550 DAYTON ST.PDF11111111111
10825
550 DAYTON ST
ADDRESS:
TAX ACCOUNT/PARCEL NUMBER: Coq?,q2 Zip/ L)()()
BUILDING PERMIT (NEW STRUCTURE):=3n.:962(WA1rJQ)
50 MUlh (
COVENANTS (RECORDED) FOR: 200 �jm 5
. - 2)D
CRITICAL AREAS:, DETERMINATION: E] Conditional Waiver Study RequiredQ�eaiver
DISCRETIONARY PERMIT #'S: 6D6
DRAINAGE PLAN DATED: 10-S-02,
PARKING AGREEMENTS DATED:
EASEMENT(S.) RECORDED FOR:
PERMITS (OTHER):"3Q2>5A(fi=,) 20am4CDA�2m4W
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED: it' 12-021 9-i0-05(Re.,4i5&j), 5'Z5-Q5
SEWER LID FEE
SHORT PLAT FILE:
SIDE SEWER AS BUILT DATED:
SIDE SEWER PERMIT(S)
GEOTECH REPORT DATED: 5-2-0-M
STREET USE / ENCROACHMENT PERMIT
LID
LOT: 16 � 11 BLOCK: /;U
WATER METER TAP CARD DATED: 2-2c) lb
LATEMP\DS'Ps\Fom1s\Street File Checklist.doc
RECEIVED
S, :
MAR 0 12005
PERMIT COUNTER
RANSPLANTED ACER
SIDEWALK
Ex. PIERIS
.EBORUS ORIENTALIS
SED STONE PLANTER
DAYT,
AA"I'IJM'BLOODGOOD' d DRIVEWA.
OClf!-_CA. RUSCIFOLI
LEBORUS ORIENTALI
Z-AJ'M ML-OC-4L-
RETE RETAINING WALL J.
PROPERTY LINE-
6,* CEDAR FENCE —
H. BOLLARD LIGHTS —
COTULASQUAL.IDA-
-AN NORTH
V-0"
::HARACIAS WULFENII—
JM ALOPECUR4:NOF—S
DAYTON
CONDOMINIUMS
—TRANSPLANTED ACER
TRANSPLANTED PIERIS #2
—ATHYRIUM NIPPONICUM
—VACCINIUM OVATUM
A5;Aozuw,.
! _tZE'e. =ENDSII 'BRIDAL VEIL*
.'r
A
P IgM POLY8LEPHARUM
61 A NCE
H EARIS NOOTKANENSIS
_�38L&AUM SPICANT
1P,
—ACER CIRCINATUM
NOOTKANENSIS'PENDULA
_ACER CIRCIINATUM
— DRY STACK STONE RETAINER
—TRANSPLANTED PIERIS # I
_PEIRIS JAPONICA *CAVATINE'.
—VIBURNUM TINUS 'ROBUSTUM'
QAY_R
HELICTOTRICHON
SEMPERVIRENS
PARKING SPACVS
TRANSFORMER, YA.J"r
2
TRASH ENCLOSURE
6
-------
--- —
16
STREET
ALLEY
FILE
I' -
I
j ��!i
DATE RECEIV
:P* ERM IRES
q
PE
NUM 7
CITY'OF EDMOND.8'
JOB SUIT&APTR
CONSTRUCTIORPERMITAPPLIC AT ON. i. 'ADO E
_T_ as
OWNER NAME/NAME OF BUSINESS
4ar�ford Contracting, In6. PLAT NAME�JBDIVISJON �0, f LID NO.
;,' . . . . . . I LOT NO. LID FEE It
Cl MAILINGADDRESS t; ";
.13256 Northup Way, #10 .
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
1:..'
TESCI 1,— .0
Panne R_"` 8
Us. li—it Raq.
CITY ZI P . TELEPHONE
1
.:
��XISTING — PROPOSED�
Imu—in Reas'. 0
suounme, Req.1a" a
3ellevue, 1W
�425-643o-8�80"'L::-,__.�
- A . EdIAREDDEDICATION_ FT
U..N-
NAME
:�,�METER SIZE
LINE SIZE
NO. OF FIXTURES
PRV REQUIRED
YES 0 NO 0 3
ADDRESS
REMARKS
;OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL(DRAINAGE
^ITY, ZIP ]TELEPHONE
NAME
Hafi�fclrd Contracting, Inc.
ENGINEERIhIG REVEIVEDIDATE
ADDRESS
.132,�6 Northupi Way, #10
E REVIEWED BY
ass
DATE
ZIP
TELEPHONE...
WA
t.� -
425-643�8580"
—Bellevue,
STATE LICENSE NUMBER
EXPIRATION DATE
CHECKEOSY
, VARIANCE OR CU
SHORELINE OR ADBN
INSPECTION
REO 'D
BOND
POSTED,
C3 YES 0 NO
HARTFC1088LP 6/15/02
SEPAREVIEW
SIGN AREA
HEIGHT
PROPERTY TAX ACCOUNT PARCEL NO.
COMPLETE
EXXEMPT
A
.PROPOSED
N/A
ALLOWED PROPOSED
0043242-121.-016�00
Exp�
0 NEW
RESIDENTIAL
0. PLUMBING/MECH':
61�
LOTCOV.,FlArE
A I E ED
REQUIRED SETBACKS (FT.)
FRONT SIDE REAR
PROPOSED SETBACKS (Fr.)
F�O . NT J/RSIDE REAR
0 ADDITION
0 COMMERCIAL
C 4PLIANCE
0
CON
HANGEOFUSE
PAAKING
LO�A
0 REMODEL.
0 APARTMENT
0 SIGN
. REOD PROVI 0
61
FENCE
0 REPAIR X* Fl?
-7--
-No V FA IE7fA.
OTHER
(n DEMOLISH . 0 TANK
0 rA AGE RETAJNINGWAUL RENEWAL
,ARP.RT 'K" Y
r R C
k0e, Af1PF_-0VAL_
(TYPE OF USE. BUSI;rFI ACTIVI Y) EXPLAIN:
CHECKED BY"
TYPE CONS RUCTION
CCUPA NT.
4.-
GROUP
10
NUMBER
OF
HUM ER 1,.CFIITtCA
OF
DWELLING AIR EAS
SPECIAL INSPE AREA
OCCUPANT
STORIES 01
0 1
UNITS MBE
�RIEOUIREO OCTOR I
YES
LOAD
DESCRIBE WORK TO BE DONE
REMARKS z
PROGRESS INSPECTIONS PER UBC 1081FINAL INSPECTION REO'D
Demolish SFR 4 575:�
lo ts 16 & 17, b16bk'-'1if,-
'
&L-�
.
Ciiy of Edmonds, V2, P39.in
: &gL9'*-
Snohoriiish County., Washington
VALUATION
..FEE
PLAN CHECK FEE
HEATSOURCE
GLAZING %
LOT SLOPE
BUILDING'
PLAN CHECK ND:
IVESTED DATE
PLUMBING
RIECHA�IC�L
THIS PERMIT AUTHO IZES ONLY THE W . ORK NOTED. THIS PERMIT COVERS WORK �6.�
R
:
t 8 E DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC L
-
G�ADINGIFII,I_
DOMAIN (CURDS . SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMI��IPN
t: ... I - - . .
4rn� RqfiARGE
' P E MITAPPLIcAnON: 180DAYS
PERMIT LIMIT. I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
'EN"G.'REVIE'W FEES
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
F OF HIS OR HER SPOUSE. HEIRS. ASSIGNS AND SUCCESORS
ENG. INSPECTION FEE
u, IN INTEREST. AGREE TO INDEMNIFY. DEFEND AND HOLD HARMLESS THE CITY OF
NO APN'
',NSPI.'CTI.N
Is ED'ONDS.WASHINGT N ITS OFFICIALS: EMPLOYEES, AND AGENTS FROM ANYAND
1E9
ALL CLAIMS FOR DAMAGEi OFWHATEVER NATURE. ARISING DIRECTLY OR INDIRECTLY,,
R'C E
RECE
- FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
PLAN CHECK 0 POSIT
0 DEEMED TO MODIFY. WAIVE OR REDUCEANY REQUIREMENTOF ANYCITY ORDINANCE
0 NOR LIMIT IN ANY WAYTHE CrrrS ABIUTY TO ENFORCE ANYORDINANCE PROVISION.'
RECE
RECE
TOTAL AMOUNT DUE
.
4OR
I HEREBY ACKNOWLEDGE THAT: HAVE READ THIS APPLICATION; THAT THE 114ORMATION
GIVEN IS CORRECT. AND THAT AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
CALL
TION: AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
OFPTHE LABOR CODE OF Tort"I"ATE OF WASHINGTON RELATING TO
N VQ;T
FOR INSPECTION
S
WORK e�
S ENSATION 1��RAN5KNO RCW 18.27.
'CO
S TU Q
DATE SIGYED 1
(425)
LW
A le
771-0,2222.00
1 0
A17ENT , N
EXT 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
771-0221
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-.
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
FAX
5198
APPLICATION APPROVAL
This ap lioationju, not a pernst until signed by the
Building Offl�cisl o, hisJhor Deputy: and Fees am paid. and
receipt Is ackni-ledgad in space provided.
/GIG, T �11—� 'DATE
ELEASED BY AATE/
ORIGINAL -FILE YELLOW- INSPECTOR
PINK - OWNER GOLD - ASSESSOR
7
CA File No: 0
-Critical Areas Checkli*
Site Inform . afion'(soi ' Isl ' t6pography/hydrolagy/vcsgetation)
1. Site Address/ Location: -!746 DAY7WtJ sTge-i5r AWMot47S' WA
2. Property Tax AcciountNumbe�r:
3. Approximate!Site',Size (acres or square feet):.,
4. Is this site' currently developed? _k yes; 'no.'
If yes; how is site. deMoped? StAIM-e
5.. Describe the general site topography. Checkall that apply.
Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site, generally less than''15% (a vertical �rise of 10-feet over a horizontal
distance of 66-feet).
Hilly:, slopes presenf, on site'6hnore than'15% and less thari 30% a vertical rise of 10-feet
h"T" ' ditan�e6f, 3
overa orizontal is 3 to"`664e6t):
Steep: grades -of grea - ter than 30%,present on site (a vertical rise of 10-feet over a horizontal
distance -of less,than 33-feet).,
Other (pleasedescribe):'
6. Site contains areas of year-round standing waitei `tJo, :A prox. Depth:
p
7. Site contains areas of seasonal standing waten, NO Approx. Depth:
What season(s) of the year?
8. S ite' is in the floodway flood in 'P�6 of a! water: course.
plai.
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round?
Flows are seasonal? �MhaUime-6f - ear? tIZA
y
10. Site is primarily: forested meadow shrubs mixed
urban landscaped (lawnshrubs etc) X
11. Obvious wetland is present on site: )46
.4
ca
��ej� , To
WTI.
_5
;7.:'' 1W,
%5
'��-gn z-
W
17 'R
i� o
yp.e
q Rr "9
Wtk 'at& kk!'M AY'
-MiMd"'Byen or &W -Gi 150-
q
W"MVIVf�
240,a
MM
"J
it& kla't i a', e i i ffi: S'U" b i d i
St.
ilkM'
,
qgL
. . . . . . . . . ...
S4,
.7
eviewed! t"i
Critical Areas Cheeklist.doc/3.19.2001
mon'ds
City of -d "' - I -
Development'Services Departinept�.,,
Planning Division
hone'?, 425.77-1.0220.,
Fax: 425.771.022 lk,�)
iz
Date Receive —VIW14A
City Receipt #:
Critical Areas File
-Critic6l Area!�-,�Checklist Fee: $45.00
,,.I, Date. Mailed,;to.ADDH�c n -
The Critical Areas Checklist contained on-Ahis-fo
fm-isto �A�properqy%q)�per, or his/her .'authorized,- representative
c st, sign an date it, and submit it
be filled out by any -person preparing a 'Dev�loprrieln—t�-"--mlist'fliI -the-,che' ldi- d'
Permit Application for the City of Edmonds prior to --'Ao'� -the City. - The City, will review the checklist, make a
his/her submittal of the application to the City. _precursory site visit, and make a determination of the
sub§equerit steps necessary 'to complete a development
The purpose of the, Checklist is to enable City staff to
perm�tapplication.,
determine whether any potential Critical Ar6als''are,'6f'"
may be, present on the subject property. The information Please submit avi6iiii-ty miap',;along with the signed copy
needed to complete the ,Qhecklist. should, be :easil x� -oft�isfbrmtoassist.City t4f
I ' .' Y�) " '. . - 1. 1 . § fin finding land locating the
available from observations of the site or data a�ailabl�e, at,. specific, Diece of property, described on thi's * forrin In
City Hall (Critical areas inventories, maps, or soil addition, the applicant shall include other pertinent
'rinf6rination (e.g.:'sit� Plahl,"topogtaphy map, etc.) or
surveys).
stiidies'n conjunction with this -Checklist to assistant * staff
in completing theirpreliminary assessment of the site.
The undersigned applicant, and his/her/its heirs, and assigns, ini consideration on the processing of the application agrees
to release, indemnify, defend and hol d the C ity'of - Edmonds harmles s from any and a 11 damages, including reasonable
attorney's fees, arising from any action- or I infraction- 1�4'ge'd in- Whole I or part upon Ialse, misleading, inaccurate - or
incomplete information furnished by the applicant, his/her/its agents or q!11p1qyees.
By my signature, I certify that the information and exhibits.,herewith submitted are,true and,correct to the best of my
knowledge and that I am authorized to file thi �s-a''p"p'iiica'tliori-oii-i'l�-behalf of the owner'as'listed -below.
P"
DATE 99
SIGNATURE OF APPLICANTIAGE
Property Owner's Authorization
By my signature, I certif� that I have authorized the above Applicant/Agent to,apply for the subject land use application,
and grant my permission for the public officials and the staff of the Cit�..of Edmonds to enter the subject property for the
and posfi�Vattendpqq,
,;)iis apo ri
purposes of inspection
Owner/Applicant: .,'Aoolicanit Representative:
"l-,a) 1! �9,46/5 �,711106x C L4ai5- WA
Name 'Narri6
Street Address Stre'ef'Address.,,
q8 605-, K, g le. L'A� 0 VJA- q8os�
City State Zip ,i7,ity.. State zip
Telephone: -ZS) Tele n V�)
-pho e:-
Email address (optional): Email Address (optional):
Critical Areas Checklist.doc/3.19.2001
CD
7-,
gm
09
op�
�gl
KA to
Ij
lk�
425 643 8611; 11 /06/02q40AM;JetFaX- #390;page 2/2
;ent.by: HARTFORD.CWR TING
UT HARTFORD
a U
9 1 rs�'L-. I IU CONTRACTING, INC.
BID,SCOPE/QUOTATION
PROJECT: 550 Dayton St. Condos DATE: October 3.1 2002
Edmonds, WA.
We include the foilo�ying work:
Driveway, CUTbs�
- Site Utilities, Eanhwork, Site Concrete work, Sidewalks,
We exclude the foflowing:
WSST; bonds; pennits; fees; U.qe tax; testing
Enuineering I Layout / Dewatering
0
Barricades or traffic contMl
N4)sc iron material,
Storm system
Sewer system
Water system
Earthwork
Concrete Site Work
$12,500
1,5-; e->0 (z),
$7.5()()
"t
$3:500
41
1 -)'(W
14i*4z>
$15,500
1 4,e>O
Total Base Bid - $ $51,000 J
Conditions
.Lf bid'.
Bid based (in access 10 job site for concrete trucks and deliveries
The area around the work site to he availahle for our storage and work space
Bid valid for 90 clays
Prime to provide water, power, and toilet. facilities
Proposal is based on receipt of standard subcontract for AIA, ASC, Or ASA with
asis as prime
retainage to be on same b'
Prime.to provide dehris box. Hatil'Ord . Contracting will cleanup our work
Bond is available at 2.5%
Ron ild 11. Smith
ENtimator
'11�jvz
ne
4X
111i'le Z,-
CCIC I at-oviaw nrive-Suite 260 0 Kirkland, WA 98433 0-Ph (425) 7A9-4756 0 Fax (425),739-0711
LOCAr' LOCATE REQUEST NUMBER
DATE CALLED:
FOREMAN/CREW FUTURE SERVICE NO
COMMENTS BORE: CUT:
DRAWING 4
LOC-X- DATE: -S/6.5
U OC INITIAL:
Lci . 0 G"
I
ACCOUNT: z
METER SHOP
ROUTE/SEQUENCE
SUPPLIER:
TREATMENTPLANT
FOREMAN
B L T-
UTILITY
SIZE
LOCK 0
BILLING
RESIDENTIAL
UNLOCKED
APARTMENT
UNITS
OFFICE
UNITS
COMMERCIAL
UNITS
City('_�j Edmonds — Water Departrk'nt
TAP CARD
No. �73_1�_
Meter Reading: (5CCO 0
ISize I
Mfgrs. No. Style
/Purchaser:
- �Yl 15- 1! p �'
/I.Serv. Add.
Billing Address:
xN a me
Street IV191 /?7M
city
Date: C 91c 9, 94! t 5 Rec'eipt:&' �1!5_
7
Meter Size: Meter, $
Connection $
,Street Cut $ Permit # C2�zz
Meter Location E - PRo P L-i t* 13 �j r- /L VAvLA
Service Material: /2-
Pressure lbs. GPM
Date of -Work By': 0 6. -5
.Proj. No:
Remarks-
'Rik
APPLICATION
for
The City of Edmonds SIDE SEWER PERMIT
NEW CONSTRUCTION C] REPAIRS EASEMENT No . ..........................................
OWNER........ ---- 7-L . ................................................. CONTRACTOR .................................................................................................. PERMIT No . ......................
ADDRESS -...,54? .... ... %�� - -------------------------------------- .............................. BLOCK No . ............................................
... LEGAL DESCRIPTION: LOT No . ................
NAME OF ADDITION
0
0
Aw I
ha,2, 6ZA- dw-"�
/I? 7Q
ppro,
i*.
DATE................................................ By ......................................................................
_177-7
STANDA DRAINAGE D
WORKSHEET
OWNER' U I
r
ADDRESS
C-AMOAAr. OA. L7� o2o
IMPERVIOUS AREA
N SYSTEM
CALC BY.
PHONE: 4W -3q/-) /4 1 C
DATE: b 7,
"'DESIGN DATA*****
PIPE DIA PIPE LIS
3o
FINISHED G DETENTION PIPE LENGTH
'!�nl I &L MINIMUM
T
.5Z TO IX SLOPE
ORIF�O.E
!NG LID
ICAL)
REF C. E I V E D
%EATU6E�yg0mNcfOPjO1FI L 2 ��' 2'Q I � I
CONC BOX OR RISER
-----TD OUTLET BuiLDNO DEE_PT
OUTLET CONTROL
MIN.
UPPER CATCH BASIN ORIFICE
"V
CONTROL CATCH BASIN
SYSTEM CROSS SECTION.
2'X2'X6'.DEEP, 4-6- SPALLS OR EGUAL
FROM CONTROL CB 2'X 2'x 3' DEEP, 3/4' CRUSHED RUCK DE
FROM CONTROL OUtLE�T
ENCH. MIN 10' LdNG.
N%TR H SMALLC15EL NSF WITH
JUMP' OUTLEV PRiGNER TO PLA . N1 VASHCNDIRDkRFAiN ROCK
RUNOFF SPREADER. TRENCH
FOOTING DRMNS SHALL NOT BE CONNECTED TO DETENTION SYSMM
NOTES.-
1. Call Engineering Division (771-0220) for a fightline, and detention system inspection
before backfilling and for final inspections. APPROVED BY
2, Responsibility for operation and maintenance of drainage systems on private property is the
responsibility of the property owner. Material accumulated in the.stomga pipe must -be flushed
out and removed from the catch basins to allow proper operation. lUe outlet control orifice DATE
must be kent onen at all times.
Table 1 — Detention Pipe Sizes
Impermeable
Required
Area Sq. Ft.
Vol Cu Ft
2000
50
2500
62
3000
75
3500
87
4000
100
4500
112
5000
125
Note: Allowable Pipe Materials:
Impermeable
Area Sq. Ft.
2000.
2500
3000
3500
4000
4500
Pipe Diameter
15" 18m 24n 30u
40
28
16
0
50
35
20
13
60
42
24
15 Required pipe
70
49
28
18 length in feet
80
56
32
21
90
63
36
100
70
40
25
Reinforced Concrete
Aluminized Steel
Aluminum
CMP Asphalt Coated
N — 1. 2 ADS (Not permitted on roads)
Table 2 — Outlet Orifice Sizes
Outlet Orifice Diameter (Inches
5/8
5/8
3/4
3/4
7/8
7/8
Table 3 — Rectangular Catch Basin Requirements
Detention
Max. size.
Catch Basin
pipe diameter
knockout—
Type
< 18M
200
Type 1, C13 IS
18" to 24'
260
Type IL, CB 16
240 to 36'
360
Type 11, CB 19 19 (480 Basin)
36"to 42"
4211
Type 11, C13 19 19 (54" Basin).
*Source: Assoc. Sand & Gravel Co. Standards
GEOTECHNICAL ENGE'iEERING STUDY
PRoposED DAYTON CONDOMMWUMS
548 DAYTON STREEET
Emoms, WAsmiGmN
G-1516
Prepared for
Mr. David Calixto
Hartford Contracting
13256 NE 20'h Street, Suite 10
Bellevue, WA 98005
March 22, 2002
GEO GROUP NORTHWEST, INC.
13240 NE 20'hStreet, Suite 12
Beflevue, Washington 98005
Phone: (425) 649-8757
RECEIVED
MAY 2 0 2002
BUILDING DEPT.
STREET FILE
M iffl Group Northwest,
March 22, 2002
Mr. David Calixto
Hartford Contracting
13256 NE 201h Street, Suite 10
Bellevue, WA 98005
Inc.
Subject: GEOTECHNICAL ENGINEERING STUDY
Project: Proposed Dayton Condominium
548 Dayton Street
Edmonds, WA 98020
Dear Mr. Calixto:
Geotechnical Engineers, Geologists
& Environmental Scientists
G- 1516
Geo Group Northwest, Inc. has completed a geotechnical engineering study of the proposed
Dayton Condominium project at 548 Dayton Street in Edmonds, Washington. Four test pits
were excavated on March 14, 2002. Suitable foundation bearing sod consisting of dense to very
dense silty SAND with varying amounts of gravel was encountered at a depth of 3.5 to 4 feet
below the ground surface. No groundwater seepage was encountered. Based on the results of
our study, it is our professional opinion that the site is geotechnically suitable for the construction
of the proposed condominium. The proposed building can be supported on conventional spread
footings bearing on the dense site soils.
Please refer to the text of the attached report for specific details regarding our site development
recommendations. Should you have any questions regarding this report, please feel free to call us.
Sincerely,
Geo Group Northwest, Inc.
ZOOA-ric� a7�'e
William Chang, P.E.
Principal
13240 NE 2Dth Street, Suite 12 * Bellevue, Washington 98005
Phone 425/649-8757 e FAX 425/649-8758
K
TABLE OF CONTENTS
JOB NO. G-1516
Pgge
1.0
INTRODUCTION
1.1
PROJECT DESCRIPTION
1.2
SCOPE OF SERVICES
1
1
2.0
SITE CONDITIONS
2.1
SITE DESCRIPTION
2.2
GEOLOGIC OvERvIEw
2
2
2.3
FIELD INvEsTiGATION
2.4
SOIL CONDITIONS
2
2.5
GRouNDwATER CONDITIONS
3
3
3.0
SEISMICITY
3.1
PUGET SOUND SEISM . C HISTORY
3.2
.........
UNIFORM BUILDING CODE
3
4
4.0
CONCLUSIONS AND RECOMMENDATIONS
4.1
GENERAL
4.2
SITE PREPARATION AND GENERAL EARTHWORK
4
4.2.1
Wet Weather Considerations
5
4.2.2
Weathered Zone Preparation
5
4.3
...............................................
STRUCTURAL FILL MATERIAL
6
4.3.1
Structural Fill Placement Compaction
6
4.4
and .............. .......................
SOIL CEMENT & SUBGRADE STABILIzATION
7
4.5
...... .......
ExCAVATIONS AND SLOPES
8
4.6
...................
.................................
FOUNDATIONS
9
4.7
..................... .........................................
SLAB-oN-GRADE FLOORS
9
4.8
....................................................
PERMANENT BASEMENT AND CONVENTIONAL RETARqING WALLS ......................
10
10
4.9
DRAINAGE
4.9.1
Surface Drainage
4.9.2
......................................................
Footing Drains
12
........................................................
13
5.0
LIMITATIONS ..........................................................
13
6.0
ADDITIONAL SERVICES ................................................
14
ILLUSTRATIONS
Plate I -
Vicinity Map
Plate 2 -
Site Plan
Plate 3 -
Geologic Map
Plate 4 -
Typical Footing Drain Detail
APPENDIX A - TEST PIT LOGS & USCS SOIL LEGEND
Geo Group Northwest, Inc.
GEOTECHNICAL ENGINEERING STUDY
PRoposm) DAYTON CoNDommwums
548 DAYTON STREET
IEDmoms, WASMINGTON
G-1516
1.0 P4'MODUCTION
1.1 PROJECT DESCRIPTION
The project site is located at 548 Dayton Street in Edmonds, Washington, as shown on the
Vicinity Map - Plate 1. The proposed development will consist of a three-story, four -unit
condominium with a four car garage to be located on the north side of the building and four open
parking stalls to be located next to the alley. The building will have a footprint of approximately
71.5 feet by 39.5 feet (2,824 square feet). The side yard setbacks will be 10.3 feet, the backyard
setback will be 21.5 feet and the front yard setback 17.0 feet, as shown on the Site Plan, Plate 2.
-The bottom floor will be concrete slab -on -grade with a finished floor elevation of 94.58 feet.
1.2 SCOPE OF SERVICES
The tasks completed for this study were conducted in general accordance with the scope of work
presented in our proposal dated October 19, 2001 and the request for proposal prepared for 548
Dayton LLC, dated December 20, 2001. The scope of work included the following:
Excavation of four test pits to depths of up to 10 feet dependent upon the depth of dense
native sods. The test pits were logged by an experienced engineering geologist from our
office and representative soil samples were collected for moisture testing in our
laboratory. Soil logs were prepared containing the soil classification and moisture test
data.
2. Engineering analysis for foundation support design criteria, grading considerations,
excavations, drainage and earthwork criteria for the on -site sods and imported sods.
Preparation of this geotechnical engineering study report with the results of our activities,
findings, conclusions and geotechnical recommendations.
Geo Group Northwest, Inc.
--a
0 0
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 2
2.0 SM CONDMONS
2.1 SITE DESCRIPTION
The project site consists of two rectangular shaped lots that together measure *approximately 59.9
feet east/west by I 10. 1 feet north/south (6,601 square feet) as shown on the Site Plan. The
project site is bounded on the north by Dayton Street, to the south by a 15 foot wide paved alley,
to the east by a single family residence and to the west by a condommium. .
Topographically, the site is relatively flat, sloping downward toward the northwest property
comer at a gradient of 7 to 8 percent, from 104'feet at the southeast comer to 95 feet at the
northwest property comer. At the time of our subsurface site investigation the grading contractor
had completed the demolition of the former residential structure shown on the Site Plan, and was
removing the debris The project site is currently stripped of most vegetation with the exception
of a grass lawn area and one tree located at the north end of the lot.
2.2 GEOLOGIC OVERVEEW
According to the Geologic Map of the Edmonds East and Part of the Edmonds West
Quadrangles, Washington by James P. Minard, dated 1983, the project site is located near the
contact between Transitional Beds underlying Whidbey Formation, as shown on the Geologic
Map, Plate 3.
Transitional beds consist of glacial and non -glacial deposits of fine grained sediments including
clay, silt and fine sand mostly deposited in lakes and fluvial systems in advance of the ice front
during the early Vashon Stade of the Fraser to Pre -Fraser glaciation time period. The Whidbey
Formation typically consists of bedded, compact, commonly oxidized, medium -to -coarse grained
Sand deposited as interglacial sediments of Pre -Fraser glaciation period.
2.3 FIELD INVESTIGATION
Geo Group Northwest, Inc., explored the subsurface soil and groundwater conditions at the site
by excavating four test pits on March 14, 2002. The test pits were excavated near the four
comers of the proposed condominium structure. Their approximate location is shown on the Site
Geo Group Northwest, Inc.
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page 3
Plan. Soil samples at varying depths were collected, classified and returned to our laboratory for
moisture testing.
2.4 Som CONDITIONS
The main portion of the site has been stripped of top soil. Underlying the top soil is loose to
medium dense weathered reddish brown SAND (Recessional Outwash?) to a depth of 1.5 to 4
feet below the existing ground surface. Underlying the Sand in places is a I to 2 foot thick layer
of medium stiff to stiff gray SELT to medium dense sandy SELT with some gravel. Suitable
foundation bearing soils were encountered at 3.5 to 4 feet and consisted of dense to very dense
silty SAND with varying amounts of gravel. Specific subsurface information is presented on the
test pit logs in Appendix A.
2.5 GROUNDWATER CONDITIONS
No groundwater seepage was encountered in the test pits, however some of the medium stiff Silts
and medium dense silty fine Sands below the reddish brown weathered zone are very moist in
places. It is important to note that groundwater levels can fluctuate seasonally, depending on
rainfall, surface runoff and other factors.
3.0 SEISNUCITY
3.1 PUGET SOUND SEiswc HISTORY
The greater Puget Sound area has experienced a number of small to moderate earthquakes and
occasionally strong shocks since records have been kept in the Pacific Northwest. The major
earthquakes in the region are believed to be associated with deep-seated plate tectonic activity.
Major faults within the region have not been active in the Holocene (geologic period dating since
the last glacial retreat 12,000 years ago), consequently, none are known to be associated with
historical seismicity.
The following seismically significant earthquakes have been recorded in the Puget Sound region:
Geo Group Northwest, Inc.
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page 4
Earthquake History
Location
Date
Richter Magnitude
Olympia
April 13, 1949
7.1
Seattle -Tacoma
April 29, 1965
6.5
Vashon Island
January 28, 1995
5.0
Duvall
May 2, 1996
5.4
Nisqually I
February 28, 2001
6.8
3.2 UNIFORM BUILDING CODE CLASSIFICATION
According to the 1997 Uniform Budding Code (UBC), western Washington is classified as
Seismic Zone 3 (Figure 16-2 in the U,BC), which is assigned a Seismic Zone Factor, Z, of 0.30
(Table 16-1 in the UBC). The soil conditions encountered at the site during our investigation
correspond best to a Soil Profile Type of Sc and Soil Profile Description of Very Dense Soil
(Table 16-J in the UBC). Based on a Seismic Zone Factor (Z) of 0.3 and a Soil Profile Type of
Sc the Seismic CoefficientCAis 0.33 (Table 16-Q in the UBC) and the Seismic Coefficient C, is
0.45 (Table 16-R in the UBC) for the site.
4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 GENERAL
Based on the results of our study, it is our professional opinion that the site is geotechnically
suitable for the proposed condominium development.
To mitigate potential settlement of the loose to medium dense weathered surface soils we
recommend excavating and compacting the site soils under slab -on -grade floors, sidewalks,
patios, driveways and parking areas as discussed in the Weathered Zone Preparation section of
this report.
Geo Group Northwest, Inc.
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page 5
The proposed structure can be supported by conventional spread footing foundations supported
directly on the dense to very dense site soils. The dense site soils were encountered at 3.5 to 4
feet below the existing site grade. Footing drains should be installed around the perimeter
foundation as discussed in the Drainage section of this report. Specific recommendations
regarding the site development are presented in the following sections.
4.2 SITE PREPARATION AND GENERAL EARTHwoRK
The former single family residence has been completely removed from the site and most of the top
soil and surface vegetation has been removed. Remaining surface vegetation and topsoil should
be removed in areas of the new building footprint, slab -on -grade floors, patios, driveways and
sidewalks.
4.2.1 Wet Weather Considerations
The onsite soils contain varying amounts of silt size particles and are susceptible to erosion and
are moisture sensitive. During very wet weather the onsite soils may become unsuitable for use as
structural fill material. If the onsite material is too wet to be compacted to the compaction
specifications, it may be necessary to dry or replace it with a more granular material.
Exposed soils should be protected from erosion and good site surface drainage should be
maintained. Water should not be allowed to stand in any area where footings, slabs or pavements
are to be constructed. Loose surfaces should be sealed by compacting the surface to reduce
moisture infiltration. Surface water should be diverted from draining into excavated footing and
utility trenches. Ponded water should be diverted to a settlement pond to remove silt prior to
discharge.
During wet weather we recommend leaving the subgrade several inches high in the area of floor
slabs to protect the moisture sensitive site soils. Final excavation can then be accomplished later
to remove unsuitable material and minimize exposure of the final subgrade to weather. We also
recommend that construction traffic be kept off the final subgrade. If construction traffic can not
be avoided, then we recommend the subgrade be protected with four -inches of 1-1/4 inch size
crushed rock, dependent on the disturbed site conditions and weather conditions.
Geo Group Northwest, Inc.
0
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 6
If stockpiled site soils are to be used as structural fill, it will be necessary to thoroughly cover the
material to prevent rainwater infiltration. Tarps should be anchored with sand bags to protect
them from wind. On dry days, tarps can be pulled back to assist in drying out the soil, if needed.
Generally, temporary erosion control measures should be installed around areas disturbed by
construction activity to prevent sediment -laden surface runoff from being discharged off -site. We
recommend temporary sediment control traps, the use of properly installed filter fabric fences,
storm drain socks, check dams, straw mulch, stabilized construction entrances, wash pads, and
other erosion control devices and techniques to provide temporary erosion and sediment transport
control. Temporary slopes that are exposed to weather should be covered with plastic sheets to
minimize erosion. Slopes not protected by plastic sheeting should be protected with straw mulch.
4.2.2 Weathered Zone Preparation
To mitigate potential settlement of the loose to medium dense weathered surface soils under slabs,
sidewalks, patios, driveways and parking areas, we recommend densi4ring the weathered zone by
removing the top 1.5 feet of the weathered Sandy material in these areas, compacting the
remaining subgrade with a large vibratory roller and placing the excavated soils back in
compacted lifts that meet the structural fill compaction standards discussed in the Structural Fill
Placement and Compaction section of this report. The contractor may want to complete this as
part of the site preparation, prior to the start of construction while the site is open, accessible,
with room to stockpile the excavated material.
4.3 STRUCTOUL FILL MATERIAL
All fill material used to achieve design site elevations below building foundations, slab -on -grade
floors, pavements or concrete flatwork such as patios and sidewalks should meet the requirements
for structural fill. The onsite soils contain silt size particles and are moisture sensitive,
potentially making compaction difficult during wet weather. During wet weather imported
granular soils can be used as structural fill, such as a gravelly Sand pit run, or the onsite sandy
soils can be cement treated as discussed in the Soil Cement section of this report. Granular fill
materials should be compacted with vibratory compaction equipment, such as a vibratory drum
roller or hoe -pack. During dry weather, any compatible non -organic soil may be used as
structural fill, provided the material is near the optimum moisture content for compaction
Geo Group Northwest, Inc.
*1 0
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 7
purposes. During wet weather, import material to be used as structural fill should have the
following specifications:
1. Be free draining, granular material, which contains no more than 5 percent fines (silt
and clay -size particles passing the No. 200 mesh sieve);
2. Be free of organic and other deleterious substances;
3. Have a maximum size of three (3) inches.
4.3.1 Structural Fill Placement and Compaction
All structural fill material should be placed at or near the material's optimum moisture content.
The optimum moisture content is the water content in soil that enables the soil to be compacted to -
the highest dry density for a given compaction effort. Structural fill should be placed in thin
horizontal lifts not exceeding 10-inches in loose thickness. Each lift should be compacted to the
minimum percentages shown in the table below, as determined by ASTM Test Designation D-
1557 (Modified Proctor), unless otherwise directed in the field by the geotechnical engineer at the
time of construction:
STRUCTURAL FILL RECOMMENDATIONS
Maximum Lift Thickness
I 10-inches (loose)
COMPACTION
APPLICATION % of Maximum Dry Density
ASTM D-1557 (Modified Proctor)
Under Pavements, Sidewalks, Patios
95% for the top 12-inches
& Backfill of Foundations/Basement Walls
90% below the top 12-inches
Under Foundation Footings
& Slab -On -Grade Floors
95%
Landscaping
87 percent
H
Geo Group Northwest, Inc.
0 0
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 8
4.4 SOIL CEMENT & SUBGRADE STABILIZATION
Sods that are over the optimum moisture content can be cement treated to moisture condition the
soil and improve compaction, subgrade condition, subgrade stability, and reduce construction
traffic impacts on the subgrade. Cement treatment may be a viable option to consider rather than
removal and replacement with an import material.
In general, cement treatment consists of tilling dry cement into the soil, creating a cement treated
base (CTB) that is a minimum of 12-inches thick. For very poor subgrade conditions the cement
treatment should extend down to the dense/firm soils. Prior to cement treatment the site should
be graded to prevent cutting or removing the 12-inch minimum thickness of CTB during the final
grading process.
The rate of application of the cement is dependent on the type of soil and the soils moisture
content and may vary from about 4 percent to 8 percent (43 lbs to 86 lbs per square yard by I -
foot deep). Based on our experience, a 5 percent cement content or an application rate of 6.5
pounds per square foot (58.5 lbs per square yard) should be adequate for the onsite weathered
Sand.
Site traffic (equipment, trucks, backhoes and forklifts) can soften areas treated with cement.
Yielding subgrade areas should be evaluated by the geotechnical engineer and if necessary we may
recommend applying additional cement treatment, or over -excavating and replacing with imported
structural fill, underlain by geotextile fabric. The CTB should be protected in heavy traffic areas
by covering with a minimum of 4 inches of 3/4-inch minus crushed rock or other imported soil
approved by the geotechnical engineer. It should be noted that the cement treated base can
harden to the point of having an impact on later site utility work, especially if higher cement
application rates are used.
Subarade Stabilization
The subgrade below parking areas and driveways should be compacted, then proof -rolled with a
piece of heavy construction equipment, such as a fully loaded dump truck, to verify the subgrade
is unyielding prior to paving. All proof -rolling should be performed under the observation of a
representative of Geo Group Northwest. Soft spots or disturbed areas may need to be removed
and replaced with compacted structural fill or crushed rock. If the subgrade is wet, or of poor
Geo Group Northwest, Inc.
0 9
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page 9
quality, we may recommend placing a woven geotextile, such as M[irA 500y" under the structural
fill to provide subgrade stabilization and separation of the materials.
4.5 ExCAVATIONS AND SLOPES
Excavations of up to 8.5 feet are anticipated along the south side of the building for footings.
Under no circumstances should temporary excavation slopes be greater than the limits specified in
local, state and national government safety regulations. Temporary cuts greater than four feet in
height should be sloped at an inclination no steeper than I H: I V (Horizontal: Vertical) in the loose
to medium dense soils, and I/2H:IV in the dense cemented sods. If open cut slopes of this
inclination or flatter cannot be constructed due to property fine or other restraints, temporary
shoring may be necessary, however the setbacks should allow the use of open cuts. Permanent
cut and fill slopes should be inclined no steeper than 211: IV. If groundwater seepage is
encountered during construction, excavation of cut slopes should be halted and the cut slopes re-
evaluated by Geo Group Northwest, Inc.
4.6 FOUNDATIONS
We recommend the condominium foundations be supported by conventional spread footings
placed directly on the dense to very dense underlying sites soils. Optionally, footings may be
placed on compacted structural fill that extends down to the dense site soils. Individual spread
footings may be used for supporting columns and strip footings for bearing walls. Our
recommended minimum foundation design criteria are as follows:
- Allowable Foundation Soil Bearing Pressure
(including all dead and live loads)
- Dense native soils
- Compacted Structural Fill
= 3,000 psf
= 2,000 psf
- Minimum depth to bottom of perimeter footing = 18 inches
(below adjacent final exterior grade)
- Minimum depth to bottom of interior footings = 18 inches
(below top of floor slab)
Geo Group Northwest, Inc.
0
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page 10
- Minimum width of wall footings
= 16 inches
- Minimum lateral dimension of column footings = 24 inches
- Estimated post -construction settlement
= 1/4 inch
- Estimated post -construction differential settlement = 1/4 inch
(across building width)
A one-third increase in the above allowable bearing pressures can be used when considering short-
term transitory wind or seismic loads. Lateral loads can be resisted by friction between the
foundation and the subgrade or by passive earth pressures acting on the buried portions of the
foundations. Our parameters for ffiction and lateral resistance are described in the following
section.
4.7 SLAB-oN-GRADE FLooRs
The bottom slab -on -grade floor may be constructed on the dense site sods or on compacted
structural fill that extends down to the dense site sods. To avoid moisture build-up on the
subgrade, slab -on -grade floors should be placed on a 6-inch thick capillary break, crushed rock
base. The crushed rock base should consist of crushed rock containing no more than five (5)
percent finer than the No. 4 sieve and a diameter ranging from 5/8 inch to 2-inches. A vapor
barrier, such as a 6-mil plastic membrane, can be placed over the capillary break beneath the slab
to reduce water vapor transmission through the slab. Two inches of sand may be placed over the
barrier membrane for protection during construction. Fills below slabs and the capillary break
material shall be compacted to structural fill specifications. We anticipate the soil subgrade
elevation below the slab will be at elevation 93.58 feet, 12-inches below the finished floor
elevation (4-inch thick slab, 6-inches of capillary break and 2-inches sand).
4.8 PERmANENT BASEMENT AND CANTILEVER RETAINING WALLS
The project will require basement walls up to an anticipated height of 8 feet. Permanent basement
walls restrained horizontally on top are considered unyielding and should be designed for a lateral
Geo Group Northwest, Inc.
-M
0 0
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page I I
soil pressure under the at -rest condition; while conventional reinforced concrete walls free to
rotate on top should be designed for an active lateral soil pressure.
Active Earth Pressure
Conventional reinforced concrete walls that are designed to yield an amount equal to 0.002
times the wall height, should be designed to resist the lateral earth pressure imposed by an
equivalent fluid with a unit weight of
0 35 pcf for level backfill behind yielding was.
At -Rest Earth Pressure
Basement walls supported horizontally are considered unyielding and should be designed for
lateral soil pressure under the at -rest condition. The design' lateral soil pressure should have an
equivalent fluid pressure of
0 45 pcf for level ground behind permanent unyielding walls.
For sloped ground behind the wall, a surcharge load equivalent to 50 percent of the soil height
above the wall should be considered in addition to the above active and at -rest soil pressures.
Passive Earth Pressure and Base Friction
The available passive earth pressure that can be mobilized to resist lateral forces may be
assumed to be equal to 350 pcf equivalent fluid weight for both engineered structural backfill
and undisturbed soils. The base friction that can be generated between concrete and
undisturbed bearing soils or engineered structural backfill may be based on an assumed 0.35
friction coefficient.
We recommend that a vertical drain mat, such as Miradrain 6000 or equivalent, be used to
facilitate drainage behind permanent concrete basement walls, as illustrated on the Typical
Footing Drain Detail, Plate 4. The drain mat core is placed against the basement wall with the
filter fabric side facing the backfill. The drain mat should extend fi7om the finished surface grade,
down to the footing drain pipe bedding material.
Geo Group.Northwest, Inc.
0
March 22, 2002 G-1516
Dayton Condominium, Edmonds Page 12
If vertical drain mats are incorporated into the design, the on -site soiti can be used as structural
backfill behind the walls, provided the backfill material can achieve the specified compaction. If
the native soil cannot achieve the specified compaction, then we recommend placing a free
draining granular backfill material.
As an alternative to installing a vertical drain mat, to prevent the buildup of hydrostatic pressure
behind permanent concrete basement or conventional retaining walls, a granular, free draining
structural backfiR material can be placed within a horizontal distance of 18 inches of the wall, in
place of vertical drain mats. The free draining material should be separated from the site soils
using a filter fabric geotextile, such as Mirafi 140N. We recommend using a clean, granular, free -
draining, structural fill material, free of organic or other deleterious substances, such as washed
rock or crushed rock, containing no more than five percent fines passing the No. 200 sieve based
on the fraction of material passing the No. 4 sieve. The free -draining granular material should
extend down to the crushed rock drainage blanket. The surface should be sloped to drain away
from the building wall. Alternatively, the surface can be sealed with asphalt or concrete paving.
Backfill material behind permanent concrete basement or conventional retaining walls should be
compacted to the specifications specified in the Structural Fill Placement and Compaction
section of this report. Compaction of the backfill is important for proper function of the
geotextile fabric on the vertical drain mat. The backfill in areas adjacent to basement or
conventional retaining walls should be compacted with hand held equipment or a hoe -pack.
Heavy compacting machines should not be allowed within a horizontal distance to the wall
equivalent to one half the wall height, unless the walls are designed with the added surcharge.
4.9 DRAINAGE
4.9.1 Surface Drainage
The finished ground at the site should be graded such that surface water is directed away from the
building and off the site. We suggest that the ground be sloped at a gradient of three (3) percent
for a distance of at least ten feet away from the building except in areas that are to be paved.
Water should not be allowed to stand in any area where footings, slabs or pavements are to be
constructed. During construction, loose surfaces should be sealed by compacting the surface to
reduce moisture infiltration.
Geo Group Northwest, Inc.
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 13
4.9.2 Footing & Wall Drains
We recommend that drains be installed around the perimeter of the foundation footings and
behind. The drains should consist of a four (4) inch minimum diameter, perforated or slotted,
rigid drain pipe laid at or near the bottom of the footings with a gradient sufficient to generate
flow, as illustrated on Plate 4. A vertical drain mat, Miradrain 6000 or equivalent, should be used
to facilitate drainage next to the foundation if the exterior grade is higher than the finished
elevation of the bottom floor. A discussion on the vertical drain mat is included M—the Permanent
Basement & Cantilever Retaining Wall section. A minimum of 18 inches of clean, free -draining,
washed rock, or crushed rock should be placed in the bottom of the footing trench
The perforated footing drain line should be bedded on, surrounded by, and covered with a free -
draining washed rock, crushed rock, or other free -draining granular material. The drain rock and
drain line should be completely surrounded by a geotextile filter fabric, Mirafi 140NL or
equivalent. The remainder of the foundation excavation may be backfilled with on -site soils or an
imported structural fill material. For the filter fabric portion of the vertical drain mat to function
properly, the backfill should be compacted to a minimum of 90 percent of the materials maximum
dry density as per the recommendations in the Structural Fill Placement and Compaction section
of this report.
Under no circumstances should roof downspout drain fines be connected to the footing drainage
system. All roof downspouts must be separately tightlined to discharge into the storm water
collection system. We recommend that sufficient cleanouts be installed at strategic locations to
allow for periodic maintenance of the footing drains and downspout tightline systems.
5.0 LEVMATIONS
This report has been prepared for the specific application to this site for the exclusive use of 548
Dayton LLC and their authorized representatives. We recommend that this report be included in
its entirety in the project contract documents for use by the contractor.
Our findings and recommendations stated herein are based on field observations, our experience
and judgement. The recommendations are our professional opinion derived in a manner
Geo Group Northwest, Inc.
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 14
consistent with the level of care and skill ordinarily exercised by other members of the profession
currently practicing under similar conditions in this area and within the budget constraint. No
warranty is expressed or implied. In the event the soil conditions are found to vary during site
excavation, Geo Group Northwest, Inc. should be notified and the recommendations re-evaluated.
6.0 ADDMONAL SERVICES
We recommend that Geo Group Northwest Inc. be retained to perform a general review of the
final design and specifications of the proposed development to verify that the earthwork and
foundation recommendations have been properly interpreted and implemented in the design and
construction documents. We also recommend that Geo Group Northwest Inc. be retained to
provide monitoring and testing services for geotechnically-related work during construction. This
is to observe compliance with the design concepts, specifications or recommendations and to
allow design changes in the event subsurface conditions differ from those anticipated prior to the
start of construction.
We appreciate this opportunity to have been of service to you on this project. We look forward
to working with you as this project progresses. Should you have any questions regarding this
report or need additional consultation, please feel free to call us.
Respectfully Submitted,
Geo Group Northwest, Inc.
Wade J. Lasse
Engineering Geologist
O-t� ala,
William Chang, P.E.
Principal
Geo Group Northwest, Inc.
m
ILLUSTRATIONS
G-1516
,JlKA RD
Fa
f\b
t.h
0
�cl
7m
gi
AV.
R 3 0�
>
!00
. . . . . . 41 N,
uj
00
A
4
TH
Aj
40
R-4.6 �11_1`.
S:
t6 I'm g Z�'
-AV'
y
A
P Avl 766:�
2 .
N
AV
It.,'9TH
�'VIOA 00
,-
AV.
71)04
4@
0
98TH
W7 _717
ISM -4: �Av
01
0
0
105 7.
OLY P C
0
to
0
133
1 IYOR' N
TH;
0 0
> :z 2
,".AV--; io
94 T
- lk
AV-
Ll,
0
R
_62ijn.
1�-1 AV W �lfim
, . .
a
L
un
� 7
,
Awe M, . I I . , , -
MST
P1
0-
CN
a 3
0-4
0
.,-
I
6
4V 4 .001
- - 7..
jj. : P ;5�_.
L Ic Ak ._7 . 17
--cr
AV
0-86111 Pt W
YY-
al
6 m
6111 86 ro
pr�
le 85TH
0
r -T�
DAYTON STREET Pmuieu 1 oemUHMAKK
PK NAIL AND 30 WASHER
AET IN TOP OF CURB
0 100, tLEVATION 97A3
Scale: I Inch - 100 feet 200'
-00"E
N900 0# 59.9
STRE
SIGN V�TER METER
AECIDUOUB TREE 40 DECIDUOUS
FENCE CORNER. TREE
OXNORTH & ON EAST �jffl-03
7.13- 7.50
,e
W.30 97.89
�7 08.03
FOUND -REBAR & CAP - LS 9175 X95.15 -- FEhq:E CORNER
10. ITEADT & 0.35'BOUTH OF CORNER 0-4'NORTH &
'.06. 1 ",-, I , d
X
x
98\
�k / 7
.3 WIRE FENCE WIRE FENCE I
YV006 FENCE
ROCKERY I
x 7-
fBET"6/8' RESi
I I" ALUMINU
X97.3 45 8.1
X96.2
W1REFEhCE
CONC.
-*TP-4' --gyph- -X91.7 �TP-3
98.4
9. r 19
xs
.2
9.7
0
WIRE FENCh x
> 140.1 END OF FENCE
11.5 '10 .0 1.2- WEST OF LINI
>
X98)1-
0 IV
7771171 Vj"I
�INISH FLOOR 4.U3'
ELEVATI q 102.00 0
00. 4
0 C 100AX
0
Xoh
qq
Como
A�j
01 101. (141"
562V
x1od.9
LOTIG
,1!62
& '11 0.001811 FT.
X�01.0
X
C)
X101.8
0.70
xv,
C
0
9.42
102.
eb 10i.
102.4 101.8
GARAOE
z INSIDE 0. 2.
X101.82 <102.3
9.79 -101"'DECIDUOUB TRE 0
�iO2.04
102
-)NCRETE----,�, TP-1 TfP-2
x X102.8 10211. GARAGE
03. 8.83' ON LINE
WIRE FENCE - "102.76 104.20
X102.81 --- xi I..,
0 ,_AS111 103.2
x
E D OF FENCE END OF FENG
24 WEST OF LINE 0.3'WEST OF I
104.
0 H
j '104.2 ^1Tj2o
GAS VALVEJ14- 04.44 MA X 0
o 0 104.24 4. 1 61 104.81
FX
/E
7X 21
I&CAP-1-80171 s�
iE-T -air RE-BkR-1
.071 NORTH OF CORNE� N89058'2 "-W 59,95, 13'ALUMINUM CA
EDGE OF ASPHALT ALLEY
FLOWLINE
-------- --------------------- --------------------- 34tam ------------- ---------------------------------- X104.05
Olt
01 fp� -,
0-1+� .4 - . -
J03,02 ORK okm-
POWER POLE
ALLEY
L
Partial Geolozic Section
Qm:
Marsh Deposits
Qvt:
Vashon Till
Qva:
Advance Oulhvash
Qtb:
Transitional Beds
Qog:
Olympia Gravel
Qpd:
Possession Drift
Q%v:
Whidbey Formation
a
0 1- 01 3060-
Approximate Scale: I inch =1500 feet
Adapted from the "Geologic Map Of the Edmonds East and Part of the Edmonds West
Quadrangles, Washington," by James P. Minard, Dated 1983
Alllff�— GEOLOGIC MAP
I Group Northwest, Inc. PROPOSED DAYTON CONDONJM�nUM
,am-- Geotechnical Engineers, Geologists, & 548 DAYTON STREET
EnvironrrentaiScienfists EDMONDS, WASHINGTON
scALE V= 15001 1 DATE 3/28/02 1 MADE WJL I CHKD WC I JOBNO. G-1516 I PLATE 3
0
Slope to drain
� C> 0 0
0 0 0 0 0
0 0 0 a I
COMPACTFD
ONSITE BA CKFTIZ
0 0 MA TERUL
(IF USABLA) 0
C> 0 C�
00 0 0 0
0 0
0 0 a
0 0 . . ............
GEOTEYTILE -
FYLTER FABRIC
(Mirafi 140 NL, or
equivalent)
Foundation Wall
WALL DRAIN
Free Draining Material, Minimum 4-inch diameter rigid slotted
(Crushed or washed rock) or perforated PVC pipe with positive
gradient to discharge
NOT TO SCALE
NOTES:
1.) Do not replace rigid PVC pipe with flexiible corrugated plastic pipe.
2.) Perforated or slotted PVC pipe should be tight jointed and laid with perforations
or slots down, with positive gradient to discharge.
3.) Do not connect roof downspout drains into the footing drain line system.
4.) Backfill on the exterior of the foundation should be compacted to 90% of the
maximum dry density based on Modified Proctor (ASTM D- 155 7). The top 12-inches
to be compacted to 95% of maximum dry density if backfill is to support sidewalks,
driveway, etc. Backfill below slab -on -grade concrete floors should be compacted to
95% maximum dry density.
TYPICAL DRAIN DETAIL
�Group Northwest, Inc. PROPOSED DAYTON CONDOMIN1UM
Geotechnical Engineers, Geologists, & 548 DAYTON STREET
Environmental Scientists EDMONDS, WASHINGTON
SCALE NONE J DATE 3/19/02 1 MADE WJL CHIM WC JOBNo. G-1516 I PLATE
.. a
APPENDIX A
TEST PIT LOGS
AND
SOILLEGEND
G-1516
Geo Group Northwest, Inc.
L -A
LEGEND OF SOIL CLASSIFICATION AND PENETRATION TEST
UNIFIED SOIL CLASSIFICATION SYSTEM (USCS)
NL%= DPASION
SYMBOL
TYPICAL DESCRIPTION
AR )RATORY CLASSIFICATION cRffmm
CLEAN
GW
WELL GRADED GRAVELS. GRAVEL -SAND
GRAVELS
MIXTURE LITTLE OR NO FINES
DETERMINE
Cc � =0') / (010 * OM b8bee 1 ancl 3
PERCENTAGES OF
GRAVELS
ffift or no
Gp
POORLY GRADED GRAVELA AND GRAVEL-9AND
GRAVEL AND SAND
COARSE-
"m Than Hatf
&-al
MIXTURES LITTLE OR NO FINES
FROM GRAIN SIZE
INICIT' MEE-ETING ABOVE REQUIREMENTS
GRAINED SOP
Coarse Grams
LwW Than No. 4
DISTRIBUTION
CURVE
ATTERSERG LIMITS BaOW
SI—)
DIRTY
r-M
SILTY GRAVELA GRAVELSANDSLT MIXTURES
'V LINE
GRAVELS
CONTENT
at P.L. LESS THAN4
OF FINIES
GC
CLAYEY GRAVELA GRAVEL-SANO-CLAY
ATTERSERG LIMITS ABOVE
tabsom
EXCEEDS 124A
fines)
MIXTURES
COARSE GRAINED
*A* LINE
SOILS ARE
or P.I. MORE7HAN 7
SANDS
CLEAN
Sw
WELL GRADED SANDS. GRAVELLY SANOr%
Cu-(D8QlDl0)q,svAmvmne
CLASSORM AS
FOLLOWS:
SANDS
LITTLE OR NO RNES
Cc - (DW) I (DIO * Daq behmem 1 and 3
Ron Than He
SP
POORLY GRADED SANEM GRAVELLY SAINIDS,
Ifts Than by
C— Q—
OW* " no
-c 5% Fem Gained:
W&ght LvW
Smaller Then No.
LITTLE OR NO FINES
GW, GP, SW, SP
NOT MEETING ABOVE RIMMIEMENTS
Then No, 200
4,SWwo)
DIRTY
Sm
SILTY SANDS, SW) -SILT MIXTURES
ATTERBERG LIMITS BELOW
*A' LNE
sieve
12% Ras Gained:
SANDS
GK GC� SK SC
CONTENT OF
FINES
.0 P.I. LESS THAN 4
Sc
CLAYEY SANDS, SAND -MA . Y MIXTURES
ATTERSERG LIMITS ABOVE
. *A�, LINE
Nvm scwm
fbm)
5 10 1216 FbW
Gamnet use dual
EXCEEDS 12%
smdww
vjM Pl MORE THAN 7
SILTS
Uquid Untit
ML
INORGANIC SILTS. ROCK FLOUR SANDY SILTS
toemw A4jm an
4,JWM
OF SLIGHT PLASTICITY
Pwft* Chart
-
Uquid Un*
MH
SILM
INORGANIC MICA=US OR
FINE-GRAMM
Negflghft
Oroaric)
SOILS
50%
DIATOMACEOI^ FINE SANDY OR SILTY SOL
CLAYS
UquW Lb"it
CL
INORGANIC CLAYS OF LOW
GRAVELLY,
(Almm A4Jm an
30%
SANDY, OR SILTY CLAM CLEAN
Pwmkfty Chatt.
CLAYS
z
Uqud Unit
CH
INORGMIC CLAYS OF MGM PLASTICITY. FAT
N""We
crommic)
� 5m
CLAYS
Mom Than NO bV,
WGigft L2qW
ORGANIC SILTS a
Uquid Unit
OL
ORGANIC SILTS AND ORGANIC SILTY CLAYS OF
Than No. 200
Slave
CLAYS
LOW PLASTICITY
(L
(Below A4jm an
Pfa� c3mo
UqWd Umtt
�Sm
Om
ORGANIC CLAYS OF HIGH PLASTICITY
1-1
AN
I
1
is
do
0 10 20 30 40 60 W 70 80 go IW 110
HIG�LY ORGANIC SOILS
Pt
PEAT AND OrHER HIGICY ORGANIC SOILS
UQUID UW (%)
SOIL. PARTICLE SUE
GENERAL QUIDANCEOF SOIL ENCIINEERING
PROPERTIES FROM STANDARD PENETRATION TEST (SPT)
ILL& STANDARD SIEVE
FRACTION
SANDY 300.3
SILTY & CLAYEY SOILS
Sirm
Ske
sieve
SIZe
(mm)
(mm)
Blow
Couft
Reladve
Ommity
Fdc*m
Angle
Des-ption
Blow
Counts
Uncamined
Skength
Omcnpdm
SLT I CLAY
OM
M075
N
%
0,
N
qu. tst
SAND
0-4
0-15
VOY Looss
-c 2
-c 0.25
very soft
FINE
m
CL425
9=
0.075
4-10
16-35
213-30
2-4
025 - Q50
So*
MEDIUM
010
zw
040
CL425
10-30
35-65
28-35
Medlurn Donee
4-8
mm - 1.00
k4edium Stiff
COARSE
04
1 4�75
010
zw
30-50
50
m-g5
85-100
35-42
38-46
Dense
Very Dense
8-15
15-30
1.00-2.00
ZW - 4.00
Sfiff
verysm
GRAVEL
FINE
4.7S
-30
> 4.W
Hard
COARSE
70
19
19
Group. Northwest, Inc..
COBBLES
76 mm to 203 mm
BOULDERS
mal
Geotechn" Enginmrs, Gecogists, &
ROCX
FRAGHEIM
mm
Ervvft me"W Sqiendm
13240 NE 20th ftea Suits 12 Bellemme. WA
ftm (42M 80.WW I= (42M S484M
PLATE Al
F-R=--x7,
-0.78m, numinvahamm
El
TEST PIT NO. TP-1_
LOGGEDBY WIL TEST PIT DATE: 3/14/02 GROUND ELEV. feet (=E)
DEPTH
Sample
Water
OTHER TESTS/
ft.
USCS
SOIL DESCRIPTION
No.
%
COMMENTS
SM
TOP S010L, dark brown silty SAND
S1
18.3
-pmbes easily to
SP to
SP-
SAND with gravel, reddish brown, medium to coarse, loose, and
S2
10.0
4 feet (base of
weathered zone)
Sm
trace to some silt, damp (weathered recessional outwash)
S3
9.0
5
I S4
17.0
Bearing soils
SM
Silty SAND with some gravel, gray, fine, dense, moist
below 4 feet
Pebbly SAND with silt, gray, very dense, cemented, glacially
I S5
10.9
consolidated, thin layer underlain by
Sm
S6
13.9
Silty SAND with gravel, gray, fine, dense, moist with occasional
cobbles & boulders (6 to 12 inches) (Transitional Beds -Th)
10
Total Depth = 8.5 feet, No Water Seepage Encountered
TP Location (-+): 6'E & 151 N of SW Comer of Lot
TEST PIT NO. TP-2—
LOGGEDBY WJL TEST PIT DATE: 3/14/02 GROUND ELEV. feet (+I
DEPTH
USCS
Sample
Water
OTHER TESTS/
SOIL DESCRIPTION
No.
%
COMMENTS
SP-
SAND with pebbly gravel, reddish brown, medium to coarse, some
SM
silt, loose, damp (weathered recessional outwash)
I S1
10.2
I S2
16.3
- probes S"-6"
SM
Silty SAND, gray, fine, medium dense, some gravel, moist
S3
15.8
Bearing soils
5
below 3.5 feet
Pebbly SAND with silt, gray, very dense, cemented, glacially
I S4
13.3
consolidated, thin layer underlain by
Sm
Silty SAND with gravel, gray, fine, dense, moist, with occasional
S5
11.4
cobbles & boulders (6 to 12 inches) (Transitional Beds -Th)
10
S6
14.3
Total Depth = 10 feet, No Water Seepage
TP Location (±): &W & 15'N of SE Comer of Lot
AML
Group Northwest, Inc.
Geotechnical Engineers. Geologists, &
Environmental Scientists
TEST PIT LOGS
DAYTON CONDOMINIUMS
548 DAYTON STREET
EDMONDS, WASHINGTON
JOB NO. G-1516 I DATE 3/18/02 1 PLATE A2
MMMOMMUME; -
TEST PIT NO. TP-3
LOGGED BY WIL TEST PIT DATE: 3/14/02 GROUND ELEV. feet
DEPTH
ft.
USCS
SOIL DESCRIPTION
Sample
No.
Water
%
OTHER TESTS/
COMMENTS
SM
TOP SODL, black silty SAND with some pebbly gravel
S1
16.5
-probes easily to
2.9 feet (:�) (base
SP-
SM
Gravelly SAND with some silt, reddish brown, loose to mediurn
dense, damp (weathered recessional outwash)
S2
7.7
of weathered
zone)
S3
19.2
NIL
SILT, gray, medium stiff to very stiff, moist
5
S4
I S5
17.7
14.7
Bearing soils
below 3 feet
NIL
to
SM
Sandy SELT to silty SAND with pebbly gravel, interbedded,
cemented lenses, very dense, moist (Transitional Beds -1b)
S6
11.6
Total Depth = 7 feet, No Water Seepage
T? Location (=E): &W & 17 S of NE Comer of Lot
10
TEST PIT NO. TP-4
LOGGEDBY WjL TEST PIT DATE: 3/14/02 GROUND ELEV. fe& (=Ll
DEPTH
Sample
Water
OTHER TESTS/
uses
SOIL DESCRIPTION
No.
%
COMMENTS
SM
Top Soil, black silty SAND with pebbly gravel, loose, damp
sm
Gravelly SAND with silt, reddish brown, medium to coarse, loose,
Sl
4.7
damp (weathered recessional outwash)
S2
18.7
probes 5"-6"
UL
SELT & SELT with some sand & gravel, gray, stiff to very
S3
17.9
jstiff,
moist
S4
10.3
Bearing sods
Sm
Silty SAND, gray, dense to very dense, some gravel, -moist
rjoist
5
below 3.5 feet
(Transitional Beds --lb)
Total Depth = 4 feet, No Water Seepage
T? Location (*): 6'E & 17 S of NW Comer of Lot
10
Group Northwest, Inc.
Geatechnical Engineers, Goobgists. &
Environffental Scientists
TEST PIT LOGS
DAYTON CONDOMINIUMS
548 DAYTON STREET
EDMONDS, WASHINGTON
JOB NO. G-1516 I DATE 3/18/02 1 PLATE A3
0�
RETURN ADDRESS:
City of Edmonds, City Clerk
121 5th Avenue North
Edmonds, WA 98020
CONFORMED COPY
20.0306260936 2-PGS
06-26-2003 02:19pm $20.00
SNOHOMISH COUNTY, WASHINGTON
DECLARATION OF RESTRICTIVE COVENANT
MULTI -FAMILY RESIDENTIAL
Reference #: 14da
Grantor(s): (I.) (2)_ Additional on pg._
Grantee(s): City of Edmonds
Legal Description (abbreviated): Sec��Twn 5?71,1 Rng_.��
Qtr 6u.)
OR Lot Block Plat V�zl,
Assessor's Tax Parcel J.D#(s): (1)
Assessor's . Tax Parcel 1D# not yet assigned
WHEREAS,
10&V & I - - / Z-- 7n
are the owners Of the following described real estate in the City of Edmonds, to wit:
Property Address:
Legal Description:
Assessor's Tax Parcel ID # (s): � /— 0/6 —00
AUTHORIZED FOR RECORDING
City of Edmonds
BY: Da
Page --Z of
W1.1EREAS,.the above named owners are desirous Of imposing a restrictive
covena,nt upon said premises in compliance with Section 19.00.040 of the.Edinonds
Community Development Code. WITNESSETH. that for and in
consideration of the premises, the above named owners do lereby declare an.d grant to
the City of Edmonds as Grantee the following restrictive covenant, to -wit:
. . That at the time of the execution of this Covenant the Grantors have agreed to' the
Ordinance of the City of Edmonds provide that no building for multiple family housing
may be erected on subject property containing more than units.
r JU r
Said Covenant shall be binding upon all present and future owners of said real estate and
their heirs, successors and assigns.
DATED this day Of Z
GRANTOR
State of Washington
I )ss
Countyof_KI�4�—
I certify that I know or have satisfactory evidence that D A 0 1b Q_,q L,
(is/*Pe) the person(.&)
who appeared before me, and said person(s) acknowledged that (be/she/they) signed this
instrument, on oath stated that (he/sbe/they) (is/are) authorized to execute the instrument
'and acknowledged it as the /-)
(title) of
6A�IP951_151!� to be the free and voluntary act of such party(jes)
for the uses and purposes mentions in this instrument. Subscr'ibe*d and sworn to 'before
me this _dayof_ -MANC- ,2001.
A 4A��
Notary Public in and for the State of Washington.
NOtay Pub0c
stcft of "Fe d I Aly commission expires 1/1 ulos—
APp*drnw* 80= An 16,2M5 AUTBORIZED FOR RECORDING
City of Edmonds
By: _&�_Date_
Page
of
J
L:\TEAlPNBUILDING\FORMS\RESTRICT-
of ED
0
0
C1W OF EDMONDS
121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220
RCW 197-1.1-970 Determination of Nonsignificance (DNS)
MITIGATED DETERMINATION OF NONSIGNIFICANCE
Description of proposal: The proposed project is a four unit condomini - urn project. Because the project
will require around 1,200 cu. yd. of grading SEPA review is required (City of Edmonds File No. ADB-2002-50).
Proponent: City of Edmonds
Location of proposal, Including street address If any: 548 Dayton St.
Lead agency: CITY OF EDMONDS
The lead agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment , An environmental impact statement is not required under RCW
43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other
information on file with the lead agency. This information is available to the public on request.
xx There is no comment period for this DNS.
This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14
days from the date below. Comments must be submitted by
Responsible Official: Steve Bullock
Position/Title: Senior Planner - Planning Division
Phone: 425-771-�0220
Address: City of Edmonds, 121 5th Ave
Date:
XX You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue
North, Edmonds, WA 98020, no later than July 26, 2002, by filing a written appeal citing
the reasons.
You should be prepared to make specific factual objections. Contact Rob Chave to read or ask about the
procedures for SEPA appeals.
xx Posted on July 12, 2002, at the Edmonds Public Library, Edmonds Community Services
Building, ai�d`the Edmonds Post Office.
XX Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the
Checklist.
Page I of 2
02=ED.DOC
7/12MISEPA
Taylor C1 COPY
Engineering
_T I
......... Consultants
From: Bill Taylor, P.E.
ado
To: City of Edmonds Permit Review
Date: June 18, 2002
0
TECHNICAL
MEMORANDUM
RECEIVED
JUN 2 4 2002
BUILDING DEPT.
Topic: Dayton Street Condominiums (Plan Check # 02-248) — Temporary Cut
Slopes vs. Shoring
This memo is submitted to complete the City of Edmonds requirement for addressing
temporary excavation shoring and/or cut slopes as a part of the building permit review.
The geotechnical report recommends temporary cut slopes as follows (see attached):
1 foot horizontal to 1 foot vertical (1HAV) for the loose to medium dense soil types
anticipated to be found in the upper layers at this site,
Y2 foot horizontal to 1 foot vertical (Y2H: 1 V) for the dense soils likely to be found in the
lower layers.
The general design proposal is to lay temporary construction slopes back at 1H:1V for the
upper 5 feet (±) of excavation depth, and then to lay the remaining excavation depth (subject
to the field confirmation of dense soils) 'back at Y2H: 1 V. This configuration should be
compatible,with the soils report recorTimendations.
There is an area near the landing to the basement doors on the west side of the proposed
building which. will need special attention by the contractor and project geotechnical engineer
to accommodate steeper slopes in order to install -a short section of. site retaining wall at this
location. The geotechnical engineer has indicated that this construction should be feasible
provided the soils are found to be stable at the time of excavation and the time of unsupported
slopes is minimized.
In consultation with the project geotechnical engineer and the architect, we have identified two
minor design changes that will be necessary to make the proposed construction compatible
with the design prem,ise stated herein. These are 1) the deletion of the small site retaining wall
at the west propertyJine in -lieu of steps at the north landing, and 2) the revision of the building
footings to have no i4nore than 2 feet of "heel". These revisions will be made with the response
to City comments prior to next submittal.
The information in this memo is submitted for permit review and approval. It reflects the
educated opinion of the design team consultants based on the information available and shall
not be construed as any guarantee of safety under field conditions, which can be variable and
unpredictable. It does not in,any way relieve the contractor from full and sole responsibility for
the safety of workers and the. protection of equipment and property during construction.
c. Lee Wangerin — project architect
Bill Chang — project geotechnical engineer
P.O. Box 1787 * Issaquah, Washington 98027-0073 * telephGa-liA ';;X 2.0 . 1 - IAI,% 0:71qx(r,425)391-1551
T'F
EE � i" �t�
March 22, 2002 G- 1516
Dayton Condominium, Edmonds Page 9
quality,'we may recommend placing a woven geotextile, such as Mirafi. 50OX, under the structural
fill to provide subgrade stabilization and separation of the materials.
4.5 EXCAVATIONS AND SLOPES
Excavations of up to 8.5 feet are anticipated along the south side of the building for footings.
Under no circumstances should temporary excavation slopes be greater than the limits specified in
local, state and national government safety regulations.
height should he_slop4�g:�����ha
to medium
inclination or flattCr
and 1/2H: IV in the
four feet in
I H: 1 V (Horizontal: Vertical) in th� loose
line or other restraints, temporary
shoring may be necessary, however the setbacks should allow the use of open cuts. Permanent
cut and fill slopes should be inclined no steeper than 2H: I V. If groundwater seepage is
encountered during construction, excavation of cut slopes should be halted and the cut slopes re-
evaluated by Geo Group Northwest, Inc.
4.6 FOUNDATIONS
We recommend the condominium foundations be supported by conventional spread footings
placed directly on the dense to very dense underlying sites soils. Optionally, footings may be
placed on compacted structural fill that extends down to the dense site soils. Individual spread
footings may be used for supporting columns and strip footings for bearing walls. Our
recommended minimum foundation design criteria are as follows:
Allowable Foundation Soil Bearing Pressure
(including all dead and live loads) = 3,000 psf
_ Dense native sods
- Compacted Structural Fill = 2,000 psf
- Minimum depth to bottom of perimeter footing = 18 inches
(below adjacent final exterior grade)
- Minimum depth to b ottom of interior footings = 18 inches
(below top of floor slab)
Geo Group Northwest, Inc.
1.0c I IN I ur or Wmd
ELEVATIO
2 00'
100, 200'
1,
Scale: I Inch - 100 feet
N90 0 0'0011E
N`90
9
STf
TTFR METER
SIGN
AECIOUOUS
TREE
4"DECIDUOLIS TREE
R N E R
FENCE CORNER
F A a
lXNORTH A O&EAST
T
01,
4c
FENqE CORNEF1
I
FOUND REHAR CAP - LS 9175
1.0.
0.15
NORTH 1.2-
1 XEAST A 0.3& SOUTH 01:FCORNER
.0.4
J8.1
x
x
,08.17
9 od
WRE FENCE
WRE FENCE
M06 FENCE
ROCKERY
x
f8Er&rREIL
ob
13- ALUMINU
98.2
WRE FENCE
CONC.
*TP_ T -3
.4
9.7r
WARE F N DEC
END OF FENCE
12 WEST Of LINI
0 .0
FilimsH FLOOR
ELEVATI - 102.01) 4.03'
100.4.
0
z Xio"
AfA
fDw \�()� �l / loi.cQ
8,22'
X106.9
LOT 16 11- 11.60180, FT.
�01.0 tn
70
N;
0
cr 0.42 102.7
GARAGE
14- 0 o.r
01.62 02.3
9.70
C=OVS THE
0244
102--
)NC EFE TP-I TP-2
X_ 102.0 102.7.1 a.aw oNu
X03.
W F CE- f'.. )'104.20 03.2
7a '102.81
Ilk
x END Of FEND
E 'WEST OF U O.Y WtST OF I
2 NE
03.86 104.�
x
0 t. , " )o I . ... I
0 > 154.2 ^IC14.20
> 04,44
-011 M OAS VALVE 04.24
00
7 2
n I&CAP-LB9115 11w SET ala, REBAR I
T 59.95, WAI UMINOM CA
0 07' NORTH I.' I N89,05812
OF ORNEq
0
LOGGEDBY WjL
TEST PIT NO. TP-1
TEST PIT DATE: 3/14/02 GROUND ELEV. feet (:L)
DEPTH
Sample
Water
OTHER TESTS/
ft.
USCS
SOIL DESCRIPTION
No.
%
COMMENTS
SM
TOP SOLL, dark brown silty SAND
S1
18.3
-probes easily to
Sp to
S2
10.0
4 feet (base of
SAND with gravel, reddish brown, medium to coarse, loose, and
weathered zone)
Sp-
Sm
trace to some silt, damp (weathered recessional outwash)
S3
9.0
5
S4
17.0
Bearing soils
SM
Silty SAND with some gravel, gray, fine, dense, moist
below 4 feet
S5
10.9
Pebbly SAND with silt, gray, very dense, cemented, glacially
consolidated, thin layer underlain by
Sm
S6
13.9
Silty SAND with gravel, gray, fine, dense, moist, with occasional
A
cobbles & boulders (6 to 12 inches) (Transitional Beds -Th)
L!j�
10
—
Total Depth = 8.5 feet, No Water Seepage Encountered
TP Location (:L): &E & 15'N of SW Comer of Lot
TEST PIT NO. TP-2
LOGGEDBY WjL TEST PIT DATE: 3/14/02 GROUND ELEV. feet
DEPTH
Sample
Water
OTHER TESTS]
ft.
USCS
SOIL DESCRIPTION
No.
%
COMMENTS
SP-
SAND with pebbly gravel, reddish brown, medium to coarse, some
SI
10.2
Sm
silt, loose, damp (weathered recessional outwash)
I
S2
16.3
- probes 5"-6"
SM
Silty SAND, gray, fine, medium dense, some gravel, moist
S3
15.8
Bearing soils
below 3.5 feet
Pebbly SAND with silt, gray, very dense, cemented, glacially
S4
13.3
consolidated, thin layer underlain by
Sm
Silty SAND with gravel, gray, fine, dense, moist, with occasional
S5
11.4
cobbles & boulders (6 to 12 inches) (Transitional Beds -Th)
S6
14.3
10
Total Depth 10 feet, No Water Seepage
T? Location (±): 6'W & 15'N of SE Comer of Lot
Group Northwest, Inc.
Geotechnical Engineers,.Geologists,
Environmental Scientists
TEST PIT LOGS
DAYTON CONDOMINIUMS
948 DAYTON STREET
EDMONDS, WASMNGTON
JOB NO. (3-1516 1 DATE 3/18/02 1 PLATE A2
TEST PIT NO. TP-3
GED BY WJL TEST PIT DATE: 3/14/02
DEPTH USCS SOIL DESCRIPTION
ft. I -
L I SM I TOP SOEL, black silty SAND with some pebbly gravel
10
Sp- I Gravelly SAND with some silt, reddish brown, loose to medium
SM dense, damp (weathered recessional outwash)
NE SILT, gray, medium stiff to very stiff, moist
NE Sandy SELT to silty SAND with pebbly gravel, interbedded,
to cemented lenses, very dense, moist (Transitional Beds -Th)
Sm
LOGGED BY
Total Depth = 7 feet, No Water Seepage
TP Location (±): 6'W & 17 S of NE Comer of Lot
TEST PIT NO. TP-4
TEST PIT DATE: 3/14/02
DEPTH SOIL DESCRIPTION
ft. USCS
sM Top Soil, black silty SAND with pebbly gravel, loose, damp
Sm Gravelly SAND with silt, reddish brown, medium to coarse, low
damp (weathered recessional outwash)
NIL SILT & SELT with some sand & gravel, gray, stiff to very stiff,
moist
5 Silty SAND, gray, dense to very dense, some gravel, moist
ransitional Beds -Th)
illss
Sm T(ST I
10
Total Depth = 4 feet, No Water Seepage
TP Location (±): 6'E & 17 S of NW Comer of Lot
-------------
Group Northwest, Inc.
iew Geotechnical Engineers, Geologists, &
Environmental Scientists
GROUND ELEV. feet (±)
Sample
Water
OTHER TESTS/
No.
%
COMMENTS
Sl
16.5
-probes easily to
2.9 feet (±) (base
S2
7.7
of weathered
zone)
S3
19.2
S4
17.7
Bearing soils
below 3 feet (±)
S5 1 14.7
S6 1 11.6
GROUND ELEV. feet
OTHER TESTS/
COMM
% FCOMM7ENTSS'
S1 4.7
S2 18.7 - probes 5"-6"
S3 17.9
S4 10.3 Bearing soils
below 3.5 feet
TEST PIT LOGS
DAYTON CONDOMINIUMS
548 DAYTON STREET
EDMONDS, WASHINGTON
JOB NO. G- 15 16 -
I DATE 3/18/02
PLATE A3
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONOS, WA 98020 - (425) 771-0220 FAX (425) 771-0221
Website: www.d.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
C. Taw) Planning - Building Engineering
May 21, 2002
Lee Wangerine
12408 106th Place NE
Kirkland, WA 98034.
GARY HAAKENSON
MAYOR
Re: Plan Check 02-248, Old address 548 Dayton Street (demolished), New
address 550 Dayton Street (proposed 4 Unit Condos).
Dear Mr. Wangerine:
This letter is to inform you of the new address for the proposed 4 Unit Condo.
The new address is 550 Dayton Street. I will inform all City Divisions including
Fire, Police, Utility Billing, Public Works and Building.
lt-is-your-reqmnsibility-to-inform-the-Post-Office-and-all-othen*nterested-partie f
this correction. We apologize for the inconvenience this may cause you and
greatly appreciate your cooperation.
Sincerely,
ZI-
Y&Nirlrl��
Development Services
Cc: Fire Department
Police Department
Utility Billing
Public Works
Building Official/Street File
Incorporated August 11, 1890
Sister City - Hekinan, Japan
COTY OP
'100 DAYTON ST. - EDMONDS, WASHINGTON 98020 - (206)
2
DEPARTMENT OF PUBLIC WORKS
March .16, 1981
Dear Resident:
HARVF H. HARRISON
MAYOR
On February 17, 1981, the Edmonds City Council passed
Resolution 488 for construction, reconstruction and repair
of deteriorated sidewalks. A pUhlic hearing will be held
in the Council Chambers at the"Civic (*'enter on April 21,1981
at 7:30 P.M._ You are invited to at.�.cnd this hear�-tng_for
discussing rep�ir of portions. 6E.:de*e6rioeated�',"Si'd'e-',';'�a'
t : . 1-1k
abutt ing you' r--- proper ty*--�-`—` The---`im�3r'o';Ve�i6ii-t
need of rer ' )air at the expense of the abutting propertv
owner is provided by City Ordinance, Chapter 7.20 and.'
Revised Code of Washington, Chapter 35.68.
The areas needing repair have been marked in pai i nt on
the sidewalk adjoining your property. Reconstruction�-and
repair of these sidewalks must 'be Completed on or before
September 1, 1981. In the event improvements are not'
completed within the above specified time, the City will
perform and complete the improvements at'. the�expense�oE the
abutting property owner.
This action is' in response to many citizen re . quests
and pedestrian falling accidents which have beer) increasing
in recent years as a result of sidewalk deterioration and
increased pedestrian traffic.
Sinc'erely,
FRED F. HER7"BERG
Director of Public Works
STREET FILE'
,ty 0%
B U LICENSE APPLICATION '��D!AT LICEN'SE NO.
CITY of EDMONDS slots
Civic Center Edmonds, Washington 98020
City Clerk Phone 775-2525 ANNUAL FEES PENALTY AFTER FEB. 15
HOME OCCUPATION
CLASS YEAR C.EFFEC.DATE REASG. $10.00 (A) ADDITIONAL $5.00 El
INSTRUCTIONS:
• All items must be completed 71 0 SMALL BUSINESS
or application will not be ac- RECEIPT NO. DATE PAID T'X' A- $15.00 (B) ADDITIONAL $7.50. 0
PRIN
IN SPEC. BOX -
ISSUE OF
cepted. FOR EJ Business with 10 or
• Sign and return application P FE PAID PENALTY PAID CORRE.CTED more employees ADDITIONAL $25.00 0
1 : LICENSE WITH
with fee. Renewals received I I /I I' I 'LC' ACTION. $50.00 (C)
after February 15 must pay NEW APPLICATION
(LA)
'penalty in addition to fee. 0 RENEWAL (LB)
NEW BUSINESSES AFTER 0 CHANGE (LC)
JULY 31, 1/2 FEE. (PLEASE MAKE ANY NECESSARY CHANGES) 0 DELETE (LD)
NO. OF EMPLOYEES
-P, /A/ /2 2/ V A) d 61 17 1/ 4 - P) 6- (-19
NAME OF FIRM BUSINESS PHONE
MAILING ADDRESS NATURE OF BUSINESS
J-V-7 Z-)Nyrnil m141 qc(Io
�_j
e L6 I
INDIVIDUAL PARTNERSHIP CORPORATION
BUSINESS ADDRESS
(S) P)
0 NERS.-NAME - HOME ADDRESS
'F 0,0
IY7A) X(V W4 5�
E PFJQNE TDATE OF BIRTH PLACE OF BIRTH SOCIA SECURITY NUMBER
5� - 4-2 -07- ZY IrIA"
EMERGENCY NOTIFICATION: (1) NAME & TELEPHONE 'aq
(PLEASE LIST TWO) (2) NAME & TELEPHONE
WASHINGTON STATE TAX NO. APPLICANT'S SIGNATURE 17J_1,X1.e
DO NOT WRITE BELOW THIS LINE
STAFF *REVIEW:.
FILL IN LAND USE CODE, LIFIR NUMBERS, ZONING, ETC. CHECK APPROVAL OR
DISAPPROVAL, DATE, AND SIGN. IF DISAPPROVAL, PLEASE COMPLETE "COMMENT"
SECTION-. ROUTE TO NEXT DEPARTMENT ON LIST. RTPFFT F11 F
PLANNING DEPARTMENT
Be'APPROVE 0 DISAPPROVE DATE-3 - a �r LAND USE CODE ZONING CODE
_r) E I r.� JC_ I I
SIGNATURE
CONDITIONAL USE PERMIT
,qO,3
COMM ENTSCAa,(,CVtj_( C,�, JL_
BUILDING DEPARTMENT DATE 7V Build'
:1199 0 Hotel/Motel (L)
9"APPROVE 0 -DISAPPR . OVE SIGNATURE Permit 0 Apt. Bldg. (A)
Office Bldg- (0)
Occupancy El Restaurant (R)
COMMENTS: Grou 0 Hosp/Nurs Home (H)
CAPACITY: (NO. UNITS, APTS.. OFFICES, SEATS, BEDS, STUDENTS) El School (S)
FIRE DEPARTMENT DATE U. F. 1. R.
APPROVE 0 DISAPPROVE SIGNATURE EV:e-t
COMMENTS:
POPCE DEPARTMENT
--l-11"APPROVE 0 DISAPPROVE D AT E SIGNATURE
COMMENTS -
PUBLIC WORKS DEPARTMENT
ER'-A—PPROVE El DISAPPROVE DATEq—.q'__7f SIGNATURE
rw
COMMENTS:
ag')NO(Ow-gs.-acy .16H-4i "OlylpigKO 4
0
Z
H
Z
H
U
Z
W
Address
Street Right -of -Way Existing REQD
Access. Easements Existing IREQD
..,Utility Easement Existing REQD
Lot.per Subdivision Plat Assessor Map!�--.ij)�/q 2tj
Site Plan Checked for Accuracy &/1 .1 17A
Underground Wiring Reqd..
Check Accuracy of Legal Description
Environmentally Sensitive.Area
Environmental Checklist Reqd. -------
Flood Hazard Zone
Shoreline Management Area ----
Slope, Soil, Vegetation
Stream, Creek, Drainage Basin
Existing Zoning Per Code
Anmities Design Board Approval-Reqd. ADB # Approval
Board of Adjustment Approval Reqd.
Review By: Date:
Existing Water Main Size
Water Main Reqd.
Service Line Reqd.
Hydrant Size Existing
Hydrant-Reqd. Per Fire Code Size
Detector Check Meter Reqd.
Cross Connection Inspection
Fire Department Camients
Water Meter Charge Reqd.
Review by:
septic 'ranK I)esign Approved
Septic Tank Permit Reqd.
Sanitary Sewer Availability
Drawing No.
Side Sewer Availability
Sanitary Sewer Connection Fee Reqd.
Review By:
Date: it; C
te:
Permit No.
Proi . —
File No.
Date:
Open Ditc-li Existin. Reqd.
Culvert Reqo. Size
Catch Basin Reqd. Indicate on Site Plan
S hou.1der drainage maintain collection on swale open rwoff
?,Lu-�hole rcqd. Indicate on Site Plan
Soil Conditions and Gr'ouiid Water. Field Che.cked
Rovie%,7 by 111 to
�Street Paving Reqd.
Curb and Gutter Reqd.
Sida,,alk Reqd.
Curb Cut for Driveway Reqd.
P4 Right -of -Way Construction Permit Reqd.
Bond Reqd. for Public Improveme-nts
Street Name Sign Reqd.
Other Signing Reqd.
--1 0
n- Pre Permit Site Inspection made on
0
BY: S5,,1ER
WATER
S=,,T
ENGINEERING
Special, ke�uirements listed in mew to Com=ity Developmeant DeparLiT)2nti
Building� -Division
BY D6te
o All iteus filled in on Building Permit Apolication
BY ate
D,
P" Drawings Sta=ed and Notations �lade
BY Wte
lApproved by Public Works Deparom-it
Revised: IV 10-1977
----------
LAI P (t). Tz.
GOP i vt�l
:�W=
2,C)
-tUQ)
LID
T IEEF,
ILE
1 4
i I t
J,
-j- J- i
I t
A
LOCATE REQUEST NUMBER
LOCATES"'
DATE CALLED:
FOREMAN/CREW FUTURE SERVICE: ��S NO
COMMENTS BORE: CUT:
DRAWING LOCK- DATE. 10 / i
-UNLOC INITIAL: -10�91
ACCOUNT: G - 02-4)(
METERSHOP ROUTE/SEQUENCE X-04�L-ow
FOREMAN
UTTLITy AA
BILLING
SUPPLIER:
TREATMENT PLANT
SIZE
RESIDENTIAL
APARTMENT -
OFFICE
COMMERCIAL
CH,
LOCK 0 f/4
UNLOCKED k
UNITS
UNITS
UNITS
Citk, )f Edmonds - Water Depacient
TAP CARD
Mete No. Reading: noco
Size4"Y- 3/4
Mfgrs. o. 6,--Y':�41 Style'-:; --TRP L
P urchaser: 0 A(Z-v Fo ao rAc--v c P-
550 CO r-c)O 0" -.4--ur'5
Serv. Add.
Billing Address:
Name 5-50,
Street 2-0
city Os 9 802-C -34
Date: � 0/\ 4 5- Receipt: -
.,1 311
Meter Size:4� X Y4! 6-L Meter $
Connection $
1
Street Cut $ Permit #
Meter Location F--". n;7 -V(ZP*L-
Service Material: 4"k 'D \
Pressure lbs. GPM
Date of Work 1'0/4/0 By:
Proj. No:
Remarks: Jez- c.LD
f
550 DI :57F
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
Website: wwwdedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
�1 a\) manning 9 Building Engnee, ng
C. 1 Z5
Letter of Transmittal
Date: July 12, 2002
To: Environmental Review Section
Department of Ecology
PO Box 47703
Olympia, WA 98504-7703
Subject: 548 Dayton St., Edmonds File #ADB-2002-50
GARY HAAKENSON
MAYOR
Transmitting Mitigated Determination of Nonsignificance, Environmental
Checklist, Site Plan. & Vicinity Map
For Y�ur Information: X
As you requested:
For your file:
Comment:
Note attachments: X
Sincerely,
Diane Cunningham, Administrative Assistant
Cc: AT&T Broadband
Dept. of Fish & Wildlife
DOT
PSRC
Snob. Co. Planning IN r
Snob. Co. PW CITY COPX
Edmonds School District
Community Transit
Lee Wangrin
Incorporated August 11, 1890 0
Sister.City - Hekinan, Japan
A
0
CITY OF EDMONDS
121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220
RCW 197-1.1-970 Determination of Nonsignificance (DNS)
MITIGATED DETERMINATION OF NONSIGNIFICANCE
Description of proposal: The proposed project is a four unit condominium project. Because the project
will require around 1,200 cu. yd. of grading SEPA review is required (City of Edmonds File No. ADB-2002-50).
Proponent: City of Edmonds
Location of proposal, including street address If any: 548 Dayton St.
Lead agency: CITY OF EDMONDS
The lead agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment.* An environmental impact statement is not required under RCW
43.21.030(2)(c). This decision was made after review of a completed environmental checklist and other
information on file with the lead agency. This information is available to the public on request.
XX . There is no comment period for this DNS.
This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14
days from the date below. Comments must be submitted by
Responsible.Official: Steve Bullock
Position/Title: Senior Planner - Planning Division
Phone: 425-771-0220
Address: City of Edmonds, 121 5th Ave
Dat 9:
XX You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue
North, Edmonds, WA 98020, no later than July 26, 2002, by filing a written appeal citing
the reasons.
You should be prepared to make specific factual objections. Contact Rob Chave to read or ask about the
procedures for SEPA appeals.
xx Posted on July 12, 2002, at the Edmonds Public Library, Edmonds Community Services
Building, a the Edmonds Post Office.
XX Distribute to nChecked" Agencies on the reverse side of this form, along with a copy of the
Checklist.
Page I of 2
02MEDDOC
7/12102.SEPA
ED
0
$73�3
11, V, Z
CITY OF EDMONDS
R PC I k* 02
ENVIRONMENTAL CHECKLIST VED
MAY !' 9 2002
PERMIT COUNTER
Purpose of Checklist.
The State Environmental Policy Act (SEPA), chapter 43.2 1 C RCW, requires all governmental agencies to consider the environmental
impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with
probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help
you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to
help the agency decide whether an EIS is required.
Instructionsfor Applicants:
This environmental checklist asks you to describe some basic information about your proposal. Governmental, agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if
a question does not apply to your proposal, write "do not know" or does not apply". Cornplete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if
you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there
may be significant adverse impact.
NOTE: Projects generating new traffic will be required to submit a Traffic Study prepared by a licens ed Professional Civil Engineer.
Specific requirements for the Traffic Study may vary depending upon the project, and will be provided by the City Engineer upon
request. * Please contact the Engineering Division at 425-771-3202 for specific study requirements. City review of the Traffic Study
may require assessment of the "Development Project Peer Review" fee of $45 plus the cost of the review.
Use of checklistfor nonprojectproposals:
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete
the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as
"proposer," and "affected geographic area," respectively.
A. BACKGROUND
1. Name of proposed project, if applicable: 4��VOOAVVWAIS
2. Name of applicant: -545 QAY7-VJ1,
3. Address and phone number of applica nt and contact person:
49-2,5-(, A10 027-Hur 0
6-1=�,--- "'WA
(.42S)
Page I of 24
sepi checklist - pubfic.doc:4.18.2001
.'0
4. Date checklist prepared: AAA±1;e 2-27 2"2Z'
5. Agency requesting checklist: ofEdmonds
6. Proposed timing or schedule (including phasing, if applicable): ':�/71F
tox a ed 3 -XD '-M -gen--w
Aly 7-/ -r, / eA eovov,��,577 0 -IJ 1"AR-c-4 2-OOS,
(STAFF COMMENTS)
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this
.proposal? If yes, explain.
(STAFF COMMENTS)
8. List any environmental information you know about that has been prepared, or will be prepared, directly related
to this proposal.
(STAFF COMMENTS)
9. Do you know whether applications are pending for governmental approvals of other pr . oposats directly affecting
the property covered by your proposal? If yes, explain.
A10
(STAFF COMMENTS)
Page 2 of 24
scpa diecklist - public.doc:4.18.2001
V -
10.. List any government approvals or permits that will be needed for your proposal, if known.
7-S
(STAFF COMMENTS)
11. Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page.
A- 4-411VIr
0/-- A AA10
F-Loore-s OP ow6w-JW& U/V/ 7S /'W0j(4',9' , IS
a r 15 goo :sg One,— r
Bq7 :5 4 a A-a,� L4
(STAFF COMMENTS)
12. Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
56;0 DAYTbd STV-4�, 4E5V/V6fJP-S, WA '19-02-0
L-o7-�S /6 e /7 Or 6"C�4 121 Ad OAJ 7w,--,
PL,4r OF 0/= dw-DIMOIDS: /-:h jAl val-umt5
e;,F RLA '/Z� ri PWevvir -31 IAI 5,41b)4,pA4j.54 COA1216 WAS.41AI6�7W.
(STAFF COMMENTS)
sepa chealist - public.dDc:4.18.2001
Page 3 of 24
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous4�
(STAFF COMMENTS
b. What is the steepest slope on the site (approximate percent slope)?
(STAFF COMMENTS)
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know
the classification of agricultural soils, specify them and note any prime farmland.
51013 w 0 C-LA
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe._
wo
(STAFF COMMENTS
Page 4 of 24
up checkW - public.doc:4.18.2001
e. Describe the purpose, type and approximate quantities of any filling or grading proposed. Indicate source
of fill.
.eVe,i-/A-T70fJ Off heifP-OX , 14-2'02 6- Y. r-JeS t3L)JA;;D1#J6- 00'20' AWAZOX -'E 0
C. )or -or- fzl,-L, 0/,/ 56"774 . 5106 e)F- 1-07- F%0-- Sd91--A-e-e P.J-RK4A4—,
(STAFF COMMENTS)
L Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
e--'-)Ln-p eP-oo�-= 7p -n-fe A10124-2�-
-a.V -ro 0A-tf7-DAJ "J
(STAFF COMMENTS)
g. About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
(STAFF COMMENTS)
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
0) pgooO
dviAl
2- " QeO� 9 6 "' W1 CWAIA) 7?0-�-:44 WrO� -�4' * go CA-- A F 5 1 FeAJ cv--
OUAeOZY :S0'AA-,L5- i2" D��We 4-r C-nU5W-J-Cr.,00 &A 7-0 T)4a SeV-77�,
(STAFF COMMENTS)
2. AIR
2. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial
wood smoke) during construction and when the project is completed? If any, generally describe and give
approximate quantities if known.
I Lf V074 i -S AIr ZT665qz6, 14WAox.
VC- ill c4-O OfJ S ^ '
TgjP-S P--P- QA-f oitritu& 2---3 PAYS 41,4kimJM),
A-F7-c?e
(STAFF COMMENTS)
Page 5 of 24
sepa cheddW - pubfic.doc-.4.18.2001
b. Are there any off -site sources of emissions or odor that may effect your proposal? If so, generally describe.
(STAFF COMMENTS)
C. Proposed measures to reduce or control emissions or other impacts to the, if any:
6- COPS-MU071004 - WiLi- AE WZP—# Tb A MINJ
- 4J000rz0Vz—'r> taA I
(STAFF COMMENTS
3. WATER
a. Surface:
I zoi-i-no-OL- !
(1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into.
(STAFF COMMENTS
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? "If
yes, please describe and attach available plans.
(STAFF COMMENTS
(3) Estimate the amount of fill and dredge material that would be placed in or removed from'surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
NJ 0 0-'e
(STAFF COMMENTS)
Page 6 of 24
3cpa checklist - public.doc:4.18.2001
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
(STAFF COMMENTS)
(5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
N 0
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and, anticipated volume of discharge.
IV 0
(STAFF COMMENTS
b. Ground:
.(I) Will ground water be withdrawn, or will water be discharged to ground water? Give general
description, purpose, and approximate quantities if known.
(STAFF COMMENTS)
sepa checkUg - pubfic.d=4.18.2001.
Page 7 of 24
(2) Describe waste material that will be discharged into the ground from septic tanks or other so ' urces, if
any (for example: Domestic sewage; industrial, containing the following chemicals ... ; agricultural;
etc.). Describe the general size of the system, the number of such systems, the number of houses to be
served (if applicable), or the number of animals or humans the system(s) are expected to serve.
(STAFF COMMENTS
C. Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters?
If so, describe.
W
4ngr- 4ddeleE t252�AA lf"12- AML) So,177�-' 61�6-
W
64a A L-1camAj.*01i toleE: AT- 774C
IY-EW lAirc, T*,L- e-ny �%7'cKm PoCA-IAJ Ar OA7-m.,J -1746'
WAiUYL MLIL- TWO-d 171� ioy7y 1006e-l- 500100.
(STAFF COMMENTS)
(2) Could waste materials enter ground or surface waters? If so, generally describe.
mitif M ki, Po SS I is) t' i Vy' - TV /S I S S1WA1,L,'&=jog-W,7AL-
Mosr or- TM5 IS W,Tl4itj 'TW 60L�Cljme:r
(STAFF COMMENTS
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
WaW 0a7-UAJ7-10-J SYS7�1u, 6AJ /JOfZ774 !310if OPF- 511U. Oki 5J J-77-1 510E
MRKIIJ67- 4-or S 6A-r-S- 6AS*J �ViLe, V?,4P
AJD 5U!;00----PZ: ebl-4-v —�IVAJ-/7S, J;Ag :SYST?z�_T J,,JJL�(- /tfo�7-
L"4C.4y- C'oDas ,
(STAFF COMMENTS)
Page 8 of 24
sepa d=kfia - pubHc.dDcA.18.20D1
4. Plants
a. Check or circle types of vegetation found on the site:
deciduous tree: alder, maple, aspen,.other:
V evergreen tree: fir, cedar($t�in—e)
other.
shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other:
water plants: water lily, eelgrass, milfbil, other:
other types of vegetation:
(STAFF COMMENTS)
b. What kind and amount of vegetation will be removed or altered?
-'PtrJa T)407W -r-y 6& o V err-> -1-D AL4- o W 1::br— 6oAjc-;-gmyeVoA)
(STAFF COMMENTS)
C. List threatened or endangered species known to be on or near the site.
0 AJ -t�-
(STAFF COMMENTS)
Page 9 of 24
sepa d=klist - publiCADCA.19.2001
d. Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site,
if any:
Al-L AA�nS Aledwur--� 13qjLo10& Alor to,4-�r&D tolL.L, t?,F
joi,AWTV 11112� A VMeia-" Or 5815ddg z'W'0 79c-E-'5. S fff
/--I P4-AIJ)
(STAFF COMMENTS)
5. Animals 0a 5eYzV-P-L>
2. Check or circle any birds and animals which have been observed on or near the site or are known to be on
or near the site:.
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other:
(STAFF COMMENTS)
b. List any threatened or endangered species known to be on or near the site.
AIOld
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
(STAFF COMMENTS)
Page 10 of 24
sepa dieddist - public.doc:4.18.2001
CU
d. Proposed measures to preserve or enhance wildlife, if any:
pJILL- r�,I,-- &U
: &AAj�tfp
(STAFF COMMENTS)
6. Energy and Natural Resources
a. What kinds of energy �electric, natural gas,.oil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
—.0
V -J,
hk-�T)—�S , AoJO ffflocca ifLAe-�-S, A/ze- Az�,—
(STAFF COMMENTS)
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
describe.
(STAFF COMMENTS)
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts,. if any:
1A1-W"0V77ofJ 4) I�J t6,vr— Iti W414, S 4 <-/O UXOZI'�
(STAFF COMMENTS
sepa dieckha - pubfic.dw-.4.18.2001
Page I I of 24
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk. of -fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
NO
(STAFF COMMENTS
(1) Describe special emergency services that might be required..
(STAFF COMMENTS)
(2) Proposed measures to reduce or control environmental health hazards, if any:
At 0 17'V)c'1 C, S. it 6 -,T39 #J A<c-- Pl< O:Te-47'eO -ro diar U-SeD AJO
0A) 7V00'<_4 eqrrYsj,& s ;;�e se-eij
(STAFF COMMENTS)
b. Noise
(1) What types of noise exist. in the area which may affect your project (for example: traffic, equipment,
operation, other)?
IV
(STAFF COMMENTS
I
Page 12 of 24
sepa chacklist - public.doc:4.18.2001
I
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise
would come from the site.
e �DAJ uc,7-1 a 12 0j0,--r_,4Z7-0 J9 LN414-IAI& &VA)S I.. 50ma
VeEHI e,445 Z2!�! �--E' C- 0A1 Ai-c-ffY 1-0 IH-C- 750L/77-f
/-+V a e__5 4/K -
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
7W/IPS WJI-if R_-E AffLk> -r-O 4 My A// A4 VIV.
(STAFF COMMENTS)
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
- VA7-A-^1'T_ i-O-r. .4 hbO5-C-, _
(STAFF COMMENTS)
b. Has the site been used for agriculture? If so., describe.
JV0
(STAFF COMMENTS)
Page 13 of 24
sepa d)eckW - public.doc:4.18.2001
c. Describe any structures on the site.
(STAFF COMMENTS)
d. Will any structures be demolished? If so, what?
610 9 .14JAS DDA)k� Aj M A72 C-14,
(STAFF COMMENTS)
e. What is the current zoning classification of the sitel
(STAFF COMMENTS)
L What is the current comprehensive plan designation of the site?
A d L,1-1 r—A/K i I- Y &6-d _Q91J511Y
(STAFF COMMENTS)
g. If applicable, what is the current shoreline master plan designation of the site?
tJOT-
(STAFF COMMENTS)
Page 14 of 24
sq* checklist - public.doc:4.18.2001
h.. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
AJ-0
(STAFF COMMENTS)
i. 'Approximately how many people E:oulDresid or work in the completed project?
A - / -)-
(STAFF COMMENTS)
j. Approximately how many people would the completed project displace?
(STAFF COMMENTS)
L Proposed measures to avoid or reduce displacement impacts, if any:
(STAFF COMMENTS)
1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
(STAFF COMMENTS)
Page 15 of 24
sepa checklist - public.dDc:4.18.2001
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income
housing.
—4 0 X 171��, AA 10 0 1- E r-b .,�kC-;r74 /A[6pAAZF7.
(STAFF COMMENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income
housing.
(STAFF COMMENTS)
C. Proposed measures to reduce or control housing impacts, if any:
A-fr-LA ca-is L-o
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
"0' wa 00,
(STAFF COMMENTS
Page 16 of 24
sepa diecklist - pubfic.docA.18.2001
b. What views in the immediate vicinity would be altered or obstructed?
MOOF
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
-I.- OF -17�& &0LzYjJ&
2. - A�Z� -
kCvVc-E� 0<IV�W" � C-OK6 C-U7- 7-0 A 1"lAbMato
(STAFF COMMENTS)
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
---�Omg . 5voi &Vj4LJ00Lt).S:
ay Arl-e�-) Ild LA-rt-� AF70K,00-bfJ
(STAFF COMMENTS)
b. Could light or glare from the finished project be a safety hazard or interfere with views?
Alo. AL-1, L- 1:5> Z)Ala�- - W,4y- eFAKT-,
(STAFF COMMENTS
C. What existing off -site sources of light or glare may affect your proposal?
(STAFF COMMENTS
Page 17 of 24
wpa chock[W - pubUc.doc:4.18.2001
d. Proposed measures to reduce or control light and glare impacts, if any:
(STAFF COMMENTS)
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
I le
seuiW op C-u-�Y 4AAJ->iA1C—,e ClVlc,- cewrm-K- /��.AY r-lei-o
5-r, ff 7V4 A*��,). L-16P,44y, IA'1410 '711-4 A,yv-.)
(STAFF COMMENTS)
b. Would the proposed project displace any existing recreation uses? If so, describe.
-Alo
(STAFF COMMENTS
C. Proposed measures to reduce or control impacts on recreation, including recreation bpportuhities to be
provided by the project or applicant, if any:
(STAFF COMMENTS
Page 18 of 24
sepa checklist - public.doc:4.18.2001
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers
known to be on or next to the site? If so, generally describe.
JV0
(STAFF COMMENTS
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance
known to be on or next to the site.
A10 AJ 45
(STAFF COMMENTS)
C. Proposed measures to reduce or control impacts, if any:
A)
(STAFF COMMENTS)
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the existing street
system. Show on site plans, if any.
Y=,J Z�,<JVeF!�J� CWIL-t, opl�W. 007 b QlMtJ ST,
.12AII�n AJ
(STAFF COMMENTS
Page 19 of 24
wpa diecklist - public.doc:4.18.2001
07
b. Is site currently served by public transit? If no, what is the approximate distance to the nearest transit
stop?
0 ChS-17wJe--r` 7D /A�-Y57'7- &IS '5rvif; 0 LACxoss; DAqrD1J S�T'.)
-r-D —1rZA-tfJ cseea-r ml�-6s
1,71 5vw C-a 7z Fi5r�v " 0'.�� mw6ls
(STAFF COMMENTS)
C. How many parking spaces would the completed project have? How many would the project eliminate?
(STAFF COMMENTS)
d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not
including driveways? If so, generally describe (indicate whether public or private).
JV0
(STAFF COMMENTS)
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so,
generally describe.
EiV-,/C'f A114a-,S 7-b 72it!r 44J'Zw�i
7P—A-IAJ D07'10'r /:S7 Q,!!; M f TV
(STAFF COMMENTS)
Page 20 of 24
sep d=kfio - pubfic.dov.4.18.2001
f. How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur.
--3-5 . 1?:21OP5 E--S
(STAFF COMMENTS)
g. Proposed measures to reduce or control transportation impacts, if any:
-1901ZOZZ--,� /S C,4-ctsS 1D040A/7Z"),J W11741d 67MY'
(STAFF COMMENTS)-
15. Public Services.
2. Would the project result in an increased need for public services (for example: fire protection, police
protection, health care, schools, other)? If so, generally describe.
10MAi, 1AJe4ez-'A--5
(0 71t&4- t4AJj 17S
(STAFF COMMENTS)
b. Proposed measures to reduce or control direct impacts on public services, if any:
(STAFF COMMENTS)
Page 21 of 24
sepa checklist - public.doc:4.18.2001
16. Utilities
a. . Circle utilities currently available at the site: �e=lectrici Xn=aiural Wld�aa�ter, 1��OjEph�oDne-
.nitary�sewer- septic system, other:
(STAFF COMMENTS)
b. - Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
SM614VM(Si4 eWrlt- P'Y-10, -WCW VAWd-r 4v0,U&--90AJ 00-SM-E
00941- PUCN--r 500WO L-A69-- t5De&-K- T-1E -IoS -0a) -PAY70N 5r,
WATL-YL r szw.Ex 1, CLYAIPic- View WA7Z-:K 5eW*A - '57rF---6r -rlC- - i0l) -S Z�'�) DAYMO YT,
-r&t.e,-.4o oo P- - a, -no Ad - *,"&- -,,,J 0-4 5 oo V4 5) DZ-� OP -S I T6
(STAFF COMMENTS)
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to
make its decision.
Signatur4)Proponent
Date Submitted
Page 22 of 24
sepa checklist - public.doc:4.18.2001
Exis,nNo
10 SIDE SETaAC
3r H. SOLLARD
(30 FC AT
SIDEM K)
ARCHEDAR801
ENTRY
IN STREET SETE
CONC. SICEWAt
CONIC.
RETAINING WAI
Ir H. CEDAR FEN
Soevi" LAND
31r H, 13OLLARD L
12, ON CENTER
(30 F/C AT SIOEVW
I&REARSETBAC
vxu
TRANSFORMERF
ASPHALT CONCRE
PROPERTY LINE
DAYTON STRE&I-7
LAWSCAM
MEAM SW
LANDSCAPE LIGHT
ROCK CIRCLE
W SIDE 4
ETBACK
LIGHT
+
.9-6,
kCK
4'- 2- 6--01
AZ
i CON
RETE
RETI
NINGWALL
L
DAYTON
CONDOMINIUMS
!o
IPR
CEDAR FENCE
GHTS
kLK)
K
AKA
..........
ILANDSCAPED
ol
Aft�
kD
PARKING
(3 SPA S) H. CEDAR
TRASH
ENCLOSURE
-
ALLEY
NOTE: SEE CIVIL DWG. CO.2 FOR SITE DEMOLITION SITE PLAN NORTH
WORK. Scale: 4=--W-W
wq
ho
S�t
A
st �r
YTON V " ST
I "IPROJECT
LOCAT16-N
HOWELL I VVY
VICINITY MAP
SCALE:- N.T.S.
DALEY I ST
.. . ... :LSPF
EDIJ
BELL ST
MAIN ST
DAYTON STI
!m E
lk
lmo-Irm
ST
ST
Lo
10
ST
E-
MAIN ST
MAPLE ST
00
ST
McConnell, Jeanie
From:
Gebert, David
Sent:
Monday, June 21, 2004 1:53 PM
To:
Miller, Noel
Cc:
Bowman, Duane; Fiene, Don; Lemcke, Pam; Chrisman, Lyle; McConnell, Jeanie; Hawkins,
Jaime; Klein, Linda
Subject:
Illegal discharge - 550 Dayton St
ENS �.
Illegal Discharge
concrete sl...
Noel,
Attached for your review and signature is letter to Rinker Materials regarding their illegal discharge this morning.
Dave
June 21, 2004
Certified Mail
Rinker Materials
6300 Glenwood Avenue
Everett, WA 98203
Re: Notice of Civil Violation:
Illegal Discharge Into City Storm System at 550 Dayton Street
Dear Rinker Materials:
An illegal discharge incident was brought to my attention on June 21, 2004. On
Monday, June 21, 2004 at approximately 10:20 AM, a Rinker Materials worker (Mr.
Gary Claymore) was observed washing concrete slurry from a Rinker concrete transit
mixer (license #A5851 1 S/truck #8493) at the project located at 550 Dayton Street.
Cement residue/slurry was observed in the street gutter and entering the catch basin in
front of the property at 550 Dayton Street. A correction notice was posted at 550
Dayton Street on June 21, 2004.
The storm drain system flows directly to the Shellabarger Creek system and then to the
Union Oil Marsh. The system is intended for storm runoff only and the water receives no
treatment downstream, which means that fish and wildlife habitat are impacted by any
pollutant discharges.
The discharge of untreated wastes to the City's stormwater collection system
constitutes a violation of Edmonds City Code 7.200 and is subject to enforcement
actions. Payment of a fine to cover administrative and remediation cost associated with
this violation is authorized in accordance with Edmonds City Code 7.200.150.
In accordance with these regulations you are hereby directed to: ,
1. Pay a fine of $300 by July 9, 2004 to cover administration and remediation
costs associated with this violation.
�P
Rinker Materials
Page 2
2. Report back to the City regarding the proper Best Management Practices that
will be employed in future operations by your organization when conducting
business within the City of Edmonds. Attached is a Best Management
Practices -handout for Contractors that can be used as guidance in
accomplishing this requirement. The City will consider reducing the $300 fine
based on your response to this matter. Your written response is requested by
July 2, 2004. Failure to respond in writing by this date may result in further
fines and/or additional penalties.
You have the right to appeal this order and assessment of fine in accordance with the
provisions of ECDC 20.110.040(C). Written notice of appeal must be received by the
Director within 10 days from the date of this notice.
If you have any questions regarding this information, please feel free to contact me at
425-771-0235 or Pam Lemcke at 425-771-0220.
Sincerely,
Noel F. Miller, P.E.
Public Works Director
cc: Hartford Contracting, 5525 Lakeview Drive, #200, Kirkland, WA, 98033
Dave Gebert, City Engineer
Don Fiene, Assistant City Engineer
Pam Lemcke, Engineering Specialist
Jim Kammerer, Street/Storm Manager
Attachment
—C
. I S,)z
PERMIT NO: 9984.
C Of Edmond's'
y 0 0�z)
PERMIT EXPIRES. �� A
SIDE SEWER.PERMIT'-
Address of Construction
Property Tax Account R
Attach'copies o - f all access and utility easements 'Verified and Approved b
Owner and/or Contractor:
Contractor License Building Permit 200 5-/-- 8. 5
E] Single'Family. Invasion into City Right -of Way: F-1 Yes 2<o
Iti-Family (No. of Units *RW Construction Permit.#
Amu
F� Commercial (No. of Units Cross other "Private Property: El Yes 0
Public "Attach legal description and copy of recorded easement.
0 Knfe"'r--or contrac ror s 6wied Dafe
�ip/atiire_�_ndack�n gement statement:
By signing for tffi&j16rmit I certify that I have read the City's public hand * out -entitled
ide Sewer, Specifications, and shall, comply with all City requirements outlined - therein.
�tL 555)
9 CALL DIAL -A -DIG (1-800-4 5 BEFORE ANY EXCAVATION 9:
W.:FOR INSPECTION CALL 425-771-0220 exfensio
24 HOUR NOTICE REOUTRED FOR ALL INSPECTION REOUESTS
NOTE: IF JOB SITE -IS NOT READY FOR INSPECTION.WHEN
INSPECTORARRIVES A $45 RE -INSPECTION FEE WILL BE CHARGED.
Job Site. Ready YES - NO .—Date: Initial:
Partial Inspection: Date: Initial:
Partial Inspection:
Date: Initial:
FINAL INSPECTION APPROVE*D: Date: Initial: As -built to Street File: E]
'6- PERMIT MUST BEPOSTED.ON JOBSITEt,
White Copy: File Greep Copy: Inspector.' Buff.Cok ApplicaPt
L;temp;bldg,forms;ssperTnitjlg4/0 0
�lk
Le
Llkq LAAV�Til�l-r
FM
�o re, I � /a /0 s (-V (e-, <� s o
Z-q tKUP3 WAX-
'51 GQ
po S-�Gp
City of Edmonds Pern-dt No: '4V#qnd1(#-7
RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date:
A. Addres's or Vicinity of Construction:
LB.T (ZAILALT-S 3-1,4 S-1-A-4 I —� CL41— :tkI:*�_CLA '61
ypp'of Work (be specific): - 11 I I -
T", 6ontrac-t , or: S-I'A�T.� ELECTRIC & INVEST COIWdtact: MORRIS GELLER
Mailing Address:1 7 9 2 5 HWY 99 LYWOOD,WA Phone: 425-745-1996
StateLicense#: STATEE169QG
City Business License #:
D. Building Permit # (if applicable):
E. F� Commercial
F� Multi -Family
INSPECTOR:
El Subdivision
El Single Family
Liability Insurance: - Bond:$
Side Sewer Permit # (if applicable):
F] City Project El EUC (PUD, VERIZON, PSE, COMCAST, OVWSD)
F1 Other
W
F. PAVEMENTCUT: 0-YES El NO G. SIZE OF CUT x
CONCRETE CUT: LJ YES F-1 NO
G. F� Mail Approved Permit F-1 Call for Pickup
APPLICANT TO READ AND SIGN
INDEMNITY. Applicant understands by his/her signature to this application helshe holds the City of Edmonds harmless from
injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of
Edmonds or an-v of its departments or emplQvees, including but not limited to the defense qf an-v legal proceedings including defense
costs and attorneyfees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS
COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THEAPPLICANT.
# Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every
flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the
required training in their possession.
* Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -
approved material prior to the end of the workday - NO EXCEPTIONS.
+ Three sets of construction drawings of proposed work are required with the permit application.
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
I HA VE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE
THA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS
4$t-g�_ature.' Date:
(oontr'actor or Agent)
FORCITY USE'ONI
Approved -,by:
Time Authorized: Void After
Special Conditions:
REQUIRED INSPECTIONS:
Y,
Ri.ght-of-4,vay-fe.e.- 1-/ 5
Disruption Fee/Fdu`d':I1'1:'
'Inspection: Fee: 19 -06
Totaffee'.
Receipt�No:,,
y:.
Issued* b
4—
Call 425-771-0220, Ext. 1326for a 24-hour voice -recorded inspection request line.
FINAL APPROVAL OF PERMITTED WORK:
Inspector's Signature
DATE:
C\Documents md SettingsTurtis\My Documents\Fomis\Engnrng\ROWpemit_.doc Revised 10/01/03
City. of Edmonds Permit No."
DA
RIGHT'OF-WAY CONST4UCTIONTE11MIT Issue, 'te:
A. Address or Vicinity of
B. Type of Work (be specific): 1
C Contractor: llnelilzl&mAae� Contact:
Mailing Address: -4,) Ae4kW Phone:
State License #: //Noro�," 9,�7 Liability Insurance: 0?�� Bond: S 110;�11&26V
D. Building Permit (if applicable): Side Sewer Permit # (if applicable):
E. r-1 Commercial El Subdivision El City Project E] EUC (PUD, VERIZON, PSE, AT& T, OVWD)
Xulti-Family. Single Family F-1 Other
M
INSPECTOR: C
F. PAVEMENT CUT: [-I YES El NO' G. SIZE OF CUT X
CONCRETE CUT: YES NO
Al'I'LICANT TO IZEAI) ANI) SIGN
INDEMNITY. Applicant understands by his/her signature to this application helshe holds the'City of Edmonds harmless ftom
injuries, damages or claims of any kihd or description whatsoever, foreseen or unforeseen, that may be'made against the City of
Edthonds or any of its departments or employees, including bu't,not limited to, the defense of any legal proceedings, including defense'
costs and attorneyfees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINA L,
INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS
COMPLETED BYCITYFORCES, AT WHICH TIMEA DEBITOR CREDITW7LL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT,
Traffic control -and public safety shall be in accordance with City regulations.as required by the City Enginur.� Every
flagger must be trained as required by (WAC) 296-155-305 and must,have certification verifying completion of Jhe
required training in their possession.
Restoration is to be in accordance with City codes. All street-c ut trench work shall, be patched with asphalt or City -
approved material prior to the end of the workday - NO EXCEPTIONS.
Three sets of construction drawings of proposed work are required with,the permit application.
CALL DIAL -A -DIG (1-800-424-5555)'PRIOR TO BEGINNING WORK
I HA VE READ THE ABO VE STA TEMENTS AND UNDERSTAND THE PERMIT RE QUIREMENTS AND A CKNO WLEDGE
4.1 THA T I MUST MAKE THE PINK COPY OF THE PE E AT ALL TIMES FOR INSPECTIONS
VAILABLE ON SIT
> Signature:,
or Agent)
Date:-
WL76MLM
'.UPON.COMPLE * TION OF PERMITTED WORK9 AN ENGINEERING FINAL
INSPECTION IS REQUIRED PER CHAPTER'18.00 OF THE EDMONDS
_C OMMUNITY DEVELOPMENT CODE (Phone 425-771-02.20, Ext. 1326)
FINAL APPROVAL. OF PERMITTED, W-ORK.- DATE:
Inspector's Signature
For inspection requirements -see Engineering Inspection Information handout.
'4
DAMy Docuinents\Forms\Engftmg\ROWpormit—.doc
City of Edmonds Permit No: 2aO 07 3
RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: ze-0,
T"o, -
A. Address or Vicinity of Construction:
B. Type of Work (be specific): 6
C. Contractor: �_,j RcAA a Contact: Fc7T&_)�/
Mailing Address: 10 51 & ft 1251CAU Phone: 412 2105f��
State License ;C *-Ciflef Liability Insurance: Bond: $
City Business License #:
V
D. Building Permit # (if applicable): -200 3 —0 35 2 Side Sewer Permit # (if applicable):
E. Commercial F1 Subdivision F1 City Project F1 EUC (PUD, VERIZON, PSE, COMCAST, OVWSD)
Multi -Family El Single Family F-1 Other
INSPECTOR: 17V A/A Wl< t N -S Cokf CS
F. PAVEMENT CUT: YES El NO G. SIZE OF CUT x
CONCRETE CUT: YES R� NO
G. El Mail Approved Permit Call for Pickup
APPLICANT TO READ AND SIGN
INDEMNITY. Applicant understands by his/her signature to this application helshe holds the City of Edmonds harmless from
injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of
Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense
costs and attorneyfees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND A CCEPTANCE OF THE WORK. ESTIMA TED RESTORA TION FEES WILL BE HELD UNTIL THE FINAL STREET PA TCH IS
'COMPLETED B Y CITY FORCES, A T WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT
+ Traffic control and public safety shall be in accordance with City regulations as required by theCity Engineer. Every
flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the
required training in their possession.
# Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -
approved material prior to the end of the workday - NO EXCEPTIONS.
+ Three sets of construction drawings of proposed work are required with the permit application.
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
I HA VE READ THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE
THA T I MUST MAKE THE PINK. COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS
Signature: ��l q2t_ Date:
"-(Contrafitor dwr Agent)
XSE 'O,N L� Y�
��Approved -by:,
r
A W A 6e�
Thiie Authorizeg: Vdid Mt&,:
�Digitotibfl
�Sp&ial Cohditions.
5
13F r 7-4� #2 Cg�_) A/Q/
-1-/ 0 AALIL
k"k;--r-A
lRer... T6tal,F6�; "J... �7'
]&Arc PkOA4 Al-L
-/7- 0
J
ol�
'Ll 7-'/ Reeeipt:Nd:..*,��,
(W& rE e, Cc Lora,
C44 �'ZQC_A�
S'Sue
REQUIRED INSPECTIONS:( KAlc tc-IC CC) Aj r-1ZCL
7
Tf Nt At -Kk S 7-ne A 7-10 A.'
Call 425-771-0220, Ext. 1326for a 24-hour voice -recorded inspection request line.
FINAL APPROVAL OF PERMITTED WORK:
Inspector's Signature
DATE:
rM&
CADocurnents and Settings\Cuilis\My Documents\Fomis\Engnmg\ROWpemit_.doc Rcvised 10/01/03 -
DATE RECEIVED
[PERMIT EXPIRES
CITY OF EDMONDS
USE PERMIT
ZONE NUMBERJ&52��/
4
CONSTRUCTION PERMIT APPLICATION
JOB SUITE/APT#
ADDRESS
t6D bW r,� ST 02-
OWNER NAME/NAME OF BUSINESS
PLAT NAME/SUBDIVISION NO,
LOT NO.
LID NO.
LID FEE $
F_)Aaf9>
MAILING ADDRESS
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
TESCP Approved 0
RW Permit Required 0
z
-7-f-k A
0'� 1401 vz t-)(L5'
EXISTING — PROPOSED
Street Use Permit Req'd 0
Inspection Required 0
Side.alk Required 0
CITY ZIP
TELEPHONE
0 0 E31
4zp 0 2- (.�-) - -T&) S-
REQUIRED DEDICATION— FT
Underground
Wiring required 0
NAME
METER SIZE
LINE SIZE
S
PRV REQUIRED
L
777
YES 0 NO 0
a
3
Uj
ADDRESS
REMARKS
z
z
L)
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROL/DRAINAGE
a
A4
z
w
CITY ZIP
TELEPHONE
6 T3
NAME
H-iye-iry?-o
-ENGItERINP� REVIEWED/DATE
cc ADDRESS
0
FIRE REVIEWED By DATE
W
z CITY zlp��
TELEPHONE
0
645_1ta V a iE 4.80�,s
11 00 2,f�,l
Lz
VARIANCE OR CU
SHORELINE OR-4DB4
INSPECTION
BOND
STATE LICENSE NUMBER EXPIRATION DATE
BY
AAYVI i Vn AT P
REO'D
POSTED
HftieT F& 10 69 4-if
0 YES XNO
SEPA REVIEW
SIGN AREA
HEIGHT
"A"
PROPERTY TAX ACCOUNT PARCEL' NO
COMPLETE EXEMPT
ALLOWED PROPOSED,-
LL40WED PROPOSED
W 00Liii3L42_12:.I-016q0
i;�
EXP I
NEW RESIDENTIAL�, PLUMBING MECH
LOT COVERAGE .
ALLOWED PROPOSED
L9F61ftD.SETBACK$ (FT.)
FRON ,&*)'REAR
E?`WKTfftD SETBACKS (FT.)
FRONT -.-,IJR 51DE REAR
AUDITION COMMERCIAL COMPLIANCE OR
C-h -a r, e—I
Irt-
A.,
z
CHANGE OF USE
z
PARKING VIDED I
REO'D I PRO,
LOT AREA I
PLANNING REVIEWED By DAfE
REMODEL APARTMENT
C3 SIGN
I I
n o a n jq
n 1c,
GRADING 0 FENCE'.
REPAIR 13, CYDS X FT)
HLMAHKS
.11b of rp-11. it), COWL SC+10-a(,V- %;6 a-531 ma
OTHErMjj�,
DEMOLISH TANK JK
dtkV- fAA (,*Q Ct W ry) 0' 0
Z GARAGE R OETA' NNG WALL RENEWAL
C RPORT R CKERY
pyorv:!" dcc* 3.331 SO,
0
P (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN-
CHECKED BY
TYP_UW CONSTRUCTION
ICODE
OCCUPANT
2:
e0A)POA41dItAMS
I:Y:A
GROUP
R 2
NUMBER
NUMBER OF
CRITICAL
SPECIAL INSPECTOR
AREA
OCCUPANT
OF
'0
DWELLING
AREAS
STORIES
UNITS
NUMBER
REQUIRED C:] YES
I
LOAD
DESCRIBE WORK TO BE DONE
REMARKS
PROGRESS'INSPECTIONS PER UIBC 108/FINAL INSPECTION REQ D
WIT"4
z
a
VALUATION
FEE
7�—
PLAN CHECK FEE,
HEAT SOURCE GLAZING % LOT I SLOPE %
UILDI
PLAN CHECK NO: VESTED DATE
U5 .1 2, Un 0
MECHANICAL
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
BE DONE ON PRIVATE PROPERTY ONLY, ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC,) WILL REQUIRE
GRADING/FILL
SEPARATE PERMISSION.
STATE SURCHARGE/Qj,
Uj PERMIT APPLICATION: 180 DAYS
PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
ENG. REVIEW FEES
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
;APPLICANT, ON BEHALF OF HIS OR HER SPOUSE. HEIRS, ASSIGNS AND SUCCESORS
ENG. INSPECTION FEE
Uj N INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
i
LANDSCAPING
2 EDMONDS, WASHINGTON, ITS OFFICIALS. EMPLOYEES, AND AGENTS FROM ANY AND
INSP EE
< ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
* FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
PLAN CHECK DEPOSIT
RECEIPT",
* DEEMED TO MODIFY, WAIVE OR REDUCE ANY REOUI REM�NT OF ANY CITY ORDINANCE
_j
01 NOR LIMIT IN ANY WAY THE CITY'S ABI LITY TO ENFORCE ANY ORDINANCE PROVISION."
RECEIPT -
TOTAL AMOUNT DUE
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
APPLICATION APPROVAL
GIVEN IS CORRECT AND THAT I AM THE OWNER, OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
CALL
This application is not a permit until signed by the
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
Building Official or his/her Deputy: and Fees are paid, and
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
FOR INSPECTION receipt is acknowledged in space provided.
WORKMEN'S COMPENSAT9 AND RCW 18.27.
,01,NRANCE
DATE
SIGNATURE (OWNER OR EGENT) DATE SIGNED
(425)
WSIG jE
1 -
3/05—
771-0220
_ 'I A
A -
RE ED BY D*E
ATTENTION
EXT 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
771-0221
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
FAX
ORIGINAL - FILE YEI I OW - INS4CTOR
PINK -OWNER GOLD - ASSESSOR
5198
DATE R.E16EIVED
I IPERMIT EXPIRES 4401
CITY OF EDMONDS
USE PERMIT
ZONE 4e
NUMBE�
CONSTRUCTION PERMIT APPLICATION
JOB sunE/APT#
ADDRESS
OWNER N,AME"E OF BUSINESS
PLAT NAME/SUBDIVISION NO.
)bT �0.
LID NO.
5i3O�0 DA-MOU, I -LC- PAVI C> Crl L I V. T-0
"LING ADDRESS
LID FEE $
PUBLIC RIGHT OF WAY PER OFFICIAL S ET MAP
EXISTING !AO PROPO
REQUIRED DEDICATION- FT
TESCP APProvecl
RW PenrA Required,
Street Use Permit R V
InSpectio Required
Sidewalk=
Undergmund
whing required
1:. jVooM 0- �JAY -0 0
CITY ZIP
gz-," L-1/dofe WA *3005
TELEPHONE
(*2:!�) 4& 0 3 - 63 &S a
NAME
WAd6ffm) A--zoc-/A7V-5
METER SIZE
LINE SIZE
1
NO. OF FIXTURES
PRV RE941REQ
YES ;( NO 13
ADDRESS
08 0 4, 7-x 19, Mar
REMARKS
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROWDRAINAGE
z
1gWfMhje7. eflisfta- fh-6,
I
CITY ZIP
ITELEPHONE
uw,~ VIAJ
01A- 4803,4-
NAME
.&W .
REVfEWED/DATE
aAORQ
ADDRESS
-_uyo Vyl�wp i
1C
FIRE.AEVIEWlio BY DATE
F6
CITY zlp�
TEIIEPHONE
;VARIANdE'OR Cq�
SHORELINE 010010
INSPECTION
RE
4ncO'D
ES [3 NO
BOND
POS TED
STATE LICENSE NUMBER EXPIRATION DATE
r
.,BE PA, REVIEW..�,
COMPLETE EXEMPT
EXP
SIGN, AREA
ALLOWED PROPOSED,
-AL�OWED PROPOSED
PROPERTY TAX ACCOUNT PARCELtNO.
NEW REdibENTIA'L.,:-.': �PLUWINd MECW;
0 COMPLIANCE OR
0 ADDITION PCOMMERCL&L .. , . �
CHAN 9E of USE.,.
LOTCOVERAGE-
A
ALL WED PROP09 ER_
REQUIRED SETBACKS (Fr.)
FRONT� ;'SlD E AEAR
PROPOSED SETBACKS (FT.)
FRONT- LJR SIDE REAR
0 16
z
z
REO'D PROVII
��LOT AREA.
IEVIEWEO BY
PL.AN.N1.N1(.1 R. DATE
A1021-
9
REMODEL a IGN
FENCE
rq
0 REPAIR X FT)
0 DEMOLISH EY TANK OTHER
o GARAGE RETAINING WALL RENEWAL
CARPORT ROCKERY
(TYPE OF USE BUSINESS OR ACTIVITY) EXPLAIN:
Laa" Z./
NUMBER OF RIT1111A
NUMBER o,) C
DWELLING AREAS
OF S. — -1 �_, - I NUMBER
STORIE 455A4 UNITS q
I
R
�VW tf Ar Of nM LA04MCAF.Ar n,.A04_
IAPP I
114t):� Qa4D
CHECKED BY
JTY7N
0
M
I cV7
15CUPANT
OR. UP
SPECIAL IN�1`5CTOR
REQUIRED YES
R
JAREA
OCCUPANT
LOAD
DESCRIBE WORK TO BE DONE
oF
REMARKS
PROGRESS'INSPECTION&PER UBC 110,11111FINAL INSPECTION REG-0
A-
y &A
W/TR PAR141,06- A fJD 2
56,1,6 lilt
am k I A.1/ 12-S11,0`7 11
&��
I I I
1 A-, ft—, kfyoe-) \A
-TbTm�- dfl-221 SF7:
VALUATION.$
646�La 28-71 1 1,;: 22J-7_ <Qv�r-.
Description
'FEE
.EE
Description
FEE
'Z Plan Check
CE I 1 1
HEAT SOUR GLAZING % LOT SLOPE % Building-,
�7
VESTED DATE
PLAN CHEr 'Plumbihg
cy Mechanical
THIS P; V THE WORK NOTED. THIS PERMIT COVERS WORK TO
I= RE DONE ON PRIVATE PROPERTY ONLY ANY CONSTRUCTION ON THE PUBLIC Grading 27 Recording Fee
X
3 DOMAIN (CURBS, SIDEWALKS, DRIVIEWAYS, MARQUEES, ETC.) WILL REQUIRE A
I= SEPAMTE PERMISSION. Engr. Review G50 City Surcharge
PERMIT APPLICATION: 11810111AYS ns, 0
PERMIT LIMM I YEAR -PROVIDED WORK IS STAMIED WITHINI_1180 DAYS—- Engr. Inspectio State Surcharge
SEE BACK OF PINK PERMIT FOR MORE INFORMATION LqD
'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS Traffic Mitigation Plan Chk.Deposit
IN INTEREST. AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND Fire Review tjW Receipt #
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE 0
DEEMED TO MODIFY, WAIVE OR REDUCE ANY REQUIREMENT OF ANY CITY ORDINANCE Fire Inspection Total Amount Due
0 NOR LIMIT IN ANY WAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION.* 15LO I
I Landscape Insp. Receipt #
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION: THAT THE INFORMATION .
GIVEN IS CGRRECT� AND THAT I A ' M THE OWNER, OR THE DULY AUTHORIZED AGENT OF APPLICATION APPROVAL
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- This application Is not a permit until signed by the
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED CALL Building Official or hioer Deputy: and Fees are paid, and
IN VIOLATION OF THE LABOR CODE OF T STATE OF WASHINGTON RELATING TO FOR INSPECTION receipt Is acknowledged In space provided.
WORK RANC
COMPENSATION INSU RCW 18.27.
,kqlfS
OFFI S E DATE
81 R (0 0 DATE SIGVED 1A135)
0! � J7,
7
771-0220 ED BY rATE
ATTENfffifi Off 1333
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL AAIZV,
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- 771-0221 69VAE jemal.)" 102::lfca
CATE OF OCCUPANCY HAS BEEN GRANTEP. UBC SECTION 109 ORIGINAL FILE YELLOW - INdpECU(R
10/01 FAX PINK - OWNER GOLD - ASSESSOR
PTRE
ETFILE
!s-rFZE�"O"r.
AA-wir-rc>"
L
N90000'00"E (BASIS OF BEARINGS) 659.42':
"N.52
94.34
PROJECT
BENCHMARK
PK
NAIL AND 3"WASHER
SET
IN TOP OF CURB
40
ELEVATI
ON 97.43
N90 0100"E
59.9
ST:
WATER METER
9
k"N'.
SIGN
TREE
4"�ECIDUOUS TREE
4P DECIDUOUS
FENCE CORNER
_97.60
--41
�*,',j'�v,'NORTH & 0-5- EAST
97.89
8.03
FENCE CORNER
'J,�R & CAP - LS 917r,
36'SOUTH OF CORNER
xg5.l6
OA'NORTH & 12 WEST
8.17
K
98
x
7,
WIRE FENCE
.3 WIRE FENCE
WOOD FENCE
CKE
RO RY
sET:6181 REBAR WITH
1.7
-97
3- ALUMINUM CAP
<
98.1
X97.3
98.2
x
WIRE FENCE
x
36"CONIFER ST
CONC.
STEPS xg �8.7 oi
98.4
98
99 -
9.72!
97
xg
9.7
8.6
WOOD
x
WIRE FENCE
DECK
END OF FENCE
iz WEST OF LINE
RNER
OF LINE
.5
X98.
-X98.9
0
499 -
FINISH FLOOR
1
4.03'
ELEVATI N
102.00
q
100.4x
X, W.
ZZ:
A�b
527
Q
x 100.9
LOT 16 &,il=e,eoi
SQ. FT.
-S
X101.0
X101.6
100.8
1160.70
0
0
f 2
',102
9.421
101.6
GARAGE:
>
01.37
INSIDE O.F
>,1.02.3
X101.62
/A
9.70r
101.7ox
24" DECIDUOUS TRE E
God,
02.94
102- -
RECEI VED
�r'.':i'4NCRETE
103.16
-GARAGE
LINE
M
x
02.7
6.8T
ON
FEB
iA
x
X102.8
y103.87 �'i()420
�-rt" REFENCE
02.76 X102.81
x
X
03.2.1 BUILDING DEPT.,
103
IDS
1,
END OF FENCE
x
E D OF FENCE
NCO
OZ WEST OF LINE
03.9
03.9
0 2! WEST OF LINE
104.
0 .8
GAS VALVE I
04.,U
1045
04.51
104.24
N891058'2
99W 49 4945
SET6/8"REBARWITH.
T' ALUMINUM CAP
& CAP LS 9175
07'NO OF CORNER
ui
EDGE OF ASPHALT ALLEY
-4.
FLOWLINE
.104.30 ----------------
..........
0
EXISTING SIDEWALK
10'SIDE SETBACK
LANDSCAPE LIGHT
IFSTREET SETBACK —
CONC. SIDEWALK —
98,
LANDSCAPING
BLOCKS
(DOES NOT
EXCEED 4'
ABOVE FIN.
GRADE)
99*
CONCRETE
RETAINING WALL
SEE STRUT. DWGS. —
---F=XI5TINLi--
6'H. CEDAR FENCE
AT PROP. LINE
v
DAYTON STREET
LANDING
+101.3
0
LANDSCAPE LIGHT
1
CONC. SIDEWALK
LANDSCAPE LIGHT
ml��
—LANDSC-APE-D-AR-EA----
(0 10,
w 4,
J,
u
CONCRETE DRIVEWAY
-0
(oil
10, �'3
LINE OF DEC
OVERHANG
IDD-T
ki L/— 4 - -�'; -i �� - 101.4'
UJI
a_
0
U)
UJI
L)
<
0
UJI
13L
0 Zong R- H I - 6 Corner y1agg
Setbacks Reguired Actual
Front ISO
Sides (4.90100
Rear IsIl
Other co,
POZAti.) Height 2-151
MAIN -14- lisp C�f fre"R. ta 5(d'e,
E
__IE�NTRY
6'H.
CEDARFENCE
cONDOMINIUMS (4s.ssl SOON)
0
PN. 5- 14— LINE OF DE OVERHANG
16 REAR SETBACK
L
ON. 5"
6' H. CEDAR
FENCE AROUND CONCRETE SI )EWALK
VAULTS
103'�
PARKING
(3) STA4.LS &'-b 1111) x 1&'- 6.0
Tp.
PROPERTY LINE
NORTH LINE OF ASPHALT—""'
SITE PLAN CONCRETE
Scale: 1 = 10'-0" D ALLEY
RECEIVED STREET FLE
MAY 2 5 291.05 APPROVED By PLANNING
PERMIT COUNTER
101SI
LANDSCAPED
AREA
LINE OJASPHALT
-,-,�:D
\ AREA
0
GENERAL NOTES:
LALL WORK SHALL BE IN ACCORDANCE WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION AND
sm 1149 sm 1149 SECO 249 70 27 M09 Ho 3 FE3� momo AMERICAN PUBLIC WORKS ASSOCIATION (WSDOT/APWA) STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND
MUNICIPAL CONSTRUCTION, 2002 EDITION, UNLESS 01HERMSE INDICATED OR SPECIFIED.
2. UNLESS OTHERWISE INDICATED OR SPECIFIED, ALL WORK -UNDER THIS CONTRACT SHALL BE MANAGED AND
ADMINISTERED BY THE CONTRACTOR. IN ADD11ION TO THE GENERAL WORK INDICATED IN THE CONTRACT
DOCUMENTS, THE CONTRACTOR SHALL BE RESPONSIELE FOR WORK SITE SAFETY AND COMPLIANCE WITH THE
F"MIKI, PH VAIL AND K %11-23'
n33 ZAV "0 �,41 WNTH 11W."O PER LATEST APPLICABLE CODES AND ORDINANCES.
l_________d - ------ SO
YTON STREET 3. PRIOR TO SUBMITT'ING THE BID, THE CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND BECOME
Lo fil'allze fr( n 11.2
T q�_ , , , 'T, Gf-
-7. FAMILIAR WITH ALL CONDITIONS INVOLVED IN CARRYING OUT THE WORK, MAKE ARRANGEMENTS WITH OWNER
SSMH INVERT FOR SITE VISIT DATE AND TIME IT WILL BE PRESUMB THAT THE CONTRACTOR HAS PRO DIED IN HIS/HER
k--F,W.q) vomwo-41 W cma SXosr.l.v.Wm.A& ox Wo Olu S� VI
N90% )'00'-E ELEV. 92.94 PROPOSAL FOR ANY MISCELLANEOUS ITEMS THAT MAY NOT'BE COVERED IN THE PLANS AND SPECIFICA S,
11ON
--------- 'N BUT ARE NECESSARY TO PROVIDE A COMPLETE AND WORKABLE PROJECT.
#vff 't u.
k_
N.
Tram cvms".q,.� r,�V. 19 4. PRIOR TO STARTING THE WORK, THE CONTRACTOR SHALL VERIFY THAT ALL APPLICABLE EASEMENTS HAVE
BEEN OBTAINED BY THE OWNER. PRIOR TO STARTING ANY WORK IN THE PUBLIC RIGHT-OF-WAY, THE
1461F: A flfl� !WVV�VIT Irc, LOCA411 FEWX
llvl� CONTRACTOR SHALL OBTAIN ALL APPLICABLE STREET USE/PUBLIC RIGHT-OF-WAY CONSTRUCTION PERMITS.
14�sr or 11111. MANKS1 SET 5/8- REBAR WITH 3-
Nlbfil, f2f I!IiS'PP9PfAVf Al.!.'#'� ALUMINUM CAP
pAyt4m "TWT fDx"',
5. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS PRIOR TO
PROCEEDING WITH ANY WORK OR FABRICATION OR ORDERING OF MATERIALS.
Dllll� ^f QJAX 12'
rf<'44 6. THE CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES REQUIRED TO PERFORM THE WORK, AND
SHALL BE RESPONSIBLE FOR THE JOINING OF HIS/HER TO THE WORK OF OTHER TRADES.
J,
s 7. NO PORTION OF THE WORK REQUIRING A SUBMITTAL APPROVAL SHALL BE COMMENCED UNTIL THE
0
- SUBMITTAL HAS BEEN APPROVED BY THE OWNER. ALL SUCH PORTIONS OF THE WORK SHALL BE IN
v
val
\01
'A A
- vo ACCORDANCE WITH APPROVED SUBMITTAL MATERIALS,
W 8. CONTRACTOR SHALL KEEP AREAS UNDER CONSTRUCTION CLEAR OF DIRT AND DEBRIS CAUSED BY
DEMOU11ON AND SHALL STORE CONSTRUCTION MATERIALS AND EQUIPMENT IN AREAS DESIGNATED BY THE
0
c:
11v
0 OWNER'S AUTHORIZED REPRESENTATIVE.
b..�.
I 01111��.
z 0.
")WO 10-r, MIS, 9. CONTRACTOR SHALL CHECK WITH OWNER'S AUTHORIZED REPRESENTATIVE FOR STAGING AREA AND
4J SECURITY REGULATIONS.
to
10., ALL � MATERIAL: STORED ON THE SITE SHALL BE PROTECTED FROM WEATHER TO PREVENT. DAMAGE AND
DETERIORAT10N UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE. CAUSE FOR REJECTION OF WORK.
I). V tyf.'ly QF tv�
1 03" $ j . . .................
W
m
SAI'41TARY M, 'lacu4,, IV 11 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL SHORING, BRACING, OR OTHER TEMPORARY
I ALLY.'!' TRUCTIURAL SUPPORTS AS MAY BE REQUIRED AND SHALL BEAR THE COSTS OF ANY ENGINEERING THAT MAY
A
I r.. (.'� BE REQUIRED.
S
M Nol. 1041111 1
12. THE LOCATION OF EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR
fol - 163 �,v, TE
77-75cr,,T7 OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMA, ONLY AND NOT
MAPLZ STREET (A110Y) NECESSARILY COMPLETE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE
...................... ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND`,T0 FURTHER DISCOVER ANY OTHER UTILITIES NOT SHOWN
HEREON WHICH MAY BE AFFECTED BY IMPLEMENTATION OF THIS PLAN. THE CONTRACTOR SHALL CONTACT
UNDERGROUND UTILITIES LOCATION SERVICE- (14:600-424-5555 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION,
SCHEMATIC PROJECT PLA AND SHALL FLAG OR MARK ALL EXISTING UTILITIES IN THE FIELD AND PROTECT THEM FROM DAMAGE.
SCALE: 1 "=30'
13. THE CONTRACTOR SHALL BEAR ALL EXPENSE*,OF REPAIR ' OR REPLACEMENT OF UTILITIES.OR OTHER
PROPERTY NOT DESIGNATED FOR REMOVAL WHICH IS DAMAGED BY OPERATIONS RELATED TO THE EXECUTION
OF THIS WORK.
14. ALL DISCREPANCIES FOUND AMONG DRAWINGS, SHALL BE REPORTED TO THE OWNER FOR CLARIFICATION.
ABBREVIATIONS: IN CASE OF CONFLICT, CONTRACTOR SHALL BASE HIS/HER BID PRICE ON MOST EXPENSIVE SYSTEM UNTIL
CLARIFIED IN WRITING.
AD AREA DRAIN RD ROOF DRAIN 15. REPRESENTATIVE FEATURES NOT NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF
APWA AMERICAN PUBLIC WORKS ASSOCIATION R/W RIGHT-OF-WAY DRAWN IN FULL. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE DRAWINGS, THEIR
CB CATCH BASIN S SOUIH CONSTRUCTION SHALL BE IF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED
C.O. CLEANOUT SO STORM DRAIN FOR.
DEV DEVELOPMENT STD STANDARD
DISP. DISPERSION TYP TYPICAL 16. ALL REQUIRED WORK SHALL BE FURNISHED, INSTALLED, COMPLETE AND IN OPERATING CONDITION, AND
DDCVA DOUBLE DETECTOR CHECK VALVE ASSEMBLY W WATER SHALL COMPLY WITH LATEST APPLICABLE CODES AND ORDINANCES.
E EAST WSDOT WASHINGTON STATE DEPARTMENT OF
EX EXISTING TRANSPORTATION 17. PROVIDE TEMPORARY SEDIMENTATION AND EROSION CONTROL AS NECESSARY TO PROTECT THE EXISTING
FD FOOTING DRAIN STORM DRAIN SYSTEM AND PREVENT SOILS AND SEDIMENT FROM LEAVING THE SITE. PROTECTION MEASURES
FDC FIRE DEPARTMENT CONNECTION MAY INCLUDE SILT FENCING, CATCH BASIN PROTECTICN, SEDIMENT TRAPS/PONDS AND OTIIERS AS REQUIRED.
FF FINISH FLOOR EROSION CONTROL MEASURES WHERE INDICATED HEREIN SHALL BE CONSIDERED A REPRESENTATIVE MINIMUM.
FH FIRE HYDRANT THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THESE BASIC EROSION CONTROL
GV GATE VALVE REQUIREMENTS.
HYD HYDRANT
IE INVERT ELEVATION
LF LINEAL FOOT
LS LANDSCAPE DESIGN
mi MECHANICAL JOINT
N NORTH
NTS NOT TO SCALE
LEGAL DESCRIPTION:'
LEGEND: LOTS 16 & 17 OF BLOCK 121 AS SHOWN ON THE PLAT OF THE CITY OF EDMONDS AS RECORDED IN VOLUME 2
OF PLATS, PAGE 39 IN SNOHOMISH COUNTY, WASHINGTON.
-RD ROOF DRAIN
ASPHALT PAVEMENT
-FD- FOOT DRAIN
ROME STORM DRAINAGE LINE (SD)
CONCRETE PAVEMENT CONTROL:
FIRE HYDRANT
.0 'o .0'. 0 0 VERTICAL DATUM
0 0 0 0 00
0 0 0 000000 1111110- THRUST BLOCK
0 0 0 0 000 EXPOSED AGGREGATE CONCRETE PAVEMENT
0�0�0�0,0 0 ELEVATIONS SHOWN ON THIS DRAWING WERE DERIVED FROM ELEVATION DATA
VALVE PROVIDED BY THE CITY OF EDMONDS.
SO FLOW LINE BEND FITTING AN AS -BUILT INVERT ELEVATION WAS ADOPTED FROM THE SANITARY SEWER
MANHOLE LOCATED IN AT THE INTERSECTION OF DAYTON STREET AND 6TH
CATCH BASIN TYPE 2 W1 GRATE INLET WATER METER AVENUE SOUTH.
CATCH BASIN TYPE 2 W/ SOLID LID DOUBLE DETECTOR CHEC . K INVERT ELEVATION = 92.94 PER CITY OF EDMONDS AS BUILT RECORDS.
VALVE ASSEMBLY
CATCH BASIN TYPE I VER77CAL BASIS OF BEARING
DA 77JU
CLEANOUT CITY OF EDMONDS CENTERLINE OF DAYTON STREET AS SHOWN 0 THE PLAT OF CITY OF EDMONDS
PATIO DRAIN AS RECORDED IN VOLUME 2 OF PLATS, PAGE 39 IN SNOHOMISH COUNTY,
WASHINGTON.
ACCEPTED RECORD BEARING BETWEEN FOUND MONUMENT IN CASE AND
INTERSECTION OF DAYTON.
70 1�,K- 10
11--Y MAP
viclim I
SCALE: N.T.S.
CIVIL S.)HEET LIST:
CO.1 CIVIL DATA AND GENERAL NOTES
CO.2 SITE PREPARATION AND EROSION CONTROL
C1.1 PAVING AND GRADING PLAN
C1.2 DRAINAGE AND UTILIITES
C2.1 DETAILS
C3.1 SITEWORK NOTES AND SPECIFICATIONS
IMPERVIOUS SURFACES:
EXISTING IMPERVIOUS SURFACE AREA 3,808.12 S.F.
EXISTING PERVIOUS SURFACE AREA 2.7g
7
PROPOSED IMPERVIOUS SURFACE AREA -.679.17 S.F.
PROPOSED PERVIOUS SURFACE AREA 1,932.98 S.F.
NET INCREASE IMPERVIOUS SURFACE AREA = 871.05 S.F.
A2 EARTHWORK QUANTITIES*:
CUT (AND WASTE OFFSITE) 1,200 C.Y.
FILL (IMPORT) 50 C.Y.
* QUANTITIES ARE FOR PERMIT REVIEW ONLY - NOT FOR BIDDING PURPOSES.
GRAPHIC SCALE
( IN FIRM )
I inch = 30 &
I
40q'('�
ddo
, I,, w ge0
CALLAEFORE YOU M
1-800-424-5555
FOR FIELD LOCATION OF UNDERGROUND UTILITIES
STREET FILE
APPROVED FOR
CONSTRUCTION
City Engineer Date
I MW
ME
z
W
cn >
= Lj
C)
CL
cn
W
m
z
LLJ Ld
C> 0
C-) L)
L') L)
E E
C.D
14,
IIN C14
�zl -(z LLJ
ul u�
C3
-,:� -c:� ,,,
r- to
two
to c c
0
c
C-4 04
cc
WE
M Epp
oil
"MEN
ME
'11
1
IM
in
.0
10
ME
AM
Now
Omni
ME
0
0 Mu
Now'
MEN
King
Is
own
OEM
on
now,",
W
W
P40
PT4
00 z 16
Sheet
AO V& Aft
AV -% ff 11
u a u
V
- NW
Sheet I of 1
EROSION AND SEDIMENT CONTROL NOTES:
a
U0 27 Ho� nD 0 3 E09 MOM
SM `�M 114� "ECo 24� 13
IF. 88.33
. ..... SO SID ---------- SID
. ........ .
____0(PROTECT
NEXT
W w---
CINCE CORNER
------- - --
C . ATCH BASIN)
rOUND RESAR & CAP - LS
917S 0.1- EASI kli 0_55'
OF COPHER
DRE flfDIRANT 13 t CA
120''At5Y Of TKNORTIlYkST
CQPNER OF THIS PROPERTY At�',W;
DAYTU4
STIlff'.1
FENCr CORNER
05 WEST Of L!NF
6
<A
4.
731
gp,7
I-OUNP PY NAti. At -if) WASKIR 0,27'
CA9 AIMID 117' I'MR41 (OFTSIET PER
C7,
4 ... ........
�n
?P-4YTON STREET
N90-woo,F (e,g9s OF REARINGS1 6!59_42'
7 SS .19 9- Ca TYPE I
p'.
<:J4 lt r-Pj�,,)j5FCf fP.N0HMAFX NA01. AND 3'
wAsim, srf IN rrp (yr fuRs
'00-E
4.
E'T 12" C.1 w __ --------------- ------ vq W
-,w 92.94
-- 36, CON�f ER
'I
w7
I , XD FENCE
It!
SET 5/8" REBAR WI
ALUMINUM CAP
—WIR.r F041'r
Aro
1 TYP
IT
I rco,
\261 713
0;;Il
0
0
Icn
7 0
V 06
WIPP, Fr cl
END OF FB E . C3, of �F_?,4s_x C',
0
o Y V�EST__Cl 0 0 AV-tu, gs-r OF ImE,
7 0" 0
GAS VA�VE
r(pjNO REBAR & CAP -
M CAP
B 9175 t?..39' FAST A 9. 5) �5-
MR. Q. ASPHAtl All
i`c*Qffl.; l0v CORNER
(10i, I, . . Z
00CH BA'�!N
RiM !02.02
/ [3 C-3 Povif.R PORIE 11-POWIM POLE
66
CATCH 6ASiN
102. P,7
RIM - It' 159
F�HJNI)l MONUMENT IN CAS� MAPLE STREET (ALLEY)
11
c
tj
.4. 0.'
V/
�_LEVATIbk- W2.00
LOT 16 N 1 6,601 S0� FT
I.L; , 14 �b
TYP Ul -�,' ", -4 I�L-
ry
N
2.: K,
0, 7.
- 0, A R A OF.
Z K !16% 0,2'
-24' DECINOUS
gy) Oil
n�
N
TEMPORARY EROSION' CONTROL PLAN
SCALE: 1"=20'
SILT FENCE
NTS
SUPPORT NET WIRE MESH
OR SUT FILM FABRIC _1
SEDIMENT CONTROL FABRIC MIRAFI
IOOX, OR EQUAL COMPLETE W/
POSTS, PRE SEWN POST POCKETS,
SUPPORT NETTING AND COUPLERS
WHERE NEEDED
BACKFILL 8"X12" TRENCH W/
31e MINUS DRAIN ROCK
Z O/P
GRAPHIC SCALE
( IN FEET )
I inch = 20 &
2X2* WOOD POST WITH
BEVELED TOPS, 5'-0" LONG,
AND MAXIMUM 6' SPACING
SUPPLEMENT FOR SHORTER
SPACING AS NECESSARY
SEDIMENT CONTROL FABRIC WIDTH 3'
SUPPORT NETTING WIDTH 2'-0"
so
DEMOLITION NOTES:
r,-,> REMOVE EXISTING BUILDING
R,-�> REMOVE EXISTING ASPHALT PAVEMENT
R�::> REMOVE EXISTING TREE
SAWCUT EXISTING ASPHALT PAVEMENT
SAWCUT EXISTING CONCRETE SIDEWALK (OR REMOVE TO NEAREST CONSTRUCTION JOINT)
REMOVE EXISTING FENCE
REMOVE EXISTING WATER METER (COORDINATE REQUIREMENTS WITH WATER DEPARTMENT)
CAP EXISTING SEWER SERVICE LINE AT THE PROPERTY LINE. CALL CITY ENGINEER AT
425-771-0220, EXT. 1326 FOR AN INSPECTION.
(NOTE: THE CALL -OUTS FOR DEMOLITION ITEMS ARE
SHOWN HERE FOR PERMIT REVIEW AND APPROVAL AND
NOT FOR BIDDING OR CONSTRUCTION. THE CONTRACTOR
SHALL INSPECT THE SITE PRIOR TO BIDDING AND
EVALUATE ALL ITEMS FOR REMOVAL AS REQUIRED TO
COMPLETE THE WORK, NETHER OR NOT THEY ARE
SHOWN HEREON.)
SHEET NOTES:
1. REPLACE DAMAGED CURB/GUTTER AND SIDEWALK, WHETHER
DAMAGED PRIOR TO OR DURING CONSTRUCTION, AT THE
DIRECTION OF THE CITY INSPECTOR (PROVIDE FOR THIS IN BASE
BID - PREBID STE INSPECTION REQUIRED).
CONSTRUCTION NOTES:
TEMPORARY SILT FENCE PER DETAIL 1/CO.2
TEMPORARY CONSTRUCTION ENTRANCE PER DETAIL 2/CO.2
TEMPORARY CATCH BASIN PROTECTION PER DETAIL 3/CO.2
PROTECT EXISTING TREE
CALL BEFORE YOU DIG
1-800-424-5555
FOR FIELD LOCATION OF UNDERGROUND UTILITIES
L
UK$ t4
THE ENTRANCE SHALL BE MAINTAINED IN A
CONDITION WHICH VAIL PREVENT TRACKING OR FLOW
OF MUD ONTO PUBLID RIGHTS -OF -WAY. THIS MAY
REQUIRE PERIODIC TOP DRESSING WITH 2-INCH
STONE, AS CONDITIONS DEMAND, AND REPAIR
AND/OR CLEANOUT OF ANY STRUCTURES USED TO
TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED,
WASHED OR TRACKED FROM VEHICLES ONTO
ROADWAYS OR INTO STORM DRAINS MUST BE
REMOVED IMMEDIATELY.
2 MIN.
4"x8m
R=25'
QUARRY T
TEMPORARY CONSTRUCTION ENTRANCE
1) APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN
APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES,
RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.)
2) THE IMPLEMENTATION OFF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT. AND
UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR UNTIL ALL
CONSTRUCTION IS APPROVED.
3) THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY A
CONTINUOUS LENGTH OF SURVEY TAPE (OR FENCING, IF REQUIRED) PRIOR TO CONSTRUCTION. DURING THE
CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CIFARING LIMITS SHALL BE PERMITTED. THE CLEARING
LIMITS SHALL BE MAINTAINED BY THE APPLICANTASC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4) THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL
CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS,
DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED.
5) THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE
CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR
UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL
SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.).
6) THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANTASC SUPERVISOR AND MAINTAINED TO
ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE
ESC FACILITIES DURING THE WET SEASON (OCT. 1 TO APRIL 30) AND OF MONTHLY REVIEWS DURING THE DRY
SEASON (MAY 1 TO SEPT. 30).
7) ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR
TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED ESC METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
8) ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
FIFTEEN (15) DAYS.
9) THE ESC FACILITIES�ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A
MONTH OR WITHIN 48 HOURS FOLLOWING A STORM EVENT.
10) AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A
CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
11) STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS
WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF
THE PROJECT.
12) ANY PERMANENT RETENTION/DIETENTION FACILITY USED AS A TEMPORARY SETTUNG BASIN SHALL BE
MODIFIED NTH THE NECESSARY EROSION CONTROL MEASURES AND SHAH PROVIDE ADEQUATE STORAGE
CAPACITY. IF THE FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY
FACILITY MUST BE GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
13) WERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A
MINIMUM THICKNESS OF 2 TO 3 INCHES.
14) PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO
IDENTIFY MICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE
SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE
SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY INSPECTOR. THE CITY
INSPECTOR CAN REQUIRE SEEDING OF ADDITIONAL AREAS IN ORDER TO PROTECT SURFACE WATERS, ADJACENT
PROPERTIES, OR DRAINAGE FACILITIES.
15) DEWATERING CONSTRUCTION SITES. DEWATERING SYSTEMS SHALL DISCHARGE INTO A SEDIMENT TRAP OR
SEDIMENT POND.
16) CONTROL OF POLLUTANTS OTHER THAN SEDIMENT ON CONSTRUCTION SITES. ALL POLLUTANTS OTHER
THAN SEDIMENT THAT OCCUR ON SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A
MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORM WATER.
'----,17) FINANCIAL LIABILITY. PERFORMANCE BONDING, OR OTHER APPROPRIATE FINANCIAL INSTRUMENTS, SHALL BE
REwt FOR ALL PROJECTS TO ENSURE COMPLIANCE NTH APPROVED EROSION AND SEDIMENT CONTROL
PLAN
CONSTRUUTION SEQUERCE:
RECOMMENDED CONSTRUCTION SEQUENCE
PRIOR TO ALL WORK, CALL CITY ENGINNERING INSPECTION LINE AT 425-771-0220, EXT. 1326 24 HOURS IN
ADVANCE TO SETUP INSPECTION.
1) PRE -CONSTRUCTION MEETING.
2) FLAG OR FENCE CLEARING LIMITS.
3) POST SIGN WITH NAME AND PHONE NUMBER OF ESC SUPERVISOR.
4) INSTALL CATCH BASIN PROTECTION IF REQUIRED.
5) GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
6) INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.).
7) CONSTRUCT SEDIMENT PONDS AND TRAPS.
8) GRADE AND STABILIZE CONSTRUCTION ROADS.
9) CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY
WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
10) MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF EDMONDS STANDARDS AND
MANUFACTURIER'S RECOMMENDATIONS.
11) RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO
THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH
THE KING COUNTY EROSION AND SEDIMENT CONTROL STANDARDS.
12) COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR
TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING OR
EQUIVALENT.
13) STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
14) SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
15) UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABIUZED AND BMPS REMOVED IF
APPROPRIATE.
^0 A Tr
NOTE:- INSERT SHALL BE OFOSS STREAM
GUARD OIL AND GREASE INSERr OR
APPROVED EQUAL
OIL SORBENT FILTER PACK
GEOTEXTILE FABRIC
SEDIMENT STORAGE
FILTER FABRIC PROTEC-flON
TEMP. CB/INLET PROTECTION
Z
0
LJ
ce.
w
w
u
z
C-)
=
1.1
CD
cc
w
CD
<
C-4
04
La
00
r-
<111
LO=
C141
c
p
kiW 2
son
so
NER
1101
MEN,
no
mmm_
on,
so
IM-11
is
Ilman
0
IS
Run
MOM
Inn
0
m
0 0
INS
son
BMW
INSURES
_111"
"
111
immommimm,
NMI,
w
w
P40
0 z
W
N.T.S. SEPT. 20, 2002
Job Numb*r
237—WAN
APPROVED FOR Sheet
CONSTRUCTION
c,
U1,11H)ING, LLPI City Engineer 0 4Dt �e Sheet of
CONSTRUCTION NOTES:
� /M F* I
.... . . . .....
91.66),
8,, 8 � 2`111"
c-D CD
A
6e-
j
J . ..... ------- sf
D st) 0 . .......
SD
. . . . . . . . . .
A YTO-7V. STH-Elp T
!,,,19 0.�( C B
j C"k, 1 0 r2,
JO EA f
(7,
I M
--P
-'�'&T BEMCHMARK PK NAIL. AND
FOW-4) !vl()l! lF, �t
SE" I N T OF 0 R B
N 9 0 ),,f`JV0 0 E 5 9.'\9 4 f-LEVATION 0,T4,3
F-' I \6t±
FE1,4CE. C i-<NLN--*\ z 1.
U -.1-cT.1-1 i I � "V
... ... . .......
V
W 71-T, W
)Z�
3 7.50
& C'AP I-S
FOUND RE 2
�66
1 -7 r. 74'9 5 " -�'
R 0,41 INCRT"
9 J 0, 1 '5 IF -A S T 0.3 F'ENC.E R N E
X
SOUT11-11 OF' MIRNEF -� : , " . . . . �, ... I
WE ST
0 -0 0
U!!-O u 0 u L) u
-77,17K M-77 00" ;06c)o 0 A 0 Q ou (,0u.0 0 17
U0,00uo 0 )a a 0
-.:5 000000
OU000 �0
O�
0 U0 000 00" '00 0 0, 1)
0 00000.9
b ?-b- 2E2� �-Q-&a6D�
�F-000-,P24,-O�l
00,
00
00
0
00" 3 0 --W("0D FENICE
`---WlRl-` F'E N E 000.(( 0
9
-4-
NOTE A FIRl-'.* I S 0 C A T E 9' '6' 4 U '4.,-000 .'0'00'00'0'00' 60
0�', - WE - A
.00 0 0000gogog
k, 0 000 'OW 9
120' VVEST OF '[1-1 NORTHWEST 0.. "u 0 [) o' 0,0 000 Oq 0 REBAR WITH
.-A 01 o -- o ;�,Oo o0o �to 0
0 P 0'r 051).;0 -bd'
0 o o o 7� Oo o ck`p: 4. o i
p R 0 11 E RTY A 0 N G
1 0 0,00ou 0 Al-UMINUld AP
0u00u00u000 -0c '�)0'00
0
'jo
1 '000,00,-0,0.,-0-00- 6
u
0 OU
l0j 0 0
0AYTU'l 0 D A L) 11RE I EN"
0* oug,
1/ 0 0.0. 0
0,0JOU0 .0,c� '0
u uou X
0,
an p 19.- if I a ca
LL
z
0 0
-1. 0 0
e., 7, r -1
60
'77 x
77
9. 2
T
-49 7
X
OF FENCE 1 2'
7
VVE"")'T OF' LINE
F'E; C E 0. 1" R
r
0, 5' WES, OF' UNE
c
4
4, 0 -1
T)OR
HA14DRAILS PER -A
ALONG ALL RAM �0(
2 'A O�' C) c)
o
EXCEEDING 5%
c
TOW
11
0
1 ST FLOOR 104.50
BASEMENT.= 94.60
8.,AL_ 8.5
rl
0
j
J--
M W
'T Ln
60 6; f5,A) 1
r c6
W AR
1, 101. 6
Im .58'
0
0
0
0
Tow 101.80 2 0
9.10
V)
9
x 0 c v
z -/.,Zz 7 02,.7
0
-I' . I Q1106 AI
I W. - -
1 3" "Alul FJLLF-,V
0 FIELD CHECK WHEEL ST F1 c6
85.00
LOCATIONS (SEE SHEET
0-)
z E
v
NOTE,' A' UA pl-p*mn, C
9. 7 0'
w
E�E .Lg.!AN OlW R-
A CH.
3
TOP OF SLAB " I
VA,66W
D
END 0FGRl-l.-Fjcr--
0 '/2 '-vVE S 1- 0 F L 1 N E
GAS VAL.VE-------/'
I U.")W) Rd-AAR ('-',AP -
t-S Q 17�5 0, 3,9' E. AST &
0 P N E R
0A, NORfll OF
0 11
ASPHALT PAVEMENT PER CITY OF EDMONDS REQUIREMENTS AND DETAIL 7/C2.1
CONCRETE SIDEWALK PER CITY OF EDMONDS REQUIREMENTS AND DETAIL 8/C2.1
CONCRETE DRIVEWAY APPROACH PER CITY OF EDMONDS REQUIREMENTS AND DETAIL 6/C2.1
MATCH EXISTING GRADE
ALL CONSTRUCTION IN THE PUBLIC RIGHT-OF-WAY, INCLUDING BUT NOT LIMITED TO: SAWCUTTING, PAVEMENT REMOVAL, TRENCHING, BEDDING,
PIPE, BACKFILL, PAVEMENT RESTORATION AND TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH CITY OF EDMONDS STANDARDS. ALL TRENCH
BACKFILL IN PUBLIC RIGHT-OF-WAY SHALL BE CONTROLLED DENSITY FILL (CDF) - 2 SACK MIX PER CITY STD. DETAIL
G) CONCRETE RETAINING WALL (TOE WALL) PER DETAIL ll/C2.1
CONCRETE RETAINING WALL (HEEL WALL) PER STRUCTURAL (>= 4' HIGH)
EXPOSED AGGREGATE CONCRETE PAVEMENT PER DETAIL 12/C2.1 A
PRECAST CONCRETE WHEEL STOP PER DETAIL 14/C2.1
2" ASPHALT CLASS "B" OVERLAY
ROCKERY WALL PER DETAIL 13/C2.1
BOLLARD PROTECTION PER DETAIL 15/C2.1
SHEETNOTES:
FOR A LARGE SIZE SEDAN/WAGON, AND A REGULAR SIZE VAN.
.................................
R W
-lST . . . . . . . . . . . . . . . . . . . . . . . . . . . .
FLOOR
FF 7' MIN. COORD.
104.50 W/ ARCH.
EXISTING
GRADE
100;1 .. . . . . . . . . . . . . . . . . . . . . . . . . . .
8SMNT---
FF .7.4%
C Ell- DRAN
HANN
. . . . . . . . . . . . . . 'PER DE.T., 9/C�.l . . . . . . .
DATUM ELEV
85.00
ATO MUS, "- 0i I I
SCALE: 1"=10'
............ ...................................................... . . . . ... . . . . . . ... . . . . . . ... . . . . . . ... . . . . . . ... . . . . . . ... . .
15'
. . . . . . . ... . . . . . . ... . . . . . .. . . . . . . ... . . . . . . ... . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . ... . . . . . . . . . . . . . .
SAWCUTA
IST FLOOR FF 104.50
,--EXISTING GRADE
100: . . . . . ... . . . . . . ... . . . . . . . . ... . . . . . . . . . . . . . .
. . . . . . . . . . .
OVE�LAY- 'NEW:PAVEWMT'
J
BSMNT FF 94.60
. . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . .
FOUND Rl CIA'S'E'
SCALE: 1"=10'
RA",�
A
RIM 10 9
I*
p r Vii E R
A i44-lt 1 1 NM -%A I I
G
DUMPSTER ENCLOSURE
xAl"
01
0
IF' F N l(.1 f
s
WEST OF UNE
-3
04 51
5/8" REBAR WITHI "'.1"
T
XLLGY FULL W! H
T 3 .......
REA
(OVOLkYA
EN' --'4,5 0 FOR REMOVAL)
5 SH WN
H � F
MEJ 9'5 6 � 5 3 " W
MA-l`--llL.E STR-EZT
N
6 5 (D,',
(ALLvE-J7 Y)
GRAPHIC SCALE
( IN FEET )
I Inch = 10 ft.
C)
00
CD
C)
cn
4
-i
C-4
C4
6
cn
CD
0
CD
CD
C6
ui
C"
cn
111%"Ill
A I & I
SITE SECTION N-S
SCALE: 1"=10' B
1+00
r
1 ST FLOOR FF 104.50'
. . . ... . . . . . . . . . . .
100'
BSMNT FF 94.60
XISTING GRADE
;E
. . . . . ... . . . . . . ... . . ... . . ... . . . . . . ... . . . . . . ... . . . . . . ... . . . .
DATUM ELEV
85.00
n
C"
a)
q
Oq
C14
CD
C)
CD
0+00
SITE SECTION E-W
SCALE: 1"=10'
0+50
H!X) 1[ IK;:,� b
APPROVEDFOR
CONSTRUCTION
�)J� City Engineer Date
z
0
cn
W
CL
Ix
cn
� C n-
CP
P
W
W
W
1.1
cn
cn
W
W
0
0
W
0
z
N
c*4
C)
ul
11
jtlol�
1�401-4
<
m
W
r�%
CD
'0
mcm MR 123111011F.
2
0
'LLs-el
on
01
mom"
son
0
511111",
mom"
umm
son
mmm
mom
Imummont",
on
W
W
0 z
W
00
SEPT. 20, 2002
ISheet of I_
0
CONSTRUCTION NOTES.
0
0
to
0
iL
m
-
. _.. 7 � ' ; .' ' �', _, " - I :
�
; '..",
- I I
, . - - .
,.--.-..,.---.�--l.��---...-..I-i.�..,..
r-1 , 1: ,:; ;, , .:, 'I, 1 ,
." � , ,; --f I I
: % _. 1, I... , , -,
I . ! - i
/ . .,- I - , " , � -1 " I
:; "ll - -, . : -_ ,-. . , -,, ,
.. . , , t -
/
/
I
;
z
._l_L_
.:,a � -
., I -. r- r)
.�, !,.,.,--. _,._.....l__.l_._ 'I
",_
I I.,
I - -
__
"
1-1--1--l- ,,,
11
CI3 TYPE 2-48- W/ SOLID LID .
BUILD OVER EXISTING LINE) TERMAIN DEPTH
"., RIM 95.00 (MATCH EXIST.) A 11 PRIOR TO CONSTRUCTION OF PROPOSED
IE 90.86 (CALC'd EXIST.) ,,',�
CD (�) - ;�� SANITARY SEWER AND STORM DRAIN
1"111.1 r"s
9 � _N`-,�_,,--,', - '�� _`,,"�- IE (8 , S) 91.05 (MATCH EXIST. SPRING LINES) 2 FOR CONFLICT.
",-,I hs;E� -i-:0,, �`,,-�-
� � ,,,,,,,,�,�,',bffi ,-
����,,��'I'l",",",",,,��-'a�"I'MM ,-,,�"",k�
�__', I -5,""'M .,��
." - "��z "I", 1��-
;,.�i.���.,,,�,���,i�L",����l.,,��
�, ,
., , ,�
, -, ,
�`?,�g,�,",
:,_,,,,- � , - .,
" ��,,,,a,�, .,l I �- _ __ ik ." .:.,.
�_
_�
c, � "n, - ��,,,_,'
I ? _,_,,`,_ ,�,,,,` - , f
, -
, �,,�,-',�,� ,�, f � ... I`_ 1�1
. t " - " , , 7 -_.._l_,._ 4 ,_`__,___,_, ,,,
` , ` i 1.� 1 `_�
I 11
" 11-g ,
-, It ,
I— � & ,��,,,� ,"'. ___ "-,- ,
�
�� , j 1, i ----.
"�,� 1 , � * `,,� -_j U I
, "
-, - � ED 1-1----�1--�-�-------�1--l-..--.--,�---�-,�., ___
_,,� , C,
_
,_._
.I , - A., .,.,,.,,.,,.,,.,,.,,�.�.�.�..��.�., -
1____..ll SD ____-.___________.___ 1, ,_,,'�i, " ---
I .,
� _,,�_
,
,
- 11,1'51, , " " D __._l_______.l_________ ------- c - Q -__
A,, -
I U
,
,,,`�, �3, ," D .-------------__
-g� g�,..' ,.,I I �
- A� _�,
'R, F _2 �,;,',',-R, j _?
,,",�, , ,
,-,.,fg,��'!,�,, �- -,-
I �l
1`�tl"� I �_,�� FIRE SERVICE CONN.
,� - �
" 55 §
�'
i
_11.§ I 111 - --IT
� :A ONT STHVE71 IL It 1 - 12"xl 2"x4" TEE (MJxFL) -
-!�,", I cRO x - � 15" .
., ,". I-- . ,x8"x6,"l_jEE.�SET,w,45- ROP d
.1. I U � , (FLxMJ) A
A-j �" BOT. SD 91.0 T 0 "I"lil-) " "'Ll , I i- A � k pnkmt ; mrv\tcu � t06"n ll'�', F�-_)(,,, At ,
I
� I i Ili'— 11'
,'I . 1�1-;L ,kt% I 41 I v � � I I
"_
e�l �? , A r.f� (_o Lo � � � , -, i I ��� 1-1, I 2 - 12- DI SPOOL TO FIT AND COUPLER
. . - " v -1
�
� . , CROWN EX. 10" '' ���'��, . - I l; I'
.
, ( I 11) - , n CX .3 _�.� �, � - /----..-.. - � - -
- _11- -1, __ =._�, -SK-- Tl��,� � .
� I -, -
, - - , �, I ,, , � I'-,- z-' , _---(SEE- , '-w- ,
1, 51 - I— _.___.____._ -1-1- __`,_,__,__ -,----..-.--,-----. I Al C-1,3 x-., -,-.-
- � � - I - I _��
- , I -,,,, -.__._.____ -_::777,�%, "�',�l-.-.,",-..��..-.--.---�.�--.-.q",� I . 11; S� . , "11'1�) _______._________ ,
I I— - 11 , IS � --j" ,
___...��L..____l ............ _ , , _.___ -1 , _____________.,__.._ _L _��__ - _._._;*
, 11 '11, �I'�j _,A"_;L� ,_ I 1311 F-1 ,_ 2 - 71'. , - .j 131 , ; - Q ,
43 -1 , � I ��,� ,
:1 � � I \ 3 �
_ � � � . � , I— ,.j
� . �, -
PIPE CROS§iN'd " A \ a �� ;,,, A � 1-1
. �,
- i , 1 9
1.1(11 _..., .- -1., , , A .1, �1_ - _"" _... A . 11
d r�j! . , f, I I
I -1 " I. � , `� N i � 1 t, A � " � j N, A (�:, ,� Im, -1 -, �� - , I .. 1
! I f I , I I .- ,-, : �. 11 .
.- � i 1 -1 m 'd PIPE CROSSING ' / - - r�_));� I r " T", ( � � :1 rl it
.� I I . - I - .
i 'J ".1" I � � I 'Y " -'I V !L_ I ,,,, � A � �/i, q, - I � � I f 1� I i DU110,111 illv?JARr\ P, UUM.L ll_V�111J I)
__ ,�l NOTE 6 -,�,- �" -,,� J" 1 �
" CROWN EX. 15" W 90.6* T 1, �, I 1 '6* 1 ... - �.,D 01- CIM
, ' I BOT. EX, 8" W 9d. �� I
� , I � W", ,
00 : , / ,��;� A ; j I p Q.-1 � RB
- ;q, � , 1. � , ,-. : I L i ", �l -
11 � 9 , " , �, �*., HA IN 1' -
I - � �p - - I
(*SEE SHT. NOTE 1) ', I , r- , �, \ CROWN 6 S� .9 I— � r" \ . ..... --I
I � ' � I I
,,� , � - � A i �,,, ,j
I, ,
N 9 ' , 11 00 [�_ ,� . -.9 4' I'LL V W T4 -� Q 7. 4"
4 � .- � z F .
I
I
r- .-
I
Ix , , (*SEE SHT. _90T i)
I c " � , / _____�
lLn � � �� 1 i t
`
.
�l �� � % 1. i
I I " C'� I f
I I
� 11 10 �l ,,- �, i t - � .1 ki `.. It. 10 � A2 -
� ,� , ,. I -
,f 0-, , I.. I_? _' :� ,_ c �, " I . I
.,.I �._, I I 11 I -- f-) " q- -- - ,D) � '' .- I , � 1 A ,_� ,r,, 1
, - , � ___ I _. 1� r, "ll ,
J J ( I .... I- 1f e l_ �., 11,11 i ;, . �
� _,?,� ! ! � ,
, l.:,i_..H.,_N`UL, %,A.wll��u_%\ � q � 1 �Z t� 11 � ,
c �: � -� I L., 11 � I
, ,
,
I e- I I c:__" 1, I i - � I �jf v - �� ,I " "'._.- .
- , \ r , I I ��________ 1" I K____.. .---I--.------ VV ....___ �, _ . --- ,-.---,---�--�l.-f..--,-.----,-�--,--,-,-�..--.,. __.____l_________ , -------
m , "; p I : I I ci-�V -' �_ I A , ,
I X ,. "',
i , ___ _Y A' w I—- �11'\ ______-_______,lK
I , I_ u�l .4- ____-I
Nt � t, ,. , -----\ � J, i--�- 1 11,
I � � J_A��T - 11 "" ') �� � 1- j- -
i I , 1, -.1 ,j i_.`'." F ' ,I D E (., � , 1, �9,R P' -- . ,
�j, _. _.__ , Al ____ --,-"-- 1 _,___^____,__,`___ -j� I , I 1
w -.----.- .. __ ____l-___l.____.___ -____�T__,_, r_._ �` - � ��_` " " , L-r-f- N ----.,--
Al�t, 11 I i-I I � r. I , � 'I---
41 0 N" �* 1 .. -1 � i � r , .Ili "', ..,
5 LF 6- SD . 'r�l -� I . i
I I .1 � t \ ,I I
,�� � �� "
, i ! �� SD "TEE" LL 1� � \ � '?0':5rYZ5 12- IN -LINE VALVE BY _�
I 11 1. � 't� - 7 ' ..... .. _',
-20ft/ft!, "t'! � I 1, \ id
, _� I I - 1. � � 11.1 "I .- " I � _�' .(olw _1�
0 OA I 1. 19Q 11 \ .. `:�r 6 � 0171 E, I
1, ,,,, _7_l_.l�r___.,_ . _f �,,"N__ I � ' /_IEA jk� "'7.j,_,,,5___=�;4 I'X INSERTAVALVE APPROXIMATELY
= =__ . - ��.-_ . 'I . . -1 '_. � _.�,l ,__q_.....,,_ ____._____
I � - � �� I . . . . __
. . .
. I - .. -,
�. ,.� . x_,_.,v I '�. z� �.. . .. -:- . -.' .: ". -1. .
C (-, � �,�t,� F"E ,),.'�__j__��,,`k E) 1','?�- �- 2, 11 - - 31.11., m-,.-t � ;�
I , C A C;� ,-.- I ' � T____m ;,!-" .- .
I � ., : _.. _111 � _ I , _-t.:'.-,* - .-.- A . i . . , ,
. _'_ ___ " , . . - ,
. t" 1. . i ��-,-.' : I . _ ... . s, 05rW-iQ::�A 50' EAST OF FIRE TAP A
- � � ::�;>`__ _____, ._..� _... .. . T
1 , -, , '!� .... - _.
� `�, ; - 1. .%.
,
I -Ut'l-, i�L,A,�,Wll ;,, �41_k�; I--,. I� Z�f�L,J CX " .... '..� .. !, -� ,
11 , .1 ;l ��. - � , ... . ., A, . . ".. . ...I , ;1,1 -4o,
,
,L -1 .0. .;% , . . . t"_... �.. __ . . . . .,,
�� �,q w I _Jl .. . .. A - t - " A— : ��- .- . wx ,
-, -r- � \ - � " ,.!, , . , " __ . . ., �
' i. I
I -, tc -- ') ,6 c� � 1 -, �- . - . �. -
'y' , ,,,-� ,n� -4CB, TYPE 1 - 1� ... - I ., - . " - r- ` "
I i � %?, I " ';&... � ....:... . - - e'�: - �--- - ", I— . , / � ��i t- fe . ,
.., . � 0. .1. _� . .. . -1, - - . - -1 . �
- . . .� " �- I ,, �.: "'. . , , - - . , - ��. . . �.. -
IV _� - -..-- ., , , .,----. - � . .. , w.11r! , �', .q.A.] "" . . .t. ", .. , .. . � .:-. 11 " � -I ". * 1 �, I ,,� Uf " 1 i i
. . : q .- . - - . - "/ �� 'sq
" lfg,�lll , .. 1� - -, .- . , ul.�: 1. i� .: _". . - 4.-
i " ._,I " , Er",-:1 � .- __ - -,-,r.,-.",---,".�,,�",-Z,-,-3,��--,, " D� , T �, �.., !-I -
: � 11 I
- ,& . � nt &
9'� '`,��l 110.1 , - ___.. -
, , 3 -RIM 95.50 , �-,!--�-." -:1, ..., :*. , I - - N � ".�
- - --- -� � -- , i.. .. �s,�'- i�_ , �,:,14;,. *%.. 1. � , -, � .i �l ,111 . I -1, ,
0 ", . " . , -� , -` : - -ii -, . . - I I S - , - � �_ w
.,oi 11 I (I 11 �). . 11, � - %.A ... ... - /
I I; I , K __- 0 RN ER' -.iE_q2-,00_(j5", S) Nllf..' - , §,� J-1 .1 _w�.`- ,-. .'..--. �,-,. -�, , .., .. ," , .. e I - 7� -
, .. : 4 . -!,'-.-,, .
, -, -. "t I 4.0 . _1 .� - -�-,_ " z.-, * *-. . ,� _1__- I � 11 -
- _I , ",.;,,�. - I- _-�, � I � . - - m_ . .. - , - , __
- r * -, . i - ... � 1. - �1! , " _ . ;,:.... - - ,� d,11'.- -, , Q Ik, . 1� V" -) 1
, - - 7 ,,,- - A I:- " .� �, ...7 . . ;I. ---I.. .. -
t��,ql', : ..,wt . . , .1 � .: .1 . - , 4 ,.___lql._ z 1
, . . �', . � I �11, ,);-� - __�z ,- �. 11 _. 1. ., . -, I'lo, � " I 'X. _
__ - , , - . - � - - 7- 11 �2� ,� I
IE 91.! � " 1 I-— _ _��
t�_lt.'_-_t.� ____, - , -0 0-600 .11 . 1. . .1� I .1 - _i ;.-- _V� �-TA- Ll- PG p- Ma- N,U cj-(� , �%
,.yN_ , ,,, - "I ......... �� o 0 ) , , _ � T_ - - . - _4LL,_ - -
11 " - if, . 1- () 0 n n 0 C. P i
I I �.:�'-.* - 0 0, 9 0
- - i,,-,,),\,-,,,4,",�71-,,'-�7�-q 57--Y,�6,�".,'-. I,- , _i sr- 77-1110 6i ,, I
.. 'l, 1�_ -!,., � -iiE i-TXV q 'o :.' -(,i � I" ;-� P, A-.(& " (3 A-T--1 0 /-4,S,
-
� ......... ��,l - . , . .. -FLOW,1CONTROL Q 0 '00" U. , . I 'n I '� _��
, - , I
�,. 11, �.. '% C :- I , -
�
Nirl�'...,li I I �__" /-tW il,._-�I L U�_, I- - J_ --- . w - , u u I 411 'v -----',!44,!`('X0[_'� rr 1E N tr'F
.- i F". E [1--ll,,(T'k,-`N_' S ' �' " A I Ic LJ,A, �_) i 0 '060 ; " [
, o,c),o`6 0 0
1,i Ul i I. - A F1 , '95.9 00.) 0 , 4 �. - / I
- � , , _,A'�, - " Q ol 0 0 0 0 0
1 i . RIM'95.9 0: 000 _f L,
� .: .. -.0 .0 0 . 0 C) - - ". I �� ,It
11 - - 00 - 0.00.0. 'w T_ - -11 R .. I
� � ,� i 'I, 5�7 c o 0 ... I "I'll, !
11, _t Ll , Ij �_., I � t ; ,I 4 � k-. � I 'I- N ..'.' . 0 .. '11)4 k, - i - 1 11
- r, W-1 c�,, - ,". F -11.1. . r. M('11" , I ? I � l_ IE 91.30 '30" W 0 uouoonono i � )_,___t'mf-r C�, lc�' L �. , It 1� j
� " , - 1 1 ( 1_1 -cl , , I I "I'll"
-� -, i�t - ,)� b cl000 0 0 �e
v/ - I-q.," � � " .- 9�'pg. � i
- 1, :1 - "I'll I'll, ��� "I 0 _ff- P'. - 4 1 ") I b I
I - c o 6 w �, I . x, f r
k .1 . . � I IE-91.30j 0 �18 - .0 _- � .
11, , . �0"ctao ,
.1-1 ,", ". � V_ �._ -_ . I. '.,� - 8 ;IN) 0 Dbo , � . . APPROV_'D AS NOTED
I , I D �' �- -Fl_ "; e " �,j r", (."F) ?. PI/I �. , m� I" PIV I - if- -1
1 1- j � -, I- . a - .; it , -1 , ; I 1v il
o I - o- 4 1 �
I , i , - - iq- ,I I f . '! , 2 0 . - - - � 1 -12 N i f �1'11A'
. I I fl- I �, ,_.'� � t" I" "INV 3 . , M/--,I o - -.- - 0 _L(,H� "HN, t-W ��"
k_� -,, !N� - N." � k- I � I.1"C' � 0 A
vA ! � - , Ali_J . ... . � A
� I-. f .) c /I . ___ I u-�11_11 11 11 I - � �� - I I 11 I I BY EN'GINE RING I
" &O 1 6 � �
I ;o 9! o� ,, - C . - �__F% 1�'_'f_
I . Q - F 11-1 ,
r .. �' �_ C) , _ t _�I_ ,I-r
-� "'ll- - .. , . ) 11 � I-VL,9-
" A ` ...... 0 N ��'�`_"` Eli` T - D ,, 2 b
u y ! ,,, I I " LL I I f -4.__.-_; 1`�ll I 11- I I ,G(-I
I - ... 1:1 " - / 000 I!
ml-m � I ,� T
. " z 11, - A�, Iffig, L
1� , r -
" -
,
I A 1_1�`._',ll . � r - ll�l %�N ,�� , -,;_, nntnb 2 lo,
I
,
, �7,)�,
t,.,
F4 11 .-
"
-, .
�f
�� C , "lj`�
c"I
(�_� 11
3
. I
�_l
�_
,
t.A I
.11
�� ";:11-
r-,
,.--.
,
<
.
1� C'_1
,,--,
�
,_r
:��,
.1
P9
�j
I r)
-A j
i -
I ..
- . n *� L_ 4 r - "' ' ' ' ___4:�741_ 11 ____/`llllll�_j__
. � _"." -,� �l , , , " - .
. . � , , , "" , I 1\ W 4 i 11 d - ,-?- / I .,;,'� I , 1, I V' , It � I i I .. 1,
, , - � � , , rl r , -,
- . ,;,'� ,/ ,�,,' , I
,_�� � . � - . . - , . �, , 1. �
I .. , . K -, _z ,�� s - I,) t , , , .
. - �, 1.
. , ,e 1. I __
. : : . . , � _/ -1 i
,
,
. . � , . 'A ! , ,
,,, - , ;! X". - " _', , -, i-cu TYPE
: - " ... N,X -, �� " W/
,�
, , ,,�
z ,� ,,- 2-48
"
�l , . , -�_ ", ,,, I,',- , i ,�, "., ,�� __ � / / i ,I-
. ..:,�- ". r, ,z�_5�1.',' .." "_;�t- �
. . . . - �l 1" I/---,- 11, '
� I . 11 , e.3.11 - . � - - / , Lf -1-1, -'SOLID LID
_. ,J� I � :11, . - � q , .�,--���
_�,L'-? " � % . ..-. . , . . � , ,r
I - .:,. ..; �, ,�_z ,.� , , ��
` r- , i : - 1;11,�,.�.�_ - 11 I - � _, - ____ -, 0 J� � ----,! . ' RIM 95.10
__1 � I I , v I _. .
, I . ,,, . . , I�Z , I- -,.
. � 9 7" , _ � , ., 1 1
7 -, _! - -, � , , �
,".
.11 . .. 1: - . ---.. T. "" � - , - �, ,V", ,�PF_�,_ -
�1,lv,".j , /I 1) ,&,"'.5� - , �? -,,_-,_�_�-N , � , , " ,/
��
� , � I" � ------ , ��.� -1 "'D, I I
,
Z . . . . . . ___ "� �'
-,
..,
..''
..''
..''
..''.
6 "', ..... . __�
_�
9. �` ".)I __ _'. , - 11 _ ,l;,t,,_._.l� ,-,".,A X�ll , - � " I
. - . � - k. _n'.'�7".,_.,_v-L,, ,- ,�,i 9 , ,,,, " f (
... �' 1 -----.- ;
- '' i
.
- � . -15;
. I., t;l
LL. -, - �',z ;.% IE 93.93 (S) I I
I / � . � ".. m ---:, - :�l 6,�,, , - 1- ..e
� ,_ __1 �. , � ... I I
", i
/, .. I , - ,,5 _ Im�,_ -
e
1�_ I - 6 - ; ,,, e_ . - - _,,�,-7,_ _:_,
.
.
"-V� As . ,.,., , - ,r, r,z�� - ' Z I 1
q ,9�; ,Z,�,.�� , .; , � .�
I -1 I _,,�,t�r.,!,�� a A
I � " i lfflm ,� 7
q ", r ,,,� � , � . I
�l , ... 4 .. , ` 1, "
� , � , ,.,. _jv&Hq �,�'lll ,�/ '61f - ( -,,�� WERI ,�/ W, � � �1_ IE 91 -
" � I r* * '.�
, . ..,,---% I JL � �'. Y �l I IN " 't -�, .
'I.- �y " �,,; 1A
,I � (-). �.l " I �' - .,,- l'll_-"�::, - Y '-, \,�T-'A"WILD - .., I..- ,�,t, I
_V-�' o "SANIT! R i" 9L -,
I \_ 1 . - I ., _ -, ,,, I ING�_' /`�, *,,. � - - I - w . .43 (30 , E)
"" I-, ___..__-,_._,,�'A e I,- k Kf/>'�_,�,p- If.,
� -6? Z� - - - �_
�l _-) j, .. .,. . t 1 Z,f, � . ,�, 1 I I i
-, � P"'.)\ 11 o . t . 11 . -,, I "d I v ,,�, PL NG� q%.LN�;.Q1.T � i
" . -1.1, --F!� -- `�" , of ,
( i,, I"! � �� � i, I"', ' ------- --"-'-'-,,, ,t�0 e � 11 � /I--,- F "T T I-' I
.1111-.. i �. I`, ". _, � i " _� ,W) -1
I- . 1 . - END G'l' 1;1._lllH`_"_ ILY
C , ". 1- _ .-�11- " ",UMBI - .. ,�( ,,J / , - Ili
- I . ".. , ,,, ._,�L_ _�,_tu ,
F -,,- i .". ..e �,. �,,',) . , � / / /7 tl -, 1-,,-�,'� -L, 'VV_-�-- I � . . � L� L.,
- . / ,'..1/ , 61 /,�,.,,' ,-,"
", .. � j -- // Y-- . �11 ,-,,,, " . ,,� ', ./. ,
� � - I - � * . - ,-- �), ow ." , 7 ,�, � " , ,
_' / ..- gt'.. _11"l- - ,7 .4� N IE-1,A 9ROX, 1. ."I i U4��r� I " S I (" i
'.
_,_ '. I / -I ,,,�--lv-' 'k,'s- ? P 1� "
. "I" � - I . n " , . &,,,, _,'�, � � - - �� � �'ll - -- - `
() 17, ' 1,1,,�[[ ... C C�. i ! �", � �'_,' , . . � 1, ,� , , _ , / I �� I WEE �S 1, "') 1 JN E
� , i I .,I[ � - - � - ' � i I
11 �j .1. ,:) � "J4 .I.-H 11- '/l '-1.1 : f,- - - ". , 6Z -l" / -i
, ,- ! lj�, el , __ " .-( _.
. . - r;
, , I i . /" " ' �
, I X . �, , --..-.,., , �bo �, 'M d) .' ,),.,"
.. I ,!,' -- v d _".
" .. ,,', � _I ,-, n__,E___T.'._,,� .'.,,' RD W/ EC '' �
, 'C-P�* , _l%6_.___ � ___ .11
, � ;_ . " / � " I � , , - ,jz (�y 1__:,Jf_Y,�,,,'tr __�__
- - i i , I . .t. - r ,�/ - ,�I� 11 I I -1 - , .", I ", / - ./�� � t��,I` i 1-11 w., . _t, ,
I � . . , - ,' � /I 1�lzk 114�/ e, 1�,,' !I , .I, � ,e
'Al 'e, ,.r , r� .� �. , " 6, I - , - . - -; , -.1
"I . � " I - , - , 4, , ,;�' - -01 I �� " A .
. � __ � / " ,
" , , 1 - ... - " ,,- � ""', - , , _-- ". 'j, , V, �11 . � , � ,
�
. __ '_�� I I I ,:. . � I- _`1 /. .� J ". , ,�', 1 s- - ol , , I", ". 'CL 4 f , �. f
, .
., , � , � - -1 � � ,.��: 7" _. � I . il ,-� �, - .11 g, ,ol �,` � ,� 11 1� A' .-'I-- I I
- ,
I - � : .� .. F 'o, ,", 40'. ( .. 11 L - - �_,"' s�E�i' � -]
,� ,, ( )'� � , 1'40' -1 I �l ll� � *�, / ,�, -,�, i , " ,,,
� ,�_ _. - , 11
� .-- , -"f--- - I .", - _� , / I r -L
/, --: - . , I ,/ , ' rr- 1 N vr, --, [ " 'f" I �� - A �_ , ,; I ,w'-�, 4 4 1 1
.. 4 - ' / - ,� i I I - p�,,.1- I 1, �_ , ( I f., I , , , / / I
" I 11 , , - h " , I
, j .... . .. �� . 4, I 'L.
*
,_ I . .� _` . . * , - -, 4 I �`j
I �
� , . T -.,-. - , .11 -11 ,,� I 1�� _,,e _-, :�, - , -1 2, � ' - �PG
� A - .1 �
I � � - . 1�_f� , - ' " "' - - ..
.
.
.
�l � � , ..... . , 1� I �, ", � -, i . , -
I . .1 .. , , -, " c ;
. .4 . . .. ,� , �, - I , )j '. r, . I 2 ""A I (� j, c) - �,
- 0 I� ,, "p";'r- � , ;-i *� �J,, , - , .
- "I , - - - k I , ,? C - �_l w�
/� . - - ,��', -� , r, ,"� ,
K I , t I �
. , i 0 . ',�__ / /" t�, I e�� A.4_6I I 7--" ", - i '�- , " L-1 / j,,
I I _.. . ,l I I .1 I ", 1. '1�
''I, I I -, - 1, 5 .6-lul+.ou ,�
; I / i67,
, .. .. . - " � �!, _� � I , i
- A . ,
", 7 . .. � � 11 & ' - -r"Lu _' � - �i. I / c� "
I I . ' Z "i. - �
/I 11 0", . --i _1� - .j .6 ,'�" , ", / / BASEMENTL,--� , , / / ", ", 14
___ . .... - .z- ; , ,,f . e, -, ,
7 " - .- I- I . t ll�__ �, .? Z /' " I 4" � le., "i / ,, , , T ,/
., 4 j , . . -_ I - i ,,e , w �
"d / 1 � I .. . . -I- � �l __ / /I ',�, 2 ,/ � _�._
. -, / .11
. � /J' ""' / ' / , . � �� 1,
.,.. ..' :. . e� RAW DRAIN ,',� , j., ,/ / If I z I
. . V � I , . 1 ,,, ?I
- .1..' �. It I '.. r., " - ,�] 1. '.1 � 'l/ /11
'lz��_, W, Qp _11 _.'�.. �, RIM' 94.35 �l 1�1 / � "A'
,
, 11-11 . a 1 4_� 1 1 1 � � ' , _� " ' ,, "� / - ' " / I 3
-
l. :� .. . . , _'�
'
�
.1 ... . ;
_.,� -, A _. . - ----' 11 /I
__ - . � ' "' / ""
" i P\ . . � /� "'
, - �. . .
- , , ! .. .. . �" IR-Yi PAD RATIQ/DRAIN�y 0 / el '.
I - , , I . -w, / 11 ,,�(WNhEd EN T �' ��
.- _. ., � ....... .. �! � " f
,'. , I .. , - I 11 f � ,
, ..
- . .
.
- , ,/ ,F� ., . . / ,l / ' M -WITH TPkR Yl
, 11 I . . -�, '41 /
i . �. -...- ... , . � I I §T,6R9' DEltNT(bk, tYSt 11 I - SE AlE - /
.,...,�-� m I . . A. , . - I T "
�� - , , .. ; . . ,;f , . �l I C,� �l � /
., , � � I I �1' * ,� II-_v, - ,e / I I
.
. �
�
�
�
.- I ......': �,. j � -,.
.t - . � , I . �o -1 .
- . . � ,
,_,, I ) c . " gy IN,dNE) - k A /
. . - :, - , ", . I I - . ".1 , . - Al
'.. - � ... � ./ - , ,,, , ,\� I ,; � , i �l cn' 'p,
A.." - "
"_ /i . t.1t. ". - y A/ " , k 1� - , �
-`�.11 3 . . ... . .. - , --" / - ,/ r I,�^ - / , I I �, r
,
:1 .. ... , '41- ,
�, . - . - , . ,,;0� � '*. , , , ,
, � _j � i I I— . . ..., - . ; '. �,, jl� . " I -
-_., 11 � � - .1.. �/ �/, 1. I _/iii z -1 V, , / I.I/ � /., :�
- '""' I , - .1 - -, - ' -
" \ 11 � i. , , . . , " ,� i
I � _. " ", , . - , f - "' f , ., 7_�1`7' , /;
.� � � . . .. - ... . P,00,sbRAI� � - ,YX,,2��: ,
". _� . � .1;1 / 9,
� -f . . . . .:: . �1* �� �Aj ,
. . _/ - I -
., x , . .- , t - ,ill 11 / � e / . �_ /I Z i, './lr, ,
J I 1�. - - - - : It, -i ,,, " , , T11 / / ." ", - _� � /'A
�1 , - " -, , .I,. , . � --- _,. . �� �/RIM`9440,7' �' I '. 1� ",_/
.." .. .le � - . �
,;, t 1 . , A
,;, ; ,/ � ,J c
, , ,;, , 57 . i�:;ll , , , , 7A
-, " 11 - I '�-�** , , -- �,__��, / - __
'. .-�5-_rl, I - , "
Il ".. ..- � - � ,�, , ,,, ,,I ./ .,
'. : _ � t rl" - -1 ", I`- . __ I_ 4- ; . , r I
.-"%-) -.11 '\ 1,1' 11 ,,, ,�,,; , " �,,,,,. .", ''�_4_- , , ,
" lll_�_`_ I 1 '. � ?-/- . , I (, �, -
I . L-111 �' /�, - I h 1, / "I 11_1
I �1� /", z, :.l . '. �j-; I�i�,/ J,� -
�
" I..� � : t e i" I �v4 --,.,!,, I., I Z
j � " I - ��--, �' . - , ,,� . wr . , . �,;,�'l J �,v� ",v , i,� t ," _1 3
IF I "'e" P r '
I � I— � �U I_ 116, " " ./ / I 110 � � I
.1 11 "'. 'I', I
v �l -----' -I / '/ / '. - 0
0� - �' -,
I �_.
11 ; ..., . ?f � , �l I ""', 'If" l/ . " Ir, .��'i,
A 1, el . 1 '? ll� ,
�,, L . I I / ,�, 1�__, / - �'l �/. '. ,l .
,, � -d - 1 ::t,�k,� ",_2 __,I,;, uk's. �, -CW ., "-` � " x - f f 'i. - 1�'
,
1_11 I " -, �l I r� .1 / �' '� " /' I Al J,
- " ��,; , ji.) � I` X, ,�, � 11 � 'i l(l -�',
I I - 1, " elr 11 � -1 - I , -
/i � '� - , ,l �llrl f, � , X I
, w "'; , el "I
� .. .�- 11 *y ", Z - �ii D D., / -, ) , , � I . / � �
I . , .1 / - I /
..;-! N5" � ", 1� / ,/ r T �'
- �,%/ - , , ,I 11 . " . I I
,111 1 - : , i " �", / 11 , �,,/ I/ // . 11 2/ �"/. / -�' I
� . " ,
A It - .. I r ,� / ,"i -1 / .. � �� "I , - I
. i . :. I r il o"j, , ,/, ,-:1 "I � , � "_" Z_r X/ .. � Ic- �1' �-ll
, �
- ' "' SD :2, -:' ; " , "if, � � / . �,, , j / , ,; ,
A 1,0,1 ! .... - , \ ., / ,,, . , ."? �. 11 /; . , " /. / / / 1. ,- 11 r,
/ � , _�. I ,/` / / . .41 / " `14 I vy, -1 / / I :11 -
1 010.0'44/ft li .... .. , , / . �, �,, 11 I x
. �' "q
. . '_ � " Y / , �, / i - ", I./ � �_j r I
I 1, I.... 1 ,l ir . 11 "', /� 11 I' � :1, -le, � .1 14 1� �11 t (,\ I
",_ I - ", , . '/11, - -11
I - - , �
_
, I ,
. - -I' Lr / , t
I , I � / 11p, I, ,." ,
�; n I " " . I .x , �' , / " I/ I- � ,�,, ', / 11 I , ,
, . __
11, I � . ,, - / � t", /,k,7 � ,/ /, � "I '� ,., I t/ / Ir /I , � ,
I , .1-1 11 ,. 11 1� � I I I -,_� T-j
- 1' - - - ,?..-,d 4,�;, ,� ,_ , . 1, �l , , .� I
-
�
/ i - 0 -F;� i -. ." I �Z__@,, 11), I. � / I / / - -1
I - � ," , " �� ��� '. , , � ,� I ,/ � ,,-- , . . / .11 � I � 4.. 1
ly �, ;� I
0 / I o _1 0 :- --- 1 �� , '. " �! x, r A , - / .,��_ / .11 Al", ". , � , 1, , ,,, 1. ", I � -1 oli
r i - .1. 11 III' "---/ ll'i",L,z�,"�,��-I'll,�",,/-""�,�,,�lI ,.lz " '. - 1� ,)"` .1 / / 11 1-1 I � � I ,.,, i
11 I _,,4_z-.al - - - .2, __ / /
I I � 4 � 'r , z �1_ ./. )l
. _4_4 _'. /
. - . i '. - - _ - �:-:,�/ - ., , -,, � ,
, : I 4 1 , � . � - , j,:� / ', -
./ 0 ,_ .: I .1 � / � i I � �� , " 9� - I
", 1 I ./ ./ -,, � �,� ""t , / �l /� � I
" 0 1 1�.- .. I �, ""/l �z I t, fd ,/ � . , / , "
ii I �� .11 I f ��v � , � I
�, � e-4 ,� . . I . - . I , � , ,,, I T
k -�j 7 . - � I- 11 . 11 �143' � I . , .
�/ - � ) I I I I / � .� ,�l /.- I -1. I
�1� - , _�;* f, - ." " � I /
I I i I 11 .. - I I /' - / , - t' , _-, / I / � -.1 Z ,,
. _.. . I I "I / � ./ �i / - " 1,.,�, ,- , - ,- __ ". I I
) Z ! / I .1 ni A, . ,�' / - ,' I 3'
j . - - .k. r � I" � . � - � / i'6;�.` . - ,�' - . " .", � "5
") I -;?� I
I/ . . 1� . ,5 � , y I- I � : - ., - - /"4_1012.3
� . - � ... i >�n,o, , - 4- ,�,� ,� . / ,� jL*, �
� 1� � , / . - ,..-, , * / il 61,9
,
l .. I ,I 4, ". I . I �i " d, 'j
/'LANDS APE', � I / / , - ,l e, """ " .. , � ,,, /'.,,�, , / - . I , , ,
r-� � ? I �� .I .. 1 , ,�. , I _� ,,,., .r / �,,rr p/ , A `�\_5,,, -
1, I I z . - . i � "I I " . 11 , _�.l -, �l I I � ,,,
;
" i -_, ___. ,-i bR'kjN-6" !I'- .' , 111i e ,�ll � 111:11/ "I" I �
,-, / ", I _el_ _W_ . , ,:,� ',_j f , . , . ? - lll�
- � - j- Im -i - � ,- / � V�_�� ` ,,-,,,f /. './ ,,,, - 11 Am'� "I
�
�� , �, � .., . I / .11 " , / / "', - � /
, 09.00 I 11 � '� � - I / I
. . . . I / �, 11 ,�
.. - � , z ...... . -11 I � :/ _�, � ,,, I ,/ / , , ,,, I , �l 11 .." 0 'l-,"', I
. - " _ . , � I I .i, 1,, Im I � " -,
'_ 11 VM� - ", " _�_�
. I'l ,�'ed I .- 11. ',
I �, u -94
. � ,
... I \1 . . . I
.A - ". P -1 .,
. . . . I
I : �,T'. 1 � . " . , . L, �- I. -4*. , "
, . . - �"-";,
I . - , I cl , , � � &L -, 7",
� , I, 1� �5 -, * - 1 , - ;. �,, � -
G! � ,,f7- ! ,., T : .1 l! Ij 11 � �,� .1, T�
�. ll� - , 1_ ,_ � _��,' Ill - .-.-.--.. - -
�`N'jNC`Ef"_ ,11 I ��", L. _ 77:::��.,'��
.1, , � � �%l , I'll
.. � ". ,��'%lz I ,
4�� c
. " 1�71MU� A I "',L
. 4 44��,; P - � ". ",
!� - . .4-�� �, I I,
� �, _,� -, I . - , - . -l.; 7, ,,�"._ ,111,1
� �.l .,:;::.; " .,A - I., __ 1
- . � I - I . .
i � _l:-!7-p, 1 f-,Tp- . I-_ " � ". � . I 11,1, ", '
' "
I � 1 _' -_ ,_ _� _j ,L,��;, ,,'� i
'RE i -j .. . .... � , ,�',,�,,�,j-
'Y',v I 1)__?�,f��L_ -,- - - .1 �
.. .
" Jt: -,�,.�_ , I ...._4 .t- - -
�11 i;_`__ If .� - ,�,C,; .
. ; * t, - --!,L?-,,,',4,-,,��,l
. _-,
.. _:_ 10) I..."
- I ,,P", I', � ,��,
; I_ ell'. _� . . . . . . . . . . . , ... "I'll, � -
,'- J,�� [� . 'a "��,'i7i ,�,'�,
, � 0�.. fT r' t, I I ", ,. Ill.', i � I'll, 1'�,
"
" _1�
Lt I i �, 'P, 1-I �__ �l 1, . ; 4 - - ., ,, - "
-1 � t 3 -, - � ,z�,M
* , 4 '�- - ,.� li
, '. �, i Ill ,,�, I
I - ,� � ����� "N'l-t,
I -, - li'qf'_`_:_ r-, ,_ , , I . , I 1� . lli,l .- !�,_AA�, , �� I ,
�j 1 "?, ., I , 1.
"., , I m [7 J �
1 L�:�.
I
,
�
- i � "I i__ [j " - I , `2' -� I
" .
11 , L-) _� I
,
�
L; , ��. " ll��-
, � -
C� - -
)�.,,,_' ,.
. � i t --,,.,,- " ;
,;
, ,��
- - - - 77��t7_ � �' �'_. ;
1-1- . '. . ,
I
I �' k �2-"" - �_
I'll!' .1 - �_�l , 1'�,,� � -
C3 A [713 "�v,"A�'!.�,V�r-:'-----"---,--', I- t � i�'-,,,�,�,,, I
"
9 11 1�,l
, . � I—-
, I
I-01 If" - ..".I Q 1-11 I " -, 11
t 11 -) � . ,,0.,�
01, i , �. 11
� , (_ -� , _ __ _ , 111,�l ": `�`. �,�� �,,, � Z i._
� (v, I , -, , _____ ;1. ,:: 1`�l � I,, �
t j1NI-) 1-dLBA! I - J � , �, " ;
c --l"',
4 �, -l" ,
,, � �
�� -, -
,11
� cc
C) ����,rl _c
1- il
"
- .1 I
�
,
el;�'. 7 i 11 C') � -
,�., 1-1, - .�,
, . I - - '_ " - % ", ,, ,
.
I ; (�, I � t" �
t I'll 'I I' �J ._,,, ,I I 1 �;vl 11 � jllllll _�11� 6,
__ , �� I,, � ,j El. A " ", ; 7��`_'� �
�
�
-
ll�,
� U:� ,.�...-',��� �
�
- _.
; - lll�
a '. � , , 0 ,-,.,.,. �_ .t
, " - , [ 1-1 -,
" "',
I I -I ,1_ _.
I -
I 11 �_
0, lx,) 7' N11, 0 [� 1- 1 1 (.k G I'll, 1 \ � "l L.. , ,q 't.-,. �'n'- ,. .
. �:'
.1
A��ll
I
-, o �'5, � �_ __
, " � -, ea lu_ I
-
, � _ __ F ;;;;; I %, 1, I,— �
I -
-, I -, I I 111 ," '_ K_",,..,_, - 41
/",, � i i � "'k � i 1, . I �, I - I �
-
-.1- ��11-14, 1 i 1, L _.___. ..� ,-j'! ,","U,,I 11'� ,I- I
I— -,
I I
l___l ..
�
i
�
i I
- __1
�
L_J �,
�tlll_l
('11'
5
,��
"I
-
"'
1_1�_
� � ,,�
, "
,;�,,�
`
�
�
Y
k �
\
.
/
1, '1�
_2
11,
, , !�, ,
11 __l .
_....- f I (.�,
� I �11-, /
, " i �, I
�- ,- 'N,
, -
,,,, � �
, C, _
� I jr,;l I
I i m
,�.. r-, _�7f 11. (l
.= -1 �
i i
,� 1,
, I
I
_ -,
I U 3 � ,., 'i
t -
1, �l
- - -
-
( !%If ... �
FO �) !Fl, L)
�
,� ; c" �l ; � Ch A 11E.- i, � --i I ��, 1 I- n C, ,
M,)!\J,_lj-,,qt_�-�� � W� �,'P`�,r
i �
,., -
. I . .
L NOD UTILITIES PLANaLl
DRAINAGE A`
5
D
i 01,11-VIER P0l__[[_`
1�_ I
I,, 7- \__
�-') -
1"', 1___� i
r f 0
T_ I I
1�__ �B
I—- 3: \jD-\ I \_C)l � 9 .
...
�
�
Lo I I
1�_ I I
.
�
N
0
0
0 1 1
0 1 1
m
_71
I
I
-1 �
�
.
I -1 F � .
. �` "" A R A (`i - --' .
'
.---
'
I- -, I
,N!'- 1 D r (,�, q,
I , , 1. tll- v: i ,,, I . . I I
24"r I -�U(-)j Jo --t-j�)r-r- .
( �_'Ar"llil"'n 'A",", i"j-1-
r-Ii-- I 1. I— I.- I I
N � ",I �,-
-) "'. -
�_, 'V.,
I b
" , , I ,� ,
, I It I, " I
1`_ �11 1
I
,_�__",,
�.,
,
,
1,
��_�,l
1-:1 G ,I, sl",�' I 1
C�-'5r GARPV�A',-_
'� " "' � j I I
,� "' * i J
." DN [_"', E
"
"I
i
,
'_ r 200 r,
, --'- ' N ,; i_l N,._.
"', -, r-ND 01F FIEN" -
. r, � I !It,
, ,��z t _ t � i . 11 -
,_1 1� � ,. 1 1 � ".1 �11
e � i .
I
i I vl.vi IE- Sj T (" F ! IN'
� i� � ,
, ,
. -
=j 1 --- ,��. ov _. -
- - - - - - - - - - - - - - -
j
I
I "' 4 � '�','; I
�___.3� � 1*
x
\ ,,rL."r ,� /�') " .1
; '--I A !"D -, -
L, , �� llgi',,Vl I * 7 I -"I
__ ,Nt:. � , � �, ., L � -, ,"',
� - , -) RE I I'
I / I \ L L I H'I "
�, p. � 1 1;� 4 rl ,-, in
1 , ,
Al_ ll,;l �"Al i f I'l k1l; Vil ��/11�r
I . --
I I- .� . .1.11 ,Il- � k��,,,-
�fr i,"
_11- I,-_,", ../ �-..-,,.�,��l,.-.,.��,,�p,--:.,.�,-i".-..:,-�, J"',_
, ,..-,. -
1 --- � ,-,- ,55
- , =77,17.777,7777,77 -, - -, - - - - - - - - -
I=_ ___, 'I !-I I-*-' __ ----------,--..,--.--.--,-..---.--------.-,--,-.------; _ ______ ___--___ _-_____________
I
�_,. � �- 1'. L -
.
- - - - -
. I r- _ f� , 7 r- - �7
I\ ;--,) / � .
I , �, - �,
I j; i �- - J I � , A -, 1%
- _ -,) Cr ,_.� ,_,� w
ff __l f
ILIl1 //1
N -
_�
CALL BEFORE YOU DIG
1-800-424-5555
FOR FIELD LOCATION OF UNDERGROUND UTILITIES
�l
-
- - -
� .-A ,
j'. -- c..,
- -,I 1 !� '-A-
"), ., , ,
_ I_; , -1 i
(A T , L PE-117 Y)
GRAPHIC SCALE
, , ", , '' , _ � , ",
"I', ,� 4 , ,
1'1�1111' � , "' ",
, -,""I'll"', �_ � " " `1`1',�',"l "N""."ll
" , 11 ,� "
`,',,","",",",,, ll""I",""��,,=,,,"",",�""","",��""�"""', " �l 1!`!1�1'1 ?"', 'I'l""I'll"",,"��"1""""",""""ll","'I 'I'l""Il",�""I'll",,�"I'l"�'I l,�ll""I'�'�Ill",",",�'ll'�""Il:,'I'll",","�"", "'I'll'i'll""ll 611
'k i =,� I I 1�1 ;,,,,�,,_�,,, ___ __
,;:_ , __,
M",�'ll""I'�,,�"Mll",'�'I'll""I"-,�""Ml�,,��'I'll""",�,'ll",�ll,�,%,�,,/,,,/,"""";"",,,,,,,,,', ��,,,,,,,,,�,,,,,,,"��,,,,'e,,"�""�,,�,,:�,,�,'�:�""","�:,�'l"�', """,
", ",
- I � �, .... ..... . m - __�Il
(D CHANNEL DRAIN PER DETAIL 9/C2.1
@ 6" 0 STORM DRAIN LEADER (SD)
0 4" 0 PERFORATED FOUNDATION DRAIN (FD) EXCEPT SOLID WALL FOR EXTENSION TO CB.
0 6" 0 TIGHT LINE ROOF DRAIN (RD)
0 Cl FANOUT PER DETAIL 6/C2.1
@ DOMES11C WATER SERVICE AND METER PER CITY STD. - ASSUMED TO BE l-)r - TO BE CONFIRMED BY THE DESIGN/BUILD PLUMBING-MECH. CONTRACTOR &
(SEE SHT NOTE 5)
0 FIRE SPRINKLER WATER SERVICE AND DDCVA IN VAULT PER CITY STD. (ASSUMED 4ms' TO BE CONFIRMED BY THE DESIGN/BUILD FIRE SPRINKLER CONTRACTOR, 4
SEE SHT NOTE 4). VAULT TO BE "UTILITY VAULT 5106-LAn AS CONFIRMED BY THE CITY OF EDMONDS FOR A 4" FIRE WATER SERVICE.A A
(�) BUILD NEW CB TYPE 2 OVER EXISTING SD LINE
0 CONNECT NEW SANITARY SEWER BLDG. CONNECTION TO EXISTING 10" SS WITH CITY APPROVED "INSERTA TEE- (SEE SHEET NOTE 1)
SWATER SERVICE TAPS PER CITY STANDARDS .
0) 30" 0 DETEN11ON PIPE CMP OR N-12ADS PER CITY OF EDMONDS REQUIREMENTS AND PROFILE THIS SHEET
. e POST INDICATOR VALVE (PIV) - LINE SIZE PER SPRINLKLER DESIGNER.
@ FIRE DEPARTMENT CONNECTION (FDC) - PER SPRINKLER DESIGNER. MECHANICAL SAHLL ROUTE THE FDC PIPE FROM THE SPRINKLER RISER ROOM TO THEA
WALL MOUNT FDC (WHERE SHOWN) WITH ABOVE SLAB, WALL OR CEILING HUNG PIPE.
aSANITARY SEWER CLEANOUT ON PUBLIC SIDE OF PROPERTY LINE PER DETAIL 6/C2.1 EXCEPT WITH LOCKING "LAMPHOLE" D. &
6 ECTING PA110 DRAINS TO STORM DETENTION SYSTEM. iNSTALL,.MTH 0.010 ft/ft PIPE SLOPE. &
*
SHEET NOTES.
1. THE EXISTING SANITARY SEWER MAIN AND STORM DRAIN PIPE HAVE BEEN FIELD LOCATED AT ADJACENT STRUCTURES (MH/CB) TO EAST AND WEST. ELEVATIONS FOR
CONNECTIONS HAVE BEEN CALCULATED FROM THIS DATA ASSUMING A STRAIGHT PIPE SLOPE. THE HORIZONTAL LOCATION OF THE EXISTING WATERMAN HAS BEN FIELD
LOCATED IN SIMILAR FASHION, HOWEVER THE VERTICAL INFORMATION FOUND IN THE FIELD VARIED BY UP TO 2.5'. AS A RESULT, THERE REMAINS A POTENTIAL FOR CONFLICT A
AT PIPE CROSSINGS. CONTRACTOR SHALL FIELD VERIFY THE DEPTH OF THE EXIS11NG WATERMAN AT CROSSINGS PRIOR TO CONSTRUCTING STORM OR SANITARY SEWER
SYSTEMS. NOTIFY TEC (CIVIL ENGINEER) IN THE EVENT OF CONFLICT.
2. PATIO DRAINS SHALL BE 4" 0 SATIN BRASS, "NDS" 9109B (SEE DETAIL 10/C2.1) OR APPROVED EQUAL (UNLESS OTHERWISE SPECIFIED BY ARCH.)
3. STORM DRAIN DETENTION SHALL BE PER CITY OF EDMONDS "DRAINAGE SYSTEM STANDARDS" HANDOUT.
.
4. FIRE SERVICE CONNECTION WILL BE SIZED BY THE DESIGN/BUILD FIRE SPRINKLER DESIGNER (THIS DRAWING CONSERVATIVELY ASSUMES 4"0). THE CITY REQUIREMENTS
CHANGE FOR 2"0 AND SMALLER. CONTRACTOR SHALL COORDINATE. ALL 4" FIRE SERVICE PIPE SHALLL BE DUCTILE IRON, CL 50, PER AWWA C151, AND SHALL BE INSTALLED A
WITH 3' MINIMUM COVER.. A4
5. DOMESTIC WATER SERVICE WILL BE SIZED BY THE DESIGN/BUILD PLUMBING -MECHANICAL CONTRACTOR. THIS DRAWING ASSUMES l-)ro - CONTRACTOR SHALL NOTE THAT
CITY REQUIREMENTS FOR 2"0 INCLUDE A 12"xl2"X2" TEE AT THE MAIN AND A 2" RESILIENT SEATED GATE VALVE PLUS A REVISED VALVLE LAYOUT IN COORDINATION WITH
THE FIRE SPRINKLER SERVICE TAP. . A4
.
___
6. FOR ALL UTILITY TRENCHES IN THE PUBLIC RIGHT-OF-WAY, CONTROLLED DENSITY FILL (CDF), 2 SACK MIX, SHALL BE USED AS BACKFILL OVER THE PIPE ZONE, UP TO
THE BOTTOM OF THE EXISTING PAVEMENT OR 3" BELOW FINISH GRADE, WHICH EVE-0-11S-LOWEST. A4
�_,_
...............................................................
.
. . . . . . . . .
. . . . 1. . . . . I
. . . - . . . . .
. . . . . . . . .
.
. a . . . . . .
. 1-40 . . . . . I
1.0 c; 1=1 00 .
,, =) . 0 ,--,I=:,
: . . . C14 . =3 0 . . . . . . . . . . . : . . . . . . . : . . . . . . . : . . . . . . . : . . . 1. c� . = E3 . . . . . :100
. C:) � --., . . . . C'4 M - .
6 . 1--�,�
. U.1 1 C, c, c) . . . . n C)
rn to . * LAJ =1 - to ".)
�__---_�,_,c,,>_p;, *_:,.,_.:_,. ___ t /,,'- 8 0 OUTLET . - . -4: A *
. � c5g 0!
m (" . - CONTRPL- - - -, _-, __-_ __ 1._ _.__,..__'___.__.__ ___.- * (n n - ,
I m j�g I— � 11c- M_ cp_ .--,-- -,
C-5 .= uj W - . . M 3i�.:!E LIJ LAJ -f
f . . . C.> ce_ - -
I . .. . . t
6" MIN. CLEARENCE MEASURED I . / I . - . . .
-
FROM TOP OF CONC. BOX t . . i - I . . . I . 1._____�
I. . . 1. t
OR RISER � I z . I . . 1. MIN I
. . . . . - t
. i I -
I . I i . . . I
A � . & 25 LF 30" 0 DET PIPE 0 0.005ft/ft . . �
. f . . . .
__ . . . t
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. a . [ .
f * , f - - - '. * * * I I * I . . . : . . . . . .
. . t 90
. f . . . .
I . . . . t
. I . . .
� � . . �
. f . . . .
9, kti� - -111, . . . . t
� I F , N i , I . . . . I
N-, . DATUM =17
-
'*'--ORInCE 3C 0 85.00
.
" r*.: - 14-
co fl-
(" m rl:
I . � m
I . -
�
.
�
I
I - I
DET. PIPE PROFILE 0+00
I
SCALE: 1"=5' 1
MARKED "DRAIN" WITH
LOCKING BOLTS.
I __
RIM-95. -
. 17 = i
Cl EANOUT GATE. '_ -.; -4 -- '.. -, - .- MA4
T .. t �.,-' - . .__
- .
. .. ,
. - ..
- - . " A
- 6 MIN --- - i OVERFLOW ELEV. 93.93
X. .'1_1 is -
. . . A .
f .. - - I
. _'� �N
.
..
.. I
INLET PIPE- - I . il
I OUTLET PIPE I
I
-
.. -1,
-
A IE 91.30 .1. .:.
- , i . . IE 91.30 A
._.11; - -
. _. - - ____-- PIPE SUPPORT(S):
- . ,
�
. I .
8" 0 RISER PIPE .. __ . .-
.
.
.
* _
. .
.
�: 0) __ 30 X .090"
POLYPROPYLENE ': '. -.. ,.: - - ". i: .t"_: �,�_
... . .. -.. .:_,�
STEPS OR LADDER. _i.. A . . . - - . RESTRICTOR PLATE WITH 3C
DRILLED ORIFICE
FLOW CONTROL STRUCTURE NOTE: 'ALL DIMENSIONS AND
SHALL BE CB TYPE-2, 54- 0 MATERIAL SPECIFICATIONS NOT
PER WSDOT/APWA STD PLAN SHOWN HERE SHALL BE PER STD
B-3 (APPURTENANCES NOT PLAN
SHOWN FOR CLARITY)
PLAN
RECEIVED
JAN 1 9 2005
I
--I
:
:
�!
i
3:
C)
Z
0
m
z
W
*
5:
:z
n
z
Ld
cr.
0
<
5
LLJ
Q
=
m
M
m
m
m
!->
0
0
8
0
U
>_
C-)
>_
U
>_
U
LLI
M
=
LLJ
U
z
W
z
LLI
I
I
I
<
<
Ln.
'.
4z
CD
Z�.
L'i
r�l
c%4
I
t__
��,
`--l-
--,
1-1
C<l
-I-
I
<j<
<1
<
1
C-4
4z
�_
�
I-
��
CL
ce-
co
1
1
I
6
to
...
..
. . A S
.
. ,
.
. <1
,
.
.
. I co
.
.
.
Go .
CD *. 0
*
:
�.-V*g
I
;
IwAvft
-
.
.
.
-
-
I 11-
I , , ,'� ..
.... "I 1
MENNEN
M Empli
on "
Mu
I
ME
on
Ad
to
No",
111"',
M
11
ME 11
oi
M"
IN I
MEN
I I
I
ME,
,
1,
i �
, m
11 i
I
I �
; ,
mmi
son
111-Imm"o,
mom
I 1 I I
I
-M " ,
Imll "
...
'In'
ll
�
I
m
ME
Ji-
wommil"
I'�
,
� z
=) �
z (L
in
w
�
5 g
() 113
tu- z
w .<
fE �
0)
z I
0
�- 9
A< a
0 i
I
0
w
k
��4
Is"
,
=0
"
0
I I
IT,
w I A
o
(.�
c A
C-4 cm
; -a OD 00
F;r
Is
& 4 A .1
-5 N
*
, .0
r
:5 9 't
0
_.C� w
u
�2 ,6 .
0
�:E 4
10 c
Rm -a
Rx
J�
- ,.R 1pla
SEPT. 20, 2002
Sheet
-
kou4so'4'r"l a 2
0
N
SCALE: 1"=10'
( IN FEET )
I inch = 10 M
F.0 STRUCTURE
SCALE: 1"=3'
City Engineer
-
Date I I Sheet . of .
IF 88, "3
........... . .....
q—,
. . .. ......
SD
1 - 12"xl 2*x4" TEE (FL) %11%Wlvll
2 - 12" RESLIENT GATE VALE (FLxMJ) (%*SEE-
1 - 40 RESILIENT GATE VALVE (FLxMJ)
2 - 12-,pl,,--�P0OI;-.,T9 FITA PLr_lx
U ( _ ) -
(SEE SHTJ NOTE RNER
Vv,
O.b E.Asr 5
00.
FRIIND Rl"BAF, (!,t CAP I-S
91755 0.113' ILAS—l' &. 0. -ip2 TYPE 1
RIM 95.50
SOU'rH OF U.)RNIER IE-92.00_(6n,
IE 91.90
Rou 77,79 771
51141
A FI'Rf.*.'.' I'S'
12`0' W[..S_l OF' 1-111E NIORT11 WE f
1 11 1 J
C0RI\lEll'-," OF, THIS F)l"OPERTY A' ONG.
[,"AYI-ON STRIEE'll, (D
A
F'EN('.'E ("'ORNER
0 5 ' VVE I I NE
vo�
A
<
C 0 1, q C R\ E J
r
WIRE FENCL
OF FENCE
0, 2' 'VVESIF CN' LINE'
("'A�'S
"OUK REBAF� f..\pr
1 ( 017 �5 0,39
LS L.AST
0 � 0' 7' 11OR'll-I (.0" 0 F)� N f-'R
CAP"/1-1 A 1 N
R I M __-_: 10 �-5. ,--) 9
K)UND MONIUMD-11' IN CASJ'_'_'
DRAINAGE ArND UTILITIES PLANI
SCALE: 1"=10'
C13 TYPE 2-48- W1 SOLID LID
(BUILD OVER EXISTING LINE)
RIM 95.00 (MATCH EXIST.) A
IE 90.86 (CALC'd EXIST.)
IE (8-, S) 91.05 (MATCH EXIST. SPRING LINES)
.. . .......
!Y
6 �5 19
J.-
P R 0,j[_:. ("J "K NAIL. AND '3"
WA'_"'HER SEJ IN FrOf.) OF CURB
J/11EVATION = 97..4,3
sT. WAI.-TERMAIN DEPTH
UCTION OF,f!ROPA$E�
I _. - w
'AN16-MRM DRA I
CHECK FOR CONFLICT.
5 0
9 7.8 9
p 0& �-�) 3/
N `F ORNE
7— FIE. �l IER 0 4'
I
2' WES T
REBAI`� WITI-i
At-11flVIINUtvi ("AP
ENCE
IC - W/
,CB TYPE 2-48
P)SOLID LID
uuu uu
:'_�MIM95.1 �O��
IE 93.93 (S) A
IE 91.43 (30', E)
1
\J `E
()F" FEN(,
WEST OF t-INIE
0
Lo
0
0
0
0
GA R A G
J
INSIDE 01
j
,,�.24-" DEC10M.,16 I'F�EE
').3
G
,7 A R A' E
"ON 1_1NE
2
[7
A_ D OF F"*.*.NCF-
_ST (.')F' I.-INE
0
1' /8" FTBAR VVIl"ll
AILUMINUM (.lAP
�04,� 55
P 0 VVI R P 0 L. tE
E
8 95 6 "j,`5 " W
MAT)L-E STRF! /E/-l- _J7T
— --------- ------- --
S
\_o� �9
CALL BEFORE YOU DIG
1-800-424-5555
FOR FIELD LOCATION OF UNDERGROUND UTILITIES
(ALLEY)
GRAPHIC SCALE
0 5 10 20
( IN FEET )
I Inch = 10 ft.
'j"ONSTRUCTION N
TES:
CHANNEL DRAIN PER DETAIL 9/C2.1
6" 0 STORM DRAIN LEADER (SD)
4" 0 PERFORATED FOUNDATION DRAIN (FD) EXCEPT SOLID WALL FOR EXTENSION TO CB.
6" 0 TIGHT LINE ROOF DRAIN (RD)
CLEANOUT PER DETAIL 6/C2.1
DOMESTIC WATER SERVICE AND METER PER CITY STD. - ASSUMED TO BE l-)f - TO BE CONFIRMED BY THE DESIGN/BUILD PLUM ING-MECH. CONTRACTORA
(SEESHTNOTE 5) . 8 4
FIRE SPRINKLER WATER SERVICE AND DDCVA PER CITY STD. - ASSUMED TO BE 4" - TO BE CONFIRMED BY THE DESIGN/BUILD FIRE SPRINKLER CONTRACTOR
(SEE SHT NOTE 4) A4
BUILD NEW CB TYPE 2 OVER EXISTING SD LINE
CONNECT NEW SANITARY SEWER BLDG. CONNECTION TO EXISTING 10" SS WITH CITY APPROVED "INSERTA TEE" (SEE SHEET NOTE 1)
SWATER SERVICE TAPS PER CITY STANDARDS
a30" 0 DETENTION PIPE CMP OR N-12ADS PER CITY OF EDMONDS REQUIREMENTS AND PROFILE THIS SHEET
@ POST INDICATOR VALVE (PIV) - LINE SIZE PER SPRINLKLER DESIGNER.
FIRE DEPARTMENT CONNECTION (FDC) - PER SPRINKLER DESIGNER. MECHANICAL SAHLL ROUTE THE FDC PIPE FROM THE SPRINKLER RISER ROOM TO THEA
WALL MOUNT FDC (WHERE SHOWN) WITH ABOVE SLAB, WALL OR CEILING HUNG PIPE.
SANITARY SEWER CLEANOUT ON PUBLIC SIDE OF PROPERTY LINE PER DETAIL 6/C2.1 EXCEPT WITH LOCKING -LAMPHOLE- COVER PER CITY STANDARD. A4
4" PVC DRAIN LINE CONNECTING PATIO DRAINS TO STORM DETENTION SYSTEM. INSTALL WITH 0.010 ft/ft PIPE SLOPE. A4
SHEET NOTES:
1. THE EXISTING SANITARY SEWER MAIN AND STORM DRAIN PIPE HAVE BEEN FIELD LOCATED AT ADJACENT STRUCTURES (MH/CB) TO EAST AND WEST. ELEVATIONS FOR
CONNECTIONS HAVE BEEN CALCULATED FROM THIS DATA ASSUMING A STRAIGHT PIPE SLOPE. THE HORIZONTAL LOCATION OF THE EXISTING WATERMAIN HAS BEEN FIELD
LOCATED IN SIMILAR FASHION, HOWEVER THE VERTICAL INFORMATION FOUND IN THE FIELD VARIED BY UP TO 2.5'. AS A RESULT, THERE REMAINS A POTENTIAL FOR CONFLICT A
AT PIPE CROSSINGS. CONTRACTOR SHALL FIELD VERIFY THE DEPTH OF THE EXISTING WATERMAIN AT CROSSINGS PRIOR TO CONSTRUCTING STORM OR SANITARY SEWER
SYSTEMS. NOTIFY TEC (CIVIL ENGINEER) IN THE EVENT OF CONFLICT.
2. PA110 DRAINS SHALL BE 4" 0 SATIN BRASS, -NDS- 91098. (SEE DETAIL 10/02.11) OR APPROVED EQUAL .(UNLESS OTHERWISE SPECIFIED BY ARCH.)
3. STORM DRAIN DETENTION SHALL BE PER CITY OF EDMONDS "DRAINAGE SYSTEM STANDARDS" HANDOUT.
4. FIRE SERVICE CONNECTION WILL BE SIZED BY THE DESIGN/BUILD FIRE SPRINKLER DESIGNER (THIS DRAWING CONSERVATIVELY ASSUMES 4-0). THE CITY REQUIREMENTS
CHANGE FOR 2"0 AND SMALLER. CONTRACTOR SHALL COORDINATE. ALL 4" FIRE SERVICE PIPE SHALLL BE DUCTILE IRON, CL 50, PER AWWA C151, AND SHALL BE INSTALLED A
WITH 3' MINIMUM COVER.. A4
5. DOMESTIC WATER SERVICE WILL BE SIZED BY THE DESIGN/BUILD PLUMBING -MECHANICAL CONTRACTOR. THIS DRAWING ASSUMES l-)rO - CONTRACTOR SHALL NOTE THAT
CITY REQUIREMENTS FOR 2"0 INCLUDE A 12"xl2"X2m TEE AT THE MAIN AND A 2" RESILIENT SEATED GATE VALVE PLUS A REVISED VALVLE LAYOUT IN COORDINATION WITH
THE FIRE SPRINKLER SERVICE TAP. &
6. FOR ALL UTILITY TRENCHES IN THE PUBLIC RIGHT-OF-WAY, CONTROLLED DE—NSITY-FILL (CDF), 2 SACK MIX, SHALL BE USED AS BACKFILL OVER THE PIPE ZONE, UP To
THE BOTTOM OF THE EXISTING PAVEMENT OR 30 BELOW FINISH GRADE, WHICH EVER IS LO-kST. 4
A
7- IRKIC-ATIOW :5Y:5-re_tA 0P_,5l6%Wr5'Y' �A,005rApis' C_z;ql*KAr_j%5p_: '514AL[-
BE 0Er=I&f4r-,D AtJo c4H-5TP_LJC�7sP IW WITH C11-Y 5Tz%.Wt5Ap_05.
..... :100
cg',
n
C� CD LLJ =
ui 8" 0 OUTLET A
otd 0! -t
-CONTRPL— u5c" V) ,
;�m m
LU UJ
m
6" MIN. CLEARENCE MEASURED
FROM TOP OF CONC. BOX - - - - - - -
OR RISER MIN
_LMIN
A 25 LF 31f 0 DET PIPE 0 0.005ft/ft
. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
qu
9, kff
DATUM ELEV
'��ORIFICE 3C 0 85.00
cl!
C" Cn
DET., PIPE PROFILE 0+00
SCALE: 1"=5'
ROUND SOLID COVER
MARKED nDRAIN' WITH
LOCKING BOLTS.
A4
RIM 95.93
CLEANOUT GATE: A4
SHEAR GATE.
C-4
6 MI OVERFLOW ELEV. 93.93
MIN
INLET PIPE -
OUTLET PIPE1
i193
w
A IE 91.30 IE 91.30 A
PIPE SUPPORT(S):
8" 0 RISER PIPE
. . ........... . . . .
CD
POLYPROPYLENE 3* X .090"
RESTRICTOR PLATE WITH
v
STEPS OR LADDER.
DRILLED ORIFICE
FLOW CONTROL STRUCTURE NOTE: ALL DIMENSIONS AND
SHALL BE CB TYPE-2, 54- 0 MATERIAL SPECIFICATIONS NOT
PER WSDOT/APWA STD PLAN SHOWN HERE SHALL BE PER STD
B-3 (APPURTENANCES NOT PLAN
SHOWN FOR CLARITY)
F.0 STRUCTURE
SCALE: V=3'
APPROVED FOR
C., V CONSTRUCTION
ns� City Engineer Date
_j
W
B::
Bc
C)
z
0
w
U)
z
LLj
M
V)
M
W
m
V)
M
LLJ
m
m
0
m
0
m
u
z
L'i
U
z
LLj
u
z
W
C)
C',
L0
C'j
La
Z
L 0
CINI
16-
a -
to
C
.0
C
IN
No.
5
on
IN
111
mom
11
ON
no
no"
on
ME
low
on
mm,
w,
ONE
Sol
no
-
z Co
w
Q
w
z
0
.0
tA
0
w
90
0 WZ
Sheet
lomftk�
Sheet of
23
22-1/4"
TYPICAL
SLOPE 1: 12
20" METAL FRAME
MIN. ___x
AND GRATE
ADJUSTMENT
RING (TYP)
.0
12" RISER
SECTION (TYP)
ji 7 M
12"
;1
INLET PIPE
SUMP
CAPACITY'
5 CU. FT.
26" 4
_3
4"
ELEVATION
CATCH BASIN TYPE 1
SCALE: N.T.S.
u") r-
El 11 1
34"
NOTE: PRECAST CB TYPE 1
SHALL BE PER WSDOT/APWA
STD. PLAN B-1, AND IS
SHOWN HERE FOR REFERENCE
ONLY - STD. PLAN SHALL
CONTROL
TYPICAL
2 -low a =
METAL FRAME
SLOPE 1: 12
M
X
AND GRATE
I
00
2'-0-
PRECAST
CONCRETE
X A
A
POLYPROPYLENE
sTEPSAADDER
E::=
C-4
skimp
. . . . . . .
PLAN
CAPACITY
25 CU. FT.
M
. OUTLET
2 4-
04
PIPE
NOTE' PRECAST CB TYPE 2
SHALL BE PER WSDOT/APWA
I
STD. PLAN B-le, AND IS
VARIES
SHOWN HERE FOR REFERENCE
48", 54", 60",
ONLY - STD. PLAN SHALL
72" or 96"
CONTROL
SECTION—A--L
CATCH BASIN TYPE 2
SCALE: N.T.S.
n
1p
6"
_111111 I F1 I-M I I =111=111
SEC11ON B
PF=VFR.qF SLOPE CONCRETE DRIVEW
v %_ . —_ --- -
SCALE: N.T.S.
`- BRASS INLET
GRATE, 4`0
(SATIN FINISH)
BRASS INLET
GRATE, 4-0
PVC
COLLAR
NOTE: PA110 DRAINS SHALL
BE "NDS" 910B OR APPROVED
EQUAL
TYPICAL PATIO DRAIN
SCALE: N.T.S. 10
ASPHALT CLASS B
TYPICAL TYPICAL
NON -PAVED AREAS PAVED AREAS
FIN SH GRADE MATCH SURFACE TO SURROUNDING
FINISH SUW E.
SHORING BY CONTRACTOR DESIGN
ir-
cy
M ui
cn
U
-cc cn
M CL
ui
n
3:
9
U
cj
f
ACTUAL SIDE 0 0 0 1
SLOPE BY 0 0 -
0 0
0 0 c
CONTRACTOR '0' 0
0.. 2 cc
0 M1
0 _0 -
0 0
12" MAX
6" MIN., TREhCH WIDTH
(TYP CAL)
NOTE: I AS REQUIRED
1. CONTRACTOR SHALL MEET OSHA SAFETY STANDARDS FOR TRENCHING
INCLUDING STABLE SIDE SLOPE AIID/OR SHORING REQUIREMENTS.
LL IN ALL AREAS UNDER PAVEMENT
2. BACKFILL WITH STRUCTURAL F1 AX. DRY DENSITY.
VEHICLE AREAS, AND STRUCTURES. COMPACT TO 95% M
TYPICAL PIPE TRENCH
N.T.S.
FINISH GRADE
AT PAVEMENT EDGE
0 0 0
—o-
0 0;0 0 0 0 0 0 0 0
0 0 0
0 0 0 0
TE
CRUSHED AGGREGA
BASE COURSE
COMPACTED SUBGRADE
ECTION
ASPHALT PAVEMENT S
SCALE: N.T.S.
AY APPROACH
CONT. REVE
VARIES
MIN. TW ELEV.
314" CHAMFER
BAR A
BAR 8
MIRADRAIN GlOON WALL
DRAIN SYSTEM (OR
(BW ELEV-)
47:
APPROVED EQUAL)
2" WEEP HOLES 0
BAR c_\
C4
8'-O"O.C.
4
to
nj
BAR
Bf
CANTILEVER RETAJNING WALL SCHEDULE
Hw TW
Tf Bf
— —_
Bar *A7
Bar 'B" Bar "C' Bar 'D"
0 to r-0, go
go 2-6"
#4 0 18-
f4 0 12- J4 0 18- 4 J4
- __
- I
2'-1" to 4'-0" 1 8- 1
:: 1 1, ;:111111� -
10
___
14 0 1
#4 0 127-[��=4 #4
CONCRETE CANTILEVER (TOE) RETAINING WALL
N.T.S.
KEYED CONSTRUCTION JOINT
AND EXPANSION JOINT
LOCATED AT ALL GRADE
BREAKS AND 40' SPACING
MINIMUM.
A
ROOF
NTS
AND FILTER FABRIC INVERT
in BELOW BOTTOM OF FOOTING
(TYP)
TING DRAIN
. . ............... ... . . . . . . . . . . . . . . . . �A
55' CONC. SIDEWALK
On AT DWY)
1/2"
RADI
us
A
4" COMPACTED BASE A4
COURSE 95%
NOTE: CONCRETE SIDEWALKS SHALL BE CONSTRUCTED PER CITY OF EDMONDS
STANDARD DETAIL E2.13 - INFORMATION SHOWN HERE IS FOR REFERENCE ONLY.
CONCRETE SIDEWALK
SCALE: N.T.S. 8
CONCRETE PAVEMENT
SCALE: N.T.S.
MAX. SLOPE LINE
OF ROCK FACING
%NT
6" EXPOSED
AGGREGATE FINISH
WHERE INDICATED
18* COMPACTED DEPTH
STRUCTURAL FILL
12* COMPACTED
SUBGRADE, 90% MAX.
DRY DENSITY
SOIL
OCK FACINI
........... .... .
BACKFI ...... .... .... ....... . .. 6 (MAX) HEIGHT (H)
TING 0
EXIS R
MINERAL
.................................................. PROPOSED
. . . . . . . . . . . .
AGGREGATE
GR
. ........
ADE
" ...........
..........
DEPTH OF
BASE (D)
PROPOSED
SEC MAMA GRADE
TYPICAL ROCK FACING
SCALE: N.T.S.
A2
FACING HEIGHT
MINIMUM ROCK
(H)
(D)
§!?q8ASE) SIZE(
TTEET
3 INCHES
2-MAN 1 -MAN
4 FEET
6 INCHES
3-MAN 2-MAN
6 FEET
9 INCHES
4-MAN 2-MAN
8 FEET
12 INCHES
5 -MAN 2-MAN
Tnn AV
3/4- SQUARES 2
SPACED-3/4"
0 AS INDICATED
0 HT 1/8'
0 0 0
0 0 0
0 *0 4 3/4-
I-
12*0
FIBRE JOINT
1/8" RAISE/ PACKING
1/2' WIDE
BORDER
1/8 BEND
ion
9"
- 3147-
1/27-
Z 4" - _1 12w
Fi - -1 1/4
-7
7w 7/8
3/4"-
8w PIPE MATERIAL
150 1/8 BEND AS SPECIFIED.
CAST IRON RING
AND COVER*
. ..b. I ..
*NOTE: WITHIN PLUG TO BE
LANDSCAPED SEALED IN SAME
NATE **THIS DETAIL IS SHOWN HERE MAIN
AREASALTER MANNER AS MAIN
THREADED PVC FOR CONTRACTOR'S REFERENCE. SEWER JOINTS
LID MAY BE CLEANOUTS SHALL BE PER CITY
USED STANDARDS.
A
TYPICAL CLEANOUT
SCALE: N.T.S.
GARAGE
47 DOOR
GRATE PROPOSED SURFACE
2.0% 1/8- 2.0% FINISH
CONCRETE LIFT
ACOPRECAST POLYMER
4 CONCRETE TRENCH DRAIN
OR EQUAL
It CONCRETE
FOUNDATION
GRANULAR BASE
I'll I I Ed I 1E] I B...
COMPACT TO MIN.
95% OF MAX DENSITY
PER ASTM 1557
PAVEMENT CHANNEL DRAIN
N.T.S.
3:1 SAND AND CEMENT
GROUT 1" DEPTH 2 l/
NON -SHRINK
GROUT
#6
BARS (2) #3 BARS (2
80 IN
AITACHMENT DETAIL low
6'-0"
16" DIA HOLES
(TYP-)
WHEEL STOP---(:
N.T.S.
A2
0-d-
C-4
1:E1
113
cc 0
18
I
DIAMETER
CONCRETE
FOUNDATION
A2
TEEL PIPE 13OLLARD
S
SCALE: N.T.S.
BOLLARD 80 DIA.
GALV. SCHEDULE 40
STEEL PIPE FILLED
WITH CONCRETE
7
0
cn
<
W
C-)
a
U
0
U
0
Q
ui
C.D
<
C4
C
�Col
rC4
in
6
z
c_j
c
011,1)1111/ 1)
jjjj��� I_ FOR
CONSTRUCTION
0
A�j �-City Engineer 'fate
memo up-
on
1
00
on
" 0
;1
on"
Owl
OEM,
No
MENN
no
so
E g C9
:-;t
P
tn
W
P40
PIPW
z
0
SEPT. 20, 200
Sheet
%0 W"O�f 2 n
Sheet 1 of
EARTHWORK SPECIFICATIONS:
SEWER SERVICE NOTES:
CONCRETE PAVEMENT SPECIFICATIONS:
1. A GEOTECHNICAL REPORT WAS PREPARED FOR THIS PROJECT BY GEO GROUP NORTHWEST, INC., DATED MARCH 22, 2002. UNLESS OTHERWISE INDICATED
HEREIN, THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT SHALL BE CONSIDERED SPECIFICATION FOR WORK ON THIS PROJECT. IN THE EVENT OF
CONFLICT BETWEEN THE GEOTECHNICAL REPORT AND THIS SPECIFICATION, IMMEDIATELY NOTIFY THE OWNER, WHO WILL PROVIDE DIRECTION, AND UNTIL
OTHERWISE DIRECTED, BASE ALL PRICES AND BIDS THE MORE EXPENSIVE SPECIFICATION.
2. PROVIDE SHORING AND UNDERPINNING WHERE INDICATED AND/CIR REQUIRED. PERFORM UNDERPINNING AND SHORING OF EXISTING FOUNDATIONS SO AS TO
NOT DAMAGE OR COMPROMISE THE EXISTING FOUNDATION OR SUPPORT OF THE STRUCTURE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN,
SAFETY, AND EFFECTIVENESS OF ALL SHORING AND UNDERPINNING.
3. UNSATISFACTORY FILL MATERIAL - SOIL MATERIAL THAT CONTAINS ROOTS AND OTHER ORGANIC MATTER, TRASH, DEBRIS, AND FROZEN MATERIALS AND
STONES LARGER THAN 6 INCHES IN ANY DIMENSION; AND/OR MATERIALS CLASSIFIED IN ASTM D-2487 AS GM (DARK BROWN TO BLACK ORGANIC MATERIALS).
PT, OH AND OL; AND/OR MAN-MADE FILLS, REFUSE, OR BACKFILLS FROM PREVIOUS CONSTRUCTION; AND/OR MATERIALS THAT DO NOT MET THE SPECIFIED
REQUIREMENTS FOR THE INTENDED USE.
4."GENERAL FILL! SHALL BE NA11VE MATERIALS THAT DO NOT MET ANY OF THE RESTRICTIONS AS LISTED IN THE DEFINITION FOR UNSATISFACTORY
MATERIALS, AND ARE CAPABLE OF CONSOLIDATION AND COMPACTION SUFFICIENT TO PROVIDE A NON-SETTUNG FINISH GRADE IN EACH AREA OF INTENDED
USE. PLACE AND COMPACT GENERAL FILL IN CON11NUOUS LAYERS NOT EXCEEDING 12 INCHES IN LOOSE LIFT THICKNESS. COMPACT TO 90 PERCENT OF
MAXIMUM DENSITY AS DETERMINED BY ASTM D1557.
5. "STRUCTURAL FILL" SHALL BE IMPORTED OR NATIVE MATERIALS (IF NATIVE MATERIALS ARE TESTED AND MEET THE REQUIREMENTS OF STRUCTURAL FILL)
AND SHALL BE FREE OF UNSATISFACTORY MATERIALS AS SPECIFIED HEREIN, CONTAINING LESS THAN 5 PERCENT FINES (SOIL FRACTION PASSING THE NO. 200
SIEVE), AND WITH AN APPROVED OVER ALL GRADATION. IN THE EVENT THAT FILL MATERIALS DO NOT MEET THE SPECIFIED REQUIREMENTS THEY SHALL BE
REMOVED, REPLACED, AND RETESTED NTH NEW MATERIALS AT NO ADDITIONAL COST TO THE OWNER. PLACE AND COMPACT STRUCTURAL FILL IN CONTINUOUS
LAYERS NOT EXCEEDING 9 INCHES IN LOOSE LIFT THICKNESS. COMPACT TO 95 PERCENT OF MAXIMUM DENSITY AS DETERMINED BY ASTM D1557.
6. ON SITE SOILS ARE LIKELY TO BE SENSITIVE TO DEGRADATION DUE TO MOISTURE AND/OR IMPROPER EXPOSURE TO REPETITIVE CONSTRUCTION LOADS. THE
CONTRACTOR SHALL UTILIZE METHODS AND EQUIPMENT THAT MINIMIZE ADVERSE IMPACTS ON SUBGRADE. NOTE AND FOLLOW THE RECOMMENDATIONS IN THE
GEOTECHNICAL REPORT.
7. STOCKPILE SUBSOIL INTENDED FOR REUSE AS GENERAL FILL IN AREAS ON SITE AS DIRECTED BY THE OWNER. STOCKPILE SUBSOIL TO DEPTH NOT EXCEED
6 FEET. COVER TO PROTECT FROM EXCESSIVE MOISTURE AND EROSION. REMOVE EXCAVATED SUBSOIL NOT INTENDED FOR REUSE FROM SITE.
8. EXCAVATION CUT SHALL NOT INTERFERE WITH NORMAL 45 DEGREE BEARING SPLAY OF FOUNDATIONS. PROVIDE SHORING WHERE INDICATED AND/OR
OTHERWISE REQUIRED. UNDERPINNING OF EXISTING FOUNDATION WILL BE REQUIRED IN 9. ISOLATED LOCATIONS. SEE SPECIAL SHORING AND UNDERPINNING
REQUIREMENTS AS SPECIFIED IN PART I OF THIS SECTION.
10. PROTECT SUBGRADE FROM DETERIORATION DUE TO EXPOSURE TO MOISTURE, TRAFFIC, OR UNNECESSARY CONSTRUCTION LOADING. CAREFULLY, COMPACT
TOP LAYER OF SUBGRADE WITH HAND EQUIPMENT TO DENSITY REQUIREMENTS FOR SUBSEQUENT BACKFILL MATERIALS.
11. CUT OU I T SOFT AREAS OF SUBGRADE NOT CAPABLE OF INSITU COMPACTION. BACKFILL WITH STRUCTURAL FILL IN AREAS UNDER BUILDINGS, SLABS,
FOOTING, FOUNDATIONS AND PAVED AREAS. BACKFILL WITH GENERAL FILL IN AREAS TO BE NATURAL GRADED OR LANDSCAPED.
12. NATURAL GRADED AND LANDSCAPED AREAS MAY USE "GENERAL FILL" TO THE REQUIRED DEPTH. PLACE AND COMPACT AS SPECIFIED HEREIN.
13. AREAS SUPPORTING STRUCTURES, AND FOUNDATIONS SHALL BE BROUGHT TO GRADE WITH STRUCTURAL FILL TO THE REQUIRED DEPTH. SEE INDICATED
DETAILS FOR SPECIAL REQUIREMENTS AND MATERIALS. PLACE AND COMPACT PER RECOMMENDATIONS IN THE GEOTECHNICAL REPORT.
14. UNDER SLAB -ON -GRADE, UNLESS OTHERWISE INDICATED, PROVIDE 6 INCHES OF CAPILLARY WATER BARRIER MATERIAL COMPACTED TO THE SAME CRITERIA
AS SPECIFIED FOR STRUCTURAL FILL. DIRECTLY UNDER CONCRETE PROVIDE A VAPOR RETARDANT LINER.
15. SLOPE GRADE AWAY FROM BUILDING MINIMUM OF 2 INCHES IN 10 FT, UNLESS NOTED OTHERWISE.
16. REMOVE SURPLUS FILL MATERIALS FROM SITE.
STORM DRAINAGE SPECIFICATIONS:
1. EXCEPT WHERE A SPECIFIC PIPE MATERIAL IS INDICATED, AT THE CONTRACTORS OPTION, ONE OF THE FOLLOWING PIPE MATERIALS MAY BE SELECTED FOR
STORM DRAIN PIPING:
P . OLYVINYL CHLORIDE (PVC) PIPE: ANSI/ASTM D3034, TYPE PSM, SDR 35; INSIDE NOMINAL DIAMETER AS INDICATED; BELL AND SPIGOT STYLE RUBBER RING
SEAL GASKET JOINTS.
CORRUGATED POLYETHYLENE PIPE (CPEP): ("ADS" OR "HANCOR' OR APPROVED EQUAL) HIGH DENSITY CORRUCATED POLYETHYLENE DOUBLE WALL SMOOTH
INTERIOR PIPE CONFORMING TO ASTM F405 OR F667. POLYETHYLENE MATERIAL SHALL MEET THE REQUIREMENTS OF ASTM D 1248.
DUCTILE IRON PIPE: SHALL CONFORM TO AWWA C151 AND SHALL BE CEMENT -MORTAR LINED CONFORMING TO AWWA C104. UNLESS OTHERWISE INDICATED
PIPE SHALL BE MINIMUM THICKNESS CLASS 50. ALL DUCTILE IRON PIPE SHALL BE POLYETHYLENE ENCASED. DUCTILE IRON FITTINGS: SHALL BE RUBBER
GASKET PUSH -ON -JOINT (TYTON) OR MECHANICAL JOINT (M.J.) CONFORMING TO AWWA C111. METAL THICKNESS AND MANUFACTURING SHALL CONFORM TO
APPLICABLE PORTIONS OF AWWA C110. MECHANICAL JOINT, DUC11LE IRON, COMPACT FITTINGS 12 INCHES AND LESS SHALL BE IN ACCORDANCE WITH AWWA
C153. POLYETHYLENE ENCASEMENT- SHALL BE MINIMUM 8 MIL TUBE OR SHEET CONFORMING WITH AWWA C105.
2. DETENTION PIPE/TANK SYSTEM
STRUCTURAL STABILITY. TANKS SHALL BE CONTRACTOR DESIGNED (BY A WASHINGTON STATE PROFESSIONAL ENGINEER) AND SHOP FABRICATED AND SHALL
MET STRUCTURAL REQUIREMENTS FOR OVERBURDEN SUPPORT AND TRAFFIC LOADING IF APPROPRIATE. HS-20 LIVE LOADS MUST BE ACCOMMODATED FOR
TANKS LYING UNDER ROADWAYS OR PARKING AREAS. METAL TANK END PLATES MUST BE DESIGNED FOR STRUCTURAL STABILITY AT MAXIMUM HYDROSTATIC
LOADING CONDITIONS. FLAT END PLATES GENERALLY REQUIRE THICKER GAGE MATERIAL THAN THE PIPE AND/OR REQUIRE REINFORCING RIBS. TANKS SHALL
BE PLACED ON STABLE, WELL CONSOLIDATED NATIVE MATERIAL WITH A SUITABLE BEDDING.
PIPE TANKS: 4! DIAMETER AND UNDER SHALL BE CORRUGATED METAL PIPE (CMP) OR CORRUGATED HIGH DENSITY POLYETHYLENE PIPE (HDPE) AT
CONTRACTOR'S OPTION. OVER 4' DIAMETER SHALL BE CMP AS FOLLOWS:
CMP: CORRUGATED METAL PIPE SHALL BE GALVANIZED CORRUGATED STEEL, OR STEEL SPIRAL RIB PIPE WITH ASPHALT TREATMENT 1 OR BETTER, OR SHALL
BE CORROSION RESISTANT CORRUGATED ALUMINUM OR ALUMINUM SPIRAL RIB PIPE.
HDPE: HIGH DENSITY CORRUGATED POLYETHYLENE SMOOTH INTERIOR PIPE CONFORMING TO ASTM F405 OR F667. POLYETHYLENE MATERIAL SHALL MEET THE
REQUIREMENTS OF ASTM D 1248. NOTE: ALL SPECIAL BACKFILL SPECIFICATIONS RECOMMENDED BY THE MANUFACTURER FOR H20 TRAFFIC LOADING WILL BE
REQUIRED.
FLOW CONTROL "TEE": SHALL BE CORRUGATED METAL PIPE (CMP) AS SPECIFIED ABOVE. ORIFICE PLATES SHALL BE OF THE SAME MATERIAL AS THE TEE AND
SET HORIZONTALLY AND WELDED SECURELY WITH CONTINUOUS WATERTIGHT JOINT. ORIFICE HOLES SHALL BE SHOP DRILLED. STEEL TEE'S SHALL BE
COMPLETELY FABRICATED PRIOR TO GALVANIZING.
3. CATCH BASINS: SHALL BE OF THE SIZE AND TYPE INDICATED PER WSDOT/APWA STD PLAN AND SHALL BE CONSTRUCTED OF PRECAST CONCRETE UNITS,
METING THE REQUIREMENTS OF WSDOT/APWA 9-12.5.
4. AREA DRAINS: SHALL BE CONSTRUCTED FROM REINFORCED CONCRETE PIPE OF THE INDICATED DIAMETER, SAWCUT TO LENGTH, WITH BELL END UP. THE
GRATE SHALL BE SHOP FABRICATED, TRAFFIC RATED CAST IRON OF THE DIAMETER MATCHING THE BELL END OF THE PIPE. FIELD CAST CONCRETE BASE ON
PREPARED SUBGRADE WITH CLASS 3000 CONCRETE PER WSDOT/APWA STD. (ALTERNATIVE PRECAST UNITS OF EQUAL DIMENSION AND STRENGTH MAY BE
ACCEPTABLE, SUBJECT TO CATALOG CUT SUBMITTAL AND APPROVAL.)
5. FRAME AND GRATE: SHALL BE OF THE TYPE INDICATED; RATED FOR H20 LOADS MINIMUM; OF SHAPE AND MATERIALS MEETING REQUIREMENTS OF
WSDOT/APWA 9-05.15(2) METAL FRAME, GRATE AND SOLID METAL COVER FOR CATCH BASINS OR INLETS.
6. CLEANOUTS: PER WSDOT/APWA STD PLAN B-18B.
7. DETECTABLE MARKING TAPE: IN ACCORDANCE WITH WSDOT STD, PARAGRAPH 9-15.18.
8. FOOTING DRAINS: 4* MINIMUM DIAMETER PVC, ASTM D2729 NTH DRILLED OR SLOTTED PERFORATIONS WHERE INTENDED FOR COLLECTING GROUND WATER
AND SOLID WALL WHERE INTENDED FOR CONVEYANCE. SET FOOTING DRAINS AT 0.005 FT/FT MINIMUM SLOPE TO DRAIN AND CONNECT TO THE STORM DRAIN
SYSTEM (BYPASSING ANY TREATMENT AND/OR DETENTION SYSTEMS).
9. ROOF DRAIN EXTENSIONS: 4" MINIMUM DIAMETER PVC, ASTM D2729. SET ROOF DRAIN EXTENSIONS AT 0.005 FT/FT MINIMUM SLOPE TO DRAIN AND SHALL
BE CONNECTED TO THE STORM DRAIN SYSTEM AS INDICATED.
5. ROOF DRAIN DOWNSPOUT LEADERS ARE SHOWN TO PROVIDE SCHEMATIC LAYOUT. CONFIRM DOWNSPOUT LOCATIONS FROM ARCHITECTURAL ROOF PLAN.
FIELD COORDINATE AND ADJUST LAYOUT AS NECESSARY FOR CONNECTIONS OF DOWNSPOUTS TO LEADERS.
6. PAVEMENT TRENCH DRAINS: 7' WIDE CAST IRON ASSEMBLIES BY NEENAH, R-4995-8, TYPE M MEDIUM DUTY OR EQUIVALENT HEAVY DUTY, COMMERCIAL
POLYMER/POLYCAST UNITS BY ACO OR STRONGWELL, OR APPROVED EQUAL.
1. SANITARY SIDE SEWER BUILDING SERVICE PIPE SHALL BE PVC, ASTM D3034, SDR 35
2. COORDINATE INVERT ELEVATION AT THE POINT OF CONNECTION (BUILDING 2-FOOT LINE) WITH BUILDING MECHANICAL DESIGN AND INSTALLATION PRIOR TO
INSTALLING THE BUILDING CONNECTION. &
3. PROVIDE A CLEANOUT PER TYPICAL DETAIL AT THE POINT OF CONNEC11ON (BUILDING 5-FOOT LINE) AND ALL HORIZONTAL BENDS EXCEEDING 10 DEGREES.
4. SIDE SEWER BUILDING SERVICE PIPE SHALL BE INSTALLED AT 2% MINIMUM SLOPE UNLESS OTHERWISE INDICATED AND APPROVED BY THE PERMITTING
AGENCY.
5. UNLESS OTHERWISE INDICATED, CONNECT SIDE SEWER PIPE TO MAIN WITH MANUFACTURED "WYE" OR 0TEEw NTH A 45 DEGREE DROP TO THE MAIN.
6. ALL TRENCHING AND BACKFILL SHALL BY PER TYPICAL DETAIL
7. EXCEPT WHERE OTHERWISE INDICATED, RESTORE ALL FINISH SURFACES CUT AND REMMED FOR THE SIDE SEWER TRENCH TO MATCH EXISTING.
SERVICE WATER NOTES:
1. WATER SERVICE PIPE MATERIALS SHALL BE COPPER PIPE, SEAMLESS CONFORMING TO ASTM 888 (ANSI H33.1) TYPE W ANNEALED TUBING.
2. CORPORATION STOP SHALL BE BALL VALVE TYPE AND CONFORM TO AWWA STANDARD C800 WITH AWWA TAPERED THREAD (CC) INLET BY COMPRESSION
FITTING FOR COPPER OUTLET, COMPLETE WITH COUPLING NUT FOR COPPER SERVICE.
3. NOT USED.
4. PIPE BEDDING MATERIALS SHALL BE SAND OR FINE CRUSHED ROCK PER PIPE MANUFACTURER'S RECOMMENDATIONS.
5. INSTALL PIPE WITH 18-INCH MINIMUM COVER. COORDINATE PIPE LOCATIONS (HORIZONTAL AND VERTICAL) WITH OTHER UTILITY LINES AND SITE WORK.
FIELD ADJUST AS NECESSARY TO AVOID CONFUCTS,&
6. HAND TRIM EXCAVATIONS TO REQUIRED ELEVATIONS. CORRECT OVER EXCAVATIONVWITH COMPACTED STRUCTURAL FILL REMOVE LARGE STONES OR OTHER
HARD MATTER WHICH COULD DAMAGE PIPE OR IMPEDE CONSISTENT BACKFILUNG OR COMPACTION.
7. PRESSURE TESTING WILL BE PERFORMED IN ACCORDANCE WITH WSDOT/APWA AND KING COUNTY STANDARDS. TEST AND INSPECT PRIOR TO AND
IMMEDIATELY AFTER PLACING BEDDING. IF TESTS INDICATE WORK DOES NOT MEET REQUIREMENTS, REMOVEWORK, REPLACE AND RETEST AT NO COST TO THE
OWNER.
8. DISINFECTION SHALL BE IN ACCORDANCE WITH THE WSDOT/APWA AND KING COUNTY HEALTH DEPARTMENT STANDARDS.
9. DOMESTIC WATER SERVICE, INCLUDING METER SHALL BE INSTALLED BY CITY OF EDMONDS PUBLIC WORKS FROM TIIE MAIN TO THE PROPERTY LINE.
APPLICANT IS RESPONSIBLE FOR OBTAINING WATER SERVICE PERMIT AND CONNECTING MOM 'ME METER TO THE BUIWING.,&
ASPHALT PAVEMENT SPECIFICATION:
ASPHALT PAVEMENT
SUBMIT, FOR APPROVAL BY OWNER, PROPOSED MIX DESIGN OF EACH TYPE OF MIX AD THE RESULTS OF THE REQUIRED LABORATORY REVIEW PRIOR TO
COMMENCEMENT OF WORK. SUBMIT FOR APPROVAL PAVEMENT MARKING PAINT CATALOG CUTS, PRODUCT SPECIFICATION AND WARRANTY INFORMATION.
MATERIALS:
ASPHALT CEMENT. IN ACCORDANCE NTH WSDOT/APWA STD, PARAGRAPH 9-02.1(4) PAVING ASPHALT, VISCOSITY GRADE AR-4000W.
AGGREGATE OF MIX CLASS B WEARING COURSE: IN ACCORDANCE WITH WSDOT/APWA STD, PARAGRAPH 9-03.8 AGGREGATES FOR ASPHALT CONCRETE, CLASS
B (SEE ALSO AMENDMENT 14, JANUARY 1991).
AGGREGATE OF MIX CLASS G OVERLAY AND SHIM (WEARING COURSE): IN ACCORDANCE WTH WSDOT/APWA STD, PARAGRAPH 9-03.8 AGGREGATES FOR
ASPHALT CONCRETE, CLASS G.
TACK COAT: CATIONIC EMULSIFIED ASPHALT IN ACCORDANCE WITH WSDOT STD, PARAGRAPH 9-02.1(6) CATIONIC EMULSIFIED ASPHALT, CLASS CSS-1.
ASPHALT PAVING MIX: PROPORTIONS OF MATERIALS: SHALL BE IN AdCORDANCE WITII -WSDOT STD, PARAGRAPH 9-03.8(6) PROPORTIONS OF MATERIALS.
PAVEMENT MARKING PAINT. SHALL BE OIL BASED ALKYD OR CHLORINATED RUBBER BASE PAINT SPECIFICALLY FORMULATED FOR TRAFFIC WEAR AND
APPLICA11ON TO ASPHALT SURFACES. IT SHALL BE FACTORY MIXED, QUICK DRYING AND NON-BI FEDING, MEETING FEDERAL SPECIFICATION TT-P-115C, TYPE
111, OR APPROVED EQUAL COLOR: AS INDICATED OR SPECIFIED.
PLACING ASPHALT PAVEMENT:
DO NOT PLACE ASPHALT WHEN BASE SURFACE TEMPERATURE 15 LESS THAN 40 DEGREES F, OR SURFACE IS WET OR FROZEN.
EQUIPMENT FOR PAVING SHALL BE SPREADING, SELF-PROPELLED, ASPHALT PAVING MACH14E OR MACHINES CAPABLE OF MAINTAINING LINE, GRADE, AND
MINIMUM COURSE THICKNESS AS INDICATED. A SPREADER BOX OR MANUAL METHODS MAY BE USED IN AREAS NOT ACCESSIBLE TO THE MACHINE.
INSTALL WORK IN ACCORDANCE WITH WSDOT STD, PARAGRAPH 5-04.3 (9,10411) SPREADING AND FINISHING, COMPACTION, CONTROL AND JOINTS. PLACE
ASPHALT WITHIN 24 HOURS OF APPLYING PRIMER OR TACK COAT. PLACE AND COMPACT TO INDICATED THICKNESS. COMPACT PAVEMENT BY ROLLING. DO
NOT DISPLACE OR EXTRUDE PAVEMENT FROM POSITION. HAND COMPACT IN AREAS INACCESSIBLE TO ROLLING EQUIPMENT. DEVELOP ROLLING WITH
CONSECUTIVE PASSES TO ACHIEVE EVEN AND SMOOTH FINISH, WITHOUT ROLLER MARKS. SET UP ROLLING PATTERN TO ACHIEVE OPTIMUM COMPACTION OF
PAVEMENT.
PAVEMENT PATCHING/RESTORATION
REMOVE PAVEMENT SECTIONS IN STREETS AS REQUIRED TO PROVIDE ACCESS FOR CONNECTIONS TO OR EXTENSIONS OF UNDERGROUND UTILITIES AND FOR
PAVEMENT MODIFICATIONS AND SITE FEATURE INSTALLATIONS. PERFORM ALL WORK NECESSARY TO COMPLETE THE UNDERGROUND UTILITY AND SITE FEATURE
INSTALLATION. REPLACE STREET CUT PAVEMENT SEC11ONS WITH THE PAVEMENT RESTORATION SEC11ON AS INDICATED. REPLACEMENT SECTIONS OF CURBS,
GUTTERS, SIDEWALKS, AND DRIVEWAYS NOT OTHERWISE DETAILED OR DESCRIBED IN -NE CONTRACT DOCUMENTS SHALL BE CONSTRUCTED NTH APPROVED
MATERIALS TO MATCH LINES AND GRADES OF EXISTING IMPROVEMENTS.
TOLERANCES
PLACE PAVEMENT SO THAT FINISH GRADE IS TO UNIFORM SLOPES AND ELEVATIONS AS SHOWN AND SO THAT SURFACE DRAINAGE IS DIRECTED TO THE
INDICATED STORM DRAIN SYSTEM. PROVIDE FINISH SURFACE TO THE SPECIFIED TOLERANCES, AND SUCH THAT NO PONDING SHALL OCCUR.
FLATNESS: MAXIMUM VARIATION OF 1/4 INCH MEASURED NTH 10 FOOT STRAIGHT EDGE.
SCHEDULED COMPACTED THICKNESS- WITHIN 1/4 INCH.
VARIATION FROM TRUE ELEVATION: WITHIN 0.04 FT.
ALL SURFACES SHALL SLOPE TO DRAIN AS INDICATED.
FIELD QUALITY CONTROL
COMPACTION: WSDOT 705&715 1 PER EACH 2000 SY
TEMPERATURE: 1 PER EACH DELIVERY
IF TESTS INDICATE WORK DOES NOT MEET SPECIFIED REQUIREMENTS, REMOVE WORK, REPLACE AND RETEST AT NO COST TO OWNER.
CLEANING AND PROTECTION:
AFTER COMPLETION OF PAVING OPERATIONS, CLEAN SURFACES OF EXCESS OR SPILLED ASPHALT MATERIALS TO THE SATISFACTION OF THE OWNER. AFTER
FINAL ROLLING, DO NOT PERMIT VEHICULAR TRAFFIC ON ASPHALT CONCRETE PAVEMENT UNTIL IT HAS COOLED AND HARDENED, AND IN NO CASE SOONER
THAN 24 HOURS. PROVIDE BARRICADES AND WARNING DEVICES AS REQUIRED TO PROTECT PAVEMENT AND THE PUBLIC. COVER OPENINGS OF STRUCTURES IN
THE AREA OF PAVING UN11L PERMANENT COVERINGS ARE PLACED.
PREPARATION FOR PAVEMENT
SURFACE CONDITIONS: PRIOR TO ALL WORK OF THIS SEC11ON CAREFULLY INSPECT THE SURFACES TO WHICH ASPHALT CONCRETE PAVEMENT WILL BE APPLIED
AND VERIFY THAT ALL WORK OF OTHER TRADES IS SUFFICIENTLY COMPLETE TO ALLOW THIS INSTALLATION TO COMMENCE. VERIFY THAT ALL GRADING HAS
BEEN PERFORMED TO THE TOLERANCES REQUIRED AND THAT THE PAVEMENT INSTALLATIM WILL PRODUCE SURFACES OF T'HE DESIGNED SLOPE AND PATTERN.
VERIFY THAT BASE IS GRADED SUCH THAT FINISH PAVEMENT SURFACE WILL DRAIN TO INDICATED DRAINAGE FEATURES, AND THAT NO PONDING WILL OCCUR.
VERIFY THAT COMPACTED GRANULAR BASE IS DRY AND READY TO SUPPORT PAVING AND IMPOSED LOADS. IN THE EVENT OF DISCREPANCY, NOTIFY THE
OMER AND PROCEED AS DIRECTED.
ADJUST UTILITY STRUCTURES TO GRADE: ADJUST ALL FRAMES, RIMS, GRATES, LIDS, COVERS, ETC. OF UTILITIES TO FINISH GRADE IN ACCORDANCE WITH
WSDOT/APWA STD, PARAGRAPH 7-05.3(l) ADJUSTING MANHOLES AND CATCH BASINS TO GRADE. INSTALL ALL NEW CATCH BASIN AND MANHOLE FRAMES IN
CORRECT POS111ON AND ELEVATION.
EXISTING ASPHALT SURFACES: SHALL BE PREPARED AND TACK COATED IN ACCORDANCE WITH WSDOT STD, PARAGRAPH 5-04.3(5)A, PREPARAT10N OF
EXISTING SURFACES. APPLY TACK COAT TO CONTACT SURFACES OF CURBS, GUTTERS, AND ABUTTING CONCRETE SURFACES.
COAT SURFACES OF MANHOLE AND CATCH BASIN FRAMES WITH OIL TO PREVENT BOND MTH ASPHALT PAVEMENT. DO NOT TACK COAT THESE SURFACES.
CONCRETE PAVEMENT
PRODUCTS:
CONCRETE MATERIALS SHALL BE IN ACCORDANCE WITH WSDOT/APWA STD, PARAGRAPH 5-05.2 MATERIALS.
CEMENT. PER WSDOT/APWA STD, PARAGRAPH 9-01.2(l) TYPE 11 PORTLAND CEMENT.
AGGREGATE: PER WSDOT/APWA STD, PARAGRAPH 9-03.1 AGGREGATES FOR PORTLAND CEMENT CONCRETE.
CONCRETE MIX: CONCRETE MIX DESIGN SHALL BE STANDARD 14-DAY MIX AS SPECIFIED IN WSDOT/APWA STD, PARAGRAPH 5-05.3(l) PROPORTIONING OF
MATERIALS
AIR CONTENT. 5.0% TOLERANCE OF 1.5%
STRENGTH: MINIMUM FLEXURAL STRENGTH OF 650 POUNDS PER SQUARE INCH AT 14 DAYS.
ADMIXTURES: AS SPECIFIED IN WSDOT/APWA STD, PARAGRAPH 9-23.6 ADMIXTURES FOR CONCRETE. NO CALCIUM CHLORIDE WILL BE PERMITTED.
- I
REINFORCING STEEL SHALL BE IN ACCORDANCE WITH WSDOT/APWA STD, SECTION 9-07 REINFORCING' �TOEL WIRE MESH: AASHTO M 55, WELDED STEEL
WIRE FABRIC FOR CONCRETE REINFORCEMENT OF SIZE AND GAUGE AS INDICATED.
FORMED CONTRACTION JOINTS: WSDOT/APWA STD, PARAGRAPH 9-04.1(1) ASPHALT FILLER FORtONTRACTION AND LONGITUDINAL JOINTS IN CONCRETE
PAVEMENT. FORMED EXPANSION JOINTS: AASHTO M 213, PREFORMED EXPANSION JOINT nLLER9 FOR CONCRETE PAVING AND STRUCTURAL CONSTRUCTION.
SAWED CONTRACTION JOINTS: ASTM D 1850 COLD APPLICATION OR AASHTO M 173, CONCRETE JOINT SEALER, HOT POURED ELASTIC TYPE.
EXECUTION:
UNLESS OTHERWISE APPROVED BY THE OWNER, CONCRETE PLACEMENT SHALL BE DISCONTINUED WHEN AIR TEMPERATURE REACHES 40 DEGREES F AND IS
FALLING. PLACEMENT MAY BEGIN WHEN AIR TEMPERATURE REACHES 35 DEGREES AND IS RISING. IN NO CASE SHALL CONCRETE BE PLACED WHEN BASE
SURFACE IS WET OR FROZEN. CONCRETE PLACEMENT SHALL BE DISCONTINUED WHEN AIR TEMPERATURE REACHES 85 DEGREES F AND IS RISING.
PLACEMENT MAY BEGIN WHEN AIR TEMPERATURE REACHES 90 DEGREES AND IS FALLING. IN ALL CASES THE TEMPERATURE OF THE CONCRETE AS PLACED
SHALL NOT EXCEED 85 DEGREES F EXCEPT WHERE AN APPROVED RETARDER IS USED.
FORMING, PLACING, FORMING OF JOINTS, COMPACTING, FINISHING, AND CURING SHALL BE DONE IN ACCORDANCE WITH WSDOT/APWA STD SECTION 5-05.3
EXCEPT AS MODIFIED HERON. THE SPECIAL PROVISIONS HEREIN COVER CONVENTIONAL CONCRETE FORMING AND PLACING METHODS. WHERE SUP -FORM
METHODS ARE PROPOSED BY THE CONTRACTOR, EQUIPMENT, INSTALLATION METHODS, AND QUALITY CONTROL METHODS SHALL BE SUBMITTED TO THE OWNER
FOR REVIEW AND APPROVAL
FORMS SHALL BE CAREFULLY SET TO THE INDICATED ALIGNMENT, GRADE, AND DIMENSIONS. FORMS SHALL BE HELD RIGIDLY IN PLACE. CLAMPS, SPREADERS,
AND BRACES SHALL BE USED WHERE REQUIRED TO INSURE RIGIDITY OF FORMS. FORMS SHALL BE THOROUGHLY CLEANED AND COATED WITH FORM OIL FOR
EACH USE. SIDEWALK FORMS SHALL BE OF A HEIGHT EQUAL TO THE FULL DEPTH OF THE FINISHED SIDEWALK. FORMS SHALL BE SET WITH UPPER EDGE
TRUE TO LINE AND GRADE WITH AN ALLOWABLE TOLERANCE OF 1/8 INCH IN ANY 10-FOOT LONG SECTION. FORMS SHALL HAVE A TRANSVERSE SLOPE OF
1/4 INCH PER FOOT IN THE DIRECIION OF INTENDED DRAINAGE. CURB FORMS SHALL BE OF A HEIGHT EQUAL TO THE FULL DEPTH OF THE FINISHED CURB .
FORMS SHALL BE SET WITH UPPER EDGE TRUE TO LINE AND GRADE WITH AN ALLOWABLE TOLERANCE OF 1/8 INCH IN ANY 10 FOOT LONG SECTION. FORMS
SHALL HAVE A TRANSVERSE SLOPE TO MATCH THAT OF THE INDICATED SECTION (OR OF 1/4 INCH PER FOOT TOWARDS THE ROADWAY WHERE NOT
INDICATED). THE PAVEMENT DEPTH AND SUBGRADE FOR FORMED SIDEWALKS, CURBS, AND GUTTERS SHALL BE TESTED FOR GRADE AND CROSS SECTION WITH
A TEMPLATE EXTENDING THE FULL WIDTH OF THE SECTION AND SUPPORTED BETWEEN SIDE FORMS. DRIVE ACCESS PAVEMENT SHALL BE TESTED BY
MEASURING FROM TAUGHT STRING LINE FROM BATTER BOARD TO BATTER BOARD ON EACH SIDE OF PAVEMENT SECTION AT 10 FOOT SPACING ALONG THE
DRIVE AUGNMENT.
REINFORCEMENT STEEL SHALL BE ACCURATELY AND SECURELY FASTENED IN PLACE WITH SUITABLE SUPPORTS AND TIES BEFORE CONCRETE IS PLACED.
I
THE CONCRETE SHALL BE PLACED WITHIN 45 MINUTES FROM THE 11ME ALL INGREDIENTS ARE CHARGED INTO THE MIXING DRUM AND BEFORE THE CONCRETE
HAS ATTAINED ITS INITIAL SET. THE PLACING OF CONCRETE SHALL NOT BE PERMITTED MEN, IN THE OPINION OF THE OWNER, THE ENVIRONMENTAL CRITERIA
AS SPECIFIED HEREIN OR LIMITATIONS OF FACILITIES PROVIDED BY THE CONTRACTOR PREVENTS PROPER PLACEMENT AND FINISHING. THE APPROPRIATE USE
OF A WATER -REDUCING RETARDER IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS WILL BE PERMITTED ONLY AFTER APPROVAL WORKMEN
SHALL NOT BE PERMITTED TO WALK IN THE CONCRETE DURING PLACING AND FINISHING OPERATIONS WITH EARTH OR FOREIGN MATERIAL ON THEIR FOOTWEAR .
SIDEWALK JOINTS SHALL BE CONSTRUCTED TO DIVIDE THE SURFACE INTO RECTANGULAR AREAS. TRANSVERSE CONTRACTION JOINTS SHALL BE SPACED EQUAL
TO THE SIDEWALK WIDTH OR 5 FEET ON CENTERS, WHICHEVER IS LESS, AND SHALL BE CONTINUOUS ACROSS THE SLAB. TRANSVERSE EXPANSION JOINTS
SHALL BE INSTALLED AT SIDEWALK RETURNS, AND WHERE INDICATED. EXPANSION JOINTS SHALL BE FORMED ABOUT STRUCTURES AND FEATURES WHICH
PROJECT THROUGH OR INTO SIDEWALK PAVEMENT, USING PREMOLDED JOINT FILLER. CONTRACTION JOINTS SHALL BE FORMED IN FRESH CONCRETE OR SAWN'
IN HARDENED CONCRETE TO A DEPTH OF 1/4 THE SLAB THICKNESS, AND FILLED NTH THE APPROPRIATE JOINT FILLER/SEALANT.
CURB AND GUTTER JOINTS SHALL BE CONSTRUCTED AT RIG! IT ANGLES TO THE LINE OF CURB AND GUTTER. CONTRACTION JOINTS SHALL BE CONSTRUCTED
DIRECTLY OPPOSITE CONTRACTION JOINTS IN ABUTTING PORILAND CEMENT CONCRETE PAVEMENTS AND SPACED SO THAT MONOLITHIC SECTIONS BETWEEN CURB
RETURNS WILL NOT BE LESS THAN 5 FEET NOR GREATER THAN 10 FEET IN LENGTH. EXPANSION JOINTS SHALL BE FORMED BY MEANS OF PREFORMED
EXPANSION JOINT F11 I ER MATERIAL CUT AND SHAPED TO -THE CROSS SECTION OF CURB AND GUTTER. EXPANSION JOINTS SHALL BE PROVIDED IN CURB AND
GUTTER DIRECTLY OPPOSITE EXPANSION JOINTS OF ABUTTING PORTLAND CEMENT CONCRETE PAVEMENT, AND SHALL BE OF THE SAME TYPE AND THICKNESS
AS JOINTS IN THE PAVEMENT. WHERE CURB AND GUTTER 00 NOT ABUT PORTLAND CEMENT CONCRETE PAVEMENT, EXPANSION JOINTS AT LEAST 3/8 INCH IN
WIDTH SHALL BE PROVIDED AT INTERVALS NOT EXCEEDING 10 FEET. & &
CONTRACTION JOINTS SHALL BE FORMED IN FRESH CONCRETE. JOINTS SHALL NOT BE SAWN IN NOR JOINT FILLER PLACED IN CONCRETE WITHIN THE CITY
RIGHT-OF-WAY
FINISHING:
SIDEWALK SPECIAL CONSIDERATIONS: ALL SLAB EDGES, INCLUDING THOSE AT FORMED JOINTS, SHALL BE FINISHED CAREFULLY WITH AN EDGER HAVING A
RADIUS OF 1/8 INCH. FINAL FINISH SHALL BE A SCORED SURFACE PRODUCED BY BROOMING WITH A FIBER -BRISTLE BRUSH IN A DIRECTION TRANSVERSE TO
THAT OF TRAFFIC.
CURB AND GUTTER SPECIAL CONSIDERATIONS: EXPOSED SURFACES SHALL BE FLOATED AND FINISHED TO GRADE AND SECTION AND UNIFORM IN TEXTURE.
THE EDGES OF THE GUTTER AND TOP OF THE CURB SHALL BE ROUNDED WITH AN EDGING TOOL TO A RADIUS OF 1/2 INCH. ALL EXPOSED SURFACES SHALL
BE FLOATED AND/OR RUBBED WITH A WOOD OR CONCRETE RUBBING BLOCK TO A SMOOTH SURFACE AND THEN BRUSHED WITH AnNE-HAIR BRUSH NTH
LONGITUDINAL STROKES.
DRIVE ACCESS PAVEMENT SPECIAL CONSIDERATIONS: ALL SLAB EDGES, INCLUDING THOSE AT FORMED JOINTS, SHALL BE FINISHED CAREFULLY WITH AN EDGER
HAVING A RADIUS OF 1/8 INCH. THE SURFACE SHALL BE FINISHED TO A SMOOTH AND UNIFORM FINE GRANULAR TEXTURE, FREE FROM WAVES,
IRREGULARITIES, OR TOOL MARKS. FINALnNISH SHALL BE A SCORED SURFACE PRODUCED BY PRECISE DRAWING OF A STEEL DOWEL RAKE IN A DIRECTION
TRANSVERSE TO THAT OF TRAFFIC.
CURING AND PROTECTION:
CONCRETE SHALL BE PROTECTED AGAINST LOSS OF MOISTURE AND RAPID TEMPERATURE CHANGES FOR AT LEAST 7 DAYS FROM THE BEGINNING OF THE
CURING OPERATION. UNHARDENED CONCRETE SHALL BE PROTECTED FROM RAIN AND FLOWING WATER. ALL EQUIPMENT NEEDED FOR ADEQUATE CURING AND
PROTECTION OF CONCRETE SHALL BE ON HAND AND READY FOR USE BEFORE ACTUAL CONCRETE PLACEMENT BEGINS. PROTECT PORTLAND CEMENT
CONCRETE FROM TRAFFIC FOR A MINIMUM OF 7 DAYS OR UNTIL A FLEXURAL STRENGTH OF 450 POUNDS PER SQUARE INCH HAS BEEN ATTAINED.
TOLERANCES IN PAVEMENT THICKNESS AND SURFACE TESTS:
ALL PAVEMENT AREAS, DEFICIENT IN SLAB THICKNESS BY 1/2- OR MORE, SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR WITH PAVEMENT OF
SPECIFIED THICKNESS AT NO ADDITIONAL COST TO THE OWNER. I
SURFACE SMOOTHNESS AND IRREGULARITIES WILL BE TESTED AS NECESSARY WITH A 10-FOOT STRAIGHTEDGE. ANY DEVIATION OF MORE THAN 1/8- IN ANY
DIRECTION WILL BE CONSIDERED SUBSTANDARD INSTALLATION AND MAY BE REJECTED. THE SURFACES BETWEEN JOINTS OF ADJACENT SLABS NOT VARY FROM
THE STRAIGHTEDGE BY MORE THAN 1/4".
FIELD QUALITY CONTROL
CONCRETE SAMPLES SHALL BE TAKEN IN THE FIELD IN ACCORDANCE WITH ASTM C 31 TO DETERMINE THE ADEQUACY OF CONTROL OF MATERIALS,
PROPORTIONING, CONSISTENCY, MIXING AND AIR CONTENT. TEST CYLINDER WILL BE MADE FOR DETERMINING CONFORMANCE WITH THE STRENGTH
REQUIREMENTS AND, WHEN REQUIRED, FOR DETERMINING THE TIME AT MICH PAVEMENTS MAY BE PLACED IN SERVICE. ALL SAMPLING PREPARATION OF
SPECIMENS AND TESTING OF FRESH CONCRETE AND HARDENED CYLINDERS WILL BE PERFORMED BY THE TESTING LABORATORY. MAKE TWO TESTS FOR EACH
DAYS POUR. TAKE 3 CYLINDERS PER TEST. FORWARD TEST RESULTS TO OWNER. STANDARD TEST CYLINDER WILL BE TESTED IN CONFORMANCE NTH ASTM
STANDARD C 496.
THE SWMP OF CONCRETE SAMPLE FOR EACH STRENGTH TEST AND WHEREVER CONSISTENCY OF CONCRETE APPEARS TO VARY SHALL BE DETERM%"ED By 'W
METHOD OF ASTM STANDARD C 143. THE AIR CONTENT OF THE CONCRETE SHALL BE DETERMINED ON A REGULAR AND FREQUENT BASIS BY OTHER METHOD
OF ASTM STANDARDS C 173 OR C 231. THE TEMPERATURE OF THE CONCRETE AS PLACED SHALL BE DETERMINED WHENEVER IT IS SUSPECTED OF NEARING
SPECIFICATION LIMITS.
: , . " ." 0
APPROVEDFOR
CONSTRUCTION
0AZO L
Aj3 City Engineer Date
z
0
fn
5:
w
ce
(n
0
z
z
w
LLJ
0
0
0
0
0
0
z
z
w
w
0
0
04
C*4
00
LAJ
mi
Do
I
mic
C'4 0-
Kow., "g-Dil
No i""
M
Ilon
ON!
11100
11
1111
lam',
on
N d4mmusiff
low,,
Ono
Now
�111,
now
one
In,
mommomm,
momm-0
0
.
...
MOM
w
w
0
0 Wz
ko
JUNE 26, 2002
Sheet
w"4k3m-A
uo I
Sheet 1 of 1
.8
Z_;
EX- ACER RUBRUM
EX. PIERIS JAPONICA
EX -.PftR-lSJAP0NfCA
EX. PIERIS JAPONICA
70 JBETRANSPLANTED #I
EX. PtWLIS -SP- TO BF- REMOVE DA.
iEX. F'JERYSJA- PONICA,
TO BE TRA iqSPLANTE:D #2
EX, ACER TO BE R
EMOVED—
DAYTON STREET
DAYTON
CONDOMINIUMS
...............
ALLEY
EX. TREE AND SHRUB DIAGRAM (NTS) NORTH
NOTE: ALL PLANT MATERIAL ON SITE NOT
INCLUDED IN THIS DIAGRAM IS TO BE REMOVED.
m w — f-m- ! � � To I A 1=1= -7 Z. 041al 0 w-7 Z=—M� = - p A 4, VY1, X'Wm— W, & % 4-\� � M
EAST SECTION /ELEVATION
SCALE: 3/16 1 0
ALLEY
TRANSPLANTED Al
Ex. PIE
HELLEBORUS ORIENT,
RAISED STONE PLAN
ALER PALMATUM'BLOODG(
SARcbCOCCA RUSCIF
HELLEBORUS ORIENI
CONCRETE RETAININGv
PROPERTY I
6.'CEDAR FEI
36" H. BOLLARD LIG
COTULA SQUAL
PLANTING PLAN NOR
SCAJ.Ei*l 1 /8 0
EUPHORBIA CHARACIAS WULF
.f?.ENNISETUM ALOPECURO0
CONCRE:TE TRANSFORMER
7L
WIN
wim
4,
01-
`-ISPLANTED ACER
NSPLANTED PIERIS #2
YRIUM NIPPONICUM
CINIUM OVATUM
LBE X ARENDS11 'BRIDAL VEIL'
CIN ATUM
rl M POLYBLEPHARUM
&DAktFENCE
I 0,EGYNRIS NOOTKANENSIS'PENDULA'
--i7NUM SPICAN
-E NOTES:
LANDSCAP
0. SPACING OF ALL PLANTS IS TO BE AS SHOWN
OALL BEDS ARE TO BE EXCAVATED A MINIMUM DEPTH OF
CIRCINATUM 101,
0
OALL BEDS TO RECEIVE A MINIMUM 6-8" OF WELL
D�RAINED, COMPOST -RICH TOPSOIL ON TOP OF THE
AMENDED SUBGRADE
IAECYPARIS "AMEND SOIL WITH PEAT MOSS AROUND EACH FERN,
OOTKANENSIS'PENDULA' EVERGREEN PERENNIAL,, AND SHRUB AS THEY ARE
PLANTED
'GROUND COVER (WILD GINGER) IS TO BE PLANTED 1'
O.C. IN ALL BED SPACE NOT OCCUPIED BY OTHER
PLANTS.
000TULASQUALIDA TO BE PLANTED IN PART TO FUL-..L
CIRCINATUM zc".)UN PLA11TING BEDS l'O. C' , AND ASAURIA. CAUI"*)ATUM
T'() BEPLANTED l'O.C. IN PART TO FULL SHADE BEDS.
3TACK STONE RETAINER "AL.L. BEDSTO BE MULCHED W1 I " LAYER OF GROCO
3PLANTED PIERIS # I (FROM SAWDUST SUPPLY) OR A COMPARABLE
COMPOST MULCH UPON COMPLETION OF PLANTING
3 JAPONICA'CAVATINE'.
TINUS'ROBUSTUM' bAYTON STREET CONDOMINIUMS PLANTING SC14EDULE
TOTRICHON
4PERVIRENS 3
2
2
�H ENCLOSURE
6
. .........
In
loz
BOTANICALNAME
COMMON NAME
SIZE
-TREES
6' MIN. HT.
ACER CIRCINkTUM
VINE MAPLE
ACER PALMP:FUM
'BLOODGOOD'
JAPANESE MAPLE
+'MIN. HT.
CHAMAECYPARIS
NOOTKANENSIS'PENDULA'
WEEPING ALASKA CEDAR
&'MIN. HT.
CHAMAECYPARIS OBTUSA
HINOKI CYPRESS
5'MIN. HT.
SHRUBS�
PIERIS JAPONICA'CAVATINE'
LILY -OF -THE -VALLEY SHRUB
-SARCOCOCCk RUSCIFOLIA
SWEET BOX
GALLON POTS
-VACCINIUM OVATUM
EVERGREEN HUCKLEBERRY
GALLoW �,o-7s
VIBURNUM TIIQUS'RoBusTum'
ROUNDLEAF LAURUSTINUS
(;ALLO�J POT-5
FERNS
ATHYRIUM NIPPONICUM
JAPANESE PAINTED FERN
GALLON POTS
BLECHNUM SPICANT
DEER FERN
GALLON POTS
POLYSTICHUM
POLYBLEPHA,RUM
TASSEL FERN
GALLON POTS
PERENNIALS
AsTILBE X ARENDSII 'BRIDAL
VEIL'
FALSE SPIRAEA
GAL-LON.POTS
ELIPHORBIA (,HARACIAS
WULFENII
EUPHORBIA
CALLON POTS
HELLEBORU-c 6RIENTALIS
LENTEN ROSE
GALLON POTS
ORNAMENTNL GRASSES
HELICTOTRICH,ON
SEMPERVIRENS
BLUE OAT GRASS
I GALLON POTS
PENNISETUM ALOPECUROIDEs
FOUNTAIN GRASS
GALLON POTS
GROUND COVERS
ASARUM CAUDATUM
ILD GINGER
4"POTS
COTULA SQLl-%LIDA
BRASS BUTT70NS
4"PoTs
FlLt
fSorlRtt I
APPR00E-D RECEEIvEr)
MAR 0 12005
PERMIT COUNTER
.06
b)
0
z
z
5
L0
z
(L
. .
z
z
0
uj
W
10
elm
D
z
z
0
Z
LLJ
Lij
(L
W
U) l<
z �:
ZO
o(d
<z
00
CD 2
IQ
Lo Uj
z
0
0
z
Ld
0)
cb
z
C\l
C\l
co M
LLI
r)
o Ld
IL
I
CL
<
-z
�- 0 0
LLI 0
U)
0 m
It
Z 0
z
LIJ
cn J
00 -ui
APRIL l 4,2002
MARCH 3, 2002
MAY 19,2002
,AUGUST 22,2Q02
L
0
RECEIVED
MAR 10 2005
PERMIT COUNTER
mW�TMICTION NOTES:
(.'.,B TYPE I
R I 1%A 9 1 ; 6 6
I E 8 8.3 3
S D
SD S
00
s 5,
A PIPE CRO'NW A
"ASE BOT. SD 91.0
V_FIR N U LA NT 111 C CROWN E
X. 8* W 90.6*
1 - 12"Af0m TEE (FL) (*SEE SHT. NOTE 1) N 9
2 - 12' RESLIENT'GATE VALE 111, 1111 J 11
I - 4w RESILIENT GATE VALVE (FLxM,I),
2 - 12 0 PI.-7SPOOL,T? IT r_1 ��.UPLLM 10
R N E
(SEE SHT) NO
& - TY * T T
.. . ...... ........ 7 �i
N 0 f Y11
5 LF 6" SD
0 O�20ft
-1 .=
F- 0 U N D REBAR (k CAP - LS 4F-v
0, -,Q9 TYPE 1 4. .
[AST A
9 -17 0.1 j
S)
"OU11-1 OF C'0 R N E R 111-42,00-(6',
IE 91-90 E
777< ER, 19
NOTE: A FIRE IlYDRANT IS LOCATE96)'
120' WESIV OF' TFIE NORT11WIST
PIV
C 0 R'N E R OF" THIS FIROPERTY ALONG 7 3
C V,
DAYTON "-'j - f R [ U" 12
AA22
C13 TYPE 2-48- W/ SOLID LID
BUILD OVER EXISTING LINE) —
RIM 95.00 (MATCH EXIST.) A
IE 90.86 (CALC'd EXIST.)
IE (8-, S) 91.05 (MATCH EXIST. SPRING LINES)
A 7V Sr/771--_�i,EET
6
tT6 R1 Y
pipf - 1COS G DP)
'0(
BOT. SD 91.0 T C11 -,t��)!)AEIIAT�MNWW-\M 11
A
—SE SHTA
4
NOTE 6
0, 0 12 E
T
4, _C, )(Y
f
SD OTEEN
-TIE
w-r
9, 7 2'
97)
.(D2
T.
FENCE CORNER
0
0.5' INESI' OF LINE
(f
0
4
6'
(Nj
w
0
4 1
A
SD
w
O.wt/ft
0 w
0 7
00
0
z
A
NDSCAPE
9.70
tA
I . .
�'R M 9.00
4
CONCRETE
WIRE FENCE -
END OF FENCE
ri ?, Wr(IT F I INIF
El
CIAS VALVE_____
FOUND REBAF� CAP -- ---- - � C -
1 1-13 9'17� 0,391 ["AST & c�
0.071 NORT11 01' CORNER
PF-
0,++4---,-
.1 T 9 2-
Q)
B A Sl N
CAT(.., Z)
RIM -= 103,59
I-+1' IN (`A.*?.-*
IE 91.30 (30".
IE-11.3048", ,
. fivi
fl)
CA cl
��,Z�Q,47 8
: F I j
9
PIPE CROSSING A PROJECI 8EN(..*11MARI`( "K NAIL. ANE
ROT, EX. 8" W 91E WASHER SET IN 101" OF CURB
1ION 97,43
CROWN 6"1
7-9t�9 4' j EL.EVA
(*SEE SHT. 0 1)
FIELD'� CONFIRM E ST. WATERMAN DEPTH A2 C\
v PRIOR %TO CONS CTION OF.F�O�Pj ....... vv
W
`�!RFE VV RD ORM DRAI
A -
CON
CONNECT�,ONS 0 CHECK FOR FLICT.
LL
13 7,50
w
A9 8. 0 3
7.
NCEE ('JORNER 0.4' NORTH
FE
A �x
T)c
7 Y� 1,2'
te N. W. 4T U-1. 0 0 0 0 0 000c,
0 0 0 0 0 0
0 Q 0 0
0 OR, .000jqa 0 "D a 0, 0
0.0.0.,000*04
0 - . D 0, 000
00 0 0 0 0 0
0 00 w(l)
090,0,0060 '0000 0 a 0
0 0 a' 0 0 0 0900.g929g0.009g9000 00 f
9 09g929g9g92000 0 0 0 0 000
a 0 a 0 0 0 a 0 0
0 0 0 060 0 0 0 0 0 0 SET 5/8" REBAR WI 11-1 3'
0 0 0 v 53 00
0 2 q 0119-�boo-#N
00
0 0 Og '0 9 �181 ALUMINUM CAP
0 00 00 0,0000000 U
0� � - 0
100 �,q 0006.00 8
00 000,0 -`Ni FIN E FENCE
0 0000
0
0 -00 0 0
0
/V
N TYPE 2-48" W/
")SOLID LID
IE 93.93 (S)
A
z V�tl 1 -1,
IE 91.43 (30". E)
', , -6 , // ,
I N 9-.,5S A I EWE
-C )0.1 -----END 0 F F E N (,.,E 1 2'
N'p Of
I 1 9, �? 1 7",
r, '171�_ _�P' .. WE ST F 1. 1,11 E
ORD EQH.) 4
'ell/ ( W
7,
A
Xvf I
4
/M K D -/ 171'ORP/
100,
01.,50
J�f :&A , ,
A� -. 8 /
/BA IJE14T 4),k6
7
- PATIO`bRA(N_,1`/ /0
0
p 0 p �qe6ANS,TO/
YS
STORM' DETEP, 0 -71 Z %0APATE
�b
lo 1
K vo
p
I �19 -40 e / "I/
F LO
Y
3
0 r,:,NITY OF EDMONDS
nJ1L01NG DEPARTMENT
0
0 zg: deAza&g:.�
An - —5 7
7- U)
.X/V
DATE: (16
10
ell,
��----GARI AGE
INSIDE ,2
_0C
102.3
Tf FF
D CID(J(
E.
-FD- -N
`E
ON 1_111E
E N D OF FENCE
0 3' VqESI- OF LINE
0 4,:'-j 1
SET 5/8" REBAR WI-11.1 Y
ALUMINUM CAP
__404, 55
POINER POLE
�7 7
CALL BEFORE YOU DIG
1-800-424-5555
FOR FIELD LOCATION OF UNDERGROUND UTILITIES
WAPT,E STRh-'ET (ALLEY)
N
DRAINAGE AND UTILITI-ES. PLAN
SCALE: 1"=10'
GRAPHIC SCALE
-in n 5 10 20
( IN FEET )
I inch = 10 &
CHANNEL DRAIN PER DETAIL 9/C2.1
6" 0 STORM DRAIN LEADER (SD)
4" 0 PERFORATED FOUNDATION DRAIN (FD) EXCEPT SOLID WALL FOR EXTENSION TO CB.
6" 0 TIGHT LINE ROOF DRAIN (RD)
CLEANOUT PER DETAIL 6/C2.1
DOMESTIC WATER SERVICE AND METER PER CITY STD. - ASSUMED TO BE 1-X" TO BE CONFIRMED BY'.THE DESIGN/BUILD PLUMBING-MECH. CONTRACTOR
(SEE SHTNOTE 5)
FIRE SPRINKLER WATER SERVICE AND DDCVA PER CITY STD. - ASSUMED TO BE TO BE CONFIRMED BY THE DESIGN/BUILD FIRE SPRINKLER CONTRACTOR
(SEE SHT NOTE 4)
BUILD NEW C13 TYPE 2 OVER EXISTING SD LINE
CONNECT NEW SANITARY SEWER BLDG. CONNECTION TO EXISTING 10" SS WITH CITY APPROVED . "IN, SERTA TEE- (SEE SHEET NOTE 1)
WATER SERVICE TAPS PER CITY STANDARDS
G30" 0 DETENTION PIPE CMP OR N-12ADS PER CITY OF EDMONDS REQUIREMENTS AND PROFILE THIS SHEET
POST INDICATOR VALVE (PIV) - LINE SIZE PER SPRINLKLER DESIGNER.
FIRE DEPARTMENT CONNECTION (FDC) - PER SPRINKLER DESIGNER. MECHANICAL SAHLL ROUTE THE FDC PIPE FROM THE SPRINKLER RISER ROOM TO THE /3\
WALL MOUNT FDC (WHERE SHOWN) WITH ABOVE SLAB, WALL OR CEILING HUNG PIPE.
SANITARY SEWER CLEANOUT ON PUBLIC SIDE OF PROPERTY LINE PER DETAIL 6/C2.1 EXCEPT NTH LOCKING "LAMPHOLE" COVER PER CITY STANDARD.
4" PVC DRAIN LINE CONNECTING PATIO DRAINS TO STORM DETENTION SYSTEM. INSTALL NTH 0.010 ft/ft PIPE SLOPE. A4
SHEETNOTES:
1. THE EXISTING SANITARY SEWER MAIN AND STORM DRAIN PIPE HAVE BEEN FIELD LOCATED AT ADJACENT STRUCTURES (MH/CB) TO EAST AND WEST. ELEVATIONS FOR
CONNECTIONS HAVE BEEN CALCULATED FROM THIS DATA ASSUMING A STRAIGHT PIPE SLOPE. THE HORIZONTAL LOCATION OF THE EXISTING WATERMAIN HAS BEENnELD
LOCATED IN SIMILAR FASHION, HOWEVER THE VERTICAL INFORMATION FOUND IN THE FIELD VARIED BY UP TO 2.5'. AS A RESULT, THERE REMAINS A POTENTIAL FOR CONFLICT A
AT PIPE CROSSINGS. CONTRACTOR SHALL FIELD VERIFY THE DEPTH OF THE EXISTING WATERMAN AT CROSSINGS PRIOR TO CONSTRUCTING STORM OR SANITARY SEWER
SYSTEMS. NOTIFY TEC (CIVIL ENGINEER) IN THE EVENT OF CONFLICT.
2. PATIO DRAINS SHALL BE e 0 SATIN BRASS, wNDS" 910913*(SEE DETAIL 10/02.1) OR APPROVED EQUAL (UNLESS OTHERWISE SPECIFIED BY ARCH.
3. STORM DRAIN DETENTION SHALL BE PER CITY OF EDMONDS "DRAINAGE SYSTEM STANDARDS" HANDOUT.
4. FIRE SERVICE CONNECTION WILL BE SIZED BY THE DESIGN/BUILD FIRE SPRINKLER DESIGNER (THIS DRAWING CONSERVATIVELY ASSUMES 4-0). THE CITY REQUIREMENTS D A
CHANGE FOR 2"0 AND SMALLER. CONTRACTOR SHALL COORDINATE. ALL 4" FIRE SERVICE PIPE SHALLL'.'BE DUCTILE IRON, CL 50, PER AWWA C151, AND SHALL BE INSTALLE
WITH 3' MINIMUM COVER.. A4
5. DOMESTIC WATER SERVICE WILL BE SIZED BY THE DESIGN/BUILD PLUMBING -MECHANICAL CONTRACTOR. THIS DRAWING ASSUMES 1-VO - CONTRACTOR SHALL NOTE THAT
CITY REQUIREMENTS FOR 2"0 INCLUDE A 12N12"W TEE AT THE MAIN AND A 2" RESILIENT SEATED GATE VALVE PLUS A REVISED VALVLE LAYOUT IN COORDINATION WITH A4
THE FIRE SPRINKLER SERVICE TAP.
6. FOR ALL UTILITY TRENCHES IN* THE PUBLIC RIGHT-OF-WAY, CONTROLLED DENSITY FILL (CDF), 2 SACK MIX, SHALL BE USED AS BACKnLL OVER THE PIPE ZONE, UP TO A4
THE BOTTOM OF THE EXISTING PAVEMENT OR Y BELOW FINISH GRADE, WHICH EVER IS LOWEST.
-2A44oe� wIrH cilry sT1w4dAp_05.
Iw
:5 loo
nc
:C3
, �i 0!
CD C� A
Lj C=1 8" 0 OUTLET
0 ui "i "i
ta-M ___ I V)
C" C" CONTRvL__- Cn... M. ____ ___1
M -30 Uj w
6 MIN. CLEARENCE MtAbIUM) - - - - - - - : , , I I I
FROM TOP OF CONC. BOX I" MIN
OR RISER
25 LF 30" 0 DET PIPE 0 0.005ft/ft
A
... ... 90
APPROVED
FIR
A DEPARTMENT
c—
TUM ELEV
1 85.00
DET. PIPE PROFILE
SCALE: 1"=5'
ROUND SOLID COVER
MARKED "DRAIN' WITH
LOCKING BOLTS.
A4
RIM 95.93
CLEANOUT GATE:
SHEAR GATE. A
OVERFLOW ELEV. 93.93
6 MIN . - L ?, ,
41A
MIN
INLET PIPE- OUTLET PIPE
A IE 91.30 IE 9130 A
8" 0 RISER PIPE PIPE SUPPORT(s):
CD X .090"
-ToipTno vi ATr w m4 7A"
POLYPROPYLENE
orL
STEPS OR LADDER 7. DRILLED ORIFICE
FLOW CONTROL STRUCTURE NOTE: ALL DIMENSIONS AND
SHALL BE CB TYPE-2, 54" 0 MATERIAL SPECIFICATIONS NOT
PER WSDOT/APWA STD PLAN SHOWN HERE SHALL BE PER STD
8-3 (APPURTENANCES NOT PLAN
40 oTrREET FILE SHOWN FOR CLARITY)
r"RUt.."WRE
'.
F.0 oi
SCALE: 1"=3'
PLAN -
GL
,
1 .1 .
0+00
APPROVED FOR
CONSTRUCTION
S��Clty Engineer Date
_j
_j
C3
z
z
0
tn
z
UJ
V)
z
w
(n
z
Uj
C)
0
0
z
UJI
CD
z
UJI
U
U
z
w
C.D
C::1
CNI
to
C-4
Cn
00
4�
CL
w
to
C
N
W-op
MUSEUM
0
No
MM
90
an
121#111
wi
20
RUN
SSW
n
N
I I
an
INNER
I ME
I I
w
w
z
0
0
w
w
k
P40
Pr4
co
zw
SEPT. 20, 2002
IJob Number
237-WAN
Sheet
AM&
Sheet of
6�0
. . . . . . . . . . . . . .
slorE Nowros
1. GENERAL CONTRACTOR TO COORDINATE WITH THE LOCAL poWER COMPANY. SEE CIVIL DU.)38- f:OR
THE LOCATION OF THE POWER VAULTS AND UNDERGROUND SERVICE-
2. GENERAL CONTRACTOR TO COORDINATE WATER SERVICE WITH THE LOCAL WATER
DISTRICT AND/OR PU5LIC WORI<S DEPARTMENT.
3. GENERAL CONTRACTOR TO COORDINATE GAS SERVICE- WITH THE LOCAL GAS SUFFLIFER.
4. NEW SITE r-EATURES AND 15UILDING AREAS TO 5E STAKED ey A REGISTERED SURVEYOP-
5. GENERAL CONTRACTOR IS TO MAINTAIN AN ALL-cONSTRUCTION, ALL SUWACES
AROUND ALL SIDES OF- THE CONSTRUCTION r-OR f=IRE DEPARTMENT
VEHICLES, AS fREaUIRED 5Y THE RRE DEPARTMENT.
(o. SEE CIVIL PLANS FOR LOCATIONS 01-- HEAVY DUTY PAVING SECTIONS, LOCATIONS OF -
UTILITIES, DRAINAGE PLAN AND FINISHED GRADES.
-1. SHADED E= AREAS INDICATE PAVED SUFC-ACES.
9. COORDINATE SITE NEATURES AND CONDITIONS WITH CIVIL f=LANS. NOTFY ARCHITECT
or- ANY DISCREFENCIES.
s. PRE-FA15RICATED WOOD AR50R ARCH: MAGNOLIA MODEL 040-0410ro. ATTACHMENT: (1) 1*4 EAR AT EACH LEG
IM5FDDED all MIN. INTO 1211 x 1211 x 12" CONIC. EASE. DIMENSIONS: 30" x 60" x 81" W.
10. r-IRf= or
=pARTMENT CONNECTION TO SPRINKLER SYSTEM.
11.
eflaslA(20
1. THERE WILL ME NO SITE Sjc%NAC-sE OR 5UILDIW-a SIGNAGE OTHER T44AN
THE ADDRESS NUM5ERS IN 5RoN"Y;= LETTERS ON THE r-RONT Or- THE 5UILDINC-L
INSERTS FOR
HANDRAIL
EXP.dT.-------�
#4 x 21-011 , @ 18" OC EACH WAY-J
"��o-
#4 @ 18" OC EACH WAY
(2) #4 BOTTOM
1" OFFSET
/—#4 @=E=P15A1 680ffEBv
BAR AT EACH NOSE
/-EXP.JT.
L;UNU. �il/AIN
TYPICAL CON CRETE-STAIR-s'-.
DAYTON STREET
NG IDEWALK
S
TB
10'SIDE �SEA
LANDSCAPE LIGHT
15'STREET SET k,
CONC. SIDEWALK
98!
A
LANDSCAPING
BLOCKS
(DOES NOT 0
EXCEED 4�
ABOVE FIN.
GRADE)
CONCRETE
RETAINING WALL
SEE STRUT. DWC
11111m
EXISTING
6'H. CEDAR FENCE
AT PROP. LINE
13 RISERS @ 6.75"= 01
-4-
LANDING
+101.
0
42'-0 - V-4"'
LANDSCAPE LIGHT
I
Lo
Lo w
+
I, dj
LANDSCAPED
AREA (SEE SHT. L-1)
24'-0"
LANDSCAPE LIGHT
ROCK CIRCLE
CONCRETE DRIVEWAY
LINE OF DECK
OVERHANG
NOTE: HIC ACCESS ALSO AVAILABLE THROUGH
GARAGE. SEE BSMT. PLAN, SHEET A2.1
HANDRAJL
SEE 1/A1.0 DAYTON
CONDOMINIUMS
1 2
��Al.0
CONCRETE
RETAINING WALL
SEE STRUT. DWGS.
10'SIDE
rl-�m
+ WIM
-BO-G. HT. --
CALCULATION
2&
6'H.
CEDAR FENCE
a
Lu
DATUM POINT; PK NAIL 4 WASI-ER
SET N TOP OF CURIB
Ar-TUAL ELEVATION: S1.43'
Rm CE ELEVATION.- 100.00'
SCALE: N.T.S. K
CONC. SIDEWAL
Ut�: VA"
LANDSCAPE LIGHT
AF'
LINE OF ASPHALT
CONCRETE
1: D ;I G!
1&REARSETBA K z /-Z Z-Z-/ LINE OF PH CONCRETE
6* H. CEDAR
FENCEA ND
..........
VAL'1-11 z Z-Z../I
VAULTS
....................................
TizAl.i",
f TRANSF.
103' VAULT
......................
1-1/2"o SM. STEEL PIPE - WELDED JOINTS, PAINTED WHITE--,
VERTICAL LEGS 48' O.C.
J-BOX
TEMPERED FROSTED GLASS VAULT
PROPE LINE
PANELS. 1/4m7 THICK 12'
Yo
EXTEND RLAILING.1.20,BE NO J1
6'H. CEDAR TRASH ENCLDSURE
3-PH. TRANSFORMER VAULT WITH 6" STEEL PIPE BOLLAS 3
POST AT EA. END
., , ").- ;' . 6, x 6'CCNCRETE LID y
SirE r
11 'N' 'F ) EAR INSIDE DIM: 8'-9'X10!-0"
R !."1,3 1 D CL
SEE DETAIL
CHAIN LINK GATES W/ VINYL SLATS
BELOW 1,,; -;n, CE-75F" -f—, ALLEY.-i-,
AND 90 DEGREE SWING.
6'STEEL PIPE BOLLARD
CLEARANCE BETW. POSTS: 10'-0"
MEET REQUIREMENTS OF UBC SECTION 509 (GUARDRAILS).
AND UBC SECTION 1003.3.3.6 (HANDRAILS) AT STAIRS. NORTH
CONIC. APRON I ON
UT C�H
rT EACH POST
16 GA. GALV.
STEEL SLEEVE
TEGUL MINERALEAD
OR EPDXY GROUT
CONC. STRUCTURE BELOW
MIN.
POSr BASE DETAIL (N. rS)
/'-,-�STEEL PIPE HANDRAIL
Q—) SCALE: 114" = V-0"
RISE = 6.75", TREAD WIDTH 12n.
LCONCRETE STEPS BEYOND.
NON -SLIP BROOM FINISH.
,511 E HLAN
Scale: 1" = 8'-0"
WrO CtTtj VO- (A)
sl *F1
MAXIMUM 51JILDING HEIGHT
AVE. GRADE OF 51-Da f *AD m
100.3 + IOIA + 104A + 19*A
4
AVE. GRADE OF 5LDC1 PAD - 102-81
MAX ALLOWABLE 31-06L 14T. IN IRM IS ZONE
WIT14 SLOPED ROOF 10 30'.
MA>e- ALLOWA51-E 51-Da I -IT: 102.8 + 50. z 1320.
C
C A4-0-s
C\
ok
PC
ROVED AS NOTED
8'2Y ENGI�N�FRING
Date:
REVISED PLAN APPROVED
CiTy OF IMMOrMS BUUM1NG DIV==
PLANS EXAMNM
-
DATE '-'I—
APPROVED BY PLANNING
3t voto5-
Wlm�w
RECEWED
MAR 0 12005
PERMIT COUNTER
z
0
U5
Ld
Ir
U)
u)
cn
z
z
z
0
0
0
tn
z
0
P=
I=
a
III
M
6
P=
0
III
o
P=
p
III
Of
"
U)
LLJ
cD
z
<
2
5
Z
w
0
<
b
Z
w
0
0
Z
w
0
Df
LLJ
0
C14
0
N
a
C-4
0
C4
0
C"
C-4
04
to
t-
M
IM
C14
C,
U.)
di
Z.
CC w
ul Lu
(f)
0
0
C)
LLJ
Li
ry
Cf)
�7
0
n
LLJ
tn
0
w
00
O)o
Lo U-1
z
wm
U)
z
r-
I
r
N CN
=0
M 00
P4
CL s
=
Lo.j
0
U)
C-4 N
'4-4-
a
00
0
=
o
.q.
CL
CD. X
Cq
Sheet
Al m0
Sheet of
57029 A 14
MAR 10 2005
PERMIT COUNTER
10'ASIS OF BEARINGS
CENTERLINE OF DAYTON STREET AS SHOWN ON THE PLAT OF THE CITY OF EDMONDS AS RECORDED
IN VOLUME 2 OF PLATS, PAGE 39 IN SNOHOMISH COUNTY, WASHINGTON.
ACCEPTED RECORD BEARING BETWEEN FOUND MONUMENT IN CASE AND INTERSECTION OF DAYTON
AVE AND 6TH AVENUE S..
LEGAL DESCRIPTION
LOTS 16 & 17 OF BLOCK 121 AS SHOWN ON THE PLAT OF THE CITY OF EDMONDS AS RECORDED IN
VOLUME 2 OF PLATS, PAGE 39 IN SNOHOMISH COUNTY, WASHINGTON.
GENERAL NOTES
1. THIS SURVEY IS A BOUNDARY AND TOPOGRAPHIC SURVEY AND DOES NOT SHOW MATTERS
TYPICALLY REVEALED BY A TITLE REPORT SUCH AS EASEMENTS AND OTHER ENCUMBERANCES
WHICH MAY EXIST ON THE PROPERTY
2. INSTRUMENTATION FOR THIS SURVEY WAS A 3-SECOND NIKON DTM 521 TOTAL STATION.
PROCEDURES USED IN THIS SURVEY MEET OR EXCEED STANDARDS SET BY WAC 332-130-090,
3. THE INFORMATION ON THIS MAP REPRESENTS THE RESULTS OF A SURVEY MADE IN JANUARY
2002 AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS EXISTING AT
THAT TIME.
4. UTILITIES SHOWN ON THIS SURVEY ARE BASED UPON ABOVE GROUND OBSERVATIONS. ACTUAL
LOCATIONS OF UNDERGROUND UTILITIES MAY VARY AND UTILITIES NOT SHOWN ON THIS SURVEY
MAY EXIST ON THIS SITE.
CONTOURINTERVAL
1.0'CONTOUR INTERVAL - THE EXPECTED VERTICAL ACCURACY IS EQUAL TO 1/2 THE CONTOUR INTERVAL
OR PLUS / MINUS 0.5'FOR THIS PROJECT.
VERTICAL DATUM
ELEVATIONS SHOWN ON THIS DRAWING WERE DERIVED FROM ELEVATION DATA
PROVIDED BY THE CITY OF EDMONDS.
DATUM
AN AS -BUILT INVERT ELEVATION WAS ADOPTED FROM THE SANITARY SEWER MANHOLE
LOCATED IN AT THE INTERSECTION OF DAYTON STREET AND 6TH AVENUE SOUTH.
INVERT ELEVATION 92.94 PER CITY OF EDMONDS AS BUILT RECORDS
w
E
S
0 10 20
I'A'AA-A
GRAPHIC SCALE: I I
C"
C)
b
c:)
z
94.3�
FOUND MONUMENT IN CASE
9
9
FENCE CORNER
0.7'NORTH & 0.5'EAST
FOUND REBAR & CAP - LS 9175
0.1 TEAST & 0.35'SOUTH OF CORNER
NOTE: A FIRE HYDRANT IS LOCATED 120'WEST
OF THE NORTHWEST CORNER OF THIS PROPERTY ROCKERY -
ALONG DAYTON STREET
N 659.42'
PROJECT BENCHh
PK NAIL AND 3"W)
SET IN TOP OF CU
ELEVATION 97.4�
N900 0'00"E
STREET WATER METER
SIGN 4"�ECIDUOUS TREE V DECIDUI
OR n.
,p/ X95.1 5
A
.. . .......... .. -----96
1.3 WIRE FENCE
.7 . ....... - -97 -------
36" CONIFER'04
9.72'
97
6
FENCE CORNER I - WIRE FENCE
0.6 WEST OF LINE >
X98.9 H
99 -
X1 00\2
%
0
� xxxot,
FENCE CORNER
0.'4'NORTH & 1.2WEST
P6.64
8.1 7
x
WIRE FENCE
r
WOOD FENCE
x
SET 51&'REBAR WITH
3�'7'ALUMINUM CAP
X98.2
WIRE FENCE
CONC.
STEPS
X98.7 c%1
<98.4
. .....
....
7
WOOD
x
DECK
'60.1
1
//--- END OF FENCE
FLOOR
N = 102.00 4. -0�
100 4x
5-29'
xi 0�6. 9
LOT 16 & 1 6,601 SQ. FT.
X10"I.0
0 ';A'
160.86
�-_ "
00.70
9.42
101.yd
/X
Z:
101.6
1,101.37
X101.52
101.70X
102
x
X102.8
102.79,1
x103
.......
02.76
X102.81
Xi
103
E 0 OFFENCE
/�V
0 ZWEST OF LINE
... ........
1.2'WEST OF LINE
X101.6
N
102.
GARAGEi
INSIDE 0,�'
�102.3
GIs
24" DECIDUOUS TREE
ISO
GpIsy
La
GARAGE
6.8y
ON LINE
"'104.20
vs,
103.2
C4
END OF FENCE
OZWEST OF LINE
104.
104
�104.2
""I fil.20
X104.5
_x1 0 4 .51
FOUND REBAR & CAP - LS 9175 ITh
0.39' EAST & 0.07'NORTH OF CORNE N890,548'2 "W
Ui
CATCH BASIN EDGE OF ASPHALT ALLEY
RIM 102.02 Q!txL
xt
0. H.C- O.i I.E.
X103,92 X c
CATCHI BASIN CATCH BASIN POWER POLE
RIM = 102.87 RIM = 103.59
�FOUND MONUMENfFk�
FOUND PK NAIL AND WASHER
0. A D 1.47'N RTH
(OFFSET PER ROS 9507215001)
119.9y
30.w
0
L6
C14
w
C)
30.00'
SANITARY SEWER MANHOLE
W Adk 1. 1. 1.=
O.H.E.
O.H.E.
POWER POLE
N89056", 659.641
MoEhLF='Lfi=-: 5"r F:; IF.= F.=`r
SURVEYOR'S CERTIFICATE X
THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER WA i
MY DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE
R�CORDING ACT AT THE REQUEST OF LEE WANGERIN
IZANU,2002 34
0
LA
CERTIFICATE NO tZ644
EXPIRES 12/29/21
RECEIVED
? n
SW 1/4, SW 1/4, SEC. 24, T27N, RK, W.M.
SURVEY FOR: MXP LAND SURVEYING, INC.
24829 SE 38th St, Issaquah, WA 98029
LF.E."t WANGERIN www.mxplandsurveying.com
(425) 837-8083
12408 106th PI NE
Kirkland, Washington 98034 DRAWN BY: CHECKED B DATE: PROJECT#: SCALE: SHEET: 1
MXP TNW 1/12/2002 2002-1 1 1" = 10' OF:
I -
64-0�r
5�ro 9�� r