Loading...
609 5TH AVE S.PDF111111111111 5193 609 5TH AVE S TAX ACCOUNTIPARCEL NUMBER: = !q:1 3 0 0, 0 c (3 --'-/ 0 0 BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS:-6�0-7-0/0&�— DETERMINATION: E] Conditional Waiver '0 Study Required E] Waiver DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS(OTHER): PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: 1610-1- SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED. SIDE SEWER PERMIT(S) #: GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: LATEMP\DSrs\Fomis\Street File Checklistdoc -C. I b7 "20 city orEdMonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.0221 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable City staff to deterniine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available fro in observations of the site or data available at WH0TreBUWGmKUT RUGAION PIC Date Received: &(a A) ?- City Receipt#:_ A /0 L+ao -19 1 Critical Areas File #: 62&V--�- Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant:- ' ;--/D - 0'7 A property owner, or his/her authorized representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist,. make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in finding and locating the specific piece of property described on this form.. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersigned applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant his/her/its agents or employees. By my signature, I certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this application on the behalf of the owner as listed below. SiGNATuRE oF APPLiCANT/AGENT DATE Property Owner's Authorization By my signature, I cer* that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject �property for the purposes of inspection and po * g attendant to this I * ation. -A-SIGNATURE OF OWNER 10-7 Z� --- DATE I PLEASE PRINT CLEARLY Owner/Applicant: Name 6 0 9 ff 6--t-11 4oc, 5, Street Address ( 5 ��0170X)A City State Zip Telephone: (Z-06 ) -5oa Email address (optional): 3939 W0<5 Applicant Representative: Name Street Address city State zip Telephone: Email Address (optional): #P20 CA File No:_C0U0-)- IDZ- Critical Areas Checklist Site Information (soils/ topography/ hydrology/vegetation) 1. Site Address/ Location: C'/ C -5 2. Property TaxAccount Number: 0 0 ±;j' Z -,-:3 0 0 0 0 0 ar? 0 3. Approximate Site Size (acres or square feet)- 60 X\ /7_0 YZ00 4. - Is this site currently developed? Xyes; — no. If yes;, how is site developed?. :5- 1 5. Describe the general site topography. Check all that apply. r Flat: . less than 5-feet elevation change over entire site. Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more V!j,; :rise of JO 41 over ' a horizontal distance of 33 to 66-feet)"' 3 Steep: grades of greater than 30% present on si a ffrtical risk'�. 11 ver a or� jeet 6 distance of less than 33-feet). ...�W Other (please describe): �5'�A, T B L_ P 61 MA-) .57— '55� /� 6. Site conWns areas of year-round standing water: ;Approx. Depth: 7. Site contfiris areas of seasonal standing water: Approx. Depth: What season(s) of the year? 8. Site is in the floodway - 106 floodplain of a water course. 9. Site conkims a creek or an area where water flows across the grounds surface? Flows are year-round? /() () - — Flows are seasonal? — (What time of yearT_ 10. Site is primarily: forested meadow ;shrubs mixed urban landscaped (lawn, shrubs etc) 1 1. Obvious wetland is present on site: PD 1. Plan Check 2. Site is Zoned? 3. 4. SCS mapped soil type(s)? -For City Staff Use Only ble? 'ZOO-7- 0-7 1 ( Critical Areas inventory or C.A. ma 0 t9'rL indicates Critical Area on site? _SSi(o G, sZ 2n r r 5. Site within desianated earth'subsidence landslide hazard area? 10 DETERMINATION IT W. V MAM, Reviewed IV, I so 66 CITY OF EDMONDS CRITICAL AREAS RECONNAISSANCE REPORT Site Location: 609 5th Avenue S. Tax Acct. Number: 004730000040; Determination: Study Required Determination #: CRA-2007-0102 Applicant: Leo Kaarrekoski Owner: Leo Kaarrekoski CRITICAL AREAS RECONNAISSANCE REPORT: STUDY REQUIRED During review and inspection of the subject site, it was found that the site contains and/or is adjacent to an Erosion Hazard Area, pursuant to Chapters 23.40 and 23.80 of the Edmonds Community Development Code (ECDC). GENERAL CRITICAL AREAS REPORT REQUIREMENTS Critical Areas Reports identify, classify, and delineate any areas on or adjacent to the subject property that may qualify as critical areas. They also assess these areas and identify any potential impacts resulting from your specific development proposal. If a specific development proposal results in an alteration to a critical area, the critical areas report will also contain a mitigation plan. You have the option of completing the portion of the study that classifies and delineates the critical areas and waiting until you have a specific development proposal to complete the study. You may also choose to submit the entire study with your specific development application. Please review the minimum report requirements for all types of Critical Areas that are listed in ECDC 23.40.090.D. There are additional report requirements for different types of critical areas (see below). Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. There are options on how to complete a critical areas study, and there is an approved list of consultants that you may choose from. You may contact the Planning Division for more information. General Mitigation Requirements for all Critical Areas are discussed in ECDC 23.40.110 through 23.40.140. STUDY REQUIREMENT — EROSION HAZARD AREA It appears that this property contains or is adjacent to an Erosion Hazard Area. Erosion Hazard Areas include: 0 Those areas with Alderwood and Everett series soils on slopes of 15 percent or greater. Any area with slopes of 15 percent or greater and impermeable soils interbedded with granular soils and springs or ground water seepage. Areas with significant visible evidence of ground water seepage, and which also include existing landslide deposits regardless of slope. . J. , . so % DEVELOPMENT PROPOSALS ASSOCIATED WITH EROSION HAZARD AREAS Development within an Erosion Hazard Area must meet additional criteria. For erosion hazard areas with suitable slope stability, the only critical area study needed is an erosion and sediment control plan prepared in compliance with the requirements set forth in Chapter 18.30 ECDC as part of the construction documents. This option is at the director's discretion, per Edmonds Community Development Code section 20.80.050.G. In areas where the slope stability is not suitable, projects within Erosion Hazard Areas will require a report by a licensed Geotechnical Engineer or other qualified professional. Note that it is important for the report to be prepared by a qualified professional as defined in the ordinance. Report requirements are given in ECDC 23.80.050, and more generally in ECDC 23.40.090.D. 0 Development standards are given in ECDC 23.80.060 and 23.80.070. ALLOWED ACTIVITIES Certain activities are allowed in or near critical area buffers as specified in ECDC 23.40.20. If you have any questions about whether your proposed development qualifies as an allowed activity, please contact a Planner for more information. EXEMPT DEVELOPMENT PROPOSALS Certain development proposals may be exempt from Critical Areas Requirements (ECDC 23.40.230). If you think that a specific development proposal may be exempt, contact a Planner for more information. NOTE: Cited sections of the Edmonds Community Development Code (ECDC) can be found on the City of Edmonds website at www.ci.edmonds.wa.us. 2 The City of Edmonds Side Sewer Drawing EASEMENT NO - ------------ --- _ -------------------------- 104-04900 NEW CONSTRUCTION REPAIRS E] LID NO. ----------------- - ASMT. NO - ------------------ OWNER ------ MART-T-1 ... KARAKOSKI --- -------------------------- -------------- CONTRACTOR ----- ------------------------------------------------------------ ----- PERMIT No - -------------------- JOB ADDRESS ----- 6-Q9 --- :7� ... 5-TH --- AVE-----S --------------- -------------------- LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ---------------------- ------------- --------------- ------------------------------------------------------------------------------ ------------------------------------------------------------------- NAME OF ADDITION ------------------------------------------------ DYE TESTED ON SEWER Approved: PWW-OW1 -11/75 (REV, 11/78) DATE ----------------------------------- ------ - BY ----- ------------------------------------------------------ �Lawler, Patrick I To: tutmarc@msn.com Subject: 609 5th Ave. South Dear Michael Tutmarc, Regarding your inquiry as to the feasibility and permitting requirements for a proposed rockery at the above address: • According to the AESI geotechnical report dated July 7, 2009, the proposed rockery is an erosion control structure , not a retaining wall. • The adjoining property owners are sharing the costs and responsibility for the construction and maintenance of the rockery, and will have a written agreement stating so. • The rockery is not proposed to be constructed any higher than the existing six foot wall. • Planning has determined that the lot is in an erosion hazard area, not a landslide hazard area. • Temporary erosion control measures will be in place for the duration of the project to mitigate erosion hazards. Permanent erosion control measures to be completed as per referenced geotechnical report (G), page 3. • Geotech to approve drainage and drain termination, with drain water connected and discharged to an approved location on site. Conclusion: Based on the above information and ECDC 19.05.010, no permit is required for the proposed rockery. Pat Lawler Plans Examiner City of Edmonds Aftciated Eirdi Sciences, 9c. M FE, N Ce(Wra6n C�er.25 Vapy ofSeMee r"+"_0rC 0 July 7, 2009 7 L) —I TA,&(Z_c_, Project No. KE090247A By Design Rockeries P.O. Box 1694 Duvall, Washington 98019 Attention: Mr. Gordon Vigus Subject: Rockery Recommendations 609 5' Avenue South Edmonds, Washington Dear Mr. Vigus: 2C( -7 — T59 — -9 _� -7 5 �K e;t!:P \/ t e,- 0 S 4��RA6F_ t3l'_( . 1) F_ S- I /_ � P, 0 r_ e�_S. zo( , - '3z-1 - Z44+ At your request, Associated Earth Sciences, Inc. (AESI) is pleased to present this letter summArizing our observations and recommendations at the above -referenced site. This letter is based on our visit to the site on June 22, 2009, and discussions with you. This letter has been prepared for the exclusive use of Mr. Gordon Vigus and his agents for specific application to this project. Within the limitations of scope, schedule, and budget, our services have been performed in accordance with generally accepted geotechnical engineering and engineering geology practices.in effect in this area at the time our letter was prepared. No other warranty, express or implied, is made. It must be understood that no re ' commendations or engineering design can yield a guarantee. of stable slopes. Our observations, findings, and. opinions are a means to identify and reduce the inherent risks to the owner. The purpose of our work was to perform a visual evaluation of the area in which there is. a rockery proposed to replace a concrete masonry unit (CMU) wall. The existing wall parallels the property line along the east side of the property, has a maximum height of about 6 feet,' and is out of plumb at this time. The approximate 10-foot-wide driveway is at the base of the wall for nearly the full length, and there is a small shed/garage at the southeast corner at the base of the wall. In this location, the shed is about 3 feet from the toe of the wall. It is our understanding that the grade in front of the new rockery will remain the same. Currently.the area at the top of the wall is landscaped and is level. Near the center of the length is a residence that is set back about 10 feet from the top. Kirkland Everett Tacoma 425-827-7701 425-259-0522 253-722-2992 www.aesgeo.com 0 0 No explorations were performed at the time of our site visit, and there were no exposures on the slope. However, the native soils in the area are mapped as dense glacial till. There were no seeps or areas of high moisture observed in the slope on this date. The new rockery will have a maximum height of 6 feet. The rockery will taper down to the north from the southeast corner. It is our opinion that this plan is acceptable with the following recommendations. A typical rockery detail/sketch is attached as Figure 1. It should also be noted that, although rockeries are commonly used, they should be considered a long-term maintenance item. A) The base of the rockery should be started by excavating a trench to a minimum depth of 12 inches below subgrade into firm, undisturbed ground. If loose, soft, or disturbed materials exist at the base rock location, they should be removed and replaced with free -draining sand and gravel or crushed rock. B) 'The base rock should have a minimum width (perpendicular to the line of the rockery) of 40 percent of the height of the rockery. All rocks should also meet the following weight requirements: Height of Rockery Minimum Weight of Roc 5 feefor less 50011,000 pounds, graded, top/bottom rocks Above 5 feet 500/2,200 pounds, graded, top/bottom rocks Q The rock material should all be as nearly rectangular as possible. No stone should be used that does not extend through the wall. The rock material should be hard, sound, durable, and free from weathered portions, seams, cracks, or other defects. The rock density should be a minimum of 160 pounds per cubic foot. D) Rock selection and placement should be such that there will be minimum voids and, in the exposed face of the wall, no open voids over 8 inches across in any direction. The rocks should be placed in a manner such that the longitudinal axis of the rock will be at right angles or perpendicular to the rockery face. Each rock should be placed so as to lock into two rocks in the lower tier. After setting each rock course, all voids between the rocks should be chinked on the back with quarry rock to eliminate any void sufficient to pass a 2-inch square probe. E) The soil behind the rockery shall be compacted to a firm and unyielding condition at or near the optimum moisture content of the soil. F) A drain consisting of rigid, perforated, polyvinyl -chloride (PVC) pipe enclosed in a 12-inch-wide pea -gravel trench should be placed behind the lower course of rock to remove water and prevent the buildup of hydrostatic pressure behind the rockery. The remainder of the rockery backfill should consist of quarry spalls with a 2 r 0 0 maximum size of 4 inches and a minimum size of 2 inches. This material should be placed to a 12-inch minimum thickness between the entire wall and the cut material. The backfill material should be placed in lifts to an elevation approximately 6 inches below the top of each course of rocks as they are placed, until the uppermost course is placed. Any backfill material falling onto the bear' surface of a rock course Ing should be removed before the setting of the next course. G) The areas above rockeries should be planted with grass as soon as possible after rockery construction to reduce erosion. We appreciate the opportunity to be of service to you on this project. Should you have any questions regarding this letter or other geotechnical aspects of the property, please call us at your earliest convenience. Sincerely, ASSOCIATED EARTH SCIENCES, INC. lKirldand, Washington A. Al WAS 4 /STE 0 NAL Matthew A. Miller, P.E. Senior Associate Engineer Attachment: Figure 1 - Unreinforced Rockery Detail MWAd KE090247AI PrqjecLs\20090247W,nWP 3 li 6 12" FIRM UNDISTURBED SOIL SEE NOTE 2 NOTES: NO ROADWAY, PARKING LOTS OR BUILDING FOOTINGS IN THIS AREA I'MIN 2 OR FLATTER 1 F- - �jl I MIN VWIDE LAYER OF 2"-4" QUARRY SPALLS ADJACENT TO ROCKERY STABLE CUT FACE IN NATURAL MATERIAL SEE NOTE 5 1" OR LESS DIAMETER WASHED GRAVEL MIN 6" COVER OVER PIPE, 2" GRAVEL UNDER PIPE MIN 4" DIAMETER PERFORATED RJGID PVC PIPE MIN 1 % CONTINUOUS SLOPE TO OUTLET 1. ROCKERIES HIGHER THAN VSHALL BE CONSTRUCTED OF ROCKS OF GRADUATED SIZES FROM 5-MAN TO 2-MAN, FROM BOTTOM TO TOP. ROCKERIES OF VOR LOWER SHALL BE CONSTRUCTED OF 3-MAN TO 2-MAN, FROM BOTTOM TO TOP. 2. INSPECTION OF SUBGRADE, PLACEMENT OF BASE COURSE AND DRAINAGE, AND FINISHED ROCKERY BY ENGINEER IS REQUIRED. 3. ROCK SHALL BE SOUND AND HAVE A MINIMUM DENSITY OF 160 POUNDS PER CUBIC FOOT. 4. THE LONG DIMENSION OF ALL ROCKS SHALL BE PLACED PERPENDICULAR TO THE WALL. EACH ROCK SHOULD BEAR ON TWO ROCKS IN THE TIER BELOW. 5. ROCKERIES ARE EROSION -CONTROL STRUCTURES, NOT RETAJNING WALLS. NATURAL MATERIAL MUST BE STABLE AND FREE STANDING IN CUT FACE. MAXIMUM HEIGHT OF 3 FEET FOR ROCKERIES FACING UNREINFORCED FILL SOILS. 6. SEE TEXT OF REPORT FOR ADDITIONAL RECOMMENDATIONS. ROCK L.B. AVG. DIMENSION (IN.) I -MAN 50-200 12 TO 18 2-MAN 200-700 18 TO 28 3-MAN 700-2000 28 TO 36 4-MAN 2000-4000 36 TO 48 5-MAN 4000-6000 48 TO 54 A - -Li- FIGURE I ObuLlaLc Z Science jitc. X' al u RE -I r0ritau ROCKER T UE: I IAIL 609 5TH AVENUE SOUTH DATE 7/09 EDMONDS, WASHINGTON PROJECT NO. KE090247A C/j N AS. V\ 0 M-N > TJ 'N.J C) 9C, CD 0 Qz_� INV 9 ,V. %'A -4 0 -Nothing in this Permit approval 0 interpreted as alln . Process shall be Wmg or, permitting the tenance of any U',renflY eiiisting illegal, nonconfornj�ng or unporm-AW building, structure Pe=t application, repaAnj building, structure or con( site plan or d.—awing, &1cl, conclition may be the subj( enforcemeni action." A =A x m M m m3s of whethei mi�ii7 L�on is shown on the )uilding, structure or .t of a separate ON A; -ps rr, &0 eUF-T-,4. i AJ 0-1 j A (-(:- Co 0 PLANNING DATA SINGLE FAMILY RESIDENTIAL 0 11 STREET FILE 11 Name: K Ot CL NY L9.4 Date: S ( �O7 ------ Site Address: 0� S- ",44 5 Plan Check # -. 200 -7- 0 r-? I ( Project Description: A�, , o(r r ol) �rq,, 1,4 �,j r- c- (n aAd r'a 7 Le 001 C QA Crd e- Of CW e- Reduced Site Plan Provided.- (9/ NO) Zoning: S Map Page: Corner Lot: (YES Flag Lot-. (YES Critical Areas Determination ff: 7,w -)0 510,0 ho Ed -Study Required �(01 Ic all �r wey- 1-�\) -1 /LJC, CeI4 11 Waiver SEPA Determination: V-Exempt El Needed (for over 500 cubic yards of grading) 0 Fee 0 Checklist El APO List with notarized form (Al.) Required Street: Side�43' Side. Rear: 1 Actual Setbacks Street: to Side: 16 Rear: 63 11 Detached Structures: Rockeries: Fencesfl-rellises: El Bay Windows/Projecting Modulation: El Stairs/Deck: Buildili Hetqht Datum Point: Datum Elevation: Maximum Height Allowed: Actual Height: Other Parking Required: Parking Provided - Lot Area: - Maximum Lot Coverage: 35% Proposed: Lot Coverage Calculations: ADU Created: (YES /(N-30) Subdivision - Legal Nonconforming Land Use Determination fssued: (YES / CO Comaients Plan Review By: 4�� ek9Z7_ Plannog Data Form 04-11-06.doc 0 �T .11 -'R,1'..-"."T F 0 9LE CITY OF EDMONDS 250 5th AVE. N. - EDMONDS. WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES June 26, 1987 William Pedersen 609 5th Ave. S. Edmonds, WA 98020 Dear Resident: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR The City of Edmonds is currently engaging in a program to improve its wastewater treatment system. One of the major parts of the program is reducing the volume of flow into our treatment plant. A major item contributing to this problem is the infiltration of stormwater runoff from roofs, drains, etc. into our sanitary sewers. A series of tests were completed by an independent engineering firm. They pumped smoke into sewer lines and recorded where it was escaping, thereby locating the stormwater infiltration sources. Your property has been identified as having a roof drain connected to the sewer and the City requires, per the Community Development Code, Chapter 18.10, Section 18.10.030, that this problem be corrected. Please contact myself or Everett Akau of our Water/Sewer Section by July 24, 1987 to provide you with further information and to answer your questions. Member of the staff will be glad to advise you as to your best solution. Your assistance in disconnecting this source is requested no later than August 7, 1987. Sincerely, Archie Brena Water/Sewer Supervisor AB/1 k cc: Bobby Mills RUNOFFL/TXTWATER PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING 0 C,cATY OF 7--E3M0H13ER3 250 - 51h AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 OFFICE OF THE CITY ENGINEER December 12, 1983 Martti Karrekoski or Resident 609- 5th.Ave. S. Edmonds, Wa. ;8020 Dear Mr. Karrekoski or Resident: HARVE H. HARRISON MAYOR The City of Edmonds is currently experiencing a serious storm water problem. Our sewage wastewater treatment system is being overtaxed by large volumes of storm water from roofs, drains, driveways, and parking lots. If this water is not eliminated from the system, the sewage treatment plant will require expansion much sooner than it otherwise would. A series of tests were completed, identifying your property as one of the infiltration sources. This storm water must be removed from the sanitary sewer system as soon as possible. The attached drawings indicate several solutions to this problem, one of which should be applicable to your property. The City has established this as a top priority project, and your cooperation is urgently needed. Please contact Dan Smith or Jerry Hauth at 771-3202 for assistance prior to installation of your modified system. Sincerely, JAMES%,X,J ADAMS, P.E. City Engineer DTS/st Attachment cc: f ile fil Dan Smith Dt �)o L 0 T-/L) W 0 . --0 DF PRArg T.' SANIrARV IPS051-6m SeweK CUT 'p, PC Ct-,%%E'Nr OVV? 'AD -p El ao w � P I lz u- 6 1 wrl T-6 c- Tio -Vr-YVJE-LL. (r4l,5 15 S/MIOLI A AOLC r'ILLCV �%ijTjj 61r�AVCL 1. CVf 'r, f2j� 2. CkMCNr OV4:�( ATAIN ADD AND i?VN DRAIN ?IPE -ro Ak:rCjW,*yrcF' C I re. A0.0 trlliotV 7-10 OVO AOPQ-e' -1 Pll�ccl, tt/win"ot 4kv,4 11,4�qml /V Wv 4c 1 7. i�—� VevwELL w,rH (4AVE L- - I - cur F,pc-, -2. CcMeAj-r OVte— (::�1017M I*ILL SOLWQ-nt�l 1. COT DkAj/',J PJPE�' 2. CemCt4l- OV679 DRA14 K U N VJ A -rC P- TZ) SrOiz ?A VVATV-f- SV45-rCM cur pipc- �—Z CEAAL-4r ovcp- �Z, )zz -T b 5A #�J No-rE:.- Au- Woizv- or- To -6E- PO4C. coj 15E v ? ON =,ly c o P�j -r " c- r c, r-l- . T r< C- Q U % Q-A�: D WE EP- l�OLE'--'SQLU-rj6tj J�Z rEr3Aiz, C>Vcot- Cultf5 Cvr VvATE7'r-- Vrtom -��21 IVcti MA) :5 T- rz, e�-E-r- 10 E -VJ L �Z- MCW F'1106- (5 (,f�JV15,r- AND Virw cuzr3, ALL Wogy-- 16 C-XJ 5 6-0 C R ( T-O PL. , I'-'L-,(AA t r P- 2. wATv?2- VVHkF*P-C 'T- r-UAJ& 7-0 C-AT-Cri -73A5tp,/ OP-- VaAld- 0 MAY) YOO IVE-e9 TO ,, FA/G 11V&-(�71-IAI Fam yo ro/�' )/Oa. rO 4 7411AI 1'. .. j�7jV411VS'Ll-A"5- "OA15U"r"V67" 11V OZF 7-6,11 :�24 /t-/,4//v F-,O /W F/Y- 77-5--33�734- lz) V,-- z- '-' - f"q t 'F- -x L *y p CITY OF EDMONDS V ON, 0213 �UBLIC S DEPARTMENT., ENGINEERI# I IS1 78L APPLICATION FOR RIGHT-OF41AY CONSTRUCTION PERMIT THIS PERMIT MUST BE AVAILABLE AT THE JOB SITE FOR INSPECTION PURPOSES uompiete rarts A and b be issued at:(address or vicinity) Work to be done: /,,/ "A"" /,-a I'l-t U.-I, I I --;?I, drawing when applicable) ___J uired -- Start: Finish: Owner: Name Mailin- Address City State Zip Contractor: 0_,�2 Name C-6 Maill Address City State Zip 77S,' - 2Z2 Telephone Number State License Number 75' B, INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. Upon issuance of this permit, the contractor' is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the restoration by the Engineering Division. Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed, at which time a debit or credit will be processed for issuance to the applicant. Work is subject to inspection and restoration in accordance wit ity Code. A t City C 0 de - A 525 , ex sp ior wl D 24-hour notice is required for inspection by Engineering. Ca� 775-2525, ex . 220. az�= I understand that this permit must be avail for i ,able at the �ob s,te�for inspe ion purposes at all times. Signaturejw�z '7� �"�a t e Owner or Agent TO BE COMPLETED BY ISSUING AGENCY: 6 Date.Issued:_ —Permit No. :__,Zy-6x;< F e e 1116-. Security Bond: Time Authorized: S, APPROVED a t e 7 PUBLIC VORKS DEPARTMENT ACKLIST BUILDING PERMIT REVIEW (&ddress) (date) 0 Street Right -of -Way Exist' Z Access Easements Exist ------- H g34 Utility Easement Exist W Lot Per Subdivision Plat Assessor W Site Plan Checked for Accuracy Z _ Underground Wiring Reqd. H 0 Check A ur of Legal Description Z Review Date Existing Water Main Size Water Main Required Service Line Required Hydrant Size Existing 1:4 Hydrant Reqd Per Fire Co Size Detector Check Meter Reqd. Cross Connection Inspecti Fire Department Comum2Xn �3: Water Meter Charge Reqd. Review by. Date Septic Tank Design Approved Date Septic Tank Permit Reqd. Permit No. Sanitary Sewer Avail ility - Proj. Drawing No. File No. Side Sewer Availability Sanitary Sewer Connection e Reqd. :3: Review by_ Date Open Ditch Existing Reqd. Culvert Reqd. Size C4 Catch Basin Reqd./ Indicate on Site Plan 0 Shoulder drainage maintain collection on swale open runoff H W Manhole reqd. Indicate on Site Plan Soil Conditions and Ground Water Field Checked Review by, Date aer,.� Revised: 1vlO-1977 Page 2 Street Paving Reqd. Curb and Cutter Reqd. Sidewalk Reqd. Curb Cut for Driveway Reqd P4 Right -of -Way Construction Per�mi Bond Reqd. for Public LTprov ts Street Name Sign Reqd. Other Signing Reqd. Pre Permit Site Inspection made an 0 o-1 H BY: SEWER WATER F4Z STREET ENGINEERING Special Requirements listed in mem to Com=ity Development Department, Building Division > BY— M () ywgw� Date— - o All item filled in an Building Permit Application 41211-70 P4 BY Date Drawings Stanped and Notations Made PL4 BY EN Date -4 Approved by Public Works Department Revised: lv 10-1977 CITY OF EDMONDS -;J PUBLIAWS DEPARTMENTj ENGINEERftlVISION APPLICATION FOR EIGHT -OF -WAY CONSTRULTION PERMIT THIS PERMIT MUST BE AVAILABLE AT THE JOB SITE FOR INSPECTION PURPOSES " Applicant to Complete Parts A and B/ I '�-47' T Te 76 3: Irk A. Permit to be issued to: For Work at:(address or vicinity) Tfpf-- of Work to be done: (attach drawing when applicable) Time Required -- Start,:,- Finish: Owner: 111-TRT7-1 Name Mai 7 Addres ' uity State 7 _2 Zip Telephone Number Contractor* Name May-l" AM ress- 4�- City State Zip 6V I "' 2 3 - 0 / - / / -/ �> - S 1'41311 State License Number J62 - /3- 7r Telephone Number B. INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. Upon issuance of this permit, the contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the restoration by the Engineering Division. Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed, at which time a debit or credit will be processed for issuance to the applicant. Work is subject to inspection and restoration in accordance with City Code. A 24-hour notice is required for inspection by Engineering. Call 775-2525, ext. 220. I understand that this permit must be available at the job site for inspection purposes at all times. Signature: Date: "�k Owner or Agent TO BE COMPLETED BY ISSUING AGENCY: W D a t e I s s u e d Permit No.: Z6 N Fee Security Bon Time Authorized: /,C-5- APPROVED Date: 10--771v (Revised) 10 4o,11