Loading...
711 4TH AVE S.PDF111111111111 5095 7114THAVE S APPLICATION for The City of Edmonds SIDE SEWER PERMIT EASEMENT No.......-.... NEW CONSTRUCTION 0 REPAIRS 0 OWNER...... }-.RX . ................................ ................................ CONTRACTOR .... .............................................................................................. PERMIT No . ...................... ...... ........... LEGAL DESCRIPTION: LOT No .. .............................................. BLOCK No . .............. ADDRESS .... 7.1.1 .... ........ . .... ............................ ............ NAMEQFADDITION ................... .................................................... ............. .................................................. Ir 0 Lu .j LL. Lu W Jun q, q e. Tt-64e- o( 0,4 Approved: DATE................................................ By ....................................................................... i' t fnc. 1g9v City of Edmonds RIGHT-OF-WAY CONSTRUCTION PERMIT Permit Number: 9 Issue Date:-6— it 91 A. Address or Vicinity of Construction: V-J B. Type of Work (be specific): C. Contractor: _ _y IOW" Mailing Address: M&.x 41:yt'�t. g- State License #: P V-12 `:J L D. Building Permit # (if applicable): Contact: E�' 'a Phone: Liability Insurance: Bond: $ Side Sewer Permit # (if applicable): E. ❑ Commercial ❑ Subdivision ❑ City Project ❑ Utility (PUD, GTE, WNG, CABLE, WATER) ❑ Multi -Family 2 SinglleFamily (Other INSPECTOR: L� A!16;)— ,,.�.,,�- INSPECTOR: F_ Pavement or Concrete Cut : [I Yes [2 o G. Size of Cut: x H. Charge $ APPLICANT TO READ AND SIGN INDEMNITY: Applicant understands and by his signature to this application to hold the City of Edmonds harmless from injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds, or any of its departments or employees, including or not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FOLLOWING THE FINAL INSPEC- TION AND ACCEPTANCE OF THE WORK. ESTIMATED RESTORATION FEES WILL BE HELD UNTIL THE FINAL STREET PATCH IS COMPLETED BY CITY FORCES, AT WHICH TIME A DEBIT OR CREDIT WILL BE PROCESSED FOR ISSUANCE TO THE APPLICANT. Two sets of construction drawings of proposed work required with permit application. A 24 hour notice is required for inspection. Please call the Engineering Division, 771-0220. Work and material is to be inspected during progress and at completion. Restoration is to be in accordance with City Codes. Street shall be kept clean at all times. Traffic Control and Public Safety shall be in accordance with City regulations as required by the City Engineer. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the working day; NO EXCEPTIONS. I have read the above statements and understand the permit requirements and the pink copy of the permit will,be available on site at all times for inspection purposes. Signature: Date: J o ii e I `, • 9 -1 (Contractor or ,4gent) CALL DIAL -A -DIG PRIOR TO BEGINNING WORK FOR CITY USE ONLY APPROVED BY: ' zy b't'l 4 TIME AUTHORIZED: VOID AFTER % LA " ') 8 DAYS SPECIAL CONDITIONS: #/1/" ( c 014 1 f # r, 01 Al RIGHT OF WAY FEE: DISRUPTION FEE/FUND 111: RESTORATION FEE: T OTAL FEE: ,�f el"!? RECEIPT NO.: 115 y� ISSUED BY: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Eng. Div 1997 —,. FIELD INSPECTION NOTES Comments Diagram (Fund 111 - Route copy to Street Dept.) CONTRACTOR CALLED FOR INSPECTION ❑ YES Partial Work Inspection by P.W.: Work Disapproved By: Date: FINAL APPROVAL BY: Date: ❑ NO . s JOS v �'scc�l Patrick G. Gipson Construction inspection Service 711 41h Avenue So. Edmonds, WA 98020 (206) 774-8874 The City of Edmonds Water Service Drawing EASEMENTNO . ............................................ NEW CONSTRUCTION F] REPAIRS ' LID NO . .................. ASMT. NO . .................. OWNER ................ CONTRACTOR .................................................................................... PERMIT NO. 174�47Y JOB ADDRESS ......... ...... 5 ...................... LEGAL DESCRIPTION: LOT NO . ...................................... BLOCK NO. .................................... .... ....... .... WAMF OF AT)nT-rTC)N - ................................................................................. MO. --t- - - - I Approved: PWW-0001.11/75 (REV.11/78) ................. By ............... ... .... .................. jl�.... J 110 CITY OF EDMONDS ZONE CONSTRUCTION PERMIT APPLICATION joe nwNFR NAME NAME OF BUSINESS I ADDRESS LING ADDRE55 I i -/i Z/V NAME �_ /j l�Y,g 1 A�RESS CITY STATE LICENSE NUMBER CAffI'l I anal Description of P PERMIT 02- -q NUMBER _/ 9 5a !ECKI SURDIVISION NO. ILID NO. PUBLIC RIGHT OF WAY PER OFFICIAL STREET MAP, EXISTING REQUIRED DEDICATION PROPOSED TESCP Approved ❑ RW Permil Required ❑ Street Use Permit Req'd ❑ Inspection Required ❑ Sidewalk Required ❑ ZIP TELEPHONE NUMBER 4 ,7,7 —SV I� METER SIZE LINE SIZE NO. OF FIXTURES PRV REQUIRED YES 0 NO ❑ E NUMBER u s— ZIP TELEPHONE NUMBER E lye -, EXPIRATION DATE _. . Iv - include all easements Tax Account,,.'} Parcel No �" f...4� 7 / /Jf if �_. NEW �f�Xl1� w& J RESIDENTIAL (PLUMBIN EQIb6 ADDITION COMMERCIAL COMPLANCEOR CHANGE OF USE REMODEL El APT. BLDG. SIGN REPAIR GRADING CYDS. FENCE C� I--x—FT) DEMOLISH WOODSINSERT SWIPOOL HOT HOT TUB SPA CARPORT ROCKERYRETAININWALL/ ❑ RENEWAL (TYPE OF USE. BUSINESS OR ACTIVITY) EXPLAIN: :57, - NUMBER OF STORIES` NUMBER OF DWELLING ;4 UNITS CRITICAL AREAS NUMBER • ' DESCRIBE WORK TO BE DONE (ATTACH PLOT PLAN) A Am VI V 411,V? Of" ENGINEERING MEMO DATED REVIEWED BY SIGN AREA SEPA REVIEW ADS NO. ALLOWED PROPOSED COMPLETE EXEMPT SHORELINE EXP VARIANCE OR CU PLANNING REVIEW BY DATE SETBACKS — FEET HEIGHT LOT COVERAGE FRONT SIDE REAR CHECKED BY TYPE OF CON5THUCIIVN! wut A vuuur %L Jo1��}T .iS �! f,� 7 —GRO .� SPECIAL INSPECTOR AREA TT OCCUPANT REQUIRED LOAD ❑ YES REMARKS PROGRESS INSPECTIONS PER UBC 108 film a! oK %je q-y-97 FINAL INSPECTION REQUIRED k r / � /`',�'t/i PLAN CHECK FEE HEAT SOURCE: GLAZING B/D BUILDING PLUMBING Plan Check No. MECHANICAL This Permit covers work to be done on private property ONLY. GRADINGIFILL Any construction on the public domain (curbs, sidewalks, driveways, marquees, etc.) will require Separate permission. STATE SURCHARGE Permit Application: 180 Days STORM DRAINAGE FEE Permit Limit:1 Year - Provided Work is Started Within 180 Days . "Applicant, on behalf of his or her spouse, heirs, assigns and ENG. INSPECTION FEE tn successors in interest, agrees to indemnify, defend and hold w harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance Issuance of this permit shall not be deemed to PLAN CHECK DEPOSIT of this permit. modify, waive or reduce any requirement of any city ordinance Vf1 = nor limit in any way the City's ability to enforce any ordinance TOTAL AMOUNT DUE provision." I hereby acknowledge that I have read this application; that the ATTENTION APPLICATION APPROVAL Information given is correct; and that I am the owner, or the duly authorized agent of the owner. I agree to comply with city and THIS PERMIT This application is not a permit until state laws regulating construction; and in doing the work authoriz- AUTHORIZES signed by the Building Official or his/her ed thereby, no person will be employed In violation of the Labor ONLY THE WORK NOTED Deputy; and fees are paid, and receipt is Code of the State of Washington relating to Workmen's Compensa- acknowledged in space provided. tion Insurance and RCW 18.27. INSPECTION IGNAT RE (OWNE ) DATE SIGNED (� � _ DEPARTMENT CITY OF SI NATURE AT 0 EDMONDS CALL FOR ELEASED BY: DATE ATTENTION`,, INSPECTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR ��� 0220 ORIGINAL — File YELLOW — Inspector A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC PINK —Owner GOLD —Assessor SECTION 109