Loading...
7030 210TH ST SW.PDF111111111111 2665 7030 21 OTH ST SW ,f,CITY OF EDMONDS PUBLIC WORKS DEPARTMENT FOR INSPECTION CALL Permit 661" 01� SIDE SEWER PERMIT 775-2525 Ext. 220 Issue Date PEP -MIT MUST BE POSTED ON JOB S] 1. Address of 70nstructionA767�)o ca'mk 2. Property Legal Description (include all easements) mo - I c' .3. Single Family Residence Multi�-Family No. of Units Commercial 4. Owner and/or Builder YIA BALLINGER 5. Contractor & License No. 6. Invasion into City Right -of -Way: No Yes (If Yes Right-of- way Construction Permit Required Call Dial Dig (342-5344) before excavation). 7. Cross other private property: Yes No Easement required 1:14 attach legal description and county easement number. READ THE FOLLOWING AND SIGN: STREET FLE bw a. Property owners must obtain a permit to inst ' all 'I on their property. A licensed side sewer contractor mustCA U810SO construct side sewers in the public right-of-way. b. The side sewer contractor assumes full reponsINK YPY rt" dQ1A installation for one year. 1-800-562-6478 C. Commercial establishment requires a minimum or a six inch (6") side sewer line. t d. Side sewers may not be installed closer than thirty inches (30") to any structure. e. Side sewer lines must be laid at a minimum grade of 2% (1.150) and maximum grade of 100% (45'). 0 f. No turn in side s8wer greater than 45 (1/8-bend) is 0 allowed between cleanout. All 90 turns must be constructed of a 45 (1/8 bend) and wye with removable cap. g. No down spouts, footing drains or floor drains can be connected to side sewer system. h. Pea gravel is required for bedding when installing sewer lines through other than granular soil. i. Cleanouts are required at 30"-60" from each plumbing exit line and at minimum intervals of 1001 along sewer line run. j. Trenches within City right-of-way must be*restored to original conditions. Contractors shall be responsible for right-of-way failure due to poor compaction of fill. k. Side sewer must be left uncovered until inspected and approved by the City. 1. Inspection during normal working hours only. Two (2) working days notice required. DATE: I certity that I have read and shall comply With the above PERMIT FEE: 00 CONNECTION FEE: So - 00 DISAPPROVED BY: Date: By: Date: APPROVED By: ate: /,?I rz PERMIT MUST BE TED ON JOB SITE The City of Edmonds Side Sewer Drawing EASEVE"�-T NO. NEW CONSTRUCTION E] REPAIRS L/ID NO . ....... � I ........... . ASMT. NO OWNER JOB ADM9-SS—:1�17 ...... ..................... --------- ---- n< P u,c, F" CONTRACTOR 11 . ............... PERMIT NO . ........... I V LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . ......... k , iv ...................................................................... ........................... ------------- ............. ...... ---------------------- NAME OF ADDITION f ---------- ................... 0 . ................................ j� 0 ko rll Approved: PWW-OG01 -11/75 (REV. 11/78) DATE ............................................ BY ------------------------------------------------------------- 0 I Side Sewer Drawing I he %.!Ty or camonus —lo ..................... EASEMENt" 6 NEW CONSTRUCTION REPAIRS LID NO. ASMT. NO. ............. OWNER V-.f — — ------------------------------------------------- CONTRACTOR --- t-L -.e-- -k� ........ ............................................ PERMIT NO . .................... VIA 13AL�INGER JOB ADDRESS ... ....... e ..... 70,3-Z --- - --- '7.62.:271t/ LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO . ...tIFT"->IATIC)tq .................................................................................................................................................................. .6 PWW-0001-11/75 (REV. 11/78) �ld y NAMEOF ADDITION ....................................................................................................................... 0 31 IT Approved: DATE.... ................. ............. .. CITY OF EDMONDS , PUBLIC WORKS DEPA04ENT SIDE SEWER PERMIT FOR INSPECTION CATA Permit N? 775-2525 Ext. 2�O Issue Date PEP -MIT MUST BE POSTED ON JOB SITE 's-r- Uj - 9 go 1. Address 0 onstruction -70:30 a*1d 7032 =17 2. Property Legal Description (include all easements) Wc�--L oF .6 6 D- V. UE). 1--C-r NO 3. Single Family Residen e — M lti-Family No. of Units Commercial — (-2'- U 14' I. ld "" �F- _D4+ e_ 4. Owner and/or Bui er 5. Contractor & License No. LOWAjeyd 6. Invasion into City Right -of -Way: No �� Yes (If Yes Right-of- way Construction Permit Required - Call Dial Dig (342-5344) before excavation). E-4 7. Cross other private property: Yes No ),�Easement required - U attach legal description and county easement nuVfflE`----T HLE H �4 READ THE FOLLOWING AND SIGN: C14 a. Property owners must obtain a permit to install side sewers on >-I their property. A licensed side sewer contractor must be employed to construct side sewers in the public' right-of-way. b. The side sewer contractor assumes full reponsCALL48 NVJRSch P installation for one year. �A c. Commercial establishment requires a minimum6FFQ&ExYWhDj( 11) side sewer line. I . - 8LOA- 5§1-0 A 78( 0 d. Side sewers may not be installed closer than tHi y es 30") U to any structure. W 0 M e. Side sewer lines must be laid at a minimum grade of 2% (1.15 0 and maximum grade of 100% (450). 0 E-4 f. No turn in side s8wer greater than 45 (1/8,bend) is 0 allowed between cleanout. All 90 turns must be constructed of a 45 (1/8 bend) and wye with removable cap. g. No down spouts, footing drains or floor drains can be connected to side sewer system. h. Pea gravel is required for bedding when installing sewer lines through other than granular soil. i. Cleanouts are required at 30"-60" from each plumbing exit line and at minimum intervals of 1001 along sewer 'line run. j. Trenches within City right-of-way must be restored to original conditions. Contractors shall be responsible for right-of-way failure due to poor compaction of fill. k.. Side sewer must be left uncovered until inspected and approved by the City. 1. Inspection during normal workin ours only. Two (2) working days notice required. DATE: mc In I certify that I havA,read and shall comply with the above rPERMIT FEE: �4 W '"n CONNECTION FEE: 50, 00 DISAPPROVED BY: Date: By: -Date: APPROVED By: Date: 0 IZ * PE IT POSTED ON JOB SITE