6517 170TH PL SW (2).PDF11111 ' 11
954
6517 170TH PL SW
NOTICE:
No warranty of accuracy.
The information shown on the attached map(s)
was compiled for use by the City of Edmonds,
its Employees and Consultants. The City of
Edmonds does not warrant the accuracy ot
anything set forth on these map(s). Any person
or entity requesting a copy should conduct an
independent inquiry regarding the information
shown on the map(s), including, but not limited
to, the location of any sewer stub shown. Such
sewer stubs may or may not exist and may or
may not exist at the location shown. Neither
the City of Edmonds nor its employees or
officers shall be liable for the information given
on map(s), nor for any one representation
provided based upon said map(s).
CITY OF EDMONDS - SIDE SEWER PERMIT
WATER -SEWER DEPARTMENT
PERMIT
Call 175-2525 for side sewer inspections BEFORE covering any Porkion of the construction.%
Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday inspections.j
ADDRESSLOCATION OF CONSTRUCTION ....... ---- — -- I ......................................... ...................... . .......... ........................ ...................
PROPERTY LEGAL DESCRIPTION ------- .........
......................... . .................................................................................
Q'n ................ .......................................................................................
........................... V ...................... ............................. a ..................................................
................................................................ OWNER AND/OR BUILDER._.�� --- S -------------------------- . .......................................................
CONTRACTOWS NAME & ADDRESS ------------------ ��__J_ A(A1_)C5rC -- ------------- ......... ...........................................................................................
---------- ---L-----_-_------
for repair and/or connection of a side sewer to the city sanitary sewer
Permission Is granted ........ . . ......... 197��
s%tem in accordance with'City of'�E_ ... d --- m"'o, n'ds, - 'o'_r,'d', in"'a"n ... O'c's.
A-�jOENTION IS CAM D TO THE FOLLOWING:
NOTE No. I —The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct
side sewer in street area. Do not cover any portion of sewer before it has been inspected.
NOTE No. 2—All work performed in city right-of-way requires an Invasion of Right -of -Way Permit obtainable from the City Engineer's office.
NOTE No. 3—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches inside property line; minimum grade of 2%. No bends in grade
sharper than % will be permitted.
NOTE No. 5—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to Improper
work which may develop within one year of completion.
NOTE No. 6--It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or its appurtenances except to in-
sert the pipe into the wye.
DISAPPROVEDE] Date _- - ----------------------------------- By ................ Date ------------------------------------ By ------------_- Date ............... - ------------------- 'BY ----------------
"PROVED Date ........ !i: . ...... ............. By.. ae! ------ - -- * --------- -------------- --------------------- * ----------------------------
Remarks: ...................... I ..................... . .................................................................... ......................................................................................................
— BOTH Permit Copies MUST Be Signed By Owner of Firm Performing Construction PRIOR To Request For Inspection —
I .......................................................... ............................ ... I hereby certify that the side sewer installation constructed under this permit
C-) (Owner of Contracting FIrm Performing Construction)
�. s installed in accordance with all governing ordinances of the City of Edmonds.
Datedthis ............................ day of ------------------------------------------------------------ --- 1 19 .........
V -V Check BEFORE you dig for: Water E], Gas E], Telephone [], Power E], Sewer E], Other F] V V
0 APPLICATION
The City of Edmonos-r,,-, for EASEMENT NO . ................................ ..........
SIDE SEWER PERMIT
NEW CONSTRUCTION N REPAIRS E LID NO. ....... ASMT. NO.
OWNER ------ — ------ . .......... I ................................... CONTRACTOR ..................................... PERMIT NO.
JOB ADDRESS ................................................................ ....... ............. LEGAL DESCRIPTION: LOT NO . ...................... --------------- BLOCK NO . ...................................
------------------------ -------------------------------------------- ----------------------------------------------------------- ................................
NAME OF ADDITION --- ......
.............
0
9
The City of Edmonds
APPUCATION
for
SIDE SEWER PERMff
NEW CONSTRUCTION F-1 REPAIRS F-1
OWNER---- ----------------------------------- : -----------------------
TOB ADDRESS -----------------
6j,
EASEMENT NO - --------------- -----------------------
LID NO - ---------- ------ . -ASMT. NO. � I ------------
CONTRACTOR ---------------- ------------------------------------------------------------------- PERMIT NO. 6F.26%..
LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------
------------------------------------- ---------------- -----------------------------------------------------------------------------------------------------
NAMEOF ADDITION ------------------------------------------------------------------------------------- ---------------------------------
113
N
Approved:
DATE--
--- Dy --
REGARDING: 6517 - 170th Place S.W. _`?no -03/60
(address)
R E C 0 R D 0 F C 0 N T A C T S
DATE NAME, PHONE NO., & COMMENTS ACTION TAKEN
ADDRESS of CALLER INITIALS
7/17/7S Alvin Moore Certified Letter No. 406703 sent Letter received. JT
requiring hook-up within 60 days.
8/7/7S Mr. Moore came into the office and JT
obtained permit #5285.
9/8/75 Mr. Moore called for an inspection. Disapproved. JT
9/29/75 Connection c=Qleted. JT
Ui
LL.
`V R- PERMIT
CITY..`),,---,EDM0NDS - SIDE r "
WATER -SEWER DEPARTMENT�
rip PERMIT N? 15285
Call 775-2525 for side sewer Inspections BEFORE covering any portion of the construction.)
Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday Inspections.
ADDRESS LOCATION OF CONSTRUCTION ........ <( .. ......
..............................................
PROPERTY LEGAL DESCRIPTION ......... . ................ ..... ...... ....... .................. .1 . . . . ........................................................
............ ukca ..........
....... I .. . ..... tV1.0 ....... Kk) ....... ........................................................................ ..............................
........................................ ........................... I .......................................................
....................... OWNER AND/OR BUILDER ..... U . . ........ V64n 0Y.
CONTRACTOR'S NAME ............... 1��.
'0A ..................................................................................................................
%ADDRESS ...
Permission Is gran ......... ................ 19 for repair and/or connection of a side sewer to the city sanitary sewer
system in accordance with"45ity of lEdmonds ordinances.
ATTENTION IS CALLED TO THE FOLLOWING:
NOTE No. 1—The o ners of the
w property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct
side sewer in street area. Do not cover any portion of sewer before it has been inspected.
NOTE No. 2—All work performed in city right-of-way requires an Invasion of RJght-of-Way Permit obtainable from the City Engineer's 'office.
NOTE No. 3—Obtain full information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 4—Top of side -sewer must have at least 30 Inches coverage at propert - y line and 12 inches inside property line; mini - mum grade of 2%. No bends in grade
sharper than % will be permitted. .
NOTE No. &--Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper
work which may develop within one year of completion.
NOTE) No. 6—It is unlawful to alter or do any other work than is provided for in the permit, or to do any work on the main sewer or Its appurtenances except to in-
sert the pipe Into the wye.
DISAPPROVEDr-1 Date ........................................ By ................ Date .................................... By ................ Date .................................... By ................
APPROVED(] Date ................................................................ By ........................................... . .......................................................................................
Remarks: ........ ................................................................................................................................................................................................................
..................................................................... . .....................................................................................................................................................................................
BOTH Permit Copies MUST Be Signed By Owner of Firm Performing Construction PRIOR To Request For Inspection
....................................................................................... ... I hereby certify that the side sewer installation constructed under this permit
(Owner of Contracting Firm Performing construction)
was installed in accordance with all governing ordinances of the City of Edmonds.
Datedthis ............................ day of ............................................................ .... 19 .........
Check BEFORE you dig for: Water E], Gas E], Telephone E], Power E], Sewer E], Other E] V
4? . ....... ....... ,
4
T,
21.
a
0,
0
0. vi� J,
=L
(0
U) ;;-4. c), :,z ro
Or
> vg,
��E- 4— —M. 0,
M* <
0 "M
:,4
I -VI
-Q),
t:0
0
Q
U, 'CIS, CO.-, I E- co
3.2
Wj
z. I 0, jo� ILL[
IUJ;.t,
01 0 0", 0(n Af)..
0
X" av W
CL ii `r"4 W, U)"= CL
w64
rwh
(4* 4J`
u<.
"I
A- 0,-�
0
I:4:� 0- wi.'o: !,W
C/) -Q 1. mjl 'ZI
1,0
� 1,;. —,
lLjjj
Wj; +
pro,, z
Ilk.
0
P. F iffl; -19,1311
—1811; IN16y. '--RETj(J'RNfi
,-�REGISTIER
S REE), �ANP�'CEffTkFIED`,y�iL
RECEIPT FOR CERTIFIED MAIL-30�
(plus
postage)
SENT TO
POSTMARK
Mr. or Mrs. Alvin 'S. Moore
Oil DATE
STREET AND NO.
--6S17
170th Place S.W.
c
P.O., STATE AND ZIP CODE
Edmonds, Washington 98020
CJ5
CD
OPTIONAL SERVICES FOR ADDITIONAL FEES
RET URN
1. Shows t,0 whom and date delivered
Wit I delivery to addre sser� n
o ly
15?---
RECEIPT
_
2. Shows to whom, date and where delivered
>
SERVICES
With delivery to addressee only ...........
850.
DELIVER TO ADDRESSEE ONLY
50d
SPECIAL DELIVERY (extra fee
equirad)
PS Form 3800 NO INSURANCE COVERAGE PROVIDED—
(See othor side)
Apr. 1971 NOT FOR INTERNATIONAL MAIL
QP0: 1070 0-397-4U0