6922 163RD PL SW.PDFiiiiiii . III
881
6922 163RD PL SW
CITY OF EDMONDS
�' /NE W
ADDITION
RETIREMENT
STREET FILE ASSET INFORMATION SHEET
ASSET NO.
ADDITION TO ASSET NO.
DESCRIPTION C�N C -,
SERIAL NO.
LOCATION DEPT. NO.
PURCHASE ORDER NO.
PURCHASE ORDER DATE
COST
*PROJECTNUMBER
PROJECT COMPLETION DATE 3-31-70
COST
ys Go 1(
B.A.R.S. ACCOUNT NO. 0 -0
ESTIMATED LIFE (�q;6
INITIATED BY DATE APPROVED BY
"SUBMIT ASSET INFORMATION SHEET WITH FINAL PAYMENT REQUEST
*SUBMIT ASSET INFORMATION SHEET UPON CLOSE OF PROJECT
ACCOUNTING ONLY
D /DEPRECIATE
MONTHLY DEPRECIATION AMOUNT
ANNUAL DEPRECIATION AMOUNT
G.L. ENTRY
REFERENCE
INITIAL
DATE
BATCH NO.
DEPARTMENT FILE
-zr
co
C)
V)
N D -M I T
CITY of EDMO s8TREET FILES I D E S E W E R KE R
I
For Inspection Call 771-3202 PERMIT NO.
Address of Construction:
Property Legal Description (Include all easements): ±t P�or/L/
Owner and/or Builder: o- n t
_71P
contractor & License No:
Single Family Residence
Multi -Family (No. of Units
C-o*mme�rci:al - (NT. of --f i`,�t-or(r'Uh_i ts
Invasion into City Right -of -Way: No �,� Yes (If Yes, Right -of -Way
Construction Permit required. Call One -Call -Center (1-800-424-5555) before any
excavation.)
Cross other Private Property: No Yes (If Yes, easement required,
attach legal descriptif'o-n and county easement number.)
PLEASE READ THE ITEMS LISTED ON THE BACK
JREcCl
_VED
3-Z 3-
7 1,990 Date
certify -that I have read and shall comply
with the items listed on the back. PUBLIC &VORI(S
Permit Fee:
Trunk Charge:
Assessment Fee:-1-06ac)(_�)
Partial Inspection:
Jssued By:
bate Issued:
Receipt No.: z 07Z
Comments Date Initial
I Irv(
Final Inspection Approved:
'Ddte Ini'tial
Rejected:
—1—ni
Reason Nate tial
1.
PERMIT MUST BE POSTED ON JOB SITE
0
Wh-ite Copy - File Green Copy - Inspector Buff Copy - Applicant
0
0
The City of Edmonds
Side Sewer Drawing
EASEMENT NO - --------------------------------------------
NEW CONSTRUCTION Ce REPAIRS F� LID NO - ------------------ - ASMT. NO . ....... ..........
OWNER ------------------------------------------------------------------------------------------------ CONTRACTOR --- I ... ----- N�X.�sc-r,) -------------------------------------------- PERMIT NO. D-3134-
JOB ADDRESS ... . .. ZAA)
---------- ------------------ LEGAL DESCRIPTION: LOT NO - -------------------------------------- BLOCK NO - ------------------------------------
PWW-0001 -11/75 (REV. 11/78)
NAME OF ADDITION ..............................
t>'
0-\,o OWL? -Tb
0;!
k4
WIF-VIC,
:L 0
V4
VA
-----------------------------------------------------------------------
v �OOD Lli�AE
----------------------------------------- - - --------------- ...
&
.ed:
DATE----- Q.0 ............. ..... .
NOTICE:
No warranty of accuracy.
The information shown on the attached map(s)
was compiled for use by the City of Edmonds,
its Employees and Consultants. The City of
Edmonds does not warrant the accuracv of
anything set forth on these map(s). Any person
or entity requesting a copy should conduct an
independent inquiry regarding the information
shown on the map(s), including, but not limited
to, the location of any sewer stub shown. Such
sewer stubs may or may not exist and may or
may not exist at the location shown. Neither
the City of Edmonds nor its employees or
officers shall be liable for the information given
on map(s), nor for any one representation
provided based upon said map(s).
DATE: /r
MEMO TO:
FROM:
SUBJECT: SEWER CONNECTION CHARGES
STREET FILE
,/,,�Zz- 16-3 pz--54/-�
Z2 / .-� A�
(Street AddressY
(Legal Owner)
Single Family Residence Subdivision Plat
PRD Multiple Commercial
LEGAL DESCRIPTION:
Z.F.F. Calculation:
Z.F.F. x ( ) =
$
Connection Fee
Lateral x(
$
Lateral Charge
$
Equivalent Count
—5-�o
(when applicable)
Unit(s) x($25.00 $
0
Trunk Charge
Permit
Z7�
TOTAL
st
a STREET FILE 0 — — -?&e1u4—iiz&
CITY OF EDMONDS
CONSTRUCTION PERMIT APPLICATION
USE PERMIT
Q,
ADDRESS
go,,22 7VO'ki
a:
LU
z
0
OWNER NAME/NAME OF BUSINESS
. +
LEGAL DESCR�� C*HECK
SLIRDIVISION NO.
LID NO.
0
K
MAILING ADDRESS
I q -1 p, q
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP.
EXISTING—Sel- REOUI RED DEDICATION 41�5___
PROPOSED—_
TESCP
APPROVED BY
CITY
go ryy,
TELEPHONE NUMBER
ow
Ix:
",I
NAME
A A I A
RIGHT OF WAY CONSTRUCTION PERMIT REQUIRE#
STREET USE PERMIT REQUIRED .
M
Uj
W
K
ADDRESSI
REVIEW BY
SEE ENGINEERING MEMO DATED
�ehel 1.8
z
W
CITY
(ZAj1,t-_M WR,
TELEPHONE NUMBER
t3 D 9
REMAR
;
[ADD_4145;Wil7MI104�6
0
cc
1
z
0
NAME
/Z44 2%414re--W,10'
ESJSZ�
METER SIZE
1
BUILDING SUPPLY SIZE
URE UNITS
cr
W
CIN�
TELEPHONE NUMBER
14 4�
REWARKS
/'K, U
STATE LICENSE NUMBER'
1Z
SIGN AREA
ALLOWED PROPOSED
ENV. REVIEW
COMPLETE EXEMPT
ADB NO.
z
2
W
0
W
Legal Descript7ion of Property - include all easements
(show below or attach two copies)
SHORELINE#
VARIANCE OR CU
PLANNING REVIEW BY
DATE
LOP
SETBACKS —FEET
FRONT S=L,5 4 ;7-5,
HEIGHT
LOT COVERACg
jr:;I�jb
z
z
-MY PELL T 2 C)
REMARKS
z
0
Fir
NEW RESIDENTIAL PLUMBING
L11__r
1:1 ADDIALTER El COMMERCIAL MECHANICAL
1:1 REPAIR E] APT. BLDG. SIGN
EXCAVATE FENCE
E] DEMOLISH OR FILL E] (_ x _FT)
CARPORT swim
REMODEL GARAGE EIPOOL
CHECKED BY
ITYPE OF CONSTRUCTION
CODE
HEIGHT
zs
SPECIAL INSPECTOR
REQUIRED
171 YES NO
AREA
OCCUPANCY
GROUP
OCCUPANT
LOAD
F WOOD STOVE/ RETAINING WALL/
INSERT ROCKERY E] RENEWAL
REMARKS
PROGRESS INSPECTIONS PER UBC 305
z
0
fil�41'06wle_
_j
0
W
W
0
co
NUMBER OF STORIES
I
NUMBER OF
DWELLING
I UNITS
�5�m: k—S Rg:i-o R T
0
—
NATURE OF WORK TO BE DONE (ATTACH PLOTPLAN)
M,O- Uki III Ir\ S� rylt,\
W,4
ZW11-11 g-,o,0,1_=
7 _ZM5aLC170V&4W
VALUATION
FEE
PLAN CHECK FEE
BUILDING
PLUMBING
'Ins
MECHANICAL
GRADINGIFILL
This Permit covers work to be done on private property ONLY.
Any construction on the public domain (curbs, sidewalks,
driveways, marquees, etc.) will require separate permission.
STATE SURCHARGE
Permit Application: 180 Days
Permit Limit: 1 Year - Provided Work is Started Within 180 Days
ENERGY CODE
Cn
"Applicant, on behalf of his or her spouse, heirs, assigns and
successors in interest, agrees to indemnify, defend and hold
harmless the City of Edmonds, Washington, its officials,
employees. and agents from any and all claims for damages of
DATE: / L-71 ZIE'221-1--
-4
MEMO TO: Permit Coordinator, Building Division
FROM: Dan Smith, Engineering Inspector
ADDRESS:
A
OWNER:
��:? "00;z�-'--54-- .
After review of the subject building permit application, we have the
following comments:
1) Construction hours are: WEEKDAYS 7:00am to 10:00pm
WEEKENDS/HOLIDAYS 10:00am-to 6:00pm
2) A Right -of -Way construction permit is required for any work on
City property.
3) Connection to City water system required.
4) Connection to City sanitary sewer system required; obtain separate
permit.
5) Water and sewer lines to be separated by 10 foot minimum.
6) Driveway must be paved a minimum of 20 feet back from City
right-of-way; separate permit required.
7) Driveway slope not to exceed 14%.
8) Back water valve required if downstairs plumbing is below
elevation of upstream manhole.
9) Builder/Owner responsible for containing all temporary runoff and
erosion control'on site. Construction may not impact neighboring
properties in any way.
10) No burning of construction refuse without approval from Fire Dept.
11) Street to be kept clean of debris, dirt, mud, and construction
. materials. Contractor responsible for dust control.
12) Inspection required on drainage system, catch basin installation,
driveways, and sidewalks. A final engineering inspection is
required prior to the building division granting occupancy.
DATE:
MEMO TO:
FROM:
SUBJECT: SEWER CONNECTION CHARGES
treet Address
ISIOX-1
(Legal Owner)
Single Family Residence Subdivision Plat
PRD Multiple commercial
LEGAL DESCRIPTION:
Z.F.F. Calculation:
Z.F.F. x $
Lateral x( $
$
Unit(s) x($25.00 =.$
it �1-1
—;-76,0
- if
Connection Fee
Lateral Charge
Equivalent Count
(when applicable)
Trunk Charge
Permit
-
$
2 6—j- "' -Z�
TOTAL
st
4D
STREET Flh E
*J �J CITY OF EDMONDS OJECT NAME liffmi-- 1'p'earz� �Xo rt
ENVJRONMENTAL ASSESSMENT DATE SUBMITTED
The information on this form will be used to determine the effect of your action upon
the environment of the City of Edmonds. Please answer each question as thoroughly as
possible.
LAND
I"
Area Soils Type Sa,,J Limitations
Description of topograp I hy (% slope) max/jum. -Sile :5/gge isah614 49 11 exceed
Note: If gracring or filling w!
Grading: Estimated cubic yards 500 cubic yards, a grading &
Filling: Estimated cubic yards eyxar, filling plan must be submitted
with the application
Estimated area to be paved (including buildings) I 0'a 1) yr
Estimated area in open space (previous surface) 1�
2. WATER
stream - Estimated flow (cubic feet per second) - There�7,Ckr-e_ h<)
Will stream be altered? *VA If yes, to what �egree/
..... .... . Other water bodies?
Impact on storm drainage Method of handling runoff
Adjacent to shorelines zone? -n - Within 200 fee of MHHW? r10
3. YEGETATION
Type and approximate number of trees
Rinimum diameter of trees to remain % of trees to be removed a 10)6
Groundcover )AL� % to be removed -7o
Proposed landscaping, if any Se-L- �214n
4. EXISTING LAND USE WITHIN 300 FEET RADIUS OF PROPOSED DEVELOPMENT:
Single Multi- Other
Vacant Family Family Commercial —
North tk*LA i UJ A
South I. % �) %
East
West
5. CIRCULATION
Estimated increase in auto trips daily 4
Availability of public transportation
6. AREA OF IMPACT
Neighborhood City-wide Regional
7. EFFECT ON AIR QUALITY *—f*\. nrLz'
1pekl
8. CHANGES IN NOISE GENERATION
04/17/89
I
IVI
At,
U.
1 -9%, IZ%T, --
1W
"'J ' 1�,
104
71,
ft
it
12,
paMIT 009NIER
0 7b OF-
Icel"eter)
AeAO 7ftr
Mxe-
r
0 0
0.-
co
r-
. �41e
N
TRENT U��
i-RAc-r c mEADowDAtK HE3(3HTS 'PRO.
EDMONDS VYA
fNTr- fLA" ,:2,6
FILE #
DETERMINATION OF NONSIGNIFICANCE
Description of proposal New single family residence
Proponent Trent Nelson
Location of proposal, including street address, if any
Lead agency City of Edmonds, Planning Division
The lead agency for this proposal has determined that it does not have a prob-
able significant adverse impact on the environment. An environmental impact
statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was
made after review of a completed environmental checklist and -other information
on file with the lead agency. This information is available to the public on
request.
There is no comment period for this DNS.
This DNS is issued under 197-11-340(,2); the lead agency will not act on
this proposal for 15.days from the date below. Comments must be submitted
by
Responsible official- Leigh Francis
Position/title Associate City Planner Phone 771 -3202
Address 250 5th Ave. N., Edmonds, WA 98020
Date 9/27/89 S i g n a t u r e_
)G7 You may appeal this determination of nonsignificance
to Jamps Driscoll, Hearing Examiner
at 2Sn Sth AvP_ N-, Edmonds, WA 98620
no later than October 6, 1989
by S-00 Q,m
You should be prepared to make specific factual objections. Contact
leigh Francis to read or ask about the procedures for SEPA appeals.
r_7There is no agency appeal.
"x
Complete this checklist for nonproject proposals, even though questions may be answered "does
not apply". IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions, the references in the checklist to the words "project," "applicant,"
and "property or site" should be read as "proposal," "proposer," and "affected geographic
area." respectively.
A. BACKGROUND
1. Name of . proposed project, if applicable: j0ti 2 C U fri i i E I D
r wv� QRA-A SEP 121989
2. Name of applicant: ftffllf WUNTER
3. Address and phone number of applicant and contact person:
9 1 �0- 4 W A - 9 �3;i
�a 0(p )
4. Date checklist prepared:
2-,
5. Agency requesting checklist:
C�k -�j c-� F F— c� iyn D n eA 3
6. Proposed timing or schedule (including phasing, if applicable):
A-,,5. N, P,
7. Do you have any plans for future additions, expansion, or further activity related
to or connected with this proposal? If yes, explain.
--R C)
8. List any environmental information you know about that has been prepared, or
will be prepared, directly related to this proposal.
n n e-
9. Do you know whether applications are pending for governmental approvals of
other proposals directly affecting the property covered by your proposal? If yes,
explain.
---n c)
10. List any government approvals or permits that will be needed for your
proposal, if known.
o Y) e,
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You'do not
need to repeat those answers on this page. (Lead agencies may modify this form
to include additional specific information on project description.) UJQ V;kU
O-J� (D"V 6-X� )A&YKA-
-)d�� ryy\.q*,V," �Xq-w POWVYI
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a street
address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with
any permit applications,related to this checklist.
IQ (A D Q —n o - "'M "-0-W - C"
C(�� aLA Vo U4_k.), .
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
EVALUATION FOR
AGENCY USE ONLY
1. Earth
a.'General description of the site (circle one): Flat, rolling, steep
slopes, mountainous, other S�
b. What is the steepest slope on the site (approximate percent slope)?
c. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know the classification of agricultural soils, specify
them and note any prime farmland.
G;5s
'AA to
.90,
d. Are there surface indications or history of unstable soils in the immediate CAV, PTU7Y-
vicinity? If so, describe.
,-r\ 0 611-�- OA _Wv� "-U1 5 0-*U�
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill.
ryy\-Aw a,
f. Could erosion occur as a resulV of clearing, construction, or use? If so,,
generally describe.
g. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
i ID 67 0
h. Proposed measures to reduce or control erosion, or other impacts to the earth,
if any:
GO' 16
CAt- &T>
2. Ai r
a. What types of emissions to the air would result from the proposal (i.e., dust,
automobile, odors, industrial wood smoke) during construction and when the project
is completed? If any, generally describe and give approximate quantities if known.
b. Are there any off -site sources of emissions or odor that may affect your
proposal? If so, generally describe.
,-"-Y"J-
c. Proposed measures to reduce or control emissions or other impacts to air, if
any:
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If
yes, describe type and provide names. If appropriate, state what stream or river it
flows into.
'_'N& �_�
2) Will the project require any work over, in or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
.-- t"*ON\A-
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be
affected. Indicate the source of fill material.
__Y\ cr_�
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
—)'\ Z—Y\—L
5) Does the proposal lie within a 100-year floodplain? If so, note location on the
site plan.
6) Does the proposal involve any discharges of waste materials to surface waters? If
so, describe the type of waste and anticipated volume of discharge.
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
&F1t_1_ SI;5pr. '�;t R&q
G;�CTt�504Kkc&L_
&Itj�*T
2) Describe waste material that will be discharged into the ground from septic tanks
or other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals ... ; agricultural; etc.). Describe the general size of the system,
the number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve.
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will
this water flow into other waters? If so, describe.
A-LM
2) Could waste materials enter ground or surface waters? If so, generally describe.
N�' 0
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any:
4. Plants
g�sf &Tt�m M V
krrvr�� C�A'*-f
C9;Z- Va;+�AJP,C--
a. Check or circle t es of etation found on the site:
jL deciduous tre - alde mapl aspen, other
-J,evergreen tr ce ar, pine, other
shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
c. List threatened or endangered species known to be on or near the site.
�Av-,�
d. Proposed landscaping, use of native plants, or other measures to preserve or
Pnhanrp vpaptatinn nn thp ,itp. if anv-
5. Animals
a. Circle any birds and animals which have been observed on or near the site or
are known to be on or near the site:
birds: hawk, heron, eagle, songbirds, other: ....
mammals: deer, bear, elk, beaver, other: ........
fish: bass, salmon, trout, herring, shellfish, other: ....
b. List any threatened or endangered species known to be on or near the site.
,�l Vy"
c. Is the site part of a migration route? If so, explain.
d. Proposed measures to preserve or enhance wildlife, if any:
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used
to meet the completed project's energy needs? Describe whether it will be used for
heating, manufacturing, etc.
AIL� Owl"
b. Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe.
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any:
,-T\
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur
as a result of this proposal? If so, describe.
.--)\ PKK-
1) Describe special emergency services that might be required.
,_YVP1r1_U
2) Proposed measures to reduce or control environmental health hazards, if any:
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? --,N
2) What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example: traffic, construction, operation,
other)? Indicate what hours noise would come from the site.
3) Proposed measures to reduce or control noise impacts, if any:
1'�
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
AN/Y\
b. Has the site been used for agriculture? If so, describe.
c. Describe any structures on the site.
d. Will any structures be demolished? If so, what?
e. What is the current comprehensive plan designation of the site?
h. Has any part of the site been classified as an "environmentally sensitive"
area? If so, specify.
M'M
VW-11
i. Approximately how many people would reside or work in the completed project?
j. Approximately how many people would the completed project displace?
yvl�
k. Proposed measures to avoid or reduce displacement impacts, if any:
r)�
1. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any:
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
b. Approximately how many units, if any, would be eliminated? Indicate whether
high, middle, or low-income housing.
c. Proposed measures to reduce or control housing impacts, if any:
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
b. What views in the immediate vicinity would be altered or obstructed?
c. Proposed measures to reduce or control aesthetic impacts, if any:
'�\ b--�k
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would
it.mainly occur?
b. Could light or glare from the finished project be a safety hazard or interfere
with views?
D
c. What existing off -site sources -of light or glare may affect your proposal?
-Y\ ON�
d. Proposed measures to reduce or control light and glare impacts, if any:
12. Recreation _Pllry�
a. What designated and informal recreational opportunities are in the immediate
vicinity? -P"
b. Would the proposed project displace any existing recreational uses? If so,
describe.
. N\
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any:
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national, state, or
local preservation registers known to be on or next to the site? If so, generally
describe.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
c. Proposed measures to reduce or control impacts, if any:
N'\ O-A-191
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed
access to the existing street system. Show on site plans, if any.
'�L P "LA.Z kAA1
b. Is site currently served by public transit? If not, what is the approximate
distance to the nearest transit stop?
C)
c. How many parking spaces would the completed project have? How many would the
project eliminate?
LQ NAA CrAl, id z
d.'Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private). Ao
e. Will the project use (or occur in the immediate vicinity of) water, rail, or
air transportation? If so, generally describe.
f. How many vehicular trips per day would be generated by the completed project?
If known, indicate when peak volumes would occur.
q
g. Proposed measures to reduce or control transportation impacts, if any:
ID
15. Public Services
a. Would the project result in an increased need for public services (for example:
fire protection, police protection, health care, schools, other)? If so, generally
describe. 11
b. Proposed measures to reduce or control direct impacts on public services, if
any.
16. Utilities
a. Ci rc I e—uti-lj-ti-ea �urr �-v—a.v a i I �.�—al—tLe 'site: �e`l�ectricit��' —na t�ural g a �s
sys 0
fuse se em�,
b. Describe the utilities that are proposed for the project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be needed.
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand
that the lead al: cy is relying on them to make its decision.
.. . . ... U
. tUr
Signature: ..... §VOJV1_ .. .............................
Date Submitted: .... 4. Q. X. I .........
D. Supplemental Sheet for Nonproject Actions (Rezones, Code Changes, Annexations, etc.) -- Do
not use this sheet for project actions.
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in general
terms.
1. How would the proposal be likely to increase discharge to water; emissions to
air; production, storage, or release of toxic or hazardous substances; or
production of noise? "'t VAk
Proposed measures to avoid or reduce such increases are: 'f�
2. How would the proposal be likely to affect plants, animals, fish, or marine
life?
Proposed measures to protect or conserve plants, animals, fish, or marine life are: �A tA",
3. How would the proposal be likely to deplete energy or natural resourcesi—� 6—�
Proposed measures to protect or conserve energy and natural resources are: I\ 6-�
4. How would the proposal be likely to use or affect environmentally sensitive areas
or areas designated (or eligible or under study) for governmental protection; such
as parks, wilderness, wild and scenic rivers, threatened or endangered species r)A 0—YOL
habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts are: —'Y) &I-\-
5. How would the proposal be likely to affect land and shoreline use, including
whether it would allow or encourage land or shoreline uses incompatible with
existing plans? "'�\ �—�
Proposed measures to avoid or reduce shoreline and land use impacts are:""'& 0-�
6. How would the proposal be likely to increase demands on transportation or public
services and utilities? Nv&-�
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or
federal laws or requirements for the protection of the environment.
ENVCHK3/PFORMS
0
I f I
GEOTECH
CONSULTANTS
13256 N.E. 20th St. (Northup Way), Suite 16
Bellevue, WA 98005
(206) 747-5618
(206) 343-7959
e"TREET RLE
HiLDING,
SEP 111989.
September 8, 1989
JN 89336
Trent Nelson
19724 State Route
Snohomish County,
9
Washington 98290
Subject: Geotechnical Engineering Study,
Proposed Single Family Residence.
Tract C - Meadowdale Heights Subdivision
Meadowdale Road and 163rd Place Southwest
Edmonds, Washington
Dear Mr. Nelson:
we are pleased to present this geotechnical engineering report
for the site of your proposed residence to be constructed in
Edmonds, Washington. The purpose of our work was to explore
site conditions and provide earthwork and foundation design
criteria for the proposed development. This work was
authorized by your acceptance of our proposal, P-9045 dated
April 4, 1989.
The subsurface conditions of the proposed building site were
explored with two test pits. We found the site to be
underlain with loose to medium dense, slightly silty, gravelly
sand overlying dense, slightly gravelly sand. The proposed
structure may be supported on conventional spread footings
founded on the dense sands. It is our opinion that the
existing site slopes are stable and that the proposed
development will not impact this stability provided the design
recommendations presented in this report are followed.
The attached report contains a more detailed discussion of the
study and our recommendations. If you have any questions, or
if we can be of any further service, please contact us.
Respectfully submitted,
GEOTECH CONSULTANTS, INC.
)4444
James R. Finley, Jr. P.E.
F
GEOTECHNICAL ENGINEERING STUDY
PROPOSED SINGLE FAMILY RESIDENCE
TRACT C - MEADOWDALE HEIGHTS SUBDIVISION
MEADOWDALE ROAD AND 163RD PLACE SOUTHWEST
EDMONDS, WASHINGTON
This report presents the findings and recommendations for our
geotechnical engineering study for the site of your proposed
residence in Edmonds, Washington. As indicated on the
Vicinity Map, Plate 1, the site is located immediately
southeast of the intersection of Meadowdale Road and 163rd
Place Southwest.
Development of the property is in the planning stage and,
therefore, only conceptual plans were available to us. The
site plan given to us included the footprint of the proposed
structure and provided topographic information for the lot.
Based on the conceptual plans, we anticipate that the garage
slab will be located at an elevation of about +131 feet. Upon
comparison of the estimated garage finish subgrade elevation
and the topographic -information, we anticipate that cuts of up
to twenty-three (23) feet below the existing ground surface
may be required for construction of the foundations.
we understand that rockeries are planned around the residence
to protect the existing slope and to allow about five feet of
level ground around the house. We recommend that we be
allowed to review the plans for the residence, including the
excavation plans.
SITE CONDITIONS
SURFACE
Tract C is a wedge-shaped lot located in the Meadowdale
Heights subdivision, immediately southeast of the intersection
of Meadowdale Road and 163rd Place Southwest. The northern
property line follows the curve of 163rd Place Southwest and
has about 155 feet of frontage on that street. The lot also
has about 188 feet of frontage along the Meadowdale Road
right-of-way.
The site is currently undeveloped and is covered with numerous
trees up to about two feet in diameter, along with low
underbrush. The development around the subject site is
entirely residential.
Trent Nelson JN 89336
September 8, 1989 Page 2
The existing site ground surface slopes sharply downward to
the west and to the north from the high ground located in the
southeast portion of the lot. Based on the topographic map
provided, which is incomplete for the western one-third of the
site, the steepest grade on the site is about 65-percent on
the northwest portion of the site.
SUBSURFACE
The site subsurface conditions were explored with two test
pits at the approximate locations shown on the Exploration
Location Plan, Plate 2. The extent of the field exploration
program was determined based upon the anticipated
construction, time and budget constraints, and site topography
and access.
The test pits were excavated on August 31, 1989 with a rubber -
tired backhoe owned and operated by Evans Brothers Excavating.
A geotechnical engineer from our staff observed the excavation
process, logged the test pits, and obtained representative
samples of the soils encountered. "Grab" samples of selected
subsurface soils were collected from the backhoe bucket. The
Test Pit Logs are attached to this report as Plate 3.
Both test pits encountered loose to medium dense, slightly
silty, gravelly sand to depths of two feet and seven and one-
half feet below the existing ground surface. Numerous roots
were encountered in this near -surface unit. However, it
should be noted that very few roots or organics were
encountered in the sand below a depth of four feet in Test Pit
2. Underlying the loose to medium dense sand unit was dense,
slightly gravelly sand.
The final test pit logs represent our interpretations of the
field logs and laboratory tests. The stratification lines on
the logs represent the approximate boundary between soil
types. In actuality, the transition may be gradual. The
relative densities and moisture descriptions indicated on the
test pit logs are interpretative descriptions based on the
conditions observed during test pit excavation. The logs
should be reviewed for specific subsurface information at the
locations tested.
GROUNDWATER
very slight groundwater seepage was observed only in Test Pit
1, at a depth of about seven feet below the existing ground
surface. It should be noted that groundwater levels vary with
Trent Nelson
September 8, 1989
JN 89336
Page 3
rainfall and other factors. We anticipate that groundwater
seepage could be encountered in project excavations,
especially during wet weather.
CONCLUSIONS AND RECOMMENDATIONS
GENERAL
it is our professional opinion, from a geotechnical
engineering standpoint, that the proposed development of this
site is feasible. Due to the steep slopes present on the
lot, access may be difficult during construction.
The subsurface conditions of the site were explored with two
test pits that encountered dense sands below the loose to
medium dense, near -surface soils. In our opinion the proposed
residence may be supported on conventional spread foundations
tounffe-cT —on the dense sanct. The dense san s Ha—ve ffi-gff—shear
strengths, thus provi-d—ing stable site slopes. However, the
looser, near -surface soils can be easily eroded if the
vegetation cover is destroyed. The contractor should limit
disturbance of the ve etation ag—mucff--as possible and
revegetate anE1 Ianascape assoon as practical.
The Landslide Hazard Map developed for the City of Edmonds by
Roger Lowe Associates shows the Meadowdale Heights subdivision
to be located outside the areas designated as hi h . k for
19 --r-Ls - —
landslides. Based on this map, discussions with ranine Gioff�
eanine. C
of the City of Edmonds, the highly competent soils encountered
in our test pits, and the stabIe natural slopes, we recommend
that the subject property be7ES-R—empted—from Meadowdale
Landslide ordinance.
As previously discussed, a major portion of th6 near -surface
sdils contain a large amount of roots and organics, making
that material unacceptable for reuse as structural fill.
FOUNDATIONS
The proposed structure may be supported on conventional
continuous and spread footings bearing on the dense native
soils underlying the loose sands. Footings founded on the 0
dense sands may be designed for an allowable soil bearing
capacity of two thousand (2000) pounds per square foot (psf).
A one-third increase in the a ove bearing pressure may be used
when considering short term wind or seismic loads.
GEOTECH CONSULTANTS, INC.
Trent Nelson JN 89336
September 8, 1989 Page 4
Exterior footinqs should be bottomed at a minimum depth of
twelve (12) inches below the lowest adjacent outside finish
gra e. A d-i-f-i—onar y, the- western northern exteri-or
footings 1=arted—Uff- the downslope side of the proposed
structure should be embedded a minimum of two (2) feet into
the dense sand. continuous and individual spread footings
should have minimum widths of twelve (12) and eighteen (18)
inches, respectively.
For the above design criteria,
settlement of footings founded
on the order of one-half inch,
of less than one -quarter inch.
dead loads from the building
construction.
it is anticipated that total
on dense native soils will be
with differential settlements
Almost all settlement due to
structure should occur during
Lateral loads due to wind or seismic forces may be resisted by
friction between the foundations and the bearing soils, or by
passive earth pressure -on the foundations. For the latter,
the, foundations must either be poured "neat" against the
exis.' -soj:-l---ur-----tRe—f-di-in-da-t-ion—wal-1--15-a-cWfYrr —must be
c7o mpva-c t-(�-d-:s-tjfff ural-f-i-17r:—K —coeff-i-cf—entof —fri7ct-fon —ofO .35
may-15e- u—sed7l5e-t-w-e-e-n--fhe—structural foundation concrete and the
supporting subgrade. The passive resistance of undisturbed
native soils and well compacted fill may be taken as equal to
the pressure of a fluid having a density of two hundred -
fifty (250) pounds per cubic foot (pcf).
SLABS-QN-GRADE
Floors and the garage slab may be supported on undisturbed
dense, native soils or on structural fill bearing on th�
competent native soils. In areas where moisture is
undesirable, a vapor barrier such as a 6 mil plastic membrane
should be placed beneath the slab.
PERMANENT RETAINING AND FOUNDATION WALLS
Retaining and foundation walls should be designed to resist
lateral earth pressures imposed by the soils retained by these
structures. The following recommendations are for walls less
than twelve (12) feet high which restrain level backfill.
From discussions with Papi Design, we anticipate that the
retaining walls planned for the residence will have a maximum
height of about eight (8) feet. Also, we understand that the
fill behind the walls is to extend horizontally about five
feet to the base of a rockery. It would be preferable to
extend the retaining walls, where possible, to limit the
0
0___7
H 9
IMA
MAI
GEOTECH CONSULTANTS, INC.
Trent Nelson JN 89336
September 8, 1989 Page 5
height of rockeries. Rockeries are not retaining walls and
thus rockery construction involves more risk than a retaining
wall. with a limited distance between the rockeries and the
building, maintenance will be difficult. If walls higher than
twelve (12) feet are desired, or if the backfill is sloping
uphill, then we will need to be given the wall dimensions and
slope of the backfill in order to provide the appropriate
design earth pressures.
Retaining walls that are designed to yield an amount equal to
at least 0.002 times the wall height, and have level backfill
extending a minimum of five feet behind the wall, can be
designed to resist the lateral earth pressure imposed by an
equivalent fluid with a unit weight of forty (40) pcf. Also,
if construction of the rockeries around the structure will
result in light construction equipment traffic within ten (10)
feet of the retaining walls, we recommend that the walls be
designed for a surcharge equivalent to an additional two (2)
feet of backfill. If walls are to be restrained at the top
from free movement, a uniform force of one hundred (100) psf
should be added to the equivalent fluid pressure force.
For calculating the base.resistance to sliding, we recommend
using a passive pressure equivalent to that exerted by a fluid
having a density of two hundred -fifty (250) pcf and a
coefficient of friction of 0.35. These values assume that no
hydrostatic pressures act behind the wall and that no
surcharge slopes or loads will be placed above the walls. if
these conditions exist, then those pressures should be added
to the above lateral pressures.
Retaining and foundation walls should be backfilled with
compacted free -draining granular soils containing no organics.
The wall backfill should contain no more than five (5) percent
silt or clay particles and no particles greater than four
inches in diameter. The percentage of particles passing the
No. 4 sieve should be between 25 and 70 percent.
Alternatively, a geotextile drainage product such as Miradrain
or Enkadrain may be used. The purpose of the backfill
requirements is to assure that the design criteria for the
retaining wall is not exceeded because of a build-up of
hydrostatic pressure behind the wall.
Where the backfill is to support walks or other slabs, we
recommend that the backfill consist of clean sand and gravel
containing less than five (5) percent silt or clay particles,
as this soil would be easier to compact in the excavation
prism than siltier soils. The top foot to eighteen inches of
the backfill should consist of a relatively impermeable soil
or topsoil, or the surface should be paved.
Trent Nelson
September 8, 1989
ROCKERIES
JN 89336
Page 6
We anticipate that rockeries will be used in the site
development. It is important to note that a rockery is not
intended to function as an engineered structure to resist
lateral earth pressures, as a retaining wall would do. The
primary function of a rockery is to cover the exposed
excavated surface and thereby retard the erosion process. We
recommend that rockeries be limited to a height of eight feet
and that they be placed only against dense, competent, native
soils. The construction of rockeries is to a large extent an
art not entirely �ontrollable by engineering methods and
standards. It is imperative that rockeries, if used, be
constructed with care and in a proper manner by an experienced
contractor with proven ability in rockery construction. The
rockeries should be constructed with hard, sound, and durable
rock in accordance with accepted local practice. Provisions
for maintenance, such as access to the rockery, should be
considered in the design.
If rockeries are planned to be constructed in front of fill or
loose soils, we recommend that the backfill be reinforced with
a geotextile or geogrid. We are available to provide
consultation regarding the design and construction of a
reinforced rockery backfill. The rockeries should be
constructed after the basement walls are backfilled. To do
otherwise could result in a safety hazard.
SITE DRAINAGE
We recommend the use of footing drains at the base of all
footings and earth retaining walls. Roof and surface water
drains must be kept separate from the foundation drain system.
The footing drains should be surrounded by at least six inches
of one -inch -minus washed rock wrapped in non -woven geotextile
filter fabric (Mirafi 140N, Supac 4NP, or similar material).
At the highest point, the perforated pipe invert should be at
least as low as the bottom of the footing or crawl space and
it should be sloped for drainage. The drains should be
discharged into a storm drain if one is available. In no case
should the water be discharged onto a slope in an uncontrolled
manner. A typical footing drain detail is attached to this
reportas Plate 4.
The excavation and site should be graded so that surface water
is directed off the site and away from the tops of slopes.
Water should not be allowed to stand in any area where
buildings, slabs, or pavements are to be constructed. It is
especially important that all final site grading in areas
GEOTECH CONSULTANTS, INC.
Trent Nelson
September 8, 1989
JN 89336
Page 7
adjacent to buildings should be sloped at least two percent
away from the building, except where the area adjacent to the
building is paved.
Groundwater was observed in one of the test pits during our
field work. Seepage into excavations is possible, and if
encountered, the water.should be drained away from the site by
use of drainage ditches, perforated pipe or French drains, or
by pumping from sumps interconnected by shallow connector
trenches at the bottom of the excavation.
EXCAVATIONS AND SLOPES
In no case should excavation slopes be steeper or greater than
the limits specified in local, state, and national government
safety regulations. Temporary cuts up to a height of four (4)
feet deep in unsaturated soils may be made vertical. For
temporary cuts slopes in the dense soils having a height
greater than four (4) feet, the cut should have an inclination
no steeper than 1:1 (horizontal:vertical) from the top of the
slope to the bottom of the excavation.
All permanent cut slopes into competent native soils should be
inclined no steeper than 2:1 (horizontal:vertical). Cuts may
be made at a 1.5:1 (H:V) if a non -degradable erosion control
netting is placed on the slope. Fill slopes, or slopes in the
loose, near -surface soils, should not exceed 2:1 (H:V). Water
should not be allowed to flow uncontrolled over the top of any
slope. Also, all permanently exposed slopes should be seeded
with an appropriate species of vegetation to reduce erosion
and improve stability of the surficial layer of soil.
SITE PREPARATION AND GENERAL EARTHWORK
We recommend that the building and pavement areas be stripped
and cleared of the near -surface soils, in addition to all
surface vegetation, organic matter and other deleterious
material. Stripped materials should be removed from the site
or, if desired, stockpiled for later use in landscaping. The
stripped materials should not be mixed with any materials to
be used as structural fill. Structural fill is defined as any
fill placed under buildings, pavements, walkways, or other
areas where the underlying soils need to support loads.
Geotech consultants, Inc. should observe site conditions prior
to fill placement.
Structural fill under slabs should be placed in horizontal
lifts and compacted to a density equal to or greater than 95
Trent Nelson JN 89336
September 81 1989 Page 8
percent of the maximum dry density in accordance with ASTM
Test Designation D-1557-78 (Modified Proctor). Fill under
pavements and walks and behind retaining walls should also be
placed in horizontal lifts and compacted to 90 percent of the
maximum density except for the top twelve.(12) inches which
should be compacted to 95 percent of maximum density. The
allowable thickness of the fill lift will depend on the
material type, compaction equipment and the number of passes
made to compact the lift. In no case should the lifts exceed
twelve (12) inches in loose thickness.
The fill materials should be placed at or near the optimum
moisture content. The optimum moisture content is that
moisture content which results in the greatest compacted dry
density. The moisture content of the dense, native soils at
the time of our exploration was near the estimated optimum
moisture content. The moisture content must be at or near the
optimum moisture content as the on -site soils cannot be
consistently compacted to the required density when the
moisture content is greater than optimum.
Ideally, structural fill which is to be placed in wet weather
should consist of a granular soil having no more than five (5)
percent silt or clay particles.
LIMITATIONS
The analyses, conclusions and recommendations contained in
this report are based on site conditions as they existed at
the time of our explorations and assume that the soils
encountered in the test pits are representative of the
subsurface conditions of the site. If, during construction,
subsurface conditions are found which are significantly
different from those observed in the test pits, we should be
advised at once so that we can review these conditions and
reconsider our recommendations where necessary.
This report has been prepared for the exclusive use of Trent
Nelson and his representatives for specific application to
this project. Our recommendations and conclusions are based
on the site materials observed, and engineering analyses. The
conclusions and recommendations are professional opinions
derived in accordance with current standards of practice
within the scope of our services and within budget and time
constraints. No warranty is expressed or implied. The scope
of our services does not include services related to
construction safety precautions and our recommendations are
GEOTECH CONSULTANTS, INC.
Trent Nelson JN 89336
September 8, 1989 Page 9
not intended to direct the contractor's methods, techniques,
sequences or procedures, except as specifically described in
our report for consideration in design. We recommend that
this report, in its entirety, be included in the project
contract documents for the information of the contractor.
ADDITIONAL SERVICES
It is recommended that Geotech Consultants, Inc. provide a
general review of the geotechnical aspects of the final
design and specifications to verify that our earthwork and
foundation recommendations have been properly interpreted and
implemented in the design and project specifications.
Geotech Consultants, Inc. should be retained to provide
geotechnical 'consultation, testing, and observation services
during construction. This is to confirm that subsurface
conditions are consistent with those indicated by our
explorations, to evaluate whether earthwork and foundation
construction activities comply with the intent of contract
plans and specifications, and to provide recommendations for
design changes in the event subsurface conditions differ from
those anticipated prior to the start of construction.
However, our work will not include supervision or direction of
the actual work of the contractor, his employees or agents.
Also, job and site safety will be the responsibility of the
contractor.
The following plates are attached and complete this report:
Plate 1 Vicinity Map
Plate 2 Exploration Location Plan
Plate 3 Test Pit Logs
Plate 4 Footing Drain Detail
Respectfully submitted,
GEOTECH CONSULTANTS, INC.
R - F
In 13F WA*,
Marc R. McGinnis
01 -
Geotechnical Engineer
0
eamesR. Ffnley, Jr. P.E.
g
/01 NA L 't Principal
GEOTECH CONSULTANTS, INC.
s
0 1143RD T.-t 143RDX 3: ST til SW z 0
D I > 3: 144TH PL SWDI 144TH S 73, S W
(L 41 It 6 T t7
H a >
PL SW
14 T cl
-lx sw sw
x 'c .5,
TH T
cc
IL H cc
z sw
N 5 X3: Pt sw z W 146TH PL
s !R-J . 9 s
MI T H PL SW T SW sw
146 H
PUGET RMA BEACHAry6k Z� 8 R. 3: W 9L 14JTH PL S
1 4 H 0 > M
NORM Ep'CtA - > x 148TH - 14 T S4 cp T SW D
P 148TH 149TH NORMA sw
'x
D t 19 !-c 14 A sw SIAW > I
> _sw_
FISH R > 3LPI iw.-
SOUN I.- �— — —
"-gtl PT a I PL SW �IWTH -:F-L
3:
151ST N 51 3.
150TH z 3: t L' -, S\N
�PL S
§'T WN S\Af 152ND
152ND ST
-P
> 152N
sw
3:153RD ST 3,
T . :PL
x Lx; SW 3; TH
CL
S 153RD PL
> 53'
.......... 54
W 155TH ST
> L
W
>
13:
W I < 156TH ST'
i 56TH < ST s (OAK RDI
156TH ............ x
LTH 157TH S T 3: X:
MEADOWDALE'�:.-.:..'
BEA CH
MEADO sw 3:3: 6 , 157TH PL SW SW
7TH sw
< -PARK:- XfI PL 1
159TH ST fl, �j - j -i TH PL SW
P sw I .............. a. CL a. X a H 99
ET
> Z
x taOT"st-ml.-
to- - - - - - - -
JIG x 160TH .4 sw 3. 0
LAYTBIT I `-
WHARF 1>11 HXPLSW 14
KEELEF9
'x
'001
K RD
!�IITH
L
ER
KEE C
A 161ST PL s�4 Co
MCI% K CORN��
v W 11NE
0. s N
163 D PL S
VY
164TH e 31_ H SW I
16-41H PL
3: >
>
FIR.
> PLSrrl
PL.S
164T
3: L SW ff-V-F R Ll
:r '..MFA00WVALF , a r.
X
H
z
I s �41 §8TH ST SW --L
q 6sw H ST SW
TH
OWDALE :R jfpaL SW
p -3: t MtD- -16-H- 16M.PL-S
>
)l I H ST
7
sw
70TH 7GTH PIL SW
ST x I I lzm
T i -j'> I I §_T SW 1172ND
3: 172NDI ST > ILI <-L 3: sl�
p�- ST SW �ci x 1 31
E sw_, Til 17'AIDSr 172N RZUQ—PL-M 9
173Rn 5 V73 D is I
a ST 73RDSVV
ST-SW--5 -- An- zs r ; 7SWI X 1-7 JJR
-W`1741m�§-L. < Ul 174TH uj PL SW
I '175TH u
PL
00 ST z 611,
W T mil D
y In X
3�' ! In SW C-4 0 PO cc
co 1?,
1 c two G Lf) W-THiTo- 176TH
tEt 11 10. 4N s jkzu)
. N -Q - Z9d PL SV
176T PL Ix 3: 'z 3:,,7,T S 176tH PIL SW 3:
X X 3: C' X LYN W
m Z
-:�%!.idUN I j sw 178TH I ST SW- —iTTTI
I � 'N
77TH 'T IN �11 7 �T CL s
'AL. sw
J >
SIVPHOMISH
H TH ST S
s .31 TH
3: P L IW
svv I CL
180TH . " �l s
XLjOTH 18DTH
'm Pu SW 3:
c tpn > 1stv
> < x 3� 5W PL SW
L < 18 1 S T P L W aess —TP -L -SWj` DEpr
182NO 18 s
R2NO ST l-u OF PL SW 82NO PL jW
I �PL 4D 82NC sw .50 LiCENSiN >
183RD ISM s PL Vi 3R:) 60 D < FL SW a! IVRD PL
> s .183RD PL 181T. ' 184 PL 183RP ST SY
vi. I ! 0 3:03: -1" 1
D
go Z ST SW&
:3: 1 T Wl lATH-1 T > 184TH 5j.1S,-W 184TH PL MIT. PL If SW
> 'A -
> 71� "3.w- IH
4 1. ;�Tl 185THI'3: PL 1 wei-T ST bw
4 186TH SNAX > >
- NTH -j 6TH PL SIN
j
ST :F x A86 H ST W
x I S IZ4 _1 ��H 'W
86T_ T'LNN
W
- 3 X3: 87TH
-1 z 3:
KO P
SO
131 188TH- - ST-SV�(f --3.4
X CL
H W I > FS > 188TH
PENNY LN SW 1821H PL SW '1189TH T > FS L'an Hj Ps LW <
VAJAind
-LYNNDALE-:i': f89 Ps
X 3: 'rH PL f-W-1
T > 3'. 190T T 169TI�Z PL SW
L SW'l '190TH <5T5W 4TH �'T W Iz 191 T
...&LE: 191 ST ST SW
jyj > 19 �ls T K. SW 19 0�vl sw x STM —
&I < P4 -Y�PLSVY,
IST 19.
9 s -r ST SW t�l 192ND 192ND ST 191ST PL--A�
sw 0 192ND ;T -E . vn ST S 2YD CH
r- 'yj- SW 6- ST > Ll W sw
9! PI A
-T z h X 47TI92ND L X S I
PL p. qW PARK Wy I Rlfi�ER < 192ND PL PO
c -- � !: I in I C;w -r -
GEOTECH
CONSULTANTS
VICINITY MAP
TRACT Cq MEADOWDALE HEIGHTS
EDMONDS9 WASHINGTON
.lob No. Dote
.89336 SEPT 89 N.T.S. - I
TP-1
TP— sea)
NO
- 8 V a/
I :i -, �/ou
( /4,
0
.�GEOTECH
CONSULTANTS
C3
TP-1
APPPRO.XIMATE TEST PIT LOCATION
EXPLORATION LOCATION PLAN
TRACT,C,:MEADOWDALE HEIGHTS
EDMONDSv,WASHINGTON
Job Aw.: """l
80331B SEPT 89 -=G'-O- 2j
00
5
V
E
15
SO
0
5
Es
15
TEST PIT
uscs Description Elevation, 1447'
Brown, slightly silty, gravelly SAND with numerous roots,
SM fine-grained, damp, loose
Gray, slightly gravelly SAND, fine to medium -grained,
moist, dense
uscs
Test pit terminated at 12.0 feet. Slight groundwater
seepage was encountered at 7.0 feet.
TEST PIT 2
Description
Elevofion:±141'
Brown to orangish-brown, slightly silty, gravelly SAND
with numerous fine roots, fine-grained, dry to moist,
loose
-becomes medium dense with occasional roots
Gray and brown, slightly gravelly SAND, fine to medium -
grained, moist, dense
Test pit terminated at 9.0 feet. No groundwater seepage
was encountered.
GEOTECH
CONSULTANTS
TEST PIT LOGS
L TRACT C — MEADOWDALE HEIGHTS
EDMONDS, WASHINGTON
dob No., Logged By: Plot :
89336 1 Dot80./31/89 I MRM 1 3
Slope bac*fill away from
f00fld0tion.
BACKFILL
See text for
requirements.
WASHED ROCK
6 M/n.
5K C...
NONWOVEN GEOrEXTZLE
FILrER FABRIC
GEOTECH
CONSULTANTS
rIGHrLINE ROOF DRAIN
Do not connect to tooting drain.
VAPOR BARRIER
SLAB I I
4 m1n.
--T
FREE - DRAINING
SANDIGRAVEL
4"PERFoRArED HARD Pvc PlPr
Invert at least as low as foothig andlor
crowl space. Slope to drain. Place
weepholes downward.
FOOTING DRAIN DETAIL
TRACT C - MEADOWDALE HEIGHTS
EDMONDS, WASHINGTON
Job No., 0aff: -5-171 . Rat
89336 1AUGUST 19891 N.T.S. 471
STREET FILE
2' . 2' 4'1&" SPALLS (Aftavu^�)
XV - 2 u 23'r DEEP, LRUS"ED ROCK
.r.e.
7
FROM
OLMLET
COWNROL
RIPRAP OUTLET
YVAZHED &VLAWL� fOUTFL-OW TRENCH, WN 60' I-ONG,
TOP 4 4- PWFkF POPE 'TO BE: L�F-VKL
- a
FROM
0 Lrr, ET
CC)NTKDL 4" PERF PIPE W"I'll CAPS
RUNOFF SPREADER OUTLET
STANDARD DRAINAGE PLAN
DETENTION SY
PAGE I OF
. . . . . . . . . .
DESIGN DATA
System Imperm Pipe
Number Area Diam
ZZ-
ILA
Pipe Orifice
Length Diamete
NOTES
1. Call Engineering Division (771-3202)
for prebackfill and final inspections.
2. Responsibility for operation and
maintenance of draipage systems on
private property is the responsibility
of the property owner(s). Material
accumulated in the storage pipe must
be flushed out and removed from catch
basins to allow proper operation. The
outlet control orifice must be kept
open at all imes
PzCjCj-V-je 0
SEP 12 19S9
T PERIWff COUNTER
"
CITY OF, EDMONDS
0 SurREET FILE
I
City of Edmonds
Revised Critical Areas Determination
Applicant: Nelson, William and Joan Determination CA-92-21
Project Name: Permit Number:
Site Location: 1 6922 163rd P1 SW Property Tax Acct #: L7412-000-022-00 I
Project Description:
Tree removal in an area identified on a wildlife habitat map.
Waiver Criteria (all criteria must be found to apply):
XX There will be no alteration of the Critical Area or its required buffers;
XX The development proposal. will not impact the Critical Area in a manner contrary to
the goals, purposes, objectives and requirements of the Critical Areas ordinance;
XX The development proposal meets the minimum standards of the Critical Areas
ordinance;
XX The above findings are based on the following conditions of approval:
1. The applicant must comply with any requirements the Department of
Wildlife might include conserning wildlife habitat area.
2. Conserns with slope and soil stability, the applicants ability to enjoy
reasonable use of their property, and the tree clearing ordinace will be
addressed during the Clearing Permit stage.
Based on the above findings and conditions, the requirement for a Critical Areas Study
associated with this development permit is hereby Waived, as authorized by Chapter
20.15B. 150 (B) of the Edmonds C;ommun' Develop t ode.
6A
le
Stephen 1P. Bullock
S4
i re
Name Si ature at
890.199-
City of Edmonds
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application for the City of Edmonds prior
to his/her submittal of a development permit
to the City.
The purpose of the Checklist is to enable
City staff to determine whether any potential
Critical Areas are or may be present on the
subject property. The information needed to
complete the Checklist should be easily
available from observations of the site or
data available at City Hall (Critical Areas
inventories, maps, or soil surveys).
RECEIVED
0 u"'T 2
PERMIT COUNTER
An applicant, or his/her representative, must
fill out the checklist, sign and date it, and
submit it to ' the City. The City will review
the checklist, make a precursory site visit,
and make a determination of the subsequent
steps necessary to complete a development
permit application. I
With a signed copy of thi's form, the
applicant should also submit a vicinity map
of the parcel with enough detail that City
staff can find and identify the subject
parcel(s). In addition, the applicant is
encouraged to include any other pertinent
information or studies in conjunction with
this Checklist to assist staff in completing
their preliminary assessment of the site.
I have completed the attached Critical Area Checklist and attest that the answers provided are
factual, to the best of my knowledge (fill out the appropriate column below).
Owner / Applicant:
—0C I
na,
Nwne
PI) 1-0
Title
4 1� 12� a — I
Street Address
City, State, ZIP Phone
S ature Date
Applicant Representative:
Name
Title
Street Address
City, State, ZIP Phone
Signature Date
Critical Areas Checklist
Site Information
Project Name: PA/ Permit Number:
Site.Location: 02P - .1 � -5 C_45� bw - Property Tax Account Number:
ft
Approximate Site Size (acres or square feet): cQ0,,-)nt)
I ............
Have you filled out a Critical Areas Checklist for a project on this site before?
General Site Conditions
I Au6
1. Has the site been cleared or logged? Date of most recent action:
Soils / Topography
2. In the Snohomish County Soil Survey, what is the mapped soil type(s)?,r�-VOVeI�
- C Mn
3. Describe the general site topography. Check all that apply. , 0 -
—Flat: less than 5 feet elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a
horizontal distance of 66 feet)
Hilly: slopes present on site of more than 15% and less than 30% a vertical rise
of 10 feet of horizontal distance.)
—Steep: grades of greater th'an 30% present on site.
Comments
Hydrology/Vegetation
4. Site contains areas of year' -round standing water:
5. Site contains areas of seasonal standing water 0 —Approx. Depthi:
6. Site is in the floodway 2a o floodplain Y�a of a water course.
7. Site contains a creek or an area where water flows across the grounds surface? _hLflows
are year-round? — Flows are seasonal?
8. Site is primarily: forested' meadow shrubs _; mixed
9. Obvious wetland is present on site: NN, n
10. Wetland inventory or map indicates wetland present on site: 'Th
Rey 3127/92
V D
STANDARD DRAINAGE PLAN
21 . 2* . (6" ORZT, 4�- & * SP^LLS
Vs, 2' ac r DEEP, 5/4'— r—RUS"ED vocbc
FROm 7
OUTLET
CON'TROL.
RIPRAP OUTLET
WA3HED CPPLXVUL OUTFLOW -rKENr-vt, MIN 10' LONG.
r Top 4 A- pa'FkF POPE -M 59 L-F-VKL
L-7
OLMET
CC)NTROL
4� PEIRF P%PF- WtTii CAPS
RUNOFF SPREADER OUTLET
DETENTION SYSi: IJ
PAGE I OF 3
a 1.4jo-i Vmj-
V R.
IMM"41.1
plan by
phone
date
DESIGN DATA
System Imperm Pipe Pipe Orifice
Number Area Diam Length Diameter
NOTES
1. Call Engineering Division (771-3202)
for prebackfill and final inspections.
2. Responsibility for operation and
maintenan ce of draipage systems on
private property is the responsibility
of.the property owner(s). Material -,
accumulated in the storage pipe must
be flushed out and removed from catch
basins�to allow proper operation. The
outlet control orifice must be kept
open at all times.
Z 0 9
4V
SEP .9. 19-1f.11
CITY OF EDMONDS
JA
�AV17
Wilding
height
�i>' v;n
144
t
I A\�W!6-
'41'
"c
all
L
f/
00orl/
20.
M44-
LJPPF-K
BASIN DETENTIO LENG cowF4,0L. CATCH
- �'IWTVE7 A, -
MAX COVER
OUTLUT
COOROC
IT,
5LOPF---
�7,
To Ovy, L-6 T
I(ftj P P OR
RUN%
110
SYSTEM SS SE ION
A/Z
14
CAT"
C-4 1�-
ALSIMIC11 &PLANEL oLrrF4W 'rPLENCK, MIN 10' LONG,
'TOP A* PE'FLF PIPE -M BC I wvCL-
FROM
--our�El'
CON-rRDL
'L
4" rZ.RF PIPE WITH CAP-S
RUNOFF'SPREADER OUTLET
2' 0 2' D— , -4�' (-" SPA'LLY. (01, cvu.,6)
2:. 2- DEEP, %'- UZUS"Et) VOCY
LrrLF_r -F
F;zom
OLrrLET
RIPRAP OUTLET
0 X A C(-
(-.)F-, J.� %.J 1 V L-
TC fsf!—�i 1�
L..: tf p F'o- K
-rp,EW-" COVER
3/4*_ WAS149:0
4 oiAm FTERF P
TRENCH CROSS—SECTION
m
T t44P
FF�, P" rpy�v,;v'
1 6TH AVE. K I
t-,v 1:4 M, WA MIff
01
,jTREET FILE
,69Z2 163, 1xvZ S1111
7.7-7—
Lippil- R
DETENRIC14 PIP LENG,04 CONTROL CATCH
(VENT) ZA,*%tI
It m IN, 2' MAX COVER
b4tdinq height
1 �70
7 0 LrT L, r. T
collfTROC
4qf,:r
+
SLOPF- 4.
To OVT
(pi p OR
t
le� Cr
RuNa
SYSTEM OSS SE ION
�T_ A�
11V)
All,
J
—4/
4
'All Z) VRA (al�-
?
RED &P-MINCL OLIT714OW TPE'NCK, t.AIN 10- LONG,
Top A* PcFLF PIPE "m bE -vcL-
FROM
0 Lrr. E7
_rP.0L
C0N
vi
4" ZRF P%PE WITH CAP -S-
R OFF SP ADER OUTLET
\<At
2' 2' (D" D— , A�- 46"
LRUS"ED ROCK
OUTLET
CON-1 FLO
RIPRAP TLET
C)F?- EfO U I ff LF--,-4—r
14, w
f
u
4j� 'T PE W_ �4 COVER
MT
G RAV E L
3/4
WAS14ED
4DIAM FFRF PIPS:
.0
A
TRENCH CROSS—SECT*10N
T
rll�+ T
OCT jq8q
Xau,85
alill C6UNTER
pevfv4A(T�'5
or
ir
�4 Mtl,�, W. #Z,uy;
,5f lyf��Solvl
1)�Wvlq6e- co
rn
RF-CF- IV F- D own
OCT 121989 P
rwsud�
PERMIT COUNTER
UPPF-R
cA.1-cvI
DETENTION PIPE Le"GT1,11 COV-rrIkOL CATCH
I' MIN 2' MAX COVER,
buildinq heiqht 11111��/ A
PZI Wr �70 1��o
cow$kok�
z SLOPE-4- 4-
To otFT
t-E T
!A4
PFIAD OR
U
5PR9kDER)
�T' SYSTEM SS SE ION
V
Ic
1"0
<1
'Ile
4
a 1 2f
LA -SHED &RANCI cc> w -rpc-NcK, MIN 10' LD"NG,
A
70 .41 PCKF PIPE "m BE
FROM
0 Lrr. ET
CON-T-ROL
00, L4 4 PZ-RF %PZ WITH CARS
RUNOF PREADE OUTLET
J32' 2' 4�-&" SPAL.� (0% cvu�,)
Z* 2- 3" DECP, UZU.S"ED V.')r-K
1 117-71--4 FIROM 7
OLrr L ET
CON, FLOL
RI RAP OUT T
MIRArl EC)OX
OK E20 U I \/ t L-FL,4T
L/-��ED >
tf D F 0
u
Covep,
��Trcr--r�T
ALZ
GRAV E L
4"OIAM FERF
AN!
4
I F-0 �t-Pv
TRENCH CROSS-S'ECTION
Lee
PP166tII4 ffwp
��Ty.�c r-1- r L
Hint
2; 1209 .1 41-
u 4-
too#
ol; i AV i7- W. t 1) IQ
rl , W`A m"o
cvc/
I -SF
STREET FILE
OCT I
K COUNTER
lli
I