Loading...
600 3RD AVE S.PDF4992 600 3RD AVE S ADDRESS: TAX ACCOUNT/PARCEL #: BUILDING PERMIT (NEW STRUCTURE) #: COVENANTS (RECORDED) FOR: CRITICAL AREAS #: DETERMINATION: Conditional Waiver Study Required 0 Waiver CRITICAL AREAS #: DETERMINATION: F1 Conditional Waiver Study Required El Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORD FOR: PERMITS (OTHER — list permit #'s): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: 1417 SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: 74� GEOTECH REPORT DATED: STREET USE/ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: L:\TEMP\DST's\Forms\Jana's Street File Checklist 5-14-08.doc P R 0 J E C T C H E C K L I S T tv PROJECT NAME: ccriv Plia-pbloic, 4gif;. M� CONTACT PERSON PROJECT ADDRESS: 4-t,�s PHONE NUMBER: —Z PLANNING Date Sent: Date Returned: �12 1 Zone: Environmental Checklist: ADB No.: Landscape Plan: Use #: i'variance: Other: Ay ENGINEERING Date Sent: Date Returned: Site Plan/Development Plan: Ok (2 copies) Drainage Plan: K (2 copies) Bond Cost Estimates: "COMMENTS: FIRE Date Sent: Date Returned: �Memo Sent to Developer/Owner: !COMMENTS: /yo 601Y)Iku'vi A iBUILDING ]Permit & Plans Submitted: lo 6id'Y26 Ablal lo //K� 'Y61 Y& Legal Description Checked: 1L.I.D. Checked: Sent to Plan Check: (date) Returned: (date) Plan Checker: (name) COMMENTS: �kj BONDS 111,q Date informed: Estimates approved: Performance Bond: $ Maintenance Bond: Date Released: Date Released: DAT� PEPj','.IT ISSUED & A IFF PERMIT NO: 9S 0 ss� . (date) FINAL APPROVAL:, (date) CERTIFICATE OF OCCUPANCY: