Loading...
538 MAIN ST.PDF11111111111111 11959 538 MAIN ST fit jwepnn Ati Wr-OaCh*le*z 7 4- (a wX Pe re ,o PLANNING DATA New Commercial / Multi -Family Projects Name: MOLA Date: Site Address: C3,61b Math Plan Check #: BLD - /Z007- QG37 Project Description, evitkn L4�tk opua ot-v, &&0j"t (Vif& TTI a C, [or Phl'ilf. b4t C-f dPr,- Re Use(s) Proposed: Allowed Use: CUP File Number: To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES / NO) Reduced Site Plan Provided: (YES / NO) Zoning: Bb- I Map Page: iN Comp Plan Designation: Corner Lot: (YES Flag Lot: (YES 00 ADB File Number (datewaived): 6/2.101 Lot Area: Plans Match ADB Approved: (YES / NO) Shoreline Required: (YES (NO Critical Areas Determination #: El Study Required ? El Waiver SEPA Determination: 14 Exempt El Needed (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3 APO List with notarized form). Required Setbacks Street: Side.- I Rear: ActualSetbacks Street: Side: Side: ear: Lot Coverage/FAR Required: Lot Coverage5AKIP�rovided: Lot Coverage/FAR Calculations: BuiWng Height Datum Point: Datum Elevation: Maximum Height: Actual Height: Subdivision. - Lot Aggregation RequiredZ_ Landscaping Landscaping Matc s ADB Approved: Landscaping Bid Provided: (YES / NO) Bond Amount (100% Bid): Plan Review By: PLANNING DATA STREET :FFI7LE:J] New Commercial I Multi -Family Projects Commercial Parking Analysis Business Name Type/Use Parking Tenant Required Ratio Area Parking Total Parking Required: Total Parking Provided.- Millti-Famio, Parking Anal is # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1.2/D.U. 1 Bedroom 1.51D.U. 2 Bedrooms 1.8/D.U. 3 + Bedrooms 2.0/D.U. Total Parking Required. Total Parking Provided. Plan Review By:Anv-� hhlo,�,4 _:;�o WASYEP Rock /Co.F I / - /Z /_�5 16 A6 Ell 0 cc CE) P4,4)(o, s) Tvt V-, \J V-k 0 0 DATE: 2-- 2-- al MEMO TO: Building Division Communitv Development Department FROM: Engineering Division Public Works Department SUBJECT: 5 3S MA IN S-7 After review of the.subject Building Permit application, we have the following comments: 1. Connection to City water system required. 2. Connection to City sanitary sewer system required. 3. Right-of-way Permit required for any work on City property. 4. Driveway slope not to exceed 14%. 5. Backwater valve required if downstairs plumbing is below elevation of upstream manhole. . .... .. : ..... 1 6. Water and sewer lines to be separated bv 10 foot minimum. Signature