Critical Areas Checklist
Site Information (soils/topography/hydrology/vegetation)
1. S ite Address/Location: Stolzenb*rg Short Plat
5009-000-055-0103
2. Property Tax Account Number:
3. Approx imate Site Size (acres or square feet)- 24,000
4. Is this site currently developed? X yes; — no.
If yes; how is site developed? Existing Residence
5. Describe the general site topography. -Check al I that apply.
Flat:' less than 5-feei elevation change over entire site.
Rolling: slopes on site generally less than 15% (a vertical rise of 10-feet over a
horizontal distance of 66-feet).
Hilly: slopes present on site of more than 15% and less than 30% a vertical rise
of 10-feet over a horizontal distance of 33 to 66-feet).
XX Steep: grades of greater than 30% present on site (a vertical rise of 10-feet over a
horizontal distance of less than 33-feet).
Other (please describe): North portion slopes -northerly into
Lund's Gulch
6. Site contains areas of year-round standing water: No Approx. Depth:
7. Site contains areas of seasonal standing water: No Approx. Depth:
What season(s) of the year?
8. Site is in the floodway NO flood plain No of a water course.
9. Site contains a creek or an area where water flows across the grounds surface? Flows are year-
round') N/A Flows are seasonal? N /A (What time of year?
10. Site is primarily: forested North Ptn meadow shrubs mixed
urban landscaped (lawn,shrubs etc)
11. Obvious wetland is present on site: M�
For City Staff Use Only
1. SiteisZoned?
2. SCS mapped soil type(s)? 9
mw"Ooy
:3. Wetland inventory or C.A. map indicates wetland present on site?
'Areas inventory..or C.A..map indicates Critical Area on site?
yt� .. ....
5 Site within designated earth subsidence landslide hazard area?
6. Site designated on the Environmentally Sensitive Areas Ma[P
DETERMINATION
STUDY REQUIRE CONDITIONAL7;R
WAIVER (�&&,
Reviewed by:_ i5 /�- -
PlYnn—er / bat�/
0
4
Rev 09/29193
ATTN: ANN BULLIS
V 90 - 19'
City of Edmon&
Critical Areas Checklist
The Critical Areas Checklist contained on
this form is to be filled out by any person
preparing a Development Permit
Application f*'the City of Edmonds prior
to his/her submittal of a development
permit to the City.
The purpose of the Checklist is to enable
City staff to determine whether any
potential Critical Areas are or may be
present on the subject property. The
information needed to complete the
Checklist should be easily available from
observations of the site or data available at
City Hall (Critical Areas inventories, maps,
or soil surveys).
An applicant, or his/her representative,
must fill out the checklist, sign and date it,
and submit it to the City. The City will
review the checklist, make a precursory site
visit, and make a determination of the
subsequent steps necessary to complete a
development permit application.
With a signed copy of this form, the
applicant should also submit a vi cinity map
.or plot plan for individual lots of the parcel
with enough detail that City staff can find
and identify the subject paicel(s). In
addition, the applicant shall include
other pertinent information (e.g. site
plan, topography map, etc.) or studies in
conjunction with this Checklist to assist
staff in completing their preliminary
assessment of the site.
I have completed the attached Critical Area ' hecklist and attest. that the answers provided are
factual, to the best of my knowledge (fill ou the appropriate column below).
Owner / Applicant: Applicant Representative:
Dr. Dennis'Stolzenbyrg
Name
Owner
Street Address
7003 156th SW
City, State, ZIP Phone
Edmonds, Wash. 98020 743-9771
Signature
Mbyrin . q . & . Assoc., Inc
Name
Agent
Street Address
23423 Hwy 99
City, State, -ZIP Phone
98026 778-3101
Date Signature __Pate
Edmonds, Wash
CITY OF EDMONDS
250 - 5TH AVE. N. - EDMONDS, WA 96020 - (206177.1-0220 - FAX (2061771-0221
COMMUNITY SERVICES DEPARTMENT
Public orks e Planninn e Parks and Reer—ti— i--;�
9 0 c� - N !1
LETFER OF TRANSA4MAL
Date: May 25, 1994
To: Dr. Dennis Stolzenburg
7003 156th S.W.
Edmonds, -WA 98020
Subjea: Critical Areas Ch.ecklist'
Transmitting:
LAURA M. HALL
MAYOR
For your information: Yxx
As you requested:
For your file:
Comment and return:
Note attachments:
Comments: Please bring in a copy of the Critical
Areas Checklist when applying for a building
permit.
Planning Division
Judy Kenney
Incorporated August 11, 1890
CITY OF EDMONDS
250 - STH AVE. N. - EDMONDS. WA 98020 - (206) 77.1-0220 - FAX (2061771-0221
COMMUNITY SERVICES DEPARTMENT
Public Works - Planninn * Parks and Recreation - En-ineerinn
9 0 C�
L=ER OF TRANSAffffAL
Date: May 25, 1994
To: Meyring & Assoc., Inc.
23423 Highway 99
Edmonds, WA 98026
Subjea: Critical Areas Checklist
Transmitting:
For your information:
As you requested:
For your file:
Comment and return:
Note attachments:
Comments:
LAURA M. HALL
MAYOR
Please bring in a copy of the Critical
Areas Checklist when applying for a building
permi t.
Planning Division
cc: Dr. Dennis Stolzenburg Judy Kenney
Incorporated August 11, 1890
City of Edmonds
Critical Areas Determination
Applicant: I Dr. Dennis Stolzenburg Determination #: I CA-94-98
Project Name: Permit Number:
Site Location: 1 7003 156th Street S.W. Property Tax Acct #: 1 5009-000-055-010
Project Description:
Stolzenburg Short Plat
Waiver Criteria (all criteria must be found to apply):
XXX There will be no alteration of the Critical Area or its required buffers;
XXX The development proposal will not impact the Critical Area in a manner
contrary to the goals, purposes, objectives and requirements of the
Critical Areas ordinance;
XXX The development proposal meets the minimum standards of the Critical
Areas ordinance;
XXX The above findings are based on the following conditions of approval:
1. Before any permit application may be applied for, submit to the Planning
Department a topographic survey prepared by a Licensed Land Surveyor
delineating Steep Slope Hazard Areas. Any slope over 30% with more than 10 feet
of rise will be classified as a Steep Slope Hazard Area. A 50 foot buffer is
required from both the top and toe of the slope. A 15 foot building setback is
required from the 50 foot buffer.
2. If the results of the above survey determine the lot unbuildable, any
development which is not identified as an exception per ECDC Chapter 20.15B
must receive a Reasonable Use Exception or a Variance pursuant to ECDC
20.15B.180A and 20.15B.040C).
3. All proposed development of the subject lot must meet the requirements
of Chapter 19.05 of the Edmonds Community Development Code.
Name Signature Date
ST041 Z
7_/,F _S7S_ AIIVD!� 1w7jSWDOWDAZ4l5 ADD.
7ZPA/
194,Xr
ZC-A-/77R,F FXRCi57L_
All &6�le J�tvllid-,151 lv7f
0/ 75�0 &S' , Z VA /, C T -5, 9 � 9, Z'
7�Z
I-e-55 /oc
C7/,
0— o A 7/0 elll'l 414
2 * 0
77777.7 7 777'e.1-Ir
5A
4.4�J
2arl 20 7,
9, /IZO
0'r J�A04/
K
1JINDS N6xie.00al,&
Ae Wr I.D
26 nad
194,7s- 111411 ZO 15
�s
0
156 S W.
IV
T iL
-and 4.01#yh4
TOWNSHIP .27 N., RANGE .4 1
NORTHWEST QUARTER
1990 SNOHOMISH COUNTY, WASHINGTON
z
v1j
OR A
4o fd.R,.
S$ 41 42
TA
z
DA
n
VER-
ISIST 5.w ILL W1 AIDS
lm'�k AIE
P 48 4-7
Li
> 41)
10 16 f
M14
S7. 455
511 45
�V4'�
It '9 Q'Q fils
to
PR p
-70
nAl OF
14 53 54 W_
A
7A I RIZ FI'NS'- I ,A
A
w M." PROP P, -r. aj .
> GA ACE MOSS ME WOWAALE
ts 18 17 5z 1 11 ON *3
- TINIL3EA
31 6 cz'
V A10. 2 "
57 (p 39 41 41 in
p 4o
Meadowdale
tu
"Ob S
54
4b
Ilk 4o 59
S-L - 44 45 47
4.74 4
.7 A uy WRE'v a
76 77 DtS
e6 '4Af 3S 4
Iq RJ �b. Am1n)
tu'j ,
1"A Z't ku Ik4TH
EADOWL 4LE
t9 AN. Q zt I w . VILLAGE
t9l
87 Nft 0
Iry VNIE5T 53 4.
C3 I? j MFAOOWPA
L
107 log IN F
;t 101060OWPALE 28
r 411 1 a
'I" XlLiAcig
1"o i t 1.7 H, V
TH ST. 5
'�100w_ C-) ki
;EI 12. 4j 1
'k,
E
�E It
'It
s I Ell,
A\\ 14U III W
<Ile Izz t' ' 4 - 0A 17
- A `( �_ 1�
\'A �V. I � WC,4
4.4 q ' 'W" I
I ST w.
AfE4Wwavi 4 m .'J - w 2
17Z
ESTAM TS1_ E575-Z I Ltd Q:
I 113L
PL 1�39 VAol - ED
-7--1 1-14- \I I 1 15 CO PL W.
IV/<uu/v_ 4 MY' ...... ..... ..... 7
V/ 2. 4r'._1114
to
1Z
145 147 148 TR.
5par I,] 'k
LAWV
MGMT PARK5/ c S
N D5 EADOWPAL ICHERRY
(INOWE VV M. ILL 178- 5 O-W.
b"A r?
b TED
MEAD
woo ;'i It N4L 54pu1RE LA 11i
161 103 YEN AICE A-5 IVA At V.
6L 165 k- 3
uiT�k F"
I80TK ST. 5.
Ff
IP 10 1
ltd 6
A
W
w
'tat, z !�:
-16
3
4
ov"Apic A
DS STS R
T..
I a
CITY CLERK (;ONFORMED Copy
CITY OF EDMONDS o,00007050i27
121 5TH AVENUE NO. jo:34 AM Snohomish
EDMONDS, WA 98020 35/2000 county
0711 02 jkECoRDED
P.00
CRITICAL AREA AND/OR CRITICAL AREA BUFFER NOTICE
Property Address: INS Ave, SJ.
Edmonds, Washington
A; 7.�i. j—:7 AV, W k f
yf
Assessor's Parcel Number: �560ql 000 055 ()/
Present Owner: _�eWt& Z'T0L-ZL-A(_Poie6-
NOTICE: This property contains one or more critical areas or their buffers as defined
by Edmonds Community Development Code Chapter 20.15B. The property was the
subject of a development proposal for -APL)171ct,�j
�t—(p (type of permit)
application # qq - 36 2A riled on 06 —. Restrictions on
(date)
use or alteration of the critical areas or their, buffers may exist due to natural conditions
of the property and resulting regulations. Review of the above application has provided
information on the location of the critical area(s) or critical area buffers and restrictions
on their use through setback areas. A copy of the plan showing such critical area(s),
buffers, and setback areas is 7attaVd h re it 1.
Property Owner Signature
yc�
C,
Q
Date:
:o tAOTAR�-
P1JBL
STATE OF WASHINGTON) It :A. -
C
29
COUNTY OF SNOHOMISH)
A
I certify that I know or have satisfactory evidence that
signed this instrument and acknowledge it to be his/he ee and voluntary act for the uses! and
purposes mentioned in this instru mient.
Notary's pressure seals must be smudged.
Signature of
Notary Publi
Residing at:
My Appoini
Expires: _
THIS DOCUMENT MUST BE RECORDED WITH THE SNOHOMISH COUNTY AUDITOR.
EXHIBIT
84
w
Oee
or-
82 LO
84-
twg
C14
W-er
...........
C14
ger E
U R
S4 IV DECK
RI
w
P,
NOTEi
TIE NEW ROOF AND
FOOTNG DRAINS
5EPARATELY TO
EXISTMI SY5TEIt
156th Avenue S,W,.
G)
See City of Edmonds Critical Areas
Plot,, Plan Variance File No. V-99-73
SCALE: 1 =401-011 -
PLANNImr., nATA
NAME: D1bv),,,
SITE ADDRESS: _z2_0_2 -
- LLLL, �JDATE:__AA_17/;��
ZONING: 2_� 7- ____�PLAN CHK#:- 9')
PROJECT DESCRIPTION: (A,- .%AWL
CORNERLOT No (Yes/No) FLAG LOT �r
(Yes/No)
SETBACKS:
Required Setbacks:
Front: to' * Left Side: 10, Right Side: 0 Rear: (o,-
.ActuaL�Le�c
Front:_,.4 �,Left Side: 59.5' Right Side: 17' Rear::j.�
Street map checked for additio—nal set —back required? ,
_LL_Y_�j —1-,-(Yes/No)
LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED- I
—(Y/N)
LOT COVERAGE: w)
Maximum Allowed:- 35,9.
—Actual: z8.1j, 9. V"
I -
BUILDING HEIGHT:
Maximum Allowed: 2�� Actual Height:
JOL V- 41A"
Datum Point:- 45-61 Datum Elevatlon: 1 &
A.D.U. CREATED?: No
SUBDIVISION:
CRITICAL AREAS #:_T4 - 98,
If 6r"-,-u 1, 414 6,,(/,�_ Sab,.�
SEPA DETERMINATION:- rDv& ocs,,A C:;-I),d /gq f,
LOT AREA:
_P.��OTH
Plan Review By:
C%fi1=4HnWft'*aaUdw
K <If� � 14-1-
-V -73
-------------
4,21 -- ',
It RjGnr�— ^"�Q ;F-
DATE RECEIVED
P RES
PERMIT EX I
L9
CITY OF. EDMONDS
USE PERMIT
ZONE
NUMBER
CONSTRUCTION PERMIT APPLICAT ION
JOB SUITE/APT#
W--Jzx�:'
ADDRESS �7 /V
,.DWNER NAME/NAME OF BUSINESS
PLAT NAME/SUBDIVISION NO.
LOT NO.
LID NO.
AID FEE $
J% 5AW�WA
W
t W
I
MAILING ADDRESS
PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP.
TESCP Approved 0
!�'r4
RW Permit Required Q
0
EXISTING PROPOSED
Street Use Penrill Req'd 0
Inspection Required 0
Sklmalk Required 0
CITY ZIP
TELEPHONE
619o2'b14'u-*1q:3
-"?I �>
REQUIRED DEDICATION— FT
Underground
Wiring required 0
NAME
METER SIZE.
LINE SIZE
NO. OF FIXTURES
PRV REQUIRED
YES 0 NO
z
ADDRESS
REMARKS
z
OWNER/CONTRACTOR RESPONSIBLE FOR EROSION -CONTROUDRAI NAG E
z
vg
LU
CITY ZIP
TELEPHONE..
7
1150"19"
WA
246
NAME
CON au I uoeas 1104 C
ENGIN§FFYNG REVIEWED/DATE
ADDRESS
cc
FIRE REVIEWED BY DATE
CITY ZIP
TELEPHONE
z
to
L`�JNWV44X)p
VARIANCE OR CU
SHORELINE OR ADB#
INSPECTION
REO'D
IPBOND
OSTED
sees
STATE LICENSE NUI.18_11 N DATE
\,q 1h (401
v. 0)9 . -73
(:)YES �GKO
SEPA REVIEW
COMPLETE ExeMPT
SIGN AREA
ALLOWED PROPOSED
HEIGHT
ALLOWED PROPOSED
on,
-ji
,
P ROPERTY TAX ACCOUNT PARCEL NO.
uS
5-005 OC90 051:� 0.
DiNi � I ,
E3(Pr,/Zf/"
..
25 2-4 - 5
0 NEW Z6 RESIDENTIAL UMBING�-
—0'-W �NCE
LOT COVERAGE
ALLOWED PROPOSED
..AEOUIRED SETBXCKS
FRONT SIDE REAR
PROPOSED SETBACKS (FT.)
FRONT UR SIDE REAR
P
C] COMMERCIA OMP NCE OR
ADDITION L Me
C GE OF USE
9
10
C'
z
PARKINP
REMODEL 0 APARTMENT 0 SIGN
REO'D P90VIDED
LOT AREA
PLANNING REVIEWED BY DATE
I
z
2- /Joao
GRADING FENCE
C:] REPAIR CYDS ( X FT)
REMARKS
_
E] DEMOLISH C] TANK E:] OTH ER
E&GARAGE 0 RETAINING WALL 0 RENEWA"L
CARPORT - ROCKERY
z
(TYPE OF USE, BUSINESSOR ACTIVITY) EXPLAIN:
CHECKEDBY
..
ITYPEOFCONItSTR
C OC PANT
a.
2
PEA H I L_ V, OF k>
0
uu
'0
kCTION
GROUP
-3
NUMBER
OF
NUMBER OF
DWELLING
CRITICAL
AREAS
SPECIAL INSPECTOR
REQUIRED
JAREA 115frLft 5k ia OCCUPANT
STORIES
UNITS
NUMBER
C3 YES
� vo IF�(Wvt 113 LOAD
n�4"
DESCRIBE WORK TO BE DONE
5e C-0 h-1 '<) S-%__0V_1N4
REMARKS
PROGRESS INSPECTIOJMS PER UBC 108/FINAL INSPECTION REG'D
A-)
Amyknoo mpt) UPPER,
(3222 t�
L F. 6 C Y, - 12
Ori -) c-4-tw) vn Q-r- uk ( R44
VALUATION
FEE
342.4
PLAN CHECK FEE
C)
HE SOU GLAZING I LOT 9L-
0/
AS r F; . I
BUILDING
t ( () QJ0.
_�3 .
PLAN CHECK NO: VESTED DATE
PLUMBING
:�)u
MECHANICAL
opty
THIS PERMIT AUTHORIZES ONLY, THE WORK NOTED. THIS PERMIT COVERS WORK TO
t BE DONE ON PRIVATE PROPERTY'ONLY. ANY CONSTRUCTION ON THE PUBLIC
a DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE
SEPARATE PERMISSION.
STATE SURCHARGE
W PERMIT APPLICATION: 180 DAYS
PERMIT LIMIT* I YEAR - PROVIDED WORK IS STARTED WITHIN 180 DAYS
SEE BACK OF PINK PERMIT FOR MORE INFORMATION , -
0 U 'APPLICANT, ON BEHALF OF HIS OR HER SPOUSE, HEIRS, ASSIGNS A_ND SUCCESORS
00
w IN INTEREST. AGREES TO INDEMNIFY� DEFEND AND HOLD HARMLESS THE CITY OF
j
2 EDMONDS, WASHINGTON, ITS OFFICIALS, EMPLOYEES, AND AGENTS FROM ANY AND
�Z(o
M
ALL CLAIMS FOR DAMAGES OF WHATEVER NATURE, ARIS!NG DIRECTLY OR INDIRECTLY
RECEIPT
FROM THE ISSUANCE OF THIS PERMIT, ..ISSUANCE. OF. THIS PERMIT SHALL NOT BE
PLAN CHECK DEPOSIT
DE
j EMED TO MODIFY, WAIVE OR REDUCE ANY REOUIREMENTOF ANY CITY ORDINANCE
/�z�o
0 NOR LIMIT IN ANYWAY THE CITY'S ABILITY TO ENFORCE ANY ORDINANCE PROVISION."
R, 81PT
TOTAL AMOUNT DUE
1 15,1 VJ
1 HEREBY ACKNOWLEDGE THAT I HAVE READ THIS APPLICATION; THAT THEMFORMATION
APPLICATION APPROVAL
GIVEN IS CORRECT AND THAT I AM THE OWNER. OR THE DULY AUTHORIZED AGENT OF
THE OWNER. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUC-
This application is not a permit until signed by the
CALL
TION; AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED
Building Official or his/her Deputy: and Fees are paid. and
IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
FOR INSPECTION receipt is acknowledged in space provided.
WORKMEN'S COMPENSATION INSURANCE AND RCW 18.27.
OF CIALS SIGNATURE DATE
OF
SIGNED
(4125)
IDATE
,4A t5boo
771-0220
ELE SE BY DATE
ATTb0MX1'
EXT 333
IT IS UNLAWFUL TO USE OR OCCUPY BUILDING OR STRUCTURE UNTIL
A
771-0221
A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFI-
ORIGINAL -FILE YELLOW- INSPECTOR
CATE OF OCCUPANCY HAS BEEN GRANTED. UbC SECTION 109
FAX PINK -OWNER GOLD - ASSESSOR
5/98
04
FILE
I OR
R E C E �j,
fw.�—
to
MAY 1
DEVELOPMENT SERVICES CTR.
CITY OF EDMONDS
VE
04
w
'ell it
Pr EXIST
EXIST111:1VS
Gw.
01 EL
r- , * -
02 119.'36'
korIE:
TW NEW ROOFA0
-A,:
t C a�3
Hoot Cak��
i Wff FL.
FL
1020'El-
v, EL.
?LE
T04
0,
k0a.
156th Avenue S.W.------"-
No,
Lot Coverage Cck VS ' L
Fxlor WOME 2>41 SOFT.
PR0P4:*E0 ADDIT04 265
DEC"
Toto" 4
LOT AfMA 28,421 SOFT,
PERCENTAGE cm
Leo DeW0011
FEET OF TWE �*CUTRM-f ?e* FE OF TRACT 55,
T�m —=, T, FAT TWEFREOF
Ltac,5 M .. ... RDW� To TM FL
*ECOF05P N VOL" 6 OF PAC.F 2C, FE1116 OF &40W0Mk%4
catscy, a4swl�r-TOK
=41=%TE=.��- IFE
OF SMD TkAdy S&.
m= D TO THE C— OF
E=r=� z= 'x
9,TUA,, , T,4E CCWM CF MoNaliSK STATE Of —W-tM
APPROVED BY PLANNING
(apm Plan
111=401
0
r
oulAwleo A/7WAc7rX fS
90.
47x1dl4444,j A,�
fflglb� �Lla
. ...........
W OF joaf
mv Or a�
+
NA10
Lk
\\ llkkjj�
m 0172- r wo.or
LWAL DESCRLpI70N
PARM A.
-Ift-0. 9S Asw of the mvmwff j tov .1 ?,M1 54
UftV~"o rl"M OC4vrd9lg to "th pW thseof
0-0.d I. Vok-, 6 .1 prol.,
CaImtA washovrow
Exapy I".. ww&yy 194.75 fee( r�-Vot
Exapr rts ewm 5 1"1 �-pwd 1. 01 Chr -1 rcOn-ft
PAPat
rA- h"aofy ID5 4*1 *1 1- -&'-ij, 20 %-' or floor sq.
01-0-OW- '-ft I,, th, zvcl ft-,
- '-w-e 6 .1 rv% p-gr M 'w"In of S)Ift.wsh
C�Alx KtLpA;wj,-
fXCIPI it- wsA" IP4,75 test 14.,t
ALSO ow door 15 Apst of me calm (00 Asof of *ord Tfx4 ft.
tvofp T 'he xv�m Sko foof 'a".)w r. irks (Ay of
r&-wub ftdor A.d1t. . s fr. pMM3,.
SM-11- 1h the Cb-fy or Sj.,. P,
DENN
7003 156th
Ljj[ EDMOND-IS. WASHINGTON
S1 98026
T Top
OPOGRAPHIC SURVEy
pol
Portion of Trant -rc;
Qj r- a -Qw 1
K. Xv - I - . "
X
�- -1 &3 r- 4LO
cr PAMO -
*kL
REFEUNCe SURVM
AM #77CW1022T. 10t(W I PACE 150
POS 0674n"M, 1`0UNr 26. FACE 47
POS 087MM5002. "WfiK 7A PACE 123
SURVETOR'S NOTES:
"4r 1314� cy w v0r--.wv0--
&MIU AAL tNoirdtlm, rfff WaNyiwDirs
9?001 AR -EAR ro nj DnPM SPJRVrrM
PROPER ry WR%VM ANY A rMM r ro Sri
PLA-wrif PRonwry c4mvms mkL RFWTtE
rtARWR PA'5170,Rof Aj4D Col" A"Tcl 11"r
PastrOv Cr ME opmoxv"M PROPFlory
I th" AS ShV)W.
=I W.'se
(AS r., Q0 X
V - i1D-
0 10 20
N lwlsrbo . W ALof&c a Or 1phm S, sw
wpo i PLAr or tLw,5 xLAorAwALr mokcTs
cn
cri
it
jj
MITCAL VATUV
&W.Aw
to
Or au,-.
b 10so
Avcj 4eADL r�
1 L or I
knwL- =
HIKIwam = Is
L
As V DOAT AF
12W AW PtN
Am ospowaxw
"RECEIVED
OCT 15 1999
DEVELOPMENT SERVICES CTR.
CITY OF EDMONDS
0 FOU" "'&AR & CAP /?-#I PER RO$0700CL.1001 AS NOYM
Oc"IM P0001
SM ExEVA nay
-1YARMSEN & ASSOCIATES, INC. DTIL IFT: on
FAN(CMEERS - SURVErOAS - PLA)vNRjqS CRE vf: rl. %t�
lum: 101killue
114 ft�v
17924 - 10210 97. SE (980) 799-7aU
r*37 UMCH an ale (Wg) 343-69M 5w k*-
CrAJ) "'M
"MCNA 9UM-MIG (sa0)7"-qoe? 0 1.,
ma KALD V - 2Y 2�,& IVIVW - AM W*
I-,- co
JA0 4A04t, Aat�4-�=
,,PROXIMATE PROPERTY LINE (SEE NOTE
QO .3#
S 00*52'
Qr
EDqE OF PX%;EM lK ------- N
0 E., 0-�S-
.3
CARPORT
4j
PATIO
N6
*no
4-
TOP OF.�A�
02-
101
NCj
100
:1/- --- 0. 3 E., 0. 2 ;FX
105.01, --99—
N 00-52#00" E 200.02' 0�
CP DGE OF PAVING
AINING WALL
)'CRIPTION
4k
0
CITY OF EDMONDS
121 - STH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220
RCW 197-11-970 Determination of Nonsignificance (DNS)
DETERMINATION OF NONSIGNIFICANCE
Description of proposal: A critical areas variance to allow the construction of a second story and main floor
addition to an existing single-family residence to be 7 feet from the top of a bank within a steep slope buffer and
buffer building setback (City of Edmonds File V-99-73).
Proponent: Dr. and Mrs. Dennis Stolzenburg
Location of proposal, including street address if any: 7003 — 156" Street SW, Edmonds, Washington
Lead agency: CITY OF EDMONDS
The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the
environment. An environmental impact statement is not required under RCW 43.21.030(2)(c). This decision was
made after review of a completed environmental, checklist and other information on file with the lead agency. This
information is available to the public on request.
X There is no comment period for this DNS.
This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from
the date below. Comments must be submitted by
Responsible Official: Jeffrey S. Wilson
Position/Title: Planning Supervisor, Department of Community Services - Planning Division
Phone: (425) 771-0220
Address: City of Edmonds, 121 - 5th Avenue North, Edmonds, WA 98020
Date:
XX You may appeal this determination to Robert Chave, Planning Manager, at 121 - 5th Avenue North,
Edmonds, WA 98020, no later than M 2- & 1999, by filing a written appeal citing the
reasons. V
You should be prepared to make specific factual objections. Contact Jeffrey S. Wilson to read or ask about the
procedures for SEPA appeals.
XX Posted on &�A 14 1999, at the Edmonds P ublic Library, Edmonds Community Services
Building, and the 15-Amonds Post Office.
XX Distribute to "Checked" Agencies on the reverse side of this form, along with a copy of the Checklist.
V99-73D.DOC Page 1 of 2
5/13199.SEPA
Mailed to the following along with the Environmental Checklist:
XX
Environmental Review Section
Department of Ecology
P.O. Box 47703
Olympia, WA 98504-7703
XX
—Department of Wildlife
16018 Mill Creek Boulevard
Mill Creek, WA 98012
XX
Snohomish County Planning Department
Attn: Greg Williams, Planning Director
I st Floor, Courthouse
Everett, WA 98201
XX
Snohomish County Parks and Recreation
Attn: Pat Kenyon
3000 Rockefeller Ave., M/S 303
Everett, WA 98201
XX
Agent: Ruth Gonzales
Gonzales Design Partners
P.O. Box 97
Arlington, WA 98223
XX
Applicant & Owner: Dr. and Mrs. Dennis Stolzenburg
7003-156 Ih Street SW
Edmonds, WA 98026
pc: File No. V-99-73
SEPA Notebook
Page 2 of 2
V99-73D.DOC
5/13t99.SEPA
J�i
C. W)",
I
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 - FAX (425) 771-0221
BARBARA FAHEY
MAYOR
COMMUNITY SERVICES DEPARTMENT
Public Works e Planning/ Building - Parks and Recreation - Engineering - Wastewater Treatment Plant
March 20, 1998
Gonzales Design Partners
P.O. Box 97
Arlington, WA 98223
Dear Ms. Gonzales:
On March 20, 1998, you submitted a critical areas checklist for your property at 7003 —
156th Street SW. In reviewing our records, we found that a critical areas determination
has already been made for that address under critical area . s file CA-94-98. That
determination was that a steep slope hazard area was on the site, and required that a
topographic survey prepared by a licensed land surveyor delineate the steep slope hazard
areas (see attached). Since the determination was made, the definition of steep slopes has
been changed. Under our current regulations, you are required to do the following.
To detern-iine if a Steep Slope Hazard Area does exist, a topographic survey prepared by a
Licensed Land Surveyor delineating Steep Slope Hazard Areas must be completed. Any
slope of 40% or more with at least 20 feet of rise will be classified as a Steep Slope
Hazard Area. A 50-foot buffer is required from both the top and toe of the slope. A 15-
foot building setback is required from the 50-foot buff�r.
For development of any kind which is proposed within the critical area, 50-foot buffer or
15-foot buffer setback, it must be shown that the development will not adversely impact
the Critical Area or its buffer, by doing one or possibly both of the following depending
on the outcome of the study:
For development proposals which will occur within the 50-foot buffer, but no
closer than 25 feet from the top or toe of the slope, the 50-foot buffer requirement
may be reduced to 10 feet if a study is completed by a licensed geologist or
geotechnical engineer which clearly demonstrates that the proposed buffer
alteration will have no adverse impact upon the site, the public or any private
party. All Critical Area Studies, except those done by a licensed geotechnical
engineer, must be completed under a three party contract where the City hires the
professional required, and the applicant pays for the study (pursuant to ECDC
Section 20.15B. 150).
9 Incorporated August 11, 1890 *
Sister Cities International — Hekinan, Japan
Gonzales Design Partners
March 20, 1998
Page 2
2. If development must occur within the critical area, buffer, and/or buffer setback,
and is not identified as an exception per ECDC Chapter 20.15B, a Reasonable Use
Exception and Variance must be obtained pursuant to ECDC 20.15B. 170A and
20.15B.040C.
All proposed development of the subject lot must meet the requirements of Chapter 19.05
(Building Permits - Earth Subsidence and Landslide) of the Edmonds Community
Development Code.
If a property owner wishes to apply for a specific development permit which they feel
would not impact the Critical Areas located on the site, they may submit their proposal to
the Planning Department for review. If the Planning Department finds that the proposed
development permit will not adversely impact a Critical Areas or its buffers, a conditional
waiver may be issued on a project by project basis.
With your checklist, you also submitted a sketch showing the approximate top of slope.
The map has not been stamped by a surveyor, and it does not make it completely clear if
there is a steep slope on site, where it is located, or where the buffer and building setback
for the steep slope are.. Before you can apply for a building permit or other permit
application, we will a need a topographic survey prepared by a Licensed Land Surveyor
delineating the 9teep Slope Hazard Area, buffer and building setback.
If you have any questions, please call me at (425) 771-0220.
Sincerely,
Meg Gruwell
Planner
cc: File #CA-94-98
Enc.: CA-94-98 Determination
'Ad
C-n 9 L+-6 0) c,31 -
te:5� I
qyN&K - d 01
o"M rj CA",
d2c-�j
-o4r, dal
ZGe.
-oie-,
(J-a
40
(f e-I
1116 1 14-ifW2
8 9 0 - 19"
Citv of-F-4monds—....
RIGHT -OF -WAY —CONSTRUCTION
PERMIT
Permit Number. JL C>0
C,
Wue Date: "9
A. Address or Vicinity of Construction: - 7003'156 St Sw i6 (952057)
B. Type of Work (be specific): Tinatall sarvirp
C. Contractor: - Washinton Natural Gas
Mailing Address: 1122 75 St SW Rverett
State License #: 98203
D. Building Permit # (if applicable):
Contact:. Frank Swan
Phone: 447-3284
Liability Insuradce: Bond:$
Side Sewer Permit # (if applicable):
4.,
E. Commercial E] Subdivision El City Project W Utility (PUD, GTE, WNG, CABLE, WATER)
Multi -Family EJ Single Family F1 Other
INSPECTOR: INSPECTOR:
F. Pavement- or Concrete Cut UYes 0No G. Size of Cut: H. Chargq_$
cut- --- -_ - I
APPLICANT TO READANkPN
INDEMNITY. Applicant understands and by his signature to this application, agre . 6i to );�dt4e City ofEdmonds haAhless�t4m' y0li7l4is, ch��, or
claims of any kind or description whatsoever, foreseen or unforeseen, that may be made ag�afinst the City of Edmonds, or any of its departments or
employees, including or not limited to the defense ofany legalproceedings including defense costs, and attorney fees by reason ofgranting thispermit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE OF THE WORK ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH
IS COMPLETED BY CITY FORCES, AT WHICH TIMEA DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THEAPPLICANT.
Construction drawing of proposed work required with permit application.
A 24 hour notice is required for inspection; Please call the Engineering Division, 771-0220.
Work and material is to be inspected during progress and at completion.
Restoration is to be in accordance with City Codes.
Street shall be kept clean at all times.
Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer.
All street cut ditches shall be patched with asphalt or City approved material prior to the end of the working day;
NO EXCEPTIONS.
Ihave read the above statements andunderstand thepermit requirements and thepink copyof thepermit will be
available on site at all r inspe t * es.
. � zti �__ . y ign purpos
Signature: dwa Date: 9-25-95
(Nntractor or Agent)
CALL DIAL -A -A, PRIOR TO BEGINNING WORK
FOR CITY USE ONLY
APPROVED BY: RIGHT OF WAY DEPOSIT
TIME AUTHORIZED: VOID AFTER "DAYS: -,DISRUPTION FEE/FUND III:
SPECIAL CONDITIONS: RESTORATION FEE:
PERMIT FEE:
TOTALFEE: oc�!)
COMMENTS: RECEIPT FEE:
7)
DATE�- ISSUED BY:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
\ I \' Eng. Div. 1994
FIELD INSPECTION NOTES (Fund I I I - Route copy to Street Dept.)
Comments:
I Diagram
CONTRACTOR CALLED FOR INSPECTION 0 YES 0 NO
Partial Work Inspection by P.W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
%#*#a d =1 - of Vm bw 0 one 1 i
Natur5lGasl�
Awmhngton Erergy Cbnvaryv
Watermain depth 16
'2,,� " gas main
Addendum to: City of Edmonds
Right of Way
Permit Application
Submitted by: Mariamne Kingsbury
Engineering Aide
Washington Natural Gas
1356-7500 X7596
700-6 (S('j 4::�>T-
4L�)
J q E5 ?X, 2>57
Key: !
-w- Water
-c- Gas
.7SS- Sever
-& Water hydrant
0 Water valve
Washington Natural Gas Company
1122.75th Street S.W., Everett, Washington 98203, (206) 355-3331
NaturMGw
AVAWwx*)nEr*rgyCaTV&V
Watermain depth 1�5 it
'07 " gas main
Addendum to: City of Edmonds
Right of Way
Permit Application
Submitted by: Mariamne Kingsbury
Engineering Aide
Washington Natural Gas
1356-7500 X7596
Key:
-G-
-SS-
0
;Ioo-b (S(O 4::--)T- ')
4VIII-I
C�6> 95 &,557
t CAkT
Water
Gas
Sewer
Water hydrant
Water valve
Washington Natural Gas Company
1122.75th Street S.W., Everett, Washington 98203, (206) 355-3331
I&AL- —IL-2
IFIACM M pub Pon
MEWWW98
Naturildw
AWWvvk)nEregyGwmv
Watermain depth I
'�" gas main
Addendum to: City of Edmonds
Right of Way
Permit Application
Submitted by: Mariamme Kingsbury
Engineering Aide
Washington Natural Gas
1356-7500 X7596
Key
-G-
-SS-
0
700,--b (S('O
.of
C6> 95 ?X,557
Water
Gas
Sewer
Water hydrant
Water valve
Washington Natural Gas Company
1122,75th Street S.W., Everett, Washington 98203, (206) 355-3331
CITY OF EDMONDS
C�
FOR INSPECTION CALL -
PUBLIC WORKS DEPARTMENT Permit
SIDE SEWER PERMIT, 7,2 A� Z2^7
315-25-2-5 Ext. 2-= Issue Date
2 0 a
PEP -MIT MUST BE POSTED ON JOB SITE71�__j
ErAwAft� D: :L1 N:E]
1 Address 0 f 0 struction-7co-I
jr,
2. Property Legal Description (include all easements-l---
PENN PE
'2 - 7.2, �51 htt: I 101Lt
3. Single Family Residence Multi -Family No. of Units
Commercial
4. Owner and/or Builder J?j 1TPL U-,2 10D 7
5. Contractor & License No. T-40_ —,8Pu6g- DA Y IS IVS.3 -3,a
6. Invasion into City Right -of -Way No &,**- Yes (If Yes Right-of-
way Construction Permit Required - Call Dial Dig (.8A0-1%4A10 before
1-800-454-5555
excavation)
7. Cross other private property: Yes No Pl"_ Easement required
attach legal description and county easement number.
READ THE FOLLOWING AND SIGN:
a4
a. Property owners must obtain a permit to install side sewers on
>I their property. A licensed side sewer contractor must be employed to
construct side sewers in the public' right-of-way.
b. The side sewer contractor assumes full reponsibility for each
installation for one year.
4 C. Commercial establishment requires a minimum of a six inch (6")
P4
z side sewer line.
0 d. Side sewers may not be installed closer than thirty inches (30")
to any structure.
0
e. Side sewer lines must be laid at a minimum grade. of 2% (1.15
and maximum grade of 100% (450).
0 0
E-4 f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed
between cleanout. All 90 turns must be constructed of a 45 (1/8
bend) and wye with removable cap.
g. No down spouts, footing drains or floor drains can be connected
to side sewer system.
h. Pea gravel is required for bedding when installing sewer lines
through other than granular soil.
i. Cleanouts are required at 30"-60" from each plumbing exit line
and at minimum intervals of 100' along sewer line run.
j.. Trenches within City right-of-way must be restored to original
conditions. Contractors shall be responsible for right-of-way failure
due to poor compaction of fill.
k.- Side sewer must be left uncovered until inspected and approved
by the City.
Jr. Inspection during normal working hours only. Two (2) working
days notice required.
DATE:
I-dertify 9At'I have read
and shall comply with the above
PERMIT FEE:,30, 00
'A� 00
CONNECTION FEE:
0
44
PtRMIT MUST BE
DISAPPROVED BY: Date: —
Date:
APPROVED By: Date:2
POSTED ON JOB SITE OW5/27)
Side Sewer Drawing
The City of Edmonds EASEMENT NO - ---------------------- --------------------- -
frkeft. c4roA.
NEW CONSTRUCTION REPAIRS LID NO. -9,-0 ------- - ASMT. NO - ------------------
OWNER -------------------------
----------- CONTRACTOR ------- --------------------- PERMIT NO. G-5.4-5-
JOB ADDRESS ...... )-SG-T'4 --- ST--S-W� ------------------- LEGAL DESCRIPTION: LOT NO. -------------- BLOCK NO - ------------------------------------
------------------------------------------------------------------------------------------------------------------------------- [L
NAME OF ADDITION ----------- --------- ------------------------------------------------------------ _YMWOOD UNE
>00-% NOP-T H- ;;I
94'.
70 TH
PWW-0001-1 1/75 (REVA 1/78)
2-4
1,I)p
4"C-OZAP
275
4�DP
W%Ac
Approved:
DATE.O.Clao-L---
7j30.3 JSG Tll ST.
1-51W.
C.0.ww
f__
L L'I
cri I
L11
17,
SLA V1,V
j z-
N
APPROXIMATE PROPERTY LINE (SEE NOTE)
S 00*52'00" W 29.5 M'
0,
00.02'
F
TOE OF SLOPE
OF P/MvEllf-
4__
TOP OF BANK
CARPORT
7 7 7 7 7
NO
AD
V%
7
L
HOUSE
4�
01
CONC. PA770
TOP OF BANK
—102-
-101
95.01, A'. 105.01, _99— 0,3 E., 0.2 S.
_A\
41;d l� 1
N 00*52*00" E 200.02' !.
41 011
oN � I -,---EDGE OF PAVING
LEGAL DESCRIPTION
PARCEL A:
The northerly 95 feet of the southerly 300 feet of Tract 55,
Lund's Meadowdole Tracts, according to the plot thereof
recorded in Volume 6- of Plats, page 26, records of Snohomish
County, Washington;
EXCEPT the westerly 194.75 feet thereof,
EXCEPT the'south 5 feet -conveyed to the City of Edmonds,
under Auditor's File #2027832.
PARCEL 8:
The northerly 105, feet of the southerly 205 feet of Tract, 55,
Lund's Meadowdole Tracts, according to the plot thereof
recorded in Volume 6 of Plots, page 26, records of Snohomish
County, Washington;
EXCEPT the 'westerly 194,75 feet thereof,
ALSO the east- 15 feet of the south 100, feet of said Tract 55;
EXCEPT the south 5.0 feet thereof, conveyed to the City of
Edmonds under Auditor's File #2027832.
Situate in the. County of Snohomish, State of Washington.
.iDp i'-n oQS, (5440kt 0 St�'T.
WALL
REFERENCE #'_-VRVEYS:
ROS #7708010226, VOLUME 5. PAGE 256
ROS #8702105001, VOILUME 24, PAGE 67
ROS #87080650OZ �OLUME 25, PAGE 125
SURVEYOR'S ',�'�70TES:
THE ORIGINS OF THE MONUMENTS ALONG 156th
STREET ARE UNKNOV1.7-4. THE MONU�,44ENTS
SHOWN APPEAR TO [IT EXISTING SURVEYED
PROPERTY CORNERS -'ANY ATTEMPT TO SET
PERMANENT PROPER Y CORNERS MLL REQUIRE
FURTHER RESEARCHAND COULD AFFECT THE
POSITION OF THE APcIROXIMATE PROPERTY
LINES AS SHOWN.
HT�r
0
95.01'
N 00*52'Oe
E
I-Z4
0
Z
10)
0;
Ito
10. 1 E 0. 1 S.
FD I" BOAT SPIKE AT
720d A VE PER
ROS #8708065002
LEGE ND
0 FOUND REBAR & CAP #13041 PER ROS#8702105001 AS NOTED.
A CONTROL POIN T
+**.* SPOT ELEVATION
HARMSEN & ASSOCIATES, INC.
ENGINEER S S UR VE YOR S ,> PLA NNER S
162ND ST. SE (360) 794-7811
17614
34137
POST OFFICE BOX 516 (206) 343-6903
11ONROE, WA 98272-0516, (360) 794-9087 (FAX)
DWN.
BY: drs
CHK.
BY: rfe
DATE: 10/29/98
JOB
#: 98-186-07
F/B
#: 509
SCALE: 1" = 20'
01
I
TOE OF SLOPE
APPROXIMATE PROPERTY LJNE (SEE NOTE)
QP
S 00'52'00" W 295.0,3' /001
ro 200.0�
EDGE OF PIVEMENT
+ 1�
TOP OF BANK 0.3 E., 0.� S.
CARPORT
HOUSE
12
0
t Z Z /f
TOP OF BANK
\1v
(b
10 1
A 105.01'
N 00*52'00" E 200.02'
LEGAL DESCRIPTION
PARCEL A:
The northerly 95 feet of the southerly 300 feet of Tract 55,
Lund's Meadowdole Tracts, according to the plot thereof
recorded in Volume 6 of Plots, page 26, records of Snohomish
County, Washington;
EXCEPT the westerly 194.75 feet thereof,
EXCEPT the south 5 feet conveyed to the City of Edmonds,
under Auditor's File #2027832.
PARCEL B.'
The northerly 105 feet of the southerly 205 feet of Tract 55,
Lund's Meadowdole Tracts, according to the plot thereof
recorded in Volume 6 of Plots, page 26, records of Snohomish
County, Washington;
EXCEPT the westerly 194.75 feet thereof,
ALSO the east 15 feet of the south .100 feet of said Tract 55;
EXCEPT,the south 5.0 feet thereof, conveyed to the City of
Edmonds under Auditor's File #2027832.
Situate in the County of Snohomish, State of Washington.
DENNIS S TOLZENBURG
7003 156th SW
EDMONDS, WASHINGTON 98026
TOPOGRAPHIC SURVEY
Portion -of Tract 55
AINING WALL
CONC. PATIO
WIM
,q �
4�p'
OF PAVING
REFERENCE SURVEYS:
ROS #7708010226, VOLUME 5, PAGE 256
ROS #8702105001. VOLUME 24, PAGE 67
ROS #87080650OZ VOLUME 25, PAGE 125
SURVEYOR'S NOTES:
THE ORIGINS OF THE MONUMENTS ALONG 156th
STREET ARE UNKNOWN. THE MONUMENTS
SHOWN APPEAR TO FIT EXISTING SURVEYED
PROPERTY CORNERS. 'ANY ATTEMPT TO SET
PERMANENT PROPERTY CORNERS MLL REQUIRE
FURTHER RESEARCH AND COULD AFFECT THE
POSITION OF THE APPROXIMATE PROPERTY
LINES AS SHOWN. '
V -
AV
lsl�
i
i
N
,,HARMSEN & ASSOCIATES, INC.
.1 ENGINFSERS --, SURVEYORS - PLANNERS I
7614 - 1.62ND ST. SE (360) 7944-7811
5
206) 343
OST OFFICE BOX 516 (206) 343-5903
-0516 (360) 794-9087 (FAX)
MONROE, NA 98272
Z;,K,
GONZALES DESIGN PARTNERS
P.O. BOX 97, 6823 211 TH PLACE NE
ARLINGTON, WASHINGTON 98223
January 5,1999
To: Mr. Jason Tourtellot, Planner
City of Edmonds
121 - 5 th Avenue North
Edmonds, Washington 98020
RE: Dr. & Mrs. Stolzenburg Residential Addition
7003 - 156 th Street SW
Edmonds, Washington
Dear Mr. Tourtellot,
Peczlyzo
JAN 1 1 1999
PLAN&g.,a DEPT
to V/'
The existing residence has been identified as being in a Critical Slope Area per the City of
Edmonds and must meet the requirements outlined in City of Edmonds Code, Section 19.05.
The following information is in regards to the existing residence and the addition noted above.
The project is an addition to an existing residence located on flat ground, the addition -will also
be located on flat ground. The issue is the proximity of the addition to the top of the existing
slope. Per the City of Edmonds Critical Areas Site review conducted for this site a
Geotechnical Report and Topographic Survey, each prepared by a Licensed Washington
State Engineer, where required. These items have been provided and based on this
information the Geotechnical Engineer has recommended Construction of the addition would
have no adverse impacts on the existing slope provided the footing bearing point is taken to
depth of at least 6'-0" and into the dense to very dense drift line of soil. Also in the report
recommendations for slope protection and grading have been included. The addition shall be
constructed per these recommendations.
The Soils Engineer has identified the on site natural slope average as 33% and it descends a
vertical distance of +t- 33'-0", this determination was- reached through on site investigation.
See attached soils report dated October 1, 1998. The City of Edmonds Code by definition
requires both the slope to be greater than 40% and the vertical, distance to be over 20'-0" to
qualify as a Steep Slope Hazard Area. Also, per City of Edmonds Staff interpretation the
slope shall be based on the original grades of the property, therefore the onsite conditions
would not qualify the site as a Steep Slope Hazard Area. It is not until farther North, off the
Stolzenburg's property, that both these conditions occur. The natural slope, per the
Geotechnical Report prepared by Nelson-Couvrette Engineering, does not exceed 33% until
approximately 240'-0" from the proposed Northerly Addition. This area is beyond the.
Stolzenburg's northerly property line and is not in their control, it is a county park.
The proposed construction, as located, has no potential for adverse impact on adjacent
property owners, public improvements, or the public in general and meets the requirements
stated in City of Edmonds Community Development Code Section 19.05.000 Preamble -
Statement of Purpose. The proposed addition does not restrict neighboring views or other
existing structures. The property to the North and East of the existing residence is
greenbelt/park land and heavily vegetated. There area noresidences located adjacent to the
January 12, 1999
Gonzales Design Partners
Ruth Gonzales
P.O. Box 97, 6823 — 211 Ih PL. NE
Arlington, WA 98223
Dear Ms. Gonzales:
This letter is being written in response to your letter regarding 7003 — 1561h St. SW
in Edmonds. Specifically, your letter is in response to a determination that was
made concerning setbacks and an addition that you are proposing for the residence.
Earlier this year you and I had discussed a Critical Areas Checklist Determination
of a "Study Required" for 7003 — 156 Ih St. SW in Edmonds. This determination
required that a topographic survey be submitted as well as a top of slope identified
for setback purposes. While this information appears to have been provided I now
understand that there is some confusion as to the definition of top of slope. I hope
that I am able to clarify exactly the required setbacks and how the city must
interpret a top of slope determination.
From the letter you submitted I understand that you have three concerns. First, you
are concerned that we are considering the entire slope and not just the slope within
your client's property lines. Second, I
Page: 2
North or East due to the park area. The above noted policy also states that permits can be
issued in areas suspect of landslide hazards if specific requirements are meet. Per the Soils
Report and the Survey the site has been established to be within acceptable limits and design
criteria for stable construction has been established. The Soils Report recommendations for
construction methods shall be incorporated into the construction documents, the structure
shall be designed and stamped by a Structural Engineer licensed in the State of Washington,
and reviewed by the Soils Engineer for compliance with the Soils Report.
Due to slope setback, BSBL, and the existing residences's location the lot area for expansion
is limited. The location of the proposed addition is based on the overlay of all required
setbacks onto the site and the existing residence's exterior and interior configuration. A 10'
side, rear and front yard setback apply to the entire perimeter of the property due to the flag
lot status of the site. The 25' slope set back greatly restricts the site use and eliminates +/-
65% of the total lot area. The addition as proposed meets the BSBL and the 25'-0" slope
setback per 1997 UBC Chapter 18. The 1997 UBC Section 1806.5.3 and Figure 18.1.1
indicate the footing setback requirement from the slope be measured 90 degrees to the
footing at the footing bearing elevation. The footing depth and angle of bearing influence when
measured at 90 degrees to the slope are greater than 26-0". Also section 1806.5.3 states
that for descending slopes over 1 to 1 slope use the maximum measure of 45 degrees.
Measured in an imaginary plane 45 degrees to horizontal projected upward from the toe of the
slope. By following these UBC requirements the line of the recommended footing depth and
the 45 degree slope intersect approximately 225'from the proposed addition, thus also
satisfying the UBC setback requirement.
Based on the Geotechnical Report, the Survey, the above information, and site plan the
proposed addition should not be subject to Steep Slopes Hazard Area requirements. The
proposed residential addition is a distance of 25'-O'from the slope when the setback distance
to the addition is measured at the footing depth per, 1997 UBC, Section 1806.5.3 and Figure
18-1-1 and the footing depth is increased as directed by Nelson - Couvrette's Geotechnical
Engineering Report. Therefore it is requested that the addition be designated incompliance to
the Steep Slope Hazard Area setback based on the slope setback measurements as
determined per 1997 UBC requirements and subject to the permit submittal requirements as
identified in The City of Edmonds Development Code, Section 19.05.
Thank you for your help in processing this application and I look forward to working with you
as this project progresses. If you have any questions please contact me at 360-435-5514.
Thank you,
Gonzales Design
/�a,riners
Ru E. Gonzales
Architect
enclosure: Revised Survey
gdp-98tp.1 1
(71
DRAWING:
SHEET: I OF I
TOE OF SLOPE
TOP OF BANK
—APPROXIMATE PROPERTY LINf. Fb `0N#4561 IN CASE
Top or 9N ELEV. 105.65
S'00*52'00" W 295.03'
S 00*11*49" E
20o7A2� -------------
25.00'
EDGE OF PAVEMENT N
6AT Ui
Iry
NO 95,01,
F1 57'52 07 P
0.3 E., 0. 2 0.5 E., 0.0 N.
/ I 1�11'lvj I
J
A
L
95.01
N 00*52'00" E 20il)
LEGAIL DESCRIPTION
2:0 t
PARCEL A:
The northerly 95 feet of the southerly 300 feet of� Trl-,1,.,�, 55,
Lund's Meadowdale Tracts, according to the plot
recorded in Volume 6 of Plats, page 26, records 'E`ohomlsh
County, Washington;
EXCEPT the westerly 194,75 feet thereof,
EXCEPT the south 5 feet conveyed to the City of
under Auditor's File #2027832.
PARCEL 8:
The northerly 105 feet of the southerly 205 feet c� Tr�jct 55,
Lund's kloodowdole Tracts, according to the plot
recorded in Volume 6 of Plots, page 26, records
'Ohomish
County, Washington;
EXCEPT the westerly 194.75 feet thereof;
ALSO the east 15 feet of the south 100 feet of t,-,,id f'i-act 55,
EXCEPT the south 5.0 feet thereof, conveyed to 01); "','y of
Edmonds under Auditor's File #2027832.
Situate in the County of Snohomish, State of
4�
CARPORt
71-7
HOUSE
PATIO'
TOP OF BANK
O� 3 E.. 0. 2 S.
REFERENCE SUR IT YS:
ROS #7708010226, VOLUME 5, PAGE 256
ROS #8702105001, V0LUME 24, PAGE 67
ROS #8708065002, VOLUME 25, PAGE 125
SURVEYOR'S NOTE S:
THE ORIGINS OF THE iWONUMENTS ALONG 156th
STREET ARE UNKNOWN. THE MONUMENTS
SHOWN APPEAR TO F,T EXISTZ SURVEYED
PROPERTY CORNERS. ANY ATTEM PT TO SET
PERMANENT PROPERT'� CORNERS WILL REQUIRE
FURTHER RESEARCH AND COULD AFFECT THE
POSITION OF THE APF'ROXIMATE PROPCRI'Y
LINES AS SHOWN.
20#
6ffE_9MMM=
0 10 20
�40
N 89*57'00" W ALONG CL OF 156th ST SW
PER PLAT OF LUNDS MEADOWDALE TRACTS
tn
IC)
VERTICAL DATUM
00
ASSUMED
LO
1.0111
TBM=105.65
Ito
0. 1 E. 0. 1 S.
FD '" BOAT S PIKE A T
172nd AVE PER
�?OS #6708065002
LEGE ND
0 FOUND REBAR & CAP #13041 PER ROS#8702105001 AS NOTED.
& CONTROL POINT
SPOT ELEVA77ON
C 11ARMSE IN & ASSOPTATES, INC.
ENGINEF, R S S UR VF, YO R S PLA NNE, R S
17614 - 162ND ST. SE (360) 794-7811
'POST OFFICE BOX 516 (206) 343-5903
IL MONROE, WA 98272-0516 (360) 794-9087 (FAX)
L NO
D`WN. BY: drs
CHIC BY: rfe
DATE: 10/29/98
JOB #: 98-186-07
F/B #: 609
SCALE: 1" = 20'
DRA�WING:
N 00-52*00" E
TOP OF BANK 0. 3 E.. OT2 6.5"E., 0.0, N.
r- - - - - --
CARPORT
A
go
to
\10
01,
V�v
7_
9&01�
N''00*52'00" t 200.02'
LEGAL DESCRIPTI10N
PARCEL A:,
The northerly 95 feet of the southerl)i 300 feet of TrOct 55,
Lund's Meadowdale Tracts, according to the plot thrcreof
recorded in Volume 6 of Plats, 'page -26V records �,4"snohomish
County, Washington;
EXCEPT the westerly 194.75 feet thereof;
EXCEPT the south 5 feet conveyed to the City of f,`,'d,onds,
under Auditor's File #2027832.�
PARCEL B.-
The northerly 105 feet 6f,the so'utherly'205 feet il Trict- 55,
;f
Lund*s Meadowdole Tracts, according to the plot f. "'Or"4v
recorded in Volume 6 of'Plots, page 26, records om ish
County, Washington,
EXCEPT the - westerly 194.75 feet thereof;
ALSO the e o'st '15 f6et of fhe`,souith. 100 feet' of ",,.,-act 55;.
EXCEPT the south 5.0 feet. thereof, cohveyed to of
Edmonds under Auditor'sFile #2027832.
Situate In the Couht.y'bl Snohomish, State,',of W �n�
77-77-7- -7-7-
7 7 777 7
20'
0 10� .90 -40,,
!Z1
N 89*57'00".Iff ALONG CL OF 456th'st SW
co
PER -PLAT OF LUND'S MEAI)OWDALE 'TRACTS.'
HOUSE
A
CONC.
HONCPATIO
VER 77CAL DA TUM
ASSUMED
Z
Lo
P
-TOP OF BANK
too
REFERENCT-1j' SURVE YS:
ROS #7708010226, VC)LUME 5, PAGE 256
ROS #8702105001, VOLUME 24, PAGE 67
ROS #8708065002, VOLUME 25, PAGE 125,
SURVTYOR'S'NOTES:
LEGEND
THE ORIGINS OF, THE tvIONUMENTS ALONG 156th
STREET ARE UNKNO1*1, THE MONUMENTS
0-1
F0UND.RE8AR,&,CAP, #11,3041 PER, ROS08702105001 AS NO*rt6.
SHOWN APPEAR TO FIT EXIS77NG SURVEYED,
PROPERTY CORNERS. ANY ATTEMPT TO SET
CONTROL POINT' -
PERMANENT PROPERTY CORNERS WILL, REQUIR E
FURTHER RESEARCH 'AND COULD AFFECT 7Ht,
+
SPOT'ELEVA,77ON
POSITION OF'THE APPROXIMAZ� PROPERTY
LINES, AS SHO WN.
WIMA
*151 WA
Am
;Art,S�Trlll
PRELIMINARY ENGINEERING
GEOLOGIC REPORT
STOLZENBURG ADDITION
EDMONDS, WASHINGTON
FOR
MR. DENNIS STOLZENBURG
i
NELSON- COUVRETTE & AssoclATEs, INc.
CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS
17311-135th Avenue NE, A-500
Woodinville, WA 98072
(425) 486-1669 - Fax 481-2510
October 1, 1998
Mr. Dennis Stolzenburg
c/o Gonzales Design Partners
P. 0. Box 97
6823-21 1 1h Place NE
Arlington, Washington 98223
Preliminary Engineering Geologic Report
Stolzenburg Addition
Edmonds, Washington
NCA File No. 241498
Dear Mr. Stolzenburg:
INTRODUCTION
Snohomish County (425) 337-1669
Wenatchee/Chelan (509) 784-2756
This report presents the results of our preliminary engineering geologic investigation at the site located at
7003 — 156h Street SW in Edmonds, Washington, as shown on the Vicinity Map in Figure 1. You have
requested. that we evaluate the existing site conditions, and provide recommendations for future
development and construction within the area. For our use in preparing this study, you have provided us
with a copy of the City of Edmonds Critical Areas requirements, a copy of the City of Edmonds letter,
dated March 20, 1998, an undated copy of a drawing titled "Slope Exhibit — Dr. D. Sto lzenburg", a copy
of a cross section titled "Stolzenburg", dated June 10, 1998, a copy of an undated, untitled site plan, and a
copy of a legal description and- information from a previous plat submittal.
The project consists of an addition to an existing one-story, single-family residence located near the top of
a steep slope. The addition will extend approximately 13 feet off the north side of the existing structure,
as shown on the Site Plan in Figure 2. The north end of the addition will be approximately 10 to 20 feet
from the top of the steep slope.
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 2
SCOPE
The services provided by NCA at this time are as follows:
I . Review existing soils and geologic maps, and related data.
2. Perform backhoe-excavated test pits and slope mapping at the site, to document the
subsurface. soils and ground water conditions.
3. Reduce field data through use of your provided site plan.
4. Present an evaluation of geologic hazards of existing site conditions and future site
development.
5. Provide an engineering geologic report discussing our findings, opinions and any
recommendations related to our analysis and findings.
SITE CONDITIONS
Surface
The project site consists of a rectangular- shaped parcel and is shown on the Site Plan in Figure 2. The
proposed addition is located above a steep, northerly slope overlooking Lunds Gulch. The southern
portion of the site is flat lying, landscaped, and is occupied by a single-family residence. The top of the
steep slope is located approximately 20 to 33 feet north of the residence. Approximately 10. feet below
the top of slope, a pathway has been benched into the hillside. This portion of the slope has also been
landscaped. Below the pathway, the ground slopes down steeply to Lunds Gulch. This portion of the
slope is vegetated with brush, ferns, deciduous trees, and scattered evergreen trees and old growth stumps.
We measured one cross-section (A -A') through the slope, as shown on Figure 3. The cross section was
measured using a hand-held clinometer and a 100-foot measuring tape. Below -the top of slope, the
ground surface slopes down at about 42 percent to the pathway. Below the pathway, the ground surface
slopes down at about 33 to 49 percent. About mid -way down the slope, the inclination steepens to
approximately 68 to 78 percent, and continues with this inclination to the toe of the slope. We measured
a total change in elevation on the order of 270 feet, with an average inclination of about 58 percent.
Geology
Most of the Puget Sound Region was affected by past intrusion of continental glaciation. The last period
of glaciation, the Vashon Stade of the Fraser Glaciation, ended approximately 10,000 to 11,000 years ago.
NELSON-COUVRETTE & ASSOCIATES, INC
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 3
Many of the topographic features seen today are a result of scouring and overriding by glacial ice. During
the Vashon Stade, the Puget Sound region was overridden by over 3,000 feet of ice. Soil layers
overridden by the ice sheet were compacted to a much greater extent than those that were not. A typical
glacial sequence includes recessional outwash sand overlying glacial till.
The geologic units mapped for this area are shown on the Preliminary Surficial Geologic Map of the
Edmonds East and Edmonds West Quadrangle, Snohomish and King Counties, Washington, by Mackey
Smith (U.S.G.S., 1975). The site vicinity is mapped as glacial till (Qvt), with Whidbey Formation (Qw),
and Double Bluff Drift (Qdb) mapped on the slope. Glacial till is a dense, unsorted mixture of sand, silt
and gravel deposited at the base of the continental glaciers. The Whidbey Formation is massive to bedded
silts, clayey silts and fine sands that were deposited in an interglacial lacustrine environment then over-
ridden and consolidated by the continental glaciers. Double Bluff Drift may consist of dense cemented
gravel in a silty sand matrix, pebbly glaciolacustrine silts, or massive silts with occasional small beds of
sand and gravel. Our explorations encountered fill and glacial drift. Glacial drift is similar to till, but
typically has some sorting, such as sand seams, and is less dense than till. We would expect that the
Whidbey Formation and Double Bluff Drift are located at depth underlying the drift.
Subsurface Conditions
The s ubsurface conditions at the site were explored on August 27, 1998. Two test pits were excavated
with a rubber -tired, tractor -mounted backhoe. The depths of the backhoe test pits ranged from 8 to 9 feet
below the existing ground surface. The approximate locations of the test pits are shown on the Site Plan
in Figure 2. A geologist from our firm was present during the explorations, examined the soils and
geologic conditions encountered, and maintained logs of the test pits. The soils were visually classified in
general accordance with the Unified Soil Classification System, a copy of which is shown on Figure 4.
The logs of the test pits, edited to reflect examination of soil samples in our laboratory, are shown on
Figure 5.
Our explorations encountered a surficial layer of sod approximately 0.3 feet in thickness. We
encountered approximately 2.5 to 3.0 feet of fill underlying the sod. The fill consisted of loose, fine to
coarse sand with silt, gravel, cobbles, a clay drain pipe, and roots. Underlying the fill, we encountered a
0.5-foot-thick layer of buried topsoil. The topsoil consisted of loose, silty fine sand with organics and
roots.
NELSON-COUVRETTE &ASSOCIATES, INC -
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Pag e 4
We encountered a 3-foot-thick layer of dense, fine to coarse sand with gravel and cobbles underlying the
buried topsoil in Test Pit 2. Underlying the buried topsoil in Test Pit I and the fine to coarse sand with
silt in Test Pit 2, we encountered dense, rust -stained silty fine to coarse sand with gravel and occasional
sand seams to the depths explored. We have interpreted these soils as glacial drift.
Hydrologic Conditions
Ground water seepage was not encountered in our test pit explorations or observed.along the slope face
during our site reconnaissance. We expect perched ground water conditions could develop during the
wetter months of the year. Perched water is a condition where water infiltrates through more permeable
soils, such as the fill and fine to coarse sand layer, then moves laterally along the surface of a less
penneable soil, such as the silty sand encountered in the drift. Perched water conditions are common for
upland areas underlain by till or drift, and tend to be seasonal. This type of, seepage condition tends to
decline markedly during the summer months.
GEOLOGIC HAZARDS
General
The area contains slopes between 33 to 78 percent that are underlain by glacial drift, and. inferred to be
underlain at depth by Whidbey Formation and Double Bluff Drift. We reviewed the Landslide Hazard
map from "Final Report, Landslide Hazards Investigation, Meadowdale Area, Edmonds, Washington", by
Roger Lowe Associates, Inc., dated October 16, 1979, to determine the landslide hazards that have been
mapped for the site. The Landslide Hazard map indicates that no hazards were identified in the southern,
flat -lying portion's of the site where the planned residential addition is located. The portion of the slope
that inclines down with 33 to 49 percent slopes was mapped as 3AO5. This means that the mapped area
has a 5 percent probability in the next 25 years to have a slump type failure in, material that has not
*previously failed. The upper portion of the slope that inclines down with 68 to 78 percent slopes was
mapped as 31302. This means that the mapped area has a 2 percent probability in the next 25 years to
have a debris slide type failure from encroaching landslide materials. The lower portion of the 68 to 78
percent slope was mapped as 2CO2. This means that the mapped area has a 2 percent probability in the
next 25 years to have a debris avalanche type failure from encroaching landslide materials.
NELsoN-COUVRETT E & AssocIA TEs, INC
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 5
Landslide Hazard
The core of the slope is inferred to be compromised of dense glacial drift, Whidbey Formation, and
Double Bluff Drift. These materials typically have high strength. We noted some soil creep at the site,
evidenced by some minor bowing in tree trunks. Deep-seated landsliding was not noted, and we expect
the site to be stable with respect to deep-seated slope failures. We expect the degree of soil creep is
largely controlled by the perched water flow through the more weathered soils. The potential of
landsliding affecting the structure on the site should not be significant.
Erosion Hazard
The erosion hazard criteria used for determination of affected areas include soil type, slope gradient,
vegetation cover, and ground water conditions. The erosion sensitivity is related to vegetative cover and
the specific surface soil types (group classification), which are related to the underlying geologic soil
units. The Soil Sury ey of Snohomish County Area Washington by the Soil Conservation Service (SCS)
was reviewed to determine the erosion hazard of the on -site soils. The surface soils were mapped by SCS
and classified as Alderwood-Everett (25 to 70 percent slopes) and Alderwood-Urban land complex (2 to 8
percent slopes) soils. We encountered glacial drift consistent with Alderwood soils during our
investigation. The erosion hazard for these soils is listed as being high for 25 to 70 percent slopes and
slight for 2 to 8 percent slopes.
Seismic Hazard
The seismic hazard is based on potential for liquefaction of the underlying soils. The site is underlain by
medium dense to very dense glacial drift/till. We expect the potential for liquefaction to be minimal for
structures founded on medium dense or better soils.
CONCLUSIONS AND. RECOMMENDATIONS
The City of Edmonds has designated the site as a critical area. , In our opinion, the subject site and the
moderate to steep slopes underlain by glacial drift, Whidbey Fori-nation, and Double Bluff Drift are
considered stable with respect to deep-seated slope failures. We did not observe any signs of significant
slope instability on the site. Seepage was not observed along the slope face at the time of our visit. In our
opinion, the 50-foot buffer requirement may be reduced by achieving an effective setback from the face
of the slope. These recommendations are outlined in the Structure Setback and Foundation
Embedments subsection of this report.
NELSON-COUVRETTE &ASSOCIATES, INC
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 6
Erosion potential for the site may be reduced if temporary erosion controls are implemented during
construction, and any areas disturbed during construction are recompacted and revegetated. Where
vegetation is not disturbed during construction, the erosion potential should not be significant. Care
should be taken during construction to keep concentrated runoff off the slopes. Following construction,
roof and footing drains should be tightlined to the bottom of the slope and dispersed to minimize erosion,
I
or directed to an appropriate stonn water system.
The soils likely to be exposed during construction are highly moisture sensitive and will disturb easily
when wet. We recommend that construction take place during the drier summer months. However, if
construction takes place during the wet season, additional expenses and delays should be expected due to
the wet conditions. Additional expenses could include the export of on -site soil and the import of clean
granular soil for fill.
Slope Protection
Protection of the setback and steep slope areas should be performed as required by the City of Edmonds.
It should be understood that the closer the site disturbance and development of the structure are to the
slope, the more risk there is of affecting slope stability. Care should be taken to minimize disturbance to
the slope face and to the native undisturbed soils between the house and the top of slope. Fill should not
be placed between the house and the top of slope, or over the s.lope.
From an engineering geologic standpoint, selective pruning and thinning of vegetation should. be
acceptable. Cutting and pruning of trees located on the slope can be performed, if allowed by the City,
but certain precautions should be taken. We recommend that the root bundle/stump of felled trees be left
in place. Pruned materials and debris should be removed from the area, and not allowed to remain on the
slope. Any disturbed areas should be immediately restabilized through vegetation planting or other
approved means. Placement of soil, sod, clippings or other matter on the slope is not recommended.
Of great importance to the long-term stability of the slope is the control of surface and near -surface water,
and erosion protection. We recommend that all drains, including foundation, roof and yard drains, be
directed away from the top of slope, and.outfall at an approved area. Drainage over the slope should not
be permitted without specific- recommendations.
NELSON-COUVRETTE & ASSOCIATES, INC.
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 7
Site Preparation and Grading
The first step of site preparation should be to strip the surficial sod, fill and buried topsoil to medium
dense to very dense native soils in building areas. This material should be removed from the site, or
stockpiled for later use as landscaping fill. The underlying soils are considered highly moisture sensitive
and will disturb easily and become difficult to work with when wet. At the exploration locations, the
depth to medium dense to very dense drift was approximately 3.0 to 3.5 feet. Site grading should not
significantly increase the risk of erosion or slope failure if normal erosion control procedures.are followed
and water is kept off exposed slopes.
Structure Setbacks and Foundation Embedments
Uncertainties related to building along the top of steep slopes and, in particular, unstable or actively
backwasting slopes are typically addressed by the use of building setbacks. The purpose of the setback is
to establish a "buffer zone" between the structure areas and the top of the slope, so that ample room is
allowed for normal slope recession during a reasonable life span of the structure (usually taken to be 50 to
100 years by Snohomish County). In a general sense, the greater the setback, the lower the risk. From a
geological standpoint, the setback dimension is based on the slope's physical characteristics, such as slope
height, surface angle, material composition, and hydrology. Other factors such as historical slope
activity, rate of regression, and the type and desired life span of the development, are important
considerations as well.
Based upon the conditions described above, it is our opinion that the slope is relatively stable, and the 50-
foot buffer requirement may be reduced, provided foundations are placed sufficiently deep into the dense
to very dense drift. This can be done by deepenin g the foundation on the steep slope side of the house to
below the natural inclination of the slope. We have interpreted the natural inclination of the slope to be
the 33 percent slope line as shown on the cross section in Figure 3. Footings should extend through the
fill and buried topsoil, and bear into the underlying dense to very dense drift below this line. This would
require a footing embedment of about 6 feet below the existing ground surface. The foundation can step
away from the slope, such that the effective setback is achieved. The reduced setback will need review
and concurrence by the City of Edmonds.
NELSON-COUVRETTE & ASSOCIATES, INC
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 8
Foundations
Conventional shallow spread footings are expected to be suitable for the structure founded into medium
dense to very dense native soils or structural fill extending to these soils. Design pressures, as stipulated
by the Uniform Building Code (UBC), should. be expected.
Specific design procedures for foundations and slab -on -grade may be dependant on final design. Specific
geotechnical issues could be delineated when final design is complete.
Structural Fill
All fill placed beneath buildings, pavements or other settlement sensitive features should be placed as
structural fill as required by the City of Edmonds codes. For the purpose of this report, structural fill is
defined as material that is placed in accordance with prescribed methods and standard and is monitored by
an experienced geotechnical professional or soils technician. Field monitoring procedures would include
th e performance of a representative number of in -place density tests to document the attainment of the
desired degree of relative compaction. The area to receive fill should be prepared as outlined in the Site
Preparation and Grading subsection of this report.
USE OF THIS REPORT
We have prepared this report of findings and preliminary recommendations for Mr. Dennis Stolzenburg,
and his agents, for use in this project. The scope of our work does not include services related to specific
construction activities, and final plans may dictate earthwork parameters. Since our work is considered
preliminary in nature, it should be understood that there are possible variations in subsurface conditions.
We recommend that project planning include contingencies in budget and schedule, should areas be found
with conditions that vary from those described in this report.
Within.the limitations of scope, schedule and budget for our services, we have strived to take care that our
work has been completed in accordance with the generally accepted practices followed in this area at the
time this report was prepared. No other conditions, express or implied, should be understood.
NELSON-COUVRETTE & ASSOCIATES, INC
Engineering Geologic Report
Stolzenburg Addition
October 1, 1998
NCA File No. 241498
Page 9
We appreciate the opportunity to be of service to you. If there are any questions concern.ing this report, or
if we can provide additional services, please call.
Sincerely
NELSON-COUVRETTE & ASSOCIATES, INC.
Lynn M. Ringstad
Staff Geologist
ul4dua- Y S4"�
Andrea L. Ernst
Proje eologist
David L. Nelson, PG
Professional -Engineering Geologist
LMR:ALE:DLN:kmn:nt
Four Copies Submitted
Five Figures
NELSON-COUVRETTE & ASSOCIATES, INC
tN Vicinity Map
B C D E
43§;7-/
1467-H
NORM BE H-1
148
FISHER
9TO
"N 150T� �4-
w5l-ST
-,T�?ND
Project
Site ll��TH
-1
6
z
L5nH
158TH
160TH- 159T,Lr
1.62.ND
7
164TH
IRWO09
NNI WOQD
6§TH
i167TH
168TH
CD)
r
_172ND
L11RD
01
17qL
H
CL
176TH
-J
11 79TH 0
X/
178TH
180TH
v V
@1995 Thomas Bros. Maps
FIGURE
NELSON-COWRETTE & AssocIATEs, INc.
Stolzenburg Addition
CONSULTING GEOTECHNICAL ENGINEERS, GEOLOGISTS
FILE NO.
DATE
AND EwIRONMENTAL SCIENTISTS
241498
October 1998
coreldmw\\dcinftymap\2414vic.doc
ion continues
Reference: Site Plan modified from an undated copy of a drawing provided by Gonzales Design Partners, titled "Slope Exhibit - Dr. D.
Stolzenburg".
Schematic Site Plan
(NOT TO SCALE)
LEGEND
TP-1
NUMBER AND APPROXIMATE
LOCATION OF TEST PIT
A A'
A A CROSS-SECTION A -A'
company%drafting\coreUrawksiteplan\2414sp.cdr
- 350
- 300
-250
- 200
- 150
- 100
- 50
- 0
Proposed
Addition
Scale: 1 50'
Horizontal & Vertical
Cross -Section A -A'
310
300-
250-
200-
150 -
100-
Stream 50-
0-
company%araTtingicoreiaravAcross secuonv
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS
GROUP
SYMBOL
GROUP NAME
GRAVEL
CLEAN GRAVEL
GW
WELL -GRADED GRAVEL FINE TO COARSE GRAVEL
COARSE -
GP
POORLY -GRADED GRAVEL
GRAINED
MORE THAN 50% OF
COARSE FRACTION
SOILS
RETANED ON NO. 4
GRAVEL
SIEVE
WITH FINES
GM
SILTY GRAVEL
GC
CLAYEY GRAVEL
MORE THAN 50%
RETANED ON
SAND
CLEAN SAND
SW
NO. 200 SIEVE
WELL -GRADED SAND, FINE TO COARSE SAND
SID
POORLY -GRADED SAND
MORE THAN 50% OF
COARSE FRACTION
SAND
PASSES NO. 4 SIEVE
WITH. FINES
SM
SILTY SAND
SC
CLAYEY SAND
SILT AND CLAY
INORGANIC
ML
SILT
FINE -
CL
CLAY
GRAINED
LIQUID LIMIT
LESS THAN 50%
SOILS
ORGANIC
OL
ORGANIC SILT, ORGANIC CLAY
MORE THAN 50%
PASSES NO. 200 SIEVE
SILT AND CLAY
INORGANIC
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
CH
CLAY OF HIGH PLASTICITY FAT CLAY
LIQUID LIMIT
50% OR MORE
ORGANIC
OH
ORGANIC CLAY, ORGANIC SILT
HIGHLY ORGANIC SOILS
PT
PEAT
NOTES:
SOIL MOISTURE MODIFIERS
1 ) Field classification is based on
Visual examination of soil in general Dry- Absence of moisture, dusty, dry
accordance with ASTM D 2488-83. to the touch
2) Soil classification using laboratory Moist- Damp, but no Visible water
tests is based on ASTM D 2487-83.
Wet- Visible free water or saturated,
3) Descriptions of soil density or usually soil is obtained from
consistency are based on below water table
interpretation of blowcount data,
Visual appearance of soils, and/or
test data.
NELsoN-CouvRETTE & AssoclATEs, INc.
UNIFIED SOIL CLASSIFICATION SYSTEM
CoNsa�'VINGGEOT�ECHNICAL ENGINEERS, GEOLOGISTS
AND ENVIRONMENTAL SCIENTISTS
FIGURE 4
I
LOG OF EXPLORATION
DEPTH
TEST PIT ONE
0.0-0.3
0,3-3,0
3.0-3.5
3.5-8.0
TEST PIT TWO
0.0-0.3
0.3-2.5
2.5-3.0
3.0-6.0
6.0-9.0
Usc SOIL DESCRIPTION
SOD
SW-SM GRAY -BROWN TO RUST -BROWN FINE TO COARSE SAND WITH,SILT, GRAVEL, COBBLES
AND CLAY DRAIN PIPE (LOOSE, MOIST TO DRY) JE!LQ
SM DARK BROWN SILTY FINE SAND WITH ORGANICS AND ROOTS (LOOSE, MOIST TO DRY)
(BURIED TOPSOIL)
SM GRAY -BROWN RUST STAINED SILTY FINE TO COARSE SAND WITH GRAVEL AND SAND
SEAMS (DENSE, MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 2.0 AND 5.0 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 8.0 FEET ON 8/27/98
SOD
SW_SM GRAY -TAN TO BROWN FINE TO COARSE SAND WITH GRAVEL, SILT, COBBLES AND ROOTS
(LOOSE, MOIST TO DRY)
SM BURIED TOPSOIL
SW. TAN -BROWN FINE TO COARSE SAND WITH GRAVEL AND COBBLES
(DENSE, MOIST) (DRIFT)
SM GRAY -BROWN TO GRAY RUST STAINED SILTY FINE SAND WITH GRAVEL
(DENSE, MOIST) (DRIFT)
SAMPLES WERE COLLECTED AT 1.0, 4.0, 6.5 AND 8.5 FEET
GROUND WATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 9.0 FEET ON 8/27/98