. If this presents a problem, the backfill will need to be removed and replaced with structural fill during construction. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 CONCLUSIONS AND RECOMMENDATIONS GENERAL JN 08095 Page 3 THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE PURPOSES OF A GENERAL OVERVIEW ONLY. MORE SPECIFIC RECOMMENDATIONS AND CONCLUSIONS ARE CONTAINED IN THE REMAINDER OF THIS REPORT. ANY PARTY RELYING ON THIS REPORT SHOULD RE4D THE ENTIRE DOCUMENT. The test pits conducted for this study encountered medium -dense, native, gravelly sand that is suitable to support the planned building using conventional foundations. It will be necessary to excavate through the existing fill, topsoil and loose soil to expose this suitable bearing soil. The slab floor of the lower level can be supported on native sand underlying existing fill and topsoil. Floor slabs should not be placed over the existing loose fill, as excessive post -construction settlement relative to the foundations would result. Storm detention/retention facilities and other utilities are often installed below, or near, structures. The walls of storm vaults must. be designed as either cantilever or restrained retaining walls, as appropriate. Wall pressures for the expected soil conditions are presented in the Permanent Foundation and Retaining Walls section of this report. It is important that the portion of the structure above the permanent detained water level be backfilled with free -draining soil, as recommended for retaining walls. Should drainage not be provided, the walls must be designed for hydrostatic forces acting on the outside of the structure. The backfill for all underground structures must be compacted in lifts according to the criteria in the General Earthwork and Structural Fill section of this report. Trenches for underground structures and utilities should not cross a line extending downwards from a new or existing footing at an inclination of 1:1 (Ho rizonta 1: Vertical). We should be consulted if these excavation zones will be exceeded for installation of storm facilities or other utilities. Temporary cuts for construction of foundations, retaining walls and other structures should not be steeper than 1:1 (H:V). This should be possible for the planned building. However, adequately - sloped temporary cuts for retaining walls on the property lines would need to extend'onto the adjoining properties. Where it is not possible to obtain permission from adjoining owners for temporary excavation easements, then temporary shoring would be needed to maintain the cuts within the property boundaries. Alternatively, the configuration of the walls and grading could be modified to avoid cuts near the property lines. The erosion control measures needed during the site development will depend heavily on the weather conditions that are encountered. We anticipate that a silt fence will be needed around the downslope sides of any cleared areas. Rocked construction access roads should be extended into the site to reduce the amount of soil or mud carried off the property by trucks and equipment. Cut slopes and soil stockpiles should be covered with plastic during wet weather. Following rough grading, it may be necessary to mulch or hydroseed bare areas. that will not be immediately covered with landscaping or an impervious surface. The drainage and/or waterproofing recommendations presented in this report are intended only to prevent active seepage from flowing through concrete walls or slabs. Even in the absence of active seepage into and beneath structures, water vapor can migrate through walls, slabs, and floors from the surrounding soil, and can even be transmifted from slabs and foundation walls due to the concrete curing process. Water vapor also results from occupant uses, such as cooking and GEOTECH CONSULTANTS, INC. Vince Sorcich JN 08095 October 14, 2008 Page 4 bathing. Excessive water vapor trapped within structures can result in a variety of undesirable conditions, including, but not limited to, moisture problems with flooring systems, excessively moist air within occupied areas, and the growth of molds, fungi, and other biological organisms that may be harmful to the health of the occupants. The designer or architect must consider the potential vapor sources and likely occupant uses, and provide sufficient ventilation, either passive or mechanical, to prevent a build up of excessive water vapor within the planned structure. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. We recommend including this report, in its entirety, in the project contract documents. This report should also be provided to any future property owners so they will be aware of our findings and recommendations. SEISMIC CONSIDERATIONS In accordance with Table 1613.5.2 of the 2006 International Building Code (IBC), the site soil profile within 100 feet of the ground surface is best represented by Soil Profile Type D (Stiff Soil Profile). The site soils that will support the foundations are not susceptible to seismic liquefaction because of their medium -dense, coarse -grained nature and the absence of near -surface groundwater. As noted in the USGS website, the mapped spectral acceleration value for a 0.2 second (S,) and 1.0 second period (SI) equals 1.20g and 0.42g, respectively. CONVENTIONAL FOUNDATIONS The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed, medium -dense, native soil, or on structural fill placed above this competent native soil. See the section entitled General Earthwork and Structural Fill for recommendations regarding the placement and compaction of structural fill beneath structures. Adequate compaction of structural fill should be verified with frequent density testing during fill placement. Prior to placing structural fill beneath foundations, the excavation should be observed by the geotechnical engineer to document that adequate bearing soils have been exposed. We recommend that continuous and individual spread footings have minimum widths of 16 and 24 inches, respectively. Exterior footings should also be bottomed at least 18 inches below the lowest adjacent finish ground surface for protection against frost and erosion. The local building codes should be reviewed to determine if different footing widths or embedment depths are required. Depending on the final site grades, overexcavation may be required below the footings to expose competent native soil. Unless lean concrete is used to fill an overexcavated hole, the overexcavation must be at least as wide at the bottom as the sum of the depth of the overexcavation and the footing width. For example, an overexcavation extending 2 feet below the bottom of a 2-foot-wide footing must be at least 4 feet wide at the base of the excavation. If lean concrete is used, the overexcavation need only extend 6 inches beyond the edges of the footing. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 5 An allowable bearing pressure of 3,000 pounds per square foot (psf) is appropriate for footings supported on competent native soil. A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that the total post -construction settlement of footings founded on competent native soil, or on structural fill up to 5 feet in thickness, will be less than one inch, with differential settlements on the order of one-half inch in a distance of 50 feet along a continuous footing with a uniform load. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level structural fill. We recommend using the following ultimate values for the foundation's resistance to lateral loading: PARAME]'ER ULTMATE VALUE Coefficient of Friction 0.45 Passive Earth Pressure 300 pcf Where: (I) pcf Is pounds per cubic foot, and (ii) passive earth pressure Is computed using the equivalent fluid density. If the ground in front of a foundation is loose or sloping, the passive earth pressure given above will not be appropriate. We recommend maintaining a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above ultimate values. PERMANENT FOUNDATION AND RETAINING WALLS Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soil they retain. The following recommended parameters are for walls that restrain level backfill: PARAME11' R Active Earth Pressure * VALUE 35 pcf Passive Earth Pressure 300 pcf Coefficient of Friction 0.45 Soil Unit Weight 130 pcf Where: (I) pcf is pounds per cubic foot, and (H) active and passive earth pressures are computed using the equivalent fluid pressures. * For a restrained wall that cannot deflect at least 0.002 times Its height, a uniform lateral pressure equal to 10 psf times the height of the wall should be added to the above active equivalent fluid pressure. GEOTECH CONSULTANTS, INC. Vince Borcich JN 08095 October 14, 2008 Page 6 The values given above are to be used to design permanent foundation and retaining walls only. The passive pressure given is appropriate for the depth of level structural fill placed in front of a retaining or foundation wall only. The values for friction and passive resistance are ultimate values and do not include a safety factor. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the wall height from corners or bends in the walls. This is intended to reduce the amount of cracking that can occur where a wall is restrained by a corner. The design values given above do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need to be given the wall dimensions and the slope of the backfill in order to provide the appropriate design earth pressures. The surcharge due to traffic loads behind a wall can typically be accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Wall Pressures Due to Seismk Forces To model the surcharge wall loads that could be imposed by the design earthquake, we recommend adding a uniform lateral pressure to the above-recom mended active pressure. The recommended surcharge pressure is 7H pounds per square foot (psf), where H is the design retention height of the wall. Using this increased pressure, the safety factor against sliding and overturning can be reduced to 1.2 for the seismic analysis. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of a wall, unless the walls are designed for the additional lateral pressures resulting from the equipment. The wall design criteria assume that the backfill will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand -operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. Retainina Wall Backfill and Waterproofin Backfill placed behind retaining or foundation walls should be coarse, free -draining structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. If the native sand is used as backfill, a minimum 12-inch width of free -draining gravel or a drainage composite similar to Miradrain 6000 should be placed against backfilled foundation walls. Free -draining backfill or gravel should be used for the entire width of the backfill where seepage is encountered. For increased protection, drainage composites should be placed along cut slope faces, and the walls should be backfilled entirely with free -draining soil. The purpose of these backfill requirements is to ensure that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively impermeable soil or topsoil, or the surface should be paved. The ground surface must also slope away from backfilled walls to reduce the potential for surface water to percolate into the backfill. The section entitled General Earthwork and Structural Fill contains GEOTECH CONSULTANTS, INC. Vince Borcich JN 08095 October 14, 2008 Page 7 recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The above recommendations are not intended to waterproof below -grade walls, or. to prevent the formation of mold, mildew or fungi in interior spaces. Over time, the performance of subsurface drainage systems can degrade, subsurface groundwater flow patterns can change, and utilities can break or develop leaks. Therefore, waterproofing should be provided where future seepage through the walls is not acceptable. This typically includes limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the outside of the walls. There are a variety of different waterproofing materials and systems, which should be installed by an experienced contractor familiar with the anticipated construction and subsurface conditions. Applying a thin coat of asphalt emulsion to the outside face of a wall is not considered waterproofing, and will only help to reduce moisture generated from water vapor or capillary- action from seeping through the concrete. As with any project, adequate ventilation of basement and crawl space areas is important to prevent a build up of water vapor that is commonly transmitted through concrete walls from the surrounding soil, even when seepage is not present. This is appropriate even when waterproofing is applied to the outside of foundation and retaining walls. We recommend that you contact a specialty consultant if detailed recommendations or specifications related to waterproofing design, or minimizing the potential for infestations of mold and mildew are desired. SLABS -ON -GRADE The subgrade soil must be in a firm, non -yielding condition at the time of slab construction or underslab fill placement. Any soft areas encountered should be excavated and replaced with select, imported structural fill. Even where the exposed soils appear dry, water vapor will tend to naturally migrate upward through the soil to the new constructed space above it. All interior slabs -on -grade must be underlain by a capillary break or drainage layer consisting of a minimum 4-inch thickness of gravel or crushed rock that has a fines content (percent passing the No. 200 sieve) of less than 3 percent and a sand content (percent passing the No. 4 sieve) of no more than 10 percent. As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab Structures, proper moisture protection is desirable immediately below any on -grade slab that will be covered by tile, wood, carpet, impermeable floor coverings, or any moisture -sensitive equipment or products. ACI also notes that vapor retarders, such as 6-mil plastic sheeting, are typically used. A vapor retarder is defined as a material with a permeance of less than 0.3 US perms per square foot (psf) per hour, as determined by ASTM E 96. It is possible that concrete admixtures may meet this specification, although the manufacturers of the admixtures should be consulted. Where plastic sheeting is used under slabs, joints should overlap by at least 6 inches and be sealed with adhesive tape. The sheeting should extend to the foundation walls for maximum vapor protection. If no potential for vapor passage through the slab is desired, a vapor barrier should be used. A vapor barrier, as defined by ACI, is a product with a water transmission rate of 0.00 perms per square foot per hour when tested in accordance with ASTM E 96. Reinforced membranes having sealed overlaps can meet this requirement. GEOTECH CONSULTANTS, INC. Vince Borcich JN 08095 October 14, 2008 Page 8 DRAINAGE CONSIDERATIONS Foundation drains should be used where (1) crawl spaces or basementsw.ill be below a structure, (2) a slab is below the outside grade, or (3) the outside grade does not slope downward from a. building. Drains should also be placed at the base of all earth -retaining walls. These drains should be surrounded by at least 6 inches of 1-inch-minus, washed rock and then wrapped in non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or. similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space, and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. A typical drain detail is attached to this report. For the best long-term performance, perforated PVC pipe is recommended for all subsurface drains. The structure includes an elevator, so it may be necessary to provide special drainage or waterproofing measures for the elevator pit. If no seepage into the elevator pit is acceptable, it will be necessary to provide a footing drain and free -draining wall backfill, and the walls should be waterproofed. If the footing drain will be too low to connect to the storm drainage system, then it will likely be necessary to install a pumped sump to discharge the collected water. Alternatively, the elevator pit could be designed to be entirely waterproof; this would include design'ing the pit structure to resist hydrostatic uplift pressures. No groundwater was observed during our field work. If seepage is encountered in an excavation, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps interconnected by shallow connector trenches.at the bottom of the excavation. The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent to the building should slope, away at least 2 percent, except where the area is paved. Surface drains should be provided where necessary to prevent ponding of water behind foundation or retaining walls. GENERAL EARTHWORK AND STRUCTURAL FILL All building and pavement areas should be stripped of surface vegetation, topsoil, organic soil, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill, but they could be used in non-structural areas, such as landscape beds. Structural fill is defined as any fill, including utility backfill, placed under, or close to, a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the lift. The loose lift thickness should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not sufficiently compacted, it can be recompacted before another lift is placed. This eliminates the need to remove the fill to achieve the required compaction. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 9 The following table presents recommended relative compactions for structural fill: Beneath footings, slabs 95% or walkways I Filled slopes and behind 90% retainina walls I 95% for upper 12 inches of Beneath pavements subgrade; 90% below that level Where: Minimum Relative Compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D 1557-91 (Modified Proctor). Structural fill that will be placed in wet weather should consist of a coarse, granular soil with a silt or clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve should be measured from that portion of soil passing the three -quarter -inch sieve. LIMITATIONS The conclusions and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soil and groundwater conditions encountered in the test pits are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil samples in test pits. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures. to attain a properly constructed project. It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of Vince Borcich, Gram Sage Graves, and their representatives, for specific application to this project and site. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. Our services also do not include assessing or minimizing the potential for biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site development. GEOTECH CONSULTANTS, INC. Vince Borcich JN 08095 October 14, 2008 Page 10 ADDITIONAL SERVICES Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractor and its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. During the construction phase, we will provide geotechnical observation and testing services when requested by you or your representatives. Please be aware that we can only document site work we actually observe. It is still the responsibility of your contractor or on -site construction team to verify that our recommendations are being followed, whether we are present at the site or not. The following attachments complete this report: Site Exploration Plan Test Pit Logs Typical Footing Drain Detail We appreciate the opportunity to be of service on this project. If you have any questions, or if we may be of further service, please do not hesitate to contact us. MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. (J IVA L T, I, - EXPIRES I a / p 5L Marc R. McGinnis, P.E. Principal GEOTECH CONSULTANTS, INC. =111 2or 'a 0 E I Solt .k in 9 10 U 11 It \�Ph Rill EL.=92.6 �S Ljj > GAS 9'07-� E conc. wall 4;.99 D =GAS co ve 9 woo ence RENCH MARK, Solt Set a 6' nail 2'hawthor .6 C in north FQCe kD of power pole TP-1 0 i concrete Pad up I Foot. El.- 95.13 c ncrete 0 W 0 a puad Lj b 3� J'cedor 31 u 30 Solt S.F.R. ID 0� HOJO'S #527 0% A CONDOMINIUM Solt wl edor c, TP-2 onc. Set .a 093 stoop oer ol— It 419.7".FF.1't1d c.n,re,, Mr. SA SEWE NITA ' PRIOR SURVEY LOCATED THE INTERSECTION ON KH. A RIM N07 PER 'x' MARKS CRISSCROSS CS L M ON H. RIM. ALSOt FOUND IN 1975'SURVEY FOR X Li ob LAURINTINE CONDOMONIUM. 329.90 --et. S 89'58'14' E 659.79 ORM 7 -.- — STORK IB'Conc.@ le;conc. MAPLE_S)T.�� VL 3nerete curb GEOTECH CONSULTANTS, INC. POINT FALL ON SANITARY SEWER MANHOLE. SET FOUR HAG NAIL STRADDLE POINTS. Legend [a = Approximate Test Pit Location SITE EXPLORATION PLAN 1527 Maple Street Edmonds, Washington Job Date: Plate: 08095 March. 2008 JSNCoatleto Scale I TESTPITLOGS 527 Maple Street Edmonds, Washington TEST PIT 1 0 0-0.5 TOPSOIL 0.5-6.0 Brown, slightly silty, gravelly SAND, medium- to fine-grained, moist, loose (FILL) 6.0-9.0 Old Topsoil over Brown, slightly silty, gravelly SAND, medium- to fine-grained, moist, loose I -becomes medium -dense at 7 feet I U15L r1l Wdb ierMinalea ai a aepin OT U.0 Teet on March ��b, 2uuu. No groundwater seepage wasobserved in the test pit. TEST PIT 2 0-0.5 TOPSOIL 0.5-5.0 Brown, slightly silty, gravelly SAND, medium- to fine-grained, moist, loose -becomes medium -dense at 3 feet j U-5i Pit was ierminmea ai a aepTn OT b.0 Teet on March 28, 2008. No groundwater seepage was observed in the test pit. GEOTECH CONSULTANTS, INC. TEST PIT LOGS 1527 Maple Street Edmonds, Washington _j Job Date: I Scale: Plate: 08095 1 March. 2008 1 Not to Scale I 0 Slope backfill away from foundation. Provide surface drains where necessary. Washed Rocl (7/8" min. size) -M,71 Backfill (See text for requirements) Nonwoven Geotextile Filter Fabric , Tightline Roof Drain (Do not connect to footing drain) Possible Slab Poo 0,0 0*0.0;�*-00*'.".?'do""�-:"'.?'I '" 00* 0 0 0" C) 0 -0 0 0. vapor Retarder/BarHer and Capillary Break/Drainage Layer (Refer to Report text) 4" Perforated Hard PVC Pipe (invert at least 6 inches below slab -or crawl space. Slope to drain to appropriate outfall. Place holes downward.) NOTES: (1) In crawl spaces, provide an outlet drain to prevent buildup of water that bypasses the perimeter footing drains. (2) Refer to report text for additional drainage, waterproofing, and slab considerations. GEOTECH CONSULTAWS, INC. FOOTING DRAIN DETAIL 527 Maple Street Edmonds, Washington Job 8095 1 Date: 00, 1 Scale: Plate: 0 Oct. 2 Not to Scale I $ThIET FILE Return Name & Address �L M 6W 1 e 92 6V. 200811 90266 2 PGS 11 11911 SNOHOM2008 10:10am 00 ISH COUNTY, JSIHIINGTON RESUB NOV 20 2008 NO EXCISE TAX REQUIRED BUILDING DEPARTMENT CITY OF EDMONDS NOV 19 2008 Document Title(s) KIRKE SIEVERS, Snohomisn County TreasuW By KIRKE SIEVERS -77�- 6T�-4as:� e, -� L Reference Number(s) of Related Document(s) Grantor(s) Grantee(s) Additional Reference #'s on Page_ Additional Grantors on Page — vuq C �,-- ;E 6-J*re_.A --� Additional Grantees on Page_7 Legal Description (abbreviated form: ie Lot/Block/Plat or Section/Township/Range) C�+L /)� tj7l 2- oo , Leri- - Assessor's Property Tax Parcel/Account Number OQL0�2-0-- I Q �, I cc) E- -�-- 0 Pj- L- OT �5 2- Complete Legal on Page Additional Parcel #'s. on Page _ The Auditor/Recorder will rely on the information provided on this form. The responsibility for the accuracy of the indexing information is that of the document preparer. C� I am requesting an emergency nonstandard recording for an additional fee as provided in RCW 36.18.010. 1 understand that the recording process requirements may cover up or otherwise obscure some part of the text of the original document. Authorized Signature of Ri3questing Party SARECORDTORMS\Cover sheet -nonstandard. doe TEMPORARY CONSTRUCTION EASEMENT This Agreement, made this day of NA1,e tl,-40-7— — 20 67f , between i aurt . n -1,1 . )? 9 llyt"eowneq N sre c e' I? -tl'o P, , hereinafter designated Grantor, and 527 Maple LLCNince Borcich, hereinafter designated Grantee, does hereby grant unto the Grantee, its successors, assigns, agents, contractors, subcontractors, and employees permission to enter the property described herein: Maple St, Edmonds, WA 98020, and grants the exclusive right to perform construction activities necessary to construct property retaining walls. L QL4AJr;n-t; m e IMArg or 'a-r, a#,, Grantor, does grant to 527 Maple LLC, a Temporary Easement for a reasonable work area, approximately five (5) feet from the existing, adjoining property line, for the purpose of constructing the project retaining walls. The Grantor grants to the Grantee, its successors, assigns, agents, contractors, and employees the right to erect and use construction equipment at the site of the construction herein described. IT IS UNDERSTOOD that the Easement rights herein granted shall terminate one (1) year from the date hereof or upon completion of the above -mentioned construction project, whichever is sooner. IT IS ALSO UNDERSTOOD that the Easement herein granted does not convey any right or interest in the above described property, except as stated herein, nor prevent Grantor from the use of said property; provided, however that such use does not interfere with the rights herein granted. In addition, the Grantee, its successors, assigns, agents, contractors, and employees agree to the following conditions of entry: DAMAGE TO PROPERTY: Shall exercise care to avoid damaging the property in any manner not consistent with the purpose for which this agreement is issued. 2. COOPERATION WITH GRANTOR: Shall at all times cooperate with Grantor(s) and comply with reasonable requests not inconsistent with the purpose for which this agreement is issued. 3. C LEANUP: Shall spread material uniformly over the construction site, seed, and fertilize.'Upon completion of the retaining walls, shall clean all the ground occupied of all rubbish, excess material, temporary structures, and equipment. 4. ACCEPTANCE: All parts of the retaining wall shall be left in acceptable condition. G tee Grantor #. t;V�rtz'q Z7 12,11— /Title M-Y— Date Gr t 'sPrintedName Pre � 7n or e 4 e s,? t4 r; kr-t; &-1 e Alorn e 4" "T 4sso C Date CITY OF EDMONDS K? '�\*AFFIC IMPACT ANAL WORKSHEET Name of Proposed Project: '12 V1 A�� LE, Owner/Applicant: \-, A 1?;;Ib Name ' T. 0 - Vos. Street/Maihng Address ET-�,11 city State zip Telephone: "Z.D Co - A I I- - --19 �z I Applicant Contact Person: , IC9: Name S I c(ok t -I U� Street/Mailing Address 4—:: 0 t-t C.'i L-'-s Z. Co city State zip Telephone: A Z-F5 -7 6 Traffic Engineer who.prepared the Traffic Impact Analysis: Firrn Name I - PROJECT DESCRIPTION a. Street address (ifknown): Contact Name Telephone b. Location: It d &P 1 .5 1717E-- 7��44—oyj 4=44 - ? (Attach a vicinity map and site plan.) c. Specify existing land use: V-Y-iS7r11,-3&, S'FIL I d. Specify proposed type and size of development: tJ1E-J I #J 1-r ef--eAj Lh e. When will the project begin construction a*nd when will it be completed? LJ4W f. Define proposed access locations: AAi"1Ur— g. . Define proposed sight distance at site egress locations: �.J I L-L_ t:j K-V,7r c 1131 eo D(.ST-AvP-� -ex-m-43% Rr AA t #E82 city of edmonds development information TRAFFIC IMPACT ANALYSIS REQUIREMENTS This handout applies to all development activity. "Development activity" means any construction, expansion, or change in the us _e of a building or structure that creates additional demand and need for.public facilities. Thes& requirements are to be utilized in developing traffic - impact analysis. This'handout outlines the traffic impact analysis requirements based on trip generation thresholds. All applications for'development activity projects whi I ch require review must comply with the requirements outtined in the City of Edmonds Traffic Impact Analysis checklist below. Complete the attachedTraffic Impact Analysis Worksheet or prepare a traffic impact analysis report that complies with"and addresses the City of Edmonds Traffic Impact Analysis Checklist., Please note that reqiiiked traffic impact fees shall be in accordance with Chapter 18.82 Traffic Impact Fees of the Edmonds Community Development Code (ECDC). The City shall collect impact fees, based on the rates in ECDC 18.82.120, from any applicant seeking development approval from the City for any development activity Avithmi the City, where such development activity requires the issuance of a building permit. Thisshall include, but'is not limited to, the development of residential, commercial, retail, office, and industrial land, and includes the expansion of existing uses that creates a demand -for additional public facilities, as well as a change in existing use that creates a demand for additional public l."acilities. Impact fees shall be assessed based upon the road impact fee rates in affect at the time an application is deemed complete by the Development Services Department for an ADB design review approval, conditional use permit, change of use permit, PRD, plat, short plat, remodel permit or building permit, which ever occurs first for a development project. Impact fees shall be paid at the time the change of use permit, remodel permit or building permil: is issued by the City, and the permit shall not be issued until the fee is paid. For a change in use of an existing building or dwelling unit, including any alteration, expansion, replacement or new accessory building, the impact fee shall be the applicable impact fee for the land use category of the new use, less any impact fee previously paid for thc land use category of the prior use. If no impact fee was paid for the prior use, the impact fee for the new use shall be reduced by an amount equal to the current impact fee rate for the prior use. The assessed impact fee must be paid prior to the issuance of any building permits. The following are examples of types of projects that do not increase the number of residential units or commercial or'other activity using the roadway system and, thcrefore, do not create additional demand on the roadway system. Traffic Impact Fees cannot be ri,-quired as a condition of development approval for these types of projects. (See ECDC 18.82.040, Exemptions.) These types of projects do not require completion of the Traffic Impact Analysis Work Sheet or Traffic Impact Analysis Report. Rcm�d 9i30/2004 S:\ENGRUiANDOUTS\TraflmpacLAmly,sisRequire E82_9-04.doc 2. TRIP GENERATION a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: pa up, I 3. TRIP DISTRIBUTION Prepare and attach a graphic showing project trip distribution percentages and assignments. 4. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY a. Have sight distance requirements at egress location been met per AASHTO �requirements? b. Intersection Level of Service Analysis:, • Existing Conditions LOS Delays • Year of Opening LOS Delays • Five Years Beyond Change of Land Use LOS Delays (Intersections to be evaluated shall be determined by the City ofEdmonds Traffic Engineer.) c. Describe channelization warrants: (Attach stripingplan.) d. Vehicle Storage/Queuing Analysis (calculate 50% and 95 % queuing length,,.,): 50% 95% Existing Conditions Year of Opening Five Years Beyond Change of Land Use e. If appropriate, state stop sign and signal warrants: f. Summarize local accident history: 5. TRAFFIC VOLUMES a. Describe existing ADT and peak -hour counts, including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak- I hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been ful-ly open (with and v6thout project traffic). d. State annual background traffic growth factor and source: 6. LEVEL OF SERVICE ANALYSIS Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for -each arterial street or arterial intersection impacted by ten or more peak - hour trips. Other City -planned developments must also be factored into the LOS calculations. Existing LOS: Existing Condition: Year of Ovenine LOS: With Project: Without Project: Paae. 4 Five Years After Opening LOS: With Project: - Without Project: Note any assumptions/variations to standard analysis default values and justifications: 7. NUTIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4. (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. tJ IT-S Y- (O-L =."7 1. f�� 414 - s4 M I ri A'.'M Ov%- t iv sis - 40-2A / wl� 141-2:72 4( S$;g r,>rMo W 1 �n 9� u lvi, Ilk. ..... �k A "?, mtll _'Iff - �T�t . , WF Kilo ;,Zl ­A-AAl 47 Z 7P',- J.. J , W pe �a v, , , .1 ; ;t. = - Alder6t U10 j7 AL ill tall 4 3/4 54'-6" wv�= is wn OW IT - -- .. 0 9-4 W-W-W-40-w- KIC FEN r MINIMMON, --- MUNI ENO N 00*0 527 Mapl Edmonds, WA PROPOSED SITE PLAN SCALE: 1"= 10'-0" 4/2/07 tgbataylor gregory butterfield architects I Drainage Report & Calculations FOR Borcich Multi -family Residence 527 Maple Street Edmonds, WA 98020 rAo' M14,114 1 2 '5 ,,Jog EXPIRES 9/5/ CG Engineering Project No. 07240.20 November 21, 2007 Revised February 15, 2008 = 4M ENGINEERING 250 4h Avenue S, Suite 200 Edmonds, WA 98020 (425) 778-8500 - t4r*q RFCFIVF-D iu% 1 6 7008 BUILDING DEPT* FILE Drainage Report & Calculations = 4m; r:NG1N_Er=R1NG PROJECT OVERVIEW: The project is located at 527 Maple Street in Edmonds, WA. The project site consists of a rectangular shaped parcel, 5 0 ft. x I 10 ft., encompassing approximately 0. 13 acres. Development will consist of a new multi -family condominium block to replace the existing single family home that currently occupies the property. A vicinity map, aerial photos, contour map and site photographs are included in this report. EXISTING CONDITIONS: The existing site is fronted on the south by Maple Street which slopes from east to west toward Puget Sound at approximately 8.5 to 10%. A house and detached garage currently occupy the site. The impervious areas, which constitute the buildings, existing sidewalks, driveway and retaining walls, represent 2300 sq. ft. or 0.053 acres. The remaining 3200 sq. ft. or 0.075 acres represent pervious or grassed areas. The site is bounded on the east and on the west by residential units. On the south, the property is bounded by Maple Street and on the north by a paved alleyway. Single family and multi -family residences are located on the opposite sides of these paved roadways. See site photos in this report for more information. A soil survey conducted by the Natural Resources Conservation Service indicates that the soil type is classified as Everett, Type A, which is a gravelly -sandy loam with typical slopes of 15 to 20 percent and is rated to be somewhat excessively drained. DEVELOPED CONDITIONS: The developed site will include a new multi -family condominium block to replace the existing structures on the property. The new building, which will7have three levels, including ground level parking, will cover an area of approximately 2030 sq. ft. The driveway, additional parking, walks and retaining walls will cover an area of approximately 1920 sq. ft. Total impervious surfaces on the site will consist of 3950 sq. ft. or 0.09 acres. The remaining area of 1550 sq. ft. or 0.04 acres will be permeable grassed surfaces. It was decided that a. storm drainage detention system would be the most cost effective and practical method of controlling storm water runoff. Storm drainage will be collected on the property, via a system of roof drains, a trench drain and surface drainage. This runoff is sent to catch basins located on the north side of the property as shown on the grading and drainage plan. These catch basins are connected together by a 24 in. diameter HDPE pipe which is 32 lineal ft. in length. This pipe temporarily holds and releases storm water runoff at a controlled rate. This detention system will be located under the rear parking area on the north side of the proposed condominium, approximately 10 ft. from the building and 5 ft. from the north property line. The detention system is sized according the City of Edmonds Storm Water Management Standards. See attached Design Tables. Sizing is based on the square footage of impervious area that will be located on the subject property. Using an impervious area of CG Engineering — Project 07218.20 - Drainage Report for Borcich Multi -family Residence Page 2 Drainage Report & Calculations lel— C�'_ ENG[Pi�ERING 3950 sq. ft., 100 cubic ft. of storm drainage runoff volume will be stored and released at a rate that is less than or equal to the pre -developed conditions of the subject property. A flow control structure will insure that detained storm water will be released in a controlled manner. The detained storm water is then released to an existing catch basin which is connected to the city's storm drainage system. See attached Grading and Drainage Plan for a detained layout of the detention system. OFFSITE ANALYSIS: The project site is located along Maple Street that is on an east -west slope within the city limits of Edmonds, WA. The area is residential in zoning and is fully built out. Although there are several areas uphill of the site, upstream drainage areas will not enter the site because all upstream development has storm drainage systems that collect and transport storm water runoff to the existing city storm drainage system. EROSION AND SEDIMENT CONTROL: Clearing limits are delineated on the final engineering plans and will be flagged in the field prior to the start of construction. A filter fabric fence will be installed around the entire downhill perimeter of the site along the property lines. The filter fabric fence will be checked periodically during the wet season. It will be inspected during and after any heavy rainfall. Damage will be repaired prior to leaving the site. The fence shall be removed within 30 days after the site has been stabilized. Any disturbed areas resulting from construction or removal of the erosion control measure shall be stabilized. If possible, the clearing and land alteration work will be scheduled in the dry season. Trapped sediment will be removed or stabilized on site. A gravel construction entrance will be placed on Maple Street prior to any clearing for the new residence to minimize truck tire soil tracking. If construction vehicles transport soil and/or debris onto road surfaces, the roads shall be cleaned thoroughly at the end of the day. Sediment shall be removed by shoveling and sweeping and transported to a controlled sediment disposal area. Street washing shall be allowed only after sediment is removed in this manner. Existing storm drain catch basins downstream of the site shall be protected by means of a filter fabric insert which will be sandwiched in between the grated inlet and the catch basin frame. This will prevent the introduction of sediments or pollutants into the city storm drainage system that may have escaped the site. The catch basins shall be checked periodically and cleaned as needed at the direction of the project engineer or City of Edmonds Public Works Department. CG Engineering — Project 07218.20 - Drainage Report for Borcich Multi -family Residence Page 3 Drainage Report & Calculations = C�'_ ENG114-EERING Attachments • Vicinity Map • Aerial Photograph • Contour Map(I "=200') • Site Photographs • Detention Sizing Tables and Detention System Worksheet 0 Construction Plans CG Engineering — Project 07218.20 - Drainage Report for Borcich Multi -family Residence Page 4 M Id . 0 J* -tt_ �d, ------- AIR.— Wi'i­aw AV M Id M AV AV HIPR __j m A H I d Hi4 AY Him I Id' 19 W,',w __ iin J AV 1,90, jil: Id 1'�16�­X- _y. Id I AV. A . V Z6 24 �, NK s , I �vr�,, obj! 14; 1 MIMI AV f;j I 3idwAin ti 9 4 t V t . err AV X_ 1 tch 07 2t wir I., A Ij CIS AV 486 J, IS AV 'iiv 1 0 H105 AY LIM AV Uj AV r AV CL j _.m I _A� Sig VZ, ?­X AV AV AV AM NONO, L '15�> Q. ­1 � -2 Im > 4-j il A -If 4 'Nkh V� "IV, MA zc =,-Zz N.j Lc. w 11 0 . j4,i.5 SAX, LA "I till Pi a r:7. ul wr T,� "VI r4jj J., , 4NMW r /-� KI, —In 1 1;2 m A p NW. Al M V, JIG ------------- ev, a �4 J-1 Sc. NA LTable 1 -- Detention Pipe Sizes Impervious Surface Required Pipe Diameter Area Sq. Ft. Vol Cu Ft 15" 18" 24" 30" 2000 50 40 28 16 10 2500 62 50 35 20 13 3000 75 60 42 24 15 Required pipe 3500 87 70 49 28 18 length in feet 4000 100 80 56 1321 21 4500 112 90 63 36N� 23 5000 125 100 70 40 25 30-Q; uwkco ?wj�&YA'66 Im *NOTE: Use the next highest surface area to determine detention size if cal I=ted pervious surface area is greater than 1/2 the value between numbers. (i.e., 2280 use 2500) I Table 2 -- Outlet Orifice Sizes Impervious Surface Area Sq. Ft. Outlet Orifice Diameter (Inches) 2000-2999 5/8 3000-3999 3/4 V 4000-5000 7/8 Table 3 -- Rectangular Catch Basin Requirements Detention Max. Size Catch Basin. pipe diameter knockout Type < 18" 20" Type 1, CB 15 18" to 24" 26" Type IL, C13 16 CArth $Az,',u SfiVAA66­72,540 24" to 36" 36" Type 11, CB 19 19 (48" Basin) 36" to 42" 42" Type 11, CB 19 19 (54" Basin) -Cb'rlq &6� �09466 ?0 *Source: Assoc. Sand & Gravel Co. Standards ALLLOWABLE STORM DRAINAGE DETENTION OR CONVEYANCE MATERIALS: • Reinforced Concrete (right-of-way) • Non -reinforced Concrete (non -right-of-way) • Aluminized Steel • Aluminum 16 GA or better • CMP Asphalt Coated • N-1 2 ADS HDPE (Min. 2' cover required under paved areas) water tight • PVC-SDR 35, ASTMD-3034- or better • Ribb . ed-F-VC pipe, ASTM-D-2444 Ducticle iron pipe Class 50 - Tightlines system: • N-12 ADS (Smooth Wall) • PVC-SDR 35, ASTMD-3034, or better • Hancor F-810 S:\ENGR\HANDOUTS\Drainage tables E21 STANDARD DETENTION SYSTEM'WORKSHEET (5000 SF OR LESS) CALC. BY: C114915, A. AA2,Qf-:—AScA-) ADDRESS: PHONE: 4-'ZS--77S - ssc�4c> OWNER: vlpe—C-A-7-r 5-7 414ft-- -5-Q, &PAdQ)t,)DI� L qJ DATE: -z+ I/ .3.a y il IMPERVIOUS SUFACE AREA 50 PIPE DIA. — I PIPE LENGTH ORIFICE :t RIM ELEV. FINISHED GRADE TIGHTLIN FOOTING DRAINS SHALL NOT UPPER CATCH BASIN i DETENTION PIPE LENGTH 0,5%TO1-0%SLOPE V. ELEV. —qQ, —5-2— CONTROLCB BE CONNECTED TO -LOCKING LID (TYP.) IM ELEV 93A--t F 6' min. clearance Measured from top of /1/F Cone. box or riser. DETENTION SYSTEM TO CITY CONVEYANC;r ELEV. 90, ZO 9.1 CONTROL YIIN. '*�'�RIFICE ,�-' 0-2 1,--7 rXIM QL . INV. ELEV. 90-0 '2'X2'X12" DEEP I CONTROL CATCH BASIN ;(4"-6" QUARRY SPALLS OR EQUAL) IN. 6'"'COVER FROM CONTROL�CB--����. CONTROLCEI $HALL BE PERPENDICULAR 1.5' TO SPREADER TRENCH ::�k5 TRENCH SHALL BE LINED WITH MIRAF1 &ON TOP PERF. PIPE SHALL BE LEVEL & CAPPED AT ENDS RIPRAP OUTLET 7/8" WASHED DRAIN ROCK I SPREADERTRENCH NOTES 1. CALL ENGINEERING DIVISION (771-0220 EXT. 1326) 24 HOURS IN ADVANCE FOR A TIGHTLINE AND DETENTION SYSTEM INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS. 2, Responsibility , for operation and maintenance of drainage systems on private property.is the responsibility of the property owner. Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times, CITY STORM CONVEYANCE SYSTEM -SPREADER TRENCH SHALL BE AMIN. OF 10'LONG AND PERPENDICULAR TO CONTROL CB. .......... SW 1/4, SECTION 24, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. BORCICH MULTI -FAMILY RES-IDENCE 527 MAPLE ST. EDMONDS, WA 98020 OWNER CONSULTANTS VINCENT BORCICH ARCHITECT aVIL ENGINEER 527 MAPLE ST. TAYLOR GREGORY BUTTERFIELD DO ENGINEERING EDMONDS, INA 98020 21911 78TH AVE W.. SUITE 210 250 4TH AVE S., SUITE 2DD EDMONDS. WA 98026 EDWOM WA 98020 425.788.15M FAX 425.774,780 425.778.11500 FAX 77&5536 CONTACT: JOE MOLINA CONTACT. CHRIS ANDERSON CITY OF EDMONDS GENERAL NOTES GENERAL NOTES: 1. ALL MATERIALS AM WORK SiM ON THEA PLANS SiALL CONFORM TO THE CITY OF MOW STANDARDS. RE FOLLOWING SPECIFICATIONS AND OCIDES. AND ALL OTHER APPLICABLE LOCAL MUNICIPAL. STATE AM FEDERAL CDOE!, :amw 0111ON IBC CIRREKT EDITION WSDC)T/APWA STANDARD SPEaRCATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION -WA"GTON STATE DEPARTMENT OF ECOLOGY STONWATER MANAGEMENT MANUAL FOR THE RJCET SOUND BASIN (MOW EDMON) I STANDARD PLAN AND TYPE NUMBERS WATED ON THESE DRAWINGS RITER TO WSCOT STANDARD RAMS FOR ROAD. BRIDGE AND MUMCIPAL CONSTRUCTION. i A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSTE VialIVER CONSERIXTION IS IN PROGRESS C DEVIATIONS FROM THESE PLANS MST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5, CONTRACTOR SHALL RECORD ALL APPROVED DEMATIONS FROM THESE KARS ON A SET OF DRAWINGS AND SHALL SIMARCZE All AS-EXTILT CONDITIONS ON ONE SET OF REPRODAICELE DRATOM FOR SUBMITTAL TO THE 0*0 PRIOR M PROJECT CDWETION AND ACCEPTANCE. 6. ELEVATIONS SHOWN AM IN FEET. SEE SURVEY FOR BENCHMARK KMA70 Z THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN Remo BY OTHERS By FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND MILE, THEREFORE BE MISIDERED APPROXIMATE ONLY AND NOT Wff-%AKY COMPLETE IT IS K SOLE RESPCNSIBUTY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY Of ALL U11UTY LOCATENS SHOWN AND TO MOO WCOM AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED By THE RIPUMENTATION OF THIS RM. CONTRACTOR SHALL VMFY LOCATION. DEPTK M TYPE AND MOTION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSNC POINTS BUTORE TWICHUIG FOR NEW URITIES. CC ENGINEERING ASSUMES NO FOR THE COMPLE70NESS OR ACCURACY OF THE DIISIING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWING& IT. CONTRACTOR SHALL LOCATE AND PROTECT ALL UIIUTIES DURING CONSTRUCDON AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SUM (1-&DD-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL MOMM AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OMIERS REPRESENTATIVE OF MY DISCREPANCIES 10. PIPE LENGTHS NHIX SHOWN ARE APPROXIMATE AND MAY CHANCE DUE TO FIELD CONDITIONS 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICk REPORT (WHERE APPucAmo AND RIALL THOROUGHLY FAMILIARIZE HIMSELF NTH THE CONTENTS THIREOF ALL STE WORK SHALL BE PERFUNED IN STRICT COMPLIANCE WITH THE RECMENDATIONS OF THIS REPICIRT. IZ STRUCTURAL FILL MATERIAL AND RACBIENT SHALL CONFIRM TO THE RECOMMMADONS OF TIE MELT GEOTECHNICAL REPORT li MMHl= CATCH BASK UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURA. FILL IF SOL IS DISTURBED. SOFT. LOOSE. NET OR IF ORGAMC MATERIAL 5 PRESENT AT SUBGRACE ORATION. REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER CEOTECHNICAL REPORT. It SEE SLIRIV AND ARaflECR)RAL DRAUNGS FOR DWENSMNS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING STE FEATURES. I& SEE ARCHTIECTURAL DRAWINGS FOR PDRIMM FWWA70 DRAN& FOUNDATION DBMS 91ALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHILINED TO THE STORM MAN SYSTEM WHERE INDICATED ON THE PLAN& III All REQUIRED STDRWWAIER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY MUM UNLESS OTHERWISE 17. ALL ROOF DRAINS, PERNETER FOUNDATION NAM CATCH BARNS AND DIM EXIEINAL DRAINS RALL BE CONNECTED TO BE STORM DRAINAGE SYSTEM. NO FOOTING AND SUBFLOOR DRAINS RiALL BE CONNECTED M DETENTION SYSTEM. I& CONTRACTOR 91ALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL STE IMPROVEMENTS INDICATED ON TWA DRANNGS. 19. AS A MINIMUM REQUIREME117. ALL DISTURBED AIM ON AND OFF SITE SHALL BE REMO TO THE EQUIVALENT OF THEIR PRECONSTRuCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 2D. ALL DISTURBED SOIL WAS SHALL BE OR STAMM BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF CN-SITE EROSION AIM THE COMPLETION OF CONSTRUCTION. SEE MORON CONTROL PLANS FOR SPECIFIC GRADING AND GROSON CONTROL RECUMENTS. 21- THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CEAN AT ALL TUB BY SWEIRNG. WASHING OF THEM STREETS VILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL LEGAL DESCRIPTION LOT 31 AND THE EAST 20 FEET OF LOT 3Z MOCIC 121. CITY OF EDMDM ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 2 OF PLATS, PACE 39 ' RECORDS OF SNOHOMISH COUNTY. WASHINGTON. BENCHMARK EDMONDS 'R* 04 MULLER ON TOP OF A FIRE HYDRANT At S ' W. CORNER OF 4TH AVE. S. AND DAYTON ST ELEVATION = 61.35 22. THIS PROJECT IS NOT A BALANCED EARIHWORK PROJECT 80TH EXPORT AND IMPORT OF SaL AND ROCK MATMALS ARE REQUIRED. 21 SLOPE OF FD490 GRADE %AU. BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS 94DW 2C FINIIM GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MNIMUM 5% SLOPE FOR A kfiNNUM DISTANCE OF 10 FEET. 25. CONTRACTOR SHALL BE RESPONSIBLE FOR AND RJALL INSTALL AND MAINTAIN SNORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS. STREETS, WAIXWAM UTTUTES AND OTHER EXISTING AND PROPOSED WROVD07S AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EWBANKMDM CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF giORING AND BRACIK AS REQUIRED. 26. CDCRECIATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS ANDJOR Sam INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY WARIES. OWECTIONS To EXISTING UTILITIES SHALL BE MADE ONLY WIN RE WRITTEN APPROVAL OF THE AUTHORITIES COVETINING _77 EXISTING UTILITY LINES IN SERVO 1HICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOWS EXPENSE. 21L NEW UTILITY LOCATIONS ARE GENERALLY WN BY ONENSICI( WHERE No DIMENSIONS ARE DOCATM LOCATIONS MAY BE SCALED FROM DRAWINGS FIELD ADJUSTIOTS WALL BE APPROVED BY OWNEER's REPRESENTATIVE. 29. WHIX NEW PIPE afm AN EXISTING OR NEW UTILITY BY 6- OR LESS. PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES 30. SEE MECTIMICAL DRANNGS (WHERE APPUCAEILE) FOR CONTINUATION OF STE UTILITIES WITHIN THE BULDRa 31. SEE ELECTRICAL DRAWINGS (WHfRE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK V_ 91 LANDRIAPE DRAWDICS (WHERE APPLICABLE) FOR RE IRRIGATION SYSTEM. 31 STREET ODSUTES WILL NOT BE PERMITTED. CONTRACTOR Slia PROVIDE PROPER TRAFFIC CONTROL To INSURE TRAFFIC FLOW IN AND AROUND THE INTERSECTION. THE CONTRACTOR SHALL REQUEST ANY STREET CLOSURE IN WRITING TO TW CITY ENGINEER. ONE WEEK PRIOR TO THE EFFECTIVE DATE. CLOSURE OF THE STREET %ALL BE TEMPORARY IN NATURE AND THE CONTRACTOR SHALL OCORDINATE NTH TIEHEB DEVELMERS IN THE AREk WHO MAY BE USING 1W STREET FOR A CONSTRUCTION ACCESS. IF APPROVAL IS OVER TO TEMPORARILY CLOSE N STREET. THE CONTRACTOR SHALL POST MRS AID NOTIFY THE ADJACENT NEIGHBORS IN ADAMCE OF ANY CLOSURE 34L THE CONTRACTOR SHALL BE RESPONSEILE TO WINNE DUST OlEATED BY CONSTRUCTION AND MAINTAIN DEVICES ANDtR PROCEDURE TO REDUCE DUST UNTIL THE WORK IS COMPLEM oi� DATUM NAVD 88 SHEET INDEX C1.1 COVER SHEET & GENERAL NOTES C2.1 TEMPORARY EROSION CONTROL PLAN C2.2 TEMPORARY EROSION CONTROL DETAILS C3.1 GRADING & DRAINAGE PLAN IC4.1 WATER & SEWER PLAN 1. ALL STORM SEWER PIPE SHALL CONFORM NTH CURRENT EDITION OF WSDOTS STANDARD SPECIFICATIONS FOR ROAD. BRIDGE AND MUNICIPAL CONSTRUCTION AND M OTY STANDARM Z ALL PIPE SHALL BE RACED ON STABLE EARTH. OR COMPACIED GRAVEL W,',-.MAL I RACKFILL !HALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE OR PiPE-AROi IN LAYERS WIN A LOOSE AVERAGE DEPTH OF fi-, MAXIMUM DEPTH 9% THOROUGHLY TAMPING EACH LAYER. COMPACTED LAYERS MUST EXTEIID FOR ONE DIMETER ON EACH SIDE OF CHE PIPE OR To THE SIDE OF THE TRINot (TUB TO WSCHOT STANDARD SPECIFCATION 7-04.X3) AND STANDARD SPECIFICATION 2-a3-Xl4)C. METHOD a & C. 4. SACKIFILL AROUND PIPE MUST BE CIWACTED 10 A SPECIFIED AASITO T-�i DMTY OF SOX USE REASONABLE CARE IN HANDLING AND INSTALLATION. 5 ALL DRAINAGE PIPE ODLPJNC� TIMM. ADAPTERS & APPURTMANCES SIALL BE SPECIFICALLY DESIGNED FOR THE INSTALLED PIPE AND SHALL BE INSTALLED PER MANIFACIURfS RECOMMENDATION& 6. ALL CATCH BASINS %ALL HAVE tDOW UX L ALL CATCH BARNS SHALL BE TYPE I MESS OTHERWISE NOTED. I ALL CATCH BASINS NTH A DEPTH OVER 5,0 FEET TO THE FLOW LINE SHALL BE A TYPE 0 CEI OR LARGER (MANHOLEI I THE CONTRACTOR SHALL BE RESPMSIBUE FOR ADJUSTING ALL MANHOLE. ILET, AND CATCH BASIN FRAMES AND GRATES PER CITY STANDARDS JUST PRIOR TO POURING OF CUM AND PAVING. 4. ALL GRATES SHALL BE DEPRESSED 0.1 FEET BELOW PAVEMENT LEVEL 5- ALL TYPE I CATCH BASIN MANHOLES, WT. AND CATCH BASINS SHALL HKOE LOCKING UDS. 6. STANDARD LADDER STEPS SHALL BE PROMDED IN ALL CATCH BASINS AND MANHOLES EXCEEDING 5 FEE] IN DEPTH. 7. ALL CATCH BASINS WITHN THE CITY ROT -OF -WAY SHALL BE LOCKING VANED GRATES VICINITY MAP NTS LEGEND DESCRLP'nON -DOSTING PROPOSED PROPERTY LINE ADJACENT PROPERTY LINE CENTERUNE CLEARING LIMITS SEDIMENT BARRIER X_ x CONTOUR LINE -100- -Too- FENCE _0 ------ 0__ n_ cl_� SANITARY SEWER UNE _ss- _ss� -ss-ss- MANHOLE Q STORM DRAIN WAIN -SD - - - - SO- -SD-SD- STORM DRAIN PIPE - - - - - - - - - - ROOF DRAIN - - - - - - - R - -R FOOTING DRAIN F - F - -F -F PRESSURE LINE p - P_ P CATCH BASIN (TYPE 1) 0 IN CATCH BASIN (TYPE 2) @ a-EANOUT MWOUT AND WYE GRADE BREAK - - - - - - - - - - - - - - SURFACE SWALE DRAINAGE ARROW WATER LINE o - - - W� WATER METER IS 12 FIRE HYDRANT FM PIV 0 0 GATE VALVE 9 x TEE 90' SEND THRUST BLOCKING CAP CONCRETE PAVEMENT 1 ASPHALT PAVEMENT CRUSHED SURFACING w. 777777 ROOKERY SPOT ELEVATION ,20.0 20LO TELEPHONE LIKE T - T - - T - -T-T- POWER LINE E - - - E - - - E - -E-E CASE LINE C - - - C - - - G- -0-G SIGN 4= 0-CM ENGINEERING 250 4TH AVE. S.. SUITE 200 EDMONDS. WASHINGTON 9a02O PHONE (425) 778-8500 FAX (425) 778-5536 .�c DESIGN: CRA DRAWN: JRP CHECK- RMS JOB NO: 07240.20 DATE: 11 /07/07 Ld 0 z Ld m V) Ld m 0 04 0 00 _j v; La _j 0- z 0 cx M 0 04 0 m Lf) LLI SHEET: Stri, LL] Lu 0 LLI LLI Lij > z 0 LLJ C) 0 THESE PLANS HAVE BEEN PREPARED FOR AGENCY REVIEW AND ARE SUBJECT TO CHANCE. DO NOT USE FOR CONSTRUCTION OR BIDDING PURPOSES WITHOUT SIGNED AGENCY APPROVAL STAMP. CALL BEFORE YOU DIG 1-800-424-5555. cil power �Qult .�4phoft dley GAS I F"d RNA i. bor LS4681 i. Pair — SW 1/4, SECTION 24, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. i IA asphalt 99� _____.SPhdI alu GAS GAS 2�j -SO— GAS 49 99 =L wall power N CAICH BASIN p o I 7e 9S -ad f— RIM EL= 91.96 RENCH MARK SET A S' NAIL IN NORTH sol FACE (IF POWER POLE REMOVE DOSTING UP I FOOT. EL= 95.13 12'hnth­ WOOD FENCE Pact REMOVE ALL E)OSTING BUILDINGS, STAIRS. & ALL DOI PADS & DRIWWAYS OWR- I HANG 0 8'��d .1 THE ... S.F.R. cl� HOJO'S A LAURKNE A 1527 CONDOMINIUM CONDOMINIUM I I ,--INSTALL STABILIZED CONSTRUCTION ENTRANCE PER DETAIL INSTALL FILTER CLEARING LIMITS FABRIC FENCE PER PETAI L REMOVE Ek STAIRS & SIDEWALK REMOVE �X REMOVE DOSTING RI Cl(ERY ROOKERY AS NEEDED 8 Sd tk/lecd i� color 19567 at c� REMOVE ALL EX 4 foot dfnt. TREES (3) 0­94.71 —REMOVE DL Bwch mark. 30CI 00 INSTALL CATCH BASIN lockary SEDIMENT PROTECTION I CATCH BASIN S't ..9 nd m IBM EL= 7 k 89.9 load at 4 foot offtel. Elm,= 98.88 --t, -b -SS- -SS- -SS- _SS_ 4 _SS_ -IS- 4_SS_I� - ss_�� '�r _SS_ S� 4 �LSS _S TSS_ _SS_ Ss_ 4 093 _.'W P. pl-� �s .5� S_ _sS_ 4 - -SS- 4 - -SS- -SS -W ack in SANITARY lead 0.05 .,t SEWER MANHOLE at 9.77 offwL R.O.S. 9.75 RIM EL=99.27 .sphdi top of cA. 329.9D S 89VIC E 659,79 -SD- -SA' 4- --4 -".-4SD- 4 - -SD- C_ -SD- -SD- 4 - -Sa- -SD 93.2 93.2 -SD- -SD- 4 - -SD- -SD- _SD_ 4 - _SD_ -SD4.0),— -SO- 4 - -SD- -SD- 4 - -SD- 4 - -SD- -SD- --SD— CATCH BASIN lg,—. I law GRAIN MANHOLE EL=89.41 Pill EL=99.02 -*A - - - IA - - - IA - - - WA - - - VIA - - - WA - - - WA - - - WA- - - WA - - - WA - - - WA - - - WA- - - W�- - - WA - - - WA - - - WA - - - ft- - - W� - - - WA - - - WA - - - *A - - - WA- - - WA-WA - - - WA - - - *A - - - WA TTEMPORARY EROSION CONTROL PLAN SCALE. 1" = 10' 10 0 5 'D eNGINF-eRING 250 4TH AVE. S., SUITE 200 EDMONDS. WASHINGTON 95020 PHONE (425) 778-85DO FAX (425) 778-5536 DESIGN: CRA DRAWN: JRP CHECK: RMS JOB No� 07240.20 DATE: 11/07/07 Ld 0 z Ld 2 W Ld :2-r 0 V) C4 0 < 0 W z 00 LLJ IV-) >- CL 0:f La _j _j vi CL 0 x: a Z 0 CL 0 0 M r-, :2 LLJ 0 [vig 0 c,4 a M to LLJ (_) SHEET C2.1 THESE PLANS HAVE BEEN PREPARED FOR AGENCY REMEW AND ARE SUBJECT TO CHANCE. DO NOT USE FOR CONSTRUCTION OR BIDDING PURPOSES WITHOUT SIGNED AGENCY APP-ROVAL STAMP.- CALL BEFORE YOU DIG 1-800-424-5555 FFILTER FABRI�___ SECURED TO . 2- 14 GA. WIRE FABRIC EQUAL 2' X Z' WOOD OR EQUIVALENT-\ PLACE 3/4'-L5' WASHED GRAVEL IN THE I.. AND ON I. SIDES OF l.TER FABRIC FENCE ON THE SURFACE. FILTER FABRIC MATERIAL IN CONTIMOUS ROLLS ' USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO VIRE. VVIRE: MESH SUPPORT FEVIfE I a S . SUPPORT FILTER FA?jlC. -I T-C - - - - Tl- I �;l BUTT.; ; IF LTER if MATERIAL 8' TO 2! L'\2' )( I- W..D POSTS OR U EQUIVALENT CONTRACTER/DEVELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OT14ER WORK CAN BEGIN. C'4T_� DETAIL FILTER FASPJC FENCE FIL TRAIN SYSTEMS Ll o. I ' _.. I— ;; r' - Ell SW 1/4, SECTION 24, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. PP"AVAVAM -25' MIN. RADIUS 'f AVA V A, A T V V A V WTAVATAVAVAT _ QUARRY SPAI_e�- AVAVAI 1 2-4. MIN DIA 1,556nowdown, V V V 5 V 9­12' KIN. DEPTH 55 X �, z -</ - PROVIDE FULL WIDTH OF INGRESS/ EGRESS AREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CONSTRUCTION PERIOD. I IT NSPECT .... REQUIRED ON ALL EROSION CONTRI r C. r AS UR _ S BEFORE WORK CAN BEGIN. D ONO M. v_: REVISIONS STANDARD DETAIL I, I _ L GEBMT STASUM CONSTRX110H EN11LANCE I o� I— -s r- - El_� ,,GRATE _-9,2 ILTE ER F CATCH BASIN STRAW BALES MAY RE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL EI.I.D. THIS APPLICAITON SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCITON PERIOD. CITY INSPECTION REQUIRED ON ALL EROSION CONTRI MEASURES BEFORE WORK CAN BEGIN. REVISIONS STANDARD DETAIL A CiE 1 10/ 03 W21 D. GEBE TRAP FOR CATCH BM & GEKRT 112.1M I— TS t—,'N_CITY OF EDMONDS STD. DETAIL E1.1 r,\ CITY OF EDMONDS STD. DETAIL E11.2 (-x-'\ CITY OF _EDMONDS STD. DETAIL E1.3 SCALE: NTS SCALE: NTS ' 4m ENGINICEEERING 250 4TH AVE. S.. SUITE 200 EDMONDS. WASHINGTON 95020 PHONE (425) 778-SSDO FAX (42S) 778-5536 DESIGN: CRA DRAWN: JRP CHECK: RMS JOB NO: 07240.20 DATE: 11/07/07 UJI L) z LLI Ld 7" 0 0 CA 0 00 Lij Ld < :2 La -1 < w 0 0 cK CL 0 0 c-4 a LJ 0 m U) Li I_ 0 SHEET: THESE PLANS HAVE BEEN PREPARED FOR AGENCY REVIEW AND ARE SUBJECT TO CHANGE. DO NOT USE FOR CONSTRUCTION OR BIDDING PURPOSES WITHOUT SIGNED AGENCY APPROVAL STAMP. CALL BEFORE YOU DIG 1-800-424-5555. C2.2 go,- .spAILEY CAS Found RNA woo bor LS4681 I, TV 911� cdcLAated position. CB 12 (TYPE IE)� so] Rtg D± _ IE- 52 E)(TRUDIDI ON . CUIR 3 NEW CONIC. RETAIN NO W, LL (SEE STRUCTURAL PLAN! THE LAURINTINE A CONDOMINIUM SIN 1/4, SECTION 24, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. [ASPHALT CONCRETE BERM CAT04 BASIN TO DIRECT SURFACE EL=92. 2 L WATER TO CB 11 90.006(6_) DETENTION TANK W/ FLOW CONTROL SAWCUT.REMDVE & (D STRUCTURE REPLACE ASPHALT PER CITY RETREMEhj _:�_ - __ -L _ __�_ on'� �ALEIISIINGALL% T OP= GAS Nl� CATCH BASIN 93.0 RIM EL=91.96 CONNECT FOOTING BENCH MARK SET A 6' NAIL IN NORTH -4 PF DRAINS TO 6 FACE OF POVIER POLE OUTLET PIPE UP I FOOT. EL= 95.13 93.25 $ TOP= 1100.5 . TOE- ±97.��'ete 95.00 CB 01 (TYPE 11.) I RIM= 93.58 TOP OF WAUL= 9&82 IE = 90.20 (N) 9615 9382 SEE ARCH. PLANS FOR SIDEWALK RAMPING ELEVATIONS I DP 0 WALL= 96.82 PROPOSED -_W C INC. RETAINING WALL BUILDING ;E§ � TRUCTURAL PLANS FOR DETJ F F E = 96 25' DPW. Elan 5 �v 1-- 95 5 96 25 28 LIF -TRENCH DRAIN 96.0 HOJO'S A 96.0 CONDOMINIUM TOP OF WALL= 96.82 INSTALL FOOTING & ROOF DRAINS PER DETAIL (DOWNSPOUTS PER AROHITECTUI.. 96.0 T TOP= OP= E100.5 Set tockAwd in IQ TOE= ±97.5 95*1 c.lI.t#9567 I Rd 4 foo offwt. C, 0-94.71 TOP= 91 _9 Ir CONCRETE -96PAVEMENT mc h ..k TOE= ±9& 100, �05 TOP= ±10OL5 TOE= ±98.0 L CATCH BASIN oon-te D Sd - nod RIM EL=89.97 ..Ik I-d 24 foot offs,t. 0- 98.88 or I, .,b -ss- -ss- 4 ZF-ss-t4 - -s 90 _SS. 's s- 7 -,s- -ss- -ss- -ss-. ss.- '%s / _ss- s -5s' _s ound ck in SANITARY lud 0.05 mst SEWER MANHOLE d 9 37 df.t RIM EL=9917 R.O.S. 9.75 ospholt top of curb. o' MAPLE ST. 329-90 3N.90 DETENTION SUMMARY CHART LIVE STORAGE VOLUM r DEAD STORAGE VOLUME (cf) RELEASE RATE (cfs) REQUIRED GNED REQUIRED DESIGNED Aq-F1111117 REQUIRED DESI 2 (1/2) 9.6 9.6 O.DD8 0.008 29.9 29.9 0.01 0.01 I- IDO Z_ 0.02 0.02 INUIL11 = Im IENGINkRING 250 4TH AVE. S_ SUITE 200 EDMONDS. WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 ;;1c Z t= 0 ZE m KSTRICTOR PLATE W/ DESIGN: (TYPE IL) 3/4' ORIFFICE DRAWN: 12 C.ErK: DETENTION PIPE W1 FLOW CONTORL STRUCTURE SECTION 11 (TYPE IL) W/ FLOW CONTROLASSEU&Y JOB NO: DATE: SCALE: 3/4" = V-0" 4' DIA PERFORATED PVC PIPE WITH 6' OF 1" MINUS GRAWL ALL AROUND, WRAPPED IN NON -WOVEN GEOTEXTILE FABRIC. SLOPE TO DRAIN GRADE _V1- - 1/9' : 0' UK TURN DOW14 ��FDRATIONS AS S140M FINISHED LEVEL OF CONCRETE SURROM TO BE APPROX 4' DOWNSPI)LIT 1/8- ABOVE TOP OF SURFACING "I TIGKTUNEE T CHANNEL EDGE PER CIVIL DETENTION SYSTEM DRAWINGS E)CPANSt0N JOINT INSTALL ADD DRAIN 0 0 MODEL KIOOS OR EQUAL 0 00 0 oo 0 0.0. 0 CONCRETE PSI MIN. 'L -09 .0. oo 0 BEDDING LAYER Z) 0�0� -0 LINE OF UAX EXCAVATIOK IF SOIL IS OVEREXCAVATED. FOOTING REPLACE WITH LEAN MIX CONCRETE- QFOOTING DRAIN AND ROOF DRAIN SECTION TRENCH DRAIN (IN CONCRETE) -1 - Nis SCALE:- r = 1­0" S 8958)4' E 659.79 6 R = 1% TYP. 10" - CONT. EXTRUDED CONIC, CURB 93.2 W EXP. JTS. @ 20*-0" O.0 _w_ I - 18'con� GRADING QUANTITIES I & SCORE JTS. 0 10'-0" O.C. CATD4 BASN DRAIN MANHOLE TOTAL EXCAVATION (CUT) 925.0 CU. YDS. A.C. PAVING ON 4' CRUSHED RIM 91 EL=89.41 RIM (Lz9g.02 TOTAL EMBANKMENT (FILL) 0.0 CU. YDS. PER CIVIL DRAWINGS WA- - - WA- - - WA - - - WA - - - WA- - - WA - - - WA - - - WA - - - WA - - - WA - - - _w� - - - 11 wi *A - - - WA - - - WA - - - WA- - - WA - - - W­ - -WA - - - W�- - - WA- - - WA - - - WA -WA7 -.-WA- - - WA - - - WA TOTAL 925.0 CU. YDS. con­t� ;� ___ - __ THE QUANTITIES SHOWN ASM ARE FOR THE PERMIT #3 DEFORMEDBAR PROCESS ONLY- THESE VALUES ARE APPROAMATF DO NOT USE FOR BIDDING, PAYMENT. OR ESTIMATING PURPOSES, TYPICAL CURB SECTION 10 0 5 SCALE. 11" = I'-0' THESE PLANS HAVE BEEN PREPARED FOR AGENCY REVIEW AND ARE SUBJECT TO CHANGE. DO NOT USE FOR CONSTRUCTION OR BIDDING PURPOSES WITHOUT SIGNED AGENCY APPROVAL STAMP. CALL BEFORE YOU DIG 1-800-424-5555. Ld C-) z LLA 9 En Ld cr 0 < 0 1, 00 V) m Ld _j CL V) 3: 0 0 Z 5 0 of M 0 04 c) m L0 Ld ;HEET: CRA JRP RIAS 07240.20 11/07/07 z _j EL w 0 z c) 16 0 z C) 0 C3.1 SPECIAL SEWER CONNEC11ON NOTE, L THE CONTRACTOR SHALL ATTEMPT TO LOCATE EXISTING SIDE SEWER ALONG THE WESTERN R/W LINE AFTER SIDE SEWER IS LOCATED. IT SHALL BE VIDEO RECORDED & THE CONTRACTOR & THE CITY INSPECTOR SHALL DETERMINE IF IT IS ADEOUATE SM DDNDITICN & ELEVATION FOR THE PROPOSED CONNECTION. 2. IF SIDE SEWER CANNOT BE LOCATED THE CONTRACTOR SHALL CONTACT THE ENGINEER TO DISCUSS REDESIGN OF OUTLET CONNECTION. .,phdt L- I __ ._TA�EY Of. CAS GAS - - - - - - - - - - - V� � - � I , �� Im-lilm SW 1/4, SECTION 24, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M. "A'N IL S1.S2 'AS PROPOSED BUILDING F F E 96 25 THE LAURINflNE A CONDOMINIUM it L5 INSTALL (31-3/4- WATER SERVICES — 98 S�t tookpood m ,d1or 19557 Of 4 EN,­'11.'1I ' INSTALL (2)-3/4 Bwch morIL WATER METERS INSTALL SEWER CLEANOUT I PER DETAIL M;u GAS ____F.T A -NAIL-. I" CA TCH BASIN RIM EL=91A(i FACE OF POWER POLE UP I Fool EL= 95.13 ­010 pOd HOJO'S A CONDOMINIUM INSTALL NT 6.P;� (a) \�,Z (SCH 40) BE PIPE TO EXISTING SERVICE a q7. r CATCH BASIN —te IN EL=89.97 wadk RE�PTE EASTING METER Set ­9 �.a i� BEHIND SIDEWALK 1wd of 4 foot offt�L 0— 98.88 cwuete wb ss- _ss- _Ss_ _ss- _ss--SS- - 5s- _ss- I /Toi _ss-I 7�1 SVI. _ss- -p-o-q! _ss/ �9USSAZ��4 -ss- -ss- -ss _ss _ss tock in SANITARY tead9OO5f=t .1 77 SAWCUL REMOVE AND MUM SEWER MANHOLE RIII [L=99.27 Osphdt ILO S. 9' 75 top J ASPHALT, CURB & EXW P So Of mrb. CITY OF EDMONDS REOU ENT7 MAPLE S/T. L 329.90 329.90 - — - — - — - — - — S 69'58`14* E 659.79 4 -m- -SA" 41- c -so_ CATCH BASIN Irco- RIM DRAIN MANHOLE @11 EL=99.02 WA- - - WA - - - WA- -ft - - - WA- - - WA- - - W�- - - WA - - - WA - - - WA - - - A - - - A - - - w w w E WA - - - WA - - - WA - - - WA- - - WA- - - WA - - - WA - - - WA- - - WA- - - WA jeWA WA - - - WA - - - WA- -W­ coo� . (FOR FUTURE DEVOLOPMEIM SEWER STUB SHALL BE LOCATED 10 ' INSIDE PROPERTY LINE & STAKED. PLACE 2 4 AT END OF SIDE SEWER STUB AND CUT TO LENGTH 70 ENSURE -� FEET EXTENDS ABOVE GPADE. PAINT TOP 18 INCHES WHITE IN 3 INCH HIGH LETIM STENCIL THE NUMBER OF EVEN FEET FROM GROUND ELEVATION TO THE SEWER STUB INVERT. 8 GAUGE WIRE TO BE DOUBLE WRAPPED AROUND PIPE AND 2x4 STAKE AT OR ABOVE FINISHED GRADE. CASTIRON LOCKING LID LAMPHOLE COVER (EAST JORDAN IRON WORKS CO.) (MODEL 111- 011366108) 6' WYE AND 49 SEND 6 IE AND W 'IS 6 - LA S' LATERAL RUN TO HAVE 6" TEE SLOPE OF ZX MIN. TO SLOPE 5OX MAX. POSSIBLE SEWER MAIN LOCATION CONNECTION AT SHALL BE tUBSEMR ICIIN& BISCUIT PLUG ORLU rT4.7 ANGLE )MER APPROVED WXAT-DMHT PLLIG OR GREATER POSSIBLE SEWER MAIN 0 T E 22-S' OR LOCATION 1. WHEN TAPPING INTO ExisnNG MAIN 45* SEND AN INSERTA-TEE SHALL BE USED. PLACEMENT OF TEE SKALL DEPEND ON DEPTH OF SEWER MAIN. AS A MINIMUM, THE TEE SHALL BE PLACED AT A 45 DEGREE ANGLE. 2- IF CONNECTING SIDE SEWER TO EXIST CONCRETE LATERAL- A CONCRETE/PVC ADAPTER SHALL BE USED AND SECURED PER MFGR'S INSTRUCTIONS. S.- RPES40N ;;Z;� _7 STANDARD DETAIL a GE1iC11T I OInWO4 TYPICAL SEWER LATERAL IL GOUT astiwo d D. �IKJFtT 4�07 ]_ 7Z241M 1� WS K-,'�_CITY OF EDMONDS STD. TYPiCAL SEWER LATERIAL DETAIL E6.4 kil SCALL NTS RESIDENCE CLEA I WITH 45- BEND M. CAP Ir "I NOT To EXCEED 100' BETWEEN CLEAN 0 14xI 4%6' UTS CONCRETE CLEAMOUT, (WYE WITH COLLAR AND LOCK NG LAMPHOI rL_ A. CONCRETE LEVELING C LAR LEVELING COLLAR LC ING LAMPHOLE COVER 0 _iPK 2 MIN. WATER TIGHT CAP RISER CONCRETE PAD N 12- PVC si_gv� .7ER 6 RISER 4' OR 6' SIDE SEVER GENERAL CLEANOUT DETAIL WYE AND 45, SE 12' AND 1/8 DEN 6" CITY STUB 4' OR 6' SIDE SEVER ASPHALT SURFACE CLEAN OUT DEWL AT PROPERTY LINE 12" LOCKING LAMPHOLE COVER (EAST JORDAN IRON WORKS CO.) 6' RISER 12' PVC SLEEVE (MODEL 1: 00366108) PVC CAP R :R -77 `SI Typt YPIGAL CL OUT UNDER ASPWILT NOTE CONCRETE SIDE kWER JOINTS SHALL BE GASKETED km G STANDARD DETAIL A GERD" .11wo SEWER CLEANOUT DETAILS M MCMIEIM 4� WS E.2 4= CM011 ENGIN&RING 250 4TH AVE_ S_ SURE 200 EDMONDS. WASHINGTON 93020 PHONE (425) 778-8500 FAX (425) 778-5536 DESIGN: CRA DRAWN: JRP CH ECK: RMS JOB NO: 07240.20 DATE: 11/07/07 01, V9 w :m C4 0 00 V) La _j CL V) 0 Z G 0 Of M 0 C14 0 CID U-) LLI SHEET: z _j CL cy- LLJ 3:: ui V) 46 Of Lu ------- plmmml��� w (_j-)__C1TY OF EDMONDS STD. SEWER CLEANOUT DETAIL E6.2 5 10 20 SCAI.E. NTS to THESE PLANS HAVE BEEN PREPARED FOR AGENCY REVIEW AND ARE SUBJECT TO CHANGE. D-0-NOT USE FOR CONSTRUCTION,, OR BIDDING PURPOSES WITHOUT SIGNED AGENCY APPROVAL STAMP. CALL BEFORE YOU DIG 1-800-424-5555. C4.1 -GEOTECH CONSULTANTS, INC. 11 01 aftr fvrd J Vince Borcich c/o Gram Sage Graves 144 Railroad Avenue, Suite 101 Edmonds, Washington 98020 Attention: Greg Mummy Subject: Geotechnical Engineering Study Proposed Condominium Building 527 Maple Street Edmonds, Washington Dear Mr. Mummy: 13256 Northeast 20th Street, Suite 16 Bellevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 October 14, 2008 JN 08095 OCT 11- 2008 BUILDING DEPARTMEWT C17Y OF EDIWOiVDS via email We are pleased to present this geotechnical engineering report for the new condominium building to be constructed in Edmonds, Washington, The scope of our services consisted of exploring site surface and subsurface conditions, and then developing this report to provide recommendations for general earthwork and design consideration for foundations, retaining walls, seismic conditions, subsurface drainage, and temporary excavations. This work was authorized by your acceptance of our Contract for Professional Services. We were provided with the Permit Set of architectural and structural plans prepared by Taylor Gregory Butterfield Architects and CG Engineering, respectively, These plans were dated August 19, 2008. From this information, we expect that the existing house will be demolished, and a new 3-unit condominium building constructed in its place. The new structure will have three stories, with parking on the lower level accessed from Maple Street on the south side of the site. The lower floor's slab elevation will be 96.25 feet, requiring excavation of up to approximately 6 feet below the existing ground elevation. An elevator pit will extend below the floor slab in the center of the eastern side of the building. The west and east walls of the building will be set back at least 10 feet from the property lines,'but retaining walls are shown at these property lines to retain cuts that will lower the site grades below the adjacent lots. Paved, on -grade parking is shown along the north side of the site, to be accessed from the alley. If the scope of the project changes from what we have described above, we should be provided with revised plans in order to determine if modifications to the recommendations and conclusions of this report are warranted. SITE CONDITIONS SURFACE The site is a rectangular lot situated between two condominium buildings. Maple Street borders the southern property line, and a paved alley extends along the northern site boundary. The existing house is situated in the central portion of the lot, with a small garage and a concrete patio off the Vince Borcich October 14, 2008 JN 08095 Page 2 north side of the house. The ground surface on the majority of the lot slopes very gently down toward the north, varying in elevation from 102 feet to 98 feet. Along the southern edge of the lot is a short rockery protecting a grade change of 3 to 4 feet down to the sidewalk. There is also a 3- to 4-foot rockery along the northern property line, where the alley is lower in elevation than the site. There are no steep slopes on, or near, the site. SUBSURFACE The subsurface conditions were explored by excavating two test pits at the approximate locations shown on the attached copy of the Topographic Survey. Our exploration program was based on the proposed construction, anticipated subsurface conditions and those encountered during exploration, and the scope of work outlined in our proposal. The test pits were excavated on March 28, 2008 with a rubber -tired backhoe. A geotechnical engineer from our staff observed the excavation process, logged the test pits, and obtained representative samples of the soil encountered. "Grab" samples of selected subsurface soil were collected from the backhoe bucket. The Test Pit Logs are attached to this report. SO Conditions The two test pits encountered similar native soil conditions. Beneath a thin layer of topsoil was loose, gravelly sand containing a low percentage of silt. Th ' is coarse -grained soil became medium -dense within one to 3 feet of the topsoil. In Test Pit 1, located on the northern portion of the site, there was approximately 6 feet of uncompacted fill overlying the native sand. This fill appears to have been placed when the lot was originally graded, in order to create a more level yard area, and is probably soil that was excavated from the existing house. The rockery along the north side of the lot appears to retain the uncompacted fill. The rockery on the south edge of the site protects only native soil, apparently a short cut that was made for construction of the sidewalk. Groundwater Conditions No groundwater or wet soils were observed in the test pits. Considering the granular, moderately -permeable nature of the soils, we do not expect that significant groundwater will be encountered within the depth of the test pits. It should be noted that groundwater levels vary seasonally with rainfall and other factors. The stratification lines on the logs represent the approximate boundaries between soil types at the exploration locations. The actual transition between soil types may be gradual, and subsurface conditions can vary between exploration locations. The logs provide specific subsurface information only at the locations tested. The relative densities and moisture descriptions indicated on the test pit logs are interpretive descriptions based on the conditions observed during excavation. The test pit backfill was not compacted. Loose soil will therefore be found in the area of the test pits. If this presents a problem, the backfill will need to be removed and replaced with structural fill during construction. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 3 CONCLUSIONS AND RECOMMENDATIONS GENERAL THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE PURPOSES OF A GENERAL OVERVIEW ONLY MORE SPECIFIC RECOMMENDATIONS AND CONCLUSIONS ARE CONTAINED IN THE REMAINDER OF THIS REPORT. ANY PARTY RELYING ON THIS REPORT SHOULD READ THE ENTIRE DOCUMENT. The test pits conducted for this study encountered medium -dense, native, gravelly sand that is suitable to support the planned building using conventional foundations. It will be necessary to excavate through the existing fill, topsoil and loose soil to expose this suitable bearing soil. The slab floor of the lower level can be supported on native sand underlying existing fill and topsoil. Floor slabs should not be placed over the existing loose fill, as excessive post -construction settlement relative to the foundations would result. Storm detention/retention facilities and other utilities are often installed below, or near, structures. The walls of storm vaults must be designed as either cantilever or restrained retaining walls, as appropriate. Wall pressures for the expected soil conditions are presented in the Permanent Foundation and Retaining Walls section of this report. It is important that the portion of the structure above the permanent detained water level be backfilled with free -draining soil, as recommended for retaining walls. Should drainage not be provided, the walls must be designed for hydrostatic forces acting on the outside of the structure. The backfill for all underground structures must be compacted in lifts according to the criteria in the General Earthwork and Structural Fill section of this report. Trenches for underground structures and utilities should not cross a line extending downwards from a new or existing footing at an inclination of 1:1 (Ho rizo ntal: Vertical). We should be consulted if these excavation zones will be exceeded for installation of storm facilities or other utilities. Temporary cuts for construction of foundations, retaining walls and other structures should not be steeper than 1:1 (H:V). This should be possible for the planned building. However, adequately - sloped temporary cuts for retaining walls on the property lines would need to extend'onto the adjoining properties. Where it is not possible to obtain permission from adjoining owners for temporary excavation easements, then temporary shoring would be needed to maintain the cuts within the property boundaries. Alternatively, the configuration of the walls and grading could be modified to avoid cuts near the property lines. The erosion control measures needed during the site development will depend heavily on the weather conditions that are encountered. We anticipate that a silt fence will be needed around the downslope sides of any cleared areas. Rocked construction access roads should be extended into the site to reduce the amount of soil or mud carried off the property by trucks and equipment. Cut slopes and soil stockpiles should be covered with plastic during wet weather. Following rough grading, it may be necessary to mulch or hydroseed bare areas- that will not be immediately covered with landscaping or an impervious surface. The drainage and/or waterproofing recommendations presented in this report are intended only to prevent active seepage from flowing through concrete walls or slabs. Even in the absence of active seepage into and beneath structures, water vapor can migrate through walls, slabs, and floors from the surrounding soil, and can even be transmitted from slabs and foundation walls due to the concrete curing process. Water vapor also results from occupant uses, such as cooking and GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 4 bathing. Excessive water vapor trapped within structures can result in a variety of undesirable conditions, including, but not limited to, moisture problems with flooring systems, excessively moist air within occupied areas, and the growth of molds, fungi, and other biological organisms that may be harmful to the health of the occupants. The designer or architect must consider the potential vapor sources and likely occupant uses, and provide sufficient ventilation, either passive or mechanical, to prevent a build up of excessive water vapor within the planned structure. Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the recommendations presented in this report are adequately addressed in the design. Such a plan review would be additional work beyond the current scope of work for this study, and it may include revisions to our recommendations to accommodate site, development, and geotechnical constraints that become more evident during the review process. We recommend including this report, in its entirety, in the project contract documents. This report should also be provided to any future property owners so they will be aware of our findings and recommendations. SEISMIC CONSIDERATIONS In accordance with Table 1613.5.2 of the 2006 International Building Code (IBC), the site soil profile within 100 feet of the ground surface is best represented by Soil Profile Type D (Stiff Soil Profile). The site soils that will support the foundations are not susceptible to seismic liquefaction because of their medium -dense, coarse -grained nature and the absence of near -surface groundwater. As noted in the USGS website, the mapped spectral acceleration value for a 0.2 second (S,) and 1.0 second period (Si) equals 1.20g and 0.42g, respectively. CONVENTIONAL FOUNDATIONS The proposed structure can be supported on conventional continuous and spread footings bearing on undisturbed, medium -dense, native soil, or on structural fill placed above this competent native soil. See the section entitled General Earthwork and Structural Fill for recommendations regarding the placement and compaction of structural fill beneath structures. Adequate compaction of structural fill should be verified with frequent density testing during fill placement. Prior to placing structural fill beneath foundations, the excavation should be observed by the geotechnical engineer to document that adequate bearing soils have been exposed. We recommend that continuous and individual spread footings have minimum widths of 16 and 24 inches, respectively. Exterior footings should also be bottomed at least 18 inches below the lowest adjacent finish ground surface for protection against frost and erosion. The local building codes should be reviewed to determine if different footing widths or embedment depths are required. Depending on the final site grades, overexcavation may be required below the footings to expose competent native soil. Unless lean concrete is used to fill an overexcavated hole, the overexcavation must be at least as wide at the bottom as the sum of the depth of the overexcavation and the footing width. For example, an overexcavation extending 2 feet below the bottom of a 2-foot-wide footing must be at least 4 feet wide at the base of the excavation. If lean concrete is used, the overexcavation need only extend 6 inches beyond the edges of the footing. GEOTECH CONSULTANTS, INC. Vince Borcich JN 08095 October 14, 2008 Page 5 An allowable bearing pressure of 3,000 pounds per square foot (psf) is appropriate for footings supported on competent native soil. A one-third increase in this design bearing pressure may be used when considering short-term wind or seismic loads. For the above design criteria, it is anticipated that the total post -construction settlement of footings founded on competent native soil, or on structural fill up to 5 feet in thickness, will be less than one inch, with differential settlements on the order of one-half inch in a distance of 50 feet along a continuous footing with a uniform load. Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the foundation. For the latter condition, the foundation must be either poured directly against relatively level, undisturbed soil or be surrounded by level structural fill. We recommend using the following ultimate values for the foundation's resistance to lateral loading: 1111, 1 MAIMA 1 -1 VAIXE PARAMILTER Coefficient of Friction 0.45 Passive Earth Pressure 300 pcf Where: (1) pcf Is pounds per cubic foot, and (ii) passive earth pressure Is computed using the equivalent fluid density. If the ground in front of a foundation is loose or sloping, the passive earth pressure given above will not be appropriate. We recommend maintaining a safety factor of at least 1.5 for the foundation's resistance to lateral loading, when using the above ultimate values. PERMANENT FOUNDATION AND RETAINING WALLS Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures imposed by the soil they retain. The following recommended parameters are for walls that restrain level backfill: Active Earth Pressure * 35 pd Passive Earth Pressure 300 pcf Coefficient of Friction 0.45 Soil Unit Weight 130 pcf Where: (1) pcf is pounds per cubic foot, and (ii) active and passive earth pressures are computed using the equivalent fluid pressures. * For a restrained wall that cannot deflect at least 0.002 times Its height, a uniform lateral pressure equal to 10 psf times the height of the wall should be added to the above active equivalent fluid pressure. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 6 The values given above are to be used to design permanent foundation and retaining walls only. The passive pressure given is appropriate for the depth of level structural fill placed in front of a retaining or foundation wall only. The values for friction and pass ive'res ista nce are ultimate values and do not include a safety factor. We recommend a safety factor of at least 1.5 for overturning and sliding, when using the above values to design the walls. Restrained wall soil parameters should be utilized for a distance of 1.5 times the wall height from corners or bends in the walls. This is intended to reduce the amount of cracking that can occur where a wall is restrained by a corner. The design values given above do not include the effects of any hydrostatic pressures behind the walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent foundations will be exerted on the walls. If these conditions exist, those pressures should be added to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need to be given the wall dimensions and the slope of the backfill in order to provide the appropriate design earth pressures. The surcharge due to traffic loads behind a wall can typically be accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Wall Pressures Due to Seismic Forces To model the surcharge wall loads that could be imposed by the design earthquake, we recommend adding a uniform lateral pressure to the above-recom mended active pressure. The recommended surcharge pressure is 7H pounds per square foot (psf), where H is the design retention height of the wall. Using this increased pressure, the safety factor against sliding and overturning can be reduced to 1.2 for the seismic analysis. Heavy construction equipment should not be operated behind retaining and foundation walls within a distance equal to the height of a wall, unless the walls are designed for the additional lateral pressures'resulting from the equipment. The wall design criteria assume that the backfill will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should be accomplished with hand -operated equipment to prevent the walls from being overloaded by the higher soil forces that occur during compaction. Retainin-ci Wall Backfill and Waterproofin Backfill placed behind retaining or foundation walls should be coarse, free -draining structural fill containing no organics. This backfill should contain no more than 5 percent silt or clay particles and have no gravel greater than 4 inches in diameter. The percentage of particles passing the No. 4 sieve should be between 25 and 70 percent. If the native sand is used as backfill, a minimum 12-inch width of free -draining gravel or a drainage composite similar to Miradrain 6000 should be placed against backfilled foundation walls. Free -draining backfill or gravel should be used for the entire width of the backfill where seepage is encountered. For increased protection, drainage composites should be placed along cut slope faces, and the walls should be backfilled entirely with free -draining soil. The purpose of these backfill requirements is to ensure that the design criteria for a retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively impermeable soil or topsoil, or the surface should be paved. The ground surface must also slope away from backfilled walls to reduce the potential for surface water to percolate into the backfill. The section entitled General Earthwork and Structural Fill contains GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 7 recommendations regarding the placement and compaction of structural fill behind retaining and foundation walls. The above recommendations are not intended to waterproof below -grade walls, or- to prevent the formation of mold, mildew or fungi in interior spaces. Over time, the performance of subsurface drainage systems can degrade, subsurface groundwater flow patterns can change, and utilities can break or develop leaks. Therefore, 'waterproofing should be provided where future seepage through the walls is not acceptable. This typically includes limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the outside of the walls. There are a variety of different waterproofing materials and systems, which should be installed by an experienced contractor familiar with the anticipated construction and subsurface conditions. Applying a thin coat of asphalt. emulsion to the outside face of a wall is not considered waterproofing, and will only help to reduce moisture generated from water vapor or capillary, action from seeping through the concrete. As with any project, adequate ventilation of basement and crawl space areas is important to prevent a build up of water vapor that is commonly transmitted through concrete walls from the surrounding soil, even when seepage is not present. This is appropriate even when waterproofing is applied to the outside of foundation and retaining walls. We recommend that you contact a specialty consultant if detailed recommendations or specifications related to waterproofing design, or minimizing the potential for infestations of mold and mildew are desired. SLABS -ON -GRADE The subgrade soil must be in a firm, non -yielding condition at the time of slab construction or underslab fill placement. Any soft areas encountered should be excavated and replaced with select, imported structural fill. Even where the exposed soils appear dry, water vapor will tend to naturally migrate upward through the soil to the new constructed space above it. All interior slabs -on -grade must be underlain by a capillary break or drainage layer consisting of a minimum 4-inch thickness of gravel or crushed rock that has a fines content (percent passing the No. 200 sieve) of less than 3 percent and a sand content (percent passing the No. 4 sieve) of no more than 10 percent. As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab Structures, proper moisture protection is desirable immediately below any on -grade slab that will be covered by tile, wood, carpet, impermeable floor coverings, or any moisture -sensitive equipment or products. ACI also notes that vapor retarders, such as 6-mil plastic sheeting, are'typically used. A vapor retarder is defined as a material with a permeance of less than 0.3 US perms per square foot (psf) per hour, as determined by ASTM E 96. It is possible that concrete admixtures may meet this specification, although the manufacturers of the admixtures should be consulted. Where plastic sheeting is used under slabs, joints should overlap by at least 6 inches and be sealed with adhesive tape. The sheeting should extend to the foundation walls for maximum vapor protection. If no potential for vapor passage through the slab is desired, a vapor barrier should be used. A vapor barrier, as defined by ACI, is a product with a water transmission rate of 0.00 perms per square foot per hour when tested in accordance with ASTM E 96. Reinforced membranes having sealed overlaps can meet this requirement. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 8 DRAINAGE CONSIDERATIONS Foundation drains should be used where (1) crawl spaces or basements Will be below a structure, (2) a slab is below the outside grade, or (3) the outside grade does not slope downward from a building. Drains should also be placed at the base of all earth -retaining walls. These drains should be surrounded by at least 6 inches of 1-inch-minus, washed rock and then wrapped in non -woven, geotextile filter fabric (Mirafi 140N, Supac 4NP, or. similar material). At its highest point, a perforated pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space, and it should be sloped for drainage. All roof and surface water drains must be kept separate from the foundation drain system. A typical drain detail is attached to this report. For the best long-term performance, perforated PVC pipe is recommended for all subsurface drains. The structure includes an elevator, so it may be necessary to provide special drainage or waterproofing measures for the elevator pit. If no seepage into the elevator pit is acceptable, it will be necessary to provide a footing drain and free -draining wall backfill, and the walls should be waterproofed. If the footing drain will be too low to connect to the storm drainage system, then it will likely be necessary to install a pumped sump to discharge the collected water. Altematively, the elevator pit could be designed to be entirely waterproof; this would include desig6ing the pit structure to resist hydrostatic uplift pressures. No groundwater was observed during our field work. If seepage is encountered in an excavation, it should be drained from the site by directing it through drainage ditches, perforated pipe, or French drains, or by pumping it from sumps interconnected by shallow connector trenches.at the bottom of the excavati on. The excavation and site should be graded so that surface water is directed off the site and away from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent to the building should slope away at least 2 percent, except where the area is paved. Surface drains should be provided where necessary to prevent ponding of water behind foundation or retaining walls. GENERAL EARTHWORK AND STRUCTURAL FILL All building and pavement areas should be stripped of surface vegetation, topsoil, organic soil, and other deleterious material. The stripped or removed materials should not be mixed with any materials to be used as structural fill, but they could be used in non-structural areas, such as landscape beds. Structural fill is defined as any fill, including utility backfill, placed under, or close to, a building, behind permanent retaining or foundation walls, or in other areas where the underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a moisture content at, or near, the optimum moisture content. The optimum moisture content is that moisture content that results in the greatest compacted dry density. The moisture content of fill is very important and must be closely controlled during the filling and compaction process. The allowable thickness of the fill lift will depend on the material type selected, the compaction equipment used, and the number of passes made to compact the lift. The loose lift thickness should not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not sufficiently compacted, it can be recompacted before another lift is placed. This eliminates the need to remove the fill to achieve the required compaction. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 9 The following table presents recommended relative compactions for structural fill: Beneath footings, slabs 95% or walkways Filled slopes and behind 90% retaining walls 95% for upper 12 inches of Beneath pavements subgrade; 90% below that level Where: Minimum Relative Compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum dry density, as determined in accordance with ASTM Test Designation D 1557-91 (Modified Proctor), Structural fill that will be placed in wet weather should consist of a coarse, granular soil with a silt or clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve should be measured from that portion of soil passing the three -quarter -inch sieve. LIMITATIONS The conclusions and recommendations contained in this report are based on site conditions as they existed at the time of our exploration and assume that the soil and groundwater conditions encountered in the test pits are representative of subsurface conditions on the site. If the subsurface conditions encountered during construction are significantly different from those observed in our explorations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully anticipated by merely taking soil. samples in test pits. Subsurface conditions can also vary between exploration locations. Such unexpected conditions frequently require making additional expenditures. to attain a properly constructed project. It is recommended that the owner consider providing a contingency fund to accommodate such potential extra costs and risks. This is a standard recommendation for all projects. This report has been prepared for the exclusive use of Vince Borcich, Gram Sage Graves, and their representatives, for specific application to this project and site. Our conclusions and recommendations are professional opinions derived in accordance with current standards of practice within the scope of our services and within budget and time constraints. No warranty is expressed or implied. The scope of our services does not include services related to construction safety precautions, and our recommendations are not intended to direct the contractor's methods, techniques, sequences, or procedures, except as specifically described in our report for consideration in design. Our services also do not include assessing or minimizing the potential for biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site development. GEOTECH CONSULTANTS, INC. Vince Borcich October 14, 2008 JN 08095 Page 10 ADDITIONAL SERVICES Geotech Consultants, Inc. -should be retained to provide geotechnical consultation, testing, and observation services during construction. This is to confirm that subsurface conditions are consistent with those indicated by our exploration, to evaluate whether earthwork and foundation construction activities comply with the general intent of the recommendations presented in this report, and to provide suggestions for design changes in the event subsurface conditions differ from those anticipated prior to the start of construction. However, our work would not include the supervision or direction of the actual work of the contractor and its employees or agents. Also, job and site safety, and dimensional measurements, will be the responsibility of the contractor. During the construction phase, we will provide geotechnical observation and testing services when requested by you or your representatives. Please be aware that we can only document site work we actually observe. It is still the responsibility of your contractor or on -site construction team to verify that our recommendations are being followed, whether we are present at the site or not. The following attachments complete this report: Site Exploration Plan Test Pit Logs Typical Footing Drain Detail We appreciate the opportunity to be of service on this project. If you have any questions, or if we may be of further service, please do not hesitate to contact us. MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. NAL EXPIRES Marc R. McGinnis, P.E. Principal GEOTECH CONSULTANTS, INC. /"-, /2-0-og 9 10 11 pholt I. -I RIM EL.-92.62 �L4� Li votv* �j > GAS GW R.-It" Ls-aq:59, E cone. wall -- r- I P z �Z4 9.9 9 P.I. C' Ole 7or con .too o o og, drive u 0 RENCH MARK- 'aIt, soil Set a 6' nall 2'hawthor in north face ',D no of power pole Concrete up 1 Foot. a pad El.- 95.13 TP-1 b 0 0 . S. concrete 1 100 0 0 pad W u I V) 0 u F. 4 b z �91-00 8 1 1 J':edor - 5 u I 3� 31 a, oil 2 E soil F.R. V! HOJO'S I 4 #527 A CONDOMINIUM u 20 Solt soil u Lon c do, soil I . I roc or. TP-2 'z �'Z =9 one. io% I nao 'Neead t 4 " r t. 3110erl tq�.- 9 .88 concreU curo PRIOR SURVEY LOCATED THE 0.93 $loot INTERSECTION 014 M.H. -k i- SANITARY SEW PER 'x' MARKS CRISSCROSS .as., / A RIM FFse 014 M.H. RIM. ALSO, FOUND IN 1975 SURVEY FOR 0,00 LAURINTINE CONDOMONIUM. 329.90 �2 -�&% I S 89'58'14' E 659.79 POINT FALL ON SANITARY .one, , W.1c. ST12RM SEWER MANHOLE. SET FOUR HAG NAIL 'RAIN M NHOL- STRADDLE POINTS. 9 MAPLE ST. FR WL concreto evel, GEOTECH CONSULTANTS, INC. Legend [A = Approximate Test Pit Location SITE EXPLORATION PLAN 1527 Maple Street Edmonds, Washington Job Date: Scale: Plate: 08095 March . 2008 1 Not to Scale TESTPITLOGS 527 Maple Street Edmonds, Washington TEST PIT 1 0-0.5 TOPSOIL 0.5-6.0 Brown, slightly silty, gravelly SAND, medium- to fine-grained, moist, loose (FILL) 6.0-9.0 Old Topsoil over Brown, slightly silty, gravelly SAND, medium- to fine-grained, moist, loose I -becomes medium -dense at 7 feet I teSL r_1L Wdb turiflirlatea at a aepin OT 'd.0 Teel on marcn;�d,;�uud. No groundwater seepage wasobserved in the test pit. TEST PIT 2 0-0.5 TOPSOIL 0.5-5.0 Brown, slightly silty, gravelly SAND, medium- to fine-grained, moist, loose -becomes medium -dense at 3 feet i est ra was ierminatea ai a aepin OT b.0 Teel on March 28, 2008. No groundwater seepage was observed in the test pit. GEOTECH CONSULTAWS, INC. TEST PIT LOGS 1527 Maple Street Edmonds, Washington Job Da te: I scale: Plate: 08095 March. 2008 1 Not to scaie Slope backfill away from foundation. Provide surface drains where necessary. Backfill (See text for requirements) Tightline Roof Drain (Do not connect to footing drain) Possible Slab 4" Perforated Hard PVC Pipe (invert at least 6 inches below slab or crawl space. Slope to drain to appropriate outfall. Place holes downward.) C.'" CID .9 Zpq C'- Vapor Retarder/BaOier and Capillary Break/Drainage Layer (Refer to Report text) NOTES: (1) In crawl spaces, provide an outlet drain to prevent buildup of water that bypasses the perimeter footing drains. . (2) Refer to report text for additional drainage, waterproofing, and slab considerations. GEOTECH CONSULTANTS, INC. FOOTING DRAIN DETAIL 527 Maple Street Edmonds, Washington Job Date: 00, scale: S I I Plate: 08095 Oct. 2 Not to ca e I GEOTECH CONSULTANTS, INC. Vince Borcich c/o Gram Sage Graves 144 Railroad Avenue, Suite 101 Edmonds, Washington 98020 Attention: Greg'Mummy Subject: Evaluation of Allowable Soil Bearing Capacity Proposed Condominium Building 527 Maple Street Edmonds, Washington Dear Mr. Mummy: 13256 Northeast 20th Street, Suite 16 BeHevue, Washington 98005 (425) 747-5618 FAX (425) 747-8561 March 28, 2008 JN 08095 via email greg@gramsagegraves.co. On March 28, 2008 the undersigned principal engineer visited the subject site in Edmonds to observe the excavation of test pits and to assess the appropriate design bearing capacity for foundations of the new building. Our services were provided in general accordance with the limited scope authorized in our Contract for Professional Services. We have not seen the plans for the proposed development. However, from our discussions with you, we understand that the existing house will be demolished and a new condominium building will be constructed in. its place. The new building will be at least 10 feet from the property lines and will be burilbd 4 to 5 feet below the existing grade. This will allow the lower level to be accessed from the alley to the north of the site. We expect that the lowest floor will be a slab on grade. We observed the excavation of test pits on the north and south sides of the site. The undisturbed, native soil profile encountered in both of these test pits consisted of a thin layer of topsoil and one to 2 feet of orangish-brown, highly -weathered, slightly silty sand overlying medium -dense gravelly sands. In the northern test pit, closest to the alley, we observed approximately 6 feet of fill soil overlying the native soil profile. This fill appears to be gravelly sand that was originally excavated for the basement of the existing house. No groundwater seepage or wet soil conditions was observed in either of the test pits, which extended to a maximum depth of 9 feet. I Based on our observations, the medium -dense gravelly sand encountered in the test pits is suitable to support conventional foundations. In our professional opinion, an allowable bearing capacity of up to 3,000 pounds per square foot (psf) is acceptable for this soil. We recommend that the foundations be excavated with a smooth backhoe bucket to avoid disturbance of the clean sand. Following excavation of the footings, the subgrades should be recompacted using a small vibratory sled compactor. It appears that excavation on the north portion of the site will have to extend close to the level of the existing northern alley in order to reach suitable native bearing soils. if overexcavation below the planned footing subgrade elevations is necessary to reach the native bearing soils, either the foundations could be extended downward or the overexcavation could be backfilled with compacted quarry spalls or two -two 4-inch recycled concrete. RECEIVED J U N 1 6 2008 BUILDING DEPT. Vince Borcich c/o GramSageGraves March 28. 2008 JN 08095 Page 2 If you have any questions; or if we may be of further service, please do not hesitate to contact us. MRM: jyb Respectfully submitted, GEOTECH CONSULTANTS, INC. . Y1, C � '1' 1 WAS ST A Li� �IRES � Marc R. McGinnis, P.E. Principal GEOTECH CONSULTANTS, INC. tgbaI taylor gregory butterfield architects CO CL II -- co (0 0 W 09 I cm Lu CL L0 co (n C) (0 C) C) C� Ld CD �u (u C) Z:) C) ON r- 'IT ()N 0i ON __c _P LO In Z --i N 90*00'00' E 659.68 DAYTON ST. 52� A C1 9 10 power asphalt Vautt o-up, 9CLS Ive valve asohalt a:ttev I 6nEhor 9r, E== Found RMA iron bar LS4681 In calculated position. h BLOCK 121 33 THE LAURINTI.NE A CONDOMINIUM Q, U _y 4. 0 0 < lorj 0 Cu 0 U C) �D CD x z Soil IU I GAS C9 C—GAS '5.9' E conc. watt CATCH BASI-N-1 power pote / Z� 4;.99 .<)Z 'Wood f6nce ]RIM EL.=91 . 961 BENCH MARK: soil Set a 6' noLiL 2'hawthorne U in north fcce 0 of power pole concrete up I f Oct. 0 pad Et.= 95.13 0 concrete pact Li C: I OVER- HANG L 100 U C c:$ B u 100 c 0 3 1 J'cedar u 30 soil co !122,�' A+CCONDOMINI S.F.R. I H111'S #527 co UM 6 Solt L >1 Solt r (IC Set tack/lead in collar #9567 at 4 foot offset. Elev.=94-71 ' Solt Bench mark._-� loo—L49.99 tw soil sm POINT FALL ON SANITARY SEWER MANHOLE, SEE R.O.S. VOL. 37, P.43 W NO �,D /_1__j co 71 LO aN cu '\\�N 20 0 20 40 60 Scate: 1' = 20' MERIDIAN: PER RECORD OF SURVEY REC. #9201235004. (N 00*02'20' E) 5TH. AVE. S. EQUIPMENT AND PROCEDURE1 ACCURACY MEETS WAC 332-130-090. 05' TOTAL STATION USED FOR A TRAVERSE. MONUMENTS SHOWN VISITED 19 SEP., 2006 LEGEND: 0 DENOTES A 24' x 1/2' IRON BAR SET WITH A CAP #9567. VERTICAL DATUM: EDMONDS 'R' IN MULLER ON TOP OF A FIRE HYDRANT AT S.W. CORNER OF 4TH AVE, S. AND DAYTON ST. ELEVATION = 61.35 LEGAL DESCRIPTION: LOT 31 AND THE EAST 20 FEET OF LOT 32, BLOCK 121, CITY OF EDMONDS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 2 OF PLATS, PAGE 39, RECORDS OF SNOHOMISH E; COUNTY, WASHINGTON. C) SURVEY NOTES: REFER TO CHENDWETH FIELD BOOKS BOOK 145, P. 27 (SURVEY) BOOK 209, P. 57 (LEVELS) BOOK 191, P. 5 (SURVEY) BOOK 108, P. 17 (SURVEY) BOOK 117, P. 50 (SURVEY) t��F u D�, conc. watt lconc. concrete ID %D �D r. ON 7 walk water i C� Set mag nail In lead at 4 foot offset. Etev.= 98.88 heter I - - concrete c uro PRIOR SURVEY LOCATED THE 0.93 stone r)er//QtcLn n SS C) SS _j P, C /Found tack in :3: SS INTERSECTION ON M.H. SANITARY RSEWE C:) MANHOLE IM PER 'x' MARKS CRISSCROSS SAN17 Cl) - rOA �IZ Y�\v' 00 0 lead 0.05 east/ [�? C) EL.=99.27 ON M.H. RIM. ALSO FOUND IN !MANI 0 �LE RIM 00 =67.00 67 asphalt GO at 9,77 off set. R.O.S. 9.75 0) C3 1975 SURVEY FOR LAURINTINE CONDOMONIUM, [SANITARY S Y M top of curb, 01 01 PA�HO ERl�� - L 6 7�3 329.90 329.90 S 89*58'14' E 659.79 0 y _j POINT FALL ON SANITARY 84.4 _-t 93.2 84_.4 STORM — 18'conc.@ 93.2 STORM SEWER MANHOLE. 18'conc. STORM 18'conc. 18'conc. Eon'. SET FOUR MAG NAIL DRAIN MAR_Hffl[�E TC SS�nN \.6 ICATCH B�A MAPLE ST I :LE DRAIN MANHII, STRADDLE POINTS. IRIM DRAIN MANHOLE IRIM EL.=67.81 OD; RIM EL.=89.411 1 M L_89 WL EL.=99.02 RIM EL.=67.f;4 —WL— WL concrete curb RECORDER'S CERTIFICATE ............... SURVEYOR'S CERTIFICATE Surveys * Topography Sanitation * Short Plats * Formal Plats for this day of 2006 at M This map correctly represents a survey made by me CHENOWETH filed record .......... ......... in 1000k ...... O-F ........ cLt page ...... at the request ...... of or under my direction in conformance with the ASSOCIATES, INC., P.S. requirements of the Survey Recording Act at the ALBERT W. CHENOWETH ......................... ......... Profession3l Land Surveyors ................................. in ��g 2006 request of BRAD BUTTERFIELD 18130 Midvale Ave. N., STE. A ..................... ...... ............... ..... ..... 1.11 ....................... Seattle Wa. 98133 MGR. SUPT. OF RECORDS CERTIFICATE NUMBER .... 95.67 .......... (206)-542-2188 * (425)-672-8333 FAX x (425)-672-8333 t425.778.1530 2119111176thAveW.Suite210 f 425.774.7803 Edmonds -WA 98026 info@tgbarchitects.com www.tgbarchitects.com 3605 REG, JOHN IF TEOFV 527 Maple Street Edmonds, WA 98020 SITE SURV EY ASSUANCE IN THE S,W, 1/4 S,W. 1/4, SEC, 24, T-27—N, R-3—E, WX IN THE CITY WA HESUB MaNCENT BORCICH OCT — 2 2008 BUILDING DEPARTMENT CITY OF EDMONDS D WN. B Y: DATE: JOB NO. LS 260,36 PAUL J. PISINGER'; 22 SEP., 2006 F.B. 210 P. 71 4 SCALE: SHEET CHKD. BY: A.W. CHENOWETH. 20' 1 OF 1 PROJECT INFORMATION PROJECT NO: 06063 '3 PROJECT MANAGER: JOE MOLINA DRAWN BY: JOE MOLINA PERMIT SET SHEET NO y COPY SURVEY - - ------------- R III' u B OCT - 2 2008 SUILDING DEPARTMEN! MY OF REDMOHID��