MEMORANDUM
Date: October 16, 2015
To: Jennifer Lambert
City of Edmonds
From: Andrew Reaves, P.E.
Principal
Subject: Wiskerchen Residence As -Built Utility Plan
Dear Jennifer;
Attached'please find the second submittal as -built plans for the Wiskerchen Residence, located at 645
9th Avenue N. I have responded to all comments in your October 9, 2015 corrective Notice. I have also
re -ran calculations for the as -built storm drainage infiltration trenches with the additional offsite
driveway area accounted for, using the required PS 36 East precipitation time series All other
corredions to the model as requested by Jerry Shuster have been made. All trenches infiltrated all
flows 100% with the design infiltration rate provided by the project geotechnical engineer. See
calculations for the trenches in appendix A.
Julian Liu, the project geotechnical engineer, has provided an as -built memorandum per your request, it
is attached in Appendix B.
COMP WITH APPLICABLE
=RMWATER. CODE
�Yate. (-�ld
71W5
meeets-f" s-to
SDA 1724 W. Marine View Drive; Suite 140 P: 425.486.6533
Everett, WA 98201 F: 425.486.6593
Jennifer Lambeil
October 16, 2015
Wiskerchen Residence As -Built Utility Plan
Page 2
Appendix A - As -built infiltration calculations
1724 W. Marine View Drive; Suite 140 P: 425.486.6533
SDA Everett, WA 98201 F: 425.486.6593
Jennifer Larnberi
October,16, 20'15
WisKerchen Residence As -Built Utility Plan
Page 3
R
r& Eda Wi� Help
-----------
R�oid
Move Elemero
i� x9l Lwd
.! L I'
__j
A
94 MffQatQ1 r2n,= �_
6#5.� L f4figated
Subbasin Name B f r90iFI@'P0C-1
stuface Idedl..
Flows To: Gi;;;i*fi �Be&l Gi;;WT,��Badl
Area in Basin
Available Pervious Avaidable Impervious
PeiviumTolal [ = Actes hpwvious Toial F1 Amer
BasinTotal [0L:1 Actu
jaan'=� I DeseW Zero I RAlano Av IF GO I
This is the basin to the infiltration trench, i the additional driveway area added, total area to trench is
0.15 ac, which includes all the offsite driveway areas and roof area. .
1724 W. Marine View Drive; Suite 140 P: 425.486.6533
SDA Everett, WA 98201 F: 425.486.6593
Jennifer Lambert
October 16. 2015
Wiskerchen Residence As -Built Utility Plan
Page 4
ai�M'ANGI
Atc Eda Vim loom Help
DG9&1 Sty :ARk.
chern.tic
@
IS'- Gwml 1,en,I 10 1 l`JI't;g'tttJ
Facility Name F�� IT�- hL6j C1
Outlet I Outlet 2 Outlet 3
jWr P,ad.,d .. d
Downstream Connection
Facility Type
I— precipitation Applied to Facilly OuickTrench
-op
Facility Bottom Elevation (Ift) 10
Runscanwo
'171 FMOMTQ
UNION
Facility Dimensions
I
Trench Length Outlet Structura
Trench Bottom Width 4� Riser Height (h) R5
Riser Diameteifin)
r
Effective Total Depth 4,15
Rise, Type
FFW
Bottom dope ol Trench 01=
Left Side Slope 0 Notch Type
Rightsideslope
Material Layers for
Layer 1 Thickness (ft) 4.5 Orifice Diameterl-leight OMax
Layer 1 poinify (135 Number (in) (Ft) [GIs)
Layer2TIricknestIft) 0 .1 0
Layer 2 porosity 0 2 fo— fo 0
Layer 3 Thickness(ft) 0 3
Layer 3 porosity 0 '..
Trench Volume at Riser Head (acm4tj .308
Infiltration
-Movalilements,
Pond Increment
Measured Infiltration Rate fin/ho) F4
LrdLku�tion �educticn Factor ShowPondTable FdpiTable
Use Wetted Surface Area (sidewallt) --J
SaL. jI
J
T otal Volume I nfilliateclacre4l) 57.291 Total Volume Through Facility(ame4t) 57.291
_j
T.WVoLrmeThioughRi,er(hj 0 ImcenlInfitated ion
This is the WWHM3 model after it has routed all rainfall events thru the trench, as is shown in the
bottom right hand corner, the events infiltrated 100%, using Julians 4 in/hr design infiltration rate. This
is utilizing the Dot time series per city of Edmonds code- supplement in chapter 5.7 (Puget sound 36
precipitation)
r,
1724 W. Marine View Nive; Suite 140 P: 425.486.6533
SDA Everett, WA 98201 F: 425.486.6593
Jennifer Lambert
October 16, 2015
Wiskerchen Residence As -Built Utility Plan
Page 5
Appendix '13" - Geotechnical Letter of Site Stability
SDA 1724 W. Marine View Drive; Suite 140 P: 425�.486.6533
Everett, WA 98201 F: 425.486.6593
LIU & ASSOCIATES, INC.
Geotechnical Engineering Engineering Geology Earth Science
October 15, 2015
Mr. John Wiskerchen
16531 Broadway Avenue
Snohomish, WA 98296
Dear Mr. Wiskerchen:
Subject: Certification of Onsite Stormwater Disposal System
Wiskerchen Residence
645 — 9th Avenue North
Edmonds, Washington
L&A Job No. 12-069
Prior to its development the Subject property had remained vacant for many years, and the
property and the rockery lining its west side had remained stable for all those years. The
total amount of stormwater failing on the property in its pre -developed condition was
basically the same as it is under the current developed condition, except that stormwater
now is collected and reintroduced into the ground through infiltration trenches and
drywell. In order for the groundwater flow pattern under the current condition of the
property to simulate the pattern of the pre -developed condition, we recommended that the
infiltration facilities be spread out over the property to minimize potential concentrated
groundwater flow and, therefore, minimizing potential of groundwater seepage.
I
The stormwater infiltration system was completed in April 2014, and it has undergone
one full winter cycle. Since then, there has had no signs of erosion or soil movement or
groundwater seepage within the property, and the rockery and slope below it have
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746
/I
October 15, 2015
Wiskerchen Residence
L&A Job No. 12-069
Page 2
remained stable. Based on the above, it is our conclusion that the as -built onsite
stormwater disposal system has performed and functioned as designed.
Please feel free to contact us if you have questions.
, t P—'TG—.q - " it.
Yours very truly,
LIU - SSOC
J. S. (Julian) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
LIU & ASSOCIATES, INC.
S
-2k E
TP
0
inca, f.
Cert ttl Ccui)ancyl
4
Pl
his c rtific�' sue d in ac coida fic- 'ith the requirements of Section 111 of,.the,09 International Building Code,
e is is .,e,,w
I.Y lIg L at at t V bbU4U%;U - b.a lIg V� III iy I Ub VIMU Wilb ll-UU p lance t t; e a p cable provisions ol
p
the codes4and,ordinaficeg of th&"c'.I*q&gpl ti Ly-.construetion and use of '�64diriis�
h b
--Dciscrig)tic)h�:�'6,4:�,-r�Siiicile Family Resideng6�m6v�
Site Address: 645 9TH AVE N, EDMONDS PeIrmit No: BLD20130595
Construction Type: VB Parcel -No: 00756500001000
Owner: JOHN & PAULA-TROST/WISKERCHEN Occupancy Qroup: R-3/U
4-,
645 9TH AVE�NUE NORTH
r
EDMONDS, WA 98020
11/12/2015
�'( j uildihg�Q
B fficial Date 1,4sued
POSTIR A CONSPICUOUS, PLACE"
EX. 10' CITY OF EDMONDS
THE NW 1/4 OF SECTION 24, TOWNSHIP 27 NORTH, RANGE 09 EAST, W.M.
UTILITY EASEMENT/PER PLAT//
A.F.N.,87060950 63)
EX. S PRqP6SED
S 41NE MAX,/BE P
RESP0k§IBIUTy/,'bF APP ED 6� 5.00 PARCEL NUMBER LOT AREA LOT SLOPE
LUG EX. 15' INGRESS, I
TO VERIFY &,/CORRECT, EGRESS & UTILITY - 0
00756500001000 12,198 SF 21 % (AVG.) 9
31 N/'89*3SO5" E EASEMENT
(A.F.N. 84b4260226)
PROPOSED/ N-89'53'55" E
'IL 'a& z
FOOTING bRAIN 21.00' Applicant shall repair/replace all damage to
J-;;'F4 IR Q1 -4 1 :- -0 — — — — — — utilities or frontage improvements in City
4 .. .........................
C� right-of-way per City standards that is caused
r�m oam G IF Al /
-&iC/P/E- E or occurs during the permitted project.
Pr"-1 Tn!E�/.s rV CUNCHE
DRIVE
cuuwau-r "__QtW
K
CONSTRUCTION SEQUENCE NOTES: K
Ti — — 1. ;; a .<
PROPOSED
3
L; CATQH1 N 56*16'55" E 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING
S v
-RIM:'127.25:, 8.96' DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE
�'['E- 124.25'
>1 IS REQUIRED. (INS OCX-Vetb-
ITO
'.-AMMLIM DrwEWAY SLOK 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROLNOTES.
TY LOCATES.
3. CALL FOR UTILI
PROPOSED ALLWED 14% 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE
Cf)
VW�1'1) PATIP C\1 C PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATIONOUTSIDE
DRK,N GRAV�L THE CONSTRUCTION ZONE.
>
TRENCH WITH w I - 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS
1< <
PERF PIPE 7 co a- 0 CITY ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND
I 11_� w, 0 C) I Ln
I U C� 0 M
1v EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED E
z0.
(TY'P PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND
R�R DETAIL,' C' T_ C
C\1 SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE
SEE SH.EETILq3.1
7--
M
M MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED.
6. DEMOLISH EXISTING STRUCTURES
10) 5' E
11 LOWER FINIShl) FLO& EL. 118.' �0
1P 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 0) CD
10 0
U') MAN FINISHIHED FLOOR 128'
k; 0 -(\I 8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS D
'00 2
GARAGE FL R EL. 27.83' NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY C
10 'CO ti
OD —1 AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE
BIR PROPOSED
CLEANOUT STABILIZED PER EROSION CONTROL NOTES BELOW) U 2: 2
C.4
(TYP)I 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING
FRONTAGE IMPROVEMENTS. >
13. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO
PARiIALLY� 'OV
>
ER / D REVEGETATION OF ENTIRE SITE.
PA�01
14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL
2 1 / 3;
TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON
CN
DIAM.�,p YWELL FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR.
RACTO
/FOR PAT19 R�NOFF CONT R TO FIELD
VERIFY LOCATION AND SIZE
C I
PER DETAI T <" 9> AtL_ New wriu-nez, 5wvLx. ee
SEE/SHE " t3.1 - - - - - - - - - - OF EXISTING WATEL!ERVICE
. .......... - - - - - - - - - -
1z 11 1 1 7_:��_W_w_ - DRAINAGE CONSTRUCTION NOTES:
x - I ;��' ___ _w W_ w
w w
z
z w
ELEVATIONS SHOWN ON THIS PLAN ARE NOT AS -BUILT. FIELD
z
51 'L.4.5'Wx4.5' DP
N E 105.18' (D VERIFICATION OF DESIGN IS REQUIRED. >
EX. 5' WATER z
6" PVC STORM TIGHTLINE INFILTRATION TRENCH 0
EX. 10' UTILITY — EASEMENT 2 Z.
BOT EL. 123.50 APP VED BY ENGINEERIC ROOF DRAIN CONNECTION SHALL HAVE POSITIVE GRADE ON
0
TO INFILTRATION TRENCH (TY1 EASEMENT PER DETAIL (A.F.N. 2044321) ELEVATION SET SO SURCHARGE FROM DETE+iT494 SYSTEM IS NOT A . 1�
)-r1"_STAL-L_ a0CV_ PPrO AS N (A.F.N. 8010200315) SEE SHEET C3.1 POSSIBLE. THIS WILL BE FIELD VERIFIED. -3r-1LTn-PrtI1CW LLJ
C1,31W-7 0
PrZercur T-kE SLwc- iF r7taiF sys-rom 06S1�7LVA-rioA.1 wEv_ Tb )SC z
51+VVLO PM IDOL 5T;,1N0AV42S- w
SEWER CONSTRUCTION NOTES: Date: 11-1-7 0113. z
THE CONNECTION TO THE EXISTING SEWER LINE SHAL i L BE MADE A MINIMUM OF 3' NORTH OF THE CLEANOUT -f5-r01zM SYSTtm 19 eS 16 W eD
cl)
(D AT THE PROPERTY LINE. (5CC- W&-e T C_Z 0 LU CL
5 'R E S U 0934 LLJ
6 THE PIPE MATERIAL SHALL BE 4" DIA. PVC. :SiPe 5e7Q0Z- FaOM TI�W rV THIr OXF_ L)F &09WM03T1Pa0(;0Vry GW& STREET FILE
a THE CLEANOUT AT THE PROPERTY LINE SHALL HAVE A 12" CAST IRON LAMPHOLE COVER WITH J" HEX BOLTS. SEP 16 2013
N z
A CLEANOUT SHALL BE PROVIDED WITHIN 2' OF THE HOUSE. LEGEND: BUILDING DEPARTMENT 0
CITY OF EDMONDS I=
-rhlc serve)f_ LA-rer-At- OF
WATER & SEWER w PROPOSED WATER PIPE w
TATER CONSTRUCTION NOTES:
INSPECTHM REO'D. _ss— PROPOSED SEWER PIPE co
1" METER TO BE INSTALLED —G— PROPOSED GAS LINE
CALL 425-771 -11)2201EXT. 1326, 0 20
WATER SERVICE LINE TO BE 11" MINIMUM DIA. - - - - - - - PROPOSED PERF. PIPE
1 "=20' 1!!&i2T6iil Od 2 Wbi kkg Days A You Dig
PROPOSED UNPERF. PIPE
A TRACER WIRE MUST BE PROVIDED WITH THE SERVICE LINE IF PIPING IS NON-FERROUS. Scale 1-800-424-55W C1.0
n' umm un*rwouw Lmeftn owft
z
7i
(IL
R:\Proiects\322 (John Wiskerchen Residence)\001-13\Dwq\sheets\MP\WR—drOl.dwq 1107
I
Top 10.0'
�EX. JL'�' CITY O� EDN�ONIDS THE NW 1/4 OF SECTION 24, TOWNSHIP 27
__UXIT\� EA5EMENT,PER PLAT/
"'__4A.F.N S106095063) / " —_
EX. 15' INGRESS,
r rD F C C �P, i � T1 I I T',/
X
Ogg
BOT 11.0'/
r
................
7
_j
TOP 114.0
17
50T 11/2. 0'
F ROC"X_
CON'STRUCT16N
ENITRANCE
om
Ij
57A� U'Aafll'
C14
00
T6P 114, 10 12 419 8 t'F
:0) 1
_BqT 112!0 Q.,
FINIShl) FL06R EL. 118.175'
LOWER
MAIN FINISHED FLOOR 128'
GARAGE F6OOR EL. J27.83'
TIBI F
C_'7
C3, L
N
cli
— — — — — — — — — --
w
j
IMPERVIOUS SURFACE CALCULATIONS
KIM QH11 n1k1r_1 W)OP 0"T1 IKIP hKirl Hnimr, rA n0b AAqQ qr
EASEMENT
(A.F.N P-404260226)
CONCRE-IR-9
DRIVE
TOP 132.0'
BOT 130.0'
TOP _1 32.0'
EIOT 130-.0'
IV- \N_ ",,I-
W-W
4ORTH, RANGE 09 EAST, W.M.
PARCEL NUMBER
00756500001000
>
<
m
Z
M
FTI
51)
NEW COVERED PORCH: (INCLUDED IN NUMBER ABOVE)
LEGEND:
NEW DRIVEWAY:
1581 SF
- - - - -
CLEARING & GRADING LIMITS
NEW PATIOS ON GRADE (OUTSIDE OF AREAS ABOVE):
241 SF
SILT FENCE (SEE CITY OF EDMONDS DETAIL E1.11, sheet C3.11)
NEW DECKS (OUTSIDE OF AREAS ABOVE): PuWwms
178 SF
TOTAL IMPERVIOUS SURFACES: Cotjsmg��
505 SF 52S I SIP
El
CATCH BASIN INSERT (FILTER SOCKS WILL BE PROVIDED AS NEEDED DOWNSTREAM)
OFF 51—to— imeepvto'hs
LOT COVERAGE CALCULATION
30q sr —
-------
10' CONTOUR (EXISTING)
_767A-L.
TOTAL SITE AREA: 12,198 SF
- - - xyx ---
2' CONTOUR (EXISTING)
AREA OF STRUCTURE: 3878 SF
_XXX
10' PROPOSED CONTOUR
TOTAL COVERAGE BY STRUCTURE: 32%
2' PROPOSED CONTOUR
INFILTRATION CALCULATION
TOTAL IMPERVIOUS SURFACES: .13 ACRES
NATIVE SOIL DESIGN INFILTRATION RATE: 4- / HOUR
SITE STORMWATER INFILTRATED = 100%
-------------------------------------------- 1 "=20'
BMP INFILTRATION TRENCH SIZE: 511 X 45W X 451)
BMP INFILTRATION DRYWELL SIZE: 2' DIAMETER
N
20
Scale
GENERAL NOTES
LOT AREA
12,198 SF
LOT SLOPE
21 % (AVG.) z
0
1 . MARK CLEARING LIMITS - PRIOR TO DISTURBANCE MARK SETBACKS AND BUFFERS
PER SITE PLAN, CLEARING LIMITS ARE TO BE CONFINED TO THE APPROXIMATE
AREA OF THE EXISTING RESIDENCE AND ADJACENT AREA PER SITE PLAN.
2. ESTABLISH CONSTRUCTION ACCESS - EXISTING CONCRETE DRIVE AT INGRESS
EASEMENT TO BE USED AS CONSTRUCTION ACCESS - MAINTAIN AS NEEDED TO
PREVENT EROSION.
3. CONTROL FLOW RATES - SEE NOTES ON SEDIMENT CONTROLS (#4).
4. INSTALL SEDIMENT CONTROLS - SEE NOTES, SITE PLAN, AND DETAIL 2/A1.1 FOR
METHOD AND LOCATION.
5. STABILIZE SOILS - SEE SITE PLAN FOR MATERIAL STOCK PILE NOTES. NO
UNWORKED OR EXPOSED STOCKPILE TO REMAIN FOR MORE THAN SEVEN DAYS
DURING MAY 1 THROUGH SEPT. 30; OR 2 DAYS BETWEEN THE DATES OF OCT. 1
THROUGH APRIL 30. BACKFILL FOUNDATION WALLS AS SOON AS POSSIBLE AND
REMOVE SURPLUS SOIL.
6. PROTECT SLOPES - COVER EXPOSED DISTURBED SLOPES UNTIL VEGETATION IS
RE-ESTABLISHED.
7. PROTECT DRAIN INLETS - N/A
8. STABILIZE CHANNELS AND OUTLETS - N/A
9. CONTROL POLLUTANTS- ALL CHEMICALS AND POLLUTANTS TO BE PROPERLY
STORED AND SHALL NOT BE ALLOWED TO MIX WITH STORM WATER.
10. CONTROL DEWATERING - PROVIDE APPROXIMATELY 6" POSITIVE DRAINAGE FROM
SILT FENCE BACK TOWARD PROPERTY TO ALLOW POOLING AND INFILTRATION
PRIOR TO RUN OFF ONTO NEIGHBORING PROPERTY. INSTALL PERMANENT
INFILTRATION SYSTEM AS SOON AS POSSIBLE.
11. MAINTAIN BMPS
12. MANAGE THE PROJECT
CONSTRUCTION NOTES:
0 ELEVATIONS SHOWN ON THIS PLAN ARE NOT
AS -BUILT. FIELD VERIFICATION OF DESIGN IS REQUIRED.
THE ROCKERY IS NOT TO EXCEED A HEIGHT OF 3'0".
THE ROCKERY IS NOT TO IMPEDE THE PURPOSE OF
THE EASEMENTS.
OWNER/CONTRACTOR IS RESPONSIBLE
FOR EROSIONCONTROL AND DRAIN.A'GE
ALL EXPOSED SURFACES TO RESUB"
BE COVERED MTi HIN 2 DAYS SEP 16 2013
BUILDING DEPARTMENT
cITY OF EDMONDS
CERTIFIED EROSION CONTROL SPECIALIST
SITE DEVELOPMENT ASSOCIATES
BILL HELSLEY
1724 W. MARINE VIEW DRIVE #140
EVERETT, WA. 98201
(425) 486-6533 ex. 101
bhelsley@sdaengineers.com
G
v E
0
0
Cn
0
WS
u
60
u 2 k:
0
z
z
w
U
Z
W
w
w
Z 1-
3:
0
Z11
W"
u
Lu
0
z
Lu
z
Lu
cc
0
z
a
w
z
3r-
<
L)
d
ac
w
C6
�e
LLi
Cl)
3::
CM 2 Wa n Dftv A, 1, , You Cft I
1-800-424-2M C2.0
umn unftrward L=
ODWXD�MWQ
Wiskerchen
.d.q 1107
THE NW 114 OF SECTION 24, TOWNSHIP 27 NORTH, RANGE 09 EAST, W.M.
NON -WOVEN -
FILTER FABRIC
(TYP.)
BOTTOM/TRENCH 6- MIN. -
INTO CLEAN SANDY SOILS
FILTER FABRIC FILTER FABRIC MATERIAL IN
SECURED TO 2" X 2" CONTINOUS ROLLS, USE STAPLES
14 GA. WIRE FABRIC OR WIRE RINGS TO ATTACH
EQUAL FABRIC TO WIRE.
2" X 2" WOOD OR C:) M
EQUIVALENT cu �D -IVWOIRE MESH SUPPORT FENCE
T SUPPORT FILTER FABRICJ
CU
�u IE1 115115
OD
1=4
I I IE1 I I
Ia I I
ZD—
�ju
DI; mr
=151 161fti
— — — — -
TI—CIURY BOTTOM OF FILTER
MATERIAL 8' TO 12'
81
PLACE 3/4--1.5" WASHED GRAVEL IN
THE TRENCH AND ON BOTH SIDES OF
FILTER FABRIC FENCE ON THE SURFACE.
6' MAX.
Li
2' X 2' WOOD POSTS OR EQUIVALENT
CITY
EROSION
OTHER
INSPECTION REQUIRED ON ALL
CONTROL METHODS BEFORE
WORK CAN BEGIN.
CON RACTOR/DEVELOPER SHALL MAINTAIN
AND REPLACE STRAW BALES TO INSURE
PROPER EROSION CONTROL.
CITY OF
EDMONDS
REVISIONS
STANDARD DETAIL
APPROVED BY
DATE
ALTER FABRIC FENCE FILTRATION SYSTEMS
789
DATE 7/24/01
SCALE NTS
DWG NO. E1.1
> 5' F CLEAN IT' > 5'
ON
SOI�SFILL
(1 O-± MIN)_ --711
MIN T
VARIEs T I \_6"0 UNPERF. Ll
PVC TIGHTLINE
6" PERE
PVC PIPE
CLEAN -Y4- - 1)�- WASHED
EQ. GRAVEL OR CRUSHED ROCK
Uj
V)
z
SEDIMENT CONTROL/
OIL -WATER SEPARATOR
CATCH BASIN (REQ'D FOR
DRIVEWAY RUNOFF ONLY)
-V' 66simv"atCl wr-LL -ro rse nusrhuon
4.5' M I N.
INFILTRATION TRENCH DETAIL
NOT TO SCALE
R Out D ownSPOU1
House
CatchBa3in
01ird Drain)
ed flow
Dwnspout
0
24 Imh (As meter
DRY WELL
H?le Fd1ecI
PLAN VIEW
02- TWashed
Dr&inRo-ck
TS
N NT
R ool Downspott
MarkCanterofHole,
wilh I, Capped PVC
House Overflow
or Otm
SplashBlock
Topsail
RushwithSurlace
flow
Fine Mesh Semen
Min. 4cla.
PVC Pipe
CatchBasin
(Yard Dra"
2! 1 h Diameter 4�trh-
Skies of Hole
ole Filledvilh
0/2-TWashed
Unedwith
Fifter Fabric
DrainRock
Le
19ffdfl.—
I
- -
Mr. 11 above Seasonal
DRY WELL
H igh Groundwaiet Table
SECTION
NTS
Figure 3.4 — Typical Downspout Infiltration Drywall
Source: King County
DEPARTMENT OF ECOLOGY
February 2005 Volume I// — Hydrologic Analysis and Flow Control BMPs
NON -WOVEN -
FILTER FABRIC
(TYP.)
3-9
6" PVC PERF. PIPE
@ 0.5% SLOPE MIN.
-CLEAN Y4" 1X" WASHED
GRAVEL OR CRUSHED ROCK-hesuB
2013
BUILDING DEPAFOUEN"
PATIO DRAIN GRAVEL TRENCH CITy Of EDMONDS
NOT TO SCALE
co
z
0
!2
3 5. 21-
2 z
N E
0
E
0
C
Z
.0 c
A
t --
5;
A
M
0 g
z
Z
W
z
0
z
W :s
z
W
0
W
cc
z
ca
z
Uj
CO)
-j
W
W
�e
a
CO)
3::
do
Wiskerchen
-dt01 cl�g
2vmn DWAM, 'You
C3.1
GENERAL NOTES:
THE NW 1/4 OF SECTION 24, TOWNSHIP 27 NORTH, RANGE 09 EAST, W.M.
1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO
THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING
SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL
MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS:
- CURRENT INTERNATIONAL BUILDING CODE (IBC)
- 2012 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE
AND MUNICIPAL CONSTRUCTION
- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER
MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT
EDITION)
2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS
REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED
OTHERWISE
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER
OF RECORD AND THE LOCAL GOVERNING AUTHORITY.
5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE
PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL
AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR
SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND
ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO
THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING
OCCUPANCY/FINAL PROJECT APPROVAL.
6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK
INFORMATION.
14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON
MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED
STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF
ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND
REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL
REPORT.
15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED
OR EXISTING SITE FEATURES.
16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS.
FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN
LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE
INDICATED ON THE PLANS.
17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN
OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS
OTHERWISE APPROVED BY THE ENGINEER.
18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS
AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM
DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE.
19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC.
SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE
STORMWATER DETENTION SYSTEM.
20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR
INSTALLATION OF ALL SITE IMPROVEMENTS 1INDICATED ON THESE
DRAWINGS.
21
7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN
HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR
OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE
CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS
THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY
VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO
FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN
HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS 22
PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND
CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING
POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO
RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING
UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. 23
ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE.
8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING
CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES
LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO
CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE
PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S
REPRESENTATIVE OF ANY DISCREPANCIES.
A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY
PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION
ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A
COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED
TO 425-744-6057 OR EMAILED TO LINDA!MCMURPHY@EDMONDSWA.GOV.
BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY
THEREAFTER.
AS A MINIMUM REQUIREMENT, ALL DISTUNBLU AKLA�� ON AND OFF SITE
SHALL BE RETURNED TO THE EQUIVALENT !OF THEIR PRECONSTRUCTION
CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND
STANDARDS.
ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY
OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE
EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION
CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL
REQUIREMENTS.
24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES
BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED
WITHOUT PRIOR APPROVAL.
25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH
EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED.
10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE
TO FIELD CONDITIONS. 26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED
CONTOURS OR SPOT ELEVATIONS SHOWN.
11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT
(WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH 27
THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN
STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT.
28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND
MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT
WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND
OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS
AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR
SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND
BRACING, AS REQUIRED.
12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE
RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT.
13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR
PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND
PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY
EQUIPMENT, STOCKPILING).
FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT
MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET.
29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW
CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT
z
SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. 0
CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS
WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL.
30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY
RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED
OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO
EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN
APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES.
31. ALL UTILITIES SHALL BE PLACED UNDERGROUND.
32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO
CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE
AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S
REPRESENTATIVE PRIOR TO BACKFILLING.
33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE
NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM
DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S
REPRESENTATIVE AND CITY.
34. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY
RIGHT-OF-WAY SHALL BE COMPACTED TO 95%. COMPACTION TEST
REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING.
35. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR
LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN
THE UTILITIES.
36. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION
OF SITE UTILITIES WITHIN THE BUILDING.
37. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR
ELECTRICAL WORK.
38. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION
SYSTEM.
39. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY
ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION.
61:1-1 16 2013
BUILDING DEPARTMENT
CITY OF EDMONDS
2 S
:2
E
0
0 c 0
E -0 .2
3:
C t5
c
u L
Ix
0-.
z
z
w
m
0 z %
,
m
w
0.
E
z
z
U)
Lu
I=
z
ca
z
LLJ
CID
3r-
U
Lu
cl)
3::
Cd 2 Wo ki OW
1-800-42,r-50 C3.2
UM= Um*rWouW Umolm Car&w
WWrAWAWA)
Wiskerchen
City of Edmonds
Critical Area Notice of Decision
Applicant:
Property Ow ner:
Critical Area File #:
CRA-a4v . t 9 Q 5-0 0 k4 L(
Permit Number:
-Z 0 13 *0 S-
Site'Location:
Parcel Number:
0 -7 S-6 000 0 (6to
Project Descriptio n:
F/2-
Conditional Waiver. No critical area report is required for the project described above.
I There will be no alteration of a -Critical Area or its required buffer.
2. The,proposal. is an �Ilowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or
23.80.040.
3. The proposal is exempt pursuant to ECDC 23.40.230.
�LErosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and
sediment control plan in compliance with ECDC 18.30.
r-I Critical Area Report Require d. The proposed project is within a critical area and/or a critical area
buffer and a critical area report is required. A critical area report has been submitted and evaluated
for compliance with the.following criteria pursuant to ECDC 23.40.160:
I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40-.120,
Mitigation sequencing;
2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare
on or off the development proposal site;
3. The pro posal is consistent with the general purposes of this title and the public interest;
4. Any alterations permitted.to the critical area are mitigated in accordance with ECDC
23.40. 110, Mitigation requirements.
5. The pr ' oposal protects the critical area functions and values consistent with the best
available science and results in no net loss of critical functions and values; and
6. The proposal is consistent with other applicable regulations and standards.
Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequately
mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and
the provisions of the City of Edmonds critical area regulations. See attached findings of
noncompliance.
;3--F'avorable Critical Area Decision. The proposed project as described above and as shown on the
attached site plan meets or is exempt from the criteria in' ECDC 23.40.160, Review Criteria, and.
complies with the applicable provisions of the City of Edmonds critical area regulations. Any
subsequent changes to the proposal shall void this decision pending re -review of the proposal.
F� Conditions. Critical Area specific condition(s) have been applied to the permit number referenced
above. See referenced pen,nit number for specific condition(s).
mlka�fv'v-
Reviewer
Aw'�' / a W- t - -
Signature P
-7
Date
Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the
requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any,
for the permit or approval involved.
Revised 12/16/2010
PLANNING DATA
SINGLE FAMILY RESIDENTIAL
I=STREET
Name: 0S TP, cd-�57�1�0000(000�
Date:
2
4 5x�
Site Address: N
Plan Check#:
Project Description: ST--12 (/CA--c
Reduced Site Plan Provided: (YES NO)
Zoning:
Map Page:
Corner Lot: (YES Flag Lbt: OES NO)
Critical Areas Determination 9: V- no
M-Study Required
Waiver
SEPKrmination:
empt
El Needed (for over 500 cubic yards of grading)
0 Fee 0 Checklist 0 APO List with notarized form
fix Required cks
S
Side-
Side: ID
R
�o
Actual Setbacks
Side: LA
Side:
1q. 97
Detached Struct s.
Y�� w-
Rockeries: I A,49-4; �- K� -r-6 C rp_c-v— if a S
' Aow—ltz- . I
El FencesfTrellises-
El Bay Windows/Projecting Modulation:
O�Stairs/'Deck: we-s*
HeIght
Datum Point:,MV/70,14�,�, 410A,(
Datum Elevation:
Maximum Height Allowed:
Actual Height: -7-co, 6:7 Q 9q, 3-37.
Other
Parking Required:
Parking Provided: -Z- eUC I
Lot Area:
Maximum Lot Coverage: 35% Proposed:
Lot Coverage Calculations: 6U!T &ks, do fck — 2) 9 -7
ADU Created: (YES
e90
Subdivision: X /0
Legal Nonconforming Land Use Determination Issued: (YES
r- Ir- cil comments
J^
A-- /M � , ( . )5
G- m7-vr q �s eVU9 Z k,,i
C 131. 7-5'
P . Ian Review I By: ZA41-�U-7 LV �/ 3
Planrtirq Data Form 04-11-06,doc
4
LIU & ASSOCIATES, INC.
Geotechnical Engineetirg Engineefing GeoNy
September 16, 2013
Mr. John Wiskerchen
16531 Broadway Avenue
Snohomish, WA 98296
Dear Mr. Wiskerchen:
Subj ect: Geotechnical Review of Tnfiltration Trench Design
Wiskercheri�frost Residence
645 - 9h Avenue North
Edmonds, Washington
L&A Job No. 12-069
Earth Sciertoe
We have completed a geotechnical review of infiltration facility design, shown on
Drawing CLO prepared by Site Development Associates for the subject residence. The
infiltration facilities for onsite stomiwater disposal include,an L-shaped infiltration trench
(4.5- foot -wide by 5 1 -foot-lo.ng) near the southeast comer of the site and a* 2-foot-diameter
dry�vell (serving a 221 square foot patio) near the southwest comer of the site. It is our
opinion that the infiltration facilities as designed are in compliance with our
reconunendations.
Please(feel free t(
�stion,s.
Yours very'truly,
qL1 ASSO TES, INC.
Jui
J. S. Julian) Liu, Ph.D., P.E.
Consulting Geotecl-inical Engineer
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (426) 486-2746
I., 6—MM19
t7 "I
fii�
LIU & ASSOCIATES, INC.
Geotechnic6l Engineering
Mr. John Wisker'chen
16531 Broadway Avenue
Snohomish., WA 98296
Dear Mr. Wiskerchen:
FA91ftezong C-e-010-g-y-
July 15, 2013
Subject: Geotechnical Review of Design Plans
Wiskerchen/Trost Residence
645 — 9'1' Avenue North
Edmonds, Washington
L&A Job No.'I 2-069,
Earth Science
We have completed a geotechnical review of the design plans for the subject residence. It
is our opinion that the design plans p*repared by Craft, LLC, are generally in compliance
with the recommendations in our 7/15/201'2 geotechnical report. Ourcomments are as
follows:
1. The 154bot long infiltration trench off the northNvest comer of the house is too
close to and may jeopardize the stability of the adjacent rockery walls. This
infiltration trench should be re -located to the south side of the house off the south Lai
corner of the garage, if possible. By doing so. the infiltration trenches will all be W.J
as far away frorn. the steeper western area and the rockery walls. LA..
2. For the typical section of the infiltration trenches shown on Sheet Al. 1. the word ta
"Non -Woven" should added to the fther fabric lining the trench walls. The
washed gravel to be used to back -fill the trenches should be clean 3/4 to I - V2 inch
washed gravel. CO*
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (425) 483-9134 - Fax (425) 486-2746 RESUB
JUL 17 2013
BUILDING DEPARTMENT
CITY OF EDMONDS
Ju.1y 15, 2013
GeotectihiealReview — Wiskerichen[FrostResidnce
L&A. Job No. 12,069
Page 2
3. A not� should be -added to the GENERAL STRuen-RAL NOITS to,sAy
"Foundation: :c6n�truction �hould comp*ly Mth the, rccomme'ndations in ih�
7/15/2.012 geolechnical report by Liu & Associates, Inc. Footing foundati , ons
should.be constructed or dense sajid soil. Allowable soil bearing. pressure should
not exceed 25WOS'C"
Please feel free to, coftta�ct`us if you have questions,
Yours ver)(truly,
U SSOCI�X�si INC.
J. IS.((Ju "-an� Liu. PhD, P.E.
Consulting Geotechnical Engineer
LIU & ASSOCIATES, INC.
LIU & ASSOCIATES, INC.
Geotechnical Enginmring Engineering Geology Earth Science
July 15j 2012
Mr. John'Wiskerchen
16fS31 Broadway Avenue
Sn6hornish, WA 98296
Dear Mr. Wis.kerchen:
Subj ect: Preliminary Geotedhnical Investigation
Single-Fami ly Residence Building Lot
645 - 9" Avenue North
F.drnonds, Washington
L&A Job No. 12-069
INTRODUCTION
We have completed a preliminary geotct,;hnical investigation for the, subjcct single-family
building lot, located at the above address in Edrnonds, Washington. The general. location
of the lot is shown on Plate I - Vi�inity Map. We understand that you plan to develop a
single-family residence on this lot, although neither a topographic survey plan nor the
architcctural design plans of the residence is avail.able at the'time- this report w as
prepared.
The purpose of this preliminary investigation is to. explore 'subsurface conditions of the lot
and evaluate site stability, feasibility of onsite. stormwater disposal and building
-foundation support for the proposed development. Five test pits have been excavated on
the lot to explore I its subsurface conditionsfiar. this investigation. Presented in this report
are our preliminary findings of subsurface conditions of the lot and our prelirninarY
geotechnical conclusions.
'Elf,
19213 Kenlake Place NE Kenmore, Washington 98028
Phone (42�) 483-9134 Fax (426) 486-2746 _1 - .13
JUH 3 2C
DEVL-Lu
rh� OF EDMONDS
6THEET FILE
July .15. 2012
Mr. John Wiskercne.,
L&A Job -No. 1 M.69
Page 2
SCOPE OF SERVICES
To achieve the above purpose of this preliminary investigation, our scope of servites
comprises specifically the following:
I Review the geologic and soil conditions at the lot based on a published geologic
man.
2. Explore the subs6rface conditions of the lot with backhoe test pits.
3. Perform preliminary geotechnical engineering analysis for site stability evaluation,
onsite stormwater disposal feasibility and foundation support capability.
4. Prepare a written report to present our preliminary findings and conclusions.
SITE CONDITIONS
Surface Conditi
on
The subject lot is situated on or near, the too of a moderately steco. to steep, westerly -
declining hillside. The int 6riorof the lot descends gently to moderately steeply to the
. west, bordered by a moderately steep to steep slope along its west and part of the north
sides. The lot is currently vacant and undeveloped. It is covered by over -grown grass and
brush, with isolated trees dotting its south mid west perimeters.
Geologic Setting
The Geologic Map of the Edmonds East and Part of the Edmonds West QuadranOcs,
Washinkton by Jame's P. Mirbird, publis:hed by U. S. Geological' Survey in 1983, was
referenced for the geolo 4 gic and soil conditions at the residence site. According to this
publication, the. surficial soil units at and in the vicinity of the subject lot are mapped as
LIU & ASSOCIATES, INC.
July 15, 2012
Mr. John Wi!�Kercner
L&A Job No. 12-06.9
Page 3
u am
an Advance Oumash (Qva) soil unit' 11dCri" byaTransitionaI.Beds(Qtb) soil unit, with'
the transitional beds soil unit exposed on the hillside below the subject property.
The deposits of the advance,out-,vash soil unit are co rposed of stratified sand and a -trace
to some gravel, with very minor amount of silt and clay, deposited by the meltwater of
advancing glacial ice durin*g the last glaciation. Duc -to their generally granular.
composition, the advance outwash deposits are of 'moderately high permeability and,
dr-dins fairly well. The advance outwas h deposits had been glacially overridden and are
generally dense to very dense in their natural, undisturbed state, except the soil exposed in
the top 2 to 3 feet which is normally w6tihered to a loose to medium -dense state. The
advance outwash deposits can stand.r' Steep Cuts
in or natural slop4�s for extended Period
when undisturbed. Where exposed on slopes with poor vegetation cover and subjected to
storm runoff or groundwater seepage, the surficial advance outwash soil can be gradually
eroded and may s lough and redeposit to a flatter incaAtion. The underlying fresh
advance outixash -deposits in their native, undisturbed state can provide good foundation.
support with little settlement expected for light to moderately heavy structures. -
The transitional beds soil unit is composed of glacial and non. -glacial- deposits consisting
mostly of.massive, thick or thin beds and laminae of gray to dirk -gray, fine-sanidy to
clayey silt. The fine-grained transitional beds soils were deposited -in lakes at some
-distance away from the ice front and in fluvial, systems prior to the advance of the glacial
ice. The sediments were mostly deposited during the transitional peTiod near the close of
pre -Fraser interglacial (Olympia Interglaciation) time. and into early Fraser glacial time.
LIU & ASSOCIATES, INC.
July 15,2012
Mr. John Wisk.ercner.
L&A Job No. 12-069
Page 4
The transitional beds depos its generally are. very stiff to hard in its natural. undisturbed
state. Where exposed the upper few inches to few feet of soil,may be weathered to a soft
to medium stiff state. The transitional beds deposits have extremely low permeability and
tend to perch stormwater infiltrating into the overlying more -permeable soil layers.
Groundwater may emerge out of slopes and cuts where the tfansitionAl beds soil unit is
exposed or near the surface. When the seepage pressure is high in the*wet winter months,
the emerging groundwater may erodethe overlying soils and cause the soils above the
seepage zone to slough off.
Soil Condition
Subsurl"ace conditions of the subject lot were explored with five test pits; These test pits
were excavated on July 12, 2012, with a rubber -track backhoe to depths of 6.0 to 8.0 feet.
'Me approximate locations of the -test pits are shown on Plate 2 - Site and Exploration
Location Plan. Their locations had not been surveyed and should be consider as
approximate -for reference only.
A geotcchnical engineer from our office was present during subsurface exploradon,who
examined the soil and geologic conditions encountered -and completed logs of test pits.
Soil samples obtained from each soil layer in the test pits were visually classified in
general accordance with United Soil Classification gy'stern, a copy of which is presented
on Plate 3. Detailed descriptions of soils encountered during site. exploration are
presented in test pit logs on Plates 4 through 6
LIU & ASSOCIATESt INC.
July 15,2012
Mr. John Wiskercheu
L&A Job No. 12-069
Page 5
Sporadic Those fill 'was encountered by the tesi pits, - The fill up, to abdut 2.9 feet thick� is
often with common br ick, paving brick and timber boards intermixed in organic topsoil.
Underlying the MIA 6 1 is a layer o flight -brown to brown, me . dibm-
9 opsoi f weathered soil o i
dense� slightly silty� fine sand, about 1.5 to �.9 feet thick� This weathered soil is
underlain'to the depths explored by a fte'sh advance o4twash deposit of light -brown to
light -gray to brown -gray, dense, fine to mediwn sand which appeaTsto be of an advance
outwash soil unit.
Groundwater Condition
Groundwater was not encountered by any of the fiv'e test pitsexcavated on the site. The
fill, topsoil, weathered soil and fresh advance outwash soil underlying the site are of
moderately high permeability and would allow stormwater to seep through easily.
Stormwater infiltrating into the ground %%ould perch. on the transitional beds soil unit
underlying the advance out:wash soil unit. 'Me amount of and the depth to this near -
surface, perched 2roundw I ater would fluctuate seasonally, depending Oil precipitation,
surface runotT, ground vegetation cover, site utilization, and -other factors.
PRELIMINARY CONCLUSION
Site Stability
The lot is underlain at shallow depth by dense advance outwash deposits ofhigh shear
strength and of high resistance against slope failure. Therefore, the lot should be quite
stable. The advance outwash soil unit is underlain by transit ional beds deposits of.veky-
stiff to hard, fine sandy to clayey sift. Where the contact..of these two soil units is exposed
LW & ASSOCIATES., INC.
July 15,2012
Mr. John W iskerchen
L&A Job No. 12-069
P, A
age ..
I
on slopes, groundwater seepage would emerge out of the slopes. In the wet winter
months, groundwater would rise'and the seepage pressure would increase. The increase
seepage under higher pressure could erode the sandy soil above the seepage zone and
d slides. especially where, the slope is devoid of vegetation cover in
could cause erosion an
and around.the seepage zone. The contact of the advance outwash and the transitional
beds soil units -is likely exposed on the hillside below and beyond the subject lot. This
would lessen the erosion and slide hazards of the lot due to groundwater scdpage, but
would not totally diminis . h the possibility of slides propagating uphill over long term.
This is the risk of the lot that needs to be recognized. Protection and maintenance of
vegetation cover on the slope on and below the lot is critical of maintaining stability of
the slope below the subject lot.
Onsite Stormwater Disposal
Stormwater over impervious surfices, such as roof and paved driveway should be
collected and drained into an existing storm sewer if at all possible. 17he subject lot is
underlain at shallow depth by advance outwash soil of moderately high permeability. If it
is not possible to discharge collected stormwater into an existing storm sewer, onsite
disposal of'sLormwater into infiltration trenches may be considered. 'Ibemoderately high
pemeability of the advance outwash sand soil should be able to support infiltration
trenches.
LIU & ASSOUATES, INC.
July 15,2012
Mr, John Wiskerchen
L&A Job NO. 12-069
Page 7
Building Foundations
Conventional footing foundations, may be used to support the proposed -residence. The
footing foundations should be constructed on or into the' undisturbed, dense, fresh,
advance outwash soil. To reach this soil stratum, the footing trenches should excavated to
about 4 to 5 feet'deep. For design of footing foundafions of the residence, including dead
and live loads, an allowable.soil bearing pressure nbt to exceed 2,500 psf may be used. A
one-third increase in this allovmble soil bearing pressure may be used. When considering
short-terak, transitory, wind or seismic loads.
LIMITATIONS
This investigation is preliminary in nature. A more site and project specific geotechnical
cnainecring study should be conducted once. the topographic survey of the lot and design
plans of the proposed residence are available. This preliminary report has been prepared
for the specific application to the subject lot for the exclusive use by Mr, and Mrs.
Wiskcrchen and their represent4ives, consultants and contractors. The conclusions and
interpretations in this report. however, should not be construed as a warranty of the
subsurface conditions. The scope of this invtstigation does'not include services related to
construction safety precautions and our recommendations are not intended to direct the
contractor's methods, - techniques, sequences or procedures, except as specifically
desceibed in this report for design considerations.
The rmdings and conclusions in this report are based on the geologic and soil conditions
encountered in, the test pits excavated on the lot, and our experience and engineering
L11U & ASSOCIATES, INC.
July 15, 2012
Mr. John Wiskerchen
L&A Job No.. 12-069
Page 8
judgmcrit. They are professional opinions derived in a manner consistent with -the level of
care and ski-11 ordinarily exemised by.other members of the profession currently practicing
under similar conditions in this area for. a prelimi nary - geotechnical investigation. No
warranty, expressed or implied, is made.
The actual subsurface conditions of the site may vary from those encountered by the test
pits. The nature and extent of such variations may'not become evident until. construction
gtart�, Modifications of geotechnical recommendations may be required then;
CLOSURE
We are pleased to be of service to you on this project. Please feel free to contact us if you
I
have any questions regarding ihis report or need further consultation.
Six plates attached
Yours very truly,
.L1 ASSOCI. -SANC.
S
J. S. (Juliap) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
LIU & ASSOCIATES, INC.
WOT To
LIU & ASSOCIATES, INC.
GeotechnicW Enimering - Engineering Geology - Earth Science
0
prl
0
I
SITE AND EXPLORATION LOCATION PLAN
WISKERCHEN PROPERTY
645 - 9TH AVENUE NORTH
EDMONDS, WASHINGTON
IOB NO. 12-069 DATE.!/12/2012 I PLATE
L
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS
GROUP
GROUP NAME
SYMBOL
GRAVEL
CLEAN
GW
WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL
COARSE-
MORE T14AN 50% OF
GRAVEL
GP
POORLY -GRADED GRAVEL
GRAVEL WITH
GM
SILTY GRAVEL
GRAINED
COARSE FRACTION
SOILS
RETAINED ON NO. 4 SIEVE
FINES
GC
CLAYEY GRAVEL
SAND
CLEAN
SW
WELL -GRADED SAND, FINE TO COARSE SAND
SP
POORLY -GRADED SAND
MORETHAN 50%
MORE THAN 50% OF
SAND
SAND WITH
SM
SILTYSAND
RETAINED Ok THE
COARSF FRACTION
NO. 200 SIEVE
PASSING NO- 4 SIEVE
FINES
SC
CLAYEY SAND
FINE-
SILT AND CLAY
INORGANIC
ML
SILT
CL
CLAY
GRAINED
LIQUID LIMIT
ORGANIC
OL
ORGANIC SILT, ORGANIC Wy
SOILS
LESS THAN 50%
MORE THAN 50%
SILTY AND CLAY
INORGANIC
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
CH
CLAY OF HIGH PLASTICITY, FAT CLAY
PASSING ON THE
LIQUID LIMIT
ORGANIC
OH
ORGANIC SILT, ORGANIC SILT
NO. 200 SIEVE
50% OR MORE
HIGHLY ORGANIC SOILS
PT
PEAT AND OTHER HIGHLY ORGANIC SOILS
NOTES:
SOIL MOISTURE MODIFIERS!
1. FIELD CLASSIFICATION IS BASED ON MUAL EXAMINATION
DRY -ABSENCE OF MOISTUAS, DUSTY. DRY TO
OF SOIL IN GENERAL ACCORDANCE WITH ASTIM D2488-83.
THE TOUCH
2. SOIL CLASSIFICATION USING LABORATORY TESTS IS BASED
SLIGHTLY MOIST - TRACE MOISTURE, NOT DUSTY
ON ASTM D2487-83.
MOIST - DAMP, BUT NO VISIBLE WATER
3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY ARE
VERY MOIST - VERY DAMP, MOISTURE FELT TO THE TOUCH
BASED ON INTERPRETATION OF SLOW -COUNT DATA, VISUAL WET - VISIBLE FREE WATER OR SATURATED,
APPEARANCE OF SOILS, ANWOR TEST DATA.
USUALLY SOIL IS OBTAINED FROM BELOW
WATER TABLE
LIU & ASSOCIATES� INC.
UNIFIED SOIL CLASSIFICATION SYSTEM
Gootechninal Engineering Engineering Geology Earth Science
PLATE 3
TEST PIT NO. 1
Logged By: JSL Date: 7112/2012 Ground EI;
Depth
uscs
CLASS,
Soil DescTip�on
Sample
No.
W
%
Other
Test
OL
Dirk -brown, loose, organic, silty fine SAND. with fine roots,
moist (TOPSOIL)
-------
2
SP/SM
----- -----------------------------
Brown, medium -dense, slightly sifty. fine SAND, trace gravel,'
slightly moist
3
4
-------------------------------------------
SP
Brown -gray, dense, fine to medium SAND, trace gravel, slightly
moist (ADVANCE OUTWASH)
6
7
Test pit terminated at 7.0 ft; groundwater not encountered.
.9
10
TEST PIT NO. -.2.
Logged By: JSL Date: 7/12/2012
Ground El. :t
Depth
ft.
USCS
CLASS.
Soil Descripbon, I
Sampte
No.
W
%
Other
Test
OL
Dark -brown. loose, organic, silty fine SAND, with fine mots,
moist (TOPSOILIT�ILL)
2
SIP
----------------------------------
Brown to light -gray layered, find SAND, trace gravel, slightly moist
(FILL)
3
- —
— — — —
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -
OL
Dark -brown, loose, organic, silty fine SAND, with fine roots.
4
) -------------
Light-brown, medium -dense, fine to medium SAND, trace gravel,
j �Hqh�y_gLoijt — — — — — — — — — — — — — — — — — — --- — — — — — —
SIR
Ught-brown to light -gray, dense, fine to medium SAND, trace
gravel, slightly moist (ADVANCE"OU-TWASH)
7
Test pit terminated at 8.0 ft; groundwater not encountered.
1D
LIU & ASSOCIATES, INC.
GeotechnicallEnginerering Engineering Geology -Earth Science
TEST PIT LOGS
WISKERCHEN PROPERTY
645 - 9TH AVENUE NORTH
EDMONDS, WASHINGTON
JOB NO. 12-069 1 oATE 7/12J20121 PLATE 4
TEST PIT NO, 3
Logged By: JSL Date: 7/12/2012 —
Ground Fl.
Depth
ft.
uses
CLASS.
Soil Descripbon
Sample
No.
W
%
Other
Test
OL'
Dark-browh and brown, loose, organic, silty fine SAND, with
I
common brick, paving brick and dimensional wood boards
mixed in, moist (TOPSOURLIL)
2
3
-------------------------------------------
SP/SM
Brown, medium -dense, slightly silty, fine SAND, trace gravel,
slightly moist
4
5
------------------------------------------
6
SP
Ught-brown to light -gray, dense, fine to medium SAND, tram to
some gravel.. slightly moist (ADVANCE OUTWASH)
7
8
9
Test pit terminated at T5 ft, groundwater not encountered.
10
TEST PIT NO, 4
Logged By: JSL Date: 711212012 —
Ground El.
Depth
USCS
CLASS.
Soil Description
Sample
No.
W
%
Olher
Test
OL
Dark -brown, loosel, organic, slighUy silty, fine SAND, with
occasional fragments of brick mixed in, moist (TOPSOILIFILL)
---------------------------------------------
2
SP/SM
Brown, aledium-dense, slightly silty, fine SAND, trace gravel,
slightly moist
3
4 —
--- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5
- -
- --- -
SP
- - - - - -
Light -brown to light -gray, dense, fine to medium SAND, trace to
some gravel, slightly moist (ADVANCE OUTWASH)
7
8
Test pit terminated at 8.5 ft: groundwater not encountered.
LIU &ASSOCIATES, INC.
Gectechnical Engineefing - Enginee6nq Geology - Earth Science
TEST PIT LOGS
WISKERCHEN PROPERTY
645 - 9TH AVENUE NORTH
EDMONDS, WASHINGTON
JOB NO, 12-069 1 DATE 71112/20121 PLATE 5
0
TEST PIT NO. 5
Logged By: JSL Date: 711212012
Ground �[_
Depth
f L
USCS
WSS.
$oil Description
Sample
No.
W
%
Other
Test
OL
Dark -brown, loose. organic, silty fine SAND, with firie, roots,
moist (TOPSOIL)
2
- —
— — — —
— — — — — — — — — — — -- ; -- — — — — — — — — — — - — — — — — — — — — — — -
SPISM
Brown, medlurn-dense, slightly silty, fine SAND. trace gravel,
3
slightly moist
4
- —
— — — —
— — — — — — — — — — — — — — — — — — — — — — — — — --- — — — — — — — — -
SP
Light -brown to light -gray, dense, fine to medium SAND, trace to
5
some gravel, slightly moist (ADVANCE OU7WASH)
6
7 7
Test pit terminated at 6.0 It: groundwater not encountered.
Logged By;
TEST PIT NO.
Date:
Ground El.
Depth
ft.,
USCS
CLASS.
Soil Descliption
Sample:
w
%
Other
Test
I
2
3
4
6
to]
LIU & ASSOCIATES, INC.
Geotechnical Engineeerin!j - G&Wogy. - Earth $denr.%
TEST PIT LOGS
WISKERCHEN PROPERTY
645 - 9TH AVENUE NORTH
EDMONDS, WASHINGTON
JOB NO� 12-0�.9 1 DATE Ill 2aO 121 PLATE
September 13, 2013
�'4/0 Prepared for
John Wiskerchen
645 9th Ave N
Edmonds, WA 98020
(425) 879-8889
Wiskerchen Residenc'e,,';.-"*`
Technical Information Report
Project Location:
645 9th Ave N RESU
Edmonds, WA 98020
SDA Project #322-001-13 BUILDING DEPARTMENT
CITY OF EDMONDS
Q1,
MEMO
A
", -Ua�
4 W.Urno"hos"
CRY
CIVIL ENGINEERING a PROJECT MANAGEMENT PLANNING
1724 W. Marine View Drive, Suite 140 Everett, WA 98201 0 425.486.6533 a www.sdaengineels.com
z'3TH"':"EET FILE
WISKERCHEN RESIDENCE
Technical Information Report (TIR)
Project Location:
645 9TH AVE N
Edmonds, WA 98020
Prepared For:
John Wiskerchen
6459 TH AVE N
Edmonds, WA 98020
(425) 879-8889
Prepared By:
Site Development Associates
1724 West Marine View Dr., Ste. 140
Everett, WA 98201
(425) 486-6533
Date:
September 13, 2013
Project Number:
322-001-13
Wiskerchen Residence
Technical Information Report
TABLE OF CONTENTS
SECTION 1 — EXECUTIVE SUMMARY
0 Project Overview
SECTION 2 — MINIMUM REQUIREMENT #11: PREPARATION OF STORMWATER SITE PLANS
• Step 1:
Collect and analyze information on Existing Conditions
• Step 2:
Prepare Preliminary Development Layout
• Step 3:
Perform Off -Site (Upstream and Downstream) Analysis
• Step 4:
Determine applicable Minimum Requirements
• Step 5:
Prepare a Permanent Stormwater Control Plan
• Step 6:
Prepare a stormwater Pollution Prevention Plan (SWPPP)
• Step 7:
Complete the Stormwater Site Plan
SECTION 3 — MINIMUM REQUIREMENT #2: CONSTRUCTION STORMWATER POLLUTION PREVENTION
PLAN (SWPPP) — OBJECTIVES AND APPLICABILITY
• Element 1:
Mark Clearing Limits
• Element 2:
Establish Construction Access
• Element 3:
Control Flow Rates
• Element 4:
Install Sediment controls
• Element 5:
Stabilize Soils
• Element 6:
Protect Slopes
• Element 7:
Protect Drain Inlets
• Element 8:
Stabilize Channels and Outlets
• Element 9:
Control Pollutants
• Element 10:
Control De -Watering
• Element 11:
Maintain BMPs
• Element 12:
Manage The Project
• Element 13:
Protect Low Impact Development BMPs
a Appendix 3-A — Construction SWPPP
SECTION 4 — MINIMUM REQUIREMENT #3: CONTROL SOURCE POLLUTION
0 Source Control Narrative, Strategies
SECTION 5 — MINIMUM REQUIREMENT #4: PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND
OUTFALLS
0 Natural Drainage Course Description
SECTION 6 — MINIMUM REQUIREMENT #5: ON -SITE STORMWATER MANAGEMENT
• Hydrological Description of Existing Drainage Patterns
• Hydrological Description of Developed Drainage Patterns
• Performance Standards
SECTION 7 — MINIMUM REQUIREMENT #6: RUNOFF TREATMENT
0 Discussion of Water Quality Treatment Design
Wiskerchen Residence
Technical Information Report
SECTION 8 — MINIMUM REQUIREMENT #7: FLOW CONTROL
• Existing Site Hydrology Synopsis
• Developed Site Hydrology Synopsis
• Flow Control Performance Standards
0 Appendix 8-A — WWHM3 Flow Control Design Calculations
SECTION 9 — MINIMUM REQUIREMENT #8: WETLAND PROTECTION
SECTION 10 — MINIMUM REQUIREMENT #9: OPERATION AND MAINTENANCE
SECTION 11 — MINIMUM REQUIREMENT #10: OFFSITE ANALYSIS AND MITIGATION
SECTION 12 — SPECIAL REPORTS AND STUDIES
0 Appendix 12-A — Geotechnical Report
Wiskerchen Residence
Technical Information Report
SECTION 1
EXECUTIVE SUMMARY
Wiskerchen Residence
Technical Information Report
PROJECT OVERVIEW
The proposed project is to construct a single family residence on approximately .28 acres located at 645
91h Ave North in the City of Edmonds. The project will clear and grade and eventually construct the single
family residence on the lot. The project is located in the NW % of section 24, Township 27 North, Range 9
East, W.M. More specifically, the project occupies parcel number 00756500001000. A vicinity map has
been included as Figure I of this document.
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash, cherry,
laurel and maple trees. The project site is surrounded by neighboring parcels on all sides, with houses
located on the parcels to the west, south, and east. The remaining parcel to the north is also
undeveloped. The site has a single drainage basin, which follows the natural topography of the area and
drains overland from east to west with an average lot slope of 21 %. Runoff can be expected to follow the
existing ground topography, and flow in a western direction, yet water is not expected to leave the site
due to soil characteristics with a high permeability for infiltration that allows for natural ground water
recharge.
Per NRCS Web Soil Survey, site soils consist of Alderwood Urban Land Complex. This material is an
unsorted mixture of loose to medium dense, reddish brown to tan silty sand with gravel and scattered
cobbles and boulders. Below depth ranging from approximately 2-4 feet, these sediments became dense
to very dense and grayish tan. The Alderwood Urban Land Complex consists of an unsorted mixture of
silt, sand and gravel that was deposited directly from basal, debris laden glacial ice during the Vashon
Stade of the Fraser Glaciation, approximately 12,500 to 15,000 years ago.
The Geotechnical Engineer for the project, Liu & Associates, INC, excavated test pits on site and
encountered Esperance sand deposits about 4 to 5 feet below existing grade. This deposit appears to be
of a high permeability and will be capable of supporting onsite stormwater infiltration. Per Liu &
Associates recommendation, a design infiltration rate of 4 inches per hour can be used for the design of
the infiltration trench.
Stormwater volumes will be mitigated onsite utilizing a 511 X 4.5'W X 45D infiltration trench and 2'
diameter dry well to infiltrate all of the onsite stormwater, thus the site's release rate will be at or below
pre-existing flow rates. The infiltration trench has been designed utilizing the latest version of WWHM3
continuous storm modeling software as per the 2005 DOE manual for existing versus proposed drainage
release rates.
Wiskerchen Residence
Technical Information Report
Aug 14, 2013 — 3:16PM Lost Saved By: TStanley
ro !e
ri
p
ca
14m-=
FRONT
ST
<
ram
RD
3RD AVE
S 0
0
z
(D
�2. 1
5TH E
S
ca
CDD
0
0.
CD (3
3
C,
)y L
2
0
13
ITH AVE S
9T ME
NJ
z
c
I
CO)
Ln
I
Z
40
m
L w
AVE 04 YA4pl
<
m
0
z
x
m
z
3:
QD
APLEWOOD
DR 0 0
-<
11
> C—
>
m
Cl)
0
Ln
0
88TH AVE w
0
0
m
z
C/) 0
z
0
0
m
0
AVE
w
(D
z
p
C2
r-
R:\Projects\322 (John Wiskerchen Residence)\001-13\Dwg\figures\TIR Figures\VicinityMap.dwg 8.5xll
r
N
SITE CHARACTERISTICS
U?
CO,
u
0
0
iT)
U,
p
(n
�2
C
0
C
(n
>
Ln
C
2
4)
CL (n
V) 3:
IN
C
0
�2 US
a Design
C14 Civil Engineering WISKERCHEN RESIDENCE r)
US Project Management NTS
DMWr1 Raw Planning ftwe
u
08/14/2013 1724 W. Mahe VKYw Ddye, Suite 140; Everett, WaLsington 98201 -S�
SITE CHARACTERISTICS 0
a, 322-001-13 Office: 425.486.6533 Fw: 425.486,6593 —.sdoengir��.com 2 CL
SnoScape Image
I.,
< Project NaL Figve ft 6�
SECTION 2
MINIMUM REQUIREMENT #1
PREPARATION OF STORMWATER SITE PLANS
Wiskerchen Residence
Technical Information Report
STORMWATER SITE PLANNING PROCESS
The City of Edmonds has adopted the 2005 Washington State Department of Ecology Stormwater
management Manual for the Puget Sound Basin as the governing design document for surface runoff
control. The following is a listing of the applicable minimum "core" and "special" requirements outlined in
Chapter 1 of the manual, with a brief description of how each was addressed:
0 Step 1: Collect and AnaWe Information on Existing Conditions
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash,
cherry, laurel and maple trees. The project site is surrounded by neighboring parcels on all sides,
with houses located on the parcels to the west, south, and east. The remaining parcel to the north
is also undeveloped. The site has a single drainage basin, which follows the natural topography
of the area and drains overland from east to west with an average lot slope of 21 %. Runoff can
be expected to follow the existing ground topography, and flow in a western direction, yet water is
not expected to leave the site due to soil characteristics with a high permeability for infiltration that
allows for natural ground water recharge.
Per NRCS Web Soil Survey, site soils consist of Alderwood Urban Land Complex. This material
is an unsorted mixture of loose to medium dense, reddish brown to tan silty sand with gravel and
scattered cobbles and boulders. Below depth ranging from approximately 2-4 feet, these
sediments became dense to very dense and grayish tan. The Alderwood Urban Land Complex
consists of an unsorted mixture of silt, sand and gravel that was deposited directly from basal,
debris laden glacial ice during the Vashon Stade of the Fraser Glaciation, approximately 12,500
to 15,000 years ago.
0 Step 2: Prepare a Preliminary Development Layout
The layout for the site is controlled primarily by the exterior boundaries of the parcel. The site has
a single drainage basin, which follows the natural topography of the area and drains overland
from east to west with an average lot slope of 21 %.
The Geotechnical Engineer for the project, Liu & Associates, INC, excavated test pits on site and
encountered Esperance sand deposits about 4 to 5 feet below existing grade. This deposit
appears to be of a high permeability and will be capable of supporting onsite stormwater
infiltration. Per Liu & Associates recommendation, a design infiltration rate of 4 inches per hour
can be used for the design of the infiltration trench. Refer to the Geotechnical report in Appendix
12-A.
Stormwater volumes will be mitigated onsite utilizing a 511 X 4.5'W X 45D infiltration trench and
2' diameter dry well to infiltrate all of the onsite stormwater, thus the site's release rate will be at
or below pre-existing flow rates. The infiltration trench has been designed utilizing the latest
version of WWHM3 continuous storm modeling software as per the 2005 DOE manual for
existing versus proposed drainage release rates.
There are no wetlands, wetland buffers, or critical areas onsite.
Site access will be provided from the northeast of the parcel with a driveway stemming off of 9 th
Ave N.
Wiskerchen Residence
Technical Information Report
0 Step 3: Perform Ofisite (Upstream and Downstream) Analysis
Due to the soil characteristics of the parcel and the surrounding area, all stormwater runoff will be
infiltrated onsite. No upstream or downstream analysis is necessary for this project, although a
small upstream basin has been incorporated into the infiltration drainage design. 369 SF of
existing driveway stormwater runoff has been included in the infiltration trench design.
0 Step 4: Determine Applicable Minimum Requirements
This project proposes to add greater than 5,000 SF of impervious surfaces to the site. Per Figure
2-1 in the City of Edmonds Stormwater Code Supplement, included below, this project can be
classified as a Category 2 Small Site Project. Category 2 Small Site Projects must analyze all 11
Minimum Requirements, although all may not be applicable.
FigLate 2-1: Project Classification
Does the project involve I -
me or more ofland- I Yes
No
Yes
Is the prcj&�a larger
common plan efdovelopmew
or sale where the total
di!turbed area for the emrre
plan rvill total I -acre or more
of 1and-dVWRWJkm*?
( I No ) r
Does the P,.)Nkj&AA1K. or more ofthe Yes
followiatt.
2,000 square feet or more of new impervious
surface, replaced impervicus surface or new
plus replaced icnpervious surface?
OR
7,000 square feet ofland-disturbing activity.
OR
50 cubic yards or more of either gradiiVfill,
or nxavatilon as defined in Chapter 18.40.000
ECDC!
No
Minor Site Project:
Read Chapter 3 and see
Chapter 6 for requirements
Large Site Project:
Read Chapter 3 and see
Chapter 4 for
requrrements
Does the project create or add 5,000 square feet of
new impenious surface, replaced impervious surface,
or new plus replaced impertious surface?
OR
Cenvert'/ acre or more ofnadveveyetation to lawn
or landscaped area
OR
Thro* a combination of creating tffective
unpersious sudWce and contyrredpertious,
surfaces, causes an increase of 0. 1 cubic feet per
second in the I Wyear flow frequency from a
threshold discharge area as estimated using an
approved ra��'
No
Category I Small Site Project: Category7Mall Site Project:
Read Chapi Read Chapter 3 and see Chapter
for I � 5 for requirements
' Assumes the project ca question meets applicability requirements ofECDC18.30.030.
0 Step 5: Prepare a Permanent Stormwater Control Plan
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash,
cherry, laurel and maple trees. The project site is surrounded by neighboring parcels on all sides,
with houses located on the parcels to the west, south, and east. The remaining parcel to the north
is also undeveloped. The site has a single drainage basin, which follows the natural topography
Wiskerchen Residence
Technical Information Report
of the area and drains overland from east to west with an average lot slope of 21 %. Runoff can
be expected to follow the existing ground topography, and flow in a western direction, yet water is
not expected to leave the site due to soil characteristics with a high permeability for infiltration and
natural ground water recharge.
The Geotechnical Engineer for the project, Liu & Associates, INC, excavated test pits on site and
encountered Esperance sand deposits about 4 to 5 feet below existing grade. This deposit
appears to be of a high permeability and will be capable of supporting onsite stormwater
infiltration. Per Liu & Associates recommendation, a design infiltration rate of 4 inches per hour
can be used for the design of the infiltration trench. Refer to the Geotechnical report in Appendix
12-A.
Stormwater volumes will be mitigated onsite utilizing a 5111 X 45W X 45D infiltration trench and
2' diameter dry well to infiltrate all of the onsite stormwater, thus the site's release rate will be at
or below pre-existing flow rates. The infiltration trench has been designed utilizing the latest
version of WWHM3 continuous storm modeling software as per the 2005 DOE manual for
existing versus proposed drainage release rates.
The infiltration trench has been designed utilizing the latest version of WWHM3 continuous storm
modeling software as per the 2005 DOE manual for existing versus proposed drainage release
rates.
a Step 6: Prepare a Stormwater Pollution Prevention Plan (SWPPP)
The 12 step outline is included in section 3 of this report. A construction SWPPP is included as
Appendix 3-A.
* Step 7: Complete the Stormwater Site Plan
Stormwater site plans are complete for this project and are included as part of this document.
Wiskerchen Residence
Technical Information Report
SECTION 3
MINIMUM REQUIREMENT #2
CONSTRUCTION STORMWATER POLLUTION
PREVENTION PLAN (SWPPP)
Wiskerchen Residence
Technical Information Report
A Stormwater Pollution Prevention Plan (SWPPP) is required to address 12 specific
pollution prevention elements DOE 2005 SWMMWW. These elements are listed and
summarily addressed below, with a full construction SWPPP included as appendix 3-A
in this report, which can be removed for convenience in the field.
1. Mark Clearing Limits
Clearing limits will be flagged or fenced by the contractor or project surveyor prior to
commencement of construction activity.
2. Establish Construction Access
A stabilized rock construction entrance will be installed at the entrance to the plat at the
onset of construction.
3. Detain Flows
Prior to significant clearing, a permanent infiltration facility shall be constructed, so that
it can be used for temporary sediment control. A temporary sediment BIVIP shall be
installed in order to ensure proper sediment control prior to infiltration. Once the facility
is constructed, the site shall be cleared and graded, and all surface water controls shall
direct runoff to this facility. When final grading is complete and the site is stabilized, the
temporary sediment riser shall be replaced with a permanent flow control structure.
4. Install Sediment Controls
Filter fabric fencing (silt fence) shall be installed around the downstream perimeter of
the site in order to keep sediment -laden stormwater from leaving the site. The fencing
shall be inspected periodically to ensure its continued effectiveness.
5. Stabilize Soils
Exposed soils shall be stabilized through mulching or hydroseeding when the not
actively worked for a significant period of time. Permanent vegetation shall be
established through hydroseeding once the site has reached final grade.
6. Protect Slopes
The temporary erosion and sediment control plan calls for the stabilization of exposed
soils through mulching or hydroseeding when the soils are not to be worked for a
significant period of time. The plan also calls for the establishment of permanent
vegetation through hydroseeding once the site has reached final grade.
7. Protect Drain Inlets
The temporary erosion and sediment control plan calls for a filter fabric sock to be
installed at all nearby catch basin inlets. Filter fabric protection shall be placed in all new
catch basins as they are installed.
8. Stabilize Channels and Outlets
All temporary interceptor swales shall contain check dams whenever a drop of 2 vertical
feet occurs. Water discharged from the sedimentation facility shall outfall onto a rip -rap
splash pad.
Wiskerchen Residence
Technical Information Report
9. Control Pollutants
All waste materials shall be disposed of in an approved location, in accordance with City
of Edmonds Standards. In order to reasonably prevent a contamination event (such as
a fuel spill), all major vehicle maintenance shall occur off -site to the greatest extent
practicable. The contractor shall provide a vehicle staging area near the entrance to the
site where all fueling and maintenance activity is likely to take place. This is intended to
contain the area in which a contamination event is likely to take place. The contractor
shall immediately contain and clean-up an area in which a contamination event occurs.
10. Control De -Watering
No significant dewatering is expected to occur during this project.
11. Maintain BMPs
All BIVIPs should be monitored and maintained regularly to ensure adequate operation.
A TESC supervisor shall be identified at the beginning of the project to provide
monitoring and direct the appropriate maintenance activity. As site conditions change,
all BIVIPs shall be updated as necessary to maintain compliance with City standards.
12. Manage the Project
The project will begin with a pre -construction conference in which an on -site TESC
supervisor shall be identified. The on -site supervisor shall monitor all TESC facilities
regularly and maintain a log of inspections and improvements to demonstrate
compliance with City standards. The project erosion control should be phased if the
weather forecast is not solid. Thus the site is cleared, stabilized with TESC measures,
and the moved on to the next phase. It will be important that the entire site is in
conformance with City of Edmonds erosion control standards at all times. The TESC
supervisor shall notify Site Development Associates of any problems with the proposed
erosion control elements, or if any revisions to the plan need to be made. Additional
erosion control materials, such as filter fabric fencing, cover plastic, and straw bales,
shall be kept on -site at all times in the event that an erosion control feature needs to be
replaced or installed.
13. Protect Low Impact Development BMPs
Portions of the site that drain into infiltration trench will be protected from sedimentation
through the installation and maintenance of erosion and sediment control BIVIPs. The
infiltration trench will be protected from compaction due to construction equipment and
foot traffic to retain the infiltration rate of the soil.
Wiskerchen Residence
Technical Information Report
APPENDIX 3-A
CONSTRUCTION SWPPP
Wiskerchen Residence
Technical Information Report
CSINPPP ANALYSIS & DESIGN
This section of the report, along with the Temporary Erosion and Sediment Control (TESC) Plan
included in the engineering drawings, is intended to serve as the construction Stormwater
Pollution Prevention Plan (SWPPP) for the project. The SWPPP is outlined in conformance with
the 2005 edition of the Washington State Department of Ecology's Stormwater Managemen
Manual for Western Washington (DOE Manual).
STEPS 1&2 —DATA COLLECTION& ANALYSIS
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash,
cherry, laurel and maple trees. The project site is surrounded by neighboring parcels on all
sides, with houses located on the parcels to the west, south, and east. The remaining parcel to
the north is also undeveloped. The site has a single drainage basin, which follows the natural
topography of the area and drains overland from east to west with an average lot slope of 21 %.
Runoff can be expected to follow the existing ground topography, and flow in a western
direction.
Per NRCS Web Soil Survey, site soils consist of Alderwood Urban Land Complex. This material
is an unsorted mixture of loose to medium dense, reddish brown to tan silty sand with gravel
and scattered cobbles and boulders. Below depth ranging from approximately 2-4 feet, these
sediments became dense to very dense and grayish tan. The Alderwood Urban Land Complex
consists of an unsorted mixture of silt, sand and gravel that was deposited directly from basal,
debris laden glacial ice during the Vashon Stade of the Fraser Glaciation, approximately 12,500
to 15,000 years ago.
STEP 3 — CONSTRUCTION SWPPP DEVELOPMENT AND IMPLEMENTATION
The development and implementation of this SWPPP shall consist of 12 specific elements, as
outlined in the DOE Manual. They are:
1. Mark Clearing Limits
Clearing limits will be flagged or fenced by the contractor or project surveyor prior to
commencement of construction activity.
2. Establish Construction Access
A stabilized rock construction entrance will be installed at the entrance to the plat at
the onset of construction.
3. Detain Flows
Prior to significant clearing, the permanent infiltration facility shall be constructed, so
that it can be used for temporary sediment control. A temporary sediment BMP shall
be installed in order to ensure proper sediment control. Once the facility is
constructed, the site shall be cleared and graded, and all surface water controls shall
direct runoff to this facility. When final grading is complete and the site is stabilized,
the temporary sediment riser shall be replaced with a permanent flow control
structure.
Wiskerchen Residence
Technical Information Report
4. Install Sediment Controls
Filter fabric fencing (silt fence) shall be installed around the downstream perimeter of
the site in order to keep sediment -laden stormwater from leaving the site. The
fencing shall be inspected periodically to ensure its continued effectiveness.
5. Stabilize Soils
Exposed soils shall be stabilized through mulching or hydroseeding when the not
actively worked for a significant period of time. Permanent vegetation shall be
established through hydroseeding once the site has reached final grade.
6. Protect Slopes
The temporary erosion and sediment control plan calls for the stabilization of
exposed soils through mulching or hydroseeding when the soils are not to be worked
for a significant period of time. The plan also calls for the establishment of permanent
vegetation through hydroseeding once the site has reached final grade.
7. Protect Drain Inlets
The temporary erosion and sediment control plan calls for a filter fabric sock to be
installed at all nearby catch basin inlets. Filter fabric protection shall be placed in all
new catch basins as they are installed.
8. Stabilize Channels and Outlets
All temporary interceptor swales shall contain check dams whenever a drop of 2
vertical feet occurs. Water discharged from the sedimentation facility shall outfall
onto a rip -rap splash pad.
9. Control Pollutants
All waste materials shall be disposed of in an approved location, in accordance with
City of Edmonds standards. In order to reasonably prevent a contamination event
(such as a fuel spill), all major vehicle maintenance shall occur off -site to the greatest
extent practicable. The contractor shall provide a vehicle staging area near the
entrance to the site where all fueling and maintenance activity is likely to take place.
This is intended to contain the area in which a contamination event is likely to take
place. The contractor shall immediately contain and clean-up an area in which a
contamination event occurs.
10. Control Dewatering
No significant dewatering is expected to occur during this project.
11. Maintain BMPs
All BIVIPs should be monitored and maintained regularly to ensure adequate
operation. A TESC supervisor shall be identified at the beginning of the project to
Wiskerchen Residence
Technical Information Report
provide monitoring and direct the appropriate maintenance activity. As site
conditions change, all BlVlPs shall be updated as necessary to maintain compliance
with City standards.
12. Manage the Project
The project will begin with a pre -construction conference in which an on -site TESC
supervisor shall be identified. The on -site supervisor shall monitor all TESC facilities
regularly and maintain a log of inspections and improvements to demonstrate
compliance with City standards. The project is not large enough to be effectively
phased; therefore, it will be important that the entire site is in conformance with City
of Edmonds erosion control standards at all times. The TESC supervisor shall notify
Site Development Associates of any problems with the proposed erosion control
elements, or if any revisions to the plan need to be made. Additional erosion control
materials, such as filter fabric fencing, cover plastic, and straw bales, shall be kept
on -site at all times in the event that an erosion control feature needs to be replaced
or installed.
13. Protect Low Impact Development BMPs
Portions of the site that drain into infiltration trench will be protected from
sedimentation through the installation and maintenance of erosion and sediment
control BlVlPs. The infiltration trench will be protected from compaction due to
construction equipment and foot traffic to retain the infiltration rate of the soil.
Wiskerchen Residence
Technical Information Report
SECTION 4
MINIMUM REQUIREMENT #3
SOURCE CONTROL OF POLLUTION
Wiskerchan Residence
Technical Information Report
Source Control Narrative
There are no hazardous materials proposed to be on site that would require source control BMP's.
Wiskerchen Residence
Technical Information Report
SECTION 5
MINIMUM REQUIREMENT #4
PRESERVATION OF NATURAL DRAINAGE SYSTEMS
AND OUTFALLS
Wiskerchen Residence
Technical Information Report
NATURAL DRAINAGE COURSE DESCRIPTION
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash, cherry,
laurel and maple trees. The project site is surrounded by neighboring parcels on all sides, with houses
located on the parcels to the west, south, and east. The remaining parcel to the north is also
undeveloped. The site has a single drainage basin, which follows the natural topography of the area and
drains overland from east to west with an average lot slope of 21 %. Runoff can be expected to follow the
existing ground topography, and flow in a western direction, yet water is not expected to leave the site
due to soil characteristics with a high permeability for infiltration that allows for natural ground water
recharge.
Per NRCS Web Soil Survey, site soils consist of Alderwood Urban Land Complex. This material is an
unsorted mixture of loose to medium dense, reddish brown to tan silty sand with gravel and scattered
cobbles and boulders. Below depth ranging from approximately 2-4 feet, these sediments became dense
to very dense and grayish tan. The Alderwood Urban Land Complex consists of an unsorted mixture of
silt, sand and gravel that was deposited directly from basal, debris laden glacial ice during the Vashon
Stade of the Fraser Glaciation, approximately 12,500 to 15,000 years ago.
The Geotechnical Engineer for the project, Liu & Associates, INC, excavated test pits on site and
encountered Esperance sand deposits about 4 to 5 feet below existing grade. This deposit appears to be
of a high permeability and will be capable of supporting onsite stormwater infiltration. Per Liu &
Associates recommendation, a design infiltration rate of 4 inches per hour can be used for the design of
the infiltration trench. Refer to the Geotechnical report in Appendix 12-A.
Stormwater volumes will be mitigated onsite utilizing a 5111 X 45W X 45D infiltration trench and 2'
diameter dry well to infiltrate all of the onsite stormwater, thus the site's release rate will be at or below
pre-existing flow rates. The infiltration trench has been designed utilizing the latest version of WWHM3
continuous storm modeling software as per the 2005 DOE manual for existing versus proposed drainage
release rates.
The infiltration trench is located in the southeast corner of the lot, while the drywell is located in the
southwest corner of the lot. These facilities ensure all stormwater is collected form the site. All PGIS,
along with all the NPGIS from the roof will be routed directly to the infiltration trench. Stormwater from the
patios located in the back yard will be conveyed to the drywell.
Wiskerchen Residence
Technical Information Report
SECTION 6
MINIMUM REQUIREMENT #5
ON -SITE STORMWATER MANAGEMENT
Wiskerchen Residence
Technical Information Report
11
Existing Site Hydrology
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash, cherry,
laurel and maple trees. The project site is surrounded by neighboring parcels on all sides, with houses
located on the parcels to the west, south, and east. The remaining parcel to the north is also
undeveloped. The site has a single drainage basin, which follows the natural topography of the area and
drains overland from east to west with an average lot slope of 21 %. Runoff can be expected to follow the
existing ground topography, and flow in a western direction, yet water is not expected to leave the site
due to soil characteristics with a high permeability for infiltration that allows for natural ground water
recharge.
Per NRCS Web Soil Survey, site soils consist of Alderwood Urban Land Complex. This material is an
unsorted mixture of loose to medium dense, reddish brown to tan silty sand with gravel and scattered
cobbles and boulders. Below depth ranging from approximately 2-4 feet, these sediments became dense
to very dense and grayish tan. The Alderwood Urban Land Complex consists of an unsorted mixture of
silt, sand and gravel that was deposited directly from basal, debris laden glacial ice during the Vashon
Stade of the Fraser Glaciation, approximately 12,500 to 15,000 years ago.
Developed Site Hydrology
The Geotechnical Engineer for the project, Liu & Associates, INC, excavated test pits on site and
encountered Esperance sand deposits about 4 to 5 feet below existing grade. This deposit appears to be
of a high permeability and will be capable of supporting onsite stormwater infiltration. Per Liu &
Associates recommendation, a design infiltration rate of 4 inches per hour can be used for the design of
the infiltration trench. Refer to the Geotechnical report in Appendix 12-A.
Stormwater volumes will be mitigated onsite utilizing a 511 X 4.5'W X 45D infiltration trench and 2'
diameter dry well to infiltrate all of the onsite stormwater, thus the site's release rate will be at or below
pre-existing flow rates. The infiltration trench has been designed utilizing the latest version of WWHM3
continuous storm modeling software as per the 2005 DOE manual for existing versus proposed drainage
release rates.
The infiltration trench is located in the southeast corner of the lot, while the drywell is located in the
southwest corner of the lot. These facilities ensure all stormwater is collected form the site. All PGIS,
along with all the NPGIS from the roof will be routed directly to the infiltration trench. Stormwater from the
patios located in the back yard will be conveyed to the drywell.
Performance Standards
Flow Control and Stormwater Quality elements are subject to the requirements of the 2005 Washington
State Department of Ecology Stormwater Management Manual for the Puget Sound Basin. The modeling
software used for both water quality treatment design flows and volumes, and detention volume
calculations and release rates is version 3.0 of the WWHM3 Continuous Stormwater Modeling Software.
Wiskerchen Residence
Technical Information Report
SECTION 7
MINIMUM REQUIREMENT #6
RUNOFF TREATMENT
Wiskerchen Residence
Technical Information Report
PROJECT RUNOFF TREATMENT DESIGN OVERVIEW
Water quality treatment is not required on this project due to the limited amount of PGIS on this site. An
oil water separator will be installed and utilized for runoff originating from the driveway, before releasing to
the infiltration trench.
Wiskerchen Residence
Technical Information Report
SECTION 8
MINIMUM REQUIREMENT #7
FLOW CONTROL
Wiskerchen Residence
Technical Information Report
Existing Site Hydrology
The site is currently undeveloped, primarily consisting of pastured lawn with a scattering of ash, cherry,
laurel and maple trees. The project site is surrounded by neighboring parcels on all sides, with houses
located on the parcels to the west, south, and east. The remaining parcel to the north is also
undeveloped. The site has a single drainage basin, which follows the natural topography of the area and
drains overland from east to west with an average lot slope of 21 %. Runoff can be expected to follow the
existing ground topography, and flow in a western direction, yet water is not expected to leave the site
due to soil characteristics with a high permeability for infiltration that allows for natural ground water
recharge.
Per NRCS Web Soil Survey, site soils consist of Alderwood Urban Land Complex. This material is an
unsorted mixture of loose to medium dense, reddish brown to tan silty sand with gravel and scattered
cobbles and boulders. Below depth ranging from approximately 2-4 feet, these sediments became dense
to very dense and grayish tan. The Alderwood Urban Land Complex consists of an unsorted mixture of
silt, sand and gravel that was deposited directly from basal, debris laden glacial ice during the Vashon
Stade of the Fraser Glaciation, approximately 12,500 to 15,000 years ago.
Developed Site Hydrology
The Geotechnical Engineer for the project, Liu & Associates, INC, excavated test pits on site and
encountered Esperance sand deposits about 4 to 5 feet below existing grade. This deposit appears to be
of a high permeability and will be capable of supporting onsite stormwater infiltration. Per Liu &
Associates recommendation, a design infiltration rate of 4 inches per hour can be used for the design of
the infiltration trench. Refer to the Geotechnical report in Appendix 12-A.
Stormwater volumes will be mitigated onsite utilizing a 511 X 4.5'W X 45D infiltration trench and 2'
diameter dry well to infiltrate all of the onsite stormwater, thus the site's release rate will be at or below
pre-existing flow rates. The infiltration trench has been designed utilizing the latest version of WWHM3
continuous storm modeling software as per the 2005 DOE manual for existing versus proposed drainage
release rates.
The infiltration trench is located in the southeast corner of the lot, while the drywell is located in the
southwest corner of the lot. These facilities ensure all stormwater is collected form the site. All PGIS,
along with all the NPGIS from the roof will be routed directly to the infiltration trench. Stormwater from the
patios located in the back yard will be conveyed to the drywell.
Performance Standards
Flow Control and Stormwater Quality elements are subject to the requirements of the 2005 Washington
State Department of Ecology Stormwater Management Manual for the Puget Sound Basin. The modeling
software used for both water quality treatment design flows and volumes, and detention volume
calculations and release rates is version 3.0 of the WWHM3 Continuous Stormwater Modeling Software.
Wiskerchen Residence
Technical Information Report
APPENDIX 8-A
FLOW CONTROL
DESIGN CALCULATIONS
Wiskerchen Residence
Technical Information Report
Infiltration Trench Design
The infiltration trench was modeled using the Puget Sound 36 precipitation input file with WWHM3, per
the Edmonds Stormwater Code supplement Chapter 5.7.
As seen in the image below, the "precipitation applied to facility" box is checked, and the "use wetted
surface area" for infiltration is set to "NO".
IF 1.1
C-i
dz;=
MIN
13� Grarvel Tremh Bed I Wfigted
Facility Name lGravel Tramch Bad 1
Outlet I
Outlet 2 Outlet 3
Danirnstreann Connection
Facility Type
lGiarvell Tramch/Bed
�L-A�
F �,-O
0�4ickTrench
F ci:ity Bottom Elevation (11) 1125
F:ci ity Dimensions
Trench
Outlet Structure
Ttewh=Wdh
Rim Hedt (4) r3. 5 -�H
Effecb" Total Depth
10100i
Rti,at Diameter(irt) FG--
Bottom Jope of Trervch
01
Ri-TYP- rF9---j
Left Side Slove
Notch Type
A91V Side Slope
BE
Material Layers for
LaW 1 Thcl,� (R)
Orifice DiumeterHeight OMax
Lay. 1 pomity
Number On) OFQ (do)
Lay.2THck—(ftJ
I ra--i Fo— --.,A 0
Law 2 poiay
2 F0-- --I ro--H 0
LW.3Th.k—(ftl
10— 7 7
3 ro--�-ij F0--Aj 0
Layer 3 pao*
Infiltration ws— -1
T,amhVok—atRi—Head(acm4t) .007
MeauredirfliationRale(irift) r4 —
Pond Imaramt F0 10 .1
—Table
��aihonneducbwl`actor rl—
Show Pond Table rOp- --.'i
Uft Wetted S.lace Area Weviah) [N()
TotalVok,me InWaLedfacra4t) 51.719
Total Vokime Thrmgh FacilMw") 51.748
okimeThrotighRim(acre-1t) OL029
Pacertt Infibated 99.94
The following table details the breakdown of impervious surfaces used as inputs in the WWHM3
calculation.
Impervious Surfaces
Roof + Garage
3,459
SF
.079
Acres
New Driveway
1,581
SF
.036
Acres
Patios
241
SF
.006
Acres
Upstream Driveways
369
SF
.008
Acres
I
I
I
I
I
Totals
1 5,650
1 SF
1
1 .130
1 Ac
Total Roof Impervious .08 Acres
Total Road Impervious .05 Acres
Total Site Impervious= .13Acres
The infiltration trench was sized to accommodate aH of the impervious surface flows from the site. Yet,
the proposed design also incorporates a drywell in the southwest corner that will accept a small portion of
the flows from the back patios only.
Upstream Driveway Run-on
Per the Snoscape image provided below, elevation contours illustrate the majority of the
existing driveway slopes towards the northwest and does not flow towards the proposed
project site.
EC SITE Total area incorporated
into design
/r
[Area flowing onto property
The proposed stormwater design incorporates a 369 SF area of existing driveway, an
approximately 13' X 28' in size, which according to this contour map, over estimates the
amount of upstream area.
This upstream basin has been included in the infiltration trench design calculation.
Western Washington Hydrology Model
PROJECT REPORT
Project Name: 322-001 Wiskerchen Residence
Site Address:
City
Report Date : 9/12/2013
M'Q,9JFXkdrq knfX detjl�z;�rgt 36
Data Start 1939/10/1
Data End 2097/08/31
DOT Data Number: 03
WWHM3 Version:
PREDEVELOPED LAND USE
Name : Predeveloped
Bypass: No
GroundWater: No
Pervious Land Use Acres
C, Forest, Mod .05
C, Forest, Steep .08
Impervious Land Use Acres
Element Flows To:
Surface Interflow Groundwater
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use
Acres
Impervious Land Use
Acres
ROADS FLAT
0.05
ROOF TOPS FLAT
0.08
Element Flows To:
Surface Interflow Groundwater
Gravel Trench Bed 1, Gravel Trench Bed 1,
Name : Gravel Trench Bed I
Bottom Length: 57ft.
Bottom Width: 4ft.
Trench bottom slope 1: 0.0001 To I
Trench Left side slope 0: 0.0001 To I
Trench right side slope 2: 0.0001 To 1
Material thickness of first layer: 4.5
Pour Space of material for first layer: 0.35
Material thickness of second layer: 0
Pour Space of material for second layer: 0
Material thickness of third layer: 0
Pour Space of material for third layer: 0
WWHM3 Trench size 57'X 4'= 228 SF
Modified to:
Proposed Trench size 51 * 4.5 = 229.5 SF
Infiltration On
Infiltration rate : 4
Infiltration safety factor : 1
Discharge Structure
Riser Height: 3.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet I Outlet 2
Gravel Trench Bed Hydraulic Table
Staoe(ft) Area(acr) Volume(acr-ft) Dschra(cfs) Infilt(cfs
125.0
0.005
0.000
0.000
0.000
125.1
0.005
0.000
0.000
0.021
125.1
0.005
0.000
0.000
0.021
125.2
0.005
0.000
0.000
0.021
125.2
0.005
0.000
0.000
0.021
125.3
0.005
0.000
0.000
0.021
125.3
0.005
0.001
0.000
0.021
125.4
0.005
0.001
0.000
0.021
125.4
0.005
0.001
0.000
0.021
125.5
0.005
0.001
0.000
0.021
125.5
0.005
0.001
0.000
0.021
125.6
0.005
0.001
0.000
0.021
125.6
0.005
0.001
0.000
0.021
125.7
0.005
0.001
0.000
0.021
125.7
0.005
0.001
0.000
0.021
125.8
0.005
0.001
0.000
0.021
125.8
0.005
0.001
0.000
0.021
125.9
0.005
0.002
0.000
0.021
125.9
0.005
0.002
0.000
0.021
126.0
0.005
0.002
0.000
0.021
126.0
0.005
0.002
0.000
0.021
126.1
0.005
0.002
0.000
0.021
126.1
0.005
0.002
0.000
0.021
126.2
0.005
0.002
0.000
0.021
126.2
0.005
0.002
0.000
0.021
126.3
0.005
0.002
0.000
0.021
126.3
0.005
0.002
0.000
0.021
126.4
0.005
0.002
0.000
0.021
126.4
0.005
0.003
0.000
0.021
126.5
0.005
0.003
0.000
0.021
126.5
0.005
0.003
0.000
0.021
126.6
0.005
0.003
0.000
0.021
126.6
0.005
0.003
0.000
0.021
126.7
0.005
0.003
0.000
0.021
126.7
0.005
0.003
0.000
0.021
126.8
0.005
0.003
0.000
0.021
126.8
0.005
0.003
0.000
0.021
126.9
0.005
0.003
0.000
0.021
126.9
0.005
0.003
0.000
0.021
127.0
0.005
0.004
0.000
0.021
127.0
0.005
0.004
0.000
0.021
127.1
0.005
0.004
0.000
0.021
127.1
0.005
0.004
0.000
0.021
127.2
0.005
0.004
0.000
0.021
127.2
0.005
0.004
0.000
0.021
127.3
0.005
0.004
0.000
0.021
127.3
0.005
0.004
0.000
0.021
127.4
0.005
0.004
0.000
0.021
127.4
0.005
0.004
0.000
0.021
127.5
0.005
0.004
0.000
0.021
127.5
0.005
0.005
0.000
0.021
127.6
0.005
0.005
0.000
0.021
127.6
0.005
0.005
0.000
0.021
127.7
0.005
0.005
0.000
0.021
127.7
0.005
0.005
0.000
0.021
127.8
0.005
0.005
0.000
0.021
127.8
0.005
0.005
0.000
0.021
127.9
0.005
0.005
0.000
0.021
127.9
0.005
0.005
0.000
0.021
128.0
0.005
0.005
0.000
0.021
128.0
0.005
0.005
0.000
0.021
128.1
0.005
0.006
0.000
0.021
128.1
0.005
0.006
0.000
0.021
128.2
0.005
0.006
0.000
0.021
128.2
0.005
0.006
0.000
0.021
128.3
0.005
0.006
0.000
0.021
128.3
0.005
0.006
0.000
0.021
128.4
0.005
0.006
0.000
0.021
128.4
0.005
0.006
0.000
0.021
128.5
0.005
0.006
0.000
0.021
128.5
0.005
0.006
0.000
0.021
128.6
0.005
0,007
0.054
0.021
128.6
0.005
0.007
0.154
0.021
128.7
0.005
0.007
0.283
0.021
128.7
0.005
0.007
0.436
0.021
128.8
0.005
0.007
0.609
0.021
128.8
0.005
0.007
0.800
0.021
128.9
0.005
0.007
1.008
0.021
128.9
0.005
0.007
1.232
0.021
129.0
0.005
0.007
1.470
0.021
129.0
0.005
0.007
1.722
0.021
129.1
0.005
0.007
1.986
0.021
129.1
0.005
0.008
2.263
0.021
129.2
0.005
0.008
2.552
0.021
129.2
0.005
0.008
2.852
0.021
129.3
0.005
0.008
3.163
0.021
129.3
0.005
0.008
3.484
0.021
129.4
0.005
0.008
3.816
0.021
129.4
0.005
0.008
4.158
0.021
129.5
0.005
0.008
4.509
0.021
129.5
0.005
0.008
4.869
0.021
MITIGATED LAND USE
ANALYSIS RESULTS
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year
0.003027
5 year
0.004871
10 year
0.005896
25 year
0.006953
50 year
0.007587
100 year
0.00811
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0
5 year 0
10 year 0
25 year 0
50 year 0
100 year 0
Yearly Peaks for Precleveloped and Mitigated. POC #1
Year PreclevelODed Mitioated
1941
0.004
0.000
1942
0.001
0.000
1943
0.004
0.000
1944
0.002
0.000
1945
0.001
0.000
1946
0.005
0.000
1947
0.003
0.000
1948
0.003
0.000
1949
0.005
0.000
1950
0.003
0.000
1951
0.010
0.000
1952
0.004
0.000
1953
0.001
0.014
1954
0.001
0.000
1955
0.002
0.000
1956
0.001
0.000
1957
0.003
0.000
1958
0.002
0.000
1959
0.003
0.000
1960
0.003
0.000
1961
0.003
0.000
1962
0.003
0.000
1963
0.001
0.000
1964
0.001
0.000
1965
0.002
0.000
1966
0.003
0.000
1967
0.002
0.000
1968
0.005
0.000
1969
0.003
0.000
1970
0.003
0.000
1971
0.002
0.000
1972
0.002
0.000
1973
0.006
0.000
1974
0.002
0.000
1975
0.004
0.000
1976
0.004
0.000
1977
0.003
0.000
1978
0.000
0.000
1979
0.003
0.000
1980
0.003
0.000
1981
0.004
0.000
1982
0.001
0.000
1983
0.005
0.000
1984
0.003
0.000
1985
0.003
0.000
1986
0.002
0.000
1987
0.006
0.000
1988
0.005
0.000
1989
0.003
0.000
1990
0.003
0.000
1991
0.010
0.025
1992
0.008
0.018
1993
0.003
0.000
1994
0.002
0.000
1995
0.001
0.000
1996
0.003
0.000
1997
0.008
0.000
1998
0.004
0.000
1999
0.002
0.000
2000
0.005
0.010
2001
0.003
0.000
2002
0.001
0.000
2003
0.003
0.000
2004
0.006
0.000
2005
0.001
0.000
2006
0.002
0.000
2007
0.003
0.000
2008
0.002
0.000
2009
0.004
0.000
2010
0.006
0.000
2011
0.005
0.032
2012
0.004
0.000
2013
0.003
0.000
2014
0.007
0.011
2015
0.003
0.000
2016
0.002
0.000
2017
0.006
0.000
2018
0.001
0.000
2019
0.003
0.000
2020
0.003
0.000
2021
0.002
0.000
2022
0.005
0.000
2023
0.001
0.000
2024
0.003
0.000
2025
0.002
0.000
2026
0.005
0.000
2027
0.004
0.000
2028
0.003
0.000
2029
0.003
0.000
2030
0.003
0.000
2031
0.004
0.000
2032
0.003
0.000
2033
0.006
0.000
2034
0.001
0.000
2035
0.006
0.000
2036
0.003
0.000
2037
0.003
0.000
2038
0.000
0.000
2039
0.002
0.000
2040
0.002
0.000
2041
0.005
0.000
2042
0.003
0.000
2043
0.004
0.000
2044
0.005
0.000
2045
0.002
0.000
2046
0.002
0,000
2047
0.003
0.000
2048
0.002
0.000
2049
0.001
0.000
2050
0.002
0.000
2051
0.004
0.004
2052
0.002
0.000
2053
0.001
0.000
2054
0.007
0.000
2055
0.001
0.000
2056
0.005
0.000
2057
0.008
0.000
2058
0.010
0.007
2059
0.003
0.000
2060
0.004
0.000
2061
0.001
0.000
2062
0.003
0. 000
2063
0.011
0.020
2064
0.003
0.000
2065
0.004
0.000
2066
0.002
0.000
2067
0.001
0.000
2068
0.003
0.000
2069
0.007
0.000
2070
0.002
0.000
2071
0.001
0.000
2072
0.001
0.000
2073
0.002
0.000
2074
0.007
0.000
2075
0.004
0.000
2076
0.001
0.000
2077
0.004
0.000
2078
0.000
0.000
2079
0.001
0.000
2080
0.002
0.000
2081
0.008
0.014
2082
0.003
0.000
2083
0.004
0.000
2084
0.003
0.000
2085
0.003
0.000
2086
0.002
0.000
2087
0.003
0.000
2088
0.003
0.000
2089
0.002
0.000
2090
0.004
0.000
2091
0.002
0.000
2092
0.003
0.000
2093
0.005
0.005
2094
0.001
0.000
2095
0.001
0.000
2096
0.002
0.000
2097
0.002
0.000
2098
0.005
0.000
Ranked Yearly Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1
0.0110
0.0316
2
0.0098
0.0246
3
0.0098
0.0196
4
0.0095
0.0178
5
0.0082
0.0141
6
0.0080
0.0138
7
0.0078
0.0105
8
0.0078
0.0103
9
0.0071
0.0073
10
0.0068
0.0047
11
0.0067
0.0038
12
0.0066
0.0000
13
0.0063
0.0000
14
0.0063
0.0000
15
0.0060
0.0000
16
0.0060
0.0000
17
0.0059
0.0000
18
0.0058
0.0000
19
0.0056
0.0000
20
0.0054
0.0000
21
0.0053
0.0000
22
0.0053
0.0000
23
0.0053
0.0000
24
0.0052
0.0000
25
0.0052
0.0000
26
0.0051
0.0000
27
0.0050
0.0000
28
0.0050
0.0000
29
0.0049
0.0000
30
0.0048
0.0000
31
0.0047
0.0000
32
0.0046
0.0000
33
0.0045
0.0000
34
0,0045
0.0000
35
0.0044
0.0000
36
0.0044
0.0000
37
0.0043
0.0000
38
0.0042
0.0000
39
0.0041
0.0000
40
0.0041
0.0000
41
0.0040
0.0000
42
0.0039
0.0000
43
0.0038
0.0000
44
0.0038
0.0000
45
0.0038
0.0000
46
0.0037
0.0000
47
0.0037
0.0000
48
0.0036
0.0000
49
0.0036
0.0000
50
0.0036
0.0000
51
0.0036
0.0000
52
0.0035
0.0000
53
0.0034
0.0000
54
0.0034
0.0000
55
0.0033
0.0000
56
0.0033
0.0000
57
0.0033
0.0000
58
0.0032
0.0000
59
0.0032
0.0000
60
0.0032
0.0000
61
0.0032
0.0000
62
0.0031
0.0000
63
0.0031
0.0000
64
0.0031
0.0000
65
0.0031
0.0000
66
0.0031
0.0000
67
0.0031
0.0000
68
0.0030
0.0000
69
0.0030
0.0000
70
0.0030
0.0000
71
0.0029
0.0000
72
0.0029
0.0000
73
0.0029
0.0000
74
0.0028
0.0000
75
0.0028
0.0000
76
0.0028
0.0000
77
0.0028
0.0000
78
0.0028
0,0000
79
0.0028
0.0000
80
0.0028
0.0000
81
0.0028
0.0000
82
0.0027
0.0000
83
0.0027
0.0000
84
0.0027
0.0000
85
0.0027
0.0000
86
0.0027
0.0000
87
0.0027
0.0000
88
0.0027
0.0000
89
0.0026
0.0000
90
0.0026
0.0000
91
0.0026
0.0000
92
0.0026
0.0000
93
0.0026
0.0000
94
0.0026
0.0000
95
0.0026
0.0000
96
0.0026
0.0000
97
0.0025
0.0000
98
0.0025
0.0000
99
0.0025
0.0000
100
0.0024
0.0000
101
0.0023
0.0000
102
0.0023
0.0000
103
0.0023
0.0000
104
0.0023
0.0000
105
0.0023
0.0000
106
0.0022
0.0000
107
0.0022
0.0000
108
0.0021
0.0000
109
0.0021
0.0000
110
0.0021
0.0000
111
0.0021
0.0000
112
0.0021
0.0000
113
0.0021
0.0000
114
0.0020
0.0000
115
0.0020
0.0000
116
0.0020
0.0000
117
0.0020
0.0000
118
0.0019
0.0000
119
0.0019
0.0000
120
0.0019
0.0000
121
0.0019
0.0000
122
0.0019
0.0000
123
0.0018
0.0000
124
0.0018
0.0000
125
0.0018
0.0000
126
0.0017
0.0000
127
0.0017
0.0000
128
0.0017
0.0000
129
0.0017
0.0000
130
0.0016
0.0000
131
0.0015
0.0000
132
0.0015
0.0000
133
0.0015
0.0000
134
0.0015
0.0000
135
0.0014
0.0000
136
0.0014
0.0000
137
0.0014
0.0000
138
0.0014
0.0000
139
0.0014
0.0000
140
0.0014
0.0000
141
0.0014
0.0000
142
0.0014
0.0000
143
0.0014
0.0000
144
0.0014
0.0000
145
0.0014
0.0000
146
0.0013
0.0000
147
0.0013
0.0000
148
0.0012
0.0000
149
0.0012
0.0000
150
0.0011
0.0000
151
0.0011
0.0000
152
0.0010
0.0000
153
0.0010
0.0000
154
0.0009
0.0000
155
0.0007
0.0000
156
0.0003
0.0000
157
0.0003
0.0000
158
0.0000
0.0000
POC #1
The Facility PASSED
The Facility PASSED.
Flow(CFS) Predev
0.0015
9328
30
0.0016
8537
30
0.0016
7821
30
0.0017
7182
30
0.0018
6602
30
0.0018
6102
30
0.0019
5640
30
0.0019
5206
30
0.0020
4801
30
0.0021
4451
30
0.0021
4129
29
0.0022
3836
29
0.0022
3545
29
0.0023
3295
29
0.0024
3072
29
0.0024
2856
29
0.0025
2652
29
0.0026
2449
29
0.0026
2279
29
0.0027
2132
29
0.0027
1996
29
0.0028
1854
29
0.0029
1759
29
0.0029
1649
29
0.0030
1557
29
0.0030
1458
29
0.0031
1378
29
0.0032
1300
29
0.0032
1225
29
0.0033
1158
29
0.0034
1093
29
0.0034
1034
29
0.0035
976
29
0.0035
922
29
0.0036
874
29
0.0037
816
29
Dev Percentage Pass/Fail
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
0
Pass
I
Pass
1
Pass
1
Pass
1
Pass
1
Pass
1
Pass
1
Pass
1
Pass
1
Pass
1
Pass
1
Pass
2
Pass
2
Pass
2
Pass
2
Pass
2
Pass
2
Pass
2
Pass
3
Pass
3
Pass
3
Pass
0.0037
767
29
3
Pass
0.0038
721
29
4
Pass
0.0038
686
27
3
Pass
0.0039
661
27
4
Pass
0.0040
636
27
4
Pass
0.0040
612
27
4
Pass
0.0041
588
27
4
Pass
0.0042
566
27
4
Pass
0.0042
538
27
5
Pass
0.0043
520
27
5
Pass
0.0043
500
27
5
Pass
0.0044
479
27
5
Pass
0.0045
458
26
5
Pass
0.0045
439
25
5
Pass
0.0046
418
24
5
Pass
0.0046
402
24
5
Pass
0.0047
385
24
6
Pass
0.0048
362
22
6
Pass
0.0048
341
22
6
Pass
0.0049
328
22
6
Pass
0.0049
313
22
7
Pass
0.0050
292
22
7
Pass
0.0051
279
22
7
Pass
0.0051
264
22
8
Pass
0.0052
248
22
8
Pass
0.0053
242
22
9
Pass
0.0053
227
22
9
Pass
0.0054
220
22
10
Pass
0.0054
206
22
10
Pass
0.0055
203
22
10
Pass
0.0056
191
22
11
Pass
0.0056
181
22
12
Pass
0.0057
171
22
12
Pass
0.0057
166
22
13
Pass
0.0058
156
22
14
Pass
0.0059
145
21
14
Pass
0.0059
135
21
15
Pass
0.0060
129
21
16
Pass
0.0061
113
21
18
Pass
0.0061
Ill
21
18
Pass
0.0062
102
21
20
Pass
0.0062
98
21
21
Pass
0.0063
89
21
23
Pass
0.0064
85
21
24
Pass
0.0064
78
21
26
Pass
0.0065
73
21
28
Pass
0.0065
70
21
30
Pass
0.0066
62
21
33
Pass
0.0067
61
20
32
Pass
0.0067
53
20
37
Pass
0.0068
52
20
38
Pass
0.0069
48
20
41
Pass
0.0069
43
20
46
Pass
0.0070
39
20
51
Pass
0.0070
36
20
55
Pass
0.0071
34
20
58
Pass
0.0072
30
20
66
Pass
0.0072
28
20
71
Pass
0.0073
26
20
76
Pass
0.0073
24
18
75
Pass
0.0074
21
18
85
Pass
0.0075
20
18
90
Pass
0.0075 20 18 90 Pass
0.0076 18 18 100 Pass
Water Quality BMP Flow and Volume for POC 1.
On-line facility volume: 0 acre-feet
On-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Off-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Perind and ImpInd Changes
No changes have been made.
This program and accompanying documentation is provided 'as -is' without warranty of any kind. The entire risk
regarding the performance and results of this program is assumed by the user. Clear Creek Solutions and the
Washington State Department of Ecology disclaims all warranties, either expressed or implied, including but not
limited to implied warranties of program and accompanying documentation. In no event shall Clear Creek Solutions
and/or the Washington State Department of Ecology be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business interruption, and the like)
arising out of the use of, or inability to use this program even if Clear Creek Solutions or the Washington State
Department of Ecology has been advised of the possibility of such damages.
SECTION 9
MINIMUM REQUIREMENT #8
WETLANDS PROTECTION
Wiskerchen Residence
Technical Information Report
PROJECT OVERVIEW
There are no wetlands, wetland buffers, or critical areas on this site.
Wiskerchen Residence
Technical Information Report
SECTION 10
MINIMUM REQUIREMENT #9
OPERATION AND MAINTENANCE
Wiskerchen Residence
Technical Information Report
No. I — Detenfion Ponds
Allairdenance
Defect
Conditions When Maintenance Is
Results Expected When
C-ni—ent
Needed
Maintenance Is performed
General
Trash & Debris
Any bash and debris which exceed 5
Trash and debris cleared from site.
cubic fed per 1,000 square feet "
is about equal to the amount of trash
it-wauld take to fill up cine standard
soL garbage can). In general, there
should be no visual evidence of
dumping -
It less thari threshold all trash and
debris will be removed as part of next
scheduled maintenance.
Poisonous
Any poisanaus or nuisance
No dartger of poi— vegetation
Vegetation and
vegetation which may constitute a
wtiere maintenance personnel or the
noxious wimits
hazard to maintenance personnel or
public rrdght normally be. (Coardnate
the public.
with local health department)
Any evidence of noxious weeds as
Conplete eradication of noxious weeds
defined by State or kx:W regulations.
may not be possible. Compliance with
(Apply requitements of adopted PM
State or local eradication policies
required
policies for the use of herbicides)-
Ckiritarninants,
Any evidence of oil, gamine,
me
Mul Pollution
containinants or other pokitants
easkElimmair,
OF
(Coordinate removoydeanup with
pendmt7
pmest:
local vtzter quality response agency) -
Rodent 1-foles
Any evidence of rodent holes if
Rodents desbvjed and dam or berm
bcff4 is acting as a dam or berin, or
repaired- (C000rdiruile with local health
any evidence of vriter piping through
deparlinent; coordinate wilh Ecalogy
dorn or berm wa rodent holes
Dam Soldy Office if pond exceeds 10
acre -feel.)
No. I — Dehfton Ponds
U*,L.
I Dared
Candifians W. wirde.. Is
Results Expected When
CCU*--M
Needed
Mairiterumice Is Perfairmed
Beam Dams
Darn rem1b in change or furrction of
Facilifty is returned to desW function -
the facility.
(Coardinate trapping of beavers and
removal of dams with appropriate
penritfing agencies)
Insects
When insects such as wasps and
bmctB destroyed ar removed firm site.
homets interfere with maintenance
activities.
Apply insexAcides in compliance with
adopted IPM policies
Tree Grobith
Tree Towth does not allow
Trees do not hirider maintenance
and I-Iozard
mainteriancie access or Uftleres
activities. Harvested trees sluxitil be
Trees
with maintenance activity (i.e., slope
recycled into mulch or allw beneficial
nowing, silk removal, vactoring, or
uses (e.g, alders for firewoodli-
equipmentmavements)- If bees are
not interfering with access or
Remove hazard Trees
maintenance, do not remove
if dead, diseased, or dying trees are
identified
OJse a certified Artiond to deteartirie
health d tree or removal
I
requirements)
Side Slopes
Erosion
Eroded damage over 2 inches deep
Slopes dxxdd be stabilized usirV
off POW
%here cause of damage is still
appropriate erosion control measure(s);
pre, or where there is potential for
eg., rock rebrPorcement, planting at
continued erosion-
grass' C-Paction-
Any erosion observed on a
If enision is occurring on axnpacted
oompacted berm embankmenL
bemis a licensed dvd engineer should
be consulted bD resolve source of
erosion.
SWWe Area
Sedaverd
Acciumulated sectiment that exceeds
Sediment cleaned W to designed pond
10% of the designed pond cle"
shape and depth; pond reseeded if
unless oftierwise specified or affects
necessary to control erosion-
irdetting or outleffing condition of the
facility.
Liner Of
Liner is visible and has more than
Liner repaired ar replaced- Liner is fully
Applicable)
ftee 1144nch holes in it
covered.
Wiskerchen Residence
Technical Information Report
No. I — Detenlion Ponds
U.-&rIenance
Defect
Coriftons When Manitemice Is
Resxft EMected When
Comp"ierit
Needed
Makitenarme Is performed
Pland Be=
Settlements
Any pad d berm Wich has Settled 4
Dike is built back to the design
(Dikes)
lower than the design
elevation.
efevation.
U settlement is apparent, measure
berm to determine amount of
semement.
Set1mg can be an indication ot more
severe problem with the berm or
ouitlet works. A ficerised dd
enginieer should be consulted to
determine the source of the
seMement.
Rping
Discernabte water flow through pond
piping eliminated- Emsm potential
bes.. ChKjoh erosionwithpotential
reschred.
lor, �"r tocordbrue,
(Recommend a Goethechribcal
a*ieer be Called M to inspect and
evaluate, condffion and recommend
repair of conditim
Emergency
Tree Growth
Thee growth on emergency spillways;
Trees shiould be removed, ff mot
OvedoW
creates blockage problerns and may
system is smog (base tess thm 4
Spillway and
emm tailum of the berm dim to
inches) the rixit system may be Wft in
Bemis over 4
uncoritrolled overtopong,
ptu:e Otherwise the roots should be
ft%A in height
rerroved arid lhe berm resWredL A
Tree growth on berms over 4 fed in
licensed cid engineer stmild be
hexft may lead to piping through to
consulted for prow bermispiffway
berm which coudd bead to billife Of
restoration.
the berm
Pt*V
Discerimble water Gow through pond
PpM eliminated. Emsion poten�
bemv Origoing erosion w1i poteriltial
resolved,
bor erosion to 0011�
(Recommend a Goethechnicad
engiineerbe in to inspect and
evduate corridition and recommend
repair of condition.
Emergency
Emergency
Crdy one t3)w of mck exists above
Rocks orid pad depth are restored to,
OvedkW
Overlimid
native 9W in arm five square feet or
design stwidards.
SPD—Y
spftw
larger, or any exposure of native Sod
ad the top d out am Pam of Wiltway-
Oto-apon" " slopesneWriatbe
ROIaced)
&USion
see -side sopes, at Pond-
Wiskerchen Residence
Technical Information Report
No. 2 - hffiltrAon
Maintenance
component
Defect
Conditions Whw Maintenance Is
Needed
Resufts Expected When
Maintenancets
Perfonned
General
Trash & Detifis
See -Detention Pands" (No. I
See Metention Ponder
(NO. 11).
PowonousiNommits
See 13etwition Pander(No, 1).
See Metention Ponds"
Vegetefi-
(No- I)-
Contammants and
See Metentian Ponder (No. I
See"Detention Ponder
PGOLOM
(NO. I �
Rodent Holes
See Iketention PondEr (No. 1).
See Metention Ponder
(NO- 1)
Sturage Area
Sediment
Water ponding in ffffitiabon pond aftir
Sednwd is removed
rakitall ceases and appropriate time
sidlor facility is deaned
allowed for ird9hatimL
so that infiltration system
(A percolation test pit or ted of fadlifty
indi faality is ordy m" at 90% of
waft acatuding to
design.
its designed capabMies- If bw inches or
more sediment is pnmmrd, rerriwwe�
Mer Bags Cif
applicalde)
FRed aft
Sediment and
Debris
Sediinerd and debris IM bag imme than 112
M.
Hter bag is replaced or
system is redesigned.
Rock Fittem
Seclinent and
By v=W inspection, Me or no water flow
Gravel m, w* fiter ts,
Debris
through filter dumrtg heavy rain storins.
reptaCed-
Side Stopes of
Erosion
See -Detention Ponder (No- I
SeeDeterition Ponder
Pond
(No-Ily
Emogency
Tree GrovAh
See -DeWrttion Pander (No- 1)-
See Metention Pander
Ovefflon so"
(NIX IY
and Bemis over 4
fled in heiglit.
Piping
See -Detention PwxW (No- I
SeeDetentian Ponder
(NO. I) -
Emergency
RDck Missing
See -Detention PwKW (No. ly
See"Detention Pander
Ovafkyw SpMW
(NO. I Y
Erosion
See Metention Ponder (No- I
SeeDetention Ponder
(NO. 1).
Pre-setting
Ponds and Vaub
I
Facility or sump
filed with Sediment
Vor designed sedirnent MV depth of
sediment
I
Sediment is rernoved.
andkir debfis
Wiskerchen Residence
Technical Infoffnation Report
No. 5 — Catch Basins
maintenance
Defect
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is
performed
General
Trash&
Trash or debris which is located immediately
No Trash or debris located
Debris
in front of the catch basin opening oris
immediatetyinfroTdof
blocking inletting capacity of th e basin by
catch basin or on grate
morethan 10%.
openirq
Trash or debris (inthe basin)that exceeds 6D
No trash ordebris inthe
percent of the sump depth as measured from
catch basin.
the bottom of basin to invert of the lowest
pipe intooroutofthe basin, butin nocase
less than a minimum of six inchescleara=
from the debris surfaceto the invert of the
lowestpipe.
Trash or debris in anyintet or outlet pipe
In I et an d outl et pipes free
bl ocki ng in are th an 113 of its h ei ght.
of tras h or d ebris.
Dead animals orvegetatian that could
No dead animals or
generate odors thatcouldcause complaints
vegetation presentwithin
or dangerous gases(e.g,, methanel
thecatch basin.
Sediment
Sediment(inthe basin)that exceeds 60
No sediment in the catch
percent of the sump depth as measuredfrom
basin
thebottom of basinto invert of the lowest
pipe into orout of the basiR butin nocase
lessthan aminimum of6inches clearance
from the sedimerd surface to the invert of the
lowestpipe.
Structure
Darnageto
Topslabhas holes larger than 2 square
inches or cracks widerthan 1/4 inch
Top slabisfreeof holes
and cracks.
Frame an d10 r
Top Slab
(Intent is to make sure no material is running
into basin).
Frame not sitting flush onto p slab, i.e.,
separationof morethan3f4 inchoftheframe
from thetop slab. Frame not securely
attach ed
Frame is sittingflush an
the riser rings ortop slab
and firmly attached
Fractures a r
Cracks in
Basin Walfst
Maintenance p ersonjudges that structure is
unsound.
Basi n replaced or repai red
to d es i gn standards.
Bottom
Groutfillet hassepamted or cracked wider
Pipe is zraxau= and
than U2 inch and longer than I foot at the
secure at basin wall.
joint of any ird etfoutlet pipe orany evidence of
sail particles enteringeatch basin through
cracks.
Settlementl
If failure of basin has created a safety,
Basin replaced or repaired
Misalignment
function, ordesign problem.
to d esi gn standards.
Vegetation
Vegetation gro -wing across and bi ocking more
No vegetation blocking
than 10% of the basin opening.
openingto basin.
Vegetation growing in inlellotitlet pipejoints
that is more than sixinches tall and I essthan
sixinchesapart.
No vegetation or root
growth present.
Wiskerchen Residence
Technical Information Report
Maintenance
Defect
Condifionsifflheri Maintenanceis Needed
Results Expected When
Cornponent
Maintenance is
perfOrnied
Contamination
SeeDetention PonW(No. 1).
No pollution present.
and Pollutian
Catch Basin
CoverNotin
Coveris missing oronlypartially in place.
Catch bas�n coveris
Cover
Place
Any open catch basin requires maintenance.
closed
Locking
Mechanism canniatbeopened tryone
Mechanism opens Wth
Mechanism
maintenance person Wth propertoots. Bob
propertools.
NotWorking
into frame have lessthan W inch ofthread.
CoverDificult
One maintenance person cannot remove lid
Cover can be removed by
to Remove
after applying normal filling pressure.
one maintenance person.
(Intentis. keep cover from sealing offaccess
tD maintenance.)
Ladder
LadderRungs
Ladderis unsaledueto missing rungs� not
Ladder meets design
Unsafe
securely aftachedtD basin vAMI,
standardsandallows
misalignment, rust, cracks, orsharpedges,
maintenance person safe
access.
Metal Grates
Grateopening
Grate Wth opening vAderthan7/8 inch.
Grate opening meets
-W
Unsafe
designstandards,
Trash and
Trash and debristh at is blocking m are than
Grate fteeoftrash and
Debris
20r% o I'grate surface j&tMUcapacity.
debris.
Damagedor
Grate missing or broken member(s)ofthe
Gmteiz in place an d
Miss�ng.
grate.
meets cles� gnstandds,
Wiskerchen Residence
Technical Infonnation Report
SECTION 11
MINIMUM REQUIREMENT #10
OFFSITE ANALYSIS AND MITIGATION
Wiskerchen Residence
Technical Information Report
PROJECT OVERVIEW
Per design, there are no expected conveyance capacity or erosion potential issues anticipated as a result
of this project.
Wiskerchen Residence
Technical Information Report
SECTION 12
SPECIAL REPORTS AND STUDIES
Wiskerchen Residence
Technical Information Report
APPENDIX 12-A
GEOTECHNICAL REPORT
Wiskerchen Residence
Technical Information Report
LIU & ASSOCIATES, INC.
Geotechnical ln�fneen'ng Engineering Geology
August 5, 2013
Mr. John Wiskerchen
1!
16531 Broadwav Avenue
Snohomis WA 98296
Dear Mr.Wiskerchen:
Subject: Onsite Stormwater Disposal
Wiskerchen-Prost Residence
1645 — 9h Avenue North
'Ednioncls, Washington
I L&A Job No. 12-069
INTRODUCTION
Eaft S�nce
We previ, usly completed a preliminary geotechnical investigation for the development 0
the subje t residence, with our finding of the site conditions and preliminary geotech.nicE
recorrim . idations presented in a report titled "Preliminary Geotechnical Investigatior
Single-Fi I : mily Residence Building Lot, 645 _ 91h Avenue North, Edmonds, Washington,
dated JuN 15, 2012. We understand that onsite disposal of stormwater by infiltration i
planned tor the development of the subject residence. At your request we have comp]
two in-sl!tu infiltration tests on the south and east sides of the site to determine
11
i9n rate for design of infiltration trenches to be used for onsite
disposal.1i Presented in this report are description of test rocedure, test results and
I P
recorrund ! ndations.of design infiltration rate.
19213 Kenlake Place NE - Kenmore, Washington 98028
Phone (426) 483-9134 - Fax (426) 486-2746
August 5,:2013
Onsite St water Disposal
Wiskerchen Residence
L&A Job No. 12-069
Page 2 1
REVIEW OF SUBSURFACE CONDITIONS
The subsurface conditions of the site had been explored previously and were presented in
our 7/1512012 report. The test pits excavated on the site encountered a medium -dense to
dense Esperance sand deposit of light-brmn to gray, fine to coarse sand, containing trace
to some gravel, with, the surface of this deposit at about 4.0 to 5.0 feet below existing
grade. Overlying the;Esperdnee sand deposits are layers of weathered silty fine sand soil,
topsoil, a d near the top of slope on the west side of the site some fil.l. Groundwater was
not encoLntered by the test pits. The clean Esperance sand deposit appears to be of high
permeabi ity and should be capable of supporting onsite stormwater proposal by
infiltration.
INFILTRATION TEST LOCATIONS AND SOIL CONDITION
We performed two in -situ infiltration tests on July 31, 2013. The locations of I
irifiltratic n tests, IT- and IT-2, are shown on Plate 2 attached hereto. The soil conditi
at these locations is consisted of about 12 inches of topsoil, underlain by a layer of bro,
to light-�roivn weathered soil of silt-
y fine sand with trace gravel, about 1.5 to 2.0 f
thick. This soil layer was underlain to the bottom of the test pits by deposit of gray, di
fine to medium sand'with trace to some gravel, which appears to be of an Esperance
soil unit This Esperance Sand deposit is also the target soil layer in which
infiltrafign tests were conducted. Groundwater was not encountered by the test pits.
LIU & ASSOCIATES, INC.
August 5,12013
Ohsite Stormwater Disposal
Wiskerchtn Residende
L&A Job 0. 12-069
Page 3
INFILTRATION TEST PROCEDURE
The in-sit'u infiltration tests we conducted for this project were carried out in acco
with thel procedure', outlined in Washington State Department of Ecology
For each test location a Pi
about 10 ieet by 10 feet by about 2.0 to 2.5 feet deep was first excavated out. A smallei
pit about 2.0 to 2.5 feet deep was then excavated out in the middle of the larger pit ir
which the, tests were Londucted. The inner smaller pit was measured for dimensions of it5
bottom area, then fililed with water for hours until the amount of water infiltrating intc
bottom of the pit reached a steady state (i.e., the volume of water infiltrating into tht
ground through bottom of the pit was the same as volume of water discharged into the bi,
while water in the pit was kept at a constant level) for at least an hour. Clear tap watel
was used in the tests. The infiltration rates into the inner smaller pits were ther
determined by the constant head method with the volume of water discharged into the pi
measured with a flow meter attached to the hose conveying water from the faucet into th(
pit for a period of 30 minutes. The volume of water discharged into the test pit during thi
30-minute period was measured in U.S. gallons. The. volume of water was then converte(
into cubic feet and divided by the bottom area of the test pit to derive the infiltration rati
in inches per hour (iph). A correction factor of 4.0 is used to come up with the desigi
infiltration rate of the Esperance Sand soil. The test results of the tow infiltration tests an
presented as follows,-
LIU & ASSOCIATES� INC.
0 1 t
August 5, 2013
Onsite ' Stormwater Disposal
Wiskerchen/Trost Residence
L&A Job No. 12-069
Page 4
Volume. of Water into Test
Elapsed
Infiltration
* Design
Test
Pit
Test Pit
Time
Rate
Infiltration
Bottom
No.
Gallons
Cubic Feet
Hour
iph
Rate, i ph
Area
IT-1
134.00
17.9
4f.0n x 31-10"
0.5
28.0
7.0
IT-2
113.00
15.1
4'.0' x 3'-9"
0.5
* With a correction factor of 4.0.
CONCLUSION AND RECOMMENDATIONS
Design Infiltration Rate
The design infiltration rate of the Esperance Sand deposit underlyin the site, with a
. 9
correction factor of 4.0. was determined from the in -situ infiltration test results to be at
least 6.0 iph. We recommend a design infiltration rate not to exceed 4.0 iph be used
design of the infiltration trenches to be constructed on the east and south sides of
house.
Infiftration Trench Construction
The trenches should be cut at least 6 inches into the underlying Esperance Sand deposit ol
clean, gray, fine to coarse sand with gravel and silt and/or gray fine to medium sand witf,
trace gravel. To reach the target Esperance Sand deposit the infiltration trenches woulc
have to be excavated to 5 feet deep or more. The soil unit at bottom of infiltratior
trenches should be verified by a geotechnical engineer. The stability of the trench cu
banks should also be verified by a geotechnical engineer during, excavation. Cut banks it
LIU & ASSOCIATES9INC.
0 . 0
August 5, 2013
Onsite Stormwater Disposal
Wiskerchen/Trost Residence
L&A Job No. 12-069
Page 5
the topsoil and weathered soi I should be no steeper than I H: I V to maintain stability an
to prevent sloughing into bottom of the trenches to contaminate the clean Esperance san
soil. The infiltration trenches should be set back at least 5 feet from property lines, 1
feet from nearby building foundations or utility trenches, and as far away as possible froi
the top of slope and rockery on the west side of the site. Also, the bottom of infiltratic
trenches should be no higher than the adjacent footing foundations.
Our recommendations for construction of infiltration trenches with single dispersion pir
is shown on Plate 3. I -he infiltration trenches should be 4 feet wide minimum. The sid
walls of the trenches should be lined with a layer of non -woven filter fabric, such E
MTRAFI 140N S. The trenches are then -filled with clean washed 3/4 to 1- 1/2 inch washc
gravel or crushed rock to within about 10 inches of the finish grade. The gravel (
crushed used to fill the trenches should not be coated with mud or other substances whic
may clog up bottom of the trenches. The dispersion pipes should be constructed of 6-inc
rigid PVC pipes and laid level in the gravel or crushed rock filled trenches at about I
inches below top of the trenches. The top of the gravel or crushed rock fill should also 1:
covered with the filter fabric liner. The remaining trenches should then be backfilled wil
compacted onsite clean sand soil.
The gravel or crushed rock fill should be placed in lifts no more than 10 inches thick i
loose state, with each lift compacted to a non -yielding state with a vibratory mechanic,
compactor. The compaction and densification of trench fill is critical if it is to support th
joint -use drivewa),. Stomiwater captured over the paved driveway should be routed into
LtU & ASSOCIATES9 INC.
0 ,
August 5, 2013
Onsite Stormwater Disposal
Wiskerchen/Trost Residence
L&A Job No. 12-069
Page 6
catch basin equipped with an oil -water separator before being released into the infiltration
trenches.
LIMITATIONS
This report has been prepared for the specific application to this project for the exclusive
use by Mr. and Mrs. Wiskerchen and their representatives, consultants and contractors.
The conclusions and interpretations in this report, however, should not be construed as a
warranty of the subsurface conditions. "Ibe scope of this report docs not include services
related to construction safety precautions and our recommendations are not intended to
direct the contractor's methods, techniques, sequences or pr6cedures, except as
specifically described in this report for design considerations.
Our. recommendations and conclusion are based on the geologic and soil conditi
encountered by the'test pits excavated on the site initially and by the infiltration test
our experience and engineering judgment, and the infiltration test results.
conclusions and recommendations are professional opinions derived in a m,,
consistent with the level of care and skill ordinarily exercised by other members of
profession currently practicing under similar conditions in this area. No warranty,
expressed or implied, is made.
The actual subsurface conditions of the site may vary from those described in this and
7/15/2012 preliminary geotechnical report and encountered by the infiltration test pits
LIU & ASSOCIATES, INC.
August 5, 2013
Onsite Ston-nwater Disposal
Wiskerchen/Trost Residence
L&A Job No. 12-069
Page 7
The nature and extent of such variations may not become evident until construction star
If variations appear then, we should be retained to re-evaluate the recommendations
this report, and to verify or modify them in writing prior to proceeding further with t
construction, of the proposed development. A copy of this report should be provided
the Contractor of infiltration trenches for, compliance with the recommendations in tf
report. Construction of infiltration trenches should be observed and monitored by
geotechnical engineer.
CLOSURE
We are pleased to be of service to you on. this project. Please feel free to contact us if
have any questions regarding this report or need further consultation.
Plates 2 and 3 attached.
M,
Yo��,very truly,
�AJ & SSOCI S. INC.
J. S. ((J Plian) Liu, Ph.D., P.E.
Consulting Geotechnical Engineer
4S 145 1-20 1 -5
LIU & ASSOCIATES,. INC.
tq , I ;,
a
6 -3 -Z
cv-
-z
-,:�k
x
A\
5.
Al
0
vlo
CL 6
CL
a
-�Ql
0.
;411% ol
, 0 14 a
ori
-2 Ott
MDR
LRT & ASSOCUTES, INC.
Geotechnical Enginecring, Enginming Gcoloa Eanh SLmm%:e
> o� C�-
INFILTRATION TRENCH TYPICAL SECTIO
WISKERCHEN/TROST RESIDENCE
645 - 9TH AVENUE NORTH
EDMONDS, WASHINGTON
3:NO. 12-069 DATE 81SJ2013 1 PL
TE
C3
.90 -19,4
Citybf Edniofids",
Critic -al Areas... the'"c'k, list-.
The Critical Areas Checklist contained on and submit it to the City. The City will
this form is to be filled out by any person review the checklist, make a precursory site
preparing a Development Permit visit, and make a determination of the
Application for the City of Edmondsprior subsequent steps necessary to complete a
to his/her submittal of a development development permit application -
permit to the City.
X:
With a signed copy of this form, the
M6 putp6ge of the Checklist is to enable -
applicant should also submit a vicinity map
C4ty -nike whether any
n to deter
or plot plan for individual lots of the parcel
Ile
poteniia4 Critical Areas'are or Tay be
with enough detail that City staff can find
subject property. Ile
and identify the subject parcei(s). In
inf6iinaii6n needed to complete the
addition, the applicant shall include
'other
Che6kIiit should be easily available from
pertinent information (eg. site
observitions of the site or data available at
plan, topography map, etc.) or studies in
Hall (Critical Areas inventories, maps,
conjunction with this Cheddist to assist
;,.—City
-or soil surveys).
staff in completing their preliminary
=33caamunt U& U11: Nitce
An applicant, or his/her repres6tative,,'....-
must fill out the checklistj signand datedt,2,!��f�
I have completed the attached Critical Area Checklist and attest that the answers provided are
'to"ihibm"I'of-mim
out the appropriate column
li�; Reptesen-
Owner Applicant:-'� tative:
Name
2, -
Street Addrew tStreet Add=
:11 Vi 7
�,0007_ '15
city, state, ZIP City. State, Z
_,Phone'; Phone
"""Date
Signa ate S (66 -
CA FWO.
01tical Areas Checklist
�Site Information (soils/topography/hydr logy/vegetation)
A-Zi
1. Site Address/Location: 6- 5;" -5- — 1'9,
2. Property Tax Account Number: -V ZO
3. Approximate Site Size (acres or square feet): n1le, I-eo-r
4� Is this site currently developed? _yes;
no. 2
If yes; how is site developed?
5. Describe the general site topography -Check all that apply.
Flat: less than 5-feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise, of 10-feet over a
horizontal distance of 66-feet).
Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise
of 10-feet over a horizontal distance of 33 to 66-feet).
Steep: grades of greater than 30% present on site (a vertical rise of 10-
horizontal distance of less than 33-feet). I *no"
Other (please describe):
6. Site contains areas of year-round standing water: Approx. Depth:
7. . Site contains areas of seasonal stand RECEIVED
ing water Approx. Depth:
What season(s) of the year? MAR 2 1 1995
8. Site is in the floodway floodplain of a water course. PERW COUNER
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round? Flows are seasonal? (What time of year?.
10. Site is primarily: forested A --J ;meadow _;shrubs mixed
urban landscaped (lawn,shrubs etc)
c;2
11. Obvious wedand is present on site: ?,/,6
IC4 W
Rev6IM094
7"7' EXHIBIT "All'
Q
40,EeO�� 7-0 7741E-C17"Y
IVE-- CORI, -1,09 0,-'- 72V,6-
,5/,-
,5: 0:;�
IF14SIE'"le �v 7-
A/00* 0,6 ",9 7 "W
/0
APPROVAL OF THIS SHORT
SUBDIVI'SION IS SUBJECT
TO THE CONDITIONS FOUND
IN CITY OF EDMONDS
FILE #S-26-81.
4042602-26
A.
A100*1Z'00"'ln
/.110-040 07
/VOOO,50-
/4000,5yo
Its.
IN,
'goc—e
It Ill.-71 &S
/V000 06,137"Al
1-07- Z-11VAT
-3
29j 9 71 S? Ic-6
1A101CA 72F-�5
,5E'7-,6AC1<'
//4f.
1711,3
7-),' eEZ5" 77
0
CITY CLERK,
QviA Gemfe,
Washjngto,�
—71
-,01VIS10,A1 Oc- 7-1-11,5 AWO,
7- 7-0 77/Z
CO,V,01 7-10A1,5 --5---7-,zVdF7
1AIC17-),- Oc- E-,0A-A0A10-5
Oc- 511-10,e7-
'IN
0 41sl aEl
7A-'.-- W"
Or e65 77
04.2
%
00
z
0
0
u
--S" 7-
A10- (61-104
A-100 0 06',-0 7 *",W
PAGE 1 OF 3
LEM DESCRIPTIONS S-26-81 -CITY CLERX
lqw FOR Civic Center
WILLIAM KASPER rdmonds, Washington
THE SOUTH IIALF Or THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 24, TOWNSHIP 27 NORTH.- RANGE 3 EAST, W.m..,
EY,CF,Pr THE SOUT11 220,00 FEET THEREOF,, AND
EXCEPT THAT PORTION CONVEYED TO THE CITY OF`EDl101JDS BY DEED RECORDED UNDER
AUDITORIS FILE NO. 21118900 IN VOLUPIE 348 Or, OFFICIAL RECORDS, PAGE 384s
RECORDS OF SllOHO!,aSH COUNTY, WASHINGTON.
SUBJECT TO EASEMENTS., RESTRICTIONS AND RESERVATIONS OF RECORD.
.LOT 1:
THE FAST 132sOO FELT OF THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE
SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SECTION 249 TOWNSHIP 27 NORTH)
RANGE 3 IIST3 W.M., MORE PARTICULARLY DESCRIBED AS FOLLOWS:
Z
Lu
Z 6
Z
U- w
0
>- CL
L) a u
<
LLJ
a: LLI 0:
C0101ENCING AT THE NORTHEAST CORNER OF THE SOUTH HALF OF THE SOUTHEAST QUARTER
OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SAID SECTION 242 THENCE-
N-89%5'12"WEST� ALONG THE NORTH LINE OF THE SOUTH IIALF OF THE SOUTHEAST QUARTER
OF THE SOUTHEAST QUARTER OF.THE NORTHWEST QUARTER OF SAID SIXTION 24 FOR 9*00 FELT
TO THE TRITE, POINT OF BEGINNING-
.9 THENCE CONTINUING ALONG SAID NORTH LINE,
N. 8�045'12"Ws--1194OQFEET; THENCE. S. 0*12"eE., 19'050 FEET; VENCE S 89v45'12'/E.
PARALLET WITH THE NURTH LINE OF'SAID SOUTH HALF 3.50 FZET; THENCE S. 56"25"lo"W.,$)
8.98 r.=,, )'MORE OR LESS, TO AN INTERSECTION OF A LINE WHICH IS 132*00 Fl-A,,ff �rfST
OF SAID EAS.T LINE OF SAID SOUTH HALF; THENCE S. e12 .00*E.., PARALLEL WITH SAID
EAST LINE, 89.32 "FET7. MORE OR LESS., TO THE NORTH LINE OF THE SOUTH 220.00 FELT
bF THE SOUTH IIALF OF THE SOUTHEAST.QUARTER OF THE SOUTHEAST QUARTER OF THE
NORTHI-IEST QUARTER OF SAID SECTION 24;' THENCE S-8947`16*E.j, ALOTIG THE NORTH
LINE OF SAID SOUTH 220,00 FEET3 121.00 FEET., MORE OR LESS., TO THE IMST LINE,
OF THAT PORTION CONVEYE P TO -T'lE ciTy OF EDMONDS 'BY DEED RECORT ED M
FILE 110. 2111890 ), UND, AUDITOR'S
,0 IN VOLME 348 OF OFFICIAL RECORDS, PAGE 384 REPORDS OF
SNOHOKESH COUN"j"l, �AASHINGTON; THE14CE N. 0*50.`3eE., 113.75 F6.T3 �11ORE OR LESS
TO THE TRUE POTNT OF BEGIIINING.
SUBJECT * TO AN EASD4ENT FOR INGRESS AIM EGRESS OVER THE SOUTH 15,100 FEET OF
THE NORTH 19-50 FEET OF THE."tMVE DESCRIBED PARCEL,, AND.9
SUBJECT TO AN EASEMENT FOR.THE INSTALLATION , OPERATION AND MA114TRIANCE OF
A WATER LINE OVER., ACROSS2 THROUGH., UNDER AND UPON THE FOLLOWING DESCRIBED PROPERTY:
SAID EASE1,04T TO 13E 5*00 FEET IN WIDTH, 2.50 FEET ON EACH SIDE OF THE F011CWIllG
DESCRIBED CENTERLINE: A LINE 7.00 FEET NORTH OF AND PARALLEL TO THE SOUTHERLY
BOUNDARY OF THE NORTH 110.00 FELT OF THE SOUTH HALF OF THE SOUTHEAST QUARTER
OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SECTION 242 TOWNSHIP 27 NORTH,
RANGE 3 FAST, W.M. FOR A DISTANCE OF 180,00 FEET, THEN AT.A SOUTHWESTERLY A14GLE
TO THE SOUTHERLY PROPERTY LINE AT A POINT 203.00 FEET FROM THE EAST 'W*kZED
RECORDED UNDER AUDITOR'S FILE NO. 2044321. At
FOR
SUBJECT TO EASEMENTS3 RESTRICTIONS AND RESERVATIONS OF RECORD. RECORDING
CITY OF EDMONDS
LOT 2 By
Page Of 4e,
THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF THE NORTH�JFST
QUARTER OF SECTION 240 TOWNSHIP 27 NORTHP RA14GE 3 EAST) W.m.s
I-'ICEPT THE SOUTH 220,00 FEET THEREOF., AND -
EXCEPT THE WEST 4-U.,99 FEC., AM 8404260226
EXCEPT THE FOLLOWING DESCRIBED PARCELi
LD
-m
C014MENCING AT THE NORTHEAST CORNER OF- THE SOUTH HALF OF. THE SOUTHEAST QUARTER
OF THE, SOUTHEAST QUARTER OF THE NORTHWEST QUARTER or, SEUiION 240 TOWNSHIP 27 NORTH$
RANGE 3 EAST, W.M.; THENCE N. W45`lt W-9 ALONG THE NORTH LINE OF SAID SOUTH 00
HALF 9.00 FEET TO T
�E YRUE POINT OF BEGINNING; THENCE CONTINUING ALONG SAID
NORTH E N. 89P45 lfw, '119.00 FEET; THENCE S. OP12"00" 19.50 FEET; THENCE
S. 8q'04L5Ip12l'E.., PARALLEL ' WITH THE NORTH LINE OF SAID SOUTH HALF 3.5c) F BET;
TH04CE s. 56*25"10*w.., 8.98 FEET,, MORE OR LESS TO AN INTERSECTION OF A LIINE
WHICH IS 132,00 FEET WEST. OF.THE: EAST LINE OF SAID SOUTH IIALF; T11ENCE S. el2`oo`r.,.,
PARALLEL WITH SAID TAST LINE -' . 89,32 FEET) MORE OR LESS, TO THE NORTH LI14E OF ....... *900
(7)171T) PA7, 2 .....
EXHIBIT "B" CITY CLERK
I
LEGAL4RSCRIPTIONS S-26-81 CIVIC center
CONT ID. Edmonds, Washington
LOT 2 (CONT IID)
THE SOUTH.220.00 FP.Er OF THE SOUTH HALF OF THE SOUTHEAST QUARTER OF TTTE
SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SAID SECTION 24; THENCE
s. W47-*IeE., ALONG THE NORTH LINE OF SAID SOUTH 220.00 FEETO 121.00 FEET.,
MDRE OR LESS , TO THE WEST LINE OF THAT PORTION CONVEYED To ZTE CITY OF
EDMONDS BY DEED RECORDED UNDER AUDITOR'S FILE NO. 2111890., IN VOLUME 348
OF OFFICIAL RECORDS., PAGE 384j RECORDS OF SNOHOMISH COUNTY., WASHINGTON;
THENCE N, Oc-'50'30�E.x 113.75 FEET, 1-10RE OR LESS, TO THE TRUE POINT OFBEGINNING*
TOGETHER WITH AN EASEMENT FOR INGRESSoEGRESS AND UTILITIES OVER THE SOUTH 15,00 FEET OF
THE NORTH 19*50 FEET OF THE YCLWTING DESCRIBED PARCE11
COMIIENCING AT THE NORTHEAST CORNER OF THE SQ?"H'HALF OF THE SOUTHEAST- QUARTER Ol� THE
'SECTION 24; THENCE N 0
SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF:SAID. .89 45 12- W.)
ALONG TlrE NORTH LINE OF THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST
QUARTER OF THE 14ORTHWEST QUARTER OF sAn SECTION 24 FOR goo FEEr TO THE TRUE
POINT OF BEGIIINING' r_71ENCE CONT=NG ALONG SAID NORTH = N. 89*45'12*w.,,
119*00 FEET; TH1110E S. 0 0 22: If 11 E.2 19,50 FEEtj THENCE S. 89'45'12*Eos PARA=
W�ITH THE NORTH LINE OF SAID SOUTH HALF 3.50 FELT; THENCE s. 56*25'lew,,
8.98 FEET 14ORE OR LESS., TO AN INTERSECTION OF A LINE WHICH IS 132.00 FEET WEST
OF SAID EAST LINE -OF SAID SOUTH IWFj THENCE S. 0012'06'E., PARALLEL wrm SAID
EAST LIM., 89,j32 - 'FEEr MORE OR LESS, TO THE NORTH LINE OF THE SOUTH 220900 FEEr
OF THE SOUTH RALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF THE
NORTHWEST QUARTER OF SAID SECTION 24; THENCE S. 89%7'16*E., ALONG THE NORTH
LINE OF SAID SOUTH 220*00 FEET, 121,00 FEET MORE OR LESS, TO THE WEST LINE OF
THAT PORTION CONVEYED TO THE CttY OF EDMONDS BY DEED RECORDED UNDER ATTDITORIS
FILE NO.2LI18900 IN VOLU111E 348 QF &FIC M' RECORDS, PA:GE 384.9 RECORDS OF SNOHOMISH
COUNTY., WASHINGTON; THENCE N. 0 50'3eE..q 3.13.75 FEErj MORE OR LESS T0 THE
TRUE POINT OF BEGINNINGI,.AND
TOGETHER WITH AND SUBJECT TO AN EA9EMENT FOR THE INSTALLILTION, OPERATION
A!TD MAINTENANCE OF A WATER LINE OVER., ACROSS., THROUGH., UNDER AND UPON THE,
FOLLDTING DESCRIBED PROPERTY: SAID EASEIE14T TO BE 5,00 FEET IN WIDTH� 2.50 FEET
ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: A LINE 7*00 FEET NORTH
OF AIM PARALLEL TO THE SOUTHERLY BOUNDARY OF THE NORTH 1lOoO0 FEIW OF THE
SOUTH HALF OF '-plitOUTHEAST QUARTER -OF THE SOUTHEAST QUARTER"z:OF THE NORTHWEST
QUARTIR OF SECTION 24,9 T014NSHIP 27. NORTH., RANGE 3 EAST, W.M.., FOR A DISTfidlCE
OF 180.00 FEET, THEN AT A SOUTHWESTERLY ANGLE TO THE SOUTHERLY PROPFRTY LINE
AT A POINT 203,00 FEET FROM THE EAST BOUNDARY., RE)CORDED UNDER AUDITOR'S FILE
NO. 2044321,
_��T TO -AN E-A 7SEVENT-f O-R—fff fZT-129-167-Eff N V= 0vEfft._bfflR__A_N_D_lMWMM -
FOLLO�rBG DESCRIBED PARCELt COM)MNCVG AT THE NORTHEAST WINER OF THE SOUTH HAW OF
THE SOUTHEA.ST QUARTER Of THE SOUTHEAST QUARTER OF THE NffnUEST QUARTER OF SAM
SECTION 24; THEVICE N.89 45'3k"W.jj ALONG THE NORTH LINE OF THE SOUTH HALF OF THE
SOUTHEAST QUARTER OF THE SOUrHEAST QUARTER OF THE NORTHWEST QUARTER OF SAID
SECTION 24 FOR 349,46 FEET TO THE TRUE POINT OF BEGINNING) THENCE CONTINUE N.89%5'12%
ALONG SAID NORTH LINE 10,54 FEETJ THENCE N.6006'37"W., PARALLEL WITH THE WEST LINE
OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SAID
SECTION 24 A DISTANCE OF 153,84 FFMV VIORE-OR LESSq TO THE SOUTH LINE OF THE
NORTH 180.00 FEET OF THE NORTH HALF OF THE SOUTH ' EAST QUARTER OF THE SOUTHEAST QUART'ER
OF THE NORTHWEST QUARTER OF SAID SECTION 24; THENCE S.89%3'O84*E.So ALONG SAID SOUTH
LINE 10.54 FELT; THENCE S.Cf 06'374*E.p PARALLEL WITH THE WEST LINE OF THE SOUTHEAST
QUARTER OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SAID SEICTION 24; A
DISTANCE OF 153.83 FEET., MORE OR LESSA, TO THE TRUE POINT OF BEGINNING.
SUBJECT TO EASEVENTS2 RESTRICTIONS AND RESERVATIONS OF RECORD.
AUTHORIZED
FOR
RECORDING
CITY OF EDMONDS
By
Page Of 1�0
8404260226
CITY OF EDMOND9
P. W. DEPT. ENGINEERING DIV,
.EXAMINED
BY' DATEJ
REMARK
VOL 1840PAGE 19""7
I'll
EXHIBIT "B"
CITY r- _-RK
'PAGE 3 OF 3
AP.THORIZED
CiViC L er
Edr"Onds,
FOR
Washington* CITY OF EDMONDS
P.W.- DEPT. ENGINEERING DW
RECORDING
EXAMINED
CITY OF EDMONDS
LEOAL DESCRIPT ONS S-26-81
BY
�y
(CONT ID)
Page 'eo' of
TZ I
THE EASTERLY 2621,99 FEET
OF THE WESTERLY 4.12.99
FlOr OF THE
SOUTH HALF OF THE
SOUTHEAST QUARTER OF THE
SOUTHEAST QUARTER OF THE
NORTHWEST
QUARTER OF SECTION 24
TOWNSHIP 27 NORTH, RANGE
3 EAST., W-M-
EXCEPT THE SOUTH 220*00
FEET THEREOF,
TOGETHER WITH A DRAINAGE EASEMT OVER AND UNDER THE EAST 125eOO FEIr OF THE
NORTH 10.00 FEET OF THE WEST 150-00 FEET OF THE SOUTH HALF OF THE SOUTHEAST
QUARTER OF THE SOUTHEAST QUARTER OF THE NORTHWEST QUARTER OF SECTION 24.,
TOWNSHIP 27 NORTH, ROOF, 3 EAST9 W-149., AND9
TOGETHER WITH AN EASMIENT FOR.INGRESS, EGRESS AND UTILITIES OVER, UNDER AND ACROSS
THE FOLLO14ING DESCRIFM PARCE14 SAID EASROU TO BE 30.00 FEET IN WIDTH,
FIFTEEN (15) FEET ON EACH OF THE FOLLOWING DESCRIBED CENTERLINE:
CO�VMTCING AT'THE NORTHFMT CCMIER OF THE SOUTH HALF OF THE SOUTHEAST. QUARTER OF THE
SOUTHEAST'QUA.RTEB-.QF THE NORTHWEST. QUARTER OF SECTION 24p TOWNSHIP 27 NORTH,RXiGE 3 EAST.,
W.1 ALONG THE NORTH LINE OF LAID SOUTH HAL]Fj, 341.83 FE& TO
THE TRug POINT bF. BEGIZINING; THENCE N. - (f 19. 48Y E.9 153,05 FE IT.. 1,1ORE OR IM S., TO THE
SO'JTH IZNE OF THE NORTH 180.00 FEEr OP.THE NORTH HALF OF THE SOUTIMLST .40ARTER OF THE
SOUTHEAST QUARTER OF THE NORTh1r1EST QUARTER 6`F SA.ID SECTION 24, AND THE TER14INUS OF
SAID LINE DESCRIPTION.
SUBJECT TO EASE14ENTSq RESTRICTIONS AND RESERVATIONS OF RECORD.
LOT 4:
THE WEST 150-00 FEET OF THE SOUTH HALF OF THE SOUTHEAST QUARTER OF THE SOUTHEAST
QUARTER OF THE NORTHWEST QUARTER OF SECTION 24., T11,111SHIP 2-7 NORTH.9 RANGE 3 EAST,,W.M.1
EXCEPT TH&*SOUM 220,00 FEIT THEREOF.
TOGETHER WITH AN EASEMENT FOR INGRESS AND EMESS OVER THE WEST 20,00 FUT OF THE
NORTH I ' 10.00 FEET OF THE SOUTH 220.00 FELT OF THE SOUTH HALF OF THE SOUTHEAST QUARTER
OF THE SOUTHEAST QUARTER OF THE NORTMMST QUARTER OF SECTION 24,9 TMRITSHIP 27 NORTIi.,
RANGE 3 EkST,, W.M.. . UNDER AUDITOR IS FILE NO. 8109010203 9 -AND.,
SUBJECT TO AN EASEIWT FOR DRAINAGE OVER AND Ul',MER THE EAST 3.25,00 FEM Or, THE
NORTH 10,00 FEET OF THE WEST 150,00 = OF T9E SOUTH HALF OF THE SOUTHEAST QUARTER
OF THE SOUTHEAST QUARTER OF THE NORTIDTEST QUARTER OF SECTION 2,4 TMINSHIP 27 NIORTH.9
UINGE 3 EAST, W.M.S ANDS
SUBJECT TO AN EASM1ENT FOR. IN
ILITIES OVER., UNDER AND ACROSS THE WEST 50-00 FEET
OF THE ABOVE DESCRIBED PARCEL RECORDED UNDER AUDITORIS FILE NO. 81o8o40269.
SUBJECT TO FASEIMNTSS, RESTRICTIONS AND RESERVATIONS OF RECORD.
William J. asper, i i vXi dual
Adelaide C. Hofto
L. I 01P
0*"' William J. Kasper
;A
attorney in fact
SAO.
0
:
' �Pv
0'�'q C.,
p 0� i
�_ N1
VOL 1840PAGE 1963
0
STATE OF WASHINGTON,
SS.
�Ountyl-��'I��",.'%,
day of 4��C-
is 19d��, before me personally appeared
to me known to be the individual described in and who executed
thi Jor for self and also as Attorney in fact for
9 In.
, i &ak, owfe4
tn jhat:-. he signed and sealed the same as 11'r free and voluntary act and deed for 17' 7
..,.'self and dls6 free and voluntary act and deed as Attorney in Fact for said principal" for the uses and
torney authorizing the execution of this instrument
pt#pQSf s$ ein men ned, and on oath stated that the Power of At
U
bas.not b ""' ked'and that the said principal is now living and is not insane.
oft revo
Given under my hand and official seal the day and year lVe written.
C
... .............................. . .... ..... ..
84.04260226 ............... ..... ......... ........ .........
ACKNOWLEDGMENT Notary Public in
INDIVIDUAL AND AS'ATTORNEY IN FACT. residing at 41e"& Q.V%A.46-
_,(nd for the State of Washington,
n4%
VOL 1840 PAGIDUU
I if
!f:-Wl I
ALOHA
SECTION 24,T�'271%1,14.3E,W.M.
CITY OF EOMONOS
SNOHOMISH COUNTY,WASHINGTON
o.Eoir.-ATJciN APPROVALS 'l-A-CKNOWLEOGEMENTS
KNOW ALL -MEN BY "THESE PRESENTS fTHAT WE THR. UNDERSIGNED, EXAMINED AND APPROVED THIS DAY OF 1987.,. STATE'OF WASHINGTON)
OWNERS Ili FEE j;IMPLE_-AfD MORTbAQEE-.OF--W[E LXVD HEREBY SS.
PLATTED, 90_HEREBY-DEftARE THIS-PL7LT ANf) DEDICATE Td--THE USE COUNTY. OF_§Aok..,'.h)
OF THE PUBLIC FOREVER, AV�6!fREFS§ AND EASEMMS ' OR- 44RATEVER
PUBLIC PROPEiTY--TfTERr_iS SHOVk ON THIS PDkT AkD._THE-VSE am AITY ENGINEER ON THIS __j?_n4___DAY OF APRIL, 1987, BEFORE HE PERSONALLY
THEREOF FOR ANY AND ALT
,.PCbLIC PLTVOSmk*, :A1;Sb_THf RIGHT'TQ APPEARED MARK A. McNAUGHTON AND MARTIN J. SPADAFORA, TO ME
MAKE ALL NECESSARY SMPES FOR LgUft OR FILLS UPON THE LOT.T-. EXAMINED AND APPROVED THIS' 3 DAY OF t\ %IAIW 1987. KNOWN TO BE THE PRESIDENT AND SECRETARY, RESPECTIVELY, OF
AND TRACTS SHOWN HFkEON, j1+-'fHE REASORNBLE GRADIW'6FL�.Ak];,_-% HOMELAND HOMES, INC., THE CORPORATION THAT EXECUTED THE
STREETS SHOWN HEREON, ALSd THE RIGHT'trF ACCESS OVER�THE LOTS FOREGOING INSTRUMENT, AND ACKNOWLEDGED THE SAID INSTRUMENT
TO THE UTILITY EASEMENTS AS - )CNY TIMV.- ONAAA JLtW_bjkJZJ TO BE THE FREE AND VOLUNTARY ACT AND DEED OF SAID
PURPOSES. EDMONDSIPLANNING DIRECTOR CORPORATION, FOR THE USES AND PURPOSES THEREIN MENTIONED,
AND ON OATH STATED THAT THEY WERE AUTHORIZED TO EXECUTE THE
IN WITN REUNiO--' SAID INSTRUMENT.
-B.$S WHEREOF, WE HE SET OUR-9-IDNATURES-ANS SEALS EXAMINED AND APPROVED THIS DAY OF TLj �J� 1987.
THISP%n�_DAY OF APRIL, 1987. .... ......... ..
WITNESS MY HAND AND OFFICIAL SEAL HERETO AFFIXED THE DAY AND
YEAR FIRST ABOVE WRITTEN.
�WYW, VC
_�TY SbF EDMONDS G-ATTEST, CITY'CLERK
-WILLIAM J
PFR GERALDINt A. F-kSTTA
. . .........
NOTARY,?UBLIC IN AND -FOR THE
HOMELAND HOMES, INC. STATE OP WASHINGTON,
OVV'k-A,NT RESIDING AT
COMMISSION EXPIRES 9-15-17
-ALL PERSONS HAVING ANY PRESENT OR SUBSEQUENT
GH �O OWNE1Z3,:_ A546
.KAU '/,11%RTI1jd. SPA�AFORA IN
MARK A. McNAUGH 0 PNX9RSHIP`-ZN?TEREST THESE.- 1ANDS, AND THE SUCCESSORS AND
PRESIDENT SECRE+W _-ASSI695 OF OWNEM--OR OTHER"PARTIES HAVING ANY SAID INTEREST, STATE OF WASHINGTON)
HERE19i AGREE -THAT TUE--eiTY OF E�MVIbS SHALL BE HELD HARMLESS SS.
---IN ALL RESPECTL;, FROM ANY _AN6.1 ALL CLAIMS FOR DAMAGES FOR
FAMILY SAVINGS AND LOAN ASSOCIATION INJUVCTfVE RELIEF WHICH--AAY BE OCCASIONED NOW OR IN THE COUNTY OF_,9M611i.1L_)
�UTETRE .=--ADJACENT.- LAND OR IMPROVEMENTS BY REASON OF THE ON THIS Und DA OF APRIL, 1987, BEFORE ME PERSONALLY
CONSTRUCTION, JDP6ATION AND M�,INTENANCE.-OE THE DRAINAGE APPEARED MARILYN LaMENDOLA, TO ME KNOWN TO BE THE ASSISTANT
�MARI`LYN LEPMENDOLA SYSTEM, A�N.D-IfEREBY WAIVE AND kELEASr,-1!hE CITY OF EDMONDS VICE PRESIDENT OF FAMILY SAVINGS AND WAN ASSOCIATION, THE
FROM AN76-AND ALL CLAIMS FOR r)AMXGElS-,_ EXCLUDING DUAGE CAUSED CORPORATION THAT EXECUTED THE FOREGOING INSTRUMENT, AND
ASSISTANT VICE PRESIDENT SOLELY BY AN ACT OR omissiqw-6F SiID gTTY AND -INJUNCTIVE ACKNOWLEDGED THE SAID INSTRUMENT TO BE THE FREE AND
RELIEF WHICH THE OWNERS, DR THEIR SUCCESSORS OR ASSZGNS, MAY
VOLUNTARY ACT AND DEED OF SAID CORPORATION, FOR THE USES AND
THEMSELVES RAVE NOW-'W IN TH,.-FUTURE BY REASON.- OF THE
CONSTRUCTION, MA;;NTtHANCE AND-70PERATIOX,--bF SAIQ-�DRAINAGE PURPOSES THEREIN MENTIONED, AND ON OATH STATED THAT SHE WAS
SYSTEM. AUTHORIZED TO EXECUTE THE SAID INSTRUMENT.
WITNESS MY HAND AND OFFICIAL SEAL HERETO AFFIXED THE DAY AND
YEAR FIRST ABOVE WRITTEN.
EASEMENT PROVIS1.ONS--'_ c.
...NOTARYZPUBLIC IN AND FOR THE
EASEMENTS ARE HEREBY RESERVED FOR 4ND GRiNT215"TO THE J_-rTY OF_ STATE OF WASHINGTON
MUNICIPAL' CORPO GENERA TE
EDMONDS, A RATION RUBLIC uTiLiT_y-bi.%T9iET .-BESIDING AT
NO. 1 OF SNOHOMISH COUNTY, L MOM-t6kPA?fi OF THE
COMMISSION EXPIRES
NORTHWEST, INC., WASHINGTON NATURAL GAS COMPANY, .- AND—- 1.
CHAMBERS CA13LE OF EDMONDS; THEIR RESPECTIVE POCCESSORS AND
ASSIGNS, UNDER AND UPON THE EXTERIOR TEN (10) -- FEET fARALLEL
ACKNOWLEOGEMENT WITH AND ADJOINING THE PUBLIC STkEET FRONTAGA. OF ALL-BOTS,
WITHIN WHICH TO INSTALL, LAY, CONSTRUCT, RENEW-; -OPERATE AN15-
STATE OF WASHINGTON) MAINTAIN UNDERGROUND.'CONDUITS, CA'BLES, PIPE, AND 'WIRW-W-ITH
) SS. NECESSARY FACILITIES -AND OTHER EQUIPMENT FOR THE PURPOSES OF
COUNTY OF SNOHOMISH) SERVING THIS SUBDIVISION AND OTHER PROPERTY WITH ELECTRfC
SERVICE, GAS SERVICE, TELEPHONE SERVICE AND OTftR 13SV SF
ON THIS DAY PERSONALLY APPEARED BEFORE ME WILLIAM J. KASPER UNDERGROUND UTILITIES, TOGETHER WITH THE RIGHT TO ENTER UPON . ...... g-.50(03
AND GERALDINE A. KASPER, HIS WIFE, TO ME KNOWN TO BE THE THE LOTS AT ALL TIMES FOR THE PURPOSES STATED. ' OZ'Ct;0
INDIVIDUALS DESCRIBED IN AND WHO EXECUTED THE WITHIN AND R Mr. IN.G."=ERTIFICATE
FOREGOING INSTRUMENT, AND ACKNOWLEDGED THAT THEY SIGNED THE
SAME AS THEIR FREE AND VOLUNTARY ACT AND DEED, FOR THE USES ft�iD FOR REC6RD AVTHE REQbfFST OF Yor"ejAnj H.�cl
AND PURPOSES THEREIN MENTIONED. "7Mrs. 9 DAY OF j� L4 -Je
'17 _QF PLATS, PAGES.?J_'(,
1987, AND.RECORDED IN-VOMU.ME 5 1,
GIVEN UNDER MY HAND AND OFFICIAL SEAL THIS 22,J DAY OF TREASURER'S CERTIFICATE - 7-q INCLUSIVR; RECO.ROS OF SN9HOMISH COUNTY, WASHINGTON.
APRIL, 1987.
I HEREBY CERTIFY THAT ALL STATE AND COUNTY TAXES HERETOFORE
LEVIED AGAINST THE :PROPERTY DESCRIBED HEREIN, ACCORDING TO
THE BOOKS AND RECORDS OF MY OFFICE� HAVE BEEN FULLY PAID AND 0 MI' COUNTY AUDITOR -
A /1. _p - SH Y
INCLUDING TAXES. %
40.t t- DISCHARGED,
NOT4T PUBLIC INAND FOR THE
STA OF WASHINGTON, .1
RESIDING AT B %
Y: is azz-1-9 .
COMMISSION EXPIRES TREASURER, SNOHM_Sli�8U�T' DEPUTZ-SNOHQMISH COUNTY -Aljq��R
;z '
LOVE
K-WAI e- AS 8 0 C I A T 8 13. 1 P Ff 2
LL-SAUER JC.
Ingo
v -- - - - -----------
wl -ow
I '\
W.-
w
ALOHA
SECTION 24,T(.27N.,R.3E.,W.M.
ol CITY OF HOMONOB
cr SNOHOMISH COUNTY, WASHI NGTON
"'�L Coe a
s 0-flo. 2.
AST Mq4.se-
UWE
0
NOTE
2 0 b
2 - FOR COVENANTS, CONDITIONS AND RESTRICTIONS
5 SEE AUDITOR'S FILE NO
0%0
Y!4p&M 33�3_
RECORDS OF SNOHOMISH NGTON.
ALOHA STREET..
.. ......... W
2f
wt-,
z z jJ... Ll P L A IT T
"w
> 0
OD
Lv 41
;,dip
2s—1 ALOHA, �_I_;�T_q_E E T
as 00
AA S22'.
------------- -- -----
0
R
T
H 3
r
-4
Oe 0�
13 W Sq..3.6
1 :2 3%
'o- U.G. b Go-
0
1: L
< 4
I8CALEt-1-60- W 0��Sass.
i Sao
LEGEND
15, Ur.
Ex, Is- uuC`rRGRouuO
UTUTIeS QASG"r.WT
( ..p. uo. 13.0-�'ozoa)
LOVE LL-8 AUBAL ANO ANO ASSOCIATE8.11INC.
'j "-srsa- a — —
6y�
7-
LAND SURVEYOR'S
CERTIFICATE
I M= CERTIFY THAT THIS PUT OF "Ma%" IS
BASED UPON AN ACTUAL SURVEY MM SUBDIVISION OF
SECTION 24, TOWNSHIP 27 NORTH, FM= 3 EWr,
W.M., AS TM7JIRED BY STATE 57ATUM; THAT THE
COURSES, AMLES AND DISTANCM AM SHOW OOR[MOTLY
THERIM; THAT THE MCNIZ04TS SHALL EE SET MD ME
LOT, 13LOCIK AND TRACT CORNETS SHALL BE STAFED
COrMECTLY ON THE GRcm NS CCNS41R=CN is
CCMPL= , RO THAT I HAVE R= OCKPLIED WrIH
PF40MIOM OF ME STATE MM LOCAL STRTUTES MD
REGULATIONS GOVEERTIM PLAIT11G.
GERALD W. LOVELL W. 10
PRO. LAND SURVEYOR
CERTIFICATE NO. 9891
L
wl 3 .
ZI I CAROL
\b WAY
0
it:
EXCEPTION
0
10 T:
0;
3:
Zsslss.. r
0
:2
---- j.06
q
X C E P T 10 N
ol.,
LEGENO I
I
W.E. - �Eil �x ;CITY OF EDMONDS)
U.E. - UrT�, 21Y EkqEMU (CITY OF EDMONDS)
I
W. & S.S.E. = mm AND sANrnm sEwm EAsEKDm (CITY OF EDMONDS)
festo 4 J*
LEGAL DESCRIPTION
THS SOUTH HALF OF THE SOUTRENST QUAFMM OF TIM SOUTH19W
Qlll� OF THE Mln� ql� OF SECTION 24, TOWNSHIP
27 NORTH , PMM 3 EAST, W.M.;
2j EX= THE SCUTR 220.00 FEET TI0REOF; AM,
uj EXOEPT THAT PORTICH OONVEYED TO THE CITY OF MCNDS BY
D RSOOROED Q= AUDITOR'S F= NO. 2111890, IN VOLUME
z 348 OF OFTTCIAL REOORDS, CK PACE 384, REalMS OF S?XM4lSH
LLI CMWN, WASHItCMN; AND,
EXCEPT LOT 1 OF EEMCNEIS SMIT SUBDIVISION NO. S-26-81 AS
THE SAME IS RlDOOF= UNDER AUDrTUR'S FILE NO. 8404260226,
RIMORDS OF SNMVMISH COCNTY, WAMMVTOK.
TOMMM WITH A POMIEM EIL9DMU FM INGFESS, EIZIESS AND
UTIIXTIES OVER THE SOUTH 15. 00 FEET OF 7M NORTH 19.50
FEET OF LOT 1 OF EEMNDS SMU WEIDIVISICK NO. S-26-81 AS
THE SAME IS RDOOl;EED UNDER AUDITOR'S FILE NO. 8404260226,
REOORDS OF SNOtl7lISH OOUNTY, WASHDCrON; AND,
T 7MER WITH A PERIVIMIT EIMMC FOR INGRESS, E2;IESS,
OGE
AND UTILITIES AS CONVEYED UNMM AUDITOR'S FILE NO.
8109010203, REOMDS OF SNMEHISH COUNTY, WASHI?1710N.
B.
THE WESf -.500 F= OF THE SOUTH 75 FEET OF THE NORTH HALF
OF T11E SOQTllEAST qZ`IRTER OF THE SOUTHEAST WIRTER OF THE
_[_NOROSIEST'%� OF SECTION 24, TOWNSHIP 27 NORTH, RANM
3_FWP, W:M.
5 F=ll OP 90 SWTH 150 FEET OF '111E NORTH HALF
�m Nolaw7"
OF im scvffmpm q-pmm of -THE smmmAgr qzkR= or THE
.-Ndmmaft qmRm;t_a--m=cN i-4, TaRMHIP 27 NORTH, PARE
3 E&IT, W . M,;.
Mk:EPT THR,EAST FEET TH17M6F; VM;�
mmm�r oq Namr-15 lm�f 'osTF ii 5.o. fmm� nomr; AND,
7.
0= THAT Pagrim cmvmp - m- �� CrTy OF '"cNDS BY
RECORDED OPM ALWTOR'S F= 4e. 8109010202, Fd=l=
OF SNCHOMISH COM94, VSHTICMON.
-%_8111-111311EV 1__OrIft 2
I-V7044295,10413
q 5
Ilk &vc- MAI
to45�ls�+)
(0�5.
"1800
M
1
r
EX. I O'CITY OF EDMONDS UTILITY
EASEMENT PER PLAT
- - - - I - - - - -
601
N 00026'55" W
5.00'
31:0�" E .00'. 1
. �e Nll�- I\ L2�LL�t53-55` E 21,00,
L5
9 ... . ..
Cn
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - :) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
-bb - 119.00.
------------------------------------- I
r - - - - - - - - - - - - - -- K__ IF N 89-53'55" E
i I 3g: I
PARTIALLY G -G -G- -G- -G- - - - -- - -- G- -G
COVERED -A
EXISTING CONCRETE DRIVE
DECK EX. 19INGRESS, EGRESS AND UTILITY
_j NEW ASPHALT DRIVEWAY TO BE CLEANLY CUT AT EDGE OF
EASEMENT (A.F. NO, 8404260226)
EXTENSION EASEMENT AND REPLACED WITH
C/P/E C/P/E C/P/E C/P
391-511 C/P/E ASPHALT DRIVEWAY
- - -- - -- - -- - -- - -- - -- - -- - -- - --
SEE L1,1 FOR LANDSCAPING
PLAN AT REAR YARD NEW SINGLE FAMILY r - - - - - - - - - - - - - - - - - - I - - - - - - - - - - - - - - - - - - -
N 89053'55" E 115.50'
RESIDENCE 41 [. , I ��. I %
645 9TH AVENUE NORTH .0
N
Parcel #00756500001000
L- - - - - - - - - - - -
i
191_1�
PARTIALLY
COVERED,..,. 24" CHER�RkY
bECK T.B,R -, -
NEW ASPHA DRIVEWAY
LO
NEW ROCKERY, MAXIMUM
CO
00 CONCR TIE riclum I I U lit Ll AbUVt UMUINAL
�o SEE C1,O FOR DRAINAGE R Y GRADE ON WEST SIDE OF WALL
PATIO 1711 CH. III
PLAN
T. B: R
NEW ROCKER�Y, MAXIMUM
HEIGHT TO BE 3ABOVE ORIGINAL �e
GRADE ON VkST SIDE OF WALL
LOT 1
LO S-26-81
"I (A.F. NO. 8404260226)
0 20,,-g 1/2"
V-- --------
Eli
Uj
__�20IIASH
1 0
T.BA'
8" MAPL
E -TYPICAL SPOT ELEVATION INDICATING
ZI
T,B.R.
LU
EXISTING GRADE I ARCHITECTURAL SITE PLAN =3
Q) Cn I >0
+ 1 9
I C/)
10� SEE A1.1 FOR SPOT ELEVATIONS OF FINISHED Scale: o 151 <
GRADE, C1.0 FOR CONTOURS OF FINISHED GRADE AND A1.1 FOR
CONTOURS OF ORIGINAL PLAT GRADE
a) BENCHMARK NOTES
Ci
101-0111
CY) SEE DIAGRAM 2/A1.2 FOR BUILDING HEIGHT CALCULATION ORIGINAL BENCH MARK USED FOR THE TOPOGRAPHIC SURVEY FOR THE
-1-1011 MAPLE ,,-jSETBAcK1 "R" IN COREY ON FIRE HYDRANT ON
PLAT OF ALOHA IN OCTOBER 1986
T.B.R. THE WEST SIDE OF 7th AVENUE N. ±105 FEET NORTH OF THE CENTERLINE
64" FIR OF ALOHASTREET
TO REMAIN A ri
I . �0'. - 1\ -, --- _j I
% BENCH MARK SET OCTOBER 22, 1986 : TOP OF MONUMENT 101 FEET
o, L ----- ELEVATION : 61.62
�q Q/P/F WESTERLY OF THE WEST LINE OF THE PLAT OF ALOHA ON THE
1611 CHERRY CENTERLINE OF ALOHA STREET
TO REMAIN ELEVATION : 88.31
APPROX.
DRIPLINE BENCH MARK FOR THIS SURVEY ESTABLISHED FROM OCTOBER 22, 1986
EXISTING GRADE AROUND BENCH MARK ABOVE : TOP OF MONUMENT AT THE CENTER OF THE
TREES TO REMAIN EASTERN CUL-DE-SAC OF ALOHA STREET NEW UNDERGROUND 200A ELECTRICAL
PROTECT TREES IMMEDIATELY
EX. 101 UNDERGROUND UTILITIES SERVICE PREFERRED OPTION
ADJACENT TO CONSTRUCTION ,�P ELEVATION : 94.91
EASEMENT AFN 8010200315
BY FENCING WITH 3- H WIRE 811 ASH lEX. 51 WATER LINE EASEMENT
FENCE AT DRIPLINE OF TREE TO REMAIN - - - - - - - ---
L- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
---------- L
T-ASH
1811 MAPLE
TO REMAIN tz -W- - - -w- -vv- 4v-- -w- -w- 4v-
TOREMAIN to I ----------------------------------------------------------------------------------------- i - - - - - - - I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - -1
12" LAUREL -------- - (�- EXISTING WATER LINE TO PROPERTY
-q EXIST. FENCE -VERIFY TYPE OF PIPING AND SIZE
TO REMAIN
- - - - - - - T B.R.
14 = - - - - - - - - - - - - - 1011 123.001 1
N N 89-_54-wff" E 105.18, - - - - - - - - -
- - - - - - - - ---
i Lj
I
1A 4,
I I If
/ If
/ 1115.4' 127,25'
If lit
"00
C CULATING
06 1, COVERiD BUILDINb
DECK FOOTPRPT A-1 R TANGLE��
00
00
If I I C I Ij
It I
oil
D
120.2 0 I�
ro",
L-Z
TOPOGRAPHY NOTE
THE CONTOURS SHOWN HEREON ARE BASED
UPON THE ORIGINAL TOPOGRAPHIC SURVEY FOR
THE PLAT OF ALOHA COMPLETED IN OCTOBER,
1986. A CURRENT SURVEY (SEE SHEET A1.2)
WAS CONDUCTED ON AUGUST 1, 2012. SPOT
ELEVATIONS ARE INDICATED ON SHEET A1.2 TO
ILLUSTRATE THE DIFFERENCES BETWEEN
ORIGINAL AND EXISTING GRADES.
HEIGHT CALCULATIONS
A = + 115.41
B = +127,251
0 = +131,751
D = +120.251
AVERAGE GRADE = 123.66'
MAXIMUM HEIGHT = 148,66'
ACTUAL HEIGHT = 144,33'
6 L6 26 (50 S-q 5-
Zone 1� 5� (-'I- Comer Flag--L
,a �ae 8
AM_uired
Actual
�tA Fro N
to
10 0
Si S
(0
R ar
7-
her
to
10, HL
lLeIght
_L5
2-0 - 62
GENERAL NOTES
1 . ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHERAPPLICABLE
LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC)- 2012 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGEAND
MUNICIPAL CONSTRUCTION- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION)
2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS,
4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY,
5, CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL AS- BUILT CONDITIONS ON ONE SETOF REPRODUCIBLE
DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE
BUILDING OCCLIPANCY/FINAL PROJECT APPROVAL,
6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION.
7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE
CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND
TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN, CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE
AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR GROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF
THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS, ENGINEER SHALL BE NOTIFIED IMMEDIATELYOF CONFLICTS THAT ARISE.
8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1 -800-424-5555) AT LEAST 48 HOURS PRIOR TO
CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES.
10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS.
11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORKSHALL BE
PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT.
12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT,
13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e.
HEAVY EQUIPMENT, STOCKPILING),
14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC
MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT,
15, SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES,
16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS, FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM
WHERE INDICATED ON THE PLANS.
17, ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER.
18, ALL ROOF DRAINS, PERIMh7ER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE.
19, ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION SYSTEM.
20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS.
21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A COPY OF
THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO LINDA.MCMURPHY@EDMONDSWA,GOV, BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY
THEREAFTER.
22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS
AND STANDARDS.
23. ALL DISTURBED SOIL AREAS SHALL BE SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION
CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS,
24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL.
CONSTRUCTION SEQUENCE NOTES
1 , SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT� 1326, TWO DAY (48 HR) NOTICE IS
REQUIRED.
2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES.
3. CALL FOR UTILITY LOCATES,
4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE
CONSTRUCTION
5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR, ALL TEMPORARY SEDIMENTATION AND
EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND
SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED,
6. DEMOLISH EXISTING STRUCTURES
7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES,
8. CLEAR, GRUB & ROUGH GRADE SITE, REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY
AFTER ROUGH GRADING, (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW)
9. INSTALL U11LITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS,
10. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE
11, ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL
SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR,
GENERAL NOTES, CONT.
25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT, BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED,
26, SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN.
27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET.
28, CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND
OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND
BRACING, AS REQUIRED.
29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS,
CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL,
30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS ANO/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES, CONNECTIONS TO
EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES,
31. ALL UTILITIES SHALL BE PLACED UNDERGROUND.
32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTORS EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S
REPRESENTATIVE PRIOR TO BACKFILLING,
33. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BEAPPROVED BY
OWNER'S REPRESENTATIVE AND CITY,
34. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 95%. COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING,
35. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES,
36. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING,
37. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK.
38, SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM.
39, PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION.
D BY ENGINEERING
Date:
Forz- &L.
R d6l E S U R -ail
AUG 22 2013
BUILDING DEPARTMENT
CITY OF EDMONDS
REGISTERED
ARCHITECT
No. 8013
0 t
TATE OF WASHINGTON
# DATE REVISION
11C
ra
we plan.
we build.
(FORMERLY MOSAIC ARCHITECTURE)
1208 TENTH STREET, SUITE 201
SNOHOMISH, WA 98290
360-862-8919
DRAWN BY:
C)
CHECKED BY:
APPROVED BY.,
DATE:
CLIENT
Cy APPROVAL,
Wiskerchen Trost Residence
645 9th Avenue Noah
Edmonds, WA 98020
ARCHITECTURAL SITE PLAN
DATE: 8.20.2013
SHEET: Al ez,
L