533 DAYTON ST.PDFiiiiiiiiiiiiii
10821
533 DAYTON ST
ADDRESS:
TAX ACCOUNTIPARCEL NUM-BER:.0043�2123002,�DQ
BUILDING PERMIT (NEW STRUCTURE):
COVENANTS (RECORDED)
CRITICAL AREAS:
DETERMINATION: n Conditional Waiver F] Study Required [] Waiver
DISCRETIONARY PERMIT ff'S: Ppb ta,�-&Affi (60,qD
DRAINAGE PLAN DATED: I I - q -s I
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR:
PERMITS (OTHER): fq8JOASW gpog I YMe&)
� a) PSIZL�(ZLb) IMSM76ad) fq 2
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED: S1191&
SEWER LID FEE $: LID #:
SHORT PLAT FILE:
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMfT(S) #:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT #:
FOR:
WATER METER TAP CARD DATED:
LOT: BLOCK:
LATEMP\DSrs\Fbmis\Street File Checklist.doc
The City of Edmonds Side Sewer Drawing EASEMENT NO - --------------------------------------------
102-08450 NEW CONSTRUCTION [I REPAIRS E] LID NO . .................. AsmT. NO - ------------------
OWNER .... PHIT.T.TP ... ES-CANDDN ---------------------------------------------- CONTRACTOR .................................................................................... PERMIT NO . ....................
JOB ADDRESS . 533 DAYTON STREET
....................................... -------------------------------------------- LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ---------------------------
..................................................................................................................................................................
NAMEOF ADDITION .......................................................................................................................
0
0
DYE TESTED ON SETTER
Approved:
* -4
I
PWW-0001-11/75 (REV.11178) DATE ............................................ By --------------------------------------------------
TIR 1, talf �- - 0
- 31
A-�
Lv
--.v
Asp
Afid
t4 J
TA
L
71
4
A
ip
MIMI
Timm
AKW
-boLbWE
�rw
AAARMM
Wqhl
39 JQ41541
ll:Z3
low
_ET
. P.
0
MCA UA5114:
Am 0j"O(OIX TRE14CW L.WNGTH
tevvR
LWVM 'MEN"
4 4-�616pff'%F pwff .1/ CAP
04TEE W/ .0 LOWS LEGS
4 4
SYSTEM CROSS—SECTION
-T&ENC" COVER —
3/40- WASUIEI)
GRAVEL
,6:;
4!
Lr
TRENCH CROSS—SECTION
STANDARD DRAINAGE PLAN
INFILTRATION SYSTEM
for
location
plan by
phone
date
DESIGN DATA
Trench Perc LF per Imperm Trench
Number Rate 1000 sq.ft. Arej_ Req.
C UnK
Wo
NOTES
I Call Engineering Division (771-3202)
for prebackfill and final inspections.
2..Responsibility for operation and
maintenance of drainage systems on
private property is the responsibility
of the property owner(s). Preventive
maintenance consists of preventing
soil and other materials from entering
trench during construction as well as
after construction. Catch basins should
be cleaned of floating material and
sediment at re ular intervals (at least
twice per year3.
CITY OF EDMONDS
rm'*5000 -FT OF IMPEAVIOU.5 SUAFRCE
m Riaggy
62a
2 150
�-' -
8 to 12- /4 ./6 18-
R A TE CMINure.5 Pa Incq)
L Lovell- Sauerl and & Assoolegas, line.
V-MWgV= 0 OMMMPU= CDNMTA= PUMMU
am MM AMM W. 0 wfi=W wk IM3 F=M MUM
Z
0
U
04
0
W.
I. I . . lqw,
CI,Ty OF EDMONDS
COMIMUNITY SERVICES. DEPARTMENT.
IeIGHT-OF-WAY CONSTRUCTION PERMIT
A. 9 Owner: -Washington Natural Gas Company B . .. 46 Contractor:
Permit No�
Issue Date
Name
�1,yemercer stre'et
Mailing Address Mailing Address
Seattle WA '98111
State Zip City State Zip
City
State License Number Telephone Number
C. *Address or Vicinity of Construction: 533 Dayton Street I
Type of Work to be Done: Install New Service
D. 0 Work in Connection With: El Sub pr,Plat El Single Family 0 City Projects
0 Commercial El Multifamily .61 Utility
X 4 (1)'@ Gas
E. 0 Pavement Cut: R) Y D N F. 0 Size of Cut:
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signatur. to this application, agrees to hold the City of Edmonds
?d n what�6ever . C7 J
harmless from any injuries, damages, or claims of any kjj� jpf�do-Ati. Ror-se&)fdr unforseen, that may.
be made against the City of Edmonds, or any of itg'—ftartments ofemployees, including or n6t'limited to *the defense
of any legal proceedings including defense costs, -court costs, and att.9r1ey fees by reason of'granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MkTERIALS FOR A PERIOD OF ONE.
YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE Of THE WORK.
Estimated restoration fees will be helduntil the final street patch is completed by City forces, at which time a debit or credit will be
processed for issuance to the applicant.
9 A 24 hour notice is required for inspection; Please call Engineering: 771-3202
o Work is to be inspected during progress and at completion.
0 Restoration'to be in accordance with City Code.
0 Street to be kept clean at All times.
6 Traffic Control to be in accordance with City regulations.
0 All street -cut ditches must be patched with. asphalt or City approved material prior to end of.working day;
NO EXCEPTIONS.
I understand the above.and that this permit must be available at the job. site for inspection purposes At all times.
January.3,1991
Signature: Date:
Owner or Contractor
This . Permit Must be Posted at the job Site For Inspection Purposes
Call DIAL -A -DIG Prior -to Beginning'Work
APPROVED BY: J�\A/ PERMIT FEE:
Time Authorized: Void after'MARC-M 23 days. Restoration. Fee:
Special Conditions: W Receipt No.:
Fund I I I Fee:
Street Cut Dimensions:'
RELEASED
Date 'INSPECTED BY
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
x $
Date
Eng:'Div. March 1989
Eng. Div. July 1985
V
)��
Washfumjton
NaturM&iiW
AVVhI*Xjb- &-WG7TpffV
—Addendum to:
City of Edmonds
Permit Application
Engineering Aide: Kerry Walsh
Washington Natural Gas
622-6767 x2761
I
lep h unknown
a
Key:
:s- squitary sewer
w- war-er
-g- gas
water valve
hydrant
815 Mercer St. (P.O. Box 1869), Seattle, WA 98111 (206) 622-6767
CITY OF EDMONDS
250 5th AVE: N. EDMONDS, WASHINGTON 98020 - (206) 771-3202
BUILDING DIVISION
April 18, 1984
LARRY S. NAUGHTEN
MAYOR
Peoples National Bank
140 4th Avenue S.
Edmonds, WA 98020
RE: Project: California Concept/533 Dayton Street
Owner: Becky Strom.
Account No.s: 0330-08794-1 & 0330-08671-1
The City of Edmonds hereby authorizes the release of
$912.80 held in the above accounts in lieu of. mainte-
nance bonds for the above project.
If you have any questions, please contact the Building
Division.
Harold Reeves
Building Official
cr
cc: Becky Strom
A
IWR-OFFICE COMMUN �TIONS.;�-'�--
c
mar h 29 19-84'
DATE
g: Bui I ing
To ,Eng-i ' nee;r-i n FROM d
�SUBJECT:'. California Concept 533 Dayton Street.
Permit #810498
t;;.z
Please do an inspection for release of mal
int.enance bonds
Landscaping $335.00.(Becky called on 3/28/84 And said she
completed the items.)
Paving and Drainage $577.80
A,
R
D
MAR 2 9 1984
ENGINEER
ING
4b
a
,e-�z /-� lf,,P-X
0
0
I
&Kzz�-
0
CITY'OF EDMONDS LARRY S. NAUGHTEN
250 5th AVE N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 MAYOR
BUILDING DIVISION
March 20, 1984 - ' -
California Concept
Attn: Becky Strom
533'Dayton
Edmonds, WA 98020
RE: PROJECT ADDRESS: 533 Dayton
PERMIT NO: 810498
LANDSCAPE BOND AMOUNT: $335.00
On March 14, 1984 the Planning Department made an
inspection on the landscaping at the above project.
Prior to release of the above maintenance bond, the
following items need to be completed:
1. It appears that two horizontal junipers are either
dead or dying and should be replaced.
a. one juniper is in fi�ont west bed by fence
b. one juniper is in west bed by front of building
(west corner)
2. Two azaleas should be planted in the west bed by the
front of the building as called for on the landscape
plan.
Please contact Bruce Finke in the Planning Department for
an�inspection when these items are completed.
C-i ndy Ri Is tM--
Permit Coordinator
E
0
6�/Va : 4elAvDly 1`6'40117-
111=de-o /V : IQA-Mn5�� 4
-Vj&.7-25"CT: 11VL,5rtPe67'1oA1 o,.c C.41-1rqo,4roV1A
5-33 PA)e'rolv s�r, .494
Z54VD
O-e.o.- ItAe--e,
N
000z.- 0�-7 Xl...41-
04S469 SEND PARTS 1 AND 3 WITH CARBON INTACT. -
POLY PAK (50 Sets) 4P 469 . PART 3 WILL BE RETURNED WITH REPLY.
ASR FORM 141
SUBJECT: (21Q�k Gz�
6cq, e,
N
04S469 SEND PARTS I AND 3 WITH CARBON INTACT. -
PMY PAX (50 SETS) 4P 469 PART 3 WILL BE RETURNED WITH REPLY.
A-,
CITY OF E13MON138
CIVIC CENTER EDMONDS, WASHINGTON 98020 (206) 775-2525
COMMUNITY DEVELOPMENT DEPARTMENT
May 26, 1982
Peoples National Bank
140 4th Avenue S.
Edmonds,,WA 98020
RE: 'Project: 533 Dayton Street
Owner: Becky Strom
Account: 0330086741
HARVE H. HARRISON
MAYOR
The City of Edmonds hereby authorizes the release of . .
$1,044.70 held i,n the.above account in lieu.of a performance
bond for paving and.draining�'requirements for the
California Concept project.
The remaining $577.80 must be held in this account for 24
months i'n-lieu of a maintenance bond -and shall not be
released until written authorization from the City is
received.
If you have any questions, please contact the Bui1ding
Diviston.
Harold.Reeves
Building Official
cn
40
EDMONDS
CITY OF
CIVIC CENTER * EDMONDS. WASHINGTON 98020 (206) 775-2525
COMMUNITY DEVELOPMENT DEPARTMENT
Ma r'ch 12, 1982
HARVE H. HARRISON
MAYOR
.Peoples National Bank
140 4th Avenue'S,.':,.
Edmonds,'WA 98020
RE: Project: 533 Dayton Street
Owner: Becky Strom
Account: 0330086703
.The City of Edmonds hereby authorizes the release of
the $2229.51 held in the above account in lieu of
a performance bond on landscaping requirements.
If there are any questions, please contact the Building
Division.
Harold Reeves
Building Official
cn
fi�7
zf -I-
fy
I - 1� -7-
Aw.
Z-V V�!
k.i
M.
I.: Z3
4f
lit:
V-7Eb h-
AR&N TAEAtem REauiAF-p FoA-5-60(9-5a. F
Al?Sq
VOID Rjwlo'SO%
.900 WAS14ED GRAVEL
Ply. P/Pf
4
PERC OLA TION
-1-1. Z. UP �7- � . 04'. -
to 12- /4 ./6
Iq A Tz"
Cmmurc.5 *.Pst bic@
18,
Lovell- Sauerland & Assopiates. Ine.
SUW*IVM o Onvaa%mw C000mT*xm PL4wdm
f4 =10 IMIN AWL W. 0 WXMW WP. � PHON TWUM
78064b
FILE # ADB-1 13-78
FORM FOR DECUMATION OF [SEP aUXVM-/1NONSIGNIFIMNCE]
Description of proposal Revision and expansion of parking areas and
expansion of drive-in teller area.
Proponent Peoplels.Naflw6l Bank
Location of Proposal 140 4th Avenue
Lead Agency City -of Edmonds
1his yroposal has bccn determined to [W*/not haN,, e a significant ad-
0
verse impcct upon -the emrirorincnt. Ali EILS �Wis not] required Linder
10-1 43.21C.030(2)(c�). This decision was made after review by t1lic. lead
a0clIC), 0, a conlDleted envirm-.1cntal checIdist and other information on
file with the 1�ad agency.
Responsible Official 'C_."Nancy' Edgmon Luster
Position/Title Associate City Planner
Date November 29, 1978
Signature (cc L
z
U
0
U
0
z
0
LU
0
CII-Y OF EDMONDS 49
PUBLIC WORKS DEPARTMENT
RIGHT - OF - WAY CONSTRUCTION PERMIT
A. oAddress or vicinity of Construction
-'3 �
�, , L.,_,,yton,
0 Owner: fr),-trom
Name
55 Dayton,
Mailing Address
Wash 913036
city, State, Zip Code
0 Contractor: Olds clympic znc.
Name
Mailing Address
L!Mnw00(5,, Wa3h 98086
City, State, Zip Code
Wit No.
IssueDate
0 Permit Issued To
0 Type of Work to be Done: PA Ui 'T-,(,
/I Ir P r . I
9 Work in Connection With:
El Sub or Plat 0 Single Fam ly
-:p Comm]. / Ind. 0 Apt. Condo.
Pavement Cut: El Yes No
223-01 OLDSO 317BO�%
State License Number
778 312,C
Telephone Number
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
B. APPLICANT TO READ AND SIGN
INDEMITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless
from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made
against the City of Edmonds, or any of it's departments or employees, including or not limited to the defense of any legal
proceedings including defense, costs, court.costs, and attorney fees by reason of granting this permit.
Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year
following the final inspection and acceptance of the restoration by the Engineering Division.
Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed, at
which time a debit or credit will be processed for issuance to the applicant.
Work is to be inspected. Restoration to be in accordance with City Code. Traffic Control to be in accordance with Traffic
Section of City Code. Street to be kept clean at all times. A 24 - hour notice is required for inspection by Engineering. Call
775-2525, extension 220.
I understand that this permit mus(t �2vailab-l�'at the job site for inspection purposes at all times.
Signature: Date
Owner or Age'nt
THIS PERMIT MUST,BE POSTED AT THE JOB SIT FOR INSPECTION PURPOSES
C,ALL DIAL - DIG PRIOR TO BEGINNING WORK
C. Issued By:
3 c
Time Authorized: Vold after - —days
Special Conditions:
Ammendments:
Permit Fee: � 3 b.
Security Deposit:
Receipt No.: -7
Fund I I I Fee:
Street Cut Dimensions
X
NO,;W,,O,,RK\TO BEGIN PRIOR TO�PERMIT ISSUANCE
Eng. Div. December 1978
FIELD INSPECTION OES
(Fund 111 - *te con 4. . "
v to Street Deot.
O^mm� " 4- � -
Diagram:
Contractor called for inspection., Yes NO
Work Disapproved Bv: Dat Bv: Date:
Work Approved By: Date:
Inspector:
Ena. Div. December 1978
F�
.
0 " 0
THE MANSARD BE LIMITED TO A FOUR COURSE CONCRETE TILE AT 6/12 WITH A
411- 5" PARAPET; METAL FASCIA OF 1"x 4" TUNG AND GROOVE SOFFIT; STAIRWAY
WITH BRICK WALL AND PIPE RAIL ON TOP AT WINDOWSILL HEIGHT; THE COLOR
OF METAL AND COLOR OF PAINT ON RAIL SHOULD MATCH. MOTION CARRIED.
!RL63.- REBECCA STROM - Review of site, elevations, landscapin and signs for
.91 California Concepts Hair Design at 533 Dayton St. (BC?
Mr. Kinderfather left the meeting prior to hearing of this item as his
fi rm is the architect for the project. The proposal was to remodel
the structure on the site which is a poorly maintained, single-family
home. The site appeared to be functional with all Parkin? accessing
from the alley. The only fence proposed was a low brick carib in
color) retaining wall with a wood fence on top of it. This fence will
be along Dayton St. The building will be sided with 1"x 6" bevel
siding and 1"x 4" trim. There will be many new windows and skylights.
The siding will be off-white with the primary trim being dark blue and
the secondary trim being brown. The roofing material will remain as
it exists. Mr. Bowman indicated that the planting plan was well done
and would provide a pleasing environment with alternating plantings,
grass, and gravel areas. The wooden planter boxes also will accent
the overall landscape plan. The parking will be well screened from
neighboring properties. Two street trees will be needed, as well as
grass in the street planter area. The type of tree will be determined
by the Buildings and Grounds Department, but the trees are to be
maintained by the property owner. The lighting plan was very low key,
with one white globe lamp above the front door and two silver gray,
directed, flood lamps to light the parking area. There also will be a
barber pole on the face of building and an ornamental pole lamp at the
base of the front stairs. A picture of the pole lamp was shown.
The trash enclosure is a 3' high solid wood enclosure with gate, the
color matching the building. The electric meter is near the front
door but it may have to be moved. Two signs were proposed, one on the
front and one on the rear of the building, both to be wall mounted
wood signs. Sign colors will match the building colors. The allowed
sign area is 28 sq. ft. and that proposed was 20.25 sq. ft. The signs
met the Code requirements. The.Engingering Division approved the use
of the allCvway for guess to parking and backout space. A sample
board was displayed. MR. SELVIDGE MOVED, SECONDED BY MR. SPANFELNER,
TS_AUAQ""QBaQA1.AS SUBMITTED, WITH THE POLE LIGHT, AND THE DIRECTION
THAT THE BUILDINGS AND GROUNDS DIVISION BE CONTACTED TO SPECIFY THE
TYPE OF STREET TREES TO BE PLANTED. MOTION CARRIED.
There was no further business to come before the Board, and the meeting adjourned at
10:00 P.M.
ARCHITECTURAL DESIGN BOARD
Page 6 - September 2, 1981
August 27, 1981
MEMO TO: ADB Members
FROM: Dan Smith
Planning/Engineering
Inspector
SUBJECT: ADB MEETING/SEPTEMBER 2, 1981
The following items have received no comment:
ADB-55-81/S & S Sign Company
ADB-56-81/Steve Walter 44
ADB-59-81/John Delane
ADB-61-81/Pizza Hut
ADB-6-81/Art Furbush
ADB-62-81/Claire's Pantry
ADB-63-81/Rebecca Strom
ADB-58-81 FRANK TAYLOR
Review of site, elevations and landscaping for twelve unit
condominium at 1115 4th Avenue South. (RM-1.5)
The site plan as presented is acceptable to Engineering exceptcfor.one..Change.
A 18' driveway will be required in place of the proposed 16'. Also,
a sidewalk must be installed along 4th Avenue South to City standards.
At time of building permit application, a development plan must be
submitted showing all planned utility systems and public improvements.
A performance bond will have to be posted based upon the cost of
installation of the utilities and any public improvements.
ADB-60-80 TIME OIL COMPANY
Review of gasoli e service station and convenience store
at 22324 Highway 99.
The site plan is acceptable except for two changes. A 30' curb cut,will be
the maximum allowed on the Highway 99 entrance. Also, curb, gutter and
sidewalk will have to be extended along the south property line. A utilities
development plan, cost estimate and performance bond based on 110% of this
cost estimate shall be required prior to issuance of a building permit. Also,
Time Oil Company is required to sign a.covenant support.ing.any. future'.sidewalk
L.I.D. on Highway 99..-
ADB-63-81 REBECCA STROM
Review FT —site, elevations,.landscaping and signs for
California Concept's Hair Design at 533 Dayton Street. (BC)
The site design as presented is acceptable. The use of the alleyway for
access to parking and backout space is approved by the City Engineering
coffice. A utilities development -plan, cost estimate and performance bond
based on 110% of this estimate shall be required prior to issuance of
building permit:
DS/mt
(1—ftUIP-LIHM a 44.)o 140Y SEND PARTS I AND 3 WITH CARBON INTACT. -
. PMY PAK (50 SETS) V 469 . PART 3 WILL BE RETURNED WITH REPLY.-