Loading...
6819 174TH ST SW.PDFiiiiiiii lill 1034 6819 174TH ST SW Permit No:20,00-02kO City of Edmonds RIGHT-OF-WAY.,.C,,,,,ONSTRUCT.10N PERMIT Issue Date: A. Address or Vicinity of Construction: 6819 174 ST. PERMISSION REQUEST TO INSTALL A 2" PLASTIC MAIN TIE IN FROM ±9'N C/L B. Type of Work (be specific): OF 174 ST SW & t319'W C/L of 68 AV W, CONTINUE WEST TO THE iND OF MAIN t374"W C/L'and ±12'N C/L WITH 2 CUTS INPAVING ANTICIPATED. PER JOB #107008956 C. Contractor: PUGET SOUND ENERGY MailingAddress: 1122 75th ST SW..�,VVC—z ` I State License #: D. Building Permit # (if applicable): — Contact: DOUG USITALO Phone: 425-356-7520 �riability Insurance:— Bond:$ Side Sewer Permit # (if applicable): E. Commercial §ubdivision 0, City Project [] EUC (PUD, GTE, PSE, CHAMBERS, OVWD) Multi -Family Single Family INSPE&OR- F. PAVEMENT: E] YES 0 1 )NO,: ) G. SIZE OF CUT 2 �X 4 H. Charge: CONCRETE CUT: YES �E] NO . . . . ......................... APPLICANT TO READ AND SIGN IDEMNITY. Applicant understands by hislher signature to this application helshe holds the City of Edmonds harmlessftom injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that -may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR, WORKMANSHIP AND MATERIALS FOR A PERIOD1OF'!ONE1 YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WOkk'!�STI_MAtED-RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, ATWHICHTIMEA DEBITOR CREDIT WILLBEPROCESSED FORISSUANCE TO THEAPPLICANT. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the re quired training in their possession. # Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -.- approved material prior to the end of the workday — NO EXCEPTIONS. + Three sets of construction drawings of proposed work are required with the permit application. IHAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMIT REQUIREMENTS AND ACKNOWLEDGE 47-HA T I MUST MAKE THE PINK COPY OF THE PERMIT A VAILABLE ON SITE A T ALL TIMES FOR INSPECTIONS _4 11 - 06/01/2000 (Contractor or Agent) CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK JSE ONLY Right-of-way Fee: Disruption Fee/Fund I I J: Restoration Fee: Total Fee: ­75 --Receipt No: UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE. FINAL APPROVAL OF PERMITTED WORK. PEC 7VA TURE DATE: For inspection requirements see Engineering Information Handout. NO WORK SIIALL BEGIN PRIOR TO PE.RMITISSIJANCE I P Le Date: To: From: Subject: MEMORANDUM June 9, 2000 PSE — 174th St Maryanne Zukowski Traffic Engineer Right of Way Permit traffic control conditions of approval Traffic Control in the City Right-of-Wa All signs, baff icades and related equipment and their use must be in accordance with Part IV, "Traffic Controls for Highway Construction and Maintenance Operations," of the Manual on Uniform Traffic Control Devices, as prepared by the National Joint Committee on Uniform Traffic Control Devices and per the City of Edmonds Developmental Standards. Reasonable accommodations shall be made for distance requirements in signage for geometrical conflicts. Note the additionalflaggers may be neededforproblems with sight distance in the area, hill and curve. Coordination with the City Inspector prior to all work. Particular attention should be made to the following items: There shall be at all times reasonable pedestrian and vehicular access to and egress from the properties adjacent to the project, so far as possible. Contact the affected homeowners directly to prevent conflicts. The Public Safety Department (police and fire), 771-0200 and 771-0215, Edmonds School District Transportation Department, and the Edmonds Public Works Department 771-0235 shall be notified 24 hours prior to the lane shift for construction. Proper provisions shall be made for public convenience, safety and travel. Any asphalt concrete pavements, crushed surfacing, gravel base or water required for maintaining traffic during the life of the project shall be placed by the contractor immediately upon request by the engineer and/or inspector. All unattended excavations shall be properly barricaded so as to prevent accidents. Construction along or across the City right-of-way shall be as per the contract documents, City of Edmonds Standards, or as directed by the engineer and/or inspector. City of Edmonds PUG ET SOUND ENERGY 6819 174 ST SW Order # 107008956 Date: 6/1 /2000 4cl <?> -4- H-i �-" H GO (9 NOTE: 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR RESIDENTIAL STREETS (25 MPH) 2. FLASHING BEACON SHALL BE INSTALLED AT EACH SIGN FOR NIGHT—TIME USE. 3. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER. 4. FLAGGERS; REQUIRED TO CONTROL TRAFFIC WHENEVER THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT. S. SIGN SIZE PER MUTCO. LEGEND: 91 CONE OR CHANNELIZING DEVICE (SEE SM 702) 174 ST Lij C.- 0 0 Z TRAFFIC CONTROL PLAN City of Edmonds Submitted by: Juliano Nguyen Engineering Planner 425-290-7026 ci PugeiSoundEneigy,lnc. I n = io I Of:f� 69�f MAI N f I 1� - I N 2" 1, 1 N6 6-r0f2f96K 9-N C� � 319-W C� 60M -/-320'W 1-74 a -r cl lAl % I�X. 2" 15—fw—I 21 x i I G u f 6 PK019. 2" M06 I P MA I N I 2-N �-NO MA I N 37-1'W C� GAS MAIN INSTALLATION RETIREMENT WU ID SIZE LENGTH TYPE MANUFACTURER 2. 55' MP�l GAS MAIN PRESSURE & TESTING TYPE TEST: PRESSURE; TESTED BY: DATE ON: / / TIME ON: DATE OFF: / / TIME OFF: DATE ON: / / T I ME ON: DATE OFF: / / TIME OFF: DESIGN: PSIGISYS MAOP: PSIGI 3: NOTES: The,..,C i ty of Edmonds 1. fll�L,9 IOGAT6 AW, UflWfI16 6) GAI,L, 21 HOUK6 WOKO� 016,6,IN&t 1-600-121-5555 2. 6UKVI�Y 16 NOT 9lWUIKlW. 3. MAINTAIN A MINIMUM Of 5' HOKIZONTAL, ANQ 3' WKTICAL, GL4AKANGO fROM ALA, CITY UT11,1TI66 ANO AVFUKffNANG0�6. 1. CUT 6 1 N PAV I N& AKI� 6HOWN A6 5. GUT6 I N PAV I N& ANT I G I PATIW. 6. PROJI�Gf MANAWs VOU& U61TALO 125-356-7520 ot4 'VOt for ' L'�r Constrijctio,, CALL1 —800-424-5555 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF FACILTTIFS 5� REAL ESTATE/EASEMENT PERMIT I�OMON06 Al 3) FUNCTION CONTACT PHONE NO DATE 2� PROJECT MGR: U6 1 0 025) 356 -7520 05/ 23v 00 APPROVED BY: -p. REV# —! I DATE BY DESCRIPTION ENGR - GAS: COU I NTY 6t'�IOHOM I 5H EMER SEC WorK Center N6NH& DRAWN BY: J. N&UYE�N (125)290 -7026 05/23/ 00 REVISED BY: I 1/4 SEC 5W -05- 27- 1 OP MAP 156.066 PLAT MAP 159.070 APPROVED BY: FOREMEN #1: U-NIIAP# (POWER) CIR MAP# CIRCUITst FOREMAN 42: MAPPING: JOINT FACILITIES ARRANGEMENTS �"UT I L I T I ES ,CONTACT PHONE4 PUGET SOUND ENERGY 28 MPI� 112 MAIN 6XTII�N610N TO 66KVE�Kt 6619 171 6-f W IWIVIONIP6 INCIDENT# DRAWING# SAP SUPERIOR ORDER# 107006956 1 SCALE: 1 40 1 1 1 / 1 NOTICE: No warranty of accuracy. The information shown on the attached map(s) was compiled for use by the City of Edmonds, its Employees and Consultants. The City of Edmonds does not warrant the accuracy of anything set forth on these map(s). Any person or entity requesting a copy should conduct an independent inquiry regarding the information shown on the map(s), including, but not limited to, the location of any sewer stub shown. Such sewer stubs may or may not exist and may or mav not exist at the location shown. Neither the City of Edmonds nor its employees or officers shall be liable for the information given on map(s), nor for any one representation provided based upon said map(s). --CITY OF EDMONDS Call PRospect 6-1107 when work 'IC CENTER WATER -SEWER DEPARTMENT 4WVIC C Is ready for Inspection. (No Inspec. tions Saturday, Sunday or holidays.) NO 3729 'S -1 -EWER PERMIT S1 BE ADDRESS ...................... 6.819 ... ..... 1.74.th ... S.tre.et .... S ...... W .. ..... .. ....... .... on OWNER ........................... M ... ns ......... B ... e --- t..t.-v ...... Hin. ... t ............................. CONTRACTOR ...... �y .�jq�?.qq�k..S.ewe.r .................................... .. ....... .. Perinission is granted .... W-.,w MC 2 0 ..... . .. .......... �y ........ 197Q ..... for .... ................... days to REPAIR or CONNECT a side sewer with City Sewers.in accordance with application on file and governing ordinances. ATTENTION IS CALLED TO THE FOLLOWING: NOTE No. 1—The owners of the property may obtain a permit to construct sewer inside property line. A licensed Side Sewer Contractor must be employed to construct side sewer in street axea. Do not cover any portion of sewer before it has been inspected. NOTE No. 2—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit. NOTE No. 3—Top of side sewer must have at least 30 inches coverage at property line and 12 inches Inside property line; minimum grade of 2o/,. No bonds in grade sharper than 'A will be permitted. NOTE No. 4—Trenches in street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper work which may develop within one year of completion. NOTE No. 6—It is unlawful to alter or do any other work than Is provided for in the permit, or to do any work on the main sewer or its appur- tenances except to insert the pipe into the wye.