Loading...
665 EDMONDS WAY.PDFiiiiiiiiii lill 11060 665 EDMONDS WAY ADDRESS: 665 LMONAs WLA TAX ACCOUNTIPARCEL NUMBER: 210S225003080aD BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS:— Oil 617'-; DETERMINATION: [-]Conditional Waiver F] Study Required, Maiver DISCRETIONARY PERMIT #'S: DRAINAGE. PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: M110% ", lAJ 1600,114 1 � 'P A=w0�0-N-WIR -- OR PLANNING DATA CHECKLIST DATED: SCALED PLOT PLAN DATED: SEWER LID FEE $: LID #: SHORT PLAT FILE: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: GEOTECH REPORYDA STREET USE / ENCROACHMENT PERMIT #: FOR: WATER METER TAP CARD DA: LOT: BLOCK: LATEMP\DSrs\Fomis\Strcet File Checklist.doc Ctt? of (1b. pub DEPARTMENT OF BUILDINGS / flo6L F P At: 665 Edmonds Way AF . f Occupancy established by this, certificate: E Intemational Building Code Section ii'O�6, —Building -Permit Dwelling Units: **N/A** Jyp�ICqnstrup�lon: VB A; -A - 4T�: MaximuJlOccupanLoad. Room capa6iti'signs,-wvhne'nirie(16ir&drm7u%*ti'r,-'e'"m'ai'n.pb'st&d, Building Owner: Edmonds Way Profestiohal.I.Centdr THE Grow With Us Daycare EDITION OF THE INTERNATIONAL BUILDING COD&_ iZXD( FOR WHICH THE PROPOSED OCCUPANCY IS 6 bYS-60"E'D. Issued this 31 st FICIAL BLD2010-0248 INo. Stories: I Basement: No IBC 1004) , .8- 99 #F-502, Edmonds, WA 98026 y WG WITH THE REQUIREMENTS OF THE 2006 0 AND DIVISION OF OCCUPANCY AND THE USE BY: This certificate shall be posted in a conspicuous public area and shall not be removed, mutilated or obscured and shall be maintained in �Ie condition at all times. Any change of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. qk 0 PLANNING DATA 0 1 FILE I -- Sign5 -- Name: I S 6 Ire, L-i Date: --LP Site Address: � 6 �— E-) ,,e J Plan Check #: BLD-200V&�-L/ Project Description: VJIA� k INA 01�,Iltrlj Reduced Site Plan Provided: (0/ NO) Zoning: Comprehensive Plan Designation -%is" wes�,tk (00) —[Corner V�A-e, 9 Map Page: Lot: (YES [Flag Lot: (YES ADB File (or date waived): TOTAL Area Per Type of Type of Sign Allowed in Matrix conditions Allowed area per Unit TOTAL sign area Proposed zone? met? unit allowed for sign area this sign ExafnPle Wall wlinternal &W7708tIon Yes WIth conditlons Yes I sq. t1111neal ff. attached 41 ft. attached wall 41 square feet 20 square feet Wa/1 Sign # I ip PW- I �,, �t;- U\�� 0 Sign #2 fw Y\.-J Sign #3 TO TA L Sig n A rea fo r Tena n tlSite Max Permitted: —Tprevious Total: Proposed Total: Sign Height Sign Type: Max Permitted: I %I Actual Height: Sign Type: . 3 Max Per'mitted. Actual Height: Sign Type: Max Permitted: Actual Height: Sgn.Lighting Sign Type: Propo sed: KV VA Allowed in Zone: Sign Type: Proposed: v, 0 V-0- Allowed in Zone: 1� 0 0 PLANNING DATA -- Signs -- 11 STREET Sign Color5 Proposed: -N?\ Acceptable? 144AA-k, [Requires ADB Approval? k 6 Sign, Location If freestanding and 3-feet or over (unless a fence) meets setbacks? J- 3 Required Setbacks Street: Side: Side: Rear: Actual5i��cks Street: Side: r: ij�of for. ���i�nd�i. Sign.� Size: Location: Critical Areas Determination ff: 11 Study Required El Waiver Other Plan Review By: PLANNING DATA STREET FILE New Commercial I Multi -Family Projects 8 Name: Date: 5 4,4.,c / Site Address: '1qAO Plan Check#: BLD_-'�OkC)_Oi%C' Project Description: ke,,ockl ex-r6A-, c�n-a� e- 42e- 4o <95; M, la, Z?-. 4. Z� Use(s) Proposed: Allowed Use-_(0) NO) 'D, '4' �'_ C_U 9 CUP File Number- CQ / 09-3,R To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES (�N Reduced Site Plan Provided��NO) Zoning: 'Cle-c-N2� Map Page: Comp Plan Designation: Pkla,-�ed Q'wa'�' 9 Corner Lot: (YE S/ Flag Lot: (YEEJL�Q ADB File Number (date waived): _LotA rea: Plans Match ADB Approved: GDNO� Shoreline Required: (YES 40—P Critical Areas Determination #:C9,A-,�,pO-+CC)t73 El Study Required 0 Waiver SEPA Determination: Exec.,k Exempt - q f.,opo- ,ec/ keeeAl-.. 6cc)c-y El bl"g-M Ati, 0 Vre %rf*u' ^o3afJ—Fe&' 94RIO, Needed (fo c yy art" n 2 e t UR Ballinger. Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). St Side: Side: 4" CA- ki r,'e_'-' LRea AID _= -A Street - e, Side_�,,, Rear: Lot Coverage/FAR Required: Norve, Lot Coverage/FAR Provided: AJIA Lot Coverage/FAR Calculations: N /A Building, ffei4h t Datum Point: Datum Elevation: c.o(-r,,e_r- nP s'-Ae- Maximum Height:ps Actual Height: Subdivision: Lot Aggregation Required: No. _L?nd.4040ing- Landscaping Matches ADB Approved: Landscaping Bid Provided: C(YE §)NO) Bond Amount (I.W �.id):TJS'b 'V Ir Plan Review B e'.X� *'We '. E-b4 S%de_ Vo tc� -\O �Occ/ r1doq- �Y_ 4,o n4' t"e-relse- 4Vie- 0 0 PLANNING DATA New Commercial / Multi -Family Projects II =FILE I Commercial ParNn A nolysis Business Name Type/Use Parking Ratio Tenant Area Required Parking f WS % rotal Parking Reqtdred. I q Total Parking Pro vided: MUM # Bedrooms per Dwelling Unit Parking Ratio # Units Required Parking Studio 1.21D.U. 1 Bedroom 1.51D.U. 2 Bedrooms 1.8/D.U. r 3 + Bedrooms 2.0/D.U. Total Parking Required. Total Parking Provided: Other., srv.� Plan Review 13>�. 0 PLANNING DATA 0 New Commercial I Multi -Family Projects rw Name: Da *�(c .Site Address: Plan Check#: BLD - loog'-C96,r t -7 5-- W6V U Project Descr iption: NVAJ 04_-('Ct, 6-J, 1 d(a) LAJ / PCV (r\� Use(s) Proposed: 0 flowed Use: (Yol NO) CUP File Number: 1011- To Allow What Uses: Legal Nonconforming Land Use Determination Issued: (YES / 1,05) Reduced Site Plan Provided: (YES 10 Zoning.- 6 P Map Page: to Comp Plan Designation-. Corner Lot: (YES Flag Lot: (YES W U 4, Y/0�- ADO File Num ber(date-veaived):/4--Vt'-(D�'—I Lot Area: Plans Match ADO Approved: ACE�)NO) Shoreline Required: (YES Critical Areas Determination #-. El Study Required K-Waiver SEPA Determination. - Exempt breeded (for sites with 500 cubic yards of grading or within 200 feet of Puget Sound or Lake Ballinger- Requires: (1) Fee, (2) Environmental Checklist, and (3) APO List with notarized form). f;?�64uzr ed-Setback,5 / . 'i d__ 4,4 _00"Ot Side. Street: E - r 5W Alw Alorl� Acft�alSethacks Street: Side: Side: G Rear. - Lot CoverageAW Required: , 1104 Lot Coverage/104kProvided: Lot I CoverageW,'A" Calculations: 6ull4j, 3,-7 BuddingW_-�Vht Datum Point: /V Datum Elevation: 2-3 q, Maximum Height: -2-) Subdivision: Lot Aggregation Required: Landscaping Matches ADB Approved: pe"Jist Landscaping Bid Provided: (YES t9) /� i I Bond Amoul(100% Bid): (tic e t vv 1) Plan Review By- 0 PLANNING DATA New Commercial I Multi -Family Projects Business Name Type/Use Parking Ratio Tenant Area Required Parking 0A 0 ice- rotal Parking Required: Fotal Parking Provided: Multi r�pa*i" # Bedrooms per Dwelling Unit king Ratio �ar # Units d#f Re red ! -C ;apr k�n, 1 Studio 1-214-U- z I Bedroom 2 Bedroomx"', 1-8 D.U_ 3 + Be9 /OOMS 2. D.U_ ro�aZfarking Required-- "0 IParking Provided: PIA f �5 M- crdc_� Plan Review By:R_I 2) �cj 3) ftu �Yult -<I r4-d Olf Otl I L4 �C�PerlCv7 4 C_ k U " 15 , ,-) 1 1/3ro/og' 6,0� Wo fy.AW ,,n 5-. P_ *_ eA #P20 CA File No:QRA-�M7-Coc?-� Critical Areas Checklist Site Information (soils/ topography/ hydrology/vegetation) 2. 3. 4. '61 0 7. Site Address/ Location: Property Tax Account N Approximate Site Size (acres or square feet).- 17113 -3 4�+- V Is this site currently developed? V yes; — no. !A M. ItO ��Jt ff yes; how is site developed? 16LL IS. 0- 5 i e (A C C2 le- 4 Describe the general site topography. Check all that apply. 'X Flat less than 5-feet elevation'diange over entire site.. Rolling- slopes on site generally less than 15% (a vertical rise of 10-feet over a horizontal distance of 66-feet). Hilly: slopes present on site of more than 15% and less than 30% (a vertical rise of 10-feet over. a horizontal distance of 33 to 66-feet). Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a horizontal distance of less than 33-feet). Other (please describe): Site contains areas of year-round standing water: ; Approx. Depth: Site contains areas of seasonal standing water: NP Approx� Depth: What season(s) of the year? 8. Site is in the floodway 0 D floodplain of a watercourse. 9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-round? 0 Flows are seasonal? (What time of year? 10. Site is primarily: forested— . ;meadow ;shrubs n-dxed V urban landscaped (1awn, shrubs etc) 11. Obvious wetland is present on site: 1. 2. 3. 4. S. For City Staff Use Only Plan Check Number, if applicable? - YA Site is Zoned? P SCS mapped soil ty;e(s)? 0 — C—vej—cff qrLx� 5-0"c& 1,c, m Q— Y 010 s-topp Critical Areas inventory or C.A. map indicates Critical Area on site? Mq'L�Q' Site within designated earth subsidence landslide hazard area? DETERMINATION 0 Reviewedby.2k. A WAIVER "0C. 1 %9%) #P20 � 0 City. of Edmonds Development Services Department Planning Division Phone: 425.771.0220 Fax: 425.771.0221 The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application.for the City of Edmonds prior to his/her submittal of the application to the City. The purpose of the Checklist is to enable Cit y staff to determine whether any potential Critical Areas are, or may be, present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical areas inventories, maps, 'or soil surveys). DateReceived: 9 City Receipt 5�L�l Critical Areas File #: Cp- Critical Areas Checklist Fee: $135.00 Date Mailed to Applicant: A property owner, or his/her authorized representative, must fill out the checklist,- sign and date it, and submit it to the City. The City will review the checklist,.make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. Please submit a vicinity map, along with the signed copy of this form to assist City staff in findifig and locating the specific piece of property described on this form.. In addition, the applicant shall include other pertinent information (e.g. site plan, topography map, etc.) or studies in conjunction with this Checklist to assistant staff in completing their preliminary assessment of the site. The undersign ed applicant, and his/bff/its heirs, and assigns,'in consideration on the processing of the application agrees to release, indemnify, defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any action or infraction based in whole or part upon false, misleading, inaccurate or. incomplete information finnished by the applicant, his/herlits agents or employees. By my signature, I certify that the information and e.xhibits herewith submitted are true and correct to the best of my knowledge and that I am authorized to file this appliy�#�n on the behalf of the owner as listed below. SIGNATURE oF APPLicANT/AGENT DATE 6 6 AS- /0 ;;;" Property Owner's Authoriza(l��o k_-- By my signature, I certify that I have authorized the above Applicant/Agent to apply for the subject land use application, and grant my permission for the public officials and the staff of the City of Edmonds to enter the subject property for the purposes of inspection and posting attendant to this application. PLEASE PRINT CLEARLY Owner/Applicant: Applicant Representative: UeA \�Q- D- :Yo-,i 5 e- n Name Name FNIA S-o-L 2-�(..�2-gwyjq 5TF--F- Street Address TZM0xQ3 U A city State Zip Street Address F--S M017 City State Zip Telephone: Y� S- - 7-7 3 S-kS Telephone: t/?-.5-- 77'?- - Z q ZS- Email address (optional)- te)!2 Oeo mm4-ne,�Ernail Address (optional):..; ( o��iTod e I -se /I ,j� ctil s e DEPARTMENT OF BUILDINGS PER International Building Cod �ectionlfo At: 665 Edmonds Way --Build"ng-Perrni1\;0 BLD2010-0248 No. Stories: I Occupancy established by this,.6ertificate: Dwelling'Units: **N/A** E ,,�."I�,�Typg,3Con.4frubtioh:-. V6 Basement: No I.BC 1004) Maxirnurntjq'cco0.orq F? whd —,it.remain"posted-at 61i times. Room qapaqJty-�Jghs;. -&req'ivired mu, 64' -Ce: 23631�-Ai h'� Building Owner: Edmonds Way Professlonai'-� whers rgsi.- z wa V 99 #F-502, Edmonds, WA 98026 W&WS MPLYING WITH -�JH E !REQUJI REM E NTS OF THE 2006 THE Grow With Us'Daycare HAS -Cb EDITION OF THE INTERNATIONAL BUILDING �CODE.i��.XDOP',T,'E6�BY-THE'CITY FqRT-HE GROUP AND DIVISION OF OCCUPANCY AND THE USE FOR WHICH THE PROPOSED OCCUPANCY IS CLASSIFIED. t Issued this 31 1 day -Of- 2 0-11 IA-L BY: This certificate shall be posted in a conspicuous public area and shall not be removed, mutilated or obscured and shall be maintain �in I eg condition at all times. Any change' of occupancy or use requires a building permit and a new Certificate of Occupancy issued by the City of Edmonds Building Official. assesses a a, F— 101 Uty Of EdMolMdo 19720 44th Ave. Suite H, Lynnwood, WA 98036 Phone: 425-672-3706 Fax: 425-672-3708 nn, v Signs@SeattleSigns.com Proof Date: 4/8/2011 File: 40412.FS D Med Grey 195—L 0 Reflux Blue White F� Metallic Gold Black M ff ff z - 9 % N ay pLANNING P IBOVEU I, --4 4dl Vj;q11 1.410�fijC CITY OF EDMONDS BULQn�,'G -E'.�'EPARTMENT WORK �Q ADDRI�E�o OWNER �4o 4!�= APPR0VE1)2;-"-7— AL 3LDG. 0F7.:C:.^L 0 0 we ION n=PUE REM It 44 incMW -mu4k M&-e- - APR 18 2011 SD-X�rol'r' NOV 17 2911 IV14htj--j*q-vj� BUILDING DEP�Q!NkTSIK "Lt" �-AUILDINQ DEPARTM CITY OF SIDMONC This layout is property of Speedy Sign Center. Reproduction of this material is forbidden. If produced by anyone other than Speedy Sign Center without consent client will be required to pay for any design fime accrued. Important: Please do I check I layout above for accuracy including spelling as your sign(s) will be In MEET FILE 1/+ 0 0 APPRUVED AS NOTED BY ENUNEERING. - zo-:Um 5co- A - i A - Date: —AILI 11 Stetw S".LL TV- L6MTE�b in-rrlv.vLq 6 N Ts4vm Tj t4 'rD CftKre, Ar SWrWr 1;ncrimee *42M 4;b� v*W-LxT-- 19�4111% ?M=96 AP*4- incAaded 14 41s o( tj -0 1 vk Tr RECEIVEE) . APR - 8 201, DEVELOP MENT SERVICES CTR. CITY OF EDMONDS 7-/f - 0 E ------------------ ----------------- RECEIVED APR - 8 2011 DEVELOPMENT sffMCES CTFL CITY OF EDMONDS Harrison, Marie From: Scott Andersen [scott309@com cast. net] Sent: Friday, April 08, 2011 3:23 PM To: jdjansen56@comcast.net; Harrison, Marie Subject: Re: Sign application bId2011024.1 The bolts anchoring the building mounted sign to the wall will be 6 lag bolts 5/16ths diameter x 2inch long (1 in each corner and 2 in the middle edges top and bottom). The street sign will have pressure treated 4"x4" posts on either side concreted into ground (2ft deep) and the sign will sit in between the posts fastened by 6, 6 inch long lag bolts 5/16th in diameter. The posts will have decorative post caps and the post will be as tall as the sign. Please let me know if you have any other questions. Thank you. Best regards, Scott Andersen 4257722640 Connected by MOTOBLUR TM on T-Mobile ----- Original message ----- From: idiansen56(cDcomcast. net To: Scott Andersen <scott309(@co m cast. net> Sent: Fri, Apr 8, 2011 14:59:51 PDT Subject: Fw: Sign application bld201102411 Sent via BlackBerry from T-Mobile From: "Harrison, Marie" <Harrison2ci.edmonds.wa.us> Date: Fri, 8 Apr 2011 14:55:15 -0700 To: <JDJANSEN56a ,COMCAST.NET> Subject: Sign application bld20110241 4e- 4 W, Q Hello Jeanie: I just noticed that you did not provide any footing details for the sign. Also there is no detail showing how the wall sign will be attached. Please provide this information. CITY OF EDMO 121 5h Avenue North Edmonds, WA 98020 Phone: 425.771.0220 Fax: 425.771.0221 - Web: www.ci.edmonds.wa DEVELOPMENT SERVICEs DEPARTMENT: PLANNfNG DiviSION ADMINISTRATIVE DESIGN REVIEW BUILDING PERMIT REVISION #1 STAFF DECISION TO: Scott Anderson, Grow With Us Learning Center FROM: Jen Machuga, Planner DATE: March 2, 2011 FILE: BLD20100248 (Revision #1) BLD20100248 Revision #1 Proposal. A building permit (BLD20100248) was issued in September 20 10 for the remodeling of an existing single-family residence, change in use to a daycare facility, and construction of an addition of approximately 852 square feet on the north side of the existing building. The permit included paving and striping of a new parking lot and a landscaping plan for the entire site. Administrative design review was conducted concurrently with the building permit review, and staff issued administrative approval of the project design on September 8, 2010. Following the initial design review approval and issuance of the building permit, the applicant wanted to make changes to the landscape plan as well as a few changes to sidewalk access to the building. Thus, a revision (Revision #1) to the issued building permit was submitted on February 15, 2011. Staff sent the applicant questions on the proposed revision on February 23, 2010, and in response, the applicant added plants to the revised landscape plan on February 24, 2010. As part of Revision # 1, the applicant has proposed to eliminate the portion of the five-foot concrete sidewalk adjacent to parking stalls #10 and #11. Also, the applicant has proposed to relocate the walkway that serve's the side entrance at the northeast comer of the addition to follow the eastern side of the building instead of being separated from the building by a landscaped area. Additionally, numerous changes were proposed to the landscape plan. Staff s analysis of the proposed changes associated with Revision #I follows. OwnerlApplicant. Scott Anderson Grow With Us Learning Centers 23632 Highway 99, Suite F — PMB 502 Edmonds, WA 98026 Page I of 5 File No. BLD20100248 "Grow With Us" Daycare Administrative Design Review — Revision #I Design Review Process: As part of the City's review of the original building permit application (BLD20100248), staff design review was required per ECDC 20. 10. The proposal is located within the Planned Business (BP) zone, which is not an area of the City that is specifically designated for District -Based Design Review. Therefore, the proposal is subject to the General Design Review requirements of ECDC 20.11. Projects that remain under the SEPA threshold are reviewed by staff with the building permit, and the design review is considered an administrative Staff Decision subject to the requirements of ECDC 20.11 (General Design Review) and 20.01 (Type I Staff Decision —No Notice Required). Because the project is located in the BP zone, the design standards in ECDC 20.11.030 apply in addition to the general design objectives of the Comprehensive Plan. Staff design review with a building permit is considered a Type I decision sub9ect to the requirements of ECDC 20.01.003. The project was determined to be exempt from the State Environmental Policy Act (SEPA) under WAC 1.97-11-800(3). A critical areas checklist was submitted in 2007 and a waiver from further study was granted (File No. CRA20070093). Since the design review process for the project was originally administrative, design review of the proposed revisions is also administrative. The subject staff report only addresses the proposed changes from the original design review approval issued on September 8, 2010. Refer to the staff report issued on September 8, 20 10 for staff s complete analysis. of all applicable code sections for the entire project. The subject report only addresses the code sections applicable to Revision # 1. Edmonds Community Development Code (ECDC) Compliance: A. ECDC 20.11 (General Design Review) The proposal is subject to the General Design Review criteria of ECDC 20.11.030, which include criteria for building design and site treatment. With the changes proposed through Revision #1, the project will still be consistent with the criteria applicable to site treatment in that approximately nine of the existing evergreen trees will be retained on the site, sufficient landscaping is provided around the front and all sides of the site to assist in buffering the building from surrounding properties and curbing will be provided to protect the majority of the landscaped areas. B. ECDC 20.13 (Landscaping Requirements) The applicant has proposed several revisions to the approved landscape plan. These revisions include changes to the majority of the proposed tree and shrub species as well as changes to locations of many of these plants. Due to the extent of the proposed revisions to the approved landscape plan, Revision 91 will be reviewed entirely on its own for compliance with the landscaping requirements of ECDC 20.13 instead of addressing each proposed change from the approved plan individually. The subject site contains several large existing evergreen trees. Many of these trees are located in areas that cannot be protected during development due to the need to locate the parking area at the front of the building. However, approximately nine existing trees are indicated on the plans as to be retained. These existing trees will provide a good base to the proposed additional landscaping. It should be noted that the existing trees to be retained as shown on the revised landscape plan are the same as those shown on the approved landscape plan. The City's Street Tree Plan requires street trees adjacent to Edmonds Way. The landscape plan indicates four Cercidiphyllumjaponicum (Katsura) trees adjacent to the southwestern property line. These trees are shown to comply with the minimum required size of 3" caliper and the maximum allowed spacing of 40 to 60 feet on center. The applicant has indicated that the Katsura. tree on the east side of the vehicular exit from the site may need to be moved to the east Page 2 of 5 File No. BLD20100248 "Grow With Us" Daycare Administrative Design Review — Revision # I slightly in order to avoid conflict with utility lines. This will be acceptable, as the total number and spacing of the street trees will still comply with the requirements of the City's Street Tree Plan. ECDC 20.13.030 requires Type IV landscaping along the southwestern side of the subject site in order to provide a visual separation from the street where clear sight distance is required. The proposed landscaping between the parking area and Edmonds Way includes the street trees discussed above as well as Acerpalmatum (Japanese maple) trees near the center of this property line and a cluster of existing evergreens near the southern comer of the site. These trees are consistent with the Type IV landscaping requirement for trees to be planted 25 feet on center. The Type IV landscaping requirernents also specify that all trees shall be free of branches below six feet in height, which has been added as a condition of approval. Various shrubs including Prunus laurocerasus 'Otto Luyken'(Otto luyken laurel), Rex crenata convex * a (Japanese holly), Festuca glauca (blue fescue), Euonymusfortunei (emerald gaiety), and Euonymusjaponica (golden euonymus) are also indicated within the Type IV landscape area. These shrubs will need to be maintained at a maximum height of 3.5 feet where clear sight distance is necessary. A condition to this effect has been added to the approval to ensure proper maintenance of the Type IV vegetation in order for clear sight distance to be maintained. ECDC 20.13.030 requires Type V landscaping to provide visual relief and shade within parking areas. If the parking area contains no more than 50 parking stalls, at least 17.5 square feet of landscape development must be provided for each parking stall proposed. Thus, with a total of 14 parking stalls, the applicant is required to provide at least 245 square feet of Type V landscaping within the parking area. The revised landscape plan indicates Type V landscaping within the landscape areas surrounding the parking lot, exceeding 245 square feet in total area. ECDC 20.13.030 requires Type 11 landscaping to be provided along the northwestern property line. Type 11 landscaping is intended to create a visual separation between similar uses, and includes the requirement for evergreen and deciduous trees, with no more than 30 percent being deciduous, a minimum of six feet in height, and planted at intervals no greater than 20 feet on center in addition to shrubs a minimum of 3.5 feet in height at maturity to cover the ground within three years. A combination of existing evergreen trees and new Chamaecyparis obtusa (hinoki) and Acerpalmatum (Japanese maple) trees will be provided along the northwestern property line. Although there are areas where the trees are slightly more than 20 feet apart, this is compensated for by the cluster of existing trees being retained near the southwestern comer of the existing building, and the average distribution complies with the requirement for the trees to be planted at 20 feet on center. In. addition to the proposed trees, the revised plans indicate a combination of shrubs including Rex crenata convexa (Japanese holly), Prunus lau�ocerasus 'Otto Luyken'(Otto luyken laurel), Rhododendron (purple gem rhododendron), and Euonymus japonica (golden euonymus). These shrubs comply with the requirement for a minimum height at maturity of 3.5 feet. This combination of shrubs and trees will sufficiently comply with the Type 11 landscaping requirements. ECDC 20.13.030 requires a combination of Types I and 11 landscaping along the portion of the eastern property line adjacent to the residentially zoned property, as Type I landscaping is intended to provide a very dense sight barrier between significantly separate uses and Type 11 is intended to provide separation between similar uses. The daycare center and adjacent residential property are not significantly separate uses, but they are not quite as similar as Type 11 landscaping calls for. Thus, the landscape plan was required to show a combination of deciduous and evergreen trees planted at 20 feet on center as well as shrubs a minimum of 3.5 feet high at maturity to provide sufficient coverage of the ground within three years. The applicant has proposed to retain some of the existing evergreen trees along the eastern property line and plans to supplement these trees with new Chamaecyparis obtusa (hinoki) and Acer palmatum (Japanese maple) trees. The majority of the trees along the eastern property line will be evergreen, which Page 3 of 5 File No. BLD20100248 "Grow With Us" Daycare Administrative Design Review — Revision #I complies with the requirement for no more than 30 percent to be deciduous of Type II landscaping and ties in the requirement of Type I landscaping to include evergreen trees. The overall spacing of the trees along the eastern property line more than complies with the requirement for the trees to be spaced at no more than 20 feet on center, as some of the trees are clustered much closer together. The applicant incorporates the fencing requirement of Type I landscaping by including a six-foot fence along the eastern property line, which will provide additional screening from the adjacent R-zoned property. The proposal includes various shrubs along the eastern property line, including flex crenata convexa (Japanese holly), Prunus laurocerasus 'Otto Luyken'(Otto luyken laurel), Rhododendron (purple gem rhododendron), Euonymusjaponica (golden euonymus), and Pierisjaponica (Japanese pieris). These shrubs comply with the requirement for a minimum height at maturity of 3.5 feet. This combination of shrubs and trees complies with the Type 1/11 landscaping requirement for the eastern property line. Pursuant to ECDC 20.13.020.E, "automatic irrigation is required for all ADB-approved landscaped areas for projects which have more than four dwelling units, 4,000 square feet of building area or more than 20 parking spaces." Because the proposal does not trigger SEPA review, automatic irrigation is not a requirement. A condition of approval has been added requiring all tree and plant sizes and spacing to be consistent with the minimum size and maximum spacing requirements of ECDC 20.13.015 and the City's Street Tree Plan. Additionally, ECDC 20.13.020.13 requires four to six inch extruded curbs where landscaping meets paved areas. Thus ' 'in the area where the sidewalk is proposed to be removed adjacent to parking stalls # 10 and # I I, the applicant must provide an extruded curb between the pavement of these parking stalls and the landscaping. This has been added as a condition of approval. With this condition of approval, the changes to the sidewalk surrounding the building requested under Revision #1 will not impact any other requirements of the Planning Division. Comprehensive Plan: The subject site is located within the "Planned Business/Neighborhood Business" designation of the Comprehensive Plan. Additionally, the site is locatedwithin the "Westgate Corridor." The proposal is subject to the applicable general objectives for urban design located on pages 90 through 98 of the Comprehensive Plan. These objectives were addressed in staffs original design review approval issued on September 8, 2010. The proposed changes as part of Revision #1 will not impact the project's compliance with the design objectives of the Comprehensive Plan discussed in staff s original design review decision. Findings & Conclusions: In accordance with the requirements ofECDC 20.11.020 and 20.11.030, the proposal has been found to be in compliance with the design criteria of the Comprehensive Plan, the bulk and use requirements of the zoning ordinance, and the building design and site treatment criteria applicable to general design review. Detailed discussion on compliance with these requirements can be found in the sections above as well as in the original staff issued on September 8, 2010. Technical Review: The Engineering Division, Building Division, and Fire Department have reviewed the proposed revisions to the building permit (File No. BLD20100248). Any comments from these departments will be provided as part of their review of Revision # 1. Page 4 of 5 0 File No. BLD20100248 "Grow With Us" Daycare Administrative Design Review — Revision #I Public Comments: Projects that remain under the SEPA threshold are reviewed by staff with the building permit, and the design review is considered an administrative Staff Decision (Type 1) subject to the requirements of ECDC 20.11 (General Design Review) and 20.01 (Staff Decision — No Notice Required). Therefore, no public notice was required for the subject application. The City has not received any comment letters for this project. Decision Staff finds that with the conditions below, the proposed revisions to the issued building permit are consistent with design criteria in the Comprehensive Plan as well as the Edmonds Community Development Code, specifically ECDC 20.11,030. Therefore, staff finds that Revision #1 to building permit BLD20100248 is APPROVED with the following conditions: I . Individual elements of this project are required to meet all applicable city codes, and it is the responsibility of the applicant to apply for and obtain all necessary permits. 2. Tree and plant sizes and spacing shall comply with minimum sizes and maximum spacing of ECDC 20.13.015 and the City's Street Tree Plan. 3. Trees within the Type IV landscaping area (adjacent to the southwestern property line) shall be free of branches below six feet in height, and shrubs within this area shall be maintained at a maximum height of 3.5 feet. 4. An extruded curb four to six inches in height must be installed between parking stalls #10 and #I I and the landscaping area pursuant to the requirements of ECDC 20.13.020.D. I have reviewed the application for compliance with the Edmonds Community Development Code. Machuga, Appeals March 2, 2011 Date Design review decisions by staff are only appealable to the extent that the applicable building permit or development approval is an appealable decision under the provisions of the ECDC. Design review by staff is not in itself an appealable decision. Page 5 of 5 In a4e 9� @ H T 93 _/_�A F F 0 C 0-5 H 9� U0 L V �i\ P,\Pi V (0' TRAFFIC ENGINEERING * TRANSPORTATION PLANNING 2802 WETMORE AVE. - SUITE 220 - EVERETT, WA 98201 - PH: (425) 339-8266 - FAX: 14251258-2922 August 6, 2009 RECEIVED APR - 6 2010 AUG Mr. Dave Gebert, P.E. DEVELOPMENT SEROCES CTFL 6 City of Edmonds C11Y OF EDMONDS Pt.ANA(/N(3 121 5h Avenue N Edmonds, WA 98020 ARMUIRU AS NOTED BY' ENGINEER `G Re: Grow with Us Day'care — 49 Student Daycare on Edmonds Wayqo*"— Updated Traffic Impact Analysis, GTC #09-079 A. . 51& & r)nf'-- Ob Z12 ,0240110,030 W2400'248 Gibson Traffic Consultants (GTC) is providing updated text to address comments from the City of Edmonds pertaining to a discrepancy -in Table I and credit for the exist' i ing single-family residence- We have included the other* �s`ections of the report for consistency with the original report. This study has been organized in the mariner of the SEPA Traffic Impact Requirements for the City of Edmonds for developments generating Z:1 less than 25 PM peak -hour trips. DEVELOPMENT SITE DESCRIPTION The Grow with Us daycare is proposed to remodel an existing single-family residential unit and construct an 832 square foot (SF) addition. The daycare is proposed to total 2,273 SF of daycare that will be approved for 49 students. The development site Is located at 665 Edmonds Way in Edmonds, Washington. The proposed development ' Is anticipated to be occupied in 2010. The development is proposed to have two one' -way access points, one each for inbound and outbound traffic. The outbound access will be the farthest from the signalized intersection of Edmonds Way at 226th Street SW. TRIP GENERATION Trip generation rates were obtained from the Institute of Transportation Engineers (ITE) th Trip Generation, 8 Edition (2008). The average trip generation.r6tes for [TE Land Use Code (LUC) 565, d'aycare center, and ITE LUC 210, single-family detached housing, have been used for the trip generation calculations. Daycare facilities ha�e pass -by trips associated with parents dropping off children -in the morning before work and picking up children in the afternoon after work. These trips are not new trips generated by the development since these trips are currently on the surrounding roadway system. GTC collected data at the North Creek County Day "TREETf LOSANALYSIS - EIS -HEARINGS - SAFETY- SIGNALS - Pj COUNTSISURVEYS - SITE IMPACTS Aft kment 10 (page I of 19) 0 Mr- Dave Gebert, P.E. August 6, 2009 Page 2 School, which has similar uses to the Grow with Us daycare. GTC's data shows a pass - by rate of 69%. This pass -by rate -has been applied to the trip generation for the Grow with Us daycare. GTC's study for the North Creek, Community Day School is included with this report. This pass -by rate should be considered conservative since Snohomish County allows a 75% pass -by rate (dr daycares on arterials and Edmonds Way would be classified as an arterial by Snohom'sh.County. The Grow with Us daycare, based on a capacity of 49 students and the removal. of one single-family residential unit, will generate 58.48 new average daily trips (ADT) with I I AM peak -hour trips (6 inbound/5 outbound) and I I PM peak -hour trips (5 inbound/6 outbound). A summary of the trip generation has been included in Table 1. Tablet: Trip Generation Summary DAN —_ AM Peak -Hour Trips PM Peak -Hour Trips Land Use Trips Total Finbound Outbound Total Inbound Outbound Davcare - Total Trips 1 (49 Students) 219.52 39 21 18 40 18 22 Daycare - Pass -By Trips - 151.47 -27 -14 -13 -28 -13 -15 (49 Students) 1 Single -Family -9.57 -1 -1 0 -1 0 -1 TOTAL T58 -48 11 6 5 11 5 6 The trip generation calculations have been included in the atlachments. ACCESS ANALYSIS The development is proposed to have an internal one-way loop. Inbound traffic will enter at the cast edge of the property and the outbound traffic will exit at the west edge of the property. This configuration should maxim,ize the efficiency of the flow of traffic on the site- 1L_ An infori-nation sight distance analysis was performed using the Washington State Department of Transportation (WSDOT) SRWeb application, which has -photos taken at street level along all of WSDOT's routes. It appears that there is adequa�te sight distance in both directions from the access - a A ROOF I P Mr. Dave Gebert, P.E_ August 6, 2009 Page 3 TRAFFIC IMPACT FEES Traffic impact mitigation payments to the City of Edmonds are based on Edmonds Road Impact Fee Rate Studv Table 4, Impact Fee Rates. The table does not have a rate for daycares and therefore GTC has calculated the traffic impact fee based on the new PM peak -hour trips generated by the development, a mitigation fee of $736.66 per PM peak - hour trip and an estimated trip length factor. The average trip length for the City of Edmonds is not included in the City of Edmonds Trajji'c Impact Analysis Requirements and GTC staff was unable to obtain from City of Edmonds staff what.average trip length was used in the traffic impact fee calculations. The trip length factor has therefore been calculated from data used by Miral Associates in the City qf Monroe- An average trip length of 2.0 miles was used in the traffic impact fee calculations for the City of MoriroL An average trip length for Grow with Us daycare' patrons was calculated to be. 1-075 miles, based on data provided by the applicant for a similar center under the same ownership. This data results in a tri� length factor of 0.5375 for the daycare. This trip length factor is similar to the factor used by the City of Edmonds for high schools. The calculated trip length factor should therefore be appropriate since daycares and high schools have similar trip types and there are more daycare alternatives than high school alternatives, which would reduce the trip length for daycares. It should be noted that the calculated daycare trip length adjustment factor could be reduced if the average trip length for the City of Edmonds is greater than the 2.0 mile tnip length form similar cities that GTC used- Table 4, Impact Fee Rate and the Mirm Associates are included xvith this report. The Grow with Us daycare is anticipated to generate 12 PM peak -hour trips per Table 1, which results in 6.45 PM peak -hour trips when multiplied by the trip length adjustment factor. The traffic mitigation fees for the Grow with Us daycare are $4,751.46. Per Table 4, Impact Fee Rate (City of Edmonds) the credit for the existing single-family residence being removed is $840.72; therefore, the total mitigation fees the Grow with Us daycare will be responsible for is $3,910.74. aR'A"FOF'1'C",, VO 0 W. Dave Gebert, P.E. August 6, 2009 Page 4 GTC trusts that this updated memorandum and attachments adequately address the trip generation and traffic impacts of the proposed Grow with Us dayeare development. If there are any questions or cominents, please contact GTC at (425) 339-8266. Sincerely, GIBSON TRAFFIC CONSULTANTS, INC. J011 Matthew J. Palmer, P.E. W Traffic Engineer Attachments /(a /o7 CC: Scott Andersen' A-2322 RAFFIC Grow with Us Daycare GTC #09-079 Trip Generation for: Weekday (a.k.a.): Average Weekday Daily Trips (AWDT) NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS . DIRECTIONAL ASSIGNMENTS Gross Trips Internal Crossover TOTAL PASS -BY DIVERTED LINK NEW PASS -BY DIVE TEDI LINK NEW LAND USES VARIABLE ITE LU code Trip Rate % IN % OUT In+Out (Total) % of Gross Trips TrIpst n+Ou Total) 1(n+Out Total) % of Ext. LiEL I , n+Out (Total) % of Ext. Trips In+Out (Total) ln+Outi (Total) In Out In Out In Out 565 4.48. 50% 219. 1 1 0 219.52 1 151.471 'O'V,, 0 1 68,05 76 76 0 0 34 34 9.!� 500"", 50% -9.57 0 -9.57 0.00 0 -9.57 0 0 0 0 5 -5 l7rotals ...................... F, , 717", " T,77 .. 7, "T 209.95 1; 0 1 2 9.95 2 151.47 0 11 58.48 76 76 0 0 29 1 29 ji Grow with Us Daycare GTC #09-079 Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 7 and 9 AM (a.k.a.): Weekday AM Peak Hour NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS TOTAL PASS -BY DIVERTED NEW PASS -BY DIVE TE111 NEW Gross Trips Internal crossover LINK LINK ITE % of Trips 0y. o f % of Trip % % In+Out n+Out In+Out In+Out ln+Outi LAND USES VARIABLE LU Rate IN OUT (Total) Gross In+Out (Total) Ext 's (Total) Ext. (Total) (Total) In Out In Out In Out code Trips �To a Trip Trips Daycare 49 students 565 :tc 47% 39 0 39 27 1 0% 0 11 12 14 13 0 0 6 6 ,Single -Family Res (removed) -1 units 210 75% -1 0 0 0% 0 0 1 17rotals ...... 38 0 38 27 ,,, ..... 0 11 14 13 6 5 0 4 T� Grow with Us Daycare GTC #09-079 Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 4 and 6 PM (a.k.a.): Weekday OM Peak Hour NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS TOTAL PASS -BY DIVERTED NEW PASS -BY DIVERTED1 NEW Gross Trips Internal Crossover LINK LINK LAND USES VARIABLE ITE LU Trip % % In+Out % of G . ross Trips I n+Ou t In+Out %o Ext In+Out % of E xt. In+Out In+Out In Out in Out In Out code Rate IN OUT (Total) Trips Total) (Total) Trip (Total). (Total) (Total) Daycare 49 students 565 0.82 53% 40 0 40 �.5j 28- Q 0 1 12 13 15 0 6 7 Single -Family Res (removed) -1 -units 210 1.01 37% 0 0 1 0 t" :: �Oq 0 .1 0 T als r ot ......... ...... jllIl""�,�l""Ill""Illi�,-"""";","-","�,, =71"T"TT, 39 0 39 28 . ..... 0 1, 1 151 0 f 5 1 6 0 � MOM rflaUls-Foc C 00 H7ULVIAIMV�B TRAFFIC ENGINEERING eTRANSPORTATION PLANNING RADIO 123 BLDG. - 2917 PACIFIC AVENUE - EVERETT, WA 98201 (206) 339-8266 -7 Z;�t_j(S)j —fD S-1 C­C� Z_ May 13, 1992 H EA R I N G EXA N, I E R, -.4 Mr. Norman Stone, LURE Snohomish County Dept. of Public.Works 1992 2930 Wetmore Avenue, Ist Floor EXHI'8iT Everett, WA 98201 CASE RE: .. 7-A61.10303 - North Creek Country- Day School (GTC # 92-038) Traffic Impact Study for proposed School Expansion Dear Mr- Stone. - I OR Background: Gibson Traffic Consultants (GTC) has been hired by Jane Heusse (Owner/ Applicant), to complete a traffic assessment of trip geheration and mitigation requirements for the proposed expansion of the North Creek Country Day School on 196th Street SE west of SR-527 in Snohomish County (see Figure 1). We have reviefwed your preliminary comments for the subject project (December 19, 1991 memorandum to Ernie Jensen). It was determined that the subject project is located within Transportation Service Area USA) "F". This traffic assessment memorandum addresses trip generation/ distribution, existing LOS conditions and the impacts of the proposed development on the affected County road system per the requirements of the new Title 26.13 ordinance. Note: This project would only generate four (4) new PM peak trips and thus, the recent Traffic Impact Analysis Checklist ircm WSDOT District 1 is not applicable. However, the newly signaiized intersection of SR-527 and 196th Street SE (as part of WSDOT's Phase I improvements to the SR-527 corridor) was analyzed since a critical access intersection. 196th Street, which dead -ends just west of the project site, would handle 100 % of site traffic -ast to SR-527. Description of Proposed Site Development and Access: FhIs CUP applicatirn proposes to expand an existing pre-school, elementary and extenued day-care facility on —.3 4-acre site at 1510-196th Street SE. Two (2) pre-school c!asses, one K-3 elementary class and AM/PM daycare classes are being conducted at the North Creek Country Day School, using a converted single family residence and garage at preSent.. The site proposal calls for construction of a new 28' x 56' structure to housetwo (2) new classrooms for new elementary and pre-school students. There are presently 73 students enrolled at the school, with 18 new students projected for the 1992-93 year and 9 additional students projected by 1994-95 (total student enrollment of 99),;=- - Access to the site would be provided via two driveways (inbound west access and outbound east access)- Both driveways have a gravel surface at present, but would be paved with site construction along with the parent drop-off/pickup loop and 14 on -site parking stalls (see SiterPlan). The inbound driveway would be located approximately 225 feet east of the North Creek Bridge,while the outbound driveway would be located within an existing 30-foot access easement near the east property boundary (110 feet east of west/inbound entrance). COUNTSISURVEYS - SITE IMPACTS 9 LOS ANALYSIS e EIS a HEARINGS * SAFETY * SIGNALS * PARKING 0 Mr. Norman Stone May 13, 1992 Page 3 TRIP GENERATION Existing Traffic & Travel Modes: An origin -destination and travel mode survey of the existing 73 students in preschool and K-3 classes was conducted by Edith Christianson, manager of the North Greek County Qay School. Parents of. students were surveyed to determine trip origin, travel mode. and trip time data. Three (3) distinct groups were identified in the travel survey: 1) Single occupant vehicle (SOV) coming directly from home or college to school; 2) SOV vehicle droppiN off student(s) on way to work; and, 3) carpool vehicle (HOV) with student(s) riding with school staff or sibling. As summarized in Table 1, the existing school generates an estimated 150 ADT on an average weekday with a total of 75 vehicles (66 parent and 9 staff). Ova.- t�lo-thirds (69 %) are pass -by trips by SOV or HOV vehicles. Thus, new site trips by SOV or HOV vehicles arriving from homes or near -by colleges represent 31 % of daily site traffic. Note: Non of the students presently walk or bike to school and parent/staff vehicles represents nearly 100 % of daily site traffic. Traffic Generated by New QlassroomqJ2 J. Section 520 (Elem. School) of the 5th edition ITE Trip Generation manual was utilized to estimate the daily site trips generated by the two (2) proposed classrooms. Full occupancy of the new classrooms is projected by 1994-95 (3rd year), and 30 new daily trips are projected for the site proposal. FM peak hour trips to be generated were determined by estimating the nurinber �f daily trips that would occur during the critical 3:30-5:30 PM commuter peak period. Peak departure times and number of students departing per the existing travel survey are: 12:00 PM - 15; 3:30 PM - 31; 5:00 PM - 15; and 5:30-6:00 PM - 12. Nearly 2/3 of exiting peak trips' occur during the critical PIVI peak period. Thus, it is estimated that approximately 1/3 of daily trips would occur during the afternoon rush hour - 10 PM peak trips. The number of new daily/peak trips for the expanded. school facilities would be 9 AWDT and 4 PM peak trips (new), assuming the existing 69 % pass -by trip rate. Trip Distribution & PM Peak Volumes: As shown in Figure 2, tr.p distribution percentages for daily and PM peak -hour traffic to/from the project site were estimated based on the 0 & D survey of existing students. The majority of the new school traffic (55%) would be destined to the north on SR-527 with 15% east onto 180th and 40% north on SR-527 (5% to Seattle Hill Road, 25% to,Mill Creek Road and 10% to the west on 164th Street). Forty percent (40%) of new School traffic would be des&ed to the south on SR-527 with 15% east onto Maltby (212th), 20% west to Filbert Road and 5% south on SR-527. The remaining 5% are local trips on 196th Street to the east. Existing Level -of -Service (LQS) at Critical Intersections: The'�worst leve!s of congestion and longest delays to motorists will generally occur during the PM peak period. A measure of the relative congestion levels can be made by calculating the level - of -service (LOS) at intersections. Traffic operations Within the study area were analyzed using the methodology pcesented in the 1985 Highway Capacity Manual (HCM). LOS' ratings for each intdrsecton range from LOS A (free flow) to LOS F (forced flow or jammed conditions), with LOS E being capacity conditions. LOS D (tolera. d Qle elays) is R' 'A'AA1 'C" I North Creek Country Day School 1510 - 196th Stre.et SE Snohomish County, Wa. GgBSON TRAFFIC CONSULTANTS Matthew Avery— Whi tney Burns Marianna DeTIDrrE Ashly C(:)ul(L_ I SODtt Holma� I Hillary Iveans— i Nicholas Kropp— i Katerina LaMarch i James McDowell — I Brendan McMahork_ Megan May_ Erik Olsozl___ Jessie Owen— Shefali Pace Claim Pallarx-,ch i Kelly Pattison— I Kyle Pattison j Liz Pynsky j Ashley Scotto — Tara Scott.. Alison Simmons Kyle Taylor Fbrrest Itmapson Alec Turnbull Ryan White art, kno Iq_I;_ :?1-7 0 CLASS LIsT Z e jj_U AND NORMA'S ROCM Y Y Y Y Y IVL4-' CREEX Ct)Ut,t T,,�Y --)AY SCHO th ST - -S - E BOTOLE.1-1-, 4220.050 Pass -By Rates Adopted 3131103 uniess otherwise noted, First Revision 10/11104 (1) For any given land use being reviewed by DPW, if a pass -by rate is not included in the table shown in Subsection 4220.050(2) below, but an average pass by rate for the AM and/or PM peak hour is included in the ITE Trip Generation Report, then the ITE average pass -by rates shall be used., (2) For Drive -Through Espresso Stands, Daycare Located on Arterials, Specialty Retail, Health Clubs, and Video Store the following pass -by rates shall apply: ITE Code Description Pass -By Rates Conditions Espresso 100% Apply this rate only to free-standing, no sit - Stand down, drive -through -only espresso stands 565 Daycare 75% Apply this rate only to daycare facilities located on arterials. 814 Specialty 25% Retail 493 1 Health Club 154% 896 Video Store 53.5% for ADT, 80% for peak -hour trips 912 Drive-in Bank 47% (3) Unless stated otherwise in an adopted DPW Rule, the pass -by rate for PM peak hour trips will be used for average daily trips (ADT)- (Adopted 8/8/00) 4220.060 Traffic Counts Adopted: 111103, First Revision 10/11104 (1) Traffic Studies provided for large developments will need to include traffic counts for any impacted key intersections on critical arterial units. These counts are necessary to estimate future volumes and to support the forecast assignments of trips from the development at the intersections- (2) DPW has a regular program of conducting traffic counts and may be able to provide the developer with acceptable counts. DPW will determine whether or not specific available traffic counts are acceptable- For purposes o * f future analysis of level of service for traffic studies, the count date should not be more than one year prior to the submittal date of the report. An older count is only acceptable with prior written permission from the department. For other purposes, such as screening or assistance with trip distributions, counts may be up to two �years old- When acceptable counts are not available fro�m DPW, developers must provide new counts with their traffiG studies. (3) DPW may develop guidelines to be used to determine whether or not counts are acceptable and a standard format for counts, including a tabular format- 4220.070 Trip Distributions and Assignments Adopted: 111103, First Revision 10/11104, Second Revision 1219107 (1) Trip distribution means applying the trip generation to the road system to forecast the number of new vehicle trips on specific roads in the system. A "trip distribution" is a type of traffic analysis that estimates the likely destinations of trips generated by a proposed development and the likely traffic routes to reach those destinations. The result of this analysis is a map or list indicating what number or percentage of trips from the proposed development are 6dded to the development's road system, including the number or percentage of trips added to individual traffic movements on arterial units and/or at intersections. The analysis provides a set threshold, consisting of a predefined number or percentage of trips below which no attempt is made to further distribute the trips onto the road system - DPW Rules Page 9 of 12 0 Chapter 4 - Impact Fee Schedule The 'impact fee schedule was developed by adjusting the "cost per trip end" information to reflect differences in trip -making characteristics for a variety of land use types within the study area. The fee schedule is a table where fees are represented as dollars pet unit for each landuse category. Table 4 shows the various components of the fee schedule (trip generation rates, new trip percentages, trip lengths, and trip length adjustment for each land use). Trip Generation Components Trip generation rates for each land use type are.derived from the Institute of Transportation Engineers (ITE) Trip Generation (7th Edifion). The rates are expressed as vehicle trips entering and leaving a property during the I'M peak hour. PASS -BY TRIP ADJUSTMENT The trip generation rates represent total traffic entering.and leaving a property at the driveway points. For certain land uses (e.g., retail), a substantial amount of tl�is traffic is already passing by the property and merely turns into and out of the driveway. These pass -by trips do not sicrnificantiv impact the surrounding street system and therefore are subtracted out prior to calculating the 'impact fee- The resulting trips are considered "new" to the street system and are therefore subject to the impact fee calculation- The "new" trip percenta-es are derived partially from ITE data and from available surveys conducted around the countTy_3 TRIP LENGTH ADJUSTMENT Another variable that affects traffic impacts is the length of the trip generated by a particular land use. The "cost per trip" calculated in the impact fee program represents an average for all new trips generated within Monroe. Being an average, there will be certain land uses that generate trips of different lengths. If a given trip length is shorter than the average, then its relative traffic impacts on the street system will be lower than average. Conversely, longer trips will impact a larger proportion of the transportation network. In order to reflect these differences, the method includes an ad-ustment factor, which is calculated as the ratio between the trip length for a particular land use type and the "average" trip len'th for the City- 9 Trip length data were estimated using limited national survey resultS.3 These national data showed average trip lengths of around 3.1 miles. The average trip length estimated for Monroe was 2.0 miles, based upon the 2025 mix of land use types within the study area and the geographic size of the city. To better reflect Monroe's conditions, the trip lengths were adjusted lower to match the 2.0 mile average for M onroe. 3 Trip Generation Sources: ITE Trip Generation (7th Edition)- ITE Trip Generation Handbook,(March 2001), Pinellas County (FI) Impact Fee Study (1991), Osceola County (FI), Aftemative Traffic Generation Rate Study (2004), Polk County (FI) Transporlation Impact Fee Study (2005). City of Monroe Augu!�t 2007 Transportation Impact Fee Rate Study Page 15 E 0 Addresses of 50 Crients of my Center Located At 21313 84th Ave W Edmonds WA 98026 Address city state Zipcode 1- 22024 761h Ave W Edmonds WA 98026 2.21713 80th Ave W Edmonds WA 98026 3.23317 Edmonds Way Edmonds WA 98026 4. 22420 95th PI W Edmonds WA 98020 5. 23523 Edmonds Way Edmonds WA 98020 6- 21323 80th Ave W Edmonds WA 98026 7. 8121 236tti St SW Edmonds WA 98026 8. 8524 Bowdoin Way Edmonds WA 98026 9. 642 Maple St Edmonds WA 98020 10. 23510 Edmonds Way Edmonds WA 98026 11. 7315 224th St SW Edmonds WA 98026 12. 8725 220th St SW Edmonds WA 98026 13. 9216 220th St SW Edmonds WA 98026 14. 7707 238th Pf SW Edmonds WA 98026 15. 614 6th Ave N Edmonds WA 98020 16. 22829 85th PI W Edmonds WA 98026 17. 20317 92nd Ave W Edmonds WA 98020 18. 23430 97th PI W Edmonds WA 98020 19- 23014 Edmonds Way Edmonds WA 98020 20- 20503 79th Ave W Edmonds WA 98026 21. 7308 208th St SW Edmonds WA 98026 22. 23332 Edmonds Way Edmonds 'WA 98026 23. 8134 212th St SW Edmonds WA 98020 24. 22217 76th Ave W Edmonds WA 98026 25. 7302 213th PI W Edmonds WA 98026 26- 8325 226th St SW Edmonds WA 98026 .27. 7222 208th St SW Edmonds WA 98026 28. 20714:76th Ave W Edmonds WA 98026 29. 7409 210th St SW Edmonds WA 98026 30. 21124 Shelf Valley Rd Edmonds WA 98026 31. 21323 80th Ave W Edmonds WA 98026 32- 7201 224th St SW Edmonds WA 98026 33- 23408 Edmonds Way Edmonds WA 98026 34. 22309 92nd Ave W Edmonds WA 98020 35- 21822 82nd PI W Edmonds WA 98026 36. 8408 224th St SW Edmonds WA 98026 37. 7726 218th St SW Edmonds WA 98026 38. 9601 224th St SW Edmonds WA 98020 39- 21319 84th Ave W Edmonds WA 98026 40. 8504 218th St SW Edmonds WA 98026 41. 7512 218th St SW Edrnonds WA 98026 42. T723 209th St SW Edmonds WA 98026 43- 19729 76th Ave W Edmonds WA 98026 44. 7807 218th '�t SW Edmonds WA 98026 45. 22828 76th Ave W Edmonds WA 98026 46. 8623 204th St SW Edmonds WA 98026 47.8415221stPIS%N-f- Edmonds WA 98026 48.23502 Edmonds Way Lynnwood WA 98036 49. 229W Edmonds Way Edmonds WA 98020 50.23028 83rd Ave W Edmonds WA 98026 fit 3. TQIP LEA3&T-JA pACTOP�- 93. E I ryl I'v, j 5� A r oAJ-5 q AliA It33 I- its —DAr m�A 1 A3 C P-t\ 4�-Ce, L 0 lj v �77, -7 Its -Z 13 ta 9 Ll 44N Avt, LJ 7. 39, q W v%i(es lEh&opjw LOA-qgo-L(c q M,�v. 31 WtA as fn 3-5- YVI f qo q 7ft -Aej 93. qq :3 Ll M,�� r? 3 tin i"n rn,-LGI� IK ,f , Z 19. 7miV J 47. q Mi-(t5 . M 1-1 qg o7q .7 o4s (C-f 11 MAO 5 m \A 67 m% fej S-o 3 m�jx r",Io f-Y- '-7 m;l -14, 3 1,, OX A ALA 7,5- oq Aj qqml 11�1' Av vt, T I iyi e- 2& Z� eA Av5 A, iLxs 03 It -S 3 Sq e,.s es 07 rl-1tvp e,,s 0 41-7 Edmonds Road Impact Fee Rate TABLE 4 IMPACT FEE RATES (2) (3) (4) (5) (6) Trip ITE ITE Land Use Trip % New Length Net New Trips per Impact Fee Per Unit @ $ Code Category Rate' Trips' Factor' Unit of Measure 763.66 per Trip 110 Light Industrial 0.98 100% 1.59 1.56 1,000 sq ft I - 19 per square foot 140 Manufacturing 0.74 100% 1.59 1.18 1,000 sq ft 0.90 per square'foot 151 Mini -warehouse 0.26 100% 1-59 0.41 1,000 sq ft 0.32 per square foot ZIO Single family 1.01 100% 1.09 1.10 dwelling 840.72 per dwelling unit House 220 Apartment 0.62 100% 1.15 0.71 dwelling 544.49 per dwelling unit 230 Condominium 0.54 100% 1.15 0.62 dwelling 474.24 per dwelling unit 240 Mobile Home 0.56 100% 1-09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0.61 100% 1.25 0.76 room 582.29 per room 320 Motel 0.47 100% 1 1-25 0.59 room 448-GS per room 420 Marina 0.19 100% 0.97 0.18 berth 140-74 per boat berth 430 Golf course 0.30 100% ' 1.00 0.30 acre Z29.10 per acre 444 Movie Theater 3.80 100% 0.72 2.74 1,000 sq ft 1.36 per square foot 492 Racquet club 1.83 100% .0.97 1.78 1,000 sq ft 3_S8 per square foot 530 High School 1.02 100% 0.62 0.63 1,000 sq ft 0.48 per square foot 560 Church 0.66 100% I.IS 0.76 1,000 sq ft O-S8 per square foot 610 Hospital 0.92 100% 1.56 1.44 1,000 q ft `lA 0 per square foot 620 Nursing home 0.20 100% 0.87 0.17 bed 132.88 per bed 710 General Office 1.49 100% 1.59 Z.37 1,000 sq ft 1.81 per square foot 720 Medical office 3.66 100% 1.50 5.49 1,000 sq ft 4.19 per square foot 820 Shopping Center 3.74 81% 0.40 1.21 1,000 sq ft 0.93 per square foot 832 Restaurant: sit- 10.86 56% 1.06 6.45 1,000 sq ft 4.92 per square foot down 833 Fast food, no 5 52% 0.62 8-,.J 1,000 sq ft 6.44 per square foot drive -up 834 Fast food, w/ 33.48 51% 0.62 10-59 1,000 sq ft 8-08 per square foot drive -up 844 Gas station 14.56 __�3_38 60% 0.53 4-63 pump 3,53S.82 per vfp 845 Gas station 47% O.S3 3-33 pump 2,545.26 per vfp' vdconvenience 850 Supermarket 11-51 55% 0.65 4.11 1,000 sq ft 3.14 per ---square foot 851 Convenience 53-73 39% 0.40 8.38 1,000 sq ft 6.40 per square foot market-24 hr 912 Drive-in Bank 1 54-771 51%1 0.47 1 13.13 1,000 sq ft 10.03 per square foot 'ITE Trip Generation (6th Edition): 4-6 PM Peak Hour Trip Ends 3 Excludes pass -by trips: see "Trip Generation Handbook: An ITE Proposed Recommended Practice" (1988) 4 Ratio to average trip length. 5 vfp: vehicle fueling position Henderson, City of Edmonds, Washington Young & April 15. 2003 Company Page 18 'pKCIO, 70;". M� HW A: EOSCIENCES INC. GC*ot'ec1*zmca1 Pavemcnt En ineering - Hydrogeotogy - GcocillIrl'olinfelital - hispectioll Testing July 18, 2007 HWA Project No. 2007-105-21 Anderson Development 23632 Highway 99, # F-502 Edmonds, Washington 98026 Attn: . Mr. Scott Anderson Subject: GEOTECHNICAL INVESTIG&TION Commercial Development 665 Edmonds Way Edmonds- Washington 98020 Dear Mr. Anderson: At your request., HWA GeoSciences Inc.. (HWA) has undertaken and completed a geotechnical investigation within your existing residential lot, for your proposed commercial development in Edmonds,.Washington. This'investigation has been performed in support of the application required to obtain a -building permit from the City of Edmonds for the proposed 4,800 square foot, two-story, commercial building at the subject site. For the purposes of this investigation, HWA performed a review of pertinent geologic maps for the site area, conducted a site reconnaissance to observe local topographic features, excavated 5 shallow hand borings, and conducted 5 DCP (Dropweight Cone Penetrometer) soundings to delineate in situ density/strength conditions of the site soils within the footprint of the proposed development. PROJECT LOCATION The subject property, presently consists of a. developed 0.3 9 acre lot, located within the SW 1/4, Section 25, Township 27 N, and Range 3 E; situated at municipal address 665 Edmonds Way, in Edmonds,.Washington (Snohomish County No. 2703250003080000). The approximate site location is depicted on Figure 1, the Project Site & Vicinity Map. 19730 -.64th Ave.nue W. RECEIVED Suite 20V,,.','., Lynnwood, WA.980 36��.�� JUL 2 4 2008 425:774. �Tel ;�S BUILDING DEPT.:�.;: "TREE: T FILE July 18, 2007 0 0 HWA Project No. 2007-105-21 PROPOSED DEVELOPMENT As currently proposed, the new development will consist of a single 4,800 square foot, two-story, commercial building situated over the footprint of the existing residential structure, as shown on Figure 2, the Site & Exploration Plan Map. SITE OBSERVATIONS Currently, an existing one-story wooden residential structure, built in 1953, occupies a footprint area of approximately 1,441 square feet in the central portion of the roughly 17,000 square foot lot. The commercial development will require demolition of the existing residential structure. The lot is relatively level in the front and ascends a slope in the backyard in the northeast comer. GEOLOGY The published geologic map for the site area, "Composite Geologic Map of the Sno-King Area ", prepared by Booth, et al, 2004, shows that the site vicinity is underlain by Vashon advance outwash. Advance outwash deposits consist of chiefly gray, clean to slightly silty, fine to medium sand, with varying percentages of gravel. These materials were deposited in pro -glacial streams as the Vashon Stade ice advanced southward in Puget Sound. In general, the sediments are coarser at higher levels of the unit, because the streams deposited -larger materials closer to the ice front. Because these granular soils were over -ridden by the Vashon Stade ice, they are dense to very dense. They are quite permeable; however, they are not always water -bearing. Advance outwash is generally competent for support of structures, and excavates relatively easy with conventional excavation equipment. Although sideslopes in this sand stand near -vertical temporarily where dry, shoring is necessary for long-term support. SOILS According to the Soil Conservation Map for Snohomish County (NRCS, online web soil survey, 2007), the site is overlain by Everett gravelly sandy loam on 0 to 8 percent slopes. The Everett gravelly sandy loam soils formed on glacial outwash. The rate of runoff is slow and the erosion hazard is slight for these soils. SITE EXPLORATION ,d On July 3 , 2007, HWA geologists conducted a limited shallow hand -exploration program to evaluate near -surface conditions on the site. At that time, 5 hand borings were conducted to depths ranging from 3.0 to 4.8 feet, before refusing on coarse gravel or cobbles. Site soil conditions were noted at each of the hand boring locations, which were selected based on the location of proposed structures, as shown on the Site Plan provided by the project architect. The approximate locations of our hand borings are shown on Figure 2, the Site & Exploration Plan Map. 665 Edmonds Way Development. 2 HWA GeoSciences Inc. July 18, 2007 0 HWA Project No. 2007-105-21 Hand boring logs were prepared from our observations, and are presented on the attached Figures 4 through 8. A legend of the terms and symbols used on the exploration logs precedes them as Figure 3. The hand auger borings at all locations were supplemented by utilizing a Dropweight Cone Penetrometer (DCP) to check relative soil density/strength conditions. The DCP consists of a steel extension shaft assembly, with a 60 degree hardened steel cone tip attached to one end, which is driven into the subsoil by means of a sliding drop hammer. The base diameter of the cone is 20 mm. The diameter pf the �shaft is 8 mm less than that of the cone to ensure that at shallow penetration depths the resistance to penetration is exerted on the cone alone. The DCP is driven by repeatedly dropping an 8 kg sliding hammer from a height of 575 mm*. The depth of cone penetration was measured after each hammer drop and the soil shear strength is reported in terms of the DCP. index. The DCP index is based on the average penetration depth resulting from 1 blow of the 8 kg hammer and is reported as millimeters per blow (mm/blow). The data obtained from the DCP tests was correlated to approximate Standard Penetration Testing (SPT) blows per foot, in order to evaluate the density/strength of the subgrade soils.' The DCP data is plotted on the appropriate Hand Boring/DCP Logs on Figures 4 through 9. LABoRAToRy TESTING Laboratory tests were conducted on selected samples obtained from the hand boring explorations to characterize relevant- engineering and index properties of the site soils. Laboratory tests included determination of in -situ moisture content and particle size characteristics. The tests were conducted in general accordance with appropriate American Society of Testing and Materials (ASTM) standards. The moisture content test results are displayed on the exploration logs and on the particle size distribution graphs provided on Figure 10, as appropriate. SOIL PROFILE Typically, the near surface soils observed in the hand borings consisted of loose to medium dense fill soils overlying weathered and unweathered glacial outwash soils. The soil conditions are described briefly as follows: Undocumented Fill.. -hrunediately below grade, in all hand borings except HH-4, undocumented fill was encountered, and consisted of loose to medium dense, brown to yellow brown, fine sandy silt silty fine sand to sand with silt and gravel; often containing wood debris. This soil unit was fully penetrated in HH-3 and HH-4 where it was 4.4 and 3.4 feet thick, respectively. Apparently, the fill thickens to the south and from east to west on site. Weathered Outwash: - Weathered outwash, consisting of loose, brown to yellowish brown, silty sand with to sand with silt and gravel, was encountered below the fill in all 665 Edmonds Way Development. 3 HWA GeoSciences Inc. July 18, 2007 0 0 HWA Project No. 2007-105-21 the hand borings at depths ranging from 0.2 to 2.9 feet below the existing ground surface. The thickness of this unit, where penetrated in HH-2, HH-3, and HH-5, ranged from 0.9 to 2 feet. Below this unit, the soil becomes cleaner, denser, and changes color to olive brown or gray. Advance Outwash — Advance outwash, consisting of medium to dense, olive brown to gray, sand with silt and gravel, was encountered below the weathered outwash at an approximate depth of 2.8 feet in HH-2; at 3.8 feet in HH-3; and 3.0 feet in HH-5. The thickness of this unit is unknown as it was too deep to fully penetrate with hand tools. It appears, however, that the depth to advance outwash increases slightly from west to east. DCP soundings indicate that these soils become denser at about 4 to 5 feet below existing grade at the test locations. GROUND WATER Ground water seepage was not observed in any of the hand borings. However, it is anticipated that ground water conditions will vary depending on the season, variations in local subsurface conditions, and other factors. During wet season periods, it is possible that ground water may become perched on the surface of lower permeability deposits that may exist at other locations of this site. GEOLOGIC HAZARDS In accordance with the criteria contained in the City of Edmonds Code, Title 23-Natural Resources; Chapter 23.80 — Geologically Hazardous Areas, the subject site is not situated within an area designated as a potential erosion or landslide/steep slope or seismic hazard. The existing native soils consist of granular soils that were directly glacially consolidated, and are dense. There are no steep slopes on the property and, consequently, no potential landslide hazard. CONCLUSIONS AND RECOMMENDATIONS General In summary, the soil conditions within the subject site proposed for the commercial development consists of medium dense, granular, glacial outwash soils, overlain by loose to medium dense undocumented All and weathered outwash layers at least 4-5 feet thick. The actual depth to medium dense native soils at other locations within the development footprint will need to be verified in the field during construction. In our opinion, the medium dense to dense native sand (outwash) will provide adequate bearing for the foundation system for the proposed single -story structure. However, the undocumented fill and weathered outwash materials are not recommended for foundation and floor slab support purposes. 665 Edmonds Way Development. 4 HWA GeoSciences Inc. July 18, 2007 HWA Project No. 2007-105-21 Excavation and Temporary Shoring Requirements Preparation for construction of conventional foundations will require the excavation and removal of all undocumented fill beneath proposed footing and slab areas. Based on the results of our investigation, these excavations will be at least 4 feet deep or greater and require excavation wall sloping and/or shoring to protect workers and existing structures in accordance with Part N of WAC (Washington Administrative Code) 296-155. The fill materials at the site classify as Type C soil. Unsupported excavations in Type. C soils, exceeding 4 feet in depth, must be inclined no steeper than 1 Y211: IV (horizontal to vertical). Flatter slopes may, however, be required if ground water seepage occurs. Temporary excavation slopes should be protected from erosion, as necessary, by covering the cut face with well -anchored plastic sheets. Maintenance of safe working conditions, including temporary excavation stability, is the responsibility of the contractor. Based on the soil conditions observed in our explorations, we anticipate that the on -site soils can be excavatedwith conventional equipment such as backhoes and loaders. Foundations and Floor'Slabs Design Considerations: The proposed structure may be supported on footings bearing directly on medium dense native soils; or on properly compacted structural fill, which may, subject to the prior approval of the geotechnical engineer, consist of the existing on site undocumented fill soils that are removed and replaced under controlled compaction. The recommended compaction level for structural fill placed under footings and grade - supported slab levels is 95% Modified Proctor maximum dry density (per'ASTM D1557). In our opinion, wall or column footings bearing in medium dense to dense advance outwash may be designed for 2,50.0 pounds per square foot (psf) maximum allowable bearing pressure. Footings bearing within structural fill placed over the dense to very dense glacial till may be designed for allowable bearing pressures up to 2,000 psf These values may be increased by 1/3 for short-term loads such as wind and seismic. effects. It is not,.however, recommended that foundations be designed for differing bearing pressures, or be supported on dissimilar materials, to avoid potentially undesirable differential settlements. Continuous footings should have a minimum width of 18 inches, and column footings should have a minimum width of 24 inches, regardless of bearing pressure considerations. Minimum footing widths may, therefore, govern footing design. Footings should bear at least 24 inches below the lowest adjacent exterior grade to provide for frost protection. If footings are supported by structural fill, this fill should extend beyond the outer edges of the footings a minimum distance equal to the fill thickness existing below the footing, measured at the level of the excavation base. If adjacent individual footings are located at different elevations, it is recommended that the horizontal distance between them be at least 1.5 times the elevation difference between their 665 Edmonds Way Development. 1 5 . HWA GeoSciences Inc. July 18, 2007 0 0 HWA Project No. 2007-105-21 bases. Where adjoining continuous footings are at different elevations, the upper footing should be progressively stepped down to the lower footing. Typically, each step height should be limited to 2 feet or less and the following footing ran should be at least twice the step height. We recommend that perimeter foundation drains be provided around all exterior footings. The footing drains and all surface drains should be separately tight -lined to discharge to a sewer or storm basin. Surface and roof drains should not be inter -connected with the foundation drains to prevent the potential clogging and flooding of these drains. Floor slabs may be supported at grade on structural fill compacted to the requirements indicated above. If grade-supported.slabs are employed, they must be underlain by a capillary break layer comprised of clean, uniform, open -graded, washed rock or pea gravel, to prevent future slab dampness which could be detrimental to floor coverings and functional use of the facility. This capillary break layer should be at least 6 inches thick and should be in contact with, or provided with suitable drainage outlets, to the perimeter foundation drain system. A plastic vapor barrier should be placed on top of the capillary break layer to isolate the slab concrete from this layer, and should consist of plastic sheathing such as Visqueen. Construction Considerations: Footing foundation excavations should be trimmed neat and the excavation bottoms should be carefully prepared in order to minimize the amount of soil disturbance and need of over -excavation that may otherwise be required. The ground surface, where structural fill, foundations, or slabs are to be placed, should be proof -rolled, or suitably probed to determine the presence and approximate extent of any soft or unstable areas. Proof -rolling or probing should be performed under full-time observation of an HWA representative. Any soils that cannot be adequately recompacted should be over -excavated and the unsuitable materials removed and replaced with compacted structural fill to a depth that will provide a stable base. We recommend that HWA be retained to observe and approve footing excavation preparation, and placement and compaction of structural fill prior to pouring concrete. Assuming construction is performed as recommended herein, we estimate that the total and differential settlements for foundations will be less than 1 -inch and 1/2 -inch, respectively. Seismic Considerations Should it be necessary for a development of this type to be designed for seismic conditions, we anticipate that the new structures would be designed in accordance with the 2003 International Building Code (IBC) standards. In this regard, for seismic design purposes, the site is considered Site Class C, as described in Section 1615.1 of the 2003 IBC. For the site location, the design maximum considered spectral response 665 Edmonds Way Development. 6 HWA GeoSciences Inc. July 18, 2007 0 0 HWA Project No. 2007-105-21 acceleration at short periods, Ss, is 1.26g. The design maximum considered spectral response acceleration at 1 second period, S1, is 0.43g. Soil liquefaction is a phenomenon wherein loose, saturated, granular deposits temporarily lose strength and behave as a liquid in response to earthquake shaking. Based on our observation of relatively dense material at or close to the base of the hand borings and the apparent absence of regional ground water, at shallow depths, we consider the potential for seismic liquefaction on the site to be negligible. Hence, seismically induced liquefaction instability is not considered to be an issue for this site. Erosion Control during Construction Best Management Practices (BMP's) as described in City of Edmonds Code must be followed for erosion control during construction. These measures include an erosion control plan that addresses, limiting activity during wet periods, placement of a silt retention system on the eastern side of the property, and proper disposal or recompaction of any material that is disturbed on the site. CONDITIONS AND LIMITATIONS We have prepared this letter report for Mr. Scott Anderson, for use in design, permitting, and construction of the proposed 4,800 square foot building on the subject lot. Experience has shown that soil and ground water conditions can vary significantly over small distances. Inconsistent conditions can occur between explorations and may not be detected by a geotechnical study of this scope. Accordingly, HWA should be consulted for review and potential revision of our recommendations, if conditions are encountered during construction that. differ materially from those encountered during our investigation and described in this report. Our scope of work did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or ground water at this site. HWA does not practice or consult in the field of safety engineering. We do not direct the contractor's operations and we cannot be responsible for the safety of personnel other than our own on the site; the safety of others is the responsibility of the contractor. The contractor should notify the owner if any of the recommended actions presented herein are considered unsafe. 0-0 665 Edmonds Way' Development. 7 HWA GeoSciences Inc. July 18, 2007 0 0 HWA Project No. 2007-105-21 We appreciate the opportunity to be of service, and trust that this report meets with your requirements. However, if you have any questions regarding this report, or require further assistance, please do not hesitate to contact either of the undersigned at (425) 774- OtO6. Sincerely, HWA GEOSCIENCES INC. I EXPIRES 08 / 24 / =0 Steven E. Greene, L.E.G. Lome A. Balanko, P.E. Vice President/Senior Engineering Geologist President Attachments: Figure 1: Project Site Location and Vicinity Map Figure 2: Site Plan & Exploration Plan Figure 3: Legend of Symbols and Terms Figure 4: Log of HH-1 & DCP-1 Figure 5: Log of HH-2 & DCP-2 Figure 6: Log of HH-3 & DCP-3 Figure 7: Log of HH-4 & DCP-4 Figure 8: Log of HH-5 & DCP-5 Figure 9: Log of DCP 1-B Figure 10: Particle Size Analyses 665 Edmonds Way Development. 8 HWA GeoSciences Inc. July 1.8, 2007 HWA Project No. 2007-105-21 REFERENCES Booth, D.B, Cox, B.F., Troost, K.G., a S. A. Shimel, 2004, Col"posite Geologic Map of the Sno-King Area, University of Washington, Seattle Area Geologic Mapping Project. City of Edmonds, 2000,'Title 23-Natural Resources;'Chapt& 23.80 — Geologically Hazardous Areas. International Code Council (ICC), 2003 International Building Code. NRCS, 1. 983; Soils Map ofShohomish County Area, WA661 (on-line version) WSDOT, 2006, Standard Specificationsfor Road, Bridge, and Municipal Construction, M 41-10. 665 Edmonds Way Development. 9 HWA GeoSciences Inc. TOPOI map printed on 07/09/07 from "Washngton.tpo" and"Untitled.tpg" X iLN Ui, f KIM ma ,WAW� ., gg, gm /A F 3A Approximate 74 Project Site . . . . . . . . . . . cation f 11 �l A7 ............. il M45" vW: �g rull z All, Oil - NOW q;L; .-Awl it THt /MN vIr OW FEET 9L���I= MIAM F%Wed dom TOM 02MI Nalkaw Oeogmphic Hokbp (www."xom) PROJECT SITE & VICINITY MAP FIGURE NO. GEOTECHNICAL INVESTIGATION PROJECT NO. HWAGEOSCIENCES INC. COMMERCIAL DEVELOPMENT u iml 665 EDMONDS WAY 2007-105 EDMONDS. WASHINGTON DRILLING COMPANY: HWAGeoSciences Inc. SURFACE ELEVATION: i feet TE STARTED: 07/03/2007 IRTE DRILLING METHOD: Hand Auger COMPLETED: 0710312007 SAMPLING METHOD: Grab LOGGED BY: T. Taddese & D. Coltrane LOCATION: See Figure 2 C0 Lu L) W (L co e z U) Non -Standard Penetration Resistance 0 z Fn A U) W 1— 17.6 lb weight 32.6" drop 2 _J 0 U) ca W U.1 J CL uJ _J (L LU � X W W z n 2 L) W >. U) 2� Lu 0 It a- W 0 U) =) DESCRIPTION Y) Q. z 0 0 a 0-1 ML Soft, brown, fine to medium sandy SILT, roots and rootlets, i F-0 2- 3- 4- 5- 6- 7- 10� dry to moist Scattered fine gravel. (FILLANEATHERED OUTWASH) Sm Loo a, yellow brown, silty, fine to coarse gravelly, fine to coarse SAND, dry. (WEATHERED OUTWASH) Hand boring terminated at about 1 .5 feet below existing ground surface due to refusal on gravel/cobble. No ground water seepage was observed white advancing this hand boring. Dropweight Cone Penetration Test (DCP-1A) was advanced adjacent to the hand boring to a depth of 5.2 feet below the existing ground surface. S-1 MC A� OTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. mini J"10 0 20 40 60 80' .100 Water Content (%) Plastic Limit 1 .4 Liquid Limit Natural Water Content I GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-1 fMGEOSCIENCES INC. 665 EDMONDS WAY PAGE: I of I . EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 4 KANDHOL 2007-105.GPJ 7117/07 DRILLING COMPANY: HWA GeoSciences; Inc. CE ELEVATION: :I: feet DATEJWTED: 07/03/2007 DRILLING METHOD: Hand Auger DATEIMPLETED: 07103/2007 SAMPLING METHOD: Grab LOGGED BY: T. Taddese & D. Coltrane LOCATION: See Figure 2 U) 0) _J _W _J 0 M 0 Cl) Co Cn U) U) =3 0— ML Soft, brown, fine to medium sandy SILT, roots and rootlets, dry to moist. Scattered fine gravel. IFILLANEATHERED OUTWASH) --------- SM Loose, yellow brown, silty, fine to coarse gravelly, fine to coarse SAND, dry. (WEATHERED OUTWASH) 21 Loose, yellow brown, slighty silty, fine to coarse gravelly, fine Loose to coarse SAAND, dry. 3- 4- 5- 6- 7- 8- 9- 10- DESCRIPTION Hand boring terminated at about 2.2 feet below existing ground surface due to caving on loose materials. No ground water seepage was observed while advancing this hand boring. Dropweight Cone Penetration Test (DCP-2) was advanced adjacent to the hand boring to a depth of 3.8 feet below the existing ground surface. 0: Lu LU U x Lu M Q. z Lu Non -Standard Penetration Resistance D z U) 05 A U) Lu 0 17.6 lb weight 32.6" drop uJ uJ _J _J Lu Z' a- a. z UJI M 0 U) Lu Q. 0 W. (D uJ a 0 A A; S-2 MC A.' —2 GS 1-4 —3 —5 —6 [-7 NOTE: This log of subsurface conditions applies only at the specified location and on the date Indicated ii,,. , and therefore may not necessarily be indicative of other Umes and/or locations. 9 —10 0 20 40 60 80 100 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-2 HWAGEOSCIENCES INC 665 EDMONDS WAY PAGE: 1 of I EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 5 HANDHOL 2007-105.GPJ 7/17/07 DRILLING COMPANY: HWA GeoScienres Inc. SURFACE ELEVATION: i feet TE STARTED: 07/03/2007 DRILLING METHOD: Hand Auger E COMPLETED: 07/03/2007 SAMPLING METHOD: Grab 00GTGED BY: T. Taddese & D. Coltrane LOCATION: See Figu're 2 U) W U) L) M z W W Non -Standard Penetration Resistance D Cn (n d) z LU 17.6 lb weight 32.6" drop 0 ui 0 LLJ LU _J _J Cr z M U) EL Q. W 0 a. 2 L) ;� = 0 CL >_ Cn ui W W U) D DESCRIPTION U) a. 0 0 ML Soft, dark brown, fine to coarse sandy SILT, with brown fine to 0 coarse crushed volcanic gravel, rootlets, dry to moist. — — — — — — — LFILLL — — — — — — — — — - . . . . . . . 7 M Loose, brown, silty, fine to coarse gravelly, fine to medium SAND, dry, rootlets. 1 2- 3- 1 4- 1 5- 1 6- 1 7- I a- 1 9- 1 10- S-1 MC Utility top at 2.1 feet below existing ground surface. — — — — — — — — — — — — — — — — — — — Loose, rust mottled, yellow brown, slightly silty, fine to coarse S-2 gravelly, fine to coarse SAND, moist (WEATHERED OUTWASH) SP Loose, olive brown, fine to coarse gravelly, fine to medium S-3 SAND, moist. (OUTWASH) Hand boring terminated at about 4.0 feet below existing ground surface due to caving on loose materials. No ground water seepage was observed while advancing this hand boring, Dropweight Cone Penetration Test (DCP-3) was advanced adjacent to the hand boring to a depth of 7.0 feet below the e)dsbng ground surface. LN OTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. . A MC GS A MC :A A 3 4 —5 —6 7 8 9 L10 0 20 40 60 80 100 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content GEOTECHNICAL INVESTIGATION, HAND HOLE: COMMERCIAL DEVELOPMENT HH-3 HWAGEOSCIENCES INC. 665 EDMONDS WAY PAGE: I of I EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 6 HANDHOL 2007-,105,GPJ 7/17/07 01 DRILLING COMPANY: HWA GeoSciences Inc. SISCE ELEVATION: :I: feet DATEAKTED: 07/03/2007 DRILLING METHOD: Hand Auger DATOWLETED: 07/03/2007 SAMPLING METHOD: Grab LOGGED BY: T. Taddese & D. Coltrane LOCATION: See Figure 2 Lu a: uJ (L Non -Standard Penetration Resistance 0 z Lu a 17.6 lb weight 32.6" drop 0 LU Lu Co It z D CL Co 2 U) L) 3: UJ .2 X 0 Q: (L W W 0 >- U) U) D DESCRIPTION U) Q. ;a 0 0 a 0— 1 . . . . . . . . . . i r-O -\Sod. Loose, brown to light brown, silty, SAND with gravel, dry to moist, rootlets. (WEATHERED OUTWASH) I - - - - - - - - - - - - - - - - - - - - - - SM Loose, orange brown, SAND with silt and gravel, rootlets, S-1 moist 2- 31 1 4- 1 5- 6- 7- 8- 9- 1 '10- Sand becoming light yellow brawn at 3.6 feet below existing S-2 around surface. Hand boring terminated at about 3.7 feet below existing ground surface due to caving on loose materials. No ground water seepage was observed while advancing this hand boring. Dropweight Cone Penetration Test (DCP-4) was advanced adjacent to the hand boring to a depth of 5.5 feet below the existing ground surface. NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. & A; Ak' MC 2 A —3 A MC A; —4 A; I . . . - . - - - L-10 0 20 40 60 80 100 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-4 IWAGEOSCIEN . CES INC 665 EDMONDS WAY PAGE: I of I EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 7 HANDHOL 2007-105.GPJ 7117107 DRILLING COMPANY: HWA.GeoSciences Inc. SURFACE ELEVATION: DRILLING METHOD: Hand Auger --SAMI�LING METHOD:- Grab LOCATION: See Figure 2 i feet TE STARTED: 07103/2007 0 E COMPLETED: 07/03/2007 LOGGED BY: T. Taddese & D. Coltrane a) U) cc Lu Lu 0 W Q. z uj Non -Standard Penetration Resistance (D 0 r D z L) LU 17.6 lb weight 32.6" drop (D 2 0 U) . W _j W _j LU 0: z co U) 2 0 a. E o_ 2 2� Lu 0 a- >_ U) C3 U) D DESCRIPTION Lau Lu 0 0— 1 " * SM Loose, brown, SAND with silt and ..... roots and rootlets, wood 0 debris, dry to moist. (FILL) 2- 3- 1 4- 1 5- 1, 6- 7- 1 9- 1 10- SM Loose, light yellow brown, silty SAND with gravel, rootlets, dry to moist (FILLNVEATHERED OUTWASH) Increase in fine gravel and coarse sand content noted. SP Medium dense, olive brown, fine to medium SAND. Scattered coarse sand and fine gravel, moist. (ADVANCE OUTWASH) Sand becoming light yellow brown at 3.5 feet below existing ground surface. Hand boring terminated at about 4.1 feet below existing ground surface due to refusal on gravel1cobble. No ground water seepage was observed while advancing this hand boring. Dropweight Cone Penetration Test (DCP-5) was advanced from the bottom of hand boring to a depth of about 5.2 feet below the existing ground surface. i S-1 S-2 L NOTE: This log of subsurface conditions applies only at the specified locafion and on the date indicated . and therefore may not necessarily be indicative of other times and/or locations. MC I : MC GS M1=� 5 —7 0 20 40 60 80 1 00 Water Content Plastic Limit 1 , 0 Liquid Limit Natural Water Content GEOTECHNICAL-INVESTIGATION HAND HOLE: 'COMMERCIAL DEVELOPMENT HH-5 665 EDMONDS WAY PAGE: 1 of I' HWAGEOSCIENCES INC. 'EDMONDS, WASHINGTON PROJECTNO.: 2007-105-21 FIGURE: 8 HANDHOL 2007-105.GPJ 7/17/07 r1DRILLING COMPANY: HWA GeoSciences Inc. SWE ELEVATION: :l: feet DATESTED: 07/0312007 DRILLING METHOD: D LETED: 07/03/2007 SAMPLING METHOD: LOGGED BY: T. Taddese & D. Coltrane LOCATION: ca uJ z uJ Q. < U) d) co F_ Non -Standard Penetration Resistance 0 D z U) -5 V5 A U) 17.6 lb weight 32.6" drop a) _J 0 Cn Lu _J a. LLJ _J (L W Lu z M co Cn a. L) 0 Lu U) 0 co M DESCRIPTION U<) (LLU C) W (D W 0 0­11 1 . . . . . . . . . I F-0 2- 3- 4- 5- 6- 7- 8- 9- 10- Dropweight Cone Penetration Test (DCP-1B) was advanced adjacent to hand boring HH-1 to a depth of about 5.75 feet below the existing ground surface. OTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. I A A —3 A, A: —4 —5 6 [8 01� I . . . . . . . - t--- 10 0 20 40 60 80 100 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT DCP 1-B HWAGEOSCIENCES INC. 665 EDMONDS WAY PAGE: 1 of 1 EDMONDS, WASHINGTON PROJECTNO.: 2007-105-21 FIGURE: 9 HANDHOL 2007-105.GPJ 7/17/07 GRAVEL SAND SILT CLAY Coarse Fine Coarse Medium Fine cal - - 11111SM1111111"00111111 SYMBOL SAMPLE DEPTH (ft) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name % MC LL PL PI Gravel % Sand 0 YO Fines 0 I YO * HH-2 S-2 1.8-2.0 (SP) Light yellowish brown, poorly graded SAND 3 17.1 81.1 1.8 * HH-n3 S-2 3.0-3.5 (SP) Reddish brown, gravelly, poorly graded. SAND 5 35.7 59.4 4.9 A HH-5 S-� 3.0-3.5 (SP) Light yellowish brown, poorly graded SAND 1 4 1 1 11.3 1 84.91 3.8 GEOTECHNICAL INVESTIGATION PARTICLE -SIZE ANALYSIS =A COMMERCIAL DEVELOPMENT OF SOILS 665 EDMONDS WAY METHOD ASTM D422 fMGEOSCIENCES INC EDMONDS, WASHINGTON PROJECTNO.: 2007-105-21 F16URE: 10 City of EdmoncTs Permit Application Form Form A Per M.'it A.ppli.qAtion for, R. New ShTgle, Family n.� We rid r � R- 6 M.O: de I El GarAgi/Carport Grading cyds ed fifA fit I m-p-rovemen-ttCha nge of Use k8.d6iyIFiebi'hinq -Wall 6i6riSpecify) Brief Desc . tion: qtu'u 7 Site Address: t Sno County Tax Account Parcel #: Businessrrenant Name (if applicable): I PROPERTY OWNER: Eairin'6�7ddress. Phone: (&ZC2) -77377&939 FAX: f-1-05) CONTRACTOR: OSame:as P Mailing City: k Phone: State License Number APPILICANTMONTACT: Fill out the following informa -Erh"ew ComMpt 0,.Acrdiffdiv Repair 0.-!.:S.*r El Stbrage/Shed EJ P ire iysftm f Soecif Su ZIP. E-Mail: 117 Exp: Date: City Business License No: OSame as Property Owner OSame as Contractor City: State: Zip Phone.- FAX: (476) -7-70-36_32 E-Mail: _1'/14J,/S(0 L:\T—tNIPISUILDINGWEBchecklistsZFR.CONINI.APP.docSI24/2007 CITY OF EDMONDS COMMUNITY SERVIGA D9PARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT A. 9 Owner: HARVERD.& BESS GROSS. Na W65 EDMONQ'S' WAY erifiit No. 91'� 'c�271 Issue Date to -,1 -7 - B.' 0 Contractor: V-BUILT CONSTRUCTION CO.,' NaT,0. BOXXX 1 655-- ,Ma AIg Mailin Address NO 71A 98020 LY NWOOD, WA 98046 City State zip City State Zip V BUIL**128M9 546-0269 State License Number Telephone Number 9 Address or Vicinity of Construction:- In froht of 'residence at 665 Edmonds, Way, Edmonds, WA Type of Work to be Done: � Conversion of. sidewalk into 24' driveway $er City of E'dmonds reauirements. AeW4" CfA*'L4_. tr—bz I lz : .4 '/ el Work in -Connection With: u Ell S or Plat XX Single Family,. 0 City Projects-,. k El Multifamily 'El utility z Pavement Cut: El Y E3 N U APPLICANT TO READ AND, SIGN t� INDEMNITY: Applicant understands and by. his signature to this application; agrees to hold the City of Edmonds >- harmless from any injuries, damages, or claims of any kind or description whatsoever, forseen or unforseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this.permit. THE CONTRACTOR IS RESPONSIBLE FOR.. WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. 0 U Funds held from the Security Deposit (estimated restoration fee) will be held until the final street patch is completed' by City forces, at which time a d-ebit or credit will.be processed for issuance.to the applicant. 0 e A 24 hour notice is required for inspection'; Please call Public Works: 771-3202 9 Work is to be inspected during progress and at completion. e Restoration to be in accordance with City Code. 0 Street to be kept clean at all times. 0 Traffi� Control to be in accordance with City regulations... 'I street -cut ditches must be patched with asphalt or City approved material prior to end� of working day; no exceptions. I understand the aboye and that this must be available at the iob site for inspection.purl ses at all times. ignature: Date: -or C66tractor Owner This Permit Must Be Posted at the Job Site For Inspection Purposes Call DIAL -DIG Prior To Beginning Work z U C4 0 fJ4 ISSUED BY: L/717, ovya"-'�L� Time A uthorized: Void after -days. Special Conditions:(h sk - /I A, 44.r" r, 0//IPYI 4."11- '�" ALA f U Amendments - dl'lldleA Ili '/'� S lel"� 'q (ld'I'l Z/1 �;' r /I 1,/ &1. �4 A, tlf� X NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE. PERMIT FEE: "t 30. o 0 Security Deposit: Receipt No.: 015 ev Fund HlFee:� Street Cut Dimensions: Eng. Div. July I 1� wiiiia I I, 'jFu-!wI I I - Route copy to Street Dept.) FIELD INSPECTION NO* Comments: CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO Partial Work Inspection by P. W.: Work, Disapproved By: Date: FINAL APPROVAL BY: Date: Eng. Div. July 1985 APPLICATION for The City of Edmonds SIDE SEWER PERMIT EASEMENT No . .......................................... NEW CONSTRUCTION [] REPAIRS 0 A02 - 02 300 owNER... ......................... .................. CONTRACTOR .................................................................................................. PERMIT No . ...................... ADDRESS ... to-la.5 .... Edrn.anciz ..... Wci.q -------------------------------- LEGAL DESCRIPTION: LOT No . ........ ..................................... BLOCK No . ...................... ..................... NAMEOF ADDITION ............................................................................................. . .......................................... M ay., lot 12 DXQ, 'Tqs+aa on Sawar Approved: DATE................................................ By ............... ...................................................... ENGINEERING REPORT (Drainage and Grading Calculations) FOR Grow With Us Learning.Center .665 Edmonds Way Edmonds, Washington March 23, 2010 38608 -GIST gtoto Prepared by: Robert L. Long ��/.00 Lovell-Sauerland & Associates 1921736 th Avenue W. Suite 106 Lynnwood, W ashington 98036 LSA No. 5221 Grow With Us Learning Center 665 Edmonds Way Introduction This summary report provides site design information for the proposed redevelopment for a Grow With Us Learning Center. It includes storm drainage (infiltration trench) and grading analysis to support the conversion/expansion of a single family residence to a daycare facility and driveway/parking lot expansion. The property is located at 665 Edmonds Way in the southwest 1/4 of Section 25, T 27 N, R 3 E, W.M. ApplicantlOwner. Grow With Us Learning Center c/o Scott Andersen 21318 84t' Ave W Edmonds, WA 98026 (425) 772-2975 SECTION Site Address: 665 Edmonds Way Edmonds, WA 98020 Tax Parcel Number. 270325-003-080-00 TABLE OF CONTENTS PAGES A. Project Summary .............................................................................................................. I B. Development Site Plan ....................................................................................................... 2 C. Parcel (Vicinity) Map .......................................................................................................... 1 D. Aerial Photo ...................................................................................................................... 1 E. Stormwater Control System Summary and Calculations ................................................... 6 F. Drainage Basin Description and Maps .............................................................................. 3 G. Grading and Erosion Control Summary and Grading Calculations ..................................... 4 H. Operation and Maintenance Guidelines ............................................................................. 4 1. Geotechnical Evaluation (July 18, 2007) and Design Infiltration Rate (March 3, 2010) .... 24 Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report. 665 Edmonds Way LSA No. 5221 111.01F! March 2010 PROJECTSUMMARY. The total site consists of about 12,824 sf (0.2944 acres) and is currently occupied by a single family residence. The existing single family residence is surrounded by lawn, mature trees and landscaping. The site is bordered by single family lots 'to the south and east, a construction company business to the north, and Edmonds Way (SR 104) right-of-way to the west. Access to the site is from Edmonds Way via a loop driveway along the site's westerly boundary. The site generally slopes from northeast to southwest. The very. back corner of the site drops about three feet in the easterly most 40 feet of the site and then is relatively flat dropping less than two feet in remaining 100 ft to 180 ft of the site. Stormwater run-off from the site sheet flows in a westerly direction with no signs of a defined channel. Some of the site's runoff appears to drain off in a southeasterly direction across neighboring residential properties. Runoff flows for the existing driveway would flow in a westerly direction towards Edmonds Way. The existing gutter of Edmonds Way flows in a southeasterly direction along the site's frontage. No stream or wetlands were discovered on or immediately adjacent to the site. Additional discussion of the local drainage basin and downstream path is discussed in section F of this report. Existing Features Summary: a. Site Area .................................................................................... 12,824 sf (0.294 acres) b. Offsite tributary area to the site: Negligible from neighboring properties to the east. c. Soil Hydrologic Type: Everett — gravelly sandy loam— hydrologic group A (see section G) The proposed project includes conversion of the existing residential structure to a daycare facility by adding about 850 sf floor area and reconstructing the driveway and parking area. The reconstructed driveway would add parking stalls, a trash enclosure area, and restrict the loop driveway to one-way traffic flow with an entrance (southeast access point) and exit (northwest access point). Frontage improvements along Edmonds Way already exist and only new driveway cuts and ramps will be reconstructed. Infrastructure improvements include reconstructed driveway and access points; storm water collection, conveyance and infiltration trench to control stormwater runoff; and possible reconnection of the typical utilities- water, sewer, gas, electric, and communication services as needed. Nearly all existing vegetation will be removed during grading activities in the development area of the site; some existing vegetation may be retained along the site's property lines. Landscaping and grass lawn around the new house will stabilize the site upon building. construction. A storm drainage collection and infiltration trench will be installed just west of the existing building. All roof top drains and runoff flows from the driveway area shall be routed to the proposed infiltration trench. See section E for additional evaluation of the storm drainage control system. Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665.Edmonds Way LSA No.5221 L.OR March 2010 A-1 L TESC I rGEND @ M 226TH STREET S.W. GRADING OUANT171ES: j�l I k _(/ZL TFT', LEO L�,dl—S�unl.nd .4 i. & Associates, lnc� f i BASIS OF SEA -RINGS LEGAL DESCRIPTION 13ENCZ IATARK r'gy - T --ant SURVEY NOTES _­T M ­T X----------------- CONSTRUCTION SEOUENCE ^=;: 111,91. Q� :'.-1 7 L'T 6 < X=1=1 ==,A�l _j Q_ 0 9L� APPUCANT/OWNER ZONING' T Z 0 LOT AREA w 0 (o SITE ADDRESS TAX PARCEL —i Z� L>j Li FNCANEER /SURVEYOR APPROVED FOR CONSTRUCTION CITY OF EDMONDS z Li 0 z 7 Lf) W z z I'l 2 2 c� -, LLJ Z C'4 0 ou z >- m 0 -- p G) Ul L) m Li 0 V) m 0 z U71 3: U) " . T5221.2 ON- :.ar 7. M —.a K m_._ "W! & 4="' =x 1. 1 2 f I 21 89:2- EROM AND SIMPANT-mmm (m) Nom L r. W M 9, --. A r--. W- SW 1/4 . 114, T ­T Nab.. V-1 -"T --n., 1� EE -"V�V TS ---T. -­-. =--L _ _ I_ T`r-�'OF. ED IT 141244P, S59TIT22k: s.- AI.I.. 1­1 ­T­ I—— TK ­3­­ K­ Lcl:TY­QF� EDAIONDS,;:,�. J=e�� ST774DARD DETAIL 3/4;Z W1 A-, b A­IJ PR� .'­�TAIL.(�). Wo). 0&/­Xs W.RAI. MTRA71014 7RENCH Ic DRI.Al .1. :1".. -1 .1 C IC.TA.. ­­T-S - DET­Etl.I 11 TWS C- .­ AINDARD -M . _j U= I T F E D NA 0 N DS�: APPROVED FOR CONSTRUCTION CITY OF EDMONDS LER Lovell—Sauerland & Associates, ­7 �-='A'­ z 0 z Ln 2: C' co 0 0 >: 0 Z.z uJ Z u- -_j L_ =) z '00 u Z 0 0 V) u m > w 0 V) = 0 z Ln t: V) AS SHO 5292 21 .2 QUARTER IUWN�"W'W*�U r SIA 27 3 NW-25-274 13 Of t 14 12 10 --22(YTH-- ST�--SW--- L E 1 VI 2 A D DI 5 I 5 6 0 3-001 b %, EL 3 4 66 2 2 .. 4 7 CO VIEW' -EL&I- 0 3 uj 3 1: 3 A 5472 2 4 14 13 ZZ — ------- 4L LLA 3 D 5 4 d 6 2 12 11 6 3 6 4 ��LJ 4 22 7 17 1 2 7 8 8 5 7 12 6 z 5 is L 8 )," .— �- 6 3 10 9 �2 10 7 CW PL CH TRIDO . . !; ; W 9 0 10 3-036 6 5 3-038 Z MICH I 12 Fp (6556) 088) 3-�41 -039 7 6 ej of 022 7 �u 11 PAR 13 14 5 1 1 2 7 5 3 6 10 Is 08 3 2 8 3 I . 01 4 7�7 5 9 1 . ..... 13 BI I N r 16 12 11 10 3 14 2 1 01 (Q; C 0 Do 3 WAY 13TH SW 072 3-141 3-04 3 1 2 3 3-05 4 11 10 9 8 7 14TH 17 is I 3-160!346 13 , 2 3 I Yb 3- 1 17 1 2 2 08 3 1< (a ir 1 2 16 171 31 17 14TW WAY 7 aUCY. 7 L -2-2 7 4 5 6 s 6 St �j 9 10 9 3 2 4 17 Q 31) P -14813-10 PIN 3 q 9A 7 5 9- -LU2 z 8 to 26ih 4 6 5 t�t,. 3 7— 3 7 �c , , c%) _ 4 6 2_ C.) rz. CY 1 1 2 2 26 3 3-062 �-227TK 2 25 3-122 3-123 1 -112 27 00 ------- 3-113 LL-2000-134 21 02 U) R 8 Qq 0 PARK— ��;,2 '2 5 Parcel icin ap NW-36-27-3 Lovell-Sauerland and Associate s Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 C-1 1 14 S Vl 4 & "T, k *42 JO W, , QjI r it Alk r 46 41 -Ww J or 0 71" rLIn Ur 15 11b.0 V j Aerial Photo (June 2007) Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No. 5221 March 20 10 S TORMWA TER CON TROL S YS TEM S UMMA R Y A ND CA L CULA TIONS: The project proposes to create, replace and/or retain 8,450 sf of impervious surface on -site. To mitigate the re -development of the site, an infiltration system will be installed to control the drainage runoff. All of the on -site impervious surfaces shall be collected and routed to an on -site infiltration system. The proposed 89 ft (1) x 6 ft (w) x 3.0 ft (d) infiltration trench has been designed to completely disperse the 1 00-year 24-hour design storm on -site. Therefore, the project will have no "effective impervious" surface that impacts the City's drainage system. The on -site infiltration trench is to be constructed per the City of Edmonds' standard practices. The length of the trench is dependent upon the designed infiltration rate of the native soils and the collection area conveyed to the trench. SCS soil survey designates the area soils as an Everett (#17- type A) soil. The site specific geotechnical evaluations (attached in section 1) confirms the type A sandy soils. In accordance with the soil evaluation a design infiltration rate of 2 in/hr has been used to size the on -site infiltration trench. Site Area Summary., Total Site Area = 12,824 sf Proposed Impervious = 8,450 sf Building Addition, Patio and Walk = 1,509 sf Existing House = 1,441 sf Driveway / Parking = 5,500 sf Proposed Pervious = 4,574 sf (Lawn and landscape) Inflitration Trench Design Summary, Table: Total Site Area Proposed Impervious Area Proposed Pervious Area Developed Storm Events (SCS Unit Hydrograph) Peak Storm Runoff Rates Total Storm Volumes Infiltration Trench Design (89'x 6'x 3') Provided Storage Volume (30% voids) Infiltration Rate (2 in/hr over 89'x 6' bottom area) 12,824 sf (0.294 acres) 8,250 sf (0.189 acres) 4,574 sf (0. 105 acres) 2 year 10 year 100 year 0.06 cfs 0.08 cfs 0.13 cfs 894 cf 1,279 cf 2,109 cf 480 cf 0.0247 cfs Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 L. a FRI March 2010 E-1 TO 1-1/2- FRAME & WASHED ROCK A-" GRATE 6" FROM BUILDING D 0 - - - - - - - - - - - - ------------- OIL/W17ATERSEPARATOR T 'L 1W TEE, SEE DETAIL lz M 284.00 281.00 A--4-j - - - - - - - - - - - Q-"' PROFILE WRAP SIDES & TOP NTH FILTER FABRIC TYPAR 3401, AMOCO 4545 OR APPROVED EQUAL 6" PERFORATED PVC PIPE WASHED ROCK 3/4" - 1-1/2" SECTION A -A INFILTRATION TRENCH DETAIL 6'(W) x 89'(L) x 3.0'(D) N. T. S. 89*-6" PVC PERFORATED PIPE 00.00% 6" FROM BUILDING TYPE 1-L CB 6" PVC REMOVABLE PLUG 11' VENT HOLE-- 6" PVC FACTORY TEE 282.50 ED LEfjF0RA-L- PIPE 6' PVC PIPE �0 GROUT G� 6 PVC PIPE OIL/WATER SEPARATOR TEE Lovell-SaueHand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way March 2010 LSA No. 5221 L. M RE E-A Infiltration Bed Design: Size = 89ftx6ftx 3ft Storage Volume (30% voids in W to 1-1/2" rock) = 480 cf Existing Soils Sand with gravel and trace silt Test Pit #HH-5 (see attached geotech report) Sand = 95.5% Silt = 3.5% Clay = 1.0% USC Soil Classification SP USDA Textural Triangle = Sand (less than 10% silt/clay) Per DOE Stormwater Management Manual, 2005 Volume 111, Table 3.7 a USDA Textural Sand Classification designates a 2 in1hr long-term (design) infiltration rate (see attached geotechnical report and memo in section I of this report) Bed Infiltration Rate: Bottom Surface Area = 89 ft x 6 ft = 534 sf Soil Infiltration rate = 2 in/hr Bed Infiltration rate = 0.0247 cfs (534 sf x 2 in/hr . 12 in/ft . 3600 sec/hr) Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 F-3 STAGE STORAGE TABLE RECTANGULAR VAULT ID No. TRENCH Description: INFILTRATION TRENCH Length: 89.00 ft. Width: 6.00 ft. voids: 0.300 STAGE --STORAGE-- (ft) --- cf-- --Ac-Ft- 281.00 0.0000 0.0000 281.80 128.16 0.0029 282.60 256.32 0.0059 283.40 384.48 0.0088 281.10 16.020 0.0004 281.90 144.18 0.0053 282.70 272.34 0.0063 283.50 400.50 0.0092 281.20 32.040 0.0007 282.00 160.20 0.0037 282.80 288.36 0.0066 283.60 416.52 0.0096 281.30 48.060 0.0011 282.10 176.22 0.0040 282.90 304.38 0.0070 283.70 432.54 0.0099 281.40 64.080 0.0015 282.20 192.24 0.0044 283.00 320.40 0.0074 283.80 448.56 0.0103 281.50 80.100 0.0018 282.30 208.26 0.0048 283.10 336.42 0.0077 283.90 464.58 0.0107 281.60 96.120 0.0022 282.40 224.28 0.0051 283.20 352.44 0.0081 284.00 480.60 0.0110 281.70 112.14 0.0026 282.50 240.30 0.0055 283.30 368.46 0.0085 STAGE DISCHARGE TABLE DISCHARGE LIST ID No. INFIL Description: INFILTRATION RATE FOR 89'X6' STAGE <--DISCHARGE-> (ft) --- cfs- 47 282.00 0.0247 283.00 0.0247 284.00 0.0247 LEVEL POOL TABLE SUMMARY MATCH INFLOW -STO- -DIS- <-PEAK-> OUTFLOW STORAGE < ---- - -- DESCRIPTION -------- > (cfs) (cfs) --id- --id- <-STAGE> id (cfs) VOL (c� 2 YEAR ....................... 0.00 0.06 TRENCH INFIL 281.54 1 0.03 85.72 cf 10 YEAR ...................... 0.00 0.08 TRENCH INFIL 282.04 2 0.03 166.93 cf 100YEAR ..................... 0.00 0.13 TRENCH INFIL 283.99 3 0.03 478.24 cf 100 Year 24-hour design storm has a peak stage of 283.99 (2.99 ft) in the, trench. Lovell-Sauerfand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 1. S R March 2010 Grow With Us Learning Center- 665 Edmonds Way LSA No. 5221 SCS Weighted average curve number calculations March 2010 SCS Soil = Everett Gravelly Sandy Loam SCS Hydrologic Soils type:- A Areas Sq. Ft. Ac. % of Site Area Site area 12,824 0.294 100.0% Existing conditions Assumptions: CN: Undisturbed forest land 42 Second growth forest 55 Meadow or pasture 65 Grass, > 75% coverage (50% off -site collected areas) 68 Grass, > 50% coverage 100 Open water 81 Impervious (Ex. House to be remodeled 98 Future conditions Assumptions: Undisturbed forest land Second growth forest Meadow or pasture Grass, > 75% coverage Grass, > 50% coverage Open water Impervious Total Weighted CN Pervious: Area, acres Percent pervious area Weighted CN Impervious: Area, acres Percent impervious area Weighted CN Area (sf) 11,383 1,441 59.8 0.261 8&8% 55.0 0.033 11.2% 98.0 Total Site area 12,824 CN: 42 55 65 68 77 100 98 Day Care Building, Patio, Walk 2,950 Driveway 5,500 Total Weighted CN: Pervious: Area, acres: Percent pervious area: Weighted CN: Impervious: Area, acres: Percent impervious area: Weighted CN: 4,374 8,450 87.8 0.100 34.1% 68.0 0.194 65.9% 98.0 Lovell-Sauerland and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way March2010 r-s LSA No. 5221 Grow With Us Learning Center LSA No. 5221 Developed Condition Design Storms DETAIL BASIN SUMMARY BASIN ID: D002 NAME: DEVELOPED 2 YEAR SCS METHODOLOGY TOTAL AREA ....... : 0.29 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... TYPEIA PERV IMP PRECIPITATION .... 1.50inches AREA..: 0.10Acres 0.19Acres TIME INTERVAL .... 10.00 min CN .... : 68.00 98.00 TC .... : 5.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.06 cfs VOL: 0.02 Ac-ft TIME: 490 min BASIN ID: D010 NAME: DEVELOPED 10 YEAR SCS METHODOLOGY TOTAL AREA ...... * : 0.29 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE ...... TYPE1A PERV IMP PRECIPITATION .... 2.00inches AREA..: 0.10Acres 0.19Acres TIME INTERVAL .... 10.00 min CN .... : 68.00 98.00 TC .... : 5.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAK RATE: 0.08 cfs VOL: 0.03 Ac-ft TIME: 500 min BASIN ID: D100 NAME: DEVELOPED 100 YEAR SCS METHODOLOGY TOTAL AREA ....... : 0.29 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... TYPE1A PERV IMP PRECIPITATION .... 3.00inches AREA..: 0.10Acres 0.19Acres TIME INTERVAL .... 10.00 min CN .... : 68.00 98.00 TC .... : 5.00 min 5.00 min ABSTRACTION COEFF: 0.20 PEAKRATE: 0.13cfs VOL: 0.05Ac-ft TIME: 490min Lovell-Sauerfand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 L.MIR March 2010 DOWNSTRAM DRAINAGE DESCRIPTION: The site is located in the downstream portion of the Edmonds Way watershed basin. The Edmonds Way basin is a large urban basin that collects stormwater runoff from commercial and residential areas along Edmonds Way (SR-104) in the south portion of the City (see attached watershed map). Current storm runoff from the site sheet flows southwesterly to Edmonds Way. The gutter line along the east side of Edmonds Way directs the run off in a southeasterly direction to a catchbasin inlet near the southeast corner of the. site. The runoff enters a 48" storm pipe conveyance system that directs the flows northwesterly in a man-made pipe and catchbasin system. The system continues northwesterly along Edmonds Way about 4,500 ft; near the intersection of Pine Street, the system diverges westerly out of the Edmonds Way right-of-way. The system ultimately discharges to Puget Sound on the south side of the City Marina. Majority of the downstream system consists of a man-made pipe and catchbasin system. No apparent flooding or system inadequacies within a % mile down stream of the site were discovered during site visits or research of the downstream system. See attached watershed and downstream drainage map for the local downstream path. Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 L.WR March 2010 �1�7 . ZV*Nlw 1331 1330 1329 1260 1261 557 1350 12-74* 694 690 697 715 1345 719 12 13 707 N 12 1080 121 1355 631 641 691 13 12-316 556 0 13 . 1 10 681 704 720 12-109* 12-110a 12-7ol3TH WY. 722 7,?8 541 708 560 1371 620 630 640 650 660 670 710 724 728 601 619 641 643 749 1218 S (0 647 753 75,7 761 7691 1 744 620 14TH WY S 635 740 550 12-217 12-8 12-6 k '39 600 \0 0 645 736 12-7 60 651 73? I _e9d 739 756 760 1416 731 721 713 1420 -87a 1! 10609 bl/ 655 14TH WY S - 12 5Z- - 10503 10521 630 j IT 7.28 724 720 727 10703 665 4 10607 12- 83a 10525 660 V 723 -84 N 717 10705 12-4 S\� 10605 10519 10431 12- S I It 0 C:�§ 0 C=3 a t=l a S W 12-10 1 2-82a 724 728 1 0 el 710 22604 0 22605 22606 0% 12- 12-3 150 15-Oi 1041.5 700 20615 2,2616 12-12 70 (3 -i2--207 12-206 226TH PL SW 10404 72? 74.( 12-205 i�tn-_Lj 22625 1508 2-203A 22630 > IZ3 10406 745 LOLD631 <rL .02631 1041 741 A l(i P,26g?8 2-203 .22703 22704 2-2 728 7 I 22703 12-13 22712 740. Downstream Map Lovell-Sauerland and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No. 5221 March 2010 V-3 Grading and Erosion Control: This project will require grading to construct the proposed building expansion; reconstruct the driveway and parking area; and install the stormwater infiltration trench. Standard erosion control measures are proposed to be used during construction. The primary erosion and sediment control BMP during construction will be proper soil stabilization methods. Exposed soils shall be stabilized byapplication of effective bmp's that protect the soil from the erosive forces of raindrops, flowing water, and wind. Applicable practices include, but not limited to, temporary. and permanent seeding, sodding, mulching, plastic covering, erosion control fabrics, matting, soil application of polyacrylamide (pam) , the early application of gravel base on areas to be paved, and dust control. The contractor shall select a soil stabilization method best suited for the particular situation. Stock piles must be stabilized and protected with sediment trapping measures. In addition, site containment of exposed soils shall be sustained by using silt fence barriers along the down -slope boundaries of the site's disturbance areas. See the site development plan for details. Estimated -grading cakulations: Minimal project grading is expected due to nature of the project (a redevelopment project) and the relatively flat site. The attached calculations were performed using and average horizontal areas.(slice method). The quantities listed are for the permitting process only and should not be considered precise amounts for bidding purposes. The estimated grading quantities are: - Approximate Cut: 250 CY Approximate Fill: 100 CY Conclusion: Included in the site development construction plans are specific grading and drainage improvement notes and details. With proper installation, maintenance and inspections of the proposed construction the project should have minimal impact to the surrounding environment. Lovell-Sauerfand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 L.OR March 2010 6-1 28 T " Z4 W6od 4 vW, 4 0* lit. Soils Map Lovell-Sauerland and Associates Engineering and Drainage Report LSA No. 5221 Grow With Us Learning Center 665 Edmonds Way March 2010 G -01 SOIL SURVEY OF SNOHOMISH COUNTY AREA, WASHINGTON UNITED STATES DEPARTMENT OF AGRICULTURE, SOIL CONSERVATION SERVICE Everett Series- Gravelly Sandy Loam, 0 to 8 percent slopes (soil #17- Hydrologic Group "A") This very deep, somewhat excessively'd rained soil is on terraces and outwash plains. It formed in glacial outwash. Areas are long and narrow and are oriented in a northwest to southeast direction. They at 10 to 40 acres in size. The native vegetation is mainly conifers. Elevation is near sea level to 500 feet. The average annual precipitation is about 40 inches, the a verage annual air temperature is about 50 degrees F, and the average frost -free season is about 170 to 190 days. Typically, the surface layer, where mixed to a depth of about 6 inches, is dark brown gravelly sandy loam. The subsoil is dark brown very gravelly sand loam about 12 inches thick. The upper part of the substratum is brown very gravelly sand about 5 inches thick. The lower part to a depth of 60 inches or more is dark brown extremely gravelly sand. In some areas the substratum is weakly cemented. Included in this unit are small areas of Alderwood soils on till plains, Indianola soils on terraces and outwash plains, and Ragnar soils on outwash plains. Included areas make up about 15 percent of the total acreage. Permeability of this Everett soil is rapid. Available water capacity is low. Effective rooting depth is 60 inches or more. Runoff is slow, and the hazard of water erosion is slight. This unit is used mainly as woodland. It is also used for urban development and for hay and pasture. Douglas -fir is the main woodland species on this unit. On the basis of a 100-year site curve, the mean site index is 141. On the basis of a 50-year site curve, the mean site index is 111. The mean annual increment at culmination (CMAI) for Douglas- fir age 65 is 146 cubic feet per acre. Among the trees of limited extent are western hemlock, western redcedar, and red alder. The common forest understory plants are salal, brackenfem, red huckleberry, common rose, and Oregon -grape. This unit is well suited to year-round logging. Logging roads require suitable surfacing for year round use. Rock for road construction is readily available on this unit. Seedling mortality is the main limitation in the production of timber. Refores tation can be accomplished by planting Douglas -fir seedlings. High soil temperature and low soil moisture content during the growing season cause a high mortality of seedlings. When openings are made in the canopy, invading brushy plants, if not controlled, can delay the establishment of seedlings. If this unit is used for hay and pasture, the main limitations are slope, low available water capacity, and low soil fertility. Rotabon grazing, proper stocking rates, weed control, and fertilizer are need for maximum quality forage. Supplemental irrigation is also needed. Periodic mowing and spreading of the droppings help to maintain uniform growth and discourage selective grazing. Fertilizer is needed for optimum growth. The main limitation for homesites and septic tank absorption fields is steepness of slope. If the density of housing is moderate to high, community sewage systems may be needed to prevent contamination of water supplies as a result of seepage. Septic tank absorption lines should be installed on the contour. This map unit is capability subclass VIs. Lovell-Sauerfand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No. 5221 March 2010 C7 Grading Quantity Estimation Grow With Us Learning Center- 665 Edmonds Way LSA No. 5221 March 2010 Site Grading for Building Foundation Cut Area Fill Area Volume of Volume of Volume of Volume of Elevation at Elev. at Elev. Cut, CF Fill, CF Cut, CY Fill, CY 284.5 0 0 0 0 0.0 0.0 284.5 860 0 0 0 0.0 0.0 286.5 860 0 1,720 0 63.7 0.0 286.5 0 0 860 0 31.9 0.0 2,580 0 96 0 Site Grading for Rear Yard Cut Area Fill Area Volume of Volume of Volume of Volume of Elevation at Elev. at Elev. Cut, CF Fill, CF Cut, CY Fill, CY 286.5 0 0 0 0 0.0 0.0 287.0 470 0 118 200 4.4 7.4 288.0 210 0 340 0 12.6 0.0 289.0 275 0 243 0 9.0 0.0 290.0 10 0 143 0 5.3 0.0 290.5 0 0 206 0 7.6 0.0 1,049 200 39 7 Site Grading for Rear Yard Cut Area Fill Area Volume of Volume of Volume of Volume of Elevation at Elev. at Elev. Cut, CF Fill, CF Cut, CY Fill, CY 285.5 0 0 0 0 .0.0 0.0 286.0 2,500 0 625 200 23.1 7.4 287.0 0 0 0 0 0.0 0.0 625 200 Additional Cut/Fill for Infiltration Trench Cut/Fill Match= 89 x 6 x 4.5 = 2,403 cf 89 C.Y. Approximate Total Quantities: CUT= 250 C.Y. (96 + 39 + 23 + 89) FILL = 100 C.Y. (89+7) 23 7 Lovell-Sauerland and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 G-4 Grow With Us Learning Center (665 Edmonds Way) Operation and Maintenance Requirements: This manual is intended to provide guidance to the owner(s) for the operation and maintenance of the drainage and the stormwater detention storage facilities for the Grow With Us Learning Center (665 Edmonds Way). The owner is responsible for maintenance of storm drainage facilities within the property. The owner is not responsible for maintenance within the public right-of-way. This manual is not comprehensive. Although it explains the intended operation of the various components of the drainage system, and suggests a routine of inspection and maintenance, it cannot anticipate every problem. Once a historical record of maintenance is established, it may be prudent to alter the routine. It is recommended that maintenance records be kept, and that the records be reviewed periodically. Concept of Operation: The drainage design is shown and described in the final site development engineering plans and report. The approved site development plans and report should be retained as part of this document and used as a reference to identify drainage facilities mentioned in this manual. Stormwater Infiltration Trench System. The onsite infiltration trench system consists of an underground rock filled trench with a 6" perforated dispersion pipe running through the center. The infiltration trench is located under the proposed driveway and parking area between Edmonds Way and the onsite building. The infiltration trench system has been designed to completely infiltrate the 100-year 24-hour storm event. If an extraordinary event was to occur the catch - basins at the ends of the trench would overtop and overflow into the street system. Recommended Inspections of Facilities. The following are inspection guidelines for the drainage system. The inspections should occur prior to the winter rain season, leaving sufficient time to correct any detected maintenance problems, and at the end of the season to determine the effect of the season's runoff. Once a historical basis is developed the frequency of inspection may be modified as necessary. For additional and updated maintenance information visit the Washington State Department of Ecology's web -site at: http://www.ecy.wa.gov/programs/wq/wqhome.htmI Lovell-Sauerfand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 CATCH BASINS Maintenance Results Expected When Component Defect Conditions When Maintenance is Needed Maintenance is Performed General Trash & Debris Trash or debris of more than % cubic foot which is No trash or debris located immediately in front of (includes located immediately in front of the catch basin catch basin opening. Sediment) opening or is blocking capacity of the basin by more than 10%. Trash or debris (in the basin) that exceeds 1/3 the No trash or debris in the catch basin. depth from the bottom of basin to invert the lowest pipe into or out of the basin. Trash or debris in any inlet or outlet pipe blocking Inlet and outlet pipes free of trash or debris. more than 1/3 of its height. Dead animals or vegetation that could generate No dead animals or vegetation present within odors that could cause complaints or dangerous the catch basin. gases (e.g., methane). Deposits of garbage exceeding I cubic foot in No condition present which would attract or volume. support the breeding of insects or rodents. Structure Damage Corner of frame extends more than 3/4 inch past Frame is even with curb. to Frame and/or curb face into the street (if applicable). Top Slab Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks. Cracks wider than 1/4 inch (intent is to make sure all material is running into basin). Frame not sitting flush on top slab, i.e., separation Frame is sifting flush on top slab. of more than 3/4 inch of the frame from the top slab. Cracks in Basin Cracks wider than % inch and longer than 3 feet, Basin replaced or repaired to design standards. Walls /Bottom any evidence of soil particles entering catch basin through cracks, or maintenance person judges that structure is unsound. Cracks wider than Y2 inch and longer than 1 foot at No cracks more than 1/4 inch wide at the joint of the joint of any inlet/outlet pipe or any evidence of inlet/outlet pipe. soil particles entering catch basin through cracks. Sediment/ Basin has settled more than I inch or has rotated Basin replaced or repaired to design standards. Misalignment more than 2 inches out of alignment. Fire Hazard Presence of chemicals such as natural gas, oil and No flammable chemicals present. gasoline. Vegetation Vegetation growing across and blocking more than No vegetation* blocking opening to basin. 10% of the basin opening. Vegetation growing in inlet/outlet pipe joints that is No vegetation or root growth present. more than six inches tall and less than six inches apart. Pollution Nonflammable chemicals of more than 1/2 cubic foot No pollution present other than surface film. per three feet of basin length. Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Wa� LSA No. 5221 March 2010 CATCH BASINS (continued) Maintenance Results Expected When Component Defect Conditions When Maintenance is Needed Maintenance is Performed Catch Basin Cover Cover Not in Place Cover is missing or only partially in place. Any Catch basin cover is closed. open catch basin requires maintenance. Locking Mechanism cannot be opened by on maintenance Mechanism opens with proper tools. Mechanism person with proper tools. Bolts into frame have Not Working less than % inch of thread. Cover Difficult to One maintenance person cannot remove lid after Cover can be removed by one maintenance Remove applying 80 lbs. Of lift; intent is keep cover from person. sealing off access to maintenance. Ladder Ladderrungs Ladder is unsafe due to missing rungs, Ladder meets design standards and allows Unsafe misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate with opening wider than 7/8 inch. Grate opening meets design standards. (if Applicable) Trash and Debris Trash and debris that is blocking more than 20% of Grate free of trash and debris. grate surface. Damaged or Grate missing or broken member(s) of the grate. Grate is in place and meets design standards. Missing Lovell-Saueriand and Associates Engineering and Drainage Report LSA N6.5221 Grow With Us Learning Center 665 Edmonds Way U M R. March 2010 H CONVEYANCE SYSTEMS (PIPES & DITCHES) Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is Performed Pipes Sediment & Debris Accumulated sediment that exceeds 20% of the Pipe cleaned of all sediment diameter of the pipe. and debris. Vegetation Vegetation that reduces free movement of water All vegetation removed so water flows freely through pipes. through pipes. Damaged Protective coating is damaged; rust is causing Pipe repaired or replaced. more than 50% deterioration to any part of pipe. Any dent that decreases the cross section area of Pipe repaired or replaced. pipe by more than 20%. Open Ditches Trash & Debris Trash and debris exceeds 1 cubic foot per 1,000 Trash and debris cleared from ditches. square feet of ditch and slopes. Sediment Accumulated sediment that exceeds 20% of the Ditch cleaned/flushed of all sediment and debris design depth. so that it matches design. Vegetation Vegetation that reduces free movement of water Water flows freely through ditches. through ditches. Erosion Damage to See "Ponds" Standard. See "Ponds" Standard. Slopes Rock Lining Out of Maintenance person can see native soil beneath Replace rocks to design standards. Place or Missing (If the rock lining.. Applicable) Catch Basins See "Catch Basins" Standard. See "Catch Basins" Standard. Debris Barriers See "Debris Barriers" Standard. See "Debris Barriers" Standard. (e.g., Trash Rack) For additional and updated maintenance information visit the Washington State Department of Ecology's web -site at: http://www.ecy.wa.-qov/programs/Wq/Wqhome.htmI Lovell-Sauertand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No. 5221 L. M R. March 2010 H-1 July 18, 2007 HWA Project No. 2007-105-21 Anderson Development 23632 Highway 99, # F-502 Edmonds, Washington 98026 Attn: Mr. Scott Anderson Subject: GEOTECIINICA-L INVESTIGATION Commercial Development 665 Edmonds Way Edmonds Washington 98020 Dear Mr. Anderson: At your request, HWA GeoSciences Inc. (HWA) has undertaken and completed a geoteclu-dcal investigation within your existing residential lot, for your proposed commercial development in Edmonds, Washington. This investigation has been perfon-ned in support of the application required to obtain a building permit from the City of Edmonds for the proposed 4,800 square foot, two-story, cornn-iercial building at the subject site. For the purposes of this investigation, HWA performed a review of pertinent geologic maps for the site area, conducted a site reconnaissance to observe local topographic features, excavated 5 shallow hand borings, and conducted 5 DCP (Dropweight Cone Penetrometer) soundings to delineate in situ density/strength conditions of the site soils C� t;' within the footprint of the proposed development. PROJECT LOCATION The subject property presently consists of a developed 0.39 acre lot, located within the SW '14, Section 25, Township 27 N, and Range 3 E; situated at municipal address 665 Edmonds Way, in Edmonds,. Washington (Snohomish County No. 2703250003080000). The approximate site location is depicted on Figure 1, the Project Site & Vicinity Map. 19730 - 64th Avenue..XM ::Stiit6260 Lynnwood, WA 98036.5957 Tel: 4 25.774. 0 106. Fdx:..425:774.27J4,;'.:� wwwmvageosciencesxor� R-4� July 18, 2007 HWA Project No. 2007-105-21 PROPOSED DEVELOPMENT As currently proposed, the new development will consist of a single 4,800 square foot, two-story, commercial building situated over the footprint of the existing residential structure, as shown on Figure 2, the Site & Exploration Plan Map. SITE OBSERVATIONS Currently, an existing one-story wooden residential structure, built in 195' ), occupies a footprint area of approximately 1,441 square feet in the central portion of the roughly 17,000 square foot lot. The con-unercial development will require demolition of the existing residential structure. The lot is relatively level in the fi-ont and ascends a slope in the backyard in the northeast comer. GEOLOGY The published geologic map for the site area, "Composite Geologic Map of the Sno-King Area", prepared by Booth, et al, 2004, shows that the site vicinity is underlain by Vashon advance outwash. Advance outwash deposits consist of chiefly gray, clean to slightly silty, fine to medium sand, with varying percentages of gravel. These materials were deposited in pro -glacial streams as the Vashon Stade ice advanced southward in Puget Sound. In general, the sediments are coarser at higher levels of the unit, because the streams deposited- larger materials closer to the ice front. Because these granular soils were over -ridden by the Vashon Stade ice, they are dense to very dense. They are quite permeable; however, they are not always water -bearing. Advance outwash is generally competent for support of structures, and excavates relatively easy with conventional excavation equipment. Although sideslopes in this sand stand near -vertical temporarily where dry, shoring is necessary for long-term support. SOILS According to the Soil Conservation Map for Snohomish County (NRCS, online web soil survey, 2007), the site is overlain by Everett gravelly sandy loam on 0 to 8 percent slopes. The Everett gravelly sandy loam soils formed on glacial outwash. The rate of runoff is slow and the erosion hazard is slight for these soils. SITE EXPLORATION On July 3 d , 2007, HWA geologists conducted a limited shallow hand -exploration program to evaluate near -surface conditions on the site. At that time, 5 hand borings were conducted to depths ranging from 3.0 to 4.8 feet, before refusing on coarse gravel or cobbles. Site soil conditions were noted at each of the hand boring locations, which were selected based on the location of proposed structures, as shown on the Site Plan provided by the project arcl-�itect. The approximate locations of our hand borings are shown on Figure 2, the Site & Exploration Plan Map. 665 Edmonds Way Development. 2 HWA GeoSciences Inc. T- 01 July 18, 2007 HWA Project No. 2007-105-21 Hand boring logs were prepared from our observations, and are presented on the attached Figures 4 through 8. A legend of the terms and symbols used on the exploration logs precedes them as Figure 3. The hand auger borings at all locations were supplemented by utilizing a Dropweight Cone Penetrometer (DCP) to check relative soil density/strength conditions. The DCP consists of a steel extension shaft assembly, with a 60 degree hardened steel cone tip attached to one end, which is driven into the subsoil by means of a sliding drop harruner. The base diameter of the cone is 20 mm. The diameter of the shaft is 8 nun less than that of the cone to ensure that at shallow penetration depths the resistance to penetration is exerted on the cone alone. The DCP is driven by repeatedly dropping an 8 kg sliding hammer from a height of 57S mm. The depth of cone penetration was measured after each hammer drop and the soil shear strength is reported in terms of the DCP index. The DCP index is based on the average penetration depth resulting from I blow of the 8 kg hammer and is reported as millimeters per blow (min/blow). The data obtained from the DCP tests was correlated to approximate Standard Penetration Testing (SPT) blows per foot, in order to evaluate the density/strength of the subgrade soils. The DCP data is plotted on the appropriate Hand Boring/DCP Logs on Figures 4 through 9. LABORAToRy TESTING Laboratory tests were conducted on selected samples obtained from the hand boring explorations to characterize relevant engineering and index propel ties of the site soils. Laboratory tests included determination of in -situ moisture content and particle size characteristics. The tests were conducted in general accordance with appropriate American Society of Testing and Materials (ASTM) standards. The moisture content test results are displayed on the exploration logs and on the particle size distribution graphs provided on Figure 10, as appropriate. SOIL PROFILE Typically, the near surface soils observed in the hand borings consisted of loose to mediurn dense fill soils overlying weathered and unweathered glacial outwash soils. The soil conditions are described briefly as follows: Undocumented Fill. -Immediately below grade in all hand borings except HH-4, undocumented fill was encountered, and consisted of loose to medium dense, brown to yellow brown, fine sandy silt, silty fine sand to sand with silt and gavel; often containing wood debris. This soil unit was fully penetrated in HH-3 and HH-4 where it was 4.4 and 3.4 feet thick, respectively. Apparently, the fill thickens to the south and from east to west on site. Weathered Out -wash: - Weathered outwash, consisting of loose, brown to yellowish brown, silty sand with to sand with silt and gravel, was encountered below the fill in all 665 Edmonds Way Development. � 3 HWA GeoSciences Inc. 1-3 July 18, 2007 HWA Project No. 2007-105-21 the hand borings at depths ranging from 0.2 to 2.9 feet below the existing ground surface. The thickness of this unit, where penetrated in HH-2, HH-3, and HH-5, ranged from 0.9 to 2 feet. Below this unit, the soil becomes cleaner, denser, and changes color to olive brown or gray. Advance Outwash — Advancebutwash, consisting of medium to dense, olive brown to gray, sand with silt and gravel, was encountered below the weathered outwash at an approximate depth of 2.8 feet in HH-2; at 3.8 feet in HH-3; and 3.0 feet in HH-5. The thickness of this unit is unknown as it was too deep to fully penetrate with hand tools. It appears, however, that the depth to advance outwash increases slightly from west to east. DCP soundings indicate that these soils become denser at about 4 to 5 feet below existing grade at the test locations. GROUND WATER Ground water seepage was not observed in any of the hand borings. However, it is anticipated that ground water conditions will vary depending on the season, variations in local subsurface conditions, and other factors. During wet season periods, it is possible that ground water may become perched on the surface of lower permeability deposits that may exist at other locations of this site. GEOLOGIC HAZARDS In accordance with the criteria contained in the City of Edmonds Code, Title 23-Natural Resources; Chapter 23.80 - Geologically Hazardous Areas, the subject site is not situated witliin an area designated as a potential erosion or landslide/steep slope or seismic hazard. The existing native soils consist of granular soils that were directly glacially consolidated, and are dense. There are no steep slopes on the property and, consequently, no potential landslide hazard. CONCLUSIONS AND RECOMMENDATIONS General In surnmary, the soil conditions within the subject site proposed for the commercial development consists of mediurn dense, granular, glacial outwash soils, overlain by loose to medium dense undocumented fill and weathered outwash layers at least 4-5 feet thick. The actual depth to medium dense native soils at other locations within the development footprint will need to be verified in the field during construction. In our opinion, the medium dense to dense native sand (outwash) will provide adequate bearing for the foundation system for the proposed single -story structure. However, the undocumented fill and weathered outwash materials are not recommended for foundation and floor slab support purposes. 665 Edmonds Way Development. 4 HWA GeoSciences hie. July 18, 2007 HWA Project No. 2007-105-21 Excavation and Temporary Shoring Requirements Preparation for construction of conventional foundations will require the excavation and removal of all undocumented fill beneath proposed footing and slab areas. Based on the results of our investigation, these excavations will be at least 4 feet deep or cireater and require excavation wall sloping and/or shoring to protect workers and existing structures in accordance with Part N of WAC (Washington Administrative Code) 296-155. The fill materials at the site classify as Type C soil. Unsupported excavations in Type C soils, exceeding 4 feet in depth, must be inclined no steeper than I Y2H: IV (horizontal to vertical). Flatter slopes may, however, be required if ground water seepage occurs. Temporary excavation slopes should be protected from erosion, as necessary, by covering the cut face with well -anchored plastic sheets. Maintenance of safe working conditions, including temporary excavation stability, is the responsibility of the contractor. Based on the soil conditions observed in our explorations, we anticipate that the on -site soils can be excavated with conventional equipment such as backhoes and loaders. Foundations and Floor Slabs Design Considerations: The proposed structure may be supported on footings bearing directly on medium dense native soils; or on properly compacted structural fill, which may, subject to the prior approval of the geotechnical engineer, consist of the existing on site undocumented fill soils that are removed and replaced under controlled compaction. The recommended compaction level for structural fill placed under footings and grade - supported slab levels is 95% Modified Proctor maximum dry density (per ASTM D1557). in our opinion, wall or column footings bearing in medium dense to dense advance outwash may bedesigned for 2,500 pounds per square foot (pso maximum allowable bearing pressure. Footings bearing within structural fill placed over the dense to very dense glacial till may be designed for allowable bearing pressures up to 2,000 psf, These values may be increased by 1/3 for short-term loads such as wind and seismic effects. It is not, however, recommended that foundations be designed for differing bearing pressures, or be supported on dissimilar materials, to avoid potentially undesirable differential settlements. Continuous footings should have a minimum width of 18 inches, and column footings should have a minimum width of 24 inches, regardless of bearing pressure considerations. Minimum footing widths may, therefore, govern footing design. Footings should bear at least 24 inches below the lowest adjacent exterior grade to provide for ft-ost protection. If footings are supported by structural fill, this fill should extend beyond the outer edges of the footings a ininimum. distance equal to the fill thickness existing below the footing, measured at the level of the excavation base. If adjacent individual footings are located at different elevations, it is reconu-nended that the horizontal distance between them be at least 1.5 times the elevation difference between their 665 Edmonds Way Development. HWA GeoSciences Inc. July 18, 2007 -105-21 HWA Project No. 2007 bases. Where adjoining continuous footings are at different elevations, the upper footing should be progressively stepped down to the lower footing. Typically, each step height should be limited to 2 feet or less and the following footing run should be at least twice the step height. We recommend that perimeter foundation drains be provided around all exterior footings. The footing drains and all surface drains should be separately tight -lined to discharge to a sewer or storm basin. Surface and roof drains should not be inter -connected with the foundation drains to prevent the potential clogging and flooding of these drains. Floor slabs may be supported at grade on structural fill compacted to the requirements indicated above. If grade -supported slabs are employed, they must be underlain by a capillary break layer comprised of clean uniform, open -graded, washed rock or pea gravel, to prevent future slab dampness which could be detrimental to floor coverings and functional use of the facility. This capillary break layer should be at least 6 inches thick and should be in contact with, or provided with suitable drainage outlets, to the perin eter foundation drain system. A plastic vapor barrier should be placed on top of the capillary break layer to isolate the slab concrete from this layer, and should consist of plastic sheathing such as Visqueen. Construction Considerations: Footing foundation excavations should be trimmed neat and the excavation bottoms should be carefully prepared in order to minimize the amount of soil disturbance and need of over -excavation that may otherwise be required. The ground surface, where structural fill, foundations, or slabs are to be placed, should be proof -rolled, or suitably probed to determine the presence and approximate extent of any soft or unstable areas. Proof -rolling or probing should be performed under full-time observation of an HWA representative. Any soils that cannot be adequately recornpacted should be over -excavated and the unsuitable materials removed and replaced with compacted structural fill to a depth that will provide a stable base. We recommend that HWA be retained to observe and approve footing excavation preparation, and placement and compaction of structural fill prior to pouring concrete. Asstu-ning construction is performed as recornmended herein, we estimate that the total and differential settlements for foundations will be less than I -inch and 1/2 -inch, respectively. Seismic Considerations Should it be necessary for a development of this type to be designed for seismic cond * itions, we anticipate that the new structures would be designed in accordance with the 2003 International Building Code (IBC) standards. In this regard, for seismic design purposes, the site is considered Site Class C, as described in Section 1615.1 of the 2003 IBC. For the site location, the design maximum considered spectral response 665 Edmonds Way Development. 6 HWA GeoSciences Inc. I -(.e July 18, 2007 HWA Project No. 2007-105-21 acceleration at short periods, Ss, is 1.26g. The design maximum considered spectral response acceleration at 1 second period, S1, is 0.43g. Soil liquefaction is a phenomenon wherein loose, saturated, granular deposits temporarily lose strength and behave as a liquid in response to earthquake shaking. Based on our observation of relatively dense material at or close to the base of the hand borings and the apparent absence of regional ground water at shallow depths, we consider the potential for seismic liquefaction on the site to be negligible. Hence, seismically induced liquefaction instability is Dot considered to be an issue for this site. Erosion Control during Construction Best Management Practices (BMP's) as described in City of Edmonds Code must be followed for erosion control during construction. These measures include ail erosion control plan that addresses, lin-dting activity during wet periods, placement of a silt retention system on the eastern side of the property, and proper disposal or recompaction of any material that is disturbed on the site. CONDITIONS AND LIMITATIONS We have prepared this letter report for Mr. Scott Anderson, for use in design, pennitting, and construction of the proposed 4,800 square foot building on the subject lot. Experience has shown that soil and ground water conditions can vaiy significantly over small distances. Inconsistent conditions can occur between explorations and may not be detected by a geotechnical study of this scope. Accordingly, HWA should be consulted for review and potential revision of our recommendations, if conditions are encountered during construction that differ materially from those encountered during our investigation and described in this report. Our scope of work did not include environmental assessments or evaluations regarding the presence or absence of wetlands or hazardous substances in the soil, surface water, or ground water at this site. HWA does not practice or consult in the field of safety engineering. We do not direct the contractor's operations and we cannot be responsible for the safety of personnel other than our own on the site; the safety of others is the responsibility of the contractor. The contractor should notify the owner if any of the recominended. actions presented herein are considered unsafe. 0-0 665 Edmonds Way Development. 7 HWA GeoSciences Inc. 1`7 July 18, 2007 HWA Project No. 2007-105-21 We appreciate the opportunity to be of service, and trust that this report meets with your requirements. However, if you have any questions regarding this report, or require further assistance, please do not hesitate to contact either of the undersigned at (425) 774- 0106. Sincerely, HWA GEOSCIENCES INC. 1EXPIRES 081241,92=5 Steven E. Greene, L.E.G. Lome A. Balanko, P.E. Vice President/Senior Engineering Geologist President Attachments: Figure 1: Project Site Location and Vicinity Map Figure 2: Site Plan & Exploration Plan Figure 3: Legend of Symbols and Ten -as Figure 4: Log of HH-1 & DCP- I Figure 5: Log of HH-2 & DCP-2 Figure 6: Log of HH-3 & DCP-3 Figure 7: Log of HH-4 & DCP-4 Figure 8: Log of HH-5 & DCP-5 Figure 9: Log of DCP 1 -13 Figure 10: Particle Size Analyses 665 Edmonds Way Development. 8 HWA GeoSciences Inc. 11-13 I July 18, 2007 HWA Project No. 2007-105-21 REFERENCES Booth, D.B, Cox, B.F., Troost, K.G., a S. A. Shimel, 2004, Con7posite Geologic Allap of the Sno-King Area, Unillersity of Washington, Seattle Area Geologic Mapping Project. - City of Edmonds, 2000, Title 23-ATatural Resources; Chapter 23.80 — Geologically Hazardous Areas. International Code Council (ICC), 2003 International Building Code. NRCS, 1983, Soils Adap ofSnohomish Couno) Area, WA661 (on-line version) WSDOT, 2006, Standard Specificationsfor Road, Bridge, and Municipal Construction, M 41-10. 665 Edmonds Way Development. 9 i HWA GeoSciences Inc. TOPOI map printed on 07/09/07 from "WasNngton.tpo" and "Untided.tpg" Ry L Edri n 9 imond's X N fri r-1 ? o Approximate co Project Site Location :3 :r z 1 7VT o �wnt welig 0: Nk ""T Iv. .—Y t 04 X X CA TNjr /MY via* u A HWAGEOSCIENCES INC. a------------------- I — 000 FEET I =METERS Piuded flz� TOP0.1 03MI Nd6usl Oe*Mbk HoktW (�.iopo.wW PROJECT SITE & VICINITY MAP GEOTECHNICAL INVESTIGATION COMMERCIAL DEVELOPMENT � 665 EDMONDS WAY C C P', min ---g "41 s M FE FIGURE NO. - I PROJECT NO. 2007-105 T-10 LEGEND H T HAND HOLE DESIGNATIOM AND APPROXIKATE LOCAMON DCP-6 + DCP DESIGNATION AND APPROMATE LOCAMON DCP-3 &HH-3 !.�F_DCP-4 HH- LL- — — — — — — — — — — — — — — — — - 14 LgIny S WIT 1; Nikw �',I�s ITS FS 226TH STREET S.W. N onnr a 20' 40, 80' SCALE: l'-40' HH-1 90,111 HWAGEOSCUNM INC 2 2007-105-21 DRILLING COMPANY: HWA GeoSclences Inc. SURFACE ELEVATION: :l: feet DATE STARTED: 07/03/2007 DRILLING METHOD: Hand Auger DATE COMPLETED: 07/0312007 SAMPLING METHOD: Grab LOGGED BY: T. Taddese & D. Coltrane LOCATION: See Figure 2 co ui a- Co 2 < Z� 1.- 4) U) 1— Non -Standard Penetration Resistance D z cn (0 a) 0 V5 Fi 17.6 lb weight 32.6" drop —4) 0 W 1 UJ -) Lu co M 'a of z 3: co U) 2 L) CL 2 (L 2 2� g w Z) 0 0- LU >_ (A) < < uJ of Lu DESCRIPTION a- z 0 0 0 0— ML I Soft, brown, fine to medium sandy SILT, roots and rootlets, dry to moist. Scattered fine gravel. (FILLIWEATHERED OUTWASH) SM Loose yellow brown. silty, fine to coarse gravelly, fine to coarse SAND, dry. S-1 Mc (WEATHERED OUTWASH) 2 Hand boring terminated at about 1.5 feet below existing ground surface due to refusal on gravel/cobble. No ground 3— water seepage was observed while advancing this hand boring. Dropiveight Cone Penetration Test (DCP-IA) was advanced adjacent to the hand boring to a depth of 5.2 feet below the existing ground surface. 4 5 6 7-1 , 8 9 1 10 NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. A, A; —2 A A A: A. 3 A, A, A� —4 . . .... .... —5 —6 —7 —9 0 2D 40 60 80 100 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-1 HWAGEOSCIENCES INC. 665 EDMONDS WAY PAGE: I of I EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 4 HANDHOL 2007-105.GPJ 7117/07 GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-2 III EDMONDS I PAGE: 1 of 1 HWAGEOSCIENCESINC EDMONDS,WASH . INGTON PROJECTNO.: 2007-105-21' FIGURE: 5 HANDHOL 2007-105.GPJ 7117/07 DRILLING COMPANY: HWA GeoSciences Inc. SURFACE ELEVATION: feet DATE STARTED: 07/03/2007 DRILLING METHOD: Hand Auger DATE COMPLETED: 07/03/2007 SAMPLING METHOD: Grab LOGGED BY: T. Taddese & D. Coltrane LOCATION See Figure 2 U) Lu Co W 0 z W Lu W CL < I.- a) Non -Standard Penetration Resistance z 0 U) W 17.6 lb weight 32.6" drop _J uJ III 0 U) _J _J ca U) a. CL uJ Lu z n (L W W 0 IX (L W 0 DESCRIPTION to in a. 0 0 0 0— ML Soft, - dark brown, fine to coarse sandy SILT, with brown fine to 0 ..a,.e ... bed volcanic gravel, rootlets, dry to moist. -�M — --- — — — — — — — — — LFILLL . . . . . . . . . . Loose, brown. silty, fine to coarse gravelly, fine to medium SAND, dry, rootlets. a S-1 MC 2— —2 Utility top at 2.1 feet below existing ground surface. -- ------------------- A 3—Loose, rust mottled, yellow brown, slightly silty, fine to coarse S-2 MC 3 gravelly, fine to coarse SAND, moist. GS (WEATHERED OUTWASH) . . . . A, >>A 6 A :--w- Loose, olive brown, fine to coarse gravelly, fine to medium S-3 MC A� —4 AND, moist. (OUTWASH) A Hand boring terminated at about 4.0 feet below existing ground surface due to caving on loose materials. No ground 5— water seepage was observed while advancing this hand .... q —5 boring. a Dropweight Cone Penetration Test (DCP-3) was advanced A adjacent to the hand boring to a depth of 7.0 feet below the existing ground surface. A 6— —6 A 7- 111-7 8— -9 101 20 40 60 80 10 100 0 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-3 HWAGEOSCIENCU fNC 665 EDMONDS WAY PAGE: 11 of I EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 6 HANDHOL 2007-105.GPJ 7117107 T-lq GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT HH-4 HWAGEOSCIENCES INC. ED"' EDMONDS WAY PAGE: I of I MONDS, WASHINGTON PROJECT No.: 2007-105-21 FIGURE: 7 HANDHOL 2007-105.GPJ 7/17107 X-15 0'_DRILLINGCOMPANY: HWAGeoScjences Inc. SURFACE ELEVATION: DRILLING METHOD: Hand Auger SAMPLING METHOD: Grab LOCATION: See Figure 2 i feet DATE STARTED: 07/03/2007 DATE COMPLETED: 07/03/2007 LOGGED BY: T. Taddese & 0. Coltrane to U) uj W Q a: w M z -t — , 2 0 l- I-_ Non -Standard Penetration Resistance 0 z U) rn co Lu I_ 0 17.6 lb weight 32.6" drop 0 U) uj W _j _j W W W z Z) a. M U) 2 0 CL CL 2 2 2� WX 10-- 0 ao: Q. Li W 0 (n =) DESCRIPTION ouj Z_ 0 0— 0 SM Loose, brown, SAND with slit and , roots and rootlets, wood debris. dry to moist. (FILL) SM Loose, light yellow brown, silty SAND with gravel, rootlets, dry to moist S-1 me (FILLfWEATHERED OUTWASH) a 2- 2 Increase in fine gravel and coarse send content noted. 3 —3 SP Medium dense, olive brown, fine to medium SAND. Scattered S-2 MC coarse sand and fine gravel, moist. GS (ADVANCE OUTWASH)' Sand becoming light yellow brown at 3 5 feet below exisflng ground surface- :>> 4 4— a Hand boring terminated at about 4A feet below existing 5— ground surface due to refusal on gravel/cobble. No ground .... —5 water seepage was observed while advancing this hand boring. Dropweight Cone Penetration Test (DCP-5) was advanced from the bottom of hand boring to a depth of about 5.2 feet 6— below the existing ground surface. a 6 7— —7 8- 10— —10 0 20 40 60 80 100 Water Content (%) Plastic Limit 1 0 Liquid Limit Natural Water Content NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated and therefore may not necessarily be indicative of other times and/or locations. GEOTECHNICAL INVESTIGATION HAND HOLE: ffLT, COMMERCIAL DEVELOPMENT HH-5 HWAGEOSCIENCES INC 665 EDMONDS WAY PAGE: 1 of 1 EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 8 HANDHOL 2007-105.GPJ 7117107 GEOTECHNICAL INVESTIGATION HAND HOLE: COMMERCIAL DEVELOPMENT DCP I-B III EDMONDS WAY PAGE: I of 1 HWAGEOSCIENCES 'NC EDMONDS, WASHINGTON PROJECTNO.: 2007-105-21 FIGURE: 9 HANDHOL 2007-105.GPJ 7117107 1-17 GRAVEL SAND Fine Coarse Medium Fine__] Coarse SILT CLAY ME Milli I IRIS liiimmlii 1 111161111111104 11111 1111 INS I liiiinmiiii liiism�illirikinkNi Millillismi liiism� 11 liplill SHE 1111 Ills! 11 Ili III i loin Milli lu' 111 111 111111 si IRIS Ills IS 1111 milli Ills IBM 11! 111 01111 Milli off SYMBOL SAMPLE DEPTH (ft) CLASSIFICATION OF SOIL- ASTM D2487 Group Symbol and Name %MC LL* PL PI Gravel % Sand % Fines 0 * HH-2 S-2 1.8-2.0 (SP) Light yellowish brown, poorly graded SAND 3 17.1 81.1 1.8 * HH-3 S-2 3.0-3.5 (SP) Reddish brown, gravelly, poorly graded SAND 5 35.7 59.4 4.9 A I HH-5 S-2 3.0 - 3.5 1 (SP) Light yellowish brown, poorly graded SAND 1 4 1 1 1 1 11.3 1 84.9 1 3.8 =A GEOTECH ICAL INVESTIGATION PARTICLE -SIZE ANALYSIS COMMERCIAL DEVELOPMENT OF SOILS 00 HWAGEOSCIENCES INC 665 EDMONDS WAY METHOD ASTM D422 EDMONDS, WASHINGTON PROJECT NO.: 2007-105-21 FIGURE: 10 HWA GEOSCIENCES INC, March 3, 2010 HWA Project No. 2007-105-21. Andet-son Development -23632 Highway 99, Suitc.F, PMB 502 Edinonds, WA 98206 Attn: Mr. Scott Anderson Re: DESIGN INFILTRATION RATE ESTIMATE Grow With Us 665 Edmonds Way Edmonds, Washington Dear Mr. Anderson: This letter provides an estimated long term (design) infiltration rate for the proposed on site storm water disposal system required for the "Grow with Us" Day Care Facility planned for construction at 665 Edmonds Way, Edmonds� Washington. The project site location is within the Area "where infiltration may be feasible" according to Exhibit B prepared by the City of Edmonds� as shown. on Figure 1. This estimate is based oil the evaluation of previously developed. laboratory grain size data for a sample obtained in hand boring, HH-5 as part of a geotechnical investigation conducted in 2007 by HWA GeoSciences hic (Geotechnical Investigationfor Commercial Development, 605 Eidnionds Edmonds, Washington for Anderson Development). As currently proposed, we understand that a storm -water infiltration trench is proposed to be situated as shown on Figure 2. Review of the log of the existing hand. boring log for HH-5. which is located at the Northwest.end Of the proposed trench, indicates this portion. of the site underlain below a, depth of 3 feet by advance outwash sand deposits comprised of poorly graded sand with gravel (See,Figure 3). Normalization of the grain size data obtained for sample S-2 froin HH-5 indicates the soil can be c lassified as Sand in accordance with USDA classification systern. as shown on. Figure 4. According to the Washington State Department of Ecolo * gy's Storm Water Management Manual for Western Washington, infiltration rates can be estimated from grain size distribution data. Using Table 3.7 entitled "Recornmended. Infiltration rates based on the USDA Soil Textural Classification" an estimated long terin (design) infiltration rate of 2.0 inches per hour is estimated lot this project site area. CONDITIONS AND LIMITATIONS We have prepared this infiltration system evaluation and sizing for the client Mr. Scott Anderson, for use in designing and permitting the proposed commercial development. Experience has shown that soil and ground water March 3, 2010 HWA Project No. 2007-105-21 conditions can vary signi ficantly over si-hall distances. Inconsistent conditions can occur between explorations and may not be detected by a geotechnical assessment of this limited scope and nature. Accordingly, we make no warranty expressed or implied that subsurface conditions throughout this site will be as observed at our exploration locations. Should conditions be found to vary signit7fcantly from what we have described during future construction operations on site ' we should be notified immediately so that wc may review Such findings and the applicability of our recommendations to the development being proposed. If you have any questions regarding this proposal, or need additional information, please do not hesitate to contact us. Sincerely, .HWA GeoSciences Inc. 0 1704 W Aju'111_114V "'EVEN ELLIOTT GREENE Steven E. Greene, L.E-.G. Engineering Gcologist[Vice President Attachments: Figure I Infiltration Feasibility Map Figure 2 Project Site E;xploration Plat! Figure 3 1-,og of Hand boring HB-5 Figure 4 USDA Classification Chart Cirow With Us -Infiltration Rate 2 HWA,GeoSciences Inc. -T. :Z0 EXHIBIT B City of Edmonds Infiltration Feasibility Map < th Scole: 1"=4000' 16 11 lvxtd LEGEND A soli"VT Colin Y PARK YMBOL MEANING Vie 01 Siles where 617(trotion may be msibl.. if conditions are met. sit.$ where Will'.60. h N will -at be Permitted. CITY Lfmlrs M.;. S Y�f 'k V, roxi telate A ion S. 220th 1. 2241h c 228(h st- x E INGE 2 ULT", I HWAGEOSCIENCES INC. INFILTRATION FEASIBILITY'MAP FIGURE NO. DESIGN INFILTRATION RATE ESTIMATE PROJECT NO. GROW WITH US 665 EDMONDS WAY 2007-105 EDMONDS, WASHINGTON 'tmmml a t;m) L% t i s n.ova-,mr r&hrV(�(UFir.Tr-.5 fA.,,va7*v QX4:M0 fl'i.' T TJMl*&A L C.- 'Y44-1, LIX-ArK14 5. 2, 9p ;oc.*, kyst—I'A kmn. DIV sAjarl IvK�!LL, A."I t-1 I-P-1 pi I— ;1e5,m dw K, -*wT brry, Ctp ft- r.%-&.-r ahm... 4�7 Le: -A* La —ad GS WE CqTmxy"l 0 (41 Irl t it- rJEOtEGHtfir-AL INVESTIGAtION HAND HOLE: CCARAERCK. DEVGLOPMENT HH-5 imaosawas mr- 665 ECIPACINDE, WAY I"Irle 1 C4 1 EDMONDS. 10,1ASHINGTON 2037-106-21 a i7030A: ?xr.!)4 1ILTI, I HWAGEOSCIENCES INC. DESIGN INFILTRATION RATE ESTIMATE GROW WITH US 665 EDMONDS WAY EDMONDS. WASHINGTON j 5 i FIGURE NO. 1'-23 I MQ ONO Borehole Depth (ft) USDA Classification Sand (%) Silt (%) Clay (%) 0 HH-5-S2 3.0 SAND 95.5 3.5 1.0 Fractions normalized to 100% passing the 2mm (#10) sieve UVA DESIGN INFILTRATION RATE ESTIMATE GROW WITH US USDA Textural HMGEOSCIENCESINC 665 EDMONDS WAY Classification Chart EDMONDS, WASHINGTON PROJECTNO.: 2007-105-21 FIGURE: 4 USDA TEXTURAL CLASSIFICATION 2007-iO5.GPJ 30`10 X-021 STREETFILE RESUB JUN 112010 "N 0 NMC r Operation and Maintenance Guidelines ;em FOR Grow With Us Learning Center 665 Edmonds Way Edmonds, Washin gton June 2 nd 2010 Of WA ST Prepared by: Robert L. Long MEMO LM N N Lovell-Sauerland & Associates 1921736 th Avenue W. Suite 106 Lynnwood, Washington 98036 LSA No. 5221 Operation and Maintenance Guidelines FOR Grow With Us Learning Center 665 Edmonds Way Edmonds, Washington June 2 nd 2010 ITA S, 3esda A Prepared by: Robert L. Long Lovell-Sauerland & Associates 1921736 th Avenue W. Suite 106 Lynnwood, Washington 98036 LSA No.5221 Grow With Us Learning Center 665 Edmonds Way Introduction: This Operation and Maintenance Guidelines manual provides a summary of the site redevelopment and outlines the function and proeceudres for operation and maintenance of the storm drainage control systems for the project. The property is located at 665 Edmonds Way in the southwest 1/4 of Section 25, T 27 N, R 3 E, W.M. Applicant/Owner Grow With Us Learning Center c/o Scott Andersen 21318 84" Ave IN Edmonds, WA 98026 (425) 772-2975 Project Summary. Site Address: 665 Edmonds Way Edmonds, WA 98020 Tax Parcel Number. 270325-003-080-00 The total site consists of about 12,824 sf (0.2944 acres) and occupied by a single family residence (June 2010). The proposed project includes conversion of the existing residential structure to a daycare facility by adding about 850 sf floor area and reconstructing the driveway and parking area. The reconstructed driveway would add parking stalls, a trash enclosure area, and restrict the loop driveway to one-way traffic flow with an entrance (southeast access point) and exit (northwest access point). Frontage improvements along Edmonds Way already exist and only new driveway cuts and ramps will be reconstructed. Nearly all existing vegetation will be removed during grading activities in the development area of the site; some existing vegetation may be retained along the site's property lines. Landscaping and grass lawn around the new house will stabilize the site upon building construction. Infrastructure improvements include reconstructed driveway and access points; storm water collection, conveyance and infiltration trench to control stormwater runoff; and possible reconnection of the typical utilities- water, sewer, gas, electric, and communication services as needed. A storm drainage collection and infiltration trench will be installed just west of the existing building. All roof top drains and runoff flows from the driveway area shall be routed to the proposed infiltration trench. Lovell-Saueriand and Associates Engineering and Drainage Report LSA No.5221 L= Grow With Us Learning Center 665 Edmonds Way June 2010 D�n. I ^f I I Stormwater Control System Summary. The project proposes to create, replace and/or retain 8,450 sf of impervious surface on -site. To mitigate the re -development of the site, an infiltration system will be installed to control the drainage runoff. All of the on -site impervious surfaces shall be collected and routed to an on -site infiltration system. The proposed 89 ft (1) x 6 ft (w) x 3.0 ft (d) infiltration trench has been designed to completely disperse the 1 00-year 24-hour design storm on -site. Therefore, the project will have no "effective impervious" surface that impacts the City's drainage system. The on -site infiltration trench is to be constructed per the City of Edmonds' standard practices. The length of the trench is dependent upon the designed infiltration rate of the native soils and the collection area conveyed to the trench. SCS soil survey designates the area soils as an Everett (#17- type A) soil. In accordance with a soil evaluation a design infiltration rate of 2 in/hr has been used to size the on -site infiltration trench. The site specific geotechnical evaluations and compete engineering calculations for the system are on file at the City of Edmonds. Site Area Summary. Total Site Area = 12,824 sf Proposed Impervious = 8,450 sf Building Addition, Patio and Walk 1,509 sf Existing House = 1,441 sf Driveway / Parking = 5,500 sf Proposed Pervious = 4,574 sf (Lawn and landscape) Inflitration Trench Design Summary Table: Total Site Area Proposed Impervious Area Proposed Pervious Area Developed Storm Events (SCS Unit Hydrograph) Peak Storm Runoff Rates Total Storm Volumes Infiltration Trench Design (89'x 6'x X) Provided Storage Volume (30% voids) Infiltration Rate (2 in/hr over 89' x 6' bottom area) 12,824 sf (0.294 acres) 8,250 sf (0.189 acres) 4,574 sf (0. 105 acres) 2 year 10 vear 100 year 0.06 cfs 0.08 cfs 0. 13 cfs 894 cf 1,279 cf 2,109 cf 480 cf 0.0247 cfs Lovell-Sauerland and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 P:400 I nf 11 Operation and Maintenance Requirements: This manual is intended to provide guidance to the owner(s) for the operation and maintenance of the drainage and the stormwater detention storage facilities for the Grow With Us Learning Center (665 Edmonds Way). The owner is responsible for maintenance of storm drainage facilities within the property. The owner is not responsible for maintenance within the public right-of-way. This manual is not comprehensive. Although it explains the intended operation of the various components of the drainage system, and suggests a routine of inspection and maintenance, it cannot anticipate every problem. Once a historical record of maintenance is established, it may be prudent to alter the routine. It is recommended that maintenance records be kept, and that the records be reviewed periodically. Concept of Operation: The drainage design is shown and described in the final site development engineering plans and report. The approved site development plans and report should be retained as part of this document and used as a reference to identify drainage facilities mentioned in this manual. Stormwater Infiltration Trench System. The onsite infiltration trench system consists of an underground rock filled trench with a 6" perforated dispersion pipe running through the center. The infiltration trench is located under the proposed driveway and parking area between Edmonds Way and the onsite building. The infiltration trench system has been designed to completely infiltrate the 100-year 24-hour storm event. If an extraordinary event was to occur or multiple back to back large storm events occurred the catch -basins at the ends of the trench would overtop and overflow into the street system. If regular overtopping of the collection catchbasin is experienced the system shall be thoroughly cleaned and inspected. Over a period of time siltation of the infiltration bed can occur (especially if the system is not inspected and cleaned regularly) and replacement of the rock in the infiltration system may be required. Recommended Inspections of Facilities. The following are inspection guidelines for the drainage system. A minimum of two overall site drainage system inspections should occur annually. The inspections should occur prior to the winter rain season (September/October), leaving sufficient time to correct any detected maintenance problems, and at the end of the season (May/June) to determine the effect of the season's runoff. A mid raining season (February) inspection is recommended. Once a historical basis is developed the frequency of inspection may be modified as necessary. For additional and updated maintenance information visit the Washington State Department of Ecology's web -site at: http://www.ecy.wa.gov/programs/Wq/Wqhome.htmI Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 P;4aa :t nf 11 General Design, Maintenance, and Construction Criteria for Infiltration Facilities Construction Criteria . Initial basin excavation should be conducted to within 1 -foot of the final elevation of the basin floor. Excavate infiltration trenches and basins to final grade only after all disturbed areas in the upgradient project drainage area have been permanently stabilized. The final phase of excavation should remove all accumulation of silt in the infiltration facility before putting it in service. After construction is completed, prevent sediment from entering the infiltration facility by first conveying the runoff water through an appropriate pretreatment system such as a pre -settling basin, wet pond, or sand filter. . Infiltration facilities should generally not be used as temporary sediment traps during construction. If an infiltration facility is to be used as a sediment trap, it must not be excavated to final grade until after the upgradient drainage area has been stabilized. Any accumulation of silt in the basin must be removed before putting it in service. . Traffic Control — Relatively light -tracked equipment is recommended for this operation to avoid compaction of the basin floor. The use of draglines and trackhoes should be considered for constructing infiltration basins. The infiltration area should be flagged or marked to keep heavy equipment away. . Trench Preparation -Excavated materials must be placed away from the trench sides to enhance trench wall stability. Care should also be taken to keep this material away from slopes, neighboring property, sidewalks and streets. It is recommended that this material be covered with plastic. Stone Aggregate Placement and Compaction - The stone aggregate should be placed in lifts and compacted using plate compactors. As a rule of thumb, a maximum loose lift thickness of 12 inches is recommended. The compaction process ensures geotextile conformity to the excavation sides, thereby reducing potential piping and geotextile clogging, and settlement problems. . Potential Contamination - Prevent natural or fill soils from intermixing with the stone aggregate. All contaminated stone aggregate must be removed and replaced with uncontaminated stone aggregate. . Overlapping and Covering-Fol lowing the stone aggregate placement, the geotextile must be folded over the stone aggregate to form a 12 inch minimum longitudinal overlap. When overlaps are required between rolls, the upstream roll should overlap a minimum of 2 feet over the downstream roll in order to provide a shingled effect. - Voids behind Geotextile - Voids between the geotextile and excavation sides must be avoided. Removing boulders or other obstacles from the trench walls is one source of such voids. Natural soils should be placed in these voids at the most convenient time during construction to ensure geotextile conformity to the excavation sides. Soil piping, geotextile clogging, and possible surface subsidence will be avoided by this remedial process. - Unstable Excavation Sites - Vertically excavated walls may be difficult to maintain in areas where the soil moisture is high or where soft or cohesionless soils predominate. Trapezoidal, rather than rectangular, cross -sections may be needed. Lovell-Saueriand and Associates Grow With Us Learning Center Engineeting and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 P:nrin A nf 11 Maintenance Criteria Provision should be made for regular and perpetual maintenance of the infiltration basin/trench, including replacement and/or reconstruction of the any media that are relied upon for treatment purposes. Maintenance should be conducted when water remains in the basin or trench for more than 24 hours after the end of a rainfall event, or when overflows occur more frequently than planned. For example, off-line infiltration facilities should not have any overflows. Infiltration facilities designed to completely infiltrate all flows to meet flow control standards should not overflow. An Operation and Maintenance Plan, approved by the local jurisdiction, should ensure maintaining the desired infiltration rate. Adequate access for operation and maintenance must be included in the design of infiltration basins and trenches. Removal of accumulated debris/sediment in the basin/trench should be conducted every 6 months or as needed to prevent clogging, or when water remains in the pond for greater than 24 hours after the end of a rainfall event. Volume /// — Hydrologic Analysis and Flow Control BMPs February 2005 Lovell-Saueriand and Associates Grow With Us Learning Center Engineering and Drainage Report 665 Edmonds Way LSA No.5221 March 2010 P;Igp 1; of 11 4.6 � Maintenance Standards for Drainage Facilities The facility -specific maintenance standards contained in this section are intended to be conditions for determining if maintenance actions are required as identified through inspection. They are not intended to be measures of the facility's required condition at all times between inspections. In other words, exceedence of these conditions at any time between inspections and/or maintenance does not automatically constitute a violation of these standards. However, based upon inspection observations, the inspection and maintenance schedules shall be adjusted to minimize the length of time that a facility is in a condition that requires a maintenance action. Table 4.5 — Maintenance Standards No. I — Detention Ponds Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed.. General Trash & Debris Any trash and debris which exceed 5 Trash and debris cleared from site. cubic feet per 1,000 square feet (this is about equal to the amount of trash it would take to fill up one standard size garbage can). In general, there should be no visual evidence of dumping. If less than threshold all trash and debris will be removed as part of next scheduled maintenance. Poisonous Vegetation and Any poisonous or nuisance vegetation which may constitute a No danger of poisonous vegetation where maintenance personnel or the noxious weeds hazard to maintenance personnel or public might normally be. (Coordinate the public. with local health department) Any evidence of noxious weeds as Complete eradication of noxious weeds defined by State or local regulations. may not be possible. Compliance with (Apply requirements of adopted IPM policies for the use of herbicides). State or local eradication policies required Contaminants Any evidence of oil, gasoline, NO and Pollution contaminants or other pollutants 00fitaFftiftafitS (Coordinate removal/cleanup with O"011utants- ffeSeflt. local water quality response agency). Rodent Holes Any evidence of rodent holes if Rodents destroyed and dam or berm facility is acting as a dam or berm, or repaired. (Coordinate with local health any evidence of water piping through department; coordinate with Ecology dam or berm via rodent holes. Dam Safety Office if pond exceeds 10 I acre-feet.) 4-30 Volume V — Runoff Treatment BMPs Februafy 2005 D­ C _f 11 No. I — Detention Ponds Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance IsPerformed Pond Berms Settlements Any part of berm which has settled 4 Dike is built back to the design (Dikes) inches lower than the design elevation. elevation. If settlement is apparent, measure berm to determine amount of settlement. Settling can be an indication of more severe problems With the berm or outlet works. A licensed civil engineer should be consulted to determine the source of the settlement. Piping Discemable water flow through pond Piping eliminated. Erosion potential berm. Ongoing erosion with potential resolved. for erosion to continue. (Recommend a Goethechnical engineer be called in to inspect and evaluate condition and recommend repair of condition. Emergency Tree Growth Tree growth on emergency spillways Trees should be removed. If root Overflow/ creates blockage problems and may system is small (base less than 4 Spillway and cause failure of the berm due to inches) the root system may be left in Berms over 4 uncontrolled overtopping. place. Otherwise the roots should be feet in height. removed and the berm restored. A Tree growth on berms over 4 feet in licensed civil engineer should be height may lead to piping through the consulted for proper berm/spillway berm which could lead to failure of restoration. the berm. Piping Discernable water flow through pond Piping eliminated. Erosion potential berm. Ongoing erosion with potential resolved. for erosion to continue. (Recommend a Goethechnical engineer be called in to inspect and evaluate condition and recommend repair of condition. Emergency Emergency Only one layer of rock exists above Rocks and pad depth are restored to Overflow/ Overflow/ native soil in area five square feet or design standards. Spillway Spillway larger, or any exposure of native soil at the top of out flow path of spillway. (Rip -rap on inside slopes need not be I I I replaced.) I II Erosion I See "Side Slopes of Pond" I 4-32 Volume V — Runoff Treatment BMPs February 2005 Dnna 7 -f 1 1 No. 2 — Infiltration -Maintenance, Defect.. Conditions When Maintenan e Is Results Eipe4fi;d�W6en. orn onen 'Needed Mainbanahce'16,� Peirformed General Trash & Debris See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Poisonous/Noxious See "Detention Ponds" (No. 1). See "Detention Ponds" Vegetation (No. 1). Contaminants and See "Detention Ponds" (No. 1). See "Detention Ponds" Pollution (No. 1). Rodent Holes See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1) Storage Area Sediment Water ponding in infiltration pond after Sediment is removed rainfall ceases and appropriate time and/or facility is cleaned allowed for infiltration. so that infiltration system works according to (A percolation test pit or test of facility design. indicates facility is only working at 90% of its designed capabilities. If two inches or more sediment is present, remove). Filter Bags (if Filled with Sediment and debris fill bag more than 1/2 Filter bag is replaced or applicable) Sediment and full. system is redesigned. Debris Rock Filters Sediment and By Visual inspection, little or no water flows Gravel in rock filter is Debris through filter during heavy rain storms. replaced. Side Slopes of Erosion See "Detention Ponds" (No. 1). See "Detention Ponds" Pond (No. 1). Emergency Tree Growth See "Detention Ponds" (No. 1). See "Detention Ponds" Overflow Spillway (No. 1). and Berms over 4 feet in height. Piping See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Emergency Rock Missing See "Detention Ponds" (No. 1). See "Detention Ponds" Overflow Spillway (No. 1). Erosion See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Pre -settling Facility or sump 6" or designed sediment trap depth of Sediment is removed. Ponds and Vaults filled with Sediment sediment. I and/or debris I I I February 2005 Volume V —Runoff Treatment BMPs 4-33 Nee 8 of 11 No. 5 — Catch Basins Maintenande' Defect Con d itio-n s Wh e n M "a I nte na n ce I Is'Needed Results-E*pected When Coen ' in Mainte"nifice Is performe d General Trash & Trash or debris which is located immediately No Trash or debris located Debris in front of the catch basin opening or is immediately in front of blocking inletting capacity of the basin by catch basin or on grate more than 10%. opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free blocking more than 1/3 of its height. of trash or debris. Dead animals or vegetation that could No dead animals or generate odors that could cause complaints vegetation present within or dangerous gases (e.g., methane). the catch basin. Sediment Sediment (in the basin) that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes Damage to inches or cracks wider than 1/4 inch and cracks. Frame and/or Top Slab (intent is to make sure no material is running into basin). Frame not sifting flush on top slab, i.e., Frame is sitting flush on separation of more than 3/4 inch of the frame the riser rings or top slab from the top slab. Frame not securely and firmly attached. attached Fractures or Maintenance person judges that structure is Basin replaced or repaired Cracksin unsound. to design standards. Basin Walls/ Bottom Grout fillet has separated or cracked wider Pipe is regrouted and than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Basin replaced or repaired Misalignment function, or design problem. to design standards. Vegetation Vegetation growing across and blocking more No vegetation blocking than 10% of the basin opening. opening to basin. Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. 4-36 Volume V — Runoff Treatment BMPs February 2005 D'-- 0 -4:11 No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance Is:Needed Results Expected When Component Maintenance is performed Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid Cover can be removed by to Remove after applying normal lifting pressure. one maintenance person. (intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate opening Grate with opening wider than 7/8 inch. Grate opening meets (if Applicable) Unsafe design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s) of the Grate is in place and Missing. grate. meets design standards. No. 6 — Debris Barriers (e.g., Trash Racks) Maintenance Defect Condition When Maintenance is Results Expected When Components Needed Maintenance Is Performed General Trash and Trash or debris that is plugging more Barrier cleared to design flow Debris than 20% of the openings in the barrier. capacity. Metal Damaged/ Bars are bent out of shape more than 3 Bars in place with no bends more Missing inches. than 3/4 inch. Bars. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% Barrier replaced or repaired to deterioration to any part of barrier. design standards. Inlet/Outlet Debris barrier missing or not attached to Barrier firmly attached to pipe Pipe pipe February 2005 Volume V — Runoff Treatment BMPs 4-37 Paep. innf 11 No. 16 — Baffle Oifflater Separators (API Type) Maintenance Defect Condition When Maintenance* Is Results Expected When .Component Needed Maintenance is Performed' General Monitoring Inspection of discharge water for Effluent discharge from vault should obvious signs of poor water be clear with out thick visible sheen. quality. Sediment Sediment depth in bottom of vault No sediment deposits on vault Accumulation exceeds 6-inches in depth. bottom that would impede flow through the vault and reduce separation efficiency. Trash and Debris Trash and debris accumulation in Trash and debris removed from Accumulation vault, or pipe inletloutlet, vault, and inlet/outlet piping. floatables and non-floatables. Oil Accumulation Oil accumulations that exceed I- Extract oil from vault by vactoring. inch, at the surface of the water. Disposal in accordance with state and local rules and regulations. Damaged Pipes Inlet or outlet piping damaged or Pipe repaired or replaced. broken and in need of repair. Access Cover Cover cannot be opened, Cover repaired to proper working Damaged/Not corrosion/deformation of cover. specifications or replaced. Working Vault Structure Vault replaced or repairs made so Damage - Includes Cracks in Walls See "Catch Basins" (No. 5) that vault meets design specifications and is structurally Bottom, Damage to sound. Frame and/or Top Slab Cracks wider than 1/2-inch at the Vault repaired so that no cracks joint of any inlet/outlet pipe or exist wider than 1/4-inch at the joint evidence of soil particles entering of the inlet/outlet pipe. through the cracks. Baffles Baffles corroding, cracking, Baffles repaired or replaced to warping and/or showing signs of specifications. failure as determined by maintenance/inspection person. Access Ladder Ladder is corroded or Ladder replaced or repaired and Damaged deteriorated, not functioning meets specifications, and is safe to properly, not securely attached to use as determined by inspection structure wall, missing rungs, personnel. cracks, and misaligned. 4-48 Volume V— Runoff Treatment BMPs Februaty 2005 p;1 ain 11 r%f 11 REM Lovell-Sauerland &Associates, hic. Engineers/Surveyors/Planners Development. Consultants 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 LSAengineerm'g.com Stormwater Pollution Prevention Plan For. AND.ERSEN DEVELOPMEN Peak Job # 1064 Owner Jeanie Jansen 665 Edmonds Way Edmonds, 98020-4640 Prepared F oir Northwest Regional Office 3190 - 160th Avenue SE Bellevue, WA 98008-5452 425-649-7000 Developer Andersen Development 23632 HWY 99 Suite F PBM 502 Edmonds, Wa 98026-9205 425-771-6444 _eln Operator/Contractor DEC - 5 2008 Project Site Location BUILDING DEPARTMENT I CITY OF EDMONDS 665 Edmonds Way Edmonds, Wa 98020-4640 Certified Erosion and Sediment Control Lead .AARON TYSON 360-658-6986 SWPPP Prepared By PEAK ENGINEERING INC. 601 DELTA AVE, MARYSVILLE, WA 982-70 360-658-6986 BRIAN R. LINDSAY, DESIGN ENGINEER SWPPP Preparation Date June 13, 2008 Revised per City Review Dec 2, 2008 Approximate Project Construction Dates START DATE: October, 2008 END DATE: June'2009 C TV; i (10py 601 Delta Ave. * Marysville, WA 98270 PHONE (360) 658 -6986 - FAX (360) 658 -7826 - Website: peak-engineering.net ILI 7 Contents 1.0 Introduction ............................................................................................................................... I 2.0 Site Description ......................................................................................................................... 2 2.1 Existing Conditions ............................................................................................................ 2 2.2 Proposed Construction Activities and Drainage Information ........................................... 2 3.0 Construction Stormwater BMPs ............................................................................................... 3 3.1 The 12 BMP Elements ...................................................................................................... 4 3.1.1 Element #I — Mark Clearing Limits ................................................................ 4 3.1.2 Element #2 — Establish Construction Ac cess .................................................. 4 3.1.3 Element #3 — Control Flow Rates .................................................................... 5 3.1.4 Element #4 — Install Sediment Controls .......................................................... 5 3.1.5 Element #5 — Stabilize Soils ................................................. ; .......................... 6 3.1.6 Element #6 — Protect Slopes ............................................................................ 7 3.1.7 Element #7 — Protect Drain Inlets .................................................................... 8 3.1.8 Element'#8 — Stabilize Channels and Outlets .................................................. 8 3.1.9 Element #9 — Control Pollutants ...................................................................... 9 3.1.10' Element #10 — Control Dewatering ............................................................... 11 3.1.11 Element# I I —Maintain BMPs ...................................................................... 12 3.1.12 Element #12 — Manage the Project ................................................................. 12 3.2 Site Specific BMPs .......................................................................................................... 15 3.3 Additional Advanced BMPs ............................................................................................ 15 4.0 Construction Phasing and BMP Implementation ................................................................... 15 5.0 Pollution Prevention Team ....................................................................................................... 17 5.1 Roles and Responsibilities ................... *"**""*'***""**'****'*"'*'**'**"**'****"*"******'* ................ 17 5.2 Team Members ................................................................................................................ 18 6.6 Site Inspections and Monitoring ............................................................................................. 18 6.1 Site Inspection ................................................................................................................. 18 6.1.1 Site Inspection Frequency ........................... ................................................... 19 6.1.2 Site Inspection Documentation ....................................................................... 19 6.2 Stormwater Quality Monitoring ...................................................................................... 19 7.0 REPORTING AND RECORD KEEPING ............................................................................. 20 7.1 Recordkeeping ................................................................................................................. 20 7.1.1 Site Log Book ................................................................................................ 20 7.1.2 Records Retention .................................. 7.1.3 Access to Plans and Records ......................................................................... 20 7.1.4 Updating the SWPPP ...................................................................................... 20 7.2 Reporting ......................................................................................................................... 21 7.2.1 Discharge Monitoring Reports ...................................................................... 21 11 I 7.2.2 Notification of Noncompliance ..................................................................... 21 7.2.3 Permit Application and Changes ..................................................................... 21 Appendix A — Site plans Appendix B — Construction BMPs Appendix C — Alternative Construction BMPs Appendix D — General Permit Appendix E — Site Log Inspection Forms Appendix F — Engineering Calculations iii Stormwater Pollution Prevention Plan 1.0 Introduction Federal, State and County law requires construction site operators to manage their stormwater for sites larger than one acre.. The Department of Ecology administers these laws through the Construction Stormwater General Permit. For details on who needs a permit, see Ecology's publication: "How to Meet Ecology's Construction, Stormwater General Permit Requirements. A Guide for Construction Sites" The permit requires the construction site operator, to develop, use, and amend a Ston-nwater Pollution Prevention Plan (SWPPP). The purpose of the SWPPP is to reduce and prevent soil and other common construction pollutants from washing off the site and reaching streams, rivers, and other local water bodies. This Stormwater Pollution Prevention Plan (SVvTPP) has been prepared as part of the NPDES stormwater permit requirements for the Andersen Office Building construction project in City of Edmonds, Washington. This SWPPP describes the proposed construction activities and all temporary and permanent erosion. and sediment control measures (TESC), , pollution prevention measures, inspection/monitoring activities, and recordkeeping that will be implemented during the proposed construction project. The objectives of the SWPPP are to: Implement Best Management Practices (BMPs) to prevent erosion and sedimentation, and to identify, reduce, eliminate or prevent stormwater contamination and water pollution from construction activity. 2. Prevent violations of surface water quality, ground water quality, or sediment management standards. 3. Prevent, during the construction phase, adverse water quality impacts including impacts on beneficial uses of the receiving water by controlling peak flow rates and volumes of stormwater runoff at the Permittee's outfalls and downstream of the outfalls. This SWPPP was prepared based on the requirements set forth in the Construction Stormwater General Permit, Stormwater Management Manualfor Western Washington (SWMMWW 2005). The report is divided into seven main secti ' ons with several appendices that include stormwater related reference materials. The topics presented in the each of the main sections are: Section I — INTRODUCTION. This section provides a summary description of the project, and the organization of the SWPPP document. Section 2 — SITE DESCRIPTION. This section provides a detailed description of the existing site conditions, proposed construction activities, and calculated stormwater flow rates for existing conditions and post — construction conditions. Stormwater Pollution Prevention Plan Section 3 — CONSTRUCTION STORMWATER BMPs. This section provides a detailed description of the BMPs to be implemented based on the 12 required elements of the SWPPP. Section 4 — CONSTRUCTION PHASING AND BMP IMPLEMENTATION. This section providesa description of the timing of the BMP implementation in relation to the project schedule. Section 5 — POLLUTION PREVENTION TEAM. This section identifies the appropriate contact names (emergency and non -emergency), monitoring personnel, and the onsite temporary erosion and sedimentation control inspector Section 6 — SITE INSPECTIONS AND MONITORING. This section provides a description of the inspection and monitoring requirements such as the parameters of concern to be monitored, sample locations, sample frequencies, and sampling methods for all stormwater discharge locations from the site. Section 7 — REPORTING AND RECORDKEEPING. This section describes the requirements for documentation of the BMP implementation, site inspections, monitoring results, and changes to the implementation of certain BMPs due to site factors experienced during construction. Supporting documentation and standard forins are provided in Appendices A-F. 2.0 Site Description 2.1 Existing Conditions This project will construct a two story commercial office building, on a approximately 0.29 acre site. The site is located on the northeast side of Edmonds Way (SR 104) just north of 15 TH Street SW with a site address of 665 Edmonds Way. The existing- single-family residence and out buildings will be removed prior to construction. Vegetation found on site consists of lawn, native landscaping and some 3 d growth trees. The development area is relatively flat. The Soil Survey of Snohomish County identified the onsite surface soils as Alderwood urban complex (Hydrologic Soils Group Q. 2.2 Proposed Construction Activities and Drainage Information The project will provide a driveway access from Edmonds Way for the commercial office building. The site provides onsite parking with some additional covered parking area Within the 4 T Stormwater Pollution Prevention Plan building foot print. For sto'rmwater management a pipe detention facility has been sized according to the 1992 DOE drainage manual per city of Edmonds standards. Construction activities will include site preparation, TESC installation, demolition of the existing residence, excavation for the building foundations and detention pipe, site -wide grading, and asphalt paving. The schedule and phasing of BMPs during construction is provided in Section 4.0. The following summarizes -details regarding the site areas: Total site area: 0.29 acres Percent impervious area before construction: 35% Percent impervious area after construction: 63% Disturbed area during construction: 0.20 acres Disturbed area that is characterized as impervious (i.e., access. roads, staging, parking): 0.18 acres 2-year stormwater runoff peak flow prior to construction (existing): .01 cfs 1 0-year stormwater runoff peak flow prior to construction (existing): 0.03 cfs' 2-year stormwater runoff peak flow during construction:' 0.04 cfs 1 0-year stormwater runoff peak flow during construction: 0.06 cfs 2-year stormwater runoff peak flow after construction: 0.01 6fs 1 0-year stormwater runoff peak flow after construction: 0.03 cfs All stormwater flow calculations are provided in Appendix F. - For the pre -developed conditions, the 2yr, I Oyr and I 00yr 24hr storm events were modeled using the existing site condition to determine the pre -developed peak runoff rates. In modeling the existing conditions this analysis takes credit for the existing impervious surfaces that onsite. The existing and proposed impervious and pervious lawn and landscape area was calculated and used for the developed condition calculations. To match the ' existing conditions, flow restrictors have' been designed to release the detained runoff under developed conditions at 50% of the two year and 100% of the I 0-yr and I 00-yr storm events at the existing conditions peak rates. As required per Figure III-1.1 (Attached to the Appendix) a volume was calculated and factor of safety, of 3 Stormwater Pollution Prevention Plan 1.35 times the calculated detention capacity was used to determine the minimum required detention volume. 3.0 Construction Stormwater BMPs 3.1 The 12 BMP Elements 3.1.1 Element #1 — Mark Clearing Limits To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of construction will be clearly marked before land -disturbing activities begin. Trees that are to be preserved, as well as all sensitive areas and. their buffers, shall be clearly delineated, both in the field and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed state to the maximum extent possible. The BMPs relevant to marking the clearing limits that will be applied for this project include: High Visibility Plastic or Metal Fence (BMP C 103) * Orange Filter Fabric Fence will be used to delineate the onsite clearing limits. Alternate BMPs for marking clearing limits are included in Appendix C as a quick.reference tool for the onsite inspector in the event the BMPs listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D),. the Certified Erosion and Sediment Control Lead will promptly initiate the implementat ' ion of one or more of the alternative BMPs listed in Appendix C, after the first sign that existing BMPs are ineffective or failing. 3.11 Element #2 — Establish Construction Access Construction access or activities occurring on unpaved areas shall be minimized, yet where necessary, access points shall be stabilized to minimize the tracking of sediment onto public roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent sediment from entering state waters. All wash wastewater shall be controlled on site. The specific BMPs related to establishing construction access that will be used on this project include: 0 Stabilized Construction Entrance (BMP C105) 0 Construction Road/Parking Area Stabilization (BMP C107) Alternate construction access BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix 4 Stormwater Pollution Prevention Plan D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 3.1.3 Element #3 — Control Flow liates In order to protect the properties and waterways downstream of the project site, stormwater discharges from the site will be controlled. The specific BMPs for flow control that shall be used on this project include: 0 Temporary Sediment Pond (BMP C241) Alternate flow control BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, the project must comply with Minimum Requirement 7 (SWMMWW 2005). In general, discharge rates of stormwater from the site will be controlled where increases in impervious area or soil compaction during construction could lead to downstream erosion, or where necessary to meet local agency stormwater discharge requirements (e.g. discharge to combined sewer systems). 3.1.4 Element #4 — Install Sediment Controls All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP before leaving the construction site or prior to being discharged to an infiltration facility. The specific BMPs to be used for controlling sediment on this project include: 0 Gravel Filter Berm (BMP C232) 0 Silt Fence (BMP C233) 0 Storm Drain Inlet Protection (BMP C220) Alternate sediment control BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate 5 Stormwater Pollution Prevention Plan during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. In addition, sediment will be removed from paved areas in and adjacent to construction work areas manually or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires away from the site and to minimize wash off of sediments from adjacent streets in runoff. Whenever possible, sediment laden water shall be discharged into onsite, relatively level, vegetated areas (BMP C240 paragraph 5, page 4-102). In some cases, sediment discharge in concentrated runoff can be controlled using permanent stormwater BMPs (e.g., infiltration swales, ponds, trenches). Sediment loads can limit the effectiveness of some permanent stormwater BMPs, such as those used for infiltration or biofiltration; however, those BMPs designed to remove solids by settling (wet ponds or detention ponds) can be used during the construction phase. When permanent stormwater BMPs will be used to control sediment discharge'during construction, the structure will be protected from excessive sedimentation with adequate erosion and sediment control BMPs. Any accumulated sediment shall be removed after construction is complete and the permanent storinwater BMP will be restabilized with vegetation per applicable design requirements once the remainder of the site has been stabilized. The following BMPs will be implemented as end -of -pipe sediment controls as required to meet permitted turbidity limits in the site discharge(s). Prior to the implementation of these technologies, sediment sources and erosion control and soil stabilization BMP-efforts will be maximized to reduce the need for end -of -pipe sedimentation controls. . Temporary Sediment Pond (BMP C241) Construction Stormwater Filtration (BMP C25 1) Construction Stormwater Chemical Treatment (BMP C 250) (implemented only with prior written approval from Ecology). 3.1.5 Element #5 — Stabilize Soils Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be used on this project include: 0 Temporary and Permanent Seeding (BMP C120) rel Stormwater Pollution Prevention Plan 0 Plastic Covering (BMP C 123) Soils shall be continuously stabilized through out the life of the project. Alternate soil stabilization BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES C6nstruction Stormwater permit (as provided in Appendix D), the Certified Erosion a nid Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain exposed and unworked formore than 7 days during the dry season (May I to September 30) and 2 days during the wet season (October I to April 30). Regardless of the time of year, all soils shall be stabilized at the end of the shift before a holiday or weekend if needed based on weather forecasts. In general, cut and fill slo' es will be stabilized as soon as possible and soil stockpiles will be p temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, protected with sediment trapping measures, and where possible, be located away from storm drain inlets, waterways, and drainage channels. 3.1.6 Element #6 — Protect Slopes All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes erosion. The following specific BMPs will be used to protect slopes for this project: 0 Temporary and Permanent Seeding (BMP C120) Interceptor Swales upslope of top of banks will redirect runoff away from exposed slope areas. Alternate slope protection BMPs are included -in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 7 Stormwater Pollution Prevention Plan 3.1.7 Element #7 — Protect -Drain Inlets All storm drain inlets and culverts made operable during construction shall be protected to prevent unfiltered or untreated water from entering the drainage conveyance system. However, the first priority is to keep all access roads clean of sediment and keep street wash water separate from entering storm drains until treatment can be provided. Storm Drain Inlet Protection (BMP C220) will be implemented for altdrainage inlets and culverts that could potentially be impacted by sediment -laden runoff on and near the project site. The following inlet protection measures can be applied on this project: Drop Inlet Protection 0 Excavated Drop Inlet Protection 0 Block and Gravel Drop Inlet Protection 0 Gravel and Wire Drop Inlet Protection 0 Catch Basin Filters Alternative BMP not included in the SWMMWW (2005) or SWMMEW (20 04) Culvert Inlet Protection 0 Culvert Inlet Sediment Trap 9 Alternative BMP not included in the SWMMWW (2005) or SWMMEW (2004) If the BMP options listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D), or if no BMPs are listed above but deemed necessary during construction, the Certified Erosion and Sediment Control Lead shall implement one or more of the alternative BMP inlet protection options listed in Appendix C. 3.1.8 Element #8 — Stabilize Channels and Outlets' Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for channel and outlet stabilization that shall be used on this project include: 0 Check Dams (BMP C207) Rock check dams will be provided at 50' minimum spacing along all temporary sediment swales. Stormwater Pollution Prevention Plan Alternate channel and outlet stabilization BMPs are included in Appendix C as a quick reference tool for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project site is located west of the Cascade Mountain Crest. As such, all temporary on -site conveyance channels shall be designed, constructed, and stabilized to prevent erosion from the expected peak 10 minute velocity of flow from a Type I A, I 0-year, 24-hour recurrence interval storm for the developed condition. Alternatively, the I 0-year, I -,hour peak flow rate indicated by an, approved continuous runoff simulation model, increased by a factor of 1. 6, shall be used. Stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent streambanks, slopes, and downstream reaches shall be provided at the outlets of all conveyance systems. 3.1.9 Element #9 — Control Pollutants All pollutants, including waste materials and demolition debris, that occur onsite shall be handled and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping and preventative measures will be taken to ensure that the site will be kept clean, well organized, and free of debris. If required, BMPs to be implemented to control specific sources of pollutants are discussed below. Vehicles, construction equipment, and/or petroleum product storage/dispensing: All vehicles, equipment, and petroleum product storage/dispensing areas will be inspected regularly to detect any leaks or spills, and to identify maintenance needs to prevent leaks or spills. On -site fueling tanks and petroleum product storage containers shall include secondary containment. Spill prevention measures, such as drip pans, will be used when conducting maintenance and repair of vehicles or equipment. In order to perform emergency repairs on site, temporary plastic will be placed beneath and, if raining, over the vehicle. Contaminated surfaces shall be cleaned immediately following any discharge or spill incident. Chemical storage: 0 Stormwater Pollution Prevention Plan Any chemicals stored in the construction areas will conform to the appropriate source control BMPs listed in Volume IV of the Ecology stormwater manual. In Western WA, all chemicals shall have cover, containment, and protection provided on site, per BMP C 15 3 for Material Delivery, Storage and Containment in SWMMWW 2005 Application of agricultural chemicals, including fertilizers and pesticides, shall -be conducted in a manner and at application rates that will not result in loss of chemical to stormwater runoff. Manufacturers' recommendations for application procedures and rates shall be followed. Excavation and tunneling spoils dewatering waste: Demolition: Dewatering BMPs and BMPs specific to the excavation and tunneling (including handling of contaminated soils) are discussed under Element 10. Dust released from demolished sidewalks, buildings, or structures will be controlled using Dust Control measures. (BMP C140). Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or debris will be protected using Storm Drain Inlet Protection (BMP C220 as described above for Element 7). Process water and slurry resulting from sawcutting and surfacing operations will be prevented from entering the waters of the State by implementing Sawcutting and Surfacing Pollution Prevention measures (BMP C152). Concrete and grout: Process water and slurry resulting from concrete work will be prevented from entering the waters of the State by implementing Concrete Handling measures (BMP C 15 1). Sanitary wastewater: Portable sanitation facilities will be firmly secured, regularly maintained, and emptied when necessary. Wheel wash or tire bath wastewater shall be discharged to a separate on - site treatment system or to the sanitary sewer as part of Wheel Wash implementation (BMP C 106). Solid Waste: Other: Stormwat&r Pollution Prevention Plan Solid waste will be stored in secure, clearly marked containers. Other BMPs will be administered as necessary to address any additional pollutant sources on site. - This project does not require a Spill Prevention, Control, and Countermeasure (SPCC) Plan under the Federal regulations of the Clean Water Act (CWA). 3.1.10 Element #10 — Control Dewatering All dewatering water from open cut excavation, tunneling, foundation work, trench, or underground vaults shall be discharged into a controlled conveyance system prior to discharge to a sediment trap or sediment pond. Channels will be stabilized, per Element #8. * Clean, non - turbid dewatering water will not be routed through stormwater sediment ponds, and will be discharged to systems tributary to the receiving waters of the State in a manner that does not cause erosion, flooding, or a violation of State water quality standards in the receiving water. Highly turbid dewatering water from soils known or suspected to be contammated, or from use of construction equipment, will require additional monitoring and treatment as required for the specific pollutants based on the receiving waters intowhich the discharge is occurring. Such monitoring is the responsibility of the contractor. However, the dewatering of soils known to be free of contamination will trigger BMPs to trap sediment and reduce turbidity. At a minimum, geotextile fabric socks/bags/cells will be used to filter this material. Other BMPs to be used for sediment trapping and turbidity reduction include the following: 0 Concrete Handling (BMP C151) 0 Temporary Sediment Pond (BMP C24 1) 0 Construction Stormwater Chemical Treatment (BMP C250) Construction Stormwater Filtration (BMP C 25 1) 0 Infiltration Use of a sedimentation bag, with outfall to a ditch or swale for srndll volumes of localized dewatering. I I Stormwatef Pollution Prevention Plan Alternative BMP not included in the SWMMWW (2005), or SWMMEW (2004) Alternate dewatering control BMPs are included in Appendix C as a -quick reference to ' ol for the onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in Appendix D),' the Certified Erosion and Sediment Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing. 3.1.11 Element #11 — Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued perf6nnance of their intended function. Maintenance and repair shall be conducted in accordance with each particular BMP's specifications. Visual monitoring of the BMPs will be conducted at least once every calendar week and within 24 hours of any rainfall event that causes a discharge from the site. If the site becomes inactive, and is temporarily stabilized, the inspection frequency will be reduced to once every month. All temporary erosion and sediment control BMPs shall be removed within 30 days after the final site stabilization i's achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently stabilized. 3.1.12 Element #12 — Manage the Project Erosion and sediment control BMPs for this project have been designed based on the following principles: Design the project to fit the existing topography, soils, and drainage patterns. 0 Emphasize erosion control rather than sediment control. 0 Minimize the extent and duration of the area exposed. E Keep runoff velocities low. 0 Retain sediment on site. 0 Thoroughly monitor site and maintain all ESC measures. N Schedule major earthwork during the dry season. 12 Stormwater Pollution'Prevention Plan In addition, project management will incorporate the key components listed below: As this project site is located west of the Cascade Mountain Crest, the project will be managed according to the following key project components: Phasing of Construction The construction project is being phased to the extent practicable in order to prevent soil erosion, and, to the maximum extent possible, the transport of sediment from the site during construction. Revegeta * tion of exposed areas and maintenance of that vegetation shall be an integral part of the clearing activities during each phase of construction, per the Scheduling BMP (C 162). - Seasonal Work Limitations From October I through April 30, clearing, grading, and other soil disturbing activities shall only be permitted if shown to the satisfaction of the local permitting authority that silt -laden runoff will be prevented from leaving the site through a combination of the following: Site conditions including existing vegetative coverage, slope, soil type, and proximity to receiving waters; and 0 Limitations on activities and the extent of disturbed areas; and 11 Proposed erosion and sediment control measures. Based on the information provided and/or local weather conditions, the local pennitting authority may expand or restrict the seasonal limitation on site disturbance. The following activities are exempt from the seasonal clearing and grading limitations: 11 Routine maintenance and necessary repair of erosion and sediment control BMPs; E] Routine maintenance of public facilities or existing utility structures that do not expose the soil or result in the removal of the vegetative cover'to soil; and 13 Stormwater Pollution Prevention Plan 11 Activities where there is 100 percent infiltration of surface water runoff within the.site in approved and installed erosion and sediment control facilities. Coordination with Utilities and Other Jurisdictions Care has been taken to coordinate with utilities, other construction projects, and the local jurisdiction in preparing this SWPPP and scheduling the construction work. Inspection and Monitoring, All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. Site inspections shall be conducted by a person who is knowledgeable in the principles and practices of erosion and sediment control. This person has the necessary skills to: 11 Assess the site conditions and construction activities that could - impact the quality of stormwater, and 0 Assess the effectiveness of erosion and sediment control measures used to control the quality of stormwater discharges. A Certified Erosion and Sediment Control Lead shall be on -site or on -call at all times. Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design changes shall be implemented as scion as possible. Maintaining an Updated Construction SWPPP This SWPPP shall be retained on -site or within reasonable access to the site. The SWPPP shall be modified whenever there is a change in the design, construction, operation, or maintenance at the construction site that has, or could hlive'. a significant effect on the discharge of pollutants to waters of the state. The SWPPP shall be modified if, during inspections or investigations conducted by the owner/operator, or the applicable local or state regulatory authority, it is determined that the SWPPP is ineffective in 14 Stormwater Pollution Prevention Plan eliminating or significantly minimizing pollutants in stormwater discharges from the site. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) days following the inspection. 3.2 Site Specific BN[Ps Site specific BMPs are shown on the TESC Plan Sheets and Details in Appendix A. These site specific plan sheets will be updated as per DOE code. 3.3 Additional Advanced BMPs BMP C250: Construction Stormwater Chemical Treatment BMP C25 1: Construction Stormwater Filtration. , 4.0- Construction Phasing and BMP Implementation The BMP implementation schedule will be driven by the construction schedule. The following provides a sequential list of the proposed construction schedule milestones and the corresponding BMP implementation schedule. The list contains key milestones such as wet/dry season construction dates. The BMP implementation schedule listed below is keyed to proposed phases of the . construction project, and reflects differences in.BMP installations and inspections that relate to wet season construction. The project site is located west of the Cascade Mountain Crest. As such, the dry season is considered to be from May I to September 30 i and the wet season is considered to be from October I to April 30. 0 Dry Season starts: 05/01/2008 * Estimate of Construction start date: 10/01/2008 * Mobilize equipment on site: WEEK ONE Mobilize and store all Erosion and Sedimentation Control (ESC) and soil stabilization products (store material s_ on'hand BMP C 150): WEEK ONE 15 Stormwater Pollution Prevention Plan • Site inspections and monitoring conducted weekly and for applicable rain events as detailed in Section 6 of this SWPPP: WEEK ONE • Install ESC measures: WEEK TWO • Install stabilized construction entrance: WEEK TWO • Begin clearing and grubbing: WEEK TWO • Excavation for vault foundations: WEEK FOUR • Soil stabilization on excavated side slopes (in idle, no work areas as shown on ESC plans): WEEK FOUR • Excavate and install new utilities and services: WEEK SIX • Complete utility construction: WEEK SEVEN • Site grading begins: WEEK FIVE • Site grading ends: SPRING • Final landscaping and planting begins: SPRING • Permanent erosion control measures (hydroseeding): FALL Begin implementing soil stabilization and sediment control BMPs throughout the site in preparation for wet season: WEEK SIXTEEN • Wet Season starts: 10/01/2008 • implement Element #12 BMPs and manage site to minimize soil disturbance during the wet season 10/01/2008 • Estimate of Construction finish date: 06/01/2009 16 Stormwater Pollution Prevention Plan 5.0 Pollution Prevention Team 5.1 'Roles and- Responsibilities. The pollution prevention team consists of personnel responsible for implementation of the SWPPP, including the following: Certified Erosion and Sediment Control Lead (CESCL) — primary contractor contact, responsible for site inspections (BMPs, visual monitoring, sampling, etc.); to be called upon in case of failure of any ESC measures. Resident Engineer— For projects with engineered structures only (sediment ponds/traps, sand filters, etc.)-.' site representative for the owner that is the project's supervising engineer responsible for inspections and issuing instructions and drawings to the contractor's site supervisor or representative Emergency Ecology Contact — individual to be contacted at Ecology in case of emergency. Emergency Owner Contact — individual that is the site owner or representative of the site owner to be contacted in the case of an emergency. Non -Emergency Ecology Contact — individual to be contacted at Ecology in case of non -emergency. Monitoring Personnel — personnel responsible for conducting water quality monitoring; for most sites this person is also the Certified Erosion and Sediment Control Lead. I- 17 Stormwater Pollution Prevention Plan 5.2 Team Members Names and contact information for those identified as members of the pollution prevention team are provided in the following table. Title Name(s) Phone Number Certified Erosion and Sediment Control Lead (CESCL) AARON TYSON 360-658-6986 Resident Engineer C. Scott Stewart 360-658-6986 Emergency Ecology Contact Raman lyar (NW Regional Office) 425-649-7000 Emergency Owner Contact 425-771-6444 Non -Emergency Ecology Contact Carrol Johnson (Olympia) 360-407-6437 Monitoring Personnel AARON TYSON 360-658-6986 6.0 Site Inspections and Monitoring Monitoring includes visual inspection, monitoring for water quality parameters. of concern and documentation of the inspection and monitoring findings in a site log book. A site log book will. be maintained for all on -site construction activities and will include: A record of the implementation of the SWPPP and other permit requirements; - Site inspections reports For convenience, a sample inspection form is included in this SWPPP. This SWPPP may be included in the site log book if desired, or the inspection forms may be separated and. included in a separate site log book. However, if separated, the site log book and the SWPPP report and drawings must be maintained on -site or within reasonable access to the site and be made available upon request to Ecology or the local jurisdiction. 6.1 Site Inspection; All BMPs will be inspected, maintained, and repaired as needed to assure continued performance of their intended ftmct I ion. Site inspections will be conducted by a person who is, knowledgeable in the principles and practices of erosion and sediment control. The onsite inspector will have the skills to assess the potential for water quality impacts as a result of the type of construction activities occurring on site, and the knowledge of the appropriate and effective ESC measures needed to control the quality of stormwater discharges. 18 Stormwater Pollution Prevention Plan All BMPs will be inspected, maintained, and repaired as needed to assure continued performance of their intended, function. The inspector will be a Certified Erosion and Sediment Control Lead (CESCL) per BMP C 160. The name and contact information for the CES C^L is provided in Section 5.2 of this SWPPP. Site inspections will occur in all areas disturbed by construction activities and at all stormwater discharge points. Stormwater will be examined for the presence of suspended sediment, turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be documented in the site log book. All new BMPs or erosion control design changes will be documented in the SWPPP within seven (7) days of the implemented revision. 6.1.1 Site Inspection Frequency Site inspections will be conducted at least once a week and within 24 hours following any rainfall event which causes a discharge of stormwater from the site. For sites with temporary stabilization measures, the site inspection frequency can be reduced to once every month. 6.1.2 Site Inspection Documentation The site inspector will record each site inspection using the site log inspection forms provided in Appendix E. As mentioned in the introduction to Section 6.0. The site inspection log forms may be separated from this SWPPP document, but will be maintained on -site or within reasonable access to the site and be made available upon request to Ecology or the local jurisdiction. 6.2 Stormwater Quality Monitoring The 45onstruction site is less than five acres in size, and does not discharge to an impaired water body, and is therefore not subject to the general water quality monitoring requirements set forth in the 2005 Construction Stormwater General Permit (Appendix D). 19 Stormwater Pollution Prevention Plan 7.0 REPORTING AND RECORD KEEPING 7.1 Recordkeeping 7.1.1 Site Log Book A site log book will be maintained for all on -site construction activities and will include: A record of the implementation of the SWPPP and other permit requirements; Site inspections reports Stormwater quality monitoring if required. 7.1.2 Records Retention Records of all monitoring information (site log book, inspection reports/checklists, etc.), for this Stormwater Pollution Prevention Plan, and any other documentation of compliance with permit requirements will be retained during the life of the construction project and for a minimum of three years following the termination of permit coverage in accordance with permit condition S5.C. 7.1.3 Access to Plans and Records The SWPPP, General Permit, Notice of Authorization letter, and Site Log Book will be retained on site or within reasonable access to the site and will be made immediately available upon request to Ecology or the local jurisdiction. A copy of this SWPPP will be provided to Ecology within 14 days of receipt of A written request for the SWPPP from Ecology. Any other information requested by Ecology will be submitted within a reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the public when requested in writing in accordance with permit condition S5.G. 7.1.4 Updating the SWPPP In accordance with Conditions S3, S4.13, and S9.13.3 of the General Permit, this SWPPP will be modified if the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges from the site or there has been a change in design, construction, operation, or maintenance at the site that has a significant effect on the discharge, or potefitia,l for discharge, of pollutants to the waters of the State. The SWPPP will be modified within seven (7) days of determination based on inspection(s) that additional or modified BMPs are necessary to correct problems identified, and an updated timeline for BM P implementation will be prepared. 20 Stormwater Pollution Prevention Plan 7.2 Reporting 7.2.1 Discharge Monitoring Reports Discharge Monitoring Report (DMR) forms will be submitted to the Department of Ecology as per the 2005 Construction Stormwater General Permit (Appendix D). 7.2.2 Notification of Noncompliance If any of the terms and conditions of the permit is not met, and it causes a threat to human health or the environment, the following steps will be taken in accordance with permit section S5.17: I Ecology will be immediately notified of the failure to comply. 2. Immediate action will be taken to control the noncompliance issue and to correct the problem. If applicable, sampling and analysis of any noncompliance will be repeated immediately and the results submitted,to Ecology within five (5) days of becoming aware of the violation., 3. A detailed written report describing the noncompliance will be submitted to Ecology within five (5) days, unless requested earlier by Ecology. In accordance with permit condition S4.F.6.b, the Ecology regional office will be notified if chemical treatment other than CO2 sparging is planned for adjustment of high pH water (see Section 5.0 of this SVvTPP for contact information). 7.2.3 Permit Application and Changes In accordance with permit condition S2.A, a complete application form will be submitted to. Ecology and the appropriate local jurisdiction (if applicable) to be covered by the General Permit. 21 Stormwater Pollution Prevention Plan Appendix A — Site Plans ANDERSEN OFFICE BUILDING SIV114, SWI14, SECTION 2$, TOWNS) .915 1-.—, ILI tot w lee AIRE ln'v-� 4 U BEL AIRE Dl�. 8 4, SAAFTARY SEWN NOTE. N\ V N'� X % LOT a 7. .0"o A SVI 2mm snmiF 8w A^—,= v molm XAK & TOPOOS~ A��kLffi R KE ING —TA A— —I-- -- —M PAX, (.") .".7420 WA7f ---------- ---- ------- -RKX&, TORN L. rX.L= -- FIRE DEPT PUWER ,MECTION (FDCI MRS-9 MY.&C-M& in now Air 1EXAMM CLEANOUT �MSMW GADLE) C" nii�;.slllom vffmmTToN summif cs"r 19 m -T ~M FOR ommmm 4- Z-1. Mm a, =X DUAL GRAOM UTIMIT us msru awwa PROJECTNO. 1064 MWE BE&MG awc eame, DRAmaE& umffy am C2 U.M. V=—'— OF3 Stormwater Pollution Prevention Plan Appendix B — Construction BMPs Orange Filter Fence (Silt Fence) (BMP C233) Stabilized Construction Entrance (BMP C105) Rock Check Dam (BMP C207) Geotextile-Encased Check Dam (BMP C�08) Straw Bale Barrier (BMP C230) Storm Drain Inlet Protection (BMP C220) Temporary and Permanent Seeding (BMP C 120) FIL 7ER FABRIC - SECURED TO 2 " X 2 14 GA. WRE FABRIC EQUAL 2"X2" WOOD OR Q EQUIVALENT :1�114 8 "_ 12" 8 PL A CE J14 "_ 1. 5 " WA SHED GRA VEL IN THE 7RENCH AND ON BOTH SIDES OF FIL7ER FABRIC FENCE ON 7HE SURFACE CONTRACTORIDEVELOPER SHALL MAINTAIN AND REPLACE S7RAW BALES TO INSURE PROPER EROSION CON7ROL. TEMPORA R Y FILTER FABRIC FENCE N. TS. IC90-199V DATE FIL7ER FABRIC MATERIAL IN CONTINOUS ROLLS. USE STAPLES ORWRE RINGS TO ATTACH FABRIC TO WRE. WRE MESH SUPPORT FENCE TO SUPPORT FILTER FABRIC. BURY BOTTOM OF FIL7ER 14ATERIAL 8" TO 12" .9 911 "m 2" X 2" WOOD POSTS OR EQUIVALENT CITY INSPEC77ON REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. STANDARD DETAIL FILTER FABRIC FENCE FILTRATION SYSTEMS ---I PATE 7/24/01 1 SCALE NTS I DWG No' E1.1 ,l CON7RACTOR SHALL MAINTAIN TEMPORARY CONSTYUCTION ENTRANCE DURING 7HE CONS7RUC7lON PERIOD. Cl TY INSPEC 77ON REQUIRED ON ALL. EROSION CON TROL MEASURES BEFORE WORK CAN BEGIN. I elgo- 1 9qu .0-'N.'*D C.- I -TY"---."'- I I REVISIONS STANDARD DETAIL D. GEBERT 10/6/03 STABILIZED CONSTRUCTION ENTRANCE DATE 7/24/01 1 SCALE NTS I DWG No' E1.2 I CITY INSPEC77ON REQUIRED ON ALL EROSION CON7ROL MEASURES BEFORE WORK CAN BEGIN. D S. REVISIONS STANDARD DETAIL APPROVED BY DATE D. GEBERT 10/06/03 D, GEBERT 05/19/05 TEMPORARY SEDIMENT TRAP FOR CATCH BASINS D. GEBERT 05/05/06 DATE SCALE DWG NO S io-3 a 1 1 18 _19C 7/24/01 NTS E1.3 L 4 GRA. 7E A�..CBI FIL TER SOCK W 7H I OVER FLOW HOLES I CA TCH BASIN I STRAW BALES MAY BE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL E1.1.1). 7HIS APPLICAITON SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCITON PERIOD. "I 1 9 Stormwater Pollution Prevention Plan Appendix C — Alternative BMPs The following includes a list of possible alternative BMPs for 7 of the elements not described in the main SWPPP text. This list can be referenced in the event a BMP f6r a specific element is not functioning as designed and an alternative BMP needs to be implemented. Element #1 - Mark Clearing Limits: C 10 1 — Preserving Natural. Vegetation Element #2 - Establish Construction Access: C 106 — Wheel Wash Element #3 - Control Flow Rates:-, C240 - Sediment Trap Element #4 - Install Sediment Controls: C235-Straw Wattles Element #5-- Stabilize Soils:- C130 Surface Roughening Element #6 - Protect Slopes: C206-Level Spreader Element #8 - Stabilize Channels and Outlets: C209 Outlet Protection Stormwater Pollution Prevention Plan Appendix D — General Permit '. I . 9 Stormwater Pollution Prevention Plan Appendix E — Site Log Inspection Forms The results of each inspection shall be summarized in an inspection report or checklist that is entered into or attached to the site log book. It is suggested -that the inspection report or checklist be included in this appendix to keep monitoring and inspection information in one document, but this is optional. However, it is mandatory that this SWPPP and the site inspection forms be kept onsite at all times during construction, and that inspections be performed and documented as outlined below. At a minimum, each inspection report or checklist shall include: a. Inspection date/times b. Weather information: general conditions during inspection, approximate amount of precipitation since the last inspection, and approximate amount of precipitation within the last 24 hours. C. A summary or list of all BMPs that have been implemented, including observations of all erosion/sediment control structures or practices. d. The following shall be noted: i. locations of BMPs inspected (see drawings) ii. locations of BMPs that need maintenance, iii. the reason maintenance is needed, iv. locations of BMPs that failed to operate as designed or intended, and V. locations where additional or different BMPs are needed, and the reason(s) why e. A description of stormwater discharged from the site. The presence of suspended sediment, turbid water, discoloration, and/or oil sheen shall be noted, as applicable. f. If applicable, a description of any water quality monitoring performed during inspection, and the results of that monitoring. 9. General comments and notes, including a brief description of any BMP repairs, maintenance or installations made as a result of the inspection.' h. A statement that, in the judgment of the person conducting the site inspection, the site is either in compliance or out of compliance with the terms and conditions of the SWPPP and the NPDES permit. If the site inspection indicates that the site is out of Stormwater Pollution Prevention Plan compliance, the inspection report shall include a summary of the remedial actions required to bring the site back into compliance, as well as a schedule of implementation. Name, title, and signature of person conducting the site inspection; and the following statement: "I certify under penalty of law that this report is true, accurate, and complete, to the best of my knowledge and belief'. When the site inspection indicates that the site is not in compliance with any terms and conditions of the NPDES permit, the Permittee shall take immediate action(s) to: stop, contain, and clean up the unauthorized discharges, or otherwise stop the noncompliance; correct the problem(s); implement appropriate Best Management Practices (BMPs), and/or conduct maintenance of existing BMPs; and achieve compliance with all applicable standards and permit conditions. In addition, if the noncompliance causes a threat to human health or the environment, the Permittee shall comply with the Noncompliance Notification requirements in Special Condition S5.17 of the permit. Stormwater Pollution Prevention Plan Appendix F — Engineering Calculations (DETAILED CALCULATIONS ARE LOCATED IN THE DRAINAGE REPORT) TnE STAKES TO I PARALELL, UN50ARRED AND I UND15TURBED 5U54' FERTILIZE ALI- M APPRO\/EP 5TAP-1 APPLIED AT MANU 5uc-jc-vE5TeV RATE. PLANT TREE I" HI6 THAN DEPTH &RO� NURSERY. CvUIrl" APARA7V- 1/21, REINFORCED 12 0A C7AL\/. V41RE 2x2 DOU6LAS FIS 2" DEPTH BARK tv BAE 41, KATERINC SURROUNDIN6 TM FINISHED 6RADE FULL BURLAP OF1 OF ROOT15ALL PLANTINIS, MIX 5A See 6eNERAL NC SCARIFY PLANTIt EX15TIN& SUP&W SET ROOTBALL OF coMPAr_,TF_V 5ACKFILL MIX A A R,1 TREE PLmumTING Uff"ETAI i Cie' ­4LE.- I" = 1'-0" 21, DEPTH BARK MULCH 4" ViATERINGs BASIN SURROUNVIN6 PLANT ZZ RE_MO\1e 5URLAP FROM TOP 1/5 OF ROOTEIALL. LI6HTLY-1-,,,, SCARIFY ROOTBALL OF CONTAINIER-61ROViN PLANTS.= PKIOFt To BACKFILLIN& EXISTIN& 5L1B&RAA00E PLANTIN(SOACK FILL MIX. SEE (5 . ENERAL NOTES SCARIFY PLANTIN6 PIT NALL SET. ROOTDALL ON MOUND OF COMPACTED PLANTINO 5ACKFILL MIX SHRUB DETAIL VALZ L 0 PLANT SHIIRM I" HICPHIM THAN DEPTH &ROM AT wftmy. o 19!RTILIZE ALL PLANTS V41TH, i XVPKOVW5TAKTMMMILIZF_R 2 TIMES APPLIW AT MANUF`A4TL"MR'S .A-. ;Z= A- I I t"Irl I& Sj"ESTED FtATES - nommomm� t!�i . C_^rm efz,e .11 f' —A' -Z;�' _\A 46C PLANT SCHEDULE'. SYMBOL 1 0 ED'- na I I W.I. .... ....... 0 ......... ......... 655 EPMONDS ViAY ... ...... '1416H -------- ....... .. ................ OFFICE BUILPIN& 2 STORY OVEN F E .......................... ... ......... ...................... ............ ............ . .......... ............................................. ................. ........ ............................................ ................. 0 ............... .................................... ............. ....................... ............. I ....... ................ ........ I ................... .......... ....... ......... I ............... ........................... 1*111117.7.7 ............... . ............... LAWN' .............. I ........... . ................................ ... .. . ................... ..................... .......... ............. %weew - . --I*.",.*.*.*.*.*.,.*.,.,.,.,.,.,,,.,I - .. ............... TO 26-1216 � ............ ..... ....... . ......... 1115 264.' ................... It e ............. 11.7.1114 .......... P NE 1021 01, ol .... . . ...... 11 LAN <I ................... . ... M ...... C'.11%ftof ........... ... .......... CIS FH..... .... . .. TE 2&6,b4 ..................... ............................................ . ........................................... . . . .... IE 28424 7:1 - . - . - . - ,. - . - . - . - . - . - . - I 'A/ .............. .................. *.*.­:­***­ 2 ...................................... . .......... .............. ... ... 4#1 PVC, I- .......................... I .......... IE 265.4q 1t. . ; . I V-1.7-1.1-7. . . . . . . 4 . . . . . . , . .:. . .:. . ..... .... .. :1.. ............. .......... ............................... V' HOPE N V.1.7.4.- 1 \ I ... ...................... Aw "Awl . ........ ... -C) .................. ........................... CE, Te 28,5%76 .................. + la,265.re t"IRTiELEVATION) . . . . . . ................... v4m w2w ap E A ir: 2815.65 12!1 CP N �5'HIOH dr-O' HI&H NOOVE 3FR 6 TMLIS %jrr\ EXISTING* W 0 J TRAS 4 N CONVERTE- 0 ENCLO pi SX Ib ro Tnsak 15T DAY CARE O�RILM IN TYPE 11112 TO PRON/10F. C4749k V41THIN (5) YEARS, H CON Ina dy, 0 N Ec"Tc C W11- A' 7 E 2 K Ulm "J%pi-ne < 1\1 N 13 bit ExtkWEP < = C-URSIN&\ 711 (IYPICAP ->< 4 NIO-I'ED Aq 5� 1;�y Cl -r,4, SUMrr fiWLT TO _AA 22" C4N 14 A/ NORTH 34 We 1, rA w: pis Ron% K ^APE .00P LAN Li 4 PL AN A Planning Division conditions of approval: I . Individual elements of this project are required to meet all applicable city codes, and it is the responsibility of the applicant to apply for and obtain all 26" CON necessary permits. 2. Tree and plant sizes and spacing shall comply with minimum sizes and N maximum spacing of ECDC 20.13.015 and the City's Street Tree Plan. ALE 3. Trees within the Type IV landscaping area (adjacent to the southwestern property line) shall be free of branches below six feet in height, and shrubs within this area shall be maintained at a maximum height of 3.5 feet. 4. An extruded curb four to six inches in height must be installed between 2 CON parking stalls # 10 and #I I and the landscaping area pursuant to the pLANNING requirements of ECDC 20.13.020.D. 101, R 13 .4.0h.10 11::7.*.111 ............... 1)30) ................. 'WOW .......... ............... .......... ................. �OJILDING UEPARIVAEW 011'y OF EMhONDS ON %ki RANDALLJ. MUNSON BUILDING DESIGNER 1930 6TH AVENUE SOUTH SUITE 301 SEATTLE WASHINGTON 98134 VOICE (206) 349-4551 FAX (866) 312-8468 COPYRIGHT NOTICE THIS PLAN IS ISSUED FOR CONSTRUCTION PURPOSES 13Y THE WENT INDICATED. REPRODUCTION OR USE OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF DESIGNER, RANDALL J. MUNSON. IS PROHIBITED. ARCHITECT MAINTAINS ALL RIGHT UNDER STATE AND FEDERAL LAW, INCLUDING COPYRIGHT. CONTRACTOR NOTICE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ANY DIMEN- SIONAL ERRORS. OMISSIONS OR oISCREPANCIES BEFORE BEGIN- NING OR FABRICAnNG ANY WORK DO NOT SCALE DRAWiNG3. REVISION8 No. DGW ROM CITY OF 2L 00.08.10 EDMONDS CITYOF 07.23.10 EDMONDS W < 0� Z W 0 1,- Z All W VJ Z () 04 C i: 0 0 Z Z IL U ui �— dZ Z Q 5 Z U :D co — X LU a P W UL C/) a U J 0 T Z CD 0 CD C4 LANDSCAPE PLAN and DETAILS PROJECT NO. : DESIGN : RJM. DRAWN RJM ISSUE DATE 04.02.10 04 JESUE AW I ?- 2010 01_��*Nll I& nowsk M HrxOJECT DATA I ONNER NAME &ROA Y41TH US LEARNIN6 CENTERS 21515 54th AVENUE NEST EDMONDS, NA5HIN6TON ciaO26 (425) 112-2115 51TE ADDRESS (565 EDMONDS NAr TAX ACCOUNT NUMBER 2-10525-005-050-00 LE&AL DESCRIPTION THAT PORTION OF THE NORTHEAST OUARTER OF THE5OUTHAE5T GUARTER OF THE SOUTHAEST aUARTER OF SECTION 25, TONN5HIF 2-1 NORTH, RAN&E 5 EAST, A.M., DESCRIBED AS FOLLON5: BEOINNIN6, AT THE NORTHEAST CORNER OF SAID NORTHEAST OUARTER OF THE 5OUTHAEST GUARTER OF THE 5OUTHNE5T GUARTER: THENCE NORTH 58cI52'O-7" NEST 516AO FEET TO THE NORTHEASTERLY LINE OF PAVED COUNTY ROAD; THENCE SOUTH 35clo5l EAST ALON& SAID ROAD 614.11 FEET TO THE TRUE POINT OF BE61NNIN16; THENCE NORTH 50d551 EAST TO THE EAST LINE OF SAID NORTHEAST GUARTER OF THESOUTHNEST GUARTER OF THE SOUTHAE5T GZUARTER' THENCE SOUTH ALON6 SAID EAST LINE TO AN INTERSECTION NITH THE NORTHEASERLt' LINE OF SAID PAVED COUNTY ROAD; THENCE NORTHNE5TERLY ALON6 THE NORTHEASTERLY LINE OF SAID ROAD TO THE TRUE POINT OF BE&INNIN(5. EXCEPT THAT PORTION THEREOF CONVEYED TO THE STATE OF NA5HINc7TON BY DEED RECORDED UNDER AUDITOR'S FILE NO. 2164265 SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF NA5HINr7TON BUILDIN6 PE516NER RANDALL J. MUN50N 1600 (oth AVENUESOUTH - SUITE 301 SEATTLE, NA5HINCTON c[5154 (206) 545-4551 (e)(56) 512-5465 ARCHITECT OF RECORD JOHN 6. NASON 14405 5.E. 26(oth STREET KENT, AA5HINrvTON c15042 (.255) 651-02c[4 STRUCTURAL F-NC71NEER REED 4 ASSOCIATES a511 212th STREET 5.N. EDMONDS, NA5HIN6TON c[802(5 (425) Ila-21c[5 (425) -7-75-20-75 FAX 6EOTECHINCAL EN61NEER HAA rzE05CIENOE5, INC. 21512 50th DRIVE 5.E. SUITE 110 BOTHELL, NASHINrvTON c15021 (425) -7-74-010(o (425) '774-2-114 FAX CIVIL EN&INEER LOVELL-SAUERLAND $ ASSOCIATES Icf2l-f 56th AVENUE NEST - SUITE IO(b LYNNNOOD, NASHIN6TON c1503(5 (425) '775-1511 SURVEYOR BT SURVEYS 12415 cIth DRIVE 5.E. EVERETT, NA5HIN&TON cl,5205 (425) 544-6251 Tf;ZAFF1C-F_Ne1NEER--- 61550N TI;;Z-AFF1C,-'00N5ULT1N6 280.2 NETMORE AVENUE EVERETT, NA5HIN(9TON c15201 (425) 55cl-82(66 LOT COVERArvE LOT AREA 12,524 SGUARE FEET LOT COVERA6E 25clo SaUARE FEET LOT COVERA&E AS A FEROENTArvE OF LOT AREA = 15,64% IMPERVIOUS OOVERAC7E BUILDIN& ADDITION, PATIO 1501 5GUARE FEET AND NALK EXISTIN6 HOUSE 1441 5OUARE FEET PRIVENAY 5500 5OUARE FEET TOTAL 5450 5OUARE FEET FLOOR AREAS EX15TINC7 1444 SOUARE FEET PROPOSED 552 5OUARE FEET PORCHES c14 SOUARE FEET 6LAZIN& AREA 355.50 5GUARE FEET 6LAZIN& AS A FEROENTA6E OF FLOOR AREA = 15.45% 2006 NA5HIN&TON STATE ENEROY CODE NINDON5 .55'U'VALUE OPTION No. 4 DOORS .20 'U'VALUE MEDIUM 6A5 FURNACE FARKIN6 (1) STALL PER EMPLOYEE ond (1) STALL PER (5) CHILREN (4) EMPLOYEE 5TALL5 and (10) CHILDREN.5-TALL5 = 14 STALLS REOUIRED PARKINr-v PROVIDED (14) STALLS CODE ANALY515 (0W16EPIH6, 91 'Et:i= PER,%���� A d I __ I I ........ ... ............. .... .......... ................ ....... .......... ­­* ...... .......... ­ .......... ................. .. ..... *****'' ..................... .. ............ ............ ................. ..... ...... ....................... .... ... .................... ...... . .. .................................. ..... . ..................... ...... .......... ....... .................... ..... ........... ........................ (555 EDMONDS ViA'T' ........................... ...................... .......................... ...................... ........................... :2 STORY OFFICE BUILDIN6 ...................... .......... .... 1< .......................... ..................... ................... ...................... .................... ............... : IK -N ........... ....... NOODE ..... ............... N� vp .................. . . ................... .... ­*1111111*11111111* ..... -ENOE .................................... r ................................. ....... .............................. ........... ....... ............... ........ ............... 6' H I & H ........ ... ............................ .......................................... ................. NOODEN ........... ..... .............. .............................. ...................... ....... ........ ..................................... ............... ....... F E N 0 E .... ....... .................... I ...... ........................... .. ......................... ........................... .......................... ........ ......................... OR ................... ....... . ......... ................. ......... ............... . TE 251.25 0 .............. ..... .......... IE 254:75 ................. ................... ...... .................... ................ ............ ....... ......... ........... .................. ................. 5" CF NE ............. ............ IE 254*7.4e) .......... ................ ........................ ................. .............. ............ IN .................... ...... ................ ....................... .......................... ................. ..... ................. .... ................ \ / . ........ ....................... ....... ... ... ...................... ................ ........ ................ ... ....... ....................... . ...... 5/41 ................ ...... .................. ....... ............... ................. .................. .................................. ................. ..................... ................... ......................... .... ........ ........................... FH ........ ............. TE 2ea)(65.54 ................. .................... ....... ......... ........ iE 254.24 ....... : : .... ......................... .......... .................. ........................... ... .. .. 4" FVO E ................................... IE 2a5.41 ............... ........ ........ ............... ........... .... .................. 05" HDFE N ................. . ........ ............................................... ...... Opos. ........................ ............... ....... ............ R .. . ....... E ...... ..................................................................... ..................................................................... -C ........ ERED Ov H................ ..... .. I ............. .................... ..... ........ c P RC :AD:D:IT . ........ PO .................... .... .. ............ I ................................................................ 0 M OIAL .................................................. I SIrvN ... ................................................................... ......................... ...... ............... .................... ......... OB ......... ............................................................................ TE :2e5_5,.7r5 ..................................................................... .......... .......... ............................................... ------- vim .............. OFE .... ............................ ......... .......... 44" 1 ............. A CONO ........ ... ... ............................ . IE 255.651 1 00 C, E D ... ....... ............. ....... 12" OF N 51 INA I< cl'-O" HI&H ............... 5'HlrvH I I t--N t-% 4'. xt R NOODEN TRA5 EE ELEV.) FENCE ENCLO5 E CONVERTE 4'-5 5/411 r I TIN"I N DAY CARE 10 PA frj_j J r643 TRASH 41 �y UP O�H Ec,TC$(:;TV 04c 0 5 013 1 a Cl rz 0 A-1.2 S ENA K z '7 \ \' - C ERED RQH_ 15, EXTRUDED CONCRETE OURBIN6\ < (TYPICAL) M 4 = ci El A-1. 6 NORTH 14 SITE P"'LAIN' SCALE: 1" 10'-011 3 10 'HI(5H AOOD�N FENCE ALON6 PROPERTY LINES loop 1 1 4' 0 c), VICIN"ITY MAP :I AF VED BY PLAWING Zone Corner��Flag o N -_Skctb_,a-h R r Front CSW 151 C'�' %-, L� - ul\j�> Fog! Nes &W) CONSTRUCTION TYPE TYPE V-5 i � I ic 6�5 _9N ''! �i 5�pivr�-,e F-�&r;m �- jOur M 02�0-A AJ I CA- I- ZONIN6 BF - PLANNED BUSINESS OCCUPANCY E Cil"y ofEdmonds Building Department] OOUFANO"r LOA (45) CHILDREN MAXIMUM (A6175 OF CHILDREN TO (4) EMPLOYEES BE SERVED 2 1//2 TO 12 YEARS) 1 A I x I e--p,-5-1-7-7 LIABILITY LIMIT NOTICE NOTICE: PRANIN6 FACKA6E PREPARED FOR FERMITTIN6 REVIEA ONLY. ARCHITECT NOT RESPONSIBLE FOR CONSTRUCTION COMPLIANCE UNLE55 RETAINED FOP, FULL INSPECTION SERVICES. NOTICE TO CONTRACTOR CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB 51TE AND NOTIFY THE ARCHITECT OF ANY DIMEN51ONAL ERRORS, OMI55ION5 OR DISCREPANCIES BEFORE BE&NNIN& OR. FABRICATIN(9 ANY AORK DO NOT SCALE DRANIN55 Other th' 4%ed q, E�Lht 10 4,kd eem pa az i:g�l V,46n %�t 03 ......................................... S U 0 �- ..................... ....... ............................ U AUG 12 2010 EXISTIN A\TCH ASIN ................ ...................... ONE)s ............. ............ RANDALLJ.MUNS ON BUILDING DESIGNER 1930 6TH AVENUE SOUTH SUITE 301 SEATTLE WASHINGTON 98134 VOICE (206) 349-4551 FAX (866) 312-8468 COPYRIGHT NOTICE THIS PLAN IS ISSUED FOR CONSTRUCTION PURPOSES BY THE CLIENT INDICATED. REPRODUCTION OR USE OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF DESIGNER, RANDALL J. MUNSON, IS PROHIBITED. ARCHITECT MAINTAINS ALL RIGHTS UNDER STATE AND FEDERAL LAW, .INCLUDING COPYRIGHT. CONTRACTOR NOTICE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ANY DIMEN- SIONAL ERRORS, OMISSIONS OR DISCREPANCIES BEFORE BEGIN- NING OR FABRICATING ANY WORK. DO NOT SCALE DRAWINGS. REVISIONS No. Date Item CITY OF 06.08.10 EDMONDS CITY OF Z& 07.22.10 EDMONDS z w 0 Z C/) w Z L) (D U.) Z 00 (0 Z — C14 Z C:) co IL Z 0 U) w - W 0 Z CO 0 0 j z f— 0) < U-) w LLI — >- 3: 1-- 3: < -M LL. U) c� L 0 0 cq 0 x Z I-- 0 C'q 0 11�- c') 2 'to ml C, 04 M C LLJ 14 SITE PLAN PROJECT DATA INDEX OF DRAWINGS LEGEND OF SYMBOLS '�IROJECT NO. DESIGN RJM DRAWN RJM ISSUE DATE 04.02.10 C13 N TE 256.54 GOMM5t��IAL 51(5N T E 2 a5 kNM E,265.5 X op E 2e)5.6 12" OF N v UP y NOODEN FENCE S4. �pz ................ .............................. ............................... ................................. .............................. ­­ .................................... ..................................... .................................... ........................ ...................... ..................... ................................. ............................... COV .............. PO Hr \ox, POINT'C.1- .................................... .................... I ........................ ............................................ 3 7 ............................................ .................. .......................... * . , . I . , . I . 1, .... ............ .............................. .................................... .................................... co rz ..................... ............... Sil I < 11 r/r 0 13 C cl 0 I z El­ lo 4 12 'El %sl 13 5>. /o� 14 \ + . . ol�000p) HEIGHT CALCULATION I& POINT - A I-' b2�. vz, POINT - B 4-/loZ­7Z_ POINT - 0 40 1 POINT - D TOTAL �s-s­ qog. qss- toz-,Z38 1 oz- DIVIDED Br 4 04=I;2'AVERA&E &RADE 02- 7 -IrzHT .38 :. . � + 25-0" MAXIMUM ALLONABLE HE I,zq.-7,5g --;,--:-'ACTUAL RIDOE ELEVATION A 4,p vhfoijl�a py Soj_tl >10 5 VNI 6H VEN ;E eE AiG 3 0 2010 ........................ ....................................... ................................ ............... .......................... .................................... 1­111111111111 .................................... RE4E, L �, AUG 12 2010 ........... 3L��?��qj[L?FP M'ME-�'J" RANDALL J. MUNSON BUILDING DESIGNER 1930 6TH AVENUE SOUTH SUITE 301 SEATTLE WASHINGTON 98134 VOICE (206) 349-4551 FAX (866) 312-8468 COPYRIGHT NOTICE THIS PLAN IS ISSUED FOR CONSTRUCTION PURPOSES BY THE CLIENT INDICATED. REPRODUCTION OR USE OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF DESIGNER, RANDALL J. MUNSON, IS PROHIBITED. ARCHITECT MAINTAINS ALL RIGHTS UNDER STATE AND FEDERAL LAW, INCLUDING COPYRIGHT. CONTRACTOR NOTICE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ANY DIMEN- SIONAL ERRORS, OMISSIONS OR DISCREPANCIES BEFORE BEGIN- NING OR FABRICATING ANY WORK. DO NOT SCALE DRAWINGS. REVISIONS No. Date Item CITY OF A06.08.10 EDMONDS A2 CITY OF 07.22.10 EDMONDS U) w z 0 Ill 1­- Z w Z C) (D 0 Lf) U) z m to — cq Z Z> C:) 0- w co < 0) U) C) w z w 0 F— F— Z 0 E5 Q Z r 0) U) F— (3) < LL 12 (3) C/) 04 0 C-4 Z 0 Cq o cy) 2 L0 to cy) 0 04 (D C\l LLJ HEIGHT PLAN PROJECT NO. DESIGN RJM DRAWN RJM ISSUE DATE 04.02.10 t�3 b st,hr x END OF TRASH ENOL05URE Y4ALL 5 1/2" 5TD, STEEL PIPE 6ATE P05T 4" OONCRETE5LA5 Y41TH &"x&"xY4I.41NI.4 MM O\/E 4" LArER COMPACTED ROCK BASE, SLOPE FLOOR 1/5" PER LIN. FT. TO rzATE OPENINS - MED. BRM. FIN. ASPHALT DRI\/E FLUSH TO CONCRETE --------------- 1% ------------------------ t 4" CONCRETE SLAB NITH (5"x&"xNI.41Y4I.4 Y41NM O\/ER 4" LArER COMPACTED ROCK BASE, SLOPE FLOOR 1/4" PER LIN. FT. TO 6ATE OPENIN6 - MED. BRM. FIN. 12" DIA. CONCRETE FOOTIN67 Y41TH EMBEDDED P05T (CENTERED) 1211 ' T-RASH ENCLOSURE SLAB APRON A CONCRETE DOME 6' DIAMETER CONCRETE FILLED STEEL POST, FAINT COLOR (P-I) ASPHALT FA\/IN& 0 (9 0 c� 0 all 5TANDARD D.O.T. APPORVED STOP 516N, COORDINATE Yqlth OIT'r OFFICIAL FOR PLACEMENT ancl 51ZE AT RIC5HT OF NAlr5 P CT111111I i (24" SIZE 7YFICAL ATSITE INTERIOR) EMBED IN CONCRETE AS 5HONN OR PER D.O.T. REOUIREMENT Ti =_­ F1 - F - JE 1 L J I Ifl STOP SIGN DETAIL 3 CALE: 1/2" 1'-0" 1EE1 I 1EE1 I 1EE1 I M1 I 1HEI r rb ""'V �-7 A-L.2 A-L.2 4" FAINT 5TRIFIN(5, kNHITE (2 COAT5) 7YPI CAL �1:2 VAN "\/AN" TO BE BLOCK PRINTED AITH 5TENOIL LETTERS TO BE 10" TALL MIN. NITH A NIDTH OF 1 1/2" MIN. TEMPLATE LEI I ER5 TO BE MECHANICALLY LAYED OUT INITH UNIFORM LETTER SIZE AND 5FACINry HANDICAPPED VAN STALL . ............ &'-0" HI&H SOLID OF-DAR 5CREENIN6 arewOncloswe r oved bT and aw —7- , I i _f V 14 t e- -X I 0 ate ce STANLEY #cil'7 CLICK LOOK 5AFErY PADLOCK q HASP (OR EGUAL AT CHAIN -LINK (5ATE5) CONO APRON NOTED ON SITE FLA 4" CONCRETE SLAB INITH "dv� BROM FIN15H - SLOPE TO 9 6ATE OPENIN6 -1.2 VF No ID Co W PRO\/IDE 5LEE\/E5 FOR EACH ol>C� Wi�6 0PCWiPG -M CANE E30LT IN ASPHALT and ONE AT ENCL05URE SLAB f4u, W(D-rw T ID A ENCLOSURE PLAN R1_%SH BLUE 5AOK&N<)UND NITH 1/4HITE 5"I`Mb'c�L AND LETTERIN6 - I" VqHITE LETTERS NITH STANDARD kSORDINC7 PER HANDICAPPED REGUIREMENTS 2" DIAMETER STEEL P05T CENTERED ON H.O. STALL CONCRETE FOOTIN6 1:211 lon, RESERVED 1:211 BLUE BACK6ROUND NITH INHITE 5rM50L RESERVED AND LETTERIN6 I" NH17E LETTERS Y41TH STANDARD NORDIN& PER HAND I CAPPED CODE REOUIREMENT5 Tr V AWN ACCESSABLE 2" DIAMETER STEEL P05T CENTERED ON H.O. STALL CONCRETE FOOTIN6 PARKING SIGN LJ aH.C. 7 SCALE: 1/2" = 1'-0" &RID FOR LA**rOUT ONLY - NOT TO BE FAINTED FAINT 5'T'ME30L kNITI- 4" PNHITESTRIPE 'o, _4'-O" AT PARKIN6 HANDICAPPED VAN STALL 4 t 16 1 6 1 1 STAINED RIEDkNOOD OR CEDAR 5LAT5 FORK LOOK kNITH PADLOCK ErE METAL CAP TOP HIN& CHAIN LINK FABRIC STRECHER BAR 51/2" EXTRA 5TRONC7 5TV. 5TL. PIPE POSTS - CMU YiALL5 BE'rOND 7;W55 RODS OROP ROD A55MEBL'I'- kNITH FROUND KEEPERS F-40RIO BAND — MINPon, ,4 C,ATtE�, 9w--pWIS OXTe">6b IV RL,(, WIM TRASH ENCLOSURE GATE 5�,ALE: 1/4" = 1'-0" Parking Lot Entrance Only Sign Page I of 1 Home I Customer Comments I AboutUs I PrivacyPolicy Contactus I OrderPolicies I ShoppingCart IYOUR E-MAIL ISEARCH Home > 24" x I T1 king Lot Entrance Only Sign 9 24" x 18" Parking Lot Entrance Only Sign ADA Parking Item # 791 L FINI54ED ENTRANCE Assigned Parking Re,ular Price 111,74 & EA 0 Children At Play Sale price: $35.54 - you save $3.20 Church Parking I NLY Church Parking 2 Sheeting Engineer Custom Signs A -Graffiti Film No nti Customer Parking Employee of Month Availability Usually ships the next business day Fire Lane AN 2) Send thi� page to a friend Handicapped 1 Handicapped 2 Hospital Parking I Hospital Parking 2 Signs were excellent and delivered the next Hotel Parking \V - Carol, Coxsackie, NY No Loitering No Parking 1 No Parking 2 Lescription Sign haracteristics Reflective Sheeting No Parking 3 Zb No Skateboarding No Soliciting 241 x1i" 0, rking Lot ntrance Only Sign No Trespassing Parking Lot I Our "Carking d-L—trance nly" sign w I assist you in reducing confusion in your parkin Parking Lot 2 is sig �j MeasOring 24"xl this sig is availabl( with a choice of Engineer or High Intensity 3M Parking Lot 3 refle ive she All of ou signs havE rounded corners and mounting holes centered i Parking Permit Signs top a d bo IT) IIaUo_rL_Ea #Mer grade sheeting is appropriate for off-streE Pedestrian Crossing n Ily I, te ity sh uld be use( for all on street applications. Private Driveway Private Property W Reserved Parking .......... . ... School Signs 1 School Signs 2 RESUB Sign Posts Spanish Parking Signs JUL 12 2010 Tenant Parking 2u&RNQJE&AFTrMENT Traffic Cones MONM Traffic Signs Visitor Parking http://www.parkingsigncomer.com/entrance-only-7911.html Parking Lot Exit Only Sign Page I of 1 Home I Customer Comments I About Us I Privacy Policy I Contact Us I Order Policies I Shopping Cart IYOUR E-MAIL 7/12/2010 Home > 24" x IX-Rar king Lot Exit Only Sign FSEARCH (D 0 1 24" x 18" Parking Lot Exit Only Sign ADA Parking E''XIT Item # 787L Assigned Parking i Regular Price $38.74 Children At Play Sale price: $35.54 - you save $3.20 Church Parking 1 F ON,Ly 1 Church Parking 2 S eeting Engineer Custom Signs nti-Graffifiti Film No Customer Parking Employee of Month Availability Usually ships the next business day Fire Lane Handicapped 1 Send this page to a friend". Handicapped 2 Hospital Parking 1 Hospital Pa . rking 2 Good prompt service. Hotel Parking Robert, Jackson, AL No Loitering No Parking 1 No Parking 2 Description Sign C iaracteristics Reflective Sheeting No Parking 3 No Skateboarding No Soliciting No Trespassing 2411 x 10" Flarkinq Lot E it Only Sign Parking Lot I Ou "Parking ot E I it Only" i n clearly signates; exit lanes. Measuring 24"x18", this si, Parking Lot 2 t I SI ava able with a ch ice of Eni I ��ineer or Hii ' h Intensity 3M reflective sheeting. All of our si( Parking Lot 3 hav rounde n and m unting holE s centered at the top and bottom for easy insti rs Parking Permit Signs Engi eer grEL* eeting is a ropriate ft r off-street use. High Intensity should be used 3i Pedestrian Crossing on-leet W ca ions.. Private Driveway Private Property . ......... Reserved Parking School Signs 1 School Signs 2 Sign Posts Spanish Parking Signs Tenant Parking RESUB Traffic Cones Traffic Signs JUL 12 2010 Visitor Parking R—MENT P% RESU http://www.parkingsigneomer.com/exit-only-7871.html 7/12/2010 JUM 1179, 0j � Aff Cr RANDALLJ.MUNSON BUILDING DESIGNER 1930 6TH AVENUE SOUTH SUITE 301 SEATTLE WASHINGTON 98134 VOICE (206) 349-4551 FAX (866) 312-8468 COPYRIGHT NOTICE THIS PLAN IS ISSUED FOR CONSTRUCTION PURPOSES BY THE CLIENT INDICATED, REPRODUCTION OR USE OF THIS DOCUMENT WITHOUT THE B(PRESS WRI17EN CONSENT OF DESIGNER, RANDALL J. MUNSON, IS PROHIBITED. ARCHITECT MAINTAINS ALL RIGHTS UNDER STATE AND FEDERAL LAW, INCLUDING COPYRIGHT. CONTRACTOR NOTICE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ANY DIMEN- SIONAL ERRORS, OMISSIONS OR DISCREPANCIES BEFORE BEGIN- NING OR FABRICATING ANY WORK. DO NOT SCALE DRAWINGS. REVISIONS No. Date Item CITY OF '06.08.10 EDMONDS U) z 0 F— F— Z C/)0 111 Z 0 z C\I C:) z L0 Z Q0 C\I 00 0 05 WEL Z LLJ 0 Z 1.2- t- 0 (D Z C/) — r F— 0) < W W :5; LL - cy) U) N 0 C) C\I Z r-- 0 C\j 0 1­ co 2i —Lr) ce) (C,\)] LIj SITE DETAILS PROJECT NO. DESIGN RJM DRAWN RJIVI ISSUE DATE :06.08.10 A A-1 02 511f RESUB t- C3, MG 12 2010 ESUB SULDN cr-ly ICGFRFI�gr�S� JUL 12 2010 )010 - o0s �w w, 1467 151, -k Pot"o RM, is li REET FILE rm I E- 1 8470-90 U 0 JUN 1 2010 "'-WOF ONM TESC LEGEND CONSTRUCTION ENTRANCE— EXISTING ASPHALT DRIVEWAY TO BE USED. ONCE EXISTING ASHPALT IS REMOVED INSTALL QUARRY SPALL ACCESS PER STD DETAIL E1.2. CLEARING LIMITS FILTER FENCE (STD DETAIL E1.1) 0 INLET PROTECTION (STD DETAIL E1.3) INSTALL INLET PROTECTION UPON INSTALLATION OF NEW CATCHBASINS. NOTES: 1. THE LOCATION OF UNDERGROUND UTILITIES SHOWN HEREON IS APPROXIMATE ONLY. THE OWNER SHOULD CONTACT THE PURVEYORS OF ALL UTILITIES IN THE AREA TO DETERMINE THE LOCATION AND DEPTH OF ALL UTILITIES ON AND ADJACENT TO THE PROPERTY. CONTRACTOR TO VERIFY UTILITY LOCATIONS PRIOR TO CONSTRUCTION. IF ANY CONFLICTS ARE IDENTIFIED CONTACT ENGINEER IMMEDIATELY. 2. ADD11IONAL UTILITY EASEMENTS MAYBE REQUIRED DEPENDING ON EXISTING UTILITY LOCATIONS. 3. CONNECT ROOF AND YARD DRAIN TO DRAINAGE SYSTEM. 4. CALL ENGINEERING DIVISION (771-0220) FOR A INSPECTION BEFORE BACKFILLING AND FOR FINAL INSPECTIONS. 5. SEE SHEET A-1 FOR PARKING LOT LAYOUT, SIGNAGE AND STRIPING. GRADING QUANTITIES: TOTAL CUT = 250 C.Y. TOTAL FILL = 100 C.Y. THE QUANTITIES OF EXCAVATION AND FILL ARE APPROXIMATE, AND ARE SHOWN ONLY FOR THE PURPOSE OF OBTAINING A GRADING PERMIT AND SHALL NOT BE USED FOR- CONTRACTUAL PURPOSES. ELEVATION 288.40' (6 �011_ CD FH C-0, --INV 283.0 ......... R .. ......... ............... ..................... X; . .......................... ........................ 86) —/7 ............... ...................... M 8' 5�r FF SW 1/4 OF SECTION 25,,T.27N., R.H., W.M. 'kill LOT lb L Lo 011� Of Co 5' HIGH WOODEN 6 FENCE 1'9=20# SCALE 10 0 30 — — — — — — — — — — -- 4 5' HIGH -,=a\ am I WOODEN 1 0 20 FENCE ('99 G91 FOOTING ORA -,;DR L TRENCH (5 FT DEEP) DO NOT CON E�T OOFDRAIN SYSTEM. A N JE -(289), PIS 00- LOT 16 V.. 0 5' HIGH WOODEN C14 C6 FENCE 'QW,--"PAT1 CN '87.21 SDCO INV 283.40 DRIVEv' '1UT REPLAC 'EXSTING C RBX G R. & 28 S A LT Li<\ CB -TYPE 2 TE 284 * 88 CEIL G 2 5 7 .88 1 2 6 9. §8 CEN ER C N, 48" CMP SE k N ERRY TRAF�� X RIGHT LANE�\ '6 GNS \-OSITE BENCHMARK 'B' TOP N.E. BASE BOLT 226TH STREET S.W. OF LIGHT STANDARD N 88*36'54" W ELEVATION 285.76' ENTRANCE ELEVATION �AO05�- 287.24' W WV �OUND TACK IN \2" 1 * P ' IN 0 U�ENT IN E MS IMPERVIOUS AREAS BUILDING ADDITION, PATIO AND WALK = 1,509 SF EX. HOUSE = 1,441 SF DRIVEWAY = 5,500 SF TOTAL = 8,450 SF v1%.011,41 1 1 : IVIMF N.T.S. -BASIS OF BEARINGS WASHINGTON STATE PLANE GRID SYSTEM (NORTH ZONE) BENCH MARK NAVD 88 SET BENCH MARK, TOP OF MOST NORTHERLY LIGHT STANDARD BASE BOLT AT 11-iE SE CORNER OF SITE. SURVEY NOTES Vi 00" Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,MT,ND,0R,WA) LEGAL DESCRIPTION THAT PORTION OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., DESCRIBED AS FOLLOWS: BEGINNING THE NORTHEAST CORNER OF SAID NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER; THENCE NORTH 88*32'07" WEST 516.90 FEET TO THE NORTHEASTERLY LINE OF PAVED COUNTY ROAD; THENCE SOUTH 35*05' EAST ALONG SAID ROAD 614.9 FEET TO THE TRUE POINT OF BEGINNING; THENCE NORTH 50*55' EAST TO THE EAST LINE OF SAID NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER; THENCE SOUTH ALONG SAID EAST LINE TO AN INTERSECTION NTH THE NORTHEASTLERLY LINE OF SAID PAVED COUNTY ROAD; THENCE NORTHWESTERLY ALONG THE NORTHEASTERLY LINE OF SAID ROAD TO THE TRUE POINT OF BEGINNING. EXCEPT THAT PORTION THEREOF CONVEYED TO THE STATE OF WASHINGTON BY DEED RECORDED UNDER AUDITOR'S FILE NO. 2184263. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON, CONSTRUCTION SEQUENCE 1. ATTEND PRE -CONSTRUCTION MEETING. CALL ENGINEERING INSPECTOR (771-0220 EXT.1326) TO SET UP MEETING. 2. CALL FOR UTILITY LOCATIONS (1-800-424-5555). 3. CONTRACTOR TO REVIEW AND READ ESC NOTES AND PLAN. 4. FLAG CLEARING LIMITS. 5. INSTALL AND MAINTAIN CATCH BASIN PROTECTION (AS NEEDED) 6. CLEAR SITE PER THIS PLAN (DEMO, ROUGH GRADING). 7. CONTRACTOR TO ADHERE TO STABILIZATION OF EXPOSED AREA REQUIREMENTS AND MAINTAIN DUST CONTROL. 8. INSTALL UTILITIES (SEWER, STORM, WATER, POWER, ETC.). 9. FINAL GRADE/PAVE, MAINTAIN MINIMAL CB PROTECTION. 10. INSTALL FRONTAGE IMPROVEMENTS. CONSTRUCT NORTH ACCESS FIRST TO PROVIDED SITE ACCESS PRIOR TO REMOVING SOUTH ACCESS POINT. 11. HYDROSEED AND MULCH ALL EXPOSED AREAS. 12. REMOVE ESC DEVICES ONCE PERMANENT SITE STABILIZATION MEASURES ARE INSTALLED. APPROVAL BY CITY REQUIRED, PRIOR TO REMOVAL OF ESC DEVICES. APPLICANTZOWNER ZONING: GROW WITH US LEARNING CENTERS BP- COMMERCIAL PLANNED BUSINESS CONTACT: SCOTT ANDERSON 23632 HWY 99 SUITE F PMB#502 LOTAREA EDMONDS, WA 98026 12,824 SF (0.2944 AC.) TELEPHONE: (425) 772-2975 TAX PARCEL 270325 003 080 00 SITE ADDRESS WATER PURVYOR 665 EDMONDS WAY OLYMPIC VIEW WATER & SEWER DISTRICT EDMONDS, WA 98020 SEWER PURVYOR CITY OF EDMONDS DESIGNER ENGINEER /SURVEYOR RANDALL J. MUNSON LOVELL- SAU ERLAN D & ASSOCIATES, INC. 1930 6th AVE S 19217 36TH AVENUE W., SUITE 106 SUITE 301 LYNNWOOD, WA 98036 SEATTLE, WA 98134 TELEPHONE: (425) 775-1591 TELEPHONE: (206) 349-4551 CONTACT- ROBERT LONG "'T RESUB IS FILE juN i, L mm Lovell — Sauerland & Associates, Inc. Engineers/Surveyors/Planners Development Consultants 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e—mail: info@lsaengineering.com web: lsaengineering.com I C� co 0 �02 z LLI Ld cr_ U) 0 M Ld IL UJI V) Of U2 z 0 of z In 0 n Z: CIC L'j 0 LLj :2 1 1 ...j n 0 U) I Lli Ld 0 Ld V) �t Q) 4/200 1 Lj 0 I- C/) C/) < 0 C-� > LJJ Ld I , 0 0 N 0 C/) Li 0 0 z C/) APPROVED FOR CONSTRUCTION JUN 0 2 2010 CITY OF EDMONDS SCALE 1 ff =20' IDATE- DRAWN CHECKED RLL RLL SHEET BY: DATE F.B. CITY ENGINEERING DIVISION 3-23-10 CrrY M NO. H! 8 U B c) o 9-4 6 AUG 3 0 2010 LSA M NO 5221 oF3 =I hm! 11 A -M GENERAL NOTES 1. ALL CONSTRUCTION SHALL CONFORM TO W.S.D.O.T. 2010 STANDARD SPECIFICATIONS FOR ROAD, BRIDGE & MUNICIPAL CONSTRUCTION AND STANDARD PLANS AS ADOPTED BY THE CITY OF EDMONDS, AND ANY REQUIREMENTS ESTABLISHED AT CITY HEARINGS ON THIS PLAN (W.S.D.O.T. 2010). 2. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTION BY THE CITY OF EDMONDS AND THE CONTRACTOR SHALL NOTIFY THE CITY OF THEIR SCHEDULE IN SUFFICIENT TIME TO PERMIT INSPECTION PRIOR TO AND DURING THE WORK. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF SIDE SEWERS (LATERALS & TEES) AND THE PLACING OF 2 X 4 MARKERS WITH THE LENGTH AND DEPTH OF THE LATERALS AND TEES INSCRIBED ON THE MARKERS, AND PRIOR TO BACKFILLING. 4.' THE CONTRACTOR SHALL CALL THE ENGINEERING DIVISION (425-771-0220, EXT 1326) 24 HOURS IN ADVANCE FOR ALL INSPECTIONS OF THE SIDE SEWERS AND WATER SERVICES. 5. UPON COMPLETION OF THE SITE IMPROVEMENTS AND UNDERGROUND UTILITIES, THE CONTRACTOR THROUGH HIS CONSULTING ENGINEER SHALL FURNISH AN AS -BUILT PLAN TO THE CITY OF EDMONDS WHICH INDICATED THE LOCATION OF ALL SITE IMPROVEMENTS INCLUDING SIDE SEWER LATERALS OR TEES, WATER LINES OR OTHER PERTINENT INFORMATION. 6. UNDERGROUND WIRING REQUIRED WITH STREET LIGHTING (PRIVATE). 7. WATER SERVICE WITH METER BOX AND CURB STOP REQUIRED FOR EACH LOT. 8. THE CONTRACTOR SHALL ARRANGE FOR AND MAKE AIR TESTS OF SANITARY SEWER AND SEWER CONNECTIONS UNDER THE SUPERVISION OF THE CITY ENGINEER OR HIS DESIGNATED REPRESENTATIVE. LATERALS TO BE 6" CONCRETE PIPE, OR P.V.C. CONFORMING TO SDR Z,&34 jW STANDARDS. 9. EXISTING UNDERGROUND FACILITIES HAVE BEEN SHOWN ON THIS DRAWING FOR THE PURPOSE OF ASSISTING THE CONTRACTOR IN LOCATING SAID FACILITIES IN THE FIELD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ACTUAL LOCATIONS IN THE FIELD AND CHECKING WITH APPROPRIATE AGENCIES THAT MAY HAVE UNDERGROUND FACILITIES WITHIN THE PROJECT LIMITS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO UNDERGROUND FACILITIES RESULTING FROM HIS OPERATIONS. 10. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN, FLUSH, DISINFECT WHERE APPLICABLE AND OBTAIN SATISFACTORY APPROVAL FROM THE CITY OF EDMONDS REGARDING THE QUALITY AND INTEGRITY OF EXISTING WATER LINES, SANITARY SEWER LINE, STORM LINE, RETENTION SYSTEM, ETC. WRITTEN ACCEPTANCE BY THE CITY OF THESE PROCEDURES MUST BE TRANSMITTED TO THE DESIGN ENGINEER. 'Loto 12. ALL WORK AND rrERIALS SHALL BE IN ACCORDANCE WITH A.P., W.S.D.O.T. 2eO A.P.W.A. STANDARD SPECIFICATIONS OR AS DIRECTED BY THE CITY O� EDMONDS. 13. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXACT LOCATIONS TO AVOID DAMAGE OR DISTURBANCE. 14. ALL INLET AND CATCH BASIN FRAME AND GRATES SHALL NOT BE ADJUSTED UNTIL IMMEDIATELY PRIOR TO PAVING. 15. THE TEMPORARY EROSION/SEDIMENTATION CONTROL FACILITY SHALL BE CONSTRUCTED PRIOR TO ANY GRADING OR EXTENSIVE LAND CLEARING IN ACCORDANCE NTH THE APPROVED TEMPORARY EROSION /SEDI MEN TATION CONTROL PLAN. THESE FACILITIES MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR IN SITE EROSION HAS PASSED. 16. ALL REQUIRED STORM WATER RETENTION /DETENTION FACILITIES MUST BE'CONSTRUCTED AND IN OPERATION PRIOR TO ANY PAVING UNLESS OTHERWISE APPROVED BY THE ENGINEERING DIVISION. 17. ALL DRAINAGE STRUCTURES SHALL HAVE LOCKING LIDS, REGARDLESS OF LOCATION. 18. ALL DISTURBED SURFACES SHALL BE SEEDED WITH TOUGH, HARDY, FAST GROWING GRASS UNLESS LANDSCAPING/EROSION CONTROL MEASURES ARE EMPLOYED. 19. UNLESS OTHERWISE NOTED ALL STORM DRAINAGE PIPING 8', 12", 18'. 24" & 36" INCLUDING DETENTION PIPE WILL BE 16 GAUGE GALVANIZED STEEL AND SHALL USE TREATMENT 1. 20. GRASS SEEDING WILL BE DONE USING AN APPROVED TYPE HYDRO - SEEDER, OR AS OTHERWISE APPROVED BY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS. THE PERFORMANCE BOND WILL NOT BE RELEASED UNTIL THE GRASS IS ESTABLISHED UNLESS OTHERWISE APPROVED BY THE CITY OF EDMONDS DEPARTMENT OF PUBLIC WORKS. 21. PIPING SPECIFICATIONS AS NOTED. 22. ALL STEEL PARTS WILL BE GALVANIZED AND WITH TREATMENT #1 (ASPHALT COATED). 23. ALL WORK AND MATERIALS FOR INSTALLATION AND CONSTRUCTION OF SEWER, WATER, AND UNDERGROUND POWER SHALL CONFORM TO STANDARD SPECIFICATIONS FOR SUCH WORK IN ACCORDANCE WITH THE CITY OF EDMONDS AND SNOHOMISH COUNTY P.U.D. STANDARDS. OPW III& S5STI 2A.'T. W R.V , 1. M. SW 1/4 SECT 2 k. WORK PRIOR TO POUR 5-1/2' V R 7- 1' BATTER 4 . 4 1'R A 0.05 FT/FT 4 4 4 'A A' - 'A 6' A A. 4 4 - - - - - - - - - - - - - - - - - - - - - - 18' STANDARD 24' ARTERIAL NOTES, 1. FORMS SHALL BE TRUE TO LINE AND GRADE AND SECURELY STAKED, 2. EXPANSION JOINTS SHALL BE PLACED ADJACENT TO CATCH BASINS, 3. EXPANSION JOINTS SHALL BE EVERY 10 FEET AND DUMMY (CONSTRUCTION) JOINTS EVERY 5 FEET. 4. EXPANSION JOINTS SHALL HAVE 1/2' TO 5/8' WIDE PREMOLDED JOINT FILLER. 5, CONCRETE SHALL BE CLASS 3- 300OPSI, 6. FINISH SHALL BE LIGHT BROOM, 7. CURB SHALL BE SPRAYED WITH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS, 8. ALL SIDEWALKS POURED BEHIND CURB IN DRIVEWAY AREAS SHALL BE 6' THICK OVER 2' OF CSTC WITH SUBGRADE COMPACTED TO 95% MAXIMUM DENSITY. k�st. 189k) 5/8' MINUS CSTC E.-D NA O.N. D - S....' REVISIONS APPROVED BY I DATE STANDARD DETAIL D, GEBERT 4/27/05 STANDARD TYPE "A" CURB/GUTTER DETAIL D. GEBERT 4/2/07 DATE 7/24/01 1 SCALE NTS I DWG NO. E2.8 STANDARD TYPE 'A' URB/GUTTER DETAIL (E VC 2.8) 2' MIN SAW CUT \2' CLASS 'B' ACP TACK CONC. SURFACE 4' -5/8' MINUS CSTC - 2'- 5/8' MINUS CSTC NOTE: PAVEMENT COMPACTION- 91% RICE DENSITY SUBGRADE AND TOP COURSE COMPACTION - 95Y (ASTM155' CITY INSPECTION REQUIRED ON ALL EROSION CONTROL MEASURES BEFORE WORK CAN BEGIN, CLIRB/GLITTER FORMS AND SUBGRADE INSPECTION REQUIRED PRIOR TO POURING AND BEFORE APPLYING ACP E.-D.- M' 0 ND -S REVISIONS APPROVED BY DATE STANDARD DETAIL D. GEBERT 4/27/05 ASPHALT WALKWAY D. GEBERT 04/2/07 DATE SCALE DWG No' E2.12 rzs. 7/24/01 1 NTS I FRAME & 3/4" TO 1-1/2" GRATE WASHED ROCK 6" FROM BUILDING -A C - - ------------ - - - - - - - --- - - - - - - - - - - - - - - - - - --- OIL/WATER SEPARATOR 70' TEE, SEE DETAIL A Q A . 1. I Z M1 284.00 281.00 PROFILE WRAP SIDES & TOP WITH FILTER FABRIC TYPAR 3401, AMOCO 4545 OR APPROVED EQUAL 6" PERFORATED PVC PIPE WASHEDROCK 3/4" - 1-1/2" SECTION A -A INFILTRA71ON TRENCH DETAIL 6'(W) x 89(L) x 3.0'(D) 20' MIN WIDTH 2% (VARIES) 2% (VARIES 8!3'-6" PVC PERFORATED PIPE @ 0.00% 6 " PVC REMOVABLE PLUG 1"VENT HOLE co 6" PVC FACTORY TEE 6" FROM BUILDING TYPE 1-L CB 282.50 PERFORATED PIPE 6" PVC PIPE Z GROUT N"'�6" PVC PIPE OIL/WATER SEPARATOR TEE LL-2" MIN. COMP'T. DEPTH HMA PAVEMENT CLASS 1/2" 2" MIN. COMP'T. DEPTH AGG. LEVELING COURSE 4" MIN. COMP'T. DEPTH AGG. BASE COURSE DRIVEWAY SEC11ON LL APPROVED SUBGRADE NO SCALE L INSTALL Lovell - Sauerland MATERIALI/2 PIXCPANSION JOINT CURB AT 1-12 X & Associates, Inc. Engineers/Surveyors/Planners Development Consultants �ol RAM AT 1,12 19217 36th Avenue W. EXISTING SIDEWALK E3 Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 L 3� LANDING SAW CUT AS REQUIRED T PICAL 13N ACTILE WARNING STRIP SEE DETAIL A e-mail: info@lsaengineering.com ALL RAMPS I' TYP. V WIDE (TYPICAL) web: Isaengineering.com LTAA\\,- 1/2, /4' N13MINAL DIMENSIONS TRACTION GRID PATTERN TACTILE WARNING TEXTURING DETAIL A NOTEi 1. AT LOCATIONS WHERE NEW RAMPS ABUT EXISTING CURB, GUTTERS, PLANTER STRIPSo AND SIDEWALKS, CONSTRUCT NEW RAMPS TO MATCH ADJACENT SURFACES, 2. ALL CONCRETE SURFACES SHALL HAVE A LIGHT BROOM FINISH. 3. CONCRETE SHALL BE SPRAYED WITH A CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS. 4. DETECTABLE WARNING PATTERNS (TRUNCATED DOMES) SHALL BE REQUIRED ON ALL PUBLIC STREETS WITH A CURB RETURN AND PRIVATE STREETS SERVING FIVE OR MORE LOTS. TRACTION GRID (DIAMONDS> TO BE USED AS INDICATED. 5. FOR NON -INTERSECTION CURB RAMPS ON PRIVATE PROPERTY, THE STANDARD DIAMOND PATTERN MAY BE USED AS INDICATED IN TIFTATI A. CITY INSPECTION REQUIRED ON FDRM WL7RK PRIOR TO POUR. ACCESSIBLE RAMP SHALL BE POURED SEPARATELY FROM CURB AND GUTTER, 1090- 1 99V RADIUS VARIES TYPE 2 CURB RAMP 5' LONG RAMP MIN (SEE DETAIL E-2.15� SIDEWALK �OT rA I ---) MONO -S....: 'I"T Y 0 F.- REVISIONS APPROVED BY _DATE STANDARD DETAIL D. GEBERT 03/24/05 CURB RAMP TYPE 2 D. GEBERT 06/27/05 DATE 7/24/01 SCALE - NTS DWG NO. E2.15 D. GEBERT 04/2/07 1 1 Im PLACE F WIDE TACTILE V EEHIND START OF RAMP ACP ACP CU Est. 189Q Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,Wr,ND,0R,WA) CONCRETE CURB AND GUTTER OR 16' VERTICAL CURB (TO MATCH VARIES PER EXISTING CURBING) SHALL EXTEND TO END OF RADIUS, CODE EXTRUDED CURB SHALL START AT END OF RADIUS >- I TRANSITION SLOPE SHALL I BE 1112 (TYP) > TYPE 2 CURB RAMP z 5' LONG RAMP MIN, Q� P (SEE DETAIL E-2.15> a. U CONCRETE CURB AND GUTTER ZFPLACE FULL DEPTH EXPANSION JOINT I BETWEEN C/G AND HIGH TRAFFIC LOAD GUTTER, IF WING AND C/G ARE NOT POURED AS ONE UNIT CURB/GUTTER AND WING FOR HIGH TRAFFIC LOAD GUTTER MAY BE POURED AS ONE UNIT. FULL DEPTH EXPANSION JOINTS SHALL BE PLACED IF WIDTH OF OPENING EXCEEDS 15', REVISIONS APPROVED BY DATE STANDARD DETAIL D. GEBERT 10/6/03 MULTI-FAMILY1 COMMERCIAL HIGH TRAFFIC LOAD DRIVEWAY ACCESS D. GEBERT 04/2/07 (WITH APHALT DRIVEWAY APPROACH) DATE 7/24/01 1 SCALE NTS IDWG NO. E2.27 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: -1 hdm 10 BY- mr-mnett CITY ENGINEERING DIVISION C14 P-1 (0 I 1.2 z W 0 LIJ 5: W 0 iy- W IL W U) z < V) LLJ 0 0 Ld n Z) 0 1 LIJ > Ld Ld V) Wzho 0 LLJ I— 0 ry Cn V) Z r) �7 < 3: 0 > Lli z Ld I , 0 D 0 CN C) 0 F- 0 V) C) :2 Ld 0 (f) 0 C'0 V) JON 0 2 2010 SCALE AS SHOWN DRAWN CHECKED RLL RLL 1 1 SHEET 2 DATE 3-23-10 F.B. - Crff M NO. oF3 LSA M NO. 5221 SW 1/4 OF SECTION 25, T.27N., R.H., W.M. 1rQ EROSION AND SEDIMENT CONTROL (ESC) N000 1. ESC MINIMUM REQUIREMENT — CONSTRUCTION ACCESS ROUTE CONSTRUCTION VEHICLE: ACCESS SHALL BE, WHENEVER PRACTICAL, LIMITED TO ONE ROUTE. ACCESS FILTER FABRIC POINTS SHALL BE STABILIZED WITH QUARRY SPALLS OR CRUSHED ROCK TO MINIMIZE THE SECURED TO % X 2' TRACKING OF SEDIMENT ONTO PUBLIC ROADS. IF SEDIMENT IS TRANSPORTED ONTO A 14 GA. WIRE F BRIC ROAD SURFACE, THE ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWEEPING AND BE EQUAL TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA WITHIN 24 HOURS. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 2' X 2' WOOD OR 1 91 2. ESC MINIMUM REQUIREMENT — STABILIZATION OF EXPOSED AREAS: EQUIVALENT ALL SOILS EXPOSED BY LAND DISTURBING ACTIM11ES SHALL BE STABILIZED BY SUITABLE cu APPLICATION OF BMPS, INCLUDING, BUT NOT LIMITED TO, SOD, HYDROSEEDING, OR OTHER VEGETATION, PLASTIC COVERING, OR MULCHING. ALL BMPS SHALL BE SELECTED, DESIGNED, AND MAINTAINED IN ACCORDANCE WITH THE MANUAL. THE EXPOSED SOILS SHALL BE STABILIZED ACCORDING TO AN APPROVED TIMETABLE. (TYPICALLY, NO SOILS SHALL REMAIN EXPOSED FOR MORE THAN TWO DAYS FROM OCTOBER 1 THROUGH APRIL 30 AND NO MORE THAN SEVEN DAYS FROM MAY 1 THROUGH SEPTEMBER 30). 8'— 12' — PROTECTION OF ADJACENT PROPERTIES: 3. ESC MINIMUM REQUIREMENT ADJACENT PROPERTIES SHALL BE PROTECTED FROM SEDIMENT DEPOS111ON BY APPROPRIATE USE OF VEGETATIVE BUFFER STRIPS, SEDIMENT BARRIERS OR FILTERS, DIKES OR MULCHING, OR BY A COMBINATION OF THESE MEASURES AND OTHER APPROPRIATE U BMPS. 4. ESC MINIMUM REQUIREMENT — MAINTENANCE: 8# ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE OWNER TO ENSURE CONTINUED PERFORMANCE OF THEIR INTENDED PLACE 3/4'-1.5' WASHED GRAVEL IN FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE CONDUCTED IN ACCORDANCE V41TH THE TRENCH AND ON BOTH SIDES OF THE MANUAL. FILTER FABRIC FENCE ON THE SURFACE. 5. ESC MINIMUM REQUIREMENT — OTHER BMPS: AS REQUIRED BY THE CITY, OTHER APPROPRIATE BMP'S TO MITIGATE THE EFFECTS INCREASED RUNOFF SHALL BE APPLIED. 6. ESC MINIMUM REQUIREMENT — UNDERGROUND UTILITY CONSTRUCTION: THE CONSTRUCTION OF UNDERGROUND UTILITY LINES SHALL SPECIFICALLY ADDRESS THE FOLLOWING: A. EROSION CONTROL FOR EXCAVATED STOCKPILED MATERIALS; B. THE PLACEMENT OF EXCAVATED MATERIAL WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES; C. TRENCH DEWATERING SYSTEMS (MUST DISCHARGE INTO SEDIMENT TRAPS, SEDIMENT PONDS, OR OTHER ACCEPTABLE MEANS); D. TRACKING AND SPILLING OF MATERIALS ON STREETS DUE TO HAULING; E. DAILY CLEANUP AND STREET MAINTENANCE. CONTRACTOR/DEV ELOPER SHALL MAINTAIN AND REPLACE STRAW BALES TO INSURE PROPER EROSION CONTROL, 1090-199V FILTER FABRIC MATERIAL IN CONTINUOUS ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE, WIRE MESH SUPPORT F TO SUPPORT FILTER F BU Y BOTTOM OF FILTER MATERIAL 8' TO 12' 6' MAX. 2' X 2' WOOD POSTS OR EQUIVALENT CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN, C.I.-TY M*:O' REVISIONS STANDARD DETAIL APPROVED BY DATE FILTER FABRIC FENCE FILTRATION SYSTEMS DATE 7/24/01 1 SCALE NTS I DWG No' E1.1 61 MIN. RADIUS QUARRY SPAILLS 2-4' MIN DIA 8'-12' MIN, DEPTH PROVIDE FULL WIDTH OF INGRESS/ EGRESS AREA CONTRACTOR SHALL MAINTAIN TEMPORARY CONSTRUCTION ENTRANCE DURING THE CENSTRUCTION PERIOD, ICITY INSPECTION REQUIRED ON ALL EROSION CONTROI MEASURES BEFORE WORK CAN BEGIN. Id90-1991i REVISIONS APPROVED BY I DATE STANDARD DETAIL 1). GEBERT 10/6/03 STABILIZED CONSTRUCTION ENTRANCE — DATE 7/24/01 1 SCALE NTS I DWG NO. E1.2 4 A 4 2 4: GRATE CB FILTER SOCK WITH I OVER FLOW HOLES I I CATCH BASIN I STRAW BALES MAY BE USED IN CERTAIN CIRCUMSTANCES (SEE DETAIL E111), THIS APPLICAITON SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCITON PERIOD, CITY INSPECTION REQUIRED ON ALL EROSION CONTROLI MEASURES BEFORE WORK CAN BEGIN. C J-7 Y REVISIONS STANDARD DETAIL APPROVED BY -DATE D. GEBERT 10/06/03 D. GEBERT 05/19/05 TEMPORARY SEDIMENT TRAP FOR CATCH BASINS 168 9 0 — k19 C3 0 D. GEBERT 05/05/06 DATE SCALE DWG NO. 7/24/01 NTS E1.3 Call 2 Working Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,Wr,ND,0R,WA) APPROVED FOR CONSTRUCTION CITY OF EDMONDS DAIE: - -11WIfOld BY- mtM13fil CITY ENGINEERING DIVISION LEmanq � iimiiiiiiiiiiiiiii em M M Lovell— Sauerland & Associates, Inc. Engineers/Surveyors/Planners Development Consultants 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e—mail: info@lsaengineering.com web: Isaengineering.com 0 �zl_ Cq P-1 co 0 _71 of 9 z Ld 0 Ld Of F- V) V) W (L Ld W Of V3 Or: V) Ld r') 0 �7 < Z� V) Lij 0 ry. 0 Ld LLJ cr) :2i n 0 1 Ld > Ld Ln (000 Lij 0 I— 0 z ry D:: V) V) 0 :2 > M Lj In 0 0 N 0 Z 0 C/) 0 :2 Ld 0 V) 0 V) V) N 0 2 2010 SCAIE AS SHOWN DRAWN CHECKED DATE RLL F.B. RLL SHEET 3-23-10 3 CITY FRE NO. LSA M NO - 5221 1 oF3 -1 0 \41 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- SW 1/4 OF SECTICN 25, T.27N., R.H., W.M. Y\\\ C C B A VICINITY MAP N.T.S. SCALE 1"=100' 50 0 150 Ism". '"I 0 100 TRAFFIC CONTROL PLAN NOTES 1. AFTER WORK WITHIN THE TRAVELED ROADWAY IS COMPLETED AT THE END OF EACH DAY, THE ROAD SHALL BE COMPLETELY OPEN TO TRAFFIC AND ALL EQUIPMENT SHALL BE OUT OF THE TRAVELED ROADWAY. ANY EQUIPMENT OR CONSTRUCTION MATERIALS LEFT WITHIN THE PUBLIC RIGHT-OF-WAY SHALL HAVE LIGHTED TYPE 11 BARRICADES AROUND THEM. ALL NONAPPLICABLE SIGNS SHALL BE REMOVED, TURNED OR COVERED DAILY W11EN CONbITION NO LONGER EXISTS. Af&jP& ft�WT W ,fM ( 4W gome Igor M 2. ACCESS B Y EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES. WMA IM f-Al 3. CONSTRUCTION SIGNS AND DELINEATORS SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR. 4. TRAFFIC CONTROL PLAN IS SUBJECT TO CHANGE PRIOR TO CONSTRUCTION. 5. ADDITIONAL SIGNING AND FLAGGING MAY BE REQUIRED AS CONDITIONS WARRANT. , 6. SHOULD A PROPOSED SIGN LOCATION FALL WITHIN A PRIVATE DRIVEWAY, CONTRACTOR TO ADJUST LOCATION OF SIGN TO FALL 5'+ BEYOND EDGE OF DRIVEWAY IN DIRECTION OF ROAD TRAFFIC. (10' MAX. FROM PLAN LOCATION) DRIVEWAY ACCESS SHALL BE MAINTAINED AT ALL TIMES. 7. ALL TRAFFIC CONTROL SHALL COMPLY WITH MUTCD STANDARDS (I.E. FIGURE 6-5). 8. ENTIRE CLOSURES OF EDMONDS WAY WILL NOT BE PERMITTED, ONLY ONE LANE MAY BE CLOSED AT A TIME. 9. CLOSURE OF THE SIDEWALK AND PARKING AREAS FOR MORE THAN 72 HOURS WILL REQUIRE PAYMENT OF DISRUPTION FEES. LTR. MUTCD SIGN TYPE A W20-1 ROAD WORK AHEAD B I W9-2 LANE ENDS MERGE LEFT C R3-7 (RIGHT) RIGHT LANE MUST TURN RIGHT D G20-2 END ROAD WORK NOTE: ALL CONSTRUCTION SIGNS AND FLAGGERS ARE TO BE PROVIDED BY CONTRACTOR. ONE LANE CLOSURE- SIGNAGE SCHEDULE Call 2 Worldng Days Before You Dig 1-800-424-5555 Utilities Underground Location Center (ID,WT,ND,OR,WA) APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE- -11 vp. [at 0 BY- MEM" CITY ENGINEERING DIVISION L EM EMMM Em 0 M Lovell— Sauerlaiad & Associates, Lac. Engineers/Surveyors/Planners Development Consultants 19217 36th Avenue W. Suite 106 Lynnwood, WA 98036 phone: (425)775-1591 e—mail: info@lsaengineering.com web: Isaengineering.com 0 'C' N 0 �2 z W 0 W 15 W U) Cn 0 W Ld U) Of W 0—f z n _j 0 ry I— z 0 0 Q� 0 11 0 LIL_ 11 < ry 11 11 Lij V) 0 r) Ld 0 rel I— C) LLJ V) (P/Z/10 z 0 (ID V) D 0 0 V) 0 0 z V) 02 2010 SCALE 1 of = 100' DRAWN CHECKED DATE RLL F.B. RLL SHEET 3-23-10 - TC1 CITY FILE NO. LSA FILE NO 5221 OF TREE 5TAIQ`5 TO PARALELL, EVEN- UN50ARRED AND UNDISTURBED SUE • FERTILIZE ALL TF APPROVED STAR APPLIED AT MAN[ 5U65,6175TED RATE • PLANT TREE I" HI( THAN DEPTH 6RC NUR5ER"r. (5U"rlN(5 APARATU 1/2" REINFOROED 12 &A 6ALV. NIRI :2x2 r;)CU&LA5 Flf 2" DEPTH BARK � 4" NATERIN& 5AE 5URROUNDIN& TRI FINISHED &RADE FULL BURLAP OFf OF ROOTBALL PLANTIN& MIX 5/4 SEE 6ENTERAL NO SCARIF'r PLANT11", EX15TIN6 SUBORA SET ROOTBALL C OF COMPACTED BACKFILL MIX REE PLANTING DETAIL 50ALE: I" = 1'-0" "050 2" DEPTH BARI< MULCH 4" NATERIN& BA51N- 5URROUNDINry PLANT REMOVE BURLAP FROM TOP 1/5 OF ROOTBALL. L16HTLr' 5CARIF�r ROOTBALL OF CONTAINER-6RONN PLANTS. PRIOR TO BACKFILLIN& EX15TIN& 5U5&RADT=-----' PLANTIN6 5AOI<FILL MIX. SEE 6ENERAL NOTE5 50ARIF'yl PLANTIN& PIT NALI SET ROOTBALL ON MOUND — OF COMPACTED PLANTIN& BACKFILL MIX SHRUB DETAIL SCALE = PLANT SCHEDULE SYMBOL + n. BOTANICAL NAME F&L 0 PLANT SHRUB I" H16HER 1000 THAN DEPTH rvRONN AT NURSERY. o FERTILIZE ALL PLANTS PNITH APPROVED STARTER FERTILIZER 2 TIMES APPLIED. AT MANUFACTURER'S ROOTBALL DIA.'I 5U(5C7E5TEP RATES ACER C, I RO I NATUM FRAXINU5 0X'T'CARFA allER01,15 FALUSTRI5 BERE3,ERIS VERRUOUL05A RH0L;)01:;)F_Nr�R0N 'UNIOUE \/IE3URNUM DAVIDDI RH0r;'0r;)F_NDR0N 'PURPLE 5LEND' AT51,16A HETEROPHYLLA A 2 0ER0I1;)IFHYLLUM JAPONIOUM COMMON NAME VINE MAPLE RA"rE3URN A5H FIN OAI< kNARTY 5ARBBERR"r' UNIOUE RH0L';)01�)Er;)R0N DAVII�)'5 VIBURNUM AZALEA NF5TFRN HEML0r_.f< KAT51,IRA RJM052 SIZE a 1-011-101-011 2 11 oAL. 2 1/2 11 cAL. 1511 - Iall 4 " P075 A7 15 " 0. r-,. 51-011 - 101-011 511 cAL. 05 N TE 256.54 Nm A v 2 \,X LAION''DSCAPE IL m Fff" L A I& k ml SCALE: I" = 10'-0" E31 171 0 A 'K A 13 0 &'HI(SH INOOD�N r-r=Nrr= ALONO FROPERTr LINE5 15, e- 0, xx - VING A 13 Sy PLAt 26" CON tu D 13 13 + 1 0 N r 13 Pf 2 CON RESUB 3 0 2010 loll c .............. ................. * ......... ................................... ....... ....................................... X. ......... ... .. .. ......... .... . ............... - sw .................... .................. ............. ............ RANDALL J. MUNSON BUILDING DESIGNER 1930 6TH AVENUE SOUTH SUITE 301 SEATTLE WASHINGTON 98134 VOICE (206) 349-4551 FAX (866) 312-8468 COPYRIGHT NOTICE THIS PLAN IS ISSUED FOR CONSTRUCTION PURPOSES BY THE CLIENT INDICATED. REPRODUCTION OR USE OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN CONSENT OF DESIGNER, RANDALL J. MUNSON, IS PROHIBITED. ARCHITECT MAINTAINS ALL RIGHTS UNDER STATE AND FEDERAL LAW, INCLUDING COPYRIGHT. CONTRACTOR NOTICE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE AND NOTIFY THE ARCHITECT OF ANY DIMEN- SIONAL ERRORS, OMISSIONS OR DISCREPANCIES BEFORE BEGIN- NING OR FABRICATING ANY WORK. 00 NOT SCALE DRAWINGS. REVISIONS No. Date Item CITY OF 06.08.10 EDMONDS A:2 CITY OF 07.23.10 EDMONDS m 0 0 U) w z w 0 F- Z W Z 04 c LO U) Z M (0 04 0 (L cc) Lj— 1 0) < EL Z u� III - W 0 F_ F— z 5 Q 0 z 0 0) w >iU- 0 c� Z 0 C'q 0 00 2 (0 0 c\I cf) cq ui 119-t LANDSCAPE PLAN and DETAILS PROJECT NO. DESIGN RJM DRAWN RJM ISSUE DATE 04.02.10 AUG 12 2010 IRRUM�UN E� P/1,F h �j