Loading...
700 MAIN ST (2).PDFiiiii . iiiiiiiii 12084 700 MAIN ST 6 0 ADDRESS: 0 0 TAX ACCOUNT/PARCEL NUMBER: BUILDING PERMIT (NEW STRUCTURE): COVENANTS (RECORDED) FOR: CRITICAL AREAS: — DETERMINATION: E] Conditional Waiver E] Study Required E] Waiver DISCRETIONARY PERMIT #'S: IfU :) - [!A -1 Z DRAINAGE PLAN DATED: PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED PERMITS (OTHER): PLANNING DATA CHECKLIST DA SCALED PLOT PLAN DA SEWER LID FEE $: LID #: SHORT PLAT FILE: LOT: BLOCK: SIDE SEWER AS BUILT DATED: SIDE SEWER PERMIT(S) #: SOILS REPORT DATED: STREET USE q I- 105. WATER METER TAP CARD DATED: ST61EET FILE Cobalt Geosciences RECEIVED F- EB 0 5 2015 I)EVELOPMENT SERVICES CouNTER Limited Geotechnical Investigation Proposed Amphitheater Frances Anderson Center 700 Main Street Edmonds, Washington June 21, 2015 0 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON Table of Contents 1.o INTRODUCTION ............................................................................................................. I 2.0 PROJECT DESCRIPTION .............................................................................................. 1 3-0 SITE DESCRIPTION ....................................................................................................... I 4.o FIELD INVESTIGATION ............................................................................................... 2 4.1.1 Site Investigation Program ................................................................................... 2 5-0 SOIL AND GROUNDWATER CONDITIONS .............................................................. 2 5.1.1 Area Geology ........................................................................................................ 2 5.1.2 Soil Conditions ..................................................................................................... 2 5.1.3 Groundwater ........................................................................................................ 3 6.o GEOLOGIC HAZARDS ................................................................................................... 3 6.1 Erosion Hazard .............................................................................................................. 3 6.2 Seismic Hazard ................................. : ................................................................... 3 7-o DISCUSSION .................................................................................................................... 4 7.1.1 General ................................................................................................................. 4 8.o RECOMMENDATIONS .................................................................................................. 4 8.1.1 Site Preparation ................................................................................................... 4 .8.1.2 Temporary Excavations ........................................................................................ 5 8.1.3 Erosion and Sediment Control .............................................................................. 6 8.1.4 Foundation Design ............................................................................................... 6 8.1.5 Slab -on -Grade ...................................................................................................... 7 8.1.6 Utilities ................................................................................................................ 8 8.1.6 Groundwater Influence on Construction .............................................................. 8 9.o CONSTRUCTION FIELD REVIEWS ............................................................................ 8 lo.o CLOSURE .................................................................................................................... 9 LIST OF APPENDICES Appendix A — Statement of General Conditions Appendix B — Figures Appendix C — Hand Boring Logs LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON January 19, 2016 i.o introduction In accordance with your authorization, Cobalt Geosciences has completed a limited geotechnical investigation for the proposed amphitheater structure located at the Frances Anderson Center at 700 Main Street in Edmonds, Washington (Figure 1). The purpose of the geotechnical investigation was to identify subsurface conditions and to provide geotechnical recommendations for foundation design and construction of the proposed structure. The scope of work for the geotechnical investigation consisted of a site.investigation followed by engineering analyses to prepare this report. Recommendations presented herein pertain to various geotechnical aspects of the proposed development, including foundation design and slab recommendations. 2.0 Project Description The currently proposed development includes removal of the existing stage and cantilever roof structure and construction of a new steel and wood amphitheater. We anticipate that the new structure will be supported by six isolated column footings which may be interconnected by strip footings. The structure will be approximately 30 feet by 40 feet in area. We anticipate that foundation loads will be light to moderate and that site grading will include cuts and fills on the order Of 4 feet or less for foundation placement. 3.0 Site Description The site area is located just southeast of the main building at the Frances -Anderson Center located at 700 Main Street in Edmonds, Washington (Figure i). The area of the proposed development encompasses an approximately 5o feet by 5o feet area centered at the existing stage (Figure 2). The current development at the site includes a wood framed stage area surrounded to the north, east, and south by lawn and landscaping. Along the west margin of the stage, a concrete wall extends downward to an asphalt paved parking area. The concrete wall extends north to South Up to 20 feet beyond the extent of the stage and is approximately 3.5 to 4 feet in height. A masonry wall is situated on the concrete wall and is approximately 16 feet tall. There are various cracks in both walls; however, the overall condition is good and the cracks are not indicative of structural failure or distress. There are 2 inch diameter weep holes near the base of the concrete wall approximately 8 to io feet on center. The stage is covered by a cantilever roof system that consists of steel I beams as vertical members with steel and wood framing for the roof. We anticipate that the vertical members extend 5 to 10 feet below grade and are likely surrounded by concrete. The lawn areas slope gently down toward the stage and the site is vegetated with grasses and sparse bushes and trees. As noted above, the site drops up to 4 feet along the west edge of the existing stage, where a concrete retaining wall is located. 1 P.O. Box 82243, Kenmore, WA c)8028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 The overall property is bordered to the north by Main Street, to the south by Dayton Street, to the east by park/lawn areas and 8th Avenue South, and to the west by the Frances Anderson building. 4-o Field Investigation 4.1.1 Site Investigation Program The geotechnical field investigation program was. completed on June 9, 2015 and included excavating three hand borings near the location of the proposed amphitheater structure. The soils encountered were logged in the field and ar6 described in accordance with the Unified Soil Classification System (USCS). A Cobalt Geosciences field representative conducted the explorations, collected disturbed soil samples, classified the encountered soils, kept a detailed log of each hand auger hole, and observed and recorded pertinent site features. The results of the hand boring and sampling are presented on the boring logs enclosed in Appendix C. 5.o Soil and Groundwater Conditions 5A.1 Area Geology The site lies within of the Puget Lowland. The lowland is part of a regional north -south trending trough that extends from southwestern British Columbia to near Eugene, Oregon. North of Olympia, Washington, this lowland is glacially carved, with a depositional and erosional history including at least four separate glacial advances/retreats. The Puget Lowland is bounded to the west by the Olympic Mountains and to the east by the Cascade Range. The lowland is filled with glacial and non -glacial sediments consisting of interbedded gravel, sand, silt, till, and peat lenses. The Geologic Map of the Edmonds East and West 7.5 Minute Quadrangles, indicates that the site is underlain by Vashon Recessional Outwash. Vashon Recessional Outwash generally consists of loose to medium dense, fine to coarse grained sand with variable amounts of gravel and silt deposited during recession of continental glaciers approximately ii,000 years ago. Interbeds of silt and clay are locally common within the outwash deposits where ice dams created glacial lakes. 5.1.2 Soil Conditions Details of the encountered soil conditions are presented on the hand boring logs in Appendix C. The detailed soil description on these logs should be referred to in preference to the generalized description provided below. P.O. Box 82243, Kenmore, WA 98028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 Hand Borings HB-1 through HB-3 All of the hand borings encountered approximately 4 to 6 inches of grass and/or topsoil underlain by approximately 2 to 3 feet of loose, silty -fine to medium grained sand with gravel to poorly graded sand with gravel. These materials were underlain by loose to medium dense, fine to medium grained sand with variable amounts of gravel (Recessional Outwash), which extended to the termination depths of the hand borings. 5-1-3 Groundwater At the time of our investigation, groundwater was not encountered in any of the explorations. Based on the soil conditions and our knowledge of the area, we anticipate groundwater to be well below the proposed grading depths. Water table elevations often fluctuate over time. The groundwater level will depend on a variety of factors that may include seasonal precipitation, irrigation, land use, climatic conditions and soil permeability. Water levels at the time of the field investigation may be different from those encountered during the construction phase of the projecL 6.o Geologic Hazards 6.1 Erosion Hazard The Natural Resources Conservation Services (NRCS) maps for Snohomish County indicate that the site is underlain by Alderwood-Urban Land Complex (8 to 15 percent slopes). These materials have a "Slight" to "Moderate" erosion potential in a disturbed state. It is our opinion that soil erosion potential at this project site can be reduced through landscaping and surface water runoff control. Typically erosion of exposed soils will be most noticeable during periods of rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with regard to site grading, is from October 31' to April ist. Erosion control measures should be in place before the onset of wet weather. 6.2 Seismic Hazard The overall subsurface profile corresponds to a Site Class D as defined by Table 1613.5.2 of the 2012 International Building Code (2012 IBC). A Site Class D applies to an overall profile consisting of medium dense/stiff to very dense/hard materials within the upper wo feet. We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program Website to obtain values for Ss, S,, F., and F,,. The USGS website includes the most updated published data on seismic conditions. The site specific seismic design parameters and adjusted maximum spectral response acceleration parameters are as follows: P.O. Box 82243, Kenmore, WA 98028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 PGA (Peak Ground Acceleration, in percent of g) SS 127-00% Of 9 S, 49-80% Of 9 FA 1.00 Fv 1.50 7-o DISCUSSION 7.1.1 General It is our opinion that proposed amphitheater may be supported on shallow isolated or perimeter foundation systems bearing on re -compacted native soils or on structural fill placed on native soils per the recommendations in Section 8.1.1 and 8.1.4 of this report. Due to the proximity of the concrete retaining wall and anticipated wall backfill zone, we recommend that the new structure be located at least 4 feet east of the back of the concrete wall and that footings in this area have a minimum embedment Of 2.5 feet below existing site grades. Alternatively, or if the structure will be located closer than 4 feet from the existing concrete retaining wall, we recommend that the foundation elements for the new structure that are adjacent to the wall extend to the depth of the concrete retaining wall (or below). The foundation system for the new structure must not impose any loads onto the concrete retaining wall and a minimum iH: iV envelope should be maintained from the new foundation to the base of the existing wall. All excavations within the building footprint should be backfilled and compacted according to the recommendations in this report. Any filled areas beneath foundation elements should extend a lateral distance equal to the depth of the overexcavation in all directions from the faces of the footings. 8.o Recommendations 8.1.:t Site Preparation Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic -rich soil, Based on observa * tions from the site investigation program, it is anticipated that the stripping depth will range from 4 to 12 inches. The excavated material is not suitable as fill material within the proposed building envelope but could be used as fill material in non -settlement sensitive areas such as landscaping regions. In these non -settlement sensitive areas, the fill should be placed in maximum 12 inch thick lifts that should be compacted to at least go percent of the modified proctor (ASTM D 1557 Test Method) maximum dry density. The site soils consist of silty -sand with variable amounts of gravel and poorly graded sand with variable amounts of gravel and silt (outwash). These materials are generally considered suitable for use as structural fill provided they are within 3 percent of the optimum moisture content. It should be noted P.O. Box 82243, Kenmore, WA 98028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 ' that these materials are typically suitable for structural fill during the summer months and the fill soils should be considered moisture sensitive due to their fines content. Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be placed in maximum lift thicknesses Of 12 inches and should be compacted to a minimum Of 95 percent of the modified proctor maximum dry density, as determined by the ASTM D 1557 test method. Existing deeper foundation elements should be removed if they interfere with neW foundation placement. They may remain in place if they are outside of proposed development areas. 8.1.2 Temporary Excavations Based on our understandmig of the project, we anticipate that the grading could include local cuts on the order of approximately 4 feet or less for foundation placement. These excavations should be sloped no steeper than iH:iV (Horizontal:Vertical) in native soils. If an excavation is subject to heavy vibration or surcharge loads, we recommend that the excavations be sloped no steeper than 1.5H:iV, where room permits. Temporary cuts should be in accordance with the Washington Administrative Code (WAQ Part N, Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified per -son during construction activities and the inspections should be documented in daily reports. The contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope erosion during construction. Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the slopes should be closely monitored until the permanent retaining systems or slope configurations are complete. Materials should not be stored or equipment operated within io feet of the top of any temporary cut slope. Soil conditions may not be completely known from the geotechnical investigation. in the case of temporary cuts, the existing soil conditions may not be completely revealed until the excavation work exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines can be met. If any variations or undesirable conditions are encountered during construction, we should be notified so that supplemental recommendations can be made. If room constraints or groundwater conditions do not permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring systems may be required. The contractor should be responsible for developing temporary shoring systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review temporary shoring designs prior to installation, to verify the suitability of the proposed systems. P.O. Box 82243, Kenmore, WA 98028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 8.1.3 Erosion and Sediment Control Erosion and sediment control (ESQ is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented and these measures should be in general accordance with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site: • Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BMP's), grading activities can be completed during the wet season (generally October through April). • All site work should be completed and stabilized as quickly as possible. • Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. • Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. 8.1.4 Foundation Design The proposed amphitheater may be supported on a shallow spread footing foundation system or isolated column pads bearing on undisturbed medium dense or firmer native soils or on properly compacted structural fill placed on the suitable native soils. If structural fill is used to support foundations, then the zone of structural fill should extend beyond the faces of the footing a lateral distance at least equal to the thickness of the structural fill. We anticipate that local overexcavation or re -compaction of the upper I to 3 feet below proposed footing elevations will be necessary due to loose soil conditions. For shallow foundation support, we recommend widths of at least 18 and 24 inches, respectively, for continuous wall and isolated column footings supporting the proposed structure. Provided that the footings are supported as recommended above, a net allowable bearing pressure Of 2,000 pounds per square foot (psf) may be used for design. A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be inspected to verify that the foundations will bear on suitable material. Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. Interior footings should have a minimum depth Of 12 inches below pad subgrade (soil grade) or adjacent exterior grade, whichever is lower. If constructed as recommended, the total foundation settlement is not expected to exceed 1 inch. Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings, P.O. BOX 82243, Yenmore, WA C)8028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 should be less than 1/2 inch. This translates to an angular distortion Of 0.002. Most Settlement is expected to occur during construction, as the loads are applied. However, additional post -construction settlement may occur if the foundation soils are flooded or saturated. Resistance to lateral footing displacement can be determined using an allowable friction factor of 0.35 acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can also be developed using an allowable equivalent fluid passive pressure Of 300 pounds per cubic foot (pef) acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior areas). The allowable friction factor and allowable equivalent fluid passive pressure values include a factor of safety Of 1.5. The frictional and passive resistance of the soil may be combined without reduction in- determining the total lateral resistance. A 1/3 increase in the above values may be used for short duration transient loads. Care should be taken to prevent wetting or drying of the bearing materials during construction. Any extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing excavations, should be removed prior to placing concrete. The potential for wetting or drying of the bearing materials can be reduced by pouring concrete as soon as possible after completing the footing excavation and evaluating the bearing surface by the geotechnical engineer or his representative. 8-1-5 Slab -on -Grade We recommend that the upper 12 inches of the existing fill soils within slab areas (if proposed) be re - compacted to at least 9,5 percent of the modified proctor (ASTM D1557 Test Method). Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers. The American Concrete Institutes ACI 36oR-o6 Design of Slabs on Grade and ACI 302.IR-04 Guide for Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor slab detailing. Slabs on grade may be designed using a coefficient of subgrade reaction Of 200 pounds per cubic inch (pci) assuming the slab -on -grade base course is underlain by structural fill placed and compacted as outlined in Section 8.1. A perimeter drainage system is recommended unless interior slab areas are elevated a minimum Of 12 inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4 inch diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non -woven geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter drainage system should discharge by gravity flow to a suitable stormwater system. Exterior grades surrounding buildings should be sloped at a minimum of one percent. to facilitate surface water flow away from these buildings and preferably with a relatively impermeable surface cover immediately adjacent to the buildings. P.O. BM 82243, Kmmore, WA 98=8 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 8.1.6 Utilities Utility trenches should be excavated according to accepted engineering practices following OSHA (Occupational Safety and Health Administration) standards, by a contractor experienced in such work. The contractor is responsible for the safety of open trenches. Traffic and vibration adjacent to trench walls should be reduced; cyclic wetting and drying of excavation side slopes should be avoided. Depending upon the location and depth of some utility trenches, groundwater flow into open excavations could be experienced, especially during or shortly following periods of precipitation. In general, loose sandy native soils were encountered at shallow depths in the explorations at this site., These soils have variable cohesion and density and may have a tendency to cave or slough in excavations. Shoring or sloping back trench sidewalls is required within these soils. All utility trench backfill should consist of imported structural fill or suitable on site soils. Utility trench backfill placed in or adjacent to buildings and exterior slabs should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. The upper 5 feet of utility trench backfill placed in pavement areas should be compacted to at least 95 percent of the maximum dry density based on ASTM Test Method D1557. Below 5 feet, utility trench backfill in pavement areas should be compacted to at least go percent of the maximum dry density based on ASTM Test Method D1557. Pipe bedding should be in accordance with the pipe manufacturer's recommendations. The contractor is responsible for removing all water -sensitive soils from the trenches regardless of the backfill location and compaction requirements. Depending on the depth and location of the proposed utilities, we anticipate the need to re -compact existing fill soils below the utility structures and pipes, The contractor should use appropriate equipment and methods to avoid damage to the utilities and/or structures during fill placement and compaction procedures. 8.1.6 Groundwater Influence on Construction At the time of our investigation, groundwater was not encountered in any of the explorations. Based on the soil conditions and area geology, we do not expect groundwater to be encountered during construction at this site. 9.o Construction Field Reviews Cobalt Geosciences should be retained to provide part time field review during construction in order to verify that the soil conditions encountered are consistent with our design assumptions and that the intent of our recommendations is being met. This will require field and engineering review to: • Monitor and test structural fill placement and compaction • Observe overexcavation work for foundation elements • Verify the soil bearing at foundation locations for the building • Verify slab subgrade and capillary break material below slab -on -grade P.O. BOX 82243, Kenmore, WA 98028 LIMITED GEOTECHNICAL INVESTIGATION EDMONDS, WASHINGTON June 21, 2015 Geotechnical design services should also be anticipated during the subsequent final design phase to support the structural design and address specific issues arising during this phase. Field and engineering review services will also be required during the construction phase in order to provide a Final Letter for the project. mo Closure This report was prepared for the exclusive use of the City of Edmonds and their appointed consultants. Any use of this report or the material contained herein by third parties, or for other than the intended purpose, should first be approved in writing by Cobalt Geosciences. The recommendations contained in this report are based on assumed continuity of soils with those of our test holes, and assumed structural loads. Cobalt Geosciences should be provided with final architectural and civil drawings when they become available in order that we may review our design recommendations and advise of any revisions, if necessary. Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the responsibility of the City of Edmonds who is identified as "the Client" within the Statement of General Conditions, and its agents to review the conditions and to notify Cobalt Geosciences should any of these not be satisfied. Respectfully submitted, Cobalt Geosciences Original signed by: Phil Haberman, P.G., P.E.G. Principal Engineering Geologist PH/sc Original signed by: 6/21/15 Sean Caraway, P.E. Senior Geotechnical Engineer P.O. Box 82243, Kenmore, WA 98028 APPENDIXA Statement of General Conditions Statement of General Conditions USE OF THIS REPORT; This report has been prepared for the sole benefit of the Client or its agent and may not be used by any third party without the express written consent of Cobalt Geosciences and the Client. Any use which a third party makes of this report is the responsibility of such third party. BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are in accordance with Cobalt Geosciences present understanding of the site specific project as described by the Client. The applicability of these is restricted to the site conditions encountered at the time of the investigation or study. if the proposed site specific project differs or is modified from what is described in this report or if the site conditions are altered, this report is no longer valid unless Cobalt Geosciences is requested by the Client to review and revise the report to reflect the differing or modified project specifies and/or the altered site conditions. STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in accordance with the normally accepted standard of care in the state of execution for the specific professional service provided to the Client. No other warranty is made. INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and statements regarding their condition, made in this report are based on site conditions encountered by Cobalt Geosciences at the time of the work and at the specific testing and/or sampling locations. Classifications and statements of condition have been made in accordance with normally accepted practices which are judgmental in nature; no specific description should be considered exact, but rather reflective of the anticipated material behavior. Extrapolation of in situ conditions can only be made to some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock and groundwater conditions as influenced by geological processes, construction activity, and site use. VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be encountered that are different from those described in this report or encountered at the test locations, Cobalt Geosciences must be notified immediately to assess if the varying or unexpected conditions are substantial and if reassessments of the report conclusions or recommendations are required. Cobalt Geosciences will not be responsible to any party for damages incurred as a result of failing to notify Cobalt Geosciences that differing site or sub -surface conditions are present upon becoming aware of such conditions. PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications should be reviewed by Cobalt Geosciences, sufficiently ahead of initiating the next project stage (property acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated project specifies and that the contents of this report have been properly interpreted. Specialty quality assurance services (field observations and testing) during construction are a necessary part of the evaluation of sub -subsurface conditions and site preparation works. Site work relating to the recommendations included in this report should only be carried out in the presence of a qualified geotechnical engineer; Cobalt Geosciences cannot be responsible for site work carried out without being present. Figures: Vicinity Map and Site Plan P.O. Box 82243, Kenmore, WA 98028 -WASHINGTON Edmonds 0 ect 0 Location A REA IN.. z z b NMI. V" ugmt, �Iap —M� wth 122*24.000'W LZZ_zZ.uuv VV wkbt$14 izz_z1.uuu_ vv dctP z 0 8 6 th r, 5 z '0 ............. -Z 'th t w C__ CL e sr-=E­�--_ z ful FS TNV,�:N A NATIONAL ta up M §P �':GEOGRAPHIC 5 0 KROWTFRS 0 MUM 10M 06/21/15 VICINITYMAP P.O. Box 82243 Frances Anderson Center Amphitheater Kenmore, WA 98028 Edmonds, Washington Cobalt (2o6) 331-1097 FIGURE 1 Geos coMmeona junalcorn 2 - . - T111 C' S N ­j7 __�LU 11 2nd1SVSW -J�A M-M nd St w 122*22.000'W WGS84 12�-21.000' W CONCRETE WALK MAG NAIL TOP-500.0 ROW ELEV-520.65 P TOP OF BLOM WALL-L-__ EL.EV 517.72 ROOF ELEV­520.76_1�__ �Po f CONCRETE F�Au. 0 c ) VAP P TY'ICAL N T C /C.Nr 71UR., ONC.CURB 41j� 6' DECIDUOUS 'MEE Rv"' HB-3 Iwo- - - - - - - PlIp "--V61OOOE4 STACE ELEV-5-04.95 (AVE) is ORAII ROOF OUTILINE TOP-50pa HB-1 ROOF ELEV-521.13­1 —ROOF SUPPORt I -BEAU (TYP) 00 HB-2 IV ip C. CUR9 C.B.—O 10 AILE GRCAJI Ck TOP=499.61 kJ/ ,,,—SET MAC NA& 10 ELEVATION 500.00 (DATUM ASSUMED) .0 5"CHArN A� — — — — — — — — CONCRN7=- WAU .10 CCNCVL J� '.'.'A,L \1.4' CHAr,4 -^0\CRE_R. WAI.L -F,* 'MAIN HB-1 U\K FENCE LINK FENCE Not to Scwe :0� Approximate Hand Boring Location ME PLAN P.O. Box 82243 Frances Anderson Center Amphitheater Kenmore, WA 98028 Edmonds, Washington Cobalt (2o6) 331-1097 FIGURE 2 Geosc cobaltzeona gmail,com APPENDIX C Hand Boring Logs PROJECT: Frances Anderson Center WELL / PROBEHOLE / BOREHOLE NO LOCATION: 700 Main St, Ednwnds, WA PROJECT NUMBER: HB-1 PAGE I OF 1 DRILLING / INSTALLATION: NORTHING MY EASTING (ft): STARTED 6WIS COMPLETED: MIS LAT: LONG: GROUND ELEV (ft): TOC ELEV M; DRILLING COMPANY: INITIAL DTw (fty Not Encountered WELL DEPTH (ft): — DRILLING EQUIPMENT: Hand Auger STATIC DTW (11): Not Encountered BOREHOLE DEPTH (ft): 6.0 DRILLING METHOD: Hand Auger WELL CASING DtA. (in): — BOREHOLE DIA (in): 2 SAMPLING EQUIPMENT: Grab LOGGED BY: PH CHECKED BY: -q V) Description I. d Topsoil sP- tum- gra-ine-d -sai7nd-w-ith-gr-aviel -an-d S-ift SM yellowish brown, moist. 7 _fni- m6d e-d vJ sjtCrjje(TjUj� ��ns;j� I a fo Orig7raFn iaWdWh ri i, yellowish brown to grayish brown, moist. 5- Borehole terminated at 6 feet. PROJECT-. Frances Anderson Center WELL / PROBEHOLE / BOREHOLE NO LOCATION: 700 Main St., Urnonds, WA PROJECT NUMBER: HB-2 PAGE I OF 1 DRILLING I INSTALLATION: NORTHING (ft): EASTING (ft): STARTED 6MI15 COMPLETED: 61WIS LAT: LONG: DRILLING COMPANY: GROUND ELEV (11): TOC ELEV (11): INITIAL DTW (ft): Not Encountered WELL DEPTH (ft): — DRILLING EQUIPMEIiT: Hand Auger STATIC DTW My Not Encountered BOREHOLE DEPTH (1): 5.0 DRILLING METHOD: Hand Auger WELL CASING DIA. (in): — BOREHOLE DIA. (in): 2 SAMPLING EOUIPMENT: Grab LOGGED BY-. PH CHECKED BY: SC V . U) Description .2 CL E E AV 8 13 I- 09L Topsoil t-M,-Lo-os-e.-fi--fo-i-d-----a-iin ne m jurn grain SM yellowish brown, moist. &�,Io-ciii-tCrriWiuini�nsi. Wn-e Fo iReidiu-m-graFne7d iia -9ra-ve-1. yellowish brown to grayish brown, moist. Borehole terminated at 5 feet. PROJECT: Frances Andemn Center WELL / PROBEHOLE / BOREHOLE NO LOCATION: 700 Main St, Edmonds, WA PROJECT NUMBER: HB-3 PAGE 1 OF I DRILLING / INSTALLATION' NORTHING (ft): EASTING (ft): STARTED 619115 COMPLETED: WW15 LAT: LONG: GROUND ELEV (ft): TOC ELEV (ft): DRILLING COMPANY: INITIAL DTW (ft): Not Encountered WELL DEPTH (ft): — DRILLING EOUIPMENT: Hand Auger STATIC DTw (fty Not Encountered BOREHOLE DEPTH (ft): 6.0 DRILLING METHOD: Hand Auger WELL CASING DIA. (in): — BOREHOLE DIA. (in): 2 SAMPLING EQUIPMENT: Grab LOGGED BY: PH CHECKED BY: SC CO 0 U) Description I -d I j 1 0 I ej K i j- Topsoil -- H ---------------------------------- S - SP-SM; Loose, fine to medium grained sand with gravel and sift, SM yellowish brown, moist. sk - - - - - - - - - - - - - - - - - - - - s0�1-66ii-t6irie-6um Uin-ie-, fine to medium grained sand with gravel, yellowish brown to grayish brown, moist. 5- Borehole terminaFciU at 6 feet. 0 M E M 0 R A N D U M December 5, 1991 TO: Peter Hahn, Community Services Director VIA: Bob Alberts, City En eer FROM: Gordy Hyde, Engineering Coordinator SUBJECT: COUNCIL COMMITTEE MEETING OF NOVEMBER 12, 1991 The Engineering Division had three items of interest at the subject meeting. A summary of committee comments/decisions on those items. follows: 1. Revise parking at library Roger Hertrich-and Bill Kasper both questioned why we proposed exposed aggregate. I indicated that it was to present a contrast to the existing broomed finish sidewalk. Roger Hertrich commented that a three foot extension seemed excessive. He thought eighteen inches would be more appropriate. The committee approved the proposal. 2. 164th St. development requirements The committee members concurred with staff that improvements had to conform to street standards unless adjacent property owners applied for a street vacation. The committee recommended that the property owner at the end of the unopened right-of-way who wants to build a SFR could then.purchase the vacated right-of-way and develop it to driveway standards or street standards depending upon the level of development. 3. Parking lot at SR 104 and Dayton Roger Hertrich suggested that staff pursue Washington State Department of Transportation taking over the temporary parking lot for a one to three year time period. The.City would make a minimal contribution for -landscaping and relax requirements. The City would apply to have the conditional use permit transferred to WSDOT and would apply through the Department of Transportation to have the right-of-way permit extended. The parking would be no charge. There seemed to be a misunderstanding on the part of the committee of why this project -would have been dropped from the DOT plans for the SR 104 overlay and why the Marine Division was involved. GCH/sdt NOVCOMM.MTG/TXTST530 0 J�c PUBLIC Va.'s MAY, STREET USE PERMIT APPLICATION � 199, Date Received Date Issued ermit No. Name of Applicant or Business: Za Mailing Address: TO. �Bo-le _21Q, Telephone No: 7,71—WI;L Address of Public Use:_144"Aucnv9, &5f 1. DESCRIBE THE PUBLIC PLACE OR PORTION OF PUBLIC PLACE TO BE UTILIZED: ng-t- 49" z=aV&La4,1 6� IXA� AiLA, &7_1 Attach an appropriate plot plan or elevation view. 2. SPECIFY THE TYPE OF USE DESIRED: _rlu"A - 41- 3. SPECIFY LENGTH OF TIME FOR USE Z44- �.4kxbl- The issuance of this permit is understood by the applicant to be-lo, temporary nature and that no vested eight is granted. INDEMNITY: The applicant understands and by his signature to this application; agrees to hold the City of Edmonds harmless from any inju.ries, damages or claims of any kjnd or , description whatsoever, foreseen or -unforeseen, that'*may bd made ag'�tns"t the applicant or the City of Edmonds, or any of if!�'departments or employees, including but not limited to the defense or any legal proceedings including defense.. costs, courtrosts, and attorney fees by reason of granting this permit. In addition the applicant understands that the City shall be. provided a certificate of insurance to indemnity and hold harmless the City of Edmonds from all claims and/or property damage, and naming the City of Edmonds as an additional insured. CODE APPLICATION: By signing the application below the applicant warrants.that s/he has read or had the opportunity to read Chapter 18 of the Edmonds Community Development Code, and s/he understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that Chapter. ppl i cant SAgwMre te Page 6 of 8 1/89 Street Use Permit Application Page Two SIGNATURE OF APPROVAL FROM ABUTTING PROPERTY OWNERS When applicable;,if the street use proposal is for utilization of City right-of-way that may directly impact any adjacent business or private property owners, the applicant shall -obtain written approval from the neighbors. (This requirement will be evaluated by the City after initial submittal -of the permit has been made by the applicant.) SIGNATURE PRINTED NAME ADDRESS DATE DO NOT WRITE BELOW THIS LINE FOR CITY USE ONLY City Council Approval Date , - ADB Approval Date Certificate Of Insurance Posted . Bond Required, SIGNATURES'OF,PERMIT APPROVAL.FOR'ISSUANCE Fi re Department Da te H - ct- Police Department Date L/ Engineering Dept Date S--- Building Official Date S-16 Public Works Date REMARKS/COMMENTS: PERMIT NO. 9/- / -DATE OF RELEASED BrJ. 2yded::2&_ RECEIPT BUILDING PERMIT NO. Page 7 of 8 1/89 ISSUANCE NO. IVY911140 9 L A l ISSUE DATE (MM/DD/YY) CERTIFICATE OF INSURANCE,_. t/11/91 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EX- TEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW REDMOND GENERAL INS & SMITH MARTIN LEWIS INC COMPANIES AFFORDING COVERAGE P 0 BOX E147 REDMOND WA 78073 COMPANY LETTER A U S F & G CODE SUB -CODE COMPANY B INSURED LEITER EDMONDS ART FESTIVAL COMPANY MUSEUM LETTER C C/O 19?18 88TH AVE W COMPANY EDMONDS WA 9802C-11 LETTER D COMPANY E LETTER COVERAGES, THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD IN- DICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CER- TIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLU- SIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Co LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE DATE (MM/DDIYY) POLICY EXPIRATION DATE (MMIDD/YY) .e ALL LIMITS IN THOUSANDS GENE �At_ AGGZ�WE Ji- 0 Z' - -�E;�RAL LIABILITY COMMERCIAL GENERAL LIABILITY PRODUCTS - COMPIOPS AGGREGATE 2, 000 7 CLAIMS MADE Fj OCCUR. PERSONAL & ADVERTISING INJURY 1,0(--)() OWNER'S & CONTRACTOR'S PROT. EACH OCCURRENCE 1. , ono FIRE DAMAGE (Any one fire) 50 MED. EXPENSE (Any one person) AUTOMOBILE LIABILITY COMBINED ANY AUTO SINGLE LIMIT ALL OWNED AUTOS BODILY SCHEDULED AUTOS INJURY (Per person) HIRED AUTOS BODILY NON -OWNED AUTOS INJURY (Per accident) GARAGE LIABILITY PROPERTY DAMAGE EXCESS LIABILITY EACH AGGREGATE OCCURRENCE OTHER THAN UMBRELLA FORM WORKER'S COMPENSATION STATUTORY (EACH ACCIDENT) AND (DISEASE — POLICY LIMIT) EMPLOYERS LIABILITY (DISEASE — EACH EMPLOYEE) OTHER DESCRIPTION OF OPERATIONSfLOCATIONSIVEHICLES/SPECIAL ITEMS CERTIFICATE HOLDER IS ADDITIONAL INSURED AS RESPECTS LEASE OF PREMISES AT 70o MAIN STREET EDMONDS WA TIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO CITY OF EDMONDS-LINDA MCCRYSTL-" MAIL I MAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE FRANCES E ANDERSON CENTER LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO 013LIGATION OR 700 MAIN STREET LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. EDMONDS WA 98020 AUTHORIZED REPRESENTA71VE WALTER E BREWE CPCU M cc 2 a: 0 Q a cc 0 n. Edmonds Arts Festival April 10th, 1991 Dear Neighbor of the Arts Festival, Our plans are well under way for the 1991 Edmonds Arts Festival which will be the weekend of June 14, 15 and 16 Once again this year the Mayor and City Council have approved our plans to close 8thAvenue south between Main andDayton during thefestivalfor theplacement of food booths and seating. We will be closing 8th Avenue fiom Thursday, June 13th through Sunday June 17th. The entrance - to the alley from 9th Street will be marked 'Local Access Only" and will be available for use by residents.only. We appreciate your patience, and urge you to call me if you have any questions or wish to talk with me further. Please leave a message for me at 771-6412, and I will return your call We hope you enjoy the festival and appreciate your support and understanding. Please don't hesitate to call if any problems arise during the festival. Thank you again for your understanding, Best Regards, qx4x- - Pam Inness, President Edmonds Arts Festival 7P-0. Box 212, Edmonds, Washington 98020 CONTRACT CITY OF EDMONDS, WASHINGTON AND EDMONDS ARTS FESTIVAL AS * SOCIATION, INCORPORATED 'Al - March 1, 1991 rly �ry 29, 1992 The following is an Agreement between the CITY OF EDMONDS (hereinafter referred to as the "CITY"), and the EDMONDS ARTS FESTIVAL ASSOCIATION, INCORPORATED (hereinafter referred to as the "FESTIVAL ASSOCIATION"). 1. Responsibilities of the CITY. The CITY shall pro . vide: 1.1 A meeting room, for forty (40) people on t , he first Wednesday of each month, from 7,:00-9:30 p.m., except during July, August, September and December (March 6, April 3, May 1, and June 5, October 2, November 6, 1991 and January 8, and February 5, 1992). The FESTIVAL ASSOCIATION is responsible 'for setting up and taking down chairs and tables for the meeting,' if necessary. 1.2 Rooms 206, 207 and 208 (or other suitable space in the Frances Anderson Center) on the first'lthree Saturdays of March (March .2, 9, 16, 1991) from 7:30 a.m. to`!8"�OV`m. Four hundred (400) artists will be screened during these three diays. City staff will set up eight (8) tables and thirty (30) chairs in Room 207 on the above mentioned dates. The FESTIVAL ASSOCIATION will be responsible for the taking down of cha irs and tables and cleaning up after the screening. The Festival Director in charge will sign the use permit and check out keys on Friday, March 1, 1991. 1.3 From June 7 through June 18, 1991, the following rooms or areas in the Anderson Center (indicated by shading on the attached plan): 1.3.1 Room 301 will be utilized by the CITY to store equipment and furniture displaced by the FESTIVAL ASSOCIATION. The FESTIVAL ASSOCIATION will provide manpower to assist relocating CITY equipment and furniture to storage rooms. Also, CITY clients will have access to the weight room (200A).­ for drop -in use up until noon, Thursday, June 13, 1991, and startingagain at 8:00 a.m., Monday, June 17, 1991. They will use the alter6at e*.Main Street entrance (no access through the gym); the CITY Wilji;�`,'secure the hallway between the gymnasium and the weight room; the�'',;' ha�llway must be cleared during the Festival. C -1 1.3.2 In addition, the Library Plaza and the Plaza Meeting Rooms shall be provided from 8:00 a.m., Thursday, June 6, until midnight Monday, June 17, 1991. 1.3.3 All of the above -mentioned rooms shall be under the exclusive control of the FESTIVAL ASSOCIATION during this period due to the high value of the arts and crafts works that will be located therein. Although there is not a problem of the hallways being used during this period (with the exception listed 1.3.4), the FESTIVAL ASSOCIATION requests that the CITY limit people traffic not related to the FESTIVAL ASSOCIATION to a minimum. All required keys will be checked out to the FESTIVAL ASSOCIATION President, or designee, who will be responsible for locking/u.nlocking rooms and security of all FESTIVAL ASSOCIATION displays and supplies. The Festival may cover the vending machines from 12:00 noon, June 13, through June 16, 1991. 1.3.4 During the night of June 13, 1991, the FESTIVAL ASSOCIATION shall have exclusive control of the above -mentioned rooms and all hallways starting at 6:00 p.m. During this time the FESTIVAL ASSOCIATION shall hold the Annual Patrons' Preview from 6:00 p.m. to 12:00 midnight. Alcoholic drinks will be served at the Patrons' Preview. The lighted display case will be reserved to advertise the "Run for the Arts" during the hours of the Patrons' Preview, if requested. The CITY will provide ample, trash cans for the evening of June 13, 1991. 1.3.5 All outdoor surface.s, to the east and west of Anderson Center from 8:00 a.m., June 1.2 throughi5:00 p.m., June 18, 1991. The playfield will be provided for Artists in Action. The FESTIVAL ASSOCIATION shall have the exclusive use of the playfield and baseball diamond from 12:00 noon, June 12, 19911.1 The CITY's field liner shall be reserved for the Festival's use on,June 12, 1991. It is recognized that the CITY may choose to sprinkle the field prior to the Arts Festival to reduce dust as watering the field is the only means the CITY has to control dust. It is re�cognized that the sprinkling system sha 11 be tu rned of f by 8: 00 a. in. :,�,�Iu:'ne 12, 199 1. In addition to the playfield, the FESTIVAL ASSOC IAT I ONj�W'�Iha I I be provided the paved area west of the outdoor stage for the�:If66d concession area. The Library Plaza to the west of the Anderson.,f,,*(:Ce9ter shall be used for special functions suitable to the area. The"FESTIVAL ASSOCIATION will utilize 2. and shall be provided about fifteen (15) picnic tables at the concession area and about (15) garbage cans around the outside area and will provide the CITY with a schematic drawing of where they are to be placed. The FESTIVAL ASSOCIATION will be responsible for providing a dumpster for trash. The CITY will provide the supply of trash can liners and the FESTIVAL ASSOCIATION will be billed for the cost of liners. The CITY will check the stage to insure that it is in safe and repaired condition. 1.3.6 Eighth Avenue will be closed between Main Street and Dayton Street for an additional' food concession area and eating tables. This area is required from 8:00 a.m., June 13, through 12:00 noon, June 17, 1991. The CITY':,,shall provide and install safety barriers at both ends of the closed street. The FESTIVAL ASSOCIATION shall obtain a street closure permit as -a part of its obligations under paragraph 2.4. 1.3.7 The FESTIVAL ASSOCIATION will have exclusive use of the one parking lot between the Anderson Center and the Edmonds Library for permit parking from June 14, through June 16, 1991, but allow handicap permit parking in marked stalls. One load/unload space each will be marked on Dayton Street and Main Street, and up to two spaces on 8th Avenue. 1.4 The CITY shall install Festival street banners at all approved sites. The FESTIVAL ASSOCIATION shall fill out Street Banner Permit with fees provided for by' this agreement. Four (4) additional banners (Plaza, east wall of Frances Anderson Center, between fir trees on ramp and stage backdrop) will be installed by CITY. 1.5 The CITY shall provide fifteen (15) amps of electrical service to, each duplex outlet; any additional power must be supplied by the FESTIVAL ASSOCIATION. A FESTIVAL ASSOCIATION representative and a CITY representative from Public Works will meet prior to June 6, 1991, to draw up an interior and exte * rlbr.' electrical plan. The FESTIVAL ASSOCIATION is responsible for ndtlf�ij�g P.U.D. of hookups and schedule inspection of temporary panels. 1.6 The CITY wi 11 provilde', the FESTIVAL ASSOCIATION wi th - two dollies to use which should prevent., any damage from moving heavy objects. ,3. 2.6 The FESTIVAL ASSOCIATION shall provide a fire watch for all times the buildings and displays are open to the general public. The CITY Fire Marshal will inspect the Anderson Center with the FESTIVAL ASSOCIATION President, representative, prior to ,jqo.�,�i,gnated June 7, 1991, and any potential!J,41� ill be noted. At 9:00 a.m., o'b I ems, w June 14, 1991, the Fire Marshal,, w1i'l 1 brief designated representatives of the FESTIVAL ASSOCIATION of the location and use of fire apparatus in the Anderson Center and. Library Plaza Rooms. The FESTIVAL ASSOCIATION President and appointed representatives will be the responsible FESTIVAL ASSOCIATION ind ividuals for fire prevention and fire watch. 2.7 The FESTIVAL ASSOCIATION shall insure that: 2.7.1 Kilns, barbecues, forges, and other sources of heat shall be insulated from turfed areas to prevent the heat from killing the grass and sterilizing the soil. 2.7.2 Vehicles will only be allowed on turfed areas to load and unload, with adjacent streets used for parking during the Arts Festival. Food Court concessions will use the Main Street entrance for loading and unloading. The FESTIVAL ASSOCIATION will notify all individual residents of the affected areas of 8th Avenue and provide general notice to all the ci ti zens at least two months in advance of the closure of 8th Avenue. 2.8 The FESTIVAL ASSOCIATION will consider the Anderson Center tenants and Edmonds Parks *.and Recreation instructors for inclusion in the Performing Arts Ovents of the Arts Festival. 2.9 The FESTIVAL ASSOCIATION shall submit a cleaning/damage deposit of $1,000.00 to the CITY prior to June 7, 1991. The deposit will be refunded to the FESTIVAL ASSOCIATION if, upon inspection, all is in order, or a prorated portion thereof as may be necessary to reimburse the CITY for loss or cleaning costs. 2.10 The FESTIVAL ASSOCIATION will pay the CITY a fee of $1,000.00 for the use and services��,,,�'of' the above -mentioned facilities in this Contract, and shal I reimburse" the CITY for the actual costs of supplies furnished by the CITY within'thirty (30) days of mailing of a final bill by the CITY. 'r'equelsts 3. Notices. All for additional services and I ItT t concerns of the FESTIVAL ASSOCIATI:ON.�§hall be directed by the FESTIVAL ASSOCIATION President to the CITY"s designated representative, Linda McCrystal. 0 0 ATTEST: .-CITY OF EDMONDS =rU_ -of -04F 4 4City Clerk Date 111�1:;�M D a't e APPROVED AS TO FORM: Cit6r Attorhe Date EAFCONT.RAC/TXTADMIN EDMONDS ARTS FESTIVAL ASSOCIATION President Date 0 :A—h STAEf7 EDMONDS ARTS FESTrVAL Frances E. Anderson Center - Edmonds. Washington Md' -6t j7 7- �30j,30-32-2a -3- 5:.16, Wi7r ... .. ..... '92 94 45 so 49 '0 ?.:,2. C-ILDREM'S Ll PLAZA 65 6- 63 42 %1 60:59 5. 56 SS454 53 ?! am As )o' 3,; 32 33 3-.35 36:3,3.1 .0, 77- 1 :5 2 2 j 7 1 2, 70! -9: .1 16. 13 1- 13:12 1 -1 0 1 -05C G—CE� FF=�Jz .A-% r%T-Z% C E .AIN ST-EE S , i �CAD4,6 NOE- S% ENTER �^,. L,y f", f, le z 0 1 LLIJ -L 0 , f /7 4FIV 00 STREET USE PERMJqr4ICATION eived u e d i 3N Permit No. 89-9 Name of Applicant or Business: 5,VM0QV5,, AZT5 V:F,,F7TlV^L-- Mailing Address: P-0, 50y- VIL Telephone No: -774-- 4a+12- Address of Public Use: -100 MAIO sTaEST 1. DESCRIBE THE PUBLIC PLACE OR PORTION OF PUBLIC PLACE TO BE UTILIZED: 5E;We�W_ t-,AAW A�Qo DAYTOK) Attach an appropriate pTot plan or elevation view. 2. SPECIFY THE TYPE OF USE DESIRED: IS-M. FA- 3. SPECIFY LENGTH OF TIME.FOR USE 16 AM j J00F, 15 000K) The issuance of this permit is understood by the applicant to be of a temporary nature and that no vested right is granted. -)u ME I'l, . leVa-1 INDEMNITY: The applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or description whatsoever,. foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its departments or employees, including but not limited to the defense or any legal proceedings including defense costs, court costs, and attorney fees by reason of granting this permit. In addition the applicant understands that the City shall be provided a certificate of insurance to indemnity and hold harmless the City of Edmonds from all claims and/or property damage, and naming the City of Edmonds as an additional insured. CODE APPLICATION: By signing the application below the applicant warrants that s/he has read or had the opportunity to read Chapter 18 of the Edmonds Community Development Code, and s/he understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that Chapter. A. Mtda tmve-1 Ra aeA- ignature te Page 6 of 8 1/89 Street Use Permit Application Page Two SIGNATURE OF APPROVAL FROM ABUTTING PROPERTY OWNERS When applicable; if the street use proposal is for utilization of City right-of-way that may directly impact any adjacent business or private property owners, the applicant shall obtain written approval from the neighbors. (This requirement will be evaluated by the City after initial submittal of the permit has been made by the applicant.) SIGNATURE PRINTED NAME ADDRESS DATE DO NOT WRITE BELOW THIS LINE FOR CITY USE ONLY City Council Approval Date ADB Approval Date Certificate Of Insurance Posted Bond Required SIGNATURES OF PERMIT ARPROV-AL FOR IS30ANCE Fire Department Date Police Department Date Z-/�' �7 Engineering Dept 44, e4-�� —Date -/x Building Official —Date (e Z. Public Works Date to - @L- REMARKS/COMMENTS: PERMIT NO. -9 DATE OF ISSUANCE RELEASED BY RECEIPT NO. BUILDING PERMIT NO. Page 7 of 8 1/89 CONTRACT CITY OF EDMONDS, WASHINGTON AND EDMONDS ARTS FESTIVAL ASSOCIATI'ON, INCORPORATED March 1, 1989 - February 28, 1990 The following is an Agreement between the CITY OF EDMONDS, hereinafter referred to as the City, and the EDMONDS ARTS FESTIVAL ASSOCIATION, INCORPORATED, hereinafter referred to as the Festival Association . - 1. The City will provide a meeting room for forty (40) people on the first Wednesday of each month, from 7:00- 9:30 p.m., except during July, August, September, and December (March 1, April 5, May 3, and June 7, October 4, November 1, 1989 and and January 3, and February 7, 1990). The Festival Association is responsible for setting up and taking down chairs and tables for the meeting, if necessary. 2. Rooms 206 and 207 (or other suitable space in the Frances Anderson Center) will be needed on the first three Saturdays of March (March 4, 11, 18, 1989) from 7:30 a.m. to 8:00 p.m. Three hundred (300) artists will be screened during these three days. Eight (8) tables, six (6) easels, and thirty (30) chairs will be needed for Room 207 on the above mentioned dates. The Festival Association will be responsible for the setting up and taking down of chairs and tables and cleaning up -after screening. The Festival Director in charge will sign the use permit and check out keys on Friday, March 3, 1989. 3. Room 208 (or other suitable space) will be needed on June 6, 1989, from 7:30 to 9:00 p.m. for a training session of Festival hostesses- 4.a. From June 9 through June 20, 1989, the following rooms in the Anderson Center (indicated by shading on the attached plan).will be required. As in prior years, Room 301 is needed by the City to store equipment and -furniture displaced by the Festival Association. The Festival Association will.provide manpower to assist relocating City equipment and furniture to storage rooms. Also, City clients will have access to the weight room (200A) for drop -in use up until noon, Thursday, June 15, 1989, and starting again 8:00 a.m., Monday, June 19, 1989. They will use the alternate Main Street entrance; the City will secure the hallway between the gymnasium and the weight room; the hallway must be cleared during the Festival. I 4.b. In addition, the Library Plaza and the Plaza Meeting Rooms are requested from 8:00 a.m., Friday, June 9, through midnight -Monday, June 19, 1989. 4.c. All of the above mentioned rooms will be under the exclusive control of the Festival Association during this period due to the high value of the arts and crafts works that will be located 1 . I 0 therein. Although there is not a problem of the hallways being used during this period (with.the one exception listed in 4.d.), the Festival Association wishes people traffic not related to the Festival Association to be kept to a minimum. All required keys will be checked out to the Festival Association President, or designee, who will be responsible for locking/unlocking rooms and security of all Festival Association displays and supplies. The Festival may cover the vending machines from 12:00 Noon, June 15, through June 18, 1989. 4.d. During the night of June 15, 1989, the Festival Association must have exclusive control of the above -mentioned rooms and the main hallway from the Main Street Entrance (north) and the lower hallways (except south). During this time the Festival Association wi'll hold the Annual Patrons' Preview from 6:00 p.m. to 12:00 midnight. Alcoholic drinks will be served at the Patrons' Preview. The lighted display case will be reserved to advertise the "Run for the Arts" during the hours of the Patron's Preview, if requested. The City will provide ample trash cans for the evening of June 15, 1989. 4.e. The Festival Association is responsible for all permits and security needed for the Arts Festival activities, and the Anderson Center's common areas on the first ' main, and third floors, and rented rooms from 12:00 noon, June 15, 1989, through 12:00 midnight June 19, 1989, including the Library Plaza. 4.f. All outdoor surfaces to the east and west of Anderson Center will be required from June 15 through 5:00 p.m." June 20, 1989. The playfield will be required for Artists in Action. The Festival Association requires the exclusive use of the playfield and baseball diamond from 12:00 noon., June 14, 1989. The City's field liner will be reserved for the Festival's use on June 14, 1989. It is recognized that the City may choose to sprinkle the field prior- to the Arts Festival to reduce dust as watering the field is the only means the City has to control dust. It is recognized that .the sprinkling system must be turned off by 8:00 a.m., June 14, 1989. In addition to the playfield, the Festival Association requires the paved area east of the outdoor stage for the performing arts, and the paved area west of the outdoor stage for the food concession area. The basketball hoops will be taken down by the City by 8:00 a.m., June 14, 1989. The Library Plaza to the west of the Anderson Center will be used for special functions suitable to the area. The Festival Association requires about fifteen (15) picnic tables at the concession area and about fifteen (15) garbage cans around the outside area and will provide the City with a schematic drawing of where they are to be placed. The Festival will be responsible for providing a dumpster for trash. The City will provide the supply of trash can liners* and the Festival will be billed for the cost of the liners. 2. 4.9. Eighth Avenue will be closed between Main Street and Dayton Street for an additional food concession area and eating tables. This area is required from 8:00 a.m'., June 15, through 12:00 noon, June 19, 1989. The City will provide and install safety barriers at both ends of the closed street. The Festival Association will obtain street closure permit with fees included in this contract. 4.h. The City will install Festival street banners at all approved' sites. The Festival Association will fill out Street Banner Permit with fees included in this contract. 5. The Festival Association covenants and agrees to obtain a liability insurance policy with a minimum public liability coverage of $1,000,000, and $50,000 for property damage for the period stated in this Contract (June 9, through June 20, 1989). A copy of this policy shall be submitted to the Parks and Recreation Division prior to June 9, 1989. 6. Displays and artworks cannot be hung from conduits or sprinkler pipes. The Festival Association will be responsible for removing all paint, wires, and modifications made to the building for the Arts Festival. The Festival may use the battens and rigging in the gym to hang banners. 6.a. The Festival Association will be responsible for picking up all trash and removing all items and equipment related to the Arts Festival Association. This includes the grounds as well as the buildings. The City will provide the Festival with one mop, pail, and broom to use for cleanup, supplies for the toilet facilities, and a key to the dispenser. The Festival Association will provide sufficie.nt portable sani-cans and wash stations. 6.b.- The Festival"Association will be responsible for cleaning rugs, floors, stairs, and restoring the buildings to their original condition. The Festival Association will pay for special cleaning of both paved food concession areas and restore them to their original condition. Disposal of waste water will be according to City policy. 7. A Festival Association representative will meet with a member of the City's Parks and Recreation Department prior to June 9, 1989 and on June 20, 1989 to inspect the facility so that there is agreement between the City and the Festival Association as to the condition of the Anderson Center, the Plaza Rooms, and outside areas. 8. The Festival Association will provide a fire watch for all times the buildings and displays are open to the general public. The City Fire Marshal will inspect the Anderson Center with the - Association President, or designated representative, prior to June 9, 1989, and all potential problems will be noted.- At 9:00 a.m., June 16, 1989, the Fire Marshal will brief selected individuals of the Festival Association of the location and use of fire apparatus in the Anderson Center and Library Plaza Rooms. The Association President and appointed representative will be the responsible Festival Association individuals for fire prevention and fire watch. 3. 9. Kilns, barbeques, forges, and other sources of heat shall be insulated from turfed areas to prevent the heat from killing the grass and sterilizing the soil. Vehicles will only be allowed on turfed areas to load and unload, with adjacent streets used for parking during the Arts Festival. The Festival Association will have exclusive use of the one parking lot between the Anderson Center and the Edmonds Library for permit parking from June 16, through June 18, 1989, but allow handicap permit parking in marked stalls. One load/unload space will be marked on Dayton Street and Main Street, and up to two spaces on 8th Avenue. 10. The Festival Association will cons ' ider the Anderson Center tenants and Edmonds Parks and Recreation instructors for the Performing Arts events of the Arts Festival. .1 11. The City will provide fifteen (15) amps of electrical service to each duplex outlet; any additional power must be supplied by the Festival Association. A Festival representative and a City representative from Public Works will meet prior to June 8, 1989, to draw up an interior and exterior electrical plan. 12. The Edmonds Parks and Recreation Division and Public Works Div.ision will cooperate in all things and will give as much assistance as- the Divisions' resources permit to make the Arts Festival a success. 13. All requests for additional services and concerns of the Festival Association shall be directed by the Festival Association President to the City's representative, Linda McCrystal. 14. A cleaning/damage deposit of $1,000.00 shall be submitted to the City of Edmonds prior to June 9, 1989. The deposit will be refunded to the Festival Association if, upon inspection, all is in order. The City will provide the Festival with two dollies to use which should prevent any damage from moving heavy objects. 15. The Festival Association will pay the City of Edmonds a fee of $1,000.00 for the use and services of the above -mentioned facilities in this Contract, plus costs of supplies furnished by'the city. 4. � 0 0— ATTEST: CITY OF EDMONDS "'Citf Clerk Date Difte-7 APPROVED AS TO FORM: 312- IM CUT-9—fto rney DAte ARTSFEST/TXTARTS EDMONDS ARTS FESTIVAL PresicLefit Date 5. 0 0 0 0 0 0 0 EDM s IVAL C�440 gdwmnda. Was"lon .. .. ....... m 6+w ?LAZA CTM"cs :c PLAZA WO&OW Acc" 9:vo&"C, W&M STPCCT ft"aso c c"VIII, TA414P FLOPOK- 7.1 YV----X X---K =3 r---3 C= C-1 z A 0 00 v 0 rt U� ro I Li 00 0 zt C=3 MAI N 3-r ALLC-%/ m DAYTO-N rT- CERTIFICK, PRODUCER *ITH, MARTIN & LEWIS, INC. 750-3rd Avenue N.E., Suite 306 Seattle, Washington 98115 �(206) 527-5290 CODE SUB -CODE INSURED EDMONDS ART FESTIVAL MUSEUM c/o Ruth Meyers 9222 Sierra Street Edmonds, Washington 98020 NINSURANCE, ISSUE DATE (MM/DD/YY) 1/11/89 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW COMPANIES AFFORDING COVERAGE COMPAN LETTER A UNITED STATES FIDELITY & GUARANTY COMPANY COMPAN LETTER B COMPANY c LETTER COMPAN LETTER D COMPAN LETTER E COVERAGES, % THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Coi TYPE OF INSURANCE POLICY NUMBER 2 LTR: POLICY EFFECTIVE POLICY EXPIRATION, ALL LIMITS IN THOUSANDS DATE (MM/DD/YY) DATE (MM/DD/YY) GENERAL LIABILITY GENERAL AGGREGATE s 2,000 A :Fk COMMERCIAL GENERAL LIABILITY:� PRODUCTS-COMPIOPS AGGREGATE�: s 2,000 CLAIMS MADE X OCCUR.� 1CC090-151523 1-20-89 1-20-90 PERSONAL & ADVERTISING INJURY $ 1 , 000 OWNER'S & CONTRACTOR'S PROV EACH OCCURRENCE $ 1,000 FIRE DAMAGE (Any one fire) 50 $ I ME DICAL EXPENSE (Any one person): $ 5 COMBINED SINGLE $ ANY AUTO LIMIT ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON -OWNED AUTOS i (Per accidentj GARAGE LIABILITY PROPERTY DAMAGE EXCESS LIABILITY I EACH AGGREGATE OCCURRENCE; $ $ OTHER THAN UMBRELLA FORM WORKER'S COMPENSATION AND EMPLOYERS' LIABILITY OTHER STATUTORY $ (EACH ACCIDENT) $ (DISEASE -POLICY LIMIT) $ (DISEASE -EACH EM - PLOYEEI DESCRIPTION OF 0 PE RATIO NS/LOCATIO NSIVEHICLESIRESTRI CTIONS/SPECIAL ITEMS Certificate Holder is named as Additional Insured as respects lease of premises at 700 Main Street, Edmonds, Washington 98020 CERTIFICATE HOLDER CANCELLATION CITY OF EDMONDS SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE 9 Linda McCrystal EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO n'derson Center MAIL TEN DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE 700 Main Street LEFT, BUT FAILURE TO MAIL SUCH NOT;IC;E SH L IMPOSE NO OBLIWTION OR LIABILITY OF ANY KIND UPON THE COMP #AGENTS QQ"P NTATIVES. Edmonds, WA 98020 .011! 01= ACORD 25-S (3/88) AUTHORIZED REPRESENTATIVE Walter E. Brewe, CPCU eviotrIc- CACORD-CORPORATION79881 CITY F EDMONDS D TE RECEIVED COMMUNITY SERVICES DEPARTMENT 250 5th Ave N DATE ISSUED 771-3202 L5PERMIT NO._ LJ 7 APPLICATION FOR STREET USE PERMIT Name of Applicant: Z-1Q1k,40A1,V_r Mailing Address: 794- '/A_ E4-/1 2�-i t - Telephone Number: 776 -,,7-,6 6 Date: � �—F 044144C�7 Description of Public Place or Portion thereof desired to be used: (exhibit m y be attached) y 4;W7 ype of Use desired mad of Public Place: e- OA-4 0 AJOS r45;:777�-�Aj,, 4 c— If applicable, attach plans and specifications for any util t or structure to be erected and/or maintained on the Public Place: 10, TEMPORARY PERMIT: Unless otherwise designated herein, this permit is understood by applicant to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes dangerous or such structure shall become insecure or unsafe or shall not be constructed, maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered.removed by order of the City Engineer. If th.is application is for a specified 0, d f time, the terms of said application is: INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the applicant or the City of Edmonds, or any of its department or employees, including but not limited to the defense or any legal proceedings including defence costs, court costs, and attorney fees by reason of granting this permit. In addition, applicant understands that the City shall -be provided a certificate of insurance to indemnify and hold the City of Edmonds harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 18.70 OF THE COMMUNITY DEVELOPMENT CODE: Applicant warrants that he has read, or had the opportunity to read, Chapter 18.70 of the Community Development Code, attached herewith, and understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that Chapter of the Edmonds City Code. pplicant's §i ri-ature Ddte 1.14 City of Edmonds, Community Services Department APPLICATION FOR STREET USE PERMIT - - Page 2 0 Approval (and Agreement, if applicable) of Abutting Property Owners: SIGNATURE PRINTED NAME ADDRESS DAT E DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (ff applAtable) (Attach Minute Entry): 20—Ol/ �02W ADB Approval (if applicable) (Attach Minute Entry): .1VdrAA0111111?z4 i-/�; 4�nz Building Official Approval (if applicable): 6,-Signature Date Provision for Indemnity: 0 Terms and Provision of Performance Bond, if applicable: PERMIT AUTHORIZATION BY: Mr. ksm�=On PERMIT NO. ?7'7-- Date Issued : jO�zp Permit Fee: &'er- t "'11V4D RELEASED BY JZ6 RECEIPT NO. BUILDING PERMIT # IP14 Remarks/Comments: FIRE DEPARTMENT APPROVAL POLICE DEPARTMENT APPROVAL ENGINEERING DEPARTMENT APPROV E DATE PATE 1 —141 PATE e7 CITY OF EDMONDS COMMUNITY SERVICES DEPARTMENT 0 250 5th Ave N 771-3202 AN, 04-1987 APPLICATION FOR STREET USE PERMIT PUBUC WORKS DATE RECEIVED____j1&ZJ87 DATE ISSUED & 11-7 /'9-7 PERMIT NO. P-5- Name of Applicant: )ee� A-zle-N-1V414--5- Mailing Address: /;1 41t) '57-- Telephone Number: 3 o'3-5' Date: Description of Public Place or Portion thereof desired to be used: (exhibit may be attached) Type of Use desired to be made of Public Place: wv/v IQ4 01 20, /ff 4,100 7 Itn /29 11'0941 If applicable, attach plans and specifications for any�utility or structurell"'Z,,, be erected..and/or maintained on the Public Place: TEMPORARY PERMIT: Unless otherwise designated herein'. this permit' is understood by applicant to be wholly of a temporary nature, that it vests no permanent right whatsoever. If the permitted use becomes dangerous or such structure shall become insecure or unsafe or shall not be constructed, maintained or used in accordance with the provisions of this title, the same may be revoked and the structure and obstructions ordered removed by order of the City Engineer. If th.is application is for a specified period of time, the terms of said application is: INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City of Edmonds harmless from any injuries, damages or claims of any kind or description whatsoever, foreseen or.unforeseen, that may be made against the applicant or the City of Edmonds, or any of its department or employees, including but not limited to the defense or any legal proceedings including defence costs, court costs, and attorney fees by reason of granting this permit. In addition, applicant understands that the City shall -be provided a certificate of insurance to indemnify and hold the City of Edmonds harmless from all claims and/or property damage, naming the City of Edmonds as an also insured. APPLICATION OF CHAPTER 18.70 OF THE COMMUNITY DEVELOPMENT CODE: Applicant warrants that he has read, or had the opportunity to read, Chapter 18.70 of the Community Development Code, attached herewith, and understands that all terms of that Ordinance are incorporated herein as if set forth in full and this application and permit therefore are subject to the terms of that Chapter of the Edmonds City Code. eq;0 AA � i,--, � ci� �P-Tic�nt's Si ture tity of Edmonds, Communi y Services Department APPLICATION FOR STREET USE PERMIT - - Paqe 2 Approval (and Agreement, if applicable) of Abutting Property Owners: SIGNATURE PRINTEP—NAM- ADDRESS DATE DO NOT WRITE BELOW THIS LINE (To be completed by Issuing Agency) City Council Approval (if applAcable)(Attach.Minute Entry): .ADB Approval (if applicable)(Attach Minute Entry): _44 - Building Official Approval (if applicable): A/X� Signature Date Provision for Indemnity: re-owtots ce�h-hcg-&=l I L/ Terms and Provision of Performance Bond, if applicable: PERMIT AUTHORIZATION BY: eg,�� 'e, '0�� Sign&Yure Date PERMIT NO. RELEASED BY Remarks/Comments: FIRE DEPARTMENT APPROVAL POLICE DEPARTMENT Date Issued: 691171a RECEIPT NO. '4112- ENGINEERING DEPARTMENT APPROVAL 0 Permit Fee: 426-00 BUILDING PERMIT F lvltq DATE 6 - /,(-- e 2 DATE 6-16 47 DATE k WEST ATI- 7LET-I-C ,S--,,,, 0 0 Long Distance Running Sanctions Chairman: 70 Carole Langenbach A Track and Field 4261 S. 184th St. LA Cross Country Seattle, WA 98188 Race Walking March 1987 (206)433-8868 NAC LIABILITY INSURANCE COVERAGE FOR PNAC-SANCTIONED EVENTS The PNAC, as an Association of The Athletics Congress, is empowered to sanction (approve) local'running, race'walking, and track and field events which.meet standards of safety and organization. The Athletics Congress has a Comprehensive General Liability policy which -also protects events sanctioned by TAC (PNAC), directors and sponsors of sanctioned events, all member clubs, organized and supervised practices directly relating to a sanctioned.event,.all Association officers, and registered athletes participating in sanctioned.events. This coverage applies'only to Bodily Injury or Property Damage caused or alleged to have been caused by the above to the public. Insurance Company: Policy Period: Policy Number: CL50-1929 CL50-1930 Summary of Coverage Total limit: Unigard Indemnity Company, a subsidiary of John Hancock Property & Casualty Company April 15, 1986 - April 15, 1993 Limit: $250,000 per occurrence $750 1 000 per occurrence in excess of $250, 000. $750,000 aggregate $1,000,000 Extensions of Coverage 1. Contractual liability. 2. Personal injury 3. Premises medical payments (not athletes' medical expenses) 4. Host liquor law liability 5. Fire legal liability 6. Broad form property damage 7. Incidental malpractice. (not licensed physicians working at event) 8. Limited worldwide liability 9. Additional persons insured (employees and volunteers) 10. Extended bodily injury The policy does not cover: claims arising from operation or use ;Z of automobile, or damage to or loss of owned equipment. HOW TO GET A SANCTION:' The applicant must complete an.application for sanction and submit with fees to the PNAC. There are two fees; the local fee schedule is explained on the application; the national fee schedule is as follows: 1-100 entrants $ 15-00 1001-3,000 entrants $ 250.00 101-250 25.00 3001-6,000 600.00 251-500 50-00 600l-15',000 1 0500.00 501-1000 100.00 For the nati.onal fee, make the check payable to TAC. For the local fee, make the check out to PNAC. Send.both fees -to PNAC with the application (address above). r�fE ANI L7CS CON IR SS _1SA 0 0 is CITY OF EDMONDS CIVIC CENTER * EDMONDS, WASHINGTON 98020 * (206) 775-2525 March 25, 1987 Dr. Michael Medin Edmonds Road Runners 437 Fifth Avenue South Edmonds, WA 98020 Dear Runners: LARRY S. NAUGHTEN MAYOR The City is very happy to once again support the annual "Run for the Arts" on Saturday, June 20, 1987, from 9:00 A.M. to 10:00 A.M. I will notify Bobby Mills and Police Chief Dan Prinz so that this event can be coordinated. Sincerely, CITY OF EDMONDS . Naug en MAayor Z LSN/db cc: Bobby Mills, Public Works Superintendent Dan Prinz, Police Chief 0 40 CITY OF EDMONDS CIVIC CENTER a EDMONDS, WASHINGTON 98020 * (206) 775-2525 POLICE DEPARTMENT March 19, 1987 Dr. Michael Medin 437 5th Avenue South Edmonds, M 98020 Dear Mike: LARRY S. NAUGHTEN MAYOR I am aware of your interest in having another race in Edmonds the morning of.June 20, 1987. Please contact me when you are ready to discuss the plans. We are looking forward to working with you to ensure another successful event. Very truly yours, Dan Prinz Chief of Police DP/aeu 0 is 0 CITY OF EDMONDS. CIVIC CENTER - EDMONDS, WASHINGTON 98020 - (206) 775-2525 FIRE DEPARTMENT March 18, 1987 LARRY S. NAUGHTEN MAYOR Dr. Michael W. Medin 437-5th Avenue South Edmonds, WA 98020 Dear Mike, The 'Fire Department sees no problems with the upcoming 5 mile run in our city. Our only request is that you advise us in advance the route of the race. Also, the exact date and starting time. We will use the Fire Department Snorkel to start the race, again this year if you so desire. JDW: be Sincerely, c-kk- �D'C. ) Wlfei n F re Chief CASPrr7R6 �T STAR' 41,4 GLEN 7 A vE. AWARDS 5-Mile Race: Commissioned art for first through third place male and female overall winners. Awards through third place in age divisions: male/female 121under; 13-15; 16-19; 20-29; 30-34; 35-39; 40-44; 45-49; 50-59; 60-69; 70 and over. Fun Run: First through third place to male and female overall winners. First through 12th place ribbons awarded to 12 and under" age division. NISH '__7 _ah_f L a�rj A vE. W�ALJVU-r 9T. 5r,- AVE 2 A PERFECT TUNE-UP FOR ELM THE CASCADE RUN OFF! L _J L)Ay_ro�4 I arm A: AvE: IW-r-OAVE &3URSE We 5-mile TAC certified course will start on 6th Ave., adjacent to the Edmonds Civic Center. The moderately hilly course will run through scenic downtown and residential Edmonds with a fast finish downhill to the Edmonds Civic Center track. Clothing check is available day of race at the Start/Finish line. We are not responsible for lost or stolen articles. Traffic: This race is for runners only. Unregistered runners, unauthorized vehicles, bicycles, skateboards, rollerskates, strollers, carts and dogs strictly prohibited on the course by city ordinance and for runner safety. A: L! A�J: SPLITS AND AID STATIONS Splits will be called at each mile. One water station at approximately 3 miles. Aid station will be positioned at the start/fintsh line PNAC 5-Mile Mastas Championship: TAC membership is required to be eligible for Masters Championship awards and MUST be on your entry form. The first male and female TAC member in the 40-44; 45-49; 50-59; 60-69; 70 and over age divisions will receive a PNAC Championship patch according to PNAC Rulings. Random Prize Drawings: including an overnight trip for two to Victoria, B.C., on the Princess Marguerite (courtesy of Westgate Travel) will be presented during the awards ceremony. Anyone may register day of race for random prizes. You must be present to win. Results: Individual, computer -generated by MOVING LEGS. Complete results at Changes, Harbor Square, Edmonds, 778-4241, and at Moving Legs, 7811 Aurora Ave. N., Seattle, 783-8546. ENTRY FEES (BOTH RUNS) Must be Postmarked by June 14, 1987. $9.00 Ages 11 and over ($12.00 LATE REGISTRATION). $7.00 Ages 10 and under ($10.00 LATE REGISTRATION). $7.00 for Senior Citizens (Ages 65 and better). $1.00 off for TAC members with a 1987 coupon (must accompany entry form). The above registration fees include a high quality 50150 4-color t-shirt. $5.00 registration without t-shirt. Late Registration is from June 15, 1987 to day -of -race. $12.00 (ages 11 and over). $10.00 (ages 10 and under) A limited number of t-shirts will be available for day -of -race registrants. The rest will be mailed. Caution: As with most sports, road running involves a number of inherent risks, including, but not limited to, falls, contact with other participants or spectators, the effects of weather, including high heat and/or humidity, traffic and road conditions. In submitting your entry, you are acknowledging your awareness and assumption of all risks associated with road running events and are certifying that you are medically and physically fit enough to safely complete this event. 0 0 0 t E-- El El El .4 El :E El Ln Z_ 0) 2 E- C9 C) a 0.0 t ca Zo 00 4 V5 z 2-- �t is 5_3 7E 2 :a 9_2 CE Z; S. WE The Edmonds Run for the Arts annually features a different style of Art. This year Galen Burrell of Bainbridge Island, Washington, was commissioned for his wildlife photography. Mr. Burrell has been published in Eddie Bauer catalogs and Preeting cards as well as several books of his own photography C, The Edmonds Run for the Arts is a non-profit event made possible by the Edmonds Road Runners, generous support of major sponsors, cooperation of the City of Edmonds and the efforts of many volunteers. CHRNGC:S bruf-few'y in edmonds 6S-) SAAB Swattle on Hotel&Tbwers Edmo,ds P-0. .1 ITT Sdxoifds REALTY, INC- ACTION ATHLETICS, JOHN BECK, DOWNEY PRESS, McDONALDS at WESTGATE, PSSC LITHO, PATTI SULLIVAN & WESTGATE TRAVEL. LATE REGISTRATION AND PACKET PICK-UP Wednesday and Thursday, June 17 & 18 12:00 noon-6:00 p.m. Friday, June 19 12:00 noon-8:00 p.m. CHANGES Harbor Square 120 West Dayton Edmonds, WA 98020 ,diTig-4241 Applications can 1wed up at the Edmonds' Westgate Olson's and in local running stores. = 8 �? 63 r� :I n _- P, CD ­3 -3 ZZ e C) 0 K r;- 2� 0 3 0 Cr r-n > 0 > IN) CID y Z) 00 -t C) cn C) > CD EL 00 CD 0 C) 3RD Annual FAD] ONDS V� tat ple, t& 60��* SATURDM - 9 a.m. June 20, 1987 Edmonds, Washington * 5-Mile Road Run 9 1.6-Mile Fun Run PNAC Masters 5-Mile Championship sanctioned by Association ru t 0 of Road Racing z 0 Athletes P > PNAC SANCTIONED TAC CE10ED CbURSE ,PUBLIC WORKS DEPAM1ENT CHECKLIST � a .11441 IV 0 114 90 a (address) -7da-ue�— Street Right -of -Way Exist Z') Z Access Easements Existing :,D, QD c4 Utility Easement Existing REQD W Lot Per Subdivision Plat e"Ir Assessor �t ��4 P W Site Plan Checked for Accuracy, 10/1X Z Underground Wiring Reqd. V�, f U Check Accuracy of Legal Description t�y- Z Review by Date Existing Water Main Size. oil Water Main Required Service Line Required Hydrant Size Existing P� Hydrant Reqd Per Fire Code Size Detector Check Meter Reqd. Cross Connection I nspection Fire Department Conuents I e q Water Meter Mar Re d S t, Review. by. Date Septic Tank Design Approved Date, Septic Tank Permit Re'qd. Permit No. Sanitary Sewer Availabili Pro* ty, J. Drawing No. File No. Side Sewer Availability Sanitary Sewer Connection Fee Reqd. :3: Review by Date -47) Open Ditch Existl Reqd.__ Culvert Reqd. C4 Catch Basin Reqd. 77 /Z Indicate an Site Plaff- 0 Shoulder --��-ainage maintain collection an swale open runoff 4L19 �tmhole reqd. Indicate an Site Plan Soil Conditions and Ground Water Field Checked Date KeVIeW Dy ---22 C a " - --T - BUILDING DIVISIOW IERMIT APPLICATION 7-AIMIKE (OR NAME OF BUSINESS) fr A. INU ADDRESS z 0 CITY N AVE U W ADDRESS t /Icx) / LF M CITY NAME M — 0 AD z 0 U '1W PERMIT Applicant Fill ZONE NUMBER Inside Heavy Lines — —: OB .[A 0 D R E SS.�.: 7oo L L . L. EGAL DESCRIpTIONISUSDIVISION ONE NUMBER ELEPHONE NUMBER LEPHONE NUMBER FY LICENSE NUMBi Legal Description of Property (Show t3elow or Attach Four Co 7-1490tl�l /t 4 e)l 111��6,A-77- J��z Cl/ U th W a ', .j W j PUBLIC RIGHT OF WAY PER OFFICIAL STRICUT MAP":` EXISTING PROPOSED DEFICIENCY OF RIGHT OF WAY 0 PUBLIC IMPROVEMENTS REQUIRED DRAINAGE IMPROVEMENTS REQUIRED C1 DRAINAGE PLAN REQUIRED UNDERGROUND WIRING REQUIRED CONNECTION TO SANITARY SEWER SEPTIC TANK PERMIT REQ-0 NO. ELEVATION OF PROPERTY CORNERS & FOOTINGS REQ'D SEE ENGINEERING MEMO DATED CHECKED BY METER SIZE I BUILDING SUPPLY SIZE SIGN AREAPOSED JCOMENV. REVIEW ALLOWED I PRO PLETEI EXEMPT REMARKS VARIANCE OR CU IPI-ANNING REVIEW BY I DATE YARDS ILOT COVERAGE r4:71 GAS FILINE FRONT NEW EN RESIDENTIAL FIRE ZONE TV NON-RESIDENT.Al SIGN ADD RETAINING DEMOLISH SPECIAL INSPECTOR REQUIRED ALTER WALL EXCAVATE FENCE OR FILL I— X—FT) YES N 0 HECKED BY REPAIR PRE -MOVE swim INSP. POOL REMARKS NUMBER OF STORIES NUMBER OF DWELLING UNITS NAT-4RE Y ORK TO BE 00 —�.l . r4 r </ U A 7 -V -4AkW41t-jL1 ______BPLAN CHECK FEE -[PLO*� PLAN r_),CA �,\/ //4L-./ /�, BUILDING PLUMBING MECHANICAL FENCE "Applicant, on behalf of his or her spouse, heirs, assigns and SIGN W successors in interest, agrees to indemnify, defend and hold harmless i j the City of Edmonds, Washington, its officials, employees, and RETAINING WALL cc agents from any and all claims for damages of whatever nature, < SWIMMING POOL I arising directly or indirectly from the issuance of this permit. Issu- a ance of this permit shall not be deemed to modify, waive or reduce -1 01 any requirement of any city o. rdinance nor . limi I t I in any way the SIDE REAR] OF CONSTRUCTION 1 CODE HEIGHT ARE OCCUPANCY OCCUPANT I GROUP LOAD THIS SITE IS LOCATED IN THE CITY OF EDMONDS. LOCAL SALES TAX SHOULD BE CODED 31.04. VALUATION I FEE ,"Toy, USE M ZONE BUILDING DIVIS107N. Applicant Fill 10 1 Insid t e Heavy Lines PERMIT APPLICATION JOB 'JOR NAME OF BUSINESS) ADDRESS 70o LEGAL DE BDIVISION ILIN ADDRESS z V/6� PU13LIC RIGHT OF WAY PER OFFICIAL STRC6T 04A, CITY ELEPHONE NUMBER EXISTING PROPOSED NAME DEFICIENCY OF RIGHT OF WAY Q U W ADORIESS PUBLIC IMPROVEMENTS REQUIRED t 11C x �t? / 7 7-11 A.\IE- LF DRAINAGE IMPRO&JMENTS REQUIRED U E M CITY ELEPHONE NUMBER DRAINAGE PL UNDERGRO IT UND 1Z&%&LR E 0 CONNECTION TO SANITAIWAi-W NAME SEPTIC TANK PERMIT REQID S 0 ADDRESS ELEVATION OF PROPERTY CORN - R I- & FOOTINGS REWD U CITY TELEPHONE NUMBER SEE ENGINEERING MEMO DATED 0 U E NUMBER CITY LICENSE NUMFER CHECKED 13Y Legal Description of Property (Show Below or Attach Four Copies) METER SIZE BUILDING SUPPLY SIZE 04 //'/ + REMARKS z 2 SIGN AREA ENV. REVIEW ADB NO. 70 ALLOWED PROPOSED COMPLETE EXEMPT -y u 7W t—: SHORELINE 4 Ln W -v REMARKS W VARIANCE OR CU IPLANNING REVIEW BY DATE YARDS COVERAGE FRONT SIDE REA RI LOT GAS NEW RESIDENTIAL LINE FIRE ZONE TYPE OF CONSTRUCTION ICODE HEIGHT ADD NON-RESIDENTIAL SIGN I I RETAINING SPECIAL INSPECTOR J AREA JOCCUPANCY OCCUPAN' DEMOLISH WALL REQUIRED GROUP LOAD D ALTER EXCAVATE FENCE x FTr) C3 YES .. El NO I -i - OR FILL El I- LAN CHECKED By THIS SITE IS LOCATED IN THE CITY OF EDMONDS. LOCAL SALES TAX ElREPAIR PRE -MOVE swim SHOULD BE CODED 31.04. INSP. 0- POOL REMARKS z NUMBER OF SiORIES NUMLBER OF OWE LING UNITS HAT4.1RE ORK TO BE DON E , )F tr U w �03P-4Z'f Ll- If' 0 PLAN CHECK FEE VALUATION F E E PLOT PLAN 47P-4 X)k/V/4 F BUILDING PLUMBING MECHANICAL FENCE 0 and "Applicant, on behalf of his or her spouse, heirs, assigns SIGN 0 W in interest, agrees to indemnify, defend and hold harmless successors i i the City of Edmonds, Washington, its officials, employees, and RETAINING WALL it agents from any and all claims for damages of whatever nature, < I arising directly or indirectly from the issuance of this permit. Issu- SWIMMING POOL 0 ance of this permit shall not be deemed to modify, waive or reduce I -I nv renuirement of any city ordinance noT limit in any way the ple, (0 DATE: - MEMO TO: Building Division Communitv Development Department FROM: Engineering Division Public Works Department SUBJECT: �ro Ala.flq. After review of the subject Building Permit application, we have the following comments: X 1. Connection to City water system required. 2. 'Connection to Citv sanitary sewer system reauired. 3, Right-of-way Permit required for any work on City property . . 4,_—Driveway slope not to exceed 14%. 5. Backwater valve required if downsLairs plumbingis below elevation of upstream manhole. 6. Water and sewer lines to be_separated by 10 foot minimum. A- 0 Ve" / 1-0 iAJ c- L. j r:,, e- 4r&Y e-',L <:>-4 A 'P e-4 fr_ -rn P�-4,-I '5"b LO kc, C-A,-n e:) c5r-- J,,e_ j I e_� Q 4- 'i'l PS S I r-k PL,4-4-j Py- I b 7?-> lqvie-p T- Signature I 10 121� Odle I I 2LO .14 " 16*1 BUILDING PMffT REVIEW 7DO M16 IN je�: a (address) (date) Street Rig�ht-of-`Way Exist Z I Access Easements Exist lid Utility Easement Exist Lot Per Subdivision Plat 61ril, A,6,� omy,,a, Assessor Site Plan Checked for Accuracy, QK Z Underground Wiring Reqd. VZ1 H I 0 . Check Accuracy of Legal Description Ok Z Review by -7L L& Date -,)Y-JV Existing Water Main Size Jll� Water Main Required *14 Service Line Required Hydrant Size r4 Hydrant Reqd Per Fire Code Size Detector Check Meter Reqd. Cross Connection Inspection Fire Department Conuients :3: Water Meter Charge Reqd. a,-O S t, Review by_ Date Septic Tank Design Approved Date Septic Tank Permit Reqd. Permit No. Sanitary Sewer Availability Proj Drawing No. File No. Side Sewer Availability �i: Sanitary Sewe!r/Qomecp)ion Fee Reqd. Review by_ Date /.2 - Open Ditch Existing Reqd. Culvert Reqd. Cd Catch Basin Reqd. Incli cate on Site Plan' 0 Shoulder -i-7ainage maintain collection on swale open runoff W Manhole reqd. Indicate on Site Plan Soil Conditions and Ground Water Field Checked Date Review by — - e 10, %1011 51 Re - , Page 2 Street Paving Reqd. x , 0 Curb and Cutter Reqd. Sidewalk Reqd. d6- ( / ell Curb Cut for Driveway Reqd. e* ce Right -of -Way Construction d. Bond Reqd. for Public IiTpravements Street Name Sign Reqd. Other Signing Reqd. Pre Permit Site Inspection niade an z 0 BY: S94ER WATER $14 Z STREET ENGINEERING Special Requirements listed in mem to C=Lmity Development Department, Building Division BY Date c) All item filled in an Building Pernit Application V- BY Date Drawirkas Stamped and Notations Made A4 BY Date 4 Approved by Public Works Department Fzvised: 1v 10-1977 REPORT OF I- JUN 0 6 200-Mi 'T0MR7 7 B Y. Cl::Z' -------------- 491- -14 SOILS INVESTIGATION PROPOSEDIEDMONDS/SNO—ISLE REGIONAL LIBRARY EDMONDS, WASHINGTON RECEIVED JUN - 4 2007 BUILDING DEPT. nv CITY Cor I GeoEngineers, Inc. Consulting Geotechnical Engineers and Geologists I X GeoEngineers, Inc. Consulting Geotechnical Engineers and Geologists January 30, 1981 City of Edmonds Edmonds Civic Center Edmonds, Washington 98020 Attention: Mr. Fred Herzberg Director of Public Works _7 D R_ B 2 1 -9 8 1 Dir. Ot Public Works Proposed Edmonds/Sno-Isle Regional Library Edmonds, Washington File No. 138-01 Gentlemen: We are pleased to submit three copies of our Report of Soils Investigation for the subject project. The scope of our work was developed after reviewing preliminary drawings on the project provided by Arai/Jackson Architects and Desianers and a visit to the site to observe existing surface conditions. The scope of our services is described in our proposal letter dated November 7, 1980. Contractual terms were discussed on several occasions with Mr. Jim Jessel and confirmed in letters dated December 1, 12,and 18, 1980. Authorization for our work was provided verbally by Mr. Jessel on December 17. We appreciate this opportunity to be of service to you and are available to discuss this report and assist you in any further aspects of the project as ap- propriate. Yours very truly, G gineers, c K. T k: uttle si nt wd resident cc: Mr. Jim Jessel Director of Parks & Recreation Mr. Otello Zanchettin Arai/Jackson Architects & Designers 1.100 19th Ave. E., Seattle 98112 2020 - 124th Ave N.E. - Suite 201 - P.O. Box 6325 * Bellevue, Washington 98007 o (206) 881-7900 REPORT OF SOILS INVESTIGATION PROPOSED EDMONDS/SNO-ISLE REGIONAL LIBRARY EDMONDS, WASHINGTON INTRODUCTION The results of our sails investigation for the planned Regional Library in Edmonds, Washington are presented in this report. The site is located between Main and Dayton Streets and east of Durbin Street adjacent to the Anderson Cul- tural and Leisure Center. The east end of the site abuts this building. The project to be constructed on two levels consists of a centralized building and ad I jacent parking areas. The lower or "library" level of the build- ing will consist of the main library with its associated offices, lounges, rest - rooms, and display area. The upper or "plaza" level will consist of a large meeting room, mechanical room and kitchen in addition to.a public plaza. Covered parking would be provided at the east end of the library building. Additional library level parking would be located along the west end of the project site. Locacions of the library building and parking areas are shown on the Site Plan, Plate 1. We understand that maximum total design column loads for the new construction will range up to about 750 to 800 kips. Column spacing will be on the order of 34 feet. Wall loads are expected to be about six kips per lineal foot. Th . e planned elevation for the plaza is 147 feet. The library level floor elevation will be 130 feet. SCOPE The purpose of our work is to explore and evaluate soil and ground water odditions X§ a '5asis.- fbr`d6Veloping� rec6mmieind-ifff-dnM�" f'or those affected by subsurface conditions. Our scope of work includes the following geotechnical engineering services: I. Exploration and evaluation of fill and natural soils underlyingo the site. GeoEnglneers, Inc. City of Edmonds January 30, 1981 Page Two 2. Definition of pertinent engineering characteristics of the foundation support soils. 3. Design bearing value recommendations for continuous and spread footings. 4. Estimation of the magnitude and rate of settlement for foundations de- signed and installed as recommended. 5. Evaluation of the potential impact to the adjacent existing building from below grade and construction along the east side of the planned library structure. 6. Recommendations for cut slope or retention structures, as appropriate. 7. Recommendations for design lateral pressures and drainage facilities for the permanent retaining walls. 8. Evaluation of existing fills which may remain after site grading and re commenda t ions for upgrading or replacing these fills *as appropriate. 9. Recommendations for floor slab and pavement support. A field investigation program consisting of six borings drilled to depths ranging between 9� to 2911 feet below the ground surface was accomplished on December 24, 1980. The general locations of the explorations are shown on Plate 1. Details of the field explorations and laboratory testing of soil samples are presented in the Appendix. Elevations used in this report refer to City of Edmonds datum, Mean Lower Low Water (KLLW) equals Elevation 0-0. SITE CONDITIONS SURFACE CONDITIONS The area proposed for the structures is presently occupied by a playfield and tennis courts situated on two grade levels. It is likely that prior to the present development, the natural ground surface sloped downward toward the west at a relatively uniform slope as do -the adjacent Dayton and Main Streets. In grading to the present ground levels, some cutting and filling of the native soils probably occurred. GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Three SUBSURFACE SOIL CONDITIONS Native soils underlying the planned development consist of glacial alluvial deposits which accumulated during and before the last episode of glaciation which affected this region. These deposits have been preconsolidated by the weight of several thousand feet of glacial ice. Generally, the site is underlain by a rela- tively uniform deposit of medium dense to dense fine to medium sand. In Borings I and 2, a layer of dense sandy gravel of 4 and 10 feet in thickness, respectively, was encountered within the sand deposit. All of the borings except Boring 6 re- veal fill soils of varying consistency which range from 1 to 8 feet in depth below the asphalt surfacing. The presence of fill at these locations corroborates our expectations of a prior cut and fill operation to establish existing site grades. The native undisturbed subsurface soils exhibit relatively low compressibility and high permeability and will provide satisfactory support for properly construc- ted shallow foundations. The moisture content of the soils are generally damp to moist. Grou6d water was not encountered in any of the six borings. Although we would not expect ground water to present difficulties within the depths of excavation at any time, seasonal variations of the ground water level are possible. Further information on the field phase of this investigation, including graphic presentations of the boring logs, is presented in the Appendix to this re- port. SITE PREPARATION, GRADING AND FILLING We understand that the lowest finished floor will range between about Eleva- tion 130 and 135 feet. Therefore, the eastern one-half of the site should gener- ally be cut into native undisturbed soil.. In the western portion, there may be areas where fill is present below the subgrade elevation. If the depth of residual fill exceeds about one foot below grade, we recommend that it be excavated and re - compacted in lifts as structural fill., All asphalt, concrete, debris and organic soils should be removed from the site. The exposed subgrade, including existing fill less than one foot rhick, GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Four should then be rolled such that the upper 12 inches of soil are compacted to at least 95 percent of the maximum, dry density as determined by AASHTO Compaction Test Procedure T-180. Any new fill required within the building area, beneath paved surfaces and slabs -on -grade, and backfill for subgrade walls should be placed as structural fill. The suitability of various soils for use as compacted structural fill de- pends on the gradation and moisture content of the soil when it is placed. Soils containing greater than about five percent fines content (that portion of the soil passing a U.S. Standard No. 200 sieve) become increasingly sensitive to changes in the moisture content during compaction. Therefore, the compactibility of the soil becomes more difficult unless the moisture content is maintained at or near the optimum moisture content. In general, the on -site soils disclosed in our borings contain less than five percent fines based on a visual assessment. When these soils are placed and compacted as structural fill the moisture content should be maintained within two percent of optimum. Hoisture content determinations on representative samples indicate the soils may require some moistening prior to compacting. Structural fill should be placed in loose lifts not exceeding eight inches in total thickness and compacted at a moisture content within plus or minus two per- cent of optimum. Lumps of soil and rocks larger than six inches in diameter or deleterious debris such as organic soils, roots, wood, asphalt, and concrete chunks should be excluded from structural fill. Individual lifts should be compacted using appropriate compaction equipment, making sufficient passes to achieve the degrees of compaction recommended in sub- sequent paragraphs. The on -site granular soils may be most efficiently compacted by a large self-propelled, smooth drum vibratory roller. The use of smaller towed or hand equipment may require increasing the number of passes over an area, reduc- ing the loose lift thicknesses or a combination of both. GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Five Structural fill should extend at least five feet beyond the limits of the structure and/or all traffic ways, then down and out to the existing surface. For fills, a final slope of 2:1 (horizontal to vertical) should yield a stable backslope and allow proper compaction. We recommend that GeoEngineer.s, Inc. be present during structural fill* placement to observe the work and perform representative in -place density tests to verify compliance to the compaction specifications. We recommend that the sides of temporary excavations be sloped not steeper than 111:1 (horizontal to vertical). CONCLUSIONS AND RECOMMENDATIONS Pr)tTMT) AT TOM(Z The native in situ soils will provide satisfactory bearing support for the proposed structures. In our opinion, continuous wall footings should have a width of not less than two feet and a depth of embedment of at least 1.5 feet below the lowest adjacent finished grade. These footings should be set at least 12 inches into undisturbed native soil. For foundations designed and constructed as recom- mended, an allowable bearing pressure of 4000 pounds per square foot may be used. This value applies to the sum of all dead and long-term live loads, exclusive of the weight of the footing and any backfill above the footing. This b earing value may be increased by one-third for wind or seismic loads. We estimate the magni- tude of settlement will not exceed one -quarter of an inch and would occur rapidly as loads are applied. The allowable soil bearing pressure for spread footings at column locations varies with the width and embedment depth of the footing. The recommended com- binations of footing size and embedment are presented in the following table: Minimum Footing Minimum Footing Allowable Bearing Width (ft) Depth (ft) Capacity (Ks -A) 4 1.5 5.0 6 1.5 6.5 8 1.5 8.0 4 2.5 6.5 6 2.5 8.0 8 2.5 9.0* *Maximum recommended allowable bearing capacity regardless of footing size or confinement depth. GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Six The above values apply to the total design loads exclusive of the weight of the footing and any overlying backf ill. Ve estimate that settlements under maximum expected column loads will not exceed 3/4 of -an inch. Differential settlements may approach this magnitude between adjacent columns or between a column and a wall footing where there is a major difference in total loads. These settlements will occur rapidly as loads are applied. In some areas it may be necessary to overexcavate below planned footing subgrade levels in order to attain adequate embedment into undisturbed native soil. In these areas, the footings may be extended to the bearing surface or the excavation can be backfilled with a lean concrete mix to the design footing level. If adjacent footings are located at different elevations, the difference between their base elevations should be no greater than the clear distance be- tween them. Because of the relatively high. soil bearing values provided, we do not recommend supporting any footings on structural backfill. In preparing the footing subgrades, care should be taken to avoid loosening or disturbing the subgrade soils. Loosened soils should be removed from the excavation. The prepared footing subgrades should be observed by a representa- tive of our firm to determine the 'character of the soil and to verify that condi- tions are consistent with the soils anticipated from our borings. FLOOR SUPPORT The planned floors may be Supported as slabs -on -grade. The in situ native clean fine to medium sand should provide an adequate capillary break. However, we recommend a moisture barrier be provided between the soil and slab -on -grade. The exposed subgrade soils should be rolled so that the upper 12 inches are com- pacted to at least 95 percent of the maximum dry density (AASHTO T-180). Any soft or loose zones detected during the prerolling that cannot be compacted should be removed and replaced with clean granular soil. GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Seven PARKING AND PAVED AREAS The designated parking areas should be stripped of loose surficial and organic soils. The exposed soils should be rolled such that the Upper 12 inches are compacted to at least 92 percent of the maximum dry density (AASHTO T-180). Any structural fill required to achieve parking subgrade should also be compacted as specified. We recommend a pavement section consisting of a 4- to 6-inch thick crushed rock base coarse compacted to 95 percent of maximum dry density with a 2-inch thick asphaltic wearing surface covering the base coarse. In heavy traffic areas, we recommend increasing the asphaltic thickness by one inch. LATERAL EARTH PRESSURES ON SUBGRADE WALLS Lateral soil pressures on subgrade or foundation walls backfilled on one side only will depend on the degree of compaction and amount of lateral movement permitted at the top of the wall during backfilling operations. If walls are free to yield at the top, soil pressures will be less than if the movement is limited by the stiffness of the wall or by bracing afforded by interior walls or upper floor slabs which are constructed prior to backfilling. Using a recommended back - fill compaction of 95 percent of maximum dry density (AASHTO T-180) and using clean sand or sand and gravel, we recommend an equivalent fluid weight of 30 pcf (pounds per cubic foot) and 50 pcf be used for lateral earth pressures on yielding and nonyielding walls, respectively. These equivalent fluid weights are based on an assumption of a level backfill and allow for no buildup of hydrostatic pressure behind the wall. Any effective surcharges, such as floor loads, should also be included. For uniformly distri- buted loads applied on the fill surface behind the wall, a corresponding uniformly distributed lateral soil pressure equal to 30 percent of the surcharge should be added to the lateral soil pressures. In.order to prevent a buildup of lateral soil pressures in excess of the above design pressures, overcompaction of the backfill should be avoided. We recommend accomplishing this by placing backfill located within 18 inches of the wall in loose lifts not exceeding eight inches and compacting with a hand -operated or small self -propelled vibrating ptate. GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Eight In order to avoid a buildup of hydrostatic pressures behind the wall,. we recommend installing foundation drains consisting of smooth -walled slotted plas- tic or PVC pipe installed at least 111 feet below finished floor grade. The drain lines should be completely embedded in clean sand and gravel or pea gravel. Roof drains should not be connected to foundation drains. Backfill adjacent to the basement walls should consist of clean granular soil. The on -site fine to medium sands and sandy gravels may be used for this purpose. EXCAVATION FOR THE EAST PARKING STRUCTURE WALL We understand that the east parking structure wall will be located approxi- mately nine feet west of the existing school building. The planned depth for the wall footing base is nine feet below the existing school building floor slab grade. We have been advised that the west wall footing of the existing building is founded five feet below the floor slab. Based on this information, we con- clude that it will be possible to excavate for the parking structure wall footing without undermining the existing building footing. However, extreme care must be taken not to extend the excavation beyond a 1:1 (horizontal to vertical) plane extended from the base of the existing building wall footing downward toward the library site. Additionally, as previously mentioned, the overall excavation slope should not be cut steeper than V-2:1 (horizontal to vertical). An excavation of this configuration will result in removal of soil from the face of the stem wall between the ekisting footing and the school building wall. This will not be detrimental so long as the stem wall is a continuous structure. If there should be gaps in the stem wall, loss of support of the school building floor slab could be experienced. We recommend that a more precise determination of the configuration and elevation of this wall footing be made in the initial stages of site excavation. If this determination reveals conditions different than indicated above, we should be retained to review the requirements [or this excavation. GeoEnglneers, Inc. City of Edmonds January 30, 1981 Page Nine DRAINAGE CONSIDERA!rIONS Our borings did not reveal the presence of ground water. Although seasonal ground water fluctuations are possible, we do not anticipate ground water levels within the depths of the planned excavations. Additionally, the nature of the native subgrade soils is such that drainage of subsurface water by infiltration should be fairly rapid. Surface water runoff may be adequately handled by a well -designed storm water system with catch basins in the lower elevation areas. We recommend that the exterior ground surface adjacent to the structures be sloped away from the building to prevent pondiag of water. USE OF THI.S REPORT AND WARRANTY We have prepared this report for the City of Edmonds and their architects and engineers for use in design of a portion of this project. The data and report should be provided to prospective contractors for their bidding or estimating purposes; but o ur report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions. If there are changes in the loads, grades,, location, configuration, or type of construction for the planned development, the conclusions and recommendations presented may not be applicable. If design changes are made, we request that we be given the opportunity to review our conclusions and recommendations and to pro- vide a written modification or verification. When the design has been finalized, we recommend that the final design and specifications be reviewed by our firm to see that our recommendations have been interpreted and implemented as intended. The scope of our services does not include services related to construction safety precautions and our recommendations are not intended to direct the con- tractors' methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. There are possible variations in subsurface conditions between explorations and also with time. A contingency for unanticipated conditions should be included GeoEngineers, Inc. City of Edmonds January 30, 1981 Page Ten in the budget and schedule. Sufficient monitoring, testing, and consultation by our firm should be provided during construction to confirm that the conditions encountered are consistent with those indicated by the explorations, to evaluate whether or not earthwork and foundation installation activities comply with con- tract plans and specifications, and to provide recommendations for design changes, should the conditions revealed during the work differ from those anticipated. Within the limitations of scope, schedule and budget for our work, we war- rant that our work has been done in accordance with generally accepted engineer- ing practices followed in this area at the time the report was prepared. No other warranty, express or implied, is'made. The conclusions and recommendations in this report should be applied in their entirety. If there are any questions concerning this report, or if we can provide additional service, please call. ..Respectfully submitted, GeoEngineers, Inc. X William R. Cleveng Project Manage ac K. Tuttle President WRC/JKT:wd Three copies submitted GeoEngineers, Inc. EXPLANATION: �9 BORING LOCATION rNO NUMSEa REFERENC CRAWING ENITIT: =-O "ANDERSON - =�-MO-NDS, WA. CENTER LfBRARY, - SCHEMATIC By ARAIIJACKSON AR,--:IITFCIS AND DESIGNERS I'LAIt A —I BORING LOG AND SAMPLE DATA KEY DRIVEN SAMPLES BLOWS REQUIRED TO DRIVE SA�TLER ONE FOOT OR INDICATED MOISTURE PENETRATION USING POUND HAIIHER. FALLING INCHES CONTENT 'ooez"P" INDICATES SAMPLER 28 PUSHED WITH WEIGHT OF HAMMER 11. 2%x ill .01 DRY DENSITY 0 INDICATES LOCATION OF UNDISTURBED SAMPLE IN PCF INDICATES LOCATION OF DISTURBED SAMPLE INDICATES LOCATION OF SAMPLING GRAPHIC ATTEMPT WITH NO RECOVERY -LOG IETTER SYMBOL Sm SOIL TYPE OTHER TYPES OF SAMPLES DISTINCT CONTACT INDICATE'S LOCATION OF THIN WALL, PITCHER, OR OTHER TYPES OF SAMPLES BETWEEN SOIL STRATA (SEE TEXT) GRADUAL CHANGE BETWEEN SOIL STRATA BOTTOM OF BORING UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS LETTER DESCRIPTIONS SYMBOL GRAVEL AND CLEAN GRAVELS GW wEL.L-CRADEO,GRAVELS. GRAVEL-SANa COARSE MIXTLRES LIME OR -10 FINES GRAINED GRAVELLY SOILS ELITTU OR NO FIKS) GP POORLY-GRAOF0 f-AAYELS GRAVEL - SOILS SOO MIXIUPES. LliitE OR W FINES GRAVELS WITH FINES GM SILTY SRAVELS. rRAVEL-WjD_SI'_r 041 XtURES 14ORE T�m 30% OF COARSE FRAC- TtOm RFTAINm ON NO. 4 STEVe (APPRECIAffLE A)40LNqT OF FI*Si GC CLAYEY GRAVELS. GRAVCL-SAND-SILT MIXTURES SAND AND CLEAN SANDS SW WELL GRAOFG SAMS. QtAVELLY SANDS. SANDY SOILS . LITTLE CA NO FINESi L I TTLE OR M FINES HDRE TKAN W% CF MATERIAL IS SID POORLY-CRADE0 SmOS, GRAVELLY SNNOS. LITTLE OR NO P INES TIM No. 200 VE SIZE �m Tpm 50% OF COARSE FRAC- SANDS Sm SILTY TION PASSIhG WITH FINES SANDS. S*O-SILT MIXTURES SO . " SIEVE SC CLAYEY SANOS. SA140-CLAY mirn/RES IAPPRECIMKE AMOWr OF FINESI ML [N)RGkNIC SILTS AND vERY FINE SmoS, iILTY FINE SILTS ROCK FLOUR. OR CLAYEY FINE GRAINED AND LIQUID LIMIT S ,4NOS CA i.LAYF.Y SItTS wITH SLFW r , PLAST.Cf Y LESS SOILS CLAYS THAN 50 CL INORGANIC CLAYS OF Lnw TO PEONM PLASTICITY. GRAVELLY CLAYS. SANOY CLAYS. SILTY CLAYS. LCAN CLAYS OL OKWIC SILIS A)`O ORGANIC SILTY CLAYS OF LOW PLASTICITY SILTS MH I�ORGANIC 510S. MICAC&GUIS OR DIATO- MACEOUS 'WO KPE THAN �0% LIQUID LIMIT FINE OR SILTY SOILS OF MATERIAL IS TWN 11C. AND GREATER CH INORGANIC CLAYS OF HIC44 PIASTfCITY 200S STZE CLAYS THAN 50 FAr CCLAYS OH MGANIC CLAYS tT 'foRM it) t(jr.,, PLASTICITY. (IRC"IC SILTS HIGHLY ORGANIC SOILS PT PEAT. ',-,iAW rnILS VITm m1rH .mlc zo�nrqrs NDIF- CUAL 51\16OLS ItVICATE SORDERtl:4E SOIL �tASSIPI'.A71'Yl —7 GeoEngineers Inc. SOIL CLASSIFICATION SYSTEM DKEY TO SAMPLE DATA 1-4 C:) I .0 rn I-q BORING I ELEVATION 1401 GRAPHIC TEST DATA LOG DESCRIPTION ASPHALT sp 5* TAN FINE TO COA . RSE SAND WIn'TRACE O'�'GRAVEL (MEDIUM DENSE, DAMP)(FILL) I ;rl 39 E- 10] 3.9% - 104 9 GRAY FINE TO COARSE SAND WITH TRACE OF GRAVEL (DENSE, DAMP) w.. . . . . . 43 15 TAN SANDY GRAVEL (DENSE, DAMP) 27 20* 0 sp TAN FINE TO COARSE SAND WITH GRAVEL (MEDIUM DENSE, DAMP) 20 25 5.9% - 96 9 GRADES TO GRAY FINE TO MEDIUM SAND 99 30J 3.2Z BORING COMPLETED AT 29.5 FEET ON 12-24-80. NO GROUND WATER ENCOUNTERED *SEE KEY FOR EXPLANATION OF SYMBOLS GeoEngineers Inc. LOG OF EXPLORATION BORING 2 ELEVATION 1421 GRAPHIC 0 TEST DATA LOG DESCRIPTION I" ASPHALT sp 8 0 EL 5 .2.3% 97. GRAY FINE TO MEDIUM SAND WITH TRACE OF GRAV 4 (LOOSE, DRY)(FILL) III 31 10 4.1% FX4 4 6 GP 15-1 0 00 43 201 2.4% 0 GRAY FINE TO MEDIUM SAND WITH GRAVEL (MEDIUM DENSE, DRY) GRAY SANDY GRAVEL (DENSE, DAMP) GRADES TO DENSE 42 r 251 5.5% - 100 GRAY FINE.TO MEDIUM SAND (DENSE, MOIST) BORING COMPLETED AT 24.5 FEET ON 12-24-80 NO GROUND WATER ENCOUNTERED Geolingineers Inc. SEE KEY FOR EXPLANATION OF SYMBOLS LOG OF EXPLORATION BORING ELEVATION 1.2&1 GRAPHIC 0 TEST -DATA LOG DESCRIPTION ASPHALT sp TAN TO REDDISH —BROWN,- SLIGHTLY SILTY FINE TO MEDIUM- 5 12.7% SAND WITH TRACE OF GRAVEL (VERY LOOSE, MOIST)(FILL) 10 FZ - 4.1% — 96 IW z �-4 1. E-1 GRAY FINE TO MEDIUM SAND (MEDIUM DENSE, MOIST) BORING 4 ELEVATION. 127' GRAPHIC TEST DATA LOG 1" ASPHALT sp sm. 8 DESCRIPTION DARK BROWN, SLIGHTLY SILTY SAND 14ITH GRAVEL (LOOSE, MOIST)(FILL) sm 9.1% - 88 REDDISH -BROWN SILTY SAND WITH A TRACE OF ORGANIC MATTER (MEDIUM E, DRY) DENS SP 154 GRAY F INE TO MEDIUM SAND (MEDIUM DENSE, MOIST) j2.8% - 102 BORING COMPLETED AT 19.5 FEET ON 12-24-80 NO GROUND WATER ENCOUNTERED Geolingineers Inc. *SEE KEY FOR EXPLAVATION OF SYtABOLS LOCY OF EXPLORATION P L A TE-A- BORING 5 ELEVATION 1311 GRAPHIC TEST DATA LOG DESCRIPTION ASPHALT sp TAN FIRE TG MEDIUM SAND WITH IRACE OF GRAVEL sp (LOOSE, MOIST)(FILL) '97 6. GRAY FINE TO MEDIUM SAND (LOOSE, MOIST) E!4 26 GRADES TO MEDIUM DENS'rl. 44 (j BORING COMPLETED AT 9.5, FEET ON 12-24-80 E- NO GROUND WATER ENCOUNTERED *SEE KEY FOR EXPLANATION OF SY14BOLS Geolingineers Inc.*, LOG OF EXPLORATION BORING 6 EL�VATION 128' GRAPHIC TEST DATA LOG 8 3. 7;.' - 10 1 0 10 E- 04 W im 1 14 15J �-O% - 99 111 DESCRIPTION I" ASPHALT DARK BROWN SILTY SAND WITH ORGANIC MATTER (LOOSZ, DAMP)(FILL) TAN SLIGHTLY SILTY FINt TO, MEDIUM. SAND.- (LOOSE.., MOIST) -- GRAY FINE TO MEDIUM SAND (LOOSE, MOIST) GRADES TO MEDIUM DENSE BORING COMPLETED AT 14.51ON 12-24-80 NO GROUND WATER ENCOUNTERED *SEE KEY FOR EXPLAVATION OF SYMBOLS Geolingineers Inc. LOG OF EXPLORATION 2007�--OS'9�Z 70 rRANCES IWAP�SOIV CEA17-1�9 7�4Sff 51VCL6Sct9F— ��xP.41vSlolV /( f .0// 4 I iFkISTIAN; W,4"S Ro" w Rzelqo%le� WA I- I- C 1, Dq R,61-1,IM6 6A-7-i5 5,v/jT/&/(; Sl()IFoa< 7 Cl,gXl� 0,0157WA/6 6)(IS 7-(A/ 6. CUIR13 CUT r- PA Y-r-oa P-REFr App IVEW ctqtt WAJ�,s 7-o 1qm-rcH i5X1,5 T-1*6 WAL& Hg-lGff 7- 6F APPROK. ApOlnolv4f- W06D SCA64NIN6 fiFrlyt7D 7-0 To-P OF CMtL W,#(-C- -rb- 6RIA16 HF161-(F 7-0 mFw Yx Po S-r s 0PENIA16 rO r7e 041-0 MW u,'0110FA WOOD I . ScRi5-6W46 ENGINE RING DIVISION P 0 D S NOTE Date: 6)e'sr/w4N C#41W-1-114K -,iv JF EDMONDS WORK WPW-W!FiV APPROVE' - -1 CWT -0 V t- t- /A/ C7 c 614 R areatenciosurel :J a and lecatf-,*n 3pproveed by* op Date Y :) P, ROVED PLANNING 1 -(3 t c./v T D 41L6 R E C E 0 AufFEE B MAR 2 6 2013 DEVELOPMENT SE Rvit;ES CTR. CIrt OF EDMONDS 7 r -aid 1­�Sl ri ---------------- ---nj ------- fzj c,7-L'zi 15-k7, 0 CP-- �RY C3 Z q-Le ---------- r =1,1 �d -i' J� 'z4 pr-_7rV J, <1 *�i"15 wo-� ';Oi� 21- '6s ip, w J'�_'f_ L VIPs, z �c -Lsz oN ---------- ---- -- r�j rj f-a_Nwl 17-1 LT, L, O-PI JoA C-7,- Ob 47 _j / sc_1�3 kld f� IQ �71 7_1 ........ .......... 23'6" 49 (r South Elevation NTS Or Pz x1l 0 CZA 11 cz�j 4�v p-, Front Elevabon NTS North Elevation Back Elevaflon NTS NTS Ap. P OVED PLANNINU APPROVED BY BY: DATE: NO. DATE: BY: REVISION: CITY OF EDMONDS MECEOVED CITY OF EDMONDS PARKS & RECREATION FRANCE: ANDERSON CENTER DESIGN: JB 11/10/2015 Draft Permit Set COLOR ' )HEET: L 7 BANDSHELL 700 MAIN ST. EDMONDS, 98020 DRAWN: BS ELEVATION FEB 0 5 2015 7 OF 13 SHEETS 700 Main St., Edmonds, WA 98020 CITY ENGINEER i CHECK ED: i i B VIEWS DEVELOPMENT SERVICES I A S -W, N, tit, -T yvi -f l�, 31 f'r, —41 0 It. f; f Aj qi 1"': 1 .......... . tk f -Oi T T 41 .1. tit.. I 1% 11 !A. 4' Ttip 1-14 -54 1 7�7 ............ ... ... If Fill fillitil loll] ifilliffin 11111111111111111111111 Ill 1111till [it 1 111111111113 1"] Wit, I I if I fill 111111111 COD r Lh N 17 --4 o;OOo Izz pp.1 —T V-- o,96— CL E00 77T 17 t> u III tu ....... —/3Z- Prm H -Al ;44-r -i - ON T 4' T- m < t-M a I r I i '1, 1 1 J- I j i q -71- re\ I % - 1. . . . : �� 1 9 . i 7— 7 7—. 11.4— 4� I E 1 1 7-1 t, vl� !Lj 7777 (oil ---Pwr M,� 7-1 0 PIP! % Oil 3 2 Al I — Ent . . . ....... 14 01 k1 :—,j z mx4z Att 7 I I ;F 11 'I A* -11" r UL jllljl�"Iinunn um iini "llull il"ll"I = L 1A —L[—, )> =—V uv VT. aw 0 1- u —1 Ili p n �,! X - --------- IN P -7 6' "'X Al Q On 1-0 F A 7.r 47 7Xj -7- -�A IS -4 D T d\ -J\ 76 Ar , 41 RL sz K-1 TAI Al W bl�,-��' W114 Al. -4 I I ! 71 on ip > Y 19 v �, 1 '0 � q I I . -M it Jq 'P m tp 6, V i 0 0 4