Loading...
535 MAIN ST.PDF11111111111111 14173 535 MAIN ST "? C. 18913 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 * (425) 771-0220 - FAX (425) 771-0221 Website: www.d.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering August 24, 2006 Ms. Joan Archer Aria Studio Gallery e::M�5Mai�nStre�e Edmonds, WA 98020 RE: Lighting on Main Street between 5 th Avenue and 6 th Avenue Dear Joan, GARY HAAKENSON MAYOR Thank you for your letter dated August 22, 2006 regarding lighting on Main Street between 5th Avenue and 6 th Avenue. ; Yes, Michael Plunkett mentioned your concerns and desire for additional pedestrian lighting at our recent Citizens Advisory Transportation Committee meeting. City Staff is presently in the process of preparing the 2007-2008 budget for the Mayor to submit to the City Council. At this point, because the lighting proposal is not identified as a project in our adopted Capital Improvement Plan (CIP), our 2007-2008 capital budget submission does not include funding for pedestrian lighting on Main Street. To add your requested pedestrian lighting project would require that the City Council add your project to the City's adopted CIP and identify a funding source for the project. Because the City's CIP does not have any unallocated funds, this would most likely require the deferral of one or more other high priority projects such as street overlays, walkways and bikeways, ADA curb ramps, school zone improvements, roadway stabilization, downtown crosswalk repairs, or traffic calming projects. For your information, the Public Works Department and Parks Department are planning a project soon to remove and replace street trees on the south side of Main Street between 5 1h and 6th Avenues. Although it is preferable to combine projects (such as tree replacement with street light installation), as I noted above, funds are not presently available to include your request without "bumping" other projects. Noel Miller and I have discussed your requested project with Mayor Haakenson, and he has decided that because it is not currently in the CIP, he cannot include it in the 2007-2008 capital budget submission to the City Council ahead of the other priority projects that have already been identified. Including your project for funding in the budget would req'uire a City Council action. Incorporated August 11, 1890 I understand that you have also approached the Planning Board with your request. While the Planning Board is not in a position to take action on your request, an appropriate avenue for you would be to address your request to the City Council during the budget review public hearing process during the next few months. The City Council has the ability to amend the CIP and add projects into the capital budget they may consider to be a higher priority than those that are already identified. Thank you for your interest in downtown Edmonds. If you have any questions, please don't hesitate to call Noel Miller, Public Works Director, at 7710235, or me at 7710220. DAVID IC GEBERT, PE City Engineer Cc: Mayor Haakenson City Council Planning Board Noel Miller, Public Works Director Duane Bowman, Development Services Director Brian McIntosh, Parks, Recreation and Cultural Services Director August 22, 2006 From: Joan Archer Aria Studio Gallery 535 Main Street Edmonds, WA 98020 To: Dave Gebherdt A U11,; 2 Greetings to you Dave. I recently was talking with Michael Plunkett concerning the need for lighting on the East Main area of the Edmonds business district. I believe he mentioned our situation to you at the last transportation meeting in Edmonds. I spoke at the May meeting of the Edmonds City Council about our lighting issue. We (the business owners and landlords) formed a group and have had two meetings regarding this matter. I brought this matter to the council's attention at that time. Since May, I was able to get an approximate bid for the lighting costs in our particular area. This includes the purchase of lights and the costs to install. Noel Miller assisted me with these quotes: $25,000 for the cost of 10 lights; 5 to go on one side of the road, and 5 to go on the other side. Another $50,000 was estimated to install the lighting. I also spoke at the last meeting of the planning board, about this same issue. We are in dire straits going into the winter months without proper lighting in our area!! With all the new businesses filling the East Main block, and above 5th Avenue, we need to address this issue for safety and retail concerns. Our concern is that someone will fall and be seriously injured. Our other concern is that our businesses are supported with lighting to encourage customers, not just now, but in the winter months, when it is dark at 4 pm. Are you going to put our bid into the coming 2007 yearly budget? We believe it is a great need for the people in our community. Please reply to us as soon. Joan Archer, Business Owner Aria Studio Gallery 425 774-5811 DATE RECEIVED ` FPERIMIT PIRES CITY OF EDMONDS USE ZONE PERMIT NUMBER t CONSTRUCTION PERMIT APPLICATION F1077R��NE,O Jo 5 SUlITJfAJSTO ADDRESS P31A111V 151-1- INE1s -14 C--;,-4 /L—,v PLAT NAMEISUBDIVISION NO. "'i NO. UD LID NO. FEE S MINING ADDRESS PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP T­ su'm EXISTING — PROPOSED msp� si— REQUIRED DEDICATION— FT U.." �­I U" P-11 RKV R"­I CI CITY ZIP fta3d r;;;E g1l NAME METER SIZE I LINE SIZE I NO. OF FIXTURES P V REQUIRED YES 13 NO C3 ADDRESS REMARKS OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE CITY ZIP TELEPHONE NAME ENGINEERING REVIEWED BY DATE RES$ FIRE REVIEWED BY DATE 0 CITY ZIP TELEPHONE STATE LICENSE NUMBER EXPIRATION DATE CHECKED By VARIANCE OR CU — I SHORELINE OR A11111 M6-021 136 INSPECTION �67'23 NO BOND I, POSTED z Q PROPERTY TAX ACCOUNT PARCEL NO. 23,zq -25 731,�,- -7) ot, 44 V012 SEPA REVIEW COMPLETE I EXEMPT EXP x SIGN AREA AE;4 , PROP 12,:4 HEIGHT ALLOWED I PRIOPOSEF Z-1 41 /-14 NEW Ej PLUMBINIIMEIP-3'7 COMPL NCE OR ADDITION CHANGIAOF USE LOT COVERAGE ALLO D Z7 �:D REQUIRED SETBACKS (Fr.) FR ONT SIDE REAR PROPOS D ETaAC S (Fr.) E S 14EAR FRONT LJR SIDE E] REMODEL SIGN REPAIR GRADING CDS FENCE I _ X _FT) PARKING R �� LOT AREA REMARKS DEMOLISH IANK OTHER GARAGE Po RETANINGWALL FIRE SPRINKLER CAR FIT 'KERY FIRE ALARM RIC ITYPE OF USE. BUSINESS OR ACTIVITY) PLAIN: CHECKED 13Y �TJON OC GROUP UPANT 1z r I e-71r.'T NUMBER NUMBER OF ITICAL F 0 C 0 U WELL NO AREAS STORIES NITS NUMBER SPECIAL INSPECTION JAREA OCCUPANT REQUIRED [] YES LOAD DESCRIBE WORK TO BE DONE REMARKS PROGRESS INSPECTIONS PER U13C 108/FINAL INSPECTION REO'D 7� VALUATION $ CQ - Description FEE Description FEE Plan Check State Surcharge HEAT SOURCE GLAZING % LOT SLOPE % Building Permit City Surcharge PLAN CHEC�� _ _3 IISTED DATE Mechanical THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t: BE DONE ON PRIVATE PROPERTY ONLX ANY CONSTRUCTION ON THE PUBLIC 0 TC.) WILL REQUIRE Grading DOMAIN (CURELS. SIDEWALKS. DRIVEWAYS UEES'E SEPARATE PERMiSMSAIORN. Engr. Review PE MrTAPPLICATION: ISO DAYS PERMIT UMM I YEAR - PROVIDED W RK IS STARTED WITHIN 180 DAYS Engr. Inspection SEE RACK OF PINK PERMIT FOR MORE INFORMATION ;APPLIC - ON BEHALF OF HIS OR HER SPOUSE. HEIRS ASSIGNS AND SUCCESCIRS Fire Review Plan Chk. Deposit S N INTEARNETT. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF 2 EDMONDS WASHINGTON ITS OFFICIALS. EMPLOYEES. AND AGENTS FROM ANY AND Fire Inspection Receipt # -7 ALL CLAIM� 14" W FOR DAMAGE'S OF WHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY X FROM THE ISSUANCE OF THIS PERUIT. ISSUANCE OF THIS PERMIT SHALL NOT BE Landscape Insix Total Amt. Due 1 // — 9 DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE A 0 NOR LIMIT IN ANY WAY THE CITfS ABILITY TO ENFORCE ANY ORDNANCE PROVISION. Recording Fee Receipt N I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION GIVEN IS CORRECT; AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROvAL THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC* IN I ­,i­i.p­t.Wmgndbym4 TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL d F­ .. pmd, -d IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO FOR INSPECTION WORKMEN'S COMPENSATION INSURANCE AND RCYV 18.27. OFFICIA S N DATE SIG �O OR AGE DA;7NED (425) 4-2 - 771-0220 DAVE ATTEATfON EXT 1333 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE U TIF A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CER NT ORIGINAL -FILE YELLOW- IN�FECTC(R SECTION III CATE OF OCCUPANCY HAS BEEN GRANTED. UBC &X,62��7 PINK -OWNER GOLD-ASSESSOA 04/02 PRESS HARD -YOU MAK PIES GREEN -ACCOUNTING Al APPLICATION for The City of Edmonds SME SEWER PERMIT NEW CONSTRUCTION 0 REPAIRS [j EASEMENT No . .......................................... OWNER...... . ...... 6�� ------ --------- * ----------- ***** --------- CONTRACTOR ................. -------------------------------------------------------------------------------- PERBUT No . ...................... AI)DRESS --- - ----- %St .............................. ...................... LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ 0 0 v NAMEOF ADDITION ......................................................................................................................................... ;�� 7J kppro,�d: DATE. ................................................ By ...................................................................... �<,>J, A I D 1i El 5-r L4 D GA L. L 8- P, Y "ITY OF EDMONDS RU�LDING DEPARTMENT ARIA FA 11 DATE: Aj -L is Cry Ir O�:c,-IAL-- F�=—RMIT NUMBER PPROVED 3LPG. JUN 2 7 2002 PERMIT COUNTER I 1 1 wil, J, t X., , "4 1 1 11111111111 w1iffila, j " � f"Y" -------- --- REET - FILE E RECEIVED JUN 2 8 2002 13UILDING DEPT. SLD6r C016IR white cloud