648 FIR ST.PDF11111111111111 11270 648 FIR ST NOTICE % AND/ OR OWNER PARTIAL APPROVAL VIOLATION CORRECTIONS REQUIRED PERMIT NUMBER pa JOB ADDRESS 64-zO Fl -I "'CEr NO PERMIT - STOP WORK - REMOVE CONSTRUCTION OR OBTAIN' PERMIT AND MAKE WORK COMPLY WITH BUILDING LAWS. CONSTRUCTION IS NOT IN ACCORDANCE WITH "PROVED PLANS AND PERMIT - STOP WORK. MAKE EXISTING WORK COMPLY WITH APPROVED PLANS AND PERMIT OR REMOVE IT. STOP WORK - UNTIL AUTHORIZED TO CONTINUE BY INSPECTOR. CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED. WORK DESCRIBED BELOW HAS BEEN INSPECTED AND IS APPROVED. CONTACT INSPECTOR AND ARRANGE FOR APPOINTMENT. El RECALL FOR INSPECTION. RMMA97122�1 T/--� 619PV�t TR 66 5Aei,- Fan" f?J FAV,7�, THE ACTIONS OR CORRECTIONS INDICATED ABOVE ARE REQUIRED WITHIN DAYS OR PENALTIES IMPOSED BY LAW MAY BE APPLIED. FOR INSPECTIONS CALL: 771-3202. BUILDING DIV. PUBLIC WORKS CITY OF DATE FIRE DEPT. EDMONDS gl 5*-&4ez; City of Edmonds Critical Area Notice of Decision Applicant: � Property Owner: \", , II)I^ -� '�'y " � 0 V� Critical Area File 4: C(Z-A'� o,.)A-7 Permit Number: \3 '�- ��' I '�-o C 6)-- Site Location: G t� QO 1�1- Parcel Number: Project Description: '�Fe-,c--o-ev EfIc"Onditional Waiver. No critical area report is required for the project described above. There will be no alteration of a Critical Area or its required buffer. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. The proposal is exempt pursuant to ECDC 23.40.230. Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequatel y mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). \6 fL( leeviewer Signature Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 1211612010 k 1) V.j Aoak ".10. Im M o X C) \0 -do-Iwo 7— 0 0 :z C'3 to 0 03 C, �kim rq D R T14 toot As0wo to PM IdWCONTRACTOR RESPONSIBL LOCAIIING ALL OWSITE LITILMes. )CATIONMEVISION To Aw plums REQUIRE OVARAIE PRAW, I 1z . k:�� ID (KS gt F49MI&I prvpefty. 7 SOIL CLASSIFICATIONS -FOUR TEST HOLES Am? city MAINtalw Vd1kwL 1 10" Sandy loam 8 " Sand 8 " Sand & gravel Hard blue clay SITE PLAN, SCALE: 2 12 " Sandy loam NOTED 9 " Sand & Gravel APPHOVED AS M JEME; RESIDENCE EERING 6 " Sand & L. gravel NG EERING M 648 Fir Street Blue Clay Edmonds, Wa- 9R020 r 3 12 " Sandy loam 6 " Sand Da te: STANDA.RD DRAINAGE P.LA� 8 " Sand & gravel DETENTION SYSTEM RESUB I - Hard blue clay jr, 4 8 " Sandy loam SEP 112015 JIM 9 " Sand-& small gravel PAGE 2 OF :2 8 " Sand 7 gravel G DEPAFITMENT A Hard packed clay OF EDMONDS I . f. CITY OF EDMONDS BUjp�Q DEpARTMEW WORK r t, 4 ADDRESS If S OWNER rE—: APPROVED DAI BLDG. OFFICIAL pERMg-T HUMBE , W--% eN ^,, if— — lq�f Z' "Nothing in this permit approval process shall be interpreted as allowing or permi-�r.tiag the maintenance of any current] ng ille . gal, nonconformig or. unperrr,�iT%--��- structure or site condition *hi& i�- ;-tcEwie aw.. scope of the permit app lea ian, Of'w,�ether such building, structure oil i.1-4 3hown on the a ite �lan or drawing Sul-,h structure or conTition may be th"'," �,l ibjpct of a'separate enforcement acti—, -1 11!�) U SEP 112015 BUILDIN(a DEp,4RT _ _ ME, Ony OF EDWNDSNT City of Edmonds Critical Area Notice of Decision Applicant: A Property Owner: Critical Area File 4: C(Z-A-� o tb IA-7 Permit Number: Site Location: Gt�93 T-,r '�-r Parcel Number: DID G119 oo"? 0 0 o Project Description: �Fe, (--P-ew 011c,"Onditional Waiver. No critical area report is required for the project described above. I . There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23.40.220, 23.50.220, and/or 23.80.040. 3. The proposal is exempt pursuant to ECDC 23.40.230. Erosion Hazard. Project is within erosion hazard area. Applicant must prepare an erosion and sediment control plan in compliance with ECDC 18.30. F� Critical Area Report Required. The proposed project is within a critical area and/or a critical area buffer and a critical area report is required. A critical area report has been submitted and evaluated for compliance with the following criteria pursuant to ECDC 23.40.160: I The proposal minimizes the impact on critical areas in accordance with ECDC 23.40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23.40.110, Mitigation requirements. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F-I Unfavorable Critical Area Decision. The proposed project is not exempt or does not adequatel . y mitigate its impacts on critical areas and/or does not comply with the criteria in ECDC 23.40.160 and the provisions of the City of Edmonds critical area regulations. See attached findings of noncompliance. Favorable Critical Area Decision. The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Conditions. Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). L( leeviewer Signature \IJ Date Appeals: Any decision to approve, condition, or deny a development proposal or other activity based on the requirements of critical area regulations may be appealed according to, and as part of, the appeal procedure, if any, for the permit or approval involved. Revised 1211612010 HYDRAULIC PROJECT APPROVAL DEPARTMENT OF WILDLIFE 600 CAPITOL WAY N. OLYMPIA WASHINGTON 98501-1091 (R-C.W 75 20 1001 (206) 3-5897 (P-C.W. 7 5. 2 0. 103 F41 May 10, 1990 (applicant should refer to this date in all correspondence) PAGE I OF 1 PAGES FJOAPPLICANT NAME CONTACT PHONE (S) E]CONTROL NUMBER Abrahamson, Jon (206) 771-6125 01-78416-01 STREET OR RURAL ROUTE WRIA ff108 640 Fir Street CITY STATE ZIP Edmonds WA 98020 H 09 E2];WATkR TRIBUTARY TO .976 TYPE OF PROJECT R11CUlvert Tributary Pugp- Sound Installa- F13]QUARTER SECTION TOWNSHIP RANGE(E-W) COUNTY SECT I ON 25 27K 03E Snohomish ----------------------------- tion ---------- TIME LIMITATIONS: THIS PROJECT MY BEGIN AND MUST BE COMPLETED BY July 1, 1990 October 15, 1990 THIS APPROVAL IS TO BE AVAILABLE ON THE JOB SITE AT ALL TIMES AND ITS PROVISIONS FOLLOWED BY THE PERNITTEE AND OPERATOR PERFORMING THE WORK. SEE 114PORTANT GENERAL PROVISIONS ON REVERSE SIDE THAT ARE ALSO PART OF THIS APPROVAL. 1. Fill associated with the culvert installation shall be protected from erosion. 2. Culverts shall be designed and constructed to avoid inlet and outlet scouring. 3. The bed preparation and setting of the culvert(s) shall be ac- comtlishea with a backhoe or other equipment working from the ban . 4. The culvert shall not exceed 20 feet in length. 5. All work shall be accomplished duri,,'Ig a low flow period. LOCATION: Applicant's address S 44 SEPA: DNS, City of Edmonds, March 1990 HABITAT BIOLOGIST: Phil Schneider (206)774-8812 AGENT: Bill Sarvey APPLICANT - FISHERIES - AGENT - INVESTIGATOR - REGION - OLYMPIA: DEPARTMENT OF WILDLIFE �?!� DTRECTOR I �+ vic hz -!�V' 9 11010 N3 f Ell! 0 03 D J? TH MAN �4u� lcol A'Aow-o 111'�_ /I C 40 SUO c�. impeoiwr On %T9400 Ife Is"wAvu- Uitul -3r" � K'Al - U4 51e'0U(t'CrM((' Tlutrum kj, Vc0r, auou�_Vt'� ,ftis ROtIlk VfAfW> tv Mle, 411M%,% CATUA W�Slt). WV f-ce'r. t*41)PS 40-12wm k4t.. ifty. tv, To bt� 4� F-Dixins npwus. E-NAkA I I OtJ mwvj WJ N-yor Mon. SOIL CLASSIFICATIONS -FOUR TEST HOLES .1o. 1 10" Sandy loam 8" Sand 8 " Sand & gravel /"Q Hard blue clay C, SITE PLAN, SCALE: 4>6 ,.,o. 2 12" Sandy loam 9" Sand & Gravel ABRAHAMSON RESIDENCE 6 " Sand & L. gravel 648 Fir Street Blue Clay Edmonds, Wa- 9802o _;o. 3 12" Sandy loam 6 " Sand STANDARD DRAINAGE PLAN 8" Sand & gravel DETENTION SYSTEM Hard blue clay 4 8" Sandy loam 9 " Sand & small gravel PAGE 2 OF :2 8" Sand 7 gravel Hard packed �.-.Iay r w"I W" rvr'_M4� W.''T"Ti so toot 1:91.i sl Uri ID 10-0 04 L 2?00 Cf. Impmow On TWUM kL Vv� auom- mmos uJitli V-P tO tk Ell! ftsm (Cmkk um, To rLOT _ r�AN I, -- lo, LE( PV- SWLLr--lf 4. AMAi,6kwi*4 La. I PMCeL R i V kE D coUNTER 15" Inktr" Acjvpf� �6(oq - tITY OF EDMONDS COMMUNITY SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT A. 0 Owner: GTE NORTHWEST INCORPORATED B. * Contractor: Name 2312—OC WEST CASINO ROAD Mal%�ffiess WA 98204 City State Zip 2100-2814090 242310 State Permit No. 90-440 issue Date q—a6')0 Name Mailing Address City State Zip Carl 488-1620 Telephone Number Address or Vicinity of Construction: 648 FIR STREET Type of Work to be Done: PLACE BURIED SERVICE WIRE AND PVC IN 24' JOINT TRENCH WITH PUD. ALL WORK PERFORMED BY PID . Work in Connection With: 0 Sub or Plat M Single Family 0 City Projects Commercial 0 Multifamily El Utility Z < Pavement Cut::.i 0 Y E9 N U APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds >, harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. 0 U Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed by City forces, at which time a debit or credit will be processed for issuance to the applicant. 0 o A 24 hour notice is required for inspection; Please call Public Works: 771-3202 9 Work is to be inspected during progress and at completion. 0 Restoration to be in accordance with City Code. 0 Street t6ibe kept clean at all times. e Traffic &ntrol to be in accordance with City regulations. A All street -cut ditches must be patched with asphalt or City approved material prior to end of working day; no excepti ns. I understand'thEbove and th t is permit must be available at the job site for inspection purposes at all times. Signature Date: 7-18-90 Owner or Contractor b�erin SuRervisor. TERRY M. 'a This Permit Must Be Posted at the Job Site For Inspection Purposes Call DIAL -DI G Prior To Beginning Work Z U 04 0 44 ISSUED BY: Aw Time Authorized: Void after I NF_Af� —days. Special Conditions: Amendments: PERMIT FEE: Security Deposit: Ar Ttreet ItTut qiimensi:ons���� x NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div. July 1985 FIELD INSPECTION NOTES (Fund I I I Route copy to Street Dept.f Comments: Diagram: 't, CONTRACTOR CALLED FOR INSPECTION 0 YES Partial Work Inspection by P. W.: Work Disapproved By: Date - FINAL APPROVAL BY: Date: Eng. Div. July 1985 C& ­44 CA FILE NO. Critical Areas Checklist Site Information (soils/topography/hydrology/vegetation) 1. Site Address/Location: b �Z E 14-1- 2. Property Tax Account Number: 6 /,7 oc � -00 2- - 0 3. Approximate Site Size (acres or square feet): ZG` >c I 2,o 4. Is this site currently developed? _yes; no. If yes; how is site developed? 5. Describe the general site topography- Check all that apply. Flat: less than 5-feet elevation change over entire site. 06' #*14 /SRO Astor Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% ( a vertical rise of 10-feet over a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): 6. Site contains areas of year-round standing water: ; Approx. Depth: 7. Site contains areas of seasonal standing water: ;Approx. Depth: _ What season(s) of the year? 8. Site is in the floodway floodplain — of a water course. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year- round? Flows are seasonal? _ (What time of year? 10. Site is primarily: forested meadow shrubs mixed urban landscaped (lawn,shrubs etc) 11. Obvious wetland is present on site: Rev 01/04/94 City of Edmonds Critical Areas Determination Applicant: I Shirly Abrahamson Determination #: I CA-96-44 Project Name: 1 —1 Permit Number: I Site Location: 648 Fir Street Property Tax Acct 6194-008-0002-0000 Project Description: non -project specific -1 A site inspection has revealed that Shellbarger Creek flows on or adjacent to the subject property. Shellbarger Creek is a class 2 stream with no salmonid habitat. Based on the above findings, it is determined that there is potentially a critical area on or adjacent to the site. A Critical Areas Study is required to delineate the boundaries of this potential critical areas, the buffers and setbacks. A licensed land surveyor must prepare a map which delineates the stream bank location, the critical area buffer, and the buffer setbacks. All work required by this determination must be performed through a three party contract and all studies must be conducted according to section 20.15B of the Edmonds Community Development Code. If the property owner wishes to apply for a specific development permit which they feel would not impact the Critical Areas located.on the site, they may submit their proposal to the Planning Department for review. If the Planning Department finds that the proposed development permit will not adversely impact a Critical Areas or its buffers, a conditional waiver may be issued on a project by project basis. John Bissell March 25. 1996 Name �qd/ture Date '0 'V� V r% 8 90 - 199 %'Ity Ul r'ulliunm RIGHT-OF-WAY CONSTIMC271M PERMIT ENGIV§p tMr: Issue Date: A. Address or Vicinity of Construction: 41�(017 ST-- B. Type of Work (be specific): NX 7' dqfv C. Contractor: 4Z e��A)q_J'/V(_Contact: ft� )- 9 &J 14 Ad /pf J cL Mailing Address: S,`� �7 ?2 !;�IA �hone: - 34 3 —0 5?_� ? State License #: 50 13 U AR P Q (69 L r Liability Insurance: L..,�Bond: $ 11� D. Building Permit # (if applicable): Side Sewer Permit # (if applicable): E. f_� Commercial E] Subdivision City Project [-] Utility (PUD, GTE, WNG, CABLE, WATER) F1 Multi -Family X Singlefamily Other INSPECTOR: 4��94�x) INSPECTOR: F. Pavement or Concrete Cut El Yes /EqNo G. Size of Cut: x H. Charge$ APPLICANT TO READ AND SIGN INDEMNITY. Applicant understands and by his signature to this application, agrees to hold the City of Edmonds haimless om 41rJ"4* ges or claims of any ikind or description whatsoever, foreseen or unforeen, that may be made against the City of Edmonds, or any of its depak, remploy- ees, including or not limited to the defense of any legal proceedings including defense costs, and atiomeyfees by reason of granting this permit. THE CONTRA CTOR IS RESPONSIBLE FOR WORKMANSHIP A AD MA TERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC77ON AND ACCEPTANCE OF THE WORK. EST[MATED PESTORA77ON FEES WILL BE HELD UN77L THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH 77ME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Construction drawing of proposed work required with permit application. A 24 hour notice is required for inspection; Please call the Engineering Departmen T'-,'. Work is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. 771-0220 Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink copy of the permit will be available on site at al=r inspection pu . 1 1 A '007 Signature: �r'4' 09 , k4az�57'oa Date: Contractor or Agent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK ENTS;, RECEIPT. NO W1 IN PRIOR TO PERMIT Engrg. Div. 1991 Eng. Div. July 1985 V, I 71WWWWWR-1- I '-�' -7-,-'- ' -__ _-­ T -. N Z 0 W U 04 0 fl. CITY OF EDMONDS COMMUNITY SERVICES DEPARTMENT RIGHT-017- WAY CONSTRUCTION PERMIT Permit No. 90-449 Issue Date C� - o A. e Owner: aQ 0 GA AV\ A r4 SO t-J* B. 0 Contractor: Name Name (,--7 4-0 I= 4WA c1cl Mailing Address Mailing Address emmabo)-s (A) A Ci ?o7_0 WA CV9 0 U. City State Zip State Zip A-T lu'Ffx IN State License Number Telephone Number C. Address or Vicinity,of Construction: Type of Work to be -Done: 10516%tl­ 9-164:6L PIPE C10 9-115T PQ Lk 90 R& STRAif-T Tg�(--NCIA IN P-1W 10 P9-0Q1CW_- (�6, S'VC- FQV_ N6*3 CUS-T D. 0 Work in Connection With: 0 Sub or Plat PoSingle Family 0 City Projects El Commercial 0 Multifamily 0 Utility E. 0 Pavement Cut: C3 Y &K F. 0 Size of Cut: - X APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless. from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, aqy of its department-s or . employees, including or not limited to the defense t of any legal proceedings including defense c6sl�'kourffwl a t e fees reAs6n of,, t FJfi'( granting this permit. -DAVEC) �_4 TYCAR, TE JAS FOR A PEk1O6J0qCQNE THE CONTRACTOR IS RESPONSIBLE FOR WORK HIP ANO A�a ?i, YEAR FOLLOWING THE FINAL INSPECTION AND9tE:PTANCE OF YHE WORK. Estimated restoration fees will be held until the final street patch is completed by iciiy forces, at which time a debit or credit will be processed for issuance to the applicant. • A 24 hour notice is required for inspection; Please call Engineering: 771-3202 • Work is to be inspected during progress. and at completiom� • Restoration to be in -accordance with City Code. • Street to be kept clean at all.times. • Traffi c* Control. to be in accordance with. City regulations. - • All street -cut ditches must be*patched with asphalt or City approved material prior to end of working day; NO EXCEPTIONS. I understand the above and that this permit must be available at the job site for inspection purposes at all times. 90 A^r4l Date: Signature: MA Owner or Contractor This Permit Must be Posted at the Job Site For Inspection Purposes Call DIAL -A -DIG Prior to Be-&'ning Work 1Nm5PFc_'r0F,. LYLF— CHRISOAN APPROVEDgy: At,& Time Authorized.- Void after days. Special Conditions: NO TRFWrH1WCx- N PA_VEh4F_p!1T PERMIT FEE: $ 3P Req4Vwt2rPee: CVeceipt No.: Fund I I I Fee: Sireet Cut Dimensions: $ RELEASED 13Y-.\�" ate -a 0 INSPECTED BY Date NO WORK TO BEGIN PRIOR. TO PERMIT ISSUANCE tng. um marcn mv FIELD INSPECTION NOTES Comments: Diagram: V (Fund I I I Route copy to Street De�t CONTRACTOR CALLED FOR INSPECTION 0 YES E] NO Partial Work Inspection by P. W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. July 1985 CITY OF EDMONDS ASSET INFORMATION SHEET ONEW El ADDITION 1:1 RETIREMENT ASSET NO. ADDITION TO ASSET NO. 15 -5 () 0 (10 () ?I cf- 3 o -50 DESCRIPTION 2 SERIAL NO. LOCATION G Lt3 DEPT. NO. Fie- Is PURCHASE ORDER NO. PURCHASE ORDER DATE COST PROJECT NUMBERW O:Ys!o S 7 PROJECT COMPLETION DATE 1-30:20 COST B.A.R.S. ACCOUNT NO. 0 0 1 �, 3 YS-- (Do, (a 3 ESTIMATED LIFE INITIATED BY DATE APPROVED BY "SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST *SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT ACCOUNTING ONLY 4rDEPRECIATE MONTHLY DEPRECIATION AMOUNT ANNUAL DEPRECIATION AMOUNT I 0 G.L. ENTR REFERENCE DATE VERIFIED BY PROCESSED BATCH NO. (yp) INITI DEPARTMENT FILE Ilk q8 STREET F�LE MITIGATED FILE# N/A DETERMINATION OF NONSIGNIFICANCE Description of proposal Single Family Residence Proponent Jon W.R. Abrahamson Location of proposal, including street address, if any 648 Fir Street, Edmonds, WA 98020 Lead Agency Edmonds Planning Division The lead agency for this pro posal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. X This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date below. Comments must be submitted by March 22, 1990 Responsible Official John Bissell Position/Title Code Enforcement Tech. Phone 771-3202 Address 250 5th Ave. N., Edmonds WA 98020 Date January 23, 1990 _ Signature ')5wa X You may appeal this determination of nonsignificance to- Hearing Examiner at 250 5th Ave. North, Edmonds, WA 98020 no later than 5:00 p.m. April 1, 1990. by filing a written appeal citing reasons. You should be prepared to make specific factual objections. Contact John Bissell to read or ask about the procedures for SEPA appeaTs. There is no agency appeal. CONDITIONS OF MITIGATION ABRAHAMSON HOMES BUILDING PERMIT This determination of nonsignificance is subject to the following conditions: 1. All excavation and grading shall comply with Chapter 70 of the Uniform Building Code, 1989 edition. 2. The Applicant shall obtain a building permit from the Building Department and comply with all conditions of permit approval. 3. The applicant shall submit a drainage plan to the City Engineering Division and follow the required guidelines. 4. The applicant shall use a filter fabic fence along the stream during construction in order to prevent sedimentation of the stream. In addition, the applicant is do make every effort to keep all exposed ground covered during construction to minimize erosion on site. 4.41-z- 674B FM S7- Complete this checklist for nonproject proposals, even though questions may be answered "does not apply". IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area." respectively. A. BACKGROUND 1. Name of proposed project, if applicable: Wev- 4#4 Wetall 0-/eft- FEB -2 8 1222 2. Name of applicant: / /�/,, /,,, 41, / 'e"A M N, k . " 3. Address and phone number of applicant and contact person: I/ g 4. Date checklist prepared: ;F — A ?— 'Yo 5. Agency requesting checklist: ev, ;(. IV '40 le 6. Proposed timing or schedule (including phasi ng, if applicable): 'vat, -f 114- L-f, il /V-Q J e- ii le pf j��j �- ?/,A Y eW 7. Do you have any plans eor-future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. //0 10. List any government approvals or permits that will be needed for your proposal, if known. hlo Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You'do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) 71 J4C& 1C,P1t(&Vtk- V f kq, /to AIX "t C weft C P 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one):Ca�t rolling, hilly, steep slopes, mountainous, other F14'i- b. What is the steepest slope on the site (approximate percent slope)? sa C at general types of soils are found on the site (for example ;1 4�jDa c rave peat, muck)? If you know the classification of agricultur soils, specify t m Oem and note any prime farmland. ellzr / 4:74 it 41 2�- a-l't Ve d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. //0 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. ike. e '11) '9 Ve 44-00 CU ek #Adtir WL 6 F a P ( el A r,- /4 /f h � le-.- f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. 01 9. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:, 'L 4o Ze* , r,& le AL foh Vir zvv- I A po 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. //0 c. Proposed measures to reduce or control emissions or other impacts to air, if any: A If Z4 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. C a i4le 1� 2) Will the project require any work over, in or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Ot U h 142, AO 04 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. //0 it el 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. //0 & e_ b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. /1/0 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals ... ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. -Y-4e$' lekt-' c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. yO, h IC 4 1- 1 Ef 2) Could waste materials enter ground or surface waters? If so, generally describe. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: fL j- 1,4 Z 7 4. Plants a. Check or circle t of vegetation found on the site: deciduous tree: 0§3 , maple, aspen, other Jr. evergreen tree: ir, cedar, pine, other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation — -iKlre-f . b. What kind and amount of vegetation will be removed or altered? 4' jr — c. List threatened or endangered species known to be on or near the site. *,A C, d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: -? h 71'a &' il /, t. 0�� , f'"I 'b I't e. e 5- - V? 4 V-.Ile tt 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, Co:n =bir]), other: ............................. mammals: deer, bear, elk, beaver, other: ................................. fish: bass, salmon, trout, herring, shellfish, other: .................... b. List any threatened or endangered species known to be on or near the site. //0 A e c. Is the site part of a migration route? If so, explain. 1410 d. Proposed measures to preserve or enhance wildlife, if any: 6. Energy and Natural Resources a. What kinds of energy (electric tural gas oil, wood stove, solar) will be used ' d��_ to meet the completed project's energy neea- Describe whether it will be used for heating, manufacturing, etc. #" � r': '/ //,. -Z W 'Z' � C* A — 1e I b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any- le t"ra 4 / le, 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. //0 1) Describe special emergency services that might be required. 1�1-o,) e- 2) Proposed measures to reduce or control environmental health hazards, if any: b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? A A &_ 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. L/lcr) /I S' ZP4- " C- ?�-1 a �' -�7 0 [A J� & -f 3) Proposed measures to reduce or control noise impacts, if any: 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? ug O-C 'le , — V4 b. Has the site been used for agriculture? If so, describe. ,FS lzj v ev e / a r A -( e 41JAJO-41 c. Describe any structures on the site. kr4l & // V� 4e Ko/&01 d. Will any structures be demolished? If so, what? '1--in a- // t� a -c-de t., X� e_ W e. What is the current comprehensive plan designation of the site? h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. i. Approximately how many people would reside or work in the completed project? f4-d 44 ?1 q j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: /�,& I C 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: 4011, " V Id" cc e6e. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. -Z b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. /)/,C ), & c. Proposed measures to reduce or control housing impacts, if any: //a,, e - 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 01 b. What views in the immediate vicinity would be altered or obstructed? /4/.0 it (f c. Proposed measures to reduce or control aesthetic impacts, if any: zriq& A( ft'/' , "Y r � '/' L - /' 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? k1o'clo La 'r /Z J__V b. Could light or glare from the finished project be a safety hazard or interfere with views? *0 c. What existing off -site sources of light or glare may affect your proposal? Ao 11 4e d. Proposed measures to reduce or control light and glare impacts, if any: L 12. Recreation V / a. What designated and informal recreational opportunities are in the immediate vicinity? b. Would the proposed project displace any existing recreational uses? If so. describe. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: //�� An? A e a* W I (_ / 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. A b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. #0 14 C_ c. Proposed measures to reduce or control impacts, if any: Allp 4 e 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. X Z�- & &-,/ /14 A %/ ew 4C. VC, 14 CY b. Is site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? c. How many parking spaces would the completed project have? How many would the project eliminate? d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). //0 - e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. //0 f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. 'FV rit /it' g. Proposed measures to reduce or control transportation impacts, if any: 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. *6 b. Proposed measures to reduce or control direct impacts on public services, if any. *0 16. Utilities ectrici !�a�tu r a alg as a. Circl 444-tias-,Urrentl available -al -the -site: 4� 4� (ejfus�� elephon �Vanitary sg�?, s I eptic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. C. SIGNATURE The above answers are.true a�d C!M ete to the best of my knowledge. I understand that the lea gency is in I Xhem to make its decision. Signature ... ... ....................... t Date Sub tted: ... 1-Z.. ..!�fc ...................................... D. Supplemental Sheet for Nonproject Actions (Rezones, Code Changes, Annexations, etc.) -- Do not use this sheet for project actions. Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? zva � e 4 h et e Proposed measures to avoid or reduce such increases are: 4 ze'(( rta" , 'y t�r 5- le- w � 2. How would the proposal be likely to affect plants, animals, fish, or marine life? Proposed measures to protect or conserve plants, animals, fish, or marine life are: "'a"ll CO- 4%-,q K q r7 &,,,n em--64- 3. How would the proposal be likely to deplete energy or natural resources? Proposed measures to protect or conserve energy and natural resources are: Ak it 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? A it, d Proposed measures to protect such resources or to avoid or reduce impacts are: A/0 /hva , �- 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? IV, eAl- I e Proposed measures to avoid or reduce shoreline and land use impacts are: 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Proposed measures to reduce or respond to such demand(s) are: 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. A/O Co kt �e /' � � , ENVCHK3/PFORMS TO: Permit Coordinator, Building Division FROM: Dan Smith, Engineering Inspector ADDRESS 6�9 - C-1 e_ OWNER by'a PLAN CHECK # After review of the subject building permit application, we have the following comments: 1. Construction hours are: WEEKDAYS ........ ..7:00 a.m. to 10:00 p.m. WEEKENDS/HOLIDAYS..10:00 a.m. to 6:00 p.m. 2. A Right -of -Way Construction Permit is required for any work on City property. 3. Connection to City water system required. Fees paid. 4. -Connecti on to City sanitary sewer system required; obtain separate permit.' Fees paid. 5., Water and sewer lines to be separated by 10 foot minimum. 6.- Driveway must be paved a minimu� of 20 feet back from City . right-of-way; separate permit required. 7. Driveway slope not to exceed 14%. , - 8. Back water valve required if downstairs plumbing is below elevation of upstream manhole. 9. Builder/Owner responsible for containing all temporary runoff and erosion control on site.* Construction may not impact neighboring properties in any way. , -F-o,5f(d) F( Oer J!�,oce atorg cKeefe-, 10. No burning of construction refuse without approval from Fire Dept. 11. Street to be kept clean of debris, dirt, mud, and construction materials. Contractor responsible for dust control. 12. Inspection required on drainage system, catch basin installation, driveways, and sidewalks. A final engineering inspection is required prior to the building division granting occupancy. 13. R p a Wior Vep a fe e 1 r 0 s*de lk if in Vee ncts i Ir c I a s a b re red JGA516W 5(6�Na (k ocrc xist/fng\\curb u t\,t\,e r , i rr_0 9-Ked, i��-dill`tio rfwheel0�air 6�1q�Z or cqValn WAIVer- U CI 0 'Aw JlajUt�� BLGPER/TXTFORMS IT e W- � 2", 177 M E M 0 R A N D U M DATE: March 26, 1990 ks Director ?33 To. Bobby Mills, Public Wor VIA: Mary Lou Block' planning Manager Permit Coordinator J. FROM: 0eannine L. Grafs SuBJECT: Proposed SF Residence at 648 Fir Street owner: Abrahamson tly reviewing a permit application at The building division is curre 11 bmittal process the owner, Mrs. the subject site. During the su d me of an exic,-ting 11stream" that runs I inadvertently informe cross the Abrahamson, line and then travels west a north along the east property not show any water courses north property line. Her site plan did �e altered to show the site plan must I Ily informed her that the top of the bank must I officia h a flow- Also, k could be met. coursess dry or witl . ed 15 foot setbac all water to prove that the requir be shown time that she was aware of stream it was apparent to me at this -Middleton was working runs e she informed me that Reid requirements becaus rtion of the stream that lvert a po e permit with her on a proposal to cue. I then informed her of Stat operty lin tream that runs along along the north pr orking within a stream. The S requirements for w line was to remain open. the east property ter and informed me that (3/26/90) she came to the coun- ew working within the stream bed Today, a City cr tion of the ately one month ago, d changed the loca f the bank approxim idth of the stream an., m the top 0 had increased the w equired 15 foot se,tback fro, City,, workman. She top of the bank. The r . now jeopardized due to ' ing the existing to the building footing is n altered site plan show could not provide me with a top of bank. stream bank and the changed as to whether vestigate 'this matter and respond by memo Bobby, please in sponsibilitY in this issue. the City has any re UPPER C XMH of BASIN VIETENTiON PIPff LENGTH %3�s r-OWrIL01- CATCH (yr.NT) 4 --4� Ir &AS I N it MIVA, 2' MAX COVEP. —1 :7 % 5LOPF-.e. SYSTEM CROSS SECTION SEE PAGE 3 FOR** OUTLET CONTROL DETAIL OLML.&T CONTROe 4- ,7- 'TO OLMWET (P-i PRA.P OR RU14OFF SPREADER) "V43"'Ell rp%*.'VIFL� flILITFLOW TRENC", MIN 10' LONG, 'rOP 4 4" P67ftF POPE 'To Off LA--vwj- L--y FROM 0LrrLET CON-rikoL OL 4� PF-RF PIPE WITH C4PS RUNOFF SPREADER OUTLET -STANDARD DRAINAGE PLAN DETENTION SYSTEM PAGE I OF 2 for ABRAHAMSON.RESIDENCE location 648 Fir Street pamr-AMA- YA a QR09n plan by Owner - - ' - phone' 771-6195 da te DESIGN DATA System Imperm Pipe Pipe Orifice Number Area Diam Length Diameter 1 12 . , ')�e6tlj 01f /S 1 NOTES 1. Call Engineering Division (771-3202) for prebackfill and final inspections. 2. Responsibility for operation and maintenance of drainage systems on private property is the resDonsibility of the property owner(s). Material accumulated in the storage pipe must be flushed out and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times. R j�..: C L:� I V e D APR - 2 1990 prq _ MIT COUNTER CITY OF EDMONDS 7- tAVM DR T)4 C//- V tle�&VKO�Al C(& "� I" k) 2 Z Lr n to .0 . F.91,6151 __ /F1 i SOIL CLASSIFICATIONS -FOUR TEST HOLES No. 1 10" Sandy loam 8" Sand 8 " Sand & gravel Hard blue clay No. 2 12" Sandy loam 9" Sand & Gravel 6" Sand & L. gravel Blue Clay No. 3 12" Sandy loam 6" Sand 8" Sand & gravel Hard blue clay No. 4 8" Sandy loam 9" Sand,& small gravel 8" Sand 7 gravel Hard packed clay 1140 M1 /;�-o 0 Z"n � 'D /",q / � /91 CaIr- v T"I"t kL F�Ottob towmC A to (At V(5m,% tA10A fAsw. ur� F-af Milos levWlt tum *101AML *-�t�jtjw - - - j)(rd To btj df nixmr, I(Apwus' E-UAQA I I otj Mon. SITE PLAN. SCALE: ABRAHAMSON RESIDENCE 648 Fir Street STANDARD DRAINAGE PLAN DETENTION SYSTEM I PAGE 2 OF :2 TO: Permit Coordinator, Building Division FROM: Dan Smith, Engineering Inspector ADDRESS fZ Sf-7eee-f_ 2- OWNER hyn kaVH59A -A7*PAZ-,7 F CK # After review of the subject building permit application we haf"e/t following comments: 41� 1. Construction hours are: WEEKDAYS ........... 7:00 a.m. to 10:00 p.m. WEEKENDS/HOLIDAYS..10:00 a.m. to 6:00 p.m. 2. A Right -of -Way Construction Permit is required for any work on City property. 3. Connection to City water system required. Fees paid. 4.. :Connection to City sanitary sewer system requ-ired; obtain separate permit.* Fees paid. . .. 5. Water and sewer lines to be separated by 10 foot minimum. 6., Driveway must be paved a minimum of 20 feet back from City. . right-of-way; separate permit -required.. 7. Driveway slope not to exceed 14%. 8. Back water valve required if downstairs plumbing is below elevation of upstream manhole. 9. Builder/Owner responsible for containing all temporary runoff and erosion -control on site'. Construction may not impact neighboring properties in any way. , _17415fall f(lkr Pvta eq[OT 01Keek-.. 10. No burning of construction refuse without approval from Fire Dept. 11. Street to be kept clean of debris, dirt, mud, and construction materials. Contractor responsible for dust control. 12. Inspection required on drainage system, catch basin installation, driveways, and sidewalks. A final engineering inspection is required prior to the building division granting occupancy. 13. R 'pai or epl c al efect* e exis n curb, u 'er, s de I k If in er ec ion s in ed-, i latio wheelchair a s a b re red. Jil 5(( adclif,P or o�401v, WA(Ver- I (h]C164qaXi04 60(v-(0,1� V-evtl 0 R BLGPER/TXTFORMS q , — _�7_ J 7472F 5�� n?z w-4 r J ?PF- P, 41 ; BASIN DETENTION PIPE LENGTH COKrROL CATCH 5#15 1 K 1 0 MIN , 2' MAX COVE& ---1 7 SLOPF---w SYSTEM CROSS SECTION OLrrLr.T CONTROC ,e7 'M OLfT&.E*T (N P RA-P OR PIUNOFF .5PREKDEV.) F.E PAGE 3 FOR OUTLET CONTROL DETAIL . SrREEr I0 , I (I(; S I a"Vie'l OUTFLOW TFLENC". NAIN 10' LONG, T01' -4' PERF PIPE -YD The * FROM 0 -ET LM * ZON-rROL 4' PERF PIPE WITH CkP-% RUNOFF ISPREADER OUTLET STANDARD DRAINAGE PLAN DETENTION SYSTEM PAGE I OF 2 for ABRAHAMSON RESIDENCE location 648 Fir �T—reet plan by phone 771-612S date I DESIGN DATA System Imperm Pipe Pipe Orifice Number Area , Diam Length Diameter 011 4f 1 NOTES 1. Call Engineering Division (771-3202) for prebackfill and final inspections. 2. Responsibility for operation and maintenance of drainage systems on private property is the resDonsibility of the property owner(s). Material accumulated in the storage pipe must be flushed out -and removed from catch basins to allow proper operation. The outlet control orifice must be kept open at all times. I�IAAS L) ;r CITY OF EDMONDS ,::I- 00 C) V) CITY of EDMONDS For Inspection Call 771-3202 PLEASE READ THE ITEMS LISTED ON THE BACK y ertify tbAl-4—h-a-ve rL�,&�-6d shall comply _�/With the items listed on the back. SIVE S.E�VER P E'R7,.0.I,T PERMIT NO*-. OR Address of Construction: L4 Ir, V'e, L Property Legal Description (Include all easements): Zc)7—,4 Owner and/or Builder: t4i �-d q I Contractor & License No: 5e 6 r-,-14C / Zlj:;�F4 4- 94�53 9 2— Single Family Residence Multi -Family Commercial (No. of Units (No. of fixture Units EDMONDS TREATMENT PLANT Invasion into City Right -of -Way: No Yes (If Yes, Right -of -Way Construction Permit required. Call One -Call -Center (1-800-424-5555) before any excavation.) Cross other Private Property: No &,� Yes (I s, easement required, q7 attach legal description and county easement number, b, #� R LOE I VED MAY 1 3L�- 0 Date PUBLIC I'VORKS Permit Fee: Jssued By: J�7 Trunk Charge: Zs I Date Issued: 511y / 7 0 Assessment Fee: Receipt No.: IZ3 10 Partial Inspection: Comments Date Initial Final Inspection Approved: Datd -fnitial Rejected: Reason —N—te PERMIT MUST BE POSTED ON JOB SITE Wh.ite Copy - File Green Copy -'Inspector Buff Copy - Applicant I t Side Sewer Drawing -The City of Edmonds EASEMENT NO - ------------------- --------------- NEW CONSTRUCTION REPAIRS F-1 LID NO - ----------- ...... ASMT. NO - ------------------ OWNER------------------------------------------------------------------------------------------------ CONTRACTOR — --------------------------------------------------------------------------------- PERMIT NO. Dlt�_L JOB ADDRESS ITZ — ----- �7_ ........ ----------------------------- LEGAL DESCRIPTION: LOT NO - -------------_----------- ---------- BLOCK NO - --------------- EDMONDS ------------------------------------------- ------------------------------------------------- -------- ------------------ [TREXCME-N-T --- PLANZ NAMEOF ADDITION ------------------- I --------------------------------- ---------------------------------------------------------------- Ll Lf V, A' Ll- L�l -I- 14 1TV-e- e�'_e3).e e,09 0 Of Tlb I 0�:JraoL 194 1 (e ( Pu.c, \.�Tl V'r, Ilk C-17 kiD To S%trWC Approved: A/ P -0001-11/75 (REVA 1/78) WW DATE ... . ................ By ----- ------------------------ V CITY OF EDMONDS CONSTRUCTION PERMIT APPLICATION OWNER NAME/NAME OF,BUSINESS A 0 k w MAILING ADDRESS Z 3 0 CITY TELEPHONE NUMBER Z,P7 6) NAME F- . A LOU ADDRESS L) cc <ICITY ZIP [TELEPHONE NUMBER NAME 47 h jr,�N Y J, ADDRESS CITY ZIP I TELEPHONE NUMBER STATE LICENSE NUMBER .5 ( c ?-7 ",,q (_ //-/ 71k-, L Legal Description of Property - include all easements Z (show below or attach two copies) 2 Uj Tax Account Parcel No. 0/0 Lj 21 R El NEW RESIDENTIAL PLUMBING ElADDIALTER 1:1 COMMERCIAL El MECHANICAL ElREPAIR 1:1 APT.BLDG. 0 SIGN EXCAVATE, FILL El 1:1 OR GRADE FENCE E] DEMOLISH (_ X _FT) CARPORT E] REMODEL swim GARAGE POOL FWOOD STOVE I F7 RETAINING WALL/ -I INSERT I I ROCKERY RENEWAL (TYPE OF USE, BUSINESS OR ACTIVITY) EXPLAIN: RE (n NUMBER OF STORIES LU NUMBER OF 0 ca 7WO DWELLING UNITS 0/ ylc_ 0 NATURE OF WORK TO BE DONE,(AT-TACH PLOT PLAN) // I- v lr� " n (. & USE ZONE NUMBER q-01DE9, JOB ADDRESS .EGAL DESCRIPTIO ECK SUBDIVISION NO. LID NO L-07- A 15-2-41- Ib 6 PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP. TESCP EXISTING REQUIRED DEDICATION APPROVED BY PROPOSED i��, RIGHT OF WAY CONSTRUCTION PERMIT REQUIRED STREET USE PERMIT REQUIRED 0 SEE ENGINEERING MEMO DATED R�A QRK METER YZE/ IBUILDING WPPLY SIZE FIXTURE UNITS 2- 1 j I .to 1 HTR A 4)10 SIGN AREA ENV. REVIEW ALLOWED PROPOSED COMPLETE EXEMPT VARIANCE OR CU PLANNING REVIEW BY SETBACKS — FEET HEIGHT _ , I ILOT FRONT SIDE ` _ 1EAR Ir- .— e< REMARKS SUITE/APT # Z Z a: Uj 7DB NO. ORELINE# DATE 0 ':RAGF Z Z Z -5 C E CKED BY TYPE OF CONSTRUCTION CODE HEIGHT HE K - E B C Y SPECIAL INSPECTOR AREA OCCUPANCY OCCUPANT R Q EQUIRED GROUP LOAD M YES NO S REMARKS P PROGRESS INSPECTIONS PER UBC 305 41— AJ -Wl- 00e0k IV6 WA I" 6y 1_J04e!5 :5 1,1 P -- 7V Ae OV �,(17MJ,,,7S Or 57,17f H V4XA U10CS A-tv Ir o -3v FINAL INSPECTION REQUIRED VALUATION PLAN CHECK FEE lKriliry" 4-LIL/ LYU-11 PLUMBING Plan Check No // Z MECHANICAL This Permit covers work to be done on private property ONLY. GRADING/FILL Any construction on the public domain (curbs, sidewplks, STATE SURCHARGE driveways, marquees, etc.) will require separate permission. Permit Application: 180 Days Permit Limit: 1 Year - Provided WorK is Started Within 180 Days "Applicant, on behalf of his or her spouse, heirs, assigns and successors in interest, agrees to indemnify, defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT modify, waive or reduce any requirement of any city ordinance nor limit in any way the City's ability to enforce any ordinance provision." TOTAL AMOUNT DUE I hereby acknowledge that I have read this application; that the information given is correct; and that I am the owner, or the duly ATTENTION authorized agent of the owner. I agree to comply with city and state laws regulating construction; and in doing the work authoriz- ed thereby, no person will be employed in violation of the Labor THIS PERMIT AUTHORIZES ONLY THE Code of the State of Washington relating to Workmen's Compensa- WORK NOTED tion Insurance. INSPECTION DEPARTMENT 3IGNATURE (OWFER OR AGENT) DATE SIGNED �0 CITY OF r- r) KA rl M r) CZ -'ATTENTION CALL EGW' INSPE&ION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR 771-3202 A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC CHAPTER 3. 102-87 III 71 -200 llqje? APPLICATION APPROVAL This application is not a permit until signed by the Building Official or his Deputy; and fees are paid, and receipt is acknowledged in space provided. OFFICIAL'S SIGNAVURE DATE BRtIASED BY: DA I TE R 91P0 // /V 0 Z ORIGINAL — File YELLOW — Inspector PINK — Owner GOLD — Assessor m4VLDVW�.-, �61364�10 PR(= NAMM 5r '40hm-sov PRO= ADDRESS: Iq,< APPLICATION REMIPT DATE: J2 e/-?o COMMENTS FIRE Sn4= FAMILY/MULTIPLE/CO24ERCIAL - (Circle One) PLANNING Reviewed by: (initial/daFe) WIR/SWR STREET I ENGNRNG BUILDING /77/7F/7 777-7-7777// SETBACKS CHECYCED - Plarming VARTANCE/SETBACK ADJ. '777T=TT1= I CONDITIONAL USE PERMIT 2 ADB REQUIREMENTS CHECKED 7TTR7----"-77TFfT1717T17771-1 ///////// //////// - 3 OrM ZONING REQUIREMENTS 777T=7/////// 77777F/777 111A111111 - 4 EtMR=,0?MAL FEATURES 777777 5 AccEss sLoPF, & vEHicLE ACCESS 6 DRAm= PLAN (on site) 7 7 7 7 77 TITIT17.7 7 7AI J#/ /1A 7 STREET FILE I V 77T777777 8 LEGAL DESCRIPTION WRIFICATION T=TTT= QUIT CLhIM/DEDICATIONS '777T 77777 '77T 77T77777 Ef EASEMENT - PUBLIC/PRIVATE Obif4,64W CALCULATE SEWER CONNECTION IF NO LID# 11111777TT=7TrM111 ///W 77777 it 12 PLAT/SUBDIVISION REQUIREMM 777777777 7Tr= 13 RIGHT-OF-WAY CONSTRUCTION PERMIT REQD ITMI y/Wt Y//////// 14 BOND REQD-FOR PUBLIC IMPROVEMM 77/777. Wh f/ 77777777777777777 15 SOILS CONDITIONS & GROUND WATER FIELD CHECKED 11117717T -TTR= ///////// 111111-44 16 &ITIRM WING REQUIRED TM///// 17 CURB AND GL"TER REQUIRED 77TI71 ///////// 177777777 /4p////// 18 SIDEWW.K REQUIRED 77777777 TRI11111 19 CURB CUT MR DRIVEWAY REQD STREET NAME SIGN REQD 777777777 21 OTHER.SIGNING REQD /7777777.777777777 ///////// -7777= . - 22 SIDE SEWER AVAILABILITY 777777 777T= 77T=. 23 EXISTING WATER MAIN SIZE ell ////T= 24 WATER METER SIZE 25 SERVICE LINE SIZE /* 26 HYDRANT REQUIRED 27 - HYDRANT SIZE EXISTING 7 =-- 7TfT= TTIT7TIT17 28 CROSS CONNECTION INSPECTION REQD 777777 77T/777W 29 VATER METER CHARGE REOD 77TM- owe, 30 FIRE'LINE CHARGE REQD -.SPRINKLER 777TF/T//7 31 STREET CUT 1 4/ 32 :7T/T/7 OPEN DITCH EXISTING 77TI= I — 33 REQD .34 CULVERT F= 7T./T/77777= 35 SIZE 7TRII 36 CATCH BASIN REQD 7 7 7 7 7T ////// 77T7=. 777 IT17T 1111W11 37 INDICATED ON SITE PLAN 777777 777777777 38 SHOULDER DRAIMGE MAINTAIN SHALE OPEN RUNOFF 39 MISC: - I 111111117 ///////// I ///////// 40 .B 2 8 1980 UBUG ORKS REVILWED BY: PLANNINC MGR. ENGINEERING MGR. PUBLICf,MRKS MGR. cr Ce, of F, TJ ...... ...... LU! LLI >eSECONADARY P OLE� STENCILING. FROM J0. MISCELLANEOUS �EES JAKE OFF POLE VAULT PRE—CONSTR. REQUIREMENTS .. . ...... .... PERMIT'_$3��_ -EI TREE TRIM 0 PUD LOCATOR BACKHOE 0 $kbNE CALL DATE TOTAL DUE S DATE PAID RECEIPT# NEW SVCE APPLICATION# INDEX I I POLES I I PLAT LOGS I I LJ-MAPl I I I XFMR I I C-MAP I I I LOCATION MAP PAGE 5 so CA E� L E--- Clou�JT APTE-91 l�Jlq-1D U V - 9 0 n s I --f r/7 - 1/ 0 0 4- 0 Nc� Jn' P9-/2 14 3 0 17 V) rn pq 142 0 V-y �'l 7 AE50-24 dft F-0-p CO I L bS \P,/ AJ 'PO U- IZ-11 pvc-- ZDI-\D aDK-E:- D 0 BO Ll p9-/l 1185 A m F I li LDV STo JUL 2 3 1990 OPCEN/kse ECAS 074 PRIONTY F5zi� INSVC-0-i-;:5 jo F] DOR T— 1 P M 0 ,V"ou're onay A PERMITS CONSTRUCT10i�— TYPE APP. DATE DIALDIG (800-424-5566) Ej SNOHOMISH Co. BLANKET PERMIT Away 0 STATE El FLAGGING El BRUSHING COUNTY ENG TO STAKE CITY (24 HR NOTIFICATION) El El PLACE PEDS ON PROP Ej NONE El LINES SPECIAL CIRCUITS NONE CAUTION Frcma 0 SSCN DATE— POWER UG safety CUTS REQUIRED OTHER UTILITIES UG AER [:1 YES NO TELEPHONE UG [:1 Tl F.O.0 TELEPHONE AER IM Tl E] F.O.E] JOINT POLE JOINT TRENCH _--FEES-REQ'D PUD El PUD_ M, 211 GOP Ej LEl� El SPEC. CONST. El PSP&L El PSP&L POINT OF CONTACT El CATV— 0 CATV— A) 0 GTE El GTE -Z El — El 0 NONE 0— El RELATED WORK on DER 13 NONE No. NONE DATE ENGINEER CAj'ZL 5AMLj-CL,-)( PHONENo. SHEET OF I In L Lh -741 u + (o (0 - [-7 EML-�) LR -515 ZL END SECTION MAX E83RIDGE TAPi-&I -7 AML ALR . 0 C, LOOP L 'M FFICE LOOP LIMIT IbOO-a FIF-1 D 7E�--f Is C 4�7-L �MUFLSDKE -4-0 -zo S-HEET d OF I - ROUTINE WORK ORDER TITLE ,DI\D 1507�E m .- t04-95 ION .5 C)Lm-k co U$\VT y I EXCHA HOE NAR R ATIVE 1-, L t�r Ls AMID C-R0:551K16--:� EOT-'�-, A, ACCT MATERIAL C06E DESCRIPTION QUANTITY AC T. E ST. UNIT COST TOTAL COST OR; REMOVAL I MAINTENANC RETIREMENT 8 SALVAGE LABOR HOURS- C x M SCHEDULIN CREW EST. START JESTCOMPL SPLICE A C Tf 3 TA R T a Y A CT L�� CT. COMP. BY 2THER JPN NO. DATE APPLICATION NO, DATE W.O. PREP, Hy nAlF BY �DATE 0 A .RATIH9 S 011P 40 0 REG.