Loading...
640 GLEN ST.PDF11111111111111 11425 640 GLEN ST Sq---.! -,,- -i hLE17 FILE 0 Mechanical & Civil Engineering 17815 S.E. 146th Renton, WA 98056 (206) 228-4244 STORM DRAIN FOR: CALCULATIONS TURRET APARTMENTS PREPARED BY* -e RICHARD E6. STUTH P.E. ,Waft V�z Ci 4**;f % 14b irk IbIft "t, 7-- S E P 2 19 19, 8 8 E NIG 1 N E E R I N G REC E I VE D #OV 11988 PUBLIC WORKS Washington State registered mechanical and civil engineering corporation A T-Olr �4 10 64,-S, 'Tu t-p—cr PMLT-�-ir—H-r�.s Flot-io"o-s, -4r DA-r A, A 00 A A PS-t-M AR,E-A M PC LM.. .0 0, 1 CF I T,- 10 4- C- V6 L—1 H G. LE6 1 4-4— J�Jl TC, PA6f. �40# JC> e, A Ik/ ^'6c A L v . eN.O. J,-7 14- 4- 10 4- -7S. WA L4 C, C f4 'GA L Cv L- A 7- NNW (F- p- 0. o CAL-C.CJL.ATE t-0l A)(* 4 L (- 0 ---A 8 L-C 0,08 1-7 4� C.OFS �- = — Ls- (F r-A o" F) 4,4 1 PJ vs V4 - 36o-27- 74- + Z,,5' 4 4.4 4-0 ,74 (13 87, c>) (0. Z—Z..) Y-31� .? VT- _Z,� �, F- r LT U M F+- 3 2 41,4.9 L, F. 4�:�r -d 0 0 14, W Ey C). C-) C), o -7 57) '0 A 74 L) <zz> E-.O Y,4 r=- L E 9. 1; H I-ELE-V. 96,7S N 4 QTD=T MU C- IRFECEIVED it of Edmonds y fa In J' 17 RIGHT-OF-WAY CONSTRUCTIM' ENGINEERING PERMIT Permit Number: &71-423 Issue Date:-2, A. Address or Vicinity of Construction: I-r-- 4" 9 9 B. Type of Work (be specific): 11V-9-,fte— 4WOW 4W,95 41:�--59 '94-6;-"S-r A~ C. Contractor: —5czNpS441\W e-mo- &)tjT1tArTo1L5Contact: 6enez-ne F&ap-O'GIA A Lx-J Maili - ng Address: q I I c A tt!tr 120. C-lopAnjoS Phone: 7 7 5-- C/ ZL I - State License #: F,12 A 0 Liability Insurance: Bond: $ D Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. F� Commercial F1 Subdivision El City Project 2-�Utility (PUD, GTE, WNG, CABLE, WATER) eMulti-Family E] Single Family E] Other 2>,;�:��l X,-e7a- 4eAtR:5:�> 577- INSPECTOR: 4,(- 4;��'�J INSPECTOR: F. Pavement or Concrete Cut 31yes 0No G. Size of Cut: 30 x *0 H. Charge $ APPLICANT TO READ AND SIGN INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City ofEdmonds harmlessftom injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeen, that may be made against the City of Edmonds, or any of its departments or employ- ees, including,or not limited to the defense of any legal proceedings including defense costs, and attorneyfees by reason of granting this permit. THE CONTRA CTOR IS RESPONSIBLE FOR WORKMANSHIP A AD MA TERIALS FOR A PERIOD OF ONE YEAR FOLLO WING THE FINAL INSPEC77ON AND ACCEPTANCE OF THE WORK ES77MATED RESTORA77ON FEES WILL BE HELD UN77L THE FINAL S7REETPATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PRO�ESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Department- 771-3202. Work is to be inspecte ' d during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. have read, tyhhebove statements and understand the permit requirements and the pink copy of the permit will be available t ti on site at all i esfor inspectio , rP9 n pyr ys- ;� 5i X&Y Signature: 1-1� Date: (Contractor or Agent) CALL DIALA-DIG PRIOR TO BEGINNING WORK PERMrr. FEE:, RK ISSUANCE Engrg. Div. 1991 FIELD INSPECTION NOTES (Fund I I I - Route copy to Street 1�eoQ.' Comments:, Diagram: 0 1 CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Viv. Ju 890 . jo4 NLL' CITY OF EDMONDS LARRY S. NAUGHTEN 250 - 5TH AVE. N. - EDMONDS, WA 98020 - (206) 771-3202 MAYOR COMMUNITY SERVICES: PETER E. HAHN Public Works * Planning e Parks and Recreation e Engineering DIRECTOR February 22, 1991 John Mellor 606 Sater Lane Edmonds, WA. 98020 Re: 640 Glen Street Apartments - Drainage Plan The following items on the Glenturret drainage plan still need to be addressed: 0 Show extent of utility easement at 629 Glen Street 0 Identify dashed line between CB #2 and CB #3 0 Add note on drawing requiring contractor to call for utility locations 0 Provide maximum invert at CB #6 (or note to provide at least two (2) feet of cover over pipe) 0 Verify length of storm line between CB #5 and CB #6 0 Designate acceptable storm drain materials If you have any questions, please call me at 771-3202. JAMES C. WALKER, P.E. Hydraulics Engineer JCW/sdt 640GLEN/TXTST530 Al berts 0 IncorporatedAugust 11, 1890 0 Sister Cities International — Hekinan, Japan S71-ICET FILE 3rad-dhaw GENERAL CONTRACTORS 911 CARY ROAD - EDMONDS, WA. 98020 - 775-9227 8-29-90 Mr. Bobby Hills RECEIVED Superintendent of Public torke City of Edmonds AUG 3 01M Dear Mro Milleg PUBLIC WORKS This letter is about drainage from Glen ste to the storm system on the Salamonsen-property. In exchange for a easement to install a pipeline to hook up the retention system at 64o 4,reng Iwill repave the driveway 131 x 951 plus a now dorete-driveway approach on the Salamonsen propertye I*would like to do this work as soon as given permission by the oitye We will diturb the property for the shortest time possible* Thank You George Bradshaw 890 . 1 9 CI CITY OF EDMONDS 250 - 5TH AVE. N. - EDMONDS. WA 98020 - (206) 771-3202 COMMUNITY SERVICES: Public Works * Planning e Parks and Recreation * Engineering E C 2.4 1 V 'EZ D MAY 18 1990 May 17, 1990 ENGINEFRW George Bradshaw 911 Cary Road Edmonds,'WA 98020 Re: 640 GLEN STREET APARTMENTS Mr. Bradshaw: LARRY S. NAUGHTEN MAYOR PETER E. HAHN DIRECTOR Your file has been forwarded to me for review and resolution. Our records indicate that the City has contacted you numerous times to serve notification that your building may not be occupied until a final occupancy inspection has been performed and a Certificate of Occupancy has been issued by the Building Official. The City has displayed great tolerance in an attempt to resolve this issue without the need for official action, but, as of this date, we have received no response to our request. Therefore, the City is now prepared to take action to complete the unfinished work on your project if no resolution or agreement is reached within the stipulated time. To avoid seizure of your cash bond, you must take the following action by May 31, 1990: 1. Completion of the connection of the drainage detention tank to an approved drainage system; or, reach a signed agreement with Bob Alberts, City Engineer, for the completion of that system within a reasonable period of time. 2. Schedule and pass a final building inspection. If conditions listed above are not satisfied by May 31, 1990, it is the intention of the City to complete the work required by the Engineering Department and to assess the cost against your bond. The City has verified that the performance bond funds held by Family Savings are available for takeover by the City. If the cost of the work should exceed the amount of the bond, you will be responsible for the difference. Incorporated Au gust 11, 1890 Sister Cities International — Hekinan. Jar>an 0 George Bradshaw May 16, 1990 Page Two If you have any further questions regarding this action, feel free to contact me at 771-3202. Richard R. Mumma Building Official RRM/sfn cc: Mary Lou Block, Planning Manager Bob Alberts, City Engineer City Attorney Bob Rose, Family Savings BRADSHAW/TXTCSPLN a I ,,, 8 C5 go . 19 0 0 CITY OF EDMONDS CHROtj Cop y LARRY S. NALIGHTEN 250 - 51 H AVE. N. - EDMONDS. WA 98020 * (206) 771-3202 MAYOR COMMUNITY SERVICES: PETER E. HAHN Public Works * Planning 9 Parks and Recreation * Engineering DIRECTOR February 22, 1991 John Mellor 606 Sater Lane Edmonds, -WA. 98020 Re: 640 Glen Street Apartments - Drainage Plan The following items on the Glenturret drainage plan still need to be addressed: 0 Show extent of utility easement at 629 Glen Street 0 1 dentify dashed line between CB #2 and CB #3 o Add note on drawing requiring contractor to call for utility locations 0 Provide maximum invert at CB #6 (or note to provide at least two (2) feet of cover over pipe) 0 Verify length of storm line between CB #5 and CB #6 0 Designate acceptable storm drain materials If you have any questions, please call me at 771-3202. JAMES C. WALKER, P.E. Hydraulics Engineer JCW/sdt 640GLEN/TXTST530 0 Incorporated August 11, 1890 9 Sister Cities International — Hekinan, Japan Z 0 U C4 0 V* CITY'OF EDMONDS: C*MUNITY SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT f�aEET FIL& ermit No. Issue Date 7 A. 9 Owner: 67 C 6 146 r5 61Z,4,0S,4,J W B. 0 Contractor: 9 (Z P, o,5 A P, LQ tQ 5- 1( A L_ 71 Name Name — q-11 c,416y lZo4V 15�// C,41ey IZ6,4a Mailing Address Mailing Address _ev"o 'Va 5 MA. -79 0 0 .A1,4, q'90Z C) City State Zip City State Zip 6 C, -8 4 6, 1767- e-9 Z Z 7 State License Number Telephone Number C. 0 Address or Vicinity of Construction: 4- Type of Work to be Done: A L L_G D. 0 Work in Connection With: Sub or Plat 0 Single Family El City Projects' El Commercial ;?"Multifamily 0 Utility E. 0 Pavement Cut:-, El Y Z"N F. 0 Size of Cut: X APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmo*nds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. * A 24- hour notice is required for inspection; Please call Engineering: 771-3202 e Work is to be inspected during progress and at completion. 0 Restoration to be in accordance with City Code. 0 Street to be kept clean at all times. 9 Traffic Control to be in accordance with City regulations. All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above pd that this permitmust be available at the job site for inspection. purposes at all times. Signature:. A'0yJ'-" 4. Date: Owner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Beginning Work APPROVED BY: _D7 (C7 Time Authorized: Void after _-� 0 days. Special Conditions: RELEASED BY: Date PERMIT FEE: Restoration Fee: Receipt No.: * '1_6 G i, 3 - Fund I I I Fee: Street Cut Dimensions INSPECTED BY NO WORK TO.BEGIN PRIOR TO PERMIT ISSUANCE x Date Eng. Div. March 1989 FIELD* INSPECTION NOTES (Fund I I I - Route copy to Street Dejt.) 11 Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: E) NO Eng. Div. July 1985 .:;r co CD (A cu CITY of EDMONDS For Inspection Call 771-3202 Address of Construction: (�-� ( S I D E id"'ET FLE 61 ue� �J SEWER PERM,IT PERMIT NO. ': I Property Legal Description (Include all easements): &mn�er_.� _p'r /C)r-S /S- Owner and/or Builder: git,_\os i� ALxj Ki rz-:tL+x, L_ C_ c K� —, ?. 1�, c- -r-n , i-, c . Contractor & License No: & 12- N o S C-, C_ , -�, 4 (,-, P S Single Family Residence EDMONDS MENT PLANT Multi -Family (No. of Units 1.TREA'J'= Commercial (No. of fixture Units Invasion into City Right -of -Way: No Yes (If Yes, Right -of -Way Construction Permit required. Call One -Call -Center (1-800-424-5555) before any excavation.) XW p—le 0 Cross other Private Property: No Yes (If Yes, easement required, attach legal description and county easement number.) PLEASE READ THE ITEMS LISTED ON THE BACK R E C E I V E D JAN 12 1989 I certify that I have read and shall comply Date with the items listed on the back. PUBLIC WORKS Permit Fee: Trunk Charge: 150.00 Assessment Fee: Issued By: Date Issued: Receipt No.: _C7 91A Partial Inspecti,on: Comments Final Inspection Approved: A Date Initial Rejected: eason ** PERMIT MUST BE POSTED ON JOB SITE ** Date Initial Date Initial Wh.ite Copy - File Green Copy —Inspector Buff Copy - Applicant The, City of Edmonds Side Sewer Drawing EASEMENT NO - -------------------------------------------- NEW CONSTRUCTION Rr"' REPAIRS F� LID NO . ................ .- ASMT. NO - -------------- OWNER — --------------------------------------------------------------------------------------------- CONTRACTOR -------- 3 ------ k .... PND-SAAW -------- ---- PERMIT NO. JOB ADDRESS -(,e4.0 ----- - ig ------ --------------- --- LEGAL DESCRIPTION: LOT NO. --- 15 ...... BLOCK NO - -------- --------------------------- -------------------------------------------------------------------------------------------------------------------------------- ---------------------- Fpi\j0ND NAME OF ADDITION ------- Y,5:-'T---c ... . ........................ ------------- Gx �' cs r'k 5T. (,;r—lb WW= 'ZID12- CA,? b4f Ap—c- 0 t PkbzLq,-r4 I PWW-0001 -11/75 (REV. 11/78) A, 10 I TO Approved: t44qV-L0.W D DATE ... ............... By --- C-' Par4 1—N W", E_ Z U >4 0 U W 14 0 1-4 Z 0 U 1:4 0 114 CITY OF EDMONDS r7i Permit No. COMMUNITY SERVICES DEPARTMENT STN' EET FILE Issue Date RIGHT. -OF -WAY CONSTRUCTION PERMIT A. e Owner: &C-0216zr A-1-4,25,41140J B. 0 Contractor: Name' e_1 / r C A Mailing Addresi —1!:Z,I A,11 6 A) 1) 5 ot) A City State zip '�� A A A 15: Name Mailing Address City State Zip 9 IZA05 6 C ?, 4 C. PS -7 7:�—�-F Z. -L7 State License Number Telephone Numbir 9 Address or Vicinity of Construction: (14 0 K-T LC- &J Type of Work to be Done: rz (K) r!:; 0 4-otie_ uP L-T A, L_ L_ i�- y I Work in Connection With: 0 Sub or Plat 0 Single Family 0 City Projects 0 Commercial . 5�'K4_ultifamily 0 Utility Pavement Cut: 0 Y QN # /f 9t?69 7_7-�� APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant., 1.11 • A 24 hour notice is required for inspection; Please call Public Works: 771-3202 • Work is to be inspected during progress and at completion. • Restoration to be in accordance with City Code. • Street to be kept clean at all times. • Traffic Control to be in accordance with City regulations. • All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; no exceptions. I understand the above and that this permit must be available at the job site for inspection purposes at all times. Signature: X L_* 1, C Z4-Ld f— — Date: 61 Owner or Contractor This Permit Must Be Posted at the Job Site For Inspection Purposes Call DIAL -DIG Prior To Beginning Work ISSUED BY: Time Authorized: Void after days. Special Conditions: Amendments: PERMIT FEE: Security Deposit: Receipt No.: M/2 Fund I I I Fee: Street Cut Dimensions: X NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. July 1985 J% FIELD INSPECTION NOTES (Fund I I I Route copy to Street Dept'.) Comments: Diagram: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. July � ol 4 "v- 3-W 4, /" yn� 7,2 PrW2V AV- v -- - ------- - -- ------ --------- 17 ILE r-T R P-7 N 7Velerr,�W#X-9 rM&Alr f ko Jr- 7 6&lvrl4i5� --t- ',�Owlo xarlpf 7P //v W/ or Aox�,vclm. oV-4WOZ? VIV, &:�IWIY 57-7- :0164 lyvlv�/ 11)MMY 7;YC- 774.)o 11V61(111jae.11(-1W-1- Vr 4 1104e5 -r1104)14 A?C— lf6 --JI6410. 666W 87 S; lJog lv� r 4,�),qe7-Me-W 7' dr &Ile �4&7 601:2,g Car 411eAl CITY OF EDMONDS 2<EW ADDITION RETIREMENT ASSET INFORMATION SHEET ASSET NO. 5" ADDITION TO ASSET NO. DESCRIPTION SERIAL NO. LOCATION DEff. NO. * * PURCHASE ORDER NO. PURCHASE ORDER DATE COST B.A.R.S. ACCOUNT NO. ESTIMATED LIFE INITIATED BY DATE PROJECT NUMBER 0 PROJECT COMPLETION DATE COST "7aff APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY ff'DEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT G.L. ENTRY REFERENCE D.ATE INITIAL tnp DEPARTMENT FILE Z . VERIFIED BY PROCESSED BATCH NO I APPLICATION for The City of Edmonds SEDE SEWER PERNaT EASEMENT No . .......................................... NEW CONSTRUCTION E) REPAIRS 0 114-07700 OWNER........... p.! ..... qW��n-s-q.n ................. .................................... CONTRACTOR .................................................................................................. PERMIT No . ...................... ADDRESS........ 6.4.0 .... Q.I-Qn ... ;3t ... ............................................................. LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................ NAMEOF ADDITION ......................................................................................................................................... Dye Tested On Sewer 1972 Approved: DATE................................................ By ...................................................................... I I I EN C.B. #2, TYPE 11 G.E.=102.5 I.E.=96.75 A C.B. , TYPE 11 -Z tj 9 A SPH VIN G-. A 'ALT ?A� PO�T CARPOD AIS) a- (4 SSP,A, 6 M a 0 A C3 APARTMENT B 13 GARAGE (3 CAR' EL. 108.0 ASPHALT 'PAVING. CARPORT (3.$PACES) 11 all A L D :00 I fWaft n *0 n C.B. #1, TYPE I I.E.=97.0 EL. 106.0 EL. 104.0 V Pvc (SEE NOTE #2) EL. 102.0 G.E. 101.0 50 LF. 30" CMp m LL_ .9-0.00., 0- zi '' . I" Lo M 1-4 > kh LL- 0 M M Lo SIDEWAK EL. 100.00 V_ DATUM POINT FOR REF. ONLY ----------------------------------------- GLEN STREET ,PLOT PLAN SCALE: 1 10'— 0"' STrREET FILE 105 100 IN 50 C_MP, 9� $�=O.QQ5 Fl� �f7` ze 95 5 L.F. 12" CONC 90 STORM' PR�2FILE HORIZ- 1 110 _VE'R T 6" PVC (SEE (SEE NOTE #2) 50, L.F. 30" DIA_CMP 12"R Z, 4.) P C 6 v CB #1, TYPE 11, 48" DIA. 0 OIL/WATER SEPARATOR CONTROL DEMCE cj� SOLID LOCKING UD OFFSET CHAIN-400# CAPAC' SLACK`WHEN DOOR IS OVER LADDER AS SHOWN IN -PLAN �-GR TEI 'fflAMF`*­ I A , . v)_ CLOSED TOP 102.5 MIN. OFFSET OVER LADDER CT ''TOP AS SHOW IN" PLANL:�. 101' 10 MIN Z'i 0 W -TNV. 96.75 INV. 9 1 7.0 24" MIN. 24" MIN. b J 12" CMP CROSS WITH SNO. CO. 24n MIN. 50 LF. 30" cmp 0 0.005 FT/FT 24- MIN.' APPROYED GATE I 1/�'DIA. ORIFIC STD. GALV. STEPS �STD. GALV. STEPS 48 4W' M MIN, Z SECTION A -A 0 ui 0 SCALE: 111 51-0 U) (D co DATE 9/19/88 DRAWN RTC CHECKED 5WG. NO. (TUR-1) 880302 SHT. 'OF