Loading...
551 MAPLE ST.PDF11111111111111 12132 551 MAPLE ST ADDRESS: TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE) - COVENANTS (RECORDED) FOR - CRITICAL AREAS: DETERMINATION: 0 Conditional Waiver E] Study Required E] Waiver DISCRETIONARY PERMIT fl'S: DRAINAGE PLAN DATED: I t PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: — PERMITS (OTHER PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE S: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED:_ SIDE SEWER PERMIT(S).#: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: OTHER: L\TEMP\DSrsTomis\Street File Checklist.doc PLANNING DATA STREET=FILE - Signs - Name: J'�f CVJL4rCho-� chh5+- 5cjen-hst Date: Site Address: 15-51 Pit, 51-yeef Plan Check#: BLD-2007- 98�0 Project Description: Ntw m oviLA vo �w t �;, f 9 K) Reduced Site Plan Provided: (Xj�P NO) I Zoning: Comprehensive Plan Designation: [)OVVVMVVVL__ Map Page: 0 '�7 (OTtt &V/ Corner Lot: ( OES NO) KAP171C.- Flag Lot: (YES ,7 "0 eg i e�fi'vl 13 ADB File # (or date waived): &L?P W 0 ttAn TOTALAreap Typeof Type of Sign Allowed in zone? Matrix conditions met? Allowed area per unit Unit TOTAL sign area allowed for this sign Proposed sign area Example Wafl wAnternal illumination Yes, with conditions Yes I sq. ft.Ilineal ft. attached wa# 41 ft. attached wafl 41 square feet 20 square feet S, #1 moinualent -ID 000A e,X - (-P tDtA 1) L) ce" D lot, 301, -9 Sign #2 Sign #3 TO TA L � Area for Tenan tlSite Max Permitted: Previous Total: Proposed Total: Height SignType: M0VVVV1&V1J- Max Permitted: ActualHeight: 3011 Sign Type: Max Permitted: Actual Height: Sign Type: Max Permitted: Actual Height: S�yn Lighting Sign Type: Y� U, Vy) eNJ Proposed: No"e, Allowed in Zone: Sign Type: Proposed: Allowed in Zone: Sign Type: Proposed: Allowed in Zone: 0 PLANNING DATA 0 [ STREET FILE 11 - Signs -- Sign,Colors Proposed: Acceptable? Requires ADI3 Approval? Sign Location If freestanding and 3-feet or over (unless a fence) meets setbacks? e Setbacks Street: F—*i d e: M �jde- (W) D' Rear- SlYeei mT, . Actual Setbacks, Street: --l-�ide: —P�� e: Rear: LandscqpZV for Freestanaft!S��'! Size: Location: Critical Areas Determination M Study Required Waiver Other Thi,q cvi�vi pDp5etl Dn J46 Wy-tjirf- to Mntu�l C4,01Y19 coi 3 V1 c 47 Laoo(,�cCA,FM tWfM C2� Je C(C.? 67 I'OVI C4 VeCL, LA v-j(:7L4 a Vit fD 0.(00,OL+57, ClYl 10601 CYWC.f?7' "d P104- VVI V1 %(t<,,V1 ti, Plan Review By: a",;, ,ei The City of Edmonds APPLICATION for $WE SEWER PFZMW NEW CONSTRUCTION C] REPAIRS EASEMENT No. .... 14 OwxER ...... ........ C_4 1,17-CONTRACTOR ....... ........................................... PER?M No(;iii4- ADDRESS ........... M ........... .............................................. LEGAL DESCRIPTION: LOT BL()CK N . . ...... t621 ............................ I - - - A- - uj Ll A APR 2 S69 Approved: CITY OF -EDMONDS CIVIC C ENTER — WATER -a -SEWER DEPARTMENT Call PRospect 6-1107 when work Is ready forinspedion. ANo Inspec- tions Saturday; Sunday or holidays.) N2 it) SIDE -SEWER PERMIT 2.65 ADDRESS... 551 Maple Street .................................................. . .............................................................................................. OWNER ..... Urst ... P! ph of Christ Scientist . ............................................................. CONTRACTOR .......... Me.t.v.o ... Sevier Perinission ' ' I " is ' 'granted .................. April ... 2.3 ..... 196.9 ... I for ........................ days to REPAIR or CONNECT a side sewer with City.Sewers In accordance with application on- file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. i—The owners of the Property may obtain a permit to construct sewer in Id . e property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street area. Do not cover any posrtion of sewer before it has been Inspected. NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. No. 3—,Top of side sewer must have at least 30 Inches coverage at property line and 12 inches Inside property line; minimum grade of 2%. No bends in grade sharper than % will be permitted. NOTE No. 4---Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due, to Improper work which may develop within one.year of completion. NOTE No. 5--It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appur- tenances except to insert the pipe Into the wye. 1 0 n n I REID MIDDLETON April 19, 1989 File No. 21-89-002-001 ON -SITE STORMWATER DETENTION CALCULATIONS FOR PROPOSED PAVING OF EXISTING GRAVEL PARKING LOT FOR FIRST CHURCH OF CHRIST SCIENTIST 551 - MAPLE STREET EDMONDS, WASHINGTON EXISTING CONDITIONS The existing parcel is developed with a gravel parking area,. sloping in a northwesterly direction to an existing storm sewer system in the alley way. The parking lot is divided into two parts; one paralleling the alley north of the church building and the main parking area west of the church. The longest distance to the existing catch basin in the alley is 207 ft. with an average slope of 2.3%. Tc = 207/3.1(60) + 10 min. = 11 min. Using the Everett rainfall intensity curve for 10 yr. design storm I = 1.85 in/hr. Area of the existing parking lots = 12,196.80 sq.ft. or 0.28 acres / Existing c for the parking area = 0.80 Q existing = c(i)A = 0.8(l.85)0.28 = 0.414 or 0.41 c.f.s. Using the Y�anainen and Warren Method for simple system design the following calculations are to determine the required volume of detention for this project: Qo 0.41 0.90(0.28) = 1.63 T= J _2� — -25 1.63 = 12.19 min. Vs 3607 (12.19) 12.19 + 25 - 40 (1.63) 12.19 = 1,182.29 - 794-79 = 387.50 c.f./AcC V total = 387.50 (0.90) 0.28 = 97.65 cu.ft. 19031 33rd Ave. kN., Suite 301 P.O. Box 6638 Lynnwood, VVA 98036-6638 206/775-3434 0 0 Onsite Stormwater Detention Calulations for Edmonds First Church of Christ Science April 19, 1989 File No. 21-89-002-001 Page 2 Sizing the Detention System Required detention = 97.65 cu.ft. 12" pipe = 0.7854 cu.ft./l.f. CB Type 1160" = 19.63 cu.ft./v.f. v.f. = vertical foot CB Type 1 = 3.97 cu.ft./v.f. Install 69 Lf. 12" hel. al. st. sewer @ 0.7854 = 54.19 cu.ft. CB No. 1 Type 1160" 1.65 v.f. @ 19.63 = 32.39 " CB No.2, 3 & 4 Type 1 total V.F. = 4.57' @ 3.97 = 18.14 " Total Volume Provided = 104.72 cu.ft. Volume Required =-M65 " Excess Provided = 7.07 cu.ft. Sizing the Discharge Orifice Q allowable = 0.41 c1s. Using the Orifice equation Q = cdA -f2—gh Solving for A 0.41 0.6276TW(I-.6-5) 0.0642 sq.ft. Use 3 3/8" orifice with A= 0.0621 sq.ft. Ir:GEP:lSTCHRSC.ARM RECEIVED CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAM /NAME OF/BUSINESS MAILING ADDRESS J Cl TY ZIP TELEPHONE NAME ADDRESS CITY ZIP I TELEPHONE NAME ADDRESS CITY ZIP TELEPHONE STATE LICENSE NUMBER EXPIRATIONPATE CHECKEDBY L PROPERTY TAX ACCOUNT PARCEL NO F-1 NEW RESIDENTIAL n ADDITION COMMERCIAL C] REMODEL APARTMENT REPAIR 0 GRADING CYDS DEMOLISH [3 TANK GARAGE 0 RETAINING WALL 1:1 CARPORT PrirwPPv (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN PLUMBING/MECH COMPLIANCE 08 CHANGE OF USE SIGN FENCE ( — X OTHER RENEWAL NUMBER NUMBEROF CRITICAL OF DWELLING AREAS STORIES UNITS NUMBER DESCRIBE WORK TO BE DONE HEAT SOURCE I GLAZING % . I ' LOT SLOPE % FT) PLAN CHECK NO: VESTED DATE THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO t BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT APPLICATION: 180 DAYS 0. PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS SEE BACK OF PINK PERMIT FOR MORE INFORMATION W "APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS U) W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF _1 2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE 0 —i DEEMEDTO MODIFY, WAIVE OR REDUCE ANY REQUIREMENTOF ANY CITY ORDINANCE 0 NOR LIMIT IN ANYWAYTHE CITY'SABILITYTO ENFORCE ANYORDINANCE PROVISION." I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION GIVEN IS CORRECT., AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC- TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27. SIGNATURE (OWNER Op'�GENT DATE SIGNE9," ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI- CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109 �10. PERMIT EX131RES USE PERMIT ZONE NUMBER JOB SUITE/APT# ADDRESS PLAT NAM E/SUBDIVI SION NO. LOT NO. LID NO. LID FEE $ PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP TESCP Approved RW Permit Required 0 0 Street Use Permit Req'd 0 EXISTING — PROPOSED Inspect:on Required 0 Skle��a k Required 0 REQUIRED DEDICATION— FT Underground r ng requir 0 METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO 0 Lu REMARKS z z OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE 0 _51AA1 (F,��57 T/, Z t ze z W ,;,w, AJ ENGINEERING REVIEWED/DATE FIRE REVIEWED BY DATE VARIANCE OR CU SHORELINE OR ADB# INSPECTION BOND 1) k6 — 2 -7,21) REQ'D POSTED I 0 YES 0 NO SEPA REVIEW SIGN AREA HEIGHT COMPLETE EXEMPT ALLOWED PROPOSED LOWED PROPOS AL ED I ( 11 11 EXP LOT COVE RAGE REQUIRED SETBACKS (FT.) PROPOSED SETBACKS (FT.) ALLOW,ED FRONT SIDE REAR FRONT UR SIDE REAR /PROPOSED /A 10, 1 -zirl /V z z PARKING LOT AREA PL�NNING REVIEWE9'BY,-* DATE _j REO'D _I PROVIDED I &V, a. Lh., CHECKED BY TYPE OF CONSTRUCTI0777CQ�,D�,_ OCCUPANT GROUP SPECIAL INSPECTOR JAREA OCCUPA4T REQUIRED E] YES LOAD REMARKS a PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'Dj i K 15 1:10 VALUATION I FEE PLAN CHECK FEE BUILDING PLUMBING MECHANICAL GRADING/FILL STATE SURCHARGE ENG. REVIEW FEES I V ENG. INSPECTION FEE LANDSCAPING INSPECTION FEE PLAN CHECK DEPOSIT RECEIPT, I / TOTAL AMOUNT DUE CALL FOR INSPECTION (425) 771-0220 EXT/333 771-0221 FAX / � '-16,, IPT7;, APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his/her Deputy: and Fees are paid. and receipt is acknowledged in space provided. zFICIALS SIGNATURE DATE ELEASED BY .,,bATE V ORIGINAL - FILE YELLOW - INSPECTOR PINK - OWNER GOLD - ASSESSOR �A'� o. q2,�� - 771- 022 OATE', ID - 2 — 07 rz -0 Lg C Z Cz 0 00 �j 6 , it] P mo 0 1%j 132006 Edition IRC W/WAC Amendments 02006 Bdition JBC W/WAC Ameadwab 132006 Edition UpC W/WAC AmmdmeM lind APPWdic4is A, B, 0 1 132006 Edition IMC w/WAC Anwn&nents 132006 Edition JFGC w/WAC Anwr Ahr 132006 Edition wc w/wAc Amendme seats 132006 Edition VIAQ WAC 51-13 ab C32006 Edition WSEC WAC 5 1 -11 -D)v i -T Y ()r C,- 0 m () m ?1 5 PLAN t� I m A Wl CZY) A �-h*Oyl�> APP13OVED BY PLANNING tMMIlk..' (,,497,f A A,- i r) SIGN 4�" -7 Ckrot)4"ar) Science Gurck 00 co (j) n 'Jim �-,PPROVED AS NOTED 0 BY ENGINEERING -Pllj� I -d�a - — Date: --# �11 RESUB OCT 10 2007 BUILDING DEPARTMENT CITY OF EDMONDS r )PQ-17.-S c/- 7)9a) - -) 1,0REET FILE ------- ----- R�-A CHRiSTIA-Nt SCIENCE C H U R C H S E R v i C E S A// A T*lcom(, StJndaY Service 0:00 am -4c Sunday School 10:00 am Wednesday TLstin)o, y M16-ting 7: 30 prn RE!ading Roorn 120-C Sth Ave, S j� 1-9 w, 3P . ."= - OP:L 9 , 2s "Ain: VAX- 317.o jN Iv te SIX )ApWlh(f AWAF - (7,Y)M,- wlr# Z, ao i 0; rj W(o 0 LROM040'm 0 24 0 se,4z,, - Ye - = / If ON A lfdlw" 0 L 4 2q 0 m , , div 6t 4,40 (i) ID rh Zone Come�—/fla&__ Setbacks Required Actmal Front Sides Rear Other Heiwlt 080000 0/(- 0 Q a a V-4 10 IV �8"--00 -O^W A' 'fe 0.14L.' ANW-1 CHR15TIAN SCIEACf- CRUPOA RECEIVED P-3 -NCYFED SEP 2 8 2007 pY EPGIMERINCA BUILDING DEPT. D, ee: SlKtE T FILE � (1/- 5 7� Yll"'I'di RECEIVED SEP 2 8 2007 BUILDING DEPT. STREET FILE 10 LF. 6" SCH. 40 PVC 01) 1.0% CB No. 4 TYPE 1 30 LF. 12' . (a-) TOP 94.80 0.50% 9 LF. 12" (dD IE 93.1 Q 0.50%- '1� 9 .77 3.60% CB 94.53 Lo 6' - INV. 92.93 CB TOP'-o--- A 9532 91.60 pp INV. E G' T.O.W. 90.41 98.327 INV. N\� 8" 89.95 PLANTER CB No. (TYPE 11 60") TOP 96.50 6" IE. 93.03 12" IE. 93.03 (SEE DETAIL)--- T.O.W. ........... .... 100.83 ................ ..... ......... ........ .... ....... . . .......... mm - T.O:W. 100.73--// PLANTER I PLANTER 101.01 IOLIT 101.36 PLAN"i 11�7MATCH EXISTING BACK OF WALK WITH NEW SURFACING j SLOPE REMOVABLE END CAP WITH NEOPRENE GASKET-------' 3 3/8" ORIFICE SHOP DRILLED IN END CAPn----:/4, CB No. 2 TYPE I TOP 95.50 IE 93.08 30 LF. 12" (cD 0.50% CB No. 3 TYPE I TOP 96.20 IE 93.23 17)0 96.50 IL COA ROCK SURFACE B 96.20 pp _40 PLANTER STAIRWAY cr_ w z -i CL PLANTER 101.49 --BACK OF CONCRETE WALK PLAN SCALE: I"= 208-0" SOLIDLOCKING LID TOP 96.50 I F-A W�', 1C..11 '93.03 �l qll z CB TYPE Ill 60" ID % DETAIL - CB No. I SCALE : 96.90 RIGHT-OF-WAY CONCRETE WALK STAIRWAY 97.21 97.25 EXISTING CHURCH BUILDING CONCRETE WALK RIGHT-OF-WAY ul PLANTER PLANTER MAPLE Street 0 98.68 ui I (D 01 uj I -VARIES 0.17' COMPACTED DEPTH CLASS "B" ASPHALT If CONCRETE( 2") c_% z u 98.66 99.12 0 0 < < _j a- 0 �L T_ 30' __r (.0 L-upiE 051- MATCH EDGE OF EXISTING VARIES SURFACE WITH NEW PAVEMENT -EXISTING OIL COAT ALLEY SURFACING COMPACTED AND REGRADED EXISTING GRAVEL SURFACE 0.33' AT EDGE MATCH DETAIL B-B ASPHALT CONCRETE SURFACE DRAINAGE DIVERSION BUMP SCALE : NTS GENERAL NOTES: 1 . ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS PROJECT. 2. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS 24 HOURS PRIOR TO AND DURING WORK AND OBTAIN ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION. 3. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS PRIOR TO BACKFILLING UTILITIES. 4. EXISTING UNDERGROUND FACILITIES HAVE BEEN SHOWN ON THESE DRAWINGS FOR THE PURPOSE OF ASSISTING THE CONTRACTOR IN LOCATING SAID FACILITIES IN THE FIELD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ACTUAL LOCATIONS IN THE FIELD AND CHECK- ING WITH APPROPRIATE AGENCIES THAT MAY HAVE UNDERGROUND FACILITIES WITHIN THE PROJECT i ACILITIES RESULTING FROM HIS OPERATIONS. 5. A COPY OF THESE APPROVED �PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION I IN PROGRESS. 6. IT SHALL BE THE RESPONSIBILITY, OF THE CONTRACTOR TO CLEAN, FLUSH, DISINFECT WHERE APPLICABLE AND OBTAIN SATISFACTORY APPROVAL FROM THE CITY OF EDMONDS REGARDING THE QUALITY AND INTEGRITY OF EXISTING WATER LINES, SANITARY SEWER LINE, STORM SEWER LINE, RETENTION SYSTEM ETC. WRITTEN ACCEPTANCE BY THE CITY OF THESE PROCEDURES MUST BE TRANSMITTED TO THE DESIGN ENGINEER. 7. THE CONTRACTOR SHALL INSTALL ASPHALT CONCRETE SURFACE DRAINAGE DIVERSION BUMP ADJACENT -TO ALLEY TO DIRECT SURFACE DRAINAGE TO CATCH BASINS AS SHOWN. 8. THE CONTRACTOR SHALL REbRADE AND COMPACT EXISTING GRAVEL SURFACE IN PARKING LOT TO A UNIFORM SLOPE TO THE CATCH BASINS AS SHOWN AND DIRECTED BY THE OWNER'S REPRESENTATIVE. w LL 0 w 0 a w 0' T 0 61 VARIES 0.17' COMPACTED DEPTH CLASS "B" ASPHALT 1.01 CONCRETE SLOpE 0.5' VARIES SLOpE VARIES COMPACTED AND REGRADED EXISTING GRAVEL SURFACE DETAIL A -A ASPHALT CONCRETE SURFACE DRAINAGE DIVERSION BUMP SCALE: NTS 7 a ,4n z 0 w ld 6 z C 0 00 < 4-J 0 0 C 0 0 C 3: c Ln 0 0 V) %.- Q) C 0 0 >, (1) w 4-J 0 -0 V-) -0 > pr) 0 c ryo, LLJ z J 0. z W 0 w cl) Z z < z 0 z 0 z W 1. 0 LL w W LLO w Lu w I- < u cr. 0 I- Cn LL $CALK AS SHOWN DKG' ARM SHIERT NO. CH. JO F.8 Q4/441 .1 1 SN"Te DATX FEB. 1989 FILK NO. 21-89-002 A, - 14W Mme Tot Woll000 Slabsugh A""Aft Davatmat From O"m b"411 Inginoorift Departomat subjeats NIX&t Church of Christ sousust Fir"Osed Building an Maple, Avo=Ao CO/It $*Pt*Nbft 123, IM 16 a.PA* %* bViUUJAS plow for tho above wabloet, The Dopavument r*qkdraments ago 40 folums Ths 4114Y 10 to be Surfaced to a width of tw*lvo foot (12s). 2. Surface drainage is to be collected in cat4h ba*iuo in the allay aad m in a tight line of sight inch (all) =in. dia. to the existing atom sewer line in sixth AvWvAe. I 0 n., "r --amox— C) 9 0 - 1 9 f 1WA Y RIGHT-OF-WAY CONSTRUCTION Perwit Number. L? _0 le,7 rt J Wue Date: A. Address or Vicinity of Construction: _ 551 Maple St. (9320903) B. Type of Work (be specific): Install NPTj Rpryire I' ut C. Contractor: Washingt-on Nat'l. rag Cn- Mailing Address: 815 Mercer q.t. Si-�attl P, Wn. State License #: 98111 D. Building Permit#( - if applicable): Contact: Frank Swan Phone: Liability Insurance: Bond: $ Side Sewer Permit # (if applicable): E. [:) Commercial E] Subdivision [:1 City Project Rk Utility (PUD,.GTE, WNG, CABLE, WATER) F1 Multi -Family EJ Single Family n Other INSPECTOR: INSPECTOR: W F. Pavement or Concrete Cut ig Yes []No G. Sizeof Cut: (1)2 x 4 H. Chargt�_$ CW,6/6 GAs APPLICANT TO READ A_N GN F f INDEMNITY. Applicant understands and by his signature to this application, agrees &.1d tcee City ofEdmonds harmles)from i j,.), d3mages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense ofany legal proceedings including defense costs, and attorney fees by reason ofgranting thispermit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIPAND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL 'ORATION INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESI *E4 BE HELD UNTIL ­�I W_ AALTREETPATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROUEMED FOR ISSUANCE TO 7 1 WANT Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved 'material prior to the eifd-of the working day; NO EXCEPTIONS. Ihave read the above statements an d understand thepermit requirements and thepink copy of thepermit will be available on site at all times for inspectionpurposes. 14 J July Is, 1993 Signature: z6"'LiA �<;CO Date: (Contractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPRO VED BY: TIME AUTttO,RIZED: VOID AFTER 9 -10- Oil DAYS RIGHT OF WAY DEPOSIT DISRUPTION FEE/FUND 111:.. NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Engrg. Div. 1991 FIELD INSPECTION NOTES (Fund ill - Route c6py to"Stre-et Dept.) I Comments: I Diagram.: CONTRACTOR CALLED FOR INSPECTION El YES NO Partial Work Inspection by P.W.: Work Disapproved By: Date: - FINAL APPROVAL BY: Date: - Addendum to City of Edmonds Right of Way . 10,ft %* 4. % I %, 4. AU ... Submitted by: Guyla Connors Engineering Aide Washington Natural Gas 521-5248 Jc)r3 -W 14, JN—s-PH,6�--7 I 'S '�) . I I WPLE WNG to window Water main depth gas main -w- water -g- gas - -ss- sewer -e- water hydrant 0 water valve 815 M=er St. (P.O. Box 1869), Scattic, WA 98111 (206) 622-6767 r L FIRST CHURCH OF CHRIST, SCIENTIST CHURCH: 778-4007 August 28, 1991 Mr. Gordy Hyde Engineering Department City of Edmonds 250 5th Avenue North Edmonds, WA 98020 Dear Sir, 551 MAPLE STREET EDMONDS, WASHINGTON 98020 READING ROOM: 778-3553 Afecel V, Z. Lo AUG 3 0 199, 117VQ1/V'6�r1//V0 This letter is written as a follow-up to your recent telephone conversation with Evelyn Bishop. We are asking your consideration of our request that the City Engineering Department paint a yellow line, approximately the length of two cars, on the curb directly in front of the Maple Street entrance of our church. It is necessary that this space be available for our use on Sunday mornings, Wednesday evenings and periodic evening business meetings. Sincerely, The Executive Board Mrs. Patricia M. Thornton, Clerk C,f-' 13 �Sap. eo" %oft March 3, 1992 Mr. Gordy Hyde Engineering Department City of Edmonds 250 5th Avenue North Edmonds, WA 96020 Re: 8-28-91 Request.from First Church Dear Sir: of Christ, Scientist, Edmonds I am writing relative to our several telephone conversations as well as our original written request of August 28, 1991 for a yellow line to be painted on the curb directly in front of the Maple Street entrance to our church. When I talked to you on January 27, 1992 you indicated that you would check on this job. As you will recall, the curb was painted adjacent to the parking lot driveway but not in front of the church entrance as per our original request. We will appreciate your assistance in the completion of this project, as soon as possible. Thank you. Sincerely, h112 Evei B i shop 7 - 83 78 Evelyn R.'iishop 633 Main Street, #203 Edmonds, WA 98020 D hP, 9� j LJJ 2 B 4 NIAR Gordy Hyde .Engineering Department City of Edmonds 250 5th Avenue North IP& onds, 'iIik 98020 11111111dillif If fit 111f flit P- d 9 0 - I () 13 - CO&ATION CITY OF -EDMONDS ORDER' CIVIC CENTER.� EDMONDS, WASHINGTON 98020 - (206) 775-2525, EIPURCHASE REQUEST F�/_T DINVENTORY REQUEST P�I WORK REQUEST ------ - ---- D, THIS* NUMBER MUST,APPEAR' 'ON !XLL INVOICES,1'1.1� PACKAGES, BILLS'OF, LADING,_ AND CORRESPONDENCE-- YERWRIPHO DOCUMENT NUMBER 12155 '013DER-DAT.E, 1_13,�TCH -DATE, -7 PLEASE FURNISH THE FOLLOWING ITEMS: 114E4 I �UNIT, *�;,CATALC 1G` ' "'NUMBER-- DESCRI d IMUNIT- III[CQST Tax COST, ESTIMATED, ?�7 _u - --- JtDD) - -- - ----- 4�1- P,> AEO P REQUESTED BY: 4 &W APPROVED BY - RECEIVED BY- 0 "t 2 3 4 5 6 7 8 9 10. 12 Z 0 U W 0 L1. CITY OF EDMONDS , W Q �_"_'F'7 ,, 69-226 F­ Permit No. COMMUNITY SERVICES DEPARTMENT L RIGHT-OF-WA,'V CONSTRUCTION PERMIT Issue Date B. 9 Contractor: �pi 6_ A. Owner: I C 10-1 fc(a N!F_f Na y &16 244 MaR,RtVdr6ss u)A Mailing Addr S 9s t' fync' 61ty State Zip eity State Zip State License Number Telephone Number C. * Address or Vicinity of Type of Work to be E D. 0 Work in Connection With: El Sub or Plat 0 Single Family El City Projects X-Commercial 0 Multifamily 0 Utility E. 0 Pavement Cut: El Y *N F. Size of Cut: — X APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to. this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress and at completion. • Restoration to be in accordance with City Code. • Street to be kept clean at all times. , • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. understand the above and that this permit must be available at the job'site for inspection purposes at all times. Signature: Date: 1 Owner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: #414 �k- Time Authorized: Void after - /00 days. Special Conditions: RELEASED BY: '716 Date PERMIT FEE: 30— Restoration Fee: * Receipt No.: A2_'-';b_3 Fund I I I Fee: Street Cut Dimensions: INSPECTED BY NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE Date Lng. Uiv. Marn 19ZS9 FIELD INSPECTION NOTES (Fur, I I - Route copy to Street Dept.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng.- Div. July 1985 T ®r F R E CE I V E D APR � G 1989 ENGINEERING April 25, 1989 File No. 21-89-002-002 Mr. Jerry Hauth, P.E. Hydraulics Engineer City of Edmonds Public Works 250 -5th Ave. N. Edmonds, Washington 98020 Subject: On -site Stormwater Detention System for Proposed Paving of Existing Parking Lot Dear Jerry: At the request of our clients, First Church of Christ Scientist, we are sending you three copies of the proposed on -site stormwater detention facility plan and calculations for the proposed paving of the existing parking lot at 551 Maple Street, for your review. The existing timber wheel stops and the existing planters in the center of the main parking area will be removed. The planters are not shown on the enclosed plan, but were included in the calculation of the existing runoff coefficient. If there are any modifications necessary for approval, or if the attached plan and calculations are acceptable, please contact this office so that we can advise our client when to apply for the paving permit. Sincerely, REID MIDDLETON, INC. Enclosure Ir:gep\frstcr.arm 19031 33rd Ave. W, Suite 301 P.O. Box 6638 Lynnwood, WA 98036-6638 206/775-3434 CITY OF 200 DAYTON ST. - EDMONDS, WASHINGION 98020 - (1`0�)) DEPARTMENT OF PUBLIC WORKS Dear Resident: HARVE 11. HARRISON MAYON March 16, 1981 On February 17, 1981, the Edmonds City Council passed Resolution 488 for construction, reconstruction and repair of deteriorated sidewalks. A public hearing will be held in the Council Chambers at the"Civic Center on April 21,1981 at 7:30 P.M., You are invited ari _to__atte,nd..,�his he. ng for discussing,�' ' ' 1. . I , . I _7 - 1� , - -7, �'. repair of portions of Ae ter iora'ted;.:.'si'de�4alik, h t n abutting y6ur pr6perty.*'Thb,- mprovem"i" 0 sid6�a need of repair at the expense of the abutting property owner is provided by City Ordinance, Chapter 7.20 and Revised Code of Washington, Chapter 35.68. The areas needing repair have been marked in paint on the sidewalk adjoining your property. Reconstruction and repair of these sidewalks must be completed on or before September 1, 1981. In the event improvements are not completed within the above specified time, the City will perform and complete the improvements at-, the expense'of the. abutting property owner. This action is in response to many citizen requests and pedestrian falling accidents which have been increasing in recent years as a result of sidewalk deterioration and increased pedestrian traffic. Sincerely,, FRED F. HERZBERG I Director of Public works CITY OF EDMONDS — — — — — — — — — — — — — PUB13C WCM — EN03INEERING ,,ACTION REPORT SUSPENSE DATE: i 'T k;"! 3391 )ate:- ZK Time: 2 File # Attachments: =Yes No 3UBJECT: '--Z,/- 1EL1,71 o 4. Teze 7- 1EQUESTOR: AE : A//,75 - /:-� /,-- -, E- /k/ r-) 6�yL- ADDRESS: 1.:��7. & C.X- PHONE- -741- ZEQUEST RECEIVED BY: TELEPHCNE CONTACT IN OFFICE-pm�� OTHER: AECEIVED BY: zc-:. /z'/ I m M OMM 7�4, All Concerned Notified Action Completed/File 21TY OF EDMONDS PUBLIC WCRKS — EMINEERIM ACTION REPORT SUSPENSE DATE: Da te: zir, Time: 2-* 20-'�N- File # Attachments: SUBJECT REQUESTOR: NAME: /&S. ADDRESS: Pe. e4l;� 414 PHONE: Z 7-4 - 4 f3 7V-- REQUEST RECEIVED BY: TELEPHONE CONTACT IN OFFICE-P�!r— OTHER:_ RECEIVED BY: onilTr TA. N9 3391 =Yes =No ACTION: ,Y;,f All Concerned Notified Action Completed/File CITY OF EDMONDS 250 5th AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES May 12, 1986 Mrs. Friesendahl P.O. Box 414 Edmonds, WA 98020 RE: REQUEST FOR LOADING ZONE @ 551 MAPLE STREET Dear Mrs. Friesendahl: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR After a field review of the site and existing conditions, I would not be inclined to establish the requested parking restriction. The reasons are twofold; on -street parking is at a premium throughout the core area, and it appears that an alternative off-street access exists from the alley. The lack of a clearly definable and enforceable time limit for said loading zone further compounds the situation. Should you have any questions regarding this matter, please.call me at 771-3202, ext. 264. CB/md ? �/�2 C;iidLa Date Sincerely, Chris Beckman, P.E. Engineering Coordinator Chris Date PUBLIC WORKS PLANNING PARKS AND RECREATION 0 ENGINEERING L�� Mr. E.D. Phillips Phillips Concrete Specialties c/o R & R Coins Box 1022 Lynnwood Washington 98036 Dear Mr. Phillips: W E�o January 28, 1970 Returned herewith as enclosure "111 is your check in the amount of $100.00 which was posted with the City of Edmonds in lieu of a restoration bond for the sidewalks construction for the First Church of Christ Scientists. The work has been completed satisfactorily to the City of Edmonds; and therffore, your check map be released. Yours very truly, ciTy or EDMONDS Lar R. LARSON City Engineer rf Enclosure "Mok November 12, 1969 First Church of Christ Scientist Board of Directors Sixth and Maple Streets Edmonds, Washington 98020 Gentlemen: It is our opinion that Lased upon the present water -load demand of your new structure a 3/4-inch water meter and service line would be of sufficient capacity to meet these requirements. Respectfully, CITY OF EDMONDS RONALD L. WHALEY Aset. Director Of Public Works RLW: eu FIRST CHURCH OF CHRIST, SCIENTIST 551 MAPLE STREET EDMONDS, WASHINGTON 98020 No vem6eA 7., 1969 CZty Of &Wndd 606ndbdy %4&:%�n Attention: MA. lqonaJd WwUey, 10ub.&c iMmAd 'oi4e C,4011 &aA SiA.- The BoaAd of DiAectow of Fim..4. ClwAch of C"4 Sc-Lentc4-1, &6" AeqLw-4.t4 Aa-t Ae Ct.�y of 6&wndd .,zejwve 41m one and one-Aa-4 - 1 112" nze-teA mi 551 Alajnx�e SiAee-4 &wndd.. and, if po-i-jib-ze give U4 "edit �6,4 Ae pnice of ;dw me-ieA. Any �a6vA codt to the Ci;ty in Ate Aowva.,l mU be pa� 6� Ae &utAch. N! find Aa� Vw 314" me;tet i4 .4ufliaeq,4 /o,.z otm rwApo-de. Ve-4y -44ay YOUA4y La.Vida AaAl C.1elth "RD OF Dli�fCT01'6 RECEIVED NOV 111969 FIRST CHURCH OF CHRIST, SCIF' T 551 Maple EDMONDS, WASHINGTON 98020 4t/ P ml U) )OV .9 N ov M/4 Abnold ghaley PUbAC #bAd &Aectolz Xo &u&it Rmee-i KtVU Lb 1 114%j U .REQUEST FOR PURCHASE. Dept . ..... j5p.-Issrel.r1k ................ A ........................................ . ............. TY-1d, EDMONDS Firin L Date ... . ... 5.e ;.,;j -- ----.... 19.6.9 ... Reid. Middleton & AsSOC.i.a.t.e.s- ................................... Confirming Order Price: ............................... . ................. . ............................. .................... Yes El No . .............................................................. 324 Main Street Price: ............................... . ................. . .. ..... . .. . ............................................ iiii PURCHASING DEPT. USE ONLY Edmonds, Washington 98020 C . ....... . ..................................................... ......... . ....................................................... ............ . ................................................... Purchase Order No ....................................... Price: .................................................. PhoneNumber ........ 8.-,.1.1.7.1 ........................................... ........................ Ordered: ......................... ............................ Quotes Received By: ... . ................... Order on open market Sufficient Budget Balance DeliveryBy: ............................................... . ......................................................... YesNo D El ............................ �io . y . se ............................ Quantity Description Item Code Est. Price Quoted Price Engineering services in connection with check. 19.234 ind sewer elevation for church on 6th & Map I hr. @ $14.00 $14.00 34 hra- (a ln-nO 15-00 2 hrs. @ 24.00 48.00 —2 mi- . Total .29 $97.20 File No. 1.720 Authorized By City Supervisor: . . ...... . ........................................................................................... ............................................... .. .... . .......................................... LEF R. IPRSON.9 CITY ENGINEER J CITY OF EDMONDS No. ........................... ...... Al 4 11 r To .... R.E.1-D., .... MI.M.LETON ... & ... A.S.SOC.I.ATESO ---- I.N.C.... .... ..... ............ .................................................... ...... 9.8.02.0 ......... .......................... As Per Bill Attached Hereto AMOUNT DATE iG. 26, 1969 ENGINEERING SERVICES IN CONNECTION WITH CHECKING SEWER ELEVATION FOR CHURCH ON 6TH AND 14APLE: 1 HR. @ $14.00 3J HRS. 0 10.00 2 HRS. @ 24.00 3 4 5 8 2 .10 20 9 7 20 FILE No. 1.720 APPROVED: A A^-L -A D!�9 1, the undersigned do hereby certify under penaltyof perjury, that the materials have been furnished, the services rendered, or the labor performed as described herein, and that the claim is a just, due, and unpaid obligation against the City of Edmonds, and that I am authorized to authenticate and certify to said claim. f, (D "City Engineer Signed......... -------------------- ......................... .............................................. Title CITY OF EDMONDS _Rt.l.p.s. . -.M1jRq4XTq;! ... .... 3.2 ..4-14AN ... S.T.RK91 .................................. ............. u. 98020 Epmqt4.pAs ... WA .............................................................. 07..-20 ........................ Department or Fund 11 AMOUNT BUILDING DEPARTMENT CITY CLERK CIVIC CENTER CITY SUPERVISOR FIRE DEPARTMENT IJBRARY MAYOR & COUNCIL PARK ENGINEER POLICE DEPARTMENT ANIMAL CONTROL POLICE COURT PLANNING COMMISSION PRINTING & PUBLISHING RECREATION STREET LIGHTS TREASURER WATER DEPARTMENT WATER OFFICE DISPOSAL PLANT POWER FOR PUMPS STREET DEPARTMENT STREET ARTERIAL EQUIPMENT RENTAL L. 1. D. No. SALARY FUND' MECHANICAL CONTRAC I N 0 0 0 R CLIMATE CONTROL September 39 1969 City of Edmonds Edmonds, Washington. Gentlemen: L L Attention: Ronald L, Vialey kssto Director of Public Works Re., First -Church of Christ 551 Nple Street, Edmonds, Wpshingt*n 'Ub received copy of your letter dated August 28, 1969, addressed to First Christian Church, pertaining to our deposit with the City of Edmonds of $550.00 for installation of water meter at this project, and a finAl credit of $72,R 'rkbile the water service was probably registered in our name, we have no responsibility for the payment of water bills* It is our understanding from the Specifications that the Generml Contractor will furnish temporpry water service. Vb belbve also that the Owners will assume obligations for the payment of water service on their occupancy and use of the premises, Accordingly, by copy of this letter to C.B.S. Construction Company, the General Contractor, we are forwarding herewith to C.B.S. Construction Company one bill received from your department In the amount of $3.00, for water use during -the period 4/24,69 - �/6-69, for their payment to you. 'We received no other bills for utilities from the City of Edmonds, 14b also ask you to mail us your check in full for $79.62 since we have no responsibility for the payment of water service., either during construction or after occupancy by the Owners. Please also ahsnge the registration of the service from our name to thpt of the Owners, Yours very truly,, INDOOR CLT ONTROL., INC. B Y Tor Berg cc: C.B.S. Construction Compsny 11205 Greenwood Avenue North Senttle, Washington 98133 cc; PIrst ChristiRn Church 551 Tipple Street Edmonds., Wpsh. 98020 GENERAL OFFICES AND FACTORY LOCATED AT 2310 S.W. SPOKANE ST. SEATTLE, WASH. 98106 TELEPHONE WE. 7-8210 August 26, 1969 First Christian Church 551 Maple Street Zdawdso Waxhington 98020 Fe: $550-00 Depovit Made by Indoor Climate Control, Inc., 2310 S*W. Spunke Street, Seattle 28106 -- For 1-1/2" Water Motor Installation C,, 551 Maple Street, Edmonds Gentlemen: The following Is the billing for the above captioned install&- tion, which also included augoriag under the street to install the 1-1/2" water service line for sames WATER DLPARTMUT Materials Labor AuSor Machine Cyorhead State Sales Tax Sub -Total I EQUIPMENT RLNTAL FUND Equipment Rental Overhead 200.70 120.00 50.ou 370.70 37.07 407.77 18.35 $ 426.12 38.50 3.85 $ 42,35 State Sales Tax 1.91 Sub -Total II $ 44.26 TOTAL CHA M S 470.39 L L S S D L P 0 S I T 550.00 TOTAL CREDIT ON 551 MAPLE ACCOUNT $ -79,62 - continued - First Christian Church August 28, 1269 Page Two The foregoing work was performed by the City of Ldmonds Water Department an Work Orders No. 2259 and 2272. which had required an estimated $550,00 deposit for the performance of same. As you will not*, there is a credit reflected an subject job. This credit will be applied to the water account of 551 Maple Street. Edmonds, and will appear on your water bill until it is absorbed. Should you have any question re- garding this matter, ploaso do not hesitate to contact no. ft"etfully yours,, CITY Or LDNO*DS RONALD L. WHALLY Anst. Director of Public Wovk* RLW t tu cct Indoor Climate Controlq Inc. 44, Atiguat 289,10,09 'Navo to Orot 'y'Dr6brery -Water Billing zk I Dotty�, Knlr,,ht'*� Vater Dept - 'R vokk, ooep *r j �md Mary go 0 r ,quipsaont R ntAl fsot�kk VIP I v Roiald jL.- Adhoklettv Ass,t!. tDlractor, of, Public Works -Subjicti��'.,,,$550.00 Woci�jt Made by Indoor Climate, ontr6l, Ina. 2310 S.W. Spunke Etreat eat ttle 98106 ror 1-1/211 Wator Uter strea ti;, had is a copy of a billing (above Captionid), t�at` is I t��-) uniqlas It, hu,;a' credit balance. Tills will please vla' customor but mny present �,a tau challenges to, our . jo%)s iratoadw 'in other words 4 tramsfar, Of funds $44.16).should b0ivAde frcm the Water De* partment to the Eqquip� mopt Rentia: F�nd �for cervices obtained and'the water account for 451 t1aple Street, is t6,, have a"$79062 predit applied,to 3 am* until'absorbed. Please ith, chilck, w tw h any rob s oUld lems &rise in carrying ou the,'f cre oing. AL vi qi 1 4&, First Christian church 'August,28' 1909 Pace Two The foregoing work. wa's perfom*d by the City of Ldmouds WatQr .,,Department on Work Orders No. 2259 and 2272, which had rcquixe 4 an estimated $550.00 depo it for the performance of scre. A3 YOU Will notel there is a credit refloated on subject job. This cralit will be epplied to the water account of 551 Maple Gt"et, Edmonds, and will appemr on your water bill until it is absorbed. Should you have sty question m- garding this viatterg ploass. do not hesitata to contact ma. Respactfully yours CITY OF EDMUNDS ON. r ALD Lo WHALEY tast, Director of Public Worki ect Woor ClimatelControlt Inc. *z' 4v CUUIICI.0 1, J" '2114G Jubi-1, 17, 1969 INM S.,!;T H.;A-aiING J.0-� ON iILAii'h'IXiG COI4Jz)oMi A.JjULU'2IiN 14 Planning Coiawission Aesolution �314p recommending an amendment to the zoning ordinance for general requirements for Planned Unit Developmentav was presented for.a council hearing datev and it was moved by Councilman Haines, seconded by Councilman Nord�juist that -august 5 be set as the date for hearing before council on illanning Commission Resolution ,--314. hotion carried. INVITATION TO CUUNCIL fIlOi-i COLIJiSION ,,n invitation was extended to'the council from the Planning Comuission to attend a special meeting on June 25 at 8sOQ dealing with the waterfront question. FIR"4URKS �)TAIQ P_2idTS A letter was read frota Fire Chief Oooper recoLiuending approval of the fol lowing per- mits for fireworks stands for the 4L, of Julyt Thunderbirds Drum and Bugle Corps 2005 9�4 avenue S. Tenth ,)uorum of -Aders 1640 9:L2 itvenue S. Edmonds Jaycees 9A avenue and i-;dmonds Way A motion was made by Councilman Nelsont seconded by Councilman Nordquist that the above fireworks stands permits be approved. hotion carried. 12_md'-ieURj-�RY C Q*A C h; oS I u 1� 11 _�Ai iI -2 6 Applications for temporary concessions for the 4.L- of Jul.:. were presentedg for the American Legion -.uxiliary to sell pop corn, cotton candy and coffee located at Urner's Shoe Store 420 iiaint the City i?ark, and the north and south side of the ferry dock; and the Sno-King Lady Lions (proceeds to benefit activities of the blind) for balloons along the parade route. Councilffian Tuson made a motion, seconded by Council- man iiordquist that the temporary concession aSreements for the ,.merican Legion Auxil- iary and the Lady Lions be approved. Ilotion carried. COA�t'�J.eUi'DZd'.`C;j A letter was read from John J. Deer, 7205 28L� ive. N.-I., 6eattle. Pir. Deer asked for 2 hour parking signs to be placed in front of his apartment building across the street west of the Post Office between illain and Bell 6treets. 'Aiis was referred to the Chief of Police. A letter from 1-irs. Chas. W. Beilke was reado requesting the permanent closure of the street through the Chase Lake School, and sugaested if the Police or z'ire De,)ts. needed 4 key to open the.streetv they would be willing for them to have this arrange- ment. Both the �'ire and eolice Ciiiefs were present and voiced no objection to the closure of this street with a chain gate and key available. Councilman Sennett stated he did not feel the council should permanently block this street before a long look is taken into the situution. Ray Loore, a resident of that area, complained of the street being used by cars for a raceway. Ae said that the street presented prob- lems after school hours, not when school was in sessiont and that the safety of chil- dren living in that imuediate area was jeopardized by this street remaining open after school was closed. Bob Aacker stated that he was interested in having the road closed and chained. There was a great deal of discussion on the subjectf both in the audience and from the council. A motion was made by Councilman Bennett, seconded by Councilman Haines that the street that runs east and west on the north side of the Chase Lake �lementary School not be permanently barricaded or closed. A roll call vote was taken, with Councilmen Bennett and r1aines voting in favor; helson, Tuson and i�ordquist against and the motion failed to carry. A letter from. Dan ,,nderseng 800 - 12� avenue S., complained about the condition of the road8 in Mwonds and Bowdoin day in particular, and asked what the ci.ty proposed to do about it, hayor Harrison noted that Bowdoin day was on the priority list for arterial approval. A letter was read from Fred S. !.,eserve,'Chairman of the Board of Directors of the First Church of Christ, 6cientist. Ae stated that the cost of furnishing * a perform-) ance bond for installation of required paving and drainage system in thOir parking. COUNCIL MEETING MINUTES JUNE 17, 1969 -3- area and connection within six months from time of completion of a permanent storm sewer in the immediate vicinity of the church property would be a burden upon the congregation. They requested consideration of the waiving of the required perform- ance bond. It was estimated by council that a bond for 05000-00 would probably cost approximately ;�50-00 per year. Following some discussion, it was moved by Councilman Bennett that the city not waive the required performance bond, and this motion died for lack of a second. It was then moved by Councilman Haines, seconded by Councilman Tudon that the city require the church to maintain a performance bond for a period of one year, and then the council could review the circumstances at that time. Motion carried. ? Two letters, one from Police Chief Grimstad and one from Fire Chief Cooper, were received in regard to 751� Avenue W. as it runs along the area in north Edmonds near the water. It was stated that this narrow street needed parking limitationso and both Chiefs Cooper and Grimstad advised allowing parking one side only, preferably on the west side. It was moved by Councilman Bennett, seconded by Councilman Nelson that an ordinance be prepared pursuant to this request. Motion carried with Council- man Haines abstaining, since his property abuts this area. A letter of resignation as Director of Public Works was read from John Moran, who has accepted a similar position with Cowlitz county. Mayor Harrison noted that the position of Director of Public Works would not be refilled at this time, pending results of the study presently being made by the professional management consultant firm of Harry J. Prior & Associates. It was moved by Councilman Nordquistp seconded by Councilman Haines that the resignation be accepted with regret and a Resolution be prepared commending John Moran for his service in the employment of the city. Motion carried. AUDIENCE PARTICIPATION Representatives from the newly formed organization called PRIDE were in the audiencep and Mr. Mueller, one of the members, mentioned that their newsletter and a copy of their goals had been received by each councilman. He added that the organization wished to be of help to the city in any way it could. A gentleman in the audience asked a question concerning overlays put on streets to patch following installation of sewer lines. Another gentleman in the audience brought to the attention of short cycle for the green traffic light when travelling north intersection. This problem was to be looked into. COUNCIL PARTICIPATION council the unreasonable on 919 at the Westgate Because of the extreme heat and uncomfortable conditions, Councilman Bennett made a motion that they strike the council participation section for this evening. This motion died for lack of a second. Councilman Nelson suggested that the Police Dept. and City Engineer take an additional look at the holding lane situation on Sunset Avenue for the ferry traffic. Councilman Haines inquired if the ferry system had been contacted in regard to the necessity of the city having extra patrolmen on duty due to the ferry traffic. Mayor Harrison answered that he had called the Washington State Perry system on this mattert and that they did not seem too enthusiastic about being responsible for the extra patrolmen needed, but they had admitted that they used and paid for off -duty policemen -at the Coleman dock in Seattle during rush ferry traffic, but explained that was a different situation. Councilman Haines made a motion that an accurate account of the man hours spent be tabulated, and billed to the ferry system for that amount.. Mr. Ted Chittenden, Port Commissioner, was present in the audience and re- minded the council that there was a proposal for expansion to double the size of the present ferry dock to eliminate the holding lanes on city R/W entirely. Councilman Haines amended his motion to eliminate the billing to the ferry system, and merely advise them of the extra man hours used and paid for by the city. This amended motion was seconded by Cuuncilman Bennettq and carried. Councilman 'Tuson stated he thought that because of the condition of some of the streets with a Present 35 mph speed limit, a change to 25 mph was in order, and he " I 0 MEMORANDUM Date: January 3, 2000 To: Edmonds City Council From: Maryanne Zukowski, Traffic EngineerA Subject: Loading Zone Request The Engineering Division has received a written request for a loading zone from the First Church of Christ Scientist located at 551 Maple Street. The written documentation for this request is enclosed for your review and comments.. - I will initiate* a work order for Public. Works to create the requested loading zone unless I hear objections by January 18, 2000. City of Edmonds Development Services Depa ent Engineering Division FIRST CHURCH OF CHRIST, SCIENTIST 551 MAPLE STREET CHURCH: 425-778-4007 EDMONDS, WASHINGTON 98020-3434 READING ROOM: 425-778-3553 December 19, 1999 City of Edmonds ATTN: Mary Ann 121 — 5th. Ave. N. Edmonds WA 98020 Dear Mary Ann, I received your telephone message this morning requesting a copy of the letter Clyde Dimmick presented to you. In attempting to review your message, I inadvertently pressed the "Delete" instead of the "Repeat" button before I was able to write down your last name. I've inclosed a copy of the original letter. Thank you for your assistance in this matter. Sincerely, The Executive Board Paul S. Bishop Clerk FIRST CHURCH OF CHRIST, SCIENTIST 551 MAPLE STREET CHURCH: 425-778-4007 EDMONDS, WASHINGTON 98020-3434 READING ROOM: 425-778,3553 December 1, 1999 Mr. Clyde Dimmick 213 Elm St Edmonds WA 98020 Dear Clyde, This is the information you requested about the use of the DART public transportation system. It is used by Patricia Wurn who regularly attends our services and lives at the Aldercrest Nursing Home at 21400 — 72nd Avenue West in Edmonds. She is brought to our Church by a DART van with a hydraulic ramp which lowers her wheelchair to the sidewalk where ushers greet her and wheel her into the Church. Sincerely, The Executive Board � - e'X-1 � Paul S. Bishop Clerk Item COUNCIL COMMITTEE MEMO Committee: Community Services/Development Services Meeting Date: January 11, 2000 Subject: Loading Zone Request — 551 Maple Street From: Jim Walker e�t Mayor: Comments: Council requested placement of this item following receipt of the attached memo. Currently the City has no established criteria for placement or establishment of loading zones. The Traffic Engineer believes that a loading zone would be appropriate in this area since there are no other loading zones in the vicinity. The procedure for establishing loading zones is established in the Washington Model Traffic Ordinance which was adopted by the City in 1976. Section 46.90.265 (14) authorizes the Traffic Engineer, "To determine the location of loading zones, passenger loading zones, and tow -away zones and shall place and maintain appropriate signs or curb markings supplemented with the appropriate words stenciled on the curb indicating the same and stating the hours. during which the provisions of this chapter are applicable." Affachment City of Edmonds MEMORANDUM Date: January 3, 2000 To: Edmonds City Council From: Maryan . ne Zukowski, Traffic EngineerA Subject: Loading Zone Request The Engineering Division has received a written request for a loading zone from the First Church of Christ Scientist located at 551 Maple Street. The written documentation for this request is enclosed for your review and comments. I will initiate a work order for Public Works to create the requested loading zone unless I hear objections by January 18, 2000. City of Edmonds Development Services Department Eneineerine Division FIRST CHURCH OF CHRIST, SCIENTIST 551 MAPLE STREET CHURCH: 425-778,4007 EDMONDS, WASHINGTON 98020-3434 READING ROOM: 425-778,3553 December 19, 1999 City of Edmonds' ATTN: Mary Ann 121 — 5th. Ave. N. Edmonds WA 98020 Dear Mary Ann, I received your telephone message this morning requesting a copy of the letter Clyde Dimmick presented to you. In attempting to review your message, I inadvertently pressed the "Delete" instead of the "Repeat" button before I was able to write down your last name. I've inclosed a copy of the original letter. Thank you for your assistance in this matter. Sincerely, The Executive Board Paul S. Bishop Clerk FIRST CHURCH OF CHRIST, SCIENTIST 551 MAPLESTREET CHURCH: 425-778-4007 EDMONDS, WASHINGTON 9802.0,3434 READINGROOM- 425-778,3553 December 1, 1999 Mr. Clyde Dimmick 213 Elm St Edmonds WA 98020 Dear Clyde, This is the information you requested about the use of the DART public tran ' sportation system. It is used by Patricia Wurn who regularly attends our services and lives at the Aldercrest Nursing Home at 21400 — 72nd Avenue West in Edmonds. She is brought to our Church by a DART van with a hydraulic ramp which lowers her wheelchair to the sidewalk where ushers greet her and wheel her into the Church. Sincerely, The Executive Board Paul S. Bishop .Clerk "A Good Customer Is Worthy nf:71very Consideration" WESTERN UTIMES SUPPLY (0. 'joTA ' Waterworks, Heating & Industrial Supplies P.O. BOX 3524 5409 OHIO AVE SO. SEATTLE. WASH. 98124 ROckwell 2-7025 S EATTLE, WASH. 98134 elu ;e r:5 Al 0 1�1 '10 jolL.4-3- 4-1 4� 41- �m 7-7 AO* Aft September 25, 1968 Kirk, Wallace, McKinley As I* A. & Associates, Architects 2000 Fairview Avenue Last Seattle, Washington 98102 Re: First Church of Christ Scientist Edmonds,, WashinLton Gentlemen: The Umonds Planning Department has reviewed the above noted plan for con- formity with the Edmonds Zoning Ordinance and Variance Application V-27-67. In September, 1967 the church requested a variance from the parking require- ments of the zoning ordinance. The building plans presented by the church at that time showed a seating capacity of 2SO seats. For this number of people the zoning ordinance requires 83 parking spaces (I parking space per 3 fixed seats). The Board of Adjustment acted favorably on this application and required that the church provide only 57 parking spaces for the 250 seat structure. The building plans submitted by your office now indicate that the seating capacity has been reduced from 250 to 200 seats. Reducing the parking requirement in proportion to the reduced seating capacity would indicate a revised parking requirement of 46 spaces, The proposed site plan is deficient by one space when correct parking space dimensions, as required by the Zoning Ordinance. are applied to the parking arrangement. A copy of the Zoning Ordinance provisions regarding parking lot development was given to a member of your firm about two weeks ago. This ordinance also requires the installation of a specific amount of landscaping and specific landscape items in conjunction with parking lot development. It is requested that a revised site plan for this property be drawn and submitted to this department prior to the issuance of a building permit. If you have any questions regarding the parking lot provisions, please do not hesitate to call us. Marlin Logan City Planner MLsjt cc: W. J. Slabaugh, Bldg. Official Leif Larson, City Engineer