710 MAPLE ST.PDFIIIIIIIIIIIIII
12152
710 MAPLE ST
INTER -OFFICE COMMUNICATIONS
DATE
�FOOM'
SUBJECT:
CA14,EV 53WL
wit L C#G"Gg
�Z8 -17el
40 Poor
C�
4 -7
0
c �st�raa,�z
iiZ�, &tom NN -L( CP Ft�
Cn31� SV�A���d�Z� ��nl�
--11117/p
NOR -OFFICE COMMUPOAANS
DATE AUgWt Z, 1974
TO Harry Whitcutt ]EROM pill l;im8
Building OfficiaZ Ngineering
FORM 41 - LITTLE'S
SUBJECT: Lots 30, 29, Mock 90 qity_of Edmonds
The developer of this property has installed a french drain type system
to dry up his Zot; yet in so doing, he has channeled water to the aZZey
and onto private property. This Department has received complaints
from Mrs. Widmer of 7Z0 Maple Street, 77845Z5. Can you assist us in
locating the developer and correcting this problem?
WJN. mjr
CITY OF EDMONDS
Engineering Department
ACTION REPORT
Date: April 2 974 19-42 p.m. Sketch Yes
on back No
Subject: Drainage Problem
Rout in Initial Date
1, Rhonda
2, Bill
3.
4.
5.
6.
7.
Name Mrs: W' Person/Group initiating action
Ad ess 710 Ma 1 Telephone No.
ACTION
1 Drainage problem just occurred in their back yard---SnmP hiiilrlinn__
is going on higher up on the hill Please stop by to --;Pp hPr
this afternnnn_
. .. 7. 1 -. A-V
APPLICATION
for
The City of Edmonds SIDE SEWER PERMIT EASEMENT No ...........................................
NEW CONSTRUCTION ❑ REPAIRS ❑
103-08450
ay OWWidner trNER ........................ ......................................................................... ................................................................................................. PERMIT No. ......................
............. CONTRACTOR .
ADDRESS .............. 719 ... tip ..jg..$treet
. ................................................................ LEGAL DESCRIPTION: LOT No . .............................................. BLOCK No . ............................................
a
•
NAMEOF ADDITION .........................................................................................................................................
DYE TESTED ON SEWER
JULY, 1972
Approved:
DATE........................................ ....... By ....................................................... ..............
a
Z
O
w
U
W.
O
w
CITY OF EDMONDS
COMMUNITY SERVICES DEPARTMENT
RIGHT-OF-WAY CONSTRUCTION PERMIT
A. • Owner: Wastington Natural - Gas ' Company
Name
815 Mercer Street
MailingAddress
t 'C E I V E® Permit No. Z! -� o
AUG 2 7 1991 ' Issue Date
B. • Contractor:
Name*
Mailing Address
Seattle Wash. 84111 � e
City State Zip City State Zip
State License Number Telephone Number
C. • Address or Vicinity of Construction: 710 Maple Street
Type of Work to be Done: Inst. 2" PE Maine in Maple St. from 221W c/1 to 1050East of e/1
of 7 Av. 06. Inst 5/8" PE Service to 710 Maple St. Per Attached Drawing:, 910-036
(-
D. • Work in Connection With: ❑ Sub or Plat ❑ Single Family ❑ City Projects
❑ Commercial. ❑ Multifamily f Utility.
E. • Pavement Cut: ❑ Y ❑ N. F. • Size of. Cut: ( 2) 2 x 4 @ (later • '
APPLICANT TO READ AND SIGN
INDEMNITY: Applicant understands and by his signature to this application, agrees _ to hold , the 'City of Edmonds
harmless from any injuries, damages, or claim's of any kind or description whatsoever, forseen.or unforseen, that may
be made against. the City of Edmonds, or any of its departments or employees,, including or not limited to the defense
of any legal proceedings including defense costs, court, f os ; a'ffd attorriey�feestb'y reispn of granting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR Wi MAN$HT CA�- l) (MATERIALS FOR A PERIOD OF ONE
YEAR FOLLOWING THE FINAL INSPECTION A ACCEPTANCE OF THE WORK.
Estimated restoration fees will be held until the final street patch is completed by City forces, at which time a debit or credit will be
processed for issuance to the applicant.
• A 24 hour notice is required for inspection; Please call Engineering: 771-3202 '
• Work is to be inspected _during progress and at completion.
• Restoration to be in accordance with City Code.. t'
Street to be kept clean at all times. /
• Traffic Control to be in accordance with City regulations.
• All street -cut ditches must be patched with-asphaltor City approved material -prior to end of working day;
NO EXCEPTIONS."
I understand the above and that this permit must be available at the job site for inspection purposes at all times.
Signature: Date: August 19, .991
Owner or Contractor.'
This Permit Must be Posted at the Job Site For Inspection Purposes
Call DIAL -A -DIG Prior to Beginning Work
APPROVED BY: RVV PERMIT FEE: 03o—: /0 6
Time Authorized: VoidA rafter days. Restoration Fee:
Special Conditions: t" Receipt No.:
RELEASED BY:
Fund I11.Fee:
Street Cut Dimensions: X = $
Date � f . INSPECTED BY
NO WORK TO BEGIN PRIOR TO PERMIT ISSUANCE
Date
Eng. Div. March 1989
FIELD INSPECTION NOTES
� f
(Fund I I I - Route copy to Street Dept.)
Comments:
Diagram:
CONTRACTOR CALLED FOR INSPECTION ❑ YES ❑ NO
Partial Work Inspection by P. W.:
Work Disapproved By: Date:
FINAL APPROVAL BY: Date:
Eng. Div. July 1985
PA-�-f 0 0 A
0&-,rlvq (,a,,fo►AeR5 ip
4p6o, 709 MaPLE 5-C
IZ p; - 7 As/
MAPI-e:_
T. 7 1 � s', 11=;,�
V" x
-ZI #4
I
vi,v
-6.
PAS.
f-
- Nxff��
AJO-r
tj . rf oo ej -wij-og-
A4JVP
j
06 Z,.Afe
AEC—
'505
BILL.OF MATERIAL�
LAr
I f
i .I 11.
MAI" EST
T
TO: M AP S
----------
.7
— ---- ----- —
Z, 4r
10 _0