Loading...
536 WALNUT ST.pdfv- Olt 6. AGENDA ADB-96-96 NEW SIX UNff MULTIPLE FAMILY BUILDING James Irwin 400 Howell Way (Final Approval) sm A . . . . . . . . . . M........... ADD-96-101 NEW FOUR UNIT MULTIPLE FAMILY BUILDING Mchel Construction Inc. 536 Walnut (Final Approval) M. -X" OR, PRA 7. DISCUSSION OF ITEMS APPROVED BY STAFF WrMOUT ADB APPROVAL There was no discussion of this item required. 8. ADJOURN Ardaechual Design Bond Sepkmba4,1996 Pose 2 0 Z :C Z4 UJ W -J UO W -J F-, U) LL LU 01 LL D ,n 0, UJI Z Im LU, L) 0 0 W LUI F- U- 0 Z LU Cn 0 Z 0 to ADB-96-101 REOUEST FOR FINAL APPROVAL OF A NEW FOUR UNIT APARTMENT BUILDING A. Applicant/Property Owner Architect/Representative Michel Construction Inc. 8022 212th St. SW Edmonds, WA 98026 B. Site Location: 536 Walnut C. Introduction: The applicant is proposing to construct a new four unit apartment building on two existing lots. These lots currently contain one single family residence. The applicant is proposing to remove the house. D. Background: 1. Zoning: The property is zoned Multiple Family Residential, I unit per 1,500 square feet (RM 1.5) which allows one dwelling unit per 1,500 square feet of lot area. The subject lot area is approximately 8,250 square feet. Thus four dwelling units are allowed for this project. 2. Environmental Review: The proposal of four dwelling units is categorically exempt from the State Environmental Policy Act (SEPA). However, the proposal will require grading of more than 500 cubic yards of material, and therefore is not exempt from SEPA. The applicant has submitted an environmental checklist which has been reviewed by the City. The City has issued a determination of nonsignificance (DNS). Therefore, the applicant and the City have completed the SEPA review process. 3. Issues: Design of the building, site, and landscaping have all been addressed by the applicant in their proposal, and the Architectural Design Board must determine the appropriateness of the proposal. E. Staff Analysis: 1. Building Design: The applicant is proposing one new building for four units. The parking will be under the proposed building. The applicant has proposed a roof design with hip end roofs and gable dormers for visual interest. Each elevation has modulation and visual interest, including a variety of materials, and well defined entrance on the north side. �E 0 z F- U) in Lul W LL W 0 2 � CE LL Ln Bi 0, :r Lui z LU UJ L) 0 W z LU U) 0 z oil X� The applicant has proposed lighting along the walkway on the east side of the building. The applicant has not indicated the type of the lighting. c) Colors: Light brown is proposed for the dryvit portion of the building. Medium brown is proposed for the textured LP portions of the building with a yellowish brown for the trim, and dark brown for the roof. d) Signing: No signing is proposed. 2. Site Design: a) Access / Parking: The proposed development requires the installation of 8 off street parking stalls. Seven of these stalls will be provided under the proposed building with one parking stall located in the southwest comer of the site. Pedestrian access will be provided directly from the street. b) Landscgping: The applicant has proposed a wide variety of landscaping throughout the site which includes ground cover, lawn, shrubs and trees. The landscaping on the street side and on the cast side appears to provide effective screening of portions of the proposed building. The applicant has not proposed any landscaping on the west side of the development. Since this area is adjacent to the vehicle drive aisle, the Community Development Code requires a five foot landscape buffer. The Code gives the ADB the discretion to modify or waive the requirements of the landscape ordinance. 3. Technical Review: a) Engineering Division • On street parking revisions and signage will need to be shown. • A site plan that has been stamped by a Professional Engineer will be required to be submitted and approved by the City Engineer. • Civil Engineered Drawings must match the architectural drawings. • The project must comply with storm water quality and quantity requirements per Ordinance 3013. Drains in underground parking garages are to be routed to sanitary sewer system. � • Provisions for power transformer to provide power for elevator must be made. Pole mounted transformers are not allowed. 2 0 i-43 ADB-96-3 Minimum 7 feet of clearance is required between the building overhang and the driving surface below the overhang. Parking plan will be required to meet the requirements of the ECDC. b) Building Division 0 Compliance with the ADA requirements must be met. 0 Civil Engineered Drawings must match the architectural drawings. C) Parks and Recreation Division With the proposed plating of 7 prunus trees along the sidewalk, no additional street trees are recommended for this location. d) Public Works Division 0 Curbing and sidewalk must be replaced as necessary. F. Summary: Staff believes that the Architectural Design Board can find that the proposal is supported by the ADB design criteria and the design related policies in the Comprehensive Plan. Therefore, staff recommends the Architectural Design Board approve ADB 96-101. Attachments: 1. Vicinity Map 2. Applicant's declarations, elevations and site plan -i dw MM IM I 25XIII 39 gill= I Ell Nall min I .............. .................... kr.L�