551 MAPLE ST.PDF11111111111111
12132
551 MAPLE ST
ADDRESS:
TAX ACCOUNT/PARCEL NUMBER:
BUILDING PERMIT (NEW STRUCTURE) -
COVENANTS (RECORDED) FOR -
CRITICAL AREAS: DETERMINATION: 0 Conditional Waiver E] Study Required E] Waiver
DISCRETIONARY PERMIT fl'S:
DRAINAGE PLAN DATED: I t
PARKING AGREEMENTS DATED:
EASEMENT(S) RECORDED FOR: —
PERMITS (OTHER
PLANNING DATA CHECKLIST DATED:
SCALED PLOT PLAN DATED:
SEWER LID FEE S: LID #:
SHORT PLAT FILE: LOT: BLOCK:
SIDE SEWER AS BUILT DATED:_
SIDE SEWER PERMIT(S).#:
GEOTECH REPORT DATED:
STREET USE / ENCROACHMENT PERMIT #:
WATER METER TAP CARD DATED:
OTHER:
L\TEMP\DSrsTomis\Street File Checklist.doc
PLANNING DATA STREET=FILE
- Signs -
Name: J'�f CVJL4rCho-� chh5+- 5cjen-hst
Date:
Site Address: 15-51 Pit, 51-yeef
Plan Check#: BLD-2007- 98�0
Project Description: Ntw m oviLA vo �w t �;, f 9 K)
Reduced Site Plan Provided: (Xj�P NO)
I Zoning:
Comprehensive Plan Designation: [)OVVVMVVVL__
Map Page: 0 '�7
(OTtt &V/
Corner Lot: ( OES NO) KAP171C.-
Flag Lot: (YES
,7 "0 eg i e�fi'vl 13
ADB File # (or date waived): &L?P W 0 ttAn
TOTALAreap Typeof
Type of
Sign
Allowed in
zone?
Matrix
conditions
met?
Allowed
area per
unit
Unit
TOTAL
sign area
allowed for
this sign
Proposed
sign area
Example
Wafl
wAnternal
illumination
Yes, with
conditions
Yes
I sq. ft.Ilineal
ft. attached
wa#
41 ft.
attached wafl
41 square
feet
20 square
feet
S, #1
moinualent
-ID 000A
e,X -
(-P tDtA 1)
L) ce"
D
lot,
301,
-9
Sign #2
Sign #3
TO TA L � Area for Tenan tlSite
Max Permitted:
Previous Total:
Proposed Total:
Height
SignType: M0VVVV1&V1J-
Max Permitted:
ActualHeight: 3011
Sign Type:
Max Permitted:
Actual Height:
Sign Type:
Max Permitted:
Actual Height:
S�yn Lighting
Sign Type: Y� U, Vy) eNJ
Proposed: No"e,
Allowed in Zone:
Sign Type:
Proposed:
Allowed in Zone:
Sign Type:
Proposed:
Allowed in Zone:
0 PLANNING DATA 0
[ STREET FILE 11
- Signs --
Sign,Colors
Proposed:
Acceptable?
Requires ADI3 Approval?
Sign Location
If freestanding and 3-feet or over (unless a fence) meets setbacks?
e Setbacks
Street:
F—*i d e:
M
�jde-
(W) D'
Rear- SlYeei
mT,
.
Actual Setbacks,
Street: --l-�ide:
—P��
e:
Rear:
LandscqpZV for Freestanaft!S��'!
Size:
Location:
Critical Areas Determination M
Study Required
Waiver
Other
Thi,q cvi�vi pDp5etl Dn J46 Wy-tjirf-
to Mntu�l C4,01Y19 coi 3 V1 c 47
Laoo(,�cCA,FM tWfM C2� Je C(C.? 67 I'OVI C4 VeCL,
LA v-j(:7L4 a Vit fD 0.(00,OL+57, ClYl
10601 CYWC.f?7' "d P104-
VVI V1 %(t<,,V1 ti,
Plan Review By: a",;,
,ei The City of Edmonds
APPLICATION
for
$WE SEWER PFZMW
NEW CONSTRUCTION C] REPAIRS
EASEMENT No.
.... 14
OwxER ...... ........ C_4 1,17-CONTRACTOR ....... ........................................... PER?M No(;iii4-
ADDRESS ........... M ........... .............................................. LEGAL DESCRIPTION: LOT BL()CK N . . ...... t621 ............................
I - - - A- -
uj
Ll
A
APR 2 S69
Approved:
CITY OF -EDMONDS
CIVIC C ENTER — WATER -a -SEWER DEPARTMENT Call PRospect 6-1107 when work
Is ready forinspedion. ANo Inspec-
tions Saturday; Sunday or holidays.) N2 it)
SIDE -SEWER PERMIT 2.65
ADDRESS... 551 Maple Street
.................................................. . ..............................................................................................
OWNER ..... Urst ... P! ph of Christ Scientist
. ............................................................. CONTRACTOR .......... Me.t.v.o ... Sevier
Perinission ' ' I " is ' 'granted .................. April ... 2.3 ..... 196.9 ... I for ........................ days to REPAIR or CONNECT a side sewer
with City.Sewers In accordance with application on- file and governing ordinances.
ATTENTION IS CALLED TO THE FOLLOWING:
NOTE No. i—The owners of the Property may obtain a permit to construct sewer in Id . e property line. A licensed Side Sewer Contractor must
be employed to construct side sewer in street area. Do not cover any posrtion of sewer before it has been Inspected.
NOTE No. 2—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
No. 3—,Top of side sewer must have at least 30 Inches coverage at property line and 12 inches Inside property line; minimum grade of 2%.
No bends in grade sharper than % will be permitted.
NOTE No. 4---Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for
failure due, to Improper work which may develop within one.year of completion.
NOTE No. 5--It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appur-
tenances except to insert the pipe Into the wye.
1 0
n n
I REID
MIDDLETON
April 19, 1989
File No. 21-89-002-001
ON -SITE STORMWATER DETENTION CALCULATIONS FOR
PROPOSED PAVING OF EXISTING GRAVEL PARKING LOT FOR
FIRST CHURCH OF CHRIST SCIENTIST
551 - MAPLE STREET
EDMONDS, WASHINGTON
EXISTING CONDITIONS
The existing parcel is developed with a gravel parking area,. sloping in a northwesterly
direction to an existing storm sewer system in the alley way.
The parking lot is divided into two parts; one paralleling the alley north of the
church building and the main parking area west of the church.
The longest distance to the existing catch basin in the alley is 207 ft. with an
average slope of 2.3%. Tc = 207/3.1(60) + 10 min. = 11 min.
Using the Everett rainfall intensity curve for 10 yr. design storm I = 1.85 in/hr.
Area of the existing parking lots = 12,196.80 sq.ft. or 0.28 acres /
Existing c for the parking area = 0.80
Q existing = c(i)A = 0.8(l.85)0.28 = 0.414 or 0.41 c.f.s.
Using the Y�anainen and Warren Method for simple system design the following
calculations are to determine the required volume of detention for this project:
Qo 0.41
0.90(0.28) = 1.63
T= J _2� —
-25 1.63 = 12.19 min.
Vs 3607 (12.19)
12.19 + 25 - 40 (1.63) 12.19 = 1,182.29 - 794-79 = 387.50 c.f./AcC
V total = 387.50 (0.90) 0.28 = 97.65 cu.ft.
19031 33rd Ave. kN., Suite 301
P.O. Box 6638
Lynnwood, VVA 98036-6638
206/775-3434
0 0
Onsite Stormwater Detention Calulations for
Edmonds First Church of Christ Science
April 19, 1989
File No. 21-89-002-001
Page 2
Sizing the Detention System
Required detention = 97.65 cu.ft.
12" pipe = 0.7854 cu.ft./l.f.
CB Type 1160" = 19.63 cu.ft./v.f. v.f. = vertical foot
CB Type 1 = 3.97 cu.ft./v.f.
Install 69 Lf. 12" hel. al. st. sewer @ 0.7854 = 54.19 cu.ft.
CB No. 1 Type 1160" 1.65 v.f. @ 19.63 = 32.39 "
CB No.2, 3 & 4 Type 1 total V.F. = 4.57' @ 3.97 = 18.14 "
Total Volume Provided = 104.72 cu.ft.
Volume Required =-M65 "
Excess Provided = 7.07 cu.ft.
Sizing the Discharge Orifice
Q allowable = 0.41 c1s. Using the Orifice equation Q = cdA -f2—gh
Solving for A 0.41
0.6276TW(I-.6-5) 0.0642 sq.ft.
Use 3 3/8" orifice with A= 0.0621 sq.ft.
Ir:GEP:lSTCHRSC.ARM
RECEIVED
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
OWNER NAM /NAME OF/BUSINESS
MAILING ADDRESS
J
Cl TY ZIP TELEPHONE
NAME
ADDRESS
CITY ZIP I TELEPHONE
NAME
ADDRESS
CITY
ZIP
TELEPHONE
STATE LICENSE NUMBER
EXPIRATIONPATE
CHECKEDBY
L
PROPERTY TAX ACCOUNT PARCEL NO
F-1 NEW
RESIDENTIAL
n ADDITION
COMMERCIAL
C] REMODEL
APARTMENT
REPAIR
0 GRADING CYDS
DEMOLISH
[3 TANK
GARAGE
0
RETAINING WALL
1:1
CARPORT
PrirwPPv
(TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN
PLUMBING/MECH
COMPLIANCE 08
CHANGE OF USE
SIGN
FENCE
( — X
OTHER
RENEWAL
NUMBER NUMBEROF CRITICAL
OF DWELLING AREAS
STORIES UNITS NUMBER
DESCRIBE WORK TO BE DONE
HEAT SOURCE I GLAZING % . I ' LOT SLOPE %
FT)
PLAN CHECK NO: VESTED DATE
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO
t BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC
DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
PERMIT APPLICATION: 180 DAYS
0. PERMIT LIMIT: 1 YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION
W "APPLICANT. ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS AND SUCCESORS
U)
W IN INTEREST, AGREES TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY OF
_1
2 EDMONDS, WASHINGTON. ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARISING DIRECTLY OR INDIRECTLY
x FROM THE ISSUANCE OF THIS PERMIT. ISSUANCE OF THIS PERMIT SHALL NOT BE
0
—i DEEMEDTO MODIFY, WAIVE OR REDUCE ANY REQUIREMENTOF ANY CITY ORDINANCE
0 NOR LIMIT IN ANYWAYTHE CITY'SABILITYTO ENFORCE ANYORDINANCE PROVISION."
I HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THE INFORMATION
GIVEN IS CORRECT., AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
SIGNATURE (OWNER Op'�GENT DATE SIGNE9,"
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
CATE OF OCCUPANCY HAS BEEN GRANTED. UBC SECTION 109
�10.
PERMIT EX131RES
USE PERMIT
ZONE NUMBER
JOB SUITE/APT#
ADDRESS
PLAT NAM E/SUBDIVI SION NO.
LOT NO.
LID NO.
LID FEE $
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP
TESCP Approved
RW Permit Required
0
0
Street Use Permit Req'd
0
EXISTING — PROPOSED
Inspect:on Required
0
Skle��a k Required
0
REQUIRED DEDICATION— FT
Underground
r ng requir
0
METER SIZE
LINE SIZE
NO. OF FIXTURES
PRV REQUIRED
YES 0 NO 0
Lu
REMARKS
z
z
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION CONTROUDRAINAGE
0
_51AA1 (F,��57 T/, Z t ze
z
W
,;,w, AJ
ENGINEERING REVIEWED/DATE
FIRE REVIEWED BY DATE
VARIANCE OR CU
SHORELINE OR ADB#
INSPECTION
BOND
1) k6 — 2 -7,21)
REQ'D
POSTED
I
0 YES 0 NO
SEPA REVIEW
SIGN AREA
HEIGHT
COMPLETE EXEMPT
ALLOWED PROPOSED
LOWED PROPOS
AL ED
I
( 11 11
EXP
LOT COVE RAGE
REQUIRED SETBACKS (FT.)
PROPOSED SETBACKS (FT.)
ALLOW,ED
FRONT SIDE REAR
FRONT UR SIDE REAR
/PROPOSED
/A
10,
1 -zirl /V
z
z
PARKING
LOT AREA
PL�NNING REVIEWE9'BY,-* DATE
_j
REO'D _I PROVIDED
I &V,
a.
Lh.,
CHECKED BY TYPE OF CONSTRUCTI0777CQ�,D�,_ OCCUPANT
GROUP
SPECIAL INSPECTOR JAREA OCCUPA4T
REQUIRED E] YES LOAD
REMARKS a
PROGRESS INSPECTIONS PER UBC 108/FINAL INSPECTION REO'Dj i K
15
1:10
VALUATION I FEE
PLAN CHECK FEE
BUILDING
PLUMBING
MECHANICAL
GRADING/FILL
STATE SURCHARGE
ENG. REVIEW FEES
I V
ENG. INSPECTION FEE
LANDSCAPING
INSPECTION FEE
PLAN CHECK DEPOSIT
RECEIPT,
I /
TOTAL AMOUNT DUE
CALL
FOR INSPECTION
(425)
771-0220
EXT/333
771-0221
FAX
/ � '-16,,
IPT7;,
APPLICATION APPROVAL
This application is not a permit until signed by the
Building Official or his/her Deputy: and Fees are paid. and
receipt is acknowledged in space provided.
zFICIALS SIGNATURE DATE
ELEASED BY .,,bATE
V
ORIGINAL - FILE YELLOW - INSPECTOR
PINK - OWNER GOLD - ASSESSOR
�A'� o. q2,�� - 771- 022
OATE', ID - 2 — 07
rz -0
Lg
C Z
Cz
0
00 �j
6 , it]
P mo
0
1%j
132006 Edition IRC W/WAC Amendments
02006 Bdition JBC W/WAC Ameadwab
132006 Edition UpC W/WAC AmmdmeM
lind APPWdic4is A, B, 0 1
132006 Edition IMC w/WAC Anwn&nents
132006 Edition JFGC w/WAC Anwr
Ahr
132006 Edition wc w/wAc Amendme seats
132006 Edition VIAQ WAC 51-13 ab
C32006 Edition WSEC WAC 5 1 -11
-D)v
i -T Y ()r C,- 0 m () m ?1 5 PLAN t� I m
A Wl CZY) A �-h*Oyl�>
APP13OVED BY PLANNING
tMMIlk..' (,,497,f A A,- i r)
SIGN
4�"
-7
Ckrot)4"ar) Science Gurck
00
co
(j)
n
'Jim
�-,PPROVED AS NOTED
0 BY ENGINEERING
-Pllj� I
-d�a - —
Date: --# �11
RESUB
OCT 10 2007
BUILDING DEPARTMENT
CITY OF EDMONDS
r )PQ-17.-S c/- 7)9a)
- -) 1,0REET FILE
------- -----
R�-A CHRiSTIA-Nt SCIENCE
C H U R C H S E R v i
C E S
A// A T*lcom(,
StJndaY Service 0:00 am
-4c Sunday School 10:00 am
Wednesday TLstin)o,
y M16-ting 7:
30 prn
RE!ading Roorn 120-C Sth
Ave, S
j�
1-9
w,
3P
. ."=
- OP:L
9
, 2s
"Ain:
VAX-
317.o
jN
Iv
te
SIX )ApWlh(f AWAF -
(7,Y)M,- wlr#
Z, ao i 0; rj W(o 0
LROM040'm
0
24
0
se,4z,, - Ye - = / If
ON A lfdlw"
0 L
4
2q 0
m , , div
6t 4,40
(i) ID rh
Zone Come�—/fla&__
Setbacks Required Actmal
Front
Sides
Rear
Other
Heiwlt
080000 0/(- 0 Q
a a V-4 10
IV �8"--00
-O^W
A' 'fe 0.14L.' ANW-1
CHR15TIAN SCIEACf- CRUPOA
RECEIVED
P-3 -NCYFED
SEP 2 8 2007
pY EPGIMERINCA
BUILDING DEPT.
D, ee:
SlKtE
T FILE
� (1/- 5 7�
Yll"'I'di
RECEIVED
SEP 2 8 2007
BUILDING DEPT.
STREET FILE
10 LF. 6" SCH. 40
PVC 01) 1.0%
CB No. 4 TYPE 1
30 LF. 12' . (a-)
TOP 94.80
0.50%
9 LF. 12" (dD
IE 93.1 Q
0.50%-
'1�
9 .77
3.60%
CB 94.53
Lo
6' -
INV. 92.93
CB TOP'-o---
A 9532
91.60
pp
INV. E G' T.O.W.
90.41
98.327
INV. N\� 8"
89.95 PLANTER
CB No. (TYPE 11 60")
TOP 96.50
6" IE. 93.03
12" IE. 93.03
(SEE DETAIL)---
T.O.W.
...........
....
100.83
................
..... .........
........ ....
....... .
. ..........
mm -
T.O:W.
100.73--//
PLANTER
I
PLANTER
101.01 IOLIT 101.36
PLAN"i 11�7MATCH EXISTING BACK
OF WALK WITH NEW
SURFACING
j
SLOPE
REMOVABLE END
CAP WITH NEOPRENE
GASKET-------'
3 3/8" ORIFICE
SHOP DRILLED
IN END CAPn----:/4,
CB No. 2 TYPE I
TOP 95.50
IE 93.08
30 LF. 12" (cD
0.50% CB No. 3 TYPE I
TOP 96.20
IE 93.23
17)0 96.50
IL COA ROCK SURFACE B
96.20 pp _40
PLANTER
STAIRWAY
cr_
w
z
-i
CL
PLANTER
101.49
--BACK OF CONCRETE WALK
PLAN
SCALE: I"= 208-0"
SOLIDLOCKING LID
TOP 96.50
I F-A W�',
1C..11 '93.03 �l
qll z
CB TYPE Ill 60" ID
%
DETAIL - CB No. I
SCALE :
96.90
RIGHT-OF-WAY
CONCRETE WALK
STAIRWAY
97.21
97.25
EXISTING CHURCH BUILDING
CONCRETE
WALK
RIGHT-OF-WAY
ul
PLANTER
PLANTER
MAPLE Street
0
98.68
ui I
(D
01
uj
I -VARIES
0.17' COMPACTED DEPTH
CLASS "B" ASPHALT If
CONCRETE( 2")
c_%
z
u
98.66
99.12
0
0
<
<
_j
a-
0
�L
T_
30'
__r
(.0
L-upiE 051- MATCH EDGE OF EXISTING
VARIES
SURFACE WITH NEW
PAVEMENT
-EXISTING OIL COAT
ALLEY SURFACING
COMPACTED AND REGRADED
EXISTING GRAVEL SURFACE 0.33' AT EDGE MATCH
DETAIL B-B ASPHALT CONCRETE
SURFACE DRAINAGE DIVERSION BUMP
SCALE : NTS
GENERAL NOTES:
1 . ALL CONSTRUCTION SHALL CONFORM TO THE "STANDARD SPECIFICATIONS FOR MUNICIPAL PUBLIC
WORKS CONSTRUCTION" AND STANDARD PLANS AS ADOPTED BY THE CITY OF
EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS PROJECT.
2. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS 24 HOURS
PRIOR TO AND DURING WORK AND OBTAIN ALL REQUIRED PERMITS PRIOR TO
CONSTRUCTION.
3. THE CONTRACTOR SHALL NOTIFY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS PRIOR TO
BACKFILLING UTILITIES.
4. EXISTING UNDERGROUND FACILITIES HAVE BEEN SHOWN ON THESE DRAWINGS FOR THE
PURPOSE OF ASSISTING THE CONTRACTOR IN LOCATING SAID FACILITIES IN THE FIELD. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ACTUAL LOCATIONS IN THE FIELD AND CHECK-
ING WITH APPROPRIATE AGENCIES THAT MAY HAVE UNDERGROUND FACILITIES WITHIN THE PROJECT
i
ACILITIES RESULTING FROM HIS OPERATIONS.
5. A COPY OF THESE APPROVED �PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION I IN
PROGRESS.
6. IT SHALL BE THE RESPONSIBILITY, OF THE CONTRACTOR TO CLEAN, FLUSH, DISINFECT WHERE
APPLICABLE AND OBTAIN SATISFACTORY APPROVAL FROM THE CITY OF EDMONDS REGARDING THE
QUALITY AND INTEGRITY OF EXISTING WATER LINES, SANITARY SEWER LINE, STORM SEWER LINE,
RETENTION SYSTEM ETC. WRITTEN ACCEPTANCE BY THE CITY OF THESE
PROCEDURES MUST BE TRANSMITTED TO THE DESIGN ENGINEER.
7. THE CONTRACTOR SHALL INSTALL ASPHALT CONCRETE SURFACE DRAINAGE DIVERSION BUMP
ADJACENT -TO ALLEY TO DIRECT SURFACE DRAINAGE TO CATCH BASINS AS SHOWN.
8. THE CONTRACTOR SHALL REbRADE AND COMPACT EXISTING GRAVEL SURFACE IN PARKING LOT TO A
UNIFORM SLOPE TO THE CATCH BASINS AS SHOWN AND DIRECTED BY THE OWNER'S REPRESENTATIVE.
w
LL
0
w
0
a
w
0' T 0 61
VARIES
0.17' COMPACTED DEPTH
CLASS "B" ASPHALT 1.01
CONCRETE
SLOpE 0.5'
VARIES
SLOpE
VARIES
COMPACTED AND REGRADED
EXISTING GRAVEL SURFACE
DETAIL A -A ASPHALT CONCRETE
SURFACE DRAINAGE DIVERSION BUMP
SCALE: NTS
7
a
,4n
z
0
w
ld
6
z
C 0
00
<
4-J
0
0
C 0
0 C 3:
c
Ln 0
0
V)
%.- Q)
C 0
0 >,
(1) w
4-J
0
-0 V-)
-0 >
pr)
0
c
ryo, LLJ
z
J
0. z
W 0
w
cl) Z
z
<
z
0
z
0
z
W
1. 0 LL w
W LLO
w Lu
w
I- <
u
cr.
0
I-
Cn LL
$CALK AS SHOWN
DKG' ARM SHIERT NO.
CH. JO
F.8
Q4/441 .1 1 SN"Te
DATX FEB. 1989
FILK
NO. 21-89-002
A, - 14W
Mme Tot Woll000 Slabsugh
A""Aft Davatmat
From O"m b"411
Inginoorift Departomat
subjeats NIX&t Church of Christ sousust
Fir"Osed Building an Maple, Avo=Ao
CO/It
$*Pt*Nbft 123, IM
16 a.PA* %* bViUUJAS plow for tho above wabloet, The
Dopavument r*qkdraments ago 40 folums
Ths 4114Y 10 to be Surfaced to a width of tw*lvo foot (12s).
2. Surface drainage is to be collected in cat4h ba*iuo in
the allay aad m in a tight line of sight inch (all) =in.
dia. to the existing atom sewer line in sixth AvWvAe.
I
0 n., "r
--amox— C)
9 0 - 1 9
f 1WA
Y
RIGHT-OF-WAY CONSTRUCTION
Perwit Number. L? _0
le,7 rt J Wue Date:
A. Address or Vicinity of Construction: _ 551 Maple St. (9320903)
B. Type of Work (be specific): Install NPTj Rpryire I' ut
C. Contractor: Washingt-on Nat'l. rag Cn-
Mailing Address: 815 Mercer q.t. Si-�attl P, Wn.
State License #: 98111
D. Building Permit#( - if applicable):
Contact: Frank Swan
Phone:
Liability Insurance: Bond: $
Side Sewer Permit # (if applicable):
E. [:) Commercial E] Subdivision [:1 City Project Rk Utility (PUD,.GTE, WNG, CABLE, WATER)
F1 Multi -Family EJ Single Family n Other
INSPECTOR: INSPECTOR: W
F. Pavement or Concrete Cut ig Yes []No G. Sizeof Cut: (1)2 x 4 H. Chargt�_$
CW,6/6 GAs
APPLICANT TO READ A_N GN
F f
INDEMNITY. Applicant understands and by his signature to this application, agrees &.1d tcee City ofEdmonds harmles)from i j,.), d3mages, or
claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or
employees, including or not limited to the defense ofany legal proceedings including defense costs, and attorney fees by reason ofgranting thispermit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIPAND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
'ORATION
INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESI *E4
BE HELD UNTIL �I
W_ AALTREETPATCH
IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROUEMED FOR ISSUANCE TO 7 1 WANT
Construction drawing of proposed work required with permit application.
A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut ditches shall be patched with asphalt or City approved 'material prior to the eifd-of the working day;
NO EXCEPTIONS.
Ihave read the above statements an d understand thepermit requirements and thepink copy of thepermit will be
available on site at all times for inspectionpurposes. 14
J
July Is, 1993
Signature: z6"'LiA �<;CO Date:
(Contractor or Agent)
CALL DIAL -A -DIG PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPRO VED BY:
TIME AUTttO,RIZED: VOID AFTER 9 -10- Oil DAYS
RIGHT OF WAY DEPOSIT
DISRUPTION FEE/FUND 111:..
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
Engrg. Div. 1991
FIELD INSPECTION NOTES (Fund ill - Route c6py to"Stre-et Dept.)
I Comments:
I Diagram.:
CONTRACTOR CALLED FOR INSPECTION El YES NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date: -
FINAL APPROVAL BY: Date: -
Addendum to City of Edmonds
Right of Way .
10,ft %* 4. % I %, 4.
AU
... Submitted by: Guyla Connors
Engineering Aide
Washington Natural Gas
521-5248
Jc)r3 -W
14, JN—s-PH,6�--7
I 'S '�) . I I
WPLE
WNG to window
Water main depth
gas main
-w-
water
-g-
gas -
-ss-
sewer
-e-
water hydrant
0
water valve
815 M=er St. (P.O. Box 1869), Scattic, WA 98111 (206) 622-6767
r
L
FIRST CHURCH OF CHRIST, SCIENTIST
CHURCH: 778-4007
August 28, 1991
Mr. Gordy Hyde
Engineering Department
City of Edmonds
250 5th Avenue North
Edmonds, WA 98020
Dear Sir,
551 MAPLE STREET
EDMONDS, WASHINGTON 98020
READING ROOM: 778-3553
Afecel V, Z.
Lo
AUG 3 0 199,
117VQ1/V'6�r1//V0
This letter is written as a follow-up to your recent telephone
conversation with Evelyn Bishop.
We are asking your consideration of our request that the City
Engineering Department paint a yellow line, approximately the
length of two cars, on the curb directly in front of the Maple
Street entrance of our church.
It is necessary that this space be available for our use on
Sunday mornings, Wednesday evenings and periodic evening
business meetings.
Sincerely,
The Executive Board
Mrs. Patricia M. Thornton, Clerk
C,f-' 13 �Sap.
eo" %oft
March 3, 1992
Mr. Gordy Hyde
Engineering Department
City of Edmonds
250 5th Avenue North
Edmonds, WA 96020
Re: 8-28-91 Request.from First Church
Dear Sir: of Christ, Scientist, Edmonds
I am writing relative to our several telephone conversations as well
as our original written request of August 28, 1991 for a yellow
line to be painted on the curb directly in front of the Maple Street
entrance to our church.
When I talked to you on January 27, 1992 you indicated that you
would check on this job. As you will recall, the curb was painted
adjacent to the parking lot driveway but not in front of the church
entrance as per our original request.
We will appreciate your assistance in the completion of this project,
as soon as possible. Thank you.
Sincerely,
h112
Evei B
i shop
7 - 83
78
Evelyn R.'iishop
633 Main Street, #203
Edmonds, WA 98020
D hP, 9� j
LJJ
2 B
4 NIAR
Gordy Hyde
.Engineering Department
City of Edmonds
250 5th Avenue North
IP& onds, 'iIik 98020
11111111dillif If fit 111f flit
P-
d 9 0 - I () 13 -
CO&ATION
CITY OF -EDMONDS ORDER'
CIVIC CENTER.� EDMONDS, WASHINGTON 98020 - (206) 775-2525,
EIPURCHASE REQUEST F�/_T
DINVENTORY REQUEST P�I WORK REQUEST
------
- ----
D,
THIS* NUMBER MUST,APPEAR'
'ON !XLL INVOICES,1'1.1�
PACKAGES, BILLS'OF, LADING,_
AND CORRESPONDENCE--
YERWRIPHO
DOCUMENT
NUMBER 12155
'013DER-DAT.E,
1_13,�TCH -DATE,
-7
PLEASE FURNISH THE FOLLOWING ITEMS:
114E4
I
�UNIT,
*�;,CATALC 1G`
' "'NUMBER--
DESCRI d
IMUNIT-
III[CQST
Tax COST,
ESTIMATED, ?�7 _u
- ---
JtDD)
- -- - -----
4�1-
P,> AEO P
REQUESTED BY:
4 &W
APPROVED BY -
RECEIVED BY-
0 "t
2
3
4
5
6
7
8
9
10.
12
Z
0
U
W
0
L1.
CITY OF EDMONDS , W Q �_"_'F'7 ,, 69-226
F Permit No.
COMMUNITY SERVICES DEPARTMENT L
RIGHT-OF-WA,'V CONSTRUCTION PERMIT Issue Date
B. 9 Contractor: �pi 6_
A. Owner: I C 10-1 fc(a
N!F_f Na
y &16 244
MaR,RtVdr6ss u)A Mailing Addr S
9s
t' fync'
61ty State Zip eity State Zip
State License Number Telephone Number
C. * Address or Vicinity of
Type of Work to be E
D. 0 Work in Connection With: El Sub or Plat 0 Single Family El City Projects
X-Commercial 0 Multifamily 0 Utility
E. 0 Pavement Cut: El Y *N F. Size of Cut: — X
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to. this application, agrees to hold the City of Edmonds
harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may
be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense
of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE
YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK.
Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be
processed for issuance to the applicant.
• A 24 hour notice is required for inspection; Please call Engineering: 771-3202
• Work is to be inspected during progress and at completion.
• Restoration to be in accordance with City Code.
• Street to be kept clean at all times. ,
• Traffic Control to be in accordance with City regulations.
• All street -cut ditches must be patched with asphalt or City approved material prior to end of working day;
NO EXCEPTIONS.
understand the above and that this permit must be available at the job'site for inspection purposes at all times.
Signature: Date:
1 Owner or Contractor
This Permit Must be Posted at the Job Site For Inspection Purposes
Call DIAL -A -DIG Prior to Beginning Work
APPROVED BY: #414 �k-
Time Authorized: Void after - /00 days.
Special Conditions:
RELEASED BY: '716 Date
PERMIT FEE: 30—
Restoration Fee: *
Receipt No.: A2_'-';b_3
Fund I I I Fee:
Street Cut Dimensions:
INSPECTED BY
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
Date
Lng. Uiv. Marn 19ZS9
FIELD INSPECTION NOTES (Fur, I I - Route copy to Street Dept.)
Comments:
Diagram:
CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO
Partial Work Inspection by P. W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
Eng.- Div. July 1985
T ®r F
R E CE I V E D
APR � G 1989
ENGINEERING
April 25, 1989
File No. 21-89-002-002
Mr. Jerry Hauth, P.E.
Hydraulics Engineer
City of Edmonds Public Works
250 -5th Ave. N.
Edmonds, Washington 98020
Subject: On -site Stormwater Detention System for Proposed Paving of Existing
Parking Lot
Dear Jerry:
At the request of our clients, First Church of Christ Scientist, we are sending you
three copies of the proposed on -site stormwater detention facility plan and
calculations for the proposed paving of the existing parking lot at 551 Maple Street,
for your review.
The existing timber wheel stops and the existing planters in the center of the main
parking area will be removed. The planters are not shown on the enclosed plan, but
were included in the calculation of the existing runoff coefficient.
If there are any modifications necessary for approval, or if the attached plan and
calculations are acceptable, please contact this office so that we can advise our client
when to apply for the paving permit.
Sincerely,
REID MIDDLETON, INC.
Enclosure
Ir:gep\frstcr.arm
19031 33rd Ave. W, Suite 301
P.O. Box 6638
Lynnwood, WA 98036-6638
206/775-3434
CITY OF
200 DAYTON ST. - EDMONDS, WASHINGION 98020 - (1`0�))
DEPARTMENT OF PUBLIC WORKS
Dear Resident:
HARVE 11. HARRISON
MAYON
March 16, 1981
On February 17, 1981, the Edmonds City Council passed
Resolution 488 for construction, reconstruction and repair
of deteriorated sidewalks. A public hearing will be held
in the Council Chambers at the"Civic Center on April 21,1981
at 7:30 P.M., You are invited ari
_to__atte,nd..,�his he. ng for
discussing,�' ' ' 1. . I , . I _7 - 1� , - -7, �'.
repair of portions of Ae ter iora'ted;.:.'si'de�4alik,
h t n
abutting y6ur pr6perty.*'Thb,- mprovem"i" 0 sid6�a
need of repair at the expense of the abutting property
owner is provided by City Ordinance, Chapter 7.20 and
Revised Code of Washington, Chapter 35.68.
The areas needing repair have been marked in paint on
the sidewalk adjoining your property. Reconstruction and
repair of these sidewalks must be completed on or before
September 1, 1981. In the event improvements are not
completed within the above specified time, the City will
perform and complete the improvements at-, the expense'of the.
abutting property owner.
This action is in response to many citizen requests
and pedestrian falling accidents which have been increasing
in recent years as a result of sidewalk deterioration and
increased pedestrian traffic.
Sincerely,,
FRED F. HERZBERG I
Director of Public works
CITY OF EDMONDS
— — — — — — — — — — — — —
PUB13C WCM — EN03INEERING
,,ACTION REPORT
SUSPENSE DATE:
i 'T
k;"! 3391
)ate:- ZK Time: 2 File #
Attachments: =Yes
No
3UBJECT:
'--Z,/- 1EL1,71
o 4. Teze 7-
1EQUESTOR: AE : A//,75 - /:-� /,-- -, E- /k/ r-) 6�yL-
ADDRESS: 1.:��7. & C.X-
PHONE- -741-
ZEQUEST RECEIVED BY:
TELEPHCNE
CONTACT IN OFFICE-pm��
OTHER:
AECEIVED BY: zc-:.
/z'/
I
m
M
OMM
7�4,
All Concerned Notified
Action Completed/File
21TY OF EDMONDS
PUBLIC WCRKS — EMINEERIM
ACTION REPORT
SUSPENSE DATE:
Da te: zir, Time: 2-* 20-'�N- File #
Attachments:
SUBJECT
REQUESTOR: NAME: /&S.
ADDRESS: Pe. e4l;� 414
PHONE: Z 7-4 - 4 f3 7V--
REQUEST RECEIVED BY:
TELEPHONE
CONTACT IN OFFICE-P�!r—
OTHER:_
RECEIVED BY:
onilTr TA.
N9 3391
=Yes
=No
ACTION:
,Y;,f
All Concerned Notified
Action Completed/File
CITY OF EDMONDS
250 5th AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202
COMMUNITY SERVICES
May 12, 1986
Mrs. Friesendahl
P.O. Box 414
Edmonds, WA 98020
RE: REQUEST FOR LOADING ZONE @ 551 MAPLE STREET
Dear Mrs. Friesendahl:
LARRY S. NAUGHTEN
MAYOR
PETER E. HAHN
DIRECTOR
After a field review of the site and existing conditions, I would not
be inclined to establish the requested parking restriction. The
reasons are twofold; on -street parking is at a premium throughout the
core area, and it appears that an alternative off-street access exists
from the alley.
The lack of a clearly definable and enforceable time limit for said
loading zone further compounds the situation. Should you have any
questions regarding this matter, please.call me at 771-3202, ext. 264.
CB/md
? �/�2
C;iidLa Date
Sincerely,
Chris Beckman, P.E.
Engineering Coordinator
Chris Date
PUBLIC WORKS PLANNING
PARKS AND RECREATION
0 ENGINEERING
L��
Mr. E.D. Phillips
Phillips Concrete Specialties
c/o R & R Coins
Box 1022
Lynnwood Washington 98036
Dear Mr. Phillips:
W
E�o
January 28, 1970
Returned herewith as enclosure "111 is your check in the amount of
$100.00 which was posted with the City of Edmonds in lieu of a restoration
bond for the sidewalks construction for the First Church of Christ Scientists.
The work has been completed satisfactorily to the City of Edmonds; and
therffore, your check map be released.
Yours very truly,
ciTy or EDMONDS
Lar R. LARSON
City Engineer
rf
Enclosure
"Mok
November 12, 1969
First Church of Christ Scientist
Board of Directors
Sixth and Maple Streets
Edmonds, Washington 98020
Gentlemen:
It is our opinion that Lased upon the present water -load demand
of your new structure a 3/4-inch water meter and service line would be of
sufficient capacity to meet these requirements.
Respectfully,
CITY OF EDMONDS
RONALD L. WHALEY
Aset. Director Of Public Works
RLW: eu
FIRST CHURCH OF CHRIST, SCIENTIST
551 MAPLE STREET
EDMONDS, WASHINGTON 98020
No vem6eA 7., 1969
CZty Of &Wndd
606ndbdy %4&:%�n
Attention: MA. lqonaJd WwUey, 10ub.&c iMmAd
'oi4e C,4011
&aA SiA.-
The BoaAd of DiAectow of Fim..4. ClwAch of C"4
Sc-Lentc4-1, &6" AeqLw-4.t4 Aa-t Ae Ct.�y of 6&wndd
.,zejwve 41m one and one-Aa-4 - 1 112" nze-teA mi 551
Alajnx�e SiAee-4 &wndd.. and, if po-i-jib-ze give U4 "edit
�6,4 Ae pnice of ;dw me-ieA. Any �a6vA codt to the
Ci;ty in Ate Aowva.,l mU be pa� 6� Ae &utAch.
N! find Aa� Vw 314" me;tet i4 .4ufliaeq,4 /o,.z otm
rwApo-de.
Ve-4y -44ay YOUA4y
La.Vida AaAl C.1elth
"RD OF Dli�fCT01'6
RECEIVED
NOV 111969
FIRST CHURCH OF CHRIST, SCIF' T
551 Maple
EDMONDS, WASHINGTON 98020
4t/ P ml
U)
)OV
.9 N ov
M/4 Abnold ghaley
PUbAC #bAd &Aectolz
Xo &u&it Rmee-i
KtVU Lb 1 114%j U
.REQUEST FOR PURCHASE.
Dept . ..... j5p.-Issrel.r1k ................
A ........................................ . .............
TY-1d, EDMONDS
Firin
L
Date ... . ... 5.e ;.,;j -- ----.... 19.6.9 ...
Reid. Middleton & AsSOC.i.a.t.e.s- ...................................
Confirming Order
Price: ............................... . .................
. ............................. ....................
Yes El No
. ..............................................................
324 Main Street
Price: ............................... . .................
. .. ..... . .. . ............................................ iiii
PURCHASING DEPT. USE ONLY
Edmonds, Washington 98020
C . ....... . .....................................................
......... . ....................................................... ............ . ...................................................
Purchase Order No .......................................
Price: ..................................................
PhoneNumber ........ 8.-,.1.1.7.1 ........................................... ........................
Ordered: ......................... ............................
Quotes Received By:
... . ................... Order on open market
Sufficient Budget Balance
DeliveryBy: ............................................... . .........................................................
YesNo
D El
............................ �io . y . se ............................
Quantity
Description
Item Code
Est. Price
Quoted Price
Engineering services in connection with check.
19.234
ind sewer elevation for church on
6th & Map
I hr. @ $14.00
$14.00
34 hra- (a ln-nO
15-00
2 hrs. @ 24.00
48.00
—2 mi- .
Total
.29
$97.20
File No.
1.720
Authorized By City Supervisor:
. . ...... . ...........................................................................................
...............................................
.. .... . ..........................................
LEF R. IPRSON.9 CITY ENGINEER
J
CITY OF EDMONDS
No. ........................... ......
Al
4
11
r
To .... R.E.1-D., .... MI.M.LETON ... & ... A.S.SOC.I.ATESO ---- I.N.C....
.... ..... ............
....................................................
...... 9.8.02.0 ......... ..........................
As Per Bill Attached Hereto
AMOUNT
DATE
iG. 26,
1969
ENGINEERING SERVICES IN CONNECTION WITH CHECKING
SEWER ELEVATION FOR CHURCH ON 6TH AND 14APLE:
1 HR. @ $14.00
3J HRS. 0 10.00
2 HRS. @ 24.00
3
4
5
8
2 .10
20
9
7
20
FILE No. 1.720
APPROVED: A A^-L -A D!�9
1, the undersigned do hereby certify under penaltyof perjury, that the materials have been furnished,
the services rendered, or the labor performed as described herein, and that the claim is a just, due,
and unpaid obligation against the City of Edmonds, and that I am authorized to authenticate and
certify to said claim.
f, (D "City Engineer
Signed......... -------------------- ......................... ..............................................
Title
CITY OF EDMONDS
_Rt.l.p.s.
. -.M1jRq4XTq;! ...
.... 3.2
..4-14AN ... S.T.RK91 .................................. .............
u. 98020
Epmqt4.pAs ... WA ..............................................................
07..-20 ........................
Department or Fund 11 AMOUNT
BUILDING DEPARTMENT
CITY CLERK
CIVIC CENTER
CITY SUPERVISOR
FIRE DEPARTMENT
IJBRARY
MAYOR & COUNCIL
PARK
ENGINEER
POLICE DEPARTMENT
ANIMAL CONTROL
POLICE COURT
PLANNING COMMISSION
PRINTING & PUBLISHING
RECREATION
STREET LIGHTS
TREASURER
WATER DEPARTMENT
WATER OFFICE
DISPOSAL PLANT
POWER FOR PUMPS
STREET DEPARTMENT
STREET ARTERIAL
EQUIPMENT RENTAL
L. 1. D. No.
SALARY FUND'
MECHANICAL CONTRAC
I N 0 0 0 R
CLIMATE
CONTROL
September 39 1969
City of Edmonds
Edmonds, Washington.
Gentlemen:
L L
Attention: Ronald L, Vialey
kssto Director of Public Works
Re., First -Church of Christ
551 Nple Street, Edmonds, Wpshingt*n
'Ub received copy of your letter dated August 28, 1969, addressed to
First Christian Church, pertaining to our deposit with the City of Edmonds
of $550.00 for installation of water meter at this project, and a finAl
credit of $72,R
'rkbile the water service was probably registered in our name, we have no
responsibility for the payment of water bills* It is our understanding
from the Specifications that the Generml Contractor will furnish temporpry
water service. Vb belbve also that the Owners will assume obligations for
the payment of water service on their occupancy and use of the premises,
Accordingly, by copy of this letter to C.B.S. Construction Company, the
General Contractor, we are forwarding herewith to C.B.S. Construction
Company one bill received from your department In the amount of $3.00, for
water use during -the period 4/24,69 - �/6-69, for their payment to you.
'We received no other bills for utilities from the City of Edmonds,
14b also ask you to mail us your check in full for $79.62 since we have no
responsibility for the payment of water service., either during construction
or after occupancy by the Owners. Please also ahsnge the registration of
the service from our name to thpt of the Owners,
Yours very truly,,
INDOOR CLT ONTROL., INC.
B Y
Tor Berg
cc: C.B.S. Construction Compsny
11205 Greenwood Avenue North
Senttle, Washington 98133
cc; PIrst ChristiRn Church
551 Tipple Street
Edmonds., Wpsh. 98020 GENERAL OFFICES AND
FACTORY LOCATED AT
2310 S.W. SPOKANE ST.
SEATTLE, WASH. 98106
TELEPHONE WE. 7-8210
August 26, 1969
First Christian Church
551 Maple Street
Zdawdso Waxhington 98020
Fe: $550-00 Depovit Made by Indoor Climate
Control, Inc., 2310 S*W. Spunke Street,
Seattle 28106 -- For 1-1/2" Water Motor
Installation C,, 551 Maple Street, Edmonds
Gentlemen:
The following Is the billing for the above captioned install&-
tion, which also included augoriag under the street to install the 1-1/2"
water service line for sames
WATER DLPARTMUT
Materials
Labor
AuSor Machine
Cyorhead
State Sales Tax
Sub -Total I
EQUIPMENT RLNTAL FUND
Equipment Rental
Overhead
200.70
120.00
50.ou
370.70
37.07
407.77
18.35
$ 426.12
38.50
3.85
$ 42,35
State Sales Tax 1.91
Sub -Total II $ 44.26
TOTAL CHA M S 470.39
L L S S D L P 0 S I T 550.00
TOTAL CREDIT ON 551 MAPLE ACCOUNT $ -79,62
- continued -
First Christian Church
August 28, 1269
Page Two
The foregoing work was performed by the City of Ldmonds Water
Department an Work Orders No. 2259 and 2272. which had required an
estimated $550,00 deposit for the performance of same. As you will not*,
there is a credit reflected an subject job. This credit will be applied
to the water account of 551 Maple Street. Edmonds, and will appear on
your water bill until it is absorbed. Should you have any question re-
garding this matter, ploaso do not hesitate to contact no.
ft"etfully yours,,
CITY Or LDNO*DS
RONALD L. WHALLY
Anst. Director of Public Wovk*
RLW t tu
cct Indoor Climate Controlq Inc.
44,
Atiguat 289,10,09
'Navo to Orot 'y'Dr6brery -Water Billing zk I
Dotty�, Knlr,,ht'*� Vater Dept - 'R vokk, ooep *r j �md
Mary go 0 r
,quipsaont R ntAl fsot�kk VIP I v
Roiald jL.- Adhoklettv
Ass,t!. tDlractor, of, Public Works
-Subjicti��'.,,,$550.00 Woci�jt Made by Indoor Climate,
ontr6l, Ina. 2310 S.W. Spunke Etreat
eat ttle 98106 ror 1-1/211 Wator Uter
strea
ti;, had is a copy of a billing (above Captionid), t�at` is I t��-)
uniqlas It, hu,;a' credit balance. Tills will please vla' customor but mny
present �,a tau challenges to, our . jo%)s iratoadw 'in other words 4 tramsfar,
Of funds $44.16).should b0ivAde frcm the Water De*
partment to the Eqquip�
mopt Rentia: F�nd �for cervices obtained and'the water account for 451 t1aple
Street, is t6,, have a"$79062 predit applied,to 3 am* until'absorbed. Please
ith,
chilck, w tw h any rob
s oUld lems &rise in carrying ou the,'f cre oing.
AL
vi
qi
1 4&,
First Christian church
'August,28' 1909
Pace Two
The foregoing work. wa's perfom*d by the City of Ldmouds WatQr
.,,Department on Work Orders No. 2259 and 2272, which had rcquixe 4 an
estimated $550.00 depo it for the performance of scre. A3 YOU Will notel
there is a credit refloated on subject job. This cralit will be epplied
to the water account of 551 Maple Gt"et, Edmonds, and will appemr on
your water bill until it is absorbed. Should you have sty question m-
garding this viatterg ploass. do not hesitata to contact ma.
Respactfully yours
CITY OF EDMUNDS
ON.
r ALD Lo WHALEY
tast, Director of Public Worki
ect Woor ClimatelControlt Inc.
*z'
4v
CUUIICI.0 1, J" '2114G
Jubi-1, 17, 1969
INM
S.,!;T H.;A-aiING J.0-� ON iILAii'h'IXiG COI4Jz)oMi A.JjULU'2IiN 14
Planning Coiawission Aesolution �314p recommending an amendment to the zoning ordinance
for general requirements for Planned Unit Developmentav was presented for.a council
hearing datev and it was moved by Councilman Haines, seconded by Councilman Nord�juist
that -august 5 be set as the date for hearing before council on illanning Commission
Resolution ,--314. hotion carried.
INVITATION TO CUUNCIL fIlOi-i COLIJiSION
,,n invitation was extended to'the council from the Planning Comuission to attend a
special meeting on June 25 at 8sOQ dealing with the waterfront question.
FIR"4URKS �)TAIQ P_2idTS
A letter was read frota Fire Chief Oooper recoLiuending approval of the fol lowing per-
mits for fireworks stands for the 4L, of Julyt
Thunderbirds Drum and Bugle Corps 2005 9�4 avenue S.
Tenth ,)uorum of -Aders 1640 9:L2 itvenue S.
Edmonds Jaycees 9A avenue and i-;dmonds Way
A motion was made by Councilman Nelsont seconded by Councilman Nordquist that the
above fireworks stands permits be approved. hotion carried.
12_md'-ieURj-�RY C Q*A C h; oS I u 1� 11 _�Ai iI -2 6
Applications for temporary concessions for the 4.L- of Jul.:. were presentedg for the
American Legion -.uxiliary to sell pop corn, cotton candy and coffee located at Urner's
Shoe Store 420 iiaint the City i?ark, and the north and south side of the ferry dock;
and the Sno-King Lady Lions (proceeds to benefit activities of the blind) for
balloons along the parade route. Councilffian Tuson made a motion, seconded by Council-
man iiordquist that the temporary concession aSreements for the ,.merican Legion Auxil-
iary and the Lady Lions be approved. Ilotion carried.
COA�t'�J.eUi'DZd'.`C;j
A letter was read from John J. Deer, 7205 28L� ive. N.-I., 6eattle. Pir. Deer asked
for 2 hour parking signs to be placed in front of his apartment building across the
street west of the Post Office between illain and Bell 6treets. 'Aiis was referred to
the Chief of Police.
A letter from 1-irs. Chas. W. Beilke was reado requesting the permanent closure of the
street through the Chase Lake School, and sugaested if the Police or z'ire De,)ts.
needed 4 key to open the.streetv they would be willing for them to have this arrange-
ment. Both the �'ire and eolice Ciiiefs were present and voiced no objection to the
closure of this street with a chain gate and key available. Councilman Sennett
stated he did not feel the council should permanently block this street before a long
look is taken into the situution. Ray Loore, a resident of that area, complained of
the street being used by cars for a raceway. Ae said that the street presented prob-
lems after school hours, not when school was in sessiont and that the safety of chil-
dren living in that imuediate area was jeopardized by this street remaining open
after school was closed. Bob Aacker stated that he was interested in having the
road closed and chained. There was a great deal of discussion on the subjectf both
in the audience and from the council. A motion was made by Councilman Bennett,
seconded by Councilman Haines that the street that runs east and west on the north
side of the Chase Lake �lementary School not be permanently barricaded or closed.
A roll call vote was taken, with Councilmen Bennett and r1aines voting in favor;
helson, Tuson and i�ordquist against and the motion failed to carry.
A letter from. Dan ,,nderseng 800 - 12� avenue S., complained about the condition of
the road8 in Mwonds and Bowdoin day in particular, and asked what the ci.ty proposed
to do about it, hayor Harrison noted that Bowdoin day was on the priority list for
arterial approval.
A letter was read from Fred S. !.,eserve,'Chairman of the Board of Directors of the
First Church of Christ, 6cientist. Ae stated that the cost of furnishing * a perform-)
ance bond for installation of required paving and drainage system in thOir parking.
COUNCIL MEETING MINUTES
JUNE 17, 1969
-3-
area and connection within six months from time of completion of a permanent storm
sewer in the immediate vicinity of the church property would be a burden upon the
congregation. They requested consideration of the waiving of the required perform-
ance bond. It was estimated by council that a bond for 05000-00 would probably cost
approximately ;�50-00 per year. Following some discussion, it was moved by Councilman
Bennett that the city not waive the required performance bond, and this motion died
for lack of a second. It was then moved by Councilman Haines, seconded by Councilman
Tudon that the city require the church to maintain a performance bond for a period of
one year, and then the council could review the circumstances at that time. Motion
carried. ?
Two letters, one from Police Chief Grimstad and one from Fire Chief Cooper, were
received in regard to 751� Avenue W. as it runs along the area in north Edmonds near
the water. It was stated that this narrow street needed parking limitationso and
both Chiefs Cooper and Grimstad advised allowing parking one side only, preferably on
the west side. It was moved by Councilman Bennett, seconded by Councilman Nelson
that an ordinance be prepared pursuant to this request. Motion carried with Council-
man Haines abstaining, since his property abuts this area.
A letter of resignation as Director of Public Works was read from John Moran, who has
accepted a similar position with Cowlitz county. Mayor Harrison noted that the
position of Director of Public Works would not be refilled at this time, pending
results of the study presently being made by the professional management consultant
firm of Harry J. Prior & Associates. It was moved by Councilman Nordquistp seconded
by Councilman Haines that the resignation be accepted with regret and a Resolution
be prepared commending John Moran for his service in the employment of the city.
Motion carried.
AUDIENCE PARTICIPATION
Representatives from the newly formed organization called PRIDE were in the audiencep
and Mr. Mueller, one of the members, mentioned that their newsletter and a copy of
their goals had been received by each councilman. He added that the organization
wished to be of help to the city in any way it could.
A gentleman in the audience asked a question concerning overlays put on streets to
patch following installation of sewer lines.
Another gentleman in the audience brought to the attention of
short cycle for the green traffic light when travelling north
intersection. This problem was to be looked into.
COUNCIL PARTICIPATION
council the unreasonable
on 919 at the Westgate
Because of the extreme heat and uncomfortable conditions, Councilman Bennett made a
motion that they strike the council participation section for this evening. This
motion died for lack of a second.
Councilman Nelson suggested that the Police Dept. and City Engineer take an additional
look at the holding lane situation on Sunset Avenue for the ferry traffic.
Councilman Haines inquired if the ferry system had been contacted in regard to the
necessity of the city having extra patrolmen on duty due to the ferry traffic.
Mayor Harrison answered that he had called the Washington State Perry system on this
mattert and that they did not seem too enthusiastic about being responsible for the
extra patrolmen needed, but they had admitted that they used and paid for off -duty
policemen -at the Coleman dock in Seattle during rush ferry traffic, but explained
that was a different situation. Councilman Haines made a motion that an accurate
account of the man hours spent be tabulated, and billed to the ferry system for that
amount.. Mr. Ted Chittenden, Port Commissioner, was present in the audience and re-
minded the council that there was a proposal for expansion to double the size of the
present ferry dock to eliminate the holding lanes on city R/W entirely. Councilman
Haines amended his motion to eliminate the billing to the ferry system, and merely
advise them of the extra man hours used and paid for by the city. This amended
motion was seconded by Cuuncilman Bennettq and carried.
Councilman 'Tuson stated he thought that because of the condition of some of the
streets with a Present 35 mph speed limit, a change to 25 mph was in order, and he
" I
0
MEMORANDUM
Date: January 3, 2000
To: Edmonds City Council
From: Maryanne Zukowski, Traffic EngineerA
Subject: Loading Zone Request
The Engineering Division has received a written request for a loading zone from the First Church
of Christ Scientist located at 551 Maple Street. The written documentation for this request is
enclosed for your review and comments.. -
I will initiate* a work order for Public. Works to create the requested loading zone unless I hear
objections by January 18, 2000.
City of Edmonds
Development Services Depa ent
Engineering Division
FIRST CHURCH OF CHRIST, SCIENTIST
551 MAPLE STREET
CHURCH: 425-778-4007 EDMONDS, WASHINGTON 98020-3434 READING ROOM: 425-778-3553
December 19, 1999
City of Edmonds
ATTN: Mary Ann
121 — 5th. Ave. N.
Edmonds WA 98020
Dear Mary Ann,
I received your telephone message this morning requesting a copy of the letter Clyde Dimmick
presented to you. In attempting to review your message, I inadvertently pressed the "Delete"
instead of the "Repeat" button before I was able to write down your last name.
I've inclosed a copy of the original letter. Thank you for your assistance in this matter.
Sincerely,
The Executive Board
Paul S. Bishop
Clerk
FIRST CHURCH OF CHRIST, SCIENTIST
551 MAPLE STREET
CHURCH: 425-778-4007 EDMONDS, WASHINGTON 98020-3434 READING ROOM: 425-778,3553
December 1, 1999
Mr. Clyde Dimmick
213 Elm St
Edmonds WA 98020
Dear Clyde,
This is the information you requested about the use of the DART public transportation system. It
is used by Patricia Wurn who regularly attends our services and lives at the Aldercrest Nursing
Home at 21400 — 72nd Avenue West in Edmonds. She is brought to our Church by a DART van
with a hydraulic ramp which lowers her wheelchair to the sidewalk where ushers greet her and
wheel her into the Church.
Sincerely,
The Executive Board
� - e'X-1 �
Paul S. Bishop
Clerk
Item
COUNCIL COMMITTEE MEMO
Committee: Community Services/Development Services
Meeting Date: January 11, 2000
Subject: Loading Zone Request — 551 Maple Street
From: Jim Walker
e�t
Mayor:
Comments:
Council requested placement of this item following receipt of the attached memo.
Currently the City has no established criteria for placement or establishment of loading
zones. The Traffic Engineer believes that a loading zone would be appropriate in this
area since there are no other loading zones in the vicinity.
The procedure for establishing loading zones is established in the Washington Model
Traffic Ordinance which was adopted by the City in 1976. Section 46.90.265 (14)
authorizes the Traffic Engineer, "To determine the location of loading zones, passenger
loading zones, and tow -away zones and shall place and maintain appropriate signs or
curb markings supplemented with the appropriate words stenciled on the curb indicating
the same and stating the hours. during which the provisions of this chapter are
applicable."
Affachment
City of Edmonds
MEMORANDUM
Date: January 3, 2000
To: Edmonds City Council
From: Maryan . ne Zukowski, Traffic EngineerA
Subject: Loading Zone Request
The Engineering Division has received a written request for a loading zone from the First Church
of Christ Scientist located at 551 Maple Street. The written documentation for this request is
enclosed for your review and comments.
I will initiate a work order for Public Works to create the requested loading zone unless I hear
objections by January 18, 2000.
City of Edmonds
Development Services Department
Eneineerine Division
FIRST CHURCH OF CHRIST, SCIENTIST
551 MAPLE STREET
CHURCH: 425-778,4007 EDMONDS, WASHINGTON 98020-3434 READING ROOM: 425-778,3553
December 19, 1999
City of Edmonds'
ATTN: Mary Ann
121 — 5th. Ave. N.
Edmonds WA 98020
Dear Mary Ann,
I received your telephone message this morning requesting a copy of the letter Clyde Dimmick
presented to you. In attempting to review your message, I inadvertently pressed the "Delete"
instead of the "Repeat" button before I was able to write down your last name.
I've inclosed a copy of the original letter. Thank you for your assistance in this matter.
Sincerely,
The Executive Board
Paul S. Bishop
Clerk
FIRST CHURCH OF CHRIST, SCIENTIST
551 MAPLESTREET
CHURCH: 425-778-4007 EDMONDS, WASHINGTON 9802.0,3434 READINGROOM- 425-778,3553
December 1, 1999
Mr. Clyde Dimmick
213 Elm St
Edmonds WA 98020
Dear Clyde,
This is the information you requested about the use of the DART public tran ' sportation system. It
is used by Patricia Wurn who regularly attends our services and lives at the Aldercrest Nursing
Home at 21400 — 72nd Avenue West in Edmonds. She is brought to our Church by a DART van
with a hydraulic ramp which lowers her wheelchair to the sidewalk where ushers greet her and
wheel her into the Church.
Sincerely,
The Executive Board
Paul S. Bishop
.Clerk
"A Good Customer Is Worthy nf:71very Consideration"
WESTERN UTIMES SUPPLY (0. 'joTA
'
Waterworks, Heating & Industrial Supplies
P.O. BOX 3524 5409 OHIO AVE SO.
SEATTLE. WASH. 98124 ROckwell 2-7025 S EATTLE, WASH. 98134
elu
;e r:5
Al
0
1�1
'10
jolL.4-3-
4-1
4� 41-
�m
7-7
AO* Aft
September 25, 1968
Kirk, Wallace, McKinley
As I* A. & Associates, Architects
2000 Fairview Avenue Last
Seattle, Washington 98102
Re: First Church of Christ Scientist
Edmonds,, WashinLton
Gentlemen:
The Umonds Planning Department has reviewed the above noted plan for con-
formity with the Edmonds Zoning Ordinance and Variance Application V-27-67.
In September, 1967 the church requested a variance from the parking require-
ments of the zoning ordinance. The building plans presented by the church
at that time showed a seating capacity of 2SO seats. For this number of
people the zoning ordinance requires 83 parking spaces (I parking space per
3 fixed seats). The Board of Adjustment acted favorably on this application
and required that the church provide only 57 parking spaces for the 250 seat
structure. The building plans submitted by your office now indicate that
the seating capacity has been reduced from 250 to 200 seats. Reducing the
parking requirement in proportion to the reduced seating capacity would
indicate a revised parking requirement of 46 spaces, The proposed site
plan is deficient by one space when correct parking space dimensions, as
required by the Zoning Ordinance. are applied to the parking arrangement.
A copy of the Zoning Ordinance provisions regarding parking lot development
was given to a member of your firm about two weeks ago. This ordinance also
requires the installation of a specific amount of landscaping and specific
landscape items in conjunction with parking lot development.
It is requested that a revised site plan for this property be drawn and
submitted to this department prior to the issuance of a building permit.
If you have any questions regarding the parking lot provisions, please do
not hesitate to call us.
Marlin Logan
City Planner
MLsjt
cc: W. J. Slabaugh, Bldg. Official
Leif Larson, City Engineer