Loading...
616 DALEY ST.PDF11111111111111 13924 616 DALEY ST ADDRESS: TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: DISCRETIONARY PERMIT #'S: DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): aaoo�,2� ("ki 41 PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: DETERMINATION: E] Conditional Waiver R Study Required E] Waiver LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED.-Ae 495� SIDE SEWER PERMIT(S) #: GEOTECH REPORT DA STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DATED: OTHER: Mf)v/ ini n f I r�&I.ArNA A i ftt;# tAA Q, LATEMP\DSrs\Fomis\Street File Checklist.doc '4e--� 6�-(Z-nrl U 1:` 77777­ us PERMITn OFEDMONDS ZONE NUMBE sso, -n-4 CONSTRUCTION PERMIT APPLICATION joe, ADDRESS TAME (O�NAME OF BUSINESS) & tmle —51A&—, i ka4L CC01j_&L4_ — LEGAL . . . RIP111. CHECK III MAILING ADDRESS a Aoqal— 'ELEPHONENUMSER PUBLIC RIGHT Of WAY PER OFFICIAL STREET MAP. lclthhl P7,5--.3 72 -PISTING� REQUIRED DEDICATION ROPOSED— NAME RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED C3 1Z STREET USE PERMIT REQUIRED C ADDRESS SEE ENGINEERING MEMO DATED CITY -4 NAME ADDRESS METEII I I BUILDING SU;,pj I SIZE FIXTURE UNITS —TELE CITY "ONE NuMaER . KS V. ATE UCENSE NUMBER AD B NO. SIGN AR EA ENV. EVIEW ALLOWED PROPOSED COM PLETE EXEMPT SHOREUNE# 0.1 D .. .11plIon Oc1,1,1npety.jnciud- all easements 'Dw four C VARIANCE OR CU PLANNING REVIEW By DATE AA- 011C f YARDS HEIG14T LOT COVERAGE ;6N REAR T SIDE 3 KS 0A1 PLUMBINI N E1UDEEN11IA AGG/ALTER COMMERCIAL El MECHANICAL REPAIR RETAINING WALL 0 MM CHECKED By EXCAVATE FENCE DEMOLISH OR FILL L_x—F", 4�/nl P111154MOVE D3PJ SWIM SPECIAL INSPECTOR AREA OCCUPANCY OCCXIVANT Rau LOAD REQUIRED G P REMODEL 0 YES C3 NO INSERT APT. SLOG RENEWAL MARKS WOOD STOVE NUMBER OF STORIES r.UMSR .1 IDWELLING I UNITS NATURE I VORK TO .1. DONE PIAC- PILOT PLAN' PLAN CHECK FEE f BUILDING do, PLUMBI-40 MECHANICAL GRADINGJFILL This permit covers wor to be done on private property ONLY. rL Any construction on t1,1e public domain (CU 'S , sidewalks, ARGE C.) will require separate Permission. STATESURCH Marquess. P�rmlt Ap 511cation: 10 Days ENERGY CODE Permit Limit: 1 Year - Provided Wc:rk Is Started WI*,hIn ISO Days ,,,,,Can, n bh,�! of hissrio Ir dpouse hed Irs, assigns and 1) a efend and hold 5 CdeE.O's eg.. n am lf�, 5 K�' ha Of fEdmonds, Washington its Official 'm'ess 'he City rom any and 8" Claim i effpl.y..,, and directly 0, indirectly IS ior damages of whatever nature. arising ro m the I suance of this permit. Issuance of this permit shall not be d.:med I. PLAN CHECK DEPOSIT modify,walve or reduce any requirement of any city ordinance �o nor limit In any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE provision." I hereby acknowledge that I have read this application; that the TTENTION APPLICATIOWAPPF16AL information given Is correct; and that I am the owner, or the duly A authorized agent of the owner. I agree to comply with city and THIS PERMIT This application Is not a permit until statelaws regulat!ng construction; and Indolng the work authorlz* AUTHORIZES signed by the Building Official -or his ad thereby, no person will be employed In violation of the Labor ONLY THE NOTED Deputy; and fees are peld. and receipt IS Code of the State of WashIn I gton relating to Workmen's Componsa- INSPECTION acknowledged in space provided. ; DEPARTMENT —DATE SIGNATUA 0 OR AGENT) DATE SIGNED F' "S SIGNATURE CITY OF EDMONDS DATE ATTENTION 171-3202 IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE ORIGINAL — File YELLOW — Inspector UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR J, A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC PINK — Owner GOLD — Assessor CHAPTER 3. 102-78 The City of Edmonds Side Sewer Drawing EASEMENT NO . ........................ ................... 214-05900 NEW CONSTRUCTION El REPAIRS D LID NO . .................. ASMT. NO . .................. OWNER....... HOLY ..... RO-SARY .... CHURCE ...................................... CONTRACTOR ...................... ........................ .......................... --------- PERMIT NO . .................... JOB ADDRESS --- EL6 --- DALEY-E-TREET. ------------------------------------- LEGAL DESCRIPTION: LOT NO - ---------------------- ............... BLOCK NO . .................................... .............................................................................................................................................. ................... iNAME OF ADDITION ....................................................................................................................... 0 is V DYE TESTED ON SEWER Approved: PWW-0001-11175 (REV.11178) DATE -------------------------------------------- By .......................... ---------------- ------------ —. e CITY OF EDMONDS LARRY S. NAUGHTEN MAYOR 250 51h AVE. N. - EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES PETER E. HAHN DIRECTOR May 22, 1987 i'llAY 2 6 1987 PUBLIC WORKS Mr. Michael O'Halley 20923 44th Place West Lynnwood, Washington 98036 RE: Demolition Permit #860314 616 Daley Street Thank you for your quick response to my letter dated April 28, 1987. A site inspection on May 21, revealed that although, the grass was cut back from the sidewalk a more permanent resolution to this problem is required. The sod that is overtaking the sidewalk must be removed to prevent future occurances. Also, the piping must be removed. The work must be complete wi'thin 15 days date of this letter to avoid the matter being turne*d over to the Code Enforcement Officer. Please call me if you have any questions regarding this matter. Thank you, Jeannine L. Graf Permit Coordinator ,-Xzcc; Public Works Director SITREET F/LE PUBLIC WORKS PLANNING 0 � PARKS AND RECREATION ENGINEERING CITY OF EOMONOS 2-50 5th AVE. N. * EDMONDS, WASHINGTON 98020 - (206) 771-3202 COMMUNITY SERVICES April 28, 1987 Mr. Michael O'Malley 20923 44th Place West Lynnwood, Washington 98036 RE: Demolition Permit #360314 616 Daley Street LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR Rusuc . The City of Edmonds continues to receive complaints on your property at 616 Daley Street. Please resolve the following items within 15 working days: 1. Miscellaneous piping and debris must be.removed from the site; 2 Grass is overtaking the City sidewalk, this must be removed. Failure to do so will result in the City clearing the walk and billing you for the work,- 3. Chapter 6.20 of the City Code 'requires that commerical or multifamily zoned property be properly maintained. Please remove the weeds and provide a general cleanup of the site. Failure to complete the work within 15 working days will result in the City�'- 1)clearing the sidewalk and billing you for the work: 2) turn the matter over to the Code Enforcement Officer. Please call me if you have any questions, 771--3202.:... eannine L. Graf Permit Coordinator JLG: amm CC) PUBLIC WORKS PLANNING PARKS AND RECREATION ENGINEERING 0 Engineering Report for 6/01/83 ADB Meeting Page 2 ADB-38-83 AGENDA: ADB-47-83 0 b *111�1446* SOON BO KWON - Review of site ' - elevations, and landscaping for office/retail building at 8410 Main St. (BN) The parking layout as proposed appears satisfactory. All unused curb cuts wi'll have to be removed, and the curb/gutter/ sidewalk brought up to City standards. Underground wiring is required to new building. An approved development plan is required, plus the appropriate bonds, priorto issuance of building permit. BRUCE LINGLE - Review of fascia sign for auto body repair shop at 223-27 Highway 99. (CG) No-commen t. ADB-42-83 LMIXE 0"MALLAEY-.7 Review of site, elevations, and landscaping for eighF--unif-'condomi'nium at 616 Daley St. (RM-1.5) The site layout as submitted appears acceptable. The alley adjacent to this development will have to be improved by this project or in conjunction with an L.I.D. Underground wiring is required to this project. Also, an approved development plan plus the appropriate bonds will be required prior to issuance of building permit. Also, the abandoned water meter vault in the sidewalk on Daley St. will have to be removed. DS/tq -CC : file ��KIX4 24 17112 Ims SrRe8 P/L r P.WORKS ENG. CHECK ITEM COMMENTS/REQUIREMENTS APPR. DATE APP. DATE A.Prior to IN Field Check I.O.Street Map 1AJ jll,� (dedi cati on?) 2.Deeds Map ----------- 3.Easement Map . . ...................................... 4.Assessors Map Adjacent Plats and subs.(reqts?) Comp. Drainage Map/Plans :)�Wa ter sys Exist./proposed Hydrant? 9 77A-f) 1,AJ Loop? Upgrade? `�.Sa-n-.Sew—er 7 Existing? Proposed? L.I.D. Assess? Backflow? 7. Wiring .�-Field Check I.Access Physical 2.Access Utility 3.UrIveway 2% to P.L. 14% to lot C.L.Profile Req? 4.Slope/Topo. 5.Rockery/Retain- J.ng Wall 6-Turnaround req? C.Public Improvements 1. Sidewalk/ Plantstrip 2.Curb/Gutter Y.- RO-Yd -.16'n-a Tin7__ 5 . I Yi—e T-M—a Hydrant _�_e _r -6—.S 'an . w e 7.Storm 8.Wiring 9. M6—n 'ume �t —s— C r—y( S . CV I CW/tAPV I Uva.1 UV UtUctr Lilit H LS 1. Planning Dept 2. Public Works 3. Fire Dept. 4. Engineering r Eems 1.Development Plan As -Built Received From 2.Recoded Documents Received 3-File Purged & Complete From 1 04% 0 0 SITE SKETCH File # Address .Additional Information: