Loading...
704 FIR ST.PDF11111111111111 11272 704 FIR ST ADDRESS: TAX ACCOUNT/PARCEL NUMIBER: oo&jqqt)c)c1()1o(D, BUILDING PERMIT (NEW STRUCTURE):.. I�M�6 COVENANTS (RECORDED) FOR: CRITICAL AREAS:— 7- 4,l DETERMINATION: [] Conditionat Waiver 0 Study Required XWaiver DISCRETIONARY PERMIT DRAINAGE PLAN DA' PARKING AGREEMENTS DATED: EASEMENT(S) RECORDED FOR: PERMITS (OTHER): PLANNING DATA CHECKLIST DATED: -f -?-f SCALED PLOT PLAN DATED: 7-to-q3 SEWER LID FEE $: LID ff: SHORT PLAT FILE:,�? 2S- LOT: BLOCK: SIDE SEWER AS BUILT DATED: - SIDE SEWER PERMIT(S) #: 3 fa GEOTECH REPORT DATED: STREET USE / ENCROACHMENT PERMIT #: WATER METER TAP CARD DATED: OTHER:ROWIS-25wift) [�DW 9S- 2(ol (d6oam) 1�ow 6)0,2fq6nw) LATEMP\DS'Vs\Fonns\Street File Checklist.doc LLrr t F::r D. A� i �IioKr PL.-T- CIT*f 01= S'Mm0W1Doj bf*'�* ,5v.301-jo"L,5" co-, 4�3A�-- pvrPeTv em5rX77P A,4JPWt' Mt37— G/ FIR 5TREE-r' HIE7jG-1+-r CALC-5 c 18.q ID I ct f-.Z TOT'A, L 7qo.? +4= 1 73 2.12-73 f)r '70 P P, 6T, q 40 0 IRF-mo pi— LOT- 4?,r-A k eT -/ e, WRA&A 1, 5U, 2,y % Y:p + jjjeFAec- &You/, XM6 fiewE RECEIVED t JUN 17 11-0110 DEVELOPMENT SERVICES CTR. Z, Py CITY OF EDMONDS tCrVAL- CITY* EDMONDS - 1215" AVENUE NORIOEDMONDS, WA 98020 PHONE: 425.771.0220 - FAX: 425.771.0221 - WEB: www.ci.edmonds.wa.us DEVELOPMENT SERVICEs DEPARTMENT: PLANNING - BUILDING June 23, 2010 Susette Coustette-Hardy 704 Fir Street Edmonds, WA 98020 RE: PLAN REVIEW COMMENTS FOR PLAN CHECK # 2010-0408 SFR REMODEL AT 704 FIR STREET Dear Ms. Coustene-Hardy, I have reviewed the above building permit application on behalf of Planning Division and while I have approved the permit, I wanted to bring one concern to your attention regarding the proposed remodel. In reviewing the plans, I noticed that a wet bar is to be installed in the updated basement area. Wet bars are certainly allowed as part of entertainment areas, rec rooms and the like, but their inclusion in a remodel can indicate the possible intent to use a space as a 'mother- in-law' type unit. This building permit does not allow the use of the downstairs space as an Accessory Dwelling Unit (ADU). If you plan to use the downstairs at some point as an ADU, a separate ADU permit is required according to Edmonds Community Development Code Chapter 20.21. If you have any questions, please contact me at (425) 771-0220. Sincerely, zo",_ 4 � �� � Mike Clugston, AICP Planner - Cc: Mark McDowell 12345 Lake City Way NE, #223 Seattle, WA 98125 ^9="% Z51 KEET FILE The Comprehensive Plan as well as the Edmonds Community Development Code (ECDC) and related development documents are available at: h=://www.ci.edmonds.wa.us/plan div.stm. U CITY OF EDMONDS CONSTRUCTION PERMIT APP.LICATION USE PERMIT ZONE 6, NUMBER 9 -_30456 ADDRESS 7L,, 41 SUITE/APT, OWNE7 ,k _WLI;S1"NE e LEGAL DESCRIPTION CH7UBOiVISION NO LID NO, MAILING ADDRESS �A PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP EXISTING — REOUIREO DEDICATION —POSED TESCIP Approved RW Permit Requ,red Street Use Permit Req.d 1 ISmspection Required dewalls Required .0 "t—­ NUMBER —7 NAME zz�� REMARKS 776// ril,�A 15 ADDRESS CITY 'ZIP —JTELEPHONE IP F_ 77— 'ir r NUMBER 741 q7,C1 //)5;76111/' 5 , —/-, </ NAME 1415�_A/ge-7 ENGINEERING MEMO DATED REVIEVI ADDRESS METEYYE # BUILDING SUPPLY SIZE I j /I I NO� OF FIX�JES I 11PI ATI CAT TE CENSE NUMBER E I /X . r—r Lor IF 11 �T SIGN AREA SEPAREVIEW A N 0. Le2ga Description of Property - include easemehts I ALLOWED PROPOSED C.�PLETE 1� k "'J( Z I — / -1 Z, C/ " - ? JEXEMPT SHTELINE 0 0 4!17 EXP 4­ VARIANCE OR CU REVIEW BY SETBACKS —FEET HEIGHT Property FRONT sloe REMARKS REAR JLOT,COVER To Account Psit�'el No. 2'-;111 19"RESIDENTIAL 10PLUMBING IADDITI 1:1 20MECHANICAL ON COMMERCIAL ElREMODEL E] APT, SLOG. SIGN FENCE CHECKED BY TYPE OF CONSTRUCTION CODE El REPAIR CYOS. I x _FT) OCIDSTOVE SWIM POOL DEMOLISH INSERT Ho 11 W El T TUB/SPA S 11ti. 0 CCUPANCY JOCCUPANT RPEC Eat EDINSPECTOR JAREA GROUP LOAD 0 RETAINING WALL/ 1:1 I ROCKERY RENEWAL REMARKS (TYPE OFV;LEBus S OR ACTIYITY,) AIN: PROGRESS INSPECTIONS PER, UBC 305 Z NUMBER NUMBER OF CRITICAL -Y4 MI kW-e-- V1,16? 0 OF DWELLING AREAS INUMBE 03 STORIES UNITS DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN) /Sv—smul r _!�F CYAV It FINAL INSPECTION REQUIRED VALUATION FEE PLAN CHECK FEE 7 HFATSOURCE: GLAZING BUILDING IN) LUMOING 9 P, Plan Check No. 7 MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL Any Construction on the public domain (curbs, sldewplks,, driveways, marquees, etc.) will require separate permission. STATE SURCHARGE 0 Permit , Application: 180 Days Pairmit Limit: I Year - Provided Work Is Started Within 180 Days . STORM DRAINAGE FEE C "Applicant, on behalf of his or her spouse, heirs, assigns and ENO. INSPECTION FEE 170 successors in Interest, agrees to indemnity, defend and hold harmless the City of Edmonds, Washington, Its officials, I employees, and agents from any and all claims for damages of whatever nature, arising directly or Indirectly from the Issuance a of this permit. Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT PLAN C' ' C K mo dify, waive or reduce any requirement of any city ordin 0 x I :nC: nor limit in any way the City's ability to enforce any Ord n nC TOTAL A M TOTAL AMOUNT DUE provision." f7 I hereby acknowledge that I have read, this application; that the ATTENTION ATTE APPLICATION APPROVAL information given is correct; and that I am the owner, or the duly �fE authorized agent of the owner. I agree to comply with city and THIS PERMIT state laws regulating construction; and in doing the work authoriz. AUTH DRIZES This application is not a permit until ed thereby, no person will be employed in violation of the Labor ONLY THE signed by the Building Official or his/her ode of t State of Washington relating to Workmen's Compensa- WORK NOTED Deputy; and fees are paid, and receipt is tion Insurlace. INSPECTION acknowledged in space provided. ) (OVVNER/ T DATE SIG E . EPARTMENT D OFFICIAL's SIGNATUR�, DATE N�ATE e7) o CITY OF C IT� .:�.EN OM, EDMONDS CALL FOR_��'Re� �SE 6ATE ATTENTION INSPECTION I -7 - IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE 771-0220 UNTIL A F:NAL INSPECTION HAS BEEN MADE AND APPROVAL OR ORIGINAL — File YELLOW — Inspector �,,CERTIFCATE OF OCCUPANCY HAS BEEN GRANTED. UBC ­­ , ...... I. ­ —.1 . � ­­, 0 51TE 'P L'/-\ N1 OT t Or 1D. X. j A"c-v"so V,) * 'SHOTOOL&T r-lTlf S'MMOW105 5FfP APPROVED BY PLN 65 I lzoo Piper T,7A.TV04 FIR '5TREE-F . ---L454�. 5C&Le; 1. 2�0' o'� J"4145-A A N H e C— 4 T CtLC!S —TSW' etxv— A 19 c- -3 200.0 c rD Cl (-.7 TOT -A, L 7qO.? +4 l(LI773 I t;Z .7 -3 MA.)� < in ACCEPTABLE TIGHTLINE MATERIAL N-12 ADS Sch 40 PVC SnR .1.5 fASTM D30" So. 0 FUIjLl(, WlikK.S I it-wo 0 0 PLANNING DATA NAME: SITE ADDRESS: -70q DATE:--7/V,/ff— ZONING: V_CD—(0 PLAN CHK#:qq PROJECT DESCRIPTION: CORNERLOT -b—(Yes/No) FLAG LOT Yes/No) __N 0) - ___ _( SETBACKS: Required Setbacks: Front: 9-0 Left Side: Right Side: Rear: Actual Setbacks: aww& Front: -:� `1 Left Side: Right Side: Rear: Street map checked for additional setback required? — We—s/No) _NR . .... T LEGAL NONCONFORMING LAND USE DETERMINATION ISSUED (Y/N) LOT COVERAGE: Maximum Allowed:. Actual: BUILDING HEIGHT: ­17 o,,- / Maximum Allowed: L,�'D —Actual Height: Datum Point: Datum Elevation:— A.D.U. CREATED?: SUBDIVISION: (A CRITICAL AREAS #: qz— SEPA DETERMINATION: LOT A OTHER: Plan Review By: ckfileApan0^p1andaduc 9critical Areas Checklit RECEivEo MAY 8 1992 Site Information' Project Name: F,�2 ':-�'��ermit Number: PERW COUNTER Site Location: V Property Tax Account Number Approximate Site Size (acres or square feet): --Z6 4 Have you filled out a Critical Areas Checklist for a project on this site before? General Site Conditions 1. Has the site been cleared or logged? --- Y-6 Date of most recent action- 0-6 Soils / Topography 2. In the Snohomish County Soil Survey, what is the mapped soil type(s)? -//?WD e'�ffptrze- 3. Describe the general site topography. Check all that apply. Flat: less than 5 feet elevation change over entire site. X----Rolling: slopes on site generally less than 15% (a vertical rise of 10 feet over a horizontal distance of 66 fa:L) —Hilly- slopes present on site of more than 15% and less than 30% ( a vertical rise of 10 feet of horizontal distance.) ----$teep: grades of greater than 30% present on site. Comments Hydrology/Vegetation 4. Site contains areas of year-round standing water: /70 5. Site contains areas of seasonal standing water /) CI Approx. Depth: 6. Site is in the floodway floodplain P t-, of a water course. 7. Site contains a cree or an area where water flow�,across the grounds surface? Zle-5-flows are year-round? �, -,��Flows are seasonal? /U 8. Site is primarily: forested meadow _;shrubs — ;mixed �&4 P- fs 9. Obvious wetland is present on site: 10. Wetland inventory or map indicates wetland present on site: 11. Critical Areas inventory or map indicates any Critical Area on site: OF 90 -199- City of Edmonds Critical Areas Checklist The Critical Areas Checklist contained on this form is to be filled out by any person preparing a Development Permit Application for the City of Edmonds prior to his/her submittal of a development permit to the City. 17he purpose of the Checklist is to enable City staff to determine whether any potential Critical Areas are or may be present on the subject property. The information needed to complete the Checklist should be easily available from observations of the site or data available at City Hall (Critical Areas inventories, maps, or soil surveys). RECEIVED MAY * 8 1992 PERMIT COUNTER An applicant, or his/her representative, must fill out the checklist, sign and date it, and submit it to the City. The City will review the checklist, make a precursory site visit, and make a determination of the subsequent steps necessary to complete a development permit application. W'ith a signed copy of this form, the applicant should also submit a vicinity map of the parcel with enough detail that City staff can find and identify the subject parcel(s). In addition, the applicant is encouraged to include any other pertinent information or studies in conjunction with this Checklist to assist staff in completing their preliminary assessment of the site. I have completed the attached Critical Area Checklist and attest that the answers provided are factual, to the best of my knowledge (fill out the appropriate column below). Owner / Applicant: .'14 /// Aewz-161 Narne . e&- 9 A /,-- 1,7 Title - ovl 9 De -T1--7yjoe D/ Zv, Street Address Applicant Representative: Naine Title Street Address oAlz)::� A) A '51S�6 2 1 ZIP City, State, ZIP Phone 7 79e> Pl!—!�..e 7� /Dafe Signature Date MEMORANDUM CrrY OF EDMONDS PLANNING DRqSION June 10, 1992 TO: JEFFREY S. WILSON, AICP, CURRENT PLANNING SUPERVISOR CA-92-45 FILE FROM: JOHN BISSELL, CODE ENFORCEMENT TECHNICIAN SUBJECT: CRITICAL AREAS STUDY, CA-92-51 I have reviewed the site located at 704 Fir street. There is a mapped class 2b stream crossing the southern portion of the property just off the site. The required 25 foot buffer and the required 15 foot setback appeared to encroach into the building area of the subject property. Therefore the applicant was required to provide the City with a survey delineating the stream bank and showing that the house would meet the required stream setback. Ile survey creating the subdivision was made on 5/16/91. At the time of this survey the City required that the surveyor delineate the location of the top of the stream bank. The applicant provided the City with a copy of this survey and a copy of a site plan showing how he would meet the setback requirements. Therefore the required study has been completed. I recommend that the following condition be required with the approval of a building permit for the subject site: 1. The applicant provide the City with a Landscaped Green Belt Easement for the portion of the property within 25 feet of the stream bank. This easement must state that no construction or alteration of the 25 foot stream buffer is allowed. This easement must be recorded with the Snohomish County Recorder's office prior to the issuance of a building permit. 2. The applicant must provide the City with an easement stating that no structures are allowed to be built within 15 feet of the 25 foot stream buffer. This easement must be recorded with the Snohomish County Recorder's office prior to the issuance of a building permit 3. The applicant must provide the City with a Landscape Plan and with a statement that the area within 25 feet of the stream will be landscaped with native vegetation prior to the final occupancy approval of the building permit. The landscaping plan must also state that the building setback will be landscaped with erosion resistant plants prior to final occupancy approval of the building permit. 4. The applicant shall retain the filter fabric fence along the west property line until the completion of all construction and landscaping. 5. The applicant shall provide the City with a two year maintenance bond for the maintenance of the landscaping within the stream buffer area. This bond shall be provided prior to the final occupancy approval of the building permit. 6. If the applicant is granted a variance on the subject lot, the preceding conditions should be modified to meet the requirements of the variance. If you concur with these recommendations, please indicate your concurrence in the space provided below. Current Planning Supervisor I . 0 0 MEMORANDUM CITY OF EDMONDS PLANNING DIVISION To: City Council Via: Mayor Hal"�'r From: Robert Chave, lanning Manager exl—� Subject: Critical Areas: Status of Mike Arnim Project Date: July 1, 1992 I understand from the Council comments during the June 23rd meeting that there may still be some questions about the status of Mr. Arnim's project and the effect of the city's critical areas ordinance. I hope the following will summarize the situation as it stands today. I would be happy to answer any fiirther questions either individually or in a more formal presentation to the Council. Mr. Mike Arnim appeared before the Council atits May 18th meeting and presented a situation in which he felt he had been "caught" by the new critical areas ordinance. Mr. Arnim had undergone SEPA review as part of the process of obtaining approval for his short plat, and had even reserved the buffer that the critical areas ordinance now required. However, because of the critical areas ordinance requirement of an additional building setback, he needed to obtain a variance from this critical areas standard before being able to obtain a building permit. Mr. Arnim applied for the variance, but brought the issue to the Council to see if another remedy could be found. In response to Mr. Arnim's concern, staff brought back a set of recommendations for the Council to consider at its June 9th meeting (this was a committee meeting night� but the issue was discussed by the full Council before adjourning to committees). 'Me Council supported the staffs proposal to exempt plats that had undergone SEPA review and were approved in the year prior to adoption of the Critical Areas Ordinance. This revision of the vesting provisions was drafted as a code amendment and was approved by the Council at its June 16th meeting (Ordinance 2885). The effective date of the ordinance was June 26th. As a result of the adoption of the new vesting provisions, Mr. Arnim's entire plat on Fir Street is now exempt from the Critical Areas Ordinance; he does not need to undergo critical areas review or obtain any critical areas variances to proceed with his development (he still needs to obtain the usual building permits, however). Mr. Arnim withdrew his variance request, and his application fee was refunded. We began finalizing his building permits, although we could not legally approve the permits until the effective date of the ordinance which exempted him from the critical areas review. On June 27th, Mr. Arnim picked up his approved building permit for his lot at 708 Fir Street, the lot which had originally needed the variance but was now vested and exempt from the critical areas ordinance. CASMDOC July 1, 1992, Page 2 0 0 I believe all concerned, including the Council, stA and Mr. Arnim, felt that the revised vesting provisions were a reasonable solution to the problem that Mr. Arnim's case highlighted. On balance I think the City responded very rapidly to the problem and implemented an appropriate solution within a very short period of time. During the discussion at the Council's June 9th meeting, staff also alerted the Council that there were other provisions in the Critical Areas Ordinance that we felt needed to be examined. The Council concurred that these and any other critical areas concerns should be referred to the Planning Board for review. Ilese items are being placed on the Board's extended agenda, and will be reviewed after we get through our pending public meetings on the Comprehensive Plan (the public open houses) and other scheduled business. In surn, Council and staff agreed during the adoption process for the critical areas ordinance'that a trial period was needed to gain experience with this type of regulation. In fact, a sunset proivision was adopted so that there would be certainty that the ordinance would be reviewed (the sunset date is July 1, 1994). The reason that Mr. Arnims case received immediate attention was that it pointed out a problem that needed immediate attention, and was clearly consistent with the intent of the ordinance. We would be happy to consider any similar problems that need immediate attention; in any case, we will soon begin the process of working with the Planning Board to identify provisions of the critical areas ordinance that need adjusting but are less urgent in nature. CITY OF EDMONDS SIDE 8 9 0 9 Address of Construction: Property Legal Description (Include all easements): 77 Owner and/or Contractor: 6E� State License No."A) e66 - /7 / b Building Permit No. J20< gle Family C3 Multi -Family (No. of Units-) Commercial Public t, SEMER PERMIT N 2 PE.,RMIT 8 5 C 6 PUBLIC WORKS DEP' Invasion into City Right -of -Way: R<o 13 Yes RW Construction Permit No. Cross other Private Property: U-<o E] Yes Attach legal description and copy of recorded easement I certify tha�t I-h'ave read and shall comply with all city requirements as indicated on the back of the Permit Card. An Datj / . * CALL DIAL -A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION * OFFICE USE ONLY FOR INSPECTION CALL 771-3:902, PUBLIC WORKS DEPT. Permit Fee: Issued By Trunk Charge: 155? Date Issued: Assessment Fee: Receipt NI Lid No Partial Inspection: Date -initial Comments Reason Rejected: Date -Initial Final Inspection Approved: Datex__/_0_11nitiaK�2. ** PERMIT MUST BE POSTED ON JOB SITE ** White Copy: File Green Copy: Inspector Buff Copy: Applicant Revised 3!90 I Side Sewer Drawing The City of Edmonds EASEMENT NO - --------------------------- ------------ NEW CONSTRUCTION REPAIRS r-1 LID NO . .................. IASMT. NO - ----------------- f) ( OWNER------------------------------------------------------------------------------------------------ CONTRACTOR ------------------------------------------------------------------------------------ PERMIT NO. JOB ADDRESS --70--L� ---------- ------ ----- ------------------------- LEGAL DESCRIPTION- LOT NO - -------------------------------------- BLOCK NO - ------------------------------------ NAMEOF ADDITION ---------------------------- .......................................................................... r F k�, S—\ . I f PWW-0001 -11/75 (REV. 11/78) - �r'c- Approved: DATE/t,4.70 ?.� ................ By A L .4111 C. October 18, 20?2 5r%9 CITY OF EDMONDS 121 5TH AVENUE NORTH * EDMONDS, WA 98020 - (425) 771-0220 *- FAX (425) 771-0221 Website: wwwci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT Planning - Building - Engineering (314/05) Dave Hardy 704 Fir Street Edmonds, WA 98020 Dear Dave: RE: Pedestrian Bridge/Street Vacation GARY HAAKENSON MAYOR As promised I am following up on your letter of July 9, 2002 regarding the proposed pedestrian bridge adjacent your property and street vacation. Funds for the construction of the pedestrian bridge are currently available within the Parks Department budget. The bridge has been designed by City engineering staff. I am arranging a meeting with the State Department of Fish and Wildlife to determine hydraulic perrrdt requirements i Technically the: street vacation does not have to be completed first before the construction of the traillbridge. There is sufficient room to construct the bridge and trail given the existing pedestrian easement and right-of-way. For consistency purposes, I now believe the city should retain a 10 foot pedestrian easement but the trail may be less than that width. The steps in the street vacation process are summarized as follows: • The City Council passes a motion initiating the street vacation. • The City Clerk will schedule a public hearing. • After the public hearing, the City Council would, assum . ing they concur with vacating the right-of-way, adopt a resolution to vacate by ordinance provided that within 90 days payment for the vacated property is made to the city. Attached for your information is a copy of Chapter 20.70 of the Edmonds Community Development Code (ECDC) which contains the exact code language. If the street vacation is approved you will not be required to re-record your short plat map. All required easements will included in the recorded street vacation ordinance. Your property taxes should not be impacted. The City will record the ordinance. Because your proposed fence is located within a critical area buffer, you will needa critical areas alteration permit along with a fence permit. Star Campbell has been assigned from the Planning Division to be your contact on the critical areas perrrdt. Once the critical areas permit this is completed, you can apply for your fence permit consistent with you.3?pproved critical areas plan. If yo e any fifurt7her uestions, please feel free to call me at 771-0220. S i erel L, Du V. Bowman Development Services Director Cc: Rob Chave, Planning Manager Star Campbell, Assistant Planner Arvilla OhIde, Parks Director Jeannine Graf, Building Official tAlogomm Incorporated August 11, 1890 Sister City - Hekinan, Japan JITREET CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 - (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT 9'�J Planning - Building - Engineering October 18, 2002 Dave Hardy 704 Fir Street Edmonds, WA 98020 Dear Dave: RE: Pedestrian Bridge/Street Vacation FILE GARY HAAKENSON MAYOR As promised I am following up on your letter of July 9, 2002 regarding the proposed pedestrian bridge adjacent your property and street vacation. Funds for the construction of the pedestrian bridge are currently available within the Parks Department budget. The bridge has-been designed by City engineering staff. I am arranging a meeting with I the State Department of Fish and Wildlife to determine hydraulic permit requirements Technically t4 street vacation does not have to be completed first before the construction of the trailibridge. There is sufficient room to construct the bridge and trail given the existing pedestrian easement and right-of-way. For consistency puiposes, I now believe the city should retain a 10 foot pedestrian easement but the trail may be less than that width. The steps in the street vacation process are summarized as follows: • The City Council passes a motion initiating the street vacation. • The City Clerk will schedule a public hearing. • Afterthe public hearing, the City Council would, assuming they concur -With vacating the right-of-way, adopt a resolution to vacate by ordinance provided that within 90 days payment for the vacated property is made to the city. Attached for your information is a copy of Chapter 20.70 of the Edmonds Community Development Code (ECDC) which contains the ex , act code language. If the street vacation is approved you will not be required to re-record your short plat map. All required easements will included in the recorded street vacation ordinance. Your property taxes should not be impacted. The City will record the ordinance. Because your proposed fence is located within a critical area buffer, you will need a critical areas alteration permit along with a fence permit. Star Campbell has been assigned from the Planning Division to be your contact on the critical areas permit. Once the critical areas permit this is completed, you can apply for your fence permit consistent with youqo�approved critical areas plan. any ftirther uestions, please feel free to call me at 771-0220. Du -hi-& V. Bowman Development Services Director Cc: Rob Chave, Planning Manager Star Campbell, Assistant Planner Arvilla Chide, Parks Director Jeannine Graf, Building Official Incorporated August 11, 1890 Sister City - Hekinan, Japan 06/24/2003 TUE 13:23 FAX r I 36075184 INURWEST CONSTRUCTION HYDRAULIC PROJECT APPROVAL RCW 77.55.100 - appeal pursuant to Chapter 34.05 RCW F: .0 r Q002/005 State of WasMigton Department of Fish and Wildlife Region 4 Offike 16018 MW Creek Boulewd Wil Creek Waslkiqton 99012 DATE OF ISSUE: May 22. 2003 M A Y 2 8 -4, LOG NUMBER: ST-1`2250-01 INC. STREET FILE PERMITTEE City of Edmonds ATTENTION: Rich Lindsay 700 Main St. Edmonds. WA 98020 771-023 1 AUTHORIZED AGENT OR CONTRACTOR lntenvest Construction AT7ENTION: Pete VanAssche 651 N Hill Blvd. BurlingEon, WA 98233 (360) 661-5423 PROJECT DESCRIPTION- New. Permanent. FiNed, Freshwater '. Above water. Natural (Wood (Milled)), Water Crossing Structure (Bridge (Full Span OHW)), PROJECT LOCATION: fritersection of 7 1h Ave. and Fir St., Snohomish County. Latitude - 47.80141 Longitude - W422.37225 WRIA WATER BODY TRIBUTARY TO 114 SEC. SEC. TOWNSHTF RANGE COUNTY 1 08.0010 SheftcrZerCrwk Putgat Sound NW 25 27 North 03 Ewst Silohonlish P ISIONS I TIMING LIMITATIONS: The project may ginJulyl,2003and allbecompleted LySeptember30,2002. 47 ulftile RA 2. Work shall be accomplished per plans and specifications entitled, Seventh, Avenue and Fir St B D, submitted to the Washington D � artment of Fish and Wildlife. except as modified by this Hydraulic Project Approval. ep 'Mese plans reflect design criteria per Chapter 220-110 WAC. These plans reflect nuitigation procedures to significantly reduce or elimina(d impacts to fish resources. A copy of these plans shall be avaable on site during construction. n .3. Excavatio' for the fbotings shall be completely separated from the stre= by placing the footings landward of the top of the bank. 4, The bridge structure shall be placed in a manner to ininimize darnage to the streambed and banks. 5. The bridge shall be constructedio pass the 100-year peak flow with consideration of debris likely to be encountered. 6. Abumients; . piers, piling, sills, approach Fills. etc., shall not constrict the flow wid cause any appreciable increase (not to excew 0.2 feet) in backwater elevaElon (calculated at the 100-year flood) or channel -wide scour. and shall be aligned 7. Structures containing concrete shall be sufficiently cured prior to contact with water to avoid letiching. Fresh concrete shall nbr be allowed to conic into contact with sm. te waters. 1 8, Approach material shall be structurally smble and shall be composed ofmaterial that if eroded into the water shall not be detrimental to fish lif�. Page I of 4 06/24/2003 TUE 13:23 FAX 360757(f INTERWEST CONSTRUCTION 0 0003/005 HYDRAULIC PROJECT APPROVAL Slate of Washington IT) punpient of Fish and Wildlife a Z= - ( RCW 77.55-100 - appeal pursuant to Chapte�r 34.05 RCW R:gion 4 Office Flwmd 16018 MM Creek lioulmrd w0fa NIB Creek Washington 98012 DATE OF ISSUE: Mav,22. 2003 LOG NUMBER: ST-F225Q-0 I 9. Equipment used for this project shall be Free of external petroleum -based products while working around the strearn. Accumulation of soils or debris 51WI be removed from the drive mechanisms (wheels, tires, tracks. etc.) and undercarriage of equipment prior to its working below the ordinary high water line. Equipment shall be checked daily For leaks and any necessary repairs shall be completed prior to commericingwork activities along the s=m. I 10. All lumber to be used for the project shWl meet or exceed the standards established in "Best Managerricrit practices For the Use of Treated Wood in Aquatic Environments" developed by the Western Wood Preservers Institute, dated July 1996. 11. Erosion control methods shall bel used to prevent silt -laden %%,ater from entering the stream. These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds. check dams of pea gravel -filled burlap bags or offier material, arWor �mnediate mulching of exposed areas. 12. If high flow conditions that may, cause siltation arc encountered during this project.,work shall stop until the now subsides. 13 ), Alteration or disturbance of che bank and bank vegetation shall be limited to that necessary to construct the project. Within seven calender days of projoct completion, a disturbed areas shall be protected from erosion usin vegetation Or other means. Within one year of project completion, the banks, including riprap areas, shall be revegftted with native or other approved woody species. Vegetative cuttings shall be planted at a maximum interval of three feet (on center) and. maintained as necessary for, three Years to ensure 80 percent survival. SEPA: Exempt, no other non --exempt permits APPLICATION ACCEPTED- Max- 13. 2003 ENFORCEMENT OFFICER; Lambert 041 [P3] Eric D. Pentico (425)379-2305 for Director Area Habitat Biologist WDFW GENERAL PROVISIONS This HAratilic Project Approval (1411A) pertains only to the provisions of the Fisheries Code (RCW 77.55 - formerly RCW 73,20). AddiTional authorization from other public agencies may be necessary fbr this project. This HPA shall be available on the job site at all times and all its provisions fbilowW by the permittee and operator(s) performing the work. 'I'llis HPA does not authorize trcspass. 06/24/2003-TUE 13:24 FAX 36075 INTERWEST CONSTRUCTION 121004/005 0 IiYDRAULIC PROJECT APPROVAL stalte or Wulthl F call SAWA- lileparunant of FLA and MUM& Awomwo RCW 77.55-100 - appeal pursuant to Chapter 34.05 RCW Region 4 Offier 16018 MID Creek 8ou1cvvr%1 nwmd Hill Creek WasliIngton 98012 WOLN I)ATEOFISSUE: Mav22.2003 LOG NUMBFR: S.T-F2250-01 Tile person(s) to whom this HPA is issued may be held liable for any loss or damage to fish life or fish habitat which results froin failure to comply with the Provisions of this HPA, Failure to comply with the Provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day or a gross misdemeanor charge, possibly punishable by fine and/or ImprisoninerIt, All HPAs issued pursuant to RCW 77.35. 100 or 77.55.200 are subject to additional restrictions, comfitior[s Or revocation if the Department of Fish and Wildlife determines that new bioloSical or physical information indicates the need for such action, The permittce has the right pursuant to Chapter 34.04 RCW to appeal such decisions. All HPAs issued pursuant to I ufi ns; aft r nsultation ith RCW 77.53.110 maybe modified bv the Department of Fish and Wildlife due to changed col tio e CO w the permittee: PROVIDED HOWEVER, that such modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.170. APPEALS - GENERAL INFORMATION IF YOU WISH TO APPEAL A DENIAL OF OR CONDITIONS PROVIDED N A HYDRAULIC PROJECT APPROVAL, THERE ARE INFORMAL AND FORMAL APPEAL PROCESSES AVAILABLE. A. INFORMAL APPEALS (WAC 1220-11 b-340) OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.35-100: 77.55.110, 77.55-140. 77.55.190, 77.35.2007 and 77.55.290; A person Nvho is aggrieved or adversely affected by the fbilowing Department actions may request an infornial review of (A) The denial or issuance of a HFA, or the conditions or provisions made part of a HPA: or (B) An order imposing civilperialties. it is recommended that an ago�ved partv contact the Area Habitat Biologist and discuss the conce=. Most problems I for an INFORMAL are resolved at this level, but if not, you may elmte your concerns to his/her supervi - A request REVJEW shall be in WRITING, to the Department of Fish and Wildlife, 600 Capitol Way North- OlymPL-L Washington 98501-1091 mid shall be RECEIVED by the Department within 30-days of the denial or issuance of a HPA or receipc I I - of an order Imposing civil peria ties. The 30-day time requirement may be staved bx the Department if =90tiati= am occurring between the aggrieved Party ud theArea 1-labitaE Biologist and/or his/her Supervisor. The Habitat Protection services Division Manager or his/her designee shall conduct a review and recommend a decision to the Director or its designee. If you are not satisfied with the results of this infan-nal appeal. a formal appeal may be filed. B. FORMAL APPEALS (WAC 210-110-330) OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77,55. 100 OR 77.55.140: A person who is aggrieved or adversely affected by the following Department actions may request an forinal review of (A) The denial or issuance of a 4A, or the conditions or provisions made part of a HPA� (B) An order imposing civil, penaltius,. or cdure (C) Any other "agency action" for which an adjudicative, proceeding iq requirud under Elie Administrative Proc Act, Chapter 34.05 RCW. A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife, 600 Capitol Way North. Olympia. Washington 98501-1091, shall be plainly labeled as "REQUEST FOR FORMAL APPEAL" and SIWI b,� RECEIVED DURING OFFICE HOURS by the Department within 30-days of the Department action that is being challenged. The tirne period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal, the deadline for requesting a formal appeal sliall be within 30-days of tile dat(z ofthe Department's written decision in response to the Informal appeal. 06/24/2003 TUE 13:24 FAX 3607571f INTERWEST CONSTRUCTION 0005/005 0 HYDRAULIC PROJECT APPROVAL State of WmItinscon De rintent of ritsh and wjWUrc RCW 77.55.100 - appeal pursuant to Chapter 34.05 RCW pa Region 4 0111ce 16018 MM Creek Boulevard Mill Creck. W.whiagton 98012 DATEOFISSUE' Mav22.200 LOG NUMBER: ST-F2250-01 C, FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO R CW 77.55.110, 77.55.200, 77.55.230, or 77.55.290: A person who is. aggrieved or ad�ersely affected by the denial or issuance of a HPA, or the conditions or provisions made part of a HPA inay request a fonnal appeal. The request for FORMAL APPEAL shall be in WRITING to the Hydraulic Appeals Board per WAC 259-04 aE EnvironmentaI Hearings Office, 4224 Sixth Avenue SE, Building Two - Rowe Six, Lacey, Washington 9�504: telephone '360/459-6327. D. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS RESULTS IN FORFEITURE OF ALL APPEAL RIGHTS. IF THERE : IS NO T1MELY REQUEST FOR AN APPEAL, THE DEPARTMENT ACTION SHALL BE FINAL AND UNAOPEALABLIE. I 20.15B.120 0 turbed condition, measured from prope��;?, hall apply. Based on the definitions within S lines adjacent to residential properties. �EC I DC 20.15B.020, at the time of adoption of 3. Notice of Application for ExemrfW&Y P D:)! ithis.chapter, the city of Edmonds does not con - Upon application for exemption of all or any tain any Class I streams; language regarding portion of a site under the provisions of this these streams is present in order to regulate section, which is equal to or greater than those Class I streams which the city may at 20,000 square feet in area, posting and notice some point incorporate into its jurisdiction. of such application and of staff decision shall A. Required Buffers. Buffers for streams be given in accordance with the provisions of shall be measured on each side of the stream, ECDC 20.95.050(B). Notice shall be provided from the top of the bank. The following are the to all adjacent property owners for sites or por- standard buffers for streams: tions of sites sought for exemption which are 1. Category I streams and Category 2 less then 20,000 square feet in area under the streams with salmonids shall have a 50-foot same procedures. buffer. E. Seismic Hazard Areas. Development 2. Category 2 streams shall have a 25- proposals for sites containing a potential seis- foot buffer. mic hazard area shall only be authorized by 3. Category 3 streams shall have a 10- staff to alter the seismic hazard area when the foot buffer. applicant 00cuments mat: 1. A technical evaluation of the site-'s specific subsurface conditions indicates that the site is not located within a seismic hazard area; or 2. Mitigation is implemented which ren- ders the site of the proposed development as stable within the meaning of the State Building Code and this code. F. Peer Review and Independent Analysis. All applications for development proposals within geologically hazardous areas or seismic hazard areas shall be accompanied by a written site analysis by a geologist or geotechnical engineer licensed by the state of Washington. Peer review, or at the discretion of the staff, an independent review of the technical analysis of site conditions shall be conducted at the appli- cant's expense pursuant to ECDC 20.15B. 140(E). [Ord. 3329 § 1, 2000; Ord. 3087 § 2, 1996]. 20.15B.120 Standards — Streams. No alteration to a stream or buffer shall be permitted unless the city grants an exception pursuant to ECDC 20.15B.040 or unless one of the following applies. In all cases of stream al- teration, crossing, or proposed work within the channel, all city, -state, and federal regulations B. Stream Crossings. For Category I streams, crossings may be allowed only if all reasonable construction techniques and best management practices are used to avoid distur- bance to the stream bed or bank. Upon domple- tion of construction, the area affected shall be restored to an appropriate grade, replanted with native species and/or otherwise protected ac- cording to a plan approved by the planning of- ficial, and maintained and monitored per the requirements of ECDC 20.15B. 150(B). For all categ Dries onstrate that best management practices will be used during construction to provide the follow- ing: 1. Fisheries _vrotection. including no interference with fis *gration or spa * _g; 2. -All crossings hall be' constructed during summer low flow RILnods and shall -be timed to avoid stream disturbance du��ri_ ods when stream use is critical tosalmonids; 3. Crossings shall not occur over salmo- nid spawning areas unless no other possible crossing _s itte exists; 4. Crossings and culverted portions -of the stre theextentfea- siEleand serve multiple purposes and multiple lots whenever possible; (Ftevised 11/00) 20-38 0006.90000 WSS/gjz 4/14/03 RESOLUTION NO. 1042 STREET FILE A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, INITIATING REVIEW OF VACATION OF A PORTION OF 7TH AVENUE SOUTH, SOUTH OF FIR STREET AND SETTING A PU13LIC BEARING. WHEREAS, in response to a petition of property owners, the City Council ordered vacation of the northerly 120 feet of 7h Avenue South, south of Fir Street, and, WHEREAS, only the western one-half of the right of way was ultimately vacated I because of the failure of the property owner adjacent to the east side of the right of way to pay compensation as required by the City Council, and WHEREAS, a request has been made by the planning staff to again consider vacation of the eastern one-half of the previously approved but unconsummated street vacation, now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The City Council hereby imitiates the review and consideration of a request to vacate the easterly half of the northerly 120 feet of 7h Avenue South, south of Fir Street in Edmonds, Washington. By the passage of this resolution, the City Council takes no position regarding the vacation, but rather has initiated the petition pursuant to the requirements of state statute and ECDC 20.70.050. Section 2. Pursuant to the requirements 'of ECDC 20.70.070, the City Council hereby sets a public hearing on the proposed street vacation. The hearing is set for 7:00 PM on fWSS541752.DOC;1/00006.900000/) . - 1 - 0 June 17, 2003, or as soon thereafter as the public may be heard. Said date is not more than sixty days nor less than twenty days after the date of passage of the resolution. RESOLVED this 20th day of May, 2003. APPRO MA/OR, Go�-� HXAKENS�ON�� ATTEST/AUTHENTICATED: '-d' e'6� a oo CITY CLERK, SANDRA S. CHASE FILED WITH THE CITY CLERK:. 05/16/2003 PASSED BY THE CITY COUNCIL 05/20/2003 RESOLUTION NO. 1042 (WSS541752. DOC; 1/00006.900000/) -2- 0 Cf) LLJ RjEcelveo > < APR - 3 2003 PERMIT COUNTER Location of Bridge FIR ST 648 — 704 — Fir Street Fir Street STREET FILE bompt,7-Ep- srrT— 0. Y, Go/ tlo T-Mjcv-s B;Elt f 4 0 u 1-4 a:_- - )a:, i ojp- November'l 8, 1997 Snohomish County P.U.D. No. I P.O. Box 1107 Everett, WA 98201 Dear Customer Service: Ru rr ,�,_ IVED Nov 2 1 '997 �j,JGIINEERING Snohomish County RE: Account # 8419 205715 03 4 Meter # 252945 Name: Sno Co Rd Dist 2 Address: 23800 Firdale Avenue, Edmonds Public Works Robert J. Drewel County Executive 2930 Wetmore Avenue Everett, WA 98201 (425) 388-3488 FAX (425) 388-6494 December 11, 1995, in accordance.with City of Edmonds Ordinance #3054 (see attached), the traffic signal, lighting and related features located in this portion of Snohomish County became the sole responsibility of the City of Edmonds. Please let all billings, accounts and records associated with the electrical at this location reflect the new name and billing address of City of Edmonds -Public Works, 7110 210th Street SW, Edmonds, WA 98206. Mr. Jamal Mahmoud, The City 9f Edmonds Traffic Engineer, has been made aware of the billing changeover (see attached documents). If there are any questions, please feel free to call the Traffic Operations Secretary, Fran Hull, at (425) 388-6420. Sincerely, Randy Firoved TRAFFIC MANAGEMENT SUPERVISOR c:. Peter Hahn, Public. Works Director Jack Bilsborough, P.E., County, Road Engineer James Bloodgood, P.E., Traffic Engineer Alan Gage, P.E.Traffic Signal Operations Engineer Jamal Mahmoud, City of Edmonds Traffic Engineer 4 .1 ' r .. �1! '�� . --ownw— C) 9 0 - 1 9 , . , I .' " .,,I . 1, k .." - " � .'.. . , .1., .. "" , ' - ; �-.. : I -"' - � ­' � , "__1 . 0 City of Edmond n RIGHT-OF-WAY CONSTR?CTION PERMIT A. Address or Vicinity of Constr�ction: B. Type of Work (be specific)" C. Contracton, P A/ o4 . e��40 A1 Mailing Address: '0 / 0) 2) RZE zr?�' State License #: 0"51� 4e4c / -2 / b 14 D. Building Permit # (if applicable): Jf2 4' Contact: Permit Number. V-7- &I Phone: 2 -7 All !�) e.) Liability Insurance: Bond: $ Side Sewer Permit # (if applicable): E. F1 Commercial EJ' Subdivision El City Project E] Utility (PUD, GTE, WNG, CABLE, WATER) n Multi -Family A�ingle Famil E] Other y INSPECTOR: INSPECTOR: F. Pavement or Concrete Cut: EROV�� 0No G. Size of Cut: x H. Chargq�_$ APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application, agrees to hold the City ofEdmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legalproceedings including defense costs, and attorney fees by reason ofgranting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPECTION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH A IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED EORS8,,3UANCE TO THE APPLICANT. Construction drawing of proposed work required with permit applicatio A 24 hour notice is required for inspection; Please call the Engineeriing Di. ion, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes - Street shall be kept clean at all times. Traffic Cantrol and Public Safety shall be in accordance with City regulatipZ9 asre-quired by the City Engineer. All street cut ditches shall be patched with asphalt or City approved matyn"al i h prior,to tl.,e end ofthe working day; ' / .' �z i;�'f - e'. NO EXCEPTIONS. (W11"d - 0­ ./- Ihave read the above ktatements and understand the permit requirements and thepink-copy of-thep�erm^if-evdFbZ- ti t. available on site a ti . mes or inspec i n pWoses. J Signature: Date'� 0-Y X�/ 44, //'J/ rcon,tractororAgerrt) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY L NO WORK SHALL BEGIN PRIOR TO PERMIT -ISSUANCE Fnlrrg. Mv. 1991