700 ELM ST.PDF11111111111111
11186
700 ELM ST
CITY OF EDMONDS S.. SEWER PERMIT
ENT
WATER -SEWER DE
PERMIT
Call 775-2525 for side sewer inspections BEFORE covering any portion of the construction.
Inspection will be provided within 24 hours after requst. NO Sat., Sun., or holiday inspections.)
AD;,DRESS LOCATION OF CONSTRUCTION ....... D*�ekl ........ -71-P-4 .... ............................. IC-3 ..... ........................
7CD C:3
.. ......
PROPERTY LEGAL DES CRIPTION .......... t-1--x-4 . ..... i ....... ..................................................................................
................................................................ 0147NERANDJOR BUILDER ......... a ....... Ll'o
.................... . ....................... ** ...... ......... * ........
CONTRACTOR'S NAME & ADDRESS ...... C7-.A ... JAA.; ........ .................. . .............................. . ............................... ....
Permission Is granted ............ M�,r
.............................................. 1977`—��, for repair and/or connection of a side sewer to the city sanitary sewer
WM in accordance with City of Edmonds ordinances.
ENTION IS CALLED TO THE FOLLOWING:
NOTE No. 1—The owners of the property may obtain a permit to construct sewer Inside property line. A licensed Side Sewer Contractor must be employed to construct
side sewer in street area. Do not cover any portion of sewer before it has been Inspected.
NOTE No. 2—All work performed in city right-of-way requires an Invasion of Right -of -Way Permit obtalnable from the City Engineer's office.
NOTE No. 3—Obtain full Information regarding Ordinance 11.16.030 and Regulations governing side sewers when you get permit.
NOTE No. 4—Top of side sewer must have at least 30 inches coverage at property line and 12 inches Inside property line; minimum grade of 2%. No bends In grade
sharper than 1/s will be permitted.
NOTE No. 5--Trenches In street must be water settled and surface of street restored to original condition. Contractors shall be responsible for failure due to improper
work which may develop within one year of completion.
NOTE No. 6—It is unlawful to alter or do any other work than. Is- provided for in the permit, or to do any work on the main sewer or its appurtenances except to in-
sert the pipe into the wye.
DISAPPROVED E] Date --- ------- .................. By ................ Date ............ .... ... ...... BY
APPROVED Date.... :� . ..... 75 ............. By..- %� ... .......................... . ..
...........
Remarks: ....... . .................................. . ...................................... ... ............. ......................
...... Date ............... . ................... By ................
............................................................................
............................................................. . ........................................................................................ . .................................. . ............................................. .........
BOTH Permit Copies MUST Be Signed By Owner of Firm Performing Construction PRIOR To Request For Inspection
---- -------------- ---- ** ...... **-"* ....... .... hereby certify that the side sewer installation constructed under this permit
IF(Owner of Contracting Firm Performing Construction)
Onstalled in accordance with allgoverning ordinances of the City of Edmonds.
Datedthis ............................ day of ................................................................. 19 .........
Check BEFORE you dig for: Water E], Gas [-], Telephone [3, Power E], Sewer [:], Other E]
V i
for
City of Edmonds SIDE SEWER PERMrf EASEMENT NO - ---------------------------------------------
NEW CONSTRUCTION REPAIRS LID NO.
IT
OWNER-- ------- ------ ------------------ M ------------- CONTRACTOR. -V�A--- - ------------------------------------------------------ ........ PERM ------------
----------------------
JOB ADDRESS LEGAL DESCRIPTION: LOT NO - -------------- ;� -------- ---------- BLOCK NO. ------------ --------------
----------------------------------------------- I --------------------------------------------------------------------------------------------------------
uj
ui
ui
a
r C::�t-4
NAME OF ADDITION .. .... —= t w -."� ........ 4 1 f ---\ " -------- t� --- ........ ...................... . .................
Approved:
.... .. ..... --- - ------------
DATE ...... By //;Ow/ow *
The City of Edmonds
APPLICATION
for
SIDE SEWER PERMIT
NEW CONSTRUCTION [] REPAIRS
OWNER...... --L .... 11 ................. . -----------------------------
ADDRESS.... . ............................. ............
EASEMENT No.
CONTRACTOR ......... /I ............................................ ..................... PERMIT No. ...s rw4
.................
LEGAL DESCRIPTION: LOT No . ................................................ BLOCK No - --------------------------------------------
NAME OF ADDITION ................. ....... AP. P.-
Approved:
DATE------------------------------------------------ BY
/1? C. I S'P
May 3, 2010
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - 425-771-0220 - FAX 425-771-0221
Website: www.d.edmondsma.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Mr. Don Nelson
700 Elm St.
Edmonds, WA 98020
RE: Stop sign obstruction on 7 th Av. S
Dear Mr. Nelson:
GARY HAAKENSON
MAYOR
STREET FILE
Our records indicate that you are the owner of the property at 700 Elm St. We have noticed that
the vegetation on your property is obstructing the stop sign at the comer of 7th Ave. S and
Elm St. This is in violation of City code, from which the following is excerpted:
9.25.010 Violations.
A. It is unlawful for any person who either owns or has the right to possession, or both, of abutting real
property to permit the erection or maintenance of any sign, device, structure or vegetation in the following
circumstances herein set forth, and in the event of circumstances presently existing which by reason of
this section are now in violation of the Edmonds City Code, said person shall immediately remove the
same:
1. In such manner that it obscures or conceals any traffic control sign, signals or other device as
to interfere with the full and effective use and visibility of the same to the motoring or pedestrian public;
In order to reduce the hazard and enhance public safety, the City of Edmonds directs you to cut
back your tree to allow full visibility of the sign.
Please complete the modification and trimming by May 21, 2010. Your cooperation in bringing
your vegetation into compliance is appreciated. Please feel free to call me with any questions at
425-771-0220.
Sincerely,
BERTRAND HAUSS
Transportation Engineer
Incorporated August 11, 1890
Sister City - Hekinan, Japan
PERMIT SUBMITTED BY
GTE
jtqo I 7Y
E D s
I
UC TRENI
-S.770-7771 K R. 0.
V- 5 - - - - - - - - - - - Eop
-------------
--------------------------- ----------- w ----------------
e%nrr-%
Z
V)
U
04
0
L14
CITY OF EDMONDS
COMMUNITY SERVICES DEPARTMENT MAY 2 3 1991
RIGHT-OF-WAY CONSTRUCTION PERMIT ENGINEERIM
A. e Owner: Washington Natural Gas Com any B. * Contractor:
N%TS MercerSitreet
M9>4gdress WA 98111
City State Zip
Permit No.— 9/1
Issue Date C/
Name
Mailing Address
City State Zip
State License Number Telephone Number
C. 9 Address or Vicinity of Construction: 700 Elm Street
,..Install Gas Mains in 8 Avenue South from 16' North centerline of
Type of Work to be Don
Elm Way to 31' North centerline of Elm Street. Also from 25' East of 8 Avenue South
4�r"-West centerline of 7 Avenue South on 81m Street. Also from 19' South E&m Street
D. 0 Work in Connection With: El Sub or Plat 0 Single Family 0 City Projects
El Commercial 11 Multifamily KI Utility
E. 0 Pavement Cut: q Y 0 N F. 0 Size of Cut: 2 4 (6)
1
APPLICANT TO READ AND SIGN to 173' North on 7 Avenue South.= Per Attached Drawing:
892-517 (1)
INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds
harmless from any injuries, damages, or claims of any kind or.description whatsoever, forseen or unforseen, that may
be made against the City of Edmonds, or any of its departmefits or 6mployee'sj'in�cluding or not limited to the defense
of any legal proceedings including defense costs, court costs, ��Ii attorfiey`fe�s by reason of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE
YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK.
Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be
processed for issuance to the applicant. 1
• A 24 ho . ur notice is required for inspection; Please call Engineering: 771-3202 10 6 "a
• Work is to be inspected during progress and at completion.
• Restoration to be in accordance with City Code.
• Street to be kept clean at all times.
• Traffic Control to be in accordance with City regulations.
• All street -cut ditches must be patched with asphalt or City approved material prior to end of working day;
NO EXCEPTIONS.
I understand the above and that this permit must be,available at the job site for inspection purposes at all times.
Signature:
Date: April 6, 1991
This Permit Must be Posted at the Job Site For Inspection Purposes
Call DIAL -A -DIG Prior to Beginning Work
APPROVED BY PERMIT FEE:
Time Authorized: Void after days. Restorat on Fe
1>15goL..0010.7 i:
Special Conditions: D15(LOPTIOtJ F Receipt No.: 41
-To §f- rALC_L-t.A-r,6,Q 14j':5'7C�L(_ t)-06. Fund I I I Fee:
RELEASED BY;
Owner or Contractor
Street Cut Dimensions: — x
D ate 5_7d�- ?/ INSPECTED BY
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
- = 3
.- L
Date
Eng. Div. March 1999
FIELD INSPECTION NOTES (Fund I I I - Route copy to Street Dept.)
Comments:
Diagram:
f ,
CONTRXCTOR CALLED FOR INSPECTION
I
7t
Partial Work Inspection by P. W.:
Work Disapproved By:
FINAL APPROVAL BY:
0 YES 0 NO t
Date:
Date:
t
Eng. Div. July 1985
1�
06/24/91 08:39 N.O.B. WASH. NAT. GAS.
9
L4 444
LA � -I
x
131T
-F lAt--s -TIA C C-U7--' 1F '.39-
C LY^V\ s T-
AL-L
A40
oil-
V- -S
in)N-) e L-v-, 'c % ,
� T-'.
City of Edmonds Permit No:
RIGHT-OF-WAY CONSTRUCTION PERMIT Issue Date: q_ 91
A. Address or Vicinity of Construction: 700 ELM St.
B. Type of Work (be specific): GTE to place,operate, and maintain a buried service wire from
existing pedestal #7690, located at 716 ELM St.,then WEST to a residence at�700 ELM St.
GTE to plow 120 ft.,push 2 driveways, 47 ft.,and push 0 roads,O ft.
R.O.W. footaqe is 167 feet. Please see attached sketch.
C. Contractor: GTE NORTHWEST INCORPORATED
MailingAddress: 2312C W. Casino RM,Ever@tt
WA 96JU4
State License #:
D. Building Permit 4 (if applicable
Enqr. Terry Anderson 771-8683
Contdct: Sherry Jones.Permit Coordinator
11
Phone..'.,, 425-710-4133
Liability Insurance: Bond:
Side Sewer Permit # (if applicable):
E. [_J Commercial CityProject [Z EUC(PUD SE, CHAMBERS, OVWD)
Subdivision
Multi -Family Single Family Other GTE W.O. #2100-9POOlDB 242310
INSPECTOR-
F. - PAVEMENT: E] YES [M NO G. SIZE OF CUT x H. Charge: $
CONCRETE CUT: F� YES M NO
APPLICANT TO READ AND SIGN
IDEMNITY. Applicant understands by his/her signature to this application helshe holds the City of Edmonds harmlessfrom injuries,
damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and
attorneyfees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS
COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBITOR CREDIT WILL BEPROCESSED FOR ISSUANCE TO THEAPPLICANT._
* traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every
flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the
required training in their possession. -
* Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City -
approved material prior to the end of the workday - NO EXCEPTIONS.
* Three sets of construction drawings of proposed work are required with the permit application.
IRAVEREAD THE ABOVE STATEMENTS AND UNDERSTAND THE PERMITREQUIREMENTS AND ACKNOWLEDGE
THATIMUSTMAKE THE PINK COPY OF TH4 PERMITA VALLABLE ON SITE A TALL TIMES FOR INSPECTIONS
f,q
q,;�_yl
Dave Hawkins,Sec. fW!rWU-_%rsA9t-4.t19,
CALL DIAL -A -DIG (1-800-424-5555) PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
Approved by: Right-of-way Fee: 07000
Time Authorized: Void After Disruption Fee/Fund 111:
Special Conditions, Restoration Fee:
Total Fee: V'7000
Receipt No
Issued by: Z14— I
J
UPON COMPLETION OF PERMITTED WORK, AN ENGINEERING FINAL
INSPECTION IS REQUIRED PER CHAPTER 18.00 OF THE EDMONDS
COMMUNITY DEVELOPMENT CODE.
FINAL APPROVAL OF PERMITTED WORK.
INSPECTOR'S SIGNATURE DATE:
For inspection requirements see Engineering Information Handout.
I NO WORK SI-IALL BEGIN PRIOR TO PERM ITISSUANCE
W W'20r
1-t I 1.)-is
19 JrLow
STW iP
l&omv:*4C,?Ch6Lek0t
41,w4ol,lb
z
0
Yzl 1.3
1911
u A(
irk 1911
VovJCPA4 C P CAME
t-n
T.4 I IS's
.,A
Lo
0
F1.3 _j ww *za' as 304-i
C, 50, r-.j
I IC04- I N
�:, lllt�j
1,)404 mf
I
A-Mvic,
WAY
vll-,"en,m-r a,-mPr-r-2
NC3-TE:S
1 CALL 1-800-424-5555 48 HOURS PRIOR
TO CONSTRUCTION TO LOCATE UTILITIES
2 SURVEY NOTREQUIRED
3 LAY DETECT WARNING WIRE OVER ALL
DIRECT BURIAL PE PIPE
4 INSTALL ONE POUND ANODE FOR EVERY
1000'.OF LOCATING WIRE
5 DEACTIVATE ALL INACTIVE STUBS,
,-GERY��, AND DRIP.S, _qCT. cu-ri�
C-APALA- It-4Ar--rlVEl=-eF_Nict=,6
6 REMOVE DEACTIVATED VALVE ON CASING
WHERE PE PIPE IS INSERTED
7 PLUG ENDS OF DEACTIVATED MAIN WITH
CONCRETEOR FROTH-PAK
8 CONTACT OPERATIONS DISPATCH FOR AN
"ACTIVE SERVICE RUN" - 48 HOURS
PRIOR To CONSTRUCTION
9 ALL INSIDE METER SETS SHOULD SL
LOCATED OUTSIDE
10 INPICA-rS�5 Ac-rivv--'
ALL-