543 MAIN ST.PDF11961
543 MAIN ST
DATE: 2— 7-9!f
14EMO TO: Building Division
Communitv Development Department
FROM: Engineering Department
SUBJECT: J-;�4 3 /10//V/ S�--
After review of the subject Building Permit application, we have
the following comments:
1. Connection to City water system required.
2. Connection to City sanitary sewer system required
3. Right-of-way Permit required for any work on City property,
4. Driveway slope not to exce-ed 14%.
5. Backwater valve required if downstairs plumbing is below
elevation of uostream manhole.
6. Water and sewer lines to be separated by 10 foot minimum.
7. Builder/Owner responsible for containing all temporary run-
off and erosion on site and may not impact neighboring
properties in any way.
ture
7 75'
M
....... FEB2`91984
LOYELL SAULEAKF"' ND IF— /'Ji
&
ASSOCUTES, INC-
n"EYORS - DEVELOPMENT CONSULTANTS PLANNERS
23108 . looth W. EDMONDS, WA 98020 775-1594
,5 r ryi r(:qf Y I C�j
C
1'.3 t a pe
Gol. 4 Ij 1'. v e_ Ir tp—j io
/*
'Ji * 7
A o-F Si'�Q 7 70 0 Isf
.2-2-64- S -F (9 740
A re C"
70 6 F S 2 Jr
Oil (2-2-94) -k 0. 21 5( 7W (a)
C
o,4-0
R&A �i 04� V0.10C;
fy C
tji Ti'm*e- Concenlro-flart Tc.
Tez,
/'x 60) -f /0 rn,'
Ade. ve i 'tj' riew
th A)-. g4ji' Ch&rt re. fk r 1%
1.7
C
Ail
M
1773
LOVELL. --..A-UEkLATND
17.1 1 73
2- S
ASSOCTATES, UqC.
SURVEYORS - DEVELOPMENT CONSULTANTS - PLANNERS
23108 100th W. EDMONDS, WA -:48020 - 775-1594
Deve-lo D r6k fkI te- m
T
A
C on r-. 3 10 6,5-F
3
0 0 5 F
1,5r
TO tol,
(31
0,76
1700
A c k 9- X RcAno-f-�-
Coq�-.
15 C47
-0 A
C." e
171 c e- tAf r_,o Mj ;I
T-Z -Z5 4 (:Zz",Ky
7= 7-5' 1
30077-
4a 4 T
T
7-
LOVELL t SAUERLAIND r-. 1 -7
ASSOCUTES, M.
SURVEYORS - DEVELCPMENT CONSULTANTS PLANNERS
23108 - 100th 'N. EDMONDS, WA 98020 - 775-1594
z -Z"
c 5 7 0 4
89 LF 1,5 cmp 108,0
IZ7LF 8
t77,�55F;
E�ja 0 p j--Fj c
Q-
A ll.w. 0, 15
2.
64.4 ff /s
1.,5 (o -f�
/(C ad
462g
Jec%
0 0 Z 4 13 8 Isf, 3, 4 74"
t4c.(A
4 U-4
da:
too i� -1
Q. -7 (5 2-
LOVET I QATTVDI AXTn
ASSOCUTES9 EW.
SURVEYORS - DEVELOPMENT CONSULTANTS - PLANNER'
23108 . 100th 'N. EDMCINOS. WA 9?0".0
ec-k ov* �Fi r- 6 1 Z- Q-
A 3. S 4 (o,& im
c T2---
7- 4 6 0.6 2-)[( 6 4,+) 1. S6,])
0,
Ch C-A ccpc, r, iI r /2 CA4P
12- C M P
n 0. 02-4)
P,
if EDMONDS LA�-
JR. HIGH
0
'SCHOOL
coo
to
0 0
"'0007
Track 91 Football F;eld
LL, I Ir
40- I;D,
Go) s. f I
\0 0—
-j— T—,
--SELV-IST.
CIO
04
12-
00
C;j
/46
EDMONDS ELEM.
SCHOOL
m
�A
"Is
N
U)
N,
0
oz
<
U
0
Ix
IL
0
u
w
u
LL
16—
LL
w
0
LU
ir
4\j
'111-v
CITY OF EDMONDS
ASSET INFORMATION SHEET
2rNEW
ADDITION
RETIREMENT
"PURCHASE ORDER NO. -
PURCHASE ORDER DATE
COST
ASSET NO. - 420 56—/V—O
ADDITION TO ASSET NO.
*PROJECT NUMBER -Z,) Z:-�49,-S-2
f.�
PROJECT COMPLET1014 DATE
COST
B.A.R.S. ACCOUNT NO.
ESTIMATED LIFE
INITIATED BY DATE APPROVED BY
"SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST
*SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT
ACCOUNTING ONLY
2 ZDEPRECIATE
MONTHLY DEPRECIATION AMOUNT
ANNUAL DEPRECIATION AMOUNT -
0 G.L. ENTRY
REFERENCE
DATE
VERIFIED BY
PROCESSED
BATCH NO.
INITIAL
(tnp
DEPARTMENT FILE
I
rn
-1
The City of Edmonds
Side Sewer Drawing
EASEMENT NO . ...................... .................. - A
10.
NEW CONSTRUCTION REPAIRS E LID NO - ------------------ ASMT. NO - ------------------
OWNER ...... JO-HLN ...... RO-Cwx --------------- 1-1 ---------- ....... ------ CONTRACTOR —'RU-15-S ..... 10-HIA-SOPA ........................ .. PERMIT NO. -771-45-
JOB ADDRESS - 5-43 --- InAm ---- S ------------------------------ LEGAL DESCRIPTION: LOT NO. Z.) --- A-2-2 - --------------- BLOCK NO. -D --- -------------------
------ I ----------------------------------------------------------------------------------------------- — EDMONDS ----------- --
------------ - T-- R- --- EA--TMENT PLANT.
NAMEOF ADDIT'ION -------------------------------------------------------------- -------- L.: .......
M
0
fn
27'
r
ACCZSSFOLE
W.C.O. WVE
10" 1511T Wlll—�
so, Oftsavem-r
,543 M AIN
PWW-000 1 - 11175 (R EV. 11178)
LjOAOING
RAMP
3.5*Dp
,W. >&,.
P&ACR P�q.�o
it
15'
27--j (;I
4'op. 7
&'C-.Q.W9F-
xcom-b
Saw NopkTH
Approved:
TYWiNt- 5-7-84
DATE ..... 8 --------------
By, Z. ----- k—
r
d&
rn
ro
Z
0
U
W
go
0
(D
0
CITY OF EDMONDS
PUBLIC WORKS DEPARTMENT
RIGHT - OF - WAY CO T TION---KRMIF FC
A.,*Add cin . t f C-r t
ruU
q
0 Owner: �;7� C A -
Name
wing Address
City, State, 21 Code
9 Contractor:
-I'VAI Address
d 60S k
City, State, Zip Code
R E C E I V E 0
MAY, 3 1984
Permit No. 'Ll —
Issue Date 6-1
• Permit Issued To:- lAss 7YQ1y)son
I
• Type of Work tobeDone:.)'i1,",fa11 %:-�Jde
I-S e Vi ED r
0 Work in Connection With:
0 ub or Plat 11 �jngle Family
Ve��Comml. / Ind. 911>'pr. Condo.
0 Pavement Cut: E20 Yes 0 No
State License Number
::2 5�' :5 - 0 003
Tefepkone Number
* * NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE * *
B. APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless
from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made
against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal
proceedings including defense costs, court costs, and attorney fees by reason of granting this permit.
Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year
following the final inspection and acceptance of the restoration by the Engineering Division.
Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed, at
which time a debit or credit will be processed for issuance to the applicant.
Work is to be inspected. Restoration to be in accordance with City Code. Traffic Control to be in accordance with Traffic
Section of City Code. Str be kept clean at all times. A 24 - hour notice is required for inspection by Engineering.
Call 7ph/�5p,6/ exten 2,2,
771-3202
I understand that thi per *t u., .,�e aVailablg.4t the job site for inspection purposes at all times.
Date
or Agent I " I
THIS PERMIT MUST BE POSTED AT THE JOB SITE FOR INSPECTION PURPOSES
CALL DIAL - DIG PRIOR TO BEGINNING WORK
C. Issued By: 07 r10 IIQA
Time Authorized: Void after 1,909 days
Special Conditions:
Ammendments:
Permit Fee:— '*' -Ro' Do
Security Deposit: —Lo F. 0 0
Receipt No.:
.00p,
'_2 &
Street Cut Dimensions
mir)k = /61- DO
* * NO WORK TO BEGIN.PRIOR TO PERMIT ISSUANCE * *
Eng. Div. December 1978
FIELD INSPECTION NOTES
(Fund. 111 - Route conv to Street Dent.
rnmmpni-q-
Diagram:
Contractor called for
Work Disa.pproved By:
Work Approved By:
Inspector:
inspection
Ye S No
Date: Bv: Date:
Date:
Enq. Div. December 1978
TY OF EDMONDS
I PUBLIC WORKS DEPARTMENT FOR INSPECTION CALL Permit H?
2 Ext. 270 Issue Date
SIDE SEWER PERMIT A N3
AWAW,MW,MW,MWAWAqVMW,M i
Aw
PEP -MIT MUST BE POSTED ON JOB SME *7r
1. Address*of Construction -4 �-- n
�fj Property Legal Description (include all, easements)
,7 L o+-<, ? i � �,) a, , -;� I n o- k 1) 1 P., 1 , 0 � E- j q,
6iZ Single Family Reside'nce Mult'i-Family No.
co � F
6,.
co
Commercial
Owner and/or Builder
Contractor & License No.
Invasion into City Right-of-Way:,�-'No
way Construction Permit Required - Call
excavation) .
C7)-L-
TREATMENT PLANT
of Units �2--
Yes t�-' (If Yes Right -of -
Dial Dig (ANY-43AH) before
I -BOO-424-5555
7. Cross other private property: Yes NoL,""' Easement required -
U attach legal description and county easement number.
READ THE FOLLOWING AND SIGN:
a4
P4
a. Property owners must obtain a permit to install side sewers on
their property. A licensed side sewer contractor must be employed . to
construct side sewers in the public' right-of-way.
b. The side sewer contractor assumes full reponsibility for each
installation for one year.
$4 C. Commercial establishment requires a minimum of a six inch (6")
P4
z side sewer line.
0 d. Side sewers may not be installed closer than thirty inches (30")
U to any structure.
W 0
e. Side sewer lines must be laid at a minimum grade of 2% (1.15
0 and maximum grade of 100% (450). 0
f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 1001 along sewer 'line run.
j. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due.to poor compaction of fill.
k.. Side sewer must be left uncovered un 1 inspected and approved
by the City.
1. inspection during normal working h /o ly. Two (2) working
S
days noti d.
DATE: L/ o;/1
/-7 Y-14&t I have read
f'
,and s t!
CVk
hil-I comply with the above
. PERMIT FEE: DISAPPROVED BY: Date:
cn I , B 4
tj i �� � (2 /70 r-ge- 0 0 —Date:
�ONN TION FJE;: APPROVED By:v&�2 Date:
0
44
PERMIT MUST BE POSTED ON JOB SITE
FEB 2 9 1984
GROUP F007,111C.
19502 - 56th Avenue West - 206 775-4581
Lynnwood, Wachington 98036
S7
JOHN ROCK,RETAIL/APARTMENT-BUILDING
STORM DRAINAGE ANALYSIS
.S
4� 8 -4515
3
WAs 9/15/83
p
0, 1 A
NAL
STJRVF,YTN(' P. NGT N F. F. R Mr. PT.ANNTNr. M A N1 A r P N-7 T-'NIT
c—_ As Ae_ WOOO,
6 4�� L
V
Te_ +
TZ_
1.74
o, 57
el -I 115),
4�) e-Z.4-- ef
(A*,.) CL Co
T .4
z Z. (,!:Z. I XFV e
4::.A, e.
o C�pz
0. 0 Z�� 7-
_. - � , /q4,
---------- I..
TT
'tJ'
e4e_
e L.-c-,ve.
AN
Tva jp=l�. Y_,�- e I r I.An
4
Ay-2-40A evt 6-_I*'[A.";'7'�..
V.1
C-1
PIP
Oro. "A
"A Wn-l-
I A-71 Z... 4.7.-
------ --------- &7FF-,,:i I. T-a W-i PeTAtNF_i>,..
..law 0. 0.;5,zz- 0. Zcrz4,
U
9 Q 9 1 Y.E..D
ROBERT E. YOUNG ASSOCIATES JAN 4 198Z
architecture and planning
WX OF �DMONQS
1110 north 175th street (206) 542-3192
seattle, washington 98133 363-6512
December 30, 1981
Mr. Dan Smith
City of Edmonds
Public Works Department
200 Dayton Street
Edmonds, Washington 98020
Dear Dan:
Re: 543 Main Street
With regard to our recent telephone conversation, enclosed is a
letter from Group Four to Mr. David West of QC Development outlining
the options which they are considering for handling the storm drainage
at the above site.
We will also consider the option you mentioned concerning collect-
ing the storm drainage in a dry well system, if this proves to be
feasible.
If you have any further questions, please call.
Sincerely,
RO?BERT YO GG
REY: s j
encl.
(31 GRO, U-P FOUR, Inc.
19707 44th Avenue West * 206 775-4581
Lynnwood, Washington 98036
December 16, 1981
Mr. David West
Queen City Development Co.
1155 No. '130th St.
Seattle,� WA. . 98133
Re: Lots 21 & 22, Block D
City of Edmonds
Our File No. 81-3129
Dear Mr. West:
This is to inform you of the general storm drainage situation
regarding the subject lots. The nearest system in City streets is'
in 5th Ave. N. midway between Main St. and the alley to the north,
approximately 370-feet away via the alley and 350 feet in Main
Street.
There is a storm system in the condominium development known as Bel
Eyre to the northwest. This system is accessible if proper
easements are either existing or can be obtaineo. Using this system
would entail an analysis of their engineers calculation to see if
any modifications would need to be made if you were to connect to
it.
If you have any questions regarding the above, please call.
Sincerely,
; 0, R:
. .1 25 ; 0
Vern Bower
VB/ jh.
SURVEYING ENGINEERING PLANNING MANAGEMENT
p.
irA'E �)Mb\ FILE
CITY OF EDMONDS SITE PLAN
BUILDING PLANS (3): ELEVATIONS
APPLICATION LANDSCAPE PLAN V"'
to the
ARCHITECTURAL DESIGN BOARD ENVIRONMENTAL DATA5S-CO RECEIPT #;A,�3C)_7 D
SIGN EXHIBITS FEE RECPT #
PLAN MODIFICATIONS-T.0 FILE NUMBER:
OWNER /REPRESENTATIVE a.6. V�_\jF L
.A
HEARING DATE b- I C4,bA
I
PHONE-�, 6 5 - '?_� AL -2, p
ADDRESS- 11�5iS L1. 1-5p T'l —ZIP CODE 9 B 1; 2,
ARCHITECT /DESIGNER tbVqF_&1 4A PHONE tf54-L-:j?1
PROPERTY ADDRESS_�54:,Z, 0 p!�4 %ZA ZONING
LEGAL DESCRIPTION— r):r_-_7 Z t 'LL f-p 1, c, W_ V r2 P 'ab m b r?e.-
AC(,D�plpJ4 -:I-t) F_L-)hT- :r AE�F; n� 1LF_e_6MF_F2 1�1 VOL, br= �IAZ�3
?A.Ai�C-7 1-7b A�4(9 zq or- -nAF_ �&.vorrnf_ 6n.
PLAINS SUBMITTED FOR APPROVAL:
1. Building Plans - Preliminary V11 Final
Site Plan V, Landscape Plan V11 Elevations v'
2. Sign Elevations Site Plan Landscape Plan
3. Modification of previous approval
EXISTING USE OF PROPERTY
DESCRIPTION OF PROPOSAL 00 oc).& vyrra Two -
APPROXIMATE DATE WORK WILL BEGIN ON PROJECT
ESTIMATED ' TIME FOR COMPLETION OF WORK.
RELEASENOLD HARMLESS AGREEMENT: The undersigned applicant, his heirs and assigns, in
consideration for the City processing the application agrees to release, indemnify, defend and
hold the City of Edmonds harmless from any and all damages and/or claims for damages,
including reasonable attorneys; fees, arising from any action or inaction of the City whenever
such action or inaction is based in whole or in part upon false, misleading or incomplete
information furnished by the applicant, his agents or employees.
PERMISSION TO ENTER SUBJECT PROPERTY: The undersigned applicant grants his, her or its per-
mission for public officials and the staff of the City of Edmonds to enter the subject
property for the purpose of inspection and posting attendant to this application.
C")
(Signature of Applfc�nt)
APPLICATION
for
The City of Edmonds SEDE SEWER PERY[IT
NEW CONSTRUCTION E] REPAIRS 0 EASEMENT No . ..........................................
OWNER ........ .................................................................... PERMIT No . ......................
.4 . .... ................... CONTRACTOR ..............................
ADDRESS 122.6-4-6-1 ... Zt . . ..................................... ........... LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................
4
0
NAMEOF ADDITION .........................................................................................................................................
A pro,
DATE................................................ By ......................................................................
ENVIRON�IENTAL CHECKLIST
Introduction: The State Environmental Policy Act of
1971, Chapter 43.21C, RCW, requires all state and local
governmental agencies to consider environmental values
both for their own actions and when licensing'private
proposals. The Act also requires that an Environmental
Impact Statement (EIS)'be prepared for all major actions
significantly affecting the quality of the environment.
The purpose of this checklist is to help the agencies
involved determine whether or not a proposal is such a
major action.
Please answer the following questions as completely as
you can with the information available to you. Where
explanations of your answers are required, or where you
believe an explanation would be helpful to government
decision makers, include your explanation in the space
provided, or use additional pages. You should include
references to any reports or -studies of which you are
aware and which are relevant to the answers you provide.
Complete answers to those questions now will help all
agen.cies involved undertake the required environmental
review without unnecessary delay.
The following questions apply to your total proposal,
not just to the permit for which you are currently
applying br the proposal for which approval is sought.
Your answ�rs should include the impacts that will be
caused by'your proposal when it is completed, even
though completion may not occur until sometime in the
future.- This will allow all agencies involved to complete
their environmental review now, without duplicating
paperwork in the future.
NOTE: 'This is a standard form being used by all state
and local agencies in the State of Washington for various
types of proposals. Many of the questions may not apply
to your proposal. If a question aoes not apply, just
answer it "not applicable" (NIA) and continue on to the
next question.
ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of Proponent
2. Addr es s and Phone Number of Proponent— f�o rW
q8t2
'�2 \Alr
3. Date Checklist Submitted -F,> F
4. Agency Requi ring Checkl ist (f-- I -rY nc-
I
5. Name of Proposal, if applicable
6. Nature and Brief Description of Proposal (including but not limited to
its size, -'general design elements, and other factors that will give an
accurate understanding of its scope and nature:
.K A Ir - k 1-1 - " . .
OOM
r
7. Location of Proposal (describe the physical setting of the proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other information needed to give an accurate under-
standing of the environmental setting of the proposal):
A, N
1 115 6 X =E402 Or=
SAL
8. Estimated Date -for Completion of the P
roposal W,
9. List of all.Pemits,*Licenses, or Government Approv'als.Required for all
Proposal (federal, state. and local — including rezones):
or-
10. Do you have any plans for future additions, expansions, or further
activity related to or connected with t.-his proposal? If yes, expla'.n.
Do you know of any plans by others which may affect the. property cover.,
by your proposal? If yes, explain.
0
12. Attach any other application form that �as been completed regarding th;'
proposal; if none has been completed, V�.t is expected to be filed at
some future date, describe the nat,.ire �.'7 suci application forr.;.
B. ENVIRO.NME14TA.L...IMPACTS (Explanations of all "yes" and "maybe" ans . wers are required).
YES
MAYBE NO
1. Earth. Will the.proposal result in:
a. Unstable earth conditions or in changes'
in goologic'substructures?
b. Disruptions, displacementsi-compaction
or overcovering of the soil?
c. Change in -topography or ground surface
relief features?
'T'he
d. destruction, covering . or modifica-
tion-of'any unique geologic or physical
features?
e. Any increase in wind or water erosion
of soils, either on or off the site?
f. Changes -in deposition or erosion of
beach sands, or changes in siltation,
depo ' sition or erosion which may'modify ---
the channel or a river or stream or the
bed of the ocean or any bay, inlet or
lake?
Explanation:
1�1 - �FXCA.VATJDW W/LL 9. F_ =Ea U I
P_9D :rRF,
2. Air.- Will the proposal result in:.
a. Air emissions or deterioration of
ambient air"quality?
b. The creation of objectionable.odo'rs? X
c. Alteration of air movement, moisture
or temperature, or any change in.climate,
either locally or.regionally? X
Explanation:
3. Water. Will the proposal result in:
a. Changes in currents, or the course
or direction of water movements, in either
marine or fresh. waters?
b. Changes in absorption rates, drainage
patterns, or the rate and amount of sur-
face water runoff? X
YES MAYBE NO
c. ' Alterations' to the course or flow
of flood waters?
d. 'Change in ihe�amount of surface water
in any water body?
X
e. Discharge into surface waters, or in
any alteration of surface water quality,
includi ' ng out not limited to temperature,
dissolved oxygen or turbidity?
Y,
f. Alteration of7the direction or rate
of flow of grou.n.d waters?
g.. Change in the quantity of ground
waters, either through direct additions
or withdrawals, or through interception
of an aquifer by cuts or excavations?
X
h. Deterioration in ground water quality,
either through direct injection, or through
the.seepage of leachate, phosphates, deter-
gents, water ' borne virus or bacteria, or
other substances into the ground waters?
A
1. 'Reduction in the amount of water
otherwise available for public water
supplies?
X
Explanation:-
jL� EA ---\Af 11, L 466, D.W r)I2A,:V_F_
41 1�3 f IF— F-0 141, V N
D ffi�( A.0
F, �;dzzLtA-
4. Flora. Will,the proposal result in:
a. Change in the diversity of species,
or numbers of any species of flora (in-
cluding trees, shrubs, grass, crops,
microflora and.:aquatic plants)? y%
b. Reduction of the numbers of any
unique, rare o�- endangered species
of flora? X
C. Introduction of new species of
flora into an area, or in a barrier
to the normal replenishment of exist-
ing species?
d.- Recution in acreage . of any agri-
cultural crop?
Explanation:
f:�_ X I �v T I q 4 D ?_�A AAA e97-A L -10���
WWADVII W
-3-
5.
Fauna. W111 the proposal result in:
YES MAYBE NO
a. -Changes.in the diversity"of species,
or numbers of any species of fauna (birds,
'reptiles,
land animals including fish and
shellfish, benthic organisms, insects or
microfauna)?
X
b. Reduction of the numbers of an'
y
unique, rare or endangered species
of fauna?
C. Introdukt"lon of new speci I es of
fauna into an area, or result in a
barrier to the migration or movement
of fauna?
X
d. Deterioration' to existing fish or
wildlife habitat?
Explanation:'
6.
Noise. Will the propos4l increase
existing noise levels?
Expl . ani . t . ion: 66
C-T K. U �-�j 10
7..
Light and Glare. Will the proposal
produce new light or glare?'
X
Explanation:— T14E, A012IT10a OE
11
I C LO VE, :MIF-I F--'C2 S 'YA Y LI
!Siku L r)
12 U C- F- A-P�iy �:PVEA�2F- LA IF-
8.*.Land
Use. Will the proposal result
Tn the alteration of the present or
planned land use of an e�rea?
Explanation: -Tj4F_ �_^t4-p is
t F= fTA
-
9.
Natural Re�ources. Will the' propo�al
result in:
a. Increase in the rate of use of any
natural resource?. - . X, .. . ...
b. Depletion.of any nonrenewable
natural resource?
Explanation:
10.
Risk of Upset...,- Does the proposalinvolve
a risk of an explosion or release of hazard-
ous.substances (including. but not limited
to, oil, pesticides, chemicals or -radiation)
in-the'event of an accident or upset condi-
tions?-
Explanation:
YES MAYBE 'NO
11.. Population'.' Will the*proposal alter the
location, distribution,. density, or growth
-rate of the human population*of an area?
Explanation:—foup, I e:cm F-a;:S2 (E;,MN L 1A W I I. L
g:f.MnVEp Ag2 9,ULAC-F12 F:2�c :r\/Vo
AZK:r_�d FA I: _U6(:,22
112.- '.11ouls2inE.. Will the proposal affect existing
No —using, or'create a demand foradditional'
housing?..
Explanation:- A&DM F-
13. Transportation/Circulation. Will the pro-
posal'result in:
a. ..Generation of additional vehicular
movement?
b. -Effects on existing parking facili--
ties, or demand for new parking?
c. Impact-upqn existing transportation
systems?
d. Alterations to'present patterns of
.circulation o� movement of.people and/or
goods?1.
X
e. Alteratiogs to waterborne, rail or
air trafflcl
f. Increase in traffic hazards to motor
vehicles, bicyclists or pedestrians?
Expl anati on:
A1701TIOI-4 OE gT
!2�JE� W/L1, V59AL-*
MOM C- A 1 T_ F, - 12 U � I :J:�J & 12A -e
'net --- — — a
It
ff-OtA. -rk, :f_1 -ry
-5-
YES
14. Public Services. Will the
proposal have
an'effect Upon, or result in a need for
new or.altered governmental services in
any of the following areas:
a. Fire protection?
b. Police protection?
C. Schools?
d. -Parks - or' -other" recreational
facilities?.
e. Maintenance 6�!p6blic facilities,
incTuding roads?"''*
f. Other governmental services?
Expl.anation:
MAYBE NO
X
15. Energy.�� Will the proposal result in:
a. Use''of substantial amounts. of fuel
or energy?
b. Demand upon existing sources of
ener gy-*, or.requirt'the development
of new -sources of energy?
�X
Explanation:
16. Utilities. Will the proposal result in
a neeJ76'r new systems or alterations to
the following utilities:.
a. Power or natural gas?
b.. Communications systems?
c. Water?
d. Sewer or septic tanks?
e. Storm water drainage?
f.-Solid waste and disposal?
Explanation:
-6-
YES MAYBE NO
17.
Human'Health. the proposal result
An.the creation of any health hazard or
potential healt.h hazard (excluding
mental health)?.
Explanation:
18.
Aesthetics. Will the proposal result
in the obstruc*.ion-of any scenic vista
or view -open to ) the public,: or' will the
proposal result in the creation of an
aesthetically offensive site open to
public view?
Explanation:-
19.
Recreation. Will the proposal result
in an impact upon the quality or quan-
tity of existing recreational oppor-
tunitie.s?
Explanation:
20.
Archeol6gical/iiistorical. Will the
proposal result in an aTteration of
a significant archeological or his-
torical -site, structure,,'object or
building?
Explanation:
C-. SIGNATURE
I, the undersigned., state that to the best of my knowledge the above information is
I
true and complete..'.It is understood that the lead agency may withdraw any declaration
or non -significance that it might issue in reliance upon this checklist should there
be any willful'misrepresentation or willful lack of full disclosure on my part.
PROPONENT:,�,,
-7-
cr
L
RULE ENGINEERING A PUBLIC WORKS
PROJECT
REVIEW
CITY OF EDMONDS
CIVIC CANTER * EDLAONDS. WASmiNGION 98020
SINGLE FAMILY HULTIPLE COWERCIAL
PROJECT NAME
CONTACT NA!'iE TELEPHONE NUMBER
ADDRESS
ACCESS SLOPE AND VEHICLE ACCESS
DRAINAGE PLAN
STREET FILE
LEGAL DESCRIPTION VERIFICATION
QUIT CLAIM/DEDICATIONS
EASEMENT - PUBLIC/PRIVATE
z CALCULATE SEWER CONNECTION IF NO LID f
R -
Lu
w STREET PAVING REQUIRED
0 CURB AND GUTTER REQUIRED
z
uj SIDEWALK REQUIRED
CURB CUT FOR DRIVEWAY.REQUIRED
RIGHT-OF-WAY CONSTRUCTION PEFJ41T REOV
19 �, W-1 - IM �
BOND REQUIRED FOR PUBLIC IMPROVEMENTS ----oo"
STREET NAME SIGN REQUIRED
OTHER SIGNI NG REQUIRED ---
m
(ADDITIONAL COMMENTS ON BACK)
EXISTINC WATER MAIN SIZE
WATER MAIN REQUIRED
SERVICE LINE REQUIRED
w
HYDRA14T SIZE EXISTING
4c
HYDRANT REQUIRED PER FIRE CODE
"VIA
SIZE
CROSS CONNECTION INSPECTION
WATER HFTER CHARGE REQUIP. ED
REVIEW P
DATE (ADDITIONAL C0114ENTS ON BACK)
a: SANITARY SEWER DUVIING NUM.BER FILE NU14BER
ui SIDE SEWER AVAILABILITY SANITARY SEWER CONIIECTIO14 FEE REQUIRED
3:
uj
-OPE N DITCH EXISTING Alo REQUIRED
m CULVERT REQUIRED 17,,o
,p,,q o cj5-0
,eAl orj�4A-) SIZE
CATCH BASIN REQUIRED INDICATED ON SITE PLAN
z SHOULDER DRAINAGE MAINTAIN COLLECTION ON SWALE OPEN RUNOFF
MANHOLE REQUIRED INDICATED ON SITE PLAN
cr
0 SOIL CONDI 0 LD CHECKED
OD , REVIEW BY DATE
,L,fl (ADDITIONAL COMMENTS ON BACK)
CITY OF
EDMONDS
CONSTRUCTION PERMIT APPLICATION
NAME (OR NAME OF BUSINESS)
(-To Lo
kock
MAILING ADDRESS
/// 0 7S-
CITY
__TTELEPHONE
NUMBER
3/ 7 7
;AME
Ro Lei-f
E \/oLwq
TDDRESS
//v Al,
1�, a
/ 7S
CITY
JALL.
TELEPHONE NUMBER
NAME
ADDRESS
CITY I TELEPHONE NUMBER
STATE LICENSE NUMBER I CITY LICENSE NUMBER
Legal Description of Property - include all easements
(show below or attach four copies)
/C-XS -Z / -e Z -, R16c- K L)
CS-it3 xtw
I'SA
ZS N EW
Ful
In RESIDENTIAL
PLUMBING
ADDIALTER
FZ71
VN NON-RESIDENTIAL
El MECHANICAL
EJ REPAIR
T71
ICN RETAINING WALL
SIGN
DEMOLISH
rVj EXCAVATE
lefS OR FILL
FENCE
( x _ FT)
PRE -MOVE INSP.1
COMPLIANCE INSP.
swim
P0nI
SIDE SEWER 1:1 WATER LINE
El
�UMBER OF STORIE9 NUMBEROF
Uh
DWELLING
WI
.,IT.R o L) e4, T3,-sQ U N I
NATURE OF WORK TO BE DONE (ATTACH PLOTPLAN)
4:� e- 4e- 1,3 1. � I A i � i I -C - I I I 4�11 1_1
USE PERM`ff
ZONE NUMBER
ADDRESS 5-LLI in Q I' n
LEGAL DESCRIPTION CHECK SUBDIVISION NO. LID NO.
o. k, I V5
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP.
EXISTING iV REQUIRED DEDICATION
PROPOSED__,�� 6)
RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED
STREET USE PERMIT REQUIRED 0
SEE ENGINEERING MEMO DATED
SEE PIW DEPT. REVIEW CHECK LIST DATED
134
I
METER SIZE BUILDING SUPP Y SIZE FIXTURE UNITS
Uj
REMARKS
M ETER S
IZE
REMARKS
SIGN AREA ENV. REVIEW ADS NO.
ALLOWED PROPOSED COMPLETE EXEMPT _&7_gZ
SHORELINE 0
C 0 CU
VARIANCE OR CU PLANNING REVIEW BY IDATE
YARDS 4!"
FRONT
CHECKED BY
SPECIAL INSPECTOR
REQUIRED
I I YES 'NO
PLAN CHECK FEE
BUILDING
PLUMBING
MECHANICAL
This Permit covers work to be done on private property ONLY.
GRADING/FILL
Any construction on the public domain (curbs, sidewalks,
driveways, marquees, etc.) will require separate permission.
Permit Application: 180 Days
Permit Limit: 1 Year - Provided Work is Started Within 180 Days
"Applicant, on behalf of his or her spouse, heirs, assigns and
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, Washington, its officials,
.2
employees, and agents from any and all claims for damages of
a:
<
whatever nature, arising directly or indirectly from the issuance
of this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirement of any city ordinance
0
1:
nor limit in any way the City's ability to enforce any ordinance
provision."
TOTAL AMOUNT DUE
I hereby acknowledge that I have read this application; that the
Information given Is correct; and that I am the owner, or the duly
ATTENTION
authorized agent of the owner. I agree to comply with city and
state laws regulating construction; and In doing the work authoriz-
THIS PERMIT
AUTHORIZES
ed thereby, no person wIll be employed In violation of the Labor
ONLY THE
Code of the State of Washington relating to Workmen's Compensa-
WORK NOTED
tion Insurance.
- - I DATI) SI
;NATU AGE 1) GNE
f�ne&
INSPECTION
DEPARTMENT
CITY OF
THIS SITE IS LOCATED IN THE CITY EDMONDS
OF EDMONDS. LOCAL SALES TAX
SHOULD BE CODED 31.04.
775-2525
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
CHAPTER 3.
FEB 1 1084
102-78
0
LOT COVER GE Z
Z
SIDE
REARI
Z
'ONSTRUCTION
ICODE
HEIGHT
_
REA
IGROUP
OCCUPANCY
OCCUPANT
LOAD
VALUATION
APPLICATION APPROVAL
This application Is not a permit until
signed by the Building Official or his
Deputy; and fees are paid, and receipt is
acknowledged in space provided.
OFFICIAL'S SIGNATURE
DATE
ORIGINAL. — File YELLOW — inspector Li
PINK — Owner GOLD — Assessor
H'IE
CITY OF EDMONDS
USE PERMIT
ZONE NUMBER
CONSTRUCTION PERMIT APPLICATION
c
joB
ADDRESS 5_L43 M
NAME (OR NAME OF BUSINESS)
(_T6k_,i k,,ck
cA I n -Si Y-cc+-
LEGAL DESCRIPTI N CHECK
ko,
SU13DIVISION NO. ILID
NO.
134
cc
W
Z
3:
ILING ADDRESS
S ' fQ
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP.
iV
0
/// 0 Al, / 7S- LXA- _ ;7-
1 CITY
1AL,
TELEPHONE NUMBER
-7
j
3/ 7
EXISTING REQUIRED DEDICATION 6)
PROPOSED_7,��
NAME
ARIGHT
OF WAY CONSTRUCTION PERMIT REQUIRED
STREET USE PERMIT REQUIRED 0
,ow
ADDRESS
//0 Aj 7S
SEE ENGINEERING MEMO DATED
SEE PIW DEPT. REVIEW CHECK LIST DATED
M
CIT TELEPHONE NUMBER
-)-- 3
REMARKS
NAME
ADDRESS
CITY I TELEPHONE NUMBER
STATE LICENSE NUMBER I CITY LICENSE NUMBER
)tion of Property - include all easements
or attach four copies)
/0XS _z / 4, -Z 21OCK D
r;�A
I/N NEW
ElADD/ALTER
F:71
kN RESIDENTIAL
S NON-RESIDENTIAL
PLUMBING
MECHANICAL
REPAIR
Ief!�l RETAINING WALL
SIGN
DEMOLISH
r1;7 EXCAVATE
VN OR FILL
M PRE -MOVE INSPJ
FENCE
El ( x _FT)
M swim
ElSIDE SEWER 0 WATER LINE
NUMBER OF STORIES NUMBEROF
UM'
DWELLING
44-, IT.Z R
NATURE OF WORK TO BE DONE (ATTACH PLOT PLAN)
METER SIZI BUILDING SUPP Y SIZE FIXTURE UNITS
REMARKS
?Rl&�,wQa (��6ULAT(:)P, f,1E_—GD
SIGN AREA ENV. REVIEW ADB NO.
PROPOSED COMPLETE I EXEMPT .-97-8/
SHORELINE#
VARIANCE OR CU PLANNING REVIEW BY
DATE
�k
YARDS
LOT CO
FRONT SIDE REAR
REMARKS
rz-
.1
, I.C2.e� X,4d�
ir
W
W
Z
a
iE
cc
Uj
Z
Z
5
CL
CHECKED BY TYPE OF CONSTRUCTION CODE HEIGH
�;\KUA I _�gj _ tA I I _M 715'Mb�
SPECIAL INSPECTOR AREA OCCUPANCY OCCUPANT
REQUIRED GROUP -3 LOAD
IjYES I'NO
REMARKS
Z
Tit-AMAL- 9
5
4-1— 6-3 co
PLAN CHECK FEE 1 55G
BUILDING Att 1 6-56 N
PLUMBING PV_P_Mjff-
MECHANICAL Pe-R41T_ ON
This Permit covers work to be done on private property ONLY.
GRADING/FILL
Any construction on the public domain (curbs, sidewalks,
driveways, marquees, etc.) will require separate permission.
Permit Application: 180 Days
Permit Limit: 1 Year - Provided Work is Started Within 180 days
"Applicant, on behalf of his or her spouse, heirs, assigns and
w
successors in interest, agrees to indemnify, defend and hold
2)
harmless the City of Edmonds, Washington, its officials,
i
employees, and agents from any and all claims for damages of
a:
<
whatever nature, arising directly or indirectly from the issuance
of this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirement of any city ordinance
TOTAL AMOUNT DUE
0
I
nor limit in any way the City's ability to enforce any ordinance
provision."
I hereby acknowledge that I have read this application; that the
information given is correct; and that I am the owner, or the duly
ATTENTION
authorized agent of the owner. I agree to comply with city and
state laws regulating construction; and in doing the work authoriz-
THIS PERMIT
AUTHORIZES
ed thereby, no person will be employed in violation of the Labor
ONLY THE
Code of the State of Washington relating to Workmen's Compensa-
WORK NOTED
on nsuranc . -
INSPECTION
SIGNATUP WN OR AGEPT DATI) SIGNEO_,,,
DEPARTMENT
IL
CITY OF
THIS SITE IS LOCATED IN THE CITY EDMONDS
OF EDMONDS. LOCAL SALES TAX 775-2525
ATTENTION SHOULD BE CODED 31.04.
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE
UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR
A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC
FEB
CHAPTER 3.
14 W4
APPLICATION APPROVAL
This application Is not a permit until
signed by the Building Official or his
Deputy; and fees are paid, and receipt is
acknowledged In space provided.
OFFICIAL'S SIGNATURE
JA0A0QV__ M-1
DATE
*3-13 — S4
ORIGINAL — File YELLOW — inspector
PINK — Owner GOLD � Assessor
ENGINEERING iPUBLIC WORKS
CITY OF EDMONDS
CIVC CANTER - EDMONDS, WASMNGTON 90020
SINGLE FA14ILY 11ULTIPLE COMMERCIAL
PROJECT REVIEW
CHECK LIST
PROJECT NAME ze-, CONTACT NAME & TELEPHONE NUMBER
64" !7
ADDRESS
ACCESS SLOPE AND VEHICLE ACCESS
DRAINAGE PLAN
STREET FILE
LEGAL DESCRIPTION VERIFICATION
QUIT CLAIM/DEDICATIONS
EASEMENT - PUBLIC/PRIVATE
z CALCULATE SEWER CONNECTION IF NO LID
cr
Lu
w STREET PAVING REQUIRED
z
0 CURB AND GUTTER REQUIRED
w SIDEWALK REQUIRED
CURB CUT FOR DRIVEWAY.REQUIRED
RIGHT-OF-WAY CONSTRUCTION PERMIT REO/Rf/D
x
3:
x
L.0
3:
ui
co
cr
z
L4()
0
BOND REQUIRED FOR PUBLIC IMPROVEMENTS :7::�
STREET NAME SIGN REQUIRED
OTHER SIGNING REQUIRED
ME
(ADDITIONAL COMMENTS ON BACK)
EXISTINC- WATER MAIN SIZE "" c
WATER 14AIN REQUIRED IY14,
SERVICE LINE REQUIRED
HYDRANT SIZE EXISTING 5
HYDRANT RE9UIRED PER FIRE CODE SIZE
CROSS CONNECTION INSPECTION
,.y I,
C2
WATER MFTER CHARGE REQUIPED
REVIEW Bt:�� DATE (ADDITIONAL COMMENTS ON BACK)
SANITARY SEWER D%AVIING HUM.BER
SIDE SEWER AVAILABILITY
.-OPEN DITCH EXISTINri lk/o
FILE NUMBER
SANITARY SEWER CONNECTION FEE REQUIRED
r
REQUIRED
CULVERT REQUIRED 04e4e 404,41-) ..SIZE
CATCH BASIN REQUIRED INDICATED ON SITE PLAN
SHOULDER DRAINAGE MAINTAIN COLLECTION ON SVIALE OPEN RUNOFF
14ANHOLE REQUIRED INDICATED ON SITE PLAN
SOIL CONDIT
REYIEW By;�tND LD CHECKED DATE
(ADDITIONAL COMMENTS ON BACK)
DATE: 2-7-0,�
14EMO TO: Building Division
Community Development Department
FRM :
L Engineering Department
May S�--
SUBJECT: IJ I�T
After review of the subject Building Permit application, we have
the following comments:
1. Connection to City water system required.
2.
Connection to City
sanitary
sewer system required.
3.
Right-of-way Permit
required
for any work on City property.
4.
Driveway slope not
to exceed
14%.
5.
Backwater valve required
if
downstairs plumbing is below
elevation of uostream manhole.
6. Water and sewer lines to be separated by 10 foot minimum.
7.- Builder/Owner responsible for containing all temporary run-
off and erosion on site and may not impact neighboring
properties in any way.
Xigg-nature
I
L 11 IT fp�
A
O-rta-6 i/,
10 119TAL), Kft\llbloll�' 10 /5F'Ae-Pl�l CIN 1211
-W
I qrv�- ,I q Lit
rA
P12
ca
. �kl
11010
Poo
&
17"
AD
K ho
-*Z C� Pit Olt-
E_
e-9 t
me. 14
S14, 11 +t� b-z kcLKJI�lk 0 1�
. 0/00-96
0 STORM WATER RETENTION PLAN
oft.(
V 11
v�
0
V
0
AV
u
N "Olt
Ilk 36 / > E:
�J
I "VA droz-Ar 4,014�4!9. Jac
3'X9 XZO'
lo
TEMPORARY EhOSION C'
ONTROL PLAN
7B, 7o
-Ile
4
D14.
C.B. No.1 DETAIL
e_r4W-4e_ X774le-,eo v�e_
7�1_
ri
0,
41—
C. 00 7-71,�-J
C1_6VA 770A.1
,F74.-rd'je
Tie Z _.ow 43"
W,&,r A_4&e'
------ _W.4.:fA_-0
Aw.
___7_,yP1CAL CeO��_-so'CC7-1oU
FILTER FABRIC FENCE, DETAIL
(_4.KAVll=L tN_1 KANUt Ut I AIL
7 4=1e t
1(1,4 7-1 1/e5_ .54C-e—C-141- T,
to -,
0
06
&
C14 7"
&
0 4C
oft 13
RECHARGE TRENCH
DETAIL
1. ALL CONSTRUCTION SHALL CONFORM TO.THE "STANDARD SPECIFICATIONS FOR
MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED
BY THE CITY OF EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY
HEARINGS ON TH IS PLAT.
2. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OR PUBLIC
WORKS 24 HOURS PRIOR TO AND DURING 14ORK AND OBTAIN ALL REQUIRED
PERMITS PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC
WORKS PRIOR TO BACKFILLING UTILITIES.
4 . I ' T SHALLBE THE RESPONSIB ILITY OF THE CONTRACTORTO CLEAN FLUSH,
DISINFECT WHERE APPLICABLE AND OBTAIN SATISFACTORY APPROVAL FROM
THE CITY OF EDMONDS REGARDING THE QUALITY AND INTEGRITY OF EXISTING
WATER LINES SAN ITARY SEWER LINE, STORM SE14ER LINE RETENTION SYSTEM
ETC. WRITTEN ACCEPTANCE BY THE CITY OF THSE PROCEDURES MUST BE
TRANSMITTED TOTHt DESIGN ENGINEER.
GENERAL AND TEMPORARY EROSION/SEDIMENTATION NOTES
1. All temporary erosion/siltation fa il . ties shown hereon shall be maintaine
insatis factory condi ti on until such time that final.si te grading and/or
construction is completed. As construction progresses and.expect6d (seasonal)
conditions dictate, more siltation control facilities may be required to
insure complete siltation control on this property. Therefore, during the
course of construction it,shall be the obligation and responsibi-lity ofthe
permittee to address any new conditions thatmay be created by'his activities
and to provi de additional faci lities over. andabove what is shown hereon,
as�may be needed to protect adjacent properties.
2. Approval of this plan does x*e consti tute an approval of design, size or
locati on of future retention/detention facilities,on this*parcel.
3. All disturbed areas must be immediately stabli zed with mulching, grass
planting, hydroseeding or other approved erosion contro 1 1 treatment applicable
to the time of year in question.
4. All fill areas shall be compacted to 95 percent maximum density.
5. Rock for erosion protection shall be of sound quarry placed to a depth of
8-inch minimum.
6! All construction is subject to inspection by th e City of Edmonds Department
of Public Works and Building Department and the contractor shall notify the
City of their schedule in sufficient time.to permit inspection prior to and
during the work.
7. A copy of the approved plan must be on the job site whenever construction
is in progress.
N:
Storm Water Retention System &
C
Tempo'ryr Erosion Control Plans 5
443/4+
for JOHN ROCK
Lots 2 1 22, Blk. D, City -of Edmonds
Edmonds, Washington
Reid, Middleton & Associates, Inc.
Engineers Surveyors 0 Planners
. ..... 121 5th Ave. N., Suite 200, Edmonds, WA 98020
DRAWN CHECKED DATE FIELD SK. SCALE' FILE NO.
C2
?-794,44 Z - Z
SHEET OF
<
7,
IbR C)\/w
I 'L'LLEY
1(0 t�rv�WAy
Ob :-11, (" -
1-F
first floor/ site 1Dlan
6�L\Tc�
19
f�P�Ir.
rAr-�vL'T �)� fo� b
m
7 !;,
v
��Iy -IT
J x
-+-10
�q�
wo'j,IE�
IF
i /5 11 1 I -oil
on,
I
I() I . r--;
11 ") U
I
i
I
I
A RETtAliLC� APARTMENT BUILDING
project data
WA&2�IqTDH 9bo'l-D
-�y
rT
I �A
TAIL e�,)Tbrr,
e, 4-,r rL E50
r5
TO
�a �0
�T
TD�A
-PTA
W
f I'D 0,
cy)F �I�t�4 IDO
pbo\/f- 1'::;,T FL04 o 1 o
1�
"q 1!,Hp DOWN
i
legal description
I !Z*1 1-092 EM
3
AN
1-3
architecture and planning
1110 north 175th street (206) 542-3192
seattle, washington 98133 363-6512
of . two
basement plan
It
\-> 1 a
second f loor plan
south elevation /6
north elevation
I
y
If f WH I �E,
east elevation
section a -a
1/511,11-011
*�Ii;:, 11�()j
ROBERT E. YOUNG ASSOCIATES
V
1p�y
3E PLAN NOTr,
STORMWATER DRAINAG 4 ES:
1.
All cons truc t1on shall b e In accordjr)ci, w 4. n I io in L s h Cotinty arl�.,.
the City of Edmonds .13pecific.,.-Itions.
2.
4
A 11 nipe shall be laid o ri a properly pr-,�paved C un ,.-ItL n a, o di
o d o ("- r r
to "Washington State Spec - 7 - 2 1. 3 1. t r 1. �: I i; i (,-� rl i t 3 S I
leveling of the trench bottom o'r the, t: op o
as well: as placement and compact -Jon o I r t-� tj u, t r (i beddlrj�,�,- nriatt�,-pLal 'i
u,niform. grade so that the, (mtlre I e r I o L, t I I il 1.
a I
supported cjn unif'ormly derj-(� t�jrj jel(lint, 1) L1, e rulti-,",
material In the. bottom of' tfic! trt��rich the
"Gravel Backfill Cop Pipe B(--�dk1!,m:-'t, tho, f v ;I", lift of' pl,pt,�
may be oindtted pro
-vLded the !,,iater"al tri, thc!'' bottom
x x
loosened, regraded and cornpacf,�.,,d t,) room di"I)�-�e lift,/ I
............
All bulLding downspouts n,,-.J
the storm drainag
,e sys
..................
..........
...................
........... .......
.. ........
is.
4.
All drainage s t r li q t, u r f �s not on I'm t, o v
round 3ol I,d I o c k I tj 1-1 f 1,�i
Ix
Departme
rit. oC Publ,i(, W(,)rl(,:
.4
5.
Structures not h('�-in
44"F.J&-e-T TO C-YIW7-r.
J
any storm dra-truige p I ot
bank.
A copy of' the,,;o ,q)provod pjarl,-, !,11,1
6XIST. C5
Sit - JE�,
e-v
con3truct,lon 18 In
Er
Tar 1c)o.ro
INV. ')5.10 e."
.................
. ... . . ............
7
I t s ha 11. b i e roo 1) r 1 1, 1 1 ty of
I s t r u ban e t a 1. 1 x 1,,,, 1, 1, r) t 1,1 1,1,1 f"'. '111 1.,
ar-"
contact aij ijtjj,j,j,jj,- hill" fled, 1 11111 1��'d 1'') I'v, I
1 T-W& n S 4" F- e- V&-mm-)
powe r, ij r,� -4 (, r w,,.l I.. e,, r i rig I f 1 t), I
To F too. at
Idomt1l'yIng, tho 1�1)
-1 -,. 7Z 34." IN
few- �Vte.
W, V, -4�- V ;j I i / 4 rA b. M�jIfli,411.,
th -bio,-rn e-W4-rl �1'jr) k, i f 1, eff., jq, 1i
li,
01A.-
-1
TC71?
INV. 9 4 -7 G (,,4
INV. -'?Z. 7Z [Z" 01wT
0v6KF-L,0W 'Ir:?.7(:.
0,. 7-Ye
e0lZIF(Ca Ta
\S%tttr. TO )-jsW DIA'.
TO C-X(4�$T.C-12>
L /9, 01 YMPIC J1011WOR Y NO., 5 -7 4:5
19)cfje;r PyHfjqe opeffycl /j DlRfc7-
LY OYM L,4,0,0&R � Re'sm1crm
/J YI&BLE ONE &Dde 09 OM AE
LIN17 7OR Ox 6RA Af 1:1- - loo, 9 1
&ACK WHZN Llir
aare IS DOM AIZO
2 - oyemOw &. '76-147
W&DED 70 FRAAM So -
LIFT 64TE CICII-LG 24'
JT,41YDAAD C7,41V LADDfR,
C45C4DE CULVERT WNC. NIN
J7*,EPJ (7Y)OIC.41)
OR EQU I V.
.71
C191 kz!
plple-- UM-1460 A-> r->6r4S^'r10&f
3" CLEARMce
W r HOLE 11t, � DIA.
7-YRf Z'- 04;rm,6481N, 64-1
IN /Z MUM PLArt
W&D M ChfP CROM
N 0 7f: Xrtti P.M 74 f 4N4 0
.411
IMV M,0 CIUMV W14MIlAIT
(xxumimr x aerzewi.
t A M1 BASIN IYO. I
RfSTRICTOA D-f TAM
#TJ
54*SLAS WITH 2419 20m OPENING
4413ARSe 6"CENTERS
BOTTOM FACE -
*4 DAR
,SRA T-1 FfAvf-- OR 6.aCIAX-
e,74-1-AIC
722 /M6A9 ......
5r,9. e:SALV 36"
Corr. Steel
,02W4A-0 /A/ 01-AC—r-
AAe-Krlil� 671-1Xjf-L- CE
7,0 V5X' OeAl-;-Iry //-
aovze I
avid
2F
FEB 14 1984 Q)
WON
VO N
—0
N 0001'-ZZ"r=
1,4737'
6'r " AVE. N.
I ek I
ZO/ 'm I,
Za/ V WOW?2T Yl
4-33'
ts
RETA I (\I INC;
'AINING WA LL
LL
,A N 6*0 1'7-?" e
<L
to,). em
94,�7V
tr
a�
0
6.
co
4-;
10
10 A,-
Lu
r,
d) ir
P6
cr
2-
07.
Ave.
16,
w 000k , IL 2"F- T T
BUILDINQ BMEMENT ELEVATION c)(, 82
(41'0 00/ 22 "F
0 Z
/ le
,-f6',4Z,r : -f " - / '
��4t /t
A10101 - '22"IF It's
Ad \1_
0
9
0
Je',4Z,F .' J"z /'
AUG 14 1984
AUG 131984
14 lee 41e 60
/?C;j lyl;c0le';�fO)il ) I?-
cn
z
Or
z
0 W FIM91 LIM,
O-W-0-47"WO,
(A J1 L I
1--:
ui
co
, p
;91115
\0
i/NMR,5,fmCT/0,V
—0
A-1
0,
cn
01
z
F—
(1)
x
ui
/ /0\
ItZ44-1�
14
A
7000%, 12"r- N N
BUI,LDINQ BMEMENT eLEVATION - 94,.82
41MOI&IF
zo/ zZoe - -
, r: —f " ./ ,
L:7644-
v
0
cr
U%
lot
lo
22
/Vo 00/ ?p 7z'
AMC
�6%o� /P
4. 99'
Je',44F .- J- "- /'
AUS 13 1984
cr)
0
0
cr
01010
4
bl-� 10/1 ( , A ?
> le /-74
#
'ro
V� Poo
'03. ;JkA
0
N_
�A
ql I
fA \r\
`K AD
JA
141"
4
tZ
/,06.
X.
(4 b-z kaKAI-S 1:2,�
0� (6-zr". Dewo.
/CIO, 9 ��
i) k. 4.
V
Oft?.
STORM+ WATER RETENTION PLAN
'474" _-rc,04 ds, - �� 0,0 ,
7_ 7.
.11, AMEW 4_0
\U
N
'jx
-30
00
T 0
JV"l
I R/..� ;5:. Alc 0
APO,
0 4N.
//N� 4'!
Ar
C.B. No.1 DETAIL
orc,&-r"ff-�r
z>ez
'00"
4 1 14
7Z>e-4 ZIoe.1(gz.4_r Ar C'.
,0&,c y &b
C4 6 VA 7-10 Al
0
yo 460
431 'IV' IV - I I.,
7 %
A6 1Z__,_
&OR Z)1$r4bfB4M0 :Zje z -1W 6u, <nk< cipev'ge
lk
< V
_W
V J_fk'�—O
Ole",
-4
All. 049 Zt
/;T 3 IX.9
W,
. a q fa.
e:5, tr
___.7-,v,01CAL Ce0_5'e_,r6C770,U
e4'
FILTER FABRIC FENCE DETAIL
30,
JEMPORARYaF,�,OSION C*.O'NTROL PLAN
Q.RAVEL ENTRANCE DETAIL
T
f
rl V15 154c-c 4 Z_
;0_11
01
_F/
06 0 Z.
f, f 0 & 4. 6
0
t 6 C)
RECHARGE TRENCH DETAIL
1. ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICATIONS FOR
MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED
BY THE CITY OF EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY
HEARINGS ON THIS PLAT.
2. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OR PUBLIC
WORKS 24 HOURS PRIOR TO AND DURING WORK AND OBTAIN ALL REQUIRED
PERMITS PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC
WORKS PRIOR TO BACKFILLING UTILITIES.
4 . ITSHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN, FLUSH ,
DISINFECT WHERE APPLICABLE AND OBTAIN SATISFACTORY APPROVAL FROM
THE CITY OF EDMONDS REGARDINGTHE QUALITY AND INTEGRITYOF EXISTING
WATER LINES, SAN ITARY SEWER LINE, STORM SE14ER LINE, RETENTION SYSTEM
ETC. WRITTEN ACCEPTANCE BY THE CITY OFTHSE PROCEDURES MUST BE
TRANSMITTED TO THE DESIGN ENGINEER.
GENERAL AND TEMPORARY EROSION/SEDIMENTATION NOTES
1. All temporary erosion/siltation facilities shown hereon shall be maintained
in satisfactory condition until such time that final site grading and/or
construction is completed. As construction progresses and expected (seasonal
conditi ons dictate, more siltation control faci lities may be required to
insure complete siltation control on this property. Therefore, during the
course of construction it shall be the obli gati on and responsibility of the
permittee to address any new conditions that may be created by his activities
and to provi de additi onal facili ties overandabove whati s shown hereon,
asmay be needed to protect adjacent properties.
2. Approval of this plan does xae constitute an approval of design, size or
location of future retention/detention facilities on this parcel.-..,
3. All disturbed areas mustbe immediately stablized with mulching, grass
planting, hydroseeding or other approved erosion control treatment applicable
to the time of year in questi on.
4. All fill areas shall be compacted to 95 percent maximum densitY.
5. Rock for eros-ion--protection--shall-be-of--sound-quarry placed to a depth of
8-inch minimum.
6. All construction is subject to inspection by the City of Edmonds Department
of Public Works and Building Department and the contractor shall notify the
City of their schedule in sufficient time to permit inspection prior to and
during the work.
7. A copy of the approved plan must be on the job site whenever construction
i s in progress.
4k
s)
Z
Storm Water Retention System &
Tempory Erosion Control Plans
for -JOHN ROCK
Lots 21 & 22, B1k. D, city of Edmonds
Edmonds, Washington
Reid, Middleton & Associates, Inc.
0
Engineers e Surveyors Planners
...... . ....
Z.: 121 5th Ave. N., Suite 200, Edmonds, WA 98020
.... ........
DRAWN CHECKED DATE FIELD BK. SCALE FILE NO.
_,ol e - 10 _P
/cv
SHEET OF
CZ C_( C_ -Cy.
Y40alo
;��k
37-
13
Am
,�f,o -, ouot, X---